Anda di halaman 1dari 31

ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pekerjaan Drainase Kampung Tengah


Lokasi : Jorong Kampung Tengah
Nagari : Simalidu
Kecamatan : Koto Salak

Harga Satuan Jumlah Upah


No. Uraian Jumlah Bahan (Rp) Total Jumlah
(Rp) (Rp)

a b c d e f

1 Pekerjaan Galian Saluran /m3


0.6000 OH Pekerja 85,000.00 51,000.00
51,000.00 - 51,000.00
2 Pasangan Pasir Urug / m3
0.3000 OH Pekerja 85,000.00 25,500.00
1.2000 m3 Pasir Urug 75,000.00 90,000.00
25,500.00 90,000.00 115,500.00

3 Pasangan Batu Kali Drainase /m3


1.5000 OH Pekerja 85,000.00 127,500.00
0.7500 OH Tukang kayu 105,000.00 78,750.00
1.2000 M3 Batu Kali 165,000.00 198,000.00
163.00 Kg Semen Pc ( 50 Kg) 1,340.00 218,420.00
0.5200 M3 Pasir Pasang 140,000.00 72,800.00
206,250.00 489,220.00 695,470.00
4 Pekerjaan Cor Lantai Drainase /m3
1.65 OH Pekerja 85,000.00 140,250.00
0.275 OH Tukang batu 105,000.00 28,875.00
0.52 M3 Pasir Beton 140,000.00 72,800.00
7.04 Zak Semen Pc ( 50 Kg) 67,000.00 471,680.00
0.57 M3 Koral Beton 153,000.00 87,210.00
169,125.00 631,690.00 800,815.00
5 Pekerjaan Acian Permukaan /m2
0.07 OH Pekerja 85,000.00 5,950.00
0.07 OH Tukang batu 105,000.00 7,350.00
2.5 Kg Semen Pc ( 50 Kg) 1,340.00 3,350.00
13,300.00 3,350.00 16,650.00

Dibuat Oleh
Diketahui Oleh: Tim Pelaksana Kegiatan
Wali Nagari Simalidu Jorong Kampung Baru
Kec. Koto Salak

Drs. Ismail. Y (……………………………………….)


Ketua TPK
REKAPITULASI RENCANA ANGGARAN BIAYA
Kegiatan : Peningkatan Jalan Korong Galoro
Lokasi : Korong Galoro
Nagari : Tandikat
Kecamatan : Patamuan

Harga Satuan JUMLAH


No. Uraian Volume Satuan
(Rp) HARGA
a b c d e f

I PEKERJAAN PERSIAPAN
1 Pembersihan Badan Jalan 150.00 m2 51,000.00 Rp 7,650,000.00
II PEKERJAAN BETON JALAN
1 Pasangan Bekisting Beton Err:509 m2 Err:509
2 Pekerjaan Cor Lantai Drainase /m3 2.25 M3 800,815.00 Rp 2,094,000.00
2 Dokumentasi, Laporan & Penggandaan 1.00 Ls 140,000.00
3 Biaya musyawarah Korong 1.00 Ls 450,000.00
4 Perencanaan Kegiatan 1.00 Ls 200,000.00
II ALAT
1 Cangkul 3.00 bh 70,000.00 Rp 210,000.00
2 Gerobak Dorong 2.00 bh 370,000.00 Rp 740,000.00
3 Sikop 3.00 bh 75,000.00 Rp 225,000.00

TOTAL BIAYA FISIK Err:509


Operasional Kegiatan 6% Rp 5,900,000.00
JUMLAH TOTAL Err:509
TERBILANG : DUA PULUH SEMBILAN JUTA RUPIAH
Lubuak Aro Oktober 2015
Diketahui Oleh: Dibuat Oleh
Wali Nagari Tandikat Tim Pelaksana Kegiatan
Kec. Patamuan Nagari Tandikat

ZAHIDIN ARSIL, S. Ag
Ketua TPK
LEMBARAN ACUAN

Lokasi : JORONG KAMBANG BARU No RAB: 01


Kegiatan : PEMB. DRAINASE JR. KAMBANG BARU Jenis Kegiatan: Pekerjaan Galian Saluran
Nagari : SUNGAI RUMBAI TIMUR Ukuran : 150 m3
Kecamatan : SUNGAI RUMBAI

A. DASAR PERHITUNGAN
Drainase
Panjang Galian = 125.00 m
Lebar Galian = 1.20 m
Dalam Galian = 1.00 m

Volume Galian = 150.00 m3

B UPAH Indeks Vol Jumlah Sat


Pekerja = 0.60 x 150.00 = 91.00 OH

DETAIL RENCANA ANGGARAN BIAYA


TOTAL Satuan Harga Satuan Jumlah Dana
No Uraian
( Rp ) ( Rp )
I. BAHAN
1 Rp -
2 Rp -
3 Rp -
SUB TOTAL I -
II. ALAT
1 Rp -
2 Rp -
SUB TOTAL II -
III. UPAH
1 Pekerja 91.00 OH 85,000 Rp 7,735,000
2 Rp -
SUB TOTAL III 7,735,000.00
JUMLAH TOTAL 7,735,000.00
Diketahui Oleh: Dibuat Oleh
Wali NagariKOTO SALAK Tim Pelaksana Kegiatan
Kec. Koto Salak Jorong SUNGAI KLUKUP
Drs. Ismail. Y (…………………………….)
LEMBARAN ACUAN

Lokasi : JORONG KAMBANG BARU No RAB: 02

Kegiatan : PEMB. DRAINASE JR. KAMBANG BARU Jenis Kegiatan: Pemasangan Bowplank
Nagari : SUNGAI RUMBAI TIMUR Ukuran : ### 125 m
Kecamatan : SUNGAI RUMBAI

