REKAPITULASI

RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN JUMLAH

I PEKERJAAN PERSIAPAN #N/A

II PEKERJAAN KAYU 172,191,562.08

III PEKERJAAN PENUTUP LANTAI & DINDING 373,759,064.20

IV PEKERJAAN BETON BERTULANG 37,302,676.59

V PEKERJAAN PENUTUP LANGIT-LANGIT #N/A

VI PEKERJAAN LAIN-LAIN 248,871,542.40

VII PEKERJAAN FINSIHING 57,770,906.40

JUMLAH #N/A
PPN 10% #N/A
TOTAL #N/A
DIBULATKAN #N/A
Terbilang :
SATU MILYAR DUA RATUS ENAM PULUH SEMBILAN JUTA SEMBILAN RATUS EMPAT
PULUH TUJUH RIBU RUPIAH
RENCANA ANGGARAN BIAYA (R.A.B)

URAIAN KODE HARGA JUMLAH


NO VOL SAT
PEKERJAAN ANALISA SATUAN HARGA

I PEKERJAAN PERSIAPAN
1 Pengukuran & Pemasangan Boowplank A.004 111.00 #N/A #N/A #N/A
#N/A
II PEKERJAAN KAYU
1 Pasang daun pintu Panel, ky. Lembasung F.005 30.25 m² 554,800.00 16,782,700.00
2 Pasang daun jendela kaca patri motif F.007 65.25 m2 426,080.00 27,801,720.00
3 Pasang kaca Patri L.021 104.70 m2 1,141,355.00 119,494,161.73
4 Pasang Konsul bawah kanopi Ky. Bangkirai F.002 0.80 m3 5,095,062.50 4,085,180.35
5 Pasang plind dinding ky. Ulin M.013 120.00 M' 33,565.00 4,027,800.00
172,191,562.08
III PEKERJAAN PENUTUP LANTAI & DINDING
1 Pasang Lantai Keramik Granite 60x60 M.001 576.00 M2 619,843.75 357,030,000.00
2 Pasang Lantai Kamar mandi 20x20 M.004 16.00 M2 229,928.30 3,678,852.80
3 Pasang Keramik dinding KM/WC 20x25 M.006 32.00 M2 270,514.70 8,656,470.40
4 Pasang plint keramik dinding KM/WC 10x25 M.008 16.00 M' 179,028.75 2,864,460.00
5 Pasang batu palimanan hijau (kolom main entrance) M.012 4.00 M2 382,320.25 1,529,281.00
373,759,064.20
IV PEKERJAAN BETON BERTULANG
1 Beton 1:2:3
- Plesteran tangga 1:4 69.00 M2 61,478.40 4,242,009.60
- Tangga beton G.008 7.05 M3 1,048,591.00 7,392,566.55
2 Pembesian
- Tangga beton G.026 896.52 Kg 18,047.00 16,179,496.44
3 Bekisting + bongkar
- Tangga beton 34.5 M2 275,032.00 9,488,604.00
37,302,676.59
V PEKERJAAN PENUTUP LANGIT-LANGIT
1 Pasang Rangka Plafond Hollow 855.00 M2 #N/A #N/A
2 Pasang Plafond Kayu Bengkirai 2/20 I.007 855.00 M2 145,131.50 124,087,432.50
#N/A
VI PEKERJAAN LAIN-LAIN
1 Pasang Salib (material aluminium stainless finished Crome 1.00 Ls 10,000,000.00 10,000,000.00
2 Mimbar Utama & Mimbar kecil 2.00 Ls 25,000,000.00 50,000,000.00
3 Handrail tangga stainlisteel K.009 552.00 M' 253,859.60 140,130,499.20
4 Handrail mezanin stainlisteel K.009 192.00 M' 253,859.60 48,741,043.20
248,871,542.40
VII PEKERJAAN FINSIHING
1 Pengecatan dinding 2x 1,364.00 M2 19,161.00 26,135,604.00
2 Pengecatan kayu dengan cat kilap 3x 665.60 M2 47,529.00 31,635,302.40
57,770,906.40
JUMLAH #N/A
DINAS PEKERJAAN UMUM
KABUPATEN BULUNGAN

REKAPITULASI ANALISA SNI 2008


TAHUN ANGGARAN 2014
ZONA 1 KECAMATAN TANJUNG SELOR & KECAMATAN TANJUNG PALAS

NOMOR KODE SATUA HARGA SATUAN


NO. JENIS PEKERJAAN
ANALISA ANALISA N ( Rp )
1 2 3 4 5

A. PEKERJAAN PERSIAPAN SNI 03-2835-2002


1 A.001 1A.000 Membuat 1 m' pagar sementara dari kayu tinggi 2 meter m' 231,282.75
2 A.002 2A.000 Membuat 1 m' pagar sementara dari seng gelombang tinggi 2 meter m' 315,432.75
3 A.003 3A.000 Membuat 1 m' pagar sementara dari kawat duri tinggi 1.8 meter m' 330,552.75
4 A.004 4A.000 Mengerjakan 1 m' pengukuran dan pemasangan bouwplank m' 57,963.00
5 A.005 5A.000 Membuat 1 m² kantor sementara, dengan lantai plesteran m² 1,405,988.00
6 A.006 6A.000 Membuat 1 m² gudang semen dan alat-alat m² 901,244.50
7 A.007 7A.000 Membuat 1 m² rumah jaga konstruksi kayu m² 958,200.00
8 A.008 8A.000 Membersihkan 1 m² lapangan dan perataan m² 16,000.00
9 A.009 9A.000 Membuat 1 m² bedeng buruh m² 944,489.50
10 A.010 10A.000 Membuat 1 m² jalan sementara m² 216,376.50
11 A.011 11A.000 Membongkar 1 m³ beton bertulang m³ 646,650.00
12 A.012 12A.000 Membongkar 1 m³ dinding tembok bata merah m³ 604,650.00
13 A.013 13A.000 Mengerjakan1 m² pengukuran kembali (site) m² 30,950.00
14 A.014 14A.000 Membongkar 1 m³ dinding bata/ pas. batu kali (bongkaran dipakai kembali) m³ 282,600.00
15 A.015 15A.000 Mengupas 1 m² plesteran m² 13,000.00
16 A.016 16A.000 Membongkar 1 m² plesteran dinding/ siaran m² 13,000.00
17 A.017 17A.000 Membongkar 1 m² genteng/ sirap ( bongkaran dipakai kembali) m² 52,000.00
18 A.018 18A.000 Membongkar 1 m² genteng/ sirap (bongkaran tidak dipakai kembali) m² 10,400.00
19 A.019 19A.000 Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran dipakai kembali) m² 33,100.00
20 A.020 20A.000 Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali) m² 24,825.00
21 A.021 21A.000 Membongkar 1 m³ kuda-kuda/ gording/ balok (bongkaran dipakai kembali) m³ 1,154,000.00
22 A.022 22A.000 Membongkar 1 m³ kuda-kuda/ gording/ balok (bongkaran tidak dipakai kembali) m³ 718,000.00
23 A.023 23A.000 Membongkar 1 m² plafond (bongkaran dipakai kembali) m² 47,300.00
24 A.024 24A.000 Membongkar 1 m² plafond (bongkaran tidak dipakai kembali) m² 15,600.00

B. PEKERJAAN TANAH SNI


1 B.001 B.001 Menggali 1 m³ tanah biasa sedalam 1 meter m³ 71,000.00
2 B.002 B.002 Menggali 1 m³ tanah biasa sedalam 2 meter m³ 87,300.00
3 B.003 B.003 Menggali 1 m³ tanah biasa sedalam 3 meter m³ 103,880.00
4 B.004 B.004 Menggali 1 m³ tanah keras sedalam 1 meter m³ 94,480.00
5 B.005 B.005 Menggali 1 m³ tanah cadas sedalam 1 meter m³ 143,400.00
6 B.006 B.006 Menggali 1 m³ tanah lumpur sedalam 1 meter m³ 114,300.00
7 B.007 B.007 Mengerjakan 1 m² stripping tebing setinggi 1 meter m³ 5,200.00
8 B.008 B.008 Membuang 1 m³ tanah sejauh 30 meter m³ 31,100.00
9 B.009 B.009 Membuang 1 m³ tanah sejauh 150 meter m³ 53,440.00
10 B.010 B.010 Mengurug kembali 1 m³ galian m³ 23,666.67
11 B.011 B.011 Memadatkan 1 m³ tanah (per 20 cm) m³ 52,000.00
12 B.012 B.012 Mengurug 1 m³ pasir urug m³ 149,360.00
13 B.013 B.013 Mengurug 1 m³ sirtu padat untuk peninggian lantai bangunan m³ 171,200.00
14 B.014 B.014 Mengurug 1 m³ Tanah Timbunan m³ 105,200.00

C. PEKERJAAN PONDASI SNI 03-2836-2002


1 C.001 C.001 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 1 PP m³ 1,483,825.10
2 C.002 C.002 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 2 PP, Batu Belah 15/20 m³ 1,268,433.05
3 C.003 C.003 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 2 PP, Batu Gunung m³ 1,221,393.05
4 C.004 C.004 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 2,5 PP m³ 1,483,825.10
5 C.005 C.005 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 3 PP m³ 1,156,347.75
6 C.006 C.006 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 4 PP m³ 1,107,568.00
7 C.007 C.007 Memasang 1 m³ pondasi Batu Gunung; campuran 1 PC : 4 PP m³ 1,060,528.00
8 C.008 C.008 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 5 PP m³ 1,060,999.60
9 C.009 C.009 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 6 PP m³ 1,028,241.15
10 C.010 C.010 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 8 PP m³ 983,385.60
11 C.011 C.011 Memasang 1 m³ batu kosong (anstamping), Batu Belah 15/20 m³ 684,615.60
12 C.012 C.012 Memasang 1 m³ batu kosong (anstamping), Batu Gunung m³ 637,575.60
13 C.013 C.013 Memasang 1 m³ pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 KR dan 40 % batu m³ 3,286,686.80
14 C.014 C.014 belah
Memasang 1 m³ pondasi sumuran; diameter 100 cm m³ 1,121,700.80
15 C.015 C.015 Memasang 1 m' tiang pancang (40x40) cm, beton bertulang m' 1,169,080.70
16 C.016 C.016 Memasang 1 m' tiang pancang (35x35) cm, beton bertulang m' 915,357.97
C.0
17 C.017 C.017 Pemancangan Tiang Pancang Beton 25/25 per m' m' 133,600.00

D. PEKERJAAN DINDING SNI 03-2837-2002


1 D.001 D.001 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 1 PP m² 328,956.45
2 D.002 D.002 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 2 PP m² 289,342.00
3 D.003 D.003 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 3 PP m² 271,319.65
4 D.004 D.004 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 4 PP m² 259,885.95
5 D.005 D.005 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 5 PP m² 252,933.30
6 D.006 D.006 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 6 PP m² 248,342.30
7 D.007 D.007 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 1 PP m² 156,196.20
8 D.008 D.008 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 2 PP m² 139,360.70
9 D.009 D.009 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 3 PP m² 131,239.40
10 D.010 D.010 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 4 PP m² 126,337.45
11 D.011 D.011 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 5 PP m² 123,239.35
12 D.012 D.012 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 6 PP m² 121,192.75

Rekapitulasi Harga Satuan Pekerjaan Page 3


NOMOR KODE SATUA HARGA SATUAN
NO. JENIS PEKERJAAN
ANALISA ANALISA N ( Rp )
13 D.013 D.013 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 8 PP m² 117,987.50
14 D.014 D.014 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 8 PP m² 370,308.80
15 D.015 D.015 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 8 PP m² 365,170.25
16 D.016 D.016 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 8 PP m² 776,458.80

E. PEKERJAAN PLESTERAN SNI 03-2837-2002


1 E.001 E.001 Memasang 1 m² plesteran 1 PC : 1 PP; tebal 15 mm m² 77,481.68
2 E.002 E.002 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 15 mm m² 68,300.68
3 E.003 E.003 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 15 mm m² 64,166.77
4 E.004 E.004 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 15 mm m² 61,478.40
5 E.005 E.005 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 15 mm m² 59,070.78
6 E.006 E.006 Memasang 1 m² plesteran 1 PC : 6 PP; tebal 15 mm m² 58,480.17
7 E.007 E.007 Memasang 1 m² plesteran 1 PC : 7 PP; tebal 15 mm m² 57,713.72
8 E.008 E.008 Memasang 1 m² plesteran 1 PC : 8 PP; tebal 15 mm m² 56,947.27
9 E.009 E.009 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 20 mm m² 91,383.29
10 E.010 E.010 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 20 mm m² 73,271.41
11 E.011 E.011 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 20 mm m² 109,971.20
12 E.012 E.012 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 20 mm m² 80,010.09
13 E.013 E.013 Memasang 1 m² plesteran 1 PC : 6 PP; tebal 20 mm m² 78,513.56
14 E.014 E.014 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 25 mm m² 83,022.95
15 E.015 E.015 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 25 mm m² 72,405.25
16 E.016 E.016 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 25 mm m² 74,745.30
17 E.017 E.017 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 25 mm m² 72,049.65
18 E.018 E.018 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 30 mm m² 99,343.25
19 E.019 E.019 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 30 mm m² 91,581.85
20 E.020 E.020 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 30 mm m² 86,861.90
21 E.021 E.021 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 30 mm m² 81,377.55
22 E.022 E.022 Memasang 1 m² berapen 1 PC : 3 PP; tebal 30 mm m² 38,347.55
23 E.023 E.023 Memasang 1 m² berapen 1 PC : 5 PP; tebal 30 mm m² 35,450.78
24 E.024 E.024 Memasang 1 m² plesteran beton 1 PC : 2 PP; tebal 15 mm m² 68,674.70
25 E.025 E.025 Memasang 1 m² plesteran beton 1 PC : 3 PP; tebal 15 mm m² 64,937.55
26 E.026 E.026 Memasang 1 m' plesteran skoning 1 PC : 2 PP; lebar 10 mm m' 59,262.95
27 E.027 E.027 Memasang 1 m² plesteran ciprat 1 PC : 2 PP; lebar 10 mm m² 49,905.30
28 E.028 E.028 Memasang 1 m² finishing siar pasangan dinding bata merah (=20 m') m² 29,566.56
29 E.029 E.029 Memasang 1 m² finishing siar pasangan dinding conblock ekspose (=8 m') m² 14,142.00
30 E.030 E.030 Memasang 1 m² finishing siar pasangan batu kali adukan 1 PC : 2 PP m² 60,374.60
31 E.031 E.031 Memasang 1 m² acian m² 33,115.00
32 E.032 E.032 Memasang 1 m' Benangan sudut m' 14,114.15

F. PEKERJAAN KAYU SNI 03-3434-2002


1 F.001 F.001 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela; Kayu Lembasung/ Kapur m³ 5,374,062.50
2 F.002 F.002 #N/A m³ 5,095,062.50
3 F.003 F.003 Membuat dan memasang 1 m² pintu klamp sederhana; Kayu Lembasung/ Kapur m² 239,052.50
4 F.004 F.004 Membuat dan memasang 1 m² pintu klamp sederhana; Kayu Meranti m² 239,052.50
5 F.005 F.005 Membuat dan memasang 1 m² daun pintu panel; Kayu Lembasung/ Kapur m² 554,800.00
6 F.006 F.006 Membuat dan memasang 1 m² daun pintu panel; Kayu Meranti m² 554,800.00
7 F.007 F.007 Membuat dan memasang 1 m² pintu dan jendela kaca; Kayu Lembasung/ Kapur m² 426,080.00
8 F.008 F.008 Membuat dan memasang 1 m² pintu dan jendela kaca; Kayu Meranti m² 426,080.00
9 F.009 F.009 Membuat dan memasang 1 m² pintu dan jendela jalusi; Lembasung/ Kapur m² 599,680.00
10 F.010 F.010 Membuat dan memasang 1 m² pintu dan jendela jalusi; Kayu Meranti m² 599,680.00
11 F.011 F.011 Membuat dan memasang 1 m² daun pintu kayu lapis (plywood); rangka tertutup Kayu m² 541,599.50
12 F.012 F.012 Kapur
Membuat dan memasang 1 m² pintu plywood rangkap; rangka ekspose Kayu Kapur m² 589,321.50
13 F.013 F.013 Membuat dan memasang 1 m² jalusi kusen; Kayu Kapur/ Lembasung m² 468,647.50
14 F.014 F.014 Membuat dan memasang 1 m² jalusi kusen; Kayu Meranti m² 468,647.50
15 F.015 F.015 Membuat dan memasang 1 m² pintu teakwood rangkap; rangka ekspose Kayu Kapur m² 470,799.50
16 F.016 F.016 Membuat dan memasang 1 m² pintu teakwood rangkap lapis formika; rgk. ekspose Ky. m² 561,919.50
17 F.017 F.017 Meranti
Membuat dan memasang 1 m³ konstruksi kuda kuda konvensional; Kayu Kapur/ m³ 4,411,240.00
18 F.018 F.018 Lembasungdan memasang 1 m³ konstruksi kuda kuda konvensional; Kayu
Membuat m³ 4,411,240.00
19 F.019 F.019 Meranti
Membuat dan memasang 1 m³ konstruksi kuda kuda ekspose; Kayu Kapur/ Lembasung m³ 5,856,440.00
20 F.020 F.020 Membuat dan memasang 1 m³ konstruksi kuda kuda ekspose; Kayu Meranti m³ 5,856,440.00
21 F.021 F.021 Membuat dan memasang 1 m³ konstruksi gording; Kayu Kapur/ Lembasung m³ 3,609,350.00
22 F.022 F.022 Membuat dan memasang 1 m³ konstruksi gording; Kayu Meranti m³ 3,609,350.00
23 F.023 F.023 Membuat dan memasang 1 m² rangka atap genteng kodok; Kayu Kapur/ Lembasung m² 56,584.50
24 F.024 F.024 Membuat dan memasang 1 m² rangka atap genteng kodok; Kayu Meranti m² 56,584.50
25 F.025 F.025 Membuat dan memasang 1 m² rangka atap genteng keramik; Kayu Kapur/ Lembasung m² 60,324.50
26 F.026 F.026 Membuat dan memasang 1 m² rangka atap genteng keramik; Kayu Meranti m² 60,324.50
27 F.027 F.027 Membuat dan memasang 1 m² rangka atap genteng beton; Kayu Kapur/ Lembasung m² 160,182.50
28 F.028 F.028 Membuat dan memasang 1 m² rangka atap genteng beton; Kayu Meranti m² 160,182.50
29 F.029 F.029 Membuat dan memasang 1 m² rangka atap genteng metal; Kayu Lembasung/Kapur m² 47,687.50
30 F.030 F.030 Membuat dan memasang 1 m² rangka atap genteng metal; Kayu Meranti m² 47,687.50
31 F.031 F.031 Memasang 1 m² rangka atap sirap; Kayu Meranti m² 339,280.00
32 F.032 F.032 Memasang 1 m² rangka langit-langit (100 x 100) cm; Kayu Meranti m² 79,355.00
33 F.033 F.033 Memasang 1 m² rangka langit-langit (50 x 100) cm; Kayu Meranti m² 94,028.00
34 F.034 F.034 Memasang 1 m² rangka langit-langit (60 x 60) cm; Kayu Meranti m² 92,193.50
35 F.035 F.035 Memasang 1 m' lisplank uk. (3 x 20) cm; Kapur/ Lembasung m' 56,661.00
36 F.036 F.036 Memasang 1 m' lisplank uk. (3 x 30) cm; Kayu Kapur/Lembasung m' 56,602.50
37 F.037 F.037 Memasang 1 m' lisplank uk. 2x (3 x 20) cm; Kayu Kapur/ Lembasung m' 83,164.00
38 F.038 F.038 Memasang 1 m' lisplank uk. 2x (2 x 20) cm; Kayu Kapur/ Lembasung m' 45,681.00
39 F.039 F.039 Memasang 1 m² rangka dinding pemisah (60 x 120) cm; Kayu Meranti m² 125,577.50
40 F.040 F.040 Memasang 1 m² dinding pemisah teakwood rangkap; Kayu Kapur/ Lembasung m² 199,909.50
41 F.041 F.041 Memasang 1 m² dinding pemisah plywood rangkap; Kayu Meranti m² 296,927.50
42 F.042 F.042 Pasangan dinding kayu meranti berlidah per m2 - m² 330,680.00
43 F.043 F.043 Memasang 1 m² dinding lambriziring dari papan; Kayu Meranti m² 299,520.00

Rekapitulasi Harga Satuan Pekerjaan Page 4


NOMOR KODE SATUA HARGA SATUAN
NO. JENIS PEKERJAAN
ANALISA ANALISA N ( Rp )
44 F.044 F.044 Memasang 1 m² dinding lambriziring dari plywood ukuran (120 x 240) cm m² 74,339.50
45 F.045 F.045 Memasang 1 m' papan ruiter ukuran 3 x 30 cm; Kayu Meranti m² 50,376.50
46 F.046 F.046 Memasang 1 m' papan ruiter ukuran 2 x 20 cm; Kayu Meranti m² 39,904.50
47 F.047 F.047 Sebuah tiang pancang dicincin dan dilancipkan Ttk 40,450.00
48 F.048 F.048 Membuat pen pada tiang dan lubang pada balok pemikul tiap-tiap pasangan pen dan Ttk 73,800.00
49 F.049 F.049 lubang
Memancang tiang pada tanah lunak per m' m' 172,940.00
F.0 Untuk tanah biasa 1 1/4 x E.13 m' 216,175.00
F.0 Untuk tanah keras 1 1/2 x E.13 m' 259,410.00
50 F.050 F.050 Pasangan tongkat, sloop, gelegar dari kayu ulin per m3 - m³ 6,207,500.00
51 F.051 F.051 Pasangan gelegar kayu kapur/lembasung per m3 - m³ 4,221,650.00
52 F.052 F.052 Pasangan Lantai dari papan kayu kapur/lembasung per m2 - m² 176,640.00
53 F.053 F.053 Pasangan lantai dari papan kayu meranti per m2 - m² 176,640.00
F.0 Apabila hanya diketam salah satu sisinya saja m² 113,860.00
54 F.054 F.054 Pasangan lantai dari papan kayu ulin per m2 - m² 227,310.00
F.0 Apabila hanya diketam salah satu sisinya saja m² 164,530.00
55 F.055 F.055 1Ttk Memancang tiang pancang kayu ulin 10/10 - 2 m 1 Ttk 253,306.00
56 F.056 F.056 1Ttk Memancang tiang pancang kayu ulin 10/10 - 4 m 1 Ttk 333,672.00
57 F.057 F.057 Rangka badan/tiang jenang dari kayu kapur/lembasung per m3 - m3 6,908,330.00
58 F.058 F.058 Pasangan sunduk,kalang dari kayu ulin per m3 - m3 6,207,500.00

G. PEKERJAAN BETON RSNI-T-13-2002


1 G.001 G.001 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR, Batu Pecah m³ 1,201,178.00
2 G.002 G.002 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR, Kerikil Sungai m³ 853,468.00
3 G.003 G.003 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 6 KR m³ 1,202,517.17
4 G.004 G.004 Membuat 1 m³ beton tumbuk 1 PC : 4 PB : 6 KR m³ 1,124,635.50
5 G.005 G.005 Membuat 1 m² lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Koral Beton m² 156,019.23
6 G.006 G.006 Membuat 1 m² lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Kerikil m² 138,433.90
7 G.007 G.007 sungai
Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR, Batu Pecah m³ 1,360,331.00
8 G.008 G.008 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR, Kerikil Sungai m³ 1,048,591.00
9 G.009 G.009 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 4 KR m³ 1,325,767.50
10 G.010 G.010 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 2,5 KR m³ 1,340,260.67
11 G.011 G.011 Membuat 1 m³ beton bertulang 1 PC : 1.5 PB : 3 KR m³ 1,231,693.00
12 G.012 G.012 Membuat 1 m³ beton bertulang 1 PC : 1.5 PB : 2,5 KR m³ 1,443,830.50
13 G.013 G.013 Membuat 1 m³ beton bertulang 1 PC : 1 PB : 2 KR m³ 1,576,708.83
14 G.014 G.014 Membuat 1 m³ beton mutu f'c=7,4 Mpa (K 100); slump (12 ± 2) cm; w/c = 0,87 m³ 1,193,492.87
15 G.015 G.015 Membuat 1 m³ beton mutu f'c=9,8 Mpa (K 125); slump (12 ± 2) cm; w/c = 0,78 m³ 1,249,313.92
16 G.016 G.016 Membuat 1 m³ beton mutu f'c=12,2 Mpa (K 150); slump (12 ± 2) cm; w/c = 0,72 m³ 1,291,330.92
17 G.017 G.017 Membuat 1 m³ beton mutu f'c=7,4 Mpa (K 100); slump (3-6) cm; w/c = 0,87 m³ 1,124,088.37
18 G.018 G.018 Membuat 1 m³ beton mutu f'c=14,5 Mpa (K 175); slump (12 ± 2) cm; w/c = 0,66 m³ 1,343,189.74
19 G.019 G.019 Membuat 1 m³ beton mutu f'c=16,9 Mpa (K 200); slump (12 ± 2) cm; w/c = 0,61 m³ 1,389,240.82
20 G.020 G.020 Membuat 1 m³ beton mutu f'c=19,3 Mpa (K 225); slump (12 ± 2) cm; w/c = 0,58 m³ 1,428,900.08
21 G.021 G.021 Membuat 1 m³ beton mutu f'c=21,7 Mpa (K 250); slump (12 ± 2) cm; w/c = 0,56 m³ 1,448,298.39
22 G.022 G.022 Membuat 1 m³ beton mutu f'c=24 Mpa (K 275); slump (12 ± 2) cm; w/c = 0,53 m³ 1,481,547.10
23 G.023 G.023 Membuat 1 m³ beton mutu f'c=26,4 Mpa (K 300); slump (12 ± 2) cm; w/c = 0,52 m³ 1,491,680.94
24 G.024 G.024 Membuat 1 m³ beton mutu f'c=28,8 Mpa (K 325); slump (12 ± 2) cm; w/c = 0,49 m³ 1,583,769.42
25 G.025 G.025 Membuat 1 m³ beton mutu f'c=31,2 Mpa (K 350); slump (12 ± 2) cm; w/c = 0,48 m³ 1,597,067.96
26 G.026 G.026 Pembesian 1 kg dengan besi polos atau besi ulir kg 18,047.00
27 G.027 G.027 Memasang 10 kg jaring kawat baja /wiremesh kg 166,570.00
28 G.028 G.028 Memasang 1 m² bekisting untuk pondasi m² 155,975.00
29 G.029 G.029 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting pondasi m² 16,484.00
30 G.030 G.030 Memasang 1 m² bekisting untuk sloof m² 164,225.00
31 G.031 G.031 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting sloof m² 16,484.00
32 G.032 G.032 Memasang 1 m² bekisting untuk kolom m² 271,140.00
33 G.033 G.033 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting kolom m² 20,922.00
34 G.034 G.034 Memasang 1 m² bekisting untuk balok m² 276,090.00
35 G.035 G.035 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting balok m² 20,922.00
36 G.036 G.036 Memasang 1 m² bekisting untuk lantai m² 335,140.00
37 G.037 G.037 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting lantai m² 20,922.00
38 G.038 G.038 Memasang 1 m² bekisting untuk dinding m² 342,890.00
39 G.039 G.039 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting dinding m² 20,922.00
40 G.040 G.040 Memasang 1 m² bekisting untuk tangga m² 254,110.00
41 G.041 G.041 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting tangga m² 20,922.00
42 G.042 G.042 Memasang 1 m² jembatan untuk pengecoran beton m² 85,320.00
43 G.043 G.043 Memasang 1 m³ pondasi beton bertulang (150 kg besi + bekisting) m³ 4,867,756.00
44 G.044 G.044 Memasang 1 m³ sloof beton bertulang (200 kg besi + bekisting) m³ 5,930,251.00
45 G.045 G.045 Memasang 1 m³ kolom beton bertulang (300 kg besi + bekisting) m³ 9,192,491.00
46 G.046 G.046 Memasang 1 m³ balok beton bertulang (200 kg besi + bekisting) m³ 7,046,631.00
47 G.047 G.047 Memasang 1 m³ kolom beton bertulang (150 kg besi + bekisting) m³ 6,256,871.00
48 G.048 G.048 Memasang 1 m³ dinding beton bertulang (150 kg besi + bekisting) m³ 6,062,481.00
49 G.049 G.049 Memasang 1 m³ dinding beton bertulang (200 kg besi + bekisting) m³ 6,707,511.00
50 G.050 G.050 Memasang 1 m' kolom praktis beton bertulang (11 x 11 cm) m³ 98,154.40
51 G.051 G.051 Memasang 1 m' ring balok beton bertulang (10 x 15 cm) m³ 123,542.35

H. PEKERJAAN PENUTUP ATAP SNI 03-3436-2002


1 H.001 H.001 Memasang 1 m² rooflight fibreglass (180 x 90) cm m² 94,822.50
2 H.002 H.002 Memasang 1 m² atap genteng glazzur m² 141,410.00
3 H.003 H.003 Memasang 1 m' bubung genteng glazzur m' 109,368.80
4 H.004 H.004 Memasang 1 m² atap genteng beton m² 112,449.50
5 H.005 H.005 Memasang 1 m' nok genteng beton m' 119,417.30
6 H.006 H.006 Memasang 1 m² atap sirap m² 189,140.00
7 H.007 H.007 Memasang 1 m' nok atap sirap m' 58,701.50
8 H.008 H.008 Memasang 1 m² atap seng gelombang Bjls 30 m² 64,918.00

Rekapitulasi Harga Satuan Pekerjaan Page 5


NOMOR KODE SATUA HARGA SATUAN
NO. JENIS PEKERJAAN
ANALISA ANALISA N ( Rp )
9 H.009 H.009 Memasang 1 m² atap seng gelombang Bjls 20 m² 47,943.00
10 H.010 H.010 Memasang 1 m' atap bubungan seng Bjls 30 m' 151,679.00
11 H.011 H.011 Menutup atap dengan genteng metal surya roof per m2 m² 167,817.38
12 H.012 H.012 Menutup bubungan pada genteng metal Surya roof per m' m' 128,480.00
13 H.013 H.013 Menutup Atap dengan genteng Metal sakura roof per m2 m² 112,337.68
14 H.014 H.014 Menutup bubungan pada genteng metal Sakura roof per m' m' 128,480.00
15 H.015 H.015 Pasang aluminium foil / sisalation per 1 M2 m² 73,690.00

I. PEKERJAAN LANGIT-LANGIT SNI 03-2838-2002


1 I.001 I.001 Memasang 1 m² langit-langit lambriziring kayu, tebal 9 mm m² 184,866.50
2 I.002 I.002 Memasang 1 m² langit-langit plywood ukuran (120 x 240) cm; tbl. 9 mm m² 80,399.50
3 I.003 I.003 Memasang 1 m² langit-langit plywood ukuran (120 x 240) cm; tbl. 3 mm m² 45,337.00
4 I.004 I.004 Memasang 1 m² langit-langit plywood ukuran (60 x 120) cm; tbl. 9 mm m² 77,489.50
5 I.005 I.005 Memasang 1 m² langit-langit plywood ukuran (60 x 120) cm; tbl. 3 mm m² 42,427.00
6 I.006 I.006 Memasang 1 m² langit-langit teakwood ukuran (60 x 120) cm; tbl. 4 mm dan 6 mm m² 77,639.50
7 I.007 I.007 Memasang 1 m² langit-langit lat kayu bengkirai m² 145,131.50
8 I.008 I.008 Memasang 1 m² langit-langit lat kayu meranti m² 139,851.50
9 I.009 I.009 Memasang 1 m² Plywood 9 mm, rangka kayu meranti m² 179,759.00
10 I.010 I.010 Memasang 1 m² Plywood 3mm, rangka kayu meranti m² 143,294.00
11 I.011 I.011 Memasang 1 m² langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm m² 52,467.80
12 I.012 I.012 Memasang 1 m' list gipsum m' 45,450.00
13 I.013 I.013 Memasang 1 m' list kayu profil m' 32,286.50

J. PEKERJAAN SANITASI SNI


1 J.001 Memasang 1 buah kloset duduk bh 2,090,530.00
2 J.002 Memasang 1 buah kloset jongkok porselen bh 724,166.50
3 J.003 Memasang 1 buah kloset jongkok teraso bh 433,811.50
4 J.004 Memasang 1 buah urinoir bh 3,440,046.50
5 J.005 Memasang 1 buah wastafel bh 1,852,991.50
6 J.006 Memasang 1 buah bak mandi fibreglass volume 0,30 m³ bh 1,134,600.00
7 J.007 Memasang 1 buah bak mandi batu bata volume 0,30 m³ bh 1,689,454.13
8 J.008 Memasang 1 buah badkip fiberglass bh 693,150.00
9 J.009 Membuat 1 buah bak beton volume 1m³ bh 5,960,070.50
10 J.010 Memasang 1 buah bak kontrol pas. batu bata ukuran (30 x 30) cm tinggi 35 cm m² 631,131.49
11 J.011 Memasang 1 buah bak kontrol pas. batu bata ukuran (45 x 45) cm tinggi 60 cm m² 565,605.70
12 J.012 Memasang 1 buah bak kontrol pas. batu bata ukuran (60 x 60) cm tinggi 65 cm m² 873,930.69
13 J.013 Memasang 1 m' pipa PVC tipe AW Ø ½" m' 18,622.00
14 J.014 Memasang 1 m' pipa PVC tipe AW Ø ¾" m' 20,172.00
15 J.015 Memasang 1 m' pipa PVC tipe AW Ø 1" m' 23,775.75
16 J.016 Memasang 1 m' pipa PVC tipe AW Ø 1½" m' 34,587.00
17 J.017 Memasang 1 m' pipa PVC tipe AW Ø 2" m' 47,269.25
18 J.018 Memasang 1 m' pipa PVC tipe AW Ø 2½" m' 55,240.75
19 J.019 Memasang 1 m' pipa PVC tipe AW Ø 3" m' 78,641.50
20 J.020 Memasang 1 m' pipa PVC tipe AW Ø 4" m' 108,556.50
21 J.021 Memasang 1 buah bak cuci piring satinless steel bh 758,550.00
22 J.022 Memasang 1 buah kran Ø ¾" atau ½" Biasa bh 24,975.00
23 J.023 Memasang 1 buah kran Ø ¾" atau ½" stanlis bh 101,775.00
24 J.024 Memasang 1 buah floordrain bh 53,630.00

K. PEKERJAAN BESI DAN ALUMUNIUM Revisi SNI T-16-2002


1 K.001 K.001 Memasang 1 kg rangka atap baja kg 27,848.00
2 K.002 K.002 Memasang 1 kg Besi Profil kg 33,095.00
3 K.003 K.003 Mengerjakan 100 kg pekerjaan perakitan kg 35,168.80
4 K.004 K.004 Mengerjakan 1 cm pengelasan dengan las listrik cm 3,232.30
5 K.005 K.005 Memasang 1 m² pintu gulung (rolling door) besi m² 515,940.00
6 K.006 K.006 Memasang 1 m² pintu lipat (folding door) m² 2,559,200.00
7 K.007 K.007 Memasang 1 m² rolling door alumunium m² 1,491,105.00
8 K.008 K.008 Memasang 1 m² pintu alumunium m² 956,478.00
9 K.009 K.009 Memasang 1 m' Kusen Alumunium 4 " m' 253,859.60
10 K.010 K.010 1 M2 Pintu Kaca Rangka Alumunium SNI 7393 : 2008 m² 1,076,392.20
11 K.011 K.011 1 M2 Daun Jendela Kaca Rangka Alumunium SNI DT 90-0014-2007 m² 841,175.33
12 K.012 K.012 Memasang 1 m² terali besi m² 474,027.35
13 K.013 K.013 Memasang 1 m² kawat harmonika m² 45,739.00
14 K.014 K.014 Memasang 1 m² kawat nyamuk m² 120,064.45
15 K.015 K.015 Memasang 1 m² jendela nako & tralis m² 234,277.00
16 K.016 K.016 Memasang 1 m' talang datar seng BJLS 30 m' 160,396.50
17 K.017 K.017 Memasang 1 m' talang miring seng BJLS 30 m' 161,931.50
18 K.018 K.018 Memasang 1 m' talang ½ lingkaran Ø 10 cm, seng BJLS 30 m' 117,585.00
19 K.019 K.019 Memasang 1 m' talang ½ lingkaran Ø 10 cm, seng BJLS 20 m' 73,536.00
20 K.020 K.020 Memasang 1 m' talang U dari PVC m' 138,050.00

L. PEKERJAAN KUNCI DAN KACA


1 L.001 L.001 Memasang 1 buah kunci tanam kwalitas baik bh 291,370.00
2 L.002 L.002 Memasang 1 buah kunci tanam biasa bh 107,900.00
3 L.004 L.004 Memasang 1 buah kunci tanam kamar mandi bh 129,050.00
4 L.005 L.005 Memasang 1 buah engsel pintu bh 56,905.00
5 L.006 L.006 Memasang 1 buah engsel jendela kupu-kupu bh 35,270.00
6 L.007 L.007 Memasang 1 buah kait angin bh 39,705.00
7 L.008 L.008 Memasang 1 buah kunci selot bh 43,040.00
8 L.009 L.009 Memasang 1 buah pegangan pintu / door holder bh 396,350.00
9 L.010 L.010 Pasang door closer 1 buah bh 203,850.00
10 L.011 L.011 Pasang door stop 1 buah bh 38,970.00
11 L.012 L.012 Memasang 1 buah rel pintu dorong bh 2,378,220.00

Rekapitulasi Harga Satuan Pekerjaan Page 6


NOMOR KODE SATUA HARGA SATUAN
NO. JENIS PEKERJAAN
ANALISA ANALISA N ( Rp )
12 L.013 L.013 Memasang 1 m² kaca polos; tebal 3 mm m² 144,315.00
13 L.014 L.014 Memasang 1 m² kaca polos; tebal 5 mm m² 210,205.00
14 L.015 L.015 Memasang 1 m² kaca ryben; tebal 3 mm m² 208,775.00
15 L.016 L.016 Memasang 1 m² kaca ryben; tebal 5 mm m² 281,485.00
16 L.017 L.017 Memasang 1 m² kaca ryben; tebal 8 mm m² 207,380.25
17 L.018 L.018 Memasang 1 m² buram; tebal 3 mm m² 169,285.00
18 L.019 L.019 Memasang 1 m² buram; tebal 5 mm m² 265,865.00
19 L.020 L.020 Memasang 1 m² kaca cermin; tebal 3 mm m² 268,835.00
20 L.021 L.021 Memasang 1 m² kaca patri lokal m² 1,141,355.00

M. PEKERJAAN PENUTUP LANTAI DAN DINDING


1 M.001 M.001 Memasang 1 m² lantai keramik ukuran 60 x 60 cm m² 619,843.75
2 M.002 M.002 Memasang 1 m² lantai keramik ukuran 40 x 40 cm m² 231,357.75
3 M.003 M.003 Memasang 1 m² lantai keramik ukuran 30 x 30 cm m² 224,021.75
4 M.004 M.004 Pasang lantai keramik 20 x 20 cm per 1 M2 m² 229,928.30
M.005 M.005 Memasang 1 m² dinding keramik ukuran 20 x 20 cm m² 265,014.70
5 M.006 M.006 Memasang 1 m² dinding keramik ukuran 20 x 25 cm m² 270,514.70
M.007 M.007 Memasang 1 m² dinding porselin 11 x 11 cm m² 301,929.70
6 M.008 M.008 Memasang 1 m' plint keramik ukuran 10 x 20 cm m² 179,028.75
7 M.009 M.009 Memasang 1 m² lantai ubin granito ukuran 40 x 40 cm m² 363,467.75
8 M.010 M.010 Memasang 1 m² lantai ubin granito ukuran 40x 40 cm (motif khusus) m' 1,547,967.75
9 M.011 M.011 Memasang 1 m² lantai marmer ukuran 40 x 40 cm m² 368,057.75
10 M.012 M.012 Memasang 1 m² dinding batu alam m² 382,320.25
11 M.013 M.013 Memasang 1 m' plint kayu ukuran 2 x 10 cm m² 33,565.00
12 M.014 M.014 Memasang Koral Sikat Motif M2 m² 492,335.65

N. PEKERJAAN PENGECATAN
1 N.001 Mengikis / mengerok permukaan cat tembok lama 1 M2 m² 14,515.00
2 N.002 Mencuci bidang permukaan tembok yang pernah di cat per 1 M2 m² 14,850.00
3 N.003 Mengerok karat cat lama permukaan baja dengan cara manual per 1 m2 m² 14,850.00
4 N.004 Mendempul dan Menggosok 1 m² kayu m² 11,602.00
5 N.005 Mengecat 1 m² bidang kayu lama m² 31,330.00
6 N.006 Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup) m² 32,972.00
7 N.007 Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 3 lps cat penutup) m² 47,529.00
8 N.008 Pelaburan bidang kayu dengan teak oil per 1 M2 m² 24,654.00
9 N.009 Melabur 1 m² bidang kayu dengan politur m² 35,915.00
10 N.010 Melabur 1 m² bidang kayu dengan cat residu m² 13,200.00
11 N.011 Melabur 1 m² bidang kayu dengan vernis m² 43,631.00
12 N.012 Mengecat 1 m² bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup) m² 19,161.00
13 N.013 Mengecat 1 m² bidang tembok lama (1 lps cat dsr, 2 lps cat penutup) m² 15,098.00
14 N.014 Mengecat 1 m² bidang tembok tidak terlindung dari panas dan hujan m² 45,187.00
15 N.015 Pengecatan atap memakai cat khusus atap per m2 m² 49,213.30
16 N.016 Pemasangan wall paper per 1 m2 m² 143,950.00
17 N.017 Mengecat 1 m² permukaan baja dengan meni besi m² 30,396.00
18 N.018 Mengecat 1 m² permukaan baja dengan meni besi dan perancah m² 57,121.00

Rekapitulasi Harga Satuan Pekerjaan Page 7


DINAS PEKERJAAN UMUM
KABUPATEN BULUNGAN

ANALISA HARGA SATUAN PEKERJAAN


TAHUN ANGGARAN 2014

HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
A. PEKERJAAN PERSIAPAN
A.001 Membuat 1 m' pagar sementara dari kayu tinggi 2 meter
Bahan
Kayu Dolken / Kayu perancah 1.2500 Btg 16,000.00
Portland Cement (PC) 2.5000 kg 1,820.00
Pasir Beton (PB) 0.0050 m³ 107,150.00
Kerikil Sungai 0.0090 m³ 242,000.00
Kayu Meranti 5/7 0.0720 m³ 1,870,000.00
Paku Biasa 2" - 5" 0.0600 kg 21,650.00
Residu 0.4000 lt 11,700.00
Jumlah (1)
Tenaga
Pekerja 0.4000 OH 90,000.00
Tukang Kayu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0200 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
A.002 Membuat 1 m' pagar sementara dari seng gelombang tinggi 2 meter
Bahan
Kayu Dolken / Kayu perancah 1.2500 Btg 16,000.00
Portland Cement (PC) 2.5000 kg 1,820.00
Seng Gelombang 3" - 5" 1.2000 lbr 64,950.00
Pasir Beton (PB) 0.0050 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.0090 m³ 242,000.00
Kayu Meranti 5/7 0.0720 m³ 1,870,000.00
Paku Biasa 2" - 5" 0.0600 kg 21,650.00
Meni Kayu 0.4500 Kg 24,200.00
Jumlah (1)

Tenaga
Pekerja 0.4000 OH 90,000.00
Tukang Kayu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0200 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
A.003 Membuat 1 m' pagar sementara dari kawat duri tinggi 1.8 meter
Bahan
Kayu Dolken / Kayu perancah 1.0000 Btg 16,000.00
Portland Cement (PC) 2.0000 kg 1,820.00
Kawat Duri 25.0000 kg 10,100.00
Pasir Beton (PB) 0.0050 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.0090 m³ 242,000.00
Paku Biasa 2" - 5" 0.0600 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Kayu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0200 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
A.004 Mengerjakan 1 m' pengukuran dan pemasangan bouwplank
Bahan
Kayu Meranti 5/7 0.0120 m³ 1,870,000.00
Paku Biasa 2" - 5" 0.0200 kg 21,650.00
Kayu Papan Meranti (2 x 20 x 400) 0.0070 m³ 1,870,000.00
Jumlah (1)

Analisa Harga Satuan Pekerjaan Page 8


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
A.005 Membuat 1 m² kantor sementara, dengan lantai plesteran
Bahan
Kayu Dolken / Kayu perancah 1.2500 m' 16,000.00
Kayu Meranti 5/7 (ikat) 0.1800 m³ 1,870,000.00
Paku 0.8500 kg 21,650.00
Besi Strip 1.1000 kg 24,600.00
Semen Portland 35.0000 kg 1,820.00
Pasir Urug 0.1500 m³ 100,800.00
Pasir Beton 0.1000 m³ 107,150.00
Kerikil Sungai 0.1500 m³ 242,000.00
Bata Merah 30.0000 bh 990.00
Seng Plat Bjls 20 0.2500 lbr 15,000.00
Jendela Nako 2.0000 bh 122,100.00
Kaca Polos 3mm 0.0800 m² 113,100.00
Kunci Tanam 0.1500 bh 211,750.00
Plywood 3 mm 0.0600 lbr 60,500.00
Jumlah (1)

Pekerja 2.0000 OH 90,000.00


Tukang Batu 1.0000 OH 110,000.00
Tukang Kayu 2.0000 OH 110,000.00
Kepala Tukang 0.3000 OH 130,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

A.006 Membuat 1 m² gudang semen dan alat-alat


Bahan
Kayu Dolken / Kayu perancah 1.7000 Btg 16,000.00
Kayu Meranti 5/7 (ikat) 0.2100 m³ 1,870,000.00
Paku 0.3000 kg 21,650.00
Semen Portland 10.5000 kg 1,820.00
Pasir Beton 0.0300 m³ 107,150.00
Kerikil Sungai 0.0500 m³ 242,000.00
Seng Gelombang BJLS 30 1.5000 lbr 64,950.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Kayu 2.0000 OH 110,000.00
Kepala Tukang 0.2000 OH 130,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
A.007 Membuat 1 m² rumah jaga konstruksi kayu
Bahan
Kayu Dolken / Kayu perancah 3.0000 Btg 16,000.00
Kayu Meranti 5/7 (ikat) 0.2760 m³ 1,870,000.00
Paku 0.7000 kg 21,650.00
Seng Gelombang BJLS 30 1.5000 lbr 64,950.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Kayu 1.5000 OH 110,000.00
Kepala Tukang 0.1500 OH 130,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
A.008 Membersihkan 1 m² lapangan dan perataan
Pekerja 0.1000 OH 90,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)

Analisa Harga Satuan Pekerjaan Page 9


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
A.009 Membuat 1 m² bedeng buruh
Bahan
Kayu Dolken / Kayu perancah 1.2500 Btg 16,000.00
Kayu Meranti 5/7 (ikat) 0.1860 m³ 1,870,000.00
Paku 0.3000 kg 21,650.00
Semen Portland 18.0000 kg 1,820.00
Pasir Beton 0.0300 m³ 107,150.00
Kerikil Sungai 0.0500 m³ 242,000.00
Seng Gelombang BJLS 32 1.5000 lbr 64,950.00
Plywood 6 mm 1.3500 lbr 60,500.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Kayu 2.0000 OH 110,000.00
Kepala Tukang 0.2000 OH 130,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
A.010 Membuat 1 m² jalan sementara
Bahan
Batu Belah 15/20 0.1500 m³ 431,200.00
Batu Pecah 5/7 0.0900 m³ 595,833.33
Pasir Pasang 0.0100 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

