JUMLAH
PPN 10%
JUMLAH TOTAL
DIBULATKAN
TERBILANG : Sembilan Milyar Dua Ratus Dua Puluh Delapan Juta Tujuh Ratus Dua Puluh Empat Ribu Rupiah
Banjarmasin, Septembe
Kuasa Pengguna Anggaran Konsultan Perencan
DINAS KEHUTANAN TAMAN HUTAN RAYA SULTAN ADAM CV. BORNEO MEGAH CONS
Jumlah
1,625,133,889.18
1,169,603,200.12
678,937,595.47
924,700,387.02
680,912,610.61
549,802,627.90
967,684,406.11
377,129,445.09
384,250,346.22
347,268,285.31
129,124,842.41
129,124,842.41
254,386,437.31
100,419,700.80
71,271,330.87
8,389,749,946.85
838,974,994.69
9,228,724,941.54
9,228,724,000.00
Wa
Bobot % Bulan I Bulan II Bulan III
1 2 3 4 1 2 3 4 1
19.37 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94
13.94
8.09 0.90
8.12 1.01
6.55
4.58 0.76
4.14
1.54
1.54
1.20
100.00
3.9 3.9 3.9 3.9 6.0 6.0 5.4 5.2 6.4
0 3.9 7.8 11.7 15.5 21.5 27.4 32.9 38.1 44.5
NAAN PEKERJAAN
Waktu pelaksanaan
Bulan III Bulan IV Bulan V
2 3 4 1 2 3 4 1 2 3
1.94
0.56 0.56
0.26
6.4 4.5 3.9 4.7 3.5 4.1 4.1 2.9 2.9 3.2
50.9 55.3 59.2 63.9 67.4 71.6 75.7 78.6 81.5 84.7
an V Bulan VI KET
4 1 2 3 4
0.82
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN TANAH Rp
III PEKERJAAN PONDASI DAN BETON BERTULANG Rp
IV PEKERJAAN PASANGAN DINDING DAN LANTAI Rp
V PEKERJAAN ATAP DAN PLAFOND Rp
VI PEKERJAAN KUSEN PINTU DAN JENDELA Rp
VII PEKERJAAN ELECTRICAL Rp
VIII PEKERJAAN SANITASI Rp
IX PEKERJAAN CAT - CATAN Rp
JUMLAH Rp
Jumlah
6,000,000.00
80,632,728.82
379,554,828.88
438,998,154.22
504,807,415.93
68,257,500.00
13,920,490.00
16,440,508.15
116,522,263.18
1,625,133,889.18
REKAPITULASI BIAYA
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN TANAH Rp
III PEKERJAAN PONDASI DAN BETON BERTULANG Rp
IV PEKERJAAN PASANGAN DINDING DAN LANTAI Rp
V PEKERJAAN ATAP DAN PLAFOND Rp
VI PEKERJAAN KUSEN PINTU DAN JENDELA Rp
VII PEKERJAAN ELECTRICAL Rp
VIII PEKERJAAN SANITASI Rp
IX PEKERJAAN CAT - CATAN Rp
JUMLAH Rp
Jumlah
6,000,000.00
64,594,431.59
313,649,539.64
238,524,017.16
411,082,602.78
46,060,000.00
14,040,880.00
10,291,246.40
65,360,482.55
1,169,603,200.12
REKAPITULASI BIAYA
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN TANAH Rp
III PEKERJAAN PONDASI DAN BETON BERTULANG Rp
IV PEKERJAAN PASANGAN DINDING DAN LANTAI Rp
V PEKERJAAN ATAP DAN PLAFOND Rp
VI PEKERJAAN KUSEN PINTU DAN JENDELA Rp
VII PEKERJAAN ELECTRICAL Rp
VIII PEKERJAAN SANITASI Rp
IX PEKERJAAN CAT - CATAN Rp
JUMLAH Rp
Jumlah
6,000,000.00
35,375,217.30
271,235,473.31
133,675,571.11
116,989,613.89
35,237,500.00
12,476,380.00
2,587,357.30
65,360,482.55
678,937,595.47
REKAPITULASI BIAYA
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN TANAH Rp
III PEKERJAAN PONDASI DAN BETON BERTULANG Rp
IV PEKERJAAN PASANGAN DINDING DAN LANTAI Rp
V PEKERJAAN ATAP DAN PLAFOND Rp
VI PEKERJAAN KUSEN PINTU DAN JENDELA Rp
VII PEKERJAAN ELECTRICAL Rp
VIII PEKERJAAN SANITASI Rp
IX PEKERJAAN CAT - CATAN Rp
JUMLAH Rp
Jumlah
6,000,000.00
64,594,431.59
313,649,539.64
178,452,565.61
245,069,984.51
55,432,500.00
7,555,750.00
11,055,583.61
42,890,032.06
924,700,387.02
REKAPITULASI BIAYA
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN TANAH Rp
III PEKERJAAN PONDASI DAN BETON BERTULANG Rp
IV PEKERJAAN PASANGAN DINDING DAN LANTAI Rp
V PEKERJAAN ATAP DAN PLAFOND Rp
VI PEKERJAAN KUSEN PINTU DAN JENDELA Rp
VII PEKERJAAN ELECTRICAL Rp
VIII PEKERJAAN SANITASI Rp
IX PEKERJAAN CAT - CATAN Rp
JUMLAH Rp
Jumlah
6,000,000.00
28,586,146.04
149,006,472.35
155,633,835.11
242,400,873.60
36,972,500.00
6,680,800.00
16,582,036.34
39,049,947.17
680,912,610.61
REKAPITULASI BIAYA
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN TANAH Rp
III PEKERJAAN PONDASI DAN BETON BERTULANG Rp
IV PEKERJAAN PASANGAN DINDING DAN LANTAI Rp
V PEKERJAAN ATAP DAN PLAFOND Rp
VI PEKERJAAN KUSEN PINTU DAN JENDELA Rp
VII PEKERJAAN ELECTRICAL Rp
VIII PEKERJAAN SANITASI Rp
IX PEKERJAAN CAT - CATAN Rp
JUMLAH Rp
Jumlah
6,000,000.00
21,721,940.09
109,190,507.33
132,742,619.61
193,925,719.91
35,002,500.00
5,860,960.00
13,072,037.50
32,286,343.46
549,802,627.90
REKAPITULASI BIAYA
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN TANAH Rp
III PEKERJAAN PONDASI DAN BETON BERTULANG Rp
IV PEKERJAAN PASANGAN DINDING DAN LANTAI Rp
V PEKERJAAN ATAP DAN PLAFOND Rp
VI PEKERJAAN KUSEN PINTU DAN JENDELA Rp
VII PEKERJAAN ELECTRICAL Rp
VIII PEKERJAAN CAT - CATAN Rp
JUMLAH Rp
Jumlah
6,000,000.00
47,455,111.61
201,520,901.96
229,977,155.00
358,670,672.51
55,292,500.00
9,336,810.00
59,431,255.03
967,684,406.11
REKAPITULASI BIAYA
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN TANAH Rp
III PEKERJAAN PONDASI DAN BETON BERTULANG Rp
IV PEKERJAAN PASANGAN DINDING DAN LANTAI Rp
V PEKERJAAN ATAP DAN PLAFOND Rp
VI PEKERJAAN KUSEN PINTU DAN JENDELA Rp
VII PEKERJAAN ELECTRICAL Rp
VIII PEKERJAAN CAT - CATAN Rp
JUMLAH Rp
Jumlah
6,000,000.00
14,471,423.62
78,064,183.91
75,500,642.00
156,159,509.06
25,342,500.00
2,779,710.00
18,811,476.50
377,129,445.09
REKAPITULASI BIAYA
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN TANAH Rp
III PEKERJAAN PONDASI DAN BETON BERTULANG Rp
IV PEKERJAAN PASANGAN DINDING DAN LANTAI Rp
V PEKERJAAN ATAP DAN PLAFOND Rp
VI PEKERJAAN KUSEN PINTU DAN JENDELA Rp
VII PEKERJAAN ELECTRICAL Rp
VIII PEKERJAAN SANITASI Rp
IX PEKERJAAN CAT - CATAN Rp
JUMLAH Rp
Jumlah
6,000,000.00
16,000,352.84
87,347,047.41
76,134,554.34
167,816,642.71
6,862,500.00
2,106,340.00
1,194,634.00
20,788,274.91
384,250,346.22
REKAPITULASI BIAYA
