LAPORAN KEUANGAN PEMBANGUNAN RUMAH GADANG ALUMNI (RGA)

STM / SMKN 1 BUKITTINGGI


BULAN KE 1, PERIODE TGL 1 APRIL 2019 S/D 6 MEI 2019

JUMLAH
JUMLAH UANG
NO URAIAN TANGGAL UANG MASUK SALDO (RP) KET.
KELUAR (RP)
(RP)

1 Posisi kas sesuai laporan terakhir 17 Maret 2019 290,895,000 279,156,200 11,738,800

2 Dari Sadiq C Abdillah via DPP Alumni STM/SMKN 1 BKT 01 April 2019 50,000,000 61,738,800

3 Bayar pek. Atap ke toko ANGGUN 02 April 2019 50,000,000 11,738,800

4 Dari Zetrialdi '82 via DPP Alumni STM/SMKN 1 BKT 11 April 2019 50,000,000 61,738,800

5 Bayar pek. Atap ke toko ANGGUN 11 April 2019 25,000,000 36,738,800

6 Pembayaran penebangan kayu ke sdr Anto 15 April 2019 200,000 36,538,800

7 Pembayaran uang muka kunsen ke St Bagindo Perabot 16 April 2019 6,000,000 30,538,800

8 Pembayaran batu bata ke Saudara, 2000 bh 19 April 2019 2,200,000 28,338,800

9 Pembayaran pasir 9m3 ke sdr Mul 19 April 2019 1,350,000 26,988,800

10 Pembayaran semen 25 sak ke Toko SABAR 20 April 2010 1,550,000 25,438,800

11 Beli ember 1 lusin, Toko Restu Ibu 22 April 2019 100,000 25,338,800

12 Pembayaran kunsen, St Bagindo perabot 22 April 2019 7,000,000 18,338,800

13 Pembayaran kerikil 7 m3, Jaya Material 22 April 2019 1,225,000 17,113,800

14 Beli benang tk 1 pak&paku beton 1,5 inch, toko Muda Jaya 22 April 2019 70,000 17,043,800

15 Beli anti rayap 2 btl, toko Cahaya Tani 25 April 2019 70,000 16,973,800

16 Beli paku 5 inch untuk angker kunsen, toko Asaba 25 April 2019 50,000 16,923,800
17 Beli semprotan anti rayap, toko Yen Mart 25 April 2019 15,000 16,908,800

18 Beli kopi, gula&air untuk tukang 25 April 2019 50,000 16,858,800

19 Bayar gaji tukang ke 1 27 April 2010 1,650,000 15,208,800


Dana masuk dari Edmon Ilyas via DPP Alumni STMN/SMKN 1
20 02 Mei 2019 50,000,000 65,208,800
BKT
21 Beli kopi, gula&air untuk tukang 02 Mei 2019 50,000 65,158,800

22 ATK (kertas HVS, tinta printer, poto copy) 02 Mei 2019 100,000 65,058,800

23 Bayar DP ukiran singok ke SANGGAR UKIRAN SAPALIN ke 1 03 Mei 2019 5,000,000 60,058,800

24 Bayar scaffolding 4 set, Toko Jaya Material 03 Mei 2019 72,000 59,986,800

25 Beli paku campur 10 kg, Toko Jaya Material 03 Mei 2019 200,000 59,786,800

26 Beli reng taso skor kunsen , toko Anggun 04 Mei 2019 200,000 59,586,800

27 Bayar gaji tukang ke 1 04 Mei 2019 1,950,000 57,636,800

TOTAL 440,895,000 383,258,200 57,636,800

NB :
PEKERJAAN LANUTAN TAHAP I
PEMASANGAN ATAP TOTAL BIAYA Rp. 158,150,000
PEMBAYARAN S.D MINGGU KE 2 Rp. 115,000,000
SISA Rp. 43,150,000

