Anda di halaman 1dari 15

Oktober

No Description Of Work Bobot 1 2


3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
I Pekerjaan Persiapan
1 Persiapan alat kerja 0.727% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011%
2 Mobilisasi 0.872% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013%
3 Koordinasi building & security 0.364% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005%
4 Buang puing 0.698% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010%
5 Safety 0.218% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003%
6 Listrik dan air kerja 0.364% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005%
Sub Total I
II Pekerjaan Sipil
1 Pekerjaan waterproofing lantai area toilet 0.170%
2 Pekerjaan waterproofing dinding area toilet 0.128%

3 Pengadaan dan pemasangan partisi hoarding area 0.109%


tangga 0.036% 0.036% 0.036%
4 Pengadaan dan pemasangan pintu hoarding 0.000%
termasuk engsel dan kunci gembok
Penggantian plat talang existing dengan yang baru
5 0.000%
termasuk flinkote

6 Perbaikan façade ( cat exterior, waterproofing, 2.702%


perapihan dinding) 0.129% 0.129% 0.129% 0.129% 0.129% 0.129% 0.129% 0.129% 0.129%
Sub Total II
III Pekerjaan Arsitektur - Interior
Pengadaan dan pemasangan tralis jendela besi finish
1 9.995%
powder coating hitam
Pekerjaan re-paint frame aluminium existing dengan
2 0.000%
duco hitam

3 Pengadaan dan pemasangan kaca film rayben 60% 0.000%

Pengadaan dan pemasangan pintu kaca double swing


4 1.454%
frame besi hollow termasuk kusen

Pengadaan dan pemasangan pintu kaca single swing


5 0.727%
frame besi hollow termasuk kusen

Pengadaan dan pemasangan pintu multiplek finish


6 1.309%
HPL Taco dengan handle besi
Pengadaan dan pemasangan pintu cermin frame
7 hollow besi area depan dan plywood finish HPL pada 0.800%
bagian belakang

8 Pengadaan dan pemasangan jendela kaca rangka 0.436%


hollow di atas pintu

Pengadaan dan pemasangan Homogenous Tile


9 15.749%
ukuran 60x60 termasuk area tangga+ tegel kunci
0.321% 0.321%
Pengadaan dan pemasangan Homogenous Tile
10 0.000%
ukuran 60x60
Pengadaan dan pemasangan lantai vynil termasuk
11 0.000%
acian lantai
Pengadaan dan pemasangan dinding partisi gypsum
12 3.285%
rangka hollow
Oktober
No Description Of Work Bobot 1 2
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

13 Pengadaan dan pemasangan rangka besi hollow 1.803%


finish zynchromate dan cat
14 Pekerjaan pengecatan dinding interior existing 1.035%

15 Pekerjaan finishing dinding dan partisi dengan acian 1.577%

Pengadaan dan pemasangan bata merah tempel


16 termasuk cover dinding existing untuk menambah 2.061%
ketebalan
Pengadaan dan pemasangan partisi kaca tempered
17 2.718%
untuk ruang meeting

Pengadaan dan pemasangan meja wastafel solid


18 3.199%
surface termasuk backing lebar 650 mm

Pengadaan dan pemasangan cubicle toilet termasuk


19 2.230%
acc
20 Pengadaan dan pemasangan pintu closet 0.872%
21 Pengecatan rangka atap area void 0.000%
22 Pengecatan dinding partisi area void 0.254%

23 0.400%
Pengadaan dan pemasangan plafond GRC area toilet
24 Pengecatan plafond GRC area toilet 0.070%
25 Pengecatan rangka atap area office 0.000%
27 Cleaning area 0.145%
Sub Total III
IV Pekerjaan Sanitary
1 Pengadaan dan pemasangan wastafel 0.698%
2 Pengadaan dan pemasangan faucet wastafel 0.727%
3 Pengadaan dan pemasangan urinoir 0.436%
4 Pengadaan dan pemasangan closet duduk 1.018%
5 Pengadaan dan pemasangan shower spray 0.167%
6 Pengadaan dan pemasangan floor drain 0.160%
7 Pengadaan dan pemasangan shower 0.138%
Sub Total IV
A Pekerjaan Persiapan
1 Mobilisasi material 0.691% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010%
2 Pengadaan dan pemasangan scaffolding 0.364% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026%
B Pekerjaan Sipil
Pekerjaan pembobokan dinding keramik area
1 0.333%
toilet 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024%
2 Pekerjaan pembobokan dinding bata 0.073% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005%
3 Pekerjaan pembobokan lantai keramik 0.085% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006%