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN TANAH Rp
III PEKERJAAN PONDASI DAN BETON BERTULANG Rp
IV PEKERJAAN PASANGAN DINDING DAN LANTAI Rp
V PEKERJAAN ATAP DAN PLAFOND Rp
VI PEKERJAAN KUSEN PINTU DAN JENDELA Rp
VII PEKERJAAN ELECTRICAL Rp
VIII PEKERJAAN CAT - CATAN Rp
JUMLAH Rp
Jumlah
6,000,000.00
16,000,352.84
52,781,961.87
90,473,037.06
148,642,153.00
6,542,500.00
2,656,510.00
24,171,770.54
347,268,285.31
REKAPITULASI BIAYA
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN TANAH Rp
III PEKERJAAN PONDASI DAN BETON BERTULANG Rp
IV PEKERJAAN PASANGAN DINDING DAN LANTAI Rp
V PEKERJAAN ATAP DAN PLAFOND Rp
VI PEKERJAAN KUSEN PINTU DAN JENDELA Rp
VII PEKERJAAN ELECTRICAL Rp
VIII PEKERJAAN SANITASI Rp
IX PEKERJAAN CAT - CATAN Rp
JUMLAH Rp
Jumlah
6,000,000.00
4,095,296.50
36,063,107.83
28,808,803.42
31,432,723.30
6,165,000.00
2,113,160.00
9,932,411.00
4,514,340.36
129,124,842.41
REKAPITULASI BIAYA
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN TANAH Rp
III PEKERJAAN PONDASI DAN BETON BERTULANG Rp
IV PEKERJAAN PASANGAN DINDING DAN LANTAI Rp
V PEKERJAAN ATAP DAN PLAFOND Rp
VI PEKERJAAN KUSEN PINTU DAN JENDELA Rp
VII PEKERJAAN ELECTRICAL Rp
VIII PEKERJAAN SANITASI Rp
IX PEKERJAAN CAT - CATAN Rp
JUMLAH Rp
Jumlah
6,000,000.00
4,095,296.50
64,075,366.75
46,884,875.70
105,169,405.84
7,497,500.00
1,998,450.00
6,991,524.70
11,674,017.82
254,386,437.31
REKAPITULASI BIAYA
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN TANAH Rp
III PEKERJAAN PONDASI DAN BETON BERTULANG Rp
IV PEKERJAAN PASANGAN DINDING DAN LANTAI Rp
V PEKERJAAN ATAP DAN PLAFOND Rp
VI PEKERJAAN KUSEN PINTU DAN JENDELA Rp
VII PEKERJAAN ELECTRICAL Rp
VIII PEKERJAAN CAT - CATAN Rp
JUMLAH Rp
Jumlah
6,000,000.00
1,793,267.83
25,955,036.63
19,976,482.81
34,089,883.52
5,956,800.00
697,790.00
5,950,440.01
100,419,700.80
REKAPITULASI BIAYA
I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN TANAH Rp
III PEKERJAAN PONDASI DAN BETON BERTULANG Rp
IV PEKERJAAN PASANGAN DINDING DAN LANTAI Rp
V PEKERJAAN ELECTRICAL Rp
VII PEKERJAAN CAT - CATAN Rp
JUMLAH Rp
Jumlah
6,000,000.00
1,254,920.63
52,584,629.88
1,830,948.35
3,650,392.00
5,950,440.01
71,271,330.87
RENCANA ANGGARAN BIAYA
PROGRAM :
KEGIATAN :
LOKASI : KOTA BANJARBARU
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu 1.00 Paket
2 Perlengkapan K3 1.00 Paket
B PEKERJAAN TANAH
1 Galian Tanah 47.09 m3
2 Urugan Pasir Bawah Pondasi 6.21 m3
3 Urugan Kembali + Pemadatan 23.55 m3
4 Urugan Tanah Bawah Lantai 232.32 m3
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak 61.00 Titik
2 MCB Listrik 1 Phase 1.00 bh
3 Lampu SL 25 WATT 18.00 bh
4 Lampu Downlight 9 Watt 18.00 bh
5 Stop Kontak 15.00 bh
6 Saklar Tunggal 6.00 bh
7 Saklar Ganda 3.00 bh
H PEKERJAAN SANITASI
1 Instalasi Air Kotor Pipa AW 4" 2.00 Titik
2 Instalasi Air Bekas Pipa AW 2" 3.00 Titik
3 Instalasi Air Bersih Pipa AW 3/4" 3.00 Titik
4 Pipa AW 4" 10.30 m'
5 Pipa AW 2" 20.10 m'
6 Pipa AW 3/4" 28.00 m'
7 Septictank Biofil Kapasitas 6 - 8 Orang 2.00 bh
8 Sink Cuci Piring Stainless 1.00 bh
9 Kran Air 3.00 bh
10 Kran air leher angsa Ø 1/2" 1.00 bh
11 Kloset Jongkok 3.00 bh
12 Floor Drain 3.00 bh
3,000,000.00 3,000,000.00
3,000,000.00 3,000,000.00
Total 6,000,000.00
150,000.00 26,197,500.00
3,500,000.00 3,500,000.00
1,800,000.00 10,800,000.00
1,350,000.00 4,050,000.00
800,000.00 1,600,000.00
1,600,000.00 14,400,000.00
2,500,000.00 7,500,000.00
35,000.00 210,000.00
Total 68,257,500.00
176,000.00 10,736,000.00
50,000.00 50,000.00
94,050.00 1,692,900.00
47,500.00 855,000.00
22,330.00 334,950.00
25,740.00 154,440.00
32,400.00 97,200.00
Total 13,920,490.00
178,750.00 357,500.00
178,750.00 536,250.00
143,000.00 429,000.00
71,814.60 739,690.38
33,161.70 666,550.17
10,639.20 297,897.60
5,000,000.00 10,000,000.00
450,000.00 450,000.00
73,700.00 221,100.00
253,000.00 253,000.00
739,090.00 2,217,270.00
90,750.00 272,250.00
Total 16,440,508.15
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu 1.00 Paket
2 Perlengkapan K3 1.00 Paket
B PEKERJAAN TANAH
1 Galian Tanah 34.24 m3
2 Urugan Pasir Bawah Pondasi 4.52 m3
3 Urugan Kembali + Pemadatan 17.12 m3
4 Urugan Tanah Bawah Lantai 188.76 m3
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak 62.00 Titik
2 MCB Listrik 1 Phase 1.00 bh
3 Lampu SL 25 WATT 12.00 bh
4 Lampu Downlight 9 Watt 32.00 bh
5 Stop Kontak 8.00 bh
6 Saklar Tunggal 6.00 bh
7 Saklar Ganda 3.00 bh
H PEKERJAAN SANITASI
1 Instalasi Air Kotor Pipa AW 4" 5.20 Titik
2 Instalasi Air Bekas Pipa AW 2" 5.00 Titik
3 Instalasi Air Bersih Pipa AW 3/4" 10.50 Titik
4 Pipa AW 4" 1.00 m'
5 Pipa AW 2" 2.00 m'
6 Pipa AW 3/4" 2.00 m'
7 Septictank Biofil Kapasitas 6 - 8 Orang 1.00 bh
8 Kran Air 2.00 bh
9 Kloset Jongkok 2.00 bh
10 Floor Drain 2.00 bh
I PEKERJAAN CAT - CATAN
1 Pengecatan Dinding 513.78 m2
2 Pengecatan Plafond 188.58 m2
3 Pengecatan Railing Beton 25.60 m2
4 Pengecatan Pilar Beton 61.04 m2
5 Pengecatan Pilis Ukir Ulin 11.53 m2
6 Pengecatan Layang - Layang Ulin 1.60 m2
7 Pengecatan Ornamen Pilis 3.40 m2
Harga Jumlah
Analis Satuan Harga
(Rp) (Rp)
3,000,000.00 3,000,000.00
3,000,000.00 3,000,000.00
Total 6,000,000.00
150,000.00 16,770,000.00
3,500,000.00 3,500,000.00
1,800,000.00 3,600,000.00
1,350,000.00 4,050,000.00
800,000.00 1,600,000.00
1,600,000.00 6,400,000.00
2,500,000.00 10,000,000.00
35,000.00 140,000.00
Total 46,060,000.00
176,000.00 10,912,000.00
50,000.00 50,000.00
94,050.00 1,128,600.00
47,500.00 1,520,000.00
22,330.00 178,640.00
