Anda di halaman 1dari 64

G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

SITE WORK
Earth Works

A Shoring & De-watering works 1 Item #REF! Included in Bill


No.06 Provisional
Sum

B Site clearence 1 Item #REF! Included in below


Item

General excavation
C Excavation for Foundations 1,070 m3 -

BILL NO.02 1 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Backfilling with selected excavated material


D Backfill with selected excavated material and well
compact in layers around foundations and raft slab 880 m3 -

E Cart away surplus excavated material to 190 m3 Included in Bulk


government specified location (provisional Excavation
quantity )

BILL NO.02 2 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

DISPOSAL

Imported fill material


F Imported fill material 560 m3 -

Anti-termite Treatment
G Anti-termite Treatment 990 m2 -

BILL NO.02 3 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 1 -

BILL NO.02 4 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

CONCRETE WORK

SUB STRUCTURE

IN SITU CONCRETE
Plain poured concrete - SRC 30/20
A 50mm thick Blinding 70 m3 -

Reinforced Sulphate Resistant Cement Concrete


Grade 40 /20
B In Raft slab 135 m3 -

BILL NO.02 5 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

C In Column 9 m3 -

D In tie-beam 38 m3 -

E In walls 22 m3 -

BILL NO.02 6 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

F In ground floor slab 58 m3 -

G Mass concrete infill in column foundation between 22 m3 -


tie-beam

BILL NO.02 7 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

H In Steps 2 m3 -

J In planter upstands 3 m3 -

REINFORCEMENT
K High yield strength deformed bar reinforcement with 20,765 Kg -
BS 4449,BS 4461 ,BS4483 and cut and bent to BS
4466 minimum characteristic strength of 460N/mm2

BILL NO.02 8 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

BRC -A 142 Mesh fabric reinforcement including


laps,Fixed horizontally to
L Ground slab 577 m2 -

FORMWORK
M To Sides of Foundations 191 m2 -

BILL NO.02 9 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

N To Sides of Column 114 m2 -

P To tie-beams 435 m2 -

BILL NO.02 10 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Q To Sides of Steps 8 m2 -

R To Sides of wall 152 m2 -

Carried to General Summary Page 2 -

BILL NO.02 11 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

CONCRETE WORK (Cont'd)

SUB STRUCTURE (Cont'd)


SUNDRIES

A 20mm thick Flexcell Board or other equal and


approved compressible filler between concrete
surfaces at expansion joints/construction joints. 1 Item -

B Pointing 20mm wide x 20mm deep with approved


mastic sealant 1 Item -

BILL NO.02 12 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Solid Concrete Block work for the substructure walls


C 200mm thick Substructure walls 171 m2 -

Substructure waterproofing works


D 1000 gauge protection layer below sub-structure 985 m2 -

E Two coats of Bitumen emulsion paint for the 1220 m2 -


horizontal & vertical faces of of substructure

F Vertical Faces to be protected with one layer of 650 m2 -


fibre board

BILL NO.02 13 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Swimming Pool

G Single Layer PVC menmrane 2.2mm thk with 140 m2 -


damage indicating signal layer, double seam weld
to allow pressure testing

H 320mm wide 2.3mm thk PVC water stop W4 35 m -

J Slip membrane superior needle punched nonwoven 140 m2 -


geotextile specific weight 370g/3 virging
polypropylene for vertical & horizontal areas

K Flexible re-injectable PVC hose system 19mm 35 m -


nominal outside diameter , 6mm nominal inside
diameter, complete with all junctions

BILL NO.02 14 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 3 -

BILL NO.02 15 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

CONCRETE WORK (Cont'd)


SUPER STRUCTURE
Reinforced Ordinary Portland Cement Concrete
Grade 40 /20
A In Columns 30 m3 -

B In solid slab, 250mm thick 316 m3 -

C In Beams 8 m3 -

BILL NO.02 16 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

D In Walls 12 m3 -

E In planter boxes& upstand 3 m3 -

BILL NO.02 17 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

F In parapet walls 82 m3 -

G In Staircase 5 m3 -

H In stiffner beams 3 m3 -

BILL NO.02 18 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

J In stiffner columns 3 m3 -

REINFORCEMENT
K High yield bar reinforcement with minimum 44,490 kg -
characteristic strength of 460N/mm2

