CATATAN : Sebelum menekan tombol SETUJU atau tombol TIDAK SETUJU , terleb
INFORMASI UMUM
No. U RAIAN I N F O R MAS I
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 8.73 Kilometer
7.45 Km = a C 7.45 Km = b
A B
5.0 Km = c
Base Camp ---------> D
20 ....................................
21 ....................................
22 ....................................
N F O R MAS I
………………………
…………………………………………..
………………………………………….
………………………
...............
( Leff = a + b )
meter
meter
riode Pelaksanaan)
)*b } / (a+b)
...........
............
.............
............
.............
PETA LOKASI
QUARRY
Medan
km 000+000
10,00 km
Tanah Jawa
ke
5,00 km
Tanjung
Balai
ke Rantau Prapat
( (5+158/2)x158 + (5+7,45/2)*7,45)
= 80,61 km
(158+7,45)
HARGA DASAR SATUAN UPAH
DAFTAR
HARGA DASAR SATUAN BAHAN
R
TUAN BAHAN
HARGA
SATUAN KETERANGAN
( Rp.)
34,100.00
35,750.00
6,050.00
19,250.00
38,500.00
1,250,000.00
38,500.00
9,000.00
259,000.00 Base Camp
45,000.00 Base Camp
500.00 Base Camp
45,000.00
50,000.00
55,000.00
75,000.00
30,000.00
550.93
30,000.00
30,000.00
30,000.00
750,000.00
400,000.00
0.00
8,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34,100.00
0.00 alat penyuntik epoxy
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8,000.00
HARGA PEROLEHAN ALAT
Harga Harga Sumber
No. Jenis Alat yang Data
digunakan
Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3
7
PETA LOKASI ,
4
Medan
km 000+000
QUARRY Kisaran
Km 158+000
Kisaran - Sp. Kawat
5
k
m
5,00 km
10,00 km
ke Rantau Prapat
Catatan :
Patumbak - Medan = 10 km
Medan - Lokasi Proyek = 165.20 km
Total Sumber Quarry Patumbak s/d Lokasi Proyek = 175.20 km
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 20.00 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume pasir Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 20.00 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume batu kali Bil 1.44 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 25.00 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam
9 Berat volume batu belah Bil 1.60 ton/m3
3.d PEKERJA
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 2,513.99 Rupiah
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 25.00 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume gravel Bil 2.20 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 15.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume pasir urug Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 7.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat isi volume pasir beton Bil 1.69 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1
KET.
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Base Camp
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
ke Tanjung
Balai
ke Rantau Prapat
tangsiantar
HAN
HARGA
SATUAN
(Rp.)
25,750.00
172,248.83
242,689.55
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
19,500.00
172,248.83
242,689.55
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
9,000.00
172,248.83
242,689.55
262,099.45
4,657.31
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
8,000.00
172,248.83
242,689.55
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
17,500.00
172,248.83
242,689.55
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
18,000.00
172,248.83
242,689.55
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
20,000.00
172,248.83
242,689.55
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
Formulir Penentuan Harga Bahan
Bahan : Semen
2 Handling - - -
Bahan : Aspal
1.2
1.8.(1)
1.8.(2)
1.17
1.20.(1)
1.20.(2)
1.21
2.1.(1)
2.2.(1)
2.3.(1)
2.3.(2)
2.3.(3)
2.3.(4)
2.3.(5)
2.3.(6)
2.3.(7)
2.3.(8)
2.3.(9)
2.3.(10)
2.3.(11)
2.3.(12)
2.3.(13)
2.3.(14)
2.4.(1)
2.4.(2)
2.4.(3)
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
3.1.(1a)
3.1.(1b)
3.1.(2)
3.1.(3)
3.1.(4)
3.1.(5)
3.1.(6)
3.1.(7)
3.1.(8)
3.1.(9).
3.2.(1a)
3.2.(1b)
3.2.(2a)
3.2.(2b)
3.2.(3a)
3.2.(3b)
3.3.(1)
3.4.(1)
3.4.(2)
3.4.(3)
3.4.(4)
3.4.(5)
3.5.(1)
3.5.(2a)
3.5.(2b)
3.5.(2c)
3.5.(3)
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
4.2.(1)
4.2.(2a)
4.2.(2b)
4.2.(3)
4.2.(4)
4.2.(5)
4.2.(6)
4.2.(7)
4.2.(8)
4.2.(9)
4.2.(10)
4.2.(11)
4.2.(12)
4.2.(13)
4.2.(14)
4.2.(15)
4.2.(16)
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
5.1.(1)
5.1.(2)
5.2,(1)
5.2,(2)
5.3.(1)
5.3.(2)
5.3.(3)
5.4.(1)
5.4.(2)
5.5.(1)
5.5.(2)
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
6.1 (1)(a)
6.1 (1)(b)
6.1 (2)(a)
6.1 (2)(b)
6.1 (2)(c)
6.2 (1)
6.2 (2)
6.2 (3a)
6.2 (3b)
6.2 (4a)
6.2 (4b)
6.2 (4c)
6.2 (4d)
6.3 (1)
6.3 (2)
6.3(3a)
6.3(3b)
6.3.(4a)
6.3.(4b)
6.3(5a)
6.3(5b)
6.3(5c)
6.3(5d)
6.3(6a)
6.3(6b)
6.3(6c)
6.3(6d)
6.3(7a)
6.3(7b)
6.3(7c)
6.3(7d)
6.3.(8)
6.5.(1)
6.6.(1)
6.6.(2)
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
7.1 (1)
7.1 (2)
7.1 (3) a
7.1 (3) b
7.1 (4)
7.1 (5) a
7.1 (5) b
7.1 (6)
7.1 (7) a
7.1 (7) b
7.1 (8)
7.1 (9)
7.1 (10)
7.2 (1a)
7.2 (1b)
7.2 (1c)
7.2 (2a)
7.2 (2b)
7.2 (2c)
7.2 (3)a
7.2 (3)b
7.2 (4)a
7.2 (4)b
7.2.(5)
7.2.(6)
7.2.(7)
7.2.(8)
7.2.(9)
7.2.(10)
7.2.(11).a
7.2.(11).b
7.2.(12).a
7.2.(12).b
7.3 (1)
7.3 (2)
7.3 (3)
7.3 (4)
7.3 (5)
7.3 (6)
7.4 (1) a
7.4 (1) b
7.4 (1) c
7.4 (2) a
7.4 (2) b
7.4 (2) c
7.4 (3) a
7.4 (3) b
7.4 (3) c
7.4 (3) d
7.4.(4).a
7.4.(4).b
7.4.(4).c
7.4.(4).d
7.5 (1)
7.5 (2)
7.6 (1)
7.6 (2)
7.6 (3)
7.6 (4)
7.6 (5)
7.6 (6)
7.6 (7)
7.6 (8) a
7.6 (8) b
7.6 (8) c
7.6 (9) a
7.6 (9) b
7.6 (10) a
7.6 (10) b
7.6 (11) a
7.6 (11) b
7.6 (12) a
7.6 (12) b
7.6 (13)
7.6 (14) a
7.6 (14) b
7.6 (15) a
7.6 (15) b
7.6 (16) a
7.6 (16) b
7.6 (17) a
7.6 (17) b
7.6 (18) a
7.6 (18) b
7.6 (19) a
7.6 (19) b
7.6 (20)
7.6 (21)
7.6 (22)
7.6 (23)
7.6 (24)
7.6 (25) a
7.6 (25) b
7.6 (26) a
7.6 (26) b
7.6 (27) a
7.6 (27) b
7.6 (28)
7.7.(1)
7.9.(1)
7.10.(1)
7.10.(2)
7.10.(3) a.
7.10.(3) b.
7.10.(3) c.
7.11.(1) a.
7.11.(1) b.
7.11.(2)
7.11.(3)
7.11.(4)
7.11.(5)
7.11.(6)
7.11.(7)
7.12.(1a)
7.12.(1b)
7.12.(1c)
7.12.(2)
7.12.(3)
7.12.(4)
7.13.(1)
7.14.(1)
7.15.(1)
7.15.(2)
7.15.(3)
7.15.(4)
7.15.(5)
7.15.(6)
7.15.(7)
7.15.(8)
7.15.(9)
7.16.(1)
7.16.(2).a
7.16.(2).b
7.16.(3).a
7.16.(3).a
7.16.(4)
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
8.1 (1)
8.1 (2)
8.1 (3)
8.1 (4)
8.1 (5)
8.1 (6)
8.1 (7)
8.1 (8)
8.1 (9)
8.2.(1)
8.3.(1a)
8.3.(1b)
8.3.(2)
8.3.(3)
8.4.(1)
8.4.(2)
8.4.(3a)
8.4.(3b)
8.4.(4a)
8.4.(4b)
8.4.(5)
8.4.(6a)
8.4.(6b)
8.4.(7)
8.4.(8)
8.4.(9)
8.4.(10a)
8.4.(10b)
8.4.(10c)
8.4.(10d)
8.4.(10e)
8.4.(10f)
8.4.(10g)
8.4.(10h)
8.4.(10i)
8.4.(11)
8.4.(12)
8.4.(13)
8.4.(14)
8.4.(15)
8.4.(16)
8.4.(17)
8.4.(18)
8.4.(19)
8.4.(20)
8.4.(21)
8.4.(22)
8.4.(23)
8.5(1)
8.5(2)
8.5(3)
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
9.1.(1)
9.1.(2)
9.1.(3)
9.1.(4) a
9.1.(4) b
9.1.(5) a
9.1.(5) b
9.1.(6)
9.1.(7)
9.1.(8)
9.1.(9)
9.1.(10)
9.1.(11)
9.1.(12)
9.1.(13)
9.1.(14)
9.1.(15)
9.1.(16)
9.1.(17)
9.1.(18)
9.1.(19)
9.1.(20)
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
10.1 (1)
10.1 (2)
10.1 (3)
10.1 (4)
10.1 (5)
Uraian
DIVISI 1. UMUM
Mobilisasi
Manajemen dan Keselamatan Lalu Lintas
Jembatan Sementara
Pengamanan Lingkungan Hidup
Pengeboran, termasuk SPT dan Laporan
Sondir termasuk Laporan
Manajemen Mutu
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
Galian untuk Selokan Drainase dan Saluran Air
Pasangan Batu dengan Mortar
Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm
Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm
Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm
Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm
Gorong2 Pipa Baja Bergelombang
Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm
Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm
Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm
Saluran berbentuk U Tipe DS 1
Saluran berbentuk U Tipe DS 2
Saluran berbentuk U Tipe DS 3
Beton K250 (fc’ 20) untuk struktur drainase beton minor
Baja Tulangan untuk struktur drainase beton minor
Pasangan Batu tanpa Adukan (Aanstamping)
Bahan Porous untuk Bahan Penyaring (Filter)
Anyaman Filter Plastik
Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 7. STRUKTUR
Beton mutu tinggi fc’50 Mpa
Beton mutu tinggi fc’45 Mpa
Beton mutu tinggi fc’40 Mpa dengan traveler
Beton mutu tinggi fc’40 Mpa perancah
Beton mutu tinggi fc’35 Mpa
Beton mutu sedang fc’30 MPa lantai jembatan
Beton mutu sedang fc’30 MPa untuk ………
Beton mutu sedang fc’25 Mpa
Beton mutu sedang fc’20 MPa
Beton mutu sedang fc’20 MPa yang dilaksanakan di air
Beton mutu rendah fc’15 MPa
Beton Siklop fc’15 Mpa
Beton mutu rendah fc’10 Mpa
Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter
Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter
Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang … meter
Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter
Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter
Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang … meter
Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter
Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter
Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter
Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter
Penyediaan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter
Pemasangan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter
Baja Prategang
Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter
Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter
Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah pengecoran (post tension)
Penyediaan balok gelagar Tee Beam bentang 60 m
Pemasangan balok gelagar Tee Beam bentang 60 m
Penyediaan panel full deph slab
Pemasangan panel full deph slab
Baja Tulangan U 24 Polos
Baja Tulangan U 32 Polos
Baja Tulangan U 32 Ulir
Baja Tulangan U 39 Ulir
Baja Tulangan U 48 Ulir
Anyaman Kawat Yang Dilas (Welded Wire Mesh)
Penyediaan Baja Struktur BJ 34 (Titik Leleh 210 MPa)
Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa)
Penyediaan Baja Struktur BJ …. (Titik Leleh ….. MPa)
Pemasangan Baja Struktur BJ 34 (Titik Leleh 210 MPa)
Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa)
Pemasangan Baja Struktur BJ …. (Titik Leleh ….. MPa)
Pengadaan Struktur Jembatan Rangka Baja Panjang 40 m, Lebar 9 m
Pengadaan Struktur Jembatan Rangka Baja Panjang 50 m, Lebar 9 m
Pengadaan Struktur Jembatan Rangka Baja Panjang 60 m, Lebar 9 m
Pengadaan Struktur Jembatan Rangka Baja Panjang .... m, Lebar .. m
Pemasangan jembatan rangka baja standar panjang 40 m, lebar 9 m
Pemasangan jembatan rangka baja standar panjang 50 m, lebar 9 m
Pemasangan jembatan rangka baja standar panjang 60 m, lebar 9 m
Pemasangan jembatan rangka baja standar panjang …. m, lebar …. m
Pemasangan jembatan Rangka Baja
Pengangkutan Bahan Jembatan
Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk
Dinding Turap Kayu Tanpa Pengawetan
Dinding Turap Kayu Dengan Pengawetan
Dinding Turap Baja
Dinding Turap Beton
Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm
Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. mm
Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal 10 mm
Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal … mm
Penyediaan Tiang Pancang Baja Diameter ….. mm dengan tebal ... mm
Penyediaan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm
Penyediaan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. mm x …. mm
Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm
Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x …... mm
Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm
Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …... mm
Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm
Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter ……mm
Pemancangan Tiang Pancang Kayu Ukuran …. mm
Pemancangan Tiang Pancang Baja Diameter 500 mm
Pemancangan Tiang Pancang Baja Diameter ..… mm
Pemancangan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm
Pemancangan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. mm x …. mm
Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm
Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x …... mm
Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm
Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …... mm
Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm
Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter …... mm
Tiang Bor Beton, diameter 800 mm
Tiang Bor Beton, diameter ….. mm
Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13) s/d 7.6.(18) bila Tiang Pancang dikerjakan
di Tempat Yang Berair.
Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) bila Tiang Bor Beton dikerjakan
di Tempat Yang Berair.
Pengujian Pembebanan Pada Tiang Dengan Diameter sampai 600 mm
Pengujian Pembebanan Pada Tiang Dengan Diameter diatas 600 mm
Tiang Uji jenis …… ukuran …….
Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beban hidrolik Cara Beban Siklik
Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beban hidrolik Cara Beban Bertahap
Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja beban statis
Cara Beban Siklik
Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja beban statis
Cara Beban Bertahap
Pengujian Crosshole sonic logging (CSL) pada Tiang bor beton diameter ....
Pengujian Pembebanan Dinamis Jenis PDLT (Pile Dynamic Load Testing) pada Tiangukuran / diameter ....
Pengujian Keutuhan Tiang dengan Pile Integrated Test (PIT)
Dinding Sumuran Silinder terpasang, Diameter …………….
Pasangan Batu
Pasangan Batu Kosong yang Diisi Adukan
Pasangan Batu Kosong
Bronjong dengan kawat yang dilapisi galvanis
Bronjong dengan kawat yang dilapisi PVC
Tambahan Biaya untuk Anyaman Penulangan Tanah dengan Kawat yang Dilapisi PVC
Expansion Joint Tipe Asphaltic Plug, Fixed
Expansion Joint Tipe Asphaltic Plug, Moveable
Expansion Joint Tipe Rubber 1
Expansion Joint Tipe Rubber 2
Expansion Joint Tipe Rubber 2
Joint Filler untuk Sambungan Konstruksi
Expansion Joint Tipe Baja Bersudut
Expansion Joint Tipe Modular Lebar ……
Perletakan Logam Tipe Fixed 150 Ton
Perletakan Logam Tipe Moveable 150 Ton
Perletakan Logam Tipe …..
Perletakan Elastomerik Alam Ukuran ……mm x ……. mm x ……. mm
Perletakan Elastomerik Sintetis Ukuran ……mm x ……. mm x ……. mm
Perletakan Strip
Sandaran (Railing)
Papan Nama Jembatan
Pembongkaran Pasangan Batu
Pembongkaran Beton
Pembongkaran Beton Pratekan
Pembongkaran Bangunan Gedung
Pembongkaran Rangka Baja
Pembongkaran Balok Baja (Steel Stringers)
Pembongkaran Lantai Jembatan Kayu
Pembongkaran Jembatan Kayu
Pengangkutan Hasil Bongkaran yang melebihi 5 km
Deck drain
Pipa Drainase Baja diameter 75 mm
Pipa Drainase Baja diameter ….. mm
Pipa Drainase PVC diameter 75 mm
Pipa Drainase PVC diameter …. mm
Pipa Penyalur PVC
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
LS 1.0 504,380,500
LS 1.0 175,830,000
LS 1.0 94,617,964
LS 1.0 40,080,000
M1 1.0 508,750
M1 1.0 257,583
LS 1.0 231,600,000
M3 1.0 21,693.45
M3 1.0 345,340.73
M1 1.0 313,077.66
M1 1.0 441,334.97
M 1
1.0 903,799.32
M1 1.0 1,177,504.42
Ton 1.0 16,369,404.63
M1 1.0 83,082.52
M1 1.0 91,853.67
M 1
1.0 100,682.35
M1 1.0 216,445.00
M1 1.0 252,519.00
M1 1.0 303,023.00
M3 1.0 757,392.88
Kg 1.0 10,886.66
M 3
1.0 205,707.73
M3 1.0 91,187.79
M2 1.0 25,416.90
M1 1.0 63,613.35
M3 1.0 56,099.57
M3 1.0 88,802.45
M3 1.0 103,849.83
M3 1.0 4,507.64
M 3
1.0 436,074.45
M3 1.0 436,915.07
M3 1.0 85,047.88
M3 1.0 420,579.37
M3 1.0 71,977.74
M3 1.0 85,392.52
M 3
1.0 123,482.99
M3 1.0 95,426.52
M3 1.0 148,278.88
M3 1.0 102,867.82
M3 1.0 125,543.80
M3 1.0 125,543.80
M2 1.0 196.45
M2 1.0 28,652.57
buah 1.0 77,273.75
buah 1.0 104,899.92
buah 1.0 160,382.25
buah 1.0 331,532.82
M2 1.0 5,837.84
M 2
1.0 5,837.84
M2 1.0 5,837.84
M2 1.0 5,837.84
M2 1.0 5,837.84
M3 1.0 317,288.79
M3 1.0 312,354.04
M3 1.0 309,135.23
Ton 1.0 753,911.06
M3 1.0 125,280.20
M2 1.0 1,517.88
Liter 1.0 8,113.20
Liter 1.0 5,660.18
Liter 1.0 6,709.48
Ton 1.0 709,617.35
Ton 1.0 911,989.31
Ton 1.0 648,172.52
Ton 1.0 825,582.08
Kg 1.0 30,000.00
M3 1.0 893,493.59
M3 1.0 1,463,958.29
M3 1.0 511,966.62
M3 1.0 316,454.58
M3 1.0 307,898.72
M 3
1.0 263,807.30
M3 1.0 315,879.78
M3 1.0 893,493.59
M3 1.0 1,463,958.29
M3 1.0 511,966.62
Ton 1.0 782,258.71
M3 1.0 105,819.54
M3 1.0 138,918.04
M3 1.0 139,744.91
Liter 1.0 5,772.87
Liter 1.0 6,053.74
Liter 1.0 6,709.48
Liter 1.0 3,467.28
Liter 1.0 5,967.01
M2 1.0 7,756.11
M 2
1.0 12,407.63
Liter 1.0 7,380.67
Liter 1.0 165.83
Liter 1.0 14,584.43
Liter 1.0 20,023.02
Liter 1.0 19,903.15
Kg 1.0 24,000.00
Ton 1.0 944,157.22
Ton 1.0 815,710.13
Ton 1.0 822,043.88
Ton 1.0 822,043.88
Ton 1.0 720,809.64
Ton 1.0 720,809.64
Ton 1.0 747,415.11
Ton 1.0 872,371.99
Ton 1.0 747,415.11
Ton 1.0 966,748.98
Ton 1.0 709,617.35
Ton 1.0 911,989.31
Ton 1.0 709,617.35
Ton 1.0 911,989.31
Ton 1.0 648,172.52
Ton 1.0 825,582.08
Ton 1.0 648,172.52
Ton 1.0 825,582.08
Kg 1.0 30,000.00
M3 1.0 1,244,344.87
M3 1.0 1,107,484.67
M 3
1.0 1,176,454.94
M3 1.0
M3 1.0 1,385,837.81
M 3
1.0
M3 1.0
M3 1.0 1,309,759.31
M3 1.0 1,282,674.47
M3 1.0
M3 1.0 979,741.15
M3 1.0 944,768.57
M3 1.0
M3 1.0 657,219.67
M3 1.0 517,140.56
M3 1.0 570,482.56
Buah 1.0 17,250,000.00
Buah 1.0 23,000,000.00
Buah 1.0 0.00
Buah 1.0 23,669,307.33
Buah 1.0 40,820,351.33
Buah 1.0 38,513,900.20
Buah 1.0 17,250,000.00
Buah 1.0 0.00
Buah 1.0 477,229.13
Buah 1.0 477,229.13
Buah 1.0
Buah 1.0
Kg 1.0 109,473.81
Buah 1.0 11,783,126.61
Buah 1.0 12,920,041.13
m3 1.0 647,318.14
Buah 1.0
Buah 1.0
Buah 1.0
Buah 1.0
Kg 1.0 11,870.26
Kg 1.0 11,864.51
Kg 1.0 12,623.51
Kg 1.0 11,441.88
Kg 1.0 12,623.51
Kg 1.0 42,042.94
Kg 1.0 12,801.30
Kg 1.0 12,801.30
Kg 1.0 151.30
Kg 1.0 396.14
Kg 1.0 396.14
Kg 1.0 396.14
Buah 1.0
Buah 1.0
Buah 1.0
Buah 1.0
Buah 1.0
Buah 1.0
Buah 1.0
Buah 1.0
Kg 1.0 492.01
Kg 1.0 246.81
M1 1.0 36,234.08
M2 1.0 42,562.10
M2 1.0 36,070.21
M2 1.0 21,815.01
M2 1.0 399,522.32
M1 1.0 42,562.10
M1 1.0 28,882.71
M 1
1.0 79,565.39
M1 1.0 79,565.39
M1 1.0 91,286.85
M1 1.0
M1 1.0
M 1
1.0
M1 1.0
M1 1.0
M1 1.0
M1 1.0
M1 1.0
M1 1.0 49,619.29
M1 1.0 16,539.76
M 1
1.0 16,539.76
M1 1.0
M1 1.0
M1 1.0
M1 1.0
M 1
1.0
M1 1.0
M1 1.0
M1 1.0
M1 1.0 1,241,166.84
M1 1.0 1,930,929.89
M 1
1.0 2,046.79
M1 1.0 9,622.44
buah 1.0
buah 1.0
M1 1.0
buah 1.0
buah 1.0
buah 1.0
buah 1.0
buah 1.0
buah 1.0
buah 1.0
M 1
1.0
M3 1.0 420,823.04
M3 1.0 385,824.69
M3 1.0 215,058.08
M3 1.0 361,806.70
M3 1.0
M2 1.0
M1 1.0
M1 1.0
M1 1.0
M1 1.0
M 1
1.0
M1 1.0
M1 1.0
M1 1.0
buah 1.0
buah 1.0
buah 1.0
buah 1.0
buah 1.0
M1 1.0
M1 1.0 15,263.55
buah 1.0 133,597.11
M3 1.0 148,526.51
M3 1.0 278,637.94
M3 1.0 152,189.22
M2 1.0 56,473.28
M2 1.0 193,679.64
M' 1.0 104,980.00
M2 1.0 58,225.61
M2 1.0 102,441.97
M3 per Km 1.0
Unit 1.0
M' 1.0
M' 1.0
M' 1.0
M' 1.0
M' 1.0
M3 1.0 287,975.33
M3 1.0 296,751.07
M3 (vol. gembur) 1.0 246,588.71
M3 1.0 309,135.23
M3 1.0 1,803,522.21
M3 1.0 882,716.76
M 3
1.0 1,097,582.43
M3 1.0 1,149,178.25
Liter 1.0 7,677.69
M3 1.0
M2 1.0 7,493.56
M 2
1.0 8,264.43
M2 1.0 7,263.13
Buah 1.0 6,860.63
M2 1.0 114,790.83
M2 1.0 103,578.33
Buah 1.0 422,126.51
Buah 1.0 625,355.96
Buah 1.0 468,701.51
Buah 1.0 717,676.51
Buah 1.0 92,685.47
Buah 1.0 315,996.04
Buah 1.0 143,920.52
M1 1.0 624,573.52
Buah 1.0 64,934.70
Buah 1.0 144,859.70
M1 1.0 69,628.58
M1 1.0 77,940.64
M 1
1.0 81,284.01
M1 1.0 95,146.05
M1 1.0 112,634.43
Buah 1.0 41,034.94
Buah 1.0 348,588.01
Buah 1.0
Buah 1.0
M1 1.0 29,943.41
M2 1.0 44,192.24
Buah 1.0
Buah 1.0
Buah 1.0
Buah 1.0
Buah 1.0
Buah 1.0
Buah 1.0
M' 1.0
M' 1.0
M' 1.0
M' 1.0
M 2
1.0 63,662.61
M2 1.0 347,312.12
M2 1.0 44,532.25
LS 1.0 56,623,023.88
LS 1.0 23,148,602.40
LS 1.0 28,859,763.40
LS 1.0 9,829,236.84
LS 1.0 52,277,525.21
###
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
Proyek / Bagpro :
No. Paket Kontrak :
Nama Paket :
Prop / Kab / Kodya :
1 Umum
2 Drainase
3 Pekerjaan Tanah
4 Pelebaran Perkerasan dan Bahu Jalan
5 Pekerasan Non Aspal
6 Perkerasan Aspal
7 Struktur
8 Pengembalian Kondisi dan Pekerjaan Minor
9 Pekerjaan Harian
10 Pekerjaan Pemeliharaan Rutin
Disusun oleh
Pejabat Pembuat Komitmen
( ............................. )
NIP
Jumlah Harga
Pekerjaan
(Rupiah)
1,047,274,797
21,773,966
3,242,517
1,833,261
5,240,200
18,062,724
201,447,807
11,306,108
2,422,153
170,738,152
1,483,341,685
148,334,169
1,631,675,854
…....................................
…....................................
Disusun oleh
Pejabat Pembuat Komitmen
( ............................. )
No. Mata
Uraian Satuan
Pembayaran
a b c
1.2 Mobilisasi LS
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS
1.8.(2) Jembatan Sementara LS
1.17 Pengamanan Lingkungan Hidup LS
1.20.(1) Pengeboran, termasuk SPT dan Laporan M1
1.20.(2) Sondir termasuk Laporan M1
1.21 Manajemen Mutu LS
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3
2.2.(1) Pasangan Batu dengan Mortar M3
2.3.(1) Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm M1
2.3.(2) Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm M1
2.3.(3) Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm M1
2.3.(4) Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm M1
2.3.(5) Gorong2 Pipa Baja Bergelombang Ton
2.3.(6) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm M1
2.3.(7) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm M1
2.3.(8) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm M1
2.3.(9) Saluran berbentuk U Tipe DS 1 M1
2.3.(10) Saluran berbentuk U Tipe DS 2 M1
2.3.(11) Saluran berbentuk U Tipe DS 3 M1
2.3.(12) Beton K250 (fc’ 20) untuk struktur drainase beton minor M3
2.3.(13) Baja Tulangan untuk struktur drainase beton minor Kg
2.3.(14) Pasangan Batu tanpa Adukan (Aanstamping) M3
2.4.(1) Bahan Porous untuk Bahan Penyaring (Filter) M3
2.4.(2) Anyaman Filter Plastik M2
2.4.(3) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan M1
3.1.(1a) Galian Biasa M3
3.1.(1b) Galian Batu Lunak M3
3.1.(2) Galian Batu M3
3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter M3
3.1.(4) Galian Struktur dengan kedalaman 2 - 4 meter M3
3.1.(5) Galian Struktur dengan kedalaman 4 - 6 meter M3
3.1.(6) Galian Perkerasan Beraspal dengan Cold Milling Machine M3
3.1.(7) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3
3.1.(8) Galian Perkerasan berbutir M3
3.1.(9). Galian Perkerasan Beton M3
3.2.(1a) Timbunan Biasa dari sumber galian M3
3.2.(2a) Timbunan Pilihan dari sumber galian M3
3.2.(3a) Timbunan Pilihan (diukur diatas bak truk) M3
3.3.(1) Penyiapan Badan Jalan M2
3.4.(1) Pembersihan dan Pengupasan Lahan M2
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm buah
3.4.(3) Pemotongan Pohon Pilihan diameter 30 – 50 cm buah
3.4.(4) Pemotongan Pohon Pilihan diameter 50 – 75 cm buah
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm buah
3.5.(1) Geotekstil Filter untuk Drainage Bawah Permukaan (Kelas 2) M2
3.5.(2a) Geotekstil Separator Kelas 1 M2
3.5.(2b) Geotekstil Separator Kelas 2 M2
3.5.(2c) Geotekstil Separator Kelas 3 M2
3.5.(3) Geotekstil Stabilisator (Kelas 1) M2
4.2.(1) Lapis Pondasi Agregat Kelas A M3
4.2.(2a) Lapis Pondasi Agregat Kelas B M3
4.2.(2b) Lapis Pondasi Agregat Kelas S M3
4.2.(3) Semen untuk Lapis Pondasi Semen Tanah Ton
4.2.(4) Lapis Pondasi Semen Tanah M3
4.2.(5) Agregat Penutup BURTU M2
4.2.(6) Bahan Aspal untuk Pekerjaan Pelaburan Liter
4.2.(7) Lapis Resap Pengikat Liter
4.2.(8) Lapis Resap Perekat Liter
4.2.(9) Laston Lapis Antara (AC-BC) Ton
4.2.(10) Laston Lapis Antara Modifikasi (AC-BC Mod) Ton
4.2.(11) Laston Lapis Pondasi (AC-Base) Ton
4.2.(12) Laston Lapis Pondasi Modifikasi (AC-Base Mod) Ton
4.2.(13) Bahan anti pengelupasan Kg
4.2.(14) Perkerasan Beton Semen M3
4.2.(15) Perkerasan Beton Semen dengan anyaman Tulangan Tunggal M3
4.2.(16) Lapis Pondasi Bawah Beton Kurus M3
5.1.(1) Lapis Pondasi Agregat Kelas A M3
5.1.(2) Lapis Pondasi Agregat Kelas B M3
5.2,(1) Lapis Permukaan Agregat Tanpa Penutup Aspal M3
5.2,(2) Lapis Pondasi Agregat Tanpa Penutup Aspal M3
5.3.(1) Perkerasan Beton Semen M3
5.3.(2) Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal M3
5.3.(3) Lapis Pondasi bawah Beton Kurus M3
5.4.(1) Semen untuk Lapis Pondasi Semen Tanah Ton
5.4.(2) Lapis Pondasi Semen Tanah M3
5.5.(1) Lapis Pondasi Agregat Semen Kelas A (Cement Treated Base) (CTB) M3
5.5.(2) Lapis Pondasi Agregat Semen Kelas B (Cement Treated Sub Base) (CTSB) M3
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter
6.1 (1)(b) Lapis Resap Pengikat - Aspal Emulsi Liter
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter
6.1 (2)(b) Lapis Perekat - Aspal Emulsi Liter
6.1 (2)(c) Lapis Perekat - Aspal Emulsi Modifikasi Liter
6.2 (1) Agregat Penutup BURTU M2
6.2 (2) Agregat Penutup BURDA M2
6.2 (3a) Bahan Aspal untuk Pekerjaan Pelaburan Liter
6.2 (3b) Bahan Aspal Modifikasi untuk Pekerjaan Pelaburan Liter
6.2 (4a) Aspal Cair Emulsi untuk Precoated Liter
6.2 (4b) Aspal Emulsi untuk Precoated Liter
6.2 (4c) Aspal Emulsi Modifikasi untuk Precoated Liter
6.2 (4d) Bahan anti pengelupasan Kg
6.3 (1) Latasir Kelas A (SS-A) Ton
6.3 (2) Latasir Kelas B (SS-B) Ton
6.3(3a) Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang) Ton
6.3(3b) Lataston Lapis Aus Perata (HRS-WC(L)) (gradasi senjang/semi senjang) Ton
6.3.(4a) Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) Ton
6.3.(4b) Lataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi senjang) Ton
6.3(5a) Laston Lapis Aus (AC-WC) Ton
6.3(5b) Laston Lapis Aus Modifikasi (AC-WC Mod) Ton
6.3(5c) Laston Lapis Aus Perata (AC-WC(L)) Ton
6.3(5d) Laston Lapis Aus Modifikasi Perata (AC-WC(L)Mod) Ton
6.3(6a) Laston Lapis Antara (AC-BC) Ton
6.3(6b) Laston Lapis Antara Modifikasi (AC-BC Mod) Ton
6.3(6c) Laston Lapis Antara Perata (AC-BC(L) Ton
6.3(6d) Laston Lapis Antara Modifikasi Perata (AC-BC(L)Mod) Leveling Ton
6.3(7a) Laston Lapis Pondasi (AC-Base) Ton
6.3(7b) Laston Lapis Pondasi Modifikasi (AC-Base Mod) Ton
6.3(7c) Laston Lapis Pondasi Perata (AC-Base(L)) Ton
6.3(7d) Laston Lapis Pondasi Modifikasi Perata (AC-Base(L)Mod) Ton
6.3.(8) Bahan anti pengelupasan Kg
6.5.(1) Campuran Aspal Dingin untuk Pelapisan M3
6.6.(1) Lapis Permukaan Penetrasi Macadam M3
6.6.(2) Lapis Pondasi/Perata Penetrasi Macadam M3
7.1 (1) Beton mutu tinggi fc’50 Mpa M3
7.1 (2) Beton mutu tinggi fc’45 Mpa M3
7.1 (3) a Beton mutu tinggi fc’40 Mpa dengan traveler M3
7.1 (3) b Beton mutu tinggi fc’40 Mpa perancah M3
7.1 (4) Beton mutu tinggi fc’35 Mpa M3
7.1 (5) a Beton mutu sedang fc’30 MPa lantai jembatan M3
7.1 (5) b Beton mutu sedang fc’30 MPa untuk ……… M3
7.1 (6) Beton mutu sedang fc’25 Mpa M3
7.1 (7) a Beton mutu sedang fc’20 MPa M3
7.1 (7) b Beton mutu sedang fc’20 MPa yang dilaksanakan di air M3
7.1 (8) Beton mutu rendah fc’15 MPa M3
7.1 (9) Beton Siklop fc’15 Mpa M3
7.1 (10) Beton mutu rendah fc’10 Mpa M3
7.2 (1a) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah
7.2 (1b) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah
7.2 (1c) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang … meter Buah
7.2 (2a) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah
7.2 (2b) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah
7.2 (2c) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang … meter Buah
7.2 (3)a Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah
7.2 (3)b Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter Buah
7.2 (4)a Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah
7.2 (4)b Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter Buah
7.2.(5) Penyediaan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah
7.2.(6) Pemasangan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah
7.2.(7) Baja Prategang Kg
7.2.(8) Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah
7.2.(9) Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah
7.2.(10) Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah pengecoran (post tension) m3
7.3 (1) Baja Tulangan U 24 Polos Kg
7.3 (2) Baja Tulangan U 32 Polos Kg
7.3 (3) Baja Tulangan U 32 Ulir Kg
7.3 (4) Baja Tulangan U 39 Ulir Kg
7.3 (5) Baja Tulangan U 48 Ulir Kg
7.3 (6) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg
7.4 (1) a Penyediaan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg
7.4 (1) b Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg
7.4 (1) c Penyediaan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg
7.4 (2) a Pemasangan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg
7.4 (2) b Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg
7.4 (2) c Pemasangan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg
7.4 (3) a Pengadaan Struktur Jembatan Rangka Baja Panjang 40 m, Lebar 9 m Buah
7.4 (3) b Pengadaan Struktur Jembatan Rangka Baja Panjang 50 m, Lebar 9 m Buah
7.4 (3) c Pengadaan Struktur Jembatan Rangka Baja Panjang 60 m, Lebar 9 m Buah
7.4 (3) d Pengadaan Struktur Jembatan Rangka Baja Panjang .... m, Lebar .. m Buah
7.4.(4).a Pemasangan jembatan rangka baja standar panjang 40 m, lebar 9 m Buah
7.4.(4).b Pemasangan jembatan rangka baja standar panjang 50 m, lebar 9 m Buah
7.4.(4).c Pemasangan jembatan rangka baja standar panjang 60 m, lebar 9 m Buah
7.4.(4).d Pemasangan jembatan rangka baja standar panjang …. m, lebar …. m Buah
7.5 (1) Pemasangan jembatan Rangka Baja Kg
7.5 (2) Pengangkutan Bahan Jembatan Kg
7.6 (1) Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk M1
7.6 (2) Dinding Turap Kayu Tanpa Pengawetan M2
7.6 (3) Dinding Turap Kayu Dengan Pengawetan M2
7.6 (4) Dinding Turap Baja M2
7.6 (5) Dinding Turap Beton M2
7.6 (6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm M1
7.6 (7) Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. mm M1
7.6 (8) a Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal 10 mm M1
7.6 (8) b Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal … mm M1
7.6 (8) c Penyediaan Tiang Pancang Baja Diameter ….. mm dengan tebal ... mm M1
7.6 (9) a Penyediaan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm M1
7.6 (9) b Penyediaan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. mm x …. mm M1
7.6 (10) a Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1
7.6 (10) b Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x …... mm M1
7.6 (11) a Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1
7.6 (11) b Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …... mm M1
7.6 (12) a Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1
7.6 (12) b Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter ……mm M1
7.6 (13) Pemancangan Tiang Pancang Kayu Ukuran …. mm M1
7.6 (14) a Pemancangan Tiang Pancang Baja Diameter 500 mm M1
7.6 (14) b Pemancangan Tiang Pancang Baja Diameter ..… mm M1
7.6 (15) a Pemancangan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm M1
7.6 (15) b Pemancangan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. mm x …. mm M1
7.6 (16) a Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1
7.6 (16) b Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x …... mm M1
7.6 (17) a Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1
7.6 (17) b Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …... mm M1
7.6 (18) a Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1
7.6 (18) b Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter …... mm M1
7.6 (19) a Tiang Bor Beton, diameter 800 mm M1
7.6 (19) b Tiang Bor Beton, diameter ….. mm M1
7.6 (20) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13) s/d 7.6.(18) bila Tiang Pancang dikerjakan M1
di Tempat Yang Berair. 0
7.6 (21) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) bila Tiang Bor Beton dikerjakan M1
di Tempat Yang Berair. 0
7.6 (22) Pengujian Pembebanan Pada Tiang Dengan Diameter sampai 600 mm buah
7.6 (23) Pengujian Pembebanan Pada Tiang Dengan Diameter diatas 600 mm buah
7.6 (24) Tiang Uji jenis …… ukuran ……. M1
7.6 (25) a Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beban hidrolik Cara Beban Sikli buah
7.6 (25) b Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beban hidrolik Cara Beban Ber buah
7.6 (26) a Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja beban statis buah
Cara Beban Siklik 0
7.6 (26) b Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja beban statis buah
Cara Beban Bertahap 0
7.6 (27) a Pengujian Crosshole sonic logging (CSL) pada Tiang bor beton diameter .... buah
7.6 (27) b Pengujian Pembebanan Dinamis Jenis PDLT (Pile Dynamic Load Testing) pada Tiangukuran / diameter .. buah
7.6 (28) Pengujian Keutuhan Tiang dengan Pile Integrated Test (PIT) buah
7.7.(1) Dinding Sumuran Silinder terpasang, Diameter ……………. M1
7.9.(1) Pasangan Batu M3
7.10.(1) Pasangan Batu Kosong yang Diisi Adukan M3
7.10.(2) Pasangan Batu Kosong M3
7.10.(3) a. Bronjong dengan kawat yang dilapisi galvanis M3
7.10.(3) b. Bronjong dengan kawat yang dilapisi PVC M3
7.10.(3) c. Tambahan Biaya untuk Anyaman Penulangan Tanah dengan Kawat yang Dilapisi PVC M2
7.11.(1) a. Expansion Joint Tipe Asphaltic Plug, Fixed M1
7.11.(1) b. Expansion Joint Tipe Asphaltic Plug, Moveable M1
7.11.(2) Expansion Joint Tipe Rubber 1 M1
7.11.(3) Expansion Joint Tipe Rubber 2 M1
7.11.(4) Expansion Joint Tipe Rubber 2 M1
7.11.(5) Joint Filler untuk Sambungan Konstruksi M1
7.11.(6) Expansion Joint Tipe Baja Bersudut M1
7.11.(7) Expansion Joint Tipe Modular Lebar …… M1
7.12.(1a) Perletakan Logam Tipe Fixed 150 Ton buah
7.12.(1b) Perletakan Logam Tipe Moveable 150 Ton buah
7.12.(1c) Perletakan Logam Tipe ….. buah
7.12.(2) Perletakan Elastomerik Alam Ukuran ……mm x ……. mm x ……. mm buah
7.12.(3) Perletakan Elastomerik Sintetis Ukuran ……mm x ……. mm x ……. mm buah
7.12.(4) Perletakan Strip M1
7.13.(1) Sandaran (Railing) M1
7.14.(1) Papan Nama Jembatan buah
7.15.(1) Pembongkaran Pasangan Batu M3
7.15.(2) Pembongkaran Beton M3
7.15.(3) Pembongkaran Beton Pratekan M3
7.15.(4) Pembongkaran Bangunan Gedung M2
7.15.(5) Pembongkaran Rangka Baja M2
7.15.(6) Pembongkaran Balok Baja (Steel Stringers) M'
7.15.(7) Pembongkaran Lantai Jembatan Kayu M2
7.15.(8) Pembongkaran Jembatan Kayu M2
7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3 per Km
7.16.(1) Deck drain Unit
7.16.(2).a Pipa Drainase Baja diameter 75 mm M'
7.16.(2).b Pipa Drainase Baja diameter ….. mm M'
7.16.(3).a Pipa Drainase PVC diameter 75 mm M'
7.16.(3).a Pipa Drainase PVC diameter …. mm M'
7.16.(4) Pipa Penyalur PVC M'
8.1 (1) Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor M3
8.1 (2) Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor M3
8.1 (3) Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor M3 (vol. gembur)
8.1 (4) Waterbound Macadam untuk Pekerjaan Minor M3
8.1 (5) Campuran Aspal Panas untuk Pekerjaan Minor M3
8.1 (6) Lasbutag atau Latasbusir untuk Pekerjaan Minor M3
8.1 (7) Penetrasi Macadam untuk Pekerjaan Minor M3
8.1 (8) Campuran Aspal Dingin untuk Pekerjaan Minor M3
8.1 (9) Residu Bitumen untuk Pekerjaan Minor Liter
8.2.(1) Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya M3
8.3.(1a) Stabilisasi dengan Tanaman M2
8.3.(1b) Stabilisasi dengan Tanaman VS M2
8.3.(2) Semak / Perdu…………………. M2
8.3.(3) Pohon Jenis ……………………. Buah
8.4.(1) Marka Jalan Termoplastik M2
8.4.(2) Marka Jalan Bukan Termoplastik M2
8.4.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade Buah
8.4.(3b) Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade Buah
8.4.(4a) Rambu Jalan Tunggal dengan Pemantul High Intensity Grade Buah
8.4.(4b) Rambu Jalan Ganda dengan Pemantul High Intensity Grade Buah
8.4.(5) Patok Pengarah Buah
8.4.(6a) Patok Kilometer Buah
8.4.(6b) Patok Hektometer Buah
8.4.(7) Rel Pengaman M1
8.4.(8) Paku Jalan Buah
8.4.(9) Mata Kucing Buah
8.4.(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1
8.4.(10b) Kerb Pracetak Jenis 2 (Penghalang/Barrier) M1
8.4.(10c) Kerb Pracetak Jenis 3 (Kerb Berparit/Gutter) M1
8.4.(10d) Kerb Pracetak Jenis 4 (Penghalang Berparit / Barrier Gutter) t = 20 cm M1
8.4.(10e) Kerb Pracetak Jenis 5 (Penghalang Berparit / Barrier Gutter) t = 30 cm M1
8.4.(10f) Kerb Pracetak Jenis 6 (Kerb dengan Bukaan) Buah
8.4.(10g) Kerb Pracetak Jenis 7a (Kerb pada Pelandaian Trotoar) Buah
8.4.(10h) Kerb Pracetak Jenis 7b (Kerb pada Pelandaian Trotoar) Buah
8.4.(10i) Kerb Pracetak Jenis 7c (Kerb pada Pelandaian Trotoar) Buah
8.4.(11) Kerb yang digunakan kembali M1
8.4.(12) Perkerasan Blok Beton pada Trotoar dan Median M2
8.4.(13) Beton Pemisah Jalur (Concrete Barrier) Buah
8.4.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED Buah
8.4.(15) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe LED Buah
8.4.(16) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt Buah
8.4.(17) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt Buah
8.4.(18) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt Buah
8.4.(19) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt Buah
8.4.(20) Pagar Pemisah Pedestrian Carbon Steel M'
8.4.(21) Pagar Pemisah Pedestrian Galvanised M'
8.4.(22) Pagar Pemisah Pedestrian Carbon Steel M'
8.4.(23) Pagar Pemisah Pedestrian Galvanisasi M'
8.5(1) Pengembalian Kondisi Lantai Jembatan Beton M2
8.5(2) Pengembalian Kondisi Lantai Jembatan Kayu M2
8.5(3) Pengembalian Kondisi Pelapisan Permukaan Baja Struktur M2
9.1.(1) Mandor Jam
9.1.(2) Pekerja Biasa Jam
9.1.(3) Tukang Kayu, Tukang Batu, dsb Jam
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam
9.1.(4) b Dump Truck, kapasitas 6 - 8 m³ Jam
9.1.(5) a Truk Bak Datar 3 - 4 ton Jam
9.1.(5) b Truk Bak Datar 6 - 8 ton Jam
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam
9.1.(7) Bulldozer 100 - 150 PK Jam
9.1.(8) Motor Grader min 100 PK Jam
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam
9.1.(10) Loader Roda Berantai 75 - 100 PK Jam
9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam
9.1.(12) Crane 10 - 15 Ton Jam
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam
9.1.(14) Penggilas Bervibrasi 5 - 8 Ton Jam
9.1.(15) Pemadat Bervibrasi 1.5 - 3.0 PK Jam
9.1.(16) Penggilas Roda Karet 8 - 10 Ton Jam
9.1.(17) Kompresor 4000 - 6500 Ltr/mnt Jam
9.1.(18) Mesin Pengaduk beton (Molen) 0.3 - 0.6 M3 Jam
9.1.(19) Pompa Air 70 - 100 mm Jam
9.1.(20) Jack Hammer Jam
10.1 (1) Pemeliharaan Rutin Perkerasan LS
10.1 (2) Pemeliharaan Rutin Bahu Jalan LS
10.1 (3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan LS
10.1 (4) Pemeliharaan Rutin Perlengkapan Jalan LS
10.1 (5) Pemeliharaan Rutin Jembatan LS
Perkiraan Harga % Thd. Jumlah
Kuantitas Satuan Total Biaya Harga-Harga
(Rupiah) (%) (Rupiah)
d e f g = (d x e)
100.3828
Cumm
Harga Jumlah % for
Satuan Harga-Harga Major
(Rupiah) (Rupiah) Items
g h i
504,380,500 504,380,500
175,830,000 175,830,000
94,617,964 94,617,964
40,080,000 40,080,000
508,750 508,750
257,583 257,583
231,600,000 231,600,000 15.6134
21,693 21,693
345,341 345,341
313,078 313,078
441,335 441,335
903,799 903,799
1,177,504 1,177,504
16,369,405 16,369,405
83,083 83,083
91,854 91,854
100,682 100,682
216,445 216,445
252,519 252,519
303,023 303,023
757,393 757,393
10,887 10,887
205,708 205,708
91,188 91,188
25,417 25,417
63,613 63,613
56,100 56,100
88,802 88,802
103,850 103,850
4,508 4,508
436,074 436,074
436,915 436,915
85,048 85,048
420,579 420,579
71,978 71,978
85,393 85,393
123,483 123,483
148,279 148,279
125,544 125,544
196 196
28,653 28,653
77,274 77,274
104,900 104,900
160,382 160,382
331,533 331,533
5,838 5,838
5,838 5,838
5,838 5,838
5,838 5,838
5,838 5,838
317,289 317,289
312,354 312,354
309,135 309,135
753,911 753,911
125,280 125,280
1,518 1,518
8,113 8,113
5,660 5,660
6,709 6,709
709,617 709,617
911,989 911,989
648,173 648,173
825,582 825,582
30,000 30,000
893,494 893,494
1,463,958 1,463,958
511,967 511,967
316,455 316,455
307,899 307,899
263,807 263,807
315,880 315,880
893,494 893,494
1,463,958 1,463,958
511,967 511,967
782,259 782,259
105,820 105,820
138,918 138,918
139,745 139,745
5,773 5,773
6,054 6,054
6,709 6,709
3,467 3,467
5,967 5,967
7,756 7,756
12,408 12,408
7,381 7,381
166 166
14,584 14,584
20,023 20,023
19,903 19,903
24,000 24,000
944,157 944,157
815,710 815,710
822,044 822,044
822,044 822,044
720,810 720,810
720,810 720,810
747,415 747,415
872,372 872,372
747,415 747,415
966,749 966,749
709,617 709,617
911,989 911,989
709,617 709,617
911,989 911,989
648,173 648,173
825,582 825,582
648,173 648,173
825,582 825,582
30,000 30,000
1,244,345 1,244,345
1,107,485 1,107,485
1,176,455 1,176,455
- 0
1,385,838 1,385,838
- 0
- 0
1,309,759 1,309,759
1,282,674 1,282,674
- 0
979,741 979,741
944,769 944,769
- 0
657,220 657,220
517,141 517,141
570,483 570,483
17,250,000 17,250,000
23,000,000 23,000,000
- 0
23,669,307 23,669,307
40,820,351 40,820,351
38,513,900 38,513,900
17,250,000 17,250,000
- 0
477,229 477,229
477,229 477,229
- 0
- 0
109,474 109,474
11,783,127 11,783,127
12,920,041 12,920,041
647,318 647,318
11,870 11,870
11,865 11,865
12,624 12,624
11,442 11,442
12,624 12,624
42,043 42,043
12,801 12,801
12,801 12,801
151 151
396 396
396 396
396 396
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
492 492
247 247
36,234 36,234
42,562 42,562
36,070 36,070
21,815 21,815
399,522 399,522
42,562 42,562
28,883 28,883
79,565 79,565
79,565 79,565
91,287 91,287
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
49,619 49,619
16,540 16,540
16,540 16,540
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
1,241,167 1,241,167
1,930,930 1,930,930
2,047 2,047
- 0
9,622 9,622
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
420,823 420,823
385,825 385,825
215,058 215,058
361,807 361,807
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
15,264 15,264
133,597 133,597
148,527 148,527
278,638 278,638
152,189 152,189
56,473 56,473
193,680 193,680
104,980 104,980
58,226 58,226
102,442 102,442
- 0
- 0
- 0
- 0
- 0
- 0
- 0
287,975 287,975
296,751 296,751
246,589 246,589
309,135 309,135
1,803,522 1,803,522
882,717 882,717
1,097,582 1,097,582
1,149,178 1,149,178
7,678 7,678
- 0
7,494 7,494
8,264 8,264
7,263 7,263
6,861 6,861
114,791 114,791
103,578 103,578
422,127 422,127
625,356 625,356
468,702 468,702
717,677 717,677
92,685 92,685
315,996 315,996
143,921 143,921
624,574 624,574
64,935 64,935
144,860 144,860
69,629 69,629
77,941 77,941
81,284 81,284
95,146 95,146
112,634 112,634
41,035 41,035
348,588 348,588
- 0
- 0
29,943 29,943
44,192 44,192
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
63,663 63,663
347,312 347,312
44,532 44,532
8,373 8,373
5,356 5,356
7,002 7,002
151,187 151,187
- 0
279,093 279,093
- 0
151,187 151,187
220,282 220,282
200,929 200,929
301,414 301,414
108,552 108,552
198,086 198,086
205,192 205,192
125,606 125,606
125,606 125,606
17,298 17,298
151,898 151,898
94,341 94,341
44,082 44,082
17,597 17,597
9,070 9,070
56,623,024 56,623,024 3.8173
23,148,602 23,148,602
28,859,763 28,859,763
9,829,237 9,829,237
52,277,525 52,277,525
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
B. PERALATAN
Periksa lembar 1.2-2 260,300,000
3 Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux Method
Specific Gravity for Coarse Aggregate
Specific Gravity for Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor
4 Concrete Testing
Slump Cone
Cylinder/Cube Mould for Compressive Strength
Beam Mould for Flexural Strength (RIGID)
Crushing Machine
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT LS 1 100,000,000 100,000,000
1 Perkuatan Jembatan Lama
2 Pemeliharaan Jalan Kerja / Samping
3 ...................... ....
4 ...................... ....
5 ...................... ....
6 ...................... ....
Catatan :Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
B. PERALATAN
SATUAN PENGUKURAN :
HARGA SATUAN :
I. Laboratory Building
1. Laboratory Building m2
V. Peralatan pendukung
1 Mobil Pick Up
2 Komputer + Printer
3 Furniture
VI. Operasional
VII. Test Luar
Test Luar, sesuai kebutuhan atau atas
perintah Direksi
Catatan :
1. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi t
yang dibayar kontrak) dan biaya lain-lainnya.
2. Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsultan Pengawas.
Rambu Tetap
1 Rambu batas kecepatan buah
2 Rambu perintah mengikuti lajur buah
3 Rambu pengarah tikungan buah
4 Rambu larangan berjalan terus (give away) buah
5 Rambu larangan menyalip kendaraan lain buah
6 Rambu peringatan jalan licin buah
7 Rambu pengarah tikungan ganda buah
8 Rambu APILL buah
Catatan :
Kolom volume adalah jumlah kebutuhan zona di lapangan dikalikan kolom ZONA 1, 2, dstnya
contoh : misal di lapangan dibutuhkan dua ZONE 1
maka volume diisi dengan 2 dikali 8 = 16
ASILITAS LABORATORIUM
Lump sum
Rp. 55,940,000.00
HARGA
VOLUME TOTAL KETERANGAN
SATUAN
10,000,000.00
10,000,000.00
10,000,000.00
10,000,000.00
10,000,000.00
Rp 55,940,000.00
8 8 8 4
2 2
1
2
8 8 8 4
4 4 4 2
4 8 20 12 12
2 1 4 1 1
2 4
4
2
4 16 24 10 10
2 4 4 4 4
2 4
Biaya
VOLUME TOTAL KETERANGAN
mobilisasi
-
-
- lihat spesifikasi
-
-
-
-
-
-
-
-
- lihat spesifikasi
- lihat spesifikasi
- lihat spesifikasi
- lihat spesifikasi
- lihat spesifikasi
-
- lihat spesifikasi
ITEM PEMBAYARAN NO. : 1.8 (2)
JENIS PEKERJAAN : Pemasangan & Pemeliharaan Jembatan Sementara
HARGA JUMLAH
No. U RAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
Catatan : Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
No Jenis Peralatan Satuan Harga
Total 180,000.00
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT MIXING PLANT
2. Tenaga Pw 294.0
3. Kapasitas Cp 60.0
4. Alat a. Umur Ekonomis A 10.0
b. Jam Kerja Dalam 1 Tahun W 1,500.0
c. Harga Alat B 100.0
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
8 Bahan bakar Batubara 500.00
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINISHER
2. Tenaga Pw 72.4
3. Kapasitas Cp 10.0
4. Alat Baru : a. Umur Ekonomis A 6.0
b. Jam Kerja Dalam 1 Tahun W 1,400.0
c. Harga Alat B 100
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER
2. Tenaga Pw 4.0
3. Kapasitas Cp 850.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BULLDOZER 100-150 HP
2. Tenaga Pw 155.0
3. Kapasitas Cp -
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M
2. Tenaga Pw 60.0
3. Kapasitas Cp 5,000.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3
2. Tenaga Pw 20.0
3. Kapasitas Cp 500.0
4. Alat Baru : a. Umur Ekonomis A 2.0
b. Jam Kerja Dalam 1 Tahun W 1,500.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE 10-15 TON
2. Tenaga Pw 138.0
3. Kapasitas Cp 15.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
5.