A.011 Membongkar 1 m³ beton bertulang


Pekerja 6.6670 OH 90,000.00
Mandor 0.3330 OH 140,000.00
Jumlah
A.012 Membongkar 1 m³ dinding tembok bata merah
Pekerja 6.6670 OH 90,000.00
Mandor 0.0330 OH 140,000.00
Jumlah
A.013 Mengerjakan1 m² pengukuran kembali (site)
Pekerja 0.0200 OH 90,000.00
Tukang Kayu 0.0100 OH 110,000.00
Peralatan 0.5000 OH 56,100.00
Jumlah
A.014 Membongkar 1 m³ dinding bata/ pas. batu kali (bongkaran dipakai kembali)
Pekerja 3.0000 OH 90,000.00
Mandor 0.0900 OH 140,000.00
Jumlah
A.015 Mengupas 1 m² plesteran
Pekerja 0.1250 OH 90,000.00
Mandor 0.0125 OH 140,000.00
Jumlah
A.016 Membongkar 1 m² plesteran dinding/ siaran
Pekerja 0.1250 OH 90,000.00
Mandor 0.0125 OH 140,000.00
Jumlah
A.017 Membongkar 1 m² genteng/ sirap ( bongkaran dipakai kembali)
Pekerja 0.5000 OH 90,000.00
Mandor 0.0500 OH 140,000.00
Jumlah
A.018 Membongkar 1 m² genteng/ sirap (bongkaran tidak dipakai kembali)
Pekerja 0.1000 OH 90,000.00
Mandor 0.0100 OH 140,000.00
Jumlah
A.019 Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran dipakai kembali)
Pekerja 0.2000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0200 OH 140,000.00

Analisa Harga Satuan Pekerjaan Page 10


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Jumlah
A.020 Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali)
Pekerja 0.1500 OH 90,000.00
Tukang Kayu 0.0750 OH 110,000.00
Kepala Tukang 0.0075 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah
A.021 Membongkar 1 m³ kuda-kuda/ gording/ balok (bongkaran dipakai kembali)
Pekerja 4.0000 OH 90,000.00
Tukang Kayu 6.0000 OH 110,000.00
Kepala Tukang 0.6000 OH 130,000.00
Mandor 0.4000 OH 140,000.00
Jumlah
A.022 Membongkar 1 m³ kuda-kuda/ gording/ balok (bongkaran tidak dipakai kembali)
Pekerja 4.0000 OH 90,000.00
Tukang Kayu 3.0000 OH 110,000.00
Mandor 0.2000 OH 140,000.00
Jumlah
A.023 Membongkar 1 m² plafond (bongkaran dipakai kembali)
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.3000 OH 110,000.00
Kepala Tukang 0.0300 OH 130,000.00
Mandor 0.0100 OH 140,000.00
Jumlah
A.024 Membongkar 1 m² plafond (bongkaran tidak dipakai kembali)
Pekerja 0.1500 OH 90,000.00
Mandor 0.0150 OH 140,000.00
Jumlah

B. PEKERJAAN TANAH SNI


B.001 Menggali 1 m³ tanah biasa sedalam 1 meter
Tenaga
Pekerja 0.7500 OH 90,000.00
Mandor 0.0250 OH 140,000.00
Jumlah
B.002 Menggali 1 m³ tanah biasa sedalam 2 meter
Tenaga
Pekerja 0.9000 OH 90,000.00
Mandor 0.0450 OH 140,000.00
Jumlah
B.003 Menggali 1 m³ tanah biasa sedalam 3 meter
Tenaga
Pekerja 1.0500 OH 90,000.00
Mandor 0.0670 OH 140,000.00
Jumlah
B.004 Menggali 1 m³ tanah keras sedalam 1 meter
Tenaga
Pekerja 1.0000 OH 90,000.00
Mandor 0.0320 OH 140,000.00
Jumlah
B.005 Menggali 1 m³ tanah cadas sedalam 1 meter
Tenaga
Pekerja 1.5000 OH 90,000.00
Mandor 0.0600 OH 140,000.00
Jumlah
B.006 Menggali 1 m³ tanah lumpur sedalam 1 meter
Tenaga
Pekerja 1.2000 OH 90,000.00
Mandor 0.0450 OH 140,000.00
Jumlah
B.007 Mengerjakan 1 m² stripping tebing setinggi 1 meter
Tenaga
Pekerja 0.0500 OH 90,000.00
Mandor 0.0050 OH 140,000.00
Jumlah
B.008 Membuang 1 m³ tanah sejauh 30 meter
Tenaga
Pekerja 0.3300 OH 90,000.00

Analisa Harga Satuan Pekerjaan Page 11


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Mandor 0.0100 OH 140,000.00
Jumlah
B.009 Membuang 1 m³ tanah sejauh 150 meter
Tenaga
Pekerja 0.5160 OH 90,000.00
Mandor 0.0500 OH 140,000.00
Jumlah
B.010 Mengurug kembali 1 m³ galian
Tenaga
Pekerja 0.2500 OH 90,000.00
Mandor 0.0083 OH 140,000.00
Jumlah
B.011 Memadatkan 1 m³ tanah (per 20 cm)
Tenaga
Pekerja 0.5000 OH 90,000.00
Mandor 0.0500 OH 140,000.00
Jumlah
B.012 Mengurug 1 m³ pasir urug
Bahan
Pasir Urug 1.2000 m³ 100,800.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
B.013 Mengurug 1 m³ sirtu padat untuk peninggian lantai bangunan
Bahan
Sirtu 1.2000 m³ 121,000.00
Jumlah (1)
Tenaga
Pekerja 0.2500 OH 90,000.00
Mandor 0.0250 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

B.014 Mengurug 1 m³ Tanah Timbunan


Bahan
Tanah Timbunan 1.2000 m³ 66,000.00
Jumlah (1)
Tenaga
Pekerja 0.2500 OH 90,000.00
Mandor 0.0250 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

C. PEKERJAAN PONDASI SNI 03-2836-2002


C.001 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 1 PP
Bahan
Batu Belah 15/20 1.2000 m³ 431,200.00
Portland Cement (PC) 392.0000 kg 1,820.00
Pasir Pasang (PP) 0.3140 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.5000 OH 90,000.00
Tukang Batu 0.6000 OH 110,000.00
Kepala Tukang 0.0600 OH 130,000.00
Mandor 0.0750 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

C.002 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 2 PP, Batu Belah 15/20
Bahan
Batu Belah 15/20 1.2000 m³ 431,200.00
Portland Cement (PC) 267.0000 kg 1,820.00
Pasir Pasang (PP) 0.4270 m³ 107,150.00
Jumlah (1)
Tenaga

Analisa Harga Satuan Pekerjaan Page 12


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Pekerja 1.5000 OH 90,000.00
Tukang Batu 0.6000 OH 110,000.00
Kepala Tukang 0.0600 OH 130,000.00
Mandor 0.0750 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
C.003 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 2 PP, Batu Gunung
Bahan
Batu Gunung 1.2000 m³ 392,000.00
Portland Cement (PC) 267.0000 kg 1,820.00
Pasir Pasang (PP) 0.4270 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.5000 OH 90,000.00
Tukang Batu 0.6000 OH 110,000.00
Kepala Tukang 0.0600 OH 130,000.00
Mandor 0.0750 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
C.004 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 2,5 PP
Bahan
Batu Belah 15/20 1.2000 m³ 431,200.00
Portland Cement (PC) 392.0000 kg 1,820.00
Pasir Pasang (PP) 0.3140 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.5000 OH 90,000.00
Tukang Batu 0.6000 OH 110,000.00
Kepala Tukang 0.0600 OH 130,000.00
Mandor 0.0750 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
C.005 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 3 PP
Bahan
Batu Belah 15/20 1.2000 m³ 431,200.00
Portland Cement (PC) 202.0000 kg 1,820.00
Pasir Pasang (PP) 0.4850 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.5000 OH 90,000.00
Tukang Batu 0.6000 OH 110,000.00
Kepala Tukang 0.0600 OH 130,000.00
Mandor 0.0750 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
C.006 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 4 PP
Bahan
Batu Belah 15/20 1.2000 m³ 431,200.00
Portland Cement (PC) 163.0000 kg 1,820.00
Pasir Pasang (PP) 0.5200 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.5000 OH 90,000.00
Tukang Batu 0.7500 OH 110,000.00
Kepala Tukang 0.0750 OH 130,000.00
Mandor 0.0750 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
C.007 Memasang 1 m³ pondasi Batu Gunung; campuran 1 PC : 4 PP
Bahan
Batu Gunung 1.2000 m³ 392,000.00
Portland Cement (PC) 163.0000 kg 1,820.00
Pasir Pasang (PP) 0.5200 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.5000 OH 90,000.00
Tukang Batu 0.7500 OH 110,000.00
Kepala Tukang 0.0750 OH 130,000.00

Analisa Harga Satuan Pekerjaan Page 13


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Mandor 0.0750 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
C.008 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 5 PP
Bahan
Batu Belah 15/20 1.2000 m³ 431,200.00
Portland Cement (PC) 136.0000 kg 1,820.00
Pasir Pasang (PP) 0.5440 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.5000 OH 90,000.00
Tukang Batu 0.7500 OH 110,000.00
Kepala Tukang 0.0750 OH 130,000.00
Mandor 0.0750 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
C.009 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 6 PP
Bahan
Batu Belah 15/20 1.2000 m³ 431,200.00
Portland Cement (PC) 117.0000 kg 1,820.00
Pasir Pasang (PP) 0.5610 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.5000 OH 90,000.00
Tukang Batu 0.7500 OH 110,000.00
Kepala Tukang 0.0750 OH 130,000.00
Mandor 0.0750 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
C.010 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 8 PP
Bahan
Batu Belah 15/20 1.2000 m³ 431,200.00
Portland Cement (PC) 91.0000 kg 1,820.00
Pasir Pasang (PP) 0.5840 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.5000 OH 90,000.00
Tukang Batu 0.7500 OH 110,000.00
Kepala Tukang 0.0750 OH 130,000.00
Mandor 0.0750 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
C.011 Memasang 1 m³ batu kosong (anstamping), Batu Belah 15/20
Bahan
Batu Belah 15/20 1.2000 m³ 431,200.00
Pasir Urug 0.4320 m³ 100,800.00
Jumlah (1)
Tenaga
Pekerja 0.7800 OH 90,000.00
Tukang Batu 0.3900 OH 110,000.00
Kepala Tukang 0.0390 OH 130,000.00
Mandor 0.0390 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
C.012 Memasang 1 m³ batu kosong (anstamping), Batu Gunung
Bahan
Batu Gunung 1.2000 m³ 392,000.00
Pasir Urug 0.4320 m³ 100,800.00
Jumlah (1)
Tenaga
Pekerja 0.7800 OH 90,000.00
Tukang Batu 0.3900 OH 110,000.00
Kepala Tukang 0.0390 OH 130,000.00
Mandor 0.0390 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
C.013 Memasang 1 m³ pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 KR dan 40 % batu belah

Analisa Harga Satuan Pekerjaan Page 14


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Bahan
Batu Belah 15/20 0.4800 m³ 431,200.00
Portland Cement (PC) 194.0000 kg 1,820.00
Pasir Beton (PB) 0.3120 m³ 107,150.00
Koral (Batu pecah ) 0.4680 m³ 595,833.33
Besi Beton 126.0000 m³ 15,400.00
Kawat Beton 1.8000 m³ 22,000.00
Jumlah (1)
Tenaga
Pekerja 3.4000 OH 90,000.00
Tukang Batu 0.8500 OH 110,000.00
Kepala Tukang 0.0850 OH 130,000.00
Mandor 0.1700 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

C.014 Memasang 1 m³ pondasi sumuran; diameter 100 cm


Bahan
Batu Belah 15/20 0.4500 m³ 431,200.00
Portland Cement (PC) 194.0000 kg 1,820.00
Pasir Beton (PB) 0.3120 m³ 107,150.00
Koral (Batu pecah ukuran 5 mm - 40 mm) 0.4680 m³ 595,833.33
Jumlah (1)
Tenaga
Pekerja 2.3800 OH 90,000.00
Tukang Batu 0.3000 OH 110,000.00
Kepala Tukang 0.0300 OH 130,000.00
Mandor 0.0800 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
C.015 Memasang 1 m' tiang pancang (40x40) cm, beton bertulang
Bahan
Pasir Urug 0.0190 m³ 100,800.00
Pasir Beton (PB) 0.0940 m³ 107,150.00
Koral (Batu pecah ukuran 5 mm - 40 mm) 0.1500 m³ 595,833.33
Portland Cement (PC) 60.5000 kg 1,820.00
Besi Beton 45.0000 kg 15,400.00
Kawat Beton 0.9000 kg 22,000.00
Kayu Kaso 5/7 0.0320 m³ 1,870,000.00
Paku 0.1200 kg 21,650.00
Minyak Bekisting 0.0900 lt 10,600.00
Plamuur Tembok 0.2400 kg 8,360.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Batu 0.6700 OH 110,000.00
Kepala Tukang 0.0670 OH 130,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
C.016 Memasang 1 m' tiang pancang (35x35) cm, beton bertulang
Bahan
Pasir Urug 0.0160 m³ 100,800.00
Pasir Beton (PB) 0.0800 m³ 107,150.00
Koral (Batu pecah ukuran 5 mm - 40 mm) 0.1250 m³ 595,833.33
Portland Cement (PC) 49.0000 kg 1,820.00
Besi Beton 34.5000 kg 15,400.00
Kawat Beton 0.7000 kg 22,000.00
Kayu Kaso 5/7 0.0270 m³ 1,870,000.00
Paku 0.1200 kg 21,650.00
Minyak Bekisting 0.0900 lt 10,600.00
Plamuur Tembok 0.2000 kg 8,360.00
Jumlah (1)
Tenaga
Pekerja 0.8000 OH 90,000.00
Tukang Batu 0.5000 OH 110,000.00
Kepala Tukang 0.0500 OH 130,000.00

Analisa Harga Satuan Pekerjaan Page 15


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Mandor 0.0400 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
C.017 Pemancangan Tiang Pancang Beton 25/25 per m'
Alat
Drop Hammer 0.1300 Jam 250,000.00
Alat Bantu 1.0000 Ls 56,100.00
Jumlah (1)
Tenaga
Upah Kerja 1.0000 m' 45,000.00
Jumlah (2)
Jumlah (1) + (2)

D. PEKERJAAN DINDING SNI 03-2837-2002


D.001 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 1 PP
Bahan
Bata Merah 120.0000 buah 990.00
Portland Cement (PC) 64.0300 kg 1,820.00
Pasir Pasang (PP) 0.0590 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.6500 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0300 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
D.002 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 2 PP
Bahan
Bata Merah 120.0000 buah 990.00
Portland Cement (PC) 43.5000 kg 1,820.00
Pasir Pasang (PP) 0.0800 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.6000 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0300 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

D.003 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 3 PP
Bahan
Bata Merah 120.0000 buah 990.00
Portland Cement (PC) 32.9500 kg 1,820.00
Pasir Pasang (PP) 0.0910 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.6000 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0300 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
D.004 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 4 PP
Bahan
Bata Merah 120.0000 buah 990.00
Portland Cement (PC) 26.5500 kg 1,820.00
Pasir Pasang (PP) 0.0930 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.6000 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0300 OH 140,000.00

Analisa Harga Satuan Pekerjaan Page 16


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Jumlah (2)
Jumlah (1) + (2)
D.005 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 5 PP
Bahan
Bata Merah 120.0000 buah 990.00
Portland Cement (PC) 22.2000 kg 1,820.00
Pasir Pasang (PP) 0.1020 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.6000 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0300 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
D.006 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 6 PP
Bahan
Bata Merah 120.0000 buah 990.00
Portland Cement (PC) 18.5000 kg 1,820.00
Pasir Pasang (PP) 0.1220 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.6000 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0300 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
D.007 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 1 PP
Bahan
Bata Merah 60.0000 buah 990.00
Portland Cement (PC) 27.8000 kg 1,820.00
Pasir Pasang (PP) 0.0280 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3200 OH 90,000.00
Tukang Batu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
D.008 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 2 PP
Bahan
Bata Merah 60.0000 buah 990.00
Portland Cement (PC) 18.9500 kg 1,820.00
Pasir Pasang (PP) 0.0380 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

D.009 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 3 PP
Bahan
Bata Merah 60.0000 buah 990.00
Portland Cement (PC) 14.3700 kg 1,820.00
Pasir Pasang (PP) 0.0400 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)

Analisa Harga Satuan Pekerjaan Page 17


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Jumlah (1) + (2)
D.010 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 4 PP
Bahan
Bata Merah 60.0000 buah 990.00
Portland Cement (PC) 11.5000 kg 1,820.00
Pasir Pasang (PP) 0.0430 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
D.011 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 5 PP
Bahan
Bata Merah 60.0000 buah 990.00
Portland Cement (PC) 9.6800 kg 1,820.00
Pasir Pasang (PP) 0.0450 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
D.012 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 6 PP
Bahan
Bata Merah 60.0000 buah 990.00
Portland Cement (PC) 8.3200 kg 1,820.00
Pasir Pasang (PP) 0.0490 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
D.013 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 8 PP
Bahan
Bata Merah 60.0000 buah 990.00
Portland Cement (PC) 6.5000 kg 1,820.00
Pasir Pasang (PP) 0.0500 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
D.014 Memasang 1 m² dinding terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 3 PP
Bahan
Bata Terawang / Roster 30.0000 buah 10,000.00
Portland Cement (PC) 14.0000 kg 1,820.00
Pasir Pasang (PP) 0.0320 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

Analisa Harga Satuan Pekerjaan Page 18


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5

D.015 Memasang 1 m² dinding terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 4 PP
Bahan
Bata Terawang / Roster 30.0000 buah 10,000.00
Portland Cement (PC) 11.0000 kg 1,820.00
Pasir Pasang (PP) 0.0350 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
D.016 Memasang 1 m² dinding bata berongga ekspose uk. (5x11x24) cm; campuran spesi 1 PC : 3 PP
Bahan
Bata Terawang / Roster 70.0000 buah 10,000.00
Portland Cement (PC) 14.0000 kg 1,820.00
Pasir Pasang (PP) 0.0320 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

E. PEKERJAAN PLESTERAN SNI 03-2837-2002


E.001 Memasang 1 m² plesteran 1 PC : 1 PP; tebal 15 mm
Bahan
Portland Cement (PC) 15.5040 kg 1,820.00
Pasir Pasang (PP) 0.0160 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.002 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 15 mm
Bahan
Portland Cement (PC) 10.2240 kg 1,820.00
Pasir Pasang (PP) 0.0200 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.003 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 15 mm
Bahan
Portland Cement (PC) 7.7760 kg 1,820.00
Pasir Pasang (PP) 0.0230 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.004 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 15 mm

Analisa Harga Satuan Pekerjaan Page 19


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Bahan
Portland Cement (PC) 6.2400 kg 1,820.00
Pasir Pasang (PP) 0.0240 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.005 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 15 mm
Bahan
Portland Cement (PC) 5.1840 kg 1,820.00
Pasir Pasang (PP) 0.0260 m³ 107,150.00
Jumlah (1)

Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.006 Memasang 1 m² plesteran 1 PC : 6 PP; tebal 15 mm
Bahan
Portland Cement (PC) 4.4160 kg 1,820.00
Pasir Pasang (PP) 0.0270 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.007 Memasang 1 m² plesteran 1 PC : 7 PP; tebal 15 mm
Bahan
Portland Cement (PC) 3.9360 kg 1,820.00
Pasir Pasang (PP) 0.0280 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.008 Memasang 1 m² plesteran 1 PC : 8 PP; tebal 15 mm
Bahan
Portland Cement (PC) 3.4560 kg 1,820.00
Pasir Pasang (PP) 0.0290 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.009 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 20 mm
Bahan
Portland Cement (PC) 13.6320 kg 1,820.00
Pasir Pasang (PP) 0.0270 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.4000 OH 90,000.00

Analisa Harga Satuan Pekerjaan Page 20


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0220 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.010 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 20 mm
Bahan
Portland Cement (PC) 10.3680 kg 1,820.00
Pasir Pasang (PP) 0.0310 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.2600 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0220 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.011 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 20 mm
Bahan
Portland Cement (PC) 8.3200 kg 1,820.00
Pasir Pasang (PP) 0.0320 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.4000 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.2200 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.012 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 20 mm
Bahan
Portland Cement (PC) 6.9120 kg 1,820.00
Pasir Pasang (PP) 0.0350 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.4000 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0220 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

E.013 Memasang 1 m² plesteran 1 PC : 6 PP; tebal 20 mm


Bahan
Portland Cement (PC) 5.8880 kg 1,820.00
Pasir Pasang (PP) 0.0360 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.4000 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0220 OH 130,000.00
Mandor 0.0220 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.014 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 25 mm
Bahan
Portland Cement (PC) 15.5000 kg 1,820.00
Pasir Pasang (PP) 0.0130 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0130 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.015 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 25 mm

Analisa Harga Satuan Pekerjaan Page 21


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Bahan
Portland Cement (PC) 11.7500 kg 1,820.00
Pasir Pasang (PP) 0.0350 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0130 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.016 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 25 mm
Bahan
Portland Cement (PC) 9.4800 kg 1,820.00
Pasir Pasang (PP) 0.0380 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0130 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.017 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 25 mm
Bahan
Portland Cement (PC) 7.9400 kg 1,820.00
Pasir Pasang (PP) 0.0390 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0130 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.018 Memasang 1 m² plesteran 1 PC : 2 PP; tebal 30 mm
Bahan
Portland Cement (PC) 18.6500 kg 1,820.00
Pasir Pasang (PP) 0.0350 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3200 OH 90,000.00
Tukang Batu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

E.019 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 30 mm


Bahan
Portland Cement (PC) 14.1500 kg 1,820.00
Pasir Pasang (PP) 0.0390 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3200 OH 90,000.00
Tukang Batu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.020 Memasang 1 m² plesteran 1 PC : 4 PP; tebal 30 mm
Bahan
Portland Cement (PC) 11.3800 kg 1,820.00
Pasir Pasang (PP) 0.0420 m³ 107,150.00
Jumlah (1)
Tenaga

Analisa Harga Satuan Pekerjaan Page 22


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Pekerja 0.3200 OH 90,000.00
Tukang Batu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.021 Memasang 1 m² plesteran 1 PC : 5 PP; tebal 30 mm
Bahan
Portland Cement (PC) 8.1900 kg 1,820.00
Pasir Pasang (PP) 0.0450 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3200 OH 90,000.00
Tukang Batu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.022 Memasang 1 m² berapen 1 PC : 3 PP; tebal 30 mm
Bahan
Portland Cement (PC) 7.0700 kg 1,820.00
Pasir Pasang (PP) 0.0210 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Tukang Batu 0.0700 OH 110,000.00
Kepala Tukang 0.0070 OH 130,000.00
Mandor 0.0080 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.023 Memasang 1 m² berapen 1 PC : 5 PP; tebal 30 mm
Bahan
Portland Cement (PC) 5.1840 kg 1,820.00
Pasir Pasang (PP) 0.0260 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Tukang Batu 0.0700 OH 110,000.00
Kepala Tukang 0.0070 OH 130,000.00
Mandor 0.0080 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.024 Memasang 1 m² plesteran beton 1 PC : 2 PP; tebal 15 mm
Bahan
Portland Cement (PC) 9.3000 kg 1,820.00
Pasir Pasang (PP) 0.0180 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.2600 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0130 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.025 Memasang 1 m² plesteran beton 1 PC : 3 PP; tebal 15 mm
Bahan
Portland Cement (PC) 7.0700 kg 1,820.00
Pasir Pasang (PP) 0.0210 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.2600 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0130 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

Analisa Harga Satuan Pekerjaan Page 23


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5

E.026 Memasang 1 m' plesteran skoning 1 PC : 2 PP; lebar 10 mm


Bahan
Portland Cement (PC) 0.5000 kg 1,820.00
Pasir Pasang (PP) 0.0130 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.0800 OH 90,000.00
Tukang Batu 0.4000 OH 110,000.00
Kepala Tukang 0.0400 OH 130,000.00
Mandor 0.0040 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.027 Memasang 1 m² plesteran ciprat 1 PC : 2 PP; lebar 10 mm
Bahan
Portland Cement (PC) 4.3200 kg 1,820.00
Pasir Pasang (PP) 0.0060 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.028 Memasang 1 m² finishing siar pasangan dinding bata merah (=20 m')
Bahan
Portland Cement (PC) 3.1080 kg 1,820.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Tukang Batu 0.0750 OH 110,000.00
Kepala Tukang 0.0080 OH 130,000.00
Mandor 0.0080 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.029 Memasang 1 m² finishing siar pasangan dinding conblock ekspose (=8 m')
Bahan
Portland Cement (PC) 1.6000 kg 1,820.00
Jumlah (1)
Tenaga
Pekerja 0.0700 OH 90,000.00
Tukang Batu 0.0350 OH 110,000.00
Kepala Tukang 0.0040 OH 130,000.00
Mandor 0.0040 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.030 Memasang 1 m² finishing siar pasangan batu kali adukan 1 PC : 2 PP
Bahan
Portland Cement (PC) 6.3400 kg 1,820.00
Pasir Pasang (PP) 0.0120 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Batu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.031 Memasang 1 m² acian
Bahan
Portland Cement (PC) 3.2500 kg 1,820.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Tukang Batu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00

Analisa Harga Satuan Pekerjaan Page 24


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E.032 Memasang 1 m' Benangan sudut
Bahan
Portland Cement (PC) 0.0040 Zak 72,800.00
Pasir Pasang (PP) 0.0130 m3 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.0300 OH 90,000.00
Tukang Batu 0.0700 OH 110,000.00
Kepala Tukang 0.0070 OH 130,000.00
Mandor 0.0080 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

F. PEKERJAAN KAYU SNI 03-3434-2002


F.001 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela; Kayu Lembasung/ Kapur
Bahan
Balok Lembasung/ Kapur 1.1000 m³ 1,870,000.00
Paku 10 cm 1.2500 kg 21,650.00
Lem Kayu 1.0000 kg 28,000.00
Jumlah (1)
Tenaga
Pekerja 7.0000 OH 90,000.00
Tukang Kayu 21.0000 OH 110,000.00
Kepala Tukang 2.1000 OH 130,000.00
Mandor 0.3500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.002 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela; Kayu Kayu Meranti
Bahan
Balok Kayu Meranti / Kayu Kelas II 1.2000 m³ 1,870,000.00
Paku 10 cm 1.2500 kg 21,650.00
Lem Kayu 1.0000 kg 28,000.00
Jumlah (1)
Tenaga
Pekerja 6.0000 OH 90,000.00
Tukang Kayu 18.0000 OH 110,000.00
Kepala Tukang 1.8000 OH 130,000.00
Mandor 0.3000 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.003 Membuat dan memasang 1 m² pintu klamp sederhana; Kayu Lembasung/ Kapur
Bahan
Papan Kayu Lembasung/ kapur 0.0400 m³ 1,870,000.00
Paku 5 cm - 7 cm 0.0500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.3500 OH 90,000.00
Tukang Kayu 1.0500 OH 110,000.00
Kepala Tukang 0.1050 OH 130,000.00
Mandor 0.0180 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.004 Membuat dan memasang 1 m² pintu klamp sederhana; Kayu Meranti
Bahan
Papan Kayu Meranti 0.0400 m³ 1,870,000.00
Paku 5 cm - 7 cm 0.0500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.3500 OH 90,000.00
Tukang Kayu 1.0500 OH 110,000.00
Kepala Tukang 0.1050 OH 130,000.00
Mandor 0.0180 OH 140,000.00
Jumlah (2)

Analisa Harga Satuan Pekerjaan Page 25


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Jumlah (1) + (2)
F.005 Membuat dan memasang 1 m² daun pintu panel; Kayu Lembasung/ Kapur
Bahan
Papan Kayu Lembasung/ kapur 0.0400 m³ 1,870,000.00
Lem Kayu 0.5000 kg 28,000.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Kayu 3.0000 OH 110,000.00
Kepala Tukang 0.3000 OH 130,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.006 Membuat dan memasang 1 m² daun pintu panel; Kayu Meranti
Bahan
Papan Kayu Meranti 0.0400 m³ 1,870,000.00
Lem Kayu 0.5000 kg 28,000.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Kayu 3.0000 OH 110,000.00
Kepala Tukang 0.3000 OH 130,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.007 Membuat dan memasang 1 m² pintu dan jendela kaca; Kayu Lembasung/ Kapur
Bahan
Papan Kayu Lembasung/ Kapur 0.0240 m³ 1,870,000.00
Lem Kayu 0.3000 kg 28,000.00
Jumlah (1)
Tenaga
Pekerja 0.8000 OH 90,000.00
Tukang Kayu 2.4000 OH 110,000.00
Kepala Tukang 0.2400 OH 130,000.00
Mandor 0.0400 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.008 Membuat dan memasang 1 m² pintu dan jendela kaca; Kayu Meranti
Bahan
Papan Kayu Meranti 0.0240 m³ 1,870,000.00
Lem Kayu 0.3000 kg 28,000.00
Jumlah (1)
Tenaga
Pekerja 0.8000 OH 90,000.00
Tukang Kayu 2.4000 OH 110,000.00
Kepala Tukang 0.2400 OH 130,000.00
Mandor 0.0400 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.009 Membuat dan memasang 1 m² pintu dan jendela jalusi; Lembasung/ Kapur
Bahan
Papan Kayu Lembasung/ Kapur 0.0640 m³ 1,870,000.00
Lem Kayu 0.5000 kg 28,000.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Kayu 3.0000 OH 110,000.00
Kepala Tukang 0.3000 OH 130,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.010 Membuat dan memasang 1 m² pintu dan jendela jalusi; Kayu Meranti
Bahan
Papan Kayu Meranti 0.0640 m³ 1,870,000.00
Lem Kayu 0.5000 kg 28,000.00
Jumlah (1)
Tenaga

Analisa Harga Satuan Pekerjaan Page 26


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Pekerja 1.0000 OH 90,000.00
Tukang Kayu 3.0000 OH 110,000.00
Kepala Tukang 0.3000 OH 130,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.011 Membuat dan memasang 1 m² daun pintu kayu lapis (plywood); rangka tertutup Kayu Kapur
Bahan
Papan Kayu Kapur 0.0250 m³ 1,870,000.00
Paku 1 cm - 2,5 cm 0.0300 kg 21,650.00
Lem Kayu 0.5000 kg 28,000.00
Plywood tbl. 9 mm; uk. (90 x 220) cm 1.0000 lembar 154,000.00
Jumlah (1)
Tenaga
Pekerja 0.7000 OH 90,000.00
Tukang Kayu 2.1000 OH 110,000.00
Kepala Tukang 0.2100 OH 130,000.00
Mandor 0.0350 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.012 Membuat dan memasang 1 m² pintu plywood rangkap; rangka ekspose Kayu Kapur
Bahan
Papan Kayu Kapur 0.0256 m³ 1,870,000.00
Paku 1 cm - 2,5 cm 0.0300 kg 21,650.00
Lem Kayu 0.5000 kg 28,000.00
Plywood tbl. 9 mm; uk. (90 x 220) cm 1.0000 lembar 154,000.00
Jumlah (1)
Tenaga
Pekerja 0.8000 OH 90,000.00
Tukang Kayu 2.4000 OH 110,000.00
Kepala Tukang 0.2400 OH 130,000.00
Mandor 0.0400 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.013 Membuat dan memasang 1 m² jalusi kusen; Kayu Kapur/ Lembasung
Bahan
Papan Kayu Kapur/ Lembasung 0.0600 m³ 1,870,000.00
Paku 1 cm - 2,5 cm 0.1500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.6700 OH 90,000.00
Tukang Kayu 2.0000 OH 110,000.00
Kepala Tukang 0.2000 OH 130,000.00
Mandor 0.3350 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.014 Membuat dan memasang 1 m² jalusi kusen; Kayu Meranti
Bahan
Papan Kayu Meranti 0.0600 m³ 1,870,000.00
Paku 1 cm - 2,5 cm 0.1500 kg 21,650.00
Jumlah (1)

Tenaga
Pekerja 0.6700 OH 90,000.00
Tukang Kayu 2.0000 OH 110,000.00
Kepala Tukang 0.2000 OH 130,000.00
Mandor 0.3350 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.015 Membuat dan memasang 1 m² pintu teakwood rangkap; rangka ekspose Kayu Kapur
Bahan
Papan Kayu Kapur 0.0250 m³ 1,870,000.00
Paku 1 cm - 2,5 cm 0.0300 kg 21,650.00
Lem Kayu 0.3000 kg 28,000.00
Teakwood tbl. 4 mm; uk. (90 x 220) cm 1.0000 lembar 68,200.00
Jumlah (1)
Tenaga

Analisa Harga Satuan Pekerjaan Page 27


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Pekerja 0.8000 OH 90,000.00
Tukang Kayu 2.4000 OH 110,000.00
Kepala Tukang 0.0400 OH 130,000.00
Mandor 0.0400 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.016 Membuat dan memasang 1 m² pintu teakwood rangkap lapis formika; rgk. ekspose Ky. Meranti
Bahan
Papan Kayu Meranti 0.0250 m³ 1,870,000.00
Paku 1 cm - 2,5 cm 0.0300 kg 21,650.00
Lem Kayu 0.8000 kg 28,000.00
Teakwood tbl. 4 mm; uk. (90 x 220) cm 1.0000 lembar 68,200.00
Formika 0.5000 lembar 55,500.00
Jumlah (1)
Tenaga
Pekerja 0.8500 OH 90,000.00
Tukang Kayu 2.5500 OH 110,000.00
Kepala Tukang 0.2550 OH 130,000.00
Mandor 0.0430 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.017 Membuat dan memasang 1 m³ konstruksi kuda kuda konvensional; Kayu Kapur/ Lembasung
Bahan
Balok Kayu Kapur/ Lembasung 1.1000 m³ 1,870,000.00
Besi Strip 5 mm 15.0000 kg 24,600.00
Paku 12 cm 5.6000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 4.0000 OH 90,000.00
Tukang Kayu 12.0000 OH 110,000.00
Kepala Tukang 1.2000 OH 130,000.00
Mandor 0.2000 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.018 Membuat dan memasang 1 m³ konstruksi kuda kuda konvensional; Kayu Meranti
Bahan
Balok Kayu Meranti 1.1000 m³ 1,870,000.00
Besi Strip 5 mm 15.0000 kg 24,600.00
Paku 12 cm 5.6000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 4.0000 OH 90,000.00
Tukang Kayu 12.0000 OH 110,000.00
Kepala Tukang 1.2000 OH 130,000.00
Mandor 0.2000 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.019 Membuat dan memasang 1 m³ konstruksi kuda kuda ekspose; Kayu Kapur/ Lembasung
Bahan
Balok Kayu Kapur/ Lembasung 1.2000 m³ 1,870,000.00
Besi Strip 5 mm 15.0000 kg 24,600.00
Paku 12 cm 5.6000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 6.7000 OH 90,000.00
Tukang Kayu 20.1000 OH 110,000.00
Kepala Tukang 2.0100 OH 130,000.00
Mandor 0.3350 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

F.020 Membuat dan memasang 1 m³ konstruksi kuda kuda ekspose; Kayu Meranti
Bahan
Balok Kayu Meranti 1.2000 m³ 1,870,000.00
Besi Strip 5 mm 15.0000 kg 24,600.00
Paku 12 cm 5.6000 kg 21,650.00
Jumlah (1)

Analisa Harga Satuan Pekerjaan Page 28


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Tenaga
Pekerja 6.7000 OH 90,000.00
Tukang Kayu 20.1000 OH 110,000.00
Kepala Tukang 2.0100 OH 130,000.00
Mandor 0.3350 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.021 Membuat dan memasang 1 m³ konstruksi gording; Kayu Kapur/ Lembasung
Bahan
Balok Kayu Kapur/ Lembasung 1.1000 m³ 1,870,000.00
Besi Strip 5 mm 15.0000 kg 24,600.00
Paku 12 cm 3.0000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 2.4000 OH 90,000.00
Tukang Kayu 7.2000 OH 110,000.00
Kepala Tukang 0.7200 OH 130,000.00
Mandor 0.1200 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.022 Membuat dan memasang 1 m³ konstruksi gording; Kayu Meranti
Bahan
Balok Kayu Meranti 1.1000 m³ 1,870,000.00
Besi Strip 5 mm 15.0000 kg 24,600.00
Paku 12 cm 3.0000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 2.4000 OH 90,000.00
Tukang Kayu 7.2000 OH 110,000.00
Kepala Tukang 0.7200 OH 130,000.00
Mandor 0.1200 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.023 Membuat dan memasang 1 m² rangka atap genteng kodok; Kayu Kapur/ Lembasung
Bahan
Kaso-kaso (5 x 7) cm 0.0120 m³ 1,870,000.00
Reng (2 x 3) cm 0.0036 m³ 1,870,000.00
Paku 5 cm & 10 cm 0.2500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.024 Membuat dan memasang 1 m² rangka atap genteng kodok; Kayu Meranti
Bahan
Kaso-kaso (5 x 7) cm 0.0120 m³ 1,870,000.00
Reng (2 x 3) cm 0.0036 m³ 1,870,000.00
Paku 5 cm & 10 cm 0.2500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.025 Membuat dan memasang 1 m² rangka atap genteng keramik; Kayu Kapur/ Lembasung
Bahan
Kaso-kaso (5 x 7) cm 0.0140 m³ 1,870,000.00
Reng (2 x 3) cm 0.0036 m³ 1,870,000.00
Paku 5 cm & 10 cm 0.2500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00

Analisa Harga Satuan Pekerjaan Page 29


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.026 Membuat dan memasang 1 m² rangka atap genteng keramik; Kayu Meranti
Bahan
Kaso-kaso (5 x 7) cm 0.0140 m³ 1,870,000.00
Reng (2 x 3) cm 0.0036 m³ 1,870,000.00
Paku 5 cm & 10 cm 0.2500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.027 Membuat dan memasang 1 m² rangka atap genteng beton; Kayu Kapur/ Lembasung
Bahan
Kaso-kaso (5 x 7) cm 0.0140 m³ 1,870,000.00
Reng (3 x 4) cm 0.0570 m³ 1,870,000.00
Paku 5 cm & 10 cm 0.2500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.028 Membuat dan memasang 1 m² rangka atap genteng beton; Kayu Meranti
Bahan
Kaso-kaso (5 x 7) cm 0.0140 m³ 1,870,000.00
Reng (3 x 4) cm 0.0570 m³ 1,870,000.00
Paku 5 cm & 10 cm 0.2500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.029 Membuat dan memasang 1 m² rangka atap genteng metal; Kayu Lembasung/Kapur
Bahan
Kayu Kapur 0.0120 m³ 1,870,000.00
Paku 5 cm & 10 cm 0.1500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.030 Membuat dan memasang 1 m² rangka atap genteng metal; Kayu Meranti
Bahan
Kayu Meranti 0.0120 m³ 1,870,000.00
Paku 5 cm & 10 cm 0.1500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)

Analisa Harga Satuan Pekerjaan Page 30


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Jumlah (1) + (2)

F.031 Memasang 1 m² rangka atap sirap; Kayu Meranti


Bahan
Kayu Meranti 0.1650 m³ 1,870,000.00
Paku 5 cm & 10 cm 0.2000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1200 OH 90,000.00
Tukang Kayu 0.1200 OH 110,000.00
Kepala Tukang 0.0120 OH 130,000.00
Mandor 0.0060 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.032 Memasang 1 m² rangka langit-langit (100 x 100) cm; Kayu Meranti
Bahan
Kaso-kaso (5 x 7) cm 0.0120 m³ 1,870,000.00
Paku 7 cm - 10 cm 0.1000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Tukang Kayu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0750 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

F.033 Memasang 1 m² rangka langit-langit (50 x 100) cm; Kayu Meranti


Bahan
Kaso-kaso (5 x 7) cm 0.0154 m³ 1,870,000.00
Paku 7 cm - 10 cm 0.2000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Tukang Kayu 0.3000 OH 110,000.00
Kepala Tukang 0.0300 OH 130,000.00
Mandor 0.0750 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

F.034 Memasang 1 m² rangka langit-langit (60 x 60) cm; Kayu Meranti


Bahan
Kaso-kaso (5 x 7) cm 0.0163 m³ 1,870,000.00
Paku 7 cm - 10 cm 0.2500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 90,000.00
Tukang Kayu 0.3000 OH 110,000.00
Kepala Tukang 0.0300 OH 130,000.00
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.035 Memasang 1 m' lisplank uk. (3 x 20) cm; Kapur/ Lembasung
Bahan
Papan Kayu Kapur/ Lembasung 0.0108 m³ 1,870,000.00
Paku 5 cm - 7 cm 0.1000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.036 Memasang 1 m' lisplank uk. (3 x 30) cm; Kayu Kapur/Lembasung
Bahan

Analisa Harga Satuan Pekerjaan Page 31


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Papan Kayu Lembasung 0.0110 m³ 1,870,000.00
Paku 5 cm - 7 cm 0.0500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.2000 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.037 Memasang 1 m' lisplank uk. 2x (3 x 20) cm; Kayu Kapur/ Lembasung
Bahan
Papan Kayu Kapur/ Lembasung 0.0145 m³ 1,870,000.00
Paku 5 cm - 7 cm 0.0600 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1500 Oh 90,000.00
Tukang Kayu 0.2500 Oh 110,000.00
Kepala Tukang 0.0250 Oh 130,000.00
Mandor 0.0750 Oh 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.038 Memasang 1 m' lisplank uk. 2x (2 x 20) cm; Kayu Kapur/ Lembasung
Bahan
Papan Kayu Kapur/ Lembasung 0.0086 m³ 1,870,000.00
Paku 5 cm - 7 cm 0.0600 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1000 Oh 90,000.00
Tukang Kayu 0.1000 Oh 110,000.00
Kepala Tukang 0.0100 Oh 130,000.00
Mandor 0.0500 Oh 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.039 Memasang 1 m² rangka dinding pemisah (60 x 120) cm; Kayu Meranti
Bahan
Balok Kayu Meranti 0.0280 m³ 1,870,000.00
Paku 5 cm - 7 cm 0.1500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Tukang Kayu 0.4500 OH 110,000.00
Kepala Tukang 0.0450 OH 130,000.00
Mandor 0.0080 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.040 Memasang 1 m² dinding pemisah teakwood rangkap; Kayu Kapur/ Lembasung
Bahan
Balok Kayu Kapur/ Lembasung 0.0280 m³ 1,870,000.00
Paku 5 cm - 10 cm 0.1500 kg 21,650.00
Teakwood tbl. 4 mm; uk. (120 x 240) cm 0.8600 lembar 68,200.00
Lem Kayu 0.5600 kg 28,000.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Tukang Kayu 0.4500 OH 110,000.00
Kepala Tukang 0.0450 OH 130,000.00
Mandor 0.0080 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.041 Memasang 1 m² dinding pemisah plywood rangkap; Kayu Meranti
Bahan
Balok Kayu Meranti 0.0280 m³ 1,870,000.00
Paku 5 cm - 10 cm 0.1500 kg 21,650.00
Plywood tbl. 9 mm; uk. (120 x 240) cm 0.8600 lembar 154,000.00
Lem Kayu 0.5600 kg 28,000.00
Jumlah (1)

Analisa Harga Satuan Pekerjaan Page 32


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Tenaga
Pekerja 0.2000 OH 90,000.00
Tukang Kayu 0.6000 OH 110,000.00
Kepala Tukang 0.0600 OH 130,000.00
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.042 Pasangan dinding kayu meranti berlidah per m2 -
Bahan
Papan kayu meranti 0.0250 M3 1,870,000.00
Paku 0.2000 Kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.6000 OH 90,000.00
Tukang Kayu 1.8000 OH 110,000.00
Kepala Tukang 0.1800 OH 130,000.00
Mandor 0.0300 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.043 Memasang 1 m² dinding lambriziring dari papan; Kayu Meranti
Bahan
Papan Kayu Meranti 0.0070 m³ 1,870,000.00
Paku 5 cm - 10 cm 0.1000 kg 21,650.00
Paku Skrup 10 cm/ Besi 0.1500 kg 31,100.00
Jumlah (1)
Tenaga
Pekerja 0.6000 OH 90,000.00
Tukang Kayu 1.8000 OH 110,000.00
Kepala Tukang 0.1800 OH 130,000.00
Mandor 0.0300 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.044 Memasang 1 m² dinding lambriziring dari plywood ukuran (120 x 240) cm
Bahan
Plywood tbl. 9 mm; uk. (120 x 240) cm 0.4000 lembar 154,000.00
Paku 5 cm - 10 cm 0.0500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.0250 OH 90,000.00
Tukang Kayu 0.0750 OH 110,000.00
Kepala Tukang 0.0075 OH 130,000.00
Mandor 0.0013 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.045 Memasang 1 m' papan ruiter ukuran 3 x 30 cm; Kayu Meranti
Bahan
Papan Kayu Meranti (2 x 25 x 400) 0.0100 m³ 1,870,000.00
Paku 5 cm - 10 cm 0.0100 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.0700 OH 90,000.00
Tukang Kayu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0040 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.046 Memasang 1 m' papan ruiter ukuran 2 x 20 cm; Kayu Meranti
Bahan
Papan Kayu Meranti (2 x 20 x 400) 0.0044 m³ 1,870,000.00
Paku 5 cm - 10 cm 0.0100 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.0700 OH 90,000.00
Tukang Kayu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0040 OH 140,000.00
Jumlah (2)

Analisa Harga Satuan Pekerjaan Page 33


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Jumlah (1) + (2)
F.047 Sebuah tiang pancang dicincin dan dilancipkan
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah
Jumlah (1) + (2)

F.048 Membuat pen pada tiang dan lubang pada balok pemikul tiap-tiap pasangan pen dan lubang
Tenaga
Tukang Kayu 0.6000 OH 110,000.00
Kepala Tukang 0.0600 OH 130,000.00
Jumlah
Jumlah (1) + (2)
F.049 Memancang tiang pada tanah lunak per m'
Tenaga
Pekerja 1.8000 OH 90,000.00
Tukang Kayu 0.0400 OH 110,000.00
Kepala Tukang 0.0040 OH 130,000.00
Mandor 0.0430 OH 140,000.00
Jumlah
Jumlah (1) + (2)
Untuk tanah biasa 1 1/4 x E.13
Untuk tanah keras 1 1/2 x E.13
F.050 Pasangan tongkat, sloop, gelegar dari kayu ulin per m3 -
Bahan
Balok kayu ulin 1.0000 m³ 3,850,000.00
Paku ulin 1.0000 kg 27,500.00
Jumlah (1)
Tenaga
Pekerja 5.0000 OH 90,000.00
Tukang Kayu 15.0000 OH 110,000.00
Kepala Tukang 1.5000 OH 130,000.00
Mandor 0.2500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.051 Pasangan gelegar kayu kapur/lembasung per m3 -
Bahan
Balok Kayu Kapur/ Lembasung 1.0000 m³ 1,870,000.00
Paku 1.0000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 5.0000 OH 90,000.00
Tukang Kayu 15.0000 OH 110,000.00
Kepala Tukang 1.5000 OH 130,000.00
Mandor 0.2500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.052 Pasangan Lantai dari papan kayu kapur/lembasung per m2 -
Bahan
Papan kayu kapur/lembasung 0.0250 m³ 1,870,000.00
Paku 0.2000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.2800 OH 90,000.00
Tukang Kayu 0.8000 OH 110,000.00
Kepala Tukang 0.0800 OH 130,000.00
Mandor 0.0140 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.053 Pasangan lantai dari papan kayu meranti per m2 -
Bahan
Papan kayu meranti 0.0250 m³ 1,870,000.00

