KEGIATAN
PEKERJAAN
REVITALISASI PASAR RAKYAT LELES (LANJUT
KABUPATEN GARUT
TAHUN ANGGARAN
2019
AWARAN
UE ZALIKA
(PAJAK ROKOK)
LELES (LANJUTAN)
ARUT
AN
PEMERINTAH KABUPATEN GARUT
DINAS PERINDUSTRIAN, PERDAGANGAN
ENERGI DAN SUMBER DAYA MINERAL
LAPORAN MINGGUAN
KE - 1 (SATU)
(Periode 10 September s/d 14 September 2019)
Kontraktor Pelaksana
PT. RAYNA DOMINIQUE ZALIKA
LAPORAN KEMAJUAN KEGIATAN MINGGU
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 September
REKAPITULASI BOBOT PEKERJAAN
NO URAIAN PEKERJAAN
D PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI BASEMENT / LANTAI DASAR
II PEKERJAAN LANTAI 1
III PEKERJAAN LANTAI 2
IV PEKERJAAN LANTAI DAK BETON
4/307
NO URAIAN PEKERJAAN
JUMLAH BANGU
II BANGUNAN SAMPING
A PEKERJAAN STRUKTUR DAN ATAP
I PEKERJAAN PERSIAPAN
II PEKERJAAN GALIAN TANAH & URUGAN
III PEKERJAAN PONDASI
IV PEKERJAAN BETON LANTAI DASAR
V PEKERJAAN BETON LANTAI 1
VI PEKERJAAN BETON LANTAI 2
VII PEKERJAAN BETON DAK ATAP
VIII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP
B PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI Dasar
II PEKERJAAN LANTAI 1
III PEKERJAAN LANTAI 2
IV PEKERJAAN LANTAI DAK BETON
C PEKERJAAN M-E
I PEKERJAAN LANTAI BASEMENT
II PEKERJAAN LANTAI 1
III PEKERJAAN LANTAI 2
JUMLAH BANGUN
III PEKERJAAN SITE
A PEKERJAAN STRUKTUR DAN ARSITEKTUR
I PEKERJAAN JALAN
II PEKERJAAN PAGAR
III PEKERJAAN SALURAN
B PEKERJAAN M-E
I PEKERJAAN MEKANIKAL & ELEKTRIKAL SITE PLAN
II PEKERJAAN MEKANIKAL & ELEKTRIKAL R. POMPA
III PEKERJAAN MEKANIKAL & ELEKTRIKAL R. PANEL
5/307
NO URAIAN PEKERJAAN
JUMLAH IV
V PEKERJAAN GROUNDTANK & RUMAH POMPA
I PEKERJAAN GROUNDTANK
II PEKERJAAN RUMAH POMPA
JUMLAH V
VI PEKERJAAN RUMAH PANEL
I PEKERJAAN RUMAH PANEL
JUMLAH VI
Diperiksa Oleh,
Konsultan Pengawas
CV. GRIYA LOKA
6/307
N KEGIATAN MINGGUAN
KE : I ( SATU)
r s/d 14 September 2019
BOBOT PEKERJAAN
BOBOT
BOBOT
PEKERJAAN MINGGU S/D
MINGGU INI MINGGU
LALU INI
(%) (%) (%) (%)
- -
- -
0.682 - - -
4.288 - - -
2.588 - - -
3.891 - - -
8.365 - - -
JUMLAH C 19.814 - - -
- -
19.855 - - -
16.166 - - -
2.209 - - -
JUMLAH D 38.229 - - -
- -
7.590 - - -
7/307
BOBOT
BOBOT
PEKERJAAN MINGGU S/D
MINGGU INI
LALU MINGGU INI
(%) (%) (%) (%)
7.254 - - -
1.015 - - -
JUMLAH E 15.858 - - -
JUMLAH BANGUNAN UTAMA 74.418 - 0.034 0.034
- -
- -
- -
0.306 - - -
0.554 - - -
3.413 - - -
0.997 - - -
1.450 - - -
JUMLAH A 6.720 - - -
- -
5.163 - - -
- -
- -
JUMLAH B 5.163 - - -
- -
2.293 - - -
- -
JUMLAH C 2.293 - - -
JUMLAH BANGUNAN SAMPING 14.175 - - -
- -
4.988 - - -
- -
1.776 - - -
JUMLAH A 6.763 - - -
2.037 - - -
0.600 - - -
1.593 - - -
JUMLAH B 4.229 - - -
JUMLAH III 10.993 - - -
8/307
BOBOT
BOBOT
PEKERJAAN MINGGU S/D
MINGGU INI
LALU MINGGU INI
(%) (%) (%) (%)
- -
- - - -
- -
- -
- - - -
0.414 - - -
0.414 - - -
100.000 - 0.034 0.034
-
0.034
0.034
0.027
Cepat) 0.007
Bonaventura, ST
Project Manager
9/307
LAPORAN KEMAJUAN PEKERJAAN MING
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 Septemb
REKAPITULASI BOBOT PEKERJAAN
SUB JUMLAH II
III PEKERJAAN LANTAI 2
PEKERJAAN DINDING, PLESTERAN, ACIAN
1 Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 2,760.36
2 Pekerjaan plesteran dinding 1 : 5 5,520.72
3 Pekerjaan acian dinding sampai setinggi 3 m dr lantai 4,364.40
PEKERJAAN CAT
1 Pekerjaan Pengecatan Dinding Interior + Kolom Beton, sek. Vinilex 4,018.80
2 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 345.60
3 Pekerjaan Pengecatan Plafon gypsum 84.00
4 Pek. Laburan Waterproofing Cementitious Lantai KM/WC, sek. Sika 5.78
PEKERJAAN LANTAI
1 Pek. Keramik Lantai uk. 40x40 2,230.24
2 Pek. Keramik Lantai uk. 20x20 KM/WC 5.78
3 Pek. Keramik Dinding 20x25 KM/WC 39.60
4 Pek. Plin Keramik uk. 10x40 858.00
5 Pek. Keramik Dinding 20x20 Meja Beton sek. Mulia 149.52
6 Pek. Keramik Dinding 20x20 Kios tipe 5 sek. Mulia 171.84
PEKERJAAN PLAFOND
1 Pek. Rangka Plafon Hollow 84.00
2 Pek. Plafon Gypsum t= 9 mm sek. Knauf 84.00
PEKERJAAN KUSEN, PINTU, JENDELA, BV
1 Pek. Pas. Kusen, Pintu & Asesoris tipe P1 1.00
2 Pek. Pas. Kusen, Pintu & Asesoris tipe P2 4.00
3 Pek. Pas. Kusen, Pintu PVC KM.WC 2.00
4 Pek. Pas. Kusen, Kaca & Asesoris tipe J 1 6.00
5 Pek. Pas. Kusen, Kaca & Asesoris tipe J 2 4.00
6 Pek. Pas. Kusen, Kaca & Asesoris tipe J 3 1.00
7 Pek. Pas. Kusen, Kaca & Asesoris tipe BV 3 2.00
PEKERJAAN SANITAIR
1 Pek. Pasang Kloset Jongkok sek. Toto 2.00
2 Pek. Pasang Kran 1/2" sek. Toto 2.00
13/307
NO URAIAN PEKERJAAN VOLUME
SUB JUMLAH IV
JUMLAH B ARSITEKTUR
TOTAL JUMLAH A+B
ERJAAN MINGGUAN
I ( SATU)
d 14 September 2019
OT PEKERJAAN
set 0.004 - - - -
org 0.005 - - - -
0.009 - - -
org 0.004 - - - -
org 0.018 - - - -
org 0.018 - - - -
org 0.036 - - - -
org 0.036 - - - -
org 0.004 - - - -
org 0.005 - - - -
lbr 0.009 - - - -
lbr 0.009 - - - -
lbr 0.009 - - - -
0.146 - - -
m3 0.077 - - - -
m3 0.233 - - - -
m3 0.233 - - - -
m1 0.139 - - - -
0.682 - - -
m3 1.104 - - - -
m3 0.597 - - - -
m3 0.287 - - - -
m3 2.092 - - - -
m1 0.208 - - - -
4.288 - - -
m3 1.264 - - - -
m3 0.751 - - - -
m3 0.365 - - - -
m1 0.208 - - - -
2.588 - - -
m3 0.802 - - - -
m3 0.321 - - - -
m3 1.677 - - - -
m3 0.123 - - - -
m3 0.357 - - - -
m3 0.508 - - - -
m1 0.104 - - - -
3.891 - - -
kg 0.091 - - - -
BOBOT REALISASI KEMAJUAN PEKERJAAN
SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
kg 0.143 - - - -
kg 0.384 - - - -
kg 0.246 - - - -
kg 0.130 - - - -
kg 0.064 - - - -
kg 0.048 - - - -
kg 2.441 - - - -
kg 0.007 - - - -
kg 0.010 - - - -
kg 0.179 - - - -
kg 0.396 - - - -
bh 0.106 - - - -
kg 0.026 - - - -
m3 0.093 - - - -
m2 3.554 - - - -
m' 0.044 - - - -
m2 0.076 - - - -
m1 0.043 - - - -
m1 0.179 - - - -
m1 0.104 - - - -
8.365 - - -
19.814 - - -
m2 4.799 - - - -
m2 3.386 - - - -
m2 2.048 - - - -
m2
m2 5.512 - - - -
m2 0.012 - - - -
m2 0.085 - - - -
m1 0.213 - - - -
m2 0.323 - - - -
m2 0.371 - - - -
m2 1.182 - - - -
m2 0.083 - - - -
m2 0.523 - - - -
m2 0.004 - - - -
unit 0.064 - - - -
unit 0.010 - - - -
17/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
unit 0.603 - - - -
unit 0.247 - - - -
unit 0.034 - - - -
unit 0.010 - - - -
bh 0.018 - - - -
bh 0.004 - - - -
bh 0.003 - - - -
m1 0.082 - - - -
m1 0.149 - - - -
m3 0.092 - - - -
19.855 - - -
m2 3.549 - - - -
m2 2.504 - - - -
m2 1.548 - - - -
m2 0.875 - - - -
m2 0.083 - - - -
m2 0.019 - - - -
m2 0.004 - - - -
m2 5.512 - - - -
m2 0.012 - - - -
m2 0.085 - - - -
m1 0.213 - - - -
m2 0.323 - - - -
m2 0.371 - - - -
m2 0.026 - - - -
m2 0.042 - - - -
unit 0.064 - - - -
unit 0.144 - - - -
unit 0.010 - - - -
unit 0.226 - - - -
unit 0.247 - - - -
unit 0.034 - - - -
unit 0.010 - - - -
bh 0.018 - - - -
bh 0.004 - - - -
BOBOT REALISASI KEMAJUAN PEKERJAAN
SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
bh 0.003 - - - -
m1 0.149 - - - -
m3 0.092 - - - -
16.166 - - -
m2 0.494 - - - -
m2 0.348 - - - -
m2 0.272 - - - -
m2 0.184 - - - -
m2 0.166 - - - -
m3 0.605 - - - -
bh 0.056 - - - -
bh 0.054 - - - -
bh 0.030 - - - -
2.209 - - -
38.229 - - -
58.044 - - -
19/307
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 September 2019
REKAPITULASI BOBOT PEKERJAAN
20/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
3 Pek. Pas. Kusen, Kaca & Asesoris tipe BV 2 1.00 unit 0.009 - - - -
PEKERJAAN LAIN-LAIN
1 Hand Rail Pipa 2" Finish Cat 40.00 m1 0.082 - - - -
2 Pek. Urugan Pasir Urug Bawah Keramik t= 10cm 52.83 m3 0.142 - - - -
21/307
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 September 2019
REKAPITULASI BOBOT PEKERJAAN
I PEKERJAAN JALAN
1.1 Pekerjaan Beton Rigid t= 15 cm, K 250 190.73 m3 2.518 - - - -
1.2 Pekerjaan Lantai Kerja t=5 cm, K 175 63.58 m3 0.510 - - - -
1.3 Pekerjaan Urugan Pasir urug dipadatkan t=10cm 127.16 m3 0.342 - - - -
1.4 Pekerjaan Paving blok Tbl 8 cm 260.00 m2 0.461 - - - -
1.5 Pekerjaan Kanstein Paving Blok 280.00 m1 0.163 - - - -
1.6 Pekerjaan Urugan Pasir Urug Drop Zone Di padatkan 18.00 m3 0.048 - - - -
1.7 Pekerjaan Pasangan Batu Drope Zone 77.00 m3 0.709 - - - -
1.8 Pekerjaan Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 70.00 m2 0.090 - - - -
1.9 Pekerjaan plesteran dinding 1 : 5 140.00 m2 0.063 - - - -
2.0 Pekerjaan plesteran Acian dinding 140.00 m2 0.050 - - - -
2.1 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 140.00 m2 0.033 - - - -
II PEKERJAAN PAGAR
III PEKERJAAN SALURAN
3.1 Pekerjaan Saluran tipe 1 262.54 m1 1.570 - - - -
3.2 Pekerjaan Saluran tipe 2 21.25 m1 0.206 - - - -
22/307
0
SUB JUMLAH I -
SUB JUMLAH II -
III PEKERJAAN PONDASI
1 Pek. Pondasi Batu Belah Menerus camp. 1Pc : 3Psr 1.50 m3 773,000.00 TAHAP BERIKUTNYA
2 Pek. Pondasi Batu Belah Setempat camp. 1Pc : 3Psr 0.38 m3 773,000.00 TAHAP BERIKUTNYA
3 Pek. Urugan Pasir Urug Bawah Pondasi Batu Belah Menerus t=10cm 0.48 m3 226,000.00 TAHAP BERIKUTNYA
4 Pek. Urugan Pasir Urug Bawah Pondasi Batu Belah Setempat t=10cm 0.14 m3 226,000.00 TAHAP BERIKUTNYA
SUB JUMLAH III -
IV PEKERJAAN BETON
1 Pek. Beton Sloof 15/20, K-225 ( tul.144,88 kg/m3besi+bekisting) 0.35 m3 3,850,600.00 TAHAP BERIKUTNYA
2 Pek. Beton Kolom Praktis 15/15, K-225 (tul.181,81 kg/m3besi+bekisting) 0.47 m3 3,541,100.00 TAHAP BERIKUTNYA
3 Pek. Beton Meja t= 10cm 0.09 m3 3,430,000.00 TAHAP BERIKUTNYA
SUB JUMLAH IV -
V PEK. DINDING, PLESTERAN DAN ACIAN
1 Pasangan dinding Bata Merah Kls. 1, 1/2 campr 1 : 5 22.08 m2 108,000.00 TAHAP BERIKUTNYA
2 Pekerjaan plesteran dinding 1 : 5 44.16 m2 38,100.00 TAHAP BERIKUTNYA
3 Pekerjaan acian dinding dan Plafond Expose Beton 56.41 m2 29,800.00 TAHAP BERIKUTNYA
4 Pekerjaan Finishing Opening Pintu/jendela 1 : 5 3.00 m2 28,000.00 TAHAP BERIKUTNYA
SUB JUMLAH VI -
VI PEK. PENUTUP LANTAI DAN DINDING
1 Pek. Pas. Keramik Lantai 40x40 , Ruangan Dalam 4.00 m2 207,600.00 TAHAP BERIKUTNYA
2 Pek. Pas. Keramik Lantai 20x20 , KM/WC 2.56 m2 170,000.00 TAHAP BERIKUTNYA
3 Pek. Pas. Keramik Dinding 20x20, KM/WC 10.60 m2 181,200.00 TAHAP BERIKUTNYA
SUB JUMLAH VII -
VII PEK. KUSEN, DAUN PINTU DAN DAUN JENDELA ALUMUNIUM
1 Pek. Pas. Kusen Pintu PVC (Lkp engsel,kunci dan assr) Unit 419,000.00 TAHAP BERIKUTNYA
2 Pek. Pas. Kusen Type BV1 (Lkp kaca dan assesories) sek. Alexindo 1.00 Unit 1,464,000.00 TAHAP BERIKUTNYA
SUB JUMLAH VIII TAHAP BERIKUTNYA
VIII PEK. PENGECATAN
1 Pekerjaan Pengecatan Dinding Interior + Kolom Beton, sek. Vinilex 67.32 m2 18,300.00 TAHAP BERIKUTNYA
2 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 21.00 m2 20,100.00 TAHAP BERIKUTNYA
3 Pekerjaan Pengecatan Plafon Beton, sek. Vinilex 12.25 m2 19,200.00 TAHAP BERIKUTNYA
4 Pek. Laburan Waterproofing Cementitious Dak Beton, sek. Fosroc 12.25 m2 62,000.00 TAHAP BERIKUTNYA
SUB JUMLAH IX -
IX PEKERJAAN ELEKTRIKAL
1 Lampu LED 13 W (incl. fitting & accesories) 2.00 unit 77,100.00 TAHAP BERIKUTNYA
2 Saklar Ganda 1.00 unit 246,200.00 TAHAP BERIKUTNYA
3 Kotak Kontak 2.00 unit 93,600.00 TAHAP BERIKUTNYA
4 Instalansi Penerangan 2.00 ttk 509,100.00 TAHAP BERIKUTNYA
5 Instalansi Kotak Kontak 2.00 ttk 212,900.00 TAHAP BERIKUTNYA
6 kWh Meter 1 PH (incl. Box MCB & Accesories) 1.00 unit 943,800.00 TAHAP BERIKUTNYA
SUB JUMLAH XI -
JUMLAH IV
IV-Pos Jg Page 23
0
PEKERJAAN : GROUNDTANK
PROYEK : STRUKTUR, ARSITEKTUR
REVITALISASI PASAR LELES KABUPATEN GARUT
JUMLAH I -
JUMLAH II -
TOTAL JUMLAH -
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 September 2019
REKAPITULASI BOBOT PEKERJAAN
25/307
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 September 2019
REKAPITULASI BOBOT PEKERJAAN
PEKERJAAN PANEL
1.9 Panel PP -Basement 1.00 set
PEKERJAAN ELEKTRIKAL
1.15 TL LED 1x10 W (V-SHAPE) 44.00 unit
1.16 TL LED 2x10 W (RM) 33.00 unit
1.17 Lampu LED 13 W (incl. fitting & accesories) 3.00 unit
1.18 Lampu LED 8 W (incl. fitting & accesories) 4.00 unit
1.18 Saklar tunggal 7.00 unit
1.19 Saklar Ganda 10.00 unit
1.20 Saklar 10 gang 2.00 unit
1.21 Kotak Kontak 18.00 unit
1.22 Instalansi Penerangan 84.00 ttk
1.23 Instalansi Kotak Kontak 18.00 ttk
PEKERJAAN PLUMBING
1.24 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 14.00 m
PVC ø 3/4 inc. 10.00 m
PVC (Riser) ø 2 inc. 5.00 m
1.32 Pump Pit Air Kotor include panel, cable & accessories 2.00 unit
Type : Submersible
Capacity : 50 liter/menit
Head : 10 m
1.33 Pump Pit Air Hujan include panel, cable & accessories 4.00 unit
26/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
Type : Submersible
Capacity : 250 liter/menit
Head : 10 m
PEKERJAAN CCTV
1.56 Digital Video Recorder (DVR) 16 Ch. 1.00 unit
1.57 Keyboard Controller 1.00 unit
1.58 TV Monitor 22" LCD 1.00 unit
1.59 Dome Camera Indoor 2.00 ttk
1.60 PTZ Camera 6.00 ttk
1.61 Instalasi CCTV 8.00 ttk
27/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
SUB JUMLAH I
II PEKERJAAN LANTAI 1
PEKERJAAN PANEL
2.1 Panel PP - lantai 2 1.00 unit 0.137 - - - -
2.2 kWh Meter 1 PH (incl. Box MCB & Accesories) 150.00 unit 1.458 - - - -
PEKERJAAN ELEKTRIKAL
2.11 TL LED 1x10 W (V-SHAPE) 147.00 unit 0.273 - - - -
2.12 Lampu LED 13 W (incl. fitting & accesories) 153.00 unit 0.171 - - - -
2.13 Lampu LED 8 W (incl. fitting & accesories) 4.00 unit 0.003 - - - -
2.14 Saklar tunggal 153.00 unit 0.039 - - - -
2.15 Saklar Ganda 10.00 unit 0.003 - - - -
2.16 Kotak Kontak 302.00 unit 0.077 - - - -
2.17 Instalansi Penerangan 304.00 ttk 0.696 - - - -
2.18 Instalansi Kotak Kontak 302.00 ttk 0.869 - - - -
PEKERJAAN PLUMBING
2.19 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 70.00 m 0.022 - - - -
PVC ø 3/4 inc. 85.00 m 0.029 - - - -
PVC ø 1 inc. 75.00 m 0.028 - - - -
PVC ø 1 1/2 inc. 20.00 m 0.009 - - - -
PVC ø 2 inc. 35.00 m 0.019 - - - -
PVC (Riser) ø 2 inc. 5.00 m 0.003 - - - -
28/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
BSP ø 4 inc 5.00 m 0.012 - - - -
BSP (riser) ø 6 inc 5.00 m 0.020 - - - -
PEKERJAAN CCTV
2.43 Dome Camera Indoor 6.00 ttk
2.44 Instalasi CCTV 6.00 ttk
PEKERJAAN ELEKTRIKAL
3.11 TL LED 1x10 W (V-SHAPE) 132.00 unit 0.245 - - - -
3.12 Lampu LED 13 W (incl. fitting & accesories) 143.00 unit 0.160 - - - -
3.13 Lampu LED 8 W (incl. fitting & accesories) 4.00 unit 0.003 - - - -
3.14 Saklar tunggal 140.00 unit 0.035 - - - -
3.15 Saklar Ganda 10.00 unit 0.003 - - - -
3.16 Kotak Kontak 269.00 unit 0.068 - - - -
3.17 Instalansi Penerangan 279.00 ttk 0.638 - - - -
3.18 Instalansi Kotak Kontak 269.00 ttk 0.774 - - - -
PEKERJAAN PLUMBING
3.19 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 70.00 m 0.022 - - - -
PVC ø 3/4 inc. 85.00 m 0.029 - - - -
PVC ø 1 inc. 75.00 m 0.028 - - - -
PVC ø 1 1/2 inc. 20.00 m 0.009 - - - -
29/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
PVC ø 2 inc. 35.00 m 0.019 - - - -
