Anda di halaman 1dari 394

I.

UPAH PEKERJA

NO. JENIS PEKERJA KODE SATUAN UPAH 2017 Rp UPAH 2018

kenaikan inflasi
6%

1 Pekerja L. 01 Hr 51,000.00 54,060.00


2 Tukang gali L. 02 Hr 55,000.00 58,300.00
3 Tukang batu L. 02 Hr 62,500.00 66,250.00
4 Tukang kayu L. 02 Hr 64,000.00 67,840.00
5 Tukang besi L. 02 Hr 64,000.00 67,840.00
6 Tukang cat L. 02 Hr 62,500.00 66,250.00
7 Tukang pipa L. 02 Hr 60,000.00 63,600.00
8 Tukang las L. 02 Hr 62,500.00 66,250.00
9 Tukang penganyam L. 02 Hr 60,000.00 63,600.00
10 Kepala Tukang L. 03 Hr 65,000.00 68,900.00
11 Mandor L. 04 Hr 67,000.00 71,020.00
12 Mekanik L. 07 Hr 62,500.00 66,250.00
13 Operator Alat Berat L. 08 Hr 62,500.00 66,250.00
14 Pembantu Operator L. 09 Hr 60,000.00 63,600.00
15 Supir L. 10 Hr 62,500.00 66,250.00
16 Penjaga Malam L. 12 Hr 52,000.00 55,120.00

7
UPAH 2018 Rp

pembulatan

54,000.00
58,000.00
66,000.00
68,000.00
68,000.00
66,000.00
64,000.00
66,000.00
64,000.00
69,000.00
71,000.00
66,000.00
66,000.00
64,000.00
66,000.00
55,000.00

7
II BAHAN TAMBAHAN

SATUAN
NO JENIS BAHAN

hollow m
metalroof m2
Penutup atap bitumen selulose motif genteng m2
Bubung atap bitumen selulose motif genteng m
Penutup atap bitumen selulose motif gelombang m
Bubung atap bitumen selulose motif gelombang m2
bata ekspose m2
Batu Bata Merah (biasa) m2
Batu Bata Merah (oven) m2
BATU HIAS
Batu tempel/palimanan/paras m2
Batu tempel hitam/candi m2
Batu marmo kuning m2
Batu alur (andesit) m2
Batu alur (candi) m2
Batu carport (koral bulat hitam/putih) m2
Batu andesit (hitam,abu-abu,hijau) 20x20 cm m2
Batu andesit (hitam,abu-abu,hijau) 30x30 cm m2
Batu andesit (hitam,abu-abu,hijau) 30x60 cm m2
Batu andesit (hitam,abu-abu,hijau) 40x40 cm m2
Batu basalt Brownis Alur ( Coklat) 15x30 cm m2
Sandstone rata mesin (putih) 20x20 cm m2
Sandstone rata mesin (putih) 20x40 cm m2
Sandstone rata mesin (putih) 40x40 cm m2
Batu koral Sikat Ambon (putih) m2
Batu koral Sikat Lampung ( hitam) m2
Batu koral Sikat flores ( hitam pekat,merah& hijau) m2
Batu koral Sikat Kupang (hitam,kehijauan) m2
Batu tempel/templek Salagedang 20x20cm m2
Batu tempel/templek Salagedang 20x40 cm m2
Batu tempel/templek Salagedang 30x30 cm m2
Batu tempel/templek Salagedang 30x60 cm m2
Batu tempel/templek Salagedang Acak m2
Batu tempel/templek Purwokarta 15 cmx30cm m2
Batu tempel/templek Purwokarta 20 x 20 cm m2
Batu tempel/templek Purwokarta 20 x 40 cm m2
Batu tempel/templek Purwokarta acak m2
Batu palimanan 10x20 cm m2
Batu palimanan 15x30 cm m2
Batu palimanan 20x20 cm m2
Batu palimanan 20x40 cm m2
Batu palimanan 30x30 cm m2
Batu candi 10x20 cm m2
Batu candi 15x30 cm m2
Batu candi 20x20 cm m2
SATUAN
NO JENIS BAHAN

Batu candi 20x40 cm m2


Batu candi 30x30 cm m2
kayu jati untuk konstruksi :
kayu jati kelas 1 m3
kayu jati kelas 2 m3
kayu jati kelas 3 m3
kayu jati untuk kusen m3
kayu jati kelas 1 m3
kayu jati kelas 2 m3
kayu jati jenis cat m3
kayu jati jenis plitur m3
precast U Ditch unit
Baja ringan canai dingin C75 kg
HARGA
(Rp)
HARGA
(Rp)
II BAHAN

SATUAN
NO JENIS BAHAN
I BAHAN TAMBANG
1 Batu Kali
Batu Belah m3
Pecah 15/20 m3
Pecah 10/15 m3
Pecah 5/7 m3
Pecah 3/5 m3
2 Kerikil Koral m3
Beton 0,5/1 m3
Beton 1/2 m3
Beton 2/3 m3
Sirtu m3
4 Pasir Urug m3
Pasang m3
Beton m3
5 Tanah Padas m3
Liat m3
6 Kapur Pasang m3
7 Portland Cement
Semen Abu-abu 40 kg zak
Semen Putih 40 kg zak
Semen Warna kg
3 Batu Bata ex lokal bh

II BAHAN PENUTUP ATAP

1 Sirap (100 lbr) (100 lbr) pak

2 Genteng Beton Genteng Beton Warna standard bh


Genteng Beton Warna Special bh
Kerpus Beton Warna Standard bh
Kerpus Beton Warna Special bh
3 Genteng Tanah Liat
Genteng Morando Jatiwangi bh
Genteng Kerpus Jatiwangi bh
Genteng Pres Ex. Mojolaban bh
Genteng Kerpus Ex. Mojolaban bh
Genteng Morando Kebumen bh
Genteng Magas Kebumen bh
Genteng Kerpus Kebumen bh
4 Asbes Gelombang Besar
200 cm X 102 cm X 5 mm bh
240 cm X 102 cm X 5 mm bh
300 cm X 102 cm X 5 mm bh
Asbes Gelombang Kecil
150 cm X 105 cm X 4 mm bh
180 cm X 105 cm X 4 mm bh
210 cm X 105 cm X 4 mm bh
240 cm X 105 cm X 4 mm bh
270 cm X 105 cm X 4 mm bh
300 cm X 105 cm X 4 mm bh
Nok Jabes Nok
Stel Besar bh
Paten Besar bh
Nokstell Gelombang Harflex
Stel Besar bh
Paten Besar bh

5 Fiber Glass (Jabes)


180 X 92 cm bh
200 X 92 cm bh
250 X 92 cm bh
180 X 105 cm bh
210 X 105 cm bh
240 X 105 cm bh
6 Seng Plat
Seng Talang BJLS 30 lebar 60 cm m'
Seng Talang BJLS 30 lebar 90 cm m'
7 Seng Gelombang
Seng Gelombang (180 x 90) tbl. 0,2 lbr
Seng Gelombang (240 x 90) tbl. 0,2 lbr

III BAHAN KAYU


1 Jati Papan m3
Balok m3
2 Kamper Papan m3
Balok m3
3 Kruing Papan m3
Balok m3
4 Meranti Papan m3
Balok m3
5 Bengkirai Papan m3
Balok m3
6 Sengon m3

7 Dolken bt
8 Bambu bt

IV BAHAN PENUTUP DINDING/LANTAI


1 Ubin (Tegel Biasa)
PC polos 30 X 30 cm m2
20 X 20 cm m2
PC warna 30 X 30 cm m2
20 X 20 cm m2
2 Tegel Plint PC warna 10 x 30 cm 10 X 30 cm bh
Tegel Plint PC warna 10 x 20 cm 10 X 20 cm bh
Tegel Plint PC abu-abu 10 x 20 cm bh
10 x 30 cm bh
3 Keramik 30 X 30 cm (Ex. Asia) m2
40 X 40 cm (Ex. Asia) m2
20 x 20 cm (Ex. Asia) m2
20 x 25 cm (Ex. Asia) m2
Tegel Plint PC Warna 10 x 40 cm 10 X 40 cm bh
4 Parquet Jati m2

5 Batu Paras m2

6 Batu Candi m2

7 Batu Andesit m2
Batu Tempel Hitam m2
8 Granito 40 x 40 cm m2
30 x 30 cm m2
9 Marmer m2

V BAHAN CETAK
1 Buis Beton
Ø 20 cm - 100 cm bh
Ø 30 cm - 100 cm bh
Ø 40 cm - 100 cm bh
Ø 50 cm - 100 cm bh
Ø 60 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh
U 20 cm - 100 cm bh
U 30 cm - 100 cm bh

2 Lubang Angin (Roster)


Roster Beton bh

VI BAHAN BESI
1 Besi Beton kg
2 Besi Plat (Besi Strip) Besi Strip kg
3 Besi Profil (Besi Profil) Besi Profil kg
4 Kawat
- Kawat Beton/Bendrat kg
- Kawat Harmonika kg
- Kawat Nyamuk Nylon m2
- Kawat Kasa m2
- Saringan Pasir m2
- Kawat Duri rol
- Kawat Bronjong kg
- Kawat Las Listrik kg
5 Hollow Galvanis
- Hollow Galvanis 4/4 cm tebal 0,65 mm btg
- Hollow Galvanis 2/4 cm tebal 0,65 mm btg
6 Pagar BRC
- Pagar BRC HD 60 (60 x 240) lbr
- Pagar BRC HD 90 (90 x 240) lbr
- Pagar BRC HD 120 (120 x 240) lbr
- Pagar BRC HD 150 (150 x 240) lbr
- Pagar BRC HD 175 (175 x 240) lbr
- Pagar BRC HD 190 (190 x 240) lbr
7 Folding Gate (Delux P Tb : 0,8 mm) m2
8 Pintu Lipat Besi m2
9 Kusen Aluminium Colkat m'
10 Kusen Aluminium Silver m'
11 Rolling Door Aluminium m2

VII BAHAN PIPA


1 Pipa PVC
Pipa PVC Ǿ ½" / 4m btg
Pipa PVC Ǿ ¾" / 4m btg
Pipa PVC Ǿ 1" / 4m btg
Pipa PVC Ǿ 1½" / 4m btg
Pipa PVC Ǿ 2" / 4m btg
Pipa PVC Ǿ 3"/ 4m btg
Pipa PVC Ǿ 4" / 4m btg
Pipa PVC Ǿ 2 1/2" / 4m btg
2 Pipa Medium B Galvanis
Pipa Medium B Galvanis ½" btg
Pipa Medium B Galvanis ( ¾" ) btg
Pipa Medium B Galvanis ( 1" ) btg
Pipa Medium B Galvanis ( 1½" ) btg
Pipa Medium B Galvanis ( 2" ) btg
Pipa Medium B Galvanis 2½" btg

VIII BAHAN LANGIT - LANGIT


1 AKUSTIK : 30 X 30 cm lbr
30 X 60 cm lbr
60 X 120 cm lbr
2 List Kayu Profil m'
3 Soft Board 4" x 8" 4'X 8' lbr
Gypsum tebal 9 mm lbr
4 Hard Board 4" x 8" 4'X 8' lbr

5 Ply Wood
Teak Wood
90 X 210 (3 mm) X 3 mm lbr
120 X 240 (3 mm) X 3 mm lbr
Tripleks lbr
120 X 240 (3 mm) X 3 mm lbr
120 X 240 (4 mm) X 4 mm lbr
120 X 240 (6 mm) X 6 mm lbr
Multipleks
120 X 240 (9 mm) X 9 mm lbr
120 X 240 (12 mm) X 12 mm lbr
120 X 240 (15 mm) X 15 mm lbr
120 X 240 (18 mm) X 18 mm lbr
6 Woodplank (4 m) lbr
7 Eternit (1m x 1m) lbr

IX BAHAN FINISHING
1 Kayu
Menie kg
Dempul plamur kg
Ambril/amplas lbr
Cat dasar kg
Emco kg
Kuas bh
Envilux ltr
Wood Filler kg
Wood Stain ltr
Spiritus ltr

2 Tembok
Plamir kg
Cat Tembok (dalam) Ex. Catylac 5 kg
Cat Tembok (luar) Ex. Mowilex 2,5 kg

3 Besi
Menie kg
Cat mengkilat kg
Cat kg
Thinner B ltr
Thinner Super ltr

4 Cat Genteng 2,5 ltr

X BAHAN KACA Bening 3 mm m2


1 BENING Bening 5 mm m2
Bening 8 mm m2
2 Es Kabur 5 mm 5 mm m2
3 Ray Band 5 mm 5 mm m2
4 Cermin 5 mm 5 mm m2

XI BAHAN INSTALASI LISTRIK


1 Kabel Listrik
N Y A (1 x 1 1/2 mm) 1 X 1 1/2 mm m'
N Y A (1 x 2 1/2 mm) 1 X 2 1/2 mm m'
N Y A (1 x 4 mm) 1 X 4 mm m'
N Y Y (2 x 1 1/2 mm) 2 X 1 1/2 mm m'
N Y Y (2 x 2 1/2 mm) 2 X 2 1/2 mm m'
N Y Y (3 x 1 1/2 mm) 3 X 1 1/2 mm m'
N Y Y (3 x 2 1/2 mm) 3 X 2 1/2 mm m'
N Y Y (3 x 4 mm) 3 X 4 mm m'
N Y M (2 x 1 1/2 mm) 2 X 1 1/2 mm m'
N Y M (2 x 2 1/2 mm) 2 X 2 1/2 mm m'
N Y M (3 x 4 mm) 3 X 4 mm m'

2 Sakelar
In bauw Seri Seri bh
In bauw Engkel Engkel bh

3 Fuse Box (Sekering Biasa)


1 group bh
2 group bh
3 group bh

4 Steker Biasa bh
Arde bh
T Biasa bh
T dengan Arde bh

5 Fitting Kap bh
Kombinasi bh

6 Stop Kontak
Stop Kontak In Bow bh
Stop Kontak AC bh

XII ALAT - ALAT PENGUNCI & PENGGANTUNG


1 Kunci Tanam Union 1 x slag bh
Union 2 x slag bh
Yale 1 x slag bh
Yale 2 x slag bh
Kuda 1 x slag bh
Kuda 2 x slag bh
Kunci Silinder bh
2 Engsel dan Grendel
Engsel Angin bh
Kupu-kupu biasa bh
Nylon kupu-kupu bh
Espagnoled lokal bh
Grendel biasa bh
Kait Angin bh
Door Stop bh
Door closer bh
XIII BAHAN SANITAIR
1 Kloset Duduk Ex. TOTO bh
2 Kloset Jongkok Ex. TOTO bh
3 Wastafel Ex. TOTO bh
4 Wasbak 1 Lubang bh
5 Tempat Sabun Tanam bh
6 Kran Air bh
7 Tangki Air Merk Penguin 500 ltr
8 Tangki Air Merk Penguin 1000 ltr
9 Floor Drain bh
10 Seal Tafe bh
11 Urinoir bh
XIV ALAT PENGIKAT KAYU
1 Paku Usuk kg
2 Paku - reng kg
3 Paku - triplek kg
4 Paku - payung kg
5 Paku - sekrup kg
6 Paku - beton kg
7 Mur Baut (kuda-kuda) kg
8 Angkur Baut bh
9 Lem Kayu bh
10 Tali Ijuk kg

XV POMPA AIR
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh
2 POMPA AIR LISTRIK
Sanyo . 125 watt bh
Shimizu . 125 watt bh
Dab . 125 watt bh

XVI PAVING BLOCK


1 Paving tebal 8 cm (lokal) m2
2 Paving tebal 6 cm (lokal) m2
3 Paving tebal 6 cm K. 250 (abu-abu) m2
4 Paving tebal 6 cm K. 250 (merah) m2
5 Paving tebal 6 cm K. 250 (biru) m2
6 Paving tebal 6 cm K. 250 (kuning) m2
7 Paving tebal 8 cm K. 300 (abu-abu) m2
8 Paving tebal 8 cm K. 300 (merah) m2
9 Paving tebal 8 cm K. 300 (kuning) m2
10 Paving tebal 8 cm K. 300 (hijau) m2
11 Paving tebal 8 cm K. 300 (biru) m2
12 Kanstin (A1/40) bj
13 Kanstin (B2,B6/50 cm) bj
14 Kanstin (K3) bj
15 Kanstin (K5) bj
16 Raam (65 cm) bj
17 Raam (30 cm) bj
18 Paving Difabel bj
19 Grass Block m2

XVII LAIN -LAIN


1 Naco per Daun bh
2 Minyak Beton & bekisting ltr
3 Air ltr
4 Solar ltr
5 Minyak pelumas ltr
6 Besi Scuare Tube
7 Besi Lis Kaca (1 x 1) cm
8 Sunscreen Alluminium
9 Lem kayu kg
10 Formika lb
11 Soda Api kg
12 Sabun kg
13 Residu atau Ter lt
14 Wallpaper m2
15 Sewa Alat jam
16 Keramik 30 X 30 cm (Ex. Roman) m2
40 X 40 cm (Ex. Roman) m2
20 x 20 cm (Ex. Roman) m2
20 x 25 cm (Ex. Roman) m2
17 HB-10 bh
18 Semen Merah m3
19 Bilik Bambu m2
20 List Kayu 2/4 m1
21 Genteng Kodok bh
22 Genteng Kodok Glazuur bh
23 Kerpus Kodok bh
24 Kerpus Kodok Glazuur bh
25 Genteng Metal ex Rainbow (Stone) m2
26 Harflex Motif Sirap lbr
27 Nok Genteng Metal (NAS) bh
28 Bak fibreglass bh
29 Porselen 11 x 11 cm bh
30 Water Drain bh
31 Door Holder bh
32 Kunci Slot bh
33 Rel Pintu set
34 Kunci Tanam Antik bh
35 Kunci Lemari bh
36 Kaca Patri 7 mm (Timah) m2
37 Kaca Cermin 5 mm m2
38 Kaca Buram 5 mm m2
39 Sealant tube
40 Asbes Langit-Langit m2
41 Asbes Semen m2
42 Profil Allum"T" m
43 Kawat dia 4 mm kg
44 Ramset bh
45 Ubin Teralux 40 x 40 cm bh
46 Ubin Teralux 30 x 30 cm bh
47 Ubin Teralux Marmer 60 x 60 cm bh
48 Ubin Teralux Marmer 40 x 40 cm bh
49 Ubin Teralux Marmer 30 x 30 cm bh
50 Sunscreen Alluminium m2
51 Skrup Fixer bh
52 Alumunium Strip m
53 Profil Kaca m
54 Vertical Blinds m2
55 Paku Skrup bh
56 Keramik 33 x 33 cm (Ex. Roman) m2
57 Ubin Teralux Marmer 100 x 100 cm bh
58 Paving tebal 8 cm (lokal) m2
59 Paving tebal 6 cm (lokal) m2
60 Paving tebal 8 cm SNI (Ex. Diamond) m2
61 Paving tebal 6 cm SNI (Ex. Diamond) m2
62 Keramik 10 x 33 cm bh
63 Keramik 10 x 20 cm bh
64 Keramik 10 x 10 cm bh
65 Keramik 5 x 20 cm bh
66 Marmer 100 x 100 cm bh
67 Karpet m2
68 Porselen 11 x 11cm bh
69 Keramik Artistik 10 cm x 20 cm bh
70 Keramik Artistik 5 cm x 20 cm bh
71 Paku 12 cm bh
72 Plint Vynil 10cm m
73 Lantai Vynil Ukuran 15 cm x 120cm m2

74 Reng Jati m3
75 Reng Jati 3/4 m3
76 Tali rapia m
77 Karung Plastik bh
78 Batu Muka m2
79 Geotekstil m3
80 Kalsiboard 6 mm lbr
81 GRC 6 mm lbr
- Hollow GT 2/4 tebal 0,4 mm btg
- Hollow GT 4/4 tebal 0,4 mm btg
5 Paving tebal 6 cm K. 250 (hijau) m2
Cermin 3 mm m2
Kaca Patri 7 mm (Kuningan) m2
Es Kabur 3 mm m2
Polikarbonat Twinlite 5 mm (2.1 x 11.8 m) lbr
lbr
HARGA HARGA
(Rp) (Rp)

195,000 200,000
215,000 215,000
220,000 220,000
225,000 225,000
230,000 230,000
150,000 150,000
270,000 270,000
260,000 260,000
240,000 240,000
145,000 145,000
125,000 130,000
170,000 210,000
185,000 225,000
50,000 65,000
50,000 65,000
270,000 270,000

59,800 59,800
92,500 92,500
17,000 17,000
700 700

170,000 190,000 175000 192500


0
5,000 9,500 7,600 0
8,000 10,300 0
6,000 19,000 0
7,900 22,000 0
0
4,000 4,500 4000 4400
8,500 8,500 0
1,800 2,000 0
5,300 5,500 0
4,000 4,500 0
3,000 3,000 0
7,500 7,500 0
0
80,000 87,500 0
85,000 100,000 0
95,000 125,000 0
0
50,000 52,000 0
58,500 58,500 0
68,000 68,000 0
77,500 77,500 0
88,000 88,000 0
96,500 96,500 0
0
50,000 58,000 0
45,000 75,000 0
0
44,500 45,000 0
27,500 33,000 0
0
0
48,000 81,000 0
55,000 0
70,000 0
50,000 0
59,000 94,300 0
73,000 107,000 0
0
38,500 0
40,200 0
0
45,400 0
57,800 0
0
0
22,000,000 0
20,500,000 0
10,250,000 10,250,000 0
9,100,000 9,100,000 0
7,500,000 7,500,000 0
6,100,000 6,730,000 0
6,400,000 0
5,700,000 0
14,000,000 0
12,100,000 0
2,150,000 0
0
0
24,000 25,000 0
12,000 13,000 0
0
0
0
0
40,000 0
38,000 0
45,000 0
35,000 0
10,500 0
8,500 0
8,000 0
10,000 0
45,000 0
59,000 0
52,000 0
55,000 0
15,000 0
240,000 0
0
105,000 0
0
115,000 0
0
155,000 170,000 0
92,500 0
205,000 0
250,000 0
475,000 0
0
0
0
60,000 0
65,000 0
75,000 0
85,000 0
90,000 0
110,000 0
150,000 0
40,000 0
50,000 0
0
215,000 0
0
8,000 10,000 0
0
0
12,650 12,650 0
12,650 12,650 0
13,800 13,800 0
0
19,800 19,800 0
35,000 40,000 0
35,000 35,000 0
37,500 37,500 0
15,000 15,000 0
155,000 155,000 0
16,000 16,000 0
40,000 40,000 0
0
38,000 0
31,000 0
0
189,000 190,000 165000 181500
210,500 215,000 195000 214500
243,000 260,000 243000 267300
378,000 378,000 273000 300300
440,000 450,000 416000 457600
495,000 495,000 439000 482900
1,750,000 0
385,000 0
80,000 0
72,000 0
525,000 0
0
0
0
22,500 22,500 0
28,700 28,700 0
39,200 39,200 0
67,600 67,600 0
86,500 86,500 0
170,100 170,100 0
281,700 281,700 0
120,000 120,000 0
0
90,000 90,000 0
117,000 117,000 0
153,000 153,000 0
212,400 212,400 0
260,000 260,000 0
310,000 310,000 0
0
0
5,300 15,000 0
12,000 25,000 0
38,000 38,000 0
4,200 7,000 0
70,000 0
75,000 75,000 69,000 75900
64,000 65,000 0
0
0
0
72,000 95,700 87,000 95700
76,000 99,000 90,000 99000
0
45,000 49,500 45,000 49500
60,000 62,700 57,000 62700
79,000 79,000 67,500 74250
0
121,000 121,000 90,000 99000
152,000 155,000 145,000 159500
202,000 203,500 185,000 203500
215,000 230,000 210,000 231000
79,000 79,000 0
16,000 20,000 0

25,000 28,000
25,000 28,000
4,000 4,000
36,000 36,000
58,000 59,000
13,000 14,000
62,000 62,000
38,000 38,000
60,000 63,000
12,000 12,000

27,000 27,000
150,000 150,000
250,000 250,000

45,000 45,000
48,000 50,000
46,000 52,000
14,500 16,000 16,000
22,000 24,000 22,000

149,000 185,000

80,000 82,000 80,000


110,000 115,000 110,000
280,000 280,000 240,000
160,000 160,000 140,000
120,000 125,000 120,000
240,000 245,000 240,000

4,000
5,000
7,500
8,600
15,000
13,000
20,000
35,000
8,000
10,500
31,000
23,500
14,000

120,000
230,000
330,000

12,000
15,000
14,000
21,000

14,000
21,000

17,500
72,000

52,000
67,000
80,000
135,000
50,000
60,000
145,000

20,000
18,000
16,000
38,000
9,500 9,500 7000-8000
16,000 16,000 13,000
62,000
350,000

2,460,000 2,460,000
459,000 459,000
900,000 900,000
250,000 250,000
32,000 35,000
50,000 70,000
1,100,000 1,100,000
1,750,000 1,750,000
35,000 40,000
8,750 9,000
1,649,000 1,800,000

14,000 14,000
20,000 20,000
20,000 20,000
27,500 27,500
14,000 14,000
20,000 20,000
14,000 14,000
13,000 13,000
18,000 18,000
6,000 6,000

320,000

575,000
450,000
520,000

81,585 98,500 4,750.00 99,750.00


68,250 72,400 3,450.00 72,450.00
95,300 99,600 86,650 99,647.50
116,700 121,000 105,250 121,037.50
213,100 213,500 185,300 213,095.00
146,600 148,300 129,000 148,350.00
134,200 139,700 121,500 139,725.00
151,800 160,400 139,500 160,425.00
191,300 191,300 166,300 191,245.00
217,600 217,600 189,200 217,580.00
279,500 297,500 243,000 279,450.00
82,400 86,800 75,500 86,825.00
39,700 43,100 37,550 43,182.50
40,200 51,100 44,500 51,175.00
35,900 46,500 40,500 46,575.00
74,400 78,700 68,500 78,775.00
40,100 46,100 40,100 46,115.00
45,900 52,700 45,900 52,785.00
104,950 126,500 110,000 126,500.00

15,000 37,500 37,500


9,000 9,000
50 50
13,000 13,000
35,000 35,000

25,000
75,000
12,000
12,000
8,500
50,000
45,000
97,000
116,500
105,000
95,000
4,000
185,000
22,000
4,500
2,500
5,000
7,500
8,500
229,500
35,000
45,000
275,000
450
55,000
125,000
20,000
235,000
160,000
20,000
2,750,000 2,750,000
235,000
160,000 200,000
75,000

6,500
16,000
22,000

95,400
38,200
20,200
325,000
700
5,000
8,000
113,850
150
102,000
95,400
74,000
60,500
98,000
77,000
5,200
2,650
5,250
5,200
480,000
127,500
500
1,000
1,550
500
6,100 65,000
12,500 250,000

8,625,000
8,625,000
500
1,500
32,000
40,000
125,000
155,000 155,000
25,000
29,000
166,400 170,000 148,500 170,775
150,000
3,750,000
120,000
2,700,000 2,700,000
-
HARGA SATUAN POKOK KEGIATAN (HSPK)
PEKERJAAN KONSTRUKSI DIKONTRAKAN (TANPA PPN)
PEMERINTAH KOTA SURAKARTA TAHUN 2018
UNTUK PEKERJAAN TANPA ALAT BERAT

KODE URAIAN PEKERJAAN SATUAN

A.2.2.1. Pekerjaan persiapan


1 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter m2
2 Pengukuran dan pemasangan Bouwplank m1
3 Pembersihan lapangan dan perataan m2
4 Pembuatan steger/perancah dari bambu m2
5 Pembongkaran beton bertulang m3
6 Pembongkaran dinding tembok m2
A.2.3.2. Pekerjaan tanah
1 Penggalian tanah biasa sedalam 1 m m3
2 Penggalian tanah biasa sedalam 2 m m3
3 Penggalian tanah biasa sedalam 3 m m3
4 Penggalian tanah keras sedalam 1 m m3
5 Penggalian tanah cadas sedalam 1 m m3
6 Penggalian tanah lumpur sedalam 1 m m3
7 Pengerjaan stripping tanah tebing setinggi 1 m m2
8 Pembuangan tanah sejauh 30m m3
9 Pengurugan kembali galian m3
10 Pemadatan tanah per 20 cm m3
11 Pengurugan dengan pasir urug m3
12 Pemasangan lapisan pudel 1:3:7 m3
13 Pemasangan lapisan ijuk m3
14 Pengurugan dengan sirtu padat m3
A.3.2.1. Pekerjaan pondasi
1 Pemasangan pondasi batu belah 1PC:3PP m3
2 Pemasangan pondasi batu belah 1PC:4PP m3
3 Pemasangan pondasi batu belah 1PC:5PP m3
4 Pemasangan pondasi batu belah 1PC:6PP m3
5 Pemasangan pondasi batu belah 1PC:8PP m3
6 Pemasangan pondasi batu belah 1KP:1SM:2 PP m3
7 Pemasangan pondasi batu belah 1PC:3KP:10 PP m3
8 Pemasangan pondasi batu belah 1/4SP:1KP:4 PP m3
9 Pemasangan batu kosong (aanstamping) m3

10 Pemasangan pondasi siklop, 60% beton campuran 1 SP : 2 PB : 3 KR dan 40% batu belah m3

11 Pemasangan pondasi sumuran Ø 100cm m3


A.4.1.1. Pekerjaan beton
1 Pembuatan beton mutu fc = 7,4 MPa (K100) m3
2 Pembuatan beton mutu fc = 9,8 MPa (K125) m3
3 Pembuatan beton mutu fc = 12,2 MPa (K150) m3
4 Pembuatan lantai kerja beton mutu fc = 7,4 Mpa m3
5 Pembuatan beton mutu fc = 14,5 MPa (K175) m3
6 Pembuatan beton mutu fc = 16,9 MPa (K200) m3
7 Pembuatan beton mutu fc = 19,3 MPa (K225) m3
8 Pembuatan beton mutu fc = 21,7 MPa (K250) m3
9 Pembuatan beton mutu fc = 24 MPa (K275) m3
10 Pembuatan beton mutu fc = 26,4 MPa (K300) m3
11 Pembuatan beton mutu fc = 28,8 MPa (K325) m3
12 Pembuatan beton mutu fc = 31,2 MPa (K350) m3
17 Pembesian dengan besi polos atau ulir 10 kg
19 Pemasangan Jaring kawat baja (wiremesh) 10 kg
20 Pemasangan bekisting untuk pondasi m2
21 Pemasangan bekisting untuk sloof m2

25
KODE URAIAN PEKERJAAN SATUAN

22 Pemasangan bekisting untuk kolom m2


23 Pemasangan bekisting untuk balok m2
24 Pemasangan bekisting untuk lantai m2
25 Pemasangan bekisting untuk dinding m2

26
KODE URAIAN PEKERJAAN SATUAN

26 Pemasangan bekisting untuk tangga m2


27 Pemasangan jembatan untuk pengecoran beton m2
28 Pembuatan pondasi beton bertulang (150 kg besi + bekisting) m3
29 Pembuatan sloof beton bertulang (200 kg besi + bekisting) m3
30 Pembuatan kolom beton bertulang (300 kg besi + bekisting) m3
31 Pembuatan balok beton bertulang (200 kg besi + bekisting) m3
32 Pembuatan plat beton bertulang (150 kg besi + bekisting) m3
33 Pembuatan dinding beton bertulang (150 kg besi + bekisting) m3
34 Pembuatan dinding beton bertulang (200 kg besi + bekisting) m3
35 Pembuatan 1 m1 kolom praktis beton bertulang (11x11) cm m1
36 Pembuatan 1 m2 ring balok beton bertulang (10x15) cm m2
A.4.2.1. Pekerjaan Besi & Alumunium
1 Pemasangan baja profil kg
2 Pemasangan rangka kuda-kuda baja IWF kg
3 Pengerjaan perakitan baja 100 kg
4 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku m2
5 Pengerjaan pengelasan dengan las listrik 10 cm
6 Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC m2
7 Pemasangan 1 m2 rolling door alluminium m2
8 Pemasangan 1 m kusen pintu alluminium m
9 Pemasangan 1 m2 pintu alluminium strip lebar 8 cm m
10 Pemasangan 1 m2 pintu kaca rangka alluminium m2
11 Pemasangan 1 m2 venetions blinds dan Vertical blinds m2
12 Pemasangan 1 m2 terali besi strip (2 x 3) mm m2
13 Pemasangan 1 m2 kawat nyamuk m2
14 Pemasangan 1 m2 jendela nako & tralis m2
15 Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm m
16 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm m

17 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi m2

18 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon m2


A.4.4.1. Pekerjaan Dinding
1 Pemasangan dinding bata merah 1 batu camp. 1PC:2PP m2
2 Pemasangan dinding bata merah 1 batu camp. 1PC:3PP m2
3 Pemasangan dinding bata merah 1 batu camp. 1PC:4PP m2
4 Pemasangan dinding bata merah 1 batu camp. 1PC:5PP m2
5 Pemasangan dinding bata merah 1 batu camp. 1PC:6PP m2
6 Pemasangan dinding bata merah 1 batu 1PC:3KP: 2PP m2
7 Pemasangan dinding bata merah 1/2 batu camp. 1PC:2PP m2
8 Pemasangan dinding bata merah 1/2 batu camp. 1PC:3PP m2
9 Pemasangan dinding bata merah 1/2 batu camp. 1PC:4PP m2
10 Pemasangan dinding bata merah 1/2 batu camp. 1PC:5PP m2
11 Pemasangan dinding bata merah 1/2 batu camp. 1PC:6PP m2
12 Pemasangan dinding bata merah 1/2 batu 1PC:8PP m2
13 Pemasangan dinding bata merah 1/2 batu 1PC:3KP: 10PP m2
14 Pemasangan dinding bata merah 1/2 batu 1KP:1SM:1PP m2
15 Pemasangan dinding bata merah 1/2 batu 1KP:1SM:2PP m2
20 Pemasangan dinding HB10 camp. 1PC:3PP m2
21 Pemasangan dinding HB10 camp. 1PC:4PP m2
22 Pemasangan dinding terawang (roster) camp. 1PC:3PP m2
23 Pemasangan dinding terawang (roster) camp. 1PC:4PP m2
24 Pemasangan dinding bata berongga ekspose camp. 1PC:3PP m2
A.4.4.2. Pekerjaan Plesteran
1 Pemasangan plesteran 1PC:1PP tebal 15 mm m2
2 Pemasangan plesteran 1PC:2PP tebal 15 mm m2
3 Pemasangan plesteran 1PC:3PP tebal 15 mm m2
4 Pemasangan plesteran 1PC:4PP tebal 15 mm m2
5 Pemasangan plesteran 1PC:5PP tebal 15 mm m2

