Menggali 1m3 tanah biasa

NO Uraian Koefesien satuan harga satuan jumlah harga satuan


1 pekerja 0.750 HOK 117,600.00 88,200.000
2 mandor 0.025 HOK 152,000.00 3,800.000
92,000.000
PEKERJAAN PASIR URUG 1m3
NO Uraian Koefesien satuan harga satuan jumlah harga satuan
1 pekerja 0.05 HOK 117,600.00 5,880.00
2 mandor 0.005 HOK 152,000.00 760.00
TOTAL HARGA 6,640.00

PEKERJAAN PONDASI BATU KALI 1PC : 3PP


NO Uraian Koefesien satuan harga satuan jumlah harga satuan
1 Batu kali 15cm/20cm 1.2 m3 326,200.00 391,440.00
2 Semen 202 kg 1,630.00 329,260.00
3 Pasir 0.485 m3 191,300.00 92,780.50
4 Pekerja 1.5 HOK 117,600.00 176,400.00
5 Tukang batu 0.75 HOK 172,600.00 129,450.00
6 Kepala tukang 0.075 HOK 180,000.00 13,500.00
7 Mandor 0.075 HOK 152,000.00 11,400.00
TOTAL HARGA 1,144,230.50

PEKERJAAN SLOOF
NO Uraian Koefesien satuan harga satuan jumlah harga satuan
1 kayu kelas III 0.27 m3 5,688,000.00 1,535,760.00
2 Paku 2 kg 21,300.00 42,600.00
3 Minyak bekisting 0.6 liter 2,000.00 1,200.00
4 Besi beton polos 210 kg 15,400.00 3,234,000.00
5 Kawat beton 3 kg 22,500.00 67,500.00
6 Semen 336 kg 1,630.00 547,680.00
7 Pasir 0.54 m3 191,300.00 103,302.00
Kerikil 0.81 m3 280,600.00 227,286.00
Pekerja 5.6 HOK 117,600.00 658,560.00
Tukang batu 0.275 HOK 172,600.00 47,465.00
Tukang kayu 1.56 HOK 195,000.00 304,200.00
Tukang besi 1.4 HOK 172,600.00 241,640.00
Kepala tukang 0.323 HOK 180,000.00 58,140.00
Mandor 0.283 HOK 152,000.00 43,016.00
TOTAL HARGA 7,112,349.00

PEKERJAAN LANTAI KERJA KERAMIK 40X40


NO Uraian Koefesien satuan harga satuan jumlah harga satuan
Keramik warna 6.63 70,000.00 464,100.00
Semen 9.8 1,630.00 15,974.00
Pasir 0.045 191,300.00 8,608.50
Semen warna 1.3 280,600.00 364,780.00
Pekerja 0.25 HOK 117,600.00 29,400.00
Tukang batu 0.125 HOK 172,600.00 21,575.00
Kepala Tukang 0.013 HOK 180,000.00 2,340.00
Mandor 0.013 HOK 152,000.00 1,976.00
TOTAL HARGA 908,753.50

MEMBUAT 1M3 KOLOM PRAKTIS


NO Uraian Koefesien satuan harga satuan jumlah harga satuan
kayu kelas III 0.002 m3 5,688,000.00 11,376.00
Paku 5cm-12cm 0.01 kg 21,300.00 213.00
Besi beton polos 3 kg 15,400.00 46,200.00
Kawat beton 0.045 kg 22,500.00 1,012.50
Semen 4 kg 1,630.00 6,520.00
Pasir 0.006 m3 191,300.00 1,147.80
Kerikil 0.009 m3 280,600.00 2,525.40
Pekerja 0.18 HOK 117,600.00 21,168.00
Tukang batu 0.02 HOK 172,600.00 3,452.00
Tukang kayu 0.02 HOK 195,000.00 3,900.00
Tukang besi 0.02 HOK 172,600.00 3,452.00
Kepala tukang 0.006 HOK 180,000.00 1,080.00
Mandor 0.009 HOK 152,000.00 1,368.00
TOTAL HARGA 103,414.70

PASANGAN BATAKO 1PC:4PB


NO Uraian Koefesien satuan harga satuan jumlah harga satuan
Bata merah 12.5 bh 3,200.00 40,000.00
Semen 24.26 kg 1,630.00 39,543.80
Pasir 0.772 m3 191,300.00 147,683.60
Pekerja 0.35 HOK 117,600.00 41,160.00
Tukang batu 0.15 HOK 172,600.00 25,890.00
Kepala tukang 0.015 HOK 180,000.00 2,700.00
Mandor 0.018 HOK 152,000.00 2,736.00
TOTAL HARGA 299,713.40