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 10
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3.5 TON
2. Tenaga Pw 100.0
3. Kapasitas Cp 3.5
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir / Mekanik U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir / Mekanik U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP
2. Tenaga Pw 133.0
3. Kapasitas Cp 0.93
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan FLAT BED TRUCK 3-4 M3
2. Tenaga Pw 190.0
3. Kapasitas Cp 10.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR SET
2. Tenaga Pw 180.0
3. Kapasitas Cp 135.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan MOTOR GRADER >100 HP
2. Tenaga Pw 135.0
3. Kapasitas Cp 10,800.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TRACK LOADER 75-100 HP
2. Tenaga Pw 70.0
3. Kapasitas Cp 0.8
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3
2. Tenaga Pw 96.0
3. Kapasitas Cp 1.5
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 600,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan THREE WHEEL ROLLER 6-8 T
2. Tenaga Pw 55.0
3. Kapasitas Cp 8.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TANDEM ROLLER 6-8 T.
2. Tenaga Pw 82.0
3. Kapasitas Cp 8.1
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 10
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TIRE ROLLER 8-10 T.
2. Tenaga Pw 100.5
3. Kapasitas Cp 9.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER 5-8 T.
2. Tenaga Pw 82.0
3. Kapasitas Cp 7.050
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 10
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE VIBRATOR
2. Tenaga Pw 5.5
3. Kapasitas Cp 25.0
4. Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 1,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan STONE CRUSHER
2. Tenaga Pw 220.0
3. Kapasitas Cp 60.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 800,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan WATER PUMP 70-100 mm
2. Tenaga Pw 6.0
3. Kapasitas Cp -
4. Alat Baru : a. Umur Ekonomis A 3.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L.
2. Tenaga Pw 100.0
3. Kapasitas Cp 4,000.0
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan PEDESTRIAN ROLLER
2. Tenaga Pw 8.8
3. Kapasitas Cp 835.000
4. Alat Baru : a. Umur Ekonomis A 3.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TAMPER
2. Tenaga Pw 4.7
3. Kapasitas Cp 121.000
4. Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 1,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan JACK HAMMER
2. Tenaga Pw 0.0
3. Kapasitas Cp 1,330.000
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan FULVI MIXER
2. Tenaga Pw 345.0
3. Kapasitas Cp 2,005
4. Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 1,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TRAILER 20 TON
2. Tenaga Pw 175.0
3. Kapasitas Cp 20.00
4. Alat Baru : a. Umur Ekonomis A 6.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan PILE DRIVER + HAMMER
2. Tenaga Pw 25.0
3. Kapasitas Cp 2.50
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 35 TON
2. Tenaga Pw 125.0
3. Kapasitas Cp 35.00
4. Alat Baru : a. Umur Ekonomis A 6.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan WELDING SET
2. Tenaga Pw 40.0
3. Kapasitas Cp 250.00
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE
2. Tenaga Pw 150.0
3. Kapasitas Cp 2,000.00
4. Alat Baru : a. Umur Ekonomis A 6.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT LIQUID MIXER
2. Tenaga Pw 5.0
3. Kapasitas Cp 1,000.0
4. Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT LIQUID MIXER
2. Tenaga Pw 40.0
3. Kapasitas Cp 20,000.0
4. Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 100
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
SATUAN KET. TENAGA KAPASITAS
ALAT ALAT
HP Cp
1 2 2a 3 4
liter
1. ASPHALT MIXING PLANT E01 294.0 60.0
2. ASPHALT FINISHER E02 72.4 10.0
Rupiah 3. ASPHALT SPRAYER E03 4.0 850.0
4. BULLDOZER 100-150 HP E04 155.0 -
- 5. COMPRESSOR 4000-6500 L\M E05 60.0 5,000.0
6. CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500.0
7. CRANE 10-15 TON E07 138.0 15.0
Rupiah 8. DUMP TRUCK 3.5 TON E08 100.0 3.5
9. DUMP TRUCK 10 TON E09 190.0 10.0
10. EXCAVATOR 80-140 HP E10 133.0 0.9
Rupiah 11. FLAT BED TRUCK 3-4 M3 E11 190.0 10.0
12. GENERATOR SET E12 180.0 135.0
13. MOTOR GRADER >100 HP E13 135.0 10,800.0
Rupiah 14. TRACK LOADER 75-100 HP E14 70.0 0.8
15. WHEEL LOADER 1.0-1.6 M3 E15 96.0 1.5
16. THREE WHEEL ROLLER 6-8 T E16 55.0 8.0
Rupiah 17. TANDEM ROLLER 6-8 T. E17 82.0 8.1
Rupiah Khusus AMP 18. TIRE ROLLER 8-10 T. E18 100.5 9.0
19. VIBRATORY ROLLER 5-8 T. E19 82.0 7.1
20. CONCRETE VIBRATOR E20 5.5 25.0
21. STONE CRUSHER E21 220.0 60.0
Rupiah 22. WATER PUMP 70-100 mm E22 6.0 -
23. WATER TANKER 3000-4500 L. E23 100.0 4,000.0
24. PEDESTRIAN ROLLER E24 8.8 835.0
25. TAMPER E25 4.7 121.0
Rupiah 26. JACK HAMMER E26 0.0 1,330.0
27. FULVI MIXER E27 345.0 2,005.0
Rupiah 28. CONCRETE PUMP E28 100.0 8.00
Rupiah 29. TRAILER 20 TON E29 175.0 20.00
30 PILE DRIVER + HAMMER E30 25.0 2.50
Rupiah 31. CRANE ON TRACK 35 TON E31 125.0 35.00
32. WELDING SET E32 40.0 250.00
Rupiah 33. BORE PILE MACHINE E33 150.0 2,000.0
34. ASPHALT LIQUID MIXER E34 5.0 1,000.0
KETERANGAN : 1 Tingkat Suku Bunga
2 Upah Operator / Sopir / Mekanik
% / Tahun 3 Upah Pembantu Operator/Sopir/Me
Rp./Jam 4 Harga Bahan Bakar Bensin
Rp./Jam 5 Harga Bahan Bakar Solar
Rp./liter 6 Minyak Pelumas
Rp./liter 7 Pajak Pertambahan Nilai (PPN) dipe
Rp./liter 8 Khusus AMP, biaya bahan bakar dit
Rp/kg
TENAGA KAPASITAS
ALAT ALAT
LT FINISHER E02
HP
Ton HP Cp
Tahun 1 2 2a 3 4
Jam
Rupiah 35. TRONTON E35 150.0 15.0
36. COLD MILLING MACHINE E37 248.0 1,000.0
37. ROCK DRILL BREAKER E36 3.0 -
38. COLD RECYCLER E38 900.0 2,200.0
39. HOT RECYCLER E39 400.0 3.0
40. AGGREGAT (CHIP) SPREADER E40 115.0 3.5
Rupiah 41. ASPHALT DISTRIBUTOR E41 115.0 4,000.0
42. SLIP FORM PAVER E42 105.0 2.5
- 43. CONCRETE PAN MIXER E43 134.0 600.0
44. CONCRETE BREAKER E44 290.0 20.0
45. ASPAHLT TANKER E45 190.0 4,000.0
Rupiah 46. CEMENT TANKER E46 190.0 4,000.0
47. CONDRETE MIXER (350) E47 20.0 350.0
48. VIBRATING RAMMER E48 4.2 80.0
Rupiah 49. TRUK MIXER (AGITATOR) E49 220.0 5.0
50. BORE PILE MACHINE E50 125.0 60.0
51. CRANE ON TRACK 75-100 TON E51 200.0 75.0
Rupiah 52. BLENDING EQUIPMENT E52 50.0 30.0
53. ASPHALT LIQUID MIXER E34a 40.0 20,000.0
54. BAR BENDER E53 3.0 0.0
55. BAR CUTTER E54 3.0 0.0
Rupiah 56. BREAKER E55 80.0 3.0
57. GROUTING PUMP E56 100.0 15.0
Rupiah 58. JACK HIDROLIC E57 3.0 150.0
59. MESIN LAS E58 3.0 0.2
60. PILE DRIVER LEADER, 75 kw E59 70.0 75.0
61. PILE HAMMER E60 10.0 0.0
62. PILE HAMMER, 2,5 Ton E61 1.0 2.50
Rupiah 63. STRESSING JACK E62 89.0 15.00
64. WELDING MACHINE, 300 A E63 5.0 0.00
65.
Rupiah 66.
Rupiah 67.
68.
Rupiah KETERANGAN : 1 Tingkat Suku Bunga
2 Upah Operator / Sopir / Mekanik
Rupiah 3 Upah Pembantu Operator/Sopir/Me
4 Harga Bahan Bakar Bensin
5 Harga Bahan Bakar Solar
6 Minyak Pelumas
% / Tahun 7 Pajak Pertambahan Nilai (PPN) dipe
Rp./Jam 8 Khusus AMP, biaya bahan bakar dit
Rp./Jam 9 AMP , Aspal Sprayer, Aspal Distribu
Liter
Liter
Liter
SATUAN KET.
LT SPRAYER E03
HP
Liter
Tahun
Jam
Rupiah
Liter
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
ER 100-150 HP E04
HP
-
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
RUCK 10 TON E09
HP
Ton
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
OR 80-140 HP E10
HP
M3
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
TE VIBRATOR E20
HP
-
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
CRUSHER E21
HP
T/Jam
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
MP 70-100 mm E22
HP
-
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
MPER E25
HP
Ton
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
HAMMER E26
HP
-
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
VI MIXER E27
HP
-
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
RETE PUMP E28
HP
M3
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
ER 20 TON E29
HP
Ton
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
ER + HAMMER E30
HP
Ton
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
LE MACHINE E33
HP
Meter
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
#REF!
ANALISA BIAYA SEWA P
KAPASITAS HARGA ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER
ALAT ALAT JAM SISA PENGEM- BIAYA
UMUR KERJA HARGA ALAT BALIAN PENGEM-
ALAT 1 TAHUN ALAT MODAL BALIAN
MODAL
- (Tahun) (Tahun) (Jam) (Rp.) (Rp.) - (Rp.)
i(1+i)^A (B - C) x D
(10% X B) ----------- -----------
(1+i)^A-1 W
Cp B A W B C D e1
4 5 6 7 8 9 10 11
KAPASITAS HARGA ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER
ALAT ALAT JAM SISA PENGEM- BIAYA
i(1+i)^A (B - C) x D
(10% X B) ----------- -----------
(1+i)^A-1 W
Cp B A W B C D e1
4 5 6 7 8 9 10 11
= 10.00 % per-tahun
erator / Sopir / Mekanik = 4,179 Rupiah per-orang/jam
mbantu Operator/Sopir/Mekanik = 3,708 Rupiah per-orang/jam
ahan Bakar Bensin = 5,834 Rupiah per-liter
ahan Bakar Solar = 6,548 Rupiah per-liter
= 18,000 Rupiah per-liter
rtambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x H
pal Sprayer, Aspal Distribusi ditambah bahan bakar untuk pemanasan Aspal = 1/1000 x Kapasitas tangki aspal x harga bahan bakar so
ALISA BIAYA SEWA PERALATAN PER JAM KERJA (I)
BIAYA
SEWA KET.
ALAT/JAM
(di luar PPN)
3,959,664.02
118,098.26
18,396.47
199,436.48
82,035.29
38,332.25
178,427.84
131,467.37
242,689.55
172,248.83
242,689.55
230,331.53
174,720.44
94,393.31
262,099.45
75,856.28
109,222.93
132,085.27
109,222.93
16,259.58
464,238.53
15,301.98
131,467.37
18,762.23
15,041.78
7,887.17
533,064.31
131,467.36
224,152.51
38,782.22
162,362.41
57,319.25
193,257.46
14,066.18
243,640.76
321,781.78
19,869.64
1,127,524.68
509,623.68
190,361.95
157,420.11
145,062.09
219,284.72
373,685.46
268,882.94
242,689.54
32,603.22
14,280.66
279,763.61
198,168.73
255,047.57
83,999.78
57,319.25
8,746.08
8,746.08
106,751.33
131,467.37
11,594.57
12,453.97
94,393.29
23,109.74
9,122.95
117,873.55
14,066.16
ITEM PEMBAYARAN : AGREGAT KASAR & HALUS untuk bahan lapis Agregat dan lapis Aspal
JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3
I ASUMSI
1 Bahan dasar Sirtu (material Batu bercampur pasir) diterima di lokasi Alat
Pemecah Batu (di Base Camp)
2 Kegiatan dilakukan di dalam lokasi Base Camp
4 Berat Isi Bahan : - Batu / Gravel D1
- Pasir D2
- Batu Pecah D3
5 Harga Satuan Bahan Dasar : - Batu Kali Rp1
- Sirtu Rp2
6 Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) Rp3
- Wheel Loader Rp4
7 Kapasitas Alat : - Pemecah Batu (Stone Crusher) Cp1
- Wheel Loader Cp2
8 Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) Fa1
- Wheel Loader Fa2
9 Faktor Kehilangan Material Fh
II METHODE PELAKSANAAN
1 Wheel Loader mengangkut Sirtu dari tumpukan
dan menuangkannya ke Alat Pemecah Batu.
2 Bahan dasar yang digunakan Sirtu (material Batu bercampur kerikil dan pasir)
3 Dilokasi hooper/Feeder dipasang penyiram air (water sprayer)
berfungsi sebagai pencucian bahan dari kotoran (lumpur)
4 Setelah disemprot air Sirtu dimasukkan kedalam pemecah pertama
(primary crusher) kapasitas 60 ton/jam (bukaan Jaw 10 cm s.d 20 cm tergantung
ukuran boulder)
6 Hasil Primary Crusher disaring memakai Scalping Screen(screen 1) dengan
ukuran ayakan #1,5 inch (3,75 cm) atau #2,0 inch (5,00 cm)
yg menghasilkan lolos ayakan agregat ukuran (0 - 50) dan tdk lolos agg.(50 - 200)
Asumsi material yang lolos saringan (screen1)
Asumsi keseluruhannya menghasilkan ukuran (0 - 50)
7 Hasil yang lolos saringan(screen1) sebagai fraksi halus tidak boleh dipakai
langsung untuk bahan campuran lapisan perkerasan aspal, tetapi dapat digunakan
untuk bahan campuran Agregat kelas B dan S, khusus untuk Agregat A yang
digunakan hanya ukuran (0 - 5)
8 Hasil yang tidak lolos screen1 dimasukan ke pemecah kedua (Secondary Crusher)
kemudian dipisahkan mempergunakan Screen2 yang menghasilkan ukuran
(0 - 5), (5 - 3/8"=9,50mm) dan (3/8" - 3/4"=19mm atau 1"=2,54mm))
yang dapat langsung digunakan untuk kebutuhan Agregat Kasar Lapis pondasi
Agregat A (ukuran 5 - 1") dan Agg.Kasar dan Agg.Halus lapisan perkerasan Aspal
Asumsi proporsi hasil pemisahan saringan (screen2)
- menghasilkan ukuran (0 - 5)
- menghasilkan ukuran (5 - 3/8"=9,5mm)
- menghasilkan ukuran (3/8" - 3/4"=19mm)
9 Hasil yang tidak lolos dimasukan kedalam pemecah ketiga (Tertiary crusher)
atau (secondary Crusher) dan hasilnya dimasukan kembali ke saringan screen2
1.c. Biaya Produksi Batu Pecah stone crusher 1 set dgn wheel loader
= {(Tst x Rp3) + (Tw x Rp4)} Bp
IV PERHITUNGAN
1 Primary Crusher
Produksi Primary Crusher + scalping Screen 1 Prod
Lolos scalping screen (sreen1) LSc 1
Tidak lolos scalping screen(screen1) ( 100 - LSc 1 ) TLSc1
Asumsi % Biaya proses scalping screen ukuran # 2"=50 mm thdp biaya produksi LSc2
Biaya Produksi scalping Screen BPSc
Volume (0 - 50) = ((Prod x LSc 1) x LSc2))/D1 V1
2 Secondary Crusher
Produksi Secondary Crusher + scalping Screen 2 Prod
Asumsi % Biaya proses produksi Batu Pecah thdp BOP S.Crusher 1 set LSc3
Biaya Produksi = LSc3 : 100 x BP + BPSc : 2 Bprod
kapasitas yang diproduksi = Prod x TLSc1/100 : D3 CpSC1
Lolos screen2 ukuran ( 0 - 5) LSc4
Volume ukuran ( 0 - 5) = (CpSC1 x LSc4/100) V2
Lolos screen2 ukuran ( 5 - 9,5) LSc5
Volume ukuran ( 5 - 9,5) = (CpSC1 x LSc5/100) V3
Lolos screen2 ukuran ( 9.5 - 19,0) LSc6
Volume ukuran ( 9,5 - 19.0) = (CpSC1 x LSc6/100) V4
Secondary Crusher
Asumsi %Biaya produksi per fraksi (untuk tiap lengan conveyor 1/3 biaya produksi) LSc2
Biaya Produksi per Fraksi = Hs 1 : 3 PF
Agregat pecah mesin ( 0 - 5) = PF : V2 + Rp2 Hs2
Agregat pecah mesin (5 - 9.5) = PF : V3 + Rp2 Hs3
Agregat pecah mesin (9.5 - 19) = PF : V4 + Rp2 Hs4
20 %
8.74 m3 72
80 %
38.96 m3
20 %
30 %
50 %
1.00 Jam
34.09 M3/Jam Batu pecah
40.38 M3/Jam
1.25 M3
2.00 menit
1.08 Jam
747,633.06 Rp./Jam
887,192.60 Rp.
60.00 Ton/Jam
20.00 %
80.00 %
20.00 %
149,526.61 Rp.
8.74 m3
48.00 Ton/Jam
80.00 %
672,869.76 Rp.
38.96 m3
20.00 %
7.79 m3
30.00 %
11.69 m3
50.00 %
19.48 m3
133,554.17 Rp
33.33 %
295,730.87 Rp.
162,952.13 Rp./M3
150,301.42 Rp./M3
140,180.85 Rp./M3
143,976.06
ITEM PEMBAYARAN : AGREGAT KELAS A (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Kasar APK 69.85 %
- Aggregat Halus Lapis pondasi A PU 30.15 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Faktor kehilangan - Agregat Pecah Kasar Fh1 1.05
- Aggregat Halus Lapis pondasi A Fh2 1.05
1. BAHAN
Agregat Pecah Kasar = APK x 1 M3 x Fh1 M92 0.7334 M3
Aggregat Halus Lapis pond A = PU x 1 M3 x Fh2 M44 0.3166 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat blending T1 2.00 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
RAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : AGREGAT KELAS A (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
…………………
……………………………………..
…………………
:
:
:
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 293.40
7,281.29 229.35
0.00
143,976.06 105,595.64
133,554.17 42,279.91
262,099.45 8,255.75
83,999.78 4,048.18
0.00 0.00
ALATAN ( A + B + C ) 160,702.24
ITEM PEMBAYARAN : AGREGAT KELAS B (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B
SATUAN PEMBAYARAN : M3
I ASUMSI
1 Bahan Agregat Halus & Kasar diterima di lokasi
Base Camp
2 Jarak dari stockpile ke alat blending l
3 Jam kerja effektif perhari Tk
4 Kegiatan dilakukan di dalam lokasi Base Camp
5 Berat isi padat Bip
6 Jam kerja efektif per-hari Tk
8 Proporsi Campuran : Fraksi lolos Scalping Screen 0 - 50 mm 20-30
Fraksi lolos Scalping Screen 0 - 50 mm St
9 Berat volume agregat (lepas) Bil
- Agregat Pecah Mesin 20 - 30 mm Fh1
- Agregat Pecah Mesin 5 - 10 & 10 - 20 Fh2
Fraksi lolos Scalping Screen 0 - 50 mm Fh3
II URUTAN PEKERJAAN
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor Efisiensi alat Fa
Waktu Siklus :
- Waktu pemuatan alat belending T1
Ts1
Koefisien Alat / M3 = 1 : Q2
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1
Produksi Agregat / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I ASUMSI
1 Bahan Agregat Halus & Kasar diterima di lokasi
Base Camp
2 Jarak dari stockpile ke alat blending l
3 Jam kerja effektif perhari Tk
4 Kegiatan dilakukan di dalam lokasi Base Camp
5 Berat isi padat Bip
6 Jam kerja efektif per-hari Tk
8 Proporsi Campuran : Agregat Pecah Kasar 20-30
Agregat Lolos # 1 " 5-10&10-20
- Fraksi lolos Scalping 0 - 37,5 mm St
Screen 0 - 37,5 mm
9 Berat volume agregat (lepas) Bil
Agregat Pecah Kasar Fh1
Agregat Lolos # 1 " Fh2
- Fraksi lolos Scalping 0 - 37,5 mm Fh3
Screen 0 - 37,5 mm
II URUTAN PEKERJAAN
Ts1
Koefisien Alat / M3 = 1 : Q2
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1
Produksi Agregat / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTU
PEREKAMAN ANALISA MASING-MASING
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
PROP / KAB / KODYA : ………………………………………………
50.00 M ITEM PEMBAYARAN NO. : AGREGAT KELAS B (kondisi lepas)
7.00 jam JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B
SATUAN PEMBAYARAN : M3
1.81
7.00 jam
39.60 % Gradasi harus
60.40 % memenuhi NO. KOMPONEN SATUAN
1.51 ton/m3 Spesifikasi
1.05
1.05
1.05 A. TENAGA
B. BAHAN
1.50 M3 (lepas)
0.85 - kondisi sedang C. PERALATAN
0.83 - 1. Wheel Loader (E15) jam
2. Blending Equpment (E52) jam
2.00 menit jarak 50 meter 3 Alat Bantu Ls
2.00 menit
31.75 M3 padat
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A +
0.0315 jam
25.00 M3/jam
0.83
20.75 M3
0.0482 jam
31.75 M3/Jam
222.23 M3
2.00 orang
1.00 orang
0.0630 Jam
0.0315 Jam
PROYEK :
No. PAKET KONTRAK : ………………………………………………
50.00 M NAMA PAKET : …………………………………………………
7.00 jam PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : AGREGAT KELAS S
1.81 JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS S
7.00 jam SATUAN PEMBAYARAN : M3
18.00 % Gradasi harus
18.30 % memenuhi
63.70 % Spesifikasi
NO. KOMPONEN SATUAN
1.51 ton/m3
1.05
1.05
1.05 A. TENAGA
B. BAHAN
2.00 menit
0.0315 jam
25.00 M3/jam
0.83
20.75 M3
0.0482 jam
31.75 M3/Jam
222.23 M3
2.00 orang
1.00 orang
0.0630 Jam
0.0315 Jam
FORMULIR STANDAR UNTUK
ANALISA MASING-MASING HARGA SATUAN
……………………………………
………………………………………………………..
……………………………………
AT KELAS B (kondisi lepas) :
DAAN AGREGAT KELAS B :
:
……………………………………
………………………………………………………..
……………………………………
:
DAAN AGREGAT KELAS S :
:
I ASUMSI
1 Bahan Agregat Kasar, Pasir dan Tanah diterima di lokasi
Base Camp
2 Kegiatan dilakukan di dalam lokasi Base Camp
3 Proporsi campuran : - Agregat Kasar Ak 32.50 %
- Pasir Ps 67.50 %
II METHODE PELAKSANAAN
KETERANGAN
Kap. Bucket
Di luar PPN
ITEM PEMBAYARAN : LAPIS PONDASI AGREGAT (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN LAPIS PONDASI AGREGAT (CBR 60%)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATU
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.20 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : Agregat Pecah Kasar A20-30 24.00 %
Agregat Lolos # 1 " A5-10&10-20 21.24 %
Fraksi lolos Scalping 0 - 37,5 mm St 54.76 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Faktor kehilangan Agregat Pecah Kasar Fh1 1.05
Agregat Lolos # 1 " Fh2 1.05
Fraksi lolos Scalping 0 - 37,5 mm Fh3 1.05
1. BAHAN
Agregat Pecah Kasar = "20-30" x 1 M3 x Fh1 M93 0.2520 M3
Agregat Lolos # 1 " = "5-10 & 10-20" x 1 M3 x Fh2 M92 0.2230 M3
Fraksi lolos Scalping 0 = St x 1 M3 x Fh3 M16 0.5750 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat blending T1 2.00 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.10 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat blending T1 2.00 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
RAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : LAPIS PONDASI AGREGAT (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN LAPIS PONDASI AGREGAT (CBR 60%)
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0315
2. Blending Equpment (E52) jam 0.0482
3 Alat Bantu Ls 1.0000
(lepas)
kondisi sedang JUMLAH HARGA PERALATAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : LAPIS PERMUKAAN AGREGAT (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN LAPIS PERMUKAAN AGREGAT (CBR 60%)
SATUAN PEMBAYARAN : M3
PERKIRAAN
Gradasi harus NO. KOMPONEN SATUAN KUANTITAS
memenuhi Spec.
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0315
2. Blending Equpment (E52) jam 0.0482
3 Alat Bantu Ls 1.0000
(lepas)
kondisi sedang JUMLAH HARGA PERALATAN
padat
TANDAR UNTUK
SING-MASING HARGA SATUAN
…………………
……………………………………..
…………………
GAT (kondisi lepas) :
NDASI AGREGAT (CBR 60%) :
:
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 293.40
7,281.29 229.35
143,976.06 36,281.97
150,301.42 33,520.22
140,180.85 80,601.19
262,099.45 8,255.75
83,999.78 4,048.18
0.00 0.00
ALATAN ( A + B + C ) 163,230.06
TANDAR UNTUK
SING-MASING HARGA SATUAN
…………………
……………………………………..
…………………
REGAT (kondisi lepas) :
RMUKAAN AGREGAT (CBR 60%) :
:
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 293.40
7,281.29 229.35
JUMLAH HARGA TENAGA 522.75
143,976.06 68,935.74
81,700.00 46,667.04
262,099.45 8,255.75
83,999.78 4,048.18
0.00 0.00
ALATAN ( A + B + C ) 128,429.46
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia setelah menerima SPMK mengusulkan personil
Tenaga Ahli Mutu Pekerjaan sbg Manajer Kendali Mutu
2 Tenaga Ahli dibantu oleh Asisten Kendali Mutu yang
berpengalaman dibidangnya dan tenaga pendukung
3 Membuat RMK dan laporan mutu yg disetujui PPK
4 Melakukan pengendalian mutu semua pekerjaan dan
membuat laporan secara berkala
C. TENAGA / PERSONIL
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shift
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan
D. TENAGA / PERSONIL
Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia memobilisasi peralatan pengeboran kelokasi yang
telah disetujui oleh PPK
2 Pengeboran dilakukan dengan mengambil SPT dan sampel
tanah terganggu (Disturb) dengan interval mak.2 meter atau
setiap ada perubahan strata tanah
3 Benda uji diambil dan dilakukan pengujian laboratorium
Pengeboran dilakukan hingga mencapai tanah keras atau
SPT hingga nilai >40
4 Dibuat laporan hasil pengujian
D. TENAGA/PERSONIL
Estimasi kedalaman boring per titik M 40.00
1 Tenaga Ahli Pengeboran OH 3.00
2 Tenaga Pendukung OH 9.00
3 Mobilisasi dan Demobilisasi Tenaga Ls 1.00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia memobilisasi peralatan sondir kelokasi yang
telah disetujui oleh PPK
2 Sondir dilakukan untuk mengukur tahanan ujung dan
hambatan akibat gesekan dengan interval 0,20m sampai
tahanan ujung mak.sebesar 250 Kg/Cm2
3 Dibuat laporan hasil pengujian
D. TENAGA/PERSONIL
Estimasi kedalaman boring per titik M 30.00
1 Tenaga Ahli Sondir OH 1.00
2 Tenaga Pendukung OH 4.00
3 Mobilisasi dan Demobilisasi Tenaga Ls 1.00
E TOTAL BIAYA SONDIR TERMASUK LAPORAN
F OVERHEAD & PROFIT ( 10% x E)
G TOTAL HARGA PEKERJAAN ( E + F )
H HARGA SATUAN SONDIR DAN LAPORAN PER METER
Catatan : 1. Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
2. Biaya tersebut sudah termasuk biaya peralatan pengeboran, pengujian laboratorium dan
pelaporan hasil pengeboran serta tenaga pengeboran
3. Biaya satuan tersebut sudah termasuk kebutuhan material pendukung dan peralatan yang
diperlukan termasuk bahan bakar, bahan habis dipakai dan operator.
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengujian lingkungan
(air, udara dan kebisingan)
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
D Biaya Operasional
Biaya peralatan Ls
Personil Ls
Transportasi Ls
Catatan :
Analisa El - 121
SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
11,000,000.00 132,000,000.00
6,000,000.00 72,000,000.00
2,000,000.00 24,000,000.00
300,000.00 3,600,000.00
231,600,000.00
u pekerjaan
ndukung yang
Analisa El - 18
SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
125,000.00 250,000.00
125,000.00 50,000,000.00
345,000.00 1,380,000.00
95,000.00 760,000.00
75,000.00 900,000.00
450,000.00 1,800,000.00
140,000.00 1,120,000.00
140,000.00 1,120,000.00
12,000.00 4,800,000.00
9,000.00 2,700,000.00
1,500,000.00 3,000,000.00
0.00 -
2,000,000.00 72,000,000.00
3,000,000.00 36,000,000.00
175,830,000.00
ndukung yang
Analisa El - 1201
SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
2,000,000.00 2,000,000.00
1,000,000.00 1,000,000.00
125,000.00 5,000,000.00
75,000.00 1,500,000.00
75,000.00 1,500,000.00
200,000.00 4,000,000.00
500,000.00 500,000.00
0.00 -
200,000.00 600,000.00
100,000.00 900,000.00
1,500,000.00 1,500,000.00
18,500,000.00
1,850,000.00
20,350,000.00
508,750.00
ad dan laba
Analisa El - 1202
SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
1,200,000.00 1,200,000.00
500,000.00 500,000.00
125,000.00 3,750,000.00
1,500.00 225,000.00
250,000.00 250,000.00
0.00 -
200,000.00 200,000.00
100,000.00 400,000.00
500,000.00 500,000.00
7,025,000.00
702,500.00
7,727,500.00
257,583.33
ad dan laba
Analisa El - 117
SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
15,504,000.00
197,000.00 788,000.00
210,000.00 840,000.00
250,000.00 1,000,000.00
230,000.00 920,000.00
213,000.00 852,000.00
192,000.00 768,000.00
14,760,000.00
480,000.00 1,920,000.00
750,000.00 3,000,000.00
9,816,000.00
10,000.00 40,000.00
40,000.00 160,000.00
55,000.00 220,000.00
55,000.00 220,000.00
150,000.00 600,000.00
80,000.00 320,000.00
200,000.00 800,000.00
128,000.00 512,000.00
90,000.00 360,000.00
10,000.00 40,000.00
40,080,000.00
ITEM PEMBAYARAN NO. : 2.1.(1)
JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume bahan D 1.60 Ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 132.33 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 926.28 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0302 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0076 Jam
Rp. 21,693.45 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Pasir & Semen : - Volume Semen Sm 20 %
: - Volume Pasir Ps 80 %
7 Perbandingan Batu & Mortar :
- Batu Bt 60 %
- Mortar (campuran semen & pasir) Mr 40 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu D2 1.60 ton/M3
- Adukan (mortar) D3 1.80 ton/M3
- Pasir D4 1.67 ton/M3
- Semen Portland D5 1.44 ton/M3
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.1 M3
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 0.1120
x {D5 x (1000)} (M12) 161 Kg
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01) 0.4829 M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 Liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1 5.00 menit
- Mengaduk T2 3.00 menit
- Menuang T3 1.00 menit
- Menunggu, dll. T4 1.00 menit
Ts1 10.00 menit
3. TENAGA
Produksi Pas. Batu yang menentuka ( Prod. C. Mixer ) Q1 2.49 M3/Jam
Produksi Pasangan Batu dalam 1 hari = Tk x Q1 Qt 17.43 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.2048 jam
- Pekerja = (Tk x P) : Qt (L01) 4.0161 jam
Rp. 345,340.73 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.45 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal gorong-gorong tg 6.50 Cm
3. TENAGA
Produksi Gorong-gorong / hari Qt 15.00 M'
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Tukang T 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M1 :
Pekerja = (Tk x P) : Qt (L01) 2.3333 Jam
Tukang = (Tk x T) : Qt (L02) 0.9333 Jam
Mandor = (Tk x M) : Qt (L03) 0.4667 Jam
3. TENAGA
Produksi Gorong-gorong / hari Qt 10.00 M'
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Tukang T 2.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 1.00 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal gorong-gorong tg 8.50 Cm
3. TENAGA
Produksi Gorong-gorong / hari Qt 4.00 M'
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Tukang T 1.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 1.20 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal gorong-gorong tg 10.00 Cm
3. TENAGA
Produksi Gorong-gorong / hari Qt 4.00 M'
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Tukang T 1.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter dalam gorong-gorong baja d 1.00 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal gorong-gorong tg 0.25 Cm
7 BJ Pipa Baja Bergelombang BJp 7.90 T/m3
BJp1 0.12445 T/m'
II. URUTAN KERJA
1 Gorong-gorong baja diterima dari pemasok
di lokasi pekerjaan
3 Dasar gorong-gorong digali sesuai kebutuhan dan ma-
terial backfill dipadatkan dengan Tamper
4 Tebal lapis porus pada dasar gorong-gorong baja tp 0.15 M
5 Material pilihan untuk penimbunan kembali (padat)
6 Sekelompok pekerja akan melaksanakan pekerjaan
dengan cara manual dengan menggunakan alat bantu
2. ALAT
2.a. TAMPER (untuk pemadatan lapis dasar) (E25)
Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Tebal lapis hamparan tp 0.15 M
3. TENAGA
Produksi Gorong-gorong / hari Qt 1.30 Ton
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Tukang T 1.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.20 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal gorong-gorong tg 6.50 Cm
2. ALAT
2.a. TAMPER (tebal lapis porous) (E25)
Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Tebal lapis hamparan tp 0.10 M
3. TENAGA
Produksi Gorong-gorong / hari Qt 20.00 M'
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Tukang T 0.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M1 :
- Pekerja = (Tk x P) : Qt (L01) 1.7500 Jam
- Tukang = (Tk x T) : Qt (L02) 0.0000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.3500 Jam
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.25 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal gorong-gorong tg 6.50 Cm
2. ALAT
2.a. TAMPER (tebal lapis porous) (E25)
Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Tebal lapis hamparan tp 0.10 M
3. TENAGA
Produksi Gorong-gorong / hari Qt 20.00 M'
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Tukang T 0.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M1 :
- Pekerja = (Tk x P) : Qt (L01) 1.7500 Jam
- Tukang = (Tk x T) : Qt (L02) 0.0000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.3500 Jam
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Diameter bagian dalam gorong-gorong d 0.30 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal gorong-gorong tg 6.50 Cm
2. ALAT
2.a. TAMPER (tebal lapis porous) (E25)
Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Tebal lapis hamparan tp 0.10 M
3. TENAGA
Produksi Gorong-gorong / hari Qt 20.00 M'
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Tukang T 0.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M1 :
- Pekerja = (Tk x P) : Qt (L01) 1.7500 Jam
- Tukang = (Tk x T) : Qt (L02) 0.0000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.3500 Jam
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di
Base Camp seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Kadar Semen Minimum Ks 340 Kg/M3
7 Maksimum ukuran agregat Ag 19 mm
8 Perbandingan Air dengan Semen Wcr 0.50 -
9 Perbandingan Campuran : Semen Sm 360.0 Kg/M3
: Pasir Ps 650.0 Kg/M3
: Agregat Kasar Kr 990.0 Kg/M3
10 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
11 Berat Isi : - Beton D1 2.40 Ton/M3
- Semen D2 1.25 Ton/M3
- Pasir D3 1.30 Ton/M3
- Agregat Kasar D4 1.40 Ton/M3
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1147 Jam
- Tukang = (Tk x Tb) : Qt (L02) 0.8032 Jam
- Pekerja = (Tk x P) : Qt (L01) 4.0161 Jam
Rupiah 216,445.00 / M1
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di
Base Camp seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Kadar Semen Minimum Ks 340 Kg/M3
7 Maksimum ukuran agregat Ag 19 mm
8 Perbandingan Air dengan Semen Wcr 0.50 -
9 Perbandingan Campuran : Semen Sm 360.0 Kg/M3
: Pasir Ps 650.0 Kg/M3
: Agregat Kasar Kr 990.0 Kg/M3
10 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
11 Berat Isi :
- Beton D1 2.40 Ton/M3
- Semen D2 1.25 Ton/M3
- Pasir D3 1.30 Ton/M3
- Agregat Kasar D4 1.40 Ton/M3
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1147 Jam
- Tukang = (Tk x Tb) : Qt (L02) 0.8032 Jam
- Pekerja = (Tk x P) : Qt (L01) 4.0161 Jam
Rupiah 252,519.00 / M1
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di
Base Camp seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Kadar Semen Minimum Ks 340 Kg/M3
7 Maksimum ukuran agregat Ag 19 mm
8 Perbandingan Air dengan Semen Wcr 0.50 -
9 Perbandingan Campuran : Semen Sm 360.0 Kg/M3
: Pasir Ps 650.0 Kg/M3
: Agregat Kasar Kr 990.0 Kg/M3
10 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
11 Berat Isi : - Beton D1 2.40 Ton/M3
- Semen D2 1.25 Ton/M3
- Pasir D3 1.30 Ton/M3
- Agregat Kasar D4 1.40 Ton/M3
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1147 Jam
- Tukang = (Tk x Tb) : Qt (L02) 0.8032 Jam
- Pekerja = (Tk x P) : Qt (L01) 4.0161 Jam
Rupiah 303,023.00 / M1
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Material untuk pembuatan saluran dari beton berada di
Base Camp seperti agregat, pasir, semen dan besi.
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Kadar Semen Minimum Ks 340 Kg/M3
7 Maksimum ukuran agregat Ag 19 mm
8 Perbandingan Air dengan Semen Wcr 0.50 -
9 Perbandingan Campuran : Semen Sm 360.0 Kg/M3
: Pasir Ps 650.0 Kg/M3
: Agregat Kasar Kr 990.0 Kg/M3
10 Faktor Kehilangan Bahan (Fh) : Semen Fh1 1.03
: Pasir + Agregat Fh2 1.05
11 Berat Isi : - Beton D1 2.40 Ton/M3
- Semen D2 1.25 Ton/M3
- Pasir D3 1.30 Ton/M3
- Agregat Kasar D4 1.40 Ton/M3
2. PERALATAN
2.a. BETON MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 5.00 Menit
- Mengaduk T2 3.00 Menit
- Menuang T3 1.00 Menit
- Tunggu, dll. T4 1.00 Menit
Ts 10.00 Menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 17.43 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1147 Jam
- Tukang = (Tk x Tb) : Qt (L02) 0.8032 Jam
- Pekerja = (Tk x P) : Qt (L01) 4.0161 Jam
Rupiah 757,392.88 / M1
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.05 -
1. BAHAN
1.a. Baja Tulangan (Polos) U32 (M57a) 1.0500 Kg
1.b. Kawat beton (M14) 0.0200 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 10,886.66 / Kg
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu dan pasir) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan material Fh 1.10 -
1. BAHAN
1.a. Batu Belah (M06) 1.1000 M3
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gerobak Dorong = 4 buah
- Palu Batu = 2 buah
3. TENAGA
Produksi pasangan batu kosong dalam 1 hari Qt 8.00 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.8750 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.7500 jam
- Pekerja = (Tk x P) : Qt (L01) 5.2500 jam
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Rp. 205,707.73 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan terpengaruh oleh aliran air tanah
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan material Fh 1.10 -
6 Material Porous terdiri dari batu pecah dan pasir
2. ALAT
2.a. TAMPER (E25)
Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan b 0.50 M
Banyak lintasan n 10 lintasan
3. TENAGA
Produksi yang dapat diselesaikan / hari Qt 10.00 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.8000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.7000 Jam
Rp. 91,187.79 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan terpengaruh oleh aliran air tanah
4 Jam kerja efektif per-hari Tk 7.00 Jam
2. ALAT
2.b. ALAT BANTU
Diperlukan alat-alat bantu kecil : alat pemotong, dll.
3. TENAGA
Produksi yang dapat diselesaikan / hari Qt 25.00 M2
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Tukang T 1.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M2
- Pekerja = (Tk x P) : Qt (L01) 0.5600 Jam
- Tukang = (Tk x T) : Qt (L02) 0.2800 Jam
- Mandor = (Tk x M) : Qt (L03) 0.2800 Jam
Rp. 25,416.90 / M2
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan terpengaruh oleh aliran air tanah
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Diameter dalam pipa d 0.10 M
6 Material penyaring terdiri dari material porus
7 Penyangga sambungan pipa dengan mortar
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.1.(1)
JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Sal
SATUAN PEMBAYARAN : M3 0
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
Faktor Konversi
masuk dalam
waktu siklus
disesuaikan dgn
lapangan
JUMLAH HARGA BAHAN
C. PERALATAN
Analisa EI-211
KETERANGAN
Analisa EI-221
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.2.(1)
JENIS PEKERJAAN : Pasangan Batu dengan Mortar
SATUAN PEMBAYARAN : M3
Kuat Tekan min.
50 kg/cm2
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
Lepas
C. PERALATAN
Analisa EI-221
KETERANGAN
Analisa EI-231
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.3.(1)
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang,
SATUAN PEMBAYARAN : M1 0
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
B. BAHAN
C. PERALATAN
1. Tamper (E25) jam 1.0091
2. Flat Bed Truck (E11) jam 0.0785
3. Alat Bantu Ls 1.0000
Analisa EI-231
KETERANGAN
Lump Sump
Analisa EI-232
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.3.(2)
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang,
SATUAN PEMBAYARAN : M1 0
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
B. BAHAN
C. PERALATAN
Analisa EI-232
KETERANGAN
Lump Sump
Analisa EI-233
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.3.(3)
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang,
SATUAN PEMBAYARAN : M1
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
B. BAHAN
C. PERALATAN
Analisa EI-233
KETERANGAN
Analisa EI-234
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.3.(4)
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Bertulang,
SATUAN PEMBAYARAN : M1
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
B. BAHAN
C. PERALATAN
Analisa EI-234
KETERANGAN
Lump Sump
Analisa EI-235
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.3.(5)
JENIS PEKERJAAN : Gorong2 Pipa Baja Bergelombang
SATUAN PEMBAYARAN : Ton
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-235
KETERANGAN
10.00
M' per hari
Analisa EI-236
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.3.(6)
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tula
SATUAN PEMBAYARAN : 2.3.(6) 0
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
Sand bedding
1. Pekerja (L01) jam 1.7500
2. Tukang (L02) jam 0.0000
3. Mandor (L03) jam 0.3500
Diperhitungkan
hanya tamper JUMLAH HARGA PERALATAN
Analisa EI-236
KETERANGAN
Lump Sump
Analisa EI-237
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.3.(7)
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tula
SATUAN PEMBAYARAN : M1 0
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
Sand bedding
1. Pekerja (L01) jam 1.7500
2. Tukang (L02) jam 0.0000
3. Mandor (L03) jam 0.3500
B. BAHAN
Diperhitungkan
hanya tamper JUMLAH HARGA PERALATAN
Analisa EI-237
KETERANGAN
Lump Sump
Analisa EI-238
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.3.(8)
JENIS PEKERJAAN : Gorong-gorong Pipa Beton Tanpa Tula
SATUAN PEMBAYARAN : M1 0
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
Sand bedding
1. Pekerja (L01) jam 1.7500
2. Tukang (L02) jam 0.0000
3. Mandor (L03) jam 0.3500
B. BAHAN
Analisa EI-238
KETERANGAN
Lump Sump
Analisa LI - 239
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
Sesuai JMF
A. TENAGA
B. MATERIAL
1. Semen Kg 370.8000
2. Pasir Beton M3 0.5250
3. Aggregat Kasar M3 0.7425
5. Formworks Ls 0.2000
6 Paku Kg 1.2000
7 Besi Beton Kg 45.0000
Lihat Gambar 8 Kawat beton Kg 0.0250
sesuai dimensi Sub Total Material
C. PERALATAN
Analisa LI - 239
0
next page
KETERANGAN
continued
Analisa LI - 239
0
next page
KETERANGAN
Analisa LI - 2310
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN PROYEK
No. PAKET KONTRAK
NAMA PAKET
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
Sesuai JMF
A. TENAGA
B. MATERIAL
1. Semen Kg 370.8000
2. Pasir Beton M3 0.5250
3. Aggregat Kasar M3 0.7425
5. Formworks Ls 0.2000
6 Paku Kg 1.2000
7 Besi Beton Kg 45.0000
8 Kawat beton Kg 0.0250
Sub Total Material
Lihat Gambar
sesuai dimensi C. PERALATAN
Analisa LI - 2310
0
next page
KETERANGAN
continued
Analisa LI - 2310
next page
KETERANGAN
FORMULIR STANDAR UNTUK
Analisa LI - 2311 PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
KETERANGAN NAMA PAKET
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
B. MATERIAL
1. Semen Kg 370.8000
2. Pasir Beton M3 0.5250
3. Aggregat Kasar M3 0.7425
5. Formworks Ls 0.2000
6 Paku Kg 1.2000
7 Besi Beton Kg 45.0000
8 Kawat beton Kg 0.0250
Sub Total Material
Analisa LI - 2311
0
next page
KETERANGAN
continued
Analisa LI - 2311
0
next page
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Analisa LI - 2312
PROYEK
No. PAKET KONTRAK
NAMA PAKET
KETERANGAN
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : 2.3.(12)
JENIS PEKERJAAN : Beton K250 (fc’ 20) untuk struktur
SATUAN PEMBAYARAN : M3
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
Sesuai JMF
1. Pekerja (L01) Jam 4.0161
2. Tukang (L02) Jam 0.8032
3. Mandor (L03) Jam 0.1147
B. MATERIAL
1. Semen Kg 370.8000
2. Pasir Beton M3 0.5250
3. Aggregat Kasar M3 0.7425
5. Formworks Ls 0.2000
6 Paku Kg 1.2000
7 Besi Beton Kg 45.0000
C. PERALATAN
Lihat Gambar
sesuai dimensi 1. Beton Mixer (E06) Jam 0.4016
2. Water Tanker (E23) Jam 0.0558
3. Concrete Vibrator (E20) Jam 0.4016
4. Alat Bantu Ls 1.0000
Lihat Gambar
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volum
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan sa
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Ke
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan o
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa LI - 2312
0
next page
KETERANGAN
0
continued
Analisa LI - 2312
0
next page
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Analisa LI - 2313
A. TENAGA
B. BAHAN
Lihat Gambar
1. Baja Tulangan (Polos) U32 (M57a) Kg 1.0500
2. Kawat Beton (M14) Kg 0.0200
C. PERALATAN
Analisa LI - 2314
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
Lihat Gambar
1. Pekerja Biasa (L01) jam 5.2500
2. Tukang (L02) jam 1.7500
3. Mandor (L03) jam 0.8750
B. BAHAN
C. PERALATAN
Analisa EI-241
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.4.(1)
JENIS PEKERJAAN : Bahan Porous untuk Bahan Penyaring (F
SATUAN PEMBAYARAN : M3
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
C. PERALATAN
Lump Sump
Analisa EI-241
KETERANGAN
Analisa LI-242
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
Analisa LI-243
n Drainase Bawah Permukaan
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
1. Pekerja (L01) Jam 1.1667
2. Tukang (L02) Jam 0.5833
3. Mandor (L03) Jam 0.5833
B. BAHAN
C. PERALATAN
DAR UNTUK
-MASING HARGA SATUAN
…………………
……………………………………..
………………………………….
…………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 21,693.45
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 140.78
7,281.29 55.03
172,248.83 1,301.70
131,467.37 17,366.36
0.00 0.00
AN ( A + B + C ) 18,863.87
2,829.58
21,693.45
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
-MASING HARGA SATUAN
…………………
……………………………………..
………………………………….
…………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 345,340.73
% THD. BIAYA PROYEK : 0.02
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 18,704.07
6,088.57 7,335.63
7,281.29 2,924.21
107,100.00 115,668.00
550.93 88,698.93
106,800.00 51,570.97
38,332.25 15,394.48
0.00 0.00
AN ( A + B + C ) 300,296.28
45,044.44
345,340.73
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
-MASING HARGA SATUAN
…………………
……………………………………..
………………………………….
…………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 313,077.66
% THD. BIAYA PROYEK : 0.02
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 10,867.07
6,088.57 5,682.67
7,281.29 3,397.93
851,948.82 89,595.04
8,500.00 98,329.10
79,293.73 9,824.49
25,000.00 20,319.75
AN ( A + B + C ) 272,241.44
40,836.22
313,077.66
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
-MASING HARGA SATUAN
…………………
……………………………………..
………………………………….
…………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 441,334.97
% THD. BIAYA PROYEK : 0.03
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 22,820.84
6,088.57 8,524.00
7,281.29 5,096.90
851,948.82 124,389.23
8,500.00 136,515.16
79,293.73 11,489.66
25,000.00 26,574.75
15,041.78 19,789.37
242,689.55 28,569.63
0.00 0.00
AN ( A + B + C ) 383,769.54
57,565.43
441,334.97
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
-MASING HARGA SATUAN
…………………
……………………………………..
………………………………….
…………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 903,799.32
% THD. BIAYA PROYEK : 0.06
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 65,202.40
6,088.57 10,655.00
7,281.29 12,742.25
851,948.82 246,838.01
8,500.00 270,900.71
79,293.73 24,602.86
25,000.00 47,783.81
15,041.78 35,763.33
242,689.55 71,424.07
0.00 0.00
AN ( A + B + C ) 785,912.45
117,886.87
903,799.32
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
-MASING HARGA SATUAN
…………………
……………………………………..
………………………………….
…………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 1,177,504.42
% THD. BIAYA PROYEK : 0.07
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 65,202.40
6,088.57 10,655.00
7,281.29 12,742.25
851,948.82 347,941.90
8,500.00 381,860.59
79,293.73 32,970.33
25,000.00 57,750.00
15,041.78 43,370.35
242,689.55 71,424.07
0.00 0.00
UMLAH HARGA PERALATAN 114,794.42
AN ( A + B + C ) 1,023,916.89
153,587.53
1,177,504.42
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
-MASING HARGA SATUAN
…………………
……………………………………..
………………………………….
…………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 16,369,404.63
% THD. BIAYA PROYEK : 1.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 300,934.15
6,088.57 32,784.62
7,281.29 39,206.92
12,500.00 13,125,000.00
79,293.73 637,133.05
25,000.00 63,434.60
15,041.78 35,771.54
0.00 0.00
,
AN ( A + B + C ) 14,234,264.89
2,135,139.73
16,369,404.63
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
…………………
……………………………………..
………………………………….
…………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 83,082.52
% THD. BIAYA PROYEK : 0.01
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 8,150.30
6,088.57 0.00
7,281.29 2,548.45
15,041.78 54.59
15,041.78 4,126.11
242,689.55 15,503.13
0.00 0.00
AN ( A + B + C ) 72,245.67
10,836.85
83,082.52
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
…………………
……………………………………..
………………………………….
…………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 91,853.67
% THD. BIAYA PROYEK : 0.01
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 8,150.30
6,088.57 0.00
7,281.29 2,548.45
571,495.37 36,760.93
79,293.73 5,661.57
25,000.00 6,482.25
AN ( A + B + C ) 79,872.76
11,980.91
91,853.67
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
…………………
……………………………………..
………………………………….
…………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 100,682.35
% THD. BIAYA PROYEK : 0.01
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 8,150.30
6,088.57 0.00
7,281.29 2,548.45
571,495.37 42,596.00
79,293.73 6,077.86
25,000.00 7,300.69
15,041.78 81.13
15,041.78 5,292.31
242,689.55 15,503.13
0.00 0.00
UMLAH HARGA PERALATAN 20,876.57
AN ( A + B + C ) 87,549.87
13,132.48
100,682.35
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 18,704.07
6,088.57 4,890.42
7,281.29 835.49
550.93 204,282.99
70,400.00 36,960.00
0.00 0.00
45,000.00 9,000.00
5,500.00 6,600.00
8,400.00 378,000.00
6,000.00 150.00
Sub Total Material 634,992.99
38,332.25 15,394.48
131,467.37 7,341.58
16,259.58 6,529.95
0.00 0.00
Sub Total Peralatan 29,266.01
AN ( A + B + C ) 688,688.98
68,868.90
757,557.88
216,445.00
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 18,704.07
6,088.57 4,890.42
7,281.29 835.49
550.93 204,282.99
70,400.00 36,960.00
0.00 0.00
45,000.00 9,000.00
5,500.00 6,600.00
8,400.00 378,000.00
6,000.00 150.00
Sub Total Material 634,992.99
38,332.25 15,394.48
131,467.37 7,341.58
16,259.58 6,529.95
0.00 0.00
AN ( A + B + C ) 688,688.98
68,868.90
757,557.88
252,519.00
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 18,704.07
6,088.57 4,890.42
7,281.29 835.49
550.93 204,282.99
70,400.00 36,960.00
0.00 0.00
45,000.00 9,000.00
5,500.00 6,600.00
8,400.00 378,000.00
6,000.00 150.00
Sub Total Material 634,992.99
38,332.25 15,394.48
131,467.37 7,341.58
16,259.58 6,529.95
0.00 0.00
AN ( A + B + C ) 688,688.98
68,868.90
757,557.88
303,023.00
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 18,704.07
6,088.57 4,890.42
7,281.29 835.49
550.93 204,282.99
70,400.00 36,960.00
0.00 0.00
45,000.00 9,000.00
5,500.00 6,600.00
8,400.00 378,000.00
AN ( A + B + C ) 688,538.98
68,853.90
757,392.88
DAR UNTUK
-MASING HARGA SATUAN
…………………
……………………………………..
………………………………….
…………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 10,886.66
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 489.02
6,088.57 213.10
7,281.29 254.85
8,400.00 8,820.00
6,000.00 120.00
0.00 0.00
AN ( A + B + C ) 9,896.96
989.70
10,886.66
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
-MASING HARGA SATUAN
…………………
……………………………………..
………………………………….
…………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 205,707.73
% THD. BIAYA PROYEK : 0.01
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 24,450.90
6,088.57 10,655.00
7,281.29 6,371.13
132,300.00 145,530.00
0.00 0.00
UMLAH HARGA PERALATAN 0.00
AN ( A + B + C ) 187,007.03
18,700.70
205,707.73
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-241
DAR UNTUK
-MASING HARGA SATUAN
…………………
……………………………………..
………………………………….
…………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 91,187.79
% THD. BIAYA PROYEK : 0.01
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 13,040.48
7,281.29 5,096.90
0.00 0.00
106,800.00 58,740.00
15,041.78 2,416.35
0.00 0.00
AN ( A + B + C ) 79,293.73
11,894.06
91,187.79
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
-MASING HARGA SATUAN
…………………
……………………………………..