27
KODE URAIAN PEKERJAAN SATUAN

6 Pemasangan plesteran 1PC:6PP tebal 15 mm m2


7 Pemasangan plesteran 1PC:7PP tebal 15 mm m2
8 Pemasangan plesteran 1PC:8PP tebal 15 mm m2
9 Pemasangan plesteran 1PC:1/2KP:3PP tebal 15 mm m2
10 Pemasangan plesteran 1PC:2KP:8PP tebal 15 mm m2

28
KODE URAIAN PEKERJAAN SATUAN

11 Pemasangan plesteran 1SM:1KP:1PP tebal 15 mm m2


12 Pemasangan plesteran 1SM:1KP:2PP tebal 15 mm m2
13 Pemasangan plesteran 1PC:1PP tebal 20 mm m2
14 Pemasangan plesteran 1PC:3PP tebal 20 mm m2
15 Pemasangan plesteran 1PC:4PP tebal 20 mm m2
16 Pemasangan plesteran 1PC:5PP tebal 20 mm m2
17 Pemasangan plesteran 1PC:6PP tebal 20 mm m2
18 Pemasangan plesteran 1SM:1KP:2PP tebal 20 mm m2
19 Pemasangan berapen 1PC:5PP tebal 15 mm m2
20 Pemasangan plesteran skoning 1PC:3PP lebar 10 cm m2
23 Pemasangan plesteran ciprat 1PC:2PP m2
24 Pemasangan finishing siar pasangan bata merah m2
25 Pemasangan finishing siar pas. Conblock ekpose m2
26 Pemasangan finishing siar pas. batu kali 1SP : 2 PP m2
27 Pemasangan acian m2
4.4.3 Pekerjaan penutup lantai & penutup dinding
2 Pemasangan 1m2 lantai ubin PC abu-abu ukuran 30cm x30 cm m2
3 Pemasangan 1m2 lantai ubin PC abu-abu ukuran 20cm x20 cm m2
5 Pemasangan 1m2 lantai ubin PC warna ukuran 30cm x30cm m2
6 Pemasangan 1m2 lantai PC ubin warna ukuran 20cm x20cm m2
9 Pemasangan 1m2 lantai ubin granit ukuran 40cm x40cm m2
10 Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm m2
11 Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm m2
13 Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm m2
16 Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 15cm x 20cm m’
17 Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm m’
19 Pemasangan 1 m’ plint ubin warna ukuran 10cm x 20cm m’
20 Pemasangan 1 m’ plint ubin warna ukuran 10cm x 30cm m’
21 Pemasangan 1 m’ plint ubin warna ukuran 10cm x 40cm m’
32 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm m’
34 Pemasangan 1m2 lantai keramik ukuran 33cm x 33cm m2
35 Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm m2
36 Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm m2
37 Pemasangan 1m2 lantai keramik ukuran 10cm x 33cm untuk variasi/border m2
39 Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm m’
40 Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm m’
41 Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m’
43 Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm m2
44 Pemasangan 1 m2 lantai karpet m2
46 Pemasangan 1 m2 lantai parquet kayu m2
48 Pemasangan 1 m2 dinding porselen 11 x 11 cm m2
51 Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm m2
52 Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm m2
53 Pemasangan 1 m2 dinding keramik 10cm x 20cm m2
54 Pemasangan 1 m2 dinding keramik 20cm x 20cm m2
55 Pemasangan 1 m2 dinding marmer 100cm x 100cm m2
56 Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm m2
57 Pemasangan 1 m2 dinding batu paras m2
58 Pemasangan 1 m2 dinding batu tempel hitam m2
59 Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm m2
60 Pemasangan 1 m2 wallpaper lebar 50 cm m2
62 Pemasangan 1 m’ plint vynil 15cm x 30cm m’
63 Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm m’
4.5.1 Pekerjaan Plafond
1 Pemasangan langit-langit asbes semen 4,5,6 mm m2
2 Pemasangan langit-langit akustik 30x30 m2
3 Pemasangan langit-langit akustik 30x60 m2
4 Pemasangan langit-langit akustik 60x120 m2

29
KODE URAIAN PEKERJAAN SATUAN

5 Pemasangan langit-langit tripleks ukuran (120 x 240) tebal 3,4,6 mm m2


6 Pemasangan langit-langit lambrisering kayu, tebal 9 mm m2
7 Pemasangan langit-langit gypsum board ukuran (120 x 240) cm, tebal 9 mm m2
8 Pemasangan langit-langit akustik ukuran (60 x 120) berikut rangka allumunium m2
9 Pemasangan list langit-langit kayu profil m2

30
KODE URAIAN PEKERJAAN SATUAN

4.5.2 Pekerjaan Penutup atap


1 Pemasangan atap genteng palentong kecil m2
2 Pemasangan atap genteng kodok glazuur m2
3 Pemasangan atap genteng palentong besar/super m2
4 Pemasangan bubung genteng palentong kecil m2
5 Pemasangan bubung genteng kodok glazuur m2
6 Pemasangan bubung genteng palentong besar m2
8 Pemasangan atap asbes gelombang 92x250 tebal 5 mm m2
9 Pemasangan atap asbes gelombang 92x225 tebal 5 mm m2
10 Pemasangan atap asbes gelombang 92x200 tebal 5 mm m2
11 Pemasangan atap asbes gelombang 92x180 tebal 5 mm m2
12 Pemasangan atap asbes gelombang 105x300 tebal 4 mm m2
13 Pemasangan atap asbes gelombang 105x270 tebal 4 mm m2
14 Pemasangan atap asbes gelombang 105x240 tebal 4 mm m2
15 Pemasangan atap asbes gelombang 105x210 tebal 4 mm m2
16 Pemasangan atap asbes gelombang 105x150 tebal 4 mm m2
17 Pemasangan atap asbes gelombang 108x300 tebal 6 mm m2
18 Pemasangan atap asbes gelombang 108x270 tebal 6 mm m2
19 Pemasangan atap asbes gelombang 108x240 tebal 6 mm m2
20 Pemasangan atap asbes gelombang 108x210 tebal 6 mm m2
21 Pemasangan atap asbes gelombang 108x180 tebal 6 mm m2
22 Pemasangan bubung stel gelombang 92 cm m2
23 Pemasangan nok stel gelombang 105 cm m2
24 Pemasangan nok stel gelombang 108 cm m2
25 Pemasangan nok paten 92 cm m2
26 Pemasangan nok paten 105 cm m2
27 Pemasangan nok paten 108 cm m2
28 Pemasangan nok stel rata 92 cm m2
29 Pemasangan nok stel rata 105 cm m2
30 Pemasangan atap genteng beton m2
32 Pemasangan atap genteng metal m2
33 Pemasangan atap sirap kayu m2
34 Pemasangan nok genteng beton m2
36 Pemasangan nok genteng metal m2
37 Pemasangan nok atap sirap m2
38 Pemasangan atap seng gelombang m2
39 Pemasangan nok atap seng m2
A.4.6.1. Pekerjaan Kayu
1 Pembuatan & pemasangan kusen kayu kelas I (Jati) m3
2 Pembuatan & pemasangan kusen kayu kelas II dan III (Kamfer) m3
3 Pembuatan & pemasangan kayu klam kayu kelas II (Kamfer) m2
4 Pembuatan & pemasangan pintu klam kayu kelas III (Meranti) m2
5 Pembuatan & pemasangan pintu panel kayu kelas I atau II (Jati) m2
6 Pembuatan & pemasangan pintu/jendela kaca kayu kelas I atau II (Jati) m2
7 Pembuatan & pemasangan pintu/jendela jalusi kayu kelas I atau II (Jati) m2
Pembuatan & pemasangan pintu plywood rangkap rangka kayu kelas II (Kamfer) (Tertutup
8 m2
lebar sampai 90 cm)
9 Pembuatan & pemasangan pintu plywood rangka ekspose kayu kelas I atau II (Jati) m2
10 Pembuatan & pemasangan jalusi kusen kayu kelas I atau II (Jati) m2
11 Pembuatan & pemasangan pintu teakwood rangka ekspose kayu kelas I (Jati) m2
12 Pembuatan & Pemasangan pintu lapis formika rangka ekspose kayu kelas II (Kamfer) m2
13 Pemasangan kuda-kuda konvensional kayu kelas I,II,III bentang 6 m (Bangkirai) m3
14 Pemasangan kuda-kuda ekpose kayu kelas I (jati) m3
15 Pemasangan konstruksi gordeng kayu kelas II (Kruing) m3
16 Pemasangan rangka atap genteng keramik kayu kelas II (Kruing) m2
17 Pemasangan rangka atap genteng beton kayu kelas II (Kruing) m2
18 Pemasangan rangka atap sirap kayu kelas II (kruing) m2
19 Pemasangan rangka langit-langit 50x100 kayu kelas II & III (Kruing) m2
20 Pemasangan rangka langit-langit 60x60 kayu kelas II atau III (Kruing) m2

31
KODE URAIAN PEKERJAAN SATUAN

21 Pemasangan listplank 3x20 kayu kelas I dan II (Kamfer) m2


22 Pemasangan listplank 3/30 kayu kelas I dan II (Kamfer) m2
23 Pemasangan rangka dinding pemisah (60x120) cm kayu kelas II atau III (Kruing) m2
24 Pemasangan dinding pemisah teakwood double kayu kelas II (Kruing) m2
25 Pemasangan dinding pemisah plywood rangkap kayu kelas II (Kruing) m2

32
KODE URAIAN PEKERJAAN SATUAN

26 Pemasangan dinding lambrisering kayu kelas I (Jati) m2


27 Pemasangan dinding lambrisering dari plywood (120x240) cm m2
28 Pemasangan dinding bilik rangka kayu kelas III atau IV (Meranti) m2
A.4.6.2. Pekerjaan Kunci & kaca
2 Pemasangan 1 buah kunci tanam biasa bh
3 Pemasangan 1 buah kunci tanam Kamar Mandi bh
4 Pemasangan 1 buah kunci tanam silinder bh
5 Pemasangan 1 buah engsel pintu bh
6 Pemasangan 1 buah engsel jendela kupu-kupu bh
7 Pemasangan 1 buah engsel angin bh
9 Pemasangan 1 buah kait angin bh
10 Pemasangan 1 buah doorcloser bh
11 Pemasangan 1 buah slot bh
12 Pemasangan 1 buah doorholder bh
13 Pemasangan 1 buah doorstop bh
14 Pemasangan 1 buah rel pintu dorong bh
15 Pemasangan 1 buah kunci lemari bh
17 Pemasangan 1 m2 kaca polos tebal 5 mm m2
18 Pemasangan 1 m2 kaca polos tebal 8 mm m2
19 Pemasangan 1 m2 kaca polos tebal 5 mm m2
20 Pemasangan 1 m2 kaca cermin tebal 5 mm m2
23 Pemasangan 1 m2 kaca patri tebal 7 mm m2
A.4.7.1. Pekerjaan Pengecatan
1 Pengikisan/pengerokan 1 m2 permukaan cat tembok lama m2
2 Pencucian 1 m2 permukaan dinding lama m2
3 Pengerokan 1 m2 karat atau cat lama permukaan baja m2
4 Pengecatan bidang kayu baru 1 lapis cat dasar 2 lapis penutup m2
5 Pengecatan bidang kayu baru, 1 lapis cata dasar, 3 lapis penutup m2
6 Pelaburan bidang kayu dgn teak oil m2
7 Pelaburan 1 m2 bidang kayu dengan politur m2
8 Pelaburan 1 m2 bidang kayu dengan residu atau ter m2
10 Pengecatan 1 m2 tembok baru tanpa plamir m2
11 Pengecatan tembok lama m2
15 Pemasangan wall paper m2
16 Pengecatan 1 m2 permukaan baja dengan Menie m2
17 Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah m2
18 Pengecatan 1 m2 permukaan baja galvani cara manual 4 lapis m2
19 Pengecatan 1 m2 permukaan baja galvani cara manual 1 lapis m2
20 Pengecatan 1 m2 permukaan baja galvani cara manual 3 lapis m2
21 Pengecatan 1 m2 permukaan baja galvani semprot 3 lapis m2
A.5.1.1. Pekerjaan Sanitasi Gedung
1 Pemasangan closet duduk/monoblock bh
2 Pemasangan closet jongkok porslen bh
3 Pemasangan urinoir bh
4 Pemasangan wastafel bh
5 Pemasangan bak mandi fiberglass vol 1 m3 bh
6 Pemasangan bak mandi pas. batu bata vol 0.3 m3 bh
7 Pemasangan
Pemasangan bak
floorcuci piring stainlessteel
drain bh
8 bh
9 Pemasangan bak kontrol pasangan bata 30 x 30 tinggi 35 cm bh
10 Pemasangan bak kontrol pasangan bata 45cm x45cm tinggi 50 cm bh
11 Pemasangan bak kontrol pasangan bata 60cm x60cm tinggi 65 cm bh
12 Pemasangan pipa galvanis diameter ½” m1
13 Pemasangan kran diameter ½” atau 3/4” bh
14 Pemasangan pipa galvanis diameter 3/4” m1
15 Pemasangan pipa galvanis diameter 1” m1
16 Pemasangan
Pemasangan pipa
pipa galvanis
PVC tipe diameter 1 ½”1/2”
AW diameter m1
17 m1

33
KODE URAIAN PEKERJAAN SATUAN

18 Pemasangan pipa
Pemasangan PVC tipe
pipa PVC AW diameter
tipe AW 3/4”
diameter 1” m1
19 Pemasangan pipa PVC tipe AW diameter 1 1/2” m1
20 m1
21 Pemasangan pipa PVC tipe AW diameter 2” m1
22 Pemasangan pipa PVC tipe AW diameter 2 1/2” m1
23 Pemasangan pipa PVC tipe AW diameter 3” m1
24 Pemasangan pipa PVC tipe AW diameter 4” m1

34
KODE URAIAN PEKERJAAN SATUAN

O PEKERJAAN KANSTEEN DAN PASANGAN BUIS BETON :


1 1 m' Pasangan kansteen batu bata 1 : 2 m1
2 1 m' Kansteen batu bata 1 : 4 m1
3 1 m' Pasang Got U - 20 m1
4 1 m' Pasang Got U - 30 m1
5 1 m' Pasang Buis beton Ø 20 cm dengan Rolag Bata 1 : 4 (Rolag penuh) m1
6 1 m' Pasang Buis beton Ø 30 cm dengan Rolag Bata 1 : 4 (Rolag penuh) m1
7 1 m' Pasang Buis beton Ø 40 cm dengan Rolag Bata 1 : 4 (Rolag penuh) m1
8 1 m' Pasang Buis beton Ø 50 cm dengan Rolag Bata 1 : 4 (Rolag penuh) m1
9 1 m' Pasang Buis beton Ø 60 cm dengan Rolag Bata 1 : 4 (Rolag penuh) m1
10 1 m' Pasang Buis beton Ø 80 cm dengan Rolag Bata 1 : 4 (Rolag penuh) m1
11 1 m' Pasang Buis beton Ø 20 cm dengan Cincin bata 1 : 4 m1
12 1 m' Pasang Buis beton Ø 30 cm dengan Cincin bata 1 : 4 m1
13 1 m' Pasang Buis beton Ø 40 cm dengan Cincin bata 1 : 4 m1
14 1 m' Pasang Buis beton Ø 50 cm dengan Cincin bata 1 : 4 m1
15 1 m' Pasang Buis beton Ø 60 cm dengan Cincin bata 1 : 4 m1
16 1 m' Pasang Buis beton U 20 cm lengkap dengan Cincin bata 1 : 4 m1
17 1 m' Pasang Buis beton U 30 cm lengkap dengan Cincin bata 1 : 4 m1
18 1 m2 Pasang paving kawung lokal tebal 6 cm m2
19 1 m2 Pasang paving kawung lokal tebal 8 cm m2
20 1 m2 Pasang paving kawung tebal 6 cm SNI m2
21 1 m2 Pasang
D.01. KistdamPaving kawung tebal 8 cm SNI
pasir/tanah m2
PEKERJAAN SUMBER DAYA AIR

a). Kistdam pasir/tanah dibungkus plastik bagor (sebesar karung beras 25 kg) uk. 43 cm x 65
1 bh
cm (1 buah)
P.06 Pasangan Batu Bronjong Kawat

(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi
1
3,40 mm dan kawat pengikat 2,0 mm, ukuran lubang heksagonal 80 x 100 mm;

(b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0
2
mm dan kawat pengikat 2,0 mm, ukuran lubang heksagonal 100 x 120 mm;

P.07 Cerucuk
1 a). 1 m panjang cerucuk kayu/dolken diameter 8cm - 10cm m
2 b). 1 m panjang cerucuk bambu diameter 8cm - 10cm m
P.08 Pasang batu muka dan batu candi
1 a). Pasangan batu muka (1 m2) m2
2 b). Pasangan batu candi (1 m2) m2
P. 09. Pasangan Geotekstil
1 a) Pemasangan geotekstil (1 m2) m2

2 B.21. 1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm (tanpa perancah) m2

B.21. 1 m2 bekisting untuk permukaan beton biasa dengan papan ukuran 3/20 cm (tanpa
3 m2
perancah)

35
A SATUAN POKOK KEGIATAN (HSPK)
KONSTRUKSI DIKONTRAKAN (TANPA PPN)
INTAH KOTA SURAKARTA TAHUN 2018
UK PEKERJAAN TANPA ALAT BERAT

HARGA
Rp

735,610.70
125,277.90
9,845.00
247,596.80
844,054.20
422,027.10

46,502.50
56,974.50
67,602.70
61,899.20
93,786.00
74,794.50
3,360.50
20,383.00
33,605.00
33,605.00
216,601.00
299,321.00
62,881.50
214,802.50

840,180.00
797,940.00
768,636.00
748,044.00
719,796.00
585,974.40
699,567.00
676,599.00
442,332.00

2,662,632.50

795,485.90

846,470.85
879,447.28
905,168.54
799,264.71
935,686.29
964,732.94
986,715.41
1,001,004.53
1,025,723.10
1,034,223.63
1,096,726.84
1,106,748.32
159,612.20
148,352.60
171,006.00
184,756.00

36
HARGA
Rp
359,293.00
378,103.00
416,493.00
377,443.00

37
HARGA
Rp
331,298.00
252,860.30
4,188,874.80
5,212,141.00
8,976,627.00
6,925,649.50
6,158,146.50
6,074,318.80
6,384,301.00
82,934.50
100,576.30

26,066.70
26,066.70
71,636.40
838,317.70
47,025.00
487,605.80
723,195.00
109,660.98
544,120.17
471,455.60
188,532.30
465,628.63
138,266.89
176,716.10
206,993.60
85,896.80

222,844.05

277,632.30

248,061.00
237,039.00
229,119.00
225,753.00
226,149.00
215,414.10
119,806.50
114,288.90
111,292.50
109,418.10
108,678.90
106,540.50
108,355.50
95,135.70
96,526.10
215,763.90
218,100.30
446,770.50
446,770.50
981,948.00

55,709.28
49,795.68
47,356.32
45,592.80
44,726.88

38
HARGA
Rp
43,977.12
43,607.52
43,237.92
44,338.80
43,137.60

39
HARGA
Rp
39,293.10
39,876.10
66,638.44
54,367.06
60,946.60
59,880.04
58,792.36
54,752.50
29,293.88
41,232.40
34,296.90
19,689.56
9,427.00
42,556.80
24,970.00

150,893.05
141,053.00
192,577.00
183,491.00
362,483.00
398,224.75
349,355.60
397,782.00
62,827.60
54,212.40
41,567.90
57,561.90
75,090.40
291,915.80
243,680.80
162,910.00
165,748.00
389,521.00
33,058.30
79,208.80
46,591.60
656,814.40
181,694.70
366,850.00
165,143.00
1,318,438.00
1,903,748.00
306,933.00
200,596.00
728,797.30
220,745.80
230,230.00
209,055.00
344,556.30
162,816.50
42,719.60
51,085.65

32,292.70
282,638.40
178,138.40
78,424.50

40
HARGA
Rp
36,176.25
347,787.00
42,295.00
197,257.50
17,949.80

41
HARGA
Rp

98,214.05
153,252.00
75,152.00
100,652.20
106,152.20
96,802.20
88,079.20
101,829.20
101,301.20
121,926.20
66,926.20
76,551.20
79,301.20
88,926.20
128,801.20
69,676.20
71,051.20
82,051.20
86,176.20
97,176.20
282,278.70
248,618.70
245,428.70
213,638.70
213,638.70
213,638.70
208,209.10
205,388.70
136,510.00
352,166.10
104,782.70
154,154.00
83,773.80
47,686.10
42,625.00
28,730.90

29,449,475.00
13,926,000.00
560,651.30
391,405.30
1,424,225.00
527,230.00
2,084,225.00
582,587.50
1,035,667.60
1,883,591.38
1,013,760.00
678,697.80
16,197,577.00
32,094,859.50
10,694,667.50
467,109.50
696,129.50
124,821.84
160,154.50
165,825.00

42
HARGA
Rp
132,808.50
133,864.50
261,968.30
336,682.50
353,454.20

43
HARGA
Rp
383,152.00
36,468.30
134,771.89

130,179.50
115,426.30
201,226.30
35,311.98
36,372.05
44,457.05
31,474.30
429,399.30
210,244.10
181,899.30
77,423.50
311,732.30
44,184.03
156,586.98
359,661.39
233,659.03
310,324.30
3,348,750.90

10,519.30
9,804.30
10,194.80
43,589.70
56,116.50
27,013.80
56,063.70
12,183.60
19,894.27
13,304.28
88,921.25
22,559.35
38,891.60
49,883.13
27,293.20
109,803.10
96,525.00

3,157,495.00
705,002.89
2,728,055.00
1,533,741.00
917,785.00
1,251,063.00
362,510.50
53,003.50
354,473.90
535,793.50
685,748.25
39,263.40
110,308.00
47,282.40
57,974.40
84,322.70
17,129.75

44
HARGA
Rp
19,891.85
24,569.60
40,774.80
49,194.75
69,409.45
91,729.00
141,446.80

45
HARGA
Rp

91,538.31
43,246.25
64,561.05
70,061.05
294,292.83
354,648.25
414,003.66
481,948.80
558,609.16
701,292.23
166,196.20
196,498.46
232,684.14
278,848.55
321,159.91
129,106.33
136,556.55
136,910.40
167,055.90
168,326.40
220,647.90

37,118.40

783,846.80

796,723.40

19,154.30
15,041.40

135,203.20
197,353.20

54,373.00

84,620.36

98,741.50

46
I. UPAH PEKERJA

HARGA
NO. JENIS PEKERJA KODE SATUAN
Rp

1 Pekerja L. 01 Hr 54,000.00
2 Tukang gali L. 02 Hr 58,000.00
3 Tukang batu L. 02 Hr 66,000.00
4 Tukang kayu L. 02 Hr 68,000.00
5 Tukang besi L. 02 Hr 68,000.00
6 Tukang cat L. 02 Hr 66,000.00
7 Tukang pipa L. 02 Hr 64,000.00
8 Tukang las L. 02 Hr 66,000.00
9 Tukang penganyam L. 02 Hr 64,000.00
10 Kepala Tukang L. 03 Hr 69,000.00
11 Mandor L. 04 Hr 71,000.00
12 Mekanik L. 07 Hr 66,000.00
13 Operator Alat Berat L. 08 Hr 66,000.00
14 Pembantu Operator L. 09 Hr 64,000.00
15 Supir L. 10 Hr 66,000.00
16 Penjaga Malam L. 12 Hr 55,000.00

7
II BAHAN

NO. JENIS BAHAN SATUAN


I BAHAN TAMBANG
1 Batu Kali
Batu Belah m3
Pecah 15/20 m3
Pecah 10/15 m3
Pecah 5/7 m3
Pecah 3/5 m3
2 Kerikil
Koral m3
Beton 0,5/1 m3
Beton 1/2 m3
Beton 2/3 m3
3 Pasir
Urug m3
Pasang m3
Beton m3
4 Portland Cement
Semen Abu-abu 40 kg zak
Semen Putih 40 kg zak
Semen Warna kg
5 Tanah
Padas m3
Liat m3
6 Kapur
Pasang m3
7 Batu Bata
ex lokal bh
8 Sirtu m3

II BAHAN PENUTUP ATAP


1 Genteng Tanah Liat
Genteng Morando Jatiwangi bh
Genteng Kerpus Jatiwangi bh
Genteng Pres Ex. Mojolaban bh
Genteng Kerpus Ex. Mojolaban bh
Genteng Morando Kebumen bh
Genteng Magas Kebumen bh
Genteng Kerpus Kebumen bh
Genteng Kodok bh
Genteng Kodok Glazuur bh
Kerpus Kodok bh
Kerpus Kodok Glazuur bh
Genteng Metal ex Rainbow (Stone) m2
Harflex Motif Sirap lbr
Nok Genteng Metal (NAS) bh
2 Genteng Beton
Genteng Beton Warna standard bh
Genteng Beton Warna Special bh
Kerpus Beton Warna Standard bh
Kerpus Beton Warna Special bh
3 Asbes Gelombang Besar
200 cm X 102 cm X 5 mm bh
225 cm X 102 cm X 5 mm bh
250 cm X 102 cm X 5 mm bh
4 Asbes Gelombang Kecil
150 cm X 105 cm X 4 mm bh
NO. JENIS BAHAN SATUAN
180 cm X 105 cm X 4 mm bh
210 cm X 105 cm X 4 mm bh
240 cm X 105 cm X 4 mm bh
270 cm X 105 cm X 4 mm bh
300 cm X 105 cm X 4 mm bh

5 Nok
Jabes Nok
Stel Besar bh
Paten Besar bh
Nokstell Gelombang Harflex
NO. JENIS BAHAN SATUAN
Stel Besar bh
Paten Besar bh
6 Fiber Glass (Jabes)
180 X 92 cm bh
200 X 92 cm bh
250 X 92 cm bh
180 X 105 cm bh
210 X 105 cm bh
250 X 105 cm bh
7 Seng Plat
Seng Talang BJLS 30 lebar 60 cm m'
Seng Talang BJLS 30 lebar 90 cm m'
8 Seng Gelombang
Seng Gelombang (180 x 90) tbl. 0,2 lbr
Seng Gelombang (240 x 90) tbl. 0,2 lbr
9 Sirap (100 lbr)
(100 lbr) pak

III . B A H A N K A Y U
1 Jati
Papan m3
Balok m3
Reng Jati m3
2 Kamper
Papan m3
Balok m3
3 Kruing
Papan m3
Balok m3
4 Meranti
Papan m3
Balok m3
5 Bengkirai
Papan m3
Balok m3
6 Sengon m3

7 Bilik Bambu m2
8 Kayu Perancah m3
9 Dolken bt
10 Bambu bt

IV . BAHAN PENUTUP DINDING/LANTAI


1 Ubin (Tegel Biasa)
PC polos m2
30 X 30 cm
20 X 20 cm m2
PC warna m2
30 X 30 cm
20 X 20 cm m2
2 Tegel Plint PC warna 10 x 30 cm bh
3 Tegel Plint PC warna 10 x 20 cm bh
4 Tegel Plint PC abu-abu
10 x 20 cm bh
10 x 30 cm bh
5 Keramik
30 X 30 cm (Ex. Asia) m2
40 X 40 cm (Ex. Asia) m2
NO. JENIS BAHAN SATUAN

25 x 25 cm (Ex. Asia) m2
20 x 25 cm (Ex. Asia) m2
6 Keramik
30 X 30 cm (Ex. Roman) m2
40 X 40 cm (Ex. Roman) m2
20 x 20 cm (Ex. Roman) m2
20 x 25 cm (Ex. Roman) m2
7 Keramik 33 x 33 cm (Ex. Roman) m2
8 Keramik 10 x 33 cm bh
9 Keramik 10 x 20 cm bh
NO. JENIS BAHAN SATUAN
10 Keramik 10 x 10 cm bh
11 Keramik 5 x 20 cm bh
12 Keramik Artistik 10 cm x 20 cm bh
13 Keramik Artistik 5 cm x 20 cm bh
14 Ubin Teralux 40 x 40 cm bh
15 Ubin Teralux 30 x 30 cm bh
16 Ubin Teralux Marmer 60 x 60 cm bh
17 Ubin Teralux Marmer 40 x 40 cm bh
18 Ubin Teralux Marmer 30 x 30 cm bh
19 Porselen 11 x 11 cm bh
20 Tegel Plint PC Warna 10 x 40 cm bh
21 Parquet Jati m2
22 Batu Paras m2
23 Batu Candi m2
24 Batu Andesit m2
25 Batu Tempel Hitam m2
26 Granito
40 x 40 cm m2
30 x 30 cm m2
27 Marmer m2
28 Wallpaper m2
29 Marmer 100 x 100 cm bh
30 Karpet m2
31 Porselen 11 x 11cm bh
32 Plint Vynil 15 cm x 30 cm bh
33 Lantai Vynil Ukuran 30 cm x 30 cm bh
34 Sunscreen Alluminium m2
35 Ubin Teralux Marmer 100 x 100 cm bh

V.BAHAN CETAK
1 Buis Beton
Ø 20 cm - 100 cm bh
Ø 30 cm - 100 cm bh
Ø 40 cm - 100 cm bh
Ø 50 cm - 100 cm bh
Ø 60 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh
U 20 cm - 100 cm bh
U 30 cm - 100 cm bh
2 HB-10 bh
3 Lubang Angin (Roster)
Roster Beton bh

VI . B A H A N BESI
1 Besi Beton kg
2 Besi Plat (Besi Strip) kg
3 Besi Profil (Besi Profil) kg
4 Kawat
- Kawat Beton/Bendrat kg
- Kawat Harmonika m2
- Kawat Nyamuk Nylon m2
- Kawat Kasa m2
- Saringan Pasir m2
- Kawat Duri rol
- Kawat Bronjong kg
- Kawat Las Listrik kg
5 Hollow Galvanis
- Hollow Galvanis 4/4 cm tebal 0,65 mm btg
NO. JENIS BAHAN SATUAN
- Hollow Galvanis 2/4 cm tebal 0,65 mm btg
- Hollow GT 2/4 tebal 0,4 mm btg
- Hollow GT 4/4 tebal 0,4 mm btg
6 Pagar BRC
- Pagar BRC HD 60 (60 x 240) lbr
- Pagar BRC HD 90 (90 x 240) lbr
- Pagar BRC HD 120 (120 x 240) lbr
- Pagar BRC HD 150 (150 x 240) lbr
- Pagar BRC HD 175 (175 x 240) lbr
- Pagar BRC HD 190 (190 x 240) lbr
7 Folding Gate (Delux P Tb : 0,8 mm) m2
NO. JENIS BAHAN SATUAN

8 Pintu Lipat Besi m2


9 Kusen Aluminium Colkat m'
10 Kusen Aluminium Silver m'
11 Rolling Door Aluminium m2
12 Profil Allum"T" m
13 Kawat dia 4 mm kg
14 Ramset bh
15 Alumunium Strip m
16 Profil Kaca m
17 Vertical Blinds m2

VII . B A H A N P I P A
1 Pipa PVC
Pipa PVC Ǿ ½" / 4m btg
Pipa PVC Ǿ ¾" / 4m btg
Pipa PVC Ǿ 1" / 4m btg
Pipa PVC Ǿ 1½" / 4m btg
Pipa PVC Ǿ 2" / 4m btg
Pipa PVC Ǿ 3"/ 4m btg
Pipa PVC Ǿ 4" / 4m btg
Pipa PVC Ǿ 2 1/2" / 4m btg
2 Pipa Medium B Galvanis
Pipa Medium B Galvanis ½" btg
Pipa Medium B Galvanis ¾" btg
Pipa Medium B Galvanis 1" btg
Pipa Medium B Galvanis 1½" btg
Pipa Medium B Galvanis 2" btg
Pipa Medium B Galvanis 2½" btg

VIII . B A H A N L A N G I T - L A N G I T
1 Akustik
30 X 30 cm lbr
30 X 60 cm lbr
60 X 120 cm lbr
2 List Kayu Profil m'
3 Soft Board 4" x 8"
4 Gypsum tebal 9 mm lbr
5 Hard Board 4" x 8" lbr
6 Formika lb
7 Ply Wood
8 Teak Wood
90 X 210 (3 mm) lbr
120 X 240 (3 mm) lbr
9 Tripleks lbr
120 X 240 (3 mm) lbr
120 X 240 (4 mm) lbr
120 X 240 (6 mm) lbr
10 Multipleks
120 X 240 (9 mm) lbr
120 X 240 (12 mm) lbr
120 X 240 (15 mm) lbr
120 X 240 (18 mm) lbr
11 Woodplank (4 m) lbr
12
15 Eternit (1m
List Kayu 2/4x 1m) lbr1
m
13 Kalsiboard 6 mm lbr
14 GRC 6 mm lbr

IX . B A H A N F I N I S H I N G
1 Kayu
Menie kg
Dempul plamur kg
NO. JENIS BAHAN SATUAN
Ambril/amplas lbr
Cat dasar kg
Emco kg
Kuas bh
Envilux ltr
Wood Filler kg
Wood Stain ltr
Spiritus ltr
NO. JENIS BAHAN SATUAN
2 Tembok
Plamur kg
Cat Tembok (dalam) Ex. Catylac 5 kg
Cat Tembok (luar) Ex. Mowilex 2,5 kg

3 Besi
Menie kg
Cat mengkilat kg
Cat kg
Thinner B ltr
Thinner Super ltr
4 Cat Genteng 2,5 ltr

X.BAHAN KACA
1 Bening 3 mm m2
2 Bening 5 mm m2
3 Bening 8 mm m2
4 Es Kabur 3 mm m2
5 Es Kabur 5 mm m2
6 Ray Band 5 mm m2
7 Cermin 3 mm m2
8 Cermin 5 mm m2
9 Naco per Daun bh
10 Kaca Patri 7 mm (Timah) m2
11 Kaca Patri 7 mm (Kuningan) m2
12 Kaca Buram 5 mm m2
Kaca Cermin 5 mm m2
XI . BAHAN INSTALASI LISTRIK
1 Kabel Listrik
N Y A (1 x 1 1/2 mm) m'
N Y A (1 x 2 1/2 mm) m'
N Y A (1 x 4 mm) m'
N Y Y (2 x 1 1/2 mm) m'
N Y Y (2 x 2 1/2 mm) m'
N Y Y (3 x 1 1/2 mm) m'
N Y Y (3 x 2 1/2 mm) m'
N Y Y (3 x 4 mm) m'
N Y M (2 x 1 1/2 mm) m'
N Y M (2 x 2 1/2 mm) m'
N Y M (3 x 4 mm) m'

