Source : www.ilmutekniksipil.com
Pekerjaan :
Lokasi :
Tahun :
No
Jenis Pekerjaan
Sat
Indeks
Bahan
Upah
(Rp)
I
PEKERJAAN PERSIAPAN
6.8
A. Pembersihan Lahan (m ²)
SNI 03-2835-2002
Tenaga
Pekerja
Oh
0.100
36,000.00
3,600.00
Mandor
Oh
0.050
40,000.00
2,000.00
Sub Total
5,600.00
6.1
B. Pemasangan Pagar Sementara dari Kayu tinggi 2 m (m ¹)
SNI 03-2835-2002
Bahan
31,250.00
Semen Portland
Kg
2.500
1,050.00
2,625.00
Pasir Beton
M³
0.005
125,000.00
625.00
Koral Beton
M³
0.009
135,000.00
1,215.00
Kayu 5/7
M³
0.072
1,700,000.00
122,400.00
600.00
Residu
Lt
0.400
11,000.00
4,400.00
Tenaga
Tukang Kayu
Oh
0.200
47,500.00
9,500.00
Pekerja
Oh
0.400
36,000.00
14,400.00
Kepala Tukang
Oh
0.020
45,000.00
900.00
Mandor
Oh
0.020
40,000.00
800.00
Sub Total
188,715.00
6.4
C. Memasang Bouwplank (m ¹)
SNI 03-2835-2002
Bahan
Kayu 5/7
M³
0.012
1,700,000.00
20,400.00
200.00
24,791.66
Tenaga
Tukang Kayu
Oh
0.100
47,500.00
4,750.00
Pekerja
Oh
0.100
36,000.00
3,600.00
Kepala Tukang
Oh
0.010
45,000.00
450.00
Mandor
Oh
0.005
40,000.00
200.00
Sub Total
54,391.66
ALS
D. Memasang Papan Nama Proyek 80x120 cm (Bh)
Bahan
Kayu Meranti
Btg
0.035
1,687,000.00
59,045.00
6,000.00
Seng Lembaran 90 cm
M¹
1.400
27,000.00
37,800.00
Cat kayu
Kg
1.500
38,000.00
57,000.00
Semen Portland
Kg
16.800
1,050.00
17,640.00
Pasir Beton
M³
0.027
125,000.00
3,375.00
Koral Beton
M³
0.041
135,000.00
5,535.00
Tenaga
Tukang Kayu
Oh
1.000
47,500.00
47,500.00
Tukang Batu
Oh
0.018
42,500.00
765.00
Tukang Cat
Oh
1.000
42,500.00
42,500.00
Pekerja
Oh
2.100
36,000.00
75,600.00
Mandor
Oh
1.005
40,000.00
40,200.00
Sub Total
392,960.00
6.5
E. Membuat direksi keet & Gudang Sementara (m ²)
SNI 03-2835-2002
Bahan
31,250.00
Kayu 5/7
M³
0.180
1,700,000.00
306,000.00
8,500.00
Besi Strip
Kg
1.100
11,000.00
12,100.00
Semen Portland
Kg
35.000
1,050.00
36,750.00
Pasir Pasang
M³
0.150
125,000.00
18,750.00
Pasir Beton
M³
0.100
125,000.00
12,500.00
Koral Beton
M³
0.150
135,000.00
20,250.00
Bata Merah
Bh
30.000
500.00
15,000.00
Seng Plat
Lbr
0.250
27,000.00
6,750.00
Jendela Nako
Bh
2.0000
12,500.00
25,000.00
Kaca Polos 3 mm
M²
0.080
50,000.00
4,000.00
Kunci Tanam
Bh
0.150
25,000.00
3,750.00
Plywood 4 mm
Lbr
0.060
50,000.00
3,000.00
Tenaga
Tukang Kayu
Oh
2.000
47,500.00
95,000.00
Tukang Batu
Oh
1.000
42,500.00
42,500.00
Pekerja
Oh
2.000
36,000.00
72,000.00
Kepala Tukang
Oh
0.800
45,000.00
36,000.00
Mandor
Oh
0.050
40,000.00
2,000.00
Sub Total
751,100.00
II
PEKERJAAN TANAH
6.1
A. Galian Tanah Biasa sedalam 1 m (m ³)
SNI 03-2835-2002
Tenaga
Pekerja
Oh
0.400
36,000.00
14,400.00
Mandor
Oh
0.040
40,000.00
1,600.00
Sub Total
16,000.00
6.9
B. Urugan Kembali (m ³)
SNI 03-2835-2002
Tenaga
Pekerja
Oh
0.192
36,000.00
6,912.00
Mandor
Oh
0.019
40,000.00
760.00
Sub Total
7,672.00
6.11
C. Urugan Pasir Bawah Pondasi (m ³)
SNI 03-2835-2002
Bahan
Pasir Urug
M³
1.200
100,000.00
120,000.00
Tenaga
Pekerja
Oh
0.300
36,000.00
10,800.00
Mandor
Oh
0.010
40,000.00
400.00
Sub Total
131,200.00
III
PEKERJAAN PONDASI
6.6
D. Pasangan Pondasi Batu Kali 1 Pc: 5 Ps (m ³)
SNI 03-2835-2002
Bahan
93,500.00
Semen Portland
Kg
136.000
1,050.00
142,800.00
Pasir Pasang
M³
0.544
125,000.00
68,000.00
Tenaga
Pekerja
Oh
1.500
36,000.00
54,000.00
Tukang Batu
Oh
0.600
42,500.00
25,500.00
Kepala Tukang
Oh
0.060
45,000.00
2,700.00
Mandor
Oh
0.075
40,000.00
3,000.00
Sub Total
389,500.00
IV
PEKERJAAN DINDING
6.11
A. Pasangan Tembok ½ Bata 1Pc:4Ps (Trasraam) (m ²)
SNI 03-2835-2002
Bahan
Bata Merah 5 X 11 X 22 cm
Bh
70.000
500.00
35,000.00
Semen Portland
Kg
11.500
1,050.00
12,075.00
Pasir Pasang
M³
0.043
125,000.00
5,375.00
Tenaga
Pekerja
Oh
0.320
36,000.00
11,520.00
Tukang Batu
Oh
0.100
42,500.00
4,250.00
Kepala Tukang
Oh
0.010
45,000.00
450.00
Mandor
Oh
0.015
40,000.00
600.00
Sub Total
69,270.00
Thank you for evaluating
BCL easyConverter Desktop
This Word document was converted from PDF with an evaluation
version of BCL easyConverter Desktop software that only
converts the first 3 pages of your PDF.
CTRL+ Click on the link below to purchase