Anda di halaman 1dari 10

TOTAL

No Nama Pekerja HK Lembur Upah/HK Lembur/Jam Total Upah HK


1 Mang Ojo 14 18 140,000 14,000 1,960,000
2 Pa Sri 13 5 140,000 14,000 1,820,000
3 Pa Udin 13 2 140,000 14,000 1,820,000
4 Pa Yant 12.5 2 140,000 14,000 1,750,000
5 Pa Rama 13 17 140,000 14,000 1,820,000
6 Pa Arman 12 18 140,000 14,000 1,680,000
7 Pa Rindu 13 17 140,000 14,000 1,820,000
8 Pa Oman 13 18 140,000 14,000 1,820,000
9 Pa Aang 14 2 140,000 14,000 1,960,000
10 Asep Gendut 9.5 4 140,000 14,000 1,330,000
11 Asep Kecil 10.5 3 140,000 14,000 1,470,000
12 Riki 14 11 140,000 14,000 1,960,000
13 Didi 13 20 140,000 14,000 1,820,000
14 Fajar 11 5 140,000 14,000 1,540,000
15 Rawing 12 18 140,000 14,000 1,680,000
16 Wawan 12 3 140,000 14,000 1,680,000
17 Nursidiq 12 10 140,000 14,000 1,680,000
18 Pa Dian 0 0 140,000 14,000 -
19 Dian 0 0 140,000 14,000 -
20 Pa Delon 0 0 140,000 14,000 -
Total Upah lembur Total Uang
252,000 2,212,000 - 2,212,000
70,000 1,890,000 - 1,890,000
28,000 1,848,000 - 1,848,000
28,000 1,778,000 - 1,778,000
238,000 2,058,000 - 2,058,000
252,000 1,932,000 - 1,932,000
238,000 2,058,000 - 2,058,000
252,000 2,072,000 - 2,072,000
28,000 1,988,000 - 1,988,000
56,000 1,386,000 - 1,386,000
42,000 1,512,000 - 1,512,000
154,000 2,114,000 - 2,114,000
280,000 2,100,000 - 2,100,000
70,000 1,610,000 - 1,610,000
252,000 1,932,000 - 1,932,000
42,000 1,722,000 - 1,722,000
140,000 1,820,000 - 1,820,000
- - - -
- - - -
- - - -
32,032,000
Mandor
-
SLIP PENERIMAAN UPAH KERJA SLIP PENERIMAAN UPAH KERJA SLIP PENERIMAAN UPAH KERJA
PROYEK PEMBUATAN PONDASI TRANSMISI PROYEK PEMBUATAN PONDASI TRANSMISI PROYEK PEMBUATAN PONDASI TRANSMISI
T/L 150 KV MUARA LABUH - SUNGAI RUMBAI T/L 150 KV MUARA LABUH - SUNGAI RUMBAI T/L 150 KV MUARA LABUH - SUNGAI RUMBAI

BULAN AGUSTUS 2018 BULAN AGUSTUS 2018 BULAN AGUSTUS 2018

NAMA Mang Ojo NAMA Pa Sri NAMA Pa Udin

JUMLAH HK : 14 JUMLAH HK : 13 JUMLAH HK : 13


UPAH/HK : Rp 140,000 UPAH/HK : Rp 140,000 UPAH/HK : Rp 140,000
JUMLAH LEMBUR : 18 JUMLAH LEMBUR : 5 JUMLAH LEMBUR : 2
UPAH LEMBUR/JAM : Rp 14,000 UPAH LEMBUR/JAM : Rp 14,000 UPAH LEMBUR/JAM : Rp 14,000
JUMLAH UANG : Rp 2,212,000 JUMLAH UANG : Rp 1,890,000 JUMLAH UANG : Rp 1,848,000
POTONGAN : Rp - POTONGAN : Rp - POTONGAN : Rp -
TERIMA : Rp 2,212,000 TERIMA : Rp 1,890,000 TERIMA : Rp 1,848,000

