Sl No

1
2
3

6
7

10

11

12

13

14

15
1
2

4
5
6
7
8
9
10
11

12

13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
PLOT PLAN (WWT-M20-00000-002-01)
REV 4 UPDATE DETAILS (CURRENT ISSUE)
PIT DIMENSIONS UPDATED AS PER REVISED CIVIL INPUTS .(NEUTRALISTION,PAC DRAIN, POLYMER,RAIN
WATER ,VALVE PITS.

PLOT PLAN (WWT-M20-00000-002-01)


REV 3 UPDATE DETAILS (ISSUED ON 4TH OCT)
Antiscalant skid &pH dosing skid relocated shited towards west to SUIT piping
ROTARY LOBE PUMP SKID LOCATION UPDATED ACCORDING TO AS BUILT COORDINATES
UREA DOSING SKID, PHOSPORIC ACID & NEUTRALIZATION PIT B ALSO SHIFTED SUBSEQUENTLY

PIPE RACK "P" FOOTINGS SHOWN IN REPLACEMENT OF P-Q RACK AT SOUTH SIDE OF CLARIFIER TANK

SUPPORT FOOTINGS SHOWN FOR AERATION TANK MIX TANK A/B & SPLITTER BOX
VALVE PIT AREA AT DNF AREA PROVIDED
PIPE RACK A-C FOOT PRINTS SHIFTED TOWARDS NORTH 500MM AS PER SITE INFORMATION
CARBON CONTACT TANK SIZE UPDATED AS PER CIVIL REVISED DRAWINGS & PIPE RACK FOOT PRINTS EAST
SIDE OF CC TANK AREA ADJUSTED.
FILTER PRESS LOCATION WITH PALTFORM DETAILS UPDATED
citric acid skid tote moved towards east 200mm
AERATION BLOWER SHIFTED RELAVANT TO TANK RECTIFICATION UPDATE
PAC SILO AREA INCLUDING (PAC SILO,PAC VACCUM BLOWER SKID,PAC FILLING HOPPER LAYDOWN AREA RE
ARRANGED AS PER SITE MARKUP
RO SHELTER FOUNDATION DESIGN UPDATED AS PER CIVIL INPUT
NETRALIZATION PIT-D POSITION CHANGED TO SUIT FOUNDATION DESIGN
UF BLOWERS AND UF DRAIN PUMP SKID RE ARRANGED AS PER LATEST SKID DIMENSIONS
PIT PROVIDED FOR SAMPLE CCONNECTION POINT NEAR SOUTH SIDE OF CLARIFIED WATER TANK
PIT PROVIDED FOR SAMPLE CONNECTION POINT AT SEA WATER FILTER OUTLET NEAR AERATION TANK
NORTH SIDE
VALVE PIT PROVIDED FOR NUTRALIZATION PIT B & C (LINES TO AREA RECYCLE PIT)
DNF & DNF DOSING SKIDS AREA AS BUILT COORDINATES RECEIVED &INCORPORATED EXCEPT
FLOCULATION/COAGULATION TANK
UREA AND PHOSPORIC ACID LOCATION CHANGED TO SUIT PIPING
RO FILTER SKID GA UPDATED
CHILLER AND RECIRCULATION SKID GA UPDATED AND POSITION CHANGED TO SUIT PIPING
UF DRAIN/CONCENTRATE PUMP AND BLOWER LOCATION CHANGED TO SUIT PIPING
UF BLOWER LATEST GA UPDATED WITH RECOMMENDED MAINATANCE AREA (INSUFFICIENT)
PAC SILO FOUNDATION AND FOOTINGS TO BE UPDATED
PIPE RACK FOOTPRINTS INCORPORATED
CLARIFIER TANK A COORDINATES UPDATED AS PER ASBUILT CONDITION
SAFETY SHOWER LOCATION INCORPORATED NEAR THE NaOH SUPPLY
NEUTRALISATION PIT NOZZLE DETAILS INCORPORATED
Description
REV - 1 DETAILS
DISCHARGE PUMP SKID ORIENTAION AND POSITION ADJUSTED TO SUIT PIPE ROUTING
SKIDS 43, 44, 49,26,28 ARE REARRANGED TO ACCOMDATE IN COMBINED FOUNDATION
PIT (100) AND PUMP (101) REARRANGED RELATIVELY.
VACUUM BLOWER SKID SHITED TOWARDS EAST AS THE FOUNDATION SIZE OF PAC SILO AND PUMP SKID IS
6000X6000 (INFORMATION BY CIVIL
SKIDS 30, 31 AND 46(In DNF AREA) ARE RELOCATED TO EARLIER POSITON AS SHOWN IN REV A PLOT PLAN AS
PER INFORMATION RECEIVED FROM SITE
FERRIC CHLORIDE SKID SHIFTED TOWARDS EAST TO ARRANGE PCV STATIONS
CARBON CONTACT TANK AREA REARRANGED AS PER SIEMENS PLOT PLAN REV B1 COMMENTS
CIP SKID ORIENTAION AND POSITION CHANGED TO WEST SIDE OF RO REJECT TANK SINCE SIZE OF CIP SKID IS
LONGER THAN EARLIER SIZE SHOWN IN PLOT PLAN
RO REJECT TANK IS SHITED TOWARDS EAST TO ACCOMADATE CIP SKID

