0.25
3. Pekerjan Plasteran
a. 75 m x 1.6 m = 240 m2
b. 75 m x 0.3 m = 22.5 m2
Jadi total Rencana Rabat Beton = 262.5 m2
5. Pekerjaan Plasteran
1. 4 m2 x 1.3 m2 = 10.4 m2
2. 0.5 m3 x 1.5 m3 = 3.00 m2
Jadi Total Plasteran = 26.8 m3
0.2
6. Pekerjaan Beton Bertulang
1. Pekerrjaan Plat = 4x 1.4 x 0.20 = 1.12 0.25
2. Pekerrjaan Plat = 4x 0.2 x 0.25 = 0.40
Jadi Total Pasangan Batu = 3.04 m3
7. Pembesian
Perhitungan Besi P = 5 m = 4+ 0.4 + 0.4 + 0.1 = 4.9
0.20 m = Jarak besi
Besi Ø 12 0.887 kg Besi Ø 8 0.393 kg
1 batang x 21 Titik 26.7 titik panjang :
4.9 m 1.02 m jarak :
91.27 kg 21.38 kg
10.64 kg perbatang (full) 4.716 kg perbatang (full)
8.58 btg 4.53 btg
Perhitungan Besi P = 1.4 m = 1.4 + 0.4 + 0.4 + 0.1 = 2.3
0.20 m = Jarak besi
Besi Ø 12 0.887 kg
1 batang x 42 Titik
2.3 m
85.68 kg
10.64 kg perbatang (full)
8.05 btg = Batang
C D
Luas = 0.106 m2
Galian = 0.041 m2
1
246,147
Luas I = 0.263
Luas II = 0.125
Luas = 0.388
0.2
4.6
0.6
0.8
0.40
0.2
A1 = 0.640 m2
A2 = 0.240 m2
Luas 0.400 m2
1.4 0.4
0.2
1.5
1
0.2
0.2
0.6
2.2
1.4
2.7777778
5.5555556
0.2 395.2
445.5467869222
37.1288989102
Diketehui Panjang Balok
Panjang Beugel
x 2 kolom 0.26
panjang : 4.00
jarak : 0.15 33.3333333333 26.724
1.1
perbatang (full) 36.6666666667
73.3333333333
28.82
2.4016666667
205.78
72.8 120
6.0666667 10
VOLUME
7.137 M2
5
BACK UP DATA QUANTITY
Kegiatan : Pengadaan Konstruksi Jaringan Irigasi Desa
Pekerjaan : Pengadaan Konstruksi Jaringan Irigasi Desa Papalang Kec. Papalang
Provinsi : Desa Papalang Kec. Papalang Kab. Mamuju
T.A. : 2011
Volume
PANJAN
TINGGI LEBAR 0.5 LUAS
NO. STA G Keterangan
(m³)
a b c d e k=((iM+iB)/2)xj
0 + 000 0.30 1.40 0.50 0.21
50.00 12.00
0.+ 050 0.30 1.80 0.50 0.27
50.00 13.75
0.+ 100 0.40 1.40 0.50 0.28
50.00 14.00
0.+ 150 0.40 1.40 0.50 0.28
50.00 12.25
0.+ 200 0.30 1.40 0.50 0.21
50.00 12.00
0.+ 250 0.30 1.80 0.50 0.27
50.00 13.50
0.+ 300 0.30 1.80 0.50 0.27
50.00 14.63
0.+ 350 0.35 1.80 0.50 0.32
50.00 15.75
0.+ 400 0.35 1.80 0.50 0.32
50.00 14.63
0.+ 450 0.30 1.80 0.50 0.27
50.00 15.75
0.+ 500 0.40 1.80 0.50 0.36
50.00 38.75
0.+ 550 0.70 3.40 0.50 1.19
50.00 65.88
0.+ 600 0.85 3.40 0.50 1.45
50.00 65.88
0.+ 650 0.70 3.40 0.50 1.19
50.00 55.25
0.+ 700 0.60 3.40 0.50 1.02
50.00 57.38
0.+ 750 0.75 3.40 0.50 1.28
50.00 65.88
0.+ 800 0.80 3.40 0.50 1.36
50.00 55.25
0.+ 850 0.50 3.40 0.50 0.85
50.00 36.13
0.+ 900 0.35 3.40 0.50 0.60
50.00 27.63
0.+ 950 0.30 3.40 0.50 0.51
50.00 18.00
1.+ 000 0.30 1.40 0.50 0.21
50.00 10.50
1.+ 050 0.30 1.40 0.50 0.21
50.00 10.50
1.+ 100 0.30 1.40 0.50 0.21
50.00 10.50
1.+ 150 0.30 1.40 0.50 0.21
50.00 14.00
1.+ 200 0.50 1.40 0.50 0.35
50.00 17.50
1.+ 250 0.50 1.40 0.50 0.35
50.00 17.50
1.+ 300 0.50 1.40 0.50 0.35
50.00 17.50
1.+ 350 0.50 1.40 0.50 0.35
50.00 40.25
1.+ 400 1.80 1.40 0.50 1.26
50.00 66.50
1.+ 450 2.00 1.40 0.50 1.40
50.00 61.25
1.+ 500 1.50 1.40 0.50 1.05
890.25 m³
- m³
890.25 m³
`
DAFTAR HARGA SATUAN BAHAN DAN UPAH
I BAHAN DASAR
Tanah Timbunan m3 105,000.00
Batu Kali m3 225,000.00
Batu Gunung m3 225,000.00
Batu Pecah 10 - 15 cm m3 293,000.00
Batu Pecah 7 - 10 cm m3 293,000.00
Batu Pecah 5 - 7 cm m3 293,000.00
Batu Pecah 3 - 5 cm m3 307,000.00
Batu Pecah 2 - 3 cm m3 310,750.00
Batu Pecah 1 - 2 cm m3 321,000.00
Batu Pecah 0,5 - 1 cm m3 335,000.00
Batu Alam 20 - 20 m2 149,600.00
Pasir : ###
a. Urug Pasir m3 100,000.00
b. Pasangan m3 238,000.00
c. Beton m3 238,000.00
d. Timbunan Pilihan (Top Soil) m3 105,000.00
Kerikil m3 270,000.00
Kapur Pasangan Kg 5,040.00
Semen PC (@ 40 Kg/Zak) ###
a. Merk Tonasa Zak 62,000.00
b. Merk Tonasa kg 1,550.00
c. Merk Bosowa Zak 54,000.00
d. Merk Bosowa kg 1,350.00
e. Merk Tiga Roda kg 38,400.00
f. Merk Union kg ###
Semen Warna (Bungkus) kg 11,840.00
Semen Putih @ 50 Kg/Zak Zak 71,000.00
Batu Bata / Bata Merah buah 700.00
###
II BAHAN KAYU ###
kayu Kelas I : ###
a. Balok (Bayam) m3 9,780,000.00
b. Papan (Bayam) m3 6,980,000.00
c. Balok (sawmil) m3 6,990,000.00
d. Papan (sawmil) m3 6,920,000.00
Kayu Kelas II : ###
a. Balok m3 6,592,000.00
b. Papan m3 6,901,000.00
Kayu Kelas III ###
a. Balok m3 3,229,100.00
b. Papan m3 3,625,600.00
Kayu untuk perancah m3 2,060,000.00
Kayu untuk konstruksi Jembatan m3 836,320.00
Kayu Bakar m3 2,253,040.00
Les Kayu m' 126,000.00
3,900.00
III BAHAN BAMBU & IJUK ###
Bambu batang 12,000.00
Ijuk Hitam m2 18,800.00
###
IV BETON CETAK ###
Bataco / conblok buah 1,360.00
Paving Blok K. 255 buah 4,680.00
Paving Blok Warna buah 2,240.00
Loster keramik 20 x 20 cm buah 48,000.00
Loster Beton 20 x 20 cm buah 37,000.00
###
V BAHAN LANTAI ###
Tegel PC Abu-abu 20 x 20 cm buah 2,720.00