PVC (Riser) ø 2 inc. 5.00 m 0.003 - - - -
30/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
3.39 Rate Of Rise Heat Detector 67.00 bh
3.40 Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 1.00 bh
3.41 Instalasi Fire Alarm 68.00 ttk
3.42 Intalasi Push button, Alarm bell, Indicator lamp & Fighting Tlp. 1.00 ttk
3.43 TB - FA. 10 pairs 1.00 bh
PEKERJAAN CCTV
3.44 Dome Camera Indoor 6.00 ttk
3.45 Instalasi CCTV 6.00 ttk
31/307
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 September 2019
REKAPITULASI BOBOT PEKERJAAN
PEKERJAAN ELEKTRIKAL
1.9 TL LED 1x10 W (V-SHAPE) 28.00 unit
1.10 Lampu LED 13 W (incl. fitting & accesories) 35.00 unit
1.11 Saklar tunggal 35.00 unit
1.12 Saklar Ganda 2.00 unit
1.13 Kotak Kontak 70.00 unit
1.14 Instalansi Penerangan 63.00 ttk
1.15 Instalansi Kotak Kontak 70.00 ttk
32/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
1.22 Branch control valve, terdiri dari 1.00 set
Gate Valve ø 6 inc
Gate Valve ø 1 inc
Flow switch
Sight glass
PEKERJAAN CCTV
1.33 Dome Camera Indoor 3.00 ttk
1.34 Instalasi CCTV 3.00 ttk
SUB JUMLAH I
II PEKERJAAN LANTAI 1
PEKERJAAN PANEL
2.1 Panel PP - lantai 2 (Penunjang) 1.00 unit 0.048 - - - -
2.2 kWh Meter 1 PH (incl. Box MCB & Accesories) 41.00 unit 0.399 - - - -
PEKERJAAN ELEKTRIKAL
2.9 TL LED 1x10 W (V-SHAPE) 33.00 unit 0.061 - - - -
2.10 Lampu LED 13 W (incl. fitting & accesories) 41.00 unit 0.046 - - - -
2.11 Saklar tunggal 41.00 unit 0.010 - - - -
2.12 Saklar Ganda 2.00 unit 0.001 - - - -
2.13 Kotak Kontak 82.00 unit 0.021 - - - -
2.14 Instalansi Penerangan 74.00 ttk 0.169 - - - -
2.15 Instalansi Kotak Kontak 82.00 ttk 0.236 - - - -
PEKERJAAN PLUMBING
2.16 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 10.00 m 0.003 - - - -
PVC ø 3/4 inc. 10.00 m 0.003 - - - -
PVC ø 1 inc. 45.00 m 0.017 - - - -
33/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
BSP ø 1 1/2 inc 1.00 m 0.001 - - - -
BSP ø 2 1/2 inc 20.00 m 0.029 - - - -
BSP (riser) ø 2 1/2 inc 5.00 m 0.007 - - - -
PEKERJAAN CCTV
2.35 Dome Camera Indoor 3.00 ttk
2.36 Instalasi CCTV 3.00 ttk
PEKERJAAN ELEKTRIKAL
1.9 TL LED 1x10 W (V-SHAPE) 28.00 unit
1.10 Lampu LED 13 W (incl. fitting & accesories) 35.00 unit
1.11 Saklar tunggal 35.00 unit
1.12 Saklar Ganda 2.00 unit
1.13 Kotak Kontak 70.00 unit
1.14 Instalansi Penerangan 63.00 ttk
1.15 Instalansi Kotak Kontak 70.00 ttk
34/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
1.17 Fire extinguiser 2.00 set
Capacity : 3 kg
Type : Dry chemical
PEKERJAAN CCTV
1.33 Dome Camera Indoor 3.00 ttk
1.34 Instalasi CCTV 3.00 ttk
35/307
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 September 2019
REKAPITULASI BOBOT PEKERJAAN
PEKERJAAN PLUMBING
1.6 Pompa Deep Well 1.00 unit
Pompa Deep Well include panel, cable & accessories
Type : Submersible
Capacity : 200 liter/menit
Head : 150 m
2.037 - - -
PEKERJAAN ELEKTRIKAL
2.9 TL LED 1x18 W (V-SHAPE) 2.00 unit
2.10 Saklar Ganda 1.00 unit
2.11 Kotak Kontak 4.00 unit
2.12 Instalansi Penerangan 2.00 ttk
2.13 Instalansi Kotak Kontak 4.00 ttk
PEKERJAAN PLUMBING
2.14 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 2 inc. 50.00 m 0.027 - - - -
2.19 Diesel Pump incl. panel, tangki bahan bakar & accessories 1.00 unit
Tipe : Vertical Turbine
Kapasitas : 750 GPM
Total Head : 100 m
2.23 Accessories
Strainer ø 6 inc 2.00 unit
Automatic Air Release valve 1.00 unit
Pressure gauge 3.00 unit
Safety valve 1.00 unit
0.600 - - -
37/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
3.1 Biaya Penyambungan PLN 105.00 kVA 1.153 - - - -
3.2 LVMDP 1.00 set 0.369 - - - -
PEKERJAAN PLUMBING
3.10 Pipa air hujan (PVC class 10 kg/cm2, incl. accessories)
PVC ø 4 inc. 10.00 m 0.012 - - - -
Roof Drain ø 4 inc. 2.00 m 0.005 - - - -
1.593 - - -
4.229 - - -
38/307
TIME SCHEDULE
REVITALISASI PASAR RAKYAT LELES (LANJUTAN)
KABUPATEN GARUT
TAHUN ANGGARAN 2019
September Oktober
NO URAIAN PEKERJAAN Bobot
1 2 3 4 5 6 7
10 - 14 15 - 21 22 - 28 29 - 5 6 - 12 13 - 19 20 - 26
D PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI BASEMENT / LANTAI DASAR 0.00
II PEKERJAAN LANTAI 1 19.85 2.046 3.349 3.349 3.349
III PEKERJAAN LANTAI 2 16.17 1.900 3.529
IV PEKERJAAN LANTAI DAK BETON 2.21 0.111
II BANGUNAN SAMPING
A PEKERJAAN STRUKTUR DAN ATAP
I PEKERJAAN PERSIAPAN 0.00
II PEKERJAAN GALIAN TANAH & URUGAN 0.00
III PEKERJAAN PONDASI 0.00
IV PEKERJAAN BETON LANTAI DASAR 0.31 0.102
V PEKERJAAN BETON LANTAI 1 0.55
VI PEKERJAAN BETON LANTAI 2 3.41
VII PEKERJAAN BETON DAK ATAP 1.00
VIII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP 1.45
B PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI Dasar 0.00
II PEKERJAAN LANTAI 1 5.16
III PEKERJAAN LANTAI 2 0.00
IV PEKERJAAN LANTAI DAK BETON 0.00
C PEKERJAAN M-E
I PEKERJAAN LANTAI BASEMENT 0.00
II PEKERJAAN LANTAI 1 2.29
III PEKERJAAN LANTAI 2 0.00
B PEKERJAAN M-E
I PEKERJAAN MEKANIKAL & ELEKTRIKAL SITE PLAN 2.04
II PEKERJAAN MEKANIKAL & ELEKTRIKAL R. POMPA 0.60
III PEKERJAAN MEKANIKAL & ELEKTRIKAL R. PANEL 1.59
PT. ......................
Diperiksa Oleh,
Konsultan Pengawas
CV. GRIYA LOKA
0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.006
0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017
0.370
1.297
4.183
0.102 0.102
0.139 0.139 0.139 0.139
0.853 0.853 0.853 0.853
0.332 0.332 0.332
0.483 0.483 0.483
RENCANA PEKERJAAN
16.195 12.955 8.233 7.602 4.957 4.391 4.318 4.318 3.652 1.464
48.111 61.066 69.299 76.900 81.857 86.248 90.566 94.885 98.536 100.000
0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034
0.249 0.283 0.318 0.352 0.386 0.421 0.455 0.490 0.524 0.559
Bonaventura, ST
Project Manager
NO URAIAN PEKERJAAN Bobot
1 2
10 11 12 13 14 15 16 17
D PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI BASEMENT / LANTAI DASAR 0.00
II PEKERJAAN LANTAI 1 19.85
PEKERJAAN DINDING, PLESTERAN, ACIAN
1 Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 4.80
2 Pekerjaan plesteran dinding 1 : 5 3.39
3 Pekerjaan acian dinding sampai setinggi 3 m dr lantai 2.05
PEKERJAAN LANTAI
1 Pek. Keramik Lantai uk. 40x40 5.51
2 Pek. Keramik Lantai uk. 20x20 KM/WC 0.01
3 Pek. Keramik Dinding 20x25 KM/WC 0.09
4 Pek. Plin Keramik uk. 10x40 0.21
5 Pek. Keramik Dinding 20x20 Meja Beton sek. Mulia 0.32
6 Pek. Keramik Dinding 20x20 Kios tipe 5 sek. Mulia 0.37
PEKERJAAN CAT
1 Pekerjaan Pengecatan Dinding Interior + Kolom Beton, sek. Vinilex 1.18
2 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 0.08
3 Erection Kolom Baja WF.300.150.6,5.9 R1 0.52
4 Pek. Laburan Waterproofing Cementitious Lantai KM/WC, sek. Sika 0.00
PEKERJAAN KUSEN, PINTU, JENDELA, BV
1 Pek. Pas. Kusen, Pintu & Asesoris tipe P1 0.06
2 Pek. Pas. Kusen, Pintu PVC KM.WC 0.01
3 Pek. Pas. Kusen, Kaca & Asesoris tipe J 1 0.60
4 Pek. Pas. Kusen, Kaca & Asesoris tipe J 2 0.25
5 Pek. Pas. Kusen, Kaca & Asesoris tipe J 3 0.03
6 Pek. Pas. Kusen, Kaca & Asesoris tipe BV 3 0.01
PEKERJAAN SANITAIR
1 Pek. Pasang Kloset Jongkok sek. Toto 0.02
2 Pek. Pasang Kran 1/2" sek. Toto 0.00
3 Pek. Pasang Floor Drain Sts sek. Toto 0.00
PEKERJAAN LAIN-LAIN
1 Hand Rail Pipa 2" Finish Cat 0.08
2 Pek. Railing Besi Hollow + Handrailing Pipa Besi Ø 2" Fin. Cat (Tangga Darurat ) 0.15
3 Pek. Urugan Pasir Urug Bawah Keramik t= 5cm 0.09
II BANGUNAN SAMPING
A PEKERJAAN STRUKTUR DAN ATAP
I PEKERJAAN PERSIAPAN 0.00
II PEKERJAAN GALIAN TANAH & URUGAN 0.00
III PEKERJAAN PONDASI 0.00
IV PEKERJAAN BETON LANTAI DASAR 0.31
2 Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 0.31
V PEKERJAAN BETON LANTAI 1 0.55
1 Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 0.40
10 Pek. Pemasangan Karet Dilatasi 0.04
11 Pek. Beton Plat Tangga + Bordes dan Perbaikan Bekisting existing 0.08
12 Pek. Beton Plat Tangga + Bordes, K-250 dan Perbaikan Bekisting existing 0.03
VI PEKERJAAN BETON LANTAI 2 3.41
1 Pek. Beton Kolom Praktis 15/15, K-175 0.04
2 Cor Beton Kolom Struktur K1 45/45, K-300 dan Perbaikan Bekisting existing 0.79
3 Cor Beton Kolom Struktur K2 35/45, K-300 dan Perbaikan Bekisting existing 0.16
4 Cor Beton Balok Struktur B1a 30/60, K-250 Bekisting existing 0.41
5 Cor Beton Balok Struktur B1b 30/60 , K-250 Bekisting existing 0.30
6 Cor Beton Balok Struktur B1a 30/60 , K-250 Bekisting existing 0.02
7 Cor Beton Balok Struktur B2 25/45, K-250 Bekisting existing 0.18
8 Cor Beton Balok Struktur B3 25/45, K-250 Bekisting existing 0.03
9 Cor Beton Plat Lantai t= 12 cm, K-250 Bekisting existing 1.43
10 Pek Beton Tangga Split Level 0.05
VII PEKERJAAN BETON DAK ATAP 1.00
1 Pek. Beton Balok Struktur B1b 30/60 , K-250 1.00
VIII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP 1.45
1 Pek. Kolom Baja WF 200.100.5.6 0.03
2 Pek. Kuda-kuda Baja WF 200.100.5.6 0.20
3 Pek. Voute WF 200.100.5.6 0.02
4 Pek. Gording CNP 100.50.20.2,3 0.19
5 Pek Besi L 70.70.7 Dudukan Gording 0.01
6 Pek Besi Plat Stifner t = 0,8 mm 0.03
7 Pek. Besi Trekstang Ø 12 mm 0.04
8 Pek. Ikatan Angin Kuda kuda / Besi Ø 12 mm 0.05
9 Pek. Angker Baud + Mur HTB Ø 18 mm 0.02
10 Pek. Base Plat t = 1,8 mm 0.02
11 Pek. Beton Pedestal 40/40 K-250 0.01
12 Pek. Penutup Atap Bitumaen (Ref Produk Onduline) 0.81
13 Pek. Pasang Nok Bitumen ( ref Produk Onduline ) 0.01
B PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI Dasar 0.00
II PEKERJAAN LANTAI 1 5.16
PEKERJAAN DINDING, PLESTERAN, ACIAN
1 Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 1.40
2 Pekerjaan plesteran dinding 1 : 5 0.99
3 Pekerjaan acian dinding sampai setinggi 3 m dr lantai 0.52
PEKERJAAN CAT
1 Pekerjaan Pengecatan Dinding Interior + Kolom Beton, sek. Vinilex 0.23
2 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 0.09
3 Pekerjaan Pengecatan Plafon Beton + Balok Ekspose, sek. Vinilex 0.12
PEKERJAAN LANTAI
1 Pek. Keramik Lantai uk. 40x40 1.31
2 Pek. Plin Keramik uk. 10x40 0.10
PEKERJAAN KUSEN, PINTU, JENDELA, BV
1 Pek. Pas. Kusen & Pintu Allumunium Spanrel tipe P1 0.01
2 Pek. Pas. Kusen, Jendela & Asesoris tipe J1 0.17
3 Pek. Pas. Kusen, Kaca & Asesoris tipe BV 2 0.01
PEKERJAAN LAIN-LAIN
1 Hand Rail Pipa 2" Finish Cat 0.08
2 Pek. Urugan Pasir Urug Bawah Keramik t= 10cm 0.14
C PEKERJAAN M-E
I PEKERJAAN LANTAI BASEMENT 0.00
II PEKERJAAN LANTAI 1 2.29
PEKERJAAN PANEL
2.1 Panel PP - lantai 2 (Penunjang) 0.05
2.2 kWh Meter 1 PH (incl. Box MCB & Accesories) 0.40
PEKERJAAN INSTALASI KABEL FEEDER
2.3 Kabel Feeder dari LVMDP ke :
Panel PP - lantai 2 (Penunjang) NYFGbY 4 x 25 mm2 0.19
2.4 Kabel Feeder dari PP - lantai 2 (Penunjang) ke :
Kios kelompok 1 NYY 4 x 4 mm2 0.01
Kios kelompok 2 NYY 4 x 4 mm2 0.02
PEKERJAAN KABEL TRAY
2.5 Kabel Tray 300 x 50 mm 0.18
2.6 Kabel Tray 150 x 50 mm 0.15
2.7 Kabel Ladder 300 x 100 mm 0.01
2.8 Kabel Ladder 150 x 100 mm 0.01
PEKERJAAN ELEKTRIKAL
2.9 TL LED 1x10 W (V-SHAPE) 0.06
2.10 Lampu LED 13 W (incl. fitting & accesories) 0.05
2.11 Saklar tunggal 0.01
2.12 Saklar Ganda 0.00
2.13 Kotak Kontak 0.02
2.14 Instalansi Penerangan 0.17
2.15 Instalansi Kotak Kontak 0.24
PEKERJAAN PLUMBING
2.16 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 0.00
PVC ø 3/4 inc. 0.00
PVC ø 1 inc. 0.02
2.17 Valve (Class 125 psi) & Accessories
Gate Valve ø 1 inc. 0.00
Gate Valve ø 3/4 inc. 0.02
Water Meteø 3/4 inc. 0.03
2.18 Pipa air kotor (PVC class 10 kg/cm2, incl. accessories)
PVC ø 2 inc. 0.01
PVC ø 3 inc. 0.01
PVC ø 4 inc. 0.02
PVC (Riser) ø 4 inc. 0.01
PEKERJAAN PENCEGAH KEBAKARAN
2.19 Hydrant Box (Indoor) 0.04
Material
Dimensi
House Rack
Fire House
Hydrant Nozzle
Hydrant Valve
Hydrant Valve
Alarm bel
Manual push button, jack telepon
Indicator lamp
2.21 Pipa Hydrant (BSP Sch 40, incl. accessories)
BSP ø 1 1/2 inc 0.00
BSP ø 2 1/2 inc 0.03
BSP (riser) ø 2 1/2 inc 0.01
2.22 Pipa Sprinkler (BSP Sch 40, incl. accessories)
BSP ø 1 inc 0.01
BSP ø 1 1/2 inc 0.00
BSP ø 2 inc 0.01
BSP ø 2 1/2 inc 0.03
BSP (riser) ø 2 1/2 inc 0.01
2.23 Drain Pipa Sprinkler (BSP Sch 40, incl. accessories)
BSP ø 1 inc 0.01
BSP (riser dø 2 inc 0.01
2.24 Valve (Class 20 K) & Accessories
Gate Valve ø 1 inc 0.00
Gate Valve ø 2 1/2 inc 0.00
Pressure Reø 2 1/2 inc 0.14
Flow switch 0.00
Head sprinkler (pendent type) 0.03
2.25 Branch control valve, terdiri dari
Gate Valve ø 6 inc 0.21
Gate Valve ø 1 inc
Flow switch
Sight glass
PEKERJAAN FIRE ALARM
2.30 Rate Of Rise Heat Detector 0.02
2.31 Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 0.01
2.32 Instalasi Fire Alarm 0.04
2.33 Intalasi Push button, Alarm bell, Indicator lamp & Fighting Tlp. 0.00
2.34 TB - FA. 10 pairs 0.01
B PEKERJAAN M-E
I PEKERJAAN MEKANIKAL & ELEKTRIKAL SITE PLAN 2.04
PEKERJAAN PANEL & TRANSFORMATOR
1.1 Transformator kapasitas 100 kVA Oil Type 0.55
1.2 PP - OD 0.06
PEKERJAAN INSTALASI KABEL FEEDER
1.3 Kabel Feeder dari LVMDP ke :
Panel PP - OD NYFGbY 4 x 4 mm2 0.01
PEKERJAAN PLUMBING
1.7 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 2 inc. 0.05
PVC (Riser) ø 2 inc. 0.01
1.8 Pipa air kotor (PVC class 10 kg/cm2, incl. accessories)
PVC ø 4 inc. 0.05
PVC ø 6 inc. 0.33
1.9 Bak kontrol 0.03
1.10 Biofil BF-08 0.21
1.11 Resapan 0.26
1.15 Hydrant Pipe (BSP Sch.40, incl. accessories)
BSP ø 4 inc 0.12
BSP ø 6 inc 0.20
1.16 Valve Class 20 kg
Gate Valve ø 4 inc 0.05
Check Valveø 4 inc 0.10
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137
0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097
0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059
0.002 0.002 0.002 0.002 0.018 0.002 0.002 0.002 0.002 0.002 0.002 0.311 0.294 0.294 0.294 0.294 0.294 0.294 0.742 0.725 0.725 0.849
0.049 0.051 0.053 0.055 0.073 0.075 0.077 0.079 0.081 0.082 0.084 0.395 0.689 0.983 1.277 1.572 1.866 2.160 2.902 3.627 4.353 5.201
0.029
TIME SCHEDUL
TAHUN ANGGARAN
Oktober
6 7 8
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204
0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053
0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028
0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123
0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060
0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036
0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185
0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038
0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015
0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017
0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.598 0.598 0.598 0.598 0.598 0.598 0.598 0.598 0.598 0.598 0.598 0.598
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.174 0.174 0.174 0.174 0.174 0.174 0.174 0.174 0.174 0.174 0.174 0.174