4 Pekerjaan pembobokan lantai tangga 0.021%


0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002%
5 Pekerjaan pembongkaran sanitary existing 0.055% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004%
6 Pekerjaan bongkar screeding existing 1.065% 0.076% 0.076% 0.076% 0.076% 0.076% 0.076% 0.076% 0.076% 0.076% 0.076% 0.076% 0.076% 0.076% 0.076%
Oktober
No Description Of Work Bobot 1 2
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

7 Pekerjaan ceiling flat gypsum rangka hollow 7.190%

8 Pengecatan ceiling gypsum 1.438%


9 Pengadaan dan pemasangan lantai tegel 8.310%

10 Pengadaan dan pemasangan ceiling lamela 14.451%

Pengadaan dan pemasangan partisi 2 sisi diatas


11 1.431%
jendela area void
Pengadaan dan pemasangan plafond area talang
12 1.200%
outdoor 0.086% 0.086%
13 Pengecatan plafond area talang outdoor 0.216%

Pengadaan dan pemasangan pintu multiplek


14 0.327%
finish HPL Taco dengan handle besi

15 Pengadaan dan pemasangan vynil 0.518%


16 Pengadaan dan pemasangan inlay stainless 1.908%

17 Pekerjaan cleaning jendela aluminium existing 0.509%


0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024%

Total 100% 0.23% 0.23% 0.23% 0.19% 0.19% 0.19% 0.19% 0.35% 0.35% 0.35% 0.35% 0.35% 0.35% 0.35% 0.62% 0.62%
Grand Total 0.23% 0.45% 0.68% 0.87% 1.06% 1.25% 1.44% 1.80% 2.15% 2.50% 2.86% 3.21% 3.56% 3.92% 4.53% 5.15%
Oktober
No Description Of Work Bobot 3 4 1
19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4
I Pekerjaan Persiapan
1 Persiapan alat kerja 0.727% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011%
2 Mobilisasi 0.872% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013%
3 Koordinasi building & security 0.364% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005%
4 Buang puing 0.698% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010%
5 Safety 0.218% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003%
6 Listrik dan air kerja 0.364% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005%
Sub Total I
II Pekerjaan Sipil
1 Pekerjaan waterproofing lantai area toilet 0.170%
2 Pekerjaan waterproofing dinding area toilet 0.128%

3 Pengadaan dan pemasangan partisi hoarding area 0.109%


tangga
4 Pengadaan dan pemasangan pintu hoarding 0.000%
termasuk engsel dan kunci gembok
Penggantian plat talang existing dengan yang baru
5 0.000%
termasuk flinkote

6 Perbaikan façade ( cat exterior, waterproofing, 2.702%


perapihan dinding) 0.129% 0.129% 0.129% 0.129% 0.129% 0.129% 0.129% 0.129% 0.129% 0.129% 0.129% 0.129%
Sub Total II
III Pekerjaan Arsitektur - Interior
Pengadaan dan pemasangan tralis jendela besi finish
1 9.995%
powder coating hitam
Pekerjaan re-paint frame aluminium existing dengan
2 0.000%
duco hitam

3 Pengadaan dan pemasangan kaca film rayben 60% 0.000%

Pengadaan dan pemasangan pintu kaca double swing


4 1.454%
frame besi hollow termasuk kusen

Pengadaan dan pemasangan pintu kaca single swing


5 0.727%
frame besi hollow termasuk kusen

Pengadaan dan pemasangan pintu multiplek finish


6 1.309%
HPL Taco dengan handle besi
Pengadaan dan pemasangan pintu cermin frame
7 hollow besi area depan dan plywood finish HPL pada 0.800%
bagian belakang