PEKERJAAN LANUTAN TAHAP II


PEK. DINDING BATA, PLESTER,ACI, KUNSEN PINTU Rp. 99,568,950
DAN JENDELA
PEMBAYARAN PENGADAAN KUNSEN KE 1 Rp. 6,000,000
PEMBAYARAN PENGADAAN KUNSEN KE 2 Rp. 7,000,000
UPAK PEK.DINDING BATA & PAS.KUNSEN KE 1 Rp. 1,650,000
PEMBELIAN MATERIAL Rp. 2,780,000
UPAK PEK.DINDING BATA & PAS.KUNSEN KE 2 Rp. 1,950,000

PEMBELIAN MATERIAL Rp. 622,000 20,002,000


SISA Rp. 79,566,950 83,383,950

PEKERJAAN UKIRAN SINGOK Rp. 21,805,000


PEMBAYARAN UKIRAN KE 1 Rp. 5,000,000
SISA Rp. 16,805,000

Bukittinggi, 6 Mei 2019


DISETUJUI OLEH DIBUAT OLEH

Ir MARDISON AHMAD HIDAYAT Hj.EVA RISNA


KETUA PEMBANGUNAN RGA SEKRETARIS/ PELAKSANA RGA ` BENDAHARA

MENGETAHUI PENGAWAS

1. RISMAN Z. 2. YON AFRIZAL 3. IDRUS


LAPORAN KEUANGAN PEMBANGUNAN RUMAH GADANG ALUMNI (RGA)
STM / SMKN 1 BUKITTINGGI
PERIODE MINGGU KE 1, 18 MARET 2019 S/D 7 APRIL 2019

JUMLAH UANG JUMLAH UANG


NO URAIAN TANGGAL SALDO (RP)
MASUK (RP) KELUAR (RP)
1 Posisi kas sesuai laporan terakhir 17 Maret 2019 290,895,000 279,156,200 11,738,800
2 Dana Masuk
Dari Sadiq C Abdillah via DPP Alumni STM/SMKN 1 BKT 01 April 2019 50,000,000 61,738,800
3 Dana Keluar
Bayar pek. Atap ke toko ANGGUN 02 April 2019 50,000,000 11,738,800
Jumlah 340,895,000 329,156,200 11,738,800

NB :
PEKERJAAN LANUTAN TAHAP I
PEMASANGAN ATAP TOTAL BIAYA Rp. 158,150,000
UANG MUKA Rp. 90,000,000
SISA Rp. 68,150,000

Bukittinggi, 7 April 2019


DISETUJUI OLEH DIBUAT OLEH

Ir MARDISON AHMAD HIDAYAT Hj.EVA RISNA


KETUA PEMBANGUNAN RGA SEKRETARIS/ PELAKSANA RGA BENDAHARA

MENGETAHUI PENGAWAS
1. RISMAN Z. 2. YON AFRIZAL 3. IDRUS
LAPORAN KEUANGAN PEMBANGUNAN RUMAH GADANG ALUMNI (RGA)
STM / SMKN 1 BUKITTINGGI
PERIODE MINGGU 2, 8 APRIL 2019 S/D 14 APRIL 2019

JUMLAH UANG JUMLAH UANG


NO URAIAN TANGGAL SALDO (RP)
MASUK (RP) KELUAR (RP)
1 Posisi kas sesuai laporan terakhir 07 April 2019 340,895,000 329,156,200 11,738,800
2 Dana Masuk
Dari Zetrialdi '82 via DPP Alumni STM/SMKN 1 BKT 11 April 2019 50,000,000 61,738,800
3 Dana Keluar
Bayar pek. Atap ke toko ANGGUN 11 April 2019 25,000,000 36,738,800
Jumlah 390,895,000 354,156,200 36,738,800

NB :
PEKERJAAN LANUTAN TAHAP I
PEMASANGAN ATAP TOTAL BIAYA Rp. 158,150,000
PEMBAYARAN S.D MINGGU KE 2 Rp. 115,000,000
SISA Rp. 43,150,000

Bukittinggi, 14 April 2019


DISETUJUI OLEH DIBUAT OLEH

Ir MARDISON AHMAD HIDAYAT Hj.EVA RISNA


KETUA PEMBANGUNAN RGA SEKRETARIS/ PELAKSANA RGA BENDAHARA

MENGETAHUI PENGAWAS
1. RISMAN Z. 2. YON AFRIZAL 3. IDRUS

LAPORAN KEUANGAN PEMBANGUNAN RUMAH GADANG ALUMNI (RGA)