BILL NO.02 19 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

FORMWORK
L To sides of columns 403 m2 -

M To sides and soffits of solid slabs 1290 m2 -

BILL NO.02 20 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

N To sides and soffits of beams 55 m2 -

P To sides of walls 115 m2 -

R To sides of planter box & upstand 15 m2 -

BILL NO.02 21 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

S To sides of parapet wall 702 m2 -

T To Sloping soffits of staircase and landing 26 m2 -

BILL NO.02 22 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

U To stiffner beams beams 30 m2 -

V To stiffner beams columns 30 m2 -

Carried to General Summary Page 4 -

BILL NO.02 23 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

CONCRETE WORK (Cont'd)


SUPER STRUCTURE(Cont'd)

Insitu concrete lintel including formwork, reinforcement


A 100 x 200 mm lintels 22 m -

BILL NO.02 24 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

B 200 x 200 mm lintels 58 m -

BILL NO.02 25 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

C 200 x 250 mm lintels 37 m -

BILL NO.02 26 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

D Machine foundations at roof floor 1 Item -

BILL NO.02 27 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

E Extra Over to the concrte works allow for concrete 1 Item -


parapet projections, window projections, etc.

BILL NO.02 28 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 5 -

BILL NO.02 29 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

MASONRY WORKS

Masonry Block walls


A 250mm block work, External Thermal block walls 612 m2 -

B 200mm thick; Internal Hollow block walls 723 m2 -

C 100mm thick; Internal walls 296 m2 -

BILL NO.02 30 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

D Damp proof course, under blockwalls, internal and 590.00 m -


external walls

BILL NO.02 31 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 6 -

BILL NO.02 32 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

THERMAL & MOISTURE PROTECTION

Wet area waterproofing


A Toilets & Balconies 343 m2 -

Roof Waterproofing
B Light weight concrete laid to slope 562 m2 -

C Torch applied 4mm thk waterproofing membrane 562 m2 -

D Torch applied 4mm thk waterproofing membrane 170 m2 -


skirting

E 20 mm thk cement sand mortar 562 m2 -

BILL NO.02 33 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

F Non-weven polypropylene mesh 562 m2 -

G Polystyerene rigid insulation 562 m2 -

H 50mm high density extruded 562 m2 -

J 300x300x30mm White cement tiles 562 m2 -

K Dressing around pipes & Natural gravel 4 m2 -

L Thermal Insulation for super structure as per DM 1 LS -


regulations

BILL NO.02 34 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 7 -

BILL NO.02 35 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

NON STRUCTURAL METAL WORK

Wrought Iron Railing

A Wrought railing for balcony 24 m

B Staircase Handrailing 13 m Included in the

Bill No.06
C Void area railing 2 m Provisional Sum

D G.I. Powder coated Cat ladder 1.00 Nos.

BILL NO.02 36 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 8 -

BILL NO.02 37 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

WOOD WORK

A Wooden pergola as shown on drawing : Overall 1 Item Not Applicable


size; 6.025x2.70 m

B Wooden Trellis, stained and varnished finish: 1 Item Not Applicable


Overall size; 14.20x2.50m

WARDROBES ( Excluding Ironmongeries,


covered under Provisional Sum)
Int. white melamine finish & Ext. Mahogany finish

C For Changing Room - 1.225x2.60x0.60 m 1 No -

D For Maid's Room - 1.60x2.60x0.60 m 1 No -

E For Guest Room - 3.34x2.60x0.60 m 1 No -

BILL NO.02 38 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

F For Guest Room - 2.10x2.60x0.60 m 1 No -

G For Guest Room - 1.00x2.60x0.60 m 1 No -

H Master bed room - 4.10x2.60x0.60 m 2 No -

J Master bed room - 2.30x2.60x0.60 m 1 No -

K Master bed room - 5.17x2.60x0.60 m 1 No Included in the

Bill No.06
L Master bed room - 4.10x2.60x0.60 m 1 No Provisional Sum

M Master bed room - 2.30x2.60x0.60 m 1 No -

BILL NO.02 39 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

N Bed room 2 Dressing- 2.40x2.60x0.60 m 2 No -

O Bed room 2 Dressing- 2.80x2.60x0.60 m 1 No -

P Bed room 3 Dressing- 2.30x2.60x0.60 m 2 No -

Q Bed room 3 Dressing- 2.50x2.60x0.60 m 1 No -

R Bed room 4 Dressing- 4.00x2.60x0.60 m 1 No -

S Bed room 4 Dressing- 2.50x2.60x0.60 m 2 No -

BILL NO.02 40 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 9 -

BILL NO.02 41 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

WODD WORK…./

KITCHEN CABINET ( Excluding Ironmongeries,


cever under Provisional Sum)