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.254 0.254 0.254 0.254 0.254 0.254 0.254 0.254 0.254 0.254 0.254 0.254
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478
0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137
0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097
0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059
0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011
0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504
0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127
0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089
0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055
0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.111 0.111 0.111 0.111 0.111 0.111
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.849 0.849 0.849 1.322 1.305 1.305 1.305 1.305 1.305 1.305 2.167 2.150 2.150 2.150 2.150 2.150 2.262 2.332 2.316 2.316 2.193 2.193
6.050 6.899 7.747 9.069 10.375 11.680 12.985 14.291 15.596 16.902 19.068 21.219 23.369 25.519 27.669 29.820 32.081 34.414 36.729 39.045 41.238 43.431
GGARAN 2019
TAHUN 2019
November
9 10 11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.185 0.185
0.038 0.038
0.015 0.015
0.080 0.080
0.006 0.006
0.017 0.017
0.024 0.024
0.005 0.005
0.598 0.598
0.007 0.007
0.010 0.010
0.027 0.027
0.018 0.018
0.009 0.009
0.005 0.005
0.003 0.003
0.174 0.174
0.000 0.000
0.001 0.001
0.013 0.013
0.028 0.028
0.008 0.008
0.002 0.002
0.007 0.007
0.254 0.254
0.003 0.003
0.005 0.005
0.003 0.003
0.013 0.013
0.007 0.007
0.478 0.478 0.511 0.511 0.511 0.511 0.511 0.511 0.511 0.074 0.074 0.074 0.074 0.074 0.177 0.177 0.108 0.000 0.000 0.000 0.000 0.000
0.137 0.137
0.097 0.097
0.059 0.059
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.233 0.233 0.233 0.233 0.233 0.233 0.233 0.273 0.273 0.273 0.273 0.273 0.076
0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.002 0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003 0.003
0.111 0.111 0.111 0.111 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017
0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029
0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030
0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023
0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
2.452 2.452 1.816 1.799 1.833 1.833 1.833 1.833 1.833 1.167 1.151 1.151 1.151 1.151 1.144 1.144 1.131 1.008 1.137 1.137 1.137 0.940
45.882 48.334 50.150 51.949 53.782 55.616 57.449 59.283 61.116 62.284 63.435 64.586 65.737 66.888 68.032 69.176 70.308 71.315 72.452 73.589 74.725 75.665
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.271
0.005
0.052
0.008
0.002
0.001
0.001
0.002
0.001
0.029
0.024
0.000
0.000
0.010
0.006
0.000
0.001
0.000
0.003
0.025
0.031
0.001
0.001
0.001
0.000
0.001
0.000
0.000
0.002
0.004
0.001
0.004
0.003
0.001
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.003
0.000
0.001
0.004
0.000
0.002
0.003
0.003
0.002
0.003
0.001
0.001
0.000
0.000
0.000
0.000
0.014
0.000
0.004
0.007
0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.020
0.014
0.001
0.003
0.001
0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047
0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047
0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129
0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035
0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131
0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057
0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046
0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.008
0.000
0.000
0.000
0.000
0.001
0.000
0.000
0.000
0.000
0.000
0.000
0.001
0.000
0.000
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0.000
0.940 0.763 0.747 0.747 0.747 0.747 0.488 0.488 0.721 0.705 0.668 0.668 0.668 0.668 0.668 0.587 0.571 0.571 0.571 0.571 0.571 0.571
76.606 77.369 78.115 78.862 79.609 80.356 80.843 81.331 82.052 82.757 83.425 84.093 84.762 85.430 86.099 86.686 87.257 87.828 88.398 88.969 89.540 90.111
Garut, 13 Sep
Dibuat
PT. RAYNA DOM
ENI GINARS
Dire
Desember Januari
15 16 17 18
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129
0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035
0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131
0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057
0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041
0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046
0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.587 0.571 0.571 0.571 0.571 0.571 0.571 0.471 0.454 0.454 0.440 0.440 0.440 0.440 0.327 0.311 0.311 0.311 0.311 0.311 0.311 0.192
90.698 91.269 91.840 92.411 92.982 93.553 94.124 94.594 95.049 95.503 95.943 96.383 96.823 97.263 97.590 97.901 98.212 98.523 98.834 99.145 99.456 99.648
t, 13 September 2019
Dibuat oleh,
NA DOMINIQUE ZALIKA
GINARSIH ERMAYA
Direktur
Januari
6 7
0.002 0.002
0.000 0.000
0.000 0.000
0.001 0.001
0.131 0.131
0.066 0.066
0.013 0.013
0.009 0.009
0.012 0.012
0.004 0.004
0.001 0.001
0.019 0.019
0.002 0.002
0.002 0.002
0.001 0.001
0.001 0.001
0.043 0.043
0.002 0.002
0.041 0.041
0.176 0.176
99.824 100.00
106
RINGKASAN HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN PASAR LELES KAB. GARUT
TAHUN 2019
A PEKERJAAN PERSIAPAN
1 1 m1 Pek. pengukuran dan pemasangan Bowplank 46,000.00
2 Pek. Bongkaran Bangunan Eksisting termasuk Buangan Brangkal 80,000,000.00
3 Pek. Dewatering 75,000,000.00
4 Mobilisasi & Demobilisasi 25,000,000.00
5 Pembersihan Lahan 10,580,400.00
C PEKERJAAN PONDASI
1 Memasang 1m3 pondasi batu belah,campuran 1PC : 3PP 773,000.00
E PEKERJAAN BEKISTING
1 Memasang 1 m2 Bekisting Pondasi 60,500.00
2 Memasang 1m2 Bekisting untuk Sloof/Tie beam 2X pakai 67,500.00
3 Memasang 1m2 Bekisting untuk Kolom 2X pakai 151,200.00
4 Memasang 1m2 bekisting untuk balok 2X pakai 138,750.00
5 Memasang 1m2 bekisting untuk plat lantai 2X pakai 165,800.00
6 Memasang 1m2 bekisting untuk tangga 158,850.00
F PEKERJAAN BETON
1 Membuat 1 m3 beton bertulang Pondasi Strauss Pile Ø 50 cm (tuL.83,62 kg/m3 besi + bekisting) 2,258,000.00
2 Membuat 1 m3 beton bertulang Pur Beton P1 250x250x75 cm (tuL.27,38 kg/m3 besi + bekisting) 2,011,000.00
3 Membuat 1 m3 beton bertulang Pur Beton P2 250x250x75 cm (tuL.27,38 kg/m3 besi + bekisting) 2,232,000.00
4 Membuat 1 m3 beton bertulang Pur Beton P3 250x100x75 cm (tuL.245,53 kg/m3 besi + bekisting) 4,495,000.00
5 Membuat 1 m3 beton bertulang Pur Beton P4 120x120x25 cm (tuL.160,82 kg/m3 besi + bekisting) 3,215,100.00
6 Membuat 1 m3 beton bertulang Pedestal 40x25x40 cm (tuL.88,06 kg/m3 besi + bekisting) 2,669,000.00
7 Membuat 1 m3 beton bertulang Sloof 15/20 (tuL.144,88 kg/m3 besi + bekisting) 3,587,000.00
8 Membuat 1 m3 beton bertulang Tie Beam TB1 30/60 (tuL.162,84 kg/m3 besi + bekisting) 3,159,100.00
9 Membuat 1 m3 beton bertulang Tie Beam TB2 25/45 (tuL.233,44 kg/m3 besi + bekisting) 4,101,000.00
11 Membuat 1 m3 beton bertulang Kolom Praktis 15/15 (tuL.261,093 kg/m3 besi + bekisting) 3,541,100.00
12 Membuat 1 m3 beton bertulang Kolom K1 45/45 (tuL.217,35 kg/m3 besi + bekisting) 4,329,200.00
13 Membuat 1 m3 beton bertulang Kolom K2 35/45 (tuL. 266,19 kg/m3 besi + bekisting) 2,604,000.00
14 Membuat 1 m3 beton bertulang Kolom K3 35/45 (tuL. 266,19 kg/m3 besi + bekisting) 5,426,000.00
15 Membuat 1 m3 beton bertulang Kolom Bulat Ø 45 cm (tuL.161,39 kg/m3 besi + bekisting) 5,067,800.00
16 Membuat 1 m3 beton bertulang Ring Balok 15/20 (tuL.144,88 kg/m3 besi + bekisting) 3,850,600.00
17 Membuat 1 m3 beton bertulang Balok Struktur B1a 30/60 (tul.105,46 kg/m3 besi + bekisting) 2,264,000.00
18 Membuat 1 m3 beton bertulang Balok Struktur B1b 30/60 (tul.171,11 kg/m3 besi + bekisting) 2,264,000.00
19 Membuat 1 m3 beton bertulang Balok Struktur B1c 30/60 (tul.105,46 kg/m3 besi + bekisting) 3,153,100.00
19 Membuat 1 m3 beton bertulang Balok Struktur B2 25/45 (tul.220,3 kg/m3 besi + bekisting) 2,525,600.00
20 Membuat 1 m3 beton bertulang Balok Struktur B3 25/45 (tul.206,27 kg/m3 besi + bekisting) 2,525,600.00
21 Membuat 1 m3 beton bertulang Balok Struktur B4 45/60 (tul.156,67 kg/m3 besi + bekisting) 3,850,700.00
22 Membuat 1 m3 beton bertulang Balok 15/60 (tuL.144,88 kg/m3 besi + bekisting) 4,107,000.00
23 Membuat 1 m3 beton bertulang Plat tangga (tu.184,06 kg besi + bekisting) 2,788,300.00
24 Membuat 1 m3 beton bertulang Plat Lantai Basement t= 15 cm (tul. 140,39 kg/m3 besi + bekisting) 3,144,700.00
25 Membuat 1 m3 beton bertulang Plat Lantai t= 12-15 cm (tul. 140,39 kg/m3 besi + bekisting) 2,494,000.00
26 Membuat 1 m3 beton bertulang Plat Atap / Dak t= 10-12 cm (tul. 79,68 kg/m3 besi + bekisting) 3,362,800.00
J PEKERJAAN PLAFOND
1 Memasang 1 m2 Pasangan rangka langit - langit (60 X 60) cm besi hollow 26,000.00
2 Memasang 1 m2 Langit-langit GRC t = 4 mm 33,800.00
3 Memasang 1 m2 Langit-langit Gypsumboard 9 mm 41,700.00
4 Memasang 1 m' list plafond gypsum profil 31,000.00
5 Memasang 1 m' list plafond kayu profil 7,200.00
N PEKERJAAN KACA
1 Memasang 1 M2 pasang kaca polos , tebal 3 mm 123,000.00
2 Memasang 1 M2 pasang kaca Ryben , tebal 5 mm 123,000.00
O PEKERJAAN SANITAIR
1 Memasang I buah kloset jongkok sek Toto 761,475.00
2 Memasang I bh kran Ø 3/4" atau 1/2" Toto T23B13 152,000.00
3 Memasang I bh Floor drain STS Toto TX1BN 113,600.00
Dibulatkan
5 Mengurug 1 m3 pasir urug
Bahan Pasir Urug OH 1.2000
Tenaga Kerja Pekerja OH 0.3000
Mandor OH 0.0100
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
6 Mengurug 1m3 Urugan tanah kembali
Tenaga Pekerja OH 0.1920
Mandor OH 0.0190
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
7 Pembuangan Tanah
Tenaga Pekerja OH 0.5160
Mandor OH 0.0500
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 Membuat 1 m3 beton K 175
Bahan Portland Cement Kg 210.0000
Pasir Beton m3 0.3000
KR maks. 30 mm m3 0.5000
Air Liter 215.0000
Pekerja OH 1.6500
Tenaga kerja Tukang OH 0.2750
Kepala tukang OH 0.0280
Mandor OH 0.0830
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
3 Membuat 1 m3 Cor Beton Ready Mix K 250
Beton Ready Mix K.250 m3 1.0000
Alat bantu m3 1.0000
1 LS
Tenaga kerja
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 Membuat 1 m3 Cor Beton Ready Mix K 300
Beton Ready Mix K.300 m3 1.0000
Alat bantu m3 1.0000
1 LS
Tenaga kerja
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5 Pembesian 1 kg dengan besi atau besi ulir
Bahan Besi beton( ulir ) Kg 1.0500
kawat beton Kg 0.0150
Tenaga kerja pekerja OH 0.0070
Tukang OH 0.0070
Kepala tukang OH 0.0070
Mandor OH 0.0003
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
6 Pembesian 1 kg dengan besi atau besi polos
Pekerja OH 0.5200
Tenaga kerja Tukang OH 0.2600
Kepala tukang OH 0.0260
Mandor OH 0.0260
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
Mandor OH 0.0330
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 Memasang 1m2 bekisting untuk balok 2X pakai
Bahan Kayu kelas lll m3 0.0340
Paku 5 cm-12cm kg 0.4000
Balok kayu kelas lII m3 0.0100
Plywood Tebal 9mm Lbr 0.3500
Perancah kayu kelas lII m3 0.0560
Tenaga kerja Pekerja OH 0.6600
Tukang OH 0.3300
Kepala tukang OH 0.0330
Mandor OH 0.0330
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5 Memasang 1m2 bekisting untuk plat lantai 2X pakai
Bahan Kayu kelas lll m3 0.0400
Paku 5 cm-12cm kg 0.4000
Balok kayu kelas llI m3 0.0150
Multipleks Tebal 9mm Lbr 0.3500
Perancah kayu kelas lII m3 0.0840
Tenaga kerja Pekerja OH 0.6600
Tukang OH 0.3300
Kepala tukang OH 0.0330
Mandor OH 0.0330
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
6 Memasang 1m2 bekisting untuk tangga
Kayu kelas lll m3 0.0300
Paku 5 cm-12cm kg 0.4000
Balok kayu kelas ll m3 0.0150
Multipleks Tebal 9mm Lbr 0.3500
Perancah kayu kelas lII m3 0.0840
Pekerja OH 0.6600
Tenaga kerja Tukang OH 0.3300
Kepala tukang OH 0.0330
Mandor OH 0.0330
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
Dibulatkan
15 Membuat 1 m3 beton bertulang Kolom Bulat Ø 45 cm (tuL.161,39 kg/m3 besi + bekisting)
Beton Mutu K-300 m3 1.0000
Besi Beton 16D16mm kg 124.8800
Besi Beton Cincin D13mm-(100)mm kg 92.4700
Bekisting kolom m2 9.7800
Jumlah
Dibulatkan
16 Membuat 1 m3 beton bertulang Ring Balok 15/20 (tuL.144,88 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 4 Ø10mm kg 82.5684
Besi Beton Cincin Ø8mm-(150 s/d 200)mm kg 62.2216
Bekisting Balok m2 9.3240
Jumlah
Dibulatkan
17 Membuat 1 m3 beton bertulang Balok Struktur B1a 30/60 (tul.105,46 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 12D16mm kg 48.3480
Besi Beton 2D16mm kg 17.5380
Besi Beton Cincin D13mm-(125-250 )mm kg 15.6780
Bekisting Balok m2 8.3250
Jumlah
Dibulatkan
18 Membuat 1 m3 beton bertulang Balok Struktur B1b 30/60 (tul.171,11 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 11D16mm kg 96.4590
Besi Beton 4D16mm kg 35.0760
Besi Beton Cincin D13mm-(125-250 )mm kg 15.6780
Bekisting Balok m2 8.3250
Jumlah
Dibulatkan
19 Membuat 1 m3 beton bertulang Balok Struktur B1c 30/60 (tul.105,46 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 12D16mm kg 48.3480
Besi Beton 2D16mm kg 17.5380
Besi Beton Cincin D13mm-(125-250 )mm kg 15.6780
Bekisting Balok m2 8.3250
Jumlah
Dibulatkan
20 Membuat 1 m3 beton bertulang Balok Struktur B2 25/45 (tul.220,3 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 11D16mm kg 126.7400
kg
Besi Beton Cincin Ø10mm-(100 s/d 150)mm kg 79.5000
Bekisting Balok m2 10.2100
Jumlah
Dibulatkan
21 Membuat 1 m3 beton bertulang Balok Struktur B3 25/45 (tul.206,27 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 11D16mm kg 154.3344
kg
Besi Beton Cincin Ø10mm-(100 s/d 150)mm kg 51.0540
Bekisting Balok m2 10.2100
Jumlah
Dibulatkan
22 Membuat 1 m3 beton bertulang Balok Struktur B4 45/60 (tul.156,67 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 15D16mm kg 87.6900
Besi Beton 6D16mm kg 35.0760
Besi Beton Cincin Ø10mm-(100 s/d 150)mm kg 51.0540
Bekisting Balok m2 6.1050
Jumlah
Dibulatkan
23 Membuat 1 m3 beton bertulang Balok 15/60 (tuL.144,88 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 4 Ø10mm kg 82.5684
Besi Beton 2 Ø13 mm kg 11.5741
Besi Beton Cincin Ø8mm-(150 s/d 200)mm kg 62.2216
Bekisting Balok m2 9.3240
Jumlah
Dibulatkan
24 Membuat 1 m3 beton bertulang Plat tangga (tu.184,06 kg besi + bekisting)
Beton Mutu K-250 m3 1.0000
Besi Beton Bawah Melintang Ø12MM-150 mm kg 66.8750
Besi Beton Bawah Memanjang Ø12MM-150 mm kg 59.0184
Besi Beton Atas Melintang Ø10MM-150 mm kg 46.2500
Besi Beton Atas Memanjang Ø10MM-150 mm kg 6.3825
Besi Beton Step melintang Ø8MM-150 mm kg 1.5800
Besi Beton Step memanjang Ø8MM-150 mm kg 3.9500
