PEKERJAAN
UPAH DAN BAHAN
TAHUN ANGGARAN 2013
KOTA BOGOR
J BAHAN KACA
457 Glass Blead kg 22,000.00
458 Glass Block DN 20 x 20 ( Kedawung ) bh 23,000.00
459 Glass Block DN 20 x 20 Ex LN bh 88,600.00
460 Kaca 6 mm Gravver m² 1,306,800.00
461 Kaca Patri EX Luar negeri terpasang m² 3,746,200.00
462 Kaca Patri Lokal Terpasang ( ASAHI ) m² 1,379,400.00
463 Kaca Polos 2 mm ( ASAHI ) m² 43,600.00
464 Kaca Polos 3 mm ( ASAHI ) m² 63,400.00
465 Kaca Polos 5 mm ( ASAHI ) m² 93,600.00
466 Kaca Rayband 12 mm ( ASAHI ) m² 292,900.00
M BAHAN SANITAIR
552 Stop Kran 3/4 " KIT bh 94,400.00
553 Stop Kran 1 " KIT bh 130,700.00
554 Stop Kran 1 1/2 " KIT bh 226,600.00
555 Stop Kran 2 " KIT bh 313,700.00
556 Stop Kran 2 1/2" KIT bh 784,100.00
557 Stop Kran 3 " KIT bh 888,700.00
558 Check Valve 1/2 " bh 78,500.00
559 Double Neple 1/2 " bh 29,100.00
560 Water Mur 1/2 " bh 45,600.00
561 Gate Walve 1/2 " bh 58,100.00
562 Saringan Air Lt KM Stainless Steel bh 58,100.00
563 Apooer Bath Tube bh 284,600.00
564 Kran stain less Lokal Kait bh 49,700.00
565 Shower Dengan Tiang bh 196,100.00
566 Shower Tanpa Tiang bh 108,900.00
567 Kran Tembok Sun Eui dia. 1/2 " bh 87,200.00
568 Kran Tembok ITAP dia. 1/2 " bh 34,900.00
569 Kran Bebek Sun Eui 1/2 " bh 156,900.00
570 Kran Bebek ITAP 1/2 " bh 52,300.00
571 Kran Panas Dingin San Eui Standard bh 217,800.00
572 Bath Cape Washteren unit 2,368,300.00
573 Tempat Sabun Poslin bh 50,100.00
574 Wastafel Lengkap TOTO LW 230 unit 1,134,100.00
575 Wastafel Lengkap INA unit 750,000.00
576 Closet Jongkok Poslin warna TOTO unit 217,800.00
577 Closet Jongkok Standard Putih Poslin TOTO unit 191,700.00
578 Closet Jongkok Lengkap Sistem Jet TOTO unit 1,986,400.00
579 Closet Duduk Warna Standard TOTO C 240 Lengkap unit 1,876,000.00
580 Wastafel Bulat Warna Standard Lengkap unit 1,283,600.00
581 Closet Duduk Warna Standard lengkap INA bh 1,430,300.00
582 Urinoir Lengkap TOTO Warna Standard lengkap unit 1,938,500.00
583 Penyekat Poslin Urinoar TOTO lbr 523,500.00
584 Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) bh 409,200.00
585 Kitchen Zink Stainless Non Standard Franke ( 1 Lobang ) bh 1,252,800.00
586 Kitchen Zink Stainless Non Standard Franke ( 2 Lobang ) bh 1,873,100.00
587 Sealtipe bh 750.00
O BAHAN MEKANIKAL
631 AC Split 1 PK Setara TOSHIBA unit 4,743,200.00
632 AC Split 2 PK Setara TOSHIBA unit 21,642,100.00
633 AC Split 3 PK Setara TOSHIBA unit 30,310,500.00
634 Diesel Pump kap. 750 gln / menit 120 m1 ( 105 kW ) unit 623,267,400.00
635 Down Light +SL 25 W bh 127,800.00
636 Electrical Pump kap. 750 gln / menit 120 m1 ( 90 kW ) unit 249,307,000.00
637 Exhouse Fan H 100 W 40 x 40 cm unit 952,300.00
638 Exhouse Fan H 360 W 60 x 60 cm unit 5,366,400.00
639 Exhouse Fan H 380 W CFM 55 x 55 cm unit 6,050,000.00
640 Fire House 1.5 x 30 m + nose unit 5,198,200.00
641 Hydran Box dalam Gedung (lengkap) unit 6,461,400.00
642 Jockey Pump kap. 80 gln / menit 100 m1 ( 18,6 kW ) unit 72,714,500.00
643 Mesin AC Split DAIKIN ( Indoor / Outdoor Unit ) unit 1,980,000.00
644 Presure Tank kap. 500 liter lengkap unit 36,445,200.00
V ALAT TUKANG.
