REKAPITULASI

RENCANA ANGGARAN BIAYA

PROGRAM : PEMBINAAN DAN PENGEMBANGAN BIDANG KETENAGALISTRIKAN


KEGIATAN : PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH)
PEKERJAAN : PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) DI PEDES
LOKASI : DUSUN SANGKE DESA MERAGUN KECAMATAN NANGA TAMAN KABUPATEN SEKA
SUMBER BIAYA : DAK/DAU
TAHUN ANGGARAN : 2012

NO URAIAN JENIS PEKERJAAN

1 2
A PEKERJAAN KONSTRUKSI SIPIL

I PEKERJAAN PERSIAPAN

II PEKERJAAN BENDUNG/INTEK

III PEKERJAAN BAK PENENANG

IV PEKERJAAN PIPA PESAT

V RUMAH PEMBANGKIT&DUDUKAN TURBIN

VI TANGGA INSPEKS

JUMLAH ( A )

B PEKERJAAN MEKANIKAL ELEKTRIKAL

I PERALATAN MEKANIKAL ELEKTRIKAL

II TRANSMISI DAN DISTRIBUSI

JUMLAH ( B )

JUMLAH ( A ) + ( B )

PPN 10 %

TOTAL JUMLAH (A) + (B) + PPN 10%

DIBULATKAN
Terbilang : Delapan Ratus Tujuh Puluh Empat Juta Sembilan Ratus Sembilan Puluh Delapan Ribu Rupiah

Mengetahui / Menyetujui :
REKAPITULASI
ENCANA ANGGARAN BIAYA

ANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH)


ANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) DI PEDESAAN
MERAGUN KECAMATAN NANGA TAMAN KABUPATEN SEKADAU

JUMLAH HARGA
(Rp.)
3

946,342.52

120,509,145.94

25,325,667.29

165,368,520.88

61,933,395.54

38,320,501.34

412,403,573.51

203,000,000.00

180,050,000.00

383,050,000.00

795,453,573.51

79,545,357.35

874,998,930.86

874,998,000.00
Sembilan Ratus Sembilan Puluh Delapan Ribu Rupiah

Sekadau, Mei 2012

Dibuat Oleh :
R E N CANA AN G GARAN B IAYA
PROGRAM : PEMBINAAN DAN PENGEMBANGAN BIDANG KETENAGALISTRIKAN
KEGIATAN : PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH)
PEKERJAAN : PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) DI PEDESAAN
LOKASI : DUSUN SANGKE DESA MERAGUN KECAMATAN NANGA TAMAN KABUPATEN SEKADAU
SUMBER BIAYA : DAK/DAU
TAHUN ANGGARAN : 2012

HARGA JUMLAH
KODE
NO URAIAN JENIS PEKERJAAN SATUAN VOLUME SAT UAN H A R G A
ANALISA
(Rp.) (Rp.)
1 2 3 4 5 6
A PEKERJAAN KONSTRUKSI SIPIL
I. PEKERJAAN PERSIAPAN
1 Mobilisasi/Demobilisasi
2 Pembersihan Lapangan dan Perataan M2 1,120.00 666.38 746,342.52
3 Pengukuran dan Pemasangan Bowplank M1 40.00 5,000.00 200,000.00
946,342.52
II. PEKERJAAN BENDUNG/INTEK
1 Galian Tanah Cadas M3 72.00 163,217.66 11,751,671.25
2 Pondasi Cor Beton K-225 M 3
31.50 1,505,770.81 47,431,780.59
3 Bendung Cor Beton K-225 M 3
28.99 1,505,770.81 43,646,649.21
4 Pasangan Batu 1 : 2 M 3
6.75 1,326,066.16 8,950,946.55
5 Plesteran 1:2 dan Acian M2 113.25 44,101.27 4,994,468.69
6 Urugan Tanah Kembali M3 14.40 21,324.07 307,066.64
7 Pintu Kuras Air Bh 1.00 3,426,563.00 3,426,563.00
120,509,145.94
IV. PEKERJAAN BAK PENENANG
1 Cor Beton K-225 M3 9.18 1,505,770.81 13,822,976.06
2 Plesteran 1:2 dan Acian M 2
45.90 44,101.27 2,024,248.24
3 Pintu Air Set 1.00 3,426,563.00 3,426,563.00
4 Saringan Set 1.00 5,400,000.00 5,400,000.00
5 Pipa Penguras 4 inc M1 6.00 61,980.00 371,880.00
6 Elbow 4 inc bh 1.00 80,000.00 80,000.00
7 Stop Kran 4 inc bh 1.00 200,000.00 200,000.00
25,325,667.29
V. PEKERJAAN PIPA PESAT
1 Galian Tanah Cadas M3 37.50 163,217.66 6,120,662.11
2 Pasangan Batu 1 : 2 M 3
9.12 1,326,066.16 12,093,723.35
3 Plesteran 1:2 dan Acian M 2
76.00 44,101.27 3,351,696.43
4 Pipa Pesat dia 12 inc M 1
150.00 846,326.00 126,948,900.00
5 Pipe Conduit 12 inct bh 1.00 500,000.00 500,000.00
6 Clamp Pipa Pesat Set 38.00 100,000.00 3,800,000.00
7 Lem PVC Klg 3.00 59,513.00 178,539.00
8 Pembungkus Pipa PVC M2 225.00 55,000.00 12,375,000.00
165,368,520.88
VI. RUMAH PEMBANGKIT&DUDUKAN TURBIN
1 Galian Tanah M3 20.00 150,000.00 3,000,000.00
2 Pasangan Batu Kali (Saluran Pembuangan dan Pondasi) M 3
4.80 1,326,066.16 6,365,117.55
3 Cor Beton Bertulang (Kolom & Balok) M 3
3.00 3,505,770.81 10,517,312.44
4 Pasangan Batako M 2
56.00 412,467.52 23,098,180.88
5 Plesteran 1:2 dan Acian M2 112.00 44,101.27 4,939,342.10
6 Pek Pasangan Gerendel Pintu Set 1.00 39,210.81 39,210.81
7 Pek Pasangan Kunci Pintu Bh 1.00 48,004.51 48,004.51
8 Pek Pasangan Pintu Panel Bh 1.00 750,000.00 750,000.00
9 Pek Pesangan Engsel Pintu Set 2.00 48,004.51 96,009.02
10 Pengecatan Tembok M2 112.00 36,582.17 4,097,202.96
11 Pekerjaan Jendela Bh 1.00 150,000.00 150,000.00
12 Pemasangan Kuda-kuda M3 0.42 7,577,009.00 3,200,528.60
13 Pasangan Atapseng BJLS M2 33.00 83,301.02 2,748,933.66
14 Pasangan Perabung M 1
6.00 97,383.30 584,299.82
15 Ventilasi M 2
2.00 100,000.00 200,000.00
16 Pasangan List Plank Papan M 1
22.00 95,420.60 2,099,253.20
61,933,395.54
VII TANGGA INSPEKS
1 Galian Tanah Cadas M3 60.00 163,217.66 9,793,059.38
2 Pondasi Cor Beton K-225 M 3
17.50 1,505,770.81 26,350,989.22
4 Pengecatan cat minyak M 2
52.50 36,582.17 1,920,563.89
6 Urugan Tanah Kembali M 3
12.00 21,324.07 255,888.86
38,320,501.34
JUMLAH PEKERJAAN SIPIL ( A ) 412,403,573.51

B PEKERJAAN MEKANIKAL ELEKTRIKAL


I PERALATAN MEKANIKAL ELEKTRIKAL
1 Turbin Crossflow lengkap 1.00 90,000,000.00 90,000,000.00
2 Generator (Brushess, 3Ø Sinkronus Alternator + AVR) 1.00 30,000,000.00 30,000,000.00
3 Kontrol , Electronic Load Control 1.00 50,000,000.00 50,000,000.00
4 Ballast Load 1.00 20,000,000.00 20,000,000.00
5 Transmisi Mekanik + Aksesoris 1.00 5,000,000.00 5,000,000.00
6 Erektion 1.00 3,000,000.00 3,000,000.00
7 Grounding, wiring, penangkal petir 1.00 2,000,000.00 2,000,000.00
8 Tool Kits 1.00 3,000,000.00 3,000,000.00
203,000,000.00
II TRANSMISI DAN DISTRIBUSI
1 Tiang Beton (6 m) Lokal 81.00 400,000.00
32,400,000.00
2 Kabel Twisted 3 x 35 + 1 x 25 4,000.00 31,350.00
125,400,000.00
3 Aksesories 81.00 200,000.00
16,200,000.00
4 Erection 81.00 50,000.00
4,050,000.00
5 Persiapan Uji Coba (Comisioning) 1.00 2,000,000.00
2,000,000.00
180,050,000.00
JUMLAH PEKERJAAN MEKANIKAL ELEKTRIKAL (B) 383,050,000.00
TOTAL 795,453,573.51
P L T L
Pembersihan Lapangan dan Perataan
Bendung 20 6 120
Penstok 150 2 300
Power House 10 10 100
Tangga Inspeksi 200 3 600
1120
Bouplank
Bendung 20 6
Power House 10 10

PEKERJAAN BENDUNG
Galian Tanah Cadas 20 6 0.6
Pondasi Cor Beton K-225 15 3.5 0.6
Bendung Cor Beton K-225 13.65 1.15 1.5
Sayap Bendung 8 0.4 1.7
Pasangan Batu 1 : 2 15 1.5 0.3
Plesteran 1:2 dan Acian 15 7.55 113.25
Urugan Tanah Kembali 20%

PEKERJAAN BAK PENENANG


Intake Cor Beton K-225 13.5 0.4 1.7
Plesteran 1:2 dan Acian 27 1.7 45.9
Urugan Tanah Kembali
Pintu Air

PEKERJAAN PIPA PESAT


Galian Tanah Cadas 150 0.5 0.5
Pasangan Batu 1 : 2 0.6 0.4 1
Plesteran 1:2 dan Acian 1.2 0.8 1 76
Pipa Pesat dia 12 inc
Pembungkus Pipa PVC 150 1.5 225

RUMAH PEMBANGKIT&DUDUKAN TURBIN


Galian Tanah 5 4 1
Pasangan Batu Kali Saluran Pembuang 14 0.3 0.5
Pasangan Batu Kali Pondasi 5 0.3 1.8
Sloop 14 0.2 0.3
Kolom Praktis 8 0.1 0.1 4
Ring Balok 14 0.2 0.3
Pondasi Turbin 2 1 0.5
Pasangan Batako 14 4 56
Plesteran 1:2 dan Acian 28 4 112
Pek Pasangan Gerendel Pintu
Pek Pasangan Kunci Pintu
Pek Pasangan Pintu Panel
Pek Pesangan Engsel Pintu
Pengecatan 3 X jalan 28 4 112
Pekerjaan Jendela 1
Ventilasi 4 1 0.5 2
Pemasangan Kuda-kuda 6 4 0.08 0.1
8 6 0.06 0.08
Pasangan Atapseng BJLS 2 6 2.75 33
Pasangan Perabung 6
Pasangan List Plank Papan 22

TANGGA INSPEKS
Galian Tanah Cadas 150 1 0.4
Pondasi Cor Beton K-225 175 1 0.1
Pengecatan cat minyak 175 0.3 52.5
Urugan Tanah Kembali
V Kel

52
40
92

72.00
31.50
23.55
5.44
6.75

14.40

9.18

37.50
9.12 37.5

20.00
2.10
2.70
0.84
0.32
0.84
1.00
0.192
0.2304

60
17.5

12
DAFTAR HARGA BAHAN DAN UPAH KE
KABUPATEN SANGGAU TAHUN ANGGARA
A. HARGA BAHAN / MATERIAL BANGUNAN

No. Jenis Bahan / Material Bangunan

1 2
I. BAHAN PASIR, BATU & TANAH ( SAND, STONE & SOIL )

1 Pasir Urug
2 Pasir Beton
3 Batu gunung atau quarry
4 Batu Quarry - Royalti
5 Kerikil galian - Royalti
6 Kerikil Sungai Royalti
7 Batu Belah ukuran 10 - 15 cm
8 Batu Belah ukuran 7 - 10 cm
9 Batu Belah ukuran 5 - 7 cm
10 Batu Belah ukuran 3 - 5 cm
11 Batu Belah ukuran 2 - 3 cm
12 Batu Belah ukuran 1 - 2 cm
13 Batu Belah ukuran 0,5 - 1 cm (Kerikil Beton)
14 Stone Dust
15 Gorong-Gorong Beton Diameter 40 Cm
16 Gorong-Gorong Beton Diameter 60 Cm
17 Gorong-Gorong Beton Diameter 80 Cm
18 Gorong-Gorong Beton Diameter 100 Cm
19 Sirtu ( Tak Ayak)
20 Sirtu - Royalti
21 timbunan Pilihan
22 Aspal Bitumen
23 Minyak Aspal
24 Minyak tanah
25 Kayu Bakar
26 Kapur Bakar
27 Cat Jembatan
28 Baja Teralis
29 Terpal
30 Kawat Bronjong
31 Baut Baja
32 Besi Profil
33 Baja Konstruksi / Profil (galvanisir Untuk jembatan )
34 Paku Jembatan
35 Besi Tulangan Beton
36 Kawat baja ( Binrat )
37 Kayu Untuk Perancah
38 Teer
39 Minyak Diesel / solar ( Harga Industri )
40 Bensin premium ( Harga Industri )
41 Minyak Pelumas / Oli
42 Beugel
43 Besi Spoor Plank
44 Timbunan Pilihan Setempat
45 Baut
46 Kayu pancang ( Dolken ) Dia. 10/15 Panjang 2,5 M
47 Bata Merah
48 Batako Cetak
49 Terawang / Rooster Batako
50 Paving Block
No. Jenis Bahan / Material Bangunan

1 2
II. BAHAN SEMEN ( CEMENT )
1 Semen PC
2 Semen Warna / Oker
III. BAHAN KAYU ( TIMBER, WOODS )
1 Kayu Belian
2 Kayu Belian ( Ketam ) 8/8
3 Kayu Kls. I
4 Kayu Kls. I ( Ketam ) 8/8
5 Kayu Kls. II
6 Papan Kayu Belian
7 Papan Kayu Belian ( Ketam )
8 Papan Kayu Kls. I
9 Papan Kayu Kls. I (Ketam )
10 Papan Kayu Kls. II
11 Papan Bekisting / Mal Kayu Kls. III
12 Papan Jalusie / Renglat Kayu Kls. I
13 Kayu Belian uk. 15 cm x 15 cm / Btg Rp. 1.015.000,-
IV. BAHAN UBIN ( TILE, CERAMIC, GRANITE, MARBLE )
1 Keramik Porselin uk. 20 x 20 Polos
2 Keramik Porselin uk. 20 x 20 Warna
3 Keramik Porselin uk. 20 x 20 Warna Anti Slip
4 Keramik Porselin uk. 20 x 25 Warna
5 Keramik Porselin uk. 30 x 30 Warna
6 Keramik Porselin uk. 30 x 30 Polos Anti Slip
7 Keramik Porselin uk. 30 x 30 Warna Anti Slip
8 Keramik Porselin uk. 40 x 40 Anti Gores ( KW 1 )
9 Keramik Porselin uk. 40 x 40 Anti Gores ( KW 2 )
10 Keramik Porselin uk. 60 x 60 Anti Gores ( KW 1 )
11 Keramik Porselin uk. 60 x 60 Unpolished
12 Lis Dinding Keramik WC uk. 8 x 20 cm
13 Lis Dinding Keramik WC uk. 10 x 40 cm
14 Porselin uk. 11 x 11 Putih
15 Porselin uk. 10 x 10 Warna
V. BAHAN LANGIT - LANGIT ( PLAFOND, ACOUSTIC )
1 Lis Profil Gypsum 8 cm
2 Lis Profil Gypsum 10 cm
3 Lis Profil Gypsum 12 cm
4 Lis Profil Gypsum 14 cm
5 Bunga Gypsum dia. 80 cm
6 Bunga Gypsum dia. 90 cm
7 Triplek tebal 3 mm
8 Triplek tebal 2 mm
9 GRC Board 3 mm
10 Gypsum Board tebal 9 mm
11 Pintu WC PVC
12 Pintu Double Alumunium
13 Pintu Panel kayu Kls. I
14 Pintu Panel Kayu Kls. II
15 Kusen Alumunium
VI. BAHAN ATAP ( ROOF )
1 Genteng Kodok / Glazuur Dengan Cat
2 Bubungan Genteng Kodok / Glazuur
3 Seng Gelombang BJLS 0,30
4 Seng Gelombang BJLS 0,20
5 Genteng Metal Warna Berpasir uk. 0.88 x 0.88 M2, tebal 0.35 mm
6 Genteng Metal Warna Polos uk. 0.88 x 0.88 M2, tebal 0.35 mm
7 Genteng Metal Warna Berpasir uk. 0.88 x 0.44 M2, tebal 0.35 mm
8 Genteng Metal Warna Polos uk. 0.88 x 0.44 M2, tebal 0.35 mm
9 Genteng Metal Multi Sirap Type Borneo uk. 7.00 x 0.50 M2, tebal 0.40 mm
10 Nok Genteng Metal Warna Berpasir uk. 1.00 x 0.91 M2, tebal 0.35 mm
11 Nok Genteng Metal Warna Polos uk. 1.00 x 0.91 M2, tebal 0.35 mm
12 Nok Genteng Metal Multi Sirap uk. 0.46 x 0.23 M2, tebal 0.40 mm
13 Seng Datar BJLS 0,30
14 Seng Datar BJLS 0,20
15 Atap Fibreglass Gelombang 3 mm
16 Pagar Besi Hollo
17 Pagar Besi Stainlish
18 Huruf Stainlish T = 8 mm
19 Huruf Stainlish T = 6 mm
No. Jenis Bahan / Material Bangunan

