Spesifikasi Teknis

Konstruksi Fisik : Pembangunan Asrama Haji Palu

DAFTAR ISI

BAB I
PENJELASAN UMUM
A. PENJELASAN UMUM

I. URAIAN UMUM

1.1. PEKERJAAN .............................................................................................. I-1


1.2. BATASAN/PERATURAN .......................................................................... I-1
1.3. DOKUMEN KONTRAK ............................................................................... I-2

II. LINGKUP PEKERJAAN


2.1. KETERANGAN UMUM ............................................................................... I-3
2.2. URAIAN PEKERJAAN ................................................................................ I-3
2.3. SARANA DAN CARA KERJA ..................................................................... I-3
2.4. PEMBUATAN RENCANA JADUAL PELAKSANAAN ................................. I-4
2.5. KETENTUAN DAN SYARAT – SYARAT BAHAN ...................................... I-4

III. SITUASI DAN PERSIAPAN PEKERJAAN


3.1. SITUASI/LOKASI ........................................................................................ I-5
3.2. AIR DAN DAYA .......................................................................................... I-5
3.3. SALURAN PEMBUANGAN ........................................................................ I-6
3.4. KANTOR KONTRAKTOR, LOS DAN HALAMAN KERJA, GUDANG
DAN FASILITAS LAIN ................................................................................ I-6
3.5. KANTOR PENGAWAS (DIREKSI KEET) ................................................... I-6
3.6. PAGAR SEMENTARA ................................................................................ I-6
3.7. PAPAN NAMA PROYEK ............................................................................ I-7
3.8. PEMBERSIHAN HALAMAN ....................................................................... I-7
3.9. PERMUKAAN ATAS LANTAI ..................................................................... I-7
3.10. PAPAN BANGUNAN .................................................................................. I-7

BAB II
PERSYARATAN TEKNIS ARSITEKTUR

I. PEMBERSIHAN / PEMBONGKARAN DAN PENGUKURAN


1.1. PERMUKAAN ATAS LANTAI ..................................................................... II - 1
1.2. PEMBERSIHAN HALAMAN ....................................................................... II - 1
1.3. PAPAN BANGUNAN .................................................................................. II - 1

II. PEKERJAAN TANAH


2.1. PEMBENTUKAN PERMUKAAN TANAH (GRADING) ................................ II - 1
2.2. GALIAN TANAH .......................................................................................... II - 2
2.3. URUGAN TANAH ........................................................................................ II - 2
2.4. BENDA YANG DITEMUKAN ....................................................................... II - 2
2.5. URUGAN PASIR ......................................................................................... II - 2
Spesifikasi Teknis
Konstruksi Fisik : Pembangunan Asrama Haji Palu

III. PEKERJAAN PASANGAN DINDING BATA DAN BATA RINGAN


3.1. LINGKUP PEKERJAAN ............................................................................. II - 2
3.2. STANDAR / RUJUKAN .............................................................................. II - 3
3.3. PROSEDUR UMUM ................................................................................... II - 3
3.4. BAHAN-BAHAN ........................................................................................... II - 3
3.5. PELAKSANAAN PEKERJAAN .................................................................. II - 4

IV. PEKERJAAN ADUKAN DAN PLESTERAN


4.1. LINGKUP PEKERJAAN ............................................................................. II - 5
4.2. STANDAR /. RUJUKAN ............................................................................. II - 6
4.3. PROSEDUR UMUM .................................................................................... II - 6
4.4. BAHAN ....................................................................................................... II - 6
4.5. PELAKSANAAN PEKERJAAN .................................................................. II - 7

V. PEKERJAAN KUSEN, PINTU DAN JENDELA


5.1. KETERANGAN ........................................................................................... II - 8
5.2. STANDAR DAN RUJUKAN ........................................................................ II - 8
5.2.1. SNI .................................................................................................. II - 8
5.2.2. BS ................................................................................................... II - 8
5.2.3. ASTM .............................................................................................. II - 9
5.2.4. AAMA .............................................................................................. II - 9
5.2.5. JIS ................................................................................................... II - 9
5.3. DESKRIPSI SISTEM .................................................................................. II - 9
5.3.1. KRITERIA PERENCANAAN .......................................................... II - 9
5.3.2. PERGERAKAN KARENA TEMPERATUR .................................... II - 9
5.3.3. PERSYARATAN STRUKTUR.......................................................... II - 9
5.3.4. KEBOCORAN UDARA .................................................................... II - 9
5.3.5. KEBOCORAN AIR ........................................................................... II - 9
5.4. PROSEDUR UMUM ................................................................................... II - 9
5.4.1. CONTOH BAHAN DAN DATA TEKNIS ......................................... II - 9
5.4.2. SPESIFIKASI TEKNIS ................................................................... II - 10
5.4.3. BIAYA PENGADAAN CONTOH ...................................................... II - 10
5.4.4. GAMBAR DETAIL PELAKSANAAN .............................................. II - 10
5.4.5. PENGIRIMAN DAN PENYIMPANAN ............................................ II - 10
5.4.6. GARANSI ....................................................................................... II - 10
5.5. BAHAN ....................................................................................................... II - 11
5.5.1. ALUMUNIUM ................................................................................. II - 11
5.5.2. ALAT PENGENCANG DAN AKSESORIS ..................................... II - 11
5.5.3. KACA DAN NEOPRENE / GASKET .............................................. II - 11
5.5.4. PERLENGKAPAN PINTU DAN JENDELA .................................... II - 11
5.5.5. SEALANT DINDING ...................................................................... II - 11
5.5.6. SCREW ......................................................................................... II - 11
5.5.7. JOINT SEALER ............................................................................. II - 11
5.6. PELAKSANAAN PEKERJAAN .................................................................. II - 11
5.6.1. FABRIKASI .................................................................................... II - 11
5.6.2. PEMASANGAN .............................................................................. II - 12
5.7. PINTU BESI ............................................................................................... II - 12