781 Alat-alat bantu bh 38,500.00
782 Cangkul bh 27,500.00
783 Karbit kg 5,900.00
784 Kawat Las Listrik kg 10,700.00
785 Linggis bh 27,500.00
786 Palu 0,5 kg bh 19,300.00
787 Pengki bh 13,800.00
788 Rool Meter 30 meter ( Bahan Plastik ) bh 82,500.00
789 Rool Meter 5 meter ( Bahan Besi ) bh 16,500.00
790 Sekop bh 27,500.00
791 Selang Plastik untuk Water Pas dia. 0.5 cm bh 1,600.00
792 Singkup bh 27,500.00
793 Tali Rami rool 7,300.00
794 Water Pas Alumuniumm 60 cm bh 33,000.00
Kota Bogor
Pembina Tk.I
A PEKERJAAN PERSIAPAN
A 001 Mengukur kembali 1 m2 Site 2,720.00
A 002 Memasang 1 m1 bouplank 38,650.00
A 003 Membuat 1 m2 Los kerja / Gudang 485,810.00
A 004 Membuat 1 m2 Kantor Direksi 617,840.00
A 005 Membuat 1 m2 Papan Nama Proyek 425,980.00
A 006 Mengerjakan 1 m2 Pagar Pengaman Proyek 372,690.00
A 007 Membongkar 1 m2 Dinding bata (Jika bongkaran di pakai lagi ) 11,640.00
A 008 Membongkar 1 m2 Dinding bata (Jika bongkaran tidak di pakai lagi ) 6,140.00
A 009 Membongkar 1 m2 Plesteran dinding 4,530.00
A 010 Membongkar 1 m2 Genteng/Sirap (Jika bongkaran di pakai lagi ) 2,910.00
A 011 Membongkar 1 m2 Genteng/Sirap (Jika bongkaran tidak di pakai lagi ) 1,810.00
A 012 Membongkar 1 m3 Kuda-kuda, Gording/Balok (Jika bongkaran di pakai lagi ) 749,100.00
A 013 Membongkar 1 m3 Kuda-kuda, Gording/Balok (Jika bongkaran tidak di pakai lagi ) 465,300.00
A 014 Membongkar 1 m2 Plafond (Jika bongkaran di pakai lagi ) 25,320.00
A 015 Membongkar 1 m2 Plafond (Jika bongkaran tidak di pakai lagi ) 7,230.00
A 016 Membongkar 1 m2 Rangka Atap/Reng kaso (Jika bongkaran di pakai lagi ) 16,000.00
A 017 Membongkar 1 m2 Rangka Atap/Reng kaso (Jika bongkaran tidak di pakai lagi ) 8,000.00
A 018 Membongkar 1 m3 Beton bertulang 133,800.00
A 019 Membersihkan 1 m2 lokasi kegiatan 5,850.00
M PEKERJAAN PAGAR
M 001 Memasang 1 m2 pagar depan tralis (standar) 579,270.00
M 002 Memasang 1 m2 pagar samping/belakang 595,660.00
O PEKERJAAN SANITARI
O 001 Memasang 1 buah Wastafel 1,033,290.00
O 002 Memasang 1 buah Bak KM Fiber 60 x 60 437,300.00
O 003 Memasang 1 buah Bank mandi bata merah volume 0,3 m3 999,830.00
O 004 Memasang 1 buah Closet Jongkok Standard Putih Poslin TOTO 434,720.00
O 005 Memasang 1 buah Urinoir Lengkap TOTO Warna Standard lengkap 2,291,310.00
O 006 Memasang 1 m' pipa galvanis ø 1/2" 43,360.00
O 007 Memasang 1 m' pipa galvanis ø 3/4" 48,650.00
O 008 Memasang 1 m' pipa galvanis ø 1" 65,050.00
O 009 Memasang 1 m' pipa galvanis ø 11/2" 94,120.00
O 010 Memasang 1 m' pipa galvanis ø2" 121,280.00
O 011 Memasang 1 m' pipa galvanis ø 4" 284,220.00
O 012 Memasang 1 m' pipa PVC tipe AW ø 1/2" 20,460.00
O 013 Memasang 1 m' PVC tipe AW ø 3/4" 22,170.00
O 014 Memasang 1 m' PVC tipe AW ø 1" 24,770.00
O 015 Memasang 1 m' PVC tipe AW ø 11/2" 35,120.00
O 016 Memasang 1 m' PVC tipe AW ø2" 102,770.00
O 017 Memasang 1 m' PVC tipe AW ø 4" 113,320.00
O 018 Memasang 1 bh kran air ø 3/4" atau 1/2" 73,390.00
O 019 Memasang 1 bh floor drain
1 Hasil Analisa Pekerjaan 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 D 002 735,410.00
2 Hasil Analisa Pekerjaan 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 D 003 771,540.00
3 Hasil Analisa Pekerjaan 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 D 004 799,930.00
4 Hasil Analisa Pekerjaan 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 D 006 833,420.00
5 Hasil Analisa Pekerjaan 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 D 007 865,540.00
6 Hasil Analisa Pekerjaan 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 D 008 889,400.00
7 Hasil Analisa Pekerjaan 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 D 009 905,380.00
