Construction of 10 Storied Teacher's Dormitory Building of Rajshahi University of

Engineering Technology (RUET) at Rajshahi


Engineer's Cost Estimate
Grand Summary
Bill No. Description Amount (BDT)
Bill No. General and Site Facilities
1:
Bill No. Civil Works
2:
A-1 : Sub-structure (Below Ground Level)
A-1.1 : General Sub Soil Investigation Works
A-1.2 Pile Work
A-1.3: Excavation, Filling, Site Development
A-1.4 Brick Soling, Mass Concrete, Polythene Sheet & Water Stopper
A-1.5 Reinforced Cement Concrete (RCC) Works, Admixture & M.S.
Fabrication Works
A-1.6 Brick Work, Paving Brick, Plaster ,Patent Stone
Total (A-1) =
A-2: Super-structure (Above Plinth Level)
A-2.1: Reinforced Cement Concrete (RCC) Works, Admixture & M.S.
Fabrication Works
A-2.2: Brick Works
A-2.3 Cement Plaster and Drip Course
A-2.4: Patent Stone, Tiles, Marble Stone, Granite Stone, ,
A-2.5: Screeding on Roof
A-2.6: Wood Work in Door Frame and Shutter, Clamp, Lock etc.

A-2.7: Stair Railing, Verandah Railing and window Grill works


Total (A-2) =
A-3: Painting, Polishing
A-4 : Aluminium sliding door, sliding window fixed composite window and
glass
Total (A-3 to A-4) =
Total =

Bill No. Plumbing and Sanitary Works


3:
Bill No. Electrical Works (Part-1)
4:
Bill No. Electrical Works (Part-2)
4:
Bill No. Sub-station Equipment, Bus-bar Trunking, H.T. and LT cable works.
5:
Bill No. Diesel Generator and LT cable works.
6:
Bill No. Installation of
7: Lifts:
Bill No. Fire Hydrant System
8:
Bill No. Air-conditioning System
9:
Total (Package) =