25,740.00 154,440.00
32,400.00 97,200.00
Total 14,040,880.00
178,750.00 929,500.00
178,750.00 893,750.00
143,000.00 1,501,500.00
71,814.60 71,814.60
33,161.70 66,323.40
10,639.20 21,278.40
5,000,000.00 5,000,000.00
73,700.00 147,400.00
739,090.00 1,478,180.00
90,750.00 181,500.00
Total 10,291,246.40
81,458.00 41,851,287.60
81,458.00 15,361,553.29
81,458.00 2,085,324.80
81,458.00 4,972,326.65
65,932.15 760,329.50
65,932.15 105,491.43
65,932.15 224,169.29
Total 65,360,482.55
RENCANA ANGGARAN BIAYA
PROGRAM :
KEGIATAN :
LOKASI : KOTA BANJARBARU
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu 1.00 Paket
2 Perlengkapan K3 1.00 Paket
B PEKERJAAN TANAH
1 Galian Tanah 21.61 m3
2 Urugan Pasir Bawah Pondasi 2.85 m3
3 Urugan Kembali + Pemadatan 10.81 m3
4 Urugan Tanah Bawah Lantai 101.20 m3
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak 55.00 Titik
2 MCB Listrik 1 Phase 1.00 bh
3 Lampu SL 25 WATT 12.00 bh
4 Lampu Downlight 9 Watt 25.00 bh
5 Stop Kontak 8.00 bh
6 Saklar Tunggal 6.00 bh
7 Saklar Ganda 3.00 bh
H PEKERJAAN SANITASI
1 Instalasi Air Bekas Pipa AW 2" 2.00 Titik
2 Instalasi Air Bersih Pipa AW 3/4" 8.00 Titik
3 Pipa AW 2" 5.00 m'
4 Pipa AW 3/4" 14.00 m'
5 Kran Air 8.00 bh
6 Floor Drain 2.00 bh
3,000,000.00 3,000,000.00
3,000,000.00 3,000,000.00
Total 6,000,000.00
150,000.00 9,487,500.00
1,800,000.00 5,400,000.00
2,500,000.00 20,000,000.00
35,000.00 350,000.00
Total 35,237,500.00
176,000.00 9,680,000.00
50,000.00 50,000.00
94,050.00 1,128,600.00
47,500.00 1,187,500.00
22,330.00 178,640.00
25,740.00 154,440.00
32,400.00 97,200.00
Total 12,476,380.00
178,750.00 357,500.00
143,000.00 1,144,000.00
33,161.70 165,808.50
10,639.20 148,948.80
73,700.00 589,600.00
90,750.00 181,500.00
Total 2,587,357.30
81,458.00 41,851,287.60
81,458.00 15,361,553.29
81,458.00 2,085,324.80
81,458.00 4,972,326.65
65,932.15 760,329.50
Total 65,030,821.83
RENCANA ANGGARAN BIAYA
PROGRAM :
KEGIATAN :
LOKASI : KOTA BANJARBARU
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu 1.00 Paket
2 Perlengkapan K3 1.00 Paket
B PEKERJAAN TANAH
1 Galian Tanah 21.50 m3
2 Urugan Pasir Bawah Pondasi 2.84 m3
3 Urugan Kembali + Pemadatan 10.75 m3
4 Urugan Tanah Bawah Lantai 89.32 m3
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak 33.00 Titik
2 MCB Listrik 1 Phase 1.00 bh
3 Lampu SL 25 WATT 13.00 bh
4 Stop Kontak 8.00 bh
5 Saklar Tunggal 9.00 bh
6 Saklar Ganda 2.00 bh
H PEKERJAAN SANITASI
1 Instalasi Air Kotor Pipa AW 4" 2.00 Titik
2 Instalasi Air Bekas Pipa AW 2" 4.00 Titik
3 Instalasi Air Bersih Pipa AW 3/4" 4.00 Titik
4 Pipa AW 4" 8.00 m'
5 Pipa AW 2" 7.30 m'
6 Pipa AW 3/4" 17.00 m'
7 Septictank Biofil Kapasitas 6 - 8 Orang 1.00 bh
8 Sink Cuci Piring Stainless 1.00 bh
9 Kran Air 3.00 bh
10 Kran air leher angsa Ø 1/2" 1.00 bh
11 Kloset Jongkok 3.00 bh
12 Floor Drain 3.00 bh
I PEKERJAAN CAT - CATAN
1 Pengecatan Dinding 415.64 m2
2 Pengecatan Plafond 91.48 m2
3 Pengecatan Pilar Beton 6.78 m2
4 Pengecatan Pilis Ukir Ulin 8.58 m2
5 Pengecatan Layang - Layang Ulin 1.60 m2
6 Pengecatan Ornamen Pilis 3.40 m2
Harga Jumlah
Analis Satuan Harga
(Rp) (Rp)
3,000,000.00 3,000,000.00
3,000,000.00 3,000,000.00
Total 6,000,000.00
150,000.00 20,032,500.00
3,500,000.00 3,500,000.00
1,350,000.00 8,100,000.00
800,000.00 2,400,000.00
1,600,000.00 6,400,000.00
2,500,000.00 15,000,000.00
35,000.00 -
Total 55,432,500.00
176,000.00 5,808,000.00
50,000.00 50,000.00
94,050.00 1,222,650.00
22,330.00 178,640.00
25,740.00 231,660.00
32,400.00 64,800.00
Total 7,555,750.00
178,750.00 357,500.00
178,750.00 715,000.00
143,000.00 572,000.00
71,814.60 574,516.80
33,161.70 242,080.41
10,639.20 180,866.40
5,000,000.00 5,000,000.00
450,000.00 450,000.00
73,700.00 221,100.00
253,000.00 253,000.00
739,090.00 2,217,270.00
90,750.00 272,250.00
Total 11,055,583.61
F.1 81,458.00 33,857,203.12
F.1 81,458.00 7,451,777.84
F.1 81,458.00 552,480.74
F.1 81,458.00 698,909.64
F.2 65,932.15 105,491.43
F.2 65,932.15 224,169.29
Total 42,890,032.06
RENCANA ANGGARAN BIAYA
PROGRAM :
KEGIATAN :
LOKASI : KOTA BANJARBARU
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu 1.00 Paket
2 Perlengkapan K3 1.00 Paket
B PEKERJAAN TANAH
1 Galian Tanah 18.54 m3
2 Urugan Pasir Bawah Pondasi 2.45 m3
3 Urugan Kembali + Pemadatan 9.27 m3
4 Urugan Tanah Bawah Lantai 80.96 m3
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak 29.00 Titik
2 MCB Listrik 1 Phase 1.00 bh
3 Lampu SL 25 WATT 12.00 bh
4 Stop Kontak 4.00 bh
5 Saklar Tunggal 12.00 bh
H PEKERJAAN SANITASI
1 Instalasi Air Kotor Pipa AW 4" 4.00 Titik
2 Instalasi Air Bekas Pipa AW 2" 4.00 Titik
3 Instalasi Air Bersih Pipa AW 3/4" 4.00 Titik
4 Pipa AW 4" 8.00 m'
5 Pipa AW 2" 5.00 m'
6 Pipa AW 3/4" 21.20 m'
7 Septictank Biofil Kapasitas 6 - 8 Orang 2.00 bh
8 Kran Air 4.00 bh
9 Kloset Jongkok 4.00 bh
10 Floor Drain 4.00 bh
3,000,000.00 3,000,000.00
3,000,000.00 3,000,000.00
Total 6,000,000.00
150,000.00 11,692,500.00
1,350,000.00 5,400,000.00
800,000.00 3,200,000.00
1,600,000.00 6,400,000.00
2,500,000.00 10,000,000.00
35,000.00 280,000.00
Total 36,972,500.00
176,000.00 5,104,000.00
50,000.00 50,000.00
94,050.00 1,128,600.00
22,330.00 89,320.00
25,740.00 308,880.00
Total 6,680,800.00
178,750.00 715,000.00
178,750.00 715,000.00
143,000.00 572,000.00
71,814.60 574,516.80
33,161.70 165,808.50
10,639.20 225,551.04
5,000,000.00 10,000,000.00
73,700.00 294,800.00
739,090.00 2,956,360.00
90,750.00 363,000.00
Total 16,582,036.34