Tegel Keramik Putih 20 x 20 cm dus 57,000.00
Tegel Keramik Putih 20 x 20 cm buah 1,763.20
Tegel Keramik Putih 20 x 25 cm dus 57,000.00
Tegel Keramik Putih 20 x 25 cm buah 2,400.00
Tegel Keramik Putih 30 x 30 cm dus 48,000.00
Tegel Keramik Putih 30 x 30 cm buah 4,326.67
Tegel Keramik Rock 33,3 x 33,3 cm m2 52,400.00
Tegel Keramik Putih 10 x 20 cm dus 41,920.00
Tegel Keramik Warna 20 x 20 cm dus 41,920.00
Tegel Keramik Warna 25 x 40 cm dus 44,080.00
Tegel Keramik Warna 30 x 30 cm dus 41,920.00
Tegel Keramik Warna 40 x 40 cm dus 45,760.00
Tegel Keramik Warna 45 x 45 cm dus 9,040.00
Tegel Keramik Warna 10 x 20 cm dus 41,920.00
Tegel Keramik Warna 10 x 20 cm bh 838.40
Tegel Porselin 11 x 11 cm dus 28,240.00
Tegel Plint PC 15 x 20 cm dus 27,360.00
Tegel Plint PC 15 x 15 cm dus 27,360.00
Tegel Plint 10 x 20 cm dus 41,920.00
Dryer Lantai dus 26,640.00
Keramik Granitto Motif Hitam 60 x 60 cm dus 380,000.00
Keramik Granitto Motif Hitam 60 x 60 cm bh 211,111.11
Keramik Granitto 60 x 60 cm dus 330,000.00
Keramik Granitto 60 x 60 cm bh 183,333.33
Marmer 60 x 60 cm dus 153,600.00
Marmer 60 x 60 cm m2 92,160.00
TAMAN
Mangkuk Pot. Motid d. 1 m bh 800,000.00
Pohon Palem Raja, Tinggi 1 m Phn 120,000.00
Pohon Palem Botol, Tinggi 1 m s/d 1.5 m Phn 125,000.00
Pohon Palem Putri Batang Besar, 1.50 m Phn 300,000.00
Pohon Zikas Hias, 1 m Phn 1,500,000.00
Pohon Glodokan Tinggi 1,5 m Phn 150,000.00
Pohon Ketapang tinggi 1 m Phn 70,000.00
Pohon Vinus Bonsai, 1 m Phn 200,000.00
Pohon Mangga Kelas 3 Rasa, 2 m Phn 210,000.00
Pohon Rambutan, 1.5 m Phn 70,000.00
Pohon Tiara Payung Phn 170,000.00
Rumput Gajah Bonsai m² 100,000.00
Kompos m² 110,000.00
###
A. PEKERJAAN PENDAHULUAN
1 M1 Pekerjaan Bouwplank
0.0040 m3 Papan Kls II 3,000,000.00 Rp
0.0040 m3 Balok Kls II 3,000,000.00 Rp
0.0150 Kg Paku Biasa 19,200.00 Rp
0.0200 hr Tukang Kayu 0.00 Rp
0.1500 hr Kepala Tukang Rp
0.0200 hr Juru Ukur Rp
Jumlah Harga Satuan Bahan Rp.
Jumlah Harga Satuan Upah Rp.
Rp
1 M1 PAGAR SEMENTARA
0.0070 m3 Balok Kelas II 3,000,000.00 Rp
1.2000 Lbr Seng Gelombang BJLS 33 6 Kk 49,920.00 Rp
0.1000 Kg Paku Biasa 19,200.00 Rp
0.0100 hr Tukang Kayu 0.00 Rp
0.2000 hr Kepala Tukang 0.00 Rp
0.5000 hr Pekerja 0.00 Rp
Jumlah Harga Satuan Bahan Rp.
Jumlah Harga Satuan Upah Rp.
