Anda di halaman 1dari 64

ENGINEERING ESTIMATE

PEKERJAAN : PENGEMBANGAN LABORATORIUM KIMIA


LOKASI : KAMPUS POLITEKNIK NEGERI LAMPUNG
TAHUN ANGGARAN : 2019

REKAPITULASI

NO URAIAN PEKERJAAN NILAI PEKERJAAN


A PERSIAPAN Rp. 7,500,000.00
B PEKERJAAN TANAH,PASANGAN Dan DINDING Rp. 46,482,685.97

C PEKERJAAN ATAP DAN PLAFON Rp. 28,391,747.50

D PEKERJAAN PASANGAN KERAMIK Rp. 37,636,573.42


E PEKERJAAN PINTU DAN JENDELA Rp. 13,839,596.44
F SANITAIR & PLUMBING Rp. 11,535,942.50
G ELEKTRIKAL Rp. 6,397,875.00
H PENGECATAN DAN PASANGAN Rp. 25,165,300.00
I PEMBUATAN PENGOLAHAN LIMBAH Rp. 4,820,277.25

JUMLAH Rp. 181,769,998.09


Pajak PPn PPh Rp. 18,176,999.81
TOTAL Rp. 199,946,997.89
DIBULATKAN Rp. 199,946,000.00

Terbilang :
Seratus Sembilan Puluh Sembilan Juta Sembilan Ratus Empat Puluh Enam Ribu Rupiah
181,819,089.24 49,091.15
18,181,908.92 0.0909095446
200,000,000.00
200,000,000.00
ENGINEERING ESTIMATE

PEKERJAAN : PENGEMBANGAN LABORATORIUM KIMIA


LOKASI : KAMPUS POLITEKNIK NEGERI LAMPUNG
TAHUN ANGGARA: 2019

HARGA
No URAIAN PEKERJAAN ANALISA VOLUME SATUAN
(Rp.)
A PERSIAPAN
1 Pekerjaan Bongkaran (Lantai,Pintu, Dindin - 1.00 Ls ###
2 Dokumentasi - 1.00 Ls 500,000.00
3 Laporan - 1.00 Ls 500,000.00
PERSIAPAN
B PEKERJAAN TANAH,PASANGAN Dan DINDING
1 Galian Tanah Pondasi A.2.3.1.3. 0.94 m3 101,612.50
2 Urugan Pasir Bawah Pondasi Batu A.4.4.2.4. 0.09 m3 347,875.00
3 Pasangan Batu Pondasi A.3.2.1.2. 1.87 749,001.00
4 Timbunan Tanah Lantai A.2.3.1.9. 1.87 m3 50,875.00
5 Sloof 12.12
Beton adk 1:3:5 A.4.1.1.4 0.21 m3 964,660.53
Pembesian A.4.1.1.17 61.78 kg 16,346.00
Bekisting A.4.1.1.21 4.50 m2 242,962.50
6 Kolom Praktis 12x12
Beton adk 1:3:5 A.4.1.1.5 0.40 m3 ###
Pembesian A.4.1.1.17 120.96 kg 16,346.00
Bekisting A.4.1.1.22 8.40 m2 404,030.00
7 Pas. Bata 1/2 adk 1:4 A.4.4.1.9 88.00 m2 113,839.00
8 Ringbalk 10.15
Beton adk 1:3:5 A.4.1.1.5 0.55 m3 ###
Pembesian A.4.1.1.17 164.70 kg 16,346.00
Bekisting A.4.1.1.23 14.64 m2 415,844.00
9 Plesteran + Acian A.4.4.2.4. 176.00 m2 71,950.00
10 Meja Beton (kitchen sink)
Beton adk 1:3:5 A.4.1.1.5 0.48 m3 ###
Pembesian A.4.1.1.17 144.00 kg 16,346.00
Bekisting A.4.1.1.26 4.80 m2 368,197.50

EE-Halaman-3
HARGA
No URAIAN PEKERJAAN ANALISA VOLUME SATUAN
(Rp.)
PEKERJAAN TANAH,PASANGAN Dan DINDING
C PEKERJAAN ATAP DAN PLAFON
1 Pasang atap Spandek - 72.95 m2 165,000.00
3 Pasang Atap Teras depan - 26.10 m2 165,000.00
4 Pasang Plafon Gipsum Supl A.4.5.1.5. 70.20 m2 154,779.17
5 Pasang List Plafon Gipsum Supl A.4.5.1.9. 33.80 M' 35,000.00
PEKERJAAN ATAP DAN PLAFON
D PEKERJAAN PASANGAN KERAMIK
1 Urugan Pasir Bawah Keramik A.2.3.1.11 6.21 M3 347,875.00
2 Pasangan Keramik Lantai Kasar 50x50 Supl A.4.4.3.12 62.10 m2 282,727.50
3 Pasangan Plin Keramik 10 x 50 A.4.1.1.17 33.80 M' 43,541.30
4 Pasang Keramik Meja Beton A.4.1.1.5 4.80 m3 ###
5 Pasang Keramik Dinding Kamar mandi 50 - 7.80 M2 234,547.50
6 Pasang Keramik Lantai 25x25 cm - 2.25 M2 338,470.00
7 Floor Lantai Teras A.4.1.1.5 2.60 m3 ###
8 Pasang Paping Blok Depan Teras Supl A.4.4.3.65 27.50 281,334.35
PEKERJAAN PASANGAN KERAMIK

E PEKERJAAN PINTU DAN JENDELA


2 Pek. Pintu P2 (1 Unit) Supl A.4.2.1.13b 1.00 Unit ###
3 Pek. Pasang Pintu P3 (1 Unit) - 1.00 Unit 500,000.00
4 Pek. Jendela J1 (4 Unit) Supl A.4.2.1.13g 4.00 Unit ###
5 Pek. Bouven BV (2 Unit) Supl A.4.2.1.13i 2.00 Unit 378,308.29
PEKERJAAN PINTU DAN JENDELA

EE-Halaman-4
HARGA
No URAIAN PEKERJAAN ANALISA VOLUME SATUAN
(Rp.)
F SANITAIR & PLUMBING
1 Pas. Kitchensink 2.00 bh 500,000.00
2 Pas. Kloset Jongkok A.5.1.1.2. 1.00 bh 691,350.00
3 Pas. Floor Drain 4" Stainlees Steel A.5.1.1.14. 1.00 bh 178,942.50
4 Pas. Kran Dinding 1/2" (Standar) A.5.1.1.19. 3.00 bh 78,567.50
5 Pas. Septick Tank - 1.00 set ###
6 Pas. Resapan - 1.00 set ###
7 Pipa Air Bersih PVC tipe AW Ø 1/2" A.5.1.1.25. 4.00 m 20,669.00
8 Pipa Air Bersih PVC tipe AW Ø ¾" A.5.1.1.26. 12.00 m 23,564.75
10 Pipa PVC tipe AW Ø 2" A.5.1.1.29. 24.00 m 54,169.50
11 Pipa Air Bekas PVC tipe AW Ø 4" A.5.1.1.32. 6.00 m 153,579.25
12 Pipa Air Kotor PVC tipe AW Ø 4" A.5.1.1.32. 12.00 m 153,579.25
SANITAIR & PLUMBING
G ELEKTRIKAL
1 Pas Lampu Down Light 3" (R Kelas) Supl A.8.4.3.16b 9.00 bh 79,530.00
2 Pas Lampu Down Light 3" (KM/WC) Supl A.8.4.3.16b 1.00 bh 79,530.00
3 Pas Stop Kontak Supl A.8.4.3.16e 4.00 bh 90,420.00
4 Pas Saklar Double Supl A.8.4.3.16g 5.00 bh 92,840.00
5 Pas Instalasi Listrik Supl A.8.4.3.16h 19.00 bh 251,405.00
ELEKTRIKAL

EE-Halaman-5
JUMLAH (Rp.)

6,500,000.00
500,000.00
500,000.00
7,500,000.00

95,109.30
32,561.10
1,402,129.87
95,238.00

198,642.90
1,009,790.50
1,093,331.25

451,135.96
1,977,212.16
3,393,852.00
10,017,832.00

614,269.95
2,692,186.20
6,087,956.16
12,663,200.00

537,066.62
2,353,824.00
1,767,348.00

EE-Halaman-6
JUMLAH (Rp.)

46,482,685.97

12,036,750.00
4,306,500.00
10,865,497.50
1,183,000.00
28,391,747.50

2,160,303.75
17,557,377.75
1,471,695.94
5,370,666.23
1,829,470.50
761,557.50
2,909,110.88
7,736,694.63
37,636,573.42

1,847,934.50
500,000.00
10,735,045.37
756,616.58
13,839,596.44

EE-Halaman-7
JUMLAH (Rp.)

1,000,000.00
691,350.00
178,942.50
235,702.50
3,000,000.00
2,000,000.00
82,676.00
282,777.00
1,300,068.00
921,475.50
1,842,951.00
11,535,942.50

715,770.00
79,530.00
361,680.00
464,200.00
4,776,695.00
6,397,875.00

EE-Halaman-8
A.2.3.1 HARGA SATUAN PEKERJAAN (HSP) TANAH
A.2.3.1.3. A.2.3.1.3. Menggali 1 m3 tanah biasa sampai dengan sedalam 3 m
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.050 80,000.00 84,000.00
Mandor OH 0.067 125,000.00 8,375.00
Jumlah A 92,375.00
B BAHAN
- 0.00
- 0.00
Jumlah B 0.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 92,375.00
E Overhead & Profit (10 %) 9,237.50
F Harga Satuan Pekerjaan (D+E) 101,612.50

Supl A.2.3.1.10 A.2.3.1.10. Pengurugan 1 m3 dengan tanah pilihan (dipadatkan per 20 cm)
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.000 80,000.00 80,000.00
Mandor OH 0.050 125,000.00 6,250.00
Jumlah A 86,250.00
B BAHAN
Tanah Urug m3 1.200 75,000.00 90,000.00
- 0.00
Jumlah B 90,000.00
C PERALATAN
Stamper jam 0.250 55,988.00 13,997.00
- 0.00
Jumlah C 13,997.00
D Jumlah (A+B+C) 190,247.00
E Overhead & Profit (10 %) 19,024.70
F Harga Satuan Pekerjaan (D+E) 209,271.70

HSP-Halaman-9
A.2.3.1.11 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.300 80,000.00 24,000.00
Mandor OH 0.010 125,000.00 1,250.00
Jumlah A 25,250.00
B BAHAN
Pasir Urug m3 1.200 242,500.00 291,000.00
- 0.00
Jumlah B 291,000.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 316,250.00
E Overhead & Profit (10 %) 31,625.00
F Harga Satuan Pekerjaan (D+E) 347,875.00

A.3.2.1 HARGA SATUAN PEKERJAAN (HSP) PONDASI


A.3.2.1.2. A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.500 80,000.00 120,000.00
Tukang Batu OH 0.750 100,000.00 75,000.00
Kepala Tukang OH 0.075 125,000.00 9,375.00
Mandor OH 0.075 125,000.00 9,375.00
Jumlah A 213,750.00
B BAHAN
Batu Belah m3 1.200 278,800.00 334,560.00
Semen Portland kg 163.000 1,200.00
Pasir Pasang m3 0.520 255,000.00 132,600.00
Jumlah B 467,160.00
C PERALATAN
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 680,910.00
E Overhead & Profit (10 %) 68,091.00
F Harga Satuan Pekerjaan (D+E) 749,001.00

