Anda di halaman 1dari 307

DOKUMEN PENAWARAN

PT. RAYNA DOMINIQUE ZALIKA

KEGIATAN

REVITALISASI PASAR LELES (PAJAK ROKOK)

PEKERJAAN
REVITALISASI PASAR RAKYAT LELES (LANJUT

KABUPATEN GARUT

TAHUN ANGGARAN
2019
AWARAN
UE ZALIKA

(PAJAK ROKOK)

LELES (LANJUTAN)

ARUT

AN
PEMERINTAH KABUPATEN GARUT
DINAS PERINDUSTRIAN, PERDAGANGAN
ENERGI DAN SUMBER DAYA MINERAL

LAPORAN MINGGUAN
KE - 1 (SATU)
(Periode 10 September s/d 14 September 2019)

REVITALISASI PASAR RAKYAT LELES (LANJUTAN)


KABUPATEN GARUT

NOMOR KONTRAK : 027/996/SP-PPK/RPI-DisperindagESDM


TANGGAL KONTRAK : 10 September 2019

Kontraktor Pelaksana
PT. RAYNA DOMINIQUE ZALIKA
LAPORAN KEMAJUAN KEGIATAN MINGGU
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 September
REKAPITULASI BOBOT PEKERJAAN

PEKERJAAN : REVITALISASI PASAR RAKYAT LELES (LANJUTAN)


NOMOR KONTRAK : 027/996/SP-PPK/RPI-DisperindagESDM
TGL KONTRAK : Tanggal 10 September 2019
NILAI KONTRAK : Rp. 9.240.564.968,80 (termasuk PPN 10%)
KOTA KABUPATEN : GARUT
TAHUN ANGGARAN : 2019
PENYEDIA JASA PEMBORONGAN : PT. RAYNA DOMINIQUE ZALIKA
KONSULTAN PENGAWAS : CV. GRIYA LOKA

NO URAIAN PEKERJAAN

I PEKERJAAN BANGUNAN UTAMA


A PEKERJAAN PERSIAPAN

B PEKERJAAN PENYELENGGARAAN KEAMANAN DAN KESEHATAN


KERJA SERTA KESELAMATAN KONSTRUKSI

C PEKERJAAN STRUKTUR DAN ATAP


I PEKERJAAN GALIAN TANAH & URUGAN
II PEKERJAAN PONDASI
III PEKERJAAN BETON LANTAI BASEMENT / LANTAI DASAR
IV PEKERJAAN BETON LANTAI 1
V PEKERJAAN BETON LANTAI 2
VI PEKERJAAN BETON DAK ATAP
VII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP

D PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI BASEMENT / LANTAI DASAR
II PEKERJAAN LANTAI 1
III PEKERJAAN LANTAI 2
IV PEKERJAAN LANTAI DAK BETON

E PEKERJAAN MEKANIKAL & ELEKTRIKAL


I PEKERJAAN LANTAI BASEMENT
II PEKERJAAN LANTAI 1

4/307
NO URAIAN PEKERJAAN

III PEKERJAAN LANTAI 2


IV PEKERJAAN LANTAI DAK BETON

JUMLAH BANGU
II BANGUNAN SAMPING
A PEKERJAAN STRUKTUR DAN ATAP
I PEKERJAAN PERSIAPAN
II PEKERJAAN GALIAN TANAH & URUGAN
III PEKERJAAN PONDASI
IV PEKERJAAN BETON LANTAI DASAR
V PEKERJAAN BETON LANTAI 1
VI PEKERJAAN BETON LANTAI 2
VII PEKERJAAN BETON DAK ATAP
VIII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP

B PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI Dasar
II PEKERJAAN LANTAI 1
III PEKERJAAN LANTAI 2
IV PEKERJAAN LANTAI DAK BETON

C PEKERJAAN M-E
I PEKERJAAN LANTAI BASEMENT
II PEKERJAAN LANTAI 1
III PEKERJAAN LANTAI 2

JUMLAH BANGUN
III PEKERJAAN SITE
A PEKERJAAN STRUKTUR DAN ARSITEKTUR
I PEKERJAAN JALAN
II PEKERJAAN PAGAR
III PEKERJAAN SALURAN

B PEKERJAAN M-E
I PEKERJAAN MEKANIKAL & ELEKTRIKAL SITE PLAN
II PEKERJAAN MEKANIKAL & ELEKTRIKAL R. POMPA
III PEKERJAAN MEKANIKAL & ELEKTRIKAL R. PANEL

5/307
NO URAIAN PEKERJAAN

IV PEKERJAAN POS JAGA


PEKERJAAN POS JAGA

JUMLAH IV
V PEKERJAAN GROUNDTANK & RUMAH POMPA
I PEKERJAAN GROUNDTANK
II PEKERJAAN RUMAH POMPA

JUMLAH V
VI PEKERJAAN RUMAH PANEL
I PEKERJAAN RUMAH PANEL

JUMLAH VI

KOMULATIF KEMAJUAN PEKERJAAN MINGGU LALU


KEMAJUAN PEKERJAAN MINGGU INI
KOMULATIF KEMAJUAN PEKERJAAN S/D MINGGU INI
KOMULATIF RENCANA KEMAJUAN PEKERJAAN S/D MINGGU INI
DEVIASI KEMAJUAN PEKERJAAN (Cepat)

Diperiksa Oleh,
Konsultan Pengawas
CV. GRIYA LOKA

Ir. Mohamad Tahri


Team Leader

6/307
N KEGIATAN MINGGUAN
KE : I ( SATU)
r s/d 14 September 2019
BOBOT PEKERJAAN

JANGKA WAKTU PELAKSANAAN : 113 Hari Kalender


(10 SEPTEMBER 2019 s.d 7 JANUARI 2019)
WAKTU YANG DILALUI : 5 Hari Kalender
SISA WAKTU PELAKSANAAN : 108 Hari Kalender

BOBOT
BOBOT
PEKERJAAN MINGGU S/D
MINGGU INI MINGGU
LALU INI
(%) (%) (%) (%)

0.221 - 0.022 0.022

JUMLAH A 0.221 - 0.022 0.022

0.295 - 0.012 0.012

JUMLAH B 0.295 - 0.012 0.012

- -
- -
0.682 - - -
4.288 - - -
2.588 - - -
3.891 - - -
8.365 - - -

JUMLAH C 19.814 - - -

- -
19.855 - - -
16.166 - - -
2.209 - - -

JUMLAH D 38.229 - - -

- -
7.590 - - -

7/307
BOBOT
BOBOT
PEKERJAAN MINGGU S/D
MINGGU INI
LALU MINGGU INI
(%) (%) (%) (%)
7.254 - - -
1.015 - - -

JUMLAH E 15.858 - - -
JUMLAH BANGUNAN UTAMA 74.418 - 0.034 0.034

- -
- -
- -
0.306 - - -
0.554 - - -
3.413 - - -
0.997 - - -
1.450 - - -

JUMLAH A 6.720 - - -

- -
5.163 - - -
- -
- -

JUMLAH B 5.163 - - -

- -
2.293 - - -
- -

JUMLAH C 2.293 - - -
JUMLAH BANGUNAN SAMPING 14.175 - - -

- -
4.988 - - -
- -
1.776 - - -

JUMLAH A 6.763 - - -

2.037 - - -
0.600 - - -
1.593 - - -

JUMLAH B 4.229 - - -
JUMLAH III 10.993 - - -

8/307
BOBOT
BOBOT
PEKERJAAN MINGGU S/D
MINGGU INI
LALU MINGGU INI
(%) (%) (%) (%)

- -

- - - -

- -
- -

- - - -

0.414 - - -

0.414 - - -
100.000 - 0.034 0.034
-
0.034
0.034
0.027
Cepat) 0.007

Garut, 14 September 2019


Dibuat Oleh,
Kontraktor Pelaksana
PT. RAYNA DOMINIQUE ZALIKA

Bonaventura, ST
Project Manager

9/307
LAPORAN KEMAJUAN PEKERJAAN MING
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 Septemb
REKAPITULASI BOBOT PEKERJAAN

PEKERJAAN : REVITALISASI PASAR RAKYAT LELES (LANJUTAN)


NOMOR KONTRAK : 027/996/SP-PPK/RPI-DisperindagESDM
TGL KONTRAK : Tanggal 10 September 2019
NILAI KONTRAK : Rp. 9.240.564.968,80 (termasuk PPN 10%)
KOTA KABUPATEN : GARUT
TAHUN ANGGARAN : 2019
PENYEDIA JASA PEMBORONGAN : PT. RAYNA DOMINIQUE ZALIKA
KONSULTAN PENGAWAS : CV. GRIYA LOKA
SUB PEKERJAAN : BANGUNAN UTAMA

NO URAIAN PEKERJAAN VOLUME

I PEKERJAAN BANGUNAN UTAMA


A PEKERJAAN PERSIAPAN
1.1 Pek. Pengukuran 1.00
1.2 Mobilisasi & Demobilisasi 1.00
1.3 Pembersihan Lahan 1.00
SUB JUMLAH A
B PEKERJAAN PENYELENGGARAAN KEAMANAN DAN KESEHATAN KERJA SERTA KESELAMATAN KONSTRUKSI
I Persiapan K3
1 Penyiapan RK3K terdiri atas : Pembuatan Manual, Prosedur, Instruksi Kerja 1
2 Pembuatan Kartu Identitas Pekerja (KIP) 180
SUB JUMLAH I
II Sosialisasi dan Promosi K3
1 Induksi K3 (Safety Induction); Khusus untuk pekerja baru 180
2 Pelatihan K3
- Bekerja di Ketinggian 10
- K3 Peralatan Konstruksi & Penggunaan bahan Kimia (MSDS) 10
- Analysis Keselamatan Pekerja 20
- Perilaku Berbasis Keselamatan ( Budaya K3) 20
- P3K 2
3 Simulasi K3 180
4 Spanduk ( Banner) 2
5 Poster 2
6 Papan Informasi 2
SUB JUMLAH II
III Alat Pelindung Diri terdiri atas :
1 Topi Pelindung ( Safety Helmet) 180
2 Pelindung Mata (Googles, Spectacles) 10
NO URAIAN PEKERJAAN VOLUME

3 Tameng Muka ( Face Shield) 5


4 Pelindung Pernafasan dan Mulut ( Masker) 200
5 Sarung Tangan ( Safety Gloves) 20
6 Sepatu Keselamatan ( Safety Shoes) : Untuk Staf 10
7 Sepatu Keselamatan (Rubber Safety Shoes and toe cap) 40
8 Penunjang Seluruh tubuh ( Full Body harness) 20
9 Rompi Keselamatan ( Safety Vest) 180
10 Pelindung Jatuh ( Fall Arrester) 20
SUB JUMLAH III
SUB JUMLAH B

C PEKERJAAN STRUKTUR DAN ATAP


I PEKERJAAN GALIAN TANAH & URUGAN
II PEKERJAAN PONDASI
III PEKERJAAN BETON LANTAI BASEMENT / LANTAI DASAR
1 Pek. Beton Kolom Praktis 15/15, K-175 1.83
2 Pek. Beton Plat Lantai Ramp Entrance t= 15cm, K-250 7.88
3 Pek. Beton Plat Lantai Ramp Exit t= 15 cm, K-250 7.88
4 Pengadaan dan Pemasangan Pemasangan Karet Dilatasi 40.00
SUB JUMLAH III
IV PEKERJAAN BETON LANTAI 1
1 Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 26.18
2 Cor Beton Plat Tangga + Bordes, K-250 dan Perbaikan Bekisting existing 18.00
3 Cor Beton Plat Tangga Darurat+ Bordes, K-250 dan Perbaikan Bekisting existing 8.64
4 Pek. Beton Meja t=10cm, K-250 51.24
5 Pengadaan dan Pemasangan Pemasangan Karet Dilatasi 60.00
SUB JUMLAH IV
V PEKERJAAN BETON LANTAI 2
1 Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 29.98
2 Cor Beton Kolom Struktur K1 45/45, K-300 Perbaikan Bekisting existing 14.58
3 Cor Beton Kolom Struktur K2 35/45, K-300 Perbaikan Bekisting existing 11.78
4 Pengadaan dan Pemasangan Pemasangan Karet Dilatasi 60.00
SUB JUMLAH V
VI PEKERJAAN BETON DAK ATAP
1 Cor Beton Talang Beton t= 12 cm, K-250 dan Perbaikan Bekisting existing 27.00
2 Cor Beton Plat Dak Atap t= 15 cm, K-250 Landasan Tangki Air Pek dan Perbaikan Be 10.80
3 Cor Beton Balok Struktur B1a 30/60, K-250 dan Perbaikan Bekisting existing 62.21
4 Cor Beton Balok Struktur B1b 30/60 , K-250 dan Perbaikan Bekisting existing 4.58
5 Cor Beton Balok Struktur B2 25/45, K-250 dan Perbaikan Bekisting existing 11.88
6 Cor Beton Balok Struktur B3 25/45, K-250 dan Perbaikan Bekisting existing 16.90
7 Pengadaan dan Pemasangan Pemasangan Karet Dilatasi 30.00
SUB JUMLAH VI
VII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP
1 Erection Kolom Baja WF.300.150.6,5.9 R1 1,869.94
11/307
NO URAIAN PEKERJAAN VOLUME

2 Pengadaan dan Pemasangan Kolom Baja WF.300.150.6,5.9 R2 636.82


3 Erection Kuda-kuda Baja WF 300.150.6,5.9 R1 7,862.02
4 Erection Kuda-kuda Baja WF 300.150.6,5.9 R2 5,048.75
5 Pengadaan dan Pemasangan Kuda-kuda Baja WF 150.75.5.7 R3 575.90
6 Erection. Voute 1/2 WF 300.150.6,5.9 R1 dan R2 1,310.63
7 Pengadaan dan Pemasangan Voute 1/2 WF 150.75.5.7 R3 215.04
8 Pengadaan dan Pemasangan Gording CNP .150.65.20.3,2 10,850.40
9 Erection Besi L 70.70.7 Dudukan Gording 141.70
10 Pek Besi Plat Stifner t = 0,8 mm 207.24
11 Pengadaan dan Pemasangan Besi Trekstang Ø 12 mm 672.84
12 Pengadaan dan Pemasangan Ikatan Angin Kuda kuda / Besi D 16 mm Ulir 1,485.20
13 Pek. Angker Baud + Mur HTB M 20 288.00
14 Pek. Base Plat t = 1,8 mm 541.24
15 Pengadaan dan Pemasangan Beton Pedestal 45/45 K-250 2.92
16 Pengadaan dan Pemasangan Penutup Atap Bitumaen (Ref Produk Onduline) 2,119.16
17 Pengadaan dan Pemasangan Pasang Nok Bitumen ( ref Produk Onduline ) 62.00
18 Pengadaan dan Pemasangan Pasang Atap Solar flate Transparan 53.58
19 Pengadaan dan Pemasangan Pas Pipa Rangka Atap Solar Flate Ø 2 " 21.00
20 Pengadaan dan Pemasangan Pas Pipa Tiang Atap Solar Flate Ø 6 " 37.50
21 Pengadaan dan Pemasangan Pemasangan Karet Dilatasi 30.00
SUB JUMLAH VII
JUMLAH C PEKERJAAN STRUKTUR DAN ATAP
D PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI BASEMENT / LANTAI DASAR
II PEKERJAAN LANTAI 1
PEKERJAAN DINDING, PLESTERAN, ACIAN
1 Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 3,732.56
2 Pekerjaan plesteran dinding 1 : 5 7,465.12
3 Pekerjaan acian dinding sampai setinggi 3 m dr lantai 5,772.00
5 Pekerjaan Pas Ornamen Sirip Ikan 48.75
PEKERJAAN LANTAI
1 Pek. Keramik Lantai uk. 40x40 2,230.24
2 Pek. Keramik Lantai uk. 20x20 KM/WC 5.78
3 Pek. Keramik Dinding 20x25 KM/WC 39.60
4 Pek. Plin Keramik uk. 10x40 858.00
5 Pek. Keramik Dinding 20x20 Meja Beton sek. Mulia 149.52
6 Pek. Keramik Dinding 20x20 Kios tipe 5 sek. Mulia 171.84
PEKERJAAN CAT
1 Pekerjaan Pengecatan Dinding Interior + Kolom Beton, sek. Vinilex 5,426.40
2 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 345.60
3 Pekerjaan Pengecatan Plafon Beton + Balok Ekspose, sek. Vinilex 2,290.02
4 Pek. Laburan Waterproofing Cementitious Lantai KM/WC, sek. Sika 5.78
PEKERJAAN KUSEN, PINTU, JENDELA, BV
1 Pek. Pas. Kusen, Pintu & Asesoris tipe P1 1.00
2 Pek. Pas. Kusen, Pintu PVC KM.WC 2.00
NO URAIAN PEKERJAAN VOLUME

3 Pek. Pas. Kusen, Kaca & Asesoris tipe J1 16.00


4 Pek. Pas. Kusen, Kaca & Asesoris tipe J2 4.00
5 Pek. Pas. Kusen, Kaca & Asesoris tipe J3 1.00
6 Pek. Pas. Kusen, Kaca & Asesoris tipe BV 3 2.00
PEKERJAAN SANITAIR
1 Pek. Pasang Kloset Jongkok sek. Toto 2.00
2 Pek. Pasang Kran 1/2" sek. Toto 2.00
3 Pek. Pasang Floor Drain Sts sek. Toto 2.00
PEKERJAAN LAIN-LAIN
1 Hand Rail Pipa 2" Finish Cat 40.00
2 Pek. Railing Besi Hollow + Handrailing Pipa Besi Ø 2" Fin. Cat (Tangga Darurat ) 30.00
3 Pek. Urugan Pasir Urug Bawah Keramik t= 5cm 34.20

SUB JUMLAH II
III PEKERJAAN LANTAI 2
PEKERJAAN DINDING, PLESTERAN, ACIAN
1 Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 2,760.36
2 Pekerjaan plesteran dinding 1 : 5 5,520.72
3 Pekerjaan acian dinding sampai setinggi 3 m dr lantai 4,364.40
PEKERJAAN CAT
1 Pekerjaan Pengecatan Dinding Interior + Kolom Beton, sek. Vinilex 4,018.80
2 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 345.60
3 Pekerjaan Pengecatan Plafon gypsum 84.00
4 Pek. Laburan Waterproofing Cementitious Lantai KM/WC, sek. Sika 5.78
PEKERJAAN LANTAI
1 Pek. Keramik Lantai uk. 40x40 2,230.24
2 Pek. Keramik Lantai uk. 20x20 KM/WC 5.78
3 Pek. Keramik Dinding 20x25 KM/WC 39.60
4 Pek. Plin Keramik uk. 10x40 858.00
5 Pek. Keramik Dinding 20x20 Meja Beton sek. Mulia 149.52
6 Pek. Keramik Dinding 20x20 Kios tipe 5 sek. Mulia 171.84
PEKERJAAN PLAFOND
1 Pek. Rangka Plafon Hollow 84.00
2 Pek. Plafon Gypsum t= 9 mm sek. Knauf 84.00
PEKERJAAN KUSEN, PINTU, JENDELA, BV
1 Pek. Pas. Kusen, Pintu & Asesoris tipe P1 1.00
2 Pek. Pas. Kusen, Pintu & Asesoris tipe P2 4.00
3 Pek. Pas. Kusen, Pintu PVC KM.WC 2.00
4 Pek. Pas. Kusen, Kaca & Asesoris tipe J 1 6.00
5 Pek. Pas. Kusen, Kaca & Asesoris tipe J 2 4.00
6 Pek. Pas. Kusen, Kaca & Asesoris tipe J 3 1.00
7 Pek. Pas. Kusen, Kaca & Asesoris tipe BV 3 2.00
PEKERJAAN SANITAIR
1 Pek. Pasang Kloset Jongkok sek. Toto 2.00
2 Pek. Pasang Kran 1/2" sek. Toto 2.00

13/307
NO URAIAN PEKERJAAN VOLUME

3 Pek. Pasang Floor Drain Sts sek. Toto 2.00


PEKERJAAN LAIN-LAIN
1 Pek. Railing Besi Hollow + Handrailing Pipa Besi Ø 2" Fin. Cat (Tangga Darurat ) 30.00
2 Pek. Urugan Pasir Urug Bawah Keramik t= 5cm 34.20

SUB JUMLAH III


IV PEKERJAAN LANTAI DAK BETON
PEKERJAAN DINDING, PLESTERAN, ACIAN
1 Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 384.00
2 Pekerjaan plesteran dinding 1 : 5 768.00
3 Pekerjaan acian dinding 768.00
PEKERJAAN CAT, PELAPIS DINDING
1 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 768.00
2 Pek. Laburan Waterproofing Cementitious Dak Beton, sek. Sika 225.00
PEKERJAAN LAIN-LAIN
1 Pek. Screeding t= 7cm K-175 75.35
2 Pek. Pas. Huruf 3D Plat t= 0,8mm finishing Duco uk. 80x65x6 cm bertuliskan : 10.00
PASAR LELES
3 Pek. Pas. Huruf 3D Plat t= 1,8 m finishing Duco bertuliskan : GARUT 5.00
5 Pek. Pas. Roofdrain Sts Ø 3" 32.00

SUB JUMLAH IV
JUMLAH B ARSITEKTUR
TOTAL JUMLAH A+B
ERJAAN MINGGUAN
I ( SATU)
d 14 September 2019
OT PEKERJAAN

BOBOT REALISASI KEMAJUAN PEKERJAAN


SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)

m' 0.048 - 0.100 0.005 0.100 0.005


ls 0.048 - 0.100 0.005 0.100 0.005
ls 0.126 - 0.100 0.013 0.100 0.013
0.221 - 0.022 0.022
N KONSTRUKSI

set 0.004 - - - -
org 0.005 - - - -
0.009 - - -

org 0.004 - - - -

org 0.018 - - - -
org 0.018 - - - -
org 0.036 - - - -
org 0.036 - - - -
org 0.004 - - - -
org 0.005 - - - -
lbr 0.009 - - - -
lbr 0.009 - - - -
lbr 0.009 - - - -
0.146 - - -

bh 0.021 - 10.000 0.001 10.000 0.001


Psg 0.001 - 3.000 0.000 3.000 0.000
15/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
bh 0.007 - - - -
bh 0.002 - - - -
Psg 0.006 - - - -
Psg 0.030 - - - -
Psg 0.040 - 10.000 0.010 10.000 0.010
bh 0.012 - - - -
bh 0.011 - 10.000 0.001 10.000 0.001
bh 0.009 - - - -
0.140 - 0.012 0.012
0.295 - 0.012 0.012

m3 0.077 - - - -
m3 0.233 - - - -
m3 0.233 - - - -
m1 0.139 - - - -
0.682 - - -

m3 1.104 - - - -
m3 0.597 - - - -
m3 0.287 - - - -
m3 2.092 - - - -
m1 0.208 - - - -
4.288 - - -

m3 1.264 - - - -
m3 0.751 - - - -
m3 0.365 - - - -
m1 0.208 - - - -
2.588 - - -

m3 0.802 - - - -
m3 0.321 - - - -
m3 1.677 - - - -
m3 0.123 - - - -
m3 0.357 - - - -
m3 0.508 - - - -
m1 0.104 - - - -
3.891 - - -

kg 0.091 - - - -
BOBOT REALISASI KEMAJUAN PEKERJAAN
SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
kg 0.143 - - - -
kg 0.384 - - - -
kg 0.246 - - - -
kg 0.130 - - - -
kg 0.064 - - - -
kg 0.048 - - - -
kg 2.441 - - - -
kg 0.007 - - - -
kg 0.010 - - - -
kg 0.179 - - - -
kg 0.396 - - - -
bh 0.106 - - - -
kg 0.026 - - - -
m3 0.093 - - - -
m2 3.554 - - - -
m' 0.044 - - - -
m2 0.076 - - - -
m1 0.043 - - - -
m1 0.179 - - - -
m1 0.104 - - - -
8.365 - - -
19.814 - - -

m2 4.799 - - - -
m2 3.386 - - - -
m2 2.048 - - - -
m2

m2 5.512 - - - -
m2 0.012 - - - -
m2 0.085 - - - -
m1 0.213 - - - -
m2 0.323 - - - -
m2 0.371 - - - -

m2 1.182 - - - -
m2 0.083 - - - -
m2 0.523 - - - -
m2 0.004 - - - -

unit 0.064 - - - -
unit 0.010 - - - -
17/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
unit 0.603 - - - -
unit 0.247 - - - -
unit 0.034 - - - -
unit 0.010 - - - -

bh 0.018 - - - -
bh 0.004 - - - -
bh 0.003 - - - -

m1 0.082 - - - -
m1 0.149 - - - -
m3 0.092 - - - -

19.855 - - -

m2 3.549 - - - -
m2 2.504 - - - -
m2 1.548 - - - -

m2 0.875 - - - -
m2 0.083 - - - -
m2 0.019 - - - -
m2 0.004 - - - -

m2 5.512 - - - -
m2 0.012 - - - -
m2 0.085 - - - -
m1 0.213 - - - -
m2 0.323 - - - -
m2 0.371 - - - -

m2 0.026 - - - -
m2 0.042 - - - -

unit 0.064 - - - -
unit 0.144 - - - -
unit 0.010 - - - -
unit 0.226 - - - -
unit 0.247 - - - -
unit 0.034 - - - -
unit 0.010 - - - -

bh 0.018 - - - -
bh 0.004 - - - -
BOBOT REALISASI KEMAJUAN PEKERJAAN
SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
bh 0.003 - - - -

m1 0.149 - - - -
m3 0.092 - - - -

16.166 - - -

m2 0.494 - - - -
m2 0.348 - - - -
m2 0.272 - - - -

m2 0.184 - - - -
m2 0.166 - - - -

m3 0.605 - - - -
bh 0.056 - - - -

bh 0.054 - - - -
bh 0.030 - - - -

2.209 - - -
38.229 - - -
58.044 - - -

19/307
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 September 2019
REKAPITULASI BOBOT PEKERJAAN

PEKERJAAN : REVITALISASI PASAR RAKYAT LELES (LANJUTAN)


NOMOR KONTRAK : 027/996/SP-PPK/RPI-DisperindagESDM
TGL KONTRAK : Tanggal 10 September 2019
NILAI KONTRAK : Rp. 9.240.564.968,80 (termasuk PPN 10%)
KOTA KABUPATEN : GARUT
TAHUN ANGGARAN : 2019
PENYEDIA JASA PEMBORONGAN : PT. RAYNA DOMINIQUE ZALIKA
KONSULTAN PENGAWAS : CV. GRIYA LOKA
SUB PEKERJAAN : BANGUNAN SAMPING

BOBOT REALISASI KEMAJUAN PEKERJAAN


NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
A PEKERJAAN STRUKTUR DAN ATAP
I PEKERJAAN PERSIAPAN
SUB JUMLAH I
II PEKERJAAN GALIAN TANAH & URUGAN
SUB JUMLAH II
III PEKERJAAN PONDASI
SUB JUMLAH III
IV PEKERJAAN BETON LANTAI DASAR
2 Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 7.26 m3 0.306 - - - -

SUB JUMLAH IV 0.306 - - -


V PEKERJAAN BETON LANTAI 1
1 Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 9.45 m3 0.398 - - - -
10 Pek. Pemasangan Karet Dilatasi 12.00 m1 0.042 - - - -
11 Pek. Beton Plat Tangga + Bordes dan Perbaikan Bekisting existing 2.44 m³ 0.081 - - - -
12 Pek. Beton Plat Tangga + Bordes, K-250 dan Perbaikan Bekisting existing 1.00 unit 0.033 - - - -

SUB JUMLAH V 0.554 - - -


VI PEKERJAAN BETON LANTAI 2
1 Pek. Beton Kolom Praktis 15/15, K-175 0.90 m3 0.038 - - - -
2 Cor Beton Kolom Struktur K1 45/45, K-300 dan Perbaikan Bekisting existing 15.39 m3 0.793 - - - -
3 Cor Beton Kolom Struktur K2 35/45, K-300 dan Perbaikan Bekisting existing 5.10 m³ 0.158 - - - -
4 Cor Beton Balok Struktur B1a 30/60, K-250 Bekisting existing 15.20 m³ 0.410 - - - -
5 Cor Beton Balok Struktur B1b 30/60 , K-250 Bekisting existing 11.20 m³ 0.302 - - - -
6 Cor Beton Balok Struktur B1a 30/60 , K-250 Bekisting existing 0.79 m³ 0.021 - - - -
7 Cor Beton Balok Struktur B2 25/45, K-250 Bekisting existing 5.83 m³ 0.175 - - - -
8 Cor Beton Balok Struktur B3 25/45, K-250 Bekisting existing 1.02 m³ 0.031 - - - -
9 Cor Beton Plat Lantai t= 12 cm, K-250 Bekisting existing 53.13 m³ 1.432 - - - -
10 Pek Beton Tangga Split Level 1.00 unit 0.054 - - - -
SUB JUMLAH VI 3.413 - - -
VII PEKERJAAN BETON DAK ATAP
1 Pek. Beton Balok Struktur B1b 30/60 , K-250 36.98 m3 0.997 - - - -
SUB JUMLAH VII 0.997 - - -
VIII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP
1 Pek. Kolom Baja WF 200.100.5.6 127.98 kg 0.029 - - - -
2 Pek. Kuda-kuda Baja WF 200.100.5.6 895.86 kg 0.202 - - - -
3 Pek. Voute WF 200.100.5.6 95.99 kg 0.022 - - - -
4 Pek. Gording CNP 100.50.20.2,3 795.76 kg 0.189 - - - -
5 Pek Besi L 70.70.7 Dudukan Gording 59.41 kg 0.014 - - - -
6 Pek Besi Plat Stifner t = 0,8 mm 112.32 kg 0.030 - - - -
7 Pek. Besi Trekstang Ø 12 mm 166.61 kg 0.044 - - - -
8 Pek. Ikatan Angin Kuda kuda / Besi Ø 12 mm 178.00 kg 0.047 - - - -
9 Pek. Angker Baud + Mur HTB Ø 18 mm 48.00 bh 0.018 - - - -
10 Pek. Base Plat t = 1,8 mm 82.60 kg 0.022 - - - -
11 Pek. Beton Pedestal 40/40 K-250 0.26 m3 0.008 - - - -
12 Pek. Penutup Atap Bitumaen (Ref Produk Onduline) 485.39 m2 0.814 - - - -
13 Pek. Pasang Nok Bitumen ( ref Produk Onduline ) 14.00 m' 0.010 - - - -
SUB JUMLAH VIII 1.450 - - -
JUMLAH A STRUKTUR 6.720 - - -
B PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI Dasar
II PEKERJAAN LANTAI 1
PEKERJAAN DINDING, PLESTERAN, ACIAN
1 Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 1,089.00 m2 1.400 - - - -
2 Pekerjaan plesteran dinding 1 : 5 2,178.00 m2 0.988 - - - -
3 Pekerjaan acian dinding sampai setinggi 3 m dr lantai 1,452.00 m2 0.515 - - - -
PEKERJAAN CAT
1 Pekerjaan Pengecatan Dinding Interior + Kolom Beton, sek. Vinilex 1,065.00 m2 0.232 - - - -
2 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 387.00 m2 0.093 - - - -
3 Pekerjaan Pengecatan Plafon Beton + Balok Ekspose, sek. Vinilex 528.32 m2 0.121 - - - -
PEKERJAAN LANTAI
1 Pek. Keramik Lantai uk. 40x40 528.32 m2 1.306 - - - -
2 Pek. Plin Keramik uk. 10x40 398.00 m1 0.099 - - - -
PEKERJAAN PLAFOND
PEKERJAAN KUSEN, PINTU, JENDELA, BV
1 Pek. Pas. Kusen & Pintu Allumunium Spanrel tipe P1 1.00 unit 0.008 - - - -
2 Pek. Pas. Kusen, Jendela & Asesoris tipe J1 22.00 unit 0.168 - - - -

20/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
3 Pek. Pas. Kusen, Kaca & Asesoris tipe BV 2 1.00 unit 0.009 - - - -
PEKERJAAN LAIN-LAIN
1 Hand Rail Pipa 2" Finish Cat 40.00 m1 0.082 - - - -
2 Pek. Urugan Pasir Urug Bawah Keramik t= 10cm 52.83 m3 0.142 - - - -

SUB JUMLAH II 5.163 - - -


III PEKERJAAN LANTAI 2
IV PEKERJAAN LANTAI DAK BETON
JUMLAH B ARSITEKTUR 5.163 - - -
TOTAL JUMLAH A+B 11.882 - - -

21/307
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 September 2019
REKAPITULASI BOBOT PEKERJAAN

PEKERJAAN : REVITALISASI PASAR RAKYAT LELES (LANJUTAN)


NOMOR KONTRAK : 027/996/SP-PPK/RPI-DisperindagESDM
TGL KONTRAK : Tanggal 10 September 2019
NILAI KONTRAK : Rp. 9.240.564.968,80 (termasuk PPN 10%)
KOTA KABUPATEN : GARUT
TAHUN ANGGARAN : 2019
PENYEDIA JASA PEMBORONGAN : PT. RAYNA DOMINIQUE ZALIKA
KONSULTAN PENGAWAS : CV. GRIYA LOKA
SUB PEKERJAAN : BANGUNAN SITE

BOBOT REALISASI KEMAJUAN PEKERJAAN


NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
III PEKERJAAN SITE
A PEKERJAAN STRUKTUR DAN ARSITEKTUR

I PEKERJAAN JALAN
1.1 Pekerjaan Beton Rigid t= 15 cm, K 250 190.73 m3 2.518 - - - -
1.2 Pekerjaan Lantai Kerja t=5 cm, K 175 63.58 m3 0.510 - - - -
1.3 Pekerjaan Urugan Pasir urug dipadatkan t=10cm 127.16 m3 0.342 - - - -
1.4 Pekerjaan Paving blok Tbl 8 cm 260.00 m2 0.461 - - - -
1.5 Pekerjaan Kanstein Paving Blok 280.00 m1 0.163 - - - -
1.6 Pekerjaan Urugan Pasir Urug Drop Zone Di padatkan 18.00 m3 0.048 - - - -
1.7 Pekerjaan Pasangan Batu Drope Zone 77.00 m3 0.709 - - - -
1.8 Pekerjaan Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 70.00 m2 0.090 - - - -
1.9 Pekerjaan plesteran dinding 1 : 5 140.00 m2 0.063 - - - -
2.0 Pekerjaan plesteran Acian dinding 140.00 m2 0.050 - - - -
2.1 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 140.00 m2 0.033 - - - -

SUB JUMLAH I 4.988 - - -

II PEKERJAAN PAGAR
III PEKERJAAN SALURAN
3.1 Pekerjaan Saluran tipe 1 262.54 m1 1.570 - - - -
3.2 Pekerjaan Saluran tipe 2 21.25 m1 0.206 - - - -

SUB JUMLAH III 1.776 - - -


JUMLAH A 6.763 - - -

22/307
0

PEKERJAAN : STRUKTUR, ARSITEKTUR & M-E


POS JAGA
REVITALISASI PASAR LELES KABUPATEN GARUT

TAHUN ANGGARAN : REVITALISASI PASAR RAKYAT LELES (LANJUTAN)

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SAT
(Rp.) (Rp.)
IV PEKERJAAN POS JAGA
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pengukuran/bouwplank 12.00 m' 46,000.00 TAHAP BERIKUTNYA

SUB JUMLAH I -

II PEKERJAAN GALIAN TANAH & URUGAN PASIR


1 Pek. Galian Tanah Pondasi batu belah Menerus 4.20 m3 77,200.00 TAHAP BERIKUTNYA
2 Pek. Galian Tanah Pondasi batu belah Setempat 1.57 m3 77,200.00 TAHAP BERIKUTNYA
3 Pek. Urugan Tanah Kembali bks Galian Pondasi 1.15 m3 18,100.00 TAHAP BERIKUTNYA

SUB JUMLAH II -
III PEKERJAAN PONDASI
1 Pek. Pondasi Batu Belah Menerus camp. 1Pc : 3Psr 1.50 m3 773,000.00 TAHAP BERIKUTNYA
2 Pek. Pondasi Batu Belah Setempat camp. 1Pc : 3Psr 0.38 m3 773,000.00 TAHAP BERIKUTNYA
3 Pek. Urugan Pasir Urug Bawah Pondasi Batu Belah Menerus t=10cm 0.48 m3 226,000.00 TAHAP BERIKUTNYA
4 Pek. Urugan Pasir Urug Bawah Pondasi Batu Belah Setempat t=10cm 0.14 m3 226,000.00 TAHAP BERIKUTNYA
SUB JUMLAH III -
IV PEKERJAAN BETON
1 Pek. Beton Sloof 15/20, K-225 ( tul.144,88 kg/m3besi+bekisting) 0.35 m3 3,850,600.00 TAHAP BERIKUTNYA
2 Pek. Beton Kolom Praktis 15/15, K-225 (tul.181,81 kg/m3besi+bekisting) 0.47 m3 3,541,100.00 TAHAP BERIKUTNYA
3 Pek. Beton Meja t= 10cm 0.09 m3 3,430,000.00 TAHAP BERIKUTNYA
SUB JUMLAH IV -
V PEK. DINDING, PLESTERAN DAN ACIAN
1 Pasangan dinding Bata Merah Kls. 1, 1/2 campr 1 : 5 22.08 m2 108,000.00 TAHAP BERIKUTNYA
2 Pekerjaan plesteran dinding 1 : 5 44.16 m2 38,100.00 TAHAP BERIKUTNYA
3 Pekerjaan acian dinding dan Plafond Expose Beton 56.41 m2 29,800.00 TAHAP BERIKUTNYA
4 Pekerjaan Finishing Opening Pintu/jendela 1 : 5 3.00 m2 28,000.00 TAHAP BERIKUTNYA

SUB JUMLAH VI -
VI PEK. PENUTUP LANTAI DAN DINDING
1 Pek. Pas. Keramik Lantai 40x40 , Ruangan Dalam 4.00 m2 207,600.00 TAHAP BERIKUTNYA
2 Pek. Pas. Keramik Lantai 20x20 , KM/WC 2.56 m2 170,000.00 TAHAP BERIKUTNYA
3 Pek. Pas. Keramik Dinding 20x20, KM/WC 10.60 m2 181,200.00 TAHAP BERIKUTNYA
SUB JUMLAH VII -
VII PEK. KUSEN, DAUN PINTU DAN DAUN JENDELA ALUMUNIUM
1 Pek. Pas. Kusen Pintu PVC (Lkp engsel,kunci dan assr) Unit 419,000.00 TAHAP BERIKUTNYA
2 Pek. Pas. Kusen Type BV1 (Lkp kaca dan assesories) sek. Alexindo 1.00 Unit 1,464,000.00 TAHAP BERIKUTNYA
SUB JUMLAH VIII TAHAP BERIKUTNYA
VIII PEK. PENGECATAN
1 Pekerjaan Pengecatan Dinding Interior + Kolom Beton, sek. Vinilex 67.32 m2 18,300.00 TAHAP BERIKUTNYA
2 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 21.00 m2 20,100.00 TAHAP BERIKUTNYA
3 Pekerjaan Pengecatan Plafon Beton, sek. Vinilex 12.25 m2 19,200.00 TAHAP BERIKUTNYA
4 Pek. Laburan Waterproofing Cementitious Dak Beton, sek. Fosroc 12.25 m2 62,000.00 TAHAP BERIKUTNYA
SUB JUMLAH IX -
IX PEKERJAAN ELEKTRIKAL
1 Lampu LED 13 W (incl. fitting & accesories) 2.00 unit 77,100.00 TAHAP BERIKUTNYA
2 Saklar Ganda 1.00 unit 246,200.00 TAHAP BERIKUTNYA
3 Kotak Kontak 2.00 unit 93,600.00 TAHAP BERIKUTNYA
4 Instalansi Penerangan 2.00 ttk 509,100.00 TAHAP BERIKUTNYA
5 Instalansi Kotak Kontak 2.00 ttk 212,900.00 TAHAP BERIKUTNYA
6 kWh Meter 1 PH (incl. Box MCB & Accesories) 1.00 unit 943,800.00 TAHAP BERIKUTNYA

SUB JUMLAH XI -

JUMLAH IV

IV-Pos Jg Page 23
0
PEKERJAAN : GROUNDTANK
PROYEK : STRUKTUR, ARSITEKTUR
REVITALISASI PASAR LELES KABUPATEN GARUT

TAHUN ANGGARAN : REVITALISASI PASAR RAKYAT LELES (LANJUTAN)

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SAT
(Rp.) (Rp.)
V PEKERJAAN GROUNDTANK
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran / Steakout 58.00 m' 46,000.00 SUDAH SELESAI

II PEKERJAAN GALIAN TANAH & URUGAN


1 Pek. Galian Tanah Groundtank 422.40 m3 234,700.00 SUDAH SELESAI
4 2 Pek. Urugan Tanah Kembali bks Galian Pondasi 63.36 m3 18,100.00 SUDAH SELESAI
3 Pek. Urugan Pasir Urug 13.20 m3 226,000.00 SUDAH SELESAI

III PEKERJAAN BETON


1 Pek. Beton Plat Lantai & Dinding t= 20 cm, K-250 60.26 m3 3,362,800.00 SUDAH SELESAI
2 Pek. Beton Atap t= 20 cm, K-250 21.26 m3 2,494,000.00 SUDAH SELESAI
3 Pek. Beton Lantai Kerja t= 10 cm K-175, 10.63 m3 674,000.00 SUDAH SELESAI
4 Pekerjaan Waterproofing Cementitios sek. Sika 236.58 m2 62,000.00 TAHAP BERIKUTNYA
5 Pek. Lain-lain (Plat Manhole, Tangga Besi tanam) 1.00 ls 3,440,647.21 TAHAP BERIKUTNYA

JUMLAH I -

II PEKERJAAN RUMAH POMPA


I PEKERJAAN BETON
1 Pek. Beton Kolom Praktis 15/15, K-250 (tul.181,81 kg/m3besi+bekisting) 0.47 m3 4,101,000.00 TAHAP BERIKUTNYA
2 Pek. Beton Balok Lintel 12/10, K-250 ( tul.29,63 kg/m3besi+bekisting) 0.24 m3 1,708,900.00 TAHAP BERIKUTNYA
3 Pek. Beton Plat Dak t= 20 cm, K-250 ( tul.79,68 kg/m3besi+bekisting) 6.56 m3 3,362,800.00 TAHAP BERIKUTNYA
4 Pek. Beton Kanopi t= 10 cm, K-250 ( tul.79,68 kg/m3besi+bekisting) 0.22 m3 3,362,800.00 TAHAP BERIKUTNYA

II PEKERJAAN DINDING DAN LANTAI


1 Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 3 67.80 m2 116,700.00 TAHAP BERIKUTNYA
2 Pekerjaan plesteran dinding 1 : 3 135.60 m2 42,000.00 TAHAP BERIKUTNYA
3 Pekerjaan Acian Dinding 310.00 m2 29,800.00 TAHAP BERIKUTNYA
4 Pekerjaan Acian Beton 35.75 m2 29,800.00 TAHAP BERIKUTNYA

III PEKERJAAN CAT


1 Pekerjaan Pengecatan Dinding Exterior & Interior, sek. Viinilex 310.00 m2 20,100.00 TAHAP BERIKUTNYA
2 Pekerjaan Waterproofing Cementitios sek. Sika 35.75 m2 62,000.00 TAHAP BERIKUTNYA

IV PEKERJAAN KUSEN, PINTU, JENDELA


1 Pek. Pas. Kusen, Pintu & Asesoris tipe L4 1.00 unit 5,486,000.00 TAHAP BERIKUTNYA
2 Pek. Pas. Kusen, Kaca & Asesoris tipe L 3 1.00 unit 888,000.00 TAHAP BERIKUTNYA
3 Pek. Lain-lain (Plat Maanhole, Tangga Besi tanam) 1.00 ls 3,440,647.21 TAHAP BERIKUTNYA

JUMLAH II -

TOTAL JUMLAH -
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 September 2019
REKAPITULASI BOBOT PEKERJAAN

PEKERJAAN : REVITALISASI PASAR RAKYAT LELES (LANJUTAN)


NOMOR KONTRAK : 027/996/SP-PPK/RPI-DisperindagESDM
TGL KONTRAK : Tanggal 10 September 2019
NILAI KONTRAK : Rp. 9.240.564.968,80 (termasuk PPN 10%)
KOTA KABUPATEN : GARUT
TAHUN ANGGARAN : 2019
PENYEDIA JASA PEMBORONGAN : PT. RAYNA DOMINIQUE ZALIKA
KONSULTAN PENGAWAS : CV. GRIYA LOKA
SUB PEKERJAAN : RUMAH PANEL

BOBOT REALISASI KEMAJUAN PEKERJAAN


NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
PEKERJAAN RUMAH PANEL
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pengukuran/bouwplank 12.00 m' 0.007 - - - -

SUB JUMLAH I 0.007 - - -


II PEKERJAAN GALIAN TANAH & URUGAN PASIR
PEKERJAAN GALIAN TANAH & URUGAN PASIR
1 Pek. Galian Tanah Pondasi batu belah Menerus 5.04 m3 0.005 - - - -
2 Pek. Galian Tanah Pondasi batu belah Setempat 1.57 m3 0.001 - - - -
3 Pek. Urugan Tanah Kembali bks Galian Pondasi 1.32 m3 0.000 - - - -

SUB JUMLAH II 0.006 - - -


III PEKERJAAN PONDASI
2 Pek. Pondasi Batu Belah Menerus camp. 1Pc : 3Psr 3.78 m3 0.035 - - - -
3 Pek. Pondasi Batu Belah Setempat camp. 1Pc : 3Psr 0.85 m3 0.008 - - - -
4 Pek. Urugan Pasir Urug Bawah Pondasi Batu Belah Menerus t=10cm 0.72 m3 0.002 - - - -
5 Pek. Urugan Pasir Urug Bawah Pondasi Batu Belah Setempat t=10cm 0.14 m3 0.000 - - - -
SUB JUMLAH III 0.045 - - -
IV PEKERJAAN BETON
1 Pek. Beton Sloof 15/20, K-225 ( tul.144,88 kg/m3besi+bekisting) 0.36 m3 0.015 - - - -
2 Pek. Beton Kolom Praktis 15/15, K-225 (tul.181,81 kg/m3besi+bekisting) 0.32 m3 0.013 - - - -
4 Pek. Beton Ring Balok 15/20, K-225 ( tul.186,21 kg/m3besi+bekisting) 0.18 m3 0.008 - - - -
SUB JUMLAH IV 0.037 - - -
V PEKERJAAN BETON LANTAI DAN DAK
1 Pek. Beton Plat Dak t= 10 cm, K-250 ( tul.79,68 kg/m3besi+bekisting) 1.23 m3 0.049 - - - -
2 Pek. Beton Kanopi t= 10 cm, K-250 ( tul.79,68 kg/m3besi+bekisting) 0.33 m3 0.013 - - - -
3 Pek. Beton Lantai Kerja K-175 0.90 m3 0.007 - - - -
4 Pek. Beton Plat Lantai t= 10 cm, K-250 ( tul.79,68 kg/m3besi+bekisting) 0.90 m3 0.027 - - - -
SUB JUMLAH V 0.096 - - -
VI PEK. DINDING, PLESTERAN DAN ACIAN
1 Pasangan dinding Bata Merah Kls. 1, 1/2 campr 1 : 5 36.00 m2 0.046 - - - -
2 Pekerjaan plesteran dinding 1 : 5 72.00 m2 0.033 - - - -
3 Pekerjaan acian dinding dan Plafond Expose Beton 82.24 m2 0.029 - - - -
SUB JUMLAH VI 0.108 - - -
VII PEK. KUSEN, DAUN PINTU DAN DAUN JENDELA ALUMUNIUM
1 Pek. Pas. Kusen & Pintu Besi (Lkp engsel,kunci dan assr) 1.00 Unit 0.065 - - - -
2 Pek. Pas. Kusen Type L3 2.00 Unit 0.021 - - - -
SUB JUMLAH VII 0.086 - - -
VIII PEK. PENGECATAN
1 Pekerjaan Pengecatan Dinding Interior, sek. Vinilex 36.00 m2 0.008 - - - -
2 Pekerjaan pengecatan dinding Exterior, sek. Vinilex 36.00 m2 0.009 - - - -
3 Pekerjaan pengecatan Plafond Beton Ekspos, sek. Vinilex 12.25 m2 0.003 - - - -
4 Pek. Laburan Waterproofing Cementitious Dak Beton, sek. Sika 12.25 m2 0.009 - - - -
SUB JUMLAH VIII 0.028 - - -
TOTAL JUMLAH I+II+III+IV+V+VI+VIII 0.414 - - -

25/307
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 September 2019
REKAPITULASI BOBOT PEKERJAAN

PEKERJAAN : REVITALISASI PASAR RAKYAT LELES (LANJUTAN)


NOMOR KONTRAK : 027/996/SP-PPK/RPI-DisperindagESDM
TGL KONTRAK : Tanggal 10 September 2019
NILAI KONTRAK : Rp. 9.240.564.968,80 (termasuk PPN 10%)
KOTA KABUPATEN : GARUT
TAHUN ANGGARAN : 2019
PENYEDIA JASA PEMBORONGAN : PT. RAYNA DOMINIQUE ZALIKA
KONSULTAN PENGAWAS : CV. GRIYA LOKA
SUB PEKERJAAN : MEKANIKAL & ELEKTRIKAL BANGUNAN UTAMA

BOBOT REALISASI KEMAJUAN PEKERJAAN


NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
E PEKERJAAN MEKANIKAL & ELEKTRIKAL
I PEKERJAAN LANTAI BASEMENT
PEKERJAAN GENERATOR SET
1.1 Genset Kap. 100 kVA (Silent Type) 1.00 set
1.2 Panel Kontrol Genset (Sinkronize, AMF & ATS) 1.00 set
1.3 Daily Tank Cap. 2.000 liter (steel t = 4 mm) incl. Pondasi 1.00 set
1.4 Kabel Feeder dari Genset ke Panel PKG NYY 1(4x1x95mm2) 20.00 m
1.5 Kabel Feeder dari PKG ke LVMDP NYFGbY 1(4x1x95mm2) 110.00 m
1.6 Exhaust Fan Capacity : 2000 CMH, type wall, incl. automatic shute 2.00 unit
1.7 BBM/Solar 2,000.00 liter
1.8 Testing Commisioning Incl. BBM/Solar 1.00 lot

PEKERJAAN PANEL
1.9 Panel PP -Basement 1.00 set

PEKERJAAN INSTALASI KABEL FEEDER


Kabel Feeder dari LVMDP ke :
1.10 Panel PP -Basement NYFGbY 4 x 4 mm2 95.00 m

PEKERJAAN KABEL TRAY


1.11 Kabel Tray 300 x 50 mm 188.00 m
1.12 Kabel Tray 150 x 50 mm 188.00 m
1.13 Kabel Ladder 300 x 100 mm 5.00 m
1.14 Kabel Ladder 150 x 100 mm 5.00 m

PEKERJAAN ELEKTRIKAL
1.15 TL LED 1x10 W (V-SHAPE) 44.00 unit
1.16 TL LED 2x10 W (RM) 33.00 unit
1.17 Lampu LED 13 W (incl. fitting & accesories) 3.00 unit
1.18 Lampu LED 8 W (incl. fitting & accesories) 4.00 unit
1.18 Saklar tunggal 7.00 unit
1.19 Saklar Ganda 10.00 unit
1.20 Saklar 10 gang 2.00 unit
1.21 Kotak Kontak 18.00 unit
1.22 Instalansi Penerangan 84.00 ttk
1.23 Instalansi Kotak Kontak 18.00 ttk

PEKERJAAN PLUMBING
1.24 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 14.00 m
PVC ø 3/4 inc. 10.00 m
PVC (Riser) ø 2 inc. 5.00 m

1.25 Valve (Class 125 psi) & Accessories


Gate Valve ø 3/4 inc. 1.00 unit

1.26 Pipa air kotor (PVC class 10 kg/cm2, incl. accessories)


PVC ø 2 inc. 9.00 m
PVC ø 3 inc. 5.00 m
PVC ø 4 inc. 5.00 m
PVC ø 6 inc. 5.00 m

1.27 Pipa vent (PVC class 10 kg/cm2, incl. accessories)


PVC ø 1 1/4 inc. 20.00 m
PVC ø 2 inc. 5.00 m
PVC (Riser) ø 3 inc. 5.00 m

1.28 Floor Drain 3.00 unit


1.29 Clean Out ø 2 inc 2.00 unit
1.30 Clean Out ø 4 inc 2.00 unit
1.31 Bak kontrol 4.00 unit

1.32 Pump Pit Air Kotor include panel, cable & accessories 2.00 unit
Type : Submersible
Capacity : 50 liter/menit
Head : 10 m

1.33 Pump Pit Air Hujan include panel, cable & accessories 4.00 unit

26/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
Type : Submersible
Capacity : 250 liter/menit
Head : 10 m

PEKERJAAN EXHAUST FAN


1.34 EXHAUST FAN INCL.INSTALASI & Kotak Kontak
- Capacity : 150 CMH , type Ceiling, incl. ducting & grille 2.00 unit

PEKERJAAN PENCEGAH KEBAKARAN


1.35 Hydrant Box (Indoor) 2.00 set
Material : Steel, t 1,2 mm
Dimensi : (1250 x 750 x 180) mm
House Rack : 1,5 inc
Fire House : 40 mm x 30 m
Hydrant Nozzle : 1,5 inc
Hydrant Valve : 1,5 inc
Hydrant Valve : 2,5 inc
Alarm bel
Manual push button, jack telepon
Indicator lamp

1.36 Fire extinguiser 3.00 set


Capacity : 3 kg
Type : Dry chemical

1.37 Pipa Hydrant (BSP Sch 40, incl. accessories)


BSP ø 1 1/2 inc 2.00 m
BSP ø 2 1/2 inc 65.00 m
BSP ø 3 inc 5.00 m
BSP (riser) ø 6 inc 5.00 m

1.38 Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 230.00 m
BSP ø 1 1/4 inc 20.00 m
BSP ø 1 1/2 inc 15.00 m
BSP ø 2 inc 55.00 m
BSP ø 2 1/2 inc 65.00 m
BSP ø 3 inc 15.00 m
BSP ø 4 inc 20.00 m
BSP ø 6 inc 10.00 m
BSP (riser) ø 6 inc 5.00 m

1.39 Drain Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 75.00 m
BSP (riser drain) ø 2 inc 5.00 m

1.40 Valve (Class 20 K) & Accessories


Gate Valve ø 1 inc 1.00 unit
Gate Valve ø 3 inc 1.00 unit
Pressure Reducing Valv ø 6 inc 1.00 unit
Flow switch 1.00 unit
Head sprinkler (Upright type) 114.00 unit
Head sprinkler (pendent type) 36.00 unit

1.41 Branch control valve, terdiri dari 1.00 set


Gate Valve ø 6 inc
Gate Valve ø 1 inc
Flow switch
Sight glass

PEKERJAAN SOUND SYSTEM


1.42 Equipment Sound System 1.00 set
1.43 Ceiling Speaker 3 w 16.00 bh
1.44 Horn Speaker 8.00 bh
1.45 Volume Control 12.00 bh
1.46 Instalasi Tata Suara 24.00 ttk
1.47 TB - SS. 10 pairs 1.00 unit

PEKERJAAN FIRE ALARM


1.48 MCFA 1.00 bh
1.49 Annunciator 1.00 bh
1.50 Photo Electric Smoke Detector 3.00 bh
1.51 Rate Of Rise Heat Detector 15.00 bh
1.52 Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 2.00 bh
1.53 Instalasi Fire Alarm 18.00 ttk
1.54 Intalasi Push button, Alarm bell, Indicator lamp & Fighting Tlp. 2.00 ttk
1.55 TB - FA. 10 pairs 1.00 bh

PEKERJAAN CCTV
1.56 Digital Video Recorder (DVR) 16 Ch. 1.00 unit
1.57 Keyboard Controller 1.00 unit
1.58 TV Monitor 22" LCD 1.00 unit
1.59 Dome Camera Indoor 2.00 ttk
1.60 PTZ Camera 6.00 ttk
1.61 Instalasi CCTV 8.00 ttk

27/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
SUB JUMLAH I
II PEKERJAAN LANTAI 1
PEKERJAAN PANEL
2.1 Panel PP - lantai 2 1.00 unit 0.137 - - - -
2.2 kWh Meter 1 PH (incl. Box MCB & Accesories) 150.00 unit 1.458 - - - -

PEKERJAAN INSTALASI KABEL FEEDER


2.3 Kabel Feeder dari LVMDP ke :
Panel PP -Lantai 2 NYFGbY 4 x 35 mm2 110.00 m 0.216 - - - -
2.4 Kabel Feeder dari PP -Lantai 2 ke :
Kios kelompok 1 NYY 4 x 6 mm2 100.00 m 0.044 - - - -
Kios kelompok 2 NYY 4 x 6 mm2 90.00 m 0.039 - - - -
Kios kelompok 3 NYY 4 x 6 mm2 40.00 m 0.017 - - - -
Kios kelompok 4 NYY 4 x 6 mm2 100.00 m 0.044 - - - -
Kios kelompok 5 NYY 4 x 6 mm2 80.00 m 0.035 - - - -

PEKERJAAN KABEL TRAY


2.7 Kabel Tray 300 x 50 mm 491.00 m 0.800 - - - -
2.8 Kabel Tray 150 x 50 mm 491.00 m 0.660 - - - -
2.9 Kabel Ladder 300 x 100 mm 5.00 m 0.009 - - - -
2.10 Kabel Ladder 150 x 100 mm 5.00 m 0.007 - - - -

PEKERJAAN ELEKTRIKAL
2.11 TL LED 1x10 W (V-SHAPE) 147.00 unit 0.273 - - - -
2.12 Lampu LED 13 W (incl. fitting & accesories) 153.00 unit 0.171 - - - -
2.13 Lampu LED 8 W (incl. fitting & accesories) 4.00 unit 0.003 - - - -
2.14 Saklar tunggal 153.00 unit 0.039 - - - -
2.15 Saklar Ganda 10.00 unit 0.003 - - - -
2.16 Kotak Kontak 302.00 unit 0.077 - - - -
2.17 Instalansi Penerangan 304.00 ttk 0.696 - - - -
2.18 Instalansi Kotak Kontak 302.00 ttk 0.869 - - - -

PEKERJAAN PLUMBING
2.19 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 70.00 m 0.022 - - - -
PVC ø 3/4 inc. 85.00 m 0.029 - - - -
PVC ø 1 inc. 75.00 m 0.028 - - - -
PVC ø 1 1/2 inc. 20.00 m 0.009 - - - -
PVC ø 2 inc. 35.00 m 0.019 - - - -
PVC (Riser) ø 2 inc. 5.00 m 0.003 - - - -

2.20 Valve (Class 125 psi) & Accessories


Gate Valve ø 2 inc. 1.00 unit 0.005 - - - -
Gate Valve ø 3/4 inc. 42.00 unit 0.069 - - - -
Water Meter ø 3/4 inc. 42.00 unit 0.109 - - - -

2.21 Pipa air kotor (PVC class 10 kg/cm2, incl. accessories)


PVC ø 2 inc. 75.00 m 0.040 - - - -
PVC ø 3 inc. 145.00 m 0.124 - - - -
PVC ø 4 inc. 75.00 m 0.088 - - - -
PVC (Riser) ø 4 inc. 20.00 m 0.023 - - - -

2.22 Pipa vent (PVC class 10 kg/cm2, incl. accessories)


PVC ø 1 1/4 inc. 20.00 m 0.009 - - - -
PVC ø 2 inc. 5.00 m 0.003 - - - -
PVC (Riser) ø 3 inc. 5.00 m 0.004 - - - -

2.23 Floor Drain 3.00 unit 0.006 - - - -


2.24 Clean Out ø 2 inc 2.00 unit 0.004 - - - -
2.25 Clean Out ø 4 inc 2.00 unit 0.008 - - - -

PEKERJAAN EXHAUST FAN


2.26 EXHAUST FAN INCL.INSTALASI & Kotak Kontak
- Capacity : 150 CMH , type Ceiling, incl. ducting & grille 2.00 unit

PEKERJAAN PENCEGAH KEBAKARAN


2.27 Hydrant Box (Indoor) 3.00 set
Material : Steel, t 1,2 mm
Dimensi : (1250 x 750 x 180) mm
House Rack : 1,5 inc
Fire House : 40 mm x 30 m
Hydrant Nozzle : 1,5 inc
Hydrant Valve : 1,5 inc
Hydrant Valve : 2,5 inc
Alarm bel
Manual push button, jack telepon
Indicator lamp

2.28 Fire extinguiser 5.00 set


Capacity : 3 kg
Type : Dry chemical

2.29 Pipa Hydrant (BSP Sch 40, incl. accessories)


BSP ø 1 1/2 inc 3.00 m 0.003 - - - -
BSP ø 2 1/2 inc 60.00 m 0.086 - - - -

28/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
BSP ø 4 inc 5.00 m 0.012 - - - -
BSP (riser) ø 6 inc 5.00 m 0.020 - - - -

2.30 Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 200.00 m 0.104 - - - -
BSP ø 1 1/4 inc 15.00 m 0.012 - - - -
BSP ø 1 1/2 inc 80.00 m 0.069 - - - -
BSP ø 2 inc 80.00 m 0.082 - - - -
BSP ø 2 1/2 inc 50.00 m 0.071 - - - -
BSP ø 3 inc 25.00 m 0.044 - - - -
BSP ø 4 inc 35.00 m 0.085 - - - -
BSP ø 6 inc 10.00 m 0.040 - - - -
BSP (riser) ø 6 inc 5.00 m 0.020 - - - -

2.31 Drain Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 12.00 m 0.006 - - - -
BSP (riser drain) ø 2 inc 5.00 m 0.005 - - - -

2.32 Valve (Class 20 K) & Accessories


Gate Valve ø 1 inc 1.00 unit 0.001 - - - -
Gate Valve ø 4 inc 1.00 unit 0.008 - - - -
Pressure Reducing Valv ø 6 inc 1.00 unit 0.400 - - - -
Flow switch 1.00 unit 0.005 - - - -
Head sprinkler (pendent type) 115.00 unit 0.116 - - - -

2.33 Branch control valve, terdiri dari 1.00 set 0.206 - - - -


Gate Valve ø 6 inc
Gate Valve ø 1 inc
Flow switch
Sight glass

PEKERJAAN SOUND SYSTEM


2.34 Ceiling Speaker 3 w 48.00 bh
2.35 Volume Control 1.00 bh
2.36 Instalasi Tata Suara 48.00 ttk
2.37 TB - SS. 10 pairs 1.00 unit

PEKERJAAN FIRE ALARM


2.38 Rate Of Rise Heat Detector 58.00 bh
2.39 Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 1.00 bh
2.40 Instalasi Fire Alarm 58.00 ttk
2.41 Intalasi Push button, Alarm bell, Indicator lamp & Fighting Tlp. 1.00 ttk
2.42 TB - FA. 10 pairs 1.00 bh

PEKERJAAN CCTV
2.43 Dome Camera Indoor 6.00 ttk
2.44 Instalasi CCTV 6.00 ttk

SUB JUMLAH II 7.590 - - -


III PEKERJAAN LANTAI 2
PEKERJAAN PANEL
3.1 Panel PP - lantai 3 1.00 unit 0.142 - - - -
3.2 kWh Meter 1 PH (incl. Box MCB & Accesories) 135.00 unit 1.313 - - - -

PEKERJAAN INSTALASI KABEL FEEDER


3.3 Kabel Feeder dari LVMDP ke :
Panel PP -Lantai 3 NYFGbY 4 x 35 mm2 120.00 m 0.235 - - - -
3.4 Kabel Feeder dari PP -Lantai 3 ke :
Kios kelompok 1 NYY 4 x 6 mm2 100.00 m 0.044 - - - -
Kios kelompok 2 NYY 4 x 6 mm2 110.00 m 0.048 - - - -
Kios kelompok 3 NYY 4 x 6 mm2 30.00 m 0.013 - - - -
Kios kelompok 4 NYY 4 x 6 mm2 110.00 m 0.048 - - - -
Kios kelompok 5 NYY 4 x 6 mm2 80.00 m 0.035 - - - -

PEKERJAAN KABEL TRAY


3.7 Kabel Tray 300 x 50 mm 511.00 m 0.832 - - - -
3.8 Kabel Tray 150 x 50 mm 511.00 m 0.687 - - - -
3.9 Kabel Ladder 300 x 100 mm 5.00 m 0.009 - - - -
3.10 Kabel Ladder 150 x 100 mm 5.00 m 0.007 - - - -

PEKERJAAN ELEKTRIKAL
3.11 TL LED 1x10 W (V-SHAPE) 132.00 unit 0.245 - - - -
3.12 Lampu LED 13 W (incl. fitting & accesories) 143.00 unit 0.160 - - - -
3.13 Lampu LED 8 W (incl. fitting & accesories) 4.00 unit 0.003 - - - -
3.14 Saklar tunggal 140.00 unit 0.035 - - - -
3.15 Saklar Ganda 10.00 unit 0.003 - - - -
3.16 Kotak Kontak 269.00 unit 0.068 - - - -
3.17 Instalansi Penerangan 279.00 ttk 0.638 - - - -
3.18 Instalansi Kotak Kontak 269.00 ttk 0.774 - - - -

PEKERJAAN PLUMBING
3.19 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 70.00 m 0.022 - - - -
PVC ø 3/4 inc. 85.00 m 0.029 - - - -
PVC ø 1 inc. 75.00 m 0.028 - - - -
PVC ø 1 1/2 inc. 20.00 m 0.009 - - - -

29/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
PVC ø 2 inc. 35.00 m 0.019 - - - -
PVC (Riser) ø 2 inc. 5.00 m 0.003 - - - -

3.20 Valve (Class 125 psi) & Accessories


Gate Valve ø 2 inc. 1.00 unit 0.005 - - - -
Gate Valve ø 3/4 inc. 42.00 unit 0.069 - - - -
Water Meter ø 3/4 inc. 42.00 unit 0.109 - - - -

3.21 Pipa air kotor (PVC class 10 kg/cm2, incl. accessories)


PVC ø 2 inc. 75.00 m 0.040 - - - -
PVC ø 3 inc. 145.00 m 0.124 - - - -
PVC ø 4 inc. 75.00 m 0.088 - - - -
PVC (Riser) ø 4 inc. 20.00 m 0.023 - - - -

3.22 Floor Drain 3.00 unit 0.006 - - - -


3.23 Clean Out ø 2 inc 2.00 unit 0.004 - - - -
3.24 Clean Out ø 4 inc 2.00 unit 0.008 - - - -

3.25 Pipa vent (PVC class 10 kg/cm2, incl. accessories)


PVC ø 1 1/4 inc. 20.00 m 0.009 - - - -
PVC ø 2 inc. 5.00 m 0.003 - - - -
PVC (Riser) ø 3 inc. 5.00 m 0.004 - - - -

PEKERJAAN EXHAUST FAN


3.26 EXHAUST FAN INCL.INSTALASI & Kotak Kontak
- Capacity : 150 CMH , type Ceiling, incl. ducting & grille 2.00 unit

PEKERJAAN PENCEGAH KEBAKARAN


3.27 Hydrant Box (Indoor) 3.00 set
Material : Steel, t 1,2 mm
Dimensi : (1250 x 750 x 180) mm
House Rack : 1,5 inc
Fire House : 40 mm x 30 m
Hydrant Nozzle : 1,5 inc
Hydrant Valve : 1,5 inc
Hydrant Valve : 2,5 inc
Alarm bel
Manual push button, jack telepon
Indicator lamp

3.28 Fire extinguiser 3.00 set


Capacity : 3 kg
Type : Dry chemical

3.29 Pipa Hydrant (BSP Sch 40, incl. accessories)


BSP ø 1 1/2 inc 3.00 m 0.003 - - - -
BSP ø 2 1/2 inc 60.00 m 0.086 - - - -
BSP ø 4 inc 5.00 m 0.012 - - - -
BSP (riser) ø 6 inc 5.00 m 0.020 - - - -

3.30 Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 150.00 m 0.078 - - - -
BSP ø 1 1/4 inc 35.00 m 0.027 - - - -
BSP ø 1 1/2 inc 20.00 m 0.017 - - - -
BSP ø 2 inc 65.00 m 0.067 - - - -
BSP ø 2 1/2 inc 30.00 m 0.043 - - - -
BSP ø 3 inc 35.00 m 0.061 - - - -
BSP ø 4 inc 20.00 m 0.049 - - - -
BSP ø 6 inc 10.00 m 0.040 - - - -
BSP (riser) ø 6 inc 5.00 m 0.020 - - - -

3.31 Drain Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 85.00 m 0.044 - - - -
BSP (riser drain) ø 2 inc 5.00 m 0.005 - - - -

3.32 Valve (Class 20 K) & Accessories


Gate Valve ø 1 inc 1.00 unit 0.001 - - - -
Gate Valve ø 4 inc 1.00 unit 0.008 - - - -
Pressure Reducing Valv ø 6 inc 1.00 unit 0.400 - - - -
Flow switch 1.00 unit 0.005 - - - -
Head sprinkler (pendent type) 122.00 unit 0.123 - - - -

3.33 Branch control valve, terdiri dari 1.00 set 0.206 - - - -


Gate Valve ø 6 inc
Gate Valve ø 1 inc
Flow switch
Sight glass

PEKERJAAN SOUND SYSTEM


3.34 Ceiling Speaker 3 w 50.00 bh
3.35 Volume Control 1.00 bh
3.36 Instalasi Tata Suara 50.00 ttk
3.37 TB - SS. 10 pairs 1.00 unit

PEKERJAAN FIRE ALARM


3.38 Photo Electric Smoke Detector 1.00 bh

30/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
3.39 Rate Of Rise Heat Detector 67.00 bh
3.40 Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 1.00 bh
3.41 Instalasi Fire Alarm 68.00 ttk
3.42 Intalasi Push button, Alarm bell, Indicator lamp & Fighting Tlp. 1.00 ttk
3.43 TB - FA. 10 pairs 1.00 bh

PEKERJAAN CCTV
3.44 Dome Camera Indoor 6.00 ttk
3.45 Instalasi CCTV 6.00 ttk

SUB JUMLAH III 7.254 - - -


IV PEKERJAAN LANTAI DAK BETON
PEKERJAAN PLUMBING
4.1 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1 inc. 5.00 m 0.001 - - - -
PVC ø 2 inc. 20.00 m 0.005 - - - -

4.2 Valve (Class 125 psi) & Accessories


Gate Valve ø 1 inc. 2.00 unit 0.004 - - - -
Gate Valve ø 2 inc. 3.00 unit 0.011 - - - -

4.3 Pipa air hujan (PVC class 10 kg/cm2, incl. accessories)


Roof Drain 18.00 unit 0.041 - - - -
PVC ø 4 inc. 50.00 m 0.059 - - - -
PVC ø 6 inc. 30.00 m 0.071 - - - -

4.4 Roof TANK 2x4m3 1.00 set 0.391 - - - -

PEKERJAAN PENANGKAL PETIR & GROUNDING


4.5 Penangkal petir jenis Elekro statis (Radius protection 100 m) 1.00 set 0.173 - - - -
incl. Cable BC, support & accessories
4.6 Grounding penangkal petir incl. cable 2.00 ttk 0.074 - - - -
4.7 Grounding panel incl. cable 2.00 ttk 0.074 - - - -
4.8 Grounding Genset incl. cable 1.00 ttk 0.037 - - - -
4.9 Grounding Trafo incl. cable 1.00 ttk 0.037 - - - -
4.10 Grounding PABX 1.00 ttk 0.037 - - - -

SUB JUMLAH IV 1.015 - - -


JUMLAH C MEKANIKAL & ELEKTRIKAL 15.858 - - -
TOTAL JUMLAH A+B+C 15.858 - - -

31/307
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 September 2019
REKAPITULASI BOBOT PEKERJAAN

PEKERJAAN : REVITALISASI PASAR RAKYAT LELES (LANJUTAN)


NOMOR KONTRAK : 027/996/SP-PPK/RPI-DisperindagESDM
TGL KONTRAK : Tanggal 10 September 2019
NILAI KONTRAK : Rp. 9.240.564.968,80 (termasuk PPN 10%)
KOTA KABUPATEN : GARUT
TAHUN ANGGARAN : 2019
PENYEDIA JASA PEMBORONGAN : PT. RAYNA DOMINIQUE ZALIKA
KONSULTAN PENGAWAS : CV. GRIYA LOKA
SUB PEKERJAAN : MEKANIKAL & ELEKTRIKAL BANGUNAN SAMPING

BOBOT REALISASI KEMAJUAN PEKERJAAN


NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
C PEKERJAAN MEKANIKAL & ELEKTRIKAL
I PEKERJAAN LANTAI BASEMENT
PEKERJAAN PANEL
1.1 Panel PP - lantai Basement (Penunjang) 1.00 unit
1.2 kWh Meter 1 PH (incl. Box MCB & Accesories) 35.00 unit

PEKERJAAN INSTALASI KABEL FEEDER


1.3 Kabel Feeder dari LVMDP ke :
Panel PP - lantai 1 (Penunjang) NYFGbY 4 x 16 mm2 120.00 m
1.4 Kabel Feeder dari PP - lantai 1 (Penunjang) ke :
Kios kelompok 1 NYY 4 x 4 mm2 35.00 m
Kios kelompok 2 NYY 4 x 4 mm2 45.00 m

PEKERJAAN KABEL TRAY


1.5 Kabel Tray 300 x 50 mm 82.00 m
1.6 Kabel Tray 150 x 50 mm 82.00 m
1.7 Kabel Ladder 300 x 100 mm 5.00 m
1.8 Kabel Ladder 150 x 100 mm 5.00 m

PEKERJAAN ELEKTRIKAL
1.9 TL LED 1x10 W (V-SHAPE) 28.00 unit
1.10 Lampu LED 13 W (incl. fitting & accesories) 35.00 unit
1.11 Saklar tunggal 35.00 unit
1.12 Saklar Ganda 2.00 unit
1.13 Kotak Kontak 70.00 unit
1.14 Instalansi Penerangan 63.00 ttk
1.15 Instalansi Kotak Kontak 70.00 ttk

PEKERJAAN PENCEGAH KEBAKARAN


1.16 Hydrant Box (Indoor) 1.00 set
Material : Steel, t 1,2 mm
Dimensi : (1250 x 750 x 180) mm
House Rack : 1,5 inc
Fire House : 40 mm x 30 m
Hydrant Nozzle : 1,5 inc
Hydrant Valve : 1,5 inc
Hydrant Valve : 2,5 inc
Alarm bel
Manual push button, jack telepon
Indicator lamp

1.17 Fire extinguiser 2.00 set


Capacity : 3 kg
Type : Dry chemical

1.18 Pipa Hydrant (BSP Sch 40, incl. accessories)


BSP ø 1 1/2 inc 1.00 m
BSP ø 2 1/2 inc 10.00 m
BSP (riser) ø 2 1/2 inc 5.00 m

1.19 Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 95.00 m
BSP ø 1 1/2 inc 5.00 m
BSP ø 2 inc 10.00 m
BSP ø 2 1/2 inc 30.00 m
BSP (riser) ø 2 1/2 inc 5.00 m

1.20 Drain Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 10.00 m
BSP (riser drain) ø 2 inc 10.00 m

1.21 Valve (Class 20 K) & Accessories


Gate Valve ø 1 inc 1.00 unit
Gate Valve ø 2 1/2 inc 1.00 unit
Pressure Reducing Valv ø 2 1/2 inc 1.00 unit
Flow switch 1.00 unit
Head sprinkler (pendent type) 29.00 unit

32/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
1.22 Branch control valve, terdiri dari 1.00 set
Gate Valve ø 6 inc
Gate Valve ø 1 inc
Flow switch
Sight glass

PEKERJAAN SOUND SYSTEM


1.23 Ceiling Speaker 3 w 9.00 bh
1.24 Volume Control 1.00 bh
1.25 Instalasi Tata Suara 9.00 ttk
1.26 TB - SS. 10 pairs 1.00 unit