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu 1.00 Paket
2 Perlengkapan K3 1.00 Paket
B PEKERJAAN TANAH
1 Galian Tanah 15.72 m3
2 Urugan Pasir Bawah Pondasi 2.07 m3
3 Urugan Kembali + Pemadatan 7.86 m3
4 Urugan Tanah Bawah Lantai 60.28 m3
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak 25.00 Titik
2 MCB Listrik 1 Phase 1.00 bh
3 Lampu SL 25 WATT 10.00 bh
4 Stop Kontak 6.00 bh
5 Saklar Tunggal 6.00 bh
6 Saklar Ganda 2.00 bh
H PEKERJAAN SANITASI
1 Instalasi Air Kotor Pipa AW 4" 2.00 Titik
2 Instalasi Air Bekas Pipa AW 2" 3.00 Titik
3 Instalasi Air Bersih Pipa AW 3/4" 3.00 Titik
4 Pipa AW 4" 5.50 m'
5 Pipa AW 2" 4.00 m'
6 Pipa AW 3/4" 12.00 m'
7 Septictank Biofil Kapasitas 6 - 8 Orang 1.00 bh
8 Sink Cuci Piring Stainless 1.00 bh
9 Kran Air 2.00 bh
10 Kran air leher angsa Ø 1/2" 1.00 bh
11 Kloset Duduk 1.00 bh
12 Kloset Jongkok 1.00 bh
13 Floor Drain 2.00 bh
I PEKERJAAN CAT - CATAN
1 Pengecatan Dinding 305.68 m2
2 Pengecatan Plafond 72.65 m2
3 Pengecatan Pilar Beton 6.78 m2
4 Pengecatan Pilis Ukir Ulin 6.41 m2
5 Pengecatan Pilis Ulin 2.49 m2
6 Pengecatan Layang - Layang Ulin 1.60 m2
7 Pengecatan Ornamen Pilis 3.40 m2
Harga Jumlah
Analis Satuan Harga
(Rp) (Rp)
3,000,000.00 3,000,000.00
3,000,000.00 3,000,000.00
Total 6,000,000.00
150,000.00 11,062,500.00
1,800,000.00 1,800,000.00
1,350,000.00 5,400,000.00
800,000.00 1,600,000.00
2,500,000.00 15,000,000.00
35,000.00 140,000.00
Total 35,002,500.00
176,000.00 4,400,000.00
50,000.00 50,000.00
94,050.00 940,500.00
47,500.00 285,000.00
22,330.00 133,980.00
25,740.00 51,480.00
Total 5,860,960.00
178,750.00 357,500.00
178,750.00 536,250.00
143,000.00 429,000.00
71,814.60 394,980.30
33,161.70 132,646.80
10,639.20 127,670.40
5,000,000.00 5,000,000.00
450,000.00 450,000.00
73,700.00 147,400.00
253,000.00 253,000.00
739,090.00 739,090.00
4,323,000.00 4,323,000.00
90,750.00 181,500.00
Total 13,072,037.50
F.1 81,458.00 24,900,081.44
F.1 81,458.00 5,917,720.06
F.1 81,458.00 552,480.74
F.2 65,932.15 422,493.19
F.2 65,932.15 163,907.31
F.2 65,932.15 105,491.43
F.2 65,932.15 224,169.29
Total 32,286,343.46
RENCANA ANGGARAN BIAYA
PROGRAM :
KEGIATAN :
LOKASI : KOTA BANJARBARU
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu 1.00 Paket
2 Perlengkapan K3 1.00 Paket
B PEKERJAAN TANAH
1 Galian Tanah 25.25 m3
2 Urugan Pasir Bawah Pondasi 3.33 m3
3 Urugan Kembali + Pemadatan 12.63 m3
4 Urugan Tanah Bawah Lantai 138.60 m3
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak 39.00 Titik
2 MCB Listrik 1 Phase 1.00 bh
3 Lampu SL 25 WATT 19.00 bh
4 Stop Kontak 8.00 bh
5 Saklar Tunggal 8.00 bh
6 Saklar Ganda 3.00 bh
3,000,000.00 3,000,000.00
3,000,000.00 3,000,000.00
Total 6,000,000.00
150,000.00 14,992,500.00
1,800,000.00 5,400,000.00
1,350,000.00 5,400,000.00
4,500,000.00 4,500,000.00
2,500,000.00 25,000,000.00
Total 55,292,500.00
176,000.00 6,864,000.00
50,000.00 50,000.00
94,050.00 1,786,950.00
47,500.00 380,000.00
22,330.00 178,640.00
25,740.00 77,220.00
Total 9,336,810.00
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu 1.00 Paket
2 Perlengkapan K3 1.00 Paket
B PEKERJAAN TANAH
1 Galian Tanah 7.74 m3
2 Urugan Pasir Bawah Pondasi 1.02 m3
3 Urugan Kembali + Pemadatan 3.87 m3
4 Urugan Tanah Bawah Lantai 42.24 m3
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak 12.00 Titik
2 MCB Listrik 1 Phase 1.00 bh
3 Lampu SL 25 WATT 5.00 bh
4 Stop Kontak 4.00 bh
5 Saklar Tunggal 1.00 bh
6 Saklar Ganda 1.00 bh
3,000,000.00 3,000,000.00
3,000,000.00 3,000,000.00
Total 6,000,000.00
150,000.00 7,192,500.00
1,800,000.00 1,800,000.00
1,350,000.00 1,350,000.00
2,500,000.00 15,000,000.00
Total 25,342,500.00
176,000.00 2,112,000.00
50,000.00 50,000.00
94,050.00 470,250.00
22,330.00 89,320.00
25,740.00 25,740.00
32,400.00 32,400.00
Total 2,779,710.00
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu 1.00 Paket
2 Perlengkapan K3 1.00 Paket
B PEKERJAAN TANAH
1 Galian Tanah 9.21 m3
2 Urugan Pasir Bawah Pondasi 1.22 m3
3 Urugan Kembali + Pemadatan 4.61 m3
4 Urugan Tanah Bawah Lantai 46.20 m3
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak 9.00 Titik
2 MCB Listrik 1 Phase 1.00 bh
3 Lampu SL 25 WATT 4.00 bh
4 Stop Kontak 2.00 bh
5 Saklar Tunggal 2.00 bh
H PEKERJAAN SANITASI
1 Instalasi Air Bekas Pipa AW 2" 1.00 Titik
2 Instalasi Air Bersih Pipa AW 3/4" 1.00 Titik
3 Pipa AW 2" 4.00 m'
4 Pipa AW 3/4" 3.50 m'
5 Sink Cuci Piring Stainless 1.00 bh
6 Kran air leher angsa Ø 1/2" 1.00 bh
3,000,000.00 3,000,000.00
3,000,000.00 3,000,000.00
Total 6,000,000.00
150,000.00 2,662,500.00
1,800,000.00 1,800,000.00
800,000.00 800,000.00
1,600,000.00 1,600,000.00
Total 6,862,500.00
176,000.00 1,584,000.00
50,000.00 50,000.00
94,050.00 376,200.00
22,330.00 44,660.00
25,740.00 51,480.00
Total 2,106,340.00
178,750.00 178,750.00
143,000.00 143,000.00
33,161.70 132,646.80
10,639.20 37,237.20
450,000.00 450,000.00
253,000.00 253,000.00
Total 1,194,634.00
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu 1.00 Paket
2 Perlengkapan K3 1.00 Paket
B PEKERJAAN TANAH
1 Galian Tanah 12.87 m3
2 Urugan Pasir Bawah Pondasi 1.08 m3
3 Urugan Kembali + Pemadatan 6.44 m3
4 Urugan Tanah Bawah Lantai 9.00 m3
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak 11.00 Titik
2 MCB Listrik 1 Phase 1.00 bh
3 Lampu SL 25 WATT 6.00 bh
4 Stop Kontak 1.00 bh
5 Saklar Tunggal 2.00 bh
6 Saklar Ganda 1.00 bh
3,000,000.00 3,000,000.00
3,000,000.00 3,000,000.00
Total 6,000,000.00
150,000.00 1,927,500.00