Analisa Harga Satuan Pekerjaan Page 34


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Paku 0.2000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.2800 OH 90,000.00
Tukang Kayu 0.8000 OH 110,000.00
Kepala Tukang 0.0800 OH 130,000.00
Mandor 0.0140 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
Apabila hanya diketam salah satu sisinya saja 62,780.00
F.054 Pasangan lantai dari papan kayu ulin per m2 -
Bahan
Papan kayu ulin 0.0250 m³ 3,850,000.00
Paku ulin 0.2000 kg 27,500.00
Jumlah (1)
Tenaga
Pekerja 0.2800 OH 90,000.00
Tukang Kayu 0.8000 OH 110,000.00
Kepala Tukang 0.0800 OH 130,000.00
Mandor 0.0140 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
Apabila hanya diketam salah satu sisinya saja 62,780.00
F.055 1Ttk Memancang tiang pancang kayu ulin 10/10 - 2 m
Bahan
Kayu ulin 10/10 - 2 m 0.0200 m³ 3,850,000.00
Jumlah (1)
Tenaga
Pekerja 1.8000 OH 90,000.00
Tukang Kayu 0.0400 OH 110,000.00
Kepala Tukang 0.0040 OH 130,000.00
Mandor 0.0430 OH 140,000.00
Alat Bantu 0.0600 56,100.00
Jumlah (2)
Jumlah (1) + (2)
F.056 1Ttk Memancang tiang pancang kayu ulin 10/10 - 4 m
Bahan
Kayu ulin 10/10 - 4 m 0.0400 m³ 3,850,000.00
Jumlah (1)
Tenaga
Pekerja 1.8000 OH 90,000.00
Tukang Kayu 0.0400 OH 110,000.00
Kepala Tukang 0.0040 OH 130,000.00
Mandor 0.0430 OH 140,000.00
Alat Bantu 0.1200 56,100.00
Jumlah (2)
Jumlah (1) + (2)
F.057 Rangka badan/tiang jenang dari kayu kapur/lembasung per m3 -
Bahan
kayu kapur/lembasung 1.2000 m³ 1,870,000.00
Paku 0.2000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 10.0000 OH 90,000.00
Tukang Kayu 30.0000 OH 110,000.00
Kepala Tukang 3.0000 OH 130,000.00
Mandor 0.5000 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.058 Pasangan sunduk,kalang dari kayu ulin per m3 -
Bahan
Balok kayu ulin 1.0000 m³ 3,850,000.00
Paku ulin 1.0000 kg 27,500.00
Jumlah (1)
Tenaga
Pekerja 5.0000 OH 90,000.00
Tukang Kayu 15.0000 OH 110,000.00
Kepala Tukang 1.5000 OH 130,000.00

Analisa Harga Satuan Pekerjaan Page 35


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Mandor 0.2500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

G. PEKERJAAN BETON RSNI-T-13-2002


G.001 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR, Batu Pecah
Bahan
Portland Cement (PC) 218.0000 kg 1,820.00
Pasir Beton (PB) 0.5200 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.8700 m³ 641,666.67
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0800 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.002 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR, Kerikil Sungai
Bahan
Portland Cement (PC) 218.0000 kg 1,820.00
Pasir Beton (PB) 0.5200 m³ 107,150.00
Kerikil Sungai 0.8700 m³ 242,000.00
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0800 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.003 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 6 KR
Bahan
Portland Cement (PC) 197.0000 kg 1,820.00
Pasir Beton (PB) 0.4700 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.9400 m³ 641,666.67
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0800 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.004 Membuat 1 m³ beton tumbuk 1 PC : 4 PB : 6 KR
Bahan
Portland Cement (PC) 173.0000 kg 1,820.00
Pasir Beton (PB) 0.5700 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.8700 m³ 641,666.67
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0800 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.005 Membuat 1 m² lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Koral Beton
Bahan
Portland Cement (PC) 10.0000 kg 1,820.00
Pasir Beton (PB) 0.0260 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.0440 m³ 641,666.67
Jumlah (1)
Tenaga
Pekerja 1.1500 OH 90,000.00
Tukang Batu 0.0200 OH 110,000.00

Analisa Harga Satuan Pekerjaan Page 36


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Kepala Tukang 0.0020 OH 130,000.00
Mandor 0.0060 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.006 Membuat 1 m² lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Kerikil sungai
Bahan
Portland Cement (PC) 10.0000 kg 1,820.00
Pasir Beton (PB) 0.0260 m³ 107,150.00
Kerikil sungai 0.0440 m³ 242,000.00
Jumlah (1)
Tenaga
Pekerja 1.1500 OH 90,000.00
Tukang Batu 0.0200 OH 110,000.00
Kepala Tukang 0.0020 OH 130,000.00
Mandor 0.0060 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.007 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR, Batu Pecah
Bahan
Portland Cement (PC) 336.0000 kg 1,820.00
Pasir Beton (PB) 0.5400 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.7800 m³ 641,666.67
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0800 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.008 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR, Kerikil Sungai
Bahan
Portland Cement (PC) 336.0000 kg 1,820.00
Pasir Beton (PB) 0.5400 m³ 107,150.00
Kerikil Sungai 0.7800 m³ 242,000.00
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0800 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.009 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 4 KR
Bahan
Portland Cement (PC) 280.0000 kg 1,820.00
Pasir Beton (PB) 0.4500 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.9000 m³ 641,666.67
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0800 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.010 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 2,5 KR
Bahan
Portland Cement (PC) 352.0000 kg 1,820.00
Pasir Beton (PB) 0.5600 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.7000 m³ 641,666.67
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0800 OH 140,000.00

Analisa Harga Satuan Pekerjaan Page 37


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Jumlah (2)
Jumlah (1) + (2)

G.011 Membuat 1 m³ beton bertulang 1 PC : 1.5 PB : 3 KR


Bahan
Portland Cement (PC) 357.0000 kg 1,820.00
Pasir Beton (PB) 0.4200 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.5400 m³ 641,666.67
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0800 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.012 Membuat 1 m³ beton bertulang 1 PC : 1.5 PB : 2,5 KR
Bahan
Portland Cement (PC) 386.0000 kg 1,820.00
Pasir Beton (PB) 0.4700 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.7800 m³ 641,666.67
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0800 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.013 Membuat 1 m³ beton bertulang 1 PC : 1 PB : 2 KR
Bahan
Portland Cement (PC) 479.0000 kg 1,820.00
Pasir Beton (PB) 0.3700 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.7400 m³ 641,666.67
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0800 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.014 Membuat 1 m³ beton mutu f'c=7,4 Mpa (K 100); slump (12 ± 2) cm; w/c = 0,87
Bahan
Portland Cement (PC) 247.0000 kg 1,820.00
Pasir Beton (PB) 0.6207 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.7400 m³ 641,666.67
Air 215.0000 liter 40.00
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2750 OH 110,000.00
Kepala Tukang 0.0280 OH 130,000.00
Mandor 0.0830 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.015 Membuat 1 m³ beton mutu f'c=9,8 Mpa (K 125); slump (12 ± 2) cm; w/c = 0,78
Bahan
Portland Cement (PC) 276.0000 kg 1,820.00
Pasir Beton (PB) 0.5914 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.7496 m³ 641,666.67
Air 215.0000 liter 40.00
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00

Analisa Harga Satuan Pekerjaan Page 38


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Tukang Batu 0.2750 OH 110,000.00
Kepala Tukang 0.0280 OH 130,000.00
Mandor 0.0830 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.016 Membuat 1 m³ beton mutu f'c=12,2 Mpa (K 150); slump (12 ± 2) cm; w/c = 0,72
Bahan
Portland Cement (PC) 299.0000 kg 1,820.00
Pasir Beton (PB) 0.5707 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.7533 m³ 641,666.67
Air 215.0000 liter 40.00
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2750 OH 110,000.00
Kepala Tukang 0.0280 OH 130,000.00
Mandor 0.0830 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.017 Membuat 1 m³ beton mutu f'c=7,4 Mpa (K 100); slump (3-6) cm; w/c = 0,87
Bahan
Portland Cement (PC) 230.0000 kg 1,820.00
Pasir Beton (PB) 0.6379 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.7607 m³ 641,666.67
Air 200.0000 liter 40.00
Jumlah (1)
Tenaga
Pekerja 1.2000 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0600 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.018 Membuat 1 m³ beton mutu f'c=14,5 Mpa (K 175); slump (12 ± 2) cm; w/c = 0,66
Bahan
Portland Cement (PC) 326.0000 kg 1,820.00
Pasir Beton (PB) 0.5429 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.7622 m³ 641,666.67
Air 215.0000 liter 40.00
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2750 OH 110,000.00
Kepala Tukang 0.0280 OH 130,000.00
Mandor 0.0830 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

G.019 Membuat 1 m³ beton mutu f'c=16,9 Mpa (K 200); slump (12 ± 2) cm; w/c = 0,61
Bahan
Portland Cement (PC) 352.0000 kg 1,820.00
Pasir Beton (PB) 0.5221 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.7637 m³ 641,666.67
Air 215.0000 liter 40.00
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2750 OH 110,000.00
Kepala Tukang 0.0280 OH 130,000.00
Mandor 0.0830 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.020 Membuat 1 m³ beton mutu f'c=19,3 Mpa (K 225); slump (12 ± 2) cm; w/c = 0,58
Bahan
Portland Cement (PC) 371.0000 kg 1,820.00
Pasir Beton (PB) 0.4986 m³ 107,150.00

Analisa Harga Satuan Pekerjaan Page 39


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Koral Beton (maksimum 30 mm) 0.7756 m³ 641,666.67
Air 215.0000 liter 40.00
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2750 OH 110,000.00
Kepala Tukang 0.0280 OH 130,000.00
Mandor 0.0830 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.021 Membuat 1 m³ beton mutu f'c=21,7 Mpa (K 250); slump (12 ± 2) cm; w/c = 0,56
Bahan
Portland Cement (PC) 384.0000 kg 1,820.00
Pasir Beton (PB) 0.4943 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.7696 m³ 641,666.67
Air 215.0000 liter 40.00
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2750 OH 110,000.00
Kepala Tukang 0.0280 OH 130,000.00
Mandor 0.0830 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.022 Membuat 1 m³ beton mutu f'c=24 Mpa (K 275); slump (12 ± 2) cm; w/c = 0,53
Bahan
Portland Cement (PC) 406.0000 kg 1,820.00
Pasir Beton (PB) 0.4886 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.7600 m³ 641,666.67
Air 215.0000 liter 40.00
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2750 OH 110,000.00
Kepala Tukang 0.0280 OH 130,000.00
Mandor 0.0830 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

G.023 Membuat 1 m³ beton mutu f'c=26,4 Mpa (K 300); slump (12 ± 2) cm; w/c = 0,52
Bahan
Portland Cement (PC) 413.0000 kg 1,820.00
Pasir Beton (PB) 0.4864 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.7563 m³ 641,666.67
Air 215.0000 liter 40.00
Jumlah (1)
Tenaga
Pekerja 1.6500 OH 90,000.00
Tukang Batu 0.2750 OH 110,000.00
Kepala Tukang 0.0280 OH 130,000.00
Mandor 0.0830 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.024 Membuat 1 m³ beton mutu f'c=28,8 Mpa (K 325); slump (12 ± 2) cm; w/c = 0,49
Bahan
Portland Cement (PC) 439.0000 kg 1,820.00
Pasir Beton (PB) 0.4786 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.7452 m³ 641,666.67
Air 215.0000 liter 40.00
Jumlah (1)
Tenaga
Pekerja 2.1000 OH 90,000.00
Tukang Batu 0.3500 OH 110,000.00
Kepala Tukang 0.0350 OH 130,000.00
Mandor 0.1050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

Analisa Harga Satuan Pekerjaan Page 40


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
G.025 Membuat 1 m³ beton mutu f'c=31,2 Mpa (K 350); slump (12 ± 2) cm; w/c = 0,48
Bahan
Portland Cement (PC) 448.0000 kg 1,820.00
Pasir Beton (PB) 0.4764 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.7407 m³ 641,666.67
Air 215.0000 liter 40.00
Jumlah (1)
Tenaga
Pekerja 2.1000 OH 90,000.00
Tukang Batu 0.3500 OH 110,000.00
Kepala Tukang 0.0350 OH 130,000.00
Mandor 0.1050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.026 Pembesian 1 kg dengan besi polos atau besi ulir
Bahan
Besi Beton (polos/ulir) 1.0500 kg 15,400.00
Kawat Beton 0.0150 kg 22,000.00
Jumlah (1)
Tenaga
Pekerja 0.0070 OH 90,000.00
Tukang Besi 0.0070 OH 110,000.00
Kepala Tukang 0.0007 OH 130,000.00
Mandor 0.0004 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.027 Memasang 10 kg jaring kawat baja /wiremesh
Bahan
Jaring Kawat Baja dilas/wiremesh 10.2000 kg 15,400.00
Kawat Beton 0.0500 kg 22,000.00
Jumlah (1)
Tenaga
Pekerja 0.0250 OH 90,000.00
Tukang Besi 0.0250 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0010 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.028 Memasang 1 m² bekisting untuk pondasi
Bahan
Kayu Bekisting 0.0400 m³ 1,650,000.00
Paku 5 cm - 10 cm 0.3000 kg 21,650.00
Minyak Bekisting 0.1000 liter 10,600.00
Jumlah (1)
Tenaga
Pekerja 0.5200 OH 90,000.00
Tukang Kayu 0.2600 OH 110,000.00
Kepala Tukang 0.0260 OH 130,000.00
Mandor 0.0260 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.029 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting pondasi

G.030 Memasang 1 m² bekisting untuk sloof


Bahan
Kayu bekisting 0.0450 m³ 1,650,000.00
Paku 5 cm - 10 cm 0.3000 kg 21,650.00
Minyak Bekisting 0.1000 liter 10,600.00
Jumlah (1)
Tenaga
Pekerja 0.5200 OH 90,000.00
Tukang Kayu 0.2600 OH 110,000.00
Kepala Tukang 0.0260 OH 130,000.00
Mandor 0.0260 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

Analisa Harga Satuan Pekerjaan Page 41


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
G.031 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting sloof

G.032 Memasang 1 m² bekisting untuk kolom


Bahan
Kayu Bekisting 0.0400 m³ 1,650,000.00
Paku 5 cm - 12 cm 0.4000 kg 21,650.00
Minyak Bekisting 0.2000 liter 10,600.00
Balok Kayu 0.0150 m³ 1,650,000.00
Papan Bekisting 0.0200 m3 1,650,000.00
Kayu Perancah 8.0000 m' 4,000.00
Jumlah (1)
Tenaga
Pekerja 0.6600 OH 90,000.00
Tukang Kayu 0.3300 OH 110,000.00
Kepala Tukang 0.0330 OH 130,000.00
Mandor 0.0330 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.033 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting kolom

G.034 Memasang 1 m² bekisting untuk balok


Bahan
Kayu Bekisting 0.0400 m³ 1,650,000.00
Paku 5 cm - 12 cm 0.4000 kg 21,650.00
Minyak Bekisting 0.2000 liter 10,600.00
Balok Kayu 0.0180 m³ 1,650,000.00
Papan Bekisting 0.0200 m3 1,650,000.00
Kayu Perancah 8.0000 m' 4,000.00
Jumlah (1)
Tenaga
Pekerja 0.6600 OH 90,000.00
Tukang Kayu 0.3300 OH 110,000.00
Kepala Tukang 0.0330 OH 130,000.00
Mandor 0.0330 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.035 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting balok

G.036 Memasang 1 m² bekisting untuk lantai


Bahan
Kayu Bekisting 0.0400 m³ 1,650,000.00
Paku 5 cm - 12 cm 0.4000 kg 21,650.00
Minyak Bekisting 0.2000 liter 10,600.00
Balok Kayu 0.0150 m³ 1,650,000.00
Papan Bekisting 0.0200 m3 1,650,000.00
Kayu Perancah 24.0000 m' 4,000.00
Jumlah (1)
Tenaga
Pekerja 0.6600 OH 90,000.00
Tukang Kayu 0.3300 OH 110,000.00
Kepala Tukang 0.0330 OH 130,000.00
Mandor 0.0330 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.037 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting lantai

G.038 Memasang 1 m² bekisting untuk dinding


Bahan
Kayu Bekisting 0.0300 m³ 1,650,000.00
Paku 5 cm - 12 cm 0.4000 kg 21,650.00
Minyak Bekisting 0.2000 liter 10,600.00
Balok Kayu 0.0200 m³ 1,650,000.00
Papan Bekisting 0.0200 m3 1,650,000.00
Kayu Perancah 12.0000 m' 4,000.00
Formite/Penjaga jarak Bekisting/spacer 4.0000 buah 16,000.00
Jumlah (1)
Tenaga

Analisa Harga Satuan Pekerjaan Page 42


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Pekerja 0.6600 OH 90,000.00
Tukang Kayu 0.3300 OH 110,000.00
Kepala Tukang 0.0330 OH 130,000.00
Mandor 0.0330 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.039 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting dinding

G.040 Memasang 1 m² bekisting untuk tangga


Bahan
Kayu Bekisting 0.0300 m³ 1,650,000.00
Paku 5 cm - 12 cm 0.4000 kg 21,650.00
Minyak Bekisting 0.1500 liter 10,600.00
Balok Kayu 0.0150 m³ 1,650,000.00
Papan Bekisting 0.0200 m3 1,650,000.00
Kayu Perancah 8.0000 m' 4,000.00
Jumlah (1)
Tenaga
Pekerja 0.6600 OH 90,000.00
Tukang Kayu 0.3300 OH 110,000.00
Kepala Tukang 0.0330 OH 130,000.00
Mandor 0.0330 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.041 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting tangga

G.042 Memasang 1 m² jembatan untuk pengecoran beton


Bahan
Kayu Bekisting 0.0264 m³ 1,650,000.00
Paku 5 cm - 12 cm 0.6000 kg 21,650.00
Kayu Perancah 2.0000 m' 4,000.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Tukang Kayu 0.0500 OH 110,000.00
Kepala Tukang 0.0050 OH 130,000.00
Mandor 0.0080 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.043 Memasang 1 m³ pondasi beton bertulang (150 kg besi + bekisting)
Bahan
Kayu Bekisting 0.2000 m³ 1,650,000.00
Paku 5 cm - 12 cm 1.5000 kg 21,650.00
Minyak Bekisting 0.4000 liter 10,600.00
Besi Beton (polos/ulir) 157.5000 kg 15,400.00
Kawat Beton 2.2500 kg 22,000.00
Portland Cement (PC) 336.0000 kg 1,820.00
Pasir Beton (PB) 0.5400 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.8100 m³ 641,666.67
Jumlah (1)
Tenaga
Pekerja 5.3000 OH 90,000.000
Tukang Batu 0.2750 OH 110,000.000
Tukang Kayu 1.3000 OH 110,000.000
Tukang Besi 1.0500 OH 110,000.000
Kepala Tukang 0.2620 OH 130,000.000
Mandor 0.2650 OH 140,000.000
Jumlah (2)
Jumlah (1) + (2)
G.044 Memasang 1 m³ sloof beton bertulang (200 kg besi + bekisting)
Bahan
Kayu Bekisting 0.2700 m³ 1,650,000.00
Paku 5 cm - 12 cm 2.0000 kg 21,650.00
Minyak Bekisting 0.6000 liter 10,600.00
Besi Beton (polos/ulir) 210.0000 kg 15,400.00
Kawat Beton 3.0000 kg 22,000.00
Portland Cement (PC) 336.0000 kg 1,820.00

Analisa Harga Satuan Pekerjaan Page 43


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Pasir Beton (PB) 0.5400 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.8100 m³ 641,666.67
Jumlah (1)
Tenaga
Pekerja 5.6500 OH 90,000.00
Tukang Batu 0.2750 OH 110,000.00
Tukang Kayu 1.5600 OH 110,000.00
Tukang Besi 1.4000 OH 110,000.00
Kepala Tukang 0.3230 OH 130,000.00
Mandor 0.2830 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.045 Memasang 1 m³ kolom beton bertulang (300 kg besi + bekisting)
Bahan
Kayu Bekisting 0.4000 m³ 1,650,000.00
Paku 5 cm - 12 cm 4.0000 kg 21,650.00
Minyak Bekisting 2.0000 liter 10,600.00
Besi Beton (polos/ulir) 315.0000 kg 15,400.00
Kawat Beton 4.5000 kg 22,000.00
Portland Cement (PC) 336.0000 kg 1,820.00
Pasir Beton (PB) 0.5400 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.8100 m³ 641,666.67
Balok Kayu 0.1500 m³ 1,650,000.00
Plywood tebal 9 mm 3.5000 lembar 154,000.00
Kayu Perancah 80.0000 m' 4,000.00
Jumlah (1)
Tenaga
Pekerja 7.0500 OH 90,000.00
Tukang Batu 0.2750 OH 110,000.00
Tukang Kayu 1.6500 OH 110,000.00
Tukang Besi 2.1000 OH 110,000.00
Kepala Tukang 0.4030 OH 130,000.00
Mandor 0.3530 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

G.046 Memasang 1 m³ balok beton bertulang (200 kg besi + bekisting)


Bahan
Kayu Bekisting 0.3200 m³ 1,650,000.00
Paku 5 cm - 12 cm 3.2000 kg 21,650.00
Minyak Bekisting 1.6000 liter 10,600.00
Besi Beton (polos/ulir) 210.0000 kg 15,400.00
Kawat Beton 3.0000 kg 22,000.00
Portland Cement (PC) 336.0000 kg 1,820.00
Pasir Beton (PB) 0.5400 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.8100 m³ 641,666.67
Balok Kayu 0.1400 m³ 1,650,000.00
Plywood tebal 9 mm 2.8000 lembar 154,000.00
Kayu Perancah 64.0000 m' 4,000.00
Jumlah (1)
Tenaga
Pekerja 6.3500 OH 90,000.00
Tukang Batu 0.2750 OH 110,000.00
Tukang Kayu 1.6500 OH 110,000.00
Tukang Besi 1.4000 OH 110,000.00
Kepala Tukang 0.3330 OH 130,000.00
Mandor 0.3180 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.047 Memasang 1 m³ kolom beton bertulang (150 kg besi + bekisting)
Bahan
Kayu Bekisting 0.3200 m³ 1,650,000.00
Paku 5 cm - 12 cm 3.2000 kg 21,650.00
Minyak Bekisting 1.6000 liter 10,600.00
Besi Beton (polos/ulir) 157.5000 kg 15,400.00
Kawat Beton 2.2500 kg 22,000.00

Analisa Harga Satuan Pekerjaan Page 44


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Portland Cement (PC) 336.0000 kg 1,820.00
Pasir Beton (PB) 0.5400 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.8100 m³ 641,666.67
Balok Kayu 0.1200 m³ 1,650,000.00
Plywood tebal 9 mm 2.8000 lembar 154,000.00
Kayu Perancah 128.0000 m' 4,000.00
Jumlah (1)
Tenaga
Pekerja 5.3000 OH 90,000.00
Tukang Batu 0.2750 OH 110,000.00
Tukang Kayu 1.3000 OH 110,000.00
Tukang Besi 1.0500 OH 110,000.00
Kepala Tukang 0.2650 OH 130,000.00
Mandor 0.2650 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.048 Memasang 1 m³ dinding beton bertulang (150 kg besi + bekisting)
Bahan
Kayu Bekisting 0.2400 m³ 1,650,000.00
Paku 5 cm - 12 cm 3.2000 kg 21,650.00
Minyak Bekisting 1.6000 liter 10,600.00
Besi Beton (polos/ulir) 157.5000 kg 15,400.00
Kawat Beton 2.2500 kg 22,000.00
Portland Cement (PC) 336.0000 kg 1,820.00
Pasir Beton (PB) 0.5400 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.8100 m³ 641,666.67
Balok Kayu 0.1600 m³ 1,650,000.00
Plywood tebal 9 mm 2.8000 lembar 154,000.00
Kayu Perancah 96.0000 m' 4,000.00
Jumlah (1)
Tenaga
Pekerja 5.3000 OH 90,000.00
Tukang Batu 0.2750 OH 110,000.00
Tukang Kayu 1.3000 OH 110,000.00
Tukang Besi 1.0500 OH 110,000.00
Kepala Tukang 0.2620 OH 130,000.00
Mandor 0.2650 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.049 Memasang 1 m³ dinding beton bertulang (200 kg besi + bekisting)
Bahan
Kayu Bekisting 0.2500 m³ 1,650,000.00
Paku 5 cm - 12 cm 3.0000 kg 21,650.00
Minyak Bekisting 1.2000 liter 10,600.00
Besi Beton (polos/ulir) 210.0000 kg 15,400.00
Kawat Beton 3.0000 kg 22,000.00
Portland Cement (PC) 336.0000 kg 1,820.00
Pasir Beton (PB) 0.5400 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.8100 m³ 641,666.67
Balok Kayu Meranti 5/7 0.1050 m³ 1,650,000.00
Plywood tebal 9 mm 2.5000 lembar 154,000.00
Kayu Perancah 56.0000 m' 4,000.00
Jumlah (1)
Tenaga
Pekerja 5.6500 OH 90,000.00
Tukang Batu 0.2750 OH 110,000.00
Tukang Kayu 1.5600 OH 110,000.00
Tukang Besi 1.4000 OH 110,000.00
Kepala Tukang 0.3230 OH 130,000.00
Mandor 0.2830 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.050 Memasang 1 m' kolom praktis beton bertulang (11 x 11 cm)
Bahan
Kayu Bekisting 0.0020 m³ 1,650,000.00
Paku 5 cm - 12 cm 0.0100 kg 21,650.00
Minyak Bekisting 0.0000 liter 10,600.00

Analisa Harga Satuan Pekerjaan Page 45


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Besi Beton (polos/ulir) 3.0000 kg 15,400.00
Kawat Beton 0.4500 kg 22,000.00
Portland Cement (PC) 4.0000 kg 1,820.00
Pasir Beton (PB) 0.0060 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.0090 m³ 641,666.67
Jumlah (1)
Tenaga
Pekerja 0.1800 OH 90,000.00
Tukang Batu 0.0200 OH 110,000.00
Tukang Kayu 0.0200 OH 110,000.00
Tukang Besi 0.0200 OH 110,000.00
Kepala Tukang 0.0060 OH 130,000.00
Mandor 0.0090 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
G.051 Memasang 1 m' ring balok beton bertulang (10 x 15 cm)
Bahan
Kayu Bekisting 0.0030 m³ 1,650,000.00
Paku 5 cm - 12 cm 0.0200 kg 21,650.00
Minyak Bekisting 0.0000 liter 10,600.00
Besi Beton (polos/ulir) 3.6000 kg 15,400.00
Kawat Beton 0.0500 kg 22,000.00
Portland Cement (PC) 5.5000 kg 1,820.00
Pasir Beton (PB) 0.0090 m³ 107,150.00
Koral Beton (maksimum 30 mm) 0.0150 m³ 641,666.67
Jumlah (1)
Tenaga
Pekerja 0.2970 OH 90,000.00
Tukang Batu 0.0330 OH 110,000.00
Tukang Kayu 0.0330 OH 110,000.00
Tukang Besi 0.0330 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

H. PEKERJAAN PENUTUP ATAP SNI 03-3436-2002


H.001 Memasang 1 m² rooflight fibreglass (180 x 90) cm
Bahan
Rooflight Fibreglass 0.6000 lbr 119,800.00
Paku Biasa 2" - 5" 0.0500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1400 OH 90,000.00
Tukang Kayu 0.0670 OH 110,000.00
Kepala Tukang 0.0070 OH 130,000.00
Mandor 0.0070 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
H.002 Memasang 1 m² atap genteng glazzur
Bahan
Genteng glazzur 25.0000 bh 4,700.00
Jumlah (1)
Tenaga
Pekerja 0.1500 Oh 90,000.00
Tukang Kayu 0.0750 Oh 110,000.00
Kepala Tukang 0.0080 Oh 130,000.00
Mandor 0.0080 Oh 140,000.00
Jumlah (2)
Jumlah (1) + (2)
H.003 Memasang 1 m' bubung genteng glazzur
Bahan
Genteng bubung glazuur 5.0000 bh 6,100.00

Analisa Harga Satuan Pekerjaan Page 46


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Semen portland 8.0000 Kg 1,820.00
Pasir Pasang 0.0320 M3 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.4000 Oh 90,000.00
Tukang Kayu 0.2000 Oh 110,000.00
Kepala Tukang 0.0200 Oh 130,000.00
Mandor 0.0020 Oh 140,000.00
Jumlah (2)
Jumlah (1) + (2)
H.004 Memasang 1 m² atap genteng beton
Bahan
Genteng Beton 11.0000 bh 7,300.00
Paku 2" - 5" 0.0300 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 110,000.00
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
H.005 Memasang 1 m' nok genteng beton
Bahan
Nok Genteng Beton 3.5000 bh 9,100.00
Paku 2" - 5" 0.0500 kg 21,650.00
Portland Cement (PC) 10.8000 kg 1,820.00
Pasir Pasang 0.0320 m³ 107,150.00
Cement Warna 1.0000 kg 16,500.00
Jumlah (1)
Tenaga
Pekerja 0.4000 OH 90,000.00
Tukang Kayu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0200 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
H.006 Memasang 1 m² atap sirap
Bahan
Genteng Sirap 60.0000 bh 2,300.00
Paku ½" - 1" 0.2000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1660 OH 90,000.00
Tukang Kayu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0080 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
H.007 Memasang 1 m' nok atap sirap
Bahan
Seng Plat 3' -6' BJLS 20 0.4000 lbr 15,000.00
Paku ½" - 1" 0.0600 kg 21,650.00
Paku 2" - 5" 0.0500 kg 21,650.00
Papan Kayu Meranti 0.0040 m³ 1,870,000.00
Jumlah (1)
Tenaga
Pekerja 0.1250 OH 90,000.00
Tukang Kayu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0060 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
H.008 Memasang 1 m² atap seng gelombang Bjls 30
Bahan
Seng Gelombang 3' - 6' BJLS 30 0.7000 lbr 64,950.00
Paku ½" - 1" 0.0200 kg 21,650.00

Analisa Harga Satuan Pekerjaan Page 47


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Jumlah (1)
Tenaga
Pekerja 0.1200 OH 90,000.00
Tukang Kayu 0.0600 OH 110,000.00
Kepala Tukang 0.0060 OH 130,000.00
Mandor 0.0060 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
H.009 Memasang 1 m² atap seng gelombang Bjls 20
Bahan
Seng Gelombang 3' - 6' BJLS 20 0.7000 lbr 40,700.00
Paku ½" - 1" 0.0200 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1200 OH 90,000.00
Tukang Kayu 0.0600 OH 110,000.00
Kepala Tukang 0.0060 OH 130,000.00
Mandor 0.0060 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
H.010 Memasang 1 m' atap bubungan seng Bjls 30
Bahan
Seng Plat 3' - 6' BJLS 30 1.0000 m 52,500.00
Paku ½" - 1" 0.0600 kg 21,650.00
Papan Lembasung/ Sejenis 0.0400 m3 1,870,000.00

Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Tukang Kayu 0.0700 OH 110,000.00
Kepala Tukang 0.0080 OH 130,000.00
Mandor 0.0060 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
H.011 Menutup atap dengan genteng metal surya roof per m2
Bahan
Genteng metal surya roof 1.6234 lbr 79,375.00
Paku genteng metal 12.0000 Bh 605.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
H.012 Menutup bubungan pada genteng metal Surya roof per m'
Bahan
Bubungan surya roof 2.5000 Bh 33,300.00
Paku genteng metal 10.0000 Bh 605.00
Kayu Lembasung/ sejenis 0.0040 m³ 1,870,000.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
H.013 Menutup Atap dengan genteng Metal sakura roof per m2
Bahan
Genteng metal sakura roof 1.6234 lbr 45,200.00
Paku genteng metal 12.0000 Bh 605.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00

Analisa Harga Satuan Pekerjaan Page 48


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
H.014 Menutup bubungan pada genteng metal Sakura roof per m'
Bahan
Bubungan sakura roof 2.5000 Bh 33,300.00
Paku genteng metal 10.0000 Bh 605.00
Kayu Lembasung/ sejenis 0.0040 m³ 1,870,000.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
H.015 Pasang aluminium foil / sisalation per 1 M2
Bahan
Sisalation / aluminium foil 1.0500 m² 50,400.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Tukang 0.0500 OH 110,000.00
Kepala Tukang 0.0050 OH 130,000.00
Mandor 0.0080 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

I. PEKERJAAN LANGIT-LANGIT SNI 03-2838-2002


I.001 Memasang 1 m² langit-langit lambriziring kayu, tebal 9 mm
Bahan
Papan Kayu 0.0150 m³ 1,870,000.00
Paku Triplek 0.0100 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.6000 OH 90,000.00
Tukang Kayu 0.8000 OH 110,000.00
Kepala Tukang 0.0800 OH 130,000.00
Mandor 0.0300 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
I.002 Memasang 1 m² langit-langit plywood ukuran (120 x 240) cm; tbl. 9 mm
Bahan
Plywood tbl. 9 mm 0.3750 lembar 154,000.00
Paku Triplek 0.0300 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
I.003 Memasang 1 m² langit-langit plywood ukuran (120 x 240) cm; tbl. 3 mm
Bahan
Plywood tbl. 3 mm 0.3750 lembar 60,500.00
Paku Triplek 0.0300 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0050 OH 140,000.00

Analisa Harga Satuan Pekerjaan Page 49


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Jumlah (2)
Jumlah (1) + (2)
I.004 Memasang 1 m² langit-langit plywood ukuran (60 x 120) cm; tbl. 9 mm
Bahan
Plywood tbl. 9 mm 0.3750 lembar 154,000.00
Paku Triplek 0.0300 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.0700 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0035 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
I.005 Memasang 1 m² langit-langit plywood ukuran (60 x 120) cm; tbl. 3 mm
Bahan
Plywood tbl. 3 mm 0.3750 lembar 60,500.00
Paku Triplek 0.0300 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.0700 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0035 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

I.006 Memasang 1 m² langit-langit teakwood ukuran (60 x 120) cm; tbl. 4 mm dan 6 mm
Bahan
Teakwood 0.3750 lembar 154,400.00
Paku Triplek 0.0300 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.0700 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0035 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
I.007 Memasang 1 m² langit-langit lat kayu bengkirai
Bahan
Papan Kayu Bengkirai 0.0240 m³ 2,090,000.00
Paku 0.0100 kg 21,650.00
Paku Sekrup 0.0500 kg 31,100.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 90,000.00
Tukang Kayu 0.6000 OH 110,000.00
Kepala Tukang 0.0600 OH 130,000.00
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
I.008 Memasang 1 m² langit-langit lat kayu meranti
Bahan
Papan Kayu Meranti 0.0240 m³ 1,870,000.00
Paku 0.0100 kg 21,650.00
Paku Sekrup 0.0500 kg 31,100.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 90,000.00
Tukang Kayu 0.6000 OH 110,000.00
Kepala Tukang 0.0600 OH 130,000.00
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

I.009 Memasang 1 m² Plywood 9 mm, rangka kayu meranti

Analisa Harga Satuan Pekerjaan Page 50


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Bahan
Kaso Kayu Meranti 0.0230 m³ 1,870,000.00
Paku 0.0600 kg 21,650.00
Plywood 4' x 8' x 9 mm 0.3900 lbr 154,000.00
Jumlah (1)
Tenaga
Pekerja 0.2700 OH 90,000.00
Tukang Kayu 0.4000 OH 110,000.00
Kepala Tukang 0.0400 OH 130,000.00
Mandor 0.0135 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
I.010 Memasang 1 m² Plywood 3mm, rangka kayu meranti
Bahan
Kaso Kayu Meranti 0.0230 m³ 1,870,000.00
Paku 0.0600 kg 21,650.00
Plywood 4' x 8' x 3mm 0.3900 lbr 60,500.00
Jumlah (1)
Tenaga
Pekerja 0.2700 OH 90,000.00
Tukang Kayu 0.4000 OH 110,000.00
Kepala Tukang 0.0400 OH 130,000.00
Mandor 0.0135 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
I.011 Memasang 1 m² langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm
Bahan
Gypsum Board 0.3640 lembar 91,200.00
Paku Sekrup 0.1100 kg 31,100.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.0500 OH 110,000.00
Kepala Tukang 0.0050 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
I.012 Memasang 1 m' list gipsum
Bahan
List gipsum 1.0500 m' 30,000.00
Tepung Gipsum 0.1500 kg 5,000.00
Jumlah (1)
Tenaga
Pekerja 0.0600 OH 90,000.00
Tukang Kayu 0.0600 OH 110,000.00
Kepala Tukang 0.0060 OH 130,000.00
Mandor 0.0030 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
I.013 Memasang 1 m' list kayu profil
Bahan
List Kayu Profil 1.0500 m' 20,000.00
Paku Triplek 0.0100 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.0500 OH 90,000.00
Tukang Kayu 0.0500 OH 110,000.00
Kepala Tukang 0.0050 OH 130,000.00
Mandor 0.0030 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

J. PEKERJAAN SANITASI SNI


J.001 Memasang 1 buah kloset duduk
Bahan

Analisa Harga Satuan Pekerjaan Page 51


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Kolset Duduk 1.0000 bh 1,650,000.00
Perlengkapan 6% harga kloset 99,000.00
Jumlah (1)
Tenaga
Pekerja 3.3000 OH 90,000.00
Tukang Batu 1.1000 OH 110,000.00
Kepala Tukang 0.0010 OH 130,000.00
Mandor 0.1600 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.002 Memasang 1 buah kloset jongkok porselen
Bahan
Kloset Jongkok Porselen 1.0000 bh 239,775.00
Portland Cement (PC) 6.0000 kg 1,820.00
Pasir Pasang 0.0100 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Batu 1.5000 OH 110,000.00
Kepala Tukang 1.5000 OH 130,000.00
Mandor 0.1600 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.003 Memasang 1 buah kloset jongkok teraso
Bahan
Kloset Jongkok Teraso 1.0000 bh 106,480.00
Bata Merah 8 x 8 x 16 cm 6.0000 bh 990.00
Portland Cement (PC) 6.0000 kg 1,820.00
Pasir Pasang 0.0100 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Batu 1.5000 OH 110,000.00
Kepala Tukang 0.3000 OH 130,000.00
Mandor 0.1100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.004 Memasang 1 buah urinoir
Bahan
Urinoir 1.0000 bh 2,462,350.00
Perlengkapan 30% harga urinoir 738,705.00
Portland Cement (PC) 6.0000 kg 1,820.00
Pasir Pasang 0.0100 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Batu 1.0000 OH 110,000.00
Kepala Tukang 0.1000 OH 130,000.00
Mandor 0.1000 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.005 Memasang 1 buah wastafel
Bahan
Wastafel 1.0000 bh 1,375,000.00
Perlengkapan 12% harga wastafel 165,000.00
Portland Cement (PC) 6.0000 kg 1,820.00
Pasir Pasang 0.0100 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.2000 OH 90,000.00
Tukang Batu 1.4500 OH 110,000.00
Kepala Tukang 0.1500 OH 130,000.00
Mandor 0.1000 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.006 Memasang 1 buah bak mandi fibreglass volume 0,30 m³

Analisa Harga Satuan Pekerjaan Page 52


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Bahan
Bak Fibreglass 1.0000 bh 500,000.00
Perlengkapan 18% harga bak 90,000.00
Jumlah (1)
Tenaga
Pekerja 1.8000 OH 90,000.00
Tukang Batu 2.7000 OH 110,000.00
Kepala Tukang 0.5400 OH 130,000.00
Mandor 0.1100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.007 Memasang 1 buah bak mandi batu bata volume 0,30 m³
Bahan
Bata Merah 8 x x8 x 16 cm 223.4375 bh 990.00
Portland Cement (PC) 120.0000 kg 1,820.00
Pasir Pasang 0.3000 m³ 107,150.00
Keramik Dinding 20x25 cm 2.1780 m² 77,000.00
Semen Nat 6.0000 kg 16,500.00
Jumlah (1)
Tenaga
Pekerja 6.0000 OH 90,000.00
Tukang Batu 3.0000 OH 110,000.00
Kepala Tukang 0.3000 OH 130,000.00
Mandor 0.3000 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.008 Memasang 1 buah badkip fiberglass
Bahan
Badkip Fibreglass 1.0000 bh 552,400.00
Perlengkapan 20% harga badkip 110,480.00
Jumlah (1)
Tenaga
Pekerja 0.0000 OH 90,000.00
Tukang Batu 0.0750 OH 110,000.00
Kepala Tukang 0.7500 OH 130,000.00
Mandor 0.2500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.009 Membuat 1 buah bak beton volume 1m³
Bahan
Beton 1 : 1½ : 2½ (G.009) 0.9000 m³ 1,443,830.50
Besi Beton 180.0000 kg 15,400.00
Kayu Cetakan 0.0800 m³ 1,650,000.00
Keramik Dinding 20x25 cm 5.0000 m² 77,000.00
Perlengkapan 10% harga total bahan 318,623.05
Jumlah (1)
Tenaga
Pekerja 3.5000 OH 90,000.00
Tukang Batu 4.5000 OH 110,000.00
Kepala Tukang 0.9000 OH 71,500.00
Mandor 0.9000 OH 77,000.00
Jumlah (2)
Jumlah (1) + (2)
J.010 Memasang 1 buah bak kontrol pas. batu bata ukuran (30 x 30) cm tinggi 35 cm
Bahan
Bata Merah 8 x 8 x 16 cm 94.4010 bh 990.00
Portland Cement (PC) 44.0000 kg 1,820.00
Pasir Pasang 0.0700 m³ 107,150.00
Batu Kerikil 0.0700 m³ 242,000.00
Besi Beton 1.6000 kg 15,400.00
Pasir Beton 0.0600 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 3.2000 OH 90,000.00
Tukang Batu 1.0150 OH 110,000.00
Kepala Tukang 0.0015 OH 130,000.00
Mandor 0.0160 OH 140,000.00

Analisa Harga Satuan Pekerjaan Page 53


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Jumlah (2)
Jumlah (1) + (2)
J.011 Memasang 1 buah bak kontrol pas. batu bata ukuran (45 x 45) cm tinggi 60 cm
Bahan
Bata Merah 8 x 8 x 16 cm 162.7603 bh 990.00
Portland Cement (PC) 77.0000 kg 1,820.00
Pasir Pasang 0.1300 m³ 107,150.00
Batu Kerikil 0.0200 m³ 242,000.00
Besi Beton 2.6000 kg 15,400.00
Pasir Beton 0.0900 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.4200 OH 90,000.00
Tukang Batu 0.4730 OH 110,000.00
Kepala Tukang 0.0470 OH 130,000.00
Mandor 0.0710 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.012 Memasang 1 buah bak kontrol pas. batu bata ukuran (60 x 60) cm tinggi 65 cm
Bahan
Bata Merah 8 x 8 x 16 cm 241.5365 bh 990.00
Portland Cement (PC) 114.0000 kg 1,820.00
Pasir Pasang 0.1840 m³ 107,150.00
Batu Kerikil 0.0330 m³ 242,000.00
Besi Beton 4.8500 kg 15,400.00
Pasir Beton 0.1200 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 2.1600 OH 90,000.00
Tukang Batu 0.7200 OH 110,000.00
Kepala Tukang 0.0720 OH 130,000.00
Mandor 0.1080 OH 140,000.00
Tukang Gali/Buruh Tak terlatih 0.1000 OH 140,000
Jumlah (2)
Jumlah (1) + (2)
J.013 Memasang 1 m' pipa PVC tipe AW Ø ½"
Bahan
Pipa PVC 1.2000 m' 5,000.00
Perlengkapan 35% harga pipa 1,750.00
Jumlah (1)
Tenaga
Pekerja 0.0360 OH 90,000.00
Tukang Batu 0.0600 OH 110,000.00
Kepala Tukang 0.0060 OH 130,000.00
Mandor 0.0018 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.014 Memasang 1 m' pipa PVC tipe AW Ø ¾"
Bahan
Pipa PVC 1.2000 m' 6,000.00
Perlengkapan 35% harga pipa 2,100.00
Jumlah (1)
Tenaga
Pekerja 0.0360 OH 90,000.00
Tukang Batu 0.0600 OH 110,000.00
Kepala Tukang 0.0060 OH 130,000.00
Mandor 0.0018 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

J.015 Memasang 1 m' pipa PVC tipe AW Ø 1"


Bahan
Pipa PVC 1.2000 m' 8,325.00
Perlengkapan 35% harga pipa 2,913.75
Jumlah (1)
Tenaga
Pekerja 0.0360 OH 90,000.00

Analisa Harga Satuan Pekerjaan Page 54


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Tukang Batu 0.0600 OH 110,000.00
Kepala Tukang 0.0060 OH 130,000.00
Mandor 0.0018 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.016 Memasang 1 m' pipa PVC tipe AW Ø 1½"
Bahan
Pipa PVC 1.2000 m' 15,300.00
Perlengkapan 35% harga pipa 5,355.00
Jumlah (1)
Tenaga
Pekerja 0.0360 OH 90,000.00
Tukang Batu 0.0600 OH 110,000.00
Kepala Tukang 0.0060 OH 130,000.00
Mandor 0.0018 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.017 Memasang 1 m' pipa PVC tipe AW Ø 2"
Bahan
Pipa PVC 1.2000 m' 19,975.00
Perlengkapan 35% harga pipa 6,991.25
Jumlah (1)
Tenaga
Pekerja 0.0540 OH 90,000.00
Tukang Batu 0.0900 OH 110,000.00
Kepala Tukang 0.0090 OH 130,000.00
Mandor 0.0027 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.018 Memasang 1 m' pipa PVC tipe AW Ø 2½"
Bahan
Pipa PVC 1.2000 m' 28,625.00
Perlengkapan 35% harga pipa 10,018.75
Jumlah (1)
Tenaga
Pekerja 0.0360 OH 90,000.00
Tukang Batu 0.0600 OH 110,000.00
Kepala Tukang 0.0060 OH 130,000.00
Mandor 0.0018 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.019 Memasang 1 m' pipa PVC tipe AW Ø 3"
Bahan
Pipa PVC 1.2000 m' 34,950.00
Perlengkapan 35% harga pipa 12,232.50
Jumlah (1)
Tenaga
Pekerja 0.0810 OH 90,000.00
Tukang Batu 0.1350 OH 110,000.00
Kepala Tukang 0.0135 OH 130,000.00
Mandor 0.0041 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.020 Memasang 1 m' pipa PVC tipe AW Ø 4"
Bahan
Pipa PVC 1.2000 m' 54,250.00
Perlengkapan 35% harga pipa 18,987.50
Jumlah (1)
Tenaga
Pekerja 0.0810 OH 90,000.00
Tukang Batu 0.1350 OH 110,000.00
Kepala Tukang 0.0135 OH 130,000.00
Mandor 0.0041 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.021 Memasang 1 buah bak cuci piring satinless steel
Bahan

Analisa Harga Satuan Pekerjaan Page 55


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Bak Cuci Satinless Steel 1.0000 bh 532,400.00
Water Drain + Aksesoris 1.0000 set 186,340.00
Jumlah (1)
Tenaga
Pekerja 0.0300 OH 90,000.00
Tukang Batu 0.3000 OH 110,000.00
Kepala Tukang 0.0300 OH 130,000.00
Mandor 0.0015 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.022 Memasang 1 buah kran Ø ¾" atau ½" Biasa
Bahan
Kran Air 1.0000 bh 11,000.00
Seal Tape 0.0250 bh 3,000.00
Jumlah (1)