A. DASAR PERHITUNGAN

Panjang area = 125.00 m


Lebar Area = 1.00 m
Panjang Bowplank = 125.00 m

B BAHAN Indeks Vol Jumlah Sat


Papan Bekisting = 0.0070 x 125 = 0.88 M3 2x pakai
Tiang Pancang 5/7 = 0.0060 x 125 = 0.75 M3 2x pakai
Paku = 0.02 x 125 = 3.00 Kg

C. UPAH Indeks Vol Jumlah Sat


Pekerja = 0.10 x 125 = 13.00 OH
Tukang = 0.01 x 125 = 2.00 OH

DETAIL RENCANA ANGGARAN BIAYA


TOTAL Satuan Harga Satuan Jumlah Dana
No Uraian
( Rp ) ( Rp )
I. BAHAN
1 Papan Bekisting 0.438 m3 1,680,000 Rp 735,000
2 Tiang Pancang 5/7 0.375 m3 1,680,000 Rp 630,000
3 Paku 3.000 kg 16,000 Rp 48,000
SUB TOTAL I 1,413,000
II. ALAT
1 Rp -
2 Rp -
SUB TOTAL II -
III. UPAH
1 Pekerja 13.00 OH 85,000 Rp 1,105,000
2 Tukang 2.00 OH 105,000 Rp 210,000
SUB TOTAL III 1,315,000.00
JUMLAH TOTAL 2,728,000.00
Ketua TPK
LEMBARAN ACUAN

Lokasi : JORONG KAMBANG BARU No RAB: 03


Kegiatan : PEMB. DRAINASE JR. KAMBANG BARU Jenis Kegiatan: Pekerjaan Pasangan Batu Kali
Nagari : SUNGAI RUMBAI TIMUR Ukuran : 56.25 m3
Kecamatan : SUNGAI RUMBAI

A. DASAR PERHITUNGAN
a = 0.25 m
b = 0.75 m
c = 0.40 m
d = 0.30 m

Luas Penampang = 0.225 x 2 = 0.45 m2


Panjang Drainase = 125.00 m
Volume batu kali = Luas Penampang x Panjang Drainase
= 0.45 x 125 = 56.25 m3
B BAHAN Indeks Vol Jumlah Sat
Batu Kali = 1.20 x 56.25 = 67.00 M3
Semen Pc ( 50 Kg) = 202.00 x 56.25 = 11,362.00 Kg
Semen Pc ( 50 Kg) = 11,362 : 50.00 = 227.00 Zak
Pasir Pasang = 0.52 x 56.25 = 29.00 M3
C UPAH
Pekerja = 1.50 x 56.25 = 84.00 OH
Tukang batu = 0.75 x 56.25 = 43.00 OH

DETAIL RENCANA ANGGARAN BIAYA


TOTAL Satuan Harga Satuan Jumlah Dana
No Uraian
( Rp ) ( Rp )
I. BAHAN
1 Batu Kali 67.00 M3 176,000 Rp 11,792,000
2 Semen Pc ( 50 Kg) 227.00 Zak 69,000 Rp 15,663,000
3 Pasir Pasang 29.00 M3 147,000 4,263,000
SUB TOTAL I 31,718,000
II. ALAT
1 Benang/Tali 1 Ls 22,000 Rp 22,000
2 Keranjang 4 bh 20,000 Rp 80,000
3 Gerobak Dorong 1 bh 385,000 Rp 385,000
4 Cangkul 2 bh 60,000 Rp 120,000
SUB TOTAL II 607,000
III. UPAH
1 Pekerja 84.00 OH 85,000 Rp 7,140,000
2 Tukang batu 43.00 OH 105,000 Rp 4,515,000
SUB TOTAL III 11,655,000.00
JUMLAH TOTAL 43,980,000.00
LEMBARAN ACUAN

Lokasi : JORONG KAMBANG BARU No RAB: 04


Kegiatan : PEMB. DRAINASE JR. KAMBANG BARU Jenis Kegiatan: Pekerjaan Cor Lantai Drainase
Nagari : SUNGAI RUMBAI TIMUR Ukuran : 2.25 m3
Kecamatan : SUNGAI RUMBAI

A. DASAR PERHITUNGAN
Panjang Drainase = 125.00 m 0.018 #REF!
Lebar Lantai = 0.30 m
Tebal Lantai = 0.06 m Volume = 2.25 m3
Material Berat Berat Jenis
Semen 352 Kg 7.04
Pasir 731 kg 1,400 kg/m3 0.52
Kerikil 1,031 kg 1,800 kg/m3 0.57
B. BAHAN Indeks Vol Jumlah Sat
Pasir Beton = 0.520 x 2.25 = 2.00 M3
Semen Pc ( 50 Kg) = 5.400 x 2.25 = 13.00 Zak
Koral Beton = 0.570 x 2.25 = 2.00 M3
C. UPAH Indeks Vol Jumlah Sat
Pekerja = 1.650 x 2.25 = 4.00 OH
Tukang batu = 0.275 x 2.25 = 1.00 OH