1 2
VII. BAHAN KACA ( GLASS )
1 Naco + Bingkai ( 80 x 15 cm ) 10 Daun Polos
2 Naco + Bingkai ( 80 x 15 cm ) 10 Daun Rayban
3 Kaca Polos 3 mm
4 Kaca Polos 5 mm
5 Kaca Warna 3 mm
6 Kaca Buram 3 mm
7 Kaca Buram Warna 3 mm
8 Kaca Rayban 3 mm
9 Kaca Rayban 5 mm
10 Kaca Cermin 3 mm
VIII. BAHAN CAT ( PAINT )
1 Amplas Kayu / Besi / Tembok
2 Dempul
3 Cat Dasar Tembok
4 Cat Dasar Kayu
5 Meni Besi
6 Cat Kilat
7 Plamur
8 Cat Khusus Tembok Luar
9 Pelitur
10 Melamic
11 Vernis
12 Minyak Cat / Thinner
13 Ter / Residu
IX. BAHAN BESI , ALUMINIUM & KAWAT ( IRON, ALUMUNIUM & WIRE )
1 Besi Simpai Kawat
2 Besi Tulangan Beton
3 Kawat Ikat Beton
4 Kawat Harmonika 1 Roll = 5.0 x 5.0 M2
5 Kawat Nyamuk / Besi
6 Kawat Nyamuk / Plastik (Kassa)
7 Kawat Ikat Beronjong / Galvanis
8 Wiremesh Besi Ulir diam. 4 mm 1 Gulung = 2.10 x 54.00 M2
9 Wiremesh Besi Ulir diam. 5 mm 1 Gulung = 2.10 x 54.00 M2
10 Wiremesh Besi Ulir diam. 6 mm 1 Gulung = 2.10 x 54.00 M2
11 Multi Truss ( Rangka Atap Baja Ringan ) bentang < 12.00 M
12 Besi Plat T = 1.00 mm L = 2 cm ( Besi Strip )
13 Beugel
14 Alumunium Foil uk. 60,00 x 1,25 M2
15 Alumunium Tape
X. BAHAN PENGGANTUNG, KUNCI & PEREKAT ( NAILS, KEYS & GLUE )
1 Paku Campuran 1" - 5 "
2 Paku Atap Seng / Paku Payung
3 Paku Genteng Metal Multi Sirap
4 Paku Gypsum
5 Paku Sekrup
6 Paku Beton
7 Paku Tripleks
8 Sekrup / Baut / Mur
9 Baut Besar
10 Kunci Pintu Tanam Antik
11 Kunci Pintu Tanam
12 Kunci Pintu Tanam KM / WC
13 Kunci Silinder
14 Kunci Lemari
No. Jenis Bahan / Material Bangunan

1 2
15 Selot Pintu
16 Selot Jendela
17 Engsel Pintu Biasa
18 Engsel Jendela Biasa
19 Engsel Pintu Kuningan
20 Engsel Jendela Kuningan
21 Kait Angin
22 Handle Pintu & Jendela
23 Lem Kayu / Tripleks
24 Lem PVC
25 Lem Genteng Metal Multi Sirap
26 Seal Tape
XI. BAHAN SANITAIR ( SANITARY )
1 Kloset Duduk / Monoblok
2 Kloset Jongkok Standar
3 Urinoir
4 Bidet
5 Wastafel Keramik
6 Bak Mandi Fibreglass
7 Badkip / Bathtub Porselin Panjang
8 Badkip / Bathtub Porselin Sudut
9 Bak Air Fibreglass vol. 1 m3
10 Bak Cuci Piring Stainless Steel Double
11 Water Drain + Acessories
12 Shower ( Tray )
13 Tempat Sabun / Soap Dish 1 lubang
14 Kran Air Lokal 3/4 "
15 Floor Drain
16 Pemanas Air / Water Heater + Lapisan Anti Karat kap. 15 liter
XII. BAHAN PIPA ( PIPES )
1 Pipa GIP class medium diameter 200 mm ( 8 " )
2 Pipa GIP class medium diameter 150 mm ( 6 " )
3 Pipa GIP class medium diameter 100 mm ( 4 " )
4 Pipa GIP class medium diameter 75 mm ( 3 " )
5 Pipa GIP class medium diameter 50 mm ( 2 " )
6 Pipa PVC S - 12,5 RRJ diameter 630mm ( 24 " )
7 Pipa PVC S - 12,5 RRJ diameter 500 mm ( 20 " )
8 Pipa PVC S - 12,5 RRJ diameter 450 mm ( 18 " )
9 Pipa PVC S - 12,5 RRJ diameter 400 mm ( 16 " )
10 Pipa PVC S - 12,5 RRJ diameter 355 mm ( 14 " )
11 Pipa PVC S - 12,5 RRJ diameter 300 mm ( 12 " )
12 Pipa PVC S - 12,5 RRJ diameter 275 mm ( 11 " )
13 Pipa PVC S - 12,5 RRJ diameter 250 mm ( 10 " )
14 Pipa PVC S - 12,5 RRJ diameter 225 mm ( 9 " )
15 Pipa PVC S - 12,5 RRJ diameter 200 mm ( 8 " )
16 Pipa PVC S - 12,5 RRJ diameter 150 mm ( 6 " )
17 Pipa PVC S - 12,5 RRJ diameter 125 mm ( 5 " )
18 Pipa PVC S - 12,5 RRJ diameter 100 mm ( 4 " )
19 Pipa PVC S - 12,5 RRJ diameter 75 mm ( 3 " )
20 Pipa PVC S - 12,5 RRJ diameter 65 mm ( 2,5 " )
21 Pipa PVC S - 12,5 RRJ diameter 50 mm ( 2 " )
22 Pipa PVC Tipe AW diameter 250 mm ( 10 " )
23 Pipa PVC Tipe AW diameter 200 mm ( 8 " )
24 Pipa PVC Tipe AW diameter 150 mm ( 6 " )
25 Pipa PVC Tipe AW diameter 125 mm ( 5 " )
26 Pipa PVC Tipe AW diameter 100 mm ( 4 " )
27 Pipa PVC Tipe AW diameter 75 mm ( 3 " )
28 Pipa PVC Tipe AW diameter 50 mm ( 2 " )
29 Pipa PVC Tipe AW diameter 40 mm ( 1,5 " )
30 Pipa PVC Tipe AW diameter 25 mm ( 1 " )
31 Pipa PVC Tipe AW diameter 18.75 mm ( 3/4 " )
32 Pipa PVC Tipe AW diameter 12.5 mm ( 1/2 " )
33 Pipa Flexibel diameter 150 mm ( 6 " )
34 Pipa Flexibel diameter 100 mm ( 4 " )
No. Jenis Bahan / Material Bangunan

1 2
XIII. ASESORI PIPA TRANSMISI & DISTRIBUSI ( PIPE'S ACESSORIES )
1 All Socket Tee PVC dia 200 x 200 mm
2 All Socket Tee PVC dia 200 x 160 mm
3 All Socket Tee PVC dia 200 x 110 mm
4 All Socket Tee PVC dia 200 x 90 mm
5 All Socket Tee PVC dia 150 x 150 mm
6 All Socket Tee PVC dia 150 x 100 mm
7 All Socket Tee PVC dia 160 x 90 mm
8 All Socket Tee PVC dia 150 x 75 mm
9 All Socket Tee PVC dia 110 x 90 mm
10 All Socket Tee PVC dia 100 x 50 mm
11 All Socket Tee PVC dia 75 x 75 mm
12 All Socket Tee PVC dia 75 x 50 mm
13 All Socket Tee PVC dia 50 x 50 mm
All Flanged Gate Valve dia 250 mm
14 All Flanged Gate Valve dia 200 mm
15 All Flanged Gate Valve dia 150 mm
16 All Flanged Gate Valve dia 100 mm
All Flanged Gate Valve dia 75 mm
All Flanged Gate Valve dia 50 mm
17 All Flanged Spigot PVC dia 300 mm
18 All Flanged Spigot PVC dia 250 mm
19 All Flanged Spigot PVC dia 200 mm
20 All Flanged Spigot PVC dia 160 mm
21 All Flanged Spigot PVC dia 110 mm
22 All Flanged Spigot PVC dia 90 mm
23 All Flanged Spigot PVC dia 63 mm
24 All Flange Bend GIP 45 x 150 mm
25 All Flange Bend GIP 90 x 150 mm
26 All Socket Bend PVC dia 315 mm 90°
27 All Socket Bend PVC dia 250 mm 90°
All Socket Bend PVC dia 250 mm 45°
All Socket Bend PVC dia 250 mm 22,5°
28 All Socket Bend PVC dia 200 mm 90°
All Socket Bend PVC dia 200 mm 45°
All Socket Bend PVC dia 200 mm 22,5°
29 All Socket Bend PVC dia 160 mm 90°
All Socket Bend PVC dia 160 mm 45°
All Socket Bend PVC dia 160 mm 22,5°
30 All Socket Bend PVC dia 140 mm 90°
All Socket Bend PVC dia 140 mm 45°
All Socket Bend PVC dia 140 mm 22,5°
31 All Socket Bend PVC dia 110 mm 90°
All Socket Bend PVC dia 110 mm 45°
32 All Socket Bend PVC dia 90 mm 90°
All Socket Bend PVC dia 90 mm 45°
33 All Socket Bend PVC dia 75 mm 90°
All Socket Bend PVC dia 75 mm 45°
34 All Socket Bend PVC dia 63 mm 90°
All Socket Bend PVC dia 63 mm 45°
Flage Socket PVC Diameter 100 mm
Flage Socket PVC Diameter 75 mm
Flage Socket PVC Diameter 50 mm
35 All Flange Reducer GIP diam. 250 x 200 mm
All Flange Reducer GIP diam. 250 x 150 mm
All Flange Reducer GIP diam. 200 x 150 mm
All Flange Reducer GIP diam. 200 x 100 mm
All Flange Reducer GIP diam. 150 x 100 mm
36 All Flange Reducer PVC dia 315 x 250 mm
37 All Flange Reducer PVC dia 250 x 200 mm
38 All Flange Reducer PVC dia 200 x 150 mm
All Flange Reducer PVC dia 200 x 100 mm
39 All Flange Reducer PVC dia 160 x 110 mm
40 All Flange Reducer PVC dia 110 x 90 mm
41 All Flange Reducer PVC dia 110 x 63 mm
42 All Flange Reducer PVC dia 90 x 63 mm
XIII. ASESORI PIPA TRANSMISI & DISTRIBUSI ( PIPE'S ACESSORIES )
Bend 90° GIP Diameter 250 mm
Bend 45° GIP Diameter 250 mm
Bend 22,5° GIP Diameter 250 mm
Bend 90° GIP Diameter 200 mm
Bend 45° GIP Diameter 200 mm
Bend 22,5° GIP Diameter 200 mm
Bend 90° GIP Diameter 150 mm
Bend 45° GIP Diameter 150 mm
Bend 22,5° GIP Diameter 150 mm
Bend 90° GIP Diameter 100 mm
Bend 45° GIP Diameter 100 mm
Bend 90° GIP Diameter 75 mm
Bend 45° GIP Diameter 75 mm
Bend 90° GIP Diameter 50 mm
Bend 45° GIP Diameter 50 mm
43 Flange GIP diam. 50 mm
44 Flange GIP diam. 75 mm
45 Flange GIP diam. 100 mm
46 Flange GIP diam. 150 mm
47 Flexibel Joint diam. 150 mm
XIV. BAHAN TANKI AIR UNTUK HIDRAN UMUM ( WATER TANKS )
1 Hidran Umum Polyethylene ( PE ) vol. 1,0 m3
2 Hidran Umum Polyethylene ( PE ) vol. 2,0 m3
3 Hidran Umum Polyethylene ( PE ) vol. 3,0 m3
4 Hidran Umum Fibreglass ( FRP ) vol. 1,0 m3
5 Hidran Umum Fibreglass ( FRP ) vol. 2,0 m3
6 Hidran Umum Fibreglass ( FRP ) vol. 3,0 m3
7 Water Meter
Jenis Bahan / Material Bangunan
No.

1 2
XV. BAHAN ELEKTRIKAL ( ELECTRICAL, CABLES, LAMPS )
1 Sekring Biasa
2 Sekring Otomatic 16 A ( Jerman )
3 Stop Kontak
4 Saklar
5 Lampu Pijar 10 Watt
6 Lampu Pijar 25 Watt
7 Lampu Pijar 60 Watt
8 Lampu Neon (TL) 10 Watt
9 Lampu Neon (TL) 20 Watt
10 Lampu Kap Baret
11 Lampu Sorot Lengkap 120 Watt
12 Lampu SL 18 Watt
13 Lampu SL 20 Watt
14 Lampu SL 50 Watt

B. UPAH KERJA

No. Jenis Pekerja / Tukang

1 2
1 Pekerja
2 Mandor
3 Kepala Tukang
4 Tukang Kayu
5 Tukang Semen
6 Tukang Batu
7 Tukang Besi
8 Tukang Pipa
9 Tukang Cat
1 2
1 Mandor lapangan L061
2 Mekanik L071
3 Mekanik pembantu L072
4 Tukang kepala L073
5 Tukang L079
6 Operator terlatih L081
7 Operator kurang terlatih L082
8 Pembantu operator L083
9 Supir material L091
10 Supir personil L092
11 Pembantu sopir / kernet L099
12 Buruh lapangan tak terlatih L101
13 Buruh lapangan semi terlatih L103
14 Buruh lapangan terlatih L106
GA BAHAN DAN UPAH KERJA
NGGAU TAHUN ANGGARAN 2011

Harga Bahan
Satuan Tanpa Jasa & Pajak Dengan Jasa & Pajak
(Rp.) (Rp.)
3 4 5
& SOIL )

M3 72,500.00 90,625.00
M3 72,500.00 90,625.00
M3 110,000.00 137,500.00
M3 110,000.00 137,500.00
M3 125,000.00 156,250.00
M3 150,000.00 187,500.00
M3 228,571.00 285,713.75
M3 257,143.00 321,428.75
M3 275,000.00 343,750.00
M3 425,000.00 531,250.00
M3 512,000.00 640,000.00
M3 515,000.00 643,750.00
M3 550,000.00 687,500.00
M3 440,000.00 550,000.00
M' 335,000.00 418,750.00
M' 525,000.00 656,250.00
M' 650,000.00 812,500.00
M' 975,000.00 1,218,750.00
M3 72,500.00 90,625.00
M3 84,166.67 105,208.34
M3 21,600.00 27,000.00
Kg 10,350.00 12,937.50
Lt 1,500.00 1,875.00
Lt 3,750.00 4,687.50
M3 60,000.00 75,000.00
M3 6,000.00 7,500.00
Kg 27,500.00 34,375.00
Kg 9,300.00 11,625.00
M 12,000.00 15,000.00
Kg 25,000.00 31,250.00
Buah 21,000.00 26,250.00
Kg 16,000.00 20,000.00
Kg 32,000.00 40,000.00
Kg 22,500.00 28,125.00
Kg 9,900.00 12,375.00
Kg 25,000.00 31,250.00
M3 350,000.00 437,500.00
Lt 6,000.00 7,500.00
Lt 7,977.00 9,971.25
Lt 9,747.00 12,183.75
Lt 27,000.00 33,750.00
Batang 22,500.00 28,125.00
Buah 22,500.00 28,125.00
M3 21,600.00 27,000.00
Buah 6,500.00 8,125.00
Batang 9,600.00 12,000.00
Buah 1,300.00 1,625.00
Buah 1,200.00 1,500.00
Buah 1,600.00 2,000.00
Buah 1,650.00 2,062.50
Harga Bahan
Satuan Tanpa Jasa & Pajak Dengan Jasa & Pajak
(Rp.) (Rp.)
3 4 5

50 Kg / Zak 75,000.00 93,750.00


Kg 7,500.00 9,375.00

M3 7,750,000.00 9,687,500.00
M3 9,690,000.00 12,112,500.00
M3 4,030,000.00 5,037,500.00
M3 5,130,000.00 6,412,500.00
M3 3,410,000.00 4,262,500.00
M3 7,750,000.00 9,687,500.00
M3 9,690,000.00 12,112,500.00
M3 4,485,000.00 5,606,250.00
M3 4,830,000.00 6,037,500.00
M3 4,140,000.00 5,175,000.00
M3 2,553,000.00 3,191,250.00
M3 3,300,000.00 4,125,000.00
M3 11,165,000.00 13,956,250.00
BLE )
Kotak 40,000.00 50,000.00
Kotak 42,000.00 52,500.00
Kotak 45,000.00 56,250.00
Kotak 54,000.00 67,500.00
Kotak 51,200.00 64,000.00
Kotak 50,000.00 62,500.00
Kotak 60,000.00 75,000.00
Kotak 115,000.00 143,750.00
Kotak 100,000.00 125,000.00
Kotak 160,000.00 200,000.00
Kotak 146,000.00 182,500.00
Buah 3,800.00 4,750.00
Buah 15,000.00 18,750.00
M2 42,500.00 53,125.00
M2 45,000.00 56,250.00
)
M' 9,000.00 11,250.00
M' 10,500.00 13,125.00
M' 11,000.00 13,750.00
M' 11,000.00 13,750.00
Buah 300,000.00 375,000.00
Buah 375,000.00 468,750.00
Lembar 55,000.00 68,750.00
Lembar 42,000.00 52,500.00
Lembar 57,500.00 71,875.00
Lembar 67,500.00 84,375.00
Buah 250,000.00 312,500.00
Buah 800,000.00 1,000,000.00
Buah 800,000.00 1,000,000.00
Buah 650,000.00 812,500.00
M' 85,000.00 106,250.00

Buah 2,500.00 3,125.00


Buah 5,500.00 6,875.00
Lembar 65,500.00 81,875.00
Lembar 37,500.00 46,875.00
Buah/2 susun 70,000.00 87,500.00
Buah/2 susun 60,000.00 75,000.00
Buah/1 susun 36,000.00 45,000.00
Buah/1 susun 25,500.00 31,875.00
Buah 240,000.00 300,000.00
Buah 70,000.00 87,500.00
Buah 65,000.00 81,250.00
Buah 48,000.00 60,000.00
Lembar 66,500.00 83,125.00
Lembar 38,000.00 47,500.00
Lembar 67,500.00 84,375.00
M' 450,000.00 562,500.00
M' 650,000.00 812,500.00
Cm 8,500.00 10,625.00
Cm 7,000.00 8,750.00
Harga Bahan
Satuan Tanpa Jasa & Pajak Dengan Jasa & Pajak
(Rp.) (Rp.)
3 4 5

Set 250,000.00 312,500.00


Set 260,000.00 325,000.00
M2 90,000.00 112,500.00
M2 120,000.00 150,000.00
M2 150,000.00 187,500.00
M2 175,000.00 218,750.00
M2 200,000.00 250,000.00
M2 110,000.00 137,500.00
M2 145,000.00 181,250.00
M2 225,000.00 281,250.00