Int. white plastic laminated finish & pvc lipping Ext.


stained wood veneer finish

A Kitchen base Unite + Wall units 1 LS Included in the

Bill No.06
Provisional Sum

Bill No.06
Provisional Sum
PANTRY UNIT ( Excluding Ironmongeries,
cever under Provisional Sum)
Stained wood veneer finish
G Pantry Base unit + Wall Units 1 LS

BILL NO.02 42 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 10 -

BILL NO.02 43 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

DOORS AND WINDOWS

TIMBER DOORS ( Excluding Ironmongeries,


cever under Provisional Sum)

A Type - D1, Single leaf Timber door 1 No

B Type D2, Single leaf Timber door 8 No

C Type D3, Single leaf Timber door 2 No

D Type D4, Single leaf Timber door 9 No Included in the

Bill No.06
E Type D5, Double leaf 2hrs fire rated Timber door 1 No Provisional Sum

BILL NO.02 44 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

F Type D6, Single leaf 2hrs fire rated Timber door 6 No


with wired vision panel

G Type D7, Double leaf 2hrs fire rated Timber door 1 No


with wired vision panel

BILL NO.02 45 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 11 -

BILL NO.02 46 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

FINISHES
INTERNAL FINISHES
INTERNAL BACKGROUNDS

A 50mm thick cement sand screed to receive final floor 1140 m2 -

B 15mm thick cement and sand plaster to the internal w 2966 m2 -

C 15mm th cement sand plaster to soffit of the slabs 1290 m2 -

BILL NO.02 47 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

FLOOR FINISH
D Marble & Granite combination on floor (Allow a PC 26.00 m2 -
rate of - Dhs. 450/m2 for supply of Marble /
Granite) - MR / GR1

E Supply and fixing of to 20mm thick Granite, cut to 242.00 m2 -


size, laid in matching colours form geometrical
pattern on floor (Allow a PC rate of - Dhs. 450/m2
for supply of Granite) - GR1

BILL NO.02 48 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

F Supply and fixing of to 20mm thick Marble, cut to 19.00 m2 -


size, laid in matching colours form geometrical
pattern on floor (Allow a PC rate of - Dhs.
450/m2 for supply of Marble) - MR1

G Supply and fixing of 200x200x7mm unglazed 94.00 m2 -


ceramic tile with matching colour epoxy grout.
(Allow a PC rate of - Dhs. 50/m2 for supply of
Ceramic) - CT-1

BILL NO.02 49 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

H Supply and fixing of 300x300/400x400x8mm 710.00 m2 -


unglazed ceramic tile (heavy Duty) with matching
colour epoxy grout. (Allow a PC rate of - Dhs.
60/m2 for supply of Ceramic) - CT-3

J Supply and installation of wooden floor. (Allow a 22.00 m2 -


PC rate of - Dhs. 400/m2 for supply &
Installation of wooden floor including wastage) -
WD-4

BILL NO.02 50 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

K Granite Tread & Riser to the main staircase. (Allow 41.00 m -


a PC rate of Dhs. 450/= per Rm )

L Granite tiles to the landing of the staircase. (Allow 7.00 m2 -


a PC rate of Dhs. 450/m2 for supply of granite)

Carried to General Summary Page 12 -

BILL NO.02 51 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

FINISHES../
INTERNAL FINISHES…/
WALL FINISH
A Supply and fixing of 200x200/ 200x300x6 mm 376.00 m2 -
glazed ceramic tile matching with epoxy grout. (PC
rate for supply - Dhs. 50/m2) CT-2

B Supply and fixing of 25x25mm glass mosaic tile 310.00 m2 -


fixed with adhesive on smooth sand plaster. (PC
rate for supply - Dhs. 100/m2). WF-4

BILL NO.02 52 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

C Supply and apply Paint finish Paint - Type P1, to 1,113.00 m2 -


the cement sand plastered walls CP-2 (measured
seperately).