Bekisting Step Tangga m2 8.3333
Bekisting Plat Tangga m2 10.0000
Jumlah
Dibulatkan
25 Membuat 1 m3 beton bertulang Plat Lantai Basement t= 15 cm (tul. 140,39 kg/m3 besi + bekisting)
Beton Mutu K-250 m3 1.0000
Besi Beton Tul.melintang 2x Ø 10 mm-100 mm kg 82.5840
Besi Beton Tul.memanjang 2x Ø10 mm-150 mm kg 57.8090
Bekisting Lantai m2 8.3555
Jumlah
Dibulatkan
26 Membuat 1 m3 beton bertulang Plat Lantai t= 12-15 cm (tul. 140,39 kg/m3 besi + bekisting)
Beton Mutu K-250 m3 1.0000
Besi Beton Tul.melintang 2x Ø 10 mm-100 mm kg 82.5840
Besi Beton Tul.memanjang 2x Ø10 mm-150 mm kg 57.8090
Pekerja OH 0.0040
Tukang las konstruksi OH 0.0020
Tenaga Kerja
Kepala Tukang OH 0.0002
Mandor OH 0.0002
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
3 Memasang 1 kg besi profil L/C/Lip Channel/Pipa Besi
Besi profil Kg 1.1500
Bahan
Kawat las listrik kg 0.0400
Pekerja OH 0.0400
Tukang las konstruksi OH 0.0400
Tenaga Kerja
Kepala Tukang OH 0.0040
Mandor OH 0.0020
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 Memasang 1 bh Angker Baud
Angker Baud Bh 1.0000
Bahan
Kawat las listrik kg 0.0400
Pekerja OH 0.0400
Tukang las konstruksi OH 0.0400
Tenaga Kerja
Kepala Tukang OH 0.0040
Mandor OH 0.0020
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5 Memasang 1 kg rangka kuda-kuda baja IWF
Besi baja IWF Kg 1.1500
Bahan
Kawat las listrik kg 0.0400
Pekerja OH 0.0400
Tenaga Kerja Tukang las konstruksi OH 0.0400
Kepala Tukang OH 0.0040
Mandor OH 0.0020
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5a Erection 1 kg rangka kuda-kuda baja IWF
Besi baja IWF Kg 1.1500
Bahan
Kawat las listrik kg 0.0400
Pekerja OH 0.0200
Tenaga Kerja Tukang las konstruksi OH 0.0200
Kepala Tukang OH 0.0020
Mandor OH 0.0010
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
6 Memasang 1 kg Besi Beton Polos Ikat Angin/Trekstang
Bahan Besi Beton Polos Kg 1.1500
Kawat las listrik kg 0.0400
Pekerja OH 0.0600
Tukang las konstruksi OH 0.0600
Tenaga Kerja
Kepala Tukang OH 0.0060
Mandor OH 0.0030
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
7 Memasang 1 m2 Floordeck t= 0,75 mm
Bahan Plat Floordeck t= 0,75 mm Kg 1.0100
Kawat las listrik kg 0.0400
Pekerja OH 0.0600
Tukang las konstruksi OH 0.0600
Tenaga Kerja
Kepala Tukang OH 0.0060
Mandor OH 0.0030
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
8 Memasang 1 m2 pintu Rolling door
Bahan Pintu Rolling Door Plat Besi M2 1.0000
Pekerja OH 1.2000
Tenaga Kerja Tukang las biasa OH 1.2000
Kepala Tukang OH 0.1200
Mandor OH 0.0060
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
9 Memasang 1 m2 pintu Sliding Gate / Folding Gate besi
Bahan Pintu Sliding Gate / Folding Gate Besi M2 1.0000
Pekerja OH 1.2000
Tenaga Kerja Tukang las biasa OH 1.2000
Kepala Tukang OH 0.1200
Mandor OH 0.0060
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
10 Memasang 1 m' Railing Tangga Besi Pipa 2" Finish Cat
Besi Pipa 2" kg 2.7200
Jumlah
Dibulatkan
10 Memasang 1 m' Pipa 6" Finish Cat
Besi Pipa 6" m' 1.1000
Bahan
Asesoris ls 1.0000
Finishing Cat Besi m2 0.0500
Upah Pasang Pabrikasi Ls 1.0000
Tenaga Kerja
Jumlah
Dibulatkan
11 Memasang 1 m2 Alumunium Composite sek. Seven
Alumunium Composite cm 1.1000
Besi hollow 20x60x1,4 mm kg 2.0800
Bahan
Besi hollow 20x40x1,4 mm Kg 3.5700
Asesoris 35% dr bahan ls 1.0000
Upah Pasang Ls 1.0000
Tenaga Kerja
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
12 Memasang 1 bh Huruf Tiga Dimensi
Huruf Plat Eisser t=0,8mm uk. 40x20x4 cm cm 80.0000
Cat Duco m2 0.6400
Bahan
Besi hollow 20x60x1,4 mm kg 2.0800
Besi hollow 20x40x1,4 mm Kg 3.5700
Upah Pasang Ls 1.0000
Tenaga Kerja
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
Memasang 1 bh Huruf Tiga Dimensi T 180 cm
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
15 Memasang 1 m2 Cnc Plat Besi t = 2 mm Finish Cat
Plat Besi Tbl 2 mm m2 1.0100
Asesoris ls 1.0000
Finishing Cat Besi m2 1.1000
Upah Ls 1.0000
Tenaga Kerja
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
Dibulatkan
3 Membuat 1 unit Kusen & Pintu Besi tipe L4
Kusen dan Pintu Besi unit 1.0000
Pekerja OH 0.4000
tenaga kerja Tukang OH 1.2000
kepala tukang OH
Mandor OH
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 Memasang 1 Unit Daun Pintu Triplek 5 mm Lapis Double Plywood tipe D2 ( 2 Pintu )
Frame Daun Pintu Papan Kayu kls. 1 M3 0.0768
Bahan Triplek lbr 4.0000
Plywood Lbr 4.0000
Kaca Polos Mati 5 mm M2 0.7200
List Alumunium 1 cm M1 19.2000
Lem Putih kayu kg 0.5000
Paku 1cm kg 0.1500
Finishing Melamik M2 8.0000
Pekerja Oh 0.7500
Tenaga Kerja Tukang Besi / Aluminium Oh 0.6000
Kepala Tukang Besi / Aluminium Oh 0.0600
Mandor Oh 0.0375
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 Memasang 1 Unit Daun Pintu Triplek 5 mm Lapis Double Plywood tipe D1 ( 1 Pintu )
Frame Daun Pintu Papan Kayu kls. 1 M3 0.0384
Bahan Triplek lbr 2.0000
Plywood Lbr 2.0000
Kaca Polos Mati 5 mm M2 0.3600
List Alumunium 1 cm M1 9.6000
Lem Putih kayu kg 0.5000
Paku 1cm kg 0.1500
Finishing Melamik M2 4.0000
Pekerja Oh 0.7500
Tenaga Kerja Tukang Besi / Aluminium Oh 0.6000
Kepala Tukang Besi / Aluminium Oh 0.0600
Mandor Oh 0.0375
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5 MEMASANG 1 UNIT KUSEN + DAUN PINTU KAYU DOUBLE TYPE D2
Bahan Kusen Aluminium Natural 4" M' 6.7000
Jumlah
Dibulatkan
6 MEMASANG 1 UNIT KUSEN + DAUN PINTU KAYU DOUBLE TYPE D1
Bahan Kusen Aluminium Natural 4" M' 4.4200
Asesoris Kusen Alumunium (35% dr bahan ) ls 1.0000
Daun Pintu Double Teakwood tipe D1 Unit 1.0000
Kunci Silinder dan Body untuk pintu Bh 1.0000
Handle Pintu Stainless Steel Psg 1.0000
Kaca Polos Mati 5 mm M2 0.3600
Engsel Pintu Psg 2.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
7 MEMASANG 1 UNIT JENDELA J1
Bahan Kusen Aluminium Natural 4" Jendela M1 4.0000
Kaca Polos 5mm Jendela M2 0.8625
Asesoris Kusen Alumunium (35% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
8 MEMASANG 1 UNIT JENDELA J2
Bahan Kusen Aluminium Natural 4" Jendela M1 41.0000
Kaca Polos 5mm Jendela M2 14.0400
Kusen Aluminium Natural 4" Bv M1 46.3000
Kaca Polos 5mm Bv M2 2.1450
Asesoris Kusen Alumunium (35% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
8 MEMASANG 1 UNIT JENDELA J1 Dinding Exterior
Bahan Kusen Aluminium Natural 4" Jendela M1 11.5200
Kaca Polos 5mm Jendela M2 2.0400
Kusen Aluminium Natural 4" Bv M1 10.4000
Kaca Polos 5mm Bv M2
Jumlah
Dibulatkan
J. PENETAPAN INDEK HARGA SATUAN PEKERJAAN LANGIT-LANGIT
1 Memasang 1 m2 Pasangan rangka langit - langit (60 X 60) cm besi hollow
Besi Hollow 4 x 4 M' 1.1000
Bahan Gantungan Besi dia 6 Kg 0.2750
Assesories dan Alat Bantu ls 1.0000
Pekerja Oh 0.0200
Tenaga Kerja Tukang Oh 0.1000
Kepala Tukang Oh 0.0200
Mandor Oh 0.0020
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 Memasang 1 m2 Langit-langit GRC t = 4 mm
Bahan Pelat GRC tebal 4mm Lbr 0.3470
Paku kg 0.0100
Pekerja Oh 0.0800
Tenaga Kerja Tukang kayu Oh 0.0400
Kepala tukang kayu Oh 0.0040
Mandor Oh 0.0040
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
3 Memasang 1 m2 Langit-langit Gypsumboard 9 mm
Pelat Gypsum Board Lbr 0.3640
Bahan Plaster Board Ls 1.0000
Paku Skrup kg 0.1100
Pekerja Oh 0.0800
Tenaga Kerja Tukang kayu Oh 0.0400
Kepala tukang kayu Oh 0.0040
Mandor Oh 0.0040
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 Memasang 1 m' list plafond gypsum profil
Bahan List gypsum profil m 1.0500
Tepung gypsum Kg 0.1500
Pekerja OH 0.0600
Tenaga Kerja Tukang kayu OH 0.0600
Kepala Tukang OH 0.0060
Mandor OH 0.0030
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5 Memasang 1 m' list plafond kayu profil
Bahan List kayu profil m 1.0500
Paku Kg 0.0500
Pekerja OH 0.0300
Tenaga Kerja Tukang kayu OH 0.0300
Kepala Tukang OH 0.0050
Mandor OH 0.0030
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
Assesories Ls 1.0000
Pekerja Oh -
Tenaga Kerja Tukang kayu Oh 0.2000
Kepala tukang kayu Oh -
Mandor Oh -
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
1 Memasang 1 m' Talang Metal Zincallum
Bahan Talang Metal Zincallum t= 0,8 mm m' 1.0500
Rangka L 50.50.5 kg 3.7500
Pekerja Oh 0.4000
Tenaga Kerja Tukang kayu Oh 0.2000
Kepala tukang kayu Oh 0.0200
Mandor Oh 0.0200
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 Memasang 1 m2 atap metal zincallum
Bahan Atap zincallum Gelombang t= 0,45 mm m2 1.1000
Skrup bh 4.0000
Pekerja Oh 0.1000
Tenaga Kerja Tukang kayu Oh 0.1000
Kepala tukang kayu Oh 0.0100
Mandor Oh 0.0100
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 Memasang 1 m2 solarflat
Bahan Atap Solarflat m2 1.1000
Skrup bh 4.0000
Pekerja Oh 0.1000
Tenaga Kerja Tukang kayu Oh 0.1000
Kepala tukang kayu Oh 0.0100
Mandor Oh 0.0100
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
3 Memasang 1 bh Roof drain STS Ø 3"
Bahan Roof drain Sts Ø 3" Bh 1.0000
Pekerja Oh 0.0100
Tenaga Kerja Tukang Batu Oh 0.1000
Kepala Tukang Batu Oh 0.0100
Mandor Oh 0.0050
Analisa Page 133
NO. KEBUTUHAN Sat. INDEKS
Jumlah
Dibulatkan
4 Memasang 1 bh Huruf 3 Dimensi Logam
Bahan Huruf Logam cm 30.0000
Asesoris Ls 1.0000
Pekerja Oh 0.1000
Tenaga Kerja Tukang Oh 0.1000
Kepala tukang kayu Oh -
Mandor Oh -
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5 Memasang 1 m2 Peredam Panas Atap
Bahan Allumunium Foil m2 1.0500
Glasswool kg 0.4500
Roofmesh m2 1.0500
Skrup bh 4.0000
Pekerja Oh 0.1000
Tenaga Kerja Tukang kayu Oh 0.1000
Kepala tukang kayu Oh 0.0100
Mandor Oh 0.0100
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
L. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PENGECATAN/LABURAN
1 1 m2 Pengecatan bidang Kayu baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Cat meni Kg 0.2000
Plamir Kg 0.1500
Bahan Cat dasar Kg 0.1700
Cat penutup Kg 0.2600
Ampelas Lbr 0.0100
Kwas 3" Bh 0.0500
Pekerja Oh 0.1000
Tenaga Kerja Tukang cat Oh 0.0180
Kepala tukang cat Oh 0.0120
Mandor Oh 0.0050
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 1 m2 Pengecatan bidang Besi baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Cat meni Kg 0.2000
Dempul Plastik Kg 0.1500
Bahan Cat dasar Kg 0.1700
Cat penutup Kg 0.2600
Ampelas Lbr 0.0100
Analisa Page 134
NO. KEBUTUHAN Sat. INDEKS
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5 1 m2 Pengecatan Plafond baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Plamir Kg 0.0500
Cat dasar Kg 0.1000
Bahan Cat penutup 2 x Kg 0.2600
Ampelas Lbr 0.1000
Roll Cat Bh 0.0250
Pekerja Oh 0.0400
Tenaga Kerja Tukang cat Oh 0.0800
Kepala tukang cat Oh 0.0080
Mandor Oh 0.0050
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
6 1 m2 Pelaburan kayu dengan melamic
Wood Filler Kg 0.2500
Wood Stain Kg 0.2200
Melamin Sending Siller MSS 123 Kg 0.2000
Bahan ML 131 Clear Danagloss Kg 0.1800
Tiner Ltr 1.3000
Ampelas Lbr 4.0000
Kwas 3" Bh 0.5000
Alat Bantu dll Ls 1.0000
Pekerja Oh 0.3500
Tenaga Kerja Tukang cat Oh 0.2500
Kepala tukang cat Oh 0.0250
Mandor Oh 0.0025
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
7 1 m2 Laburan Floor Hardener
Bahan Semen Floor Hardener Kg 5.0000
Tenaga Kerja Pekerja Oh 0.0700
Tukang Batu Oh 0.1200
Jumlah
PPN 10%
Jumlah+PPN
Dibulatkan
8 1 m2 Laburan Waterproofing Cementitious
Waterproofimg Cementitious Kg 0.5000
Ampelas lbr 0.5000
Bahan Kwas 3" bh 0.0100
Pekerja Oh 0.0200
Tenaga Kerja Tukang cat Oh 0.2000
Kepala tukang cat Oh 0.0200
Analisa Page 136
NO. KEBUTUHAN Sat. INDEKS
Mandor Oh 0.0100
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
Keramik 10 x 30 cm m2 0.1000
Bahan Semen portland Kg 1.6500
Pasir pasang M3 0.0032
Semen warna Kg 0.1000
Pekerja Oh 0.0620
Tenaga Kerja Tukang batu Oh 0.0350
Kepala tukang batu Oh 0.0035
Mandor Oh 0.0030
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
Jumlah
Dibulatkan
3 Memasang 1 m1 Saluran Air Batu Belah tipe 1
Galian Tanah m3 0.8100
Buangan tanah m3 0.8100
Batu Belah m3 0.5250
Jumlah
Dibulatkan
4 Memasang 1 m1 Saluran Air Batu Belah tipe 2 + Decker Beton
Galian Tanah m3 0.8100
Buangan tanah m3 0.8100
Batu Belah m3 0.5250
Plat Decker Beton K-250 t=15 cm m3 0.1260
Jumlah
Dibulatkan
5 Memasang 1 m1 Saluran Air Batu belah tipe 3
Galian Tanah m3 0.2500
Buangan tanah m3 0.2500
Batu Belah m3 1.2800
Adukan Speci. 1 : 3 m2 0.1500
Jumlah
Dibulatkan
6 Memasang 1 m1 Saluran Gravel U 50 cm tipe 4 + Decker Beton
Galian Tanah m3 0.7700
Buangan tanah m3 0.7700
Lantai kerja m3 0.0500
Plat Decker Beton K-250 t=10 cm m3 0.1000
Gravel U 20cm m' 1.0000
Pas.1/2 Bata add. 1 : 3 m2 0.6000
Plesteran add. 1 : 3 m2 0.6000
Acian m2 0.6000
Jumlah
Dibulatkan
7 Memasang 1 m1 Saluran Gravel U 50 cm tipe 5 + Grill Plat Besi
Galian Tanah m3 0.7700
Buangan tanah m3 0.7700
Lantai kerja m3 0.0500
Grill Plat Besi 40.4 mm m3 1.0000
Gravel U 20cm m' 1.0000
Pas.1/2 Bata add. 1 : 3 m2 0.6000
Plesteran add. 1 : 3 m2 0.6000
Acian m2 0.6000
Jumlah
Dibulatkan
13 Membuat 1 M2 Pagar Gerbang
Pipa 3" kg 18.0000
Pekerja OH 1.0500
Tenaga Kerja Tukang OH 1.0500
Kepala Tukang OH 0.1050
Mandor OH 0.0520
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
14 Membuat 1 m1 Pagar Panel Beton Precast
Pagar beton Precast uk. 240x40x15 Bh 7.0000
Pekerja OH 0.5000
Tenaga Kerja Tukang Batu OH 0.2500
Kepala Tukang Batu OH 0.0250
Mandor OH 0.0250
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
14 Membuat 1 bh Tiang Pagar Panel Beton Precast
Bahan Tiang beton uk.20x16x300 cm Bh 1.0000
Pekerja OH 0.5000
Tenaga Kerja Tukang Batu OH 0.2500
Kepala Tukang Batu OH 0.0250
Mandor OH 0.0250
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
6 Memasang 1 m1 Pagar Bata Finish Plester, Aci & Cat
Galian Tanah m3 0.7700
Buangan tanah m3 0.7700
Lantai kerja m3 0.0500
Pek. Beton Kolom Praktis 15/15, K-250 m3 0.0090
Pas.1/2 Bata add. 1 : 3 m2 1.2000
Plesteran add. 1 : 3 m2 2.4000
Acian m2 2.4000
Cat Dinding Exterior, sek. Vinilex m2 2.7000
Jumlah
Dibulatkan
1,261,000.00 15,132.00
17,000.00 340.00
1,261,000.00 8,827.00
75,000.00 7,500.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 550.00
24,299.00 18,050.00 42,349.00
2,429.90 1,805.00 4,234.90
26,728.90 19,855.00 46,583.90
26,700.00 19,800.00 46,000.00
90,000.00 67,500.00
110,000.00 2,750.00
- 70,250.00 70,250.00
- 7,025.00 7,025.00
- 77,275.00 77,275.00
- 77,200.00 77,200.00
90,000.00 81,000.00
110,000.00 4,950.00
- 85,950.00 85,950.00
- 8,595.00 8,595.00
- 94,545.00 94,545.00
- 94,500.00 94,500.00
194,000.00 194,000.00
19,400.00 19,400.00
- 213,400.00 213,400.00
- 21,340.00 21,340.00
- 234,740.00 234,740.00
- 234,700.00 234,700.00
75,000.00 75,000.00
110,000.00 55,000.00
18,500.00 18,500.00
- 148,500.00 148,500.00
- 14,850.00 14,850.00