PEKERJAAN RING BALOK


NO Uraian Koefesien satuan harga satuan jumlah harga satuan
kayu kelas III 0.003 5,688,000.00 17,064.00
Paku 5cm-12cm 0.02 21,300.00 426.00
Besi beton polos 3.6 15,400.00 55,440.00
Kawat beton 0.05 22,500.00 1,125.00
Semen 5.5 1,630.00 8,965.00
Pasir 0.009 191,300.00 1,721.70
Kerikil 0.015 280,600.00 4,209.00
Pekerja 0.297 HOK 117,600.00 34,927.20
Tukang batu 0.033 HOK 172,600.00 5,695.80
Tukang kayu 0.033 HOK 195,000.00 6,435.00
Tukang besi 0.033 HOK 172,600.00 5,695.80
Kepala tukang 0.01 HOK 180,000.00 1,800.00
Mandor 0.015 HOK 152,000.00 2,280.00
TOTAL HARGA 145,784.50

1M2 PLASTERAN 1PC:3PP TEBAL 15mm


NO Uraian Koefesien satuan harga satuan jumlah harga satuan
Semen 7.776 1,630.00 12,674.88
Pasir 0.023 191,300.00 4,399.90
Pekerja 0.3 117,600.00 35,280.00
Tukang batu 0.15 172,600.00 25,890.00
Kepala tukang 0.015 180,000.00 2,700.00
Mandor 0.015 152,000.00 2,280.00
83,224.78
1630
Volum
URAIAN PEKERJAAN Satuan Sketsa
e
PEKERJAAN PONDASI
Pekerjaan galian pondasi
P = 42.5 m 23.8 m3
L = 0.7 m
T = 0.8 m

Pekerjaan urugan pasir


P = 42.5 m 1.4875 m3
L = 0.7 m
T = 0.05 m

pasangan batu kali


P = 42.5 m 19.125 m3
L = 0.6 m
T = 0.75 m

PEKERJAAN BETON BERTULANG


Sloof
P = 42.5 m 1.59375 m3
L = 0.15 m
T = 0.25 m

Kolom
P = 0.15 m 1.33875 m3
L = 0.15 m
T = 3.5 m

Ring balok
P = 42.5 m 1.275 m3
L = 0.15 m
T = 0.2 m

PEKERJAAN PASANGAN DINDING DAN PLASTERAN


Pasangan bata merah
L = 42.4 99.2796 m2
T = 3.3

plasteran
L = 42.4 198.5592
T = 3.3
PEKERJAAN ATAP
Rangka atap kayu
Atap metal
Lisplank

Pekerjaan lantai
lantai kerja
Pasangan keramik 40x40
Pasangan keramik 20x25
Pasangan keramik 20x20
6 0.15 3.5
6 0.525 1.05 lor semea
2.5 22.05
2 laporan pembukuan
2
kolom
3 21 0.15 15.3
3 3.15
3
6
3 pintu p1 2.058 1 2.058
3 pintu p2 1.638 1 1.638
1.5 pintu p3 1.638 4 6.552
1.5
Jendela 1 1.38 3 4.14
42.5 jendela 2 0.9 2 1.8

ventilasi 1 0.2244 5 1.122


ventilasi 2 0.4323 1 0.4323
ventilasi 3 0.8481 1 0.8481

18.5904
40.6404

6
6
4.5
2.5
3
2

3
3
3
6
3
3
1.5
1.5

total 48
168
127.3596
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT ANALISA SATUAN
PEKERJAAN PONDASI
Pekerjaan galian pondasi 23.8 92,000.00
Pekerjaan urugan pasir 1.4875 6,640.00
pasangan batu kali 19.125 1,144,230.50

PEKERJAAN BETON BERTULANG


Sloof 1.59375 7,112,349.00
Kolom 1.33875 103,414.70
Ring balok 1.275 145,784.50

PASANGAN DINDING DAN PLASTERAN


Pasangan batako 99 299,713.40
Plasteran dinding 198.5592 83,224.78

PEKERJAAN ATAP
Rangka atap kayu
Atap metal
Lisplank

Pekerjaan lantai
lantai kerja
Pasangan keramik 40x40
Pasangan keramik 20x25
Pasangan keramik 20x20

PEKERJAAN KOSEN PINTU DAN JENDELA


JUMLAH HARGA

2,189,600.00
9,877.00
21,883,408.31

11,335,306.22
138,446.43
185,875.24

29,755,426.47
16,525,045.74