2 Sakelar
In bauw Seri bh
In bauw Engkel bh

3 Fuse Box (Sekering Biasa)


1 group bh
2 group bh
3 group bh

4 Steker
Biasa bh
Arde bh
T Biasa bh
T dengan Arde bh

5 Fitting
Kap bh
Kombinasi bh
NO. JENIS BAHAN SATUAN

6 Stop Kontak
Stop Kontak In Bow bh
Stop Kontak AC bh
NO. JENIS BAHAN SATUAN
XII . ALAT - ALAT PENGUNCI & PENGGANTUNG
1 Kunci Tanam
Union 1 x slag bh
Union 2 x slag bh
Yale 1 x slag bh
Yale 2 x slag bh
Kuda 1 x slag bh
Kuda 2 x slag bh
2 Kunci Slot bh
3 Rel Pintu set
4 Kunci Tanam Antik bh
5 Kunci Lemari bh
6 Kunci Silinder bh
7 Engsel dan Grendel
Engsel Angin bh
Kupu-kupu biasa bh
Nylon kupu-kupu bh
Espagnoled lokal bh
Grendel biasa bh
Kait Angin bh
8 Door Stop bh
9 Door closer bh

XIII . BAHAN SANITAIR


1 Kloset Duduk bh
2 Kloset Jongkok bh
3 Wastafel bh
4 Wasbak 1 Lubang bh
5 Tempat Sabun Tanam bh
6 Kran Air bh
7 Tangki Air Merk Penguin 500 ltr
8 Tangki Air Merk Penguin 1000 ltr
9 Floor Drain bh
10 Seal Tafe bh
11 Urinoir bh
12 Bak fibreglass bh
13 Water Drain bh
14 Door Holder bh

XIV . ALAT PENGIKAT KAYU


1 Paku Usuk kg
2 Paku - reng kg
3 Paku - triplek kg
4 Paku - payung kg
5 Paku - sekrup kg
6 Paku 12 cm bh
7 Paku Skrup bh
8 Skrup Fixer bh
9 Paku - beton kg
10 Mur Baut (kuda-kuda) kg
11 Angkur Baut bh
12 Lem Kayu kg
13 Tali Ijuk kg

XV . POMPA AIR.
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh
2 POMPA AIR LISTRIK
Sanyo . 125 watt bh
Shimizu . 125 watt bh
Dab . 125 watt bh
NO. JENIS BAHAN SATUAN
NO. JENIS BAHAN SATUAN

X VI . PAVING BLOCK
1 Paving tebal 8 cm (lokal) m2
2 Paving tebal 6 cm (lokal) m2
3 Paving tebal 6 cm K. 250 (abu-abu) m2
4 Paving tebal 6 cm K. 250 (merah) m2
5 Paving tebal 6 cm K. 250 (biru) m2
6 Paving tebal 6 cm K. 250 (hijau) m3
7 Paving tebal 6 cm K. 250 (kuning) m2
8 Paving tebal 8 cm K. 300 (abu-abu) m2
9 Paving tebal 8 cm K. 300 (merah) m2
10 Paving tebal 8 cm K. 300 (kuning) m2
11 Paving tebal 8 cm K. 300 (hijau) m2
12 Paving tebal 8 cm K. 300 (biru) m2
13 Kanstin (A1/40) bj
14 Kanstin (B2,B6/50 cm) bj
15 Kanstin (K3) bj
16 Kanstin (K5) bj
17 Raam (65 cm) bj
18 Raam (30 cm) bj
19 Paving Difabel bj
20 Grass Block m2

XVII. L A I N - L A I N
1 Minyak Beton & bekisting ltr
2 Air ltr
3 Minyak pelumas ltr
4 Lem kayu kg
5 Soda Api kg
6 Sabun kg
7 Residu atau Ter lt
8 Sealant tube
9 Sewa Alat jam
HARGA

220,000.00
220,000.00
225,000.00
230,000.00
235,000.00

180,000.00
270,000.00
260,000.00
250,000.00

150,000.00
240,000.00
250,000.00

48,000.00
90,000.00
14,000.00

65,000.00
65,000.00

270,000.00

750.00
150,000.00

`
4,500.00
8,500.00
2,000.00
5,500.00
4,500.00
3,000.00
7,500.00
2,500.00
5,000.00
7,500.00
8,500.00
229,500.00
38,000.00
45,000.00

9,500.00
10,300.00
19,000.00
22,000.00

87,500.00
100,000.00
125,000.00

52,000.00
HARGA
58,500.00
68,000.00
77,500.00
88,000.00
96,500.00

58,000.00
75,000.00
HARGA
45,000.00
35,000.00

81,000.00
85,000.00
92,000.00
90,000.00
94,300.00
107,000.00

38,500.00
42,000.00

48,800.00
65,300.00

210,000.00

25,000,000.00
22,500,000.00
8,625,000.00

10,250,000.00
9,100,000.00

7,600,000.00
6,900,000.00

6,400,000.00
5,700,000.00

14,000,000.00
12,100,000.00
2,500,000.00

22,000.00
2,250,000.00
25,000.00
13,000.00

85,000.00

75,000.00
100,000.00

90,000.00
10,500.00
8,500.00

8,000.00
10,000.00

50,000.00
59,000.00
HARGA

52,000.00
55,000.00

120,000.00
125,000.00
105,000.00
95,000.00
122,000.00
5,200.00
2,650.00
HARGA
5,250.00
5,200.00
20,000.00
15,000.00
-
-
95,400.00
38,200.00
20,200.00
500.00
20,000.00
240,000.00
110,000.00
120,000.00
185,000.00
92,500.00

250,000.00
275,000.00
475,000.00
50,000.00
480,000.00
127,500.00
500.00
15,000.00
24,000.00
325,000.00
95,400.00

65,000.00
72,000.00
80,000.00
97,000.00
109,000.00
115,000.00
160,000.00
55,000.00
60,000.00
5,000.00

12,000.00

12,650.00
12,650.00
13,800.00

19,800.00
40,000.00
35,000.00
37,500.00
18,000.00
175,000.00
20,000.00
65,000.00

39,000.00
HARGA
32,000.00
25,000.00
29,000.00

195,000.00
220,000.00
260,000.00
378,000.00
450,000.00
495,000.00
1,750,000.00
HARGA

385,000.00
80,000.00
72,000.00
525,000.00
8,500.00
16,000.00
22,000.00
9,000.00
10,000.00
125,000.00

22,500.00
28,700.00
39,200.00
67,600.00
86,500.00
170,100.00
281,700.00
120,000.00

90,000.00
117,000.00
153,000.00
212,400.00
260,000.00
310,000.00

20,000.00
25,000.00
38,000.00
9,000.00

75,000.00
65,000.00
75,000.00

95,700.00
125,000.00

50,700.00
62,700.00
81,200.00

125,000.00
174,200.00
218,600.00
241,700.00
79,000.00
20,000.00
4,500.00
130,000.00
165,000.00

32,500.00
32,500.00
HARGA
4,500.00
36,000.00
59,000.00
17,100.00
62,000.00
38,000.00
77,500.00
15,000.00
HARGA

27,000.00
155,000.00
250,000.00

45,000.00
54,000.00
52,000.00
20,000.00
24,000.00
185,000.00

82,000.00
115,000.00
280,000.00
120,000.00
170,000.00
130,000.00
150,000.00
245,000.00
37,500.00
2,750,000.00
3,750,000.00
160,000.00

4,000.00
5,000.00
7,500.00
8,600.00
15,000.00
13,000.00
20,000.00
35,000.00
8,000.00
12,500.00
31,000.00

23,500.00
15,000.00

120,000.00
230,000.00
330,000.00

12,000.00
15,000.00
14,000.00
22,500.00

15,000.00
21,000.00
HARGA

17,500.00
72,000.00
HARGA

52,000.00
67,000.00
80,000.00
135,000.00
50,000.00
60,000.00
175,000.00
235,000.00
160,000.00
20,000.00
145,000.00

20,000.00
25,000.00
27,500.00
50,000.00
12,000.00
16,000.00
62,000.00
350,000.00

2,460,000.00
459,000.00
900,000.00
250,000.00
35,000.00
70,000.00
1,100,000.00
1,750,000.00
40,000.00
9,000.00
1,800,000.00
275,000.00
55,000.00
125,000.00

17,200.00
20,000.00
21,000.00
31,600.00
15,000.00
500.00
500.00
750.00
20,000.00
15,000.00
14,000.00
25,000.00
8,000.00

320,000.00

575,000.00
450,000.00
520,000.00
HARGA
HARGA

98,500.00
72,400.00
99,600.00
121,000.00
213,500.00
170,000.00
149,500.00
144,900.00
166,000.00
196,900.00
223,300.00
297,500.00
92,600.00
45,600.00
51,100.00
46,500.00
83,300.00
48,800.00
45,900.00
132,000.00

9,000.00
50.00
35,000.00
25,000.00
25,000.00
12,000.00
15,000.00
75,000.00
45,000.00
II BAHAN

SATUAN
NO JENIS BAHAN
I BAHAN TAMBANG
1 Batu Kali
Batu Belah m3
Pecah 15/20 m3
Pecah 10/15 m3
Pecah 5/7 m3
Pecah 3/5 m3
2 Kerikil Koral m3
Beton 0,5/1 m3
Beton 1/2 m3
Beton 2/3 m3
Sirtu m3
4 Pasir Urug m3
Pasang m3
Beton m3
5 Tanah Padas m3
Liat m3
6 Kapur Pasang m3
7 Portland Cement
Semen Abu-abu 40 kg zak
Semen Putih 40 kg zak
Semen Warna kg
3 Batu Bata ex lokal bh

II BAHAN PENUTUP ATAP

1 Sirap (100 lbr) (100 lbr) pak

2 Genteng Beton Genteng Beton Warna standard bh


Genteng Beton Warna Special bh
Kerpus Beton Warna Standard bh
Kerpus Beton Warna Special bh
3 Genteng Tanah Liat
Genteng Morando Jatiwangi bh
Genteng Kerpus Jatiwangi bh
Genteng Pres Ex. Mojolaban bh
Genteng Kerpus Ex. Mojolaban bh
Genteng Morando Kebumen bh
Genteng Magas Kebumen bh
Genteng Kerpus Kebumen bh
4 Asbes Gelombang Besar
200 cm X 102 cm X 5 mm bh
225 cm X 102 cm X 5 mm bh
250 cm X 102 cm X 5 mm bh
Asbes Gelombang Kecil
150 cm X 105 cm X 4 mm bh
180 cm X 105 cm X 4 mm bh
210 cm X 105 cm X 4 mm bh
240 cm X 105 cm X 4 mm bh
270 cm X 105 cm X 4 mm bh
300 cm X 105 cm X 4 mm bh
Nok Jabes Nok
Stel Besar bh
Paten Besar bh
Nokstell Gelombang Harflex
Stel Besar bh
Paten Besar bh

5 Fiber Glass (Jabes)


180 X 92 cm bh
200 X 92 cm bh
250 X 92 cm bh
180 X 105 cm bh
210 X 105 cm bh
250 X 105 cm bh
6 Seng Plat
Seng Talang BJLS 30 lebar 60 cm m'
Seng Talang BJLS 30 lebar 90 cm m'
7 Seng Gelombang
Seng Gelombang (180 x 90) tbl. 0,2 lbr
Seng Gelombang (240 x 90) tbl. 0,2 lbr

III BAHAN KAYU


1 Jati Papan m3
Balok m3
2 Kamper Papan m3
Balok m3
3 Kruing Papan m3
Balok m3
4 Meranti Papan m3
Balok m3
5 Bengkirai Papan m3
Balok m3
6 Sengon m3

7 Dolken bt
8 Bambu bt

IV BAHAN PENUTUP DINDING/LANTAI


1 Ubin (Tegel Biasa)
PC polos 30 X 30 cm m2
20 X 20 cm m2
PC warna 30 X 30 cm m2
20 X 20 cm m2
2 Tegel Plint PC warna 10 x 30 cm 10 X 30 cm bh
Tegel Plint PC warna 10 x 20 cm 10 X 20 cm bh
Tegel Plint PC abu-abu 10 x 20 cm bh
10 x 30 cm bh
3 Keramik 30 X 30 cm (Ex. Asia) m2
40 X 40 cm (Ex. Asia) m2
25 x 25 cm (Ex. Asia) m2
20 x 25 cm (Ex. Asia) m2
Tegel Plint PC Warna 10 x 40 cm 10 X 40 cm bh
4 Parquet Jati m2

5 Batu Paras m2

6 Batu Candi m2

7 Batu Andesit m2
Batu Tempel Hitam m2
8 Granito 40 x 40 cm m2
30 x 30 cm m2
9 Marmer m2

V BAHAN CETAK
1 Buis Beton
Ø 20 cm - 100 cm bh
Ø 30 cm - 100 cm bh
Ø 40 cm - 100 cm bh
Ø 50 cm - 100 cm bh
Ø 60 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh
U 20 cm - 100 cm bh
U 30 cm - 100 cm bh

2 Lubang Angin (Roster)


Roster Beton bh

VI BAHAN BESI
1 Besi Beton kg
2 Besi Plat (Besi Strip) Besi Strip kg
3 Besi Profil (Besi Profil) Besi Profil kg
4 Kawat
- Kawat Beton/Bendrat kg
- Kawat Harmonika m2
- Kawat Nyamuk Nylon m2
- Kawat Kasa m2
- Saringan Pasir m2
- Kawat Duri rol
- Kawat Bronjong kg
- Kawat Las Listrik kg
5 Hollow Galvanis
- Hollow Galvanis 4/4 cm tebal 0,65 mm btg
- Hollow Galvanis 2/4 cm tebal 0,65 mm btg
6 Pagar BRC
- Pagar BRC HD 60 (60 x 240) lbr
- Pagar BRC HD 90 (90 x 240) lbr
- Pagar BRC HD 120 (120 x 240) lbr
- Pagar BRC HD 150 (150 x 240) lbr
- Pagar BRC HD 175 (175 x 240) lbr
- Pagar BRC HD 190 (190 x 240) lbr
7 Folding Gate (Delux P Tb : 0,8 mm) m2
8 Pintu Lipat Besi m2
9 Kusen Aluminium Colkat m'
10 Kusen Aluminium Silver m'
11 Rolling Door Aluminium m2

VII BAHAN PIPA


1 Pipa PVC
Pipa PVC Ǿ ½" / 4m btg
Pipa PVC Ǿ ¾" / 4m btg
Pipa PVC Ǿ 1" / 4m btg
Pipa PVC Ǿ 1½" / 4m btg
Pipa PVC Ǿ 2" / 4m btg
Pipa PVC Ǿ 3"/ 4m btg
Pipa PVC Ǿ 4" / 4m btg
Pipa PVC Ǿ 2 1/2" / 4m btg
2 Pipa Medium B Galvanis
Pipa Medium B Galvanis ½" btg
Pipa Medium B Galvanis ¾" btg
Pipa Medium B Galvanis 1" btg
Pipa Medium B Galvanis 1½" btg
Pipa Medium B Galvanis 2" btg
Pipa Medium B Galvanis 2½" btg

VIII B A H A N L A N G I T - L A N G I T
1 AKUSTIK : 30 X 30 cm lbr
30 X 60 cm lbr
60 X 120 cm lbr
2 List Kayu Profil m'
3 Soft Board 4" x 8" 4'X 8'
Gypsum tebal 9 mm lbr
4 Hard Board 4" x 8" 4'X 8' lbr

5 Ply Wood
Teak Wood
90 X 210 (3 mm) X 3 mm lbr
120 X 240 (3 mm) X 3 mm lbr
Tripleks lbr
120 X 240 (3 mm) X 3 mm lbr
120 X 240 (4 mm) X 4 mm lbr
120 X 240 (6 mm) X 6 mm lbr
Multipleks
120 X 240 (9 mm) X 9 mm lbr
120 X 240 (12 mm) X 12 mm lbr
120 X 240 (15 mm) X 15 mm lbr
120 X 240 (18 mm) X 18 mm lbr
6 Woodplank (4 m) lbr
7 Eternit (1m x 1m) lbr

IX BAHAN FINISHING
1 Kayu
Menie kg
Dempul plamur kg
Ambril/amplas lbr
Cat dasar kg
Emco kg
Kuas bh
Envilux ltr
Wood Filler kg
Wood Stain ltr
Spiritus ltr

2 Tembok
Plamur kg
Cat Tembok (dalam) Ex. Catylac 5 kg
Cat Tembok (luar) Ex. Mowilex 2,5 kg

3 Besi
Menie kg
Cat mengkilat kg
Cat kg
Thinner B ltr
Thinner Super ltr

4 Cat Genteng 2,5 ltr

X BAHAN KACA Bening 3 mm m2


1 BENING Bening 5 mm m2
Bening 8 mm m2
2 Es Kabur 5 mm 5 mm m2
3 Ray Band 5 mm 5 mm m2
4 Cermin 5 mm 5 mm m2

XI BAHAN INSTALASI LISTRIK


1 Kabel Listrik
N Y A (1 x 1 1/2 mm) 1 X 1 1/2 mm m'
N Y A (1 x 2 1/2 mm) 1 X 2 1/2 mm m'
N Y A (1 x 4 mm) 1 X 4 mm m'
N Y Y (2 x 1 1/2 mm) 2 X 1 1/2 mm m'
N Y Y (2 x 2 1/2 mm) 2 X 2 1/2 mm m'
N Y Y (3 x 1 1/2 mm) 3 X 1 1/2 mm m'
N Y Y (3 x 2 1/2 mm) 3 X 2 1/2 mm m'
N Y Y (3 x 4 mm) 3 X 4 mm m'
N Y M (2 x 1 1/2 mm) 2 X 1 1/2 mm m'
N Y M (2 x 2 1/2 mm) 2 X 2 1/2 mm m'
N Y M (3 x 4 mm) 3 X 4 mm m'

2 Sakelar
In bauw Seri Seri bh
In bauw Engkel Engkel bh

3 Fuse Box (Sekering Biasa)


1 group bh
2 group bh
3 group bh

4 Steker Biasa bh
Arde bh
T Biasa bh
T dengan Arde bh

5 Fitting Kap bh
Kombinasi bh

6 Stop Kontak
Stop Kontak In Bow bh
Stop Kontak AC bh

XII ALAT - ALAT PENGUNCI & PENGGANTUNG


1 Kunci Tanam Union 1 x slag bh
Union 2 x slag bh
Yale 1 x slag bh
Yale 2 x slag bh
Kuda 1 x slag bh
Kuda 2 x slag bh
Kunci Silinder bh
2 Engsel dan Grendel
Engsel Angin bh
Kupu-kupu biasa bh
Nylon kupu-kupu bh
Espagnoled lokal bh
Grendel biasa bh
Kait Angin bh
Door Stop bh
Door closer bh
XIII BAHAN SANITAIR
1 Kloset Duduk Ex. TOTO bh
2 Kloset Jongkok Ex. TOTO bh
3 Wastafel Ex. TOTO bh
4 Wasbak 1 Lubang bh
5 Tempat Sabun Tanam bh
6 Kran Air bh
7 Tangki Air Merk Penguin 500 ltr
8 Tangki Air Merk Penguin 1000 ltr
9 Floor Drain bh
10 Seal Tafe bh
11 Urinoir bh
XIV ALAT PENGIKAT KAYU
1 Paku Usuk kg
2 Paku - reng kg
3 Paku - triplek kg
4 Paku - payung kg
5 Paku - sekrup kg
6 Paku - beton kg
7 Mur Baut (kuda-kuda) kg
8 Angkur Baut bh
9 Lem Kayu kg
10 Tali Ijuk kg

XV POMPA AIR
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh
2 POMPA AIR LISTRIK
Sanyo . 125 watt bh
Shimizu . 125 watt bh
Dab . 125 watt bh

XVI PAVING BLOCK


1 Paving tebal 8 cm (lokal) m2
2 Paving tebal 6 cm (lokal) m2
3 Paving tebal 6 cm K. 250 (abu-abu) m2
4 Paving tebal 6 cm K. 250 (merah) m2
5 Paving tebal 6 cm K. 250 (biru) m2
6 Paving tebal 6 cm K. 250 (kuning) m2
7 Paving tebal 8 cm K. 300 (abu-abu) m2
8 Paving tebal 8 cm K. 300 (merah) m2
9 Paving tebal 8 cm K. 300 (kuning) m2
10 Paving tebal 8 cm K. 300 (hijau) m2
11 Paving tebal 8 cm K. 300 (biru) m2
12 Kanstin (A1/40) bj
13 Kanstin (B2,B6/50 cm) bj
14 Kanstin (K3) bj
15 Kanstin (K5) bj
16 Raam (65 cm) bj
17 Raam (30 cm) bj
18 Paving Difabel bj
19 Grass Block m2

XVII LAIN -LAIN


1 Naco per Daun bh
2 Minyak Beton & bekisting ltr
3 Air ltr
4 Solar ltr
5 Minyak pelumas ltr
6 Besi Scuare Tube
7 Besi Lis Kaca (1 x 1) cm
8 Sunscreen Alluminium
9 Lem kayu kg
10 Formika lb
11 Soda Api kg
12 Sabun kg
13 Residu atau Ter lt
14 Wallpaper m2
15 Sewa Alat jam
16 Keramik 30 X 30 cm (Ex. Roman) m2
40 X 40 cm (Ex. Roman) m2
20 x 20 cm (Ex. Roman) m2
20 x 25 cm (Ex. Roman) m2
17 HB-10 bh
18 Semen Merah m3
19 Bilik Bambu m2
20 List Kayu 2/4 m1
21 Genteng Kodok bh
22 Genteng Kodok Glazuur bh
23 Kerpus Kodok bh
24 Kerpus Kodok Glazuur bh
25 Genteng Metal ex Rainbow (Stone) m2
26 Harflex Motif Sirap lbr
27 Nok Genteng Metal (NAS) bh
28 Bak fibreglass bh
29 Porselen 11 x 11 cm bh
30 Water Drain bh
31 Door Holder bh
32 Kunci Slot bh
33 Rel Pintu set
34 Kunci Tanam Antik bh
35 Kunci Lemari bh
36 Kaca Patri 7 mm (Timah) m2
37 Kaca Cermin 5 mm m2
38 Kaca Buram 5 mm m2
39 Sealant tube
40 Asbes Langit-Langit m2
41 Asbes Semen m2
42 Profil Allum"T" m
43 Kawat dia 4 mm kg
44 Ramset bh
45 Ubin Teralux 40 x 40 cm bh
46 Ubin Teralux 30 x 30 cm bh
47 Ubin Teralux Marmer 60 x 60 cm bh
48 Ubin Teralux Marmer 40 x 40 cm bh
49 Ubin Teralux Marmer 30 x 30 cm bh
50 Sunscreen Alluminium m2
51 Skrup Fixer bh
52 Alumunium Strip m
53 Profil Kaca m
54 Vertical Blinds m2
55 Paku Skrup bh
56 Keramik 33 x 33 cm (Ex. Roman) m2
57 Ubin Teralux Marmer 100 x 100 cm bh
58 Paving tebal 8 cm (lokal) m2
59 Paving tebal 6 cm (lokal) m2
60 Paving tebal 8 cm SNI (Ex. Diamond) m2
61 Paving tebal 6 cm SNI (Ex. Diamond) m2
62 Keramik 10 x 33 cm bh
63 Keramik 10 x 20 cm bh
64 Keramik 10 x 10 cm bh
65 Keramik 5 x 20 cm bh
66 Marmer 100 x 100 cm bh
67 Karpet m2
68 Porselen 11 x 11cm bh
69 Keramik Artistik 10 cm x 20 cm bh
70 Keramik Artistik 5 cm x 20 cm bh
71 Paku 12 cm bh
72 Plint Vynil 15 cm x 30 cm bh
73 Lantai Vynil Ukuran 30 cm x 30 cm bh

74 Reng Jati m3
75 Reng Jati 3/4 m3
76 Tali rapia m
77 Karung Plastik bh
78 Batu Muka m2
79 Geotekstil m3
80 Kalsiboard 6 mm lbr
81 GRC 6 mm lbr
- Hollow GT 2/4 tebal 0,4 mm btg
- Hollow GT 4/4 tebal 0,4 mm btg
5 Paving tebal 6 cm K. 250 (hijau) m2
Cermin 3 mm m2
Kaca Patri 7 mm (Kuningan) m2
Es Kabur 3 mm m2
Cat dasar 2.5 kg
Polikarbonat Twinlite 5 mm (2.1 x 11.8 m) lbr
HARGA
(Rp)

220,000
220,000
225,000
230,000
235,000
180,000
270,000
260,000
250,000
150,000
150,000
240,000
250,000
65,000
65,000
270,000
-
48,000
90,000
14,000
750
-
-
-
210,000
-
9,500
10,300
19,000
22,000
-
4,500
8,500
2,000
5,500
4,500
3,000
7,500
-
87,500
100,000
125,000
-
52,000
58,500
68,000
77,500
88,000
96,500
-
58,000
75,000
-
45,000
35,000
-
-
81,000
85,000
92,000
90,000
94,300
107,000
-
38,500
42,000
-
48,800
65,300
-
-
25,000,000
22,500,000
10,250,000
9,100,000
7,600,000
6,900,000
6,400,000
5,700,000
14,000,000
12,100,000
2,500,000
-
-
25,000
13,000
-
-
-
-
85,000
75,000
100,000
90,000
10,500
8,500
8,000
10,000
50,000
59,000
52,000
55,000
20,000
240,000
-
110,000
-
120,000
-
185,000
92,500
250,000
275,000
475,000
-
-
-
65,000
72,000
80,000
97,000
109,000
115,000
160,000
55,000
60,000
-
215,000
-
12,000
-
-
12,650
12,650
13,800
-
19,800
40,000
35,000
37,500
18,000
175,000
20,000
65,000
-
39,000
32,000
-
195,000
220,000
260,000
378,000
450,000
495,000
1,750,000
385,000
80,000
72,000
525,000
-
-
-
22,500
28,700
39,200
67,600
86,500
170,100
281,700
120,000
-
90,000
117,000
153,000
212,400
260,000
310,000
-
-
20,000
25,000
38,000
9,000
70,000
75,000
65,000
-
-
-
95,700
125,000
-
50,700
62,700
81,200
-
125,000
174,200
218,600
241,700
79,000
20,000
-
-
-
32,500
32,500
4,500
36,000
59,000
17,100
62,000
38,000
77,500
15,000
-
-
27,000
155,000
250,000
-
-
45,000
54,000
52,000
20,000
24,000
-
185,000
-
82,000
115,000
280,000
170,000
130,000
245,000
715,000
-
-
-
4,000
5,000
7,500
8,600
15,000
13,000
20,000
35,000
8,000
12,500
31,000
-
-
23,500
15,000
-
-
120,000
230,000
330,000
-
12,000
15,000
14,000
22,500
-
15,000
21,000
-
-
17,500
72,000
-
-
52,000
67,000
80,000
135,000
50,000
60,000
145,000
-
20,000
25,000
27,500
50,000
12,000
16,000
62,000
350,000
-
2,460,000
459,000
900,000
250,000
35,000
70,000
1,100,000
1,750,000
40,000
9,000
1,800,000
-
17,200
20,000
21,000
31,600
15,000
20,000
15,000
14,000
25,000
8,000

320,000

575,000
450,000
520,000

98,500
72,400
99,600
121,000
213,500
149,500
144,900
166,000
196,900
223,300
297,500
92,600
45,600
51,100
46,500
83,300
48,800
45,900
132,000

37,500
9,000
50
13,000
35,000
-
-
-
25,000
75,000
25,000
12,000
15,000
50,000
45,000
120,000
125,000
105,000
95,000
5,000
185,000
22,000
4,500
2,500
5,000
7,500
8,500
229,500
38,000
45,000
275,000
500
55,000
125,000
175,000
235,000
160,000
20,000
2,750,000
245,000
160,000
75,000
-
-
8,500
16,000
22,000
-
-
95,400
38,200
20,200
325,000
750
9,000
10,000
125,000
500
122,000
95,400
98,500
72,400
98,000
77,000
5,200
2,650
5,250
5,200
480,000
127,500
500
20,000
15,000
500
15,000
24,000
-
8,625,000
8,625,000
500
1,500
70,000
40,000
130,000
165,000
25,000
29,000
170,000
150,000
3,750,000
120,000
36,000
2,700,000
III DAFTAR ANALISA HARGA SATUAN PEKERJAAN
PEKERJAAN KONSTRUKSI DIKONTRAKAN (TANPA PPN)
PEMERINTAH KOTA SURAKARTA TAHUN 2015
UNTUK PEKERJAAN TANPA ALAT BERAT

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

A. 2.2.1.2 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.200 54,000.00
Tukang Kayu L.02 OH 0.400 68,000.00
Kepala Tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.020 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Ǿ 8-10/400 cm Batang 1.250 25,000.00
Semen portland Kg 2.50 1,200.00
Seng gelombang Lbr 1.20 65,300.00
Pasir beton m3 0.005 250,000.00
Koral beton m3 0.009 180,000.00
Kayu 5/7 kruing m3 0.072 6,900,000.00
Paku biasa 2” – 5” Kg 0.060 17,200.00
Meni besi Liter 0.45 32,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.10 54,000.00
Tukang Kayu L.02 OH 0.10 68,000.00
Kepala Tukang L.03 OH 0.01 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 kruing m3 0.012 6,900,000.00
Paku 2”-3” Kg 0.02 17,200.00
Kayu papan 3/20 sengon m3 0.007 2,500,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 10% x D
A. 2.2.1.9.
F Pembersihan
Harga 1 m2 lapangan
Satuan Pekerjaan (D+E)dan perataan

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.10 54,000.00
Mandor L.04 OH 0.05 71,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN

14
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 10% x D
F Harga
A. 2.2.1.10. Satuan Pekerjaan
Pembuatan (D+E)
1 m2 steger/perancah dari bambu

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.00 54,000.00
Tukang Kayu L.02 OH 2.00 68,000.00
Kepala Tukang L.03 OH 0.20 69,000.00
Mandor L.04 OH 0.05 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bambu diameter 6-8/600 cm Batang 1.25 13,000.00
Tali ijuk m3 0.186 8,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D
E Overhead & Profit (Contoh 10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 13.334 54,000.00
Mandor L.04 OH 0.666 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 6.667 54,000.00
Mandor L.04 0.333 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)

15
Jumlah
Harga
(Rp)

10,800.00
27,200.00
1,380.00
1,420.00
40,800.00

31,250.00
3,000.00
78,360.00
1,250.00
1,620.00
496,800.00
1,032.00
14,625.00
627,937.00

668,737.00
66,873.70
735,610.70

Jumlah
Harga
(Rp)

5,400.00
6,800.00
690.00
355.00
13,245.00

82,800.00
344.00
17,500.00
100,644.00

113,889.00
11,388.90
125,277.90

Jumlah
Harga
(Rp)

5,400.00
3,550.00
8,950.00

16
-

8,950.00
895.00
9,845.00

Jumlah
Harga
(Rp)

54,000.00
136,000.00
13,800.00
3,550.00
207,350.00

16,250.00
1,488.00
17,738.00

225,088.00
22,508.80
247,596.80

Jumlah
Harga
(Rp)

720,036.00
47,286.00
767,322.00

767,322.00
76,732.20
844,054.20

Jumlah
Harga
(Rp)

360,018.00
23,643.00
383,661.00

383,661.00
38,366.10
422,027.10

17
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A. TENAGA
Pekerja L.01 OH 0.750 54,000.00
Mandor L.04 OH 0.025 71,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A. TENAGA
Pekerja L.01 OH 0.900 54,000.00
Mandor L.01 OH 0.045 71,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A. TENAGA
Pekerja L.01 OH 1.050 54,000.00
Mandor L.01 OH 0.067 71,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A. TENAGA
Pekerja L.01 OH 1.000 54,000.00
Mandor L.04 OH 0.032 71,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

16
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

17
A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A. TENAGA
Pekerja L.01 OH 1.500 54,000.00
Mandor L.04 OH 0.060 71,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A. TENAGA
Pekerja L.01 OH 1.200 54,000.00
Mandor L.04 OH 0.045 71,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A. TENAGA
Pekerja L.01 OH 0.050 54,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.2.3.1.8. Pembuangan 1 m3 tanah sejauh 30 meter


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A. TENAGA
Pekerja L.01 OH 0.330 54,000.00
Mandor L.04 OH 0.010 71,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

18
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

19
A.2.3.1.9. Pengurukan kembali 1 m3 galian tanah
Pengurungan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A. TENAGA
Pekerja L.01 OH 0.500 54,000.00
Mandor L.04 OH 0.050 71,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.2.3.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm)


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A. TENAGA
Pekerja L.01 OH 0.500 54,000.00
Mandor L.04 OH 0.050 71,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Mandor L.04 OH 0.010 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug m3 1.200 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

20
A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP:3PP:7TL
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.800 54,000.00
Tukang L.02 OH 0.400 66,000.00
Kepala Tukang L.03 OH 0.040 69,000.00
Mandor L.04 OH 0.080 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kapur m3 0.135 270,000.00
Pasir Pasang m3 0.400 240,000.00
Tanah Liat m3 0.948 65,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.150 54,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ijuk m3 6.000 8,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.250 54,000.00
Mandor L.04 OH 0.025 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sirtu m3 1.200 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

21
Jumlah
Harga
(Rp)

40,500.00
1,775.00
42,275.00

42,275.00
4,227.50
46,502.50

Jumlah
Harga
(Rp)

48,600.00
3,195.00
51,795.00

51,795.00
5,179.50
56,974.50

Jumlah
Harga
(Rp)

56,700.00
4,757.00
61,457.00

61,457.00
6,145.70
67,602.70

Jumlah
Harga
(Rp)

54,000.00
2,272.00
56,272.000

22
56,272.00
5,627.20
61,899.20

23
Jumlah
Harga
(Rp)

81,000.00
4,260.00
85,260.00

85,260.00
8,526.00
93,786.00

Jumlah
Harga
(Rp)

64,800.00
3,195.00
67,995.00

67,995.00
6,799.50
74,794.50

Jumlah
Harga
(Rp)

2,700.00
355.00
3,055.00

3,055.00
305.50
3,360.50

Jumlah
Harga
(Rp)

17,820.00
710.00
18,530.00

18,530.00

24
1,853.00
20,383.00

25
Jumlah
Harga
(Rp)

27,000.00
3,550.00
30,550.00

30,550.00
3,055.00
33,605.00

Jumlah
Harga
(Rp)

27,000.00
3,550.00
30,550.00

30,550.00
3,055.00
33,605.00

Jumlah
Harga
(Rp)

16,200.00
710.00
16,910.00

180,000.00
180,000.00

196,910.00
19,691.00
216,601.00

26
Jumlah
Harga
(Rp)

43,200.00
26,400.00
2,760.00
5,680.00
78,040.00

36,450.00
96,000.00
61,620.00
194,070.00

272,110.00
27,211.00
299,321.00

Jumlah
Harga
(Rp)

8,100.00
1,065.00
9,165.00

48,000.00
48,000.00

57,165.00
5,716.50
62,881.50

Jumlah
Harga
(Rp)

