Luas Kebutuhan Harga Satuan Kebutuhan Jumlah


No Rincian Jumlah Satuan
Ha Per Ha Satuan Rp Per Ha Rp
1 2 3 4 5 6 7 8
I BAHAN
1 Pengadaan bibit tebu 10 80 Kw 800 Kw 65,000 5,200,000   52,000,000
2 Pengadaan saprodi :
a. Pupuk ZA 10 7 Kw 70 Kw 1,400 9,800   98,000
b. Pupuk SP-36 10 2 Kw 20 Kw 2,000 4,000   40,000
c. NPK 10 2 Kw 20 Kw 2,300 4,600   46,000
d. Pupuk Organik 10 4,000 kg 40,000 Kw 500 2,000,000   20,000,000
e. Herbisida 10 6 kg 60 Kw 110,000 660,000   6,600,000
TOTAL I 7,878,400   78,784,000
II TENAGA KERJA
1 Persiapan Lahan 10 20 Hok 200 Kw 25,000 500,000   5,000,000
2 Pengolahan Tanah 10 145 Hok 1,450 Kw 25,000 3,625,000   36,250,000

sampai siap tanam


3 Persiapan Tanam 10 20 Hok 200 Kw 25,000 500,000   5,000,000
4 Tanam 10 30 Hok 300 Kw 25,000 750,000   7,500,000
5 Pemeliharaan Tanaman 10 30 Hok 300 Kw 25,000 750,000   7,500,000
6 Pemupukan 10 40 Hok 400 Kw 25,000 1,000,000   10,000,000
7 Bumbun I+II 10 60 Hok 600 Kw 25,000 1,500,000   15,000,000
8 Kletek I+II 10 60 Hok 600 Kw 25,000 1,500,000   15,000,000
10 Papan Nama 10 1 Ha 10 Kw 50,000 50,000   500,000
TOTAL II 10,175,000   101,750,000
TOTAL I + II (biaya budi daya) 18,053,400   180,534,000
III Sewa Lahan 10 1 Ha 10 Kw 1,500,000 1,500,000   15,000,000
Tebang angkut 10 700 Kw 7,000 Kw 7,000 4,900,000   49,000,000
TOTAL III 6,400,000   64,000,000
GRAND TOTAL (I+II+III) 24,453,400    244,534,000 

http://slide pdf.c om/re a de r/full/ra b-te bu 1/3


 

5/16/2018 ra b te bu - slide pdf.c om

PLANT CANE (PC) RATOON CANE


NO KOMPONEN BIAYA Vol/HOK Harga Satuan Jumlah Biaya Vol/HOK Harga Satuan
 A SEWA LAHAN 1 Tahun 15000000 15000000 1 Tahun 15000000
1
B BIAYA GARAP
1 Persiapan Lahan ( Traktor ) 1 unit 1650000 1650000 0 unit 0
2 Pembuatan Got 1200 m 150 180000 0m 0
3 Penanaman/perawatan 1200 leng 800 960000 1200 leng 800
4 Pemupukan I 1200 leng 125 150000 1200 leng 200
5 Pemupukan II 1200 leng 125 150000 1200 leng 200
6 Bumbun I 1200 leng 375 450000 1200 leng 400
7 Bumbun II 1200 leng 375 450000 1200 leng 400
8 Tangkep I 1200 leng 500 600000 1200 leng 500
9 Tangkep II 1200 leng 500 600000 1200 leng 500
10 Klethek I 1200 leng 300 360000 1200 leng 400

11 Klethek II 1200 leng 300 360000 1200 leng 400


12 Pemeliharaan Got 1200 m 200 240000 1200 m 200
13 Tebang Angkut 700 kwintal 7000 4900000 700 kwintal 7000
Total B 11050000  
C BAHAN
1 Bibit 70 kwintal 40000 2800000 0 kwintal 0
2 Pupuk
Ponska 5 kwintal 230000 1150000 5 kwintal 230000
Za 5 kwintal 140000 700000 5 kwintal 140000
Total C  4650000
Grand Total (A+B+C) 30700000

http://slide pdf.c om/re a de r/full/ra b-te bu 2/3


 

5/16/2018 ra b te bu - slide pdf.c om

Jumlah Biaya
15000000

0
0
960000
240000
240000
480000
480000
600000
600000
480000

480000
240000
4900000
9700000 

1150000
700000
1850000
26550000