Tenaga
Pekerja 0.0100 OH 90,000.00
Tukang Batu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.023 Memasang 1 buah kran Ø ¾" atau ½" stanlis
Bahan
Kran Air 1.0000 bh 88,000.00
Seal Tape 0.0250 bh 3,000.00
Jumlah (1)
Tenaga
Pekerja 0.0100 OH 90,000.00
Tukang Batu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 110,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
J.024 Memasang 1 buah floordrain
Bahan
Floordrain 1.0000 bh 39,930.00
Jumlah (1)
Tenaga
Pekerja 0.0100 OH 90,000.00
Tukang Batu 0.1000 OH 110,000.00
Pipa PVC 4" berlobang jenis AW 9.0000 m' 108,556.50
Urugan kembali perataan tanah 0.5625 m³ 23,666.67
Tambahan upah 0.0650 ls 500,000.00
Jumlah

K. PEKERJAAN BESI DAN ALUMUNIUM Revisi SNI T-16-2002


K.001 Memasang 1 kg rangka atap baja
Bahan
Besi Profil IWF 1.1000 kg 17,300.00
Meni Besi 0.0800 kg 24,200.00
Jumlah (1)
Tenaga
Pekerja 0.0600 OH 90,000.00
Tukang Besi 0.0060 OH 110,000.00
Kepala Tukang 0.0060 OH 130,000.00
Mandor 0.0003 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
K.002 Memasang 1 kg Besi Profil
Bahan
Besi Profil 1.1500 kg 17,300.00
Jumlah (1)
Tenaga
Pekerja 0.0600 OH 90,000.00

Analisa Harga Satuan Pekerjaan Page 56


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Tukang Besi 0.0600 OH 110,000.00
Kepala Tukang 0.0060 OH 130,000.00
Mandor 0.0030 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
K.003 Mengerjakan 100 kg pekerjaan perakitan
Bahan
Solar 1.0000 ltr 9,900.00
Minyak Pelumas 0.1000 ltr 39,900.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Besi 0.1000 OH 110,000.00
Kepala Tukang 0.0010 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Sewa Alat 0.0080 Jam 56,100.00
Jumlah (2)
Jumlah (1) + (2)
K.004 Mengerjakan 1 cm pengelasan dengan las listrik
Bahan
Kawat Las Listrik 0.04 kg 29,700.00
Solar 0.0300 ltr 9,900.00
Minyak Pelumas 0.0040 ltr 39,900.00
Jumlah (1)
Tenaga
Pekerja 0.0040 OH 90,000.00
Tukang Besi 0.0020 OH 110,000.00
Kepala Tukang 0.0002 OH 130,000.00
Mandor 0.0002 OH 140,000.00
Sewa Alat 0.0170 Jam 56,100.00
Jumlah (2)
Jumlah (1) + (2)
K.005 Memasang 1 m² pintu gulung (rolling door) besi
Bahan
Pintu Gulung (Rolling Door) Besi 1.0000 m² 259,500.00
Jumlah (1)
Tenaga
Pekerja 1.2000 OH 90,000.00
Tukang Besi 1.2000 OH 110,000.00
Kepala Tukang 0.1200 OH 130,000.00
Mandor 0.0060 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
K.006 Memasang 1 m² pintu lipat (folding door)
Bahan
Pintu Lipat (Folding Door) 1.0000 m² 2,462,400.00
Jumlah (1)
Tenaga
Pekerja 0.4400 OH 90,000.00
Tukang Besi 0.4400 OH 110,000.00
Kepala Tukang 0.0440 OH 130,000.00
Mandor 0.0220 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
K.007 Memasang 1 m² rolling door alumunium
Bahan
Rolling Door Alumunium 1.0000 m² 1,271,105.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Alumunium 1.0000 OH 110,000.00
Kepala Tukang 0.1000 OH 130,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
K.008 Memasang 1 m² pintu alumunium
Bahan

Analisa Harga Satuan Pekerjaan Page 57


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Pintu Alumunium 1.000 m2 732,100.00
Jumlah (1)
Tenaga
Pekerja 1.0500 OH 90,000.00
Tukang Besi 1.0500 OH 110,000.00
Kepala Tukang 0.1050 OH 130,000.00
Mandor 0.0052 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
K.009 Memasang 1 m' Kusen Alumunium 4 "
Bahan
Kusen Alumunium 1.1000 m' 199,650.00
Skrub Fixer 2.0000 Bh 10,000.00
Sealent 0.0600 Tube 79,860.00
Jumlah (1)
Tenaga
Pekerja 0.0430 OH 90,000.00
Tukang Besi 0.0430 OH 110,000.00
Kepala Tukang 0.0043 OH 130,000.00
Mandor 0.0021 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
K.010 1 M2 Pintu Kaca Rangka Alumunium SNI 7393 : 2008
Bahan
Rangka Pintu Alumunium 4.4000 m' 199,650.00
Profil kaca 4.5000 m' 35,000.00
Sealent 0.2700 Tube 79,860.00
Jumlah (1)
Tenaga
Pekerja 0.0850 OH 90,000.00
Tukang 0.0850 OH 110,000.00
Kep Tukang 0.0090 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
K.011 1 M2 Daun Jendela Kaca Rangka Alumunium SNI DT 90-0014-2007
Bahan
Rangka Daun Jendela Alumunium 3.4125 m' 199,650.00
Profil kaca 3.4125 m' 35,000.00
Sealent 0.2700 Tube 79,860.00
Jumlah (1)
Tenaga
Pekerja 0.0850 OH 90,000.00
Tukang 0.0850 OH 110,000.00
Kep Tukang 0.0090 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
K.012 Memasang 1 m² terali besi
Bahan
Besi Strip 2 x 3 11.5000 m' 1,666.67
Pengelasan 27.0800 cm 3,232.30
Jumlah (1)
Tenaga
Pekerja 1.6700 OH 90,000.00
Tukang Las 1.6700 OH 110,000.00
Kepala Tukang 0.1670 OH 130,000.00
Mandor 0.0830 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
K.013 Memasang 1 m² kawat harmonika
Bahan
Kawat Harmonika 1.1000 m² 18,700.00
Paku Biasa ½" - 1" 0.0200 kg 21,650.00
Kayu Papan meranti 0.0018 m³ 1,870,000.00

Analisa Harga Satuan Pekerjaan Page 58


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0005 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
K.014 Memasang 1 m² kawat nyamuk
Bahan
Kawat Nyamuk 1.1000 m² 18,700.00
Besi Strip (0,2 x 2 cm) 1.7160 kg 24,600.00
Pengelasan 11.1100 cm 3,232.30
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 49,500.00
Tukang Kayu 0.1000 OH 60,500.00
Kepala Tukang 0.0100 OH 71,500.00
Mandor 0.0005 OH 77,000.00
Jumlah (2)
Jumlah (1) + (2)
K.015 Memasang 1 m² jendela nako & tralis
Bahan
Jendela Nako / kaca 5 mm 1.1000 lbr 173,000.00
Paku sekrup 1 - 2,5 cm 0.0200 kg 31,100.00
Besi Strip 0.0250 kg 24,600.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 90,000.00
Tukang Kayu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0010 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
K.016 Memasang 1 m' talang datar seng BJLS 30
Bahan
Seng Plat 3' x 6 ' BJLS 30 1.1000 m 52,500.00
Paku Biasa ½" - 1" atau sekrup 0.0150 kg 31,100.00
Kayu lembasung/kapur 0.0190 m³ 1,870,000.00
Jumlah (1)
Tenaga
Pekerja 0.2000 OH 90,000.00
Tukang Kayu 0.4000 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
K.017 Memasang 1 m' talang miring seng BJLS 30
Bahan
Seng Plat 3' x 6 ' BJLS 30 1.1000 m 52,500.00
Paku Biasa ½" - 1" atau sekrup 0.0150 kg 31,100.00
Kayu lembasung/kapur 0.0190 m³ 1,870,000.00
Flincote/Meni Besi 0.3000 kg 24,200.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Tukang Kayu 0.4000 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0013 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
K.018 Memasang 1 m' talang ½ lingkaran Ø 10 cm, seng BJLS 30
Bahan
Seng Plat 3' x 6 ' BJLS 30 1.1000 m 52,500.00
Paku Biasa ½" - 1" atau sekrup 0.1000 kg 31,100.00
Besi Strip 0.5000 kg 24,600.00
Jumlah (1)

Analisa Harga Satuan Pekerjaan Page 59


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Tenaga
Pekerja 0.1500 OH 90,000.00
Tukang Kayu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0013 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

K.019 Memasang 1 m' talang ½ lingkaran Ø 10 cm, seng BJLS 20


Bahan
Seng Plat 3' x 6 ' BJLS 20 1.1000 lbr 15,000.00
Paku Biasa ½" - 1" atau sekrup 0.0100 kg 31,100.00
Besi Strip 0.5000 kg 24,600.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Tukang Kayu 0.2500 OH 110,000.00
Kepala Tukang 0.0250 OH 130,000.00
Mandor 0.0013 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
K.020 Memasang 1 m' talang U dari PVC
Bahan
Talang U dari PVC 1.0000 m 28,750.00
Klam U 1.0000 bh 18,700.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Tukang Kayu 0.5000 OH 110,000.00
Kepala Tukang 0.0500 OH 130,000.00
Mandor 0.0150 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

L. PEKERJAAN KUNCI DAN KACA


L.001 Memasang 1 buah kunci tanam kwalitas baik
Bahan
Kunci Tanam 1.0000 bh 211,750.00
Jumlah (1)
Tenaga
Pekerja 0.0600 OH 90,000.00
Tukang Kayu 0.6000 OH 110,000.00
Kepala Tukang 0.0600 OH 130,000.00
Mandor 0.0030 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
L.002 Memasang 1 buah kunci tanam biasa
Bahan
Kunci Tanam Biasa 1.0000 bh 50,000.00
Jumlah (1)
Tenaga
Pekerja 0.0050 OH 90,000.00
Tukang Kayu 0.5000 OH 110,000.00
Kepala Tukang 0.0050 OH 130,000.00
Mandor 0.0003 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
L.004 Memasang 1 buah kunci tanam kamar mandi
Bahan
Kunci Tanam Kamar Mandi 1.0000 bh 72,600.00
Jumlah (1)
Tenaga
Pekerja 0.0050 OH 90,000.00
Tukang Kayu 0.5000 OH 110,000.00
Kepala Tukang 0.0050 OH 130,000.00

Analisa Harga Satuan Pekerjaan Page 60


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Mandor 0.0025 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
L.005 Memasang 1 buah engsel pintu
Bahan
Engsel Pintu 1.0000 bh 37,000.00
Jumlah (1)
Tenaga
Pekerja 0.0150 OH 90,000.00
Tukang Kayu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0008 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
L.006 Memasang 1 buah engsel jendela kupu-kupu
Bahan
Engsel Jendela Kupu-Kupu 1.0000 bh 22,000.00
Jumlah (1)
Tenaga
Pekerja 0.0100 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0005 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

L.007 Memasang 1 buah kait angin


Bahan
Kait Angin 1.0000 bh 19,800.00
Jumlah (1)
Tenaga
Pekerja 0.0150 OH 90,000.00
Tukang Kayu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0008 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
L.008 Memasang 1 buah kunci selot
Bahan
Kunci Selot / Gerendel 1.0000 bh 16,500.00
Jumlah (1)
Tenaga
Pekerja 0.0200 OH 90,000.00
Tukang Kayu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0010 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
L.009 Memasang 1 buah pegangan pintu / door holder
Bahan
Pegangan Pintu 1.0000 bh 330,000.00
Jumlah (1)
Tenaga
Pekerja 0.0500 OH 90,000.00
Tukang Kayu 0.5000 OH 110,000.00
Kepala Tukang 0.0500 OH 130,000.00
Mandor 0.0025 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
L.010 Pasang door closer 1 buah
Bahan
Door closer 1.0000 bh 137,500.00
Jumlah (1)
Tenaga
Pekerja 0.0500 OH 90,000.00

Analisa Harga Satuan Pekerjaan Page 61


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Tukang Kayu 0.5000 OH 110,000.00
Kepala Tukang 0.0500 OH 130,000.00
Mandor 0.0025 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
L.011 Pasang door stop 1 buah
Bahan
Door stop 1.0000 bh 27,500.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.0100 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0005 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

L.012 Memasang 1 buah rel pintu dorong


Bahan
Rel Pintu Dorong 1.0000 bh 2,298,600.00
Jumlah (1)
Tenaga
Pekerja 0.0600 OH 90,000.00
Tukang Kayu 0.6000 OH 110,000.00
Kepala Tukang 0.0600 OH 130,000.00
Mandor 0.0030 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
L.013 Memasang 1 m² kaca polos; tebal 3 mm
Bahan
Kaca 1.1000 m² 113,100.00
Jumlah (1)
Tenaga
Pekerja 0.0150 OH 90,000.00
Tukang Kayu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0008 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

L.014 Memasang 1 m² kaca polos; tebal 5 mm


Bahan
Kaca 1.1000 m² 173,000.00
Jumlah (1)
Tenaga
Pekerja 0.0150 OH 90,000.00
Tukang Kayu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0008 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
L.015 Memasang 1 m² kaca ryben; tebal 3 mm
Bahan
Kaca 1.1000 m² 171,700.00
Jumlah (1)
Tenaga
Pekerja 0.0150 OH 90,000.00
Tukang Kayu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0008 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
L.016 Memasang 1 m² kaca ryben; tebal 5 mm
Bahan
Kaca 1.1000 m² 237,800.00
Jumlah (1)
Tenaga

Analisa Harga Satuan Pekerjaan Page 62


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Pekerja 0.0150 OH 49,500.00
Tukang Kayu 0.1500 OH 60,500.00
Kepala Tukang 0.0150 OH 71,500.00
Mandor 0.0008 OH 77,000.00
Jumlah (2)
Jumlah (1) + (2)
L.018 Memasang 1 m² buram; tebal 3 mm
Bahan
Kaca 1.1000 m² 135,800.00
Jumlah (1)
Tenaga
Pekerja 0.0150 OH 90,000.00
Tukang Kayu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0008 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
L.019 Memasang 1 m² buram; tebal 5 mm
Bahan
Kaca 1.1000 m² 223,600.00
Jumlah (1)
Tenaga
Pekerja 0.0150 OH 90,000.00
Tukang Kayu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0008 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
L.020 Memasang 1 m² kaca cermin; tebal 3 mm
Bahan
Kaca 1.1000 m² 226,300.00
Jumlah (1)
Tenaga
Pekerja 0.0150 OH 90,000.00
Tukang Kayu 0.1500 OH 110,000.00
Kepala Tukang 0.0150 OH 130,000.00
Mandor 0.0008 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
L.021 Memasang 1 m² kaca patri lokal
Bahan
Kaca 1.1000 m² 1,019,500.00
Jumlah (1)
Tenaga
Jumlah (1)
Tenaga
Pekerja 0.2600 OH 49,500.00
Tukang Batu 0.1300 OH 60,500.00
Kepala Tukang 0.0130 OH 71,500.00
Mandor 0.0130 OH 77,000.00
Jumlah (2)
Jumlah (1) + (2)
M.001 Memasang 1 m² lantai keramik ukuran 60 x 60 cm
Bahan
Keramik 60 x 60 cm 1.0000 m² 465,850.00
Portland Cement (PC) 9.6000 kg 1,820.00
Pasir Pasang 0.0450 m³ 107,150.00
Semen Warna 1.3000 kg 16,500.00
Jumlah (1)
Tenaga
Pekerja 0.7000 OH 90,000.00
Tukang Batu 0.3500 OH 110,000.00
Kepala Tukang 0.0350 OH 130,000.00
Mandor 0.0300 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

Analisa Harga Satuan Pekerjaan Page 63


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5

M.002 Memasang 1 m² lantai keramik ukuran 40 x 40 cm


Bahan
Keramik 40 x 40 cm 1.0000 m² 77,000.00
Portland Cement (PC) 9.8000 kg 1,820.00
Pasir Pasang 0.0450 m³ 107,150.00
Semen Warna 1.3000 kg 16,500.00
Jumlah (1)
Tenaga
Pekerja 0.7000 OH 90,000.00
Tukang Batu 0.3500 OH 110,000.00
Kepala Tukang 0.0350 OH 130,000.00
Mandor 0.0300 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
M.003 Memasang 1 m² lantai keramik ukuran 30 x 30 cm
Bahan
Keramik 30 x 30 cm 1.0000 m² 66,000.00
Portland Cement (PC) 10.0000 kg 1,820.00
Pasir Pasang 0.0450 m³ 107,150.00
Semen Warna 1.5000 kg 16,500.00
Jumlah (1)
Tenaga
Pekerja 0.7000 OH 90,000.00
Tukang Batu 0.3500 OH 110,000.00
Kepala Tukang 0.0350 OH 130,000.00
Mandor 0.0300 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
M.004 Pasang lantai keramik 20 x 20 cm per 1 M2
Bahan
keramik 20 x 20 cm 1.0000 m² 71,500.00
Portland Cement (PC) 10.4000 kg 1,820.00
Pasir Pasang 0.0420 m³ 107,150.00
Semen Warna 1.5000 kg 16,500.00
Jumlah (1)
Tenaga
Pekerja 0.7000 OH 90,000.00
Tukang Batu 0.3500 OH 110,000.00
Kepala Tukang 0.0350 OH 130,000.00
Mandor 0.0300 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
M.005 Memasang 1 m² dinding keramik ukuran 20 x 20 cm
Bahan
Keramik 1.0000 m² 71,500.00
Portland Cement (PC) 9.3000 kg 1,820.00
Pasir Pasang 0.0180 m³ 107,150.00
Semen Warna 1.9400 kg 16,500.00
Jumlah (1)
Tenaga
Pekerja 0.9000 OH 90,000.00
Tukang Batu 0.4500 OH 110,000.00
Kepala Tukang 0.0450 OH 130,000.00
Mandor 0.0450 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
M.006 Memasang 1 m² dinding keramik ukuran 20 x 25 cm
Bahan
Keramik 1.0000 m² 77,000.00
Portland Cement (PC) 9.3000 kg 1,820.00
Pasir Pasang 0.0180 m³ 107,150.00
Semen Warna 1.9400 kg 16,500.00
Jumlah (1)
Tenaga
Pekerja 0.9000 OH 90,000.00
Tukang Batu 0.4500 OH 110,000.00

Analisa Harga Satuan Pekerjaan Page 64


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Kepala Tukang 0.0450 OH 130,000.00
Mandor 0.0450 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
M.007 Memasang 1 m² dinding porselin 11 x 11 cm
Bahan
porselin 1.0000 m² 99,825.00
Portland Cement (PC) 9.3000 kg 1,820.00
Pasir Pasang 0.0180 m³ 107,150.00
Semen Warna 1.5000 kg 16,500.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Batu 0.5000 OH 110,000.00
Kepala Tukang 0.0500 OH 130,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

M.008 Memasang 1 m' plint keramik ukuran 10 x 20 cm


Bahan
Plint Keramik 10/20 5.3000 bh 29,500.00
Portland Cement (PC) 1.1400 kg 1,820.00
Pasir Pasang 0.0030 m³ 107,150.00
Semen Warna 0.0250 kg 16,500.00
Jumlah (1)
Tenaga
Pekerja 0.0900 OH 90,000.00
Tukang Batu 0.0900 OH 110,000.00
Kepala Tukang 0.0090 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
M.009 Memasang 1 m² lantai ubin granito ukuran 40 x 40 cm
Bahan
Ubin Granito 40 x 40 cm 1.0000 m2 279,600.00
Portland Cement (PC) 9.8000 kg 1,820.00
Pasir Pasang 0.0450 m³ 107,150.00
Semen Warna 1.3000 kg 16,500.00
Jumlah (1)
Tenaga
Pekerja 0.2500 OH 90,000.00
Tukang Batu 0.1250 OH 110,000.00
Kepala Tukang 0.0130 OH 130,000.00
Mandor 0.0130 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
M.010 Memasang 1 m² lantai ubin granito ukuran 40x 40 cm (motif khusus)
Bahan
Ubin Granito 40 x 40 cm 1.0000 m2 1,464,100.00
Portland Cement (PC) 9.8000 kg 1,820.00
Pasir Pasang 0.0450 m³ 107,150.00
Semen Warna 1.3000 kg 16,500.00
Jumlah (1)
Tenaga
Pekerja 0.2500 OH 90,000.00
Tukang Batu 0.1250 OH 110,000.00
Kepala Tukang 0.0130 OH 130,000.00
Mandor 0.0130 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
M.011 Memasang 1 m² lantai marmer ukuran 40 x 40 cm
Bahan
Marmer 1.0000 m² 213,000.00
Portland Cement (PC) 9.8000 kg 1,820.00
Pasir Pasang 0.0450 m³ 107,150.00

Analisa Harga Satuan Pekerjaan Page 65


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Semen Warna 1.3000 kg 16,500.00
Jumlah (1)
Tenaga
Pekerja 0.7000 OH 90,000.00
Tukang Batu 0.3500 OH 110,000.00
Kepala Tukang 0.0350 OH 130,000.00
Mandor 0.0350 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
M.012 Memasang 1 m² dinding batu alam
Bahan
Batu Paras 1.1000 m² 223,850.00
Portland Cement (PC) 11.7500 kg 1,820.00
Pasir Pasang 0.0350 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.7000 OH 90,000.00
Tukang Batu 0.3500 OH 110,000.00
Kepala Tukang 0.0350 OH 130,000.00
Mandor 0.0350 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
M.013 Memasang 1 m' plint kayu ukuran 2 x 10 cm
Bahan
Papan Kayu Lembasung 0.0030 m³ 1,870,000.00
Paku Sekrup 5 cm 0.0500 kg 31,100.00
Jumlah (1)
Tenaga
Pekerja 0.1200 OH 90,000.00
Tukang Kayu 0.1200 OH 110,000.00
Kepala Tukang 0.0120 OH 130,000.00
Mandor 0.0060 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
M.014 Memasang Koral Sikat Motif M2
Bahan
Koral Sikat 3.0000 Zak 75,000.00
Portland Cement (PC) 14.1600 kg 1,820.00
Pasir Pasang 0.0230 M3 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.6000 OH 90,000.00
Tukang Batu 1.5000 OH 110,000.00
Kepala Tukang 0.0900 OH 130,000.00
Mandor 0.0600 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

N. PEKERJAAN PENGECATAN SNI


N.001 Mengikis / mengerok permukaan cat tembok lama 1 M2
Bahan
Soda Api 0.0500 kg 13,300.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Mandor 0.0025 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

N.002 Mencuci bidang permukaan tembok yang pernah di cat per 1 M2


Bahan
Sabun 0.0500 kg 20,000.00
Jumlah (1)
Tenaga

Analisa Harga Satuan Pekerjaan Page 66


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Pekerja 0.1500 OH 90,000.00
Mandor 0.0025 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
N.003 Mengerok karat cat lama permukaan baja dengan cara manual per 1 m2
Bahan
Sabun 0.0500 kg 20,000.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Mandor 0.0025 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

N.004 Mendempul dan Menggosok 1 m² kayu


Bahan
Dempul Jadi 0.0800 kg 22,000.00
Minyak Cat/ tinner 0.0200 kg 25,300.00
Batu Apung 0.0100 kg 46,600.00
Jumlah (1)
Tenaga
Pekerja 0.0400 OH 90,000.00
Tukang Cat 0.0400 OH 110,000.00
Kepala Tukang 0.0040 OH 130,000.00
Mandor 0.0025 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
N.005 Mengecat 1 m² bidang kayu lama
Bahan
Plamir 0.1500 kg 22,000.00
Cat Dasar 0.1700 kg 24,200.00
Cat Penutup 0.1700 kg 47,300.00
Jumlah (1)
Tenaga
Pekerja 0.0700 OH 90,000.00
Tukang Cat 0.0750 OH 110,000.00
Kepala Tukang 0.0075 OH 130,000.00
Mandor 0.0025 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
N.006 Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
Bahan
Cat Meni 0.2000 kg 24,200.00
Plamir 0.1500 kg 22,000.00
Cat Dasar 0.1700 kg 24,200.00
Cat Penutup 0.2600 kg 47,300.00
Jumlah (1)
Tenaga
Pekerja 0.0700 OH 90,000.00
Tukang Cat 0.0090 OH 110,000.00
Kepala Tukang 0.0060 OH 130,000.00
Mandor 0.0025 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
N.007 Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 3 lps cat penutup)
Bahan
Cat Meni 0.2000 kg 24,200.00
Plamir 0.1500 kg 22,000.00
Cat Dasar 0.1700 kg 24,200.00
Cat Penutup 0.3500 kg 47,300.00
Jumlah (1)
Tenaga
Pekerja 0.0700 OH 90,000.00
Tukang Cat 0.1050 OH 110,000.00
Kepala Tukang 0.0040 OH 130,000.00
Mandor 0.0025 OH 140,000.00

Analisa Harga Satuan Pekerjaan Page 67


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Jumlah (2)
Jumlah (1) + (2)
N.008 Pelaburan bidang kayu dengan teak oil per 1 M2
Bahan
Teak oil 0.3600 Ltr 33,400.00
Jumlah (1)
Tenaga
Pekerja 0.0400 Oh 90,000.00
Tukang Cat 0.0600 OH 110,000.00
Kepala Tukang 0.0160 OH 130,000.00
Mandor 0.0025 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
N.009 Melabur 1 m² bidang kayu dengan politur
Bahan
Politur 0.2000 kg 47,300.00
Politur Jadi 0.1500 kg 49,500.00
Ampelas 2.0000 lbr 5,000.00
Jumlah (1)
Tenaga
Tukang Cat 0.0600 OH 110,000.00
Kepala Tukang 0.0160 OH 130,000.00
Mandor 0.0025 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
N.010 Melabur 1 m² bidang kayu dengan cat residu
Bahan
Residu 0.3500 ltr 9,600.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Mandor 0.0060 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
N.011 Melabur 1 m² bidang kayu dengan vernis
Bahan
Vernis 0.1500 ltr 49,500.00
Dempul 0.0500 kg 22,000.00
Ampelas 0.1000 lbr 5,000.00
Kuas 0.0100 bh 17,600.00
Jumlah (1)
Tenaga
Pekerja 0.1600 OH 90,000.00
Tukang Cat 0.1600 OH 110,000.00
Kepala Tukang 0.0160 OH 130,000.00
Mandor 0.0025 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
N.012 Mengecat 1 m² bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
Bahan
Plamir 0.1000 kg 8,360.00
Cat Dasar 0.1000 kg 24,200.00
Cat Penutup 0.2600 kg 23,100.00
Jumlah (1)
Tenaga
Pekerja 0.0200 OH 90,000.00
Tukang Cat 0.0630 OH 110,000.00
Kepala Tukang 0.0063 OH 130,000.00
Mandor 0.0025 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
N.013 Mengecat 1 m² bidang tembok lama (1 lps cat dsr, 2 lps cat penutup)
Bahan
Cat Alkali 0.1000 kg 44,000.00
Cat ICI Weathershield 0.3600 kg 85,800.00
Jumlah (1)
Tenaga

Analisa Harga Satuan Pekerjaan Page 68


HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Pekerja 0.0200 OH 90,000.00
Tukang Cat 0.0630 OH 110,000.00
Kepala Tukang 0.0063 OH 130,000.00
Mandor 0.0025 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
N.015 Pengecatan atap memakai cat khusus atap per m2
Bahan
Cat khusus 0.3500 Kg 115,500.00
Jumlah (1)
Tenaga
Pekerja 0.0167 Oh 90,000.00
Tukang Cat 0.0050 Oh 110,000.00
Kepala Tukang 0.0500 Oh 130,000.00
Mandor 0.0017 Oh 140,000.00
Jumlah (2)
Jumlah (1) + (2)
N.016 Pemasangan wall paper per 1 m2
Bahan
Wall paper 1.2000 M2 93,200.00
Perekat / lem 0.2000 Kg 38,500.00
Jumlah (1)
Tenaga
Pekerja 0.0200 Oh 90,000.00
Tukang Cat 0.2000 Oh 110,000.00
Kepala Tukang 0.0020 Oh 130,000.00
Mandor 0.0025 Oh 140,000.00
Jumlah (2)
Jumlah (1) + (2)
N.017 Mengecat 1 m² permukaan baja dengan meni besi
Bahan
Meni Besi 0.1000 kg 24,200.00
Kuas 0.0100 bh 17,600.00
Jumlah (1)
Tenaga
Pekerja 0.0200 OH 90,000.00
Tukang Cat 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
N.018 Mengecat 1 m² permukaan baja dengan meni besi dan perancah
Bahan
Meni Besi 0.1000 kg 24,200.00
Kuas 0.0100 bh 17,600.00
Perancah Kayu 0.0020 m³ 1,650,000.00
Jumlah (1)
Tenaga
Pekerja 0.2500 OH 90,000.00
Tukang Cat 0.2250 OH 110,000.00
Kepala Tukang 0.0225 OH 130,000.00
Mandor 0.0075 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)

Analisa Harga Satuan Pekerjaan Page 69


NALISA HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2014

JUMLAH
Rp.
6=(3x5)
SNI 03-2835-2002

20,000.00
4,550.00
535.75
2,178.00
134,640.00
1,299.00
4,680.00
167,882.75

36,000.00
22,000.00
2,600.00
2,800.00
63,400.00
231,282.75

20,000.00
4,550.00
77,940.00
535.75
2,178.00
134,640.00
1,299.00
10,890.00
252,032.75

36,000.00
22,000.00
2,600.00
2,800.00
63,400.00
315,432.75

16,000.00
3,640.00
252,500.00
535.75
2,178.00
1,299.00
276,152.75

27,000.00
22,000.00
2,600.00
2,800.00
54,400.00
330,552.75

22,440.00
433.00
13,090.00
35,963.00

Analisa Harga Satuan Pekerjaan Page 70


JUMLAH
Rp.
6=(3x5)

9,000.00
11,000.00
1,300.00
700.00
22,000.00
57,963.00

20,000.00
336,600.00
18,402.50
27,060.00
63,700.00
15,120.00
10,715.00
36,300.00
29,700.00
3,750.00
244,200.00
9,048.00
31,762.50
3,630.00
849,988.00

180,000.00
110,000.00
220,000.00
39,000.00
7,000.00
556,000.00
1,405,988.00

27,200.00
392,700.00
6,495.00
19,110.00
3,214.50
12,100.00
97,425.00
558,244.50

90,000.00
220,000.00
26,000.00
7,000.00
343,000.00
901,244.50

48,000.00
516,120.00
15,155.00
97,425.00
676,700.00

90,000.00
165,000.00
19,500.00
7,000.00
281,500.00
958,200.00

9,000.00
7,000.00
16,000.00

Analisa Harga Satuan Pekerjaan Page 71


JUMLAH
Rp.
6=(3x5)

20,000.00
347,820.00
6,495.00
32,760.00
3,214.50
12,100.00
97,425.00
81,675.00
601,489.50

90,000.00
220,000.00
26,000.00
7,000.00
343,000.00
944,489.50

64,680.00
53,625.00
1,071.50
119,376.50

90,000.00
7,000.00
97,000.00
216,376.50

600,030.00
46,620.00
646,650.00

600,030.00
4,620.00
604,650.00

1,800.00
1,100.00
28,050.00
30,950.00

270,000.00
12,600.00
282,600.00

11,250.00
1,750.00
13,000.00

11,250.00
1,750.00
13,000.00

45,000.00
7,000.00
52,000.00

9,000.00
1,400.00
10,400.00

18,000.00
11,000.00
1,300.00
2,800.00

Analisa Harga Satuan Pekerjaan Page 72


JUMLAH
Rp.
6=(3x5)
33,100.00

13,500.00
8,250.00
975.00
2,100.00
24,825.00

360,000.00
660,000.00
78,000.00
56,000.00
1,154,000.00

360,000.00
330,000.00
28,000.00
718,000.00

9,000.00
33,000.00
3,900.00
1,400.00
47,300.00

13,500.00
2,100.00
15,600.00

SNI

67,500.00
3,500.00
71,000.00

81,000.00
6,300.00
87,300.00

94,500.00
9,380.00
103,880.00

90,000.00
4,480.00
94,480.00

135,000.00
8,400.00
143,400.00

108,000.00
6,300.00
114,300.00

4,500.00
700.00
5,200.00

29,700.00

Analisa Harga Satuan Pekerjaan Page 73


JUMLAH
Rp.
6=(3x5)
1,400.00
31,100.00

46,440.00
7,000.00
53,440.00

22,500.00
1,166.67
23,666.67

45,000.00
7,000.00
52,000.00

120,960.00
120,960.00

27,000.00
1,400.00
28,400.00
149,360.00

145,200.00
145,200.00

22,500.00
3,500.00
26,000.00
171,200.00

79,200.00
79,200.00

22,500.00
3,500.00
26,000.00
105,200.00

SNI 03-2836-2002

517,440.00
713,440.00
33,645.10
1,264,525.10

135,000.00
66,000.00
7,800.00
10,500.00
219,300.00
1,483,825.10

517,440.00
485,940.00
45,753.05
1,049,133.05

Analisa Harga Satuan Pekerjaan Page 74


JUMLAH
Rp.
6=(3x5)
135,000.00
66,000.00
7,800.00
10,500.00
219,300.00
1,268,433.05

470,400.00
485,940.00
45,753.05
1,002,093.05

135,000.00
66,000.00
7,800.00
10,500.00
219,300.00
1,221,393.05

517,440.00
713,440.00
33,645.10
1,264,525.10

135,000.00
66,000.00
7,800.00
10,500.00
219,300.00
1,483,825.10

517,440.00
367,640.00
51,967.75
937,047.75

135,000.00
66,000.00
7,800.00
10,500.00
219,300.00
1,156,347.75

517,440.00
296,660.00
55,718.00
869,818.00

135,000.00
82,500.00
9,750.00
10,500.00
237,750.00
1,107,568.00

470,400.00
296,660.00
55,718.00
822,778.00

135,000.00
82,500.00
9,750.00

Analisa Harga Satuan Pekerjaan Page 75


JUMLAH
Rp.
6=(3x5)
10,500.00
237,750.00
1,060,528.00

517,440.00
247,520.00
58,289.60
823,249.60

135,000.00
82,500.00
9,750.00
10,500.00
237,750.00
1,060,999.60

517,440.00
212,940.00
60,111.15
790,491.15

135,000.00
82,500.00
9,750.00
10,500.00
237,750.00
1,028,241.15

517,440.00
165,620.00
62,575.60
745,635.60

135,000.00
82,500.00
9,750.00
10,500.00
237,750.00
983,385.60

517,440.00
43,545.60
560,985.60

70,200.00
42,900.00
5,070.00
5,460.00
123,630.00
684,615.60

470,400.00
43,545.60
513,945.60

70,200.00
42,900.00
5,070.00
5,460.00
123,630.00
637,575.60
siklop; 60% beton campuran 1 PC : 2 PB : 3 KR dan 40 % batu belah

Analisa Harga Satuan Pekerjaan Page 76


JUMLAH
Rp.
6=(3x5)

206,976.00
353,080.00
33,430.80
278,850.00
1,940,400.00
39,600.00
2,852,336.80

306,000.00
93,500.00
11,050.00
23,800.00
434,350.00
3,286,686.80

sumuran; diameter 100 cm

194,040.00
353,080.00
33,430.80
278,850.00
859,400.80

214,200.00
33,000.00
3,900.00
11,200.00
262,300.00
1,121,700.80
ancang (40x40) cm, beton bertulang

1,915.20
10,072.10
89,375.00
110,110.00
693,000.00
19,800.00
59,840.00
2,598.00
954.00
2,006.40
989,670.70

90,000.00
73,700.00
8,710.00
7,000.00
179,410.00
1,169,080.70
ancang (35x35) cm, beton bertulang

1,612.80
8,572.00
74,479.17
89,180.00
531,300.00
15,400.00
50,490.00
2,598.00
954.00
1,672.00
776,257.97

72,000.00
55,000.00
6,500.00

Analisa Harga Satuan Pekerjaan Page 77


JUMLAH
Rp.
6=(3x5)
5,600.00
139,100.00
915,357.97
cang Beton 25/25 per m'

32,500.00
56,100.00
88,600.00

45,000.00
45,000.00
133,600.00

SNI 03-2837-2002
bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 1 PP

118,800.00
116,534.60
6,321.85
241,656.45

58,500.00
22,000.00
2,600.00
4,200.00
87,300.00
328,956.45
bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 2 PP

118,800.00
79,170.00
8,572.00
206,542.00

54,000.00
22,000.00
2,600.00
4,200.00
82,800.00
289,342.00

bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 3 PP

118,800.00
59,969.00
9,750.65
188,519.65

54,000.00
22,000.00
2,600.00
4,200.00
82,800.00
271,319.65
bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 4 PP

118,800.00
48,321.00
9,964.95
177,085.95

54,000.00
22,000.00
2,600.00
4,200.00

Analisa Harga Satuan Pekerjaan Page 78


JUMLAH
Rp.
6=(3x5)
82,800.00
259,885.95
bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 5 PP

118,800.00
40,404.00
10,929.30
170,133.30

54,000.00
22,000.00
2,600.00
4,200.00
82,800.00
252,933.30
bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 6 PP

118,800.00
33,670.00
13,072.30
165,542.30

54,000.00
22,000.00
2,600.00
4,200.00
82,800.00
248,342.30
bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 1 PP

59,400.00
50,596.00
3,000.20
112,996.20

28,800.00
11,000.00
1,300.00
2,100.00
43,200.00
156,196.20
bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 2 PP

59,400.00
34,489.00
4,071.70
97,960.70

27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
139,360.70

bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 3 PP

59,400.00
26,153.40
4,286.00
89,839.40

27,000.00
11,000.00
1,300.00
2,100.00
41,400.00

Analisa Harga Satuan Pekerjaan Page 79


JUMLAH
Rp.
6=(3x5)
131,239.40
bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 4 PP

59,400.00
20,930.00
4,607.45
84,937.45

27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
126,337.45
bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 5 PP

59,400.00
17,617.60
4,821.75
81,839.35

27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
123,239.35
bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 6 PP

59,400.00
15,142.40
5,250.35
79,792.75

27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
121,192.75
bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 8 PP

59,400.00
11,830.00
5,357.50
76,587.50

27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
117,987.50
terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 3 PP

300,000.00
25,480.00
3,428.80
328,908.80

27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
370,308.80

Analisa Harga Satuan Pekerjaan Page 80


JUMLAH
Rp.
6=(3x5)

terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 4 PP

300,000.00
20,020.00
3,750.25
323,770.25

27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
365,170.25
bata berongga ekspose uk. (5x11x24) cm; campuran spesi 1 PC : 3 PP

700,000.00
25,480.00
3,428.80
728,908.80

27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
776,458.80

SNI 03-2837-2002
n 1 PC : 1 PP; tebal 15 mm

28,217.28
1,714.40
29,931.68

27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
77,481.68
n 1 PC : 2 PP; tebal 15 mm

18,607.68
2,143.00
20,750.68

27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
68,300.68
n 1 PC : 3 PP; tebal 15 mm

14,152.32
2,464.45
16,616.77

27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
64,166.77
n 1 PC : 4 PP; tebal 15 mm

Analisa Harga Satuan Pekerjaan Page 81


JUMLAH
Rp.
6=(3x5)

11,356.80
2,571.60
13,928.40

27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
61,478.40
n 1 PC : 5 PP; tebal 15 mm

9,434.88
2,785.90
12,220.78

27,000.00
16,500.00
1,950.00
1,400.00
46,850.00
59,070.78
n 1 PC : 6 PP; tebal 15 mm

8,037.12
2,893.05
10,930.17

27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
58,480.17
n 1 PC : 7 PP; tebal 15 mm

7,163.52
3,000.20
10,163.72

27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
57,713.72
n 1 PC : 8 PP; tebal 15 mm

6,289.92
3,107.35
9,397.27

27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
56,947.27
n 1 PC : 2 PP; tebal 20 mm

24,810.24
2,893.05
27,703.29

36,000.00

Analisa Harga Satuan Pekerjaan Page 82


JUMLAH
Rp.
6=(3x5)
22,000.00
2,600.00
3,080.00
63,680.00
91,383.29
n 1 PC : 3 PP; tebal 20 mm

18,869.76
3,321.65
22,191.41

23,400.00
22,000.00
2,600.00
3,080.00
51,080.00
73,271.41
n 1 PC : 4 PP; tebal 20 mm

15,142.40
3,428.80
18,571.20

36,000.00
22,000.00
2,600.00
30,800.00
91,400.00
109,971.20
n 1 PC : 5 PP; tebal 20 mm

12,579.84
3,750.25
16,330.09

36,000.00
22,000.00
2,600.00
3,080.00
63,680.00
80,010.09

n 1 PC : 6 PP; tebal 20 mm

10,716.16
3,857.40
14,573.56

36,000.00
22,000.00
2,860.00
3,080.00
63,940.00
78,513.56
n 1 PC : 2 PP; tebal 25 mm

28,210.00
1,392.95
29,602.95

27,000.00
22,000.00
2,600.00
1,820.00
53,420.00
83,022.95
n 1 PC : 3 PP; tebal 25 mm

Analisa Harga Satuan Pekerjaan Page 83


JUMLAH
Rp.
6=(3x5)

21,385.00
3,750.25
25,135.25

27,000.00
16,500.00
1,950.00
1,820.00
47,270.00
72,405.25
n 1 PC : 4 PP; tebal 25 mm

17,253.60
4,071.70
21,325.30

27,000.00
22,000.00
2,600.00
1,820.00
53,420.00
74,745.30
n 1 PC : 5 PP; tebal 25 mm

14,450.80
4,178.85
18,629.65

27,000.00
22,000.00
2,600.00
1,820.00
53,420.00
72,049.65
n 1 PC : 2 PP; tebal 30 mm

33,943.00
3,750.25
37,693.25

28,800.00
27,500.00
3,250.00
2,100.00
61,650.00
99,343.25

n 1 PC : 3 PP; tebal 30 mm

25,753.00
4,178.85
29,931.85

28,800.00
27,500.00
3,250.00
2,100.00
61,650.00
91,581.85
n 1 PC : 4 PP; tebal 30 mm

20,711.60
4,500.30
25,211.90

Analisa Harga Satuan Pekerjaan Page 84


JUMLAH
Rp.
6=(3x5)
28,800.00
27,500.00
3,250.00
2,100.00
61,650.00
86,861.90
n 1 PC : 5 PP; tebal 30 mm

14,905.80
4,821.75
19,727.55

28,800.00
27,500.00
3,250.00
2,100.00
61,650.00
81,377.55
1 PC : 3 PP; tebal 30 mm

12,867.40
2,250.15
15,117.55

13,500.00
7,700.00
910.00
1,120.00
23,230.00
38,347.55
1 PC : 5 PP; tebal 30 mm

9,434.88
2,785.90
12,220.78

13,500.00
7,700.00
910.00
1,120.00
23,230.00
35,450.78
n beton 1 PC : 2 PP; tebal 15 mm

16,926.00
1,928.70
18,854.70

23,400.00
22,000.00
2,600.00
1,820.00
49,820.00
68,674.70
n beton 1 PC : 3 PP; tebal 15 mm

12,867.40
2,250.15
15,117.55

23,400.00
22,000.00
2,600.00
1,820.00
49,820.00
64,937.55

Analisa Harga Satuan Pekerjaan Page 85


JUMLAH
Rp.
6=(3x5)

n skoning 1 PC : 2 PP; lebar 10 mm

910.00
1,392.95
2,302.95

7,200.00
44,000.00
5,200.00
560.00
56,960.00
59,262.95
n ciprat 1 PC : 2 PP; lebar 10 mm

7,862.40
642.90
8,505.30

27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
49,905.30
g siar pasangan dinding bata merah (=20 m')

5,656.56
5,656.56

13,500.00
8,250.00
1,040.00
1,120.00
23,910.00
29,566.56
g siar pasangan dinding conblock ekspose (=8 m')

2,912.00
2,912.00

6,300.00
3,850.00
520.00
560.00
11,230.00
14,142.00
g siar pasangan batu kali adukan 1 PC : 2 PP

11,538.80
1,285.80
12,824.60

27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
60,374.60

5,915.00
5,915.00

13,500.00
11,000.00
1,300.00

Analisa Harga Satuan Pekerjaan Page 86


JUMLAH
Rp.
6=(3x5)
1,400.00
27,200.00
33,115.00
n sudut

291.20
1,392.95
1,684.15

2,700.00
7,700.00
910.00
1,120.00
12,430.00
14,114.15

SNI 03-3434-2002
g 1 m³ kusen pintu dan kusen jendela; Kayu Lembasung/ Kapur

2,057,000.00
27,062.50
28,000.00
2,112,062.50

630,000.00
2,310,000.00
273,000.00
49,000.00
3,262,000.00
5,374,062.50
g 1 m³ kusen pintu dan kusen jendela; Kayu Kayu Meranti

2,244,000.00
27,062.50
28,000.00
2,299,062.50

540,000.00
1,980,000.00
234,000.00
42,000.00
2,796,000.00
5,095,062.50
g 1 m² pintu klamp sederhana; Kayu Lembasung/ Kapur

74,800.00
1,082.50
75,882.50

31,500.00
115,500.00
13,650.00
2,520.00
163,170.00
239,052.50
g 1 m² pintu klamp sederhana; Kayu Meranti

74,800.00
1,082.50
75,882.50

31,500.00
115,500.00
13,650.00
2,520.00
163,170.00

Analisa Harga Satuan Pekerjaan Page 87


JUMLAH
Rp.
6=(3x5)
239,052.50
g 1 m² daun pintu panel; Kayu Lembasung/ Kapur

74,800.00
14,000.00
88,800.00

90,000.00
330,000.00
39,000.00
7,000.00
466,000.00
554,800.00
g 1 m² daun pintu panel; Kayu Meranti

74,800.00
14,000.00
88,800.00

90,000.00
330,000.00
39,000.00
7,000.00
466,000.00
554,800.00
g 1 m² pintu dan jendela kaca; Kayu Lembasung/ Kapur

44,880.00
8,400.00
53,280.00

72,000.00
264,000.00
31,200.00
5,600.00
372,800.00
426,080.00
g 1 m² pintu dan jendela kaca; Kayu Meranti

44,880.00
8,400.00
53,280.00

72,000.00
264,000.00
31,200.00
5,600.00
372,800.00
426,080.00
g 1 m² pintu dan jendela jalusi; Lembasung/ Kapur

119,680.00
14,000.00
133,680.00

90,000.00
330,000.00
39,000.00
7,000.00
466,000.00
599,680.00
g 1 m² pintu dan jendela jalusi; Kayu Meranti

119,680.00
14,000.00
133,680.00

Analisa Harga Satuan Pekerjaan Page 88


JUMLAH
Rp.
6=(3x5)
90,000.00
330,000.00
39,000.00
7,000.00
466,000.00
599,680.00
g 1 m² daun pintu kayu lapis (plywood); rangka tertutup Kayu Kapur

46,750.00
649.50
14,000.00
154,000.00
215,399.50

63,000.00
231,000.00
27,300.00
4,900.00
326,200.00
541,599.50
g 1 m² pintu plywood rangkap; rangka ekspose Kayu Kapur

47,872.00
649.50
14,000.00
154,000.00
216,521.50

72,000.00
264,000.00
31,200.00
5,600.00
372,800.00
589,321.50
g 1 m² jalusi kusen; Kayu Kapur/ Lembasung

112,200.00
3,247.50
115,447.50

60,300.00
220,000.00
26,000.00
46,900.00
353,200.00
468,647.50
g 1 m² jalusi kusen; Kayu Meranti

112,200.00
3,247.50
115,447.50

60,300.00
220,000.00
26,000.00
46,900.00
353,200.00
468,647.50
g 1 m² pintu teakwood rangkap; rangka ekspose Kayu Kapur

46,750.00
649.50
8,400.00
68,200.00
123,999.50

Analisa Harga Satuan Pekerjaan Page 89


JUMLAH
Rp.
6=(3x5)
72,000.00
264,000.00
5,200.00
5,600.00
346,800.00
470,799.50
g 1 m² pintu teakwood rangkap lapis formika; rgk. ekspose Ky. Meranti

46,750.00
649.50
22,400.00
68,200.00
27,750.00
165,749.50

76,500.00
280,500.00
33,150.00
6,020.00
396,170.00
561,919.50
g 1 m³ konstruksi kuda kuda konvensional; Kayu Kapur/ Lembasung

2,057,000.00
369,000.00
121,240.00
2,547,240.00

360,000.00
1,320,000.00
156,000.00
28,000.00
1,864,000.00
4,411,240.00
g 1 m³ konstruksi kuda kuda konvensional; Kayu Meranti

2,057,000.00
369,000.00
121,240.00
2,547,240.00

360,000.00
1,320,000.00
156,000.00
28,000.00
1,864,000.00
4,411,240.00
g 1 m³ konstruksi kuda kuda ekspose; Kayu Kapur/ Lembasung

2,244,000.00
369,000.00
121,240.00
2,734,240.00

603,000.00
2,211,000.00
261,300.00
46,900.00
3,122,200.00
5,856,440.00

g 1 m³ konstruksi kuda kuda ekspose; Kayu Meranti

2,244,000.00
369,000.00
121,240.00
2,734,240.00

Analisa Harga Satuan Pekerjaan Page 90


JUMLAH
Rp.
6=(3x5)

603,000.00
2,211,000.00
261,300.00
46,900.00
3,122,200.00
5,856,440.00
g 1 m³ konstruksi gording; Kayu Kapur/ Lembasung

2,057,000.00
369,000.00
64,950.00
2,490,950.00

216,000.00
792,000.00
93,600.00
16,800.00
1,118,400.00
3,609,350.00
g 1 m³ konstruksi gording; Kayu Meranti

2,057,000.00
369,000.00
64,950.00
2,490,950.00

216,000.00
792,000.00
93,600.00
16,800.00
1,118,400.00
3,609,350.00
g 1 m² rangka atap genteng kodok; Kayu Kapur/ Lembasung

22,440.00
6,732.00
5,412.50
34,584.50

9,000.00
11,000.00
1,300.00
700.00
22,000.00
56,584.50
g 1 m² rangka atap genteng kodok; Kayu Meranti

22,440.00
6,732.00
5,412.50
34,584.50

9,000.00
11,000.00
1,300.00
700.00
22,000.00
56,584.50
g 1 m² rangka atap genteng keramik; Kayu Kapur/ Lembasung

26,180.00
6,732.00
5,412.50
38,324.50

9,000.00

Analisa Harga Satuan Pekerjaan Page 91


JUMLAH
Rp.
6=(3x5)
11,000.00
1,300.00
700.00
22,000.00
60,324.50
g 1 m² rangka atap genteng keramik; Kayu Meranti

26,180.00
6,732.00
5,412.50
38,324.50

9,000.00
11,000.00
1,300.00
700.00
22,000.00
60,324.50
g 1 m² rangka atap genteng beton; Kayu Kapur/ Lembasung

26,180.00
106,590.00
5,412.50
138,182.50

9,000.00
11,000.00
1,300.00
700.00
22,000.00
160,182.50
g 1 m² rangka atap genteng beton; Kayu Meranti

26,180.00
106,590.00
5,412.50
138,182.50

9,000.00
11,000.00
1,300.00
700.00
22,000.00
160,182.50
g 1 m² rangka atap genteng metal; Kayu Lembasung/Kapur

22,440.00
3,247.50
25,687.50

9,000.00
11,000.00
1,300.00
700.00
22,000.00
47,687.50
g 1 m² rangka atap genteng metal; Kayu Meranti

22,440.00
3,247.50
25,687.50

9,000.00
11,000.00
1,300.00
700.00
22,000.00

Analisa Harga Satuan Pekerjaan Page 92


JUMLAH
Rp.
6=(3x5)
47,687.50

atap sirap; Kayu Meranti

308,550.00
4,330.00
312,880.00

10,800.00
13,200.00
1,560.00
840.00
26,400.00
339,280.00
angit-langit (100 x 100) cm; Kayu Meranti

22,440.00
2,165.00
24,605.00

13,500.00
27,500.00
3,250.00
10,500.00
54,750.00
79,355.00

angit-langit (50 x 100) cm; Kayu Meranti

28,798.00
4,330.00
33,128.00

13,500.00
33,000.00
3,900.00
10,500.00
60,900.00
94,028.00

angit-langit (60 x 60) cm; Kayu Meranti

30,481.00
5,412.50
35,893.50

18,000.00
33,000.00
3,900.00
1,400.00
56,300.00
92,193.50
uk. (3 x 20) cm; Kapur/ Lembasung

20,196.00
2,165.00
22,361.00

9,000.00
22,000.00
2,600.00
700.00
34,300.00
56,661.00
uk. (3 x 30) cm; Kayu Kapur/Lembasung

Analisa Harga Satuan Pekerjaan Page 93


JUMLAH
Rp.
6=(3x5)
20,570.00
1,082.50
21,652.50

9,000.00
22,000.00
3,250.00
700.00
34,950.00
56,602.50
uk. 2x (3 x 20) cm; Kayu Kapur/ Lembasung

27,115.00
1,299.00
28,414.00

13,500.00
27,500.00
3,250.00
10,500.00
54,750.00
83,164.00
uk. 2x (2 x 20) cm; Kayu Kapur/ Lembasung

16,082.00
1,299.00
17,381.00

9,000.00
11,000.00
1,300.00
7,000.00
28,300.00
45,681.00
dinding pemisah (60 x 120) cm; Kayu Meranti

52,360.00
3,247.50
55,607.50

13,500.00
49,500.00
5,850.00
1,120.00
69,970.00
125,577.50
pemisah teakwood rangkap; Kayu Kapur/ Lembasung

52,360.00
3,247.50
58,652.00
15,680.00
129,939.50

13,500.00
49,500.00
5,850.00
1,120.00
69,970.00
199,909.50
pemisah plywood rangkap; Kayu Meranti

52,360.00
3,247.50
132,440.00
15,680.00
203,727.50

Analisa Harga Satuan Pekerjaan Page 94


JUMLAH
Rp.
6=(3x5)

18,000.00
66,000.00
7,800.00
1,400.00
93,200.00
296,927.50
meranti berlidah per m2 -

46,750.00
4,330.00
51,080.00

54,000.00
198,000.00
23,400.00
4,200.00
279,600.00
330,680.00
lambriziring dari papan; Kayu Meranti

13,090.00
2,165.00
4,665.00
19,920.00

54,000.00
198,000.00
23,400.00
4,200.00
279,600.00
299,520.00
lambriziring dari plywood ukuran (120 x 240) cm

61,600.00
1,082.50
62,682.50

2,250.00
8,250.00
975.00
182.00
11,657.00
74,339.50
uiter ukuran 3 x 30 cm; Kayu Meranti

18,700.00
216.50
18,916.50

6,300.00
22,000.00
2,600.00
560.00
31,460.00
50,376.50
uiter ukuran 2 x 20 cm; Kayu Meranti

8,228.00
216.50
8,444.50

6,300.00
22,000.00
2,600.00
560.00
31,460.00

Analisa Harga Satuan Pekerjaan Page 95


JUMLAH
Rp.
6=(3x5)
39,904.50
cincin dan dilancipkan

9,000.00
27,500.00
3,250.00
700.00
40,450.00
40,450.00

g dan lubang pada balok pemikul tiap-tiap pasangan pen dan lubang

66,000.00
7,800.00
73,800.00
73,800.00
anah lunak per m'

162,000.00
4,400.00
520.00
6,020.00
172,940.00
172,940.00
216,175.00
259,410.00
, gelegar dari kayu ulin per m3 -

3,850,000.00
27,500.00
3,877,500.00

450,000.00
1,650,000.00
195,000.00
35,000.00
2,330,000.00
6,207,500.00
kapur/lembasung per m3 -

1,870,000.00
21,650.00
1,891,650.00

450,000.00
1,650,000.00
195,000.00
35,000.00
2,330,000.00
4,221,650.00
pan kayu kapur/lembasung per m2 -

46,750.00
4,330.00
51,080.00

25,200.00
88,000.00
10,400.00
1,960.00
125,560.00
176,640.00
an kayu meranti per m2 -

46,750.00

Analisa Harga Satuan Pekerjaan Page 96


JUMLAH
Rp.
6=(3x5)
4,330.00
51,080.00

25,200.00
88,000.00
10,400.00
1,960.00
125,560.00
176,640.00
113,860.00
an kayu ulin per m2 -

96,250.00
5,500.00
101,750.00

25,200.00
88,000.00
10,400.00
1,960.00
125,560.00
227,310.00
164,530.00
ancang kayu ulin 10/10 - 2 m

77,000.00
77,000.00

162,000.00
4,400.00
520.00
6,020.00
3,366.00
176,306.00
253,306.00
ancang kayu ulin 10/10 - 4 m

154,000.00
154,000.00

162,000.00
4,400.00
520.00
6,020.00
6,732.00
179,672.00
333,672.00
ang dari kayu kapur/lembasung per m3 -

2,244,000.00
4,330.00
2,248,330.00

900,000.00
3,300,000.00
390,000.00
70,000.00
4,660,000.00
6,908,330.00
dari kayu ulin per m3 -

3,850,000.00
27,500.00
3,877,500.00

450,000.00
1,650,000.00
195,000.00

Analisa Harga Satuan Pekerjaan Page 97


JUMLAH
Rp.
6=(3x5)
35,000.00
2,330,000.00
6,207,500.00

RSNI-T-13-2002
mbuk 1 PC : 3 PB : 5 KR, Batu Pecah

396,760.00
55,718.00
558,250.00
1,010,728.00

148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,201,178.00
mbuk 1 PC : 3 PB : 5 KR, Kerikil Sungai

396,760.00
55,718.00
210,540.00
663,018.00

148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
853,468.00
mbuk 1 PC : 3 PB : 6 KR

358,540.00
50,360.50
603,166.67
1,012,067.17

148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,202,517.17
mbuk 1 PC : 4 PB : 6 KR

314,860.00
61,075.50
558,250.00
934,185.50

148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,124,635.50
ja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Koral Beton

18,200.00
2,785.90
28,233.33
49,219.23

103,500.00
2,200.00

Analisa Harga Satuan Pekerjaan Page 98


JUMLAH
Rp.
6=(3x5)
260.00
840.00
106,800.00
156,019.23
ja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Kerikil sungai

18,200.00
2,785.90
10,648.00
31,633.90

103,500.00
2,200.00
260.00
840.00
106,800.00
138,433.90
tulang 1 PC : 2 PB : 3 KR, Batu Pecah

611,520.00
57,861.00
500,500.00
1,169,881.00

148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,360,331.00
tulang 1 PC : 2 PB : 3 KR, Kerikil Sungai

611,520.00
57,861.00
188,760.00
858,141.00

148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,048,591.00
tulang 1 PC : 2 PB : 4 KR

509,600.00
48,217.50
577,500.00
1,135,317.50

148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,325,767.50
tulang 1 PC : 2 PB : 2,5 KR

640,640.00
60,004.00
449,166.67
1,149,810.67

148,500.00
27,500.00
3,250.00
11,200.00

Analisa Harga Satuan Pekerjaan Page 99


JUMLAH
Rp.
6=(3x5)
190,450.00
1,340,260.67

tulang 1 PC : 1.5 PB : 3 KR

649,740.00
45,003.00
346,500.00
1,041,243.00

148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,231,693.00
tulang 1 PC : 1.5 PB : 2,5 KR

702,520.00
50,360.50
500,500.00
1,253,380.50

148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,443,830.50
tulang 1 PC : 1 PB : 2 KR

871,780.00
39,645.50
474,833.33
1,386,258.83

148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,576,708.83
tu f'c=7,4 Mpa (K 100); slump (12 ± 2) cm; w/c = 0,87

449,540.00
66,509.54
474,833.33
8,600.00
999,482.87

148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,193,492.87
tu f'c=9,8 Mpa (K 125); slump (12 ± 2) cm; w/c = 0,78

502,320.00
63,371.57
481,012.35
8,600.00
1,055,303.92

148,500.00

Analisa Harga Satuan Pekerjaan Page 100


JUMLAH
Rp.
6=(3x5)
30,250.00
3,640.00
11,620.00
194,010.00
1,249,313.92
tu f'c=12,2 Mpa (K 150); slump (12 ± 2) cm; w/c = 0,72

544,180.00
61,152.04
483,388.89
8,600.00
1,097,320.92

148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,291,330.92
tu f'c=7,4 Mpa (K 100); slump (3-6) cm; w/c = 0,87

418,600.00
68,346.39
488,141.98
8,000.00
983,088.37

108,000.00
22,000.00
2,600.00
8,400.00
141,000.00
1,124,088.37
tu f'c=14,5 Mpa (K 175); slump (12 ± 2) cm; w/c = 0,66

593,320.00
58,167.14
489,092.59
8,600.00
1,149,179.74

148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,343,189.74

tu f'c=16,9 Mpa (K 200); slump (12 ± 2) cm; w/c = 0,61

640,640.00
55,947.61
490,043.21
8,600.00
1,195,230.82

148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,389,240.82
tu f'c=19,3 Mpa (K 225); slump (12 ± 2) cm; w/c = 0,58

675,220.00
53,421.93

Analisa Harga Satuan Pekerjaan Page 101


JUMLAH
Rp.
6=(3x5)
497,648.15
8,600.00
1,234,890.08

148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,428,900.08
tu f'c=21,7 Mpa (K 250); slump (12 ± 2) cm; w/c = 0,56

698,880.00
52,962.71
493,845.68
8,600.00
1,254,288.39

148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,448,298.39
tu f'c=24 Mpa (K 275); slump (12 ± 2) cm; w/c = 0,53

738,920.00
52,350.43
487,666.67
8,600.00
1,287,537.10

148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,481,547.10

tu f'c=26,4 Mpa (K 300); slump (12 ± 2) cm; w/c = 0,52

751,660.00
52,120.82
485,290.12
8,600.00
1,297,670.94

148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,491,680.94
tu f'c=28,8 Mpa (K 325); slump (12 ± 2) cm; w/c = 0,49

798,980.00
51,278.93
478,160.49
8,600.00
1,337,019.42

189,000.00
38,500.00
4,550.00
14,700.00
246,750.00
1,583,769.42

Analisa Harga Satuan Pekerjaan Page 102


JUMLAH
Rp.
6=(3x5)
tu f'c=31,2 Mpa (K 350); slump (12 ± 2) cm; w/c = 0,48

815,360.00
51,049.32
475,308.64
8,600.00
1,350,317.96

189,000.00
38,500.00
4,550.00
14,700.00
246,750.00
1,597,067.96
besi polos atau besi ulir

16,170.00
330.00
16,500.00

630.00
770.00
91.00
56.00
1,547.00
18,047.00
kawat baja /wiremesh

157,080.00
1,100.00
158,180.00

2,250.00
2,750.00
3,250.00
140.00
8,390.00
166,570.00
g untuk pondasi

66,000.00
6,495.00
1,060.00
73,555.00

46,800.00
28,600.00
3,380.00
3,640.00
82,420.00
155,975.00
16,484.00

g untuk sloof

74,250.00
6,495.00
1,060.00
81,805.00

46,800.00
28,600.00
3,380.00
3,640.00
82,420.00
164,225.00

Analisa Harga Satuan Pekerjaan Page 103


JUMLAH
Rp.
6=(3x5)
16,484.00

g untuk kolom

66,000.00
8,660.00
2,120.00
24,750.00
33,000.00
32,000.00
166,530.00

59,400.00
36,300.00
4,290.00
4,620.00
104,610.00
271,140.00
20,922.00

g untuk balok

66,000.00
8,660.00
2,120.00
29,700.00
33,000.00
32,000.00
171,480.00

59,400.00
36,300.00
4,290.00
4,620.00
104,610.00
276,090.00
20,922.00

g untuk lantai

66,000.00
8,660.00
2,120.00
24,750.00
33,000.00
96,000.00
230,530.00

59,400.00
36,300.00
4,290.00
4,620.00
104,610.00
335,140.00
20,922.00

g untuk dinding

49,500.00
8,660.00
2,120.00
33,000.00
33,000.00
48,000.00
64,000.00
238,280.00

Analisa Harga Satuan Pekerjaan Page 104


JUMLAH
Rp.
6=(3x5)
59,400.00
36,300.00
4,290.00
4,620.00
104,610.00
342,890.00
20,922.00

g untuk tangga

49,500.00
8,660.00
1,590.00
24,750.00
33,000.00
32,000.00
149,500.00

59,400.00
36,300.00
4,290.00
4,620.00
104,610.00
254,110.00
20,922.00

n untuk pengecoran beton

43,560.00
12,990.00
8,000.00
64,550.00

13,500.00
5,500.00
650.00
1,120.00
20,770.00
85,320.00
beton bertulang (150 kg besi + bekisting)

330,000.00
32,475.00
4,240.00
2,425,500.00
49,500.00
611,520.00
57,861.00
519,750.00
4,030,846.00

477,000.00
30,250.00
143,000.00
115,500.00
34,060.00
37,100.00
836,910.00
4,867,756.00
ton bertulang (200 kg besi + bekisting)

445,500.00
43,300.00
6,360.00
3,234,000.00
66,000.00
611,520.00

Analisa Harga Satuan Pekerjaan Page 105


JUMLAH
Rp.
6=(3x5)
57,861.00
519,750.00
4,984,291.00

508,500.00
30,250.00
171,600.00
154,000.00
41,990.00
39,620.00
945,960.00
5,930,251.00
eton bertulang (300 kg besi + bekisting)

660,000.00
86,600.00
21,200.00
4,851,000.00
99,000.00
611,520.00
57,861.00
519,750.00
247,500.00
539,000.00
320,000.00
8,013,431.00

634,500.00
30,250.00
181,500.00
231,000.00
52,390.00
49,420.00
1,179,060.00
9,192,491.00

eton bertulang (200 kg besi + bekisting)

528,000.00
69,280.00
16,960.00
3,234,000.00
66,000.00
611,520.00
57,861.00
519,750.00
231,000.00
431,200.00
256,000.00
6,021,571.00

571,500.00
30,250.00
181,500.00
154,000.00
43,290.00
44,520.00
1,025,060.00
7,046,631.00
eton bertulang (150 kg besi + bekisting)

528,000.00
69,280.00
16,960.00
2,425,500.00
49,500.00

Analisa Harga Satuan Pekerjaan Page 106


JUMLAH
Rp.
6=(3x5)
611,520.00
57,861.00
519,750.00
198,000.00
431,200.00
512,000.00
5,419,571.00

477,000.00
30,250.00
143,000.00
115,500.00
34,450.00
37,100.00
837,300.00
6,256,871.00
beton bertulang (150 kg besi + bekisting)

396,000.00
69,280.00
16,960.00
2,425,500.00
49,500.00
611,520.00
57,861.00
519,750.00
264,000.00
431,200.00
384,000.00
5,225,571.00

477,000.00
30,250.00
143,000.00
115,500.00
34,060.00
37,100.00
836,910.00
6,062,481.00
beton bertulang (200 kg besi + bekisting)

412,500.00
64,950.00
12,720.00
3,234,000.00
66,000.00
611,520.00
57,861.00
519,750.00
173,250.00
385,000.00
224,000.00
5,761,551.00

508,500.00
30,250.00
171,600.00
154,000.00
41,990.00
39,620.00
945,960.00
6,707,511.00
raktis beton bertulang (11 x 11 cm)

3,300.00
216.50
-

Analisa Harga Satuan Pekerjaan Page 107


JUMLAH
Rp.
6=(3x5)
46,200.00
9,900.00
7,280.00
642.90
5,775.00
73,314.40

16,200.00
2,200.00
2,200.00
2,200.00
780.00
1,260.00
24,840.00
98,154.40
ok beton bertulang (10 x 15 cm)

4,950.00
433.00
-
55,440.00
1,100.00
10,010.00
964.35
9,625.00
82,522.35

26,730.00
3,630.00
3,630.00
3,630.00
1,300.00
2,100.00
41,020.00
123,542.35

SNI 03-3436-2002
t fibreglass (180 x 90) cm

71,880.00
1,082.50
72,962.50

12,600.00
7,370.00
910.00
980.00
21,860.00
94,822.50
nteng glazzur

117,500.00
117,500.00

13,500.00
8,250.00
1,040.00
1,120.00
23,910.00
141,410.00
genteng glazzur

30,500.00

Analisa Harga Satuan Pekerjaan Page 108


JUMLAH
Rp.
6=(3x5)
14,560.00
3,428.80
48,488.80

36,000.00
22,000.00
2,600.00
280.00
60,880.00
109,368.80
nteng beton

80,300.00
649.50
80,949.50

18,000.00
11,000.00
1,100.00
1,400.00
31,500.00
112,449.50
teng beton

31,850.00
1,082.50
19,656.00
3,428.80
16,500.00
56,017.30

36,000.00
22,000.00
2,600.00
2,800.00
63,400.00
119,417.30
ap

138,000.00
4,330.00
142,330.00

14,940.00
27,500.00
3,250.00
1,120.00
46,810.00
189,140.00
p sirap

6,000.00
1,299.00
1,082.50
7,480.00
15,861.50

11,250.00
27,500.00
3,250.00
840.00
42,840.00
58,701.50
ng gelombang Bjls 30

45,465.00
433.00

Analisa Harga Satuan Pekerjaan Page 109


JUMLAH
Rp.
6=(3x5)
45,898.00

10,800.00
6,600.00
780.00
840.00
19,020.00
64,918.00
ng gelombang Bjls 20

28,490.00
433.00
28,923.00

10,800.00
6,600.00
780.00
840.00
19,020.00
47,943.00
bungan seng Bjls 30

52,500.00
1,299.00
74,800.00

128,599.00

13,500.00
7,700.00
1,040.00
840.00
23,080.00
151,679.00
enteng metal surya roof per m2

128,857.38
7,260.00
136,117.38

18,000.00
11,000.00
1,300.00
1,400.00
31,700.00
167,817.38
a genteng metal Surya roof per m'

83,250.00
6,050.00
7,480.00
96,780.00

18,000.00
11,000.00
1,300.00
1,400.00
31,700.00
128,480.00
enteng Metal sakura roof per m2

73,377.68
7,260.00
80,637.68

18,000.00
11,000.00

Analisa Harga Satuan Pekerjaan Page 110


JUMLAH
Rp.
6=(3x5)
1,300.00
1,400.00
31,700.00
112,337.68
a genteng metal Sakura roof per m'

83,250.00
6,050.00
7,480.00
96,780.00

18,000.00
11,000.00
1,300.00
1,400.00
31,700.00
128,480.00
sisalation per 1 M2

52,920.00
52,920.00

13,500.00
5,500.00
650.00
1,120.00
20,770.00
73,690.00

SNI 03-2838-2002
ngit lambriziring kayu, tebal 9 mm

28,050.00
216.50
28,266.50

54,000.00
88,000.00
10,400.00
4,200.00
156,600.00
184,866.50
ngit plywood ukuran (120 x 240) cm; tbl. 9 mm

57,750.00
649.50
58,399.50

9,000.00
11,000.00
1,300.00
700.00
22,000.00
80,399.50
ngit plywood ukuran (120 x 240) cm; tbl. 3 mm

22,687.50
649.50
23,337.00

9,000.00
11,000.00
1,300.00
700.00

Analisa Harga Satuan Pekerjaan Page 111


JUMLAH
Rp.
6=(3x5)
22,000.00
45,337.00
ngit plywood ukuran (60 x 120) cm; tbl. 9 mm

57,750.00
649.50
58,399.50

6,300.00
11,000.00
1,300.00
490.00
19,090.00
77,489.50
ngit plywood ukuran (60 x 120) cm; tbl. 3 mm

22,687.50
649.50
23,337.00

6,300.00
11,000.00
1,300.00
490.00
19,090.00
42,427.00

ngit teakwood ukuran (60 x 120) cm; tbl. 4 mm dan 6 mm

57,900.00
649.50
58,549.50

6,300.00
11,000.00
1,300.00
490.00
19,090.00
77,639.50
ngit lat kayu bengkirai

50,160.00
216.50
1,555.00
51,931.50

18,000.00
66,000.00
7,800.00
1,400.00
93,200.00
145,131.50
ngit lat kayu meranti

44,880.00
216.50
1,555.00
46,651.50

18,000.00
66,000.00
7,800.00
1,400.00
93,200.00
139,851.50

9 mm, rangka kayu meranti

Analisa Harga Satuan Pekerjaan Page 112


JUMLAH
Rp.
6=(3x5)

43,010.00
1,299.00
60,060.00
104,369.00

24,300.00
44,000.00
5,200.00
1,890.00
75,390.00
179,759.00
3mm, rangka kayu meranti

43,010.00
1,299.00
23,595.00
67,904.00

24,300.00
44,000.00
5,200.00
1,890.00
75,390.00
143,294.00
ngit gypsum board uk. (120 x 240) cm, tebal 9 mm

33,196.80
3,421.00
36,617.80

9,000.00
5,500.00
650.00
700.00
15,850.00
52,467.80
um

31,500.00
750.00
32,250.00

5,400.00
6,600.00
780.00
420.00
13,200.00
45,450.00
profil

21,000.00
216.50
21,216.50

4,500.00
5,500.00
650.00
420.00
11,070.00
32,286.50

SNI
duduk

Analisa Harga Satuan Pekerjaan Page 113


JUMLAH
Rp.
6=(3x5)
1,650,000.00
99,000.00
1,650,000.00

297,000.00
121,000.00
130.00
22,400.00
440,530.00
2,090,530.00
jongkok porselen

239,775.00
10,920.00
1,071.50
251,766.50

90,000.00
165,000.00
195,000.00
22,400.00
472,400.00
724,166.50
jongkok teraso

106,480.00
5,940.00
10,920.00
1,071.50
124,411.50

90,000.00
165,000.00
39,000.00
15,400.00
309,400.00
433,811.50
r

2,462,350.00
738,705.00
10,920.00
1,071.50
3,213,046.50

90,000.00
110,000.00
13,000.00
14,000.00
227,000.00
3,440,046.50
fel

1,375,000.00
165,000.00
10,920.00
1,071.50
1,551,991.50

108,000.00
159,500.00
19,500.00
14,000.00
301,000.00
1,852,991.50
andi fibreglass volume 0,30 m³

Analisa Harga Satuan Pekerjaan Page 114


JUMLAH
Rp.
6=(3x5)

500,000.00
90,000.00
590,000.00

162,000.00
297,000.00
70,200.00
15,400.00
544,600.00
1,134,600.00
andi batu bata volume 0,30 m³

221,203.13
218,400.00
32,145.00
167,706.00
99,000.00
738,454.13

540,000.00
330,000.00
39,000.00
42,000.00
951,000.00
1,689,454.13
p fiberglass

552,400.00
110,480.00
552,400.00

-
8,250.00
97,500.00
35,000.00
140,750.00
693,150.00
ton volume 1m³

1,299,447.45
2,772,000.00
132,000.00
385,000.00
318,623.05
4,907,070.50

315,000.00
495,000.00
64,350.00
69,300.00
554,400.00
#REF!
ontrol pas. batu bata ukuran (30 x 30) cm tinggi 35 cm

93,456.99
80,080.00
7,500.50
16,940.00
24,640.00
6,429.00
229,046.49

288,000.00
111,650.00
195.00
2,240.00

Analisa Harga Satuan Pekerjaan Page 115


JUMLAH
Rp.
6=(3x5)
402,085.00
631,131.49
ontrol pas. batu bata ukuran (45 x 45) cm tinggi 60 cm

161,132.70
140,140.00
13,929.50
4,840.00
40,040.00
9,643.50
369,725.70

127,800.00
52,030.00
6,110.00
9,940.00
195,880.00
565,605.70
ontrol pas. batu bata ukuran (60 x 60) cm tinggi 65 cm

239,121.09
207,480.00
19,715.60
7,986.00
74,690.00
12,858.00
561,850.69

194,400.00
79,200.00
9,360.00
15,120.00
14,000.00
312,080.00
873,930.69
C tipe AW Ø ½"

6,000.00
1,750.00
7,750.00

3,240.00
6,600.00
780.00
252.00
10,872.00
18,622.00
C tipe AW Ø ¾"

7,200.00
2,100.00
9,300.00

3,240.00
6,600.00
780.00
252.00
10,872.00
20,172.00

C tipe AW Ø 1"

9,990.00
2,913.75
12,903.75

3,240.00

Analisa Harga Satuan Pekerjaan Page 116


JUMLAH
Rp.
6=(3x5)
6,600.00
780.00
252.00
10,872.00
23,775.75
C tipe AW Ø 1½"

18,360.00
5,355.00
23,715.00

3,240.00
6,600.00
780.00
252.00
10,872.00
34,587.00
C tipe AW Ø 2"

23,970.00
6,991.25
30,961.25

4,860.00
9,900.00
1,170.00
378.00
16,308.00
47,269.25
C tipe AW Ø 2½"

34,350.00
10,018.75
44,368.75

3,240.00
6,600.00
780.00
252.00
10,872.00
55,240.75
C tipe AW Ø 3"

41,940.00
12,232.50
54,172.50

7,290.00
14,850.00
1,755.00
574.00
24,469.00
78,641.50
C tipe AW Ø 4"

65,100.00
18,987.50
84,087.50

7,290.00
14,850.00
1,755.00
574.00
24,469.00
108,556.50
uci piring satinless steel

Analisa Harga Satuan Pekerjaan Page 117


JUMLAH
Rp.
6=(3x5)
532,400.00
186,340.00
718,740.00

2,700.00
33,000.00
3,900.00
210.00
39,810.00
758,550.00
Ø ¾" atau ½" Biasa

11,000.00
75.00
11,075.00

900.00
11,000.00
1,300.00
700.00
13,900.00
24,975.00
Ø ¾" atau ½" stanlis

88,000.00
75.00
88,075.00

900.00
11,000.00
1,100.00
700.00
13,700.00
101,775.00
rain

39,930.00
39,930.00

900.00
11,000.00
977,008.50
13,312.50
32,500.00
#REF!

Revisi SNI T-16-2002


atap baja

19,030.00
1,936.00
20,966.00

5,400.00
660.00
780.00
42.00
6,882.00
27,848.00
fil

19,895.00
19,895.00

5,400.00

Analisa Harga Satuan Pekerjaan Page 118


JUMLAH
Rp.
6=(3x5)
6,600.00
780.00
420.00
13,200.00
33,095.00
erjaan perakitan

9,900.00
3,990.00
13,890.00

9,000.00
11,000.00
130.00
700.00
448.80
21,278.80
35,168.80
elasan dengan las listrik

1,188.00
297.00
159.60
1,644.60

360.00
220.00
26.00
28.00
953.70
1,587.70
3,232.30
lung (rolling door) besi

259,500.00
259,500.00

108,000.00
132,000.00
15,600.00
840.00
256,440.00
515,940.00
at (folding door)

2,462,400.00
2,462,400.00

39,600.00
48,400.00
5,720.00
3,080.00
96,800.00
2,559,200.00
oor alumunium

1,271,105.00
1,271,105.00

90,000.00
110,000.00
13,000.00
7,000.00
220,000.00
1,491,105.00
umunium

Analisa Harga Satuan Pekerjaan Page 119


JUMLAH
Rp.
6=(3x5)
732,100.00
732,100.00

94,500.00
115,500.00
13,650.00
728.00
224,378.00
956,478.00
umunium 4 "

219,615.00
20,000.00
4,791.60
244,406.60

3,870.00
4,730.00
559.00
294.00
9,453.00
253,859.60
Alumunium SNI 7393 : 2008

878,460.00
157,500.00
21,562.20
1,057,522.20

7,650.00
9,350.00
1,170.00
700.00
18,870.00
1,076,392.20
Rangka Alumunium SNI DT 90-0014-2007

681,305.63
119,437.50
21,562.20
822,305.33

7,650.00
9,350.00
1,170.00
700.00
18,870.00
841,175.33
si

19,166.67
87,530.68
106,697.35

150,300.00
183,700.00
21,710.00
11,620.00
367,330.00
474,027.35
armonika

20,570.00
433.00
3,366.00

Analisa Harga Satuan Pekerjaan Page 120


JUMLAH
Rp.
6=(3x5)
24,369.00

9,000.00
11,000.00
1,300.00
70.00
21,370.00
45,739.00
yamuk

20,570.00
42,213.60
35,910.85
98,694.45

4,950.00
6,050.00
715.00
38.50
11,753.50
#REF!
nako & tralis

190,300.00
622.00
615.00
191,537.00

18,000.00
22,000.00
2,600.00
140.00
42,740.00
234,277.00
atar seng BJLS 30

57,750.00
466.50
35,530.00
93,746.50

18,000.00
44,000.00
3,250.00
1,400.00
66,650.00
160,396.50
miring seng BJLS 30

57,750.00
466.50
35,530.00
7,260.00
101,006.50

13,500.00
44,000.00
3,250.00
175.00
60,925.00
161,931.50
½ lingkaran Ø 10 cm, seng BJLS 30

57,750.00
3,110.00
12,300.00
73,160.00

Analisa Harga Satuan Pekerjaan Page 121


JUMLAH
Rp.
6=(3x5)

13,500.00
27,500.00
3,250.00
175.00
44,425.00
117,585.00

½ lingkaran Ø 10 cm, seng BJLS 20

16,500.00
311.00
12,300.00
29,111.00

13,500.00
27,500.00
3,250.00
175.00
44,425.00
73,536.00
dari PVC

28,750.00
18,700.00
47,450.00

27,000.00
55,000.00
6,500.00
2,100.00
90,600.00
138,050.00

tanam kwalitas baik

211,750.00
211,750.00

5,400.00
66,000.00
7,800.00
420.00
79,620.00
291,370.00
tanam biasa

50,000.00
128,775.00

450.00
55,000.00
650.00
35.00
56,135.00
184,910.00
tanam kamar mandi

72,600.00
72,600.00

450.00
55,000.00
650.00

Analisa Harga Satuan Pekerjaan Page 122


JUMLAH
Rp.
6=(3x5)
350.00
56,450.00
129,050.00
l pintu

37,000.00
37,000.00

1,350.00
16,500.00
1,950.00
105.00
19,905.00
56,905.00
l jendela kupu-kupu

22,000.00
22,000.00

900.00
11,000.00
1,300.00
70.00
13,270.00
35,270.00

ngin

19,800.00
19,800.00

1,350.00
16,500.00
1,950.00
105.00
19,905.00
39,705.00
selot

16,500.00
16,500.00

1,800.00
22,000.00
2,600.00
140.00
26,540.00
43,040.00
ngan pintu / door holder

330,000.00
330,000.00

4,500.00
55,000.00
6,500.00
350.00
66,350.00
396,350.00
ah

137,500.00
137,500.00

4,500.00

Analisa Harga Satuan Pekerjaan Page 123


JUMLAH
Rp.
6=(3x5)
55,000.00
6,500.00
350.00
66,350.00
203,850.00

27,500.00
27,500.00

9,000.00
1,100.00
1,300.00
70.00
11,470.00
38,970.00

ntu dorong

2,298,600.00
2,298,600.00

5,400.00
66,000.00
7,800.00
420.00
79,620.00
2,378,220.00
os; tebal 3 mm

124,410.00
124,410.00

1,350.00
16,500.00
1,950.00
105.00
19,905.00
144,315.00

os; tebal 5 mm

190,300.00
190,300.00

1,350.00
16,500.00
1,950.00
105.00
19,905.00
210,205.00
ben; tebal 3 mm

188,870.00
188,870.00

1,350.00
16,500.00
1,950.00
105.00
19,905.00
208,775.00
ben; tebal 5 mm

261,580.00
196,432.50

Analisa Harga Satuan Pekerjaan Page 124


JUMLAH
Rp.
6=(3x5)
742.50
9,075.00
1,072.50
57.75
10,947.75
207,380.25
tebal 3 mm

149,380.00
149,380.00

1,350.00
16,500.00
1,950.00
105.00
19,905.00
169,285.00
tebal 5 mm

245,960.00
245,960.00

1,350.00
16,500.00
1,950.00
105.00
19,905.00
265,865.00
min; tebal 3 mm

248,930.00
248,930.00

1,350.00
16,500.00
1,950.00
105.00
19,905.00
268,835.00
tri lokal

1,121,450.00
1,121,450.00

1,121,450.00

12,870.00
7,865.00
929.50
1,001.00
22,665.50
1,144,115.50
eramik ukuran 60 x 60 cm

465,850.00
17,472.00
4,821.75
21,450.00
509,593.75

63,000.00
38,500.00
4,550.00
4,200.00
110,250.00
619,843.75

Analisa Harga Satuan Pekerjaan Page 125


JUMLAH
Rp.
6=(3x5)

eramik ukuran 40 x 40 cm

77,000.00
17,836.00
4,821.75
21,450.00
121,107.75

63,000.00
38,500.00
4,550.00
4,200.00
110,250.00
231,357.75
eramik ukuran 30 x 30 cm

66,000.00
18,200.00
4,821.75
24,750.00
113,771.75

63,000.00
38,500.00
4,550.00
4,200.00
110,250.00
224,021.75
0 x 20 cm per 1 M2

71,500.00
18,928.00
4,500.30
24,750.00
119,678.30

63,000.00
38,500.00
4,550.00
4,200.00
110,250.00
229,928.30
keramik ukuran 20 x 20 cm

71,500.00
16,926.00
1,928.70
32,010.00
122,364.70

81,000.00
49,500.00
5,850.00
6,300.00
142,650.00
265,014.70
keramik ukuran 20 x 25 cm

77,000.00
16,926.00
1,928.70
32,010.00
127,864.70

81,000.00
49,500.00

Analisa Harga Satuan Pekerjaan Page 126


JUMLAH
Rp.
6=(3x5)
5,850.00
6,300.00
142,650.00
270,514.70
porselin 11 x 11 cm

99,825.00
16,926.00
1,928.70
24,750.00
143,429.70

90,000.00
55,000.00
6,500.00
7,000.00
158,500.00
301,929.70

amik ukuran 10 x 20 cm

156,350.00
2,074.80
321.45
412.50
159,158.75

8,100.00
9,900.00
1,170.00
700.00
19,870.00
179,028.75
bin granito ukuran 40 x 40 cm

279,600.00
17,836.00
4,821.75
21,450.00
323,707.75

22,500.00
13,750.00
1,690.00
1,820.00
39,760.00
363,467.75
bin granito ukuran 40x 40 cm (motif khusus)

1,464,100.00
17,836.00
4,821.75
21,450.00
1,508,207.75

22,500.00
13,750.00
1,690.00
1,820.00
39,760.00
1,547,967.75
armer ukuran 40 x 40 cm

213,000.00
17,836.00
4,821.75

Analisa Harga Satuan Pekerjaan Page 127


JUMLAH
Rp.
6=(3x5)
21,450.00
257,107.75

63,000.00
38,500.00
4,550.00
4,900.00
110,950.00
368,057.75
batu alam

246,235.00
21,385.00
3,750.25
271,370.25

63,000.00
38,500.00
4,550.00
4,900.00
110,950.00
382,320.25
u ukuran 2 x 10 cm

5,610.00
1,555.00
7,165.00

10,800.00
13,200.00
1,560.00
840.00
26,400.00
33,565.00
otif M2

225,000.00
25,771.20
2,464.45
253,235.65

54,000.00
165,000.00
11,700.00
8,400.00
239,100.00
492,335.65

SNI
mukaan cat tembok lama 1 M2

665.00
665.00

13,500.00
350.00
13,850.00
14,515.00

1,000.00
1,000.00

Analisa Harga Satuan Pekerjaan Page 128


JUMLAH
Rp.
6=(3x5)
13,500.00
350.00
13,850.00
14,850.00

1,000.00
1,000.00

13,500.00
350.00
13,850.00
14,850.00

sok 1 m² kayu

1,760.00
506.00
466.00
2,732.00

3,600.00
4,400.00
520.00
350.00
8,870.00
11,602.00
ayu lama

3,300.00
4,114.00
8,041.00
15,455.00

6,300.00
8,250.00
975.00
350.00
15,875.00
31,330.00
ayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)

4,840.00
3,300.00
4,114.00
12,298.00
24,552.00

6,300.00
990.00
780.00
350.00
8,420.00
32,972.00
ayu baru (1 lps plamir, 1 lps cat dsr, 3 lps cat penutup)

4,840.00
3,300.00
4,114.00
16,555.00
28,809.00

6,300.00
11,550.00
520.00
350.00

Analisa Harga Satuan Pekerjaan Page 129


JUMLAH
Rp.
6=(3x5)
18,720.00
47,529.00
engan teak oil per 1 M2

12,024.00
12,024.00

3,600.00
6,600.00
2,080.00
350.00
12,630.00
24,654.00
u dengan politur

9,460.00
7,425.00
10,000.00
26,885.00

6,600.00
2,080.00
350.00
9,030.00
35,915.00
u dengan cat residu

3,360.00
3,360.00

9,000.00
840.00
9,840.00
13,200.00
u dengan vernis

7,425.00
1,100.00
500.00
176.00
9,201.00

14,400.00
17,600.00
2,080.00
350.00
34,430.00
43,631.00
embok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)

836.00
2,420.00
6,006.00
9,262.00

1,800.00
6,930.00
819.00
350.00
9,899.00
19,161.00
embok lama (1 lps cat dsr, 2 lps cat penutup)

4,400.00
30,888.00
35,288.00

Analisa Harga Satuan Pekerjaan Page 130


JUMLAH
Rp.
6=(3x5)
1,800.00
6,930.00
819.00
350.00
9,899.00
45,187.00
ai cat khusus atap per m2

40,425.00
40,425.00

1,500.30
550.00
6,500.00
238.00
8,788.30
49,213.30
per 1 m2

111,840.00
7,700.00
119,540.00

1,800.00
22,000.00
260.00
350.00
24,410.00
143,950.00
an baja dengan meni besi

2,420.00
176.00
2,596.00

1,800.00
22,000.00
2,600.00
1,400.00
27,800.00
30,396.00
an baja dengan meni besi dan perancah

2,420.00
176.00
3,300.00
5,896.00

22,500.00
24,750.00
2,925.00
1,050.00
51,225.00
57,121.00

Analisa Harga Satuan Pekerjaan Page 131


I.1 Rangka Holow m2 #N/A
0.8000 kg Profil holow #N/A #N/A
0.1100 kg Paku sekrup #N/A #N/A
0.1500 kg Kawat penggantung #N/A #N/A
0.1000 oh Pekerja #N/A #N/A
0.05 oh Tukang #N/A #N/A
0.005 oh Kepala tukang #N/A #N/A
0.0050 oh Mandor #N/A #N/A
DINAS PEKERJAAN UMUM
KABUPATEN BULUNGAN

DAFTAR HARGA SATUAN BAHAN DAN UPAH


TAHUN 2014

HARGA HARGA HARGA HARGA HARGA HARGA HARGA HARGA


SATUAN 2012 SATUAN SATUAN SATUAN SATUAN SATUAN SATUAN
Rp. BUL;UNGAN Rp. Rp. Rp. Rp. Rp. Rp.
NO. URAIAN SATUAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tjg.Selor Tg. Palas Tengah Sekatak Tg. Palas timur Peso Hilir PESO BUNYU
Tjg.Palas Tg.Palas Utara Tg. Palas Barat
1 2 3 4 5 6 7 8 9 10 11

A. UPAH TENAGA :
Tukang
1 Tukang kayu hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000
2 Tukang batu hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000
3 Tukang besi hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000
4 Tukang las hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000
5 Tukang cat hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000
6 Tukang plitur hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000
7 Tukang bor hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000
8 Tukang listrik hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000
9 Tukang pipa ledeng hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000
10 Tukang kapur hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000
11 Tukang gali hari 110,000 ### 110,000 110,000 110,000 110,000 110,000 110,000
Kepala Tukang
12 Kepala tukang kayu hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000
13 Kepala tukang batu hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000
14 Kepala tukang besi hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000
15 Kepala tukang las hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000
16 Kepala tukang cat hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000
17 Kepala tukang plitur hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000
18 Kepala tukang bor hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000
Pekerja
19 Mandor hari 140,000 ### 140,000 140,000 140,000 140,000 140,000 140,000
20 Sopir hari 120,000 ### 120,000 120,000 120,000 120,000 120,000 120,000
21 Kernet / pembantu sopir hari 90,000 ### 90,000 90,000 90,000 90,000 90,000 90,000
22 Mekanik terlatih hari 130,000 ### 130,000 130,000 130,000 130,000 130,000 130,000
Operator
23 Operator tak terlatih hari 85,000 ### 85,000 85,000 85,000 85,000 85,000 85,000
24 Operator terlatih hari 120,000 ### 120,000 120,000 120,000 120,000 120,000 120,000
25 Operator semi terlatih hari 100,000 ### 100,000 100,000 100,000 100,000 100,000 100,000
Buruh
26 Buruh terlatih hari 90,000 ### 90,000 90,000 90,000 90,000 90,000 90,000
27 Buruh semi terlatih hari 85,000 ### 85,000 85,000 85,000 85,000 85,000 85,000
28 Buruh tak terlatih hari 80,000 ### 80,000 80,000 80,000 80,000 80,000 80,000

B. BAHAN:
Kelompok Material Alam :
Tanah
1 Tanah urug m³ 61,875 ### 61,900 61,900 61,900 61,900 61,900 330,000
2 Tanah urug Pilihan m³ 66,000 ### 66,000 66,000 66,000 66,000 66,000 412,500
Pasir dan Tanah
1 Pasir urug m³ 100,800 ### 198,000 220,000 110,000 100,800 187,000 385,000
2 Pasir batu (sirtu) m³ 121,000 198,000 275,000 137,500 121,000 149,100 465,900
3 Pasir pasang / Pasir Beton m³ 107,150 ### 267,630 242,000 310,640 168,000 190,400 453,200
4 Tanah Timbunan m3 82,500 82,500 82,500 82,500 91,667 110,000 110,000
5 Tanah Timbunan Pilihan m3 140,000 90,750 90,750 90,750 100,833 121,000 121,000