13,500.00
1,775.00
15,275.00

180,000.00
180,000.00

195,275.00
19,527.50
214,802.50

27
C. PEKERJAAN PONDASI :

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.500 54,000.00
Tukang Batu L.02 OH 0.750 66,000.00
Kepala Tukang L.03 OH 0.075 69,000.00
Mandor L.04 OH 0.075 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 220,000.00
Semen Portlan Kg 202.000 1,200.00
Pasir Pasang m3 0.485 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.500 54,000.00
Tukang Batu L.02 OH 0.750 66,000.00
Kepala Tukang L.03 OH 0.075 69,000.00
Mandor L.04 OH 0.075 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 220,000.00
Semen Portlan Kg 163.000 1,200.00
Pasir Pasang m3 0.520 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.500 54,000.00
Tukang Batu L.02 OH 0.750 66,000.00
Kepala Tukang L.03 OH 0.075 69,000.00
Mandor L.04 OH 0.075 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 220,000.00
Semen Portlan Kg 136.000 1,200.00
Pasir Pasang m3 0.544 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

20
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

21
A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.500 54,000.00
Tukang Batu L.02 OH 0.750 66,000.00
Kepala Tukang L.03 OH 0.075 69,000.00
Mandor L.04 OH 0.075 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 220,000.00
Semen Portlan Kg 117.000 1,200.00
Pasir Pasang m3 0.561 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.500 54,000.00
Tukang Batu L.02 OH 0.750 66,000.00
Kepala Tukang L.03 OH 0.075 69,000.00
Mandor L.04 OH 0.075 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 220,000.00
Semen Portlan Kg 91.000 1,200.00
Pasir Pasang m3 0.584 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.500 54,000.00
Tukang Batu L.02 OH 0.750 66,000.00
Kepala Tukang L.03 OH 0.075 69,000.00
Mandor L.04 OH 0.075 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 220,000.00
Kapur m3 0.170 270,000.00
Semen Portlan Kg 0.170 1,200.00
Pasir Pasang m3 0.340 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

22
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

23
A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.500 54,000.00
Tukang Batu L.02 OH 0.750 66,000.00
Kepala Tukang L.03 OH 0.075 69,000.00
Mandor L.04 OH 0.075 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 220,000.00
Semen Portlan Kg 61.000 1,200.00
Kapur m3 0.147 270,000.00
Pasir Pasang m3 0.492 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.3.2.1.8.Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.500 54,000.00
Tukang Batu L.02 OH 0.750 66,000.00
Kepala Tukang L.03 OH 0.075 69,000.00
Mandor L.04 OH 0.075 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 220,000.00
Semen Portlan Kg 41.000 1,200.00
Kapur m3 0.131 270,000.00
Pasir Pasang m3 0.523 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping)


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.780 54,000.00
Tukang Batu L.02 OH 0.390 66,000.00
Kepala Tukang L.03 OH 0.039 69,000.00
Mandor L.04 OH 0.039 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 220,000.00
Pasir urug m3 0.432 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

24
A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah

25
A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 3.400 54,000.00
Tukang Batu L.02 OH 0.850 66,000.00
Kepala Tukang L.03 OH 0.085 69,000.00
Mandor L.04 OH 0.170 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 0.480 220,000.00
Semen Portlan Kg 194.000 1,200.00
Pasir Beton m3 0.312 250,000.00
Kerikil 2/3 m3 0.468 250,000.00
Besi beton Kg 126.000 12,650.00
Kawat beton Kg 1.800 19,800.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 2.400 54,000.00
Tukang Batu L.02 OH 0.800 66,000.00
Kepala Tukang L.03 OH 0.080 69,000.00
Mandor L.04 OH 0.119 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 0.450 220,000.00
Semen Portlan Kg 194.000 1,200.00
Pasir Beton m3 0.312 250,000.00
Kerikil 2/3 m3 0.468 250,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

26
Jumlah
Harga
(Rp)

81,000.00
49,500.00
5,175.00
5,325.00
141,000.00

264,000.00
242,400.00
116,400.00
622,800.00

0.00

763,800.00
76,380.00
840,180.00

Jumlah
Harga
(Rp)

81,000.00
49,500.00
5,175.00
5,325.00
141,000.00

264,000.00
195,600.00
124,800.00
584,400.00

0.00

725,400.00
72,540.00
797,940.00

Jumlah
Harga
(Rp)

81,000.00
49,500.00
5,175.00
5,325.00
141,000.00

264,000.00
163,200.00
130,560.00
557,760.00

0.00

27
698,760.00
69,876.00
768,636.00

28
Jumlah
Harga
(Rp)

81,000.00
49,500.00
5,175.00
5,325.00
141,000.00

264,000.00
140,400.00
134,640.00
539,040.00

0.00

680,040.00
68,004.00
748,044.00

Jumlah
Harga
(Rp)

81,000.00
49,500.00
5,175.00
5,325.00
141,000.00

264,000.00
109,200.00
140,160.00
513,360.00

0.00

654,360.00
65,436.00
719,796.00

Jumlah
Harga
(Rp)

81,000.00
49,500.00
5,175.00
5,325.00
141,000.00

264,000.00
45,900.00
204.00
81,600.00
391,704.00

0.00

532,704.00

29
53,270.40
585,974.40

30
Jumlah
Harga
(Rp)

81,000.00
49,500.00
5,175.00
5,325.00
141,000.00

264,000.00
73,200.00
39,690.00
118,080.00
494,970.00

0.00

635,970.00
63,597.00
699,567.00

Jumlah
Harga
(Rp)

81,000.00
49,500.00
5,175.00
5,325.00
141,000.00

264,000.00
49,200.00
35,370.00
125,520.00
474,090.00

0.00

615,090.00
61,509.00
676,599.00

Jumlah
Harga
(Rp)

42,120.00
25,740.00
2,691.00
2,769.00
73,320.00

264,000.00
64,800.00
328,800.00

0.00

402,120.00
40,212.00
442,332.00

31
si siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah

32
Jumlah
Harga
(Rp)

183,600.00
56,100.00
5,865.00
12,070.00
257,635.00

105,600.00
232,800.00
78,000.00
117,000.00
1,593,900.00
35,640.00
2,162,940.00

0.00

2,420,575.00
242,057.50
2,662,632.50

Jumlah
Harga
(Rp)

129,600.00
52,800.00
5,520.00
8,449.00
196,369.00

99,000.00
232,800.00
78,000.00
117,000.00
526,800.00

0.00

723,169.00
72,316.90
795,485.90

33
G. A.4.1.1
PEKERJAAN BETON
HARGA :
SATUAN PEKERJAAN BETON

A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K100)


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.650 54,000.00
Tukang Batu L.02 OH 0.275 66,000.00
Kepala Tukang L.03 OH 0.028 69,000.00
Mandor L.04 OH 0.083 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 247 1,200.00
Pasir Beton kg 869 178.57
Kerikil 2/3 kg 999 192.31
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125)


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.650 54,000.00
Tukang Batu L.02 OH 0.275 66,000.00
Kepala Tukang L.03 OH 0.028 69,000.00
Mandor L.04 OH 0.083 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. Semen Portland kg 276.000 1,200.00
2. Pasir Beton kg 828 178.57
3. Kerikil 2/3 kg 1012 192.31
4. Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150)


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.650 54,000.00
Tukang Batu L.02 OH 0.275 66,000.00
Kepala Tukang L.03 OH 0.028 69,000.00
Mandor L.04 OH 0.083 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 299.000 1,200.00
Pasir Beton kg 799 178.57
Kerikil 2/3 kg 1017 192.31
Air Liter 215 50.00
JUMLAH HARGA BAHAN

24
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bulking factor pasir = 20 %

25
A.A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100) slump (3-6) cm, w/c =
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.200 54,000.00
Tukang Batu L.02 OH 0.200 66,000.00
Kepala Tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.060 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 230.000 1,200.00
Pasir Beton kg 893 178.57
Kerikil 2/3 kg 1027 192.31
Air Liter 200 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A. A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.650 54,000.00
Tukang Batu L.02 OH 0.275 66,000.00
Kepala Tukang L.03 OH 0.028 69,000.00
Mandor L.04 OH 0.083 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 326 1,200.00
Pasir Beton kg 760 178.57
Kerikil 2/3 kg 1029 192.31
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A. A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.650 54,000.00
Tukang Batu L.02 OH 0.275 66,000.00
Kepala Tukang L.03 OH 0.028 69,000.00
Mandor L.04 OH 0.083 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 352 1,200.00
Pasir Beton kg 731 178.57
Kerikil 2/3 kg 1031 192.31
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

26
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

27
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.650 54,000.00
Tukang Batu L.02 OH 0.275 66,000.00
Kepala Tukang L.03 OH 0.028 69,000.00
Mandor L.04 OH 0.083 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 371.000 1,200.00
Pasir Beton kg 698 178.57
Kerikil 2/3 kg 1047 192.31
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.650 54,000.00
Tukang Batu L.02 OH 0.275 66,000.00
Kepala Tukang L.03 OH 0.028 69,000.00
Mandor L.04 OH 0.083 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 384 1,200.00
Pasir Beton kg 692 178.57
Kerikil 2/3 kg 1039 192.31
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.650 54,000.00
Tukang Batu L.02 OH 0.275 66,000.00
Kepala Tukang L.03 OH 0.028 69,000.00
Mandor L.04 OH 0.083 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 406.000 1,200.00
Pasir Beton kg 684 178.57
Kerikil 2/3 kg 1026 192.31
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

28
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

29
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.650 54,000.00
Tukang Batu L.02 OH 0.275 69,000.00
Kepala Tukang L.03 OH 0.028 69,000.00
Mandor L.04 OH 0.083 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 413.000 1,200.00
Pasir Beton m3 681 178.57
Kerikil 2/3 m3 1021 192.31
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 2.100 54,000.00
Tukang Batu L.02 OH 0.350 66,000.00
Kepala Tukang L.03 OH 0.035 69,000.00
Mandor L.04 OH 0.105 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 439.000 1,200.00
Pasir Beton kg 670 178.57
Kerikil 2/3 kg 1006 192.31
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 2.100 54,000.00
Tukang Batu L.02 OH 0.350 66,000.00
Kepala Tukang L.03 OH 0.035 69,000.00
Mandor L.04 OH 0.105 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 448.000 1,200.00
Pasir Beton kg 667 178.57
Kerikil 2/3 kg 1000 192.31
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

30
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

31
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.070 54,000.00
Tukang Besi L.02 OH 0.070 68,000.00
Kepala Tukang L.03 OH 0.007 69,000.00
Mandor L.04 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton (polos / ulir) kg 10.500 12,650.00
Kawat beton kg 0.150 19,800.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.025 54,000.00
Tukang Besi L.02 OH 0.025 68,000.00
Kepala Tukang L.03 OH 0.025 69,000.00
Mandor L.04 OH 0.001 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. Jaring kawat baja dilas kg 10.200 12,650.00
2. Kawat beton kg 0.050 19,800.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.520 54,000.00
Tukang Kayu L.02 OH 0.260 68,000.00
Kepala Tukang L.03 OH 0.026 69,000.00
Mandor L.04 OH 0.026 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.040 2,500,000.00
Paku 5 – 10 cm kg 0.300 17,200.00
Minyak bekisting Liter 0.100 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

32
A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.520 54,000.00
Tukang Kayu L.02 OH 0.260 68,000.00
Kepala Tukang L.03 OH 0.026 69,000.00
Mandor L.04 OH 0.026 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu sengon m3 0.045 2,500,000.00
Paku 5 cm – 10 cm kg 0.300 17,200.00
Minyak bekisting Liter 0.100 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.660 54,000.00
Tukang Kayu L.02 OH 0.330 68,000.00
Kepala Tukang L.03 OH 0.033 69,000.00
Mandor L.04 OH 0.033 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.040 2,500,000.00
Paku 5 cm – 12 cm kg 0.400 17,200.00
Minyak bekisting Liter 0.200 9,000.00
Balok kayu Meranti m3 0.015 5,700,000.00
Plywood tebal 9 mm Lbr 0.350 125,000.00
Bambu Batang 2.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.660 54,000.00
Tukang Kayu L.02 OH 0.330 68,000.00
Kepala Tukang L.03 OH 0.033 69,000.00
Mandor L.04 OH 0.033 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.040 2,500,000.00
Paku 5 cm – 12 cm kg 0.400 17,200.00
Minyak bekisting Liter 0.200 9,000.00
Balok kayu Meranti m3 0.018 5,700,000.00
Plywood tebal 9 mm Lbr 0.350 125,000.00
Bambu Batang 2.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN

33
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

34
A.4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.660 54,000.00
Tukang Kayu L.02 OH 0.330 68,000.00
Kepala Tukang L.03 OH 0.033 69,000.00
Mandor L.04 OH 0.033 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.040 2,500,000.00
Paku 5 cm – 12 cm kg 0.400 17,200.00
Minyak bekisting Liter 0.200 9,000.00
Balok kayu Meranti m3 0.015 5,700,000.00
Plywood tebal 9 mm Lbr 0.350 125,000.00
Bambu Batang 6.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.1.1.25 Pemasangan 1 m2 bekisting untuk dinding


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.660 54,000.00
Tukang Kayu L.02 OH 0.330 68,000.00
Kepala Tukang L.03 OH 0.033 69,000.00
Mandor L.04 OH 0.033 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.030 2,500,000.00
Paku 5 cm – 12 cm kg 0.400 17,200.00
Minyak bekisting Liter 0.200 9,000.00
Balok kayu Meranti m3 0.020 5,700,000.00
Plywood tebal 9 mm Lbr 0.350 125,000.00
Bambu Batang 3.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.1.1.26 Pemasangan 1 m2 bekisting untuk tangga


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.660 54,000.00
Tukang Kayu L.02 OH 0.330 68,000.00
Kepala Tukang L.03 OH 0.033 69,000.00
Mandor L.04 OH 0.033 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.030 2,500,000.00
Paku 5 cm – 12 cm kg 0.400 17,200.00
Minyak bekisting Liter 0.150 9,000.00
Balok kayu Meranti m3 0.015 5,700,000.00
Plywood tebal 9 mm Lbr 0.350 125,000.00
Bambu Batang 2.000 13,000.00

35
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

36
A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.150 54,000.00
Tukang Kayu L.02 OH 0.050 68,000.00
Kepala Tukang L.03 OH 0.005 69,000.00
Mandor L.04 OH 0.008 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kruing (papan) m3 0.0264 7,600,000.00
Paku 5 cm – 12 cm kg 0.600 17,200.00
Bambu Batang 0.500 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga
A.4.1.1.28 Satuan1Pekerjaan
Membuat m3 pondasi (D+E)
beton bertulang (150 kg besi + bekisting)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 5.300 54,000.00
Tukang batu L.02 OH 0.275 66,000.00
Tukang kayu L.02 OH 1.300 68,000.00
Tukang besi L.02 OH 1.050 68,000.00
Kepala tukang L.03 OH 0.262 69,000.00
Mandor L.04 OH 0.265 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.200 2,500,000.00
Paku 5 cm – 12 cm kg 1.500 17,200.00
Minyak bekisting Liter 0.400 9,000.00
Besi beton polos kg 157.500 12,650.00
Kawat beton kg 2.250 19,800.00
Semen Portland kg 336.000 1,200.00
Pasir Beton m3 0.540 250,000.00
Kerikil 2/3 m3 0.810 250,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

37
A.4.1.1.29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 5.650 54,000.00
Tukang batu L.02 OH 0.275 66,000.00
Tukang kayu L.02 OH 1.560 68,000.00
Tukang besi L.02 OH 1.400 68,000.00
Kepala tukang L.03 OH 0.323 69,000.00
Mandor L.04 OH 0.283 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.270 2,500,000.00
Paku 5 cm – 12 cm kg 2.000 17,200.00
Minyak bekisting Liter 0.600 9,000.00
Besi beton polos kg 210.000 12,650.00
Kawat beton kg 3.000 19,800.00
Semen Portland kg 336.000 1,200.00
Pasir Beton m3 0.540 250,000.00
Kerikil 2/3 m3 0.810 250,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.1.1.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 7.050 54,000.00
Tukang batu L.02 OH 0.275 66,000.00
Tukang kayu L.02 OH 1.650 68,000.00
Tukang besi L.02 OH 2.100 68,000.00
Kepala tukang L.03 OH 0.403 69,000.00
Mandor L.04 OH 0.353 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.400 2,500,000.00
Paku 5 cm – 12cm kg 4.000 17,200.00
Minyak bekisting Liter 2.000 9,000.00
Besi beton polos kg 315.000 12,650.00
Kawat beton kg 4.500 19,800.00
Semen Portland kg 336.000 1,200.00
Pasir Beton m3 0.540 250,000.00
Kerikil 2/3 m3 0.810 250,000.00
Kayu Meranti balok M3 0.150 5,700,000.00
Plywood 9 mm Lbr 3.500 125,000.00
Bambu Batang 20.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

38
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 6.350 54,000.00
Tukang batu L.02 OH 0.275 66,000.00
Tukang kayu L.02 OH 1.650 68,000.00
Tukang besi L.02 OH 1.400 68,000.00
Kepala tukang L.03 OH 0.333 69,000.00
Mandor L.04 OH 0.318 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.320 2,500,000.00
Paku 5 cm – 12 cm kg 3.200 17,200.00
Minyak bekisting Liter 1.600 9,000.00
Besi beton polos kg 210.000 12,650.00
Kawat beton kg 3.000 19,800.00
Semen Portland kg 336.000 1,200.00
Pasir Beton m3 0.540 250,000.00
Kerikil 2/3 m3 0.810 250,000.00
Kayu Meranti balok m3 0.140 5,700,000.00
Plywood 9 mm Lembar 2.800 125,000.00
Bambu Batang 16.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.1.1.32 Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 5.300 54,000.00
Tukang batu L.02 OH 0.275 66,000.00
Tukang kayu L.02 OH 1.300 68,000.00
Tukang besi L.02 OH 1.050 68,000.00
Kepala tukang L.03 OH 0.265 69,000.00
Mandor L.04 OH 0.265 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.320 2,500,000.00
Paku 5 cm – 12 cm kg 3.200 17,200.00
Minyak bekisting Liter 1.600 9,000.00
Besi beton polos kg 157.500 12,650.00
Kawat beton kg 2.250 19,800.00
Semen Portland kg 336.000 1,200.00
Pasir Beton m3 0.540 250,000.00
Kerikil 2/3 m3 0.810 250,000.00
Kayu Meranti balok m3 0.120 5,700,000.00
Plywood 9 mm Lembar 2.800 125,000.00
Bambu Batang 32.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

39
A.4.1.1.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 5.300 54,000.00
Tukang batu L.02 OH 0.275 66,000.00
Tukang kayu L.02 OH 1.300 68,000.00
Tukang besi L.02 OH 1.050 68,000.00
Kepala tukang L.03 OH 0.262 69,000.00
Mandor L.04 OH 0.265 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.240 2,500,000.00
Paku 5 cm – 12 cm kg 3.200 17,200.00
Minyak bekisting Liter 1.600 9,000.00
Besi beton polos kg 157.500 12,650.00
Kawat beton kg 2.250 19,800.00
Semen Portland kg 336.000 1,200.00
Pasir Beton m3 0.540 250,000.00
Kerikil 2/3 m3 0.810 250,000.00
Kayu Meranti balok m3 0.160 5,700,000.00
Plywood 9 mm Lembar 2.800 125,000.00
Bambu Batang 24.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.1.1.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 5.650 54,000.00
Tukang batu L.02 OH 0.275 66,000.00
Tukang kayu L.02 OH 1.560 68,000.00
Tukang besi L.02 OH 1.400 68,000.00
Kepala tukang L.03 OH 0.323 69,000.00
Mandor L.04 OH 0.283 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.250 2,500,000.00
Paku 5 cm – 12 cm kg 3.000 17,200.00
Minyak bekisting Liter 1.200 9,000.00
Besi beton polos kg 210.000 12,650.00
Kawat beton kg 3.000 19,800.00
Semen Portland kg 336.000 1,200.00
Pasir Beton m3 0.540 250,000.00
Kerikil 2/3 m3 0.810 250,000.00
Kayu Meranti balok m3 0.105 5,700,000.00
Plywood 9 mm Lembar 2.500 125,000.00
Bambu Batang 14.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

40
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.180 54,000.00
Tukang batu L.02 OH 0.020 66,000.00
Tukang kayu L.02 OH 0.020 68,000.00
Tukang besi L.02 OH 0.020 68,000.00
Kepala tukang L.03 OH 0.006 69,000.00
Mandor L.04 OH 0.009 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.002 2,500,000.00
Paku 5 cm – 12 cm kg 0.010 17,200.00
Minyak bekisting Liter 0 9,000.00
Besi beton polos kg 3.000 12,650.00
Kawat beton kg 0.450 19,800.00
Semen Portland kg 4.000 1,200.00
Pasir Beton m3 0.006 250,000.00
Kerikil 2/3 m3 0.009 250,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.297 54,000.00
Tukang batu L.02 OH 0.033 66,000.00
Tukang kayu L.02 OH 0.033 68,000.00
Tukang besi L.02 OH 0.033 68,000.00
Kepala tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.003 2,500,000.00
Paku 5 cm – 12 cm kg 0.020 17,200.00
Minyak bekisting Liter 0 275,000.00
Besi beton polos kg 3.600 12,650.00
Kawat beton kg 0.050 19,800.00
Semen Portland kg 5.500 1,200.00
Pasir Beton m3 0.009 250,000.00
Kerikil 2/3 m3 0.015 250,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

41
Jumlah
Harga
(Rp)

89,100.00
18,150.00
1,932.00
5,893.00
115,075.00

296,400.00
155,178.57
192,115.38
10,750.00
654,443.96

769,518.96
76,951.90
846,470.85

Jumlah
Harga
(Rp)

89,100.00
18,150.00
1,932.00
5,893.00
115,075.00

331,200.00
147,857.14
194,615.38
10,750.00
684,422.53

799,497.53
79,949.75
879,447.28

Jumlah
Harga
(Rp)

89,100.00
18,150.00
1,932.00
5,893.00
115,075.00

358,800.00
142,678.57
195,576.92
10,750.00
707,805.49

42
-

822,880.49
82,288.05
905,168.54

t isi kerikil = 1.350 kg/m3, Bulking factor pasir = 20 %

43
ntai kerja beton mutu f’c = 7,4 MPa (K 100) slump (3-6) cm, w/c = 0.87
Jumlah
Harga
(Rp)

64,800.00
13,200.00
1,380.00
4,260.00
83,640.00

276,000.00
159,464.29
197,500.00
10,000.00
642,964.29

726,604.29
72,660.43
799,264.71

Jumlah
Harga
(Rp)

89,100.00
18,150.00
1,932.00
5,893.00
115,075.00

391,200.00
135,714.29
197,884.62
10,750.00
735,548.90

850,623.90
85,062.39
935,686.29

Jumlah
Harga
(Rp)

89,100.00
18,150.00
1,932.00
5,893.00
115,075.00

422,400.00
130,535.71
198,269.23
10,750.00
761,954.95

44
877,029.95
87,702.99
964,732.94

45
Jumlah
Harga
(Rp)

89,100.00
18,150.00
1,932.00
5,893.00
115,075.00

445,200.00
124,642.86
201,346.15
10,750.00
781,939.01

897,014.01
89,701.40
986,715.41

Jumlah
Harga
(Rp)

89,100.00
18,150.00
1,932.00
5,893.00
115,075.00

460,800.00
123,571.43
199,807.69
10,750.00
794,929.12

910,004.12
91,000.41
1,001,004.53

Jumlah
Harga
(Rp)

89,100.00
18,150.00
1,932.00
5,893.00
115,075.00

487,200.00
122,142.86
197,307.69
10,750.00
817,400.55

46
932,475.55
93,247.55
1,025,723.10

47
Jumlah
Harga
(Rp)

89,100.00
18,975.00
1,932.00
5,893.00
115,900.00

495,600.00
121,607.14
196,346.15
10,750.00
824,303.30

940,203.30
94,020.33
1,034,223.63

Jumlah
Harga
(Rp)

113,400.00
23,100.00
2,415.00
7,455.00
146,370.00

526,800.00
119,642.86
193,461.54
10,750.00
850,654.40

997,024.40
99,702.44
1,096,726.84

Jumlah
Harga
(Rp)

113,400.00
23,100.00
2,415.00
7,455.00
146,370.00

537,600.00
119,107.14
192,307.69
10,750.00
859,764.84

48
1,006,134.84
100,613.48
1,106,748.32

49
Jumlah
Harga
(Rp)

3,780.00
4,760.00
483.00
284.00
9,307.00

132,825.00
2,970.00
135,795.00

145,102.00
14,510.20
159,612.20

Jumlah
Harga
(Rp)

1,350.00
1,700.00
1,725.00
71.00
4,846.00

129,030.00
990.00
130,020.00

134,866.00
13,486.60
148,352.60

Jumlah
Harga
(Rp)

28,080.00
17,680.00
1,794.00
1,846.00
49,400.00

100,000.00
5,160.00
900.00
106,060.00

155,460.00
15,546.00
171,006.00

50
Jumlah
Harga
(Rp)

28,080.00
17,680.00
1,794.00
1,846.00
49,400.00

112,500.00
5,160.00
900.00
118,560.00

167,960.00
16,796.00
184,756.00

Jumlah
Harga
(Rp)

35,640.00
22,440.00
2,277.00
2,343.00
62,700.00

100,000.00
6,880.00
1,800.00
85,500.00
43,750.00
26,000.00
263,930.00

326,630.00
32,663.00
359,293.00

Jumlah
Harga
(Rp)

35,640.00
22,440.00
2,277.00
2,343.00
62,700.00

100,000.00
6,880.00
1,800.00
102,600.00
43,750.00
26,000.00
281,030.00

51
-

343,730.00
34,373.00
378,103.00

52
Jumlah
Harga
(Rp)

35,640.00
22,440.00
2,277.00
2,343.00
62,700.00

100,000.00
6,880.00
1,800.00
85,500.00
43,750.00
78,000.00
315,930.00

378,630.00
37,863.00
416,493.00

Jumlah
Harga
(Rp)

35,640.00
22,440.00
2,277.00
2,343.00
62,700.00

75,000.00
6,880.00
1,800.00
114,000.00
43,750.00
39,000.00
280,430.00

343,130.00
34,313.00
377,443.00

Jumlah
Harga
(Rp)

35,640.00
22,440.00
2,277.00
2,343.00
62,700.00

75,000.00
6,880.00
1,350.00
85,500.00
43,750.00
26,000.00

53
238,480.00

301,180.00
30,118.00
331,298.00

54
Jumlah
Harga
(Rp)

8,100.00
3,400.00
345.00
568.00
12,413.00

200,640.00
10,320.00
6,500.00
217,460.00

229,873.00
22,987.30
252,860.30

Jumlah
Harga
(Rp)

286,200.00
18,150.00
88,400.00
71,400.00
18,078.00
18,815.00
501,043.00

500,000.00
25,800.00
3,600.00
1,992,375.00
44,550.00
403,200.00
135,000.00
202,500.00
3,307,025.00

3,808,068.00
380,806.80
4,188,874.80

55
Jumlah
Harga
(Rp)

305,100.00
18,150.00
106,080.00
95,200.00
22,287.00
20,093.00
566,910.00

675,000.00
34,400.00
5,400.00
2,656,500.00
59,400.00
403,200.00
135,000.00
202,500.00
4,171,400.00

4,738,310.00
473,831.00
5,212,141.00

Jumlah
Harga
(Rp)

380,700.00
18,150.00
112,200.00
142,800.00
27,807.00
25,063.00
706,720.00

1,000,000.00
68,800.00
18,000.00
3,984,750.00
89,100.00
403,200.00
135,000.00
202,500.00
855,000.00
437,500.00
260,000.00
7,453,850.00

8,160,570.00
816,057.00
8,976,627.00

56
Jumlah
Harga
(Rp)

342,900.00
18,150.00
112,200.00
95,200.00
22,977.00
22,578.00
614,005.00

800,000.00
55,040.00
14,400.00
2,656,500.00
59,400.00
403,200.00
135,000.00
202,500.00
798,000.00
350,000.00
208,000.00
5,682,040.00

6,296,045.00
629,604.50
6,925,649.50

Jumlah
Harga
(Rp)

286,200.00
18,150.00
88,400.00
71,400.00
18,285.00
18,815.00
501,250.00

800,000.00
55,040.00
14,400.00
1,992,375.00
44,550.00
403,200.00
135,000.00
202,500.00
684,000.00
350,000.00
416,000.00
5,097,065.00

5,598,315.00
559,831.50
6,158,146.50

57
Jumlah
Harga
(Rp)

286,200.00
18,150.00
88,400.00
71,400.00
18,078.00
18,815.00
501,043.00

600,000.00
55,040.00
14,400.00
1,992,375.00
44,550.00
403,200.00
135,000.00
202,500.00
912,000.00
350,000.00
312,000.00
5,021,065.00

5,522,108.00
552,210.80
6,074,318.80

Jumlah
Harga
(Rp)

305,100.00
18,150.00
106,080.00
95,200.00
22,287.00
20,093.00
566,910.00

625,000.00
51,600.00
10,800.00
2,656,500.00
59,400.00
403,200.00
135,000.00
202,500.00
598,500.00
312,500.00
182,000.00
5,237,000.00

5,803,910.00
580,391.00
6,384,301.00

58
Jumlah
Harga
(Rp)

9,720.00
1,320.00
1,360.00
1,360.00
414.00
639.00
14,813.00

5,000.00
172.00
-
37,950.00
8,910.00
4,800.00
1,500.00
2,250.00
60,582.00

75,395.00
7,539.50
82,934.50

Jumlah
Harga
(Rp)

16,038.00
2,178.00
2,244.00
2,244.00
690.00
1,065.00
24,459.00

7,500.00
344.00
-
45,540.00
990.00
6,600.00
2,250.00
3,750.00
66,974.00

91,433.00
9,143.30
100,576.30

59
K. PEKERJAAN BESI DAN ALUMUNIUM :

A.4.2.1.1. Pemasangan 1 kg besi profil


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.060 54,000.00
Tukang Las Konstruksi L.03 OH 0.060 66,000.00
Kepala tukang L.03 OH 0.006 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi Profil Kg 1.150 13,800.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.060 54,000.00
Tukang Las Konstruksi L.03 OH 0.060 66,000.00
Kepala tukang L.03 OH 0.006 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi Baja IWF Kg 1.150 13,800.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.100 54,000.00
Tukang Besi Konstruksi L.03 OH 0.100 68,000.00
Kepala tukang L.03 OH 0.001 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Solar Liter 1.000 13,000.00
Minyak pelumas Liter 0.100 35,000.00
JUMLAH HARGA BAHAN
C PERALATAN
1. Sewa alat Jam 0.800 45,000.00
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

36
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.050 54,000.00
Tukang Las Biasa L.03 OH 1.050 66,000.00
Kepala tukang L.03 OH 0.105 69,000.00
Mandor L.04 OH 0.052 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi siku L 30.30.3 Kg 15.000 13,800.00
Besi plat baja Kg 32.800 12,650.00
Kawat las Kg 0.05 65,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.040 54,000.00
Tukang Besi Konstruksi L.03 OH 0.020 68,000.00
Kepala tukang L.03 OH 0.002 69,000.00
Mandor L.04 OH 0.002 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kawat las listrik Kg 0.400 65,000.00
Solar Liter 0.300 13,000.00
Minyak pelumas Liter 0.040 35,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Sewa alat Jam 0.170 45,000.00
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.440 54,000.00
Tukang L.03 OH 0.440 68,000.00
Kepala tukang L.03 OH 0.044 69,000.00
Mandor L.04 OH 0.022 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pintu lipat m2 1.000 385,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D

37
F. Harga Satuan Pekerjaan (D+E)

38
A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.000 54,000.00
Tukang Khusus Alumunium L.03 OH 1.000 68,000.00
Kepala tukang L.03 OH 0.100 69,000.00
Mandor L.04 OH 0.050 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rolling dor alluminium m2 1.000 525,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.043 54,000.00
Tukang Khusus Alumunium L.03 OH 0.043 68,000.00
Kepala tukang L.03 OH 0.0043 69,000.00
Mandor L.04 OH 0.0021 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Profil alluminium m 1.100 80,000.00
Skrup fixer buah 2.000 750.00
Sealant Tube 0.060 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.085 54,000.00
Tukang Khusus Allumunium L.03 OH 0.085 68,000.00
Kepala tukang L.03 OH 0.0085 69,000.00
Mandor L.04 OH 0.0042 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Profil alluminium m 4.400 80,000.00
Alluminium strip m 14.600 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

39
A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.085 54,000.00
Tukang Allumunium/Kaca L.03 OH 0.085 68,000.00
Kepala tukang L.03 OH 0.009 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pintu alluminium m 4.400 80,000.00
Profil kaca m 4.500 10,000.00
Sealant Tube 0.270 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.2.1.14.Pemasangan 1 m2 venetions blinds dan Vertical blinds


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.350 54,000.00
Tukang L.03 OH 0.350 68,000.00
Kepala tukang L.03 OH 0.035 69,000.00
Mandor L.04 OH 0.018 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. Venetions blinds dan vertical blinds m2 1.000 125,000.00
(tirai)
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.2.1.15. Pemasangan 1 m2 terali besi strip (2 x 3) mm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.670 54,000.00
Tukang Las L.03 OH 1.670 66,000.00
Kepala tukang L.03 OH 0.167 69,000.00
Mandor L.04 OH 0.083 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi strip kg 6.177 12,650.00
Pengelasan cm 27.080 4,702.50
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

40
A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.100 54,000.00
Tukang L.03 OH 0.100 68,000.00
Kepala tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kawat nyamuk m2 1.100 35,000.00
Pengelasan cm 11.11 4,702.50
Baja strip (0,2 x 2) cm kg 1.716 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.200 54,000.00
Tukang L.03 OH 0.200 68,000.00
Kepala tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.001 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Jendela nako (rangka + kaca 5 mm) m2 1.100 37,500.00
Paku skrup 1 cm – 2,5 cm buah 10.000 500.00
Besi strip m 7.000 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.200 54,000.00
Tukang L.03 OH 0.200 68,000.00
Kepala tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.001 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng plat m 1.050 38,500.00
Paku 1 cm - 2,5 cm kg 0.015 20,000.00
Papan kayu kelas II atau III m3 0.019 6,400,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