- 163,350.00 163,350.00
Analisa Page 142
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
- 163,300.00 163,000.00
152,000.00 182,400.00
75,000.00 22,500.00
110,000.00 1,100.00
182,400.00 23,600.00 206,000.00
18,240.00 2,360.00 20,600.00
200,640.00 25,960.00 226,600.00
200,600.00 25,900.00 226,000.00
75,000.00 14,400.00
110,000.00 2,090.00
- 16,490.00 16,490.00
- 1,649.00 1,649.00
- 18,139.00 18,139.00
- 18,100.00 18,100.00
63,100.00 32,559.60
110,000.00 5,500.00
- 38,059.60 38,059.60
- 3,805.96 3,805.96
- 41,865.56 41,865.56
- 41,800.00 41,800.00
175,000.00 210,000.00
1,150.00 232,300.00
165,000.00 80,025.00
75,000.00 112,500.00
90,000.00 54,000.00
100,000.00 6,000.00
110,000.00 8,250.00
522,325.00 180,750.00 703,075.00
52,232.50 18,075.00 70,307.50
574,557.50 198,825.00 773,382.50
574,500.00 198,800.00 773,000.00
1,150.00 201,250.00
243,000.00 48,600.00
276,000.00 124,200.00
75,000.00 123,750.00
90,000.00 22,500.00
100,000.00 2,500.00
110,000.00 8,800.00
Analisa Page 143
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
374,050.00 157,550.00 531,600.00
37,405.00 15,755.00 53,160.00
411,455.00 173,305.00 584,760.00
411,400.00 173,300.00 584,700.00
1,150.00 241,500.00
243,000.00 72,900.00
276,000.00 138,000.00
- -
75,000.00 123,750.00
90,000.00 24,750.00
100,000.00 2,800.00
110,000.00 9,130.00
452,400.00 160,430.00 612,830.00
45,240.00 16,043.00 61,283.00
497,640.00 176,473.00 674,113.00
497,600.00 176,400.00 674,000.00
970,000.00 970,000.00
9,700.00 9,700.00
29,100.00 29,100.00
1,067,000.00 1,067,000.00
10,670.00 10,670.00
32,010.00 32,010.00
7,500.00 7,875.00
14,000.00 210.00
75,000.00 525.00
90,000.00 630.00
100,000.00 700.00
110,000.00 33.00
8,085.00 1,888.00 9,973.00
808.50 188.80 997.30
8,893.50 2,076.80 10,970.30
8,800.00 2,000.00 10,900.00
1,261,000.00 37,830.00
17,000.00 5,100.00
75,000.00 39,000.00
90,000.00 23,400.00
100,000.00 2,600.00
110,000.00 2,860.00
42,930.00 67,860.00 110,790.00
4,293.00 6,786.00 11,079.00
47,223.00 74,646.00 121,869.00
47,200.00 74,600.00 60,500.00
1,261,000.00 50,440.00
17,000.00 5,100.00
75,000.00 39,000.00
90,000.00 23,400.00
100,000.00 2,600.00
110,000.00 2,860.00
55,540.00 67,860.00 123,400.00
5,554.00 6,786.00 12,340.00
61,094.00 74,646.00 135,740.00
61,000.00 74,600.00 67,500.00
1,261,000.00 42,874.00
17,000.00 6,800.00
1,261,000.00 -
95,000.00 33,250.00
1,261,000.00 105,924.00
75,000.00 49,500.00
90,000.00 29,700.00
100,000.00 3,300.00
1,261,000.00 42,874.00
17,000.00 6,800.00
1,261,000.00 12,610.00
95,000.00 33,250.00
1,261,000.00 70,616.00
75,000.00 49,500.00
90,000.00 29,700.00
100,000.00 3,300.00
110,000.00 3,630.00
166,150.00 86,130.00 252,280.00
16,615.00 8,613.00 25,228.00
182,765.00 94,743.00 277,508.00
182,700.00 94,700.00 138,750.00
1,261,000.00 50,440.00
17,000.00 6,800.00
1,261,000.00 18,915.00
95,000.00 33,250.00
1,261,000.00 105,924.00
75,000.00 49,500.00
90,000.00 29,700.00
100,000.00 3,300.00
110,000.00 3,630.00
215,329.00 86,130.00 301,459.00
21,532.90 8,613.00 30,145.90
236,861.90 94,743.00 331,604.90
236,800.00 94,700.00 165,800.00
1,261,000.00 37,830.00
17,000.00 6,800.00
1,261,000.00 18,915.00
95,000.00 33,250.00
1,261,000.00 105,924.00
75,000.00 49,500.00
90,000.00 29,700.00
100,000.00 3,300.00
110,000.00 3,630.00
202,719.00 86,130.00 288,849.00
20,271.90 8,613.00 28,884.90
222,990.90 94,743.00 317,733.90
222,900.00 94,700.00 158,850.00
+ bekisting)
1,220,000.00 1,220,000.00
10,900.00 551,104.00
10,900.00 360,336.56
121,000.00 127,050.00
2,258,490.56 - 2,258,490.56
2,258,400.00 - 2,258,000.00
+ bekisting)
1,220,000.00 1,220,000.00
10,900.00 292,846.67
10,900.00 481,780.00
60,500.00 16,940.00
2,011,566.67 - 2,011,566.67
2,011,500.00 - 2,011,000.00
+ bekisting)
1,220,000.00 1,220,000.00
10,900.00 481,780.00
10,900.00 519,566.67
60,500.00 10,890.00
2,232,236.67 - 2,232,236.67
2,232,200.00 - 2,232,000.00
i + bekisting)
1,220,000.00 1,220,000.00
10,900.00 1,338,084.00
10,900.00 1,338,084.00
60,500.00 598,950.00
4,495,118.00 - 4,495,118.00
4,495,100.00 - 4,495,000.00
i + bekisting)
1,220,000.00 1,220,000.00
10,900.00 876,578.00
10,900.00 876,578.00
60,500.00 242,000.00
3,215,156.00 - 3,215,156.00
3,215,100.00 - 3,215,100.00
1,109,000.00 1,109,000.00
10,900.00 578,136.00
10,900.00 377,794.00
60,500.00 605,000.00
2,669,930.00 - 2,669,930.00
2,669,900.00 - 2,669,000.00
1,109,000.00 1,109,000.00
10,900.00 899,995.56
1,109,000.00 1,109,000.00
10,900.00 1,136,652.00
10,900.00 191,077.00
10,000.00 410,260.00
67,500.00 312,187.50
3,159,176.50 - 3,159,176.50
3,159,100.00 - 3,159,100.00
1,109,000.00 1,109,000.00
10,900.00 1,682,197.00
10,900.00 305,854.00
10,900.00 338,466.80
67,500.00 665,955.00
4,101,472.80 - 4,101,472.80
4,101,400.00 - 4,101,000.00
674,000.00 674,000.00
10,900.00 1,201,398.00
10,900.00 320,024.00
151,200.00 1,345,680.00
3,541,102.00 - 3,541,102.00
3,541,100.00 - 3,541,100.00
1,220,000.00 1,220,000.00
10,900.00 1,360,756.00
10,900.00 269,775.00
151,200.00 1,478,736.00
4,329,267.00 - 4,329,267.00
4,329,200.00 - 4,329,200.00
1,220,000.00 1,220,000.00
10,900.00
10,900.00
151,200.00 1,384,992.00
2,604,992.00 - 2,604,992.00
2,604,900.00 - 2,604,000.00
1,220,000.00 1,220,000.00
10,900.00 1,749,471.80
10,900.00 1,072,451.00
151,200.00 1,384,992.00
5,426,914.80 - 5,426,914.80
1,220,000.00 1,220,000.00
10,900.00 1,361,192.00
10,900.00 1,007,923.00
151,200.00 1,478,736.00
5,067,851.00 - 5,067,851.00
5,067,800.00 - 5,067,800.00
1,109,000.00 1,109,000.00
10,000.00 825,684.00
10,000.00 622,216.00
138,750.00 1,293,705.00
3,850,605.00 - 3,850,605.00
3,850,600.00 - 3,850,600.00
bekisting)
1,109,000.00 1,109,000.00
10,900.00
10,900.00
10,900.00
138,750.00 1,155,093.75
2,264,093.75 - 2,264,093.75
2,264,000.00 - 2,264,000.00
ekisting)
1,109,000.00 1,109,000.00
10,900.00
10,900.00
10,900.00
138,750.00 1,155,093.75
2,264,093.75 - 2,264,093.75
2,264,000.00 - 2,264,000.00
1,109,000.00 1,109,000.00
10,900.00 526,993.20
10,900.00 191,164.20
10,900.00 170,890.20
138,750.00 1,155,093.75
3,153,141.35 - 3,153,141.35
3,153,100.00 - 3,153,100.00
1,109,000.00 1,109,000.00
10,900.00
10,900.00
10,900.00
138,750.00 1,416,637.50
2,525,637.50 - 2,525,637.50
2,525,600.00 - 2,525,600.00
1,109,000.00 1,109,000.00
10,900.00
10,900.00
10,900.00
138,750.00 1,416,637.50
2,525,637.50 - 2,525,637.50
2,525,600.00 - 2,525,600.00
1,109,000.00 1,109,000.00
10,900.00 955,821.00
10,900.00 382,328.40
10,900.00 556,488.60
138,750.00 847,068.75
3,850,706.75 - 3,850,706.75
3,850,700.00 - 3,850,700.00
1,109,000.00 1,109,000.00
10,900.00 899,995.56
10,900.00 126,157.41
10,900.00 678,215.44
138,750.00 1,293,705.00
4,107,073.41 - 4,107,073.41
4,107,000.00 - 4,107,000.00
1,109,000.00 1,109,000.00
10,900.00
10,900.00
10,900.00
10,900.00
10,900.00
10,900.00
10,900.00 90,833.33
158,850.00 1,588,500.00
2,788,333.33 - 2,788,333.33
2,788,300.00 - 2,788,300.00
esi + bekisting)
1,109,000.00 1,109,000.00
10,900.00 900,165.60
10,900.00 630,118.10
60,500.00 505,507.75
3,144,791.45 - 3,144,791.45
3,144,700.00 - 3,144,700.00
1,109,000.00 1,109,000.00
10,900.00
10,900.00
674,000.00 674,000.00
10,900.00 717,583.33
165,800.00 2,039,340.00
3,430,923.33 - 3,430,923.33
3,430,900.00 - 3,430,000.00
674,000.00 674,000.00
10,000.00 83,333.00
10,000.00 6,644.40
151,200.00 945,000.00
1,708,977.40 - 1,708,977.40
1,708,900.00 - 1,708,900.00
1,109,000.00 1,109,000.00
10,900.00 635,106.67
10,900.00 113,905.00
60,500.00 242,000.00
2,100,011.67 - 2,100,011.67
2,100,000.00 - 2,100,000.00
1,109,000.00 1,109,000.00
10,900.00 577,302.76
Analisa Page 151
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
10,900.00 577,302.76
60,500.00 387,200.00
2,650,805.51 - 2,650,805.51
2,650,800.00 - 2,650,800.00
spesi 1 PC : 3 PP
650.00 45,500.00
1,150.00 18,946.25
165,000.00 7,507.50
75,000.00 22,500.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 1,650.00
71,953.75 34,150.00 106,103.75
7,195.38 3,415.00 10,610.38
79,149.13 37,565.00 116,714.13
79,100.00 37,500.00 116,700.00
spesi 1 PC : 5 PP
650.00 45,500.00
1,150.00 11,132.00
165,000.00 7,425.00
75,000.00 22,500.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 1,650.00
64,057.00 34,150.00 98,207.00
6,405.70 3,415.00 9,820.70
70,462.70 37,565.00 108,027.70
70,400.00 37,500.00 108,000.00
6,800.00 85,000.00
1,150.00 11,132.00
165,000.00 7,425.00
75,000.00 22,500.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 1,650.00
103,557.00 34,150.00 137,707.00
10,355.70 3,415.00 13,770.70
113,912.70 37,565.00 151,477.70
113,900.00 37,500.00 151,000.00
1,150.00 12,420.00
165,000.00 4,290.00
75,000.00 7,500.00
90,000.00 10,800.00
1,150.00 8,383.50
165,000.00 4,620.00
75,000.00 7,500.00
90,000.00 10,800.00
100,000.00 2,000.00
110,000.00 1,375.00
13,003.50 21,675.00 34,678.50
1,300.35 2,167.50 3,467.85
14,303.85 23,842.50 38,146.35
14,300.00 23,800.00 38,100.00
1,150.00 4,600.00
75,000.00 7,500.00
90,000.00 10,800.00
100,000.00 2,000.00
110,000.00 1,375.00
4,600.00 21,675.00 26,275.00
460.00 2,167.50 2,627.50
5,060.00 23,842.50 28,902.50
5,000.00 23,800.00 28,000.00
1,150.00 4,600.00
75,000.00 10,725.00
90,000.00 9,630.00
100,000.00 1,050.00
110,000.00 1,100.00
4,600.00 22,505.00 27,105.00
460.00 2,250.50 2,710.50
5,060.00 24,755.50 29,815.50
5,000.00 24,700.00 29,800.00
7,500.00 7,537.50
24,000.00 1,200.00
75,000.00 4,500.00
100,000.00 6,000.00
100,000.00 600.00
110,000.00 660.00
8,737.50 11,760.00 20,497.50
Analisa Page 153
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
873.75 1,176.00 2,049.75
9,611.25 12,936.00 22,547.25
9,600.00 12,900.00 22,500.00
24,000.00 960.00
75,000.00 300.00
100,000.00 200.00
100,000.00 20.00
110,000.00 22.00
8,500.00 9,775.00
24,000.00 960.00
75,000.00 3,000.00
100,000.00 4,000.00
100,000.00 400.00
110,000.00 220.00
10,735.00 7,620.00 18,355.00
1,073.50 762.00 1,835.50
11,808.50 8,382.00 20,190.50
11,800.00 8,300.00 20,000.00
20,000.00 20,000.00
24,000.00 960.00
75,000.00 3,000.00
100,000.00 4,000.00
100,000.00 400.00
110,000.00 220.00
20,960.00 7,620.00 28,580.00
2,096.00 762.00 2,858.00
23,056.00 8,382.00 31,438.00
23,000.00 8,300.00 31,000.00
7,500.00 8,625.00
24,000.00 960.00
75,000.00 3,000.00
100,000.00 4,000.00
100,000.00 400.00
110,000.00 220.00
9,585.00 7,620.00 17,205.00
958.50 762.00 1,720.50
7,500.00
24,000.00
75,000.00 1,500.00
100,000.00 2,000.00
100,000.00 200.00
110,000.00 110.00
- 3,810.00 3,810.00
- 381.00 381.00
- 4,191.00 4,191.00
- 4,100.00 4,100.00
7,000.00 8,050.00
24,000.00 960.00
75,000.00 4,500.00
100,000.00 6,000.00
100,000.00 600.00
110,000.00 330.00
9,010.00 11,430.00 20,440.00
901.00 1,143.00 2,044.00
9,911.00 12,573.00 22,484.00
9,900.00 12,500.00 22,400.00
- -
24,000.00 960.00
75,000.00 4,500.00
100,000.00 6,000.00
100,000.00 600.00
110,000.00 330.00
960.00 11,430.00 12,390.00
96.00 1,143.00 1,239.00
1,056.00 12,573.00 13,629.00
1,000.00 12,500.00 13,600.00
131,000.00 131,000.00
75,000.00 90,000.00
100,000.00 120,000.00
- -
- -
131,000.00 210,000.00 341,000.00
13,100.00 21,000.00 34,100.00
144,100.00 231,000.00 375,100.00
144,100.00 231,000.00 375,100.00
131,000.00 131,000.00
8,500.00 23,120.00
7,500.00 2,100.00
40,001.50 40,001.50
45,100.00 49,610.00
57,415.75 57,415.75
-
114,831.50 57,415.75 172,247.25
114,800.00 57,400.00 172,000.00
243,000.00 267,300.00
94,344.25 94,344.25
45,100.00 2,255.00
36,389.93 36,389.93
-
363,899.25 36,389.93 400,289.18
363,800.00 36,300.00 400,000.00
223,000.00 245,300.00
8,500.00 17,680.00
8,500.00 30,345.00
102,663.75 102,663.75
29,699.16 29,699.16
9,899.72 9,899.72
435,587.63 - 435,587.63
435,500.00 - 435,500.00
4,000.00 320,000.00
138,100.00 88,384.00
8,500.00 17,680.00
- -
31,954.80 31,954.80
10,651.60 10,651.60
468,670.40 - 468,670.40
468,600.00 - 468,600.00
61,954.80 61,954.80
20,651.60 20,651.60
908,670.40 - 908,670.40
908,600.00 - 908,600.00
8,500.00 421,600.00
8,500.00 91,800.00
24,000.00 1,200.00
75,000.00 78,750.00
90,000.00 94,500.00
100,000.00 10,500.00
110,000.00 5,720.00
514,600.00 189,470.00 704,070.00
51,460.00 18,947.00 70,407.00
566,060.00 208,417.00 774,477.00
566,000.00 208,400.00 774,400.00
131,000.00 131,000.00
20,000.00 144,000.00
1,000.00 9,000.00
75,000.00 37,500.00
90,000.00 45,000.00
100,000.00 500.00
110,000.00 3,300.00
284,000.00 86,300.00 370,300.00
28,400.00 8,630.00 37,030.00
312,400.00 94,930.00 407,330.00
312,400.00 94,900.00 407,000.00
78,000.00 78,000.00
105,000.00 420,000.00
1,000.00 9,000.00
75,000.00 37,500.00
90,000.00 45,000.00
100,000.00 500.00
110,000.00 3,300.00
507,000.00 86,300.00 593,300.00
50,700.00 8,630.00 59,330.00
557,700.00 94,930.00 652,630.00
557,700.00 94,900.00 652,000.00
20,000.00 54,400.00
20,000.00 92,400.00
22,500.00 6,300.00
108,025.50 108,025.50
45,100.00 49,610.00
155,367.75 155,367.75
-
310,735.50 155,367.75 466,103.25
31,073.55 15,536.78 46,610.33
341,809.05 170,904.53 512,713.58
341,800.00 170,900.00 512,700.00
11,000.00 11,110.00
33,396.00 33,396.00
45,100.00 49,610.00
301,171.20 301,171.20
-
94,116.00 301,171.20 395,287.20
9,411.60 30,117.12 39,528.72
103,527.60 331,288.32 434,815.92
103,500.00 331,200.00 434,800.00
243,000.00 243,000.00
75,000.00 30,000.00
90,000.00 108,000.00
485,000.00 485,000.00
75,000.00 30,000.00
90,000.00 108,000.00
4,850,000.00 4,850,000.00
75,000.00 30,000.00
90,000.00 108,000.00
9,215,000.00 707,712.00
67,000.00 268,000.00
116,000.00 464,000.00
87,000.00 62,640.00
4,000.00 76,800.00
49,000.00 24,500.00
17,000.00 2,550.00
126,100.00 1,008,800.00
75,000.00 56,250.00
90,000.00 54,000.00
100,000.00 6,000.00
110,000.00 4,125.00
2,615,002.00 120,375.00 2,735,377.00
261,500.20 12,037.50 273,537.70
2,876,502.20 132,412.50 3,008,914.70
2,876,500.00 132,400.00 3,008,900.00
9,215,000.00 353,856.00
67,000.00 134,000.00
116,000.00 232,000.00
87,000.00 31,320.00
4,000.00 38,400.00
49,000.00 24,500.00
17,000.00 2,550.00
126,100.00 504,400.00
75,000.00 56,250.00
90,000.00 54,000.00
100,000.00 6,000.00
110,000.00 4,125.00
1,321,026.00 120,375.00 1,441,401.00
132,102.60 12,037.50 144,140.10
1,453,128.60 132,412.50 1,585,541.10
1,453,100.00 132,400.00 1,585,500.00
87,000.00 582,900.00
87,000.00 384,540.00
134,589.00 134,589.00
1,585,500.00 1,585,500.00
291,000.00 291,000.00
146,000.00 146,000.00
87,000.00 31,320.00
58,000.00 116,000.00
268,894.90 268,894.90
67,223.73 67,223.73
87,000.00 348,000.00
87,000.00 75,037.50
148,063.13 148,063.13
57,110.06 57,110.06
14,277.52 14,277.52
571,100.63 71,387.58 642,488.20
571,100.00 71,300.00 642,400.00