8 Pengadaan dan pemasangan jendela kaca rangka 0.436%


hollow di atas pintu

Pengadaan dan pemasangan Homogenous Tile


9 15.749%
ukuran 60x60 termasuk area tangga+ tegel kunci
0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321%
Pengadaan dan pemasangan Homogenous Tile
10 0.000%
ukuran 60x60
Pengadaan dan pemasangan lantai vynil termasuk
11 0.000%
acian lantai
Pengadaan dan pemasangan dinding partisi gypsum
12 3.285%
rangka hollow
Oktober
No Description Of Work Bobot 3 4 1
19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4

13 Pengadaan dan pemasangan rangka besi hollow 1.803%


finish zynchromate dan cat
14 Pekerjaan pengecatan dinding interior existing 1.035%

15 Pekerjaan finishing dinding dan partisi dengan acian 1.577%

Pengadaan dan pemasangan bata merah tempel


16 termasuk cover dinding existing untuk menambah 2.061%
ketebalan
Pengadaan dan pemasangan partisi kaca tempered
17 2.718%
untuk ruang meeting

Pengadaan dan pemasangan meja wastafel solid


18 3.199%
surface termasuk backing lebar 650 mm

Pengadaan dan pemasangan cubicle toilet termasuk


19 2.230%
acc
20 Pengadaan dan pemasangan pintu closet 0.872%
21 Pengecatan rangka atap area void 0.000%
22 Pengecatan dinding partisi area void 0.254%

23 0.400%
Pengadaan dan pemasangan plafond GRC area toilet
24 Pengecatan plafond GRC area toilet 0.070%
25 Pengecatan rangka atap area office 0.000%
27 Cleaning area 0.145%
Sub Total III
IV Pekerjaan Sanitary
1 Pengadaan dan pemasangan wastafel 0.698%
2 Pengadaan dan pemasangan faucet wastafel 0.727%
3 Pengadaan dan pemasangan urinoir 0.436%
4 Pengadaan dan pemasangan closet duduk 1.018%
5 Pengadaan dan pemasangan shower spray 0.167%
6 Pengadaan dan pemasangan floor drain 0.160%
7 Pengadaan dan pemasangan shower 0.138%
Sub Total IV
A Pekerjaan Persiapan
1 Mobilisasi material 0.691% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010%
2 Pengadaan dan pemasangan scaffolding 0.364%
B Pekerjaan Sipil
Pekerjaan pembobokan dinding keramik area
1 0.333%
toilet
2 Pekerjaan pembobokan dinding bata 0.073%
3 Pekerjaan pembobokan lantai keramik 0.085%

4 Pekerjaan pembobokan lantai tangga 0.021%

5 Pekerjaan pembongkaran sanitary existing 0.055%


6 Pekerjaan bongkar screeding existing 1.065%
Oktober
No Description Of Work Bobot 3 4 1
19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4

7 Pekerjaan ceiling flat gypsum rangka hollow 7.190%


0.266% 0.266% 0.266% 0.266%
8 Pengecatan ceiling gypsum 1.438%
9 Pengadaan dan pemasangan lantai tegel 8.310%

10 Pengadaan dan pemasangan ceiling lamela 14.451%

Pengadaan dan pemasangan partisi 2 sisi diatas


11 1.431%
jendela area void 0.102% 0.102% 0.102% 0.102%
Pengadaan dan pemasangan plafond area talang
12 1.200%
outdoor 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086%
13 Pengecatan plafond area talang outdoor 0.216% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015%

Pengadaan dan pemasangan pintu multiplek


14 0.327%
finish HPL Taco dengan handle besi

15 Pengadaan dan pemasangan vynil 0.518%


16 Pengadaan dan pemasangan inlay stainless 1.908%

17 Pekerjaan cleaning jendela aluminium existing 0.509%


0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024%

Total 100% 0.62% 0.62% 0.62% 0.62% 0.62% 0.63% 0.63% 0.63% 0.63% 0.63% 0.63% 0.63% 0.76% 0.76% 0.76% 0.76%
Grand Total 5.77% 6.39% 7.01% 7.62% 8.24% 8.88% 9.51% 10.14% 10.78% 11.41% 12.04% 12.68% 13.44% 14.20% 14.97% 15.73%
November
No Description Of Work Bobot
1 2 3
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
I Pekerjaan Persiapan
1 Persiapan alat kerja 0.727% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011%
2 Mobilisasi 0.872% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013%
3 Koordinasi building & security 0.364% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005%
4 Buang puing 0.698% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010%
5 Safety 0.218% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003%
6 Listrik dan air kerja 0.364% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005%
Sub Total I
II Pekerjaan Sipil
1 Pekerjaan waterproofing lantai area toilet 0.170% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024%
2 Pekerjaan waterproofing dinding area toilet 0.128% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018%
3 Pengadaan dan pemasangan partisi hoarding area 0.109%
tangga
4 Pengadaan dan pemasangan pintu hoarding 0.000%
termasuk engsel dan kunci gembok
Penggantian plat talang existing dengan yang baru
5 0.000%
termasuk flinkote

