Rev.0 / 9-18-17
During the Installation of starting system 2xC32 M/E Layout Electrical cable wiring from M/E to ECR and ECR to
Bridge Console room. The cable tray from other contractor are loaded of wiring then we coordinated to the
owner representative to make a fabrication new cable tray for free layout cable. Conduct change of location
cable wire installation layout from M/E to ECR up to Bridge Console..
CORRECTIVE ACTION
Activity Date of Responsibility
Implementation