87,000.00 3,567,000.00
87,000.00 1,221,480.00
87,000.00 4,028,100.00
87,000.00 186,615.00
3,151,118.25 3,151,118.25
1,215,431.33 1,215,431.33
303,857.83 303,857.83
12,154,313.25 1,519,289.16 13,673,602.41
12,154,300.00 1,519,200.00 13,673,600.00
87,000.00 1,002,240.00
87,000.00 177,480.00
87,000.00 904,800.00
87,000.00 -
87,000.00 1,670,400.00
87,000.00 295,800.00
87,000.00 1,444,200.00
87,000.00 -
1,193,640.00 1,193,640.00
460,404.00 460,404.00
115,101.00 115,101.00
4,604,040.00 575,505.00 5,179,545.00
4,604,000.00 575,500.00 5,179,000.00
87,000.00 1,461,600.00
87,000.00 420,210.00
658,633.50 658,633.50
254,044.35 254,044.35
63,511.09 63,511.09
2,540,443.50 317,555.44 2,857,998.94
2,540,400.00 317,500.00 2,857,900.00
87,000.00 464,580.00
87,000.00 85,260.00
192,444.00 192,444.00
74,228.40 74,228.40
18,557.10 18,557.10
742,284.00 92,785.50 835,069.50
742,200.00 92,700.00 835,000.00
375,100.00 2,565,684.00
256,568.40 256,568.40
-
70,556.31 70,556.31
2,822,252.40 70,556.31 2,892,808.71
2,822,200.00 70,500.00 2,892,800.00
375,100.00 2,475,660.00
247,566.00 247,566.00
-
68,080.65 68,080.65
2,723,226.00 68,080.65 2,791,306.65
2,723,200.00 68,000.00 2,791,300.00
375,100.00 2,115,564.00
375,100.00 1,980,528.00
198,052.80 198,052.80
-
54,464.52 54,464.52
2,178,580.80 54,464.52 2,233,045.32
2,178,500.00 54,400.00 2,233,000.00
375,100.00 1,665,444.00
166,544.40 166,544.40
-
45,799.71 45,799.71
1,831,988.40 45,799.71 1,877,788.11
1,831,900.00 45,700.00 1,877,700.00
375,100.00 1,530,408.00
153,040.80 153,040.80
-
42,086.22 42,086.22
1,683,448.80 42,086.22 1,725,535.02
1,683,400.00 42,000.00 1,725,500.00
87,000.00 817,800.00
87,000.00 146,160.00
337,386.00 337,386.00
130,134.60 130,134.60
32,533.65 32,533.65
1,301,346.00 162,668.25 1,464,014.25
1,301,300.00 162,600.00 1,464,000.00
87,000.00 443,700.00
87,000.00 69,600.00
179,655.00 179,655.00
69,295.50 69,295.50
17,323.88 17,323.88
692,955.00 86,619.38 779,574.38
692,900.00 86,600.00 779,500.00
87,000.00 243,600.00
87,000.00 34,800.00
97,440.00 97,440.00
37,584.00 37,584.00
87,000.00 278,400.00
126,000.00 80,640.00
125,664.00 125,664.00
48,470.40 48,470.40
12,117.60 12,117.60
484,704.00 60,588.00 545,292.00
484,700.00 60,500.00 545,200.00
87,000.00 504,600.00
126,000.00 80,640.00
204,834.00 204,834.00
79,007.40 79,007.40
19,751.85 19,751.85
790,074.00 98,759.25 888,833.25
790,000.00 98,700.00 888,000.00
20,000.00 38,400.00
20,000.00 96,000.00
20,000.00 11,200.00
20,000.00 82,200.00
45,100.00 49,610.00
138,705.00 138,705.00
-
277,410.00 138,705.00 416,115.00
277,400.00 138,700.00 416,100.00
8,000.00 8,800.00
7,000.00 1,925.00
536.25 536.25
75,000.00 1,500.00
90,000.00 9,000.00
100,000.00 2,000.00
110,000.00 220.00
11,261.25 12,720.00 23,981.25
1,126.13 1,272.00 2,398.13
12,387.38 13,992.00 26,379.38
12,300.00 13,900.00 26,000.00
58,000.00 20,126.00
67,000.00 24,388.00
1,219.40 1,219.40
17,000.00 1,870.00
75,000.00 6,000.00
90,000.00 3,600.00
100,000.00 400.00
110,000.00 440.00
27,477.40 10,440.00 37,917.40
2,747.74 1,044.00 3,791.74
30,225.14 11,484.00 41,709.14
30,200.00 11,400.00 41,700.00
16,000.00 16,800.00
4,000.00 600.00
75,000.00 4,500.00
90,000.00 5,400.00
100,000.00 600.00
110,000.00 330.00
17,400.00 10,830.00 28,230.00
1,740.00 1,083.00 2,823.00
19,140.00 11,913.00 31,053.00
19,100.00 11,900.00 31,000.00
- -
17,000.00 850.00
75,000.00 2,250.00
90,000.00 2,700.00
100,000.00 500.00
110,000.00 330.00
850.00 5,780.00 6,630.00
85.00 578.00 663.00
935.00 6,358.00 7,293.00
900.00 6,300.00 7,200.00
34,000.00 34,000.00
Analisa Page 164
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
1,700.00 1,700.00
75,000.00 -
90,000.00 18,000.00
100,000.00 -
110,000.00 -
35,700.00 18,000.00 53,700.00
3,570.00 1,800.00 5,370.00
39,270.00 19,800.00 59,070.00
39,200.00 19,800.00 59,000.00
44,000.00 46,200.00
20,000.00 75,000.00
75,000.00 30,000.00
90,000.00 18,000.00
100,000.00 2,000.00
110,000.00 2,200.00
121,200.00 52,200.00 173,400.00
12,120.00 5,220.00 17,340.00
133,320.00 57,420.00 190,740.00
133,300.00 57,400.00 190,000.00
78,000.00 85,800.00
1,000.00 4,000.00
75,000.00 7,500.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 1,100.00
89,800.00 18,600.00 108,400.00
8,980.00 1,860.00 10,840.00
98,780.00 20,460.00 119,240.00
98,700.00 20,400.00 119,200.00
78,000.00 85,800.00
1,000.00 4,000.00
75,000.00 7,500.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 1,100.00
89,800.00 18,600.00 108,400.00
8,980.00 1,860.00 10,840.00
98,780.00 20,460.00 119,240.00
98,700.00 20,400.00 119,200.00
68,000.00 68,000.00
75,000.00 750.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 550.00
Analisa Page 165
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
68,000.00 11,300.00 79,300.00
68,000.00 11,300.00 79,300.00
4,000.00 120,000.00
12,000.00 12,000.00
75,000.00 7,500.00
90,000.00 9,000.00
- -
- -
132,000.00 16,500.00 148,500.00
13,200.00 1,650.00 14,850.00
145,200.00 18,150.00 163,350.00
145,200.00 18,100.00 163,300.00
13,000.00 13,650.00
1,000.00 4,000.00
90,000.00 9,000.00
100,000.00 10,000.00
110,000.00 1,100.00
- -
17,650.00 20,100.00 37,750.00
1,765.00 2,010.00 3,775.00
19,415.00 22,110.00 41,525.00
19,400.00 22,100.00 41,000.00
49,000.00 9,800.00
52,000.00 7,800.00
- -
47,000.00 12,220.00
4,500.00 45.00
6,000.00 300.00
75,000.00 7,500.00
90,000.00 1,620.00
100,000.00 1,200.00
110,000.00 550.00
30,165.00 10,870.00 41,035.00
3,016.50 1,087.00 4,103.50
33,181.50 11,957.00 45,138.50
33,100.00 11,900.00 45,100.00
49,000.00 9,800.00
52,000.00 7,800.00
- -
47,000.00 12,220.00
5,500.00 55.00
Analisa Page 166
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
6,000.00 300.00
75,000.00 7,500.00
90,000.00 1,620.00
100,000.00 1,200.00
110,000.00 550.00
30,175.00 10,870.00 41,045.00
3,017.50 1,087.00 4,104.50
33,192.50 11,957.00 45,149.50
33,100.00 11,900.00 45,100.00
47,000.00 11,750.00
49,000.00 10,780.00
52,000.00 10,400.00
12,000.00 15,600.00
5,500.00 22,000.00
3,526.50 3,526.50
75,000.00 26,250.00
90,000.00 22,500.00
100,000.00 2,500.00
110,000.00 275.00
74,056.50 51,525.00 125,581.50
7,405.65 5,152.50 12,558.15
81,462.15 56,677.50 138,139.65
81,400.00 56,600.00 138,100.00
- -
16,000.00 4,160.00
4,500.00 450.00
22,000.00 550.00
75,000.00 3,000.00
90,000.00 7,200.00
100,000.00 800.00
110,000.00 550.00
5,160.00 11,550.00 16,710.00
516.00 1,155.00 1,671.00
5,676.00 12,705.00 18,381.00
5,600.00 12,700.00 18,300.00
NTERIOR)
16,000.00 1,600.00
- -
16,000.00 4,160.00
4,500.00 450.00
22,000.00 550.00
75,000.00 3,000.00
90,000.00 7,200.00
100,000.00 800.00
110,000.00 550.00
16,000.00 800.00
- -
16,000.00 4,160.00
4,500.00 450.00
22,000.00 550.00
75,000.00 3,000.00
90,000.00 7,200.00
100,000.00 800.00
110,000.00 550.00
5,960.00 11,550.00 17,510.00
596.00 1,155.00 1,751.00
6,556.00 12,705.00 19,261.00
6,500.00 12,700.00 19,200.00
23,000.00 5,750.00
49,000.00 10,780.00
58,000.00 11,600.00
39,000.00 7,020.00
- -
5,500.00 22,000.00
6,000.00 3,000.00
3,007.50 3,007.50
75,000.00 26,250.00
90,000.00 22,500.00
100,000.00 2,500.00
110,000.00 275.00
63,157.50 51,525.00 114,682.50
6,315.75 5,152.50 11,468.25
69,473.25 56,677.50 126,150.75
69,400.00 56,600.00 126,100.00
8,000.00 40,000.00
75,000.00 5,250.00
90,000.00 10,800.00
40,000.00 16,050.00 56,050.00
4,000.00 1,605.00 5,605.00
44,000.00 17,655.00 61,655.00
44,000.00 17,600.00 61,600.00
63,000.00 31,500.00
4,500.00 2,250.00
6,000.00 60.00
75,000.00 1,500.00
90,000.00 18,000.00
100,000.00 2,000.00
Analisa Page 168
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
110,000.00 1,100.00
33,810.00 22,600.00 56,410.00
3,381.00 2,260.00 5,641.00
37,191.00 24,860.00 62,051.00
37,100.00 24,800.00 62,000.00
75,000.00 75,000.00
1,150.00 13,087.00
165,000.00 6,930.00
6,000.00 9,000.00
75,000.00 46,500.00
90,000.00 31,500.00
100,000.00 3,500.00
110,000.00 3,300.00
104,017.00 84,800.00 188,817.00
10,401.70 8,480.00 18,881.70
114,418.70 93,280.00 207,698.70
114,400.00 93,200.00 207,600.00
41,000.00 41,000.00
1,150.00 13,087.00
165,000.00 6,930.00
6,000.00 9,000.00
75,000.00 46,500.00
90,000.00 31,500.00
100,000.00 3,500.00
110,000.00 3,300.00
70,017.00 84,800.00 154,817.00
7,001.70 8,480.00 15,481.70
77,018.70 93,280.00 170,298.70
77,000.00 93,200.00 170,000.00
51,000.00 51,000.00
1,150.00 13,087.00
165,000.00 6,930.00
6,000.00 9,000.00
75,000.00 46,500.00
90,000.00 31,500.00
100,000.00 3,500.00
110,000.00 3,300.00
80,017.00 84,800.00 164,817.00
8,001.70 8,480.00 16,481.70
88,018.70 93,280.00 181,298.70
88,000.00 93,200.00 181,200.00
87,000.00 95,700.00
75,000.00 1,125.00
90,000.00 13,500.00
100,000.00 1,500.00
110,000.00 82.50
95,700.00 16,207.50 111,907.50
9,570.00 1,620.75 11,190.75
105,270.00 17,828.25 123,098.25
105,200.00 17,800.00 123,000.00
87,000.00 95,700.00
75,000.00 1,125.00
90,000.00 13,500.00
100,000.00 1,500.00
110,000.00 82.50
95,700.00 16,207.50 111,907.50
9,570.00 1,620.75 11,190.75
105,270.00 17,828.25 123,098.25
105,200.00 17,800.00 123,000.00
243,000.00 243,000.00
85,050.00 85,050.00
75,000.00 247,500.00
90,000.00 99,000.00
100,000.00 100.00
110,000.00 17,600.00
328,050.00 364,200.00 692,250.00
32,805.00 36,420.00 69,225.00
360,855.00 400,620.00 761,475.00
360,800.00 400,600.00 761,400.00
92,000.00 92,000.00
75,000.00 750.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 550.00
92,000.00 11,300.00 103,300.00
9,200.00 1,130.00 10,330.00
101,200.00 12,430.00 113,630.00
101,200.00 12,400.00 113,600.00
136,000.00 136,000.00
75,000.00 750.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 550.00
136,000.00 11,300.00 147,300.00
13,600.00 1,130.00 14,730.00
149,600.00 12,430.00 162,030.00
149,600.00 12,400.00 162,000.00
AN JALAN
44,000.00 44,440.00
243,000.00 24,300.00
75,000.00 18,750.00
90,000.00 45,000.00
100,000.00 2,500.00
110,000.00 330.00
68,740.00 66,580.00 135,320.00
6,874.00 6,658.00 13,532.00
75,614.00 73,238.00 148,852.00
75,600.00 73,200.00 148,800.00
77,200.00 19,300.00
41,800.00 10,450.00
13,000.00 13,000.00
42,000.00 6,300.00
Analisa Page 171
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
49,050.00 - 49,050.00
49,000.00 - 49,000.00
77,200.00 62,532.00
41,800.00 33,858.00
773,000.00 405,825.00
502,215.00 - 502,215.00
502,200.00 - 502,200.00
77,200.00 62,532.00
41,800.00 33,858.00
773,000.00 405,825.00
2,483,000.00 312,858.00
815,073.00 - 815,073.00
815,000.00 - 815,000.00
77,200.00 19,300.00
41,800.00 10,450.00
773,000.00 989,440.00
42,000.00 6,300.00
1,025,490.00 - 1,025,490.00
1,025,400.00 - 1,025,400.00
77,200.00 59,444.00
41,800.00 32,186.00
674,000.00 33,700.00
1,109,000.00 110,900.00
121,000.00 121,000.00
108,000.00 64,800.00
42,000.00 25,200.00
29,800.00 17,880.00
465,110.00 - 465,110.00
465,100.00 - 465,100.00
77,200.00 59,444.00
41,800.00 32,186.00
674,000.00 33,700.00
2,483,000.00 2,483,000.00
121,000.00 121,000.00
108,000.00 64,800.00
42,000.00 25,200.00
29,800.00 17,880.00
2,837,210.00 - 2,837,210.00
2,837,200.00 - 2,837,200.00
8,500.00 153,000.00
75,000.00 78,750.00
90,000.00 94,500.00
100,000.00 10,500.00
110,000.00 5,720.00
264,850.00 189,470.00 454,320.00
26,485.00 18,947.00 45,432.00
291,335.00 208,417.00 499,752.00
291,300.00 208,400.00 499,700.00
73,000.00 511,000.00
75,000.00 37,500.00
90,000.00 22,500.00
100,000.00 2,500.00
110,000.00 2,750.00
511,000.00 65,250.00 576,250.00
51,100.00 6,525.00 57,625.00
562,100.00 71,775.00 633,875.00
562,100.00 71,700.00 633,800.00
204,000.00 204,000.00
75,000.00 37,500.00
90,000.00 22,500.00
100,000.00 2,500.00
110,000.00 2,750.00
204,000.00 65,250.00 269,250.00
20,400.00 6,525.00 26,925.00
224,400.00 71,775.00 296,175.00
224,400.00 71,700.00 296,100.00
77,200.00 59,444.00
41,800.00 32,186.00
674,000.00 33,700.00
4,329,200.00 38,962.80
108,000.00 129,600.00
42,000.00 100,800.00
29,800.00 71,520.00
18,300.00 49,410.00
466,212.80 - 466,212.80
466,200.00 - 466,200.00
1 1 M1 PEKERJAAN TIANG PANCANG BETON BERTULANG SQUARE 25X25 CM (Analisa PU 2012, A.4.1, F.04, La
A Tenaga:
Pekerja L01 oh 0.035
Mandor L04 oh 0.005
B Bahan:
Tiang Pancang Square 25 M23 m1 1.030
C Peralatan:
Alat Pancang, Jacked in Pile, Hydraulic Jacked E02 hari-sewa 0.035
Piling Sytem
Alat Penyambung Tiang Pancang E03 bh 0.250
D Jumlah (A+B+C)
E Over Head & Profit
F Jumlah (D+E)
G Dibulatkan (F)
75,000.00 2,625.00
110,000.00 550.00
218,000.00 224,540.00
257,000.00 8,995.00
49,000.00 12,250.00
224,540.00 24,420.00 248,960.00
24,896.00
273,856.00
273,800.00
25 Lem Kuning kg
26 Sealent Karet kg
27 Floor Hardener sek. Sika kg
28 Sealent per m' m1
35 Kusen Lip Chanel 100.50.20.2,3 uk. 160cm tinggi 210 cm & Pintu uk. 2x80cm unit
Plat Besi 1 mm Rangka Hollow 40x40 Lkp. Asesoris Finish Cat
36 Door Closer ps
37 Frame Pintu Kaca Alumunium ( Frameless ) sek. Alexindo psg
38 Kusen & Pintu Allummunium Spanrel unit
39 List Alumunium 1 cm m2
40 Atap Polycarbonat t= 6 mm m2
41 SolarFlat m2
42 Huruf 3 Dimensi ( bhn. Plat ) /1 cm cm
43 Roofdrain Sts Ø 3" bh
44 Rangka Hollow 2/4 m1
45 Pipa Ø 2 " m1
46 Pipa Ø 6 " m1
47 Karet dilatasi m1
48 Ram Kawat m2
H. BAHAN KACA
1 Kaca Polos 5 mm sek. Mulia m2
2 Kaca Tempered 12 mm sek. Mulia m2
3 Kaca Tempered 10 mm sek. Mulia m2
4 Kaca Tempered 8 mm sek. Mulia m2
N. ALAT BERAT
1 Galian Tanah dengan Excavator & Buang Tanah dg Dump Truck kap. 6 m3 m3
sejauh 20 km
2 Alat Pancang, Jacked in Pile, Hydraulic Jacked Piling Sytem hari-sewa
3 Alat Penyambung Tiang Pancang bh
4 Mobilisasi Alat Pancang Tipe Jack in Pile Ls
63,100
152,000
152,000
165,000
243,000
194,000
276,000
276,000
262,000
175,000
121,000
6,800
650
44,000
53,000
46,000
45,000
65,000
13,000
1,150
970,000
1,067,000
6,000
###
16,000
16,000
16,000
63,000
73,000
22,000
8,500
6,000
23,000
7,000
12,000
4,500
5,500
52,000
49,000
75,000
47,000
47,000
58,000
49,000
32,000
39,000
38,000
32,000
2,598,000
8,746,000
9,215,000
1,261,000
24,000
58,000
67,000
16,000
###
67,000
95,000
140,000
171,000
162,000
116,000
116,000
75,000
41,000
51,000
7,000
7,500
7,500
8,500
7,500
11,000
14,000
24,000
8,000
87,000
92,000
121,000
223,000
131,000
49,000
243,000
291,000
146,000
582,000
291,000
68,000
78,000
58,000
49,000
146,000
Bahan Page 185
HARGA SAT
Rp.
146,000
1,455,000
87,000
170,000
126,000
49,000
39,000
126,000
243,000
87,000
446,000
398,000
373,000
17,000
17,000
16,000
17,000
20,000
12,000
7,000
2,000
1,000
20,000
243,000
94,000
92,000
136,000
13,000
78,000
44,000
34,000
155,000
116,000
15,000.00
73,000.00
204,000.00
Bahan Page 187
HARGA SAT
Rp.