6 Perbaikan façade ( cat exterior, waterproofing, 2.702%


perapihan dinding)
Sub Total II
III Pekerjaan Arsitektur - Interior
Pengadaan dan pemasangan tralis jendela besi finish
1 9.995%
powder coating hitam 0.345% 0.345% 0.345% 0.345% 0.345% 0.345% 0.345% 0.345% 0.345% 0.345%
Pekerjaan re-paint frame aluminium existing dengan
2 0.000%
duco hitam

3 Pengadaan dan pemasangan kaca film rayben 60% 0.000%

Pengadaan dan pemasangan pintu kaca double swing


4 1.454%
frame besi hollow termasuk kusen

Pengadaan dan pemasangan pintu kaca single swing


5 0.727%
frame besi hollow termasuk kusen

Pengadaan dan pemasangan pintu multiplek finish


6 1.309%
HPL Taco dengan handle besi
Pengadaan dan pemasangan pintu cermin frame
7 hollow besi area depan dan plywood finish HPL pada 0.800%
bagian belakang

8 Pengadaan dan pemasangan jendela kaca rangka 0.436%


hollow di atas pintu

Pengadaan dan pemasangan Homogenous Tile


9 15.749%
ukuran 60x60 termasuk area tangga+ tegel kunci
0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321%
Pengadaan dan pemasangan Homogenous Tile
10 0.000%
ukuran 60x60
Pengadaan dan pemasangan lantai vynil termasuk
11 0.000%
acian lantai
Pengadaan dan pemasangan dinding partisi gypsum
12 3.285%
rangka hollow 0.235% 0.235% 0.235% 0.235% 0.235% 0.235% 0.235% 0.235% 0.235% 0.235% 0.235% 0.235% 0.235% 0.235%
November
No Description Of Work Bobot
1 2 3
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

13 Pengadaan dan pemasangan rangka besi hollow 1.803%


finish zynchromate dan cat
14 Pekerjaan pengecatan dinding interior existing 1.035%

15 Pekerjaan finishing dinding dan partisi dengan acian 1.577%

Pengadaan dan pemasangan bata merah tempel


16 termasuk cover dinding existing untuk menambah 2.061%
ketebalan
Pengadaan dan pemasangan partisi kaca tempered
17 2.718%
untuk ruang meeting

Pengadaan dan pemasangan meja wastafel solid


18 3.199%
surface termasuk backing lebar 650 mm
0.160% 0.160% 0.160%
Pengadaan dan pemasangan cubicle toilet termasuk
19 2.230%
acc 0.112% 0.112% 0.112%
20 Pengadaan dan pemasangan pintu closet 0.872%
21 Pengecatan rangka atap area void 0.000%
22 Pengecatan dinding partisi area void 0.254% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025%
23 0.400%
Pengadaan dan pemasangan plafond GRC area toilet 0.029% 0.029% 0.029% 0.029%
24 Pengecatan plafond GRC area toilet 0.070% 0.023% 0.023% 0.023%
25 Pengecatan rangka atap area office 0.000%
27 Cleaning area 0.145% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004%
Sub Total III
IV Pekerjaan Sanitary
1 Pengadaan dan pemasangan wastafel 0.698%
2 Pengadaan dan pemasangan faucet wastafel 0.727%
3 Pengadaan dan pemasangan urinoir 0.436%
4 Pengadaan dan pemasangan closet duduk 1.018%
5 Pengadaan dan pemasangan shower spray 0.167%
6 Pengadaan dan pemasangan floor drain 0.160%
7 Pengadaan dan pemasangan shower 0.138%
Sub Total IV
A Pekerjaan Persiapan
1 Mobilisasi material 0.691% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010%
2 Pengadaan dan pemasangan scaffolding 0.364%
B Pekerjaan Sipil
Pekerjaan pembobokan dinding keramik area
1 0.333%
toilet
2 Pekerjaan pembobokan dinding bata 0.073%
3 Pekerjaan pembobokan lantai keramik 0.085%

