REKAPITULASI DAFTAR KUANTITAS DAN HARGA

Unit Kerja : Dinas Kimpraswil Kota Banjarbaru


Kegiatan : Pembangunan Gedung/ Kantor Kota Banjarbaru
Pekerjaan : Pembangunan Gedung DPRD Kota Banjarbaru
No. Paket : 01 (satu)
Lokasi : Banjarbaru

NO. URAIAN PEKERJAAN JUMLAH HARGA

1 2 3
A. BANGUNAN UTAMA
I PEKERJAAN PERSIAPAN Rp. 84,060,000.00
II PEKERJAAN TANAH, PASIR, GALAM Rp. #VALUE!
III PEK. PAS.BATU, BATA Rp. 924,740,730.68
IV PEK. BETON BERTULANG Rp. #VALUE!
V PEKERJAAN KAP/ATAP, PLAFOND Rp. 241,343,743.71
VI PEK. KUSEN, PINTU, JENDELA/VENTILASI DAN PERLENGKAPAN PINTU Rp. 66,589,800.00
VII PEK. INSTALASI AIR / SANITAIR Rp. -
VIII PEK. CAT-CATAN, LAIN-LAIN Rp. 6,334,101,544.11
TOTAL A Rp. #VALUE!
B. FASILITAS PENUNJANG
I PEK. INSTALASI LISTRIK Rp. -
II PEK. INSTALASI PENANGKAL PETIR Rp. -
TOTAL B Rp. -

C. TOTAL HARGA (A+B) Rp. #VALUE!


D. DIBULATKAN Rp. #VALUE!

Err:511

Banjarmasin, 05 Juni 2006


PT. Adiquatro Elektrikindo Perkasa

Djunaidi Limbong
Direktur
DAFTAR KUANTITAS DAN HARGA

Unit Kerja : Dinas Kimpraswil Kota Banjarbaru


Kegiatan : Pembangunan Gedung/ Kantor Kota Banjarbaru
Pekerjaan : Pembangunan Gedung DPRD Kota Banjarbaru
No. Paket : 01 (satu)
Lokasi : Banjarbaru
Satuan

Harga Satuan Jumlah


No. Uraian Pekerjaan Analisa Volume
1 2 3 4 5 6(Rp.) 7 (Rp.)

A BANGUNAN UTAMA
I PEKERJAAN PERSIAPAN
1 Direksi Keet - m2 64.00 100,000.00 6,400,000.00
2 Izin Mendirikan Bangunan (IMB) - ls 1.00 50,000,000.00 50,000,000.00
3 Pembersihan lahan / lokasi bangunan - m2 2,304.00 6,510.42 15,000,000.00
4 Pengukuran / pasang bouwplank - m' 172.00 14,534.88 2,500,000.00
5 Pembuatan pagar pengaman proyek + papan nama proyek - ls 1.00 5,160,000.00 5,160,000.00
6 Mobilisasi dan Demobilisasi - ls 1.00 5,000,000.00 5,000,000.00
Jumlah 84,060,000.00
II PEKERJAAN TANAH, PASIR, GALAM
1 Galian tanah pondasi batu kali & poer A.1 m3 976.72 #VALUE! #VALUE!
2 Urugan tanah kembali 1/3.A.1 m3 245.27 #VALUE! #VALUE!
3 Pasir urug bawah pondasi, lantai, rabat A.18 m3 458.04 50,700.00 23,222,628.00
4 Tanah urug bawah lantai A.16 m3 728.70 38,575.00 28,109,602.50
5 Tongkat kayu galam diameter 8-10 pj 5 m - bj 11,558.00 5,000.00 57,790,000.00
6 Galam perancah pj 2 m - bj 18,904.00 1,500.00 28,356,000.00
Jumlah #VALUE!
III PEK. PAS.BATU, BATA
1 Pasangan batu kosong - m3 84.37 135,000.00 11,389,950.00
2 Pasangan batu kali camp. 1:4 G.32h+G.26 m3 205.28 403,909.20 82,914,480.58
3 Lantai kerja camp. 1:3:5 (dibawah poer) G.43.a m3 6.51 486,610.00 3,167,831.10
4 Lantai / raam kend.beton tumbuk tebal 7 cm camp. 1:3:6 G.67 m2 1,139.75 249,000.00 283,797,750.00
Rabat beton cor tebal 5 cm camp. 1:3:6 G.67 m2 269.20 348,600.00 93,843,120.00
5 Rollag/Trasraam/Pasangan dinding batu bata 1:2 G.33m+G.27 m3 63.86 636,838.00 40,668,474.68
6 Plesteran Camp. 1:2 tebal 15 mm - m2 502.53 20,000.00 10,050,600.00
7 Pasangan dinding batu bata camp. 1:4 G.33+G.27/m3 m3 426.79 571,157.00 243,764,096.03
8 Plesteran dinding bata tebal 15 mm camp. 1:4 G.50q+G.48/m2 m2 6,952.13 22,316.10 155,144,428.29
Jumlah 924,740,730.68
IV PEK. BETON BERTULANG
1 Plat poer (190 kg/ m3) G.sup.i m3 60.75 3,175,700.00 192,923,775.00
2 Sloof 25/30 (290 kg/ m3) G.sup.i m3 30.00 4,300,700.00 129,021,000.00
3 Sloof 40/50 (160 kg/ m3) G.sup.i m3 62.30 2,838,200.00 176,819,860.00
4 Kolom 50x50, 40x40, dia.40, dia.30 (210 kg/ m3) G.sup.i m3 146.35 #VALUE! #VALUE!
Balok lantai 1 & 2 40x60 (170 kg/ m3) G.sup.i m3 126.24 2,950,700.00 372,496,368.00
Balok lantai 1 & 2 25x40 (215 kg/ m3) G.sup.i m3 86.10 3,456,950.00 297,643,395.00
5 Ring balok 30x40, 20x30, balok givel 30x40, balok tangga 25x40 G.sup.i m3 99.58 3,175,700.00 316,236,206.00
(190 kg/ m3)
6 Plat lantai 1 & 2 tanpa balok (185 kg/ m3) G.sup.i m3 212.11 3,119,450.00 661,666,539.50
7 Plat daag, listplank daag, plat sunshiding jendela (100 kg/ m3) G.sup.i m3 162.26 2,163,200.00 351,000,832.00
8 Tangga beton :
- plat tangga + bordes t.15 cm (185 kg/ m3) G.sup.i m3 39.48 3,119,450.00 123,155,886.00
- anak tangga & bordes (100 kg/ m3) G.sup.i m3 25.19 2,163,200.00 54,491,008.00
9 Kolom 15/15, balok pengunci kusen aluminium 10/30 (170 kg/ m3) G.sup.i m3 34.09 2,950,700.00 100,589,363.00
10 Pondasi Lift (190 kg/ m3) G.sup.i m3 6.00 3,175,700.00 19,054,200.00
Jumlah #VALUE!
V PEKERJAAN KAP/ATAP, PLAFOND
1 - Kap baja L 70.70.7, L 60.60.6 (kap gording) 3/4.(I.1) kg 2,152.82 16,118.75 34,700,767.38
- Plat landas & perletakan t.10 mm, plat buhul 8 mm 3/4.(I.3) kg 920.85 16,118.75 14,842,950.94
- Bout angker dia.3/4" - 40 cm - buah 40.00 10,000.00 400,000.00
- Bout angker dia.1/2" - 30 cm - buah 750.00 8,500.00 6,375,000.00
Las-lasan - ls 1.00 - -
2 Penutup atap polycarbonat - m2 115.00 - -
3 Bubungan /pemuung setara atap - m' 35.00 - -
4 Listplank kap baja - m' 40.00 - -
5 Kuda-kuda / rangka atap baja ringan - m2 1,153.00 15,000.00 17,295,000.00
Satuan

Harga Satuan Jumlah


No. Uraian Pekerjaan Analisa Volume
1 2 3 4 5 6(Rp.) 7 (Rp.)