PEKERJAAN FIRE ALARM


1.28 Rate Of Rise Heat Detector 14.00 bh
1.29 Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 1.00 bh
1.30 Instalasi Fire Alarm 14.00 ttk
1.31 Intalasi Push button, Alarm bell, Indicator lamp & Fighting Tlp. 1.00 ttk
1.32 TB - FA. 10 pairs 1.00 bh

PEKERJAAN CCTV
1.33 Dome Camera Indoor 3.00 ttk
1.34 Instalasi CCTV 3.00 ttk

SUB JUMLAH I
II PEKERJAAN LANTAI 1
PEKERJAAN PANEL
2.1 Panel PP - lantai 2 (Penunjang) 1.00 unit 0.048 - - - -
2.2 kWh Meter 1 PH (incl. Box MCB & Accesories) 41.00 unit 0.399 - - - -

PEKERJAAN INSTALASI KABEL FEEDER


2.3 Kabel Feeder dari LVMDP ke :
Panel PP - lantai 2 (Penunjang) NYFGbY 4 x 25 mm2 120.00 m 0.189 - - - -
2.4 Kabel Feeder dari PP - lantai 2 (Penunjang) ke :
Kios kelompok 1 NYY 4 x 4 mm2 35.00 m 0.013 - - - -
Kios kelompok 2 NYY 4 x 4 mm2 45.00 m 0.016 - - - -

PEKERJAAN KABEL TRAY


2.5 Kabel Tray 300 x 50 mm 108.00 m 0.176 - - - -
2.6 Kabel Tray 150 x 50 mm 108.00 m 0.145 - - - -
2.7 Kabel Ladder 300 x 100 mm 5.00 m 0.009 - - - -
2.8 Kabel Ladder 150 x 100 mm 5.00 m 0.007 - - - -

PEKERJAAN ELEKTRIKAL
2.9 TL LED 1x10 W (V-SHAPE) 33.00 unit 0.061 - - - -
2.10 Lampu LED 13 W (incl. fitting & accesories) 41.00 unit 0.046 - - - -
2.11 Saklar tunggal 41.00 unit 0.010 - - - -
2.12 Saklar Ganda 2.00 unit 0.001 - - - -
2.13 Kotak Kontak 82.00 unit 0.021 - - - -
2.14 Instalansi Penerangan 74.00 ttk 0.169 - - - -
2.15 Instalansi Kotak Kontak 82.00 ttk 0.236 - - - -

PEKERJAAN PLUMBING
2.16 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 10.00 m 0.003 - - - -
PVC ø 3/4 inc. 10.00 m 0.003 - - - -
PVC ø 1 inc. 45.00 m 0.017 - - - -

2.17 Valve (Class 125 psi) & Accessories


Gate Valve ø 1 inc. 1.00 unit 0.002 - - - -
Gate Valve ø 3/4 inc. 10.00 unit 0.016 - - - -
Water Meter ø 3/4 inc. 10.00 unit 0.026 - - - -

2.18 Pipa air kotor (PVC class 10 kg/cm2, incl. accessories)


PVC ø 2 inc. 10.00 m 0.005 - - - -
PVC ø 3 inc. 17.00 m 0.015 - - - -
PVC ø 4 inc. 20.00 m 0.023 - - - -
PVC (Riser) ø 4 inc. 10.00 m 0.012 - - - -

PEKERJAAN PENCEGAH KEBAKARAN


2.19 Hydrant Box (Indoor) 1.00 set 0.045 - - - -
Material : Steel, t 1,2 mm
Dimensi : (1250 x 750 x 180) mm
House Rack : 1,5 inc
Fire House : 40 mm x 30 m
Hydrant Nozzle : 1,5 inc
Hydrant Valve : 1,5 inc
Hydrant Valve : 2,5 inc
Alarm bel
Manual push button, jack telepon
Indicator lamp

2.20 Fire extinguiser 3.00 set


Capacity : 3 kg
Type : Dry chemical

2.21 Pipa Hydrant (BSP Sch 40, incl. accessories)

33/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
BSP ø 1 1/2 inc 1.00 m 0.001 - - - -
BSP ø 2 1/2 inc 20.00 m 0.029 - - - -
BSP (riser) ø 2 1/2 inc 5.00 m 0.007 - - - -

2.22 Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 20.00 m 0.010 - - - -
BSP ø 1 1/2 inc 5.00 m 0.004 - - - -
BSP ø 2 inc 10.00 m 0.010 - - - -
BSP ø 2 1/2 inc 20.00 m 0.029 - - - -
BSP (riser) ø 2 1/2 inc 5.00 m 0.007 - - - -

2.23 Drain Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 20.00 m 0.010 - - - -
BSP (riser drain) ø 2 inc 5.00 m 0.005 - - - -

2.24 Valve (Class 20 K) & Accessories


Gate Valve ø 1 inc 1.00 unit 0.001 - - - -
Gate Valve ø 2 1/2 inc 1.00 unit 0.004 - - - -
Pressure Reducing Valv ø 2 1/2 inc 1.00 unit 0.144 - - - -
Flow switch 1.00 unit 0.005 - - - -
Head sprinkler (pendent type) 26.00 unit 0.026 - - - -

2.25 Branch control valve, terdiri dari 1.00 set 0.206 - - - -


Gate Valve ø 6 inc
Gate Valve ø 1 inc
Flow switch
Sight glass

PEKERJAAN SOUND SYSTEM


2.26 Ceiling Speaker 3 w 13.00 bh - - - - -
2.27 Volume Control 1.00 bh - - - - -
2.28 Instalasi Tata Suara 13.00 ttk - - - - -
2.29 TB - SS. 10 pairs 1.00 unit - - - - -

PEKERJAAN FIRE ALARM


2.30 Rate Of Rise Heat Detector 17.00 bh 0.019 - - - -
2.31 Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 1.00 bh 0.006 - - - -
2.32 Instalasi Fire Alarm 17.00 ttk 0.044 - - - -
2.33 Intalasi Push button, Alarm bell, Indicator lamp & Fighting Tlp. 1.00 ttk 0.003 - - - -
2.34 TB - FA. 10 pairs 1.00 bh 0.009 - - - -

PEKERJAAN CCTV
2.35 Dome Camera Indoor 3.00 ttk
2.36 Instalasi CCTV 3.00 ttk

SUB JUMLAH II 2.293 - - -


III PEKERJAAN LANTAI 2
PEKERJAAN PANEL
1.1 Panel PP - lantai 1 (Penunjang) 1.00 unit
1.2 kWh Meter 1 PH (incl. Box MCB & Accesories) 35.00 unit

PEKERJAAN INSTALASI KABEL FEEDER


1.3 Kabel Feeder dari LVMDP ke :
Panel PP - lantai 1 (Penunjang) NYFGbY 4 x 16 mm2 120.00 m
1.4 Kabel Feeder dari PP - lantai 1 (Penunjang) ke :
Kios kelompok 1 NYY 4 x 4 mm2 35.00 m
Kios kelompok 2 NYY 4 x 4 mm2 45.00 m

PEKERJAAN KABEL TRAY


1.5 Kabel Tray 300 x 50 mm 82.00 m
1.6 Kabel Tray 150 x 50 mm 82.00 m
1.7 Kabel Ladder 300 x 100 mm 5.00 m
1.8 Kabel Ladder 150 x 100 mm 5.00 m

PEKERJAAN ELEKTRIKAL
1.9 TL LED 1x10 W (V-SHAPE) 28.00 unit
1.10 Lampu LED 13 W (incl. fitting & accesories) 35.00 unit
1.11 Saklar tunggal 35.00 unit
1.12 Saklar Ganda 2.00 unit
1.13 Kotak Kontak 70.00 unit
1.14 Instalansi Penerangan 63.00 ttk
1.15 Instalansi Kotak Kontak 70.00 ttk

PEKERJAAN PENCEGAH KEBAKARAN


1.16 Hydrant Box (Indoor) 1.00 set
Material : Steel, t 1,2 mm
Dimensi : (1250 x 750 x 180) mm
House Rack : 1,5 inc
Fire House : 40 mm x 30 m
Hydrant Nozzle : 1,5 inc
Hydrant Valve : 1,5 inc
Hydrant Valve : 2,5 inc
Alarm bel
Manual push button, jack telepon
Indicator lamp

34/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
1.17 Fire extinguiser 2.00 set
Capacity : 3 kg
Type : Dry chemical

1.18 Pipa Hydrant (BSP Sch 40, incl. accessories)


BSP ø 1 1/2 inc 1.00 m
BSP ø 2 1/2 inc 10.00 m
BSP (riser) ø 2 1/2 inc 5.00 m
-
1.19 Pipa Sprinkler (BSP Sch 40, incl. accessories) -
BSP ø 1 inc 95.00 m
BSP ø 1 1/2 inc 5.00 m
BSP ø 2 inc 10.00 m
BSP ø 2 1/2 inc 30.00 m
BSP (riser) ø 2 1/2 inc 5.00 m

1.20 Drain Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 10.00 m
BSP (riser drain) ø 2 inc 10.00 m

1.21 Valve (Class 20 K) & Accessories


Gate Valve ø 1 inc 1.00 unit
Gate Valve ø 2 1/2 inc 1.00 unit
Pressure Reducing Valv ø 2 1/2 inc 1.00 unit
Flow switch 1.00 unit
Head sprinkler (pendent type) 29.00 unit

1.22 Branch control valve, terdiri dari 1.00 set


Gate Valve ø 6 inc
Gate Valve ø 1 inc
Flow switch
Sight glass

PEKERJAAN SOUND SYSTEM


1.23 Ceiling Speaker 3 w 9.00 bh
1.24 Volume Control 1.00 bh
1.25 Instalasi Tata Suara 9.00 ttk
1.26 TB - SS. 10 pairs 1.00 unit

PEKERJAAN FIRE ALARM


1.28 Rate Of Rise Heat Detector 14.00 bh
1.29 Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 1.00 bh
1.30 Instalasi Fire Alarm 14.00 ttk
1.31 Intalasi Push button, Alarm bell, Indicator lamp & Fighting Tlp. 1.00 ttk
1.32 TB - FA. 10 pairs 1.00 bh

PEKERJAAN CCTV
1.33 Dome Camera Indoor 3.00 ttk
1.34 Instalasi CCTV 3.00 ttk

SUB JUMLAH III


JUMLAH C MEKANIKAL & ELEKTRIKAL

35/307
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN
MINGGU KE : I ( SATU)
Tanggal : 10 September s/d 14 September 2019
REKAPITULASI BOBOT PEKERJAAN

PEKERJAAN : REVITALISASI PASAR RAKYAT LELES (LANJUTAN)


NOMOR KONTRAK : 027/996/SP-PPK/RPI-DisperindagESDM
TGL KONTRAK : Tanggal 10 September 2019
NILAI KONTRAK : Rp. 9.240.564.968,80 (termasuk PPN 10%)
KOTA KABUPATEN : GARUT
TAHUN ANGGARAN : 2019
PENYEDIA JASA PEMBORONGAN : PT. RAYNA DOMINIQUE ZALIKA
KONSULTAN PENGAWAS : CV. GRIYA LOKA
SUB PEKERJAAN : MEKANIKAL & ELEKTRIKAL BANGUNAN SITE

BOBOT REALISASI KEMAJUAN PEKERJAAN


NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
B PEKERJAAN SITE
I PEKERJAAN MEKANIKAL & ELEKTRIKAL SITE PLAN
PEKERJAAN PANEL & TRANSFORMATOR
1.1 Transformator kapasitas 100 kVA Oil Type 1.00 set 0.553 - - - -
1.2 PP - OD 1.00 set 0.061 - - - -

PEKERJAAN INSTALASI KABEL FEEDER


1.3 Kabel Feeder dari LVMDP ke :
Panel PP - OD NYFGbY 4 x 4 mm2 20.00 m 0.009 - - - -

PEKERJAAN PENERANGAN LUAR


1.4 Tiang PJU baja, Standard Octagonal, Parabole type, Single, 12.00 unit
Hot dip Galvanized, tinggi 7 m
1.5 Lampu LED 70 W 12.00 unit

PEKERJAAN PLUMBING
1.6 Pompa Deep Well 1.00 unit
Pompa Deep Well include panel, cable & accessories
Type : Submersible
Capacity : 200 liter/menit
Head : 150 m

1.7 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)


PVC ø 2 inc. 90.00 m 0.048 - - - -
PVC (Riser) ø 2 inc. 20.00 m 0.011 - - - -

1.8 Pipa air kotor (PVC class 10 kg/cm2, incl. accessories)


PVC ø 4 inc. 40.00 m 0.047 - - - -
PVC ø 6 inc. 141.00 m 0.334 - - - -
1.9 Bak kontrol 12.00 unit 0.035 - - - -
1.10 Biofil BF-08 2.00 unit 0.214 - - - -
1.11 Resapan 15.00 unit 0.260 - - - -

PEKERJAAN PENCEGAH KEBAKARAN


1.12 Hydrant Box (Outdoor) 4.00 set
Material : Stell, t 1,2 mm
Dimensi : 950x660x200 mm
House Rack : 2,5 inc
Fire House : 65x30.000 mm
Hydrant Nozzle : 2,5 inc

1.13 Hydrant Pillar 4.00 unit

1.14 Seamese Connection 2.00 unit


Size : 100x65x65 mm

1.15 Hydrant Pipe (BSP Sch.40, incl. accessories)


BSP ø 4 inc 50.00 m 0.122 - - - -
BSP ø 6 inc 50.00 m 0.198 - - - -

1.16 Valve Class 20 kg


Gate Valve ø 4 inc 6.00 unit 0.045 - - - -
Check Valve ø 4 inc 2.00 unit 0.100 - - - -

2.037 - - -

II PEKERJAAN MEKANIKAL & ELEKTRIKAL R. POMPA


PEKERJAAN PANEL
2.1 PP - GWT & R. POMPA 1.00 set
2.2 PP - POMPA 1.00 set
2.3 PP/LP R. POMPA 1.00 set
2.4 PP - HYDRANT 1.00 set

PEKERJAAN INSTALASI KABEL FEEDER


2.5 Kabel Feeder dari LVMDP ke :
Panel PP - GWT & R. POMPA NYFGbY 4 x 10 mm2 30.00 m
Panel PP - HYDRANT NYFGbY 4 x 95 mm2 25.00 m
2.6 Kabel Feeder dari PP- HYDRANT ke :
36/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
Pompa Electric NYY 4 x 70 mm2 15.00 m
Pompa Jockey NYY 4 x 4 mm2 15.00 m
2.7 Kabel Feeder dari PP - GWT & R. POMPA ke :
Panel PP - POMPA NYY 4 x 10 mm2 15.00 m
Panel PP/LP R. POMPA NYY 4 x 10 mm2 15.00 m
2.8 Kabel Feeder dari PP - GWT & R. POMPA ke :
Pompa Air bersih 1 NYY 4 x 4 mm2 15.00 m
Pompa Air bersih 1 NYY 4 x 4 mm2 15.00 m
Pompa Pembersih NYY 4 x 4 mm2 15.00 m
Pompa Deep Well NYFGbY 4 x 4 mm2 100.00 m

PEKERJAAN ELEKTRIKAL
2.9 TL LED 1x18 W (V-SHAPE) 2.00 unit
2.10 Saklar Ganda 1.00 unit
2.11 Kotak Kontak 4.00 unit
2.12 Instalansi Penerangan 2.00 ttk
2.13 Instalansi Kotak Kontak 4.00 ttk

PEKERJAAN PLUMBING
2.14 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 2 inc. 50.00 m 0.027 - - - -

2.15 Pompa Air Bersih 2.00 unit 0.573 - - - -


Pompa Transfer include panel, cable & accessories
Type : Centrifugal Endsuction
Capacity : 150 liter/menit
Head : 20 m

2.16 Pipa air hujan (PVC class 10 kg/cm2, incl. accessories)


PVC ø 4 inc. 10.00 m
Roof Drain ø 4 inc. 2.00 m

PEKERJAAN EXHAUST FAN


2.17 EXHAUST FAN INCL.INSTALASI & Kotak Kontak
- Capacity : 450 CMH , type Wall 2.00 unit

PEKERJAAN PENCEGAH KEBAKARAN


2.18 Electric Pump incl.panel 1.00 unit
Tipe : Vertical Turbine
Kapasitas : 750 GPM
Total Head : 100 m

2.19 Diesel Pump incl. panel, tangki bahan bakar & accessories 1.00 unit
Tipe : Vertical Turbine
Kapasitas : 750 GPM
Total Head : 100 m

2.20 Jockey Pump 1.00 unit


Tipe : Vertical multistage inline
Kapasitas : 15 GPM
Total Head : 110 m

2.21 Valve (Class 20 K) & Accessories


Gate Valve ø 2 inc 1.00 unit
Gate Valve ø 2 1/2 inc 1.00 unit
Gate Valve ø 6 inc 7.00 unit
Gate Valve ø 8 inc 1.00 unit
Check Valve ø 2 inc 1.00 unit
Check Valve ø 6 inc 2.00 unit

2.22 Flexible joint (Class 20 K) & Accessories


Joint Coupling ø 2 inc 1.00 unit
Joint Coupling ø 2 1/2 inc 1.00 unit
Joint Coupling ø 6 inc 4.00 unit

2.23 Accessories
Strainer ø 6 inc 2.00 unit
Automatic Air Release valve 1.00 unit
Pressure gauge 3.00 unit
Safety valve 1.00 unit

2.24 Pipa pemadam kebakaran (BSP Sch 40, incl. accessories)


BSP ø 2 inc 3.00 m
BSP ø 2 1/2 inc 3.00 m
BSP ø 6 inc 25.00 m

2.25 Testing & Commissioning 1.00 lot

2.26 Fire extinguiser 1.00 set


Capacity : 3 kg
Type : Dry chemical

0.600 - - -

III PEKERJAAN MEKANIKAL & ELEKTRIKAL R. PANEL


PEKERJAAN PANEL

37/307
BOBOT REALISASI KEMAJUAN PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(%) VOLUME (%) VOLUME (%) VOLUME (%)
3.1 Biaya Penyambungan PLN 105.00 kVA 1.153 - - - -
3.2 LVMDP 1.00 set 0.369 - - - -

PEKERJAAN INSTALASI KABEL FEEDER


3.3 Kabel Feeder dari LVMDP ke :
Panel PP - GWT & R. POMPA NYFGbY 4 x 10 mm2 20.00 m 0.015 - - - -
Kwh Meter R. PANEL NYFGbY 3 x 2,5 mm2 20.00 m 0.006 - - - -
Kwh Meter POS JAGA NYFGbY 3 x 2,5 mm2 30.00 m 0.009 - - - -

PEKERJAAN MEP R.PANEL


3.4 TL LED 1x18 W (V-SHAPE) 1.00 unit 0.002 - - - -
3.5 Saklar tunggal 1.00 unit 0.000 - - - -
3.6 Kotak Kontak 2.00 unit 0.001 - - - -
3.7 Instalansi Penerangan 1.00 ttk 0.002 - - - -
3.8 Instalansi Kotak Kontak 2.00 ttk 0.006 - - - -
3.9 kWh Meter 1 PH (incl. Box MCB & Accesories) 1.00 unit 0.012 - - - -

PEKERJAAN PLUMBING
3.10 Pipa air hujan (PVC class 10 kg/cm2, incl. accessories)
PVC ø 4 inc. 10.00 m 0.012 - - - -
Roof Drain ø 4 inc. 2.00 m 0.005 - - - -

1.593 - - -
4.229 - - -

38/307
TIME SCHEDULE
REVITALISASI PASAR RAKYAT LELES (LANJUTAN)
KABUPATEN GARUT
TAHUN ANGGARAN 2019

September Oktober
NO URAIAN PEKERJAAN Bobot
1 2 3 4 5 6 7
10 - 14 15 - 21 22 - 28 29 - 5 6 - 12 13 - 19 20 - 26

I PEKERJAAN BANGUNAN UTAMA


A PEKERJAAN PERSIAPAN 0.22 0.010 0.014 0.014 0.014 0.014 0.014 0.014

B PEKERJAAN PENYELENGGARAAN KEAMANAN DAN KESEHATAN KERJA SERTA KESELAMATAN KONSTRUKSI


0.30 0.017 0.017 0.017 0.017 0.017 0.017 0.017

C PEKERJAAN STRUKTUR DAN ATAP


I PEKERJAAN GALIAN TANAH & URUGAN 0.00
II PEKERJAAN PONDASI 0.00
III PEKERJAAN BETON LANTAI BASEMENT / LANTAI DASAR 0.68 0.227 0.227 0.227
IV PEKERJAAN BETON LANTAI 1 4.29 1.429 1.429 1.429
V PEKERJAAN BETON LANTAI 2 2.59 0.493 0.863 0.863
VI PEKERJAAN BETON DAK ATAP 3.89 1.297 1.297
VII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP 8.37 4.183

D PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI BASEMENT / LANTAI DASAR 0.00
II PEKERJAAN LANTAI 1 19.85 2.046 3.349 3.349 3.349
III PEKERJAAN LANTAI 2 16.17 1.900 3.529
IV PEKERJAAN LANTAI DAK BETON 2.21 0.111

E PEKERJAAN MEKANIKAL & ELEKTRIKAL


I PEKERJAAN LANTAI BASEMENT 0.00
II PEKERJAAN LANTAI 1 7.59

III PEKERJAAN LANTAI 2 7.25

IV PEKERJAAN LANTAI DAK BETON 1.01

II BANGUNAN SAMPING
A PEKERJAAN STRUKTUR DAN ATAP
I PEKERJAAN PERSIAPAN 0.00
II PEKERJAAN GALIAN TANAH & URUGAN 0.00
III PEKERJAAN PONDASI 0.00
IV PEKERJAAN BETON LANTAI DASAR 0.31 0.102
V PEKERJAAN BETON LANTAI 1 0.55
VI PEKERJAAN BETON LANTAI 2 3.41
VII PEKERJAAN BETON DAK ATAP 1.00
VIII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP 1.45
B PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI Dasar 0.00
II PEKERJAAN LANTAI 1 5.16
III PEKERJAAN LANTAI 2 0.00
IV PEKERJAAN LANTAI DAK BETON 0.00

C PEKERJAAN M-E
I PEKERJAAN LANTAI BASEMENT 0.00
II PEKERJAAN LANTAI 1 2.29
III PEKERJAAN LANTAI 2 0.00

III PEKERJAAN SITE


A PEKERJAAN STRUKTUR DAN ARSITEKTUR
I PEKERJAAN JALAN 4.99
II PEKERJAAN PAGAR 0.00
III PEKERJAAN SALURAN 1.78

B PEKERJAAN M-E
I PEKERJAAN MEKANIKAL & ELEKTRIKAL SITE PLAN 2.04
II PEKERJAAN MEKANIKAL & ELEKTRIKAL R. POMPA 0.60
III PEKERJAAN MEKANIKAL & ELEKTRIKAL R. PANEL 1.59

IV PEKERJAAN POS JAGA


PEKERJAAN POS JAGA 0.00
REALISASI PEKERJAAN
V PEKERJAAN GROUNDTANK & RUMAH POMPA
I PEKERJAAN GROUNDTANK 0.00
II PEKERJAAN RUMAH POMPA 0.00
VI PEKERJAAN RUMAH PANEL
I PEKERJAAN RUMAH PANEL 0.41

JUMLAH PROSENTASE 100.00


RENCANA KEMAJUAN PEKERJAAN 0.027 0.031 0.031 2.077 5.530 9.097 15.122
KUMULATIF RENCANA KEMAJUAN PEKERJAAN 0.00 0.027 0.058 0.089 2.167 7.697 16.794 31.916
REALISASI KEMAJUAN PEKERJAAN 0.034
REALISASI KUMULATIF KEMAJUAN PEKERJAAN 0.00 0.034 0.034 0.034 0.034 0.034 0.034 0.034
DEVIASI 0.00 0.007 0.042 0.076 0.111 0.145 0.180 0.214

PT. ......................
Diperiksa Oleh,
Konsultan Pengawas
CV. GRIYA LOKA

Ir. Mohamad Tahri


Team Leader
E SCHEDULE
R RAKYAT LELES (LANJUTAN)
PATEN GARUT
ANGGARAN 2019
TAHUN 2019
Oktober November Desember
8 9 10 11 12 13 14 15 16 17
27 - 2 3-9 10 - 16 17 - 23 24 - 30 1-7 8 - 14 15 - 21 22 - 28 29 - 31

0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.006

0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017

0.370
1.297
4.183

3.349 3.579 0.723 0.108


3.529 3.529 1.629 1.516 0.534
0.780 0.770 0.547

1.898 1.898 1.898 1.898

0.518 1.813 1.813 1.813 1.295

0.181 0.254 0.254 0.254 0.072

0.102 0.102
0.139 0.139 0.139 0.139
0.853 0.853 0.853 0.853
0.332 0.332 0.332
0.483 0.483 0.483

0.645 0.903 0.903 0.903 0.903 0.903

RENCANA PEKERJAAN

0.287 0.287 0.287 0.287 0.287 0.287 0.287 0.287

1.164 1.164 1.164 1.164 0.333

0.401 0.401 0.401 0.401 0.172

0.339 0.339 0.339 0.339 0.388 0.291


0.343 0.257
0.319 0.319 0.319 0.364 0.273

0.059 0.059 0.059 0.059 0.059 0.059 0.059

16.195 12.955 8.233 7.602 4.957 4.391 4.318 4.318 3.652 1.464
48.111 61.066 69.299 76.900 81.857 86.248 90.566 94.885 98.536 100.000

0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034
0.249 0.283 0.318 0.352 0.386 0.421 0.455 0.490 0.524 0.559

Garut, 14 September 2019


Dibuat Oleh,
Kontraktor Pelaksana
PT. RAYNA DOMINIQUE ZALIKA

Bonaventura, ST
Project Manager
NO URAIAN PEKERJAAN Bobot
1 2
10 11 12 13 14 15 16 17

I PEKERJAAN BANGUNAN UTAMA


A PEKERJAAN PERSIAPAN 0.22 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
1.1 Pek. Pengukuran 0.05 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
1.2 Mobilisasi & Demobilisasi 0.05 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
1.3 Pembersihan Lahan 0.13 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

B PEKERJAAN PENYELENGGARAAN KEAMANAN DAN KESEHATAN KERJA SERTA KESELAMATAN


KONSTRUKSI
0.30 0.016 0.016
Persiapan K3
1 Penyiapan RK3K terdiri atas : Pembuatan Manual, Prosedur, Instruksi Kerja 0.00 0.000 0.000
2 Pembuatan Kartu Identitas Pekerja (KIP) 0.01 0.000 0.000

Sosialisasi dan Promosi K3


1 Induksi K3 (Safety Induction); Khusus untuk pekerja baru 0.00 0.000 0.000
2 Pelatihan K3
- Bekerja di Ketinggian 0.02 0.001 0.001
- K3 Peralatan Konstruksi & Penggunaan bahan Kimia (MSDS) 0.02 0.001 0.001
- Analysis Keselamatan Pekerja 0.04 0.002 0.002
- Perilaku Berbasis Keselamatan ( Budaya K3) 0.04 0.002 0.002
- P3K 0.00 0.000 0.000
3 Simulasi K3 0.01 0.000 0.000
4 Spanduk ( Banner) 0.01 0.000 0.000
5 Poster 0.01 0.000 0.000
6 Papan Informasi 0.01 0.000 0.000

Alat Pelindung Diri terdiri atas :


1 Topi Pelindung ( Safety Helmet) 0.02 0.001 0.001
2 Pelindung Mata (Googles, Spectacles) 0.00 0.000 0.000
3 Tameng Muka ( Face Shield) 0.01 0.000 0.000
4 Pelindung Pernafasan dan Mulut ( Masker) 0.00 0.000 0.000
5 Sarung Tangan ( Safety Gloves) 0.01 0.000 0.000
6 Sepatu Keselamatan ( Safety Shoes) : Untuk Staf 0.03 0.002 0.002
7 Sepatu Keselamatan (Rubber Safety Shoes and toe cap) 0.04 0.002 0.002
8 Penunjang Seluruh tubuh ( Full Body harness) 0.01 0.001 0.001
9 Rompi Keselamatan ( Safety Vest) 0.01 0.001 0.001
10 Pelindung Jatuh ( Fall Arrester) 0.01 0.000 0.000

C PEKERJAAN STRUKTUR DAN ATAP


I PEKERJAAN GALIAN TANAH & URUGAN 0.00
II PEKERJAAN PONDASI 0.00
III PEKERJAAN BETON LANTAI BASEMENT / LANTAI DASAR 0.68
1 Pek. Beton Kolom Praktis 15/15, K-175 0.08
2 Pek. Beton Plat Lantai Ramp Entrance t= 15cm, K-250 0.23
3 Pek. Beton Plat Lantai Ramp Exit t= 15 cm, K-250 0.23
4 Pengadaan dan Pemasangan Pemasangan Karet Dilatasi 0.14
IV PEKERJAAN BETON LANTAI 1 4.29
1 Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 1.10
2 Cor Beton Plat Tangga + Bordes, K-250 dan Perbaikan Bekisting existing 0.60
3 Cor Beton Plat Tangga Darurat+ Bordes, K-250 dan Perbaikan Bekisting existing 0.29
4 Pek. Beton Meja t=10cm, K-250 2.09
5 Pengadaan dan Pemasangan Pemasangan Karet Dilatasi 0.21
V PEKERJAAN BETON LANTAI 2 2.59
1 Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 1.26
2 Cor Beton Kolom Struktur K1 45/45, K-300 Perbaikan Bekisting existing 0.75
3 Cor Beton Kolom Struktur K2 35/45, K-300 Perbaikan Bekisting existing 0.37
4 Pengadaan dan Pemasangan Pemasangan Karet Dilatasi 0.21
VI PEKERJAAN BETON DAK ATAP 3.89
1 Cor Beton Talang Beton t= 12 cm, K-250 dan Perbaikan Bekisting existing 0.80
2 Cor Beton Plat Dak Atap t= 15 cm, K-250 Landasan Tangki Air Pek dan Perbaikan Bekisting existi 0.32
3 Cor Beton Balok Struktur B1a 30/60, K-250 dan Perbaikan Bekisting existing 1.68
4 Cor Beton Balok Struktur B1b 30/60 , K-250 dan Perbaikan Bekisting existing 0.12
5 Cor Beton Balok Struktur B2 25/45, K-250 dan Perbaikan Bekisting existing 0.36
6 Cor Beton Balok Struktur B3 25/45, K-250 dan Perbaikan Bekisting existing 0.51
7 Pengadaan dan Pemasangan Pemasangan Karet Dilatasi 0.10
VII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP 8.37
1 Erection Kolom Baja WF.300.150.6,5.9 R1 0.09
2 Pengadaan dan Pemasangan Kolom Baja WF.300.150.6,5.9 R2 0.14
3 Erection Kuda-kuda Baja WF 300.150.6,5.9 R1 0.38
4 Erection Kuda-kuda Baja WF 300.150.6,5.9 R2 0.25
5 Pengadaan dan Pemasangan Kuda-kuda Baja WF 150.75.5.7 R3 0.13
6 Erection. Voute 1/2 WF 300.150.6,5.9 R1 dan R2 0.06
7 Pengadaan dan Pemasangan Voute 1/2 WF 150.75.5.7 R3 0.05
8 Pengadaan dan Pemasangan Gording CNP .150.65.20.3,2 2.44
9 Erection Besi L 70.70.7 Dudukan Gording 0.01
10 Pek Besi Plat Stifner t = 0,8 mm 0.01
11 Pengadaan dan Pemasangan Besi Trekstang Ø 12 mm 0.18
12 Pengadaan dan Pemasangan Ikatan Angin Kuda kuda / Besi D 16 mm Ulir 0.40
13 Pek. Angker Baud + Mur HTB M 20 0.11
14 Pek. Base Plat t = 1,8 mm 0.03
15 Pengadaan dan Pemasangan Beton Pedestal 45/45 K-250 0.09
16 Pengadaan dan Pemasangan Penutup Atap Bitumaen (Ref Produk Onduline) 3.55
17 Pengadaan dan Pemasangan Pasang Nok Bitumen ( ref Produk Onduline ) 0.04
18 Pengadaan dan Pemasangan Pasang Atap Solar flate Transparan 0.08
19 Pengadaan dan Pemasangan Pas Pipa Rangka Atap Solar Flate Ø 2 " 0.04
20 Pengadaan dan Pemasangan Pas Pipa Tiang Atap Solar Flate Ø 6 " 0.18
21 Pengadaan dan Pemasangan Pemasangan Karet Dilatasi 0.10

D PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI BASEMENT / LANTAI DASAR 0.00
II PEKERJAAN LANTAI 1 19.85
PEKERJAAN DINDING, PLESTERAN, ACIAN
1 Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 4.80
2 Pekerjaan plesteran dinding 1 : 5 3.39
3 Pekerjaan acian dinding sampai setinggi 3 m dr lantai 2.05
PEKERJAAN LANTAI
1 Pek. Keramik Lantai uk. 40x40 5.51
2 Pek. Keramik Lantai uk. 20x20 KM/WC 0.01
3 Pek. Keramik Dinding 20x25 KM/WC 0.09
4 Pek. Plin Keramik uk. 10x40 0.21
5 Pek. Keramik Dinding 20x20 Meja Beton sek. Mulia 0.32
6 Pek. Keramik Dinding 20x20 Kios tipe 5 sek. Mulia 0.37
PEKERJAAN CAT
1 Pekerjaan Pengecatan Dinding Interior + Kolom Beton, sek. Vinilex 1.18
2 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 0.08
3 Erection Kolom Baja WF.300.150.6,5.9 R1 0.52
4 Pek. Laburan Waterproofing Cementitious Lantai KM/WC, sek. Sika 0.00
PEKERJAAN KUSEN, PINTU, JENDELA, BV
1 Pek. Pas. Kusen, Pintu & Asesoris tipe P1 0.06
2 Pek. Pas. Kusen, Pintu PVC KM.WC 0.01
3 Pek. Pas. Kusen, Kaca & Asesoris tipe J 1 0.60
4 Pek. Pas. Kusen, Kaca & Asesoris tipe J 2 0.25
5 Pek. Pas. Kusen, Kaca & Asesoris tipe J 3 0.03
6 Pek. Pas. Kusen, Kaca & Asesoris tipe BV 3 0.01
PEKERJAAN SANITAIR
1 Pek. Pasang Kloset Jongkok sek. Toto 0.02
2 Pek. Pasang Kran 1/2" sek. Toto 0.00
3 Pek. Pasang Floor Drain Sts sek. Toto 0.00
PEKERJAAN LAIN-LAIN
1 Hand Rail Pipa 2" Finish Cat 0.08
2 Pek. Railing Besi Hollow + Handrailing Pipa Besi Ø 2" Fin. Cat (Tangga Darurat ) 0.15
3 Pek. Urugan Pasir Urug Bawah Keramik t= 5cm 0.09

III PEKERJAAN LANTAI 2 16.17


PEKERJAAN DINDING, PLESTERAN, ACIAN
1 Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 3.55
2 Pekerjaan plesteran dinding 1 : 5 2.50
3 Pekerjaan acian dinding sampai setinggi 3 m dr lantai 1.55
PEKERJAAN CAT
1 Pekerjaan Pengecatan Dinding Interior + Kolom Beton, sek. Vinilex 0.88
2 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 0.08
3 Pekerjaan Pengecatan Plafon gypsum 0.02
4 Pek. Laburan Waterproofing Cementitious Lantai KM/WC, sek. Sika 0.00
PEKERJAAN LANTAI
1 Pek. Keramik Lantai uk. 40x40 5.51
2 Pek. Keramik Lantai uk. 20x20 KM/WC 0.01
3 Pek. Keramik Dinding 20x25 KM/WC 0.09
4 Pek. Plin Keramik uk. 10x40 0.21
5 Pek. Keramik Dinding 20x20 Meja Beton sek. Mulia 0.32
6 Pek. Keramik Dinding 20x20 Kios tipe 5 sek. Mulia 0.37
PEKERJAAN PLAFOND
1 Pek. Rangka Plafon Hollow 0.03
2 Pek. Plafon Gypsum t= 9 mm sek. Knauf 0.04
PEKERJAAN KUSEN, PINTU, JENDELA, BV
1 Pek. Pas. Kusen, Pintu & Asesoris tipe P1 0.06
2 Pek. Pas. Kusen, Pintu & Asesoris tipe P2 0.14
3 Pek. Pas. Kusen, Pintu PVC KM.WC 0.01
4 Pek. Pas. Kusen, Kaca & Asesoris tipe J 1 0.23
5 Pek. Pas. Kusen, Kaca & Asesoris tipe J 2 0.25
6 Pek. Pas. Kusen, Kaca & Asesoris tipe J 3 0.03
7 Pek. Pas. Kusen, Kaca & Asesoris tipe BV 3 0.01
PEKERJAAN SANITAIR
1 Pek. Pasang Kloset Jongkok sek. Toto 0.02
2 Pek. Pasang Kran 1/2" sek. Toto 0.00
3 Pek. Pasang Floor Drain Sts sek. Toto 0.00
PEKERJAAN LAIN-LAIN
1 Pek. Railing Besi Hollow + Handrailing Pipa Besi Ø 2" Fin. Cat (Tangga Darurat ) 0.15
2 Pek. Urugan Pasir Urug Bawah Keramik t= 5cm 0.09

IV PEKERJAAN LANTAI DAK BETON 2.21


PEKERJAAN DINDING, PLESTERAN, ACIAN
1 Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 0.49
2 Pekerjaan plesteran dinding 1 : 5 0.35
3 Pekerjaan acian dinding 0.27
PEKERJAAN CAT, PELAPIS DINDING
1 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 0.18
2 Pek. Laburan Waterproofing Cementitious Dak Beton, sek. Sika 0.17
PEKERJAAN LAIN-LAIN
1 Pek. Screeding t= 7cm K-175 0.60
2 Pek. Pas. Huruf 3D Plat t= 0,8mm finishing Duco uk. 80x65x6 cm bertuliskan : 0.06
PASAR LELES
3 Pek. Pas. Huruf 3D Plat t= 1,8 m finishing Duco bertuliskan : GARUT 0.05
5 Pek. Pas. Roofdrain Sts Ø 3" 0.03

E PEKERJAAN MEKANIKAL & ELEKTRIKAL


I PEKERJAAN LANTAI BASEMENT 0.00
II PEKERJAAN LANTAI 1 7.59
PEKERJAAN PANEL
2.1 Panel PP - lantai 2 0.14
2.2 kWh Meter 1 PH (incl. Box MCB & Accesories) 1.46
PEKERJAAN INSTALASI KABEL FEEDER
2.3 Kabel Feeder dari LVMDP ke :
Panel PP -Lantai 2 NYFGbY 4 x 35 mm2 0.22
2.4 Kabel Feeder dari PP -Lantai 2 ke :
Kios kelompok 1 NYY 4 x 6 mm2 0.04
Kios kelompok 2 NYY 4 x 6 mm2 0.04
Kios kelompok 3 NYY 4 x 6 mm2 0.02
Kios kelompok 4 NYY 4 x 6 mm2 0.04
Kios kelompok 5 NYY 4 x 6 mm2 0.03
PEKERJAAN KABEL TRAY
2.7 Kabel Tray 300 x 50 mm 0.80
2.8 Kabel Tray 150 x 50 mm 0.66
2.9 Kabel Ladder 300 x 100 mm 0.01
2.10 Kabel Ladder 150 x 100 mm 0.01
PEKERJAAN ELEKTRIKAL
2.11 TL LED 1x10 W (V-SHAPE) 0.27
2.12 Lampu LED 13 W (incl. fitting & accesories) 0.17
2.13 Lampu LED 8 W (incl. fitting & accesories) 0.00
2.14 Saklar tunggal 0.04
2.15 Saklar Ganda 0.00
2.16 Kotak Kontak 0.08
2.17 Instalansi Penerangan 0.70
2.18 Instalansi Kotak Kontak 0.87
PEKERJAAN PLUMBING
2.19 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 0.02
PVC ø 3/4 inc. 0.03
PVC ø 1 inc. 0.03
PVC ø 1 1/2 inc. 0.01
PVC ø 2 inc. 0.02
PVC (Riser) ø 2 inc. 0.00
2.20 Valve (Class 125 psi) & Accessories
Gate Valve ø 2 inc. 0.00
Gate Valve ø 3/4 inc. 0.07
Water Meteø 3/4 inc. 0.11
2.21 Pipa air kotor (PVC class 10 kg/cm2, incl. accessories)
PVC ø 2 inc. 0.04
PVC ø 3 inc. 0.12
PVC ø 4 inc. 0.09
PVC (Riser) ø 4 inc. 0.02
2.22 Pipa vent (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1 1/4 inc. 0.01
PVC ø 2 inc. 0.00
PVC (Riser) ø 3 inc. 0.00
2.23 Floor Drain 0.01
2.24 Clean Out ø 2 inc 0.00
2.25 Clean Out ø 4 inc 0.01
2.29 Pipa Hydrant (BSP Sch 40, incl. accessories)
BSP ø 1 1/2 inc 0.00
BSP ø 2 1/2 inc 0.09
BSP ø 4 inc 0.01
BSP (riser) ø 6 inc 0.02
2.30 Pipa Sprinkler (BSP Sch 40, incl. accessories)
BSP ø 1 inc 0.10
BSP ø 1 1/4 inc 0.01
BSP ø 1 1/2 inc 0.07
BSP ø 2 inc 0.08
BSP ø 2 1/2 inc 0.07
BSP ø 3 inc 0.04
BSP ø 4 inc 0.09
BSP ø 6 inc 0.04
BSP (riser) ø 6 inc 0.02
2.31 Drain Pipa Sprinkler (BSP Sch 40, incl. accessories)
BSP ø 1 inc 0.01
BSP (riser dø 2 inc 0.01
2.32 Valve (Class 20 K) & Accessories
Gate Valve ø 1 inc 0.00
Gate Valve ø 4 inc 0.01
Pressure Reø 6 inc 0.40
Flow switch 0.00
Head sprinkler (pendent type) 0.12
2.33 Branch control valve, terdiri dari 0.21
Gate Valve ø 6 inc
Gate Valve ø 1 inc
Flow switch
Sight glass

III PEKERJAAN LANTAI 2 7.25


PEKERJAAN PANEL
3.1 Panel PP - lantai 3 0.14
3.2 kWh Meter 1 PH (incl. Box MCB & Accesories) 1.31
PEKERJAAN INSTALASI KABEL FEEDER
3.3 Kabel Feeder dari LVMDP ke :
Panel PP -Lantai 3 NYFGbY 4 x 35 mm2 0.24
3.4 Kabel Feeder dari PP -Lantai 3 ke :
Kios kelompok 1 NYY 4 x 6 mm2 0.04
Kios kelompok 2 NYY 4 x 6 mm2 0.05
Kios kelompok 3 NYY 4 x 6 mm2 0.01
Kios kelompok 4 NYY 4 x 6 mm2 0.05
Kios kelompok 5 NYY 4 x 6 mm2 0.03
PEKERJAAN KABEL TRAY
3.7 Kabel Tray 300 x 50 mm 0.83
3.8 Kabel Tray 150 x 50 mm 0.69
3.9 Kabel Ladder 300 x 100 mm 0.01
3.10 Kabel Ladder 150 x 100 mm 0.01
PEKERJAAN ELEKTRIKAL
3.11 TL LED 1x10 W (V-SHAPE) 0.25
3.12 Lampu LED 13 W (incl. fitting & accesories) 0.16
3.13 Lampu LED 8 W (incl. fitting & accesories) 0.00
3.14 Saklar tunggal 0.04
3.15 Saklar Ganda 0.00
3.16 Kotak Kontak 0.07
3.17 Instalansi Penerangan 0.64
3.18 Instalansi Kotak Kontak 0.77
PEKERJAAN PLUMBING
3.19 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 0.02
PVC ø 3/4 inc. 0.03
PVC ø 1 inc. 0.03
PVC ø 1 1/2 inc. 0.01
PVC ø 2 inc. 0.02
PVC (Riser) ø 2 inc. 0.00
3.20 Valve (Class 125 psi) & Accessories
Gate Valve ø 2 inc. 0.00
Gate Valve ø 3/4 inc. 0.07
Water Meteø 3/4 inc. 0.11
3.21 Pipa air kotor (PVC class 10 kg/cm2, incl. accessories)
PVC ø 2 inc. 0.04
PVC ø 3 inc. 0.12
PVC ø 4 inc. 0.09
PVC (Riser) ø 4 inc. 0.02
3.22 Floor Drain 0.01
3.23 Clean Out ø 2 inc 0.00
3.24 Clean Out ø 4 inc 0.01
3.25 Pipa vent (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1 1/4 inc. 0.01
PVC ø 2 inc. 0.00
PVC (Riser) ø 3 inc. 0.00
3.29 Pipa Hydrant (BSP Sch 40, incl. accessories)
BSP ø 1 1/2 inc 0.00
BSP ø 2 1/2 inc 0.09
BSP ø 4 inc 0.01
BSP (riser) ø 6 inc 0.02
3.30 Pipa Sprinkler (BSP Sch 40, incl. accessories)
BSP ø 1 inc 0.08
BSP ø 1 1/4 inc 0.03
BSP ø 1 1/2 inc 0.02
BSP ø 2 inc 0.07
BSP ø 2 1/2 inc 0.04
BSP ø 3 inc 0.06
BSP ø 4 inc 0.05
BSP ø 6 inc 0.04
BSP (riser) ø 6 inc 0.02
3.31 Drain Pipa Sprinkler (BSP Sch 40, incl. accessories)
BSP ø 1 inc 0.04
BSP (riser dø 2 inc 0.01
3.32 Valve (Class 20 K) & Accessories
Gate Valve ø 1 inc 0.00
Gate Valve ø 4 inc 0.01
Pressure Reø 6 inc 0.40
Flow switch 0.00
Head sprinkler (pendent type) 0.12
3.33 Branch control valve, terdiri dari 0.21
Gate Valve ø 6 inc
Gate Valve ø 1 inc
Flow switch
Sight glass

IV PEKERJAAN LANTAI DAK BETON 1.01


PEKERJAAN PLUMBING
4.1 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1 inc. 0.00
PVC ø 2 inc. 0.00
4.2 Valve (Class 125 psi) & Accessories
Gate Valve ø 1 inc. 0.00
Gate Valve ø 2 inc. 0.01
4.3 Pipa air hujan (PVC class 10 kg/cm2, incl. accessories)
Roof Drain 0.04
PVC ø 4 inc. 0.06
PVC ø 6 inc. 0.07
4.4 Roof TANK 2x4m3 0.39
PEKERJAAN PENANGKAL PETIR & GROUNDING
4.5 Penangkal petir jenis Elekro statis (Radius protection 100 m) 0.17
incl. Cable BC, support & accessories
4.6 Grounding penangkal petir incl. cable 0.07
4.7 Grounding panel incl. cable 0.07
4.8 Grounding Genset incl. cable 0.04
4.9 Grounding Trafo incl. cable 0.04
4.10 Grounding PABX 0.04

II BANGUNAN SAMPING
A PEKERJAAN STRUKTUR DAN ATAP
I PEKERJAAN PERSIAPAN 0.00
II PEKERJAAN GALIAN TANAH & URUGAN 0.00
III PEKERJAAN PONDASI 0.00
IV PEKERJAAN BETON LANTAI DASAR 0.31
2 Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 0.31
V PEKERJAAN BETON LANTAI 1 0.55
1 Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 0.40
10 Pek. Pemasangan Karet Dilatasi 0.04
11 Pek. Beton Plat Tangga + Bordes dan Perbaikan Bekisting existing 0.08
12 Pek. Beton Plat Tangga + Bordes, K-250 dan Perbaikan Bekisting existing 0.03
VI PEKERJAAN BETON LANTAI 2 3.41
1 Pek. Beton Kolom Praktis 15/15, K-175 0.04
2 Cor Beton Kolom Struktur K1 45/45, K-300 dan Perbaikan Bekisting existing 0.79
3 Cor Beton Kolom Struktur K2 35/45, K-300 dan Perbaikan Bekisting existing 0.16
4 Cor Beton Balok Struktur B1a 30/60, K-250 Bekisting existing 0.41
5 Cor Beton Balok Struktur B1b 30/60 , K-250 Bekisting existing 0.30
6 Cor Beton Balok Struktur B1a 30/60 , K-250 Bekisting existing 0.02
7 Cor Beton Balok Struktur B2 25/45, K-250 Bekisting existing 0.18
8 Cor Beton Balok Struktur B3 25/45, K-250 Bekisting existing 0.03
9 Cor Beton Plat Lantai t= 12 cm, K-250 Bekisting existing 1.43
10 Pek Beton Tangga Split Level 0.05
VII PEKERJAAN BETON DAK ATAP 1.00
1 Pek. Beton Balok Struktur B1b 30/60 , K-250 1.00
VIII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP 1.45
1 Pek. Kolom Baja WF 200.100.5.6 0.03
2 Pek. Kuda-kuda Baja WF 200.100.5.6 0.20
3 Pek. Voute WF 200.100.5.6 0.02
4 Pek. Gording CNP 100.50.20.2,3 0.19
5 Pek Besi L 70.70.7 Dudukan Gording 0.01
6 Pek Besi Plat Stifner t = 0,8 mm 0.03
7 Pek. Besi Trekstang Ø 12 mm 0.04
8 Pek. Ikatan Angin Kuda kuda / Besi Ø 12 mm 0.05
9 Pek. Angker Baud + Mur HTB Ø 18 mm 0.02
10 Pek. Base Plat t = 1,8 mm 0.02
11 Pek. Beton Pedestal 40/40 K-250 0.01
12 Pek. Penutup Atap Bitumaen (Ref Produk Onduline) 0.81
13 Pek. Pasang Nok Bitumen ( ref Produk Onduline ) 0.01
B PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI Dasar 0.00
II PEKERJAAN LANTAI 1 5.16
PEKERJAAN DINDING, PLESTERAN, ACIAN
1 Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 1.40
2 Pekerjaan plesteran dinding 1 : 5 0.99
3 Pekerjaan acian dinding sampai setinggi 3 m dr lantai 0.52
PEKERJAAN CAT
1 Pekerjaan Pengecatan Dinding Interior + Kolom Beton, sek. Vinilex 0.23
2 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 0.09
3 Pekerjaan Pengecatan Plafon Beton + Balok Ekspose, sek. Vinilex 0.12
PEKERJAAN LANTAI
1 Pek. Keramik Lantai uk. 40x40 1.31
2 Pek. Plin Keramik uk. 10x40 0.10
PEKERJAAN KUSEN, PINTU, JENDELA, BV
1 Pek. Pas. Kusen & Pintu Allumunium Spanrel tipe P1 0.01
2 Pek. Pas. Kusen, Jendela & Asesoris tipe J1 0.17
3 Pek. Pas. Kusen, Kaca & Asesoris tipe BV 2 0.01
PEKERJAAN LAIN-LAIN
1 Hand Rail Pipa 2" Finish Cat 0.08
2 Pek. Urugan Pasir Urug Bawah Keramik t= 10cm 0.14

III PEKERJAAN LANTAI 2 0.00


IV PEKERJAAN LANTAI DAK BETON 0.00

C PEKERJAAN M-E
I PEKERJAAN LANTAI BASEMENT 0.00
II PEKERJAAN LANTAI 1 2.29
PEKERJAAN PANEL
2.1 Panel PP - lantai 2 (Penunjang) 0.05
2.2 kWh Meter 1 PH (incl. Box MCB & Accesories) 0.40
PEKERJAAN INSTALASI KABEL FEEDER
2.3 Kabel Feeder dari LVMDP ke :
Panel PP - lantai 2 (Penunjang) NYFGbY 4 x 25 mm2 0.19
2.4 Kabel Feeder dari PP - lantai 2 (Penunjang) ke :
Kios kelompok 1 NYY 4 x 4 mm2 0.01
Kios kelompok 2 NYY 4 x 4 mm2 0.02
PEKERJAAN KABEL TRAY
2.5 Kabel Tray 300 x 50 mm 0.18
2.6 Kabel Tray 150 x 50 mm 0.15
2.7 Kabel Ladder 300 x 100 mm 0.01
2.8 Kabel Ladder 150 x 100 mm 0.01
PEKERJAAN ELEKTRIKAL
2.9 TL LED 1x10 W (V-SHAPE) 0.06
2.10 Lampu LED 13 W (incl. fitting & accesories) 0.05
2.11 Saklar tunggal 0.01
2.12 Saklar Ganda 0.00
2.13 Kotak Kontak 0.02
2.14 Instalansi Penerangan 0.17
2.15 Instalansi Kotak Kontak 0.24
PEKERJAAN PLUMBING
2.16 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 0.00
PVC ø 3/4 inc. 0.00
PVC ø 1 inc. 0.02
2.17 Valve (Class 125 psi) & Accessories
Gate Valve ø 1 inc. 0.00
Gate Valve ø 3/4 inc. 0.02
Water Meteø 3/4 inc. 0.03
2.18 Pipa air kotor (PVC class 10 kg/cm2, incl. accessories)
PVC ø 2 inc. 0.01
PVC ø 3 inc. 0.01
PVC ø 4 inc. 0.02
PVC (Riser) ø 4 inc. 0.01
PEKERJAAN PENCEGAH KEBAKARAN
2.19 Hydrant Box (Indoor) 0.04
Material
Dimensi
House Rack
Fire House
Hydrant Nozzle
Hydrant Valve
Hydrant Valve
Alarm bel
Manual push button, jack telepon
Indicator lamp
2.21 Pipa Hydrant (BSP Sch 40, incl. accessories)
BSP ø 1 1/2 inc 0.00
BSP ø 2 1/2 inc 0.03
BSP (riser) ø 2 1/2 inc 0.01
2.22 Pipa Sprinkler (BSP Sch 40, incl. accessories)
BSP ø 1 inc 0.01
BSP ø 1 1/2 inc 0.00
BSP ø 2 inc 0.01
BSP ø 2 1/2 inc 0.03
BSP (riser) ø 2 1/2 inc 0.01
2.23 Drain Pipa Sprinkler (BSP Sch 40, incl. accessories)
BSP ø 1 inc 0.01
BSP (riser dø 2 inc 0.01
2.24 Valve (Class 20 K) & Accessories
Gate Valve ø 1 inc 0.00
Gate Valve ø 2 1/2 inc 0.00
Pressure Reø 2 1/2 inc 0.14
Flow switch 0.00
Head sprinkler (pendent type) 0.03
2.25 Branch control valve, terdiri dari
Gate Valve ø 6 inc 0.21
Gate Valve ø 1 inc
Flow switch
Sight glass
PEKERJAAN FIRE ALARM
2.30 Rate Of Rise Heat Detector 0.02
2.31 Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 0.01
2.32 Instalasi Fire Alarm 0.04
2.33 Intalasi Push button, Alarm bell, Indicator lamp & Fighting Tlp. 0.00
2.34 TB - FA. 10 pairs 0.01

III PEKERJAAN LANTAI 2 0.00

III PEKERJAAN SITE


A PEKERJAAN STRUKTUR DAN ARSITEKTUR
I PEKERJAAN JALAN 4.99
1.1 Pekerjaan Beton Rigid t= 15 cm, K 250 2.52
1.2 Pekerjaan Lantai Kerja t=5 cm, K 175 0.51
1.3 Pekerjaan Urugan Pasir urug dipadatkan t=10cm 0.34
1.4 Pekerjaan Paving blok Tbl 8 cm 0.46
1.5 Pekerjaan Kanstein Paving Blok 0.16
1.6 Pekerjaan Urugan Pasir Urug Drop Zone Di padatkan 0.05
1.7 Pekerjaan Pasangan Batu Drope Zone 0.71
1.8 Pekerjaan Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 0.09
1.9 Pekerjaan plesteran dinding 1 : 5 0.06
2.0 Pekerjaan plesteran Acian dinding 0.05
2.1 Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 0.03

II PEKERJAAN PAGAR 0.00


III PEKERJAAN SALURAN 1.78
3.1 Pekerjaan Saluran tipe 1 1.57
3.2 Pekerjaan Saluran tipe 2 0.21

B PEKERJAAN M-E
I PEKERJAAN MEKANIKAL & ELEKTRIKAL SITE PLAN 2.04
PEKERJAAN PANEL & TRANSFORMATOR
1.1 Transformator kapasitas 100 kVA Oil Type 0.55
1.2 PP - OD 0.06
PEKERJAAN INSTALASI KABEL FEEDER
1.3 Kabel Feeder dari LVMDP ke :
Panel PP - OD NYFGbY 4 x 4 mm2 0.01
PEKERJAAN PLUMBING
1.7 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 2 inc. 0.05
PVC (Riser) ø 2 inc. 0.01
1.8 Pipa air kotor (PVC class 10 kg/cm2, incl. accessories)
PVC ø 4 inc. 0.05
PVC ø 6 inc. 0.33
1.9 Bak kontrol 0.03
1.10 Biofil BF-08 0.21
1.11 Resapan 0.26
1.15 Hydrant Pipe (BSP Sch.40, incl. accessories)
BSP ø 4 inc 0.12
BSP ø 6 inc 0.20
1.16 Valve Class 20 kg
Gate Valve ø 4 inc 0.05
Check Valveø 4 inc 0.10

II PEKERJAAN MEKANIKAL & ELEKTRIKAL R. POMPA 0.60


PEKERJAAN PLUMBING
2.14 Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 2 inc. 0.03
2.15 Pompa Air Bersih 0.57
Pompa Transfer include panel, cable & accessories
Type : Centrifugal Endsuction
Capacity : 150 liter/menit
Head : 20 m

III PEKERJAAN MEKANIKAL & ELEKTRIKAL R. PANEL 1.59


PEKERJAAN PANEL
3.1 Biaya Penyambungan PLN 1.15
3.2 LVMDP 0.37
PEKERJAAN INSTALASI KABEL FEEDER
3.3 Kabel Feeder dari LVMDP ke :
Panel PP - GWT & R. POMPA NYFGbY 4 x 10 mm2 0.02
Kwh Meter R. PANEL NYFGbY 3 x 2,5 mm2 0.01
Kwh Meter POS JAGA NYFGbY 3 x 2,5 mm2 0.01
PEKERJAAN MEP R.PANEL
3.4 TL LED 1x18 W (V-SHAPE) 0.00
3.5 Saklar tunggal 0.00
3.6 Kotak Kontak 0.00
3.7 Instalansi Penerangan 0.00
3.8 Instalansi Kotak Kontak 0.01
3.9 kWh Meter 1 PH (incl. Box MCB & Accesories) 0.01
PEKERJAAN PLUMBING
3.10 Pipa air hujan (PVC class 10 kg/cm2, incl. accessories)
PVC ø 4 inc. 0.01
Roof Drain ø 4 inc. 0.00

IV PEKERJAAN POS JAGA


PEKERJAAN POS JAGA 0.00

V PEKERJAAN GROUNDTANK & RUMAH POMPA


I PEKERJAAN GROUNDTANK 0.00
II PEKERJAAN RUMAH POMPA 0.00
VI PEKERJAAN RUMAH PANEL
I PEKERJAAN RUMAH PANEL 0.41
PEKERJAAN PERSIAPAN
1 Pekerjaan Pengukuran/bouwplank 0.01
PEKERJAAN GALIAN TANAH & URUGAN PASIR
PEKERJAAN GALIAN TANAH & URUGAN PASIR
1 Pek. Galian Tanah Pondasi batu belah Menerus 0.00
2 Pek. Galian Tanah Pondasi batu belah Setempat 0.00
3 Pek. Urugan Tanah Kembali bks Galian Pondasi 0.00
PEKERJAAN PONDASI
2 Pek. Pondasi Batu Belah Menerus camp. 1Pc : 3Psr 0.03
3 Pek. Pondasi Batu Belah Setempat camp. 1Pc : 3Psr 0.01
4 Pek. Urugan Pasir Urug Bawah Pondasi Batu Belah Menerus t=10cm 0.00
5 Pek. Urugan Pasir Urug Bawah Pondasi Batu Belah Setempat t=10cm 0.00
PEKERJAAN BETON
1 Pek. Beton Sloof 15/20, K-225 ( tul.144,88 kg/m3besi+bekisting) 0.02
2 Pek. Beton Kolom Praktis 15/15, K-225 (tul.181,81 kg/m3besi+bekisting) 0.01
4 Pek. Beton Ring Balok 15/20, K-225 ( tul.186,21 kg/m3besi+bekisting) 0.01
PEKERJAAN BETON LANTAI DAN DAK
1 Pek. Beton Plat Dak t= 10 cm, K-250 ( tul.79,68 kg/m3besi+bekisting) 0.05
2 Pek. Beton Kanopi t= 10 cm, K-250 ( tul.79,68 kg/m3besi+bekisting) 0.01
3 Pek. Beton Lantai Kerja K-175 0.01
4 Pek. Beton Plat Lantai t= 10 cm, K-250 ( tul.79,68 kg/m3besi+bekisting) 0.03
PEK. DINDING, PLESTERAN DAN ACIAN
1 Pasangan dinding Bata Merah Kls. 1, 1/2 campr 1 : 5 0.05
2 Pekerjaan plesteran dinding 1 : 5 0.03
3 Pekerjaan acian dinding dan Plafond Expose Beton 0.03
PEK. KUSEN, DAUN PINTU DAN DAUN JENDELA ALUMUNIUM
1 Pek. Pas. Kusen & Pintu Besi (Lkp engsel,kunci dan assr) 0.07
2 Pek. Pas. Kusen Type L3 0.02
PEK. PENGECATAN
1 Pekerjaan Pengecatan Dinding Interior, sek. Vinilex 0.01
2 Pekerjaan pengecatan dinding Exterior, sek. Vinilex 0.01
3 Pekerjaan pengecatan Plafond Beton Ekspos, sek. Vinilex 0.00
4 Pek. Laburan Waterproofing Cementitious Dak Beton, sek. Sika 0.01

JUMLAH PROSENTASE 100.00


RENCANA KEMAJUAN PEKERJAAN 0.018 0.002 0.002 0.002 0.002 0.018 0.002 0.002
KUMULATIF RENCANA KEMAJUAN PEKERJAAN 0.00 0.018 0.020 0.022 0.024 0.026 0.044 0.046 0.048
REALISASI KEMAJUAN PEKERJAAN
REALISASI KUMULATIF KEMAJUAN PEKERJAAN 0.000 0.000

PT. ...................... 0.026


September
3 4 5
18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.016 0.016 0.016

0.000 0.000 0.000


0.000 0.000 0.000

0.000 0.000 0.000

0.001 0.001 0.001


0.001 0.001 0.001
0.002 0.002 0.002
0.002 0.002 0.002
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000

0.001 0.001 0.001


0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.002 0.002 0.002
0.002 0.002 0.002
0.001 0.001 0.001
0.001 0.001 0.001
0.000 0.000 0.000

0.032 0.032 0.032 0.032


0.004 0.004 0.004 0.004
0.011 0.011 0.011 0.011
0.011 0.011 0.011 0.011
0.007 0.007 0.007 0.007
0.204 0.204 0.204 0.204
0.053 0.053 0.053 0.053
0.028 0.028 0.028 0.028
0.014 0.014 0.014 0.014
0.100 0.100 0.100 0.100
0.010 0.010 0.010 0.010
0.123
0.060
0.036
0.017
0.010
0.292 0.292 0.292 0.292 0.292 0.292 0.292 0.478 0.478 0.478 0.478

0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137
0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097
0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059

0.157 0.157 0.157 0.157


0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002
0.006 0.006 0.006 0.006
0.009 0.009 0.009 0.009
0.011 0.011 0.011 0.011
0.008 0.008 0.008 0.008

0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000


0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001


0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000


0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001


0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001


0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001


0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000

0.002 0.002 0.002 0.002 0.018 0.002 0.002 0.002 0.002 0.002 0.002 0.311 0.294 0.294 0.294 0.294 0.294 0.294 0.742 0.725 0.725 0.849
0.049 0.051 0.053 0.055 0.073 0.075 0.077 0.079 0.081 0.082 0.084 0.395 0.689 0.983 1.277 1.572 1.866 2.160 2.902 3.627 4.353 5.201

0.000 0.000 0.000

0.029
TIME SCHEDUL

REVITALISASI PASAR RAKYAT LE


KABUPATEN GAR

TAHUN ANGGARAN

Oktober
6 7 8
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.016 0.016 0.016

0.000 0.000 0.000


0.000 0.000 0.000

0.000 0.000 0.000

0.001 0.001 0.001


0.001 0.001 0.001
0.002 0.002 0.002
0.002 0.002 0.002
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000

0.001 0.001 0.001


0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.002 0.002 0.002
0.002 0.002 0.002
0.001 0.001 0.001
0.001 0.001 0.001
0.000 0.000 0.000

0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204 0.204
0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053
0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028
0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123 0.123
0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060
0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036
0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185 0.185
0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038
0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015
0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017
0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.598 0.598 0.598 0.598 0.598 0.598 0.598 0.598 0.598 0.598 0.598 0.598
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.174 0.174 0.174 0.174 0.174 0.174 0.174 0.174 0.174 0.174 0.174 0.174
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.254 0.254 0.254 0.254 0.254 0.254 0.254 0.254 0.254 0.254 0.254 0.254
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478 0.478

0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137 0.137
0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097
0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059

0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011

0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504

0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127
0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089
0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055

0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.111 0.111 0.111 0.111 0.111 0.111

0.049 0.049 0.049 0.049 0.049 0.049


0.035 0.035 0.035 0.035 0.035 0.035
0.027 0.027 0.027 0.027 0.027 0.027

0.271 0.271 0.271 0.271 0.271

0.005 0.005 0.005 0.005 0.005


0.052 0.052 0.052 0.052 0.052

0.008 0.008 0.008 0.008 0.008

0.002 0.002 0.002 0.002 0.002


0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001

0.029 0.029 0.029 0.029 0.029


0.024 0.024 0.024 0.024 0.024
0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000

0.010 0.010 0.010 0.010 0.010


0.006 0.006 0.006 0.006 0.006
0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003
0.025 0.025 0.025 0.025 0.025
0.031 0.031 0.031 0.031 0.031

0.001 0.001 0.001 0.001 0.001


0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000


0.002 0.002 0.002 0.002 0.002
0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001


0.004 0.004 0.004 0.004 0.004
0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001

0.000 0.000 0.000 0.000 0.000


0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000


0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001

0.004 0.004 0.004 0.004 0.004


0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003
0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001

0.000 0.000 0.000 0.000 0.000


0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000


0.000 0.000 0.000 0.000 0.000
0.014 0.014 0.014 0.014 0.014
0.000 0.000 0.000 0.000 0.000
0.004 0.004 0.004 0.004 0.004
0.007 0.007 0.007 0.007 0.007
0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015
0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015
0.020 0.020 0.020 0.020 0.020
0.014 0.014 0.014 0.014 0.014
0.001 0.001 0.001 0.001 0.001
0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.849 0.849 0.849 1.322 1.305 1.305 1.305 1.305 1.305 1.305 2.167 2.150 2.150 2.150 2.150 2.150 2.262 2.332 2.316 2.316 2.193 2.193
6.050 6.899 7.747 9.069 10.375 11.680 12.985 14.291 15.596 16.902 19.068 21.219 23.369 25.519 27.669 29.820 32.081 34.414 36.729 39.045 41.238 43.431

0.000 0.000 0.000


CHEDULE

AKYAT LELES (LANJUTAN)


TEN GARUT

GGARAN 2019

TAHUN 2019
November
9 10 11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.016 0.016 0.016

0.000 0.000 0.000


0.000 0.000 0.000

0.000 0.000 0.000

0.001 0.001 0.001


0.001 0.001 0.001
0.002 0.002 0.002
0.002 0.002 0.002
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000

0.001 0.001 0.001


0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.002 0.002 0.002
0.002 0.002 0.002
0.001 0.001 0.001
0.001 0.001 0.001
0.000 0.000 0.000

0.185 0.185
0.038 0.038
0.015 0.015
0.080 0.080
0.006 0.006
0.017 0.017
0.024 0.024
0.005 0.005
0.598 0.598
0.007 0.007
0.010 0.010
0.027 0.027
0.018 0.018
0.009 0.009
0.005 0.005
0.003 0.003
0.174 0.174
0.000 0.000
0.001 0.001
0.013 0.013
0.028 0.028
0.008 0.008
0.002 0.002
0.007 0.007
0.254 0.254
0.003 0.003
0.005 0.005
0.003 0.003
0.013 0.013
0.007 0.007

0.478 0.478 0.511 0.511 0.511 0.511 0.511 0.511 0.511 0.074 0.074 0.074 0.074 0.074 0.177 0.177 0.108 0.000 0.000 0.000 0.000 0.000

0.137 0.137
0.097 0.097
0.059 0.059

0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157


0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011

0.169 0.169 0.169 0.169 0.169 0.169 0.169


0.012 0.012 0.012 0.012 0.012 0.012 0.012
0.075 0.075 0.075 0.075 0.075 0.075 0.075
0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.004 0.004 0.004 0.004 0.004


0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001

0.027 0.027 0.027


0.050 0.050 0.050
0.031 0.031 0.031

0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.233 0.233 0.233 0.233 0.233 0.233 0.233 0.273 0.273 0.273 0.273 0.273 0.076

0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127 0.127


0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089
0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055 0.055

0.175 0.175 0.175 0.175 0.175


0.017 0.017 0.017 0.017 0.017
0.004 0.004 0.004 0.004 0.004
0.001 0.001 0.001 0.001 0.001

0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197 0.197
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.002 0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003 0.003

0.005 0.005 0.005 0.005 0.005 0.005


0.010 0.010 0.010 0.010 0.010 0.010
0.001 0.001 0.001 0.001 0.001 0.001
0.016 0.016 0.016 0.016 0.016 0.016
0.018 0.018 0.018 0.018 0.018 0.018
0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001


0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000

0.011 0.011 0.011 0.011 0.011 0.011


0.007 0.007 0.007 0.007 0.007 0.007

0.111 0.111 0.111 0.111 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109

0.049 0.049 0.049 0.049


0.035 0.035 0.035 0.035
0.027 0.027 0.027 0.027

0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017

0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006

0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271

0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052

0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029
0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259 0.259

0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047

0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030
0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023
0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014

0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015


0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015
0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020
0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.129 0.129 0.129 0.129

0.035 0.035 0.035 0.035


0.025 0.025 0.025 0.025
0.013 0.013 0.013 0.013

0.006 0.006 0.006 0.006


0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003

0.033 0.033 0.033 0.033


0.002 0.002 0.002 0.002

0.000 0.000 0.000 0.000


0.004 0.004 0.004 0.004
0.000 0.000 0.000 0.000

0.002 0.002 0.002 0.002


0.004 0.004 0.004 0.004

0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

2.452 2.452 1.816 1.799 1.833 1.833 1.833 1.833 1.833 1.167 1.151 1.151 1.151 1.151 1.144 1.144 1.131 1.008 1.137 1.137 1.137 0.940
45.882 48.334 50.150 51.949 53.782 55.616 57.449 59.283 61.116 62.284 63.435 64.586 65.737 66.888 68.032 69.176 70.308 71.315 72.452 73.589 74.725 75.665

0.000 0.000 0.000


Desembe
12 13 14
23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.016 0.016 0.016

0.000 0.000 0.000


0.000 0.000 0.000

0.000 0.000 0.000

0.001 0.001 0.001


0.001 0.001 0.001
0.002 0.002 0.002
0.002 0.002 0.002
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000

0.001 0.001 0.001


0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.002 0.002 0.002
0.002 0.002 0.002
0.001 0.001 0.001
0.001 0.001 0.001
0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.076 0.076 0.076 0.076 0.076 0.076 0.076 0.076

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002


0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005


0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001


0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011


0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.271

0.005
0.052

0.008

0.002
0.001
0.001
0.002
0.001

0.029
0.024
0.000
0.000

0.010
0.006
0.000
0.001
0.000
0.003
0.025
0.031

0.001
0.001
0.001
0.000
0.001
0.000

0.000
0.002
0.004

0.001
0.004
0.003
0.001

0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.003
0.000
0.001

0.004
0.000
0.002
0.003
0.003
0.002
0.003
0.001
0.001

0.000
0.000

0.000
0.000
0.014
0.000
0.004
0.007

0.259 0.259 0.259 0.259 0.259 0.259

0.005 0.005 0.005 0.005 0.005 0.005


0.047 0.047 0.047 0.047 0.047 0.047

0.008 0.008 0.008 0.008 0.008 0.008

0.002 0.002 0.002 0.002 0.002 0.002


0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001

0.030 0.030 0.030 0.030 0.030 0.030


0.025 0.025 0.025 0.025 0.025 0.025
0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000

0.009 0.009 0.009 0.009 0.009 0.009


0.006 0.006 0.006 0.006 0.006 0.006
0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002
0.023 0.023 0.023 0.023 0.023 0.023
0.028 0.028 0.028 0.028 0.028 0.028

0.001 0.001 0.001 0.001 0.001 0.001


0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000


0.002 0.002 0.002 0.002 0.002 0.002
0.004 0.004 0.004 0.004 0.004 0.004

0.001 0.001 0.001 0.001 0.001 0.001


0.004 0.004 0.004 0.004 0.004 0.004
0.003 0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000


0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001

0.003 0.003 0.003 0.003 0.003 0.003


0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001

0.002 0.002 0.002 0.002 0.002 0.002


0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000


0.000 0.000 0.000 0.000 0.000 0.000
0.014 0.014 0.014 0.014 0.014 0.014
0.000 0.000 0.000 0.000 0.000 0.000
0.004 0.004 0.004 0.004 0.004 0.004
0.007 0.007 0.007 0.007 0.007 0.007

0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014

0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.020
0.014
0.001
0.003
0.001
0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023 0.023
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047
0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047
0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129

0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035
0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013

0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131
0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057
0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048

0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046

0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.008

0.000

0.000
0.000
0.000

0.001
0.000
0.000
0.000

0.000
0.000
0.000

0.001
0.000
0.000
0.001

0.001
0.001
0.001

0.001
0.000
0.000
0.000
0.000
0.000

0.940 0.763 0.747 0.747 0.747 0.747 0.488 0.488 0.721 0.705 0.668 0.668 0.668 0.668 0.668 0.587 0.571 0.571 0.571 0.571 0.571 0.571
76.606 77.369 78.115 78.862 79.609 80.356 80.843 81.331 82.052 82.757 83.425 84.093 84.762 85.430 86.099 86.686 87.257 87.828 88.398 88.969 89.540 90.111

0.000 0.000 0.000

Garut, 13 Sep
Dibuat
PT. RAYNA DOM

ENI GINARS
Dire
Desember Januari
15 16 17 18
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.016 0.016 0.016 0.016

0.000 0.000 0.000 0.000


0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001


0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001


0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.047 0.047 0.047 0.047 0.047 0.047 0.047
0.047 0.047 0.047 0.047 0.047 0.047 0.047
0.069 0.069 0.069 0.069 0.069 0.069 0.069
0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.039 0.039 0.039 0.039 0.039 0.039 0.039
0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129

0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035
0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013

0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131
0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057 0.057
0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048

0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041

0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046

0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.587 0.571 0.571 0.571 0.571 0.571 0.571 0.471 0.454 0.454 0.440 0.440 0.440 0.440 0.327 0.311 0.311 0.311 0.311 0.311 0.311 0.192
90.698 91.269 91.840 92.411 92.982 93.553 94.124 94.594 95.049 95.503 95.943 96.383 96.823 97.263 97.590 97.901 98.212 98.523 98.834 99.145 99.456 99.648

0.000 0.000 0.000 0

t, 13 September 2019
Dibuat oleh,
NA DOMINIQUE ZALIKA

GINARSIH ERMAYA
Direktur
Januari

6 7

0.002 0.002
0.000 0.000
0.000 0.000
0.001 0.001
0.131 0.131
0.066 0.066
0.013 0.013
0.009 0.009
0.012 0.012
0.004 0.004
0.001 0.001
0.019 0.019
0.002 0.002
0.002 0.002
0.001 0.001
0.001 0.001
0.043 0.043