8 Hasil Analisa Pekerjaan 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 D 010 932,820.00
9 Hasil Analisa Pekerjaan 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 D 011 941,360.00
10 Hasil Analisa Pekerjaan 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49 D 012 1,005,840.00
11 Hasil Analisa Pekerjaan 1 m3 beton mutu f’c = 28,8 MPa (K 350), slump (12 ± 2) cm, w/c = 0,49 D 013 1,017,000.00
12 Hasil Analisa Pekerjaan 1 m3 beton mutu K-175 (Ready Mix) D 014 916,180.00
13 Hasil Analisa Pekerjaan 1 m3 beton mutu K-225 (Ready Mix) D 015 954,110.00
14 Hasil Analisa Pekerjaan 1 m3 beton mutu K-250 (Ready Mix) D 016 992,040.00
15 Hasil Analisa Pekerjaan 1 m3 beton mutu K-300 (Ready Mix) D 017 1,029,980.00
16 Hasil Analisa Pekerjaan 1 m3 beton mutu K-350 (Ready Mix) D 018 1,067,910.00
17 Hasil Analisa Pekerjaan Pembesian 10 kg dengan Besi Beton (polos/ulir) D 019 138,950.00
18 Hasil Analisa Pekerjaan Bekisting untuk Pondasi D 020 165,660.00
19 Hasil Analisa Pekerjaan Bekisting untuk Sloop D 021 265,800.00
20 Hasil Analisa Pekerjaan Bekisting untuk Kolom D 022 326,430.00
21 Hasil Analisa Pekerjaan Bekisting untuk Balok D 023 336,340.00
22 Hasil Analisa Pekerjaan Bekisting untuk Plat lantai D 024 394,190.00
23 Hasil Analisa Pekerjaan Bekisting untuk Dinding D 025 381,890.00
24 Hasil Analisa Pekerjaan Bekisting untuk Tangga D 026 298,030.00
1. 1 M3 PEKERJAAN PONDASI (Cor Beton mutu K 175 Ready Mix Besi 150 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-175 (Ready Mix) 916,180.00
- Pembesian 15 kg dengan Besi Beton (polos/ulir) ; 15 x Hasil Analisa (D 018) 2,084,250.00
- Bekisting untuk pondasi 5 x Hasil Analisa (D 021) 828,300.00
Jumlah 3,828,730.00
2. 1 M3 PEKERJAAN SLOOP (Cor Beton mutu K 225 Ready Mix Besi 300 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-225 (Ready Mix) 954,110.00
- Pembesian 20 kg dengan Besi Beton (polos/ulir) ; 20 x Hasil Analisa (D 018) 2,779,000.00
- Bekisting untuk sloop 5 x Hasil Analisa (D 022) 1,329,000.00
Jumlah 5,062,110.00
3. 1 M3 PEKERJAAN KOLOM (Cor Beton mutu K 300 Ready Mix Besi 300 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-300 (Ready Mix) 1,029,980.00
- Pembesian 30 kg dengan Besi Beton (polos/ulir) ; 30 x Hasil Analisa (D 018) 4,168,500.00
- Bekisting untuk kolom 5 x Hasil Analisa (D 023) 1,632,150.00
Jumlah 6,830,630.00
4. 1 M3 PEKERJAAN BALOK (Cor Beton mutu K 300 Ready Mix Besi 200 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-300 (Ready Mix) 1,029,980.00
- Pembesian 20 kg dengan Besi Beton (polos/ulir) ; 20 x Hasil Analisa (D 018) 2,779,000.00
- Bekisting untuk balok 5 x Hasil Analisa (D 024) 1,681,700.00
Jumlah 5,490,680.00
5. 1 M3 PEKERJAAN PLAT LANTAI (Cor Beton mutu K 300 Ready Mix Besi 150 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-300 (Ready Mix) 1,029,980.00
- Pembesian 15 kg dengan Besi Beton (polos/ulir) ; 15 x Hasil Analisa (D 018) 2,084,250.00
- Bekisting untuk plat lantai 5 x Hasil Analisa (D 025) 1,970,950.00
Jumlah 5,085,180.00
6. 1 M3 PEKERJAAN DINDING (Cor Beton mutu K 175 Ready Mix Besi 150 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-175 (Ready Mix) 916,180.00
- Pembesian 15 kg dengan Besi Beton (polos/ulir) ; 15 x Hasil Analisa (D 018) 2,084,250.00
- Bekisting untuk dinding 5 x Hasil Analisa (D 026) 1,909,450.00
Jumlah 4,909,880.00
7. 1 M3 PEKERJAAN DINDING (Cor Beton mutu K 225 Ready Mix Besi 200 kg + Bekisting)
- Hasil Analisa Pekerjaan 1 m3 beton mutu K-225 (Ready Mix) 954,110.00
- Pembesian 20 kg dengan Besi Beton (polos/ulir) ; 20 x Hasil Analisa (D 018) 2,779,000.00
- Bekisting untuk tangga 5 x Hasil Analisa (D 027) 1,490,150.00