HSP-Halaman-10
A.4.1.1 HARGA SATUAN PEKERJAAN (HSP) BETON
A.4.1.1.4 A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K-100) slump (3-6) cm, w/c = 0,87
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.200 80,000.00 96,000.00
Tukang Batu OH 0.200 100,000.00 20,000.00
Kepala Tukang OH 0.020 125,000.00 2,500.00
Mandor OH 0.060 125,000.00 7,500.00
Jumlah A 126,000.00
B BAHAN
Semen kg 230.000 1,200.00 276,000.00
Pasir Beton m3 0.638 257,200.00 164,056.86
Kerikil (Maks 30 mm) m3 0.761 382,400.00 290,907.26
Air Ltr 200.000 100.00 20,000.00
Jumlah B 750,964.12
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 876,964.12
E Overhead & Profit (10 %) 87,696.41
F Harga Satuan Pekerjaan (D+E) 964,660.53

A.4.1.1.8 A.4.1.1.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K-250) slump (12±2) cm, w/c = 0,56
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.650 80,000.00 132,000.00
Tukang Batu OH 0.275 100,000.00 27,500.00
Kepala Tukang OH 0.028 125,000.00 3,500.00
Mandor OH 0.083 125,000.00 10,375.00
Jumlah A 173,375.00
B BAHAN
Semen kg 384.000 1,200.00 460,800.00
Pasir Beton m3 0.494 257,200.00 127,130.29
Kerikil (Maks 30 mm) m3 0.770 382,400.00 294,306.37
Air Ltr 215.000 100.00 21,500.00
Jumlah B 903,736.66
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 1,077,111.66
E Overhead & Profit (10 %) 107,711.17
F Harga Satuan Pekerjaan (D+E) 1,184,822.82

HSP-Halaman-11
A.4.1.1.17 A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.070 80,000.00 5,600.00
Tukang Besi OH 0.070 100,000.00 7,000.00
Kepala Tukang OH 0.007 125,000.00 875.00
Mandor OH 0.004 125,000.00 500.00
Jumlah A 13,975.00
B BAHAN
Besi kg 10.500 12,500.00 131,250.00
Kawat Beton kg 0.150 22,500.00 3,375.00
Jumlah B 134,625.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 148,600.00
E Overhead & Profit (10 %) 14,860.00
F Harga Satuan Pekerjaan (D+E) 163,460.00
Pembesian 1 kg dengan besi polos atau besi ulir 16,346.00

A.4.1.1.21 A.4.1.1.21 Pemasangan 1 m2 bekisting untuk Sloof


No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.520 80,000.00 41,600.00
Tukang Kayu OH 0.260 100,000.00 26,000.00
Kepala Tukang OH 0.026 125,000.00 3,250.00
Mandor OH 0.026 125,000.00 3,250.00
Jumlah A 74,100.00
B BAHAN
Kayu Kls III m3 0.045 3,085,000.00 138,825.00
Paku 5 - 10 cm kg 0.300 15,000.00 4,500.00
Minyak Bekisting Ltr 0.100 34,500.00 3,450.00
Jumlah B 146,775.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 220,875.00
E Overhead & Profit (10 %) 22,087.50
F Harga Satuan Pekerjaan (D+E) 242,962.50

HSP-Halaman-12
Supl A.4.2.1.13a A.4.2.1.13a Pemasangan pintu taekwood rangka alluminium (P1)
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
Kusen / m'
A TENAGA
Pekerja OH 0.043 80,000.00 3,440.00
Tukang Besi OH 0.043 100,000.00 4,300.00
Kepala Tukang OH 0.004 125,000.00 537.50
Mandor OH 0.002 125,000.00 262.50
Jumlah A 8,540.00
B BAHAN
Profil alluminium 4 " m 1.100 105,000.00 115,500.00
warna hitam
Skrup fixer bh 2.000 1,000.00 2,000.00
Sealant Tube 0.060 27,500.00 1,650.00
0.00
Jumlah B 119,150.00
C PERALATAN
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 127,690.00
E Overhead & Profit (10 %) 12,769.00
F Harga Satuan Pekerjaan (D+E) 140,459.00
Alumunium untuk Kusen P2 (m) 7.50
Kusen P1 1,053,442.50
Jalusi Kaca Mati / m2
A TENAGA
Pekerja OH 0.015 80,000.00 1,200.00
Tukang OH 0.150 100,000.00 15,000.00
Kepala Tukang OH 0.015 125,000.00 1,875.00
Mandor OH 0.001 125,000.00 93.75
Jumlah A 18,168.75
B BAHAN
Kaca Rayband 5 mm m2 1.100 97,000.00 106,700.00
0.00
Jumlah B 106,700.00
C PERALATAN
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 124,868.75
E Overhead & Profit (10 %) 12,486.88
F Harga Satuan Pekerjaan (D+E) 137,355.63
Jalusi Kaca Mati P1 (m2) 0.50
Jalusi Kaca Mati P1 68,677.81

HSP-Halaman-13
Pintu Taekwood Lengkap / m2
A TENAGA
Pekerja OH 0.750 80,000.00 60,000.00
Tukang OH 1.000 100,000.00 100,000.00
Kepala Tukang OH 0.200 125,000.00 25,000.00
Mandor OH 0.020 125,000.00 2,500.00
Jumlah A 187,500.00
B BAHAN
Kayu Kls.II (papan) M3 0.025 4,125,000.00 103,125.00
Formika Lbr 0.350 320,000.00 112,000.00
Teakwood Lbr 0.700 95,000.00 66,500.00
Lem aibond Kg 0.500 35,000.00 17,500.00
Paku Kg 0.030 15,000.00 450.00
Lem putih Kg 0.500 18,000.00 9,000.00
0.00
Jumlah B 308,575.00
C PERALATAN
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 496,075.00
E Overhead & Profit (10 %) 49,607.50
F Harga Satuan Pekerjaan (D+E) 545,682.50
Daun Pintu Taekwood P2 (m2) 2.05
Daun Pintu Taekwood P1 1,118,649.13

pintu taekwood rangka alluminium (P1)


Kusen P1 1,053,442.50
Jalusi Kaca Mati P1 68,677.81
Daun Pintu Taekwood P1 1,118,649.13
Engsel 3 bh 40,000.00 120,000.00
Grendel 1 bh 50,000.00 50,000.00
Kunci 2 Slaag + handel 1 set 250,000.00 250,000.00
pintu taekwood 2,660,769.44
rangka alluminium (P1)

HSP-Halaman-14
Supl A.4.2.1.13b A.4.2.1.13b Pemasangan pintu kaca es rangka alluminium (P2) untuk KM/WC
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
Kusen / m'
A TENAGA
Pekerja OH 0.043 80,000.00 3,440.00
Tukang Besi OH 0.043 100,000.00 4,300.00
Kepala Tukang OH 0.004 125,000.00 537.50
Mandor OH 0.002 125,000.00 262.50
Jumlah A 8,540.00
B BAHAN
Profil alluminium 4 " m 1.100 105,000.00 115,500.00
warna hitam
Skrup fixer bh 2.000 1,000.00 2,000.00
Sealant Tube 0.060 27,500.00 1,650.00
0.00
Jumlah B 119,150.00
C PERALATAN
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 127,690.00
E Overhead & Profit (10 %) 12,769.00
F Harga Satuan Pekerjaan (D+E) 140,459.00
Alumunium untuk Kusen P3 (m) 5.00
Kusen P2 702,295.00
Kaca Es / m2
A TENAGA
Pekerja OH 0.015 80,000.00 1,200.00
Tukang OH 0.150 100,000.00 15,000.00
Kepala Tukang OH 0.015 125,000.00 1,875.00
Mandor OH 0.001 125,000.00 93.75
Jumlah A 18,168.75
B BAHAN
Kaca Es m2 1.100 100,000.00 110,000.00
0.00
Jumlah B 110,000.00
C PERALATAN
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 128,168.75
E Overhead & Profit (10 %) 12,816.88
F Harga Satuan Pekerjaan (D+E) 140,985.63
Kaca Es P3 (m2) 0.93
Kaca Es P2 130,482.20

HSP-Halaman-15
Rangka Pintu Kaca Es
A TENAGA
Pekerja OH 0.043 80,000.00 3,440.00
Tukang OH 0.043 100,000.00 4,300.00
Kepala Tukang OH 0.004 125,000.00 537.50
Mandor OH 0.002 125,000.00 262.50
Jumlah A 8,540.00
B BAHAN
Profil alluminium 4 " m 1.100 105,000.00 115,500.00
warna hitam
Skrup fixer bh 2.000 1,000.00 2,000.00
Sealant Tube 0.060 27,500.00 1,650.00
0.00
Jumlah B 119,150.00
C PERALATAN
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 127,690.00
E Overhead & Profit (10 %) 12,769.00
F Harga Satuan Pekerjaan (D+E) 140,459.00
Rangka Pintu Kaca Es (m2) 4.70
Rangka Pintu Kaca Es 660,157.30
pintu kaca es rangka alluminium (P3) untuk KM/WC
Kusen P2 702,295.00
Kaca Es P2 130,482.20
Rangka Pintu Kaca Es 660,157.30
Engsel 2 bh 40,000.00 80,000.00
Grendel 1 bh 25,000.00 25,000.00
Kunci 2 Slaag + handel 1 set 250,000.00 250,000.00
pintu kaca es rangka 1,847,934.50
alluminium (P3) untuk
KM/WC

HSP-Halaman-16
Supl A.4.2.1.13g A.4.2.1.13g Pemasangan Jendela Alumunium + Kaca (J1)
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
Kusen / m'
A TENAGA
Pekerja OH 0.043 80,000.00 3,440.00
Tukang Besi OH 0.043 100,000.00 4,300.00
Kepala Tukang OH 0.004 125,000.00 537.50
Mandor OH 0.002 125,000.00 262.50
Jumlah A 8,540.00
B BAHAN
Profil alluminium 4 " m 1.100 105,000.00 115,500.00
warna hitam
Skrup fixer bh 2.000 1,000.00 2,000.00
Sealant Tube 0.060 27,500.00 1,650.00
Jumlah B 119,150.00
C PERALATAN
Jumlah C 0.00
D Jumlah (A+B+C) 127,690.00
E Overhead & Profit (10 %) 12,769.00
F Harga Satuan Pekerjaan (D+E) 140,459.00
Alumunium untuk Kusen J1 (m) 9.30
Kusen J1 1,306,268.70
Pasangan Kaca Mati / m2
A TENAGA
Pekerja OH 0.015 80,000.00 1,200.00
Tukang OH 0.150 100,000.00 15,000.00
Kepala Tukang OH 0.015 125,000.00 1,875.00
Mandor OH 0.001 125,000.00 93.75
Jumlah A 18,168.75
B BAHAN
Kaca Rayband 5 mm m2 1.100 97,000.00 106,700.00
0.00
Jumlah B 106,700.00
C PERALATAN
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 124,868.75
E Overhead & Profit (10 %) 12,486.88
F Harga Satuan Pekerjaan (D+E) 137,355.63
Kaca Mati J1 (m2) 0.50
Kaca Mati J1 (m2) 68,677.81