0.002 0.002
0.041 0.041
0.176 0.176
99.824 100.00
106
RINGKASAN HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN PASAR LELES KAB. GARUT
TAHUN 2019

NO. URAIAN HSP (Rp)

A PEKERJAAN PERSIAPAN
1 1 m1 Pek. pengukuran dan pemasangan Bowplank 46,000.00
2 Pek. Bongkaran Bangunan Eksisting termasuk Buangan Brangkal 80,000,000.00
3 Pek. Dewatering 75,000,000.00
4 Mobilisasi & Demobilisasi 25,000,000.00
5 Pembersihan Lahan 10,580,400.00

B PEKERJAAN GALIAN DAN URUGAN


1 Menggali 1 m3 tanah biasa sedalam 1 meter 77,200.00
2 Menggali 1 m3 tanah biasa sedalam > 2 meter 94,500.00
3 Menggali 1 m3 tanah biasa sedalam > 2 meter dengan alat berat 234,700.00
4 Mengebor 1 m1 Ø 50 cm 163,000.00
5 Mengurug 1 m3 pasir urug 226,000.00
6 Mengurug 1m3 Urugan tanah kembali 18,100.00
7 Pembuangan Tanah 41,800.00

C PEKERJAAN PONDASI
1 Memasang 1m3 pondasi batu belah,campuran 1PC : 3PP 773,000.00

D PEKERJAAN BESI DAN BETON


1 Membuat 1 m3 beton Tumbuk 584,700.00
2 Membuat 1 m3 beton K 175 674,000.00
3 Membuat 1 m3 Cor Beton Ready Mix K 250 1,109,000.00
4 Membuat 1 m3 Cor Beton Ready Mix K 300 1,220,000.00
5 Pembesian 1 kg dengan besi atau besi ulir 1,109,000.00
6 Pembesian 1 kg dengan besi atau besi polos 10,900.00

E PEKERJAAN BEKISTING
1 Memasang 1 m2 Bekisting Pondasi 60,500.00
2 Memasang 1m2 Bekisting untuk Sloof/Tie beam 2X pakai 67,500.00
3 Memasang 1m2 Bekisting untuk Kolom 2X pakai 151,200.00
4 Memasang 1m2 bekisting untuk balok 2X pakai 138,750.00
5 Memasang 1m2 bekisting untuk plat lantai 2X pakai 165,800.00
6 Memasang 1m2 bekisting untuk tangga 158,850.00

F PEKERJAAN BETON
1 Membuat 1 m3 beton bertulang Pondasi Strauss Pile Ø 50 cm (tuL.83,62 kg/m3 besi + bekisting) 2,258,000.00
2 Membuat 1 m3 beton bertulang Pur Beton P1 250x250x75 cm (tuL.27,38 kg/m3 besi + bekisting) 2,011,000.00
3 Membuat 1 m3 beton bertulang Pur Beton P2 250x250x75 cm (tuL.27,38 kg/m3 besi + bekisting) 2,232,000.00
4 Membuat 1 m3 beton bertulang Pur Beton P3 250x100x75 cm (tuL.245,53 kg/m3 besi + bekisting) 4,495,000.00
5 Membuat 1 m3 beton bertulang Pur Beton P4 120x120x25 cm (tuL.160,82 kg/m3 besi + bekisting) 3,215,100.00
6 Membuat 1 m3 beton bertulang Pedestal 40x25x40 cm (tuL.88,06 kg/m3 besi + bekisting) 2,669,000.00
7 Membuat 1 m3 beton bertulang Sloof 15/20 (tuL.144,88 kg/m3 besi + bekisting) 3,587,000.00
8 Membuat 1 m3 beton bertulang Tie Beam TB1 30/60 (tuL.162,84 kg/m3 besi + bekisting) 3,159,100.00
9 Membuat 1 m3 beton bertulang Tie Beam TB2 25/45 (tuL.233,44 kg/m3 besi + bekisting) 4,101,000.00
11 Membuat 1 m3 beton bertulang Kolom Praktis 15/15 (tuL.261,093 kg/m3 besi + bekisting) 3,541,100.00
12 Membuat 1 m3 beton bertulang Kolom K1 45/45 (tuL.217,35 kg/m3 besi + bekisting) 4,329,200.00
13 Membuat 1 m3 beton bertulang Kolom K2 35/45 (tuL. 266,19 kg/m3 besi + bekisting) 2,604,000.00
14 Membuat 1 m3 beton bertulang Kolom K3 35/45 (tuL. 266,19 kg/m3 besi + bekisting) 5,426,000.00
15 Membuat 1 m3 beton bertulang Kolom Bulat Ø 45 cm (tuL.161,39 kg/m3 besi + bekisting) 5,067,800.00
16 Membuat 1 m3 beton bertulang Ring Balok 15/20 (tuL.144,88 kg/m3 besi + bekisting) 3,850,600.00
17 Membuat 1 m3 beton bertulang Balok Struktur B1a 30/60 (tul.105,46 kg/m3 besi + bekisting) 2,264,000.00
18 Membuat 1 m3 beton bertulang Balok Struktur B1b 30/60 (tul.171,11 kg/m3 besi + bekisting) 2,264,000.00
19 Membuat 1 m3 beton bertulang Balok Struktur B1c 30/60 (tul.105,46 kg/m3 besi + bekisting) 3,153,100.00
19 Membuat 1 m3 beton bertulang Balok Struktur B2 25/45 (tul.220,3 kg/m3 besi + bekisting) 2,525,600.00
20 Membuat 1 m3 beton bertulang Balok Struktur B3 25/45 (tul.206,27 kg/m3 besi + bekisting) 2,525,600.00
21 Membuat 1 m3 beton bertulang Balok Struktur B4 45/60 (tul.156,67 kg/m3 besi + bekisting) 3,850,700.00
22 Membuat 1 m3 beton bertulang Balok 15/60 (tuL.144,88 kg/m3 besi + bekisting) 4,107,000.00
23 Membuat 1 m3 beton bertulang Plat tangga (tu.184,06 kg besi + bekisting) 2,788,300.00
24 Membuat 1 m3 beton bertulang Plat Lantai Basement t= 15 cm (tul. 140,39 kg/m3 besi + bekisting) 3,144,700.00
25 Membuat 1 m3 beton bertulang Plat Lantai t= 12-15 cm (tul. 140,39 kg/m3 besi + bekisting) 2,494,000.00
26 Membuat 1 m3 beton bertulang Plat Atap / Dak t= 10-12 cm (tul. 79,68 kg/m3 besi + bekisting) 3,362,800.00

HSP Page 106


107

NO. URAIAN HSP (Rp)


27 Membuat 1 m3 beton bertulang Plat Lantai Ramp t= 15 cm (tul. 79,68 kg/m3 besi + bekisting) 2,483,000.00

HSP Page 107


108

NO. URAIAN HSP (Rp)


28 Membuat 1 m3 beton bertulang Dinding Lantai Basement t= 15-20cm, (tul. 79,68 kg/m3 besi + bekisting) 3,362,800.00
29 Membuat 1 m3 beton bertulang Meja Beton t = 8 cm (tul.65.83 kg/m3 besi + bekisting) 3,430,000.00
30 Membuat 1 m3 beton bertulang balok Lintel 10/10 (tul. 240 kg/m3 besi + bekisting) 1,708,900.00
31 Membuat 1 m3 beton bertulang Pondasi Plat 100x100x30 (tu.140,28 kg/m3 besi + bekisting) 2,100,000.00
32 Membuat 1 m3 beton bertulang Pondasi Plat 125x125x50 (tu.140,28 kg/m3 besi + bekisting) 2,650,800.00

G PEKERJAAN DINDING DAN PELAPIS DINDING


1 Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata,campuran spesi 1 PC : 3 PP 116,700.00
2 Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata,campuran spesi 1 PC : 5 PP 108,000.00
3 Memasang 1 m2 dinding Bata Roster Beton 40x20x15 151,000.00
4 Memasang 1 m2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm 42,000.00
5 Memasang 1 m2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm 38,100.00
6 Memasang 1 m2 Opening Kusen 28,000.00
7 Memasang 1 m2 Acian 29,800.00

H PEKERJAAN KONSTRUKSI BAJA DAN ALLUMUNIUM


1 Memasang 1 kg besi plat baja tebal 2 mm - 16mm 22,500.00
2 Mengerjakan 1 cm pengelasan dengan las listrik 1,600.00
3 Memasang 1 kg besi profil L/C/Lip Channel/Pipa Besi 20,000.00
4 Memasang 1 bh Angker Baud 31,000.00
5 Memasang 1 kg rangka kuda-kuda baja IWF 18,900.00
6 Memasang 1 kg Besi Beton Polos Ikat Angin/Trekstang 22,400.00
7 Memasang 1 m2 Floordeck t= 0,75 mm 13,600.00
8 Memasang 1 m2 pintu Rolling door 375,100.00
9 Memasang 1 m2 pintu Sliding Gate / Folding Gate besi 375,100.00
10 Memasang 1 m' Railing Tangga Besi Pipa 2" Finish Cat 172,000.00
11 Memasang 1 m' Pipa 6" Finish Cat 400,000.00
12 Memasang 1 m2 Alumunium Composite sek. Seven 435,500.00
13 Memasang 1 bh Huruf Tiga Dimensi 468,600.00
14 Memasang 1 bh Huruf Tiga Dimensi T 180 cm 908,600.00
15 Memasang 1 m2 Grill Plat Strip Besi 774,400.00
16 Memasang 1 m2 Atap Polycarbonat 407,000.00
17 Memasang 1 m2 Kisi-kisi Besi Hollow 60x20 t=1,2mm Finish Cat 512,700.00
18 Memasang 1 m' Railing Tangga Besi Hollow + Handrailing Pipa Besi Ø 2" 416,100.00
19 Memasang 1 m2 Cnc Plat Besi t = 2 mm Finish Cat 434,800.00

I PEKERJAAN KUSEN, PINTU, JENDELA, BV


1 Membuat 1 unit Pintu PVC KM/Wc 419,000.00
2 Membuat 1 unit Kusen & Pintu Allummunium Spanrel 685,000.00
3 Membuat 1 unit Kusen & Pintu Besi tipe L4 5,486,000.00
4 Memasang 1 Unit Daun Pintu Triplek 5 mm Lapis Double Plywood tipe D2 ( 2 Pintu ) 3,008,900.00
5 Memasang 1 Unit Daun Pintu Triplek 5 mm Lapis Double Plywood tipe D1 ( 1 Pintu ) 1,585,500.00
6 MEMASANG 1 UNIT KUSEN + DAUN PINTU KAYU DOUBLE TYPE D2 5,405,400.00
7 MEMASANG 1 UNIT KUSEN + DAUN PINTU KAYU DOUBLE TYPE D1 3,025,000.00
7 MEMASANG 1 UNIT JENDELA J1 642,400.00
8 MEMASANG 1 UNIT JENDELA J1 Dinding Exterior 3,165,000.00
9 MEMASANG 1 UNIT JENDELA J2 Dinding Exterior 5,179,000.00
10 MEMASANG 1 UNIT JENDELA J3 Dinding Exterior 2,857,900.00
11 MEMASANG 1 UNIT JENDELA J4 Dinding Exterior 835,000.00
12 MEMASANG 1 UNIT RD 1 2,892,800.00
13 MEMASANG 1 UNIT RD 2 2,791,300.00
14 MEMASANG 1 UNIT RD 3 2,385,000.00
15 MEMASANG 1 UNIT RD 4 2,233,000.00
16 MEMASANG 1 UNIT RD 5 1,877,700.00
17 MEMASANG 1 UNIT RD 6 1,725,500.00
18 MEMASANG 1 UNIT Bv1 1,464,000.00
19 MEMASANG 1 UNIT Bv2 779,500.00
20 MEMASANG 1 UNIT Bv3 422,000.00
20 MEMASANG 1 UNIT L1 545,200.00
22 MEMASANG 1 UNIT L3 888,000.00

J PEKERJAAN PLAFOND
1 Memasang 1 m2 Pasangan rangka langit - langit (60 X 60) cm besi hollow 26,000.00
2 Memasang 1 m2 Langit-langit GRC t = 4 mm 33,800.00
3 Memasang 1 m2 Langit-langit Gypsumboard 9 mm 41,700.00
4 Memasang 1 m' list plafond gypsum profil 31,000.00
5 Memasang 1 m' list plafond kayu profil 7,200.00

HSP Page 108


109

NO. URAIAN HSP (Rp)


K PEKERJAAN ATAP
1 Memasang 1 m' Nok Metal Zincallum t = 0,45 59,000.00
2 Memasang 1 m' Talang Metal Zincallum 190,000.00
3 Memasang 1 m2 atap metal zincallum 119,200.00
4 Memasang 1 bh Huruf 3 Dimensi Logam 163,300.00
5 Memasang 1 m2 Peredam Panas Atap 41,000.00
6 Memasang 1 m2 solarflat 119,200.00
7 Memasang 1 bh Roof drain STS Ø 3" 79,300.00

L PEKERJAAN PENGECATAN DAN LABURAN


1 1 m2 Pengecatan bidang Kayu baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup 45,100.00
2 1 m2 Pengecatan bidang Besi baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup 45,100.00
3 1 m2 Pengecatan dengan Duco 138,100.00
4 1 m2 Pengecatan Tembok baru 1 lapis cat dasar, 2 lapis cat penutup (EXTERIOR) 20,100.00
5 1 m2 Pengecatan Tembok baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup (INTERIOR) 18,300.00
6 1 m2 Pengecatan Plafond baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup 19,200.00
7 1 m2 Pelaburan kayu dengan melamic 126,100.00
8 1 m2 Laburan Floor Hardener 61,600.00
9 1 m2 Laburan Waterproofing Cementitious 62,000.00

M PEKERJAAN PENUTUP LANTAI


1 Memasang 1 m2 lantai keramik 40 x 40 cm 207,600.00
2 Memasang 1 m2 lantai keramik 20 x 20 cm 170,000.00
3 Memasang 1 m2 Dinding keramik 20 x 20 cm 181,200.00
4 Memasang 1 m1 Keramik Plint 10x30 cm 20,900.00

N PEKERJAAN KACA
1 Memasang 1 M2 pasang kaca polos , tebal 3 mm 123,000.00
2 Memasang 1 M2 pasang kaca Ryben , tebal 5 mm 123,000.00

O PEKERJAAN SANITAIR
1 Memasang I buah kloset jongkok sek Toto 761,475.00
2 Memasang I bh kran Ø 3/4" atau 1/2" Toto T23B13 152,000.00
3 Memasang I bh Floor drain STS Toto TX1BN 113,600.00

P PEKERJAAN SALURAN AIR DAN JALAN


1 Memasang 1 m2 Paving Blok t=8 cm Natural 148,800.00
2 Memasang 1 m1 Kansteen 49,000.00
3 Memasang 1 m1 Saluran Air Batu Belah tipe 1 502,200.00
4 Memasang 1 m1 Saluran Air Batu Belah tipe 2 + Decker Beton 815,000.00
5 Memasang 1 m1 Saluran Air Batu belah tipe 3 1,025,400.00
6 Memasang 1 m1 Saluran Gravel U 50 cm tipe 4 + Decker Beton 465,100.00
7 Memasang 1 m1 Saluran Gravel U 50 cm tipe 5 + Grill Plat Besi 2,837,200.00

Q PEKERJAAN PRASARANA LINGKUNGAN


1 Membuat 1 M2 Pagar Gerbang 499,700.00
2 Membuat 1 m1 Pagar Panel Beton Precast 633,800.00
3 Membuat 1 bh Tiang Pagar Panel Beton Precast 296,100.00
4 Tanaman rumput gajah ( termasuk Upah Tanam ) 15,000.00
5 Memasang 1 m1 Pagar Bata Finish Plester, Aci & Cat 466,200.00

R PEKERJAAN FONDASI TIANG PANCANG


1 m1 Pek. Fondasi Tiang Pancang Tipe Square 25 x 25 (16) 273,800.00

HSP Page 109


ANALISA HARGA SATUAN PEKERJAAN
BANGUNAN PASAR LELES KAB. GARUT TAHUN 2019

NO. KEBUTUHAN Sat. INDEKS

A. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PERSIAPAN


1 1 m1 Pek. pengukuran dan pemasangan Bowplank
Kayu Klas II & III M3 0.0120
Bahan Paku 5cm- 7cm Kg 0.0200
Kayu Papan 3/20 cm Klas II/Klas III M3 0.0070
Pekerja Oh 0.1000
Tukang Oh 0.1000
Tenaga Kepala Tukang Oh 0.0100
Mandor Oh 0.0050
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan

B. PENETAPAN INDEK HARGA SATUAN PEKERJAAN GALIAN & URUGAN


1 Menggali 1 m3 tanah biasa sedalam 1 meter
Tukang gali OH 0.7500
Tenaga Kerja
Mandor OH 0.0250
Jumlah
PPN 10%
Jumlah+PPN
Dibulatkan
2 Menggali 1 m3 tanah biasa sedalam > 2 meter
Tukang gali OH 0.9000
Tenaga Kerja
Mandor OH 0.0450
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
3 Menggali 1 m3 tanah biasa sedalam > 2 meter dengan alat berat
Alat Berat m3 1.0000
Tenaga Kerja
Alat Bantu ls 1.0000
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 Mengebor 1 m1 Ø 50 cm
Pekerja OH 1.0000
Tenaga Kerja Mandor OH 0.5000
Alat Bantu ls 1.0000
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Analisa Page 110
NO. KEBUTUHAN Sat. INDEKS

Dibulatkan
5 Mengurug 1 m3 pasir urug
Bahan Pasir Urug OH 1.2000
Tenaga Kerja Pekerja OH 0.3000
Mandor OH 0.0100
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
6 Mengurug 1m3 Urugan tanah kembali
Tenaga Pekerja OH 0.1920
Mandor OH 0.0190
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
7 Pembuangan Tanah
Tenaga Pekerja OH 0.5160
Mandor OH 0.0500
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan

C. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PONDASI


1 Memasang 1m3 pondasi batu belah,campuran 1PC : 3PP
Batu belah 15 cm/20 cm M³ 1.2000
Bahan Portland Cement Kg 202.0000
Pasir Pasang M³ 0.4850
Pekerja OH 1.5000
Tenaga Kerja Tukang batu OH 0.6000
Kepala tukang OH 0.0600
Mandor OH 0.0750
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
D. PENETAPAN INDEK HARGA SATUAN PEKERJAAN BETON
1 Membuat 1 m3 beton Tumbuk
Portland Cement Kg 175.0000
Bahan Pasir Beton m3 0.2000
KR (maksimum 30 mm) m3 0.4500
Pekerja OH 1.6500
Tenaga kerja Tukang OH 0.2500
kepala tukang OH 0.0250
Mandor OH 0.0800
Analisa Page 111
NO. KEBUTUHAN Sat. INDEKS

Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 Membuat 1 m3 beton K 175
Bahan Portland Cement Kg 210.0000
Pasir Beton m3 0.3000
KR maks. 30 mm m3 0.5000
Air Liter 215.0000
Pekerja OH 1.6500
Tenaga kerja Tukang OH 0.2750
Kepala tukang OH 0.0280
Mandor OH 0.0830
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
3 Membuat 1 m3 Cor Beton Ready Mix K 250
Beton Ready Mix K.250 m3 1.0000
Alat bantu m3 1.0000
1 LS
Tenaga kerja

Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 Membuat 1 m3 Cor Beton Ready Mix K 300
Beton Ready Mix K.300 m3 1.0000
Alat bantu m3 1.0000
1 LS
Tenaga kerja

Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5 Pembesian 1 kg dengan besi atau besi ulir
Bahan Besi beton( ulir ) Kg 1.0500
kawat beton Kg 0.0150
Tenaga kerja pekerja OH 0.0070
Tukang OH 0.0070
Kepala tukang OH 0.0070
Mandor OH 0.0003
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
6 Pembesian 1 kg dengan besi atau besi polos

Analisa Page 112


NO. KEBUTUHAN Sat. INDEKS

Bahan Besi beton Polos Kg 1.0500


kawat beton Kg 0.0150
Tenaga kerja pekerja OH 0.0070
Tukang OH 0.0070
Kepala tukang OH 0.0070
Mandor OH 0.0003
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
E. PENETAPAN INDEK HARGA SATUAN PEKERJAAN BEKISTING/CETAKAN BETON
PERANCAH MENGGUNAKAN KAYU 2 X PAKAI 2x pakai
1 Memasang 1 m2 Bekisting Pondasi
Bahan Kayu kelas lll M3 0.0300
Paku 5 cm- 10 cm Kg 0.3000

Pekerja OH 0.5200
Tenaga kerja Tukang OH 0.2600
Kepala tukang OH 0.0260
Mandor OH 0.0260
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan

2 Memasang 1m2 Bekisting untuk Sloof/Tie beam 2X pakai


Bahan Kayu kelas lll M3 0.0400
Paku 5 cm- 10 cm Kg 0.3000

Tenaga kerja Pekerja OH 0.5200


Tukang OH 0.2600
Kepala tukang OH 0.0260
Mandor OH 0.0260
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
3 Memasang 1m2 Bekisting untuk Kolom 2X pakai
Bahan Kayu kelas lll m3 0.0340
Paku 5 cm-12cm kg 0.4000
Balok kayu kelas lII m3 -
Plywood Tebal 9mm Lbr 0.3500
Stoowerk kayu kelas lII m3 0.0840
Tenaga kerja Pekerja OH 0.6600
Tukang OH 0.3300
Kepala tukang OH 0.0330

Analisa Page 113


NO. KEBUTUHAN Sat. INDEKS

Mandor OH 0.0330
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 Memasang 1m2 bekisting untuk balok 2X pakai
Bahan Kayu kelas lll m3 0.0340
Paku 5 cm-12cm kg 0.4000
Balok kayu kelas lII m3 0.0100
Plywood Tebal 9mm Lbr 0.3500
Perancah kayu kelas lII m3 0.0560
Tenaga kerja Pekerja OH 0.6600
Tukang OH 0.3300
Kepala tukang OH 0.0330
Mandor OH 0.0330
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5 Memasang 1m2 bekisting untuk plat lantai 2X pakai
Bahan Kayu kelas lll m3 0.0400
Paku 5 cm-12cm kg 0.4000
Balok kayu kelas llI m3 0.0150
Multipleks Tebal 9mm Lbr 0.3500
Perancah kayu kelas lII m3 0.0840
Tenaga kerja Pekerja OH 0.6600
Tukang OH 0.3300
Kepala tukang OH 0.0330
Mandor OH 0.0330
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
6 Memasang 1m2 bekisting untuk tangga
Kayu kelas lll m3 0.0300
Paku 5 cm-12cm kg 0.4000
Balok kayu kelas ll m3 0.0150
Multipleks Tebal 9mm Lbr 0.3500
Perancah kayu kelas lII m3 0.0840
Pekerja OH 0.6600
Tenaga kerja Tukang OH 0.3300
Kepala tukang OH 0.0330
Mandor OH 0.0330
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan

Analisa Page 114


NO. KEBUTUHAN Sat. INDEKS

F. PENETAPAN INDEK HARGA SATUAN PEKERJAAN BETON BERTULANG


1 Membuat 1 m3 beton bertulang Pondasi Strauss Pile Ø 50 cm (tuL.83,62 kg/m3 besi + bekisting)
Beton Mutu K-300 m3 1.0000
Besi Beton 16 D16mm kg 50.5600
Besi Beton Cincin 2Ø13mm-(spiral 75-150 mm) kg 33.0584
Buis Beton Ø 100 cm bh 1.0500
Jumlah
Dibulatkan
2 Membuat 1 m3 beton bertulang Pur Beton P1 250x250x75 cm (tuL.27,38 kg/m3 besi + bekisting)
Beton Mutu K-300 m3 1.0000
Besi Beton Memanjang D16mm-(300 )mm kg 26.8667
Besi Beton Memanjang D16mm-(300 )mm kg 44.2000
Bekisting Pondasi m2 0.2800
Jumlah
Dibulatkan
3 Membuat 1 m3 beton bertulang Pur Beton P2 250x250x75 cm (tuL.27,38 kg/m3 besi + bekisting)
Beton Mutu K-300 m3 1.0000
Besi Beton Memanjang D16mm-(300 )mm kg 44.2000
Besi Beton Memanjang D16mm-(300 )mm kg 47.6667
Bekisting Pondasi m2 0.1800
Jumlah
Dibulatkan
5 Membuat 1 m3 beton bertulang Pur Beton P3 250x100x75 cm (tuL.245,53 kg/m3 besi + bekisting)
Beton Mutu K-300 m3 1.0000
Besi Beton Memanjang D16mm-(300 )mm kg 122.7600
Besi Beton Memanjang D16mm-(300 )mm kg 122.7600
Bekisting Pondasi m2 9.9000
Jumlah
Dibulatkan
6 Membuat 1 m3 beton bertulang Pur Beton P4 120x120x25 cm (tuL.160,82 kg/m3 besi + bekisting)
Beton Mutu K-300 m3 1.0000
Besi Beton Memanjang D13mm-(150 )mm kg 80.4200
Besi Beton Memanjang D13mm-(150 )mm kg 80.4200
Bekisting Pondasi m2 4.0000
Jumlah
Dibulatkan
7 Membuat 1 m3 beton bertulang Pedestal 40x25x40 cm (tuL.88,06 kg/m3 besi + bekisting)
Beton Mutu K-250 m3 1.0000
Besi Beton 6Ø12mm-(150)mm kg 53.0400
Besi Beton Cincin Ø8mm-(150) mm kg 34.6600
Bekisting Pondasi m2 10.0000
Jumlah
Dibulatkan
8 Membuat 1 m3 beton bertulang Sloof 15/20 (tuL.144,88 kg/m3 besi + bekisting)
Beton Mutu K-250 m3 1.0000
Besi Beton 4 Ø10mm kg 82.5684

Analisa Page 115


NO. KEBUTUHAN Sat. INDEKS

Besi Beton Cincin Ø8mm-(150 s/d 200)mm kg 62.2216


Bekisting Sloof m2 13.3320
Jumlah
Dibulatkan
9 Membuat 1 m3 beton bertulang Tie Beam TB1 30/60 (tuL.162,84 kg/m3 besi + bekisting)
Beton Mutu K-250 m3 1.0000
Besi Beton 12D16mm kg 104.2800
Besi Beton 2D16mm kg 17.5300
Besi Beton Cincin Ø10mm-(150 s/d 200)mm kg 41.0260
Bekisting Sloof m2 4.6250
Jumlah
Dibulatkan
10 Membuat 1 m3 beton bertulang Tie Beam TB2 25/45 (tuL.233,44 kg/m3 besi + bekisting)
Beton Mutu K-250 m3 1.0000
Besi Beton 11D16mm kg 154.3300
Besi Beton 2D16mm kg 28.0600
Besi Beton Cincin Ø10mm-(150 s/d 200)mm kg 31.0520
Bekisting Sloof m2 9.8660
Jumlah
Dibulatkan
11 Membuat 1 m3 beton bertulang Kolom Praktis 15/15 (tuL.261,093 kg/m3 besi + bekisting)
Beton Mutu K - 175 m3 1.0000
Besi Beton 4Ø10mm kg 110.2200
Besi Beton Cincin Ø20mm-(100 s/d 200)mm kg 29.3600
Bekisting kolom m2 8.9000
Jumlah
Dibulatkan
12 Membuat 1 m3 beton bertulang Kolom K1 45/45 (tuL.217,35 kg/m3 besi + bekisting)
Beton Mutu K-300 m3 1.0000
Besi Beton 16D16mm kg 124.8400
Besi Beton Cincin D13mm-(100)mm kg 24.7500
Bekisting kolom m2 9.7800
Jumlah
Dibulatkan
13 Membuat 1 m3 beton bertulang Kolom K2 35/45 (tuL. 266,19 kg/m3 besi + bekisting)
Beton Mutu K-300 m3 1.0000
Besi Beton 16D16mm kg 160.5020
Besi Beton Cincin D13mm-(100)mm kg 98.3900
Bekisting kolom m2 9.1600
Jumlah
Dibulatkan
14 Membuat 1 m3 beton bertulang Kolom K3 35/45 (tuL. 266,19 kg/m3 besi + bekisting)
Beton Mutu K-300 m3 1.0000
Besi Beton 16D16mm kg 160.5020
Besi Beton Cincin D13mm-(100)mm kg 98.3900
Bekisting kolom m2 9.1600
Jumlah

Analisa Page 116


NO. KEBUTUHAN Sat. INDEKS

Dibulatkan
15 Membuat 1 m3 beton bertulang Kolom Bulat Ø 45 cm (tuL.161,39 kg/m3 besi + bekisting)
Beton Mutu K-300 m3 1.0000
Besi Beton 16D16mm kg 124.8800
Besi Beton Cincin D13mm-(100)mm kg 92.4700
Bekisting kolom m2 9.7800
Jumlah
Dibulatkan
16 Membuat 1 m3 beton bertulang Ring Balok 15/20 (tuL.144,88 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 4 Ø10mm kg 82.5684
Besi Beton Cincin Ø8mm-(150 s/d 200)mm kg 62.2216
Bekisting Balok m2 9.3240
Jumlah
Dibulatkan
17 Membuat 1 m3 beton bertulang Balok Struktur B1a 30/60 (tul.105,46 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 12D16mm kg 48.3480
Besi Beton 2D16mm kg 17.5380
Besi Beton Cincin D13mm-(125-250 )mm kg 15.6780
Bekisting Balok m2 8.3250
Jumlah
Dibulatkan
18 Membuat 1 m3 beton bertulang Balok Struktur B1b 30/60 (tul.171,11 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 11D16mm kg 96.4590
Besi Beton 4D16mm kg 35.0760
Besi Beton Cincin D13mm-(125-250 )mm kg 15.6780
Bekisting Balok m2 8.3250
Jumlah
Dibulatkan
19 Membuat 1 m3 beton bertulang Balok Struktur B1c 30/60 (tul.105,46 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 12D16mm kg 48.3480
Besi Beton 2D16mm kg 17.5380
Besi Beton Cincin D13mm-(125-250 )mm kg 15.6780
Bekisting Balok m2 8.3250
Jumlah
Dibulatkan
20 Membuat 1 m3 beton bertulang Balok Struktur B2 25/45 (tul.220,3 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 11D16mm kg 126.7400
kg
Besi Beton Cincin Ø10mm-(100 s/d 150)mm kg 79.5000
Bekisting Balok m2 10.2100
Jumlah
Dibulatkan

Analisa Page 117


NO. KEBUTUHAN Sat. INDEKS

21 Membuat 1 m3 beton bertulang Balok Struktur B3 25/45 (tul.206,27 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 11D16mm kg 154.3344
kg
Besi Beton Cincin Ø10mm-(100 s/d 150)mm kg 51.0540
Bekisting Balok m2 10.2100
Jumlah
Dibulatkan
22 Membuat 1 m3 beton bertulang Balok Struktur B4 45/60 (tul.156,67 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 15D16mm kg 87.6900
Besi Beton 6D16mm kg 35.0760
Besi Beton Cincin Ø10mm-(100 s/d 150)mm kg 51.0540
Bekisting Balok m2 6.1050
Jumlah
Dibulatkan
23 Membuat 1 m3 beton bertulang Balok 15/60 (tuL.144,88 kg/m3 besi + bekisting)
Beton Mutu K - 250 m3 1.0000
Besi Beton 4 Ø10mm kg 82.5684
Besi Beton 2 Ø13 mm kg 11.5741
Besi Beton Cincin Ø8mm-(150 s/d 200)mm kg 62.2216
Bekisting Balok m2 9.3240
Jumlah
Dibulatkan
24 Membuat 1 m3 beton bertulang Plat tangga (tu.184,06 kg besi + bekisting)
Beton Mutu K-250 m3 1.0000
Besi Beton Bawah Melintang Ø12MM-150 mm kg 66.8750
Besi Beton Bawah Memanjang Ø12MM-150 mm kg 59.0184
Besi Beton Atas Melintang Ø10MM-150 mm kg 46.2500
Besi Beton Atas Memanjang Ø10MM-150 mm kg 6.3825
Besi Beton Step melintang Ø8MM-150 mm kg 1.5800
Besi Beton Step memanjang Ø8MM-150 mm kg 3.9500
Bekisting Step Tangga m2 8.3333
Bekisting Plat Tangga m2 10.0000
Jumlah
Dibulatkan
25 Membuat 1 m3 beton bertulang Plat Lantai Basement t= 15 cm (tul. 140,39 kg/m3 besi + bekisting)
Beton Mutu K-250 m3 1.0000
Besi Beton Tul.melintang 2x Ø 10 mm-100 mm kg 82.5840
Besi Beton Tul.memanjang 2x Ø10 mm-150 mm kg 57.8090
Bekisting Lantai m2 8.3555
Jumlah
Dibulatkan
26 Membuat 1 m3 beton bertulang Plat Lantai t= 12-15 cm (tul. 140,39 kg/m3 besi + bekisting)
Beton Mutu K-250 m3 1.0000
Besi Beton Tul.melintang 2x Ø 10 mm-100 mm kg 82.5840
Besi Beton Tul.memanjang 2x Ø10 mm-150 mm kg 57.8090

Analisa Page 118


NO. KEBUTUHAN Sat. INDEKS

Bekisting Lantai m2 8.3555


Jumlah
Dibulatkan
27 Membuat 1 m3 beton bertulang Plat Atap / Dak t= 10-12 cm (tul. 79,68 kg/m3 besi + bekisting)
Beton Mutu K-250 m3 1.0000
Besi Beton Tul.melintang 2x Ø 10 mm-150 mm kg 39.8400
Besi Beton Tul.memanjang 2x Ø10 mm-150 mm kg 39.8400
Bekisting Lantai m2 8.3555
Jumlah
Dibulatkan
28 Membuat 1 m3 beton bertulang Plat Lantai Ramp t= 15 cm (tul. 79,68 kg/m3 besi + bekisting)
Beton Mutu K-250 m3 1.0000
Besi Beton Tul.melintang 2x Ø 10 mm-150 mm kg 39.8400
Besi Beton Tul.memanjang 2x Ø10 mm-150 mm kg 39.8400
Bekisting Lantai m2 8.3555
Jumlah
Dibulatkan
29 Membuat 1 m3 beton bertulang Dinding Lantai Basement t= 15-20cm, (tul. 79,68 kg/m3 besi + bekisting)
Beton Mutu K-250 m3 1.0000
Besi Beton Tul.melintang 2x Ø 10 mm-150 mm kg 39.8400
Besi Beton Tul.memanjang 2x Ø10 mm-150 mm kg 39.8400
Bekisting Lantai m2 8.3555
Jumlah
Dibulatkan
30 Membuat 1 m3 beton bertulang Meja Beton t = 8 cm (tul.65.83 kg/m3 besi + bekisting)
Beton Mutu K-175 m3 1.0000
Besi Beton Tul.melintang 2x Ø8mm-150 mm kg 65.8333
Bekisting Lantai m2 12.3000
Jumlah
Dibulatkan
31 Membuat 1 m3 beton bertulang balok Lintel 10/10 (tul. 240 kg/m3 besi + bekisting)
Beton Mutu K-175 m3 1.0000
Besi Beton 4 Ø 8mm kg 8.3333
Besi Beton Cincin Ø 8mm-(150 s/d 200)mm kg 0.6644
Bekisting Lintel m2 6.2500
Jumlah
Dibulatkan
32 Membuat 1 m3 beton bertulang Pondasi Plat 100x100x30 (tu.140,28 kg/m3 besi + bekisting)
Beton Mutu K- 250 m3 1.0000
Besi Beton 8 Ø16MM (Memanjang) kg 58.2667
Besi Beton 3 Ø16MM (Melintang) kg 10.4500
Bekisting Pondasi m2 4.0000
Jumlah
Dibulatkan
33 Membuat 1 m3 beton bertulang Pondasi Plat 125x125x50 (tu.140,28 kg/m3 besi + bekisting)
Beton Mutu K- 250 m3 1.0000
Besi Beton 9 Ø16MM (Memanjang) kg 52.9636
Analisa Page 119
NO. KEBUTUHAN Sat. INDEKS

Besi Beton 9 Ø16MM (Melintang) kg 52.9636


Bekisting Pondasi m2 6.4000
Jumlah
Dibulatkan
G. PENETAPAN INDEK HARGA SATUAN PEKERJAAN DINDING
1 Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata,campuran spesi 1 PC : 3 PP
Bata merah buah 70.0000
Bahan Portland Cement Kg 16.4750
Pasir Pasang m3 0.0455
Tenaga Kerja Pekerja OH 0.3000
Tukang batu OH 0.1000
Kepala Tukang OH 0.0100
Mandor OH 0.0150
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata,campuran spesi 1 PC : 5 PP
Bata merah buah 70.0000
Bahan Portland Cement Kg 9.6800
Pasir Pasang m3 0.0450
Tenaga Kerja Pekerja OH 0.3000
Tukang batu OH 0.1000
Kepala Tukang OH 0.0100
Mandor OH 0.0150
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
3 Memasang 1 m2 dinding Bata Roster Beton 40x20x15
Bata Roster Beton 40x20x15 m2 12.5000
Bahan Portland Cement Kg 9.6800
Pasir Pasang m3 0.0450
Pekerja OH 0.3000
Tenaga Kerja Tukang batu OH 0.1000
Kepala Tukang OH 0.0100
Mandor OH 0.0150
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 Memasang 1 m2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm
Semen Portland Kg 10.8000
Bahan Pasir Pasang M3 0.0260
Pekerja Oh 0.1000
Tenaga Kerja Tukang Batu Oh 0.1200

Analisa Page 120


NO. KEBUTUHAN Sat. INDEKS

Kepala Tukang Oh 0.0200


Mandor Oh 0.0125
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5 Memasang 1 m2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm
Bahan Semen Portland Kg 7.2900
Pasir Pasang M3 0.0280
Pekerja Oh 0.1000
Tenaga Kerja Tukang Batu Oh 0.1200
Kepala Tukang Batu Oh 0.0200
Mandor Oh 0.0125
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
6 Memasang 1 m2 Opening Kusen
Bahan Semen Portland Kg 4.0000
Pekerja Oh 0.1000
Tenaga Kerja Tukang Batu Oh 0.1200
Kepala Tukang Batu Oh 0.0200
Mandor Oh 0.0125
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
7 Memasang 1 m2 Acian
Bahan Semen Portland Kg 4.0000
Pekerja Oh 0.1430
Tenaga Kerja Tukang Batu Oh 0.1070
Kepala Tukang Batu Oh 0.0105
Mandor Oh 0.0100
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan

H. PENETAPAN INDEK HARGA SATUAN PEKERJAAN KONTRUKSI BAJA & ALUMINIUM


1 Memasang 1 kg besi plat baja tebal 2 mm - 16mm
Bahan Besi Plat Baja tebal 2 mm - 16 mm kg 1.0050
Kawat las kg 0.0500
Pekerja OH 0.0600
Tenaga Kerja Tukang las konstruksi OH 0.0600
Kepala Tukang OH 0.0060
Mandor OH 0.0060
Jumlah
Analisa Page 121
NO. KEBUTUHAN Sat. INDEKS

Keuntungan Max 10% 10%


Jumlah+keuntungan
Dibulatkan
2 Mengerjakan 1 cm pengelasan dengan las listrik
Kawat las listrik kg 0.0400
Bahan

Pekerja OH 0.0040
Tukang las konstruksi OH 0.0020
Tenaga Kerja
Kepala Tukang OH 0.0002
Mandor OH 0.0002

Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
3 Memasang 1 kg besi profil L/C/Lip Channel/Pipa Besi
Besi profil Kg 1.1500
Bahan
Kawat las listrik kg 0.0400
Pekerja OH 0.0400
Tukang las konstruksi OH 0.0400
Tenaga Kerja
Kepala Tukang OH 0.0040
Mandor OH 0.0020
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 Memasang 1 bh Angker Baud
Angker Baud Bh 1.0000
Bahan
Kawat las listrik kg 0.0400
Pekerja OH 0.0400
Tukang las konstruksi OH 0.0400
Tenaga Kerja
Kepala Tukang OH 0.0040
Mandor OH 0.0020
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5 Memasang 1 kg rangka kuda-kuda baja IWF
Besi baja IWF Kg 1.1500
Bahan
Kawat las listrik kg 0.0400
Pekerja OH 0.0400
Tenaga Kerja Tukang las konstruksi OH 0.0400
Kepala Tukang OH 0.0040
Mandor OH 0.0020
Jumlah
Keuntungan Max 10% 10%

Analisa Page 122


NO. KEBUTUHAN Sat. INDEKS

Jumlah+keuntungan
Dibulatkan
5a Erection 1 kg rangka kuda-kuda baja IWF
Besi baja IWF Kg 1.1500
Bahan
Kawat las listrik kg 0.0400
Pekerja OH 0.0200
Tenaga Kerja Tukang las konstruksi OH 0.0200
Kepala Tukang OH 0.0020
Mandor OH 0.0010
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
6 Memasang 1 kg Besi Beton Polos Ikat Angin/Trekstang
Bahan Besi Beton Polos Kg 1.1500
Kawat las listrik kg 0.0400
Pekerja OH 0.0600
Tukang las konstruksi OH 0.0600
Tenaga Kerja
Kepala Tukang OH 0.0060
Mandor OH 0.0030
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
7 Memasang 1 m2 Floordeck t= 0,75 mm
Bahan Plat Floordeck t= 0,75 mm Kg 1.0100
Kawat las listrik kg 0.0400
Pekerja OH 0.0600
Tukang las konstruksi OH 0.0600
Tenaga Kerja
Kepala Tukang OH 0.0060
Mandor OH 0.0030
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
8 Memasang 1 m2 pintu Rolling door
Bahan Pintu Rolling Door Plat Besi M2 1.0000
Pekerja OH 1.2000
Tenaga Kerja Tukang las biasa OH 1.2000
Kepala Tukang OH 0.1200
Mandor OH 0.0060
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
9 Memasang 1 m2 pintu Sliding Gate / Folding Gate besi
Bahan Pintu Sliding Gate / Folding Gate Besi M2 1.0000

Analisa Page 123


NO. KEBUTUHAN Sat. INDEKS

Pekerja OH 1.2000
Tenaga Kerja Tukang las biasa OH 1.2000
Kepala Tukang OH 0.1200
Mandor OH 0.0060
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
10 Memasang 1 m' Railing Tangga Besi Pipa 2" Finish Cat
Besi Pipa 2" kg 2.7200

Bahan Plat 10x10 mm Kg 0.2800


Asesoris ls 1.0000
Finishing Cat Besi m2 1.1000
Upah Pasang Pabrikasi Railling Tangga Ls 1.0000
Tenaga Kerja

Jumlah
Dibulatkan
10 Memasang 1 m' Pipa 6" Finish Cat
Besi Pipa 6" m' 1.1000

Bahan
Asesoris ls 1.0000
Finishing Cat Besi m2 0.0500
Upah Pasang Pabrikasi Ls 1.0000
Tenaga Kerja

Jumlah
Dibulatkan
11 Memasang 1 m2 Alumunium Composite sek. Seven
Alumunium Composite cm 1.1000
Besi hollow 20x60x1,4 mm kg 2.0800
Bahan
Besi hollow 20x40x1,4 mm Kg 3.5700
Asesoris 35% dr bahan ls 1.0000
Upah Pasang Ls 1.0000
Tenaga Kerja
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
12 Memasang 1 bh Huruf Tiga Dimensi
Huruf Plat Eisser t=0,8mm uk. 40x20x4 cm cm 80.0000
Cat Duco m2 0.6400
Bahan
Besi hollow 20x60x1,4 mm kg 2.0800
Besi hollow 20x40x1,4 mm Kg 3.5700
Upah Pasang Ls 1.0000
Tenaga Kerja
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
Memasang 1 bh Huruf Tiga Dimensi T 180 cm

Analisa Page 124


NO. KEBUTUHAN Sat. INDEKS

Huruf Plat Eisser t=1,8 m cm 180.0000


Cat Duco m2 0.6400
Besi hollow 20x60x1,4 mm kg 2.0800
Bahan Besi hollow 20x40x1,4 mm Kg 3.5700

Upah Pasang Ls 1.0000


0
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
13 Memasang 1 m2 Grill Plat Strip Besi
Plat Strip Besi 40.4 mm kg 49.6000
Bahan Plat Strip Besi 40.4 mm kg 10.8000
Kawat las kg 0.0500
Pekerja OH 1.0500
Tenaga Kerja Tukang OH 1.0500
Kepala Tukang OH 0.1050
Mandor OH 0.0520
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
14 Memasang 1 m2 Atap Polycarbonat
Atap Polyicarbonat m2 1.0000
Bahan Rangka Hollow kg 7.2000
Paku Sekrup bh 9.0000
Pekerja OH 0.5000
Tenaga Kerja Tukang OH 0.5000
Kepala Tukang OH 0.0050
Mandor OH 0.0300
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
15 Memasang 1 m2 Solarflat
Atap Solarflat m2 1.0000
Bahan Rangka Pipa m1 4.0000
Paku Sekrup bh 9.0000
Pekerja OH 0.5000
Tenaga Kerja Tukang OH 0.5000
Kepala Tukang OH 0.0050
Mandor OH 0.0300
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan

Analisa Page 125


NO. KEBUTUHAN Sat. INDEKS

15 Memasang 1 m2 Kisi-kisi Besi Hollow 60x20 t=1,2mm Finish Cat


Besi hollow 20x60x1,2 mm kg 2.7200
Besi hollow 20x40x1,2 mm Kg 4.6200
Bahan Plat 10x10 mm Kg 0.2800
Asesoris ls 1.0000
Finishing Cat Besi m2 1.1000
Upah Pasang Pabrikasi Railling Tangga Ls 1.0000
Tenaga Kerja

Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
15 Memasang 1 m2 Cnc Plat Besi t = 2 mm Finish Cat
Plat Besi Tbl 2 mm m2 1.0100
Asesoris ls 1.0000
Finishing Cat Besi m2 1.1000
Upah Ls 1.0000
Tenaga Kerja

Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan

I. PENETAPAN INDEK HARGA SATUAN PEKERJAAN KUSEN, PINTU, JENDELA, BV


1 Membuat 1 unit Pintu PVC KM/Wc
Kusen dan Pintu PVC unit 1.0000
Pekerja OH 0.4000
tenaga kerja Tukang OH 1.2000
kepala tukang OH
Mandor OH
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 Membuat 1 unit Kusen & Pintu Allummunium Spanrel
Kusen dan Pintu Spanrel unit 1.0000
Pekerja OH 0.4000
tenaga kerja Tukang OH 1.2000
kepala tukang OH
Mandor OH
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan

Analisa Page 126


NO. KEBUTUHAN Sat. INDEKS

Dibulatkan
3 Membuat 1 unit Kusen & Pintu Besi tipe L4
Kusen dan Pintu Besi unit 1.0000
Pekerja OH 0.4000
tenaga kerja Tukang OH 1.2000
kepala tukang OH
Mandor OH
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 Memasang 1 Unit Daun Pintu Triplek 5 mm Lapis Double Plywood tipe D2 ( 2 Pintu )
Frame Daun Pintu Papan Kayu kls. 1 M3 0.0768
Bahan Triplek lbr 4.0000
Plywood Lbr 4.0000
Kaca Polos Mati 5 mm M2 0.7200
List Alumunium 1 cm M1 19.2000
Lem Putih kayu kg 0.5000
Paku 1cm kg 0.1500
Finishing Melamik M2 8.0000
Pekerja Oh 0.7500
Tenaga Kerja Tukang Besi / Aluminium Oh 0.6000
Kepala Tukang Besi / Aluminium Oh 0.0600
Mandor Oh 0.0375
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 Memasang 1 Unit Daun Pintu Triplek 5 mm Lapis Double Plywood tipe D1 ( 1 Pintu )
Frame Daun Pintu Papan Kayu kls. 1 M3 0.0384
Bahan Triplek lbr 2.0000
Plywood Lbr 2.0000
Kaca Polos Mati 5 mm M2 0.3600
List Alumunium 1 cm M1 9.6000
Lem Putih kayu kg 0.5000
Paku 1cm kg 0.1500
Finishing Melamik M2 4.0000
Pekerja Oh 0.7500
Tenaga Kerja Tukang Besi / Aluminium Oh 0.6000
Kepala Tukang Besi / Aluminium Oh 0.0600
Mandor Oh 0.0375
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5 MEMASANG 1 UNIT KUSEN + DAUN PINTU KAYU DOUBLE TYPE D2
Bahan Kusen Aluminium Natural 4" M' 6.7000

Analisa Page 127


NO. KEBUTUHAN Sat. INDEKS

Asesoris Kusen Alumunium (35% dr bahan ) ls 1.0000


Daun Pintu Double Teakwood tipe D2 Unit 1.0000
Kunci Silinder dan Body untuk pintu Bh 1.0000
Handle Pintu Stainless Steel Psg 2.0000
Slot Pintu Tanam (Espanolate) Bh 2.0000
Engsel Pintu Psg 3.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000

Jumlah
Dibulatkan
6 MEMASANG 1 UNIT KUSEN + DAUN PINTU KAYU DOUBLE TYPE D1
Bahan Kusen Aluminium Natural 4" M' 4.4200
Asesoris Kusen Alumunium (35% dr bahan ) ls 1.0000
Daun Pintu Double Teakwood tipe D1 Unit 1.0000
Kunci Silinder dan Body untuk pintu Bh 1.0000
Handle Pintu Stainless Steel Psg 1.0000
Kaca Polos Mati 5 mm M2 0.3600
Engsel Pintu Psg 2.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000

Jumlah
Dibulatkan
7 MEMASANG 1 UNIT JENDELA J1
Bahan Kusen Aluminium Natural 4" Jendela M1 4.0000
Kaca Polos 5mm Jendela M2 0.8625
Asesoris Kusen Alumunium (35% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
8 MEMASANG 1 UNIT JENDELA J2
Bahan Kusen Aluminium Natural 4" Jendela M1 41.0000
Kaca Polos 5mm Jendela M2 14.0400
Kusen Aluminium Natural 4" Bv M1 46.3000
Kaca Polos 5mm Bv M2 2.1450
Asesoris Kusen Alumunium (35% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
8 MEMASANG 1 UNIT JENDELA J1 Dinding Exterior
Bahan Kusen Aluminium Natural 4" Jendela M1 11.5200
Kaca Polos 5mm Jendela M2 2.0400
Kusen Aluminium Natural 4" Bv M1 10.4000
Kaca Polos 5mm Bv M2

Analisa Page 128


NO. KEBUTUHAN Sat. INDEKS

Asesoris Kusen Alumunium (35% dr bahan ) Ls 1.0000


Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
8 MEMASANG 1 UNIT JENDELA J2 Dinding Exterior
Bahan Kusen Aluminium Natural 4" Jendela M1 19.2000
Kaca Polos 5mm Jendela M2 3.4000
Kusen Aluminium Natural 4" Bv M1 16.6000
Kaca Polos 5mm Bv M2
Asesoris Kusen Alumunium (35% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
15 MEMASANG 1 UNIT JENDELA J3 Dinding Exterior
Bahan Kusen Aluminium Natural 4" Jendela M1 16.8000
Kaca Polos 5mm Jendela M2 4.8300
Asesoris Kusen Alumunium (35% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
15 MEMASANG 1 UNIT JENDELA J4 Dinding Exterior
Bahan Kusen Aluminium Natural 4" Jendela M1 5.3400
Kaca Polos 5mm Jendela M2 0.9800
Asesoris Kusen Alumunium (35% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
9 MEMASANG 1 UNIT RD 1
Bahan Rolling Door M1 6.8400
Asesoris Kusen Alumunium (10% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
10 MEMASANG 1 UNIT RD 2
Bahan Rolling Door M1 6.6000
Asesoris Kusen Alumunium (10% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
11 MEMASANG 1 UNIT RD 3
Bahan Rolling Door M1 5.6400

Analisa Page 129


NO. KEBUTUHAN Sat. INDEKS

Asesoris Kusen Alumunium (10% dr bahan ) Ls 1.0000


Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
12 MEMASANG 1 UNIT RD 4
Bahan Rolling Door M1 5.2800
Asesoris Kusen Alumunium (10% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
13 MEMASANG 1 UNIT RD 5
Bahan Rolling Door M1 4.4400
Asesoris Kusen Alumunium (10% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
14 MEMASANG 1 UNIT RD 6
Bahan Rolling Door M1 4.0800
Asesoris Kusen Alumunium (10% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
15 MEMASANG 1 UNIT Bv1
Bahan Kusen Aluminium Natural 4" Jendela M1 9.4000
Kaca Polos 5mm Jendela M2 1.6800
Asesoris Kusen Alumunium (35% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
16 MEMASANG 1 UNIT Bv2
Bahan Kusen Aluminium Natural 4" Jendela M1 5.1000
Kaca Polos 5mm Jendela M2 0.8000
Asesoris Kusen Alumunium (35% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
17 MEMASANG 1 UNIT Bv3
Bahan Kusen Aluminium Natural 4" Jendela M1 2.8000
Kaca Polos 5mm Jendela M2 0.4000
Asesoris Kusen Alumunium (35% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000

Analisa Page 130


NO. KEBUTUHAN Sat. INDEKS

Alat Bantu Ls 1.0000


Jumlah
Dibulatkan
18 MEMASANG 1 UNIT L1
Bahan Kusen Aluminium Natural 4" Jendela M1 3.2000
Bilah Louvre M2 0.6400
Asesoris Kusen Alumunium (35% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
19 MEMASANG 1 UNIT L3
Bahan Kusen Aluminium Natural 4" Jendela M1 5.8000
Bilah Louvre M2 0.6400
Asesoris Kusen Alumunium (35% dr bahan ) Ls 1.0000
Tenaga Kerja Upah Pasang Ls 1.0000
Alat Bantu Ls 1.0000
Jumlah
Dibulatkan
20 Memasang 1 m' Railing Tangga Besi Hollow + Handrailing Pipa Besi Ø 2"
Besi hollow 20x60x1,4 mm kg 1.9200
Besi hollow 20x40x1,4 mm Kg 4.8000
Bahan Plat 10x10 mm Kg 0.5600
Handrail Pipa Besi Ø 2" Kg 4.1100
Finishing Cat Besi m2 1.1000

Upah Pasang Pabrikasi Railling Tangga Ls 1.0000


Tenaga Kerja

Jumlah
Dibulatkan
J. PENETAPAN INDEK HARGA SATUAN PEKERJAAN LANGIT-LANGIT
1 Memasang 1 m2 Pasangan rangka langit - langit (60 X 60) cm besi hollow
Besi Hollow 4 x 4 M' 1.1000
Bahan Gantungan Besi dia 6 Kg 0.2750
Assesories dan Alat Bantu ls 1.0000
Pekerja Oh 0.0200
Tenaga Kerja Tukang Oh 0.1000
Kepala Tukang Oh 0.0200
Mandor Oh 0.0020
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 Memasang 1 m2 Langit-langit GRC t = 4 mm
Bahan Pelat GRC tebal 4mm Lbr 0.3470

Analisa Page 131


NO. KEBUTUHAN Sat. INDEKS

Paku kg 0.0100
Pekerja Oh 0.0800
Tenaga Kerja Tukang kayu Oh 0.0400
Kepala tukang kayu Oh 0.0040
Mandor Oh 0.0040
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
3 Memasang 1 m2 Langit-langit Gypsumboard 9 mm
Pelat Gypsum Board Lbr 0.3640
Bahan Plaster Board Ls 1.0000
Paku Skrup kg 0.1100
Pekerja Oh 0.0800
Tenaga Kerja Tukang kayu Oh 0.0400
Kepala tukang kayu Oh 0.0040
Mandor Oh 0.0040
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 Memasang 1 m' list plafond gypsum profil
Bahan List gypsum profil m 1.0500
Tepung gypsum Kg 0.1500
Pekerja OH 0.0600
Tenaga Kerja Tukang kayu OH 0.0600
Kepala Tukang OH 0.0060
Mandor OH 0.0030
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5 Memasang 1 m' list plafond kayu profil
Bahan List kayu profil m 1.0500
Paku Kg 0.0500
Pekerja OH 0.0300
Tenaga Kerja Tukang kayu OH 0.0300
Kepala Tukang OH 0.0050
Mandor OH 0.0030
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan

K. PENETAPAN INDEK HARGA SATUAN PEKERJAAN ATAP


3 Memasang 1 m' Nok Metal Zincallum t = 0,45
Bahan Nok Metal Zincallum t = 0,45 M' 1.0000
Analisa Page 132
NO. KEBUTUHAN Sat. INDEKS

Assesories Ls 1.0000
Pekerja Oh -
Tenaga Kerja Tukang kayu Oh 0.2000
Kepala tukang kayu Oh -
Mandor Oh -
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
1 Memasang 1 m' Talang Metal Zincallum
Bahan Talang Metal Zincallum t= 0,8 mm m' 1.0500
Rangka L 50.50.5 kg 3.7500
Pekerja Oh 0.4000
Tenaga Kerja Tukang kayu Oh 0.2000
Kepala tukang kayu Oh 0.0200
Mandor Oh 0.0200
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 Memasang 1 m2 atap metal zincallum
Bahan Atap zincallum Gelombang t= 0,45 mm m2 1.1000
Skrup bh 4.0000
Pekerja Oh 0.1000
Tenaga Kerja Tukang kayu Oh 0.1000
Kepala tukang kayu Oh 0.0100
Mandor Oh 0.0100
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 Memasang 1 m2 solarflat
Bahan Atap Solarflat m2 1.1000
Skrup bh 4.0000
Pekerja Oh 0.1000
Tenaga Kerja Tukang kayu Oh 0.1000
Kepala tukang kayu Oh 0.0100
Mandor Oh 0.0100
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
3 Memasang 1 bh Roof drain STS Ø 3"
Bahan Roof drain Sts Ø 3" Bh 1.0000
Pekerja Oh 0.0100
Tenaga Kerja Tukang Batu Oh 0.1000
Kepala Tukang Batu Oh 0.0100
Mandor Oh 0.0050
Analisa Page 133
NO. KEBUTUHAN Sat. INDEKS

Jumlah
Dibulatkan
4 Memasang 1 bh Huruf 3 Dimensi Logam
Bahan Huruf Logam cm 30.0000
Asesoris Ls 1.0000
Pekerja Oh 0.1000
Tenaga Kerja Tukang Oh 0.1000
Kepala tukang kayu Oh -
Mandor Oh -
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5 Memasang 1 m2 Peredam Panas Atap
Bahan Allumunium Foil m2 1.0500
Glasswool kg 0.4500
Roofmesh m2 1.0500
Skrup bh 4.0000
Pekerja Oh 0.1000
Tenaga Kerja Tukang kayu Oh 0.1000
Kepala tukang kayu Oh 0.0100
Mandor Oh 0.0100
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
L. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PENGECATAN/LABURAN
1 1 m2 Pengecatan bidang Kayu baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Cat meni Kg 0.2000
Plamir Kg 0.1500
Bahan Cat dasar Kg 0.1700
Cat penutup Kg 0.2600
Ampelas Lbr 0.0100
Kwas 3" Bh 0.0500
Pekerja Oh 0.1000
Tenaga Kerja Tukang cat Oh 0.0180
Kepala tukang cat Oh 0.0120
Mandor Oh 0.0050
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 1 m2 Pengecatan bidang Besi baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Cat meni Kg 0.2000
Dempul Plastik Kg 0.1500
Bahan Cat dasar Kg 0.1700
Cat penutup Kg 0.2600
Ampelas Lbr 0.0100
Analisa Page 134
NO. KEBUTUHAN Sat. INDEKS

Kwas 3" Bh 0.0500


Pekerja Oh 0.1000
Tenaga Kerja Tukang cat Oh 0.0180
Kepala tukang cat Oh 0.0120
Mandor Oh 0.0050
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
3 1 m2 Pengecatan dengan Duco
Cat duco Kg 0.2500
Cat Dasar Epoxy Kg 0.2200
Dempul Duco Kg 0.2000
Tiner Ltr 1.3000
Ampelas Duco Lbr 4.0000
Alat Bantu dll Ls 1.0000
Pekerja Oh 0.3500
Tenaga Kerja Tukang cat Oh 0.2500
Kepala tukang cat Oh 0.0250
Mandor Oh 0.0025
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
3 1 m2 Pengecatan Tembok baru 1 lapis cat dasar, 2 lapis cat penutup (EXTERIOR)
Cat dasar Kg 0.2000
Bahan Cat penutup 2 x Vinilex Kg 0.2600
Ampelas Lbr 0.1000
Roll Cat Bh 0.0250
Pekerja Oh 0.0400
Tenaga Kerja Tukang cat Oh 0.0800
Kepala tukang cat Oh 0.0080
Mandor Oh 0.0050
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 1 m2 Pengecatan Tembok baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup (INTERIOR)
Plamir Kg 0.1000
Cat dasar Kg 0.1000
Bahan Cat penutup 2 x Kg 0.2600
Ampelas Lbr 0.1000
Roll Cat Bh 0.0250
Pekerja Oh 0.0400
Tenaga Kerja Tukang cat Oh 0.0800
Kepala tukang cat Oh 0.0080
Mandor Oh 0.0050

Analisa Page 135


NO. KEBUTUHAN Sat. INDEKS

Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
5 1 m2 Pengecatan Plafond baru 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Plamir Kg 0.0500
Cat dasar Kg 0.1000
Bahan Cat penutup 2 x Kg 0.2600
Ampelas Lbr 0.1000
Roll Cat Bh 0.0250
Pekerja Oh 0.0400
Tenaga Kerja Tukang cat Oh 0.0800
Kepala tukang cat Oh 0.0080
Mandor Oh 0.0050
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
6 1 m2 Pelaburan kayu dengan melamic
Wood Filler Kg 0.2500
Wood Stain Kg 0.2200
Melamin Sending Siller MSS 123 Kg 0.2000
Bahan ML 131 Clear Danagloss Kg 0.1800
Tiner Ltr 1.3000
Ampelas Lbr 4.0000
Kwas 3" Bh 0.5000
Alat Bantu dll Ls 1.0000
Pekerja Oh 0.3500
Tenaga Kerja Tukang cat Oh 0.2500
Kepala tukang cat Oh 0.0250
Mandor Oh 0.0025
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
7 1 m2 Laburan Floor Hardener
Bahan Semen Floor Hardener Kg 5.0000
Tenaga Kerja Pekerja Oh 0.0700
Tukang Batu Oh 0.1200
Jumlah
PPN 10%
Jumlah+PPN
Dibulatkan
8 1 m2 Laburan Waterproofing Cementitious
Waterproofimg Cementitious Kg 0.5000
Ampelas lbr 0.5000
Bahan Kwas 3" bh 0.0100
Pekerja Oh 0.0200
Tenaga Kerja Tukang cat Oh 0.2000
Kepala tukang cat Oh 0.0200
Analisa Page 136
NO. KEBUTUHAN Sat. INDEKS

Mandor Oh 0.0100
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan

M. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PENUTUP LANTAI & DINDING


1 Memasang 1 m2 lantai keramik 40 x 40 cm
Keramik 30 x 30 cm M2 1.0000
Bahan Semen portland Kg 11.3800
Pasir pasang M3 0.0420
Semen warna Kg 1.5000
Pekerja Oh 0.6200
Tenaga Kerja Tukang batu Oh 0.3500
Kepala tukang batu Oh 0.0350
Mandor Oh 0.0300
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 Memasang 1 m2 lantai keramik 20 x 20 cm
Keramik 20 x 20 cm M2 1.0000
Bahan Semen portland Kg 11.3800
Pasir pasang M3 0.0420
Semen warna Kg 1.5000
Pekerja Oh 0.6200
Tenaga Kerja Tukang batu Oh 0.3500
Kepala tukang batu Oh 0.0350
Mandor Oh 0.0300
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
3 Memasang 1 m2 Dinding keramik 20 x 20 cm
Keramik 20 x 20 cm M2 1.0000
Bahan Semen portland Kg 11.3800
Pasir pasang M3 0.0420
Semen warna Kg 1.5000
Pekerja Oh 0.6200
Tenaga Kerja Tukang batu Oh 0.3500
Kepala tukang batu Oh 0.0350
Mandor Oh 0.0300
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
4 Memasang 1 m1 Keramik Plint 10x30 cm
Analisa Page 137
NO. KEBUTUHAN Sat. INDEKS

Keramik 10 x 30 cm m2 0.1000
Bahan Semen portland Kg 1.6500
Pasir pasang M3 0.0032
Semen warna Kg 0.1000
Pekerja Oh 0.0620
Tenaga Kerja Tukang batu Oh 0.0350
Kepala tukang batu Oh 0.0035
Mandor Oh 0.0030
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan

N. PENETAPAN INDEK HARGA SATUAN PEKERJAAN KUNCI & KACA


1 Memasang 1 M2 pasang kaca polos , tebal 3 mm
Bahan Kaca polos 3 mm m2 1.1000
Pekerja Oh 0.0150
Tenaga Kerja Tukang kayu Oh 0.1500
Kepala tukang kayu Oh 0.0150
Mandor Oh 0.0008
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 Memasang 1 M2 pasang kaca Ryben , tebal 5 mm
Bahan Kaca ryban 5 mm m2 1.1000
Pekerja Oh 0.0150
Tenaga Kerja Tukang kayu Oh 0.1500
Kepala tukang kayu Oh 0.0150
Mandor Oh 0.0008
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
O. PENETAPAN INDEK HARGA SATUAN PEKERJAAN SANITARY
1 Memasang I buah kloset jongkok sek Toto
Bahan Kloset jongkok porselen Bh 1.0000
Perlengkapan 35% dari harga bahan ls 1.0000
Pekerja Oh 3.3000
Tenaga Kerja Tukang batu Oh 1.1000
Kepala tukang batu Oh 0.0010
Mandor Oh 0.1600
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 Memasang I bh kran Ø 3/4" atau 1/2" Toto T23B13

Analisa Page 138


NO. KEBUTUHAN Sat. INDEKS

Bahan Kran air Bh 1.0000


Seal tape Ls 1.0000
Pekerja Oh 0.0100
Tenaga Kerja Tukang batu Oh 0.1000
Kepala tukang batu Oh 0.0100
Mandor Oh 0.0050
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
3 Memasang I bh Floor drain STS Toto TX1BN
Bahan Floor drain Sts Bh 1.0000
Pekerja Oh 0.0100
Tenaga Kerja Tukang batu Oh 0.1000
Kepala tukang batu Oh 0.0100
Mandor Oh 0.0050
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
8 Memasang I m2 Cermin t= 5mm
Bahan Cermin m2 1.0000
Pekerja Oh 0.0100
Tenaga Kerja Tukang batu Oh 0.1000
Kepala tukang batu Oh 0.0100
Mandor Oh 0.0050
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
P. PENETAPAN INDEK HARGA SATUAN PEKERJAAN PEDESTRIAN, SALURAN AIR DAN JALAN
1 Memasang 1 m2 Paving Blok t=8 cm Natural
Bahan Paving Block 8 cm m2 1.0100
Pasir Beton m3 0.1000
Pekerja Oh 0.2500
Tenaga Kerja Tukang Oh 0.5000
Kepala tukang Oh 0.0250
Mandor Oh 0.0030
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
2 Memasang 1 m1 Kansteen
Galian Tanah m3 0.2500
Buangan tanah m3 0.2500
Kansteen m' 1.0000
Adukan Speci. 1 : 3 m2 0.1500
Analisa Page 139
NO. KEBUTUHAN Sat. INDEKS

Jumlah
Dibulatkan
3 Memasang 1 m1 Saluran Air Batu Belah tipe 1
Galian Tanah m3 0.8100
Buangan tanah m3 0.8100
Batu Belah m3 0.5250

Jumlah
Dibulatkan
4 Memasang 1 m1 Saluran Air Batu Belah tipe 2 + Decker Beton
Galian Tanah m3 0.8100
Buangan tanah m3 0.8100
Batu Belah m3 0.5250
Plat Decker Beton K-250 t=15 cm m3 0.1260
Jumlah
Dibulatkan
5 Memasang 1 m1 Saluran Air Batu belah tipe 3
Galian Tanah m3 0.2500
Buangan tanah m3 0.2500
Batu Belah m3 1.2800
Adukan Speci. 1 : 3 m2 0.1500
Jumlah
Dibulatkan
6 Memasang 1 m1 Saluran Gravel U 50 cm tipe 4 + Decker Beton
Galian Tanah m3 0.7700
Buangan tanah m3 0.7700
Lantai kerja m3 0.0500
Plat Decker Beton K-250 t=10 cm m3 0.1000
Gravel U 20cm m' 1.0000
Pas.1/2 Bata add. 1 : 3 m2 0.6000
Plesteran add. 1 : 3 m2 0.6000
Acian m2 0.6000
Jumlah
Dibulatkan
7 Memasang 1 m1 Saluran Gravel U 50 cm tipe 5 + Grill Plat Besi
Galian Tanah m3 0.7700
Buangan tanah m3 0.7700
Lantai kerja m3 0.0500
Grill Plat Besi 40.4 mm m3 1.0000
Gravel U 20cm m' 1.0000
Pas.1/2 Bata add. 1 : 3 m2 0.6000
Plesteran add. 1 : 3 m2 0.6000
Acian m2 0.6000
Jumlah
Dibulatkan
13 Membuat 1 M2 Pagar Gerbang
Pipa 3" kg 18.0000

Analisa Page 140


NO. KEBUTUHAN Sat. INDEKS

Bahan Besi D 12 mm kg 8.9000


Cat Besi m2 1.0000

Pekerja OH 1.0500
Tenaga Kerja Tukang OH 1.0500
Kepala Tukang OH 0.1050
Mandor OH 0.0520
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
14 Membuat 1 m1 Pagar Panel Beton Precast
Pagar beton Precast uk. 240x40x15 Bh 7.0000
Pekerja OH 0.5000
Tenaga Kerja Tukang Batu OH 0.2500
Kepala Tukang Batu OH 0.0250
Mandor OH 0.0250
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
14 Membuat 1 bh Tiang Pagar Panel Beton Precast
Bahan Tiang beton uk.20x16x300 cm Bh 1.0000
Pekerja OH 0.5000
Tenaga Kerja Tukang Batu OH 0.2500
Kepala Tukang Batu OH 0.0250
Mandor OH 0.0250
Jumlah
Keuntungan Max 10% 10%
Jumlah+keuntungan
Dibulatkan
6 Memasang 1 m1 Pagar Bata Finish Plester, Aci & Cat
Galian Tanah m3 0.7700
Buangan tanah m3 0.7700
Lantai kerja m3 0.0500
Pek. Beton Kolom Praktis 15/15, K-250 m3 0.0090
Pas.1/2 Bata add. 1 : 3 m2 1.2000
Plesteran add. 1 : 3 m2 2.4000
Acian m2 2.4000
Cat Dinding Exterior, sek. Vinilex m2 2.7000
Jumlah
Dibulatkan

Analisa Page 141


N PEKERJAAN
GARUT TAHUN 2019
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )

1,261,000.00 15,132.00
17,000.00 340.00
1,261,000.00 8,827.00
75,000.00 7,500.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 550.00
24,299.00 18,050.00 42,349.00
2,429.90 1,805.00 4,234.90
26,728.90 19,855.00 46,583.90
26,700.00 19,800.00 46,000.00

90,000.00 67,500.00
110,000.00 2,750.00
- 70,250.00 70,250.00
- 7,025.00 7,025.00
- 77,275.00 77,275.00
- 77,200.00 77,200.00

90,000.00 81,000.00
110,000.00 4,950.00
- 85,950.00 85,950.00
- 8,595.00 8,595.00
- 94,545.00 94,545.00
- 94,500.00 94,500.00

194,000.00 194,000.00
19,400.00 19,400.00
- 213,400.00 213,400.00
- 21,340.00 21,340.00
- 234,740.00 234,740.00
- 234,700.00 234,700.00

75,000.00 75,000.00
110,000.00 55,000.00
18,500.00 18,500.00
- 148,500.00 148,500.00
- 14,850.00 14,850.00
- 163,350.00 163,350.00
Analisa Page 142
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
- 163,300.00 163,000.00

152,000.00 182,400.00
75,000.00 22,500.00
110,000.00 1,100.00
182,400.00 23,600.00 206,000.00
18,240.00 2,360.00 20,600.00
200,640.00 25,960.00 226,600.00
200,600.00 25,900.00 226,000.00

75,000.00 14,400.00
110,000.00 2,090.00
- 16,490.00 16,490.00
- 1,649.00 1,649.00
- 18,139.00 18,139.00
- 18,100.00 18,100.00

63,100.00 32,559.60
110,000.00 5,500.00
- 38,059.60 38,059.60
- 3,805.96 3,805.96
- 41,865.56 41,865.56
- 41,800.00 41,800.00

175,000.00 210,000.00
1,150.00 232,300.00
165,000.00 80,025.00
75,000.00 112,500.00
90,000.00 54,000.00
100,000.00 6,000.00
110,000.00 8,250.00
522,325.00 180,750.00 703,075.00
52,232.50 18,075.00 70,307.50
574,557.50 198,825.00 773,382.50
574,500.00 198,800.00 773,000.00

1,150.00 201,250.00
243,000.00 48,600.00
276,000.00 124,200.00
75,000.00 123,750.00
90,000.00 22,500.00
100,000.00 2,500.00
110,000.00 8,800.00
Analisa Page 143
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
374,050.00 157,550.00 531,600.00
37,405.00 15,755.00 53,160.00
411,455.00 173,305.00 584,760.00
411,400.00 173,300.00 584,700.00

1,150.00 241,500.00
243,000.00 72,900.00
276,000.00 138,000.00
- -
75,000.00 123,750.00
90,000.00 24,750.00
100,000.00 2,800.00
110,000.00 9,130.00
452,400.00 160,430.00 612,830.00
45,240.00 16,043.00 61,283.00
497,640.00 176,473.00 674,113.00
497,600.00 176,400.00 674,000.00

970,000.00 970,000.00
9,700.00 9,700.00
29,100.00 29,100.00

979,700.00 29,100.00 1,008,800.00


97,970.00 2,910.00 100,880.00
1,077,670.00 32,010.00 1,109,680.00
1,077,600.00 32,000.00 1,109,000.00

1,067,000.00 1,067,000.00
10,670.00 10,670.00
32,010.00 32,010.00

1,077,670.00 32,010.00 1,109,680.00


107,767.00 3,201.00 110,968.00
1,185,437.00 35,211.00 1,220,648.00
1,185,000.00 35,000.00 1,220,000.00

7,500.00 7,875.00
14,000.00 210.00
75,000.00 525.00
90,000.00 630.00
100,000.00 700.00
110,000.00 33.00
8,085.00 1,888.00 9,973.00
808.50 188.80 997.30
8,893.50 2,076.80 10,970.30
8,800.00 2,000.00 10,900.00

Analisa Page 144


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
7,000.00 7,350.00
14,000.00 210.00
75,000.00 525.00
90,000.00 630.00
100,000.00 700.00
110,000.00 33.00
7,560.00 1,888.00 9,448.00
756.00 188.80 944.80
8,316.00 2,076.80 10,392.80
8,300.00 2,000.00 10,000.00

1,261,000.00 37,830.00
17,000.00 5,100.00

75,000.00 39,000.00
90,000.00 23,400.00
100,000.00 2,600.00
110,000.00 2,860.00
42,930.00 67,860.00 110,790.00
4,293.00 6,786.00 11,079.00
47,223.00 74,646.00 121,869.00
47,200.00 74,600.00 60,500.00

1,261,000.00 50,440.00
17,000.00 5,100.00

75,000.00 39,000.00
90,000.00 23,400.00
100,000.00 2,600.00
110,000.00 2,860.00
55,540.00 67,860.00 123,400.00
5,554.00 6,786.00 12,340.00
61,094.00 74,646.00 135,740.00
61,000.00 74,600.00 67,500.00

1,261,000.00 42,874.00
17,000.00 6,800.00
1,261,000.00 -
95,000.00 33,250.00
1,261,000.00 105,924.00
75,000.00 49,500.00
90,000.00 29,700.00
100,000.00 3,300.00