Jumlah 5,223,260.00
KETERANGAN :
Untuk Pekerjaan Plat Lantai Beton, Balok Beton dan Pekerjaan Beton lainnya disesuaikan dengan kondisi penempatan
Apabila terletak diatas dan membutuhkan penyangga maka ditambah Pekerjaan Stoot Werk
No Diameter Berat Besi No Diameter Berat Besi No. Diameter Berat Besi
mm Kg / m1 mm Kg / m1 mm Kg / m1
1. Kolom Praktis 12 X 12 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 12 x 12 cm = ( 1 : 0.12 : 0.12 ) = 69.44 m1
Besi 4 batang dia. 12 = 4 x 69,44 x 0,89 kg = 247.22 kg ( A)
Besi beugel dia. 8 jarak 20 mm = ( 69,44 : 0,20 ) x ( 4 x 0,12 ) x 0, 40 kg = 66.67 kg ( B )
2. Kolom praktis 15 X 15 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 15 x 15 cm = ( 1 : 0.15 : 0.15 ) = 44.44 m1
Besi 4 batang dia. 12 = 4 x 44,44 x 0,89 kg = 158.22 kg ( A)
Besi beugel dia. 8 jarak 20 mm = ( 44,44 : 0,20 ) x ( 4 x 0,15 ) x 0, 40 kg = 71.11 kg ( B )
3. Sloof praktis 15 X 20 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm
` = ( 1 : 0.15 : 0.20 ) = 33.33 m1
Besi 4 batang dia. 12 = 4 x 33,33 x 0,89 kg = 118.67 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,2 ) x 0, 40 kg = 62.22 kg ( B )
4. Kolom Beton 20 X 30 cm' pakai tulangan 4 batang dia. 12 + 2 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm = ( 1 : 0.20 : 0.30 ) = 16.67 m1
Besi 4 batang dia. 12 = 4 x 16,67 x 0,89 kg = 59.33 kg ( A)
Besi 2 batang dia. 10 = 2 x 16.67 x 0.62 kg = 73.57 kg ( B)
Besi beugel dia. 8 jarak 15 mm = ( 16,67 : 0.15 ) x (( 2 x 0.2 ) + ( 2 X 0,3 )) X 0,40 kg = 44.44 kg ( C )
NO UKURAN BESI KANAL " C " BERAT BESI BERAT PER 1 M'
1 25 x 25 x 3 x 6 mm 6.72 kg 0.56 kg
2 30 x 30 x 3 x 6 mm 8.16 kg 0.68 kg
3 40 x 40 x 3 x 6 mm 11.00 kg 0.92 kg
4 40 x 40 x 4 x 6 mm 14.50 kg 1.21 kg
5 50 x 50 x 4 x 6 mm 18.50 kg 1.54 kg
6 50 x 50 x 5 x 6 mm 22.60 kg 1.88 kg
7 60 x 60 x 5 x 6 mm 27.30 kg 2.28 kg
8 60 x 60 x 6 x 6 mm 32.52 kg 2.71 kg
9 65 x 65 x 6 x 6 mm 35.46 kg 2.96 kg
10 70 x 70 x 7 x 6 mm 44.28 kg 3.69 kg
11 75 x 75 x 6 x 6 mm 41.22 kg 3.44 kg
12 75 x 75 x 8 x 6 mm 54.18 kg 4.52 kg
13 80 x 80 x 8 x 6 mm 57.96 kg 4.83 kg
14 90 x 90 x 9 x 6 mm 73.20 kg 6.10 kg
1 3 x 16 mm 2.26 kg 0.38 kg
2 3 x 19 mm 2.68 kg 0.45 kg
3 3 x 25 mm 3.54 kg 0.59 kg
4 3 x 30 mm 4.21 kg 0.70 kg
5 4 x 19 mm 3.56 kg 0.59 kg
6 4 x 25 mm 4.68 kg 0.78 kg
7 4 x 30 mm 5.61 kg 0.94 kg
8 4 x 32 mm 5.99 kg 1.00 kg
9 4 x 38 mm 7.11 kg 1.19 kg
10 4 x 50 mm 9.36 kg 1.56 kg
11 4.5 x 19 mm 4.04 kg 0.67 kg
12 4.5 x 25 mm 5.30 kg 0.88 kg
13 4.5 x 30 mm 6.90 kg 1.15 kg
14 4.5 x 38 mm 8.13 kg 1.36 kg
15 4.5 x 50 mm 10.53 kg 1.76 kg
16 5 x 19 mm 4.50 kg 0.75 kg
17 5 x 25 mm 5.85 kg 0.98 kg
18 5 x 30 mm 7.02 kg 1.17 kg
19 5 x 32 mm 7.50 kg 1.25 kg
20 5 x 38 mm 8.90 kg 1.48 kg
21 5 x 50 mm 11.00 kg 1.83 kg
22 6 x 19 mm 5.37 kg 0.90 kg
23 6 x 25 mm 7.24 kg 1.21 kg
24 6 x 32 mm 9.22 kg 1.54 kg
25 6 x 38 mm 10.80 kg 1.80 kg
26 6 x 50 mm 13.86 kg 2.31 kg
27 6 x 65 mm 18.25 kg 3.04 kg
28 6 x 75 mm 21.06 kg 3.51 kg
29 6 x 150 mm 44.00 kg 7.33 kg
30 8 x 38 mm 14.40 kg 2.40 kg
31 9 x 38 mm 16.15 kg 2.69 kg
32 9 x 50 mm 21.00 kg 3.50 kg
33 9 x 65 mm 27.37 kg 4.56 kg
34 9 x 75 mm 31.50 kg 5.25 kg
35 9 x 100 mm 42.20 kg 7.03 kg
36 9 x 125 mm 53.50 kg 8.92 kg
37 9 x 150 mm 63.60 kg 10.60 kg
38 12 x 38 mm 21.34 kg 3.56 kg
39 12 x 50 mm 28.26 kg 4.71 kg
40 12 x 65 mm 36.50 kg 6.08 kg
41 12 x 75 mm 42.36 kg 7.06 kg
42 12 x 100 mm 56.52 kg 9.42 kg
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN LINGKUNGAN RT.07 KELURAHAN BATU TULIS
LOKASI PEKERJAA : KELURAHAN BATU TULIS
TAHUN ANGGARA : 2013
NILAI PEKERJAAN : Rp.33,985,460
Harga Harga
No Uraian Pekerjaan Volume
