od i .STANDAR JEMBATAN BAJA BMI
( 8M1 Standard Steel Bridges }
I, STANDAR JEMBATAN RANGKA BAJA PERMANEN 30 - 60M
(Standard Permanent Truss Bridges 30 - 60 M)
embaten Rengke Boje Permanen type rangka Warren dengan panjang
tiap segmen 5 m dan ruang bebes vertikal minimel 6,1 m, Stem lantai dari baten
‘Warran type permanant Truss Bridges with Sm long segment and minimal
vertical clearance of 5,1 m, Bridge flooring system uses concrete
ISOMETAIC VIEW
End Portal
Raling
Bottom Chore
Petongan Meintang Jembatan Rangka Kelas A & B
Kolas A
SPESIFIKASI TEKNIK TECHNICAL SPECIFICATION
Keles erbatan Adan B * Bridge class A and B
1 Seb eetnanmengosuepesiites! BVS7-C.2 BN 100%) + Leading syetam refer to EMS? -C2 (BM 100%)
/SKSNI 1-02-2005) / SK.SNIT-02-2005)
= Sistem penyambungan memakai baut mutu tinggi + Joint system uses high strength bolts
+ Materiel pesifcasi dan gavenis mengacs + Matenal spoctneation end galvanizing conform te
Standar internesional ASTM / JIS / AS 7650 international standard ASTM / JS /AS 1630
+ Pre Chamber 150 76 beban mati + Pre Chambered 160 %e dead oad
[Ey] sJombatan Baia | Gekie Metal IrdustiesIl. STANDAR JEMBATAN BAJA KELAS C DAN SEMI PERMANEN
(Steel Bridges Class C and Semi Permanent Bridges)
Jembatan Aengka Baja Kelas C den Semi Permanen bentang 3U ~ 80 m, untuk satu jalur lalulintas
‘Kedua tipe jembatan rangka baja ini mengacu pade standar Bina Marge dengan ruang bebas vertikal 51m
dan lebar untuk lentai kendaraan 3,5 m.
See! Bridges class C and Sami Permanent Bridgos with 30 ~ 60m span,
for ane traffic lane, Dimension conforms ta Bina Merce Stendard
(indonesian Highway and Transpore Oficial) with 5,1 m minimal vertical
Gleerance and 3,5 m wide traific lane.
Tep Wind Bracing
Bettim Chore
Bearing asserroy
Timber Dace Loveral st
sts Sesame gutter
‘SPESIFIKASI TEKNIK TECHNICAL SPECIFICATION
‘+ Kelas Jemhatan C dan Seri Permanen “Briigo class C and Gemi Permanent
‘+ Pombotanan mangacu spocifikasi BMS7.C2 Loading refer ta SMS7 - G2 (70 %] /SK DNI 702-2005
(6M 70%) / Sk SNITO22005 Joint system uses high strengtn batts
‘+ Sistim peryamoungan memake! bauc muou tinggi ‘Material specication and gaivanizing conform ta
‘+ Material spesifixasi den galvenis mengacu international standard ASTM/JIS /AS 1650
stendar internasional ASTM / JIS /AS 1850 * Pre -Chambered 150 % dead load.
+ Pre - Chamber 150% beban mati
Il STANDAR JEMBATAN GELAGAR BAJA
embetan sistim gelagar pilin untuk kebebasan ruang dan kemungkinan untuk peleberan dimasa mendatang,
Benzang antara 15 ~ Om. Ssstim lantal dari beton,
Grrder bridge for better cleerence flexibility snd possiblity of wioth extension,
with span between 15 ~ 30m. Concrete deck systern.