Analisa Page 145


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
110,000.00 3,630.00
188,848.00 86,130.00 274,978.00
18,884.80 8,613.00 27,497.80
207,732.80 94,743.00 302,475.80
207,700.00 94,700.00 151,200.00

1,261,000.00 42,874.00
17,000.00 6,800.00
1,261,000.00 12,610.00
95,000.00 33,250.00
1,261,000.00 70,616.00
75,000.00 49,500.00
90,000.00 29,700.00
100,000.00 3,300.00
110,000.00 3,630.00
166,150.00 86,130.00 252,280.00
16,615.00 8,613.00 25,228.00
182,765.00 94,743.00 277,508.00
182,700.00 94,700.00 138,750.00

1,261,000.00 50,440.00
17,000.00 6,800.00
1,261,000.00 18,915.00
95,000.00 33,250.00
1,261,000.00 105,924.00
75,000.00 49,500.00
90,000.00 29,700.00
100,000.00 3,300.00
110,000.00 3,630.00
215,329.00 86,130.00 301,459.00
21,532.90 8,613.00 30,145.90
236,861.90 94,743.00 331,604.90
236,800.00 94,700.00 165,800.00

1,261,000.00 37,830.00
17,000.00 6,800.00
1,261,000.00 18,915.00
95,000.00 33,250.00
1,261,000.00 105,924.00
75,000.00 49,500.00
90,000.00 29,700.00
100,000.00 3,300.00
110,000.00 3,630.00
202,719.00 86,130.00 288,849.00
20,271.90 8,613.00 28,884.90
222,990.90 94,743.00 317,733.90
222,900.00 94,700.00 158,850.00

Analisa Page 146


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )

+ bekisting)
1,220,000.00 1,220,000.00
10,900.00 551,104.00
10,900.00 360,336.56
121,000.00 127,050.00
2,258,490.56 - 2,258,490.56
2,258,400.00 - 2,258,000.00
+ bekisting)
1,220,000.00 1,220,000.00
10,900.00 292,846.67
10,900.00 481,780.00
60,500.00 16,940.00
2,011,566.67 - 2,011,566.67
2,011,500.00 - 2,011,000.00
+ bekisting)
1,220,000.00 1,220,000.00
10,900.00 481,780.00
10,900.00 519,566.67
60,500.00 10,890.00
2,232,236.67 - 2,232,236.67
2,232,200.00 - 2,232,000.00
i + bekisting)
1,220,000.00 1,220,000.00
10,900.00 1,338,084.00
10,900.00 1,338,084.00
60,500.00 598,950.00
4,495,118.00 - 4,495,118.00
4,495,100.00 - 4,495,000.00
i + bekisting)
1,220,000.00 1,220,000.00
10,900.00 876,578.00
10,900.00 876,578.00
60,500.00 242,000.00
3,215,156.00 - 3,215,156.00
3,215,100.00 - 3,215,100.00

1,109,000.00 1,109,000.00
10,900.00 578,136.00
10,900.00 377,794.00
60,500.00 605,000.00
2,669,930.00 - 2,669,930.00
2,669,900.00 - 2,669,000.00

1,109,000.00 1,109,000.00
10,900.00 899,995.56

Analisa Page 147


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
10,900.00 678,215.44
67,500.00 899,910.00
3,587,121.00 - 3,587,121.00
3,587,100.00 - 3,587,000.00

1,109,000.00 1,109,000.00
10,900.00 1,136,652.00
10,900.00 191,077.00
10,000.00 410,260.00
67,500.00 312,187.50
3,159,176.50 - 3,159,176.50
3,159,100.00 - 3,159,100.00

1,109,000.00 1,109,000.00
10,900.00 1,682,197.00
10,900.00 305,854.00
10,900.00 338,466.80
67,500.00 665,955.00
4,101,472.80 - 4,101,472.80
4,101,400.00 - 4,101,000.00

674,000.00 674,000.00
10,900.00 1,201,398.00
10,900.00 320,024.00
151,200.00 1,345,680.00
3,541,102.00 - 3,541,102.00
3,541,100.00 - 3,541,100.00

1,220,000.00 1,220,000.00
10,900.00 1,360,756.00
10,900.00 269,775.00
151,200.00 1,478,736.00
4,329,267.00 - 4,329,267.00
4,329,200.00 - 4,329,200.00

1,220,000.00 1,220,000.00
10,900.00
10,900.00
151,200.00 1,384,992.00
2,604,992.00 - 2,604,992.00
2,604,900.00 - 2,604,000.00

1,220,000.00 1,220,000.00
10,900.00 1,749,471.80
10,900.00 1,072,451.00
151,200.00 1,384,992.00
5,426,914.80 - 5,426,914.80

Analisa Page 148


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
5,426,900.00 - 5,426,000.00

1,220,000.00 1,220,000.00
10,900.00 1,361,192.00
10,900.00 1,007,923.00
151,200.00 1,478,736.00
5,067,851.00 - 5,067,851.00
5,067,800.00 - 5,067,800.00

1,109,000.00 1,109,000.00
10,000.00 825,684.00
10,000.00 622,216.00
138,750.00 1,293,705.00
3,850,605.00 - 3,850,605.00
3,850,600.00 - 3,850,600.00
bekisting)
1,109,000.00 1,109,000.00
10,900.00
10,900.00
10,900.00
138,750.00 1,155,093.75
2,264,093.75 - 2,264,093.75
2,264,000.00 - 2,264,000.00
ekisting)
1,109,000.00 1,109,000.00
10,900.00
10,900.00
10,900.00
138,750.00 1,155,093.75
2,264,093.75 - 2,264,093.75
2,264,000.00 - 2,264,000.00

1,109,000.00 1,109,000.00
10,900.00 526,993.20
10,900.00 191,164.20
10,900.00 170,890.20
138,750.00 1,155,093.75
3,153,141.35 - 3,153,141.35
3,153,100.00 - 3,153,100.00

1,109,000.00 1,109,000.00
10,900.00
10,900.00
10,900.00
138,750.00 1,416,637.50
2,525,637.50 - 2,525,637.50
2,525,600.00 - 2,525,600.00

Analisa Page 149


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )

1,109,000.00 1,109,000.00
10,900.00
10,900.00
10,900.00
138,750.00 1,416,637.50
2,525,637.50 - 2,525,637.50
2,525,600.00 - 2,525,600.00

1,109,000.00 1,109,000.00
10,900.00 955,821.00
10,900.00 382,328.40
10,900.00 556,488.60
138,750.00 847,068.75
3,850,706.75 - 3,850,706.75
3,850,700.00 - 3,850,700.00

1,109,000.00 1,109,000.00
10,900.00 899,995.56
10,900.00 126,157.41
10,900.00 678,215.44
138,750.00 1,293,705.00
4,107,073.41 - 4,107,073.41
4,107,000.00 - 4,107,000.00

1,109,000.00 1,109,000.00
10,900.00
10,900.00
10,900.00
10,900.00
10,900.00
10,900.00
10,900.00 90,833.33
158,850.00 1,588,500.00
2,788,333.33 - 2,788,333.33
2,788,300.00 - 2,788,300.00
esi + bekisting)
1,109,000.00 1,109,000.00
10,900.00 900,165.60
10,900.00 630,118.10
60,500.00 505,507.75
3,144,791.45 - 3,144,791.45
3,144,700.00 - 3,144,700.00

1,109,000.00 1,109,000.00
10,900.00
10,900.00

Analisa Page 150


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
165,800.00 1,385,341.90
2,494,341.90 - 2,494,341.90
2,494,300.00 - 2,494,000.00
+ bekisting)
1,109,000.00 1,109,000.00
10,900.00 434,256.00
10,900.00 434,256.00
165,800.00 1,385,341.90
3,362,853.90 - 3,362,853.90
3,362,800.00 - 3,362,800.00
bekisting)
1,109,000.00 1,109,000.00
10,900.00 434,256.00
10,900.00 434,256.00
60,500.00 505,507.75
2,483,019.75 - 2,483,019.75
2,483,000.00 - 2,483,000.00
/m3 besi + bekisting)
1,109,000.00 1,109,000.00
10,900.00 434,256.00
10,900.00 434,256.00
165,800.00 1,385,341.90
3,362,853.90 - 3,362,853.90
3,362,800.00 - 3,362,800.00

674,000.00 674,000.00
10,900.00 717,583.33
165,800.00 2,039,340.00
3,430,923.33 - 3,430,923.33
3,430,900.00 - 3,430,000.00

674,000.00 674,000.00
10,000.00 83,333.00
10,000.00 6,644.40
151,200.00 945,000.00
1,708,977.40 - 1,708,977.40
1,708,900.00 - 1,708,900.00

1,109,000.00 1,109,000.00
10,900.00 635,106.67
10,900.00 113,905.00
60,500.00 242,000.00
2,100,011.67 - 2,100,011.67
2,100,000.00 - 2,100,000.00

1,109,000.00 1,109,000.00
10,900.00 577,302.76
Analisa Page 151
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
10,900.00 577,302.76
60,500.00 387,200.00
2,650,805.51 - 2,650,805.51
2,650,800.00 - 2,650,800.00

spesi 1 PC : 3 PP
650.00 45,500.00
1,150.00 18,946.25
165,000.00 7,507.50
75,000.00 22,500.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 1,650.00
71,953.75 34,150.00 106,103.75
7,195.38 3,415.00 10,610.38
79,149.13 37,565.00 116,714.13
79,100.00 37,500.00 116,700.00
spesi 1 PC : 5 PP
650.00 45,500.00
1,150.00 11,132.00
165,000.00 7,425.00
75,000.00 22,500.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 1,650.00
64,057.00 34,150.00 98,207.00
6,405.70 3,415.00 9,820.70
70,462.70 37,565.00 108,027.70
70,400.00 37,500.00 108,000.00

6,800.00 85,000.00
1,150.00 11,132.00
165,000.00 7,425.00
75,000.00 22,500.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 1,650.00
103,557.00 34,150.00 137,707.00
10,355.70 3,415.00 13,770.70
113,912.70 37,565.00 151,477.70
113,900.00 37,500.00 151,000.00

1,150.00 12,420.00
165,000.00 4,290.00
75,000.00 7,500.00
90,000.00 10,800.00

Analisa Page 152


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
100,000.00 2,000.00
110,000.00 1,375.00
16,710.00 21,675.00 38,385.00
1,671.00 2,167.50 3,838.50
18,381.00 23,842.50 42,223.50
18,300.00 23,800.00 42,000.00

1,150.00 8,383.50
165,000.00 4,620.00
75,000.00 7,500.00
90,000.00 10,800.00
100,000.00 2,000.00
110,000.00 1,375.00
13,003.50 21,675.00 34,678.50
1,300.35 2,167.50 3,467.85
14,303.85 23,842.50 38,146.35
14,300.00 23,800.00 38,100.00

1,150.00 4,600.00
75,000.00 7,500.00
90,000.00 10,800.00
100,000.00 2,000.00
110,000.00 1,375.00
4,600.00 21,675.00 26,275.00
460.00 2,167.50 2,627.50
5,060.00 23,842.50 28,902.50
5,000.00 23,800.00 28,000.00

1,150.00 4,600.00
75,000.00 10,725.00
90,000.00 9,630.00
100,000.00 1,050.00
110,000.00 1,100.00
4,600.00 22,505.00 27,105.00
460.00 2,250.50 2,710.50
5,060.00 24,755.50 29,815.50
5,000.00 24,700.00 29,800.00

7,500.00 7,537.50
24,000.00 1,200.00
75,000.00 4,500.00
100,000.00 6,000.00
100,000.00 600.00
110,000.00 660.00
8,737.50 11,760.00 20,497.50
Analisa Page 153
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
873.75 1,176.00 2,049.75
9,611.25 12,936.00 22,547.25
9,600.00 12,900.00 22,500.00

24,000.00 960.00

75,000.00 300.00
100,000.00 200.00
100,000.00 20.00
110,000.00 22.00

960.00 542.00 1,502.00


96.00 54.20 150.20
1,056.00 596.20 1,652.20
1,000.00 500.00 1,600.00

8,500.00 9,775.00
24,000.00 960.00
75,000.00 3,000.00
100,000.00 4,000.00
100,000.00 400.00
110,000.00 220.00
10,735.00 7,620.00 18,355.00
1,073.50 762.00 1,835.50
11,808.50 8,382.00 20,190.50
11,800.00 8,300.00 20,000.00

20,000.00 20,000.00
24,000.00 960.00
75,000.00 3,000.00
100,000.00 4,000.00
100,000.00 400.00
110,000.00 220.00
20,960.00 7,620.00 28,580.00
2,096.00 762.00 2,858.00
23,056.00 8,382.00 31,438.00
23,000.00 8,300.00 31,000.00

7,500.00 8,625.00
24,000.00 960.00
75,000.00 3,000.00
100,000.00 4,000.00
100,000.00 400.00
110,000.00 220.00
9,585.00 7,620.00 17,205.00
958.50 762.00 1,720.50

Analisa Page 154


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
10,543.50 8,382.00 18,925.50
10,500.00 8,300.00 18,900.00

7,500.00
24,000.00
75,000.00 1,500.00
100,000.00 2,000.00
100,000.00 200.00
110,000.00 110.00
- 3,810.00 3,810.00
- 381.00 381.00
- 4,191.00 4,191.00
- 4,100.00 4,100.00

7,000.00 8,050.00
24,000.00 960.00
75,000.00 4,500.00
100,000.00 6,000.00
100,000.00 600.00
110,000.00 330.00
9,010.00 11,430.00 20,440.00
901.00 1,143.00 2,044.00
9,911.00 12,573.00 22,484.00
9,900.00 12,500.00 22,400.00

- -
24,000.00 960.00
75,000.00 4,500.00
100,000.00 6,000.00
100,000.00 600.00
110,000.00 330.00
960.00 11,430.00 12,390.00
96.00 1,143.00 1,239.00
1,056.00 12,573.00 13,629.00
1,000.00 12,500.00 13,600.00

131,000.00 131,000.00
75,000.00 90,000.00
100,000.00 120,000.00
- -
- -
131,000.00 210,000.00 341,000.00
13,100.00 21,000.00 34,100.00
144,100.00 231,000.00 375,100.00
144,100.00 231,000.00 375,100.00

131,000.00 131,000.00

Analisa Page 155


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
75,000.00 90,000.00
100,000.00 120,000.00
- -
- -
131,000.00 210,000.00 341,000.00
13,100.00 21,000.00 34,100.00
144,100.00 231,000.00 375,100.00
144,100.00 231,000.00 375,100.00

8,500.00 23,120.00

7,500.00 2,100.00
40,001.50 40,001.50
45,100.00 49,610.00
57,415.75 57,415.75
-
114,831.50 57,415.75 172,247.25
114,800.00 57,400.00 172,000.00

243,000.00 267,300.00

94,344.25 94,344.25
45,100.00 2,255.00
36,389.93 36,389.93
-
363,899.25 36,389.93 400,289.18
363,800.00 36,300.00 400,000.00

223,000.00 245,300.00
8,500.00 17,680.00
8,500.00 30,345.00
102,663.75 102,663.75
29,699.16 29,699.16
9,899.72 9,899.72
435,587.63 - 435,587.63
435,500.00 - 435,500.00

4,000.00 320,000.00
138,100.00 88,384.00
8,500.00 17,680.00
- -
31,954.80 31,954.80
10,651.60 10,651.60
468,670.40 - 468,670.40
468,600.00 - 468,600.00

Analisa Page 156


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
4,000.00 720,000.00
138,100.00 88,384.00
8,500.00 17,680.00
- -

61,954.80 61,954.80
20,651.60 20,651.60
908,670.40 - 908,670.40
908,600.00 - 908,600.00

8,500.00 421,600.00
8,500.00 91,800.00
24,000.00 1,200.00
75,000.00 78,750.00
90,000.00 94,500.00
100,000.00 10,500.00
110,000.00 5,720.00
514,600.00 189,470.00 704,070.00
51,460.00 18,947.00 70,407.00
566,060.00 208,417.00 774,477.00
566,000.00 208,400.00 774,400.00

131,000.00 131,000.00
20,000.00 144,000.00
1,000.00 9,000.00
75,000.00 37,500.00
90,000.00 45,000.00
100,000.00 500.00
110,000.00 3,300.00
284,000.00 86,300.00 370,300.00
28,400.00 8,630.00 37,030.00
312,400.00 94,930.00 407,330.00
312,400.00 94,900.00 407,000.00

78,000.00 78,000.00
105,000.00 420,000.00
1,000.00 9,000.00
75,000.00 37,500.00
90,000.00 45,000.00
100,000.00 500.00
110,000.00 3,300.00
507,000.00 86,300.00 593,300.00
50,700.00 8,630.00 59,330.00
557,700.00 94,930.00 652,630.00
557,700.00 94,900.00 652,000.00

Analisa Page 157


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )

20,000.00 54,400.00
20,000.00 92,400.00
22,500.00 6,300.00
108,025.50 108,025.50
45,100.00 49,610.00
155,367.75 155,367.75
-
310,735.50 155,367.75 466,103.25
31,073.55 15,536.78 46,610.33
341,809.05 170,904.53 512,713.58
341,800.00 170,900.00 512,700.00

11,000.00 11,110.00
33,396.00 33,396.00
45,100.00 49,610.00
301,171.20 301,171.20
-
94,116.00 301,171.20 395,287.20
9,411.60 30,117.12 39,528.72
103,527.60 331,288.32 434,815.92
103,500.00 331,200.00 434,800.00

243,000.00 243,000.00
75,000.00 30,000.00
90,000.00 108,000.00

243,000.00 138,000.00 381,000.00


24,300.00 13,800.00 38,100.00
267,300.00 151,800.00 419,100.00
267,300.00 151,800.00 419,000.00

485,000.00 485,000.00
75,000.00 30,000.00
90,000.00 108,000.00

485,000.00 138,000.00 623,000.00


48,500.00 13,800.00 62,300.00
533,500.00 151,800.00 685,300.00

Analisa Page 158


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
533,500.00 151,800.00 685,000.00

4,850,000.00 4,850,000.00
75,000.00 30,000.00
90,000.00 108,000.00

4,850,000.00 138,000.00 4,988,000.00


485,000.00 13,800.00 498,800.00
5,335,000.00 151,800.00 5,486,800.00
5,335,000.00 151,800.00 5,486,000.00

9,215,000.00 707,712.00
67,000.00 268,000.00
116,000.00 464,000.00
87,000.00 62,640.00
4,000.00 76,800.00
49,000.00 24,500.00
17,000.00 2,550.00
126,100.00 1,008,800.00
75,000.00 56,250.00
90,000.00 54,000.00
100,000.00 6,000.00
110,000.00 4,125.00
2,615,002.00 120,375.00 2,735,377.00
261,500.20 12,037.50 273,537.70
2,876,502.20 132,412.50 3,008,914.70
2,876,500.00 132,400.00 3,008,900.00

9,215,000.00 353,856.00
67,000.00 134,000.00
116,000.00 232,000.00
87,000.00 31,320.00
4,000.00 38,400.00
49,000.00 24,500.00
17,000.00 2,550.00
126,100.00 504,400.00
75,000.00 56,250.00
90,000.00 54,000.00
100,000.00 6,000.00
110,000.00 4,125.00
1,321,026.00 120,375.00 1,441,401.00
132,102.60 12,037.50 144,140.10
1,453,128.60 132,412.50 1,585,541.10
1,453,100.00 132,400.00 1,585,500.00

87,000.00 582,900.00

Analisa Page 159


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
204,015.00 204,015.00
3,008,900.00 3,008,900.00
291,000.00 291,000.00
146,000.00 292,000.00
126,000.00 252,000.00
58,000.00 174,000.00
480,481.50 480,481.50
120,120.38 120,120.38

4,804,815.00 600,601.88 5,405,416.88


4,804,800.00 600,600.00 5,405,400.00

87,000.00 384,540.00
134,589.00 134,589.00
1,585,500.00 1,585,500.00
291,000.00 291,000.00
146,000.00 146,000.00
87,000.00 31,320.00
58,000.00 116,000.00
268,894.90 268,894.90
67,223.73 67,223.73

2,688,949.00 336,118.63 3,025,067.63


2,688,900.00 336,100.00 3,025,000.00

87,000.00 348,000.00
87,000.00 75,037.50
148,063.13 148,063.13
57,110.06 57,110.06
14,277.52 14,277.52
571,100.63 71,387.58 642,488.20
571,100.00 71,300.00 642,400.00

87,000.00 3,567,000.00
87,000.00 1,221,480.00
87,000.00 4,028,100.00
87,000.00 186,615.00
3,151,118.25 3,151,118.25
1,215,431.33 1,215,431.33
303,857.83 303,857.83
12,154,313.25 1,519,289.16 13,673,602.41
12,154,300.00 1,519,200.00 13,673,600.00

87,000.00 1,002,240.00
87,000.00 177,480.00
87,000.00 904,800.00
87,000.00 -

Analisa Page 160


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
729,582.00 729,582.00
281,410.20 281,410.20
70,352.55 70,352.55
2,814,102.00 351,762.75 3,165,864.75
2,814,100.00 351,700.00 3,165,000.00

87,000.00 1,670,400.00
87,000.00 295,800.00
87,000.00 1,444,200.00
87,000.00 -
1,193,640.00 1,193,640.00
460,404.00 460,404.00
115,101.00 115,101.00
4,604,040.00 575,505.00 5,179,545.00
4,604,000.00 575,500.00 5,179,000.00

87,000.00 1,461,600.00
87,000.00 420,210.00
658,633.50 658,633.50
254,044.35 254,044.35
63,511.09 63,511.09
2,540,443.50 317,555.44 2,857,998.94
2,540,400.00 317,500.00 2,857,900.00

87,000.00 464,580.00
87,000.00 85,260.00
192,444.00 192,444.00
74,228.40 74,228.40
18,557.10 18,557.10
742,284.00 92,785.50 835,069.50
742,200.00 92,700.00 835,000.00

375,100.00 2,565,684.00
256,568.40 256,568.40
-
70,556.31 70,556.31
2,822,252.40 70,556.31 2,892,808.71
2,822,200.00 70,500.00 2,892,800.00

375,100.00 2,475,660.00
247,566.00 247,566.00
-
68,080.65 68,080.65
2,723,226.00 68,080.65 2,791,306.65
2,723,200.00 68,000.00 2,791,300.00

375,100.00 2,115,564.00

Analisa Page 161


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
211,556.40 211,556.40
-
58,178.01 58,178.01
2,327,120.40 58,178.01 2,385,298.41
2,327,100.00 58,100.00 2,385,000.00

375,100.00 1,980,528.00
198,052.80 198,052.80
-
54,464.52 54,464.52
2,178,580.80 54,464.52 2,233,045.32
2,178,500.00 54,400.00 2,233,000.00

375,100.00 1,665,444.00
166,544.40 166,544.40
-
45,799.71 45,799.71
1,831,988.40 45,799.71 1,877,788.11
1,831,900.00 45,700.00 1,877,700.00

375,100.00 1,530,408.00
153,040.80 153,040.80
-
42,086.22 42,086.22
1,683,448.80 42,086.22 1,725,535.02
1,683,400.00 42,000.00 1,725,500.00

87,000.00 817,800.00
87,000.00 146,160.00
337,386.00 337,386.00
130,134.60 130,134.60
32,533.65 32,533.65
1,301,346.00 162,668.25 1,464,014.25
1,301,300.00 162,600.00 1,464,000.00

87,000.00 443,700.00
87,000.00 69,600.00
179,655.00 179,655.00
69,295.50 69,295.50
17,323.88 17,323.88
692,955.00 86,619.38 779,574.38
692,900.00 86,600.00 779,500.00

87,000.00 243,600.00
87,000.00 34,800.00
97,440.00 97,440.00
37,584.00 37,584.00

Analisa Page 162


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
9,396.00 9,396.00
375,840.00 46,980.00 422,820.00
375,800.00 46,900.00 422,000.00

87,000.00 278,400.00
126,000.00 80,640.00
125,664.00 125,664.00
48,470.40 48,470.40
12,117.60 12,117.60
484,704.00 60,588.00 545,292.00
484,700.00 60,500.00 545,200.00

87,000.00 504,600.00
126,000.00 80,640.00
204,834.00 204,834.00
79,007.40 79,007.40
19,751.85 19,751.85
790,074.00 98,759.25 888,833.25
790,000.00 98,700.00 888,000.00

20,000.00 38,400.00
20,000.00 96,000.00
20,000.00 11,200.00
20,000.00 82,200.00
45,100.00 49,610.00

138,705.00 138,705.00
-
277,410.00 138,705.00 416,115.00
277,400.00 138,700.00 416,100.00

8,000.00 8,800.00
7,000.00 1,925.00
536.25 536.25
75,000.00 1,500.00
90,000.00 9,000.00
100,000.00 2,000.00
110,000.00 220.00
11,261.25 12,720.00 23,981.25
1,126.13 1,272.00 2,398.13
12,387.38 13,992.00 26,379.38
12,300.00 13,900.00 26,000.00

58,000.00 20,126.00

Analisa Page 163


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
17,000.00 170.00
75,000.00 6,000.00
90,000.00 3,600.00
100,000.00 400.00
110,000.00 440.00
20,296.00 10,440.00 30,736.00
2,029.60 1,044.00 3,073.60
22,325.60 11,484.00 33,809.60
22,300.00 11,400.00 33,800.00

67,000.00 24,388.00
1,219.40 1,219.40
17,000.00 1,870.00
75,000.00 6,000.00
90,000.00 3,600.00
100,000.00 400.00
110,000.00 440.00
27,477.40 10,440.00 37,917.40
2,747.74 1,044.00 3,791.74
30,225.14 11,484.00 41,709.14
30,200.00 11,400.00 41,700.00

16,000.00 16,800.00
4,000.00 600.00
75,000.00 4,500.00
90,000.00 5,400.00
100,000.00 600.00
110,000.00 330.00
17,400.00 10,830.00 28,230.00
1,740.00 1,083.00 2,823.00
19,140.00 11,913.00 31,053.00
19,100.00 11,900.00 31,000.00

- -
17,000.00 850.00
75,000.00 2,250.00
90,000.00 2,700.00
100,000.00 500.00
110,000.00 330.00
850.00 5,780.00 6,630.00
85.00 578.00 663.00
935.00 6,358.00 7,293.00
900.00 6,300.00 7,200.00

34,000.00 34,000.00
Analisa Page 164
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
1,700.00 1,700.00
75,000.00 -
90,000.00 18,000.00
100,000.00 -
110,000.00 -
35,700.00 18,000.00 53,700.00
3,570.00 1,800.00 5,370.00
39,270.00 19,800.00 59,070.00
39,200.00 19,800.00 59,000.00

44,000.00 46,200.00
20,000.00 75,000.00
75,000.00 30,000.00
90,000.00 18,000.00
100,000.00 2,000.00
110,000.00 2,200.00
121,200.00 52,200.00 173,400.00
12,120.00 5,220.00 17,340.00
133,320.00 57,420.00 190,740.00
133,300.00 57,400.00 190,000.00

78,000.00 85,800.00
1,000.00 4,000.00
75,000.00 7,500.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 1,100.00
89,800.00 18,600.00 108,400.00
8,980.00 1,860.00 10,840.00
98,780.00 20,460.00 119,240.00
98,700.00 20,400.00 119,200.00

78,000.00 85,800.00
1,000.00 4,000.00
75,000.00 7,500.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 1,100.00
89,800.00 18,600.00 108,400.00
8,980.00 1,860.00 10,840.00
98,780.00 20,460.00 119,240.00
98,700.00 20,400.00 119,200.00

68,000.00 68,000.00
75,000.00 750.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 550.00
Analisa Page 165
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
68,000.00 11,300.00 79,300.00
68,000.00 11,300.00 79,300.00

4,000.00 120,000.00
12,000.00 12,000.00
75,000.00 7,500.00
90,000.00 9,000.00
- -
- -
132,000.00 16,500.00 148,500.00
13,200.00 1,650.00 14,850.00
145,200.00 18,150.00 163,350.00
145,200.00 18,100.00 163,300.00

13,000.00 13,650.00

1,000.00 4,000.00
90,000.00 9,000.00
100,000.00 10,000.00
110,000.00 1,100.00
- -
17,650.00 20,100.00 37,750.00
1,765.00 2,010.00 3,775.00
19,415.00 22,110.00 41,525.00
19,400.00 22,100.00 41,000.00

49,000.00 9,800.00
52,000.00 7,800.00
- -
47,000.00 12,220.00
4,500.00 45.00
6,000.00 300.00
75,000.00 7,500.00
90,000.00 1,620.00
100,000.00 1,200.00
110,000.00 550.00
30,165.00 10,870.00 41,035.00
3,016.50 1,087.00 4,103.50
33,181.50 11,957.00 45,138.50
33,100.00 11,900.00 45,100.00

49,000.00 9,800.00
52,000.00 7,800.00
- -
47,000.00 12,220.00
5,500.00 55.00
Analisa Page 166
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
6,000.00 300.00
75,000.00 7,500.00
90,000.00 1,620.00
100,000.00 1,200.00
110,000.00 550.00
30,175.00 10,870.00 41,045.00
3,017.50 1,087.00 4,104.50
33,192.50 11,957.00 45,149.50
33,100.00 11,900.00 45,100.00

47,000.00 11,750.00
49,000.00 10,780.00
52,000.00 10,400.00
12,000.00 15,600.00
5,500.00 22,000.00
3,526.50 3,526.50
75,000.00 26,250.00
90,000.00 22,500.00
100,000.00 2,500.00
110,000.00 275.00
74,056.50 51,525.00 125,581.50
7,405.65 5,152.50 12,558.15
81,462.15 56,677.50 138,139.65
81,400.00 56,600.00 138,100.00

- -
16,000.00 4,160.00
4,500.00 450.00
22,000.00 550.00
75,000.00 3,000.00
90,000.00 7,200.00
100,000.00 800.00
110,000.00 550.00
5,160.00 11,550.00 16,710.00
516.00 1,155.00 1,671.00
5,676.00 12,705.00 18,381.00
5,600.00 12,700.00 18,300.00
NTERIOR)
16,000.00 1,600.00
- -
16,000.00 4,160.00
4,500.00 450.00
22,000.00 550.00
75,000.00 3,000.00
90,000.00 7,200.00
100,000.00 800.00
110,000.00 550.00

Analisa Page 167


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
6,760.00 11,550.00 18,310.00
676.00 1,155.00 1,831.00
7,436.00 12,705.00 20,141.00
7,400.00 12,700.00 20,100.00

16,000.00 800.00
- -
16,000.00 4,160.00
4,500.00 450.00
22,000.00 550.00
75,000.00 3,000.00
90,000.00 7,200.00
100,000.00 800.00
110,000.00 550.00
5,960.00 11,550.00 17,510.00
596.00 1,155.00 1,751.00
6,556.00 12,705.00 19,261.00
6,500.00 12,700.00 19,200.00

23,000.00 5,750.00
49,000.00 10,780.00
58,000.00 11,600.00
39,000.00 7,020.00
- -
5,500.00 22,000.00
6,000.00 3,000.00
3,007.50 3,007.50
75,000.00 26,250.00
90,000.00 22,500.00
100,000.00 2,500.00
110,000.00 275.00
63,157.50 51,525.00 114,682.50
6,315.75 5,152.50 11,468.25
69,473.25 56,677.50 126,150.75
69,400.00 56,600.00 126,100.00

8,000.00 40,000.00
75,000.00 5,250.00
90,000.00 10,800.00
40,000.00 16,050.00 56,050.00
4,000.00 1,605.00 5,605.00
44,000.00 17,655.00 61,655.00
44,000.00 17,600.00 61,600.00

63,000.00 31,500.00
4,500.00 2,250.00
6,000.00 60.00
75,000.00 1,500.00
90,000.00 18,000.00
100,000.00 2,000.00
Analisa Page 168
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
110,000.00 1,100.00
33,810.00 22,600.00 56,410.00
3,381.00 2,260.00 5,641.00
37,191.00 24,860.00 62,051.00
37,100.00 24,800.00 62,000.00

75,000.00 75,000.00
1,150.00 13,087.00
165,000.00 6,930.00
6,000.00 9,000.00
75,000.00 46,500.00
90,000.00 31,500.00
100,000.00 3,500.00
110,000.00 3,300.00
104,017.00 84,800.00 188,817.00
10,401.70 8,480.00 18,881.70
114,418.70 93,280.00 207,698.70
114,400.00 93,200.00 207,600.00

41,000.00 41,000.00
1,150.00 13,087.00
165,000.00 6,930.00
6,000.00 9,000.00
75,000.00 46,500.00
90,000.00 31,500.00
100,000.00 3,500.00
110,000.00 3,300.00
70,017.00 84,800.00 154,817.00
7,001.70 8,480.00 15,481.70
77,018.70 93,280.00 170,298.70
77,000.00 93,200.00 170,000.00

51,000.00 51,000.00
1,150.00 13,087.00
165,000.00 6,930.00
6,000.00 9,000.00
75,000.00 46,500.00
90,000.00 31,500.00
100,000.00 3,500.00
110,000.00 3,300.00
80,017.00 84,800.00 164,817.00
8,001.70 8,480.00 16,481.70
88,018.70 93,280.00 181,298.70
88,000.00 93,200.00 181,200.00

Analisa Page 169


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
75,000.00 7,500.00
1,150.00 1,897.50
165,000.00 528.00
6,000.00 600.00
75,000.00 4,650.00
90,000.00 3,150.00
100,000.00 350.00
110,000.00 330.00
10,525.50 8,480.00 19,005.50
1,052.55 848.00 1,900.55
11,578.05 9,328.00 20,906.05
11,500.00 9,300.00 20,900.00

87,000.00 95,700.00
75,000.00 1,125.00
90,000.00 13,500.00
100,000.00 1,500.00
110,000.00 82.50
95,700.00 16,207.50 111,907.50
9,570.00 1,620.75 11,190.75
105,270.00 17,828.25 123,098.25
105,200.00 17,800.00 123,000.00

87,000.00 95,700.00
75,000.00 1,125.00
90,000.00 13,500.00
100,000.00 1,500.00
110,000.00 82.50
95,700.00 16,207.50 111,907.50
9,570.00 1,620.75 11,190.75
105,270.00 17,828.25 123,098.25
105,200.00 17,800.00 123,000.00

243,000.00 243,000.00
85,050.00 85,050.00
75,000.00 247,500.00
90,000.00 99,000.00
100,000.00 100.00
110,000.00 17,600.00
328,050.00 364,200.00 692,250.00
32,805.00 36,420.00 69,225.00
360,855.00 400,620.00 761,475.00
360,800.00 400,600.00 761,400.00

Analisa Page 170


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
94,000.00 94,000.00
32,900.00 32,900.00
75,000.00 750.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 550.00
126,900.00 11,300.00 138,200.00
12,690.00 1,130.00 13,820.00
139,590.00 12,430.00 152,020.00
139,500.00 12,400.00 152,000.00

92,000.00 92,000.00
75,000.00 750.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 550.00
92,000.00 11,300.00 103,300.00
9,200.00 1,130.00 10,330.00
101,200.00 12,430.00 113,630.00
101,200.00 12,400.00 113,600.00

136,000.00 136,000.00
75,000.00 750.00
90,000.00 9,000.00
100,000.00 1,000.00
110,000.00 550.00
136,000.00 11,300.00 147,300.00
13,600.00 1,130.00 14,730.00
149,600.00 12,430.00 162,030.00
149,600.00 12,400.00 162,000.00
AN JALAN

44,000.00 44,440.00
243,000.00 24,300.00
75,000.00 18,750.00
90,000.00 45,000.00
100,000.00 2,500.00
110,000.00 330.00
68,740.00 66,580.00 135,320.00
6,874.00 6,658.00 13,532.00
75,614.00 73,238.00 148,852.00
75,600.00 73,200.00 148,800.00

77,200.00 19,300.00
41,800.00 10,450.00
13,000.00 13,000.00
42,000.00 6,300.00
Analisa Page 171
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
49,050.00 - 49,050.00
49,000.00 - 49,000.00

77,200.00 62,532.00
41,800.00 33,858.00
773,000.00 405,825.00

502,215.00 - 502,215.00
502,200.00 - 502,200.00

77,200.00 62,532.00
41,800.00 33,858.00
773,000.00 405,825.00
2,483,000.00 312,858.00
815,073.00 - 815,073.00
815,000.00 - 815,000.00

77,200.00 19,300.00
41,800.00 10,450.00
773,000.00 989,440.00
42,000.00 6,300.00
1,025,490.00 - 1,025,490.00
1,025,400.00 - 1,025,400.00

77,200.00 59,444.00
41,800.00 32,186.00
674,000.00 33,700.00
1,109,000.00 110,900.00
121,000.00 121,000.00
108,000.00 64,800.00
42,000.00 25,200.00
29,800.00 17,880.00
465,110.00 - 465,110.00
465,100.00 - 465,100.00

77,200.00 59,444.00
41,800.00 32,186.00
674,000.00 33,700.00
2,483,000.00 2,483,000.00
121,000.00 121,000.00
108,000.00 64,800.00
42,000.00 25,200.00
29,800.00 17,880.00
2,837,210.00 - 2,837,210.00
2,837,200.00 - 2,837,200.00

8,500.00 153,000.00

Analisa Page 172


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN BAHAN UPAH TOTAL
( Rp ) ( Rp ) ( Rp ) ( Rp )
7,500.00 66,750.00
45,100.00 45,100.00

75,000.00 78,750.00
90,000.00 94,500.00
100,000.00 10,500.00
110,000.00 5,720.00
264,850.00 189,470.00 454,320.00
26,485.00 18,947.00 45,432.00
291,335.00 208,417.00 499,752.00
291,300.00 208,400.00 499,700.00

73,000.00 511,000.00
75,000.00 37,500.00
90,000.00 22,500.00
100,000.00 2,500.00
110,000.00 2,750.00
511,000.00 65,250.00 576,250.00
51,100.00 6,525.00 57,625.00
562,100.00 71,775.00 633,875.00
562,100.00 71,700.00 633,800.00

204,000.00 204,000.00
75,000.00 37,500.00
90,000.00 22,500.00
100,000.00 2,500.00
110,000.00 2,750.00
204,000.00 65,250.00 269,250.00
20,400.00 6,525.00 26,925.00
224,400.00 71,775.00 296,175.00
224,400.00 71,700.00 296,100.00

77,200.00 59,444.00
41,800.00 32,186.00
674,000.00 33,700.00
4,329,200.00 38,962.80
108,000.00 129,600.00
42,000.00 100,800.00
29,800.00 71,520.00
18,300.00 49,410.00
466,212.80 - 466,212.80
466,200.00 - 466,200.00

Analisa Page 173


ANALISA HARGA SATUAN PEKERJAAN

NO. URAIAN KODE SATUAN INDEKS

1 1 M1 PEKERJAAN TIANG PANCANG BETON BERTULANG SQUARE 25X25 CM (Analisa PU 2012, A.4.1, F.04, La
A Tenaga:
Pekerja L01 oh 0.035
Mandor L04 oh 0.005
B Bahan:
Tiang Pancang Square 25 M23 m1 1.030
C Peralatan:
Alat Pancang, Jacked in Pile, Hydraulic Jacked E02 hari-sewa 0.035
Piling Sytem
Alat Penyambung Tiang Pancang E03 bh 0.250
D Jumlah (A+B+C)
E Over Head & Profit
F Jumlah (D+E)
G Dibulatkan (F)

Halaman 174 dari 307


A HARGA SATUAN PEKERJAAN
HARGA SATUAN JUMLAH HARGA JUMLAH
BAHAN/UPAH BAHAN UPAH HARGA
(RP) (RP) (RP) (RP)
5X25 CM (Analisa PU 2012, A.4.1, F.04, Lampiran SDA)

75,000.00 2,625.00
110,000.00 550.00

218,000.00 224,540.00

257,000.00 8,995.00

49,000.00 12,250.00
224,540.00 24,420.00 248,960.00
24,896.00
273,856.00
273,800.00

Halaman 175 dari 307


DAFTAR HARGA SATUAN BAHAN
BANGUNAN PASAR LELES KAB. GARUT TAHUN 2019

NO. JENIS BAHAN BANGUNAN SAT.

A. AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1 Tanah Urug m3
2 Pasir Urug m3
3 Sirtu m3
4 Pasir Pasang m3
5 Pasir Beton 1 m3
6 Batu Pecah Mesin 1/2 m3
7 Batu Pecah Mesin 2/3 m3
8 Batu Pecah Mesin 3/5 m3
9 Batu Pecah Mesin 5/7 m3
10 Batu Belah Pondasi m3
11 Gravel Buis Beton U 50 cm bh
12 Bata Roster Beton 40x20x15 bh
13 Bata Merah Bakar Kelas I bh
14 Paving Blok Natural 8 cm m2
15 Paving Blok Warna 8 cm m2
16 Paving Blok 8 cm m2
17 Paving Blok Warna 6 cm m2
18 Grass Block m2
19 Kanstin m1
20 Semen Tiga Roda / 50 Kg kg
21 Readymix Beton K 250, tanpa pompa ( selang ) m3
22 Readymix Beton K 300, tanpa pompa ( selang ) m3
23 Semen Warna kg
B. BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA
1 Plamir Tembok kg
2 Cat Tembok Vinilex Exterior kg
3 Cat Tembok Vinilex Interior kg
4 Water Profing Cementitious kg
5 Water Profing Membrance m1
6 Roll Cat bh
7 Kape Tembok bh
8 Kwas 3" bh
9 Dempul Halus / Impra ( Wood Filler kg
10 Terpentin lt
11 Tiner A lt
12 Ampelas lbr
12 Ampelas halus/duco lbr
14 Dempul Duco kg
15 Cat Dasar Epoxy / Besi kg
16 Zinchromat kg
17 Cat Kayu kg
18 Cat Besi kg
19 Sanding saller kg
20 Wood Stain lt
21 Top Coat Clear Dof lt
22 ML 131 Clear DanaGloss lt
23 Melamin Lack Clear Dof lt
24 Dempul Kayu Cap Kucing kg

Bahan Page 176


NO. JENIS BAHAN BANGUNAN SAT.

25 Lem Kuning kg
26 Sealent Karet kg
27 Floor Hardener sek. Sika kg
28 Sealent per m' m1

Bahan Page 177


NO. JENIS BAHAN BANGUNAN SAT.

C. BAHAN KAYU BERIKUT BAHAN JADINYA


1 Kayu Terentang m3
2 Kayu Balok Kamper Samarinda Oven m3
3 Kayu Papan Kamper Samarinda Oven m3
4 Kayu Albasia m3
5 Dolken 5 s/d 7 bt
D. BAHAN PENUTUP PLAFOND DAN PARTISI
1 GRC Board 120 x 240 t = 4 mm ex DN lbr
2 Gypsum 120 x 240 t = 9 mm ex DN lbr
3 List profil Gypsum 5 cm m1

E. BAHAN KAYU LAPIS


1 Triplek 5 mm 120 x 240 lbr
2 Multiplek 9 mm 120 x 240 lbr
3 Multiplek 12 mm 120 x 240 lbr
4 Multiplek 15 mm 120 x 240 lbr
5 Multiplek 18 mm 120 x 240 lbr
6 Plywood 3 mm Ukuran Pintu lbr
7 Plywood 4 mm Ukuran Pintu lbr

F. BAHAN LANTAI DAN PELAPIS DINDING


1 Keramik 40 x40 cm sek. Mulia m2
2 Keramik 20 x 20 cm sek. Mulia anti slip m2
3 Keramik Dinding 20 x 20 cm sek. Mulia m2

G. BAHAN LOGAM DAN BAHAN JADINYA


1 Besi Beton U-24 Rata-Rata kg
2 Besi Beton U-39 / U-32 Rata-Rata kg
3 IWF Ex DN SII kg
4 Besi Profil DN SII, L/C/Lip Channel/Pipa Besi kg
5 Besi Plat Baja 1 mm s/d 16 mm kg
6 Besi Plat Baja 1 mm s/d 16 mm m2
7 Kawat Beton kg
8 Kawat Las Listrik kg
9 Rangka Plafond Hollow 40x40 m1
10 Kusen Alumunium Natural Alexindo t=1.3 mm ( 4" ) m1
11 Frame Daun Jendela Alumunium Natural ( Tanpa Kaca ) m1
12 Frame Daun Pintu Alumunium Natural ( Tanpa Kaca ) m1
13 Allumunium Composite m2
14 Pintu Lipat bahan Plat finishing Cat ( Rolling Door / Sliding Gate ) m2
15 Lem Putih kg
16 Kunci Silinder Utama untuk pintu Aluminium Frameless bh
17 Kunci Silinder dan Body untuk pintu bh
18 Lever Handle Pintu bh
19 Handle Bar Sts bh
20 Kunci Pintu besi bh
21 Rambucis Sek. Dekson Type CHW - 4 - RYB1C Psg
22 Handle Alumunium ( Tarikan Pintu Alumunium ) tipe Balok bh
23 Engsel Pintu ps
24 Engsel Jendela ps
25 Engsel Pintu Aluminium ps
Bahan Page 178
NO. JENIS BAHAN BANGUNAN SAT.

26 Engsel Casement Jendela Aluminium 14' ps


27 Engsel Pintu Tanam (Floor Hinges) sek.Dorma ps
28 Engsel Pintu Besi (Engsel bubut) bh
29 Sloot Pintu Tanam/Espanolet aluminium bh
30 Sloot Pintu Tanam/Espanolet bh
31 Sloot Jendela Putar aluminium bh
32 Sloot Jendela bh
33 Bilah Louvre m2
34 Pintu PVC ps

Bahan Page 179


NO. JENIS BAHAN BANGUNAN SAT.

35 Kusen Lip Chanel 100.50.20.2,3 uk. 160cm tinggi 210 cm & Pintu uk. 2x80cm unit
Plat Besi 1 mm Rangka Hollow 40x40 Lkp. Asesoris Finish Cat
36 Door Closer ps
37 Frame Pintu Kaca Alumunium ( Frameless ) sek. Alexindo psg
38 Kusen & Pintu Allummunium Spanrel unit
39 List Alumunium 1 cm m2
40 Atap Polycarbonat t= 6 mm m2
41 SolarFlat m2
42 Huruf 3 Dimensi ( bhn. Plat ) /1 cm cm
43 Roofdrain Sts Ø 3" bh
44 Rangka Hollow 2/4 m1
45 Pipa Ø 2 " m1
46 Pipa Ø 6 " m1
47 Karet dilatasi m1
48 Ram Kawat m2
H. BAHAN KACA
1 Kaca Polos 5 mm sek. Mulia m2
2 Kaca Tempered 12 mm sek. Mulia m2
3 Kaca Tempered 10 mm sek. Mulia m2
4 Kaca Tempered 8 mm sek. Mulia m2

I. BAHAN PAKU DAN MUR BAUT


1 Paku 1 cm s/d 3 cm kg
2 Paku 4 cm s/d 7 cm kg
3 Paku 8 cm s/d 12 cm kg
4 Duk Angker bh
5 Angker Mur Baut dia. 19 / Panjang 60 cm bh
6 Mur Baut HTB dia. 19 s/d 16 ( 5 cm ) bh
7 Mur Baut HTB Biasa. 19 s/d 16 ( 5 cm ) bh
8 Pisher dia. 12 s/d 20 cm. bh
9 Paku Skrup. 12 s/d 20 cm. bh
10 Paku Skrup 1 1/4 dus
J. BAHAN SANITAIR
1 Kloset Jongkok sek. Toto CE 6 unit
2 Kran Dinding Ø 1/2" Toto T23B13 bh
3 Floor Drain Sts Toto TX1BN bh
4 Cermin t= 5 mm m2

K. BAHAN PENUTUP ATAP


1 Alumunium Foile m2
2 Atap Metal Zincallum Gelombang m2
3 Talang Metal m2
4 Nok Atas Metal Zincallum m1
5 Penutup Atap Aspal Bitumen Monolayer 3mm lbr
6 Wood Plastic Compostie 10 x 1 cm btg
L. BAHAN TANAMAN
1 Tanaman rumput gajah ( termasuk Upah Tanam ) m2
M. BAHAN PAGAR PANEL BETON
1 Pagar beton Precast uk. 240x40x15 bh
2 Tiang beton uk.20x16x300 cm bh
Bahan Page 180
NO. JENIS BAHAN BANGUNAN SAT.

N. ALAT BERAT
1 Galian Tanah dengan Excavator & Buang Tanah dg Dump Truck kap. 6 m3 m3
sejauh 20 km
2 Alat Pancang, Jacked in Pile, Hydraulic Jacked Piling Sytem hari-sewa
3 Alat Penyambung Tiang Pancang bh
4 Mobilisasi Alat Pancang Tipe Jack in Pile Ls

Bahan Page 181


NO. JENIS BAHAN BANGUNAN SAT.

O. Bahan Fondasi Pancang / Mini Pile


1 Tiang Pancang Square 25 (D16) m1
2 Bobokan Kepala Tiang Pancang ttk
P. Pekerjaan Baja Ringan
1 Pek. Baja Ringan m2

Bahan Page 182


SK.GUB2010
HARGA SAT
Rp.

63,100
152,000
152,000
165,000
243,000
194,000
276,000
276,000
262,000
175,000
121,000
6,800
650
44,000
53,000
46,000
45,000
65,000
13,000
1,150
970,000
1,067,000
6,000
###
16,000
16,000
16,000
63,000
73,000
22,000
8,500
6,000
23,000
7,000
12,000
4,500
5,500
52,000
49,000
75,000
47,000
47,000
58,000
49,000
32,000
39,000
38,000
32,000

Bahan Page 183


HARGA SAT
Rp.
18,000
19,000
8,000
5,000

Bahan Page 184


HARGA SAT
Rp.

2,598,000
8,746,000
9,215,000
1,261,000
24,000

58,000
67,000
16,000
###

67,000
95,000
140,000
171,000
162,000
116,000
116,000

75,000
41,000
51,000

7,000
7,500
7,500
8,500
7,500
11,000
14,000
24,000
8,000
87,000
92,000
121,000
223,000
131,000
49,000
243,000
291,000
146,000
582,000
291,000
68,000
78,000
58,000
49,000
146,000
Bahan Page 185
HARGA SAT
Rp.
146,000
1,455,000
87,000
170,000
126,000
49,000
39,000
126,000
243,000

Bahan Page 186


HARGA SAT
Rp.
4,850,000
-
340,000
485,000
485,000
4,000
131,000
78,000
4,000
68,000
5,000
105,000
243,000
243,000
82,000

87,000
446,000
398,000
373,000

17,000
17,000
16,000
17,000
20,000
12,000
7,000
2,000
1,000
20,000

243,000
94,000
92,000
136,000

13,000
78,000
44,000
34,000
155,000
116,000

15,000.00

73,000.00
204,000.00
Bahan Page 187
HARGA SAT
Rp.

194,000.00
-
257,000.00
49,000.00
24,250,000.00

Bahan Page 188


HARGA SAT
Rp.

218,000.00
49,000.00

243,000.00

Bahan Page 189


DAFTAR HARGA SATUAN UPAH KERJA
BANGUNAN PASAR LELES KAB. GARUT TAHUN 2019
HARGA SAT
NO JENIS PEKERJA BANGUNAN SATUAN WAKTU
Rp.

1 PEKERJA TERAMPIL 75,000.00 1 ORANG/HR/ 8 JAM

2 TUKANG TERAMPIL 90,000.00 1 ORANG/HR/ 8 JAM

3 KEPALA TUKANG 100,000.00 1 ORANG/HR/ 8 JAM

4 MANDOR 110,000.00 1 ORANG/HR/ 8 JAM

5 TUKANG LAS LISTRIK 100,000.00 1 ORANG/HR/ 8 JAM

Bandung, 25 Juli 2019


Penawar,
PT. RAYNA DOMINIQUE ZALIKA

ENI GINARSIH ERMAYA


Direktur

Upah Page 190


TIME SCHEDULE
JADWAL PELAKSANAAN PEKERJAAN 120 HARI KALENDAR
REVITALISASI PASAR RAKYAT LELES (LANJUTAN)
KABUPATEN GARUT

TAHUN ANGGARAN 2019

Bulan Pelaksanaan
1 2 3 4 5
NO URAIAN PEKERJAAN Bobot
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
1-7 8 - 14 15 - 21 22 - 28 29 - 35 36 - 42 43 - 49 50 - 56 57 - 63 64 - 70 71 - 77 78 - 84 85 - 91 92 - 98 99 - 105 106 - 112 113 - 119 120

I PEKERJAAN BANGUNAN UTAMA


A PEKERJAAN PERSIAPAN 0.22 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012

B PEKERJAAN PENYELENGGARAAN KEAMANAN DAN KESEHATAN KERJA SERTA


KESELAMATAN KONSTRUKSI 0.29 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016

C PEKERJAAN STRUKTUR DAN ATAP


I PEKERJAAN GALIAN TANAH & URUGAN
II PEKERJAAN PONDASI
III PEKERJAAN BETON LANTAI BASEMENT / LANTAI DASAR 0.68 0.338 0.338
IV PEKERJAAN BETON LANTAI 1 4.25 1.063 1.063 1.063 1.063
V PEKERJAAN BETON LANTAI 2 2.57 0.641 0.641 0.641 0.641
VI PEKERJAAN BETON DAK ATAP 3.86 0.964 0.964 0.964 0.964
VII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP 8.29 0.691 0.691 0.691 0.691 0.691 0.691 0.691 0.691 0.691 0.691 0.691 0.691

D PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI BASEMENT / LANTAI DASAR
II PEKERJAAN LANTAI 1 19.68 1.640 1.640 1.640 1.640 1.640 1.640 1.640 1.640 1.640 1.640 1.640 1.640
III PEKERJAAN LANTAI 2 16.02 1.335 1.335 1.335 1.335 1.335 1.335 1.335 1.335 1.335 1.335 1.335 1.335
IV PEKERJAAN LANTAI DAK BETON 2.19 0.438 0.438 0.438 0.438 0.438

E PEKERJAAN MEKANIKAL & ELEKTRIKAL


I PEKERJAAN LANTAI BASEMENT
II PEKERJAAN LANTAI 1 7.84 0.871 0.871 0.871 0.871 0.871 0.871 0.871 0.871 0.871
III PEKERJAAN LANTAI 2 7.49 1.070 1.070 1.070 1.070 1.070 1.070 1.070
IV PEKERJAAN LANTAI DAK BETON 1.04 0.260 0.260 0.260 0.260

II BANGUNAN SAMPING
A PEKERJAAN STRUKTUR DAN ATAP
I PEKERJAAN PERSIAPAN
II PEKERJAAN GALIAN TANAH & URUGAN
III PEKERJAAN PONDASI
IV PEKERJAAN BETON LANTAI DASAR 0.30 0.101 0.101 0.101
V PEKERJAAN BETON LANTAI 1 0.55 0.183 0.183 0.183
VI PEKERJAAN BETON LANTAI 2 3.38 1.128 1.128 1.128
VII PEKERJAAN BETON DAK ATAP 0.99 0.329 0.329 0.329
VIII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP 1.44 0.479 0.479 0.479 0.479

B PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI Dasar
II PEKERJAAN LANTAI 1 5.12 0.640 0.640 0.640 0.640 0.640 0.640 0.640 0.640
III PEKERJAAN LANTAI 2
IV PEKERJAAN LANTAI DAK BETON

C PEKERJAAN M-E
I PEKERJAAN LANTAI BASEMENT
II PEKERJAAN LANTAI 1 2.36 0.591 0.591 0.591 0.591
III PEKERJAAN LANTAI 2

III PEKERJAAN SITE


A PEKERJAAN STRUKTUR DAN ARSITEKTUR
I PEKERJAAN JALAN 4.94 0.824 0.824 0.824 0.824 0.824 0.824
II PEKERJAAN PAGAR
III PEKERJAAN SALURAN 1.76 0.293 0.293 0.293 0.293 0.293 0.293

B PEKERJAAN M-E
I PEKERJAAN MEKANIKAL & ELEKTRIKAL SITE PLAN 2.09 0.348 0.348 0.348 0.348 0.348 0.348
II PEKERJAAN MEKANIKAL & ELEKTRIKAL R. POMPA 0.61 0.614
III PEKERJAAN MEKANIKAL & ELEKTRIKAL R. PANEL 1.63 0.327 0.327 0.327 0.327 0.327

IV PEKERJAAN POS JAGA


PEKERJAAN POS JAGA

V PEKERJAAN GROUNDTANK & RUMAH POMPA


I PEKERJAAN GROUNDTANK
II PEKERJAAN RUMAH POMPA
VI PEKERJAAN RUMAH PANEL
I PEKERJAAN RUMAH PANEL 0.41 0.068 0.068 0.068 0.068 0.068 0.068

PROGRESS RENCANA MINGGUAN 0.435 0.435 1.159 2.799 3.490 5.694 5.308 5.491 7.932 7.680 8.367 9.482 8.223 8.702 8.958 7.207 5.996 3.121
PROGRESS RENCANA KOMULATIF 0.435 0.869 2.029 4.828 8.318 14.012 19.320 24.811 32.743 40.423 48.790 58.273 66.495 75.197 84.156 91.363 97.358 100

PT. ...................... Bandung, 25 Juli 2019


Penawar,
PT. RAYNA DOMINIQUE ZALIKA

ENI GINARSIH ERMAYA


Direktur

TS Page 191
KEGIATAN
REVITALISASI PASAR LELES (PAJAK ROKOK)
PEKERJAAN SCHEDULE BAHAN/MATERIAL
REVITALISASI PASAR RAKYAT LELES (LANJUTAN)

WAKTU PELAKSANAAN 120 (SERATUS DUA PULUH) HARI KALENDER


NO. JENIS BAHAN CATATAN
BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V
M1 M2 M3 M4 M 5 M 6 M 7 M 8 M 9 M 10 M 11 M 12 M 13 M 14 M 15 M 16 M 17 M 18 120 hari

1 A. AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA

2 B. BAHAN FINISHING

3 C. BAHAN KAYU BERIKUT BAHAN JADINYA

4 D. BAHAN PLAFOND

5 E. BAHAN BAJA WF ATAP DAN PENUTUP ATAP

6 F. BAHAN KACA

7 G. BAHAN LANTAI DAN PELAPIS DINDING

8 H. BAHAN PAKU DAN MUR BAUT

9 I. BAHAN ALAT PENGANTUNG DAN KUNCI

0 0 0 0 0 0 0 0 0 0 0 0 0

Bandung, 25 Juli 2019


Penawar,
PT. RAYNA DOMINIQUE ZALIKA

ENI GINARSIH ERMAYA


Direktur
KEGIATAN
REVITALISASI PASAR LELES (PAJAK ROKOK)
PEKERJAAN SCHEDULE PERALATAN UTAMA
REVITALISASI PASAR RAKYAT LELES (LANJUTAN)

WAKTU PELAKSANAAN 120 (SERATUS DUA PULUH) HARI KALENDER


NO. JENIS ALAT VOLUME CATATAN
BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V
M1 M2 M3 M4 M 5 M 6 M 7 M 8 M 9 M 10 M 11 M 12 M 13 M 14 M 15 M 16 M 17 M 18 120 hari

Dum Truck 5 Unit


Pick Up 2 Unit
Genset 2 Unit
Pompa Air 3 Unit
Concrete Mixer 3 Unit
Concrete Vibrator 1 Unit
Exavator 1 Unit
Alat Ukur Manual 1 Unit
Theodolite 1 Unit
Concret Pump 1 Unit
Grader 1 Unit
Buldozer 1 Unit
Stamper 1 Unit
Alat Pemotong Besi 1 Unit
Sigmat Ukur 5 Unit
Mesin Las 3 Unit
Scapolding 1000
Mesin Gilas 1 Unit

0 0 0 0 0 0 0 0 0 0 0 0 0

Bandung, 25 Juli 2019


Penawar,
PT. RAYNA DOMINIQUE ZALIKA
ENI GINARSIH ERMAYA
Direktur
SCHEDULE MAN POWER

REVITALISASI PASAR LELES (LANJUTAN)


TAHUN ANGGARAN 2019

Bulan Pelaksanaan
1 2 3 4 5
No. Uraian Pendidikan
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 119-120

SITE OFFICE MAN POWER 15 14 14 15 15 14 14 15 15 14 14 15 15 14 14 15 15 15

1 Penanggung Jawab Teknis (Ahli Manajemen Proyek) S1 (Teknik Sipil) 1 1 1 1 1 1 1 1 1 1

2 Wakil Penanggung Jawab Teknis (Ahli Manajemen Konstruksi) S1 (Arsitektur) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1


3 Pelaksana Teknis (Ahli Teknik Bangunan Gedung) S1 (Teknik Sipil) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

4 Pelaksana Teknis (Ahli K3 Konstruksi) S1 (SST.K3) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1


5 Pelaksana Teknis (Arsitek) S1 (Arsitektur) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6 Pelaksana Teknis (Listrik) S1 (Teknik Tenaga Elektrik) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

7 Asisten Pelaksana Teknis (Juru Ukur Kuantitas Bangunan) S1 (Teknik Sipil) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1


8 Asisten Pelaksana Teknis (Juru Gambar Arsitektur) S1 (Arsitektur) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

9 Asisten Pelaksana Teknis (Juru Gambar/Draftman Sipil) S1 (Teknik Sipil) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1


10 Asisten Pelaksana Teknis (Juru Ukur/Teknik Survey Pemetaan) STM (Bangunan) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
11 Penanggung Jawab Administrasi SMK (Akuntansi) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
12 Pelaksana Administrasi SMK 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

13 Penanggung Jawab Keuangan S1 Ekonomi (Manajemen) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1


14 Pelaksana Keuangan SMA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
15 Pelaksana Logistik SMA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

MAN POWER DI LAPANGAN 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

Pekerja 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Tukang 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Kepala Tukang 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Mandor 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Bandung, 25 Juli 2019


Penawar,
PT. RAYNA DOMINIQUE ZALIKA

ENI GINARSIH ERMAYA


Direktur
REKAPITULASI PERHITUNGAN TKDN
REVITALISASI PASAR LELES (LANJUTAN)
TAHUN ANGGARAN 2019

NILAI KONTRAK ( Rp )
Uraian Pekerjaan TOTAL % KDN TKDN GABUNGAN
DN LN Rp % KDN Rp %

Barang Barang
I Material Langsung ( Bahan baku ) Err:509 0 Err:509 50.00
II Peralatan ( barang Jadi ) Err:509 0 Err:509 10.00

A. SUB TOTAL BARANG Err:509 Err:509 60.00 60.00 Err:509 60.00


Jasa Jasa
III Manajemen Proyek dan Err:509 0 Err:509 10.00
Perekayasaan
IV Alat Kerja / Fasilitas Kerja Err:509 0 Err:509 20.00
V Konstruksi dan Fabrikisasi Err:509 0 Err:509 5.00
VI Jasa Umum Err:509 0 Err:509 5.00
B. Sub - Total Jasa Err:509 Err:509 40.00 40.00 Err:509 40.00
C. Total Biaya ( A + b ) Err:509 Err:509

Err:509 Err:509
% TKDN = + Err:509 %
Err:509 Err:509

= 60% + 40%

= 100% Bandung, 25 Juli 2019


Penawar,
PT. RAYNA DOMINIQUE ZALIKA

ENI GINARSIH ERMAYA


Direktur
3.2 PERHITUNGAN KEBUTUHAN BAHAN DAN TENAGA KERJA

I . BANGUNAN UTAMA
A PEKERJAAN PERSIAPAN
Pek. Pengukuran 1.00 Ls
Tenaga Kerja : Koef Volume Jumlah Durasi Jumlah org/hari
Logistik 1.000 x 150.00 = 150.00 hok 150 hari = 1.00 oh
Pelaksana 1.000 x 150.00 = 150.00 hok 150 hari = 1.00 oh
Site manager 1.000 x 150.00 = 150.00 hok 150 hari = 1.00 oh
● Rencana Waktu Penyelesaian Minggu ke - 1 gan minggu ke - 18

Pembersihan Lahan 18.00 Ls


Tenaga Kerja : Koef Volume Jumlah Durasi Jumlah org/hari
Logistik 1.000 x 150.00 = 150.00 hok 150 hari = 1.00 oh
Pelaksana 1.000 x 150.00 = 150.00 hok 150 hari = 1.00 oh
Site manager 1.000 x 150.00 = 150.00 hok 150 hari = 1.00 oh
● Rencana Waktu Pelaksanaan Minggu ke - 1 gan minggu ke - 18

Mobilisasi & Demobilisasi 1.00 Ls

B PEKERJAAN PENYELENGGARAAN KEAMANAN DAN KESEHATAN KERJA SERTA KESELAMATAN KONSTRUKSI

I Persiapan K3
1 Penyiapan RK3K terdiri atas : Pembuatan Manual, Prosedur, Instruksi Kerja 1 set
2 Pembuatan Kartu Identitas Pekerja (KIP) 180 org

II Sosialisasi dan Promosi K3


1 Induksi K3 (Safety Induction); Khusus untuk pekerja baru 180 org
2 Pelatihan K3
- Bekerja di Ketinggian 10 org
- K3 Peralatan Konstruksi & Penggunaan bahan Kimia (MSDS) 10 org
- Analysis Keselamatan Pekerja 20 org
- Perilaku Berbasis Keselamatan ( Budaya K3) 20 org
- P3K 2 org
3 Simulasi K3 180 org
4 Spanduk ( Banner) 2 lbr
5 Poster 2 lbr
6 Papan Informasi 2 lbr

III Alat Pelindung Diri terdiri atas :


1 Topi Pelindung ( Safety Helmet) 180 bh
2 Pelindung Mata (Googles, Spectacles) 10 Psg
3 Tameng Muka ( Face Shield) 5 bh
4 Pelindung Pernafasan dan Mulut ( Masker) 200 bh
5 Sarung Tangan ( Safety Gloves) 20 Psg
6 Sepatu Keselamatan ( Safety Shoes) : Untuk Staf 10 Psg
7 Sepatu Keselamatan (Rubber Safety Shoes and toe cap) 40 Psg
8 Penunjang Seluruh tubuh ( Full Body harness) 20 bh
9 Rompi Keselamatan ( Safety Vest) 180 bh
10 Pelindung Jatuh ( Fall Arrester) 20 bh

Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari


Petugas K3 1.000 x 150.00 = 150.00 hok 150.00 hari = 1.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 18

C PEKERJAAN STRUKTUR DAN ATAP


I PEKERJAAN GALIAN TANAH & URUGAN
II PEKERJAAN PONDASI
III PEKERJAAN BETON LANTAI BASEMENT / LANTAI DASAR
Pek. Beton Kolom Praktis 15/15, K-175 1.830 m3
Beton K-175
Bahan : Koef. Volume Jumlah
Portland Cement 210.000 Kg 1.83 = 384.30 Kg
Pasir Beton 0.300 m3 1.83 = 0.55 m3
KR maks. 30 mm 0.500 m3 1.83 = 0.92 m3
Air 215.000 Liter 1.83 = 393.45 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 1.650 OH 1.83 = 3.02 OH 1 hari = 3.02 oh
Tukang 0.275 OH 1.83 = 0.50 OH 1 hari = 0.50 oh
Kepala tukang 0.028 OH 1.83 = 0.05 OH 1 hari = 0.05 oh
Mandor 0.083 OH 1.83 = 0.15 OH 1 hari = 0.15 oh
● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 1

Besi Beton 4Ø10mm 228.457 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 228.46 = 239.88 Kg
kawat beton 0.015 m3 228.46 = 3.43 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 228.46 = 1.60 OH 1 hari = 1.60 oh
Tukang 0.007 OH 228.46 = 1.60 OH 1 hari = 1.60 oh
Kepala tukang 0.007 OH 228.46 = 1.60 OH 1 hari = 1.60 oh
Mandor 0.000 OH 228.46 = 0.07 OH 1 hari = 0.07 oh
● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 1

Besi Beton Cincin Ø20mm-(100 s/d 200)mm 45.293 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 45.29 = 47.56 Kg
kawat beton 0.015 m3 45.29 = 0.68 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 45.29 = 0.32 OH 1 hari = 0.32 oh
Tukang 0.007 OH 45.29 = 0.32 OH 1 hari = 0.32 oh
Kepala tukang 0.007 OH 45.29 = 0.32 OH 1 hari = 0.32 oh
Mandor 0.000 OH 45.29 = 0.01 OH 1 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 1

Bekisting kolom 16.287 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 1.050 Kg 16.29 = 17.10 Kg
Paku 5 cm-12cm 0.015 m3 16.29 = 0.24 m3
Balok kayu kelas lII 0.007 m3 16.29 = 0.11 m3
Plywood Tebal 9mm
Stoowerk kayu kelas lII 0.007 Liter 16.29 = 0.11 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.660 OH 16.29 = 10.75 OH 1 hari = 10.75 oh
Tukang 0.330 OH 16.29 = 5.37 OH 1 hari = 5.37 oh
Kepala tukang 0.033 OH 16.29 = 0.54 OH 1 hari = 0.54 oh
Mandor 0.033 OH 16.29 = 0.54 OH 1 hari = 0.54 oh
● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 1

Pek. Beton Plat Lantai Ramp Entrance t= 15cm, K-250 7.880 m3


Beton Mutu K-250 7.880 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 7.88 = 7.88
Alat bantu 1.000 m3 7.88 = 7.88
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 2

Besi Beton Tul.melintang 2x Ø 10 mm-150 mm 313.939 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 313.94 = 329.64 Kg
kawat beton 0.015 Kg 313.94 = 4.71 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 313.94 = 2.20 OH 1 hari = 2.20 oh
Tukang 0.007 OH 313.94 = 2.20 OH 1 hari = 2.20 oh
Kepala tukang 0.007 OH 313.94 = 2.20 OH 1 hari = 2.20 oh
Mandor 0.000 OH 313.94 = 0.09 OH 1 hari = 0.09 oh
● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 2

Besi Beton Tul.memanjang 2x Ø10 mm-150 mm 313.939 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 313.94 = 329.64 Kg
kawat beton 0.015 Kg 313.94 = 4.71 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 313.94 = 2.20 OH 1 hari = 2.20 oh
Tukang 0.007 OH 313.94 = 2.20 OH 1 hari = 2.20 oh
Kepala tukang 0.007 OH 313.94 = 2.20 OH 1 hari = 2.20 oh
Mandor 0.000 OH 313.94 = 0.09 OH 1 hari = 0.09 oh
● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 2

Bekisting Lantai 65.841 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.030 M3 65.84 = 1.98 M3
Paku 5 cm- 10 cm 0.300 Kg 65.84 = 19.75 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.520 OH 65.84 = 34.24 OH 7 hari = 4.89 oh
Tukang 0.260 OH 65.84 = 17.12 OH 7 hari = 2.45 oh
Kepala tukang 0.026 OH 65.84 = 1.71 OH 7 hari = 0.24 oh
Mandor 0.026 OH 65.84 = 1.71 OH 7 hari = 0.24 oh
● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 2

Pek. Beton Plat Lantai Ramp Exit t= 15 cm, K-250 7.880 m3


Beton Mutu K-250 7.875 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 7.88 = 7.88 m3
Alat bantu 1.000 m3 7.88 = 7.88 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS 7.88 7.88 LS 1 hari = 7.88 oh
● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 2

Besi Beton Tul.melintang 2x Ø 10 mm-150 mm 313.740 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 313.74 = 329.43 Kg
kawat beton 0.015 Kg 313.74 = 4.71 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 313.74 = 2.20 OH 1 hari = 2.20 oh
Tukang 0.007 OH 313.74 = 2.20 OH 1 hari = 2.20 oh
Kepala tukang 0.007 OH 313.74 = 2.20 OH 1 hari = 2.20 oh
Mandor 0.000 OH 313.74 = 0.09 OH 1 hari = 0.09 oh
● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 2

Besi Beton Tul.memanjang 2x Ø10 mm-150 mm 313.740 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 313.74 = 329.43 Kg
kawat beton 0.015 Kg 313.74 = 4.71 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 313.74 = 2.20 OH 1 hari = 2.20 oh
Tukang 0.007 OH 313.74 = 2.20 OH 1 hari = 2.20 oh
Kepala tukang 0.007 OH 313.74 = 2.20 OH 1 hari = 2.20 oh
Mandor 0.000 OH 313.74 = 0.09 OH 1 hari = 0.09 oh
● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 2

Bekisting Lantai 65.800 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.030 M3 65.80 = 1.97 M3
Paku 5 cm- 10 cm 0.300 Kg 65.80 = 19.74 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.520 OH 65.80 = 34.22 OH 7 hari = 4.89 oh
Tukang 0.260 OH 65.80 = 17.11 OH 7 hari = 2.44 oh
Kepala tukang 0.026 OH 65.80 = 1.71 OH 7 hari = 0.24 oh
Mandor 0.026 OH 65.80 = 1.71 OH 7 hari = 0.24 oh
● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 2

Pengadaan dan Pemasangan Pemasangan Karet Dilatasi 40.000 m1


Bahan : Koef. Volume Jumlah
Karet Dilatasi 1.020 M 65.80 = 1.97 M
Alat bantu 1.000 Ls 65.80 = 19.74 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.025 oh 65.80 = 34.22 OH 7 hari = 4.89 oh
Tukang 0.025 oh 65.80 = 17.11 OH 7 hari = 2.44 oh
Kepala Tukang 0.002 oh 65.80 = 1.71 OH 7 hari = 0.24 oh
Mandor 0.001 oh 65.80 = 1.71 OH 7 hari = 0.24 oh
● Rencana Waktu Pelaksanaan : Minggu ke 2 s/d minggu ke 2
IV PEKERJAAN BETON LANTAI 1
Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 26.18 m3
Beton Mutu K-250 26.180 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 26.18 = 26.18
Alat bantu 1.000 m3 26.18 = 26.18
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4
Besi Beton 4Ø10mm 3,268.311 kg
Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 3268.31 = 3,431.73 Kg
kawat beton 0.015 m3 3268.31 = 49.02 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 3268.31 = 22.88 OH 3 hari = 7.63 oh
Tukang 0.007 OH 3268.31 = 22.88 OH 3 hari = 7.63 oh
Kepala tukang 0.007 OH 3268.31 = 22.88 OH 3 hari = 7.63 oh
Mandor 0.000 OH 3268.31 = 0.98 OH 3 hari = 0.33 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 3

Besi Beton Cincin Ø20mm-(100 s/d 200)mm 647.955 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 647.96 = 680.35 Kg
kawat beton 0.015 m3 647.96 = 9.72 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 647.96 = 4.54 OH 3 hari = 1.51 oh
Tukang 0.007 OH 647.96 = 4.54 OH 3 hari = 1.51 oh
Kepala tukang 0.007 OH 647.96 = 4.54 OH 3 hari = 1.51 oh
Mandor 0.000 OH 647.96 = 0.19 OH 3 hari = 0.06 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 3

Bekisting kolom 233.002 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 1.050 Kg 233.00 = 244.65 Kg
Paku 5 cm-12cm 0.015 m3 233.00 = 3.50 m3
Balok kayu kelas lII 0.007 m3 233.00 = 1.63 m3
Plywood Tebal 9mm
Stoowerk kayu kelas lII 0.007 Liter 16.29 = 0.11 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.660 OH 233.00 = 153.78 OH 7 hari = 21.97 oh
Tukang 0.330 OH 233.00 = 76.89 OH 7 hari = 10.98 oh
Kepala tukang 0.033 OH 233.00 = 7.69 OH 7 hari = 1.10 oh
Mandor 0.033 OH 233.00 = 7.69 OH 7 hari = 1.10 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Cor Beton Plat Tangga + Bordes, K-250 dan Perbaikan Bekisting existing 18.00 m3
Beton Mutu K-250 18.000 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 18.00 = 18.00
Alat bantu 1.000 m3 18.00 = 18.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
Rencana Waktu Pelaksanaan : Minggu ke 4 s/d minggu ke 4

Besi Beton Bawah Melintang Ø12MM-150 mm 1,203.750 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 1203.75 = 1,203.75
kawat beton 1.000 Kg 1203.75 = 1,203.75
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 1203.75 = 8.43 OH 4 hari = 2.11 oh
Tukang 0.007 OH 1203.75 = 8.43 OH 4 hari = 2.11 oh
Kepala tukang 0.007 OH 1203.75 = 8.43 OH 4 hari = 2.11 oh
Mandor 0.000 OH 1203.75 = 0.36 OH 4 hari = 0.09 oh

● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Besi Beton Bawah Memanjang Ø12MM-150 mm 1,062.332 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 1062.33 = 1,062.33
kawat beton 1.000 Kg 1062.33 = 1,062.33
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 1062.33 = 7.44 OH 4 hari = 1.86 oh
Tukang 0.007 OH 1062.33 = 7.44 OH 4 hari = 1.86 oh
Kepala tukang 0.007 OH 1062.33 = 7.44 OH 4 hari = 1.86 oh
Mandor 0.000 OH 1062.33 = 0.32 OH 4 hari = 0.08 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Besi Beton Atas Melintang Ø10MM-150 mm 832.500 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 832.50 = 832.50
kawat beton 1.000 Kg 832.50 = 832.50
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 832.50 = 5.83 OH 4 hari = 1.46 oh
Tukang 0.007 OH 832.50 = 5.83 OH 4 hari = 1.46 oh
Kepala tukang 0.007 OH 832.50 = 5.83 OH 4 hari = 1.46 oh
Mandor 0.000 OH 832.50 = 0.25 OH 4 hari = 0.06 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Besi Beton Step melintang Ø8MM-150 mm 28.440 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 28.44 = 28.44
kawat beton 1.000 Kg 28.44 = 28.44
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 28.44 = 0.20 OH 4 hari = 0.05 oh
Tukang 0.007 OH 28.44 = 0.20 OH 4 hari = 0.05 oh
Kepala tukang 0.007 OH 28.44 = 0.20 OH 4 hari = 0.05 oh
Mandor 0.000 OH 28.44 = 0.01 OH 4 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Besi Beton Step memanjang Ø8MM-150 mm 71.100 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 71.10 = 71.10
kawat beton 1.000 Kg 71.10 = 71.10
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 71.10 = 0.50 OH 4 hari = 0.12 oh
Tukang 0.007 OH 71.10 = 0.50 OH 4 hari = 0.12 oh
Kepala tukang 0.007 OH 71.10 = 0.50 OH 4 hari = 0.12 oh
Mandor 0.000 OH 71.10 = 0.02 OH 4 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Bekisting Step Tangga 150.000 m2


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 150.00 = 150.00
kawat beton 1.000 Kg 150.00 = 150.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 150.00 = 1.05 OH 4 hari = 0.26 oh
Tukang 0.007 OH 150.00 = 1.05 OH 4 hari = 0.26 oh
Kepala tukang 0.007 OH 150.00 = 1.05 OH 4 hari = 0.26 oh
Mandor 0.000 OH 150.00 = 0.05 OH 4 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Bekisting Plat Tangga 180.000 m2


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 180.00 = 180.00
kawat beton 1.000 Kg 180.00 = 180.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 180.00 = 1.26 OH 4 hari = 0.32 oh
Tukang 0.007 OH 180.00 = 1.26 OH 4 hari = 0.32 oh
Kepala tukang 0.007 OH 180.00 = 1.26 OH 4 hari = 0.32 oh
Mandor 0.000 OH 180.00 = 0.05 OH 4 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Cor Beton Plat Tangga Darurat+ Bordes, K-250 dan Perbaikan Bekisting existing 8.64 m1
Beton Mutu K-250 8.640 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 8.64 = 8.64
Alat bantu 1.000 m3 8.64 = 8.64
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
Rencana Waktu Pelaksanaan : Minggu ke 4 s/d minggu ke 4

Besi Beton Bawah Melintang Ø12MM-150 mm 577.800 Kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 577.80 = 577.80
kawat beton 1.000 Kg 577.80 = 577.80
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 577.80 = 4.04 OH 4 hari = 1.01 oh
Tukang 0.007 OH 577.80 = 4.04 OH 4 hari = 1.01 oh
Kepala tukang 0.007 OH 577.80 = 4.04 OH 4 hari = 1.01 oh
Mandor 0.000 OH 577.80 = 0.17 OH 4 hari = 0.04 oh

Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Besi Beton Bawah Memanjang Ø12MM-150 mm 509.919 Kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 509.92 = 509.92
kawat beton 1.000 Kg 509.92 = 509.92
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 509.92 = 3.57 OH 4 hari = 0.89 oh
Tukang 0.007 OH 509.92 = 3.57 OH 4 hari = 0.89 oh
Kepala tukang 0.007 OH 509.92 = 3.57 OH 4 hari = 0.89 oh
Mandor 0.000 OH 509.92 = 0.15 OH 4 hari = 0.04 oh
Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Besi Beton Atas Melintang Ø10MM-150 mm 399.600 Kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 399.60 = 399.60
kawat beton 1.000 Kg 399.60 = 399.60
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 399.60 = 2.80 OH 4 hari = 0.70 oh
Tukang 0.007 OH 399.60 = 2.80 OH 4 hari = 0.70 oh
Kepala tukang 0.007 OH 399.60 = 2.80 OH 4 hari = 0.70 oh
Mandor 0.000 OH 399.60 = 0.12 OH 4 hari = 0.03 oh
Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Besi Beton Step melintang Ø8MM-150 mm 13.651 Kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 13.65 = 13.65
kawat beton 1.000 Kg 13.65 = 13.65
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 13.65 = 0.10 OH 4 hari = 0.02 oh
Tukang 0.007 OH 13.65 = 0.10 OH 4 hari = 0.02 oh
Kepala tukang 0.007 OH 13.65 = 0.10 OH 4 hari = 0.02 oh
Mandor 0.000 OH 13.65 = 0.00 OH 4 hari = 0.00 oh
Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Besi Beton Step memanjang Ø8MM-150 mm 34.128 Kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 34.13 = 34.13
kawat beton 1.000 Kg 34.13 = 34.13
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 34.13 = 0.24 OH 4 hari = 0.06 oh
Tukang 0.007 OH 34.13 = 0.24 OH 4 hari = 0.06 oh
Kepala tukang 0.007 OH 34.13 = 0.24 OH 4 hari = 0.06 oh
Mandor 0.000 OH 34.13 = 0.01 OH 4 hari = 0.00 oh
Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Bekisting Step Tangga 72.000 M2


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 72.00 = 72.00
kawat beton 1.000 Kg 72.00 = 72.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 72.00 = 0.50 OH 4 hari = 0.13 oh
Tukang 0.007 OH 72.00 = 0.50 OH 4 hari = 0.13 oh
Kepala tukang 0.007 OH 72.00 = 0.50 OH 4 hari = 0.13 oh
Mandor 0.000 OH 72.00 = 0.02 OH 4 hari = 0.01 oh
Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Bekisting Plat Tangga 86.400 M2


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 86.40 = 86.40
kawat beton 1.000 Kg 86.40 = 86.40
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 86.40 = 0.60 OH 4 hari = 0.15 oh
Tukang 0.007 OH 86.40 = 0.60 OH 4 hari = 0.15 oh
Kepala tukang 0.007 OH 86.40 = 0.60 OH 4 hari = 0.15 oh
Mandor 0.000 OH 86.40 = 0.03 OH 4 hari = 0.01 oh
Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Pek. Beton Meja t=10cm, K-250 51.24 m3


Beton Mutu K-175 51.240 m3
Bahan : Koef. Volume Jumlah
Portland Cement 210.000 Kg 51.24 = 10,760.40 Kg
Pasir Beton 0.300 m3 51.24 = 15.37 m3
KR maks. 30 mm 0.500 m3 51.24 = 25.62 m3
Air 215.000 Liter 51.24 = 11,016.60 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 1.650 OH 51.24 = 84.55 OH 1 hari = 84.55 oh
Tukang 0.275 OH 51.24 = 14.09 OH 1 hari = 14.09 oh
Kepala tukang 0.028 OH 51.24 = 1.43 OH 1 hari = 1.43 oh
Mandor 0.083 OH 51.24 = 4.25 OH 1 hari = 4.25 oh
● Rencana Waktu Pelaksanaan : Minggu ke 5 s/d minggu ke 6

Besi Beton Tul.melintang 2x Ø8mm-150 mm 3,373.300 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 3373.30 = 3,373.30
kawat beton 1.000 Kg 3373.30 = 3,373.30
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 3373.30 = 23.61 OH 4 hari = 5.90 oh
Tukang 0.007 OH 3373.30 = 23.61 OH 4 hari = 5.90 oh
Kepala tukang 0.007 OH 3373.30 = 23.61 OH 4 hari = 5.90 oh
Mandor 0.000 OH 3373.30 = 1.01 OH 4 hari = 0.25 oh

● Rencana Waktu Pelaksanaan : Minggu ke 4 s/d minggu ke 5

Bekisting Lantai 630.252 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.030 M3 630.25 = 18.91 M3
Paku 5 cm- 10 cm 0.300 Kg 630.25 = 189.08 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.520 OH 630.25 = 327.73 OH 28 hari = 11.70 oh
Tukang 0.260 OH 630.25 = 163.87 OH 28 hari = 5.85 oh
Kepala tukang 0.026 OH 630.25 = 16.39 OH 28 hari = 0.59 oh
Mandor 0.026 OH 630.25 = 16.39 OH 28 hari = 0.59 oh
● Rencana Waktu Pelaksanaan : Minggu ke 4 s/d minggu ke 5

Pengadaan dan Pemasangan Pemasangan Karet Dilatasi 60 m1


Bahan : Koef. Volume Jumlah
Karet Dilatasi 1.020 M 60.00 = 61.20 M
Alat bantu 1.000 Ls 60.00 = 60.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.025 oh 60.00 = 1.50 OH 1 hari = 1.50 oh
Tukang 0.025 oh 60.00 = 1.50 OH 1 hari = 2.44 oh
Kepala Tukang 0.002 oh 60.00 = 0.12 OH 1 hari = 0.24 oh
Mandor 0.001 oh 60.00 = 0.06 OH 1 hari = 0.24 oh
● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

II PEKERJAAN BETON LANTAI 2


Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 29.98 m3
Beton Mutu K-250 29.980 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 29.98 = 29.98
Alat bantu 1.000 m3 29.98 = 29.98
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = 1.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 7
Besi Beton 4Ø10mm 3,742.703 kg
Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 3742.70 = 3,929.84 Kg
kawat beton 0.015 m3 3742.70 = 56.14 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 3742.70 = 26.20 OH 7 hari = 3.74 oh
Tukang 0.007 OH 3742.70 = 26.20 OH 7 hari = 3.74 oh
Kepala tukang 0.007 OH 3742.70 = 26.20 OH 7 hari = 3.74 oh
Mandor 0.000 OH 3742.70 = 1.12 OH 7 hari = 0.16 oh
● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6
Besi Beton Cincin Ø20mm-(100 s/d 200)mm 742.005 kg
Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 742.01 = 779.11 Kg
kawat beton 0.015 m3 742.01 = 11.13 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 742.01 = 5.19 OH 3 hari = 1.73 oh
Tukang 0.007 OH 742.01 = 5.19 OH 3 hari = 1.73 oh
Kepala tukang 0.007 OH 742.01 = 5.19 OH 3 hari = 1.73 oh
Mandor 0.000 OH 742.01 = 0.22 OH 3 hari = 0.07 oh
● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

Bekisting kolom 266.822 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 1.050 Kg 266.82 = 280.16 Kg
Paku 5 cm-12cm 0.015 m3 266.82 = 4.00 m3
Balok kayu kelas lII 0.007 m3 266.82 = 1.87 m3
Plywood Tebal 9mm
Stoowerk kayu kelas lII 0.007 Liter 16.29 = 0.11 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.660 OH 266.82 = 176.10 OH 9 hari = 19.57 oh
Tukang 0.330 OH 266.82 = 88.05 OH 9 hari = 9.78 oh
Kepala tukang 0.033 OH 266.82 = 8.81 OH 9 hari = 0.98 oh
Mandor 0.033 OH 266.82 = 8.81 OH 9 hari = 0.98 oh
● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

Cor Beton Kolom Struktur K1 45/45, K-300 Perbaikan Bekisting existing 14.58 m3
Beton Mutu K-300 14.580 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.300 1.000 m3 14.58 = 14.58
Alat bantu 1.000 m3 14.58 = 14.58
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = 1.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 9

Besi Beton 16D16mm 1,820.167 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 1820.17 = 1,911.18 Kg
kawat beton 0.015 m3 1820.17 = 27.30 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 1820.17 = 12.74 OH 7 hari = 1.82 oh
Tukang 0.007 OH 1820.17 = 12.74 OH 7 hari = 1.82 oh
Kepala tukang 0.007 OH 1820.17 = 12.74 OH 7 hari = 1.82 oh
Mandor 0.000 OH 1820.17 = 0.55 OH 7 hari = 0.08 oh
● Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 8

Besi Beton Cincin D13mm-(100)mm 360.855 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 360.86 = 378.90 Kg
kawat beton 0.015 m3 360.86 = 5.41 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 360.86 = 2.53 OH 7 hari = 0.36 oh
Tukang 0.007 OH 360.86 = 2.53 OH 7 hari = 0.36 oh
Kepala tukang 0.007 OH 360.86 = 2.53 OH 7 hari = 0.36 oh
Mandor 0.000 OH 360.86 = 0.11 OH 7 hari = 0.02 oh
● Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 8

Bekisting kolom 142.592 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 1.050 Kg 142.59 = 149.72 Kg
Paku 5 cm-12cm 0.015 m3 142.59 = 2.14 m3
Balok kayu kelas lII 0.007 m3 142.59 = 1.00 m3
Plywood Tebal 9mm
Stoowerk kayu kelas lII 0.007 Liter 16.29 = 0.11 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.660 OH 142.59 = 94.11 OH 9 hari = 10.46 oh
Tukang 0.330 OH 142.59 = 47.06 OH 9 hari = 5.23 oh
Kepala tukang 0.033 OH 142.59 = 4.71 OH 9 hari = 0.52 oh
Mandor 0.033 OH 142.59 = 4.71 OH 9 hari = 0.52 oh
● Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 8

Cor Beton Kolom Struktur K2 35/45, K-300 Perbaikan Bekisting existing 11.78 m3
Beton Mutu K-300 11.780 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.300 1.000 m3 11.78 = 11.78
Alat bantu 1.000 m3 11.78 = 11.78
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = 1.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 9

Besi Beton 16D16mm 1,890.714 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 1890.71 = 1,985.25 Kg
kawat beton 0.015 m3 1890.71 = 28.36 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 1890.71 = 13.23 OH 7 hari = 1.89 oh
Tukang 0.007 OH 1890.71 = 13.23 OH 7 hari = 1.89 oh
Kepala tukang 0.007 OH 1890.71 = 13.23 OH 7 hari = 1.89 oh
Mandor 0.000 OH 1890.71 = 0.57 OH 7 hari = 0.08 oh
● Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 8

Besi Beton Cincin D13mm-(100)mm 1,159.034 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 1159.03 = 1,216.99 Kg
kawat beton 0.015 m3 1159.03 = 17.39 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 1159.03 = 8.11 OH 7 hari = 1.16 oh
Tukang 0.007 OH 1159.03 = 8.11 OH 7 hari = 1.16 oh
Kepala tukang 0.007 OH 1159.03 = 8.11 OH 7 hari = 1.16 oh
Mandor 0.000 OH 1159.03 = 0.35 OH 7 hari = 0.05 oh
● Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 8

Bekisting kolom 107.905 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 1.050 Kg 107.90 = 113.30 Kg
Paku 5 cm-12cm 0.015 m3 107.90 = 1.62 m3
Balok kayu kelas lII 0.007 m3 107.90 = 0.76 m3
Plywood Tebal 9mm
Stoowerk kayu kelas lII 0.007 Liter 16.29 = 0.11 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.660 OH 107.90 = 71.22 OH 9 hari = 7.91 oh
Tukang 0.330 OH 107.90 = 35.61 OH 9 hari = 3.96 oh
Kepala tukang 0.033 OH 107.90 = 3.56 OH 9 hari = 0.40 oh
Mandor 0.033 OH 107.90 = 3.56 OH 9 hari = 0.40 oh
● Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 9

Pengadaan dan Pemasangan Pemasangan Karet Dilatasi 60.00 m1


Bahan : Koef. Volume Jumlah
Karet Dilatasi 1.020 M 60.00 = 61.20 M
Alat bantu 1.000 Ls 60.00 = 60.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.025 oh 60.00 = 1.50 OH 1 hari = 1.50 oh
Tukang 0.025 oh 60.00 = 1.50 OH 1 hari = 2.44 oh
Kepala Tukang 0.002 oh 60.00 = 0.12 OH 1 hari = 0.24 oh
Mandor 0.001 oh 60.00 = 0.06 OH 1 hari = 0.24 oh
● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

VI PEKERJAAN BETON DAK ATAP


Cor Beton Talang Beton t= 12 cm, K-250 dan Perbaikan Bekisting existing 27 m3
Beton Mutu K-250 27.000 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 27.00 = 27.00
Alat bantu 1.000 m3 27.00 = 27.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Besi Beton Tul.melintang 2x Ø 10 mm-100 mm 2230 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 2229.77 = 2,341.26 Kg
kawat beton 0.015 m3 2229.77 = 33.45 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 2229.77 = 15.61 OH 3 hari = 5.20 oh
Tukang 0.007 OH 2229.77 = 15.61 OH 3 hari = 5.20 oh
Kepala tukang 0.007 OH 2229.77 = 15.61 OH 3 hari = 5.20 oh
Mandor 0.000 OH 2229.77 = 0.67 OH 3 hari = 0.22 oh
● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

Besi Beton Tul.memanjang 2x Ø10 mm-150 mm 1561 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 1560.84 = 1,638.89 Kg
kawat beton 0.015 m3 1560.84 = 23.41 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 1560.84 = 10.93 OH 3 hari = 3.64 oh
Tukang 0.007 OH 1560.84 = 10.93 OH 3 hari = 3.64 oh
Kepala tukang 0.007 OH 1560.84 = 10.93 OH 3 hari = 3.64 oh
Mandor 0.000 OH 1560.84 = 0.47 OH 3 hari = 0.16 oh
● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

Bekisting Lantai 225.6 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.030 M3 225.60 = 6.77 M3
Paku 5 cm- 10 cm 0.300 Kg 225.60 = 67.68 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.520 OH 225.60 = 117.31 OH 14.00 hari = 8.38 oh
Tukang 0.260 OH 225.60 = 58.66 OH 14.00 hari = 4.19 oh
Kepala tukang 0.026 OH 225.60 = 5.87 OH 14.00 hari = 0.42 oh
Mandor 0.026 OH 225.60 = 5.87 OH 14.00 hari = 0.42 oh
● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 10

Cor Beton Plat Dak Atap t= 15 cm, K-250 Landasan Tangki Air Pek dan Perbaikan Bekisting existing 10.8 m3
Beton Mutu K-250 27.000 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 27.00 = 27.00
Alat bantu 1.000 m3 27.00 = 27.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton Tul.melintang 2x Ø 10 mm-100 mm 891.9 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 891.91 = 936.50 Kg
kawat beton 0.015 m3 891.91 = 13.38 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 891.91 = 6.24 OH 3 hari = 2.08 oh
Tukang 0.007 OH 891.91 = 6.24 OH 3 hari = 2.08 oh
Kepala tukang 0.007 OH 891.91 = 6.24 OH 3 hari = 2.08 oh
Mandor 0.000 OH 891.91 = 0.27 OH 3 hari = 0.09 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Besi Beton Tul.memanjang 2x Ø10 mm-150 mm 624.3 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 624.34 = 655.55 Kg
kawat beton 0.015 m3 624.34 = 9.37 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 624.34 = 4.37 OH 3 hari = 1.46 oh
Tukang 0.007 OH 624.34 = 4.37 OH 3 hari = 1.46 oh
Kepala tukang 0.007 OH 624.34 = 4.37 OH 3 hari = 1.46 oh
Mandor 0.000 OH 624.34 = 0.19 OH 3 hari = 0.06 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Bekisting Lantai 90.24 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.030 M3 90.24 = 2.71 M3
Paku 5 cm- 10 cm 0.300 Kg 90.24 = 27.07 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.520 OH 90.24 = 46.92 OH 14.00 hari = 3.35 oh
Tukang 0.260 OH 90.24 = 23.46 OH 14.00 hari = 1.68 oh
Kepala tukang 0.026 OH 90.24 = 2.35 OH 14.00 hari = 0.17 oh
Mandor 0.026 OH 90.24 = 2.35 OH 14.00 hari = 0.17 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Cor Beton Balok Struktur B1a 30/60, K-250 dan Perbaikan Bekisting existing 62.21 m3
Beton Mutu K - 250 62.210 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 62.21 = 62.21
Alat bantu 1.000 m3 62.21 = 62.21
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton 12D16mm 3,007.729 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 3007.73 = 3,158.12 Kg
kawat beton 0.015 m3 3007.73 = 45.12 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 3007.73 = 21.05 OH 7 hari = 3.01 oh
Tukang 0.007 OH 3007.73 = 21.05 OH 7 hari = 3.01 oh
Kepala tukang 0.007 OH 3007.73 = 21.05 OH 7 hari = 3.01 oh
Mandor 0.000 OH 3007.73 = 0.90 OH 7 hari = 0.13 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Besi Beton 2D16mm 1,091.039 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 1091.04 = 1,145.59 Kg
kawat beton 0.015 m3 1091.04 = 16.37 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 1091.04 = 7.64 OH 7 hari = 1.09 oh
Tukang 0.007 OH 1091.04 = 7.64 OH 7 hari = 1.09 oh
Kepala tukang 0.007 OH 1091.04 = 7.64 OH 7 hari = 1.09 oh
Mandor 0.000 OH 1091.04 = 0.33 OH 7 hari = 0.05 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Besi Beton Cincin D13mm-(125-250 )mm 975.328 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 975.33 = 1,024.09 Kg
kawat beton 0.015 m3 975.33 = 14.63 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 975.33 = 6.83 OH 3 hari = 2.28 oh
Tukang 0.007 OH 975.33 = 6.83 OH 3 hari = 2.28 oh
Kepala tukang 0.007 OH 975.33 = 6.83 OH 3 hari = 2.28 oh
Mandor 0.000 OH 975.33 = 0.29 OH 3 hari = 0.10 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Bekisting Balok 517.898 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.034 m3 517.90 = 17.61 Kg
Paku 5 cm-12cm 0.400 kg 517.90 = 207.16 Kg
Balok kayu kelas lII 0.010 m3 517.90 = 5.18 Kg
Plywood Tebal 9mm 0.350 Lbr 517.90 = 181.26 Kg
Perancah kayu kelas lII 0.056 m3 517.90 = 29.00 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.660 OH 517.90 = 341.81 OH 28 hari = 12.21 oh
Tukang 0.330 OH 517.90 = 170.91 OH 28 hari = 6.10 oh
Kepala tukang 0.033 OH 517.90 = 17.09 OH 28 hari = 0.61 oh
Mandor 0.033 OH 517.90 = 17.09 OH 28 hari = 0.61 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Cor Beton Balok Struktur B1b 30/60 , K-250 dan Perbaikan Bekisting existing 4.58 m3
Beton Mutu K - 250 4.580 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 4.58 = 4.58
Alat bantu 1.000 m3 4.58 = 4.58
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton 12D16mm 221.434 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 221.43 = 232.51 Kg
kawat beton 0.015 m3 221.43 = 3.32 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 221.43 = 1.55 OH 7 hari = 0.22 oh
Tukang 0.007 OH 221.43 = 1.55 OH 7 hari = 0.22 oh
Kepala tukang 0.007 OH 221.43 = 1.55 OH 7 hari = 0.22 oh
Mandor 0.000 OH 221.43 = 0.07 OH 7 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10
Besi Beton 2D16mm 80.324 kg
Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 80.32 = 84.34 Kg
kawat beton 0.015 m3 80.32 = 1.20 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 80.32 = 0.56 OH 7 hari = 0.08 oh
Tukang 0.007 OH 80.32 = 0.56 OH 7 hari = 0.08 oh
Kepala tukang 0.007 OH 80.32 = 0.56 OH 7 hari = 0.08 oh
Mandor 0.000 OH 80.32 = 0.02 OH 7 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Besi Beton Cincin D13mm-(125-250 )mm 71.805 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 71.81 = 75.40 Kg
kawat beton 0.015 m3 71.81 = 1.08 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 71.81 = 0.50 OH 3 hari = 0.17 oh
Tukang 0.007 OH 71.81 = 0.50 OH 3 hari = 0.17 oh
Kepala tukang 0.007 OH 71.81 = 0.50 OH 3 hari = 0.17 oh
Mandor 0.000 OH 71.81 = 0.02 OH 3 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Bekisting Balok 38.129 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.034 m3 38.13 = 1.30 Kg
Paku 5 cm-12cm 0.400 kg 38.13 = 15.25 Kg
Balok kayu kelas lII 0.010 m3 38.13 = 0.38 Kg
Plywood Tebal 9mm 0.350 Lbr 38.13 = 13.34 Kg
Perancah kayu kelas lII 0.056 m3 38.13 = 2.14 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.660 OH 38.13 = 25.16 OH 28 hari = 0.90 oh
Tukang 0.330 OH 38.13 = 12.58 OH 28 hari = 0.45 oh
Kepala tukang 0.033 OH 38.13 = 1.26 OH 28 hari = 0.04 oh
Mandor 0.033 OH 38.13 = 1.26 OH 28 hari = 0.04 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Cor Beton Balok Struktur B2 25/45, K-250 dan Perbaikan Bekisting existing 11.88 m3
Beton Mutu K - 250 11.880 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 11.88 = 11.88
Alat bantu 1.000 m3 11.88 = 11.88
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton 12D16mm 574.374 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 574.37 = 603.09 Kg
kawat beton 0.015 m3 574.37 = 8.62 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 574.37 = 4.02 OH 7 hari = 0.57 oh
Tukang 0.007 OH 574.37 = 4.02 OH 7 hari = 0.57 oh
Kepala tukang 0.007 OH 574.37 = 4.02 OH 7 hari = 0.57 oh
Mandor 0.000 OH 574.37 = 0.17 OH 7 hari = 0.02 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Besi Beton 2D16mm 208.351 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 208.35 = 218.77 Kg
kawat beton 0.015 m3 208.35 = 3.13 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 208.35 = 1.46 OH 7 hari = 0.21 oh
Tukang 0.007 OH 208.35 = 1.46 OH 7 hari = 0.21 oh
Kepala tukang 0.007 OH 208.35 = 1.46 OH 7 hari = 0.21 oh
Mandor 0.000 OH 208.35 = 0.06 OH 7 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Besi Beton Cincin D13mm-(125-250 )mm 186.255 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 186.25 = 195.57 Kg
kawat beton 0.015 m3 186.25 = 2.79 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 186.25 = 1.30 OH 3 hari = 0.43 oh
Tukang 0.007 OH 186.25 = 1.30 OH 3 hari = 0.43 oh
Kepala tukang 0.007 OH 186.25 = 1.30 OH 3 hari = 0.43 oh
Mandor 0.000 OH 186.25 = 0.06 OH 3 hari = 0.02 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Bekisting Balok 98.901 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.034 m3 98.90 = 3.36 Kg
Paku 5 cm-12cm 0.400 kg 98.90 = 39.56 Kg
Balok kayu kelas lII 0.010 m3 98.90 = 0.99 Kg
Plywood Tebal 9mm 0.350 Lbr 98.90 = 34.62 Kg
Perancah kayu kelas lII 0.056 m3 98.90 = 5.54 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.660 OH 98.90 = 65.27 OH 28 hari = 2.33 oh
Tukang 0.330 OH 98.90 = 32.64 OH 28 hari = 1.17 oh
Kepala tukang 0.033 OH 98.90 = 3.26 OH 28 hari = 0.12 oh
Mandor 0.033 OH 98.90 = 3.26 OH 28 hari = 0.12 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Cor Beton Balok Struktur B3 25/45, K-250 dan Perbaikan Bekisting existing 16.9 m3
Beton Mutu K - 250 16.900 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 16.90 = 16.90
Alat bantu 1.000 m3 16.90 = 16.90
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton 12D16mm 817.081 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 817.08 = 857.94 Kg
kawat beton 0.015 m3 817.08 = 12.26 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 817.08 = 5.72 OH 7 hari = 0.82 oh
Tukang 0.007 OH 817.08 = 5.72 OH 7 hari = 0.82 oh
Kepala tukang 0.007 OH 817.08 = 5.72 OH 7 hari = 0.82 oh
Mandor 0.000 OH 817.08 = 0.25 OH 7 hari = 0.04 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Besi Beton 2D16mm 296.392 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 296.39 = 311.21 Kg
kawat beton 0.015 m3 296.39 = 4.45 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 296.39 = 2.07 OH 7 hari = 0.30 oh
Tukang 0.007 OH 296.39 = 2.07 OH 7 hari = 0.30 oh
Kepala tukang 0.007 OH 296.39 = 2.07 OH 7 hari = 0.30 oh
Mandor 0.000 OH 296.39 = 0.09 OH 7 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Besi Beton Cincin D13mm-(125-250 )mm 264.958 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 264.96 = 278.21 Kg
kawat beton 0.015 m3 264.96 = 3.97 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 264.96 = 1.85 OH 3 hari = 0.62 oh
Tukang 0.007 OH 264.96 = 1.85 OH 3 hari = 0.62 oh
Kepala tukang 0.007 OH 264.96 = 1.85 OH 3 hari = 0.62 oh
Mandor 0.000 OH 264.96 = 0.08 OH 3 hari = 0.03 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Bekisting Balok 140.693 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.034 m3 140.69 = 4.78 Kg
Paku 5 cm-12cm 0.400 kg 140.69 = 56.28 Kg
Balok kayu kelas lII 0.010 m3 140.69 = 1.41 Kg
Plywood Tebal 9mm 0.350 Lbr 140.69 = 49.24 Kg
Perancah kayu kelas lII 0.056 m3 140.69 = 7.88 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.660 OH 140.69 = 92.86 OH 14 hari = 6.63 oh
Tukang 0.330 OH 140.69 = 46.43 OH 14 hari = 3.32 oh
Kepala tukang 0.033 OH 140.69 = 4.64 OH 14 hari = 0.33 oh
Mandor 0.033 OH 140.69 = 4.64 OH 14 hari = 0.33 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Pengadaan dan Pemasangan Pemasangan Karet Dilatasi 30 m1


Bahan : Koef. Volume Jumlah
Karet Dilatasi 1.020 M 30.00 = 30.60 M
Alat bantu 1.000 Ls 30.00 = 30.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.025 oh 30.00 = 0.75 OH 1 hari = 0.75 oh
Tukang 0.025 oh 30.00 = 0.75 OH 1 hari = 0.75 oh
Kepala Tukang 0.002 oh 30.00 = 0.06 OH 1 hari = 0.06 oh
Mandor 0.001 oh 30.00 = 0.03 OH 1 hari = 0.03 oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

VII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP

Erection Kolom Baja WF.300.150.6,5.9 R1 1869.94 kg


Bahan : Volume Jumlah
Besi baja IWF 1.15 Kg 1869.94 = 2,150.43 Kg
Kawat las listrik 0.04 kg 1869.94 = 74.80 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.02 OH 1869.94 = 37.40 OH 14 hari = 2.67 oh
Tukang las konstruksi 0.02 OH 1869.94 = 37.40 OH 14 hari = 2.67 oh
Kepala Tukang 0.002 OH 1869.94 = 3.74 OH 14 hari = 0.27 oh
Mandor 0.001 OH 1869.94 = 1.87 OH 14 hari = 0.13 oh

● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Pengadaan dan Pemasangan Kolom Baja WF.300.150.6,5.9 R2 636.82 kg


Bahan : Volume Jumlah
Besi baja IWF 1.15 Kg 636.82 = 732.34 Kg
Kawat las listrik 0.04 kg 636.82 = 25.47 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.04 OH 636.82 = 25.47 OH 7 hari = 3.64 oh
Tukang las konstruksi 0.04 OH 636.82 = 25.47 OH 7 hari = 3.64 oh
Kepala Tukang 0.004 OH 636.82 = 2.55 OH 7 hari = 0.36 oh
Mandor 0.002 OH 636.82 = 1.27 OH 7 hari = 0.18 oh

● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Erection Kuda-kuda Baja WF 300.150.6,5.9 R1 7862.02 kg


Bahan : Volume Jumlah
Besi baja IWF 1.15 Kg 7862.02 = 9,041.32 Kg
Kawat las listrik 0.04 kg 7862.02 = 314.48 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.02 OH 7862.02 = 157.24 OH 21 hari = 7.49 oh
Tukang las konstruksi 0.02 OH 7862.02 = 157.24 OH 21 hari = 7.49 oh
Kepala Tukang 0.002 OH 7862.02 = 15.72 OH 21 hari = 0.75 oh
Mandor 0.001 OH 7862.02 = 7.86 OH 21 hari = 0.37 oh

● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 12

Erection Kuda-kuda Baja WF 300.150.6,5.9 R2 5048.75 kg


Bahan : Volume Jumlah
Besi baja IWF 1.15 Kg 5048.75 = 5,806.06 Kg
Kawat las listrik 0.04 kg 5048.75 = 201.95 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.02 OH 5048.75 = 100.98 OH 14 hari = 7.21 oh
Tukang las konstruksi 0.02 OH 5048.75 = 100.98 OH 14 hari = 7.21 oh
Kepala Tukang 0.002 OH 5048.75 = 10.10 OH 14 hari = 0.72 oh
Mandor 0.001 OH 5048.75 = 5.05 OH 14 hari = 0.36 oh

● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 12

Pengadaan dan Pemasangan Kuda-kuda Baja WF 150.75.5.7 R3 575.9 kg


Bahan : Volume Jumlah
Besi baja IWF 1.15 Kg 575.90 = 662.29 Kg
Kawat las listrik 0.04 kg 575.90 = 23.04 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.04 OH 575.90 = 23.04 OH 7 hari = 3.29 oh
Tukang las konstruksi 0.04 OH 575.90 = 23.04 OH 7 hari = 3.29 oh
Kepala Tukang 0.004 OH 575.90 = 2.30 OH 7 hari = 0.33 oh
Mandor 0.002 OH 575.90 = 1.15 OH 7 hari = 0.16 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Erection. Voute 1/2 WF 300.150.6,5.9 R1 dan R2 1310.63 kg


Bahan : Volume Jumlah
Besi baja IWF 1.15 Kg 1310.63 = 1,507.22 Kg
Kawat las listrik 0.04 kg 1310.63 = 52.43 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.02 OH 1310.63 = 26.21 OH 7 hari = 3.74 oh
Tukang las konstruksi 0.02 OH 1310.63 = 26.21 OH 7 hari = 3.74 oh
Kepala Tukang 0.002 OH 1310.63 = 2.62 OH 7 hari = 0.37 oh
Mandor 0.001 OH 1310.63 = 1.31 OH 7 hari = 0.19 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 13

Pengadaan dan Pemasangan Voute 1/2 WF 150.75.5.7 R3 215.04 kg


Bahan : Volume Jumlah
Besi baja IWF 1.15 Kg 215.04 = 247.30 Kg
Kawat las listrik 0.04 kg 215.04 = 8.60 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.04 OH 215.04 = 8.60 OH 1 hari = 8.60 oh
Tukang las konstruksi 0.04 OH 215.04 = 8.60 OH 1 hari = 8.60 oh
Kepala Tukang 0.004 OH 215.04 = 0.86 OH 1 hari = 0.86 oh
Mandor 0.002 OH 215.04 = 0.43 OH 1 hari = 0.43 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 13

Pengadaan dan Pemasangan Gording CNP .150.65.20.3,2 10850.4 kg


Bahan : Volume Jumlah
Besi baja IWF 1.15 Kg 10850.40 = 12,477.96 Kg
Kawat las listrik 0.04 kg 10850.40 = 434.02 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.04 OH 10850.40 = 434.02 OH 21 hari = 20.67 oh
Tukang las konstruksi 0.04 OH 10850.40 = 434.02 OH 21 hari = 20.67 oh
Kepala Tukang 0.004 OH 10850.40 = 43.40 OH 21 hari = 2.07 oh
Mandor 0.002 OH 10850.40 = 21.70 OH 21 hari = 1.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 14

Erection Besi L 70.70.7 Dudukan Gording 141.7 kg


Bahan : Volume Jumlah
Besi baja IWF 1.15 Kg 141.70 = 162.96 Kg
Kawat las listrik 0.04 kg 141.70 = 5.67 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.02 OH 141.70 = 2.83 OH 1 hari = 2.83 oh
Tukang las konstruksi 0.02 OH 141.70 = 2.83 OH 1 hari = 2.83 oh
Kepala Tukang 0.002 OH 141.70 = 0.28 OH 1 hari = 0.28 oh
Mandor 0.001 OH 141.70 = 0.14 OH 1 hari = 0.14 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 14

Pek Besi Plat Stifner t = 0,8 mm 207.24 kg


Bahan : Volume Jumlah
Besi baja IWF 1.15 Kg 207.24 = 238.33 Kg
Kawat las listrik 0.04 kg 207.24 = 8.29 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.02 OH 207.24 = 4.14 OH 1 hari = 4.14 oh
Tukang las konstruksi 0.02 OH 207.24 = 4.14 OH 1 hari = 4.14 oh
Kepala Tukang 0.002 OH 207.24 = 0.41 OH 1 hari = 0.41 oh
Mandor 0.001 OH 207.24 = 0.21 OH 1 hari = 0.21 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 14

Pengadaan dan Pemasangan Besi Trekstang Ø 12 mm 672.84 kg


Bahan : Volume Jumlah
Besi Beton Polos 1.15 Kg 672.84 = 773.77 Kg
Kawat las listrik 0.04 kg 672.84 = 26.91 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.06 OH 672.84 = 40.37 OH 1 hari = 40.37 oh
Tukang las konstruksi 0.06 OH 672.84 = 40.37 OH 1 hari = 40.37 oh
Kepala Tukang 0.006 OH 672.84 = 4.04 OH 1 hari = 4.04 oh
Mandor 0.003 OH 672.84 = 2.02 OH 1 hari = 2.02 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 14

Pengadaan dan Pemasangan Ikatan Angin Kuda kuda / Besi D 16 mm Ulir 1485.2 kg
Bahan : Volume Jumlah
Besi Beton Polos 1.15 Kg 1485.20 = 1,707.98 Kg
Kawat las listrik 0.04 kg 1485.20 = 59.41 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.06 OH 1485.20 = 89.11 OH 1 hari = 89.11 oh
Tukang las konstruksi 0.06 OH 1485.20 = 89.11 OH 1 hari = 89.11 oh
Kepala Tukang 0.006 OH 1485.20 = 8.91 OH 1 hari = 8.91 oh
Mandor 0.003 OH 1485.20 = 4.46 OH 1 hari = 4.46 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 14

Pek. Angker Baud + Mur HTB M 20 288 bh


Bahan : Volume Jumlah
Angker Baud 1 Kg 288.00 = 288.00 Kg
Kawat las listrik 0.04 kg 288.00 = 11.52 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.04 OH 288.00 = 11.52 OH 1 hari = 11.52 oh
Tukang las konstruksi 0.04 OH 288.00 = 11.52 OH 1 hari = 11.52 oh
Kepala Tukang 0.004 OH 288.00 = 1.15 OH 1 hari = 1.15 oh
Mandor 0.002 OH 288.00 = 0.58 OH 1 hari = 0.58 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 14

Pek. Base Plat t = 1,8 mm 541.24 kg


Bahan : Volume Jumlah
Besi baja IWF 1.15 Kg 541.24 = 622.43 Kg
Kawat las listrik 0.04 kg 541.24 = 21.65 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.02 OH 541.24 = 10.82 OH 1 hari = 10.82 oh
Tukang las konstruksi 0.02 OH 541.24 = 10.82 OH 1 hari = 10.82 oh
Kepala Tukang 0.002 OH 541.24 = 1.08 OH 1 hari = 1.08 oh
Mandor 0.001 OH 541.24 = 0.54 OH 1 hari = 0.54 oh

● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Pengadaan dan Pemasangan Beton Pedestal 45/45 K-250 2.92 m3


Beton Mutu K-250 1.000 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 1.00 = 1.00
Alat bantu 1.000 m3 1.00 = 1.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Besi Beton 6Ø12mm-(150)mm 53.040 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 53.04 = 55.69 Kg
kawat beton 0.015 m3 53.04 = 0.80 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 53.04 = 0.37 OH 3 hari = 0.12 oh
Tukang 0.007 OH 53.04 = 0.37 OH 3 hari = 0.12 oh
Kepala tukang 0.007 OH 53.04 = 0.37 OH 3 hari = 0.12 oh
Mandor 0.000 OH 53.04 = 0.02 OH 3 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Besi Beton Cincin Ø8mm-(150) mm 34.660 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 34.66 = 36.39 Kg
kawat beton 0.015 m3 34.66 = 0.52 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 34.66 = 0.24 OH 1 hari = 0.24 oh
Tukang 0.007 OH 34.66 = 0.24 OH 1 hari = 0.24 oh
Kepala tukang 0.007 OH 34.66 = 0.24 OH 1 hari = 0.24 oh
Mandor 0.000 OH 34.66 = 0.01 OH 1 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10
Bekisting Pondasi 10.000 m2
Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.030 M3 10.00 = 0.30 Kg
Paku 5 cm- 10 cm 0.300 Kg 10.00 = 3.00 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.520 OH 10.00 = 5.20 OH 1 hari = 5.20 oh
Tukang 0.260 OH 10.00 = 2.60 OH 1 hari = 2.60 oh
Kepala tukang 0.026 OH 10.00 = 0.26 OH 1 hari = 0.26 oh
Mandor 0.026 OH 10.00 = 0.26 OH 1 hari = 0.26 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Pengadaan dan Pemasangan Penutup Atap Bitumaen (Reff Produk Onduline) 2119.16 m2
Bahan : Koef. Volume Jumlah
Atap Bitumen Bergelombang Monolayer 3 mm 0.650 Lbr 2119.16 = 1,377.45 Kg
Paku atau Sekrup 9.100 bh 2119.16 = 19,284.36 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.140 OH 2119.16 = 296.68 OH 14 hari = 21.19 oh
Tukang 0.070 OH 2119.16 = 148.34 OH 14 hari = 10.60 oh
Kepala tukang 0.007 OH 2119.16 = 14.83 OH 14 hari = 1.06 oh
Mandor 0.007 OH 2119.16 = 14.83 OH 14 hari = 1.06 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 15

Pengadaan dan Pemasangan Pasang Nok Bitumen ( reff Produk Onduline ) 62 m'
Bahan : Koef. Volume Jumlah
Nok 1.000 Lbr 62.00 = 62.00 Kg
assesoris 1.000 bh 62.00 = 62.00 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja - OH 62.00 = - OH 7 hari = - oh
Tukang 0.200 OH 62.00 = 12.40 OH 7 hari = 1.77 oh
Kepala tukang - OH 62.00 = - OH 7 hari = - oh
Mandor - OH 62.00 = - OH 7 hari = - oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 15

Pengadaan dan Pemasangan Pasang Atap Solar flate Transparan 53.58 m2


Bahan : Koef. Volume Jumlah
Atap Solarflat 1.100 m2 53.58 = 58.94 Kg
Skrup 4.000 bh 53.58 = 214.32 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.100 OH 53.58 = 5.36 OH 7 hari = 0.77 oh
Tukang 0.100 OH 53.58 = 5.36 OH 7 hari = 0.77 oh
Kepala tukang 0.010 OH 53.58 = 0.54 OH 7 hari = 0.08 oh
Mandor 0.010 OH 53.58 = 0.54 OH 7 hari = 0.08 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Pengadaan dan Pemasangan Pas Pipa Rangka Atap Solar Flate Ø 2 " 21 m1
Bahan : Koef. Volume Jumlah
Besi Pipa 2" 2.72 kg 21.00 = 57.12 kg
Plat 10x10 mm 0.28 Kg 21.00 = 5.88 Kg
Asesoris 1 ls 21.00 = 21.00 ls
Finishing Cat Besi 1.1 m2 21.00 = 23.10 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang Pabrikasi Railling Tangga 1.000 Ls 21.00 = 21.00 OH 7 hari = 3.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 15

Pengadaan dan Pemasangan Pas Pipa Tiang Atap Solar Flate Ø 6 " 37.5 m1
Bahan : Koef. Volume Jumlah
Besi Pipa 6" 1.1 m' 37.50 = 41.25 kg
Asesoris 1 ls 37.50 = 37.50 ls
Finishing Cat Besi 0.05 m2 37.50 = 1.88 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang Pabrikasi Railling Tangga 1.000 Ls 37.50 = 37.50 OH 7 hari = 5.36 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 15

Pengadaan dan Pemasangan Pemasangan Karet Dilatasi 30 m1


Bahan : Koef. Volume Jumlah
Karet Dilatasi 1.020 M 30.00 = 30.60 M
Alat bantu 1.000 Ls 30.00 = 30.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.025 oh 30.00 = 0.75 OH 1 hari = 0.75 oh
Tukang 0.025 oh 30.00 = 0.75 OH 1 hari = 0.75 oh
Kepala Tukang 0.002 oh 30.00 = 0.06 OH 1 hari = 0.06 oh
Mandor 0.001 oh 30.00 = 0.03 OH 1 hari = 0.03 oh
● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

D PEKERJAAN ARSITEKTUR

I PEKERJAAN LANTAI BASEMENT / LANTAI DASAR (TAHAP BERIKUTNYA)

II PEKERJAAN LANTAI 1
PEKERJAAN DINDING, PLESTERAN, ACIAN
Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 3,732.56 m2
Bahan : Koef. Volume Jumlah
Bata merah 70 buah 3732.56 = 261,279.20 kg
Portland Cement 9.68 Kg 3732.56 = 36,131.18 ls
Pasir Pasang 0.045 m3 3732.56 = 167.97 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.300 OH 3732.56 = 1,119.77 OH 28 hari = 39.99 oh
Tukang batu 0.100 OH 3732.56 = 373.26 OH 28 hari = 13.33 oh
Kepala Tukang 0.010 OH 3732.56 = 37.33 OH 28 hari = 1.33 oh
Mandor 0.015 OH 3732.56 = 55.99 OH 28 hari = 2.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 4 s/d minggu ke 7

Pekerjaan plesteran dinding 1 : 5 7,465.120 m2


Bahan : Koef. Volume Jumlah
Semen Portland 7.290 Kg 7465.12 = 54,420.72 Kg
Pasir Pasang 0.028 M3 7465.12 = 209.02 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 oh 7465.12 = 746.51 OH 35 hari = 21.33 oh
Tukang 0.120 oh 7465.12 = 895.81 OH 35 hari = 25.59 oh
Kepala Tukang 0.020 oh 7465.12 = 149.30 OH 35 hari = 4.27 oh
Mandor 0.013 oh 7465.12 = 93.31 OH 35 hari = 2.67 oh
● Rencana Waktu Pelaksanaan : Minggu ke 5 s/d minggu ke 9

Pekerjaan acian dinding sampai setinggi 3 m dr lantai 5,772.000 m2


Bahan : Koef. Volume Jumlah
Semen Portland 4.000 Kg 5772.00 = 23,088.00 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.143 oh 5772.00 = 825.40 OH 35 hari = 23.58 oh
Tukang 0.107 oh 5772.00 = 617.60 OH 35 hari = 17.65 oh
Kepala Tukang 0.011 oh 5772.00 = 60.61 OH 35 hari = 1.73 oh
Mandor 0.010 oh 5772.00 = 57.72 OH 35 hari = 1.65 oh
● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 10

Pekerjaan Pas Ornamen Sirip Ikan (TAHAP BERIKUTNYA) 48.750 m2

PEKERJAAN LANTAI

Pek. Keramik Lantai uk. 40x40 2230.24 m2


Bahan : Koef. Volume Jumlah
Keramik 40 x 40 cm 1.000 M2 2230.24 = 2,230.24 M2
Semen portland 11.380 Kg 2230.24 = 25,380.13 Kg
Pasir pasang 0.042 M3 2230.24 = 93.67 M3
Semen warna 1.500 Kg 2230.24 = 3,345.36 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.620 oh 2230.24 = 1,382.75 OH 35 hari = 39.51 oh
Tukang 0.350 oh 2230.24 = 780.58 OH 35 hari = 22.30 oh
Kepala Tukang 0.035 oh 2230.24 = 78.06 OH 35 hari = 2.23 oh
Mandor 0.030 oh 2230.24 = 66.91 OH 35 hari = 1.91 oh
● Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 12

Pek. Keramik Lantai uk. 20x20 KM/WC 5.78 m2


Bahan : Koef. Volume Jumlah
Keramik 20 x 20 cm 1.000 M2 5.78 = 5.78 M2
Semen portland 11.380 Kg 5.78 = 65.78 Kg
Pasir pasang 0.042 M3 5.78 = 0.24 M3
Semen warna 1.500 Kg 5.78 = 8.67 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.620 oh 5.78 = 3.58 OH 1.00 hari = 3.58 oh
Tukang 0.350 oh 5.78 = 2.02 OH 1.00 hari = 2.02 oh
Kepala Tukang 0.035 oh 5.78 = 0.20 OH 1.00 hari = 0.20 oh
Mandor 0.030 oh 5.78 = 0.17 OH 1.00 hari = 0.17 oh
● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

Pek. Keramik Dinding 20x25 KM/WC 39.6 m2


Bahan : Koef. Volume Jumlah
Keramik 20 x 25 cm 1.000 M2 39.60 = 39.60 M2
Semen portland 11.380 Kg 39.60 = 450.65 Kg
Pasir pasang 0.042 M3 39.60 = 1.66 M3
Semen warna 1.500 Kg 39.60 = 59.40 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.620 oh 39.60 = 24.55 OH 3 hari = 8.18 oh
Tukang 0.350 oh 39.60 = 13.86 OH 3 hari = 4.62 oh
Kepala Tukang 0.035 oh 39.60 = 1.39 OH 3 hari = 0.46 oh
Mandor 0.030 oh 39.60 = 1.19 OH 3 hari = 0.40 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Pek. Plin Keramik uk. 10x40 858 m1


Bahan : Koef. Volume Jumlah
Keramik 10 x 30 cm 0.100 M2 858.00 = 85.80 M2
Semen portland 1.650 Kg 858.00 = 1,415.70 Kg
Pasir pasang 0.003 M3 858.00 = 2.75 M3
Semen warna 0.100 Kg 858.00 = 85.80 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.062 oh 858.00 = 53.20 OH 14 hari = 3.80 oh
Tukang 0.035 oh 858.00 = 30.03 OH 14 hari = 2.15 oh
Kepala Tukang 0.004 oh 858.00 = 3.00 OH 14 hari = 0.21 oh
Mandor 0.003 oh 858.00 = 2.57 OH 14 hari = 0.18 oh
● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 10

Pek. Keramik Dinding 20x20 Meja Beton sek. Mulia 149.52 m2


Bahan : Koef. Volume Jumlah
Keramik 20 x 25 cm 1.000 M2 149.52 = 149.52 M2
Semen portland 11.380 Kg 149.52 = 1,701.54 Kg
Pasir pasang 0.042 M3 149.52 = 6.28 M3
Semen warna 1.500 Kg 149.52 = 224.28 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.620 oh 149.52 = 92.70 OH 14 hari = 6.62 oh
Tukang 0.350 oh 149.52 = 52.33 OH 14 hari = 3.74 oh
Kepala Tukang 0.035 oh 149.52 = 5.23 OH 14 hari = 0.37 oh
Mandor 0.030 oh 149.52 = 4.49 OH 14 hari = 0.32 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Pek. Keramik Dinding 20x20 Kios tipe 5 sek. Mulia 171.84 m2


Bahan : Koef. Volume Jumlah
Keramik 20 x 25 cm 1.000 M2 171.84 = 171.84 M2
Semen portland 11.380 Kg 171.84 = 1,955.54 Kg
Pasir pasang 0.042 M3 171.84 = 7.22 M3
Semen warna 1.500 Kg 171.84 = 257.76 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.620 oh 171.84 = 106.54 OH 14 hari = 7.61 oh
Tukang 0.350 oh 171.84 = 60.14 OH 14 hari = 4.30 oh
Kepala Tukang 0.035 oh 171.84 = 6.01 OH 14 hari = 0.43 oh
Mandor 0.030 oh 171.84 = 5.16 OH 14 hari = 0.37 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

PEKERJAAN PLAFOND (TAHAP BERIKUTNYA)

PEKERJAAN CAT

Pekerjaan Pengecatan Dinding Interior + Kolom Beton, sek. Vinilex 5,426.40 m2


Bahan : Koef. Volume Jumlah
Cat dasar 0.200 Kg 5426.40 = 1,085.28 Kg
Cat penutup 2 x Vinilex 0.260 Kg 5426.40 = 1,410.86 Kg
Ampelas 0.100 Lbr 5426.40 = 542.64 Lbr
Roll Cat 0.025 Bh 5426.40 = 135.66 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.040 oh 5426.40 = 217.06 OH 14 hari = 15.50 oh
Tukang 0.080 oh 5426.40 = 434.11 OH 14 hari = 31.01 oh
Kepala Tukang 0.008 oh 5426.40 = 43.41 OH 14 hari = 3.10 oh
Mandor 0.005 oh 5426.40 = 27.13 OH 14 hari = 1.94 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 345.60 m2


Bahan : Koef. Volume Jumlah
Plamir 0.100 Kg 345.60 = 34.56 Kg
Cat dasar 0.100 Kg 345.60 = 34.56 Kg
Cat penutup 2 x 0.260 Kg 345.60 = 89.86 Kg
Ampelas 0.100 Lbr 345.60 = 34.56 Lbr
Roll Cat 0.025 Bh 345.60 = 8.64 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.040 oh 345.60 = 13.82 OH 14 hari = 0.99 oh
Tukang 0.080 oh 345.60 = 27.65 OH 14 hari = 1.97 oh
Kepala Tukang 0.008 oh 345.60 = 2.76 OH 14 hari = 0.20 oh
Mandor 0.005 oh 345.60 = 1.73 OH 14 hari = 0.12 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Pekerjaan Pengecatan Plafon Beton + Balok Ekspose, sek. Vinilex 2,290.02 m2


Bahan : Koef. Volume Jumlah
Plamir 0.050 Kg 2290.02 = 114.50 Kg
Cat dasar 0.100 Kg 2290.02 = 229.00 Kg
Cat penutup 2 x 0.260 Kg 2290.02 = 595.41 Kg
Ampelas 0.100 Lbr 2290.02 = 229.00 Lbr
Roll Cat 0.025 Bh 2290.02 = 57.25 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.040 oh 2290.02 = 91.60 OH 14 hari = 6.54 oh
Tukang 0.080 oh 2290.02 = 183.20 OH 14 hari = 13.09 oh
Kepala Tukang 0.008 oh 2290.02 = 18.32 OH 14 hari = 1.31 oh
Mandor 0.005 oh 2290.02 = 11.45 OH 14 hari = 0.82 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Pek. Laburan Waterproofing Cementitious Lantai KM/WC, sek. Sika 5.78 m2


Bahan : Koef. Volume Jumlah
Waterproofimg Cementitious 0.500 Kg 5.78 = 2.89 Kg
Ampelas 0.500 lbr 5.78 = 2.89 lbr
Kwas 3" 0.010 bh 5.78 = 0.06 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.020 oh 5.78 = 0.12 OH 14 hari = 0.01 oh
Tukang 0.200 oh 5.78 = 1.16 OH 14 hari = 0.08 oh
Kepala Tukang 0.020 oh 5.78 = 0.12 OH 14 hari = 0.01 oh
Mandor 0.010 oh 5.78 = 0.06 OH 14 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

PEKERJAAN KUSEN, PINTU, JENDELA, BV

Pek. Pas. Kusen, Pintu & Asesoris tipe P1 1.000 unit


Bahan : Koef. Volume Jumlah
Kusen Aluminium Natural 4" 6.700 M' 1.00 = 6.70 M'
Asesoris Kusen Alumunium (35% dr bahan ) 1.000 ls 1.00 = 1.00 ls
Daun Pintu Double Teakwood tipe D2 1.000 Unit 1.00 = 1.00 Unit
Kunci Silinder dan Body untuk pintu 1.000 Bh 1.00 = 1.00 Bh
Handle Pintu Stainless Steel 2.000 Psg 1.00 = 2.00 Psg
Slot Pintu Tanam (Espanolate) 2.000 Bh 1.00 = 2.00 Bh
Engsel Pintu 3.000 Psg 1.00 = 3.00 Psg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 1.00 = 1.00 OH 1 hari = 1.00 Ls
Alat Bantu 1.000 Ls 1.00 = 1.00 OH 1 hari = 1.00 Ls

● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Pek. Pas. Kusen, Pintu PVC KM.WC 2.000 unit


Bahan : Koef. Volume Jumlah
Kusen dan Pintu PVC 1.000 unit 2.00 = 2.00 unit
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.400 oh 2.00 = 0.80 OH 1 hari = 0.80 oh
Tukang 1.200 oh 2.00 = 2.40 OH 1 hari = 2.40 oh
Kepala Tukang oh 2.00 = - OH 1 hari = - oh
Mandor oh 2.00 = - OH 1 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Pek. Pas. Kusen, Kaca & Asesoris tipe J 1 16.000 unit


Bahan : Koef. Volume Jumlah
Kusen Aluminium Natural 4" Jendela 11.520 M1 16.00 = 184.32 M1
Kaca Polos 5mm Jendela 2.040 M2 16.00 = 32.64 M2
Kusen Aluminium Natural 4" Bv 10.400 M1 16.00 = 166.40 M1
Kaca Polos 5mm Bv M2 16.00 = - M2
Asesoris Kusen Alumunium (35% dr bahan ) 1.000 Ls 16.00 = 16.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 16.00 = 16.00 OH 16 hari = 1.00 Ls
Alat Bantu 1.000 Ls 16.00 = 16.00 OH 16 hari = 1.00 Ls

● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Pek. Pas. Kusen, Kaca & Asesoris tipe J 2 4.000 unit


Bahan : Koef. Volume Jumlah
Kusen Aluminium Natural 4" Jendela 19.200 M1 4.00 = 76.80 M1
Kaca Polos 5mm Jendela 3.400 M2 4.00 = 13.60 M2
Kusen Aluminium Natural 4" Bv 16.600 M1 4.00 = 66.40 M1
Kaca Polos 5mm Bv M2 4.00 = - M2
Asesoris Kusen Alumunium (35% dr bahan ) 1.000 Ls 4.00 = 4.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 4.00 = 4.00 OH 4 hari = 1.00 Ls
Alat Bantu 1.000 Ls 4.00 = 4.00 OH 4 hari = 1.00 Ls

● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Pek. Pas. Kusen, Kaca & Asesoris tipe J 3 1.000 unit


Bahan : Koef. Volume Jumlah
Kusen Aluminium Natural 4" Jendela 16.800 M1 1.00 = 16.80 M1
Kaca Polos 5mm Jendela 4.830 M2 1.00 = 4.83 M2
Asesoris Kusen Alumunium (35% dr bahan ) 1.000 Ls 1.00 = 1.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 1.00 = 1.00 OH 4 hari = 0.25 Ls
Alat Bantu 1.000 Ls 1.00 = 1.00 OH 4 hari = 0.25 Ls

● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Pek. Pas. Kusen, Kaca & Asesoris tipe BV 3 2.000 unit


Bahan : Koef. Volume Jumlah
Kusen Aluminium Natural 4" Jendela 2.800 M1 2.00 = 5.60 M1
Kaca Polos 5mm Jendela 0.400 M2 2.00 = 0.80 M2
Asesoris Kusen Alumunium (35% dr bahan ) 1.000 Ls 2.00 = 2.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 2.00 = 2.00 OH 2 hari = 1.00 Ls
Alat Bantu 1.000 Ls 2.00 = 2.00 OH 2 hari = 1.00 Ls

● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Pek. Pas. RD 2 ( kios 1 ) 20.000 unit (TAHAP BERIKUTNYA)


Pek. Pas. RD 3 ( kios 2 ) 20.000 unit (TAHAP BERIKUTNYA)
Pek. Pas. RD 5 ( kios 3, 4, 5 ) 152.000 unit (TAHAP BERIKUTNYA)

PEKERJAAN SANITAIR

Pek. Pasang Kloset Jongkok sek. Toto 2 bh


Bahan : Koef. Volume Jumlah
Kloset jongkok porselen 1.000 Bh 2.00 = 2.00 Bh
Perlengkapan 35% dari harga bahan 1.000 ls 2.00 = 2.00 ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 3.300 oh 2.00 = 6.60 OH 2 hari = 3.30 oh
Tukang 1.100 oh 2.00 = 2.20 OH 2 hari = 1.10 oh
Kepala Tukang 0.001 oh 2.00 = 0.00 OH 2 hari = 0.00 oh
Mandor 0.160 oh 2.00 = 0.32 OH 2 hari = 0.16 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Pek. Pasang Kran 1/2" sek. Toto 2 bh


Bahan : Koef. Volume Jumlah
Kran air 1.000 Bh 2.00 = 2.00 Bh
Seal tape 1.000 ls 2.00 = 2.00 ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.010 oh 2.00 = 0.02 OH 2 hari = 0.01 oh
Tukang 0.100 oh 2.00 = 0.20 OH 2 hari = 0.10 oh
Kepala Tukang 0.010 oh 2.00 = 0.02 OH 2 hari = 0.01 oh
Mandor 0.005 oh 2.00 = 0.01 OH 2 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Pek. Pasang Floor Drain Sts sek. Toto 2 bh


Bahan : Koef. Volume Jumlah
Floor drain Sts 1.000 Bh 2.00 = 2.00 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.010 oh 2.00 = 0.02 OH 1 hari = 0.02 oh
Tukang 0.100 oh 2.00 = 0.20 OH 1 hari = 0.20 oh
Kepala Tukang 0.010 oh 2.00 = 0.02 OH 1 hari = 0.02 oh
Mandor 0.005 oh 2.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

PEKERJAAN LAIN-LAIN

Hand Rail Pipa 2" Finish Cat 40 m1


Bahan : Koef. Volume Jumlah
Besi Pipa 2" 2.720 kg 40.00 = 108.80 kg
Plat 10x10 mm 0.280 Kg 40.00 = 11.20 Kg
Asesoris 1.000 ls
Finishing Cat Besi 1.100 m2 40.00 = 44.00 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 40.00 = 40.00 OH 40 hari = 1.00 Ls

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 14

Pek. Railing Besi Hollow + Handrailing Pipa Besi Ø 2" Fin. Cat (Tangga Darurat ) 30 m1
Bahan : Koef. Volume Jumlah
Besi hollow 20x60x1,4 mm 1.920 kg 30.00 = 57.60 kg
Besi hollow 20x40x1,4 mm 4.800 Kg 30.00 = 144.00 Kg
Plat 10x10 mm 0.560 Kg 30.00 = 16.80 Kg
Handrail Pipa Besi Ø 2" 4.110 Kg 30.00 = 123.30 Kg
Finishing Cat Besi 1.100 m2 30.00 = 33.00 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang Pabrikasi Railling Tangga 1.000 Ls 30.00 = 30.00 OH 30 hari = 1.00 Ls

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 14

Pek. Urugan Pasir Urug Bawah Keramik t= 5cm 34.2 m3


Bahan : Koef. Volume Jumlah
Pasir Urug 1.200 M3 34.20 = 41.04 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.300 oh 34.20 = 10.26 OH 1 hari = 10.26 oh
Mandor 0.010 oh 34.20 = 0.34 OH 1 hari = 0.34 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 14

Pek. Allumunium Composite Dinding sek. Seven (TAHAP BERIKUTNYA)

PEKERJAAN ATAP SOLARFLAT (TAHAP BERIKUTNYA)

PEKERJAAN LANTAI 2

PEKERJAAN DINDING, PLESTERAN, ACIAN


Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 2760.36 m2
Bahan : Koef. Volume Jumlah
Bata merah 70 buah 2760.36 = 193,225.20 kg
Portland Cement 9.68 Kg 2760.36 = 26,720.28 ls
Pasir Pasang 0.045 m3 2760.36 = 124.22 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.300 OH 2760.36 = 828.11 OH 28 hari = 29.58 oh
Tukang batu 0.100 OH 2760.36 = 276.04 OH 28 hari = 9.86 oh
Kepala Tukang 0.010 OH 2760.36 = 27.60 OH 28 hari = 0.99 oh
Mandor 0.015 OH 2760.36 = 41.41 OH 28 hari = 1.48 oh

● Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 10

Pekerjaan plesteran dinding 1 : 5 5520.72 m2


Bahan : Koef. Volume Jumlah
Semen Portland 7.290 Kg 5520.72 = 40,246.05 Kg
Pasir Pasang 0.028 M3 5520.72 = 154.58 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 oh 5520.72 = 552.07 OH 28 hari = 19.72 oh
Tukang 0.120 oh 5520.72 = 662.49 OH 28 hari = 23.66 oh
Kepala Tukang 0.020 oh 5520.72 = 110.41 OH 28 hari = 3.94 oh
Mandor 0.013 oh 5520.72 = 69.01 OH 28 hari = 2.46 oh
● Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 11

Pekerjaan acian dinding sampai setinggi 3 m dr lantai 4364.4 m2


Bahan : Koef. Volume Jumlah
Semen Portland 4.000 Kg 4364.40 = 17,457.60 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.143 oh 4364.40 = 624.11 OH 28 hari = 22.29 oh
Tukang 0.107 oh 4364.40 = 466.99 OH 28 hari = 16.68 oh
Kepala Tukang 0.011 oh 4364.40 = 45.83 OH 28 hari = 1.64 oh
Mandor 0.010 oh 4364.40 = 43.64 OH 28 hari = 1.56 oh
● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 12

Pekerjaan Pas Ornamen Sirip Ikan 45 m2 (TAHAP BERIKUTNYA)

PEKERJAAN CAT

Pekerjaan Pengecatan Dinding Interior + Kolom Beton, sek. Vinilex 4018.8 m2


Bahan : Koef. Volume Jumlah
Cat dasar 0.200 Kg 4018.80 = 803.76 Kg
Cat penutup 2 x Vinilex 0.260 Kg 4018.80 = 1,044.89 Kg
Ampelas 0.100 Lbr 4018.80 = 401.88 Lbr
Roll Cat 0.025 Bh 4018.80 = 100.47 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.040 oh 4018.80 = 160.75 OH 14 hari = 11.48 oh
Tukang 0.080 oh 4018.80 = 321.50 OH 14 hari = 22.96 oh
Kepala Tukang 0.008 oh 4018.80 = 32.15 OH 14 hari = 2.30 oh
Mandor 0.005 oh 4018.80 = 20.09 OH 14 hari = 1.44 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 345.6 m2


Bahan : Koef. Volume Jumlah
Plamir 0.100 Kg 345.60 = 34.56 Kg
Cat dasar 0.100 Kg 345.60 = 34.56 Kg
Cat penutup 2 x 0.260 Kg 345.60 = 89.86 Kg
Ampelas 0.100 Lbr 345.60 = 34.56 Lbr
Roll Cat 0.025 Bh 345.60 = 8.64 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.040 oh 345.60 = 13.82 OH 14 hari = 0.99 oh
Tukang 0.080 oh 345.60 = 27.65 OH 14 hari = 1.97 oh
Kepala Tukang 0.008 oh 345.60 = 2.76 OH 14 hari = 0.20 oh
Mandor 0.005 oh 345.60 = 1.73 OH 14 hari = 0.12 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Pekerjaan Pengecatan Plafon gypsum 84 m2


Plamir 0.050 Kg 84.00 = 4.20 Kg
Cat dasar 0.100 Kg 84.00 = 8.40 Kg
Cat penutup 2 x 0.260 Kg 84.00 = 21.84 Kg
Ampelas 0.100 Lbr 84.00 = 8.40 Lbr
Roll Cat 0.025 Bh 84.00 = 2.10 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.040 oh 84.00 = 3.36 OH 14 hari = 0.24 oh
Tukang 0.080 oh 84.00 = 6.72 OH 14 hari = 0.48 oh
Kepala Tukang 0.008 oh 84.00 = 0.67 OH 14 hari = 0.05 oh
Mandor 0.005 oh 84.00 = 0.42 OH 14 hari = 0.03 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 15

Pek. Laburan Waterproofing Cementitious Lantai KM/WC, sek. Sika 5.78 m2


Bahan : Koef. Volume Jumlah
Waterproofimg Cementitious 0.500 Kg 5.78 = 2.89 Kg
Ampelas 0.500 lbr 5.78 = 2.89 lbr
Kwas 3" 0.010 bh 5.78 = 0.06 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.020 oh 5.78 = 0.12 OH 14 hari = 0.01 oh
Tukang 0.200 oh 5.78 = 1.16 OH 14 hari = 0.08 oh
Kepala Tukang 0.020 oh 5.78 = 0.12 OH 14 hari = 0.01 oh
Mandor 0.010 oh 5.78 = 0.06 OH 14 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 14

PEKERJAAN LANTAI
Pek. Keramik Lantai uk. 40x40 2230.24 m2
Bahan : Koef. Volume Jumlah
Keramik 40 x 40 cm 1.000 M2 2230.24 = 2,230.24 M2
Semen portland 11.380 Kg 2230.24 = 25,380.13 Kg
Pasir pasang 0.042 M3 2230.24 = 93.67 M3
Semen warna 1.500 Kg 2230.24 = 3,345.36 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.620 oh 2230.24 = 1,382.75 OH 28 hari = 49.38 oh
Tukang 0.350 oh 2230.24 = 780.58 OH 28 hari = 27.88 oh
Kepala Tukang 0.035 oh 2230.24 = 78.06 OH 28 hari = 2.79 oh
Mandor 0.030 oh 2230.24 = 66.91 OH 28 hari = 2.39 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 14

Pek. Keramik Lantai uk. 20x20 KM/WC 5.78 m2


Bahan : Koef. Volume Jumlah
Keramik 20 x 20 cm 1.000 M2 5.78 = 5.78 M2
Semen portland 11.380 Kg 5.78 = 65.78 Kg
Pasir pasang 0.042 M3 5.78 = 0.24 M3
Semen warna 1.500 Kg 5.78 = 8.67 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.620 oh 5.78 = 3.58 OH 1.00 hari = 3.58 oh
Tukang 0.350 oh 5.78 = 2.02 OH 1.00 hari = 2.02 oh
Kepala Tukang 0.035 oh 5.78 = 0.20 OH 1.00 hari = 0.20 oh
Mandor 0.030 oh 5.78 = 0.17 OH 1.00 hari = 0.17 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Pek. Keramik Dinding 20x25 KM/WC 39.6 m2


Bahan : Koef. Volume Jumlah
Keramik 20 x 25 cm 1.000 M2 39.60 = 39.60 M2
Semen portland 11.380 Kg 39.60 = 450.65 Kg
Pasir pasang 0.042 M3 39.60 = 1.66 M3
Semen warna 1.500 Kg 39.60 = 59.40 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.620 oh 39.60 = 24.55 OH 3 hari = 8.18 oh
Tukang 0.350 oh 39.60 = 13.86 OH 3 hari = 4.62 oh
Kepala Tukang 0.035 oh 39.60 = 1.39 OH 3 hari = 0.46 oh
Mandor 0.030 oh 39.60 = 1.19 OH 3 hari = 0.40 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Pek. Plin Keramik uk. 10x40 858 m1


Bahan : Koef. Volume Jumlah
Keramik 10 x 30 cm 0.100 M2 858.00 = 85.80 M2
Semen portland 1.650 Kg 858.00 = 1,415.70 Kg
Pasir pasang 0.003 M3 858.00 = 2.75 M3
Semen warna 0.100 Kg 858.00 = 85.80 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.062 oh 858.00 = 53.20 OH 7 hari = 7.60 oh
Tukang 0.035 oh 858.00 = 30.03 OH 7 hari = 4.29 oh
Kepala Tukang 0.004 oh 858.00 = 3.00 OH 7 hari = 0.43 oh
Mandor 0.003 oh 858.00 = 2.57 OH 7 hari = 0.37 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Pek. Keramik Dinding 20x20 Meja Beton sek. Mulia 149.52 m2


Bahan : Koef. Volume Jumlah
Keramik 20 x 25 cm 1.000 M2 149.52 = 149.52 M2
Semen portland 11.380 Kg 149.52 = 1,701.54 Kg
Pasir pasang 0.042 M3 149.52 = 6.28 M3
Semen warna 1.500 Kg 149.52 = 224.28 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.620 oh 149.52 = 92.70 OH 14 hari = 6.62 oh
Tukang 0.350 oh 149.52 = 52.33 OH 14 hari = 3.74 oh
Kepala Tukang 0.035 oh 149.52 = 5.23 OH 14 hari = 0.37 oh
Mandor 0.030 oh 149.52 = 4.49 OH 14 hari = 0.32 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 15

Pek. Keramik Dinding 20x20 Kios tipe 5 sek. Mulia 171.84 m2


Bahan : Koef. Volume Jumlah
Keramik 20 x 25 cm 1.000 M2 171.84 = 171.84 M2
Semen portland 11.380 Kg 171.84 = 1,955.54 Kg
Pasir pasang 0.042 M3 171.84 = 7.22 M3
Semen warna 1.500 Kg 171.84 = 257.76 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.620 oh 171.84 = 106.54 OH 14 hari = 7.61 oh
Tukang 0.350 oh 171.84 = 60.14 OH 14 hari = 4.30 oh
Kepala Tukang 0.035 oh 171.84 = 6.01 OH 14 hari = 0.43 oh
Mandor 0.030 oh 171.84 = 5.16 OH 14 hari = 0.37 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 15

PEKERJAAN PLAFOND

Pek. Rangka Plafon Hollow 84 m2


Bahan : Koef. Volume Jumlah
Besi Hollow 4 x 4 1.100 M' 84.00 = 92.40 M'
Gantungan Besi dia 6 0.275 Kg 84.00 = 23.10 Kg
Assesories dan Alat Bantu 1.000 ls 84.00 = 84.00 ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.020 oh 84.00 = 1.68 OH 1 hari = 1.68 oh
Tukang 0.100 oh 84.00 = 8.40 OH 1 hari = 8.40 oh
Kepala Tukang 0.020 oh 84.00 = 1.68 OH 1 hari = 1.68 oh
Mandor 0.002 oh 84.00 = 0.17 OH 1 hari = 0.17 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Pek. Plafon Gypsum t= 9 mm sek. Knauff 84 m2


Bahan : Koef. Volume Jumlah
Pelat Gypsum Board 0.364 Lbr 84.00 = 30.58 Lbr
Plaster Board 1.000 Ls 84.00 = 84.00 Ls
Paku Skrup 0.110 kg 84.00 = 9.24 kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.080 oh 84.00 = 6.72 OH 1 hari = 6.72 oh
Tukang 0.040 oh 84.00 = 3.36 OH 1 hari = 3.36 oh
Kepala Tukang 0.004 oh 84.00 = 0.34 OH 1 hari = 0.34 oh
Mandor 0.004 oh 84.00 = 0.34 OH 1 hari = 0.34 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

PEKERJAAN KUSEN, PINTU, JENDELA, BV

Pek. Pas. Kusen, Pintu & Asesoris tipe P1 1 unit


Bahan : Koef. Volume Jumlah
Kusen Aluminium Natural 4" 6.700 M' 1.00 = 6.70 M'
Asesoris Kusen Alumunium (35% dr bahan ) 1.000 ls 1.00 = 1.00 ls
Daun Pintu Double Teakwood tipe D2 1.000 Unit 1.00 = 1.00 Unit
Kunci Silinder dan Body untuk pintu 1.000 Bh 1.00 = 1.00 Bh
Handle Pintu Stainless Steel 2.000 Psg 1.00 = 2.00 Psg
Slot Pintu Tanam (Espanolate) 2.000 Bh 1.00 = 2.00 Bh
Engsel Pintu 3.000 Psg 1.00 = 3.00 Psg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 1.00 = 1.00 OH 1 hari = 1.00 Ls
Alat Bantu 1.000 Ls 1.00 = 1.00 OH 1 hari = 1.00 Ls

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Pek. Pas. Kusen, Pintu & Asesoris tipe P2 4 unit


