VENDOR's DRAWING / DOCUMENT SUBMISSION SCHEDULE / MONITORING SHEET

1. Project Name
FARABI NORMAL PARAFFIN AND DERIVATIVES Issue No:

2. Client' Name & Country of Origin


FARABI YANBU PETROCHEMICALS COMPANY Date :

3. E&P Contractor / Detail Engg.


Center L&T HYDROCARBON ENGINEERING / L&T CHIYODA LIMITED

4. Equipment / Service / Item No.


HVAC

6. Vendor's Name, Country of


Origin
Zamil Projects, KSA

7. Vendor Package Name

ACCEPTANCE CODE NUMBERS : Code 1 = Rejected: Revise and Resubmit, Code 2 = Comment As Noted, Code 3 = No Comment, Code 4 = Information Only

To be Issued by Vendor
Sl. No. Drawing / Document Title CLIENT DOCUMENT NUMBER VENDOR DOCUMENT NUMBER Category Document Nature Discipline Code Doc Type Doc Size Project Unit
dd/mmm/yy

HEAT LOAD CALCULATIONS

HVAC EQUIPMENT SIZING CALCULATION - ADMINISTRATION BUILDING G446-000-CA-0101-0001-01 R Engineering MEP CA A4 000

HVAC EQUIPMENT SIZING CALCULATION - CANTEEN BUILDING G446-000-CA-0101-0002-01 R Engineering MEP CA A4 000

HVAC EQUIPMENT SIZING CALCULATION - MAIN CONTROL BUILDING G446-000-CA-0101-0003-01 R Engineering MEP CA A4 000

HVAC EQUIPMENT SIZING CALCULATION - TECHNICAL BUILDING G446-000-CA-0101-0004-01 R Engineering MEP CA A4 000

HVAC EQUIPMENT SIZING CALCULATION - MAIN LABORATORY BUILDING G446-000-CA-0101-0005-01 R Engineering MEP CA A4 000

HVAC EQUIPMENT SIZING CALCULATION - SUBSTATION BUILDING ( SS 01) G446-000-CA-0101-0006-01 R Engineering MEP CA A4 000

ESP CALCULATION - ADMINISTRATION BUILDING G446-000-CA-0101-0007-01 R Engineering MEP CA A4 000

ESP CALCULATION - CANTEEN BUILDING G446-000-CA-0101-0008-01 R Engineering MEP CA A4 000

