JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Reading of water level in standpipe at operating pressure using Ist attempt 2nd attempt
aggregate in the same proportions as that of grade of concrete under
test (%) H1
0.8 0.9
Reading of water level in standpipe after releasing operating
pressure using aggregate in the same proportions as that of grade of
concrete under test (%) H2 0.7 0.7
Sign : Sign :
Date : Date :
PL/CTP-11/Lab/788
21.02.2018
27.02.2018
jointly
Concrete
Average
0.85
0.7
0.15
1.2
0.1
1.1
EXPRESS FREIGHT RAILWAY CONSORTIUM
CIVIL,BUILDING AND TRACK WORKS,CONTRACT PACKAGE CTP-11
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Reading of water level in standpipe at operating pressure using Control mix Admixture mix
aggregate in the same proportions as that of grade of concrete under
test (%) H1
0.8 0.8
Reading of water level in standpipe after releasing operating
pressure using aggregate in the same proportions as that of grade of
concrete under test (%) H2 0.4 0.4
Name : Name :
Sign : Sign :
Date : Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
CIVIL,BUILDING AND TRACK WORKS,CONTRACT PACKAGE CTP-11
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Reading of water level in standpipe at operating pressure using Ist attempt 2nd attempt
aggregate in the same proportions as that of grade of concrete under
test (%) H1
3.4 0.9
Reading of water level in standpipe after releasing operating
pressure using aggregate in the same proportions as that of grade of
concrete under test (%) H2 0.4 0.7
Sign : Sign :
Date : Date :
PL/CTP-11/Lab/788
21.02.2018
27.02.2018
jointly
Concrete
Average
2.15
0.55
1.6
1.75
0.3
1.45
EXPRESS FREIGHT RAILWAY CONSORTIUM
CIVIL,BUILDING AND TRACK WORKS,CONTRACT PACKAGE CTP-11
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Reading of water level in standpipe at operating pressure using Ist attempt 2nd attempt
aggregate in the same proportions as that of grade of concrete under
test (%) H1
3.4 0.9
Reading of water level in standpipe after releasing operating
pressure using aggregate in the same proportions as that of grade of
concrete under test (%) H2 0.4 0.7
Sign : Sign :
Date : Date :
/TPL/CTP-11/Lab/
15.06.2018
jointly
Concrete
Average
2.15
0.55
1.6
1.75
0.3
1.45
EXPRESS FREIGHT RAILWAY CONSORTIUM
CIVIL,BUILDING AND TRACK WORKS,CONTRACT PACKAGE CTP-11
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Source of Material Concrete M-25 Grade with 1.6% admixture Date of Testing 21.06.2018
Air content Determination Control mix Admixture mix Control mix Admixture mix
Air content in freshly mixed concrete (A)= (A1-G) (%) 1.250 1.250 1.188 0.938
Name : Name :
Sign : Sign :
Date : Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
CIVIL,BUILDING AND TRACK WORKS,CONTRACT PACKAGE CTP-11
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Reading of water level in standpipe at operating pressure using Control mix Admixture mix
aggregate in the same proportions as that of grade of concrete under
test (%) H1
12 12
Reading of water level in standpipe after releasing operating
pressure using aggregate in the same proportions as that of grade of
concrete under test (%) H2 1 1
Air content in freshly mixed concrete (A)= (A 1-G) (%) 1.1875 1.2500
Name : Name :
Sign : Sign :
Date : Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
CIVIL,BUILDING AND TRACK WORKS,CONTRACT PACKAGE CTP-11
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Name : Name :
Sign : Sign :
Date : Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
CIVIL,BUILDING AND TRACK WORKS,CONTRACT PACKAGE CTP-11
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Source of Material Concrete M-25 Grade with 1.6% admixture Date of Testing 21.06.2018
Air content Determination Control mix Admixture mix Control mix Admixture mix
Air content in freshly mixed concrete (A)= (A1-G) (%) 1.250 1.251 1.188 1.190
EFRC Representative
Name : Name :
Sign : Sign :
Date : Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
CIVIL,BUILDING AND TRACK WORKS,CONTRACT PACKAGE CTP-11
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Source of Material Concrete M-35 Grade with 1.4% admixture Date of Testing 01.02.2019
Air content Determination Control mix Admixture mix Control mix Admixture mix
