Harga Perkiraan Sendiri (HPS)
Harga Perkiraan Sendiri (HPS)
RENCANA ANGGA
JUMLAH
NO. POSISI BULAN BEBAN BIAYA PE
PERSONIL (Org)
ORANG (org)
1 2 3 4 5
RENCANA ANGGA
NO. POSISI JUMLAH ORANG
PERSONIL (Org) BEBAN BIAYA PE
HARI HARI (org)
1 2 3 4 5 6
1 Penelitian Tanah Ls Ls Ls Ls
1 Biaya Survey
Transportasi 1.00 3.00 unit
Konsumsi 4.00 3.00 org
Lumpsum/Insentif Tenaga Ahli 2.00 3.00 org 200
2 Biaya Operasional kantor
- ATK Bln 1.00 Bln
- Listrik dan Komunikasi Ls 1.00 Ls
- Peralatan Studio dan Perencana Ls 1.00 Ls
B.2 TRANSPORTASI/AKOMODASI
1 2 3 4 5 6
B.3PENGGANDAAN LAPORAN
4,500,000.00 4,500,000.00
4,000,000.00 4,000,000.00
4,000,000.00 4,000,000.00
###
200,000.00 2,000,000.00
150,000.00 2,250,000.00
100,000.00 1,500,000.00
5,750,000.00
RENCANA ANGGARAN BIAYA
JUMLAH BIAYA
HARGA SATUAN (Rp)
(Rp)
7 8
250,000.00 750,000.00
50,000.00 600,000.00
200,000.00 1,200,000.00
600,000.00 600,000.00
700,000.00 700,000.00
800,000.00 800,000.00
4,650,000.00
1,000,000.00 1,000,000.00
1,000,000.00
151,500.00 757,500.00
100,000.00 500,000.00
200,000.00 1,000,000.00
2,257,500.00
REKAPITULASI
HARGA PERKIRAAN SENDIRI (HPS)
Terbilang : Dua puluh delapan juta tujuh ratus tujuh puluh tiga ribu rupiah
IMRAN, SP A H D A R, SPd.I
Nip. 19601113 1897 021 003 Ketua