STM / SMKN 1 BUKITTINGGI
PERIODE MINGGU 3, 15 APRIL 2019 S/D 21 APRIL 2019

JUMLAH UANG JUMLAH UANG


NO URAIAN TANGGAL SALDO (RP)
MASUK (RP) KELUAR (RP)

1 Posisi kas sesuai laporan terakhir 14 April 2019 390,895,000 354,156,200 36,738,800
2 Dana Masuk

3 Dana Keluar
a. Pembayaran penebangan kayu ke sdr Anto 15 April 2019 200,000 36,538,800
b. Pembayaran uang muka kunsen ke St Bagindo Perabot 16 April 2019 6,000,000 30,538,800
c. Pembayaran batu bata ke Saudara, 2000 bh 19 April 2019 2,200,000 28,338,800
d. Pembayaran pasir 9m3 ke sdr Mul 19 April 2019 1,350,000 26,988,800
e. Pembayaran semen 25 sak ke Toko SABAR 20 April 2010 1,550,000 25,438,800
PENERIMAAN MINGGU INI 0
PENGELUARAN MINGGU INI 11,300,000

Jumlah 390,895,000 365,456,200 25,438,800

NB :
PEKERJAAN LANUTAN TAHAP I
PEMASANGAN ATAP TOTAL BIAYA Rp. 158,150,000
PEMBAYARAN S.D MINGGU KE 2 Rp. 115,000,000
SISA Rp. 43,150,000
PEKERJAAN LANUTAN TAHAP II
PEK. DINDING BATA, PLESTER,ACI, KUNSEN PINTU DAN Rp. 99,568,950
JENDELA

Bukittinggi, 21 April 2019


DISETUJUI OLEH DIBUAT OLEH

Ir MARDISON AHMAD HIDAYAT Hj.EVA RISNA


KETUA PEMBANGUNAN RGA SEKRETARIS/ PELAKSANA RGA ` BENDAHARA

MENGETAHUI PENGAWAS

1. RISMAN Z. 2. YON AFRIZAL 3. IDRUS


LAPORAN KEUANGAN PEMBANGUNAN RUMAH GADANG ALUMNI (RGA)
STM / SMKN 1 BUKITTINGGI
PERIODE MINGGU 4, 22 APRIL 2019 S/D 28 APRIL 2019

JUMLAH UANG JUMLAH UANG


NO URAIAN TANGGAL SALDO (RP)
MASUK (RP) KELUAR (RP)

1 Posisi kas sesuai laporan terakhir 21 April 2019 390,895,000 365,456,200 25,438,800
2 Dana Masuk

3 Dana Keluar
a. Beli ember 1 lusin, Toko Restu Ibu 22 April 2019 100,000 25,338,800
b. Pembayaran kunsen, St Bagindo perabot 22 April 2019 7,000,000 18,338,800
c. Pembayaran kerikil 7 m3, Jaya Material 22 April 2019 1,225,000 17,113,800

d. Beli benang tk 1 pak&paku beton 1,5 inch, toko Muda Jaya 22 April 2019 70,000 17,043,800

e. Beli anti rayap 2 btl, toko Cahaya Tani 25 April 2019 70,000 16,973,800

f. Beli paku 5 inch untuk angker kunsen, toko Asaba 25 April 2019 50,000 16,923,800

g. Beli semprotan anti rayap, toko Yen Mart 25 April 2019 15,000 16,908,800
h. Beli kopi, gula&air untuk tukang 25 April 2019 50,000 16,858,800
i. Bayar gaji tukang ke 1 27 April 2010 1,650,000 15,208,800
PENERIMAAN MINGGU INI 0
PENGELUARAN MINGGU INI 10,230,000
TOTAL 390,895,000 375,686,200 15,208,800

NB :
PEKERJAAN LANUTAN TAHAP I
PEMASANGAN ATAP TOTAL BIAYA Rp. 158,150,000
PEMBAYARAN S.D MINGGU KE 2 Rp. 115,000,000
SISA Rp. 43,150,000