DETAIL RENCANA ANGGARAN BIAYA


TOTAL Satuan Harga Satuan Jumlah Dana
No Uraian
( Rp ) ( Rp )
I. BAHAN
1 Pasir Beton 2.00 M3 178,000 Rp 356,000
2 Semen Pc ( 50 Kg) 13.00 Zak 69,000 Rp 897,000
3 Koral Beton 2.00 M3 198,000 Rp 396,000
SUB TOTAL I 1,649,000
II. ALAT
1 Rp -
2 Rp -
3 Rp -
4 Rp -
SUB TOTAL II -
III. UPAH
1 Pekerja 4.00 OH 85,000 Rp 340,000
2 Tukang batu 1.00 OH 105,000 Rp 105,000
SUB TOTAL III 445,000.00
JUMLAH TOTAL 2,094,000.00
Diketahui Oleh: Dibuat Oleh
Wali NagariKOTO SALAK Tim Pelaksana Kegiatan
Kec. Koto Salak Jorong SUNGAI KLUKUP
LEMBARAN ACUAN

Lokasi : JORONG KAMBANG BARU No RAB: 05


Kegiatan : PEMB. DRAINASE JR. KAMBANG BARU Jenis Kegiatan: Pekerjaan Plester + Acian
Nagari : SUNGAI RUMBAI TIMUR Ukuran : 149.6 M2
Kecamatan : SUNGAI RUMBAI

A. DASAR PERHITUNGAN

Lebar Permukaan = 1.15 m 1.150


Panjang Permukaan = 125.00 m
Luas Acian = 143.75 m2
Luas Acian Box inlet = 5.80 m2 Totall = 149.55 m2
Analisa Acian/M2
B1 BAHAN Indeks Vol Jumlah Sat
Semen Pc ( 50 Kg) = 3.20 x 149.55 = 478.00 Kg
Semen Pc ( 50 Kg) = 478.00 : 50.00 = 9.00 zak
Analisa Plester 1:2 /M2
Semen Pc ( 50 Kg) = 10.20 x 149.55 = 1,525.00 Kg
Semen Pc ( 50 Kg) = 1,525 : 50.00 = 30.00 zak
Pasir Pasang = 0.02 x 149.55 = 2.00 m3
C. UPAH Indeks Vol Jumlah Sat
Plester
Pekerja = 0.30 x 149.55 = 43.00 OH
Tukang = 0.15 x 149.55 = 21.00 OH
Acian
Pekerja = 0.18 x 149.55 = 25.00 OH
Tukang = 0.10 x 149.55 = 13.00 OH

DETAIL RENCANA ANGGARAN BIAYA


TOTAL Satuan Harga Satuan Jumlah Dana
No Uraian
( Rp ) ( Rp )
I. BAHAN
1 Semen Pc ( 50 Kg) 39.00 Zak 69,000 Rp 2,691,000
2 Pasir Pasang 2.00 m3 147,000 Rp 294,000
3 Rp -
SUB TOTAL I 2,985,000
II. ALAT
1 Rp -
2 Rp -
3 Rp -
SUB TOTAL II -
III. UPAH
1 Pekerja 68.00 OH 85,000 Rp 5,780,000
2 Tukang 34.00 OH 105,000 Rp 3,570,000
SUB TOTAL III 9,350,000.00
JUMLAH TOTAL 12,335,000.00
Diketahui Oleh: Dibuat Oleh
Drs. Ismail. Y (…………………………….)
LEMBARAN ACUAN

Lokasi : JORONG KAMBANG BARU No RAB: 06


Kegiatan : PEMB. DRAINASE JR. KAMBANG BARU Jenis Kegiatan: Box inlet
Nagari : SUNGAI RUMBAI TIMUR Ukuran : 1.56 m3
Kecamatan : SUNGAI RUMBAI

A. DASAR PERHITUNGAN
Box Inlet
Tinggi Box = 1.20 m
Lebar Atas Pas.Batu = 0.25 m
Lebar Bawah = 0.40 m
Volume = 0.39 m3 x 4
= 1.56 m3
B BAHAN Indeks Vol Jumlah Sat
Batu Kali = 1.20 x 1.56 = 2.00 m3
Semen Pc ( 50 Kg) = 202.00 x 1.56 = 315.00 kg
Semen Pc ( 50 Kg) = 315.00 : 50 = 6.00 zak
Pasir Pasang = 0.52 x 1.56 = 0.81 m3
C. UPAH Indeks Vol Jumlah Sat
Pekerja = 1.50 x 1.56 = 3.00 OH
Tukang = 0.75 x 1.56 = 2.00 OH

DETAIL RENCANA ANGGARAN BIAYA


TOTAL Satuan Harga Satuan Jumlah Dana
No Uraian
( Rp ) ( Rp )
I. BAHAN
1 Batu Kali 2.00 m3 176,000 Rp 352,000
2 Semen Pc ( 50 Kg) 6.00 zak 69,000 Rp 414,000
3 Pasir Pasang 1.00 m3 147,000 Rp 147,000
SUB TOTAL I 913,000
II. ALAT
1 Rp -
2 Rp -
3 Rp -
SUB TOTAL II -
III. UPAH
1 Pekerja 3.00 OH 85,000 Rp 255,000
2 Tukang 2.00 OH 105,000 Rp 210,000
SUB TOTAL III 465,000.00
JUMLAH TOTAL 1,378,000.00
JUMLAH TOTAL 1,378,000.00
LEMBARAN ACUAN

Lokasi : JORONG PASAR BARU No RAB: 01


Kegiatan : PEMB. PLAT DUIKER JR. PASAR BARU Jenis Kegiatan: Pekerjaan Galian Saluran
Nagari : SUNGAI RUMBAI Ukuran : 4.80 m3
Kecamatan : SUNGAI RUMBAI