41
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.150 54,000.00
Tukang L.03 OH 0.300 68,000.00
Kepala tukang L.03 OH 0.030 69,000.00
Mandor L.04 OH 0.008 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng plat m 1.050 38,500.00
Paku 1 cm – 2,5 cm kg 0.010 20,000.00
Besi strip kg 0.500 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.2.1.20.Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.250 54,000.00
Tukang Besi L.02 OH 0.250 68,000.00
Kepala Tukang L.03 OH 0.025 69,000.00
Mandor L.04 OH 0.013 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal hollow 40.40 M1 3.500 34,125
Assesoris (perkuatan, las dll) Ls 1 50,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.350 54,000.00
Tukang Besi L.02 OH 0.350 68,000.00
Kepala Tukang L.03 OH 0.035 69,000.00
Mandor L.04 OH 0.018 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal hollow 40.40 M1 4.000 39,000
Assesoris (perkuatan, las dll) Ls 1 50,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

42
Jumlah
Harga
(Rp)

3,240.00
3,960.00
414.00
213.00
7,827.00

15,870.00
15,870.00

0.00

23,697.00
2,369.70
26,066.70

Jumlah
Harga
(Rp)

3,240.00
3,960.00
414.00
213.00
7,827.00

15,870.00
15,870.00

0.00

23,697.00
2,369.70
26,066.70

Jumlah
Harga
(Rp)

5,400.00
6,800.00
69.00
355.00
12,624.00

13,000.00
3,500.00
16,500.00

36,000.00
36,000.00

65,124.00
6,512.40
71,636.40

43
Jumlah
Harga
(Rp)

56,700.00
69,300.00
7,245.00
3,692.00
136,937.00

207,000.00
414,920.00
3,250.00
625,170.00

0.00

762,107.00
76,210.70
838,317.70

Jumlah
Harga
(Rp)

2,160.00
1,360.00
138.00
142.00
3,800.00

26,000.00
3,900.00
1,400.00
31,300.00

7,650.00
7,650.00

42,750.00
4,275.00
47,025.00

Jumlah
Harga
(Rp)

23,760.00
29,920.00
3,036.00
1,562.00
58,278.00

385,000.00
385,000.00

0.00

443,278.00
44,327.80

44
487,605.80

45
Jumlah
Harga
(Rp)

54,000.00
68,000.00
6,900.00
3,550.00
132,450.00

525,000.00
525,000.00

0.00

657,450.00
65,745.00
723,195.00

Jumlah
Harga
(Rp)

2,322.00
2,924.00
296.70
149.10
5,691.80

88,000.00
1,500.00
4,500.00
94,000.00

0.00

99,691.80
9,969.18
109,660.98

Jumlah
Harga
(Rp)

4,590.00
5,780.00
586.50
298.20
11,254.70

352,000.00
131,400.00
483,400.00

0.00

494,654.70
49,465.47
544,120.17

46
Jumlah
Harga
(Rp)

4,590.00
5,780.00
621.00
355.00
11,346.00

352,000.00
45,000.00
20,250.00
417,250.00

0.00

428,596.00
42,859.60
471,455.60

Jumlah
Harga
(Rp)

18,900.00
23,800.00
2,415.00
1,278.00
46,393.00

125,000.00

125,000.00

0.00

171,393.00
17,139.30
188,532.30

Jumlah
Harga
(Rp)

90,180.00
110,220.00
11,523.00
5,893.00
217,816.00

78,139.05
127,343.70
205,482.75

0.00

423,298.75
42,329.88
465,628.63

47
Jumlah
Harga
(Rp)

5,400.00
6,800.00
690.00
355.00
13,245.00

38,500.00
52,244.78
21,707.40
112,452.18

0.00

125,697.18
12,569.72
138,266.89

Jumlah
Harga
(Rp)

10,800.00
13,600.00
1,380.00
71.00
25,851.00

41,250.00
5,000.00
88,550.00
134,800.00

0.00

160,651.00
16,065.10
176,716.10

Jumlah
Harga
(Rp)

10,800.00
13,600.00
1,380.00
71.00
25,851.00

40,425.00
300.00
121,600.00
162,325.00

0.00

188,176.00
18,817.60
206,993.60

48
Jumlah
Harga
(Rp)

8,100.00
20,400.00
2,070.00
568.00
31,138.00

40,425.00
200.00
6,325.00
46,950.00

0.00

78,088.00
7,808.80
85,896.80

Jumlah
Harga
(Rp)

13,500.00
17,000.00
1,725.00
923.00
33,148.00

119,437.50
50,000.00
169,437.50

0.00

202,585.50
20,258.55
222,844.05

Jumlah
Harga
(Rp)

18,900.00
23,800.00
2,415.00
1,278.00
46,393.00

156,000.00
50,000.00
206,000.00

0.00

252,393.00
25,239.30
277,632.30

49
D. PEKERJAAN DINDING

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.600 54,000.00
Tukang Batu L.02 OH 0.200 66,000.00
Kepala Tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.030 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 140.000 750.00
Semen Portlan Kg 43.5 1,200.00
Pasir Pasang m3 0.08 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.600 54,000.00
Tukang Batu L.02 OH 0.200 66,000.00
Kepala Tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.030 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 140.000 750.00
Semen Portlan Kg 32.950 1,200.00
Pasir Pasang m3 0.091 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.600 54,000.00
Tukang Batu L.02 OH 0.200 66,000.00
Kepala Tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.030 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 140.000 750.00
Semen Portlan Kg 26.550 1,200.00
Pasir Pasang m3 0.093 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

42
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

43
A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.600 54,000.00
Tukang Batu L.02 OH 0.200 66,000.00
Kepala Tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.030 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 140.000 750.00
Semen Portlan Kg 22.200 1,200.00
Pasir Pasang m3 0.102 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.600 54,000
Tukang Batu L.02 OH 0.200 66,000
Kepala Tukang L.03 OH 0.020 69,000
Mandor L.04 OH 0.030 71,000
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 140.000 750.00
Semen Portlan Kg 18.500 1,200.00
Pasir Pasang m3 0.122 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.600 54,000.00
Tukang Batu L.02 OH 0.200 66,000.00
Kepala Tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.030 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 140.000 750.00
Semen Portlan Kg 10.080 1,200.00
Kapur Padam m3 0.0275 270,000.00
Pasir Pasang m3 0.0925 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

44
A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.02 OH 0.100 66,000.00
Kepala Tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 750.00
Semen Portlan Kg 18.950 1,200.00
Pasir Pasang m3 0.038 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.02 OH 0.100 66,000.00
Kepala Tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 750.00
Semen Portlan Kg 14.370 1,200.00
Pasir Pasang m3 0.040 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.02 OH 0.100 66,000.00
Kepala Tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 750.00
Semen Portlan Kg 11.500 1,200.00
Pasir Pasang m3 0.043 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

45
A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :5PP

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.02 OH 0.100 66,000.00
Kepala Tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 750.00
Semen Portlan Kg 9.680 1,200.00
Pasir Pasang m3 0.045 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.02 OH 0.100 66,000.00
Kepala Tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 750.00
Semen Portland Kg 8.320 1,200.00
Pasir Pasang m3 0.049 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.02 OH 0.100 66,000.00
Kepala Tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 750.00
Semen Portland Kg 6.500 1,200.00
Pasir Pasang m3 0.050 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

46
A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.02 OH 0.100 66,000.00
Kepala Tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 750.00
Semen Portlan Kg 4.500 1,200.00
Kapur Padam m3 0.015 270,000.00
Pasir Pasang m3 0.050 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.02 OH 0.100 66,000.00
Kepala Tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 750.00
Semen Merah Kg 0.018 14,000.00
Kapur Padam m3 0.018 270,000.00
Pasir Pasang m3 0.018 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.02 OH 0.100 66,000.00
Kepala Tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 750.00
Semen Merah Kg 0.014 14,000.00
Kapur Padam m3 0.014 270,000.00
Pasir Pasang m3 0.028 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

47
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

48
A. 4.4.1.20 Pemasangan 1 m2 dinding conblock HB10 campuran 1SP : 3PP

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.02 OH 0.100 66,000.00
Kepala Tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bataco bh 12.500 5,000.00
Semen Portland Kg 15.160 1,200.00
Pasir Pasang m3 0.364 240,000.00
Besi angker dia 8 Kg 0.280 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.02 OH 0.100 66,000.00
Kepala Tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bataco bh 12.500 5,000.00
Semen Portland Kg 12.130 1,200.00
Pasir Pasang m3 0.388 240,000.00
Besi angker dia 8 Kg 0.280 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. 4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.02 OH 0.100 66,000.00
Kepala Tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata rooster bh 30.000 12,000.00
Semen Portland Kg 11.000 1,200.00
Pasir Pasang m3 0.035 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

49
A. 4.4.1.23 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.02 OH 0.100 66,000.00
Kepala Tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata berongga bh 30.000 12,000.00
Semen Portland Kg 11.000 1,200.00
Pasir Pasang m3 0.035 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A. 4.4.1.24 Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.02 OH 0.150 66,000.00
Kepala Tukang L.03 OH 0.015 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata berongga bh 70.000 12,000.00
Semen Portland Kg 14.000 1,200.00
Pasir Pasang m3 0.032 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

50
Jumlah
Harga
(Rp)

32,400.00
13,200.00
1,380.00
2,130.00
49,110.00

105,000.00
52,200.00
19,200.00
176,400.00

0.00

225,510.00
22,551.00
248,061.00

Jumlah
Harga
(Rp)

32,400.00
13,200.00
1,380.00
2,130.00
49,110.00

105,000.00
39,540.00
21,840.00
166,380.00

0.00

215,490.00
21,549.00
237,039.00

Jumlah
Harga
(Rp)

32,400.00
13,200.00
1,380.00
2,130.00
49,110.00

105,000.00
31,860.00
22,320.00
159,180.00

0.00

208,290.00

51
20,829.00
229,119.00

52
Jumlah
Harga
(Rp)

32,400.00
13,200.00
1,380.00
2,130.00
49,110.00

105,000.00
26,640.00
24,480.00
156,120.00

0.00

205,230.00
20,523.00
225,753.00

Jumlah
Harga
(Rp)

32,400.00
13,200.00
1,380.00
2,130.00
49,110.00

105,000.00
22,200.00
29,280.00
156,480.00

0.00

205,590.00
20,559.00
226,149.00

g bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP


Jumlah
Harga
(Rp)

32,400.00
13,200.00
1,380.00
2,130.00
49,110.00

105,000.00
12,096.00
7,425.00
22,200.00
146,721.00

0.00

195,831.00
19,583.10
215,414.10

53
g bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
Jumlah
Harga
(Rp)

16,200.00
6,600.00
690.00
1,065.00
24,555.00

52,500.00
22,740.00
9,120.00
84,360.00

0.00

108,915.00
10,891.50
119,806.50

ng bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP


Jumlah
Harga
(Rp)

16,200.00
6,600.00
690.00
1,065.00
24,555.00

52,500.00
17,244.00
9,600.00
79,344.00

0.00

103,899.00
10,389.90
114,288.90

Jumlah
Harga
(Rp)

16,200.00
6,600.00
690.00
1,065.00
24,555.00

52,500.00
13,800.00
10,320.00
76,620.00

0.00

101,175.00
10,117.50
111,292.50

54
Jumlah
Harga
(Rp)

16,200.00
6,600.00
690.00
1,065.00
24,555.00

52,500.00
11,616.00
10,800.00
74,916.00

0.00

99,471.00
9,947.10
109,418.10

Jumlah
Harga
(Rp)

16,200.00
6,600.00
690.00
1,065.00
24,555.00

52,500.00
9,984.00
11,760.00
74,244.00

0.00

98,799.00
9,879.90
108,678.90

Jumlah
Harga
(Rp)

16,200.00
6,600.00
690.00
1,065.00
24,555.00

52,500.00
7,800.00
12,000.00
72,300.00

0.00

96,855.00
9,685.50
106,540.50

55
ng bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP

Jumlah
Harga
(Rp)

16,200.00
6,600.00
690.00
1,065.00
24,555.00

52,500.00
5,400.00
4,050.00
12,000.00
73,950.00

0.00

98,505.00
9,850.50
108,355.50

ng bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP


Jumlah
Harga
(Rp)

16,200.00
6,600.00
690.00
1,065.00
24,555.00

52,500.00
252.00
4,860.00
4,320.00
61,932.00

0.00

86,487.00
8,648.70
95,135.70

ng bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP


Jumlah
Harga
(Rp)

16,200.00
6,600.00
690.00
1,065.00
24,555.00

52,500.00
196.00
3,780.00
6,720.00
63,196.00

0.00

87,751.00

56
8,775.10
96,526.10

57
ng conblock HB10 campuran 1SP : 3PP

Jumlah
Harga
(Rp)

16,200.00
6,600.00
690.00
1,065.00
24,555.00

62,500.00
18,192.00
87,360.00
3,542.00
171,594.00

0.00

196,149.00
19,614.90
215,763.90

Jumlah
Harga
(Rp)

16,200.00
6,600.00
690.00
1,065.00
24,555.00

62,500.00
14,556.00
93,120.00
3,542.00
173,718.00

0.00

198,273.00
19,827.30
218,100.30

Jumlah
Harga
(Rp)

16,200.00
6,600.00
690.00
1,065.00
24,555.00

360,000.00
13,200.00
8,400.00
381,600.00

0.00

406,155.00
40,615.50
446,770.50

58
Jumlah
Harga
(Rp)

16,200.00
6,600.00
690.00
1,065.00
24,555.00

360,000.00
13,200.00
8,400.00
381,600.00

0.00

406,155.00
40,615.50
446,770.50

Jumlah
Harga
(Rp)

16,200.00
9,900.00
1,035.00
1,065.00
28,200.00

840,000.00
16,800.00
7,680.00
864,480.00

0.00

892,680.00
89,268.00
981,948.00

59
E. PEKERJAAN PLESTERAN :

A.4.4.2 HARGA
A.4.4.2.1. SATUAN1PEKERJAAN
Pemasangan PLESTERAN
m2 plesteran 1SP : 1PP tebal 15 mm.

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.03 OH 0.150 66,000.00
Kepala Tukang L.03 OH 0.015 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 15.504 1,200.00
2. PP m3 0.016 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. 36168.528
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm.


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.03 OH 0.150 66,000.00
Kepala Tukang L.03 OH 0.015 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 10.224 1,200.00
2. PP m3 0.020 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.03 OH 0.150 66,000.00
Kepala Tukang L.03 OH 0.015 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 7.776 1,200.00
2. PP m3 0.023 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

49
A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.03 OH 0.150 66,000.00
Kepala Tukang L.03 OH 0.015 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 6.240 1,200.00
2. PP m3 0.024 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.03 OH 0.150 66,000.00
Kepala Tukang L.03 OH 0.015 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 5.184 1,200.00
2. PP m3 0.026 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm.

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.03 OH 0.150 66,000.00
Kepala Tukang L.03 OH 0.015 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 4.416 1,200.00
2. PP m3 0.027 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

50
A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.03 OH 0.150 66,000.00
Kepala Tukang L.03 OH 0.015 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 3.936 1,200.00
2. PP m3 0.028 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.03 OH 0.150 66,000.00
Kepala Tukang L.03 OH 0.015 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 3.456 1,200.00
2. PP m3 0.029 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.360 54,000.00
Tukang Batu L.03 OH 0.120 66,000.00
Kepala Tukang L.03 OH 0.012 69,000.00
Mandor L.04 OH 0.018 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 5.760 1,200.00
2. KP m3 0.003 270,000.00
3. PP m3 0.013 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

51
A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.360 54,000.00
Tukang Batu L.03 OH 0.120 66,000.00
Kepala Tukang L.03 OH 0.012 69,000.00
Mandor L.04 OH 0.018 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 3.000 1,200.00
2. KP m3 0.005 270,000.00
3. PP m3 0.020 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.360 54,000.00
Tukang Batu L.03 OH 0.120 66,000.00
Kepala Tukang L.03 OH 0.012 69,000.00
Mandor L.04 OH 0.018 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. SM m3 0.009 185,000.00
2. KP m3 0.009 270,000.00
3. PP m3 0.009 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.360 54,000.00
Tukang Batu L.03 OH 0.120 66,000.00
Kepala Tukang L.03 OH 0.012 69,000.00
Mandor L.04 OH 0.018 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. SM m3 0.007 185,000.00
2. KP m3 0.007 270,000.00
3. PP m3 0.015 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

52
A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.400 54,000.00
Tukang Batu L.03 OH 0.200 66,000.00
Kepala Tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.022 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 13.632 1,200.00
2. PP m3 0.027 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.260 54,000.00
Tukang Batu L.03 OH 0.200 66,000.00
Kepala Tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.013 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 10.368 1,200.00
2. PP m3 0.031 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm.


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.400 54,000.00
Tukang Batu L.03 OH 0.200 66,000.00
Kepala Tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.022 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 8.320 1,200.00
2. PP m3 0.032 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

53
A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.400 54,000.00
Tukang Batu L.03 OH 0.200 66,000.00
Kepala Tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.022 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 6.912 1,200.00
2. PP m3 0.035 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.400 54,000.00
Tukang Batu L.03 OH 0.200 66,000.00
Kepala Tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.022 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 5.888 1,200.00
2. PP m3 0.036 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga
A.4.4.2.18. Satuan Pekerjaan
Pemasangan (D+E) 1SM : 1KP : 2PP tebal 20 mm
1 m2 plesteran

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.440 54,000.00
Tukang Batu L.03 OH 0.220 66,000.00
Kepala Tukang L.03 OH 0.022 69,000.00
Mandor L.04 OH 0.022 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. SM m3 0.009 185,000.00
2. KP m3 0.009 270,000.00
3. PP m3 0.018 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

54
A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.150 54,000.00
Tukang Batu L.03 OH 0.075 66,000.00
Kepala Tukang L.03 OH 0.008 69,000.00
Mandor L.04 OH 0.008 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 5.184 1,200.00
PP m3 0.026 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.080 54,000.00
Tukang Batu L.03 OH 0.400 66,000.00
Kepala Tukang L.03 OH 0.040 69,000.00
Mandor L.04 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 0.500 1,200.00
Pasir pasang m3 0.013 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.03 OH 0.100 66,000.00
Kepala Tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 4.320 1,200.00
Pasir pasang Kg 0.006 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

55
A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.150 54,000.00
Tukang Batu L.03 OH 0.075 66,000.00
Kepala Tukang L.03 OH 0.008 69,000.00
Mandor L.04 OH 0.008 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.108 1,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.070 54,000.00
Tukang Batu L.03 OH 0.035 66,000.00
Kepala Tukang L.03 OH 0.004 69,000.00
Mandor L.04 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 1.600 1,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.300 54,000.00
Tukang Batu L.03 OH 0.150 66,000.00
Kepala Tukang L.03 OH 0.015 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 6.340 1,200.00
Pasir pasang m3 0.012 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

56
A.4.4.2.27. Pemasangan 1 m2 acian.
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.200 54,000.00
Tukang Batu L.03 OH 0.100 66,000.00
Kepala Tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.010 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.250 1,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

57
Jumlah
Harga
(Rp)

16,200.00
9,900.00
1,035.00
1,065.00
28,200.00

18,604.80
3,840.00
22,444.80

0.00

50,644.80
5,064.48
55,709.28

Jumlah
Harga
(Rp)

16,200.00
9,900.00
1,035.00
1,065.00
28,200.00

12,268.80
4,800.00
17,068.80

0.00

45,268.80
4,526.88
49,795.68

Jumlah
Harga
(Rp)

16,200.00
9,900.00
1,035.00
1,065.00
28,200.00

9,331.20
5,520.00
14,851.20

0.00

43,051.20
4,305.12
47,356.32

58
Jumlah
Harga
(Rp)

16,200.00
9,900.00
1,035.00
1,065.00
28,200.00

7,488.00
5,760.00
13,248.00

0.00

41,448.00
4,144.80
45,592.80

Jumlah
Harga
(Rp)

16,200.00
9,900.00
1,035.00
1,065.00
28,200.00

6,220.80
6,240.00
12,460.80

0.00

40,660.80
4,066.08
44,726.88

Jumlah
Harga
(Rp)

16,200.00
9,900.00
1,035.00
1,065.00
28,200.00

5,299.20
6,480.00
11,779.20

0.00

39,979.20
3,997.92
43,977.12

59
Jumlah
Harga
(Rp)

16,200.00
9,900.00
1,035.00
1,065.00
28,200.00

4,723.20
6,720.00
11,443.20

0.00

39,643.20
3,964.32
43,607.52

Jumlah
Harga
(Rp)

16,200.00
9,900.00
1,035.00
1,065.00
28,200.00

4,147.20
6,960.00
11,107.20

0.00

39,307.20
3,930.72
43,237.92

Jumlah
Harga
(Rp)

19,440.00
7,920.00
828.00
1,278.00
29,466.00

6,912.00
810.00
3,120.00
10,842.00

0.00

40,308.00
4,030.80
44,338.80

60
Jumlah
Harga
(Rp)

19,440.00
7,920.00
828.00
1,278.00
29,466.00

3,600.00
1,350.00
4,800.00
9,750.00

0.00

39,216.00
3,921.60
43,137.60

Jumlah
Harga
(Rp)

19,440.00
7,920.00
828.00
1,278.00
29,466.00

1,665.00
2,430.00
2,160.00
6,255.00

0.00

35,721.00
3,572.10
39,293.10

Jumlah
Harga
(Rp)

19,440.00
7,920.00
828.00
1,278.00
29,466.00

1,295.00
1,890.00
3,600.00
6,785.00

0.00

36,251.00
3,625.10
39,876.10

61
Jumlah
Harga
(Rp)

21,600.00
13,200.00
1,380.00
1,562.00
37,742.00

16,358.40
6,480.00
22,838.40

0.00

60,580.40
6,058.04
66,638.44

Jumlah
Harga
(Rp)

14,040.00
13,200.00
1,380.00
923.00
29,543.00

12,441.60
7,440.00
19,881.60

0.00

49,424.60
4,942.46
54,367.06

Jumlah
Harga
(Rp)

21,600.00
13,200.00
1,380.00
1,562.00
37,742.00

9,984.00
7,680.00
17,664.00

0.00

55,406.00
5,540.60
60,946.60

62
Jumlah
Harga
(Rp)

21,600.00
13,200.00
1,380.00
1,562.00
37,742.00

8,294.40
8,400.00
16,694.40

0.00

54,436.40
5,443.64
59,880.04

Jumlah
Harga
(Rp)

21,600.00
13,200.00
1,380.00
1,562.00
37,742.000

7,065.60
8,640.00
15,705.60

0.00

53,447.60
5,344.76
58,792.36

Jumlah
Harga
(Rp)

23,760.00
14,520.00
1,518.00
1,562.00
41,360.00

1,665.00
2,430.00
4,320.00
8,415.00

0.00

49,775.00
4,977.50
54,752.50

63
Jumlah
Harga
(Rp)

8,100.00
4,950.00
552.00
568.00
14,170.00

6,220.80
6,240.00
12460.80

0.00

26,630.80
2,663.08
29,293.88

Jumlah
Harga
(Rp)

4,320.00
26,400.00
2,760.00
284.00
33,764.00

600.00
3,120.00
3,720.00

0.00

37,484.00
3,748.40
41,232.40

Jumlah
Harga
(Rp)

16,200.00
6,600.00
690.00
1,065.00
24,555.00

5,184.00
1,440.00
6,624.00

0.00

31,179.00
3,117.90
34,296.90

64
Jumlah
Harga
(Rp)

8,100.00
4,950.00
552.00
568.00
14,170.00

3,729.60
3,729.60

0.00

17,899.60
1,789.96
19,689.56

Jumlah
Harga
(Rp)

3,780.00
2,310.00
276.00
284.00
6,650.00

1,920.00
1,920.00

0.00

8,570.00
857.00
9,427.00

Jumlah
Harga
(Rp)

16,200.00
9,900.00
1,035.00
1,065.00
28,200.00

7,608.00
2,880.00
10,488.00

0.00

38,688.00
3,868.80
42,556.80

65
Jumlah
Harga
(Rp)

10,800.00
6,600.00
690.00
710.00
18,800.00

3,900.00
3,900.00

0.00

22,700.00
2,270.00
24,970.00

66
M. PEKERJAAN PENUTUP LANTAI DAN DINDING

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.2.Pemasangan 1m2 lantai ubin PC abu-abu ukuran 30cm x30 cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.250 54,000.00
Tukang Batu L.02 OH 0.125 66,000.00
Kepala tukang L.03 OH 0.013 69,000.00
Mandor L.04 OH 0.013 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin abu-abu Bh 11.87 7,650.00
Semen Portlan kg 10.00 1,200.00
Pasir pasang M3 0.045 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.270 54,000.00
Tukang Batu L.02 OH 0.135 66,000.00
Kepala tukang L.03 OH 0.014 69,000.00
Mandor L.04 OH 0.014 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin abu-abu Bh 26.50 3,000.00
Semen Portlan kg 10.40 1,200.00
Pasir pasang M3 0.045 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.5.Pemasangan 1m2 lantai ubin PC warna ukuran 30cm x30cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.260 54,000.00
Tukang Batu L.02 OH 0.13 66,000.00
Kepala tukang L.03 OH 0.013
JUMLAH 69,000.00
Mandor L.04 OH 0.013
TENAGA 71,000.00
KERJA
B BAHAN
Ubin warna Bh 11.87 9,000.00
Semen Portlan kg 10.00 1,200.00
Semen warna Kg 1.50 14,000.00
Pasir pasang M3 0.045
JUMLAH 240,000.00
HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

58
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

59
A.4.4.3.6.Pemasangan 1m2 lantai PC ubin warna ukuran 20cm x20cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.270 54,000.00
Tukang Batu L.02 OH 0.135 66,000.00
Kepala tukang L.03 OH 0.014 69,000.00
Mandor L.04 OH 0.014 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin warna Bh 26.50 3,600.00
Semen Portlan kg 10.40 1,200.00
Semen warna Kg 1.62 14,000.00
Pasir pasang M3 0.045 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.9.Pemasangan 1m2 lantai ubin granit ukuran 40cm x40cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.250 54,000.00
Tukang Batu L.02 OH 0.125 66,000.00
Kepala tukang L.03 OH 0.013 69,000.00
Mandor L.04 OH 0.013 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin granit Bh 6.63 40,000.00
Semen Portlan kg 9.80 1,200.00
Semen warna Kg 1.30 14,000.00
Pasir pasang M3 0.045 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.3.10.Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.260 54,000.00
Tukang Batu L.02 OH 0.13 66,000.00
Kepala tukang L.03 OH 0.013 69,000.00
Mandor L.04 OH 0.013 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin granit Bh 11.87 24,750.00
Semen Portlan kg 10.00 1,200.00
Semen warna Kg 1.50 14,000.00
Pasir pasang M3 0.045 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

60
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

61
A.4.4.3.11.Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.250 54,000.00
Tukang Batu L.02 OH 0.125 66,000.00
Kepala tukang L.03 OH 0.013 69,000.00
Mandor L.04 OH 0.013 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux Bh 6.63 38,200.00
Semen Portlan kg 9.80 1,200.00
Semen warna Kg 1.30 14,000.00
Pasir pasang M3 0.045 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.13.Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.24 54,000.00
Tukang Batu L.02 OH 0.12 66,000.00
Kepala tukang L.03 OH 0.012 69,000.00
Mandor L.04 OH 0.012 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux marmer Bh 3.10 95,400.00
Semen Portlan kg 9.60 1,200.00
Semen warna Kg 1.50 14,000.00
Pasir pasang M3 0.045 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan
A.4.4.3.16.Pemasangan 1 m’ plint(D+E)
ubin Pc abu-abu ukuran 10cm x 20cm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.09 54,000.00
Tukang Batu L.02 OH 0.09 66,000.00
Kepala tukang L.03 OH 0.009 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 5.30 8,000.00
Semen Portland kg 1.65 1,200.00
Pasir pasang M3 0.004
JUMLAH 240,000.00
HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D

62
F. Harga Satuan Pekerjaan (D+E)

63
A.4.4.3.17.Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 30cm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.09 54,000.00
Tukang Batu L.02 OH 0.09 66,000.00
Kepala tukang L.03 OH 0.009 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 3.53 10,000.00
Semen Portland kg 1.24 1,200.00
Pasir pasang M3 0.003 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.19.Pemasangan 1 m’ plint ubin warna ukuran 10cm x 20cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.09 54,000.00
Tukang Batu L.02 OH 0.09 66,000.00
Kepala tukang L.03 OH 0.009 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 2.65 8,500.00
Semen Portlan kg 1.14 1,200.00
Semen warna Kg 0.10 14,000.00
Pasir pasang M3 0.003 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.3.20.Pemasangan 1 m’ plint ubin warna ukuran 10cm x 30cm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.09 54,000.00
Tukang Batu L.02 OH 0.09 66,000.00
Kepala tukang L.03 OH 0.009 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 3.53 10,500.00
Semen Portlan kg 1.14 1,200.00
Semen warna Kg 0.10 14,000.00
Pasir pasang M3 0.003 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

64
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

65
A.4.4.3.21.Pemasangan 1 m’ plint ubin warna ukuran 10cm x 40cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.09 54,000.00
Tukang Batu L.02 OH 0.09 66,000.00
Kepala tukang L.03 OH 0.009 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 2.65 20,000.00
Semen Portlan kg 1.14 1,200.00
Semen warna Kg 0.10 14,000.00
Pasir pasang M3 0.003 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.32.Pemasangan 1m2 lantai keramik ukuran 10 cm x 20 cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.70 54,000
Tukang Batu L.02 OH 0.35 66,000
Kepala tukang L.03 OH 0.035 69,000
Mandor L.04 OH 0.035 71,000
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 53.00 2,650.00
Semen Portland Kg 8.19 1,200.00
Pasir pasang M3 0.045 240,000.00
Semen warna Kg 2.75 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.34.Pemasangan 1m2 lantai keramik ukuran 33cm x 33cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.70 54,000
Tukang Batu L.02 OH 0.35 66,000
Kepala tukang L.03 OH 0.035 69,000
Mandor L.04 OH 0.035 71,000
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik doos 1.05 122,000.00
Semen Portland Kg 8.19 1,200.00
Pasir pasang M3 0.045 240,000.00
Semen warna Kg 0.5 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

66
A.4.4.3.35.Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.70 54,000
Tukang Batu L.02 OH 0.35 66,000
Kepala tukang L.03 OH 0.035 69,000
Mandor L.04 OH 0.035 71,000
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik doos 1.05 50,000.00
Semen Portland Kg 10.00 1,200.00
Pasir pasang M3 0.045 240,000.00
Semen warna Kg 0.5 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.36.Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.70 54,000
Tukang Batu L.02 OH 0.35 66,000
Kepala tukang L.03 OH 0.035 69,000
Mandor L.04 OH 0.035 71,000
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik doos 1.05 52,000.00
Semen Portlan Kg 10.40 1,200.00
Pasir pasang M3 0.045 240,000.00
Semen warna Kg 0.5 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.37.Pemasangan 1m2 lantai keramik ukuran 10cm x 33cm untuk variasi/border


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.05 54,000
Tukang Batu L.02 OH 0.525 66,000
Kepala tukang L.03 OH 0.053 69,000
Mandor L.04 OH 0.053 71,000
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 33.00 5,200
Semen Portlan Kg 9.80 1,200
Pasir pasang M3 0.045 240,000
Semen warna Kg 4.37 14,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

67
A.4.4.3.39.Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.09 54,000
Tukang Batu L.02 OH 0.09 66,000
Kepala tukang L.03 OH 0.035 69,000
Mandor L.04 OH 0.005 71,000
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 5.30 2,650.00
Semen Portlan Kg 1.14 1,200.00
Pasir pasang M3 0.003 240,000.00
Semen warna Kg 0.025 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.40.Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.09 54,000
Tukang Batu L.02 OH 0.09 66,000
Kepala tukang L.03 OH 0.035 69,000
Mandor L.04 OH 0.005 71,000
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 10.60 5,250
Semen Portland Kg 1.14 1,200
Pasir pasang M3 0.003 240,000
Semen warna Kg 0.05 14,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.41.Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.09 54,000
Tukang Batu L.02 OH 0.09 66,000
Kepala tukang L.03 OH 0.035 69,000
Mandor L.04 OH 0.005 71,000
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 5.30 5,200
Semen Portland Kg 0.57 1,200
Pasir pasang M3 0.0015 240,000
Semen warna Kg 0.013 14,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

68
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

69
A.4.4.3.43.Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.70 54,000
Tukang Batu L.02 OH 0.35 66,000
Kepala tukang L.03 OH 0.035 69,000
Mandor L.04 OH 0.035 71,000
JUMLAH TENAGA KERJA
B BAHAN
Marmer Bh 1.06 480,000.00
Semen Portlan Kg 8.19 1,200.00
Pasir pasang M3 0.045 240,000.00
Semen warna Kg 0.134 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.44.Pemasangan 1 m2 lantai karpet


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.17 54,000
Tukang Kayu L.02 OH 0.17 68,000
Kepala tukang L.03 OH 0.017 69,000
Mandor L.04 OH 0.009 71,000
JUMLAH TENAGA KERJA
B BAHAN
Karpet m2 1.05 127,500.00
Lem Kg 0.35 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.46.Pemasangan 1 m2 lantai parquet kayu jati


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.70 54,000
Tukang Kayu L.02 OH 0.35 68,000
Kepala tukang L.03 OH 0.035 69,000
Mandor L.04 OH 0.035 71,000
JUMLAH TENAGA KERJA
B BAHAN
Parquet m2 1.05 240,000.00
Lem Kg 0.60 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

70
A.4.4.3.48.Pemasangan 1 m2 dinding porselen 11 x 11 cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.90 54,000
Tukang Batu L.02 OH 0.45 66,000
Kepala tukang L.03 OH 0.045 69,000
Mandor L.04 OH 0.045 71,000
JUMLAH TENAGA KERJA
B BAHAN
Porselen doos 1.05 41,000.00
Semen Portlan Kg 9.30 1,200.00
Pasir Pasang M3 0.018 240,000.00
Semen warna Kg 0.5 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.51.Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.90 54,000
Tukang Batu L.02 OH 0.45 66,000
Kepala tukang L.03 OH 0.045 69,000
Mandor L.04 OH 0.045 71,000
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik Bh 53.00 20,000.00
Semen Portlan Kg 9.30 1,200.00
Pasir Pasang M3 0.018 240,000.00
Semen warna Kg 2.75 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.52.Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.90 54,000
Tukang Batu L.02 OH 0.45 66,000
Kepala tukang L.03 OH 0.045 69,000
Mandor L.04 OH 0.045 71,000
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik Bh 106.00 15,000.00
Semen Portlan Kg 9.30 1,200.00
Pasir Pasang M3 0.018 240,000.00
Semen warna Kg 2.90 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

71
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

72
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.90 54,000
Tukang Batu L.02 OH 0.45 66,000
Kepala tukang L.03 OH 0.045 69,000
Mandor L.04 OH 0.045 71,000
JUMLAH TENAGA KERJA
B BAHAN
Keramik Bh 53.00 2,650
Semen Portlan Kg 9.30 1,200
Pasir Pasang M3 0.018 240,000
Semen warna Kg 2.75 14,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.90 54,000
Tukang Batu L.02 OH 0.45 66,000
Kepala tukang L.03 OH 0.045 69,000
Mandor L.04 OH 0.045 71,000
JUMLAH TENAGA KERJA
B BAHAN
Keramik Bh 26.50 2,080.00
Semen Portlan Kg 9.30 1,200.00
Pasir Pasang M3 0.018 240,000.00
Semen warna Kg 1.94 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