Rp
12,000.00
12,000.00
288.00
-
-
-
24,000.00
288.00
24,288.00
21,000.00
59,904.00
1,920.00
-
-
-
82,824.00
-
82,824.00
-
-
-
-
60,000.00
57,000.00
9,600.00
858.00
36,000.00
32,500.00
22,050.00
21,000.00
424,320.00
72,200.00
12,000.00
28,050.00
65,000.00
840,578.00
164,800.00
-
164,800.00
164,800.00
-
164,800.00
164,800.00
-
164,800.00
16,480.00
82,400.00
10,300.00
92,700.00
9,270.00
61,800.00
2,575.00
64,375.00
41,200.00
5,150.00
46,350.00
126,000.00
24,720.00
4,995.00
126,000.00
29,715.00
155,715.00
192,000.00
24,720.00
25,750.00
192,000.00
50,470.00
242,470.00
120,000.00
24,720.00
1,030.00
120,000.00
25,750.00
145,750.00
24,720.00
25,750.00
50,470.00
151,200.00
51,840.00
64,272.00
23,400.00
2,925.00
4,017.00
203,040.00
94,614.00
297,654.00
151,200.00
233,090.00
115,430.00
45,000.00
5,625.00
123,600.00
7,725.00
499,720.00
181,950.00
681,670.00
175,500.00
123,760.00
337,900.00
1,213,235.29
342.00
26,250.00
7,680.00
-
-
-
-
1,884,667.29
DAFTAR KUANTITAS DAN HARGA
UNIT KERJA : DINAS TENAGA KERJA DAN TRANSMIGRASI PROV. SULAWESI BARAT
KABUPATEN : MAMUJU
1 2 3 4 5
I PEKERJAAN PERSIAPAN
II PEKERJAAN PASANGAN
IV PEKERJAAN AKHIR
1 Dokumentasi dan laporan akhir Ls 1.00 Ls
2 Asbuilt drawing dan back up data Ls 1.00 Ls
3 Pembersihan lokasi ls 1.00 Ls
JUMLAH
AN HARGA
V. SULAWESI BARAT
ENAGA KERJA
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
6 7
Rp 500,000.00 Rp 500,000.00
Rp 500,000.00 Rp 500,000.00
Rp 750,000.00 Rp 750,000.00
Rp 64,375 Rp 69,862,968.75
Rp 681,670 Rp 17,996,088.00
Rp 1,884,667 Rp 4,523,201.51
Rp 681,670.0 Rp 17,169,563.13
Rp 109,551,821.38
Rp 64,375.00 Rp -
Rp 145,750.00 Rp -
Rp 242,470.00 Rp -
Rp 1,204,860.50
Rp 39,688,852.63
Rp -
Rp -
Rp -
Rp -
NO URAIAN PEKERJAAN KUANTITAS SATUAN UKURAN HARGA SATUAN (Rp)
Rp 13,844,542
Rp 9,487,617
Rp 13,928,625
Rp 3,600,000
Rp 560,000
Rp 200,000
Rp 1,000,000
Rp 42,620,784.0
Rp 42,620,784.0
Rp 42,620,784.00
REKAPITULASI RENCANA ANGGARAN B
NO. URAIAN
1 2
I. PEKERJAAN PERSIAPAN
II PEKERJAAN PASANGAN
IV PEKERJAAN AKHIR
Real Cost
PPN 10 %
Jumlah
Dibulatkan
TERBILANG :
SERATUS DUA PULUH JUTA LIMA RATUS TUJUH RIBU RUPIAH,-
Diketahui
Pejabat Pelaksana Teknis Kegiatan
(PPTK)
YOHANIS KAMUDI,SE
Nip.19600824 198603 1 024
Mengetahui :
KPA Dinas Tenaga Kerja Dan Transmigrasi
Provinsi Sulawesi Barat
DARMAWATI,S.PD.M.AP.
Nip.198720418 199803 2 005
APITULASI RENCANA ANGGARAN BIAYA
JUMLAH HARGA
3
Rp 69,862,968.75
Rp 39,688,852.63
Rp -
Rp 109,551,821.38
Rp 10,955,182.14
Rp 120,507,003.52
Rp 120,507,000.00
Dibuat Oleh :
Konsultan Perencana
CV. Rancang Rencana Indonesia
Ir.MUSMULIYADI
Direktur
KPA Dinas Tenaga Kerja Dan Transmigrasi
Provinsi Sulawesi Barat
DARMAWATI,S.PD.M.AP.
Nip.198720418 199803 2 005
200,000,000.00
24,000,000.00 jenti
176,000,000.00 85,000,000.00
0
88,000,000.00
100,000,000.00
12,000,000.00
88,000,000.00
35,200,000.00
52,800,000.00
Galian Tanah
0.5
91,000,000.00
JENTI
36,000,000.00 jenti 121,000,000.00
16,800,000.00
120,507,000.00
110,500,000.00
(10,007,000.00)
PERHITUNGAN BANGUNAN JARINGAN AIR BERSIH
KECAMATAN ARALLE KABUPATEN MAMASA
C D
A
C D