194,000.00
-
257,000.00
49,000.00
24,250,000.00
218,000.00
49,000.00
243,000.00
Bulan Pelaksanaan
1 2 3 4 5
NO URAIAN PEKERJAAN Bobot
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
1-7 8 - 14 15 - 21 22 - 28 29 - 35 36 - 42 43 - 49 50 - 56 57 - 63 64 - 70 71 - 77 78 - 84 85 - 91 92 - 98 99 - 105 106 - 112 113 - 119 120
D PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI BASEMENT / LANTAI DASAR
II PEKERJAAN LANTAI 1 19.68 1.640 1.640 1.640 1.640 1.640 1.640 1.640 1.640 1.640 1.640 1.640 1.640
III PEKERJAAN LANTAI 2 16.02 1.335 1.335 1.335 1.335 1.335 1.335 1.335 1.335 1.335 1.335 1.335 1.335
IV PEKERJAAN LANTAI DAK BETON 2.19 0.438 0.438 0.438 0.438 0.438
II BANGUNAN SAMPING
A PEKERJAAN STRUKTUR DAN ATAP
I PEKERJAAN PERSIAPAN
II PEKERJAAN GALIAN TANAH & URUGAN
III PEKERJAAN PONDASI
IV PEKERJAAN BETON LANTAI DASAR 0.30 0.101 0.101 0.101
V PEKERJAAN BETON LANTAI 1 0.55 0.183 0.183 0.183
VI PEKERJAAN BETON LANTAI 2 3.38 1.128 1.128 1.128
VII PEKERJAAN BETON DAK ATAP 0.99 0.329 0.329 0.329
VIII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP 1.44 0.479 0.479 0.479 0.479
B PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI Dasar
II PEKERJAAN LANTAI 1 5.12 0.640 0.640 0.640 0.640 0.640 0.640 0.640 0.640
III PEKERJAAN LANTAI 2
IV PEKERJAAN LANTAI DAK BETON
C PEKERJAAN M-E
I PEKERJAAN LANTAI BASEMENT
II PEKERJAAN LANTAI 1 2.36 0.591 0.591 0.591 0.591
III PEKERJAAN LANTAI 2
B PEKERJAAN M-E
I PEKERJAAN MEKANIKAL & ELEKTRIKAL SITE PLAN 2.09 0.348 0.348 0.348 0.348 0.348 0.348
II PEKERJAAN MEKANIKAL & ELEKTRIKAL R. POMPA 0.61 0.614
III PEKERJAAN MEKANIKAL & ELEKTRIKAL R. PANEL 1.63 0.327 0.327 0.327 0.327 0.327
PROGRESS RENCANA MINGGUAN 0.435 0.435 1.159 2.799 3.490 5.694 5.308 5.491 7.932 7.680 8.367 9.482 8.223 8.702 8.958 7.207 5.996 3.121
PROGRESS RENCANA KOMULATIF 0.435 0.869 2.029 4.828 8.318 14.012 19.320 24.811 32.743 40.423 48.790 58.273 66.495 75.197 84.156 91.363 97.358 100
TS Page 191
KEGIATAN
REVITALISASI PASAR LELES (PAJAK ROKOK)
PEKERJAAN SCHEDULE BAHAN/MATERIAL
REVITALISASI PASAR RAKYAT LELES (LANJUTAN)
2 B. BAHAN FINISHING
4 D. BAHAN PLAFOND
6 F. BAHAN KACA
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
Bulan Pelaksanaan
1 2 3 4 5
No. Uraian Pendidikan
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 119-120
Pekerja 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Tukang 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Kepala Tukang 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Mandor 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
NILAI KONTRAK ( Rp )
Uraian Pekerjaan TOTAL % KDN TKDN GABUNGAN
DN LN Rp % KDN Rp %
Barang Barang
I Material Langsung ( Bahan baku ) Err:509 0 Err:509 50.00
II Peralatan ( barang Jadi ) Err:509 0 Err:509 10.00
Err:509 Err:509
% TKDN = + Err:509 %
Err:509 Err:509
= 60% + 40%
I . BANGUNAN UTAMA
A PEKERJAAN PERSIAPAN
Pek. Pengukuran 1.00 Ls
Tenaga Kerja : Koef Volume Jumlah Durasi Jumlah org/hari
Logistik 1.000 x 150.00 = 150.00 hok 150 hari = 1.00 oh
Pelaksana 1.000 x 150.00 = 150.00 hok 150 hari = 1.00 oh
Site manager 1.000 x 150.00 = 150.00 hok 150 hari = 1.00 oh
● Rencana Waktu Penyelesaian Minggu ke - 1 gan minggu ke - 18
I Persiapan K3
1 Penyiapan RK3K terdiri atas : Pembuatan Manual, Prosedur, Instruksi Kerja 1 set
2 Pembuatan Kartu Identitas Pekerja (KIP) 180 org
Cor Beton Plat Tangga + Bordes, K-250 dan Perbaikan Bekisting existing 18.00 m3
Beton Mutu K-250 18.000 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 18.00 = 18.00
Alat bantu 1.000 m3 18.00 = 18.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
Rencana Waktu Pelaksanaan : Minggu ke 4 s/d minggu ke 4
Cor Beton Plat Tangga Darurat+ Bordes, K-250 dan Perbaikan Bekisting existing 8.64 m1
Beton Mutu K-250 8.640 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 8.64 = 8.64
Alat bantu 1.000 m3 8.64 = 8.64
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
Rencana Waktu Pelaksanaan : Minggu ke 4 s/d minggu ke 4
Cor Beton Kolom Struktur K1 45/45, K-300 Perbaikan Bekisting existing 14.58 m3
Beton Mutu K-300 14.580 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.300 1.000 m3 14.58 = 14.58
Alat bantu 1.000 m3 14.58 = 14.58
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = 1.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 9
Cor Beton Kolom Struktur K2 35/45, K-300 Perbaikan Bekisting existing 11.78 m3
Beton Mutu K-300 11.780 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.300 1.000 m3 11.78 = 11.78
Alat bantu 1.000 m3 11.78 = 11.78
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = 1.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 9
Cor Beton Plat Dak Atap t= 15 cm, K-250 Landasan Tangki Air Pek dan Perbaikan Bekisting existing 10.8 m3
Beton Mutu K-250 27.000 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 27.00 = 27.00
Alat bantu 1.000 m3 27.00 = 27.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11
Cor Beton Balok Struktur B1a 30/60, K-250 dan Perbaikan Bekisting existing 62.21 m3
Beton Mutu K - 250 62.210 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 62.21 = 62.21
Alat bantu 1.000 m3 62.21 = 62.21
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11
Cor Beton Balok Struktur B1b 30/60 , K-250 dan Perbaikan Bekisting existing 4.58 m3
Beton Mutu K - 250 4.580 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 4.58 = 4.58
Alat bantu 1.000 m3 4.58 = 4.58
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11
Cor Beton Balok Struktur B2 25/45, K-250 dan Perbaikan Bekisting existing 11.88 m3
Beton Mutu K - 250 11.880 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 11.88 = 11.88
Alat bantu 1.000 m3 11.88 = 11.88
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11
Cor Beton Balok Struktur B3 25/45, K-250 dan Perbaikan Bekisting existing 16.9 m3
Beton Mutu K - 250 16.900 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 16.90 = 16.90
Alat bantu 1.000 m3 16.90 = 16.90
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11
Pengadaan dan Pemasangan Ikatan Angin Kuda kuda / Besi D 16 mm Ulir 1485.2 kg
Bahan : Volume Jumlah
Besi Beton Polos 1.15 Kg 1485.20 = 1,707.98 Kg
Kawat las listrik 0.04 kg 1485.20 = 59.41 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.06 OH 1485.20 = 89.11 OH 1 hari = 89.11 oh
Tukang las konstruksi 0.06 OH 1485.20 = 89.11 OH 1 hari = 89.11 oh
Kepala Tukang 0.006 OH 1485.20 = 8.91 OH 1 hari = 8.91 oh
Mandor 0.003 OH 1485.20 = 4.46 OH 1 hari = 4.46 oh
Pengadaan dan Pemasangan Penutup Atap Bitumaen (Reff Produk Onduline) 2119.16 m2
Bahan : Koef. Volume Jumlah
Atap Bitumen Bergelombang Monolayer 3 mm 0.650 Lbr 2119.16 = 1,377.45 Kg
Paku atau Sekrup 9.100 bh 2119.16 = 19,284.36 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.140 OH 2119.16 = 296.68 OH 14 hari = 21.19 oh
Tukang 0.070 OH 2119.16 = 148.34 OH 14 hari = 10.60 oh
Kepala tukang 0.007 OH 2119.16 = 14.83 OH 14 hari = 1.06 oh
Mandor 0.007 OH 2119.16 = 14.83 OH 14 hari = 1.06 oh
Pengadaan dan Pemasangan Pasang Nok Bitumen ( reff Produk Onduline ) 62 m'
Bahan : Koef. Volume Jumlah
Nok 1.000 Lbr 62.00 = 62.00 Kg
assesoris 1.000 bh 62.00 = 62.00 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja - OH 62.00 = - OH 7 hari = - oh
Tukang 0.200 OH 62.00 = 12.40 OH 7 hari = 1.77 oh
Kepala tukang - OH 62.00 = - OH 7 hari = - oh
Mandor - OH 62.00 = - OH 7 hari = - oh
Pengadaan dan Pemasangan Pas Pipa Rangka Atap Solar Flate Ø 2 " 21 m1
Bahan : Koef. Volume Jumlah
Besi Pipa 2" 2.72 kg 21.00 = 57.12 kg
Plat 10x10 mm 0.28 Kg 21.00 = 5.88 Kg
Asesoris 1 ls 21.00 = 21.00 ls
Finishing Cat Besi 1.1 m2 21.00 = 23.10 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang Pabrikasi Railling Tangga 1.000 Ls 21.00 = 21.00 OH 7 hari = 3.00 oh
Pengadaan dan Pemasangan Pas Pipa Tiang Atap Solar Flate Ø 6 " 37.5 m1
Bahan : Koef. Volume Jumlah
Besi Pipa 6" 1.1 m' 37.50 = 41.25 kg
Asesoris 1 ls 37.50 = 37.50 ls
Finishing Cat Besi 0.05 m2 37.50 = 1.88 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang Pabrikasi Railling Tangga 1.000 Ls 37.50 = 37.50 OH 7 hari = 5.36 oh
D PEKERJAAN ARSITEKTUR
II PEKERJAAN LANTAI 1
PEKERJAAN DINDING, PLESTERAN, ACIAN
Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 3,732.56 m2
Bahan : Koef. Volume Jumlah
Bata merah 70 buah 3732.56 = 261,279.20 kg
Portland Cement 9.68 Kg 3732.56 = 36,131.18 ls
Pasir Pasang 0.045 m3 3732.56 = 167.97 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.300 OH 3732.56 = 1,119.77 OH 28 hari = 39.99 oh
Tukang batu 0.100 OH 3732.56 = 373.26 OH 28 hari = 13.33 oh
Kepala Tukang 0.010 OH 3732.56 = 37.33 OH 28 hari = 1.33 oh
Mandor 0.015 OH 3732.56 = 55.99 OH 28 hari = 2.00 oh
PEKERJAAN LANTAI
PEKERJAAN CAT
PEKERJAAN SANITAIR
PEKERJAAN LAIN-LAIN
Pek. Railing Besi Hollow + Handrailing Pipa Besi Ø 2" Fin. Cat (Tangga Darurat ) 30 m1
Bahan : Koef. Volume Jumlah
Besi hollow 20x60x1,4 mm 1.920 kg 30.00 = 57.60 kg
Besi hollow 20x40x1,4 mm 4.800 Kg 30.00 = 144.00 Kg
Plat 10x10 mm 0.560 Kg 30.00 = 16.80 Kg
Handrail Pipa Besi Ø 2" 4.110 Kg 30.00 = 123.30 Kg
Finishing Cat Besi 1.100 m2 30.00 = 33.00 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang Pabrikasi Railling Tangga 1.000 Ls 30.00 = 30.00 OH 30 hari = 1.00 Ls
PEKERJAAN LANTAI 2
PEKERJAAN CAT
PEKERJAAN LANTAI
Pek. Keramik Lantai uk. 40x40 2230.24 m2
Bahan : Koef. Volume Jumlah
Keramik 40 x 40 cm 1.000 M2 2230.24 = 2,230.24 M2
Semen portland 11.380 Kg 2230.24 = 25,380.13 Kg
Pasir pasang 0.042 M3 2230.24 = 93.67 M3
Semen warna 1.500 Kg 2230.24 = 3,345.36 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.620 oh 2230.24 = 1,382.75 OH 28 hari = 49.38 oh
Tukang 0.350 oh 2230.24 = 780.58 OH 28 hari = 27.88 oh
Kepala Tukang 0.035 oh 2230.24 = 78.06 OH 28 hari = 2.79 oh
Mandor 0.030 oh 2230.24 = 66.91 OH 28 hari = 2.39 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 14
PEKERJAAN PLAFOND
PEKERJAAN SANITAIR
PEKERJAAN LAIN-LAIN
Pek. Railing Besi Hollow + Handrailing Pipa Besi Ø 2" Fin. Cat (Tangga Darurat ) 30 m1
Bahan : Koef. Volume Jumlah
Besi hollow 20x60x1,4 mm 1.920 kg 30.00 = 57.60 kg
Besi hollow 20x40x1,4 mm 4.800 Kg 30.00 = 144.00 Kg
Plat 10x10 mm 0.560 Kg 30.00 = 16.80 Kg
Handrail Pipa Besi Ø 2" 4.110 Kg 30.00 = 123.30 Kg
Finishing Cat Besi 1.100 m2 30.00 = 33.00 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang Pabrikasi Railling Tangga 1.000 Ls 30.00 = 30.00 OH 30 hari = 1.00 Ls
PEKERJAAN LAIN-LAIN
Pek. Pas. Huruf 3D Plat t= 0,8mm finishing Duco uk. 80x65x6 cm bertuliskan : 10 bh
Bahan : Koef. Volume Jumlah
Huruf Plat Eisser t=0,8mm uk. 40x20x4 cm 80.000 cm 10.00 = 800.00 cm
Cat Duco 0.640 m2 10.00 = 6.40 m2
Besi hollow 20x60x1,4 mm 2.080 kg 10.00 = 20.80 kg
Besi hollow 20x40x1,4 mm 3.570 Kg 10.00 = 35.70 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 10.00 = 10.00 Ls 10 hari = 1.00 oh
Alat Bantu 1.000 Ls 10.00 = 10.00 Ls 10 hari = 1.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16
PASAR LELES
Pek Pas Ornamen Batik Cnc Plat Tbl 2 mm + finishing Cat Besi 58.28 m2 (TAHAP BERIKUTNYA)
II . BANGUNAN SAMPING
A PEKERJAAN STRUKTUR DAN ATAP
I PEKERJAAN PERSIAPAN
Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 7.26 m3
Beton Mutu K-250 7.26 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 7.26 = 7.26
Alat bantu 1.000 m3 7.26 = 7.26
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 8
Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 9.45 m3
Beton Mutu K-250 9.45 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 9.45 = 9.45
Alat bantu 1.000 m3 9.45 = 9.45
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 8
Pek. Beton Plat Tangga + Bordes dan Perbaikan Bekisting existing 2.44 m³
Beton Mutu K-250 2.440 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 2.44 = 2.44
Alat bantu 1.000 m3 2.44 = 2.44
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 8
Pek. Beton Plat Tangga + Bordes, K-250 dan Perbaikan Bekisting existing 1 unit
Beton Mutu K-250 1.000 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 1.00 = 1.00
Alat bantu 1.000 m3 1.00 = 1.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9
Cor Beton Kolom Struktur K1 45/45, K-300 dan Perbaikan Bekisting existing 15.39 m3
Beton Mutu K-300 1.00 m3
Beton Mutu K-300 1.00 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 1.00 = 1.00
Alat bantu 1.000 m3 1.00 = 1.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11
Cor Beton Balok Struktur B1a 30/60, K-250 Bekisting existing 15.2 m³
Beton Mutu K - 250 15.200 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 15.20 = 15.20
Alat bantu 1.000 m3 15.20 = 15.20
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12
Cor Beton Balok Struktur B1b 30/60 , K-250 Bekisting existing 11.2 m³
Beton Mutu K - 250 11.200 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 11.20 = 11.20
Alat bantu 1.000 m3 11.20 = 11.20
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12
Cor Beton Balok Struktur B1a 30/60 , K-250 Bekisting existing 0.79 m³
Beton Mutu K - 250 0.790 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 0.79 = 0.79
Alat bantu 1.000 m3 0.79 = 0.79
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12
B PEKERJAAN ARSITEKTUR
II PEKERJAAN LANTAI 1
PEKERJAAN CAT
PEKERJAAN LANTAI
PEKERJAAN PLAFOND
PEKERJAAN LAIN-LAIN
III. SITE
III PEKERJAAN SITE
A PEKERJAAN STRUKTUR DAN ARSITEKTUR
PEKERJAAN JALAN
1.000
Alat bantu m3 190.73 = 190.73
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 14
Lantai Kerja t=5 cm, K 175 63.58 m3
Bahan : Koef. Volume Jumlah
Portland Cement 210.000 Kg 63.58 = 13,351.80 Kg
Pasir Beton 0.300 m3 63.58 = 19.07 m3
KR maks. 30 mm 0.500 m3 63.58 = 31.79 m3
Air 215.000 Liter 63.58 = 13,669.70 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 1.650 oh 63.58 = 104.91 OH 3 hari = 34.97 oh
Tukang 0.275 oh 63.58 = 17.48 OH 3 hari = 5.83 oh
Kepala Tukang 0.028 oh 63.58 = 1.78 OH 3 hari = 0.59 oh
Mandor 0.083 oh 63.58 = 5.28 OH 3 hari = 1.76 oh
● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13
II PEKERJAAN PAGAR
0.007
Kayu Papan 3/20 cm Klas II/Klas III M3 12.00 = 0.08 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
0.100 oh
Pekerja 12.00 = 1.20 OH 21 hari = 0.06 oh
Tukang 0.100 oh 12.00 = 1.20 OH 21 hari = 0.06 oh
0.010 oh
Kepala Tukang 12.00 = 0.12 OH 21 hari = 0.01 oh
Mandor 0.005 oh 12.00 = 0.06 OH 21 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 18
Pek. Urugan Pasir Urug Bawah Pondasi Batu Belah Menerus t=10cm 0.72 m3
Bahan : Koef. Volume Jumlah
Pasir Urug 1.200 M3 0.72 = 0.86 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.300 oh 0.72 = 0.22 OH 1 hari = 0.22 oh
Mandor 0.010 oh 0.72 = 0.01 OH 1 hari = 0.01 oh
Pek. Urugan Pasir Urug Bawah Pondasi Batu Belah Setempat t=10cm 0.14 m3
Bahan : Koef. Volume Jumlah
Pasir Urug 1.200 M3 0.14 = 0.17 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.300 oh 0.14 = 0.04 OH 1 hari = 0.04 oh
Mandor 0.010 oh 0.14 = 0.00 OH 1 hari = 0.00 oh
IV PEKERJAAN BETON
Pek. Pas. Kusen & Pintu Besi (Lkp engsel,kunci dan assr) 1 Unit
Bahan : Koef. Volume Jumlah
Kusen dan Pintu Besi 1.000 unit 1.00 = 1.00 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.400 OH 1.00 = 0.40 OH 1 hari = 0.40 oh
Tukang 1.200 OH 1.00 = 1.20 OH 1 hari = 1.20 oh
Kepala tukang OH 1.00 = - OH 1 hari = - oh
Mandor OH 1.00 = - OH 1 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 2 s/d minggu ke 2
I PEKERJAAN LANTAI I
PEKERJAAN PANEL
Panel PP - lantai 2 1.00 unit
Bahan : Koef. Volume Jumlah
MCB 200 A 3PH 1.000 bh 1.00 bh 1.00 bh
MCB 25 A 3 PH 1.000 bh 1.00 bh 1.00 bh
MCB 10 A 1 PH 1.000 bh 1.00 bh 1.00 bh
Pilot Lamp 1.000 set 1.00 set 1.00 set
Fuse Pilot Lamp 1.000 set 1.00 set 1.00 set
Wiring & Busbar 1.000 set 1.00 set 1.00 set
Panel Kosong uk. 70 x 90 x 30 cm 1.000 set 1.00 set 1.00 set
Ongkos Pasang & stel 1.000 lot 1.00 lot 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Tukang Listrik 1.000 oh 1.00 oh 1.00 oh 1.00 hari = 1.00 oh
Pekerja 1.000 oh 1.00 oh 1.00 oh 1.00 hari = 1.00 oh
Mandor 1.000 ih 1.00 ih 1.00 ih 1.00 hari = 1.00 oh
PEKERJAAN ELEKTRIKAL
TL LED 1x10 W (V-SHAPE) 147 unit
Bahan : Koef. Volume Jumlah
Lampu TL LED 10 watt 1.00 bh 147.00 m 147.00 bh
Armature Vshape 1.00 bh 147.00 bh 147.00 bh
accessories 1.00 lot 147.00 bh 147.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.046 OH 147.00 = 6.76 OH 7 hari = 0.97 oh
Tukang 0.023 OH 147.00 = 3.38 OH 7 hari = 0.48 oh
PEKERJAAN PLUMBING
Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 70.00 m
Bahan : Koef. Volume Jumlah
PVC dia. 1/2” 1.00 m 70.00 m 70.00 m
Hanger & Support 0.28 lot 70.00 bh 19.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 70.00 = 7.00 OH 1 hari = 7.00 oh
Tukang 0.100 OH 70.00 = 7.00 OH 1 hari = 7.00 oh
kepala tukang 0.010 OH 70.00 = 0.70 OH 1 hari = 0.70 oh
Mandor 0.005 OH 70.00 = 0.35 OH 1 hari = 0.35 oh
PVC ø 4 inc. 75 m
Bahan : Koef. Volume Jumlah
PVC dia. 4” 1.00 m 75.00 m 75.00 m
Hanger & Support 0.28 lot 75.00 bh 21.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 75.00 = 7.50 OH 4 hari = 1.88 oh
Tukang 0.100 OH 75.00 = 7.50 OH 4 hari = 1.88 oh
kepala tukang 0.010 OH 75.00 = 0.75 OH 4 hari = 0.19 oh
Mandor 0.005 OH 75.00 = 0.38 OH 4 hari = 0.09 oh
PVC ø 2 inc. 5 m
Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 5.00 m 5.00 m
Hanger & Support 0.28 lot 5.00 bh 1.40 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
Tukang 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
kepala tukang 0.010 OH 5.00 = 0.05 OH 1 hari = 0.05 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh
BSP ø 4 inc 5 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 4” 1.00 m3 5.00 m 5.00 m3
Support & Accesories 0.10 lot 5.00 bh 0.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 5.00 = 0.54 OH 1 hari = 0.54 oh
Tukang 0.180 OH 5.00 = 0.90 OH 1 hari = 0.90 oh
kepala tukang 0.018 OH 5.00 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh
BSP ø 2 inc 80 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2” 1.00 m3 80.00 m 80.00 m3
Support & Accesories 0.10 lot 80.00 bh 8.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 80.00 = 8.64 OH 1 hari = 8.64 oh