Bahan : Koef. Volume Jumlah
Kusen Aluminium Natural 4" 4.420 M' 4.00 = 17.68 M'
Asesoris Kusen Alumunium (35% dr bahan ) 1.000 ls 4.00 = 4.00 ls
Daun Pintu Double Teakwood tipe D1 1.000 Unit 4.00 = 4.00 Unit
Kunci Silinder dan Body untuk pintu 1.000 Bh 4.00 = 4.00 Bh
Handle Pintu Stainless Steel 1.000 Psg 4.00 = 4.00 Psg
Kaca Polos Mati 5 mm 0.360 Bh 4.00 = 1.44 Bh
Engsel Pintu 2.000 Psg 4.00 = 8.00 Psg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 4.00 = 4.00 OH 4 hari = 1.00 Ls
Alat Bantu 1.000 Ls 4.00 = 4.00 OH 4 hari = 1.00 Ls

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Pek. Pas. Kusen, Pintu PVC KM.WC 2 unit


Bahan : Koef. Volume Jumlah
Kusen dan Pintu PVC 1.000 unit 2.00 = 2.00 unit
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.400 oh 2.00 = 0.80 OH 1 hari = 0.80 oh
Tukang 1.200 oh 2.00 = 2.40 OH 1 hari = 2.40 oh
Kepala Tukang oh 2.00 = - OH 1 hari = - oh
Mandor oh 2.00 = - OH 1 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12
Pek. Pas. Kusen, Kaca & Asesoris tipe J 1 6 unit
Bahan : Koef. Volume Jumlah
Kusen Aluminium Natural 4" Jendela 11.520 M1 6.00 = 69.12 M1
Kaca Polos 5mm Jendela 2.040 M2 6.00 = 12.24 M2
Kusen Aluminium Natural 4" Bv 10.400 M1 6.00 = 62.40 M1
Kaca Polos 5mm Bv M2 6.00 = - M2
Asesoris Kusen Alumunium (35% dr bahan ) 1.000 Ls 6.00 = 6.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 6.00 = 6.00 OH 16 hari = 0.38 Ls
Alat Bantu 1.000 Ls 6.00 = 6.00 OH 16 hari = 0.38 Ls

● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 12

Pek. Pas. Kusen, Kaca & Asesoris tipe J 2 4 unit


Bahan : Koef. Volume Jumlah
Kusen Aluminium Natural 4" Jendela 19.200 M1 4.00 = 76.80 M1
Kaca Polos 5mm Jendela 3.400 M2 4.00 = 13.60 M2
Kusen Aluminium Natural 4" Bv 16.600 M1 4.00 = 66.40 M1
Kaca Polos 5mm Bv M2 4.00 = - M2
Asesoris Kusen Alumunium (35% dr bahan ) 1.000 Ls 4.00 = 4.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 4.00 = 4.00 OH 4 hari = 1.00 Ls
Alat Bantu 1.000 Ls 4.00 = 4.00 OH 4 hari = 1.00 Ls

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Pek. Pas. Kusen, Kaca & Asesoris tipe J 3 1 unit


Bahan : Koef. Volume Jumlah
Kusen Aluminium Natural 4" Jendela 16.800 M1 1.00 = 16.80 M1
Kaca Polos 5mm Jendela 4.830 M2 1.00 = 4.83 M2
Asesoris Kusen Alumunium (35% dr bahan ) 1.000 Ls 1.00 = 1.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 1.00 = 1.00 OH 4 hari = 0.25 Ls
Alat Bantu 1.000 Ls 1.00 = 1.00 OH 4 hari = 0.25 Ls

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Pek. Pas. Kusen, Kaca & Asesoris tipe BV 3 2 unit


Bahan : Koef. Volume Jumlah
Kusen Aluminium Natural 4" Jendela 2.800 M1 2.00 = 5.60 M1
Kaca Polos 5mm Jendela 0.400 M2 2.00 = 0.80 M2
Asesoris Kusen Alumunium (35% dr bahan ) 1.000 Ls 2.00 = 2.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 2.00 = 2.00 OH 2 hari = 1.00 Ls
Alat Bantu 1.000 Ls 2.00 = 2.00 OH 2 hari = 1.00 Ls

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Pek. Pas. RD 2 ( kios 1 ) 0 unit VOLUME NOL

Pek. Pas. RD 3 ( kios 2 ) 52 unit (TAHAP BERIKUTNYA)

Pek. Pas. RD 5 ( kios 3, 4, 5 ) 143 unit (TAHAP BERIKUTNYA)

PEKERJAAN SANITAIR

Pek. Pasang Kloset Jongkok sek. Toto 2 bh


Bahan : Koef. Volume Jumlah
Kloset jongkok porselen 1.000 Bh 2.00 = 2.00 Bh
Perlengkapan 35% dari harga bahan 1.000 ls 2.00 = 2.00 ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 3.300 oh 2.00 = 6.60 OH 2 hari = 3.30 oh
Tukang 1.100 oh 2.00 = 2.20 OH 2 hari = 1.10 oh
Kepala Tukang 0.001 oh 2.00 = 0.00 OH 2 hari = 0.00 oh
Mandor 0.160 oh 2.00 = 0.32 OH 2 hari = 0.16 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16


Pek. Pasang Kran 1/2" sek. Toto 2 bh
Bahan : Koef. Volume Jumlah
Kran air 1.000 Bh 2.00 = 2.00 Bh
Seal tape 1.000 ls 2.00 = 2.00 ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.010 oh 2.00 = 0.02 OH 2 hari = 0.01 oh
Tukang 0.100 oh 2.00 = 0.20 OH 2 hari = 0.10 oh
Kepala Tukang 0.010 oh 2.00 = 0.02 OH 2 hari = 0.01 oh
Mandor 0.005 oh 2.00 = 0.01 OH 2 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Pek. Pasang Floor Drain Sts sek. Toto 2 bh


Bahan : Koef. Volume Jumlah
Floor drain Sts 1.000 Bh 2.00 = 2.00 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.010 oh 2.00 = 0.02 OH 1 hari = 0.02 oh
Tukang 0.100 oh 2.00 = 0.20 OH 1 hari = 0.20 oh
Kepala Tukang 0.010 oh 2.00 = 0.02 OH 1 hari = 0.02 oh
Mandor 0.005 oh 2.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

PEKERJAAN LAIN-LAIN

Pek. Railing Besi Hollow + Handrailing Pipa Besi Ø 2" Fin. Cat (Tangga Darurat ) 30 m1
Bahan : Koef. Volume Jumlah
Besi hollow 20x60x1,4 mm 1.920 kg 30.00 = 57.60 kg
Besi hollow 20x40x1,4 mm 4.800 Kg 30.00 = 144.00 Kg
Plat 10x10 mm 0.560 Kg 30.00 = 16.80 Kg
Handrail Pipa Besi Ø 2" 4.110 Kg 30.00 = 123.30 Kg
Finishing Cat Besi 1.100 m2 30.00 = 33.00 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang Pabrikasi Railling Tangga 1.000 Ls 30.00 = 30.00 OH 30 hari = 1.00 Ls

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 17

Pek. Urugan Pasir Urug Bawah Keramik t= 5cm 34.2 m3


Bahan : Koef. Volume Jumlah
Pasir Urug 1.200 M3 34.20 = 41.04 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.300 oh 34.20 = 10.26 OH 1 hari = 10.26 oh
Mandor 0.010 oh 34.20 = 0.34 OH 1 hari = 0.34 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 17

PEKERJAAN LANTAI DAK BETON

PEKERJAAN DINDING, PLESTERAN, ACIAN

Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 384 m2


Bahan : Koef. Volume Jumlah
Bata merah 70 buah 384.00 = 26,880.00 kg
Portland Cement 9.68 Kg 384.00 = 3,717.12 ls
Pasir Pasang 0.045 m3 384.00 = 17.28 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.300 OH 384.00 = 115.20 OH 28 hari = 4.11 oh
Tukang batu 0.100 OH 384.00 = 38.40 OH 28 hari = 1.37 oh
Kepala Tukang 0.010 OH 384.00 = 3.84 OH 28 hari = 0.14 oh
Mandor 0.015 OH 384.00 = 5.76 OH 28 hari = 0.21 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Pekerjaan plesteran dinding 1 : 5 768 m2


Bahan : Koef. Volume Jumlah
Semen Portland 7.290 Kg 768.00 = 5,598.72 Kg
Pasir Pasang 0.028 M3 768.00 = 21.50 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 oh 768.00 = 76.80 OH 14 hari = 5.49 oh
Tukang 0.120 oh 768.00 = 92.16 OH 14 hari = 6.58 oh
Kepala Tukang 0.020 oh 768.00 = 15.36 OH 14 hari = 1.10 oh
Mandor 0.013 oh 768.00 = 9.60 OH 14 hari = 0.69 oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 13

Pekerjaan acian dinding 768 m2


Bahan : Koef. Volume Jumlah
Semen Portland 4.000 Kg 768.00 = 3,072.00 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.143 oh 768.00 = 109.82 OH 14 hari = 7.84 oh
Tukang 0.107 oh 768.00 = 82.18 OH 14 hari = 5.87 oh
Kepala Tukang 0.011 oh 768.00 = 8.06 OH 14 hari = 0.58 oh
Mandor 0.010 oh 768.00 = 7.68 OH 14 hari = 0.55 oh
● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 14

PEKERJAAN CAT, PELAPIS DINDING

Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 768 m2


Bahan : Koef. Volume Jumlah
Plamir 0.100 Kg 768.00 = 76.80 Kg
Cat dasar 0.100 Kg 768.00 = 76.80 Kg
Cat penutup 2 x 0.260 Kg 768.00 = 199.68 Kg
Ampelas 0.100 Lbr 768.00 = 76.80 Lbr
Roll Cat 0.025 Bh 768.00 = 19.20 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.040 oh 768.00 = 30.72 OH 14 hari = 2.19 oh
Tukang 0.080 oh 768.00 = 61.44 OH 14 hari = 4.39 oh
Kepala Tukang 0.008 oh 768.00 = 6.14 OH 14 hari = 0.44 oh
Mandor 0.005 oh 768.00 = 3.84 OH 14 hari = 0.27 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 15

Pek. Laburan Waterproofing Cementitious Dak Beton, sek. Sika 225 m2


Bahan : Koef. Volume Jumlah
Waterproofimg Cementitious 0.500 Kg 225.00 = 112.50 Kg
Ampelas 0.500 lbr 225.00 = 112.50 lbr
Kwas 3" 0.010 bh 225.00 = 2.25 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.020 oh 225.00 = 4.50 OH 14 hari = 0.32 oh
Tukang 0.200 oh 225.00 = 45.00 OH 14 hari = 3.21 oh
Kepala Tukang 0.020 oh 225.00 = 4.50 OH 14 hari = 0.32 oh
Mandor 0.010 oh 225.00 = 2.25 OH 14 hari = 0.16 oh
● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 16

Pek. Allumunium Composite Dinding sek. Seven 207.00 m2 (TAHAP BERIKUTNYA)

Pek Pas Kaca Tbl 5 mm 64.00 m2 (TAHAP BERIKUTNYA)

PEKERJAAN LAIN-LAIN

Pek. Screeding t= 7cm K-175 75.35 m3


Bahan : Koef. Volume Jumlah
Portland Cement 210.000 Kg 75.35 = 15,823.50 Kg
Pasir Beton 0.300 m3 75.35 = 22.61 m3
KR maks. 30 mm 0.500 m3 75.35 = 37.68 m3
Air 215.000 Liter 75.35 = 16,200.25 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 1.650 OH 75.35 = 124.33 OH 14 hari = 8.88 oh
Tukang 0.275 OH 75.35 = 20.72 OH 14 hari = 1.48 oh
Kepala tukang 0.028 OH 75.35 = 2.11 OH 14 hari = 0.15 oh
Mandor 0.083 OH 75.35 = 6.25 OH 14 hari = 0.45 oh
● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 16

Pek. Pas. Huruf 3D Plat t= 0,8mm finishing Duco uk. 80x65x6 cm bertuliskan : 10 bh
Bahan : Koef. Volume Jumlah
Huruf Plat Eisser t=0,8mm uk. 40x20x4 cm 80.000 cm 10.00 = 800.00 cm
Cat Duco 0.640 m2 10.00 = 6.40 m2
Besi hollow 20x60x1,4 mm 2.080 kg 10.00 = 20.80 kg
Besi hollow 20x40x1,4 mm 3.570 Kg 10.00 = 35.70 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 10.00 = 10.00 Ls 10 hari = 1.00 oh
Alat Bantu 1.000 Ls 10.00 = 10.00 Ls 10 hari = 1.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16
PASAR LELES

Pek. Pas. Huruf 3D Plat t= 1,8 m finishing Duco bertuliskan : GARUT 5 bh


Bahan : Koef. Volume Jumlah
Huruf Plat Eisser t=1,8 m 180.000 cm 5.00 = 900.00 cm
Cat Duco 0.640 m2 5.00 = 3.20 m2
Besi hollow 20x60x1,4 mm 2.080 kg 5.00 = 10.40 kg
Besi hollow 20x40x1,4 mm 3.570 Kg 5.00 = 17.85 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 5.00 = 5.00 Ls 10 hari = 0.50 oh
Alat Bantu 1.000 Ls 5.00 = 5.00 Ls 10 hari = 0.50 oh
● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Pek Pas Ornamen Batik Cnc Plat Tbl 2 mm + finishing Cat Besi 58.28 m2 (TAHAP BERIKUTNYA)

Pek. Pas. Roofdrain Sts Ø 3" 32 bh


Bahan : Koef. Volume Jumlah
Roof drain Sts Ø 3" 1.000 BH 32.00 = 32.00 BH
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.010 OH 32.00 = 0.32 OH 1 hari = 0.32 oh
Tukang 0.100 OH 32.00 = 3.20 OH 1 hari = 3.20 oh
Kepala tukang 0.010 OH 32.00 = 0.32 OH 1 hari = 0.32 oh
Mandor 0.005 OH 32.00 = 0.16 OH 1 hari = 0.16 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

II . BANGUNAN SAMPING
A PEKERJAAN STRUKTUR DAN ATAP

I PEKERJAAN PERSIAPAN

II PEKERJAAN GALIAN TANAH & URUGAN

III PEKERJAAN PONDASI

IV PEKERJAAN BETON LANTAI DASAR

Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 7.26 m3
Beton Mutu K-250 7.26 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 7.26 = 7.26
Alat bantu 1.000 m3 7.26 = 7.26
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 8

Besi Beton 4Ø10mm 906.039 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 906.04 = 951.34 Kg
kawat beton 0.015 m3 906.04 = 13.59 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 906.04 = 6.34 OH 7 hari = 0.91 oh
Tukang 0.007 OH 906.04 = 6.34 OH 7 hari = 0.91 oh
Kepala tukang 0.007 OH 906.04 = 6.34 OH 7 hari = 0.91 oh
Mandor 0.000 OH 906.04 = 0.27 OH 7 hari = 0.04 oh
● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

Besi Beton Cincin Ø20mm-(100 s/d 200)mm 179.626 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 179.63 = 188.61 Kg
kawat beton 0.015 m3 179.63 = 2.69 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 179.63 = 1.26 OH 3 hari = 0.42 oh
Tukang 0.007 OH 179.63 = 1.26 OH 3 hari = 0.42 oh
Kepala tukang 0.007 OH 179.63 = 1.26 OH 3 hari = 0.42 oh
Mandor 0.000 OH 179.63 = 0.05 OH 3 hari = 0.02 oh
● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

Bekisting kolom 64.593 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 1.050 Kg 64.59 = 67.82 Kg
Paku 5 cm-12cm 0.015 m3 64.59 = 0.97 m3
Balok kayu kelas lII 0.007 m3 64.59 = 0.45 m3
Plywood Tebal 9mm
Stoowerk kayu kelas lII 0.007 Liter 16.29 = 0.11 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.660 OH 64.59 = 42.63 OH 8 hari = 5.33 oh
Tukang 0.330 OH 64.59 = 21.32 OH 8 hari = 2.66 oh
Kepala tukang 0.033 OH 64.59 = 2.13 OH 8 hari = 0.27 oh
Mandor 0.033 OH 64.59 = 2.13 OH 8 hari = 0.27 oh
● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 7

V PEKERJAAN BETON LANTAI 1

Pek. Beton Kolom Praktis 15/15, dan balok lintei 15/15 K-250 9.45 m3
Beton Mutu K-250 9.45 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 9.45 = 9.45
Alat bantu 1.000 m3 9.45 = 9.45
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 8

Besi Beton 4Ø10mm 1,179.738 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 1179.74 = 1,238.72 Kg
kawat beton 0.015 m3 1179.74 = 17.70 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 1179.74 = 8.26 OH 7 hari = 1.18 oh
Tukang 0.007 OH 1179.74 = 8.26 OH 7 hari = 1.18 oh
Kepala tukang 0.007 OH 1179.74 = 8.26 OH 7 hari = 1.18 oh
Mandor 0.000 OH 1179.74 = 0.35 OH 7 hari = 0.05 oh
● Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 7

Besi Beton Cincin Ø20mm-(100 s/d 200)mm 233.888 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 233.89 = 245.58 Kg
kawat beton 0.015 m3 233.89 = 3.51 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 233.89 = 1.64 OH 3 hari = 0.55 oh
Tukang 0.007 OH 233.89 = 1.64 OH 3 hari = 0.55 oh
Kepala tukang 0.007 OH 233.89 = 1.64 OH 3 hari = 0.55 oh
Mandor 0.000 OH 233.89 = 0.07 OH 3 hari = 0.02 oh
● Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 7

Bekisting kolom 84.105 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 1.050 Kg 84.11 = 88.31 Kg
Paku 5 cm-12cm 0.015 m3 84.11 = 1.26 m3
Balok kayu kelas lII 0.007 m3 84.11 = 0.59 m3
Plywood Tebal 9mm
Stoowerk kayu kelas lII 0.007 Liter 16.29 = 0.11 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.660 OH 84.11 = 55.51 OH 9 hari = 6.17 oh
Tukang 0.330 OH 84.11 = 27.75 OH 9 hari = 3.08 oh
Kepala tukang 0.033 OH 84.11 = 2.78 OH 9 hari = 0.31 oh
Mandor 0.033 OH 84.11 = 2.78 OH 9 hari = 0.31 oh
● Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 7

Pek. Pemasangan Karet Dilatasi 12 m1


Bahan : Koef. Volume Jumlah
Karet Dilatasi 1.020 M 12.00 = 12.24 M
Alat bantu 1.000 Ls 12.00 = 12.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.025 oh 12.00 = 0.30 OH 1 hari = 0.30 oh
Tukang 0.025 oh 12.00 = 0.30 OH 1 hari = 2.44 oh
Kepala Tukang 0.002 oh 12.00 = 0.02 OH 1 hari = 0.24 oh
Mandor 0.001 oh 12.00 = 0.01 OH 1 hari = 0.24 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Pek. Beton Plat Tangga + Bordes dan Perbaikan Bekisting existing 2.44 m³
Beton Mutu K-250 2.440 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 2.44 = 2.44
Alat bantu 1.000 m3 2.44 = 2.44
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 8

Besi Beton Bawah Melintang Ø12MM-150 mm 163.175 Kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 163.18 = 163.18
kawat beton 1.000 Kg 163.18 = 163.18
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 163.18 = 1.14 OH 4 hari = 0.29 oh
Tukang 0.007 OH 163.18 = 1.14 OH 4 hari = 0.29 oh
Kepala tukang 0.007 OH 163.18 = 1.14 OH 4 hari = 0.29 oh
Mandor 0.000 OH 163.18 = 0.05 OH 4 hari = 0.01 oh

Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 7

Besi Beton Bawah Memanjang Ø12MM-150 mm 144.005 Kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 144.00 = 144.00
kawat beton 1.000 Kg 144.00 = 144.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 144.00 = 1.01 OH 4 hari = 0.25 oh
Tukang 0.007 OH 144.00 = 1.01 OH 4 hari = 0.25 oh
Kepala tukang 0.007 OH 144.00 = 1.01 OH 4 hari = 0.25 oh
Mandor 0.000 OH 144.00 = 0.04 OH 4 hari = 0.01 oh
Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 7

Besi Beton Atas Melintang Ø10MM-150 mm 112.850 Kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 112.85 = 112.85
kawat beton 1.000 Kg 112.85 = 112.85
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 112.85 = 0.79 OH 4 hari = 0.20 oh
Tukang 0.007 OH 112.85 = 0.79 OH 4 hari = 0.20 oh
Kepala tukang 0.007 OH 112.85 = 0.79 OH 4 hari = 0.20 oh
Mandor 0.000 OH 112.85 = 0.03 OH 4 hari = 0.01 oh
Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 7

Besi Beton Step melintang Ø8MM-150 mm 3.855 Kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 3.86 = 3.86
kawat beton 1.000 Kg 3.86 = 3.86
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 3.86 = 0.03 OH 4 hari = 0.01 oh
Tukang 0.007 OH 3.86 = 0.03 OH 4 hari = 0.01 oh
Kepala tukang 0.007 OH 3.86 = 0.03 OH 4 hari = 0.01 oh
Mandor 0.000 OH 3.86 = 0.00 OH 4 hari = 0.00 oh
Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 7

Besi Beton Step memanjang Ø8MM-150 mm 9.638 Kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 9.64 = 9.64
kawat beton 1.000 Kg 9.64 = 9.64
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 9.64 = 0.07 OH 4 hari = 0.02 oh
Tukang 0.007 OH 9.64 = 0.07 OH 4 hari = 0.02 oh
Kepala tukang 0.007 OH 9.64 = 0.07 OH 4 hari = 0.02 oh
Mandor 0.000 OH 9.64 = 0.00 OH 4 hari = 0.00 oh
Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 7

Bekisting Step Tangga 20.333 M2


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 20.33 = 20.33
kawat beton 1.000 Kg 20.33 = 20.33
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 20.33 = 0.14 OH 4 hari = 0.04 oh
Tukang 0.007 OH 20.33 = 0.14 OH 4 hari = 0.04 oh
Kepala tukang 0.007 OH 20.33 = 0.14 OH 4 hari = 0.04 oh
Mandor 0.000 OH 20.33 = 0.01 OH 4 hari = 0.00 oh
Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 7

Bekisting Plat Tangga 24.400 M2


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 24.40 = 24.40
kawat beton 1.000 Kg 24.40 = 24.40
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 24.40 = 0.17 OH 4 hari = 0.04 oh
Tukang 0.007 OH 24.40 = 0.17 OH 4 hari = 0.04 oh
Kepala tukang 0.007 OH 24.40 = 0.17 OH 4 hari = 0.04 oh
Mandor 0.000 OH 24.40 = 0.01 OH 4 hari = 0.00 oh
Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 7

Pek. Beton Plat Tangga + Bordes, K-250 dan Perbaikan Bekisting existing 1 unit
Beton Mutu K-250 1.000 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 1.00 = 1.00
Alat bantu 1.000 m3 1.00 = 1.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

Besi Beton Bawah Melintang Ø12MM-150 mm 66.875 Kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 66.88 = 66.88
kawat beton 1.000 Kg 66.88 = 66.88
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 66.88 = 0.47 OH 4 hari = 0.12 oh
Tukang 0.007 OH 66.88 = 0.47 OH 4 hari = 0.12 oh
Kepala tukang 0.007 OH 66.88 = 0.47 OH 4 hari = 0.12 oh
Mandor 0.000 OH 66.88 = 0.02 OH 4 hari = 0.01 oh

Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 8

Besi Beton Bawah Memanjang Ø12MM-150 mm 59.018 Kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 59.02 = 59.02
kawat beton 1.000 Kg 59.02 = 59.02
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 59.02 = 0.41 OH 4 hari = 0.10 oh
Tukang 0.007 OH 59.02 = 0.41 OH 4 hari = 0.10 oh
Kepala tukang 0.007 OH 59.02 = 0.41 OH 4 hari = 0.10 oh
Mandor 0.000 OH 59.02 = 0.02 OH 4 hari = 0.00 oh
Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 8

Besi Beton Atas Melintang Ø10MM-150 mm 46.250 Kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 46.25 = 46.25
kawat beton 1.000 Kg 46.25 = 46.25
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 46.25 = 0.32 OH 4 hari = 0.08 oh
Tukang 0.007 OH 46.25 = 0.32 OH 4 hari = 0.08 oh
Kepala tukang 0.007 OH 46.25 = 0.32 OH 4 hari = 0.08 oh
Mandor 0.000 OH 46.25 = 0.01 OH 4 hari = 0.00 oh
Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 8
Besi Beton Step melintang Ø8MM-150 mm 1.580 Kg
Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 1.58 = 1.58
kawat beton 1.000 Kg 1.58 = 1.58
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 1.58 = 0.01 OH 4 hari = 0.00 oh
Tukang 0.007 OH 1.58 = 0.01 OH 4 hari = 0.00 oh
Kepala tukang 0.007 OH 1.58 = 0.01 OH 4 hari = 0.00 oh
Mandor 0.000 OH 1.58 = 0.00 OH 4 hari = 0.00 oh
Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 8

Besi Beton Step memanjang Ø8MM-150 mm 3.950 Kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 3.95 = 3.95
kawat beton 1.000 Kg 3.95 = 3.95
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 3.95 = 0.03 OH 4 hari = 0.01 oh
Tukang 0.007 OH 3.95 = 0.03 OH 4 hari = 0.01 oh
Kepala tukang 0.007 OH 3.95 = 0.03 OH 4 hari = 0.01 oh
Mandor 0.000 OH 3.95 = 0.00 OH 4 hari = 0.00 oh
Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 8

Bekisting Step Tangga 8.333 M2


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 8.33 = 8.33
kawat beton 1.000 Kg 8.33 = 8.33
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 8.33 = 0.06 OH 4 hari = 0.01 oh
Tukang 0.007 OH 8.33 = 0.06 OH 4 hari = 0.01 oh
Kepala tukang 0.007 OH 8.33 = 0.06 OH 4 hari = 0.01 oh
Mandor 0.000 OH 8.33 = 0.00 OH 4 hari = 0.00 oh
Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 8

Bekisting Plat Tangga 10.000 M2


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.000 Kg 10.00 = 10.00
kawat beton 1.000 Kg 10.00 = 10.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 10.00 = 0.07 OH 4 hari = 0.02 oh
Tukang 0.007 OH 10.00 = 0.07 OH 4 hari = 0.02 oh
Kepala tukang 0.007 OH 10.00 = 0.07 OH 4 hari = 0.02 oh
Mandor 0.000 OH 10.00 = 0.00 OH 4 hari = 0.00 oh
Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 8

VI PEKERJAAN BETON LANTAI 2

Pek. Beton Kolom Praktis 15/15, K-175 0.9 m3


Beton Mutu K-250 0.90 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 0.90 = 0.90
Alat bantu 1.000 m3 0.90 = 0.90
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton 4Ø10mm 112.356 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 112.36 = 117.97 Kg
kawat beton 0.015 m3 112.36 = 1.69 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 112.36 = 0.79 OH 7 hari = 0.11 oh
Tukang 0.007 OH 112.36 = 0.79 OH 7 hari = 0.11 oh
Kepala tukang 0.007 OH 112.36 = 0.79 OH 7 hari = 0.11 oh
Mandor 0.000 OH 112.36 = 0.03 OH 7 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Besi Beton Cincin Ø20mm-(100 s/d 200)mm 22.275 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 22.28 = 23.39 Kg
kawat beton 0.015 m3 22.28 = 0.33 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 22.28 = 0.16 OH 3 hari = 0.05 oh
Tukang 0.007 OH 22.28 = 0.16 OH 3 hari = 0.05 oh
Kepala tukang 0.007 OH 22.28 = 0.16 OH 3 hari = 0.05 oh
Mandor 0.000 OH 22.28 = 0.01 OH 3 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

Bekisting kolom 8.010 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 1.050 Kg 8.01 = 8.41 Kg
Paku 5 cm-12cm 0.015 m3 8.01 = 0.12 m3
Balok kayu kelas lII 0.007 m3 8.01 = 0.06 m3
Plywood Tebal 9mm
Stoowerk kayu kelas lII 0.007 Liter 16.29 = 0.11 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.660 OH 8.01 = 5.29 OH 9 hari = 0.59 oh
Tukang 0.330 OH 8.01 = 2.64 OH 9 hari = 0.29 oh
Kepala tukang 0.033 OH 8.01 = 0.26 OH 9 hari = 0.03 oh
Mandor 0.033 OH 8.01 = 0.26 OH 9 hari = 0.03 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Cor Beton Kolom Struktur K1 45/45, K-300 dan Perbaikan Bekisting existing 15.39 m3
Beton Mutu K-300 1.00 m3
Beton Mutu K-300 1.00 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 1.00 = 1.00
Alat bantu 1.000 m3 1.00 = 1.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton 16D16mm 124.84 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 124.84 = 131.08 Kg
kawat beton 0.015 m3 124.84 = 1.87 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 124.84 = 0.87 OH 7 hari = 0.12 oh
Tukang 0.007 OH 124.84 = 0.87 OH 7 hari = 0.12 oh
Kepala tukang 0.007 OH 124.84 = 0.87 OH 7 hari = 0.12 oh
Mandor 0.000 OH 124.84 = 0.04 OH 7 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Besi Beton Cincin D13mm-(100)mm 24.75 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 24.75 = 25.99 Kg
kawat beton 0.015 m3 24.75 = 0.37 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 24.75 = 0.17 OH 7 hari = 0.02 oh
Tukang 0.007 OH 24.75 = 0.17 OH 7 hari = 0.02 oh
Kepala tukang 0.007 OH 24.75 = 0.17 OH 7 hari = 0.02 oh
Mandor 0.000 OH 24.75 = 0.01 OH 7 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Bekisting kolom 9.78 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 1.050 Kg 9.78 = 10.27 Kg
Paku 5 cm-12cm 0.015 m3 9.78 = 0.15 m3
Balok kayu kelas lII 0.007 m3 9.78 = 0.07 m3
Plywood Tebal 9mm
Stoowerk kayu kelas lII 0.007 Liter 16.29 = 0.11 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.660 OH 9.78 = 6.45 OH 9 hari = 0.72 oh
Tukang 0.330 OH 9.78 = 3.23 OH 9 hari = 0.36 oh
Kepala tukang 0.033 OH 9.78 = 0.32 OH 9 hari = 0.04 oh
Mandor 0.033 OH 9.78 = 0.32 OH 9 hari = 0.04 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11
Cor Beton Kolom Struktur K2 35/45, K-300 dan Perbaikan Bekisting existing 5.1 m³
Beton Mutu K-300 1.00 m3
Beton Mutu K-300 1.00 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 1.00 = 1.00
Alat bantu 1.000 m3 1.00 = 1.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 1 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton 16D16mm 124.84 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 124.84 = 131.08 Kg
kawat beton 0.015 m3 124.84 = 1.87 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 124.84 = 0.87 OH 7 hari = 0.12 oh
Tukang 0.007 OH 124.84 = 0.87 OH 7 hari = 0.12 oh
Kepala tukang 0.007 OH 124.84 = 0.87 OH 7 hari = 0.12 oh
Mandor 0.000 OH 124.84 = 0.04 OH 7 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Besi Beton Cincin D13mm-(100)mm 24.75 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 24.75 = 25.99 Kg
kawat beton 0.015 m3 24.75 = 0.37 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 24.75 = 0.17 OH 7 hari = 0.02 oh
Tukang 0.007 OH 24.75 = 0.17 OH 7 hari = 0.02 oh
Kepala tukang 0.007 OH 24.75 = 0.17 OH 7 hari = 0.02 oh
Mandor 0.000 OH 24.75 = 0.01 OH 7 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Bekisting kolom 9.78 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 1.050 Kg 9.78 = 10.27 Kg
Paku 5 cm-12cm 0.015 m3 9.78 = 0.15 m3
Balok kayu kelas lII 0.007 m3 9.78 = 0.07 m3
Plywood Tebal 9mm
Stoowerk kayu kelas lII 0.007 Liter 16.29 = 0.11 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.660 OH 9.78 = 6.45 OH 9 hari = 0.72 oh
Tukang 0.330 OH 9.78 = 3.23 OH 9 hari = 0.36 oh
Kepala tukang 0.033 OH 9.78 = 0.32 OH 9 hari = 0.04 oh
Mandor 0.033 OH 9.78 = 0.32 OH 9 hari = 0.04 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 11

Cor Beton Balok Struktur B1a 30/60, K-250 Bekisting existing 15.2 m³
Beton Mutu K - 250 15.200 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 15.20 = 15.20
Alat bantu 1.000 m3 15.20 = 15.20
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Besi Beton 12D16mm 734.890 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 734.89 = 771.63 Kg
kawat beton 0.015 m3 734.89 = 11.02 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 734.89 = 5.14 OH 7 hari = 0.73 oh
Tukang 0.007 OH 734.89 = 5.14 OH 7 hari = 0.73 oh
Kepala tukang 0.007 OH 734.89 = 5.14 OH 7 hari = 0.73 oh
Mandor 0.000 OH 734.89 = 0.22 OH 7 hari = 0.03 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton 2D16mm 266.578 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 266.58 = 279.91 Kg
kawat beton 0.015 m3 266.58 = 4.00 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 266.58 = 1.87 OH 7 hari = 0.27 oh
Tukang 0.007 OH 266.58 = 1.87 OH 7 hari = 0.27 oh
Kepala tukang 0.007 OH 266.58 = 1.87 OH 7 hari = 0.27 oh
Mandor 0.000 OH 266.58 = 0.08 OH 7 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton Cincin D13mm-(125-250 )mm 238.306 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 238.31 = 250.22 Kg
kawat beton 0.015 m3 238.31 = 3.57 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 238.31 = 1.67 OH 3 hari = 0.56 oh
Tukang 0.007 OH 238.31 = 1.67 OH 3 hari = 0.56 oh
Kepala tukang 0.007 OH 238.31 = 1.67 OH 3 hari = 0.56 oh
Mandor 0.000 OH 238.31 = 0.07 OH 3 hari = 0.02 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Bekisting Balok 126.540 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.034 m3 126.54 = 4.30 Kg
Paku 5 cm-12cm 0.400 kg 126.54 = 50.62 Kg
Balok kayu kelas lII 0.010 m3 126.54 = 1.27 Kg
Plywood Tebal 9mm 0.350 Lbr 126.54 = 44.29 Kg
Perancah kayu kelas lII 0.056 m3 126.54 = 7.09 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.660 OH 126.54 = 83.52 OH 28 hari = 2.98 oh
Tukang 0.330 OH 126.54 = 41.76 OH 28 hari = 1.49 oh
Kepala tukang 0.033 OH 126.54 = 4.18 OH 28 hari = 0.15 oh
Mandor 0.033 OH 126.54 = 4.18 OH 28 hari = 0.15 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Cor Beton Balok Struktur B1b 30/60 , K-250 Bekisting existing 11.2 m³
Beton Mutu K - 250 11.200 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 11.20 = 11.20
Alat bantu 1.000 m3 11.20 = 11.20
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Besi Beton 12D16mm 541.498 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 541.50 = 568.57 Kg
kawat beton 0.015 m3 541.50 = 8.12 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 541.50 = 3.79 OH 7 hari = 0.54 oh
Tukang 0.007 OH 541.50 = 3.79 OH 7 hari = 0.54 oh
Kepala tukang 0.007 OH 541.50 = 3.79 OH 7 hari = 0.54 oh
Mandor 0.000 OH 541.50 = 0.16 OH 7 hari = 0.02 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton 2D16mm 196.426 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 196.43 = 206.25 Kg
kawat beton 0.015 m3 196.43 = 2.95 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 196.43 = 1.37 OH 7 hari = 0.20 oh
Tukang 0.007 OH 196.43 = 1.37 OH 7 hari = 0.20 oh
Kepala tukang 0.007 OH 196.43 = 1.37 OH 7 hari = 0.20 oh
Mandor 0.000 OH 196.43 = 0.06 OH 7 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton Cincin D13mm-(125-250 )mm 175.594 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 175.59 = 184.37 Kg
kawat beton 0.015 m3 175.59 = 2.63 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 175.59 = 1.23 OH 3 hari = 0.41 oh
Tukang 0.007 OH 175.59 = 1.23 OH 3 hari = 0.41 oh
Kepala tukang 0.007 OH 175.59 = 1.23 OH 3 hari = 0.41 oh
Mandor 0.000 OH 175.59 = 0.05 OH 3 hari = 0.02 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Bekisting Balok 93.240 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.034 m3 93.24 = 3.17 Kg
Paku 5 cm-12cm 0.400 kg 93.24 = 37.30 Kg
Balok kayu kelas lII 0.010 m3 93.24 = 0.93 Kg
Plywood Tebal 9mm 0.350 Lbr 93.24 = 32.63 Kg
Perancah kayu kelas lII 0.056 m3 93.24 = 5.22 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.660 OH 93.24 = 61.54 OH 28 hari = 2.20 oh
Tukang 0.330 OH 93.24 = 30.77 OH 28 hari = 1.10 oh
Kepala tukang 0.033 OH 93.24 = 3.08 OH 28 hari = 0.11 oh
Mandor 0.033 OH 93.24 = 3.08 OH 28 hari = 0.11 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Cor Beton Balok Struktur B1a 30/60 , K-250 Bekisting existing 0.79 m³
Beton Mutu K - 250 0.790 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 0.79 = 0.79
Alat bantu 1.000 m3 0.79 = 0.79
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Besi Beton 12D16mm 38.195 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 38.19 = 40.10 Kg
kawat beton 0.015 m3 38.19 = 0.57 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 38.19 = 0.27 OH 7 hari = 0.04 oh
Tukang 0.007 OH 38.19 = 0.27 OH 7 hari = 0.04 oh
Kepala tukang 0.007 OH 38.19 = 0.27 OH 7 hari = 0.04 oh
Mandor 0.000 OH 38.19 = 0.01 OH 7 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton 2D16mm 13.855 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 13.86 = 14.55 Kg
kawat beton 0.015 m3 13.86 = 0.21 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 13.86 = 0.10 OH 7 hari = 0.01 oh
Tukang 0.007 OH 13.86 = 0.10 OH 7 hari = 0.01 oh
Kepala tukang 0.007 OH 13.86 = 0.10 OH 7 hari = 0.01 oh
Mandor 0.000 OH 13.86 = 0.00 OH 7 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton Cincin D13mm-(125-250 )mm 12.386 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 12.39 = 13.00 Kg
kawat beton 0.015 m3 12.39 = 0.19 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 12.39 = 0.09 OH 3 hari = 0.03 oh
Tukang 0.007 OH 12.39 = 0.09 OH 3 hari = 0.03 oh
Kepala tukang 0.007 OH 12.39 = 0.09 OH 3 hari = 0.03 oh
Mandor 0.000 OH 12.39 = 0.00 OH 3 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Bekisting Balok 6.577 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.034 m3 6.58 = 0.22 Kg
Paku 5 cm-12cm 0.400 kg 6.58 = 2.63 Kg
Balok kayu kelas lII 0.010 m3 6.58 = 0.07 Kg
Plywood Tebal 9mm 0.350 Lbr 6.58 = 2.30 Kg
Perancah kayu kelas lII 0.056 m3 6.58 = 0.37 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.660 OH 6.58 = 4.34 OH 14 hari = 0.31 oh
Tukang 0.330 OH 6.58 = 2.17 OH 14 hari = 0.16 oh
Kepala tukang 0.033 OH 6.58 = 0.22 OH 14 hari = 0.02 oh
Mandor 0.033 OH 6.58 = 0.22 OH 14 hari = 0.02 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 12

Cor Beton Balok Struktur B2 25/45, K-250 Bekisting existing 5.83 m³


Beton Mutu K - 250 5.830 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 5.83 = 5.83
Alat bantu 1.000 m3 5.83 = 5.83
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Besi Beton 12D16mm 281.869 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 281.87 = 295.96 Kg
kawat beton 0.015 m3 281.87 = 4.23 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 281.87 = 1.97 OH 7 hari = 0.28 oh
Tukang 0.007 OH 281.87 = 1.97 OH 7 hari = 0.28 oh
Kepala tukang 0.007 OH 281.87 = 1.97 OH 7 hari = 0.28 oh
Mandor 0.000 OH 281.87 = 0.08 OH 7 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton 2D16mm 102.247 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 102.25 = 107.36 Kg
kawat beton 0.015 m3 102.25 = 1.53 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 102.25 = 0.72 OH 7 hari = 0.10 oh
Tukang 0.007 OH 102.25 = 0.72 OH 7 hari = 0.10 oh
Kepala tukang 0.007 OH 102.25 = 0.72 OH 7 hari = 0.10 oh
Mandor 0.000 OH 102.25 = 0.03 OH 7 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton Cincin D13mm-(125-250 )mm 91.403 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 91.40 = 95.97 Kg
kawat beton 0.015 m3 91.40 = 1.37 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 91.40 = 0.64 OH 3 hari = 0.21 oh
Tukang 0.007 OH 91.40 = 0.64 OH 3 hari = 0.21 oh
Kepala tukang 0.007 OH 91.40 = 0.64 OH 3 hari = 0.21 oh
Mandor 0.000 OH 91.40 = 0.03 OH 3 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Bekisting Balok 48.535 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.034 m3 48.53 = 1.65 Kg
Paku 5 cm-12cm 0.400 kg 48.53 = 19.41 Kg
Balok kayu kelas lII 0.010 m3 48.53 = 0.49 Kg
Plywood Tebal 9mm 0.350 Lbr 48.53 = 16.99 Kg
Perancah kayu kelas lII 0.056 m3 48.53 = 2.72 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.660 OH 48.53 = 32.03 OH 28 hari = 1.14 oh
Tukang 0.330 OH 48.53 = 16.02 OH 28 hari = 0.57 oh
Kepala tukang 0.033 OH 48.53 = 1.60 OH 28 hari = 0.06 oh
Mandor 0.033 OH 48.53 = 1.60 OH 28 hari = 0.06 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Cor Beton Balok Struktur B3 25/45, K-250 Bekisting existing 1.02 m³


Beton Mutu K - 250 1.020 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 1.02 = 1.02
Alat bantu 1.000 m3 1.02 = 1.02
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Besi Beton 12D16mm 49.315 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 49.31 = 51.78 Kg
kawat beton 0.015 m3 49.31 = 0.74 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 49.31 = 0.35 OH 7 hari = 0.05 oh
Tukang 0.007 OH 49.31 = 0.35 OH 7 hari = 0.05 oh
Kepala tukang 0.007 OH 49.31 = 0.35 OH 7 hari = 0.05 oh
Mandor 0.000 OH 49.31 = 0.01 OH 7 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton 2D16mm 17.889 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 17.89 = 18.78 Kg
kawat beton 0.015 m3 17.89 = 0.27 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 17.89 = 0.13 OH 7 hari = 0.02 oh
Tukang 0.007 OH 17.89 = 0.13 OH 7 hari = 0.02 oh
Kepala tukang 0.007 OH 17.89 = 0.13 OH 7 hari = 0.02 oh
Mandor 0.000 OH 17.89 = 0.01 OH 7 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Besi Beton Cincin D13mm-(125-250 )mm 15.992 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 15.99 = 16.79 Kg
kawat beton 0.015 m3 15.99 = 0.24 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 15.99 = 0.11 OH 3 hari = 0.04 oh
Tukang 0.007 OH 15.99 = 0.11 OH 3 hari = 0.04 oh
Kepala tukang 0.007 OH 15.99 = 0.11 OH 3 hari = 0.04 oh
Mandor 0.000 OH 15.99 = 0.00 OH 3 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Bekisting Balok 8.492 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.034 m3 8.49 = 0.29 Kg
Paku 5 cm-12cm 0.400 kg 8.49 = 3.40 Kg
Balok kayu kelas lII 0.010 m3 8.49 = 0.08 Kg
Plywood Tebal 9mm 0.350 Lbr 8.49 = 2.97 Kg
Perancah kayu kelas lII 0.056 m3 8.49 = 0.48 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.660 OH 8.49 = 5.60 OH 14 hari = 0.40 oh
Tukang 0.330 OH 8.49 = 2.80 OH 14 hari = 0.20 oh
Kepala tukang 0.033 OH 8.49 = 0.28 OH 14 hari = 0.02 oh
Mandor 0.033 OH 8.49 = 0.28 OH 14 hari = 0.02 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Cor Beton Plat Lantai t= 12 cm, K-250 Bekisting existing 53.13 m³


Beton Mutu K-250 53.130 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 53.13 = 53.13 m3
Alat bantu 1.000 m3 53.13 = 53.13 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS 53.13 53.13 LS 1 hari = 1.00 LS
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Besi Beton Tul.melintang 2x Ø 10 mm-150 mm 2,116.699 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 53.13 = 55.79 Kg
kawat beton 0.015 Kg 53.13 = 0.80 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 53.13 = 0.37 OH 1 hari = 0.37 oh
Tukang 0.007 OH 53.13 = 0.37 OH 1 hari = 0.37 oh
Kepala tukang 0.007 OH 53.13 = 0.37 OH 1 hari = 0.37 oh
Mandor 0.000 OH 53.13 = 0.02 OH 1 hari = 0.02 oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Besi Beton Tul.memanjang 2x Ø10 mm-150 mm 2,116.699 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 53.13 = 55.79 Kg
kawat beton 0.015 Kg 53.13 = 0.80 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 53.13 = 0.37 OH 1 hari = 0.37 oh
Tukang 0.007 OH 53.13 = 0.37 OH 1 hari = 0.37 oh
Kepala tukang 0.007 OH 53.13 = 0.37 OH 1 hari = 0.37 oh
Mandor 0.000 OH 53.13 = 0.02 OH 1 hari = 0.02 oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Bekisting Lantai 443.928 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.030 M3 53.13 = 1.59 M3
Paku 5 cm- 10 cm 0.300 Kg 53.13 = 15.94 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.520 OH 53.13 = 27.63 OH 7 hari = 3.95 oh
Tukang 0.260 OH 53.13 = 13.81 OH 7 hari = 1.97 oh
Kepala tukang 0.026 OH 53.13 = 1.38 OH 7 hari = 0.20 oh
Mandor 0.026 OH 53.13 = 1.38 OH 7 hari = 0.20 oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Pek Beton Tangga Split Level 1.00 UNIT


Bahan : Koef. Volume Jumlah
TANGGA SPLIT 1.000 UNIT 1.00 = 1.00 UNIT
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
JASA PASANG 1.000 LS 1.00 = 1.00 OH 1 hari = 1.00 LS
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

VII PEKERJAAN BETON DAK ATAP

Pek. Beton Balok Struktur B1b 30/60 , K-250 36.98 m3


Beton Mutu K - 250 36.980 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 36.98 = 36.98
Alat bantu 1.000 m3 36.98 = 36.98
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Besi Beton 12D16mm 1,787.909 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 1787.91 = 1,877.30 Kg
kawat beton 0.015 m3 1787.91 = 26.82 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 1787.91 = 12.52 OH 7 hari = 1.79 oh
Tukang 0.007 OH 1787.91 = 12.52 OH 7 hari = 1.79 oh
Kepala tukang 0.007 OH 1787.91 = 12.52 OH 7 hari = 1.79 oh
Mandor 0.000 OH 1787.91 = 0.54 OH 7 hari = 0.08 oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 13

Besi Beton 2D16mm 648.555 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 648.56 = 680.98 Kg
kawat beton 0.015 m3 648.56 = 9.73 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 648.56 = 4.54 OH 7 hari = 0.65 oh
Tukang 0.007 OH 648.56 = 4.54 OH 7 hari = 0.65 oh
Kepala tukang 0.007 OH 648.56 = 4.54 OH 7 hari = 0.65 oh
Mandor 0.000 OH 648.56 = 0.19 OH 7 hari = 0.03 oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 13
Besi Beton Cincin D13mm-(125-250 )mm 579.772 kg
Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 579.77 = 608.76 Kg
kawat beton 0.015 m3 579.77 = 8.70 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 579.77 = 4.06 OH 3 hari = 1.35 oh
Tukang 0.007 OH 579.77 = 4.06 OH 3 hari = 1.35 oh
Kepala tukang 0.007 OH 579.77 = 4.06 OH 3 hari = 1.35 oh
Mandor 0.000 OH 579.77 = 0.17 OH 3 hari = 0.06 oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 13

Bekisting Balok 307.859 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.034 m3 307.86 = 10.47 Kg
Paku 5 cm-12cm 0.400 kg 307.86 = 123.14 Kg
Balok kayu kelas lII 0.010 m3 307.86 = 3.08 Kg
Plywood Tebal 9mm 0.350 Lbr 307.86 = 107.75 Kg
Perancah kayu kelas lII 0.056 m3 307.86 = 17.24 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.660 OH 307.86 = 203.19 OH 28 hari = 7.26 oh
Tukang 0.330 OH 307.86 = 101.59 OH 28 hari = 3.63 oh
Kepala tukang 0.033 OH 307.86 = 10.16 OH 28 hari = 0.36 oh
Mandor 0.033 OH 307.86 = 10.16 OH 28 hari = 0.36 oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 13

VIII PEKERJAAN RANGKA BAJA, ATAP DAN PENUTUP ATAP

Pek. Kolom Baja WF 200.100.5.6 127.98 kg


Bahan : Volume Jumlah
Besi baja IWF 1.15 Kg 127.98 = 147.18 Kg
Kawat las listrik 0.04 kg 127.98 = 5.12 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.04 OH 127.98 = 5.12 OH 1 hari = 5.12 oh
Tukang las konstruksi 0.04 OH 127.98 = 5.12 OH 1 hari = 2.44 oh
Kepala Tukang 0.004 OH 127.98 = 0.51 OH 1 hari = 0.24 oh
Mandor 0.002 OH 127.98 = 0.26 OH 1 hari = 0.24 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 14

Pek. Kuda-kuda Baja WF 200.100.5.6 895.86 kg


Bahan : Volume Jumlah
Besi baja IWF 1.15 Kg 895.86 = 1,030.24 Kg
Kawat las listrik 0.04 kg 895.86 = 35.83 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.04 OH 895.86 = 35.83 OH 7 hari = 5.12 oh
Tukang las konstruksi 0.04 OH 895.86 = 35.83 OH 7 hari = 2.44 oh
Kepala Tukang 0.004 OH 895.86 = 3.58 OH 7 hari = 0.24 oh
Mandor 0.002 OH 895.86 = 1.79 OH 7 hari = 0.24 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 14

Pek. Voute WF 200.100.5.6 95.99 kg


Bahan : Volume Jumlah
Besi baja IWF 1.15 Kg 95.99 = 110.39 Kg
Kawat las listrik 0.04 kg 95.99 = 3.84 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.04 OH 95.99 = 3.84 OH 1 hari = 3.84 oh
Tukang las konstruksi 0.04 OH 95.99 = 3.84 OH 1 hari = 2.44 oh
Kepala Tukang 0.004 OH 95.99 = 0.38 OH 1 hari = 0.24 oh
Mandor 0.002 OH 95.99 = 0.19 OH 1 hari = 0.24 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Pek. Gording CNP 100.50.20.2,3 795.76 kg


Bahan : Volume Jumlah
Besi profil 1.15 Kg 795.76 = 915.12 Kg
Kawat las listrik 0.04 kg 795.76 = 31.83 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.04 OH 795.76 = 31.83 OH 1 hari = 31.83 oh
Tukang las konstruksi 0.04 OH 795.76 = 31.83 OH 1 hari = 2.44 oh
Kepala Tukang 0.004 OH 795.76 = 3.18 OH 1 hari = 0.24 oh
Mandor 0.002 OH 795.76 = 1.59 OH 1 hari = 0.24 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Pek Besi L 70.70.7 Dudukan Gording 59.41 kg


Bahan : Volume Jumlah
Besi profil 1.15 Kg 59.41 = 68.32 Kg
Kawat las listrik 0.04 kg 59.41 = 2.38 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.04 OH 59.41 = 2.38 OH 1 hari = 2.38 oh
Tukang las konstruksi 0.04 OH 59.41 = 2.38 OH 1 hari = 2.44 oh
Kepala Tukang 0.004 OH 59.41 = 0.24 OH 1 hari = 0.24 oh
Mandor 0.002 OH 59.41 = 0.12 OH 1 hari = 0.24 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Pek Besi Plat Stifner t = 0,8 mm 112.32 kg


Bahan : Volume Jumlah
Besi Plat Baja tebal 2 mm - 16 mm 1.005 Kg 112.32 = 112.88 Kg
Kawat las 0.05 kg 112.32 = 5.62 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.06 OH 112.32 = 6.74 OH 1 hari = 6.74 oh
Tukang las konstruksi 0.06 OH 112.32 = 6.74 OH 1 hari = 2.44 oh
Kepala Tukang 0.006 OH 112.32 = 0.67 OH 1 hari = 0.24 oh
Mandor 0.006 OH 112.32 = 0.67 OH 1 hari = 0.24 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Pek. Besi Trekstang Ø 12 mm 166.61 kg


Bahan : Volume Jumlah
Besi Beton Polos 1.005 Kg 166.61 = 167.44 Kg
Kawat las 0.05 kg 166.61 = 8.33 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.06 OH 166.61 = 10.00 OH 3 hari = 3.33 oh
Tukang las konstruksi 0.06 OH 166.61 = 10.00 OH 3 hari = 2.44 oh
Kepala Tukang 0.006 OH 166.61 = 1.00 OH 3 hari = 0.24 oh
Mandor 0.006 OH 166.61 = 1.00 OH 3 hari = 0.24 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 15

Pek. Ikatan Angin Kuda kuda / Besi Ø 12 mm 178 kg


Bahan : Volume Jumlah
Besi Beton Polos 1.005 Kg 178.00 = 178.89 Kg
Kawat las 0.05 kg 178.00 = 8.90 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.06 OH 178.00 = 10.68 OH 1 hari = 10.68 oh
Tukang las konstruksi 0.06 OH 178.00 = 10.68 OH 1 hari = 2.44 oh
Kepala Tukang 0.006 OH 178.00 = 1.07 OH 1 hari = 0.24 oh
Mandor 0.006 OH 178.00 = 1.07 OH 1 hari = 0.24 oh

● Rencana Waktu Pelaksanaan : Minggu ke 5 s/d minggu ke 15

Pek. Angker Baud + Mur HTB Ø 18 mm 48 bh


Bahan : Volume Jumlah
Besi Plat Baja tebal 2 mm - 16 mm 1.005 Kg 48.00 = 48.24 Kg
Kawat las 0.05 kg 48.00 = 2.40 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.06 OH 48.00 = 2.88 OH 1 hari = 2.88 oh
Tukang las konstruksi 0.06 OH 48.00 = 2.88 OH 1 hari = 2.44 oh
Kepala Tukang 0.006 OH 48.00 = 0.29 OH 1 hari = 0.24 oh
Mandor 0.006 OH 48.00 = 0.29 OH 1 hari = 0.24 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13


Pek. Base Plat t = 1,8 mm 82.6 kg
Bahan : Volume Jumlah
Angker Baud 1 Kg 82.60 = 82.60 Kg
Kawat las Listrik 0.04 kg 82.60 = 3.30 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.04 OH 82.60 = 3.30 OH 1 hari = 3.30 oh
Tukang las konstruksi 0.04 OH 82.60 = 3.30 OH 1 hari = 2.44 oh
Kepala Tukang 0.004 OH 82.60 = 0.33 OH 1 hari = 0.24 oh
Mandor 0.002 OH 82.60 = 0.17 OH 1 hari = 0.24 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Pek. Beton Pedestal 40/40 K-250 0.26 m3


Beton Mutu K-250 1.000 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 1.00 = 1.00
Alat bantu 1.000 m3 1.00 = 1.00
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Besi Beton 6Ø12mm-(150)mm 53.040 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 53.04 = 55.69 Kg
kawat beton 0.015 m3 53.04 = 0.80 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 53.04 = 0.37 OH 3 hari = 0.12 oh
Tukang 0.007 OH 53.04 = 0.37 OH 3 hari = 0.12 oh
Kepala tukang 0.007 OH 53.04 = 0.37 OH 3 hari = 0.12 oh
Mandor 0.000 OH 53.04 = 0.02 OH 3 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Besi Beton Cincin Ø8mm-(150) mm 34.660 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 34.66 = 36.39 Kg
kawat beton 0.015 m3 34.66 = 0.52 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 34.66 = 0.24 OH 1 hari = 0.24 oh
Tukang 0.007 OH 34.66 = 0.24 OH 1 hari = 0.24 oh
Kepala tukang 0.007 OH 34.66 = 0.24 OH 1 hari = 0.24 oh
Mandor 0.000 OH 34.66 = 0.01 OH 1 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Bekisting Pondasi 10.000 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.030 M3 10.00 = 0.30 Kg
Paku 5 cm- 10 cm 0.300 Kg 10.00 = 3.00 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.520 OH 10.00 = 5.20 OH 1 hari = 5.20 oh
Tukang 0.260 OH 10.00 = 2.60 OH 1 hari = 2.60 oh
Kepala tukang 0.026 OH 10.00 = 0.26 OH 1 hari = 0.26 oh
Mandor 0.026 OH 10.00 = 0.26 OH 1 hari = 0.26 oh
● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Pek. Penutup Atap Bitumaen (Reff Produk Onduline) 485.39 m2


Bahan : Koef. Volume Jumlah
Atap Bitumen Bergelombang Monolayer 3 mm 0.650 Lbr 485.39 = 315.50 Kg
Paku atau Sekrup 9.100 bh 485.39 = 4,417.05 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.140 OH 485.39 = 67.95 OH 7 hari = 9.71 oh
Tukang 0.070 OH 485.39 = 33.98 OH 7 hari = 4.85 oh
Kepala tukang 0.007 OH 485.39 = 3.40 OH 7 hari = 0.49 oh
Mandor 0.007 OH 485.39 = 3.40 OH 7 hari = 0.49 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Pek. Pasang Nok Bitumen ( reff Produk Onduline ) 14 m'


Bahan : Koef. Volume Jumlah
Nok 1.000 Lbr 14.00 = 14.00 Kg
assesoris 1.000 bh 14.00 = 14.00 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja - OH 14.00 = - OH 2 hari = - oh
Tukang 0.200 OH 14.00 = 2.80 OH 2 hari = 1.40 oh
Kepala tukang - OH 14.00 = - OH 2 hari = - oh
Mandor - OH 14.00 = - OH 2 hari = - oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

B PEKERJAAN ARSITEKTUR

I PEKERJAAN LANTAI Dasar (TAHAP BERIKUTNYA)

II PEKERJAAN LANTAI 1

PEKERJAAN DINDING, PLESTERAN, ACIAN

Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 1089 m2


Bahan : Koef. Volume Jumlah
Bata merah 70 buah 1089.00 = 76,230.00 kg
Portland Cement 9.68 Kg 1089.00 = 10,541.52 ls
Pasir Pasang 0.045 m3 1089.00 = 49.01 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.300 OH 1089.00 = 326.70 OH 28 hari = 11.67 oh
Tukang batu 0.100 OH 1089.00 = 108.90 OH 28 hari = 3.89 oh
Kepala Tukang 0.010 OH 1089.00 = 10.89 OH 28 hari = 0.39 oh
Mandor 0.015 OH 1089.00 = 16.34 OH 28 hari = 0.58 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 11

Pekerjaan plesteran dinding 1 : 5 2178 m2


Bahan : Koef. Volume Jumlah
Semen Portland 7.290 Kg 2178.00 = 15,877.62 Kg
Pasir Pasang 0.028 M3 2178.00 = 60.98 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 oh 2178.00 = 217.80 OH 28 hari = 7.78 oh
Tukang 0.120 oh 2178.00 = 261.36 OH 28 hari = 9.33 oh
Kepala Tukang 0.020 oh 2178.00 = 43.56 OH 28 hari = 1.56 oh
Mandor 0.013 oh 2178.00 = 27.23 OH 28 hari = 0.97 oh
● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 12

Pekerjaan acian dinding sampai setinggi 3 m dr lantai 1452 m2


Bahan : Koef. Volume Jumlah
Semen Portland 4.000 Kg 1452.00 = 5,808.00 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.143 oh 1452.00 = 207.64 OH 28 hari = 7.42 oh
Tukang 0.107 oh 1452.00 = 155.36 OH 28 hari = 5.55 oh
Kepala Tukang 0.011 oh 1452.00 = 15.25 OH 28 hari = 0.54 oh
Mandor 0.010 oh 1452.00 = 14.52 OH 28 hari = 0.52 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 13

PEKERJAAN CAT

Pekerjaan Pengecatan Dinding Interior + Kolom Beton, sek. Vinilex 1065 m2


Bahan : Koef. Volume Jumlah
Cat dasar 0.200 Kg 1065.00 = 213.00 Kg
Cat penutup 2 x Vinilex 0.260 Kg 1065.00 = 276.90 Kg
Ampelas 0.100 Lbr 1065.00 = 106.50 Lbr
Roll Cat 0.025 Bh 1065.00 = 26.63 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.040 oh 1065.00 = 42.60 OH 14 hari = 3.04 oh
Tukang 0.080 oh 1065.00 = 85.20 OH 14 hari = 6.09 oh
Kepala Tukang 0.008 oh 1065.00 = 8.52 OH 14 hari = 0.61 oh
Mandor 0.005 oh 1065.00 = 5.33 OH 14 hari = 0.38 oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 13

Pekerjaan pengecatan Dinding Exterior, sek. Vinilex 387 m2


Bahan : Koef. Volume Jumlah
Plamir 0.100 Kg 387.00 = 38.70 Kg
Cat dasar 0.100 Kg 387.00 = 38.70 Kg
Cat penutup 2 x 0.260 Kg 387.00 = 100.62 Kg
Ampelas 0.100 Lbr 387.00 = 38.70 Lbr
Roll Cat 0.025 Bh 387.00 = 9.68 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.040 oh 387.00 = 15.48 OH 14 hari = 1.11 oh
Tukang 0.080 oh 387.00 = 30.96 OH 14 hari = 2.21 oh
Kepala Tukang 0.008 oh 387.00 = 3.10 OH 14 hari = 0.22 oh
Mandor 0.005 oh 387.00 = 1.94 OH 14 hari = 0.14 oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 13

Pekerjaan Pengecatan Plafon Beton + Balok Ekspose, sek. Vinilex 528.32 m2


Bahan : Koef. Volume Jumlah
Plamir 0.050 Kg 528.32 = 26.42 Kg
Cat dasar 0.100 Kg 528.32 = 52.83 Kg
Cat penutup 2 x 0.260 Kg 528.32 = 137.36 Kg
Ampelas 0.100 Lbr 528.32 = 52.83 Lbr
Roll Cat 0.025 Bh 528.32 = 13.21 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.040 oh 528.32 = 21.13 OH 14 hari = 1.51 oh
Tukang 0.080 oh 528.32 = 42.27 OH 14 hari = 3.02 oh
Kepala Tukang 0.008 oh 528.32 = 4.23 OH 14 hari = 0.30 oh
Mandor 0.005 oh 528.32 = 2.64 OH 14 hari = 0.19 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

PEKERJAAN LANTAI

Pek. Keramik Lantai uk. 40x40 528.32 m2


Bahan : Koef. Volume Jumlah
Keramik 40 x 40 cm 1.000 M2 528.32 = 528.32 M2
Semen portland 11.380 Kg 528.32 = 6,012.28 Kg
Pasir pasang 0.042 M3 528.32 = 22.19 M3
Semen warna 1.500 Kg 528.32 = 792.48 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.620 oh 528.32 = 327.56 OH 21 hari = 15.60 oh
Tukang 0.350 oh 528.32 = 184.91 OH 21 hari = 8.81 oh
Kepala Tukang 0.035 oh 528.32 = 18.49 OH 21 hari = 0.88 oh
Mandor 0.030 oh 528.32 = 15.85 OH 21 hari = 0.75 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 14

Pek. Plin Keramik uk. 10x40 398 m1


Bahan : Koef. Volume Jumlah
Keramik 10 x 30 cm 0.100 M2 398.00 = 39.80 M2
Semen portland 1.650 Kg 398.00 = 656.70 Kg
Pasir pasang 0.003 M3 398.00 = 1.27 M3
Semen warna 0.100 Kg 398.00 = 39.80 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.062 oh 398.00 = 24.68 OH 3 hari = 8.23 oh
Tukang 0.035 oh 398.00 = 13.93 OH 3 hari = 4.64 oh
Kepala Tukang 0.004 oh 398.00 = 1.39 OH 3 hari = 0.46 oh
Mandor 0.003 oh 398.00 = 1.19 OH 3 hari = 0.40 oh
● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 17

PEKERJAAN PLAFOND

PEKERJAAN KUSEN, PINTU, JENDELA, BV

Pek. Pas. Kusen & Pintu Allumunium Spanrel tipe P1 1 unit


Bahan : Koef. Volume Jumlah
Kusen dan Pintu Spanrel 1.000 unit 1.00 = 1.00 unit
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.062 oh 1.00 = 0.06 OH 1 hari = 0.06 oh
Tukang 0.035 oh 1.00 = 0.04 OH 1 hari = 0.04 oh
Kepala Tukang 0.004 oh 1.00 = 0.00 OH 1 hari = 0.00 oh
Mandor 0.003 oh 1.00 = 0.00 OH 1 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14
Pek. Pas. Kusen, Jendela & Asesoris tipe J1 22 unit
Bahan : Koef. Volume Jumlah
Kusen Aluminium Natural 4" Jendela 4.000 M1 22.00 = 88.00 M1
Kaca Polos 5mm Jendela 0.863 M2 22.00 = 18.98 M2
Asesoris Kusen Alumunium (35% dr bahan ) 1.000 Ls 22.00 = 22.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 22.00 = 22.00 OH 22 hari = 1.00 oh
Alat Bantu 1.000 Ls 22.00 = 22.00 OH 22 hari = 1.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 14

Pek. Pas. Kusen, Kaca & Asesoris tipe BV 2 1 unit


Bahan : Koef. Volume Jumlah
Kusen Aluminium Natural 4" Jendela 9.400 M1 1.00 = 9.40 M1
Kaca Polos 5mm Jendela 1.680 M2 1.00 = 1.68 M2
Asesoris Kusen Alumunium (35% dr bahan ) 1.000 Ls 1.00 = 1.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 1.00 = 1.00 OH 22 hari = 0.05 oh
Alat Bantu 1.000 Ls 1.00 = 1.00 OH 22 hari = 0.05 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 14

Pek. Pas. RD 2 ( kios 1 ) 9.00 unit (Tahap berikutnya)

Pek. Pas. RD 3 ( kios 2 ) 12.00 unit (Tahap berikutnya)

Pek. Pas. RD 5 ( kios 3 ) 20.00 unit (Tahap berikutnya)

PEKERJAAN LAIN-LAIN

Hand Rail Pipa 2" Finish Cat 40 m1


Bahan : Koef. Volume Jumlah
Besi Pipa 2" 2.720 kg 40.00 = 108.80 kg
Plat 10x10 mm 0.280 Kg 40.00 = 11.20 Kg
Asesoris 1.000 ls
Finishing Cat Besi 1.100 m2 40.00 = 44.00 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1.000 Ls 40.00 = 40.00 OH 40 hari = 1.00 Ls

● Rencana Waktu Pelaksanaan : Minggu ke 18 s/d minggu ke 18

Pek. Urugan Pasir Urug Bawah Keramik t= 10cm 52.83 m3


Bahan : Koef. Volume Jumlah
Pasir Urug 1.200 M3 52.83 = 63.40 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.300 oh 52.83 = 15.85 OH 5 hari = 3.17 oh
Mandor 0.010 oh 52.83 = 0.53 OH 5 hari = 0.11 oh

● Rencana Waktu Pelaksanaan : Minggu ke 18 s/d minggu ke 18

III PEKERJAAN LANTAI 2 (TAHAP BERIKUTNYA)

IV PEKERJAAN LANTAI DAK BETON (TAHAP BERIKUTNYA)

III. SITE
III PEKERJAAN SITE
A PEKERJAAN STRUKTUR DAN ARSITEKTUR

PEKERJAAN JALAN

Beton Rigid t= 15 cm, K 250 190.73 m3


Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 190.73 = 190.73

1.000
Alat bantu m3 190.73 = 190.73
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 14
Lantai Kerja t=5 cm, K 175 63.58 m3
Bahan : Koef. Volume Jumlah
Portland Cement 210.000 Kg 63.58 = 13,351.80 Kg
Pasir Beton 0.300 m3 63.58 = 19.07 m3
KR maks. 30 mm 0.500 m3 63.58 = 31.79 m3
Air 215.000 Liter 63.58 = 13,669.70 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 1.650 oh 63.58 = 104.91 OH 3 hari = 34.97 oh
Tukang 0.275 oh 63.58 = 17.48 OH 3 hari = 5.83 oh
Kepala Tukang 0.028 oh 63.58 = 1.78 OH 3 hari = 0.59 oh
Mandor 0.083 oh 63.58 = 5.28 OH 3 hari = 1.76 oh
● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Urugan Pasir urug dipadatkan t=10cm 127.16 m3


Bahan : Koef. Volume Jumlah
Pasir Urug 1.200 M3 127.16 = 152.59 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.300 oh 127.16 = 38.15 OH 5 hari = 7.63 oh
Mandor 0.010 oh 127.16 = 1.27 OH 5 hari = 0.25 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Paving blok Tbl 8 cm 260 m2


Bahan : Koef. Volume Jumlah
Paving Block 8 cm 1.010 M2 260.00 = 262.60 M2
Pasir Beton 0.100 m3 260.00 = 26.00 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 oh 260.00 = 65.00 OH 14 hari = 4.64 oh
Tukang 0.500 oh 260.00 = 130.00 OH 14 hari = 9.29 oh
Kepala Tukang 0.025 oh 260.00 = 6.50 OH 14 hari = 0.46 oh
Mandor 0.003 oh 260.00 = 0.78 OH 14 hari = 0.06 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 15

Kanstein Paving Blok 280 m1


Galian Tanah 70.00 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Tukang gali 0.750 oh 70.00 = 52.50 OH 1 hari = 52.50 oh
Mandor 0.025 oh 70.00 = 1.75 OH 1 hari = 1.75 oh
● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Buangan tanah 70.00 m3


Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.516 oh 70.00 = 36.12 OH 7 hari = 5.16 oh
Mandor 0.050 oh 70.00 = 3.50 OH 7 hari = 0.50 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Kansteen 280.00 m'


Bahan : Koef. Volume Jumlah
Kansteen 1.000 bh 280.00 = 280.00 bh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Adukan Speci. 1 : 3 42.00 m2


Bahan : Volume Jumlah
Semen Portland 10.8 Kg 42.00 = 453.60 Kg
Pasir Pasang 0.026 kg 42.00 = 1.09 kg
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.1 OH 42.00 = 4.20 OH 1 hari = 4.20 oh
Tukang las konstruksi 0.12 OH 42.00 = 5.04 OH 1 hari = 5.04 oh
Kepala Tukang 0.02 OH 42.00 = 0.84 OH 1 hari = 0.84 oh
Mandor 0.0125 OH 42.00 = 0.53 OH 1 hari = 0.53 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Urugan Pasir Urug Drop Zone Di padatkan 18 m3


Bahan : Koef. Volume Jumlah
Batu belah 15 cm/20 cm 1.2 M³ 18.00 = 21.60 m3
Portland Cement 202 Kg 18.00 = 3,636.00 Kg
Pasir Pasang 0.485 M³ 18.00 = 8.73 m3
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 1.5 OH 18.00 = 27.00 OH 7 hari = 3.86 oh
Tukang las konstruksi 0.6 OH 18.00 = 10.80 OH 7 hari = 1.54 oh
Kepala Tukang 0.06 OH 18.00 = 1.08 OH 7 hari = 0.15 oh
Mandor 0.075 OH 18.00 = 1.35 OH 7 hari = 0.19 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Pasangan Batu Drope Zone 77 m3


Bahan : Koef. Volume Jumlah
Batu belah 15 cm/20 cm 1.2 M³ 77.00 = 92.40 m3
Portland Cement 202 Kg 92.40 = 18,664.80 Kg
Pasir Pasang 0.485 M³ 18664.80 = 9,052.43 m3
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 1.5 OH 77.00 = 115.50 OH 14 hari = 8.25 oh
Tukang las konstruksi 0.6 OH 77.00 = 46.20 OH 14 hari = 3.30 oh
Kepala Tukang 0.06 OH 77.00 = 4.62 OH 14 hari = 0.33 oh
Mandor 0.075 OH 77.00 = 5.78 OH 14 hari = 0.41 oh
● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 17

Pasangan dinding Bata Merah Kls. 1, 1/2 bata 1 : 5 70 m2


Bahan : Koef. Volume Jumlah
Bata merah 70 buah 70.00 = 4,900.00 kg
Portland Cement 9.68 Kg 70.00 = 677.60 ls
Pasir Pasang 0.045 m3 70.00 = 3.15 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.300 OH 70.00 = 21.00 OH 3 hari = 7.00 oh
Tukang batu 0.100 OH 70.00 = 7.00 OH 3 hari = 2.33 oh
Kepala Tukang 0.010 OH 70.00 = 0.70 OH 3 hari = 0.23 oh
Mandor 0.015 OH 70.00 = 1.05 OH 3 hari = 0.35 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

plesteran dinding 1 : 5 140 m2


Bahan : Koef. Volume Jumlah
Semen Portland 7.290 Kg 140.00 = 1,020.60 Kg
Pasir Pasang 0.028 M3 140.00 = 3.92 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 oh 140.00 = 14.00 OH 3 hari = 4.67 oh
Tukang 0.120 oh 140.00 = 16.80 OH 3 hari = 5.60 oh
Kepala Tukang 0.020 oh 140.00 = 2.80 OH 3 hari = 0.93 oh
Mandor 0.013 oh 140.00 = 1.75 OH 3 hari = 0.58 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

plesteran Acian dinding 140 m2


Bahan : Koef. Volume Jumlah
Semen Portland 4.000 Kg 140.00 = 560.00 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.143 oh 140.00 = 20.02 OH 3 hari = 6.67 oh
Tukang 0.107 oh 140.00 = 14.98 OH 3 hari = 4.99 oh
Kepala Tukang 0.011 oh 140.00 = 1.47 OH 3 hari = 0.49 oh
Mandor 0.010 oh 140.00 = 1.40 OH 3 hari = 0.47 oh
● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

pengecatan Dinding Exterior, sek. Vinilex 140 m2


Bahan : Koef. Volume Jumlah
Plamir 0.100 Kg 140.00 = 14.00 Kg
Cat dasar 0.100 Kg 140.00 = 14.00 Kg
Cat penutup 2 x 0.260 Kg 140.00 = 36.40 Kg
Ampelas 0.100 Lbr 140.00 = 14.00 Lbr
Roll Cat 0.025 Bh 140.00 = 3.50 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.040 oh 140.00 = 5.60 OH 3 hari = 1.87 oh
Tukang 0.080 oh 140.00 = 11.20 OH 3 hari = 3.73 oh
Kepala Tukang 0.008 oh 140.00 = 1.12 OH 3 hari = 0.37 oh
Mandor 0.005 oh 140.00 = 0.70 OH 3 hari = 0.23 oh
● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 18

II PEKERJAAN PAGAR

III PEKERJAAN SALURAN

Pekerjaan Saluran tipe 1 262.540 m1


Galian Tanah 212.657 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi ah org/hari
Tukang gali 0.75 oh 212.66 = 159.49 OH 28 hari = 5.70 oh
Mandor 0.03 oh 212.66 = 5.32 OH 28 hari = 0.19 oh

● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 18

Buangan tanah 212.657 m3


Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.516 oh 212.66 = 109.73 OH 21 hari = 5.23 oh
Mandor 0.050 oh 212.66 = 10.63 OH 21 hari = 0.51 oh

● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 18

Batu Belah 137.834 m3


Bahan : Koef. Volume Jumlah
Batu belah 15 cm/20 cm 1.200 M³ 137.83 = 165.40 M³
Portland Cement 202.000 Kg 137.83 = 27,842.37 Kg
Pasir Pasang 0.485 M³ 137.83 = 66.85 M³
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 1.500 oh 137.83 = 206.75 OH 21 hari = 9.85 oh
Tukang 0.600 oh 137.83 = 82.70 OH 21 hari = 3.94 oh
Kepala Tukang 0.060 oh 137.83 = 8.27 OH 21 hari = 0.39 oh
Mandor 0.075 oh 137.83 = 10.34 OH 21 hari = 0.49 oh
● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 18