Corcreta Deck
‘Shear Studs
Comecter
Disphrogm Grder Bean
Broha
SPESIFIKAS! TEKNIK TECHNICAL SPECIFICATION
+ Kelas jembatan AB dan + Bridge class A, Band C-
+ Pombabaren mengacu spesikasi BMS7.C2 * Loading systern refer to BMS7-G2 (aM 100%)
(8M 100%] / SKSNIT.022005 / SKSNI 702-2005
+ Sistim penyambungan memakai baut mutu tingsl + “doin system uses high strenath bolt
+ Material spaifieasi den gavanis mengacu + Material sneciication ard ga\anizing conform to
standar internacional ASTM / JIS/AS 1660 international standerd ASTM / JIS /AS 1850
+ Pre- Chamber 150% beben mati (segmental den curved), + Pre -Chambered 150% dead load (segmentel and curved)
ombacan ej | Beir Meiel neutres [3Potongan Melintang Jembatan Girder Kelas A, B & C
Jembatan Grder Kelas A Jembaten Ginter Kelas C
IV. STANDAR JEMBATAN PANEL
[Standard Panel Bridges}
embatan panel ini bersifat semi permanen, sistim sembungan mengaunakan pin dan baut
iantal jmbavan bisa mengguriaken plet bow / Keyu, standar bantang jembatan 15 6/451 m
dengan modul per panel Sm dengan ruang bebas horisortal &,7m
This panel bridge is permanent, joirt system using
bolts & pin. Bridge deck could use steel plates or timber
‘Standar bridge seans 75 to 5 with modules per panel 3m and
horizontal slearance 3,7 ™
‘SPESIFIKASI TEKNIK TECHNICAL SPECIFICATION
* Kelas Jembatan Semi Permanen -C “Saree elles semi perenent CO
‘+ Ruang bebas Horisontal 3,7 m * Horizontal clearance 371m
+ Pembebanan Spesifikasi BMS 7-C2 (EM 70%) + Loading refer to BIVS 7-C.2 (BM 70%)
(/ SKSN1 02-2005
/ SKEN) FO22005
= Penyambungan dengan pin danbaut mutu tinggi * Uoint eyeter uses high strength bots & pin
‘+ Material spesifkasi den gaivenis mengacu * Material specification and galvanizing conform to
tender internasional ASTM / JIS /AS 1650 incemnational standerd ASTM / JiS /A8 1650
+ Secara otomatss terbentuk Pre - Chamber ‘+ Pre - Chambered condizion will be autamaticaly
pada saat pomasangen. formed during nstallation,
[2] sombatan Baia | Batre Metal hdisesV. STANDAR JEMBATAN GELAGAR BOX BAJA (Steel Box Girder)
Jembatan Sistem Gelagar Box Baja ini bisa digunakan untule
bentang antare 25 - 50 m, dengan sistem lantai dari beton
The Bridge with this steel box girder can be applied for
25 - 50 metres using concrete deck system
‘SPESIFIKASI TEKNIK
eles jembatan A, B dan C
embebanan mengacu spesifitasi EVS7-C2 100%
/SKSNIT(02- 2005
Penyemouncan dengan baut mutu tinggi
Finishing oermukaan galvanis atau di cet
Material spesfikasi dan gavanie mangecu stander
incornasional ASTM / JIS / AS 1850
Pre-ciamber 150% beban mat
TECHNICAL SPECIFICATION
Bridge cless A Band C
Loading refer to AMS? -C.2 100%
/SKSMITO2 - 2005
eine system uses high strength bots.
Surface fhishing galvanized or painted
‘Materia! specication and gelvenizing conform to
‘internetional standard ASTM / JIG / AS 1650
Phe - chambered 150% deed load
VIA. STANDAR JEMBATAN RANGKA BAJA PERMANEN 65 - 100 M.
(STANDARD OF THE PERMANENT TRUSS BRIDGES 65 - 100M)
Tipe jemibatan ini merupakan pargembangan dari jembatan medel rangka warren yang dipersiapkan
untuk éapat memenuhi kebutuhan jembatan dengan bentong diatas 60 m. Bentang jembatan tipe
ini dimulai dari tentang 85 hingga 100 M.
Pengslarman Proyek PT. Sakrie Mezal Induszries untuk Jembatan Rangka Baja Permanen BS - 100
Main:
+ Jembetan Rengka A 80 M PT. Adhi Karya
+ dembatan Rengka B 80M & C 100 MPT. Deye Bumindo Karunia
+ dembatan Rangka A 80 M & 8 80M Dinas Pekerjasn Umum Papua
> dembatan Rangka C 80 M PT. Siner Mas (Thi,
- dembatan Rengka A 70 M PT. Baramulti Group
This bridge is @ developing type of warren truss bridges which is prepared to fulfllthe need of an over
60m bridge spen. Tne bricge span starts fram 65 m until 100m.