6 Atap setara atap metal multi colour 0,4 mm type prisma (metal + H.9 m2 1,153.00 12,420.00 14,320,260.00
zincalume coated)
7 Talang jurai baja ringan papan reuter 2/25 + papan tampuk 2x2/15 - m' 319.00 - -
8 Listplank papan ulin 2x2/20 + lanan 5/7 pengencang - m2 75.20 - -
9 Plafond transparan (fiber) + rangka stainless - m2 64.00 - -
10 Plafond gipsum 9 mm + rangka F.37 m2 2,828.08 52,880.00 149,548,870.40
11 List gipsum lebar 25 cm - m' 2,615.97 - -
12 Plafond kisi-kisi lanan + rangka + list (samping givel) F.37.a m2 46.50 83,030.00 3,860,895.00
13 Beugel + besi strip + mur-bout + angker tanam (perlengkapan kuda- - buah 3,899.00 - -
kuda)
Jumlah 241,343,743.71
VI PEK. KUSEN, PINTU, JENDELA/VENTILASI DAN
PERLENGKAPAN PINTU
1 Kusen kayu ulin 6/14 F.26 m3 13.56 3,867,500.00 52,443,300.00
Kusen aluminium warna + karet (terpasang) - m' 1,424.30 - -
2 Pintu panil ulin berukir ganda terpasang - pasang 3.00 - -
Pintu lipat/folding gate (ruang saji) - m2 25.00 - -
3 Pintu kaca 5 mm - m2 16.00 - -
4 Pintu panil lanan (pabrikasi) - m2 49.08 - -
5 Pintu panil ulin (pabrikasi) - m2 50.47 - -
6 Dinding partisi double kalsiboard t.6 mm rangka kayu 5/10 - m2 239.20 - -
7 Daun jendela kaca rayband 5 mm - m2 75.49 - -
8 Kaca mati rayband 5 mm - m2 187.17 50,000.00 9,358,500.00
9 Kaca stopsol (termasuk jendela) warna biru - m2 403.06 - -
10 Kunci tanam 2 slaag setara seis - buah 72.00 - -
11 Kunci Alpha KM/WC - buah 18.00 - -
12 Espagnolete tanam - pasang 15.00 - -
13 Engsel pintu kuningan 4" - buah 396.00 8,000.00 3,168,000.00
14 Grendel pintu toilet - buah 17.00 - -
15 Engsel pintu kuningan 3" - buah 216.00 7,500.00 1,620,000.00
16 Grendel jendela - buah 216.00 - -
17 Kait angin jendela kuningan - buah 216.00 - -
18 Pegangan jendela - buah 108.00 - -
19 Casment jendela kaca stopsol - buah 16.00 - -
Jumlah 66,589,800.00
VII PEK. INSTALASI AIR / SANITAIR
1 Kloset duduk - buah 18.00 - -
2 Urinoir - buah 12.00 - -
3 Bak air lapis keramik - buah 16.00 - -
4 Kran air sun ei - buah 16.00 - -
5 FD - buah 30.00 - -
6 Wastafel + kran + cermin & meja wastafel - unit 15.00 - -
7 Septic tank + bak peresapan - unit 5.00 - -
8 Instalasi air bersih dari menara - ls 1.00 - -
9 Instalasi air kotor/bekas - ls 1.00 - -
10 Bak air (fiber kap. 2 m3) - unit 2.00 - -
11 Pompa listrik + instalasi air dan penyambungan ke PDAM - unit 1.00 - -
12 Sal. Keliling pas bata diplester + gorong-gorong 1/2 dia. - m' 139.00 - -
13 Bak kontrol 40 x 40 cm - buah 12.00 - -
14 Grille penutup saluran teras - m' 55.50 - -
15 Ground Reservoir 2x5x2 m - buah 1.00 - -
16 Tempat wudhu lapis keramik + kran - buah 2.00 - -
Jumlah -
VIII PEK. CAT-CATAN, LAIN-LAIN
1 Cat tembok (plafond, dinding) setara Danacryl G.53.a m2 11,665.38 516,500.00 6,025,168,770.00
2 Cat kilap/ kayu setara Dulux (2K6+K.23) m2 499.30 74,175.00 37,035,577.50
3 Cat menie/ ter-teran - ls 1.00 - -
4 Reilling tangga steinlis/ void - m2 20.00 - -
Reilling tangga steinlis - m' 94.00 - -
Ukiran reilling tangga ulin - buah 12.00 - -
Plint karet injakan tangga - m' 133.20 - -
5 Pas. ubin keramik 40 x 40 (type rocktile) G.72 m2 2,744.62 68,546.00 188,132,722.52
Pas. ubin keramik (lantai/ dinding toilet) G.72.c m2 494.60 63,546.00 31,429,851.60
Pas. Dinding granit (luar depan, samping kanan kiri) - m2 197.50 - -
Logo dan tulisan DPRD kuningan/ stenlis - unit 1.00 - -
Dinding granit tempat logo - m2 9.00 - -
Ubin keramik 40 x 40 anti slip pada ram dan carport G.72/m2 m2 82.50 73,546.00 6,067,545.00
Satuan

Harga Satuan Jumlah


No. Uraian Pekerjaan Analisa Volume
1 2 3 4 5 6(Rp.) 7 (Rp.)

Pasangan batu alam kel. Bangunan dan bawah tangga - m2 67.82 - -


Plint keramik 10 x 40 - m' 1,271.65 - -
6 Ukiran ulin pada dinding luar depan dan dahi lawang terpasang - ls 1.00 - -
7 Expose kolom diameter 40 keliling bangunan - buah 33.00 - -
Expose kolom diameter 50 depan bangunan - buah 10.00 - -
Expose kolom 50 x 50 pada aula - buah 6.00 - -
Expose kolom diameter 50 pada bordes lantai I dan dicat dengan - buah 2.00 - -
airbrush
Expose kolom 40 x 40 pada ruang rapat/ sidang - buah 10.00 - -
Expose kolom diameter 40 pada void - buah 2.00 - -
Plesteran kolom - ls 1.00 - -
8 Bak bunga - buah 10.00 - -
9 Pentas lantai dasar dan lantai dua - unit 2.00 - -
10 Expose plesteran atap daag, listplank beton, geuvel G.50q+G.48 m2 2,073.26 22,316.10 46,267,077.49
11 List plesteran dinding luar - m' 303.00 - -
12 Lapisan waterprofing (talang daag) - m2 350.00 - -
13 Plang nama gedung pada halaman kantor 5 x 2 m lapis keramik, - unit 1.00 - -
tulisan dan logo stenlis + pot bunga
14 Sunshiding beton variasi dg kayu dan cat - m' 94.00 - -
15 Ukiran dan panil ulin untuk background panggung lantai dasar - unit 1.00 - -
16 Ukiran dan panil ulin untuk background panggung lantai ruang - unit 1.00 - -
sidang
17 Tangga darurat besi - unit 1.00 - -
Jumlah 6,334,101,544.11
B FASILITAS PENUNJANG
I PEK. INSTALASI LISTRIK
1 Penyambungan daya PLN - paket 1.00 - -
2 Ohm saklar/ time swit (terpasang) - unit 1.00 - -
3 Panel utama - unit 1.00 - -
4 Panel pembagi (PHB I, PHB II, PHB III) - unit 3.00 - -
5 Panel AC - unit 3.00 - -
6 Panel sound system - unit 3.00 - -
7 Panel telepon - unit 3.00 - -
8 Kabel NYFGBY 4 x 120 mm2 - m' 128.00 - -
9 Kabel NYY 4 x 50 mm2 - m' 20.00 - -
10 Kabel NYY 4 x 35 mm2 - m' 19.00 - -
11 Kabel NYY 4 x 25 mm2 - m' 24.00 - -
12 Kabel NYY 4 x 16 mm2 - m' 12.00 - -
13 Kabel NYM 3 x 4 mm2 - m' 114.00 - -
14 Lampu TL 3 x 18 w + Rmo - buah 18.00 - -
15 Lampu TL 2 x 18 w + Rmo - buah 61.00 - -
16 Lampu baret SL 40 w - buah 14.00 - -
17 Lampu pijar 40 w - buah 41.00 - -
18 Lampu tanam (DL) SL 75 w - buah 174.00 - -
19 Lampu tanam (DL) Hollogen 50 w - buah 28.00 - -
20 Lampu dinding/ spotlight 25 w - buah 2.00 - -
21 Saklar tunggal - buah 40.00 - -
22 Lampu hias 300 w - buah 1.00 - -
23 Lampu hias 200 w - buah 2.00 - -
24 Stop kontak 200 w setara bravo warna - buah 66.00 - -
25 Instalasi (titik lampu + stop kontak) - titik 409.00 - -
26 Saklar ganda - buah 65.00 - -
27 Instalasi AC ceiling - unit 44.00 - -
Jumlah -
II PEK. INSTALASI PENANGKAL PETIR
1 Air terminal (rod type), tembaga murni, tinggi 30 cm, dia. 3/4" ujung - buah 6.00 - -
runcing
2 Support gip. Med class dia. 1" tinggi 50 cm - buah 6.00 - -
3 BC 50 mm2 - m 200.00 - -
4 Pentanahan lengkap dengan bak kontrol - titik 2.00 - -
5 Material bantu (klem, fisher, sekrup, dll) - ls 1.00 - -
Jumlah -
DAFTAR ANALISA HARGA SATUAN