PEKERJAAN LANUTAN TAHAP II


PEK. DINDING BATA, PLESTER,ACI, KUNSEN PINTU DAN Rp. 99,568,950
JENDELA
A. PEMBAYARAN PENGADAAN KUNSEN KE 1 Rp. 6,000,000
B. PEMBAYARAN PENGADAAN KUNSEN KE 2 Rp. 7,000,000
C. UPAK PEK.DINDING BATA & PAS.KUNSEN KE 1 Rp. 1,650,000
D. PEMBELIAN MATERIAL Rp. 2,780,000
SISA Rp. 82,138,950 83,383,950

Bukittinggi, 28 April 2019


DISETUJUI OLEH DIBUAT OLEH

Ir MARDISON AHMAD HIDAYAT Hj.EVA RISNA


KETUA PEMBANGUNAN RGA SEKRETARIS/ PELAKSANA RGA ` BENDAHARA

MENGETAHUI PENGAWAS

1. RISMAN Z. 2. YON AFRIZAL 3. IDRUS


LAPORAN KEUANGAN PEMBANGUNAN RUMAH GADANG ALUMNI (RGA)
STM / SMKN 1 BUKITTINGGI
PERIODE MINGGU 5, 29 APRIL 2019 S/D 5 MEI 2019

JUMLAH UANG JUMLAH UANG


NO URAIAN TANGGAL SALDO (RP)
MASUK (RP) KELUAR (RP)

1 Posisi kas sesuai laporan terakhir 28 April 2019 390,895,000 375,686,200 15,208,800
2 Dana Masuk

Dana masuk dari Edmon Ilyas via DPP Alumni STMN/SMKN 1 BKT 02 Mei 2019 50,000,000 65,208,800

3 Dana Keluar
a. Beli kopi, gula&air untuk tukang 02 Mei 2019 50,000 65,158,800
b. ATK (kertas HVS, tinta printer, poto copy) 02 Mei 2019 100,000 65,058,800
c. Bayar DP ukiran singok ke SANGGAR
03 Mei 2019 5,000,000 60,058,800
- UKIRAN SAPALIN ke 1
d. Bayar scaffolding 4 set, Toko Jaya Material 03 Mei 2019 72,000 59,986,800
e. Beli paku campur 10 kg, Toko Jaya Material 03 Mei 2019 200,000 59,786,800
f. Beli reng taso skor kunsen , toko Anggun 04 Mei 2019 200,000 59,586,800
g. Bayar gaji tukang ke 1 04 Mei 2019 1,950,000 57,636,800
PENERIMAAN MINGGU INI 50,000,000
PENGELUARAN MINGGU INI 7,572,000
TOTAL 440,895,000 383,258,200 57,636,800

NB :
PEKERJAAN LANUTAN TAHAP I
PEMASANGAN ATAP TOTAL BIAYA Rp. 158,150,000
PEMBAYARAN S.D MINGGU KE 2 Rp. 115,000,000
SISA Rp. 43,150,000
PEKERJAAN LANUTAN TAHAP II
PEK. DINDING BATA, PLESTER,ACI, KUNSEN PINTU DAN Rp. 99,568,950
JENDELA
A. PEMBAYARAN PENGADAAN KUNSEN KE 1 Rp. 6,000,000
B. PEMBAYARAN PENGADAAN KUNSEN KE 2 Rp. 7,000,000
C. UPAK PEK.DINDING BATA & PAS.KUNSEN KE 1 Rp. 1,650,000
D. PEMBELIAN MATERIAL Rp. 2,780,000
E. UPAK PEK.DINDING BATA & PAS.KUNSEN KE 2 Rp. 1,950,000
F. PEMBELIAN MATERIAL Rp. 622,000 20,002,000
SISA Rp. 79,566,950 83,383,950

PEKERJAAN UKIRAN SINGOK Rp. 21,805,000


A. PEMBAYARAN UKIRAN KE 1 Rp. 5,000,000
SISA Rp. 16,805,000

Bukittinggi, 5 Mei 2019


DISETUJUI OLEH DIBUAT OLEH

Ir MARDISON AHMAD HIDAYAT Hj.EVA RISNA


KETUA PEMBANGUNAN RGA SEKRETARIS/ PELAKSANA RGA ` BENDAHARA

MENGETAHUI PENGAWAS

1. RISMAN Z. 2. YON AFRIZAL 3. IDRUS


LAPORAN KEUANGAN PEMBANGUNAN RUMAH GADANG ALUMNI (RGA)
STM / SMKN 1 BUKITTINGGI
PERIODE MINGGU 6, 6 MEI 2019 S/D 12 MEI 2019

