PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN BETON
1 1.00 m3 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
SNI-2007 247.0000 kg Portland Cement @ Rp. 2,500.00
0.6207 m3 Pasir beton @ Rp. 1,000,000.00
0.7400 m3 Koral beton @ Rp. 1,000,000.00
215.0000 Liter Air @ Rp. 100.95 21,703.18
1.6500 oh Pekerja @ Rp. 198,550.00 327,607.50
0.2750 oh Tukang batu @ Rp. 300,000.00 82,500.00
0.0280 oh Kepala tukang @ Rp. 450,000.00 12,600.00
0.0830 oh Mandor @ Rp. 500,000.00 41,500.00
JUMLAH ( BELUM PPN ) 485,910.68
JASA 10 %
JUMLAH
DIBULATKAN
2 1.00 m3 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
SNI-2007 276.0000 kg Portland Cement @ Rp. 2,500.00
0.5914 m3 Pasir beton @ Rp. 1,000,000.00
0.7496 m3 Koral beton @ Rp. 1,000,000.00
215.0000 Liter Air @ Rp. 100.95 21,703.18
1.6500 oh Pekerja @ Rp. 198,550.00 327,607.50
0.2750 oh Tukang batu @ Rp. 300,000.00 82,500.00
0.0280 oh Kepala tukang @ Rp. 450,000.00 12,600.00
0.0830 oh Mandor @ Rp. 500,000.00 41,500.00
JUMLAH ( BELUM PPN ) 485,910.68
JASA 10 %
JUMLAH
DIBULATKAN
3 1.00 m3 Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
SNI-2007 299.0000 kg Portland Cement @ Rp. 2,500.00
0.5707 m3 Pasir beton @ Rp. 1,000,000.00
0.7533 m3 Koral beton @ Rp. 1,000,000.00
215.0000 Liter Air @ Rp. 100.95 21,703.18
1.6500 oh Pekerja @ Rp. 198,550.00 327,607.50
0.2750 oh Tukang batu @ Rp. 300,000.00 82,500.00
0.0280 oh Kepala tukang @ Rp. 450,000.00 12,600.00
0.0830 oh Mandor @ Rp. 500,000.00 41,500.00
JUMLAH ( BELUM PPN ) 485,910.68
JASA 10 %
JUMLAH
DIBULATKAN
4 1.00 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0
SNI-2007 230.0000 kg Portland Cement @ Rp. 2,500.00
0.6379 m3 Pasir beton @ Rp. 1,000,000.00
0.7607 m3 Koral beton @ Rp. 1,000,000.00
200.0000 Liter Air @ Rp. 100.95 20,189.00
1.2000 oh Pekerja @ Rp. 198,550.00 238,260.00
0.2000 oh Tukang batu @ Rp. 300,000.00 60,000.00
0.0200 oh Kepala tukang @ Rp. 450,000.00 9,000.00
0.0600 oh Mandor @ Rp. 500,000.00 30,000.00
JUMLAH ( BELUM PPN ) 357,449.00
JASA 10 %
JUMLAH
DIBULATKAN
5 1.00 m3 Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
SNI-2007 326.0000 kg Portland Cement @ Rp. 2,500.00
0.5429 m3 Pasir beton @ Rp. 1,000,000.00
0.7622 m3 Koral beton @ Rp. 1,000,000.00
215.0000 Liter Air @ Rp. 100.95 21,703.18
1.6500 oh Pekerja @ Rp. 198,550.00 327,607.50
0.2750 oh Tukang batu @ Rp. 300,000.00 82,500.00
0.0280 oh Kepala tukang @ Rp. 450,000.00 12,600.00
0.0830 oh Mandor @ Rp. 500,000.00 41,500.00
JUMLAH ( BELUM PPN ) 485,910.68
JASA 10 %
JUMLAH
DIBULATKAN
6 1.00 m3 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
SNI-2007 352.0000 kg Portland Cement @ Rp. 2,500.00
0.5221 m3 Pasir beton @ Rp. 1,000,000.00
0.7637 m3 Koral beton @ Rp. 1,000,000.00