Unit Kerja : Dinas Kimpraswil Kota Banjarbaru


Kegiatan : Pembangunan Gedung/ Kantor Kota Banjarbaru
Pekerjaan : Pembangunan Gedung DPRD Kota Banjarbaru
No. Paket : 01 (satu)
Lokasi : Banjarbaru

Upah Bahan Jumlah


No. Uraian Pekerjaan Analisa/ Satuan
Rp. Rp. Rp.

1 Galian Tanah Keras A.2/ m3


hari Pekerja 27,500.00 #VALUE! #VALUE!
0.0330 hari Mandor 45,000.00 1,485.00 1,485.00
#VALUE! - #VALUE!

2 Urugan Pasir di Bawah Lantai A.18/ m3


1.2000 m3 Pasir urug 35,000.00 42,000.00 42,000.00
0.3000 hari Pekerja 27,500.00 8,250.00 8,250.00
0.0100 hari Mandor 45,000.00 450.00 450.00
8,700.00 42,000.00 50,700.00

3 Urugan Tanah di Bawah Lantai A.16/ m3


1.2500 m3 Tanah urug 25,000.00 31,250.00 31,250.00
0.2500 hari Pekerja 27,500.00 6,875.00 6,875.00
0.0100 hari Mandor 45,000.00 450.00 450.00
7,325.00 31,250.00 38,575.00

4 Pasangan Batu Bata campuran 1 G.33h+G.27/ m3


:4 700.0000 bh Batu bata 350.00 245,000.00 245,000.00
2.5330 zak Semen (50 kg) 44,000.00 111,452.00 111,452.00
0.4060 m3 Pasir pasang 55,000.00 22,330.00 22,330.00
0.1500 hari Kepala tukang 40,000.00 6,000.00 6,000.00
1.5000 hari Tukang batu 35,000.00 52,500.00 52,500.00
4.5000 hari Pekerja 27,500.00 123,750.00 123,750.00
0.2250 hari Mandor 45,000.00 10,125.00 10,125.00
192,375.00 378,782.00 571,157.00

5 Pasangan Batu Bata campuran 1 G.33m+G.27/ m 3

:2 700.0000 bh Batu bata 350.00 245,000.00 245,000.00


4.1170 zak Semen (50 kg) 44,000.00 181,148.00 181,148.00
0.3330 m3 Pasir pasang 55,000.00 18,315.00 18,315.00
0.1500 hari Kepala tukang 40,000.00 6,000.00 6,000.00
1.5000 hari Tukang batu 35,000.00 52,500.00 52,500.00
4.5000 hari Pekerja 27,500.00 123,750.00 123,750.00
0.2250 hari Mandor 45,000.00 10,125.00 10,125.00
192,375.00 444,463.00 636,838.00

6 Plesteran Batu Bata campuran 1 G.50q+G.48/ m2


:4 0.0864 zak Semen (50 kg) 44,000.00 3,801.60 3,801.60
0.0139 m3 Pasir pasang 55,000.00 764.50 764.50
0.0150 hari Kepala tukang 40,000.00 600.00 600.00
0.1500 hari Tukang batu 35,000.00 5,250.00 5,250.00
0.4000 hari Pekerja 27,500.00 11,000.00 11,000.00
0.0200 hari Mandor 45,000.00 900.00 900.00
17,750.00 4,566.10 22,316.10

7 Pasangan Batu Gunung/Kali G.32h+G.26/ m3


Campuran 1 : 4 1.2000 m3 Batu kali 65,000.00 78,000.00 78,000.00
3.2568 zak Semen (50 kg) 44,000.00 143,299.20 143,299.20
0.5220 m3 Pasir pasang 55,000.00 28,710.00 28,710.00
0.1200 hari Kepala tukang 40,000.00 4,800.00 4,800.00
1.2000 hari Tukang batu 35,000.00 42,000.00 42,000.00
3.6000 hari Pekerja 27,500.00 99,000.00 99,000.00
0.1800 hari Mandor 45,000.00 8,100.00 8,100.00
153,900.00 250,009.20 403,909.20

8 Pekerjaan Beton Campuran G.67/ m 2

1:3:6 0.0700 m3 Kerikil 65,000.00 4,550.00 4,550.00


0.0450 m3 Pasir pasang 55,000.00 2,475.00 2,475.00
0.0350 zak Semen (50 kg) 44,000.00 1,540.00 1,540.00
0.0135 hari Kepala tukang 40,000.00 540.00 540.00
0.1350 hari Tukang batu 35,000.00 4,725.00 4,725.00
0.0720 hari Pekerja 27,500.00 1,980.00 1,980.00
0.0360 hari Mandor 45,000.00 1,620.00 1,620.00
8,865.00 8,565.00 17,430.00
Tebal 7 cm = 126,642.86 122,357.14 249,000.00
Tebal 5 cm = 177,300.00 171,300.00 348,600.00

9 Pekerjaan Beton Campuran 1 : G.41/ m3


2:3 0.8200 m3 Kerikil 65,000.00 53,300.00 53,300.00
0.5400 m3 Pasir pasang 55,000.00 29,700.00 29,700.00
6.8000 zak Semen (50 kg) 44,000.00 299,200.00 299,200.00
0.1000 hari Kepala tukang 40,000.00 4,000.00 4,000.00
1.0000 hari Tukang batu 35,000.00 35,000.00 35,000.00
6.0000 hari Pekerja 27,500.00 165,000.00 165,000.00
0.3000 hari Mandor 45,000.00 13,500.00 13,500.00
217,500.00 382,200.00 599,700.00
Upah Bahan Jumlah
No. Uraian Pekerjaan Analisa/ Satuan
Rp. Rp. Rp.
10 Pekerjaan Beton Campuran 1 : G.43.a/ m3
3:5 0.9100 m3 Kerikil 65,000.00 59,150.00 59,150.00
0.5400 m3 Pasir pasang 55,000.00 29,700.00 29,700.00
4.5400 zak Semen (50 kg) 44,000.00 199,760.00 199,760.00
0.0500 hari Kepala tukang 40,000.00 2,000.00 2,000.00
0.5000 hari Tukang batu 35,000.00 17,500.00 17,500.00
6.0000 hari Pekerja 27,500.00 165,000.00 165,000.00
0.3000 hari Mandor 45,000.00 13,500.00 13,500.00
198,000.00 288,610.00 486,610.00