…………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 25,416.90
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 2,608.10
6,088.57 1,704.80
7,281.29 2,038.76
15,000.00 15,750.00
AN ( A + B + C ) 22,101.66
3,315.25
25,416.90
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa LI-243
DAR UNTUK
-MASING HARGA SATUAN
…………………
……………………………………..
…………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 63,613.35
% THD. BIAYA PROYEK : 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 5,433.53
6,088.57 3,551.67
7,281.29 4,247.42
40,000.00 42,000.00
688.66 61.98
0.00 0.00
106,800.00 21.36
0.00 0.00
0.00 0.00
AN ( A + B + C ) 55,315.96
8,297.39
63,613.35
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Berat volume tanah (lepas) D
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Faktor konversi , kedalaman < 40 % Fv
Waktu siklus Ts1
- Menggali , memuat T1
- Lain lain T2
Waktu siklus = T1 x Fv Ts1
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 56,099.57 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Berat volume tanah (lepas) D
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. COMPRESSOR, EXCAVATOR, JACK HAMMER & LOADER
EXCAVATOR (E10)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Faktor konversi , kedalaman < 40 % Fv
Waktu siklus Ts1
- Menggali , memuat T1
- Lain lain T2
Waktu siklus = T1 x Fv Ts1
3. TENAGA
Produksi menentukan : JACK HAMMER Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 88,802.45 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Berat volume tanah (lepas) D
2. ALAT
2.a. COMPRESSOR, EXCAVATOR, JACK HAMMER & LOADER
EXCAVATOR (E10)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Faktor konversi , kedalaman < 40 % Fv
Waktu siklus Ts1
- Menggali , memuat T1
- Lain lain T2
Waktu siklus = T1 x Fv Ts1
3. TENAGA
Produksi menentukan : JACK HAMMER Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
ITEM PEMBAYARAN NO. : 3.1.(2)
JENIS PEKERJAAN : Galian Batu
SATUAN PEMBAYARAN : M3
Rp. 103,849.83 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
7 Pengurugan kembali (backfill) untuk struktur Uk
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 (EI-322)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Faktor konversi (kedalaman < 40 %) Fv
Berat isi material Bim
Waktu siklus
- Menggali, memuat, lain-lain (standar) T1
Waktu siklus = T1 x Fv Ts1
Waktu Siklus Ts
- Waktu gusur = (L x 60) : Vf T1
- Waktu kembali = (L x 60) : Vr T2
- Waktu lain-lain T3
Ts
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 4,507.64 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Pengurugan kembali (backfill) untuk struktur Uk
7 Faktor pembayaran Fp
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 x Fp (EI-322)
- Bahan pengaman tebing galian 0.2 - 0,4 M3 (kayu)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Faktor konversi (kedalaman 40 - 75%) Fv
Berat isi material Bim
Waktu siklus
- Menggali / memuat, lain lain, standar T1
Waktu Siklus Ts
- Waktu gusur = (L x 60) : Vf T1
- Waktu kembali = (L x 60) : Vr T2
- Waktu lain-lain T3
Ts
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Pengurugan kembali (backfill) untuk struktur Uk
7 Faktor pembayaran Fp
II. METHODE PELAKSANAAN
1 Tanah / batu yang dipotong berada disekitar jembatan
2 Penggalian dilakukan dengan mgenggunakan alat
Excavator
3 Bulldozer mengangkut/mengusur hasil galian ke tempat
pembuangan dilokasi sekitar jembatan L
4 Bahan pengaman tebing galian (bahan kayu)
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 x Fp (EI-322)
- Bahan pengaman tebing galian 0.2 - 0,4 M3 (kayu)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi alat Fa
Faktor konversi (kedalaman > 75%) Fv
Berat isi material Bim
Waktu siklus
- Menggali / memuat, lain lain, standar T1
Waktu Siklus
- Waktu gusur = (L x 60) : Vf T1
- Waktu kembali = (L x 60) : Vr T2
- Waktu lain-lain T3
Ts
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 436,915.07 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Berat volume bahan (lepas) D
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. COLD MILLING (E36)
Kapasitas prod/jam = v x b x Fa x t x 60 Q1
3. TENAGA
Produksi menentukan : COLD MILLING Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 85,047.88 / M2
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Tebal perkerasan aspal t
7 Berat volume perkerasan aspal (lepas) D
8 Memakai Motor Grader ( yes = 1 , No = 0 )
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. JACK HAMMER + AIR COMPRESSOR
Kapasitas bongkar bk
Effesiensi kerja Fa
Kapa. Prod/jam = Fa x t x 60 Q1
bk
Koefisien Alat / m3 = 1 : Q1 (E05/260
3. TENAGA
Produksi menentukan : JACK HAMMER Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 420,579.37 / M3
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : . . . . . . . . . . . . bulan
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan (padat ke asli) Fv
6 Tebal hamparan padat t
7 Berat volume bahan (lepas) D
2. ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Faktor Konversi asli ke padat Fv1
Waktu sklus Ts1
- Menggali, memuat T1
- Lain lain T2
Waktu Siklus = T1 x Fv Ts1
Koefisien Alat / M3 = 1 : Q5
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Timbunan / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L02)
Rp. 123,482.99 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan (padat ke asli) Fv
6 Tebal hamparan padat t
7 Berat volume bahan (lepas) D
8 Retribusi bahan timbunan Ret
2. ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Faktor Konversi asli ke padat Fv1
Waktu sklus Ts1
- Menggali, memuat T1
- Lain lain T2
Waktu Siklus = T1 x Fv Ts1
Kapasitas Prod./Jam = pa x Fa x 60 Q5
1000 x Wc
Koefisien Alat / M3 = 1 : Q5
3. TENAGA
Produksi menentukan : EXCAVATOR Q1
Produksi Timbunan / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L02)
Rp. 95,426.52 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Faktor pengembangan bahan (padat ke asli) Fv
7 Tebal hamparan padat t
8 Berat volume bahan (lepas) D
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Waktu sklus Ts1
- Muat T1
Ts1
Koefisienalat / M3 = 1 = 1 : Q1 (E15)
3. TENAGA
Produksi menentukan : DUMP TRUCK Q1
Produksi Timbunan / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Faktor pengembangan bahan (padat ke asli) Fv
7 Tebal hamparan padat t
8 Berat volume bahan (lepas) D
9 Retibusi Ret
II. URUTAN KERJA
1 Whell Loader memuat ke dalam Dump Truck
2 Dump Truck mengangkut ke lapangan dengan jarak
dari galian ke lapangan L
3 Material dihampar dengan menggunakan Motor Grader
4 Hamparan material disiram air dengan Watertank Truck
(sebelum pelaksanaan pemadatan) dan dipadatkan
dengan menggunakan Tandem Roller
5 Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efisiensi Alat Fa
Waktu sklus Ts1
- Muat T1
Ts1
Koefisienalat / M3 = 1 = 1 : Q1 (E15)
3. TENAGA
Produksi menentukan : DUMP TRUCK Q1
Produksi Timbunan / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : di atas tanah rawa
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Berat volume bahan (lepas) D
2. ALAT
Koefisienalat / M3 = 1 : Q1 (E15)
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1
Produksi Timbunan / hari = Tk x Q1 Qt
Asumsi permukaan hamparan di permukaan rawa :
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L02)
Rp. 125,543.80 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : di atas tanah rawa
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Berat volume bahan (lepas) D
2. ALAT
Koefisienalat / M3 = 1 : Q1 (E15)
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L02)
Rp. 125,543.80 / M3
I. ASUMSI
1 Pekerjaan dilaksanakan hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi Jalan : jelek / belum padat
5 Jam kerja efektif per-hari Tk
2. ALAT
2.a. MOTOR GRADER (E13)
Panjang operasi grader sekali jalan Lh
Lebar Efektif kerja Blade b
Lebae overlap bo
Faktor Efisiensi Alat Fa
Kecepatan rata-rata alat v
Jumlah lintasan n
Jumlah lajur lintasan N
Waktu siklus Ts1
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1
- Lain-lain T2
Ts1
Kapasitas Produksi / Jam = Lh x (N(b-bo)+bo) x Fa x 60 Q1
n x Ts1
3. TENAGA
Produksi menentukan : MOTOR GRADER Q1
Produksi Pekerjaan / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M2
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L02)
Rp. 196.45 / M2
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : . . . . . . . . . . . . bulan
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang/baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Faktor pengembangan bahan Fk
7 Tebal hamparan padat t
8 Hasil bongkaran per M2 luas area d
1. BAHAN
1a Bahan timbunan = 1 x Fk (M08)
2. ALAT
2.a DUMP TRUCK (E09)
Kapasitas bak V
Faktor Efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu Siklus :
- Waktu tempuh isi = (L : v1) x 60 menit T1
- Waktu tempuh kosong = (L : v2) x 60 menit T2
- Lain-lain (termasuk dumping setempat-setempat) T3
Ts2
Kap. Prod. / jam = V x Fa x 60 Q2
Ts2 x d
Koefisien Alat / M3 = 1 : Q2 (E09)
TENAGA
Produksi pembersihan dan pembongkaran/hari Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk
5 1 Pohon diameter 15-30 cm setara dengan volume Vp
6 Berat Jenis Kayu BjK
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus Ts2
- Muat T1
- Waktu tempuh isi = (L : v1) x 60 T2
- Waktu tempuh kosong = (L : v2) x 60 T3
- Lain-lain T4
Ts
3. TENAGA
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk
5 1 Pohon diameter 30-50 cm setara dengan volume Vp
6 Berat Jenis Kayu BjK
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus Ts2
- Muat T1
- Waktu tempuh isi = (L : v1) x 60 T2
- Waktu tempuh kosong = (L : v2) x 60 T3
- Lain-lain T4
Ts
3. TENAGA
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk
5 1 Pohon diameter 50 - 75 cm setara dengan volume Vp
6 Berat jenis kayu Bjk
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus Ts2
- Muat T1
- Waktu tempuh isi = (L : v1) x 60 T2
- Waktu tempuh kosong = (L : v2) x 60 T3
- Lain-lain T4
Ts2
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk
5 1 Pohon diameter > 75 cm setara dengan volume Vp
6 Berat jenis kayu Bjk
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus Ts2
- Muat T1
- Waktu tempuh isi = (L : v1) x 60 T2
- Waktu tempuh kosong = (L : v2) x 60 T3
- Lain-lain T4
Ts
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang/rusak
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Tebal perkerasan berbutir t
7 Berat volume perkerasan berbutir D
8 Memakai Drill Breaker ( yes = 1 , No = 0 )
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. JACK HAMMER + AIR COMPRESSOR
Kapasitas bongkar bk
Effesiensi kerja Fa
Kapa. Prod/jam = Fa x t x 60 Q1
bk
Koefisien Alat / m3 = 1 : Q1 (E05/260
3. TENAGA
Produksi menentukan : JACK HAMMER Q1
Produksi Galian / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 71,977.74 / M3
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : . . . . . . . . . . . . bulan
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang/rusak
4 Jam kerja efektif per-hari Tk
5 Faktor pengembangan bahan Fk
6 Tebal perkerasan beton t
7 Berat volume perkerasan beton D
8 Memakai Drill Breaker ( yes = 1 , No = 0 )
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. JACK HAMMER + AIR COMPRESSOR
Kapasitas bongkar bk
Effesiensi kerja Fa
Kapa. Prod/jam = Fa x t x 60 Q1
bk
Koefisien Alat / m3 = 1 : Q1 (E05/260
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 85,392.52 / M3
NO URAIAN KODE
I ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sebagian jalan
3 Bahan Geitekstile dibawa memakai Truck dari
base camp ke lokasi pekrjaan
4 jarak Rata-rata dari base camp ke lokasi pekerjaan L
5 Jam kerja efektif per hari Tk
6 Faktor kehilangan bahan Fh
7 Semua bahan dan cara pemasangan mengikuti
rencana gambar dan persyaratan teknis yang
harus dipenuhi
II URUTAN KERJA
1 Saluran lokasi pemasangan geotekstile digali
sampai permukaan galiannya rata
2 Geotekstile dihamparkan secara lepas tanpa kerutan
atau lipatan, dan tidak ada rongga antara geotekstile
dan permukaan tanah
3 Agregat drainase segera dihamparkan di atas
hamparan geotekstile, kemudian dipadatkan dengan
menggunakan pemadat getar
4 Pembayaran untuk persiapan lereng, penggalian, dan
pengurugan, lapisan dasar (bedding) jika ada dan bahan
penutup merupakan mata pembayaran terpisah
2 ALAT
2.a Flat Bed Truck E11
Kapasitas satu kali angkut Cp
waktu angkut/siklus=T1+T2+T3+T4 Ts
Waktu muat T1
Waktu angkut
Berangkat isi = L/20 x 60 T2
Kembali kosong = L/30 x 60 T3
lain-lain, bongkar T4
Ts
Kapasitas produksi/jam = Cp x 60 Q1
Ts
Koefisien alat/M³ E11
3 TENAGA
Produksi menghampar geotekstile per hari = Tk x Q1 Qt
mandor (M) M
pekerja (P) P
Koefisien tenaga/M²
mandor (M) = (TK x M) : Qt L03
pekerja (P) = (Tk x P) : Qt L01
NO URAIAN KODE
I ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sebagian jalan
3 Bahan Geitekstile dibawa memakai Truck dari
base camp ke lokasi pekrjaan
4 jarak Rata-rata dari base camp ke lokasi pekerjaan L
5 Jam kerja efektif per hari Tk
6 Faktor kehilangan bahan Fh
7 Semua bahan dan cara pemasangan mengikuti
rencana gambar dan persyaratan teknis yang
harus dipenuhi
II URUTAN KERJA
1 Lokasi pemasangan geotekstile diratakan
2 Geotekstile digelar secara lepas tanpa kerutan atau
lipatan di atas tanah dasar yang sudah disisipkan
3 Penumpukan lapis pondasi bawah di atas gotekstile
dengan cara penumpukan ujung
2 ALAT
2.a Flat Bed Truck E11
Kapasitas satu kali angkut Cp
waktu angkut/siklus=T1+T2+T3+T4 Ts
Waktu muat T1
Waktu angkut
Berangkat isi = L/20 x 60 T2
Kembali kosong = L/30 x 60 T3
lain-lain, bongkar T4
Ts
Kapasitas produksi/jam = Cp x 60 Q1
Ts
Koefisien alat/M³ E11
3 TENAGA
Produksi menghampar geotekstile per hari = Tk x Q1 Qt
mandor (M) M
pekerja (P) P
Koefisien tenaga/M²
mandor (M) = (TK x M) : Qt L03
pekerja (P) = (Tk x P) : Qt L01
NO URAIAN KODE
I ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sebagian jalan
3 Bahan Geitekstile dibawa memakai Truck dari
base camp ke lokasi pekrjaan
4 jarak Rata-rata dari base camp ke lokasi pekerjaan L
5 Jam kerja efektif per hari Tk
6 Faktor kehilangan bahan Fh
7 Semua bahan dan cara pemasangan mengikuti
rencana gambar dan persyaratan teknis yang
harus dipenuhi
II URUTAN KERJA
1 Lokasi pemasangan geotekstile diratakan
2 Geotekstile digelar secara lepas tanpa kerutan atau
lipatan di atas tanah dasar yang sudah disisipkan
3 Penumpukan lapis pondasi bawah di atas gotekstile
dengan cara penumpukan ujung
2 ALAT
2.a Flat Bed Truck E11
Kapasitas satu kali angkut Cp
waktu angkut/siklus=T1+T2+T3+T4 Ts
Waktu muat T1
Waktu angkut
Berangkat isi = L/20 x 60 T2
Kembali kosong = L/30 x 60 T3
lain-lain, bongkar T4
Ts
Kapasitas produksi/jam = Cp x 60 Q1
Ts
Koefisien alat/M³ E11
3 TENAGA
Produksi menghampar geotekstile per hari = Tk x Q1 Qt
mandor (M) M
pekerja (P) P
Koefisien tenaga/M²
mandor (M) = (TK x M) : Qt L03
pekerja (P) = (Tk x P) : Qt L01
NO URAIAN KODE
I ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sebagian jalan
3 Bahan Geitekstile dibawa memakai Truck dari
base camp ke lokasi pekrjaan
4 jarak Rata-rata dari base camp ke lokasi pekerjaan L
5 Jam kerja efektif per hari Tk
6 Faktor kehilangan bahan Fh
7 Semua bahan dan cara pemasangan mengikuti
rencana gambar dan persyaratan teknis yang
harus dipenuhi
II URUTAN KERJA
1 Lokasi pemasangan geotekstile diratakan
2 Geotekstile digelar secara lepas tanpa kerutan atau
lipatan di atas tanah dasar yang sudah disisipkan
3 Penumpukan lapis pondasi bawah di atas gotekstile
dengan cara penumpukan ujung
2 ALAT
2.a Flat Bed Truck E11
Kapasitas satu kali angkut Cp
waktu angkut/siklus=T1+T2+T3+T4 Ts
Waktu muat T1
Waktu angkut
Berangkat isi = L/20 x 60 T2
Kembali kosong = L/30 x 60 T3
lain-lain, bongkar T4
Ts
Kapasitas produksi/jam = Cp x 60 Q1
Ts
Koefisien alat/M³ E11
3 TENAGA
Produksi menghampar geotekstile per hari = Tk x Q1 Qt
mandor (M) M
pekerja (P) P
Koefisien tenaga/M²
mandor (M) = (TK x M) : Qt L03
pekerja (P) = (Tk x P) : Qt L01
NO URAIAN KODE
I ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sebagian jalan
3 Bahan Geitekstile dibawa memakai Truck dari
base camp ke lokasi pekrjaan
4 jarak Rata-rata dari base camp ke lokasi pekerjaan L
5 Jam kerja efektif per hari Tk
6 Faktor kehilangan bahan Fh
7 Semua bahan dan cara pemasangan mengikuti
rencana gambar dan persyaratan teknis yang
harus dipenuhi
II URUTAN KERJA
1 Lokasi pemasangan geotekstile diratakan
2 Geotekstile digelar secara lepas tanpa kerutan atau
lipatan di atas tanah dasar yang sudah disisipkan
3 Penumpukan lapis pondasi bawah di atas gotekstile
dengan cara penumpukan ujung
2 ALAT
2.a Flat Bed Truck E11
Kapasitas satu kali angkut Cp
waktu angkut/siklus=T1+T2+T3+T4 Ts
Waktu muat T1
Waktu angkut
Berangkat isi = L/20 x 60 T2
Kembali kosong = L/30 x 60 T3
lain-lain, bongkar T4
Ts
Kapasitas produksi/jam = Cp x 60 Q1
Ts
Koefisien alat/M³ E11
2.b Alat Bantu
Pacul, sekop, kereta dorong, dll Ls
3 TENAGA
Produksi menghampar geotekstile per hari = Tk x Q1 Qt
mandor (M) M
pekerja (P) P
Koefisien tenaga/M²
mandor (M) = (TK x M) : Qt L03
pekerja (P) = (Tk x P) : Qt L01
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(1a)
1.20 - JENIS PEKERJAAN : Galian Biasa
1.60 ton/m3 1.40 - 1.80 SATUAN PEMBAYARAN : M3
NO. KOMPONEN
5.00 Km A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
0.93 M3
1.00 -
0.83
0.90 Faktor konversi
menit dihapus, masuk
1.320 menit dalam waktu siklus
0.100 menit disesuaikam
1.42 menit
39.14 M3/Jam
C. PERALATAN
Analisa EI-311a
39.14 M3/Jam
273.97 M3
2.00 orang
1.00 orang
0.0511 Jam
0.0256 Jam
Analisa EI-311b
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(1b)
1.20 - JENIS PEKERJAAN : Galian batu lunak
1.80 ton/m3 SATUAN PEMBAYARAN : M3
NO. KOMPONEN
5.00 Km A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
(E05/26/10/15) B. BAHAN
0.93 M3
1.00 -
0.83
0.90 Faktor konversi
menit dihapus, masuk
3.000 menit dalam waktu siklus
0.100 menit disesuaikam
3.10 menit
17.93 M3/Jam
0.0558 Jam
3.50 M3
0.83 -
20.00 KM/Jam
30.00 KM/Jam
menit
6.51 menit
15.00 menit
10.00 menit
2.00 menit C. PERALATAN
33.51 menit 1. Compressor (E05)
2. Jack Hammer (E26)
2.89 M3 / Jam 3. Wheel Loader (E15)
4. Excavator (E10)
5 Dump Truck (E08)
0.3460 Jam Alat bantu
Lump Sump
Analisa EI-311b
NO. KOMPONEN
5.00 Km A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
(E05/26/10/15) B. BAHAN
0.93 M3
1.00 -
0.83
0.90
menit
4.000 menit
0.100 menit
4.10 menit
C. PERALATAN
13.56 M3/Jam 1. Compressor (E05)
2. Jack Hammer (E26)
3. Wheel Loader (E15)
0.0738 Jam 4. Excavator (E10)
5 Dump Truck (E08)
Alat bantu
3.50 M3
0.83 -
20.00 KM/Jam
30.00 KM/Jam
menit D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
8.61 menit E. OVERHEAD & PROFIT
15.00 menit F. HARGA SATUAN PEKERJAAN ( D + E )
10.00 menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk
2.00 menit berat untuk bahan-bahan.
35.61 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
dari nomor mata pembayaran. Harga Satuan yang d
2.72 M3 / Jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk baha
4 Biaya satuan sudah termasuk pengeluaran untuk se
0.3677 Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
Lump Sump
13.56 M3/Jam
94.89 M3
8.00 orang
1.00 orang
0.5902 Jam
0.0738 Jam
Berlanjut ke halaman berikut
Analisa EI-312
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(3)
1.20 - JENIS PEKERJAAN : Galian Struktur dengan keda
50.00 %/M3 SATUAN PEMBAYARAN : M3
NO. KOMPONEN
0.1000 Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
0.50 M3
M3 cek item 3.1(6) JUMLAH HARGA T
B. BAHAN
0.93 M3
1.00 - 1. Urugan Pilihan (EI-322)
0.83 -
0.90 -
0.85 -
0.32 menit
0.29 menit JUMLAH HARGA
1.00 -
0.83 -
3.00 Km/Jam
5.00 Km/Jam
5.40 M3 JUMLAH HARGA PERA
1.00
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
2.0 menit F. HARGA SATUAN PEKERJAAN ( D + E )
1.2 menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk
0.05 menit berat untuk bahan-bahan.
3.25 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
dari nomor mata pembayaran. Harga Satuan yang d
68.95 M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk baha
4 Biaya satuan sudah termasuk pengeluaran untuk se
0.014502 Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
Lump Sump
Analisa EI-313
192.98 M3/Jam
1,350.83 M3
4.00 orang
1.00 orang
0.0207 Jam
0.0052 Jam
Analisa EI-314
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(4)
1.20 - JENIS PEKERJAAN : Galian Struktur dengan keda
50.00 %/M3 SATUAN PEMBAYARAN : M3
2.00 1.5 - 2
NO. KOMPONEN
0.1000 Km A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
1.00 M3
0.30 M3 cek item 3.1(6) JUMLAH HARGA T
B. BAHAN
0.93 M3
1.00 - 1. Urugan Pilihan (EI-322)
0.83 - 2 Bahan pengaman tebing galian
1.00 -
0.85 -
0.32 menit
JUMLAH HARGA
0.32 menit
C. PERALATAN
173.68 M3/Jam 1. Excavator (E10)
2. Bulldozer (E04)
3. Alat bantu
0.0058 Jam
1.00 -
0.83 -
3.00 Km/Jam
5.00 Km/Jam JUMLAH HARGA PERA
5.40 M3 panduan =datar
1.00 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
2.0 menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk
1.2 menit berat untuk bahan-bahan.
0.05 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
3.25 menit dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
68.95 M3 3 Biaya satuan untuk peralatan sudah termasuk baha
4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.0145 Jam
Analisa EI-314
Lump Sump
173.68 M3/Jam
1,215.74 M3
10.00 orang
1.00 orang
0.0576 Jam
0.0058 Jam
Analisa EI-315
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(5)
1.20 - JENIS PEKERJAAN : Galian Struktur dengan keda
30.00 %/M3 SATUAN PEMBAYARAN : M3
2.00 1.5 - 2
NO. KOMPONEN
0.1000 Km A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
0.60 M3
0.30 M3 cek item 3.1(6) JUMLAH HARGA T
B. BAHAN
0.93 M3
1.00 - 1. Urugan Pilihan (EI-322)
0.83 - 2 Bahan pengaman tebing galian
1.50 -
0.85 -
0.32 menit
JUMLAH HARGA
0.48 menit
C. PERALATAN
115.79 M3/Jam 1. Excavator (E10)
2. Bulldozer (E04)
3. Alat bantu
0.0086 Jam
1.00 -
0.83 -
3.00 Km/Jam
5.00 Km/Jam JUMLAH HARGA PERA
5.40 M3
1.00 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
2.0 menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk
1.2 menit berat untuk bahan-bahan.
0.05 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
3.25 menit dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
68.95 M3 3 Biaya satuan untuk peralatan sudah termasuk baha
4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.014502 Jam
Lump Sump
115.79 M3/Jam
810.50 M3
12.00 orang
1.00 orang
0.1036 Jam
0.0086 Jam
Analisa EI-316
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(6)
1.24 - JENIS PEKERJAAN : Galian Perkerasan Beraspa
2.20 Ton/M3 SATUAN PEMBAYARAN : M3
NO. KOMPONEN
5.00 Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1 m
0.15 m
5.00 m/menit
0.60 grafik cold
miling
27.00 M3
0.0370 Jam
C. PERALATAN
3.50 Ton 1. Cold Milling (E36)
0.83 - 2 Dump Truck (E08)
20.00 KM/Jam 3. Alat bantu
30.00 KM/Jam
menit
2.85 menit
15.00 menit
10.00 menit
2.00 menit D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
29.85 menit E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
2.14 M3 / Jam Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap k
0.4672 Jam dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk baha
Lump Sump 4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
27.00 M3/Jam
189.00 M2
2.00 orang
1.00 orang
Analisa EI-316
0.0741 Jam
0.0370 Jam
Analisa EI-317
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.1.(7)
1.30 - JENIS PEKERJAAN : Galian Perkerasan Beraspa
0.05 M SATUAN PEMBAYARAN : M3
2.20 Ton/M3
0
NO. KOMPONEN
A. TENAGA
3.00 Km
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
6.00 m3/jam
0.83
0.415 M3
2.4096 Jam
3.50 M3
0.83 - C. PERALATAN
20.00 KM/Jam 1. Jack Hammer E26
30.00 KM/Jam 2. Compresor E05
3. Dump Truck E08
176.93 menit 4 Motor Greder E15
9.00 menit
6.00 menit
2.00 menit
193.93 menit
5.00 menit
1.0 menit
6.00 menit
16.00 M3
0.0000 Jam
Analisa EI-317
6.00 M3/Jam
42.00 M3
2.00 orang
1.00 orang
0.3333 Jam
0.1667 Jam
Analisa EI-321
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.2.(1a)
1.11 - JENIS PEKERJAAN : Timbunan Biasa Dari Sumbe
0.15 M SATUAN PEMBAYARAN : M3
1.60 Ton/M3
NO. KOMPONEN
10.00 Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L02)
1.11 M3
B. BAHAN
0.32 menit
0.10 menit
0.42 menit
C. PERALATAN
99.24 M3 kondisi padat 1. Excavator (E15)
2. Dump Truck (E08)
3. Motor Grader (E13)
0.0101 Jam 4 Vibro Roller (E19)
5. Water tank truck (E23)
6 Alat Bantu
3.50 Ton
0.83 -
1.25
20.00 KM/Jam
30.00 KM/Jam D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
1.19 menit F. HARGA SATUAN PEKERJAAN ( D + E )
30.00 menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk
20.00 menit berat untuk bahan-bahan.
2.00 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
53.19 menit dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
1.64 M3 3 Biaya satuan untuk peralatan sudah termasuk baha
4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.6103 Jam
Berlanjut ke halaman berikut
Analisa EI-321
50.00 M
0.30 M
0.80 -
4.00 Km / Jam
2 lintasan
1.00
2.6 M
0.75 menit
1.00 menit
1.75 menit
267.43 M3
0.0037 Jam
4.00 Km / Jam
1.48 M
8.00 lintasan
3.00
0.30 M
0.83 -
239.04 M3
0.0042 Jam
5.00 M3
0.07 M3
200.00 liter/menit
0.83
142.29 M3
0.0070 jam
Lump Sump
99.24 M3/Jam
694.71 M3
4.00 orang
1.00 orang
0.0403 Jam
0.0101 Jam
PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
…………………………………
PROP / KAB / KODYA : …………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 3.2.(1b)
1.11 - JENIS PEKERJAAN : Timbunan Biasa Dari Galian
0.15 M SATUAN PEMBAYARAN : M3
1.60 Ton/M3
5,000.00 Rp
NO. KOMPONEN
8.70 Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L02)
0.93 M3
1.00 -
0.83 -
0.90
1.00 menit
0.10 menit
1.10 menit C. PERALATAN
1. Excavator (E15)
37.89 M3 kondisi padat 2. Dump Truck (E08)
3. Motor Grader (E13)
4 Vibro Roller (E19)
0.0264 Jam 5. Water tank truck (E23)
6 Alat Bantu
3.50 Ton
0.83 -
1.25
20.00 KM/Jam D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
30.00 KM/Jam E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
3.12 menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk
26.10 menit berat untuk bahan-bahan.
17.40 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
2.00 menit dari nomor mata pembayaran. Harga Satuan yang d
48.62 menit terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk baha
1.79 M3 4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.5579 Jam
Analisa EI-321
50.00 M
0.30 M
0.80 -
4.00 Km / Jam
2 lintasan
1.00
2.6 M
0.75 menit
1.00 menit
1.75 menit
267.43 M3
0.0037 Jam
4.00 Km / Jam
1.48 M
8.00 lintasan
3.00
0.30 M
0.83 -
239.04 M3
0.0042 Jam
5.00 M3
0.07 M3
200.00 liter/menit
0.83
142.29 M3
0.0070 jam
Lump Sump
37.89 M3/Jam
265.25 M3
4.00 orang
1.00 orang
0.1056 Jam
0.0264 Jam
Berlanjut ke halaman berikut
Analisa EI-321
10.00 Km A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1.50 M3
0.85 -
0.83 -
C. PERALATAN
0.45 menit 1. Wheel Loader (E15)
0.45 menit 2. Dump Truck (E08)
3. Motor Grader (E13)
117.58 M3 3. Tandem (E17)
4. Water Tanker (E23)
5. Alat Bantu
0.0085 Jam
3.50 M3
0.83 -
1.25 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
20.00 Km / Jam E. OVERHEAD & PROFIT
30.00 Km / Jam F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk
0.93 menit berat untuk bahan-bahan.
30.00 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
20.00 menit dari nomor mata pembayaran. Harga Satuan yang d
2.00 menit terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
52.93 menit 3 Biaya satuan untuk peralatan sudah termasuk baha
4 Biaya satuan sudah termasuk pengeluaran untuk se
1.65 M3 yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.6073 Jam
Analisa EI-322
0.75 menit
1.00 menit
1.75 menit
252.00 M3
0.0040 Jam
1.50 Km / jam
1.48 M
8.00 lintasan
2.00
0.30 m
0.83 -
62.09 M3
0.0161 Jam
4.00 M3
0.07 M3
200.00 liter/menit
0.83 -
142.29 M3
0.0070 Jam
Lump Sump
1.65 M3/Jam
11.53 M3
4.00 orang
1.00 orang
2.4294 Jam
0.6073 Jam
Analisa EI-322
B. BAHAN
1. Retribusi
1.50 M3
0.85 -
0.83 - C. PERALATAN
1. Wheel Loader (E15)
0.45 menit 2. Dump Truck (E08)
0.45 menit 3. Motor Grader (E13)
3. Tandem (E17)
117.58 M3 4. Water Tanker (E23)
5. Alat Bantu
0.0085 Jam
3.50 M3
0.83 - D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
1.25 E. OVERHEAD & PROFIT
20.00 Km / Jam F. HARGA SATUAN PEKERJAAN ( D + E )
30.00 Km / Jam Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk
berat untuk bahan-bahan.
0.93 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
26.10 menit dari nomor mata pembayaran. Harga Satuan yang d
17.40 menit terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
2.00 menit 3 Biaya satuan untuk peralatan sudah termasuk baha
46.43 menit 4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
1.88 M3
0.5328 Jam
Berlanjut ke halaman berikut
Analisa EI-322
50.00 m
2.60 m
0.30 m Panduan
0.80 -
4.00 Km / Jam
4.00 lintasan
2.00
0.75 menit
1.00 menit
1.75 menit
252.00 M3
0.0040 Jam
1.50 Km / jam
1.48 M
8.00 lintasan
2.00
0.30 m
0.83 -
62.09 M3
0.0161 Jam
4.00 M3
0.07 M3
200.00 liter/menit
0.83 -
142.29 M3
0.0070 Jam
Lump Sump
1.88 M3/Jam
13.14 M3
4.00 orang
1.00 orang
2.1310 Jam
0.5328 Jam
Analisa EI-322
NO. KOMPONEN
10.00 Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L02)
B. BAHAN
1.00 M3
1. Bahan pilihan (M09) (M09)
3.50 Ton
0.83 -
20.00 KM/Jam
30.00 KM/Jam
1.60 M3/Jam
0.6252 Jam
141.10 M3
0.0071 Jam
Analisa EI-323
141.10 M3/Jam
987.70 M3
2.00 orang
1.00 orang
0.0142 Jam
0.0071 Jam
Analisa EI-323 FORMULIR STAN
PEREKAMAN ANALISA MASING
URAIAN ANALISA HARGA SATUAN
NO. KOMPONEN
10.00 Km A. TENAGA
1. Pekerja (L01)
2. Mandor (L02)
B. BAHAN
3.50 Ton
0.83 -
20.00 KM/Jam C. PERALATAN
30.00 KM/Jam 1. Dump Truck (E08)
2. Whell Loader (E15)
0.73 menit 3. Alat Bantu
30.00 menit
20.00 menit
3.00 menit
53.73 menit
1.60 M3/Jam
141.10 M3
0.0071 Jam
Analisa EI-323
2.00 orang
1.00 orang
0.0142 Jam
0.0071 Jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
#REF!
A. TENAGA
1. Pekerja (L01)
2. Mandor (L02)
B. BAHAN
50.00 M
2.60 M
0.30
0.80 -
4.00 Km / Jam
4.00 lintasan
2.00 lajur
C. PERALATAN
0.75 menit 1. Motor Grader (E13)
1.00 menit 2. Vibro Roller (E19)
1.75 menit 3 Alat Bantu
1,680.00 M2
0.0006 Jam
4.00 Km / jam
1.48 M D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
6.00 lintasan E. OVERHEAD & PROFIT
3.00 F. HARGA SATUAN PEKERJAAN ( D + E )
0.30 M Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk
0.83 - berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap k
2,124.80 M2 dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk baha
0.0005 Jam 4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Lump Sum
1,680.00 M2/Jam
11,760.00 M2
4.00 orang
1.00 orang
0.0024 Jam
0.0006 Jam
#REF!
Analisa EI-341
URAIAN ANALISA HARGA SATUAN PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
KOEF. SATUAN KETERANGAN PROP / KAB / KODYA : …………………………………
MATA PEMBAYARAN NO. : 3.4.(1)
JENIS PEKERJAAN : Pembersihan dan Pengupas
SATUAN PEMBAYARAN : M2
1. Pekerja (L01)
2. Mandor (L03)
2.00 km B. BAHAN
5.00 orang
1.00 orang
0.0700 jam
0.0140 jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
Analisa EI-342
PROYEK :
URAIAN ANALISA HARGA SATUAN No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
PROP / KAB / KODYA : …………………………………
KOEF. SATUAN KETERANGAN ITEM PEMBAYARAN NO. : 3.4.(2)
JENIS PEKERJAAN : Pemotongan Pohon Pilihan
SATUAN PEMBAYARAN : buah
NO. KOMPONEN
7.00 Jam
2.00 M3
0.90 ton/M3
A. TENAGA
2.00 Km
B. BAHAN
10.0 TON C. PERALATAN
0.83
20.00 Km/Jam 1. Dump Truck E09
30.00 Km/Jam 2. Chainsaw
menit 3. Alat Bantu
35.00 menit
6.00 menit
4.00 menit
10.00 menit
55.00
5.03 Buah/Jam
0.1988 jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
7 buah Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap k
1.0000 Buah / Jam dari nomor mata pembayaran. Harga Satuan yang d
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
1.00 jam 3 Biaya satuan untuk peralatan sudah termasuk baha
4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Lump Sum
20.00 buah
10.00 orang
1.00 orang
3.50 jam
0.35 jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
Analisa EI-343
PROYEK :
URAIAN ANALISA HARGA SATUAN No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
PROP / KAB / KODYA : …………………………………
KOEF. SATUAN KETERANGAN ITEM PEMBAYARAN NO. : 3.4.(3)
JENIS PEKERJAAN : Pemotongan Pohon Pilihan
SATUAN PEMBAYARAN : buah
NO. KOMPONEN
7.00 Jam
3.00 M3
0.90 ton/M3
A. TENAGA
2.00 Km
B. BAHAN
20.00 buah
10.00 orang
1.00 orang
3.50 jam
0.35 jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
Analisa EI-344
PROYEK :
URAIAN ANALISA HARGA SATUAN No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
PROP / KAB / KODYA : …………………………………
KOEF. SATUAN KETERANGAN ITEM PEMBAYARAN NO. : 3.4.(4)
JENIS PEKERJAAN : Pemotongan Pohon Pilihan
SATUAN PEMBAYARAN : buah
NO. KOMPONEN
7.00 Jam
5.00 M3
0.90 ton/m3
A. TENAGA
2.00 Km
B. BAHAN
20.00 M2
10.00 orang
1.00 orang
3.5000 jam
0.3500 jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
Analisa EI-345
A. TENAGA
2.00 Km
B. BAHAN
10.0 ton
0.83 C. PERALATAN
20.00 Km/Jam
30.00 Km/Jam 1. Dump Truck E09
menit 2. Chainsaw
35.00 menit 3. Alat Bantu
6.00 menit
4.00 menit
15.00 menit
60.00 menit
0.92 Buah
10.00 orang
1.00 orang
4.6667 jam
0.4667 jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
Analisa EI-318
7.00 Jam
1.20 - NO. KOMPONEN
0.30 M
1.81 Ton/M3
0
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
3.00 Km
B. BAHAN
4.00 menit/m2
0.83
3.735 M3
C. PERALATAN
0.2677 Jam 1. Jack Hammer E26
2. Compresor E05
3. Dump Truck E08
3.50 M3
0.83 -
30.00 KM/Jam
40.00 KM/Jam
25.89 menit
6.00 menit D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
4.50 menit E. OVERHEAD & PROFIT
3.00 menit F. HARGA SATUAN PEKERJAAN ( D + E )
39.39 menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk
berat untuk bahan-bahan.
4.43 M3 / Jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
dari nomor mata pembayaran. Harga Satuan yang d
0.2260 Jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk baha
4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
4.00 M3/Jam
28.00 M3
6.00 orang
1.00 orang
1.5000 Jam
0.2500 Jam
Analisa EI-318
Analisa EI-319
URAIAN ANALISA HARGA SATUAN PROYEK :
No. PAKET KONTRAK : …………………………………
NAMA PAKET : …………………………………
KOEF. SATUAN KETERANGAN …………………………………
PROP / KAB / KODYA : …………………………………
ITEM PEMBAYARAN NO. : 3.1.(9).
JENIS PEKERJAAN : Galian Perkerasan Beton
SATUAN PEMBAYARAN : M3
7.00 Jam
1.20 - NO. KOMPONEN
0.30 M
2.40 Ton/M3
0
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
3.00 Km
B. BAHAN
6.00 menit/m2
0.83
2.490 M3
C. PERALATAN
0.4016 Jam 1. Jack Hammer E26
2. Compresor E05
3. Dump Truck E08
3.50 M3
0.83 -
30.00 KM/Jam
40.00 KM/Jam
29.28 menit
6.00 menit D. JUMLAH HARGA TENAGA, BAHAN DAN PERALAT
4.50 menit E. OVERHEAD & PROFIT
3.00 menit F. HARGA SATUAN PEKERJAAN ( D + E )
42.78 menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk
berat untuk bahan-bahan.
4.07 M3 / Jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap k
dari nomor mata pembayaran. Harga Satuan yang d
0.2455 Jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) se
3 Biaya satuan untuk peralatan sudah termasuk baha
4 Biaya satuan sudah termasuk pengeluaran untuk se
yang dibayar dari kontrak) dan biaya-biaya lainnya.
6.00 M3/Jam
42.00 M3
6.00 orang
1.00 orang
1.0000 Jam
0.1667 Jam
Analisa EI-319
A. TENAGA
1 Mandor (L03)
2 Pekerja (L01)
3
8.7 Km
7.0 jam
1.05
B. BAHAN
1 Geotekstile filler GF
C. PERALATAN
1 Flat Bed Truck
Alat Bantu
26.18 menit
17.45 menit
10.00 menit
63.63 menit
56.58 M²
0.0177 jam
0.00
396.07 M²
1.00 orang
8.00 orang
0.0177 jam
0.1414 jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
KEGIATAN :
Analisa EI-352a PEKERJAAN :
KABUPATEN :
URAIAN ANALISA HARGA SATUAN PROPINSI :
ITEM PEMBAYARAN : 3.5.(2a)
JENIS PEKERJAAN : Geotekstile Separator Kelas
SATUAN PEMBAYARAN : M2
A. TENAGA
1 Mandor (L03)
2 Pekerja (L01)
3
8.7 Km
7.0 jam
1.05
B. BAHAN
1 Geotekstile separator GSp
kelas 1
C. PERALATAN
1 Flat Bed Truck
Alat Bantu
1.00 M2
0.0177 jam
0.00
396.07 M²
1.00 orang
8.00 orang
0.0177 jam
0.1414 jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
KEGIATAN :
Analisa EI-352b PEKERJAAN :
KABUPATEN :
URAIAN ANALISA HARGA SATUAN PROPINSI :
ITEM PEMBAYARAN : 3.5.(2b)
JENIS PEKERJAAN : Geotekstile Separator Kelas
SATUAN PEMBAYARAN : M2
A. TENAGA
1 Mandor (L03)
2 Pekerja (L01)
3
8.7 Km
7.0 jam
1.05
B. BAHAN
1 Geotekstile separator GSp
kelas 2
C. PERALATAN
1 Flat Bed Truck
Alat Bantu
1.00 M2
0.0177 jam
0.00
396.07 M²
1.00 orang
8.00 orang
0.0177 jam
0.1414 jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
KEGIATAN :
Analisa EI-352c PEKERJAAN :
KABUPATEN :
URAIAN ANALISA HARGA SATUAN PROPINSI :
ITEM PEMBAYARAN : 3.5.(2c)
JENIS PEKERJAAN : Geotekstile Separator Kelas
SATUAN PEMBAYARAN : M2
A. TENAGA
1 Mandor (L03)
2 Pekerja (L01)
3
8.7 Km
7.0 jam
1.05
B. BAHAN
1 Geotekstile separator GSp
kelas 3
C. PERALATAN
1 Flat Bed Truck
Alat Bantu
1.00 M2
0.0177 jam
0.00
396.07 M²
1.00 orang
8.00 orang
0.0177 jam
0.1414 jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
KEGIATAN :
Analisa EI-353 PEKERJAAN :
KABUPATEN :
URAIAN ANALISA HARGA SATUAN PROPINSI :
ITEM PEMBAYARAN : 3.5.(3)
JENIS PEKERJAAN : Geotekstile Stabilisator (Kel
SATUAN PEMBAYARAN : M2
A. TENAGA
1 Mandor (L03)
2 Pekerja (L01)
3
8.7 Km
7.0 jam
1.05
B. BAHAN
1 Geotekstile stabilisator GSp
kelas 1
C. PERALATAN
1 Flat Bed Truck
Alat Bantu
1.00 M2
0.0177 jam
0.00
396.07 M²
1.00 orang
8.00 orang
0.0177 jam
0.1414 jam
Analisa EI-311a
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Biasa TOTAL HARGA (Rp.) : 56,099.57
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian batu lunak TOTAL HARGA (Rp.) : 88,802.45
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Batu TOTAL HARGA (Rp.) : 103,849.83
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Struktur dengan kedalaman 0 - TOTAL HARGA (Rp.) : 4,507.64
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Struktur dengan kedalaman 2 - TOTAL HARGA (Rp.) : 436,074.45
% THD. BIAYA PROYEK : 0.03
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Struktur dengan kedalaman 4 - TOTAL HARGA (Rp.) : 436,915.07
% THD. BIAYA PROYEK : 0.03
PERKIRAAN HARGA JUMLAH
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Perkerasan Beraspal dengan ColTOTAL HARGA (Rp.) : 85,047.88
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Perkerasan Beraspal tanpa ColdTOTAL HARGA (Rp.) : 420,579.37
% THD. BIAYA PROYEK : 0.03
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Timbunan Biasa Dari Sumber Galian TOTAL HARGA (Rp.) : 123,482.99
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Timbunan Biasa Dari Galian TOTAL HARGA (Rp.) : 123,482.99
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Timbunan Pilihan Dari Sumber Gaian TOTAL HARGA (Rp.) : 148,278.88
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Timbunan Pilihan dari galian TOTAL HARGA (Rp.) : 148,278.88
% THD. BIAYA PROYEK : 0.01
Rp 1.0000 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Timbunan Pilihan (diukur diatas bak tru TOTAL HARGA (Rp.) : 125,543.80
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Timbunan Pilihan (diukur dengan rod daTOTAL HARGA (Rp.) : 125,543.80
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Penyiapan Badan Jalan TOTAL HARGA (Rp.) : 196.45
0 % THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Pemotongan Pohon Pilihan diameter 15TOTAL HARGA (Rp.) : 77,273.75
% THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
: ………………………………………………
: …………………………………………………………………..
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Pemotongan Pohon Pilihan diameter 30TOTAL HARGA (Rp.) : 104,899.92
% THD. BIAYA PROYEK : 0.01
(Rp.) (Rp.)
: ………………………………………………
: …………………………………………………………………..
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Pemotongan Pohon Pilihan diameter 50TOTAL HARGA (Rp.) : 160,382.25
% THD. BIAYA PROYEK : 0.01
PERKIRAAN HARGA JUMLAH
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
: ………………………………………………
: …………………………………………………………………..
: ………………………………………………
PERKIRAAN VOL. PEK. : 0.00
: Pemotongan Pohon Pilihan diameter > TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Galian Perkerasan berbutir TOTAL HARGA (Rp.) : 71,977.74
% THD. BIAYA PROYEK : 0.00
M2 1.0000 0.0 -
M2 1.0000 0.0 -
Analisa EI-352b
M2 1.0000 0.0 -
M2 1.0000 0.0 -
Analisa EI-353
M2 1.0000 0.0 -
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal lapis Agregat padat t
6 Berat isi padat Bip
7 Jam kerja efektif per-hari Tk
8 Lebar bahu jalan Lb
9 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
-Fraksi lolos Scalping Screen 0 - 5 mm PU
10 Berat Isi Agregat (lepas) Bil
Faktor kehilangan - Agregat A Fh
1. BAHAN
- Agregat A = 1 M3 x (Bip/Bil) x Fh (M26)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor Efisiensi alat Fa
Waktu Siklus :
- Memuat dan lain-lain Ts1
Kap. Prod./jam = V x Fa x 60 Q2
bip x Ts2
Koefisien Alat / M3 = 1 = 1 : Q2 (E08)
Kap.Prod. / jam = pa x Fa x 60 Q5
1000 x Wc
Koefisien Alat / M3 = 1 : Q5 (E23)
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1
Produksi Agregat / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal lapis Agregat padat t
6 Berat isi padat Bip
7 Jam kerja efektif per-hari Tk
8 Lebar bahu jalan Lb
9 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Fraksi lolos Scalping Screen 0 - 5 mm St
10 Berat volume agregat (lepas) Bil
- Agregat B Fh
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor Efisiensi alat Fa
Waktu siklus Ts1
- Memuat dan lain-lain T1
Ts1
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1
Produksi Agregat / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Semen diangkut dari Base Camp ke lapangan
dengan menggunakan Dump Truck
7 Satu hari dapat diselesaikan hamparan Soil Cement
sepanjang Ls
8 Faktor kehilangan bahan Fh
9 Tebal hamparan t
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas bak V
Faktor efisiensi alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu Siklus : Ts1
- Waktu tempuh isi = (L : v1) x 60 menit T1
- Waktu bongkar T3
- Waktu tempuh kosong = (L : v2) x 60 menit T2
- Lain-lain T4
Ts1
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jarak rata-rata sumber material ke lokasi pekerjaan L
5 Jam kerja efektif per-hari Tk
6 Berat isi padat Bip
7 Berat Isi lepas Bil
8 Harga pembayaran tidak termasuk semen ( semen
dibayar dalam item tersendiri)
9 Satu hari dapat diselesaikan hamparan Soil Cement
sepanjang Ls
10 Faktor kembang material (padat - lepas) Fk
11 Tebal hamparan padat t
12 Berat volme Aggregat (Lepas) D
1. BAHAN
Setiap M3 Soil Cement padat diperlukan = 1 x Fk (M08)
2. ALAT
2.a. WHEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu siklus : Ts1
- Muat T1
Ts1
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
Rp. 125,280.20 / M3
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor Efisiensi alat Fa
Waktu Siklus : V - loading Ts1
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L02)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As
- Minyak Tanah / Pencair K
7 Berat jenis bahan :
- Aspal Pen 60 atau Pen 80 D1
- Minyak Tanah / Pencair D2
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
II. URUTAN KERJA
1 Aspal dan minyak tanah dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compresor
3 Campuran aspal cair disemprotkan dengan Asphalt
Sprayer ke atas permukaan yang akan dilapis
4 Angkutan Aspal dan Minyak Tanah menggunakan
Dump Truck
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc
2. ALAT
2.a. APHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Faktor efisiensi kerja Fa
Kapasitas pompa aspal pas
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As
- Kerosene K
7 Berat jenis bahan :
- Aspal Pen 60 atau Pen 80 D1
- Minyak Flux / Pencair D2
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Kecepatan penyemprotan V
Kapasitas pompa aspal pas
Faktor effisiensi kerja Fa
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal lapis agregat padat t
6 Berat isi padat Bip
7 Jam kerja efektif per-hari Tk
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Fraksi lolos Scalping Screen 0 - 5 mm St
9 Berat volume agregat (lepas) Bil
Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1
Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2
Faktor kehilangan - Fraksi lolos Scalping Screen 0 - 5 mm Fh3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor Efisiensi alat Fa
Waktu Siklus : Ts1
- Memuat dan lain-lain T1
Ts1
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1
Produksi agregat / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt -
- Mandor = (Tk x M) : Qt -
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
PROP / KAB / KODYA : ……………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.2.(1)
0.15 M JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A
1.81 - SATUAN PEMBAYARAN : M3
7.00 Jam
1.00 M
28.00 % Gradasi harus
42.00 % memenuhi Spec. NO. KOMPONEN
30.00 %
1.51 ton/m3
1.05
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1. Agregat A (M26)
1.25861 M3
C. PERALATAN
1.50 M3 (lepas)
0.85 - kondisi sedang 1 Wheel Loader E15
0.83 - 2 Dump Truck E08
3 Motor Grader E13
0.45 menit panduan 4 Tandem Roller E17
5 Water Tanker E23
117.71 M3 6 Alat Bantu
0.0085 Jam
0.5043 Jam
Analisa EI-421
50.00 M
1.00 M
0.30 M
0.83 -
4.00 KM / Jam
2.00 lintasan 1 x pp
1.00 lajur
0.75 menit
1.00 menit
1.75 menit
106.71 M3
0.0094 Jam
1.50 KM / Jam
1.00 M
2.00 lintasan
1.00
0.30 m
0.75 -
84.38 M3
0.0119 Jam
4.00 M3
0.07 M3
100.00 liter/menit
0.83 -
71.14 M3
0.0141 Jam
Lump Sum
117.71 M3/Jam
823.99 M3
7.00 orang
1.00 orang
0.0595 Jam
0.0085 Jam
Analisa EI-421
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
PROP / KAB / KODYA : ……………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.2.(2a)
0.15 M JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B
1.81 SATUAN PEMBAYARAN : M3
7.00 Jam
1.00 M
18.00 % Gradasi harus
18.00 % memenuhi NO. KOMPONEN
64.00 % Spesifikasi
1.51 ton/m3
1.05
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1. Agregat B (M27)
1.2586 M3
1.50 M3 C. PERALATAN
0.85 - Pemuatan lepas
0.83 - sedang 1 Wheel Loader E15
2 Dump Truck E08
0.45 menit panduan 3 Motor Grader E13
4 Tandem Roller E17
0.45 menit 5 Water Tanker E23
6 Alat Bantu
117.71 M3
0.0085 Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
3.50 ton E. OVERHEAD & PROFIT
0.80 - F. HARGA SATUAN PEKERJAAN ( D + E )
20.00 KM / Jam Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
30.00 KM / Jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
1.18 menit dari nomor mata pembayaran. Harga Satuan yang dis
26.18 menit terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
17.45 menit 3 Biaya satuan untuk peralatan sudah termasuk bahan
2.00 menit 4 Biaya satuan sudah termasuk pengeluaran untuk selu
46.81 menit yang dibayar dari kontrak) dan biaya-biaya lainnya.
1.98 M3
0.5043 Jam
Analisa EI-422a
50.00 M
1.00 M
0.30 M
0.83 -
4.00 KM / Jam
2.00 lintasan 1 x pp
1.00 lajur
0.75 menit
1.00 menit
1.75 menit
106.71 M3
0.0094 Jam
1.50 KM / Jam
1.00 M
2.00 lintasan
1.00
0.30 m
0.83 -
93.38 M3
0.0107 Jam
71.14 M3
0.0141 Jam
117.71 M3/Jam
823.99 M3
7.00 orang
1.00 orang
0.0595 Jam
0.0085 Jam
Analisa EI-422a
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
PROP / KAB / KODYA : ……………………………………
8.73 Km ITEM PEMBAYARAN NO. : 4.2.(3)
7.00 Jam JENIS PEKERJAAN : Semen untuk Lapis Pondasi Se
SATUAN PEMBAYARAN : Ton
400.00 M
1.05 - NO. KOMPONEN
0.15 M
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
1,050.00 Kg
B. BAHAN
1. Semen (M12)
3.50 Ton
0.80 -
20.00 Km / Jam
30.00 Km / Jam
26.18 menit
30.00 menit
17.45 menit C. PERALATAN
5.00 menit 1. Dump Truck (E08)
78.63 menit
2.03 Ton
0.4914 Jam
6.00 M
7.50 %
1.60 ton / M3 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
43.20 Ton E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
15.00 orang berat untuk bahan-bahan.