HSP-Halaman-17
Daun Jendela
A TENAGA
Pekerja OH 0.333 80,000.00 26,668.80
Tukang OH 0.547 100,000.00 54,720.00
Kepala Tukang OH 0.055 125,000.00 6,840.00
Mandor OH 0.016 125,000.00 2,038.50
Jumlah A 90,267.30
B BAHAN
Profil alluminium 4 " m 7.200 105,000.00 756,000.00
warna hitam
Skrup fixer bh 14.400 1,000.00 14,400.00
Sealant Tube 0.432 27,500.00 11,880.00
Kaca Rayband 5 mm m2 1.584 97,000.00 153,648.00
0.00
Jumlah B 935,928.00
C PERALATAN
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 1,026,195.30
E Overhead & Profit (10 %) 102,619.53
F Harga Satuan Pekerjaan (D+E) 1,128,814.83
Pemasangan Jendela Alumunium + Kaca (J1)
Kusen J1 1,306,268.70
Kaca Mati J1 (m2) 68,677.81
Daun Jendela 1,128,814.83
Engsel 4 bh 20,000.00 80,000.00
Grendel 2 bh 25,000.00 50,000.00
Hak Angin 2 bh 25,000.00 50,000.00
2,683,761.34

HSP-Halaman-18
Supl A.4.2.1.13i A.4.2.1.13i Pemasangan Bouven Alumunium + Kaca (BV)
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
Kusen / m'
A TENAGA
Pekerja OH 0.043 80,000.00 3,440.00
Tukang Besi OH 0.043 100,000.00 4,300.00
Kepala Tukang OH 0.004 125,000.00 537.50
Mandor OH 0.002 125,000.00 262.50
Jumlah A 8,540.00
B BAHAN
Profil alluminium 4 " m 1.100 105,000.00 115,500.00
warna hitam
Skrup fixer bh 2.000 1,000.00 2,000.00
Sealant Tube 0.060 27,500.00 1,650.00
0.00
Jumlah B 119,150.00
C PERALATAN
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 127,690.00
E Overhead & Profit (10 %) 12,769.00
F Harga Satuan Pekerjaan (D+E) 140,459.00
Alumunium untuk Kusen BV2 (m) 2.40
Kusen BV 337,101.60
Pasangan Kaca Mati / m2
A TENAGA
Pekerja OH 0.015 80,000.00 1,200.00
Tukang OH 0.150 100,000.00 15,000.00
Kepala Tukang OH 0.015 125,000.00 1,875.00
Mandor OH 0.001 125,000.00 93.75
Jumlah A 18,168.75
B BAHAN
Kaca Rayband 5 mm m2 1.100 97,000.00 106,700.00
0.00
Jumlah B 106,700.00
C PERALATAN
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 124,868.75
E Overhead & Profit (10 %) 12,486.88
F Harga Satuan Pekerjaan (D+E) 137,355.63
Kaca Mati BV (m2) 0.30
Kaca Mati BV 41,206.69
Pemasangan Bouven Alumunium + Kaca (BV)
Kusen BV 337,101.60
Kaca Mati BV 41,206.69
378,308.29

HSP-Halaman-19
A.4.4.1 HARGA SATUAN PEKERJAAN DINDING
A.4.4.1.3 A.4.4.1.3 Pemasangan 1 m2 dinding bata merah (bata bolong) cm tebal 1 batu campuran 1SP : 4PP
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.600 80,000.00 48,000.00
Tukang Batu OH 0.200 100,000.00 20,000.00
Kepala Tukang OH 0.020 125,000.00 2,500.00
Mandor OH 0.030 125,000.00 3,750.00
Jumlah A 74,250.00
B BAHAN
Bata Merah buah 128.000 650.00 83,200.00
Semen Portland kg 26.550 1,200.00 31,860.00
Pasir Pasang m3 0.093 255,000.00 23,715.00
Jumlah B 138,775.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 213,025.00
E Overhead & Profit (10 %) 21,302.50
F Harga Satuan Pekerjaan (D+E) 234,327.50

A.4.4.1.9 A.4.4.1.9 Pemasangan 1 m2 dinding bata merah (bata bolong) cm tebal 1/2 batu campuran 1SP : 4PP
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.300 80,000.00 24,000.00
Tukang Batu OH 0.100 100,000.00 10,000.00
Kepala Tukang OH 0.010 125,000.00 1,250.00
Mandor OH 0.015 125,000.00 1,875.00
Jumlah A 37,125.00
B BAHAN
Bata Merah buah 64.000 650.00 41,600.00
Semen Portland kg 11.500 1,200.00 13,800.00
Pasir Pasang m3 0.043 255,000.00 10,965.00
Jumlah B 66,365.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 103,490.00
E Overhead & Profit (10 %) 10,349.00
F Harga Satuan Pekerjaan (D+E) 113,839.00

HSP-Halaman-20
A.4.4.2.4. A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.300 80,000.00 24,000.00
Tukang Batu OH 0.150 100,000.00 15,000.00
Kepala Tukang OH 0.015 125,000.00 1,875.00
Mandor OH 0.015 125,000.00 1,875.00
Jumlah A 42,750.00
B BAHAN
Semen Portland kg 6.240 1,200.00 7,488.00
Pasir Pasang m3 0.024 255,000.00 6,120.00
Jumlah B 13,608.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 56,358.00
E Overhead & Profit (10 %) 5,635.80
F Harga Satuan Pekerjaan (D+E) 61,993.80

A.4.4.3.13 A.4.4.3.13. Pemasangan 1 m2 lantai granit ukuran 60 cm x 60 cm


No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.240 80,000.00 19,200.00
Tukang Batu OH 0.120 100,000.00 12,000.00
Kepala Tukang OH 0.012 125,000.00 1,500.00
Mandor OH 0.012 125,000.00 1,500.00
Jumlah A 34,200.00
B BAHAN
Ubin Granit 60x60 bh 3.100 87,500.00 271,250.00
Semen Portland kg 9.600 1,200.00 11,520.00
Semen Warna kg 1.500 25,000.00 37,500.00
Pasir Pasang m3 0.045 255,000.00 11,475.00
Jumlah B 331,745.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 365,945.00
E Overhead & Profit (10 %) 36,594.50
F Harga Satuan Pekerjaan (D+E) 402,539.50

Supl A.4.4.3.12 A.4.4.3.12. Pemasangan 1 m2 lantai keramik ukuran 50 cm x 50 cm


No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.260 80,000.00 20,800.00
Tukang Batu OH 0.130 100,000.00 13,000.00
Kepala Tukang OH 0.013 125,000.00 1,625.00

HSP-Halaman-21
Mandor OH 0.013 125,000.00 1,625.00
Jumlah A 37,050.00
B BAHAN
Keramik 50 x50 m2 1.200 132,500.00 159,000.00
Semen Portland kg 10.000 1,200.00 12,000.00
Semen Warna kg 1.500 25,000.00 37,500.00
Pasir Pasang m3 0.045 255,000.00 11,475.00
Jumlah B 219,975.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 257,025.00
E Overhead & Profit (10 %) 25,702.50
F Harga Satuan Pekerjaan (D+E) 282,727.50

HSP-Halaman-22
Supl A.4.4.3.28 A.4.4.3.28. Pemasangan 1 m’ plint granit ukuran 10 cm x 60 cm
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.090 80,000.00 7,200.00
Tukang Batu OH 0.090 100,000.00 9,000.00
Kepala Tukang OH 0.009 125,000.00 1,125.00
Mandor OH 0.005 125,000.00 625.00
Jumlah A 17,950.00
B BAHAN
Plint Granit 10x60 bh 1.700 10,000.00 17,000.00
Semen Portland kg 1.140 1,200.00 1,368.00
Semen Warna kg 0.100 25,000.00 2,500.00
Pasir Pasang m3 0.003 255,000.00 765.00
Jumlah B 21,633.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 39,583.00
E Overhead & Profit (10 %) 3,958.30
F Harga Satuan Pekerjaan (D+E) 43,541.30

Supl A.4.4.3.54 A.4.4.3.54.Pemasangan 1 m2 dinding keramik 30 cm x 60 cm


No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.900 80,000.00 72,000.00
Tukang Batu OH 0.450 100,000.00 45,000.00
Kepala Tukang OH 0.045 125,000.00 5,625.00
Mandor OH 0.045 125,000.00 5,625.00
Jumlah A 128,250.00
B BAHAN
Keramik 30 x 60 m2 1.200 135,000.00 162,000.00
Semen Portland kg 9.300 1,200.00 11,160.00
Semen Warna kg 1.940 25,000.00 48,500.00
Pasir Pasang m3 0.018 255,000.00 4,590.00
Jumlah B 226,250.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 354,500.00
E Overhead & Profit (10 %) 35,450.00
F Harga Satuan Pekerjaan (D+E) 389,950.00

Supl A.4.5.1.5b A.4.5.1.5b.Pemasangan 1 m2 langit-langit (plafond) Gypsum


No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.400 80,000.00 32,000.00

HSP-Halaman-23
Tukang OH 0.600 100,000.00 60,000.00
Kepala Tukang OH 0.040 125,000.00 5,000.00
Mandor OH 0.040 125,000.00 5,000.00
Jumlah A 102,000.00
B BAHAN
Hollow Galvanis m 2.750 3,666.67 10,083.33
40.40.0,7
Gypsum Board t = 9 mm lbr 0.350 73,000.00 25,550.00

Compound Gypsum kg 0.125 3,000.00 375.00


Joint Tape m 2.000 250.00 500.00
Paku Gypsum kg 0.110 20,000.00 2,200.00
Jumlah B 38,708.33
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 140,708.33
E Overhead & Profit (10 %) 14,070.83
F Harga Satuan Pekerjaan (D+E) 154,779.17

HSP-Halaman-24
Supl A.4.5.1.5c A.4.5.1.5c.Pemasangan 1 m2 Partisi Gypsum
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.400 80,000.00 32,000.00
Tukang OH 0.600 100,000.00 60,000.00
Kepala Tukang OH 0.040 125,000.00 5,000.00
Mandor OH 0.040 125,000.00 5,000.00
Jumlah A 102,000.00
B BAHAN
Hollow Galvanis m 4.125 3,666.67 15,125.00
40.40.0,7
Gypsum Board t = 9 mm lbr 0.700 73,000.00 51,100.00

Compound Gypsum kg 0.250 3,000.00 750.00


Joint Tape m 4.000 250.00 1,000.00
Paku Gypsum kg 0.220 20,000.00 4,400.00
Jumlah B 72,375.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 174,375.00
E Overhead & Profit (10 %) 17,437.50
F Harga Satuan Pekerjaan (D+E) 191,812.50

A.5.1.1.2. A.5.1.1.2. Pemasangan 1 buah closet jongkok


No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.000 80,000.00 80,000.00
Tukang Batu OH 1.500 100,000.00 150,000.00
Kepala Tukang OH 0.150 125,000.00 18,750.00
Mandor OH 0.160 125,000.00 20,000.00
Jumlah A 268,750.00
B BAHAN
Closet Jongkok bh 1.000 350,000.00 350,000.00
Semen PC kg 6.000 1,200.00 7,200.00
Pasir Pasang m3 0.010 255,000.00 2,550.00
Jumlah B 359,750.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 628,500.00
E Overhead & Profit (10 %) 62,850.00
F Harga Satuan Pekerjaan (D+E) 691,350.00

HSP-Halaman-25
A.5.1.1.14. A.5.1.1.14. Pemasangan 1 buah floor drain
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.010 80,000.00 800.00
Tukang Batu OH 0.100 100,000.00 10,000.00
Kepala Tukang OH 0.010 125,000.00 1,250.00
Mandor OH 0.005 125,000.00 625.00
Jumlah A 12,675.00
B BAHAN
Floor Drain bh 1.000 150,000.00 150,000.00
Jumlah B 150,000.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 162,675.00
E Overhead & Profit (10 %) 16,267.50
F Harga Satuan Pekerjaan (D+E) 178,942.50