11 Pekerjaan Tulangan Besi G.3/4-12/ 100 kg


3.0000 hari Kepala tukang 40,000.00 120,000.00 120,000.00
9.0000 hari Tukang besi 35,000.00 315,000.00 315,000.00
6.0000 hari Pekerja 27,500.00 165,000.00 165,000.00
110.0000 kg Besi beton 6,000.00 660,000.00 660,000.00
2.0000 kg Kawat beton 7,500.00 15,000.00 15,000.00
600,000.00 675,000.00 1,275,000.00
3/4 x Upah 450,000.00 675,000.00 1,125,000.00
untuk Tulangan 1 kg 4,500.00 6,750.00 11,250.00

12 Pekerjaan Cetakan F.8/ 10 m2


0.5000 hari Kepala tukang 40,000.00 20,000.00 20,000.00
5.0000 hari Tukang kayu 35,000.00 175,000.00 175,000.00
6.0000 hari Pekerja 27,500.00 165,000.00 165,000.00
0.1000 hari Mandor 45,000.00 4,500.00 4,500.00
4.0000 kg Paku 9,000.00 36,000.00 36,000.00
0.0400 m3 Kayu bekisting (kelas 3) 950,000.00 38,000.00 38,000.00
364,500.00 74,000.00 438,500.00

13 Pekerjaan Kusen Pintu/ Jendela F.26/ m3


dari Ulin 3.0000 hari Kepala tukang 40,000.00 120,000.00 120,000.00
30.0000 hari Tukang kayu 35,000.00 1,050,000.00 1,050,000.00
10.0000 hari Pekerja 27,500.00 275,000.00 275,000.00
0.5000 hari Mandor 45,000.00 22,500.00 22,500.00
1.2000 m3 Kayu ulin 2,000,000.00 2,400,000.00 2,400,000.00
1,467,500.00 2,400,000.00 3,867,500.00

14 Rangka Kap Kuda-kuda Bentang 3/4 F.23/ m3


>7m 3.6000 hari Kepala tukang 40,000.00 144,000.00 144,000.00
36.0000 hari Tukang kayu 35,000.00 1,260,000.00 1,260,000.00
12.0000 hari Pekerja 27,500.00 330,000.00 330,000.00
0.6000 hari Mandor 45,000.00 27,000.00 27,000.00
1.2000 m3 Kayu lanan 1,200,000.00 1,440,000.00 1,440,000.00
8.0000 kg Paku/ beugel/ angker 9,000.00 72,000.00 72,000.00
1,761,000.00 1,512,000.00 3,273,000.00

15 Pekerjaan Plafond Gifsum 9 mm F.37/ m2

+ Rangka 0.0800 hari Kepala tukang 40,000.00 3,200.00 3,200.00


0.8000 hari Tukang kayu 35,000.00 28,000.00 28,000.00
0.2800 hari Pekerja 27,500.00 7,700.00 7,700.00
0.0140 hari Mandor 45,000.00 630.00 630.00
0.0100 m3 Kayu lanan 1,200,000.00 12,000.00 12,000.00
0.3360 lbr Gifsum - - -
0.1500 kg Paku 9,000.00 1,350.00 1,350.00
39,530.00 13,350.00 52,880.00

16 Pekerjaan Plafond Kisi-kisi Lanan F.37.a/ m2


+ Rangka Upah sama dengan F.37 39,530.00 39,530.00
0.0240 m3 Papan lanan 1,200,000.00 28,800.00 28,800.00
0.0100 m3 Kayu lanan 1,200,000.00 12,000.00 12,000.00
0.3000 kg Paku 9,000.00 2,700.00 2,700.00
39,530.00 43,500.00 83,030.00

17 Pekerjaan Listplank/ Tumbukan F.21/ m2


Kasau dari Ulin 0.0800 hari Kepala tukang 40,000.00 3,200.00 3,200.00
0.8000 hari Tukang kayu 35,000.00 28,000.00 28,000.00
0.2800 hari Pekerja 27,500.00 7,700.00 7,700.00
0.0140 hari Mandor 45,000.00 630.00 630.00
0.0240 m3 Papan ulin 2,000,000.00 48,000.00 48,000.00
0.2500 kg Paku 9,000.00 2,250.00 2,250.00
39,530.00 50,250.00 89,780.00

18 Pekerjaan Kasau/ Reng F.16/ m2

0.0100 hari Kepala tukang 40,000.00 400.00 400.00


0.1000 hari Tukang kayu 35,000.00 3,500.00 3,500.00
0.1000 hari Pekerja 27,500.00 2,750.00 2,750.00
0.0025 hari Mandor 45,000.00 112.50 112.50
0.0160 m3 Kayu lanan 1,200,000.00 19,200.00 19,200.00
0.2500 kg Paku 9,000.00 2,250.00 2,250.00
6,762.50 21,450.00 28,212.50

19 Pekerjaan Besi Siku, Besi C + 3/4 (I.1)/ 100 kg


termasuk Las-lasan 9.0000 hari Tukang besi 35,000.00 315,000.00 315,000.00
3.0000 hari Kepala tukang 40,000.00 120,000.00 120,000.00
9.0000 hari Pekerja 27,500.00 247,500.00 247,500.00
110.0000 kg Besi siku 10,000.00 1,100,000.00 1,100,000.00
682,500.00 1,100,000.00 1,782,500.00
Upah 3/4 511,875.00 1,100,000.00 1,611,875.00
per kg 5,118.75 11,000.00 16,118.75
Upah Bahan Jumlah
No. Uraian Pekerjaan Analisa/ Satuan
Rp. Rp. Rp.
20 Pekerjaan Besi Plat + termasuk 3/4 (I.3)/ 100 kg
Las-lasan 9.0000 hari Tukang besi 35,000.00 315,000.00 315,000.00
3.0000 hari Kepala tukang 40,000.00 120,000.00 120,000.00
9.0000 hari Pekerja 27,500.00 247,500.00 247,500.00
110.0000 kg Besi plat 9,000.00 990,000.00 990,000.00
682,500.00 990,000.00 1,672,500.00
Upah 3/4 511,875.00 990,000.00 1,501,875.00
per kg 5,118.75 9,900.00 15,018.75

21 Pekerjaan Atap Genteng Metal H.9/ m2


Multi Colour type Prima tebal 0,4 0.0200 hari Kepala tukang 40,000.00 800.00 800.00
mm 0.2000 hari Tukang kayu 35,000.00 7,000.00 7,000.00
0.1500 hari Pekerja 27,500.00 4,125.00 4,125.00
0.0050 hari Mandor 45,000.00 225.00 225.00
1.0000 m2 Genteng metal - - -
0.0300 kg Paku genteng metal 9,000.00 270.00 270.00
12,150.00 270.00 12,420.00

22 100 m2 Cat Dinding/ Plafond G.53.a


(minimal 2 x atau rata) 1.0000 hari Tukang cat 35,000.00 35,000.00 35,000.00
6.0000 hari Pekerja 27,500.00 165,000.00 165,000.00
0.1000 hari Kepala tukang 40,000.00 4,000.00 4,000.00
6.2500 galon Cat tembok 50,000.00 312,500.00 312,500.00
204,000.00 312,500.00 516,500.00

23 10 m2 Pekerjaan Cat Kilap (2K.6+K.23)