1.00 orang 2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
dari nomor mata pembayaran. Harga Satuan yang dis
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
2.4306 Jam 3 Biaya satuan untuk peralatan sudah termasuk bahan
0.1620 Jam 4 Biaya satuan sudah termasuk pengeluaran untuk selu
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-423
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
PROP / KAB / KODYA : ……………………………………
8.73 Km ITEM PEMBAYARAN NO. : 4.2.(4)
7.00 Jam JENIS PEKERJAAN : Lapis Pondasi Semen Tanah
1.81 ton/m3 SATUAN PEMBAYARAN : M3
1.51 ton/m3
NO. KOMPONEN
400.00 M
1.20 -
0.15 M
1.60 ton/M3 A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1. Tanah Timbunan (M08)
C. PERALATAN
1. Wheel Loader (E15)
1.20 M3 2. Dump Truck (E08)
3. Motor Grader (E13)
4. Vibratory Roller (E19)
5. P. Tyre Roller (E18)
1.50 M3 lepas 6. Water Tanker (E23)
0.90 - Pemuatan sedang 7. Cold Milling (E36)
0.83 - 8. Alat Bantu
0.88 menit
26.18 menit
17.45 menit
2.00 menit
46.50 menit
Analisa EI-424
1.88 M3
0.5315 Jam
50.00 M
1.00 M
0.30 M
0.83 -
4.00 KM / Jam
2.00 lintasan 1 x pp
1.00 lajur
0.75 menit
1.00 menit
1.75 menit
106.71 M3
0.0094 Jam
1.50 Km / Jam
1.20 M
0.30 M
6.00 lintasan 3 x pp
1.00 lajur
0.83 -
37.35 M3
0.0268 Jam
2.50 Km / Jam
1.99 M
0.30 M
4.00 lintasan 2 x pp
1.00 lajur
0.83 -
154.85 M3
0.0065 Jam
4.00 M3
0.07 M3
100.00 liter/menit
0.83 -
71.14 M3
0.0141 Jam
Analisa EI-424
8.00 m/menit
1.00 M
1.00 lintasan
0.83 -
59.76 M3
0.0167 Jam
Lump Sump
124.64 M3/Jam
872.46 M3
7.00 orang
1.00 orang
0.0562 Jam
0.0080 Jam
Analisa EI-425
FORMULIR STAN
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING
A. TENAGA
1. Pekerja (L01)
2. Mandor (L02)
B. BAHAN
1. Chipping (M41)
1.90 Ton/M3
33 Kg.
C. PERALATAN
8,179.71 M2
110.45 M2
0.0091 Jam
Analisa EI-425
1,548.47 M3
0.0006 Jam
Lump Sum
8,179.71 M2
57,257.97 M2
20.00 orang
1.00 orang
0.0024 Jam
0.0001 Jam
Analisa EI-426
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
8.73 KM PROP / KAB / KODYA : ……………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 4.2.(6)
1.10 - JENIS PEKERJAAN : Bahan Aspal untuk Pekerjaan P
SATUAN PEMBAYARAN : Liter
95.24 % 100 bagian
4.76 % 5 bagian
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1. Aspal (M10)
2. Minyak Tanah (M11)
1.08 Kg
0.052 liter C. PERALATAN
4,800.00 liter
0.0002 Jam
10.00 orang
2.00 orang
Analisa EI-426
0.0021 Jam
0.0004 Jam
Analisa EI-427
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
8.73 KM PROP / KAB / KODYA : ……………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 4.2.(7)
1.10 - JENIS PEKERJAAN : Lapis Resap Pengikat
SATUAN PEMBAYARAN : Liter
56 % 100 bagian
44 % 80 bagian
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1. Aspal (M10)
2. Kerosene (M11)
0.6345 Kg.
0.4840 liter C. PERALATAN
4,800.00 liter
0.0002 Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
4,800.00 liter Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
berat untuk bahan-bahan.
0.0002 Jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
dari nomor mata pembayaran. Harga Satuan yang dis
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
4,800.00 liter 3 Biaya satuan untuk peralatan sudah termasuk bahan
33,600.00 liter 4 Biaya satuan sudah termasuk pengeluaran untuk selu
yang dibayar dari kontrak) dan biaya-biaya lainnya.
10.00 orang
2.00 orang
Analisa EI-427
0.0021 Jam
0.0004 Jam
Analisa EI-512
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
PROP / KAB / KODYA : ……………………………………
8.73 KM ITEM PEMBAYARAN NO. : 4.2.(2b)
0.15 M JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas S
1.81 SATUAN PEMBAYARAN : M3
7.00 jam
18.00 % Gradasi harus
18.00 % memenuhi
64.00 % Spesifikasi NO. KOMPONEN
1.51 ton/m3
1.05
1.05
1.05 A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1. Aggregat S M27
1.2586 M3
C. PERALATAN
1.50 M3 1. Wheel Loader (E15)
0.85 - lepas 2. Dump Truck (E08)
0.83 - kondisi sedang 3. Motor Grader (E13)
4. Tandem Roller (E17)
0.45 menit panduan 5. Water Tanker (E23)
0.45 menit 6. Alat Bantu
117.71 M3
0.0085 jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
E. OVERHEAD & PROFIT
3.50 ton F. HARGA SATUAN PEKERJAAN ( D + E )
0.83 - Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
20.00 KM/jam berat untuk bahan-bahan.
30.00 KM/jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
dari nomor mata pembayaran. Harga Satuan yang dis
1.18 menit terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
26.18 menit 3 Biaya satuan untuk peralatan sudah termasuk bahan
17.45 menit 4 Biaya satuan sudah termasuk pengeluaran untuk selu
2.00 menit yang dibayar dari kontrak) dan biaya-biaya lainnya.
46.81 menit
2.06 M3
0.4861 jam
Analisa EI-512
50.00 M
2.40 M
0.83 -
4.00 KM/jam
6.00 lintasan 1 x pp
3.00
0.30 M
0.75 menit
1.00 menit
1.75 menit
234.77 M3
0.0043 jam
3.00 KM/jam
1.20 M
6.00 lintasan
3.00
0.30 m
0.83 -
186.75 M3
0.0054 jam
4.00 M3
0.07 M3
100.00 liter/menit
0.83 -
71.14 M3
0.0141 jam
Lump Sum
117.71 M3/jam
823.99 M3
7.00 orang
1.00 orang
0.0595 jam
0.0085 jam
Analisa EI-512
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Pondasi Agregat Kelas A TOTAL HARGA (Rp.) : 317,288.79
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Pondasi Agregat Kelas B TOTAL HARGA (Rp.) : 312,354.04
% THD. BIAYA PROYEK : 0.02
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Semen untuk Lapis Pondasi Semen TanTOTAL HARGA (Rp.) : 753,911.06
% THD. BIAYA PROYEK : 0.05
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Pondasi Semen Tanah TOTAL HARGA (Rp.) : 125,280.20
% THD. BIAYA PROYEK : 0.01
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Bahan Aspal untuk Pekerjaan PelaburanTOTAL HARGA (Rp.) : 8,113.20
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Resap Pengikat TOTAL HARGA (Rp.) : 5,660.18
% THD. BIAYA PROYEK : 0.00
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Tebal lapis agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00
- Fraksi lolos Scalping Screen 0 - 5 mm PU 30.00
9 Berat Isi Agregat (lepas) Bil 1.51
Faktor kehilangan - Agregat A Fh1 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71
Produksi agregat / hari = Tk x Q1 Qt 823.99
Kebutuhan tenaga :
- Pekerja P 7.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0595
- Mandor = (Tk x M) : Qt (L03) 0.0085
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Tebal lapis agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 22.00
- Fraksi lolos Scalping Screen 0 - 5 mm St 60.00
9 Berat volume agregat (lepas) Bil 1.51
Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2 1.05
Faktor kehilangan - Fraksi lolos Scalping Screen 0 - 5 mm Fh3 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 0.45
Ts1 0.45
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71
Produksi agregat / hari = Tk x Q1 Qt 823.99
Kebutuhan tenaga :
- Pekerja P 7.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt - 0.0595
- Mandor = (Tk x M) : Qt - 0.0085
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Tebal lapis Agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Berat isi agregat (lepas) Bil 1.51
Faktor kehilangan - Agregat C Fh 1.05
1. BAHAN
Material Agregat Kelas C hasil produksi di Base Camp
Setiap 1 M3 Agregat padat diperlukan : 1 x (Bip/Bil) x Fh (M28) 1.2586
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu siklus Ts1
- Muat T1 0.45
Ts1 0.45
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 117.71
Ts1 x Bip/Bil
Koefisien Alat / M3 = 1 : Q1 (E15) 0.0085
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71
Produksi Agregat / hari = Tk x Q1 Qt 823.99
Kebutuhan tenaga :
- Pekerja P 7.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0595
- Mandor = (Tk x M) : Qt (L03) 0.0085
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jarak rata-rata sumber material ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Berat isi padat Bip 1.81
7 Berat Isi lepas Bil 1.51
8 Harga pembayaran tidak termasuk semen ( semen
dibayar dalam item tersendiri)
9 Satu hari dapat diselesaikan hamparan Soil Cement
sepanjang Ls 400.00
10 Faktor kembang material (padat - lepas) Fk 1.20
11 Tebal hamparan padat t 0.15
12 Berat volume tanah (lepas) Bj 1.30
13 Berat volume chip = Agg Kasar Bjc 1.40
1. BAHAN
Setiap M3 Soil Cement padat diperlukan = 1 x Fk (M08) 1.20
Curing membran = (1/t) x 0,2 1.33
Chipping = ((1/t) x 1,2)/1000)/bjc 0.01
2. ALAT
2.a. WHELL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor efisiensi alat Fa 0.83
Waktu siklus : Ts1
- Muat T1 0.45
Ts1 0.45
3. TENAGA
Produksi menetukan : WHEEL LOADER Q1 117.71
Produksi Soil Cement / hari = Tk x Q1 Qt 823.99
Kebutuhan tenaga :
- Pekerja P 21.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1784
- Mandor = (Tk x M) : Qt (L03) 0.0085
Rp. 105,819.54 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Semen diangkut dari Base Camp ke lapangan
dengan menggunakan Dump Truck
7 Satu hari dapat diselesaikan hamparan Soil Cement
sepanjang Ls 400.00
8 Faktor hilang Material Fh 1.05
9 Tebal hamparan t 0.15
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas bak V 3.50
Faktor efisiensi alat Fa 0.80
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus Ts1
- Waktu mengisi T1 30.00
- Waktu tempuh isi = (L : v1) x 60 T2 26.18
- Waktu bongkar T3 30.00
- Waktu tempuh kosong = (L : v2) x 60 T4 17.45
- Lain-lain T5 5.00
Ts1 108.63
3. TENAGA
Lebar Soil Cement b 6.00
Kadar semen : Spesifikasi 5.4.3 (1) = ( 3 - 12 ) % s 7.50
Berat jenis tanah Bj 1.60
Setiap hari dengan produksi = {(s : 100) x t x b x Ls} x Bj Qt 43.20
Kebutuhan tenaga :
- Pekerja P 15.00
- Mandor M 1.00
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.0
6 Tebal Lapis perkerasan beton padat t 0.30
7 Kadar Semen Minimum (Spesifikasi) Ks 365
8 Ukuran Agregat Maksimum Ag 19
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50
10 Perbandingan Camp. : Semen Sm 400.0
: Pasir Ps 791.0
: Agregat Kasar Kr 1,077.0
11 Berat Jenis Material :
- Beton D1 2.20
- Semen D2 1.25
- Pasir D3 1.30
- Agregat Kasar D4 1.40
II. URUTAN KERJA
1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Batching Plant
2 Pemasangan bekesting dan tulangan anyaman tunggal
3 Beton di-cor ke dalam bekisting dengan Slipform Paver
4 Beton setelah setting langsung digrooving dengan merata
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor efisiensi alat Fa 0.83
Waktu Siklus Ts1
- Muat T1 0.55
- Lain lain T2 1.00
Ts1 1.55
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506
- Tukang = (Tk x Tb) : Qt (L02) 0.7028
- Pekerja = (Tk x P) : Qt (L01) 1.4056
Rp. 1,463,958.29 / M2
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.0
6 Tebal Lapis pondasi bawah beton kurus t 0.10
7 Kadar Semen Minimum (Spesifikasi) Ks 250
8 Ukuran Agregat Maksimum Ag 19
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.60
10 Perbandingan Camp. : Semen Sm 302.0
: Pasir Ps 633.0
: Agregat Kasar Kr 1,207.0
11 Berat Jenis Material :
- Beton D1 2.20
- Semen D2 1.25
- Pasir D3 1.30
- Agregat Kasar D4 1.40
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004
- Tukang = (Tk x Tb) : Qt (L02) 0.4016
- Pekerja = (Tk x P) : Qt (L01) 1.5060
Rp. 511,966.62 / M2
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar CTSB (agregat, semen dan air) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.0
6 Tebal Lapis CTSB t 0.30
7 Kadar Semen Minimum (Spesifikasi) Ks 85.00
8 Ukuran Agregat Maksimum Ag 37
9 Berat isi padat Bip 1.81
10 Berat Isi Agregat (lepas) Bil 1.51
11 Perbandingan Camp. : Semen Sm 6.0
: Agregat Kasar Kr 94.0
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor efisiensi alat Fa 0.83
Waktu Siklus Ts1
- Muat T1 0.55
- Lain lain T2 1.00
Ts1 1.55
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 92.96
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506
- Tukang = (Tk x Tb) : Qt (L02) 0.3012
- Pekerja = (Tk x P) : Qt (L01) 1.0542
Rp. 139,744.91 / M2
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar CTB (agregat, semen dan air) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.0
6 Tebal Lapis CTB t 0.30
7 Kadar Semen Minimum (Spesifikasi) Ks 110.00
8 Ukuran Agregat Maksimum Ag 37
9 Berat isi padat Bip 1.81
10 Berat Isi Agregat (lepas) Bil 1.51
11 Perbandingan Camp. : Semen Sm 7.0
: Agregat Kasar Kr 93.0
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 92.96
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506
- Tukang = (Tk x Tb) : Qt (L02) 0.3012
- Pekerja = (Tk x P) : Qt (L01) 1.0542
Rp. 138,918.04 / M2
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Tebal lapis agregat padat t 0.20
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm A20-30 24.00
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm A5-10&10-20 21.24
- Fraksi lolos Scalping Screen 0 - 5 mm PU 54.76
9 Berat Isi lepas Bil 1.51
Faktor kehilangan - Lapis Pondasi Agregat Fh1 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71
Produksi agregat / hari = Tk x Q1 Qt 823.99
Kebutuhan tenaga :
- Pekerja P 7.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0595
- Mandor = (Tk x M) : Qt (L03) 0.0085
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Tebal Lapis perkerasan beton padat t 0.30
7 Kadar Semen Minimum (Spesifikasi) Ks 365
8 Ukuran Agregat Maksimum Ag 19
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50
10 Perbandingan Camp. : Semen Sm 400.0
: Pasir Ps 791.0
: Agregat Kasar Kr 1,077.0
11 Berat Jenis Material :
- Beton D1 2.20
- Semen D2 1.25
- Pasir D3 1.30
- Agregat Kasar D4 1.40
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor efisiensi alat Fa 0.83
Waktu Siklus Ts1
- Muat T1 0.55
- Lain lain T2 1.00
Ts1 1.55
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506
- Tukang = (Tk x Tb) : Qt (L02) 0.7028
- Pekerja = (Tk x P) : Qt (L01) 1.4056
Rp. 1.00 / M2
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
……………………………………………………
PROP / KAB / KODYA : ………………………………………………
KM ITEM PEMBAYARAN NO. : 5.1.(1)
M JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A
- SATUAN PEMBAYARAN : M3
jam
% Gradasi harus
% memenuhi Spec.
% NO. KOMPONEN SATUAN
ton/m3
A. TENAGA
B. BAHAN
1. Aggrgat A M26 M3
M3
M3 (lepas) C. PERALATAN
- kondisi sedang 1. Wheel Loader (E15) jam
- 2. Dump Truck (E08) jam
3. Motor Grader (E13) jam
menit panduan 4. Tandem Roller (E17) jam
5. Water Tanker (E23) jam
M3 6. Alat Bantu Ls
7.
jam
jam
Analisa EI-511
SATUAN KETERANGAN
M
M
-
KM/jam
lintasan 1 x pp
menit
menit
menit
M3
jam
KM/jam
M
lintasan
m
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
SATUAN KETERANGAN
Analisa EI-512
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
……………………………………………………
PROP / KAB / KODYA : ………………………………………………
KM ITEM PEMBAYARAN NO. : 5.1.(2)
M JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B
SATUAN PEMBAYARAN : M3
jam
% Gradasi harus
% memenuhi
% Spesifikasi NO. KOMPONEN SATUAN
ton/m3
A. TENAGA
B. BAHAN
1. Aggregat B M27 M3
M3
C. PERALATAN
M3 1. Wheel Loader (E15) jam
- lepas 2. Dump Truck (E08) jam
- kondisi sedang 3. Motor Grader (E13) jam
4. Tandem Roller (E17) jam
menit panduan 5. Water Tanker (E23) jam
menit 6. Alat Bantu Ls
M3
jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT 15.0
ton F. HARGA SATUAN PEKERJAAN ( D + E )
- Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
KM/jam berat untuk bahan-bahan.
KM/jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
menit terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
menit 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
menit 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
menit yang dibayar dari kontrak) dan biaya-biaya lainnya.
menit
M3
jam
Analisa EI-512
SATUAN KETERANGAN
M
M
-
KM/jam
lintasan 1 x pp
menit
menit
menit
M3
jam
KM/jam
M
lintasan
m
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
Analisa EI-512
SATUAN KETERANGAN
Analisa EI-521
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
……………………………………………………
PROP / KAB / KODYA : ………………………………………………
KM ITEM PEMBAYARAN NO. : 5.2,(1)
M JENIS PEKERJAAN : Lapis Permukaan Agregat Tanpa Penutu
- SATUAN PEMBAYARAN : M3
Jam
ton/M3
A. TENAGA
B. BAHAN
M3 Agregat lepas
M3 (lepas)
- Pemuatan sedang C. PERALATAN
-
1. Wheel Loader (E15) Jam
menit panduan 2. Dump Truck (E08) Jam
menit 3. Motor Grader (E13) Jam
4. Tandem Roller (E17) Jam
M3 5. Water Tanker (E23) Jam
6. Alat Bantu Ls
Jam 7.
ton
- D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
KM/jam E. OVERHEAD & PROFIT 15.0
KM/jam F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
menit berat untuk bahan-bahan.
menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
menit dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
menit terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
menit 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
M3 yang dibayar dari kontrak) dan biaya-biaya lainnya.
Jam
Analisa EI-521
SATUAN KETERANGAN
M
M
-
KM / Jam
lintasan
menit
menit
menit
M3
Jam
KM / Jam
M
lintasan
m
-
M3
Jam
M3
M3
liter/menit
-
M3
Jam
Lump Sum
M3 / Jam
M3
orang
orang
Jam
Jam
SATUAN KETERANGAN
Analisa EI-542
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
……………………………………………………
PROP / KAB / KODYA : ………………………………………………
Km ITEM PEMBAYARAN NO. : 5.4.(2)
Jam JENIS PEKERJAAN : Lapis Pondasi Semen Tanah
ton/m3 SATUAN PEMBAYARAN : M3
ton/m3
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam
2. Dump Truck (E08) Jam
M3 3. Motor Grader (E13) Jam
liter 4. Vibrator Roller (E19) Jam
m3 5. P. Tyre Roller (E18) Jam
6. Water Tanker (E23) Jam
7. Pulvi Mixer (E27) Jam
8. Alat Bantu Ls
M3 lepas
- Pemuatan sedang
-
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
menit panduan E. OVERHEAD & PROFIT 15.0
menit F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
M3 berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
Jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-542
SATUAN KETERANGAN
ton
-
KM/jam
KM/jam
menit
menit
menit
menit
menit
M3
Jam
M
M
-
Km / Jam
lintasan
menit
menit
menit
M3
Jam
Km / Jam
M
lintasan 3 x pp
M
-
M3
Jam
Km / Jam panduan
M
lintasan 2 x pp
m
-
M3
Jam
M3
M3
liter/menit
-
M3
Berlanjut ke hal. berikut
Analisa EI-542
SATUAN KETERANGAN
Jam
Km / Jam
M
lintasan
-
M3
Jam
Lump Sump
M3/Jam
M3
orang
orang
Jam
Jam
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
……………………………………………………
Km PROP / KAB / KODYA : ………………………………………………
Jam ITEM PEMBAYARAN NO. : 5.4.(1)
JENIS PEKERJAAN : Semen untuk Lapis Pondasi Semen Tan
SATUAN PEMBAYARAN : Ton
M
-
M NO. KOMPONEN SATUAN
A. TENAGA
Kg
B. BAHAN
1. Semen (M12) Kg
Ton
-
Km / Jam
Km / Jam
menit
menit
menit
menit C. PERALATAN
menit 1. Dump Truck (E08) Jam
menit
Ton/Jam
Jam
M
%
ton / M3 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
Ton E. OVERHEAD & PROFIT 15.0
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
orang berat untuk bahan-bahan.
orang 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
Jam 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
Jam 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-541
SATUAN KETERANGAN
Analisa El-532
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HAR
KM
jam NO. KOMPONEN SATUAN
m
Kg/M3
mm
- A. TENAGA
Kg/M3 Berdasarkan 1. Pekerja (L01) jam
Kg/M3 JMF & sesuai 2. Tukang (L02) jam
Kg/M3 dgn Spesifikasi 3. Mandor (L03) jam
T/M3
T/M3
T/M3 B. BAHAN
T/M3 1. Semen (M12) Kg
2 Pasir (M01a) M3
3 Agregat Kasar (M03) M3
4 Baja Tulangan Polos (M39a) Kg
5 Joint Sealent (M94) Kg
6 Cat Anti Karat (M95) Kg
7 Expansion Cap (M96) M2
8 Polytene 125 mikron (M97) Kg
9 Curing Compound (M98) Ltr
10 Formwork Plate M2
11 Paku (M18) Kg
Kg 12 Additive (M67a) Ltr
M3
M3
Kg Lihat Gambar
Kg C. PERALATAN
Kg 1 Wheel Loader E15 jam
M2 2 Batching Plant E43 jam
Kg 3 Truck Mixer E49 jam
Ltr 4 Con. Vibrator E20 jam
M2 5 Water Tank Truck E23 jam
Kg 6 Conc. Paver E42 jam
Ltr 7 Alat Bantu Ls
8
JUMLAH HARGA PE
M3 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
- E. OVERHEAD & PROFIT 15.0
- F. HARGA SATUAN PEKERJAAN ( D + E )
G. HARGA SATUAN PEKERJAAN / M3
menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
menit berat untuk bahan-bahan.
menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
liter
-
menit
menit
menit
menit
menit
M2
Jam
M3
-
KM / Jam
KM / Jam
menit
menit
menit
menit
menit
M3
Jam
M3
jam
M3
M3
-
liter/menit
M3
jam
M
M
M/menit
945
M3
jam
SATUAN KETERANGAN
M3
orang
orang
orang
jam
jam
jam
Analisa El-533
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HAR
KM
jam NO. KOMPONEN SATUAN
m
Kg/M3
mm
- A. TENAGA
Kg/M3 Berdasarkan 1. Pekerja (L01) jam
Kg/M3 JMF & sesuai 2. Tukang (L02) jam
Kg/M3 dgn Spesifikasi 3. Mandor (L03) jam
T/M3
T/M3
T/M3 B. BAHAN
T/M3 1. Semen (M12) Kg
2 Pasir (M01a) M3
3 Agregat Kasar (M03) M3
4 Multiplex 12 mm (M73) Lbr
5 Kayu Acuan (M99) M3
6 Paku (M18) Kg
Kg
M3
M3
Lbr
M3 C. PERALATAN
Kg 1 Wheel Loader E15 jam
2 Batching Plant E43 jam
3 Truck Mixer E49 jam
4 Con. Vibrator E20 jam
5 Water Tank Truck E23 jam
6 Conc. Paver E42 jam
7 Alat Bantu Ls
JUMLAH HARGA PE
M3 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
- E. OVERHEAD & PROFIT 15.0
- F. HARGA SATUAN PEKERJAAN ( D + E )
G. HARGA SATUAN PEKERJAAN / M3
menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
menit berat untuk bahan-bahan.
menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
Liter
-
menit
menit
menit
menit
menit
M2
Jam
M3
-
KM / Jam
KM / Jam
menit
menit
menit
menit
menit
M3
Jam
M3
jam
M3
M3
-
liter/menit
M3
jam
M
M
M/menit
945
M3
jam
SATUAN KETERANGAN
M3
orang
orang
orang
jam
jam
jam
Analisa El-551
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HAR
KM
jam NO. KOMPONEN SATUAN
m
Kg/M3
mm
- A. TENAGA
ton/m3 1. Pekerja (L01) jam
Kg/M3 Berdasarkan 2. Tukang (L02) jam
Kg/M3 JMF & sesuai 3. Mandor (L03) jam
dgn Spesifikasi
T/M3
T/M3 B. BAHAN
1. Semen (M12) Kg
Kg
M3
C. PERALATAN
1 Wheel Loader E15 jam
M3 2 Batching Plant E43 jam
- 3 Dump Truck E08 jam
- 4 Vibrator Roller jam
5 Water Tank Truck E23 jam
menit 6 Screed Paver jam
menit 7 Alat Bantu Ls
menit 8
M3
JUMLAH HARGA PE
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
Jam E. OVERHEAD & PROFIT 15.0
F. HARGA SATUAN PEKERJAAN ( D + E )
G. HARGA SATUAN PEKERJAAN / M3
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
Berlanjut ke hal. berikut. terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
Analisa El-551 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
URAIAN ANALISA HARGA SATUAN yang dibayar dari kontrak) dan biaya-biaya lainnya.
Lanjutan
SATUAN KETERANGAN
Liter
-
menit
menit
menit
menit
menit
M3
Jam
M3
-
KM / Jam
KM / Jam
menit
menit
menit
menit
menit
M3
Jam
Km / Jam
M
lintasan
M
-
M3
Jam
M3
M3
-
liter/menit
M3
jam
M
M
M/menit
M3
jam
SATUAN KETERANGAN
M3
orang
orang
orang
jam
jam
jam
Analisa EI-552
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HAR
KM
jam NO. KOMPONEN SATUAN
m
Kg/M3
mm
- A. TENAGA
ton/m3 1. Pekerja (L01) jam
Kg/M3 Berdasarkan 2. Tukang (L02) jam
Kg/M3 JMF & sesuai 3. Mandor (L03) jam
dgn Spesifikasi
T/M3
T/M3 B. BAHAN
1. Semen (M12) Kg
Kg
M3
C. PERALATAN
1 Wheel Loader E15 jam
2 Batching Plant E53 jam
3 Dump Truck E08 jam
4 Vibrator Roller E55 jam
5 Water Tank Truck E23 jam
6 Screed Paver E54 jam
7 Alat Bantu Ls
8
JUMLAH HARGA PE
M3 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
- E. OVERHEAD & PROFIT 15.0
- F. HARGA SATUAN PEKERJAAN ( D + E )
G. HARGA SATUAN PEKERJAAN / M3
menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
menit berat untuk bahan-bahan.
menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
Liter
-
menit
menit
menit
menit
menit
M3
Jam
M3
-
KM / Jam
KM / Jam
menit
menit
menit
menit
menit
M3
Jam
Km / Jam
M
lintasan
M
-
M3
Jam
M3
M3
-
liter/menit
M3
jam
M
M
M/menit
M3
jam
SATUAN KETERANGAN
M3
orang
orang
orang
jam
jam
jam
Analisa EI-522
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………
……………………………………………………
PROP / KAB / KODYA : ………………………………………………
KM ITEM PEMBAYARAN NO. : ………………………
M JENIS PEKERJAAN : Lapis Pondasi Agregat Tanpa Penutup A
ton/m3 SATUAN PEMBAYARAN : M3
jam
% Gradasi harus
% memenuhi Spec.
% NO. KOMPONEN SATUAN
ton/m3
A. TENAGA
B. BAHAN
M3
jam
Analisa EI-522
SATUAN KETERANGAN
M
M
-
KM/jam
lintasan
menit
menit
menit
M3
jam
KM/jam
M
lintasan
m
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
SATUAN KETERANGAN
Analisa EI-531
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HAR
KM
jam NO. KOMPONEN SATUAN
m
Kg/M3
mm
- A. TENAGA
% Berdasarkan 1. Pekerja (L01) jam
% JMF & sesuai 2. Tukang (L02) jam
% dgn Spesifikasi 3. Mandor (L03) jam
T/M3
T/M3
T/M3 B. BAHAN
T/M3 1. Semen (M12) Kg
2 Pasir (M01a) M3
3 Agregat Kasar (M03) M3
4 Baja Tulangan Polos (M39a) Kg
5 Joint Sealent (M94) Kg
6 Cat Anti Karat (M95) Kg
7 Expansion Cap (M96) M2
8 Polytene 125 mikron (M97) Kg
9 Curing Compound (M98) Ltr
10 Multiplex 12 mm (M73) Lbr
11 Kayu Acuan (M99) M3
Kg 12 Paku (M18) Kg
M3 13 Additive (M67a) Ltr
M3
Kg
Kg C. PERALATAN
Kg 1 Wheel Loader E15 jam
M2 2 Batching Plant E43 jam
Kg 3 Truck Mixer E49 jam
Ltr 4 Con. Vibrator E20 jam
Lbr 5 Water Tank Truck E23 jam
M3 6 Conc. Paver E42 jam
Kg 7 Alat Bantu Ls
Ltr 8
JUMLAH HARGA PE
M3 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
- E. OVERHEAD & PROFIT 15.0
- F. HARGA SATUAN PEKERJAAN ( D + E )
G. HARGA SATUAN PEKERJAAN / M3
menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
menit berat untuk bahan-bahan.
menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
Jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
liter
-
menit
menit
menit
menit
menit
M2
Jam
M3
-
KM / Jam
KM / Jam
menit
menit
menit
menit
menit
M3
Jam
M3
jam
M3
M3
-
liter/menit
M3
jam
M
M
M/menit
M3 945
jam
SATUAN KETERANGAN
M3
orang
orang
orang
jam
jam
jam
Analisa EI-511
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
dasi Agregat Kelas A TOTAL HARGA : 316,454.58
% THD. BIAYA PROYEK : 0.02
ERALATAN ( A + B + C ) 275,177.90
% x D 41,276.68
316,454.58
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
dasi Agregat Kelas B TOTAL HARGA : 307,898.72
% THD. BIAYA PROYEK : 0.02
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
mukaan Agregat Tanpa PenutuTOTAL HARGA : 263,807.30
% THD. BIAYA PROYEK : 0.02
ERALATAN ( A + B + C ) 229,397.65
% x D 34,409.65
263,807.30
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
dasi Semen Tanah TOTAL HARGA : 105,819.54
% THD. BIAYA PROYEK : 0.01
ERALATAN ( A + B + C ) 92,016.99
% x D 13,802.55
105,819.54
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
uk Lapis Pondasi Semen Tan TOTAL HARGA : 782,258.71
% THD. BIAYA PROYEK : 0.05
ERALATAN ( A + B + C ) 680,224.97
% x D 102,033.74
782,258.71
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
an Beton Semen dengan ATOTAL HARGA (Rp.) : 1,463,958.29
% THD. BIAYA PROYEK : 0.09
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
ndasi bawah Beton Kurus TOTAL HARGA (Rp.) : 511,966.62
% THD. BIAYA PROYEK : 0.03
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
ndasi Atas Bersemen (CemTOTAL HARGA (Rp.) : 138,918.04
% THD. BIAYA PROYEK : 0.01
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
ndasi Bawah (Cement TreaTOTAL HARGA (Rp.) : 139,744.91
% THD. BIAYA PROYEK : 0.01
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
dasi Agregat Tanpa Penutup ATOTAL HARGA : 315,879.78
% THD. BIAYA PROYEK : 0.02
ERALATAN ( A + B + C ) 274,678.07
% x D 41,201.71
315,879.78
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
an Jalan Beton TOTAL HARGA (Rp.) : 893,493.59
% THD. BIAYA PROYEK : 0.05
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As
- Kerosene K
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 2 D1
- Kerosene D2
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Kecepatan penyemprotan V
Kapasitas pompa aspal pas
Faktor effisiensi kerja Fa
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran (Spesifikasi) :
- Aspal Pen 60 atau Pen 80 As
- Kerosene K
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1
- Kerosene D2
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Kecepatan penyemprotan v
Kapasitas pompa aspal pas
Faktor effesiensi kerja Fa
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pekerjaan ini tidak termasuk aspal
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L
6 Jam kerja efektif per-hari Tk
7 Berat Isi Agregat Chipping : padat Bip
lepas Bil
8 Faktor Kehilangan Fh
9 Tebal SBST t
10 Lapisan SBST terdiri dari (spesifikasi) :
- Menggunakan material ukuran Ld
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor Efisiensi alat Fa
Waktu Siklus : V - loading Ts1
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L02)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pekerjaan ini tidak termasuk aspal
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L
6 Jam kerja efektif per-hari Tk
7 Berat Isi Agregat Chipping : padat Bip
lepas Bil
8 Faktor Kehilangan Fh
9 Tebal DBST t
10 Lapisan DBST terdiri dari (spesifikasi) :
- Lapisan pertama ukuran normal = 13 mm
- Lapis kedua ukuran normal Ld
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus V - Loading Ts1
Ts1
3. TENAGA
Produksi menentukan : Wheel Loader Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis Latasir padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan material : - Agregat Fh1
- Aspal Fh2
Berat isi Agregat (padat) Bip
Berat Isi Agregat (lepas) Bil
9 Komposisi campuran SS Kelas A
- Pasir Kasar PK
- Pasir Halus PH
- Semen FF
- Asphalt As
10 Berat Isi bahan :
- Latasir (SS) Kelas A D1
- Pasir Kasar D2
- Pasir Halus D3
11 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Pasir Kasar = (PK x Fh1) : D2 (M01d)
1.b. Pasir Halus = (PH x Fh1) : D3 (M01c)
1.c. Semen = (FF x Fh1) x 1000 (M05)
1.d. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
D1 x t x Ts2
Kecepatan rata-rata v
Lebar efektif pemadatan b
Jumlah lintasan n
Lajur lintasan N
Lebar Overlap bo
Faktor Efisiensi alat Fa
3. TENAGA
Produksi menentukan : Mixing Plant Q2
Produksi Latasir / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis Latasir padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran SS Kelas B
- Pasir Kasar M01a PK
- Pasir Halus M01c PH
- Semen FF
- Asphalt As
11 Berat Isi bahan :
- Latasir (SS) Kelas B D1
- Pasir Kasar D2
- Pasir Halus D3
12 Jarak Stock pile ke Cold Bin l
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
D1 x t x Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi Latasir / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (HRS) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan material : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran HRS
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Pasir Halus PH
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
11 Berat isi bahan :
- HRS-WC D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
- Pasir Halus D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Pasir Halus = (PH x Fh1) : D4 (M01c)
1.d. Semen = (FF x Fh1) x 1000 (M05)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Koefisien Alat / ton = 1 : Q2 (E01)
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : Asphalt Finisher Q5
Produksi HRS / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (HRS) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan material : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran HRS
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Pasir Halus PH
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
11 Berat isi bahan :
- HRS-WC D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
- Pasir Halus D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Pasir Halus = (PH x Fh1) : D4 (M01c)
1.d. Semen = (FF x Fh1) x 1000 (M05)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : Asphalt Finisher Q5
Produksi HRS / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (HRS BASE) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran HRS BASE :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Pasir Halus PH
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
11 Berat isi bahan :
- HRS BASE D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
- Pasir Halus D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Pasir Halus = (PH x Fh1) : D4 (M01c)
1.d. Semen = (FF x Fh1) x 1000 (M05)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : Asphalt Finisher Q5
Produksi HRS BASE / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (HRS BASE) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran HRS BASE :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Pasir Halus PH
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
11 Berat isi bahan :
- HRS BASE D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
- Pasir Halus D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Pasir Halus = (PH x Fh1) : D4 (M01c)
1.d. Semen = (FF x Fh1) x 1000 (M05)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
ITEM PEMBAYARAN NO. : 6.3.(4b)
JENIS PEKERJAAN : Lataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi senjang)
SATUAN PEMBAYARAN : Ton
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : Asphalt Finisher Q5
Produksi HRS BASE / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh1) x 1000 (M05)
1.d. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC-WC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Bahan modifikasi yang digunakan:
11 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt Modifikasi As
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh1) x 1000
1.d. Aspal Modifikasi = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-WC / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC-WC L) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Bahan modifikasi yang digunakan:
11 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
,- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
12 Berat isi bahan :
- AC-WC D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
13 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh1) x 1000 (M05)
1.d. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : A M P Q2
Produksi AC-WC / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC-WC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Bahan modifikasi yang digunakan:
11 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Filler Added PC
- Asphalt As
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Filler Added = (PC x Fh1 x 1000
1.d. Aspal Modifikasi = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-WC / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran AC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
11 Berat Isi bahan :
- AC-BC D1
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D2
- Agr Pch Mesin 0 - 5 mm D3
12 Jarak Stock file ke cold bin l
1. BAHAN
1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh1) x 1000 (M05)
1.d. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Bahan modifikasi yang digunakan:
11 Komposisi campuran AC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Filler Added (PC) PC
- Asphalt Modifikasi As
1. BAHAN
1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Filler Added = (PC x Fh1 x 1000
1.d. Aspal Modifikasi = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran AC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
11 Berat Isi bahan :
- AC-BC D1
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D2
- Agr Pch Mesin 0 - 5 mm D3
12 Jarak Stock file ke cold bin l
1. BAHAN
1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Semen = (FF x Fh1) x 1000 (M05)
1.d. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / ton :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Bahan modifikasi yang digunakan:
11 Komposisi campuran AC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Filler Added PC
- Asphalt Modifikasi As
1. BAHAN
1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Filler Added = (PC x Fh1 x 1000
1.d. Aspal Modifikasi = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
Koefisien Alat / ton = 1 : Q4 (E08)
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran AC-Base :
- Agr Pch Mesin 20 - 30 mm 20-30
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
11 Berat Isi bahan :
- AC-Base D1
- Agr Pch Mesin 20 - 30 mm D2
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D3
- Agr Pch Mesin 0 - 5 mm D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 20-30 = ("20-30" x Fh1) : D2 (M93)
1.b. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D3 (M92)
1.c. Agr 0-5 = ("0-5" x Fh1) : D4 (M91)
1.d. Semen = (FF x Fh1) x 1000 (M05)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Bahan modifikasi yang digunakan:
11 Komposisi campuran AC-Base :
- Agr Pch Mesin 20 - 30 mm 20-30
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Filler Added (PC) PC
- Asphalt Modifikasi As
1. BAHAN
1.a. Agr 20-30 = ("20-30" x Fh1) : D2 (M93)
1.b. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D3 (M92)
1.c. Agr 0-5 = ("0-5" x Fh1) : D4 (M91)
1.d. Filler Added = (PC x Fh1 x 1000
1.e. Aspal Modifikasi = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap. Prod./jam = V x Fb x Fa x 60 Q1
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran AC-Base :
- Agr Pch Mesin 20 - 30 mm 20-30
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Semen FF
- Asphalt As
- Anti Stripping Agent Asa
11 Berat Isi bahan :
- AC-Base D1
- Agr Pch Mesin 20 - 30 mm D2
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D3
- Agr Pch Mesin 0 - 5 mm D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 20-30 = ("20-30" x Fh1) : D2 (M93)
1.b. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D3 (M92)
1.c. Agr 0-5 = ("0-5" x Fh1) : D4 (M91)
1.d. Semen = (FF x Fh1) x 1000 (M05)
1.e. Aspal = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Bahan modifikasi yang digunakan:
11 Komposisi campuran AC-Base :
- Agr Pch Mesin 20 - 30 mm 20-30
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Filler Added PC
- Asphalt Modifikasi As
1. BAHAN
1.a. Agr 20-30 = ("20-30" x Fh1) : D2 (M93)
1.b. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D3 (M92)
1.c. Agr 0-5 = ("0-5" x Fh1) : D4 (M91)
1.d. Filler Added = (PC x Fh1 x 1000
1.e. Aspal Modifikasi = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap. Prod./jam = V x Fb x Fa x 60 Q1
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan buruh dan alat (semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum Sa
- Kadar Aspal terhadap berat total campuran As
- Tebal nominal padat t
6 Berat isi bahan :
- Campuran Aspal Dingin (diambil) D1
- Aspal (diambil) D2
- Agregat lepas (diambil) D3
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04)
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31)
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V
Faktor Efisiensi Alat Fa
Waktu siklus : Ts1
- Memuat T1
- Mengaduk T2
- Menuang T3
- Tunggu, dll. T4
Ts1
Kap.Prod. / jam = V x Fa x 60 Q3
D1 x Ts2
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1
Produksi Campuran dalam 1 hari = Tk x Q1 Qt
Kebutuhan tenaga : - Mandor M
- Pekerja P
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03)
- Pekerja = (Tk x P) : Qt (L01)
Rp. 1,244,344.87 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal rata2 Lapen t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan - Agregat Fh1
Fator kehilangan - Aspal Fh2
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak
- Agregat Pengunci Ap1
- Agregat Penutup Ap2
- Aspal : - Paska Agregat Pokok As1
- Paska Agregat Pengunci As2
As
9 Berat isi bahan :
- Agregat D1
- Aspal D2
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03)
1.b. Agregat Pengunci = {(Ap1/1000 : t M3) x Fh1} : D1 (M04)
1.c. Agregat Penutup = {(Ap2/1000 : t M3) x Fh1} : D1 (M04)
1.d. Aspal = {((As1+As2) : t M3) x Fh2} (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus Ts1
Kap.Prod. / jam = V x Fa x 60 Q2
Ts2 x D1
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1
Produksi Lapen / hari = Q1 x Tk Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal rata2 Lapen t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan - Agregat Fh1
Faktor kehilangan - Aspal Fh2
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak
- Agregat Pengunci Ap1
- Aspal : - Paska Agregat Pokok As1
As
9 Berat isi bahan :
- Agregat D1
- Aspal D2
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03)
1.b. Agregat Pengunci = {(Ap1/1000 : t M3) x Fh1} : D1 (M04)
1.c. Aspal = {((As1) : t M3) x Fh2} (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus Ts1
Kap.Prod. / jam = V x Fa x 60 Q2
D1 x Ts2
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1
Produksi Lapen / hari = Q1 x Tk Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran :
- Aspal Emulsi Ae
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat Aspal Emulsi
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Kecepatan penyemprotan V
Kapasitas pompa aspal pas
Faktor effisiensi kerja Fa
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran :
- Aspal Emulsi Ae
- Air A
7 Berat isi bahan :
- Aspal Emulsi D1
- Air D2
8 Bahan dasar aspal emulsi kationik / anionik
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Perekat
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Kecepatan penyemprotan V
Kapasitas pompa aspal pas
Faktor effisiensi kerja Fa
Kap. Prod. / jam = pas x Fa x 60 Q1
Koefisien Alat / Ltr = 1 : Q1 (E41)
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran :
- Aspal Emulsi Ae
- Bahan Modifikasi Bm
7 Berat isi bahan :
- Aspal Emulsi D1
1. BAHAN
Untuk mendapatkan 1 liter Lapis Perekat
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Kecepatan penyemprotan V
Kapasitas pompa aspal pas
Faktor effisiensi kerja Fa
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As
- Kerosene K
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1
- Kerosene D2
8 Bahan dasar aspal semuanya diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc
2. ALAT
2.a. APHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Faktor efisiensi kerja Fa
Kapasitas pompa aspal pas
3. TENAGA
Produksi menentukan : ASPHALT DISTIRBUTOR Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran :
- Aspal Modifikasi As
- Kerosene K
7 Berat isi bahan :
- Aspal Modifikasi D1
- Kerosene D2
8 Bahan dasar (aspal & bahan modifikasi) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc
2. ALAT
2.a. APHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Faktor efisiensi kerja Fa
Kapasitas pompa aspal pas
3. TENAGA
Produksi menentukan : ASPHALT DISTIRBUTOR Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
1. BAHAN
Untuk mendapatkan 1 liter aspal cair untuk precoated
diperlukan : ( 1 liter x Fh ) PC
1a Aspal = As x Pc x D2 (M10)
1b Kerosene = K x Pc x D3 (M11)
2. ALAT
2.a. PAN MIXER (E43)
Kapasitas Alat V
Faktor Efisiensi Alat Fa
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1
- Mengaduk T2
- Menuang T3
- Menunggu, dll. T4
Ts1
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat mekanik pencampuran aspal emulsi untuk precoated
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran :
- Aspal Emulsi Ae
- Kerosene K
7 Berat isi bahan :
- Aspal Emulsi D1
- Kerosene D2
8 Bahan dasar aspal emulsi diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter aspal cair untuk precoated
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. PAN MIXER (E43)
Kapasitas Alat V
Faktor Efisiensi Alat Fa
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1
- Mengaduk T2
- Menuang T3
- Menunggu, dll. T4
Ts1
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat mekanik pencampuran aspal emulsi mod.untuk precoated
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran :
- Aspal Emulsi Ae
- Kerosene K
- Bahan Modifikasi Bm
7 Berat isi bahan :
- Aspal Emulsi D1
- Kerosene D2
8 Bahan dasar aspal emulsi diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter aspal cair untuk precoated
diperlukan : PC
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
8.73 KM PROP / KAB / KODYA : ……………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 6.1 (1)(a)
1.03 - JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal C
SATUAN PEMBAYARAN : Liter
64 % terhadap volume
36 % terhadap volume
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1. Aspal (M10)
2. Kerosene (M11)
1.03 liter
0.6790 Kg.
0.3708 Liter C. PERALATAN
4,800.00 liter
0.0002 Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
4,800.00 liter Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
berat untuk bahan-bahan.
0.0002 Jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
dari nomor mata pembayaran. Harga Satuan yang dis
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
3 Biaya satuan untuk peralatan sudah termasuk bahan
4,800.00 liter 4 Biaya satuan sudah termasuk pengeluaran untuk selu
33,600.00 liter yang dibayar dari kontrak) dan biaya-biaya lainnya.
10.00 orang
2.00 orang
Analisa EI-611a
0.0021 Jam
0.0004 Jam
Analisa EI-612a
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
8.73 KM PROP / KAB / KODYA : ……………………………………
7.00 Jam ITEM PEMBAYARAN NO. : 6.1 (2)(a)
1.03 - JENIS PEKERJAAN : Lapis Perekat - Aspal Cair
SATUAN PEMBAYARAN : Liter
80 % terhadap volume
20 % terhadap volume
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1. Aspal (M10)
2. Kerosene (M11)
1.03 liter
0.8487 Kg
0.2060 liter
C. PERALATAN
4,800.00 liter
0.0002 Jam
0.0021 Jam
0.0004 Jam
Analisa EI-612a
URAIAN ANALISA HARGA SATUAN
Lanjutan
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 6.2 (1)
8.73 Km JENIS PEKERJAAN : Agregat Penutup BURTU
7.00 Jam SATUAN PEMBAYARAN : M2
1.47 -
1.27
1.05
1.50 Cm NO. KOMPONEN
1.30 Cm
A. TENAGA
1. Pekerja (L01)
2. Mandor (L02)
B. BAHAN
1. Chipping (M41)
23 Kg.
C. PERALATAN
Analisa EI-621
3.50 ton
0.80 - kondisi sedang
20.00 KM / Jam
30.00 KM / Jam
117.19 menit
26.18 menit
2.00 menit
17.45 menit
162.81 menit
46.80 M2
0.0214 Jam
1,857.13 M2
0.00054 Jam
Lump Sum
94.07 M2
658.47 M2
20.00 orang
1.00 orang
0.2126 Jam
0.0106 Jam
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 6.2 (2)
8.73 KM JENIS PEKERJAAN : Agregat Penutup BURDA
7.00 jam SATUAN PEMBAYARAN : M2
1.47 -
1.27
1.05
2.50 Cm NO. KOMPONEN
6.00 mm
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
1. Chipping (M41)
6.70 -
0.0088 M3
35 Kg.
Analisa EI-622
3.50 ton
0.80 - kondisi sedang
20.00 KM / Jam
30.00 KM / Jam
101.25 menit
26.18 menit
2.00 menit
17.45 menit
146.87 menit
31.13 M2 / Jam
0.0321 Jam
928.56 M2
0.0011 Jam
Lump Sum
56.44 M2
395.08 M2
20.00 orang
1.00 orang
0.3544 Jam
0.0177 Jam
Analisa EI-631
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
PROP / KAB / KODYA : ……………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.3 (1)
0.015 M Tabel 6.3.1 (2) JENIS PEKERJAAN : Latasir Kelas A (SS-A)
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3 NO. KOMPONEN
29.00 %
58.00 % Gradasi harus -
3.00 % memenuhi - A. TENAGA
10.00 % Spesifikasi
1. Pekerja (L01)
2.20 ton / M3 2. Mandor (L03)
1.46 ton / M3
1.46 ton / M3
0.05 km
B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
0.2086 M3 6. Tandem Roller E17
0.4171 M3 7 P. Tyre Roller E18
31.5000 Kg 8 Alat Bantu
103.0000 Kg
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
1.50 M3 E. OVERHEAD & PROFIT
0.85 - F. HARGA SATUAN PEKERJAAN ( D + E )
0.83 - Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
1.10 menit berat untuk bahan-bahan.
15.00 km/jam panduan 2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
20.00 km/jam panduan dari nomor mata pembayaran. Harga Satuan yang dis
0.20 menit terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
0.15 menit 3 Biaya satuan untuk peralatan sudah termasuk bahan
0.75 menit 4 Biaya satuan sudah termasuk pengeluaran untuk selu
yang dibayar dari kontrak) dan biaya-biaya lainnya.
104.48 ton
0.0096 Jam
Analisa EI-631
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
81.95 ton
0.0122 Jam
0.0386 Jam
8.10 ton
1.50 Km / Jam
1.48 M
6.00 lintasan
3.00
0.30 m
0.83 -
31.52 ton
0.0317 Jam
2.50 KM / jam
1.99 M
4.00 lintasan
3.00
0.30 M
0.83 -
91.98 ton
0.0109 Jam
Analisa EI-631
49.80 M2
348.60 M2
7.00 orang
1.00 orang
0.1406 Jam
0.0201 Jam
Analisa EI-632
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
PROP / KAB / KODYA : ……………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.3 (2)
0.020 M Tabel 6.3.1 (2) JENIS PEKERJAAN : Latasir Kelas B (SS-B)
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3 NO. KOMPONEN
B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
0.0139 M3 6. Tandem Roller E17
0.0139 M3 7 P. Tyre Roller E18
31.5000 Kg 8 Alat Bantu
92.7000 Kg
104.48 ton
0.0096 Jam
Analisa EI-632
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
61.46 M2
0.0163 Jam
0.0290 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan
3.00
0.30 m
0.83 -
42.02 ton
0.0238 Jam
2.50 KM / jam
1.99 M
4.00 lintasan
3.00
0.30 M
0.83 -
122.57 ton
0.0082 Jam
Analisa EI-632
Lump Sum
49.80 M2
348.60 M2
7.00 orang
1.00 orang
0.1406 Jam
0.0201 Jam
Analisa EI-633a
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
PROP / KAB / KODYA : ……………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.3(3a)
0.03 M JENIS PEKERJAAN : Lataston Lapis Aus (HRS-WC)
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3 NO. KOMPONEN
2.23 ton / M3
1.42 ton / M3
1.57 ton / M3
1.46 ton / M3 B. BAHAN
0.05 km
1. Agr 5-10 & 10-15
2. Lolos screen2 ukuran ( 0 - 5)
3 Pasir Halus (M01c)
4 Semen (M05)
5 Aspal (M10)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
6. Tandem Roller E17
0.2440 M3 7 P. Tyre Roller E18
0.1538 M3 8 Alat Bantu
0.2481 M3
23.1000 Kg
75.1900 Kg
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
1.50 M3 panduan berat untuk bahan-bahan.
0.85 - 2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
0.83 - dari nomor mata pembayaran. Harga Satuan yang dis
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
15.00 km/jam panduan 3 Biaya satuan untuk peralatan sudah termasuk bahan
20.00 km/jam panduan 4 Biaya satuan sudah termasuk pengeluaran untuk selu
0.20 menit yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.15 menit
0.75 menit
1.10 menit
Analisa EI-633a
104.48 ton
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 ton
0.80 -
20.00 KM / Jam
30.00 KM / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 ton
0.3698 Jam
5.00 m/menit
0.83 -
3.15 meter
52.47 ton
0.0191 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 Awal & 4 Akhir
3.00
0.30 m
0.83 -
63.90 ton
0.0157 Jam
4.00 KM / jam
2.29 M
6.00 lintasan
3.00
0.30 M
0.83 -
232.10 M2
0.0043 Jam
Analisa EI-633a
Lump Sum
52.47 ton
367.31 ton
7.00 orang
1.00 orang
0.1334 Jam
0.0191 Jam
Analisa EI-633a
njang/semi senjang)
URAIAN ANALISA HARGA SATUAN FORMULIR STAN
PEREKAMAN ANALISA MASING
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
PROP / KAB / KODYA : ……………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.3(3b)
0.03 M JENIS PEKERJAAN : Lataston Lapis Aus Perata (HR
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3 NO. KOMPONEN
2.23 ton / M3
1.42 ton / M3
1.57 ton / M3
1.46 ton / M3 B. BAHAN
0.05 km
1. Agr 5-10 & 10-15
2. Lolos screen2 ukuran ( 0 - 5)
3 Pasir Halus (M01c)
4 Semen (M05)
5 Aspal (M10)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
6. Tandem Roller E17
0.2440 M3 7 P. Tyre Roller E18
0.1538 M3 8 Alat Bantu
0.2481 M3
23.1000 Kg
75.1900 Kg
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
1.50 M3 panduan berat untuk bahan-bahan.
0.85 - 2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
0.83 - dari nomor mata pembayaran. Harga Satuan yang dis
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
15.00 km/jam panduan 3 Biaya satuan untuk peralatan sudah termasuk bahan
20.00 km/jam panduan 4 Biaya satuan sudah termasuk pengeluaran untuk selu
0.20 menit yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.15 menit
0.75 menit
1.10 menit
Analisa EI-633a
ng/semi senjang)
URAIAN ANALISA HARGA SATUAN
Lanjutan
104.48
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 ton
0.80 -
20.00 KM / Jam
30.00 KM / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 M2
0.3698 Jam
5.00 m/menit
0.83 -
3.15 meter
52.47 ton
0.0191 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 Awal & 4 Akhir
3.00
0.30 m
0.83 -
63.90 ton
0.0157 Jam
4.00 KM / jam
2.29 M
6.00 lintasan
3.00
0.30 M
0.83 -
232.10 M2
0.0043 Jam
Analisa EI-633a
ng/semi senjang)
URAIAN ANALISA HARGA SATUAN
Lanjutan
Lump Sum
52.47 ton
367.31 ton
7.00 orang
1.00 orang
0.1334 Jam
0.0191 Jam
Analisa EI-634a
g/semi senjang)
URAIAN ANALISA HARGA SATUAN FORMULIR STAN
PEREKAMAN ANALISA MASING
2.23 ton / M3
1.42 ton / M3 B. BAHAN
1.57 ton / M3
1.46 ton / M3 1. Agr 5-10 & 10-15 (M92)
0.05 km 2. Lolos screen2 ukuran ( 0 (M91)
3 Pasir Halus (M01c)
4 Semen (M05)
5 Aspal (M10)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
6. Tandem Roller E17
7 P. Tyre Roller E18
8 Alat Bantu
0.2958 M3
0.1404 M3 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
0.2265 M3 E. OVERHEAD & PROFIT
15.7500 Kg F. HARGA SATUAN PEKERJAAN ( D + E )
61.8000 Kg Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
dari nomor mata pembayaran. Harga Satuan yang dis
1.50 M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
0.85 - 3 Biaya satuan untuk peralatan sudah termasuk bahan
0.83 - 4 Biaya satuan sudah termasuk pengeluaran untuk selu
yang dibayar dari kontrak) dan biaya-biaya lainnya.