PT. Bakrie Metal Industries Project Experiences far Permanent Truss
Bridges 65- 100m are
- ABOM Truss Bridge, PT: Adhi Kerya y
> BBOME C100 M Truss Bridge, PT Daya Bumindo Karunip
ABD M Truss Bridge & B80 IM, Dinas Pelenaen Umum Pag g
+ €80M Truss Bridge, PT Sinar Mas (Tek)
- 70M Truss Bridge, PT. Bararmulti Group
SPESIFIKASI TEKNIK
Kelasjembatan A, 8 dan
Pembetanan mengacu spesificasi BMS7 -C.2 100%
/ SKSNITO2 - 2005
Penyambungan dengan baut mutu tinggi
Finishing permukaan galvenis atau di cat
TECHNICAL SPECIFICATION
Bridge class A, Bard C
Loading refer to 8MS7-C2 100%
/SKSNI 102-2005
oint system uses high strength hofts
Surface finishing galvanized or painted
Material spesifkasi den galvenis mengacu standar
internasional ASTM / JIS / AS 1650
Pre - chamber 160% beban mati
‘Meterial specification and galvanizing conform to
incernational standard ASTM / JIS / AS +650
Pre- chambered 150% deed loed
dembatan Baia | Bacris Metal ncusiries [5VIB. Standar Jembatan Pelengkung 100 - 200 M.
(Standard of the Arch Bridges 100 - 200 M)
‘Untuk kondisi sunga yang cukup lebar, memerlukan penggunaan desain jembatan khusus dengan
bentang yang panjeng. Dimulai dari bentang 100 - 200 (meter), jembatan rangka Pelengkung
merupakan suatu solusi yang cukup efisien untuk memenuninya
Fengelarnan Proyek PT, Bakrie Metal Industries untuk Jembatan Pelengkung 100-200 M antara
tein
_ Jembetan Pelengkung Mahakam Ulu A 200 M, Samerinca
~ Jemibatan Pelengkung Batang Tebo A 128 M, Jambi
= Jembsten Pelengkung Batang Hari il A 150 M, Palembang
For a quite wide river condition it requires to use special type of long bridge pan. Starts from spans
700 -200 M, the arch bridge is an eificient solution to fulfil
PT. Bakrie Metel Industries Project Experiences for Arch Bridges 100 - 206 M are :
= Mahakam Ulu A 200M Arch Bridge, Samarinda
~ Batang Tebo A 128 M Arch Bridge, Jambi
= Batang Hari A 150 MArch Bridgo, Palembang
SPESIFIKAS! TEKNIK TECHNICAL SPECIFICATION
Kelas jembeten 48.8 Bridge class A & B
Pembebanan mengacu spesifiasi BMS7 -C.2 100° Leading refer to 8MS7-C.2 100%
/ SKSNIT.02- 2005 /SKSNI T02 - 2005
Penyambungan dengen bout mutu tinggi Join system uses high strength bolts
Finishing permukaan galvanis ateu di cat Surface finishing gahanized ar painted
Material epasifixasi den galvanis mengacu standar Material specication and galvanizing conform to
internasional ASTM / JI8/ AS 1650 international standard ASTM / JIS / AS 1650
T] semboran Boje | Bolo Metal ares
LTABEL JEMBATAN BMI ( BMI Steel Bridge Table )
KELAS MUATAN /
LOADNG cLass
BENTANG MINIMUM/ | 30m | 30m | som | 15m] 15m | 15m 30M 8M | 8M | BM | tom | tom | tom
MINIVUM SPAN