0.7000 hari Tukang cat 35,000.00 24,500.00 24,500.00
0.0700 hari Kepala tukang 40,000.00 2,800.00 2,800.00
0.5000 hari Pekerja 27,500.00 13,750.00 13,750.00
0.0250 hari Mandor 45,000.00 1,125.00 1,125.00
2.6000 kg Cat kilap 10,000.00 26,000.00 26,000.00
0.5000 ltr Minyak cat (tener b) 5,000.00 2,500.00 2,500.00
1.0000 lbr Amplas 3,500.00 3,500.00 3,500.00
42,175.00 32,000.00 74,175.00

24 100 m2 Cat Tembok Luar Dalam G.53.b


Beton setara Danacryl (minimal 2 1.0000 hari Tukang cat 35,000.00 35,000.00 35,000.00
x atau rata) 6.0000 hari Pekerja 27,500.00 165,000.00 165,000.00
0.1000 hari Kepala tukang 40,000.00 4,000.00 4,000.00
6.2500 galon Cat tembok 50,000.00 312,500.00 312,500.00
204,000.00 312,500.00 516,500.00

25 Pasangan Ubin Keramik 40 x 40 G.72/ m2


Anti Slip 1.0000 m2 Keramik 40,000.00 40,000.00 40,000.00
0.1740 zak Semen (50 kg) 44,000.00 7,656.00 7,656.00
0.0230 m3 Pasir pasang 55,000.00 1,265.00 1,265.00
0.0250 hari Kepala tukang 40,000.00 1,000.00 1,000.00
0.2500 hari Tukang batu 35,000.00 8,750.00 8,750.00
0.5000 hari Pekerja 27,500.00 13,750.00 13,750.00
0.0250 hari Mandor 45,000.00 1,125.00 1,125.00
24,625.00 48,921.00 73,546.00

26 Pasangan Ubin Keramik 40 x 40 G.72.a/ m 2

type Rocktile 1.0000 m2 Keramik 35,000.00 35,000.00 35,000.00


0.1740 zak Semen (50 kg) 44,000.00 7,656.00 7,656.00
0.0230 m3 Pasir pasang 55,000.00 1,265.00 1,265.00
0.0250 hari Kepala tukang 40,000.00 1,000.00 1,000.00
0.2500 hari Tukang batu 35,000.00 8,750.00 8,750.00
0.5000 hari Pekerja 27,500.00 13,750.00 13,750.00
0.0250 hari Mandor 45,000.00 1,125.00 1,125.00
24,625.00 43,921.00 68,546.00

27 Pasangan Ubin Keramik 20 x 25 G.72.b/ m2


dan Dinding Keramik 20 x 25 1.0000 m2 Keramik 30,000.00 30,000.00 30,000.00
0.1740 zak Semen (50 kg) 44,000.00 7,656.00 7,656.00
0.0230 m3 Pasir pasang 55,000.00 1,265.00 1,265.00
0.0250 hari Kepala tukang 40,000.00 1,000.00 1,000.00
0.2500 hari Tukang batu 35,000.00 8,750.00 8,750.00
0.5000 hari Pekerja 27,500.00 13,750.00 13,750.00
0.0250 hari Mandor 45,000.00 1,125.00 1,125.00
24,625.00 38,921.00 63,546.00

Pekerjaan Beton
28 Beton Bertulang Poer, camp. 1 : G.sup I./ m3
2 : 3 untuk 200 kg G.41/ m3 217,500.00 382,200.00 599,700.00
G.3/4-12 tulangan 200 kg 900,000.00 1,350,000.00 2,250,000.00
F.8/10 m2 Cetakan/ Bongkaran 364,500.00 74,000.00 438,500.00
1,482,000.00 1,806,200.00 3,288,200.00

29 Beton Bertulang Sloof 25/40, G.sup I./ m3


camp. 1 : 2 : 3 untuk 290 kg G.41/ m3 217,500.00 382,200.00 599,700.00
G.3/4-12 tulangan 290 kg 1,305,000.00 1,957,500.00 3,262,500.00
F.8/10 m2 Cetakan/ Bongkaran 364,500.00 74,000.00 438,500.00
1,887,000.00 2,413,700.00 4,300,700.00

30 Beton Bertulang Sloof 40/60 di G.sup I./ m3


Atas Lantai Dasar, camp. 1 : 2 : 3 G.41/ m3 217,500.00 382,200.00 599,700.00
untuk 160 kg
Beton Bertulang Sloof 40/60 di Upah Bahan Jumlah
No. Atas Lantai
Uraian Pekerjaan
Dasar, camp. 1 : 2 : 3 Analisa/ Satuan
untuk 160 kg Rp. Rp. Rp.
G.3/4-12 tulangan 160 kg 720,000.00 1,080,000.00 1,800,000.00
F.8/10 m2 Cetakan/ Bongkaran 364,500.00 74,000.00 438,500.00
1,302,000.00 1,536,200.00 2,838,200.00

31 Beton Bertulang Kolom, camp. 1 : G.sup I./ m3


2 : 3 untuk 210 kg G.41/ m3 217,500.00 382,200.00 599,700.00
G.3/4-12 tulangan 210 kg 945,000.00 1,417,500.00 2,362,500.00
F.8/10 m2 Cetakan/ Bongkaran langan 74,000.00 #VALUE!
1,162,500.00 1,873,700.00 #VALUE!

32 Beton Bertulang Balok/ Ring G.sup I./ m3


Balok, camp. 1 : 2 : 3 untuk 170 G.41/ m3 217,500.00 382,200.00 599,700.00
kg G.3/4-12 tulangan 190 kg 855,000.00 1,282,500.00 2,137,500.00
F.8/10 m2 Cetakan/ Bongkaran 364,500.00 74,000.00 438,500.00
1,437,000.00 1,738,700.00 3,175,700.00

33 Beton Bertulang Balok Lantai G.sup I./ m3


40/60, camp. 1 : 2 : 3 untuk 170 G.41/ m3 217,500.00 382,200.00 599,700.00
kg G.3/4-12 tulangan 170 kg 765,000.00 1,147,500.00 1,912,500.00
F.8/10 m2 Cetakan/ Bongkaran 364,500.00 74,000.00 438,500.00
1,347,000.00 1,603,700.00 2,950,700.00

34 Beton Bertulang Balok Lantai G.sup I./ m3


25/40, camp. 1 : 2 : 3 untuk 215 G.41/ m3 217,500.00 382,200.00 599,700.00
kg G.3/4-12 tulangan 215 kg 967,500.00 1,451,250.00 2,418,750.00
F.8/10 m2 Cetakan/ Bongkaran 364,500.00 74,000.00 438,500.00
1,549,500.00 1,907,450.00 3,456,950.00

35 Beton Bertulang Plat Lantai 1 & G.sup I./ m3


2, Plat Tangga, bordes, camp. 1 : G.41/ m3 217,500.00 382,200.00 599,700.00
2 : 3 untuk 185 kg G.3/4-12 tulangan 185 kg 832,500.00 1,248,750.00 2,081,250.00
F.8/10 m2 Cetakan/ Bongkaran 364,500.00 74,000.00 438,500.00
1,414,500.00 1,704,950.00 3,119,450.00

36 Beton Bertulang Plat Daag, G.sup I./ m3


Listplank Sunshiding, Anak G.41/ m3 217,500.00 382,200.00 599,700.00
Tangga, camp. 1 : 2 : 3 untuk 100 G.3/4-12 tulangan 100 kg 450,000.00 675,000.00 1,125,000.00
kg F.8/10 m2 Cetakan/ Bongkaran 364,500.00 74,000.00 438,500.00
1,032,000.00 1,131,200.00 2,163,200.00