Lembar 2,500.00 3,125.00


Kg 23,000.00 28,750.00
Kaleng/5kg 35,000.00 43,750.00
Kg 27,000.00 33,750.00
Kg 27,000.00 33,750.00
Kg 33,000.00 41,250.00
Kg 42,500.00 53,125.00
Kaleng/5ltr 90,000.00 112,500.00
Liter 45,000.00 56,250.00
Liter 55,000.00 68,750.00
Liter 37,500.00 46,875.00
Liter 15,000.00 18,750.00
Liter 42,300.00 52,875.00
UMUNIUM & WIRE )
Kg 16,000.00 20,000.00
Kg 9,900.00 12,375.00
Kg 20,000.00 25,000.00
Roll 350,000.00 437,500.00
M2 13,000.00 16,250.00
M2 18,000.00 22,500.00
Kg 25,000.00 31,250.00
Gulung 2,000,000.00 2,500,000.00
Gulung 2,400,000.00 3,000,000.00
Gulung 3,040,000.00 3,800,000.00
M2 288,000.00 360,000.00
Batang 9,618.00 12,022.50
Batang 22,500.00 28,125.00
M2 7,500.00 9,375.00
Roll 75,000.00 93,750.00
AILS, KEYS & GLUE )
Kg 15,000.00 18,750.00
Kg 20,000.00 25,000.00
Kg 17,000.00 21,250.00
Kg 29,000.00 36,250.00
Buah 6,000.00 7,500.00
Kotak/100 Bh 20,000.00 25,000.00
Kg 26,000.00 32,500.00
Kg 2,500.00 3,125.00
Buah 6,500.00 8,125.00
Buah 200,000.00 250,000.00
Buah 175,000.00 218,750.00
Buah 36,300.00 45,375.00
Buah 36,500.00 45,625.00
Buah 12,500.00 15,625.00
Harga Bahan

Satuan Tanpa Jasa & Pajak Dengan Jasa & Pajak


(Rp.) (Rp.)
3 4 5
Buah 13,500.00 16,875.00
Buah 5,000.00 6,250.00
Buah 7,000.00 8,750.00
Buah 6,000.00 7,500.00
Buah 12,500.00 15,625.00
Buah 10,000.00 12,500.00
Buah 7,500.00 9,375.00
Buah 5,000.00 6,250.00
Kg 37,500.00 46,875.00
Kg 46,500.00 58,125.00
Cup 20,000.00 25,000.00
Buah 5,000.00 6,250.00

Buah 1,375,000.00 1,718,750.00


Buah 150,000.00 187,500.00
Buah 950,000.00 1,187,500.00
Buah 0.00 0.00
Buah 475,000.00 593,750.00
Buah 1,500,000.00 1,875,000.00
Buah 2,750,000.00 3,437,500.00
Buah 7,200,000.00 9,000,000.00
Buah 1,400,000.00 1,750,000.00
Buah 366,250.00 457,812.50
Set 375,000.00 468,750.00
Buah 85,000.00 106,250.00
Buah 37,500.00 46,875.00
Buah 12,500.00 15,625.00
Buah 17,500.00 21,875.00
Buah 1,850,000.00 2,312,500.00

M' 233,500.00 291,875.00


M' 188,000.00 235,000.00
M' 151,000.00 188,750.00
M' 117,000.00 146,250.00
M' 55,000.00 68,750.00
M' 2,394,750.00 2,993,437.50
M' 1,506,700.00 1,883,375.00
M' 1,385,550.00 1,731,937.50
M' 933,000.00 1,166,250.00
M' 724,500.00 905,625.00
M' 575,000.00 718,750.00
M' 312,750.00 390,937.50
M' 402,500.00 503,125.00
M' 322,500.00 403,125.00
M' 279,600.00 349,500.00
M' 154,000.00 192,500.00
M' 118,000.00 147,500.00
M' 78,500.00 98,125.00
M' 49,200.00 61,500.00
M' 33,750.00 42,187.50
M' 24,100.00 30,125.00
M' 176,500.00 220,625.00
M' 119,500.00 149,375.00
M' 91,250.00 114,062.50
M' 76,000.00 95,000.00
M' 47,250.00 59,062.50
M' 28,350.00 35,437.50
M' 14,500.00 18,125.00
M' 11,250.00 14,062.50
M' 6,250.00 7,812.50
M' 4,500.00 5,625.00
M' 4,500.00 5,625.00
M' 166,700.00 208,375.00
M' 166,700.00 208,375.00
Harga Bahan

Satuan Tanpa Jasa & Pajak Dengan Jasa & Pajak


(Rp.) (Rp.)
3 4 5
PE'S ACESSORIES )
Buah 1,000,000.00 1,250,000.00
Buah 850,000.00 1,062,500.00
Buah 750,000.00 937,500.00
Buah 600,000.00 750,000.00
Buah 581,800.00 727,250.00
Buah 504,800.00 631,000.00
Buah 900,000.00 1,125,000.00
Buah 800,000.00 1,000,000.00
Buah 320,000.00 400,000.00
Buah 275,000.00 343,750.00
Buah 200,000.00 250,000.00
Buah 175,000.00 218,750.00
Buah 130,000.00 162,500.00
Buah 4,200,000.00 5,250,000.00
Buah 2,782,500.00 3,478,125.00
Buah 1,575,000.00 1,968,750.00
Buah 787,500.00 984,375.00
Buah 630,000.00 787,500.00
Buah 420,000.00 525,000.00
Buah 1,100,000.00 1,375,000.00
Buah 1,890,000.00 2,362,500.00
Buah 1,365,000.00 1,706,250.00
Buah 840,000.00 1,050,000.00
Buah 400,000.00 500,000.00
Buah 287,500.00 359,375.00
Buah 172,500.00 215,625.00
Buah 660,000.00 825,000.00
Buah 800,000.00 1,000,000.00
Buah 1,379,300.00 1,724,125.00
Buah 1,365,000.00 1,706,250.00
Buah 1,050,000.00 1,312,500.00
Buah 945,000.00 1,181,250.00
Buah 735,000.00 918,750.00
Buah 630,000.00 787,500.00
Buah 525,000.00 656,250.00
Buah 420,000.00 525,000.00
Buah 0.00 0.00
Buah 0.00 0.00
Buah 0.00 0.00
Buah 0.00 0.00
Buah 0.00 0.00
Buah 185,000.00 231,250.00
Buah 105,000.00 131,250.00
Buah 55,400.00 69,250.00
Buah 0.00 0.00
Buah 37,850.00 47,312.50
Buah 0.00 0.00
Buah 31,500.00 39,375.00
Buah 26,500.00 33,125.00
Buah 472,500.00 590,625.00
Buah 367,500.00 459,375.00
Buah 236,500.00 295,625.00
Buah 0.00 0.00
Buah 420,000.00 525,000.00
Buah 0.00 0.00
Buah 0.00 0.00
Buah 275,000.00 343,750.00
Buah 580,200.00 725,250.00
Buah 420,000.00 525,000.00
Buah 262,500.00 328,125.00
Buah 302,000.00 377,500.00
Buah 126,000.00 157,500.00
Buah 80,000.00 100,000.00
Buah 70,000.00 87,500.00
Buah 46,050.00 57,562.50
PE'S ACESSORIES )
Buah 577,500.00 721,875.00
Buah 0.00 0.00
Buah 0.00 0.00
Buah 294,000.00 367,500.00
Buah 0.00 0.00
Buah 0.00 0.00
Buah 0.00 0.00
Buah 0.00 0.00
Buah 0.00 0.00
Buah 50,000.00 62,500.00
Buah 0.00 0.00
Buah 0.00 0.00
Buah 0.00 0.00
Buah 0.00 0.00
Buah 0.00 0.00
Buah 30,000.00 37,500.00
Buah 33,000.00 41,250.00
Buah 40,000.00 50,000.00
Buah 75,000.00 93,750.00
Buah 1,280,000.00 1,600,000.00
WATER TANKS )
Unit 2,925,000.00 3,656,250.00
Unit 5,680,000.00 7,100,000.00
Unit 7,530,000.00 9,412,500.00
Unit 1,700,000.00 2,125,000.00
Unit 2,800,000.00 3,500,000.00
Unit 3,800,000.00 4,750,000.00
Unit 365,000.00 456,250.00
Harga Bahan

Satuan Tanpa Jasa & Pajak Dengan Jasa & Pajak

(Rp.) (Rp.)
3 4 5
LAMPS )
Buah 25,000.00 31,250.00
Buah 18,000.00 22,500.00
Buah 15,000.00 18,750.00
Buah 15,600.00 19,500.00
Buah 4,800.00 6,000.00
Buah 6,000.00 7,500.00
Buah 6,000.00 7,500.00
Set 10,100.00 12,620.00
Set 12,000.00 15,000.00
Set 132,000.00 165,000.00
Set 156,000.00 195,000.00
Buah 30,000.00 37,500.00
Buah 35,000.00 43,750.00
Buah 95,000.00 118,750.00

Upah Kerja

Satuan Tanpa Jasa & Pajak Dengan Jasa & Pajak

(Rp.) (Rp.)
3 4 5
Org / Hari 70,950.00 88,687.50
Org / Hari 98,230.00 122,787.50
Org / Hari 91,630.00 114,537.50
Org / Hari 77,990.00 97,487.50
Org / Hari 77,990.00 97,487.50
Org / Hari 77,990.00 97,487.50
Org / Hari 77,990.00 97,487.50
Org / Hari 77,990.00 97,487.50
Org / Hari 77,990.00 97,487.50
3 4 5
Org / Hari 75,600.00 94,500.00
Org / Hari 63,000.00 78,750.00
Org / Hari 59,000.00 73,750.00
Org / Hari 63,000.00 78,750.00
Org / Hari 59,000.00 73,750.00
Org / Hari 63,000.00 78,750.00
Org / Hari 59,000.00 73,750.00
Org / Hari 55,000.00 68,750.00
Org / Hari 63,000.00 78,750.00
Org / Hari 60,000.00 75,000.00
Org / Hari 52,500.00 65,625.00
Org / Hari 45,000.00 56,250.00
Org / Hari 47,500.00 59,375.00
Org / Hari 53,000.00 66,250.00
DAFTAR HARGA UPAH KERJA

A. UPAH KERJA

No Jenis Pekerja / Tukang

1 2
1 Pekerja
2 Mandor
3 Kepala Tukang
4 Tukang Kayu
5 Tukang Semen
6 Tukang Batu
7 Tukang Besi
8 Tukang Pipa
9 Tukang Cat

A. HARGA BAHAN / MATERIAL BANGUNAN


No. Jenis Bahan / Material Bangunan

1 2

1 Batako
2 Batu 0,5 - 1 (Kerikil Beton)
3 Batu Belah 10 - 15 cm
4 Baut
5 Besi Strip
6 Cat Dasar Tembok
7 Cat Tembok
8 Kayu Kelas I (Ketam)
9 Kayu Kelas II
10 Paku
11 Paku Payung
12 Papan Kayu Kelas I (Ketam)
13 Papan Kayu Klas II
14 Pasir Beton/Pasang
15 Plamur
16 Semen Portland
17 Seng Datar BJLS 0,20
18 Seng Gelombang BJLS 0,20
19 Ensel Pintu
20 Gerendel Pintu
21 Kunci Tanam Biasa
22 Turbin Crossflow lengkap
23 Generator (Brushess, 3Ø Sinkronus Alternator + AVR)
24 Kontrol , Electronic Load Control
25 Ballast Load
26 Transmisi Mekanik + Aksesoris
27 Grounding, wiring, penangkal petir
28 Tool Kits
29 Tiang Beton
30 Kabel Twisted 3 x 35 + 1 x 25
31 Aksesories
32 Persiapan Uji Coba (Comisioning)
33 Saringan
34 Pipa PVC 4 inc (Penguras)
35 Elbow 4 inc
36 Stop Kran 4 inc
37 Pipa PVC dia 12 inc (Pipa Pesat)
Besi Beton (Polos/Ulir)
Kawat Ikat Beton
No. Jenis Bahan / Material Bangunan

1 2
II. BAHAN SEMEN ( CEMENT )
1 Semen PC
2 Semen Warna / Oker
III. BAHAN KAYU ( TIMBER, WOODS )
1 Kayu Belian
2 Kayu Belian ( Ketam ) 8/8
3 Kayu Kls. I
4 Kayu Kls. I ( Ketam ) 8/8
5 Kayu Kls. II
6 Papan Kayu Belian
7 Papan Kayu Belian ( Ketam )
8 Papan Kayu Kls. I
9 Papan Kayu Kls. I (Ketam )
10 Papan Kayu Kls. II
11 Papan Bekisting / Mal Kayu Kls. III
12 Papan Jalusie / Renglat Kayu Kls. I
13 Kayu Belian uk. 15 cm x 15 cm / Btg Rp. 1.015.000,-
IV. BAHAN UBIN ( TILE, CERAMIC, GRANITE, MARBLE )
1 Keramik Porselin uk. 20 x 20 Polos
2 Keramik Porselin uk. 20 x 20 Warna
3 Keramik Porselin uk. 20 x 20 Warna Anti Slip
4 Keramik Porselin uk. 20 x 25 Warna
5 Keramik Porselin uk. 30 x 30 Warna
6 Keramik Porselin uk. 30 x 30 Polos Anti Slip
7 Keramik Porselin uk. 30 x 30 Warna Anti Slip
8 Keramik Porselin uk. 40 x 40 Anti Gores ( KW 1 )
9 Keramik Porselin uk. 40 x 40 Anti Gores ( KW 2 )
10 Keramik Porselin uk. 60 x 60 Anti Gores ( KW 1 )
11 Keramik Porselin uk. 60 x 60 Unpolished
12 Lis Dinding Keramik WC uk. 8 x 20 cm
13 Lis Dinding Keramik WC uk. 10 x 40 cm
14 Porselin uk. 11 x 11 Putih
15 Porselin uk. 10 x 10 Warna
V. BAHAN LANGIT - LANGIT ( PLAFOND, ACOUSTIC )
1 Lis Profil Gypsum 8 cm
2 Lis Profil Gypsum 10 cm
3 Lis Profil Gypsum 12 cm
4 Lis Profil Gypsum 14 cm
5 Bunga Gypsum dia. 80 cm
6 Bunga Gypsum dia. 90 cm
7 Triplek tebal 3 mm
8 Triplek tebal 2 mm
9 GRC Board 3 mm
10 Gypsum Board tebal 9 mm
11 Pintu WC PVC
12 Pintu Double Alumunium
13 Pintu Panel kayu Kls. I
14 Pintu Panel Kayu Kls. II
15 Kusen Alumunium
VI. BAHAN ATAP ( ROOF )
1 Genteng Kodok / Glazuur Dengan Cat
2 Bubungan Genteng Kodok / Glazuur
3 Seng Gelombang BJLS 0,30
4 Seng Gelombang BJLS 0,20
5 Genteng Metal Warna Berpasir uk. 0.88 x 0.88 M2, tebal 0.35 mm
6 Genteng Metal Warna Polos uk. 0.88 x 0.88 M2, tebal 0.35 mm
7 Genteng Metal Warna Berpasir uk. 0.88 x 0.44 M2, tebal 0.35 mm
8 Genteng Metal Warna Polos uk. 0.88 x 0.44 M2, tebal 0.35 mm
9 Genteng Metal Multi Sirap Type Borneo uk. 7.00 x 0.50 M2, tebal 0.40 mm
10 Nok Genteng Metal Warna Berpasir uk. 1.00 x 0.91 M2, tebal 0.35 mm
11 Nok Genteng Metal Warna Polos uk. 1.00 x 0.91 M2, tebal 0.35 mm
12 Nok Genteng Metal Multi Sirap uk. 0.46 x 0.23 M2, tebal 0.40 mm
13 Seng Datar BJLS 0,30
14 Seng Datar BJLS 0,20
15 Atap Fibreglass Gelombang 3 mm
16 Pagar Besi Hollo
17 Pagar Besi Stainlish
18 Huruf Stainlish T = 8 mm
19 Huruf Stainlish T = 6 mm
No. Jenis Bahan / Material Bangunan

1 2
VII. BAHAN KACA ( GLASS )
1 Naco + Bingkai ( 80 x 15 cm ) 10 Daun Polos
2 Naco + Bingkai ( 80 x 15 cm ) 10 Daun Rayban
3 Kaca Polos 3 mm
4 Kaca Polos 5 mm
5 Kaca Warna 3 mm
6 Kaca Buram 3 mm
7 Kaca Buram Warna 3 mm
8 Kaca Rayban 3 mm
9 Kaca Rayban 5 mm
10 Kaca Cermin 3 mm
VIII. BAHAN CAT ( PAINT )
1 Amplas Kayu / Besi / Tembok
2 Dempul
3 Cat Dasar Tembok
4 Cat Dasar Kayu
5 Meni Besi
6 Cat Kilat
7 Plamur
8 Cat Khusus Tembok Luar
9 Pelitur
10 Melamic
11 Vernis
12 Minyak Cat / Thinner
13 Ter / Residu
IX. BAHAN BESI , ALUMINIUM & KAWAT ( IRON, ALUMUNIUM & WIRE )
1 Besi Simpai Kawat
2 Besi Tulangan Beton
3 Kawat Ikat Beton
4 Kawat Harmonika 1 Roll = 5.0 x 5.0 M2
5 Kawat Nyamuk / Besi
6 Kawat Nyamuk / Plastik (Kassa)
7 Kawat Ikat Beronjong / Galvanis
8 Wiremesh Besi Ulir diam. 4 mm 1 Gulung = 2.10 x 54.00 M2
9 Wiremesh Besi Ulir diam. 5 mm 1 Gulung = 2.10 x 54.00 M2
10 Wiremesh Besi Ulir diam. 6 mm 1 Gulung = 2.10 x 54.00 M2
11 Multi Truss ( Rangka Atap Baja Ringan ) bentang < 12.00 M
12 Besi Plat T = 1.00 mm L = 2 cm ( Besi Strip )
13 Beugel
14 Alumunium Foil uk. 60,00 x 1,25 M2
15 Alumunium Tape
X. BAHAN PENGGANTUNG, KUNCI & PEREKAT ( NAILS, KEYS & GLUE )
1 Paku Campuran 1" - 5 "
2 Paku Atap Seng / Paku Payung
3 Paku Genteng Metal Multi Sirap
4 Paku Gypsum
5 Paku Sekrup
6 Paku Beton
7 Paku Tripleks
8 Sekrup / Baut / Mur
9 Baut Besar
10 Kunci Pintu Tanam Antik
11 Kunci Pintu Tanam
12 Kunci Pintu Tanam KM / WC
13 Kunci Silinder
14 Kunci Lemari
No. Jenis Bahan / Material Bangunan