215.0000 Liter Air @ Rp. 100.95 21,703.18
1.6500 oh Pekerja @ Rp. 198,550.00 327,607.50
0.2750 oh Tukang batu @ Rp. 300,000.00 82,500.00
0.0280 oh Kepala tukang @ Rp. 450,000.00 12,600.00
0.0830 oh Mandor @ Rp. 500,000.00 41,500.00
JUMLAH ( BELUM PPN ) 485,910.68
JASA 10 %
JUMLAH
DIBULATKAN
7 1.00 m3 Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
SNI-2007 371.0000 kg Portland Cement @ Rp. 2,500.00
0.4986 m3 Pasir beton @ Rp. 1,000,000.00
0.7756 m3 Koral beton @ Rp. 1,000,000.00
215.0000 Liter Air @ Rp. 100.95 21,703.18
1.6500 oh Pekerja @ Rp. 198,550.00 327,607.50
0.2750 oh Tukang batu @ Rp. 300,000.00 82,500.00
0.0280 oh Kepala tukang @ Rp. 450,000.00 12,600.00
0.0830 oh Mandor @ Rp. 500,000.00 41,500.00
JUMLAH ( BELUM PPN ) 485,910.68
JASA 10 %
JUMLAH
DIBULATKAN
8 1.00 m3 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
SNI-2007 384.0000 kg Portland Cement @ Rp. 2,500.00
0.4943 m3 Pasir beton @ Rp. 1,000,000.00
0.7696 m3 Koral beton @ Rp. 1,000,000.00
215.0000 Liter Air @ Rp. 100.95 21,703.18
1.6500 oh Pekerja @ Rp. 198,550.00 327,607.50
0.2750 oh Tukang batu @ Rp. 300,000.00 82,500.00
0.0280 oh Kepala tukang @ Rp. 450,000.00 12,600.00
0.0830 oh Mandor @ Rp. 500,000.00 41,500.00
JUMLAH ( BELUM PPN ) 485,910.68
JASA 10 %
JUMLAH
DIBULATKAN
9 1.00 m3 Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
SNI-2007 406.0000 kg Portland Cement @ Rp. 2,500.00
0.4886 m3 Pasir beton @ Rp. 1,000,000.00
0.7600 m3 Koral beton @ Rp. 1,000,000.00
215.0000 Liter Air @ Rp. 100.95 21,703.18
1.6500 oh Pekerja @ Rp. 198,550.00 327,607.50
0.2750 oh Tukang batu @ Rp. 300,000.00 82,500.00
0.0280 oh Kepala tukang @ Rp. 450,000.00 12,600.00
0.0830 oh Mandor @ Rp. 500,000.00 41,500.00
JUMLAH ( BELUM PPN ) 485,910.68
JASA 10 %
JUMLAH
DIBULATKAN
10 1.00 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
SNI-2007 413.0000 kg Portland Cement @ Rp. 2,500.00
0.4864 m3 Pasir beton @ Rp. 1,000,000.00
0.7563 m3 Koral beton @ Rp. 1,000,000.00
215.0000 Liter Air @ Rp. 100.95 21,703.18
1.6500 oh Pekerja @ Rp. 198,550.00 327,607.50
0.2750 oh Tukang batu @ Rp. 300,000.00 82,500.00
0.0280 oh Kepala tukang @ Rp. 450,000.00 12,600.00
0.0830 oh Mandor @ Rp. 500,000.00 41,500.00
JUMLAH ( BELUM PPN ) 485,910.68
JASA 10 %
JUMLAH
DIBULATKAN
4 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu
SNI-2007 1.2000 m3 Balok kayu @ Rp. 1,050,000.00
1.2500 kg Paku 10 cm @ Rp. 20,000.00
1.0000 kg Lem kayu @ Rp. 13,750.00
6.0000 oh Pekerja @ Rp. 198,550.00 1,191,300.00
18.0000 oh Tukang kayu @ Rp. 300,000.00 5,400,000.00
1.8000 oh Kepala tukang @ Rp. 450,000.00 810,000.00
0.3000 oh Mandor @ Rp. 500,000.00 150,000.00
JUMLAH ( BELUM PPN ) 7,551,300.00
JASA 10 %
JUMLAH
DIBULATKAN