37 Beton Bertulang Kolom 15/15, G.sup I./ m3


Balok 10/13, camp. 1 : 2 : 3 untuk G.41/ m3 217,500.00 382,200.00 599,700.00
170 kg G.3/4-12 tulangan 170 kg 765,000.00 1,147,500.00 1,912,500.00
F.8/10 m2 Cetakan/ Bongkaran 364,500.00 74,000.00 438,500.00
1,347,000.00 1,603,700.00 2,950,700.00

38 Beton Bertulang Shaft Talang, G.sup I./ m3


camp. 1 : 2 : 3 untuk 75 kg G.41/ m3 217,500.00 382,200.00 599,700.00
G.3/4-12 tulangan 75 kg 337,500.00 506,250.00 843,750.00
F.8/10 m2 Cetakan/ Bongkaran 364,500.00 74,000.00 438,500.00
919,500.00 962,450.00 1,881,950.00

39 Beton Bertulang Plat Tangga, G.sup I./ m3


camp. 1 : 2 : 3 untuk 185 kg G.41/ m3 217,500.00 382,200.00 599,700.00
G.3/4-12 tulangan 185 kg 832,500.00 1,248,750.00 2,081,250.00
F.8/10 m2 Cetakan/ Bongkaran 364,500.00 74,000.00 438,500.00
1,414,500.00 1,704,950.00 3,119,450.00

40 Beton Bertulang Anak Tangga, G.sup I./ m3


camp. 1 : 2 : 3 untuk 40 kg G.41/ m3 217,500.00 382,200.00 599,700.00
G.3/4-12 tulangan 40 kg 180,000.00 270,000.00 450,000.00
F.8/10 m2 Cetakan/ Bongkaran 364,500.00 74,000.00 438,500.00
762,000.00 726,200.00 1,488,200.00
DAFTAR HARGA UPAH & BAHAN

Unit Kerja : Dinas Kimpraswil Kota Banjarbaru


Kegiatan : Pembangunan Gedung/ Kantor Kota Banjarbaru
Pekerjaan : Pembangunan Gedung DPRD Kota Banjarbaru
No. Paket : 01 (satu)
Lokasi : Banjarbaru

No. Uraian Satuan Harga Satuan

I Upah
1 Pekerja hari 27,500.00
2 Mandor hari 45,000.00
3 Tukang kayu hari 35,000.00
4 Tukang batu hari 35,000.00
5 Tukang cat hari 35,000.00
6 Tukang besi hari 35,000.00
7 Tukang dempul hari 35,000.00
8 Tukang plitur hari 35,000.00
9 Kepala tukang hari 40,000.00

II Bahan
1 Tanah urug m3 25,000.00
2 Pasir urug m3 35,000.00
3 Pasir pasang m3 55,000.00
4 Semen (50 kg) zak 44,000.00
5 Kerikil m3 65,000.00
6 Batu bata bh 350.00
7 Batu kali m3 65,000.00
8 Keramik 20x25 m2 30,000.00
9 Keramik 20x20 (permukaan kasar) m2 30,000.00
10 Keramik 45x45 m2 40,000.00
11 Keramik 40x40 type Rocktile warna m2 35,000.00
12 Besi beton kg 6,000.00
13 Kawat beton kg 7,500.00
14 Kayu bekisting (kelas 3) m3 950,000.00
15 Paku kg 9,000.00
16 Kayu ulin m3 2,000,000.00
17 Papan ulin m3 2,000,000.00
18 Kayu lanan m3 1,200,000.00
19 Papan lanan m3 1,200,000.00
20 Gifsum 9 mm lbr 45,000.00
21 Paku sirap kg 9,000.00
22 Besi profil kg 10,000.00
23 Besi plat kg 9,000.00
24 Cat tembok setara danacryl 5 kg 50,000.00
25 Cat tembok setara danabrite 5 kg 50,000.00
26 Cat kilap setara dulux kg 10,000.00
27 Minyak cat (tener b) ltr 5,000.00
28 Amplas lbr 3,500.00
29 Atap metal multi colour type prima 0,40 mm m2 -
30 Nok setara metal warna m' -
31 Kayu galam diameter 8-10 pj 5 m bj 5,000.00
32 Galam perancah pj 2 m bj 1,500.00
33 Atap polycarbonet m2 -
No. Uraian Satuan Harga Satuan

34 Kuda-kuda/ rangka atap baja ringan m2 15,000.00


35 Kaca ryben 5 mm m2 50,000.00
36 Kaca stopsol m2 -
37 Kusen alluminium m' -
38 Kunci tanam 2 slag setara seis buah -
39 Espagnolite tanam terpasang buah -
40 Engsel pintu kuningan 4" set 8,000.00
41 Engsel jendela kuningan 3" set 7,500.00
42 Papan gifsum tebal 9 mm lbr 45,000.00
43 Gerendel jendela buah 5,000.00
44 Kaitan angin kuningan buah 4,500.00
45 Kunci tanam + pegangan set -
46 Pegangan jendela buah 4,000.00
47 Closet duduk keramik buah -
48 Urinoir keramik buah -
49 Kran air setara sun ei buah -
50 FD buah -
51 Wastafel lengkap buah -

