Anda di halaman 1dari 6

Hamad Abdulaziz Al Kawary

CEILING CLOSURE INSPECTION CHECKLIST


Project Name : 5B+G+38 Floor, AL SHAHAD TOWER, AL DAFNA IR No.:
Client: Hamad Abdulaziz Al Kawari Location:
Contractor: Al Bandary Engineering Trad. & Contr.Co. W.L.L Date:
Consultant: MZ and Partners W.L.L.

Checked Checked/
by Verified
Installation
Disciplines Activities Contract NOTES by the STATUS REMARKS
Status or's site Consulta
Engr. nt Engr.

Head of
1. Fire Stop
walls YES NO N/A YES NO YES NO A B C D

1. Framings
YES NO N/A YES NO YES NO A B C D

Suspended
2. Grid
ARCHITECTURAL

Ceiling YES NO N/A YES NO YES NO A B C D

3. Hangers
YES NO N/A YES NO YES NO A B C D

1. Paint Above Ceiling Line


YES NO N/A YES NO YES NO A B C D

2. Tiles Above Ceiling Line


YES NO N/A YES NO YES NO A B C D

3. Plaster Above Ceiling


Finishes Line YES NO N/A YES NO YES NO A B C D

4. Wood Paneling Above


Ceiling Line YES NO N/A YES NO YES NO A B C D

5. Wall Paper Above Ceiling


Line YES NO N/A YES NO YES NO A B C D

NCR
YES NO N/A YES NO YES NO A B C D

SOR
YES NO N/A YES NO YES NO A B C D

1. Wiring
YES NO N/A YES NO YES NO A B C D

2. Connection
Conduits & YES NO N/A YES NO YES NO A B C D
Box
3. Lighting & Fixture
YES NO N/A YES NO YES NO A B C D

4. Testing
YES NO N/A YES NO YES NO A B C D

1. Wiring
YES NO N/A YES NO YES NO A B C D

2. Connection
Conduits & YES NO N/A YES NO YES NO A B C D
Box
3. Devices
YES NO N/A YES NO YES NO A B C D

4. Testing
YES NO N/A YES NO YES NO A B C D

1. Detection
YES NO N/A YES NO YES NO A B C D

2. Alarm System
YES NO N/A YES NO YES NO A B C D

Conduit &
3. Wiring
Box YES NO N/A YES NO YES NO A B C D

4. Connections Services
YES NO N/A YES NO YES NO A B C D

5. Testing
YES NO N/A YES NO YES NO A B C D

1. Tel & Data


YES NO N/A YES NO YES NO A B C D

2. GRMS
YES NO N/A YES NO YES NO A B C D
ELECTRICAL

3. PA
YES NO N/A YES NO YES NO A B C D

4. CCTV
Conduits & YES NO N/A YES NO YES NO A B C D
Box
5. Access Control
YES NO N/A YES NO YES NO A B C D

6. Wiring
YES NO N/A YES NO YES NO A B C D

7. Connection Devices
YES NO N/A YES NO YES NO A B C D

8. Testing
YES NO N/A YES NO YES NO A B C D

1. Pulling
YES NO N/A YES NO YES NO A B C D

2. Cable Arrangment
YES NO N/A YES NO YES NO A B C D

Feeder
3. Support
Cable YES NO N/A YES NO YES NO A B C D

4. Termination
YES NO N/A YES NO YES NO A B C D

5.Testing
YES NO N/A YES NO YES NO A B C D

1. SMDB
YES NO N/A YES NO YES NO A B C D

2. SSMDB
YES NO N/A YES NO YES NO A B C D

Panels

Form Ref. No.: PRJ/F7/V3 Date of Issue: March 2014 Version: V3 Page 1 of 6
ELECTRICA
Hamad Abdulaziz Al Kawary
CEILING CLOSURE INSPECTION CHECKLIST
Project Name : 5B+G+38 Floor, AL SHAHAD TOWER, AL DAFNA IR No.:
Client: Hamad Abdulaziz Al Kawari Location:
Contractor: Al Bandary Engineering Trad. & Contr.Co. W.L.L Date:
Consultant: MZ and Partners W.L.L.

Checked Checked/
by Verified
Installation
Disciplines Activities Contract NOTES by the STATUS REMARKS
Status or's site Consulta
Engr. nt Engr.