4 Pekerjaan pembobokan lantai tangga 0.021%

5 Pekerjaan pembongkaran sanitary existing 0.055%


6 Pekerjaan bongkar screeding existing 1.065%
November
No Description Of Work Bobot
1 2 3
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

7 Pekerjaan ceiling flat gypsum rangka hollow 7.190%


0.266% 0.266% 0.266% 0.266% 0.266% 0.266% 0.266% 0.266% 0.266% 0.266% 0.266% 0.266% 0.266% 0.266% 0.266% 0.266%
8 Pengecatan ceiling gypsum 1.438%
9 Pengadaan dan pemasangan lantai tegel 8.310% 0.462% 0.462% 0.462%

10 Pengadaan dan pemasangan ceiling lamela 14.451%


0.688% 0.688% 0.688% 0.688% 0.688% 0.688%
Pengadaan dan pemasangan partisi 2 sisi diatas
11 1.431%
jendela area void 0.102% 0.102% 0.102% 0.102% 0.102% 0.102% 0.102% 0.102% 0.102% 0.102%
Pengadaan dan pemasangan plafond area talang
12 1.200%
outdoor
13 Pengecatan plafond area talang outdoor 0.216% 0.015% 0.015% 0.015%

Pengadaan dan pemasangan pintu multiplek


14 0.327%
finish HPL Taco dengan handle besi

15 Pengadaan dan pemasangan vynil 0.518% 0.037% 0.037% 0.037% 0.037% 0.037% 0.037%
16 Pengadaan dan pemasangan inlay stainless 1.908%

17 Pekerjaan cleaning jendela aluminium existing 0.509%

Total 100% 0.76% 0.76% 1.00% 0.99% 0.99% 0.99% 1.36% 1.39% 1.43% 1.43% 2.05% 2.05% 2.05% 2.76% 2.76% 2.71%
Grand Total 16.49% 17.26% 18.25% 19.24% 20.23% 21.21% 22.57% 23.96% 25.39% 26.82% 28.86% 30.91% 32.95% 35.71% 38.46% 41.18%
No Description Of Work 3 Bobot 4 1
21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6
I Pekerjaan Persiapan
1 Persiapan alat kerja 0.727% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011%
2 Mobilisasi 0.872% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013%
3 Koordinasi building & security 0.364% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005%
4 Buang puing 0.698% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010%
5 Safety 0.218% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003%
6 Listrik dan air kerja 0.364% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005%
Sub Total I
II Pekerjaan Sipil
1 Pekerjaan waterproofing lantai area toilet 0.170%
2 Pekerjaan waterproofing dinding area toilet 0.128%

3 Pengadaan dan pemasangan partisi hoarding area 0.109%


tangga
4 Pengadaan dan pemasangan pintu hoarding 0.000%
termasuk engsel dan kunci gembok
Penggantian plat talang existing dengan yang baru
5 0.000%
termasuk flinkote

6 Perbaikan façade ( cat exterior, waterproofing, 2.702%


perapihan dinding)
Sub Total II
III Pekerjaan Arsitektur - Interior
Pengadaan dan pemasangan tralis jendela besi finish
1 9.995%
powder coating hitam 0.345% 0.345% 0.345% 0.345% 0.345% 0.345% 0.345% 0.345% 0.345% 0.345% 0.345% 0.345% 0.345% 0.345% 0.345% 0.345%
Pekerjaan re-paint frame aluminium existing dengan
2 0.000%
duco hitam

3 Pengadaan dan pemasangan kaca film rayben 60% 0.000%

Pengadaan dan pemasangan pintu kaca double swing


4 1.454%
frame besi hollow termasuk kusen
0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086%

Pengadaan dan pemasangan pintu kaca single swing


5 0.727%
frame besi hollow termasuk kusen
0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086%
Pengadaan dan pemasangan pintu multiplek finish
6 1.309%
HPL Taco dengan handle besi 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086%
Pengadaan dan pemasangan pintu cermin frame
7 hollow besi area depan dan plywood finish HPL pada 0.800%
bagian belakang 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086%
8 Pengadaan dan pemasangan jendela kaca rangka 0.436%
hollow di atas pintu 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086%