0 0 0
Mandor Mandor Mandor

0 0 0

SLIP PENERIMAAN UPAH KERJA SLIP PENERIMAAN UPAH KERJA SLIP PENERIMAAN UPAH KERJA
PROYEK PEMBUATAN PONDASI TRANSMISI PROYEK PEMBUATAN PONDASI TRANSMISI PROYEK PEMBUATAN PONDASI TRANSMISI
T/L 150 KV MUARA LABUH - SUNGAI RUMBAI T/L 150 KV MUARA LABUH - SUNGAI RUMBAI T/L 150 KV MUARA LABUH - SUNGAI RUMBAI

BULAN AGUSTUS 2018 BULAN AGUSTUS 2018 BULAN AGUSTUS 2018

NAMA Pa Yant NAMA Pa Rama NAMA Pa Arman

JUMLAH HK : 13 JUMLAH HK : 12 JUMLAH HK : 12


UPAH/HK : Rp 140,000 UPAH/HK : Rp 140,000 UPAH/HK : Rp 140,000
JUMLAH LEMBUR : 2 JUMLAH LEMBUR : 18 JUMLAH LEMBUR : 17
UPAH LEMBUR/JAM : Rp 14,000 UPAH LEMBUR/JAM : Rp 14,000 UPAH LEMBUR/JAM : Rp 14,000
JUMLAH UANG : Rp 1,778,000 JUMLAH UANG : Rp 1,932,000 JUMLAH UANG : Rp 1,932,000
POTONGAN : Rp - POTONGAN : Rp - POTONGAN : Rp -
TERIMA : Rp 1,778,000 TERIMA : Rp 1,932,000 TERIMA : Rp 1,932,000

0 0 0
Mandor Mandor Mandor

0 0 0

SLIP PENERIMAAN UPAH KERJA SLIP PENERIMAAN UPAH KERJA SLIP PENERIMAAN UPAH KERJA
PROYEK PEMBUATAN PONDASI TRANSMISI PROYEK PEMBUATAN PONDASI TRANSMISI PROYEK PEMBUATAN PONDASI TRANSMISI
T/L 150 KV MUARA LABUH - SUNGAI RUMBAI T/L 150 KV MUARA LABUH - SUNGAI RUMBAI T/L 150 KV MUARA LABUH - SUNGAI RUMBAI

BULAN AGUSTUS 2018 BULAN AGUSTUS 2018 BULAN AGUSTUS 2018

NAMA Pa Rindu NAMA Pa Oman NAMA Pa Aang

JUMLAH HK : 13 JUMLAH HK : 13 JUMLAH HK : 14


UPAH/HK : Rp 140,000 UPAH/HK : Rp 140,000 UPAH/HK : Rp 140,000
JUMLAH LEMBUR : 17 JUMLAH LEMBUR : 18 JUMLAH LEMBUR : 2
UPAH LEMBUR/JAM : Rp 14,000 UPAH LEMBUR/JAM : Rp 14,000 UPAH LEMBUR/JAM : Rp 14,000
JUMLAH UANG : Rp 2,058,000 JUMLAH UANG : Rp 2,072,000 JUMLAH UANG : Rp 1,988,000
POTONGAN : Rp - POTONGAN : Rp - POTONGAN : Rp -
TERIMA : Rp 2,058,000 TERIMA : Rp 2,072,000 TERIMA : Rp 1,988,000

0 0 0
Mandor Mandor Mandor

0 0 0

SLIP PENERIMAAN UPAH KERJA SLIP PENERIMAAN UPAH KERJA SLIP PENERIMAAN UPAH KERJA
PROYEK PEMBUATAN PONDASI TRANSMISI PROYEK PEMBUATAN PONDASI TRANSMISI PROYEK PEMBUATAN PONDASI TRANSMISI
T/L 150 KV MUARA LABUH - SUNGAI RUMBAI T/L 150 KV MUARA LABUH - SUNGAI RUMBAI T/L 150 KV MUARA LABUH - SUNGAI RUMBAI

