Anda di halaman 1dari 3

PROPOSAL INSIGHT CHALLENGE 2019

IRIS (Integreted River Installation System) Water Control

DIAJUKAN OLEH : TIM CIVITECH

Arum Damaieka 01.2018.1.05748 (Ketua Tim)


Reynard Faial Desmonda 01.2016.1.05102 (Anggota 1)
Azhar Yusuf Ramadhan 01.2016.1.05341 (Anggota 2)

INSTITUT TEKNOLOGI ADHI TAMA SURABAYA


KOTA SURABAYA
2019
LEMBAR PENGESAHAN

1. Judul Proposal : IRIS (Integreted River Instalation System) Water


Control
2. Biodata Ketua Tim
Nama : Arum Damaika
NIM : 01.2018.1.05748
Semester :3
Universitas : Institute Teknologi Adhi Tama Surabaya
Alamat Rumah : Perumahan Kebon Candi Blok M-1 ,kec.godang
wetan, kab. pasuruan
No. Telepon/HP : 0812-2795-2793
Email : ayomikhtiar@gmail.com
3. Biodata Anggota
Nama Anggota 1 : Reynard Faizal Desmonda
NIS Anggota 1 : 01.2016.1.05102
Nama Anggota 2 : Azhar Yusuf Ramadhan
NIS Anggota 2 : 01.2016.1.05341
4. Biodata Pembimbing
Nama dengan Gelar : Mila Kusuma Wardani, S.T , M.T.
NIP : 153087
No. Telepon / HP : 0812-3056-226
Surabaya, 14 Agusutus 2019
Menyetujui
Ketua Tim

Arum Damaieka
NPM 01.2018.1.05748
DAFTAR ISI

HALAMAN PENGESAHAN ...................................................................... i


DAFTAR ISI ................................................................................................ ii
ABSTRAK ................................................................................................... iii
LEMBAR PENGESAHAN ......................................................................... iv
BAB I PENDAHULUAN
1.1 Latar Belakang ..................................................................................... 1
1.2 Rumusan Masalah ................................................................................ 2
1.3 Tujuan .................................................................................................. 2
1.4 Manfaat ................................................................................................ 2

BAB II KAJIAN TEORI


2.1 Data Kebutuhan Air Bersih di Indonesi................................................ 3
2.2 Kualitas Air sungai di Indonesia……………....................................... 4
2.3 Sistem Pemantauan Kualitas Air.......................................................... 5

BAB III DEKRIPSI KARYA


3.1 Integrated River Installation System (IRIS) Water Control sebagai 6
Kontrol ……………………………………………………………
3.2 Layout IRIS (Integrated River Installation System) Water Control 8

BAB IV RENCANA ANGGARAN BIAYA


4.1 Anggaran Biaya Pembuatan Prototype IRIS ..................................... 10

BAB V KESIMPULAN
5.1 Kesimpulan …………………………………………………………. 11
DAFTAR PUSTAKA .................................................................................. 12
LAMPIRAN ................................................................................................. 13

Anda mungkin juga menyukai