d Pekerjaan 1m3 kolom beton bertulang (150 kg besi + bekisting) 8,186,042 1,069,376 11,106,502
1.2 m3
e Memasang 1 m2 Plesteran 1 PC : 3 PP. Tebal 15mm 152 m2 17,863 77,292 14,463,484
f Pemasangan dinding 1/2 bata 76 m2 137,335 230,688 27,969,748
g Pekerjaan Pengecatan 152 m2 33,554 14,222 7,262,001
Jumlah 150,886,606.00
PPN 10 % 15,088,661
Total 165,975,267
Terbilang : Err:511
NILAI TOTAL
No. Uraian VOL STN HARGA
Material Jasa
(Rp)
1 2 3 4 5 6 7 = (5X3)+(6X3)
b Material Pengeboran
1 Pipa 4" 35 m 115,000 4,025,000
2 Pipa 2" 35 m 38,000 1,330,000
3 Pipa 3/4" 24 m 10,500 252,000
4 Accessories Pipa 1 ls 1,400,000 1,400,000
5 Ijuk 15 kg 51,750 776,250
Jumlah 7,783,250
CANDRA SOLINAR
x PT PLN (PERSERO)
PENYALURAN DAN PUSAT PENGATUR BEBAN SUMATERA
UNIT PELAYANAN TRANSMISI JAMBI
NILAI TOTAL
No. Uraian VOL STN HARGA
Material Jasa
(Rp)
1 2 3 4 5 6 7 = (5X3)+(6X3)
a Pekerjaan Persiapan
1 Pengukuran&pembersihan lapangan kerja 1 ls 1,000,000 1,000,000
b Pekerjaan Pondasi
1 Pekerjaan Galian Tanah 3.97 m3 18,200 72,254
2 Pekerjaan Urugan Kembali Bekas Galian 1.39 m3 4,180 5,810
3 Urugan tanah bawah lantai 1.454 m3 4,180 6,078
4 Urugan pasir bawah pondasi & lantai 0.364 m3 108,550 39,512
5 Pondasi Batu kali 1 pc : 4 ps 2.76 m3 455,600 1,257,456
Jumlah 1,381,110
CANDARA SOLINAR
x PT PLN (PERSERO)
PENYALURAN DAN PUSAT PENGATUR BEBAN SUMATERA
UNIT PELAYANAN TRANSMISI JAMBI
NILAI TOTAL
Jumlah 91,260
b Pekerjaan Pondasi 1m3 1PC : 4 PS
1 Batu belah 1.2 m3 328,000 393,600
CANDRA SOLINAR
x PT PLN (PERSERO)
PENYALURAN DAN PUSAT PENGATUR BEBAN SUMATERA
UNIT PELAYANAN TRANSMISI JAMBI
NILAI TOTAL
No. Uraian VOL STN HARGA
Material Jasa
(Rp)
1 2 3 4 5 6 7 = (5X3)+(6X3)
II Material Pengeboran
1 Pipa 4" 50 m -
2 Pipa 2" 50 m -
3 Pipa 3/4" 24 m -
4 Accessories Pipa 1 ls -
5 Ijuk 15 kg -
1 SAND FILTER 1 bh -
2 carbon filter 1 bh -
3 vero filter 1 bh -
4 Pompa 1 ls -
5 Tedmon 1 bh -
6 Bak Air 1 bh -
7 Rumah Pompa 1 bh -
Jumlah -
PPN 10 % -
Total -
Terbilang