ESP CALCULATION - MAIN CONTROL BUILDING G446-000-CA-0101-0009-01 R Engineering MEP CA A4 000

ESP CALCULATION - TECHNICAL BUILDING G446-000-CA-0101-0010-01 R Engineering MEP CA A4 000

ESP CALCULATION - MAIN LABORATORY BUILDING G446-000-CA-0101-0011-01 R Engineering MEP CA A4 000

ESP CALCULATION - SUBSTATION BUILDING ( SS 01) G446-000-CA-0101-0012-01 R Engineering MEP CA A4 000

HVAC DRAWINGS

SYMBOLS AND ABBREVIATIONS - ALL BLDGS. G446-000-DW-0101-0001-01 R Engineering MEP DW A0 000

HVAC TYPICAL DETAILS - MECHANICAL - ALL BLDGS. G446-000-DW-0101-0002-01 R Engineering MEP DW A0 000

HVAC LAYOUT/PLAN/SECTIONS - ADMINISTRATION BUILDING G446-000-DW-0101-0003-01 R Engineering MEP DW A0 000

HVAC AIRFLOW DIAGRAM - ADMINISTRATION BUILDING G446-000-DW-0101-0004-01 R Engineering MEP DW A0 000

EQUIPMENT SCHEDULE - ADMINISTRATION BUILDING G446-000-DW-0101-0005-01 R Engineering MEP DW A0 000

MECHANIICAL BUILDERS WORK LAYOUT-ADMINISTRATION BUILDING G446-000-DW-0101-0006-01 R Engineering MEP DW A0 000

HVAC LAYOUT/PLAN/SECTIONS - CANTEEN BUILDING G446-000-DW-0101-0007-01 R Engineering MEP DW A0 000

HVAC AIRFLOW DIAGRAM - CANTEEN BUILDING G446-000-DW-0101-0008-01 R Engineering MEP DW A0 000

EQUIPMENT SCHEDULE - CANTEEN BUILDING G446-000-DW-0101-0009-01 R Engineering MEP DW A0 000

MECHANICAL BUILDERS WORK LAYOUT- CANTEEN BUILDING G446-000-DW-0101-0010-01 R Engineering MEP DW A0 000

HVAC LAYOUT/PLAN/SECTIONS - MAIN CONTROL BUILDING G446-000-DW-0101-0011-01 R Engineering MEP DW A0 000

HVAC AIRFLOW DIAGRAM - MAIN CONTROL BUILDING G446-000-DW-0101-0012-01 R Engineering MEP DW A0 000

EQUIPMENT SCHEDULE - MAIN CONTROL BUILDING G446-000-DW-0101-0013-01 R Engineering MEP DW A0 000

MECHANICAL BUILDERS WORK LAYOUT- MAIN CONTROL BUILDING G446-000-DW-0101-0014-01 R Engineering MEP DW A0 000

HVAC LAYOUT/PLAN/SECTIONS - TECHNICAL BUILDING G446-000-DW-0101-0015-01 R Engineering MEP DW A0 000

HVAC AIRFLOW DIAGRAM - TECHNICAL BUILDING G446-000-DW-0101-0016-01 R Engineering MEP DW A0 000

EQUIPMENT SCHEDULE - TECHNICAL BUILDING G446-000-DW-0101-0017-01 R Engineering MEP DW A0 000

MECHANICAL BUILDERS WORK LAYOUT- TECHNICAL BUILDING G446-000-DW-0101-0018-01 R Engineering MEP DW A0 000

HVAC LAYOUT/PLAN/SECTIONS - MAIN LABORATORY BUILDING G446-000-DW-0101-0019-01 R Engineering MEP DW A0 000

HVAC AIRFLOW DIAGRAM - MAIN LABORATORY BUILDING G446-000-DW-0101-0020-01 R Engineering MEP DW A0 000

EQUIPMENT SCHEDULE - MAIN LABORATORY BUILDING G446-000-DW-0101-0021-01 R Engineering MEP DW A0 000

MECHANICAL BUILDERS WORK LAYOUT- MAIN LABORATORY BUILDING G446-000-DW-0101-0022-01 R Engineering MEP DW A0 000

HVAC LAYOUT/PLAN/SECTIONS - SUBSTATION BUILDING ( SS 01) G446-000-DW-0101-0023-01 R Engineering MEP DW A0 000

HVAC AIRFLOW DIAGRAM - SUBSTATION BUILDING ( SS 01) G446-000-DW-0101-0024-01 R Engineering MEP DW A0 000

EQUIPMENT SCHEDULE - SUBSTATION BUILDING ( SS 01) G446-000-DW-0101-0025-01 R Engineering MEP DW A0 000

MECHANICAL BUILDERS WORK LAYOUT- SUBSTATION BUILDING ( SS 01) G446-000-DW-0101-0026-01 R Engineering MEP DW A0 000

MATERIAL SUBMITTAL

PACKAGE UNIT TECHNICAL SUBMITTAL - ALL BLDGS. G446-000-MR-0101-0001-01 R Engineering MEP MR A4 000

AIR HANDLING UNIT TECHNICAL SUBMITTAL - ALL BLDGS. G446-000-MR-0101-0002-01 R Engineering MEP MR A4 000

AIR COOLED CONDENSING UNIT TECHNICAL SUBMITTAL - ALL BLDGS. G446-000-MR-0101-0003-01 R Engineering MEP MR A4 000

BULK MATERIAL SUBMITTAL - MECHANICAL - ALL BLDGS. G446-000-MR-0101-0004-01 R Engineering MEP MR A4 000

FAN TECHNICAL DETAILS SUBMITTAL G446-000-MR-0101-0005-01 R Engineering MEP MR A4 000