15.00 km/jam panduan
20.00 km/jam panduan
0.20 menit
0.15 menit
0.75 menit
1.10 menit
Analisa EI-634a
emi senjang)
URAIAN ANALISA HARGA SATUAN
Lanjutan
104.48 ton
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 ton
0.80 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 ton
0.3698 Jam
20.00 m/menit
0.83 -
3.15 meter
244.87 ton
0.0041 Jam
3.50 Km / Jam
1.68 M
6.00 lintasan 2 Awal & 4 Akhir
1.00
0.30 m
0.83 -
63.49 ton
0.0158 Jam
4.00 KM / Jam
2.29 M
8.00 lintasan
3.00
0.30 M
0.83 -
203.09 ton
Analisa EI-634a
emi senjang)
URAIAN ANALISA HARGA SATUAN
Lanjutan
0.0049 Jam
Lump Sum
244.87 ton
1,714.12 ton
7.00 orang
1.00 orang
0.0286 Jam
0.0041 Jam
Analisa EI-634b
asi senjang/semi senjang)
URAIAN ANALISA HARGA SATUAN FORMULIR STAN
PEREKAMAN ANALISA MASING
2.23 ton / M3
1.42 ton / M3 B. BAHAN
1.57 ton / M3
1.46 ton / M3 1. Agr 5-10 & 10-15 (M92)
0.05 km 2. Lolos screen2 ukuran ( 0 (M91)
3 Pasir Halus (M01c)
4 Semen (M05)
5 Aspal (M10)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
6. Tandem Roller E17
7 P. Tyre Roller E18
8 Alat Bantu
0.2958 M3
0.1404 M3 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
0.2265 M3 E. OVERHEAD & PROFIT
15.7500 Kg F. HARGA SATUAN PEKERJAAN ( D + E )
61.8 Kg Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
dari nomor mata pembayaran. Harga Satuan yang dis
1.50 M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
0.85 - 3 Biaya satuan untuk peralatan sudah termasuk bahan
0.83 - 4 Biaya satuan sudah termasuk pengeluaran untuk selu
yang dibayar dari kontrak) dan biaya-biaya lainnya.
15.00 km/jam panduan
20.00 km/jam panduan
0.20 menit
0.15 menit
0.75 menit
1.10 menit
Berlanjut ke hal. berikut.
Analisa EI-634b
senjang/semi senjang)
URAIAN ANALISA HARGA SATUAN
Lanjutan
104.48 ton
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 ton
0.80 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 ton
0.3698 Jam
20.00 m/menit
0.83 -
3.15 meter
244.87 ton
0.0041 Jam
3.50 Km / Jam
1.68 M
6.00 lintasan 2 Awal & 4 Akhir
1.00
0.30 m
0.83 -
63.49 ton
0.0158 Jam
4.00 KM / Jam
2.29 M
8.00 lintasan
3.00
0.30 M
0.83 -
203.09 ton
Analisa EI-634b
senjang/semi senjang)
URAIAN ANALISA HARGA SATUAN
Lanjutan
0.0049 Jam
Lump Sum
244.87 ton
1,714.12 ton
7.00 orang
1.00 orang
0.0286 Jam
0.0041 Jam
Analisa EI-635a
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asp. Finisher E02
6. Tandem Roller E17
0.2978 M3 7 P. Tyre Roller E18
0.3523 M3 8 Alat Bantu
9.8700 Kg
62.8300 Kg
104.48 ton
0.0096 Jam
Analisa EI-635a
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 Ton
0.80 -
20.00 KM / Jam
30.00 KM / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 ton
0.3698 Jam
5.00 m/menit
0.83 -
3.15 meter
72.79 ton
0.0137 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 Awal & 4 Akhir
3.00
0.83 -
0.30 M
0.0000 ton
73.94
0.0135 Jam
2.50 KM / jam
1.99 M
6.00 lintasan
3.00
0.30 M
0.83 -
172.34 ton
0.0058 Jam
Analisa EI-635a
Lump Sum
49.80 M2 / Jam
348.60 M2
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-635b
1. Pekerja (L01)
2. Mandor (L03)
2.32 ton / M3
1.42 ton / M3
1.57 ton / M3
0.05 km
B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asp. Finisher E02
6. Tandem Roller E17
0.2975 M3 7 P. Tyre Roller E18
0.3519 M3 8 Alat Bantu
9.8700 Kg
63.8600 Kg
Analisa EI-635b
104.48 ton
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 Ton
0.80 -
20.00 KM / Jam
30.00 KM / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 ton
0.3698 Jam
5.00 m/menit
0.83 -
3.15 meter
72.79 ton
0.0137 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 Awal & 4 Akhir
3.00
0.30 m
0.83 -
73.94 ton
0.0135 Jam
2.50 KM / jam
1.99 M
6.00 lintasan
3.00
0.30 M
0.83 -
172.34 ton
Analisa EI-635b
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-635c
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
PROP / KAB / KODYA : ……………………………………
8.73 KM ITEM PEMBAYARAN NO. : 6.3(5c)
0.04 M JENIS PEKERJAAN : Laston Lapis Aus Perata (AC-W
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3 NO. KOMPONEN
2.32 ton / M3
1.42 ton / M3
1.57 ton / M3
0.05 km B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asp. Finisher E02
6. Tandem Roller E17
7 P. Tyre Roller E18
0.2978 M3 8 Alat Bantu
0.3523 M3
9.8700 Kg
62.8300 Kg
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
1.50 M3 panduan Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
0.85 - berat untuk bahan-bahan.
0.83 - 2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
dari nomor mata pembayaran. Harga Satuan yang dis
15.00 km/jam panduan terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
20.00 km/jam panduan 3 Biaya satuan untuk peralatan sudah termasuk bahan
0.20 menit 4 Biaya satuan sudah termasuk pengeluaran untuk selu
0.15 menit yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.75 menit
1.10 menit
104.48 ton
0.0096 Jam
Analisa EI-635c
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 Ton
0.80 -
20.00 KM / Jam
30.00 KM / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 ton
0.3698 Jam
5.00 m/menit
0.83 -
3.15 meter
72.79 ton
0.0137 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 Awal & 4 Akhir
3.00
0.83 -
0.30 M
0.00 ton
73.94
0.0135 Jam
2.50 KM / jam
1.99 M
6.00 lintasan
3.00
0.30 M
0.83 -
172.34 ton
0.0058 Jam
Berlanjut ke hal. berikut.
Analisa EI-635a
Lump Sum
49.80 M2 / Jam
348.60 M2
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-635d FORMULIR STAN
PEREKAMAN ANALISA MASING
URAIAN ANALISA HARGA SATUAN
2
A. TENAGA
39.80 % Gradasi harus -
52.06 % memenuhi -
0.93 % Spesifikasi
7.21 % 1. Pekerja (L01)
2. Mandor (L03)
2.32 ton / M3
1.42 ton / M3
1.57 ton / M3
0.05 km B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asp. Finisher E02
6. Tandem Roller E17
7 P. Tyre Roller E18
8 Alat Bantu
0.2943 M3
0.3482 M3
9.7650 Kg
74.2630 Kg
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
1.50 M3 berat untuk bahan-bahan.
0.85 - 2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
0.83 - dari nomor mata pembayaran. Harga Satuan yang dis
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
15.00 km/jam panduan 3 Biaya satuan untuk peralatan sudah termasuk bahan
20.00 km/jam panduan 4 Biaya satuan sudah termasuk pengeluaran untuk selu
0.20 menit yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.15 menit
0.75 menit
1.10 menit
Analisa EI-635b
104.48 ton
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 Ton
0.80 -
20.00 KM / Jam
30.00 KM / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 ton
0.3698 Jam
5.00 m/menit
0.83 -
3.15 meter
72.79 ton
0.0137 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 Awal & 4 Akhir
3.00
0.30 m
0.83 -
73.94 ton
0.0135 Jam
2.50 KM / jam
1.99 M
6.00 lintasan
3.00
0.30 M
0.83 -
172.34 ton
Analisa EI-635b
0.0058 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
Analisa EI-636a
8.73 KM
0.05 M NO. KOMPONEN
7.00 Jam
1.05 -
1.03 -
1.81 ton/m3 A. TENAGA
1.51 ton/m3
1. Pekerja (L01)
46.75 % Gradasi harus - 2. Mandor (L03)
46.75 % memenuhi -
0.90 % Spesifikasi
5.60 %
0.30 %As
B. BAHAN
2.32 ton / M3
1.41 ton / M3 1. Lolos screen2 ukuran ( 9.5 - 19,0)
1.57 ton / M3 2. Lolos screen2 ukuran ( 0 - 5)
0.05 km 3 Semen (M05)
4 Aspal (M10)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
6. Tandem Roller E17
7 P. Tyre Roller E18
8 Alat Bantu
104.48 ton
0.0096 Jam
Analisa EI-636a
URAIAN ANALISA HARGA SATUAN
Lanjutan
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 ton
0.80 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 ton
0.3698 Jam
5.00 m/menit
0.83 - Normal
3.15 meter
90.98 ton
0.0110 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.30 m
0.83 - Normal
92.43 ton
0.0108 Jam
2.50 KM / Jam
1.99 M
6.00 lintasan
3.00
0.30 M
0.83 -
215.43 ton
0.0046 Jam
Analisa EI-636c
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
Analisa EI-636b 2
8.73 KM
0.05 M NO. KOMPONEN
7.00 Jam
1.05 -
1.03 -
1.81 ton/m3 A. TENAGA
1.51 ton/m3
1. Pekerja (L01)
46.24 % Gradasi harus - 2. Mandor (L03)
46.24 % memenuhi -
0.89 % Spesifikasi
6.63 %
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
6. Tandem Roller E17
7 P. Tyre Roller E18
8 Alat Bantu
0.3443 M3
0.3092 M3
9.3450 Kg D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
68.2890 Kg E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
1.50 M3 dari nomor mata pembayaran. Harga Satuan yang dis
0.85 - terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
0.83 - 3 Biaya satuan untuk peralatan sudah termasuk bahan
1.10 menit 4 Biaya satuan sudah termasuk pengeluaran untuk selu
15.00 km/jam panduan yang dibayar dari kontrak) dan biaya-biaya lainnya.
20.00 km/jam panduan
0.20 menit
0.15 menit
0.75 menit
1.10 menit
104.48 ton
Berlanjut ke hal. berikut.
Analisa EI-636b
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 ton
0.80 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 ton
0.3698 Jam
5.00 m/menit
0.83 - Normal
3.15 meter
90.98 ton
0.0110 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.30 m
0.83 - Normal
92.43 ton
0.0108 Jam
2.50 KM / Jam
1.99 M
6.00 lintasan
3.00
0.30 M
0.83 -
215.43 ton
0.0046 Jam
Analisa EI-636b
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
Analisa EI-636c
PROYEK :
URAIAN ANALISA HARGA SATUAN No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
KOEF. SATUAN KETERANGAN PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 6.3(6c)
JENIS PEKERJAAN : Laston Lapis Antara Perata (AC
SATUAN PEMBAYARAN : Ton
8.73 KM NO. KOMPONEN
0.05 M
7.00 Jam
1.05 -
1.03 - A. TENAGA
1.81 ton/m3
1.51 ton/m3 1. Pekerja (L01)
2. Mandor (L03)
46.75 % Gradasi harus -
46.75 % memenuhi -
0.90 % Spesifikasi
5.60 %
0.30 %As B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
6. Tandem Roller E17
7 P. Tyre Roller E18
8 Alat Bantu
104.48 ton
0.0096 Jam
Analisa EI-636c
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 ton
0.80 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 ton
0.3698 Jam
5.00 m/menit
0.83 - Normal
3.15 meter
90.98 ton
0.0110 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.30 m
0.83 - Normal
92.43 ton
0.0108 Jam
2.50 KM / Jam
1.99 M
6.00 lintasan
3.00
0.30 M
0.83 -
215.43 ton
0.0046 Jam
Analisa EI-636c
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
Analisa EI-636d
d) Leveling 2 PROYEK :
URAIAN ANALISA HARGA SATUAN No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
KOEF. SATUAN KETERANGAN PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 6.3(6d)
JENIS PEKERJAAN : Laston Lapis Antara Modifikasi
SATUAN PEMBAYARAN : Ton
B. BAHAN
2.32 ton / M3
1.41 ton / M3 1. Lolos screen2 ukuran ( 9.5 - 19,0)
1.57 ton / M3 2. Lolos screen2 ukuran ( 0 - 5)
0.05 km 3 Filler Added (M05)
4 Aspal Modifikasi (M10)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
6. Tandem Roller E17
7 P. Tyre Roller E18
8 Alat Bantu
0.3443 M3
0.3092 M3
9.3450 Kg
68.2890 Kg D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
berat untuk bahan-bahan.
1.50 M3 2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
0.85 - dari nomor mata pembayaran. Harga Satuan yang dis
0.83 - terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
1.10 menit 3 Biaya satuan untuk peralatan sudah termasuk bahan
15.00 km/jam panduan 4 Biaya satuan sudah termasuk pengeluaran untuk selu
20.00 km/jam panduan yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.20 menit
0.15 menit
0.75 menit
1.10 menit
104.48 ton
Analisa EI-636d
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 ton
0.80 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 ton
0.3698 Jam
5.00 m/menit
0.83 - Normal
3.15 meter
90.98 ton
0.0110 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.30 m
0.83 - Normal
92.43 ton
0.0108 Jam
2.50 KM / Jam
1.99 M
6.00 lintasan
3.00
0.30 M
0.83 -
215.43 ton
0.0046 Jam
Analisa EI-636d
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
Analisa EI-637a
8.73 KM
0.06 M NO. KOMPONEN
7.00 Jam
1.05 -
1.03 -
1.81 ton/m3 A. TENAGA
1.51 ton/m3
1. Pekerja (L01)
17.80 % 2. Mandor (L03)
40.32 % Gradasi harus -
36.13 % memenuhi -
0.95 % Spesifikasi
4.80 %
0.30 %As B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
6. Tandem Roller E17
7 P. Tyre Roller E18
8 Alat Bantu
Analisa EI-637c
104.48 ton
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 ton
0.80 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 ton
0.3698 Jam
5.00 m/menit
0.83 - Normal
3.15 meter
109.18 ton
0.0092 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.30 m
0.83 - Normal
110.91 ton
0.0090 Jam
2.50 KM / Jam
1.99 M
8.00 lintasan
3.00
0.30 M
0.83 -
Analisa EI-637c
193.88 ton
0.0052 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
Analisa EI-637b
8.73 KM
0.06 M NO. KOMPONEN
7.00 Jam
1.05 -
1.03 -
1.81 ton/m3 A. TENAGA
1.51 ton/m3
1. Pekerja (L01)
17.63 % 2. Mandor (L03)
39.94 % Gradasi harus -
35.79 % memenuhi -
0.94 % Spesifikasi
5.70 %
B. BAHAN
2.32 ton / M3
1.42 ton / M3 1. Lolos screen2 ukuran ( 9.5 - 19,0)
1.42 ton / M3 2. Lolos screen2 ukuran ( 5 - 9,5)
1.57 ton / M3 3 Lolos screen2 ukuran ( 0 - 5)
0.05 km 4 Filler Added (M05)
5 Aspal Modifikasi (M10)
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
6. Tandem Roller E17
7 P. Tyre Roller E18
8 Alat Bantu
Analisa EI-637b
57.72 ton
0.0173 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 ton
0.80 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 ton
0.3698 Jam
5.00 m/menit
0.83 - Normal
3.15 meter
109.18 ton
0.0092 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.30 m
0.83 - Normal
110.91 ton
0.0090 Jam
2.50 KM / Jam
1.99 M
8.00 lintasan
3.00
0.30 M
0.83 -
Analisa EI-637b
193.88 ton
0.0052 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
Analisa EI-637c
PROYEK :
URAIAN ANALISA HARGA SATUAN No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
KOEF. SATUAN KETERANGAN PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 6.3(7c)
JENIS PEKERJAAN : Laston Lapis Pondasi Perata (A
SATUAN PEMBAYARAN : Ton
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
6. Tandem Roller E17
7 P. Tyre Roller E18
8 Alat Bantu
Analisa EI-637c
104.48 ton
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 ton
0.80 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 ton
0.3698 Jam
5.00 m/menit
0.83 - Normal
3.15 meter
109.18 ton
0.0092 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.30 m
0.83 - Normal
110.91 ton
0.0090 Jam
2.50 KM / Jam
1.99 M
8.00 lintasan
3.00
0.30 M
0.83 -
Berlanjut ke hal. berikut.
Analisa EI-637c
193.88 ton
0.0052 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
Analisa EI-637d
2 PROYEK :
URAIAN ANALISA HARGA SATUAN No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
………………………………………
KOEF. SATUAN KETERANGAN PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 6.3(7d)
JENIS PEKERJAAN : Laston Lapis Pondasi Modifika
SATUAN PEMBAYARAN : Ton
Analisa EI-637d
57.72 ton
0.0173 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 ton
0.80 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
2.70 ton
0.3698 Jam
5.00 m/menit
0.83 - Normal
3.15 meter
109.18 ton
0.0092 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.30 m
0.83 - Normal
110.91 ton
0.0090 Jam
2.50 KM / Jam
1.99 M
8.00 lintasan
3.00
0.30 M
0.83 -
Analisa EI-637d
193.88 ton
0.0052 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
19.00 MM
7.00 % A. TENAGA
0.04 M
1. Pekerja (L01)
2.19 Ton/M3 2. Mandor (L03)
1.03 Ton/M3
1.51 Ton/M3
B. BAHAN
0.50 menit
1.00 menit
0.30 menit
0.20 menit
2.00 menit referensi D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
E. OVERHEAD & PROFIT
12.000 M3 F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
berat untuk bahan-bahan.
0.0833 jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
dari nomor mata pembayaran. Harga Satuan yang dis
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
2.50 Km / Jam 3 Biaya satuan untuk peralatan sudah termasuk bahan
1.20 M 4 Biaya satuan sudah termasuk pengeluaran untuk selu
6.00 lintasan yang dibayar dari kontrak) dan biaya-biaya lainnya.
3.00
0.30 m
0.83 -
41.50 M3
0.0241 jam
Analisa EI-65
22.83 menit
26.18 menit
10.00 menit
17.45 menit
76.46 menit
0.3488 Jam
12.000 M3/Jam
84.00 M3
1.00 orang
12.00 orang
0.0833 jam
1.0000 jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
NO. KOMPONEN
8.73 KM
0.070 M
7.00 Jam
1.05 - A. TENAGA
1.03 -
1. Pekerja (L01)
133.00 Kg/M2 Tabel 6.6.3. 2. Mandor (L03)
25.00 Kg/M2 Tabel 6.6.3.
14.00 Kg/M2 Tabel 6.6.3.
5.20 Kg/M2 Tabel 6.6.3.
1.50 Kg/M2 Tabel 6.6.3.
95.71 Kg/M3 B. BAHAN
C. PERALATAN
141.10 M3
0.0071 Jam
Analisa EI-661
10.00 ton
0.80 -
20.00 KM / Jam
30.00 KM / Jam
2.99 menit
26.18 menit
15.00 menit
17.45 menit
61.62 menit
5.49 M3
0.1823 Jam
2.50 Km / Jam
1.90 M
12.00 lintasan 2 fase @ 6 lintas
1.00
0.30 M
0.83 -
22.9979166667 M3
0.0000
0.0435 Jam
850.00 liter
0.80 -
55 liter/menit
2.64 liter
0.3788 Jam
Lump Sum
141.10 M3/Jam
987.70 M3
20.00 orang
2.00 orang
0.1417 Jam
0.0142 Jam
Analisa EI-661
URAIAN ANALISA HARGA SATUAN
Lanjutan
NO. KOMPONEN
8.73 KM
0.075 M
7.00 Jam
1.05 - A. TENAGA
1.03 -
1. Pekerja (L01)
180.00 Kg/M2 Tabel 6.6.4. 2. Mandor (L03)
25.00 Kg/M2 Tabel 6.6.4.
7.50 Kg/M2 Tabel 6.6.4.
100.00 Kg/M3
C. PERALATAN
1.7746 M3
0.2465 M3
103.00 Kg
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
1.50 M3 Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
0.85 - berat untuk bahan-bahan.
0.83 - 2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
0.45 lihat tabel dari nomor mata pembayaran. Harga Satuan yang dis
V - Loading terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
141.10 M3 3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk selu
yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.0071 Jam
10.00 ton
0.80 -
20.00 KM / Jam
30.00 KM / Jam
2.99 menit
26.18 menit
15.00 menit
17.45 menit
61.62 menit
5.49 M3
0.1823 Jam
2.50 Km / Jam
1.90 M
12.00 lintasan 2 fase @ 6 lintas
1.00
0.30 M
0.83 -
24.640625 M3
0.0406 Jam
850.00 liter
0.80 -
55 liter/penit
2.64 liter
0.3788 Jam
Lump Sum
141.10 M3/Jam
987.70 M3
20.00 orang
2.00 orang
0.1417 Jam
0.0142 Jam
Berlanjut ke halaman berikut
Analisa EI-662
B. BAHAN
1.0403 Kg.
3.00 M
30.00 m/menit Asumsi Panduan D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
100 liter/menit Sedang E. OVERHEAD & PROFIT
0.80 F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
4,800.00 liter berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
0.0002 Jam dari nomor mata pembayaran. Harga Satuan yang dis
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk selu
4,800.00 liter yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.0002 Jam
4,800.00 liter
33,600.00 liter
10.00 orang
2.00 orang
Analisa EI-611a
0.0021 Jam
0.0004 Jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
B. BAHAN
C. PERALATAN
0.5202 Kg.
1.0000 liter
3.00 M
30.00 m/menit Asumsi D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
100 liter/menit Panduan E. OVERHEAD & PROFIT
0.80 Sedang F. HARGA SATUAN PEKERJAAN ( D + E )
4,800.00 liter Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
0.0002 Jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
dari nomor mata pembayaran. Harga Satuan yang dis
4,800.00 liter terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
0.0002 Jam 3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk selu
yang dibayar dari kontrak) dan biaya-biaya lainnya.
1,000 liter
0.80 -
8.00 menit
5.00 menit
4.00 menit
3.00 menit
20.00 menit referensi
40.000 liter
0.0250 jam
Analisa EI-611a
4,800.00 liter
33,600.00 liter
10.00 orang
2.00 orang
0.0021 Jam
0.0004 Jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
B. BAHAN
C. PERALATAN
1.0216 Kg.
0.018 Kg
3.00 M
30.00 m/menit Asumsi D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
100 liter/menit Panduan E. OVERHEAD & PROFIT
0.80 Sedang F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
4,800.00 liter berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
0.0002 Jam dari nomor mata pembayaran. Harga Satuan yang dis
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk selu
4,800.00 liter yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.0002 Jam
4,800.00 liter
33,600.00 liter
10.00 orang
2.00 orang
Analisa EI-611a
0.0021 Jam
0.0004 Jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
92.00 % A. TENAGA
8.00 %As sesuai Spek.5-11%
1. Pekerja (L01)
1.03 Kg / Ltr 2. Mandor (L03)
0.80 Kg / liter
B. BAHAN
1. Aspal (M10)
2 Kerosene (M11)
C. PERALATAN
0.976 Kg
0.066 liter
3.00 M
0.80 - D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
100 liter/menit E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
4,800.00 liter berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
0.0002 Jam dari nomor mata pembayaran. Harga Satuan yang dis
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk selu
yang dibayar dari kontrak) dan biaya-biaya lainnya.
4,800.00 liter
0.0002 Jam
#REF!
4,800.00 liter
33,600.00 liter
10.00 orang
2.00 orang
0.0021 Jam
0.0004 Jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
94.00 % A. TENAGA
6.00 %As
1. Pekerja (L01)
1.02 Kg / Ltr 2. Mandor (L03)
0.80 Kg / liter
B. BAHAN
2 Kerosene (M11)
C. PERALATAN
0.988 Kg
0.049 liter
3.00 M
0.80 - D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
100 liter/menit E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
4,800.00 liter berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
0.0002 Jam dari nomor mata pembayaran. Harga Satuan yang dis
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk selu
yang dibayar dari kontrak) dan biaya-biaya lainnya.
4,800.00 liter
0.0002 Jam
#REF!
4,800.00 liter
33,600.00 liter
10.00 orang
2.00 orang
0.0021 Jam
0.0004 Jam
FORMULIR STAN
PEREKAMAN ANALISA MASING
92 % A. TENAGA
8.00 %As
1. Pekerja (L01)
1.03 Kg / liter 2. Mandor (L03)
0.80 Kg / liter
B. BAHAN
1. Aspal (M10)
2. Kerosene (M11)
C. PERALATAN
1.03 liter
0.976 Kg
0.066 liter
600.00 Liter
0.80 - D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
E. OVERHEAD & PROFIT
10.00 menit F. HARGA SATUAN PEKERJAAN ( D + E )
8.00 menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
5.00 menit berat untuk bahan-bahan.
5.00 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
28.00 menit dari nomor mata pembayaran. Harga Satuan yang dis
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
1,028.571 Liter 3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk selu
0.0010 jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
10.00 liter
70.00 liter
10.00 orang
2.00 orang
1.0000 Jam
0.2000 Jam
Analisa EI-612a
94 % A. TENAGA
6.00 %Ae
1. Pekerja (L01)
1.01 Kg / liter 2. Mandor (L03)
0.80 Kg / liter
B. BAHAN
1. Aspal Emulsi (M31)
2 Kerosene (M11)
C. PERALATAN
1.03 liter
0.978 Kg
0.049 liter
600.00 Liter
0.80 - Asumsi D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
Panduan E. OVERHEAD & PROFIT
10.00 menit Sedang F. HARGA SATUAN PEKERJAAN ( D + E )
8.00 menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
5.00 menit berat untuk bahan-bahan.
5.00 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
28.00 menit dari nomor mata pembayaran. Harga Satuan yang dis
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
1,028.571 Liter 3 Biaya satuan untuk peralatan sudah termasuk bahan
4 Biaya satuan sudah termasuk pengeluaran untuk selu
0.0010 jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
5.00 liter
35.00 liter
10.00 orang
2.00 orang
Analisa EI-611a
92 % A. TENAGA
6.00 %Ae Harus sesuai
2.00 %Ae spesifikasi 1. Pekerja (L01)
2. Mandor (L03)
1.01 Kg / liter
0.80 Kg / liter
B. BAHAN
C. PERALATAN
1.03 liter
0.957 Kg
0.062 liter
0.019 Kg
600.00 Liter D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATA
0.80 - Asumsi E. OVERHEAD & PROFIT
Panduan F. HARGA SATUAN PEKERJAAN ( D + E )
10.00 menit Sedang Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk T
8.00 menit berat untuk bahan-bahan.
5.00 menit 2 Kuantitas satuan adalah kuantitas perkiraan setiap ko
5.00 menit dari nomor mata pembayaran. Harga Satuan yang dis
28.00 menit terdapat Penyesuaian Harga (Eskalasi/Deskalasi) ses
3 Biaya satuan untuk peralatan sudah termasuk bahan
1,028.571 Liter 4 Biaya satuan sudah termasuk pengeluaran untuk selu
yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.0010 jam
5.00 liter
35.00 liter
10.00 orang
2.00 orang
Analisa EI-611a
2.0000 Jam
0.4000 Jam
Analisa EI-611a
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Resap Pengikat - Aspal Cair TOTAL HARGA (Rp.) : 5,772.87
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Perekat - Aspal Cair TOTAL HARGA (Rp.) : 6,709.48
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Agregat Penutup BURTU TOTAL HARGA (Rp.) : 7,756.11
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Agregat Penutup BURDA TOTAL HARGA (Rp.) : 12,407.63
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Latasir Kelas A (SS-A) TOTAL HARGA (Rp.) : 944,157.22
% THD. BIAYA PROYEK : 0.06
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Latasir Kelas B (SS-B) TOTAL HARGA (Rp.) : 815,710.13
% THD. BIAYA PROYEK : 0.05
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lataston Lapis Aus (HRS-WC) (gradasi TOTAL HARGA (Rp.) : 822,043.88
% THD. BIAYA PROYEK : 0.05
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lataston Lapis Aus Perata (HRS-WC(L))TOTAL HARGA (Rp.) : 822,043.88
% THD. BIAYA PROYEK : 0.05
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lataston Lapis Pondasi (HRS-Base) (gr TOTAL HARGA (Rp.) : 720,809.64
% THD. BIAYA PROYEK : 0.04
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lataston Lapis Pondasi Perata (HRS-Bas
TOTAL HARGA (Rp.) : 720,809.64
% THD. BIAYA PROYEK : 0.04
PERKIRAAN HARGA JUMLAH
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Aus Modifikasi (AC-WC MoTOTAL HARGA (Rp.) : 872,371.99
% THD. BIAYA PROYEK : 0.05
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Aus Perata (AC-WC(L)) TOTAL HARGA (Rp.) : 747,415.11
% THD. BIAYA PROYEK : 0.05
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Aus Modifikasi Perata (A TOTAL HARGA (Rp.) : 966,748.98
% THD. BIAYA PROYEK : 0.06
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Antara (AC-BC) TOTAL HARGA (Rp.) : 709,617.35
% THD. BIAYA PROYEK : 0.04
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Antara Modifikasi (AC-BC TOTAL HARGA (Rp.) : 911,989.31
% THD. BIAYA PROYEK : 0.06
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Antara Perata (AC-BC(L)) TOTAL HARGA (Rp.) : 709,617.35
% THD. BIAYA PROYEK : 0.04
PERKIRAAN HARGA JUMLAH
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Antara Modifikasi Perata TOTAL HARGA (Rp.) : 911,989.31
% THD. BIAYA PROYEK : 0.06
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Pondasi (AC-Base) TOTAL HARGA (Rp.) : 648,172.52
% THD. BIAYA PROYEK : 0.04
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Pondasi Modifikasi (AC-B TOTAL HARGA (Rp.) : 825,582.08
% THD. BIAYA PROYEK : 0.05
rkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Pondasi Perata (AC-Base(LTOTAL HARGA (Rp.) : 648,172.52
% THD. BIAYA PROYEK : 0.04
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Pondasi Modifikasi Perat TOTAL HARGA (Rp.) : 825,582.08
% THD. BIAYA PROYEK : 0.05
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Campuran Aspal Dingin untuk PelapisanTOTAL HARGA : 1,244,344.87
% THD. BIAYA PROYEK : 0.08
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Permukaan Penetrasi Macadam TOTAL HARGA : 1,107,484.67
% THD. BIAYA PROYEK : 0.07
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Pondasi/Perata Penetrasi Macad TOTAL HARGA : 1,176,454.94
% THD. BIAYA PROYEK : 0.07
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Resap Pengikat - Aspal Emulsi TOTAL HARGA (Rp.) : 6,053.74
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Perekat - Aspal Emulsi TOTAL HARGA (Rp.) : 3,467.28
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Lapis Perekat - Aspal Emulsi Modifikasi TOTAL HARGA (Rp.) : 5,967.01
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Bahan Aspal untuk Pekerjaan PelaburanTOTAL HARGA (Rp.) : 7,380.67
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Bahan Aspal Modifikasi untuk PekerjaanTOTAL HARGA (Rp.) : 165.83
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Aspal Cair Emulsi untuk Precoated TOTAL HARGA (Rp.) : 14,584.43
% THD. BIAYA PROYEK : 0.00
PERKIRAAN HARGA JUMLAH
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Aspal Emulsi untuk Precoated TOTAL HARGA (Rp.) : 20,023.02
% THD. BIAYA PROYEK : 0.00
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Aspal Emulsi Modifikasi untuk PrecoatedTOTAL HARGA (Rp.) : 19,903.15
% THD. BIAYA PROYEK : 0.00
"Aspal modifikasi Asbuton yg diproses" terbuat dari 80% aspal keras + 20% asbuton
Asbuton terdiri dari 30% bitumen + 70% mineral asbuton
Komposisi Aspal modifikasi Asbuton yg diproses : 80 + (20 x 30%) = 86% bitumen + (20 x 70%) = 14 % minera
Contoh kadar aspal JMF untuk Pen.60/70 = 6.1%, untuk Aspal Modifikasi naik sekitar 0,1% (karena lebih kental),
"Aspal modifikasi Asbuton yang diproses" yang diperlukan : 6.2/0.86 = 7.325581 % (bitumen + mineral d
(patokannya 6,2% bukan 6,1% karena keduanya adalah Aspa
Filler added masih diperlukan karena konstribusi mineral asbuton sebagai filler masih rendah (lolos #100 >= 95
Asp Pen.60/70 Asp Mod Asp Mod
Asb yg diproses 0.00 Polimer Asb yg diproses
Agr+Filler 40.24 40.20 39.76
92.67 52.62 52.56 51.99
0.94 0.94 0.93
6.20 6.30 7.33
100.00 100.00 100.01
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Kadar Semen Minimum Ks 450
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00
- Mengaduk T2 1.00
- Menuang T3 0.50
- Tunggu, dll. T4 0.50
Ts 3.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72
Kebutuhan tenaga : - Mandor M 1.00
- Tukang : Tb 18.00
Tk batu = 4
Tk Kayu = 14
- Pekerja P 8.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004
- Tukang = (Tk x Tb) : Qt (L02) 1.8072
- Pekerja = (Tk x P) : Qt (L01) 0.8032
Rp. 1,385,837.81 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Kadar Semen Minimum Ks 400
7 Ukuran Agregat Maksimum Ag 19
8 Perbandingan Air/Semen Maksimum Wcr 0.45
9 Perbandingan Camp. : Semen Sm 478.0
: Pasir Ps 622.0
: Agregat Kasar Kr 992.0
10 Berat Isi :
- Beton D1 2.40
- Semen D2 1.25
- Pasir D3 1.30
- Agregat Kasar D4 1.40
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00
- Mengaduk T2 1.00
- Menuang T3 0.50
- Tunggu, dll. T4 0.50
Ts 3.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004
- Tukang = (Tk x Tb) : Qt (L02) 1.8072
- Pekerja = (Tk x P) : Qt (L01) 0.8032
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Kadar Semen Minimum Ks 365
7 Ukuran Agregat Maksimum Ag 19
8 Perbandingan Air/Semen Maksimum Wcr 0.45
9 Perbandingan Camp. : Semen Sm 456.0
: Pasir Ps 637.0
: Agregat Kasar Kr 992.0
10 Berat Isi :
- Beton D1 2.40
- Semen D2 1.25
- Pasir D3 1.30
- Agregat Kasar D4 1.40
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 469.680
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5145
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.4000
1.e. Paku (M18) 3.2000
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00
- Mengaduk T2 1.00
- Menuang T3 0.50
- Tunggu, dll. T4 0.50
Ts 3.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004
- Tukang = (Tk x Tb) : Qt (L02) 1.8072
- Pekerja = (Tk x P) : Qt (L01) 0.8032
Rp. 1,282,674.47 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Kadar Semen Minimum Ks 350
7 Ukuran Agregat Maksimum Ag 19
8 Perbandingan Air/Semen Maksimum Wcr 0.45
9 Perbandingan Camp. : Semen Sm 456.0
: Pasir Ps 631.0
: Agregat Kasar Kr 992.0
10 Berat Isi :
- Beton D1 2.40
- Semen D2 1.25
- Pasir D3 1.30
- Agregat Kasar D4 1.40
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 469.680
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5097
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.2000
1.e. Paku (M18) 1.6000
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00
- Mengaduk T2 1.00
- Menuang T3 0.50
- Tunggu, dll. T4 0.50
Ts 3.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004
- Tukang = (Tk x Tb) : Qt (L02) 1.1044
- Pekerja = (Tk x P) : Qt (L01) 0.8032
Rp. 979,741.15 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Kadar Semen Minimum Ks 340
7 Ukuran Agregat Maksimum Ag 19
8 Perbandingan Air/Semen Maksimum Wcr 0.50
9 Perbandingan Camp. : Semen Sm 410.0
: Pasir Ps 670.0
: Agregat Kasar Kr 992.0
10 Berat Isi :
- Beton D1 2.40
- Semen D2 1.25
- Pasir D3 1.30
- Agregat Kasar D4 1.40
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 422.300
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5412
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.2000
1.e. Paku (M18) 1.6000
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00
- Mengaduk T2 1.00
- Menuang T3 0.50
- Tunggu, dll. T4 0.50
Ts 3.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004
- Tukang = (Tk x Tb) : Qt (L02) 1.1044
- Pekerja = (Tk x P) : Qt (L01) 0.8032
Rp. 944,768.57 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Kadar Semen Minimum Ks 300
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 327.540
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5024
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.9053
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.1000
1.e. Paku (M18) 0.8000
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00
- Mengaduk T2 4.00
- Menuang T3 2.00
- Tunggu, dll. T4 3.00
Ts 17.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827
- Tukang = (Tk x Tb) : Qt (L02) 1.3655
- Pekerja = (Tk x P) : Qt (L01) 1.3655
Rp. 657,219.7 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Kadar Semen Minimum Ks 300
1. BAHAN
1.a. Semen (PC) = Sm x 0.7 x 1.03 (M12) 229.278
1.b. Pasir Beton = (Ps/1000 : D3) x 0.7 x 1.05 (M01) 0.3517
1.c. Agregat Kasar = (Kr/1000 : D4) x 0.7 x 1.05 (M03) 0.6337
1.d. Batu Belah = {(Kr/1000 x D1) : D4} x 0.30 * 1.05 (M06) 0.6518
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00
- Mengaduk T2 4.00
- Menuang T3 2.00
- Tunggu, dll. T4 3.00
Ts 17.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827
- Tukang = (Tk x Tb) : Qt (L02) 0.6827
- Pekerja = (Tk x P) : Qt (L01) 8.1928
Rp. 517,140.6 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Kadar Semen Minimum Ks 250
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 311.060
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5113
1.c. Kerikil Pecah = (Kr/1000 : D4) x 1.05 (M03) 0.9053
1.e. Kayu Perancah (M19) 0.0500
1.f Paku (M18) 0.4000
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00
- Mengaduk T2 4.00
- Menuang T3 2.00
- Tunggu, dll. T4 3.00
Ts 17.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827
- Tukang = (Tk x Tb) : Qt (L02) 1.3655
- Pekerja = (Tk x P) : Qt (L01) 1.3655
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Rp. 570,482.6 / M3
2. ALAT
3. TENAGA
ITEM PEMBAYARAN NO. : 7.2 (1a)
JENIS PEKERJAAN : Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter
SATUAN PEMBAYARAN : Buah URAIAN AN
I. ASUMSI
1 Material merupakan bahan jadi (pabrikasi)
2 Diterimq di lokasi pekerjaan
2. ALAT
3. TENAGA
I. ASUMSI
1 Material merupakan bahan jadi (pabrikasi)
2 Diterimq di lokasi pekerjaan
2. ALAT
3. TENAGA
I. ASUMSI
1 PC I Girder dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00
3 Tinggi PC I Girder H 0.90
4 Bentang PC I Girder L 15.60
5 Menggunakan beton K500
6 Komponen baja tulangan 250
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00
Faktor Efisiensi alat Fa 0.83
Waktu siklus
- Waktu memuat dan membongkar T1 30.00
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00
Ts2 45.00
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 7.00
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00
- Tukang Tb 5.00
- Pekerja P 18.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.00
- Tukang = (Tk x Tb) : Qt (L02) 5.00
- Pekerja = (Tk x P) : Qt (L01) 18.00
I. ASUMSI
1 PC I Girder dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00
3 Tinggi PC I Girder H 1.25
4 Bentang PC I Girder L 24.60
5 Menggunakan beton K500
6 Komponen baja tulangan 250
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00
Faktor Efisiensi alat Fa 0.83
Waktu siklus
- Waktu memuat dan membongkar T1 30.00
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00
Ts2 45.00
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 7.00
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00
- Tukang Tb 5.00
- Pekerja P 18.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.00
- Tukang = (Tk x Tb) : Qt (L02) 5.00
- Pekerja = (Tk x P) : Qt (L01) 18.00
I. ASUMSI
1 PC I Girder dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00
3 Tinggi PC I Girder H 1.60
4 Bentang PC I Girder L ??
5 Menggunakan beton K500
6 Komponen baja tulangan 250
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00
Faktor Efisiensi alat Fa 0.83
Waktu siklus
- Waktu memuat dan membongkar T1 30.00
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00
Ts2 45.00
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 7.00
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00
- Tukang Tb 5.00
- Pekerja P 18.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.00
- Tukang = (Tk x Tb) : Qt (L02) 5.00
- Pekerja = (Tk x P) : Qt (L01) 18.00
I. ASUMSI
1 Material merupakan bahan jadi (pabrikasi)
2 Diterimq di lokasi pekerjaan
2. ALAT
3. TENAGA
I. ASUMSI
1 Material merupakan bahan jadi (pabrikasi)
2 Diterimq di lokasi pekerjaan
2. ALAT
3. TENAGA
I. ASUMSI
1 PC I Girder dicetak di pabrik
2 Jam kerja efektif per-hari Tk 7.00
3 Tinggi PC I Girder H 0.90
4 Bentang PC I Girder L 15.60
5 Menggunakan beton K500
6 Komponen baja tulangan 250
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00
Faktor Efisiensi alat Fa 0.83
Waktu siklus
- Waktu memuat dan membongkar T1 30.00
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00
Ts2 45.00
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 7.00
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00
- Tukang Tb 5.00
- Pekerja P 18.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.00
- Tukang = (Tk x Tb) : Qt (L02) 5.00
- Pekerja = (Tk x P) : Qt (L01) 18.00
I. ASUMSI
1 PC I Girder dicetak di Pabrik
2 Jam kerja efektif per-hari Tk 7.00
3 Tinggi PC I Girder H 1.60
4 Bentang PC I Girder L ??
5 Menggunakan beton K500
6 Komponen baja tulangan 250
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00
Faktor Efisiensi alat Fa 0.83
Waktu siklus
- Waktu memuat dan membongkar T1 30.00
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00
Ts2 45.00
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 7.00
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00
- Tukang Tb 5.00
- Pekerja P 18.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.00
- Tukang = (Tk x Tb) : Qt (L02) 5.00
- Pekerja = (Tk x P) : Qt (L01) 18.00
I. ASUMSI
1 Kabel Prategang dan diterima di lokasi pek.
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan Lp 8.73
4 Jam kerja efektif per-hari Tk 7.00
1. BAHAN
Kabel Prategang 1.0
2. ALAT
2.a DUMP TRUCK (E08)
Kapasitas bak sekali muat V 10.00
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 26.18
- Waktu tempuh kosong = (L : v2) x 60 T2 17.45
- Lain-lain (bongkar dan muat) T3 45.00
Ts1 88.63
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk Qt 23.24
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00
- Tukang Tb 1.00
- Pekerja P 10.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.3012
- Tukang = (Tk x Tb) : Qt (L02) 0.3012
- Pekerja = (Tk x P) : Qt (L01) 3.0120
Rp. 109,474 / Kg
I. ASUMSI
1 Pracetak Voided Slab dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00
3 Tinggi Pracetak Voided Slab H 0.30
4 Bentang Pracetak Voided Slab P 5.80
5 Pengadaan Beton K400 sudah termasuk mobilisasinya
6 Komponen baja tulangan Bj1 140.00
7 Faktor kehilangan bahan (beton, kabel dan grouting) Fh1 1.10
8 Faktor kehilangan bahan (Selongsong) Fh2 1.02
9 BJ bahan grouting 1,200.00
10 Jarak rata-rata Base camp ke lokasi pekerjaan L 10.00
11 Luas potongan melintang As 0.21
h Bahan Curing
= ((As=0,21)x2)+((P=5,80)x(H=0,30)x2) (M05) 3.91
2. ALAT
2.a Crane (E31)
Kapasitas V1 1.00
Faktor Efisiensi alat Fa 0.83
Waktu siklus
- Waktu memuat dan membongkar T1 30.00
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00
Ts1 45.00
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 7.00
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00
- Tukang Tb 5.00
- Pekerja P 12.00
I. ASUMSI
1 Pracetak Flat Slab dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00
3 Tinggi Pracetak Flat Slab H 0.30
4 Bentang Pracetak Flat Slab P 5.80
5 Pengadaan Beton K400 sudah termasuk mobilisasinya
6 Komponen baja tulangan Bj1 140.00
7 Faktor kehilangan bahan (beton, kabel dan grouting) Fh1 1.10
8 Faktor kehilangan bahan (Selongsong) Fh2 1.02
9 BJ bahan grouting 1,200.00
10 Jarak rata-rata Base camp ke lokasi pekerjaan L 10.00
11 Luas potongan melintang As 0.36
h Bahan Curing
= ((As=0,36)x2)+((P=5,80)x(H=0,30)x2) (M05) 4.19
2. ALAT
2.a Crane (E31)
Kapasitas V1 1.00
Faktor Efisiensi alat Fa 0.83
Waktu siklus
- Waktu memuat dan membongkar T1 30.00
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00
Ts1 45.00
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 7.00
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00
- Tukang Tb 5.00
- Pekerja P 12.00
I. ASUMSI
1 PC Diafragma dicetak di lokasi proyek K 350
2 Lokasi pekerjaan : di setiap jembatan
3 Bahan diterima di lokasi jembatan
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan 1.1 1.10
6 Ukuran 0.9 x 1.17 x 0.15 0.1580
7 tulangan 200
1. BAHAN
- Pracetak PC Diafragma bentang K 350 0.1580
- tulangan 31.5900
2.
ALAT
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk Qt 7.75
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00
- Tukang Tb 1.00
- Pekerja P 10.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.9036
- Tukang = (Tk x Tb) : Qt (L02) 0.9036
- Pekerja = (Tk x P) : Qt (L01) 9.0361
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor Kehilangan Besi Tulangan Fh 1.10
1. BAHAN
1.a. Baja Tulangan (Polos) U24 (M39a) 1.1000
1.b. Kawat beton (M14) 0.0025
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00
dibutuhkan tenaga : - Mandor M 1.00
- Tukang Tb 1.00
- Pekerja P 3.00
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050
Rp. 11,870.26 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor Kehilangan Besi Tulangan Fh 1.10
1. BAHAN
1.a. Baja Tulangan (Polos) U32 (M57a) 1.1000
1.b. Kawat beton (M14) 0.0200
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00
dibutuhkan tenaga : - Mandor M 1.00
- Tukang Tb 1.00
- Pekerja P 3.00
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Rp. 11,864.51 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor Kehilangan Besi Tulangan Fh 1.10
1. BAHAN
1.a. Baja Tulangan (Ulir) D32 (M39b) 1.1000
1.b. Kawat beton (M14) 0.0200
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00
dibutuhkan tenaga : - Mandor M 1.00
- Tukang Tb 1.00
- Pekerja P 3.00
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050
Rp. 12,623.51 / Kg
1. BAHAN
1.a. Baja Tulangan (Ulir) D39 (M57b) 1.0500
1.b. Kawat beton (M14) 0.0200
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00
dibutuhkan tenaga : - Mandor M 1.00
- Tukang Tb 1.00
- Pekerja P 3.00
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050
Rp. 11,441.88 / Kg
6. MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : . . . . . . . . . . . . bulan
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor Kehilangan Besi Tulangan Fh 1.10
1. BAHAN
1.a. Baja Tulangan (Ulir) D48 (M57c) 1.1000
1.b. Kawat beton (M14) 0.0200
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00
dibutuhkan tenaga : - Mandor M 1.00
- Tukang Tb 1.00
- Pekerja P 3.00
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050
Rp. 12,623.51 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi Jembatan
3 Bahan dasar (besi) dan kawat las diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor Kehilangan Besi Tulangan Fh 1.10
1. BAHAN
1.a. Baja Tulangan (M57c) 1.1000
1.b. Kawat Las (M14) 0.0200
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00
dibutuhkan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 6.00
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0700
- Pekerja = ( P x Tk ) : Qt (L01) 0.2100
Rp. 42,042.94 / Kg
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan Lp 8.73
4 Jam kerja efektif per-hari Tk 7.00
5 Jarak pabrik ke Lokasi Jembatan Ld2 30.00
6 Berat Rangka Baja per komponen Bg 1,200.00
A. PENGADAAN
1. BAHAN
Baja Struktur BJ 34 (Titik Leleh 210 MPa) 1.0000
2. ALAT
2.a TRONTON (E35)
Kapasitas bak sekali muat V 15,000.00
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus : Ts1
- Waktu tempuh isi = (Ld2 : v1 ) x 60 T1 90.00
- Waktu tempuh kosong = (Ld2 : v2) x 60 T2 60.00
- Lain-lain (bongkar dan muat) T3 180.00
Ts1 330.00
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk Qt 69,720.00
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00
- Tukang Tb 1.00
- Pekerja P 10.00
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt (L03) 0.0001
- Tukang = (Tk x Tb) : Qt (L02) 0.0001
- Pekerja = (Tk x P) : Qt (L01) 0.0010
Rp. 12,801.3 / Kg
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan Lp 8.73
4 Jam kerja efektif per-hari Tk 7.00
5 Jarak pabrik ke Lokasi Jembatan Ld2 30.00
6 Berat Rangka Baja per komponen Bg 1,200.00
A. PENGADAAN
1. BAHAN
Sudah ada
2. ALAT
2.b. Crane on Track 35 Ton (E31)
Kapasitas V2 1.00
Faktor Efisiensi alat Fa 0.83
Waktu siklus
- Waktu penggeseran T1 20.00
- Waktu Erection T2 30.00
- Waktu lain-lain ( perkuatan rangka ) T3 10.00
Ts1 60.00
3. TENAGA
Produksi Rangka baja (Prod. Crane menentukan) Qt 6,972.0
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00
- Tukang T 5.00
- Pekerja P 20.00
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0010
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0050
- Pekerja = ( P x Tk ) : Qt (L01) 0.0201
Rp. 396.1 / Kg
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan Lp 8.73
4 Jam kerja efektif per-hari Tk 7.00
5 Jarak pabrik ke Lokasi Jembatan Ld2 30.00
6 Berat Rangka Baja per komponen Bg 1,200.00
A. PENGADAAN
1. BAHAN
Baja Struktur BJ 37 (Titik Leleh 240 MPa) 1.0000
2. ALAT
2.a TRONTON (E35)
Kapasitas bak sekali muat V 15,000.00
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus : Ts1
- Waktu tempuh isi = (Ld2 : v1 ) x 60 T1 90.00
- Waktu tempuh kosong = (Ld2 : v2) x 60 T2 60.00
- Lain-lain (bongkar dan muat) T3 180.00
Ts1 330.00
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk Qt 69,720.00
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00
- Tukang Tb 1.00
- Pekerja P 10.00
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt (L03) 0.0001
- Tukang = (Tk x Tb) : Qt (L02) 0.0001
- Pekerja = (Tk x P) : Qt (L01) 0.0010
Rp. 12,801.3 / Kg
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan Lp 8.73
4 Jam kerja efektif per-hari Tk 7.00
5 Jarak pabrik ke Lokasi Jembatan Ld2 30.00
6 Berat Rangka Baja per komponen Bg 1,200.00
A. PENGADAAN
1. BAHAN
Sudah ada
2. ALAT
2.b. Crane on Track 35 Ton (E31)
Kapasitas V2 1.00
Faktor Efisiensi alat Fa 0.83
Waktu siklus
- Waktu penggeseran T1 20.00
- Waktu Erection T2 30.00
- Waktu lain-lain ( perkuatan rangka ) T3 10.00
Ts1 60.00
3. TENAGA
Produksi Rangka baja (Prod. Crane menentukan) Qt 6,972.0
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00
- Tukang T 5.00
- Pekerja P 20.00
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0010
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0050
- Pekerja = ( P x Tk ) : Qt (L01) 0.0201
Rp. 396.1 / Kg
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan Lp 8.73
4 Jam kerja efektif per-hari Tk 7.00
5 Jarak pabrik ke Lokasi Jembatan Ld2 30.00
6 Berat Rangka Baja per komponen Bg 1,200.00
II. URUTAN KERJA
1 Baja disiapkan oleh pabrik dan dimuat
ke Tronton dengan biaya atas tanggungan pabrik
2 Mengangkut ke lokasi Jembatan dengan biaya
atas tanggungan Kontraktor
3 Menurunkan dari tronton menggunakan Crane dengan
biaya atas tanggungan Kontraktor
A. PENGADAAN
1. BAHAN
Baja Struktur BJ ……. (Titik Leleh …... MPa) 1.0000
2. ALAT
2.a TRONTON (E35)
Kapasitas bak sekali muat V 15,000.00
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus : Ts1
- Waktu tempuh isi = (Ld2 : v1 ) x 60 T1 90.00
- Waktu tempuh kosong = (Ld2 : v2) x 60 T2 60.00
- Lain-lain (bongkar dan muat) T3 180.00
Ts1 330.00
3. TENAGA
Produksi per hari (unloading) = Q2 x Tk Qt 69,720.00
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00
- Tukang Tb 1.00
- Pekerja P 10.00
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt (L03) 0.0001
- Tukang = (Tk x Tb) : Qt (L02) 0.0001
- Pekerja = (Tk x P) : Qt (L01) 0.0010
Rp. 151.3 / Kg
I. ASUMSI
1 Membeli Komponen Baja Struktur dari Pabrik
(telah di coating)
2 Lokasi pekerjaan : di setiap jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan Lp 8.73
4 Jam kerja efektif per-hari Tk 7.00
5 Jarak pabrik ke Lokasi Jembatan Ld2 30.00
6 Berat Rangka Baja per komponen Bg 1,200.00
A. PENGADAAN
1. BAHAN
Sudah ada
2. ALAT
2.b. Crane on Track 35 Ton (E31)
Kapasitas V2 1.00
Faktor Efisiensi alat Fa 0.83
Waktu siklus
- Waktu penggeseran T1 20.00
- Waktu Erection T2 30.00
- Waktu lain-lain ( perkuatan rangka ) T3 10.00
Ts1 60.00
3. TENAGA
Produksi Rangka baja (Prod. Crane menentukan) Qt 6,972.0
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00
- Tukang T 5.00
- Pekerja P 20.00
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0010
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0050
- Pekerja = ( P x Tk ) : Qt (L01) 0.0201
Rp. 396.1 / Kg
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Material rangka baja di lokasi
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
4 Jam kerja efektif per-hari Tk 7.00
5 Berat Rangka Baja Span 60 M (Class B) Br 130,000
6 Untuk perletakan sementara : perancah kayu
7 Berat rangka baja per komponen Bg 1,500
1. BAHAN
Kayu Perancah 20.00 M3/rangka baja M19 0.0002
2. ALAT
2.a. Crane on Track 35 Ton (E31)
Kapasitas V2 1.00
Faktor Efisiensi alat Fa 0.83
Waktu siklus
- Waktu penggeseran T1 20
- Waktu Erection T2 30
- Waktu lain-lain ( perkuatan rangka ) T3 10
Ts1 60.00
3. TENAGA
Produksi Rangka baja (Prod. Crane menentukan) = Tk x Q1 Qt 8,715.0
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1
- Tukang T 5
- Pekerja P 20
Koefisien Tenaga / Kg :
- Mandor = (Tk x M) : Qt (L03) 0.0008
- Tukang = (Tk x T ) : Qt (L02) 0.0040
- Pekerja = (Tk x P ) : Qt (L01) 0.0161
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
I. ASUMSI
1 Pengangkutan Material dari Pabrik ke Pelabuhan (1)
dengan Trailer
2 Pengangkutan dari Pelabuhan (1) ke Pelabuhan (2)
dengan Kapal Laut
3 Jarak Pabrik ke Pelabuhan (1) Ld1 25.0
4 Jarak dari Pelabuhan (1) ke Pelabuhan (2) Lp 100.0
5 Jarak dari Pelabuhan (2) ke Lokasi Pekerjaan Ld2 25.0
1. BAHAN
Tidak ada pemakaian bahan
2. ALAT
Pengangkutan dari pabrik ke Pelabuhan 1
TRAILER ke 1 (E35)
Kapasitas angkut V1 20.00
Faktor Efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu Siklus : Ts2
- Waktu tempuh isi = (Ld1 : v1) x 60 menit T1 75.00
- Waktu tempuh kosong = (Ld1 : v2) x 60 menit T2 50.00
- Waktu bongkar, muat dan lain-lain T3 180.00
Ts1 305.00
TENAGA
Diperlukan untuk menurunkan material di pelabuhan/hari Qt1 22,859
Kebutuhan tenaga : - Mandor M 1.00
- Pekerja P 10.00
TRAILER ke 2 (E35)
Kapasitas angkut V3 20.00
Faktor Efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu Siklus : Ts2
- Waktu tempuh isi = (Ld2 : v1) x 60 menit T6 75.00
- Waktu tempuh kosong = (Ld2 : v2) x 60 menit T7 50.00
- Waktu muat dan lain-lain T8 90.00
- Waktu bongkar dan lain-lain T9 90.00
Ts3 305.00
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Tambang
- Tackle
TENAGA
Diperlukan untuk memuat di pelabuhan ke truk Qt2 58,100
dan penurunan dari truk di lokasi pekerjaan Qt3 58,100
Kebutuhan tenaga : - Mandor M 2.00
- Pekerja P 20.00
Koefisien Tenaga / Kg :
- Mandor = ( M ) : (Qt2 + Qt3) (L03) 0.0000
- Pekerja = ( P ) : (Qt2 + Qt3) (L01) 0.0002
ITEM PEMBAYARAN NO. : 7.5 (2)
JENIS PEKERJAAN : Pengangkutan Bahan Jembatan
SATUAN PEMBAYARAN : buah URAIAN AN
Rp. 246.81 / Kg
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (2)
KM JENIS PEKERJAAN :Beton mutu tinggi fc’=45 Mpa
jam SATUAN PEMBAYARAN :M3
Kg/M3
-
Kg/M3 Berdasarkan NO. KOMPONEN
Kg/M3 JMF dari EE
Kg/M3
T/M3 A. TENAGA
T/M3
T/M3 1. Pekerja (L01)
T/M3 2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
1. Semen (M12)
2. Pasir Beton (M01a)
3. Agregat Kasar (M03)
Kg 4. Kayu Perancah (M19)
M3 565 5. Paku (M18)
M3 1,042 945
M3 1210
Kg
C. PERALATAN
SATUAN KETERANGAN
M3
jam
M3
M3
-
liter/menit
M3
jam
lumpsum
M3
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
orang
jam
jam
jam
Analisa EI-714
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (4)
KM JENIS PEKERJAAN :Beton mutu tinggi fc’=35 Mpa
jam SATUAN PEMBAYARAN :M3
Kg/M3
mm
-
Kg/M3 Berdasarkan NO. KOMPONEN
Kg/M3 JMF dari EE
Kg/M3
T/M3 A. TENAGA
T/M3
T/M3 1. Pekerja (L01)
T/M3 2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
1. Semen (M12)
2. Pasir Beton (M01a)
3. Agregat Kasar (M03)
Kg 4. Kayu Perancah (M19)
M3 653 5. Paku (M18)
M3 1,042
M3
Kg
C. PERALATAN
Analisa EI-714
SATUAN KETERANGAN
jam
M3
M3
-
liter/menit
M3
jam
M3
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
orang
jam
jam
jam
Analisa EI-715a
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (5) a
KM JENIS PEKERJAAN :Beton mutu sedang fc’=30 MPa lantai je
jam SATUAN PEMBAYARAN :M3
Kg/M3
mm
-
Kg/M3 Berdasarkan NO. KOMPONEN
Kg/M3 JMF dari EE
Kg/M3
T/M3 A. TENAGA
T/M3
T/M3 1. Pekerja (L01)
T/M3 2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
1. Semen (M12)
2. Pasir Beton (M01a)
3. Agregat Kasar (M03)
4. Kayu Perancah (M19)
Kg 5. Paku (M18)
M3 669
M3 1,042
M3
Kg C. PERALATAN
menit
menit
menit
menit
menit
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
M3/jam E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
km/jam 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
km/jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
menit
menit
menit
menit
menit
Analisa EI-715a
SATUAN KETERANGAN
M3
jam
M3
M3
-
liter/menit
M3
jam
M3
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
orang
945
jam 1210
jam
jam
Analisa EI-716
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (6)
KM JENIS PEKERJAAN :Beton mutu sedang fc’= 25 Mpa
jam SATUAN PEMBAYARAN :M3
Kg/M3
mm
-
Kg/M3 Berdasarkan NO. KOMPONEN
Kg/M3 JMF dari EE
Kg/M3
T/M3 A. TENAGA
T/M3
T/M3 1. Pekerja (L01)
T/M3 2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
1. Semen (M12)
2. Pasir beton (M01a)
3. Agregat Kasar (M03)
4. Kayu Perancah (M19)
Kg 5. Paku (M18)
M3 663
M3 1,042
M3
Kg C. PERALATAN
menit
menit
menit
menit
menit
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
M3/jam E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
km/jam 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
km/jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
menit
menit
menit
menit
menit
Analisa EI-716
SATUAN KETERANGAN
M3
jam
M3
M3
-
liter/menit
M3
jam
M3
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
orang
jam
jam
jam
945
1210
Analisa EI-717a
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (7) a
KM JENIS PEKERJAAN :Beton mutu sedang fc’= 20 MPa
jam SATUAN PEMBAYARAN :M3
Kg/M3
mm
-
Kg/M3 Berdasarkan NO. KOMPONEN
Kg/M3 JMF dari EE
Kg/M3
T/M3 A. TENAGA
T/M3
T/M3 1. Pekerja Biasa (L01)
T/M3 2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
1. Semen (M12)
2. Pasir beton (M01a)
3. Agregat Kasar (M03)
4. Kayu Perancah (M19)
Kg 5. Paku (M18)
M3
M3
M3
Kg C. PERALATAN
menit
menit
menit
menit
menit
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
M3 E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
km/jam 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
km/jam yang dibayar dari kontrak) dan biaya-biaya lainnya.
menit
menit
menit
menit
menit
Analisa EI-717a
SATUAN KETERANGAN
M3
jam
M3
M3
-
liter/menit
M3
jam
M3
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
orang
jam
jam
jam
Analisa EI-718
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (8)
KM JENIS PEKERJAAN :Beton mutu rendah fc’= 15 MPa
jam SATUAN PEMBAYARAN :M3
Kg/M3
-
Kg/M3 Berdasarkan NO. KOMPONEN
Kg/M3 JMF dari EE
Kg/M3
T/M3 A. TENAGA
T/M3
T/M3 1. Pekerja (L01)
T/M3 2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
1. Semen (M12)
2. Pasir beton (M01a)
3. Agregat Kasar (M03)
4. Kayu Perancah (M19)
Kg 5. Paku (M18)
M3 653.10
M3 1,267.35
M3
Kg C. PERALATAN
menit
menit
menit
menit
menit
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
M3/jam E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
M3 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
- 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
liter/menit yang dibayar dari kontrak) dan biaya-biaya lainnya.
