DOCUMENTATION OF THE
ACTIVITIES IN ELECTRICAL INSTALLATION
AND MAINTENANCE
FIRST SEMESTER S.Y. 2019-2020
SUBMITTED TO:
PROF. ADONIS D. BALURAN
SUBMITTED TO:
RONQUILLO, RAZSHARD YVES C.
ACTIVITY 1: OHMETER READING RESISTOR COLOR CODING
OBJECTIVES:
PROCEDURE:
MATERIALS:
1. Resistor (20 assorted color-coded resistors. Provided in a tray
2. Meter (Agilent 34401A Digital Multimeter which can be used to measure
Voltage(unit of volts, abbreviation is V).
Current(unit of amps, milliamps, microamps abbreviation are A,mA)
Resistance( unit of ohms, kilo-ohms, megaohms, abbreviation are Ω,kΩ,
MΩ)
ACTIVITY 2: SPLICES AND JOINTS
OBJECTIVES:
PROCEDURE
1. Using the proper size of the connector for the particular cable
2. Proper tools
3. Clean cuts and stripping
4. Restoring the insulation, armor and outersheath
5. Proper technique
MATERIAL
OBJECTIVES:
To be able to avoid what kind of obstacles or which direction you intend to take the
pipe
PROCEDURE:
MATERIALS:
1. PVC pipe
2. Cutter
3. Meter scale
4. Heat gun
ACTIVITY 4: TWO LAMPS CONTROLLED BY ONE SPST SWITCH
OBJECTIVES:
PROCEDURE:
1. Draw the circuit diagram and get them approved by staffed in charged.
2. Prepare the list of tools and material required for the work and collect them.
3. Cut the connecting wires into suitable length and make the connection according
to the circuit diagram.
4. In parallel circuit voltage remains the same across the two bulbs (resistances) but
current varies. Overall resistance in parallel circuit in smaller than the individual
resistance in the circuit
5. Positive terminal of the battery is connected with the switch and one wire is
connected with the second point of switch and with the bulb. Two bulbs are
connected in parallel as show in figure. The negative terminal is then connected
with the other point of the 2nd bulb to make a complete circuit.
6. The circuit is then check by providing the AC Supply to the circuit and shown to
the supervisor
MATERIALS: DIAGRAM
1. Bulbs
2. Switch
3. Wire
4. PVC conduit pipe
5. Receptacle
6. Junction box
7. Utility box
ACTIVITY 5:
TWO LAMPS CONTROLLED BY TWO SPST SWITCHES IN ONE LOCATION
OBJECTIVES:
PROCEDURE:
Prepare the materials needed, measure the wire and have exact size of the PVC
and I start to work. First, I place the PVC , Junction Box, Utility box to the wiring board
then I start working to connect the wires and I check it with Ohmmeter to be sure of my
work then when I am sure about my connection I light it up.
MATERIALS:
1. Utility box
2. Junction box
3. Wire
4. PVC Pipe
5. Switch
6. Receptacle
7. Bulbs
DIAGRAM: