01 Proportional Control
01 Proportional Control
COVER
1
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL CONTROL)
Contents
1. Tata Tertib Peserta Praktikum.......................................................................................................3
2. Denah Lokasi dan Jalur Evakuasi...................................................................................................4
3. Petunjuk Praktikum.......................................................................................................................5
3.1 Sifat.........................................................................................................................................5
3.2 Tujuan......................................................................................................................................5
3.3 Bahan/Reagen........................................................................................................................5
3.4 Peralatan.................................................................................................................................5
3.5 Keselamatan Kerja...................................................................................................................6
3.6 Dasar Teori..............................................................................................................................6
3.7 Langkah Kerja..........................................................................................................................7
3.8 Perhitungan...........................................................................................................................12
3.9 Tugas......................................................................................................................................12
3.10 Data hasil praktikum............................................................................................................13
3.11 Pembahasan dan Kesimpulan..............................................................................................16
2
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL CONTROL)
3
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL CONTROL)
4
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL CONTROL)
3. Petunjuk Praktikum
3.1 Sifat
Keterampilan Pengenalan
Pembuktian Percobaan
3.2 Tujuan
Setelah mengikuti praktikum ini peserta mampu:
Mensetting Proportional Controller dan mengetahui cara kerjanya.
3.3 Bahan/Reagen
-
3.4 Peralatan
a) Proportional + Integral + Derivative Controller SLCD
5
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL CONTROL)
c) Kabel penghubung
Switch 220 V AC
3. Ubah posisi switch pada aksi (ACTION) controller menjadi direct, TUNING Enable dan
START HOT.
Switch START
7
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL CONTROL)
Switch Tuning
Switch Action
4. Tekan tombol M pada bagian depan controller untuk memposisikan Controler pada
posisi manual.
Tombol M
8
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL CONTROL)
8. Tentukan Integral Time pada Nilai Maksimum (9999) dan Derivative Time pada Nilai
Minimum (0)
9. Beri bias output sebesar 50 % dengan mengatur secara manual dari tombol atau dari
slider
9
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL CONTROL)
10. Tunggu 15 detik dan tekan tombol Auto (A) pada bagian depan controller untuk
membuat controller menjadi bekerja secara Otomatis
Tombol A
11. Secara bertahap, atur tegangan masukan dari Sumber tegangan luar (PV) sehingga e =
10 % sampai nilai dari PV
10
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL CONTROL)
14. Ulangi langkah 3 sampai langkah 13 untuk aksi reverse dari controller
11
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL CONTROL)
3.8 Perhitungan
Menghitung Manipulated Variable (MV) dengan rumus
Mv Kc.e b
3.9 Tugas
a. Mengisi tabel input Vs Output untuk
1) Bias output 50 % dengan PB 200%, 100% dan 50% pada
kertas yang sama
2) Langkah 2) dengan output bias 25 % dan 75 %
b. Bandingkan dengan tabel hasil perhitungan :
Mv Kc.e b
c. Bagaimana sifat controller ini bila dipakai dalam system pengaturan otomatis, berikan
alasan yang tepat
d. Beri kesimpulan saudara
12
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL CONTROL)
13
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL CONTROL)
Untuk Bias = 25 %
14
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL CONTROL)
Untuk Bias = 75 %
15
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL CONTROL)
16