A.5.1.1.19. A.5.1.1.19. Pemasangan 1 buah kran air


No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.010 80,000.00 800.00
Tukang Batu OH 0.400 100,000.00 40,000.00
Kepala Tukang OH 0.040 125,000.00 5,000.00
Mandor OH 0.005 125,000.00 625.00
Jumlah A 46,425.00
B BAHAN
Kran Air bh 1.000 25,000.00 25,000.00
Jumlah B 25,000.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 71,425.00
E Overhead & Profit (10 %) 7,142.50
F Harga Satuan Pekerjaan (D+E) 78,567.50

HSP-Halaman-26
A.5.1.1.25. A.5.1.1.25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2 ”
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.036 80,000.00 2,880.00
Tukang Batu OH 0.060 100,000.00 6,000.00
Kepala Tukang OH 0.006 125,000.00 750.00
Mandor OH 0.002 125,000.00 250.00
Jumlah A 9,880.00
B BAHAN
Pipa PVC 1/2" m 1.200 5,500.00 6,600.00
Perlengkapan (35%) % 35.000 6,600.00 2,310.00
Jumlah B 8,910.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 18,790.00
E Overhead & Profit (10 %) 1,879.00
F Harga Satuan Pekerjaan (D+E) 20,669.00

A.5.1.1.26. A.5.1.1.26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ”


No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.036 80,000.00 2,880.00
Tukang Batu OH 0.060 100,000.00 6,000.00
Kepala Tukang OH 0.006 125,000.00 750.00
Mandor OH 0.002 125,000.00 250.00
Jumlah A 9,880.00
B BAHAN
Pipa PVC 3/4" m 1.200 7,125.00 8,550.00
Perlengkapan (35%) % 35.000 8,550.00 2,992.50
Jumlah B 11,542.50
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 21,422.50
E Overhead & Profit (10 %) 2,142.25
F Harga Satuan Pekerjaan (D+E) 23,564.75

HSP-Halaman-27
A.5.1.1.27. A.5.1.1.27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ”
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.036 80,000.00 2,880.00
Tukang Batu OH 0.060 100,000.00 6,000.00
Kepala Tukang OH 0.006 125,000.00 750.00
Mandor OH 0.002 125,000.00 250.00
Jumlah A 9,880.00
B BAHAN
Pipa PVC 1" m 1.200 21,000.00 25,200.00
Perlengkapan (35%) % 35.000 25,200.00 8,820.00
Jumlah B 34,020.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 43,900.00
E Overhead & Profit (10 %) 4,390.00
F Harga Satuan Pekerjaan (D+E) 48,290.00

A.5.1.1.29. A.5.1.1.29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 ”


No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.054 80,000.00 4,320.00
Tukang Batu OH 0.090 100,000.00 9,000.00
Kepala Tukang OH 0.009 125,000.00 1,125.00
Mandor OH 0.003 125,000.00 375.00
Jumlah A 14,820.00
B BAHAN
Pipa PVC 2" m 1.200 21,250.00 25,500.00
Perlengkapan (35%) % 35.000 25,500.00 8,925.00
Jumlah B 34,425.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 49,245.00
E Overhead & Profit (10 %) 4,924.50
F Harga Satuan Pekerjaan (D+E) 54,169.50

HSP-Halaman-28
A.5.1.1.32. A.5.1.1.32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4 ”
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.081 80,000.00 6,480.00
Tukang Batu OH 0.135 100,000.00 13,500.00
Kepala Tukang OH 0.014 125,000.00 1,687.50
Mandor OH 0.004 125,000.00 500.00
Jumlah A 22,167.50
B BAHAN
Pipa PVC 4" m 1.200 72,500.00 87,000.00
Perlengkapan (35%) % 35.000 87,000.00 30,450.00
Jumlah B 117,450.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 139,617.50
E Overhead & Profit (10 %) 13,961.75
F Harga Satuan Pekerjaan (D+E) 153,579.25

Supl A.8.4.3.16b A.8.4.3.16b. Pemasangan Lampu Down Light 3"


No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Asisten Instalatir OH 0.160 80,000.00 12,800.00
Instalatir Listrik OH 0.320 100,000.00 32,000.00
Jumlah A 44,800.00
B BAHAN
Lampu Down Light 3" bh 1.000 25,000.00 25,000.00
Perlengkapan 10 % 2,500.00
Jumlah B 27,500.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 72,300.00
E Overhead & Profit (10 %) 7,230.00
F Harga Satuan Pekerjaan (D+E) 79,530.00

HSP-Halaman-29
Supl A.8.4.3.16e A.8.4.3.16e. Pemasangan Stop Kontak
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Asisten Instalatir OH 0.160 80,000.00 12,800.00
Instalatir Listrik OH 0.320 100,000.00 32,000.00
Jumlah A 44,800.00
B BAHAN
Stop Kontak bh 1.000 34,000.00 34,000.00
Perlengkapan 10 % 3,400.00
Jumlah B 37,400.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 82,200.00
E Overhead & Profit (10 %) 8,220.00
F Harga Satuan Pekerjaan (D+E) 90,420.00

Supl A.8.4.3.16f A.8.4.3.16f. Pemasangan Stop Kontak AC


No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Asisten Instalatir OH 0.160 80,000.00 12,800.00
Instalatir Listrik OH 0.320 100,000.00 32,000.00
Jumlah A 44,800.00
B BAHAN
Stop Kontak AC bh 1.000 75,000.00 75,000.00
Perlengkapan 10 % 7,500.00
Jumlah B 82,500.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 127,300.00
E Overhead & Profit (10 %) 12,730.00
F Harga Satuan Pekerjaan (D+E) 140,030.00

HSP-Halaman-30
Supl A.8.4.3.16g A.8.4.3.16g. Pemasangan Saklar Double
No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Asisten Instalatir OH 0.160 80,000.00 12,800.00
Instalatir Listrik OH 0.320 100,000.00 32,000.00
Jumlah A 44,800.00
B BAHAN
Saklar Double bh 1.000 36,000.00 36,000.00
Perlengkapan 10 % 3,600.00
Jumlah B 39,600.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 84,400.00
E Overhead & Profit (10 %) 8,440.00
F Harga Satuan Pekerjaan (D+E) 92,840.00

Supl A.8.4.3.16h A.8.4.3.16h. Pemasangan Instalasi Listrik


No Uraian Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Asisten Instalatir OH 0.160 80,000.00 12,800.00
Instalatir Listrik OH 0.320 100,000.00 32,000.00
Jumlah A 44,800.00
B BAHAN
Kabel NYM 3x2,5 m 15.000 11,000.00 165,000.00
Pipa conduit 20 mm m 15.000 1,250.00 18,750.00
Perlengkapan 10 % m 0.00
Jumlah B 183,750.00
C PERALATAN
- 0.00
- 0.00
Jumlah C 0.00
D Jumlah (A+B+C) 228,550.00
E Overhead & Profit (10 %) 22,855.00
F Harga Satuan Pekerjaan (D+E) 251,405.00

HSP-Halaman-31
DAFTAR HARGA SATUAN UPAH DAN BAHAN
KOTA BANDAR LAMPUNG
PERIODE : TRI WULAN II 2018

No. Uraian Satuan

1 2 3
A. UPAH
1 Pekerja Hari
2 Tukang Hari
3 Mandor Hari
4 Operator Hari
5 Pembantu Operator Hari
6 Sopir / Driver Hari
7 Pembantu Sopir / Driver Hari
8 Mekanik Hari
9 Pembantu Mekanik Hari
10 Kepala Tukang Hari

B. BAHAN
1 Abu Batu 0/0,5 M3
2 Acrylic Bening 10 mm 1 m x 2 m Lembar
2 Acrylic Bening 10 mm 122 cm x 244 cm Lembar
3 Acrylic Bening 2 mm 100 cm x 200 cm Lembar
3 Acrylic Bening 3 mm - kode 35432 - 100 cm x 200 cm Lembar
4 Acrylic Bening 3 mm 100 cm x 200 cm Lembar
4 Acrylic Bening 8 mm 100 cm x 200 cm Lembar
5 Acrylic Hitam Dof 2 mm , uk.100 x 200cm Lembar
5 Acrylic Kuning 3 mm - kode 235 A1 100cm x 200 cm Lembar
6 Acrylic Kuning 5 mm - kode 235 A1- 100 cm x 200 cm Lembar
6 Acrylic Susu 3 mm - kode 3 L 445 122 x 244 Lembar
7 Acrylic Susu 3 mm - kode 432 100 cm x 200 cm Lembar
7 Acrylic Susu 3 mm 122 cm x 244 cm Lembar
8 Acrylic Susu 3 mm 100 cm x 200 cm Lembar
8 Additive Liter
9 Air Liter
9 Alat Bantu Set
10 Almunium Composit M2
10 Almunium Foil M2
11 Alumunium Foil Bubble 2 Ply m2
11 Amplas Lembar
12 Asbes Gelombang 1.8 x 0.8 x 0.35 m Lembar
12 Asbes Gelombang 1.8 x 1.05 x 0.4 m Lembar
13 Aspal pen 60/70 Kg
13 Assetilline Botol
14 Automatic pompa Buah
14 Baja Sling dia. 12 mm M'
15 Baja Sling dia. 14 mm M'

Basic Price-Halaman-32
1 2 3
15 Baja Sling dia. 16 mm M'
16 Baja Sling dia. 18 mm M'
16 Baja Sling dia. 20 mm M'
17 Baja Sling dia. 25 mm M'
17 Baja Strip Kg
18 Bak Mandi Fiber 60,60,6 Buah
18 Bak Mandi Plastik Buah
19 Batako Buah
19 Bathtube Buah
20 Batu Alam Kota Agung M2
20 Batu Alam Palimanan M2
21 Batu Andesit 30 x 30 cm M2
21 Batu Bata Buah
22 Batu Bata Bolong Buah
22 Batu Bata Ringan Buah
23 Batu Belah Hitam M3
23 Batu Belah Putih M3
24 Batu Bolder 1 m - 2 m M3
24 Batu Bolder 50 m - 1 m M3
25 Batu Candi M2
25 Batu Kali Besar M3
26 Kapur Tohor M3
26 Batu Koral Sikat M2
27 Batu Koral Sikat (Pasang dengan bahan) M2
27 Batu Andesit Polos dan Motif 10 x 20 cm M2
28 Batu Andesit Polos dan Motif 20 x 20 cm M2
28 Batu Andesit Polos dan Motif 15 x 30 cm M2
29 Batu Andesit Polos dan Motif 20 x 30 cm M2
29 Batu Andesit Polos dan Motif 20 x 40 cm M2
30 Batu Muka M2
30 Batu pecah 0,5 - 1 cm / Screning M3
31 Batu pecah 1 - 2 cm M3
31 Batu pecah 10 - 15 cm (onderlaag H) M3
32 Batu Pecah 15 - 20 cm (onderlaag K) M3
32 Batu pecah 2 - 3 cm M3
33 Batu pecah 3 - 5 cm M3
33 Batu pecah 5 - 7 cm M3
34 Batu pecah 7 - 10 cm M3
34 Baut / Fixer / Skrup Alumunium Buah
35 Baut hitam dia. 16 mm Buah
35 Baut hitam dia. 19 mm Buah
36 Base A M3
36 Base B M3
37 Bensin (Non Subsidi) Liter
37 Besi Baja Profil Kg
38 Besi Baja IWF Kg
38 Besi Beton Ulir Kg
39 Besi Beton Polos Kg
39 Besi Wire mess M6 (210x540) lbr
40 Besi Wire mess M8 (210x540) lbr