Pekerjaan Saluran tipe 2 21.25 m1

Galian Tanah 17.211 m3


Tenaga Kerja : Koef. Volume Jumlah Durasi ah org/hari
Tukang gali 0.75 oh 17.21 = 12.91 OH 3 hari = 4.30 oh
Mandor 0.03 oh 17.21 = 0.43 OH 3 hari = 0.14 oh

● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 18

Buangan tanah 17.211 m3


Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.516 oh 17.21 = 8.88 OH 3 hari = 2.96 oh
Mandor 0.050 oh 17.21 = 0.86 OH 3 hari = 0.29 oh

● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 18

Batu Belah 11.155 m3


Bahan : Koef. Volume Jumlah
Batu belah 15 cm/20 cm 1.200 M³ 11.16 = 13.39 M³
Portland Cement 202.000 Kg 11.16 = 2,253.35 Kg
Pasir Pasang 0.485 M³ 11.16 = 5.41 M³
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 1.500 oh 11.16 = 16.73 OH 21 hari = 0.80 oh
Tukang 0.600 oh 11.16 = 6.69 OH 21 hari = 0.32 oh
Kepala Tukang 0.060 oh 11.16 = 0.67 OH 21 hari = 0.03 oh
Mandor 0.075 oh 11.16 = 0.84 OH 21 hari = 0.04 oh
● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 18

Plat Decker Beton K-250 t=15 cm 2.677 m3


Beton Mutu K-250 2.677 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 2.68 = 2.68
Alat bantu 1.000 m3 2.68 = 2.68
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 18

Besi Beton Tul.melintang 2x Ø 10 mm-150 mm 106.662 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 106.66 = 111.99 Kg
kawat beton 0.015 m3 106.66 = 1.60 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 106.66 = 0.75 OH 1 hari = 0.75 oh
Tukang 0.007 OH 106.66 = 0.75 OH 1 hari = 0.75 oh
Kepala tukang 0.007 OH 106.66 = 0.75 OH 1 hari = 0.75 oh
Mandor 0.000 OH 106.66 = 0.03 OH 1 hari = 0.03 oh
● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 18

Besi Beton Tul.memanjang 2x Ø10 mm-150 mm 106.662 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 106.66 = 111.99 Kg
kawat beton 0.015 m3 106.66 = 1.60 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 106.66 = 0.75 OH 3 hari = 0.25 oh
Tukang 0.007 OH 106.66 = 0.75 OH 3 hari = 0.25 oh
Kepala tukang 0.007 OH 106.66 = 0.75 OH 3 hari = 0.25 oh
Mandor 0.000 OH 106.66 = 0.03 OH 3 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 18

Bekisting Lantai 22.370 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.030 M3 22.37 = 0.67 M3
Paku 5 cm- 10 cm 0.300 Kg 22.37 = 6.71 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.520 OH 22.37 = 11.63 OH 7 hari = 1.66 oh
Tukang 0.260 OH 22.37 = 5.82 OH 7 hari = 0.83 oh
Kepala tukang 0.026 OH 22.37 = 0.58 OH 7 hari = 0.08 oh
Mandor 0.026 OH 22.37 = 0.58 OH 7 hari = 0.08 oh
● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 18

IV . POS JAGA (TAHAP BERIKUTNYA)


V . GROUNDTANK (TAHAP BERIKUTNYA)
VI . RUMAH PANEL
I PEKERJAAN PERSIAPAN
Pekerjaan Pengukuran/bouwplank 12.00 m'
Bahan : Koef. Volume Jumlah
Kayu Klas II & III 0.012 M3 12.00 = 0.14 M3
Paku 5cm- 7cm 0.020 Kg 12.00 = 0.24 Kg

0.007
Kayu Papan 3/20 cm Klas II/Klas III M3 12.00 = 0.08 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari

0.100 oh
Pekerja 12.00 = 1.20 OH 21 hari = 0.06 oh
Tukang 0.100 oh 12.00 = 1.20 OH 21 hari = 0.06 oh

0.010 oh
Kepala Tukang 12.00 = 0.12 OH 21 hari = 0.01 oh
Mandor 0.005 oh 12.00 = 0.06 OH 21 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 18

II PEKERJAAN GALIAN TANAH & URUGAN PASIR


PEKERJAAN GALIAN TANAH & URUGAN PASIR

Pek. Galian Tanah Pondasi batu belah Menerus 5.04 m3


Tenaga Kerja : Koef. Volume Jumlah Durasi ah org/hari
Tukang gali 0.75 oh 5.04 = 3.78 OH 3 hari = 1.26 oh
Mandor 0.03 oh 5.04 = 0.13 OH 3 hari = 0.04 oh
● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 1

Pek. Galian Tanah Pondasi batu belah Setempat 1.57 m3


Tenaga Kerja : Koef. Volume Jumlah Durasi ah org/hari
Tukang gali 0.75 oh 1.57 = 1.18 OH 3 hari = 0.39 oh
Mandor 0.03 oh 1.57 = 0.04 OH 3 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 1

Pek. Urugan Tanah Kembali bks Galian Pondasi 1.32 m3


Tenaga Kerja : Koef. Volume Jumlah Durasi ah org/hari
Pekerja 0.19 oh 1.32 = 0.25 OH 3 hari = 0.08 oh
Mandor 0.02 oh 1.32 = 0.03 OH 3 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 1

III PEKERJAAN PONDASI

Pek. Pondasi Batu Belah Menerus camp. 1Pc : 3Psr 3.78 m3


Bahan : Koef. Volume Jumlah
Batu belah 15 cm/20 cm 1.2 M³ 3.78 = 4.54 m3
Portland Cement 202 Kg 3.78 = 763.56 Kg
Pasir Pasang 0.485 M³ 3.78 = 1.83 m3
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 1.5 OH 3.78 = 5.67 OH 1 hari = 5.67 oh
Tukang las konstruksi 0.6 OH 3.78 = 2.27 OH 1 hari = 2.44 oh
Kepala Tukang 0.06 OH 3.78 = 0.23 OH 1 hari = 0.24 oh
Mandor 0.075 OH 3.78 = 0.28 OH 1 hari = 0.24 oh

● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 1

Pek. Pondasi Batu Belah Setempat camp. 1Pc : 3Psr 0.85 m3


Bahan : Koef. Volume Jumlah
Batu belah 15 cm/20 cm 1.2 M³ 0.85 = 1.02 m3
Portland Cement 202 Kg 0.85 = 171.09 Kg
Pasir Pasang 0.485 M³ 0.85 = 0.41 m3
Tenaga Kerja : Volume Jumlah Durasi Jumlah org/hari
Pekerja 1.5 OH 0.85 = 1.27 OH 1 hari = 1.27 oh
Tukang las konstruksi 0.6 OH 0.85 = 0.51 OH 1 hari = 2.44 oh
Kepala Tukang 0.06 OH 0.85 = 0.05 OH 1 hari = 0.24 oh
Mandor 0.075 OH 0.85 = 0.06 OH 1 hari = 0.24 oh

● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 1

Pek. Urugan Pasir Urug Bawah Pondasi Batu Belah Menerus t=10cm 0.72 m3
Bahan : Koef. Volume Jumlah
Pasir Urug 1.200 M3 0.72 = 0.86 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.300 oh 0.72 = 0.22 OH 1 hari = 0.22 oh
Mandor 0.010 oh 0.72 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 1

Pek. Urugan Pasir Urug Bawah Pondasi Batu Belah Setempat t=10cm 0.14 m3
Bahan : Koef. Volume Jumlah
Pasir Urug 1.200 M3 0.14 = 0.17 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.300 oh 0.14 = 0.04 OH 1 hari = 0.04 oh
Mandor 0.010 oh 0.14 = 0.00 OH 1 hari = 0.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 1 s/d minggu ke 1

IV PEKERJAAN BETON

Pek. Beton Sloof 15/20, K-225 ( tul.144,88 kg/m3besi+bekisting) 0.360 m3


Beton Mutu K-225 0.360 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.225 1.000 m3 0.36 = 0.36
Alat bantu 1.000 m3 0.36 = 0.36
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 2 s/d minggu ke 2

Besi Beton 6Ø12mm-(150)mm 19.094 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 19.09 = 20.05 Kg
kawat beton 0.015 m3 19.09 = 0.29 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 19.09 = 0.13 OH 3 hari = 0.04 oh
Tukang 0.007 OH 19.09 = 0.13 OH 3 hari = 0.04 oh
Kepala tukang 0.007 OH 19.09 = 0.13 OH 3 hari = 0.04 oh
Mandor 0.000 OH 19.09 = 0.01 OH 3 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 2 s/d minggu ke 2

Besi Beton Cincin Ø8mm-(150) mm 12.478 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 12.48 = 13.10 Kg
kawat beton 0.015 m3 12.48 = 0.19 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 12.48 = 0.09 OH 1 hari = 0.09 oh
Tukang 0.007 OH 12.48 = 0.09 OH 1 hari = 0.09 oh
Kepala tukang 0.007 OH 12.48 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.000 OH 12.48 = 0.00 OH 1 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 18

Bekisting Pondasi 3.600 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.030 M3 3.60 = 0.11 Kg
Paku 5 cm- 10 cm 0.300 Kg 3.60 = 1.08 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.520 OH 3.60 = 1.87 OH 1 hari = 1.87 oh
Tukang 0.260 OH 3.60 = 0.94 OH 1 hari = 0.94 oh
Kepala tukang 0.026 OH 3.60 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.026 OH 3.60 = 0.09 OH 1 hari = 0.09 oh
● Rencana Waktu Pelaksanaan : Minggu ke 2 s/d minggu ke 2

Pek. Beton Kolom Praktis 15/15, K-225 (tul.181,81 kg/m3besi+bekisting) 0.320 m3


Beton Mutu K-225 0.320 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.225 1.000 m3 0.32 = 0.32
Alat bantu 1.000 m3 0.32 = 0.32
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 2 s/d minggu ke 2

Besi Beton 6Ø12mm-(150)mm 16.973 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 16.97 = 17.82 Kg
kawat beton 0.015 m3 16.97 = 0.25 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 16.97 = 0.12 OH 3 hari = 0.04 oh
Tukang 0.007 OH 16.97 = 0.12 OH 3 hari = 0.04 oh
Kepala tukang 0.007 OH 16.97 = 0.12 OH 3 hari = 0.04 oh
Mandor 0.000 OH 16.97 = 0.01 OH 3 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 2 s/d minggu ke 2

Besi Beton Cincin Ø8mm-(150) mm 11.091 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 11.09 = 11.65 Kg
kawat beton 0.015 m3 11.09 = 0.17 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 11.09 = 0.08 OH 1 hari = 0.08 oh
Tukang 0.007 OH 11.09 = 0.08 OH 1 hari = 0.08 oh
Kepala tukang 0.007 OH 11.09 = 0.08 OH 1 hari = 0.08 oh
Mandor 0.000 OH 11.09 = 0.00 OH 1 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 2 s/d minggu ke 2
Bekisting KOLOM 3.200 m2
Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.030 M3 3.20 = 0.10 Kg
Paku 5 cm- 10 cm 0.300 Kg 3.20 = 0.96 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.520 OH 3.20 = 1.66 OH 1 hari = 1.66 oh
Tukang 0.260 OH 3.20 = 0.83 OH 1 hari = 0.83 oh
Kepala tukang 0.026 OH 3.20 = 0.08 OH 1 hari = 0.08 oh
Mandor 0.026 OH 3.20 = 0.08 OH 1 hari = 0.08 oh
● Rencana Waktu Pelaksanaan : Minggu ke 2 s/d minggu ke 2

Pek. Beton Ring Balok 15/20, K-225 ( tul.186,21 kg/m3besi+bekisting) 0.180 m3


Beton Mutu K-225 0.180 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.225 1.000 m3 0.18 = 0.18
Alat bantu 1.000 m3 0.18 = 0.18
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS - LS 5 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 3

Besi Beton 6Ø12mm-(150)mm 9.547 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 9.55 = 10.02 Kg
kawat beton 0.015 m3 9.55 = 0.14 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 9.55 = 0.07 OH 3 hari = 0.02 oh
Tukang 0.007 OH 9.55 = 0.07 OH 3 hari = 0.02 oh
Kepala tukang 0.007 OH 9.55 = 0.07 OH 3 hari = 0.02 oh
Mandor 0.000 OH 9.55 = 0.00 OH 3 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 3

Besi Beton Cincin Ø8mm-(150) mm 6.239 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 6.24 = 6.55 Kg
kawat beton 0.015 m3 6.24 = 0.09 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 6.24 = 0.04 OH 1 hari = 0.04 oh
Tukang 0.007 OH 6.24 = 0.04 OH 1 hari = 0.04 oh
Kepala tukang 0.007 OH 6.24 = 0.04 OH 1 hari = 0.04 oh
Mandor 0.000 OH 6.24 = 0.00 OH 1 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 3

Bekisting Balok 1.800 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.034 m3 1.80 = 0.06 Kg
Paku 5 cm-12cm 0.400 kg 1.80 = 0.72 Kg
Balok kayu kelas lII 0.010 m3 1.80 = 0.02 Kg
Plywood Tebal 9mm 0.350 Lbr 1.80 = 0.63 Kg
Perancah kayu kelas lII 0.056 m3 1.80 = 0.10 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.520 OH 1.80 = 0.94 OH 1 hari = 0.94 oh
Tukang 0.260 OH 1.80 = 0.47 OH 1 hari = 0.47 oh
Kepala tukang 0.026 OH 1.80 = 0.05 OH 1 hari = 0.05 oh
Mandor 0.026 OH 1.80 = 0.05 OH 1 hari = 0.05 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 3

V PEKERJAAN BETON LANTAI DAN DAK

Pek. Beton Plat Dak t= 10 cm, K-250 ( tul.79,68 kg/m3besi+bekisting) 1.23 m3


Beton Mutu K-250 1.230 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 1.23 = 1.23 m3
Alat bantu 1.000 m3 1.23 = 1.23 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS 1.23 1.23 LS 1 hari = 1.00 LS
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4
Besi Beton Tul.melintang 2x Ø 10 mm-150 mm 49.003 kg
Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 1.23 = 1.29 Kg
kawat beton 0.015 Kg 1.23 = 0.02 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 1.23 = 0.01 OH 1 hari = 0.01 oh
Tukang 0.007 OH 1.23 = 0.01 OH 1 hari = 0.01 oh
Kepala tukang 0.007 OH 1.23 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.000 OH 1.23 = 0.00 OH 1 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Besi Beton Tul.memanjang 2x Ø10 mm-150 mm 49.003 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 1.23 = 1.29 Kg
kawat beton 0.015 Kg 1.23 = 0.02 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 1.23 = 0.01 OH 1 hari = 0.01 oh
Tukang 0.007 OH 1.23 = 0.01 OH 1 hari = 0.01 oh
Kepala tukang 0.007 OH 1.23 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.000 OH 1.23 = 0.00 OH 1 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Bekisting Lantai 10.277 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.030 M3 1.23 = 0.04 M3
Paku 5 cm- 10 cm 0.300 Kg 1.23 = 0.37 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.520 OH 1.23 = 0.64 OH 7 hari = 0.09 oh
Tukang 0.260 OH 1.23 = 0.32 OH 7 hari = 0.05 oh
Kepala tukang 0.026 OH 1.23 = 0.03 OH 7 hari = 0.00 oh
Mandor 0.026 OH 1.23 = 0.03 OH 7 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Pek. Beton Kanopi t= 10 cm, K-250 ( tul.79,68 kg/m3besi+bekisting) 0.33 m3


Beton Mutu K-250 0.330 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 0.33 = 0.33 m3
Alat bantu 1.000 m3 0.33 = 0.33 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS 0.33 0.33 LS 1 hari = 1.00 LS
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Besi Beton Tul.melintang 2x Ø 10 mm-150 mm 13.147 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 0.33 = 0.35 Kg
kawat beton 0.015 Kg 0.33 = 0.00 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 0.33 = 0.00 OH 1 hari = 0.00 oh
Tukang 0.007 OH 0.33 = 0.00 OH 1 hari = 0.00 oh
Kepala tukang 0.007 OH 0.33 = 0.00 OH 1 hari = 0.00 oh
Mandor 0.000 OH 0.33 = 0.00 OH 1 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Besi Beton Tul.memanjang 2x Ø10 mm-150 mm 13.147 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 0.33 = 0.35 Kg
kawat beton 0.015 Kg 0.33 = 0.00 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 0.33 = 0.00 OH 1 hari = 0.00 oh
Tukang 0.007 OH 0.33 = 0.00 OH 1 hari = 0.00 oh
Kepala tukang 0.007 OH 0.33 = 0.00 OH 1 hari = 0.00 oh
Mandor 0.000 OH 0.33 = 0.00 OH 1 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Bekisting Lantai 2.757 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.030 M3 0.33 = 0.01 M3
Paku 5 cm- 10 cm 0.300 Kg 0.33 = 0.10 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.520 OH 0.33 = 0.17 OH 7 hari = 0.02 oh
Tukang 0.260 OH 0.33 = 0.09 OH 7 hari = 0.01 oh
Kepala tukang 0.026 OH 0.33 = 0.01 OH 7 hari = 0.00 oh
Mandor 0.026 OH 0.33 = 0.01 OH 7 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 3 s/d minggu ke 4

Pek. Beton Lantai Kerja K-175 0.9 m3


Bahan : Koef. Volume Jumlah
Portland Cement 210.000 Kg 0.90 = 189.00 Kg
Pasir Beton 0.300 m3 0.90 = 0.27 m3
KR maks. 30 mm 0.500 m3 0.90 = 0.45 m3
Air 215.000 Liter 0.90 = 193.50 Liter
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 1.650 OH 0.90 = 1.49 OH 1 hari = 1.49 oh
Tukang 0.275 OH 0.90 = 0.25 OH 1 hari = 0.25 oh
Kepala tukang 0.028 OH 0.90 = 0.03 OH 1 hari = 0.03 oh
Mandor 0.083 OH 0.90 = 0.07 OH 1 hari = 0.07 oh
● Rencana Waktu Pelaksanaan : Minggu ke 4 s/d minggu ke 4

Pek. Beton Plat Lantai t= 10 cm, K-250 ( tul.79,68 kg/m3besi+bekisting) 0.9 m3


Beton Mutu K-250 0.900 m3
Bahan : Koef. Volume Jumlah
Beton Ready Mix K.250 1.000 m3 0.90 = 0.90 m3
Alat bantu 1.000 m3 0.90 = 0.90 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
1.000 LS 0.90 0.90 LS 1 hari = 1.00 LS
● Rencana Waktu Pelaksanaan : Minggu ke 4 s/d minggu ke 4

Besi Beton Tul.melintang 2x Ø 10 mm-150 mm 35.856 kg


Bahan : Koef. Volume Jumlah
Besi beton( ulir ) 1.050 Kg 0.90 = 0.95 Kg
kawat beton 0.015 Kg 0.90 = 0.01 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 0.90 = 0.01 OH 1 hari = 0.01 oh
Tukang 0.007 OH 0.90 = 0.01 OH 1 hari = 0.01 oh
Kepala tukang 0.007 OH 0.90 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.000 OH 0.90 = 0.00 OH 1 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 4 s/d minggu ke 4

Besi Beton Tul.memanjang 2x Ø10 mm-150 mm 35.856 kg


Bahan : Koef. Volume Jumlah
Besi beton Polos 1.050 Kg 0.90 = 0.95 Kg
kawat beton 0.015 Kg 0.90 = 0.01 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.007 OH 0.90 = 0.01 OH 1 hari = 0.01 oh
Tukang 0.007 OH 0.90 = 0.01 OH 1 hari = 0.01 oh
Kepala tukang 0.007 OH 0.90 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.000 OH 0.90 = 0.00 OH 1 hari = 0.00 oh
● Rencana Waktu Pelaksanaan : Minggu ke 4 s/d minggu ke 4

Bekisting Lantai 7.520 m2


Bahan : Koef. Volume Jumlah
Kayu kelas lll 0.030 M3 0.90 = 0.03 M3
Paku 5 cm- 10 cm 0.300 Kg 0.90 = 0.27 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.520 OH 0.90 = 0.47 OH 2 hari = 0.23 oh
Tukang 0.260 OH 0.90 = 0.23 OH 2 hari = 0.12 oh
Kepala tukang 0.026 OH 0.90 = 0.02 OH 2 hari = 0.01 oh
Mandor 0.026 OH 0.90 = 0.02 OH 2 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 4 s/d minggu ke 4

VI PEK. DINDING, PLESTERAN DAN ACIAN

Pasangan dinding Bata Merah Kls. 1, 1/2 campr 1 : 5 36 m2


Bahan : Koef. Volume Jumlah
Bata merah 70 buah 36.00 = 2,520.00 kg
Portland Cement 9.68 Kg 36.00 = 348.48 ls
Pasir Pasang 0.045 m3 36.00 = 1.62 m2
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.300 OH 36.00 = 10.80 OH 2 hari = 5.40 oh
Tukang batu 0.100 OH 36.00 = 3.60 OH 2 hari = 1.80 oh
Kepala Tukang 0.010 OH 36.00 = 0.36 OH 2 hari = 0.18 oh
Mandor 0.015 OH 36.00 = 0.54 OH 2 hari = 0.27 oh

● Rencana Waktu Pelaksanaan : Minggu ke 2 s/d minggu ke 2

Pekerjaan plesteran dinding 1 : 5 72 m2


Bahan : Koef. Volume Jumlah
Semen Portland 7.290 Kg 72.00 = 524.88 Kg
Pasir Pasang 0.028 M3 72.00 = 2.02 M3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 oh 72.00 = 7.20 OH 2 hari = 3.60 oh
Tukang 0.120 oh 72.00 = 8.64 OH 2 hari = 4.32 oh
Kepala Tukang 0.020 oh 72.00 = 1.44 OH 2 hari = 0.72 oh
Mandor 0.013 oh 72.00 = 0.90 OH 2 hari = 0.45 oh
● Rencana Waktu Pelaksanaan : Minggu ke 2 s/d minggu ke 2

Pekerjaan acian dinding dan Plafond Expose Beton 82.24 m2


Bahan : Koef. Volume Jumlah
Semen Portland 4.000 Kg 82.24 = 328.96 Kg
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.143 oh 82.24 = 11.76 OH 2 hari = 5.88 oh
Tukang 0.107 oh 82.24 = 8.80 OH 2 hari = 4.40 oh
Kepala Tukang 0.011 oh 82.24 = 0.86 OH 2 hari = 0.43 oh
Mandor 0.010 oh 82.24 = 0.82 OH 2 hari = 0.41 oh
● Rencana Waktu Pelaksanaan : Minggu ke 2 s/d minggu ke 2

VII PEK. KUSEN, DAUN PINTU DAN DAUN JENDELA ALUMUNIUM

Pek. Pas. Kusen & Pintu Besi (Lkp engsel,kunci dan assr) 1 Unit
Bahan : Koef. Volume Jumlah
Kusen dan Pintu Besi 1.000 unit 1.00 = 1.00 m3
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pekerja 0.400 OH 1.00 = 0.40 OH 1 hari = 0.40 oh
Tukang 1.200 OH 1.00 = 1.20 OH 1 hari = 1.20 oh
Kepala tukang OH 1.00 = - OH 1 hari = - oh
Mandor OH 1.00 = - OH 1 hari = - oh
● Rencana Waktu Pelaksanaan : Minggu ke 2 s/d minggu ke 2

Pek. Pas. Kusen Type L3 2 Unit


Bahan : Koef. Volume Jumlah
Kusen Aluminium Natural 4" Jendela 5.8 M1 2.00 = 11.60 M1
Bilah Louvre 0.64 M2 2.00 = 1.28 M2
Asesoris Kusen Alumunium (35% dr bahan ) 1 Ls 2.00 = 2.00 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Upah Pasang 1 Ls 2.00 = 2.00 Ls 2.00 hari = 1.00 oh
Alat Bantu 1 Ls 2.00 = 2.00 Ls 2.00 hari = 1.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 2 s/d minggu ke 2

VIII PEK. PENGECATAN

Pekerjaan Pengecatan Dinding Interior, sek. Vinilex 36.00 m2


Bahan : Koef. Volume Jumlah
Cat dasar 0.200 Kg 36.00 = 7.20 Kg
Cat penutup 2 x Vinilex 0.260 Kg 36.00 = 9.36 Kg
Ampelas 0.100 Lbr 36.00 = 3.60 Lbr
Roll Cat 0.025 Bh 36.00 = 0.90 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.040 oh 36.00 = 1.44 OH 2 hari = 0.72 oh
Tukang 0.080 oh 36.00 = 2.88 OH 2 hari = 1.44 oh
Kepala Tukang 0.008 oh 36.00 = 0.29 OH 2 hari = 0.14 oh
Mandor 0.005 oh 36.00 = 0.18 OH 2 hari = 0.09 oh
● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

Pekerjaan pengecatan dinding Exterior, sek. Vinilex 36.00 m2


Bahan : Koef. Volume Jumlah
Plamir 0.100 Kg 36.00 = 3.60 Kg
Cat dasar 0.100 Kg 36.00 = 3.60 Kg
Cat penutup 2 x 0.260 Kg 36.00 = 9.36 Kg
Ampelas 0.100 Lbr 36.00 = 3.60 Lbr
Roll Cat 0.025 Bh 36.00 = 0.90 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.040 oh 36.00 = 1.44 OH 2 hari = 0.72 oh
Tukang 0.080 oh 36.00 = 2.88 OH 2 hari = 1.44 oh
Kepala Tukang 0.008 oh 36.00 = 0.29 OH 2 hari = 0.14 oh
Mandor 0.005 oh 36.00 = 0.18 OH 2 hari = 0.09 oh
● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

Pekerjaan pengecatan Plafond Beton Ekspos, sek. Vinilex 12.25 m2


Bahan : Koef. Volume Jumlah
Plamir 0.050 Kg 12.25 = 0.61 Kg
Cat dasar 0.100 Kg 12.25 = 1.23 Kg
Cat penutup 2 x 0.260 Kg 12.25 = 3.19 Kg
Ampelas 0.100 Lbr 12.25 = 1.23 Lbr
Roll Cat 0.025 Bh 12.25 = 0.31 Bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.040 oh 12.25 = 0.49 OH 2 hari = 0.25 oh
Tukang 0.080 oh 12.25 = 0.98 OH 2 hari = 0.49 oh
Kepala Tukang 0.008 oh 12.25 = 0.10 OH 2 hari = 0.05 oh
Mandor 0.005 oh 12.25 = 0.06 OH 2 hari = 0.03 oh
● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

Pek. Laburan Waterproofing Cementitious Dak Beton, sek. Sika 12.25 m2


Bahan : Koef. Volume Jumlah
Waterproofimg Cementitious 0.5 Kg 12.25 = 6.13 M1
Ampelas 0.5 lbr 12.25 = 6.13 M2
Kwas 3" 0.01 bh 12.25 = 0.12 Ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.02 Oh 12.25 = 0.25 Ls 2.00 hari = 0.12 oh
Tukang cat 0.2 Oh 12.25 = 2.45 Ls 2.00 hari = 1.23 oh
Kepala tukang cat 0.02 Oh 12.25 = 0.25 Ls 2.00 hari = 0.12 oh
Mandor 0.01 Oh 12.25 = 0.12 Ls 2.00 hari = 0.06 oh

● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

PEKERJAAN MEKANIKAL ELEKTRIKAL

BANGUNAN UTAMA PASAR

I PEKERJAAN LANTAI BASEMENT

I PEKERJAAN LANTAI I
PEKERJAAN PANEL
Panel PP - lantai 2 1.00 unit
Bahan : Koef. Volume Jumlah
MCB 200 A 3PH 1.000 bh 1.00 bh 1.00 bh
MCB 25 A 3 PH 1.000 bh 1.00 bh 1.00 bh
MCB 10 A 1 PH 1.000 bh 1.00 bh 1.00 bh
Pilot Lamp 1.000 set 1.00 set 1.00 set
Fuse Pilot Lamp 1.000 set 1.00 set 1.00 set
Wiring & Busbar 1.000 set 1.00 set 1.00 set
Panel Kosong uk. 70 x 90 x 30 cm 1.000 set 1.00 set 1.00 set
Ongkos Pasang & stel 1.000 lot 1.00 lot 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Tukang Listrik 1.000 oh 1.00 oh 1.00 oh 1.00 hari = 1.00 oh
Pekerja 1.000 oh 1.00 oh 1.00 oh 1.00 hari = 1.00 oh
Mandor 1.000 ih 1.00 ih 1.00 ih 1.00 hari = 1.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 17

kWh Meter 1 PH (incl. Box MCB & Accesories) 150.00 unit


Bahan : Koef. Volume Jumlah
KWH Meter 1 PH 1.00 m 150.00 m 150.00 m
MCB Box 1.00 bh 150.00 bh 150.00 bh
MCB 4 A 1 PH 1.00 bh 150.00 bh 150.00 bh
MCB 2 A 1 PH 3.00 bh 150.00 bh 450.00 bh
NYM Standart 3 x 2,5 mm2 15.00 m 150.00 m 2,250.00 m
Peralatan Bantu 1.00 lot 150.00 lot 150.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.275 OH 150.00 = 41.25 Ls 7 hari = 5.89 oh
Tukang 0.500 OH 150.00 = 75.00 Ls 7 hari = 10.71 oh
kepala tukang 0.050 OH 150.00 = 7.50 Ls 7 hari = 1.07 oh
Mandor 0.017 OH 150.00 = 2.50 Ls 7 hari = 0.36 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 17

Kabel Feeder dari LVMDP ke :


Panel PP -Lantai 2 NYFGbY 4 x 35 mm2 110 m
Bahan : Koef. Volume Jumlah
NYFGbY 4 x 35 mm2 1.00 m 110.00 m 110.00 m
Peralatan Bantu 1.00 bh 110.00 bh 110.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.120 OH 110.00 = 13.20 Ls 3 hari = 4.40 oh
Tukang 0.175 OH 110.00 = 19.25 Ls 3 hari = 6.42 oh
kepala tukang 0.018 OH 110.00 = 1.93 Ls 3 hari = 0.64 oh
Mandor 0.006 OH 110.00 = 0.64 Ls 3 hari = 0.21 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 16

Kabel Feeder dari PP -Lantai 2 ke :


Kios kelompok 1 NYY 4 x 6 mm2 100 m
Bahan : Koef. Volume Jumlah
NYY 4 x 6 mm2 1.00 m 100.00 m 100.00 m
Peralatan Bantu 1.00 bh 100.00 bh 100.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.120 OH 100.00 = 12.00 Ls 7 hari = 1.71 oh
Tukang 0.175 OH 100.00 = 17.50 Ls 7 hari = 2.50 oh
kepala tukang 0.018 OH 100.00 = 1.75 Ls 7 hari = 0.25 oh
Mandor 0.006 OH 100.00 = 0.58 Ls 7 hari = 0.08 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 16

Kios kelompok 2 NYY 4 x 6 mm2 90 m


Bahan : Koef. Volume Jumlah
NYY 4 x 6 mm2 1.00 m 90.00 m 90.00 m
Peralatan Bantu 1.00 bh 90.00 bh 90.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.120 OH 90.00 = 10.80 Ls 7 hari = 1.54 oh
Tukang 0.175 OH 90.00 = 15.75 Ls 7 hari = 2.25 oh
kepala tukang 0.018 OH 90.00 = 1.58 Ls 7 hari = 0.23 oh
Mandor 0.006 OH 90.00 = 0.53 Ls 7 hari = 0.07 oh

● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 12

Kios kelompok 3 NYY 4 x 6 mm2 40 m


Bahan : Koef. Volume Jumlah
NYY 4 x 6 mm2 1.00 m 40.00 m 40.00 m
Peralatan Bantu 1.00 bh 40.00 bh 40.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.120 OH 40.00 = 4.80 Ls 4 hari = 1.20 oh
Tukang 0.175 OH 40.00 = 7.00 Ls 4 hari = 1.75 oh
kepala tukang 0.018 OH 40.00 = 0.70 Ls 4 hari = 0.18 oh
Mandor 0.006 OH 40.00 = 0.23 Ls 4 hari = 0.06 oh
● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 12

Kios kelompok 4 NYY 4 x 6 mm2 100 m


Bahan : Koef. Volume Jumlah
NYY 4 x 6 mm2 1.00 m 100.00 m 100.00 m
Peralatan Bantu 1.00 bh 100.00 bh 100.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.120 OH 100.00 = 12.00 Ls 7 hari = 1.71 oh
Tukang 0.175 OH 100.00 = 17.50 Ls 7 hari = 2.50 oh
kepala tukang 0.018 OH 100.00 = 1.75 Ls 7 hari = 0.25 oh
Mandor 0.006 OH 100.00 = 0.58 Ls 7 hari = 0.08 oh

● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 12

Kios kelompok 5 NYY 4 x 6 mm2 80 m


Bahan : Koef. Volume Jumlah
NYY 4 x 6 mm2 1.00 m 80.00 = 80.00 m
Peralatan Bantu 1.00 ls 80.00 = 80.00 ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.120 OH 80.00 = 9.60 OH 7 hari = 1.37 oh
Tukang 0.175 OH 80.00 = 14.00 OH 7 hari = 2.00 oh
kepala tukang 0.018 OH 80.00 = 1.40 OH 7 hari = 0.20 oh
Mandor 0.006 OH 80.00 = 0.47 OH 7 hari = 0.07 oh

● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 12

PEKERJAAN KABEL TRAY


Kabel Tray 300 x 50 mm 491.00 m
Bahan : Koef. Volume Jumlah
Tray Cable 300x50 mm 1.00 m 491.00 m 491.00 m
Hanger 1.00 set 491.00 bh 491.00 set
Peralatan Bantu 1.00 lot 491.00 bh 491.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 491.00 = 122.75 OH 21 hari = 5.85 oh
Tukang 0.400 OH 491.00 = 196.40 OH 21 hari = 9.35 oh
kepala tukang 0.040 OH 491.00 = 19.64 OH 21 hari = 0.94 oh
Mandor 0.013 OH 491.00 = 6.55 OH 21 hari = 0.31 oh

● Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 9

Kabel Tray 150 x 50 mm 491.00 m


Bahan : Koef. Volume Jumlah
Tray Cable 150x50 mm 1.00 m 491.00 m 491.00 m
Hanger 1.00 set 491.00 bh 491.00 set
Peralatan Bantu 1.00 lot 491.00 bh 491.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 491.00 = 122.75 OH 14 hari = 8.77 oh
Tukang 0.400 OH 491.00 = 196.40 OH 14 hari = 14.03 oh
kepala tukang 0.040 OH 491.00 = 19.64 OH 14 hari = 1.40 oh
Mandor 0.013 OH 491.00 = 6.55 OH 14 hari = 0.47 oh

● Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 9

Kabel Ladder 300 x 100 mm 5.00 m


Bahan : Koef. Volume Jumlah
Tray Cable 300x100 mm 1.00 m 5.00 m 5.00 m
Hanger 1.00 set 5.00 bh 5.00 set
Peralatan Bantu 1.00 lot 5.00 bh 5.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 5.00 = 1.25 OH 1 hari = 1.25 oh
Tukang 0.400 OH 5.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.040 OH 5.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.013 OH 5.00 = 0.07 OH 1 hari = 0.07 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

Kabel Ladder 150 x 100 mm 5.00 m


Bahan : Koef. Volume Jumlah
Tray Cable 150x100 mm 1.00 m 5.00 m 5.00 m
Hanger 1.00 set 5.00 bh 5.00 set
Peralatan Bantu 1.00 lot 5.00 bh 5.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 5.00 = 1.25 OH 1 hari = 1.25 oh
Tukang 0.400 OH 5.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.040 OH 5.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.013 OH 5.00 = 0.07 OH 1 hari = 0.07 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

PEKERJAAN ELEKTRIKAL
TL LED 1x10 W (V-SHAPE) 147 unit
Bahan : Koef. Volume Jumlah
Lampu TL LED 10 watt 1.00 bh 147.00 m 147.00 bh
Armature Vshape 1.00 bh 147.00 bh 147.00 bh
accessories 1.00 lot 147.00 bh 147.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.046 OH 147.00 = 6.76 OH 7 hari = 0.97 oh
Tukang 0.023 OH 147.00 = 3.38 OH 7 hari = 0.48 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Lampu LED 13 W (incl. fitting & accesories) 153 unit


Bahan : Koef. Volume Jumlah
Lampu LED 13 watt 1.00 bh 153.00 m 153.00 bh
Fitting 1.00 bh 153.00 bh 153.00 bh
accessories 1.00 lot 153.00 bh 153.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.046 OH 153.00 = 7.04 OH 7 hari = 1.01 oh
Tukang 0.023 OH 153.00 = 3.52 OH 7 hari = 0.50 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Lampu LED 8 W (incl. fitting & accesories) 4 unit


Bahan : Koef. Volume Jumlah
Lampu LED 8 watt 1.00 bh 4.00 m 4.00 bh
Fitting 1.00 bh 4.00 bh 4.00 bh
accessories 1.00 lot 4.00 bh 4.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.046 OH 4.00 = 0.18 OH 1 hari = 0.18 oh
Tukang 0.023 OH 4.00 = 0.09 OH 1 hari = 0.09 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Saklar tunggal 153 unit


Bahan : Koef. Volume Jumlah
Saklar Tunggal 1.00 bh 153.00 m 153.00 bh
Peralatan Bantu 1.00 lot 153.00 bh 153.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.020 OH 153.00 = 3.06 OH 7 hari = 0.44 oh
Tukang 0.025 OH 153.00 = 3.83 OH 7 hari = 0.55 oh
kepala tukang 0.003 OH 153.00 = 0.46 OH 7 hari = 0.07 oh
Mandor 0.001 OH 153.00 = 0.15 OH 7 hari = 0.02 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Saklar Ganda 10 unit


Bahan : Koef. Volume Jumlah
Saklar Double 1.00 bh 10.00 m 10.00 bh
Peralatan Bantu 1.00 lot 10.00 bh 10.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.020 OH 10.00 = 0.20 OH 1 hari = 0.20 oh
Tukang 0.025 OH 10.00 = 0.25 OH 1 hari = 0.25 oh
kepala tukang 0.003 OH 10.00 = 0.03 OH 1 hari = 0.03 oh
Mandor 0.001 OH 10.00 = 0.01 OH 1 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Kotak Kontak 302 unit


Bahan : Koef. Volume Jumlah
NYM 3 x 2,5 mm2 13.00 m 302.00 m 3,926.00 m
Pipa High Impact, dia. 1/2" 13.00 m 302.00 bh 3,926.00 m
Peralatan Bantu 1.00 lot 302.00 bh 302.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.150 OH 302.00 = 45.30 OH 7 hari = 6.47 oh
Tukang 0.015 OH 302.00 = 4.53 OH 7 hari = 0.65 oh
Mandor 0.050 OH 302.00 = 15.10 OH 7 hari = 2.16 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Instalansi Penerangan 304 ttk


Bahan : Koef. Volume Jumlah
NYM 3 x 2,5 mm2 11.00 m 304.00 m 3,344.00 m
Pipa High Impact, dia. 1/2" 11.00 m 304.00 bh 3,344.00 m
Peralatan Bantu 1.00 lot 304.00 bh 304.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.150 OH 304.00 = 45.60 OH 7 hari = 6.51 oh
Tukang 0.015 OH 304.00 = 4.56 OH 1 hari = 4.56 oh
Mandor 0.050 OH 304.00 = 15.20 OH 1 hari = 15.20 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Instalansi Kotak Kontak 302 ttk


Bahan : Koef. Volume Jumlah
NYM 3 x 2,5 mm2 13.00 m 302.00 m 3,926.00 m
Pipa High Impact, dia. 1/2" 13.00 m 302.00 bh 3,926.00 m
Peralatan Bantu 1.00 lot 302.00 bh 302.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.150 OH 302.00 = 45.30 OH 7 hari = 6.47 oh
Tukang 0.015 OH 302.00 = 4.53 OH 1 hari = 4.53 oh
Mandor 0.050 OH 302.00 = 15.10 OH 1 hari = 15.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

PEKERJAAN PLUMBING
Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 70.00 m
Bahan : Koef. Volume Jumlah
PVC dia. 1/2” 1.00 m 70.00 m 70.00 m
Hanger & Support 0.28 lot 70.00 bh 19.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 70.00 = 7.00 OH 1 hari = 7.00 oh
Tukang 0.100 OH 70.00 = 7.00 OH 1 hari = 7.00 oh
kepala tukang 0.010 OH 70.00 = 0.70 OH 1 hari = 0.70 oh
Mandor 0.005 OH 70.00 = 0.35 OH 1 hari = 0.35 oh

● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

PVC ø 3/4 inc. 85.00 m


Bahan : Koef. Volume Jumlah
PVC dia. 3/4” 1.00 m 85.00 m 85.00 m
Hanger & Support 0.28 lot 85.00 bh 23.80 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 85.00 = 8.50 OH 1 hari = 8.50 oh
Tukang 0.100 OH 85.00 = 8.50 OH 1 hari = 8.50 oh
kepala tukang 0.010 OH 85.00 = 0.85 OH 1 hari = 0.85 oh
Mandor 0.005 OH 85.00 = 0.43 OH 1 hari = 0.43 oh

● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

PVC ø 1 inc. 75.00 m


Bahan : Koef. Volume Jumlah
PVC dia. 1” 1.00 m 75.00 m 75.00 m
Hanger & Support 0.28 lot 75.00 bh 21.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 75.00 = 7.50 OH 1 hari = 7.50 oh
Tukang 0.100 OH 75.00 = 7.50 OH 1 hari = 7.50 oh
kepala tukang 0.010 OH 75.00 = 0.75 OH 1 hari = 0.75 oh
Mandor 0.005 OH 75.00 = 0.38 OH 1 hari = 0.38 oh

● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

PVC ø 1 1/2 inc. 20.00 m


Bahan : Koef. Volume Jumlah
PVC dia. 1 1/2” 1.00 m 20.00 m 20.00 m
Hanger & Support 0.28 lot 20.00 bh 5.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
Tukang 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.010 OH 20.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.005 OH 20.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

PVC ø 2 inc. 35.00 m


Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 35.00 m 35.00 m
Hanger & Support 0.28 lot 35.00 bh 9.80 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 35.00 = 3.50 OH 1 hari = 3.50 oh
Tukang 0.100 OH 35.00 = 3.50 OH 1 hari = 3.50 oh
kepala tukang 0.010 OH 35.00 = 0.35 OH 1 hari = 0.35 oh
Mandor 0.005 OH 35.00 = 0.18 OH 1 hari = 0.18 oh

● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

PVC (Riser) ø 2 inc. 5.00 m


Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 5.00 m 5.00 m
Hanger & Support 0.28 lot 5.00 bh 1.40 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
Tukang 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
kepala tukang 0.010 OH 5.00 = 0.05 OH 1 hari = 0.05 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

Valve (Class 125 psi) & Accessories


Gate Valve ø 2 inc. 1 unit
Bahan : Koef. Volume Jumlah
Gate Valve dia. 2” 1.00 bh 1.00 m 1.00 bh
Hanger & Support 0.28 lot 1.00 bh 0.28 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
Tukang 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
kepala tukang 0.010 OH 1.00 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.005 OH 1.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 7

Gate Valve ø 3/4 inc. 42 unit


Bahan : Koef. Volume Jumlah
Gate Valve dia. 3/4” 1.00 bh 42.00 m 42.00 bh
Hanger & Support 0.28 lot 42.00 bh 11.76 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 42.00 = 4.20 OH 1 hari = 4.20 oh
Tukang 0.100 OH 42.00 = 4.20 OH 1 hari = 4.20 oh
kepala tukang 0.010 OH 42.00 = 0.42 OH 1 hari = 0.42 oh
Mandor 0.005 OH 42.00 = 0.21 OH 1 hari = 0.21 oh

● Rencana Waktu Pelaksanaan : Minggu ke 7 s/d minggu ke 7


Water Meter ø 3/4 inc. 42 unit
Bahan : Koef. Volume Jumlah
Water Meter 1.00 bh 42.00 m 42.00 bh
Hanger & Support 0.28 lot 42.00 bh 11.76 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 42.00 = 4.20 OH 1 hari = 4.20 oh
Tukang 0.100 OH 42.00 = 4.20 OH 1 hari = 4.20 oh
kepala tukang 0.010 OH 42.00 = 0.42 OH 1 hari = 0.42 oh
Mandor 0.005 OH 42.00 = 0.21 OH 1 hari = 0.21 oh

● Rencana Waktu Pelaksanaan : Minggu ke 8 s/d minggu ke 8

Pipa air kotor (PVC class 10 kg/cm2, incl. accessories)


PVC ø 2 inc. 75 m
Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 75.00 m 75.00 m
Hanger & Support 0.28 lot 75.00 bh 21.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 75.00 = 7.50 OH 4 hari = 1.88 oh
Tukang 0.100 OH 75.00 = 7.50 OH 4 hari = 1.88 oh
kepala tukang 0.010 OH 75.00 = 0.75 OH 4 hari = 0.19 oh
Mandor 0.005 OH 75.00 = 0.38 OH 4 hari = 0.09 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

PVC ø 3 inc. 145 m


Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 145.00 m 145.00 m
Hanger & Support 0.28 lot 145.00 bh 40.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 145.00 = 14.50 OH 4 hari = 3.63 oh
Tukang 0.100 OH 145.00 = 14.50 OH 4 hari = 3.63 oh
kepala tukang 0.010 OH 145.00 = 1.45 OH 4 hari = 0.36 oh
Mandor 0.005 OH 145.00 = 0.73 OH 4 hari = 0.18 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

PVC ø 4 inc. 75 m
Bahan : Koef. Volume Jumlah
PVC dia. 4” 1.00 m 75.00 m 75.00 m
Hanger & Support 0.28 lot 75.00 bh 21.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 75.00 = 7.50 OH 4 hari = 1.88 oh
Tukang 0.100 OH 75.00 = 7.50 OH 4 hari = 1.88 oh
kepala tukang 0.010 OH 75.00 = 0.75 OH 4 hari = 0.19 oh
Mandor 0.005 OH 75.00 = 0.38 OH 4 hari = 0.09 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

PVC (Riser) ø 4 inc. 20 m


Bahan : Koef. Volume Jumlah
PVC dia. 4” 1.00 m 20.00 m 20.00 m
Hanger & Support 0.28 lot 20.00 bh 5.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
Tukang 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.010 OH 20.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.005 OH 20.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

Pipa vent (PVC class 10 kg/cm2, incl. accessories)


PVC ø 1 1/4 inc. 20 m
Bahan : Koef. Volume Jumlah
PVC dia. 1 1/4” 1.00 m 20.00 m 20.00 m
Hanger & Support 0.28 lot 20.00 bh 5.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
Tukang 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.010 OH 20.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.005 OH 20.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

PVC ø 2 inc. 5 m
Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 5.00 m 5.00 m
Hanger & Support 0.28 lot 5.00 bh 1.40 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
Tukang 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
kepala tukang 0.010 OH 5.00 = 0.05 OH 1 hari = 0.05 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

PVC (Riser) ø 3 inc. 5 m


Bahan : Koef. Volume Jumlah
PVC dia. 3” 1.00 m 5.00 m 5.00 m
Hanger & Support 0.28 lot 5.00 bh 1.40 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
Tukang 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
kepala tukang 0.010 OH 5.00 = 0.05 OH 1 hari = 0.05 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

Floor Drain 3 unit


Bahan : Koef. Volume Jumlah
Floor Drain dia. 2” 1.00 unit 3.00 m 3.00 unit
Alat Bantu 0.35 set 3.00 bh 1.05 set
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 3.00 = 0.30 OH 1 hari = 0.30 oh
Tukang 0.100 OH 3.00 = 0.30 OH 1 hari = 0.30 oh
kepala tukang 0.010 OH 3.00 = 0.03 OH 1 hari = 0.03 oh
Mandor 0.005 OH 3.00 = 0.02 OH 1 hari = 0.02 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Clean Out ø 2 inc 2 unit


Bahan : Koef. Volume Jumlah
Clean Out 2" 1.00 unit 2.00 m 2.00 unit
Alat Bantu 0.35 set 2.00 bh 0.70 set
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 2.00 = 0.20 OH 1 hari = 0.20 oh
Tukang 0.100 OH 2.00 = 0.20 OH 1 hari = 0.20 oh
kepala tukang 0.010 OH 2.00 = 0.02 OH 1 hari = 0.02 oh
Mandor 0.005 OH 2.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Clean Out ø 4 inc 2 unit


Bahan : Koef. Volume Jumlah
Clean Out 4" 1.00 unit 2.00 m 2.00 unit
Alat Bantu 0.35 set 2.00 bh 0.70 set
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 2.00 = 0.20 OH 1 hari = 0.20 oh
Tukang 0.100 OH 2.00 = 0.20 OH 1 hari = 0.20 oh
kepala tukang 0.010 OH 2.00 = 0.02 OH 1 hari = 0.02 oh
Mandor 0.005 OH 2.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

PEKERJAAN EXHAUST FAN TAHAP BERIKUTNYA


EXHAUST FAN INCL.INSTALASI & Kotak Kontak TAHAP BERIKUTNYA

Fire extinguiser TAHAP BERIKUTNYA

Pipa Hydrant (BSP Sch 40, incl. accessories)


BSP ø 1 1/2 inc 3 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 1 1/2” 1.00 m3 3.00 m 3.00 m3
Support & Accesories 0.10 lot 3.00 bh 0.30 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 3.00 = 0.32 OH 1 hari = 0.32 oh
Tukang 0.180 OH 3.00 = 0.54 OH 1 hari = 0.54 oh
kepala tukang 0.018 OH 3.00 = 0.05 OH 1 hari = 0.05 oh
Mandor 0.005 OH 3.00 = 0.02 OH 1 hari = 0.02 oh

● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

BSP ø 2 1/2 inc 60 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2 1/2” 1.00 m3 60.00 m 60.00 m3
Support & Accesories 0.10 lot 60.00 bh 6.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 60.00 = 6.48 OH 1 hari = 6.48 oh
Tukang 0.180 OH 60.00 = 10.80 OH 1 hari = 10.80 oh
kepala tukang 0.018 OH 60.00 = 1.08 OH 1 hari = 1.08 oh
Mandor 0.005 OH 60.00 = 0.32 OH 1 hari = 0.32 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

BSP ø 4 inc 5 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 4” 1.00 m3 5.00 m 5.00 m3
Support & Accesories 0.10 lot 5.00 bh 0.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 5.00 = 0.54 OH 1 hari = 0.54 oh
Tukang 0.180 OH 5.00 = 0.90 OH 1 hari = 0.90 oh
kepala tukang 0.018 OH 5.00 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

BSP (riser) ø 6 inc 5 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 6” 1.00 m3 5.00 m 5.00 m3
Support & Accesories 0.10 lot 5.00 bh 0.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 5.00 = 0.54 OH 1 hari = 0.54 oh
Tukang 0.180 OH 5.00 = 0.90 OH 1 hari = 0.90 oh
kepala tukang 0.018 OH 5.00 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 200 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 1” 1.00 m3 200.00 m 200.00 m3
Support & Accesories 0.10 lot 200.00 bh 20.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 200.00 = 21.60 OH 1 hari = 21.60 oh
Tukang 0.180 OH 200.00 = 36.00 OH 1 hari = 36.00 oh
kepala tukang 0.018 OH 200.00 = 3.60 OH 1 hari = 3.60 oh
Mandor 0.005 OH 200.00 = 1.08 OH 1 hari = 1.08 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

BSP ø 1 1/4 inc 15 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 1 1/4” 1.00 m3 15.00 m 15.00 m3
Support & Accesories 0.10 lot 15.00 bh 1.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 15.00 = 1.62 OH 1 hari = 1.62 oh
Tukang 0.180 OH 15.00 = 2.70 OH 1 hari = 2.70 oh
kepala tukang 0.018 OH 15.00 = 0.27 OH 1 hari = 0.27 oh
Mandor 0.005 OH 15.00 = 0.08 OH 1 hari = 0.08 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

BSP ø 1 1/2 inc 80 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 1 1/2” 1.00 m3 80.00 m 80.00 m3
Support & Accesories 0.10 lot 80.00 bh 8.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 80.00 = 8.64 OH 1 hari = 8.64 oh
Tukang 0.180 OH 80.00 = 14.40 OH 1 hari = 14.40 oh
kepala tukang 0.018 OH 80.00 = 1.44 OH 1 hari = 1.44 oh
Mandor 0.005 OH 80.00 = 0.43 OH 1 hari = 0.43 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

BSP ø 2 inc 80 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2” 1.00 m3 80.00 m 80.00 m3
Support & Accesories 0.10 lot 80.00 bh 8.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 80.00 = 8.64 OH 1 hari = 8.64 oh
Tukang 0.180 OH 80.00 = 14.40 OH 1 hari = 14.40 oh
kepala tukang 0.018 OH 80.00 = 1.44 OH 1 hari = 1.44 oh
Mandor 0.005 OH 80.00 = 0.43 OH 1 hari = 0.43 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

BSP ø 2 1/2 inc 50 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2 1/2 ” 1.00 m3 50.00 m 50.00 m3
Support & Accesories 0.10 lot 50.00 bh 5.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 50.00 = 5.40 OH 1 hari = 5.40 oh
Tukang 0.180 OH 50.00 = 9.00 OH 1 hari = 9.00 oh
kepala tukang 0.018 OH 50.00 = 0.90 OH 1 hari = 0.90 oh
Mandor 0.005 OH 50.00 = 0.27 OH 1 hari = 0.27 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

BSP ø 3 inc 25 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 3” 1.00 m3 25.00 m 25.00 m3
Support & Accesories 0.10 lot 25.00 bh 2.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 25.00 = 2.70 OH 1 hari = 2.70 oh
Tukang 0.180 OH 25.00 = 4.50 OH 1 hari = 4.50 oh
kepala tukang 0.018 OH 25.00 = 0.45 OH 1 hari = 0.45 oh
Mandor 0.005 OH 25.00 = 0.14 OH 1 hari = 0.14 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

BSP ø 4 inc 35 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 4” 1.00 m3 35.00 m 35.00 m3
Support & Accesories 0.10 lot 35.00 bh 3.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 35.00 = 3.78 OH 1 hari = 3.78 oh
Tukang 0.180 OH 35.00 = 6.30 OH 1 hari = 6.30 oh
kepala tukang 0.018 OH 35.00 = 0.63 OH 1 hari = 0.63 oh
Mandor 0.005 OH 35.00 = 0.19 OH 1 hari = 0.19 oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

BSP ø 6 inc 10 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 6” 1.00 m3 10.00 m 10.00 m3
Support & Accesories 0.10 lot 10.00 bh 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 10.00 = 1.08 OH 1 hari = 1.08 oh
Tukang 0.180 OH 10.00 = 1.80 OH 1 hari = 1.80 oh
kepala tukang 0.018 OH 10.00 = 0.18 OH 1 hari = 0.18 oh
Mandor 0.005 OH 10.00 = 0.05 OH 1 hari = 0.05 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

BSP (riser) ø 6 inc 5 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 6” 1.00 m3 5.00 m 5.00 m3
Support & Accesories 0.10 lot 5.00 bh 0.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 5.00 = 0.54 OH 1 hari = 0.54 oh
Tukang 0.180 OH 5.00 = 0.90 OH 1 hari = 0.90 oh
kepala tukang 0.018 OH 5.00 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Drain Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 12 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 1” 1.00 m3 12.00 m 12.00 m3
Support & Accesories 0.10 lot 12.00 bh 1.20 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 12.00 = 1.30 OH 1 hari = 1.30 oh
Tukang 0.180 OH 12.00 = 2.16 OH 1 hari = 2.16 oh
kepala tukang 0.018 OH 12.00 = 0.22 OH 1 hari = 0.22 oh
Mandor 0.005 OH 12.00 = 0.06 OH 1 hari = 0.06 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

BSP (riser drain) ø 2 inc 5 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2” 1.00 m3 5.00 m 5.00 m3
Support & Accesories 0.10 lot 5.00 bh 0.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 5.00 = 0.54 OH 1 hari = 0.54 oh
Tukang 0.180 OH 5.00 = 0.90 OH 1 hari = 0.90 oh
kepala tukang 0.018 OH 5.00 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Valve (Class 20 K) & Accessories


Gate Valve ø 1 inc 1 unit
Bahan : Koef. Volume Jumlah
Gate Valve dia. 1” 1.00 bh 1.00 m 1.00 bh
Hanger & Support 0.28 lot 1.00 bh 0.28 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
Tukang 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
kepala tukang 0.010 OH 1.00 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.005 OH 1.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Gate Valve ø 4 inc 1 unit


Bahan : Koef. Volume Jumlah
Gate Valve dia. 1” 1.00 bh 1.00 m 1.00 bh
Hanger & Support 0.28 lot 1.00 bh 0.28 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
Tukang 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
kepala tukang 0.010 OH 1.00 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.005 OH 1.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Pressure Reducing Valve ø 6 inc 1 unit


Bahan : Koef. Volume Jumlah
Pressure Reducing Valve 1.00 bh 1.00 m 1.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Flow switch 1 unit


Bahan : Koef. Volume Jumlah
Flow switch 1.00 bh 1.00 m 1.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Head sprinkler (pendent type) 115 unit


Bahan : Koef. Volume Jumlah
Head sprinkler (pendent type) 1.00 bh 115.00 m 115.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 115.00 = 11.50 OH 1 hari = 11.50 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Branch control valve, terdiri dari 1 set


Gate Valve ø 6 inc
Gate Valve ø 1 inc
Flow switch
Sight glass
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

PEKERJAAN FIRE ALARM TAHAP BERIKUTNYA

PEKERJAAN CCTV BY OWNEER

I PEKERJAAN LANTAI II

PEKERJAAN PANEL
Panel PP - lantai 3 1 unit
Bahan : Koef. Volume Jumlah
MCB 200 A 3PH 1.000 bh 1.00 bh 1.00 bh
MCB 25 A 3 PH 1.000 bh 1.00 bh 1.00 bh
MCB 10 A 1 PH 1.000 bh 1.00 bh 1.00 bh
Pilot Lamp 1.000 set 1.00 set 1.00 set
Fuse Pilot Lamp 1.000 set 1.00 set 1.00 set
Wiring & Busbar 1.000 set 1.00 set 1.00 set
Panel Kosong uk. 70 x 90 x 30 cm 1.000 set 1.00 set 1.00 set
Ongkos Pasang & stel 1.000 lot 1.00 lot 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Tukang Listrik 1.000 oh 1.00 oh 1.00 oh 1.00 hari = 1.00 oh
Pekerja 1.000 oh 1.00 oh 1.00 oh 1.00 hari = 1.00 oh
Mandor 1.000 ih 1.00 ih 1.00 ih 1.00 hari = 1.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 17

kWh Meter 1 PH (incl. Box MCB & Accesories) 135 unit


Bahan : Koef. Volume Jumlah
KWH Meter 1 PH 1.00 m 135.00 m 135.00 m
MCB Box 1.00 bh 135.00 bh 135.00 bh
MCB 4 A 1 PH 1.00 bh 135.00 bh 135.00 bh
MCB 2 A 1 PH 3.00 bh 135.00 bh 405.00 bh
NYM Standart 3 x 2,5 mm2 15.00 m 135.00 m 2,025.00 m
Peralatan Bantu 1.00 lot 135.00 lot 135.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.275 OH 135.00 = 37.13 Ls 7 hari = 5.30 oh
Tukang 0.500 OH 135.00 = 67.50 Ls 7 hari = 9.64 oh
kepala tukang 0.050 OH 135.00 = 6.75 Ls 7 hari = 0.96 oh
Mandor 0.017 OH 135.00 = 2.25 Ls 7 hari = 0.32 oh

● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 17

PEKERJAAN INSTALASI KABEL FEEDER


Kabel Feeder dari LVMDP ke :
Panel PP -Lantai 3 NYFGbY 4 x 35 mm2 120 m
Bahan : Koef. Volume Jumlah
NYFGbY 4 x 35 mm2 1.00 m 120.00 m 120.00 m
Peralatan Bantu 1.00 bh 120.00 bh 120.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.120 OH 120.00 = 14.40 Ls 3 hari = 4.80 oh
Tukang 0.175 OH 120.00 = 21.00 Ls 3 hari = 7.00 oh
kepala tukang 0.018 OH 120.00 = 2.10 Ls 3 hari = 0.70 oh
Mandor 0.006 OH 120.00 = 0.70 Ls 3 hari = 0.23 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Kabel Feeder dari PP -Lantai 3 ke :


Kios kelompok 1 NYY 4 x 6 mm2 100 m
Bahan : Koef. Volume Jumlah
NYY 4 x 6 mm2 1.00 m 100.00 m 100.00 m
Peralatan Bantu 1.00 bh 100.00 bh 100.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.120 OH 100.00 = 12.00 Ls 4 hari = 3.00 oh
Tukang 0.175 OH 100.00 = 17.50 Ls 4 hari = 4.38 oh
kepala tukang 0.018 OH 100.00 = 1.75 Ls 4 hari = 0.44 oh
Mandor 0.006 OH 100.00 = 0.58 Ls 4 hari = 0.15 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Kios kelompok 2 NYY 4 x 6 mm2 110 m


Bahan : Koef. Volume Jumlah
NYY 4 x 6 mm2 1.00 m 110.00 m 110.00 m
Peralatan Bantu 1.00 bh 110.00 bh 110.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.120 OH 110.00 = 13.20 Ls 4 hari = 3.30 oh
Tukang 0.175 OH 110.00 = 19.25 Ls 4 hari = 4.81 oh
kepala tukang 0.018 OH 110.00 = 1.93 Ls 4 hari = 0.48 oh
Mandor 0.006 OH 110.00 = 0.64 Ls 4 hari = 0.16 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Kios kelompok 3 NYY 4 x 6 mm2 30 m


Bahan : Koef. Volume Jumlah
NYY 4 x 6 mm2 1.00 m 30.00 m 30.00 m
Peralatan Bantu 1.00 bh 30.00 bh 30.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.120 OH 30.00 = 3.60 Ls 4 hari = 0.90 oh
Tukang 0.175 OH 30.00 = 5.25 Ls 4 hari = 1.31 oh
kepala tukang 0.018 OH 30.00 = 0.53 Ls 4 hari = 0.13 oh
Mandor 0.006 OH 30.00 = 0.18 Ls 4 hari = 0.04 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Kios kelompok 4 NYY 4 x 6 mm2 110 m


Bahan : Koef. Volume Jumlah
NYY 4 x 6 mm2 1.00 m 110.00 m 110.00 m
Peralatan Bantu 1.00 bh 110.00 bh 110.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.120 OH 110.00 = 13.20 Ls 4 hari = 3.30 oh
Tukang 0.175 OH 110.00 = 19.25 Ls 4 hari = 4.81 oh
kepala tukang 0.018 OH 110.00 = 1.93 Ls 4 hari = 0.48 oh
Mandor 0.006 OH 110.00 = 0.64 Ls 4 hari = 0.16 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Kios kelompok 5 NYY 4 x 6 mm2 80 m


Bahan : Koef. Volume Jumlah
NYY 4 x 6 mm2 1.00 m 80.00 = 80.00 m
Peralatan Bantu 1.00 ls 80.00 = 80.00 ls
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.120 OH 80.00 = 9.60 OH 4 hari = 2.40 oh
Tukang 0.175 OH 80.00 = 14.00 OH 4 hari = 3.50 oh
kepala tukang 0.018 OH 80.00 = 1.40 OH 4 hari = 0.35 oh
Mandor 0.006 OH 80.00 = 0.47 OH 4 hari = 0.12 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

PEKERJAAN KABEL TRAY


Kabel Tray 300 x 50 mm 511 m
Bahan : Koef. Volume Jumlah
Tray Cable 300x50 mm 1.00 m 511.00 m 511.00 m
Hanger 1.00 set 511.00 bh 511.00 set
Peralatan Bantu 1.00 lot 511.00 bh 511.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 511.00 = 127.75 OH 14 hari = 9.13 oh
Tukang 0.400 OH 511.00 = 204.40 OH 14 hari = 14.60 oh
kepala tukang 0.040 OH 511.00 = 20.44 OH 14 hari = 1.46 oh
Mandor 0.013 OH 511.00 = 6.81 OH 14 hari = 0.49 oh

● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 12

Kabel Tray 150 x 50 mm 511 m


Bahan : Koef. Volume Jumlah
Tray Cable 150x50 mm 1.00 m 511.00 m 511.00 m
Hanger 1.00 set 511.00 bh 511.00 set
Peralatan Bantu 1.00 lot 511.00 bh 511.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 511.00 = 127.75 OH 14 hari = 9.13 oh
Tukang 0.400 OH 511.00 = 204.40 OH 14 hari = 14.60 oh
kepala tukang 0.040 OH 511.00 = 20.44 OH 14 hari = 1.46 oh
Mandor 0.013 OH 511.00 = 6.81 OH 14 hari = 0.49 oh

● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 12

Kabel Ladder 300 x 100 mm 5 m


Bahan : Koef. Volume Jumlah
Tray Cable 300x100 mm 1.00 m 5.00 m 5.00 m
Hanger 1.00 set 5.00 bh 5.00 set
Peralatan Bantu 1.00 lot 5.00 bh 5.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 5.00 = 1.25 OH 1 hari = 1.25 oh
Tukang 0.400 OH 5.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.040 OH 5.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.013 OH 5.00 = 0.07 OH 1 hari = 0.07 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Kabel Ladder 150 x 100 mm 5 m


Bahan : Koef. Volume Jumlah
Tray Cable 150x100 mm 1.00 m 5.00 m 5.00 m
Hanger 1.00 set 5.00 bh 5.00 set
Peralatan Bantu 1.00 lot 5.00 bh 5.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 5.00 = 1.25 OH 1 hari = 1.25 oh
Tukang 0.400 OH 5.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.040 OH 5.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.013 OH 5.00 = 0.07 OH 1 hari = 0.07 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

PEKERJAAN ELEKTRIKAL
TL LED 1x10 W (V-SHAPE) 132 unit
Bahan : Koef. Volume Jumlah
Lampu TL LED 10 watt 1.00 bh 132.00 m 132.00 bh
Armature Vshape 1.00 bh 132.00 bh 132.00 bh
accessories 1.00 lot 132.00 bh 132.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.046 OH 132.00 = 6.07 OH 2 hari = 3.04 oh
Tukang 0.023 OH 132.00 = 3.04 OH 2 hari = 1.52 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Lampu LED 13 W (incl. fitting & accesories) 143 unit


Bahan : Koef. Volume Jumlah
Lampu LED 13 watt 1.00 bh 143.00 = 143.00 bh
Fitting 1.00 bh 143.00 = 143.00 bh
accessories 1.00 lot 143.00 = 143.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.046 OH 143.00 = 6.58 OH 2 hari = 3.29 oh
Tukang 0.023 OH 143.00 = 3.29 OH 2 hari = 1.64 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Lampu LED 8 W (incl. fitting & accesories) 4 unit


Bahan : Koef. Volume Jumlah
Lampu LED 8 watt 1.00 bh 4.00 = 4.00 bh
Fitting 1.00 bh 4.00 = 4.00 bh
accessories 1.00 lot 4.00 = 4.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.046 OH 4.00 = 0.18 OH 1 hari = 0.18 oh
Tukang 0.023 OH 4.00 = 0.09 OH 1 hari = 0.09 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Saklar tunggal 140 unit


Bahan : Koef. Volume Jumlah
Saklar Tunggal 1.00 bh 140.00 = 140.00 bh
Peralatan Bantu 1.00 lot 140.00 = 140.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.020 OH 140.00 = 2.80 OH 1 hari = 2.80 oh
Tukang 0.025 OH 140.00 = 3.50 OH 1 hari = 3.50 oh
kepala tukang 0.003 OH 140.00 = 0.42 OH 1 hari = 0.42 oh
Mandor 0.001 OH 140.00 = 0.14 OH 1 hari = 0.14 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Saklar Ganda 10 unit


Bahan : Koef. Volume Jumlah
Saklar Double 1.00 bh 10.00 = 10.00 bh
Peralatan Bantu 1.00 lot 10.00 = 10.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.020 OH 10.00 = 0.20 OH 1 hari = 0.20 oh
Tukang 0.025 OH 10.00 = 0.25 OH 1 hari = 0.25 oh
kepala tukang 0.003 OH 10.00 = 0.03 OH 1 hari = 0.03 oh
Mandor 0.001 OH 10.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Kotak Kontak 269 unit


Bahan : Koef. Volume Jumlah
NYM 3 x 2,5 mm2 13.00 m 269.00 = 3,497.00 m
Pipa High Impact, dia. 1/2" 13.00 m 269.00 = 3,497.00 m
Peralatan Bantu 1.00 lot 269.00 = 269.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.150 OH 269.00 = 40.35 OH 7 hari = 5.76 oh
Tukang 0.015 OH 269.00 = 4.04 OH 7 hari = 0.58 oh
Mandor 0.050 OH 269.00 = 13.45 OH 7 hari = 1.92 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Instalansi Penerangan 279 ttk


Bahan : Koef. Volume Jumlah
NYM 3 x 2,5 mm2 11.00 m 279.00 = 3,069.00 m
Pipa High Impact, dia. 1/2" 11.00 m 279.00 = 3,069.00 m
Peralatan Bantu 1.00 lot 279.00 = 279.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.150 OH 279.00 = 41.85 OH 7 hari = 5.98 oh
Tukang 0.015 OH 279.00 = 4.19 OH 7 hari = 0.60 oh
Mandor 0.050 OH 279.00 = 13.95 OH 7 hari = 1.99 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Instalansi Kotak Kontak 269 ttk


Bahan : Koef. Volume Jumlah
NYM 3 x 2,5 mm2 13.00 m 269.00 = 3,497.00 m
Pipa High Impact, dia. 1/2" 13.00 m 269.00 = 3,497.00 m
Peralatan Bantu 1.00 lot 269.00 = 269.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.150 OH 269.00 = 40.35 OH 7 hari = 5.76 oh
Tukang 0.015 OH 269.00 = 4.04 OH 7 hari = 0.58 oh
Mandor 0.050 OH 269.00 = 13.45 OH 7 hari = 1.92 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

PEKERJAAN PLUMBING
Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 70 m
Bahan : Koef. Volume Jumlah
PVC dia. 1/2” 1.00 m 70.00 = 70.00 m
Hanger & Support 0.28 lot 70.00 = 19.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 70.00 = 7.00 OH 7 hari = 1.00 oh
Tukang 0.100 OH 70.00 = 7.00 OH 7 hari = 1.00 oh
kepala tukang 0.010 OH 70.00 = 0.70 OH 7 hari = 0.10 oh
Mandor 0.005 OH 70.00 = 0.35 OH 7 hari = 0.05 oh

● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

PVC ø 3/4 inc. 85 m


Bahan : Koef. Volume Jumlah
PVC dia. 3/4” 1.00 m 85.00 = 85.00 m
Hanger & Support 0.28 lot 85.00 = 23.80 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 85.00 = 8.50 OH 7 hari = 1.21 oh
Tukang 0.100 OH 85.00 = 8.50 OH 7 hari = 1.21 oh
kepala tukang 0.010 OH 85.00 = 0.85 OH 7 hari = 0.12 oh
Mandor 0.005 OH 85.00 = 0.43 OH 1 hari = 0.43 oh

● Rencana Waktu Pelaksanaan : Minggu ke 10 s/d minggu ke 10

PVC ø 1 inc. 75 m
Bahan : Koef. Volume Jumlah
PVC dia. 1” 1.00 m 75.00 = 75.00 m
Hanger & Support 0.28 lot 75.00 = 21.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 75.00 = 7.50 OH 7 hari = 1.07 oh
Tukang 0.100 OH 75.00 = 7.50 OH 7 hari = 1.07 oh
kepala tukang 0.010 OH 75.00 = 0.75 OH 7 hari = 0.11 oh
Mandor 0.005 OH 75.00 = 0.38 OH 1 hari = 0.38 oh
● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

PVC ø 1 1/2 inc. 20 m


Bahan : Koef. Volume Jumlah
PVC dia. 1 1/2” 1.00 m 20.00 = 20.00 m
Hanger & Support 0.28 lot 20.00 = 5.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
Tukang 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.010 OH 20.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.005 OH 20.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

PVC ø 2 inc. 35 m
Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 35.00 = 35.00 m
Hanger & Support 0.28 lot 35.00 = 9.80 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 35.00 = 3.50 OH 1 hari = 3.50 oh
Tukang 0.100 OH 35.00 = 3.50 OH 1 hari = 3.50 oh
kepala tukang 0.010 OH 35.00 = 0.35 OH 1 hari = 0.35 oh
Mandor 0.005 OH 35.00 = 0.18 OH 1 hari = 0.18 oh

● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

PVC (Riser) ø 2 inc. 5 m


Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 5.00 = 5.00 m
Hanger & Support 0.28 lot 5.00 = 1.40 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
Tukang 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
kepala tukang 0.010 OH 5.00 = 0.05 OH 1 hari = 0.05 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 11 s/d minggu ke 11

Valve (Class 125 psi) & Accessories


Gate Valve ø 2 inc. 1 unit
Bahan : Koef. Volume Jumlah
Gate Valve dia. 2” 1.00 bh 1.00 = 1.00 bh
Hanger & Support 0.28 lot 1.00 = 0.28 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
Tukang 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
kepala tukang 0.010 OH 1.00 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.005 OH 1.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Gate Valve ø 3/4 inc. 42 unit


Bahan : Koef. Volume Jumlah
Gate Valve dia. 3/4” 1.00 bh 42.00 = 42.00 bh
Hanger & Support 0.28 lot 42.00 = 11.76 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 42.00 = 4.20 OH 1 hari = 4.20 oh
Tukang 0.100 OH 42.00 = 4.20 OH 1 hari = 4.20 oh
kepala tukang 0.010 OH 42.00 = 0.42 OH 1 hari = 0.42 oh
Mandor 0.005 OH 42.00 = 0.21 OH 1 hari = 0.21 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Water Meter ø 3/4 inc. 42 unit


Bahan : Koef. Volume Jumlah
Water Meter 1.00 bh 42.00 = 42.00 bh
Hanger & Support 0.28 lot 42.00 = 11.76 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 42.00 = 4.20 OH 1 hari = 4.20 oh
Tukang 0.100 OH 42.00 = 4.20 OH 1 hari = 4.20 oh
kepala tukang 0.010 OH 42.00 = 0.42 OH 1 hari = 0.42 oh
Mandor 0.005 OH 42.00 = 0.21 OH 1 hari = 0.21 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Pipa air kotor (PVC class 10 kg/cm2, incl. accessories)


PVC ø 2 inc. 75 m
PVC dia. 2” 1.00 m 75.00 = 75.00 m
Hanger & Support 0.28 lot 75.00 = 21.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 75.00 = 7.50 OH 1 hari = 7.50 oh
Tukang 0.100 OH 75.00 = 7.50 OH 1 hari = 7.50 oh
kepala tukang 0.010 OH 75.00 = 0.75 OH 1 hari = 0.75 oh
Mandor 0.005 OH 75.00 = 0.38 OH 1 hari = 0.38 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

PVC ø 3 inc. 145 m


Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 145.00 = 145.00 m
Hanger & Support 0.28 lot 145.00 = 40.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 145.00 = 14.50 OH 1 hari = 14.50 oh
Tukang 0.100 OH 145.00 = 14.50 OH 1 hari = 14.50 oh
kepala tukang 0.010 OH 145.00 = 1.45 OH 1 hari = 1.45 oh
Mandor 0.005 OH 145.00 = 0.73 OH 1 hari = 0.73 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

PVC ø 4 inc. 75 m
Bahan : Koef. Volume Jumlah
PVC dia. 4” 1.00 m 75.00 = 75.00 m
Hanger & Support 0.28 lot 75.00 = 21.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 75.00 = 7.50 OH 1 hari = 7.50 oh
Tukang 0.100 OH 75.00 = 7.50 OH 1 hari = 7.50 oh
kepala tukang 0.010 OH 75.00 = 0.75 OH 1 hari = 0.75 oh
Mandor 0.005 OH 75.00 = 0.38 OH 1 hari = 0.38 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