WASTE WATER PUMPS AND FILTERS REARRANGED AS PER SIEMENS PLOT PLAN REV B1 COMMENTS

AERATION BLOWERS REARRANGED IN NORTH SOUTH TO SUIT PIPING


UREA SKID AND PHOSPORIC SKIDS RELOCATED TO CLEAR INTERFERENCE WITH PIPE BRIDGE AT ROAD
CROSSING
CITRIC ACID DOSING SKID SHIFTED TOWARDS EAST TO KEEP AWAY FROM HAZORDOUS ZONE ; SODIUM
HYPOCHLORITE DOSING SKID ,TOTES AND UF FILTER PRESS FEED PUMP ARE SHIFTED SUBSEQUENTLY.
NEUTRALIZATION PIT IS LOCATED IN EAST OF CITRIC ACID DOSING SKID
POLYMER DRAIN PIT AT DNF TANK AREA SIZE INCREAED TO 2MX2M. -PROCESS IDC COMMENTS

NEUTRALIZATION PIT PROVIDED FOR RO CIP SKID/ pH ANTISCALANT SKID - PROCESS IDC COMMENTS
REV - B1 DETAILS

FERRIC CHLORIDE SKID AND TOTE POSITION SHIFTED EAST SIDE OF AERATION TANK SPITTER BOX.
RETRUN SLUDGE PUMP SKID UPDATED WITH VENDOR SKID DETAILS
SKID GA UPDATED AS PER VENDOR DETAILS . LIFT STATION PUMP SKID; RETURN SLUDGE PUMP SKIDROTARY
LOBE PUMP SKID;UF SYSTEM PUMP SKID
flocculant tank shited towards east & north
DNF RECYCLE PUMP SKID SHIFTED TOWARDS NORTH& WEST
POLYMER DRAIN PIT (102) SHIFTED TOWARDS NORTH&EAST
COAGULATION DOSING SKID SHIFTED TOWARDS SHOUTH
COAGULATION TOTE SHITED TOWARDS SOUTH
COAGLATION POLUMER TOTE SHIFTED TOWARDS SOUTH
CARBON CONTACT TANK 1&2 OVERFLOW AREA SHOWN
CARBON SETTLING TANK 1&2 POSITION REARRANGED
CARBON CONTACT POLYMERT TOTE POSTION COMBINED WITH CARBON CONTACT POLYEMER METERING
SIKD FOUNDATION
POLYMER DRAIN PIT TAG NO (107) SHIFTED
WASTE WATER FILTER SKID A&B SHIFTED TOWARDS EAST
VACCUM BLOWER SKID UPDATED WITH NEW EQUIPMENT GA
PAC DOSING SKID UPDATED WITH NEW EQUIPMENT GA
RO FEED PUMP SKID AS PER SKID GA CIVLIL DRAING MISMATCH
RO REJECT TANK AS PER CIVIL FOUNDATION DRAWING
RO SKID AS PER CICIL DRAWING
RO FEED TANK AS PER MECHANICAL GA
UF SCONCENTRATE PUMP SKID AS PER SIEMENS GA CIVIL FOUNDATION MIS MATCH
UF DRAIN PUMP SKID AS PER SIEMESNS SKID GA CIVIL FOUNDATION MIS MATCH
UF SYSTEM FEED PUMP SKID AS PER SIEMESNS SKID GA /CIVIL FOUNDATION GA
UF AND UF CONCENTRATE WET WELL AS PER MECHANICAL GA AND CIVIL FOUNDATION
UF BLOWER GA NOT AVAILABLE
CITRIC ACID DOSING SKID AS PER SSIEMENS SKID GA AND CIVIL FOUNDATION GA
FILTER PRESS FEED PUMP SKID AS PER SIEMENS SKID GA CIVIL FOUNDATION GA NOT MATCHING
SODIUM HYPOCHLORITE DOSING AS PER SIEMENS DKID GA AND CIVIL FOUNDATION GA
FILTER PRESS POLYMER METERING SKID AS PER SKID GA
CHILLER UNIT AS PER FOUNDTION GA . SPACE BETWEEN UNITS TO BE CONFIRMED
H3P04 STORAGE & DOSING SKID FOUNDATION AS PER CIVIL GA
UREA WATER SOLUTION STORAGE & DOSING SKID FOUNDATION
BUFFER TANK AS PER CIVIL FOUNDATION AND TANK GA
Uf Filrate Pump Skid AS PER SIEMENS SKID GA
Ferric Chloride Dosing skid foundation - Phase 1 as per civil foundation ga
RAS Pump Skid Foundation as per civil ga
CARBON CONTRACT FEED PUMP AS PER SIEMENS SKID GA AND CIVIL FOUNDATION GA
CARBON CONTACT SLUDGE TRANSFER PUMP SKID FOUNDATION AS PER SKID GA AND CIVIL GA
CC POLYMER DOSING PUMP SKID AS PER SKID GA
Rotary Lobe Pump Skid as per skid ga and civil foundation
Deoiler Vessel Support foundation as per civil ga
11/12/2018

6/25/2018
6/30/2018
7/12/2018

7/16/2018

8/2/2018
8/7/2018
8/20/2018

8/14/2018

9/3/2018
9/4/2018
9/4/2018

9/4/2018

9/25/2018
9/25/2018
9/28/2018
5/22/2018

5/23/2018

5/22/2018

5/24/2018

3/21/2018
3/22/2018
3/22/2018
3/27/2018
4/24/2018
4/24/2018
4/24/2018
4/24/2018
5/8/2018
5/8/2018
date

2/20/2018
2/26/2018
2/26/2018

2/26/2018

2/27/2018

3/8/2018
3/8/2018

3/8/2018

3/8/2018

3/8/2018

3/9/2018

3/9/2018

3/9/2018

3/13/2018

3/13/2018
1/10/2018
1/11/2018

1/16/2018

2/1/2018
2/1/2018
2/1/2018
2/1/2018
2/1/2018
2/1/2018
2/2/2018
2/2/2018

2/2/2018

2/2/2018
2/4/2018
2/4/2018
2/4/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018
2/8/2018