M3
jam
Berlanjut ke hal. berikut.
Analisa EI-718
SATUAN KETERANGAN
M3
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
orang
jam
jam
jam
Analisa EI-719
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (9)
KM JENIS PEKERJAAN :Beton Siklop fc’=15 Mpa
jam SATUAN PEMBAYARAN :M3
Kg/M3 K-175
-
Kg/M3 Berdasarkan NO. KOMPONEN
Kg/M3 JMF dari EE
Kg/M3
T/M3 A. TENAGA
T/M3
T/M3 1. Pekerja (L01)
T/M3 2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
1. Semen (M12)
2. Pasir beton (M01a)
3. Agregat Kasar (M03)
4. Batu Belah (M06)
Kg
M3
M3
M3 C. PERALATAN
menit
menit
menit
menit
menit
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
M3 E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
M3 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
- 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
liter/menit yang dibayar dari kontrak) dan biaya-biaya lainnya.
M3
jam
Analisa EI-719
SATUAN KETERANGAN
M3
jam
M3
orang
orang
1 Tk = 20 m3 btn
orang
orang
jam
jam
jam
Analisa EI-7110
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (10)
KM JENIS PEKERJAAN :Beton mutu rendah fc’= 10 Mpa
jam SATUAN PEMBAYARAN :M3
Kg/M3
-
Kg/M3 Berdasarkan NO. KOMPONEN
Kg/M3 JMF dari EE
Kg/M3
T/M3 A. TENAGA
T/M3
T/M3 1. Pekerja (L01)
T/M3 2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
1. Semen (M12)
2. Pasir beton (M01a)
3. Agregat Kasar (M03)
4 Kayu Perancah (M19)
Kg 5 Paku (M18)
M3
M3 Agregat Kasar
M3
Kg C. PERALATAN
M3
jam
Analisa EI-7110
SATUAN KETERANGAN
M3
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
orang
jam
jam
jam
Analisa EI-721a
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.2 (1a)
JENIS PEKERJAAN : Penyediaan Unit Pracetak Gelagar Tipe
SATUAN PEMBAYARAN : Buah
NO. KOMPONEN
Buah
A. TENAGA
B. BAHAN
C. PERALATAN
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-721a
SATUAN KETERANGAN
Analisa EI-721b
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.2 (1b)
JENIS PEKERJAAN : Penyediaan Unit Pracetak Gelagar Tipe
SATUAN PEMBAYARAN : Buah
NO. KOMPONEN
Buah
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-721a
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
Analisa EI-721c
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.2 (1c)
JENIS PEKERJAAN : Unit Pracetak Gelagar I Penyediaan Un
SATUAN PEMBAYARAN : Buah
NO. KOMPONEN
Buah
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-721a
ntang … meter
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
Analisa EI-721a
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
jam ………………………………………………
M PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 7.2 (1a)
JENIS PEKERJAAN : Unit Pracetak Gelagar I Penyediaan Un
kg/m3 SATUAN PEMBAYARAN : Buah
NO. KOMPONEN
M3 tinggi 90
kg tabel
kg tabel A. TENAGA
Buah analisa tabel
M 1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
Buah sepasang
-
menit
menit
menit B. BAHAN
menit
menit C. PERALATAN
menit 1. Crane 1
2 Crane 2
Bh/jam 3 Alat Bantu
jam
Buah
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT
orang F. HARGA SATUAN PEKERJAAN ( D + E )
orang Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
jam 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-721a
ntang 16 meter
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
Analisa EI-721b
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
jam ………………………………………………
M PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 7.2 (1b)
JENIS PEKERJAAN : Unit Pracetak Gelagar I Penyediaan Un
kg/m3 SATUAN PEMBAYARAN : Buah
NO. KOMPONEN
M3 tinggi 90
kg tabel
kg tabel A. TENAGA
Buah analisa tabel
M 1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
Buah sepasang
-
menit
menit
menit B. BAHAN
menit
menit C. PERALATAN
menit 1. Crane 1
2 Crane 2
Bh/jam 3 Alat Bantu
jam
Buah
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT
orang F. HARGA SATUAN PEKERJAAN ( D + E )
orang Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
jam 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-721a
Bentang 25 meter
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
Analisa EI-721c
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
jam ………………………………………………
M PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 7.2 (1c)
JENIS PEKERJAAN : Unit Pracetak Gelagar I Penyediaan Un
kg/m3 SATUAN PEMBAYARAN : Buah
NO. KOMPONEN
M3 tinggi 90
kg tabel
kg tabel A. TENAGA
Buah analisa tabel
M 1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
Buah sepasang
-
menit
menit
menit B. BAHAN
menit
menit C. PERALATAN
menit 1. Crane 1
2 Crane 2
Bh/jam 3 Alat Bantu
jam
Buah
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT
orang F. HARGA SATUAN PEKERJAAN ( D + E )
orang Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
jam 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-721a
ntang … meter
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
Analisa EI-723a
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.2 (3)a
JENIS PEKERJAAN : Penyediaan Unit Pracetak Gelagar Tipe
SATUAN PEMBAYARAN : Buah
NO. KOMPONEN
Buah
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-721a
SATUAN KETERANGAN
Analisa EI-723b
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.2 (3)b
JENIS PEKERJAAN : Penyediaan Unit Pracetak Gelagar Tipe
SATUAN PEMBAYARAN : Buah
NO. KOMPONEN
Buah
A. TENAGA
B. BAHAN
C. PERALATAN
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-721a
SATUAN KETERANGAN
Analisa EI-724a
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
jam ………………………………………………
M PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 7.2 (4)a
JENIS PEKERJAAN : Pemasangan Unit Pracetak Gelagar Tip
kg/m3 SATUAN PEMBAYARAN : Buah
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
Buah sepasang
-
menit
menit
menit B. BAHAN
Bh/jam
jam
Buah
-
menit
menit C. PERALATAN
menit 1. Crane 1
2 Crane 2
Bh/jam 3 Jack Hidraulik
3 Alat Bantu
jam
jam
jam
jam
Analisa EI-721a
SATUAN KETERANGAN
FORMULIR STANDAR UNTU
PEREKAMAN ANALISA MASING-MASING H
Analisa EI-724b
PROYEK :
URAIAN ANALISA HARGA SATUAN No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
SATUAN KETERANGAN PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.2 (4)b
JENIS PEKERJAAN : Pemasangan Unit Pracetak Gelagar Tip
SATUAN PEMBAYARAN : Buah
jam
M
M
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
Buah sepasang
-
menit
menit
menit
Bh/jam
jam
C. PERALATAN
1. Crane 1
Buah 2 Crane 2
- 3 Jack Hidraulik
3 Alat Bantu
menit
menit
menit
Bh/jam
Buah
orang
orang
orang
jam
jam
jam
Analisa EI-721a
SATUAN KETERANGAN
Analisa EI-727
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
KM ………………………………………………
jam PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.2.(7)
JENIS PEKERJAAN : Baja Prategang
SATUAN PEMBAYARAN : Kg
NO. KOMPONEN
Kg
A. TENAGA
Buah
Jam
Buah
-
C. PERALATAN
menit Lumpsum
menit 1. Dump Truck E08
menit 2. Crane E07
3. Alat Bantu
Bh/jam
jam
Lumpsum
Lanjutan
SATUAN KETERANGAN
Analisa EI-728
5 meter
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTU
PEREKAMAN ANALISA MASING-MASING H
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : …………………………………………
NAMA PAKET : …………………………………………
jam …………………………………………
M Dari Gambar PROP / KAB / KODYA : …………………………………………
M Standar Bangunan ITEM PEMBAYARAN NO. : 7.2.(8)
Atas Jembatan JENIS PEKERJAAN : Penyediaan Pelat Berongga (Voide
Kg/m3 Voided Slab SATUAN PEMBAYARAN : Buah
Kg/m3
Km
m2 Lihat gambar NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
m3 asumsi
kg lihat gambar
C. PERALATAN
1. Crane
2. Concrete Pump
Kg 3. Penarik Kabel (jack)
4. Alat Grouting
5. Alat Bantu
m2 asumsi 6.
jam
Analisa EI-728
5 meter
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
M3
-
KM / Jam
KM / Jam Asumsi
Asumsi
menit
menit
menit
menit
M3
jam
M3
-
-
menit
menit
menit
menit
menit
M3
Jam
Titik
-
menit Asumsi
menit Asumsi
menit
Ttk/jam
jam
Titik
-
menit Asumsi
menit Asumsi
menit
Ttk/jam
jam
Analisa EI-728
5 meter
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
Buah Asumsi
orang Asumsi
orang Asumsi
orang Asumsi
jam
jam
jam
Analisa EI-R327
5 meter
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTU
PEREKAMAN ANALISA MASING-MASING H
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : …………………………………………
NAMA PAKET : …………………………………………
jam …………………………………………
M Dari Gambar PROP / KAB / KODYA : …………………………………………
M Standar Bangunan ITEM PEMBAYARAN NO. : 7.2.(9)
Atas Jembatan Flat JENIS PEKERJAAN : Pemasangan Pelat Berongga (Void
Kg/m3 Slab SATUAN PEMBAYARAN : Buah
Kg/m3
Km
m2 Lihat gambar NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
m2 asumsi
1. Crane
2. Concrete Pump
Kg 3. Penarik Kabel (jack)
4. Alat Grouting
5. Alat Bantu
m2 asumsi 6.
Analisa EI-R327
5 meter
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
M3
-
KM / Jam
KM / Jam Asumsi
Asumsi
menit
menit
menit
menit
M3
jam
M3
-
-
menit
menit
menit
menit
menit
M3
Jam
Titik
-
menit Asumsi
menit Asumsi
menit
Ttk/jam
jam
Titik
-
menit Asumsi
menit Asumsi
menit
Ttk/jam
jam
Analisa EI-R327
5 meter
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
Buah Asumsi
orang Asumsi
orang Asumsi
orang Asumsi
jam
jam
jam
Analisa EI-7210
elah pengecoran (post tension)
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTU
PEREKAMAN ANALISA MASING-MASING H
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
jam ITEM PEMBAYARAN NO. : Beton Diafragma fc’ 30 MPa termasuk p
JENIS PEKERJAAN : 7.2.(10)
M3 SATUAN PEMBAYARAN : m3
kg/m3
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
m3 3. Mandor (L03)
kg
B. BAHAN
menit
menit
menit
Bh/jam
C. PERALATAN
jam
1. Crane E07
2 Alat Bantu
Lumpsum
Buah
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT
orang F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
jam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-7210
h pengecoran (post tension)
Lanjutan
SATUAN KETERANGAN
Analisa EI-731
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (1)
KM JENIS PEKERJAAN :Baja Tulangan U 24 Polos
jam SATUAN PEMBAYARAN : Kg
-
NO. KOMPONEN
A. TENAGA
Ls B. BAHAN
Kg
orang
orang
orang C. PERALATAN
1. Alat Bantu
jam
jam
jam
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (2)
KM JENIS PEKERJAAN :Baja Tulangan U 32 Polos
jam SATUAN PEMBAYARAN : Kg
-
NO. KOMPONEN
A. TENAGA
Ls B. BAHAN
Kg
orang
orang
orang C. PERALATAN
1. Alat Bantu
jam
jam
jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-733
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (3)
KM JENIS PEKERJAAN :Baja Tulangan U 32 Ulir
jam SATUAN PEMBAYARAN : Kg
-
NO. KOMPONEN
A. TENAGA
Ls B. BAHAN
Kg
orang
orang
orang C. PERALATAN
1. Alat Bantu
jam
jam
jam
Analisa EI-734
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (4)
KM JENIS PEKERJAAN :Baja Tulangan U 39 Ulir
jam SATUAN PEMBAYARAN : Kg
-
NO. KOMPONEN
A. TENAGA
Ls B. BAHAN
Kg
orang
orang
orang C. PERALATAN
1. Alat Bantu
jam
jam
jam
Analisa EI-735
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (5)
KM JENIS PEKERJAAN :Baja Tulangan U 48 Ulir
jam SATUAN PEMBAYARAN : Kg
-
NO. KOMPONEN
A. TENAGA
Ls B. BAHAN
Kg
orang
orang
orang C. PERALATAN
1. Alat Bantu
jam
jam
jam
Analisa EI-736
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (6)
KM JENIS PEKERJAAN :Anyaman Kawat Yang Dilas (Welded Wi
jam SATUAN PEMBAYARAN : Kg
-
NO. KOMPONEN
A. TENAGA
Ls B. BAHAN
Kg
orang
orang
orang C. PERALATAN
1. Alat Bantu
jam
jam
jam
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
KM ITEM PEMBAYARAN NO. : 7.4 (1) a
jam JENIS PEKERJAAN :Penyediaan Baja Struktur BJ 34 (Titik Le
KM SATUAN PEMBAYARAN : Kg
Kg
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
kg
B. BAHAN
Kg
1. Baja Struktur BJ 34 (Titik Leleh 210 MPa)
Km/Jam
Km/Jam
menit
menit
menit
menit
C. PERALATAN
kg
1. Tronton (E35)
2. Crane (E07)
Jam 3. Alat Bantu
Buah
-
menit Lumpsum
menit
menit D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT
Kg/jam F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
Lumpsum terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-741a
SATUAN KETERANGAN
kg
orang
orang
orang
jam
jam
jam
Analisa EI-742a
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
KM ITEM PEMBAYARAN NO. : 7.4 (2) a
jam JENIS PEKERJAAN :Pemasangan Baja Struktur BJ 34 (Titik L
KM SATUAN PEMBAYARAN : Kg
Kg
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
buah
- 1. Sudah ada
menit
menit
menit
menit
Kg/jam
C. PERALATAN
Jam
1. Tronton (E35)
2. Crane (E31)
Lumpsum 3. Alat Bantu
kg
orang
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
jam Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-741b
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
KM ITEM PEMBAYARAN NO. : 7.4 (1) b
jam JENIS PEKERJAAN :Penyediaan Baja Struktur BJ 37 (Titik Le
KM SATUAN PEMBAYARAN : Kg
Kg
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
kg
B. BAHAN
Kg
1. Baja Struktur BJ 37 (Titik Leleh 240 MPa)
Km/Jam
Km/Jam
menit
menit
menit
menit
C. PERALATAN
kg
1. Tronton (E35)
2. Crane (E07)
Jam 3. Alat Bantu
Buah
-
menit Lumpsum
menit
menit D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT
Kg/jam F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
Lumpsum terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-741b
SATUAN KETERANGAN
kg
orang
orang
orang
jam
jam
jam
Analisa EI-742b
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
KM ITEM PEMBAYARAN NO. : 7.4 (2) b
jam JENIS PEKERJAAN :Pemasangan Baja Struktur BJ 37 (Titik L
KM SATUAN PEMBAYARAN : Kg
Kg
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
buah
- 1. Sudah ada
menit
menit
menit
menit
Kg/jam
C. PERALATAN
Jam
1. Tronton (E35)
2. Crane (E31)
Lumpsum 3. Alat Bantu
kg
orang
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
jam Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-741c
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
KM ITEM PEMBAYARAN NO. : 7.4 (1) c
jam JENIS PEKERJAAN :Penyediaan Baja Struktur BJ …. (Titik L
KM SATUAN PEMBAYARAN : Kg
Kg
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
kg
B. BAHAN
Kg
1. Baja Struktur BJ ……. (Titik Leleh …... MPa)
Km/Jam
Km/Jam
menit
menit
menit
menit
C. PERALATAN
kg
1. Tronton (E35)
2. Crane (E07)
Jam 3. Alat Bantu
Buah
-
menit Lumpsum
menit
menit D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT
Kg/jam F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
Lumpsum terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
kg
orang
orang
orang
jam
jam
jam
Analisa EI-742c
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
KM ITEM PEMBAYARAN NO. : 7.4 (2) c
jam JENIS PEKERJAAN :Pemasangan Baja Struktur BJ …. (Titik
KM SATUAN PEMBAYARAN : Kg
Kg
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
buah
- 1. Sudah ada
menit
menit
menit
menit
Kg/jam
C. PERALATAN
Jam
1. Tronton (E35)
2. Crane (E31)
Lumpsum 3. Alat Bantu
kg
orang
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
jam Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-751
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTU
PEREKAMAN ANALISA MASING-MASING H
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
KM ………………………………………………
jam PROP / KAB / KODYA : ………………………………………………
Kg ITEM PEMBAYARAN NO. : 7.5 (1)
JENIS PEKERJAAN :Pemasangan jembatan Rangka Baja
Kg rata-rata SATUAN PEMBAYARAN : Kg
NO. KOMPONEN
A. TENAGA
M3 per kg rangka
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
batang
-
menit B. BAHAN
menit
menit Kayu Perancah (M19)
menit
Kg/jam
Jam
Lumpsum C. PERALATAN
kg/jam
orang
orang
orang
jam
jam D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
jam E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-752
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.5 (2)
KM JENIS PEKERJAAN : Pengangkutan Bahan Jembatan
Millaut SATUAN PEMBAYARAN : buah
KM
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2 Mandor (L02)
3
B. BAHAN
Ton
-
KM/jam
KM/jam
C. PERALATAN
menit
menit 1. Trailer 1 E35
menit 2. Trailer 2 E35
menit 2. Crane 1 E07
3. Crane 2 E07
kg 4. Crane 3 E07
5 Angkutan Kapal Laut
jam 6 Alat Bantu
Kg
orang
orang
Analisa EI-752
SATUAN KETERANGAN
Millaut
Ton Ton
- -
KM/jam KM/jam
KM/jam KM/jam
menit
menit
menit
menit
menit
kg
jam
ton
-
menit
menit
menit
kg
jam
ton
-
menit
menit
menit
Ton
jam
Lump Sump
Kg Crane 2
Kg Crane 3
orang 2 regu
orang 2 regu
jam
jam
Berlanjut ke hal. berikut.
Analisa EI-752
SATUAN KETERANGAN
Analisa EI-712
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
eton mutu tinggi fc’=45 Mpa TOTAL HARGA (Rp.) : 1,385,837.81
% THD. BIAYA PROYEK : 0.08
AN PERALATAN ( A + B + C ) 1,205,076.36
15.0 % x D 180,761.45
1,385,837.81
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
eton mutu tinggi fc’=35 Mpa TOTAL HARGA (Rp.) : 1,309,759.31
% THD. BIAYA PROYEK : 0.08
PERKIRAAN HARGA JUMLAH
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
AN PERALATAN ( A + B + C ) 1,138,921.13
15.0 % x D 170,838.17
1,309,759.31
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
eton mutu sedang fc’=30 MPa lantai jembaTOTAL HARGA (Rp.) : 1,282,674.47
% THD. BIAYA PROYEK : 0.08
AN PERALATAN ( A + B + C ) 1,115,369.11
15.0 % x D 167,305.37
1,282,674.47
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
eton mutu sedang fc’= 25 Mpa TOTAL HARGA (Rp.) : 979,741.15
% THD. BIAYA PROYEK : 0.06
AN PERALATAN ( A + B + C ) 851,948.82
15.0 % x D 127,792.32
979,741.15
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
AN PERALATAN ( A + B + C ) 821,537.89
15.0 % x D 123,230.68
944,768.57
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
raan setiap komponen untuk menyelesaikan satu satuan pekerjaan
atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
masuk bahan bakar, bahan habis dipakai dan operator.
aran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
aya lainnya.
Analisa EI-718
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
eton mutu rendah fc’= 15 MPa TOTAL HARGA (Rp.) : 657,219.67
% THD. BIAYA PROYEK : 0.04
AN PERALATAN ( A + B + C ) 571,495.37
15.0 % x D 85,724.30
657,219.67
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
eton Siklop fc’=15 Mpa TOTAL HARGA (Rp.) : 517,140.56
% THD. BIAYA PROYEK : 0.03
AN PERALATAN ( A + B + C ) 449,687.45
15.0 % x D 67,453.12
517,140.56
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
eton mutu rendah fc’= 10 Mpa TOTAL HARGA (Rp.) : 570,482.56
% THD. BIAYA PROYEK : 0.03
AN PERALATAN ( A + B + C ) 496,071.79
15.0 % x D 74,410.77
570,482.56
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
(Rp.) (Rp.)
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
enyediaan Unit Pracetak Gelagar Tipe 1 BTOTAL HARGA (Rp.) : 23,000,000.00
% THD. BIAYA PROYEK : 1.41
(Rp.) (Rp.)
AN PERALATAN ( A + B + C ) 20,000,000.00
15.0 % x D 3,000,000.00
23,000,000.00
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
nit Pracetak Gelagar I Penyediaan Unit P TOTAL HARGA (Rp.) : 0.00
00 % THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
AN PERALATAN ( A + B + C ) 0.00
15.0 % x D 0.00
0.00
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
nit Pracetak Gelagar I Penyediaan Unit P TOTAL HARGA (Rp.) : 17,250,000.00
% THD. BIAYA PROYEK : 1.06
(Rp.) (Rp.)
AN PERALATAN ( A + B + C ) 20,582,006.38
15.0 % x D 3,087,300.96
23,669,307.33
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
nit Pracetak Gelagar I Penyediaan Unit P TOTAL HARGA (Rp.) : 23,000,000.00
% THD. BIAYA PROYEK : 1.41
(Rp.) (Rp.)
AN PERALATAN ( A + B + C ) 35,495,957.67
15.0 % x D 5,324,393.65
40,820,351.33
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
nit Pracetak Gelagar I Penyediaan Unit P TOTAL HARGA (Rp.) : 0.00
00 % THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 33,490,348.00
15.0 % x D 5,023,552.20
38,513,900.20
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
enyediaan Unit Pracetak Gelagar Tipe U TOTAL HARGA (Rp.) : 17,250,000.00
L (m) = 16 % THD. BIAYA PROYEK : 1.06
(Rp.) (Rp.)
AN PERALATAN ( A + B + C ) 15,000,000.00
15.0 % x D 2,250,000.00
17,250,000.00
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
enyediaan Unit Pracetak Gelagar Tipe U TOTAL HARGA (Rp.) : 0.00
L (m) = 0 % THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
AN PERALATAN ( A + B + C ) 0.00
15.0 % x D 0.00
0.00
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
emasangan Unit Pracetak Gelagar Tipe U TOTAL HARGA (Rp.) : 477,229.13
L (m) = 16 % THD. BIAYA PROYEK : 0.03
(Rp.) (Rp.)
AN PERALATAN ( A + B + C ) 414,981.85
15.0 % x D 62,247.28
477,229.13
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
emasangan Unit Pracetak Gelagar Tipe U TOTAL HARGA (Rp.) : 477,229.13
00 % THD. BIAYA PROYEK : 0.03
(Rp.) (Rp.)
jam 18.0000 4,657.31 83,831.66
jam 5.0000 6,088.57 30,442.86
jam 1.0000 7,281.29 7,281.29
AN PERALATAN ( A + B + C ) 414,981.85
15.0 % x D 62,247.28
477,229.13
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
aja Prategang TOTAL HARGA (Rp.) : 109,473.81
% THD. BIAYA PROYEK : 0.01
AN PERALATAN ( A + B + C ) 95,194.62
15.0 % x D 14,279.19
109,473.81
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
enyediaan Pelat Berongga (Voided SlTOTAL HARGA (Rp.) : 11,783,126.61
5 meter % THD. BIAYA PROYEK : 0.72
AN PERALATAN ( A + B + C ) 10,246,197.05
15.0 % x D 1,536,929.56
11,783,126.61
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
emasangan Pelat Berongga (Voided STOTAL HARGA (Rp.) : 12,920,041.13
5 meter % THD. BIAYA PROYEK : 0.79
PERKIRAAN HARGA JUMLAH
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
AN PERALATAN ( A + B + C ) 11,234,818.37
15.0 % x D 1,685,222.76
12,920,041.13
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
eton Diafragma fc’ 30 MPa termasuk pekePERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 647,318.14
% THD. BIAYA PROYEK : 0.04
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
aja Tulangan U 24 Polos TOTAL HARGA (Rp.) : 11,870.26
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 10,321.96
15.0 % x D 1,548.29
11,870.26
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
aja Tulangan U 32 Polos TOTAL HARGA (Rp.) : 11,864.51
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 10,316.96
15.0 % x D 1,547.54
11,864.51
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-733
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
aja Tulangan U 32 Ulir TOTAL HARGA (Rp.) : 12,623.51
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 10,976.96
15.0 % x D 1,646.54
12,623.51
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-734
AN PERALATAN ( A + B + C ) 9,949.46
15.0 % x D 1,492.42
11,441.88
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-735
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
aja Tulangan U 48 Ulir TOTAL HARGA (Rp.) : 12,623.51
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 10,976.96
15.0 % x D 1,646.54
12,623.51
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-736
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
nyaman Kawat Yang Dilas (Welded Wire MTOTAL HARGA (Rp.) : 42,042.94
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 36,559.08
15.0 % x D 5,483.86
42,042.94
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
enyediaan Baja Struktur BJ 34 (Titik Leleh TOTAL HARGA (Rp.) : 12,801.30
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 11,131.57
15.0 % x D 1,669.73
12,801.30
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
emasangan Baja Struktur BJ 34 (Titik Lele TOTAL HARGA (Rp.) : 396.14
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 344.47
15.0 % x D 51.67
396.14
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-741b
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
enyediaan Baja Struktur BJ 37 (Titik Leleh TOTAL HARGA (Rp.) : 12,801.30
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 11,131.57
15.0 % x D 1,669.73
12,801.30
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
emasangan Baja Struktur BJ 37 (Titik Lele TOTAL HARGA (Rp.) : 396.14
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 344.47
15.0 % x D 51.67
396.14
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-741c
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
enyediaan Baja Struktur BJ …. (Titik Leleh TOTAL HARGA (Rp.) : 151.30
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 131.57
15.0 % x D 19.73
151.30
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 0.00
emasangan Baja Struktur BJ …. (Titik Lel TOTAL HARGA (Rp.) : 396.14
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 344.47
15.0 % x D 51.67
396.14
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-751
FORMULIR STANDAR UNTUK
AN ANALISA MASING-MASING HARGA SATUAN
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
emasangan jembatan Rangka Baja TOTAL HARGA (Rp.) : 492.01
% THD. BIAYA PROYEK : 0.00
AN PERALATAN ( A + B + C ) 427.84
15.0 % x D 64.18
492.01
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-752
………………………………………………
…………………………………………………………………..
……………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : Err:509
engangkutan Bahan Jembatan TOTAL HARGA (Rp.) : Err:509
% THD. BIAYA PROYEK : Err:509
AN PERALATAN ( A + B + C ) 214.62
15.0 % x D 32.19
246.81
perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
h1
h2
h3
h4
A
B
C
AxH=
(B-A)xh1=
((B-A)xh2)/2=
(C-A)xh4=
((C-A)xh3)/2=
total luas
h1
h2
h3
h4
A
B
C
AxH=
(B-A)xh1=
((B-A)xh2)/2=
(C-A)xh4=
((C-A)xh3)/2=
total luas
h1
h2
h3
h4
A
B
C
AxH=
(B-A)xh1=
((B-A)xh2)/2=
(C-A)xh4=
((C-A)xh3)/2=
total luas
h1
h2
h3
h4
A
B
C
AxH=
(B-A)xh1=
((B-A)xh2)/2=
(C-A)xh4=
((C-A)xh3)/2=
total luas
h1
h2
h3
h4
A
B
C
AxH=
(B-A)xh1=
((B-A)xh2)/2=
(C-A)xh4=
((C-A)xh3)/2=
total luas
h1
h2
h3
h4
A
B
C
AxH=
(B-A)xh1=
((B-A)xh2)/2=
(C-A)xh4=
((C-A)xh3)/2=
total luas
h1
h2
h3
h4
A
B
C
AxH=
(B-A)xh1=
((B-A)xh2)/2=
(C-A)xh4=
((C-A)xh3)/2=
total luas
Luas form work #REF! #REF! #REF! #REF! #REF! #REF! #REF!
berat form work #REF! #REF! #REF! #REF! #REF! #REF! #REF!
penyokong (10%fw) 10.00% 10.00% 10%fw 10%fw 10%fw 10%fw 10.00%
berat penyokong+dll #REF! #REF! #VALUE! #VALUE! #VALUE! #VALUE! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
Tinggi (H)
Unit 0.9 1.25 1.6
Luas form work #REF! #REF! #REF! #REF! #REF! #REF! #REF!
berat form work #REF! #REF! #REF! #REF! #REF! #REF! #REF!
penyokong (10%fw) 10.00% 10.00% 10%fw 10%fw 10%fw 10%fw 10.00%
berat penyokong+dll #REF! #REF! #VALUE! #VALUE! #VALUE! #VALUE! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
Tinggi (H)
Unit 0.9 1.25 1.6
Luas form work #REF! #REF! #REF! #REF! #REF! #REF! #REF!
berat form work #REF! #REF! #REF! #REF! #REF! #REF! #REF!
penyokong (10%fw) 10.00% 10.00% 10%fw 10%fw 10%fw 10%fw 10.00%
berat penyokong+dll #REF! #REF! #VALUE! #VALUE! #VALUE! #VALUE! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
Tinggi (H)
Unit 0.9 1.25 1.6
Luas form work #REF! #REF! #REF! #REF! #REF! #REF! #REF!
berat form work #REF! #REF! #REF! #REF! #REF! #REF! #REF!
penyokong (10%fw) 10.00% 10.00% 10%fw 10%fw 10%fw 10%fw 10.00%
berat penyokong+dll #REF! #REF! #VALUE! #VALUE! #VALUE! #VALUE! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
Tinggi (H)
Unit 0.9 1.25 1.6
Luas form work #REF! #REF! #REF! #REF! #REF! #REF! #REF!
berat form work #REF! #REF! #REF! #REF! #REF! #REF! #REF!
penyokong (10%fw) 10.00% 10.00% 10%fw 10%fw 10%fw 10%fw 10.00%
berat penyokong+dll #REF! #REF! #VALUE! #VALUE! #VALUE! #VALUE! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
Tinggi (H)
Unit 0.9 1.25 1.6
Luas form work #REF! #REF! #REF! #REF! #REF! #REF! #REF!
berat form work #REF! #REF! #REF! #REF! #REF! #REF! #REF!
penyokong (10%fw) 10.00% 10.00% 10%fw 10%fw 10%fw 10%fw 10.00%
berat penyokong+dll #REF! #REF! #VALUE! #VALUE! #VALUE! #VALUE! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
Tinggi (H)
Unit 0.9 1.25 1.6
Luas form work #REF! #REF! #REF! #REF! #REF! #REF! #REF!
berat form work #REF! #REF! #REF! #REF! #REF! #REF! #REF!
penyokong (10%fw) 10.00% 10.00% 10%fw 10%fw 10%fw 10%fw 10.00%
berat penyokong+dll #REF! #REF! #VALUE! #VALUE! #VALUE! #VALUE! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
ITEM PEMBAYARAN NO. : 7.6 (1)
JENIS PEKERJAAN : Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk
SATUAN PEMBAYARAN : M1 URAIAN ANALISA
I. ASUMSI
1 Dilakukan secara manual
2 Bahan diterima di lokasi Jembatan
3 Jam kerja efektif per-hari Tk 7.00
1. BAHAN
1.a. Bahan pondasi cerucuk (M52) 1.0000
2. ALAT
2.e. ALAT BANTU
Diperlukan alat bantu untuk pek pondasi cerucuk
- 1 set palu tripot
- Alat pertukangan
3. TENAGA
Produksi Tiang dalam 1 hari Qt 28.00
Rp. 36,234.08 / M1
I. ASUMSI
1 Bahan diterima di lokasi Jembatan
2 Jam kerja efektif per-hari Tk 7.00
3 Diameter tiang pancang kayu sesuai keperluan 200
1. BAHAN
1.a. Bahan tiang pancang kayu tanpa pengawetan (M52) 1.0000
2. ALAT
2.e. ALAT BANTU
- Alat bantu
-
-
3. TENAGA
Produksi Tiang dalam 1 hari Qt 21.00
Kebutuhan tenaga tambahan di lokasi ::
- Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 10.00
Rp. 42,562.10 / Kg
I. ASUMSI
1 Bahan diterima di lokasi Jembatan
2 Jam kerja efektif per-hari Tk 7.00
3 Diameter tiang pancang kayu sesuai keperluan 200
II. URUTAN KERJA
1 Pekerjaan ini hanya satu tahapan pekerjaan, yaitu
Pengadaan
1. BAHAN
1.a. - Bahan tiang pancang kayu (M52) 1.00
- Bahan pengawet: kreosot 1 liter/M1 0.25
2. ALAT
2.e. ALAT BANTU
- Alat bantu
3. TENAGA
Produksi Tiang dalam 1 hari Qt 21.00
Rp. 36,070.21 / Kg
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di sepanjang jalan
3 Turap baja diterima di base camp
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
4 Jam kerja efektif per-hari Tk 7.00
5 Ukuran dan tipe turap baja sesuai keperluan Uk 600.0
6 Tebal tiang t
7 Berat per-meter tiang b 187.00
8 Panjang Turap Baja (sesuai keperluan) p 12.0
1. BAHAN
1.a. Turap Baja (M52) 1.05
Plat Baja (untuk penyambungan) (M48) 0.21
Kawat Las (untuk sepatu & penyambungan) (M51) 0.05
2. ALAT
2.a. TRAILER (E29)
Kapasitas bak sekali muat V 10.00
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 26.18
- Waktu tempuh kosong = (L : v2) x 60 T2 17.45
- Lain-lain (bongkar dan muat) T3 80.00
Ts1 123.63
Kapasitas Produksi / Jam = V x p x Fa x 60 x b Q1 9,039.53
Ts1
3. TENAGA Qt 10.00
Produksi Tiang dalam 1 hari Qt 120.00
Qt 22,440
Kebutuhan tenaga tambahan di lokasi ::
- Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 12.00
Rp. 21,815.01 / Kg
1. BAHAN
1.a. Pipa baja tiang pancang (M52) 1.05
Plat Baja (untuk penyambungan) (M48) 0.21
2. ALAT
2.a. TRAILER (E29)
Kapasitas bak sekali muat V 12.00
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20
Kecepatan rata-rata kosong v2 30
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 26.18
- Waktu tempuh kosong = (L : v2) x 60 T2 17.45
- Lain-lain (bongkar dan muat) T3 80
Ts1 123.63
3. TENAGA Qt 12.00
Produksi Tiang dalam 1 hari Qt 144.00
Qt 22,320
Kebutuhan tenaga tambahan di lokasi ::
- Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 12.00
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt (L03) 0.5833
- Tukang = (Tk x Tb) : Qt (L02) 2.3333
- Pekerja = (Tk x P) : Qt (L01) 7.0000
Rp. 79,565.39 / Kg
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
4 Jam kerja efektif per-hari Tk 7.00
4 Ukuran diameter tiang pancang (sesuai keperluan) Uk 500.0
5 Tebal tiang t ??
6 Berat per-meter tiang b 155.00
7 Panjang Tiang (sesuai keperluan) p 12.0
1. BAHAN
1.a. Pipa baja tiang pancang (M52) 1.05
Plat Baja (untuk penyambungan) (M48) 0.21
2. ALAT
2.a. TRAILER (E29)
Kapasitas bak sekali muat V 12.00
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20
Kecepatan rata-rata kosong v2 30
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 26.18
- Waktu tempuh kosong = (L : v2) x 60 T2 17.45
- Lain-lain (bongkar dan muat) T3 80
Ts1 123.63
3. TENAGA Qt 12.00
Produksi Tiang dalam 1 hari Qt 144.00
Qt 22,320
Kebutuhan tenaga tambahan di lokasi ::
- Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 12.00
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt (L03) 0.5833
- Tukang = (Tk x Tb) : Qt (L02) 2.3333
- Pekerja = (Tk x P) : Qt (L01) 7.0000
Rp. 79,565.39 / Kg
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi jembatan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
4 Jam kerja efektif per-hari Tk 7.00
4 Ukuran diameter tiang pancang (sesuai keperluan) Uk 600.0
5 Tebal tiang t 12.00
6 Berat per-meter tiang b 187.00
7 Panjang Tiang (sesuai keperluan) p 12.0
1. BAHAN
1.a. Pipa baja tiang pancang (M52) 1.05
Plat Baja (untuk penyambungan) (M48) 0.21
2. ALAT
2.a. TRAILER (E29)
Kapasitas bak sekali muat V 10.00
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20
Kecepatan rata-rata kosong v2 30
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 26.18
- Waktu tempuh kosong = (L : v2) x 60 T2 17.45
- Lain-lain (bongkar dan muat) T3 80
Ts1 123.63
3. TENAGA Qt 10.00
Produksi Tiang dalam 1 hari Qt 120.00
Qt 22,440
Kebutuhan tenaga tambahan di lokasi ::
- Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 12.00
Koefisien Tenaga / kg :
- Mandor = (Tk x M) : Qt (L03) 0.7000
- Tukang = (Tk x Tb) : Qt (L02) 2.8000
- Pekerja = (Tk x P) : Qt (L01) 8.4000
Rp. 91,286.85 / Kg
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Tiang pancang kayu diterima di lokasi jembatan
3 Lokasi pekerjaan : di lokasi jembatan
4 Jam kerja efektif per-hari Tk 7.00
5 Panjang Tiang p 6.00
1. BAHAN
Pemakaian bahan pada pekerjaan penyiapan
material tiang pancang
2. ALAT
3. TENAGA
Produksi Tiang dalam 1 hari = Tk x Q1 Qt 15.49
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 8.00
Koefisien Tenaga / M1 :
- Mandor = ( Tk x M ) : Qt (L03) 0.4518
- Tukang = ( Tk x Tb ) : Qt (L02) 0.9036
- Pekerja = ( Tk x P ) : Qt (L01) 3.6145
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi
3 Jam kerja efektif per-hari Tk 7.00
4 Panjang Tiang p 20.0
5 Pemakaian Kawat las dan alat Las utk penyambungan
termasuk dalam item Penyediaan Tiang Pancang
1. BAHAN
Pemakaian bahan pada pekerjaan penyiapan
material tiang pancang
2. ALAT
3. TENAGA
Produksi Tiang dalam 1 hari = Tk x Q1 Qt 46.48
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 8.00
Koefisien Tenaga / M1 :
- Mandor = ( Tk x M ) : Qt (L03) 0.1506
- Tukang = ( Tk x Tb ) : Qt (L02) 0.3012
- Pekerja = ( Tk x P ) : Qt (L01) 1.2048
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi
3 Jam kerja efektif per-hari Tk 7.00
4 Panjang Tiang p 20.0
5 Pemakaian Kawat las dan alat Las utk penyambungan
termasuk dalam item Penyediaan Tiang Pancang
2. ALAT
3. TENAGA
Produksi Tiang dalam 1 hari = Tk x Q1 Qt 46.48
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 8.00
Koefisien Tenaga / M1 :
- Mandor = ( Tk x M ) : Qt (L03) 0.1506
- Tukang = ( Tk x Tb ) : Qt (L02) 0.3012
- Pekerja = ( Tk x P ) : Qt (L01) 1.2048
I. ASUMSI
1 Bahan diterima di lokasi Jembatan
2 Jam kerja efektif per-hari Tk 7.00
3 Diameter tiang pancang kayu sesuai keperluan …..
1. BAHAN
1.a. Bahan tiang pancang kayu tanpa pengawetan (M52) 1.0000
2. ALAT
2.e. ALAT BANTU
- Alat bantu
-
-
3. TENAGA
Produksi Tiang dalam 1 hari Qt 21.00
Rp. 42,562.10 / Kg
I. ASUMSI
1 Bahan diterima di lokasi Jembatan
2 Jam kerja efektif per-hari Tk 7.00
3 Diameter tiang pancang kayu sesuai keperluan 200
1. BAHAN
1.a. - Bahan tiang pancang kayu (M52) 1.00
- Bahan pengawet: kreosot 1 liter/M1 0.25
2. ALAT
2.e. ALAT BANTU
- Alat bantu
3. TENAGA
Produksi Tiang dalam 1 hari Qt 21.00
Rp. 28,882.71 / Kg
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Perbandingan Pasir & Semen : - Volume Semen Sm 25
: - Volume Pasir Ps 75
7 Perbandingan Batu & Mortar :
- Batu Bt 65
- Mortar (campuran semen & pasir) Mr 35
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40
- Batu D2 1.60
- Adukan (mortar) D3 1.80
- Pasir D4 1.30
- Semen Portland D5 1.44
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.1700
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 (M12) 0.1225
x {D5 x (1000)} (M12) 176.00
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01) 0.5088
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00
- Mengaduk T2 4.00
- Menuang T3 3.00
- Tunggu, dll. T4 2.00
Ts 17.00
PROYEK : 7.9.(1)
JENIS PEKERJAAN : Pasangan Batu
SATUAN PEMBAYARAN : M3 URAIAN ANALISA
3. TENAGA
Produksi menetukan : Produksi Concrete Mxer Q1 1.465
Produksi Pasangan Batu dengan Mortar / hari = Tk x Q1 Qt 10.25
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Batu Tb 2.00
- Pekerja P 8.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827
- Tukang = (Tk x Tb) : Qt (L02) 1.3655
- Pekerja = (Tk x P) : Qt (L01) 5.4618
Rp. 420,823.04 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Adukan encer sebagai pengisi adalah beton K-175 - -
7 Kadar Semen Adukan (Spec.K-175) : - Minimum Ks1 220
: - Maksimum Ks2 300
8 Perbandingan Air/Semen Maksimum (Spec.K-175) Wcr 0.57
9 Perbandingan Adukan (K-175) : Semen Sm 12.5
: Pasir Ps 37.5
: Kerikil Kr 50.0
10 Berat Jenis Material :
- Beton / Pasangan Batu Kosong Diisi Adukan D1 2.40
- Semen D2 1.25
- Pasir D3 1.30
- Kerikil / Batu D4 1.40
11 Perbandingan Batu & Adukan : - Batu Bt 70
- Adukan encer Ae 30
1. BAHAN
1.a. Semen (PC) = {Sm x D1 x Ae x 1000} : 40 (M12) 2.2500
1.b. Pasir = {(Ps x D1) : D3} x Ae x 1.05 (M01) 0.2181
1.c. Agregat Kasar = {(Kr x D1) : D4} x Ae x 1.1 (M03) 0.2829
1.d. Batu Belah = {(Bt x D1) : D4 x 1.1 (M06) 1.3200
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00
- Mengaduk T2 4.00
- Menuang T3 2.00
- Tunggu, dll. T4 3.00
Ts 17.00
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827
- Tukang = (Tk x Tb) : Qt (L02) 2.0482
- Pekerja = (Tk x P) : Qt (L01) 6.8273
Rp. 385,824.69 / M3
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu dan pasir) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan material Fh 1.10
1. BAHAN
1.a. Batu Belah (M06) 1.1000
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gerobak Dorong = 4 buah
- Palu Batu = 2 buah
3. TENAGA
Produksi pasangan batu kosong dalam 1 hari Qt 8.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 6.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.8750
- Tukang = (Tk x Tb) : Qt (L02) 1.7500
- Pekerja = (Tk x P) : Qt (L01) 5.2500
Rp. 215,058.08 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bronjong dengan kawat dilapisi galvanis diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor Kehilangan Material Fh 1.10
1. BAHAN
1.a. Bronjong dengan kawat dilapisi galvanis (M15) 15.00
1.b. Batu (M02) 1.1000
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Tang = 2 buah
- Pemotong kawat = 2 buah
- Palu pemecah batu = 2 buah
3. TENAGA
Produksi pekerjaan per hari Qt 8.00
dibutuhkan tenaga : - Mandor M 1.00
- Tukang Tb 3.00
- Pekerja P 6.00
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.8750
- Tukang = ( Tb x Tk ) : Qt (L02) 2.6250
- Pekerja = ( P x Tk ) : Qt (L01) 5.2500
Rp. 361,806.70 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jembatan
3 Bahan / material diterima seluruhnya di lokasi
pekerjaan proyek
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
1. BAHAN
1.a. Pipa d = 8.91 cm Galvanised (MXX) 1.000
2. ALAT
2.a. Alat pertukangan dan lain-lain
3. TENAGA
Produksi pasang Railingk dalam 1 hari
= Tk x Q1 = Qt 25.00
Rp. 15,264 / M1
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan di lokasi jembatan
3 Bahan / material diterima seluruhnya di lokasi
pekerjaan proyek
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
1. BAHAN
1.a. Marmer 0.750
2. ALAT
2.a. Alat bantu pertukangan
3. TENAGA
Produksi Papan Nama dalam 1 hari
= Tk x Q1 = Qt 1.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 7.00
- Tukang = (Tk x Tb) : Qt (L02) 0.00
- Pekerja = (Tk x P) : Qt (L01) 14.00
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.0
5 Faktor pengembangan bahan Fk 1.24
6 Berat volume beton lepas D1 2.40
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. JACK HAMMER & COMPRESSOR (E05 & E26)
Kapasitas bongkar bk 50.00
Faktor efesiensi Fa 0.80
Kapasitas prod/jam = Fa x 60 Q1 0.960
bk
Koefesien alat/M3 = 1 : Q1 1.0417
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 0.96
Produksi Galian / hari = Tk x Q1 Qt 6.72
Kebutuhan tenaga :
- Pekerja P 12.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 12.5000
- Mandor = (Tk x M) : Qt (L03) 1.0417
Rp. 278,637.94 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. COMPRESSOR, JACK HAMMER & LOADER
Produksi per jam Q1 3.00
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 3.00
Produksi Galian / hari = Tk x Q1 Qt 21.00
Kebutuhan tenaga :
- Pekerja P 16.00
- Mandor M 2.00
No. PAKET KONTRAK : 7.15.(5)
JENIS PEKERJAAN : Pembongkaran Rangka Baja
SATUAN PEMBAYARAN : M2 URAIAN ANALISA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 5.3333
- Mandor = (Tk x M) : Qt (L03) 0.6667
Rp. 193,679.64 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. CRANE; Palu; Linggis
Produksi per jam Q1 5.00
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 5.00
Produksi Galian / hari = Tk x Q1 Qt 35.00
Kebutuhan tenaga :
- Pekerja P 10.00
- Mandor M 1.00
PROYEK : 7.15.(6)
JENIS PEKERJAAN : Pembongkaran Balok Baja (Steel Stringers)
SATUAN PEMBAYARAN : M' URAIAN ANALISA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.0000
- Mandor = (Tk x M) : Qt (L03) 0.2000
Rp. 104,980.00 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : di lokasi
3 Jam kerja efektif per-hari Tk 7.00
4 Panjang Tiang p 20.00
5 Ukuran Tiang sesuai keperluan
6 Pemakaian Kawat las dan alat Las utk penyambungan
termasuk dlm item Penyediaan Tiang Pancang Beton
1. BAHAN
Pemakaian bahan pada pekerjaan penyiapan
material tiang pancang
2. ALAT
3. TENAGA
Produksi Tiang dalam 1 hari = Tk x Q1 Qt 46.48
Kebutuhan tenaga tambahan di lokasi ::
- Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 10.00
Koefisien Tenaga / M3 :
- Mandor = ( Tk x M ) : Qt (L03) 0.1506
- Tukang = ( Tk x Tb ) : Qt (L02) 0.3012
- Pekerja = ( Tk x P ) : Qt (L01) 1.5060
1. BAHAN
1.a. Beton K-250 = {1/4 Phi x (Uk)^2) x 1m (EI-715) 0.5027
1.b. Baja Tulangan = {EI-716 x Mb} (EI-731) 75.3982
1.c. Casing = Phi x Uk 2.5133
2. ALAT
3. TENAGA
Produksi Tiang dalam 1 titik bor = Q1 Qt 603.64
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00
- Tukang T 3.00
- Pekerja P 6.00
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Beton berdasarkan analisa item pekerjaan ybs
3 Baja tulangan berdasarkan analisa item ybs
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Panjang Tiang p 12.00
7 Ukuran diameter tiang bor beton Uk 1.00
8 Kebutuhan Baja tulangan Mb 150
1. BAHAN
1.a. Beton K-250 = {1/4 Phi x (Uk)^2) x 1m (EI-715) 0.7854
1.b. Baja Tulangan = {EI-716 x Mb} (EI-731) 117.8097
1.c. Casing = Phi x Uk 3.1416
2. ALAT
3. TENAGA
Produksi Tiang dalam 1 titik bor = Q1 Qt 603.64
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00
- Tukang T 3.00
- Pekerja P 6.00
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Turap Beton Pracetak diterima di Base Camp t 0.07
