PEKERJAAN SLOOF
NO Uraian Koefesien satuan harga satuan jumlah harga satuan
1 kayu kelas III 0.27 m3 5,688,000.00 1,535,760.00
2 Paku 2 kg 21,300.00 42,600.00
3 Minyak bekisting 0.6 liter 2,000.00 1,200.00
4 Besi beton polos 210 kg 15,400.00 3,234,000.00
5 Kawat beton 3 kg 22,500.00 67,500.00
6 Semen 336 kg 1,630.00 547,680.00
7 Pasir 0.54 m3 191,300.00 103,302.00
Kerikil 0.81 m3 280,600.00 227,286.00
Pekerja 5.6 HOK 117,600.00 658,560.00
Tukang batu 0.275 HOK 172,600.00 47,465.00
Tukang kayu 1.56 HOK 195,000.00 304,200.00
Tukang besi 1.4 HOK 172,600.00 241,640.00
Kepala tukang 0.323 HOK 180,000.00 58,140.00
Mandor 0.283 HOK 152,000.00 43,016.00
TOTAL HARGA 7,112,349.00
Kolom
P = 0.15 m 1.33875 m3
L = 0.15 m
T = 3.5 m
Ring balok
P = 42.5 m 1.275 m3
L = 0.15 m
T = 0.2 m
plasteran
L = 42.4 198.5592
T = 3.3
PEKERJAAN ATAP
Rangka atap kayu
Atap metal
Lisplank
Pekerjaan lantai
lantai kerja
Pasangan keramik 40x40
Pasangan keramik 20x25
Pasangan keramik 20x20
6 0.15 3.5
6 0.525 1.05 lor semea
2.5 22.05
2 laporan pembukuan
2
kolom
3 21 0.15 15.3
3 3.15
3
6
3 pintu p1 2.058 1 2.058
3 pintu p2 1.638 1 1.638
1.5 pintu p3 1.638 4 6.552
1.5
Jendela 1 1.38 3 4.14
42.5 jendela 2 0.9 2 1.8
18.5904
40.6404
6
6
4.5
2.5
3
2
3
3
3
6
3
3
1.5
1.5
total 48
168
127.3596
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT ANALISA SATUAN
PEKERJAAN PONDASI
Pekerjaan galian pondasi 23.8 92,000.00
Pekerjaan urugan pasir 1.4875 6,640.00
pasangan batu kali 19.125 1,144,230.50
PEKERJAAN ATAP
Rangka atap kayu
Atap metal
Lisplank
Pekerjaan lantai
lantai kerja
Pasangan keramik 40x40
Pasangan keramik 20x25
Pasangan keramik 20x20
2,189,600.00
9,877.00
21,883,408.31
11,335,306.22
138,446.43
185,875.24
29,755,426.47
16,525,045.74