VI. PEKERJAAN KACA


6.1. LINGKUP PEKERJAAN ............................................................................ II – 13
6.2. STANDAR / RUJUKAN ............................................................................. II - 13
6.3. PROSEDUR UMUM .................................................................................. II - 13
Spesifikasi Teknis
Konstruksi Fisik : Pembangunan Asrama Haji Palu

6.3.1. CONTOH BAHAN DAN DATA TEKNIS ......................................... II - 13


6.3.2. PENGIRIMAN DAN PENYIMPANAN ............................................ II - 13
6.3.3. BAHAN ............................................................................................ II - 13
6.4. PELAKSANAAN PEKERJAAN .................................................................. II - 14
6.4.1. UMUM ............................................................................................ II - 14
6.4.2. PEMASANGAN KACA ................................................................... II - 14

VII. PEKERJAAN ALAT PENGGANTUNG DAN PENGUNCI


7.1. LINGKUP PEKERJAAN ............................................................................ II - 15
7.2. STANDAR / RUJUKAN ............................................................................. II - 15
7.3. PROSEDUR UMUM .................................................................................. II - 15
7.3.1. CONTOH ....................................................................................... II - 15
7.3.2. PENGIRIMAN DAN PENYIMPANAN ............................................ II - 15
7.3.3. KETIDAKSESUAIAN ....................................................................... II - 15
7.4. BAHAN ...................................................................................................... II - 15
7.4.1. UMUM ............................................................................................ II - 15
7.4.2. ALAT PENGGANTUNG DAN PENGUNCI .................................... II - 16
7.5. PELAKSANAAN PEKERJAAN ................................................................. II - 17
7.5.1. UMUM ............................................................................................ II - 17
7.5.2. PEMASANGAN PINTU .................................................................. II - 17
7.5.3. PEMASANGAN JENDELA ............................................................ II - 18

VIII. PEKERJAAN PENUTUP DAN PENGISI CELAH


8.1. LINGKUP PEKERJAAN ............................................................................ II - 18
8.2. STANDAR / RUJUKAN ............................................................................... II - 18
8.3. PROSEDUR UMUM .................................................................................. II - 18
8.3.1. CONTOH BAHAN DAN DATA TEKNIS ......................................... II - 18
8.3.2. PENGIRIMAN DAN PENYIMPANAN ............................................ II - 18
8.4. BAHAN ........................................................................................................ II - 18
8.4.1. TIPE UMUM ................................................................................... II - 18
8.4.2. TIPE STRUKTURAL ...................................................................... II - 18
8.4.3. TIPE AKRILIK ................................................................................ II - 19
8.5. PELAKSANAAN PEKERJAAN ................................................................... II - 19
8.5.1. PERSIAPAN .................................................................................. II - 19
8.5.2. DESAIN PERTEMUAN .................................................................. II - 19
8.5.3. CARA PENGAPLIKASIAN ............................................................. II - 19
8.5.4. LAPISAN PELINDUNG .................................................................. II - 19
8.5.5. LAPISAN KEDAP AIR .................................................................... II - 19

IX. PEKERJAAN RAILING


9.1. LINGKUP PEKERJAAN ............................................................................ II - 19
9.2. STANDAR / RUJUKAN ............................................................................. II - 20
9.3. PROSEDUR UMUM .................................................................................. II - 20
9.3.1. CONTOH BAHAN DAN SERTIFIKAT PABRIK ............................. II - 20
9.3.2. GAMBAR DETAIL PELAKSANAAN .............................................. II - 20
9.3.3. PENGIRIMAN DAN PENYIMPANAN ............................................ II - 20
9.3.4. KETIDAKSESUAIAN ..................................................................... II - 20
9.4. BAHAN ...................................................................................................... II - 20
9.4.1. UMUM .............................................................................................. II - 20
9.5. PELAKSANAAN ........................................................................................ II - 21
9.5.1. UMUM .............................................................................................. II - 21
Spesifikasi Teknis
Konstruksi Fisik : Pembangunan Asrama Haji Palu