Banjarmasin, 05 Juni 2006


PT. Adiquatro Elektrikindo Perkasa

Djunaidi Limbong
Direktur
T i m e S c h e d u l e

Unit Kerja : Dinas Kimpraswil Kota Banjarbaru


Kegiatan : Pembangunan Gedung/ Kantor Kota Banjarbaru
Pekerjaan : Pembangunan Gedung DPRD Kota Banjarbaru
No. Paket : 01 (satu)
Lokasi : Banjarbaru
Satuan
Bobot
Harga Satuan Jumlah
No. Uraian Pekerjaan Analisa Volume
(Rp.) (Rp.)
A BANGUNAN UTAMA (%)
I PEKERJAAN PERSIAPAN
1 Direksi Keet - m2 64.00 100,000.00 6,400,000.00 #VALUE!
2 Izin Mendirikan Bangunan (IMB) - ls 1.00 50,000,000.00 50,000,000.00 #VALUE!
3 Pembersihan lahan / lokasi bangunan - m2 2,304.00 6,510.42 15,000,000.00 #VALUE!
4 Pengukuran / pasang bouwplank - m' 172.00 14,534.88 2,500,000.00 #VALUE!
5 Pembuatan pagar pengaman proyek + papan nama proyek - ls 1.00 5,160,000.00 5,160,000.00 #VALUE!
6 Mobilisasi dan Demobilisasi - ls 1.00 5,000,000.00 5,000,000.00 #VALUE!
Jumlah 84,060,000.00
II PEKERJAAN TANAH, PASIR, GALAM
1 Galian tanah pondasi batu kali & poer A.1 m3 976.72 #VALUE! #VALUE! #VALUE!
2 Urugan tanah kembali 1/3.A.1 m3 245.27 #VALUE! #VALUE! #VALUE!
3 Pasir urug bawah pondasi, lantai, rabat A.18 m3 458.04 50,700.00 23,222,628.00 #VALUE!
4 Tanah urug bawah lantai A.16 m3 728.70 38,575.00 28,109,602.50 #VALUE!
5 Tongkat kayu galam diameter 8-10 pj 5 m - bj 11,558.00 5,000.00 57,790,000.00 #VALUE!
6 Galam perancah pj 2 m - bj 18,904.00 1,500.00 28,356,000.00 #VALUE!
Jumlah #VALUE!
III PEK. PAS.BATU, BATA
1 Pasangan batu kosong - m3 84.37 135,000.00 11,389,950.00 #VALUE!
2 Pasangan batu kali camp. 1:4 G.32h+G.26 m3 205.28 403,909.20 82,914,480.58 #VALUE!
3 Lantai kerja camp. 1:3:5 (dibawah poer) G.43.a m3 6.51 486,610.00 3,167,831.10 #VALUE!
4 Lantai / raam kend.beton tumbuk tebal 7 cm camp. 1:3:6 G.67 m2 1,139.75 249,000.00 283,797,750.00 #VALUE!
Rabat beton cor tebal 5 cm camp. 1:3:6 G.67 m2 269.20 348,600.00 93,843,120.00 #VALUE!
5 Rollag/Trasraam/Pasangan dinding batu bata 1:2 G.33m+G.27 m3 63.86 636,838.00 40,668,474.68 #VALUE!
6 Plesteran Camp. 1:2 tebal 15 mm - m2 502.53 20,000.00 10,050,600.00 #VALUE!
7 Pasangan dinding batu bata camp. 1:4 G.33+G.27/m3 m3 426.79 571,157.00 243,764,096.03 #VALUE!
8 Plesteran dinding bata tebal 15 mm camp. 1:4 G.50q+G.48/m2 m2 6,952.13 22,316.10 155,144,428.29 #VALUE!
Jumlah 924,740,730.68
IV PEK. BETON BERTULANG
1 Plat poer (190 kg/ m3) G.sup.i m3 60.75 3,175,700.00 192,923,775.00 #VALUE!
2 Sloof 25/30 (290 kg/ m3) G.sup.i m3 30.00 4,300,700.00 129,021,000.00 #VALUE!
3 Sloof 40/50 (160 kg/ m3) G.sup.i m3 62.30 2,838,200.00 176,819,860.00 #VALUE!
4 Kolom 50x50, 40x40, dia.40, dia.30 (210 kg/ m 3) G.sup.i m3 146.35 #VALUE! #VALUE! #VALUE!
Balok lantai 1 & 2 40x60 (170 kg/ m3) G.sup.i m3 126.24 2,950,700.00 372,496,368.00 #VALUE!
Balok lantai 1 & 2 25x40 (215 kg/ m3) G.sup.i m3 86.10 3,456,950.00 297,643,395.00 #VALUE!
5 Ring balok 30x40, 20x30, balok givel 30x40, balok tangga 25x40 G.sup.i m3 99.58 3,175,700.00 316,236,206.00 #VALUE!
(190 kg/ m3)
6 Plat lantai 1 & 2 tanpa balok (185 kg/ m3) G.sup.i m3 212.11 3,119,450.00 661,666,539.50 #VALUE!
7 Plat daag, listplank daag, plat sunshiding jendela (100 kg/ m 3) G.sup.i m3 162.26 2,163,200.00 351,000,832.00 #VALUE!
8 Tangga beton :
- plat tangga + bordes t.15 cm (185 kg/ m3) G.sup.i m3 39.48 3,119,450.00 123,155,886.00 #VALUE!
Satuan
Bobot
Harga Satuan Jumlah
No. Uraian Pekerjaan Analisa Volume
(Rp.) (Rp.)
- anak tangga & bordes (100 kg/ m ) 3
G.sup.i m3
25.19 2,163,200.00 54,491,008.00 #VALUE!
(%)
9 Kolom 15/15, balok pengunci kusen aluminium 10/30 (170 kg/ m 3) G.sup.i m3 34.09 2,950,700.00 100,589,363.00 #VALUE!
10 Pondasi Lift (190 kg/ m3) G.sup.i m3 6.00 3,175,700.00 19,054,200.00 #VALUE!
Jumlah #VALUE!
V PEKERJAAN KAP/ATAP, PLAFOND
1 - Kap baja L 70.70.7, L 60.60.6 (kap gording) 3/4.(I.1) kg 2,152.82 16,118.75 34,700,767.38 #VALUE!
- Plat landas & perletakan t.10 mm, plat buhul 8 mm 3/4.(I.3) kg 920.85 16,118.75 14,842,950.94 #VALUE!
- Bout angker dia.3/4" - 40 cm - buah 40.00 10,000.00 400,000.00 #VALUE!
- Bout angker dia.1/2" - 30 cm - buah 750.00 8,500.00 6,375,000.00 #VALUE!
Las-lasan - ls 1.00 - - #VALUE!
2 Penutup atap polycarbonat - m2 115.00 - - #VALUE!
3 Bubungan /pemuung setara atap - m' 35.00 - - #VALUE!
4 Listplank kap baja - m' 40.00 - - #VALUE!
5 Kuda-kuda / rangka atap baja ringan - m2 1,153.00 15,000.00 17,295,000.00 #VALUE!
6 Atap setara atap metal multi colour 0,4 mm type prisma (metal + H.9 m2 1,153.00 12,420.00 14,320,260.00 #VALUE!
zincalume coated)
7 Talang jurai baja ringan papan reuter 2/25 + papan tampuk 2x2/15 - m' 319.00 - - #VALUE!
8 Listplank papan ulin 2x2/20 + lanan 5/7 pengencang - m2 75.20 - - #VALUE!
9 Plafond transparan (fiber) + rangka stainless - m2 64.00 - - #VALUE!
10 Plafond gipsum 9 mm + rangka F.37 m2 2,828.08 52,880.00 149,548,870.40 #VALUE!
11 List gipsum lebar 25 cm - m' 2,615.97 - - #VALUE!
12 Plafond kisi-kisi lanan + rangka + list (samping givel) F.37.a m2 46.50 83,030.00 3,860,895.00 #VALUE!
13 Beugel + besi strip + mur-bout + angker tanam (perlengkapan kuda- - buah 3,899.00 - - #VALUE!
kuda)
Jumlah 241,343,743.71
VI PEK. KUSEN, PINTU, JENDELA/VENTILASI DAN
PERLENGKAPAN PINTU
1 Kusen kayu ulin 6/14 F.26 m3 13.56 3,867,500.00 52,443,300.00 #VALUE!
Kusen aluminium warna + karet (terpasang) - m' 1,424.30 - - #VALUE!
2 Pintu panil ulin berukir ganda terpasang - pasang 3.00 - - #VALUE!
Pintu lipat/folding gate (ruang saji) - m2 25.00 - - #VALUE!
3 Pintu kaca 5 mm - m2 16.00 - - #VALUE!
4 Pintu panil lanan (pabrikasi) - m2 49.08 - - #VALUE!
5 Pintu panil ulin (pabrikasi) - m2 50.47 - - #VALUE!
6 Dinding partisi double kalsiboard t.6 mm rangka kayu 5/10 - m2 239.20 - - #VALUE!
7 Daun jendela kaca rayband 5 mm - m2 75.49 - - #VALUE!
8 Kaca mati rayband 5 mm - m2 187.17 50,000.00 9,358,500.00 #VALUE!
9 Kaca stopsol (termasuk jendela) warna biru - m2 403.06 - - #VALUE!