Satuan ( Rp ) Pekerjaan ( Rp
I PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan 0.96 m2 425,980.00 408,940.80
2 Pek. Administrasi dan Dokumentasi 1.00 ls 500,000.00 500,000.00
Jumlah
II PEKERJAAN JALAN
1 Pek. Lapisan Penetrasi makadam (Lapen) 74.25 M2 83,945.95 6,232,986.79
2 Pek. Lapisan Perekat ( tack coat ) 101.25 ltr 15,505.20 1,569,901.16
3 Pek. Hotmix (HRS) teb. 3 cm Hamparan Manual 225.00 m2 98,595.75 22,184,043.75
Jumlah
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN LINGKUNGAN RT.07 KELURAHAN BATU TULIS
LOKASI PEKERJAA : KELURAHAN BATU TULIS
TAHUN ANGGARA : 2013
NILAI PEKERJAAN : Rp.33,985,460
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN JALAN Rp
JUMLAH Rp
P.P.N 10 % Rp
JUMLAH TOTAL Rp
DIBULATKAN Rp
Terbilang : ( Tiga Puluh Tiga Juta Seratus Enam Puluh Sembilan Ribu Dua Ratus Tiga PuluhEmpat Rupiah
Jumlah
Harga (Rp)
908,940.80
29,986,931.70
JUMLAH HARGA
908,940.80
29,986,931.70
30,895,872.50
3,089,587.25
33,985,459.75
33,985,460.00
s
ogor, Desember 2012
Konsultan Perencana
CV. CIPTA SELARAS
NITA SRI SUNDARI, SH
DIREKTRIS
ENGINEERING ESTIMATE ( EE )
Harga
No Uraian Pekerjaan Volume
Satuan ( Rp )
I PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan 0.96 m2 425,980.00
2 Pek. Administrasi dan Dokumentasi 1.00 ls 500,000.00
3 Pek. Damija 200.00 m2 1,701.48
Jumlah
II PEKERJAAN JALAN
2 Pek. Lapisan Penetrasi makadam (Lapen) 110.00 M2 83,945.95
3 Pek. Lapisan Perekat ( tack coat ) 90.00 ltr 15,505.20
4 Pek. Hotmix (HRS) teb. 2 cm Hamparan Manual 200.00 m2 66,970.75
Jumlah
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
II PEKERJAAN JALAN
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang : ( -
NGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
Harga Jumlah
Pekerjaan ( Rp Harga (Rp)
408,940.80
500,000.00
340,296.00
908,940.80
9,234,054.50
1,395,467.70
13,394,150.00
24,023,672.20
JUMLAH HARGA
Rp 908,940.80
Rp 24,023,672.20
Rp 24,932,613.00
Rp 2,493,261.30
Rp 27,425,874.30
Rp 27,425,874.00
- )
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN LINGKUNGAN RT.02 RW. 14 KELURAHAN BONDONGAN
LOKASI PEKERJAAN : KELURAHAN BONDONGAN
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.41,749,338
Harga Harga
No Uraian Pekerjaan Volume
Satuan ( Rp ) Pekerjaan ( Rp
I PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan 0.96 m2 425,980.00 478,512.00
2 Pek. Administrasi dan Dokumentasi 1.00 ls 500,000.00 500,000.00
Jumlah
II PEKERJAAN JALAN
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN LINGKUNGAN RT.02 RW. 14 KELURAHAN BONDONGAN
LOKASI PEKERJAAN : KELURAHAN BONDONGAN
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.41,749,338
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN JALAN Rp
JUMLAH Rp
P.P.N 10 % Rp
JUMLAH TOTAL Rp
DIBULATKAN Rp
Terbilang : ( -
Jumlah
Harga (Rp)
978,512.00
36,975,432.04
JUMLAH HARGA
978,512.00
36,975,432.04
37,953,944.04
3,795,394.40
41,749,338.44
41,749,338.00
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELAT
PEKERJAAN : PERBAIKAN JALAN LINGKUNGAN RT.05 RW. 05 KELURAHAN BONDONGAN
LOKASI PEKERJAAN : KELURAHAN BONDONGAN
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.40,035,571
Harga
No Uraian Pekerjaan Volume
Satuan ( Rp )
I PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan 0.96 m2 425,980.00
2 Pek. Administrasi dan Dokumentasi 1.00 ls 500,000.00
Jumlah
II PEKERJAAN JALAN
1 Pek. Lapisan Penetrasi makadam (Lapen) 107.50 M2 83,945.95
2 Pek. Lapisan Perekat ( tack coat ) 112.50 ltr 15,505.20
3 Pek. Hotmix (HRS) teb. 3 cm Hamparan Manual 250.00 m2 98,595.75
Jumlah
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELAT
PEKERJAAN : PERBAIKAN JALAN LINGKUNGAN RT.05 RW. 05 KELURAHAN BONDONGAN
LOKASI PEKERJAAN : KELURAHAN BONDONGAN
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.40,035,571
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
II PEKERJAAN JALAN
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang : ( -
KUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
AN BONDONGAN
Harga Jumlah
Pekerjaan ( Rp Harga (Rp)
478,512.00
500,000.00
978,512.00
9,024,189.63
1,744,334.63
24,648,937.50
35,417,461.75
JUMLAH HARGA
Rp 978,512.00
Rp 35,417,461.75
Rp 36,395,973.75
Rp 3,639,597.38
Rp 40,035,571.13
Rp 40,035,571.00
- )
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN LINGKUNGAN RT.01 RW. 06 KELURAHAN BONDONGAN
LOKASI PEKERJAAN : KELURAHAN BONDONGAN
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.40,000,159
Harga Harga
No Uraian Pekerjaan Volume
Satuan ( Rp ) Pekerjaan ( Rp
I PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan 0.96 m2 425,980.00 478,512.00
2 Pek. Administrasi dan Dokumentasi 1.00 ls 500,000.00 500,000.00
Jumlah
II PEKERJAAN JALAN
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN LINGKUNGAN RT.01 RW. 06 KELURAHAN BONDONGAN
LOKASI PEKERJAAN : KELURAHAN BONDONGAN
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.40,000,159
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN JALAN Rp
JUMLAH Rp
P.P.N 10 % Rp
JUMLAH TOTAL Rp
DIBULATKAN Rp
Terbilang : TIGA(PULUH SEMBILAN JUTA DELAPAN RATUS SEMBILAN PULUH RIBU TIGA RATUS LIMA PULUH LIMA RUPIAH
Jumlah
Harga (Rp)
978,512.00
35,385,269.04
JUMLAH HARGA
978,512.00
35,385,269.04
36,363,781.04
3,636,378.10
40,000,159.14
40,000,159.00
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN KOMPLEK MINABHAKTI RT.06 RW. 03 KELURAHAN CIKARET
LOKASI PEKERJAAN : KELURAHAN CIKARET
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.34,577,758
Harga Harga
No Uraian Pekerjaan Volume
Satuan ( Rp ) Pekerjaan ( Rp
I PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan 0.96 m2 425,980.00 478,512.00
2 Pek. Administrasi dan Dokumentasi 1.00 ls 500,000.00 500,000.00
Jumlah
II PEKERJAAN JALAN
1 Pek. Lapisan Penetrasi makadam (Lapen) 98.70 M2 83,945.95 8,285,465.27
2 Pek. Lapisan Perekat ( tack coat ) 94.50 ltr 15,505.20 1,465,241.09
3 Pek. Hotmix (HRS) teb. 3 cm Hamparan Manual 210.00 m2 98,595.75 20,705,107.50
Jumlah
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN KOMPLEK MINABHAKTI RT.06 RW. 03 KELURAHAN CIKARET
LOKASI PEKERJAAN : KELURAHAN CIKARET
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.34,577,758
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN JALAN Rp
JUMLAH Rp
P.P.N 10 % Rp
JUMLAH TOTAL Rp
DIBULATKAN Rp
Terbilang : ( -
Jumlah
Harga (Rp)
978,512.00
30,455,813.85
JUMLAH HARGA
978,512.00
30,455,813.85
31,434,325.85
3,143,432.59
34,577,758.44
34,577,758.00
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN SETAPAK RT.05 RW. 10 KELURAHAN CIKARET
LOKASI PEKERJAAN : KELURAHAN CIKARET
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.34,020,237
Harga Harga
No Uraian Pekerjaan Volume
Satuan ( Rp ) Pekerjaan ( Rp
I PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan 0.96 m2 425,980.00 478,512.00
2 Pek. Administrasi dan Dokumentasi 1.00 ls 500,000.00 500,000.00
Jumlah
II PEKERJAAN JALAN
1 Pek. Lapisan Perekat ( tack coat ) 182.25 ltr 15,505.20 2,825,822.09
2 Pek. Hotmix (HRS) teb. 2 cm Hamparan Manual 405.00 m2 66,970.75 27,123,153.75
Jumlah
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN SETAPAK RT.05 RW. 10 KELURAHAN CIKARET
LOKASI PEKERJAAN : KELURAHAN CIKARET
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.34,020,237
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN JALAN Rp