1,800,000.00 1,800,000.00
1,600,000.00 1,600,000.00
250,000.00 1,215,000.00
Total 6,542,500.00
176,000.00 1,936,000.00
50,000.00 50,000.00
94,050.00 564,300.00
22,330.00 22,330.00
25,740.00 51,480.00
32,400.00 32,400.00
Total 2,656,510.00
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu 1.00 Paket
2 Perlengkapan K3 1.00 Paket
B PEKERJAAN TANAH
1 Galian Tanah 4.89 m3
2 Urugan Pasir Bawah Pondasi 0.65 m3
3 Urugan Kembali + Pemadatan 2.45 m3
4 Urugan Tanah Bawah Lantai 9.90 m3
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak 9.00 Titik
2 MCB Listrik 1 Phase 1.00 bh
3 Lampu SL 25 WATT 4.00 bh
4 Saklar Tunggal 4.00 bh
H PEKERJAAN SANITASI
1 Instalasi Air Kotor Pipa AW 2" 3.00 Titik
2 Instalasi Air Kotor Pipa AW 4" 3.00 Titik
3 Instalasi Air Bersih Pipa AW 3/4" 3.00 Titik
4 Pipa AW 2" 6.00 m'
5 Pipa AW 4" 6.00 m'
6 Pipa AW 3/4" 8.50 m'
7 Septictank Biofil Kapasitas 6 - 8 Orang 1.00 bh
8 Kran Air 3.00 bh
9 Kloset Jongkok 3.00 bh
10 Floor Drain 3.00 bh
3,000,000.00 3,000,000.00
3,000,000.00 3,000,000.00
Total 6,000,000.00
150,000.00 2,010,000.00
1,350,000.00 4,050,000.00
35,000.00 105,000.00
Total 6,165,000.00
176,000.00 1,584,000.00
50,000.00 50,000.00
94,050.00 376,200.00
25,740.00 102,960.00
Total 2,113,160.00
178,750.00 536,250.00
178,750.00 536,250.00
143,000.00 429,000.00
71,814.60 430,887.60
33,161.70 198,970.20
10,639.20 90,433.20
5,000,000.00 5,000,000.00
73,700.00 221,100.00
739,090.00 2,217,270.00
90,750.00 272,250.00
Total 9,932,411.00
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu 1.00 Paket
2 Perlengkapan K3 1.00 Paket
B PEKERJAAN TANAH
1 Galian Tanah 7.51 m3
2 Urugan Pasir Bawah Pondasi 0.99 m3
3 Urugan Kembali + Pemadatan 3.75 m3
4 Urugan Tanah Bawah Lantai 31.68 m3
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak 9.00 Titik
2 MCB Listrik 1 Phase 5.00 bh
3 Lampu SL 25 WATT 1.00 bh
4 Stop Kontak 2.00 bh
5 Saklar Tunggal 1.00 bh
H PEKERJAAN SANITASI
1 Instalasi Air Kotor Pipa AW 4" 1.00 Titik
2 Instalasi Air Bekas Pipa AW 2" 1.00 Titik
3 Instalasi Air Bersih Pipa AW 3/4" 2.00 Titik
4 Pipa AW 4" 2.00 m'
5 Pipa AW 2" 3.00 m'
6 Pipa AW 3/4" 12.00 m'
7 Septictank Biofil Kapasitas 6 - 8 Orang 1.00 bh
8 Kran Air 2.00 bh
9 Kloset Jongkok 1.00 bh
10 Floor Drain 1.00 bh
3,000,000.00 3,000,000.00
3,000,000.00 3,000,000.00
Total 6,000,000.00
150,000.00 2,677,500.00
1,800,000.00 1,800,000.00
1,350,000.00 1,350,000.00
1,600,000.00 1,600,000.00
35,000.00 70,000.00
Total 7,497,500.00
176,000.00 1,584,000.00
50,000.00 250,000.00
94,050.00 94,050.00
22,330.00 44,660.00
25,740.00 25,740.00
Total 1,998,450.00
178,750.00 178,750.00
178,750.00 178,750.00
143,000.00 286,000.00
71,814.60 143,629.20
33,161.70 99,485.10
10,639.20 127,670.40
5,000,000.00 5,000,000.00
73,700.00 147,400.00
739,090.00 739,090.00
90,750.00 90,750.00
Total 6,991,524.70
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu 1.00 Paket
2 Perlengkapan K3 1.00 Paket
B PEKERJAAN TANAH
1 Galian Tanah 5.01 m3
2 Urugan Pasir Bawah Pondasi 0.42 m3
3 Urugan Kembali + Pemadatan 2.50 m3
4 Urugan Tanah Bawah Lantai 2.50 m3
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak 3.00 Titik
2 MCB Listrik 1 Phase 1.00 bh
3 Lampu SL 25 WATT 1.00 bh
4 Saklar Tunggal 1.00 bh
3,000,000.00 3,000,000.00
3,000,000.00 3,000,000.00
Total 6,000,000.00
1,285,000.00 1,285,000.00
1,167,950.00 4,671,800.00
Total 5,956,800.00
176,000.00 528,000.00
50,000.00 50,000.00
94,050.00 94,050.00
25,740.00 25,740.00
Total 697,790.00
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu 1.00 Paket
2 Perlengkapan K3 1.00 Paket
B PEKERJAAN TANAH
1 Galian Tanah 5.01 m3
2 Urugan Pasir Bawah Pondasi 0.92 m3
3 Urugan Kembali + Pemadatan 2.50 m3
E PEKERJAAN SANITASI
1 Instalasi Pipa Air Bersih AW 3/4" 2.00 Titik
2 Pipa Air Bersih AW 3/4" 10.00 m'
3 Pompa Air 1.00 bh
4 Tutup Bak Kontrol Plat Besi 1.00 bh
3,000,000.00 3,000,000.00
3,000,000.00 3,000,000.00
Total 6,000,000.00
143,000.00 286,000.00
10,639.20 106,392.00
1,758,000.00 1,758,000.00
1,500,000.00 1,500,000.00
Total 3,650,392.00
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu
2 Perlengkapan K3
B PEKERJAAN TANAH
1 Galian Tanah 0.65 x
2 Urugan Pasir Bawah Pondasi 0.60 x
3 Urugan Kembali + Pemadatan 47.09 :
4 Urugan Tanah Bawah Lantai 24.00 x
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak
2 MCB Listrik 1 Phase
3 Lampu SL 25 WATT
4 Lampu Downlight 9 Watt
5 Stop Kontak
6 Saklar Tunggal
7 Saklar Ganda
H PEKERJAAN SANITASI
1 Instalasi Air Kotor Pipa AW 4"
2 Instalasi Air Bekas Pipa AW 2"
3 Instalasi Air Bersih Pipa AW 3/4"
4 Pipa AW 4"
5 Pipa AW 2"
6 Pipa AW 3/4"
7 Septictank Biofil Kapasitas 6 - 8 Orang
8 Sink Cuci Piring Stainless
9 Kran Air
10 Kran air leher angsa Ø 1/2"
11 Kloset Jongkok
12 Floor Drain
1.00 Paket
1.00 Paket
61.00 Titik
1.00 bh
18.00 bh
18.00 bh
15.00 bh
6.00 bh
3.00 bh
2.00 Titik
3.00 Titik
3.00 Titik
10.30 m'
20.10 m'
28.00 m'
2.00 bh
1.00 bh
3.00 bh
1.00 bh
3.00 bh
3.00 bh
1043.68 m2
241.73 m2
0.80 48.32 m2
3.14 x 0.20 x 2.70 x 24.00 81.39 m2
69.75 13.95 m2
1.00 x 4.00 x 2.00 1.60 m2
0.50 x 4.00 x 2.00 3.40 m2
NO URAIAN PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu
2 Perlengkapan K3
B PEKERJAAN TANAH
1 Galian Tanah 0.65 x
2 Urugan Pasir Bawah Pondasi 0.60 x
3 Urugan Kembali + Pemadatan 34.24 :
4 Urugan Tanah Bawah Lantai 13.00 x
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak
2 MCB Listrik 1 Phase
3 Lampu SL 25 WATT
4 Lampu Downlight 9 Watt