A. DASAR PERHITUNGAN
Drainase
Panjang Galian = 4.00 m
Lebar Galian = 1.20 m
Dalam Galian = 1.00 m

Volume Galian = 4.80 m3

B UPAH Indeks Vol Jumlah Sat


Pekerja = 0.75 x 4.80 = 3.00 OH

DETAIL RENCANA ANGGARAN BIAYA


TOTAL Satuan Harga Satuan Jumlah Dana
No Uraian
( Rp ) ( Rp )
I. BAHAN
1 Rp -
2 Rp -
3 Rp -
SUB TOTAL I -
II. ALAT
1 Rp -
2 Rp -
SUB TOTAL II -
III. UPAH
1 Pekerja 3.00 OH 85,000 Rp 255,000
2 Rp -
SUB TOTAL III 255,000.00
JUMLAH TOTAL 255,000.00
Diketahui Oleh: Dibuat Oleh
Wali NagariKOTO SALAK Tim Pelaksana Kegiatan
Kec. Koto Salak Jorong SUNGAI KLUKUP

Drs. Ismail. Y (…………………………….)


Ketua TPK
LEMBARAN ACUAN

Lokasi : JORONG PASAR BARU No RAB: 02


Kegiatan : PEMB. PLAT DUIKER JR. PASAR BARU Jenis Kegiatan: Pekerjaan Pasangan Batu Kali
Nagari : SUNGAI RUMBAI Ukuran : 2.60 m3
Kecamatan : SUNGAI RUMBAI

A. DASAR PERHITUNGAN
a = 0.25 m
b = 1.00 m
c = 0.40 m
d = 0.60 m

Luas Penampang = 0.33 x 2 = 0.65 m2


Panjang Drainase = 4.00 m
Volume batu kali = Luas Penampang x Panjang Drainase
= 0.65 x 4 = 2.60 m3
B BAHAN Indeks Vol Jumlah Sat
Batu Kali = 1.20 x 2.60 = 3.00 M3
Semen Pc ( 50 Kg) = 202.00 x 2.60 = 525.00 Kg
Semen Pc ( 50 Kg) = 525 : 50.00 = 11.00 Zak
Pasir Pasang = 0.52 x 2.60 = 2.00 M3
C UPAH
Pekerja = 1.50 x 2.60 = 3.00 OH
Tukang batu = 0.75 x 2.60 = 2.00 OH

DETAIL RENCANA ANGGARAN BIAYA


TOTAL Satuan Harga Satuan Jumlah Dana
No Uraian
( Rp ) ( Rp )
I. BAHAN
1 Batu Kali 3.00 M3 176,000 Rp 528,000
2 Semen Pc ( 50 Kg) 11.00 Zak 69,000 Rp 759,000
3 Pasir Pasang 2.00 M3 147,000 294,000
SUB TOTAL I 1,581,000
II. ALAT
1 Rp -
2 Rp -
3 Rp -
4 Rp -
SUB TOTAL II -
III. UPAH
1 Pekerja 3.00 OH 85,000 Rp 255,000
2 Tukang batu 2.00 OH 105,000 Rp 210,000
SUB TOTAL III 465,000.00
JUMLAH TOTAL 2,046,000.00
LEMBARAN ACUAN

Lokasi : JORONG PULAU MAINAN No RAB: 03


Kegiatan : PEMBANGUNAN DRAINASE PULAU MAINAN Jenis Kegiatan: Pekerjaan Cor Lantai Drainase
Nagari : PULAU MAINAN Ukuran : 0.14 m3
Kecamatan : KOTO SALAK

A. DASAR PERHITUNGAN
Panjang Drainase = 4.00 m 0.036 #REF!
Lebar Lantai = 0.60 m
Tebal Lantai = 0.06 m Volume = 0.14 m3
Material Berat Berat Jenis
Semen 352 Kg 7.04
Pasir 731 kg 1,400 kg/m3 0.52
Kerikil 1,031 kg 1,800 kg/m3 0.57
B. BAHAN Indeks Vol Jumlah Sat
Pasir Beton = 0.520 x 0.14 = 1.00 M3
Semen Pc ( 50 Kg) = 5.400 x 0.14 = 1.00 Zak
Koral Beton = 0.570 x 0.14 = 1.00 M3
C. UPAH Indeks Vol Jumlah Sat
Pekerja = 1.650 x 0.14 = 1.00 OH
Tukang batu = 0.275 x 0.14 = 1.00 OH

DETAIL RENCANA ANGGARAN BIAYA


TOTAL Satuan Harga Satuan Jumlah Dana
No Uraian
( Rp ) ( Rp )
I. BAHAN
1 Pasir Beton 1.00 M3 195,000 Rp 195,000
2 Semen Pc ( 50 Kg) 1.00 Zak 70,000 Rp 70,000
3 Koral Beton 1.00 M3 160,700 Rp 160,700
SUB TOTAL I 425,700
II. ALAT
4 Rp -
5 Rp -
6 Rp -
7 Rp -
SUB TOTAL II -
III. UPAH
1 Pekerja 4.00 OH 85,000 Rp 340,000
2 Tukang batu 1.00 OH 105,000 Rp 105,000
SUB TOTAL III 445,000.00
JUMLAH TOTAL 870,700.00
Diketahui Oleh: Dibuat Oleh
Wali NagariKOTO SALAK Tim Pelaksana Kegiatan
Kec. Koto Salak Jorong SUNGAI KLUKUP

LEMBARAN ACUAN

Lokasi : JORONG PULAU MAINAN No RAB: 04


Kegiatan : PEMBANGUNAN DRAINASE PULAU MAINAN Jenis Kegiatan: Pekerjaan Plester + Acian
Nagari : PULAU MAINAN Ukuran : 9 M2
Kecamatan : KOTO SALAK

