Anda di halaman 1dari 27

Analisa Harga Satuan Pekerjaan

Source : www.ilmutekniksipil.com

Pekerjaan :

Lokasi :

Tahun :

Harga Satuan (Rp)


Total Harga Satuan

No
Jenis Pekerjaan
Sat
Indeks

Bahan
Upah
(Rp)
I
PEKERJAAN PERSIAPAN

6.8
A. Pembersihan Lahan (m ²)
SNI 03-2835-2002
Tenaga

Pekerja
Oh
0.100

36,000.00
3,600.00

Mandor
Oh
0.050

40,000.00
2,000.00

Sub Total

5,600.00

6.1
B. Pemasangan Pagar Sementara dari Kayu tinggi 2 m (m ¹)
SNI 03-2835-2002
Bahan

Dolken Kayu Ø 8-10/400 cm


Btg
1.250
25,000.00

31,250.00

Semen Portland
Kg
2.500
1,050.00

2,625.00

Pasir Beton

0.005
125,000.00

625.00

Koral Beton

0.009
135,000.00

1,215.00

Kayu 5/7

0.072
1,700,000.00

122,400.00

Paku Biasa 2"-5"


Kg
0.060
10,000.00

600.00

Residu
Lt
0.400
11,000.00

4,400.00

Tenaga

Tukang Kayu
Oh
0.200
47,500.00
9,500.00

Pekerja
Oh
0.400

36,000.00
14,400.00

Kepala Tukang
Oh
0.020

45,000.00
900.00

Mandor
Oh
0.020

40,000.00
800.00

Sub Total

188,715.00

6.4
C. Memasang Bouwplank (m ¹)
SNI 03-2835-2002
Bahan

Kayu 5/7

0.012
1,700,000.00

20,400.00

Paku Biasa 2"-5"


Kg
0.020
10,000.00

200.00

Kayu Papan Bengkirai 3/20



0.007
3,541,666.00

24,791.66

Tenaga
Tukang Kayu
Oh
0.100

47,500.00
4,750.00

Pekerja
Oh
0.100

36,000.00
3,600.00

Kepala Tukang
Oh
0.010

45,000.00
450.00
Mandor
Oh
0.005

40,000.00
200.00

Sub Total

54,391.66
ALS
D. Memasang Papan Nama Proyek 80x120 cm (Bh)

Bahan
Kayu Meranti
Btg
0.035
1,687,000.00

59,045.00

Paku Biasa 2"-5"


Kg
0.600
10,000.00

6,000.00

Seng Lembaran 90 cm

1.400
27,000.00

37,800.00

Cat kayu
Kg
1.500
38,000.00

57,000.00

Semen Portland
Kg
16.800
1,050.00

17,640.00

Pasir Beton

0.027
125,000.00

3,375.00

Koral Beton

0.041
135,000.00

5,535.00

Tenaga

Tukang Kayu
Oh
1.000

47,500.00
47,500.00

Tukang Batu
Oh
0.018

42,500.00
765.00

Tukang Cat
Oh
1.000

42,500.00
42,500.00

Pekerja
Oh
2.100

36,000.00
75,600.00

Mandor
Oh
1.005

40,000.00
40,200.00

Sub Total

392,960.00
6.5
E. Membuat direksi keet & Gudang Sementara (m ²)

SNI 03-2835-2002
Bahan

Dolken Kayu Ø 8-10/400 cm


Btg
1.250
25,000.00

31,250.00
Kayu 5/7

0.180
1,700,000.00

306,000.00

Paku Biasa 2"-5"


Kg
0.850
10,000.00

8,500.00

Besi Strip
Kg
1.100
11,000.00

12,100.00

Semen Portland
Kg
35.000
1,050.00

36,750.00

Pasir Pasang

0.150
125,000.00

18,750.00

Pasir Beton

0.100
125,000.00

12,500.00
Koral Beton

0.150
135,000.00

20,250.00

Bata Merah
Bh
30.000
500.00

15,000.00

Seng Plat
Lbr
0.250
27,000.00

6,750.00

Jendela Nako
Bh
2.0000
12,500.00

25,000.00

Kaca Polos 3 mm

0.080
50,000.00

4,000.00

Kunci Tanam
Bh
0.150
25,000.00

3,750.00

Plywood 4 mm
Lbr
0.060
50,000.00

3,000.00

Tenaga

Tukang Kayu
Oh
2.000

47,500.00
95,000.00

Tukang Batu
Oh
1.000

42,500.00
42,500.00

Pekerja
Oh
2.000

36,000.00
72,000.00

Kepala Tukang
Oh
0.800

45,000.00
36,000.00
Mandor
Oh
0.050

40,000.00
2,000.00

Sub Total

751,100.00

II
PEKERJAAN TANAH

6.1
A. Galian Tanah Biasa sedalam 1 m (m ³)
SNI 03-2835-2002
Tenaga

Pekerja
Oh
0.400

36,000.00
14,400.00

Mandor
Oh
0.040

40,000.00
1,600.00

Sub Total

16,000.00
6.9
B. Urugan Kembali (m ³)

SNI 03-2835-2002
Tenaga
Pekerja
Oh
0.192

36,000.00
6,912.00

Mandor
Oh
0.019

40,000.00
760.00

Sub Total

7,672.00
6.11
C. Urugan Pasir Bawah Pondasi (m ³)

SNI 03-2835-2002
Bahan
Pasir Urug

1.200
100,000.00

120,000.00

Tenaga

Pekerja
Oh
0.300

36,000.00
10,800.00

Mandor
Oh
0.010

40,000.00
400.00

Sub Total

131,200.00

III
PEKERJAAN PONDASI
6.6
D. Pasangan Pondasi Batu Kali 1 Pc: 5 Ps (m ³)

SNI 03-2835-2002
Bahan

Batu Belah 15/20 cm



1.100
85,000.00

93,500.00

Semen Portland
Kg
136.000
1,050.00

142,800.00

Pasir Pasang

0.544
125,000.00

68,000.00

Tenaga
Pekerja
Oh
1.500

36,000.00
54,000.00

Tukang Batu
Oh
0.600

42,500.00
25,500.00

Kepala Tukang
Oh
0.060

45,000.00
2,700.00

Mandor
Oh
0.075

40,000.00
3,000.00

Sub Total

389,500.00
IV
PEKERJAAN DINDING

6.11
A. Pasangan Tembok ½ Bata 1Pc:4Ps (Trasraam) (m ²)

SNI 03-2835-2002
Bahan

Bata Merah 5 X 11 X 22 cm
Bh
70.000
500.00

35,000.00

Semen Portland
Kg
11.500
1,050.00

12,075.00

Pasir Pasang

0.043
125,000.00

5,375.00

Tenaga

Pekerja
Oh
0.320

36,000.00
11,520.00

Tukang Batu
Oh
0.100

42,500.00
4,250.00

Kepala Tukang
Oh
0.010

45,000.00
450.00

Mandor
Oh
0.015

40,000.00
600.00

Sub Total
69,270.00
Thank you for evaluating
BCL easyConverter Desktop
This Word document was converted from PDF with an evaluation
version of BCL easyConverter Desktop software that only
converts the first 3 pages of your PDF.
CTRL+ Click on the link below to purchase

Activate your software for less than $20


http://www.pdfonline.com/easyconverter/X

Anda mungkin juga menyukai