X. PEKERJAAN LANGIT – LANGIT GYPSUM BOARD


10.1. KETERANGAN .......................................................................................... II - 21
10.2. LINGKUP PEKERJAAN ............................................................................ II - 21
10.3. STANDAR / RUJUKAN ............................................................................. II - 21
10.4. PROSEDUR UMUM .................................................................................. II - 22
10.4.1. CONTOH BAHAN DAN DATA TEKNIS ......................................... II - 22
10.4.2. GAMBAR DETAIL PELAKSANAAN .............................................. II - 22
10.4.3. PENGIRIMAN DAN PENYIMPANAN ............................................ II - 22
10.4.4. KETIDAKSESUAIAN ..................................................................... II - 22
10.5. BAHAN ...................................................................................................... II - 22
10.5.1. PEMASANGAN GYPSUM ............................................................. II - 22
10.6. PELAKSANAAN PEKERJAAN ................................................................. II - 23
10.6.1. UMUM ............................................................................................ II - 23
10.6.2. PEMASANGAN .............................................................................. II - 23
10.6.3. PENGECATAN .............................................................................. II - 23

XI. PEKERJAAN PELAPISAN DINDING


11.1. KETERANGAN .......................................................................................... II - 23
11.2. PELAPIS DINDING KERAMIK .................................................................. II - 23
11.2.1. LINGKUP PEKERJAAN ................................................................ II - 23
11.2.2. STANDAR / RUJUKAN ................................................................. II - 24
11.2.3. PROSEDUR UMUM ...................................................................... II - 24
11.2.4. BAHAN .......................................................................................... II - 24
11.2.5. PELAKSANAAN PEKERJAAN ...................................................... II - 25
11.3. PEKERJAAN BATU ALAM ........................................................................ II - 26
11.3.1. LINGKUP PEKERJAAN ................................................................ II - 26
11.3.2. STANDAR / RUJUKAN ................................................................. II - 26
11.3.3. PROSEDUR UMUM ...................................................................... II - 26
11.3.4. BAHAN .......................................................................................... II - 26
11.3.5. PELAKSANAAN PEKERJAAN ...................................................... II - 27
11.4. PELAPIS DINDING EKSTERNAL ALUMUNIUM COMPOSITE PANEL ... II - 27

XII. PEKERJAAN PENUTUP LANTAI


12.1 UBIN KERAMIK ......................................................................................... II - 30
12.1.1 LINGKUP PEKERJAAN ................................................................ II - 30
12.1.2 STANDAR / RUJUKAN ................................................................. II - 30
12.1.3 PROSEDUR UMUM ...................................................................... II - 31
12.1.4 BAHAN .......................................................................................... II - 31
12.1.5 PELAKSANAAN PEKERJAAN ...................................................... II - 32
12.2 FLOOR HARDENER ................................................................................. II - 33
12.2.1 LINGKUP PEKERJAAN ................................................................ II - 33
12.2.2 STANDAR / RUJUKAN ................................................................. II - 33
12.2.3 PROSEDUR UMUM ...................................................................... II - 33
12.2.4 BAHAN .......................................................................................... II - 33
12.2.5 PELAKSANAAN PEKERJAAN ...................................................... II - 33

XIII. PEKERJAAN PENGECATAN


13.1. KETERANGAN .......................................................................................... II - 34
13.2. LINGKUP PEKERJAAN ........................................................................... II - 34
13.3. STANDAR / RUJUKAN ............................................................................. II - 34
13.4. PROSEDUR UMUM .................................................................................. II - 34
13.4.1. DATA TEKNIS DAN KARTU WARNA ........................................... II - 34
13.4.2. CONTOH DAN PENGUJIAN ......................................................... II - 35
Spesifikasi Teknis
Konstruksi Fisik : Pembangunan Asrama Haji Palu

13.5. BAHAN ...................................................................................................... II - 35


13.5.1. UMUM ............................................................................................ II - 35
13.5.2. CAT DASAR .................................................................................. II - 35
13.5.3. UNDERCOAT ................................................................................ II - 35
13.5.4. CAT AKHIR .................................................................................... II - 35
13.6. PELAKSANAAN PEKERJAAN ................................................................. II - 36
13.6.1. PEMBERSIHAN, PERSIAPAN & PERAWATAN AWAL ................ II - 36
13.6.2. SELANG WAKTU ANTARA PERSIAPAN & PENGECATAN ........ II - 37
13.6.3. PELAKSANAAN PENGECATAN ................................................... II - 37
13.7. LAPISAN TRANSPARAN (MELAMIC) ..................................................... II - 38
13.7.1. LINGKUP PEKERJAAN ................................................................ II - 38
13.7.2. STANDAR / RUJUKAN ................................................................. II - 39
13.7.3. PROSEDUR UMUM ..................................................................... II - 39
13.7.4. BAHAN ......................................................................................... II - 39
13.7.5. PELAKSANAAN PEKERJAAN .................................................... II - 40

