This document provides cost estimates for pile footing construction at a mini sports complex in Jabi. It includes tables with quantities, volumes, areas, weights and costs for concrete, formwork, excavation and reinforcement for pile footings marked P1 through P7. The totals are provided for concrete volume (9.574 m3), formwork area (58.1 m2), lean concrete volume (1.301 m3), earth excavation volume (49.88 m3), bottom bar weight (1,268.05 kg) and side bar weight (322.509 kg). The document was generated by Ais Consultants for the project designed by Wanie on April 3, 2018.
This document provides cost estimates for pile footing construction at a mini sports complex in Jabi. It includes tables with quantities, volumes, areas, weights and costs for concrete, formwork, excavation and reinforcement for pile footings marked P1 through P7. The totals are provided for concrete volume (9.574 m3), formwork area (58.1 m2), lean concrete volume (1.301 m3), earth excavation volume (49.88 m3), bottom bar weight (1,268.05 kg) and side bar weight (322.509 kg). The document was generated by Ais Consultants for the project designed by Wanie on April 3, 2018.
This document provides cost estimates for pile footing construction at a mini sports complex in Jabi. It includes tables with quantities, volumes, areas, weights and costs for concrete, formwork, excavation and reinforcement for pile footings marked P1 through P7. The totals are provided for concrete volume (9.574 m3), formwork area (58.1 m2), lean concrete volume (1.301 m3), earth excavation volume (49.88 m3), bottom bar weight (1,268.05 kg) and side bar weight (322.509 kg). The document was generated by Ais Consultants for the project designed by Wanie on April 3, 2018.
Job Description : Kompleks Sukan Mini Jabi Designed by : Wanie Date & Time : Tuesday, 3 April, 2018 9:52:48 AM (License Number: EI007-Timer-MY-000075-0-0) _____________________________________________________________________
RC Slab Punching Shear Stresses Check & Calculation of Required Shear Reinforcement According To Aci 318M-11 Using Usr From Ramconcept To Csi Safe Programs