Anda di halaman 1dari 1

C/L OF LOOP LINE

C/L OF MAIN LINE BOUNDARY WALL

BOUNDARY
WALL
1676 MM

150 MM THK. WBM


BOULDER FILLING & MOORUM 450 MM THK. DRAIN
EXST. RAIL LEVEL 163.669 PROP. RAIL EVEL & PLATFORM TOP LEVEL 163.712

BANK
HEIGHT
2623 MM

GROUND LEVEL 161.089


GOOD SOIL / ASH

RETURN
WALL

CROSS SECTION AT CH.8700 M

CL OF BR.NO:20 (1 X0.30m RCC SLAB )


L-XING. NO.8 AT CH:8058.989m F/CSB

SRJ AT CH:8102.836m F/CSB


TP2 AT CH:8097.691m F/CSB

SRJ AT CH:8153.940m F/CSB

FM AT CH:8204.573m F/CSB

AT CH: 8697.586 m

PU
CC
A
100 X 50 ISMB

RO
WITH G.I.

AD
SEATING
PUCCA ROAD
PUCCA ROAD

HUT
Km: 8.2 Km: 8.5 Km: 8.6 Km: 8.7 Km: 8.8
1 in 8.5 (CS) 1 in 8.5 (CS) 1 in 8.5 (CS)
SLOPE

SLOPE

SLOPE
Km: 8.1 PROP. COAL UNLOADING RAIL LEVEL PLATFORM 650 X 14.5 M LONG
SLOPE SLOPE
0
K m: 8.

0.650 DEPTH 0.750 WIDTH ( DRAIN ) 0.650 DEPTH 0.750 WIDTH( DRAIN ) 0.650 DEPTH 0.750 WIDTH ( DRAIN )
PLATFORM STARTS

HINDALCO PLANT BOUNDARY

AT CH:8861.000m
AT CH:8211.000m

OUT LET C.M.B

PLATFORM END
PLAN
SCALE : 1 : 2000
L-XING. NO.8 AT CH:8058.989m F/CSB

CL OF BR.NO:1 (1 X0.3048m HP )
SRJ AT CH:8153.940m F/CSB

FM AT CH:8204.573m F/CSB
SRJ AT CH:8102.836m F/CSB
TP2 AT CH:8097.691m F/CSB

PLATFORM STARTS
AT CH:8225.000m

AT CH: 8697.586 m

AT CH:8875.000m
PLATFORM END
EXISTING RAIL LEVEL
EXISTING FORMATION LEVEL
GROUND LEVEL

69, G.K.V BRAMESHWAR PATNA, TANKAPANI ROAD


RICPL BHUBANESWAR .

DRG. NO : RICPL/HIL/P&L-S/DRG/04 Sheet- 4 of 4

Anda mungkin juga menyukai