XIV. PEKERJAAN PERABOT TETAP DAN KELENGKAPAN INTERIOR


14.1. PEKERJAAN PERABOT TETAP ............................................................... II - 41
14.1.1. LINGKUP PEKERJAAN ................................................................ II - 41
14.1.2. STANDAR / RUJUKAN ................................................................. II - 41
14.1.3. PROSEDUR UMUM ..................................................................... II - 41
14.1.4. BAHAN ......................................................................................... II - 41
14.1.5. PELAKSANAAN PEKERJAAN .................................................... II - 42
14.2. PEKERJAAN KELENGKAPAN INTERIOR LAINNYA ............................... II - 43

XV. PEKERJAAN ALAT – ALAT SANITAIR DAN ASESORISNYA


15.1. PEKERJAAN SANITAIR ............................................................................ II - 43
15.1.1. LINGKUP PEKERJAAN ................................................................ II - 43
15.1.2. BAHAN ......................................................................................... II - 43
15.1.3. PELAKSANAAN PEKERJAAN .................................................... II - 44
15.2. ASESORIS DAERAH BASAH ................................................................... II - 45
15.2.1. LINGKUP PEKERJAAN ................................................................ II - 45
15.2.2. STANDAR / RUJUKAN ................................................................. II - 45
15.2.3. PROSEDUR UMUM ..................................................................... II - 45
15.2.4. BAHAN ......................................................................................... II - 45
15.2.5. PELAKSANAAN PEKERJAAN .................................................... II - 45

XVI. PEKERJAAN PENUTUP ATAP


16.1. ATAP DAK BETON .................................................................................... II - 46
16.2. PENUTUP ATAP GENTENG ASPAL ....................................................... II - 47

XVII. PEKERJAAN ORNAMEN ISLAMI

XVIII. PEKERJAAN SITE DEVELOPMENT


18.1 UMUM ......................................................................................................... II - 48
18.2 PERTAMANAN ............................................................................................ II - 49
18.3 PERKERASAN JALAN SIRKULASI ............................................................ II - 51
18.4 PEKERJAAN JALAN ................................................................................... II - 52
18.5 PROSEDUR UMUM ................................................................................. II - 56
18.6 PENGUKURAN DAN PEMBAYARAN ....................................................... II - 57
18.7 TIMBUNAN .................................................................................................. II - 59
18.7.1. UMUM ............................................................................................ II - 59
18.7.2. BAHAN ........................................................................................... II - 62
Spesifikasi Teknis
Konstruksi Fisik : Pembangunan Asrama Haji Palu

18.7.3. PENGHAMPARAN DAN PEMADATAN TIMBUNAN ..................... II - 63


18.7.4. JAMINAN MUTU ............................................................................ II - 65
18.7.5. PENGUKURAN DAN PEMBAYARAN............................................ II - 66
18.8 PENYIAPAN BADAN JALAN....................................................................... II - 67
18.8.1. UMUM ............................................................................................ II - 67
18.8.2. BAHAN ........................................................................................... II - 67
18.8.3. PELAKSANAAN DAN PENYIAPAN BADAN JALAN ..................... II - 67
18.8.4. PENGUKURAN .............................................................................. II - 69