D Supply and apply Paint finish Paint - Type P3, to 30.00 m2 -


the cement sand plastered walls CP-3 (measured
seperately).

E Supply and apply the washable emulsion paint 120.00 m2 -


-WF2a

F Supply and apply the washable emulsion paint 522.00 m2 -


(decorative application)-(PC rate for Supply &
Apply Dhs. 20/m2)- WF2b

SKIRTING FINISH
G 100mm high ceramic tile skirting match the floor - 313.00 m -
(PC rate for supply - Dhs. 15/m) - CT-5

BILL NO.02 53 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

H 10mm thick 100mm high marble skirting to match 19.00 m -


floor(PC rate for supply - Dhs. 125/m) - MR-3

J 100mm high wooden (WD3-Beach wood) skirting 19.00 m -


stained and w/clear polyrethene paint to match
Engineer's sample. (PC rate for supply & fix -
Dhs. 100/m) - WD-2

BILL NO.02 54 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

K 10mm thick 100mm high granite skirting to the stair 28.00 m -


matching to the tread and riser (PC rate for supply
- Dhs. 100/m)

Thresholds
K 100 mm wide; 30mm thick Marble threshold to 9.00 m -
match with the floor colour (PC rate for supply -
Dhs. 100/m)

BILL NO.02 55 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

L 200mm-300mm Wide; 30mm thick Marble threshold 18.00 m -


to match with the floor colour (PC rate for supply -
Dhs. 200/m)

Carried to General Summary Page 13 -

BILL NO.02 56 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

FINISHES../
INTERNAL FINISHES…/

Ceiling Finishes (Covered under Provisional


sum Item)
A Supply and fix suspended gypsum board ceiling 360.00 m2
with painted. Paint type P1. Ceiling Type - SC1

B Supply and fix suspended12.5mm thick water 120.00 m2


resistance gypsum board ceiling with painted. Paint
type P2. Ceiling Type - SC2

C Supply and fix 600 x 600 mm. Suspended Baked 130.00 m2


Enamel Aluminium tiles with exposed spline. SC3

Included in the
D Supply and fix suspended12.5mm thick gypsum 5.00 m2 Bill No.06
board ceiling with painted. Paint type P3. Ceiling Provisional Sum
Type - SC4

E Supply & fixing of 600X600X6 mm Thk. Suspended 24.00 m2


Calcium Silicate Vinyl Faced Tile On Exposed Grid -
SC6

BILL NO.02 57 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

F Gypsum Bulk Head 200mm and above 272.00 m

G Gypsum Bulk Head (50mm) 181.00 m

H Gypsum Decorative Cornice 137.00 m

J Supply and apply the paint type of the paint Type 21.00 m2 -
P2.- to cement sand plaster(measured seperately)
CP-2

K Supply and apply the paint type of the paint Type 375.00 m2 -
P1.- to cement sand plaster (measured seperately)
CP-1

BILL NO.02 58 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 14 -

BILL NO.02 59 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

EXTERNAL FINISHES

BACKGROUNDS
Walls
A 20mm thick Cement and sand plaster to external wal 1200 m2 -

including returns, reveals of openings or recesses ; to

B Extra Over to the extrenal plaster, plaster grooves 1 Item -

FINISHES
C EF 3 - Stone rendering exterior wall finish. (PC rate 429 m2 -
for Dhs. 100/m2 for Supply and apply of Stone
rendering including 20mm x 4mm Horizontal &
Vertical grooves)

D EF 5 - Epoxy Paint Finish to the plastered walls 726 m2 -

BILL NO.02 60 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

E Extra Over for the EF-6 (Epoxy paint finish/ Paint 1 Item -
Type 3) for the parapet top detail, projections, etc.

F EF 7 - Supply and fixing of 20mmthick marble 20 m2 -


cladding rubble finish as per the elevation details.
(PC rate of Dhs. 550/m2 for Supply & Fix of
Marble)

Carried to General Summary Page 15 -

BILL NO.02 61 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

GENERAL SUMMARY

A -

D -

E -

F -

J -

BILL NO.02 62 / 64
G+1 Villa for Mr. Abdul Ghaffar Mohd. Al Hashimi Contract B.O.Q.

BILL No.2 - MAIN VILLA (CIVIL WORKS)

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

MAIN VILLA SUMMARY -

BILL NO.02 63 / 64

Anda mungkin juga menyukai