73
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.30 54,000
Tukang Batu L.02 OH 0.65 66,000
Kepala tukang L.03 OH 0.065 69,000
Mandor L.04 OH 0.065 71,000
JUMLAH TENAGA KERJA
B BAHAN
Marmer Bh 1.06 480,000.00
Semen Portlan Kg 12.44 1,200.00
Pasir Pasang M3 0.025 240,000.00
Semen warna Kg 0.65 14,000.00
Paku 12cm Bh 3.03 500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.00 54,000
Tukang Batu L.02 OH 0.50 66,000
Kepala tukang L.03 OH 0.05 69,000
Mandor L.04 OH 0.05 71,000
JUMLAH TENAGA KERJA
B BAHAN
Bata pelapis Bh 63.00 750.00
Semen Portlan Kg 12.44 1,200.00
Pasir Pasang M3 0.025 240,000.00
Semen warna Kg 2.75 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.70 54,000
Tukang Batu L.02 OH 0.35 66,000
Kepala tukang L.03 OH 0.035 69,000
Mandor L.04 OH 0.035 71,000
JUMLAH TENAGA KERJA
B BAHAN
Batu paras Bh 1.10 110,000.00
Semen Portlan Kg 11.75 1,200.00
Pasir Pasang M3 0.035 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D

74
F. Harga Satuan Pekerjaan (D+E)

75
A.4.4.3.58.Pemasangan 1 m2 dinding batu tempel hitam
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.70 54,000
Tukang Batu L.02 OH 0.35 66,000
Kepala tukang L.03 OH 0.035 69,000
Mandor L.04 OH 0.035 71,000
JUMLAH TENAGA KERJA
B BAHAN
Batu temple hitam Bh 1.10 92,500.00
Semen Portlan Kg 11.75 1,200.00
Pasir Pasang M3 0.035 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.3.59.Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.15 54,000
Tukang Batu L.02 OH 0.15 66,000
Kepala tukang L.03 OH 0.015 69,000
Mandor L.04 OH 0.008 71,000
JUMLAH TENAGA KERJA
B BAHAN
Vynil Bh 11.87 24,000
Lem Kg 0.35 25,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.60.Pemasangan 1 m2 wallpaper lebar 50 cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.35 54,000
Tukang Batu L.02 OH 0.175 66,000
Kepala tukang L.03 OH 0.017 69,000
Mandor L.04 OH 0.002 71,000
JUMLAH TENAGA KERJA
B BAHAN
Wallpaper m 2.20 50,000
Lem Kg 0.25 25,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

76
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.08 54,000
Tukang Batu L.02 OH 0.08 66,000
Kepala tukang L.03 OH 0.008 69,000
Mandor L.04 OH 0.004 71,000
JUMLAH TENAGA KERJA
B BAHAN
Vynil Bh 1.76 15,000
Lem Kg 0.08 25,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.12 54,000
Tukang Batu L.02 OH 0.12 66,000
Kepala tukang L.03 OH 0.012 69,000
Mandor L.04 OH 0.006 71,000
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas II M3 0.003 10,250,000
Paku/skrup 5cm Kg 0.05 750
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

77
PENUTUP LANTAI DAN PENUTUP DINDING

Jumlah
Harga
(Rp)

13,500.00
8,250.00
897.00
923.00
23,570.00

90,805.50
12,000.00
10,800.00
113,605.50

137,175.50
13,717.55
150,893.05

Jumlah
Harga
(Rp)

14,580.00
8,910.00
966.00
994.00
25,450.00

79,500.00
12,480.00
10,800.00
102,780.00

-
128,230.00
12,823.00
141,053.00

Jumlah
Harga
(Rp)

14,040.00
8,580.00
897.00
923.00
24,440.00

106,830.00
12,000.00
21,000.00
10,800.00
150,630.00

175,070.00

78
17,507.00
192,577.00

79
Jumlah
Harga
(Rp)

14,580.00
8,910.00
966.00
994.00
25,450.00

95,400.00
12,480.00
22,680.00
10,800.00
141,360.00

166,810.00
16,681.00
183,491.00

Jumlah
Harga
(Rp)

13,500.00
8,250.00
897.00
923.00
23,570.00

265,200.00
11,760.00
18,200.00
10,800.00
305,960.00

329,530.00
32,953.00
362,483.00

Jumlah
Harga
(Rp)

14,040.00
8,580.00
897.00
923.00
24,440.00

293,782.50
12,000.00
21,000.00
10,800.00
337,582.50

80
362,022.50
36,202.25
398,224.75

81
Jumlah
Harga
(Rp)

13,500.00
8,250.00
897.00
923.00
23,570.00

253,266.00
11,760.00
18,200.00
10,800.00
294,026.00

317,596.00
31,759.60
349,355.60

Jumlah
Harga
(Rp)

12,960.00
7,920.00
828.00
852.00
22,560.00

295,740.00
11,520.00
21,000.00
10,800.00
339,060.00

361,620.00
36,162.00
397,782.00

Jumlah
Harga
(Rp)

4,860.00
5,940.00
621.00
355.00
11,776.00

42,400.00
1,980.00
960.00
45,340.00

57,116.00
5,711.60

82
62,827.60

83
Jumlah
Harga
(Rp)

4,860.00
5,940.00
621.00
355.00
11,776.00

35,300.00
1,488.00
720.00
37,508.00

49,284.00
4,928.40
54,212.40

Jumlah
Harga
(Rp)

4,860.00
5,940.00
621.00
355.00
11,776.00

22,525.00
1,368.00
1,400.00
720.00
26,013.00

37,789.00
3,778.90
41,567.90

Jumlah
Harga
(Rp)

4,860.00
5,940.00
621.00
355.00
11,776.00

37,065.00
1,368.00
1,400.00
720.00
40,553.00

52,329.00

84
5,232.90
57,561.90

85
Jumlah
Harga
(Rp)

4,860.00
5,940.00
621.00
355.00
11,776.00

53,000.00
1,368.00
1,400.00
720.00
56,488.00

68,264.00
6,826.40
75,090.40

Jumlah
Harga
(Rp)

37,800.00
23,100.00
2,415.00
2,485.00
65,800.00

140,450.00
9,828.00
10,800.00
38,500.00
199,578.00

265,378.00
26,537.80
291,915.80

Jumlah
Harga
(Rp)

37,800.00
23,100.00
2,415.00
2,485.00
65,800.00

128,100.00
9,828.00
10,800.00
7,000.00
155,728.00

221,528.00
22,152.80
243,680.80

86
Jumlah
Harga
(Rp)

37,800.00
23,100.00
2,415.00
2,485.00
65,800.00

52,500.00
12,000.00
10,800.00
7,000.00
82,300.00

148,100.00
14,810.00
162,910.00

Jumlah
Harga
(Rp)

37,800.00
23,100.00
2,415.00
2,485.00
65,800.00

54,600.00
12,480.00
10,800.00
7,000.00
84,880.00

150,680.00
15,068.00
165,748.00

Jumlah
Harga
(Rp)

56,700.00
34,650.00
3,657.00
3,763.00
98,770.00

171,600.00
11,760.00
10,800.00
61,180.00
255,340.00

354,110.00
35,411.00
389,521.00

87
Jumlah
Harga
(Rp)

4,860.00
5,940.00
2,415.00
355.00
13,570.00

14,045.00
1,368.00
720.00
350.00
16,483.00

30,053.00
3,005.30
33,058.30

Jumlah
Harga
(Rp)

4,860.00
5,940.00
2,415.00
355.00
13,570.00

55,650.00
1,368.00
720.00
700.00
58,438.00

72,008.00
7,200.80
79,208.80

Jumlah
Harga
(Rp)

4,860.00
5,940.00
2,415.00
355.00
13,570.00

27,560.00
684.00
360.00
182.00
28,786.00

42,356.00

88
4,235.60
46,591.60

89
Jumlah
Harga
(Rp)

37,800.00
23,100.00
2,415.00
2,485.00
65,800.00

508,800.00
9,828.00
10,800.00
1,876.00
531,304.00

597,104.00
59,710.40
656,814.40

Jumlah
Harga
(Rp)

9,180.00
11,560.00
1,173.00
639.00
22,552.00

133,875.00
8,750.00
142,625.00

165,177.00
16,517.70
181,694.70

Jumlah
Harga
(Rp)

37,800.00
23,800.00
2,415.00
2,485.00
66,500.00

252,000.00
15,000.00
267,000.00

333,500.00
33,350.00
366,850.00

90
Jumlah
Harga
(Rp)

48,600.00
29,700.00
3,105.00
3,195.00
84,600.00

43,050.00
11,160.00
4,320.00
7,000.00
65,530.00

150,130.00
15,013.00
165,143.00

Jumlah
Harga
(Rp)

48,600.00
29,700.00
3,105.00
3,195.00
84,600.00

1,060,000.00
11,160.00
4,320.00
38,500.00
1,113,980.00

1,198,580.00
119,858.00
1,318,438.00

Jumlah
Harga
(Rp)

48,600.00
29,700.00
3,105.00
3,195.00
84,600.00

1,590,000.00
11,160.00
4,320.00
40,600.00
1,646,080.00

1,730,680.00

91
173,068.00
1,903,748.00

92
Jumlah
Harga
(Rp)

48,600.00
29,700.00
3,105.00
3,195.00
84,600.00

140,450.00
11,160.00
4,320.00
38,500.00
194,430.00

279,030.00
27,903.00
306,933.00

Jumlah
Harga
(Rp)

48,600.00
29,700.00
3,105.00
3,195.00
84,600.00

55,120.00
11,160.00
4,320.00
27,160.00
97,760.00

182,360.00
18,236.00
200,596.00

93
Jumlah
Harga
(Rp)

70,200.00
42,900.00
4,485.00
4,615.00
122,200.00

508,800.00
14,928.00
6,000.00
9,100.00
1,515.00
540,343.00

662,543.00
66,254.30
728,797.30

Jumlah
Harga
(Rp)

54,000.00
33,000.00
3,450.00
3,550.00
94,000.00

47,250.00
14,928.00
6,000.00
38,500.00
106,678.00

200,678.00
20,067.80
220,745.80

Jumlah
Harga
(Rp)

37,800.00
23,100.00
2,415.00
2,485.00
65,800.00

121,000.00
14,100.00
8,400.00
143,500.00

209,300.00
20,930.00

94
230,230.00

95
Jumlah
Harga
(Rp)

37,800.00
23,100.00
2,415.00
2,485.00
65,800.00

101,750.00
14,100.00
8,400.00
124,250.00

190,050.00
19,005.00
209,055.00

Jumlah
Harga
(Rp)

8,100.00
9,900.00
1,035.00
568.00
19,603.00

284,880.00
8,750.00
293,630.00

313,233.00
31,323.30
344,556.30

Jumlah
Harga
(Rp)

18,900.00
11,550.00
1,173.00
142.00
31,765.00

110,000.00
6,250.00
116,250.00

148,015.00
14,801.50
162,816.50

96
Jumlah
Harga
(Rp)

4,320.00
5,280.00
552.00
284.00
10,436.00

26,400.00
2,000.00
28,400.00

38,836.00
3,883.60
42,719.60

Jumlah
Harga
(Rp)

6,480.00
7,920.00
828.00
426.00
15,654.00

30,750.00
37.50
30,787.50

46,441.50
4,644.15
51,085.65

97
I PEKERJAAN LANGIT-LANGIT

A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.030 54,000.00
Tukang kayu L.02 OH 0.070 68,000.00
Kepala tukang L.03 OH 0.007 69,000.00
Mandor L.04 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes semen m2 1.100 20,000.00
Paku tripleks kg 0.010 21,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.120 54,000.00
Tukang kayu L.02 OH 0.120 68,000.00
Kepala tukang L.03 OH 0.012 69,000.00
Mandor L.04 OH 0.006 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 12 20,000.00
Paku tripleks kg 0.050 21,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.120 54,000.00
Tukang kayu L.02 OH 0.120 68,000.00
Kepala tukang L.03 OH 0.012 69,000.00
Mandor L.04 OH 0.006 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 5.800 25,000.00
Paku tripleks kg 0.050 21,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

71
A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.100 54,000.00
Tukang kayu L.02 OH 0.100 68,000.00
Kepala tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 1.500 38,000.00
Paku tripleks kg 0.050 21,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.100 54,000.00
Tukang kayu L.02 OH 0.100 68,000.00
Kepala tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Tripleks 9 (3 mm) Lembar 0.375 50,700.00
Paku tripleks kg 0.030 21,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.800 54,000.00
Tukang kayu L.02 OH 0.800 68,000.00
Kepala tukang L.03 OH 0.080 69,000.00
Mandor L.04 OH 0.040 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu papan (Bangkirai) m3 0.015 14,000,000.00
Paku tripleks kg 0.010 21,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

72
A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.100 54,000.00
Tukang kayu L.02 OH 0.050 68,000.00
Kepala tukang L.03 OH 0.005 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Gypsum board Lembar 0.364 75,000.00
Paku skrup kg 0.110 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.500 54,000.00
Tukang Besi L.02 OH 0.500 68,000.00
Kepala tukang L.03 OH 0.050 69,000.00
Mandor L.04 OH 0.025 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Profil Allum"T" m 3.600 8,500.00
Kawat dia 4 mm kg 0.150 16,000.00
Ramset Buah 1.050 22,000.00
Akustik60 x 120 Lembar 1.500 38,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.050 54,000.00
Tukang Kayu L.02 OH 0.050 68,000.00
Kepala tukang L.03 OH 0.005 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
List kayu profil m 1.050 9,000.00
Paku kg 0.010 21,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

73
Jumlah
Harga
(Rp)

1,620.00
4,760.00
483.00
284.00
7,147.00

22,000.00
210.00
22,210.00

0.00

29,357.00
2,935.70
32,292.70

Jumlah
Harga
(Rp)

6,480.00
8,160.00
828.00
426.00
15,894.00

240,000.00
1,050.00
241,050.00

0.00

256,944.00
25,694.40
282,638.40

Jumlah
Harga
(Rp)

6,480.00
8,160.00
828.00
426.00
15,894.00

145,000.00
1,050.00
146,050.00

0.00

161,944.00
16,194.40
178,138.40

74
Jumlah
Harga
(Rp)

5,400.00
6,800.00
690.00
355.00
13,245.00

57,000.00
1,050.00
58,050.00

0.00

71,295.00
7,129.50
78,424.50

langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm


Jumlah
Harga
(Rp)

5,400.00
6,800.00
690.00
355.00
13,245.00

19,012.50
630.00
19,642.50

0.00

32,887.50
3,288.75
36,176.25

Jumlah
Harga
(Rp)

43,200.00
54,400.00
5,520.00
2,840.00
105,960.00

210,000.00
210.00
210,210.00

0.00

316,170.00
31,617.00
347,787.00

75
Jumlah
Harga
(Rp)

5,400.00
3,400.00
345.00
355.00
9,500.00

27,300.00
1,650.00
28,950.00

0.00

38,450.00
3,845.00
42,295.00

Jumlah
Harga
(Rp)

27,000.00
34,000.00
3,450.00
1,775.00
66,225.00

30,600.00
2,400.00
23,100.00
57,000.00
113,100.00

0.00

179,325.00
17,932.50
197,257.50

Jumlah
Harga
(Rp)

2,700.00
3,400.00
345.00
213.00
6,658.00

9,450.00
210.00
9,660.00

0.00

16,318.00
1,631.80
17,949.80

76
H. PEKERJAAN PENUTUP ATAP

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP

A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.15 54,000.00
Tukang Kayu L.03 OH 0.075 68,000.00
Kepala tukang L.11 OH 0.0075 69,000.00
Mandor L.15 OH 0.008 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng palentong Bh 25.00 3,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.15 54,000
Tukang Kayu L.03 OH 0.075 68,000
Kepala tukang L.11 OH 0.008 69,000
Mandor L.15 OH 0.008 71,000
JUMLAH TENAGA KERJA
B BAHAN
Genteng kodok Bh 25.00 5,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.15 54,000.00
Tukang Kayu L.03 OH 0.075 68,000.00
Kepala tukang L.11 OH 0.008 69,000.00
Mandor L.15 OH 0.008 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Palentong besar Bh 12.00 4,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

74
A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong kecil
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.40 54,000.00
Tukang Kayu L.03 OH 0.20 68,000.00
Kepala tukang L.11 OH 0.02 69,000.00
Mandor L.15 OH 0.002 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung Bh 5.00 7,500.00
Semen Portlan Kg 8.00 1,200.00
Pasir pasang M3 0.032 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.40 54,000.00
Tukang Kayu L.03 OH 0.20 68,000.00
Kepala tukang L.11 OH 0.02 69,000.00
Mandor L.15 OH 0.002 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung Bh 5.00 8,500.00
Semen Portlan Kg 8.00 1,200.00
Pasir pasang M3 0.032 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.6. Pemasangan 1 m’ bubung genteng plentong besar

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.40 54,000.00
Tukang Kayu L.03 OH 0.20 68,000.00
Kepala tukang L.11 OH 0.02 69,000.00
Mandor L.15 OH 0.002 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung Bh 4.00 8,500.00
Semen Portlan Kg 8.00 1,200.00
Pasir pasang M3 0.032 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

75
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

76
A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,5m x 5mm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.140 54,000.00
Tukang Kayu L.03 OH 0.075 68,000.00
Kepala tukang L.11 OH 0.008 69,000.00
Mandor L.15 OH 0.008 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.50 125,000.00
Paku pancing 6x23 Kg 0.12 31,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.14 54,000.00
Tukang Kayu L.03 OH 0.075 68,000.00
Kepala tukang L.11 OH 0.008 69,000.00
Mandor L.15 OH 0.008 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.60 125,000.00
Paku pancing 6x23 Kg 0.12 31,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,00m x 5mm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.14 54,000.00
Tukang Kayu L.03 OH 0.070 68,000.00
Kepala tukang L.11 OH 0.007 69,000.00
Mandor L.15 OH 0.007 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.60 125,000.00
Paku pancing 6x23 Kg 0.12 31,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

77
A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.14 54,000.00
Tukang Kayu L.03 OH 0.070 68,000.00
Kepala tukang L.11 OH 0.007 69,000.00
Mandor L.15 OH 0.007 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.75 125,000.00
Paku pancing 6x23 Kg 0.12 31,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.14 54,000.00
Tukang Kayu L.03 OH 0.070 68,000.00
Kepala tukang L.11 OH 0.007 69,000.00
Mandor L.15 OH 0.007 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.35 125,000.00
Paku pancing 6x23 Kg 0.12 31,600.00

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.14 54,000.00
Tukang Kayu L.03 OH 0.070 68,000.00
Kepala tukang L.11 OH 0.007 69,000.00
Mandor L.15 OH 0.007 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.42 125,000.00
Paku pancing 6x23 Kg 0.12 31,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

78
A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.14 54,000.00
Tukang Kayu L.03 OH 0.070 68,000.00
Kepala tukang L.11 OH 0.007 69,000.00
Mandor L.15 OH 0.007 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.44 125,000.00
Paku pancing 6x23 Kg 0.12 31,600.00

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.10m x 4mm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.14 54,000.00
Tukang Kayu L.03 OH 0.070 68,000.00
Kepala tukang L.11 OH 0.007 69,000.00
Mandor L.15 OH 0.007 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.51 125,000.00
Paku pancing 6x23 Kg 0.12 31,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.14 54,000.00
Tukang Kayu L.03 OH 0.070 68,000.00
Kepala tukang L.11 OH 0.007 69,000.00
Mandor L.15 OH 0.007 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.80 125,000.00
Paku pancing 6x23 Kg 0.12 31,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

79
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.14 54,000.00
Tukang Kayu L.03 OH 0.070 68,000.00
Kepala tukang L.11 OH 0.007 69,000.00
Mandor L.15 OH 0.007 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.37 125,000.00
Paku pancing 6x23 Kg 0.12 31,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.14 54,000.00
Tukang Kayu L.03 OH 0.070 68,000.00
Kepala tukang L.11 OH 0.007 69,000.00
Mandor L.15 OH 0.007 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.38 125,000.00
Paku pancing 6x23 Kg 0.12 31,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.14 54,000.00
Tukang Kayu L.03 OH 0.070 68,000.00
Kepala tukang L.11 OH 0.007 69,000.00
Mandor L.15 OH 0.007 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.46 125,000.00
Paku pancing 6x23 Kg 0.12 31,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

80
A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.14 54,000.00
Tukang Kayu L.03 OH 0.070 68,000.00
Kepala tukang L.11 OH 0.007 69,000.00
Mandor L.15 OH 0.007 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.49 125,000.00
Paku pancing 6x23 Kg 0.12 31,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.14 54,000.00
Tukang Kayu L.03 OH 0.070 68,000.00
Kepala tukang L.11 OH 0.007 69,000.00
Mandor L.15 OH 0.007 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.57 125,000.00
Paku pancing 6x23 Kg 0.12 31,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92m


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.084 54,000.00
Tukang Kayu L.03 OH 0.125 68,000.00
Kepala tukang L.11 OH 0.013 69,000.00
Mandor L.15 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.40 58,000.00
Paku skrup 3,5” Bh 6.00 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

81
A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05m
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.084 54,000.00
Tukang Kayu L.03 OH 0.125 68,000.00
Kepala tukang L.11 OH 0.013 69,000.00
Mandor L.15 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.1 58,000.00
Paku skrup 3,5” Bh 6.00 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga
A.4.5.2.24. Satuan Pekerjaan
Pemasangan (D+E)
1 m’ bubung stel gelombang 1,08m

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.084 54,000.00
Tukang Kayu L.03 OH 0.125 68,000.00
Kepala tukang L.11 OH 0.013 69,000.00
Mandor L.15 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.05 58,000.00
Paku skrup 3,5” Bh 6.00 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92m

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.084 54,000.00
Tukang Kayu L.03 OH 0.125 68,000.00
Kepala tukang L.11 OH 0.013 69,000.00
Mandor L.15 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.20 75,000.00
Paku skrup 3,5” Bh 6.00 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

82
A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05m
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.084 54,000.00
Tukang Kayu L.03 OH 0.125 68,000.00
Kepala tukang L.11 OH 0.013 69,000.00
Mandor L.15 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.20 75,000.00
Paku skrup 3,5” Bh 6.00 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.084 54,000.00
Tukang Kayu L.03 OH 0.125 68,000.00
Kepala tukang L.11 OH 0.013 69,000.00
Mandor L.15 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.20 75,000.00
Paku skrup 3,5” Bh 6.00 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92m


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.10 54,000.00
Tukang Kayu L.03 OH 0.15 68,000.00
Kepala tukang L.11 OH 0.013 69,000.00
Mandor L.15 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.10 75,000.00
Paku skrup 3,5” Bh 6.00 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

83
A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05m
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.084 54,000.00
Tukang Kayu L.03 OH 0.125 68,000.00
Kepala tukang L.11 OH 0.013 69,000.00
Mandor L.15 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.10 75,000.00
Paku skrup 3,5” Bh 6.00 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.30. Pemasangan 1 m2 genteng beton


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.200 54,000.00
Tukang Kayu L.03 OH 0.100 68,000.00
Kepala tukang L.11 OH 0.010 69,000.00
Mandor L.15 OH 0.010 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng beton Bh 11.00 9,500.00
Paku biasa 2”-5” Kg 0.03 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.200 54,000.00
Tukang Kayu L.03 OH 0.100 68,000.00
Kepala tukang L.11 OH 0.010 69,000.00
Mandor L.15 OH 0.001 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng metal m2 1.30 229,500.00
Paku biasa ½”-1” Kg 0.20 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

84
A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.200 54,000.00
Tukang Kayu L.03 OH 0.100 68,000.00
Kepala tukang L.11 OH 0.010 69,000.00
Mandor L.15 OH 0.001 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng metal m2 2.00 229,500.00
Paku biasa ½”-1” Kg 0.20 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.166 54,000.00
Tukang Kayu L.03 OH 0.250 68,000.00
Kepala tukang L.11 OH 0.025 69,000.00
Mandor L.15 OH 0.008 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sirap kayu Bh 30.00 2,100.00
Paku biasa ½”-1” Kg 0.20 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.34. Pemasangan 1 m’ nok genteng beton


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.400 54,000.00
Tukang Kayu L.03 OH 0.200 68,000.00
Kepala tukang L.11 OH 0.020 69,000.00
Mandor L.15 OH 0.020 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng beton Bh 3.50 19,000.00
Paku biasa ½”-1” Kg 0.05 20,000.00
Semen PC Kg 10.80 1,200.00
Pasir pasang M3 0.032 240,000.00
Semen warna Kg 1.00 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

85
A.4.5.2.36. Pemasangan 1 m’ nok genteng metal
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.250 54,000
Tukang Kayu L.03 OH 0.150 68,000
Kepala tukang L.11 OH 0.015 69,000
Mandor L.15 OH 0.013 71,000
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng metal Bh 1.10 45,000.00
Paku biasa ½”-1” Kg 0.05 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.37. Pemasangan 1 m’ nok sirap


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.125 54,000.00
Tukang Kayu L.03 OH 0.250 68,000.00
Kepala tukang L.11 OH 0.025 69,000.00
Mandor L.15 OH 0.006 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng plat 3 x 6” Lbr 0.40 38,500.00
Paku biasa ½”-1” Kg 0.05 21,000.00
Paku biasa 2”-5” Kg 0.05 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.5.2.38. Pemasangan 1 m2 atap seng gelombang


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.120 54,000.00
Tukang Kayu L.03 OH 0.06 68,000.00
Kepala tukang L.11 OH 0.006 69,000.00
Mandor L.15 OH 0.006 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng gel 3”x6” Lbr 0.70 38,500.00
Paku biasa ½”-1” Kg 0.02 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

86
A.4.5.2.39. Pemasangan 1 m’nok atap seng
Harga Satuan
(Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.150 54,000.00
Tukang Kayu L.03 OH 0.07 68,000.00
Kepala tukang L.11 OH 0.007 69,000.00
Mandor L.15 OH 0.006 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng plat 3”x6” bjls 28 Lbr 0.30 38,500.00
Paku biasa ½”-1” Kg 0.04 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

87
Jumlah
Harga
(Rp)

8,100.00
5,100.00
517.50
568.00
14,285.50

75,000.00
75,000.00

0.00

89,285.50
8,928.55
98,214.05

Jumlah
Harga
(Rp)

8,100.00
5,100.00
552.00
568.00
14,320.00

125,000.00
125,000.00

0.00

139,320.00
13,932.00
153,252.00

Jumlah
Harga
(Rp)

8,100.00
5,100.00
552.00
568.00
14,320.00

54,000.00
54,000.00

0.00

68,320.00
6,832.00
75,152.00

88
Jumlah
Harga
(Rp)

21,600.00
13,600.00
1,380.00
142.00
36,722.00

37,500.00
9,600.00
7,680.00
54,780.00

0.00

91,502.00
9,150.20
100,652.20

Jumlah
Harga
(Rp)

21,600.00
13,600.00
1,380.00
142.00
36,722.00

42,500.00
9,600.00
7,680.00
59,780.00

0.00

96,502.00
9,650.20
106,152.20

Jumlah
Harga
(Rp)

21,600.00
13,600.00
1,380.00
142.00
36,722.00

34,000.00
9,600.00
7,680.00
51,280.00

0.00

88,002.00

89
8,800.20
96,802.20

90
Jumlah
Harga
(Rp)

7,560.00
5,100.00
552.00
568.00
13,780.00

62,500.00
3,792.00
66,292.00

0.00

80,072.00
8,007.20
88,079.20

Jumlah
Harga
(Rp)

7,560.00
5,100.00
552.00
568.00
13,780.00

75,000.00
3,792.00
78,792.00

0.00

92,572.00
9,257.20
101,829.20

Jumlah
Harga
(Rp)

7,560.00
4,760.00
483.00
497.00
13,300.00

75,000.00
3,792.00
78,792.00

0.00

92,092.00
9,209.20
101,301.20

91
Jumlah
Harga
(Rp)

7,560.00
4,760.00
483.00
497.00
13,300.00

93,750.00
3,792.00
97,542.00

0.00

110,842.00
11,084.20
121,926.20

Jumlah
Harga
(Rp)

7,560.00
4,760.00
483.00
497.00
13,300.00

43,750.00
3,792.00

47,542.00

0.00

60,842.00
6,084.20
66,926.20

Jumlah
Harga
(Rp)

7,560.00
4,760.00
483.00
497.00
13,300.00

52,500.00
3,792.00
56,292.00

0.00

69,592.00
6,959.20
76,551.20

92
Jumlah
Harga
(Rp)

7,560.00
4,760.00
483.00
497.00
13,300.00

55,000.00
3,792.00

58,792.00

0.00

72,092.00
7,209.20
79,301.20

Jumlah
Harga
(Rp)

7,560.00
4,760.00
483.00
497.00
13,300.00

63,750.00
3,792.00
67,542.00

0.00

80,842.00
8,084.20
88,926.20

Jumlah
Harga
(Rp)

7,560.00
4,760.00
483.00
497.00
13,300.00

100,000.00
3,792.00
103,792.00

0.00

117,092.00
11,709.20
128,801.20

93
Jumlah
Harga
(Rp)

7,560.00
4,760.00
483.00
497.00
13,300.00

46,250.00
3,792.00
50,042.00

0.00

63,342.00
6,334.20
69,676.20

Jumlah
Harga
(Rp)

7,560.00
4,760.00
483.00
497.00
13,300.00

47,500.00
3,792.00
51,292.00

0.00

64,592.00
6,459.20
71,051.20

Jumlah
Harga
(Rp)

7,560.00
4,760.00
483.00
497.00
13,300.00

57,500.00
3,792.00
61,292.00

0.00

74,592.00
7,459.20
82,051.20

94
Jumlah
Harga
(Rp)

7,560.00
4,760.00
483.00
497.00
13,300.00

61,250.00
3,792.00
65,042.00

0.00

78,342.00
7,834.20
86,176.20

Jumlah
Harga
(Rp)

7,560.00
4,760.00
483.00
497.00
13,300.00

71,250.00
3,792.00
75,042.00

0.00

88,342.00
8,834.20
97,176.20

Jumlah
Harga
(Rp)

4,536.00
8,500.00
897.00
284.00
14,217.00

139,200.00
103,200.00
242,400.00

0.00

256,617.00
25,661.70
282,278.70

95
Jumlah
Harga
(Rp)

4,536.00
8,500.00
897.00
284.00
14,217.00

121,800.00
90,000.00
211,800.00

0.00

226,017.00
22,601.70
248,618.70

Jumlah
Harga
(Rp)

4,536.00
8,500.00
897.00
284.00
14,217.00

118,900.00
90,000.00
208,900.00

0.00

223,117.00
22,311.70
245,428.70

Jumlah
Harga
(Rp)

4,536.00
8,500.00
897.00
284.00
14,217.00

90,000.00
90,000.00
180,000.00

0.00

194,217.00
19,421.70
213,638.70

96
Jumlah
Harga
(Rp)

4,536.00
8,500.00
897.00
284.00
14,217.00

90,000.00
90,000.00
180,000.00

0.00

194,217.00
19,421.70
213,638.70

Jumlah
Harga
(Rp)

4,536.00
8,500.00
897.00
284.00
14,217.00

90,000.00
90,000.00
180,000.00

0.00

194,217.00
19,421.70
213,638.70

Jumlah
Harga
(Rp)

5,400.00
10,200.00
897.00
284.00
16,781.00

82,500.00
90,000.00
172,500.00

0.00

189,281.00
18,928.10
208,209.10

97
Jumlah
Harga
(Rp)

4,536.00
8,500.00
897.00
284.00
14,217.00

82,500.00
90,000.00
172,500.00

0.00

186,717.00
18,671.70
205,388.70

Jumlah
Harga
(Rp)

10,800.00
6,800.00
690.00
710.00
19,000.00

104,500.00
600.00
105,100.00

0.00

124,100.00
12,410.00
136,510.00

Jumlah
Harga
(Rp)

10,800.00
6,800.00
690.00
71.00
18,361.00

298,350.00
3,440.00
301,790.00

0.00

320,151.00
32,015.10
352,166.10

98
Jumlah
Harga
(Rp)

10,800.00
6,800.00
690.00
71.00
18,361.00

459,000.00
3,440.00
462,440.00

0.00

480,801.00
48,080.10
528,881.10

Jumlah
Harga
(Rp)

8,964.00
17,000.00
1,725.00
568.00
28,257.00

63,000.00
4,000.00
67,000.00

0.00

95,257.00
9,525.70
104,782.70

Jumlah
Harga
(Rp)

21,600.00
13,600.00
1,380.00
1,420.00
38,000.00

66,500.00
1,000.00
12,960.00
7,680.00
14,000.00
102,140.00

0.00

140,140.00
14,014.00
154,154.00

99
Jumlah
Harga
(Rp)

13,500.00
10,200.00
1,035.00
923.00
25,658.00

49,500.00
1,000.00
50,500.00

0.00

76,158.00
7,615.80
83,773.80

Jumlah
Harga
(Rp)

6,750.00
17,000.00
1,725.00
426.00
25,901.00

15,400.00
1,050.00
1,000.00
17,450.00

0.00

43,351.00
4,335.10
47,686.10

Jumlah
Harga
(Rp)

6,480.00
4,080.00
414.00
426.00
11,400.00

26,950.00
400.00
27,350.00

0.00

38,750.00
3,875.00
42,625.00

100
Jumlah
Harga
(Rp)

8,100.00
4,760.00
483.00
426.00
13,769.00

11,550.00
800.00
12,350.00

0.00

26,119.00
2,611.90
28,730.90

101
F. PEKERJAAN KAYU :

A.4.6.1 HARGA
A.4.6.1.1. SATUAN
Pembuatan PEKERJAAN
dan KAYU
pemasangan 1 m3 kusen pintu dan kusen jendela, kayu Kelas I (Jati)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 7.000 54,000.00
Tukang kayu L.03 OH 21.000 68,000.00
Kepala tukang L.03 OH 2.100 69,000.00
Mandor L.04 OH 0.350 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu Jati m3 1.100 22,500,000.00
Paku 10 cm Kg 1.250 17,200.00
Lem kayu Kg 1.000 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II dan III (Kamfer)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 6.000 54,000.00
Tukang kayu L.03 OH 18.000 68,000.00
Kepala tukang L.03 OH 1.800 69,000.00
Mandor L.04 OH 0.300 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu Kamfer m3 1.200 9,100,000.00
Paku 10 cm Kg 1.250 17,200.00
Lem kayu Kg 1.000 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu Kelas II (Kamfer)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.350 54,000.00
Tukang kayu L.03 OH 1.050 68,000.00
Kepala tukang L.03 OH 0.105 69,000.00
Mandor L.04 OH 0.018 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Kamfer m3 0.040 10,250,000.00
Paku 5 – 7 cm Kg 0.050 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN

87
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

88
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu Kelas III (Meranti)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.350 54,000.00
Tukang kayu L.03 OH 1.050 68,000.00
Kepala tukang L.03 OH 0.105 69,000.00
Mandor L.04 OH 0.018 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Meranti m3 0.040 6,400,000.00
Paku 5 – 7 cm Kg 0.050 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II (Jati)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.000 54,000.00
Tukang kayu L.03 OH 3.000 68,000.00
Kepala tukang L.03 OH 0.300 69,000.00
Mandor L.04 OH 0.050 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Jati m3 0.040 25,000,000.00
Lem kayu Kg 0.500 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II (Jati)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.800 54,000.00
Tukang kayu L.03 OH 2.400 68,000.00
Kepala tukang L.03 OH 0.240 69,000.00
Mandor L.04 OH 0.040 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Jati m3 0.024 10,250,000.00
Lem kayu Kg 0.300 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

89
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kala I dan II (Jati)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.000 54,000.00
Tukang kayu L.03 OH 3.000 68,000.00
Kepala tukang L.03 OH 0.300 69,000.00
Mandor L.04 OH 0.050 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu jati m3 0.064 25,000,000.00
Lem kayu Kg 0.500 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II (Kamfer) (tertutup (lebar sam
cm)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.700 54,000.00
Tukang kayu L.03 OH 2.100 68,000.00
Kepala tukang L.03 OH 0.210 69,000.00
Mandor L.04 OH 0.035 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Kamfer m3 0.025 10,250,000.00
Paku 1 cm – 2,5 cm kg 0.030 20,000.00
Lem kayu kg 0.500 25,000.00
Plywood tebal 4 mm Ukuran (90 x 220) Lembar 1.000 62,700.00
cm JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II (Jati)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.800 54,000.00
Tukang kayu L.03 OH 2.400 68,000.00
Kepala tukang L.03 OH 0.240 69,000.00
Mandor L.04 OH 0.040 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Jati m3 0.0256 25,000,000.00
Paku 1 cm – 2,5 cm kg 0.030 17,200.00
Lem kayu kg 0.500 25,000.00
Plywood 4 mm (90 x 220) cm Lembar 1.000 62,700.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

90
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

91
A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II (Jati)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.670 54,000.00
Tukang kayu L.03 OH 2.000 68,000.00
Kepala tukang L.03 OH 0.200 69,000.00
Mandor L.04 OH 0.335 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Jati m3 0.060 25,000,000.00
Paku 1 – 2,5 cm kg 0.150 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I (Jati)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.800 54,000.00
Tukang kayu L.03 OH 2.400 68,000.00
Kepala tukang L.03 OH 0.240 69,000.00
Mandor L.04 OH 0.040 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu (Jati) m3 0.025 25,000,000.00
Paku 1 – 2,5 cm kg 0.030 20,000.00
Lem kayu kg 0.300 25,000.00
Teakwood 4 mm 90 x 220 cm Lembar 1.000 62,700.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II (Kamfer)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
1. Pekerja L.01 OH 0.850 54,000.00
2. Tukang kayu L.03 OH 2.550 68,000.00
3. Kepala tukang L.03 OH 0.255 69,000.00
4. Mandor L.04 OH 0.043 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Kamfer m3 0.025 10,250,000.00
Paku 1 – 2,5 cm kg 0.030 20,000.00
Lem kayu kg 0.800 25,000.00
Teakwood 4 mm 90 x 220 cm Lembar 1.000 62,700.00
Formika Lembar 0.500 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

92
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

93
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
(Bangkirai)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 4.000 54,000.00
Tukang kayu L.03 OH 12.000 68,000.00
Kepala tukang L.03 OH 1.200 69,000.00
Mandor L.04 OH 0.200 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu (Jati) m3 1.100 12,100,000.00
Besi strip tebal 5mm kg 15.000 12,650.00
Paku 12 cm kg 5.600 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I (Jati)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 6.700 54,000
Tukang kayu L.03 OH 20.100 68,000
Kepala tukang L.03 OH 2.010 69,000
Mandor L.04 OH 0.335 71,000
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu Jati m3 1.200 22,500,000.00
Besi strip tebal 5mm kg 15.000 12,650.00
Paku 12 cm kg 5.600 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II (Kruing)


Harga Satuan
(Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 6.700 54,000.00
Tukang kayu L.03 OH 20.100 68,000.00
Kepala tukang L.03 OH 2.010 69,000.00
Mandor L.04 OH 0.335 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu Kruing m3 1.100 6,900,000.00
Besi strip tebal 5 mm kg 15.000 12,650.00
Paku 12 cm kg 3.000 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

94
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

95
A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II (Kruing)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
1. Pekerja L.01 OH 0.100 54,000.00
2. Tukang kayu L.03 OH 0.100 68,000.00
3. Kepala tukang L.03 OH 0.010 69,000.00
4. Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7 cm (Kruing) m3 0.014 6,900,000.00
Reng 2 x 3 cm (Jati) m3 0.036 8,625,000.00
Paku 5 dan 10 cm kg 0.250 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II (Kruing)


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.100 54,000.00
Tukang kayu L.03 OH 0.100 68,000.00
Kepala tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm (Kruing) m3 0.014 6,900,000.00
Reng (3 x 4) cm (Kamfer) m3 0.057 9,100,000.00
Paku 5 dan 10 cm kg 0.250 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II (Kruing)


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.120 54,000.00
Tukang kayu L.03 OH 0.120 68,000.00
Kepala tukang L.03 OH 0.012 69,000.00
Mandor L.04 OH 0.006 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas II m3 0.014 6,900,000.00
Paku 5 - 10 cm m3 0.057 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

96
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III (Kruing)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.150 54,000.00
Tukang kayu L.03 OH 0.300 68,000.00
Kepala tukang L.03 OH 0.030 69,000.00
Mandor L.04 OH 0.075 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm (kruing) m3 0.0154 6,900,000.00
Paku 7 cm – 10 cm kg 0.200 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.20.Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III (Kruing)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.200 54,000.00
Tukang kayu L.03 OH 0.300 68,000.00
Kepala tukang L.03 OH 0.030 69,000.00
Mandor L.04 OH 0.010 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm (Kruing) m3 0.0163 6,900,000.00
Paku 7 – 10 cm kg 0.250 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II (Kamfer)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.100 54,000.00
Tukang kayu L.03 OH 0.200 68,000.00
Kepala tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu (kamfer) m3 0.0108 9,100,000.00
Paku 5 dan 7 cm kg 0.100 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

97
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II (Kamfer)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.100 54,000.00
Tukang kayu L.03 OH 0.200 68,000.00
Kepala tukang L.03 OH 0.020 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu (kamfer) m3 0.011 9,100,000.00
Paku 5 dan 7 cm kg 0.050 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III (Kruing)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.150 54,000.00
Tukang kayu L.03 OH 0.450 68,000.00
Kepala tukang L.03 OH 0.045 69,000.00
Mandor L.04 OH 0.008 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu (Kruing) m3 0.028 6,900,000.00
Paku 5 dan 7 cm kg 0.150 17,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.24. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II (Kruing)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.150 54,000
Tukang kayu L.03 OH 0.450 68,000
Kepala tukang L.03 OH 0.045 69,000
Mandor L.04 OH 0.008 71,000
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu, 6 x 12 (Kruing) m3 0.028 6,900,000.00
Paku 5 dan 10 kg 0.150 17,200.00
Teakwood 4 mm, 120 x 240 Lembar 0.860 62,700.00
Lem kayu kg 0.560 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

98
A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II (Kruing)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.200 54,000.00
Tukang kayu L.03 OH 0.600 68,000.00
Kepala tukang L.03 OH 0.060 69,000.00
Mandor L.04 OH 0.010 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu, 6 x 12 (Kruing) m3 0.028 6,900,000.00
Paku 5 dan 10 kg 0.150 25,000.00
Teakwood 4 mm, 120 x 240 Lembar 0.860 62,700.00
Lem kayu kg 0.560 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I (Jati)


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.600 54,000.00
Tukang kayu L.03 OH 1.800 68,000.00
Kepala tukang L.03 OH 0.180 69,000.00
Mandor L.04 OH 0.030 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Jati m3 0.007 25,000,000.00
Paku 5 dan 10 kg 0.100 17,200.00
Paku skrup 10 cm kg 0.150 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.025 54,000.00
Tukang kayu L.03 OH 0.075 68,000.00
Kepala tukang L.03 OH 0.008 69,000.00
Mandor L.04 OH 0.001 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plywood 4 mm m3 0.400 62,700.00
Paku 1 dan 2,5 kg 0.050 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

99
A.4.6.1.28. Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV (Meranti)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
1. Pekerja L.01 OH 0.100 54,000.00
2. Tukang kayu L.03 OH 0.050 68,000.00
3. Kepala tukang L.03 OH 0.005 69,000.00
4. Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bilik bambu m2 1.500 22,000.00
Kaso-kaso 5 x 7 (Meranti) m3 0.014 5,700,000.00
Paku kg 0.012 17,200.00
List kayu 2/4 m3 0.003 4,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

100
Jumlah
Harga
(Rp)

378,000.00
1,428,000.00
144,900.00
24,850.00
1,975,750.00

24,750,000.00
21,500.00
25,000.00
24,796,500.00

0.00

26,772,250.00
2,677,225.00
29,449,475.00

an 1 m3 kusen pintu dan kusen jendela, kayu kelas II dan III (Kamfer)
Jumlah
Harga
(Rp)

324,000.00
1,224,000.00
124,200.00
21,300.00
1,693,500.00

10,920,000.00
21,500.00
25,000.00
10,966,500.00

0.00

12,660,000.00
1,266,000.00
13,926,000.00

Jumlah
Harga
(Rp)

18,900.00
71,400.00
7,245.00
1,278.00
98,823.00

410,000.00
860.00
410,860.00

101
0.00

509,683.00
50,968.30
560,651.30

102
Jumlah
Harga
(Rp)

18,900.00
71,400.00
7,245.00
1,278.00
98,823.00

256,000.00
1,000.00
257,000.00

0.00

355,823.00
35,582.30
391,405.30

Jumlah
Harga
(Rp)

54,000.00
204,000.00
20,700.00
3,550.00
282,250.00

1,000,000.00
12,500.00
1,012,500.00

0.00

1,294,750.00
129,475.00
1,424,225.00

Jumlah
Harga
(Rp)

43,200.00
163,200.00
16,560.00
2,840.00
225,800.00

246,000.00
7,500.00
253,500.00

0.00

479,300.00
47,930.00
527,230.00

103
Jumlah
Harga
(Rp)

54,000.00
204,000.00
20,700.00
3,550.00
282,250.00

1,600,000.00
12,500.00
1,612,500.00

0.00

1,894,750.00
189,475.00
2,084,225.00

tu plywood rangkap, rangka kayu kelas II (Kamfer) (tertutup (lebar sampai 90

Jumlah
Harga
(Rp)

37,800.00
142,800.00
14,490.00
2,485.00
197,575.00

256,250.00
600.00
12,500.00
62,700.00
332,050.00

0.00

529,625.00
52,962.50
582,587.50

Jumlah
Harga
(Rp)

43,200.00
163,200.00
16,560.00
2,840.00
225,800.00

640,000.00
516.00
12,500.00
62,700.00
715,716.00

0.00

941,516.00

104
94,151.60
1,035,667.60

105
Jumlah
Harga
(Rp)

36,190.80
136,000.00
13,800.00
23,785.00
209,775.80

1,500,000.00
2,580.00
1,502,580.00

0.00

1,712,355.80
171,235.58
1,883,591.38

Jumlah
Harga
(Rp)

43,200.00
163,200.00
16,560.00
2,840.00
225,800.00

625,000.00
600.00
7,500.00
62,700.00
695,800.00

0.00

921,600.00
92,160.00
1,013,760.00

ood rangkap lapis formika, rangka expose kayu kelas II (Kamfer)


Jumlah
Harga
(Rp)

45,900.00
173,400.00
17,595.00
3,053.00
239,948.00

256,250.00
600.00
20,000.00
62,700.00
37,500.00
377,050.00

0.00

106
616,998.00
61,699.80
678,697.80

107
ruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter

Jumlah
Harga
(Rp)

216,000.00
816,000.00
82,800.00
14,200.00
1,129,000.00

13,310,000.00
189,750.00
96,320.00
13,596,070.00

0.00

14,725,070.00
1,472,507.00
16,197,577.00

Jumlah
Harga
(Rp)

361,800.00
1,366,800.00
138,690.00
23,785.00
1,891,075.00

27,000,000.00
189,750.00
96,320.00
27,286,070.00

0.00

29,177,145.00
2,917,714.50
32,094,859.50

Jumlah
Harga
(Rp)

361,800.00
1,366,800.00
138,690.00
23,785.00
1,891,075.00

7,590,000.00
189,750.00
51,600.00
7,831,350.00

0.00

9,722,425.00

108
972,242.50
10,694,667.50

109
Jumlah
Harga
(Rp)

5,400.00
6,800.00
690.00
355.00
13,245.00

96,600.00
310,500.00
4,300.00
411,400.00

0.00

424,645.00
42,464.50
467,109.50

Jumlah
Harga
(Rp)

5,400.00
6,800.00
690.00
355.00
13,245.00

96,600.00
518,700.00
4,300.00
619,600.00

0.00

632,845.00
63,284.50
696,129.50

Jumlah
Harga
(Rp)

6,480.00
8,160.00
828.00
426.00
15,894.00

96,600.00
980.40
97,580.40

0.00

113,474.40
11,347.44
124,821.84

110
Jumlah
Harga
(Rp)

8,100.00
20,400.00
2,070.00
5,325.00
35,895.00

106,260.00
3,440.00
109,700.00

0.00

145,595.00
14,559.50
160,154.50

Jumlah
Harga
(Rp)

10,800.00
20,400.00
2,070.00
710.00
33,980.00

112,470.00
4,300.00
116,770.00

0.00

150,750.00
15,075.00
165,825.00

nk ukuran (3 x 20) cm, kayu kelas I atau kelas II (Kamfer)


Jumlah
Harga
(Rp)

5,400.00
13,600.00
1,380.00
355.00
20,735.00

98,280.00
1,720.00
100,000.00

0.00

120,735.00
12,073.50
132,808.50

111
Jumlah
Harga
(Rp)

5,400.00
13,600.00
1,380.00
355.00
20,735.00

100,100.00
860.00
100,960.00

0.00

121,695.00
12,169.50
133,864.50

a dinding pemisah (60 x 120) cm kayu kelas II atau III (Kruing)


Jumlah
Harga
(Rp)

8,100.00
30,600.00
3,105.00
568.00
42,373.00

193,200.00
2,580.00
195,780.00

0.00

238,153.00
23,815.30
261,968.30

Jumlah
Harga
(Rp)

8,100.00
30,600.00
3,105.00
568.00
42,373.00

193,200.00
2,580.00
53,922.00
14,000.00
263,702.00

0.00

306,075.00
30,607.50
336,682.50

112
Jumlah
Harga
(Rp)

10,800.00
40,800.00
4,140.00
710.00
56,450.00

193,200.00
3,750.00
53,922.00
14,000.00
264,872.00

0.00

321,322.00
32,132.20
353,454.20

Jumlah
Harga
(Rp)

32,400.00
122,400.00
12,420.00
2,130.00
169,350.00

175,000.00
1,720.00
2,250.00
178,970.00

348,320.00
34,832.00
383,152.00

Jumlah
Harga
(Rp)

1,350.00
5,100.00
552.00
71.00
7,073.00

25,080.00
1,000.00
26,080.00

0.00

33,153.00
3,315.30
36,468.30

113
Jumlah
Harga
(Rp)

5,400.00
3,400.00
345.00
355.00
9,500.00

33,000.00
79,800.00
206.40
13.50
113,019.90

0.00

122,519.90
12,251.99
134,771.89

114
L. PEKERJAAN KUNCI DAN KACA :

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA KERJA
Pekerja L.01 OH 0.01 54,000.00
Tukang kayu L.02 OH 0.50 68,000.00
Kepala tukang L.03 OH 0.05 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam biasa Bh 1.00 80,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA KERJA
Pekerja L.01 OH 0.005 54,000.00
Tukang kayu L.02 OH 0.50 68,000.00
Kepala tukang L.03 OH 0.05 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam KM Bh 1.00 67,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.2.4. Pemasangan 1 buah kunci silinder


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA KERJA
Pekerja L.01 OH 0.005 54,000.00
Tukang kayu L.02 OH 0.50 68,000.00
Kepala tukang L.03 OH 0.05 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci silinder Bh 1.00 145,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

97
A.4.6.2.5. Pemasangan 1 buah engsel pintu

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.015 54,000.00
Tukang kayu L.02 OH 0.15 68,000.00
Kepala tukang L.03 OH 0.015 69,000.00
Mandor L.04 OH 0.0008 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel pintu Bh 1.00 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.01 54,000.00
Tukang kayu L.02 OH 0.10 68,000.00
Kepala tukang L.03 OH 0.010 69,000.00
Mandor L.04 OH 0.0005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel kupu-kupu Bh 1.00 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.2.7. Pemasangan 1 buah engsel angin


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.10 54,000.00
Tukang kayu L.02 0.20 68,000.00
Kepala tukang L.03 0.02 69,000.00
Mandor L.04 OH 0.0005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel angin Bh 1.00 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

98
A.4.6.2.9. Pemasangan 1 buah kait angin
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.015 54,000.00
Tukang kayu L.02 0.15 68,000.00
Kepala tukang L.03 0.015 69,000.00
Mandor L.04 OH 0.008 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kait angin Bh 1.00 16,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.2.10. Pemasangan 1 buah door closer


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.05 54,000.00
Tukang kayu L.02 0.5 68,000.00
Kepala tukang L.03 0.05 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Door closer set 1.00 350,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.2.11. Pemasangan 1 buah kunci slot


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.02 54,000.00
Tukang kayu L.02 0.20 68,000.00
Kepala tukang L.03 0.02 69,000.00
Mandor L.04 OH 0.001 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci slot Bh 1.00 175,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

99
A.4.6.2.12. Pemasangan 1 buah Door holder

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.05 54,000.00
Tukang kayu L.02 0.5 68,000.00
Kepala tukang L.03 0.05 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Door holder Bh 1.00 125,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.2.13. Pemasangan 1 buah door stop


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.01 54,000.00
Tukang kayu L.02 0.10 68,000.00
Kepala tukang L.03 0.01 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Door stop Bh 1.00 62,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.2.14. Pemasangan 1 buah Rrel pintu sorong


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.06 54,000.00
Tukang kayu L.02 0.6 68,000.00
Kepala tukang L.03 0.06 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rel pintu sorong Set 1.00 235,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.2.15. Pemasangan 1 buah kunci lemari


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.025 54,000.00
Tukang kayu L.02 0.25 68,000.00
Kepala tukang L.03 0.025 69,000.00
Mandor L.04 OH 0.0013 71,000.00
JUMLAH TENAGA KERJA

100
B BAHAN
Kunci lemari Set 1.00 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

101
A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.015 54,000.00
Tukang kayu L.02 OH 0.15 68,000.00
Kepala tukang L.03 OH 0.015 69,000.00
Mandor L.04 OH 0.0008 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 5 mm m2 1.10 115,000.00
SEalant Kg 0.05 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.017 54,000.00
Tukang kayu L.02 OH 0.17 68,000.00
Kepala tukang L.03 OH 0.017 69,000.00
Mandor L.04 OH 0.0009 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 8 mm m2 1.10 280,000.00
SEalant Kg 0.07 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 5 mm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.025 54,000.00
Tukang kayu L.02 OH 0.25 68,000.00
Kepala tukang L.03 OH 0.025 69,000.00
Mandor L.04 OH 0.0013 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca buram 5 mm m2 1.10 170,000.00
SEalant Kg 0.07 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

102
A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.015 54,000.00
Tukang kayu L.02 OH 0.15 68,000.00
Kepala tukang L.03 OH 0.015 69,000.00
Mandor L.04 OH 0.008 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca cermin 5 mm m2 1.10 245,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 7 mm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.075 54,000.00
Tukang kayu L.02 OH 0.15 68,000.00
Kepala tukang L.03 OH 0.015 69,000.00
Mandor L.04 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca patri 7 mm m2 1.10 2,750,000.00
Sealant Kg 0.05 75,000.00
JUMLAH HARGA BAHAN

C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

103
Jumlah
Harga
(Rp)

540.00
34,000.00
3,450.00
355.00
38,345.00

80,000.00
80,000.00

0.00

118,345.00
11,834.50
130,179.50

Jumlah
Harga
(Rp)

270.00
34,000.00
3,450.00
213.00
37,933.00

67,000.00
67,000.00

0.00

104,933.00
10,493.30
115,426.30

Jumlah
Harga
(Rp)

270.00
34,000.00
3,450.00
213.00
37,933.00

145,000.00
145,000.00

0.00

182,933.00
18,293.30
201,226.30

104
Jumlah
Harga
(Rp)

810.00
10,200.00
1,035.00
56.80
12,101.80

20,000.00
20,000.00

0.00

32,101.80
3,210.18
35,311.98

Jumlah
Harga
(Rp)

540.00
6,800.00
690.00
35.50
8,065.50

25,000.00
25,000.00

0.00

33,065.50
3,306.55
36,372.05

Jumlah
Harga
(Rp)

5,400.00
13,600.00
1,380.00
35.50
20,415.50

20,000.00
20,000.00

0.00

40,415.50
4,041.55
44,457.05

105
Jumlah
Harga
(Rp)

810.00
10,200.00
1,035.00
568.00
12,613.00

16,000.00
16,000.00

0.00

28,613.00
2,861.30
31,474.30

Jumlah
Harga
(Rp)

2,700.00
34,000.00
3,450.00
213.00
40,363.00

350,000.00
350,000.00

0.00

390,363.00
39,036.30
429,399.30

Jumlah
Harga
(Rp)

1,080.00
13,600.00
1,380.00
71.00
16,131.00

175,000.00
175,000.00

0.00

191,131.00
19,113.10
210,244.10

106
Jumlah
Harga
(Rp)

2,700.00
34,000.00
3,450.00
213.00
40,363.00

125,000.00
125,000.00

0.00

165,363.00
16,536.30
181,899.30

Jumlah
Harga
(Rp)

540.00
6,800.00
690.00
355.00
8,385.00

62,000.00
62,000.00

0.00

70,385.00
7,038.50
77,423.50

Jumlah
Harga
(Rp)

3,240.00
40,800.00
4,140.00
213.00
48,393.00

235,000.00
235,000.00

0.00

283,393.00
28,339.30
311,732.30

Jumlah
Harga
(Rp)

1,350.00
17,000.00
1,725.00
92.30
20,167.30

107
20,000.00
20,000.00

0.00

40,167.30
4,016.73
44,184.03

108
Jumlah
Harga
(Rp)

810.00
10,200.00
1,035.00
56.80
12,101.80

126,500.00
3,750.00
130,250.00

0.00

142,351.80
14,235.18
156,586.98

Jumlah
Harga
(Rp)

918.00
11,560.00
1,173.00
63.90
13,714.90

308,000.00
5,250.00
313,250.00

0.00

326,964.90
32,696.49
359,661.39

Jumlah
Harga
(Rp)

1,350.00
17,000.00
1,725.00
92.30
20,167.30

187,000.00
5,250.00
192,250.00

0.00

212,417.30
21,241.73
233,659.03

109
Jumlah
Harga
(Rp)

810.00
10,200.00
1,035.00
568.00
12,613.00

269,500.00
269,500.00

0.00

282,113.00
28,211.30
310,324.30

Jumlah
Harga
(Rp)

4,050.00
10,200.00
1,035.00
284.00
15,569.00

3,025,000.00
3,750.00
3,028,750.00

0.00

3,044,319.00
304,431.90
3,348,750.90

110
N. PEKERJAAN CAT / PLITUR :

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.15 54,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Soda api Kg 0.05 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.15 54,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sabun Kg 0.05 12,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.15 54,000.00
Mandor L.04 OH 0.008 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sabun Kg 0.050 12,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

103
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.07 54,000.00
Tukang cat L.02 OH 0.009 66,000.00
Kepala tukang L.03 OH 0.006 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.20 32,500.00
Plamuur Kg 0.15 32,500.00
Cat dasar Kg 0.17 36,000.00
Cat penutup Kg 0.26 59,000.00
Kuas Bh 0.01 17,100.00
Pengencer Kg 0.03 24,000.00
Ampelas Lbr 0.2 4,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.07 54,000.00
Tukang cat L.02 OH 0.105 66,000.00
Kepala tukang L.03 OH 0.004 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.20 32,500.00
Plamuur Kg 0.15 32,500.00
Cat dasar Kg 0.17 36,000.00
Cat penutup Kg 0.35 59,000.00
Kuas Bh 0.01 17,100.00
Pengencer Kg 0.03 20,000.00
Ampelas Lbr 0.2 4,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.04 54,000.00
Tukang cat L.02 OH 0.063 66,000.00
Kepala tukang L.03 OH 0.063 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Teak oil L 0.36 38,000.00
JUMLAH HARGA BAHAN

104
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

105
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.04 54,000.00
Tukang cat L.02 OH 0.06 66,000.00
Kepala tukang L.03 OH 0.016 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Politur L 0.15 38,000.00
Politur jadi L 0.372 77,500.00
Ampelas Lbr 2.00 4,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.10 54,000.00
Mandor L.04 OH 0.006 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Residu atau ter L 0.35 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.02 54,000.00
Tukang cat L.02 OH 0.063 66,000.00
Kepala tukang L.03 OH 0.0063 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.10 27,000
Cat dasar Kg 0.10 14,400
Cat penutup Kg 0.26 31,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

106
A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.028 54,000.00
Tukang cat L.02 OH 0.042 66,000.00
Kepala tukang L.03 OH 0.0042 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.12 14,400.00
Cat penutup Kg 0.18 31,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.7.1.15. Pemasangan 1 m2 wallpaper


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.02 54,000.00
Tukang cat L.02 OH 0.2 66,000.00
Kepala tukang L.03 OH 0.02 69,000.00
Mandor L.04 OH 0.0025 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Wall paper m2 1.20 50,000.00
Lem Kg 0.20 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.02 54,000.00
Tukang cat L.02 OH 0.2 66,000.00
Kepala tukang L.03 OH 0.02 69,000.00
Mandor L.04 OH 0.0025 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Menie besi Kg 0.10 45,000.00
Kwas Bh 0.01 17,100.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

107
A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.25 54,000.00
Tukang cat L.02 OH 0.225 66,000.00
Kepala tukang L.02 OH 0.0225 69,000.00
Mandor L.04 OH 0.0075 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Menie besi Kg 0.10 45,000.00
Pengencer L 0.01 20,000.00
Kwas Bh 0.01 17,100.00
Perancah kayu m3 0.002 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.25 54,000.00
Tukang cat L.02 OH 0.25 66,000.00
Kepala tukang L.03 OH 0.025 69,000.00
Mandor L.04 OH 0.0013 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Menie A Kg 0.10 45,000.00
Menie B Kg 0.10 45,000.00
Cat Kg 0.08 52,000.00
Kwas Bh 0.01 17,100.00
Pengencer L 0.01 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.06 54,000.00
Tukang cat L.02 OH 0.06 66,000.00
Kepala tukang L.03 OH 0.012 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat Kg 0.30 54,000.00
Kwas Bh 0.01 17,100.00
Pengencer L 0.01 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

108
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

109
A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.40 54,000.00
Tukang cat L.02 OH 0.80 66,000.00
Kepala tukang L.03 OH 0.08 69,000.00
Mandor L.04 OH 0.02 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.11 45,000.00
Cat antara Kg 0.17 52,000.00
Cat penutup Kg 0.08 54,000.00
Kwas Bh 0.01 17,100.00
Pengencer L 0.01 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.40 54,000.00
Tukang cat L.02 OH 0.70 66,000.00
Kepala tukang L.03 OH 0.07 69,000.00
Mandor L.04 OH 0.02 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.30 45,000.00
Pengencer L 0.01 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

110
Jumlah
Harga
(Rp)

8,100.00
213.00
8,313.00

1,250.00
1250.00

0.00

9,563.00
956.30
10,519.30

Jumlah
Harga
(Rp)

8,100.00
213.00
8,313.00

600.00
600.00

0.00

8,913.00
891.30
9,804.30

Jumlah
Harga
(Rp)

8,100.00
568.00
8,668.00

600.00
600.00

0.00

9,268.00
926.80
10,194.80

111
kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Jumlah
Harga
(Rp)

3,780.00
594.00
414.00
213.00
5,001.00

6,500.00
4,875.00
6,120.00
15,340.00
171.00
720.00
900.00
34,626

0.00

39,627.00
3,962.70
43,589.70

kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Jumlah
Harga
(Rp)

3,780.00
6,930.00
276.00
213.00
11,199.00

6,500.00
4,875.00
6,120.00
20,650.00
171.00
600.00
900.00
39,816.00

0.00

51,015.00
5,101.50
56,116.50

Jumlah
Harga
(Rp)

2,160.00
4,158.00
4,347.00
213.00
10,878.00

13,680.00
13,680.00

112
0.00

24,558.00
2,455.80
27,013.80

113
Jumlah
Harga
(Rp)

2,160.00
3,960.00
1,104.00
213.00
7,437.00

5,700.00
28,830.00
9,000.00
43,530.00

0.00

50,967.00
5,096.70
56,063.70

Jumlah
Harga
(Rp)

5,400.00
426.00
5,826.00

5,250.00
5,250.00

0.00

11,076.00
1,107.60
12,183.60

Jumlah
Harga
(Rp)

1,080.00
4,158.00
434.70
213.00
5,885.70

2,700.00
1,440.00
8,060.00
12,200.00

0.00

18,085.70
1,808.57
19,894.27

114
Jumlah
Harga
(Rp)

1,512.00
2,772.00
289.80
213.00
4,786.80

1,728.00
5,580.00
7,308.00

0.00

12,094.80
1,209.48
13,304.28

Jumlah
Harga
(Rp)

1,080.00
13,200.00
1,380.00
177.50
15,837.50

60,000.00
5,000.00
65,000.00

0.00

80,837.50
8,083.75
88,921.25

Jumlah
Harga
(Rp)

1,080.00
13,200.00
1,380.00
177.50
15,837.50

4,500.00
171.00
4,671.00

0.00

20,508.50
2,050.85
22,559.35

115
Jumlah
Harga
(Rp)

13,500.00
14,850.00
1,552.50
532.50
30,435.00

4,500.00
200.00
171.00
50.00
4,921.00

0.00

35,356.00
3,535.60
38,891.60

Jumlah
Harga
(Rp)

13,500.00
16,500.00
1,725.00
92.30
31,817.30

4,500.00
4,500.00
4,160.00
171.00
200.00
13,531.00

0.00

45,348.30
4,534.83
49,883.13

Jumlah
Harga
(Rp)

3,240.00
3,960.00
828.00
213.00
8,241.00

16,200.00
171.00
200.00
16,571.00

0.00

24,812.00

116
2,481.20
27,293.20

117
Jumlah
Harga
(Rp)

21,600.00
52,800.00
5,520.00
1,420.00
81,340.00

4,950.00
8,840.00
4,320.00
171.00
200.00
18,481.00

0.00

99,821.00
9,982.10
109,803.10

ukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir


Jumlah
Harga
(Rp)

21,600.00
46,200.00
4,830.00
1,420.00
74,050.00

13,500.00
200.00
13,700.00

0.00

87,750.00
8,775.00
96,525.00

118
J. A.5.1.1
PEKERJAAN SANITASI
HARGA SATUAN: PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.1. Pemasangan 1 buah closet duduk/monoblock


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 3.30 54,000.00
Tukang batu L.02 OH 1.10 66,000.00
Kepala tukang L.03 OH 0.01 69,000.00
Mandor L.04 OH 0.16 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Closet duduk Unit 1.00 2,460,000.00
Perlengkapan Ls 6% x closet 147,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.5.1.1 2. Pemasangan 1 buah closet jongkok porslen


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.00 54,000.00
Tukang batu L.02 OH 1.50 66,000.00
Kepala tukang L.03 OH 0.15 69,000.00
Mandor L.04 OH 0.16 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Closet jongkok Unit 1.00 459,000.00
Semen Portland Kg 6.00 1,200.00
Pasir pasang M3 0.01 171.43
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.5.1.1 4. Pemasangan 1 buah urinoir


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.00 54,000.00
Tukang batu L.02 OH 1.00 66,000.00
Kepala tukang L.03 OH 0.10 69,000.00
Mandor L.04 OH 0.05 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Urinoir Unit 1.00 1,800,000.00
Semen Portland Kg 6.00 1,200.00
Pasir pasang M3 0.01 240,000.00
Perlengkapan % 30.00 1,800,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

109
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

110
A.5.1.1 5. Pemasangan 1 buah wastafel
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 1.20 54,000.00
Tukang batu L.02 OH 1.45 66,000.00
Kepala tukang L.03 OH 0.15 69,000.00
Mandor L.04 OH 0.06 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Wastafel Unit 1.20 900,000.00
Semen Portland Kg 6.00 1,200.00
Pasir pasang M3 0.01 240,000.00
Perlengkapan % 12.00 1,080,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.5.1.1 7. Pemasangan 1 buah bak fibreglass vol 1 m3


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 3.00 54,000.00
Tukang batu L.02 OH 4.50 66,000.00
Kepala tukang L.03 OH 0.05 69,000.00
Mandor L.04 OH 0.90 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bak fibreglass Unit 1.00 275,000.00
Perlengkapan Ls 12%xbak 33,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.5.1.1 8. Pemasangan 1 buah bak mandi batu bata vol 0,30 m3

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 6.00 54,000.00
Tukang batu L.02 OH 3.00 66,000.00
Kepala tukang L.03 OH 0.30 69,000.00
Mandor L.04 OH 0.03 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah M3 150.00 750.00
Semen portlan Kg 120.00 1,200.00
Pasir pasang M3 0.30 240,000.00
Porselen 11x11 bh 360.00 500.00
Semen warna Kg 6.00 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

111
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

112
A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.03 54,000.00
Tukang batu L.02 OH 0.30 66,000.00
Kepala tukang L.03 OH 0.03 69,000.00
Mandor L.04 OH 0.015 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bak cuci piring Unit 1.00 250,000.00
Waterdrain Bh 1.00 55,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.5.1.1 14. Pemasangan 1 buah floor drain