JUMLAH Rp
P.P.N 10 % Rp
JUMLAH TOTAL Rp
DIBULATKAN Rp
Terbilang : ( -
Jumlah
Harga (Rp)
978,512.00
29,948,975.84
JUMLAH HARGA
978,512.00
29,948,975.84
30,927,487.84
3,092,748.78
34,020,236.63
34,020,237.00
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN SETAPAK RW. 09 KELURAHAN EMPANG
LOKASI PEKERJAAN : KELURAHAN EMPANG
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.40,715,422
Harga Harga
No Uraian Pekerjaan Volume
Satuan ( Rp ) Pekerjaan ( Rp
I PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan 0.96 m2 425,980.00 478,512.00
2 Pek. Administrasi dan Dokumentasi 1.00 ls 500,000.00 500,000.00
Jumlah
II PEKERJAAN JALAN
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN SETAPAK RW. 09 KELURAHAN EMPANG
LOKASI PEKERJAAN : KELURAHAN EMPANG
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.40,715,422
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN JALAN Rp
JUMLAH Rp
P.P.N 10 % Rp
JUMLAH TOTAL Rp
DIBULATKAN Rp
Terbilang : ( -
Jumlah
Harga (Rp)
978,512.00
36,035,508.30
JUMLAH HARGA
978,512.00
36,035,508.30
37,014,020.30
3,701,402.03
40,715,422.33
40,715,422.00
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN SETAPAK RT.03,04 RW. 05 KELURAHAN EMPANG
LOKASI PEKERJAAN : KELURAHAN EMPANG
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.29,814,681
Harga Harga
No Uraian Pekerjaan Volume
Satuan ( Rp ) Pekerjaan ( Rp
I PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan 0.96 m2 425,980.00 478,512.00
2 Pek. Administrasi dan Dokumentasi 1.00 ls 500,000.00 500,000.00
Jumlah
II PEKERJAAN JALAN
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN SETAPAK RT.03,04 RW. 05 KELURAHAN EMPANG
LOKASI PEKERJAAN : KELURAHAN EMPANG
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.29,814,681
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN JALAN Rp
JUMLAH Rp
P.P.N 10 % Rp
JUMLAH TOTAL Rp
DIBULATKAN Rp
Terbilang : ( -
Jumlah
Harga (Rp)
978,512.00
26,125,743.52
JUMLAH HARGA
978,512.00
26,125,743.52
27,104,255.52
2,710,425.55
29,814,681.07
29,814,681.00
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN SETAPAK RT.02 RW. 03 KELURAHAN GENTENG
LOKASI PEKERJAAN : KELURAHAN GENTENG
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.33,448,261
Harga Harga
No Uraian Pekerjaan Volume
Satuan ( Rp ) Pekerjaan ( Rp
I PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan 0.96 m2 425,980.00 478,512.00
2 Pek. Administrasi dan Dokumentasi 1.00 ls 500,000.00 500,000.00
Jumlah
II PEKERJAAN JALAN
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN SETAPAK RT.02 RW. 03 KELURAHAN GENTENG
LOKASI PEKERJAAN : KELURAHAN GENTENG
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.33,448,261
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN JALAN Rp
JUMLAH Rp
P.P.N 10 % Rp
JUMLAH TOTAL Rp
DIBULATKAN Rp
Terbilang : ( -
Jumlah
Harga (Rp)
978,512.00
29,428,998.45
JUMLAH HARGA
978,512.00
29,428,998.45
30,407,510.45
3,040,751.04
33,448,261.49
33,448,261.00
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN SETAPAK RT.02 RW. 08 KELURAHAN MULYAHARJA
LOKASI PEKERJAAN : KELURAHAN MULYAHARJA
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.27,502,403
Harga Harga
No Uraian Pekerjaan Volume
Satuan ( Rp ) Pekerjaan ( Rp
I PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan 0.96 m2 425,980.00 478,512.00
2 Pek. Administrasi dan Dokumentasi 1.00 ls 500,000.00 500,000.00
Jumlah
II PEKERJAAN JALAN
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN SETAPAK RT.02 RW. 08 KELURAHAN MULYAHARJA
LOKASI PEKERJAAN : KELURAHAN MULYAHARJA
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.27,502,403