PVC (Riser) ø 4 inc. 20 m


PVC (Riser) ø 4 inc. 20 m
Bahan : Koef. Volume Jumlah
PVC dia. 4” 1.00 m 20.00 = 20.00 m
Hanger & Support 0.28 lot 20.00 = 5.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
Tukang 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.010 OH 20.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.005 OH 20.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

Floor Drain 3 unit


Pipa vent (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1 1/4 inc. 20 m
Bahan : Koef. Volume Jumlah
PVC dia. 1 1/4” 1.00 m 20.00 = 20.00 m
Hanger & Support 0.28 lot 20.00 = 5.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
Tukang 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.010 OH 20.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.005 OH 20.00 = 0.10 OH 1 hari = 0.10 oh
● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Clean Out ø 2 inc 2 unit


Bahan : Koef. Volume Jumlah
Clean Out 2" 1.00 unit 2.00 = 2.00 unit
Alat Bantu 0.35 set 2.00 = 0.70 set
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 2.00 = 0.20 OH 1 hari = 0.20 oh
Tukang 0.100 OH 2.00 = 0.20 OH 1 hari = 0.20 oh
kepala tukang 0.010 OH 2.00 = 0.02 OH 1 hari = 0.02 oh
Mandor 0.005 OH 2.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Clean Out ø 4 inc 2 unit

Clean Out ø 4 inc 2 unit


Bahan : Koef. Volume Jumlah
Clean Out 4" 1.00 unit 2.00 = 2.00 unit
Alat Bantu 0.35 set 2.00 = 0.70 set
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 2.00 = 0.20 OH 1 hari = 0.20 oh
Tukang 0.100 OH 2.00 = 0.20 OH 1 hari = 0.20 oh
kepala tukang 0.010 OH 2.00 = 0.02 OH 1 hari = 0.02 oh
Mandor 0.005 OH 2.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Pipa vent (PVC class 10 kg/cm2, incl. accessories)


PVC ø 1 1/4 inc. 20 m
Bahan : Koef. Volume Jumlah
PVC dia. 1 1/4” 1.00 m 20.00 = 20.00 m
Hanger & Support 0.28 lot 20.00 = 5.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
Tukang 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.010 OH 20.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.005 OH 20.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

PVC ø 2 inc. 5 m
Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 5.00 = 5.00 m
Hanger & Support 0.28 lot 5.00 = 1.40 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
Tukang 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
kepala tukang 0.010 OH 5.00 = 0.05 OH 1 hari = 0.05 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

PVC (Riser) ø 3 inc. 5 m


Bahan : Koef. Volume Jumlah
PVC dia. 3” 1.00 m 5.00 = 5.00 m
Hanger & Support 0.28 lot 5.00 = 1.40 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
Tukang 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
kepala tukang 0.010 OH 5.00 = 0.05 OH 1 hari = 0.05 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

PEKERJAAN EXHAUST FAN


EXHAUST FAN INCL.INSTALASI & Kotak Kontak
- Capacity : 150 CMH , type Ceiling, incl. ducting & grille 2 unit TAHAP BERIKUTNYA
PEKERJAAN PENCEGAH KEBAKARAN
Hydrant Box (Indoor) 3 set TAHAP BERIKUTNYA
Fire extinguiser 3 set TAHAP BERIKUTNYA

Pipa Hydrant (BSP Sch 40, incl. accessories)


BSP ø 1 1/2 inc 3 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 1 1/2” 1.00 m3 3.00 = 3.00 m3
Support & Accesories 0.10 lot 3.00 = 0.30 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 3.00 = 0.32 OH 1 hari = 0.32 oh
Tukang 0.180 OH 3.00 = 0.54 OH 1 hari = 0.54 oh
kepala tukang 0.018 OH 3.00 = 0.05 OH 1 hari = 0.05 oh
Mandor 0.005 OH 3.00 = 0.02 OH 1 hari = 0.02 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

BSP ø 2 1/2 inc 60 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2 1/2” 1.00 m3 0.00 = - m3
Support & Accesories 0.10 lot 0.00 = - lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 0.00 = - OH 1 hari = - oh
Tukang 0.180 OH 0.00 = - OH 1 hari = - oh
kepala tukang 0.018 OH 0.00 = - OH 1 hari = - oh
Mandor 0.005 OH 0.00 = - OH 1 hari = - oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

BSP ø 4 inc 5 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 4” 1.00 m3 5.00 = 5.00 m3
Support & Accesories 0.10 lot 5.00 = 0.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 5.00 = 0.54 OH 1 hari = 0.54 oh
Tukang 0.180 OH 5.00 = 0.90 OH 1 hari = 0.90 oh
kepala tukang 0.018 OH 5.00 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

BSP (riser) ø 6 inc 5 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 6” 1.00 m3 5.00 = 5.00 m3
Support & Accesories 0.10 lot 5.00 = 0.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 5.00 = 0.54 OH 1 hari = 0.54 oh
Tukang 0.180 OH 5.00 = 0.90 OH 1 hari = 0.90 oh
kepala tukang 0.018 OH 5.00 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 150 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 1” 1.00 m3 150.00 = 150.00 m3
Support & Accesories 0.10 lot 150.00 = 15.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 150.00 = 16.20 OH 1 hari = 16.20 oh
Tukang 0.180 OH 150.00 = 27.00 OH 1 hari = 27.00 oh
kepala tukang 0.018 OH 150.00 = 2.70 OH 1 hari = 2.70 oh
Mandor 0.005 OH 150.00 = 0.81 OH 1 hari = 0.81 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

BSP ø 1 1/4 inc 35 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 1 1/4” 1.00 m3 0.00 = - m3
Support & Accesories 0.10 lot 0.00 = - lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 0.00 = - OH 1 hari = - oh
Tukang 0.180 OH 0.00 = - OH 1 hari = - oh
kepala tukang 0.018 OH 0.00 = - OH 1 hari = - oh
Mandor 0.005 OH 0.00 = - OH 1 hari = - oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

BSP ø 1 1/2 inc 20 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 1 1/2” 1.00 m3 20.00 = 20.00 m3
Support & Accesories 0.10 lot 20.00 = 2.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 20.00 = 2.16 OH 1 hari = 2.16 oh
Tukang 0.180 OH 20.00 = 3.60 OH 1 hari = 3.60 oh
kepala tukang 0.018 OH 20.00 = 0.36 OH 1 hari = 0.36 oh
Mandor 0.005 OH 20.00 = 0.11 OH 1 hari = 0.11 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

BSP ø 2 inc 65 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2” 1.00 m3 65.00 = 65.00 m3
Support & Accesories 0.10 lot 65.00 = 6.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 65.00 = 7.02 OH 1 hari = 7.02 oh
Tukang 0.180 OH 65.00 = 11.70 OH 1 hari = 11.70 oh
kepala tukang 0.018 OH 65.00 = 1.17 OH 1 hari = 1.17 oh
Mandor 0.005 OH 65.00 = 0.35 OH 1 hari = 0.35 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

BSP ø 2 1/2 inc 30 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2 1/2 ” 1.00 m3 30.00 = 30.00 m3
Support & Accesories 0.10 lot 30.00 = 3.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 30.00 = 3.24 OH 1 hari = 3.24 oh
Tukang 0.180 OH 30.00 = 5.40 OH 1 hari = 5.40 oh
kepala tukang 0.018 OH 30.00 = 0.54 OH 1 hari = 0.54 oh
Mandor 0.005 OH 30.00 = 0.16 OH 1 hari = 0.16 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

BSP ø 3 inc 35 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 3” 1.00 m3 35.00 = 35.00 m3
Support & Accesories 0.10 lot 35.00 = 3.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 35.00 = 3.78 OH 1 hari = 3.78 oh
Tukang 0.180 OH 35.00 = 6.30 OH 1 hari = 6.30 oh
kepala tukang 0.018 OH 35.00 = 0.63 OH 1 hari = 0.63 oh
Mandor 0.005 OH 35.00 = 0.19 OH 1 hari = 0.19 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

BSP ø 4 inc 20 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 4” 1.00 m3 20.00 = 20.00 m3
Support & Accesories 0.10 lot 20.00 = 2.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 20.00 = 2.16 OH 1 hari = 2.16 oh
Tukang 0.180 OH 20.00 = 3.60 OH 1 hari = 3.60 oh
kepala tukang 0.018 OH 20.00 = 0.36 OH 1 hari = 0.36 oh
Mandor 0.005 OH 20.00 = 0.11 OH 1 hari = 0.11 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

BSP ø 6 inc 10 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 6” 1.00 m3 10.00 = 10.00 m3
Support & Accesories 0.10 lot 10.00 = 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 10.00 = 1.08 OH 1 hari = 1.08 oh
Tukang 0.180 OH 10.00 = 1.80 OH 1 hari = 1.80 oh
kepala tukang 0.018 OH 10.00 = 0.18 OH 1 hari = 0.18 oh
Mandor 0.005 OH 10.00 = 0.05 OH 1 hari = 0.05 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

BSP (riser) ø 6 inc 5 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 6” 1.00 m3 5.00 = 5.00 m3
Support & Accesories 0.10 lot 5.00 = 0.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 5.00 = 0.54 OH 1 hari = 0.54 oh
Tukang 0.180 OH 5.00 = 0.90 OH 1 hari = 0.90 oh
kepala tukang 0.018 OH 5.00 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Drain Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 85 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 1” 1.00 m3 85.00 = 85.00 m3
Support & Accesories 0.10 lot 85.00 = 8.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 85.00 = 9.18 OH 1 hari = 9.18 oh
Tukang 0.180 OH 85.00 = 15.30 OH 1 hari = 15.30 oh
kepala tukang 0.018 OH 85.00 = 1.53 OH 1 hari = 1.53 oh
Mandor 0.005 OH 85.00 = 0.46 OH 1 hari = 0.46 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

BSP (riser drain) ø 2 inc 5 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2” 1.00 m3 5.00 = 5.00 m3
Support & Accesories 0.10 lot 5.00 = 0.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 5.00 = 0.54 OH 1 hari = 0.54 oh
Tukang 0.180 OH 5.00 = 0.90 OH 1 hari = 0.90 oh
kepala tukang 0.018 OH 5.00 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Valve (Class 20 K) & Accessories


Gate Valve ø 1 inc 1 unit
Bahan : Koef. Volume Jumlah
Gate Valve dia. 1” 1.00 bh 1.00 = 1.00 bh
Hanger & Support 0.28 lot 1.00 = 0.28 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
Tukang 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
kepala tukang 0.010 OH 1.00 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.005 OH 1.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Gate Valve ø 4 inc 1 unit


Bahan : Koef. Volume Jumlah
Gate Valve dia. 1” 1.00 bh 1.00 = 1.00 bh
Hanger & Support 0.28 lot 1.00 = 0.28 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
Tukang 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
kepala tukang 0.010 OH 1.00 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.005 OH 1.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Pressure Reducing Valve ø 6 inc 1 unit


Bahan : Koef. Volume Jumlah
Pressure Reducing Valve 1.00 bh 1.00 m 1.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Flow switch 1 unit


Bahan : Koef. Volume Jumlah
Flow switch 1.00 bh 1.00 m 1.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Head sprinkler (pendent type) 122 unit


Bahan : Koef. Volume Jumlah
Head sprinkler (pendent type) 1.00 bh 122.00 m 122.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 122.00 = 12.20 OH 1 hari = 12.20 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Branch control valve, terdiri dari 1 set


Gate Valve ø 6 inc
Gate Valve ø 1 inc
Flow switch
Sight glass
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

PEKERJAAN SOUND SYSTEM BY OWNEER

PEKERJAAN FIRE ALARM TAHAP BERIKUTNYA

PEKERJAAN CCTV BY OWNEER

IV PEKERJAAN LANTAI DAK BETON

PEKERJAAN PLUMBING
Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1 inc. 5 m
Bahan : Koef. Volume Jumlah
PVC dia. 1” 1.00 m 5.00 = 5.00 m
Hanger & Support 0.28 lot 5.00 = 1.40 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
Tukang 0.100 OH 5.00 = 0.50 OH 1 hari = 0.50 oh
kepala tukang 0.010 OH 5.00 = 0.05 OH 1 hari = 0.05 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

PVC ø 2 inc. 20 m
Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 20.00 = 20.00 m
Hanger & Support 0.28 lot 20.00 = 5.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
Tukang 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.010 OH 20.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.005 OH 20.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Valve (Class 125 psi) & Accessories


Gate Valve ø 1 inc. 2 unit
Bahan : Koef. Volume Jumlah
Gate Valve dia. 2” 1.00 bh 2.00 = 2.00 bh
Hanger & Support 0.28 lot 2.00 = 0.56 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 2.00 = 0.20 OH 1 hari = 0.20 oh
Tukang 0.100 OH 2.00 = 0.20 OH 1 hari = 0.20 oh
kepala tukang 0.010 OH 2.00 = 0.02 OH 1 hari = 0.02 oh
Mandor 0.005 OH 2.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Gate Valve ø 2 inc. 3 unit


Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 3.00 = 3.00 m
Hanger & Support 0.28 lot 3.00 = 0.84 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 3.00 = 0.30 OH 1 hari = 0.30 oh
Tukang 0.100 OH 3.00 = 0.30 OH 1 hari = 0.30 oh
kepala tukang 0.010 OH 3.00 = 0.03 OH 1 hari = 0.03 oh
Mandor 0.005 OH 3.00 = 0.02 OH 1 hari = 0.02 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Pipa air hujan (PVC class 10 kg/cm2, incl. accessories)


Roof Drain 18 unit
Bahan : Koef. Volume Jumlah
Roof drain Sts Ø 3" 1.000 BH 18.00 = 18.00 BH
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.010 OH 18.00 = 0.18 OH 1 hari = 0.18 oh
Tukang 0.100 OH 18.00 = 1.80 OH 1 hari = 1.80 oh
Kepala tukang 0.010 OH 18.00 = 0.18 OH 1 hari = 0.18 oh
Mandor 0.005 OH 18.00 = 0.09 OH 1 hari = 0.09 oh
● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

PVC ø 4 inc. 50 m
Bahan : Koef. Volume Jumlah
PVC dia. 4” 1.00 m 50.00 = 50.00 m
Hanger & Support 0.28 lot 50.00 = 14.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 50.00 = 5.00 OH 1 hari = 5.00 oh
Tukang 0.100 OH 50.00 = 5.00 OH 1 hari = 5.00 oh
kepala tukang 0.010 OH 50.00 = 0.50 OH 1 hari = 0.50 oh
Mandor 0.005 OH 50.00 = 0.25 OH 1 hari = 0.25 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

PVC ø 6 inc. 30 m
Bahan : Koef. Volume Jumlah
PVC dia. 6” 1.00 m 30.00 = 30.00 m
Hanger & Support 0.28 lot 30.00 = 8.40 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 30.00 = 3.00 OH 1 hari = 3.00 oh
Tukang 0.100 OH 30.00 = 3.00 OH 1 hari = 3.00 oh
kepala tukang 0.010 OH 30.00 = 0.30 OH 1 hari = 0.30 oh
Mandor 0.005 OH 30.00 = 0.15 OH 1 hari = 0.15 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14


Roof TANK 2x4m3 1 set
Bahan : Koef. Volume Jumlah
Roof TANK 2x4m3 1.00 BH 1.00 = 1.00 BH
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
Tukang 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
kepala tukang 0.010 OH 1.00 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.005 OH 1.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

PEKERJAAN PENANGKAL PETIR & GROUNDING


Penangkal petir jenis Elekro statis (Radius protection 100 m) 1 set
Bahan : Koef. Volume Jumlah
Penangkal petir jenis Elekro statis (Radius protection 1.00 BH 1.00 = 1.00 BH
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
JASA PASANG 1.000 LS 1.00 = 1.00 OH 1 hari = 0.10 oh
● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

incl. Cable BC, support & accessories


Grounding penangkal petir incl. cable 2 ttk
Bahan : Koef. Volume Jumlah
Grounding penangkal petir incl. cable 1.00 BH 1.00 = 1.00 BH
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
JASA PASANG 1.000 LS 1.00 = 1.00 OH 1 hari = 0.10 oh
● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Grounding panel incl. cable 2 ttk


Bahan : Koef. Volume Jumlah
Grounding panel incl. cable 1.00 BH 1.00 = 1.00 BH
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
JASA PASANG 1.000 LS 1.00 = 1.00 OH 1 hari = 0.10 oh
● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Grounding Genset incl. cable 1 ttk


Bahan : Koef. Volume Jumlah
Grounding Genset incl. cable 1.00 BH 1.00 = 1.00 BH
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
JASA PASANG 1.000 LS 1.00 = 1.00 OH 1 hari = 0.10 oh
● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Grounding Trafo incl. cable 1 ttk


Bahan : Koef. Volume Jumlah
Grounding Trafo incl. cable 1.00 BH 1.00 = 1.00 BH
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
JASA PASANG 1.000 LS 1.00 = 1.00 OH 1 hari = 0.10 oh
● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 17

Grounding PABX 1 ttk


Bahan : Koef. Volume Jumlah
Grounding PABX 1.00 BH 1.00 = 1.00 BH
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
JASA PASANG 1.000 LS 1.00 = 1.00 OH 1 hari = 0.10 oh
● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 17

BANGUNAN SAMPING

I LANTAI BASEMENT TAHAP BERIKUTNYA

I LANTAI I

PEKERJAAN PANEL
Panel PP - lantai 2 (Penunjang) 1 unit
Bahan : Koef. Volume Jumlah
MCB 63 A 3PH 1.00 bh 1.00 = 1.00 bh
MCB 16 A 3 PH 2.00 bh 1.00 = 1.00 bh
MCB 10 A 1 PH 3.00 bh 1.00 = 1.00 bh
Pilot Lamp 3.00 set 1.00 = 1.00 set
Fuse Pilot Lamp 3.00 set 1.00 = 1.00 set
Wiring & Busbar 1.00 set 1.00 = 1.00 set
Panel Kosong uk. 70 x 90 x 30 cm 1.00 set 1.00 = 1.00 set
Ongkos Pasang & stel 1.00 lot 1.00 = 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
JASA PASANG 1.000 LS 1.00 = 1.00 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

kWh Meter 1 PH (incl. Box MCB & Accesories) 41 unit


Bahan : Koef. Volume Jumlah
KWH Meter 1 PH 1.00 bh 41.00 = 1.00 bh
MCB Box 2.00 bh 41.00 = 1.00 bh
MCB 4 A 1 PH 3.00 bh 41.00 = 1.00 bh
MCB 2 A 1 PH 3.00 set 41.00 = 1.00 set
NYM Standart 3 x 2,5 mm2 3.00 set 41.00 = 1.00 set
Peralatan Bantu 1.00 set 41.00 = 1.00 set
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
JASA PASANG 1.000 LS 41.00 = 1.00 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

PEKERJAAN INSTALASI KABEL FEEDER


Kabel Feeder dari LVMDP ke :
Panel PP - lantai 2 (Penunjang) NYFGbY 4 x 25 mm2 120 m
Bahan : Koef. Volume Jumlah
NYFGbY 4 x 25 mm2 1.00 m 120.00 = 120.00 m
Peralatan Bantu 1.00 lot 120.00 = 120.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.120 OH 120.00 = 14.40 OH 1 hari = 14.40 oh
Tukang 0.175 OH 120.00 = 21.00 OH 1 hari = 21.00 oh
kepala tukang 0.018 OH 120.00 = 2.10 OH 1 hari = 2.10 oh
Mandor 0.006 OH 120.00 = 0.70 OH 1 hari = 0.70 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Kabel Feeder dari PP - lantai 2 (Penunjang) ke :


Kios kelompok 1 NYY 4 x 4 mm2 35 m
Bahan : Koef. Volume Jumlah
NYY 4 x 4 mm2 1.00 m 35.00 = 35.00 m
Peralatan Bantu 1.00 lot 35.00 = 35.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.030 OH 35.00 = 1.05 OH 1 hari = 1.05 oh
Tukang 0.050 OH 35.00 = 1.75 OH 1 hari = 1.75 oh
kepala tukang 0.005 OH 35.00 = 0.18 OH 1 hari = 0.18 oh
Mandor 0.002 OH 35.00 = 0.06 OH 1 hari = 0.06 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Kios kelompok 2 NYY 4 x 4 mm2 45 m


Bahan : Koef. Volume Jumlah
NYY 4 x 4 mm2 1.00 m 45.00 = 45.00 m
Peralatan Bantu 1.00 lot 45.00 = 45.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.030 OH 45.00 = 1.35 OH 1 hari = 1.35 oh
Tukang 0.050 OH 45.00 = 2.25 OH 1 hari = 2.25 oh
kepala tukang 0.005 OH 45.00 = 0.23 OH 1 hari = 0.23 oh
Mandor 0.002 OH 45.00 = 0.08 OH 1 hari = 0.08 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

PEKERJAAN KABEL TRAY


Kabel Tray 300 x 50 mm 108 m
Bahan : Koef. Volume Jumlah
Tray Cable 300x50 mm 1.00 m 108.00 m 108.00 m
Hanger 1.00 set 108.00 bh 108.00 set
Peralatan Bantu 1.00 lot 108.00 bh 108.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 108.00 = 27.00 OH 14 hari = 1.93 oh
Tukang 0.400 OH 108.00 = 43.20 OH 14 hari = 3.09 oh
kepala tukang 0.040 OH 108.00 = 4.32 OH 14 hari = 0.31 oh
Mandor 0.013 OH 108.00 = 1.44 OH 14 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Kabel Tray 150 x 50 mm 108 m


Bahan : Koef. Volume Jumlah
Tray Cable 150x50 mm 1.00 m 108.00 m 108.00 m
Hanger 1.00 set 108.00 bh 108.00 set
Peralatan Bantu 1.00 lot 108.00 bh 108.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 108.00 = 27.00 OH 14 hari = 1.93 oh
Tukang 0.400 OH 108.00 = 43.20 OH 14 hari = 3.09 oh
kepala tukang 0.040 OH 108.00 = 4.32 OH 14 hari = 0.31 oh
Mandor 0.013 OH 108.00 = 1.44 OH 14 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Kabel Ladder 300 x 100 mm 5 m


Bahan : Koef. Volume Jumlah
Tray Cable 300x100 mm 1.00 m 5.00 m 5.00 m
Hanger 1.00 set 5.00 bh 5.00 set
Peralatan Bantu 1.00 lot 5.00 bh 5.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 5.00 = 1.25 OH 1 hari = 1.25 oh
Tukang 0.400 OH 5.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.040 OH 5.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.013 OH 5.00 = 0.07 OH 1 hari = 0.07 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Kabel Ladder 150 x 100 mm 5 m


Bahan : Koef. Volume Jumlah
Tray Cable 150x100 mm 1.00 m 5.00 m 5.00 m
Hanger 1.00 set 5.00 bh 5.00 set
Peralatan Bantu 1.00 lot 5.00 bh 5.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 5.00 = 1.25 OH 1 hari = 1.25 oh
Tukang 0.400 OH 5.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.040 OH 5.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.013 OH 5.00 = 0.07 OH 1 hari = 0.07 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

PEKERJAAN ELEKTRIKAL
TL LED 1x10 W (V-SHAPE) 33 unit
Bahan : Koef. Volume Jumlah
Lampu TL LED 10 watt 1.00 bh 33.00 m 33.00 bh
Armature Vshape 1.00 bh 33.00 bh 33.00 bh
accessories 1.00 lot 33.00 bh 33.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.046 OH 33.00 = 1.52 OH 2 hari = 0.76 oh
Tukang 0.023 OH 33.00 = 0.76 OH 2 hari = 0.38 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Lampu LED 13 W (incl. fitting & accesories) 41 unit


Bahan : Koef. Volume Jumlah
Lampu LED 13 watt 1.00 bh 41.00 m 41.00 bh
Fitting 1.00 bh 41.00 bh 41.00 bh
accessories 1.00 lot 41.00 bh 41.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.046 OH 41.00 = 1.89 OH 2 hari = 0.94 oh
Tukang 0.023 OH 41.00 = 0.94 OH 2 hari = 0.47 oh
● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Saklar tunggal 41 unit


Bahan : Koef. Volume Jumlah
Saklar Tunggal 1.00 bh 41.00 m 41.00 bh
Peralatan Bantu 1.00 lot 41.00 bh 41.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.020 OH 41.00 = 0.82 OH 1 hari = 0.82 oh
Tukang 0.025 OH 41.00 = 1.03 OH 1 hari = 1.03 oh
kepala tukang 0.003 OH 41.00 = 0.12 OH 1 hari = 0.12 oh
Mandor 0.001 OH 41.00 = 0.04 OH 1 hari = 0.04 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Saklar Ganda 2 unit


Bahan : Koef. Volume Jumlah
Saklar Double 1.00 bh 2.00 m 2.00 bh
Peralatan Bantu 1.00 lot 2.00 bh 2.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.020 OH 2.00 = 0.04 OH 1 hari = 0.04 oh
Tukang 0.025 OH 2.00 = 0.05 OH 1 hari = 0.05 oh
kepala tukang 0.003 OH 2.00 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.001 OH 2.00 = 0.00 OH 1 hari = 0.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Kotak Kontak 82 unit


Bahan : Koef. Volume Jumlah
NYM 3 x 2,5 mm2 13.00 m 82.00 m 1,066.00 m
Pipa High Impact, dia. 1/2" 13.00 m 82.00 bh 1,066.00 m
Peralatan Bantu 1.00 lot 82.00 bh 82.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.150 OH 82.00 = 12.30 OH 1 hari = 12.30 oh
Tukang 0.015 OH 82.00 = 1.23 OH 1 hari = 1.23 oh
Mandor 0.050 OH 82.00 = 4.10 OH 1 hari = 4.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Instalansi Penerangan 74 ttk


Bahan : Koef. Volume Jumlah
NYM 3 x 2,5 mm2 11.00 m 74.00 m 814.00 m
Pipa High Impact, dia. 1/2" 11.00 m 74.00 bh 814.00 m
Peralatan Bantu 1.00 lot 74.00 bh 74.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.150 OH 74.00 = 11.10 OH 1 hari = 11.10 oh
Tukang 0.015 OH 74.00 = 1.11 OH 1 hari = 1.11 oh
Mandor 0.050 OH 74.00 = 3.70 OH 1 hari = 3.70 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Instalansi Kotak Kontak 82 ttk


Bahan : Koef. Volume Jumlah
NYM 3 x 2,5 mm2 13.00 m 82.00 m 1,066.00 m
Pipa High Impact, dia. 1/2" 13.00 m 82.00 bh 1,066.00 m
Peralatan Bantu 1.00 lot 82.00 bh 82.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.150 OH 82.00 = 12.30 OH 1 hari = 12.30 oh
Tukang 0.015 OH 82.00 = 1.23 OH 1 hari = 1.23 oh
Mandor 0.050 OH 82.00 = 4.10 OH 1 hari = 4.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

PEKERJAAN PLUMBING
Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 1/2 inc. 10 m
PVC ø 1/2 inc. 70.00 m
Bahan : Koef. Volume Jumlah
PVC dia. 1/2” 1.00 m 70.00 m 70.00 m
Hanger & Support 0.28 lot 70.00 bh 19.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 70.00 = 7.00 OH 1 hari = 7.00 oh
Tukang 0.100 OH 70.00 = 7.00 OH 1 hari = 7.00 oh
kepala tukang 0.010 OH 70.00 = 0.70 OH 1 hari = 0.70 oh
Mandor 0.005 OH 70.00 = 0.35 OH 1 hari = 0.35 oh

● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

PVC ø 3/4 inc. 10 m


Bahan : Koef. Volume Jumlah
PVC dia. 3/4” 1.00 m 10.00 m 10.00 m
Hanger & Support 0.28 lot 10.00 bh 2.80 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 10.00 = 1.00 OH 1 hari = 1.00 oh
Tukang 0.100 OH 10.00 = 1.00 OH 1 hari = 1.00 oh
kepala tukang 0.010 OH 10.00 = 0.10 OH 1 hari = 0.10 oh
Mandor 0.005 OH 10.00 = 0.05 OH 1 hari = 0.05 oh

● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

PVC ø 1 inc. 45 m
Bahan : Koef. Volume Jumlah
PVC dia. 1” 1.00 m 45.00 m 45.00 m
Hanger & Support 0.28 lot 45.00 bh 12.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 45.00 = 4.50 OH 1 hari = 4.50 oh
Tukang 0.100 OH 45.00 = 4.50 OH 1 hari = 4.50 oh
kepala tukang 0.010 OH 45.00 = 0.45 OH 1 hari = 0.45 oh
Mandor 0.005 OH 45.00 = 0.23 OH 1 hari = 0.23 oh

● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

Valve (Class 125 psi) & Accessories


Gate Valve ø 1 inc. 1 unit
Bahan : Koef. Volume Jumlah
Gate Valve dia. 1” 1.00 bh 1.00 m 1.00 bh
Hanger & Support 0.28 lot 1.00 bh 0.28 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
Tukang 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
kepala tukang 0.010 OH 1.00 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.005 OH 1.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

Gate Valve ø 3/4 inc. 10 unit


Bahan : Koef. Volume Jumlah
Gate Valve dia. 3/4” 1.00 bh 10.00 m 10.00 bh
Hanger & Support 0.28 lot 10.00 bh 2.80 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 10.00 = 1.00 OH 1 hari = 1.00 oh
Tukang 0.100 OH 10.00 = 1.00 OH 1 hari = 1.00 oh
kepala tukang 0.010 OH 10.00 = 0.10 OH 1 hari = 0.10 oh
Mandor 0.005 OH 10.00 = 0.05 OH 1 hari = 0.05 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

Water Meter ø 3/4 inc. 10 unit


Bahan : Koef. Volume Jumlah
Water Meter 1.00 bh 10.00 m 10.00 bh
Hanger & Support 0.28 lot 10.00 bh 2.80 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 10.00 = 1.00 OH 1 hari = 1.00 oh
Tukang 0.100 OH 10.00 = 1.00 OH 1 hari = 1.00 oh
kepala tukang 0.010 OH 10.00 = 0.10 OH 1 hari = 0.10 oh
Mandor 0.005 OH 10.00 = 0.05 OH 1 hari = 0.05 oh
● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

Pipa air kotor (PVC class 10 kg/cm2, incl. accessories)


PVC ø 2 inc. 10 m
Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 10.00 m 10.00 m
Hanger & Support 0.28 lot 10.00 bh 2.80 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 10.00 = 1.00 OH 1 hari = 1.00 oh
Tukang 0.100 OH 10.00 = 1.00 OH 1 hari = 1.00 oh
kepala tukang 0.010 OH 10.00 = 0.10 OH 1 hari = 0.10 oh
Mandor 0.005 OH 10.00 = 0.05 OH 1 hari = 0.05 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

PVC ø 3 inc. 17 m
Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 17.00 m 17.00 m
Hanger & Support 0.28 lot 17.00 bh 4.76 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 17.00 = 1.70 OH 1 hari = 1.70 oh
Tukang 0.100 OH 17.00 = 1.70 OH 1 hari = 1.70 oh
kepala tukang 0.010 OH 17.00 = 0.17 OH 1 hari = 0.17 oh
Mandor 0.005 OH 17.00 = 0.09 OH 1 hari = 0.09 oh

● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

PVC ø 4 inc. 20 m
Bahan : Koef. Volume Jumlah
PVC dia. 4” 1.00 m 20.00 m 20.00 m
Hanger & Support 0.28 lot 20.00 bh 5.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
Tukang 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.010 OH 20.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.005 OH 20.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

PVC (Riser) ø 4 inc. 10 m


Bahan : Koef. Volume Jumlah
PVC dia. 4” 1.00 m 10.00 m 10.00 m
Hanger & Support 0.28 lot 10.00 bh 2.80 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 10.00 = 1.00 OH 1 hari = 1.00 oh
Tukang 0.100 OH 10.00 = 1.00 OH 1 hari = 1.00 oh
kepala tukang 0.010 OH 10.00 = 0.10 OH 1 hari = 0.10 oh
Mandor 0.005 OH 10.00 = 0.05 OH 1 hari = 0.05 oh

● Rencana Waktu Pelaksanaan : Minggu ke 6 s/d minggu ke 6

PEKERJAAN PENCEGAH KEBAKARAN


Hydrant Box (Indoor) 1 set
Material : Steel, t 1,2 mm
Dimensi : (1250 x 750 x 180) mm
House Rack : 1,5 inc
Fire House : 40 mm x 30 m
Hydrant Nozzle : 1,5 inc
Hydrant Valve : 1,5 inc
Hydrant Valve : 2,5 inc
Alarm bel
Manual push button, jack telepon
Indicator lamp
Bahan : Koef. Volume Jumlah
Indoor Hydrant Box 1.00 m 1.00 m 1.00 m
Support & Accesories 0.28 lot 1.00 bh 0.28 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
Tukang 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
kepala tukang 0.010 OH 1.00 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.005 OH 1.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Fire extinguiser TAHAP BERIKUTNYA 3 set

Pipa Hydrant (BSP Sch 40, incl. accessories)


BSP ø 1 1/2 inc 1 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 1 1/2” 1.00 m3 1.00 m 1.00 m3
Support & Accesories 0.10 lot 1.00 bh 0.10 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 1.00 = 0.11 OH 1 hari = 0.11 oh
Tukang 0.180 OH 1.00 = 0.18 OH 1 hari = 0.18 oh
kepala tukang 0.018 OH 1.00 = 0.02 OH 1 hari = 0.02 oh
Mandor 0.005 OH 1.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

BSP ø 2 1/2 inc 20 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2 1/2” 1.00 m3 20.00 m 20.00 m3
Support & Accesories 0.10 lot 20.00 bh 2.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 20.00 = 2.16 OH 1 hari = 2.16 oh
Tukang 0.180 OH 20.00 = 3.60 OH 1 hari = 3.60 oh
kepala tukang 0.018 OH 20.00 = 0.36 OH 1 hari = 0.36 oh
Mandor 0.005 OH 20.00 = 0.11 OH 1 hari = 0.11 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

BSP (riser) ø 2 1/2 inc 5 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2 1/2” 1.00 m3 5.00 m 5.00 m3
Support & Accesories 0.10 lot 5.00 bh 0.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 5.00 = 0.54 OH 1 hari = 0.54 oh
Tukang 0.180 OH 5.00 = 0.90 OH 1 hari = 0.90 oh
kepala tukang 0.018 OH 5.00 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 20 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 1” 1.00 m3 20.00 m 20.00 m3
Support & Accesories 0.10 lot 20.00 bh 2.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 20.00 = 2.16 OH 1 hari = 2.16 oh
Tukang 0.180 OH 20.00 = 3.60 OH 1 hari = 3.60 oh
kepala tukang 0.018 OH 20.00 = 0.36 OH 1 hari = 0.36 oh
Mandor 0.005 OH 20.00 = 0.11 OH 1 hari = 0.11 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

BSP ø 1 1/2 inc 5 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 1 1/2” 1.00 m3 5.00 m 5.00 m3
Support & Accesories 0.10 lot 5.00 bh 0.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 5.00 = 0.54 OH 1 hari = 0.54 oh
Tukang 0.180 OH 5.00 = 0.90 OH 1 hari = 0.90 oh
kepala tukang 0.018 OH 5.00 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh
● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

BSP ø 2 inc 10 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2” 1.00 m3 10.00 m 10.00 m3
Support & Accesories 0.10 lot 10.00 bh 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 10.00 = 1.08 OH 1 hari = 1.08 oh
Tukang 0.180 OH 10.00 = 1.80 OH 1 hari = 1.80 oh
kepala tukang 0.018 OH 10.00 = 0.18 OH 1 hari = 0.18 oh
Mandor 0.005 OH 10.00 = 0.05 OH 1 hari = 0.05 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

BSP ø 2 1/2 inc 20 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2 1/2 ” 1.00 m3 20.00 m 20.00 m3
Support & Accesories 0.10 lot 20.00 bh 2.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 20.00 = 2.16 OH 1 hari = 2.16 oh
Tukang 0.180 OH 20.00 = 3.60 OH 1 hari = 3.60 oh
kepala tukang 0.018 OH 20.00 = 0.36 OH 1 hari = 0.36 oh
Mandor 0.005 OH 20.00 = 0.11 OH 1 hari = 0.11 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

BSP (riser) ø 2 1/2 inc 5 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2 1/2 ” 1.00 m3 5.00 m 5.00 m3
Support & Accesories 0.10 lot 5.00 bh 0.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 5.00 = 0.54 OH 1 hari = 0.54 oh
Tukang 0.180 OH 5.00 = 0.90 OH 1 hari = 0.90 oh
kepala tukang 0.018 OH 5.00 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Drain Pipa Sprinkler (BSP Sch 40, incl. accessories)


BSP ø 1 inc 20 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 1” 1.00 m3 20.00 m 20.00 m3
Support & Accesories 0.10 lot 20.00 bh 2.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 20.00 = 2.16 OH 1 hari = 2.16 oh
Tukang 0.180 OH 20.00 = 3.60 OH 1 hari = 3.60 oh
kepala tukang 0.018 OH 20.00 = 0.36 OH 1 hari = 0.36 oh
Mandor 0.005 OH 20.00 = 0.11 OH 1 hari = 0.11 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

BSP (riser drain) ø 2 inc 5 m


Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 2” 1.00 m3 5.00 m 5.00 m3
Support & Accesories 0.10 lot 5.00 bh 0.50 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 5.00 = 0.54 OH 1 hari = 0.54 oh
Tukang 0.180 OH 5.00 = 0.90 OH 1 hari = 0.90 oh
kepala tukang 0.018 OH 5.00 = 0.09 OH 1 hari = 0.09 oh
Mandor 0.005 OH 5.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Valve (Class 20 K) & Accessories


Gate Valve ø 1 inc 1 unit
Bahan : Koef. Volume Jumlah
Gate Valve dia. 1” 1.00 bh 1.00 m 1.00 bh
Hanger & Support 0.28 lot 1.00 bh 0.28 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
Tukang 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
kepala tukang 0.010 OH 1.00 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.005 OH 1.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Gate Valve ø 2 1/2 inc 1 unit


Bahan : Koef. Volume Jumlah
Gate Valve dia. 2 1/2” 1.00 bh 1.00 m 1.00 bh
Hanger & Support 0.28 lot 1.00 bh 0.28 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
Tukang 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh
kepala tukang 0.010 OH 1.00 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.005 OH 1.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Pressure Reducing Valve ø 2 1/2 inc 1 unit


Bahan : Koef. Volume Jumlah
Pressure Reducing Valve 1.00 bh 1.00 m 1.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Flow switch 1 unit


Bahan : Koef. Volume Jumlah
Flow switch 1.00 bh 1.00 m 1.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Head sprinkler (pendent type) 26 unit


Bahan : Koef. Volume Jumlah
Head sprinkler (pendent type) 1.00 bh 26.00 m 26.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 26.00 = 2.60 OH 1 hari = 2.60 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Branch control valve, terdiri dari 1 set


Gate Valve ø 6 inc
Gate Valve ø 1 inc
Flow switch
Sight glass
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 1.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

PEKERJAAN SOUND SYSTEM BY OWNEER

PEKERJAAN FIRE ALARM


Rate Of Rise Heat Detector 17 bh
Bahan : Koef. Volume Jumlah
Rate Of Rise Heat Detector 1.00 bh 17.00 m 17.00 bh
Peralatan Bantu 1.00 lot 17.00 bh 17.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.090 OH 17.00 = 1.53 OH 1 hari = 1.53 oh
Tukang 0.125 OH 17.00 = 2.13 OH 1 hari = 2.13 oh
kepala tukang 0.013 OH 17.00 = 0.21 OH 1 hari = 0.21 oh
Mandor 0.004 OH 17.00 = 0.07 OH 1 hari = 0.07 oh
● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 1 bh
Bahan : Koef. Volume Jumlah
Manual push button 1.00 bh 1.00 m 1.00 bh
Alarm bell 1.00 bh 1.00 m 1.00 bh
Indicator lamp 1.00 bh 1.00 m 1.00 bh
Peralatan Bantu 1.00 lot 1.00 m 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.090 OH 1.00 = 0.09 OH 1 hari = 0.09 oh
Tukang 0.125 OH 1.00 = 0.13 OH 1 hari = 0.13 oh
kepala tukang 0.013 OH 1.00 = 0.01 OH 1 hari = 0.01 oh
Mandor 0.004 OH 1.00 = 0.00 OH 1 hari = 0.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Instalasi Fire Alarm 17 ttk


Bahan : Koef. Volume Jumlah
NYA 1,5 mm2 48.00 m 17.00 m 816.00 m
Pipa High Impact, dia. 1/2" 4.00 m 17.00 m 68.00 m
Peralatan Bantu 1.00 lot 17.00 m 17.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 17.00 = 4.25 OH 1 hari = 4.25 oh
Tukang 0.550 OH 17.00 = 9.35 OH 1 hari = 9.35 oh
kepala tukang 0.055 OH 17.00 = 0.94 OH 1 hari = 0.94 oh
Mandor 0.018 OH 17.00 = 0.31 OH 1 hari = 0.31 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Intalasi Push button, Alarm bell, Indicator lamp & Fighting Tlp. 1 ttk
Bahan : Koef. Volume Jumlah
NYA 1,5 mm2 48.00 m 1.00 m 48.00 m
Pipa High Impact, dia. 1/2" 4.00 m 1.00 m 4.00 m
Peralatan Bantu 1.00 lot 1.00 m 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 1.00 = 0.25 OH 1 hari = 0.25 oh
Tukang 0.550 OH 1.00 = 0.55 OH 1 hari = 0.55 oh
kepala tukang 0.055 OH 1.00 = 0.06 OH 1 hari = 0.06 oh
Mandor 0.018 OH 1.00 = 0.02 OH 1 hari = 0.02 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

TB - FA. 10 pairs 1 bh
Bahan : Koef. Volume Jumlah
TBFA 1.00 bh 1.00 m 1.00 bh
Peralatan Bantu 1.00 lot 1.00 m 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.250 OH 1.00 = 0.25 OH 1 hari = 0.25 oh
Tukang 0.350 OH 1.00 = 0.35 OH 1 hari = 0.35 oh
kepala tukang 0.035 OH 1.00 = 0.04 OH 1 hari = 0.04 oh
Mandor 0.012 OH 1.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

PEKERJAAN CCTV BY OWNEER

III PEKERJAAN LANTAI 2 TAHAP BERIKUTNYA

III. SITE

I PEKERJAAN MEKANIKAL & ELEKTRIKAL SITE PLAN


PEKERJAAN PANEL & TRANSFORMATOR
Transformator kapasitas 100 kVA Oil Type 1 set
Bahan : Koef. Volume Jumlah
Transformator 100 kva 1.00 bh 1.00 m 1.00 bh
Peralatan Bantu 1.00 lot 1.00 m 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.275 OH 1.00 = 0.28 OH 1 hari = 0.28 oh
Tukang 0.500 OH 1.00 = 0.50 OH 1 hari = 0.50 oh
kepala tukang 0.050 OH 1.00 = 0.05 OH 1 hari = 0.05 oh
Mandor 0.017 OH 1.00 = 0.02 OH 1 hari = 0.02 oh

● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 17

PP - OD 1 set
Bahan : Koef. Volume Jumlah
MCB 16 A 3PH 1.00 bh 1.00 m 1.00 bh
MCB 10 A 1 PH 3.00 bh 1.00 m 3.00 bh
MCB 2 A 1 PH 12.00 bh 1.00 m 12.00 bh
Pilot Lamp 3.00 bh 1.00 m 3.00 bh
Fuse Pilot Lamp 3.00 bh 1.00 m 3.00 bh
Wiring & Busbar 1.00 bh 1.00 m 1.00 bh
Panel Kosong uk. 70 x 90 x 30 cm 1.00 bh 1.00 m 1.00 bh
Ongkos Pasang & stel 1.00 bh 1.00 m 1.00 bh
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
PAKET PASANG 1.000 LS 1.00 = 1.00 LS 1 hari = 1.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 17

PEKERJAAN INSTALASI KABEL FEEDER


Kabel Feeder dari LVMDP ke :
Panel PP - OD NYFGbY 4 x 4 mm2 20 m
Bahan : Koef. Volume Jumlah
NYFGbY 4 x 4 mm2 1.00 bh 20.00 m 20.00 bh
Peralatan Bantu 1.00 lot 20.00 m 20.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.030 OH 20.00 = 0.60 OH 1 hari = 0.60 oh
Tukang 0.050 OH 20.00 = 1.00 OH 1 hari = 1.00 oh
kepala tukang 0.005 OH 20.00 = 0.10 OH 1 hari = 0.10 oh
Mandor 0.002 OH 20.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

PEKERJAAN PENERANGAN LUAR


Tiang PJU baja, Standard Octagonal, Parabole type, Single, 12 unit TAHAP BERIKUTNYA
Hot dip Galvanized, tinggi 7 m
Lampu LED 70 W 12 unit TAHAP BERIKUTNYA

PEKERJAAN PLUMBING
Pompa Deep Well 1 unit TAHAP BERIKUTNYA
Pompa Deep Well include panel, cable & accessories
Type : Submersible
Capacity : 200 liter/menit
Head : 150 m

Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)


PVC ø 2 inc. 90 m
Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 90.00 = 90.00 m
Hanger & Support 0.28 lot 90.00 = 25.20 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 90.00 = 9.00 OH 1 hari = 9.00 oh
Tukang 0.100 OH 90.00 = 9.00 OH 1 hari = 9.00 oh
kepala tukang 0.010 OH 90.00 = 0.90 OH 1 hari = 0.90 oh
Mandor 0.005 OH 90.00 = 0.45 OH 1 hari = 0.45 oh

● Rencana Waktu Pelaksanaan : Minggu ke 12 s/d minggu ke 12

PVC (Riser) ø 2 inc. 20 m


Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 20.00 = 20.00 m
Hanger & Support 0.28 lot 20.00 = 5.60 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
Tukang 0.100 OH 20.00 = 2.00 OH 1 hari = 2.00 oh
kepala tukang 0.010 OH 20.00 = 0.20 OH 1 hari = 0.20 oh
Mandor 0.005 OH 20.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

Pipa air kotor (PVC class 10 kg/cm2, incl. accessories)


PVC ø 4 inc. 40 m
Bahan : Koef. Volume Jumlah
PVC dia. 4” 1.00 m 40.00 = 40.00 m
Hanger & Support 0.28 lot 40.00 = 11.20 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 40.00 = 4.00 OH 1 hari = 4.00 oh
Tukang 0.100 OH 40.00 = 4.00 OH 1 hari = 4.00 oh
kepala tukang 0.010 OH 40.00 = 0.40 OH 1 hari = 0.40 oh
Mandor 0.005 OH 40.00 = 0.20 OH 1 hari = 0.20 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

PVC ø 6 inc. 141 m


Bahan : Koef. Volume Jumlah
PVC dia. 6” 1.00 m 141.00 = 141.00 m
Hanger & Support 0.28 lot 141.00 = 39.48 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 141.00 = 14.10 OH 7 hari = 2.01 oh
Tukang 0.100 OH 141.00 = 14.10 OH 7 hari = 2.01 oh
kepala tukang 0.010 OH 141.00 = 1.41 OH 7 hari = 0.20 oh
Mandor 0.005 OH 141.00 = 0.71 OH 7 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 9 s/d minggu ke 9

Bak kontrol 12 unit


Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pasang 1.000 ls 12.00 = 1.00 ls 1 hari = 1.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Biofil BF-08 2 unit


Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pasang 1.000 ls 2.00 = 1.00 ls 1 hari = 1.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

Resapan 15 unit
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
pasang 1.000 ls 15.00 = 1.00 ls 1 hari = 1.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 14 s/d minggu ke 14

PEKERJAAN PENCEGAH KEBAKARAN


Hydrant Box (Outdoor) 4 set TAHAP BERIKUTNYA
Material : 1,2 mm
Dimensi : 00 mm
House Rack : 2,5 inc
Fire House : 00 mm
Hydrant Nozzle : 2,5 inc

Hydrant Pillar 4 unit TAHAP BERIKUTNYA

Seamese Connection 2 unit TAHAP BERIKUTNYA


Size : 65 mm

Hydrant Pipe (BSP Sch.40, incl. accessories)


BSP ø 4 inc 50 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 4” 1.00 m3 50.00 m 50.00 m3
Support & Accesories 0.10 lot 50.00 bh 5.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 50.00 = 5.40 OH 1 hari = 5.40 oh
Tukang 0.180 OH 50.00 = 9.00 OH 1 hari = 9.00 oh
kepala tukang 0.018 OH 50.00 = 0.90 OH 1 hari = 0.90 oh
Mandor 0.005 OH 50.00 = 0.27 OH 1 hari = 0.27 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

BSP ø 6 inc 50 m
Bahan : Koef. Volume Jumlah
BSP SCH.40 dia. 6” 1.00 m3 50.00 m 50.00 m3
Support & Accesories 0.10 lot 50.00 bh 5.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.108 OH 50.00 = 5.40 OH 1 hari = 5.40 oh
Tukang 0.180 OH 50.00 = 9.00 OH 1 hari = 9.00 oh
kepala tukang 0.018 OH 50.00 = 0.90 OH 1 hari = 0.90 oh
Mandor 0.005 OH 50.00 = 0.27 OH 1 hari = 0.27 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Valve Class 20 kg
Gate Valve ø 4 inc 6 unit
Bahan : Koef. Volume Jumlah
Gate Valve dia. 4 inc 1.00 bh 6.00 m 6.00 bh
Hanger & Support 0.28 lot 6.00 bh 1.68 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 6.00 = 0.60 OH 1 hari = 0.60 oh
Tukang 0.100 OH 6.00 = 0.60 OH 1 hari = 0.60 oh
kepala tukang 0.010 OH 6.00 = 0.06 OH 1 hari = 0.06 oh
Mandor 0.005 OH 6.00 = 0.03 OH 1 hari = 0.03 oh

● Rencana Waktu Pelaksanaan : Minggu ke 13 s/d minggu ke 13

Check Valve ø 4 inc 2 unit


Bahan : Koef. Volume Jumlah
Gate Valve dia. 4 inc 1.00 bh 2.00 m 2.00 bh
Hanger & Support 0.28 lot 2.00 bh 0.56 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 2.00 = 0.20 OH 1 hari = 0.20 oh
Tukang 0.100 OH 2.00 = 0.20 OH 1 hari = 0.20 oh
kepala tukang 0.010 OH 2.00 = 0.02 OH 1 hari = 0.02 oh
Mandor 0.005 OH 2.00 = 0.01 OH 1 hari = 0.01 oh

● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 17

II PEKERJAAN MEKANIKAL & ELEKTRIKAL R. POMPA

PEKERJAAN INSTALASI KABEL FEEDER TAHAP BERIKUTNYA

PEKERJAAN ELEKTRIKAL TAHAP BERIKUTNYA

PEKERJAAN PLUMBING
Pipa air bersih (PVC class 10 kg/cm2, incl. accessories)
PVC ø 2 inc. 50 m
Bahan : Koef. Volume Jumlah
PVC dia. 2” 1.00 m 50.00 = 50.00 m
Hanger & Support 0.28 lot 50.00 = 14.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 50.00 = 5.00 OH 1 hari = 5.00 oh
Tukang 0.100 OH 50.00 = 5.00 OH 1 hari = 5.00 oh
kepala tukang 0.010 OH 50.00 = 0.50 OH 1 hari = 0.50 oh
Mandor 0.005 OH 50.00 = 0.25 OH 1 hari = 0.25 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Pompa Air Bersih 2 unit


Pompa Transfer include panel, cable & accessories
Type : ifugal Endsuction
Capacity : 150 liter/menit
Head : 20 m

Bahan : Koef. Volume Jumlah


Pompa Air Bersih 1.00 m 2.00 = 2.00 m
Hanger & Support 1.00 lot 2.00 = 2.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 1.000 ls 2.00 = 2.00 ls 1 hari = 2.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Pipa air hujan (PVC class 10 kg/cm2, incl. accessories)


PVC ø 4 inc. 10 m TAHAP BERIKUTNYA
Roof Drain ø 4 inc. 2 m TAHAP BERIKUTNYA

PEKERJAAN EXHAUST FAN


EXHAUST FAN INCL.INSTALASI & Kotak Kontak
- Capacity : 450 CMH , type Wall 2 unit TAHAP BERIKUTNYA

PEKERJAAN PENCEGAH KEBAKARAN


Electric Pump incl.panel 1 unit BY OWNEER
Tipe : Vertical Turbine
Kapasitas : 750 GPM
Total Head : 100 m

Diesel Pump incl. panel, tangki bahan bakar & accessories 1 unit BY OWNEER
Tipe : Vertical Turbine
Kapasitas : 750 GPM
Total Head : 100 m

Jockey Pump 1 unit BY OWNEER


Tipe : multistage inline
Kapasitas : 15 GPM
Total Head : 110 m

Valve (Class 20 K) & Accessories


Gate Valve ø 2 inc 1 unit TAHAP BERIKUTNYA
Gate Valve ø 2 1/2 inc 1 unit TAHAP BERIKUTNYA
Gate Valve ø 6 inc 7 unit TAHAP BERIKUTNYA
Gate Valve ø 8 inc 1 unit TAHAP BERIKUTNYA
Check Valve ø 2 inc 1 unit TAHAP BERIKUTNYA
Check Valve ø 6 inc 2 unit TAHAP BERIKUTNYA

Flexible joint (Class 20 K) & Accessories


Joint Coupling ø 2 inc 1 unit TAHAP BERIKUTNYA
Joint Coupling ø 2 1/2 inc 1 unit TAHAP BERIKUTNYA
Joint Coupling ø 6 inc 4 unit TAHAP BERIKUTNYA

Accessories
Strainer ø 6 inc 2 unit TAHAP BERIKUTNYA
Automatic Air Release valve 1 unit TAHAP BERIKUTNYA
Pressure gauge 3 unit TAHAP BERIKUTNYA
Safety valve 1 unit TAHAP BERIKUTNYA

Pipa pemadam kebakaran (BSP Sch 40, incl. accessories)


BSP ø 2 inc 3 m TAHAP BERIKUTNYA
BSP ø 2 1/2 inc 3 m TAHAP BERIKUTNYA
BSP ø 6 inc 25 m TAHAP BERIKUTNYA

Testing & Commissioning 1 lot TAHAP BERIKUTNYA

Fire extinguiser 1 set TAHAP BERIKUTNYA


Capacity : 3 kg
Type : Dry chemical
III PEKERJAAN MEKANIKAL & ELEKTRIKAL R. PANEL

Biaya Penyambungan PLN 105 kVA


Bahan : Koef. Volume Jumlah
Penyambungan PLN 1.00 KVa 105.00 m 105.00 KVa
Biaya Jaminan 1.00 KVa 105.00 bh 105.00 KVa
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.275 OH 105.00 = 28.88 OH 1 hari = 28.88 oh
Tukang 0.500 OH 105.00 = 52.50 OH 1 hari = 52.50 oh
kepala tukang 0.050 OH 105.00 = 5.25 OH 1 hari = 5.25 oh
Mandor 0.017 OH 105.00 = 1.75 OH 1 hari = 1.75 oh

● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 17

LVMDP 1 set
Bahan : Koef. Volume Jumlah
MCCB 200 A 3PH 2.00 KVa 1.00 m 2.00 KVa
Interlock System 1.00 KVa 1.00 m 1.00 KVa
MCCB 100 A 3PH 2.00 KVa 1.00 m 2.00 KVa
MCB 40 A 3 PH 3.00 KVa 1.00 m 3.00 KVa
MCB 25 A 3PH 1.00 KVa 1.00 m 1.00 KVa
MCB 16 A 3 PH 1.00 KVa 1.00 m 1.00 KVa
MCB 4 A 1PH 2.00 KVa 1.00 m 2.00 KVa
Digital Power Meter 2.00 KVa 1.00 m 2.00 KVa
Current Traffo 400/ 5A 6.00 KVa 1.00 m 6.00 KVa
Pilot Lamp 3.00 KVa 1.00 m 3.00 KVa
Fuse Pilot Lamp 3.00 KVa 1.00 m 3.00 KVa
Wiring & Busbar 1.00 KVa 1.00 m 1.00 KVa
Panel Kosong uk. 180 x 160 x 60 cm 1.00 KVa 1.00 m 1.00 KVa
Ongkos Pasang & stel 1.00 KVa 1.00 m 1.00 KVa
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
paket pasang 1.000 ls 1.00 = 1.00 ls 1 hari = 1.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 17 s/d minggu ke 17

PEKERJAAN INSTALASI KABEL FEEDER


Kabel Feeder dari LVMDP ke :
Panel PP - GWT & R. POMPA NYFGbY 4 x 10 mm2 20 m
Bahan : Koef. Volume Jumlah
NYFGbY 4 x 10 mm2 1.00 m 20.00 m 20.00 m
Peralatan Bantu 1.00 lot 20.00 bh 20.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.045 OH 20.00 = 0.90 OH 1 hari = 0.90 oh
Tukang 0.070 OH 20.00 = 1.40 OH 1 hari = 1.40 oh
kepala tukang 0.007 OH 20.00 = 0.14 OH 1 hari = 0.14 oh
Mandor 0.002 OH 20.00 = 0.05 OH 1 hari = 0.05 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Kwh Meter R. PANEL NYFGbY 3 x 2,5 mm2 20 m


Bahan : Koef. Volume Jumlah
NYFGbY 3 x 2,5 mm2 1.00 m 20.00 m 20.00 m
Peralatan Bantu 1.00 lot 20.00 bh 20.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.045 OH 20.00 = 0.90 OH 1 hari = 0.90 oh
Tukang 0.070 OH 20.00 = 1.40 OH 1 hari = 1.40 oh
kepala tukang 0.007 OH 20.00 = 0.14 OH 1 hari = 0.14 oh
Mandor 0.002 OH 20.00 = 0.05 OH 1 hari = 0.05 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Kwh Meter POS JAGA NYFGbY 3 x 2,5 mm2 30 m


Bahan : Koef. Volume Jumlah
NYFGbY 3 x 2,5 mm2 1.00 m 30.00 m 30.00 m
Peralatan Bantu 1.00 lot 30.00 bh 30.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.045 OH 30.00 = 1.35 OH 1 hari = 1.35 oh
Tukang 0.070 OH 30.00 = 2.10 OH 1 hari = 2.10 oh
kepala tukang 0.007 OH 30.00 = 0.21 OH 1 hari = 0.21 oh
Mandor 0.002 OH 30.00 = 0.07 OH 1 hari = 0.07 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

PEKERJAAN MEP R.PANEL


TL LED 1x18 W (V-SHAPE) 1 unit
Bahan : Koef. Volume Jumlah
Lampu TL LED 18 watt 1.00 bh 1.00 m 1.00 bh
Armature Vshape 1.00 bh 1.00 m 1.00 bh
accessories 1.00 lot 1.00 bh 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.046 OH 1.00 = 0.05 OH 1 hari = 0.05 oh
Tukang 0.023 OH 1.00 = 0.02 OH 1 hari = 0.02 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Saklar tunggal 1 unit


Bahan : Koef. Volume Jumlah
Saklar Tunggal 1.00 bh 1.00 m 1.00 bh
Peralatan Bantu 1.00 lot 1.00 bh 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.020 OH 1.00 = 0.02 OH 1 hari = 0.02 oh
Tukang 0.025 OH 1.00 = 0.03 OH 1 hari = 0.03 oh
kepala tukang 0.003 OH 1.00 = 0.00 OH 1 hari = 0.00 oh
Mandor 0.001 OH 1.00 = 0.00 OH 1 hari = 0.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Kotak Kontak 2 unit


Bahan : Koef. Volume Jumlah
NYM 3 x 2,5 mm2 13.00 m 2.00 m 26.00 m
Pipa High Impact, dia. 1/2" 13.00 m 2.00 bh 26.00 m
Peralatan Bantu 1.00 lot 2.00 bh 2.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.150 OH 2.00 = 0.30 OH 1 hari = 0.30 oh
Tukang 0.015 OH 2.00 = 0.03 OH 1 hari = 0.03 oh
Mandor 0.050 OH 2.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Instalansi Penerangan 1 ttk


Bahan : Koef. Volume Jumlah
NYM 3 x 2,5 mm2 11.00 m 1.00 m 11.00 m
Pipa High Impact, dia. 1/2" 11.00 m 1.00 bh 11.00 m
Peralatan Bantu 1.00 lot 1.00 bh 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.150 OH 1.00 = 0.15 OH 1 hari = 0.15 oh
Tukang 0.015 OH 1.00 = 0.02 OH 1 hari = 0.02 oh
Mandor 0.050 OH 1.00 = 0.05 OH 1 hari = 0.05 oh

● Rencana Waktu Pelaksanaan : Minggu ke 15 s/d minggu ke 15

Instalansi Kotak Kontak 2 ttk


Bahan : Koef. Volume Jumlah
NYM 3 x 2,5 mm2 13.00 m 2.00 m 26.00 m
Pipa High Impact, dia. 1/2" 13.00 m 2.00 bh 26.00 m
Peralatan Bantu 1.00 lot 2.00 bh 2.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.150 OH 2.00 = 0.30 OH 1 hari = 0.30 oh
Tukang 0.015 OH 2.00 = 0.03 OH 1 hari = 0.03 oh
Mandor 0.050 OH 2.00 = 0.10 OH 1 hari = 0.10 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

kWh Meter 1 PH (incl. Box MCB & Accesories) 1 unit


Bahan : Koef. Volume Jumlah
KWH Meter 1 PH 1.00 m 1.00 m 1.00 m
MCB Box 1.00 bh 1.00 bh 1.00 bh
MCB 4 A 1 PH 1.00 bh 1.00 bh 1.00 bh
MCB 2 A 1 PH 3.00 bh 1.00 bh 3.00 bh
NYM Standart 3 x 2,5 mm2 15.00 m 1.00 m 15.00 m
Peralatan Bantu 1.00 lot 1.00 lot 1.00 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.275 OH 1.00 = 0.28 Ls 1 hari = 0.28 oh
Tukang 0.500 OH 1.00 = 0.50 Ls 7 hari = 0.07 oh
kepala tukang 0.050 OH 1.00 = 0.05 Ls 7 hari = 0.01 oh
Mandor 0.017 OH 1.00 = 0.02 Ls 7 hari = 0.00 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

PEKERJAAN PLUMBING
Pipa air hujan (PVC class 10 kg/cm2, incl. accessories)
PVC ø 4 inc. 10 m
Bahan : Koef. Volume Jumlah
PVC dia. 4” 1.00 m 10.00 = 10.00 m
Hanger & Support 0.28 lot 10.00 = 2.80 lot
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.100 OH 10.00 = 1.00 OH 1 hari = 1.00 oh
Tukang 0.100 OH 10.00 = 1.00 OH 1 hari = 1.00 oh
kepala tukang 0.010 OH 10.00 = 0.10 OH 1 hari = 0.10 oh
Mandor 0.005 OH 10.00 = 0.05 OH 1 hari = 0.05 oh

● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16

Roof Drain ø 4 inc. 2 m


Bahan : Koef. Volume Jumlah
Roof drain Sts Ø 3" 1.000 BH 2.00 = 2.00 BH
Tenaga Kerja : Koef. Volume Jumlah Durasi Jumlah org/hari
Pekerja 0.010 OH 2.00 = 0.02 OH 1 hari = 0.02 oh
Tukang 0.100 OH 2.00 = 0.20 OH 1 hari = 0.20 oh
Kepala tukang 0.010 OH 2.00 = 0.02 OH 1 hari = 0.02 oh
Mandor 0.005 OH 2.00 = 0.01 OH 1 hari = 0.01 oh
● Rencana Waktu Pelaksanaan : Minggu ke 16 s/d minggu ke 16
SPESIFIKASI TEKNIS
REVITALISASI PASAR RAKYAT LELES (LANJUTAN)
LOKASI LELES
KABUPATEN GARUT
TAHUN ANGGARAN 2019

No. Jenis Bahan Bangunan Sat.


1 2 3
A JENIS AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADI.
- Sirtu m3
- Pasir Pasang m3
- Pasir Urug m3
- Pasir Beton m3
- Batu pecah mesin 2:3 m3
- Batu belah pondasi m3
- Bata merah bakar kelas I bh
- Batu pecah 10:15 bh
- Beton Ready Mix K. 250 m3
- Beton Ready Mix K. 300 m3
- Urugan Pilihan m3
- Semen Type I (50 Kg) kg
- Semen putih kg
- Semen warna kg
- Grevel U 20 m1
B BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA
- Plamir tembok kg
- Cat tembok Eksterior kg
- Cat tembok interior kg
- Rol cat + bak bh
- Kuas 3" bh
- Terpentin ltr
- Thiner B ltr
- Ampelas lbr

No. Jenis Bahan Bangunan Sat.


1 2 3
- Dempul kayu kg
- Meni besi / kayu kg
- Cat kayu sek. Seiv kg
- Cat dasar besi ltr
- Cat dasar tembok kg
- Minyak Bekisting ltr
- Lem fox kg
C BAHAN KAYU BERIKUT BAHAN JADINYA
- Kayu Terentang m3
- Kayu kamper Singkil / Kapur m3
- Kayu balok Borneo super m3
- Kayu papan kelas II m3
- Multiplek 12 mm, uk. 1,20 x 2,40 lebar
- Kayu kaso Albasia m3
- Kayu kaso 5/7 kelas II m3
- Kayu papan Albasia m3
- Bambu dia. 8 cm - 10 cm m1
- Dolken dia 8 s/d 10 cm btg
- List profil kayu kamper 10 cm m1
D. BAHAN PENUTUP RANGKA PLAFOND
- Gipsum 120 x 240 cm sek. Jayaboard lbr
- GRC lbr
- rangka hollow m1
- aksesoris plafond m1
E. BAHAN LANTAI DAN PELAPIS DINDING.
- keramik 40 x 40 m2
- plint keramik m2
- keramik meja m2
- keramik lantai wc m2
- keramik dinding wc m2

No. Jenis Bahan Bangunan Sat.


1 2 3
F. BAHAN LOGAM DAN BAHAN JADINYA
- Besi Beton U-32, ulir kg
- Baja Tulangan U-24, polos kg
- Bondek 0,75 mm m2
- Besi hollow 4/4 cm m1
- Besi hollow 2/4 cm m1
- Profil alumunium 4 " sek. ALEXINDO warna m1
- Profil alumunium 3 " sek. Alexindo m1
- Profil alumunium daun pintu m1
- Profil alumunium daun jendela m1
- Kawat beton kg
- Seng BJLS 30, lebar 90 cm ( 1 rol = 50 m' ) m1
- Seng gelombang BJLS 25 uk. 0.90 x 1.80 m lbr
- Atap genteng murando glasur bh
- Bubungan genteng murando glasur bh
- Genteng metal m2
G. BAHAN PAKU DAN MUR BAUD
- Paku 1 s/d 3 cm kg
- Paku 4 s/d 7 cm kg
- Paku sekrup bh
- Paku triplex kg
H. BAHAN PERPIPAAN DAN SANITAIR
- Pipa pralon PVC. ( AW ) dia 1/2 ", sekulaitas Maspion (Abu-abu) btg
- Pipa pralon PVC. ( AW ) dia 3/4 ", sekulaitas Maspion (Abu-abu) btg
- Pipa pralon PVC. ( AW ) dia 1 ", sekulaitas Maspion ( Abu - abu ) btg
- Pipa pralon PVC. ( AW ) dia 2 ", sekulaitas Maspion ( Abu - abu ) btg
- Pipa pralon PVC. ( AW ) dia 3 ", sekulaitas Maspion ( Abu - abu ) btg
- Pipa pralon PVC. ( AW ) dia 4 ", sekulaitas Maspion ( Abu - abu ) btg
- Kran tembok Ø 1/2 " bh
- Kran bebek Ø 1/2 " bh
- Kran panas / dingin Standar bh
- Tempat sabun porselein bh
- Floor drain bh
- Wastafel standar, lengkap bh
- Urinoir lengkap setara toto warna standar lengkap bh
- Kloset jongkok porselen, warna setara TOTO bh
H. BAHAN PERPIPAAN DAN SANITAIR
- bahan dll
SPESIFIKASI TEKNIS

SPESIFIKASI BAHAN LOKASI PENGAMBILAN BAHAN


4 5

Tidak mengandung bahan organik, lumpur dan sejenisnya Matrial Terdekat / GARUT

Agregat halus dan kasar dipakai agregat dari batuan alami yang memenuhi syarat Matrial Terdekat / GARUT
menurut PBI 1971 (NI-2)

Mempunyai rusuk-rusuk yang tajam dan siku, bidang-bidang sisinya harus datar, tidak
menunjukkan retak-retak pembakarannya harus merata dan matang Matrial Terdekat / GARUT
Agregat halus dan kasar dipakai agregat dari batuan alami yang memenuhi syarat Matrial Terdekat / GARUT
menurut PBI 1971 (NI-2)
Menggunakan agregat halus dan kasar sesuai standar PBI (NI-2), Menggunakan semen Matrial Terdekat / GARUT
Tipe 1 dan dilengkapai hasil uji agregat, mix desain dan uji kuat tekan beton
Bersih dan keras memiliki nilai CBR minimal 6% Matrial Terdekat / GARUT

Tipe I menurut Peraturan Semen Portland Indonesia 1972 (NI-8) Matrial Terdekat / GARUT

Berkualitas baik dan tidak menunjukan retak-retak Matrial Terdekat / GARUT

Berkualitas Baik sek. Vinilex Matrial Terdekat / GARUT


Berkualitas Baik sek. Vinilex Matrial Terdekat / GARUT
Berkualitas Baik sek. Vinilex Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT

SPESIFIKASI BAHAN LOKASI PENGAMBILAN BAHAN


4 5
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Kering, berumur tua, lurus, tidak retak, tidak bengkok Matrial Terdekat / GARUT
Kering, berumur tua, lurus, tidak retak, tidak bengkok Matrial Terdekat / GARUT
Kering, berumur tua, lurus, tidak retak, tidak bengkok Matrial Terdekat / GARUT
Kering, berumur tua, lurus, tidak retak, tidak bengkok Matrial Terdekat / GARUT
Berkualitas baik, tidak bergelombang dan tidak rusak Matrial Terdekat / GARUT
Kering, berumur tua, lurus, tidak retak, tidak bengkok Matrial Terdekat / GARUT
Kering, berumur tua, lurus, tidak retak, tidak bengkok Matrial Terdekat / GARUT
Kering, berumur tua, lurus, tidak retak, tidak bengkok Matrial Terdekat / GARUT
Tua, lurus tidak bengkok Matrial Terdekat / GARUT
Kering, berumur tua, lurus, tidak retak, tidak bengkok Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT

Berkualitas Baik sesuai dengan RKS Matrial Terdekat / GARUT


Berkualitas Baik sesuai dengan RKS Matrial Terdekat / GARUT
Berkualitas Baik sesuai dengan RKS Matrial Terdekat / GARUT
Berkualitas Baik sesuai dengan RKS Matrial Terdekat / GARUT

Berkualitas Baik sesuai dengan RKS dan RAB Matrial Terdekat / GARUT
Berkualitas Baik sesuai dengan RKS dan RAB Matrial Terdekat / GARUT
Berkualitas Baik sesuai dengan RKS dan RAB Matrial Terdekat / GARUT
Berkualitas Baik sesuai dengan RKS dan RAB Matrial Terdekat / GARUT
Berkualitas Baik sesuai dengan RKS dan RAB Matrial Terdekat / GARUT

SPESIFIKASI BAHAN LOKASI PENGAMBILAN BAHAN


4 5

bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
bebas dari minyak, kotoran, cat, dan lain - lain yang dapat merusak Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas Baik Matrial Terdekat / GARUT
Berkualitas dan bermutu Tinggi, Anti Korosi Matrial Terdekat / GARUT
Berkualitas dan bermutu Tinggi, Anti Korosi Matrial Terdekat / GARUT
Berkualitas dan bermutu Tinggi, Anti Korosi Matrial Terdekat / GARUT
Berkualitas dan bermutu Tinggi, Anti Korosi Matrial Terdekat / GARUT

Berkualitas dan bermutu tinggi Matrial Terdekat / GARUT


Berkualitas dan bermutu tinggi Matrial Terdekat / GARUT
Berkualitas dan bermutu tinggi Matrial Terdekat / GARUT
Berkualitas dan bermutu tinggi Matrial Terdekat / GARUT
Berkualitas dan bermutu tinggi Matrial Terdekat / GARUT
Berkualitas dan bermutu tinggi Matrial Terdekat / GARUT
Berkualitas dan bermutu tinggi Matrial Terdekat / GARUT
Berkualitas dan bermutu tinggi Matrial Terdekat / GARUT
Berkualitas dan bermutu tinggi Matrial Terdekat / GARUT
Berkualitas dan bermutu tinggi Matrial Terdekat / GARUT
Berkualitas dan bermutu tinggi Matrial Terdekat / GARUT
Berkualitas dan bermutu tinggi Matrial Terdekat / GARUT
Berkualitas dan bermutu tinggi Matrial Terdekat / GARUT
Berkualitas dan bermutu tinggi Matrial Terdekat / GARUT

sesuai dengan RKS Matrial Terdekat / GARUT


Nama Perusahaan : PT ..................
Kegiatan : Revitalisasi Pasar Leles (Lanjutan)

No Uraian Pekerjaan Identifikasi Bahaya Sasaran K3 Proyek Pengendalian Resiko K3

(1) (2) (3) (4) (5)

1 Pekerjaan Beton Terjatuh, Tertimpa Material Semua Personil Menggunakan peralatan K3


dan Pekerja Proyek Bekerja Hati-hati
(Yang ada di Lokasi membuat baner untuk
Pekerjaan) utamakan keselamatan K3
Terjatuh, tertimpa material, tergores alat
Pekerjaan Rangka Baja, Atap dan pemotong rangka Baja, terpapar percikan Semua Personil Menggunakan peralatan K3
Penutup Atap dan Pekerja Proyek Bekerja Hati-hati
api potongan besi, tersengat listrik (Yang ada di Lokasi membuat baner untuk
Pekerjaan) utamakan keselamatan K3

Pekerjaan Railling Pagar Poid dan Terjatuh, tertimpa material, tergores alat Semua Personil Menggunakan peralatan K3
Tangga pemotong rangka Pipa railling, terpapar dan Pekerja Proyek Bekerja Hati-hati
percikan api potongan besi pipa realling (Yang ada di Lokasi membuat baner untuk
Pekerjaan) utamakan keselamatan K3

Pekerjaan Pemasangan Instalasi Terjatuh, Tersengat Aliran Listrik Semua Personil Menggunakan peralatan K3
Listrik dan Pekerja Proyek Bekerja Hati-hati
(Yang ada di Lokasi membuat baner untuk
Pekerjaan) utamakan keselamatan K3

Terjatuh, tertimpa material, terpapar Semua Personil Menggunakan peralatan K3


Pekerjaan Mekanikal dan Elektrika percikan api potongan besi, tersengat listrik dan Pekerja Proyek Bekerja Hati-hati
(Yang ada di Lokasi membuat baner untuk
Pekerjaan) utamakan keselamatan K3

Pekerjaan Pemasangan Rangka dindin Terjatuh, tertimpa material, terpapar Semua Personil Menggunakan peralatan K3
Partisi dan Penutup Partisi percikan api potongan besi rangka Beton, dan Pekerja Proyek Bekerja Hati-hati
terhirup aroma material pelapis dan (Yang ada di Lokasi membuat baner untuk
pereket (lem) Pekerjaan) utamakan keselamatan K3
Program Sumber Daya

(6)

Semua Perlengkapan K3
(termasuk alat dan bahan)
personil

Semua Perlengkapan K3
(termasuk alat dan bahan)
personil

Semua Perlengkapan K3
(termasuk alat dan bahan)
personil

Semua Perlengkapan K3
(termasuk alat dan bahan)
personil

Semua Perlengkapan K3
(termasuk alat dan bahan)
personil

Semua Perlengkapan K3
(termasuk alat dan bahan)