JUMLAH UANG JUMLAH UANG


NO URAIAN TANGGAL SALDO (RP)
MASUK (RP) KELUAR (RP)

1 Posisi kas sesuai laporan terakhir 05 Mei 2019 440,895,000 383,258,200 57,636,800
2 Dana Masuk

3 Dana Keluar
a. Beli batu bata 2000, Toko SAUDARA JAYA 07 Mei 2019 2,200,000 55,436,800
b. Bayar DP kunsen (3), ST. BAGINDO PERABOT 08 Mei 2019 5,000,000 50,436,800
c. Beli semen 20 zak, pipa 3/4 AW 3 batang dan 2 bh elbow 3/4 11 Mei 2019 1,960,000 48,476,800
d. Bayar Scaffolding 4 set, JAYA MATERIAL (2) 11 Mei 2019 72,000 48,404,800
e. Bayar DP pekerjaan instalasi listrik 11 Mei 2019 500,000 47,904,800
f. Beli gergaji besi 11 Mei 2019 35,000 47,869,800
g. Beli kawat beton 1kg, sangkutan gembok 11 Mei 2019 33,000 47,836,800
h. Beli gembok 1 bh, JAYA MATERIAL 11 Mei 2019 15,000 47,821,800
i. Bayar gaji tukang ke 3 11 Mei 2019 2,440,000 45,381,800
PENERIMAAN MINGGU INI 0
PENGELUARAN MINGGU INI 12,255,000
TOTAL 440,895,000 395,513,200 45,381,800

NB :
PEKERJAAN LANUTAN TAHAP I
PEMASANGAN ATAP TOTAL BIAYA Rp. 158,150,000
PEMBAYARAN S.D MINGGU KE 2 Rp. 115,000,000
SISA Rp. 43,150,000
PEKERJAAN LANUTAN TAHAP II
PEK. DINDING BATA, PLESTER,ACI, KUNSEN PINTU DAN Rp. 99,568,950
JENDELA
A. PEMBAYARAN PENGADAAN KUNSEN KE 1 Rp. 6,000,000
B. PEMBAYARAN PENGADAAN KUNSEN KE 2 Rp. 7,000,000
C. UPAK PEK.DINDING BATA & PAS.KUNSEN KE 1 Rp. 1,650,000
D. PEMBELIAN MATERIAL Rp. 2,780,000
E. UPAK PEK.DINDING BATA & PAS.KUNSEN KE 2 1,950,000
F. PEMBELIAN MATERIAL 622,000 32,257,000
G. PEMBELIA MATERIAL 4,243,000
H. PEMBAYARAN PENGADAAN KUSEN KE 3 5,000,000
I. UPAH PEK.DINDING BATA & PAS.KUNSEN KE 3 2,440,000
J. BAYAR DP INSTALASI LISTRIK 500,000
K. BAYAR SCAFFOLDING KE 2 72,000
SISA Rp. 67,311,950 83,383,950

PEKERJAAN UKIRAN SINGOK 21,805,000


A. PEMBAYARAN UKIRAN KE 1 5,000,000
SISA 16,805,000

Bukittinggi, 12 Mei 2019


DISETUJUI OLEH DIBUAT OLEH

Ir MARDISON AHMAD HIDAYAT Hj.EVA RISNA


KETUA PEMBANGUNAN RGA SEKRETARIS/ PELAKSANA RGA ` BENDAHARA

MENGETAHUI PENGAWAS
1. RISMAN Z. 2. YON AFRIZAL 3. IDRUS
LAPORAN KEUANGAN PEMBANGUNAN RUMAH GADANG ALUMNI (RGA)
STM / SMKN 1 BUKITTINGGI
PERIODE MINGGU 7, 13 MEI 2019 S/D 19 MEI 2019