Tukang 0.180 OH 80.00 = 14.40 OH 1 hari = 14.40 oh
kepala tukang 0.018 OH 80.00 = 1.44 OH 1 hari = 1.44 oh
Mandor 0.005 OH 80.00 = 0.43 OH 1 hari = 0.43 oh
BSP ø 3 inc 25 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 3” 1.00 m3 25.00 m 25.00 m3
Support & Accesories 0.10 lot 25.00 bh 2.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 25.00 = 2.70 OH 1 hari = 2.70 oh
Tukang 0.180 OH 25.00 = 4.50 OH 1 hari = 4.50 oh
kepala tukang 0.018 OH 25.00 = 0.45 OH 1 hari = 0.45 oh
Mandor 0.005 OH 25.00 = 0.14 OH 1 hari = 0.14 oh
BSP ø 4 inc 35 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 4” 1.00 m3 35.00 m 35.00 m3
Support & Accesories 0.10 lot 35.00 bh 3.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 35.00 = 3.78 OH 1 hari = 3.78 oh
Tukang 0.180 OH 35.00 = 6.30 OH 1 hari = 6.30 oh
kepala tukang 0.018 OH 35.00 = 0.63 OH 1 hari = 0.63 oh
Mandor 0.005 OH 35.00 = 0.19 OH 1 hari = 0.19 oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12
BSP ø 6 inc 10 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 6” 1.00 m3 10.00 m 10.00 m3
Support & Accesories 0.10 lot 10.00 bh 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 10.00 = 1.08 OH 1 hari = 1.08 oh
Tukang 0.180 OH 10.00 = 1.80 OH 1 hari = 1.80 oh
kepala tukang 0.018 OH 10.00 = 0.18 OH 1 hari = 0.18 oh
Mandor 0.005 OH 10.00 = 0.05 OH 1 hari = 0.05 oh
I PEKERJAAN LANTAI II
PEKERJAAN PANEL
Panel PP - lantai 3 1 unit
Bahan : Koef. Volume Jumlah
MCB 200 A 3PH 1.000 bh 1.00 bh 1.00 bh
MCB 25 A 3 PH 1.000 bh 1.00 bh 1.00 bh
MCB 10 A 1 PH 1.000 bh 1.00 bh 1.00 bh
Pilot Lamp 1.000 set 1.00 set 1.00 set
Fuse Pilot Lamp 1.000 set 1.00 set 1.00 set
Wiring & Busbar 1.000 set 1.00 set 1.00 set
Panel Kosong uk. 70 x 90 x 30 cm 1.000 set 1.00 set 1.00 set
Ongkos Pasang & stel 1.000 lot 1.00 lot 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Tukang Listrik 1.000 oh 1.00 oh 1.00 oh 1.00 hari = 1.00 oh
Pekerja 1.000 oh 1.00 oh 1.00 oh 1.00 hari = 1.00 oh
Mandor 1.000 ih 1.00 ih 1.00 ih 1.00 hari = 1.00 oh
PEKERJAAN ELEKTRIKAL
TL LED 1x10 W (V-SHAPE) 132 unit
Bahan : Koef. Volume Jumlah
Lampu TL LED 10 watt 1.00 bh 132.00 m 132.00 bh
Armature Vshape 1.00 bh 132.00 bh 132.00 bh
accessories 1.00 lot 132.00 bh 132.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.046 OH 132.00 = 6.07 OH 2 hari = 3.04 oh
Tukang 0.023 OH 132.00 = 3.04 OH 2 hari = 1.52 oh
PEKERJAAN PLUMBING
Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 70 m
Bahan : Koef. Volume Jumlah
PVC dia. 1/2” 1.00 m 70.00 = 70.00 m
Hanger & Support 0.28 lot 70.00 = 19.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 70.00 = 7.00 OH 7 hari = 1.00 oh
Tukang 0.100 OH 70.00 = 7.00 OH 7 hari = 1.00 oh
kepala tukang 0.010 OH 70.00 = 0.70 OH 7 hari = 0.10 oh
Mandor 0.005 OH 70.00 = 0.35 OH 7 hari = 0.05 oh
PVC ø 1 inc. 75 m
Bahan : Koef. Volume Jumlah
PVC dia. 1” 1.00 m 75.00 = 75.00 m
Hanger & Support 0.28 lot 75.00 = 21.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 75.00 = 7.50 OH 7 hari = 1.07 oh
Tukang 0.100 OH 75.00 = 7.50 OH 7 hari = 1.07 oh
kepala tukang 0.010 OH 75.00 = 0.75 OH 7 hari = 0.11 oh
Mandor 0.005 OH 75.00 = 0.38 OH 1 hari = 0.38 oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12
PVC ø 2 inc. 35 m
Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 35.00 = 35.00 m
Hanger & Support 0.28 lot 35.00 = 9.80 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 35.00 = 3.50 OH 1 hari = 3.50 oh
Tukang 0.100 OH 35.00 = 3.50 OH 1 hari = 3.50 oh
kepala tukang 0.010 OH 35.00 = 0.35 OH 1 hari = 0.35 oh
Mandor 0.005 OH 35.00 = 0.18 OH 1 hari = 0.18 oh
PVC ø 4 inc. 75 m
Bahan : Koef. Volume Jumlah
PVC dia. 4” 1.00 m 75.00 = 75.00 m
Hanger & Support 0.28 lot 75.00 = 21.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 75.00 = 7.50 OH 1 hari = 7.50 oh
Tukang 0.100 OH 75.00 = 7.50 OH 1 hari = 7.50 oh
kepala tukang 0.010 OH 75.00 = 0.75 OH 1 hari = 0.75 oh
Mandor 0.005 OH 75.00 = 0.38 OH 1 hari = 0.38 oh
PVC ø 2 inc. 5 m
Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 5.00 = 5.00 m
Hanger & Support 0.28 lot 5.00 = 1.40 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
Tukang 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
kepala tukang 0.010 OH 5.00 = 0.05 OH 1 hari = 0.05 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh
BSP ø 4 inc 5 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 4” 1.00 m3 5.00 = 5.00 m3
Support & Accesories 0.10 lot 5.00 = 0.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 5.00 = 0.54 OH 1 hari = 0.54 oh
Tukang 0.180 OH 5.00 = 0.90 OH 1 hari = 0.90 oh
kepala tukang 0.018 OH 5.00 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh
BSP ø 2 inc 65 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2” 1.00 m3 65.00 = 65.00 m3
Support & Accesories 0.10 lot 65.00 = 6.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 65.00 = 7.02 OH 1 hari = 7.02 oh
Tukang 0.180 OH 65.00 = 11.70 OH 1 hari = 11.70 oh
kepala tukang 0.018 OH 65.00 = 1.17 OH 1 hari = 1.17 oh
Mandor 0.005 OH 65.00 = 0.35 OH 1 hari = 0.35 oh
BSP ø 3 inc 35 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 3” 1.00 m3 35.00 = 35.00 m3
Support & Accesories 0.10 lot 35.00 = 3.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 35.00 = 3.78 OH 1 hari = 3.78 oh
Tukang 0.180 OH 35.00 = 6.30 OH 1 hari = 6.30 oh
kepala tukang 0.018 OH 35.00 = 0.63 OH 1 hari = 0.63 oh
Mandor 0.005 OH 35.00 = 0.19 OH 1 hari = 0.19 oh
BSP ø 4 inc 20 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 4” 1.00 m3 20.00 = 20.00 m3
Support & Accesories 0.10 lot 20.00 = 2.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 20.00 = 2.16 OH 1 hari = 2.16 oh
Tukang 0.180 OH 20.00 = 3.60 OH 1 hari = 3.60 oh
kepala tukang 0.018 OH 20.00 = 0.36 OH 1 hari = 0.36 oh
Mandor 0.005 OH 20.00 = 0.11 OH 1 hari = 0.11 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14
BSP ø 6 inc 10 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 6” 1.00 m3 10.00 = 10.00 m3
Support & Accesories 0.10 lot 10.00 = 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 10.00 = 1.08 OH 1 hari = 1.08 oh
Tukang 0.180 OH 10.00 = 1.80 OH 1 hari = 1.80 oh
kepala tukang 0.018 OH 10.00 = 0.18 OH 1 hari = 0.18 oh
Mandor 0.005 OH 10.00 = 0.05 OH 1 hari = 0.05 oh
PEKERJAAN PLUMBING
Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1 inc. 5 m
Bahan : Koef. Volume Jumlah
PVC dia. 1” 1.00 m 5.00 = 5.00 m
Hanger & Support 0.28 lot 5.00 = 1.40 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
Tukang 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
kepala tukang 0.010 OH 5.00 = 0.05 OH 1 hari = 0.05 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh
PVC ø 2 inc. 20 m
Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 20.00 = 20.00 m
Hanger & Support 0.28 lot 20.00 = 5.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
Tukang 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.010 OH 20.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.005 OH 20.00 = 0.10 OH 1 hari = 0.10 oh
PVC ø 4 inc. 50 m
Bahan : Koef. Volume Jumlah
PVC dia. 4” 1.00 m 50.00 = 50.00 m
Hanger & Support 0.28 lot 50.00 = 14.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 50.00 = 5.00 OH 1 hari = 5.00 oh
Tukang 0.100 OH 50.00 = 5.00 OH 1 hari = 5.00 oh
kepala tukang 0.010 OH 50.00 = 0.50 OH 1 hari = 0.50 oh
Mandor 0.005 OH 50.00 = 0.25 OH 1 hari = 0.25 oh
PVC ø 6 inc. 30 m
Bahan : Koef. Volume Jumlah
PVC dia. 6” 1.00 m 30.00 = 30.00 m
Hanger & Support 0.28 lot 30.00 = 8.40 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 30.00 = 3.00 OH 1 hari = 3.00 oh
Tukang 0.100 OH 30.00 = 3.00 OH 1 hari = 3.00 oh
kepala tukang 0.010 OH 30.00 = 0.30 OH 1 hari = 0.30 oh
Mandor 0.005 OH 30.00 = 0.15 OH 1 hari = 0.15 oh
BANGUNAN SAMPING
I LANTAI I
PEKERJAAN PANEL
Panel PP - lantai 2 (Penunjang) 1 unit
Bahan : Koef. Volume Jumlah
MCB 63 A 3PH 1.00 bh 1.00 = 1.00 bh
MCB 16 A 3 PH 2.00 bh 1.00 = 1.00 bh
MCB 10 A 1 PH 3.00 bh 1.00 = 1.00 bh
Pilot Lamp 3.00 set 1.00 = 1.00 set
Fuse Pilot Lamp 3.00 set 1.00 = 1.00 set
Wiring & Busbar 1.00 set 1.00 = 1.00 set
Panel Kosong uk. 70 x 90 x 30 cm 1.00 set 1.00 = 1.00 set
Ongkos Pasang & stel 1.00 lot 1.00 = 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
JASA PASANG 1.000 LS 1.00 = 1.00 OH 1 hari = 0.10 oh
PEKERJAAN ELEKTRIKAL
TL LED 1x10 W (V-SHAPE) 33 unit
Bahan : Koef. Volume Jumlah
Lampu TL LED 10 watt 1.00 bh 33.00 m 33.00 bh
Armature Vshape 1.00 bh 33.00 bh 33.00 bh
accessories 1.00 lot 33.00 bh 33.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.046 OH 33.00 = 1.52 OH 2 hari = 0.76 oh
Tukang 0.023 OH 33.00 = 0.76 OH 2 hari = 0.38 oh
PEKERJAAN PLUMBING
Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 10 m
PVC ø 1/2 inc. 70.00 m
Bahan : Koef. Volume Jumlah
PVC dia. 1/2” 1.00 m 70.00 m 70.00 m
Hanger & Support 0.28 lot 70.00 bh 19.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 70.00 = 7.00 OH 1 hari = 7.00 oh
Tukang 0.100 OH 70.00 = 7.00 OH 1 hari = 7.00 oh
kepala tukang 0.010 OH 70.00 = 0.70 OH 1 hari = 0.70 oh
Mandor 0.005 OH 70.00 = 0.35 OH 1 hari = 0.35 oh
PVC ø 1 inc. 45 m
Bahan : Koef. Volume Jumlah
PVC dia. 1” 1.00 m 45.00 m 45.00 m
Hanger & Support 0.28 lot 45.00 bh 12.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 45.00 = 4.50 OH 1 hari = 4.50 oh
Tukang 0.100 OH 45.00 = 4.50 OH 1 hari = 4.50 oh
kepala tukang 0.010 OH 45.00 = 0.45 OH 1 hari = 0.45 oh
Mandor 0.005 OH 45.00 = 0.23 OH 1 hari = 0.23 oh
PVC ø 3 inc. 17 m
Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 17.00 m 17.00 m
Hanger & Support 0.28 lot 17.00 bh 4.76 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 17.00 = 1.70 OH 1 hari = 1.70 oh
Tukang 0.100 OH 17.00 = 1.70 OH 1 hari = 1.70 oh
kepala tukang 0.010 OH 17.00 = 0.17 OH 1 hari = 0.17 oh
Mandor 0.005 OH 17.00 = 0.09 OH 1 hari = 0.09 oh
PVC ø 4 inc. 20 m
Bahan : Koef. Volume Jumlah
PVC dia. 4” 1.00 m 20.00 m 20.00 m
Hanger & Support 0.28 lot 20.00 bh 5.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
Tukang 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.010 OH 20.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.005 OH 20.00 = 0.10 OH 1 hari = 0.10 oh
BSP ø 2 inc 10 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2” 1.00 m3 10.00 m 10.00 m3
Support & Accesories 0.10 lot 10.00 bh 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 10.00 = 1.08 OH 1 hari = 1.08 oh
Tukang 0.180 OH 10.00 = 1.80 OH 1 hari = 1.80 oh
kepala tukang 0.018 OH 10.00 = 0.18 OH 1 hari = 0.18 oh
Mandor 0.005 OH 10.00 = 0.05 OH 1 hari = 0.05 oh
Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 1 bh
Bahan : Koef. Volume Jumlah
Manual push button 1.00 bh 1.00 m 1.00 bh
Alarm bell 1.00 bh 1.00 m 1.00 bh
Indicator lamp 1.00 bh 1.00 m 1.00 bh
Peralatan Bantu 1.00 lot 1.00 m 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.090 OH 1.00 = 0.09 OH 1 hari = 0.09 oh
Tukang 0.125 OH 1.00 = 0.13 OH 1 hari = 0.13 oh
kepala tukang 0.013 OH 1.00 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.004 OH 1.00 = 0.00 OH 1 hari = 0.00 oh
Intalasi Push button, Alarm bell, Indicator lamp & Fighting Tlp. 1 ttk
Bahan : Koef. Volume Jumlah
NYA 1,5 mm2 48.00 m 1.00 m 48.00 m
Pipa High Impact, dia. 1/2" 4.00 m 1.00 m 4.00 m
Peralatan Bantu 1.00 lot 1.00 m 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 1.00 = 0.25 OH 1 hari = 0.25 oh
Tukang 0.550 OH 1.00 = 0.55 OH 1 hari = 0.55 oh
kepala tukang 0.055 OH 1.00 = 0.06 OH 1 hari = 0.06 oh
Mandor 0.018 OH 1.00 = 0.02 OH 1 hari = 0.02 oh
TB - FA. 10 pairs 1 bh
Bahan : Koef. Volume Jumlah
TBFA 1.00 bh 1.00 m 1.00 bh
Peralatan Bantu 1.00 lot 1.00 m 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 1.00 = 0.25 OH 1 hari = 0.25 oh
Tukang 0.350 OH 1.00 = 0.35 OH 1 hari = 0.35 oh
kepala tukang 0.035 OH 1.00 = 0.04 OH 1 hari = 0.04 oh
Mandor 0.012 OH 1.00 = 0.01 OH 1 hari = 0.01 oh
III. SITE
PP - OD 1 set
Bahan : Koef. Volume Jumlah
MCB 16 A 3PH 1.00 bh 1.00 m 1.00 bh
MCB 10 A 1 PH 3.00 bh 1.00 m 3.00 bh
MCB 2 A 1 PH 12.00 bh 1.00 m 12.00 bh
Pilot Lamp 3.00 bh 1.00 m 3.00 bh
Fuse Pilot Lamp 3.00 bh 1.00 m 3.00 bh
Wiring & Busbar 1.00 bh 1.00 m 1.00 bh
Panel Kosong uk. 70 x 90 x 30 cm 1.00 bh 1.00 m 1.00 bh
Ongkos Pasang & stel 1.00 bh 1.00 m 1.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
PAKET PASANG 1.000 LS 1.00 = 1.00 LS 1 hari = 1.00 oh
PEKERJAAN PLUMBING
Pompa Deep Well 1 unit TAHAP BERIKUTNYA
Pompa Deep Well include panel, cable & accessories
Type : Submersible
Capacity : 200 liter/menit
Head : 150 m
Resapan 15 unit
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pasang 1.000 ls 15.00 = 1.00 ls 1 hari = 1.00 oh
BSP ø 6 inc 50 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 6” 1.00 m3 50.00 m 50.00 m3
Support & Accesories 0.10 lot 50.00 bh 5.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 50.00 = 5.40 OH 1 hari = 5.40 oh
Tukang 0.180 OH 50.00 = 9.00 OH 1 hari = 9.00 oh
kepala tukang 0.018 OH 50.00 = 0.90 OH 1 hari = 0.90 oh
Mandor 0.005 OH 50.00 = 0.27 OH 1 hari = 0.27 oh
Valve Class 20 kg
Gate Valve ø 4 inc 6 unit
Bahan : Koef. Volume Jumlah
Gate Valve dia. 4 inc 1.00 bh 6.00 m 6.00 bh
Hanger & Support 0.28 lot 6.00 bh 1.68 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 6.00 = 0.60 OH 1 hari = 0.60 oh
Tukang 0.100 OH 6.00 = 0.60 OH 1 hari = 0.60 oh
kepala tukang 0.010 OH 6.00 = 0.06 OH 1 hari = 0.06 oh
Mandor 0.005 OH 6.00 = 0.03 OH 1 hari = 0.03 oh
PEKERJAAN PLUMBING
Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 2 inc. 50 m
Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 50.00 = 50.00 m
Hanger & Support 0.28 lot 50.00 = 14.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 50.00 = 5.00 OH 1 hari = 5.00 oh
Tukang 0.100 OH 50.00 = 5.00 OH 1 hari = 5.00 oh
kepala tukang 0.010 OH 50.00 = 0.50 OH 1 hari = 0.50 oh
Mandor 0.005 OH 50.00 = 0.25 OH 1 hari = 0.25 oh
Diesel Pump incl. panel, tangki bahan bakar & accessories 1 unit BY OWNEER
Tipe : Vertical Turbine
Kapasitas : 750 GPM
Total Head : 100 m
Accessories
Strainer ø 6 inc 2 unit TAHAP BERIKUTNYA
Automatic Air Release valve 1 unit TAHAP BERIKUTNYA
Pressure gauge 3 unit TAHAP BERIKUTNYA
Safety valve 1 unit TAHAP BERIKUTNYA
LVMDP 1 set
Bahan : Koef. Volume Jumlah
MCCB 200 A 3PH 2.00 KVa 1.00 m 2.00 KVa
Interlock System 1.00 KVa 1.00 m 1.00 KVa
MCCB 100 A 3PH 2.00 KVa 1.00 m 2.00 KVa
MCB 40 A 3 PH 3.00 KVa 1.00 m 3.00 KVa
MCB 25 A 3PH 1.00 KVa 1.00 m 1.00 KVa
MCB 16 A 3 PH 1.00 KVa 1.00 m 1.00 KVa
MCB 4 A 1PH 2.00 KVa 1.00 m 2.00 KVa
Digital Power Meter 2.00 KVa 1.00 m 2.00 KVa
Current Traffo 400/ 5A 6.00 KVa 1.00 m 6.00 KVa
Pilot Lamp 3.00 KVa 1.00 m 3.00 KVa
Fuse Pilot Lamp 3.00 KVa 1.00 m 3.00 KVa
Wiring & Busbar 1.00 KVa 1.00 m 1.00 KVa
Panel Kosong uk. 180 x 160 x 60 cm 1.00 KVa 1.00 m 1.00 KVa
Ongkos Pasang & stel 1.00 KVa 1.00 m 1.00 KVa
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
paket pasang 1.000 ls 1.00 = 1.00 ls 1 hari = 1.00 oh
PEKERJAAN PLUMBING
Pipa air hujan (PVC class 10 kg/cm2, incl. accessories)
PVC ø 4 inc. 10 m
Bahan : Koef. Volume Jumlah
PVC dia. 4” 1.00 m 10.00 = 10.00 m
Hanger & Support 0.28 lot 10.00 = 2.80 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 10.00 = 1.00 OH 1 hari = 1.00 oh
Tukang 0.100 OH 10.00 = 1.00 OH 1 hari = 1.00 oh
kepala tukang 0.010 OH 10.00 = 0.10 OH 1 hari = 0.10 oh
Mandor 0.005 OH 10.00 = 0.05 OH 1 hari = 0.05 oh
Tidak mengandung bahan organik, lumpur dan sejenisnya Matrial Terdekat / GARUT
Agregat halus dan kasar dipakai agregat dari batuan alami yang memenuhi syarat Matrial Terdekat / GARUT
menurut PBI 1971 (NI-2)
Mempunyai rusuk-rusuk yang tajam dan siku, bidang-bidang sisinya harus datar, tidak
menunjukkan retak-retak pembakarannya harus merata dan matang Matrial Terdekat / GARUT
Agregat halus dan kasar dipakai agregat dari batuan alami yang memenuhi syarat Matrial Terdekat / GARUT
menurut PBI 1971 (NI-2)
Menggunakan agregat halus dan kasar sesuai standar PBI (NI-2), Menggunakan semen Matrial Terdekat / GARUT
Tipe 1 dan dilengkapai hasil uji agregat, mix desain dan uji kuat tekan beton
Bersih dan keras memiliki nilai CBR minimal 6% Matrial Terdekat / GARUT
Tipe I menurut Peraturan Semen Portland Indonesia 1972 (NI-8) Matrial Terdekat / GARUT
Berkualitas Baik sesuai dengan RKS dan RAB Matrial Terdekat / GARUT
Berkualitas Baik sesuai dengan RKS dan RAB Matrial Terdekat / GARUT
Berkualitas Baik sesuai dengan RKS dan RAB Matrial Terdekat / GARUT
Berkualitas Baik sesuai dengan RKS dan RAB Matrial Terdekat / GARUT
Berkualitas Baik sesuai dengan RKS dan RAB Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas dan bermutu Tinggi, Anti Korosi Matrial Terdekat / GARUT
Berkualitas dan bermutu Tinggi, Anti Korosi Matrial Terdekat / GARUT
Berkualitas dan bermutu Tinggi, Anti Korosi Matrial Terdekat / GARUT
Berkualitas dan bermutu Tinggi, Anti Korosi Matrial Terdekat / GARUT
Pekerjaan Railling Pagar Poid dan Terjatuh, tertimpa material, tergores alat Semua Personil Menggunakan peralatan K3
Tangga pemotong rangka Pipa railling, terpapar dan Pekerja Proyek Bekerja Hati-hati
percikan api potongan besi pipa realling (Yang ada di Lokasi membuat baner untuk
Pekerjaan) utamakan keselamatan K3
Pekerjaan Pemasangan Instalasi Terjatuh, Tersengat Aliran Listrik Semua Personil Menggunakan peralatan K3
Listrik dan Pekerja Proyek Bekerja Hati-hati
(Yang ada di Lokasi membuat baner untuk
Pekerjaan) utamakan keselamatan K3
Pekerjaan Pemasangan Rangka dindin Terjatuh, tertimpa material, terpapar Semua Personil Menggunakan peralatan K3
Partisi dan Penutup Partisi percikan api potongan besi rangka Beton, dan Pekerja Proyek Bekerja Hati-hati
terhirup aroma material pelapis dan (Yang ada di Lokasi membuat baner untuk
pereket (lem) Pekerjaan) utamakan keselamatan K3
Program Sumber Daya
(6)
Semua Perlengkapan K3
(termasuk alat dan bahan)
personil
Semua Perlengkapan K3
(termasuk alat dan bahan)
personil
Semua Perlengkapan K3
(termasuk alat dan bahan)
personil
Semua Perlengkapan K3
(termasuk alat dan bahan)
personil
Semua Perlengkapan K3
(termasuk alat dan bahan)
personil
Semua Perlengkapan K3
(termasuk alat dan bahan)
personil