Basic Price-Halaman-33
1 2 3
40 Besi Hollow Galvanis 4x4 (rangka ACP) Batang
41 Besi Hollow Plafond Meni 2x4 Batang
41 Besi Hollow Plafond Meni 4x4 Batang
42 Besi Hollow Plafond Galvanis 2x4 Batang
42 Besi Hollow Plafond Galvanis 4x4 Batang
43 Besi Plat Baja Motif Kg
43 Besi Plat Baja Polos Kg
44 Besi Siku 100 x 100 x 8mm - 6M Batang
44 Besi Siku 120 x 120 x 10mm - 12M Batang
45 Besi Siku 40 x 40 x 4mm - 6M Batang
45 Besi Siku 50 x 50 x 5mm - 6M Batang
46 Besi Siku 60 x 60 x 6mm - 6M Batang
46 Besi Siku 65 x 65 x 6mm - 6M Batang
47 Besi Siku 70 x 70 x 7mm - 6M Batang
47 Besi Siku 75 x 75 x 7mm - 6M Batang
48 Besi Siku 80 x 80 x 8mm - 6M Batang
48 Besi Siku 90 x 90 x 9mm - 6M Batang
49 Box meter Buah
49 Box Culvert 500 x 500, L = 1 m Unit
50 Box Culvert 600 x 600, L = 1 m Unit
50 Box Culvert 800 x 800, L = 1 m Unit
51 Box Culvert 1000 x 1000, L = 1 m Unit
51 Box Culvert 1500 x 1500, L = 1 m Unit
52 Box Culvert 2000 x 2000, L = 1 m Unit
52 Bronjong / Gabions Pabrikasi ukuran 2 / 1 / 1 Unit
53 Bronjong / Gabions Pabrikasi ukuran 3 / 1 / 0.5 Unit
53 Bronjong / Gabions Pabrikasi ukuran 3 / 1 / 1 Unit
54 Bronjong / Gabions Pabrikasi ukuran 3 / 1.5 / 0.5 Unit
54 Bronjong / Gabions Pabrikasi ukuran 2 / 1 / 0.5 Unit
55 Buis beton Ø 20 cm tidak bertulang M'
55 Buis beton Ø 30 cm tidak bertulang M'
56 Buis beton Ø 40 cm tidak bertulang M'
56 Buis beton Ø 50 cm tidak bertulang M'
57 Buis beton Ø 60 cm bertulang M'
57 Buis beton Ø 60 cm tidak bertulang M'
58 Buis beton Ø 70 cm bertulang M'
58 Buis beton Ø 80 cm bertulang M'
59 Buis beton Ø 80 cm tidak bertulang M'
59 Buis beton Ø 90 cm tidak bertulang M'
60 Buis beton Ø 90 cm bertulang M'
60 Buis beton Ø 100 cm bertulang M'
61 Cat Alkali/Dasar Kg
61 Cat Anti Karat (galvanis) Kg
62 Cat Besi Kg
62 Cat Genteng Kg
63 Cat Kayu Kg
63 Cat Marka (non Thermoplas) Kg
64 Cat Marka (Thermoplastic) Kg
64 Cat Meni Kg

Basic Price-Halaman-34
1 2 3
65 Cat Tembok Eksterior Kg
65 Cat Tembok Interior Kg
66 Cat Waterproofing Kg
66 Cerucuk Kayu Gelam/dolken 4M Btg
67 Closet Duduk Keramik (Natural) Buah
67 Closet Jongkok Keramik Buah
68 Daun pintu Kacar Drk Green 12mm (235x100) Lengkap Buah
68 Dempul Besi Kg
69 Dempul Kayu Kg
69 Door Closer Buah
70 Elastomer Ukuran 350mm x 400mm x 40mm Buah
70 Elastomer Ukuran 350mm x 450mm x 40mm Buah
71 Elastomer Ukuran 400mm x 450mm x 45mm Buah
71 Elastomer Ukuran 450mm x 450mm x 45mm Buah
72 Engsel Jendela Buah
72 Engsel Pintu Buah
73 Epoxy Grouting Kg
73 Epoxy Injection Kg
74 Epoxy Joint Sealant Kg
74 Filler Kg
75 Formika 120 x 240 cm Lembar
75 Floor Deck EFF 1000 mm tebal 0,75 mm M2
76 Floor Drain Plastik Buah
76 Floor Drain Stenless Buah
77 Floor Hardener MU-700 Kg
77 Floor Hinge Buah
78 Folding Gate M2
78 Handle Almunium Set
79 Frame Jendela Alumunium 4" m'
79 Frame Jendela Aluminium caouder Couting 4" Ponder m'
80 Frame Jendela Alumunium Coklat 4" coating m'
80 Gebalan Rumput M2
81 Genteng Beton Gelombang Buah
81 Genteng Beton Flat Buah
82 Genteng Glasur Kecil Buah
82 Genteng Kramik Buah
83 Genteng Mantili Buah
83 Genteng Metal berpasir M2
84 Genteng Metal polos M2
84 Genteng Plentong Buah
85 Genteng Bitumen Bergelombang Lbr
85 Geribik uk. 2 x 2 m Lbr
86 Glass Bead Kg
86 Glass Block Buah
87 Glasswool 1.2 x 15 x 0.5 m Roll
87 Glasswool 1.2 x 30 x 0.25 m Roll
88 Grandel Pintu pendek Buah
88 Grandel Pintu panjang Buah
89 Grandel Pintu tanam Buah
89 Grendel Jendela Buah

Basic Price-Halaman-35
1 2 3
90 Granit Tile 40 x 40 cm Buah
90 Granit Tile 60 x 60 cm Buah
91 Granit Ukuran Tertentu M2
91 Grass Block 8 x 30 x 45 cm M2
92 GRC Tebal 4 mm Lembar
92 GRC Tebal 6 mm Lembar
93 GRC Tebal 9 mm Lembar
93 Gypsum board Lembar
94 Hak Angin / Pengkait Buah
94 Engsel Angin (Cashement) Buah
95 Ijuk Ikat
95 Jendela nako (rangka + kaca 5 mm) M2
96 Kabel NYA 1 x 1.5 M'
96 Kabel NYA 1 x 2.5 M'
97 Kabel NYM 2 x 1.5 M'
97 Kabel NYM 2 x 2.5 M'
98 Kabel NYM 3 x 1.5 M'
98 Kabel NYM 3 x 2.5 M'
99 Kabel NYY 2 x 1.5 M'
99 Kabel NYY 2 x 2.5 M'
100 Kabel NYY 3 x 1.5 M'
100 Kabel NYY 3 x 2.5 M'
101 Kabel NYYGBY 4 x 25 M'
101 Kabel NYYGBY 4 x 35 M'
102 Kabel NYYHY 1 x 1,5 M'
102 Kabel NYYHY 3 x 2,5 M'
103 Kaca Cermin Tebal 5 mm M2
103 Kaca Darkblue 6 mm M2
104 Kaca Es M2
104 Kaca Film Sandblas M2
105 Kaca Polos 3 mm M2
105 Kaca Polos 5 mm M2
106 Kaca Polos Tebal 8 mm M2
106 Kaca Rayband 3 mm M2
107 Kaca Rayband 5 mm M2
107 Kaca Tempered Tebal 12 - 18 mm M2
108 Kaca Tempered Tebal 10 mm M2
108 Kaca Tempered Tebal 8 mm M2
109 Kawat Beton Kg
109 Kawat Duri M'
110 Kawat Galvanis Kg
110 Kawat Harmonika M2
111 Kawat Bronjong M16 mm M
111 Kawat Las Kotak
112 Kayu Bakar M3
112 Kayu Kelas I (Balok) M3
113 Kayu Kelas I (Papan) M3
113 Kayu Kelas II ( 2 x 3 Cm) M3
114 Kayu Kelas II ( 3 x 4 Cm) M3
114 Kayu Kelas II ( 5 x 7 cm) M3

Basic Price-Halaman-36
1 2 3
115 Kayu kelas II (balok) Meranti Payau M3
115 Kayu Kelas II (Papan) M3
116 Kayu Kelas III ( 2 x 3 cm) M3
116 Kayu Kelas III ( 5 x 7 cm) M3
117 Kayu Kelas III (Balok) M3
117 Kayu kelas III (papan) M3
118 Kayu Kelas IV M3
118 Kayu Perancah/Struktur M3
119 Keramik 10/10 Polos M2
119 Keramik 20/20 Polos M2
120 Keramik 20/20 Warna M2
120 Keramik 20/25 Polos M2
121 Keramik 20/25 Warna M2
121 Keramik 30/30 Polos M2
122 Keramik 30/30 Warna M2
122 Keramik 30/60 Polos M2
123 Keramik 40/40 Polos M2
123 Keramik 40/40 Warna M2
124 Keramik 50/50 Polos Buah
124 Keramik 50/50 Warna Buah
125 Keramik 60/60 Polos Buah
125 Keramik 60/60 Warna Polished Buah
126 Keramik Anti Selip ( Kasar ) Buah
126 Keramik Border Buah
127 Keramik Kuku Macan m
127 Keni PVC daimeter 1,5 " Buah
128 Kran Leideng 1/2" standar Buah
128 Kran Leideng 3/4" standar Buah
129 Kuas Buah
129 Kuas roll Buah
130 Kusen UPVC Jendela Kaca Mati m2
130 Kusen UPVC Jendela Jungkit m2
131 Kusen UPVC Jendela Sliding m2
131 Kusen UPVC Jendela Swing/Multi Lock m2
132 Kusen UPVC Pintu Singel/Gantung uk diatas 1,67 m2
132 Kusen UPVC Pintu Singel/Gantung uk di bawah 1,67 Unit
133 Kusen UPVC Pintu Singel 2 Daun / 4 Daun m2
133 Kusen UPVC Pintu Doubel m2
134 Kusen UPVC Partisi m'
134 Kusen UPVC Partisi Kaca M2
135 Kusen UPVC Partisi Panel M2
135 Kusen UPVC Tambahan Tiang MQ (uk 6x6) + Hollow (5x5) M'
136 Kusen UPVC Tambahan BokCP 33 m'
136 Kusen UPVC Boven Kaca Mati/ Sling uk Dibawah 0,45 m2 Unit
137 Kusen UPVC Boven Hidup / Jungkit uk Dibawah 0,55 m2 Unit
137 Kusen UPVC Boven Hidup / Swing uk Dibawah 0,62 m2 Unit
138 Kusen UPVC Jalusi Uk dibawah 0,5 m2 Unit
138 Kusen UPVC Boven Kaca Mati/ Sling uk Dibawah 0,45 m2 m2
139 Kusen UPVC Boven Hidup / Jungkit uk Dibawah 0,55 m2 m2
139 Kusen UPVC Boven Hidup / Swing uk Dibawah 0,62 m2 m2