10 Kunci tanam 2 slaag setara seis - buah 72.00 - - #VALUE!
11 Kunci Alpha KM/WC - buah 18.00 - - #VALUE!
12 Espagnolete tanam - pasang 15.00 - - #VALUE!
13 Engsel pintu kuningan 4" - buah 396.00 8,000.00 3,168,000.00 #VALUE!
14 Grendel pintu toilet - buah 17.00 - - #VALUE!
15 Engsel pintu kuningan 3" - buah 216.00 7,500.00 1,620,000.00 #VALUE!
16 Grendel jendela - buah 216.00 - - #VALUE!
17 Kait angin jendela kuningan - buah 216.00 - - #VALUE!
18 Pegangan jendela - buah 108.00 - - #VALUE!
19 Casment jendela kaca stopsol - buah 16.00 - - #VALUE!
Jumlah 66,589,800.00
VII PEK. INSTALASI AIR / SANITAIR
1 Kloset duduk - buah 18.00 - - #VALUE!
2 Urinoir - buah 12.00 - - #VALUE!
Satuan
Bobot
Harga Satuan Jumlah
No. Uraian Pekerjaan Analisa Volume
(Rp.) (Rp.)
3 Bak air lapis keramik - buah 16.00 - - #VALUE!
(%)
4 Kran air sun ei - buah 16.00 - - #VALUE!
5 FD - buah 30.00 - - #VALUE!
6 Wastafel + kran + cermin & meja wastafel - unit 15.00 - - #VALUE!
7 Septic tank + bak peresapan - unit 5.00 - - #VALUE!
8 Instalasi air bersih dari menara - ls 1.00 - - #VALUE!
9 Instalasi air kotor/bekas - ls 1.00 - - #VALUE!
10 Bak air (fiber kap. 2 m3) - unit 2.00 - - #VALUE!
11 Pompa listrik + instalasi air dan penyambungan ke PDAM - unit 1.00 - - #VALUE!
12 Sal. Keliling pas bata diplester + gorong-gorong 1/2 dia. - m' 139.00 - - #VALUE!
13 Bak kontrol 40 x 40 cm - buah 12.00 - - #VALUE!
14 Grille penutup saluran teras - m' 55.50 - - #VALUE!
15 Ground Reservoir 2x5x2 m - buah 1.00 - - #VALUE!
16 Tempat wudhu lapis keramik + kran - buah 2.00 - - #VALUE!
Jumlah -
VIII PEK. CAT-CATAN, LAIN-LAIN
1 Cat tembok (plafond, dinding) setara Danacryl G.53.a m2 11,665.38 516,500.00 6,025,168,770.00 #VALUE!
2 Cat kilap/ kayu setara Dulux (2K6+K.23) m2 499.30 74,175.00 37,035,577.50 #VALUE!
3 Cat menie/ ter-teran - ls 1.00 - - #VALUE!
4 Reilling tangga steinlis/ void - m2 20.00 - - #VALUE!
Reilling tangga steinlis - m' 94.00 - - #VALUE!
Ukiran reilling tangga ulin - buah 12.00 - - #VALUE!
Plint karet injakan tangga - m' 133.20 - - #VALUE!
5 Pas. ubin keramik 40 x 40 (type rocktile) G.72 m2 2,744.62 68,546.00 188,132,722.52 #VALUE!
Pas. ubin keramik (lantai/ dinding toilet) G.72.c m2 494.60 63,546.00 31,429,851.60 #VALUE!
Pas. Dinding granit (luar depan, samping kanan kiri) - m2 197.50 - - #VALUE!
Logo dan tulisan DPRD kuningan/ stenlis - unit 1.00 - - #VALUE!
Dinding granit tempat logo - m2 9.00 - - #VALUE!
Ubin keramik 40 x 40 anti slip pada ram dan carport G.72/m2 m2 82.50 73,546.00 6,067,545.00 #VALUE!
Pasangan batu alam kel. Bangunan dan bawah tangga - m2 67.82 - - #VALUE!
Plint keramik 10 x 40 - m' 1,271.65 - - #VALUE!
6 Ukiran ulin pada dinding luar depan dan dahi lawang terpasang - ls 1.00 - - #VALUE!
7 Expose kolom diameter 40 keliling bangunan - buah 33.00 - - #VALUE!
Expose kolom diameter 50 depan bangunan - buah 10.00 - - #VALUE!
Expose kolom 50 x 50 pada aula - buah 6.00 - - #VALUE!
Expose kolom diameter 50 pada bordes lantai I dan dicat dengan - buah 2.00 - - #VALUE!
airbrush -
Expose kolom 40 x 40 pada ruang rapat/ sidang - buah 10.00 - - #VALUE!
Expose kolom diameter 40 pada void - buah 2.00 - - #VALUE!
Plesteran kolom - ls 1.00 - - #VALUE!
8 Bak bunga - buah 10.00 - - #VALUE!
9 Pentas lantai dasar dan lantai dua - unit 2.00 - - #VALUE!
10 Expose plesteran atap daag, listplank beton, geuvel G.50q+G.48 m2 2,073.26 22,316.10 46,267,077.49 #VALUE!
11 List plesteran dinding luar - m' 303.00 - - #VALUE!
12 Lapisan waterprofing (talang daag) - m2 350.00 - - #VALUE!
13 Plang nama gedung pada halaman kantor 5 x 2 m lapis keramik, - unit 1.00 - - #VALUE!
tulisan dan logo stenlis + pot bunga
14 Sunshiding beton variasi dg kayu dan cat - m' 94.00 - - #VALUE!
15 Ukiran dan panil ulin untuk background panggung lantai dasar - unit 1.00 - - #VALUE!
16 Ukiran dan panil ulin untuk background panggung lantai ruang - unit 1.00 - - #VALUE!
sidang
17 Tangga darurat besi - unit 1.00 - - #VALUE!
Jumlah 6,334,101,544.11
Satuan
Bobot
Harga Satuan Jumlah
No. Uraian Pekerjaan Analisa Volume
(Rp.) (Rp.)
B FASILITAS PENUNJANG (%)
I PEK. INSTALASI LISTRIK
1 Penyambungan daya PLN - paket 1.00 - - #VALUE!
2 Ohm saklar/ time swit (terpasang) - unit 1.00 - - #VALUE!
3 Panel utama - unit 1.00 - - #VALUE!
4 Panel pembagi (PHB I, PHB II, PHB III) - unit 3.00 - - #VALUE!
5 Panel AC - unit 3.00 - - #VALUE!
6 Panel sound system - unit 3.00 - - #VALUE!
7 Panel telepon - unit 3.00 - - #VALUE!
8 Kabel NYFGBY 4 x 120 mm2 - m' 128.00 - - #VALUE!
9 Kabel NYY 4 x 50 mm2 - m' 20.00 - - #VALUE!
10 Kabel NYY 4 x 35 mm2 - m' 19.00 - - #VALUE!
11 Kabel NYY 4 x 25 mm2 - m' 24.00 - - #VALUE!
12 Kabel NYY 4 x 16 mm2 - m' 12.00 - - #VALUE!
13 Kabel NYM 3 x 4 mm2 - m' 114.00 - - #VALUE!
14 Lampu TL 3 x 18 w + Rmo - buah 18.00 - - #VALUE!
15 Lampu TL 2 x 18 w + Rmo - buah 61.00 - - #VALUE!
16 Lampu baret SL 40 w - buah 14.00 - - #VALUE!
17 Lampu pijar 40 w - buah 41.00 - - #VALUE!
18 Lampu tanam (DL) SL 75 w - buah 174.00 - - #VALUE!
19 Lampu tanam (DL) Hollogen 50 w - buah 28.00 - - #VALUE!
20 Lampu dinding/ spotlight 25 w - buah 2.00 - - #VALUE!
21 Saklar tunggal - buah 40.00 - - #VALUE!
22 Lampu hias 300 w - buah 1.00 - - #VALUE!
23 Lampu hias 200 w - buah 2.00 - - #VALUE!
24 Stop kontak 200 w setara bravo warna - buah 66.00 - - #VALUE!
25 Instalasi (titik lampu + stop kontak) - titik 409.00 - - #VALUE!
26 Saklar ganda - buah 65.00 - - #VALUE!
27 Instalasi AC ceiling - unit 44.00 - - #VALUE!
Jumlah -
II PEK. INSTALASI PENANGKAL PETIR
1 Air terminal (rod type), tembaga murni, tinggi 30 cm, dia. 3/4" ujung - buah 6.00 - - #VALUE!
runcing
2 Support gip. Med class dia. 1" tinggi 50 cm - buah 6.00 - - #VALUE!
3 BC 50 mm2 - m 200.00 - - #VALUE!
4 Pentanahan lengkap dengan bak kontrol - titik 2.00 - - #VALUE!
5 Material bantu (klem, fisher, sekrup, dll) - ls 1.00 - - #VALUE!
Jumlah -
#VALUE! #VALUE!