A. DASAR PERHITUNGAN
Lebar Permukaan = 2.30 m
Panjang Permukaan = 4.00 m
Luas Acian = 9.20 m2

Analisa Acian/M2
B1 BAHAN Indeks Vol Jumlah Sat
Semen Pc ( 50 Kg) = 3.20 x 9.20 = 29.00 Kg
Semen Pc ( 50 Kg) = 29.00 : 50.00 = 1.00 zak
Analisa Plester 1:2 /M2
Semen Pc ( 50 Kg) = 10.20 x 9.20 = 93.00 Kg
Semen Pc ( 50 Kg) = 93 : 50.00 = 2.00 zak
Pasir Pasang = 0.02 x 9.20 = 3.00 m3
C. UPAH Indeks Vol Jumlah Sat
Plester
Pekerja = 0.30 x 9.20 = 2.00 OH
Tukang = 0.15 x 9.20 = - OH
Acian
Pekerja = 0.20 x 9.20 = 1.00 OH
Tukang = 0.10 x 9.20 = - OH

DETAIL RENCANA ANGGARAN BIAYA


TOTAL Satuan Harga Satuan Jumlah Dana
No Uraian
( Rp ) ( Rp )
I. BAHAN
1 Semen Pc ( 50 Kg) 3.00 Zak 70,000 Rp 210,000
2 Pasir Pasang 3.00 m3 147,000 Rp 441,000
3 Rp -
SUB TOTAL I 651,000
II. ALAT
1 Rp -
2 Rp -
3 Rp -
SUB TOTAL II -
III. UPAH
1 Pekerja 3.00 OH 85,000 Rp 255,000
2 Tukang - OH 105,000 Rp -
SUB TOTAL III 255,000.00
JUMLAH TOTAL 906,000.00
Diketahui Oleh: Dibuat Oleh
LEMBARAN ACUAN

Lokasi : JR. SUNGAI KEMUNING No RAB: 05


: PEMB. DRAINASE JR. SUNGAI
Kegiatan Jenis Kegiatan: Galian Gorong2
KEMUNING
Nagari : SUNGAI RUMBAI Ukuran : 4.00 m3
Kecamatan : SUNGAI RUMBAI

A. DASAR PERHITUNGAN

Panjang Galian = 4.00 m


Lebar Galian = 1.00 m
Dalam Galian = 1.00 m

Volume Galian = 4.00 m3

B UPAH Indeks Vol Jumlah Sat


pekerja = 0.80 x 4.00 = 3.00 OH

DETAIL RENCANA ANGGARAN BIAYA


Jumlah
TOTAL Satuan Harga Satuan Jumlah Dana
No Uraian Total
( Rp ) ( Rp ) ( Rp )
I. BAHAN
1 Rp -
2 Rp -
3 Rp -
SUB TOTAL I -
II. ALAT
1 Rp -
2 Rp -
3 Rp -
SUB TOTAL II - ###
III. UPAH
1 pekerja 3.00 OH 85,000 Rp 255,000 ###
2 Rp -
SUB TOTAL III 255,000.00 ###
JUMLAH TOTAL 255,000.00 ###
Ketua TPK
LEMBARAN ACUAN

Lokasi : JR. SUNGAI KEMUNING No RAB: 06


: PEMB. DRAINASE JR. SUNGAI
Kegiatan Jenis Kegiatan: Pekerjaan Pasangan Batu Kali
KEMUNING
Nagari : SUNGAI RUMBAI Ukuran : 1.50 m3
Kecamatan : SUNGAI RUMBAI

A. DASAR PERHITUNGAN
Volume Batu Kali = 1.50 m3 (Pengunci Gorong2 + Loneng 2bh)

B BAHAN Indeks Vol Jumlah Sat


Batu Kali = 1.20 x 1.50 = 2.00 M3
Semen Pc ( = 163.00 x 1.50 = 244.00 Kg
Semen Pc ( = 244.00 : 50.00 = 4.00 Zak
Pasir Pasan = 0.520 x 1.50 = 1.00 M3
C UPAH
Pekerja = 1.65 x 1.50 = 2.00 OH
Tukang batu = 0.75 x 1.50 = 1.00 OH

DETAIL RENCANA ANGGARAN BIAYA


Jumlah
TOTAL Satuan Harga Satuan Jumlah Dana
No Uraian Total
( Rp ) ( Rp ) ( Rp )
I. BAHAN
1 Batu Kali 2.00 M3 176,000 Rp 352,000
2 Semen Pc ( 50 Kg) 4.00 Zak 69,000 Rp 276,000
4 Pasir Pasang 1.00 M3 147,000 147,000
3 Rp -
SUB TOTAL I 775,000
II. ALAT
1 Rp -
2 Rp -
3 Rp -
SUB TOTAL II - ###
III. UPAH
1 Pekerja 2.00 OH 85,000 Rp 170,000 ###
2 Tukang batu 1.00 OH 105,000 Rp 105,000
SUB TOTAL III 275,000.00 ###
JUMLAH TOTAL 1,050,000.00 ###

Ketua TPK
LEMBARAN ACUAN

Lokasi : JR. SUNGAI KEMUNING No RAB: 07


: PEMB. DRAINASE JR. SUNGAI
Kegiatan Jenis Kegiatan: Pasangan Gorong-gorong
KEMUNING
Nagari : SUNGAI RUMBAI Ukuran : 2.00 Unit
Kecamatan : SUNGAI RUMBAI

A. DASAR PERHITUNGAN
GG Buis Beton = 4.00 cincin
B. BAHAN Indeks Vol Jumlah Sat
Gorong2 buis Ø 60 = 1.00 x 4.00 = 4.00 bh
Semen = 0.32 x 6.00 = 2.00 Zak

C. UPAH Indeks Vol Jumlah Sat


Pekerja = 0.75 x 4.00 = 3.00 OH
Tukang ba = 0.25 x 4.00 = 2.00 OH

DETAIL RENCANA ANGGARAN BIAYA


Jumlah
TOTAL Satuan Harga Satuan Jumlah Dana
No Uraian Total
( Rp ) ( Rp ) ( Rp )
I. BAHAN
1 Gorong2 buis Ø 60 4.00 bh 189,000 Rp 756,000
4 Semen 2.00 zak 69,000 Rp 138,000
SUB TOTAL I 894,000
II. ALAT
1 Rp -
2 Rp -
3 Rp -
SUB TOTAL II - ###
III. UPAH
1 Pekerja 3.00 OH 85,000 Rp 255,000 ###
2 Tukang batu 2.00 OH 105,000 Rp 210,000
SUB TOTAL III 465,000.00 ###
JUMLAH TOTAL 1,359,000.00 ###

Ketua TPK
DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALAT

Kegiatan : Pekerjaan Drainase Tanjung Harapan


Lokasi : Jorong Tanjung Harapan
Nagari : Simalidu
Kecamatan : Koto Salak

Satuan
No. Uraian Harga Satuan (Rp)

A UPAH
1 Tukang OH 105,000.00
2 Pekerja OH 85,000.00
B BAHAN
1 Kayu Bekisting M3 1,600,000.00
Batu Kali m3 165,000.00
2 Pasir Pasang m3 140,000.00
3 Pasir Beton m3 100.00
4 Pasir Urug m3 75,000.00
5 Semen PCC @50Kg Zak 67,000.00
6 Semen PCC @50Kg Kg 1,340.00
7 Kerikil Beton m3 153,000.00
8 Minyak bekisting Lt 20,000.00
9 paku biasa 2" - 5" Kg 17,000.00
C ALAT
1 Cangkul Bh 70,000.00
2 Sikop Bh 75,000.00
3 Meteran bh 30,000.00
4 Gerobak Dorong Bh 370,000.00
5 Sendok Semen Bh 30,000.00

Tanjung Harapan, Maret 2016


Diketahui Oleh: Dibuat Oleh
Wali Nagari Simalidu Tim Pelaksana Kegiatan
Kec. Koto Salak Jorong Kampung Baru

Drs. Ismail. Y (…………………………….)


Ketua TPK
AR HARGA SATUAN UPAH, BAHAN DAN ALAT

Keterangan

1400kg/m3
Kg

Zak
Kg

Tanjung Harapan, Maret 2016

Tim Pelaksana Kegiatan

(…………………………….)
REKAPITULASI RENCANA ANGGARAN BIAYA
TAHUN ANGGARAN 2015

Propinsi : Sumatera Barat Kampung : Lubuak Aro


: Peningkatan Jalan Rabat Beton Lubuak
Kabupaten : Padang Pariaman Kegiatan
Aro
Kecamatan: Patamuan Volume : 50 m

Biaya Jumlah Jumlah


No Jenis Pekerjaan No. RAB VOL SATUAN Bahan Alat Upah Swadaya Dana Total
Swadaya Dana Swadaya Dana Swadaya Dana (Rp) (Rp) (Rp)
1 Pembersihan Badan Jalan 01 150.00 m2 - Err:509 - Err:509 - Err:509 - Err:509 Err:509
2 Pekerjaan Cor Lantai Drainase 02 2.25 m3 - 1,649,000 - - - 445,000 - 2,094,000 2,094,000
3 Dokumentasi, Laporan & Penggandaan 1.00 Ls - - - - - - - - 140,000
4 Biaya musyawarah Korong 1.00 Ls - - - - - - - - 450,000
5 Perencanaan Kegiatan 1.00 Ls - - - - - - - - 200,000
JUMLAH TOTAL FISIK - Err:509 - Err:509 - Err:509 - Err:509 Err:509
PAJAK PPH + PPN = 13% Err:509
Err:509
TERBILANG LIMA BELAS JUTA RUPIAH

Lubuak Aro Oktober 2015

Diketahui Oleh: Dibuat Oleh


Wali Nagari Tandikat Tim Pelaksana Kegiatan 15000000
Kec. Patamuan Nagari Tandikat harus 0

ZAHIDIN ARSIL, S. Ag
Ketua TPK
REKAPITULASI RENCANA ANGGARAN BIAYA
Kegiatan : : JORONG KAMBANG BARU
Lokasi : : PEMBANGUNAN DRAINASE JR. KAMBANG BARU
Nagari : : SUNGAI RUMBAI TIMUR
Kecamatan : : SUNGAI RUMBAI
Tahun Anggaran 2019

JUMLAH
No. Uraian Volume Satuan BAHAN UPAH ALAT
HARGA
a b c d e f g h
I PLANG NAMA KEGIATAN 1.00 Unit - - - Rp 250,000.00
II DRAINASE SAMPING JALAN KANAN
1 Pekerjaan Galian Saluran 150.00 m3 - 7,735,000.00 - Rp 7,735,000.00
2 Pemasangan Bowplank 125.00 m 1,413,000.00 1,315,000.00 Rp 2,728,000.00
3 Pekerjaan Pasangan Batu Kali 56.25 m3 31,718,000.00 11,655,000.00 607,000.00 Rp 43,980,000.00
4 Pekerjaan Cor Lantai Drainase 2.25 m3 1,649,000.00 445,000.00 - Rp 2,094,000.00
5 Pekerjaan Plester + Acian 149.55 M2 2,985,000.00 9,350,000.00 - Rp 12,335,000.00
6 Box inlet 1.56 m3 913,000.00 465,000.00 - Rp 1,378,000.00
38,678,000.00 ### 607,000.00 70,500,000.00
OP kegiatan = 6% DARI PAGU DANA Rp 4,500,000.00
TOTAL DANA Rp 75,000,000.00
TERBILANG : TUJUH PULUH LIMA JUTA RUPIAH
Kambang Baru, 2019
Diketahui Oleh: Dibuat Oleh
Diketahui Oleh Disetujui Oleh Dilaksanakan Oleh Dibuat Oleh
Camat Sungai Rumbai Wali Nagari Sungai Rumbai Timur Tenaga Teknis Nagari