Basic Price-Halaman-37
1 2 3
140 Kusen UPVC Jalusi Uk dibawah 0,5 m2 m2
140 Kusen UPVC List Fantasi /Variasi m'
141 Kusen UPVC Pintu Kamar Mandi (70x190) Unit
141 Kunci Tanam (Rumah Kunci + Handle) Set
142 Lampu Downlight Inbow 3" Buah
142 Lampu Downlight Inbow 4" Buah
143 Lampu Downlight Outbow Buah
143 Lampu SL 18 watt Buah
144 Lampu LED 15 W Buah
144 Lampu LED 10 W Buah
145 Lampu LED 9 W Buah
145 Lampu LED 7 W Buah
146 Lampu LED 6 W Buah
146 Lampu LED 4 W Buah
147 Lampu LED 3 W Buah
147 Lampu Spotlight 1000 watt LED Buah
148 Lampu Spotlight 500 watt LED Buah
148 Lampu TL 2 x 20 watt inbow Buah
149 Lampu Pijar 25 Watt Buah
149 Lampu Pijar 40 Watt Buah
150 Lampu Pijar 60 Watt Buah
150 Lampu RM 2x36 Watt Buah
151 Lem Aibond kg
151 Lem Kayu Kg
152 List Gipsum Per / M M'
152 List Plafond Kayu M'
153 Listplank GRC lebar 20 cm M'
153 Minyak Cat (Tiner) Liter
154 Minyak Fluks Liter
154 Minyak Pelumas Liter
155 Minyak Tanah/Kerosen (Industri) Liter
155 Multiplek ( 122 x 244 ) 10 mm Lembar
156 Multiplek ( 122 x 244 ) 12 mm Lembar
156 Multiplek ( 122 x 244 ) 9 mm Lembar
157 Nok Asbes Bh
157 Nok Asbes Gelombang Kecil Bh
158 Nok Genteng Bitumen Buah
158 Nok Genteng Beton Buah
159 Nok Genteng Kramik / Glasur Buah
159 Nok Genteng Metal M'
160 Oxygen tabung
160 Over shok diameter 1,5 " Buah
161 Over shok diameter 3/4 " Buah
161 Paku Kg
162 Paku 1,5 - 3" Kg
162 Paku 1/2 - 1" Kg
163 Paku 4 - 6" Kg
163 Paku Asbes Kg
164 Paku Atap Bitumen Buah
164 Paku Baja Buah

Basic Price-Halaman-38
1 2 3
165 Paku Beton Kotak
165 Paku Seng Kg
166 Paku skrup Kg
166 Paku Triplek Kg
167 Pasir Beton M3
167 Pasir Pasang M3
168 Pasir Urug M3
168 Paving Block tebal 6 cm Buah
169 Paving Block tebal 8 cm Buah
169 Paving Block tebal 6 cm Warna Buah
170 Paving Block tebal 8 cm Warna Buah
170 Pemasangan KWH PLN 2200 watt (voucer) Unit
171 Pintu WC Fiber/PVC Buah
171 Pipa Conduit 20 mm Batang
172 Pipa Galvanis Medium 1 - 1/2 " x 3,20mm x 6M Batang
172 Pipa Galvanis Medium 1 - 1/4 " x 3,20mm x 6M Batang
173 Pipa Galvanis Medium 1 " x 3,20mm x 6M Batang
173 Pipa Galvanis Medium 1/2 " x 2,60mm x 6M Batang
174 Pipa Galvanis Medium 2 - 1/2 " x 3,60mm x 6M Batang
174 Pipa Galvanis Medium 2 " x 3,60mm x 6M Batang
175 Pipa Galvanis Medium 3 " x 3,2mm x 6M Batang
175 Pipa Galvanis Medium 3/4 " x 3mm x 6M Batang
176 Pipa Galvanis Medium 4 " x 4,50mm x 6M Batang
176 Pipa Galvanis Medium 5 " x 4,5mm x 6M Batang
177 Pipa Galvanis SCH 40 1 - 1/2 " x 3,3mm x 6M SNI Batang
177 Pipa Galvanis SCH 40 1 - 1/4 " x 3,20mm x 6M SNI Batang
178 Pipa Galvanis SCH 40 2 - 1/2 " x 3,60mm x 6M Batang
178 Pipa Galvanis SCH 40 2 " x 3,60mm x 6M Batang
179 Pipa Galvanis SCH 40 3 " x 4,00mm x 6M Batang
179 Pipa Galvanis SCH 40 4 " x 4,50mm x 6M Batang
180 Pipa Galvanis SCH 40 5 " x 4,85mm x 6M Batang
180 Pipa Galvanis SCH 40 6 " x 4,85mm x 6M Batang
181 Pipa Galvanis SCH 40 8 " x 5,00mm x 6M Batang
181 Pipa Galvanis SCH 40 1 " x 3,20mm x 6M Batang
182 Pipa Galvanis SCH 40 1/2 " x 2,60mm x 6M Batang
182 Pipa Galvanis SCH 40 3/4 " x 2,60mm x 6M Batang
183 Pipa Hitam Medium 1 - 1/2 " x 3mm x 6M Batang
183 Pipa Hitam Medium 1 - 1/4 " x 3mm x 6M Batang
184 Pipa Hitam Medium 1 " x 3mm x 6M Batang
184 Pipa Hitam Medium 1/2 " x 2,3mm x 6M Batang
185 Pipa Hitam Medium 2 - 1/2 " x 3mm x 6M Batang
185 Pipa Hitam Medium 2 " x 2,1 mm x 6M Batang
186 Pipa Hitam Medium 3 " x 2,2mm x 6M Batang
186 Pipa Hitam Medium 3/4 " x 2mm x 6M Batang
187 Pipa Hitam Medium 4 " x 1,8 mm x 6M Batang
187 Pipa Hitam Medium 5 " x 2,8 mm x 6M Batang
188 Pipa Hitam Medium 6 " x 3,2mm x 6M Batang
188 Pipa Hitam Medium 8 " x 4,5mm x 6M Batang
189 Pipa Hitam SCH 40 1 - 1/2 " x 3,7mm x 6M Batang
189 Pipa Hitam SCH 40 1 - 1/4 " x 3,6mm x 6M Batang

Basic Price-Halaman-39
1 2 3
190 Pipa Hitam SCH 40 1 " x 3,4mm x 6M Batang
190 Pipa Hitam SCH 40 1/2 " x 2,8mm x 6M Batang
191 Pipa Hitam SCH 40 2 - 1/2 " x 5,2mm x 6M Batang
191 Pipa Hitam SCH 40 2 " x 3,9mm x 6M Batang
192 Pipa Hitam SCH 40 3 " x 5,5mm x 6M Batang
192 Pipa Hitam SCH 40 3/4 " x 2,9mm x 6M Batang
193 Pipa Hitam SCH 40 4 " x 6mm x 6M Batang
193 Pipa Hitam SCH 40 5 " x 6,6mm x 6M Batang
194 Pipa Hitam SCH 40 6 " x 7,1mm x 6M Batang
194 Pipa Hitam SCH 40 8 " x 8,2mm x 6M Batang
195 Pipa PVC Berlubang 4" M'
195 Plywood t = 9 mm Lembar
196 PVC 4 m diameter 0,5" Batang
196 PVC 4 m diameter 0,75" Batang
197 PVC 4 m diameter 1" Batang
197 PVC 4 m diameter 1,5" Batang
198 PVC 4 m diameter 2" Batang
198 PVC 4 m diameter 2,5" Batang
199 PVC 4 m diameter 3" Batang
199 PVC 4 m diameter 4" Batang
200 PVC 4 m diameter 6 " Batang
200 Pitting Lampu Buah
201 Plamir Kayu Liter
201 Plamir Tembok Kg
202 Plat Bordes / Spandek 2,3mm x 4’ x 8’ Lembar
202 Plat Bordes / Spandek3,2mm x 4’ x 8’ Lembar
203 Plat Bordes / Spandek3mm x 4’ x 8’ Lembar
203 Plat Hitam 10 mm x 4' x 8' Lembar
204 Plat Hitam 12 mm x 4' x 8' Lembar
204 Plat Hitam 15 mm x 4' x 8' Lembar
205 Plat Hitam 16 mm x 4' x 8' Lembar
205 Plat Hitam 19 mm x 4' x 8' Lembar
206 Plat Hitam 2 mm x 4' x 8' Lembar
206 Plat Hitam 2,3 mm x 4' x 8' Lembar
207 Plat Hitam 2,5 mm x 4' x 8' Lembar
207 Plat Hitam 2,8 mm x 4' x 8' Lembar
208 Plat Hitam 20 mm x 4' x 8' Lembar
208 Plat Hitam 25 mm x 4' x 8' Lembar
209 Plat Hitam 4 mm x 4' x 8' Lembar
209 Plat Hitam 5 mm x 4' x 8' Lembar
210 Plat Hitam 6 mm x 4' x 8' Lembar
210 Plat Hitam 8 mm x 4' x 8' Lembar
211 Plat Strip Kg
211 Plin Ubin Abu-abu Buah
212 Plin Ubin Traso Buah
212 Plafond PVC Polos M2
213 Plafond PVC Motif M2
213 Plafond PVC List 1,5 cm M'
214 Plafond PVC List 5 cm M'
214 Plafond PVC List 8 cm M'

Basic Price-Halaman-40
1 2 3
215 Plint granit 10/60 cm Buah
215 Plint granit 10/40 cm Buah
216 Plint keramik 10 x 20 cm Buah
216 Plint keramik 10 x 30 cm Buah
217 Plint keramik 10 x 40 cm Buah
217 Plint tegel 10/20 cm Buah
218 Plint tegel 10/30 cm Buah
218 Politur Kg
219 Politur Jadi Kg
219 Polycarbonate roofing sheet 5 ml (10-15 th) m2
220 Polycarbonate roofing sheet 6 ml (10-15 th) m2
220 Polycarbonate roofing sheet 10 ml (10-15 th) m2
221 Pompa sub marsible 1 Pk Buah
221 Pompa sub marsible 3/4 Pk Buah
222 Pompa sub marsible 2 Pk Buah
222 Profil baja ringan reng Kecil R30 6m Batang
223 Profil baja ringan reng R32 Batang
223 Profil baja ringan reng R40 6m Batang
224 Profil baja ringan C.80 1 milli 6m Batang
224 Profil baja ringan C.80 0,75 milli Batang
225 Profil baja ringan C.80 0,75 B milli Batang
225 Profil baja ringan C.80 0,60 milli Batang
226 Profil baja ringan C.65 Batang
226 Profil baja ringan C.75 Batang
227 Profil baja ringan C.75 0,75 B milli Batang
227 Profil baja ringan C.75 0,60 B milli Batang
228 Nok Polos B 90 /1 m Batang
228 Nok Polos K Batang
229 Nok Pasir Batang
229 Talang Juray 3m Batang
230 Guard Rail Bh
230 End Block Bh
231 Post Bh
231 Steel Block Bh
232 Mur Baut Guard Rail Bh
232 Mur Baut Hexagon Bh
233 Guard Rail Reflector Bh
233 Rolling Door Almunium M2
234 Rolling Door Besi M2
234 Rolling Door Perforated 20 cm M2
235 Rolling Door Perforated 80 cm M2
235 Rolling Door Perforated Full M2
236 Roster Beton Buah
236 Reducer PVC diameter 6" Buah
237 Saklar ganda Buah
237 Saklar Triple Buah
238 Saklar tunggal Buah
238 Sand Bag ( 50 Kg ) Buah
239 Seal Tape Buah
239 Semen Anti Sulfur Zak