Pengadaan dan pemasangan Homogenous Tile


9 15.749%
ukuran 60x60 termasuk area tangga+ tegel kunci
0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321% 0.321%
Pengadaan dan pemasangan Homogenous Tile
10 0.000%
ukuran 60x60
Pengadaan dan pemasangan lantai vynil termasuk
11 0.000%
acian lantai
Pengadaan dan pemasangan dinding partisi gypsum
12 3.285%
rangka hollow
No Description Of Work 3 Bobot 4 1
21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6

13 Pengadaan dan pemasangan rangka besi hollow 1.803%


finish zynchromate dan cat 0.113% 0.113% 0.113% 0.113% 0.113% 0.113% 0.113% 0.113% 0.113% 0.113% 0.113%
14 Pekerjaan pengecatan dinding interior existing 1.035% 0.104% 0.104% 0.104% 0.104% 0.104% 0.104%
15 Pekerjaan finishing dinding dan partisi dengan acian 1.577%
0.158% 0.158% 0.158% 0.158% 0.158% 0.158% 0.158% 0.158% 0.158% 0.158%

Pengadaan dan pemasangan bata merah tempel


16 termasuk cover dinding existing untuk menambah 2.061%
ketebalan 0.206% 0.206% 0.206% 0.206% 0.206% 0.206% 0.206% 0.206% 0.206% 0.206%
Pengadaan dan pemasangan partisi kaca tempered
17 2.718%
untuk ruang meeting 0.181% 0.181% 0.181% 0.181% 0.181% 0.181% 0.181% 0.181% 0.181% 0.181% 0.181% 0.181% 0.181% 0.181% 0.181%

Pengadaan dan pemasangan meja wastafel solid


18 3.199%
surface termasuk backing lebar 650 mm
0.160% 0.160% 0.160% 0.160% 0.160% 0.160% 0.160% 0.160% 0.160% 0.160% 0.160% 0.160% 0.160% 0.160% 0.160% 0.160%
Pengadaan dan pemasangan cubicle toilet termasuk
19 2.230%
acc 0.112% 0.112% 0.112% 0.112% 0.112% 0.112% 0.112% 0.112% 0.112% 0.112% 0.112% 0.112% 0.112% 0.112% 0.112% 0.112%
20 Pengadaan dan pemasangan pintu closet 0.872% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051%
21 Pengecatan rangka atap area void 0.000%
22 Pengecatan dinding partisi area void 0.254% 0.025%
23 0.400%
Pengadaan dan pemasangan plafond GRC area toilet
24 Pengecatan plafond GRC area toilet 0.070%
25 Pengecatan rangka atap area office 0.000%
27 Cleaning area 0.145% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004%
Sub Total III
IV Pekerjaan Sanitary
1 Pengadaan dan pemasangan wastafel 0.698%
2 Pengadaan dan pemasangan faucet wastafel 0.727%
3 Pengadaan dan pemasangan urinoir 0.436% 0.016% 0.016% 0.016%
4 Pengadaan dan pemasangan closet duduk 1.018% 0.048% 0.048% 0.048%
5 Pengadaan dan pemasangan shower spray 0.167% 0.008% 0.008% 0.008%
6 Pengadaan dan pemasangan floor drain 0.160% 0.008% 0.008% 0.008%
7 Pengadaan dan pemasangan shower 0.138% 0.007% 0.007% 0.007%
Sub Total IV
A Pekerjaan Persiapan
1 Mobilisasi material 0.691% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010%
2 Pengadaan dan pemasangan scaffolding 0.364%
B Pekerjaan Sipil
Pekerjaan pembobokan dinding keramik area
1 0.333%
toilet
2 Pekerjaan pembobokan dinding bata 0.073%
3 Pekerjaan pembobokan lantai keramik 0.085%

4 Pekerjaan pembobokan lantai tangga 0.021%

5 Pekerjaan pembongkaran sanitary existing 0.055%


6 Pekerjaan bongkar screeding existing 1.065%
No Description Of Work 3 Bobot 4 1
21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6