Batu
6 Batu gunung m³ 392,000 297,000 278,438 625,000 278,438 371,250 696,900
7 Batu belah 15/20 m³ 431,200 ### 459,900 429,000 681,400 431,200 574,900 766,600
8 Batu kali besar m³ 177,760 ### 177,760 177,760 381,260 177,760 192,500 495,000
9 Batu kali kecil m³ 177,760 ### 177,760 177,760 381,260 177,760 192,500 495,000
10 Kerikil sungai m³ 242,000 ### 165,000 242,000 357,280 242,000 242,000 495,000
11 Batu teraso kg 13,600 ### 13,900 14,000 14,000 14,100 14,300 14,200
12 Batu granito kg 13,600 ### 13,900 14,000 14,000 14,100 14,300 14,200
13 Abu Batu m³ 641,667 684,400 440,000 891,667 703,450 1,650,000 1,265,000
Koral Sikat Zak 75,000 80,000 75,000 118,500 75,000 100,000 133,300
Batu Pecah Tangan
14 Batu pecah tangan 2-3 cm (split) m³ 595,833 ### 385,000 396,000 845,833 412,500 1,595,000 1,210,000
15 Batu pecah tangan 3-5 cm m³ 595,833 385,000 396,000 845,833 412,500 1,595,000 1,210,000
16 Batu pecah tangan 5-7 cm m³ 595,833 385,000 396,000 845,833 412,500 1,595,000 1,210,000
Batu Pecah Mesin
17 Batu pecah mesin 0,5-1 cm m³ 641,667 440,000 440,000 891,667 703,450 1,650,000 1,265,000
18 Batu pecah mesin 1-2 cm m³ 641,667 440,000 440,000 891,667 703,450 1,650,000 1,265,000
19 Batu pecah mesin 2-3 cm m³ 641,667 440,000 440,000 891,667 703,450 1,650,000 1,265,000
20 Batu pecah mesin 3-5 cm m³ 641,667 440,000 440,000 891,667 703,450 1,650,000 1,265,000
Batu Tempel
21 Batu Tempel (muka segi 6) tebal 10 cm buah
21 Batu Tempel Palimanan Hijau m² 223,850 227,100 227,400 227,900 227,600 228,100 228,000
22 Batu Tempel Palimanan Kuning m² 266,200 270,000 270,500 271,100 270,700 271,300 271,200
23 Batu Tempel (Tidak Beraturan) Kecil m² 199,650 202,500 202,800 203,300 203,000 203,500 203,400
24 Batu Tempel (Tidak Beraturan) Besar m² 199,650 202,500 202,800 203,300 203,000 203,500 203,400
25 Batu Candi Tempel 20/20, 5/20 m² 146,410 148,500 148,800 149,100 148,900 149,200 149,100
Batu Bata
26 Batu bata ukuran 8 x 8 x 16 cm buah 990 1,100 1,300 1,200 1,320 1,200 1,870
27 Batu bata bali buah 1,175 ### 1,200 1,300 1,400 1,400 1,500 2,200
28 Batako buah 2,750 ### 3,300 3,300 4,400 4,400 3,520 ###
29 Kapur pasang m3 232,925 251,600 270,200 279,500 279,500 298,100 298,100
Kelompok Kayu & Langit-langit
30 Kayu Jati
a. Kayu Jati Klas 2 : Balok 8/15 m³ 14,241,700 14,448,600 14,456,400 14,491,600 14,475,900 14,511,100 14,511,100
b. Kayu Jati Klas 3 : Balok 8/15 m³ 14,241,700 14,448,600 14,456,400 14,491,600 14,475,900 14,511,100 14,511,100
c. Papan kayu jati m³ 14,241,700 14,448,600 14,456,400 14,491,600 14,475,900 14,511,100 14,511,100
31 Kayu Kamper
a. Kayu Kamper : Balok 8/15 m³ 2,090,000 1,811,300 1,741,700 1,741,700 1,741,700 1,811,300 2,786,700
b. Kayu Kamper : 5/7 & 4/6 m³ 2,090,000 1,811,300 1,741,700 1,741,700 1,741,700 1,811,300 2,786,700
c. Kayu Kamper : 3/4 & 3/5 m³ 2,090,000 1,811,300 1,741,700 1,741,700 1,741,700 1,811,300 2,786,700
d. Kayu Kamper : 2/3 m³ 2,090,000 1,811,300 1,741,700 1,741,700 1,741,700 1,811,300 2,786,700
e. Papan kamper m³ 2,090,000 1,811,300 1,741,700 1,741,700 1,741,700 1,811,300 2,786,700
32 Kayu Bangkirai
a. Kayu Bangkirai : Balok 10/10 m³ 2,035,000 ### 1,763,700 1,695,800 2,200,000 1,540,000 1,763,700 3,080,000
b. Kayu Bangkirai : Balok 8/15 m³ 2,090,000 ### 1,811,300 1,741,700 2,200,000 1,741,700 1,811,300 3,080,000
c. Kayu Bangkirai : 5/7 & 4/6 m³ 2,090,000 ### 1,811,300 1,741,700 2,200,000 1,650,000 1,811,300 3,080,000
d. Kayu Bangkirai : 3/4 & 3/5 m³ 2,310,000 ### 2,002,000 1,925,000 2,200,000 1,925,000 2,002,000 3,080,000
e. Kayu Bangkirai : 2/3 m³ 2,310,000 ### 2,002,000 1,925,000 2,200,000 1,925,000 2,002,000 3,080,000
f. Papan bangkirai ( 2 x 20 x 400 ) m³ 2,090,000 ### 1,811,300 1,741,700 2,200,000 1,650,000 1,811,300 3,080,000
g. Papan bangkirai ( 2 x 25 x 400 ) m³ 2,090,000 ### 1,811,300 1,741,700 2,200,000 1,741,700 1,811,300 3,080,000
h Papan bangkirai ( 2 x 30 x 400 ) m³ 2,090,000 ### 1,811,300 1,741,700 2,200,000 1,741,700 1,811,300 3,080,000
33 Kayu Kruing / Lembasung
a. Kayu Kruing : Balok 8/15 m³ 1,870,000 1,620,700 1,558,300 2,200,000 1,558,300 1,620,700 1,980,000
b. Kayu Kruing : 5/7 & 4/6 m³ 1,870,000 1,620,700 1,558,300 2,200,000 1,558,300 1,620,700 1,980,000
c. Kayu Kruing : 3/4 & 3/5 m³ 1,870,000 1,620,700 1,558,300 2,200,000 1,558,300 1,620,700 1,980,000
d. Kayu Kruing : 2/3 m³ 1,870,000 1,620,700 1,558,300 2,200,000 1,558,300 1,620,700 1,980,000
34 Kayu Meranti
a. Kayu Kalimantan ( Meranti ) : Balok 10/1 m³ 1,870,000 ### 1,726,200 1,654,200 1,650,000 1,320,000 1,726,200 2,589,200
b. Kayu Kalimantan ( Meranti ) : Balok 8/15 m³ 1,870,000 ### 1,726,200 1,654,200 1,650,000 1,654,200 1,726,200 2,589,200
c. Kayu Kalimantan ( Meranti ) 5/7 & 4/6 m³ 1,870,000 ### 1,726,200 1,654,200 1,650,000 1,654,200 1,726,200 2,589,200
d. Kayu Kalimantan ( Meranti ) : 3/4 & 3/5 m³ 1,870,000 ### 1,726,200 1,654,200 1,650,000 1,654,200 1,726,200 2,589,200
e. Kayu Kalimantan ( Meranti ) : 2/3 m³ 1,870,000 ### 1,726,200 1,654,200 1,650,000 1,654,200 1,726,200 2,589,200
f. Papan Meranti ( 2 x 20 x 400 ) m³ 1,870,000 ### 1,726,200 1,654,200 1,650,000 1,320,000 1,726,200 2,589,200
g Papan Meranti ( 2 x 25 x 400 ) m³ 1,870,000 ### 1,726,200 1,654,200 1,650,000 1,654,200 1,726,200 2,589,200
35 Kayu Ulin
a Kayu Ulin : 5/10 m³ 3,850,000 ### 3,850,000 3,300,000 3,850,000 3,080,000 3,300,000 6,050,000
b. Kayu Ulin : 10/10 m³ 3,850,000 ### 3,850,000 3,575,000 3,850,000 3,575,000 3,850,000 6,050,000
c. Kayu Ulin : 12/12 m³ 3,850,000 ### 3,850,000 3,575,000 3,850,000 3,575,000 3,850,000 6,050,000
d Kayu Ulin : 15/15 m³ 4,400,000 ### 4,400,000 3,575,000 3,850,000 3,575,000 3,850,000 6,050,000
e. Kayu Ulin : 20/20 m³ 6,050,000 ### 5,610,000 4,675,000 ### 4,675,000 5,610,000 6,050,000
f Papan Ulin ( 2,5 x 20 x 400 ) m³ 3,850,000 ### 3,850,000 3,575,000 3,850,000 3,080,000 4,400,000 6,820,000
g Papan Ulin ( 5 x 20 x 400 ) m³ 4,950,000 ### 4,950,000 3,575,000 3,850,000 3,575,000 4,400,000 8,250,000
h Papan Ulin ( 9 x 25 x 400 ) m³ 4,950,000 ### 5,610,000 4,400,000 ### 4,400,000 4,400,000 8,250,000
i Papan Ulin ( 2,5 x 20 x 200 ) m³ 3,850,000 ### 3,850,000 3,575,000 3,850,000 3,080,000 4,400,000 6,820,000

Page 133
Kayu Begesting, Perancah, Dolken
36 Kayu Rawa (merah) m³ 990,000 1,100,000 1,430,000 1,100,000 1,320,000 1,650,000 1,440,000
37 Papan Cetak ( kayu rawa ) uk 2 x 20 x 400 m³ 990,000 1,100,000 1,430,000 1,100,000 1,320,000 1,650,000 1,440,000
38 Kayu bakar m³ 49,500 ### 49,500 49,500 ### 49,500 49,500 ###
39 Kayu stoot ( bambu ), 5 m btg 5,500 5,000 4,800 4,800 4,800 5,000 8,000
40 Kayu perancah 4m btg 16,000 ### 14,500 13,800 13,800 13,800 14,500 23,300
41 Kayu perancah m³ 1,650,000 ### 1,650,000 1,650,000 1,650,000 1,650,000 1,650,000 2,420,000
42 Dolken Ø 5 kayu rawa (merah) btg 17,600 16,000 15,200 15,200 15,200 16,000 33,000
43 Dolken Ø 12 kayu rawa (merah) btg 33,000 30,000 28,500 28,500 28,500 30,000 48,000
Lain-lain
44 Ijuk kg 31,600 32,100 32,100 32,200 32,100 32,200 32,200
45 Pintu Kayu panil ukuran 80 x 220 cm buah 732,050 742,700 743,100 744,900 744,100 745,900 745,900
Teakwood
46 Teakwood tebal 3 mm lbr 133,100 135,000 135,100 135,400 135,300 135,600 135,600
47 Teakwood tebal 3 mm uk. 90 x 120 cm lbr 93,200 94,600 94,600 94,800 94,700 95,000 95,000
48 Teakwood tebal 4 mm uk. 90 x 210 cm lbr 113,100 114,700 114,800 115,100 115,000 115,200 115,200
49 Teakwood tebal 4 mm uk. 120 x 240 cm lbr 154,400 156,600 156,700 157,100 156,900 157,300 157,300
Multiplek
50 Multipleks 9 mm lbr 154,000 156,200 156,300 156,700 156,500 156,900 156,900
51 Multipleks 12 mm lbr 203,500 206,500 206,600 207,100 206,800 207,300 207,300
Board Pabrikasi
52 Hardpleks 0,35 mm 1,22 x 2,44 m, kalsiboard (tahan api) lbr 81,200 82,400 82,400 82,600 82,500 82,700 82,700
53 Gipsum Board lbr 91,200 92,525 92,600 92,800 92,700 92,925 ###
54 Asbes Datar uk. 100x100 lbr 17,300 17,600 17,600 17,600 17,600 17,600 17,600
55 GRC Board lbr 76,230 77,300 77,400 77,600 77,500 77,700 77,700
56 Eternit m² 20,000 20,300 20,300 20,400 20,300 20,400 20,400
Plywood
57 Plywood 3 mm uk. 90 x 220 cm lbr 60,500 61,400 61,400 77,000 61,500 61,600 61,600
58 Plywood 4 mm lbr 68,200 69,200 69,200 69,400 69,300 69,500 69,500
59 Plywood 9 mm uk. 120 x 240 mm lbr 154,000 156,200 156,300 156,700 156,500 156,900 156,900
List Kayu Profil
60 List Kayu Profil 1/3 m' 13,300 13,500 13,600 13,500 13,600 13,600 13,700
61 List Kayu Profil 1/5 m' 20,000 20,300 20,400 20,400 20,400 20,400 20,500
62 List Kayu Profil 2/4 m' 20,000 20,300 20,400 20,400 20,400 20,400 20,500
List Gipsum m' 30,000 30,500 30,600 30,500 30,600 30,600 30,800
Tepung Gipsum Kg 5,000 5,100 5,100 5,100 5,100 5,100 5,100
63 Triplek 4 mm uk 120 x 240 lbr 73,200 74,300 74,700 74,500 74,700 74,700 75,200
Kelompok Fiber, Besi& Baja
Paku & Baut
64 Paku biasa kg 21,650 22,000 22,000 22,000 22,000 22,800 19,800
65 Paku ulin kg 27,500 28,050 28,600 29,700 ### 30,800 29,700
66 Paku besi kg 31,100 31,500 31,600 31,700 31,700 31,700 31,800
67 Paku atap metal kg 30,250 30,800 30,900 31,200 31,200 33,600 30,800
68 Paku seng gelombang kg 25,300 25,800 25,900 26,100 27,500 28,100 27,500
69 Baut Ø 1/2 - 45 cm buah 33,000 33,400 33,800 34,600 33,900 35,500 33,900
70 Mur Baut Panjang buah 26,400 26,800 27,100 27,700 27,100 28,400 27,100
71 Mur Baut Pendek buah 24,200 24,500 24,800 25,400 24,900 26,100 24,900
Besi
72 Besi beton polos kg 15,400 15,700 16,800 21,300 19,000 22,400 21,300
73 Besi beton ulir kg 16,500 16,800 18,000 22,800 20,400 24,000 22,800
74 Besi beton U-24 kg 15,400 15,700 16,800 21,300 19,000 22,400 21,300
75 Besi beton U-39 kg 16,720 17,000 18,200 23,100 20,700 24,300 23,100
76 Besi Strip ( tebal 5 mm, lebar 5 cm ) kg 24,600 25,000 25,000 25,000 25,000 25,100 25,100
77 Besi Strip ( tebal 3 mm - 12 m ) lembar 20,000 20,300 20,300 20,400 20,300 20,400 20,400
78 Besi klam U buah 18,700 19,250 19,800 20,900 ### 22,000 19,800
79 Besi hollow 4 x 4 cm tebal 1.2 mm m' 38,500 39,100 39,100 39,200 39,100 39,200 39,200
80 Kanopi ( Besi Tempa ) m² 1,064,800 1,080,300 1,081,900 1,084,000 1,082,700 1,085,100 1,084,800
Pagar BRC
81 Pagar BRC Galvanis 90 x 240 cm lbr 299,475 304,900 326,700 413,800 370,300 435,600 413,800
82 Pagar BRC Galvanis 120 x 240 cm lbr 366,025 372,700 399,300 505,800 452,500 532,400 505,800
83 Tiang BRC Galvanis panjang 120 cm btg 106,500 108,400 116,200 147,200 131,700 154,900 147,200
84 Tiang BRC Galvanis panjang 150 cm btg 126,400 128,700 137,900 174,700 156,300 183,900 174,700
Pintu
85 Pintu PVC (lengkap; kusen + daun) unit 385,000 392,000 420,000 532,000 476,000 560,000 532,000
86 Rolling Door Besi m² 259,500 264,200 283,100 358,600 320,800 377,500 358,600
87 Folding Door ( 3x2,5 ) m² 2,462,400 2,507,200 2,686,300 3,402,600 3,044,400 3,581,700 3,402,600
88 Rell Pintu Dorong / 5m' Bh 2,298,600 2,340,400 2,507,600 3,176,200 2,841,900 3,343,400 3,176,200
Kawat
89 Kawat duri roll 90,750 104,400 105,300 106,200 107,100 108,900 105,300
90 Kawat duri kg 10,100 11,600 11,700 11,800 11,900 12,100 11,700
91 Kawat harmonika 4 x 4 cm m² 18,700 21,500 21,700 21,900 22,100 22,400 21,700
92 Kawat Ayam m² 17,600 20,200 20,400 20,600 22,000 21,100 20,400
93 Kawat beton (bindrad) kg 22,000 25,300 27,500 34,900 39,000 44,600 25,400
94 Kawat bronjong Q 4 mm kg 34,100 39,200 39,600 39,900 40,200 40,900 39,600
95 Kawat galvanis Q 1 mm kg 70,500 81,100 81,800 82,500 83,200 84,600 81,800
96 Kawat Las kg 33,000 38,000 38,300 38,600 38,900 39,600 38,300
97 Kawat Las Listrik RD 26 kg 29,700 34,200 34,500 34,700 35,000 35,600 34,500
98 Kawat Las Listrik RB 26 kg 154,000 177,100 178,600 180,200 181,700 184,800 178,600
Baja
99 Bondex ( plat beton ) m² 163,600 166,000 166,200 166,500 166,300 166,700 166,700
100 Wiremesh M6 m² 105,500 107,000 107,200 107,400 107,300 107,500 107,500
101 Baja plat lembar 425,900 432,100 432,700 433,500 433,000 434,100 433,900
102 Baja siku L 50.50.4 kg 15,000 15,200 15,200 15,300 15,300 15,300 15,300
103 Baja IWF kg 17,300 17,600 17,600 17,600 17,600 17,600 17,600
104 Pengadaan rangka baja ringan m² 308,000 312,500 312,900 313,500 313,100 313,900 313,800

Acesories Daun Pintu & Daun Jendela


Lain-lain
105 Door closer 137,500 158,100 159,500 160,900 162,300 163,600 165,000
106 Door stoper 27,500 31,600 31,900 32,200 32,500 32,700 33,000
Kunci tanam
Kunci tanam kwalitas baik buah 211,750 243,500 245,600 247,800 249,900 252,000 254,100
Kunci tanam biasa buah 50,000
Kunci putar kamar mandi buah 72,600 83,500 84,200 84,900 85,700 86,400 87,100
Engsel
107 Engsel pintu Nylon (kwalitas prima) buah 143,000 164,500 165,900 167,300 168,700 170,200 171,600
108 Engsel pintu kuningan buah 37,000 42,600 42,900 43,300 43,700 44,000 44,400
109 Engsel jendela Nylon buah 9,900 11,400 11,500 11,600 11,700 11,800 11,900
110 Engsel jendela kuningan buah 22,000 25,300 25,500 25,700 26,000 26,200 26,400
Kait Angin
111 Kait angin 6" psg 5,500 6,300 6,400 6,400 6,500 6,500 6,600
112 Kait angin 8" psg 19,800 22,800 23,000 23,200 23,400 23,600 23,800
113 Kait angin 10" psg 24,200 27,800 28,100 28,300 28,600 28,800 29,000
Hak Angin
114 Hak angin biasa buah 11,000 12,700 12,800 12,900 13,000 13,100 13,200
115 Hak angin kualitas baik buah 22,000 25,300 25,500 25,700 26,000 26,200 26,400
Grendel
116 Grendel biasa buah 5,500 6,300 6,400 6,400 6,500 6,500 6,600
117 Grendel kualitas baik buah 16,500 19,000 19,100 19,300 19,500 19,600 19,800
Handle
118 Tarikan / Pegangan pintu kwalitas baik buah 330,000 379,500 382,800 386,100 389,400 392,700 396,000
119 Tarikan / Pegangan pintu biasa buah 275,000 316,300 319,000 321,800 324,500 327,300 330,000
120 Tarikan / Pegangan pintu aluminium buah 385,000 442,800 446,600 450,500 454,300 458,200 462,000

Kelompok Aluminium
Plat aluminium
121 Aluminium composite panel 3 mm + rangka m² 465,850 475,200 477,200 477,800 480,700 488,100 490,700
122 Aluminium composite panel 4 mm + rangka m² 512,400 522,600 524,900 525,500 528,700 536,900 539,700
123 Aluminium foil m² 50,400 51,400 51,600 51,700 52,000 52,800 53,100
Kusen Aluminium
124 Kusen Almunium 4" Coklat m' 199,650 203,600 204,500 204,800 206,000 209,200 210,300
125 Kusen Almunium 4" Putih m' 146,400 149,300 150,000 150,100 151,100 153,400 154,200
Pintu+Kaca Aluminium
126 Pintu Kaca Rayban Alumunium 4" Putih unit 2,435,700 2,484,400 2,495,000 2,498,000 2,513,200 2,552,000 2,565,700
127 Pintu Kaca Bening Alumunium 4" Putih unit 2,395,800 2,443,700 2,454,100 2,457,100 2,472,100 2,510,200 2,523,700
128 Pintu Kaca Rayban Alumunium 4" Coklat unit 2,701,900 2,755,900 2,767,700 2,771,000 2,787,900 2,830,900 2,846,100
129 Pintu Kaca Bening Alumunium 4" Coklat unit 2,662,000 2,715,200 2,726,800 2,730,100 2,746,700 2,789,100 2,804,100
Jendela+Kaca Aluminium
130 Jendela Kaca Rayban Alumunium 4" Putih Engsel S unit 599,000 611,000 613,400 615,200 618,100 627,800 624,800
131 Jendela Kaca Rayban Alumunium 4" Putih Engsel A unit 599,000 611,000 613,400 615,200 618,100 627,800 624,800
132 Jendela Kaca Bening Alumunium 4" Putih Engsel S unit 532,400 543,000 545,200 546,800 549,400 558,000 555,300
133 Jendela Kaca Bening Alumunium 4" Putih Engsel Ay unit 532,400 543,000 545,200 546,800 549,400 558,000 555,300
134 Jendela Kaca Rayban Alumunium 4" Coklat Engsel unit 665,500 678,800 681,500 683,500 686,800 697,400 694,100
135 Jendela Kaca Rayban Alumunium 4" Coklat Engsel unit 665,500 678,800 681,500 683,500 686,800 697,400 694,100
136 Jendela Kaca Bening Alumunium 4" Coklat Engsel unit 599,000 611,000 613,400 615,200 618,100 627,800 624,800
137 Jendela Kaca Bening Alumunium 4" Coklat Engsel unit 599,000 611,000 613,400 615,200 618,100 627,800 624,800
138 Jendela Kaca Mati Rayban Alumunium 4" m² 825,200 841,700 845,000 847,500 851,600 864,800 860,700
139 Jendela Kaca Mati Bening Alumunium 4" m² 758,700 773,900 776,900 779,200 783,000 795,100 791,400

Page 134
Pintu Aluminium
140 Pintu Lipat Varia m² 1,904,700 1,942,800 1,950,400 1,956,100 1,965,600 1,996,100 1,986,600
141 Rolling Door Alumunium m² 1,271,105 1,296,500 1,301,600 1,305,400 1,311,800 1,332,100 1,325,800
142 Pintu Alumunium m² 732,100 746,800 749,700 751,900 755,500 767,200 763,600
143 Pintu almunium unit 1,264,450 1,289,800 1,294,800 1,298,600 1,304,900 1,325,100 1,318,800
Jendela BV Aluminium
144 Jendela Casemen standard BV tanpa kaca (A 4,5m' Bh 600,350 612,400 614,700 616,500 619,600 629,100 626,200
145 Jendela Casemen standard BV tanpa kaca (A 4,5m' Bh 675,400 688,900 691,600 693,600 697,000 707,700 704,500
146 Jendela Casemen BV tanpa kaca (A 2,8m' )Gloss Bh 469,050 478,400 480,300 481,700 484,100 491,500 489,200
147 Jendela Casemen BV tanpa kaca (A 2,8m' )Doff Bh 515,875 526,200 528,200 529,800 532,400 540,600 538,100
Jendela Sliding Aluminium
148 Jendela Sliding ekonomi standard kaca ( A 4,5 m') G Bh 598,950 610,900 555,900 615,200 618,100 627,700 624,700
149 Jendela Sliding ekonomi standard kaca ( A 4,5 m') D Bh 469,050 478,400 435,300 481,700 484,000 491,600 489,200
Jalusi Aluminium
150 Louvre( Jalusi ) 7 cm,coklat,merk superex m' 30,050 ### 30,600 30,800 30,800 31,000 31,500 32,700
151 Louvre( Jalusi ) 10 cm,coklat,merk superex m' 60,000 ### 61,100 61,400 61,500 61,900 62,800 65,200
Rangka Plafon & Dinding
152 Plafon spandel,coklat,merk superex m² 431,425 ### 440,100 441,800 443,100 445,200 452,200 450,000
153 Rangka curtain wall,coklat,merk superex m² 337,625 ### 344,400 345,700 346,700 348,500 353,800 352,200
154 Sunscren Alumunium m² 753,975 ### 769,100 772,100 774,400 778,100 790,200 786,400
Lain-lain
155 Sealent Kg 79,860 81,500 81,800 82,000 82,500 83,700 83,400
156 Puzzdith - 100 XR Liter 41,625 42,500 42,600 42,800 43,000 43,600 43,500
Profil Kaca m' 35,000 35,700 35,800 35,900 36,100 36,700 36,600

Kelompok Penutup Lantai & Dinding :


Keramik Lantai
157 Keramik polos kw. 1 ukuran 20 x 20 cm m² 71,500 72,600 72,700 72,800 72,700 72,900 72,900
158 Keramik motif kw. 1 ukuran 20 x 20 cm m² 71,500 72,600 72,700 72,800 72,700 72,900 72,900
159 Keramik polos kw.1 ukuran 30 x 30 cm m² 66,000 67,000 67,100 67,200 67,100 67,300 67,300
160 Keramik motif kw.1 ukuran 30 x 30 cm m² 71,500 72,600 72,700 72,800 72,700 72,900 72,900
161 Keramik motif granit kw.1 ukuran 30 x 30 cm m² 199,650 202,600 202,900 203,200 203,100 203,500 203,500
162 Keramik polos kw.1 ukuran 40 x 40 cm m² 77,000 78,100 78,200 78,400 78,300 78,500 78,500
163 Keramik motif kw.1 ukuran 40 x 40 cm m² 93,500 94,900 95,000 95,200 95,100 95,300 95,300
164 Keramik motif granit kw.1 ukuran 40 x 40 cm m² 266,200 270,200 270,500 271,000 270,800 271,400 271,400
165 Keramik polos kw.1 ukuran 60 x 60 cm m² 192,500 195,400 195,600 196,000 195,800 196,200 196,200
166 Keramik motif kw.1 ukuran 60 x 60 cm m² 192,500 195,400 195,600 196,000 195,800 196,200 196,200
167 Keramik motif granit kw.1 ukuran 60 x 60 cm m² 465,850 472,800 473,400 474,200 473,800 474,900 474,900
Keramik Dinding
168 Keramik dinding polos kw.1 ukuran 20 x 25 cm m² 77,000 78,100 78,200 78,400 78,300 78,500 78,500
169 Keramik dinding motif kw.1 uikuran 20 x 25 cm m² 77,000 78,100 78,200 78,400 78,300 78,500 78,500
170 Keramik dinding polos kw 1 uk. 10 x 20 cm m² 60,500 61,400 61,500 61,600 61,500 61,700 61,700
171 Keramik dinding polos kw 1 uk. 10 x 25 cm m² 65,000 66,000 66,100 66,200 66,100 66,300 66,300
Lain-lain
172 Stepnozing anak tangga m' 38,500 39,100 39,100 39,200 39,200 39,200 39,200
173 List keramik m' 27,500 27,900 27,900 28,000 28,000 28,000 28,000
174 Keramik siku m' 2,200 2,200 2,200 2,200 2,200 2,200 2,200
Granit
175 Granit Import m² 1,464,100 1,485,900 1,487,800 1,490,500 1,489,200 1,492,500 1,492,500
176 Granito uk. 30 x 30 cm buah 43,900 44,600 44,600 44,700 44,700 44,800 44,800
177 Granito uk. 40 x 40 cm buah 46,600 47,300 47,400 47,400 47,400 47,500 47,500
Keramik Artistik
178 Keramik Artistik 10/20 ; buah 29,500 29,900 30,000 30,000 30,000 30,100 30,100
179 Keramik Artistik 10/10 buah 14,800 15,000 15,000 15,100 15,100 15,100 15,100
180 Porselin 11 x 11 cm m² 99,825 101,300 101,400 101,600 101,500 101,800 101,800
181 Mozaik 20 x 20 cm m² 525,000 532,800 533,500 534,500 534,000 535,200 535,200
182 Mozaik 30 x 30 cm m² 552,400 560,600 561,400 562,400 561,900 563,100 563,100
Marmer
183 marmer 40 x 40 x 2 m² 213,000 216,200 216,500 216,800 216,600 217,100 217,100
184 marmer 60 x 60 x 2 m² 339,400 344,400 344,900 345,500 345,200 346,000 346,000
185 marmer 30 x 30 x 2 m² 159,700 162,100 162,300 162,600 162,400 162,800 162,800
186 marmer 30 x 10 x 2 m² 133,100 135,100 135,300 135,500 135,400 135,700 135,700
Ubin PC
187 Ubin PC abu - abu buah 5,300 5,400 5,400 5,400 5,400 5,400 5,400
188 Ubin plint PC abu - abu buah 4,700 4,800 4,800 4,800 4,800 4,800 4,800
189 Ubin PC warna buah 8,000 8,100 8,100 8,100 8,100 8,200 8,200
190 Ubin plint PC warna buah 6,700 6,800 6,800 6,800 6,800 6,800 6,800
Parquet
191 Parquet indoor m² 173,000 175,600 175,800 176,100 176,000 176,400 176,400
192 Parquet outdoor m² 266,200 270,200 270,500 271,000 270,800 271,400 271,400
Paving
193 Paving blok natural segi 4 tb. 6 cm (K.175) kw. 1 m² 79,900 84,700 89,600 92,000 92,000 96,800 96,800
194 Paving blok natural segi 6 tb. 6 cm (K.175) kw. 1 m² 99,825 105,900 111,900 115,000 115,000 121,000 121,000
195 Paving blok natural segi 4 tb. 8 cm (K.175) kw. 1 m² 93,200 98,800 104,500 107,300 107,300 113,000 113,000
196 Paving blok natural segi 6 tb. 8 cm (K.175) kw. 1 m² 109,100 115,700 122,300 125,600 125,600 132,200 132,200
197 Paving blok natural segi 4 tb. 8 cm (K.350) kw. 1 m² 99,825 105,900 111,900 115,000 115,000 121,000 121,000
198 Paving blok natural segi 6 tb. 8 cm (K.350) kw. 1 m² 131,800 139,800 147,800 151,800 151,800 159,800 159,800
199 Paving blok natural segi 4 tb. 10 cm (K.350) kw. 1 m² 139,800 148,300 156,700 161,000 161,000 169,500 169,500
200 Paving blok natural segi 6 tb. 10 cm (K.350) kw. 1 m² 146,400 155,300 164,100 168,600 168,600 177,500 177,500
Kanstin
201 Kanstin uk. 15 x 20 x 30 x 60 cm buah 86,500 91,700 97,000 99,600 99,600 104,800 104,800
202 Kanstin uk. 10 x 15 x 30 x 60 cm buah 66,550 70,600 74,600 76,600 76,600 80,700 80,700
203 Kanstin uk. 10 x 20 x 50 cm buah 33,275 35,300 37,300 38,300 38,300 40,300 40,300
204 Kanstin beton cetak 10 x 20 x 40 cm buah 16,000 17,000 17,900 18,400 18,400 19,400 19,400
205 Kanstin beton cetak 15 x 30 x 60 cm buah 20,000 21,200 22,400 23,000 23,000 24,200 24,200
Grefel
206 Grefel beton Ø 20 cm buah 51,900 55,000 58,200 59,800 59,800 62,900 62,900
207 Grefel beton Ø 30 cm buah 58,600 62,200 65,700 67,500 67,500 71,000 71,000
Roster
208 Roster bata (10x20) buah 10,000 10,600 11,200 11,500 11,500 12,100 12,100
209 Roster beton (10x20) buah 13,300 14,100 14,900 15,300 15,300 16,100 16,100
210 Roster keramik (25x25) buah 55,000 58,300 61,700 63,300 63,300 66,700 66,700
211 Roster keramik (20x20) buah 44,000 46,700 49,300 50,700 50,700 53,300 53,300
Kelompok Atap :
Genteng
212 Genteng pres lokal buah 5,300 6,100 6,100 6,200 6,300 6,300 6,400
213 Genteng pres jatiwangi buah 7,400 8,500 8,600 8,700 8,700 8,800 8,900
214 Genteng pres open jatiwangi buah 9,300 10,700 10,800 10,900 11,000 11,100 11,200
215 Genteng pres morando biasa buah 4,000 4,600 4,600 4,700 4,700 4,800 4,800
216 Genteng pres morando glasur buah 4,700 5,400 5,500 5,500 5,500 5,600 5,600
217 Genteng beton polos buah 4,700 5,400 5,500 5,500 5,500 5,600 5,600
218 Genteng beton warna buah 7,300 8,400 8,500 8,500 8,600 8,700 8,800
219 Genteng mortir buah 9,800 11,200 11,400 11,500 11,600 11,700 11,800
Nok
220 Nok genteng pres lokal buah 6,800 7,800 7,900 8,000 8,000 8,100 8,200
221 Nok genteng pres jatiwangi buah 8,300 9,500 9,600 9,700 9,800 9,900 10,000
222 Nok genteng pres open jatiwangi buah 10,600 12,100 12,300 12,400 12,500 12,600 12,700
223 Nok genteng morando biasa buah 5,300 6,100 6,100 6,200 6,300 6,300 6,400
224 Nok genteng pres morando glasur buah 6,100 7,000 7,100 7,100 7,200 7,300 7,300
225 Nok genteng beton polos buah 6,100 7,000 7,100 7,100 7,200 7,300 7,300
226 Nok genteng beton warna buah 9,100 10,400 10,600 10,600 10,700 10,800 10,900
Sirap
227 Atap Sirap 4 lapis buah 2,300 2,600 2,700 2,700 2,700 2,700 2,800
Polikarbonat
228 Atap Polikarbonat + rangka besi tempa m² 372,680 427,100 432,400 436,000 439,700 443,300 447,000
229 Atap Polikarbonat + rangka Stainless m² 598,950 686,300 694,900 700,700 706,600 712,500 718,300
230 Atap Polikarbonat; lebar = 120 cm tebal m' 272,250 312,000 315,800 318,500 321,200 323,800 326,500
231 Atap Polikarbonat; lebar = 120 cm tipis m' 163,350 187,200 189,500 191,100 192,700 194,300 195,900
Seng gelombang
232 Seng gelombang BJLS 30 lbr 64,950 73,500 74,500 75,800 77,700 78,300 79,000
233 Seng gelombang (210 x 80 x 0.2 cm) lbr 40,700 45,500 46,700 47,500 48,700 49,100 49,500
234 Seng gelombang 3'-6' (90 x 180 x 0.2 cm) lbr 40,700 45,500 46,700 47,500 48,700 49,100 49,500
Seng plat
235 Seng Plat BJLS 30 lebar 90 cm ; panjang 180 lbr 52,500 58,700 60,200 61,200 62,800 63,300 63,800
236 Seng Plat BJLS 30 lebar 60 cm ; panjang 180 cm lbr 25,000 27,900 28,700 29,200 29,900 30,200 30,400
237 Seng Plat BJLS 30 lebar 30 cm ; panjang 180 cm lbr 18,750 21,000 21,500 21,900 27,500 22,600 22,800
238 Seng Plat BJLS 20 lebar 20 cm ; panjang 180 cm lbr 15,000 16,800 17,200 17,500 17,900 18,100 18,200
Fiber
239 Atap fiber gelombang 90cm x 180cm lbr 57,500 66,100 66,700 67,300 67,800 68,400 69,100
240 Atap fiber glass lbr 119,800 137,700 138,900 140,200 141,300 142,500 143,900
241 Talang U pvc lonjor 115,000 128,800 132,300 134,600 138,000 139,200 140,300
242 Fiberglass gelombang uk. 180 x 80 cm lbr 119,800 137,700 138,900 140,200 141,300 142,500 143,900
262 Fiberglass plat lebar 100 cm m'
Metal
Atap metal 77 cm x 80 cm (Sakura Roof) lbr 45,200 51,950 52,400 52,850 53,300 54,000 54,250
Atap metal 77 cm x 80 cm (Surya Roof) lbr 79,375 91,275 92,075 92,875 93,700 94,350 95,250
Atap metal 77 cm x 80 cm (Multi Roof) lbr 140,425 161,525 162,900 164,300 165,725 167,075 168,500
243 Bubungan metal buah 33,300 38,300 38,600 38,900 39,300 39,800 40,000

Page 135
Kelompok Cat / Minyak :
Bahan Cair
244 Ai r liter 40 41 41 ### 41 41 42
245 Minyak Terpentin kg 8,800 9,400 10,000 10,600 10,600 11,700 11,700
246 Minyak Bekisting ( olie bekas ) liter 10,600 11,300 12,000 12,700 12,700 14,100 14,100
247 Spirtus liter 8,000 8,500 9,100 9,600 9,600 10,700 10,700
248 Teer kg 8,250 8,800 9,400 9,900 9,900 11,000 11,000
249 Solar liter 9,900 9,900 10,010 10,120 10,230 10,900 9,900
250 Solar industri liter 13,200 13,200 13,300 13,500 13,600 14,500 13,200
251 Minyak tanah liter 8,000 8,700 9,300 9,300 9,300 10,700 8,000
252 Minyak pelumas liter 39,900 39,900 40,300 40,800 41,200 43,900 42,350
253 Bensin liter 9,900 9,900 10,010 10,120 10,230 10,900 9,900
254 Teak oil kg 33,400 33,400 33,800 34,100 34,500 36,700 33,400
Cat minyak
255 Cat Warna ( Kayu/besi ) 5 kg kaleng 247,500 251,800 253,100 253,100 253,100 253,700 255,500
256 Cat Warna ( Kayu/besi ). kg 47,300 ### 48,100 48,400 48,400 48,400 48,500 48,800
257 Cat dasar ( meni kayu/besi ) 5 kg kaleng 110,000 ### 111,900 112,500 112,500 112,500 112,800 113,600
258 Cat dasar ( meni kayu/besi ) kg 24,200 ### 24,600 24,700 24,700 24,700 24,800 25,000
259 Cat khusus atap kg 115,500 117,500 118,100 118,100 118,100 118,400 119,300
260 Cat khusus atap 5 kg kaleng 115,500 117,500 118,100 118,100 118,100 118,400 119,300
261 Vernis bening ltr 41,800 42,500 42,700 42,700 42,700 42,800 43,200
262 Vernis warna ltr 49,500 50,400 50,600 50,600 50,600 50,700 51,100
263 Politur kg 47,300 48,100 48,400 48,400 48,400 48,500 48,800
Pengencer
264 Tinner A spesial kg 29,700 30,200 30,400 30,400 41,800 30,400 30,700
265 Tinner A kg 25,300 25,700 25,900 25,900 25,900 25,900 26,100
266 Tinner B kg 23,100 23,500 23,600 23,600 41,800 23,700 23,900
267 Tinner khusus kg 19,800 20,100 20,200 20,200 20,200 20,300 20,400
Cat air
268 Cat tembok eksterior 5 kg (kwalitas sedang) kaleng 115,500 117,500 118,100 118,100 118,100 118,400 119,300
269 Cat tembok eksterior kg 23,100 23,500 23,600 23,600 23,600 23,700 23,900
270 Cat tembok interior 5 kg kaleng 110,000 111,900 112,500 112,500 112,500 112,800 113,600
271 Cat tembok interior (kwalitas sedang) kg 22,000 22,400 22,500 22,500 22,500 22,600 22,700
272 Cat tembok curah eksterior 5 kg kaleng 71,500 72,800 73,100 73,100 73,100 73,300 73,800
273 Cat tembok curah eksterior kg 14,300 14,600 14,600 14,600 14,600 14,700 14,800
274 Cat tembok curah interior 5 kg kaleng 66,000 67,200 67,500 67,500 67,500 67,700 68,100
275 Cat tembok curah interior kg 13,200 13,400 13,500 13,500 13,500 13,500 13,600
Plamur/dempul
276 Plamur Kayu 5 kg kaleng 110,000 111,900 112,500 112,500 112,500 112,800 113,600
277 Plamur Kayu kg 22,000 22,400 22,500 22,500 22,500 22,600 22,700
278 Plamur Tembok 5 kg kaleng 41,800 42,500 42,700 42,700 42,700 42,800 43,200
279 Plamur Tembok kg 8,360 8,500 8,500 8,500 8,500 8,600 8,600
280 Flincote kg 33,000 33,600 33,700 33,700 33,700 33,800 34,100
Amplas
281 Amplas kayu/besi lbr 5,000 5,100 5,100 5,100 5,100 5,100 5,200
282 Amplas kayu/besi m 13,200 13,400 13,500 13,500 13,500 13,500 13,600
Lain-lain
283 Batu kambang (batu apung) kg 46,600 47,400 47,600 47,600 47,600 47,800 48,100
284 Sirlak kg 199,650 203,100 204,100 204,100 204,100 204,600 206,100
285 Oker putih kg 22,600 23,000 23,100 23,100 23,100 23,200 23,300
286 Oker warna kg 25,600 26,000 26,200 26,200 26,200 26,200 26,400
287 Melamin kg 73,200 74,500 74,800 74,800 74,800 75,000 75,600
288 Kuas cat buah 17,600 17,900 18,000 18,000 18,000 18,000 18,200
289 Roll Cat buah 15,400 15,700 15,700 15,700 15,700 15,800 15,900
290 Residu / Soligium ltr 11,700 11,900 12,000 12,000 12,000 12,000 12,100
291 Lem Kayu kg 28,000 28,500 28,600 28,600 28,600 28,700 28,900
292 Lem Kuning kg 38,500 39,200 39,400 39,400 39,400 39,500 39,800
293 Godler/residu kg 9,600 9,800 9,800 9,800 9,800 9,800 9,900
294 Wallpaper m2 93,200 94,800 95,300 95,300 95,300 95,500 96,200
295 Soda api kg 13,300 13,500 13,600 13,600 13,600 13,600 13,700
296 Sabun deterjen kg 20,000 20,400 20,500 20,500 20,500 20,500 20,700
297 Wood Filler kg 49,500 50,400 50,600 50,600 50,600 50,700 51,100

Kelompok Cement, Beton & Kaca:


Portland Cement ( PC )
298 Portland Cement ( PC ) 40 kg zak 72,800 89,600 89,600 96,100 90,000 112,560 104,500
299 Portland Cement ( PC ) 50 kg zak 87,800 115,000 115,000 115,900 113,700 140,700 122,700
300 Portland Cement ( PC ) kg 1,820 2,240 2,240 2,403 2,250 2,814 2,613
301 Cement warna kg 16,500 17,600 19,100 19,100 21,300 22,500 19,100
302 Cement putih kg 4,400 4,700 5,100 5,100 5,700 6,000 5,100
Beton
303 Beton K 125 (ready mix) m³ 1,120,500 1,379,100 1,357,500 1,479,600 1,450,900 1,795,700 1,565,800
304 Beton K 175 (ready mix) m³ 1,171,300 1,441,600 1,419,100 1,546,700 1,516,700 1,877,100 1,636,800
305 Beton K 225 (ready mix) m³ 1,228,150 1,511,600 1,488,000 1,621,800 1,590,300 1,968,200 1,716,300
306 Beton K 250 (ready mix) m³ 1,276,550 1,571,100 1,546,600 1,685,700 1,653,000 2,045,800 1,783,900
307 Beton K 275 (ready mix) m³ 1,333,400 1,641,100 1,615,500 1,760,800 1,726,600 2,136,900 1,863,300
308 Beton K 300 (ready mix) m³ 1,500,400 1,846,600 1,817,800 1,981,300 1,942,800 2,404,500 2,096,700
309 Beton K 350 (ready mix) m³ 1,524,600 1,876,400 1,847,100 2,013,300 1,974,200 2,443,300 2,130,500
Tiang Pancang
344 Tiang Pancang 20/20 K-450 + Joint (ex. Surabaya) m' 252,400 310,600 305,800 333,300 326,800 404,500 352,700
345 Tiang Pancang 25/25 K-500 + Joint (ex. Surabaya) m' 372,000 457,800 450,700 491,200 481,700 596,200 519,800
346 Tiang Pancang 30/30 K-500 + Joint (ex. Surabaya) m' 480,200 591,000 581,800 634,100 621,800 769,600 671,000
347 Tiang Pancang 35/35 K-500 + Joint (ex. Surabaya) m' 625,600 770,000 757,900 826,100 810,100 1,002,600 874,200
348 Tiang Pancang 40/40 K-500 + Joint (ex. Surabaya) m' 771,000 948,900 934,100 1,018,100 998,300 1,235,600 1,077,400
Kaca
303 Kaca bening tebal 3 mm m² 113,100 130,100 131,200 132,300 133,500 134,600 135,700
304 Kaca bening tebal 5 mm m² 173,000 199,000 200,700 202,400 204,100 205,900 207,600
305 Kaca rayban tebal 3 mm m² 171,700 197,500 199,200 200,900 202,600 204,300 206,000
306 Kaca rayban tebal 5 mm m² 237,800 273,500 275,800 278,200 280,600 283,000 285,400
307 Kaca Buram tebal 3 mm m² 135,800 156,200 157,500 158,900 160,200 161,600 163,000
308 Kaca Buram tebal 5 mm m² 223,600 257,100 259,400 261,600 263,800 266,100 268,300
309 Jendela nako buah 26,600 27,100 27,200 27,300 27,500 27,900 27,700
310 Kaca cermin 3 mm m² 226,300 260,200 262,500 264,800 267,000 269,300 271,600
311 Kaca cermin 5 mm m² 332,800 382,700 386,000 389,400 392,700 396,000 399,400
312 Kaca patri m² 1,019,500 1,172,400 1,182,600 1,192,800 1,203,000 1,213,200 1,223,400
313 Kaca grafir warna m² 1,325,700 1,524,600 1,537,800 1,551,100 1,564,300 1,577,600 1,590,800
314 Kaca sunblast m² 705,400 811,200 818,300 825,300 832,400 839,400 846,500
315 Glassblock buah 27,500 31,600 31,900 32,200 32,500 32,700 33,000

Kelompok Sanitary
Shower
316 Shower stainless buah 266,200 270,300 271,000 271,000 271,000 271,700 273,000
317 Shower stainless kualitas baik buah 275,000 279,200 280,000 280,000 280,000 280,700 282,100
318 Shower standar/biasa buah 93,500 94,900 95,200 95,200 95,200 95,400 95,900
319 Shower kualitas baik buah 133,100 135,200 135,500 135,500 135,500 135,800 136,500
Kran air
320 Kran air plastik buah 11,000 11,200 11,200 11,200 11,200 11,200 11,300
321 Kran air stainless buah 88,000 89,400 89,600 89,600 89,600 89,800 90,300
Seal Tape bh 3,000
Tangki air fiberglas
322 Tangki air fiberglas Isi : 250 ltr unit 465,850 530,100 535,500 642,600 546,200 803,200 535,500
323 Tangki air fiberglas Isi : 800 ltr unit 1,100,000 1,251,700 1,264,400 1,517,200 1,289,700 1,896,600 1,264,400
324 Tangki air fiberglas Isi : 1100 ltr unit 1,400,000 1,600,000 1,650,000 2,006,900 1,700,000 2,590,000 1,650,000
325 Tangki air fiberglas Isi : 1200 ltr unit 1,600,000 1,800,000 1,850,000 2,206,900 1,900,000 2,790,000 1,850,000
326 Tangki air fiberglas Isi : 2100 ltr unit 2,700,000 ### 3,200,000 3,250,000 3,837,900 3,400,000 3,700,000 3,250,000
327 Tangki air fiberglas Isi : 2200 ltr unit 3,000,000 3,500,000 3,550,000 4,137,900 3,700,000 4,000,000 3,550,000
Tangki air stainless Steel
328 Tangki air stainless steel Isi : 250 ltr unit 998,250 1,135,900 1,147,400 1,376,900 1,170,400 1,721,100 1,147,400
329 Tangki air stainless steel Isi : 800 ltr unit 3,327,500 3,786,500 3,824,700 4,589,700 3,901,200 5,737,100 3,824,700
330 Tangki air stainless steel Isi : 1100 ltr unit 3,826,625 4,354,400 4,398,400 5,278,100 4,486,400 6,597,600 4,398,400
331 Tangki air stainless steel Isi : 1200 ltr unit 3,993,000 4,543,800 4,589,700 5,507,600 4,681,400 6,884,500 4,589,700
332 Tangki air stainless steel Isi : 2100 ltr unit 6,987,750 7,951,600 8,031,900 9,638,300 8,192,500 12,047,800 8,031,900
333 Tangki air stainless steel Isi : 2200 ltr unit 7,320,500 8,330,200 8,414,400 10,097,200 8,582,700 12,621,600 8,414,400
Bak mandi
334 Bak Mandi Fiberglass, volume 120 ltrr (sudut) buah 385,000 390,900 391,900 391,900 391,900 392,900 394,900
335 Bak Mandi Fiberglass, volume 120 ltrr (kotak) buah 385,000 390,900 391,900 391,900 391,900 392,900 394,900
336 Bak Mandi Fiberglass, volume 150 ltrr buah 500,000 507,700 509,000 509,000 509,000 510,300 512,900
Closet
337 Closet duduk buah 137,500 139,600 140,000 140,000 140,000 140,300 141,000
338 Closet duduk monoblock kwalitas prima buah 2,090,000 2,122,300 2,127,700 2,127,700 2,127,700 2,133,000 2,143,700
339 Kloset duduk / Monoblok Warna Putih standard Buah 1,650,000 1,675,500 1,679,700 1,679,700 1,679,700 1,684,000 1,692,400
340 Kloset jongkok Porselin, warna tua Buah 239,775 243,500 244,100 244,100 244,100 244,700 245,900
341 Kloset jongkok Porselin, warna muda Buah 239,775 243,500 244,100 244,100 244,100 244,700 245,900
342 Kloset jongkok Traso dicat Buah 106,480 108,100 108,400 108,400 108,400 108,700 109,200
Lain-lain
343 Urinoir buah 2,462,350 2,500,400 2,506,700 2,506,700 2,506,700 2,513,100 2,525,700
344 Floordrain (saringan buangan air KM/WC) buah 39,930 40,500 40,600 40,600 40,600 40,800 41,000
345 Badkeep Fibreglass buah 552,400 560,900 562,400 562,400 562,400 563,800 566,600
346 Wastafel unit 1,375,000 1,396,200 1,399,800 1,399,800 1,399,800 1,403,300 1,410,400