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN JALAN Rp
JUMLAH Rp
P.P.N 10 % Rp
JUMLAH TOTAL Rp
DIBULATKAN Rp
Terbilang : ( Tiga Puluh Empat Juta Delapan Puluh Lima Ribu Empat Ratus Sembilan PuluhTiga Rupiah
Jumlah
Harga (Rp)
978,512.00
24,023,672.20
JUMLAH HARGA
978,512.00
24,023,672.20
25,002,184.20
2,500,218.42
27,502,402.62
27,502,403.00
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN RT.02 RW. 07 KELURAHAN PAMOYANAN
LOKASI PEKERJAAN : KELURAHAN PAMOYANAN
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.49,968,499
Harga Harga
No Uraian Pekerjaan Volume
Satuan ( Rp ) Pekerjaan ( Rp
I PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan 0.96 m2 425,980.00 478,512.00
2 Pek. Administrasi dan Dokumentasi 1.00 ls 500,000.00 500,000.00
Jumlah
II PEKERJAAN JALAN
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN RT.02 RW. 07 KELURAHAN PAMOYANAN
LOKASI PEKERJAAN : KELURAHAN PAMOYANAN
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.49,968,499
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN JALAN Rp
JUMLAH Rp
P.P.N 10 % Rp
JUMLAH TOTAL Rp
DIBULATKAN Rp
Terbilang : ( Dua Puluh Tujuh Juta Tujuh Ratus Dua Puluh Empat Ribu Seratus Sebelas Rupiah
Jumlah
Harga (Rp)
978,512.00
44,447,396.57
JUMLAH HARGA
978,512.00
44,447,396.57
45,425,908.57
4,542,590.86
49,968,499.42
49,968,499.00
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN LINGKUNGAN RW. 07 DAN RW. 09 KELURAHAN RANCAMAYA
LOKASI PEKERJAAN : KELURAHAN RANCAMAYA
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.34,992,927
Harga
No Uraian Pekerjaan Volume
Satuan ( Rp )
I PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan 0.96 m2 425,980.00
2 Pek. Administrasi dan Dokumentasi 1.00 ls 500,000.00
Jumlah
II PEKERJAAN JALAN
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN LINGKUNGAN RW. 07 DAN RW. 09 KELURAHAN RANCAMAYA
LOKASI PEKERJAAN : KELURAHAN RANCAMAYA
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.34,992,927
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
II PEKERJAAN JALAN
JUMLAH
P.P.N 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang : ( Tiga Puluh Empat Juta Empat Ratus Delapan Puluh Delapan Ribu Dua Ratus Tujuh Belas Rupiah
PERMUKIMAN KEC. BOGOR SELATAN
Harga Jumlah
Pekerjaan ( Rp Harga (Rp)
478,512.00
500,000.00
978,512.00
1,800,640.63
1,918,768.09
27,113,831.25
30,833,239.97
JUMLAH HARGA
Rp 978,512.00
Rp 30,833,239.97
Rp 31,811,751.97
Rp 3,181,175.20
Rp 34,992,927.16
Rp 34,992,927.00
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN KE TPU DAN JEMBATAN KP. LEGOK MUNCANG RT. 03 RW. 05 KELURAHAN RANCAMAYA
LOKASI PEKERJAAN : KELURAHAN RANCAMAYA
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.38,632,845
Harga Harga
No Uraian Pekerjaan Volume
Satuan ( Rp ) Pekerjaan ( Rp
I PEKERJAAN PERSIAPAN
1 Pek. Papan nama kegiatan 0.96 m2 425,980.00 478,512.00
2 Pek. Administrasi dan Dokumentasi 1.00 ls 500,000.00 500,000.00
Jumlah
II PEKERJAAN JALAN
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN/PERBAIKAN SARANA PRASARANA LINGKUNGAN PERUMAHAN PERMUKIMAN KEC. BOGOR SELATAN
PEKERJAAN : PERBAIKAN JALAN KE TPU DAN JEMBATAN KP. LEGOK MUNCANG RT. 03 RW. 05 KELURAHAN RANCAMAYA
LOKASI PEKERJAAN : KELURAHAN RANCAMAYA
TAHUN ANGGARAN : 2013
NILAI PEKERJAAN : Rp.38,632,845
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN JALAN Rp
JUMLAH Rp
P.P.N 10 % Rp
JUMLAH TOTAL Rp
DIBULATKAN Rp
Terbilang : ( -
Jumlah
Harga (Rp)
978,512.00
34,142,256.23
C. BOGOR SELATAN
JUMLAH HARGA
978,512.00
34,142,256.23
35,120,768.23
3,512,076.82
38,632,845.05
38,632,845.00
- )
r, Desember 2012
sultan Perencana
. CIPTA SELARAS
A SRI SUNDARI, SH
DIREKTRIS