CONVENTIONAL WELL
WELL WITHOUT
WITHOUT MUD
MUD LINE
LINE
HANGER
HANGER
JOB SHEET FOR 9 5/8" INTERMEDIATE CASING
Aviara Energy Corp.
W.C. 507 A4 ST 2
Current Mud Weight = 10.3
Depth Previous Casing = 4,340 Casing Collar Above Wellhead = 26.84'
Type Mud System = Low Lime Casing Height Above RKB = 36.91'
MD Drilled For This Job = 13,264 RKB Length of Landing Joint (s)= 90.32'
JOINTS LEFT OUT OF STRING
#1,2,111 RKB to WHF = 80.25'
CASING CHECK
CASING CHECK
Total pipe left out of string, ft 135.77
Total pipe tallied, ft 13,433.38 CALCULATED ANN VEL FOR JOB
Total pipe run, ft 13,297.61 Rate, bpm 10 15
Casing Check Status Good News AV, fpm 179 269
Casing Check: (pipe run + pipe left out) = to the amount tallied. Pump, spm 85 128
Enter bpm to calculate an AV and PUMP spm
to circulate and cement this casing string.
ESTIMATED PSI WHEN PLUG DOWN
SUGGESTED RATES ...
Column Length of Mud 7,368 CIRCULATION RATE: SAME AS MAX AV
WHEN DRILLING THIS SECTION OF HOLE.
Total Hydrostatic PSI Annulus 8,410 DISPLACEMENT RATE: @ 1-1/2 TIMES THE
Total Hydrostatic PSI Casing 7,105 CIRCULATION RATE.
BUMP PLUG: @ 1/2 CIRCULATION RATE.
* Final Surface PSI 1,305
* DISPLACEMENT
Pump output, bbl/stk 0.117
To Land Casing Plug, bbls 935
To Land Casing Plug, stks 7,988 FS Depth Float Shoe = ###
*Assumes plug kicked- out with mud and Depth Casing Set = ###
no water ahead. Displace with rig
pumps.