3
Dinas Bina Marga dan Pengairan
I. BIAYA PERSONIL
Vol. Waktu Vol.x Waktu Harga Sat Biaya
No Uraian
(org/bh) (bln/kali) (org.bln/bh.kali) (Rp) (Rp)
1 PROFESIONAL STAFF
1.1 Site/Supervisor Engineer 1.00 2.00 2.00 8,760,000.00 17,520,000.00
2 SUB PROFESIONAL STAFF
2.1 Inspector/ Pengawas lapangan 2.00 2.00 4.00 7,900,000.00 31,600,000.00
JUMLAH BIAYA PERSONIL 49,120,000.00
1,400,000,000.00 0.04
56,000,000.00
CECEP RIKSAN, MT
NIP. 19631017 199601 1 002
KEGIATAN : MONITORING, EVALUASI DAN PELAPORAN (21.03)
PEKERJAAN : PENGAWASAN TEKNIK PRASARANA SUMBER DAYA AIR 1.8
LOKASI : KOTA BANDUNG
SUMBER DANA : APBD KOTA BANDUNG
TAHUN ANGGARAN : 2019
I. BIAYA PERSONIL
Vol. Waktu Vol.x Waktu Harga Sat
No Uraian
(org/bh) (bln/kali) (org.bln/bh.kali) (Rp)
1 PROFESIONAL STAFF
1.1 Site/Supervisor Engineer 1.00 1.00 1.00 11,450,000.00
2 SUB PROFESIONAL STAFF
2.1 Inspector/ Pengawas lapangan 4.00 1.00 4.00 8,760,000.00
JUMLAH BIAYA PERSONIL
Biaya
(Rp)
20,000.00
75,000.00
95,000.00
BIAYA
46,490,000.00
95,000.00
46,585,000.00
4,658,500.00
51,243,500.00
51,243,000.00
Agustus 2019
buat Komitmen
NAEN, ST, MM
4 199003 1 006