1 2
15 Selot Pintu
16 Selot Jendela
17 Engsel Pintu Biasa
18 Engsel Jendela Biasa
19 Engsel Pintu Kuningan
20 Engsel Jendela Kuningan
21 Kait Angin
22 Handle Pintu & Jendela
23 Lem Kayu / Tripleks
24 Lem PVC
25 Lem Genteng Metal Multi Sirap
26 Seal Tape
XI. BAHAN SANITAIR ( SANITARY )
1 Kloset Duduk / Monoblok
2 Kloset Jongkok Standar
3 Urinoir
4 Bidet
5 Wastafel Keramik
6 Bak Mandi Fibreglass
7 Badkip / Bathtub Porselin Panjang
8 Badkip / Bathtub Porselin Sudut
9 Bak Air Fibreglass vol. 1 m3
10 Bak Cuci Piring Stainless Steel Double
11 Water Drain + Acessories
12 Shower ( Tray )
13 Tempat Sabun / Soap Dish 1 lubang
14 Kran Air Lokal 3/4 "
15 Floor Drain
16 Pemanas Air / Water Heater + Lapisan Anti Karat kap. 15 liter
XII. BAHAN PIPA ( PIPES )
1 Pipa GIP class medium diameter 200 mm ( 8 " )
2 Pipa GIP class medium diameter 150 mm ( 6 " )
3 Pipa GIP class medium diameter 100 mm ( 4 " )
4 Pipa GIP class medium diameter 75 mm ( 3 " )
5 Pipa GIP class medium diameter 50 mm ( 2 " )
6 Pipa PVC S - 12,5 RRJ diameter 630mm ( 24 " )
7 Pipa PVC S - 12,5 RRJ diameter 500 mm ( 20 " )
8 Pipa PVC S - 12,5 RRJ diameter 450 mm ( 18 " )
9 Pipa PVC S - 12,5 RRJ diameter 400 mm ( 16 " )
10 Pipa PVC S - 12,5 RRJ diameter 355 mm ( 14 " )
11 Pipa PVC S - 12,5 RRJ diameter 300 mm ( 12 " )
12 Pipa PVC S - 12,5 RRJ diameter 275 mm ( 11 " )
13 Pipa PVC S - 12,5 RRJ diameter 250 mm ( 10 " )
14 Pipa PVC S - 12,5 RRJ diameter 225 mm ( 9 " )
15 Pipa PVC S - 12,5 RRJ diameter 200 mm ( 8 " )
16 Pipa PVC S - 12,5 RRJ diameter 150 mm ( 6 " )
17 Pipa PVC S - 12,5 RRJ diameter 125 mm ( 5 " )
18 Pipa PVC S - 12,5 RRJ diameter 100 mm ( 4 " )
19 Pipa PVC S - 12,5 RRJ diameter 75 mm ( 3 " )
20 Pipa PVC S - 12,5 RRJ diameter 65 mm ( 2,5 " )
21 Pipa PVC S - 12,5 RRJ diameter 50 mm ( 2 " )
22 Pipa PVC Tipe AW diameter 250 mm ( 10 " )
23 Pipa PVC Tipe AW diameter 200 mm ( 8 " )
24 Pipa PVC Tipe AW diameter 150 mm ( 6 " )
25 Pipa PVC Tipe AW diameter 125 mm ( 5 " )
26 Pipa PVC Tipe AW diameter 100 mm ( 4 " )
27 Pipa PVC Tipe AW diameter 75 mm ( 3 " )
28 Pipa PVC Tipe AW diameter 50 mm ( 2 " )
29 Pipa PVC Tipe AW diameter 40 mm ( 1,5 " )
30 Pipa PVC Tipe AW diameter 25 mm ( 1 " )
31 Pipa PVC Tipe AW diameter 18.75 mm ( 3/4 " )
32 Pipa PVC Tipe AW diameter 12.5 mm ( 1/2 " )
33 Pipa Flexibel diameter 150 mm ( 6 " )
34 Pipa Flexibel diameter 100 mm ( 4 " )
No. Jenis Bahan / Material Bangunan

1 2
XIII. ASESORI PIPA TRANSMISI & DISTRIBUSI ( PIPE'S ACESSORIES )
1 All Socket Tee PVC dia 200 x 200 mm
2 All Socket Tee PVC dia 200 x 160 mm
3 All Socket Tee PVC dia 200 x 110 mm
4 All Socket Tee PVC dia 200 x 90 mm
5 All Socket Tee PVC dia 150 x 150 mm
6 All Socket Tee PVC dia 150 x 100 mm
7 All Socket Tee PVC dia 160 x 90 mm
8 All Socket Tee PVC dia 150 x 75 mm
9 All Socket Tee PVC dia 110 x 90 mm
10 All Socket Tee PVC dia 100 x 50 mm
11 All Socket Tee PVC dia 75 x 75 mm
12 All Socket Tee PVC dia 75 x 50 mm
13 All Socket Tee PVC dia 50 x 50 mm
All Flanged Gate Valve dia 250 mm
14 All Flanged Gate Valve dia 200 mm
15 All Flanged Gate Valve dia 150 mm
16 All Flanged Gate Valve dia 100 mm
All Flanged Gate Valve dia 75 mm
All Flanged Gate Valve dia 50 mm
17 All Flanged Spigot PVC dia 300 mm
18 All Flanged Spigot PVC dia 250 mm
19 All Flanged Spigot PVC dia 200 mm
20 All Flanged Spigot PVC dia 160 mm
21 All Flanged Spigot PVC dia 110 mm
22 All Flanged Spigot PVC dia 90 mm
23 All Flanged Spigot PVC dia 63 mm
24 All Flange Bend GIP 45 x 150 mm
25 All Flange Bend GIP 90 x 150 mm
26 All Socket Bend PVC dia 315 mm 90°
27 All Socket Bend PVC dia 250 mm 90°
All Socket Bend PVC dia 250 mm 45°
All Socket Bend PVC dia 250 mm 22,5°
28 All Socket Bend PVC dia 200 mm 90°
All Socket Bend PVC dia 200 mm 45°
All Socket Bend PVC dia 200 mm 22,5°
29 All Socket Bend PVC dia 160 mm 90°
All Socket Bend PVC dia 160 mm 45°
All Socket Bend PVC dia 160 mm 22,5°
30 All Socket Bend PVC dia 140 mm 90°
All Socket Bend PVC dia 140 mm 45°
All Socket Bend PVC dia 140 mm 22,5°
31 All Socket Bend PVC dia 110 mm 90°
All Socket Bend PVC dia 110 mm 45°
32 All Socket Bend PVC dia 90 mm 90°
All Socket Bend PVC dia 90 mm 45°
33 All Socket Bend PVC dia 75 mm 90°
All Socket Bend PVC dia 75 mm 45°
34 All Socket Bend PVC dia 63 mm 90°
All Socket Bend PVC dia 63 mm 45°
Flage Socket PVC Diameter 100 mm
Flage Socket PVC Diameter 75 mm
Flage Socket PVC Diameter 50 mm
35 All Flange Reducer GIP diam. 250 x 200 mm
All Flange Reducer GIP diam. 250 x 150 mm
All Flange Reducer GIP diam. 200 x 150 mm
All Flange Reducer GIP diam. 200 x 100 mm
All Flange Reducer GIP diam. 150 x 100 mm
36 All Flange Reducer PVC dia 315 x 250 mm
37 All Flange Reducer PVC dia 250 x 200 mm
38 All Flange Reducer PVC dia 200 x 150 mm
All Flange Reducer PVC dia 200 x 100 mm
39 All Flange Reducer PVC dia 160 x 110 mm
40 All Flange Reducer PVC dia 110 x 90 mm
41 All Flange Reducer PVC dia 110 x 63 mm
42 All Flange Reducer PVC dia 90 x 63 mm
XIII. ASESORI PIPA TRANSMISI & DISTRIBUSI ( PIPE'S ACESSORIES )
Bend 90° GIP Diameter 250 mm
Bend 45° GIP Diameter 250 mm
Bend 22,5° GIP Diameter 250 mm
Bend 90° GIP Diameter 200 mm
Bend 45° GIP Diameter 200 mm
Bend 22,5° GIP Diameter 200 mm
Bend 90° GIP Diameter 150 mm
Bend 45° GIP Diameter 150 mm
Bend 22,5° GIP Diameter 150 mm
Bend 90° GIP Diameter 100 mm
Bend 45° GIP Diameter 100 mm
Bend 90° GIP Diameter 75 mm
Bend 45° GIP Diameter 75 mm
Bend 90° GIP Diameter 50 mm
Bend 45° GIP Diameter 50 mm
43 Flange GIP diam. 50 mm
44 Flange GIP diam. 75 mm
45 Flange GIP diam. 100 mm
46 Flange GIP diam. 150 mm
47 Flexibel Joint diam. 150 mm
XIV. BAHAN TANKI AIR UNTUK HIDRAN UMUM ( WATER TANKS )
1 Hidran Umum Polyethylene ( PE ) vol. 1,0 m3
2 Hidran Umum Polyethylene ( PE ) vol. 2,0 m3
3 Hidran Umum Polyethylene ( PE ) vol. 3,0 m3
4 Hidran Umum Fibreglass ( FRP ) vol. 1,0 m3
5 Hidran Umum Fibreglass ( FRP ) vol. 2,0 m3
6 Hidran Umum Fibreglass ( FRP ) vol. 3,0 m3
7 Water Meter
Jenis Bahan / Material Bangunan

1 2
XV. BAHAN ELEKTRIKAL ( ELECTRICAL, CABLES, LAMPS )
1 Sekring Biasa
2 Sekring Otomatic 16 A ( Jerman )
3 Stop Kontak
4 Saklar
5 Lampu Pijar 10 Watt
6 Lampu Pijar 25 Watt
7 Lampu Pijar 60 Watt
8 Lampu Neon (TL) 10 Watt
9 Lampu Neon (TL) 20 Watt
10 Lampu Kap Baret
11 Lampu Sorot Lengkap 120 Watt
12 Lampu SL 18 Watt
13 Lampu SL 20 Watt
14 Lampu SL 50 Watt

B. UPAH KERJA
FTAR HARGA UPAH KERJA BAHAN DAN

Upah Kerja
Satuan
(Rp.)
3 4
Org / Hari 70,950.00
Org / Hari 98,230.00
Org / Hari 91,630.00
Org / Hari 77,990.00
Org / Hari 77,990.00
Org / Hari 77,990.00
Org / Hari 77,990.00
Org / Hari 77,990.00
Org / Hari 77,990.00

Satuan Harga Bahan


(Rp.)
3 4

M3 2,478.00
M 3
1,126,290.00
M3 384,560.00
M3
M3
M3 35,239.00
M3 39,675.00
M3 5,133,902.00
M3 2,990,460.00
M3 24,478.00
M3 25,788.00
M3 5,133,902.00
M3 3,278,535.00
M3 147,290.00
M' 49,594.00
M' 103,070.00
M' 72,738.00
M' 75,652.00
M3 14,898.00
M3 88,277.00
M3 80,590.00
Kg 90,000,000.00
Unit 30,000,000.00
Unit 50,000,000.00
Unit 20,000,000.00
M3
Kg
Kg
Btg
M
Set
Kg
Set
M 61,980.00
Bh 80,000.00
Bh 200,000.00
M 846,326.00
Kg 23,295.00
Kg 33,933.00
Satuan Harga Bahan
Tanpa Jasa & Pajak
(Rp.)
3 4

50 Kg / Zak 75,000.00
Kg 7,500.00

M3 7,750,000.00
M3 9,690,000.00
M3 4,030,000.00
M3 5,130,000.00
M3 3,410,000.00
M3 7,750,000.00
M3 9,690,000.00
M3 4,485,000.00
M3 4,830,000.00
M3 4,140,000.00
M3 2,553,000.00
M3 3,300,000.00
M3 11,165,000.00

Kotak 40,000.00
Kotak 42,000.00
Kotak 45,000.00
Kotak 54,000.00
Kotak 51,200.00
Kotak 50,000.00
Kotak 60,000.00
Kotak 115,000.00
Kotak 100,000.00
Kotak 160,000.00
Kotak 146,000.00
Buah 3,800.00
Buah 15,000.00
M2 42,500.00
M2 45,000.00

M' 9,000.00
M' 10,500.00
M' 11,000.00
M' 11,000.00
Buah 300,000.00
Buah 375,000.00
Lembar 55,000.00
Lembar 42,000.00
Lembar 57,500.00
Lembar 67,500.00
Buah 250,000.00
Buah 800,000.00
Buah 800,000.00
Buah 650,000.00
M' 85,000.00

Buah 2,500.00
Buah 5,500.00
Lembar 65,500.00
Lembar 37,500.00
Buah/2 susun 70,000.00
Buah/2 susun 60,000.00
Buah/1 susun 36,000.00
Buah/1 susun 25,500.00
Buah 240,000.00
Buah 70,000.00
Buah 65,000.00
Buah 48,000.00
Lembar 66,500.00
Lembar 38,000.00
Lembar 67,500.00
M' 450,000.00
M' 650,000.00
Cm 8,500.00
Cm 7,000.00
Satuan Harga Bahan
Tanpa Jasa & Pajak
(Rp.)
3 4

Set 250,000.00
Set 260,000.00
M2 90,000.00
M2 120,000.00
M2 150,000.00
M2 175,000.00
M2 200,000.00
M2 110,000.00
M2 145,000.00
M2 225,000.00

Lembar 2,500.00
Kg 23,000.00
Kaleng/5kg 35,000.00
Kg 27,000.00
Kg 27,000.00
Kg 33,000.00
Kg 42,500.00
Kaleng/5ltr 90,000.00
Liter 45,000.00
Liter 55,000.00
Liter 37,500.00
Liter 15,000.00
Liter 42,300.00

Kg 16,000.00
Kg 9,900.00
Kg 20,000.00
Roll 350,000.00
M2 13,000.00
M2 18,000.00
Kg 25,000.00
Gulung 2,000,000.00
Gulung 2,400,000.00
Gulung 3,040,000.00
M2 288,000.00
Batang 9,618.00
Batang 22,500.00
M2 7,500.00
Roll 75,000.00

Kg 15,000.00
Kg 20,000.00
Kg 17,000.00
Kg 29,000.00
Buah 6,000.00
Kotak/100 Bh 20,000.00
Kg 26,000.00
Kg 2,500.00
Buah 6,500.00
Buah 200,000.00
Buah 175,000.00
Buah 36,300.00
Buah 36,500.00
Buah 12,500.00
Satuan Harga Bahan

Tanpa Jasa & Pajak


(Rp.)
3 4
Buah 13,500.00
Buah 5,000.00
Buah 7,000.00
Buah 6,000.00
Buah 12,500.00
Buah 10,000.00
Buah 7,500.00
Buah 5,000.00
Kg 37,500.00
Kg 46,500.00
Cup 20,000.00
Buah 5,000.00

Buah 1,375,000.00
Buah 150,000.00
Buah 950,000.00
Buah 0.00
Buah 475,000.00
Buah 1,500,000.00
Buah 2,750,000.00
Buah 7,200,000.00
Buah 1,400,000.00
Buah 366,250.00
Set 375,000.00
Buah 85,000.00
Buah 37,500.00
Buah 12,500.00
Buah 17,500.00
Buah 1,850,000.00

M' 233,500.00
M' 188,000.00
M' 151,000.00
M' 117,000.00
M' 55,000.00
M' 2,394,750.00
M' 1,506,700.00
M' 1,385,550.00
M' 933,000.00
M' 724,500.00
M' 575,000.00
M' 312,750.00
M' 402,500.00
M' 322,500.00
M' 279,600.00
M' 154,000.00
M' 118,000.00
M' 78,500.00
M' 49,200.00
M' 33,750.00
M' 24,100.00
M' 176,500.00
M' 119,500.00
M' 91,250.00
M' 76,000.00
M' 47,250.00
M' 28,350.00
M' 14,500.00
M' 11,250.00
M' 6,250.00
M' 4,500.00
M' 4,500.00
M' 166,700.00
M' 166,700.00
Satuan Harga Bahan

Tanpa Jasa & Pajak


(Rp.)
3 4

Buah 1,000,000.00
Buah 850,000.00
Buah 750,000.00
Buah 600,000.00
Buah 581,800.00
Buah 504,800.00
Buah 900,000.00
Buah 800,000.00
Buah 320,000.00
Buah 275,000.00
Buah 200,000.00
Buah 175,000.00
Buah 130,000.00
Buah 4,200,000.00
Buah 2,782,500.00
Buah 1,575,000.00
Buah 787,500.00
Buah 630,000.00
Buah 420,000.00
Buah 1,100,000.00
Buah 1,890,000.00
Buah 1,365,000.00
Buah 840,000.00
Buah 400,000.00
Buah 287,500.00
Buah 172,500.00
Buah 660,000.00
Buah 800,000.00
Buah 1,379,300.00
Buah 1,365,000.00
Buah 1,050,000.00
Buah 945,000.00
Buah 735,000.00
Buah 630,000.00
Buah 525,000.00
Buah 420,000.00
Buah 0.00
Buah 0.00
Buah 0.00
Buah 0.00
Buah 0.00
Buah 185,000.00
Buah 105,000.00
Buah 55,400.00
Buah 0.00
Buah 37,850.00
Buah 0.00
Buah 31,500.00
Buah 26,500.00
Buah 472,500.00
Buah 367,500.00
Buah 236,500.00
Buah 0.00
Buah 420,000.00
Buah 0.00
Buah 0.00
Buah 275,000.00
Buah 580,200.00
Buah 420,000.00
Buah 262,500.00
Buah 302,000.00
Buah 126,000.00
Buah 80,000.00
Buah 70,000.00
Buah 46,050.00
Buah 577,500.00
Buah 0.00
Buah 0.00
Buah 294,000.00
Buah 0.00
Buah 0.00
Buah 0.00
Buah 0.00
Buah 0.00
Buah 50,000.00
Buah 0.00
Buah 0.00
Buah 0.00
Buah 0.00
Buah 0.00
Buah 30,000.00
Buah 33,000.00
Buah 40,000.00
Buah 75,000.00
Buah 1,280,000.00

