Anda di halaman 1dari 6

Foundation Design of Hoarding

INPUTS:
Basic Wind Speed 33.726 m/s (vb=44,k1=0.73, k2=1.05 for terrain Cat 1)
cf 1.2 Drag Coeff. as per Table 24 IS 875:III
Wind Pressure 0.853082307 kPa
Solidity ratio for truss 0.5
Weight/L of Member Type 1 4 kg/m
Total L of Type 1 100 m
Weight/L of Member Type 2 2 kg/m
Total L of Type 2 50 m

Size of RCC Col 0.8 square


Height 1m
Thk. of Footing 0.35 m 3.087
Width of Footing 2.1 m
Length(perp to banner) of Footing 4.2 m
Length of Banner 9m
Height of Banner 4.4 m
Height from base 4.5 m
RESULTS:
FOS against sliding 2.189861228 OK
FOS against OT 1.522086567 OK
Maximum Pressure below footing(kPa) 21.36902783 NOT OK
Moment at face of column/m 61.75649044 kN.m / m phi10@100 Cap 90
CALCULATIONS
Force on Banner 33.78205936 kN
Location from ground 7.7 m
Force on truss 1.151661114 kN
Location from ground 3.25 m
OVERTURNING FORCE 34.93372047 kN Rough Design Calculations for Memb
OVERTURNING MOMENT 263.8647557 kN.m ULS Force
Weight of Truss 4.9 kN Capacity of prov
Lever arm of truss 2.1 kN Bolts Area Reqd.
Weight of Column 16 kN dia
Lever Arm for col 2.1 kN N
Weight of Foundation 77.175 kN Give
Lever Arm for found. 2.1 kN
Coefficient of friction 0.4
STABILIZING FORCE 76.5 kN 324.135
STABILIZING MOMENT 401.625 kN.m
h Design Calculations for Member and Bolts
164.9154723 kN in each tension member
101.25 Required area 732.9576546 mm2
1832.394137 mm2 on each side
30 Ast 706.8583471
2.592307418 Grade 4.6
3 bolts per side of base plate of size 1000X1000

450
Length of USed Cold formed Member 50
distance of truss
Foundation Design of Hoarding(Double Hoarding)
INPUTS:
Basic Wind Speed 33.726 m/s (vb=44,k1=0.73, k2=1.05 for terrain Cat 1)
cf 1.2 Drag Coeff. as per Table 24 IS 875:III
Wind Pressure 0.853082307 kPa This type of hoarding is two hoardings
Solidity ratio for truss 0.5 and
Weight/L of Member Type 1 0 kg/m
Total L of Type 1 100 m
Weight/L of Member Type 2 0 kg/m
Total L of Type 2 50 m
No of footings 3
Size of RCC Col 0.8 square
Height 1m
Thk. of Footing 1/2 0.35 m
distance between footings 4.07 m
Width of Footing 1/2 1.65 m
Length of Footing 1/2 3.3 m
Thick of footing 3 0.35 m
Width of Footing 3 2.3 m
Length(perp to banner) of Footing 3 4.6 m V1 1.90575
Length of Banner 15 m V2 3.703
Height of Banner 4.4 m
Height from base 4.5 m
RESULTS: M=P*bd^2/3
FOS against sliding 1.419282351 OK OT1 OT2
FOS against OT 1.733370304 OK 1.733370304 1.792280304
Maximum Pressure below footing(kPa) 17.96989098 OK Assuming 2/3 of moment would be taken by the larger fo
CALCULATIONS
Force on Banner 56.30343226 kN
Location from ground 7.7 m
Force on truss 1.151661114 kN
Location from ground 3.25 m
OVERTURNING FORCE 57.45509338 kN
OVERTURNING MOMENT 437.279327 kN.m OT Check 2
Weight of Truss 0 kN 0
Lever arm of truss 2.3 m 0
Weight of Column 16 kN
Lever Arm for col 2.3 m
Weight of both Foundations 1/2 95.2875 kN 95.2875
Lever Arm for found1/2 1.65 m 5.72
Weight of Foundation 3 92.575 kN 92.575
Level Arm for Found 3 6.37 m 2.3
Coefficient of friction 0.4
Stabilizing force 81.545 kN
Stabilizing Moment 783.727125 kN.m 757.967
Expected Moment at face of column 60
Ast 785.3981634
ype of hoarding is two hoardings put up side by side

nt would be taken by the larger footing.