Panels 3. DB
YES NO N/A YES NO YES NO A B C D

4. CPE
YES NO N/A YES NO YES NO A B C D

5. GRMS
YES NO N/A YES NO YES NO A B C D

Cable Tray
YES NO N/A YES NO YES NO A B C D

Cable Trunking
YES NO N/A YES NO YES NO A B C D

NCR
YES NO N/A YES NO YES NO A B C D

Form Ref. No.: PRJ/F7/V3 Date of Issue: March 2014 Version: V3 Page 2 of 6
Hamad Abdulaziz Al Kawary
CEILING CLOSURE INSPECTION CHECKLIST
Project Name : 5B+G+38 Floor, AL SHAHAD TOWER, AL DAFNA IR No.:
Client: Hamad Abdulaziz Al Kawari Location:
Contractor: Al Bandary Engineering Trad. & Contr.Co. W.L.L Date:
Consultant: MZ and Partners W.L.L.

Checked Checked/
by Verified
Installation
Disciplines Activities Contract NOTES by the STATUS REMARKS
Status or's site Consulta
Engr. nt Engr.

1. Ducts
YES NO N/A YES NO YES NO A B C D

2. FCU
YES NO N/A YES NO YES NO A B C D

3. VCD
YES NO N/A YES NO YES NO A B C D

HVAC 4. FD
YES NO N/A YES NO YES NO A B C D

5. Fire Stop
YES NO N/A YES NO YES NO A B C D

6. Chilled Water Pipe


YES NO N/A YES NO YES NO A B C D

7. Plenum
YES NO N/A YES NO YES NO A B C D

1. Pipe
YES NO N/A YES NO YES NO A B C D

2. FD
MECHANICAL

YES NO N/A YES NO YES NO A B C D


Drainage
3. Insulation
YES NO N/A YES NO YES NO A B C D

4. Fire Stop
YES NO N/A YES NO YES NO A B C D

1. Pipes
YES NO N/A YES NO YES NO A B C D

2. Insulation
YES NO N/A YES NO YES NO A B C D

Water 3. Supports
YES NO N/A YES NO YES NO A B C D

4. Valves
YES NO N/A YES NO YES NO A B C D

5. Firestop
YES NO N/A YES NO YES NO A B C D

1. Upright Sprinkler
YES NO N/A YES NO YES NO A B C D

2. Pendant Sprinkler
YES NO N/A YES NO YES NO A B C D
Fire Fighting
3. Supports
YES NO N/A YES NO YES NO A B C D

4. Firestop
YES NO N/A YES NO YES NO A B C D

NCR
YES NO N/A YES NO YES NO A B C D

SOR
YES NO N/A YES NO YES NO A B C D
STRUCTURAL

NCR
YES NO N/A YES NO YES NO A B C D

SOR
YES NO N/A YES NO YES NO A B C D

Note: The above inspection details (I.e. contractor's checked & signed) shall be confirmed by the contractor's Project Manager as signature required hereunder

Contractor Project Manager: Signature: Date:


Checking and Confirmation
Discipline: Architectural Structural Mechanical Electrical
Inspector:
Date/Time:

Consultant's Representative: Date:

Received by: Date:

NOTE: A - Approved B- Approved as Noted C- Revise & Re-submit D- Rejected

Form Ref. No.: PRJ/F7/V3 Date of Issue: March 2014 Version: V3 Page 3 of 6
RE INSPECTION CHECKLIST
IR No.:
Location:
Date:

REMARKS

Form Ref. No.: PRJ/F7/V3 Date of Issue: March 2014 Version: V3 Page 4 of 6
RE INSPECTION CHECKLIST
IR No.:
Location:
Date:

REMARKS

Form Ref. No.: PRJ/F7/V3 Date of Issue: March 2014 Version: V3 Page 5 of 6
RE INSPECTION CHECKLIST
IR No.:
Location:
Date:

REMARKS

ned) shall be confirmed by the contractor's Project Manager as signature required hereunder

ure: Date:
ecking and Confirmation
Electrical

Date:

Date:

Form Ref. No.: PRJ/F7/V3 Date of Issue: March 2014 Version: V3 Page 6 of 6