( MASNAL, SE ) ( ARISMAN BGD SUTAN, S.Sos ) (………………………..) ( DEDET )


Nip: 19640101 198602 1 004
PROGRAM PEMBANGUNAN DAN PEMBERDAYAAN MASYARAKAT ( P3MD )
TAHUN ANGGARAN 2018
JADWAL PELAKSANAAN
Propinsi : Sumatera Barat Jorong : Kambang Baru
Kabupaten : Dharmasraya Kegiatan : Pembangunan Drainase Jr. Kambang Baru
Kecamatan : Sungai Rumbai

MINGGU KE-
URAIAN BOBOT
NO KET
KEGIATAN (%)
I II III IV V VI
Plank nama kegiatan 0.36 0.36 100

1 Pekerjaan Galian Saluran 10.97 5.49 5.49

2 Pemasangan Bowplank 3.87 1.94 1.94

3 Pekerjaan Pasangan Batu Kali 62.38 31.19 31.19

4 Pekerjaan Cor Lantai Drainase 2.97 0.99 0.99 0.99

5 Pekerjaan Plester + Acian 17.50 17.50

6 Box inlet 1.96 1.96


Jumlah 100
Rencana Minggu Ini 0 5.84 7.42 34.12 33.15 18.49 0.99
Rencana Kumulatif Minggu Ini 0 5.84 13.26 47.38 80.53 99.01 100.00
Realisasi Minggu Ini 0
Realisasi Kumulatif Minggu Ini 0
Deviasi

Kambang Baru, 2018

Diketahui Oleh Disetujui Oleh Dilaksanakan Oleh Dibuat Oleh


Camat Sungai Rumbai Wali Nagari Sungai Rumbai Timur TimTeknis Nagari

( MASNAL, SE ) ( ARISMAN BGD SUTAN, S.Sos ) (………………………..) ( DEDET )


Nip: 19640101 198602 1 004
REKAPITULASI MATERIAL DAN UPAH
Lokasi : JORONG KAMBANG BARU
Kegiatan : PEMB. DRAINASE JR. KAMBANG BARU
Nagari : SUNGAI RUMBAI TIMUR
Kecamatan : SUNGAI RUMBAI
Tahun Anggaran : 2019

No. Uraian Jumlah Satuan Harga satuan Jumlah Harga

a b c d e f
Palng nama Kegiatan 1.00 unit 250,000.00 250,000.00
I UPAH
1 Pekerja 263.00 OH 85,000.00 22,355,000.00
2 Tukang 82.00 OH 105,000.00 8,610,000.00

II MATERIAL
1 Paku 3.00 kg 16,000.00 48,000.00
2 Papan Bekisting 0.44 m3 1,680,000.00 735,000.00
3 Tiang Pancang 5/7 0.38 m3 1,680,000.00 630,000.00
4 Batu Kali 69.00 M3 176,000.00 12,144,000.00
5 Koral Beton 2.00 M3 198,000.00 396,000.00
6 Pasir Beton 2.00 M3 178,000.00 356,000.00
7 Pasir Pasang 32.00 M3 147,000.00 4,704,000.00
8 Semen Pc ( 50 Kg) 285.00 Zak 69,000.00 19,665,000.00
III ALAT
1 Benang/Tali 1.00 Ls 22,000.00 22,000.00
2 Keranjang 4.00 bh 20,000.00 80,000.00
3 Gerobak Dorong 1.00 bh 385,000.00 385,000.00
4 Cangkul 2.00 bh 60,000.00 120,000.00
70,500,000.00
OP kegiatan = 6% DARI PAGU DANA 4,500,000.00
TOTAL DANA 75,000,000.00
TERBILANG : TUJUH PULUH LIMA JUTA RUPIAH

Dibuat Oleh
Tenaga Teknis Nagari

( DEDET )
PROGRAM PEMBANGUNAN DAN PEMBERDAYAAN MASYARAKAT ( P3MD )
TAHUN ANGGARAN 2018
JADWAL PELAKSANAAN
Propinsi : Sumatera Barat Jorong: : Sungai Kemuning
Kabupaten : Dharmasraya Kegiatan : Pembangunan Drainase Sungai Klukup
Kecamatan : Koto Salak

JADWAL PELAKSANAAN
URAIAN BOBOT
NO KET
KEGIATAN (%) MINGGU KE-
I II III IV V
1 Pekerjaan Galian Saluran 11.69 11.69 100

2 Pekerjaan Pasangan Batu Kali 66.49 22.16 22.16 22.16

3 Pekerjaan Cor Lantai Drainase 3.17 1.58 1.58 50

4 Pekerjaan Plester + Acian 18.65 9.32 9.32


Jumlah 100
Rencana Minggu Ini 0 11.69 22.16 23.75 33.07 9.32
Rencana Kumulatif Minggu Ini 0 11.69 33.86 57.60 90.68 100.00
Realisasi Minggu Ini 0
Realisasi Kumulatif Minggu Ini 0
Deviasi