Unit 2,925,000.00
Unit 5,680,000.00
Unit 7,530,000.00
Unit 1,700,000.00
Unit 2,800,000.00
Unit 3,800,000.00
Unit 365,000.00
Harga Bahan
Satuan
(Rp.)
3 4

Buah 25,000.00
Buah 18,000.00
Buah 15,000.00
Buah 15,600.00
Buah 4,800.00
Buah 6,000.00
Buah 6,000.00
Set 10,100.00
Set 12,000.00
Set 132,000.00
Set 156,000.00
Buah 30,000.00
Buah 35,000.00
Buah 95,000.00
ANALISA HARGA SATUAN

Galian Tanah Cadas / Padas yang banyak Batu / Kerikil sedalam 1 meter ( PT.03 / m 3 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 88,687.50
2 Mandor OH 122,787.50
Jumlah
B BAHAN

Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga / M3

Pekerjaan Beton Bertulang, camp. 1 PC : 2 Ps : 3 Kr ( PBe.03 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Semen OH 631,000.00
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Semen Portland Kg 1,875.00
2 Pasir Beton/Pasang M3 90,625.00
3 Batu 0,5 - 1 (Kerikil Beton) M 3
687,500.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan
Pasangan Batu Kali uk. 10 - 15 cm, camp. 1 PC : 2 Ps ( PPBC.07 / m 3 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 25,000.00
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Semen Portland Kg 1,875.00
2 Pasir Beton/Pasang M 3
90,625.00
3 Batu Belah 10 - 15 cm M3 285,713.75
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

Plesteran t = 1,5 cm, camp. 1 PC : 2 Ps ( PPs.04 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Semen OH 12,620.00
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Semen Portland Kg 1,875.00
2 Pasir Beton/Pasang M3 90,625.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

Urugan Kembali Tanah Galian ( PT.05 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 88,687.50
2 Mandor OH 122,787.50
Jumlah
B BAHAN

Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

Pekerjaan Rangka Badan Kayu Kelas I ( PK.08 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Kelas I (Ketam) M3 6,412,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

Pasangan Batako tebal 1/2 bata, camp. 1 PC : 2 Ps ( PPBC.04 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 1,706,250.00
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Batako Bh 1,500.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

1 buah pasang kunci tanam biasa


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 590,625.00
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kunci Tanam Biasa Bh 1,500.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

1 Pasang Gerendel Pintu


HARGA
No. URAIAN PEKERJAAN SATUAN
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 0.00
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Gerendel Pintu Bh 1,500.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

1 Pasang Engsel Pintu


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 50,000.00
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Ensel Pintu Bh 1,500.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

Pemasangan Kusen Pintu dan Jendela Kayu Kelas I ( PK.14 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Kelas I (Ketam) M3 6,412,500.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

Pekerjaan Konstruksi Rangka Kuda-kuda ( PK.15 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Kelas II M3 4,262,500.00
2 Besi Strip Btg 12,022.50
3 Baut Bh 8,125.00
4 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

Pemasangan Rangka Atap Seng ( PK.16 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Kelas II M3 4,262,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

Pemasangan Lisplang uk. 2 x (2 x 20) cm, Kayu Kelas I ( PK.20 / m' )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 6,037,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

Pemasangan Atap Seng Gelombang BJLS 0,20 ( PPA.05 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Seng Gelombang BJLS 0,20 Lbr 81,875.00
2 Paku Payung Kg 25,000.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

Pemasangan Bubungan / Nok Atap Seng Gelombang ( PPA.06 / m' )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Papan Kayu Klas II M3 5,175,000.00
2 Seng Datar BJLS 0,20 Lbr 47,500.00
3 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

Pengecatan Tembok Baru (1 Lapis Plamur), 1 Lapis Cat Dasar,


1 Lapis Cat Penutup ( PC.05 / m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Cat OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Plamur Kg 53,125.00
2 Cat Dasar Tembok Kg 43,750.00
3 Cat Tembok Ltr 112,500.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

Pekerjaan Pembesian dengan Besi Polos atau Besi Ulir ( PBe.04 / kg )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Besi OH 77,990.00
2 Pekerja OH 70,950.00
3 Kepala Tukang OH 91,630.00
4 Mandor OH 98,230.00
Jumlah
B BAHAN
1 Besi Beton (Polos/Ulir) Kg 23,295.00
2 Kawat Ikat Beton Kg 33,933.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan

Pemasangan Bekisting / Cetakan Beton ( PBe.06 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Papan Kayu Bekisting M3 3,191,250.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B

D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.28

Galian Tanah Biasa sedalam 1 meter ( PT.01 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 70,950.00
2 Mandor OH 98,230.00
Jumlah
B BAHAN

Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga Satuan
UAN

eter ( PT.03 / m 3 )
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

1.500 133,031.25
0.125 15,348.44
148,379.69

0.00
148,379.69
14,837.97
163,217.66

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.250 157,750.00
1.650 146,334.38
0.025 2,863.44
0.080 9,823.00
316,770.81

323.000 605,625.00
0.520 47,125.00
0.780 536,250.00
1,189,000.00
1,505,770.81
150,577.08
1,505,770.81
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

1.200 30,000.00 Pekerja Hari/Orang


3.600 319,275.00 Tukang Batu Hari/Orang
0.120 13,744.50 Kepala Tukang Hari/Orang
0.180 22,101.75 Mandor Hari/Orang
385,121.25 JUMLAH

264.500 495,937.50 BAHAN


0.4275 38,742.19 Batu belah 10/15 cm M3
1.000 285,713.75 Semen Portland Kg
820,393.44 Pasir pasang M3
1,205,514.69
120,551.47
1,326,066.16

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.150 1,893.00
0.200 17,737.50
0.015 1,718.06
0.010 1,227.88
22,576.44

8.520 15,975.00
0.017 1,540.63
17,515.63
40,092.06
4,009.21
44,101.27

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.192 17,028.00
0.0192 2,357.52
19,385.52

0.00
19,385.52
1,938.55
21,324.07

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

24.000 2,339,700.00
8.000 709,500.00
2.400 274,890.00
0.400 49,115.00
3,373,205.00

1.100 7,053,750.00
0.050 937.50
7,054,687.50
10,427,892.50
1,042,789.25
11,470,681.75
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.150 255,937.50
0.450 39,909.38
0.015 1,718.06
0.0225 2,762.72
300,327.66

22.000 33,000.00
20.600 38,625.00
0.0333 3,017.81
74,642.81
374,970.47
37,497.05
412,467.52

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.500 295,312.50
0.010 886.88
0.010 1,145.38
0.005 613.94
297,958.69

22.000 33,000.00
33,000.00
330,958.69
33,095.87
364,054.56

BIAYA
KUANTITAS
KUANTITAS SATUAN
( Rp. )
5 6

0.500 0.00
0.010 886.88
0.010 1,145.38
0.005 613.94
2,646.19

22.000 33,000.00
33,000.00
35,646.19
3,564.62
39,210.81

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.150 7,500.00 Pekerja Hari/Orang


0.015 1,330.31 Tukang Kayu Hari/Orang
0.015 1,718.06 Kepala Tukang Hari/Orang
0.00075 92.09 Mandor Hari/Orang
10,640.47

22.000 33,000.00
33,000.00
43,640.47
4,364.05
48,004.51

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
18.000 1,754,775.00
6.000 532,125.00
2.000 229,075.00
0.300 36,836.25
2,552,811.25

1.100 7,053,750.00
7,053,750.00
9,606,561.25
960,656.13
10,567,217.38

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

12.000 1,169,850.00
4.000 354,750.00
1.200 137,445.00
0.200 24,557.50
1,686,602.50

1.100 4,688,750.00
15.000 180,337.50
40.000 325,000.00
0.400 7,500.00
5,201,587.50
6,888,190.00
688,819.00
7,577,009.00

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.100 9,748.75
0.150 13,303.13
0.010 1,145.38
0.0075 920.91
25,118.16

0.0111 47,361.11
0.100 1,875.00
49,236.11
74,354.27
7,435.43
81,789.69

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.100 9,748.75
0.100 8,868.75
0.010 1,145.38
0.050 6,139.38
25,902.25

0.010 60,375.00
0.025 468.75
60,843.75
86,746.00
8,674.60
95,420.60

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.060 5,849.25
0.120 10,642.50
0.006 687.23
0.006 736.73
17,915.70

0.700 57,312.50
0.020 500.00
57,812.50
75,728.20
7,572.82
83,301.02

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.070 6,824.13
0.150 13,303.13
0.008 916.30
0.006 736.73
21,780.28

0.010 51,750.00
0.300 14,250.00
0.040 750.00
66,750.00
88,530.28
8,853.03
97,383.30

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.063 6,141.71
0.020 1,773.75
0.0063 721.59
0.0025 306.97
8,944.02

0.100 5,312.50
0.100 4,375.00
0.130 14,625.00
24,312.50
33,256.52
3,325.65
36,582.17

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.007 545.93
0.007 496.65
0.0007 64.14
0.0003 29.47
1,136.19

1.050 24,459.75
0.015 509.00
24,968.75
26,104.94
2,610.49
28,715.43

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.260 25,346.75
0.300 26,606.25
0.026 2,977.98
0.005 613.94
55,544.91

0.040 127,650.00
0.300 5,625.00
133,275.00
188,819.91

188,819.91

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.0075 532.13
0.0008 73.67
605.80

0.00
605.80
60.58
666.38
1.500
0.600
0.060
0.075

1.100
267.000
0.427
0.015
0.150
0.015
0.00075
DAFTAR ANALISA HARGA SATUAN

Galian Tanah Biasa sedalam 1 meter ( PT.01 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 88,687.50
2 Mandor OH 122,787.50
Jumlah
B BAHAN

Jumlah
C Jumlah A + B
D Harga Satuan
E Galian sedalam > 1 meter 40,386.50
Acuan : SNI.2835.b - 6.1 & SNI.2835.b - 6.2

Galian Tanah Keras / Liat sedalam 1 meter ( PT.02 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 88,687.50
2 Mandor OH 122,787.50
Jumlah
B BAHAN

Jumlah
C Jumlah A + B
D Harga Satuan
E Galian sedalam > 1 meter 63,103.91
Acuan : SNI.2835.b - 6.4 & PT.01

Galian Tanah Cadas / Padas yang banyak Batu / Kerikil sedalam 1 meter ( PT.03 / m 3 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 88,687.50
2 Mandor OH 122,787.50
Jumlah
B BAHAN

Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan 10%
E Harga / M3
Acuan : SNI.2835.b - 6.5 & PT.01
Galian Tanah Lumpur sedalam 1 meter ( PT.04 / m 3 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 88,687.50
2 Mandor OH 122,787.50
Jumlah
B BAHAN

Jumlah
C Jumlah A + B
D Harga Satuan
E Galian sedalam > 1 meter 83,095.22
Acuan : SNI.2835.b - 6.6 & PT.01

Urugan Kembali Tanah Galian ( PT.05 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 88,687.50
2 Mandor OH 122,787.50
Jumlah
B BAHAN

Jumlah
0 Jumlah A + B
D Harga Satuan
Acuan : SNI.2835.b - 6.9

Menimbun dengan Tanah Datang secara Manual ( PT.06 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 88,687.50
2 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Tanah Urug/Tanah Datang M3 27,000.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = SNI.2835.b - 6.9 Bahan = SNI.2835.b - 6.11
Pemadatan Tanah secara Manual ( PT.07 / m 3 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 88,687.50
2 Mandor OH 122,787.50
Jumlah
B BAHAN

Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2835.b - 6.10

Urugan Pasir di Bawah Lantai Bangunan/Alas Jalan, Terhitung Penyiramannya ( PT.08 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 88,687.50
2 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Pasir Urug M3 90,625.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2835.b - 6.11

Urugan Sirtu/Pasir Batu ( PT.09 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 88,687.50
2 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Sirtu/Pasir Batu M3 105,208.34
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2835.b - 6.15
Pasangan Bata Merah tebal 1/2 bata, camp. 1 PC : 2 Ps ( PPBC.01 / m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Bata Merah Bh 1,625.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2837.a - 6.9

Pasangan Bata Merah tebal 1/2 bata, camp. 1 PC : 3 Ps ( PPBC.02 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Bata Merah Bh 1,625.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2837.a - 6.10

Pasangan Bata Merah tebal 1/2 bata, camp. 1 PC : 4 Ps ( PPBC.03 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Bata Merah Bh 1,625.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2837.a - 6.11
Pasangan Batako tebal 1/2 bata, camp. 1 PC : 2 Ps ( PPBC.04 / m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Batako Bh 1,500.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = G.27 Bahan = G.33.l

Pasangan Batako tebal 1/2 bata, camp. 1 PC : 3 Ps ( PPBC.05 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Batako Bh 1,500.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = G.27 Bahan = G.33.i

Pasangan Batako tebal 1/2 bata, camp. 1 PC : 4 Ps ( PPBC.06 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Batako Bh 1,500.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = G.27 Bahan = G.33.h
Pasangan Batu Kali uk. 10 - 15 cm, camp. 1 PC : 2 Ps ( PPBC.07 / m 3 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Semen Portland Kg 1,875.00
2 Pasir Beton/Pasang M3 90,625.00
3 Batu Belah 10 - 15 cm M3 285,713.75
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = G.26 Bahan = G.32.k

Pasangan Batu Kali uk. 10 - 15 cm, camp. 1 PC : 3 Ps ( PPBC.08 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Semen Portland Kg 1,875.00
2 Pasir Beton/Pasang M3 90,625.00
3 Batu Belah 10 - 15 cm M3 285,713.75
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = G.26 Bahan = G.32.l

Pasangan Batu Kali uk. 10 - 15 cm, camp. 1 PC : 4 Ps ( PPBC.09 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Semen Portland Kg 1,875.00
2 Pasir Beton/Pasang M3 90,625.00
3 Batu Belah 10 - 15 cm M3 285,713.75
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = G.26 Bahan = G.32.h
Pasangan Rooster/Terawang ( PPBC.10/ m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Terawang/Rooster Batako Bh 2,000.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2837.a - 6.25

Pemasangan Paving Block, Pasir t = 10 cm ( PPBC.11 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 97,487.50
2 Pekerja OH 88,687.50
Jumlah
B BAHAN
1 Paving Block Bh 2,062.50
2 Pasir Urug M3 90,625.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : G.60

Pemasangan Dinding Batu Alam ( PPBC.12 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Batu Alam Marmo uk. 10 x 20 cm abu-abu M2 4,750.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.74
Bronjong dengan Kawat Galvanis ( PPBC.13 / m 3 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Anyam Bronjong OH 97,487.50
2 Pekerja OH 88,687.50
3 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kawat Galvanis Kg #NAME?
2 Batu Belah 10 - 15 cm M3 285,713.75
Jumlah
C Jumlah A + B
D (Jumlah A + B) x 1/3
E Harga Satuan
Acuan : G.5.a
DAFTAR ANALISA HARGA SATUAN

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.400 35,475.00
0.040 4,911.50
40,386.50

0.00
40,386.50
40,386.50
1.315 53,108.25

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.625 55,429.69
0.0625 7,674.22
63,103.91

0.00
63,103.91
63,103.91
1.315 82,981.64

g banyak Batu / Kerikil sedalam 1 meter ( PT.03 / m 3 )


BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

1.500 133,031.25
0.125 15,348.44
148,379.69

0.00
148,379.69
14,837.97
163,217.66
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.823 72,989.81
0.0823 10,105.41
83,095.22

0.00
83,095.22
83,095.22
1.315 109,270.22

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.192 17,028.00
0.0192 2,357.52
19,385.52

0.00
19,385.52
19,385.52

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.192 17,028.00
0.0192 2,357.52
19,385.52

1.200 32,400.00
32,400.00
51,785.52
51,785.52
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.500 44,343.75
0.050 6,139.38
50,483.13

0.00
50,483.13
50,483.13

angunan/Alas Jalan, Terhitung Penyiramannya ( PT.08 / m 3 )


BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.300 26,606.25
0.010 1,227.88
27,834.13

1.200 108,750.00
108,750.00
136,584.13
136,584.13

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.250 22,171.88
0.025 3,069.69
25,241.56

1.200 126,250.01
126,250.01
151,491.57
151,491.57
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.100 9,748.75
0.320 28,380.00
0.010 1,145.38
0.015 1,841.81
41,115.94

70.000 113,750.00
18.950 35,531.25
0.038 3,443.75
152,725.00
193,840.94
193,840.94

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.100 9,748.75
0.320 28,380.00
0.010 1,145.38
0.015 1,841.81
41,115.94

70.000 113,750.00
14.370 26,943.75
0.040 3,625.00
144,318.75
185,434.69
185,434.69

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.100 9,748.75
0.320 28,380.00
0.010 1,145.38
0.015 1,841.81
41,115.94

70.000 113,750.00
11.500 21,562.50
0.043 3,896.88
139,209.38
180,325.31
180,325.31
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.150 14,623.13
0.450 39,909.38
0.015 1,718.06
0.0225 2,762.72
59,013.28

22.000 33,000.00
20.600 38,625.00
0.0333 3,017.81
74,642.81
133,656.09
133,656.09

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.150 14,623.13
0.450 39,909.38
0.015 1,718.06
0.0225 2,762.72
59,013.28

22.000 33,000.00
15.750 29,531.25
0.0378 3,425.63
65,956.88
124,970.16
124,970.16

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.150 14,623.13
0.450 39,909.38
0.015 1,718.06
0.0225 2,762.72
59,013.28

22.000 33,000.00
12.650 23,718.75
0.0406 3,679.38
60,398.13
119,411.41
119,411.41
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

1.200 116,985.00
3.600 319,275.00
0.120 13,744.50
0.180 22,101.75
472,106.25

264.500 495,937.50
0.4275 38,742.19
1.000 285,713.75
820,393.44
1,292,499.69
1,292,499.69

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

1.200 116,985.00
3.600 319,275.00
0.120 13,744.50
0.180 22,101.75
472,106.25

200.000 375,000.00
0.456 41,325.00
1.000 285,713.75
702,038.75
1,174,145.00
1,174,145.00