Basic Price-Halaman-41
1 2 3
240 Semen PC Kg
240 Semen Putih/Nat Kg
241 Semen Warna Kg
241 Seng Gelombang BJLS 27 Lembar
242 Seng Gelombang BJLS 30 Lembar
242 Seng Gelombang Fiber Lembar
243 Seng Plat Alumunium Lembar
243 Seng Plat BJLS 27 Lembar
244 Seng Plat BJLS 30 Lembar
244 Sealant Tube
245 Sel tape Buah
245 Solar industri Liter
246 Sok PVC diameter 1,5" Buah
246 Shok drat Luar PVC diameter 1,5 " Buah
247 Shok drat Dalam PVC diameter 1,5 " Buah
247 Spandek 0,30 mm m2
248 Spandek warna L 1m t =0,30 mm m2
248 Spandek warna L 1m t =0,40 mm m2
249 Spandek warna L 1m t =0,35 mm m2
249 Spandek warna L 80 m t =0,35 mm m2
250 Spandek warna L 80m x 180 lbr kodi
250 Spandek Fiber m2
251 Spandekk UPVC Biasa M2
251 Spandekk UPVC Transparan M2
252 Stop kontak Buah
252 Stop Kontak AC Buah
253 Stop Kran diameter 1,5 " Buah
253 Tali Tambang Nilon m'
254 Tanah Urug Pilihan m3
254 Tanah Urug Biasa M3
255 Tarikan Jendela Buah
255 Tegel Badak Buah
256 Tempat Sabun Keramik Buah
256 Teralis Jendela Klasik M2
257 Teralis Jendela Minimalis M2
257 Tower Air Fiber 1 m3 Buah
258 Tower Air Fiber 2 m3 Buah
258 Tower Air Fiber 3 m3 Buah
259 Tower Air Fiber 5 m3 Buah
259 Tower Air Stainless Steel 1 m3 Buah
260 Tower Air Stainless Steel 2 m3 Buah
260 Tower Air Stainless Steel 3 m3 Buah
261 Tower Air Stainless Steel 5 m3 Buah
261 Triplek 3 mm Lembar
262 Triplek 4 mm Lembar
262 Triplek 6 mm Lembar
263 Ubin Abu-abu Buah
263 Ubin Traso Buah
264 Urinoir (cek Harga untuk 1 set lengkap) Set

Basic Price-Halaman-42
BAHAN

Harga Ket.
Satuan
(Rp.)
4

80,000.00
100,000.00
125,000.00
150,000.00
100,000.00
100,000.00
80,000.00
150,000.00
100,000.00
125,000.00

386,800.00
1,500,000.00
2,100,000.00
310,000.00
450,000.00
330,000.00
1,170,000.00
450,000.00
550,000.00
650,000.00
670,000.00
450,000.00
670,000.00
450,000.00
43,000.00
100.00
75,000.00
650,000.00
10,000.00
40,000.00
15,000.00
30,000.00
30,000.00
12,020.00

60,000.00
40,000.00
45,000.00

Basic Price-Halaman-43
4
50,000.00
75,000.00
85,000.00
125,000.00
12,000.00
220,000.00
250,000.00
4,500.00
2,920,000.00
70,000.00
135,000.00
160,000.00
500.00
650.00
12,350.00
278,800.00
256,300.00

150,000.00
150,000.00

140,000.00
150,000.00
150,000.00
150,000.00
150,000.00
150,000.00
150,000.00
60,000.00
328,300.00
392,200.00
322,600.00
334,500.00
382,400.00
360,800.00
366,500.00
366,500.00
1,000.00
19,000.00
20,000.00
400,600.00
347,800.00
10,000.00
15,000.00
16,500.00
12,500.00
12,500.00
350,000.00
640,000.00

Basic Price-Halaman-44
4
120,000.00
13,500.00
16,500.00
16,000.00
22,000.00
12,000.00
12,000.00
720,000.00
1,250,000.00
165,000.00
255,000.00
300,000.00
440,000.00
420,000.00
465,000.00
550,000.00
700,000.00
85,000.00
1,485,000.00
1,815,000.00
2,585,000.00
6,548,300.00
7,095,000.00
14,069,000.00

70,000.00
75,000.00
135,000.00
150,000.00
350,000.00
300,000.00
400,000.00
475,000.00
400,000.00
500,000.00
550,000.00
650,000.00
51,500.00
75,000.00
62,500.00
62,500.00
62,500.00
70,000.00
88,000.00
102,000.00

Basic Price-Halaman-45
4
110,000.00
75,000.00
55,000.00
25,000.00
2,500,000.00
350,000.00
4,000,000.00
76,000.00
40,000.00
225,000.00
711,000.00
799,000.00
997,000.00
1,118,000.00
20,000.00
40,000.00
68,000.00
126,500.00
63,250.00
1,200.00
320,000.00
122,000.00
20,000.00
150,000.00
3,625.00

1,350,000.00
40,000.00
105,000.00
105,000.00
120,000.00
35,000.00
9,000.00
11,000.00
4,500.00
15,000.00
1,200.00
123,500.00
47,000.00
1,350.00
164,500.00
uk. 200x95x0.3 cm
80,000.00
66,000.00
21,000.00
480,000.00
580,000.00
25,000.00
50,000.00
150,000.00
25,000.00

Basic Price-Halaman-46
4
28,000.00
87,500.00
500,000.00
115,500.00
65,000.00
125,000.00
162,000.00
73,000.00
25,000.00
50,000.00
13,000.00
92,500.00
4,200.00
6,200.00
6,200.00
8,800.00
7,900.00
11,000.00
9,000.00
12,000.00
11,000.00
15,000.00

180,000.00
120,000.00
100,000.00
55,000.00
56,000.00
93,000.00
170,000.00
67,000.00
97,000.00
700,000.00
600,000.00
430,000.00
22,500.00
20,000.00
20,000.00
20,000.00
20,000.00
135,000.00
150,000.00
17,000,000.00
17,000,000.00
3,400,000.00
3,480,000.00
3,580,000.00

Basic Price-Halaman-47
4
4,125,000.00
4,125,000.00
3,085,000.00
3,125,000.00
3,000,000.00
3,100,000.00
1,750,000.00
1,600,000.00

87,000.00
90,000.00
89,000.00
96,000.00
87,000.00
105,000.00
110,000.00
110,000.00
124,000.00
30,875.00
33,125.00
77,400.00
82,250.00
73,000.00
10,000.00
7,000.00
10,000.00
25,000.00
35,000.00
30,000.00
27,500.00
1,000,000.00
1,250,000.00
1,250,000.00
1,450,000.00
1,800,000.00
3,000,000.00
1,650,000.00
1,800,000.00
250,000.00
250,000.00
300,000.00
350,000.00
100,000.00
450,000.00
700,000.00
900,000.00
550,000.00
900,000.00
1,100,000.00
1,300,000.00

Basic Price-Halaman-48
4
1,000,000.00
100,000.00
1,400,000.00
250,000.00
25,000.00
30,000.00
70,000.00
40,000.00
65,000.00
52,500.00
45,000.00
35,000.00
32,500.00
30,000.00
22,500.00
650,000.00
400,000.00
270,000.00
10,000.00
10,000.00
10,000.00
150,000.00
35,000.00
18,000.00
35,000.00
35,000.00
45,000.00
20,000.00

34,500.00

160,000.00
195,000.00
120,000.00
28,000.00
30,000.00
40,000.00
12,000.00
12,000.00
26,000.00
115,000.00
8,000.00
3,500.00
15,000.00
15,000.00
20,000.00
14,000.00
45,000.00

55,000.00

Basic Price-Halaman-49
4
45,000.00
40,000.00
30,000.00
30,000.00
257,200.00
255,000.00
242,500.00
2,600.00
3,000.00
3,500.00
4,000.00
3,500,000.00
252,000.00
7,500.00
440,000.00
380,000.00
290,000.00
160,000.00
750,000.00
600,000.00
790,000.00
190,000.00
1,400,000.00
1,850,000.00

300,000.00
270,000.00
200,000.00
110,000.00
520,000.00
320,000.00
520,000.00
140,000.00
730,000.00
830,000.00
2,300,000.00
2,650,000.00
425,000.00
390,000.00

Basic Price-Halaman-50
4
270,000.00
150,000.00
820,000.00
600,000.00
1,075,000.00
200,000.00
1,450,000.00
2,100,000.00
2,610,000.00
3,750,000.00
290,000.00
95,000.00
22,000.00
28,500.00
42,000.00
65,000.00
85,000.00
128,000.00
251,000.00
290,000.00
875,000.00

50,000.00
52,500.00
545,000.00
870,000.00
760,000.00

12,000.00

200,000.00
350,000.00
18,000.00
55,000.00
70,000.00

Basic Price-Halaman-51
4
20,000.00
15,000.00
10,000.00
10,000.00
10,000.00

30,000.00
58,000.00
120,000.00
160,000.00
190,000.00
8,800,000.00
8,500,000.00
12,500,000.00

44,500.00
58,000.00

80,500.00
89,900.00

28,200.00
26,000.00
47,500.00
135,000.00
1,812,500.00
319,000.00
758,312.50
146,250.00
11,875.00
6,875.00
37,812.50
516,000.00
354,000.00
620,000.00
660,000.00
780,000.00
20,000.00
35,000.00
36,000.00
38,500.00
19,000.00
3,500.00
3,500.00

Basic Price-Halaman-52
4
1,200.00
20,000.00
25,000.00
62,500.00
50,000.00
85,000.00
200,000.00

27,500.00
4,000.00
13,070.55
16,500.00
12,000.00
17,000.00
64,500.00
130,000.00
158,000.00
58,000.00
56,000.00
768,000.00
960,000.00
185,000.00
190,000.00
34,000.00
75,000.00
199,500.00
4,000.00
75,000.00
40,000.00
25,000.00

35,000.00

2,250,000.00
4,000,000.00
5,290,000.00
8,395,000.00
3,300,000.00
4,200,000.00
9,600,000.00
15,700,000.00
60,000.00
75,000.00
82,000.00

2,670,000.00

Basic Price-Halaman-53
Kode
A.2.3.1.3.

A.2.3.1.9.
Supl A.2.3.1.10
A.2.3.1.11
A.3.2.1.2.
A.4.1.1.4
A.4.1.1.5
A.4.1.1.8
A.4.1.1.9
A.4.1.1.17
A.4.1.1.20
A.4.1.1.21
A.4.1.1.22
A.4.1.1.23
A.4.1.1.24
A.4.1.1.26
A.4.2.1.1
A.4.2.1.2
Supl A.4.2.1.13a
Supl A.4.2.1.13b
Supl A.4.2.1.13f
Supl A.4.2.1.13g
Supl A.4.2.1.13h
Supl A.4.2.1.13i
A.4.2.1.21
Supl A.4.2.1.21
A.4.4.1.3
A.4.4.1.9
A.4.4.2.4.
A.4.4.3.13
Supl A.4.4.3.12
Supl A.4.4.3.28
Supl A.4.4.3.54
Supl A.4.4.3.65
Supl A.4.5.1.5.
Supl A.4.5.1.9.
A.5.1.1.2.
A.5.1.1.4.
A.5.1.1.5.
A.5.1.1.14.
A.5.1.1.19.
A.5.1.1.25.
A.5.1.1.26.
A.5.1.1.27.
A.5.1.1.29.
A.5.1.1.32.
Supl A.4.5.2.13
Supl A.4.5.2.37
Supl A.4.5.2.37a

Supl A.4.7.1.10a
Supl A.4.7.1.10b
Supl A.4.7.1.10c
Supl A.8.4.3.16a
Supl A.8.4.3.16b
Supl A.8.4.3.16c
Supl A.8.4.3.16d
Supl A.8.4.3.16e
Supl A.8.4.3.16f
Supl A.8.4.3.16g
Supl A.8.4.3.16h
Pekerjaan
A.2.3.1.3. Menggali 1 m3 tanah biasa sampai dengan sedalam 3 m