BULAN AGUSTUS 2018 BULAN AGUSTUS 2018 BULAN AGUSTUS 2018

NAMA Asep Gendut NAMA Asep Kecil NAMA Riki

JUMLAH HK : 10 JUMLAH HK : 14 JUMLAH HK : 14


UPAH/HK : Rp 140,000 UPAH/HK : Rp 140,000 UPAH/HK : Rp 140,000
JUMLAH LEMBUR : 4 JUMLAH LEMBUR : 11 JUMLAH LEMBUR : 20
UPAH LEMBUR/JAM : Rp 14,000 UPAH LEMBUR/JAM : Rp 14,000 UPAH LEMBUR/JAM : Rp 14,000
JUMLAH UANG : Rp 1,386,000 JUMLAH UANG : Rp 2,114,000 JUMLAH UANG : Rp 2,114,000
POTONGAN : Rp - POTONGAN : Rp - POTONGAN : Rp -
TERIMA : Rp 1,386,000 TERIMA : Rp 2,114,000 TERIMA : Rp 2,114,000

0 0 0
Mandor Mandor Mandor

0 0 0

SLIP PENERIMAAN UPAH KERJA SLIP PENERIMAAN UPAH KERJA SLIP PENERIMAAN UPAH KERJA
PROYEK PEMBUATAN PONDASI TRANSMISI PROYEK PEMBUATAN PONDASI TRANSMISI PROYEK PEMBUATAN PONDASI TRANSMISI
T/L 150 KV MUARA LABUH - SUNGAI RUMBAI T/L 150 KV MUARA LABUH - SUNGAI RUMBAI T/L 150 KV MUARA LABUH - SUNGAI RUMBAI

BULAN AGUSTUS 2018 BULAN AGUSTUS 2018 BULAN AGUSTUS 2018

NAMA Didi NAMA Fajar NAMA Rawing

JUMLAH HK : 13 JUMLAH HK : 11 JUMLAH HK : 12


UPAH/HK : Rp 140,000 UPAH/HK : Rp 140,000 UPAH/HK : Rp 140,000
JUMLAH LEMBUR : 20 JUMLAH LEMBUR : 5 JUMLAH LEMBUR : 18
UPAH LEMBUR/JAM : Rp 14,000 UPAH LEMBUR/JAM : Rp 14,000 UPAH LEMBUR/JAM : Rp 14,000
JUMLAH UANG : Rp 2,100,000 JUMLAH UANG : Rp 1,610,000 JUMLAH UANG : Rp 1,932,000
POTONGAN : Rp - POTONGAN : Rp - POTONGAN : Rp -
TERIMA : Rp 2,100,000 TERIMA : Rp 1,610,000 TERIMA : Rp 1,932,000

0 0 0
Mandor Mandor Mandor

0 0 0
SLIP PENERIMAAN UPAH KERJA SLIP PENERIMAAN UPAH KERJA SLIP PENERIMAAN UPAH KERJA
PROYEK PEMBUATAN PONDASI TRANSMISI PROYEK PEMBUATAN PONDASI TRANSMISI PROYEK PEMBUATAN PONDASI TRANSMISI
T/L 150 KV MUARA LABUH - SUNGAI RUMBAI T/L 150 KV MUARA LABUH - SUNGAI RUMBAI T/L 150 KV MUARA LABUH - SUNGAI RUMBAI

BULAN AGUSTUS 2018 BULAN AGUSTUS 2018 BULAN AGUSTUS 2018

NAMA Wawan NAMA Nursidiq NAMA Pa Dian

JUMLAH HK : 12 JUMLAH HK : 12 JUMLAH HK : -


UPAH/HK : Rp 140,000 UPAH/HK : Rp 140,000 UPAH/HK : Rp 140,000
JUMLAH LEMBUR : 3 JUMLAH LEMBUR : 10 JUMLAH LEMBUR : -
UPAH LEMBUR/JAM : Rp 14,000 UPAH LEMBUR/JAM : Rp 14,000 UPAH LEMBUR/JAM : Rp 14,000
JUMLAH UANG : Rp 1,722,000 JUMLAH UANG : Rp 1,820,000 JUMLAH UANG : Rp -
POTONGAN : Rp - POTONGAN : Rp - POTONGAN : Rp -
TERIMA : Rp 1,722,000 TERIMA : Rp 1,820,000 TERIMA : Rp -