7 Pekerjaan ceiling flat gypsum rangka hollow 7.190%


0.266% 0.266% 0.266% 0.266% 0.266% 0.266% 0.266%
8 Pengecatan ceiling gypsum 1.438% 0.068% 0.068% 0.068% 0.068% 0.068% 0.068%
9 Pengadaan dan pemasangan lantai tegel 8.310% 0.462% 0.462% 0.462% 0.462% 0.462% 0.462% 0.462% 0.462% 0.462% 0.462% 0.462% 0.462% 0.462% 0.462% 0.462%

10 Pengadaan dan pemasangan ceiling lamela 14.451%


0.688% 0.688% 0.688% 0.688% 0.688% 0.688% 0.688% 0.688% 0.688% 0.688% 0.688% 0.688% 0.688% 0.688% 0.688%
Pengadaan dan pemasangan partisi 2 sisi diatas
11 1.431%
jendela area void
Pengadaan dan pemasangan plafond area talang
12 1.200%
outdoor
13 Pengecatan plafond area talang outdoor 0.216%

Pengadaan dan pemasangan pintu multiplek


14 0.327%
finish HPL Taco dengan handle besi
0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023%
15 Pengadaan dan pemasangan vynil 0.518% 0.037% 0.037% 0.037% 0.037% 0.037% 0.037% 0.037% 0.037%
16 Pengadaan dan pemasangan inlay stainless 1.908% 0.273% 0.273% 0.273% 0.273% 0.273%

17 Pekerjaan cleaning jendela aluminium existing 0.509%

Total 100% 3.02% 3.50% 3.50% 3.50% 3.50% 3.61% 3.61% 3.35% 3.31% 3.31% 3.12% 3.39% 3.48% 3.48% 3.48% 1.71%
Grand Total 44.20% 47.70% 51.20% 54.70% 58.20% 61.81% 65.43% 68.77% 72.08% 75.39% 78.51% 81.90% 85.38% 88.86% 92.33% 94.05%
Desember
No Description Of Work Bobot 2 3 4
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
I Pekerjaan Persiapan
1 Persiapan alat kerja 0.727% 0.011% 0.011% 0.011%
2 Mobilisasi 0.872% 0.013% 0.013% 0.013%
3 Koordinasi building & security 0.364% 0.005% 0.005% 0.005% 0.005% 0.005%
4 Buang puing 0.698% 0.010% 0.010% 0.010% 0.010% 0.010%
5 Safety 0.218% 0.003% 0.003% 0.003% 0.003% 0.003%
6 Listrik dan air kerja 0.364% 0.005% 0.005% 0.005% 0.005% 0.005%
Sub Total I
II Pekerjaan Sipil
1 Pekerjaan waterproofing lantai area toilet 0.170%
2 Pekerjaan waterproofing dinding area toilet 0.128%

3 Pengadaan dan pemasangan partisi hoarding area 0.109%


tangga
4 Pengadaan dan pemasangan pintu hoarding 0.000%
termasuk engsel dan kunci gembok
Penggantian plat talang existing dengan yang baru
5 0.000%
termasuk flinkote

6 Perbaikan façade ( cat exterior, waterproofing, 2.702%


perapihan dinding)
Sub Total II
III Pekerjaan Arsitektur - Interior
Pengadaan dan pemasangan tralis jendela besi finish
1 9.995%
powder coating hitam 0.345% 0.345% 0.345%
Pekerjaan re-paint frame aluminium existing dengan
2 0.000%
duco hitam

3 Pengadaan dan pemasangan kaca film rayben 60% 0.000%

Pengadaan dan pemasangan pintu kaca double swing


4 1.454%
frame besi hollow termasuk kusen
0.086% 0.086%

Pengadaan dan pemasangan pintu kaca single swing


5 0.727%
frame besi hollow termasuk kusen
0.086% 0.086%
Pengadaan dan pemasangan pintu multiplek finish
6 1.309%
HPL Taco dengan handle besi 0.086% 0.086%
Pengadaan dan pemasangan pintu cermin frame
7 hollow besi area depan dan plywood finish HPL pada 0.800%
bagian belakang 0.086% 0.086%
8 Pengadaan dan pemasangan jendela kaca rangka 0.436%
hollow di atas pintu 0.086% 0.086%