Sungai Kemuning, 2017

Diketahui Oleh Disetujui Oleh Dilaksanakan Oleh Dibuat Oleh


Camat Koto Salak Wali Nagari Pulau Mainan Tim Pelaksana Kegiatan TimTeknis Nagari

( SARBAINI, SE ) ( SABIRUDIN ) (………………………..) ( DEDET )


Nip: 19650818 198602 1 007 KETUA TPK
REALISASI RENCANA ANGGARAN BIAYA
KEMAJUAN PELAKSANAAN KEGIATAN

Propinsi : Sumatera Barat Jenis Kegiatan Pembangunan Drainase II Kampung Baru


Kabupaten : Dharmasraya
Kecamatan : Koto Salak Pemeriksaan Ke 1 (satu)
Desa : Koto Salak
Jorong : Kampung Baru

Bobot Hasil Pekerjaan Persentase Persentase


No. Uraian Volume Satuan Jumlah Harga (Rp) (%) Kemajuan Tiap Kemajuan Thd
Mg. Lalu Mg.Ini s/d Mg. Ini Sisa Pekerjaan Seluruh Pekerjaan

a b c d f g h i j k l m

1 PLANG NAMA KEGIATAN 1.00 unit 250,000.00 0.38 - 1.00 1.00 - 100.00 0.38
3 Pekerjaan Galian Saluran 150.00 m3 7,735,000.00 11.65 - 32.00 32.00 118.00 21.33 2.49
4 Pekerjaan Pasangan Batu Kali 56.25 m3 43,980,000.00 66.24 - 10.00 10.00 46.25 17.78 11.78
5 Pekerjaan Cor Lantai Drainase 2.25 m3 2,094,000.00 3.15 - - - 2.25 - -
5 Pekerjaan Plester + Acian 149.55 M2 12,335,000.00 18.58 - 28.00 28.00 121.55 18.72 3.48
JUMLAH 66,394,000.00 100 Bobot 18.12
Operasional 4,500,000.00
TOTAL JUMLAH 70,894,000.00 Prestasi Rencana 100
SWADAYA Deviasi Prestasi

Diverifikasi Oleh: Disetujui Oleh Dibuat Oleh


Tim Verifikasi Kegiatan TPK Kegiatan Tim Teknis Nagari
Koto Salak

(………………………) (………………………) DEDET


REALISASI RENCANA ANGGARAN BIAYA
KEMAJUAN PELAKSANAAN KEGIATAN

Propinsi : Sumatera Barat Jenis Kegiatan Pembangunan Drainase II Kampung Baru


Kabupaten : Dharmasraya
Kecamatan : Koto Salak Pemeriksaan Ke 2 (Dua)
Desa : Koto Salak
Jorong : Kampung Baru

Bobot Hasil Pekerjaan Persentase Persentase


No. Uraian Volume Satuan Jumlah Harga (Rp) (%) Kemajuan Tiap Kemajuan Thd
Mg. Lalu Mg.Ini s/d Mg. Ini Sisa Pekerjaan Seluruh Pekerjaan

a b c d f g h i j k l m

1 PLANG NAMA KEGIATAN 1.00 unit 250,000.00 0.38 1.00 1.00 - 100.00 0.38
3 Pekerjaan Galian Saluran 150.00 m3 7,735,000.00 11.65 32.00 12.28 44.28 105.72 29.52 3.44
4 Pekerjaan Pasangan Batu Kali 56.25 m3 43,980,000.00 66.24 10.00 12.14 22.14 34.11 39.36 26.07
4 Pekerjaan Cor Lantai Drainase 2.25 m3 2,094,000.00 3.15 - 1.64 1.64 0.61 72.89 2.30
5 Pekerjaan Plester + Acian 149.55 M2 12,335,000.00 18.58 28.00 62.20 90.20 59.35 60.31 11.21
JUMLAH 66,394,000.00 100 Bobot 43.39
Operasional 4,500,000.00
TOTAL JUMLAH 70,894,000.00 Prestasi Rencana 100
SWADAYA Deviasi Prestasi

Diverifikasi Oleh: Disetujui Oleh Dibuat Oleh


Tim Verifikasi Kegiatan TPK Kegiatan Tim Teknis Nagari
Koto Salak

(………………………) (………………………) DEDET


Kegiatan : PEMB. DRAINASE JR. KAMBANG BARU
Nagari : SUNGAI RUMBAI TIMUR
1 Paku 3.000 kg 16,000 Rp 48,000
2 Papan Bekisting 0.438 m3 1,680,000 Rp 735,000
3 Tiang Pancang 5/7 0.375 m3 1,680,000 Rp 630,000
4 Batu Kali 69.00 M3 176,000 Rp 12,144,000
5 Koral Beton 2.00 M3 198,000 Rp 396,000
6 Pasir Beton 2.00 M3 178,000 Rp 356,000
7 Pasir Pasang 32.00 M3 147,000 4,704,000
8 Semen Pc ( 50 Kg) 285.00 Zak 69,000 Rp 19,665,000
2 Pekerja 263.00 OH 85,000 Rp 22,355,000
1 Tukang 82.00 OH 105,000 Rp 8,610,000
1 Benang/Tali 1 Ls 22,000 Rp 22,000
2 Keranjang 4 bh 20,000 Rp 80,000
3 Gerobak Dorong 1 bh 385,000 Rp 385,000
4 Cangkul 2 bh 60,000 Rp 120,000
250,000
4,500,000
75,000,000
- 65,043

32
285 -
263 170
82

Anda mungkin juga menyukai