0 0 0
Mandor Mandor Mandor

0 0 0

SLIP PENERIMAAN UPAH KERJA SLIP PENERIMAAN UPAH KERJA


PROYEK PEMBUATAN PONDASI TRANSMISI PROYEK PEMBUATAN PONDASI TRANSMISI
T/L 150 KV MUARA LABUH - SUNGAI RUMBAI T/L 150 KV MUARA LABUH - SUNGAI RUMBAI

BULAN AGUSTUS 2018 BULAN AGUSTUS 2018

NAMA Dian NAMA Pa Delon

JUMLAH HK : - JUMLAH HK : -
UPAH/HK : Rp 140,000 UPAH/HK : Rp 140,000
JUMLAH LEMBUR : - JUMLAH LEMBUR : -
UPAH LEMBUR/JAM : Rp 14,000 UPAH LEMBUR/JAM : Rp 14,000
JUMLAH UANG : Rp - JUMLAH UANG : Rp -
POTONGAN : Rp - POTONGAN : Rp -
TERIMA : Rp - TERIMA : Rp -

0 0
Mandor Mandor

0 0
Persekot Transfer 30-Jun-18 7-Jul-18 9-Jul-18 14-Jul-18 16-Jul-18
Mang Ojo 500,000 - 300,000 50,000 250,000 50,000 250,000
Pa Sri 500,000 1,000,000 300,000 50,000 250,000 50,000 250,000
Pa Udin 500,000 1,000,000 300,000 50,000 250,000 50,000 250,000
Pa Yant 500,000 1,000,000 300,000 50,000 250,000 50,000 250,000
Pa Rama 500,000 1,000,000 300,000 50,000 250,000 50,000 250,000
Pa Arman 500,000 1,000,000 300,000 50,000 250,000 50,000 250,000
Pa Rindu 500,000 1,000,000 300,000 50,000 250,000 50,000 250,000
Pa Oman 500,000 1,000,000 300,000 50,000 250,000 50,000 250,000
Pa Aang 500,000 1,000,000 300,000 50,000 250,000 50,000 250,000
Asep Gendut 500,000 1,000,000 300,000 50,000 250,000 50,000 300,000
Asep Kecil 500,000 1,000,000 300,000 50,000 250,000 50,000 250,000
Riki 500,000 1,000,000 300,000 50,000 250,000 50,000 250,000
Didi 500,000 1,000,000 300,000 50,000 250,000 50,000 250,000
Fajar 500,000 1,000,000 300,000 50,000 250,000 50,000 250,000
Rawing 500,000 - 300,000 50,000 250,000 50,000 250,000
Wawan 500,000 1,000,000 300,000 50,000 250,000 50,000 250,000
Nursidiq 500,000 1,000,000 300,000 50,000 250,000 50,000 250,000
Pa Dian 500,000 - 300,000 50,000 250,000 50,000 250,000
Dian 500,000 - 300,000 50,000 250,000 50,000 250,000
Pa Delon 500,000 - 300,000 50,000 250,000 50,000 250,000
21-Jul-18 27-Jul-18 3-Aug-18 7-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18
200,000 350,000 300,000 50,000 2,000,000 - 30,000
200,000 350,000 300,000 50,000 1,000,000 15,000 30,000
200,000 350,000 300,000 50,000 1,000,000 15,000 30,000
200,000 350,000 300,000 50,000 1,000,000 - 30,000
200,000 350,000 300,000 50,000 1,000,000 15,000 30,000
200,000 350,000 300,000 50,000 1,000,000 15,000 30,000
200,000 350,000 300,000 50,000 1,000,000 15,000 30,000
200,000 350,000 300,000 50,000 1,000,000 15,000 30,000
200,000 350,000 300,000 50,000 1,000,000 15,000 30,000
250,000 350,000 328,000 50,000 1,000,000 - 30,000
200,000 350,000 300,000 50,000 1,000,000 - 30,000
200,000 350,000 300,000 50,000 1,000,000 - 30,000
200,000 350,000 300,000 50,000 1,000,000 15,000 30,000