3 Turap beto dari Base Camp & diangkut ke lokasi pek.
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Panjang Turap (sesuai kebutuhan) Lt 0.99
7 Ukuran turap (sesuai kebutuhan) Uk 0.30
1. BAHAN
1.a. Turap Beton Pracetak K 350 per-meter persegi (M72) 0.0700
1.b. Joint Sealent (M94) 0.35
1.c. Plat Baja utk Sepatu turap/sambungan (t=12mm) (M48) 15.2681
2. ALAT
2.a TRAILER (untuk angkut ke lokasi pek.) (E29)
Kapasitas bak sekali muat V 20.00
Faktor efisiensi alat Fa 0.83
Kecepatanrata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 26.18
- Waktu tempuh kosong = (L : v2) x 60 T2 17.45
- Lain-Lain (tunggu, bongkar dan muat) T3 5.00
Ts1 48.63
Ts2 15.00
Ts2 12.00
3. TENAGA Qt 81.14
Untuk pemasangan dalam 1 hari Qt 80.35
Qt 5.68
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00
- Tukang (kayu & besi) Tb 1.00
- Pekerja P 5.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.2325
- Tukang = (Tk x Tb) : Qt (L02) 1.2325
- Pekerja = (Tk x P) : Qt (L01) 6.1623
Rp. 399,522.32 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan diatas air/sungai
3 Menggunakan ponton ditarik tag boat
4 Pengangkutan tiang pancang menggunakan crane
5 Jam kerja efektif per-hari Tk 7.00
6 Panjang Tiang sesuai kebutuhan
7 Ukuran diameter tiang pancang sesuai kebutuhan
1. BAHAN
2. ALAT
3. TENAGA
Produksi Tiang dalam 1 titik bor = Q1 Qt 6.27
Kebutuhan tenaga tambahan di lokasi :
- Mandor M 1.00
- Tukang T 2.00
- Pekerja P 6.00
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan diatas air/sungai
3 Menggunakan ponton ditarik tag boat
4 Pengangkutan tiang pancang menggunakan crane
5 Jam kerja efektif per-hari Tk 7.00
6 Panjang Tiang sesuai kebutuhan
7 Ukuran diameter tiang pancang sesuai kebutuhan
2. ALAT
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.0
5 Faktor pengembangan bahan Fk 1.24
6 Berat volume beton lepas D1 2.40
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. JACK HAMMER ( E26)
Kapasitas bongkar bk 60.00
Faktor efesiensi Fa 0.83
Kapasitas prod/jam = Fa x 60 Q1 0.830
bk
Koefesien alat/M3 = 1 : Q1 1.2048
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 0.83
Produksi Galian / hari = Tk x Q1 Qt 5.81
Kebutuhan tenaga :
- Pekerja P 8.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 9.6386
- Mandor = (Tk x M) : Qt (L03) 1.2048
Rp. 148,526.51 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. COMPRESSOR, JACK HAMMER & LOADER
Produksi per jam Q1 5.00
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 5.00
Produksi Galian / hari = Tk x Q1 Qt 35.00
Kebutuhan tenaga :
- Pekerja P 12.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.4000
- Mandor = (Tk x M) : Qt (L03) 0.2000
Rp. 152,189.22 / M3
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : . . . . . . . . . . . . bulan
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
2. ALAT
2.a. ASPAL CUTTER, COMPRESSOR, JACK HAMMER & LOADER
Produksi per jam Q1 20.00
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 20.00
Produksi Galian / hari = Tk x Q1 Qt 140.00
Kebutuhan tenaga :
- Pekerja P 12.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.6000
- Mandor = (Tk x M) : Qt (L03) 0.0500
Rp. 56,473.28 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.0
5 Faktor pengembangan bahan Fk 1.10
6 Berat volume kayu D1 1.50
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. JACK HAMMER ( E26)
Kapasitas bongkar bk
Faktor efesiensi Fa
Kapasitas prod/jam = Fa x 60 Q1
bk
Koefesien alat/M3 = 1 : Q1
3. TENAGA
Produksi menentukan : alat bantu Q3 3.48
Produksi Galian / hari = Tk x Q1 Qt 24.33
Kebutuhan tenaga :
- Pekerja P 8.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.3013
- Mandor = (Tk x M) : Qt (L03) 0.2877
Rp. 58,225.61 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.0
5 Faktor pengembangan bahan Fk 1.10
6 Berat volume kayu D1 1.50
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. Mesin potong kayu (chainsaw)
Memotong diperkirakan = 0.50 jam per m2 0.50
3. TENAGA
Produksi menentukan : alat bantu Q3 3.80
Produksi Galian / hari = Tk x Q1 Qt 26.63
Kebutuhan tenaga :
- Pekerja P 8.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.1025
- Mandor = (Tk x M) : Qt (L03) 0.2628
Rp. 102,441.97 / M3
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
jam PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.6 (1)
JENIS PEKERJAAN : Fondasi Cerucuk Penyedian d
SATUAN PEMBAYARAN : M1
NO. KOMPONEN
M1
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
Lumpsum
B. BAHAN
M1 1. Cerucuk M61
orang
orang
orang
C. PERALATAN
1 Alat Bantu
jam
jam
jam
Analisa EI-762
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
jam ……………………………………
MM PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.6 (2)
JENIS PEKERJAAN :Dinding Turap Kayu Tanpa Pen
SATUAN PEMBAYARAN : M1
NO. KOMPONEN
M1
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
Lumpsum
JUMLAH HARGA T
B. BAHAN
M1 1. Cerucuk M61
orang
orang
orang
JUMLAH HARGA
C. PERALATAN
1. Alat Bantu
jam
jam
jam
Analisa EI-763
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
jam ……………………………………
MM PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.6 (3)
JENIS PEKERJAAN : Dinding Turap Kayu Dengan P
SATUAN PEMBAYARAN : M1
NO. KOMPONEN
M1
liter A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
Lumpsum
JUMLAH HARGA T
B. BAHAN
orang
orang
orang
JUMLAH HARGA
C. PERALATAN
1. Alat Bantu
jam
jam
jam
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
Km ITEM PEMBAYARAN NO. : 7.6 (4)
jam JENIS PEKERJAAN : Dinding Turap Baja
mm SATUAN PEMBAYARAN : M1
mm
kg
M
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
Kg
Kg B. BAHAN
Dos
1. Turap baja M52
2. Plat Baja M48
3. Kawat Las M51
batang
Km/Jam
Km/Jam
menit C. PERALATAN
menit
menit 1. Trailer E29
menit 2. Crane 1 E07
3. Crane 2 E07
M' 4. Welding Set E32
Kg 5. Alat Bantu
Jam
batang
- D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT
menit F. HARGA SATUAN PEKERJAAN ( D + E )
menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
menit berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
M' dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
jam 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
batang
-
menit
menit
menit
M'
jam
M
jam
M/Jam
Lumpsum
batang
M
Kg
orang
orang
orang
jam
jam
jam
Analisa EI-768a
ebal 10 mm
IAN ANALISA HARGA SATUAN FORMULIR STANDAR UN
PEREKAMAN ANALISA MASING-MASIN
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
Km PROP / KAB / KODYA : ……………………………………
jam ITEM PEMBAYARAN NO. : 7.6 (8) a
mm JENIS PEKERJAAN :Penyediaan Tiang Pancang Ba
mm SATUAN PEMBAYARAN : M1
kg
M
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
JUMLAH HARGA T
Kg
Kg B. BAHAN
batang
Km/Jam
Km/Jam JUMLAH HARGA
menit C. PERALATAN
menit
menit 1. Trailer E29
menit 2. Crane E07
3. Welding Set E32
Kg 4 Alat Bantu
Jam
M
jam
jam
SATUAN KETERANGAN
Lumpsum
batang
M
Kg
orang
orang
orang
jam
jam
jam
Analisa EI-768b
ebal … mm
IAN ANALISA HARGA SATUAN FORMULIR STANDAR UN
PEREKAMAN ANALISA MASING-MASIN
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
Km PROP / KAB / KODYA : ……………………………………
jam ITEM PEMBAYARAN NO. : 7.6 (8) b
mm JENIS PEKERJAAN : Penyediaan Tiang Pancang Ba
mm SATUAN PEMBAYARAN :M1
kg
M
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
JUMLAH HARGA T
Kg
Kg B. BAHAN
batang
Km/Jam
Km/Jam JUMLAH HARGA
menit C. PERALATAN
menit
menit 1. Trailer E29
menit 2. Crane E07
3. Welding Set E32
Kg 4 Alat Bantu
Jam
M
jam
jam
SATUAN KETERANGAN
Lumpsum
batang
M
Kg
orang
orang
orang
jam
jam
jam
Analisa EI-768c
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
Km PROP / KAB / KODYA : ……………………………………
jam ITEM PEMBAYARAN NO. : 7.6 (8) c
mm asumsi JENIS PEKERJAAN : Penyediaan Tiang Pancang Ba
mm SATUAN PEMBAYARAN : M1
kg
M
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
JUMLAH HARGA T
Kg
Kg B. BAHAN
Km/Jam
Km/Jam JUMLAH HARGA
menit C. PERALATAN
menit
menit 1. Trailer E29
menit 2. Crane E07
3. Welding Set E32
Kg 4 Alat Bantu
Jam
M
jam
jam
SATUAN KETERANGAN
Lumpsum
batang
M
Kg
orang
orang
orang
jam
jam
jam
Analisa EI-7613
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
jam ITEM PEMBAYARAN NO. : 7.6 (13)
M JENIS PEKERJAAN : Pemancangan Tiang Pancang
SATUAN PEMBAYARAN :M1
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
JUMLAH HARGA T
B. BAHAN
Titik
-
menit
menit
menit
menit
JUMLAH HARGA
M1
C. PERALATAN
Jam
1. Pile Driver E30
2. Alat Bantu
Lumpsum
M'
JUMLAH HARGA PER
orang
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
Analisa EI-7614a
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
jam PROP / KAB / KODYA : ……………………………………
M ITEM PEMBAYARAN NO. : 7.6 (14) a
JENIS PEKERJAAN : Pemancangan Tiang Pancang
SATUAN PEMBAYARAN :M1
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
JUMLAH HARGA T
B. BAHAN
Titik
-
menit
menit
menit
menit
JUMLAH HARGA
M1/jam
C. PERALATAN
Jam
1. Pile Driver E30
2. Alat Bantu
Lumpsum
SATUAN KETERANGAN
Analisa EI-7614b
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
jam PROP / KAB / KODYA : ……………………………………
M ITEM PEMBAYARAN NO. : 7.6 (14) b
JENIS PEKERJAAN : Pemancangan Tiang Pancang
SATUAN PEMBAYARAN :M1
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
JUMLAH HARGA T
B. BAHAN
Titik
-
menit
menit
menit
menit
JUMLAH HARGA
M1/jam
C. PERALATAN
Jam
1. Pile Driver E30
2. Alat Bantu
Lumpsum
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
jam ……………………………………
MM PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.6 (6)
JENIS PEKERJAAN : Penyediaan Tiang Pancang Ka
SATUAN PEMBAYARAN : M1
NO. KOMPONEN
M1
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
Lumpsum
JUMLAH HARGA T
B. BAHAN
M1 1. Cerucuk M61
orang
orang
orang
JUMLAH HARGA
C. PERALATAN
1. Alat Bantu
jam
jam
jam
Analisa EI-766
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
jam ……………………………………
MM PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.6 (7)
JENIS PEKERJAAN : Penyediaan Tiang Pancang Ka
SATUAN PEMBAYARAN : M1
NO. KOMPONEN
M1
liter A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
Lumpsum
JUMLAH HARGA T
B. BAHAN
orang
orang
orang
JUMLAH HARGA
C. PERALATAN
1. Alat Bantu
jam
jam
jam
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.9.(1)
KM JENIS PEKERJAAN : Pasangan Batu
jam SATUAN PEMBAYARAN : M3
% Spec.
% Spec.
% NO. KOMPONEN
%
ton/M3
ton/M3 A. TENAGA
ton/M3
ton/M3 1. Pekerja Biasa (L01)
ton/M3 2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
M3 Lepas
M3
Kg
M3 C. PERALATAN
menit
menit
menit
menit
menit
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
M3 E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
M3 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
M3 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
- 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
liter/menit yang dibayar dari kontrak) dan biaya-biaya lainnya.
M3
jam
SATUAN KETERANGAN
M3/Jam
M3
orang
orang
orang
jam
jam
jam
Analisa EI-7101
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.10 (1)
KM JENIS PEKERJAAN : Pasangan Batu Kosong Yang D
jam SATUAN PEMBAYARAN : M3
- Spec.
Kg/M3 Spec.
Kg/M3 Spec.
- Spec. NO. KOMPONEN
%
%
%
A. TENAGA
T/M3
T/M3 1. Pekerja Biasa (L01)
T/M3 2. Tukang (L02)
T/M3 3. Mandor (L03)
%
%
B. BAHAN
Zak
M3 C. PERALATAN
M3 Agregat Kasar
M3 1. Conc. Mixer (E06)
2. Water Tanker (E23)
3. Alat Bantu
liter
-
menit
menit
menit
menit D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
menit E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
M3 Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
M3 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
M3 yang dibayar dari kontrak) dan biaya-biaya lainnya.
-
liter/menit
M3
jam
SATUAN KETERANGAN
M3
orang
orang
orang
jam
jam
jam
Analisa LI-7102
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.10 (2)
KM JENIS PEKERJAAN : Pasangan Batu Kosong
jam SATUAN PEMBAYARAN : M3
-
NO. KOMPONEN
A. TENAGA
jam
jam
jam C. PERALATAN
1. Alat Bantu
Analisa LI-7103a
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.10.(3) a.
KM JENIS PEKERJAAN : Bronjong dengan kawat yang d
jam SATUAN PEMBAYARAN : M3
-
NO. KOMPONEN
A. TENAGA
B. BAHAN
M3
orang
orang C. PERALATAN
orang
1. Alat Bantu
jam
jam
jam
Analisa EI-713
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.13.(1)
KM JENIS PEKERJAAN : Sandaran (Railing)
jam SATUAN PEMBAYARAN : M1
NO. KOMPONEN
A. TENAGA
M 1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
M
1. Pipa d = 8.91 cm Galvanised
2. Dudukan, mur, baut dll
orang
orang JUMLAH HARGA
orang
C. PERALATAN
jam
jam 1. Alat bantu
jam
Analisa EI-7141
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.14.(1)
KM JENIS PEKERJAAN : Papan Nama Jembatan
jam SATUAN PEMBAYARAN : buah
NO. KOMPONEN
A. TENAGA
M2 1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
B. BAHAN
Buah
1. Marmer
2. Adukan Semen
orang
orang JUMLAH HARGA
orang
C. PERALATAN
jam
jam 1. Alat bantu
jam
Analisa EI-7152
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UN
PEREKAMAN ANALISA MASING-MASIN
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
Jam ITEM PEMBAYARAN NO. : 7.15.(2)
- JENIS PEKERJAAN : Pembongkaran Beton
Ton/M3 SATUAN PEMBAYARAN : M3
NO. KOMPONEN
Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
Menit/M3 (padat)
B. BAHAN
M3
jam
M3
Menit
M3 (padat) C. PERALATAN
1. Compressor E05
jam 2. Jack Hammer E26
3. Wheel Loader E15
4. Dump Truck E08
M3 5 Alat bantu
-
KM/Jam
KM/Jam
menit
menit
menit
menit D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
menit E. OVERHEAD & PROFIT
menit F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
berat untuk bahan-bahan.
M3 padat 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
Jam 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Lump Sump
SATUAN KETERANGAN
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-7155
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………
Jam ITEM PEMBAYARAN NO. : 7.15.(5)
- JENIS PEKERJAAN : Pembongkaran Rangka Baja
SATUAN PEMBAYARAN : M2
NO. KOMPONEN
Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
(E05/26/10/15)
M2 / Jam
Jam
M3
- C. PERALATAN
KM/Jam 1. Compressor E05
KM/Jam 2. Jack Hammer E26
menit 3. Wheel Loader E15
menit 4. Dump Truck E08
menit 5 Alat bantu
menit
menit
menit
M3 / Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Jam Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
Lump Sump dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
M3/Jam
M3
orang
orang
Berlanjut ke halaman berikut
Analisa EI-7155
SATUAN KETERANGAN
Jam
Jam
Analisa EI-7156
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
Jam ITEM PEMBAYARAN NO. : 7.15.(6)
- JENIS PEKERJAAN : Pembongkaran Balok Baja (St
SATUAN PEMBAYARAN : M'
NO. KOMPONEN
Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
(E05/26/10/15)
M / Jam
Jam
TON
- C. PERALATAN
KM/Jam 1. Crane E07
KM/Jam 2. Trailer 20 ton E29
menit 3. Alat bantu
menit
menit
menit
menit
menit
M3 / Jam
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Jam Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
Lump Sump dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
M3/Jam
M3
orang
orang
SATUAN KETERANGAN
Jam
Jam
Analisa EI-7616
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
jam PROP / KAB / KODYA : ……………………………………
M ITEM PEMBAYARAN NO. : 7.6 (16)
JENIS PEKERJAAN : Pemancangan Tiang Pancang
SATUAN PEMBAYARAN : M1
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
JUMLAH HARGA T
B. BAHAN
Titik
-
menit
menit
menit
menit JUMLAH HARGA
M1/jam C. PERALATAN
SATUAN KETERANGAN
Analisa EI-7619a
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
KM ITEM PEMBAYARAN NO. : 7.6 (19) a
jam JENIS PEKERJAAN :Tiang Bor Beton, diameter 800
M SATUAN PEMBAYARAN : M1
M
Kg/M3
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
M3 JUMLAH HARGA T
Kg
M2 B. BAHAN
M1
Jam
JUMLAH HARGA PER
Lumpsum
SATUAN KETERANGAN
M'/jam
orang
orang
orang
jam
jam
jam
Analisa EI-7619b
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
KM ITEM PEMBAYARAN NO. : 7.6 (19) b
jam JENIS PEKERJAAN :Tiang Bor Beton, diameter …..
M SATUAN PEMBAYARAN : M1
M asumsi
Kg/M3
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
M3 JUMLAH HARGA T
Kg
M2 B. BAHAN
M1
Jam
JUMLAH HARGA PER
Lumpsum
SATUAN KETERANGAN
M'/jam
orang
orang
orang
jam
jam
jam
Analisa EI-765
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
m PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.6 (5)
KM JENIS PEKERJAAN :Dinding Turap Beton
jam SATUAN PEMBAYARAN : M1
M
M
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
M3
Kg B. BAHAN
Kg
1. Beton Pracetak K 350 (M72)
2. Joint Sealent (M94)
3. Plat Baja M48
Ton
Km/Jam
Km/Jam C. PERALATAN
M2 BJ Beton kira2
M3 2.4 T/m3
Jam
M2
-
menit
menit
menit
M1
Jam
Lumpsum
Berlanjut ke hal. berikut.
Analisa EI-765
SATUAN KETERANGAN
M2
M3
M3
orang
orang
orang
jam
jam
jam
Analisa EI-7620
d 7.6.(18) bila Tiang Pancang dikerjakan
FORMULIR STANDAR UN
PEREKAMAN ANALISA MASING-MASIN
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.6 (20)
jam JENIS PEKERJAAN : Tambahan Biaya untuk Nomor
SATUAN PEMBAYARAN : M1
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
M3 JUMLAH HARGA T
B. BAHAN
M'
M'
Jam
Lanjutan
SATUAN KETERANGAN
Jam
Lumpsum
M'/jam
orang
orang
orang
jam
jam
jam
Analisa EI-7624
a Tiang Bor Beton dikerjakan
FORMULIR STANDAR UN
PEREKAMAN ANALISA MASING-MASIN
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.6 (21)
jam JENIS PEKERJAAN : Tambahan Biaya untuk Nomor
SATUAN PEMBAYARAN : M1
NO. KOMPONEN
A. TENAGA
1. Pekerja (L01)
2. Tukang (L02)
3. Mandor (L03)
M3 JUMLAH HARGA T
B. BAHAN
M'
M'
Jam
Lanjutan
SATUAN KETERANGAN
Jam
Lumpsum
M'/jam
orang
orang
orang
jam
jam
jam
Analisa EI-7151
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
Jam ITEM PEMBAYARAN NO. : 7.15.(1)
- JENIS PEKERJAAN :Pembongkaran Pasangan Batu
Ton/M3 SATUAN PEMBAYARAN : M3
NO. KOMPONEN
Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
Menit/M3 (padat)
B. BAHAN
M3
jam
M3
Menit
M3 (padat) C. PERALATAN
SATUAN KETERANGAN
Lump Sump
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-7153
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………
PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.15.(3)
Jam JENIS PEKERJAAN :Pembongkaran Beton Pratekan
- SATUAN PEMBAYARAN : M3
NO. KOMPONEN
Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
(E05/26/10/15)
M3 / Jam
Jam
M3 C. PERALATAN
- 1. Compressor E05
KM/Jam 2. Jack Hammer E26
KM/Jam 3. Wheel Loader E15
menit 4. Dump Truck E08
menit 5 Alat bantu
menit
menit
menit
menit
SATUAN KETERANGAN
Lump Sump
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-7154
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………
PROP / KAB / KODYA : ……………………………………
ITEM PEMBAYARAN NO. : 7.15 (4)
Jam JENIS PEKERJAAN : Pembongkaran Bangunan Ged
- SATUAN PEMBAYARAN : M2
NO. KOMPONEN
Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN
(E05/26/10/15)
M3 / Jam
Jam
M3 C. PERALATAN
- 1. Compressor E05
KM/Jam 2. Jack Hammer E26
KM/Jam 3. Wheel Loader E15
menit 4. Dump Truck E08
menit 5 Alat bantu
menit
menit
menit
menit
SATUAN KETERANGAN
Lump Sump
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-7151
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
Jam ITEM PEMBAYARAN NO. : 7.15 (7)
- JENIS PEKERJAAN : Pembongkaran Lantai Jembat
Ton/M3 SATUAN PEMBAYARAN : M2
NO. KOMPONEN
Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
Menit/M3 (padat)
B. BAHAN
M3
jam
M3
Menit
M3 (padat) C. PERALATAN
SATUAN KETERANGAN
Lump Sump
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-7151
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
Jam ITEM PEMBAYARAN NO. : 7.15 (8)
- JENIS PEKERJAAN : Pembongkaran Jembatan Kay
Ton/M3 SATUAN PEMBAYARAN : M2
NO. KOMPONEN
Km
A. TENAGA
1. Pekerja (L01)
2. Mandor (L03)
jam
B. BAHAN
M2
-
menit
menit
menit
menit
(padat) C. PERALATAN
jam 1 Chain Saw E07
2 Crane E07
3 Dump Truck E08
M3 4 Alat bantu
-
KM/Jam
KM/Jam
menit
menit
menit
menit D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
menit E. OVERHEAD & PROFIT
menit F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
berat untuk bahan-bahan.
M3 padat 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
Jam 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
Lump Sump
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-761
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Fondasi Cerucuk Penyedian dan Pemanc TOTAL HARGA (Rp.) : 36,234.08
% THD. BIAYA PROYEK : 0.00
Analisa EI-762
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Dinding Turap Kayu Tanpa Pengawetan TOTAL HARGA (Rp.) : 42,562.10
% THD. BIAYA PROYEK : 0.00
ERALATAN ( A + B + C ) 37,010.52
15.0 % x D 5,551.58
42,562.10
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-763
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Dinding Turap Kayu Dengan Pengawetan TOTAL HARGA (Rp.) : 36,070.21
% THD. BIAYA PROYEK : 0.00
ERALATAN ( A + B + C ) 31,365.40
15.0 % x D 4,704.81
36,070.21
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Dinding Turap Baja TOTAL HARGA (Rp.) : 21,815.01
% THD. BIAYA PROYEK : 0.00
ERALATAN ( A + B + C ) 18,969.57
15.0 % x D 2,845.44
21,815.01
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
ERALATAN ( A + B + C ) 69,187.30
15.0 % x D 10,378.09
79,565.39
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Penyediaan Tiang Pancang Baja Diamete TOTAL HARGA (Rp.) : 79,565.39
% THD. BIAYA PROYEK : 0.00
ERALATAN ( A + B + C ) 69,187.30
15.0 % x D 10,378.09
79,565.39
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Penyediaan Tiang Pancang Baja DiameterTOTAL HARGA (Rp.) : 91,286.85
% THD. BIAYA PROYEK : 0.01
ERALATAN ( A + B + C ) 79,379.87
15.0 % x D 11,906.98
91,286.85
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Pemancangan Tiang Pancang Kayu Ukur TOTAL HARGA (Rp.) : 49,619.29
0 % THD. BIAYA PROYEK : 0.00
ERALATAN ( A + B + C ) 43,147.21
15.0 % x D 6,472.08
49,619.29
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Pemancangan Tiang Pancang Baja DiameTOTAL HARGA (Rp.) : 16,539.76
(Dia 500 mm) % THD. BIAYA PROYEK : 0.00
ERALATAN ( A + B + C ) 14,382.40
15.0 % x D 2,157.36
16,539.76
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Pemancangan Tiang Pancang Baja DiameTOTAL HARGA (Rp.) : 16,539.76
0 % THD. BIAYA PROYEK : 0.00
ERALATAN ( A + B + C ) 14,382.40
15.0 % x D 2,157.36
16,539.76
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Penyediaan Tiang Pancang Kayu Tanpa TOTAL HARGA (Rp.) : 42,562.10
% THD. BIAYA PROYEK : 0.00
ERALATAN ( A + B + C ) 37,010.52
15.0 % x D 5,551.58
42,562.10
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-767
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Penyediaan Tiang Pancang Kayu dengan TOTAL HARGA (Rp.) : 28,882.71
% THD. BIAYA PROYEK : 0.00
ERALATAN ( A + B + C ) 25,115.40
15.0 % x D 3,767.31
28,882.71
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Pasangan Batu TOTAL HARGA (Rp.) : 420,823.04
% THD. BIAYA PROYEK : 0.03
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Pasangan Batu Kosong Yang Diisi AdukanTOTAL HARGA (Rp.) : 385,824.69
% THD. BIAYA PROYEK : 0.02
ERALATAN ( A + B + C ) 335,499.73
15.0 % x D 50,324.96
385,824.69
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Pasangan Batu Kosong TOTAL HARGA (Rp.) : 215,058.08
% THD. BIAYA PROYEK : 0.01
ERALATAN ( A + B + C ) 187,007.03
15.0 % x D 28,051.05
215,058.08
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa LI-7103a
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Bronjong dengan kawat yang dilapisi galvaTOTAL HARGA (Rp.) : 361,806.70
% THD. BIAYA PROYEK : 0.02
ERALATAN ( A + B + C ) 314,614.53
15.0 % x D 47,192.18
361,806.70
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Sandaran (Railing) TOTAL HARGA (Rp.) : 15,263.55
% THD. BIAYA PROYEK : 0.00
ERALATAN ( A + B + C ) 13,272.65
15.0 % x D 1,990.90
15,263.55
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-7141
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Papan Nama Jembatan TOTAL HARGA (Rp.) : 133,597.11
% THD. BIAYA PROYEK : 0.01
ERALATAN ( A + B + C ) 116,171.40
15.0 % x D 17,425.71
133,597.11
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-7152
FORMULIR STANDAR UNTUK
N ANALISA MASING-MASING HARGA SATUAN
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Pembongkaran Beton TOTAL HARGA (Rp.) : 278,637.94
% THD. BIAYA PROYEK : 0.02
(Rp.) (Rp.)
ERALATAN ( A + B + C ) 242,293.86
15.0 % x D 36,344.08
278,637.94
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
(Rp.) (Rp.)
ERALATAN ( A + B + C ) 168,417.08
15.0 % x D 25,262.56
193,679.64
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Pembongkaran Balok Baja (Steel StringersTOTAL HARGA (Rp.) : 104,980.00
% THD. BIAYA PROYEK : 0.01
(Rp.) (Rp.)
ERALATAN ( A + B + C ) 91,286.96
15.0 % x D 13,693.04
104,980.00
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. :
Pemancangan Tiang Pancang Beton . ukura
TOTAL HARGA (Rp.) :
( 40 x 40 ) cm % THD. BIAYA PROYEK :
ERALATAN ( A + B + C ) 15,785.21
15.0 % x D 2,367.78
18,152.99
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
ERALATAN ( A + B + C ) 1,079,275.51
15.0 % x D 161,891.33
1,241,166.84
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Tiang Bor Beton, diameter ….. mm TOTAL HARGA (Rp.) : 1,930,929.89
% THD. BIAYA PROYEK : 0.12
ERALATAN ( A + B + C ) 1,679,069.47
15.0 % x D 251,860.42
1,930,929.89
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Dinding Turap Beton TOTAL HARGA (Rp.) : 399,522.32
% THD. BIAYA PROYEK : 0.02
ERALATAN ( A + B + C ) 347,410.71
15.0 % x D 52,111.61
399,522.32
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Tambahan Biaya untuk Nomor Mata Pembaya
TOTAL HARGA (Rp.) : 2,046.79
% THD. BIAYA PROYEK : 0.00
ERALATAN ( A + B + C ) 1,779.82
15.0 % x D 266.97
2,046.79
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Tambahan Biaya untuk Nomor Mata Pembaya
TOTAL HARGA (Rp.) : 9,622.44
% THD. BIAYA PROYEK : 0.00
ERALATAN ( A + B + C ) 8,367.34
15.0 % x D 1,255.10
9,622.44
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Pembongkaran Pasangan Batu TOTAL HARGA (Rp.) : 148,526.51
% THD. BIAYA PROYEK : 0.01
(Rp.) (Rp.)
ERALATAN ( A + B + C ) 129,153.49
15.0 % x D 19,373.02
148,526.51
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Pembongkaran Beton Pratekan TOTAL HARGA (Rp.) : 152,189.22
% THD. BIAYA PROYEK : 0.01
(Rp.) (Rp.)
ERALATAN ( A + B + C ) 132,338.45
15.0 % x D 19,850.77
152,189.22
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Pembongkaran Bangunan Gedung TOTAL HARGA (Rp.) : 56,473.28
% THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
ERALATAN ( A + B + C ) 49,107.20
15.0 % x D 7,366.08
56,473.28
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Pembongkaran Lantai Jembatan Kayu TOTAL HARGA (Rp.) : 58,225.61
% THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
ERALATAN ( A + B + C ) 50,630.96
15.0 % x D 7,594.64
58,225.61
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
………………………………………………
…………………………………………………………………..
………………………………………………………………….
………………………………………………
PERKIRAAN VOL. PEK. : 1.00
Pembongkaran Jembatan Kayu TOTAL HARGA (Rp.) : 102,441.97
% THD. BIAYA PROYEK : 0.01
(Rp.) (Rp.)
ERALATAN ( A + B + C ) 89,079.97
15.0 % x D 13,362.00
102,441.97
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7
5 Tebal lapis agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Proporsi Campuran : - Agregat Pecah Kasar APK 69.85
- Aggregat Halus Lapis pondasi A PU 30.15
9 Berat Isi Agregat (lepas) Bil 1.51
10 Faktor kehilangan - Agregat Pecah Kasar Fh1 1.05
- Aggregat Halus Lapis pondasi A Fh2 1.05
II. URUTAN KERJA
1 Wheel Loader mencampur & memuat Agregat ke
dalam Dump Truck di Base Camp
2 Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar secara manual
3 Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Pedestrian Roller
4 Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu
1. BAHAN
Agregat Pecah Kasar = 1 M3 x (Bip/Bil) x Fh1 1.26
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45
TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10
Produksi agregat / hari = Tk x Q1 Qt 987.70
Kebutuhan tenaga :
- Pekerja P 25.00
- Mandor M 1.00
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1772
- Mandor = (Tk x M) : Qt (L03) 0.0071
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7
5 Tebal lapis agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 22.00
- Sirtu St 60.00
9 Berat volume agregat (lepas) Bil 1.51
- Agregat B Fh 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 0.45
Ts1 0.45
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10
Produksi agregat / hari = Tk x Q1 Qt 987.70
Kebutuhan tenaga :
- Pekerja P 15.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1063
- Mandor = (Tk x M) : Qt (L03) 0.0071
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7
5 Tebal lapis Agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Berat volume agregat (lepas) Bil 1.51
Ts1 0.45
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71
Produksi Agregat / hari = Tk x Q1 Qt 823.99
Kebutuhan tenaga :
- Pekerja P 15.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1274
- Mandor = (Tk x M) : Qt (L03) 0.0085
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan material Agregat Fh 1.10
7 Komposisi campuran (taksiran) :
- Agregat Kasar Ak 85.00
- Agregat Halus Ah 15.00
8 Berat jenis bahan :
- Agregat D1 1.80
9 Berat isi padat Bip 1.81
10 Berat volume agregat (lepas) Bil 1.51
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor efisiensi alat Fa 0.83
Waktu Siklus Ts1
- Menunggu, dan lain lain T1 0.45
Ts1 0.45
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 98.09
Ts1 x (Bip/Bil)
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 98.09
Produksi Lapen / hari = Q1 x Tk Qt 686.66
Kebutuhan tenaga :
- Pekerja P 16.00
- Mandor M 1.00
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1631
- Mandor = (Tk x M) / Qt (L03) 0.0102
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Tebal lapis agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00
- Sirtu St 64.00
9 Berat volume agregat (lepas) Bil 1.51
Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2 1.05
Faktor kehilangan - Sirtu Fh3 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 0.45
Ts1 0.45
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71
Produksi agregat / hari = Tk x Q1 Qt 823.99
Kebutuhan tenaga :
- Pekerja P 7.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt - 0.0595
- Mandor = (Tk x M) : Qt - 0.0085
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7
5 Tebal Lapis Hotmix padat untuk patching t 0.04
6 Jam kerja efektif per-hari Tk 7.00
7 Faktor kehilangan material : - Agregat Fh1 1.10
- Aspal Fh2 1.05
8 Komposisi campuran ATB :
- Coarse Agregat CA 55.00
- Fine Agregat FA 37.50
- Fraksi Filler FF 1.00
- Asphalt minimum 6 % As 6.50
9 Berat jenis bahan :
- ATB D1 2.30
- Coarse Agregat & Fine Agregat D2 1.80
- Fraksi Filler D3 2.00
- Asphalt D4 1.03
10 Jarak stock pile ke cold bin l 100.00
11 Faktor kembang Fk 1.20
3. TENAGA
Produksi menentukan : AMP Q6 18.04
Produksi ATB / hari = Tk x Q6 Qt 126.30
Kebutuhan tenaga :
- Pekerja P 20.00
- Mandor M 2.00
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 1.1084
- Mandor = (Tk x M) / Qt (L03) 0.1108
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Tebal rata2 Lapen t 0.055
6 Jam kerja efektif per-hari Tk 7.00
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10
- Aspal Fh2 1.05
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00
- Agregat Pengunci Ap 25.00
- Aspal : - Paska Agregat Pokok As1 5.20
As2 94.55
9 Berat jenis bahan :
- Agregat D1 1.80
- Aspal D2 1.01
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor efisiensi alat Fa 0.83
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45
Ts1 0.45
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 117.58
Produksi Lapen / hari = Q1 x Tk Qt 823.08
Kebutuhan tenaga :
- Pekerja P 20.00
- Mandor M 2.00
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1701
- Mandor = (Tk x M) / Qt (L03) 0.0170
I. ASUMSI
1 Menggunakan buruh dan alat (semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
4 Jam kerja efektif per-hari Tk 7.00
5 Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum Sa 19.00
- Kadar Aspal terhadap berat total campuran As 7.00
- Tebal nominal padat untuk patching t 0.04
6 Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil) D1 2.01
- Aspal (diambil) D2 1.00
- Agregat (diambil) D3 1.60
7 Faktor kembang campuran Fk 1.20
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1683
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 140.700
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : Ts1
- Memuat T1 0.50
- Mengaduk T2 1.00
- Menuang T3 0.30
- Tunggu, dll. T4 0.20
Ts1 2.00
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 10.375
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 72.63
Kebutuhan tenaga : - Mandor M 2.00
- Pekerja P 12.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1928
- Pekerja = (Tk x P) : Qt (L01) 1.1566
Rp. 1,149,178.25 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fh 1.10
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00
- Minyak Fluk / Pencair K 13.00
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.03
- Minyak Fluk / Minyak Tanah (Kerosene) D2 0.80
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 850.00
Faktor Efisiensi Alat Fa 0.83
Kapasitas pompa aspal pas 55.00
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 3,012.90
Produksi / hari = Tk x Q1 Qt 21,090.30
Kebutuhan tenaga :
- Pekerja P 10.00
- Mandor M 1.00
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (gebalan rumput) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 0.00
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.10
1. BAHAN
1.a. Gebalan Rumput = 1 M2 x Fh (M32) 1.1000
2. ALAT
2.a. ALAT BANTU
- Gerobak Dorong = 2 buah
- Tusuk Bambu = 5 buah / M2
- Pagar Tali = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 4.00
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700
- Tukang = (Tk x Tb) : Qt (L02) 0.1400
- Pekerja = (Tk x P) : Qt (L01) 0.2800
Rp. 7,493.56 / M2
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : di sepanjang jalan
3 Bahan dasar diterima seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.10
2. ALAT
2.a WATER TANK TRUCK (E23)
Volume tanki air V 4,000.00
Kebutuhan air Wc 185.00
Kapasitas pompa air pa 100.00
Faktor Efisiensi alat Fa 0.83
Kecepatan laju v 1,200.00
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 200.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 0.00
- Pekerja P 6.00
Koefisien Tenaga / M' :
- Mandor = (Tk x M) : Qt (L03) 0.0350
- Tukang = (Tk x Tb) : Qt (L02) 0.0000
- Pekerja = (Tk x P) : Qt (L01) 0.2100
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : di sepanjang jalan
3 Bahan dasar (semak/perdu) diterima seluruhnya di lokasi pekerjaan
1. BAHAN
1.a. - Semak/perdu (M32) 1.10
1.b. - Tanah humus setebal 20 cm mxx 0.22
1.c. - Pupuk mxx 0.25
2. ALAT
2.a. ALAT BANTU
- Pacul/sekop = 4 buah
- Gerobak Dorong = 1 buah
- Pagar Bambu/kayu = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 0.00
- Pekerja P 6.00
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700
- Tukang = (Tk x Tb) : Qt (L02) 0.0000
- Pekerja = (Tk x P) : Qt (L01) 0.4200
Rp. 7,263.13 / M2
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : di sepanjang jalan
3 Bahan dasar pohon dan bahan lainnya diterima di lokasi pekerjaan
4 ukuran lubang 0,5 x 0,5 x 0,5 m
1. BAHAN
1.a. - pohon (M32) 1.00
1.b. - Tanah humus setebal 20 cm mxx 0.22
1.c. - Pupuk mxx 0.50
2. ALAT
2.a. ALAT BANTU
- Pacul/sekop = 4 buah
- Gerobak Dorong = 1 buah
- Pagar Bambu/kayu = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 0.00
- Pekerja P 6.00
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700
- Tukang = (Tk x Tb) : Qt (L02) 0.0000
- Pekerja = (Tk x P) : Qt (L01) 0.4200
Rp. 6,860.63 / bh
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi jembatan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fk 1.10
6 Tebal plat jembatan 0.20
1. BAHAN
- Beton K300 0.22
- Baja tulangan (bila diperlukan)
2. ALAT
2.a. COMPRESSOR, JACK HAMMER & LOADER
Produksi per jam Q1 7.50
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 7.50
Produksi Galian / hari = Tk x Q1 Qt 52.50
Kebutuhan tenaga :
- Pekerja P 12.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.6000
- Mandor = (Tk x M) : Qt (L03) 0.1333
Rp. 63,662.61 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi jembatan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fk 1.10
6 Tebal Lantai Jembatan Kayu 0.10
1. BAHAN
- Kayu Klas I untuk 1 m2. 0.10
- Paku dan material lainnya 0.20
2. ALAT
3. TENAGA
Produksi menentukan : Q1 1.00
Produksi Penggembalian kondisi / hari = Tk x Q1 Qt 7.00
Kebutuhan tenaga :
- Pekerja P 4.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 4.0000
- Mandor = (Tk x M) : Qt (L03) 1.0000
Rp. 347,312.12 / M3
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : . . . . . . . . . . bulan
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi jembatan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fk 1.10
6 Pelapisan permukaan dengan cat anti karat 0.10
1. BAHAN
- Cat anti karat per meter persegi 0.60
- Ampelas dan material lainnya 2.00
2. ALAT
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.6667
- Mandor = (Tk x M) : Qt (L03) 0.6667
Rp. 44,532.25 / M3
I. ASUMSI
1. BAHAN
2 ALAT
Ts1 2.00
3. TENAGA
Produksi menentukan : ASPHALT FINISHER Q5 3,213.00
Produksi / hari = Tk x Q5 Qt 22,491.00
Kebutuhan tenaga :
- Pekerja P 20.00
- Mandor M 1.00
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0062
- Mandor = (Tk x M) / Qt (L02) 0.0003
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………………………
PROP / KAB / KODYA : ………………………………………………
MATA PEMBAYARAN NO. : 8.1 (1)
KM JENIS PEKERJAAN : Pondasi Agregat Kls. A Untuk -
M SATUAN PEMBAYARAN : M3 Pek. Minor
-
jam
% memenuhi Spec.
% NO. KOMPONEN SATUAN
ton/m3
A. TENAGA
B. BAHAN
M3
M3 C. PERALATAN
-
- 1. Wheel Loader E15 jam
2. Dump Truck E08 jam
menit panduan 3. Pedestrian Roller E24 jam
4. Water Tanker E23 jam
M3 5. Alat Bantu Ls
jam
jam
SATUAN KETERANGAN
KM/jam
M
lintasan
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
Analisa EI-812
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………………………
KM PROP / KAB / KODYA : ………………………………………………
M MATA PEMBAYARAN NO. : 8.1 (2)
- JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk -
jam SATUAN PEMBAYARAN : M3
% Gradasi harus
% memenuhi
% Spesifikasi
NO. KOMPONEN SATUAN
A. TENAGA
B. BAHAN
M3
M3
- C. PERALATAN
-
1. Wheel Loader E15 jam
menit 2. Dump Truck E08 jam
3. Pedestrian Roller E24 jam
menit 4. Water Tanker E23 jam
5. Alat Bantu Ls
M3
jam
jam
Berlanjut ke halaman berikut
Analisa EI-812
SATUAN KETERANGAN
KM/jam
M
lintasan
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
Analisa EI-813
Utk. Pek. Minor
URAIAN ANALISA HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………………………
KM PROP / KAB / KODYA : ………………………………………………
M ITEM PEMBAYARAN NO. : 8.1 (3)
- JENIS PEKERJAAN : Agregat Utk. Lapis Pond. Jalan - Tanpa
Jam
SATUAN PEMBAYARAN : M3
A. TENAGA
M3
-
-
menit
menit C. PERALATAN
SATUAN KETERANGAN
KM/jam
M
lintasan
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3 / Jam
M3
orang
orang
Jam
Jam
Analisa EI-814
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………………………
KM 8.725 PROP / KAB / KODYA : ………………………………………………
Jam 7 ITEM PEMBAYARAN NO. : 8.1 (4)
- 1.1 JENIS PEKERJAAN : Waterbound Macadam Utk. Pek. -
0 SATUAN PEMBAYARAN : M3
% 85
% 15
0
ton / M3 1.8 NO. KOMPONEN SATUAN
1.81
1.51
A. TENAGA
B. BAHAN
M3 1.5
- 0.85 C. PERALATAN
- 0.83
0 1. Wheel Loader E15 Jam
menit 0.45 2. Dump Truck E09 Jam
0 3. 3-Wheel Roller E16 Jam
menit 0.45 4. Alat BAntu Ls
0
M3 98.0943830571
Jam 0.0101942636
M3 11.1474090426
Jam 0.0897069441
SATUAN KETERANGAN
Km / Jam
M
M
lintasan
M
-
M3
M3
Jam
Lump Sum
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-512
URAIAN ANALISA HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………………………
KM ………………………………………………………………
M PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.1.(4)
jam JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas S untuk pe
% Gradasi harus SATUAN PEMBAYARAN : M3
% memenuhi
% Spesifikasi
ton/m3
NO. KOMPONEN SATUAN
A. TENAGA
B. BAHAN
1. Aggregat S M27 M3
M3
M3
- lepas C. PERALATAN
- kondisi sedang 1. Wheel Loader (E15) jam
2. Dump Truck (E08) jam
menit panduan 3. Motor Grader (E13) jam
menit 4. Tandem Roller (E17) jam
5. Water Tanker (E23) jam
M3 6. Alat Bantu Ls
jam
jam
Analisa EI-512
SATUAN KETERANGAN
M
M
-
KM/jam
lintasan 1 x pp
menit
menit
menit
M3
jam
KM/jam
M
lintasan
m
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
Analisa EI-512
SATUAN KETERANGAN
Analisa EI-815
SATUAN KETERANGAN
KM PROYEK :
M Rata-rata No. PAKET KONTRAK : ………………………………………………
Jam NAMA PAKET : ………………………………………………………………
- PROP / KAB / KODYA : ………………………………………………
- ITEM PEMBAYARAN NO. : 8.1 (5)
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Minor
% Gradasi harus - SATUAN PEMBAYARAN : M3
% memenuhi -
% Spesifikasi
%
NO. KOMPONEN SATUAN
ton / M3
ton / M3
ton / M3
ton / M3 A. TENAGA
m
1. Pekerja Biasa (L01) Jam
2. Mandor (L03) Jam
B. BAHAN
C. PERALATAN
M3 1. Wheel Loader E15 Jam
M3 2. AMP E01 Jam
Kg 3. Genset E12 Jam
Kg 4. Dump Truck E09 Jam
5. Pedestrian Roller E24 Jam
6. Alat Bantu Ls
M3
-
-
km/jam
km/jam D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT 15.0
menit F. HARGA SATUAN PEKERJAAN ( D + E )
menit Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
menit berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
M3 dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
Jam 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
ton / Jam
-
M3
Jam
M3
Jam
Ton
-
KM / Jam
KM / Jam
Ton
menit
menit
menit
menit
menit
menit
M3
Jam
Km / Jam
M
lintasan
-
M3
Jam
Lump Sum
M3 / Jam
M3
orang
orang
Jam
Jam
SATUAN KETERANGAN
Analisa EI-817
SATUAN KETERANGAN
KM PROYEK :
M No. PAKET KONTRAK : ………………………………………………
Jam NAMA PAKET : ………………………………………………………………
- PROP / KAB / KODYA : ………………………………………………
- ITEM PEMBAYARAN NO. : 8.1 (7)
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Minor
Kg/M2 SATUAN PEMBAYARAN : M3
Kg/M2
Kg/M2
Kg/M3 (As1 : t)
NO. KOMPONEN SATUAN
ton / M3
ton / M3
A. TENAGA
B. BAHAN
M3 C. PERALATAN
M3
Kg 1. Wheel Loader E15 Jam
2. Dump Truck E09 Jam
3. 3-Wheel Roller E16 Jam
4. Asp. Sprayer E03 Jam
5. Alat bantu Ls
M3
-
-
menit
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
menit E. OVERHEAD & PROFIT 15.0
F. HARGA SATUAN PEKERJAAN ( D + E )
M3 Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
Jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
ton 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
- yang dibayar dari kontrak) dan biaya-biaya lainnya.
KM / Jam
KM / Jam
SATUAN KETERANGAN
menit
menit
menit
menit
menit
M3
Jam
Km / Jam
M
lintasan
M
-
M3
M3
Jam
liter
-
liter/menit
kg/m3
m3
Jam
Lump Sum
M3/Jam
M3
orang
orang
Jam
Jam
SATUAN KETERANGAN
Analisa EI-818
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.1 (8)
KM JENIS PEKERJAAN : Camp. Aspal Dingin Utk.Pek.Minor
jam SATUAN PEMBAYARAN : M3
MM
%
M Rata-rata NO. KOMPONEN SATUAN
Ton/M3
Ton/M3
Ton/M3 A. TENAGA
diambil
1. Pekerja Biasa (L01) jam
2. Mandor (L03) jam
B. BAHAN
M3
Kg
C. PERALATAN
jam
SATUAN KETERANGAN
ton
-
KM / Jam
KM / Jam
M3
menit
menit
menit
menit
menit
menit
M3 Melayani 1 buah
molen
Jam
M3/Jam
M3
orang
orang
jam
jam
Analisa EI-819
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.1 (9)
KM JENIS PEKERJAAN : Residu Bitumen Untuk Pek.Minor
Jam SATUAN PEMBAYARAN : LITER
-
% 100 bagian
% 15 bagian NO. KOMPONEN SATUAN
Kg / Ltr
Kg / Ltr
A. TENAGA
B. BAHAN
1. Aspal (M10) Kg
2. Kerosene (M11) Liter
liter campuran
C. PERALATAN
Kg
liter 1. Asphalt Sprayer E03 Jam
2. Compresor E05 Jam
3. Dump Truck E09 Jam
liter
-
liter/menit
liter
liter
Jam
SATUAN KETERANGAN
liter
liter
orang
orang
Jam
Jam
Analisa LI-831
SATUAN KETERANGAN
KM
jam FORMULIR STANDAR UNTUK
- PEREKAMAN ANALISA MASING-MASING HARGA
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.3.(1)
M2 JENIS PEKERJAAN : Stabilisasi Dengan Tanaman
SATUAN PEMBAYARAN : M2
M2 A. TENAGA
orang
orang 1. Pekerja Biasa (L01) jam
orang 2. Tukang (L02) jam
3. Mandor (L03) jam
jam
jam
jam
B. BAHAN
C. PERALATAN
1. Alat Bantu Ls
SATUAN KETERANGAN
km
jam
- FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………………………
slip/m' PROP / KAB / KODYA : ………………………………………………
hari ITEM PEMBAYARAN NO. : 8.3.(1b)
JENIS PEKERJAAN : Stabilisasi dengan Tanaman VS
SATUAN PEMBAYARAN : M2
A. TENAGA
liter
liter/meter 1. Pekerja (L01) jam
liter/menit 2. Tukang (L02) jam
- 3. Mandor (L03) jam
m/jam
jam
B. BAHAN
1. Rumput M32 M2
M' 2 Tanah Liat m3
orang 3 Pupuk kg
orang
orang
jam
jam
jam C. PERALATAN
SATUAN KETERANGAN
A. TENAGA
jam
jam
jam
B. BAHAN
C. PERALATAN
1. Alat Bantu Ls
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.3.(3)
JENIS PEKERJAAN : Pohon
bh SATUAN PEMBAYARAN : Buah
m3
kg
A. TENAGA
jam
jam
jam
B. BAHAN
1. - pohon bh
- Tanah humus setebal 20 cm m3
- Pupuk kg
C. PERALATAN
1. Alat Bantu Ls
Jam
-
cm FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.5.(1)
JENIS PEKERJAAN : Pengembalian kondisi lantai jembatan b
SATUAN PEMBAYARAN : M2
m3
kg
NO. KOMPONEN SATUAN
(E05/26/10/15)
M3 / Jam
Jam A. TENAGA
B. BAHAN
M3/Jam
M3
orang
orang
Jam
Jam
C. PERALATAN
1. Compressor E05 Jam
2. Jack Hammer E26 Jam
3. Wheel Loader E15 Jam
4. Alat bantu Ls
SATUAN KETERANGAN
Jam
-
cm FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.5.(2)
JENIS PEKERJAAN : Pengembalian kondisi lantai jembatan
SATUAN PEMBAYARAN : M2
m3
kg
NO. KOMPONEN SATUAN
A. TENAGA
B. BAHAN
M2/Jam
M2/Hari 1. Kayu Klas I M3
2. Paku Kg
orang
orang
Jam
Jam
C. PERALATAN
1 Alat bantu Ls
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT 15.0
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
Analisa EI-851 yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
Jam
-
cm FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.5.(3)
JENIS PEKERJAAN : Pengembalian kondisi pelapisan permuk
SATUAN PEMBAYARAN : M2
kg
Lb
NO. KOMPONEN SATUAN
A. TENAGA
Jam
Jam
C. PERALATAN
1 Alat bantu Ls
SATUAN KETERANGAN
Km
Jam
- FORMULIR STANDAR UNTUK
Cm PEREKAMAN ANALISA MASING-MASING HARGA
% Total Campuran
% Total Campuran
% Total Campuran PROYEK :
% Total Campuran No. PAKET KONTRAK : ………………………………………………
% Total Modifier NAMA PAKET : ………………………………………………………………
% Total Modifier ………………………………………………………………
% Total Modifier PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.1 (6)
JENIS PEKERJAAN : Lasbutag untuk pekerjaan minor
T/m3 SATUAN PEMBAYARAN : M3
T/m3
T/m3
T/m3
T/m3 NO. KOMPONEN SATUAN
T/m3
T/m3
T/m3
A. TENAGA
B. BAHAN
C. PERALATAN
M3
M3 1. Wheel Loader (E15) Jam
M3 2. Dump Truck (E08) Jam
3. P. Tyre Roller (E18) Jam
4. Tnd. Roller (E17) Jam
5. Asp. Finisher (E02) Jam
6. Conc. Mixer (E06) Jam
7. Alat Bantu Ls
M3
-
-
menit lihat tabel
V - loading
menit
M3
Jam
Ton
-
KM / Jam
KM / Jam
menit
menit
menit
menit
menit
M3
Jam
Km/Jam Panduan
M
lintasan
M3
Jam
Km / Jam
M
lintasan
-
M3
Jam
m/menit
-
meter
M2
Jam
Analisa EI-811
SATUAN KETERANGAN
liter
-
menit
menit
menit
menit
menit
M3
jam
Lump Sum
M2
M2
orang
orang
Jam
Jam
Analisa EI-811
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
gregat Kls. A Untuk - TOTAL HARGA (Rp.) : 287,975.33
Pek. Minor % THD. BIAYA PROYEK : 0.02
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
gregat Kls. B Untuk - TOTAL HARGA (Rp.) : 296,751.07
Pek. Minor % THD. BIAYA PROYEK : 0.02
PERKIRAAN HARGA JUMLAH
KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
tk. Lapis Pond. Jalan - Tanpa TOTAL HARGA (Rp.) : 246,588.71
% THD. BIAYA PROYEK : 0.02
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
nd Macadam Utk. Pek. - TOTAL HARGA (Rp.) : 309,135.23
Minor % THD. BIAYA PROYEK : 0.02
……………………………………
………………………………………………………..
…………………………………………………….
……………………………………
PERKIRAAN VOL. PEK. : 1.00
dasi Agregat Kelas S untuk peTOTAL HARGA : 309,135.23
% THD. BIAYA PROYEK : 0.02
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
pal Panas Utk.Pek.Minor TOTAL HARGA (Rp.) : 1,803,522.21
% THD. BIAYA PROYEK : 0.11
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
Macadam Utk.Pek.Minor TOTAL HARGA : 1,097,582.43
(Perata) % THD. BIAYA PROYEK : 0.07
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
pal Dingin Utk.Pek.Minor TOTAL HARGA : 1,149,178.25
% THD. BIAYA PROYEK : 0.07
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
umen Untuk Pek.Minor TOTAL HARGA : 7,677.69
% THD. BIAYA PROYEK : 0.00
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
Dengan Tanaman TOTAL HARGA (Rp.) : 7,493.56
% THD. BIAYA PROYEK : 0.00
Analisa LI-831b
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
dengan Tanaman VS TOTAL HARGA (Rp.) : 8,264.43
% THD. BIAYA PROYEK : 0.00
Analisa LI-832
Analisa LI-833
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 6,860.63
% THD. BIAYA PROYEK : 0.00
Analisa EI-851
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
alian kondisi lantai jembatan bTOTAL HARGA (Rp.) : 63,662.61
% THD. BIAYA PROYEK : 0.00
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
alian kondisi lantai jembatan TOTAL HARGA (Rp.) : 347,312.12
% THD. BIAYA PROYEK : 0.02
(Rp.) (Rp.)
Analisa EI-851
……………………………………
………………………………………………………..