PAWANG seoMeN/ | 5m | 5m | 5m aM 25M | 25m | 25M
SEGMENT LENGTH
BENTANG maksivUM/ | 60M | som | com | som | som | som €oM 25M] 25m | 25m | 25m | 25m | 25M
MAXIMUM SPAN
SISTEM LANTAL / CONCRETE + BRIDGE DECK | CONCRETE + BRIDGE DECK TIMBER CONCRETE + BRIDGE DECK | CONCRETE] ccncrETE/ | TIMBER
DECK SYSTEM TWEER
LEBAR LANTAI :
IKENDARAAN / 7M | 6M ps-4smM) 7m | 6M fs-25M 35M 712m] 6-12”) 45-6m] sm | asm | asm
TRAFFIC DECK
WIDTH
LEAR TROTOAR / ‘mx J05 we |05 mxe] axe | osMxe [05 mxe 0.5 Mx2 axe Jos mxe|os mxel anne Jos mxe 0.5 mxe
FOOT PATH WOTH
PERLINDUNGAN / GALVANIZED GALVANIZED GALVANIZED /PAINTED GALVANIZED GALVANIZED /PAINTED
SURFACE PROTECTION
PEMASANGAN / PERANCAH / KANTILEVER PELUNCUR PERANCAH / KANTILEVER | PELUNCUR/ PERANCAH | PELUNCUR./ PERANCAH
INSTALLATION FORM WORK / CANTILEVER CRANE FOR WORK/ CANTILEVER | CRANE /FORM WORK | CRANE / FORM WORK
NOTE
IMENERIWA PESANAN KHUSUS / SPECIAL ORDER:
PENYEBERANGAN JALAN / PEDESTRIAN CROSSING BRIDGES
JEMBATAN KHUSUS SALJPAN PPA / SPECIAL PPE BRIDGES
Jambatan in| Beir etl neucrien [7* Drawing
* Nesting
* Diling
« Assembling
+ WeldingNeen
PENGALAMAN KERJA PROYEK JEMBATAN PT. BMI
al panies ens Fe Tessenatn {ler aie Ti
(Prince a) Gets eer
RT Soa GT eee TTR | ah nee | aT
Ponae
= [rcRROR ETO rapa ieten eg Te pa Tae |
a ro = aaa ies | Taha ee | aT
ein ener eeooont
7 [RNR sn Soa aaa Tae zo7 |i
Tea Ee |e aaa os aan | a
Hei el i
7 | Re RoR Popa nea a Ses Taba a
rer
7 aT ean eae
L eau |
7 Ra Festa ane Jeanne
FRR RCS TANGLE eg Soar
Sia Ue Hi
| VEIT RPS | Pima Sere Pope Tahun | SURBAL
7 ean apa ona aa Tae] ore
cmomee
ton
B | OF mRGTRPRIRTIO | eoagza eta EES aa aa Taree | ane
remo og rn) oon
cam ented
a eset nan ae rae Tonio | A
| sestar ul
| ER aan nod ‘ibe ra aI |
7 | A RTT aaa a rae Te | a]
7 aT aia a Tern ae “Bie | ES
maa
5 FRA TSUN | PE Sr re SRS RRST | RON) awARaT
lpr supa
7 SRR TSSRE evar omen ae Sea aT | Tea | NT
seinen Som
oma TOOL sare aS a a
| SEO BES ANA | pan a ae ro a aaa
7 [RUE ENGIN |Paein aN Koch Saas ar Ta | nk
3 EO a RS | ES ES ett Saas aa | aR
musteoun Bre et
STE iio tape
3 | OMT aaa FS ae “aa HRORTE
7 | GRRE am er Ta SRT | RT
enone ton
leet
: ee cee as
(oe ee
Ben oo
= aaa eid reas Tania | ac
Seog
‘pees sine
tech |
Slates aianesarincn | romani iat Toman cory Tuna | arson
un nsioul, ora
a femoumsnn Feaanrenenn re commana | temzen | paawe:
Jemtatan Bui | Bake Metalitusos [3]Jombeten Baja | Bairie Metal industriesLictakaa terete
wit
‘Merak @ Baaraa a
Jembatan Beja | Bole Mts ndevios
aLater nits tlre)
Commercial Office / Factory :
aT ro cles stg ean aU ota
Coe re ec ra Ae ee
come Ob eae (Hunting) Fox.: (021) 889.58586 / 8896.0685
Eee een een cei eon ose