Page 136
Bak cuci
347 Bak Cuci Stainless Steel ukuran kecil Buah 203,500 206,600 207,200 207,200 207,200 207,700 208,700
348 Bak Cuci Stainless Steel ( 1,00 x 0,90 ) m² Buah 532,400 540,600 542,000 542,000 542,000 543,400 546,100
349 Bak Cuci Stainless Steel 80 Cm Buah 332,750 337,900 338,700 338,700 338,700 339,600 341,300
Pipa

350 Pipa PVC 1/2 AW Buah 20,000 22,100 22,600 23,000 23,500 23,700 23,800
351 Pipa PVC 3/4 AW Buah 24,000 26,500 27,200 27,600 28,200 28,400 28,600
352 Pipa PVC 1 AW Buah 33,300 36,800 37,700 38,300 39,100 39,400 39,600
353 Pipa PVC 1 1/2 AW Buah 61,200 67,600 69,300 70,300 71,900 72,400 72,900
354 Pipa PVC 2 AW Buah 79,900 88,300 90,500 91,800 93,800 94,500 95,100
355 Pipa PVC 2 1/2 AW Buah 114,500 126,500 129,600 131,500 134,400 135,500 136,300
356 Pipa PVC 3 AW Buah 139,800 154,500 158,300 160,600 164,100 165,400 166,500
357 Pipa PVC 4 AW Buah 217,000 239,800 245,700 249,300 254,800 256,800 258,400

Kelompok Kelistrikan
Tusuk Kontak (Steker)
358 Tusuk kontak 2 kutup tanpa pembumian/arde buah 6,100 6,200 6,200 6,200 6,200 6,200 6,300
359 Tusuk kontak 2 kutup dengan pembumian/arde buah 12,100 12,300 12,300 12,300 12,300 12,400 12,400
360 Tusuk kontak 2 kutup tanpa pembumian (timbul) buah 7,600 7,700 7,700 7,700 7,700 7,800 7,800
361 Tusuk kontak 2 kutup dengan pembumian (timbul) buah 13,600 13,800 13,800 13,800 13,900 13,900 13,900
362 Tusuk kontak 2 kutup tanpa pembumian (tanam) buah 6,100 6,200 6,200 6,200 6,200 6,200 6,300
363 Tusuk kontak 2 kutup dengan pembumian (tanam) buah 12,100 12,300 12,300 12,300 12,300 12,400 12,400
364 Pasang instalasi / titik titik 366,000 371,000 371,900 372,500 373,100 373,600 375,100
Lampu pijar
365 Lampu pijar 5 watt buah 6,100 6,200 6,200 6,200 6,200 6,200 6,300
366 Lampu pijar 10 watt buah 7,600 7,700 7,700 7,700 7,700 7,800 7,800
367 Lampu pijar 25 watt/ 40 watt buah 8,700 8,800 8,800 8,900 8,900 8,900 8,900
368 Lampu pijar 60 watt / 75 watt buah 9,100 9,200 9,200 9,300 9,300 9,300 9,300
369 Lampu pijar 100 watt buah 11,300 11,500 11,500 11,500 11,500 11,500 11,600
370 Lampu softone 100 watt buah 22,700 23,000 23,100 23,100 23,100 23,200 23,300
371 Lampu pijar 150 watt buah 51,400 52,100 52,200 52,300 52,400 52,500 52,700
372 Lampu pijar 200 watt buah 59,000 59,800 59,900 60,000 60,100 60,200 60,500
Lampu TL
373 Lampu TL 10 watt buah 8,000 8,100 8,100 8,100 8,200 8,200 8,200
374 Lampu TL 15 watt buah 10,600 10,700 10,800 10,800 10,800 10,800 10,900
375 Lampu TL 18 watt buah 13,300 13,500 13,500 13,500 13,600 13,600 13,600
376 Lampu TL 36 watt buah 16,000 16,200 16,300 16,300 16,300 16,300 16,400
Lampu SLE
377 Lampu SLE 11 watt buah 70,500 71,500 71,600 71,700 71,900 72,000 72,300
378 Lampu SLE 15 watt buah 73,900 74,900 75,100 75,200 75,300 75,400 75,700
379 Lampu SLE 20 watt buah 79,900 81,000 81,200 81,300 81,400 81,600 81,900
Lampu Slang
380 Lampu Slang 2 jalur (sekualitas sinyoku), 1 roll 100 roll 1,730,300 1,753,900 1,758,100 1,760,900 1,763,700 1,766,500 1,773,400
381 Lampu Slang 3 jalur (sekualitas sinyoku), 1 roll 100 roll 2,196,150 2,226,200 2,231,500 2,235,000 2,238,500 2,242,100 2,250,900
Lampu Capsul
382 Lampu Capsul isi 100 pcs 46,600 47,200 47,300 47,400 47,500 47,600 47,800
383 Lampu Capsul isi 140 pcs 66,550 67,500 67,600 67,700 67,800 67,900 68,200
Lampu Anggur
384 Lampu Anggur isi 100 pcs 46,600 47,200 47,300 47,400 47,500 47,600 47,800
385 Lampu Anggur isi 140 pcs 66,550 67,500 67,600 67,700 67,800 67,900 68,200
Lampu Natal
386 Lampu Natal isi 50 pcs 30,000 30,400 30,500 30,500 30,600 30,600 30,700
387 Lampu Natal isi 100 pcs 50,000 50,700 50,800 50,900 51,000 51,000 51,200
Bolam Mercury
388 Bolam Mercury 80 watt buah 195,700 198,400 198,800 199,200 199,500 199,800 200,600
389 Bolam Mercury 125 watt buah 332,750 337,300 338,100 338,600 339,200 339,700 341,000
390 Bolam Mercury 250 watt buah 549,700 557,200 558,500 559,400 560,300 561,200 563,400
391 Bolam Mercury 400 watt buah 858,500 870,200 872,300 873,700 875,100 876,400 879,900
Bolam Halogin
392 Bolam Halogin 500 watt buah 33,000 33,500 33,500 33,600 33,600 33,700 33,800
393 Bolam Halogin 1000 watt buah 44,000 44,600 44,700 44,800 44,800 44,900 45,100
Starter & Travo
394 Starter TL 20/40 watt buah 6,700 6,800 6,800 6,800 6,800 6,800 6,900
395 Travo TL 10 watt buah 29,300 29,700 29,800 29,800 29,900 29,900 30,000
396 Travo TL 20 watt buah 33,000 33,500 33,500 33,600 33,600 33,700 33,800
397 Travo TL 40 watt buah 33,000 33,500 33,500 33,600 33,600 33,700 33,800
Balast Mercury
398 Balast Mercury 80 watt buah 99,825 101,200 101,400 101,600 101,800 101,900 102,300
399 Balast Mercury 125 watt buah 119,800 121,400 121,700 121,900 122,100 122,300 122,800
400 Balast Mercury 250 watt buah 197,000 199,700 200,200 200,500 200,800 201,100 201,900
401 Balast Mercury 400 watt buah 239,600 242,900 243,500 243,800 244,200 244,600 245,600
Fitting
402 Fitting Kecil Lampu 2,5 Watt buah 3,750 3,800 3,800 3,800 3,800 3,800 3,800
403 Fitting Plastik Hitam buah 4,375 4,400 4,400 4,500 4,500 4,500 4,500
404 Fitting Gantung plastik gantung buah 5,000 5,100 5,100 5,100 5,100 5,100 5,100
405 Fitting duduk buah 12,500 12,700 12,700 12,700 12,700 12,800 12,800
Kap Aluminium
406 Kap Alumunium E.27 buah 113,100 114,600 114,900 115,100 115,300 115,500 115,900
407 Kap Alumunium E.40 buah 139,800 141,700 142,000 142,300 142,500 142,700 143,300
Kabel Snoor & NYA
408 Kabel NYA 2,5 sqmm roll 297,000 301,100 301,800 302,300 302,700 303,200 304,400
409 Kabel NYA 1,5 sqmm roll 198,000 200,700 201,200 201,500 201,800 202,100 202,900
410 Kabel NYA 2,5 sqmm m' 4,400 4,500 4,500 4,500 4,500 4,500 4,500
411 Kabel NYA 1,5 sqmm m' 3,300 3,300 3,400 3,400 3,400 3,400 3,400
Kabel NYM
412 Kabel NYM 2 x 1,5 sqmm m1 10,000 10,100 10,200 10,200 10,200 10,200 10,200
413 Kabel NYM 2 x 2,5 sqmm m1 12,500 12,700 12,700 12,700 12,700 12,800 12,800
414 Kabel NYM 2 x 4 sqmm m1 12,500 12,700 12,700 12,700 12,700 12,800 12,800
415 Kabel NYM 3 x 1,5 sqmm m1 12,500 12,700 12,700 12,700 12,700 12,800 12,800
416 Kabel NYM 3 x 2,5 sqmm m1 15,000 15,200 15,200 15,300 15,300 15,300 15,400
417 Kabel NYM 3 x 4 sqmm m1 25,000 25,300 25,400 25,400 25,500 25,500 25,600
Saklar & Stop kontak
418 Skaklar seri OB buah 17,500 17,700 17,800 17,800 17,800 17,900 17,900
419 Skaklar seri IB buah 22,500 22,800 22,900 22,900 22,900 23,000 23,100
420 Skaklar engkel OB buah 22,500 22,800 22,900 22,900 22,900 23,000 23,100
421 Skaklar engkel IB buah 15,000 15,200 15,200 15,300 15,300 15,300 15,400
422 Stop kontak IB buah 22,500 22,800 22,900 22,900 22,900 23,000 23,100
423 Stop kontak OB buah 15,000 15,200 15,200 15,300 15,300 15,300 15,400
Kapasitor
424 Kapasitor 25 F buah 25,000 25,300 25,400 25,400 25,500 25,500 25,600
425 Kapasitor 20 F buah 25,000 25,300 25,400 25,400 25,500 25,500 25,600
426 Kapasitor 12,5 uF buah 25,000 25,300 25,400 25,400 25,500 25,500 25,600
MCB
427 MCB 25 Ampere / 16 Ampere buah 62,500 63,400 63,500 63,600 63,700 63,800 64,100
428 MCB 40 Ampere buah 87,500 88,700 88,900 89,000 89,200 89,300 89,700
429 MCB 6 Ampere buah 56,250 57,000 57,200 57,200 57,300 57,400 57,700
Box
430 Box Kwh Meter 25 x 35 x 20 buah 173,900 176,300 176,700 177,000 177,300 177,500 178,200
431 Box panel 30 x 40 x 20 buah 262,400 266,000 266,600 267,000 267,500 267,900 268,900
432 Box 25 x 25 x 20 buah 143,700 145,700 146,000 146,200 146,500 146,700 147,300
433 Box 20 x 40 x 50 buah 332,800 337,300 338,200 338,700 339,200 339,800 341,100
Timer
434 Timer Delay H3-BA (omron) buah 958,320 971,400 973,700 975,300 976,800 978,300 982,200
Lain-lain
435 Pilot Lamp buah 4,500 4,600 4,600 4,600 4,600 4,600 4,600
436 Kop sekering buah 2,300 2,300 2,300 2,300 2,300 2,300 2,400
437 Isolasi besar buah 7,700 7,800 7,800 7,800 7,800 7,900 7,900
438 Spot + F.MP buah - - - - - -
438 Tang Kombinasi buah 33,000 33,500 33,500 33,600 33,600 33,700 33,800
439 Obeng +/- buah 22,000 22,300 22,400 22,400 22,400 22,500 22,500
440 GZ 30 A buah - - - - - -
440 Multitester buah 378,100 383,300 384,200 384,800 385,400 386,000 387,500
441 Sekering buah 12,900 13,100 13,100 13,100 13,100 13,200 13,200
442 Mata lampu pijar 25 W -75 W buah 7,700 7,800 7,800 7,800 7,800 7,900 7,900
443 Stabilizer 300 A unit 266,200 269,800 270,500 270,900 271,300 271,800 272,800
444 Alat Bantu unit 56,100 ### 56,100 56,100 ### 56,100 56,100 ###
Keterangan : Harga Satuan sudah termasuk PPN dan PPh

Page 137
1 1 1 1 1 5.333333333
1 1 1 1 1 6.25

1 1 1 1 1 4.050925926
2.186858316 1 2.899383984 1 1.232032854 3.850102669
2.186858316 1 2.899383984 1 1.232032854 3.850102669

1.066666667 1 1.580246914 1 1.333333333 1.777777778


1.066666667 1 1.580246914 1 1.333333333 1.777777778
1 1 2.14480198 1 1.082920792 2.784653465
1 1 2.14480198 1 1.082920792 2.784653465
1 1 2.323319027 1 1 3.21888412
1.018382353 1.025735294 1.0294117647 1.033088235 1.049632353 1.045955882
1.018382353 1.025735294 1.0294117647 1.033088235 1.049632353 1.045955882
1.066666667 1 1.580246914 1 1.333333333 1.777777778
1.066666667 1 1.580246914 1 1.333333333 1.777777778

1 1 1.471938776 1.631377551 2.933673469 1.530612245


1 1 1.471938776 1.631377551 2.933673469 1.530612245
1 1 1.471938776 1.631377551 2.933673469 1.530612245

1 1 1.471938776 1.631377551 2.933673469 1.530612245


1 1 1.471938776 1.631377551 2.933673469 1.530612245
1 1 1.471938776 1.631377551 2.933673469 1.530612245
1 1 1.471938776 1.631377551 2.933673469 1.530612245

1.014456317 1.016027656 1.01822753 1.016760947 1.019170333 1.018646554


1.014456317 1.016027656 1.01822753 1.016760947 1.019170333 1.018646554
1.014456317 1.016027656 1.01822753 1.016760947 1.019170333 1.018646554
1.014456317 1.016027656 1.01822753 1.016760947 1.019170333 1.018646554
1.014456317 1.016027656 1.01822753 1.016760947 1.019170333 1.018646554

1.0625 1.125 1.1875 1.1875 1.25 1.875


1.0625 1.125 1.1875 1.1875 1.25 1.875
1.08 1.16 1.2 1.2 1.28 1.28
1.08 1.16 1.2 1.2 1.28 1.28

1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474


1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474
1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474

0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333


0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333
0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333
0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333
0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333

0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333


0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333
0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333
0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333
0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333
0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333
0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333
0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333

0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333


0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333
0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333
0.866666667 0.833333333 0.833333333 0.833333333 0.866666667 1.333333333

0.923076923 0.884615385 0.884615385 0.884615385 0.923076923 1.384615385


0.923076923 0.884615385 0.884615385 0.884615385 0.923076923 1.384615385
0.923076923 0.884615385 0.884615385 0.884615385 0.923076923 1.384615385
0.923076923 0.884615385 0.884615385 0.884615385 0.923076923 1.384615385
0.923076923 0.884615385 0.884615385 0.884615385 0.923076923 1.384615385
0.923076923 0.884615385 0.884615385 0.884615385 0.923076923 1.384615385
0.923076923 0.884615385 0.884615385 0.884615385 0.923076923 1.384615385

1 0.785714286 0.785714286 0.785714286 0.857142857 1.571428571


1 0.928571429 0.928571429 0.928571429 0.928571429 1.571428571
1 0.928571429 0.928571429 0.928571429 0.928571429 1.571428571
1 0.928571429 0.928571429 0.928571429 0.928571429 1.571428571
0.927272727 0.772727273 0.772727273 0.772727273 0.927272727 1
1 0.928571429 0.928571429 0.928571429 1 1.771428571
1 0.928571429 0.928571429 0.928571429 1 2.142857143
1.133333333 0.888888889 0.888888889 0.888888889 1.133333333 1.666666667
0.927272727 0.772727273 0.772727273 0.772727273 0.927272727 1

Page 138
0.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.454545455
0.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.454545455
0.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.454545455
0.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.454545455
0.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.454545455
0.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.454545455
0.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.454545455
0.909090909 0.863636364 0.863636364 0.863636364 0.909090909 1.454545455

1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474


1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474

1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474


1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474
1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474
1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474

1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474


1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474

1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474


1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474
1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474
1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474
1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474

1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474


1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474
1.014528509 1.015076754 1.01754386 1.016447368 1.018914474 1.018914474

1.015015015 1.021021021 1.018 1.021021021 1.021021021 1.027027027


1.015015015 1.021021021 1.018 1.021021021 1.021021021 1.027027027
1.015015015 1.021021021 1.018 1.021021021 1.021021021 1.027027027
1.015015015 1.021021021 1.018 1.021021021 1.021021021 1.027027027
1.015015015 1.021021021 1.018 1.021021021 1.021021021 1.027027027
1.015015015 1.021021021 1.018 1.021021021 1.021021021 1.027027027

1.016166282 1.020785219 1.025404157 1.025404157 1.051963048 1.066974596


1.02 1.04 1.08 1.04 1.12 1.08
1.013665595 1.01607717 1.017684887 1.017684887 1.019292605 1.0233118971
1.018348624 1.022518766 1.030025021 1.030025021 1.1109257715 1.018348624
1.018348624 1.022518766 1.030025021 1.030025021 1.1109257715 1.018348624
1.013513514 1.024774775 1.04954955 1.027027027 1.076576577 1.027027027
1.013513514 1.024774775 1.04954955 1.027027027 1.076576577 1.027027027
1.013513514 1.024774775 1.04954955 1.027027027 1.076576577 1.027027027

1.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.381818182


1.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.381818182
1.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.381818182
1.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.381818182
1.014514515 1.016016016 1.018018018 1.016816817 1.019019019 1.018818819
1.014514515 1.016016016 1.018018018 1.016816817 1.019019019 1.018818819
1.014514515 1.016016016 1.018018018 1.016816817 1.019019019 1.018818819
1.014514515 1.016016016 1.018018018 1.016816817 1.019019019 1.018818819
1.014514515 1.016016016 1.018018018 1.016816817 1.019019019 1.018818819
1.014514515 1.016016016 1.018018018 1.016816817 1.019019019 1.018818819
1.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.381818182
1.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.381818182
1.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.381818182
1.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.381818182

1.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.381818182


1.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.381818182
1.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.381818182
1.018181818 1.090909091 1.381818182 1.236363636 1.454545455 1.381818182

1.15 1.16 1.17 1.18 1.2 1.16


1.15 1.16 1.17 1.18 1.2 1.16
1.15 1.16 1.17 1.18 1.2 1.16
1.15 1.16 1.17 1.18 1.2 1.16
1.148648649 1.153153153 1.585585586 1.774774775 2.027027027 1.153153153
1.15 1.16 1.17 1.18 1.2 1.16
1.15 1.16 1.17 1.18 1.2 1.16
1.15 1.16 1.17 1.18 1.2 1.16
1.15 1.16 1.17 1.18 1.2 1.16
1.15 1.16 1.17 1.18 1.2 1.16
1.15 1.16 1.17 1.18 1.2 1.16
1.01463964 1.016047297 1.017924174 1.016704204 1.019237988 1.018768769
1.01463964 1.016047297 1.017924174 1.016704204 1.019237988 1.018768769
1.01463964 1.016047297 1.017924174 1.016704204 1.019237988 1.018768769
1.01463964 1.016047297 1.017924174 1.016704204 1.019237988 1.018768769
1.01463964 1.016047297 1.017924174 1.016704204 1.019237988 1.018768769
1.01463964 1.016047297 1.017924174 1.016704204 1.019237988 1.018768769

1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2


1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2

1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2

1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2

1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2


1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2
1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2
1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2
1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2
1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2
1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2
1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2

1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2


1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2
1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2
1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2
1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2
1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2
1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2
1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2
1.15 1.160022523 1.170045045 1.180067568 1.19009009 1.2

1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787


1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787
1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787

1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787


1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787

1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787


1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787
1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787
1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787

1.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.043049237


1.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.043049237
1.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.043049237
1.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.043049237
1.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.043049237
1.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.043049237
1.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.043049237
1.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.043049237
1.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.043049237
1.019977758 1.023981397 1.026994237 1.031968456 1.048003235 1.043049237

Page 139
1.020015487 1.02400546 1.0270110643 1.031985405 1.04798467 1.043010329
1.020015487 1.02400546 1.0270110643 1.031985405 1.04798467 1.043010329
1.020015487 1.02400546 1.0270110643 1.031985405 1.04798467 1.043010329
1.020015487 1.02400546 1.0270110643 1.031985405 1.04798467 1.043010329

1.01998834 1.023944366 1.026983426 1.031981344 1.047888732 1.043016574


1.01998834 1.023944366 1.026983426 1.031981344 1.047888732 1.043016574
1.01998834 1.023944366 1.026983426 1.031981344 1.047888732 1.043016574
1.01998834 1.023944366 1.026983426 1.031981344 1.047888732 1.043016574

1.019986676 0.928047968 1.027048634 1.031912059 1.048034644 1.043037975


1.019986676 0.928047968 1.027048634 1.031912059 1.048034644 1.043037975

1.018302829 1.023294509 1.025790349 1.031613977 1.047420965 1.086522463


1.018302829 1.023294509 1.025790349 1.031613977 1.047420965 1.086522463

1.020049835 1.024048212 1.027003535 1.03198702 1.048096425 1.043054992


1.020066642 1.0239911144 1.02695298 1.032062199 1.047982229 1.0430211033
1.020027189 1.024006101 1.027023442 1.031963925 1.048012202 1.043005405

1.021021021 1.024024024 1.027027027 1.032432432 1.048048048 1.044444444


1.021021021 1.024024024 1.027027027 1.032432432 1.048048048 1.044444444
1.021021021 1.024024024 1.027027027 1.032432432 1.048048048 1.044444444

1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369


1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369
1.014864865 1.016216216 1.018018018 1.0171171171 1.019369369 1.019369369

1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212


1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212
1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212
1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212
1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212
1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212
1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212
1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212

1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212


1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212
1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212
1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212
1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212

1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212


1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212

1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212


1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212
1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212
1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212

1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256


1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256
1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256
1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256
1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256
1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256
1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256
1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256

1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256


1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256
1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256
1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256
1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256
1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256
1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256

1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256

1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256


1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256
1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256
1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256

1.1178097345 1.147123894 1.166482301 1.196349558 1.20630531 1.215707965


1.1178097345 1.147123894 1.166482301 1.196349558 1.20630531 1.215707965
1.1178097345 1.147123894 1.166482301 1.196349558 1.20630531 1.215707965

1.1178097345 1.147123894 1.166482301 1.196349558 1.20630531 1.215707965


1.1178097345 1.147123894 1.166482301 1.196349558 1.20630531 1.215707965
1.1178097345 1.147123894 1.166482301 1.196349558 1.20630531 1.215707965
1.1178097345 1.147123894 1.166482301 1.196349558 1.20630531 1.215707965

1.149825784 1.159407666 1.170296167 1.179878049 1.18945993 1.201219512


1.149825784 1.159407666 1.170296167 1.179878049 1.18945993 1.201219512
1.120031797 1.150238474 1.1701112878 1.200052994 1.210121887 1.220190779
1.149825784 1.159407666 1.170296167 1.179878049 1.18945993 1.201219512

1.149336283 1.159292035 1.169247788 1.17920354 1.194690265 1.200221239

1.149336283 1.159292035 1.169247788 1.17920354 1.194690265 1.200221239

Page 140
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.066666667 1.133333333 1.2 1.2 1.333333333 1.333333333
1.066666667 1.133333333 1.2 1.2 1.333333333 1.333333333
1.066666667 1.133333333 1.2 1.2 1.333333333 1.333333333
1.066666667 1.133333333 1.2 1.2 1.333333333 1.333333333
1 1.0111111111 1.022222222 1.033333333 1.1 1
1 1.0111111111 1.022222222 1.033333333 1.1 1
1.083333333 1.166666667 1.166666667 1.166666667 1.333333333 1 1
1 1.0111111111 1.022222222 1.033333333 1.1 1
1 1.0111111111 1.022222222 1.033333333 1.1 1
1 1.0111111111 1.022222222 1.033333333 1.1 1

1.0175 1.0225 1.0225 1.0225 1.025 1.0325


1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325

1.0175 1.0225 1.0225 1.0225 1.025 1.0325


1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325

1.0175 1.0225 1.0225 1.0225 1.025 1.0325


1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325

1.0175 1.0225 1.0225 1.0225 1.025 1.0325


1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325

1.0175 1.0225 1.0225 1.0225 1.025 1.0325


1.0175 1.0225 1.0225 1.0225 1.025 1.0325

1.0175 1.0225 1.0225 1.0225 1.025 1.0325


1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325
1.0175 1.0225 1.0225 1.0225 1.025 1.0325

1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897


1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897
1.231884058 1.217391304 1.289855072 1.289855072 1.594202899 1.391304348
1.068965517 1.155172414 1.155172414 1.293103448 1.362068966 1.155172414
1.068965517 1.155172414 1.155172414 1.293103448 1.362068966 1.155172414

1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897


1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897
1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897
1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897
1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897
1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897
1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897
1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897
1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897
1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897
1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897
1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897
1.230769231 1.2115384615 1.320512821 1.294871795 1.602564103 1.397435897

1.15 1.160003754 1.170007508 1.180001877 1.190005631 1.2


1.15 1.160003754 1.170007508 1.180001877 1.190005631 1.2
1.15 1.160003754 1.170007508 1.180001877 1.190005631 1.2
1.15 1.160003754 1.170007508 1.180001877 1.190005631 1.2
1.15 1.160003754 1.170007508 1.180001877 1.190005631 1.2
1.15 1.160003754 1.170007508 1.180001877 1.190005631 1.2
1.02006552 1.024160524 1.026818182 1.032350532 1.048321048 1.043202293
1.15 1.160003754 1.170007508 1.180001877 1.190005631 1.2
1.15 1.160003754 1.170007508 1.180001877 1.190005631 1.2
1.15 1.160003754 1.170007508 1.180001877 1.190005631 1.2
1.15 1.160003754 1.170007508 1.180001877 1.190005631 1.2
1.15 1.160003754 1.170007508 1.180001877 1.190005631 1.2
1.15 1.160003754 1.170007508 1.180001877 1.190005631 1.2

1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286


1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286

1.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.149425287


1.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.149425287
1.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.149425287
1.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.149425287
1.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.149425287
1.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.149425287

1.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.149425287


1.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.149425287
1.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.149425287
1.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.149425287
1.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.149425287
1.137931034 1.149425287 1.379310345 1.172413793 1.724137931 1.149425287

1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286


1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286

1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286


1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286

Page 141
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286

1.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.190666667


1.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.190666667
1.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.190666667
1.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.190666667
1.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.190666667
1.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.190666667
1.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.190666667
1.105105105 1.132132132 1.148648649 1.174174174 1.183183183 1.190666667

1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614


1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614

1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614


1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614
1.013665595 1.01607717 1.017684887 1.019292605 1.020900322 1.024919614

Page 142
DAFTAR ANALISA
PERHITUNGAN UNIT PRICE
DAERAH KABUPATEN BULUNGAN
TAHUN ANGGARAN 2012

Page 143 ANALISA TG.SELOR DAN TG.PALAS 2011.xls


Page 144 ANALISA TG.SELOR DAN TG.PALAS 2011.xls
DAFTAR HARGA MATERIAL
DINAS PEKERJAAN UMUM KABUPATEN BULUNGAN
PROPINSI : KALIMANTAN TIMUR
KABUPATEN : BULUNGAN
TAHUN ANGGARAN : 2012

HARGA MATERIAL TAHUN 2012 ( Rp )


ZONA 1
NO URAIAN SATUAN TG.SELOR
KETERANGAN
TG. PALAS

I BAHAN

1 Batu Gunung M3 278,437.50 Harga Sudah termasuk PPN 10 %


2 Kerikil Sungai M3 153,780.00

3 Batu Kali Bulat M3 177,760.00


4 Batu Pecah 15 - 20 cm ( Ex Sekatak ) M3 431,200.00

5 Batu Pecah 5 - 7 cm ( Ex Sekatak ) M3 431,200.00

6 Batu Pecah 3 - 5 cm ( Ex Sekatak ) M3 431,200.00


7 Batu Pecah 2 - 3 cm ( Ex Sekatak ) M3 431,200.00

8 Batu Pecah 1 - 2 cm ( Ex Sekatak ) M3 431,200.00

9 Batu Pecah 0,5 - 1 cm ( Ex Sekatak ) M3 431,200.00


10 Abu Batu (ex. Sekatak) M3 431,200.00

11 Pasir Urug / Timbunan M3 95,040.00

12 Pasir Beton M3 107,140.00


13 Kerikil Sungai Tak Disaring M3 28,490.00

14 Timbunan Pilihan M3 66,000.00

15 Timbunan Tanah M3 61,875.00


16 Aspal Kg 17,880.50

17 Batu Bata bh 880.00

18 Bataco bh 2,750.00
19 Minyak Tanah Ltr 6,600.00

20 Minyak Disel / Solar Lt 9,900.00

21 Minyak Premium Lt 9,900.00


22 Minyak Pelumas Lt 38,850.00

23 Tear /Residu lt 8,250.00


24 Semen 40 Kg Kg 1,725.00
25 Semen 40 Kg Zak 68,640.00

26 Semen warna Kg 15,950.00

27 Cat Jembatan Galvanis Kg 38,850.00

28 Kawat Bronjong Kg 21,450.00

Page 145 Harga Material 2011


HARGA MATERIAL TAHUN 2012 ( Rp )
ZONA 1
NO URAIAN SATUAN TG.SELOR KETERANGAN
TG. PALAS

29 Baut Baja Kg 22,200.00

30 Baja Propil Tulangan Beton Kg 15,125.00

31 Alat- alat bantu Unit 56,100.00


32 Profil Tank 650 Lt 1 Unit 870,000.00

33 Profil Tank 1200 Lt 1 Unit 1,600,000.00

34 Profil Tank 2200 Lt 1 Unit 3,000,000.00


35 Kawat Baja ( Bindrat ) Kg 22,200.00

36 Beton Cetak ( Paving Blok ) Buah 3,630.00

37 Air Bersih Ltrr 16.00


38 Koral Sikat Zak 50,000.00

II BAHAN ATAP -
1 Genteng Mortir Buah 9,800.00

2 Besi Strip 2 x 1cm Lembar 30,525.00

3 Besi Plat Lembar 18,300.00


4 Besi Plat Strif 1 x 1 cm Lembar 30,525.00

5 Besi Strip 2 x 2 cm Lembar 42,750.00

6 Besi Strip Meter 3,900.00


7 Seng Plastik 0,90 x 1,80 cm Lembar 45,200.00

8 Seng Gelombang Bjls. 30 Lembar 64,950.00

9 Seng Gelombang Bjls. 20 Lembar 51,625.00


10 Seng Plat Bjls. 30 L = 45 cm 1 M' 26,875.00

11 Seng Plat Bjls. 20 L = 45 cm 1 M' 21,650.00

12 Alumunim Foil M2 12,225.00


13 Sakura Roof ( Ukuran standard 77 X 80 cm ). Lembar 45,200.00

14 Surya Roof ( Ukuran standard 77 X 80 cm ). Lembar 79,375.00


15 Multi Roof ( Ukuran standard 77 X 80 cm ) . Lembar 140,425.00

16 Bubungan Sakura Roof ( Model C ) 1 Buah 27,750.00

17 Bubungan Surya Roop( Model C ) 1 Buah 33,300.00


18 Bubungan Multi Roop( Model C ) 1 Buah 61,050.00

19 Genteng glazuur 1 Buah 28,100.00

20 Bubungan genteng glazuur 1 Buah 17,100.00

23 Atap fiber glass 1 Lembar 57,400.00

24 Talang U PVC 4 M' 94,350.00

25 Genteng Sirap bh 530.00

Page 146 Harga Material 2011


HARGA MATERIAL TAHUN 2012 ( Rp )
ZONA 1
NO URAIAN SATUAN TG.SELOR KETERANGAN
TG. PALAS

III BAHAN KACA -


1 Kaca Polos T. 3 mm 1 M2 99,900.00

2 Kaca Polos T. 5 mm 1 M2 134,325.00

3 Kaca Buram T. 3 mm 1 M2 146,525.00

4 Kaca Buram T. 5 mm 1 M2 164,300.00

5 Kaca Riben T. 3 mm 1 M2 121,125.00

6 Kaca Riben T. 5 mm 1 M2 149,850.00

7 Kaca Riben T.8 mm 2 M2 178,575.00

8 Kaca Nako Polos T. 3 mm 1 M2 109,900.00

9 Kaca Nako Polos T. 5 mm 1 M2 121,000.00

10 Kaca patri warna ( lokal 100% ) 1 M2 888,000.00

11 Kaca patri warna ( import 100% ) 1 M2 2,664,000.00

12 Kaca cermin T.5 mm 1 M2 213,675.00

13 Glass Block 1 Buah 28,100.00

14 Jendela Nako Bh 122,100.00

IV ALAT PENGGANTUNG DAN PENGUNCI -

1 Kunci Yale Itali 1 Buah 222,000.00

2 Kunci Yale Type I 1 Buah 138,750.00

3 Kunci Yale Type II 1 Buah 83,250.00

4 Kunci kuda terbang 1 Buah 83,250.00

5 Kunci Tanam Union 1 Buah 49,950.00

6 Kunci Yale Biasa 1 Buah 72,725.00

7 Kunci Cylindeer WINMA 1 Buah 128,775.00

8 Ensel Kupu - kupu 1 Buah 14,450.00

9 Handel Jendela 1 Buah 25,000.00

10 Hak Angin Biasa 1 Buah 4,450.00

11 Hak Angin Kualitas baik 1 Buah 22,000.00

12 Grendel Biasa 1 Buah 8,900.00

13 Grendel Kuningan 1 Buah 22,200.00

14 Engsel Kuningan 1 Ps 36,650.00

15 Engsel Kuningan Infra 5 Inchi I Buah 36,650.00


16 Pegangan Pintu/door holder 1 Buah 187,050.00

17 Door closer 1 Buah 166,500.00

18 Door Stop 1Buah 125,000.00


-

Page 147 Harga Material 2011


HARGA MATERIAL TAHUN 2012 ( Rp )
ZONA 1
NO URAIAN SATUAN TG.SELOR KETERANGAN
TG. PALAS

V BAHAN LANGIT - LANGIT -

1 Gipsum Board 1 Lembar 91,200.00


2 Playwood 3 mm 1 Lembar 54,125.00

3 Playwood 6 mm 1 Lembar 109,900.00

4 Multi Playwood 10 mm 1 Lembar 194,250.00


5 Multi Playwood 18 mm 1 Lembar 270,575.00

6 Texwood 1 Lembar 122,100.00

7 Jabarwood 1 Lembar 55,500.00


8 Plywood Formica 1 Lembar 55,500.00

9 Milamin 1 Lembar 103,800.00

10 List Plafond Gipsim m 30,000.00


11 Tepung Gipsum kg 5,000.00

VI BAHAN LANTAI -
1 Keramik 60 x 60 cm 1 Ktk/M2 187,325.00

2 Keramik 40 x 40 1 Ktk/M2 74,925.00

3 Keramik 30 x 30 1 Ktk/M2 55,500.00


4 Keramik 20 x 25 1 Ktk/M2 55,500.00

5 Keramik 20 x 20 cm 1 Ktk/M2 53,300.00

6 Porselin 11 x 11 cm 1 Ktk/M2 49,950.00


7 Mozaik 20 x 20 cm 1 Ktk/M2 88,800.00

8 Mozaik 30 x 30 cm 1 Ktk/M2 91,575.00

9 Granite tile Esenza ( Standart ) 1 Ktk/M2 271,950.00


10 Granite tile Esenza ( Motif Khusus ) 1 Ktk/M2 371,850.00

11 Granite tile Inesa 1 Ktk/M2 323,575.00


12 Ubin marmer Bandung 40 x 40 x 2 M2 304,150.00

13 Ubin marmer Bandung 60 x 40 x 2 M2 329,675.00

14 Ubin marmer Bandung 30 x 30 x 2 M2 243,100.00


15 Ubin marmer Bandung 30 x 10 x 2 M2 186,500.00

16 Ubin PC abu-abu 20x20 bh 3,900.00

17 Ubin plint PC abu-abu 10/20 bh 3,500.00

18 Ubin PC warna 20x20 bh 5,500.00

19 Ubin plint PC warna 10/20 bh 3,500.00

20 Batu Palimanan M2 238,650.00

21 Parquet jati 30 x 5 x 1,5 cm M2 305,250.00

Page 148 Harga Material 2011


HARGA MATERIAL TAHUN 2012 ( Rp )
ZONA 1
NO URAIAN SATUAN TG.SELOR KETERANGAN
TG. PALAS

VII BAHAN BESI -

1 Besi Plat Tebal 3 mm - 12 m 1 Lembar 266,400.00


2 Besi beton kg 15,275.00

3 Besi Plat tebal 2mm x 180cm x 240 cm 1 Lembar 499,500.00

4 Besi Strip 2 cm x 2 mm 1 lonjor 38,850.00


5 Besi Strip 1 cm x 1 mm 1 lonjor 27,750.00

6 Besi Baut Diameter 1/2 inch - 45 cm Buah 22,200.00

7 Besi Klam " U " Buah 20,550.00


8 Kawat Duri Roll 184,000.00

9 Kawat Duri Kg 17,775.00

10 Kawat Harmonika 4 x 4 cm 1 M2 34,200.00


11 Kawat Ayam 1 M2 24,975.00

12 Kawat Nyamuk Hitam 1 M2 18,325.00

13 Kawat Nyamuk Putih 1 M2 22,200.00


14 Besi plat strip 1 kg 22,200.00

15 Wiremaah 1kg 22,200.00

-
VIII BAHAN FINISHING -

1 Amplas Kayu / Besi 1 Lembar 5,000.00

2 Amplas Kayu / Besi 1 Meter 10,000.00


3 Kuas Cat 1 Buah 17,350.00

4 Meni Kayu / Besi 5 Kg Kaleng 107,675.00


5 Meni Kayu / Besi 1 Kg 41,625.00

6 Dempul Plamir 5 Kg Kaleng 108,225.00


7 Dempul Plamir 1 Kg 21,925.00

8 Teak Oil 1 Liter 24,425.00

9 Godler / Residu 1 Kg 8,325.00


10 Cat Air 5 Kg Aries 1 Kaleng 36,075.00

11 Cat Air Aries 1 Kg 7,225.00

12 Cat Air 5 kg Catylax 1 Kaleng 104,350.00

13 Cat Air Catylac 1 Kg 20,875.00

14 Cat Lencote interior 1 Kg 55,000.00

15 Cat Mowilex interior 1 kg 59,400.00

16 Cat Mowilex exterior 1 kg 85,800.00

17 Cat duluxe exterior 1 kg 104,500.00

Page 149 Harga Material 2011


HARGA MATERIAL TAHUN 2012 ( Rp )
ZONA 1
NO URAIAN SATUAN TG.SELOR KETERANGAN
TG. PALAS

18 Cat Alkali 1 kg 44,000.00

19 Cat Kilap Glotek 1 Kg 43,850.00

20 Tiner A Spesial 1 Kg 27,750.00


21 Tiner A Biasa 1 Kg 24,425.00

22 Cat Air 5 Kg Gamalek 1 Kaleng 30,525.00

23 Cat Air 5 Kg Gamalek 1 Kg 48,850.00


24 Vernis Clear Lt 45,075.00

25 Vernis warna Lt 46,900.00

26 Pelitur Lt 41,625.00
27 Pelitur Pernis Lt 47,750.00

28 Cat dasar Kg 29,425.00

29 Cat khusus atap 1 Kg 102,125.00


30 Wallpaper kingston M2 57,900.00

31 Soda Api 1 Kg 15,000.00

32 Sabun 1 Kg 16,500.00
33 Batu Apung 1 Kg 13,675.00

IX BAHAN SANITAIR -
1 Closed Jongkok Porselin 1 Buah 239,775.00

2 Closed Duduk Porselin 1 Buah 1,665,000.00

3 Wastapel Porselin 1 Buah 1,348,650.00


4 Bak Cuci Alumunium 1 Buah 636,050.00

5 Urinoir Porselin 1 Buah 271,950.00

6 Closed monoblok 1 Buah 1,615,050.00


7 Bath Knip Plastik / Fiber 1 Buah 757,025.00

8 Kran Air biasa 1 Buah 19,425.00


9 Kran Air Stanlis 1 Buah 66,600.00

10 Kran Air Kuningan 1 Buah 27,750.00

11 Bak mandi fiberglas Uk.70x70x66 cm 1 Buah 388,500.00


12 Floor Drain PVC Bh 13,325.00

13 Floor Drain stanlis Bh 75,000.00

14 Pipa PVC Type AW 1/2" batang 16,650.00

15 Pipa PVC Type AW 3/4" batang 19,100.00

16 Pipa PVC Type AW 1" batang 30,875.00

17 Pipa PVC Type AW 1 1/2" batang 51,512.50

18 Pipa PVC Type AW 2" batang 72,150.00

Page 150 Harga Material 2011


HARGA MATERIAL TAHUN 2012 ( Rp )
ZONA 1
NO URAIAN SATUAN TG.SELOR KETERANGAN
TG. PALAS

19 Pipa PVC Type AW 2 1/2" batang 102,675.00

20 Pipa PVC Type AW 3" batang 133,200.00

21 Pipa PVC Type AW 4" batang 199,800.00


22 seal tape bh 3,000.00

-
X BAHAN PAKU -

1 Paku Biasa 1/2" - 1" 1 Kg 21,650.00

2 Paku Biasa 1,5" - 2" 1 Kg 21,650.00

3 Paku Biasa 4" - 5" 1 Kg 21,650.00

4 Paku Ulin 1", 2" , 4" 1 Kg 27,500.00

5 Paku Jembatan Kg 20,900.00

6 Paku Besi Ukuran 1/2 " Kg 31,100.00

7 Paku Besi Ukuran 3/4 " Kg 31,100.00

8 Paku Besi Ukuran 1 " Kg 31,100.00

9 Paku Besi Ukuran 1,50 " Buah 3,615.00

10 Paku Gipsum Kg 22,500.00

11 Paku Genteng Metal bh 450.00

12 Skrub Fixer bh 500.00

XI BAHAN KAYU -

1 Kayu Kapur 10x10 cm x 4M 1 M3 1,665,000.00

2 Kayu Meranti 10 x 10 cm x 4M 1 M3 1,443,000.00

3 Papan Kapur 2 x 20 cm x 4M 1 M3 1,887,000.00


4 Papan Meranti 2 x 20 cm x 4M 1 M3 1,443,000.00

5 Balok Meranti 5 x 7 cm x 4M 1 M3 1,443,000.00


6 Balok Meranti 5 x 5 cm x 4M 1 M3 1,443,000.00

7 Kayu Reng 2 x 3 cm x 4M 1 M3 1,443,000.00

8 Kayu Untuk Perancah 1M3 1,221,000.00


9 Kayu Untuk Perancah 4m' 1 Bh 15,960.78

10 Kayu Untuk Konstruksi Jembatan 1M3 1,443,000.00

11 Balok Ulin 10/10 cm x 4 m 1M3 3,850,000.00

12 Balok Ulin 12/12 cm x 4 m 1M3 3,850,000.00

13 Balok Ulin 15/15 cm x 4 m 1M3 3,850,000.00

14 Balok Ulin 20/20 cm x 4 m 1M3 6,050,000.00

15 Balok Ulin 5/10 cm x 4 m 1M3 3,850,000.00

16 Papan Ulin Tebal = 2,5 cm 1M3 3,850,000.00

Page 151 Harga Material 2011


HARGA MATERIAL TAHUN 2012 ( Rp )
ZONA 1
NO URAIAN SATUAN TG.SELOR KETERANGAN
TG. PALAS

17 Papan Ulin Tebal = 5 cm 1M3 3,850,000.00

18 Papan Ulin 9 / 25 cm x 4 m 1M3 4,950,000.00

19 Kayu Bakar M3 49,500.00


20 Lem Kayu Kg 33,300.00

21 List kayu profil m' 8,325.00

-
XII ALUMINIUM -

1 Kusen aluminium 3" YKK ( Doff ) 1M' 80,100.00

2 Kusen aluminium 3" YKK ( Gloss ) 1M' 143,315.00


3 Kusen aluminium 4" YKK ( Doff ) 1M' 109,125.00

4 Kusen aluminium 4" YKK ( Gloss ) 1M' 150,075.00

5 Frame Daun Pintu Alumunium 1M' 100,000.00


6 Frame Daun Jendela Alumunium 1M' 90,000.00

7 Pintu swing standard tanpa kaca ( uk.90x210)Doff,merk YKK Bh 1,236,375.00

8 Pintu swing standard tanpa kaca ( uk.90x210)Gloss,merk YKK Bh 1,492,175.00


9 Pintu swing dg spandel Gloss Grendel(uk.85x210),Doff,merk YKK Bh 1,219,350.00

10 Pintu swing standard tanpa kaca ( uk.85x210)Gloss,merk YKK Bh 1,407,000.00

11 Pintu sliding standard tanpa kaca ( uk.90x210)Gloss,merk YKK Bh 1,028,425.00


12 Pintu Lipat Varia M2 1,904,775.00

13 Pintu swing standard tanpa kaca ( uk.90x210)Doff,merk YKK Bh 1,265,525.00

14 Jendela Casemen standard BV tanpa kaca (A 4,5m' ) Bh 600,350.00


15 Jendela Casemen standard BV tanpa kaca (A 4,5m' ) Bh 675,400.00

16 Jendela Casemen BV tanpa kaca (A 2,8m' )Gloss Bh 469,050.00

17 Jendela Casemen BV tanpa kaca (A 2,8m' )Doff Bh 515,875.00


18 Jendela Sliding ekonomi standard kaca ( A 4,5 m') Gloss Bh 375,250.00

19 Jendela Sliding ekonomi standard kaca ( A 4,5 m') Doff Bh 469,050.00


20 Louvre( Jalusi ) 7 cm,coklat,merk superex 1M' 30,050.00

21 Louvre( Jalusi ) 10 cm,coklat,merk superex 1M' 60,000.00

22 Plafon spandel,coklat,merk superex 1M2 431,425.00


23 Rangka curtain wall,coklat,merk superex 1M2 337,625.00

24 Spring Knip Bh 95,250.00

25 Rell Pintu Dorong / 5m' Bh 1,269,850.00

26 Sealent Kg 22,200.00

27 Sealent Tube 100,000.00

28 Profil Kaca m 7,500.00

29 Sunscren Alumunium M2 753,975.00

Page 152 Harga Material 2011


HARGA MATERIAL TAHUN 2012 ( Rp )
ZONA 1
NO URAIAN SATUAN TG.SELOR KETERANGAN
TG. PALAS

30 Rolling Door Alumunium M2 1,269,850.00

31 Pintu Alumunium M2 720,675.00

32 Rooling Door Besi M2 990,000.00


33 Puzzdith - 100 XR Ltr 41,625.00

34 Batu Granito Plasteran Kg 13,600.00

35 Batu Traso Plasteran Kg 13,600.00


36 Sabun Kg 16,950.00

37 Batu Bata Bali Bh 1,175.00

38 Pengadaan Rangka Baja Kg 42,350.00


39 Assumsi Pengelasan Cm 850.00

40 lempengan rumput biasa m2 38,850.00

41 kawat las listrik kg 27,750.00


42

43

Page 153 Harga Material 2011


HARGA MATERIAL TAHUN 2012 ( Rp )
ZONA 1
NO URAIAN SATUAN TG.SELOR KETERANGAN
TG. PALAS

XIII INSTALASI LISTRIK -

1 Lampu Pijar 14 Watt Bh 31,100

2 Saklar Tunggal Bh 13,325


3 Saklar Ganda Bh 16,650

4 Lampu TL Bh 77,700

5 Lampu SL 14 watt 55,500


6 Lampu SL 24 Watt Bh 65,000

7 Stop Kontak Bh 16,650

8 MCB Bh 44,400
9 Kabel NYA 2,5 mm m' 271,950
10 Fiting Lampu bh 22,200

XIV TANAMAN
1 Pupuk Kandang Zak 20,000.00
2 Tanaman Glodok Btg 250,000.00
3 Palem Kipas Btg 562,000.00
4 Rumput Gajah M2 50,000.00
5 Bunga Dadap Merah Btg 300,000.00