5 Stop Kontak
6 Saklar Tunggal
7 Saklar Ganda
H PEKERJAAN SANITASI
1 Instalasi Air Kotor Pipa AW 4"
2 Instalasi Air Bekas Pipa AW 2"
3 Instalasi Air Bersih Pipa AW 3/4"
4 Pipa AW 4"
5 Pipa AW 2"
6 Pipa AW 3/4"
7 Septictank Biofil Kapasitas 6 - 8 Orang
8 Kran Air
9 Kloset Jongkok
10 Floor Drain
1.00 Paket
1.00 Paket
62.00 Titik
1.00 bh
12.00 bh
32.00 bh
8.00 bh
6.00 bh
3.00 bh
2.00 Titik
2.00 Titik
2.00 Titik
5.20 m'
5.00 m'
10.50 m'
1.00 bh
2.00 bh
2.00 bh
2.00 bh
513.78 m2
188.58 m2
0.80 25.60 m2
3.14 x 0.20 x 2.70 x 18.00 61.04 m2
57.66 11.53 m2
1.00 x 4.00 x 2.00 1.60 m2
0.50 x 4.00 x 2.00 3.40 m2
NO URAIAN PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu
2 Perlengkapan K3
B PEKERJAAN TANAH
1 Galian Tanah 0.65 x
2 Urugan Pasir Bawah Pondasi 0.60 x
3 Urugan Kembali + Pemadatan 21.61 :
4 Urugan Tanah Bawah Lantai 10.00 x
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak
2 MCB Listrik 1 Phase
3 Lampu SL 25 WATT
4 Lampu Downlight 9 Watt
5 Stop Kontak
6 Saklar Tunggal
7 Saklar Ganda
H PEKERJAAN SANITASI
1 Instalasi Air Bekas Pipa AW 2"
2 Instalasi Air Bersih Pipa AW 3/4"
3 Pipa AW 2"
4 Pipa AW 3/4"
5 Kran Air
6 Floor Drain
1.00 Paket
1.00 Paket
3.23 x 2 27.74
4.43 x 2 33.67
Total 61.40
61.40 m2
2.7 x 4 15.66 m2
15.66 m2
4.00 30.62 m'
7.60 x 4 47.60 m'
113.60 m2
113.60 m2
113.20 m'
4.20 x 3 13.50
6.00 x 8 49.75
63.25 m'
3.00 bh
8.00 bh
10.00 bh
55.00 Titik
1.00 bh
12.00 bh
25.00 bh
8.00 bh
6.00 bh
3.00 bh
2.00 Titik
8.00 Titik
5.00 m'
14.00 m'
8.00 bh
2.00 bh
272.48 m2
129.26 m2
0.80 15.52 m2
3.14 x 0.20 x 2.70 x 10.00 33.91 m2
47.60 9.52 m2
NO URAIAN PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu
2 Perlengkapan K3
Err:509 Err:509
B PEKERJAAN TANAH
1 Galian Tanah 0.65 x
2 Urugan Pasir Bawah Pondasi 0.60 x
3 Urugan Kembali + Pemadatan 21.50 :
4 Urugan Tanah Bawah Lantai 13.00 x
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak
2 MCB Listrik 1 Phase
3 Lampu SL 25 WATT
4 Stop Kontak
5 Saklar Tunggal
6 Saklar Ganda
H PEKERJAAN SANITASI
1 Instalasi Air Kotor Pipa AW 4"
2 Instalasi Air Bekas Pipa AW 2"
3 Instalasi Air Bersih Pipa AW 3/4"
4 Pipa AW 4"
5 Pipa AW 2"
6 Pipa AW 3/4"
7 Septictank Biofil Kapasitas 6 - 8 Orang
8 Sink Cuci Piring Stainless
9 Kran Air
10 Kran air leher angsa Ø 1/2"
11 Kloset Jongkok
12 Floor Drain
1.00 Paket
1.00 Paket
1.00 Err:509
33.00 Titik
1.00 bh
13.00 bh
8.00 bh
9.00 bh
2.00 bh
2.00 Titik
4.00 Titik
4.00 Titik
8.00 m'
7.30 m'
17.00 m'
1.00 bh
1.00 bh
3.00 bh
1.00 bh
3.00 bh
3.00 bh
415.64 m2
91.48 m2
3.14 x 0.20 x 2.70 x 2.00 6.78 m2
42.90 8.58 m2
1.00 x 4.00 x 2.00 1.60 m2
0.50 x 4.00 x 2.00 3.40 m2
NO URAIAN PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu
2 Perlengkapan K3
B PEKERJAAN TANAH
1 Galian Tanah 0.65 x
2 Urugan Pasir Bawah Pondasi 0.60 x
3 Urugan Kembali + Pemadatan 18.54 :
4 Urugan Tanah Bawah Lantai 16.00 x
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak
2 MCB Listrik 1 Phase
3 Lampu SL 25 WATT
4 Stop Kontak
5 Saklar Tunggal
H PEKERJAAN SANITASI
1 Instalasi Air Kotor Pipa AW 4"
2 Instalasi Air Bekas Pipa AW 2"
3 Instalasi Air Bersih Pipa AW 3/4"
4 Pipa AW 4"
5 Pipa AW 2"
6 Pipa AW 3/4"
7 Septictank Biofil Kapasitas 6 - 8 Orang
4 Kran Air
9 Kloset Jongkok
10 Floor Drain
1.00 Paket
1.00 Paket
29.00 Titik
1.00 bh
12.00 bh
4.00 bh
12.00 bh
4.00 Titik
4.00 Titik
4.00 Titik
8.00 m'
5.00 m'
21.20 m'
2.00 bh
4.00 bh
4.00 bh
4.00 bh
370.20 m2
78.98 m2
3.14 x 0.20 x 2.70 x 5.00 16.96 m2
46.06 9.21 m2
1.00 x 4.00 x 2.00 1.60 m2
0.50 x 4.00 x 2.00 3.40 m2
NO URAIAN PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu
2 Perlengkapan K3
B PEKERJAAN TANAH
1 Galian Tanah 0.65 x
2 Urugan Pasir Bawah Pondasi 0.60 x
3 Urugan Kembali + Pemadatan 15.72 :
4 Urugan Tanah Bawah Lantai 9.00 x
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak
2 MCB Listrik 1 Phase
3 Lampu SL 25 WATT
4 Stop Kontak
5 Saklar Tunggal
6 Saklar Ganda
H PEKERJAAN SANITASI
1 Instalasi Air Kotor Pipa AW 4"
2 Instalasi Air Bekas Pipa AW 2"
3 Instalasi Air Bersih Pipa AW 3/4"
4 Pipa AW 4"
5 Pipa AW 2"
6 Pipa AW 3/4"
7 Septictank Biofil Kapasitas 6 - 8 Orang
8 Sink Cuci Piring Stainless
9 Kran Air
10 Kran air leher angsa Ø 1/2"
11 Kloset Duduk
12 Kloset Jongkok
13 Floor Drain
1.00 Paket
1.00 Paket
3.85 9.05
3.00 5.55
1.95 3.61
2.85 x 3.00 24.37
3.00 8.55
1.50 4.73
Total 55.85 m2
1.50 x 2.00 16.80 m2
1.35 x 2.00 16.80 m2
5.22 x 2.00 + 5.75 + 6.68 151.16 m2
151.16 m2
10.80 m'
4.00 bh
2.00 + 5.22 x 2.00 32.04 m'
6.68 12.43 m'
4.00 bh
16.80 72.65 m2
72.65 m2
92.40 m'
25.00 Titik
1.00 bh
10.00 bh
6.00 bh
6.00 bh
2.00 bh
2.00 Titik
3.00 Titik
3.00 Titik
5.50 m'
4.00 m'
12.00 m'
1.00 bh
1.00 bh
2.00 bh
1.00 bh
1.00 bh
1.00 bh
2.00 bh
305.68 m2
72.65 m2
3.14 x 0.20 x 2.70 x 2.00 6.78 m2
32.04 6.41 m2
12.43 2.49 m2
1.00 x 4.00 x 2.00 1.60 m2
0.50 x 4.00 x 2.00 3.40 m2
NO URAIAN PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu
2 Perlengkapan K3
B PEKERJAAN TANAH
1 Galian Tanah 0.65 x
2 Urugan Pasir Bawah Pondasi 0.60 x
3 Urugan Kembali + Pemadatan 25.25 :
4 Urugan Tanah Bawah Lantai 21.00 x
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak
2 MCB Listrik 1 Phase
3 Lampu SL 25 WATT
4 Stop Kontak
5 Saklar Tunggal
6 Saklar Ganda
1.00 Paket
1.00 Paket
39.00 Titik
1.00 bh
19.00 bh
8.00 bh
8.00 bh
3.00 bh
534.16 m2
146.41 m2
0.80 8.32 m2
3.14 x 0.20 x 2.70 x 8.00 27.13 m2
58.90 11.78 m2
1.00 x 4.00 x 2.00 1.60 m2
0.50 x 4.00 x 2.00 3.40 m2