BAB III
PERSYARATAN TEKNIS STRUKTUR

3.1. URAIAN PEKERJAAN DAN SITUASI ........................................................ III - 1


3.2. UKURAN TINGGI DAN UKURAN POKOK ................................................. III - 1
3.3. PEKERJAAN PEMBERSIHAN DAN PEMBONGKARAN ........................... III - 1
3.4. OBSTACLE ................................................................................................. III - 2
3.5. PEKERJAAN PONDASI KSLL
3.5.1. PEKERJAAN GALIAN TANAH ........................................................ III - 2
3.5.2. PEKERJAAN LANTAI KERJA UNTUK RIB ..................................... III - 3
3.5.3. PEKERJAAN ACUAN UNTUK RIB.................................................. III - 3
3.5.4. PEKERJAAN P0EMBESIAN UNTUK RIB ....................................... III - 3
3.5.5. PEKERJAAN PENGECORAN BETON UNTUK RIB ....................... III - 3
3.5.6. PEKERJAAN URUGAN TANAH DAN PEMADATAN ...................... III - 4
3.5.7. PEKERJAAN URUGAN PASIR DAN PEMADATAN ....................... III - 5
3.5.8. PEKERJAAN LANTAI KERJA UNTUK PLAT PENUTUP ................ III - 5
3.5.9. PEKERJAAN PEMBESIAN UNTUK PLAT PENUTUP ................... III - 5
3.5.10. PEKERJAAN PENGECORAN BETON PLAT PENUTUP................ III - 5
3.6. PEKERJAAN BETON .................................................................................. III - 5
3.7. PEMBESIAN ............................................................................................... III - 24
3.8. PELAKSANAAN PEMASANGAN TULANGAN,PEMBENGKOKAN ............ III - 26
3.9. PEKERJAAN CETAKAN DAN PERANCAH ................................................ III - 29
3.10. PEKERJAAN KHUSUS STRUKTUR ATAS ................................................. III - 40
3.11. PEKERJAAN KEDAP AIR / WATERPROOFING ........................................ III - 52
3.12. PEKERJAAN PELAKSANAAN / SHOP DRAWING ..................................... III - 52
3.13. PENYELESAIAN DARI BETON PLAT (CONCRETE SLAB FINISHES) ..... III - 53
3.14. PEKERJAAN STRUKTUR RANGKA ATAP ................................................ III - 54
3.15. PEKERJAAN KEDAP AIR / WATERPROOFING ........................................ III - 57

BAB IV
PERSYARATAN TEKNIS MEKANIKAL,
ELERKTRIKAL & PLUMBING
01.00.0. PERSYARATAN TEKNIS PEKERJAAN AIR BERSIH, AIR KOTOR &
AIR PANAS
01.01.0. LINGKUP PEKERJAAN ..................................................................... IV - 1
01.02.0. KETENTUAN TEKNIS PEKERJAAN PLAMBING .............................. IV - 3
01.03.0. PERSYARATAN PEMASANGAN PIPA ............................................. IV - 7
01.03.01. UMUM ............................................................................................ IV - 7
01.03.02. PENGGANTUNG DAN PENUNJANG PIPA .................................. IV - 9
01.03.03. CARA PEMASANGAN PIPA AIR LIMBAH DALAM TANAH.......... IV - 10
Spesifikasi Teknis
Konstruksi Fisik : Pembangunan Asrama Haji Palu

01.03.04. PEMASANGAN KATUP-KATUP ................................................... IV - 10


01.03.05. PEMASANGAN STRAINER .......................................................... IV - 10
01.03.06. PEMASANGAN KATUP-KATUP PELEPASAN TEKANAN ........... IV - 11
01.03.07. PEMASANGAN KATUP-KATUP PENGAMAN .............................. IV - 11
01.03.08. PEMASANGAN VEN UDARA OTOMATIS .................................... IV - 11
01.03.09. PEMASANGAN KATUP-KATUP PENGURANGAN TEKANAN .... IV - 11
01.03.10. PEMASANGAN SAMBUNGAN FLEKSIBEL ................................. IV - 11
01.03.11. PEMASANGAN PENGUKUR TEKANAN ...................................... IV - 11
01.03.12. PENYAMBUNGAN PIPA-PIPA ...................................................... IV - 11
01.04.0. PENGECATAN ................................................................................... IV - 12
01.05.0. LABEL KATUP (VALVE TAG ............................................................. IV - 13
01.06.0. KETENTUAN PELAKSANAAN PEKERJAAN LISTRIK...................... IV - 13
01.07.0. KETENTUAN PENGUJIAN PEKERJAAN .......................................... IV - 13
01.08.0. KETENTUAN TEKNIS BAHAN DAN PERALATAN............................ IV - 14

02.00.0. PERSYARATAN TEKNIS PEKERJAAN PEMADAM KEBAKARAN


02.01.0. LINGKUP PEKERJAAN ..................................................................... IV - 21
02.01.01. PEKERJAAN PEMBORONG ......................................................... IV - 21
02.01.02. LINGKUP PEKERJAAN PEMADAM KEBAKARAN ....................... IV - 21
02.01.03. LINGKUP PEKERJAAN PEMBORONG LAIN ............................... IV - 22
02.02.0. KETENTUAN TEKNIS PEKERJAAN PEMADAM KEBAKARAN ....... IV - 22
02.02.01. KETENTUAN TEKNIS POMPA ..................................................... IV - 22
02.02.02. KETENTUAN TEKNIS PIPA .......................................................... IV - 24
02.02.03. KETENTUAN TEKNIS ALAT PEMADAM ...................................... IV - 24
02.02.04. KETENTUAN TEKNIS PERALATAN BANTU PEMIPAAN ............ IV - 25
02.02.05. KETENTUAN TEKNIS ALAT KONTROL OPERASI ...................... IV - 26
02.03.0. PERSYARATAN PEMASANGAN ...................................................... IV - 26
02.04.0. PENGECATAN ................................................................................... IV - 30
02.05.0. LABEL KATUP (VALVE TAG) ............................................................ IV - 30
02.06.0. KETENTUAN PELAKSANAAN PEKERJAAN LISTRIK...................... IV - 31
02.07.0. KETENTUAN PENGUJIAN PEKERJAAN .......................................... IV - 31
02.08.0. SPESIFIKASI BAHAN DAN PERALATAN ......................................... IV - 32