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah


A.2.3.1.10. Pengurugan 1 m3 dengan tanah pilihan (dipadatkan per 20 cm)
A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug
A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K-100) slump (3-6) cm, w/c = 0,87
A.4.1.1.5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K-175) slump (12±2) cm, w/c = 0,66
A.4.1.1.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K-250) slump (12±2) cm, w/c = 0,56
A.4.1.1.9 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K-300)
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi
A.4.1.1.21 Pemasangan 1 m2 bekisting untuk Sloof
A.4.1.1.22 Pemasangan 1 m2 bekisting untuk Kolom
A.4.1.1.23 Pemasangan 1 m2 bekisting untuk Balok
A.4.1.1.24 Pemasangan 1 m2 bekisting untuk Lantai
A.4.1.1.26 Pemasangan 1 m2 bekisting untuk Tangga
A.4.2.1.1 Pemasangan 1 kg besi profil
A.4.2.1.2 Pemasangan 1 kg rangka kuda-kuda baja IWF
A.4.2.1.13a Pemasangan pintu taekwood rangka alluminium (P1)
A.4.2.1.13b Pemasangan pintu kaca es rangka alluminium (P2) untuk KM/WC
A.4.2.1.13f Pemasangan Jendela Alumunium + Kaca (J1)
A.4.2.1.13g Pemasangan Jendela Alumunium + Kaca (J1)
A.4.2.1.13h Pemasangan Bouven Alumunium + Kaca (BV1)
A.4.2.1.13i Pemasangan Bouven Alumunium + Kaca (BV)
A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60
A.4.2.1.21 Pemasangan 1 m2 Aluminium Composit Panel (ACP)
A.4.4.1.3 Pemasangan 1 m2 dinding bata merah (bata bolong) cm tebal 1 batu campuran 1SP : 4PP
A.4.4.1.9 Pemasangan 1 m2 dinding bata merah (bata bolong) cm tebal 1/2 batu campuran 1SP : 4PP
A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm
A.4.4.3.13. Pemasangan 1 m2 lantai granit ukuran 60 cm x 60 cm
A.4.4.3.12. Pemasangan 1 m2 lantai keramik ukuran 50 cm x 50 cm
A.4.4.3.28. Pemasangan 1 m’ plint granit ukuran 10 cm x 60 cm
A.4.4.3.54.Pemasangan 1 m2 dinding keramik 30 cm x 60 cm
A.4.4.3.65.Pemasangan 1 m2 conblock tebal 8 cm
A.4.5.1.5.Pemasangan 1 m2 langit-langit (plafond) PVC
A.4.5.1.9.Pemasangan 1 m list plafond PVC 5cm
A.5.1.1.2. Pemasangan 1 buah closet jongkok
A.5.1.1.4. Pemasangan 1 buah urinoir
A.5.1.1.5. Pemasangan 1 buah wastafel
A.5.1.1.14. Pemasangan 1 buah floor drain
A.5.1.1.19. Pemasangan 1 buah kran air
A.5.1.1.25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2 ”
A.5.1.1.26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ”
A.5.1.1.27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ”
A.5.1.1.29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 ”
A.5.1.1.32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4 ”
A.4.5.2.13. Pemasangan 1 m2 atap Bitumen
A.4.5.2.37. Pemasangan 1 m' Bubungan (Nok) atap Bitumen
A.4.5.2.37a. Pemasangan 1 m' Listplank GRC

A.4.7.1.10a. Pengecatan interior 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A.4.7.1.10b. Pengecatan exterior 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A.4.7.1.10c. Waterproofing 1 m2
A.8.4.3.16a. Pemasangan RM 2x36 Watt
A.8.4.3.16b. Pemasangan Lampu Down Light 3"
A.8.4.3.16c. Pemasangan Spot Light LED
A.8.4.3.16d. Pemasangan Spot Light Out Door
A.8.4.3.16e. Pemasangan Stop Kontak
A.8.4.3.16f. Pemasangan Stop Kontak AC
A.8.4.3.16g. Pemasangan Saklar Double
A.8.4.3.16h. Pemasangan Instalasi Listrik
HSP (Rp)
101,612.50
28,325.00
50,875.00
209,271.70
347,875.00
749,001.00
964,660.53
1,118,888.80
1,184,822.82
1,208,195.53
16,346.00
225,995.00
242,962.50
404,030.00
415,844.00
514,030.00
368,197.50
32,092.50
33,990.00
2,660,769.44
1,847,934.50
4,582,093.52
2,683,761.34
1,842,526.53
378,308.29
108,854.17
1,045,462.00
234,327.50
113,839.00
61,993.80
402,539.50
282,727.50
43,541.30
389,950.00
281,334.35
288,062.50
84,205.00
691,350.00
3,166,350.00
2,284,700.00
178,942.50
78,567.50
20,669.00
23,564.75
48,290.00
54,169.50
153,579.25
161,137.31
100,430.00
107,690.00

45,443.75
59,303.75
53,528.75
230,780.00
79,530.00
533,280.00
835,780.00
90,420.00
140,030.00
92,840.00
251,405.00
LAMPIRAN IV : KEPUTUSAN WALIKOTA BANDAR LAMPUNG
NOMOR :
TANGGAL :

HARGA SATUAN SEWA PERALATAN PEKERJAAN KONSTRUKSI

No. Uraian Kode HP Kapasitas

1 ASPHALT MIXING PLANT (E01) 294.0 60.00 T/Jam


2 ASPHALT FINISHER (E02) 72.4 10.00 Ton
3 ASPHALT SPRAYER (E03) 4.0 850.00 Liter
4 BULLDOZER 100-150 HP (E04) 155.0 - -
5 COMPRESSOR 4000-6500 L\M (E05) 60.0 5,000.00 CPM/(L/m)
6 CONCRETE MIXER 0.3-0.6 M3 (E06) 20.0 500.00 Liter
7 CRANE 10-15 TON (E07) 138.0 15.00 Ton
8 DUMP TRUCK 3.5 TON (E08) 100.0 5.00 Ton
9 DUMP TRUCK 10 TON (E09) 190.0 10.00 Ton
10 EXCAVATOR 80-140 HP (E10) 133.0 0.93 M3
11 FLAT BED TRUCK 3-4 M3 (E11) 190.0 10.00 ton
12 GENERATOR SET (E12) 180.0 135.00 KVA
13 MOTOR GRADER >100 HP (E13) 135.0 10,800.00 -
14 TRACK LOADER 75-100 HP (E14) 70.0 0.80 M3
15 WHEEL LOADER 1.0-1.6 M3 (E15) 96.0 1.50 M3
16 THREE WHEEL ROLLER 6-8 T (E16) 55.0 8.00 Ton
17 TANDEM ROLLER 6-8 T. (E17) 82.0 8.00 Ton
18 TIRE ROLLER 8-10 T. (E18) 100.5 9.00 Ton
19 VIBRATORY ROLLER 5-8 T. (E19) 82.0 8.00 Ton
20 CONCRETE VIBRATOR (E20) 5.5 25.00 -
21 STONE CRUSHER (E21) 220.0 50.00 T/Jam
22 WATER PUMP 70-100 mm (E22) 6.0 - -
23 WATER TANKER 3000-4500 L. (E23) 100.0 4,000.00 Liter
24 PEDESTRIAN ROLLER (E24) 8.8 835.00 Kg
25 TAMPER (E25) 4.7 121.00 Kg
26 JACK HAMMER (E26) 0.0 1,330.00 -
27 FULVI MIXER (E27) 345.0 2,005.00 -
28 CONCRETE PUMP (E28) 100.0 8.00 M3
29 TRAILER 20 TON (E29) 175.0 20.00 Ton
30 PILE DRIVER + HAMMER (E30) 25.0 2.50 Ton
31 CRANE ON TRACK 35 TON (E31) 125.0 35.00 Ton
32 WELDING SET (E32) 40.0 250.00 Amp
33 BORE PILE MACHINE (E33) 150.0 2,000.00 Meter
34 ASPHALT LIQUID MIXER (E34) 5.0 1,000.00 Liter
35 TRONTON (E35) 150.0 15.00 Ton
36 COLD MILLING MACHINE (E36) 248.0 1,000.00 M
37 ROCK DRILL BREAKER (E37) 3.0 - -
38 COLD RECYCLER (E38) 900.0 2.20 M
39 HOT RECYCLER (E39) 400.0 3.00 M
40 AGGREGAT (CHIP) SPREADER (E40) 115.0 3.50 M
41 ASPHALT DISTRIBUTOR (E41) 115.0 4,000.00 Liter
42 SLIP FORM PAVER (E42) 105.0 2.50 M
43 CONCRETE PAN MIXER (E43) 134.0 600.00 Liter
44 CONCRETE BREAKER (E44) 290.0 20.00 m3/jam
45 ASPAHLT TANKER (E45) 190.0 4,000.00 liter
46 CEMENT TANKER (E46) 190.0 4,000.00 liter
47 CONDRETE MIXER (350) (E47) 20.0 350.00 liter
48 VIBRATING RAMMER (E48) 4.2 80.00 KG
49 TRUK MIXER (AGITATOR) (E49) 220.0 5.00 M3
50 BORE PILE MACHINE DIA 60 (E50) 125.0 60.00 CM
51 CRANE ON TRACK 75-100 TON (E51) 200.0 75.00 Ton
52 BLENDING EQUIPMENT (E52) 50.0 30.00 Ton
53 ASPHALT LIQUID MIXER (20KL) (E34a) 40.0 20,000.00 Liter
54 BATCHING PLANT (E53) 20.0 400.00 liter
55 CHAIN SAW (E54) 3.0 - -
56 MESIN CAT MARKA (E57) LS
57 CUTTER MACHINE LS
58 MESIN LAS LISTRIK LS
59 PIPE SUPPORT
60 Sewa Tripot/Tackel & handle crane 2 T
61 Peralatan potong pipa T1/Manual (gergaji) / Saw
62 Peralatan potong pipa T2/Mekanik / Cilinder Saw
63 CRANE 3 TON
64 Sewa Pompa Submersible 3m3/h
65 PIPE SUPPORT
66 Sewa Tripot/Tackel & handle crane 2 T
67 Peralatan potong pipa T1/Manual (gergaji) / Saw
68 Peralatan potong pipa T2/Mekanik / Cilinder Saw
69 CRANE 3 TON
70 Sewa Pompa Submersible 3m3/h

Bandar Lampung, 2018


Walikota Bandar Lampung,
HERMAN HN.
KOTA BANDAR LAMPUNG

ONSTRUKSI

Biaya Sewa
Alat / Jam
(di luar PPn)

11,095,759.00
1,588,445.00
79,704.00
917,437.00
228,886.00
95,506.00
755,490.00
513,495.00
684,156.00
817,993.00
614,337.00
587,793.00
897,670.00
353,354.00
749,900.00
392,725.00
567,652.00
614,837.00
490,681.00
53,409.00
846,777.00
53,318.00
384,067.00
103,220.00
55,988.00
43,521.00
1,394,526.00
340,137.00
652,176.00
301,158.00
563,568.00
152,041.00
856,660.00
53,461.00
545,480.00
1,610,440.00
341,154.00
6,914,939.00
7,684,498.00
537,819.00
447,041.00
608,528.00
652,559.00
1,051,539.00
673,567.00
673,567.00
104,638.00
56,937.00
821,339.00
675,161.00
798,586.00
300,133.00
151,832.00
420,902.00
45,857.00
50,000.00
15,000.00
25,000.00
1,428.57
7,142.86
10,714.29
17,142.86
36,902.00
6,285.71
1,428.57
7,142.86
10,714.29
17,142.86
36,902.00
6,285.71

Anda mungkin juga menyukai