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

1.200 116,985.00
3.600 319,275.00
0.120 13,744.50
0.180 22,101.75
472,106.25

163.000 305,625.00
0.522 47,306.25
1.000 285,713.75
638,645.00
1,110,751.25
1,110,751.25
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.100 9,748.75
0.300 26,606.25
0.010 1,145.38
0.015 1,841.81
39,342.19

25.000 50,000.00
12.800 24,000.00
0.035 3,171.88
77,171.88
116,514.06
116,514.06

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.100 9,748.75
0.400 35,475.00
45,223.75

36.000 74,250.00
0.120 10,875.00
85,125.00
130,348.75
130,348.75

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.350 34,120.63
0.620 54,986.25
0.035 4,008.81
0.030 3,683.63
96,799.31

1.050 4,987.50
11.750 22,031.25
0.035 3,171.88
30,190.63
126,989.94
126,989.94
Perumahan utk Pek. Penutup Lantai & Dinding - 6.74
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

2.000 194,975.00
6.100 540,993.75
0.155 19,032.06
755,000.81

25.000 #NAME?
3.000 857,141.25
#NAME?
#NAME?
0.333 #NAME?
#NAME?
Dinding Plesteran Simpai t = 3 cm, Simpai Kawat, camp. 1 PC : 3 Ps ( PPs.01 / m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Semen OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Semen Portland Kg 1,875.00
2 Pasir Beton/Pasang M3 90,625.00
3 Besi Simpai Kawat Kg 20,000.00
4 Papan Mal Kayu Kls. III M3 3,191,250.00
5 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2837.b - 6.24

Plesteran t = 1 cm, camp. 1 PC : 2 Ps ( PPs.02 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Semen OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Semen Portland Kg 1,875.00
2 Pasir Beton/Pasang M3 90,625.00
Jumlah
C Jumlah A + B

D Harga Satuan
Acuan : Tenaga = SNI.2837.b - 6.1 Bahan = G.50.h

Plesteran t = 1 cm, camp. 1 PC : 3 Ps ( PPs.03 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Semen OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Semen Portland Kg 1,875.00
2 Pasir Beton/Pasang M3 90,625.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = SNI.2837.b - 6.1 Bahan = G.50.j
Plesteran t = 1,5 cm, camp. 1 PC : 2 Ps ( PPs.04 / m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Semen OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Semen Portland Kg 1,875.00
2 Pasir Beton/Pasang M3 90,625.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2837.b - 6.2

Plesteran t = 1,5 cm, camp. 1 PC : 3 Ps ( PPs.05 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Semen OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Semen Portland Kg 1,875.00
2 Pasir Beton/Pasang M3 90,625.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2837.b - 6.3

Pekerjaan Beton Tumbuk, camp. 1 PC : 3 Ps : 5 Kerikil ( PBe.01 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Semen OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Semen Portland Kg 1,875.00
2 Pasir Beton/Pasang M3 90,625.00
3 Kerikil M3 187,500.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.1
Pekerjaan Beton Tumbuk, camp. 1 PC : 3 Ps : 5 Batu Pecah ( PBe.02 / m 3 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Semen OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Semen Portland Kg 1,875.00
2 Pasir Beton/Pasang M3 90,625.00
3 Batu Belah 0,5 - 1 (Kerikil Beton) M3 687,500.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.1

Pekerjaan Beton Bertulang, camp. 1 PC : 2 Ps : 3 Kr ( PBe.03 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Semen OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Semen Portland Kg 1,875.00
2 Pasir Beton/Pasang M3 90,625.00
3 Batu Belah 0,5 - 1 (Kerikil Beton) M3 687,500.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.5

Pekerjaan Pembesian dengan Besi Polos atau Besi Ulir ( PBe.04 / kg )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
No. URAIAN PEKERJAAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Besi OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Besi Beton (Polos/Ulir) Kg 12,375.00
2 Kawat Ikat Beton Kg 25,000.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.25
Pekerjaan Pembesian dengan Wiremesh Besi Ulir ( PBe.05 / m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Besi OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Wiremesh Besi Ulir diam. 5 mm M2 33,509.70
2 Kawat Ikat Beton Kg 25,000.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.25

Pemasangan Bekisting / Cetakan Beton ( PBe.06 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Papan Kayu Bekisting M3 3,191,250.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.28
at, camp. 1 PC : 3 Ps ( PPs.01 / m 2 )
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.250 24,371.88
0.320 28,380.00
0.025 2,863.44
0.015 1,841.81
57,457.13

14.150 26,531.25
0.039 3,534.38
0.250 5,000.00
0.020 63,825.00
0.150 2,812.50
101,703.13
159,160.25
159,160.25

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.150 14,623.13
0.200 17,737.50
0.015 1,718.06
0.010 1,227.88
35,306.56

8.520 15,975.00
0.017 1,540.63
17,515.63
52,822.19

52,822.19

BIAYA
KUANTITAS
KUANTITAS SATUAN
( Rp. )
5 6

0.150 14,623.13
0.200 17,737.50
0.015 1,718.06
0.010 1,227.88
35,306.56

5.400 10,125.00
0.013 1,178.13
11,303.13
46,609.69
46,609.69
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.150 14,623.13
0.200 17,737.50
0.015 1,718.06
0.010 1,227.88
35,306.56

8.520 15,975.00
0.017 1,540.63
17,515.63
52,822.19
52,822.19

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.150 14,623.13
0.200 17,737.50
0.015 1,718.06
0.010 1,227.88
35,306.56

6.480 12,150.00
0.019 1,721.88
13,871.88
49,178.44
49,178.44

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.250 24,371.88
1.650 146,334.38
0.025 2,863.44
0.080 9,823.00
183,392.69

218.000 408,750.00
0.520 47,125.00
0.870 163,125.00
619,000.00
802,392.69
802,392.69
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.250 24,371.88
1.650 146,334.38
0.025 2,863.44
0.080 9,823.00
183,392.69

218.000 408,750.00
0.520 47,125.00
0.870 598,125.00
1,054,000.00
1,237,392.69
1,237,392.69

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.250 24,371.88
1.650 146,334.38
0.025 2,863.44
0.080 9,823.00
183,392.69

323.000 605,625.00
0.520 47,125.00
0.780 536,250.00
1,189,000.00
1,372,392.69
1,372,392.69

BIAYA
KUANTITAS SATUAN
KUANTITAS
( Rp. )
5 6

0.007 682.41
0.007 620.81
0.0007 80.18
0.0003 36.84
1,420.24

1.050 12,993.75
0.015 375.00
13,368.75
14,788.99
14,788.99
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.007 682.41
0.007 620.81
0.0007 80.18
0.0003 36.84
1,420.24

1.050 35,185.19
0.015 375.00
35,185.19
36,605.42
36,605.42

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.260 25,346.75
0.300 26,606.25
0.026 2,977.98
0.005 613.94
55,544.91

0.040 127,650.00
0.300 5,625.00
133,275.00
188,819.91
188,819.91
Pemasangan Pondasi Tiang Tongkat Kayu Belian ( PK.01 / m 3 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Belian (Tidak Ketam) M3 9,687,500.00
2 Baut Bh 8,125.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.1.b

Pemasangan Rangka Keep Kayu Belian ( PK.02 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Belian (Tidak Ketam) M3 9,687,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.3

Pekerjaan Gelegar/Balok Lantai Kayu Belian ( PK.03 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Belian (Tidak Ketam) M3 9,687,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.1
Pekerjaan Gelegar/Balok Lantai Kayu Kelas I ( PK.04 / m 3 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Kelas I M3 5,037,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.1.a

Pemasangan Lantai Papan Kayu Belian ( PK.05 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Papan Kayu Belian (Ketam), t = 2 cm M3 12,112,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.37

Pemasangan Lantai Papan Kayu Kelas I ( PK.06 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Papan Kayu Kelas I (Ketam), t = 2 cm M3 6,037,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.37.a
Pekerjaan Rangka Badan Kayu Belian ( PK.07 / m 3 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Belian (Ketam) M3 12,112,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.27

Pekerjaan Rangka Badan Kayu Kelas I ( PK.08 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Kelas I (Ketam) M3 6,412,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.27.a

Pekerjaan Dinding Papan Kayu Belian ( PK.09 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Papan Kayu Belian (Ketam), t = 2 cm M3 6,037,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.55
Pekerjaan Dinding Papan Kayu Kelas I ( PK.10 / m 3 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Papan Kayu Kelas I (Ketam), t = 2 cm M3 6,037,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.54

Pemasangan Dinding Tripleks Satu Sisi, tebal 3 mm ( PK.11 / m 2 )


Untuk bahan dinding lainnya, dapat dipakai plywood tebal 4 mm atau teakwood tebal 4 mm
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Tripleks tebal 3 mm Lbr 11,250.00
2 Paku Tripleks Kg 32,500.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.59

Pemasangan Dinding Tripleks Rangkap, tebal 3 mm ( PK.12 / m 2 )


Untuk bahan dinding lainnya, dapat dipakai plywood tebal 4 mm atau teakwood tebal 4 mm
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Tripleks tebal 3 mm Lbr 11,250.00
2 Paku Tripleks Kg 32,500.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.59
Pemasangan Kusen Pintu dan Jendela Kayu Belian ( PK.13 / m 3 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Belian (Ketam) M3 12,112,500.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.3

Pemasangan Kusen Pintu dan Jendela Kayu Kelas I ( PK.14 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Kelas I (Ketam) M3 6,412,500.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.2

Pekerjaan Konstruksi Rangka Kuda-kuda ( PK.15 / m 3 )


Untuk memasang kembali kuda-kuda bongkaran, harga satuan pekerjaan diambil 1/3 dari an
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Kelas II M3 4,262,500.00
2 Besi Strip Btg 12,022.50
3 Baut Bh 8,125.00
4 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.27
Pemasangan Rangka Atap Seng ( PK.16 / m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Kelas II M3 4,262,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = F.18 Bahan : F.19

Pemasangan Gording, Nok, Ikatan Angin ( PK.17 / m 3 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Kelas II M3 4,262,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.22.a

Pemasangan Kasau + Reng Atap Genteng/Metal ( PK.18 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Kelas II M3 4,262,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.31
Pemasangan Lisplang uk. (2 x 30) cm, Kayu Kelas I ( PK.19 / m' )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 6,037,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = SNI.3434 - 6.52 Bahan : SNI.3434 - 6.50

Pemasangan Lisplang uk. 2 x (2 x 20) cm, Kayu Kelas I ( PK.20 / m' )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 6,037,500.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.52

Pemasangan Atap Genteng Kodok / Glazuur ( PPA.01 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Genteng Kodok/Glazuur Bh 3,125.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3436 - 6.2
Pemasangan Bubungan / Nok Atap Genteng Kodok / Glazuur ( PPA.02 / m' )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Bubungan Genteng Kodok/Glazuur Bh 6,875.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3436 - 6.5

Pemasangan Atap Genteng Metal ( PPA.03 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Genteng Metal Bh 75,000.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3436 - 6.32

Pemasangan Atap Genteng Metal Multi Sirap ( PPA.04 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Genteng Multi Sirap Type Borneo Buah 300,000.00
2 Paku Genteng Multi Sirap Kg 21,250.00
3 Lem Genteng Multi Sirap Cup 25,000.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3436 - 6.32
Pemasangan Atap Seng Gelombang BJLS 0,20 ( PPA.05 / m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Seng Gelombang BJLS 0,20 Lbr 81,875.00
2 Paku Payung Kg 25,000.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3436 - 6.38

Pemasangan Bubungan / Nok Atap Seng Gelombang ( PPA.06 / m' )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Papan Kayu Klas II M3 5,175,000.00
2 Seng Datar BJLS 0,20 Lbr 47,500.00
3 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3436 - 6.39

Pemasangan Bubungan / Nok Atap Genteng Metal ( PPA.07 / m' )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Bubungan/Nok Genteng Metal M' 81,250.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3436 - 6.36
Pemasangan Bubungan / Nok Atap Genteng Metal Multi Sirap ( PPA.08 / m' )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Nok Genteng Multi Sirap Bh 60,000.00
2 Paku Genteng Multi Sirap Kg 21,250.00
3 Lem Genteng Multi Sirap Cup 25,000.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3436 - 6.36.a
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

5.000 487,437.50
5.000 443,437.50
0.500 57,268.75
0.250 30,696.88
1,018,840.63

1.100 10,656,250.00
40.000 325,000.00
10,981,250.00
12,000,090.63
12,000,090.63

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

8.000 779,900.00
8.000 709,500.00
0.800 91,630.00
0.400 49,115.00
1,630,145.00

1.100 10,656,250.00
3.000 56,250.00
10,712,500.00
12,342,645.00
12,342,645.00

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

5.000 487,437.50
5.000 443,437.50
0.500 57,268.75
0.250 30,696.88
1,018,840.63

1.100 10,656,250.00
3.000 56,250.00
10,712,500.00
11,731,340.63
11,731,340.63
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

5.000 487,437.50
5.000 443,437.50
0.500 57,268.75
0.250 30,696.88
1,018,840.63

1.100 5,541,250.00
3.000 56,250.00
5,597,500.00
6,616,340.63
6,616,340.63

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.800 77,990.00
0.280 24,832.50
0.080 9,163.00
0.014 1,719.03
113,704.53

0.020 242,250.00
0.100 1,875.00
244,125.00
357,829.53
357,829.53

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.800 77,990.00
0.280 24,832.50
0.080 9,163.00
0.014 1,719.03
113,704.53

0.020 120,750.00
0.100 1,875.00
122,625.00
236,329.53
236,329.53
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

24.000 2,339,700.00
8.000 709,500.00
2.400 274,890.00
0.400 49,115.00
3,373,205.00

1.100 13,323,750.00
0.050 937.50
13,324,687.50
16,697,892.50
16,697,892.50

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

24.000 2,339,700.00
8.000 709,500.00
2.400 274,890.00
0.400 49,115.00
3,373,205.00

1.100 7,053,750.00
0.050 937.50
7,054,687.50
10,427,892.50
10,427,892.50

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.450 43,869.38
0.150 13,303.13
0.045 5,154.19
0.075 9,209.06
71,535.75

0.022 132,825.00
0.100 1,875.00
134,700.00
206,235.75
206,235.75
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.450 43,869.38
0.150 13,303.13
0.045 5,154.19
0.075 9,209.06
71,535.75

0.022 132,825.00
0.100 1,875.00
134,700.00
206,235.75
206,235.75

ipakai plywood tebal 4 mm atau teakwood tebal 4 mm


BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.075 7,311.56
0.025 2,217.19
0.0075 859.03
0.0013 159.62
10,547.41

0.347 3,906.23
0.050 1,625.00
5,531.23
16,078.63
16,078.63

ipakai plywood tebal 4 mm atau teakwood tebal 4 mm


BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.075 7,311.56
0.025 2,217.19
0.0075 859.03
0.0013 159.62
10,547.41

0.694 7,812.45
0.100 3,250.00
11,062.45
21,609.86
21,609.86
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

18.000 1,754,775.00
6.000 532,125.00
2.000 229,075.00
0.300 36,836.25
2,552,811.25

1.100 13,323,750.00
13,323,750.00
15,876,561.25
15,876,561.25

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

18.000 1,754,775.00
6.000 532,125.00
2.000 229,075.00
0.300 36,836.25
2,552,811.25

1.100 7,053,750.00
7,053,750.00
9,606,561.25
9,606,561.25

bongkaran, harga satuan pekerjaan diambil 1/3 dari analisa ini


BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

12.000 1,169,850.00
4.000 354,750.00
1.200 137,445.00
0.200 24,557.50
1,686,602.50

1.100 4,688,750.00
15.000 180,337.50
40.000 325,000.00
0.400 7,500.00
5,201,587.50
6,888,190.00
6,888,190.00
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.100 9,748.75
0.150 13,303.13
0.010 1,145.38
0.0075 920.91
25,118.16

0.0111 47,361.11
0.100 1,875.00
49,236.11
74,354.27
74,354.27

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

18.000 1,754,775.00
6.000 532,125.00
1.800 206,167.50
0.300 36,836.25
2,529,903.75

1.100 4,688,750.00
2.000 37,500.00
4,726,250.00
7,256,153.75
7,256,153.75

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.100 9,748.75
0.100 8,868.75
0.010 1,145.38
0.005 613.94
20,376.81

0.012 51,150.00
0.150 2,812.50
53,962.50
74,339.31
74,339.31
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.100 9,748.75
0.100 8,868.75
0.010 1,145.38
0.050 6,139.38
25,902.25

0.007 40,245.98
0.015 281.25
40,527.23
66,429.48
66,429.48

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.100 9,748.75
0.100 8,868.75
0.010 1,145.38
0.050 6,139.38
25,902.25

0.010 60,375.00
0.025 468.75
60,843.75
86,746.00
86,746.00

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.075 7,311.56
0.150 13,303.13
0.0075 859.03
0.0075 920.91
22,394.63

25.000 78,125.00
78,125.00
100,519.63
100,519.63
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.200 19,497.50
0.400 35,475.00
0.020 2,290.75
0.002 245.58
57,508.83

5.000 34,375.00
8.000 15,000.00
0.032 2,900.00
52,275.00
109,783.83
109,783.83

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.100 9,748.75
0.200 17,737.50
0.010 1,145.38
0.001 122.79
28,754.41

1.620 121,500.00
0.200 3,750.00
125,250.00
154,004.41
154,004.41

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.100 9,748.75
0.200 17,737.50
0.010 1,145.38
0.001 122.79
28,754.41

1.0000 300,000.00
0.200 4,250.00
0.200 5,000.00
309,250.00
338,004.41
338,004.41
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.060 5,849.25
0.120 10,642.50
0.006 687.23
0.006 736.73
17,915.70

0.700 57,312.50
0.020 500.00
57,812.50
75,728.20
75,728.20

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.070 6,824.13
0.150 13,303.13
0.008 916.30
0.006 736.73
21,780.28

0.010 51,750.00
0.300 14,250.00
0.040 750.00
66,750.00
88,530.28
88,530.28

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.150 14,623.13
0.250 22,171.88
0.015 1,718.06
0.013 1,596.24
40,109.30

0.500 40,625.00
0.050 937.50
41,562.50
81,671.80
81,671.80
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.150 14,623.13
0.250 22,171.88
0.015 1,718.06
0.013 1,596.24
40,109.30

