Anda di halaman 1dari 18

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.

SITE WORK
Earth Works
A Shoring & De-watering works 1 Item Included in Bill
No.06
Provisional Sum

B Site clearence 1 Item Included in


below Item

General excavation
C Excavation for Foundations 317 m3 -

D Cart away surplus excavated material to government 190 m3 Included in Bulk


specified location (provisional quantity ) Excavation

Anti-termite Treatment
E Anti-termite Treatment 130 m2 -

BILL NO.03 1 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 1 -

BILL NO.03 2 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

CONCRETE WORK

SUB STRUCTURE

IN SITU CONCRETE

Plain poured concrete - SRC 30/20


A 50mm thick Blinding 9 m3 -

Reinforced Sulphate Resistant Cement Concrete Grade


40 /20
B In Raft slab 36 m3 -

C In Column 3 m3 -

D In walls 40 m3 -

E In ground floor slab 22 m3 -

F In Stairway 2 m3 -

REINFORCEMENT
G High yield strength deformed bar reinforcement with BS 11,850 Kg -
4449,BS 4461 ,BS4483 and cut and bent to BS 4466
minimum characteristic strength of 460N/mm2

FORMWORK
H To Sides of Foundations 21 m2 -

J To Sides of Column INCLUDED IN WALLS

K To Stairway 12 m2 -

L To Sides of wall 323 m2 -

M To sides and soffits of solid slabs 87 m2 -

BILL NO.03 3 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 2 -

BILL NO.03 4 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

CONCRETE WORK (Cont'd)

SUB STRUCTURE (Cont'd)


SUNDRIES

Substructure waterproofing works


A 1000 gauge protection layer below sub-structure 90 m2 -

B Single Layer PVC menmrane 2.2mm thk with damage 240 m2 -


indicating signal layer, double seam weld to allow
pressure testing

C 320mm wide 2.3mm thk PVC water stop W4 47 m -

D Slip membrane superior needle punched nonwoven 240 m2 -


geotextile specific weight 370g/3 virging polypropylene
for vertical & horizontal areas

E Flexible re-injectable PVC hose system 19mm nominal 47 m -


outside diameter , 6mm nominal inside diameter,
complete with all junctions

F Screed for the protection of Horizontal faces 90 m2 -

G Vertical Faces to be protected with one layer of fibre 136 m2 -


board

BILL NO.03 5 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 3 -

BILL NO.03 6 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

CONCRETE WORK (Cont'd)

SUPER STRUCTURE

Reinforced Ordinary Portland Cement Concrete Grade


40 /20
A In Columns 4 m3 -

B In solid slab, 250mm thick 22 m3 -

C In Beams 3 m3 -

D In parapet walls 3 m3 -

REINFORCEMENT
E High yield bar reinforcement with minimum 3,100 kg -
characteristic strength of 460N/mm2

FORMWORK
F To sides of columns 38 m2 -

G To sides and soffits of solid slabs 87 m2 -

H To sides and soffits of beams 38 m2 -

J To sides of parapet wall 26 m2 -

Insitu concrete lintel including formwork, reinforcement


K 100 x 200 mm lintels 3 m -

L 200 x 200 mm lintels 4 m -

BILL NO.03 7 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 4 -

MASONRY WORKS

Masonry Block walls


A 250mm block work, External Thermal block walls 116 m2 -

B 150mm thick; Internal Hollow block walls 30 m2 -

C 100mm thick; Internal walls 20 m2 -

D Damp proof course, under blockwalls, internal and 35.00 m -


external walls

BILL NO.03 8 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 5 -

THERMAL & MOISTURE PROTECTION

Wet area waterproofing


A Toilets & Balconies 4 m2 -

Roof Waterproofing
B Light weight concrete laid to slope 73 m2 -

C Torch applied 4mm thk waterproofing membrane 73 m2 -

D Torch applied 4mm thk waterproofing membrane skirting 37 m2 -

E 20 mm thk cement sand mortar 73 m2 -

F Non-weven polypropylene mesh 73 m2 -

G Polystyerene rigid insulation 73 m2 -

H 50mm high density extruded 73 m2 -

J 300x300x30mm White cement tiles 73 m2 -

K Dressing around pipes & Natural gravel 1 m2 -

GRP Lining
L GRP Lining for the water tank 114 m2 -

BILL NO.03 9 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

M Allow for thermal insulation for super-structure as per 1 LS -


DM regulations

Carried to General Summary Page 6 -

METAL WORK / ACCESSORIES

Wrought Iron Railing (Covered under the


Provisional Item)