Pengadaan dan pemasangan Homogenous Tile


9 15.749%
ukuran 60x60 termasuk area tangga+ tegel kunci

Pengadaan dan pemasangan Homogenous Tile


10 0.000%
ukuran 60x60
Pengadaan dan pemasangan lantai vynil termasuk
11 0.000%
acian lantai
Pengadaan dan pemasangan dinding partisi gypsum
12 3.285%
rangka hollow
Desember
No Description Of Work Bobot 2 3 4
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

13 Pengadaan dan pemasangan rangka besi hollow 1.803%


finish zynchromate dan cat 0.113% 0.113% 0.113% 0.113% 0.113%
14 Pekerjaan pengecatan dinding interior existing 1.035% 0.104% 0.104% 0.104% 0.104%
15 Pekerjaan finishing dinding dan partisi dengan acian 1.577%

Pengadaan dan pemasangan bata merah tempel


16 termasuk cover dinding existing untuk menambah 2.061%
ketebalan
Pengadaan dan pemasangan partisi kaca tempered
17 2.718%
untuk ruang meeting

Pengadaan dan pemasangan meja wastafel solid


18 3.199%
surface termasuk backing lebar 650 mm
0.160%
Pengadaan dan pemasangan cubicle toilet termasuk
19 2.230%
acc 0.112%
20 Pengadaan dan pemasangan pintu closet 0.872% 0.051% 0.051%
21 Pengecatan rangka atap area void 0.000%
22 Pengecatan dinding partisi area void 0.254%

23 0.400%
Pengadaan dan pemasangan plafond GRC area toilet
24 Pengecatan plafond GRC area toilet 0.070%
25 Pengecatan rangka atap area office 0.000%
27 Cleaning area 0.145% 0.004% 0.004% 0.004% 0.004% 0.004%
Sub Total III
IV Pekerjaan Sanitary
1 Pengadaan dan pemasangan wastafel 0.698%
2 Pengadaan dan pemasangan faucet wastafel 0.727%
3 Pengadaan dan pemasangan urinoir 0.436%
4 Pengadaan dan pemasangan closet duduk 1.018%
5 Pengadaan dan pemasangan shower spray 0.167%
6 Pengadaan dan pemasangan floor drain 0.160%
7 Pengadaan dan pemasangan shower 0.138%
Sub Total IV
A Pekerjaan Persiapan
1 Mobilisasi material 0.691% 0.010% 0.010% 0.010% 0.010% 0.010%
2 Pengadaan dan pemasangan scaffolding 0.364%
B Pekerjaan Sipil
Pekerjaan pembobokan dinding keramik area
1 0.333%
toilet
2 Pekerjaan pembobokan dinding bata 0.073%
3 Pekerjaan pembobokan lantai keramik 0.085%

4 Pekerjaan pembobokan lantai tangga 0.021%

5 Pekerjaan pembongkaran sanitary existing 0.055%


6 Pekerjaan bongkar screeding existing 1.065%
Desember
No Description Of Work Bobot 2 3 4
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

7 Pekerjaan ceiling flat gypsum rangka hollow 7.190%

8 Pengecatan ceiling gypsum 1.438% 0.068% 0.068% 0.068% 0.068%


9 Pengadaan dan pemasangan lantai tegel 8.310%

10 Pengadaan dan pemasangan ceiling lamela 14.451%

Pengadaan dan pemasangan partisi 2 sisi diatas


11 1.431%
jendela area void
Pengadaan dan pemasangan plafond area talang
12 1.200%
outdoor
13 Pengecatan plafond area talang outdoor 0.216%

Pengadaan dan pemasangan pintu multiplek


14 0.327%
finish HPL Taco dengan handle besi

15 Pengadaan dan pemasangan vynil 0.518%


16 Pengadaan dan pemasangan inlay stainless 1.908% 0.273% 0.273%

17 Pekerjaan cleaning jendela aluminium existing 0.509%

Total 100% 1.71% 1.44% 0.69% 0.32% 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Grand Total 95.76% 97.21% 97.90% 98.22% 98.37% 98.37% 98.37% 98.37% 98.37% 98.37% 98.37% 98.37% 98.37% 98.37% 98.37% 98.37%