03.00.0. PERSYARATAN TEKNIS PEKERJAAN TATA UDARA


03.01.0. LINGKUP PEKERJAAN ..................................................................... IV - 37
03.01.01. LINGKUP PEKERJAAN PEMBORONG ........................................ IV - 37
03.01.02. LINGKUP PEKERJAAN TATA UDARA (AIR CONDITIONING, AC)
....................................................................................................... IV - 37
03.01.03. LINGKUP PEKERJAAN PEMBORONG LAIN ............................... IV - 38
03.02.0. KETENTUAN TEKNIS PEKERJAAN TATA UDARA ........................ IV - 38
03.02.01. KONDISI OPERASI ....................................................................... IV - 38
03.02.02. Ketentuan Teknis Out-Door Unit (Condensing Unit) ...................... IV - 38
03.02.03. Ketentuan Teknis Fan Coil Unit (FCU, Indoor Unit) ....................... IV - 40
03.02.04. Ketentuan Teknis Fan .................................................................... IV - 41
03.03.0. DUCTING ........................................................................................... IV - 41
03.03.01. Ketentuan Teknis Cerobong Saluran Udara (Jika ada) ................. IV - 41
03.03.02. Ketentuan Teknis Pelaksanaan Pekerjaan Ducting ....................... IV - 44
03.03.03. Ketentuan Teknis Bahan Isolasi Ducting ....................................... IV - 44
03.04.0. PEMIPAAN ......................................................................................... IV - 44
03.04.01. Ketentuan Teknis Pemipaan .......................................................... IV - 44
03.04.02. Ketentuan Teknis Pelaksanaan Pekerjaan Pemipaan ................... IV - 44
03.04.03. Ketentuan Teknis Pengujian Pekerjaan Pemipaan ....................... IV - 48
03.05.0. KETENTUAN TEKNIS PEKERJAAN LISTRIK ................................... IV - 49
Spesifikasi Teknis
Konstruksi Fisik : Pembangunan Asrama Haji Palu

03.05.01. Ketentuan Teknis Pekerjaan Inverter (Variabel Speed Drive) VRV


....................................................................................................... IV - 49
03.05.02. Ketentuan Teknis Panel Tegangan Rendah .................................. IV - 49
03.05.03. Ketentuan Teknis Kabel Listrik ...................................................... IV - 51
03.05.04. Ketentuan Teknis Pipa Pelindung Kabel ....................................... IV - 52
03.05.05. Ketentuan Teknis Rak dan Tangga Kabel ..................................... IV - 53
03.05.06. Ketentuan Teknis Peralatan Bantu ................................................ IV - 54
03.06.0. KETENTUAN TEKNIS PENGECATAN .............................................. IV - 54
03.07.0. KETENTUAN TEKNIS PENGUJIAN (TESTING) ADJUSTING DAN
BALANCING (TAB) HASIL PELAKSANAN ........................................ IV - 55
03.08.0. KETENTUAN TEKNIS BAHAN DAN PERALATAN............................ IV - 56

04.00.0. PERSYARATAN TEKNIS PEKERJAAN LISTRIK


04.01.0. LINGKUP PEKERJAAN ..................................................................... IV - 58
04.01.01. Lingkup Pekerjaan Pemborong ..................................................... IV - 58
04.01.02. Lingkup Pekerjaan Listrik ............................................................... IV - 58
04.01.03. Lingkup Pekerjaan Pemborong Lain .............................................. IV - 59
04.02.0. KETENTUAN TEKNIS PEKERJAAN LISTRIK ................................... IV - 59
04.02.01. Kondisi Operasi ............................................................................. IV - 59
04.02.02. Ketentuan Teknis Pekerjaan Tegangan Menengah ...................... IV - 60
04.02.03. Ketentuan Teknis Pekerjaan Diesel Generator Set ....................... IV - 61
04.02.04. Ketentuan Teknis Panel Tegangan Rendah .................................. IV - 65
04.02.05. Ketentuan Teknis Kabel Listrik ...................................................... IV - 66
04.02.06. Ketentuan Teknis Lampu Penerangan .......................................... IV - 67
04.02.07. Ketentuan Teknis Pipa Pelindung Kabel ....................................... IV - 68
04.02.08. Ketentuan Teknis Rak dan Tangga Kabel ..................................... IV - 69
04.02.09. Ketentuan Teknis Saklar dan Kotak Kontak .................................. IV - 70
04.02.10. Ketentuan Teknis Penangkal Petir ................................................ IV - 71
04.02.11. Ketentuan Teknis Pentanahan ...................................................... IV - 72
04.02.12. Ketentuan Teknis Peralatan Bantu ................................................ IV - 72
04.03.0. KETENTUAN TEKNIS SISTEM VENTILASI RUANG ........................ IV - 73
04.04.0. KETENTUAN TEKNIS PIPA BAHAN BAKAR .................................... IV - 73
04.05.0. KETENTUAN TEKNIS PEREDAM SUARA ........................................ IV - 74
04.06.0. KETENTUAN TEKNIS PELAKSANAAN PEKERJAAN ...................... IV - 74
04.07.0. KETENTUAN TEKNIS PENGUJIAN PEKERJAAN ............................ IV - 78
04.08.0. SPESIFIKASI BAHAN DAN PERALATAN ......................................... IV - 79