NO URAIAN PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu
2 Perlengkapan K3
B PEKERJAAN TANAH
1 Galian Tanah 0.65 x
2 Urugan Pasir Bawah Pondasi 0.60 x
3 Urugan Kembali + Pemadatan 7.74 :
4 Urugan Tanah Bawah Lantai 6.00 x
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak
2 MCB Listrik 1 Phase
3 Lampu SL 25 WATT
4 Stop Kontak
5 Saklar Tunggal
6 Saklar Ganda
1.00 Paket
1.00 Paket
3.85 22.52
3.85 22.52
Total 45.05 m2
12.00 Titik
1.00 bh
5.00 bh
4.00 bh
1.00 bh
1.00 bh
176.86 m2
45.05 m2
30.78 6.16 m2
1.00 x 4.00 x 2.00 1.60 m2
0.50 x 4.00 x 2.00 3.40 m2
NO URAIAN PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu
2 Perlengkapan K3
0 0
B PEKERJAAN TANAH
1 Galian Tanah 0.65 x
2 Urugan Pasir Bawah Pondasi 0.60 x
3 Urugan Kembali + Pemadatan 9.21 :
4 Urugan Tanah Bawah Lantai 12.00 x
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak
2 MCB Listrik 1 Phase
3 Lampu SL 25 WATT
4 Stop Kontak
5 Saklar Tunggal
H PEKERJAAN SANITASI
1 Instalasi Air Bekas Pipa AW 2"
2 Instalasi Air Bersih Pipa AW 3/4"
3 Pipa AW 2"
4 Pipa AW 3/4"
5 Sink Cuci Piring Stainless
6 Kran air leher angsa Ø 1/2"
1.00 Paket
1.00 Paket
1.00 0
3.85 34.07
3.85 10.97
3.00 4.50
49.55 m2
9.00 Titik
1.00 bh
4.00 bh
2.00 bh
2.00 bh
1.00 Titik
1.00 Titik
4.00 m'
3.50 m'
1.00 bh
1.00 bh
176.69 m2
53.55 m2
0.80 8.32 m2
3.14 x 0.20 x 2.70 x 2.00 6.78 m2
35.94 7.19 m2
1.00 x 4.00 x 2.00 1.60 m2
0.50 x 4.00 x 2.00 3.40 m2
NO URAIAN PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu
2 Perlengkapan K3
B PEKERJAAN TANAH
1 Galian Tanah 0.65 x
2 Urugan Pasir Bawah Pondasi 0.60 x
3 Urugan Kembali + Pemadatan 12.87 :
4 Urugan Tanah Bawah Lantai 9.00 x
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak
2 MCB Listrik 1 Phase
3 Lampu SL 25 WATT
4 Stop Kontak
5 Saklar Tunggal
6 Saklar Ganda
1.00 Paket
1.00 Paket
2.35 6.70
2.35 6.70
13.40 m2
11.00 Titik
1.00 bh
6.00 bh
1.00 bh
2.00 bh
1.00 bh
245.85 m2
41.77 m2
31.36 6.27 m2
1.00 x 4.00 x 2.00 1.60 m2
0.50 x 4.00 x 2.00 3.40 m2
NO URAIAN PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu
2 Perlengkapan K3
Err:509 Err:509
B PEKERJAAN TANAH
1 Galian Tanah 0.65 x
2 Urugan Pasir Bawah Pondasi 0.60 x
3 Urugan Kembali + Pemadatan 4.89 :
4 Urugan Tanah Bawah Lantai 4.50 x
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak
2 MCB Listrik 1 Phase
3 Lampu SL 25 WATT
4 Saklar Tunggal
H PEKERJAAN SANITASI
1 Instalasi Air Kotor Pipa AW 2"
2 Instalasi Air Kotor Pipa AW 4"
3 Instalasi Air Bersih Pipa AW 3/4"
4 Pipa AW 2"
5 Pipa AW 4"
6 Pipa AW 3/4"
7 Septictank Biofil Kapasitas 6 - 8 Orang
8 Kran Air
9 Kloset Jongkok
10 Floor Drain
1.00 Paket
1.00 Paket
1.00 Err:509
9.00 Titik
1.00 bh
4.00 bh
4.00 bh
3.00 Titik
3.00 Titik
3.00 Titik
6.00 m'
6.00 m'
8.50 m'
1.00 bh
3.00 bh
3.00 bh
3.00 bh
41.40 m2
11.99 m2
0.20 2.50 m2
NO URAIAN PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu
2 Perlengkapan K3
0 0
B PEKERJAAN TANAH
1 Galian Tanah 0.65 x
2 Urugan Pasir Bawah Pondasi 0.60 x
3 Urugan Kembali + Pemadatan 7.51 :
4 Urugan Tanah Bawah Lantai 6.00 x
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak
2 MCB Listrik 1 Phase
3 Lampu SL 25 WATT
4 Stop Kontak
5 Saklar Tunggal
H PEKERJAAN SANITASI
1 Instalasi Air Kotor Pipa AW 4"
2 Instalasi Air Bekas Pipa AW 2"
3 Instalasi Air Bersih Pipa AW 3/4"
4 Pipa AW 4"
5 Pipa AW 2"
6 Pipa AW 3/4"
7 Septictank Biofil Kapasitas 6 - 8 Orang
8 Kran Air
9 Kloset Jongkok
10 Floor Drain
1.00 Paket
1.00 Paket
1.00 0
5.85 16.67
2.85 16.67
1.50 4.28
Total 37.62 m2
1.50 x 2.00 13.80 m2
1.35 x 2.00 13.80 m2
9.00 Titik
5.00 bh
1.00 bh
2.00 bh
1.00 bh
1.00 Titik
1.00 Titik
2.00 Titik
2.00 m'
3.00 m'
12.00 m'
1.00 bh
2.00 bh
1.00 bh
1.00 bh
85.36 m2
51.42 m2
15.39 3.08 m2
1.00 x 4.00 x 2.00 1.60 m2
0.50 x 4.00 x 2.00 3.40 m2
NO URAIAN PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu
2 Perlengkapan K3
0 0
B PEKERJAAN TANAH
1 Galian Tanah 0.65 x
2 Urugan Pasir Bawah Pondasi 0.60 x
3 Urugan Kembali + Pemadatan 5.01 :
4 Urugan Tanah Bawah Lantai 2.50 x
G PEKERJAAN ELECTRICAL
1 Pemasangan Titik Lampu + Stop Kontak
2 MCB Listrik 1 Phase
3 Lampu SL 25 WATT
4 Saklar Tunggal
1.00 Paket
1.00 Paket
1.00 0
1.00 bh
4.00 bh
3.00 Titik
1.00 bh
1.00 bh
1.00 bh
56.02 m2
14.92 m2
0.20 2.60 m2
NO URAIAN PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi, Papan Nama dan akses bantu
2 Perlengkapan K3
Err:509 Err:509
B PEKERJAAN TANAH
1 Galian Tanah 0.65 x
2 Urugan Pasir Bawah Pondasi 0.60 x
3 Urugan Kembali + Pemadatan 5.01 :
E PEKERJAAN SANITASI
1 Instalasi Pipa Air Bersih AW 3/4"
2 Pipa Air Bersih AW 3/4"
3 Pompa Air
4 Tutup Bak Kontrol Plat Besi
1.00 Paket
1.00 Paket
1.00 Err:509
2.00 Titik
10.00 m'
1.00 bh
1.00 bh
28.00 m2
A HARGA SATUAN PEKERJAAN TANAH
A.1 Penggalian 1 m3 tanah biasa sedalam 1 m
B BAHAN
C PERALATAN
B BAHAN
Pasir urug M3
C PERALATAN
B BAHAN
C PERALATAN
B BAHAN
Tanah Urug M3
C PERALATAN
B BAHAN
Batu belah M3
Semen Portland Kg
Pasir Pasang M3
C PERALATAN
B BAHAN
Batu belah M3
Pasir urug M3
C PERALATAN
B BAHAN
Semen Portland Kg
Pasir Beton m3
Batu Split, hasil pemecah batu (maks. 30mm) m3
C PERALATAN
B BAHAN
Besi beton (polos) Kg
Kawat beton Kg
C PERALATAN
B BAHAN
Kayu kelas III M3
Paku 5 cm – 10 cm Kg
Minyak bekisting Liter
C PERALATAN
B BAHAN
Kayu kelas III M3
Paku 5 cm – 12 cm Kg
Minyak bekisting Liter
Balok kayu kelas II M3
Plywood tebal 9 mm Lbr
Dolken kayu φ 8-10cm –panj 4 m batang
C PERALATAN
B BAHAN
Kayu kelas III M3
Paku 5 cm – 12 cm Kg