2.500 150,000.00
0.050 1,062.50
0.050 1,250.00
152,312.50
192,421.80
192,421.80
Pemasangan Lantai Keramik ukuran 30 x 30 cm Polos ( PPLD.01 / m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu/Semen OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Keramik uk. 30 x 30 cm Polos Ktk 50,000.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
4 Semen Warna Kg 9,375.00

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.44

Pemasangan Lantai Keramik ukuran 30 x 30 cm Warna ( PPLD.02 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu/Semen OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Keramik uk. 30 x 30 cm Warna Ktk 52,500.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
4 Semen Warna Kg 9,375.00

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.47

Pemasangan Lantai Keramik ukuran 30 x 30 cm Warna, Anti Slip ( PPLD.03 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu/Semen OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Keramik uk. 30 x 30 cm Warna Anti Slip Ktk 64,000.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
4 Semen Warna Kg 9,375.00

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.48
Pemasangan Dinding Porselin Putih ukuran 11 x 11 cm ( PPLD.04 / m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Porselen Putih uk. 11 x 11 cm M2 53,125.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
4 Semen Warna Kg 9,375.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.58

Pemasangan Dinding Porselin Warna ukuran 11 x 11 cm ( PPLD.05 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 0.00
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Porselen Warna uk. 11 x 11 cm M2 56,250.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
4 Semen Warna Kg 9,375.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.59

Pemasangan Dinding Keramik ukuran 30 x 30 cm ( PPLD.06 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 0.00
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Keramik uk. 30 x 30 cm Polos Ktk 50,000.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M 3
90,625.00
4 Semen Warna Kg 9,375.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.68

Pemasangan Dinding Keramik ukuran 20 x 25 cm ( PPLD.06.a / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu OH 0.00
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Keramik uk. 20 x 25 cm Polos Ktk 55,000.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M 3
90,625.00
4 Semen Warna Kg 9,375.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.68

Pemasangan Lantai Keramik ukuran 40 x 40 cm Warna ( PPLD.02.a / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu/Semen OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Keramik uk. 40 x 40 cm Warna Ktk 85,000.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
4 Semen Warna Kg 9,375.00
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.47

Pemasangan Lantai Keramik ukuran 20 x 20 cm Warna, Anti Slip ( PPLD.03.a / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Batu/Semen OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Keramik uk. 20 x 20 cm Warna Anti Slip Ktk 55,000.00
2 Semen Portland Kg 1,875.00
3 Pasir Beton/Pasang M3 90,625.00
4 Semen Warna Kg 9,375.00

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.48
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.350 34,120.63
0.620 54,986.25
0.035 4,008.81
0.030 3,683.63
96,799.31

1.000 50,000.00
11.380 21,337.50
0.042 3,806.25
0.100 937.50
76,081.25
172,880.56
172,880.56

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.350 34,120.63
0.620 54,986.25
0.035 4,008.81
0.030 3,683.63
96,799.31

1.000 52,500.00
11.380 21,337.50
0.042 3,806.25
0.100 937.50
78,581.25
175,380.56
175,380.56

30 x 30 cm Warna, Anti Slip ( PPLD.03 / m 2 )


BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.350 34,120.63
0.620 54,986.25
0.035 4,008.81
0.030 3,683.63
96,799.31

1.000 64,000.00
11.380 21,337.50
0.042 3,806.25
0.100 937.50
90,081.25
186,880.56
186,880.56
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.500 48,743.75
0.620 54,986.25
0.050 5,726.88
0.030 3,683.63
113,140.50

1.000 53,125.00
9.300 17,437.50
0.018 1,631.25
0.100 937.50
73,131.25
186,271.75
186,271.75

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.500 0.00
0.620 54,986.25
0.050 5,726.88
0.030 3,683.63
64,396.75

1.000 56,250.00
9.300 17,437.50
0.018 1,631.25
0.100 937.50
76,256.25
140,653.00
140,653.00

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.100 0.00
0.600 53,212.50
0.045 5,154.19
0.030 3,683.63
62,050.31

1.000 50,000.00
9.300 17,437.50
0.018 1,631.25
0.100 937.50
70,006.25
132,056.56
132,056.56

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.100 0.00
0.600 53,212.50
0.045 5,154.19
0.030 3,683.63
62,050.31

1.000 55,000.00
9.300 17,437.50
0.018 1,631.25
0.100 937.50
75,006.25
137,056.56
137,056.56

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.350 34,120.63
0.620 54,986.25
0.035 4,008.81
0.030 3,683.63
96,799.31

1.000 85,000.00
11.380 21,337.50
0.042 3,806.25
0.100 937.50
111,081.25
207,880.56
207,880.56

20 x 20 cm Warna, Anti Slip ( PPLD.03.a / m 2 )


BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.350 34,120.63
0.620 54,986.25
0.035 4,008.81
0.030 3,683.63
96,799.31

1.000 55,000.00
11.380 21,337.50
0.042 3,806.25
0.100 937.50
81,081.25
177,880.56
177,880.56
Pemasangan Langit-langit Tripleks t = 3 mm + Rangka Kayu Kelas II ( PL.01 / m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Kelas II M3 4,262,500.00
2 Tripleks t = 3 mm Lbr 11,250.00
3 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2838 - 6.21

Pemasangan Langit-langit Gypsum Board t = 9 mm + Rangka Kayu Kelas II ( PL.02 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Kelas II M3 4,262,500.00
2 Gypsum Board t = 9 mm Lbr #NAME?
3 Paku Gypsum Kg 36,250.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = SNI.2838 - 6.21 Bahan = SNI.2838 - 6.24

Pemasangan Langit-langit GRC T = 4 mm + Rangka Kayu Kelas II ( PL.03 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
No. URAIAN PEKERJAAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Kayu Kelas II M3 4,262,500.00
2 GRC t = 4 mm Lbr 84,375.00
3 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = SNI.2838 - 6.21 Bahan = SNI.2838 - 6.24
Pemasangan Langit-langit Jalusi / Reng Lat Kayu Kelas I ( PL.04 / m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Kayu OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Papan Reng Lat Kayu Kelas I M3 4,125,000.00
2 Paku Kg 18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2838 - 6.16

Pendempulan dan Penggosokan Permukaan yang akan Dicat ( PC.01 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Cat OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Dempul Kg 28,750.00
2 Amplas Lbr 3,125.00

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.6

Pengecatan Bidang Kayu Lama ( PC.02 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Cat OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Cat Kilat Kg 41,250.00

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.7 & 6.8
Pengecatan Bidang Kayu Baru (1 Lapis Plamur), 1 Lapis Cat Dasar,
1 Lapis Cat Penutup ( PC.03 / m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Cat OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Plamur Kg 53,125.00
2 Cat Dasar Kayu Kg 33,750.00
3 Cat Kilat Kg 41,250.00

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.8

Pengecatan Bidang Kayu dengan Vernis ( PC.04 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Cat OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Vernis Ltr 46,875.00

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.13

Pengecatan Tembok Baru (1 Lapis Plamur), 1 Lapis Cat Dasar,


1 Lapis Cat Penutup ( PC.05 / m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Cat OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Plamur Kg 53,125.00
2 Cat Dasar Tembok Kg 43,750.00
3 Cat Tembok Ltr 112,500.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.14
Pengecatan Tembok Lama ( PC.06 / m 2 )
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Cat OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Cat Tembok 2 kali Kg 112,500.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.15

Pengecatan Permukaan Besi / Baja dengan Meni Besi ( PC.07 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Cat OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Meni Besi Kg 33,750.00
2 Minyak Cat / Thinner Ltr 18,750.00

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.20

Pengecatan Atap Seng ( PC.08 / m 2 )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Tukang Cat OH 97,487.50
2 Pekerja OH 88,687.50
3 Kepala Tukang OH 114,537.50
4 Mandor OH 122,787.50
Jumlah
B BAHAN
1 Meni Besi Kg 33,750.00
2 Minyak Cat / Thinner Ltr 18,750.00

C Jumlah A + B
D Harga Satuan
Acuan : Upah = K.23 Bahan = K.18 & K.21
3 mm + Rangka Kayu Kelas II ( PL.01 / m 2 )
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.400 38,995.00
0.270 23,945.63
0.040 4,581.50
0.0135 1,657.63
69,179.76

0.023 98,037.50
0.347 3,906.23
0.060 1,125.00
103,068.73
172,248.48
172,248.48

oard t = 9 mm + Rangka Kayu Kelas II ( PL.02 / m 2 )


BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.400 38,995.00
0.270 23,945.63
0.040 4,581.50
0.0135 1,657.63
69,179.76

0.023 98,037.50
0.347 #NAME?
0.110 3,987.50
#NAME?
#NAME?
#NAME?

4 mm + Rangka Kayu Kelas II ( PL.03 / m 2 )


BIAYA
KUANTITAS SATUAN
KUANTITAS
( Rp. )
5 6

0.400 38,995.00
0.270 23,945.63
0.040 4,581.50
0.0135 1,657.63
69,179.76

0.023 98,037.50
0.347 29,296.69
0.110 2,062.50
129,396.69
198,576.44
198,576.44
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.600 58,492.50
0.200 17,737.50
0.060 6,872.25
0.010 1,227.88
84,330.13

0.010 41,250.00
0.060 1,125.00
42,375.00
126,705.13
126,705.13

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.040 3,899.50
0.040 3,547.50
0.004 458.15
0.0025 306.97
8,212.12

0.080 2,300.00
2.000 6,250.00
8,550.00
16,762.12
16,762.12

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.009 877.39
0.070 6,208.13
0.006 687.23
0.0025 306.97
8,079.71

0.170 7,012.50
7,012.50
15,092.21
15,092.21
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.009 877.39
0.070 6,208.13
0.006 687.23
0.0025 306.97
8,079.71

0.150 7,968.75
0.170 5,737.50
0.130 5,362.50
19,068.75
27,148.46
27,148.46

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.160 15,598.00
0.160 14,190.00
0.016 1,832.60
0.0025 306.97
31,927.57

0.150 7,031.25
7,031.25
38,958.82
38,958.82

BIAYA
KUANTITAS
KUANTITAS SATUAN
( Rp. )
5 6

0.063 6,141.71
0.020 1,773.75
0.0063 721.59
0.0025 306.97
8,944.02

0.100 5,312.50
0.100 4,375.00
0.130 14,625.00
24,312.50
33,256.52
33,256.52
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.042 4,094.48
0.028 2,483.25
0.0042 481.06
0.0025 306.97
7,365.75

0.180 20,250.00
20,250.00
27,615.75
27,615.75

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.200 19,497.50
0.020 1,773.75
0.020 2,290.75
0.010 1,227.88
24,789.88

0.100 3,375.00
0.0012 22.50
3,375.00
28,164.88
28,164.88

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6
0.075 7,311.56
0.050 4,434.38
0.0075 859.03
0.0025 306.97
12,911.94