05.00.0. PERSYARATAN TEKNIS PEKERJAAN TANDA BAHAYA KEBAKARAN


05.01.0. LINGKUP PEKERJAAN ..................................................................... IV - 85
05.01.01. Lingkup Pekerjaan Pemborong ..................................................... IV - 85
05.01.02. Lingkup Pekerjaan Tanda Bahaya Kebakaran .............................. IV - 85
05.01.03. Lingkup Pekerjaan Pemborong Lain .............................................. IV - 87
05.02.0. KETENTUAN TEKNIS PEKERJAAN TANDA BAHAYA KEBAKARAN
........................................................................................................... IV - 87
05.02.01. Kondisi Operasi ............................................................................. IV - 87
05.02.02. Ketentuan Teknis Panel Kontro ..................................................... IV - 87
05.02.03. Ketentuan Teknis Detektor ............................................................ IV - 89
05.02.04. Ketentuan Teknis Bel Tanda Bahaya Kebakaran .......................... IV - 89
05.02.05. Ketentuan Teknis Lampu Indikator ................................................ IV - 90
05.03.0. KETENTUAN TEKNIS KABEL ........................................................... IV - 90
05.04.0. KETENTUAN TEKNIS PIPA PELINDUNG KABEL ............................ IV - 90
Spesifikasi Teknis
Konstruksi Fisik : Pembangunan Asrama Haji Palu

05.05.0. KETENTUAN TEKNIS PERALATAN BANTU PENGKABELAN......... IV - 91


05.06.0. KETENTUAN TEKNIS PELAKSANAAN PEKERJAAN TANDA BAHAYA
KEBAKARAN...................................................................................... IV - 91
05.07.0. KETENTUAN PENGUIJIAN PEKERJAAN TANDA BAHAYA KEBAKARAN
........................................................................................................... IV - 93
05.08.0. KETENTUAN TEKNIS BAHAN DAN PERALATAN............................ IV - 93

06.00.0. PERSYARATAN TEKNIS PEKERJAAN TELEKOMUNIKASI DATA & INTERNET


06.01.0. LINGKUP PEKERJAA ........................................................................ IV - 94
06.01.01. Linggkup Pekerjaan Pemborong ................................................... IV - 94
06.01.02. Linggkup Pekerjaan Telekomunikas .............................................. IV - 94
06.01.03. Lingkup Pekerjaan Pemborong Lain .............................................. IV - 94
06.02.0. KETENTUAN TEKNIS PEKERJAAN TELEKOMUNIKASI ................. IV - 95
06.02.01. Kondisi Operasi ............................................................................. IV - 95
06.02.02. Ketentuan Teknis Sentral Telepon ................................................ IV - 95
06.02.03. Kemampuan Operasi Sistem Telepon ........................................... IV - 96
06.02.04. Ketentuan Teknis Pesawat Telepon .............................................. IV - 97
06.02.05. Ketetuan Teknis Kotak Hubung ..................................................... IV - 98
06.02.06. Ketentuan Teknis Kabel ................................................................ IV - 98
06.02.07. Ketentuan Teknis Pipa Pelindung Kabel ....................................... IV - 98
06.02.08. Ketentuan Teknis Rak Kabel ......................................................... IV - 99
06.03.0. KETENTUAN TEKNIS PELAKSANAAN PEKERJAAN ...................... IV - 100
06.04.0. KETENTUAN TEKNIS PENGUJIAN PEKERJAAN ............................ IV - 100
06.05.0. KETENTUAN TEKNIS BAHAN DAN PERALATAN............................ IV - 101