Minyak bekisting Liter
Balok kayu kelas II M3
Plywood tebal 9 mm Lbr
Dolken kayu φ 8-10cm –panj 4 m batang
C PERALATAN
B BAHAN
Kayu kelas III M3
Paku 5 cm – 12 cm Kg
Minyak bekisting Liter
Balok kayu kelas II M3
Plywood tebal 9 mm Lbr
Dolken kayu φ 8-10cm –panj 4 m batang
C PERALATAN
B BAHAN
Kayu kelas III M3
Paku 5 cm – 12 cm Kg
Minyak bekisting Liter
Balok kayu kelas II M3
Plywood tebal 9 mm Lbr
Dolken kayu φ 8-10cm –panj 4 m batang
C PERALATAN
B BAHAN
Kayu kelas III M3
Paku 5 cm – 12 cm Kg
Minyak bekisting Liter
Balok kayu kelas II M3
Plywood tebal 9 mm Lbr
Dolken kayu φ 8-10cm –panj 4 m batang
C PERALATAN
B BAHAN
Kayu kelas III M3
Paku 5 cm – 12 cm Kg
Minyak bekisting Liter
Balok kayu kelas II M3
Plywood tebal 9 mm Lbr
Dolken kayu φ 8-10cm –panj 4 m batang
C PERALATAN
B BAHAN
Batu Bata Buah
Semen Portland Kg
Pasir Pasang M3
C PERALATAN
D Jumlah Harga, Tenaga, Bahan dan Peralatan ( A+B+C)
E Overhead & Profit ( 15% x D )
F Harga Satuan Pekerjaan (D+E)
B BAHAN
Semen Portland Kg
Pasir Pasang M3
C PERALATAN
B BAHAN
Semen Portland Kg
C PERALATAN
B BAHAN
Keramik 40x40 BH
Semen Portland Kg
Pasir Pasang m3
Semen warna Kg
C PERALATAN
B BAHAN
Keramik Dinding 20x25 Bh
Semen Portland Kg
Pasir Pasang m3
Semen warna Kg
C PERALATAN
B BAHAN
Keramik 30x30 Bh
Semen Portland Kg
Pasir Pasang m3
Semen warna Kg
C PERALATAN
B BAHAN
C.75,0.8 m'
C.75,0.6 m'
Paku Sekrup bh
Dynabolt bh
Reng 30.45 m'
C PERALATAN
C PERALATAN
B BAHAN
Nok Metal m'
Screw Cteks 10x16-16 bh
C PERALATAN
B BAHAN
1 Hollow 4/4 Zincromate m'
2 Hollow 2/4 Zincromate m'
2 Paku Sekrup Kg
C PERALATAN
D Jumlah Harga, Tenaga, Bahan dan Peralatan ( A+B+C)
E Overhead & Profit ( 15% x D )
F Harga Satuan Pekerjaan (D+E)
B BAHAN
1 Kalsiboard 6mm Lbr
2 Paku Sekrup Kg
C PERALATAN
D Jumlah Harga, Tenaga, Bahan dan Peralatan ( A+B+C)
E Overhead & Profit ( 15% x D )
F Harga Satuan Pekerjaan (D+E)
B BAHAN
Lis Profil Gypsum m'
Tepung Gypsum Kg
C PERALATAN
B BAHAN
Cat Tembok kg
Plamir kg
Cat Dasar kg
C PERALATAN
B BAHAN
Cat Kilap kg
Minyak Cat ltr
Ampelas lbr
C PERALATAN
n 1SP : 4PP
111,566.62
16,734.99
128,301.61
1 Pekerja @Rp.
2 Mandor @Rp.
3 Tukang Batu @Rp.
4 Tukang Kayu @Rp.
5 Tukang Besi @Rp.
6 Tukang Keramik @Rp.
7 Tukang Plafond @Rp.
8 Tukang Pasang Pipa @Rp.
9 Tukang Cat @Rp.
10 Kepala Tukang @Rp.
11 Jaga Malam @Rp.
12 Instalasi Titik Api/Lampu Nyala @Rp.
13 Instalasi Air Bersih @Rp.
14 Instalasi Air Kotor/Limbah @Rp.
NO. URAIAN HARGA BAHAN HARGA
1 2 3
A TIMBUNAN / GALIAN
1 Tanah Timbun/Merah @Rp.
2 Pasir Timbun / Urug @Rp.
3 Pasir Pasang @Rp.
4 Pasir beton @Rp.
5 Sirtu @Rp.
B BAHAN PEREKAT
1 Portland Cement (PC) @Rp.
2 Tepung Gypsum @Rp.
3 Semen Warna @Rp.
E BESI / ALUMINIUM
1 Besi Beton polos @Rp.
2 Kawat Besi Beton @Rp.
3 Kawat Loket @Rp.
4 Paku Biasa @Rp.
5 Hollow 4/4 Zincromate @Rp.
6 Hollow 2/4 Zincromate @Rp.
7 Baja Ringan C.75 , 0.8 @Rp.
8 Baja Ringan C.75 , 0.6 @Rp.
9 Reng Baja Ringan @Rp.
10 Paku Sekrup @Rp.
11 Dynabolt @Rp.
12 Screw Cteks 10x16-16 @Rp.
13 Screw Cteks 12-4x50 @Rp.
13 Tutup Bak Kontrol Besi @Rp.
G PENUTUP ATAP
1 Atap Genteng Metal/Multi Roof 35 @Rp.
2 Nok Genteng Metal/Multi Roof (decra bond) @Rp.
I CAT / MINYAK
1 Cat dasar @Rp.
2 Cat Tembok setara Vinilex/Danadrite @Rp.
3 Cat Minyak untuk kayu @Rp.
4 Plamir @Rp.
5 Minyak Cat @Rp.
6 Minyak Bekisting @Rp.
7 Amplas No.8 @Rp.
J SANITASI / PIPA
1 Kloset duduk Toto @Rp.
2 Kloset Jongkok Toto @Rp.
3 Kran air Ø 1/2" - 3/4" @Rp.
4 Kran air leher angsa Ø 1/2" @Rp.
5 Floor drain Ø 4" steinless @Rp.
6 Stop kran Ø 3/4" @Rp.
7 Instalasi air bersih @Rp.
8 Instalasi air kotor/limbah @Rp.
9 Pipa PVC Tipe AW Ø 3/4" @Rp.
10 Pipa PVC Tipe AW Ø 2" @Rp.
11 Pipa PVC Tipe AW Ø 4" @Rp.
12 Septictank Biofil Kapasitas 6 - 8 Orang @Rp.
13 Bak cuci piring stainless @Rp.
14 Pompa Air Jet Pump @Rp.
K LISTRIK / ACSESORIES
1 MCB Listrik 8 Ampere @Rp.
2 Lampu XL 18 W + Fitting @Rp.
3 Lampu Downlight 9 W lengkap @Rp.
4 Stop Kontak @Rp.
5 Saklar tunggal @Rp.
6 Saklar ganda @Rp.
7 Instalasi Listrik titik api / Lampu nyala @Rp.
HAN
GARA
HARGA SATUAN
3 4
140,300.00 / Org/Hari
189,400.00 / OH
164,800.00 / OH
164,800.00 / OH
164,800.00 / OH
164,800.00 / OH
164,800.00 / OH
164,800.00 / OH
164,800.00 / OH
181,200.00 / OH
179,600.00 / OM
150,000.00 / Titik
100,000.00 / m'
100,000.00 / m'
HARGA SATUAN
3 4
181,280.00 / M3
272,800.00 / M3
342,870.00 / M3
386,760.00 / M3
82,830.00 / M3
2,651.00 / Kg
7,920.00 / Kg
2,567.00 / Kg
362,010.00 / M3
334,510.00 / M3
2,356.00 / Bh
35,000.00 / Bh
250,000.00 / m'
187,500.00 / m2
275,000.00 / Bh
150,000.00 / m'
2,708,670.00 / M3
3,506,770.00 / M3
25,000.00 / Btg
13,000.00 / M'
289,000.00 / Lbr
217,360.00 / Lbr
350,000.00 / bh
550,000.00 / m'
2,500,000.00 / m'
350,000.00 / bh
15,677.20 / Kg
24,411.00 / Kg
250,000.00 / M2
31,350.00 / Kg
53,768.00 / Btg
41,013.00 / Btg
18,170.00 / m'
14,375.00 / m'
10,235.00 / m'
75,678.00 / kg
828.00 / bh
862.00 / bh
1,380.00 / bh
1,500,000.00 / bh
4,806.00 / Bh
10,564.00 / Bh
18,675.00 / Bh
187,330.00 / M2
45,254.00 / Bh
34,210.00 / Kg
59,070.00 / Kg
130,130.00 / Kg
71,060.00 / Kg
47,300.00 / Kg
11,880.00 / Kg
7,500.00 / Lbr
4,323,000.00 / Bh
739,090.00 / Bh
73,700.00 / Bh
253,000.00 / Bh
90,750.00 / Bh
173,470.00 / Bh
143,000.00 / Ttk
178,750.00 / Ttk
10,639.20 / Btg
33,161.70 / Btg
71,814.60 / Btg
5,000,000.00 / Bh
450,000.00 / Bh
1,758,000.00 Bh
50,000.00 / bh
94,050.00 / bh
47,500.00 / bh
22,330.00 / Bh
25,740.00 / Bh
32,400.00 / Bh
176,000.00 / Ttk