200,000 350,000 300,000 50,000 1,000,000 15,000 30,000
200,000 350,000 300,000 50,000 2,000,000 15,000 30,000
225,000 416,500 316,000 50,000 1,000,000 15,000 30,000
200,000 370,000 316,000 50,000 1,000,000 15,000 30,000
200,000 1,100,000 - - 398,000 - -
200,000 1,100,000 - - 50,000 - -
200,000 1,100,000 - - - -
14-Aug-18 15-Aug-18 16-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 Jumlah
30,000 30,000 35,000 30,000 30,000 10,000 - 4,495,000
30,000 30,000 35,000 30,000 30,000 10,000 - 4,510,000
30,000 30,000 35,000 30,000 30,000 10,000 - 4,510,000
30,000 30,000 35,000 30,000 30,000 10,000 - 4,495,000
30,000 30,000 35,000 30,000 30,000 10,000 - 4,510,000
30,000 30,000 35,000 30,000 30,000 10,000 - 4,510,000
30,000 30,000 35,000 30,000 30,000 10,000 - 4,510,000
30,000 30,000 35,000 30,000 30,000 10,000 - 4,510,000
30,000 30,000 35,000 30,000 30,000 10,000 - 4,510,000
30,000 60,000 35,000 50,000 30,000 10,000 - 4,673,000
30,000 30,000 35,000 30,000 30,000 10,000 - 4,495,000
30,000 30,000 35,000 30,000 30,000 10,000 - 4,495,000
30,000 30,000 35,000 30,000 30,000 10,000 - 4,510,000
30,000 30,000 35,000 30,000 30,000 10,000 - 4,510,000
30,000 30,000 35,000 30,000 30,000 10,000 - 4,510,000
30,000 30,000 35,000 30,000 30,000 10,000 - 4,617,500
30,000 30,000 35,000 30,000 30,000 10,000 - 4,546,000
- - - - - - - 3,098,000
- - - - - - - 2,750,000
- - - - - - - 2,700,000
2,267,000 1,150,000 500,000 50,000 1,700,000 Mang Ojo 567,000
2,120,000 1,150,000 500,000 50,000 1,700,000 Pa Sri 420,000
1,748,000 1,150,000 500,000 50,000 1,700,000 Pa Udin 48,000
1,833,000 1,150,000 500,000 50,000 1,700,000 Pa Yant 133,000
2,098,000 1,150,000 500,000 50,000 1,700,000 Pa Rama 398,000
1,972,000 1,150,000 500,000 50,000 1,700,000 Pa Arman 272,000
1,790,000 1,150,000 500,000 50,000 1,700,000 Pa Rindu 90,000
2,084,000 1,150,000 500,000 50,000 1,700,000 Pa Oman 384,000
1,888,000 1,150,000 500,000 50,000 1,700,000 Pa Aang 188,000
955,000 1,150,000 500,000 50,000 1,700,000 Asep Gendut (745,000)
1,539,000 1,150,000 500,000 50,000 1,700,000 Asep Kecil (161,000)
2,281,000 1,150,000 500,000 50,000 1,700,000 Riki 581,000
2,280,000 1,150,000 500,000 50,000 1,700,000 Didi 580,000
1,622,000 1,150,000 500,000 50,000 1,700,000 Fajar (78,000)
1,944,000 1,150,000 500,000 50,000 1,700,000 Rawing 244,000
1,206,000 1,150,000 500,000 50,000 1,700,000 Wawan (494,000)
1,684,000 1,150,000 500,000 50,000 1,700,000 Nursidiq (16,000)
724,000 - 500,000 50,000 550,000 Kastoni 174,000
1,072,000 - 500,000 50,000 550,000 Dian 522,000
877,000 - 500,000 50,000 550,000 Pa Delon 327,000
33,984,000 19,550,000 10,000,000 1,000,000 30,550,000 3,434,000
2,404,000