07.00.0. PERSYARATAN TEKNIS PEKERJAAN TATA SUARA


07.01.0. LINGKUP PEKERJAAN ..................................................................... IV - 102
07.01.01. Lingkup Pekerjaan Pemborong ..................................................... IV - 102
07.01.02. Lingkup Pekerjaan Tata Suara ...................................................... IV - 102
07.01.03. Lingkup Pekerjaan Pemborong Lain .............................................. IV - 103
07.02.0. KETENTUAN TEKNIS PEKERJAAN TATA SUARA .......................... IV - 103
07.02.01. Kondisi Operasi ............................................................................. IV - 103
07.02.02. Ketentuan Teknis Peralatan Utama ............................................... IV - 103
07.02.03. Ketentuan Teknis Kabel Penghantar ............................................. IV - 105
07.02.04. Ketentuan Teknis Pipa Pelindung Kabel ....................................... IV - 105
07.02.05. Ketentuan Teknis Peralatan Lainnya ............................................. IV - 106
07.03.0. KETENTUAN TEKNIS PELAKSANAAN PEKERJAAN ...................... IV - 107
07.04.0. KETENTUAN TEKNIS PENGUJIAN PEKERJAAN ............................ IV - 108
07.05.0. KETENTUAN TEKNIS BAHAN DAN PERALATAN............................ IV - 108

08.00.0. PERSYARATAN TEKNIS PEKERJAAN CCTV


08.01.0. LINGKUP PEKERJAAN ..................................................................... IV - 109
08.01.01. Lingkup Pekerjaan Pemborong ..................................................... IV - 109
08.01.02. Lingkup Pekerjaan CCTV .............................................................. IV - 109
08.01.03. Lingkup Pekerjaan Pemborong Lain .............................................. IV - 109
08.02.0. KETENTUAN TEKNIS PEKERJAAN CCTV ....................................... IV - 110
08.02.01. Kondisi Operasi ............................................................................. IV - 110
08.02.02. Ketentuan Teknis Peralatan Utama ............................................... IV - 110
08.02.03. Peralatan Initiating Device ............................................................. IV - 110
08.02.04. Video Recorder .............................................................................. IV - 111
08.02.05. Camera .......................................................................................... IV - 111
08.02.06. Lens ............................................................................................... IV - 111
08.02.07. Housing camera ............................................................................. IV - 112
Spesifikasi Teknis
Konstruksi Fisik : Pembangunan Asrama Haji Palu

08.02.08. Monitoring Bracket ......................................................................... IV - 112


08.03.01. Ketentuan Teknis Kabel Penghantar ............................................. IV - 112
08.03.02. Ketentuan Teknis Pipa Pelindung Kabel ....................................... IV - 112
08.03.03. Ketentuan Teknis Peralatan Lainnya ............................................. IV - 113
08.04.0. KETENTUAN TEKNIS PELAKSANAAN PEKERJAAN ...................... IV - 114
08.05.0. KETENTUAN TEKNIS PENGUJIAN PEKERJAAN ............................ IV - 115
08.06.0. KETENTUAN TEKNIS BAHAN DAN PERALATAN............................ IV - 115

09.00.0. PERSYARATAN TEKNIS PEKERJAAN MATV ................................ IV - 116


09.01.0. LINGKUP PEKERJAAN ..................................................................... IV - 116
09.01.01. Lingkup Pekerjaan Pemborong ..................................................... IV - 116
09.01.02. Lingkup Pekerjaan MATV .............................................................. IV - 116
09.01.03. Lingkup Pekerjaan Pemborong Lain .............................................. IV - 116
09.02.0. KETENTUAN TEKNIS PEKERJAAN MATV....................................... IV - 117
09.02.01. Kondisi Operasi ............................................................................. IV - 117
09.02.02. Ketentuan Teknis Peralatan Utama ............................................... IV - 117
09.02.03. Ketentuan Teknis Kabel Penghantar ............................................. IV - 117
09.02.04. Ketentuan Teknis Pipa Pelindung Kabel ....................................... IV - 118
09.02.05. Ketentuan Teknis Peralatan Lainnya ............................................. IV - 119
09.03.0. KETENTUAN TEKNIS PELAKSANAAN PEKERJAAN ...................... IV - 119
09.04.0. KETENTUAN TEKNIS PENGUJIAN PEKERJAAN ............................ IV - 121
09.05.0. KETENTUAN TEKNIS BAHAN DAN PERALATAN............................ IV - 121
10.00.0. PERSYARATAN TEKNIS PEKERJAAN ELEVATOR (LIFT) ........... IV - 122
10.01.0. LINGKUP PEKERJAAN ..................................................................... IV - 122
10.02.0. KETENTUAN TEKNIS UMUM ............................................................ IV - 123
10.03.0. KETENTUAN TEKNIS PEKERJAAN LISTRIK ................................... IV - 131
10.04.0. KETENTUAN TEKNIS PELAKSANAAN PEKERJAAN ...................... IV – 131
10.05.0. KETENTUAN TEKNIS PENGUJIAN PEKERJAAN ............................ IV - 132

BAB V
PENUTUP