This risk assessment worksheet summarizes the risks, controls, and action plan for land clearing activities at a mining site. It identifies hazards such as falling branches from decaying trees and potential incidents like being struck. The risks are ranked as high initially but can be reduced to medium with controls like using an excavator equipped with protective structures to remove decaying trees. The action plan includes completing the excavator with a falling object protective structure and protective cover for the front by December 25th, and developing a job safety environmental analysis for tree felling with an excavator by December 31st.
This risk assessment worksheet summarizes the risks, controls, and action plan for land clearing activities at a mining site. It identifies hazards such as falling branches from decaying trees and potential incidents like being struck. The risks are ranked as high initially but can be reduced to medium with controls like using an excavator equipped with protective structures to remove decaying trees. The action plan includes completing the excavator with a falling object protective structure and protective cover for the front by December 25th, and developing a job safety environmental analysis for tree felling with an excavator by December 31st.
This risk assessment worksheet summarizes the risks, controls, and action plan for land clearing activities at a mining site. It identifies hazards such as falling branches from decaying trees and potential incidents like being struck. The risks are ranked as high initially but can be reduced to medium with controls like using an excavator equipped with protective structures to remove decaying trees. The action plan includes completing the excavator with a falling object protective structure and protective cover for the front by December 25th, and developing a job safety environmental analysis for tree felling with an excavator by December 31st.
Section Activity Hazards Potential Incident L C Controls L C Actions By Who When Ranking Checks Risk
Mining Land Clearing
1. Pembersihan dg Cabang pohon Tertimpa cabang B 5 Extrim Gunakan unit Excavator utk Periksa semua C 3 High Lengkapi Excavator dg Falling Abc 25 Des'04 alat berat lapuk pohon lapuk yg jatuh merobohkan Pohon yg kondisi excavator Object Protective Structure lapuk sebelum digunakan (FOPS) serta bagian depan untuk land clearing unit dilengkapi protector
Susun JSEA penumbangan Def 31 Des '04
Pohon dengan Excavator
2. Pembersihan dg Chainsaw
ATTENDEES: Abc, Def, Ghi, Jkl, Mno, Pqr, Stu
PT. Thiess Contractors Indonesia Page 1 of 1 TCI-HSE-SF518/A0