SOUND ATTENUATOR TECHNICAL DETAILS SUBMITTAL G446-000-MR-0101-0006-01 R Engineering MEP MR A4 000

ELECTRIC DUCT HEATER TECHNICAL DETAILS SUBMITTAL G446-000-MR-0101-0007-01 R Engineering MEP MR A4 000

HVAC CONTROL DRAWINGS

HVAC CONTROL LAYOUT - ADMINISTRATION BUILDING G446-000-DW-0101-0030-01 R Engineering MEP DW A0 000

HVAC CONTROL CABLE SCHEDULE - ADMINISTRATION BUILDING G446-000-DW-0101-0031-01 R Engineering MEP DW A0 000

HVAC CONTROL BUILDERS WORK LAYOUT-ADMINISTRATION BUILDING G446-000-DW-0101-0032-01 R Engineering MEP DW A0 000

HVAC CONTROL LAYOUT - CANTEEN BUILDING G446-000-DW-0101-0033-01 R Engineering MEP DW A0 000

HVAC CONTROL CABLE SCHEDULE - CANTEEN BUILDING G446-000-DW-0101-0034-01 R Engineering MEP DW A0 000

HVAC CONTROL BUILDERS WORK LAYOUT-CANTEEN BUILDING G446-000-DW-0101-0035-01 R Engineering MEP DW A0 000

HVAC CONTROL LAYOUT - MAIN CONTROL BUILDING G446-000-DW-0101-0036-01 R Engineering MEP DW A0 000

HVAC CONTROL CABLE SCHEDULE - MAIN CONTROL BUILDING G446-000-DW-0101-0037-01 R Engineering MEP DW A0 000

HVAC CONTROL BUILDERS WORK LAYOUT-MAIN CONTROL BUILDING G446-000-DW-0101-0038-01 R Engineering MEP DW A0 000

HVAC CONTROL LAYOUT - TECHNICAL BUILDING G446-000-DW-0101-0039-01 R Engineering MEP DW A0 000

HVAC CONTROL CABLE SCHEDULE - TECHNICAL BUILDING G446-000-DW-0101-0040-01 R Engineering MEP DW A0 000

HVAC CONTROL BUILDERS WORK LAYOUT-TECHNICAL BUILDING G446-000-DW-0101-0041-01 R Engineering MEP DW A0 000

HVAC CONTROL LAYOUT - MAIN LABORATORY BUILDING G446-000-DW-0101-0042-01 R Engineering MEP DW A0 000

HVAC CONTROL CABLE SCHEDULE - MAIN LABORATORY BUILDING G446-000-DW-0101-0043-01 R Engineering MEP DW A0 000

HVAC CONTROL BUILDERS WORK LAYOUT-MAIN LABORATORY BUILDING G446-000-DW-0101-0044-01 R Engineering MEP DW A0 000

HVAC CONTROL LAYOUT - SUBSTATION BUILDING ( SS 01) G446-000-DW-0101-0045-01 R Engineering MEP DW A0 000

HVAC CONTROL CABLE SCHEDULE - SUBSTATION BUILDING ( SS 01) G446-000-DW-0101-0046-01 R Engineering MEP DW A0 000

HVAC CONTROL BUILDERS WORK LAYOUT-SUBSTATION BUILDING ( SS 01) G446-000-DW-0101-0047-01 R Engineering MEP DW A0 000

HVAC TYPICAL DETAILS - CONTROL - ALL BLDGS. G446-000-DW-0101-0048-01 R Engineering MEP DW A0 000

MATERIAL SUBMITTAL

BULK MATERIAL SUBMITTAL - CONTROL - ALL BLDGS. G446-000-MR-0101-0008-01 R Engineering MEP MR A4 000

IMPORTANT NOTE: SCHEDULED DATE SHALL NOT BE CHANGED. Page 1 of 7


Document Nature Discipline Doc Type Doc Size Project Unit Category
Engineering CV AE A0 000 Approval
Quality CC BM A1 101 Information
VendorProgress CN BQ A2 102 Review
CM CA A3 103
DC CBT A4 104
EL CE 105
EN CL 107
HSE CN
108
IN CO
109
MEP CP
201
MER CR 202
MES CS
203
PP DB 301
PC DD 311
PRO DI 321
PE DK 351
PE DL 701
PM DM
702
QM DQP
703
HS DS 704
DW 800
DZ 801
ED 802
EL 803
FBT 804
FM 805
FQ 806
FS
808
GN 809
GTC
810
HD 811
HR 812
HS 813
IN 814
IRC 815