Air content in freshly mixed concrete (A)= (A1-G) (%) 0.313 0.375 0.250 0.375
EFRC Representative
Name : Name :
Sign : Sign :
Date : Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
CIVIL,BUILDING AND TRACK WORKS,CONTRACT PACKAGE CTP-11
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Source of Material Concrete M-35 Grade with 1.4% admixture Date of Testing 01.02.2019
Air content Determination Control mix Admixture mix Control mix Admixture mix
Air content in freshly mixed concrete (A)= (A1-G) (%) 0.313 0.500 0.438 0.500
EFRC Representative
Name : Name :
Sign : Sign :
Date : Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
CIVIL,BUILDING AND TRACK WORKS,CONTRACT PACKAGE CTP-11
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Source of Material Concrete M-40 Grade with 1.050% Admixture Date of Testing 10.04.2019
Air content Determination Control mix Admixture mix Control mix Admixture mix
Air content in freshly mixed concrete (A)= (A1-G) (%) 0.125 0.438 0.188 0.500
Name :
Name :
Sign :
Sign :
Date :
Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Source of Material Concrete M-55 Grade For PSC Girder with 1.20% Admixture Date of Testing 18.05.2019
Air content Determination Control mix Admixture mix Control mix Admixture mix
Air content in freshly mixed concrete (A)= (A1-G) (%) 0.250 0.438 0.500 0.625
Name :
Name :
Sign :
Sign :
Date :
Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Source of Material Concrete M-35 Grade with 1.20% Admixture Date of Testing 10.06.2019
Air content Determination Control mix Admixture mix Control mix Admixture mix
Air content in freshly mixed concrete (A)= (A1-G) (%) 0.500 0.625 0.688 0.750
Name :
Name :
Sign :
Sign :
Date :
Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Source of Material Concrete M-35 Gradewith 1.30% Admixture & ACC Cement Date of Testing 19.06.2019
Air content Determination Control mix Admixture mix Control mix Admixture mix
Air content in freshly mixed concrete (A)= (A1-G) (%) 0.375 0.500 0.563 0.625
Name :
Name :
Sign :
Sign :
Date :
Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Type of Material TP Buildtech Aqualoc 350L (Balajee crusher Aggregate) Date of Sampling 03.07.2019
Source of Material Concrete M-35 Gradewith 1.20% Admixture, Pawne plant Date of Testing 03.07.2019
Air content Determination Control mix Admixture mix Control mix Admixture mix
Air content in freshly mixed concrete (A)= (A1-G) (%) 0.375 0.500 0.438 0.625
Name :
Name :
Sign :
Sign :
Date :
Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Source of Material Concrete M-55 Grade with 1.10% Admixture Date of Testing 18.07.2019
Air content Determination Control mix Admixture mix Control mix Admixture mix
Air content in freshly mixed concrete (A)= (A1-G) (%) 0.438 0.563 0.625 0.750
Name :
Name :
Sign :
Sign :
Date :
Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Source of Material Concrete M-55 Grade with 1.10% Admixture Date of Testing 24.07.2019
Air content Determination Control mix Admixture mix Control mix Admixture mix
Air content in freshly mixed concrete (A)= (A1-G) (%) 0.375 0.500 0.563 0.750
Name :
Name :
Sign :
Sign :
Date :
Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Type of Material Admixture Aqualoc TP 3Z5 +Ultratech Cement Date of Sampling 16.08.2019
Source of Material Concrete M-35 Grade with 1.25% Admixture Date of Testing 16.08.2019
Air content Determination Control mix Admixture mix Control mix Admixture mix
Air content in freshly mixed concrete (A)= (A1-G) (%) 0.250 0.500 0.438 0.688
Name :
Name :
Sign :
Sign :
Date :
Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Type of Material Admixture Aqualoc TP 3Z5 +Ultratech Cement Date of Sampling 06.09.2019
Air content Determination Control mix Admixture mix Control mix Admixture mix
Air content in freshly mixed concrete (A)= (A1-G) (%) 0.438 0.688 0.500 0.750
Name :
Name :
Sign :
Sign :
Date :
Date :
EXPRESS FREIGHT RAILWAY CONSORTIUM
JNPT- VAITARANA
Project : Civil, Building & Track work for 103 Km Double Railway line.
Type of Material Admixture Aqualoc TP 3Z5 + ACC Cement Date of Sampling 11.09.2019
Air content Determination Control mix Admixture mix Control mix Admixture mix
Air content in freshly mixed concrete (A)= (A1-G) (%) 0.438 0.688 0.563 0.750
Name :
Name :
Sign :
Sign :
Date :
Date :