……………………………………
PERKIRAAN VOL. PEK. : 1.00
alian kondisi pelapisan permukTOTAL HARGA (Rp.) : 44,532.25
% THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
Analisa EI-641
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor Kehilangan Material Fh 1.05
7 Tebal lapisan cat secara manual t 0.015
8 Berat Jenis Bahan Cat BJ.Cat 1.00
9 Perbandingan pemakaian bahan : - Cat C 65
- Thinner T 35
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Beat ditaburkan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Thermoplastic = C x R x (BJ.Cat) (M17b) 1.9500
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500
1.c. Glass Bead (M34) 0.4500
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33
dibutuhkan tenaga : - Mandor M 1.00
- Tukang Cat Tb 3.00
- Pekerja P 8.00
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000
Rp. 114,790.83 / M2
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor Kehilangan Material Fh 1.05
7 Tebal lapisan cat secara manual t 0.0038
8 Berat Jenis Bahan Cat BJ.Cat 1.00
9 Perbandingan pemakaian bahan : - Cat C 65
- Thinner T 35
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Non Thermoplastic = C x R x (BJ.Cat) (M17a) 1.9500
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500
1.c. Blass Bead (M34) 0.4500
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33
dibutuhkan tenaga : - Mandor M 1.00
- Tukang Cat Tb 3.00
- Pekerja P 8.00
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000
ITEM PEMBAYARAN NO. : 8.4.(2)
JENIS PEKERJAAN : Marka Jalan Bukan Termoplastic
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HA
Rp. 103,578.33 / M2
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
1. BAHAN
1.a. Pelat Rambu Jadi (Engineering Grade) (M35a) 1.00
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00
1.c. Beton K-175 (M60) 0.016
1.d. Cat, dan bahan lainnya - 1.0000
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5
- Lain-lain = geser, atur, tunggu, dll. T4 30.0
Ts 139.4
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 45.20
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 3.00
- Pekerja P 5.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1549
- Tukang = (Tk x Tb) : Qt (L02) 0.4646
- Pekerja = (Tk x P) : Qt (L01) 0.7743
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
1. BAHAN
1.a. Pelat Rambu Jadi (Engineering Grade) (M35a) 2.00
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00
1.c. Beton K-175 (M60) 0.016
1.d. Cat, dan bahan lainnya - 1.0000
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5
- Lain-lain = geser, atur, tunggu, dll. T4 30.0
Ts 139.4
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 45.20
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 3.00
- Pekerja P 6.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1549
- Tukang = (Tk x Tb) : Qt (L02) 0.4646
- Pekerja = (Tk x P) : Qt (L01) 0.9292
1. BAHAN
1.a. Pelat Rambu Jadi (High Intensity Grade) (M35b) 1.00
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00
1.c. Beton K-175 (M60) 0.016
1.d. Cat, dan bahan lainnya - 1.0000
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5
- Lain-lain = geser, atur, tunggu, dll. T4 30.0
Ts 139.4
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 45.20
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 3.00
- Pekerja P 5.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1549
- Tukang = (Tk x Tb) : Qt (L02) 0.4646
- Pekerja = (Tk x P) : Qt (L01) 0.7743
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 45.20
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 3.00
- Pekerja P 5.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1549
- Tukang = (Tk x Tb) : Qt (L02) 0.4646
- Pekerja = (Tk x P) : Qt (L01) 0.7743
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok beton cetak, dll) diangkut dengan
Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
7 Tulangan praktis Rc 125.00
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 20.0
Faktor Efisiensi Alat Fa 0.83
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 20.0
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9
- Menurunkan = Rata-rata 1 menit / buah T3 20.0
- Lain-lain = geser, atur, tunggu, dll. T4 10.0
Ts 91.9
3. TENAGA
Produksi pasang patok pengarah / hari = Tk x Q1 Qt 75.88
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 8.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0922
- Tukang = (Tk x Tb) : Qt (L02) 0.3690
- Pekerja = (Tk x P) : Qt (L01) 0.7380
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
7 Tulangan praktis Rc 125.00
II. URUTAN KERJA
1 Tempat penanaman patok disiapkan / digali
2 Patok Kilometer ditanam ke dalam tanah dengan
elevasi puncak patok sesuai dgn. ketentuan dan dicat
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88
- Menurunkan = Rata-rata 1.5 menit / buah T3 22.5
- Lain-lain = geser, tunggu, dll T4 10.0
Ts 94.4
3. TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1 Qt 66.75
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 5.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1049
- Tukang = (Tk x Tb) : Qt (L02) 0.2097
- Pekerja = (Tk x P) : Qt (L01) 0.5243
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
7 Tulangan praktis Rc 125.00
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88
- Menurunkan = Rata-rata 1.5 menit / buah T3 22.5
- Lain-lain = geser, tunggu, dll T4 10.0
Ts 94.4
3. TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1 Qt 66.75
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 5.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1049
- Tukang = (Tk x Tb) : Qt (L02) 0.2097
- Pekerja = (Tk x P) : Qt (L01) 0.5243
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar rel pengaman diterima di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.00
7 Tulangan praktis Rc 50.00
2. ALAT
2,a DUMP TRUCK (E08) (E08)
Kapasitas 1 kali Angkut Cp 15.0
Waktu Siklus : Ts
- Memuat T1 50.0
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88
- Menurunkan T3 60.0
- Lain-lain T4 30.0
Ts 181.9
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar paku jalan diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fh 1.05
2. ALAT
3. TENAGA
Produksi pasang paku jalan/ hari = Tk x Q1 Qt 20.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 5.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.3500
- Tukang = (Tk x Tb) : Qt (L02) 0.7000
- Pekerja = (Tk x P) : Qt (L01) 1.7500
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar mata kucing diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fh 1.05
2. ALAT
3. TENAGA
Produksi pasang mata kucing/ hari = Tk x Q1 Qt 20.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 5.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.3500
- Tukang = (Tk x Tb) : Qt (L02) 0.7000
- Pekerja = (Tk x P) : Qt (L01) 1.7500
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan frontage
3 Bahan dasar ( blok beton ) telah berada di lokasi
pekerjaan / proyek
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
2. ALAT
2.a. TAMPER (E25)
Kecepatan V 0.60
Efisiensi alat Fa 0.83
Lebar pemadatan Lb 0.40
Banyak lintasan n 4
Tebal lapis hamparan rata-rata tp 0.05
3. TENAGA
Produksi paving block / hari = Tk x Q1 Qt 17.43
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 6.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.4016
- Tukang = (Tk x Tb) : Qt (L02) 1.6064
- Pekerja = (Tk x P) : Qt (L01) 2.4096
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak lama yang digunakan kembali
dipasang dengan mortar
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.10
7 Tulangan praktis Rc 0.00
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V2 500.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1 5.00
- Mengaduk T2 3.00
- Menuang T3 1.00
- Menunggu, dll. T4 1.00
Ts1 10.00
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 17.43
Kebutuhan tenaga : - Mandor M 0.50
- Tukang Tb 1.00
- Pekerja P 3.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.2008
- Tukang = (Tk x Tb) : Qt (L02) 0.4016
- Pekerja = (Tk x P) : Qt (L01) 1.2048
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 40.00
Waktu Siklus : Ts
- Memuat = naik & atur rata-rata 3 menit/m T1 26.67
- Angkut V=30 Km/jam = Lef x V x 60 T2 17.45
- Kembali V=50 Km/jam= Lef x V x 60 T3 10.47
- Menurunkan = Rata-rata 2 menit/m T4 40.00
- Lain-lain = geser, atur, tunggu dll T5 7.00
Ts 101.59
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 165.38
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 10.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0423
- Tukang = (Tk x Tb) : Qt (L02) 0.1693
- Pekerja = (Tk x P) : Qt (L01) 0.4233
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 36.00
Waktu Siklus : Ts
- Memuat = naik & atur rata-rata 3 menit/m T1 24.00
- Angkut V=30 Km/jam = Lef x V x 60 T2 17.45
- Kembali V=50 Km/jam= Lef x V x 60 T3 10.47
- Menurunkan = Rata-rata 2 menit/m T4 36.00
- Lain-lain = geser, atur, tunggu dll T5 7.00
Ts 94.92
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 159.29
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 10.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0439
- Tukang = (Tk x Tb) : Qt (L02) 0.1758
- Pekerja = (Tk x P) : Qt (L01) 0.4394
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 36.00
Waktu Siklus : Ts
- Memuat = naik & atur rata-rata 3 menit/m T1 24.00
- Angkut V=30 Km/jam = Lef x V x 60 T2 17.45
- Kembali V=50 Km/jam= Lef x V x 60 T3 10.47
- Menurunkan = Rata-rata 2 menit/m T4 36.00
- Lain-lain = geser, atur, tunggu dll T5 7.00
Ts 94.92
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 159.29
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 10.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0439
- Tukang = (Tk x Tb) : Qt (L02) 0.1758
- Pekerja = (Tk x P) : Qt (L01) 0.4394
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 32.00
Waktu Siklus : Ts
- Memuat = naik & atur rata-rata 3 menit/m T1 21.33
- Angkut V=30 Km/jam = Lef x V x 60 T2 17.45
- Kembali V=50 Km/jam= Lef x V x 60 T3 10.47
- Menurunkan = Rata-rata 2 menit/m T4 32.00
- Lain-lain = geser, atur, tunggu dll T5 7.00
Ts 88.25
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 152.29
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 10.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0460
- Tukang = (Tk x Tb) : Qt (L02) 0.1839
- Pekerja = (Tk x P) : Qt (L01) 0.4597
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 32.00
Waktu Siklus : Ts
- Memuat = naik & atur rata-rata 3 menit/m T1 21.33
- Angkut V=30 Km/jam = Lef x V x 60 T2 17.45
- Kembali V=50 Km/jam= Lef x V x 60 T3 10.47
- Menurunkan = Rata-rata 2 menit/m T4 32.00
- Lain-lain = geser, atur, tunggu dll T5 7.00
Ts 88.25
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 152.29
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 10.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0460
- Tukang = (Tk x Tb) : Qt (L02) 0.1839
- Pekerja = (Tk x P) : Qt (L01) 0.4597
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 32.00
Waktu Siklus : Ts
- Memuat = naik & atur rata-rata 3 menit/m T1 21.33
- Angkut V=30 Km/jam = Lef x V x 60 T2 17.45
- Kembali V=50 Km/jam= Lef x V x 60 T3 10.47
- Menurunkan = Rata-rata 2 menit/m T4 32.00
- Lain-lain = geser, atur, tunggu dll T5 7.00
Ts 88.25
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 152.29
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 10.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0460
- Tukang = (Tk x Tb) : Qt (L02) 0.1839
- Pekerja = (Tk x P) : Qt (L01) 0.4597
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar kerb pracetak jenis-1 dibuat di base camp, kemudian
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.05
II. URUTAN KERJA
1 Tempat lokasi kerb pracetak disiapkan dg elevasi sesuai gambar
2 Semen, pasir dan air dicampur dan diaduk menjadi mortar dengan
menggunakan alat bantu, digunakan sbg dudukan kerb
3 Celah sambungan antar kerb harus diisi dengan mortar dg rapi
dan elevasi atas kerb harus rata
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 16.00
Waktu Siklus : Ts
- Memuat = naik & atur rata-rata 3 menit/m T1 10.67
- Angkut V=30 Km/jam = Lef x V x 60 T2 17.45
- Kembali V=50 Km/jam= Lef x V x 60 T3 10.47
- Menurunkan = Rata-rata 2 menit/m T4 16.00
- Lain-lain = geser, atur, tunggu dll T5 7.00
Ts 61.59
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 109.11
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 4.00
- Pekerja P 10.00
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0642
- Tukang = (Tk x Tb) : Qt (L02) 0.2566
- Pekerja = (Tk x P) : Qt (L01) 0.6415
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(1)
JENIS PEKERJAAN : Marka Jalan Termoplastik
KM SATUAN PEMBAYARAN : M2
jam
-
M Spec.10.4.3(2)(d)
Kg/Liter NO. KOMPONEN SATUAN
%
%
A. TENAGA
B. BAHAN
Kg
Liter 1. Cat Marka Thermoplastic M17b Kg
Kg 2. Minyak Pencair (Thinner) M33 Liter
3. Glass Bead M34 Kg
Ltr/Jam
Ltr/M2
C. PERALATAN
M2/Jam
1. Compressor E05 Jam
Jam 2. Dump Truck E08 Jam
3. Alat Bantu Ls
M2/Jam
Jam
jam
jam
jam
SATUAN KETERANGAN
Analisa EI-842
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(2)
KM JENIS PEKERJAAN : Marka Jalan Bukan Termoplastic
jam SATUAN PEMBAYARAN : M2
-
M Spec.10.4.3(2)(d)
Kg/Liter
% NO. KOMPONEN SATUAN
%
A. TENAGA
Kg B. BAHAN
Liter
Kg Spec.10.4.3(2)(e) 1. Cat Marka (M17a) Kg
2. Thinner (M33) Liter
3. Blass Bit (M34) Kg
Ltr/Jam
Ltr/M2
M2/Jam C. PERALATAN
M2/Jam
Jam
Ls
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT 15.0
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
M2 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
orang 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
orang 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
orang yang dibayar dari kontrak) dan biaya-biaya lainnya.
jam
jam
jam
Berlanjut ke hal. berikut.
Analisa EI-842
SATUAN KETERANGAN
Analisa LI-843a
ineering Grade
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARG
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(3) .(a)
JENIS PEKERJAAN : Rambu Jalan Tunggal dengan Permukaan
KM SATUAN PEMBAYARAN : BH
jam
A. TENAGA
Buah B. BAHAN
menit 1. Pelat Rambu (M35a) BH
menit 2. Pipa Galvanis Dia.1,6" (M24) Batang
menit 3. Beton K-175 (M60) M3
menit 4. Cat, dan bahan lainnya Ls
menit
Buah
C. PERALATAN
Jam
1. Dump Truck E08 Jam
2. Alat Bantu Ls
Buah
orang
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT 15.0
F. HARGA SATUAN PEKERJAAN ( D + E )
jam Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
Analisa LI-843b
neering Grade
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARG
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(3) .(b)
JENIS PEKERJAAN : Rambu Jalan Ganda dengan Permukaan P
KM SATUAN PEMBAYARAN : BH
jam
A. TENAGA
Buah B. BAHAN
Buah
C. PERALATAN
Jam
1. Dump Truck E08 Jam
2. Alat Bantu Ls
Buah
orang
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT 15.0
F. HARGA SATUAN PEKERJAAN ( D + E )
jam Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
Analisa LI-844a
h Intensity Grade
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARG
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(4) .(a)
JENIS PEKERJAAN : Rambu Jalan Tunggal dengan Permukaan
KM SATUAN PEMBAYARAN : BH
jam
A. TENAGA
Buah B. BAHAN
Buah
C. PERALATAN
Jam
1. Dump Truck E08 Jam
2. Alat Bantu Ls
Buah
orang
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT 15.0
F. HARGA SATUAN PEKERJAAN ( D + E )
jam Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
Analisa LI-844b
Intensity Grade
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARG
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(4) .(b)
KM JENIS PEKERJAAN : Rambu Jalan Ganda dengan Permukaan Pe
jam SATUAN PEMBAYARAN : BH
BH A. TENAGA
Batang
M3 1. Pekerja Biasa (L01) jam
Ls 2. Tukang (L02) jam
3. Mandor (L03) jam
Buah
menit B. BAHAN
menit
menit 1. Pelat Rambu (M35b) BH
menit 2. Pipa Galvanis Dia.1,6" (M24) Batang
menit 3. Beton K-175 (M60) M3
4. Cat, dan bahan lainnya Ls
Buah
Jam
C. PERALATAN
Buah
orang
orang
orang
jam
jam D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
jam E. OVERHEAD & PROFIT 15.0
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-845
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(5)
JENIS PEKERJAAN : Patok Pengarah
KM SATUAN PEMBAYARAN : BH
jam
-
Kg/M3
NO. KOMPONEN SATUAN
A. TENAGA
B. BAHAN
Buah
- 1. Beton K-175 (M60) M3
2. Baja Tulangan (M39) Kg
menit 3. Cat, dan material lainnya Ls
menit
menit
menit
menit
Buah C. PERALATAN
Buah
orang
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT 15.0
F. HARGA SATUAN PEKERJAAN ( D + E )
jam Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
Analisa EI-846a
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(6) .(a)
JENIS PEKERJAAN : Patok Kilometer
KM SATUAN PEMBAYARAN : BH
jam
-
Kg/M3
NO. KOMPONEN SATUAN
A. TENAGA
B. BAHAN
Buah C. PERALATAN
Buah
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT 15.0
orang F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Berlanjut ke hal. berikut.
Analisa EI-846a
SATUAN KETERANGAN
Analisa EI-846b
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(6) .(b)
JENIS PEKERJAAN : Patok Hektometer
KM SATUAN PEMBAYARAN : BH
jam
-
Kg/M3
NO. KOMPONEN SATUAN
A. TENAGA
B. BAHAN
Buah C. PERALATAN
Buah
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT 15.0
orang F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
Analisa EI-847
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(7)
Km ukuran JENIS PEKERJAAN : Rel Pengaman
jam sesuai SATUAN PEMBAYARAN : M'
- drawing
Kg/Cu.m
A. PEKERJA
B. BAHAN
M'
1. Rel Pengaman (M36) M'
menit 2. Patok Beton K-175 (M38) buah
menit 3. Baja Tulangan (M39)a buah
menit 4. Baut, dan material lain buah
menit
menit
M'
C. PERALATAN
SATUAN KETERANGAN
Analisa EI-848
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(8)
jam JENIS PEKERJAAN : Paku Jalan
- SATUAN PEMBAYARAN : BH
A. TENAGA
B. BAHAN
Buah
orang
orang
orang C. PERALATAN
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(9)
jam JENIS PEKERJAAN : Mata Kucing
- SATUAN PEMBAYARAN : BH
A. TENAGA
B. BAHAN
Buah
orang
orang C. PERALATAN
orang
1. Alat Bantu Ls
jam
jam
jam
Analisa EI-8412
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(12)
JENIS PEKERJAAN : Perkerasan Blok Beton pada Trotoar dan
KM SATUAN PEMBAYARAN : M2
jam
-
PERKIRAAN
NO. KOMPONEN SATUAN
A. TENAGA
1. Pekerja Biasa (L01) jam
2. Tukang (L02) jam
M2 3. Mandor (L03) jam
M3
Kg
B. BAHAN
M2 / Jam
C. PERALATAN
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(11)
JENIS PEKERJAAN : Kerb Pracetak yang digunakan kembali
KM SATUAN PEMBAYARAN : M
jam
-
Kg/M3
NO. KOMPONEN SATUAN
A. TENAGA
B. BAHAN
Liter 1. Mortar M3
- 2 Material lainnya Ls
menit
menit
menit
menit
menit
C. PERALATAN
M3
1. Concrete Mixer E06 Jam
2. Alat Bantu Ls
jam
Buah
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT 15.0
orang F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
Analisa El-8410a
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(10).(a)
JENIS PEKERJAAN : Kerb Pracetak Jenis 1 (Peninggi/Mountabl
KM SATUAN PEMBAYARAN : M'
jam
-
PERKIRAAN
NO. KOMPONEN SATUAN
A. TENAGA
0.0000
0.24825 1. Pekerja Biasa (L01) jam
2. Tukang (L02) jam
3. Mandor (L03) jam
M3 Dimensi
M3 lihat gambar
B. BAHAN
menit 2 Mortar M3
menit
menit
menit
menit
menit
C. PERALATAN
M
1. Flat Bed Truck E11 Jam
2. Alat Bantu Ls
Jam
M'
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT 15.0
orang F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
0.0000
Analisa El-8410b
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(10).(b)
JENIS PEKERJAAN : Kerb Pracetak Jenis 2 (Penghalang/Barrier
KM SATUAN PEMBAYARAN : M'
jam
-
PERKIRAAN
NO. KOMPONEN SATUAN
A. TENAGA
0.0000
0.24825 1. Pekerja Biasa (L01) jam
2. Tukang (L02) jam
3. Mandor (L03) jam
M3 Dimensi
M3 lihat gambar
B. BAHAN
menit 2 Mortar M3
menit
menit
menit
menit
menit
C. PERALATAN
M
1. Flat Bed Truck E11 Jam
2. Alat Bantu Ls
Jam
M'
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT 15.0
orang F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
0.0000
Analisa El-8410c
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(10).(c)
JENIS PEKERJAAN : Kerb Pracetak Jenis 3 (Kerb Berparit/Gutte
KM SATUAN PEMBAYARAN : M'
jam
-
PERKIRAAN
NO. KOMPONEN SATUAN
A. TENAGA
0.0000
0.24825 1. Pekerja Biasa (L01) jam
2. Tukang (L02) jam
3. Mandor (L03) jam
M3 Dimensi
M3 lihat gambar
B. BAHAN
menit 2 Mortar M3
menit
menit
menit
menit
menit
C. PERALATAN
M
1. Flat Bed Truck E11 Jam
2. Alat Bantu Ls
Jam
M'
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT 15.0
orang F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
0.0000
Analisa El-8410d
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(10).(d)
JENIS PEKERJAAN : Kerb Pracetak Jenis 4 (Penghalang Berpar
KM SATUAN PEMBAYARAN : M'
jam
-
PERKIRAAN
NO. KOMPONEN SATUAN
A. TENAGA
0.0000
0.24825 1. Pekerja Biasa (L01) jam
2. Tukang (L02) jam
3. Mandor (L03) jam
M3 Dimensi
M3 lihat gambar
B. BAHAN
M'
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT 15.0
orang F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
0.0000
Analisa El-8410e
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(10).(e)
JENIS PEKERJAAN : Kerb Pracetak Jenis 5 (Penghalang Berpar
KM SATUAN PEMBAYARAN : M'
jam
-
PERKIRAAN
NO. KOMPONEN SATUAN
A. TENAGA
0.0000
0.24825 1. Pekerja Biasa (L01) jam
2. Tukang (L02) jam
3. Mandor (L03) jam
M3 Dimensi
M3 lihat gambar
B. BAHAN
menit 2 Mortar M3
menit
menit
menit
menit
menit
C. PERALATAN
M
1. Flat Bed Truck E11 Jam
2. Alat Bantu Ls
Jam
M'
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT 15.0
orang F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
0.0000
Analisa El-8410f
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(10).(f)
JENIS PEKERJAAN : Kerb Pracetak Jenis 6 (Kerb dengan bukaa
KM SATUAN PEMBAYARAN : Buah
jam
-
PERKIRAAN
NO. KOMPONEN SATUAN
A. TENAGA
0.0000
0.24825 1. Pekerja Biasa (L01) jam
2. Tukang (L02) jam
3. Mandor (L03) jam
M3 Dimensi
M3 lihat gambar
B. BAHAN
menit 2 Mortar M3
menit
menit
menit
menit
menit
C. PERALATAN
M
1. Flat Bed Truck E11 Jam
2. Alat Bantu Ls
Jam
M'
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT 15.0
orang F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
0.0000
Analisa El-8410g
SATUAN KETERANGAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ……………………………………………………………
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(10).(g)
JENIS PEKERJAAN : Kerb Pracetak Jenis 7a (Kerb pd pelandaia
KM SATUAN PEMBAYARAN : Buah
jam
-
PERKIRAAN
NO. KOMPONEN SATUAN
A. TENAGA
0.0000
0.24825 1. Pekerja Biasa (L01) jam
2. Tukang (L02) jam
3. Mandor (L03) jam
M3 Dimensi
M3 lihat gambar
B. BAHAN
menit 2 Mortar M3
menit
menit
menit
menit
menit
C. PERALATAN
M
1. Flat Bed Truck E11 Jam
2. Alat Bantu Ls
Jam
M'
orang D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
orang E. OVERHEAD & PROFIT 15.0
orang F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
jam berat untuk bahan-bahan.
jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyed
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dala
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Berlanjut ke hal. berikut.
Analisa El-8410g
SATUAN KETERANGAN
0.0000
Analisa EI-841
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
Termoplastik TOTAL HARGA (Rp.) : 114,790.83
% THD. BIAYA PROYEK : 0.01
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
Bukan Termoplastic TOTAL HARGA (Rp.) : 103,578.33
% THD. BIAYA PROYEK : 0.01
PERKIRAAN HARGA JUMLAH
KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
n Tunggal dengan PermukaanTOTAL HARGA (Rp.) : 422,126.51
% THD. BIAYA PROYEK : 0.03
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
n Ganda dengan Permukaan P
TOTAL HARGA (Rp.) : 625,355.96
% THD. BIAYA PROYEK : 0.04
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
n Ganda dengan Permukaan Pe
TOTAL HARGA (Rp.) : 717,676.51
% THD. BIAYA PROYEK : 0.04
Analisa EI-845
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 92,685.47
% THD. BIAYA PROYEK : 0.01
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 315,996.04
% THD. BIAYA PROYEK : 0.02
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 143,920.52
% THD. BIAYA PROYEK : 0.01
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 624,573.52
% THD. BIAYA PROYEK : 0.04
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 64,934.70
% THD. BIAYA PROYEK : 0.00
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 144,859.70
% THD. BIAYA PROYEK : 0.01
Analisa EI-8412
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
Blok Beton pada Trotoar dan TOTAL HARGA (Rp.) : 44,192.24
% THD. BIAYA PROYEK : 0.00
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
ak yang digunakan kembali TOTAL HARGA (Rp.) : 29,943.41
% THD. BIAYA PROYEK : 0.00
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
k Jenis 1 (Peninggi/Mountabl TOTAL HARGA (Rp.) : 69,628.58
% THD. BIAYA PROYEK : 0.00
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
k Jenis 3 (Kerb Berparit/GutteTOTAL HARGA (Rp.) : 81,284.01
% THD. BIAYA PROYEK : 0.00
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
k Jenis 4 (Penghalang BerparTOTAL HARGA (Rp.) : 95,146.05
% THD. BIAYA PROYEK : 0.01
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
k Jenis 5 (Penghalang BerparTOTAL HARGA (Rp.) : 112,634.43
% THD. BIAYA PROYEK : 0.01
…………………………………
……………………………………………………..
…………………………………
PERKIRAAN VOL. PEK. : 1.00
k Jenis 7a (Kerb pd pelandaiaTOTAL HARGA (Rp.) : 348,588.01
% THD. BIAYA PROYEK : 0.02
A. URAIAN PERALATAN
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00
2. Upah Operator / Sopir U1 4,179.29
3. Upah Pembantu Operator / Pmb.Sopir U2 3,707.86
4. Bahan Bakar Bensin Mb 5,833.80
5. Bahan Bakar Solar Ms 6,548.35
6. Minyak Pelumas Mp 18,000.00
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
SATUAN KET.
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
TRUCK 3-4 M3 E08 PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.4
Ton JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun DUMP TRUCK 3-4 M3
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
-
A. PEKERJA
Rupiah 1. -
2. -
Rupiah B. BAHAN
1. -
Rupiah 2. -
C. ALAT
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
D TRUCK 3-4 M3 (E11) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.5
M3 JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun FLAT BED TRUCK 3-4 M3
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah C. ALAT
Rupiah
Rupiah
Rupiah D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C )
E. OVERHEAD & PROFIT
Rupiah F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
Rupiah berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
% / Tahun yang dibayar dari kontrak) dan biaya-biaya lainnya.
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
NKER 3000-4500 L. (E23) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.6
Liter JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun 0 WATER TANKER 3000-4500 L.
Jam 0 SATUAN PEMBAYARAN : JAM
Rupiah 0
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah C. ALAT
Rupiah
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
ZER 100-150 HP (E04) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.7
- JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun BULLDOZER 100-150 HP
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
C. ALAT
Rupiah
1. BULLDOZER 100-150 HP
Rupiah 2. -
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
RADER >100 HP (E13) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.8
- JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun 0 MOTOR GRADER >100 HP
Jam 0 SATUAN PEMBAYARAN : JAM
Rupiah 0
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. MOTOR GRADER >100 HP
2. -
Rupiah
Rupiah
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
OADER 1.0-1.6 M3 (E15) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.9
M3 JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun WHEEL LOADER 1.0-1.6 M3
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
C. ALAT
Rupiah
1. WHEEL LOADER 1.0-1.6 M3
2. -
Rupiah
Rupiah
Rupiah
Rupiah
D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C )
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
% / Tahun berat untuk bahan-bahan.
Rp./Jam 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
Rp./Jam dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia
Liter terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
Liter 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
Liter 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berk
yang dibayar dari kontrak) dan biaya-biaya lainnya.
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
OADER 75-100 HP (E14) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.10
M3 JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun TRACK LOADER 75-100 HP
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. TRACK LOADER 75-100 HP
2. -
Rupiah
Rupiah
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
TOR 80-140 HP (E10) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.11
M3 JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun EXCAVATOR 80-140 HP
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. EXCAVATOR 80-140 HP
2. -
Rupiah
Rupiah
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
E 10-15 TON (E07) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.12
Ton JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun CRANE 10-15 TON
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. CRANE 10-15 TON
2. -
Rupiah
Rupiah
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
EEL ROLLER 6-9 T. (E16) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.13
Ton JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun STEEL WHEEL ROLLER 6-9 T.
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. STEEL WHEEL ROLLER 6-9 T.
2. -
Rupiah
Rupiah
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
RY ROLLER 5-8 T. (E19) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.14
Ton JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun VIBRATORY ROLLER 5-8 T.
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. VIBRATORY ROLLER 5-8 T.
2. -
Rupiah
Rupiah
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
RY COMPACTOR (E25) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.15
Ton JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun VIBRATORY COMPACTOR
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. VIBRATORY COMPACTOR
2. -
Rupiah
Rupiah
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
OLLER 8-10 T. (E18) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.16
Ton JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun TIRE ROLLER 8-10 T.
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. TIRE ROLLER 8-10 T.
2. -
Rupiah
Rupiah
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
SOR 4000-6500 L\M (E05) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.17
- JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun COMPRESSOR 4000-6500 L\M
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. COMPRESSOR 4000-6500 L\M
2. -
Rupiah
Rupiah
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
MIXER 0.3-0.6 M3 (E06) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.18
Liter JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun CONCRETE MIXER 0.3-0.6 M3
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. CONCRETE MIXER 0.3-0.6 M3
2. -
Rupiah
Rupiah
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
UMP 70-100 mm (E22) PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.19
- JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun WATER PUMP 70-100 mm
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. WATER PUMP 70-100 mm
2. -
Rupiah
Rupiah
Rupiah
Rupiah
SATUAN KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
K HAMMER E26 PROP / KAB / KODYA :
HP ITEM PEMBAYARAN NO. : 9.20
- JENIS PEKERJAAN : PEKERJAAN HARIAN
Tahun JACK HAMMER
Jam SATUAN PEMBAYARAN : JAM
Rupiah
NO. KOMPONEN
Rupiah
- A. PEKERJA
1. -
Rupiah 2. -
Rupiah
B. BAHAN
Rupiah
1. -
2. -
Rupiah
Rupiah
Rupiah
C. ALAT
Rupiah
1. JACK HAMMER
2. -
Rupiah
Rupiah
Rupiah
Rupiah
- - -
- - -
- - -
- - -
Analisa EI-95
- - -
- - -
- - -
- - -
Analisa EI-96
- - -
- - -
- - -
- - -
Analisa EI-97
- - -
- - -
Analisa EI-98
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Analisa EI-910
- - -
- - -
- - -
- - -
jam 1.0000 94,393.31 94,393.31
jam - - -
Analisa EI-911
- - -
- - -
- - -
- - -
Analisa EI-912
- - -
- - -
- - -
- - -
Analisa EI-913
FORMULIR STANDAR UNTUK
EREKAMAN ANALISA MASING-MASING HARGA SATUAN
- - -
- - -
- - -
- - -
Analisa EI-914
- - -
- - -
- - -
- - -
jam 1.0000 109,222.93 109,222.93
jam - - -
Analisa EI-915
- - -
- - -
- - -
- - -
Analisa EI-916
- - -
- - -
- - -
- - -
Analisa EI-917
- - -
- - -
- - -
- - -
Analisa EI-918
- - -
- - -
- - -
- - -
Analisa EI-919
- - -
- - -
- - -
- - -
jam 1.0000 15,301.98 15,301.98
jam - - -
Analisa EI-920
- - -
- - -
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (1)
JENIS PEKERJAAN : Pemeliharaan Rutin Perkerasan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-1012
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (2)
JENIS PEKERJAAN : Pemeliharaan Rutin Bahu Jalan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Motor Grader (E13) Jam 12.6000 174,720.44
2. Flat Bed Truck (E11) Jam 12.6000 242,689.55
3. Roller (E16) Jam 12.6000 75,856.28
Analisa EI-1013
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (3)
JENIS PEKERJAAN : Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
C. PERALATAN
Analisa EI-1014
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (4)
JENIS PEKERJAAN : Pemeliharaan Rutin Perlengkapan Jalan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-1015
A. TENAGA
B. BAHAN
C. PERALATAN
3.02
JUMLAH
HARGA
(Rp.)
1,760,464.80
550,465.20
2,310,930.00
4,793,560.15
11,597,262.16
7,422,639.05
10,527,000.00
34,340,461.35
4,402,954.97
6,115,776.55
2,067,289.19
12,586,020.71
49,237,412.07
7,385,611.81
56,623,023.88
7,077,877.98
3,932,154.44
Analisa EI-1012
1.36
JUMLAH
HARGA
(Rp.)
586,821.60
183,488.40
770,310.00
11,948,754.65
1,195,000.00
13,143,754.65
2,201,477.49
3,057,888.27
955,789.07
6,215,154.83
20,129,219.48
3,019,382.92
23,148,602.40
2,893,575.30
1,607,541.83
Analisa EI-1013
1.69
JUMLAH
HARGA
(Rp.)
1,173,643.20
366,976.80
1,540,620.00
8,121,081.00
8,121,081.00
8,805,909.95
6,625,955.22
15,431,865.17
25,093,566.17
3,764,034.92
28,857,601.09
3,607,200.14
2,004,000.08
Analisa EI-1014
0.58
JUMLAH
HARGA
(Rp.)
293,410.80
45,872.10
339,282.90
5,149,991.30
5,149,991.30
3,057,888.27
3,057,888.27
8,547,162.47
1,282,074.37
9,829,236.84
1,228,654.61
682,585.89
Analisa EI-1015
3.06
JUMLAH
HARGA
(Rp.)
3,520,929.60
1,100,930.40
4,621,860.00
10,257,974.84
10,257,974.84
30,578,882.73
30,578,882.73
45,458,717.57
6,818,807.64
52,277,525.21
6,534,690.65
3,630,383.69
uk PPN yang dibayarkan
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
Retak sedang
40%
40%
20%
Thd.Biaya Bahan
KETERANGAN
Thd.Biaya Bahan
& Timbunan
KETERANGAN
Thd.Total Pjg.Jln
Thd.Total Pjg.Jln
KETERANGAN
KETERANGAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Tebal lapis agregat padat t 0.15 M
6 Jam kerja efektif per-hari Tk 7.00 jam
7 Berat isi padat Bip 1.81 ton/m3
8 Berat volume agregat (lepas) Bil 1.51 ton/m3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1
- Mencampur T1 1.00 menit
- Memuat dan lain-lain T2 0.45 menit
Ts1 1.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 76.81 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 537.66 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1953 jam
- Mandor = (Tk x M) : Qt (L03) 0.0130 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Tebal Lapis Hotmix padat t 0.04 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi padat Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 44.70 %
- Agregat Pecah Mesin 0 - 5 mm 0-5 48.00 %
- Semen FF 1.90 %
- Asphalt As 5.40 %
11 Berat Isi bahan :
- AC-WC D1 2.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
11 Jarak Stock pile ke Cold Bin l 50.00 m
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10 & 10-15" x (D1 x tM3) x Fh1) : D2 (M92) 0.0307 M3
1.b. Agr 0-5 = ("0-5" x (D1 x tM3) x Fh1) : D3 (M91) 0.0298 M3
1.c. Semen = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 1.8514 Kg
1.d. Aspal = (AS x (D1 x tM3) x Fh2) x 1000 (M10) 5.1615 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Kecepatan maju Vf 15.00 km/jam
Kecepatan kembali Vr 20.00 km/jam
Waktu siklus
((l x 60 : (Vf x 1000)) + (l x 60 : (Vr x 1000))) + 0.75 Ts1 1.10 menit
3. TENAGA
Produksi menentukan : DUMP TRUCK Q4 0.94 M3 / Jam
Produksi ATB / hari = Tk x Q4 Qt 6.57 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 10.6506 Jam
- Mandor = (Tk x M) / Qt (L03) 2.1301 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal rata2 Lapen t 0.055 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00 Kg/M2
- Agregat Pengunci Ap 25.00 Kg/M2
- Aspal : - Paska Agregat Pokok As1 5.20 Kg/M2
As2 94.55 Kg/M3
9 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
- Aspal D2 1.01 ton / M3
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778 M3
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778 M3
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45 menit
Ts1 0.45 menit
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 117.58 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 823.08 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1701 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0170 Jam
I. ASUMSI
1 Menggunakan buruh dan alat (semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum Sa 19.00 MM
- Kadar Aspal terhadap berat total campuran As 4.50 %
- Tebal nominal padat t 0.04 M
6 Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil) D1 2.01 Ton/M3
- Aspal (diambil) D2 1.00 Ton/M3
- Agregat (diambil) D3 1.60 Ton/M3
7 Faktor kembang campuran Fk 1.20
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1997 M3
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 90.4500 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts1
- Memuat T1 5.00 menit
- Mengaduk T2 3.50 menit
- Menuang T3 3.00 menit
- Tunggu, dll. T4 2.00 menit
Ts1 13.50 menit
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 1.844 M3/Jam
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 12.91 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.5422 jam
- Pekerja = (Tk x P) : Qt (L01) 6.5060 jam
Rp. 1,243,181.53 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00 %
- Minyak Fluk / Pencair K 13.00 %
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.03 Kg / Ltr
- Minyak Fluk / Pencair D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 850.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu Siklus (termasuk proses pemanasan) Ts 2.00 Jam
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 352.75 liter
Produksi / hari = Tk x Q1 Qt 2,469.25 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
ALAT BANTU
Diperlukan :
- Gunting Rumput = 1 buah
- Sapu = 1 buah
- Keranjang = 1 buah
3. TENAGA
Koefisien Tenaga / M2 :
- Mandor = (Tk x M x Y) : Qt (L03) 0.0700 jam
- Pekerja = (Tk x P x Y) : Qt (L01) 0.2800 jam
Rp. 272.06 / M2
I. ASUMSI
1 Memotong rumput/tanaman dengan ket8inggian pemo-
tongan max 10 cm dari permukaan tanah
Rumput/tanamam dipotong dibuang keluar lokasi yang
2 dibersihkan dan tidak boleh dibakar
3 Dilaksanakan sebanyak 3 kali selama periode pelak-
sanaan
4 Jam kerja efektif per hari Tk 7 jam
PERALATAN
2.c. ALAT BANTU
Diperlukan :
- Parang = 2 buah
3. TENAGA
Volume pemotongan rumput dalam 1 hari Qt 600.00 M2
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.0003 jam
Rp. 76.51 / M3
ITEM PEMBAYARAN NO. : 10.1 (4) b.
JENIS PEKERJAAN : Perawatan Patok Hektometer
SATUAN PEMBAYARAN : Bh. URAIAN ANALISA HARGA S
I. ASUMSI
1 Volume patok per-buah Vg 0.028 M3
2 Volume galian tanah per-buah patok Vt 0.050 M3
Volume perbaikan patok per-buah Vp 0.006 M3
3 Bahan dasar (batu, pasir dan semen) diterima di lokasi
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 15.0 KM
5 Jam kerja efektif per-hari Tk 7.0 jam
6 Kadar Semen (Spesifikasi) : - Minimum Ks1 340 Kg/M3
: - Maksimum Ks2 400 Kg/M3
7 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
8 Perbandingan Camp. 1 : Semen Sm 15.4 %
2 : Pasir Ps 30.8 %
3.5 : Agregat Kasar Kr 53.8 %
9 Berat Jenis Material :
- Beton D1 2.40 T/M3
- Semen D2 1.44 T/M3
- Pasir D3 1.67 T/M3
- Agregat Kasar D4 1.80 T/M3
1. BAHAN
1.a. Semen (PC) = {Sm x D1 x 1000} x Vp (M12) 6.9231 Zak
1.b. Pasir Beton = {(Ps x D1) : D3} x Vp (M01) 0.4146 M3
1.c. Agregat Kasar = {(Kr x D1) : D4} x Vp (M03) 0.6731 M3
1.d. Cat (M42) 0.2500 Kg
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Sekop = 1 buah
- Pacul = 1 buah
- Sendok Semen = 1 buah
- Ember Cor = 1 buah
3. TENAGA
Volume perawatan patok dalam 1 hari Qt 60.00 buah
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.0058 jam
Rp. 262,953.71 / M3
I. ASUMSI
1 Volume patok per-buah Vg 0.03 M3
2 Volume galian tanah per-buah patok Vt 0.05 M3
Volume perbaikan patok per-buah Vp 0.01 M3
3 Bahan dasar (batu, pasir dan semen) diterima di lokasi
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 15.0 KM
5 Jam kerja efektif per-hari Tk 7.0 jam
6 Kadar Semen (Spesifikasi) : - Minimum Ks1 340 Kg/M3
: - Maksimum Ks2 400 Kg/M3
7 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
8 Perbandingan Camp. 0.75 : Semen Sm 13.0 %
2 : Pasir Ps 34.8 %
3 : Agregat Kasar Kr 52.2 %
9 Berat Jenis Material :
- Beton D1 2.40 T/M3
- Semen D2 1.44 T/M3
- Pasir D3 1.67 T/M3
- Agregat Kasar D4 1.80 T/M3
1. BAHAN
1.a. Semen (PC) = {Sm x D1 x 1000} x Vp (M12) 0.0000 Zak
1.b. Pasir Beton = {(Ps x D1) : D3} x Vp (M01) 0.0000 M3
1.c. Agregat Kasar = {(Kr x D1) : D4} x Vp (M03) 0.0000 M3
1.d. Cat (M42) 0.2500 Kg
1.e. Pemantul Cahaya (M43) 1.0000 Bh
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Sekop = 1 buah
- Pacul = 1 buah
- Sendok Semen = 1 buah
- Ember Cor = 1 buah
3. TENAGA
Volume perawatan patok dalam 1 hari Qt 90.00 buah
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.0039 jam
Rp. 30,793.85 / M3
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Pekerjaan meliputi Pembetulan posisi rambu,
pengencangan baut dan pengecatan.
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 15.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Cat (M42) 0.2500 Kg.
2. ALAT
2.a. ALAT BANTU
- Tang, Obeng, dll = 2 set
- Kwas, dll = 2 buah
3. TENAGA
Produksi perawatan rambu dalam 1 hari Qt 50.00 Buah
Kebutuhan tenaga : - Mandor M 0.10 orang
- Pekerja P 2.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.0140 jam
- Pekerja = (Tk x P) : Qt (L01) 0.2800 jam
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Volume perawatan per-M2 marka jalan Vp 15.00 %
3 Bahan dasar diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 15.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -
7 Tebal lapisan cat secara manual t 0.00 M
8 Berat Jenis Bahan Cat BJ.Cat 0.85 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 60 %
- Thinner T 40 %
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran.
2 Pengecatan dilakukan dengan menggunakan alat bantu.
3 Jumlah cat cair = (1 M x 1 M) x t x 1000 R 2.50 Ltr/M2
1. BAHAN
1.a. Cat Marka Jalan = C x R x (BJ.Cat) x Vp x Fh (M17) 0.2008 Kg
2. ALAT
3. TENAGA
Produksi pekerjaan per hari Qt 100.00 M2
dibutuhkan tenaga : - Mandor M 0.15 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0105 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.2100 jam
ITEM PEMBAYARAN NO. : 10.1 (4) e.
JENIS PEKERJAAN : Perawatan Marka Jalan
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SA
Rp. 6,986.02 / M2
I. ASUMSI
1 Panjang selokan per-1 M3 pasangan batu Ls 2.27 M'
2 Pembersihan/galian tanah per-M' selokan Gt 0.20 M3
3 - Volume perawatan pas. batu per-100 M' selokan Pb 0.40 M3
- Volume perawatan plesteran per-100 M' selokan Pl 4.00 M2
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.725 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Pasir & Semen : - Volume Semen Sm 25 %
: - Volume Pasir Ps 75 %
7 Perbandingan Batu & Mortar :
- Batu Bt 60 %
- Mortar (campuran semen & pasir) Mr 40 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu D2 1.60 ton/M3
- Adukan (mortar) D3 1.80 ton/M3
- Pasir D4 1.67 ton/M3
- Semen Portland D5 1.44 ton/M3
9 Faktor kehilangan bahan : - Batu Fh1 1.20 -
- Pasir / Semen Fh2 1.05 -
- Pacul = 2 buah
- Sendok Semen = 2 buah
- Ember Cor = 1 buah
- Gerobak Dorong = 1 buah
3. TENAGA
Panjang perawatan selokan dalam 1 hari Qt 8.53 M'
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.2461 jam
Rp. 61,126.92 / M3
I. ASUMSI
1 Panjang selokan per-1 M' = 0.28 M3 M' 1.00 M'
2 Pembersihan/galian tanah per-M3 selokan Gt 3.57 M'
3 Jam kerja efektif per-hari Tk 7.00 jam
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas bak V 10.00 ton
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 25.00 KM / Jam
Kecepatan rata-rata kosong v2 30.00 KM / Jam
Waktu Siklus Ts2
- Waktu tempuh isi = (L2 : v1) x 60 menit T1 3.60 menit
- Waktu tempuh kosong = (L2 : v2) x 60 menit T2 3.00 menit
- Lain-lain T3 8.00 menit
Ts2 14.60 menit
- Cangkul = 1 buah
- Sekop = 1 buah
- Gerobak Dorong = 1 buah
3. TENAGA
Produksi menentukan : DUMP TRUCK Q2 121.77 M'/Jam
Produksi Agregat / hari = Tk x Q1 Qt 852.40 M'
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.0000 jam
Rp. 1,241.57 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor pengembangan bahan Fk 1.20 -
KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
MATA PEMBAYARAN NO. : 10.A
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk -
SATUAN PEMBAYARAN : M3 Pek. Rutin
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
Lump Sum
Berlanjut ke halaman berikut
Analisa EI-10A
KETERANGAN
Analisa EI-10B
KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 10.B
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
Gradasi harus -
memenuhi - A. TENAGA
Spesifikasi
1. Pekerja Biasa (L01) Jam 10.6506
2. Mandor (L03) Jam 2.1301
B. BAHAN
1. Agr 5-10 & 10-15 (M92) M3 0.0307
2. Agr 0-5 (M91) M3 0.0298
3 Semen (M05) M3 1.8514
4 Aspal (M10) Kg 5.1615
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0218
2. AMP (E01) Jam 0.0466
3. Genset (E12) Jam 0.0466
4. Dump Truck (E08) Jam 1.0651
5. Asp. Finisher (E02) Jam 0.0000
6. Pedestrian Roller (E24) Jam 0.1975
7 P. Tyre Roller (E18) Jam 0.0000
8 Alat Bantu Ls 1.0000
KETERANGAN
Berlanjut ke halaman berikut
Analisa EI-10B
KETERANGAN
Lump Sum
Analisa EI-10C
KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 10.C
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3 0
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
Tabel 6.6.4.
Tabel 6.6.4.
Tabel 6.6.4.
(As1 : t) A. TENAGA
B. BAHAN
C. PERALATAN
Lihat panduan
KETERANGAN
Berlanjut ke halaman berikut
Analisa EI-10C
KETERANGAN
Lump Sum
Analisa EI-10D
KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 10.D
JENIS PEKERJAAN : Camp. Aspal Dingin Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3
Spec. 6.5.2 (2)
Tabel 6.5.3 (1)
Tabel 6.5.3 (1) PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
Melayani 1 buah
molen
KETERANGAN
Analisa EI-10E
KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 10.E
JENIS PEKERJAAN : Aspal Pengisian Retak
SATUAN PEMBAYARAN : LITER
100 bagian
15 bagian PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
NGAN RUMPUT
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
PROPINSI :
MATA PEMBAYARAN :
URAIAN : PEMELIHARAAN RUTIN UNTUK PEMOTONGAN RUMPUT
SATUAN PEMBAYARAN : M2
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
PROYEK :
PAKET :
NAMA KONTRAK :
PROVINSI :
ITEM PEMBAYARAN NO. : 10.1 (1) b
JENIS PEKERJAAN : Pembersihan Rumija
SATUAN PEMBAYARAN : M2
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa 1014b
PROYEK :
PAKET :
NAMA KONTRAK :
± 20 % PROVINSI :
ITEM PEMBAYARAN NO. : 10.1 (4) b.
JENIS PEKERJAAN : Perawatan Patok Hektometer
SATUAN PEMBAYARAN : Bh.
Tabel 7.1.3.(1)
Tabel 7.1.3.(1)
Tabel 7.1.3.(1) PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
_x001E_4_ Analisa 1014c
PROYEK :
PAKET :
NAMA KONTRAK :
± 20 % PROVINSI : 10.1 (4) b.
ITEM PEMBAYARAN NO. : 10.1 (4) c.
JENIS PEKERJAAN : Perawatan Patok Pengarah
SATUAN PEMBAYARAN : Bh.
Tabel 7.1.3.(1)
Tabel 7.1.3.(1)
Tabel 7.1.3.(1) PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
_x001E_4_ Analisa 1014d
PROYEK :
PAKET :
NAMA KONTRAK
PROVINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN : Perawatan Rambu lalu lintas
SATUAN PEMBAYARAN : BH
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK
PAKET
NAMA KONTRAK
PROVINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN : Perawatan Marka Jalan
SATUAN PEMBAYARAN : M2
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
KETERANGAN
IAN ANALISA HARGA SATUAN
PROYEK :
PAKET :
A sal. ~ 0.44 M3 NAMA KONTRAK :
PROVINSI :
ITEM PEMBAYARAN NO. : 10.1 (3) a.
JENIS PEKERJAAN : Pemeliharan Selokan Samping Diperker
SATUAN PEMBAYARAN : M
Spec. 7.3.2.(2) b
Spec. 7.3.2.(2) b PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
KETERANGAN
Lump sump
IAN ANALISA HARGA SATUAN
PROGRAM :
PAKET :
KEGIATAN :
PROVINSI :
ITEM PEMBAYARAN NO. : 10.1 (3)a
JENIS PEKERJAAN : Pembersihan Selokan Samping Diperker
SATUAN PEMBAYARAN : M'
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
Bersambung
KETERANGAN
Analisa EI-21
PROGRAM :
No. PAKET KONTRAK :
KEGIATAN :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 10.1 (3)a
JENIS PEKERJAAN : Pemeliharaan Rutin Saluaran Tidak Diperkera
SATUAN PEMBAYARAN : M'
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
Analisa EI-10A Analisa EI- Analisa EI- Analisa EI-
: Pondasi : Pondasi : Pondasi
NDAR UNTUK FORMULIRFORMULIRFORMULIR
NG-MASING HARGA SATUAN PEREKAMA PEREKAMA PEREKAMA
262,099.45 3,412.40
131,467.37 102,565.09 102,565.09102,565.09102,565.09102,565.09102,565.09
18,762.23 988.20 988.20 988.20 988.20 988.20
131,467.37 1,847.93 1,847.93 1,847.93 1,847.93 1,847.93
100.00 100.00 100.00 100.00 100.00 100.00
padat padat padat padat
padat padat padat padat
UMLAH HARGA PERALATAN 108,913.63 108,913.63108,913.63108,913.63108,913.63
108,913.63108,913.63108,913.63108,913.63
LATAN ( A + B + C ) 267,309.95 267,309.95267,309.95267,309.95267,309.95
40,096.49 40,096.49 40,096.49 40,096.49 40,096.49
307,406.44 307,406.44307,406.44307,406.44307,406.44
KM/jam KM/jam KM/jam KM/jam
KM/jam KM/jam KM/jam KM/jam
menit menit menit menit
menit menit menit menit
menit menit menit menit
menit menit menit menit
menit menit menit menit
menit menit menit menit
Berlanjut k Berlanjut k Berlanjut k Berlanjut k
Analisa EI-10B
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 49,603.17
7,281.29 15,510.01
262,099.45 5,714.92
3,959,664.02 184,466.28
230,331.53 10,730.30
131,467.37 140,020.57
118,098.26 0.00
18,762.23 3,705.75
132,085.27 0.00
150.00 150.00
LATAN ( A + B + C ) 446,827.01
67,024.05
513,851.06
Analisa EI-10C
NDAR UNTUK
NG-MASING HARGA SATUAN
PERKIRAAN VOL. PEK. : 7.38
TOTAL HARGA : 8,515,615.94
% THD. BIAYA PROYEK : 0.57
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 792.17
7,281.29 123.85
162,952.13 240,807.03
162,952.13 45,264.48
6,400.00 635,345.45
262,099.45 2,229.05
131,467.37 75,679.32
75,856.28 2,932.40
18,396.47 660.16
150.00 150.00
LATAN ( A + B + C ) 1,003,983.92
150,597.59
1,154,581.51
Analisa EI-10D
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 30,300.60
7,281.29 3,947.69
162,952.13 195,496.72
5,000.00 452,250.00
38,332.25 20,782.54
18,762.23 4,173.25
242,689.55 373,426.62
650.00 650.00
LATAN ( A + B + C ) 1,081,027.42
162,154.11
1,243,181.53
Analisa EI-10E
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 132.03
7,281.29 20.64
6,400.00 6,308.54
1,650.00 235.95
18,396.47 52.15
82,035.29 256.36
131,467.37 372.69
LATAN ( A + B + C ) 7,378.37
1,106.76
8,485.12
NDAR UNTUK
NG-MASING HARGA SATUAN
NTUK PEMOTONGAN RUMPUT
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 1,304.05
7,281.29 509.69
1,813.74
ALATAN ( A + B + C ) 1,813.74
272.06
2,085.80
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 54.34
7,281.29 2.20
56.53
0.00
10.00 10.00
10.00
LATAN ( A + B + C ) 66.53
9.98
76.51
Analisa 1014b
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 2,173.41
7,281.29 42.47
2,215.89
27,546.25 190,704.81
70,400.00 29,184.71
0.00 0.00
25,000.00 6,250.00
300.00 300.00
226,439.52
0.00 0.00
0.00
LATAN ( A + B + C ) 228,655.40
34,298.31
262,953.71
ntuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 1,448.94
7,281.29 28.32
1,477.26
25,000.00 0.00
300.00 300.00
25,000.00 25,000.00
25,300.00
0.00 0.00
0.00
LATAN ( A + B + C ) 26,777.26
4,016.59
30,793.85
ntuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 1,304.05
7,281.29 101.94
1,405.99
25,000.00 6,250.00
0.00 0.00
6,250.00
0.00 0.00
0.00
LATAN ( A + B + C ) 7,655.99
1,148.40
8,804.38
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 978.04
7,281.29 76.45
1,054.49
25,000.00 5,020.31
0.00 0.00
5,020.31
0.00 0.00
0.00
LATAN ( A + B + C ) 6,074.80
911.22
6,986.02
PERKIRAAN VOL. PEK. :
TOTAL HARGA (Rp.) :
% THD. BIAYA KEGIATAN :
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 22,919.04
7,281.29 1,791.59
24,710.63
242,689.55 28,443.21
0.00 0.00
28,443.21
LATAN ( A + B + C ) 53,153.84
7,973.08
61,126.92
ntuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
4,657.31 0.00
7,281.29 0.00
0.00
131,467.37 1,079.63
0.00 0.00
1,079.63
LATAN ( A + B + C ) 1,079.63
161.94
1,241.57
Analisa EI-21
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
13,741,067.13,741,067.13,741,067.13,741,067.84
13,741,067.13,741,067.13,741,067.13,741,067.84
13,741,067.13,741,067.13,741,067.13,741,067.84
13,741,067.84
13,741,067.84
13,741,067.84
13,741,067.84
13,741,067.84
13,741,067.84
13,741,067.84
13,741,067.84
13,741,067.84
13,741,067.84
13,741,067.84
13,741,067.84
13,741,067.84
13,741,067.84
13,741,067.84
13,741,067.84
13,741,067.84