6 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat P
SNI-2002 0.2000 kg Cat meni @ Rp. 18,500.00
0.1500 kg Plamir @ Rp. 18,250.00
0.1700 kg Cat dasar @ Rp. 40,000.00
0.3500 kg Cat penutup @ Rp. 40,000.00
0.0700 oh Pekerja @ Rp. 198,550.00 13,898.50
0.1050 oh Tukang Cat @ Rp. 300,000.00 31,500.00
0.0040 oh Kepala tukang @ Rp. 450,000.00 1,800.00
0.0025 oh Mandor @ Rp. 500,000.00 1,250.00
JUMLAH ( BELUM TERMASUK PPN ) 48,448.50
JASA 10 %
JUMLAH
DIBULATKAN
11 1.00 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
SNI-2002 0.1000 Kg Plamir tembok @ Rp. 14,000.00
0.1000 Kg Cat dasar @ Rp. 13,000.00
0.2600 Kg Cat penutup 2 x @ Rp. 13,000.00
0.0200 oh Pekerja @ Rp. 198,550.00 3,971.00
0.0630 oh Tukang Cat @ Rp. 300,000.00 18,900.00
0.0063 oh Kepala tukang @ Rp. 450,000.00 2,835.00
0.0025 oh Mandor @ Rp. 500,000.00 1,250.00
JUMLAH ( BELUM TERMASUK PPN ) 26,956.00
JASA 10 %
JUMLAH
DIBULATKAN
Bahan Jumlah
(4) (5)
36,960.00
21,560.00
400.00
58,920.00 115,775.00
115,775.00
115,775.00
- 161,412.50
-
161,412.50
161,412.00
1,200,000.00
1,200,000.00 1,264,565.00
-
1,264,565.00
1,264,565.00
1,200,000.00
432,000.00
1,632,000.00 1,940,919.00
-
1,940,919.00
1,940,919.00
47,621.60
-
47,621.60
47,621.00
1,200,000.00
1,200,000.00 1,262,137.50
-
1,262,137.50
1,262,137.00
1,200,000.00
102,500.00
78,600.00
523,000.00
1,904,100.00 2,498,175.00
-
2,498,175.00
2,498,175.00
1,978,200.00 2,464,110.68
-
2,464,110.68
2,464,110.00
2,031,000.00 2,516,910.68
-
2,516,910.68
2,516,910.00
2) cm, w/c = 0,72
747,500.00
570,700.00
753,300.00
2,071,500.00 2,557,410.68
-
2,557,410.68
2,557,410.00
1,973,600.00 2,331,049.00
-
2,331,049.00
2,331,049.00
2,120,100.00 2,606,010.68
-
2,606,010.68
2,606,010.00
2,165,800.00 2,651,710.68
-
2,651,710.68
2,651,710.00
2) cm, w/c = 0,58
927,500.00
498,600.00
775,600.00
2,201,700.00 2,687,610.68
-
2,687,610.68
2,687,610.00
2,223,900.00 2,709,810.68
-
2,709,810.68
2,709,810.00
2,263,600.00 2,749,510.68
-
2,749,510.68
2,749,510.00
2,275,200.00 2,761,110.68
-
2,761,110.68
2,761,110.00
210,000.00
2,250.00
212,250.00 252,298.50
-
252,298.50
252,298.00
210,000.00
2,250.00
212,250.00 252,298.50
-
252,298.50
252,298.00
17,850.00
25,200.00
8,000.00
51,050.00 268,260.00
-
268,260.00
268,260.00
17,850.00
52,050.00
8,000.00
77,900.00 295,110.00
-
295,110.00
295,110.00
- 794,200.00
-
794,200.00
794,200.00
2,606,010.00
2,522,980.00
2,682,600.00
794,200.00
8,605,790.00 8,605,790.00
8,605,790.00
43,750.00
31,250.00
40,000.00
115,000.00 261,275.00
-
261,275.00
261,275.00
15,600.00
24,000.00
39,600.00 158,415.00
-
158,415.00
158,415.00
8,125.00
8,125.00 87,335.00
-
87,335.00
87,335.00
870,000.00
520,000.00
545,000.00
1,935,000.00 2,388,857.50
-
2,388,857.50
2,388,857.00
kirai bentang 6 meter
5,500,000.00