0.120 4,050.00
0.0014 27.00
4,050.00
16,961.94
16,961.94
Bilangan Yan
Trilyun
Ratus Milyar
Puluhan Milyar
Ratus Juta
Puluhan Juta
- Rupiah - Sen Ratus Ribu
1 Satu 10.00 Sepuluh 0.01 Satu Puluhan Ribu
2 Dua 20.00 Dua Puluh 0.01 Satu Ratusan
3 Tiga 30.00 Tiga Puluh 0.01 Satu Puluhan
4 Empat 40.00 Empat Puluh 0.01 Satu Rupiah
5 Lima 50.00 Lima Puluh 0.01 Satu Sen
Hasil (akan keluar otomatis).
6 Enam 60.00 Enam Puluh 0.02 Dua
7 Tujuh 70.00 Tujuh Puluh 0.02 Dua
8 Delapan 80.00 Delapan Puluh 0.02 Dua
9 Sembilan 90.00 Sembilan Pulu 0.02 Dua Terbilang:
10 Sepuluh 100.00 Seratus 0.02 Dua Delapan Ratus Tujuh Pulu
11 Sebelas 200.00 Dua Ratus 0.02 Dua
12 Dua Belas 300.00 Tiga Ratus 0.02 Dua
13 Tiga Belas 400.00 Empat Ratus 0.02 Dua Note: Don't change
14 Empat Belas 500.00 Lima Ratus 0.02 Dua
15 Lima Belas 600.00 Enam Ratus 0.02 Dua How to Use
16 Enam Belas 700.00 Tujuh Ratus 0.03 Tiga
17 Tujuh Belas 800.00 Delapan Ratus 0.03 Tiga
18 Delapan Bela 900.00 Sembilan Ratu 0.03 Tiga
19 Sembilan Bela 1,000.00 Seribu 0.03 Tiga
20 Dua Puluh 2,000.00 Dua Ribu 0.03 Tiga
21 Dua Puluh Sa 3,000.00 Tiga Ribu 0.03 Tiga
22 Dua Puluh Du 4,000.00 Empat Ribu 0.03 Tiga
23 Dua Puluh Tig 5,000.00 Lima Ribu 0.03 Tiga
24 Dua Puluh Em 6,000.00 Enam Ribu 0.03 Tiga
25 Dua Puluh Li 7,000.00 Tujuh Ribu 0.03 Tiga
26 Dua Puluh En 8,000.00 Delapan Ribu 0.04 Empat
27 Dua Puluh Tuj 9,000.00 Sembilan Ribu 0.04 Empat
28 Dua Puluh De 10,000.00 Sepuluh Ribu 0.04 Empat
29 Dua Puluh Se 11,000.00 Sebelas Ribu 0.04 Empat
30 Tiga Puluh 12,000.00 Dua Belas Rib 0.04 Empat
31 Tiga Puluh Sa 13,000.00 Tiga Belas Rib 0.04 Empat
32 Tiga Puluh Du 14,000.00 Empat Belas R 0.04 Empat
33 Tiga Puluh Tig 15,000.00 Lima Belas Ri 0.04 Empat
34 Tiga Puluh Em 16,000.00 Enam Belas Ri 0.04 Empat
35 Tiga Puluh Li 17,000.00 Tujuh Belas R 0.04 Empat
36 Tiga Puluh E 18,000.00 Delapan Belas 0.05 Lima
37 Tiga Puluh Tu 19,000.00 Sembilan Bela 0.05 Lima
38 Tiga Puluh De 20,000.00 Dua Puluh Rib 0.05 Lima
39 Tiga Puluh Se 21,000.00 Dua Puluh Sat 0.05 Lima
40 Empat Puluh 22,000.00 Dua Puluh Dua 0.05 Lima
41 Empat Puluh 23,000.00 Dua Puluh Tig 0.05 Lima
42 Empat Puluh 24,000.00 Dua Puluh Emp 0.05 Lima
43 Empat Puluh T 25,000.00 Dua Puluh Lim 0.05 Lima
44 Empat Puluh 26,000.00 Dua Puluh En 0.05 Lima
45 Empat Puluh 27,000.00 Dua Puluh Tuj 0.05 Lima
46 Empat Puluh 28,000.00 Dua Puluh Del 0.06 Enam
47 Empat Puluh T 29,000.00 Dua Puluh Sem 0.06 Enam
48 Empat Puluh 30,000.00 Tiga Puluh Rib 0.06 Enam
49 Empat Puluh 31,000.00 Tiga Puluh Sa 0.06 Enam
50 Lima Puluh 32,000.00 Tiga Puluh Du 0.06 Enam
51 Lima Puluh Sa 33,000.00 Tiga Puluh Tig 0.06 Enam
52 Lima Puluh D 34,000.00 Tiga Puluh Em 0.06 Enam
53 Lima Puluh Ti 35,000.00 Tiga Puluh Li 0.06 Enam
54 Lima Puluh E 36,000.00 Tiga Puluh En 0.06 Enam
55 Lima Puluh Li 37,000.00 Tiga Puluh Tuj 0.06 Enam
56 Lima Puluh E 38,000.00 Tiga Puluh De 0.07 Tujuh
57 Lima Puluh Tu 39,000.00 Tiga Puluh Se 0.07 Tujuh
58 Lima Puluh D 40,000.00 Empat Puluh R 0.07 Tujuh
59 Lima Puluh Se 41,000.00 Empat Puluh S 0.07 Tujuh
60 Enam Puluh 42,000.00 Empat Puluh D 0.07 Tujuh
61 Enam Puluh S 43,000.00 Empat Puluh T 0.07 Tujuh
62 Enam Puluh D 44,000.00 Empat Puluh 0.07 Tujuh
63 Enam Puluh T 45,000.00 Empat Puluh L 0.07 Tujuh
64 Enam Puluh E 46,000.00 Empat Puluh 0.07 Tujuh
65 Enam Puluh L 47,000.00 Empat Puluh T 0.07 Tujuh
66 Enam Puluh 48,000.00 Empat Puluh D 0.08 Delapan
67 Enam Puluh T 49,000.00 Empat Puluh S 0.08 Delapan
68 Enam Puluh D 50,000.00 Lima Puluh Ri 0.08 Delapan
69 Enam Puluh S 51,000.00 Lima Puluh Sa 0.08 Delapan
70 Tujuh Puluh 52,000.00 Lima Puluh Du 0.08 Delapan
71 Tujuh Puluh S 53,000.00 Lima Puluh Ti 0.08 Delapan
72 Tujuh Puluh D 54,000.00 Lima Puluh Em 0.08 Delapan
73 Tujuh Puluh T 55,000.00 Lima Puluh Li 0.08 Delapan
74 Tujuh Puluh E 56,000.00 Lima Puluh En 0.08 Delapan
75 Tujuh Puluh L 57,000.00 Lima Puluh Tu 0.08 Delapan
76 Tujuh Puluh 58,000.00 Lima Puluh De 0.09 Sembilan
77 Tujuh Puluh T 59,000.00 Lima Puluh Se 0.09 Sembilan
78 Tujuh Puluh D 60,000.00 Enam Puluh R 0.09 Sembilan
79 Tujuh Puluh S 61,000.00 Enam Puluh Sa 0.09 Sembilan
80 Delapan Pulu 62,000.00 Enam Puluh D 0.09 Sembilan
81 Delapan Puluh 63,000.00 Enam Puluh Ti 0.09 Sembilan
82 Delapan Pulu 64,000.00 Enam Puluh E 0.09 Sembilan
83 Delapan Puluh 65,000.00 Enam Puluh Li 0.09 Sembilan
84 Delapan Pulu 66,000.00 Enam Puluh E 0.09 Sembilan
85 Delapan Pulu 67,000.00 Enam Puluh Tu 0.09 Sembilan
86 Delapan Pulu 68,000.00 Enam Puluh D 0.10 Sepuluh
87 Delapan Puluh 69,000.00 Enam Puluh Se 0.10 Sepuluh
88 Delapan Pulu 70,000.00 Tujuh Puluh R 0.10 Sepuluh
89 Delapan Pulu 71,000.00 Tujuh Puluh S 0.10 Sepuluh
90 Sembilan Pul 72,000.00 Tujuh Puluh D 0.10 Sepuluh
91 Sembilan Pulu 73,000.00 Tujuh Puluh Ti 0.10 Sepuluh
92 Sembilan Pul 74,000.00 Tujuh Puluh E 0.10 Sepuluh
93 Sembilan Pulu 75,000.00 Tujuh Puluh L 0.10 Sepuluh
94 Sembilan Pul 76,000.00 Tujuh Puluh E 0.10 Sepuluh
95 Sembilan Pulu 77,000.00 Tujuh Puluh T 0.10 Sepuluh
96 Sembilan Pul 78,000.00 Tujuh Puluh D 0.11 Sebelas
97 Sembilan Pulu 79,000.00 Tujuh Puluh S 0.11 Sebelas
98 Sembilan Pul 80,000.00 Delapan Puluh 0.11 Sebelas
99 Sembilan Pulu 81,000.00 Delapan Puluh 0.11 Sebelas
82,000.00 Delapan Puluh 0.11 Sebelas
83,000.00 Delapan Puluh 0.11 Sebelas
84,000.00 Delapan Puluh 0.11 Sebelas
85,000.00 Delapan Puluh 0.11 Sebelas
86,000.00 Delapan Pulu 0.11 Sebelas
87,000.00 Delapan Puluh 0.11 Sebelas
88,000.00 Delapan Puluh 0.12 Dua Belas
89,000.00 Delapan Puluh 0.12 Dua Belas
90,000.00 Sembilan Pulu 0.12 Dua Belas
91,000.00 Sembilan Pulu 0.12 Dua Belas
92,000.00 Sembilan Pulu 0.12 Dua Belas
93,000.00 Sembilan Pulu 0.12 Dua Belas
94,000.00 Sembilan Pulu 0.12 Dua Belas
95,000.00 Sembilan Pulu 0.12 Dua Belas
96,000.00 Sembilan Pulu 0.12 Dua Belas
97,000.00 Sembilan Pulu 0.12 Dua Belas
98,000.00 Sembilan Pulu 0.13 Tiga Belas
99,000.00 Sembilan Pulu 0.13 Tiga Belas
100,000.00 Seratus 0.13 Tiga Belas
200,000.00 Dua Ratus 0.13 Tiga Belas
300,000.00 Tiga Ratus 0.13 Tiga Belas
400,000.00 Empat Ratus 0.13 Tiga Belas
500,000.00 Lima Ratus 0.13 Tiga Belas
600,000.00 Enam Ratus 0.13 Tiga Belas
700,000.00 Tujuh Ratus 0.13 Tiga Belas
800,000.00 Delapan Ratus 0.13 Tiga Belas
900,000.00 Sembilan Ratu 0.14 Empat Belas
### Satu Juta 0.14 Empat Belas
### Dua Juta 0.14 Empat Belas
### Tiga Juta 0.14 Empat Belas
### Empat Juta 0.14 Empat Belas
### Lima Juta 0.14 Empat Belas
### Enam Juta 0.14 Empat Belas
### Tujuh Juta 0.14 Empat Belas
### Delapan Juta 0.14 Empat Belas
### Sembilan Juta 0.14 Empat Belas
### Sepuluh Juta 0.15 Lima Belas
### Sebelas Juta 0.15 Lima Belas
### Dua Belas Jut 0.15 Lima Belas
### Tiga Belas Jut 0.15 Lima Belas
### Empat Belas J 0.15 Lima Belas
### Lima Belas Ju 0.15 Lima Belas
### Enam Belas Ju 0.15 Lima Belas
### Tujuh Belas Ju 0.15 Lima Belas
### Delapan Belas 0.15 Lima Belas
### Sembilan Bela 0.15 Lima Belas
### Dua Puluh Jut 0.16 Enam Belas
### Dua Puluh Sat 0.16 Enam Belas
### Dua Puluh Dua 0.16 Enam Belas
### Dua Puluh Tig 0.16 Enam Belas
### Dua Puluh Emp 0.16 Enam Belas
### Dua Puluh Lim 0.16 Enam Belas
### Dua Puluh En 0.16 Enam Belas
### Dua Puluh Tuj 0.16 Enam Belas
### Dua Puluh Del 0.16 Enam Belas
### Dua Puluh Sem 0.16 Enam Belas
### Tiga Puluh Jut 0.17 Tujuh Belas
### Tiga Puluh Sat 0.17 Tujuh Belas
### Tiga Puluh Du 0.17 Tujuh Belas
### Tiga Puluh Tig 0.17 Tujuh Belas
### Tiga Puluh Em 0.17 Tujuh Belas
### Tiga Puluh Lim 0.17 Tujuh Belas
### Tiga Puluh En 0.17 Tujuh Belas
### Tiga Puluh Tuj 0.17 Tujuh Belas
### Tiga Puluh De 0.17 Tujuh Belas
### Tiga Puluh Se 0.17 Tujuh Belas
### Empat Puluh J 0.18 Delapan Belas
### Empat Puluh S 0.18 Delapan Belas
### Empat Puluh D 0.18 Delapan Belas
### Empat Puluh T 0.18 Delapan Belas
### Empat Puluh E 0.18 Delapan Belas
### Empat Puluh L 0.18 Delapan Belas
### Empat Puluh 0.18 Delapan Belas
### Empat Puluh T 0.18 Delapan Belas
### Empat Puluh D 0.18 Delapan Belas
### Empat Puluh S 0.18 Delapan Belas
### Lima Puluh Ju 0.19 Sembilan Belas
### Lima Puluh Sa 0.19 Sembilan Belas
### Lima Puluh Du 0.19 Sembilan Belas
### Lima Puluh Tig 0.19 Sembilan Belas
### Lima Puluh Em 0.19 Sembilan Belas
### Lima Puluh Li 0.19 Sembilan Belas
### Lima Puluh En 0.19 Sembilan Belas
### Lima Puluh Tu 0.19 Sembilan Belas
### Lima Puluh De 0.19 Sembilan Belas
### Lima Puluh Se 0.19 Sembilan Belas
### Enam Puluh Ju 0.20 Dua Puluh
### Enam Puluh Sa 0.20 Dua Puluh
### Enam Puluh D 0.20 Dua Puluh
### Enam Puluh Ti 0.20 Dua Puluh
### Enam Puluh E 0.20 Dua Puluh
### Enam Puluh Li 0.20 Dua Puluh
### Enam Puluh E 0.20 Dua Puluh
### Enam Puluh Tu 0.20 Dua Puluh
### Enam Puluh De 0.20 Dua Puluh
### Enam Puluh Se 0.20 Dua Puluh
### Tujuh Puluh Ju 0.21 Dua Puluh Satu
### Tujuh Puluh Sa 0.21 Dua Puluh Satu
### Tujuh Puluh D 0.21 Dua Puluh Satu
### Tujuh Puluh Ti 0.21 Dua Puluh Satu
### Tujuh Puluh E 0.21 Dua Puluh Satu
### Tujuh Puluh L 0.21 Dua Puluh Satu
### Tujuh Puluh E 0.21 Dua Puluh Satu
### Tujuh Puluh Tu 0.21 Dua Puluh Satu
### Tujuh Puluh D 0.21 Dua Puluh Satu
### Tujuh Puluh S 0.21 Dua Puluh Satu
### Delapan Puluh 0.22 Dua Puluh Dua
### Delapan Puluh 0.22 Dua Puluh Dua
### Delapan Puluh 0.22 Dua Puluh Dua
### Delapan Puluh 0.22 Dua Puluh Dua
### Delapan Puluh 0.22 Dua Puluh Dua
### Delapan Puluh 0.22 Dua Puluh Dua
### Delapan Puluh 0.22 Dua Puluh Dua
### Delapan Puluh 0.22 Dua Puluh Dua
### Delapan Puluh 0.22 Dua Puluh Dua
### Delapan Puluh 0.22 Dua Puluh Dua
### Sembilan Pulu 0.23 Dua Puluh Tiga
### Sembilan Pulu 0.23 Dua Puluh Tiga
### Sembilan Pulu 0.23 Dua Puluh Tiga
### Sembilan Pulu 0.23 Dua Puluh Tiga
### Sembilan Pulu 0.23 Dua Puluh Tiga
### Sembilan Pulu 0.23 Dua Puluh Tiga
### Sembilan Pulu 0.23 Dua Puluh Tiga
### Sembilan Pulu 0.23 Dua Puluh Tiga
### Sembilan Pulu 0.23 Dua Puluh Tiga
### Sembilan Pulu 0.23 Dua Puluh Tiga
### Seratus 0.24 Dua Puluh Empat
### Dua Ratus 0.24 Dua Puluh Empat
### Tiga Ratus 0.24 Dua Puluh Empat
### Empat Ratus 0.24 Dua Puluh Empat
### Lima Ratus 0.24 Dua Puluh Empat
### Enam Ratus 0.24 Dua Puluh Empat
### Tujuh Ratus 0.24 Dua Puluh Empat
### Delapan Ratus 0.24 Dua Puluh Empat
### Sembilan Ratu 0.24 Dua Puluh Empat
### Satu Milyar 0.24 Dua Puluh Empat
### Dua Milyar 0.25 Dua Puluh Lima
### Tiga Milyar 0.25 Dua Puluh Lima
### Empat Milyar 0.25 Dua Puluh Lima
### Lima Milyar 0.25 Dua Puluh Lima
### Enam Milyar 0.25 Dua Puluh Lima
### Tujuh Milyar 0.25 Dua Puluh Lima
### Delapan Milya 0.25 Dua Puluh Lima
### Sembilan Milya 0.25 Dua Puluh Lima
### Sepuluh Milyar 0.25 Dua Puluh Lima
### Sebelas Milyar 0.25 Dua Puluh Lima
### Dua Belas Mily 0.26 Dua Puluh Enam
### Tiga Belas Mil 0.26 Dua Puluh Enam
### Empat Belas M 0.26 Dua Puluh Enam
### Lima Belas Mil 0.26 Dua Puluh Enam
### Enam Belas Mi 0.26 Dua Puluh Enam
### Tujuh Belas Mi 0.26 Dua Puluh Enam
### Delapan Belas 0.26 Dua Puluh Enam
### Sembilan Belas 0.26 Dua Puluh Enam
### Dua Puluh Mil 0.26 Dua Puluh Enam
### Dua Puluh Sat 0.26 Dua Puluh Enam
### Dua Puluh Dua 0.27 Dua Puluh Tujuh
### Dua Puluh Tiga 0.27 Dua Puluh Tujuh
### Dua Puluh Emp 0.27 Dua Puluh Tujuh
### Dua Puluh Lim 0.27 Dua Puluh Tujuh
### Dua Puluh Ena 0.27 Dua Puluh Tujuh
### Dua Puluh Tuju 0.27 Dua Puluh Tujuh
### Dua Puluh Del 0.27 Dua Puluh Tujuh
### Dua Puluh Sem 0.27 Dua Puluh Tujuh
### Tiga Puluh Mil 0.27 Dua Puluh Tujuh
### Tiga Puluh Sat 0.27 Dua Puluh Tujuh
### Tiga Puluh Dua 0.28 Dua Puluh Delapan
### Tiga Puluh Tig 0.28 Dua Puluh Delapan
### Tiga Puluh Em 0.28 Dua Puluh Delapan
### Tiga Puluh Lim 0.28 Dua Puluh Delapan
### Tiga Puluh En 0.28 Dua Puluh Delapan
### Tiga Puluh Tuj 0.28 Dua Puluh Delapan
### Tiga Puluh Del 0.28 Dua Puluh Delapan
### Tiga Puluh Sem 0.28 Dua Puluh Delapan
### Empat Puluh M 0.28 Dua Puluh Delapan
### Empat Puluh S 0.28 Dua Puluh Delapan
### Empat Puluh D 0.29 Dua Puluh Sembilan
### Empat Puluh T 0.29 Dua Puluh Sembilan
### Empat Puluh E 0.29 Dua Puluh Sembilan
### Empat Puluh L 0.29 Dua Puluh Sembilan
### Empat Puluh E 0.29 Dua Puluh Sembilan
### Empat Puluh T 0.29 Dua Puluh Sembilan
### Empat Puluh D 0.29 Dua Puluh Sembilan
### Empat Puluh S 0.29 Dua Puluh Sembilan
### Lima Puluh Mil 0.29 Dua Puluh Sembilan
### Lima Puluh Sat 0.29 Dua Puluh Sembilan
### Lima Puluh Du 0.30 Tiga Puluh
### Lima Puluh Tig 0.30 Tiga Puluh
### Lima Puluh Em 0.30 Tiga Puluh
### Lima Puluh Li 0.30 Tiga Puluh
### Lima Puluh En 0.30 Tiga Puluh
### Lima Puluh Tuj 0.30 Tiga Puluh
### Lima Puluh De 0.30 Tiga Puluh
### Lima Puluh Se 0.30 Tiga Puluh
### Enam Puluh Mi 0.30 Tiga Puluh
### Enam Puluh Sa 0.30 Tiga Puluh
### Enam Puluh Du 0.31 Tiga Puluh Satu
### Enam Puluh Ti 0.31 Tiga Puluh Satu
### Enam Puluh Em 0.31 Tiga Puluh Satu
### Enam Puluh Li 0.31 Tiga Puluh Satu
### Enam Puluh E 0.31 Tiga Puluh Satu
### Enam Puluh Tu 0.31 Tiga Puluh Satu
### Enam Puluh De 0.31 Tiga Puluh Satu
### Enam Puluh Se 0.31 Tiga Puluh Satu
### Tujuh Puluh Mi 0.31 Tiga Puluh Satu
### Tujuh Puluh Sa 0.31 Tiga Puluh Satu
### Tujuh Puluh D 0.32 Tiga Puluh Dua
### Tujuh Puluh Ti 0.32 Tiga Puluh Dua
### Tujuh Puluh E 0.32 Tiga Puluh Dua
### Tujuh Puluh Li 0.32 Tiga Puluh Dua
### Tujuh Puluh E 0.32 Tiga Puluh Dua
### Tujuh Puluh Tu 0.32 Tiga Puluh Dua
### Tujuh Puluh D 0.32 Tiga Puluh Dua
### Tujuh Puluh S 0.32 Tiga Puluh Dua
### Delapan Puluh 0.32 Tiga Puluh Dua
### Delapan Puluh 0.32 Tiga Puluh Dua
### Delapan Puluh 0.33 Tiga Puluh Tiga
### Delapan Puluh 0.33 Tiga Puluh Tiga
### Delapan Puluh 0.33 Tiga Puluh Tiga
### Delapan Puluh 0.33 Tiga Puluh Tiga
### Delapan Puluh 0.33 Tiga Puluh Tiga
### Delapan Puluh 0.33 Tiga Puluh Tiga
### Delapan Puluh 0.33 Tiga Puluh Tiga
### Delapan Puluh 0.33 Tiga Puluh Tiga
### Sembilan Pulu 0.33 Tiga Puluh Tiga
### Sembilan Pulu 0.33 Tiga Puluh Tiga
### Sembilan Pulu 0.34 Tiga Puluh Empat
### Sembilan Puluh 0.34 Tiga Puluh Empat
### Sembilan Pulu 0.34 Tiga Puluh Empat
### Sembilan Pulu 0.34 Tiga Puluh Empat
### Sembilan Pulu 0.34 Tiga Puluh Empat
### Sembilan Pulu 0.34 Tiga Puluh Empat
### Sembilan Pulu 0.34 Tiga Puluh Empat
### Sembilan Pulu 0.34 Tiga Puluh Empat
### Seratus 0.34 Tiga Puluh Empat
### Dua Ratus 0.34 Tiga Puluh Empat
### Tiga Ratus 0.35 Tiga Puluh Lima
### Empat Ratus 0.35 Tiga Puluh Lima
### Lima Ratus 0.35 Tiga Puluh Lima
### Enam Ratus 0.35 Tiga Puluh Lima
### Tujuh Ratus 0.35 Tiga Puluh Lima
### Delapan Ratus 0.35 Tiga Puluh Lima
### Sembilan Ratu 0.35 Tiga Puluh Lima
### Satu Trilyun 0.35 Tiga Puluh Lima
### Dua Trilyun 0.35 Tiga Puluh Lima
### Tiga Trilyun 0.35 Tiga Puluh Lima
### Empat Trilyun 0.36 Tiga Puluh Enam
### Lima Trilyun 0.36 Tiga Puluh Enam
### Enam Trilyun 0.36 Tiga Puluh Enam
### Tujuh Trilyun 0.36 Tiga Puluh Enam
### Delapan Trilyu 0.36 Tiga Puluh Enam
### Sembilan Trily 0.36 Tiga Puluh Enam
### Sepuluh Trilyu 0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
1.00
1.00
1.00
1.00
1.00
PROGRAM TERBILANG
OLEH : WIJI NUGROHO
Masukkan nilai
PTangka
ATLAS yang
INT.
dimaksud (akan
diterjemahkan dalam huruf)

874,998,000.00
-
-
uluhan Milyar -
800,000,000.00 Delapan Ratus
74,000,000.00 Tujuh Puluh Empat Juta
900,000.00 Sembilan Ratus
uluhan Ribu 98,000.00 Sembilan Puluh Delapan Ribu
-
-
- Rupiah
- 0.01
kan keluar otomatis).
- 0.01
0.01
Cek Bilangan 874,998,000.00 ok!

elapan Ratus Tujuh Puluh Empat Juta Sembilan Ratus Sembilan Puluh Delapan Ribu Rupiah

Note: Don't change any thing without confirmation. It could be dangerous !!!

1. Hubungkan cell yang akan diterjemahkan pada worksheet rekapitulasi pada "cell G2"
2. Hubungkan hasil di "cell F14" ke tempat "terbilang" pada worksheet rekapitulasi
3. Have a nice season
Regulator 65000
Selang 20000
kran 10000
Cekak 4500
Minjet 60000
Karbulator 75000
234500