ITP 900
JSC 901
JSD 902
JSM 903
JSS 999
LI
ML
MR
MS
MSD
MTO
NCR
NM
NV
OI
OM
PC
PD
PDS
PFD
PH
PI
PID
PL
PO
PP
PQ
PR
PS
PTC
QA
QCP
QCR
QR
RA
RDS
RN
RP
RQ
RT
SA
SC
SH
SI
SL
SOW
SP
SQ
SR
ST
STC
STD
SU
TB
TBT
TDS
TN
VL
VS
YX
YY
YZ
Discipline Full Form Doc Type Full Form
Civil and Structural Authorised Engineers List
Commissioning Bill of Material
Construction Bill of Quantity
Contracts / Commercial Calculations
Document Control Commercial Bid Evaluation
Electrical Contract Engineering
Engineering Contents Lists
Health, Safety & Calculation Notes, Design
Environment Basis, Process Description
Instrumentation &
Control COSHH Assessments
Detailed Construction/
Mechanical Packages Installation Procedure
Mechanical Rotary Change Order
Mechanical Static
Equipment Construction Strategies
Piping and Layout Design Basis
Process Fabrication Detailed Drawings
Procurement Discipline Design Instructions
Project Engineering PC Discs (Including Backups)
Project Execution Deviation List
Project Management ,
Project Controls Distribution Matrix
Discipline Quality and HSE
Quality Plans
Safety Data Sheets
Drawings
Vendor Documents
Engineering Documents
Equipment Lists
Final Bid Tabulations
Forms
Field Queries
Functional Specifications -
Major Control Systems
General Notes
General Terms & Conditions for
PO / Sub Contract
Handover Dossiers (Site Only)
HAZOP Reports
Hazardous Material Schedule
Document/Drawing Indexes
Inspection Release Certificates
Inspection & Test Plans
Job Specification for Construction
Job Specification for Design
Job Specification for Management
Job Specification for Supply
Lists
Dossier, Manuals
Material Requisitions
Method Statements
Material Selection Diagrams
Material Take off
Non Conformance Report
List and Registers ( other than
DL &EL)
Narratives
Operating Instructions
Operating Manual
Miscellaneous Process Deliverables
Price Description and
Measuring Conventions
Process Data Sheets
Process Flow Diagrams
Philosophy
Project Instructions
Process & Instrumentation
Diagrams
Planning & Schedules
Purchase Orders
Project Procedures
Purchase Requisition
Purchase Requisition
Price Schedules
Particular Terms & Conditions
for Subcontract
Quality Assurance Documents
Quality Control Plans
Quality Control Reports
Quotation requests
Risk Assessments
Room Data Sheets ( White
Rooms)
Release Note ( for Delivery)
Reports
Material Requisition
Report
Safety Documentation
Control Requisitions
Schedules
Special Piping Items
Bidders / Suppliers /
Subcontractors List
Scope of Work
Specifications
Site Queries (sent to Home
Office for resolution)
Scope of Supply
Studies
Construction Standards
Design Standards
Summary
Technical Bid Evaluation
Technical Bid Tebulations
Heat Transfer (TEMA) Data Sheets
Technical Notes
Vendor List
Instrument Vessel Sketches
Process Licensor Information /
Documents
Client Document
Client Specification / Standards