Proyecto: TORRE MERCEDES CAMPOS SINERGIA - Contraincendios Desagues Agua Fria Agua caliente
Proyecto: TORRE MERCEDES CAMPOS SINERGIA - Obra gruesa Obra Fina Trabajos acabados Jardin exterior
REVIT
Cantidad
1.00 Marcos
3.00 Marcos
1.00 Marcos
101.20 Marcos
12.17 Marcos
126.00 Marcos
126.00 Marcos
2.00 Marcos
4.00 Marcos
13.00 Marcos
3.00 Marcos
1.00 Marcos
126.00 Marcos
1,706.68 Marcos
258.69 Marcos
356.58 Marcos
72.00 Marcos
96.00 Marcos
30.00 Marcos
288.00 Marcos
108.00 Marcos
Marcos
1.00 Marcos
3.01 Marcos
1.00 Marcos
51.90 Marcos
9.86 Marcos
17.56 Marcos
4.00 Marcos
2.00 Marcos
4.00 Marcos
12.00 Elias
226.00 Elias
11.00 Elias
67.30 Elias
1.00 Elias
4.77 Marcos
59.31 Marcos
8.44 Marcos
164.20 Marcos
1.00 Marcos
1.00 Marcos
1.00 Marcos
23.00 Marcos
2.00 Marcos
7.00 Marcos
81.00 Marcos
20.00 Marcos
2.00 Marcos
6.00 Marcos
2.00 Marcos
16.00 Marcos
2.00 Marcos
26.00 Marcos
1.00 Marcos
3.00 Marcos
20.00 Marcos
23.00 Roger
1.00 Marcos
1.00
65.32 Gary
92.45 Gary
1,496.45 Gary
221.56 Gary
149.65 Gary
1,301.21 Gary
80.00 Gary
198.00 Gary
910.00 Gary
2.00 Gary
44.00 Gary
231.00 Gary
97.00 Gary
9.00 Gary
2.00 Gary
27.00 Gary
460.00 Gary
6.00 Gary
233.00 Gary
130.00 Gary
65.00 Gary
2.00 Gary
2.00 Gary
199.00 Gary
144.00 Gary
55.00 Gary
119.00 Gary
130.00 Gary
42.00 Gary
1.00 Gary
7.00 Gary
275.00 Gary
58.00 Gary
311.00 Gary
3.00 Gary
53.00 Gary
3.00 Gary
2.00 Gary
3.00 Gary
2.00 Gary
74.80 Gary
218.90 Gary
21.00 Gary
29.60 Gary
286.89 Gary
108.32 Marcos
267.32 Marcos
101.56 Marcos
694.30 Marcos
1,086.83 Marcos
2,498.35 Marcos
16.00 Marcos
12.00 Marcos
3.00 Marcos
5.00 Marcos
138.00 Marcos
404.00 Marcos
4.00 Marcos
7.00 Marcos
1.00 Marcos
14.00 Marcos
3.00 Marcos
42.00 Marcos
49.00 Marcos
159.00 Marcos
278.00 Marcos
6.00 Marcos
1,302.00 Marcos
3.00 Marcos
19.00 Marcos
18.00 Marcos
107.00 Marcos
135.00 Marcos
137.00 Marcos
498.00 Marcos
14.00 Marcos
8.00 Marcos
2.00 Marcos
4.00 Marcos
98.00 Marcos
170.00 Marcos
380.00 Marcos
6.00 Marcos
6.00 Marcos
1.00 Marcos
75.00 Marcos
28.00 Marcos
195.00 Marcos
76.00 Marcos
186.00 Marcos
64.00 Marcos
623.00 Marcos
72.00 Marcos
52.00 Marcos
2.00 Roger
4.00 Roger
1.00 Roger
126.00 Elias
4.00 Elias
3.00 Elias
6.00 Elias
2.00 Elias
2.00
811.72 Marcos
1,404.58 Marcos
184.00 Marcos
228.00 Marcos
606.00 Marcos
69.00 Marcos
145.00 Marcos
120.00 Marcos
207.00 Marcos
72.00 Marcos
72.00 Marcos
310.00 Marcos
811.72 Performance Elias
1,404.58 Performance Elias
Cantidad
686.00 Gary
3,947.24 Gary
5,566.04 Gary
5,682.50 Gary
91.47 Gary
234.60 Gary
1,569.43 Gary
126.92 Gary
316.87 Gary
1,336.68 Gary
4,530.24 Gary
2,601.66 Gary
3,270.00 Gary
1,953.07 Gary
Cantidad
GAS FURNACES DE 60,000BTU/HR Eq 17.00
GAS FURNACES DE 80,000BTU/HR Eq 21.00
GAS FURNACES DE 100,000BTU/HR Eq 17.00
TERMOSTATO DIGITAL ELECTRONICO PROGRAMABLE (5 - 30°C) eq 55.00
HUMIFICADOR DE BAY PASS Capacidad: 15 GPD,Para las Unidades
terminales (Gas Furnaces) eq 55.00
HUMIDISTATO CONTROL
• Visualización de la temperatura.
• Rango de humedad: 10 a 60%.
• Diferencial de humedad: 4 – 6%.
• Funciona con 24 voltios. eq 55.00