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.01 54,000.00
Tukang batu L.02 OH 0.10 66,000.00
Kepala tukang L.03 OH 0.01 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Floor drain Unit 1.00 40,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 2.16 54,000.00
Tukang batu L.02 OH 0.72 66,000.00
Kepala tukang L.03 OH 0.072 69,000.00
Mandor L.04 OH 0.011 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 40.00 750.00
Semen portland Kg 44.00 1,200.00
Pasir pasang M3 0.07 240,000.00
Pasir beton M3 0.06 250,000.00
Kerikil 2/3 M3 0.07 250,000.00
Baja tulangan Kg 1.60 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

113
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 3.2 54,000.00
Tukang batu L.02 OH 1.15 66,000.00
Kepala tukang L.03 OH 0.011 69,000.00
Mandor L.04 OH 0.016 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.00 750.00
Semen portland Kg 77.00 1,200.00
Pasir pasang M3 0.13 240,000.00
Pasir beton M3 0.09 250,000.00
Kerikil 2/3 M3 0.02 250,000.00
Baja tulangan Kg 2.60 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 3.2 54,000.00
Tukang batu L.02 OH 1.15 66,000.00
Kepala tukang L.03 OH 0.011 69,000.00
Mandor L.04 OH 0.016 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 123.00 750.00
Semen portland Kg 114.00 1,200.00
Pasir pasang M3 0.184 240,000.00
Pasir beton M3 0.12 250,000.00
Kerikil 2/3 M3 0.033 250,000.00
Baja tulangan Kg 4.85 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.054 54,000
Tukang batu L.02 OH 0.09 66,000
Kepala tukang L.03 OH 0.009 69,000
Mandor L.04 OH 0.027 71,000
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis ½” M 1.20 15,000.00
Perlengkapan Ls 35%xpipa 18,000.00
JUMLAH HARGA BAHAN
C PERALATAN

114
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

115
A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4”
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA KERJA
Pekerja L.01 OH 0.01 54,000.00
Tukang batu L.02 OH 0.4 66,000.00
Kepala tukang L.03 OH 0.04 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kran air M 1.00 70,000.00
Sealtape Buah 0.025 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter 3/4”


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.054 54,000
Tukang batu L.02 OH 0.09 66,000
Kepala tukang L.03 OH 0.009 69,000
Mandor L.04 OH 0.027 71,000
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 3/4” M 1.20 19,500.00
Perlengkapan % 35.00 23,400.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1”


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.054 54,000.00
Tukang batu L.02 OH 0.09 66,000.00
Kepala tukang L.03 OH 0.009 69,000.00
Mandor L.04 OH 0.027 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 1” M 1.20 25,500.00
Perlengkapan % 35.00 30,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

116
A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½”
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.108 54,000.00
Tukang batu L.02 OH 0.18 66,000.00
Kepala tukang L.03 OH 0.018 69,000.00
Mandor L.04 OH 0.005 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 11/2” M 1.20 35,400.00
Perlengkapan % 35.00 42,480.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2”

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.036 54,000.00
Tukang batu L.02 OH 0.06 66,000.00
Kepala tukang L.03 OH 0.006 69,000.00
Mandor L.04 OH 0.002 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1/2” M 1.20 5,625.00
Perlengkapan % 35.00 6,750.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.036 54,000.00
Tukang batu L.02 OH 0.06 66,000.00
Kepala tukang L.03 OH 0.006 69,000.00
Mandor L.04 OH 0.002 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3/4” M 1.20 7,175.00
Perlengkapan % 35.00 8,610.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

117
A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1”

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.036 54,000.00
Tukang batu L.02 OH 0.06 66,000.00
Kepala tukang L.03 OH 0.006 69,000.00
Mandor L.04 OH 0.002 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1” M 1.20 9,800.00
Perlengkapan % 35.00 11,760.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.054 54,000.00
Tukang batu L.02 OH 0.09 66,000.00
Kepala tukang L.03 OH 0.009 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1 1/2” M 1.20 16,900.00
Perlengkapan % 35.00 20,280.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.054 54,000.00
Tukang batu L.02 OH 0.09 66,000.00
Kepala tukang L.03 OH 0.009 69,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 2” M 1.20 21,625.00
Perlengkapan % 35.00 25,950.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

118
A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 1/2”
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.081 54,000.00
Tukang batu L.02 OH 0.135 66,000.00
Kepala tukang L.03 OH 0.0135 69,000.00
Mandor L.04 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 2 1/2” M 1.20 30,000.00
Perlengkapan % 35.00 36,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.081 54,000.00
Tukang batu L.02 OH 0.135 66,000.00
Kepala tukang L.03 OH 0.0135 69,000.00
Mandor L.04 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3” M 1.20 42,525.00
Perlengkapan % 35.00 51,030.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.081 54,000.00
Tukang batu L.02 OH 0.135 66,000.00
Kepala tukang L.03 OH 0.0135 69,000.00
Mandor L.04 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4” M 1.20 70,425.00
Perlengkapan % 35.00 84,510.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

119
Jumlah
Harga
(Rp)

178,200.00
72,600.00
690.00
11,360.00
262,850.00

2,460,000.00
147,600.00
2,607,600.00

0.00

2,870,450.00
287,045.00
3,157,495.00

Jumlah
Harga
(Rp)

54,000.00
99,000.00
10,350.00
11,360.00
174,710.00

459,000.00
7,200.00
1.71
466,201.71

0.00

640,911.71
64,091.17
705,002.89

Jumlah
Harga
(Rp)

54,000.00
66,000.00
6,900.00
3,550.00
130,450.00

1,800,000.00
7,200.00
2,400.00
540,000.00
2,349,600.00

0.00

120
2,480,050.00
248,005.00
2,728,055.00

121
Jumlah
Harga
(Rp)

64,800.00
95,700.00
10,350.00
4,260.00
175,110.00

1,080,000.00
7,200.00
2,400.00
129,600.00
1,219,200.00

0.00

1,394,310.00
139,431.00
1,533,741.00

Jumlah
Harga
(Rp)

162,000.00
297,000.00
3,450.00
63,900.00
526,350.00

275,000.00
33,000.00
308,000.00

0.00

834,350.00
83,435.00
917,785.00

Jumlah
Harga
(Rp)

324,000.00
198,000.00
20,700.00
2,130.00
544,830.00

112,500.00
144,000.00
72,000.00
180,000.00
84,000.00
592,500.00

0.00

122
1,137,330.00
113,733.00
1,251,063.00

123
Jumlah
Harga
(Rp)

1,620.00
19,800.00
2,070.00
1,065.00
24,555.00

250,000.00
55,000.00
305,000.00

0.00

329,555.00
32,955.50
362,510.50

Jumlah
Harga
(Rp)

540.00
6,600.00
690.00
355.00
8,185.00

40,000.00
40,000.00

0.00

48,185.00
4,818.50
53,003.50

Jumlah
Harga
(Rp)

116,640.00
47,520.00
4,968.00
781.00
169,909.00

30,000.00
52,800.00
16,800.00
15,000.00
17,500.00
20,240.00
152,340.00

0.00

322,249.00
32,224.90
354,473.90

124
Jumlah
Harga
(Rp)

172,800.00
75,900.00
759.00
1,136.00
250,595.00

52,500.00
92,400.00
31,200.00
22,500.00
5,000.00
32,890.00
236,490.00

0.00

487,085.00
48,708.50
535,793.50

Jumlah
Harga
(Rp)

172,800.00
75,900.00
759.00
1,136.00
250,595.00

92,250.00
136,800.00
44,160.00
30,000.00
8,250.00
61,352.50
372,812.50

0.00

623,407.50
62,340.75
685,748.25

Jumlah
Harga
(Rp)

2,916.00
5,940.00
621.00
1,917.00
11,394.00

18,000.00
6,300.00
24,300.00

125
0.00

35,694.00
3,569.40
39,263.40

126
Jumlah
Harga
(Rp)

540.00
26,400.00
2,760.00
355.00
30,055.00

70,000.00
225.00
70,225.00

0.00

100,280.00
10,028.00
110,308.00

Jumlah
Harga
(Rp)

2,916.00
5,940.00
621.00
1,917.00
11,394.00

23,400.00
8,190.00
31,590.00

0.00

42,984.00
4,298.40
47,282.40

Jumlah
Harga
(Rp)

2,916.00
5,940.00
621.00
1,917.00
11,394.00

30,600.00
10,710.00
41,310.00

0.00

52,704.00
5,270.40
57,974.40

127
Jumlah
Harga
(Rp)

5,832.00
11,880.00
1,242.00
355.00
19,309.00

42,480.00
14,868.00
57,348.00

0.00

76,657.00
7,665.70
84,322.70

Jumlah
Harga
(Rp)

1,944.00
3,960.00
414.00
142.00
6,460.00

6,750.00
2,362.50
9,112.50

0.00

15,572.50
1,557.25
17,129.75

Jumlah
Harga
(Rp)

1,944.00
3,960.00
414.00
142.00
6,460.00

8,610.00
3,013.50
11,623.50

0.00

18,083.50
1,808.35
19,891.85

128
Jumlah
Harga
(Rp)

1,944.00
3,960.00
414.00
142.00
6,460.00

11,760.00
4,116.00
15,876.00

0.00

22,336.00
2,233.60
24,569.60

Jumlah
Harga
(Rp)

2,916.00
5,940.00
621.00
213.00
9,690.00

20,280.00
7,098.00
27,378.00

0.00

37,068.00
3,706.80
40,774.80

Jumlah
Harga
(Rp)

2,916.00
5,940.00
621.00
213.00
9,690.00

25,950.00
9,082.50
35,032.50

0.00

44,722.50
4,472.25
49,194.75

129
Jumlah
Harga
(Rp)

4,374.00
8,910.00
931.50
284.00
14,499.50

36,000.00
12,600.00
48,600.00

0.00

63,099.50
6,309.95
69,409.45

Jumlah
Harga
(Rp)

4,374.00
8,910.00
931.50
284.00
14,499.50

51,030.00
17,860.50
68,890.50

0.00

83,390.00
8,339.00
91,729.00

Jumlah
Harga
(Rp)

4,374.00
8,910.00
931.50
284.00
14,499.50

84,510.00
29,578.50
114,088.50

0.00

128,588.00
12,858.80
141,446.80

130
O. PEKERJAAN KANSTEEN DAN PASANGAN BUIS BETON :

O.1. 1 m' Pasangan kansteen batu bata 1 : 2


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah m³ 0.0300 42,275.00
Urug pasir m³ 0.0075 16,910.00
Pasang bata m² 0.3000 24,555.00
Plester m² 0.1500 28,200.00
JUMLAH TENAGA KERJA
B BAHAN
Urug pasir m³ 0.0075 180,000.00
Pasang bata m³ 0.3000 84,360.00
Plester m² 0.1500 17,068.80
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

O.2. 1 m' Kansteen batu bata 1 : 4


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah m³ 0.0300 42,275.00
Urug pasir m³ 0.0075 16,910.00
Pasang bata m² 0.3000 24,555.00
Plester m² 0.1500 28,200.00
JUMLAH TENAGA KERJA
B BAHAN
Urug pasir m³ 0.0075 180,000.00
Pasang bata m³ 0.3000 76,620.00
Plester m² 0.1500 13,248.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

O.3. 1 m' Pasang Got U - 20


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah m3 0.0600 42,275.00
Urug pasir m3 0.0150 16,910.00
Pasang bata 1 : 4 m2 0.0180 24,555.00
JUMLAH TENAGA KERJA
B BAHAN
Pasangan bata 1 : 4 m3 0.0060 76,620.00
Got U - 20 m3 1.0000
JUMLAH 55,000.00
HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

117
O.4. 1 m' Pasang Got U - 30
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah m3 0.0600 42,275.00
Urug pasir m3 0.0150 16,910.00
Pasang bata 1 : 4 m2 0.0180 24,555.00
JUMLAH TENAGA KERJA
B BAHAN
Pasangan bata 1 : 4 m3 0.0060 76,620.00
Got U - 30 m3 1.0000 60,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

O.5. 1 m' Pasang Buis beton Ø 20 cm dengan Rolag Bata 1 : 4 (Rolag penuh)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah : 0,70 x 0,90 x 1 42,275.00
Urug kembali : 1/3 x 0,7 x 0,9 x 1 30,550.00
Urug pasir : 0,10 x 0,70 x 0,90 15,275.00
Pas Bt 1 : 4 : 3,143 x 0,45 x 1 24,555.00
Buang tanah : 2/3 x 0,70 x 0,9 x1 33,605.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,70 x 1,00 180,000.00
Pas bata 1 : 4 : 3,143 x 0,45 x 1 76,620.00
Buis beton Ø 20 cm : 1 bh x 1,00 65,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

O.6. 1 m' Pasang Buis beton Ø 30 cm dengan Rolag Bata 1 : 4 (Rolag penuh)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah : 0,80 x 1,00 x 1,0 42,275.00
Urug Kembali : 1/3 x 0,8 x 1,00 x 1 30,550.00
Urug pasir : 0,10 x 0,80 x 1,0 15,275.00
Pas bata 1 : 4 : 3,143 x 0,55 x 1 24,555.00
Buang tanah : 2/3 x 0,8 x 1, x 1 33,605.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,80 x 1,00 180,000.00
Pas bata 1 : 4 : 3,143 x 0,55 x 1 76,620.00
Buis beton Ø 30 cm : 1 bh x 1,00 72,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

118
O.7. 1 m' Pasang Buis beton Ø 40 cm dengan Rolag Bata 1 : 4 (Rolag penuh)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah : 0,90 x 1,10 x 1,0 42,275.00
Urug Kembali : 1/3 x 0,9 x 1,10 x 1 30,550.00
Urug pasir : 0,10 x 0,90 x 1,0 15,275.00
Pas bata 1 : 4 : 3,143 x 0,65 x 1 24,555.00
Buang tanah : 2/3 x 0,9 x 1,00 x 1 33,605.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,90 x 1,00 180,000.00
Pas bata 1 : 4 : 3,143 x 0,65 x 1 76,620.00
Buis beton Ø 40 cm : 1 bh x 1,00 80,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

O.8. 1 m' Pasang Buis beton Ø 50 cm dengan Rolag Bata 1 : 4 (Rolag penuh)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah : 1,00 x 1,20 x 1,0 42,275.00
Urug Kembali : 1/3 x 1 x 1,20 x 1 30,550.00
Urug pasir : 0,10 x 1 x 1,0 15,275.00
Pas bata 1 : 4 : 3,143 x 0,75 x 1 24,555.00
Buang tanah : 2/3 x 0,9 x 1,00 x 1 33,605.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 1,00 x 1,00 180,000.00
Pas bata 1 : 4 : 3,143 x 0,75 x 1 76,620.00
Buis beton Ø 50 cm : 1 bh x 1,00 97,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

O.9. 1 m' Pasang Buis beton Ø 60 cm dengan Rolag Bata 1 : 4 (Rolag penuh)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah : 1,10 x 1,30 x 1,0 42,275.00
Urug Kembali : 1/3 x 1,10 x 1,30 x 1 30,550.00
Urug pasir : 0,10 x 1,10 x 1,0 15,275.00
Pas bata 1 : 4 : 3,143 x 0,85 x 1 24,555.00
Buang tanah : 2/3 x 1,10 x 1,30 x 1 33,605.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 1,10 x 1,00 180,000.00
Pas bata 1 : 4 : 3,143 x 0,85 x 1 76,620.00
Buis beton Ø 60 cm : 1 bh x 1,00 109,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

119
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

120
O.10. 1 m' Pasang Buis beton Ø 80 cm dengan Rolag Bata 1 : 4 (Rolag penuh)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah : 1,30 x 1,40 x 1,0 42,275.00
Urug Kembali : 1/3 x 1,30 x 1,40 x 1 30,550.00
Urug pasir : 0,10 x 1,30 x 1,0 15,275.00
Pas bata 1 : 4 : 3,143 x 1,05 x 1 24,555.00
Buang tanah : 2/3 x 1,30 x 1,40 x 1 33,605.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 1,30 x 1,00 180,000.00
Pasangan bata 1 : 4 : 3,143 x 1,05 x 1 76,620.00
Buis beton Ø 80 cm : 1 bh x 1,00 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

O.11. 1 m' Pasang Buis beton Ø 20 cm dengan Cincin bata 1 : 4


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah : 0,60 x 0,70 x 1 x 42,275.00
Urug Kembali : 1/3 x 0,6 x 0,7 x 1 x 30,550.00
Urug pasir : 0,10 x 0,60 x 1 15,275.00
Pas bata 1 : 4 : 3,143 x 0,45 x 0,30 x 1 24,555.00
Buang tanah : 2/3 x 0,60 x 0,7 x 1 33,605.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,60 x 1,00 180,000.00
Pas bata 1 : 4 : 3,143 x 0,45 x 0,3 76,620.00
Buis beton Ø 20 cm : 1 bh x 1,00 65,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

O.12. 1 m' Pasang Buis beton Ø 30 cm dengan Cincin bata 1 : 4


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah : 0,70 x 0,80 x 1 x 42,275.00
Urug Kembali : 1/3 x 0,6 x 0,7 x 1 x 30,550.00
Urug pasir : 0,10 x 0,70 x 1 15,275.00
Pas bata 1 : 4 : 3,143 x 0,55 x 0,30 x 1 24,555.00
Buang tanah : 2/3 x 0,70 x 0,8 x 1 33,605.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,70 x 1,00 180,000.00
Pas bata 1 : 4 : 3,143 x 0,55 x 0,3 76,620.00
Buis beton Ø 30 cm : 1 bh x 1,00 JUMLAH 72,000.00
HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

121
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

122
O.13. 1 m' Pasang Buis beton Ø 40 cm dengan Cincin bata 1 : 4
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah : 0,80 x 0,90 x 1 x 42,275.00
Urug Kembali : 1/3 x 0,80 x 0,90 x 1 x 30,550.00
Urug pasir : 0,10 x 0,80 x 1,0 15,275.00
Pas bata 1 : 4 : 3,143 x 0,65 x 0,30 x 1 24,555.00
Buang tanah : 2/3 x 0,80 x 0,9 x 1 33,605.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,80 x 1,00 180,000.00
Pas bata 1 : 4 : 3,143 x 0,65 x 0,3 76,620.00
Buis beton Ø 40 cm : 1 bh x 1,00 80,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

O.14. 1 m' Pasang Buis beton Ø 50 cm dengan Cincin bata 1 : 4


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah : 0,90 x 1,00 x 1,0 x 42,275.00
Urug Kembali : 1/3 x 0,90 x 1,00 x 1 x 30,550.00
Urug pasir : 0,10 x 0,90 x 1,0 x 1 15,275.00
Pas bata 1 : 4 : 3,143 x 0,75 x 0,3 x 1 24,555.00
Buang tanah : 2/3 x 0,90 x 1 x 1 33,605.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,90 x 1,00 180,000.00
Pas bata 1 : 4 : 3,143 x 0,75 x 0,3 76,620.00
Buis beton Ø 50 cm : 1 bh x 1,00 97,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

O.15. 1 m' Pasang Buis beton Ø 60 cm dengan Cincin bata 1 : 4


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah : 1,00 x 1,10 x 1,0 x 42,275
Urug Kembali : 1/3 x 1,00 x 1,10 x 1 x 30,550
Urug pasir : 0,10 x 1,00 x 1,00 x 1 15,275
Pas bata 1 : 4 : 3,143 x 0,85 x 0,3 x 1 24,555
Buang tanah : 2/3 x 1 x 1,10 x 1 33,605
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 1,00 x 1,00 180,000.00
Pas bata 1 : 4 : 3,143 x 0,85 x 0,3 76,620.00
Buis beton Ø 60 cm : 1 bh x 1,00 109,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

123
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

124
O.16. 1 m' Pasang Buis beton U 20 cm lengkap dengan Cincin bata 1 : 4
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah : 0,60 x 0,40 x 1 x 42,275
Urug Kembali : 1/3 x 0,60 x 0,40 x 1 x 30,550
Urug pasir : 0,10 x 0,60 x 1,0 x 1 15,275
Pas bata 1 : 4 : 1,58 x 0,45 x 0,3 x 76,620
Buang tanah : 2/3 x 0,60 x 0,40 x 1 33,605
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,60 x 1,00 180,000.00
Pas bata 1 : 4 : 1,58 x 0,45 x 0,3 76,620.00
Buis beton U 20 cm : 1 bh x 1,00 55,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

O.17. 1 m' Pasang Buis beton U 30 cm lengkap dengan Cincin bata 1 : 4


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Galian tanah : 0,70 x 0,45 x 1 x 42,275
Urug Kembali : 1/3 x 0,70 x 0,45 x 1 x 30,550
Urug pasir : 0,10 x 0,70 x 1,0 x 1 15,275
Pas bata 1 : 4 : 1,58 x 0,55 x 0,15 x 0,3 76,620
Buang tanah : 2/3 x 0,70 x 0,45 x 1 33,605
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,70 x 1,00 180,000.00
Pas bata 1 : 4 : 1,58 x 0,55 x 0,3 76,620.00
Buis beton U 30 cm : 1 bh x 1,00 60,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

O.18. 1 m2 Pasang paving kawung lokal tebal 6 cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja OH 0.2400 54,000.00
Tukang batu OH 0.0800 66,000.00
Kepala Tukang OH 0.0080 69,000.00
Mandor OH 0.0120 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Paving kawung t 6 cm m2 1.0500 72,400.00
Pasir Pasang m3 0.1200 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

125
O.19. 1 m2 Pasang paving kawung lokal tebal 8 cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja OH 0.2400 54,000.00
Tukang batu OH 0.0800 66,000.00
Kepala Tukang OH 0.0080 69,000.00
Mandor OH 0.0120 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Paving kawung t 8 cm m2 1.0500 98,500.00
Pasir Pasang m3 0.1200 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

O.20. 1 m2 Pasang paving kawung tebal 6 cm SNI


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja OH 0.2400 54,000.00
Tukang batu OH 0.0800 66,000.00
Kepala Tukang OH 0.0080 69,000.00
Mandor OH 0.0120 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Paving kawung SNI m2 1.0500 99,600.00
Pasir Pasang m3 0.1200 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

O.21. 1 m2 Pasang Paving kawung tebal 8 cm SNI


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja OH 0.2400 54,000.00
Tukang batu OH 0.0800 66,000.00
Kepala Tukang OH 0.0080 69,000.00
Mandor OH 0.0120 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Paving kawung SNI m2 1.0500 144,900.00
Pasir Pasang m3 0.1200 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

126
Jumlah
Harga
(Rp)

42,275.00
126.83
7,366.50
4,230.00
53,998.33

1,350.00
25,308.00
2,560.32
29,218.32

0.00

83,216.65
8,321.66
91,538.31

Jumlah
Harga
(Rp)

1,268.25
126.83
7,366.50
4,230.00
12,991.58

1,350.00
22,986.00
1,987.20
26,323.20

0.00

39,314.78
3,931.48
43,246.25

Jumlah
Harga
(Rp)

2,536.50
253.65
441.99
3,232.14

459.72
55,000.00
55,459.72

0.00

58,691.86
5,869.19
64,561.05

127
Jumlah
Harga
(Rp)

2,536.50
253.65
441.99
3,232.14

459.72
60,000.00
60,459.72

0.00

63,691.86
6,369.19
70,061.05

Jumlah
Harga
(Rp)

26,633.25
19,246.50
962.33
34,729.36
20,163.00
81,571.44

12,600.00
108,367.50
65,000.00
185,967.50

0.00

267,538.94
26,753.89
294,292.83

Jumlah
Harga
(Rp)

33,820.00
8,146.67
1,222.00
42,447.00
17,922.67
103,558.33

14,400.00
132,449.16
72,000.00
218,849.16

0.00

322,407.50
32,240.75
354,648.25

128
Jumlah
Harga
(Rp)

41,852.25
10,081.50
1,374.75
50,164.64
20,163.00
123,636.14

16,200.00
156,530.83
80,000.00
252,730.83

0.00

376,366.97
37,636.70
414,003.66

Jumlah
Harga
(Rp)

50,730.00
12,220.00
1,527.50
57,882.27
20,163.00
142,522.77

18,000.00
180,612.50
97,000.00
295,612.50

0.00

438,135.27
43,813.53
481,948.80

Jumlah
Harga
(Rp)

60,453.25
14,562.17
1,680.25
65,599.91
32,036.77
174,332.34

19,800.00
204,694.16
109,000.00
333,494.16

0.00

507,826.50

129
50,782.65
558,609.16

130
Jumlah
Harga
(Rp)

76,940.50
18,533.67
1,985.75
108,046.91
40,774.07
246,280.89

23,400.00
252,857.49
115,000.00
391,257.49

0.00

637,538.39
63,753.84
701,292.23

Jumlah
Harga
(Rp)

17,755.50
4,277.00
916.50
10,418.81
9,409.40
42,777.21

10,800.00
32,510.25
65,000.00
108,310.25

0.00

151,087.46
15,108.75
166,196.20

Jumlah
Harga
(Rp)

23,674.00
4,277.00
1,069.25
12,734.10
12,545.87
54,300.22

12,600.00
39,734.75
72,000.00
124,334.75

0.00

178,634.97

131
17,863.50
196,498.46

132
Jumlah
Harga
(Rp)

30,438.00
7,332.00
1,222.00
15,049.39
16,130.40
70,171.79

14,400.00
46,959.25
80,000.00
141,359.25

0.00

211,531.04
21,153.10
232,684.14

Jumlah
Harga
(Rp)

38,047.50
9,165.00
1,374.75
17,364.68
20,163.00
86,114.93

16,200.00
54,183.75
97,000.00
167,383.75

0.00

253,498.68
25,349.87
278,848.55

Jumlah
Harga
(Rp)

46,502.50
11,201.67
1,527.50
19,679.97
24,643.67
103,555.31

18,000.00
61,408.25
109,000.00
188,408.25

0.00

291,963.55

133
29,196.36
321,159.91

134
Jumlah
Harga
(Rp)

10,146.00
2,444.00
916.50
16,343.05
5,376.80
35,226.35

10,800.00
16,343.05
55,000.00
82,143.05

0.00

117,369.39
11,736.94
129,106.33

Jumlah
Harga
(Rp)

13,316.63
7,128.33
1,069.25
2,996.23
7,057.05
31,567.48

12,600.00
19,974.83
60,000.00
92,574.83

0.00

124,142.32
12,414.23
136,556.55

Jumlah
Harga
(Rp)

12,960.00
5,280.00
552.00
852.00
19,644.00

76,020.00
28,800.00
104,820.00

0.00

124,464.00
12,446.40
136,910.40

135
Jumlah
Harga
(Rp)

12,960.00
5,280.00
552.00
852.00
19,644.00

103,425.00
28,800.00
132,225.00

0.00

151,869.00
15,186.90
167,055.90

Jumlah
Harga
(Rp)

12,960.00
5,280.00
552.00
852.00
19,644.00

104,580.00
28,800.00
133,380.00

0.00

153,024.00
15,302.40
168,326.40

Jumlah
Harga
(Rp)

12,960.00
5,280.00
552.00
852.00
19,644.00

152,145.00
28,800.00
180,945.00

0.00

200,589.00
20,058.90
220,647.90

136
PEKERJAAN SUMBER DAYA AIR:

a). Kistdam pasir/tanah dibungkus plastik bagor (sebesar karung beras 25 kg) uk. 43 cm x 65 cm (1 buah)

Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.04 54,000.00
Mandor L.04 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Karung plastik/bagor bh 1.00 1,500.00
Tali rapia/plastik m 2.00 500.00
Pasir m3 0.12 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

P.06 Pasangan Batu Bronjong Kawat


a). Pasangan batu bronjong kawat Bentuk I

4). Betuk I, Tipe D Bronjong Kawat uk. L=2,0m x B=1,0 x T= 0,5m berisi batu kali/belah
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kaw
pengikat 2,0 mm, ukuran lubang heksagonal 80 x 100 mm;
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja Penganyam L.01 OH 1.14 54,000.00
Tukang Penganyam L.02 OH 0.38 64,000.00
Pekerja Pengisi Batu L.03 OH 0.325 54,000.00
Mandor L.04 OH 0.298 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu Belah m3 1.3 220,000.00
Kawat Bronjong Kg 15.10 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

(b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat
2,0 mm, ukuran lubang heksagonal 100 x 120 mm;
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja Penganyam L.01 OH 1.17 54,000.00
Tukang Penganyam L.02 OH 0.39 64,000.00
Pekerja Pengisi Batu L.01 OH 0.325 54,000.00
Mandor L.04 OH 0.304 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu Belah m3 1.3 220,000.00
Kawat Bronjong Kg 15.551 20,000.00

124
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

125
P.07 Cerucuk
a). 1 m panjang cerucuk kayu/dolken diameter 8cm - 10cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.03 54,000.00
Tukang Batu L.02 OH 0.005 66,000.00
Mandor L.04 OH 0.003 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Dolken 8cm - 10cm m 1.05 8,333.33

JUMLAH HARGA BAHAN


C PERALATAN

ls 1 6,500.00
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D

F. Harga Satuan Pekerjaan (D+E)

b). 1 m panjang cerucuk bambu diameter 8cm - 10cm


Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.04 54,000.00
Tukang Batu L.02 OH 0.006 66,000.00
Mandor L.04 OH 0.004 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bambu dia 8cm - 10cm m 1.05 4,333.33
JUMLAH HARGA BAHAN
C PERALATAN
ls 1 6,500.00
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

P.08 Pasang batu muka dan batu candi


a). Pasangan batu muka (1 m2)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.24 54,000.00
Tukang batu L.02 OH 0.12 66,000.00
Kepala tukang L.03 OH 0.012 69,000.00
Mandor L.04 OH 0.024 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu muka M2 1.250 70,000.00
Pasir Pasang m3 0.025 240,000.00
Portlan cement kg 5.000 1,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)

126
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

127
b). Pasangan batu candi (1 m2)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.24 54,000.00
Tukang batu L.02 OH 0.12 66,000.00
Kepala tukang L.03 OH 0.012 69,000.00
Mandor L.04 OH 0.024 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu candi M2 1.20 120,000.00
Pasir Pasang m3 0.025 240,000.00
Portlan cement kg 5.00 1,200.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

P. 09. Pasangan Geotekstil


a) Pemasangan geotekstil (1 m2)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.10 54,000.00
Tukang batu L.02 OH 0.02 66,000.00
Mandor L.04 OH 0.01 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Geotekstil m2 1.05 40,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

A.3.4.2. Membuat ditempat 1m2 bekesting untuk lantai


B.21. 1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm (tanpa perancah)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.20 54,000.00
Tukang kayu L.02 OH 0.10 68,000.00
Kepala tukang L.03 OH 0.01 69,000.00
Mandor L.04 OH 0.02 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Multiflex 12 mm lbr 0.128 174,200.00
Kaso 5/7 kayu meranti m3 0.005 5,700,000.00
Paku 5 cm dan 7 cm kg 0.220 21,000.00
Minyak bekisting ltr 0.200 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

128
CATATAN: * Bahan digunakan berulang kali, yang ke-1, koefisien 0,353 (multiflex) dan 0,014 (Kaso)
yang ke-2, koefisien menjadi 0,203 (multiflex) dan 0,008 (Kaso)
yang ke-3, koefisien menjadi 0,128 (multiflex) dan 0,005 (Kaso)
yang ke-4, koefisien menjadi 0,091 (multiflex) dan 0,003 (Kaso)

129
B.21. 1 m2 bekisting untuk permukaan beton biasa dengan papan ukuran 3/20 cm (tanpa perancah)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)

A TENAGA
Pekerja L.01 OH 0.3 54,000.00
Tukang kayu L.02 OH 0.15 68,000.00
Kepala tukang L.03 OH 0.015 69,000.00
Mandor L.04 OH 0.03 71,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan 3/20 cm kayu sengon bh 0.014 2,500,000.00
Kaso 5/7 kayu meranti m3 0.003 5,700,000.00
Paku 5 cm dan 7 cm kg 0.300 21,000.00
Minyak bekisting ltr 0.200 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)

CATATAN: * Bahan digunakan berulang kali, yang ke-1, koefisien 0,036 (papan) dan 0,008 (Kaso)
yang ke-2, koefisien menjadi 0,022 (papan) dan 0,004 (Kaso)
yang ke-3, koefisien menjadi 0,014 (papan) dan 0,003 (Kaso)
yang ke-4, koefisien menjadi 0,011 (papan) dan 0,002 (Kaso)

130
astik bagor (sebesar karung beras 25 kg) uk. 43 cm x 65 cm (1 buah)

Jumlah
Harga
(Rp)

2,160.00
284.00
2,444.00

1,500.00
1,000.00
28,800.00
31,300.00

0.00

33,744.00
3,374.40
37,118.40

awat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat
agonal 80 x 100 mm;
Jumlah
Harga
(Rp)

61,560.00
24,320.00
17,550.00
21,158.00
124,588.00

286,000.00
302,000.00
588,000.00

0.00

712,588.00
71,258.80
783,846.80

awat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat
0 x 120 mm;
Jumlah
Harga
(Rp)

63,180.00
24,960.00
17,550.00
21,584.00
127,274.00

286,000.00
311,020.00

131
597,020.00

0.00

724,294.00
72,429.40
796,723.40

132
Jumlah
Harga
(Rp)

1,620.00
330.00
213.00
2,163.00

8,750.00

8,750.00

6,500.00
6,500.00

17,413.00
1,741.30
19,154.30

Jumlah
Harga
(Rp)

1,944.00
396.00
284.00
2,624.00

4,550.00
4,550.00

6,500.00
6,500.00

13,674.00
1,367.40
15,041.40

Jumlah
Harga
(Rp)

12,960.00
7,920.00
828.00
1,704.00
23,412.00

87,500.00
6,000.00
6,000.00
99,500.00

0.00

122,912.00

133
12,291.20
135,203.20

134
Jumlah
Harga
(Rp)

12,960.00
7,920.00
828.00
1,704.00
23,412.00

144,000.00
6,000.00
6,000.00
156,000.00

0.00

179,412.00
17,941.20
197,353.20

Jumlah
Harga
(Rp)

5,400.00
1,320.00
710.00
7,430.00

42,000.00
42,000.00

0.00

49,430.00
4,943.00
54,373.00

Jumlah
Harga
(Rp)

10,800.00
6,800.00
690.00
1,420.00
19,710.00

22,297.60
28,500.00
4,620.00
1,800.00
57,217.60

0.00

76,927.60
7,692.76
84,620.36

135
n beton biasa dengan papan ukuran 3/20 cm (tanpa perancah)
Jumlah
Harga
(Rp)

16,200.00
10,200.00
1,035.00
2,130.00
29,565.00

35,000.00
17,100.00
6,300.00
1,800.00
60,200.00

0.00

89,765.00
8,976.50
98,741.50

136

Anda mungkin juga menyukai