A Stairway Handrailing 14 m
Included in the
Bill No.06
B GRP Access Ladder & Hatch 1 LS Provisional Sum

BILL NO.03 10 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 7 -

WOOD WORK

WARDROBES (Excluding Ironmongery, covered


under Provisional Sum)
Int. white melamine finish & Ext. Mahogany finish
A For Watchman Room - 1.40x2.60x0.60 mm 1 Item

Included in the
DOORS AND WINDOWS Bill No.06
Provisional Sum

BILL NO.03 11 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

TIMBER DOORS (Excluding Ironmongery, covered


under Provisional Sum)
B Type - D1, Single leaf Timber door 1 No

C Type D4, Single leaf Timber door 1 No

Carried to General Summary Page 8 -

BILL NO.03 12 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

FINISHES
INTERNAL FINISHES

INTERNAL BACKGROUNDS

A 50mm th. cement sand screed to receive final floor finish 150 m2 -

B 15mm thick cement and sand plaster to the internal walls 212 m2 -

C 15mm th cement sand plaster to soffit of the slabs 150 m2 -

FLOOR FINISH
D Supply and fixing of 200x200x7mm unglazed ceramic 4.00 m2 -
tile with matching colour epoxy grout. (Allow a PC rate
of - Dhs. 40/m2 for supply of Ceramic) - CT-1

E Supply and fixing of 300x300/400x400x8mm unglazed 60.00 m2 -


ceramic tile (heavy Duty) with matching colour epoxy
grout. (Allow a PC rate of - Dhs. 40/m2 for supply of
Ceramic) - CT-3

F Pre-Cast Terrazzo Tread & Riser to the staircase. 24.00 m -


(Allow a PC rate of Dhs. 150/Rm for supply of
Terrazzo) TR-3

G 300 x 300 x 30 mm Terrazzo Tiles to the landing of the 2.00 m2 -


staircase. (Allow a PC rate of Dhs. 50/m2 for supply
of Terrazzo) TR-1

WALL FINISH
H Supply and fixing of 200x200/ 200x300x6 mm glazed 27.00 m2 -
ceramic tile matching with epoxy grout. (PC rate for
supply - Dhs. 40/m2) CT-2

J Supply and apply Paint finish Paint - Type P1, to the 59.00 m2 -
cement sand plastered walls CP-2 (measured
seperately).

K Supply and apply the washable emulsion paint 147.00 m2 -


(decorative application)-WF2b

SKIRTING FINISH
L 100mm high ceramic tile skirting match the floor -(PC 17.00 m -
rate for supply - Dhs. 15/m) - CT-5

BILL NO.03 13 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Thresholds
M 100 mm wide; 30mm thick Marble threshold to match 1.00 m -
with the floor colour (PC rate for supply - Dhs. 100/m)

Carried to General Summary Page 9 -

BILL NO.03 14 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

FINISHES../
INTERNAL FINISHES…/

Ceiling Finishes (Covered under the Provisional


Sum Item)
A Supply and fix suspended gypsum board ceiling with 17.00 m2
painted. Paint type P1. Ceiling Type - SC1 Included in the
Bill No.06
B Supply and fix suspended12.5mm thick water 4.00 m2 Provisional Sum
resistance gypsum board ceiling with painted. Paint type
P2. Ceiling Type - SC2

BILL NO.03 15 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 10 -

EXTERNAL FINISHES

BACKGROUNDS
Walls
A 20mm thick Cement and sand plaster to external walls 282 m2 -

FINISHES
B EF 5 - Supply and apply Paint finish Paint - Type P3, to 282.00 m2 -
the cement sand plastered walls CP-3 (measured
seperately).

C EF 10 - Plaster grooves extra over to the External 1 LS -


Plaster

BILL NO.03 16 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

Carried to General Summary Page 11 -

GENERAL SUMMARY

SERVICE BLOCK

A SITE WORKS -

C -

D -

E -

F -

G -

BILL NO.03 17 / 18
ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

J -

SERVICE BLOCK SUMMARY CARRIED TO GRAND SUMMARY -

BILL NO.03 18 / 18

Anda mungkin juga menyukai