180,000.00
112,000.00
5,792,000.00 10,826,200.00
-
10,826,200.00
10,826,200.00
5,500,000.00
180,000.00
60,000.00
5,740,000.00 8,760,520.00
-
8,760,520.00
8,760,520.00
12,600.00
2,000.00
14,600.00 168,132.50
-
168,132.50
168,132.00
37,080.00
60.00
37,140.00 87,288.50
-
87,288.50
87,288.00
31,500.00
200.00
31,700.00 60,377.50
-
60,377.50
60,377.00
96,900.00
4,000.00
100,900.00 148,426.00
-
148,426.00
148,426.00
49,500.00
1,000.00
50,500.00 167,282.50
-
167,282.50
167,282.00
9,030.00
1,200.00
10,230.00 85,535.00
-
85,535.00
85,535.00
1,260,000.00
25,000.00
13,750.00
1,298,750.00 8,850,050.00
-
8,850,050.00
8,850,050.00
42,000.00
6,875.00
48,875.00 1,307,425.00
1,307,425.00
1,307,425.00
25,200.00
4,125.00
29,325.00 1,036,165.00
1,036,165.00
1,036,165.00
63,000.00
3,000.00
66,000.00 1,056,528.50
-
1,056,528.50
1,056,528.00
110,000.00
63,000.00
3,000.00
176,000.00 231,103.25
-
231,103.25
231,103.00
27,237.50 75,686.00
-
75,686.00
75,686.00
5,062.50
12,555.00
6,000.00
23,617.50 50,067.50
-
50,067.50
50,067.00
6,080.00 33,036.00
-
33,036.00
33,036.00
175,000.00
175,000.00 333,985.50
-
333,985.50
333,985.00
36,000.00
36,000.00 91,103.25
-
91,103.25
91,103.00
43,000.00
43,000.00 79,735.50
-
79,735.50
79,735.00
50,000.00
50,000.00 123,471.00
-
123,471.00
123,471.00
168,000.00
58,800.00
226,800.00 334,954.25
-
334,954.25
334,954.00
434,000.00
5,000.00
-
5,000.00
9,000.00
453,000.00 579,856.25
-
579,856.25
579,856.00
Harga Satuan Upah
No Uraian Harga
1 Kayu Kaso 5 / 7 m3 3,080,000
2 Kayu Papan 3 / 20 m3 3,080,000
3 Paku Biasa 2" - 5" kg 20,000
4 Pasir urug m3 1,000,000
5 Batu belah 15 cm/20 cm m3 1,000,000
6 sirtu m3 1,000,000
7 PC kg 2,500 1800
8 Kapur pasang m3 600,000
9 Pasir pasang m3 1,000,000
10 Koral beton m3 1,000,000
11 Air ltr 101
12 Besi beton ulir kg 20,000.00
13 Kawat beton kg 15,000.00
14 Papan cetakan m3 1,050,000.00
15 Multiplek lbr 150,000.00
16 Batako bh 3,500.00
17 Kayu besi balok m3 5,000,000
18 Besi strip kg 12,000.00
19 Triplek 4 mm lbr 103,000.00
20 List Kayu Profil m 30,000.00
21 Seng Gelombang lbr 95,000.00
22 Nok Seng lbr 45,000
23 Lem kayu kg 13,750.00
24 Kaca polos m2 100,000.00
25 Cat meni kg 18,500.00
26 Plamir kg 18,250.00
27 Cat dasar kayu kg 40,000.00
28 Cat penutup kayu kg 40,000.00
29 Politur lt 33,750.00
30 Politur jadi lt 33,750.00
31 Amplas lbr 3,000.00
32 Plamir tembok lt 14,000.00
33 Cat dasar tembok lt 13,000.00
34 Cat penutup tembok lt 13,000.00
35 Kunci tanam biasa bh 175,000.00
36 Engsel pintu bh 36,000.00
37 Engsel jendela bh 43,000.00
38 Kunci selot bh 50,000.00
39 Pipa Galvanize 3" m 140,000.00
40 BRC Lengkap tiang m 1,000,000.00
41 Pintu Pagar BRC bh 1,000,000.00
42 Canal C2.150.2.5 btg 560,000.00
43 Tray Jalur Kabel DC m 200,000.00