JUMLAH UANG JUMLAH UANG


NO URAIAN TANGGAL SALDO (RP)
MASUK (RP) KELUAR (RP)

1 Posisi kas sesuai laporan terakhir 12 Mei 2019 440,895,000 395,513,200 45,381,800
2 Dana Masuk
Dana masuk minggu ini dari bpk Mabrur M 13 Mei 2019 200,000 45,581,800
3 Dana Keluar
a. Beli paku beton 3 inch, 2 bh elbow 3/4, Toko SINAR TOFARI JAYA 13 Mei 2019 30,000 45,551,800
b. Beli Pasir 9 m3, JAYA MATERIAL 14 Mei 2019 1,350,000 44,201,800
c. Beli slang 1/2 inci 10m, soket 3/4 inci 1 bh, TOKO GANTIANG BARU 14 Mei 2019 83,500 44,118,300
d. Bayar Scaffolding 4 set, JAYA MATERIAL (2) 14 Mei 2019 72,000 44,046,300
e. Bayar DP pekerjaan instalasi listrik 15 Mei 2019 2,000,000 42,046,300
f. Beli bambu pjg 7m 35 btg, ST SIKUMBANG 16 Mei 2019 700,000 41,346,300
g. Beli mata bor beton 6 mm 1bh, mata gerinda potong 1 bh, Toko Sari Baru 16 Mei 2019 33,000 41,313,300
h. Bayar DP ukiran ke 2 , Sanggar Tigo Sapilin 18 Mei 2019 5,000,000 36,313,300
i. Bayar gaji tukang ke 4 19 Mei 2019 5,020,000 31,293,300
PENERIMAAN MINGGU INI 200,000
PENGELUARAN MINGGU INI 14,288,500
TOTAL 441,095,000 409,801,700 31,023,300

NB :
PEKERJAAN LANUTAN TAHAP I
PEMASANGAN ATAP TOTAL BIAYA Rp. 158,150,000
PEMBAYARAN S.D MINGGU KE 2 Rp. 115,000,000
SISA Rp. 43,150,000
PEKERJAAN LANUTAN TAHAP II
PEK. DINDING BATA, PLESTER,ACI, KUNSEN PINTU DAN Rp. 99,568,950
JENDELA
A. PEMBAYARAN PENGADAAN KUNSEN KE 1,2&3 Rp. 18,000,000
B. UPAK PEK.DINDING BATA & PAS.KUNSEN KE 1 Rp. 1,650,000
C. PEMBELIAN MATERIAL 1,2,3 Rp. 7,645,000
D. UPAK PEK.DINDING BATA & PAS.KUNSEN KE 2 Rp. 1,950,000
E. UPAH PEK.DINDING BATA & PAS.KUNSEN KE 3 Rp. 2,440,000
F. BAYAR DP INSTALASI LISTRIK ke 1 & 2 Rp. 2,500,000
G. BAYAR SCAFFOLDING KE 1 & 2 Rp. 144,000
H. PEMBELIAN MATERIAL MINGGU KE 4 Rp. 2,163,000 41,584,000
I. BAYAR SCAFFOLDING KE 3 Rp. 72,000
J. UPAH PEK.DINDING BATA & PAS.KUNSEN KE 4 Rp. 5,020,000
SISA Rp. 57,984,950 83,383,950

PEKERJAAN UKIRAN SINGOK 21,805,000


A. PEMBAYARAN UKIRAN KE 1 5,000,000
A. PEMBAYARAN UKIRAN KE 1 5,000,000
SISA 11,805,000

Bukittinggi, 19 Mei 2019


DISETUJUI OLEH DIBUAT OLEH

Ir MARDISON AHMAD HIDAYAT Hj.EVA RISNA


KETUA PEMBANGUNAN RGA SEKRETARIS/ PELAKSANA RGA ` BENDAHARA

MENGETAHUI PENGAWAS
1. RISMAN Z. 2. YON AFRIZAL 3. IDRUS
KET.

7 April 2019
KET.

14 April 2019
KET.
21 April 2019
KET.
28 April 2019
KET.
5 Mei 2019
KET.
12 Mei 2019
KET.
19 Mei 2019