Tanjung Selor, Januari 2011


KEPALA DINAS PEKERJAAN UMUM
KABUPATEN BULUNGAN

H. ZAINAL ABIDIN, MD, ST, M.Si


NIP.19560106 197502 1 001

Page 154 Harga Material 2011


306281.25 278,437.50
169158 153,780.00

195536 177,760.00
474320 431,200.00

474320 431,200.00

474320 431,200.00
474320 431,200.00

474320 431,200.00

474320 431,200.00
474320 431,200.00

104544 95,040.00

117854 107,140.00
31339 28,490.00

72600 66,000.00

68062.5 61,875.00
19668.55 17,880.50

968 880.00

3025 2,750.00
7260 6,600.00

10890 9,900.00

10890 9,900.00

42735 38,850.00

9075 8,250.00
1897.5 1,725.00
75504 65000 68,640.00

17545 15,950.00

42735 38,850.00

23595 21,450.00

Page 155 Harga Material 2011


24420 22,200.00

16637.5 15,125.00

61710 56,100.00
957000 870,000.00

1760000 1,600,000.00

3300000 3,000,000.00
24420 22,200.00

3993 3,630.00

0
10780 9,800.00

33577.5 30,525.00

20130 18,300.00
33577.5 30,525.00

47025 42,750.00

4290 3,900.00
49720 45,200.00

71445 64,950.00

56787.5 51,625.00
29562.5 26,875.00

23815 21,650.00

13447.5 12,225.00
49720 45,200.00

87312.5 79,375.00
154467.5 140,425.00

30525 27,750.00

36630 33,300.00
67155 61,050.00

30910 28,100.00

18810 17,100.00

63140 57,400.00

103785 94,350.00

Page 156 Harga Material 2011


0
109890 99,900.00

147757.5 134,325.00

161177.5 146,525.00

180730 164,300.00

133237.5 121,125.00

164835 149,850.00

120890 109,900.00

133100 121,000.00

976800 888,000.00

2930400 2,664,000.00

235042.5 213,675.00

30910 28,100.00

134310 122,100.00

244200 222,000.00

152625 138,750.00

91575 83,250.00

91575 83,250.00

54945 49,950.00

79997.5 72,725.00

141652.5 128,775.00

15895 14,450.00

4895 4,450.00

9790 8,900.00

24420 22,200.00

40315 36,650.00

40315 36,650.00
205755 187,050.00

183150 166,500.00

137500 125,000.00
0

Page 157 Harga Material 2011


0

100320 91,200.00
59537.5 54,125.00

120890 109,900.00

213675 194,250.00
297632.5 270,575.00

134310 122,100.00

61050 55,500.00
61050 55,500.00

114180 103,800.00

33000 30,000.00

0
206057.5 187,325.00

82417.5 74,925.00

61050 55,500.00
61050 55,500.00

58630 53,300.00

54945 49,950.00
97680 88,800.00

100732.5 91,575.00

299145 271,950.00
409035 371,850.00

355932.5 323,575.00
334565 304,150.00

362642.5 329,675.00

267410 243,100.00
205150 186,500.00

4290 3,900.00

3850 3,500.00

6050 5,500.00

3850 3,500.00

262515 238,650.00

335775 305,250.00

Page 158 Harga Material 2011


0

293040 266,400.00
16802.5 15,275.00

549450 499,500.00

42735 38,850.00
30525 27,750.00

24420 22,200.00

22605 20,550.00
202400 184,000.00

19552.5 17,775.00

37620 34,200.00
27472.5 24,975.00

20157.5 18,325.00

24420 22,200.00
24420 22,200.00

24420

0
0

5500 5,000.00

11000 10,000.00
19085 17,350.00

118442.5 107,675.00
45787.5 41,625.00

119047.5 108,225.00
24117.5 21,925.00

26867.5 24,425.00

9157.5 8,325.00
39682.5 36,075.00

7947.5 7,225.00

114785 104,350.00

22962.5 20,875.00

Page 159 Harga Material 2011


48235 43,850.00

30525 27,750.00
26867.5 24,425.00

33577.5 30,525.00

53735 48,850.00
49582.5 45,075.00

51590 46,900.00

45787.5 41,625.00
52525 47,750.00

32367.5 29,425.00

112337.5 102,125.00
63690 57,900.00

16500 15,000.00

18150 16,500.00
15042.5 13,675.00

0
263752.5 239,775.00

1831500 1,665,000.00

1483515 1,348,650.00
699655 636,050.00

299145 271,950.00

1776555 1,615,050.00
832727.5 757,025.00

21367.5 19,425.00
73260 66,600.00

30525 27,750.00

427350 388,500.00
14657.5 13,325.00

18315 16,650.00

21010 19,100.00

33962.5 30,875.00

56663.75

79365 72,150.00

Page 160 Harga Material 2011


146520 133,200.00

219780 199,800.00

0
0

23815 21,650.00

23815 21,650.00

23815 21,650.00

30250 27,500.00

22990 20,900.00

34210 31,100.00

34210 31,100.00

34210 31,100.00

3976.5 3,615.00

24750 22,500.00

1831500 1,665,000.00

1587300 1,443,000.00 61.48

2075700 1,887,000.00 38.52


1587300 1,443,000.00

1587300 1,443,000.00 913500


1587300 1,443,000.00

1587300 1,443,000.00

1343100 1,221,000.00 (669,600.00)


17556.8627451 15,960.78 (0.22)

1587300 1,443,000.00 1888887

4235000 3,850,000.00

4235000 3,850,000.00

4235000 3,850,000.00

6655000 6,050,000.00 0.014

4235000 3,850,000.00 71.42857143

4235000 3,850,000.00

Page 161 Harga Material 2011


4235000 3,850,000.00

5445000 4,950,000.00

54450 49,500.00
36630 tp.tgh 33,300.00 tg plas timur peso hilir peso bunyu

9157.5 0.9140 8,325.00 0.9171 0.9160 0.9180 0.9178

0
0

88110 80,100.00

157646.5 143,315.00
120037.5 109,125.00

165082.5 150,075.00

1360012.5 1,236,375.00

1641392.5 1,492,175.00
1341285 1,219,350.00

1547700 1,407,000.00

1131267.5 1,028,425.00
2095252.5 1,904,775.00

1392077.5 1,265,525.00

660385 600,350.00
742940 675,400.00

515955 469,050.00

567462.5 515,875.00
412775 375,250.00

515955 469,050.00
33055 30,050.00

66000 60,000.00

474567.5 431,425.00
371387.5 337,625.00

104775 95,250.00

1396835 1,269,850.00

24420 22,200.00

829372.5 753,975.00

Page 162 Harga Material 2011


1396835 1,269,850.00

792742.5 720,675.00

45787.5 41,625.00

14960 13,600.00

14960 13,600.00
18645 16,950.00

1292.5 1,175.00

46585 42,350.00
935 850.00

42735 38,850.00

30525 27,750.00

Page 163 Harga Material 2011


34210 31,100.00

14657.5 77,700.00
18315 55,500.00

85470 16,650.00

61050
71500 13,325.00

18315 55,500.00

48840 16,650.00
299145 271,950.00
24420 22,200

Tanjung Selor, Januari 2011


KEPALA DINAS PEKERJAAN UMUM
KABUPATEN BULUNGAN

H. ZAINAL ABIDIN, MD, ST, M.Si


NIP.19560106 197502 1 001

Page 164 Harga Material 2011


HARGA SATUAN PIPA DAN ASSESORIES
KECAMATAN TANJUNG SELOR DAN TANJUNG PALAS 2012

HARGA SATUAN
BAHAN 2010
BAHAN 2012
NO URAIAN SATUAN ZONA 1 KETERANGAN
Kec.TG.Selor
/TG.Palas
1 PIPA Ø GIP
300 12 " Per Meter 789,579.50 Harga
200 8" Per Meter 732,325.00 Sudah
150 6" Per Meter 628,468.00 Termasuk
100 4" Per Meter 419,422.50 PPn 10 %
75 3" Per Meter 362,634.03
50 2" Per Meter 151,125.25
40 1.1/2 " Per Meter 84,017.65
25 1" Per Meter 39,279.25
20 3/4 " Per Meter 34,752.15
12.5 1/2 " Per Meter 22,262.68

PIPA Ø PVC RRJ S. 12,5


300 Per Meter 399,994.25
200 Per Meter 247,648.61
150 Per Meter 171,823.62
100 Per Meter 146,780.50
75 Per Meter 86,190.07
50 Per Meter 44,729.80
40 Per Meter 26,190.93
25 Per Meter 15,651.96
-
PIPA Ø PVC SC S. 12,5 -
300 Per Meter 399,994.25
200 Per Meter 247,648.61
150 Per Meter 171,823.62
100 Per Meter 146,780.50
75 Per Meter 86,190.07
50 Per Meter 44,729.80
40 Per Meter 26,190.93
25 Per Meter 15,651.96
20 Per Meter 9,182.48
12.5 Per Meter 6,295.57

HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO URAIAN SATUAN ZONA 1 KETERANGAN
Kec.TG.Selor
/TG.Palas
PIPA Ø PVC RRJ S. 10
300 Per Meter 429,029.27 Harga
200 Per Meter 283,357.85 Sudah
150 Per Meter 184,565.87 Termasuk
100 Per Meter 173,061.71 PPn 10 %
75 Per Meter 96,134.83
50 Per Meter 59,458.13
40 Per Meter 37,276.67
25 Per Meter 22,249.37
PIPA Ø PVC SC S. 10 -
300 Per Meter 429,029.27
200 Per Meter 283,357.85

Page 165 Daftar Harga Pipa dan Assesories 2012


150 Per Meter 184,565.87
100 Per Meter 173,061.71
75 Per Meter 96,134.83
50 Per Meter 59,458.13
40 Per Meter 37,276.67
25 Per Meter 22,249.37
20 Per Meter 14,412.16
12.5 Per Meter 9,666.69
-

Page 166 Daftar Harga Pipa dan Assesories 2012


2 GATE VALVE -
200 Per Buah 9,508,907.25
150 Per Buah 7,276,381.20
100 Per Buah 4,054,065.98
75 Per Buah 2,728,642.95
50 Per Buah 1,975,408.07
-
3 FLANGE SOCKED -
200 Per Buah 724,294.72
150 Per Buah 486,697.87
100 Per Buah 288,862.27
75 Per Buah 216,314.16
50 Per Buah 141,573.07
-
4 FLANGE SPIGOTE -
200 Per Buah 648,187.52
150 Per Buah 485,763.16

HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO URAIAN SATUAN ZONA 1 KETERANGAN
Kec.TG.Selor
/TG.Palas
100 Per Buah 463,761.45
75 Per Buah 158,397.90 Harga
50 Per Buah 146,678.04 Sudah
- Termasuk
5 FLANGE LAS - PPn 10 %
300 Per Buah 705,348.81
250 Per Buah 546,303.80
200 Per Buah 344,621.49
150 Per Buah 239,250.58
100 Per Buah 166,437.50
75 Per Buah 128,343.29
50 Per Buah 75,352.25
-
6 BLIND FLANGE -
300 Per Buah 904,514.58
250 Per Buah 668,679.30
200 Per Buah 465,918.48
150 Per Buah 336,065.27
100 Per Buah 220,696.13
75 Per Buah 126,977.17
50 Per Buah 97,785.36
-
7 ALL SOCKET TEE -
RRJ -
200 X200 Per Buah 823,985.46
X150 Per Buah 712,538.91
X100 Per Buah 634,382.52
X75 Per Buah 353,285.56
X50 Per Buah -
-
150 X150 Per Buah 813,847.42
X100 Per Buah 729,076.14
X75 Per Buah 665,883.15
X50 Per Buah 554,248.86
Per Buah -
100 X100 Per Buah 501,725.18
X75 Per Buah 469,801.13
X50 Per Buah 466,997.00

Page 167 Daftar Harga Pipa dan Assesories 2012


HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO URAIAN SATUAN ZONA 1 KETERANGAN
Kec.TG.Selor
/TG.Palas
75 X75 Per Buah 437,769.24
X50 Per Buah 405,953.05 Harga
- Sudah
50 X50 Per Buah 169,398.76 Termasuk
- PPn 10 %
200 X200 Per Buah 756,074.97
X150 Per Buah 644,412.71
X100 Per Buah 583,440.66
X75 Per Buah 169,398.76
X50 Per Buah -
-
150 X150 Per Buah 756,074.97
X100 Per Buah 644,412.71
X75 Per Buah 583,440.66
X50 Per Buah 169,398.76
-
100 X100 Per Buah 409,835.70
X75 Per Buah 284,620.11
X50 Per Buah 284,620.11
-
75 X75 Per Buah 215,703.00
X50 Per Buah 156,456.58
-
50 X50 Per Buah 105,135.24
-
7 ALL FLANGE TEE -
CI -
200 X200 Per Buah 1,233,533.56
X150 Per Buah 1,011,934.67
X100 Per Buah 888,480.66
X75 Per Buah 866,407.05
X50 Per Buah 862,495.64
-
150 X150 Per Buah 841,241.70
X100 Per Buah 776,530.80
X75 Per Buah 830,456.55
X50 Per Buah 737,344.76

HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO URAIAN SATUAN ZONA 1 KETERANGAN
Kec.TG.Selor
/TG.Palas
100 X100 Per Buah 663,286.73
X75 Per Buah 554,033.16 Harga
X50 Per Buah 525,668.21 Sudah
- Termasuk
75 X75 Per Buah 458,368.88 PPn 10 %
X50 Per Buah 419,542.34
-
50 X50 Per Buah 350,517.38
-
ALL FLANGE TEE -
GIV -

Page 168 Daftar Harga Pipa dan Assesories 2012


200 X200 Per Buah 1,295,210.23
X150 Per Buah 1,062,531.41
X100 Per Buah 932,904.69
X75 Per Buah 909,727.40
X50 Per Buah 905,620.42
-
150 X150 Per Buah 883,303.79
X100 Per Buah 815,357.34
X75 Per Buah 871,979.38
X50 Per Buah 774,211.99
-
100 X100 Per Buah 696,451.06
X75 Per Buah 581,734.81
X50 Per Buah 551,951.62

Page 169 Daftar Harga Pipa dan Assesories 2012


-
75 X75 Per Buah 481,287.32
X50 Per Buah 440,519.45
Per Buah -
50 X50 Per Buah 368,043.24
-
8 BEND RRJ -
90 x300 Per Buah 1,028,831.41
X200 Per Buah 963,761.00
X150 Per Buah 455,708.54
X100 Per Buah 204,673.39
X75 Per Buah 100,763.07
X50 Per Buah 50,086.24

HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO URAIAN SATUAN ZONA 1 KETERANGAN
Kec.TG.Selor
/TG.Palas
45 ; 22,5 X200 Per Buah 665,659.46
X150 Per Buah 393,154.67 Harga
X100 Per Buah 140,206.95 Sudah
X75 Per Buah 84,124.17 Termasuk
X50 Per Buah 40,965.59 PPn 10 %
-
BEND SC -
90 x300 Per Buah 756,398.52
X200 Per Buah 884,669.90
X150 Per Buah 399,553.86
X100 Per Buah 163,466.92
X75 Per Buah 90,091.95
X50 Per Buah 80,025.81
-
45 ; 22,5 X200 Per Buah 639,918.90
X150 Per Buah 340,415.28
X100 Per Buah 114,682.10
X75 Per Buah 64,171.64
X50 Per Buah 31,458.49
-
BEND CI -
90 x300 Per Buah 1,159,124.01
X200 Per Buah 1,064,638.11
X150 Per Buah 573,050.97
X100 Per Buah 237,273.30
X75 Per Buah 183,347.55
X50 Per Buah 161,777.25
45 ; 22,5 X200 Per Buah 683,059.50
X150 Per Buah 523,279.50
X100 Per Buah 226,488.15
X75 Per Buah 204,917.85
X50 Per Buah 152,989.35
BEND GIP -
90 x300 Per Buah 1,316,147.81
X200 Per Buah 1,266,392.31
X150 Per Buah 690,537.20
X100 Per Buah 392,148.05
X75 Per Buah 347,713.24
X50 Per Buah 331,032.20

Page 170 Daftar Harga Pipa dan Assesories 2012


HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO URAIAN SATUAN ZONA 1 KETERANGAN
Kec.TG.Selor
/TG.Palas
45 ; 22,5 X200 Per Buah 1,047,669.47
X150 Per Buah 828,011.92 Harga
X100 Per Buah 511,216.11 Sudah
X75 Per Buah 496,116.90 Termasuk
X50 Per Buah 288,323.01 PPn 10 %

Page 171 Daftar Harga Pipa dan Assesories 2012


-
9 DOP -
200 Per Buah 122,231.70
150 Per Buah 107,851.50
100 Per Buah 79,091.10
75 Per Buah 58,958.82
50 Per Buah 48,533.18
25 Per Buah 18,334.76
-
10 CLAMB SADLE -
75 X 1/2 Per Buah 54,644.76
50 X 1/2 Per Buah 45,297.63
-
11 WATER METER INDUK -
500 20" Per Buah 156,093,115.81
400 16" Per Buah 103,294,550.64
300 12" Per Buah 74,457,639.83
250 10" Per Buah 27,762,803.24
200 8" Per Buah 19,454,208.79
150 6" Per Buah 15,493,918.81
100 4" Per Buah 9,979,083.72
75 3" Per Buah 8,383,892.66
50 2" Per Buah 7,230,944.60
40 1. 1/2" Per Buah 4,213,166.80
30/32 1. 3/4" Per Buah 3,060,276.76
25 1" Per Buah 2,544,692.96
20 3/4" Per Buah 952,457.99
15 1/2" Per Buah 270,703.80
-
13 REDUCER RRJ -
200 X 150 Per Buah 333,368.99
X 100 Per Buah 324,633.02
150 X 100 Per Buah 281,600.27
X 75 Per Buah 281,600.27

HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO URAIAN SATUAN ZONA 1 KETERANGAN
Kec.TG.Selor
/TG.Palas
100 X 75 Per Buah 193,773.20
X 50 Per Buah 193,773.20 Harga
75 X 50 Per Buah 104,220.50 Sudah
50 X 32 Per Buah 85,022.93 Termasuk
50 X 25 Per Buah 75,402.58 PPn 10 %
25 X 3/4 Per Buah 53,997.65
3/4 X 1/2 Per Buah 34,152.98
-
REDUCER -
200 X 150 Per Buah 323,734.25
X 100 Per Buah 310,432.57
150 X 100 Per Buah 237,956.36
X 75 Per Buah 209,483.56
100 X 75 Per Buah 176,013.65
X 50 Per Buah 129,421.80
75 X 50 Per Buah 94,909.32
50 X 32 Per Buah 82,470.45
50 X 25 Per Buah 71,541.50
25 X 3/4 Per Buah 50,977.81
3/4 X 1/2 Per Buah 32,247.60
-
REDUCER GIP -
200 X 150 Per Buah 1,022,432.22
X 100 Per Buah 931,836.96

Page 172 Daftar Harga Pipa dan Assesories 2012


150 X 100 Per Buah 683,059.50
X 75 Per Buah 554,284.81
100 X 75 Per Buah 366,695.10
X 50 Per Buah 323,554.50
75 X 50 Per Buah 266,033.70
50 X 32 Per Buah 194,815.76
50 X 25 Per Buah 110,727.54
25 X 3/4 Per Buah 108,211.01
3/4 X 1/2 Per Buah 104,615.96
-
REDUCER FLANGE / CI -
200 X 150 Per Buah 553,206.29
X 100 Per Buah 485,475.55
150 X 100 Per Buah 410,842.31
X 75 Per Buah 338,509.91

Page 173 Daftar Harga Pipa dan Assesories 2012


HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO URAIAN SATUAN ZONA 1 KETERANGAN
Kec.TG.Selor
/TG.Palas
100 X 75 Per Buah 269,628.75
X 50 Per Buah 238,279.91 Harga
75 X 50 Per Buah 136,611.90 Sudah
50 X 32 Per Buah 125,826.75 Termasuk
50 X 25 Per Buah 102,710.58 PPn 10 %
25 X 3/4 Per Buah 79,450.61
3/4 X 1/2 Per Buah 71,541.50
-
14 KARET PACKING -
300 Per Buah 119,930.87
250 Per Buah 113,459.78
200 Per Buah 79,091.10
150 Per Buah 67,586.94
100 Per Buah 49,611.69
75 Per Buah 41,271.17
50 Per Buah 27,897.59
-
15 GIBOULT JOINT -
200 Per Buah 698,158.71
150 Per Buah 540,192.21
100 Per Buah 353,321.51
75 Per Buah 266,752.71
50 Per Buah 252,516.31
-
16 PUDDLE PIPE GIV -
300 Per Buah 1,078,515.00
250 Per Buah 682,196.69
200 Per Buah 438,236.60
150 Per Buah 426,660.53
100 Per Buah 395,455.50
-
17 BAUT -
3/4 ' - 7.5 CM Per Buah 9,490.93
5/8 ' - 7.5 CM Per Buah 7,909.11
-
18 STREET BOX Per Buah 186,942.60
-

HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO URAIAN SATUAN ZONA 1 KETERANGAN
Kec.TG.Selor
/TG.Palas
19 STOP KRAN
50 Per Buah 179,752.50 Harga
40 Per Buah 115,041.60
25 Per Buah 50,330.70 Sudah
- Termasuk
20 Dresser Joint Ø 75 mm CI Per Buah 347,012.20 PPn 10 %
Dresser Joint Ø 100 mm CI Per Buah 444,887.44
-
21 Flexible Joint Ø 50 mm CI Per Buah 252,696.06
Flexible Joint Ø 75 mm CI Per Buah 293,625.71
-
22 Pasir Silika Per Kilogramm 6,471.09

Page 174 Daftar Harga Pipa dan Assesories 2012


23 Nosel Per Buah 35,950.50
-
Bahan Kimia Gramm 30,787.50

Tanjung Selor, 2012


KEPALA DINAS PEKERJAAN UMUM
KABUPATEN BULUNGAN

H. ZAINAL ABIDIN, MD, ST, M.Si


NIP. 195601061975021001

Page 175 Daftar Harga Pipa dan Assesories 2012


ZONA I KOEFISIEN 1

TANJUNG SELOR
KM 9
KM 12
TANJUNG BUKA-TRANS
TANJUNG PALAS
TERAS
SALIM BATU

ZONA I KOEFISIEN 1.15

KLUBIR
PIMPING
KARANG AGUNG
SEPATUNG ( PANCA AGUNG )
ARDIMULYO
MENTADAU
RUHUI RAHAYU
TANJUNG AGUNG
WONOMULYO
SAJAU PUNGIT
SAJAU TENGAH
SAJAU HILIR
BINAI

Page 176 Daftar Harga Pipa dan Assesories 2012


ZONA 1
1 KECAMATAN TANJUNG SELOR
2 KECAMATAN TANJUNG PALAS

ZONA 2
1 KECAMATAN TANJUNG PALAS TENGAH

2 KECAMATAN TANJUNG PALAS UTARA

ZONA 3
1 KECAMATAN SEKATAK

ZONA 4
1 KECAMATAN TANJUNG PALAS BARAT

KECAMATAN PESO HILIR

ZONA 5
KECAMATAN PESO

Page 177 Daftar Harga Pipa dan Assesories 2012


ZONA 6
KECAMATAN TANJUNG PALAS TIMUR

ZONA 7
KECAMATAN BUNYU

Page 178 Daftar Harga Pipa dan Assesories 2012


90,000.00 7,500.00
90,000.00
75,000.00 6,250.00
75,000.00

Page 179 Daftar Harga Pipa dan Assesories 2012


Page 180 Daftar Harga Pipa dan Assesories 2012
Page 181 Daftar Harga Pipa dan Assesories 2012
Page 182 Daftar Harga Pipa dan Assesories 2012
Page 183 Daftar Harga Pipa dan Assesories 2012
Page 184 Daftar Harga Pipa dan Assesories 2012
Page 185 Daftar Harga Pipa dan Assesories 2012
Page 186 Daftar Harga Pipa dan Assesories 2012
Page 187 Daftar Harga Pipa dan Assesories 2012
Page 188 Daftar Harga Pipa dan Assesories 2012
Page 189 Daftar Harga Pipa dan Assesories 2012
Page 190 Daftar Harga Pipa dan Assesories 2012
Page 191 Daftar Harga Pipa dan Assesories 2012
Page 192 Daftar Harga Pipa dan Assesories 2012
Page 193 Daftar Harga Pipa dan Assesories 2012
Page 194 Daftar Harga Pipa dan Assesories 2012
DAFTAR HARGA UPAH TAHUN 2014
DINAS PEKERJAAN UMUM KABUPATEN BULUNGAN
PROPINSI : KALIMANTAN TIMUR
KABUPATEN : BULUNGAN
TAHUN ANGGARAN : 2014

DAFTAR UPAH TAHUN 2012 ( Rp )


ZONA 1
NO URAIAN SATUAN KETERANGAN
TG.SELOR
TG. PALAS
1 2 3 4 10

1 Mandor Lapangan Hari 77,000.00


2 Mekanik Hari 71,500.00
3 Pembantu Mekanik Hari 49,500.00
4 Tukang Hari 60,500.00
5 Kepala Tukang Hari 71,500.00
6 Operator Terlatih Hari 66,000.00
7 Operator Kurang Terlatih Hari 55,000.00
8 Pembantu Operator Hari 49,500.00
9 Sopir Truk Hari 66,000.00
10 Sopir Personil Hari 66,000.00
11 Pembantu Sopir / Kernek Hari 49,500.00
12 Buruh Lapangan Terlatih Hari 49,500.00
13 Buruh Lapangan Agak Terlatih Hari 46,750.00
14 Buruh Lapangan Tidak Terlatih Hari 44,000.00

Tanjung Selor, Januari 2011


KEPALA DINAS PEKERJAAN UMUM
KABUPATEN BULUNGAN

H. ZAINAL ABIDIN, MD, ST, M.Si


NIP.19560106 197502 1 001
PEMERINTAH KABUPATEN BULUNGAN
DINAS PEKERJAAN UMUM
Jalan Teratai Telepon (0552) 21020 Tanjung Selor

PERHITUNGAN VOLUME
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN MARKAS PEMADAMAN KEBAKARAN
LOKASI : TANJUNG SELOR
TAHUN ANGGARAN : 2012

NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
I PEKERJAAN PERSIAPAN
1 Pembuatan papan nama proyek 1.00 Bh
2 Pembongkaran dan pembersihan bangunan lama 1.00 Ls
3 Pasang pagar seng gelombang (pengaman proyek) 200.00 M1
4 Pengukuran dan pasang bowplank 135.60 M1
5 Pembuatan direksikeet dan perlengkapannya 24.00 M2
6 Pelaporan Kegiatan dan Asbuilt drawing 1.00 Ls

II PEKERJAAN TANAH DAN URUGAN


1 Urugan tanah peninggian peil lantai 868.14 M3
Luas Bangunan 667.80 m2
Tinggi timbunan 1.30 m
2 Galian tanah pondasi menerus 246.38 M3
Panjang Gali memanjang 177.20 m
melintang 165.00 m
Total panjang 342.20 m
Lebar galian 0.90 m
Tinggi galian 0.80 m
3 Galian tanah pondasi setempat 226.80 M3
Jumlah poorplate 50 bh
Luas Poorplate 3.24 M2
tinggi galian 1.4 M
4 Urugan tanah kembali 94.64 M3
5 Urugan pasir bawah pondasi dan lantai, tebal 10 cm 97.58 M3
Tebal Urugan 0.1 m

III PEKERJAAN PONDASI


1 Pengadaan tiang pancang beton pre cast 25/25 K 500 4,664.00 M1
Jumlah Pancang isi 5 60 bh
jumlah Pancang isi 4 152 bh
kedalaman pancang 22 m
2 Pemancangan tiang pancang beton 25/25 4,664.00 M1
3 Penyambungan tiang pancang 636.00 cm
4 Beton lantai kerja bawah pile cap, t = 3 cm (1:3:5) 4.51 M3
5 Beton pile cap (K.225 ) 75.13 M3
- Pasang begisting 173.20 M2
- bongkar begisting 173.20 M2
- Besi beton ulir Ø 19 9,062.63 Kg
5 Aanstampeng batu gunung tinggi 20 cm 61.60 M3
Luas 0.18 m2
6 Pasangan Batu gunung cam 1:4 164.26 M3
Luas 0.48 m2

IV PEKERJAAN BETON
A LANTAI 1
1 Sloof S 30/40 ( K.225 ) 48.14 M3
- Pasang begisting 320.96 M2
- Bongkar begisting 320.96 M2
- Besi beton ulir Ø19 8,946.76 Kg
- Besi beton polos Ø12 3,341.37 Kg

2 Sloof S1 20/30 (K.225 ) 4.58 M3


- Pasang begisting 45.84 M2
- Bongkar begisting 45.84 M2
- Besi beton ulir Ø13 397.28 Kg
- Besi beton polos Ø10 314.88 Kg
3 Balok Gantung 15/30 0.36 M3
- Pasang begisting 6.00 M2
- Bongkar begisting 6.00 M2
- Besi beton polos Ø12 42.82 Kg
- Besi beton polos Ø10 30.17 Kg

4 Beton Bo lantai kerja bawah sloof, t = 3 cm ( 1:3:5 ) 12.04 M3


5 Beton bertulang plat lantai dasar, t = 15 cm ( K.225 ) 101.07 M3
- Pasang begisting 88.40 M2
- Bongkar begisting 88.40 M2
- Besi beton polos Ø 12 ### Kg

6 Beton Kolom K1 40/60 ( K.225 ) 19.68 M3


- Pasang begisting 164.00 M2
- Bongkar begisting 164.00 M2
- Besi beton ulir Ø19 2,560.04 Kg
- Besi beton polos Ø12 975.25 Kg

7 Beton Kolom K2 40/40 ( K.225 ) 19.01 M3


- Pasang begisting 190.08 M2
- Bongkar begisting 190.08 M2
- Besi beton ulir Ø19 3,179.09 Kg
- Besi beton polos Ø12 1,130.34 Kg

8 Beton Kolom K3 40/40 ( K.225 ) 21.15 M3


- Pasang begisting 211.52 M2
- Bongkar begisting 211.52 M2
- Besi beton ulir Ø19 3,537.67 Kg
- Besi beton polos Ø12 1,257.84 Kg

9 Beton Kolom K6 30/80 ( K.225 ) 3.98 M3


- Pasang begisting 36.52 M2
- Bongkar begisting 36.52 M2
- Besi beton ulir Ø19 666.32 Kg
- Besi beton polos Ø12 217.17 Kg

###Kolom K4 10/20 ( 1:2:3 ) 1.29 m3


- Pasang begisting 25.76 M2
- Bongkar begisting 25.76 M2
- Besi beton polos Ø12 344.67 Kg
- Besi beton polos Ø 8 67.83 Kg

###Kolom K5 15/50 ( 1:2:3 ) 1.38 m3


- Pasang begisting 23.92 M2
- Bongkar begisting 23.92 M2
- Besi beton polos Ø12 164.13 Kg
- Besi beton polos Ø 10 62.99 Kg

###Plat kanopi t = 10 cm ( 1:2:3 ) 1.44 M3


- Pasang begisting 18.00 M2
- Bongkar begisting 18.00 M2
- Besi beton polos Ø12 214.08 Kg

###Beton Tangga Utama ( K.225 ) 3.25 M3


- Pasang begisting 21.65 M2
- Bongkar begisting 21.65 M2
- Besi beton ulir Ø13 600.29 Kg

###Beton Tangga Darurat ( K.225 ) 1.20 M3


- Pasang begisting 7.99 M2
- Bongkar begisting 7.99 M2
- Besi beton ulir Ø13 221.64 Kg

###Balok Latei 15/25 ( 1:2:3 ) 0.68 M3


- Pasang begisting 11.70 M2
- Bongkar begisting 11.70 M2
- Besi beton polos Ø12 96.34 Kg
- Besi beton polos Ø 8 38.24 Kg

###Beton parit keliling bangunan ( 1:2:3) 15.18 M3


- Pasang begisting 193.20 M2
- Bongkar begisting 193.20 M2
- Besi beton polos Ø12 1,016.88 Kg

###Beton lantai kerja (Bo) parit keliling bangunan 1.66 M3


B LANTAI 2
1 Plat lantai 2, t = 12 cm ( K.225 ) 10.80 M3
- Pasang begisting 90.00 M2
- Bongkar begisting 90.00 M2
- Besi beton polos Ø 12 2,140.80 Kg

2 Balok Lantai B1 30/60 ( K.225 ) 24.30 M3


- Pasang begisting 202.50 M2
- Bongkar begisting 202.50 M2
- Besi beton ulir Ø19 4,816.80 Kg
- Besi beton polos Ø 12 1,446.65 Kg

3 Balok Lantai B2 30/50 ( K.225 ) 3.75 M3


- Pasang begisting 32.50 M2
- Bongkar begisting 32.50 M2
- Besi beton ulir Ø19 836.25 Kg
- Besi beton polos Ø 12 239.29 Kg

4 Balok Lantai B3 25/40 ( K.225 ) 1.50 M3


- Pasang begisting 15.75 M2
- Bongkar begisting 15.75 M2
- Besi beton ulir Ø19 401.40 Kg
- Besi beton polos Ø 12 117.12 Kg

5 Balok Lantai BA 25/35 ( K.225 ) 1.58 M3


- Pasang begisting 17.10 M2
- Bongkar begisting 17.10 M2
- Besi beton ulir Ø19 240.84 Kg
- Besi beton polos Ø 12 129.52 Kg

6 Balok Gantung 15/30 ( 1 : 2 3 ) 0.36 M3


- Pasang begisting 6.00 M2
- Bongkar begisting 6.00 M2
- Besi beton polos Ø12 57.09 Kg
- Besi beton polos Ø10 30.17 Kg

7 Beton Kolom K1 40/60 ( K.225 ) 3.22 M3


- Pasang begisting 26.80 M2
- Bongkar begisting 26.80 M2
- Besi beton ulir Ø19 418.35 Kg
- Besi beton polos Ø12 159.37 Kg

8 Beton Kolom K2 40/40 ( K.225 ) 5.36 M3


- Pasang begisting 53.60 M2
- Bongkar begisting 53.60 M2
- Besi beton ulir Ø19 896.46 Kg
- Besi beton polos Ø12 333.01 Kg

9 Beton Kolom K3 40/40 ( K.225 ) 10.72 M3


- Pasang begisting 107.20 M2
- Bongkar begisting 107.20 M2
- Besi beton ulir Ø19 1,792.92 Kg
- Besi beton polos Ø12 666.03 Kg

###Beton Kolom K4 10/20 ( 1:2:3 ) 0.94 M3


- Pasang begisting 28.14 M2
- Bongkar begisting 28.14 M2
- Besi beton polos Ø12 167.34 Kg
- Besi beton polos Ø8 206.45 Kg

###Kolom K5 15/50 ( 1:2:3 ) 1.01 m3


- Pasang begisting 17.42 M2
- Bongkar begisting 17.42 M2
- Besi beton polos Ø12 119.53 Kg
- Besi beton polos Ø 10 71.65 Kg

###Ringbalk pagar void 10/10 ( 1:2:3 ) 0.06 M3


- Pasang begisting 1.20 M2
- Bongkar begisting 1.20 M2
- Besi beton polos Ø12 21.41 Kg
- Besi beton polos Ø8 6.48 Kg

###Plat kanopi t = 10 cm ( 1:2:3 ) 8.05 M3


- Pasang begisting 100.60 M2
- Bongkar begisting 100.60 M2
- Besi beton polos Ø12 1,196.47 Kg

###Beton Tangga Utama ( K.225 ) 3.25 M3


- Pasang begisting 21.65 M2
- Bongkar begisting 21.65 M2
- Besi beton ulir Ø13 600.29 Kg

###Beton Tangga Darurat ( K.225 ) 1.20 M3


- Pasang begisting 7.99 M2
- Bongkar begisting 7.99 M2
- Besi beton ulir Ø13 221.64 Kg

###Balok Latei 15/25 ( 1:2:3 ) 0.23 M3


- Pasang begisting 3.90 M2
- Bongkar begisting 3.90 M2
- Besi beton polos Ø12 32.11 Kg
- Besi beton polos Ø 8 12.96 Kg

C LANTAI 3
1 Plat lantai 3, t = 12 cm ( K.225 ) 81.94 M3
- Pasang begisting 682.80 M2
- Bongkar begisting 682.80 M2
- Besi beton polos Ø12 ### Kg

2 Balok Lantai B1 30/60 ( K.225 ) 35.82 M3


- Pasang begisting 298.50 M2
- Bongkar begisting 298.50 M2
- Besi beton ulir Ø19 7,100.32 Kg
- Besi beton polos Ø12 2,131.70 Kg

3 Balok Lantai B2 30/50 ( K.225 ) 25.98 M3


- Pasang begisting 225.16 M2
- Bongkar begisting 225.16 M2
- Besi beton ulir Ø19 5,793.54 Kg
- Besi beton polos Ø12 1,649.37 Kg

4 Balok Lantai B3 25/40 ( K.225 ) 18.06 M3


- Pasang begisting 189.63 M2
- Bongkar begisting 189.63 M2
- Besi beton ulir Ø19 4,832.86 Kg
- Besi beton polos Ø12 1,397.32 Kg

5 Balok Lantai BA 25/35 ( K.225 ) 0.70 M3


- Pasang begisting 7.60 M2
- Bongkar begisting 7.60 M2
- Besi beton ulir Ø19 107.04 Kg
- Besi beton polos Ø 12 58.16 Kg

5 Balok Gantung 15/30 ( 1 : 2 3 ) 0.72 M3


- Pasang begisting 12.00 M2
- Bongkar begisting 12.00 M2
- Besi beton polos Ø12 114.18 Kg
- Besi beton polos Ø10 59.79 Kg
6 Beton Kolom K1 40/60 ( K.225 ) 13.44 M3
- Pasang begisting 112.00 M2
- Bongkar begisting 112.00 M2
- Besi beton ulir Ø19 1,748.32 Kg
- Besi beton polos Ø12 666.03 Kg

7 Beton Kolom K2 & K3 40/40 ( K.225 ) 24.32 M3


- Pasang begisting 243.20 M2
- Bongkar begisting 243.20 M2
- Besi beton ulir Ø19 4,067.52 Kg
- Besi beton polos Ø12 1,594.24 Kg

8 Beton Kolom K4 10/20 5.20 M3


- Pasang begisting 156.00 M2
- Bongkar begisting 156.00 M2
- Besi beton polos Ø12 927.68 Kg
- Besi beton polos Ø 8 426.21 Kg

9 Kolom K5 15/50 ( 1:2:3 ) 1.20 m3


- Pasang begisting 20.80 M2
- Bongkar begisting 20.80 M2
- Besi beton polos Ø12 142.72 Kg
- Besi beton polos Ø 10 54.77 Kg

###Kolom Sirip 10/50 ( 1:2:3 ) 11.38 M3


- Pasang begisting 273.00 M2
- Bongkar begisting 273.00 M2
- Besi beton polos Ø12 1,623.44 Kg
- Besi beton polos Ø 8 749.71 Kg

###Ringbalk pagar void 10/10 ( 1:2:3 ) 0.04 M3


- Pasang begisting 0.80 M2
- Bongkar begisting 0.80 M2
- Besi beton polos Ø12 14.27 Kg
- Besi beton polos Ø 8 4.37 Kg

###Balok Latei 15/25 ( 1:2:3 ) 3.77 M3


- Pasang begisting 65.39 M2
- Bongkar begisting 65.39 M2
- Besi beton polos Ø12 538.41 Kg
- Besi beton polos Ø 8 212.25 Kg

###Plat kanopi t = 10 cm ( 1:2:3 ) 10.06 M3


- Pasang begisting 100.60 M2
- Bongkar begisting 100.60 M2
- Besi beton polos Ø12 1,196.47 Kg

###Beton Tangga Utama ( K.225 ) 3.81 M3


- Pasang begisting 25.40 M2
- Bongkar begisting 25.40 M2
- Besi beton ulir Ø13 704.40 Kg

###Beton meja pantri, t = 7 cm ( 1:2:3 ) 0.24 M3


- Pasang begisting 3.96 M2
- Bongkar begisting 3.96 M2
- Besi beton polos Ø12 21.17 Kg

D DAK (LANTAI 4)
1 Plat lantai 4, t = 12 cm ( K.225 ) 80.14 M3
- Pasang begisting 667.80 M2
- Bongkar begisting 667.80 M2
- Besi beton polos Ø12 ### Kg

2 Balok Lantai B1 30/60 ( K.225 ) 33.66 M3


- Pasang begisting 280.50 M2
- Bongkar begisting 280.50 M2
- Besi beton ulir Ø19 6,672.16 Kg
- Besi beton polos Ø12 2,003.25 Kg

3 Balok Lantai B2 30/50 ( K.225 ) 25.23 M3


- Pasang begisting 218.66 M2
- Bongkar begisting 218.66 M2
- Besi beton ulir Ø19 5,626.29 Kg
- Besi beton polos Ø12 1,601.79 Kg
4 Balok Lantai B3 25/40 ( K.225 ) 18.06 M3
- Pasang begisting 189.63 M2
- Bongkar begisting 189.63 M2
- Besi beton ulir Ø19 4,832.86 Kg
- Besi beton polos Ø12 1,397.32 Kg

5 Balok Lantai BA 25/35 ( K.225 ) 0.70 M3


- Pasang begisting 7.60 M2
- Bongkar begisting 7.60 M2
- Besi beton ulir Ø19 107.04 Kg
- Besi beton polos Ø12 58.16 Kg

6 Beton Kolom K1 40/60 ( K.225 ) 2.16 M3


- Pasang begisting 18.00 M2
- Bongkar begisting 18.00 M2
- Besi beton ulir Ø19 280.98 Kg
- Besi beton polos Ø12 107.04 Kg

7 Beton Kolom K2 40/40 ( K.225 ) 3.68 M3


- Pasang begisting 36.80 M2
- Bongkar begisting 36.80 M2
- Besi beton ulir Ø19 615.48 Kg
- Besi beton polos Ø12 218.84 Kg

8 Beton Kolom K4"20/20 ( K.225 ) 2.44 M3


- Pasang begisting 48.80 M2
- Bongkar begisting 48.80 M2
- Besi beton ulir Ø12 652.94 Kg
- Besi beton polos Ø8 128.51 Kg

9 Beton Kolom K4 10/20 0.32 M3


- Pasang begisting 9.60 M2
- Bongkar begisting 9.60 M2
- Besi beton polos Ø12 57.09 Kg
- Besi beton polos Ø 8 26.23 Kg

###Beton Kolom Praktis 10/10 0.30 M3


- Pasang begisting 12.00 M2
- Bongkar begisting 12.00 M2
- Besi beton polos Ø12 107.04 Kg
- Besi beton polos Ø 8 34.76 Kg

###Balok 20/35 ( 1:2:3 ) 3.57 M3


- Pasang begisting 35.70 M2
- Bongkar begisting 35.70 M2
- Besi beton polos Ø12 272.95 Kg
- Besi beton polos Ø 8 148.16 Kg

###Ringbalk 15/20 ( 1:2:3 ) 4.34 M3


- Pasang begisting 57.84 M2
- Bongkar begisting 57.84 M2
- Besi beton polos Ø12 773.90 Kg
- Besi beton polos Ø 8 266.82 Kg

###Beton plat dak teras atap t = 10 cm ( K.225 ) 13.20 M3


- Pasang begisting 132.00 M2
- Bongkar begisting 132.00 M2
- Besi beton polos Ø12 1,569.92 kg

Jumlah IV (A+B+C+D)
V PEKERJAAN DINDING & PLESTERAN
A LANTAI 1
1 Pasangan bata merah 1 : 2 49.60 M2
2 Pasangan bata merah 1 : 4 472.15 M2
3 Plesteran 1 : 2 tebal 15 cm 99.20 M2
4 Plesteran 1 : 4 tebal 15 cm 944.31 M2
5 Plesteran beton 1 : 2 1,324.28 M2
6 Benangan sudut 351.20 M'
B LANTAI 2
1 Pasangan bata merah 1 : 4 154.41 M2
2 Plesteran 1 : 4 308.82 M2
3 Plesteran Beton 1 : 2 9.60 M2
4 Benangan sudut M'

C LANTAI 3
1 Pasangan bata merah 1 : 4 958.61 M2
2 Plesteran 1 : 4 1,917.22 M2
3 Plesteran Beton 1 : 2 114.00 M2
3 Benangan sudut 196.00 M'
D DAK ATAP (LANTAI 4)
1 Pasangan bata merah 1 : 4 240.09 M2
2 Plesteran 1 : 4 480.17 M2
3 Plesteranbeton 1:2 776.75 M2
4 Benangan sudut 550.00 M'

VI PEKERJAAN KERAMIK
A LANTAI 1
1 Keramik lantai 40/40 229.17 M2
2 Keramik lantai KM/WC 20/20 13.50 M2
3 Keramik dinding KM/WC 20/25 16.67 M2
4 Plint dinding Keramik 10/20 24.00 M'
5 Pasang Batu alam motif garis 129.60 m2

B LANTAI 2
1 Keramik lantai 40/40 75.49 M2
C LANTAI 3
1 Keramik lantai 40/40 540.22 M2
2 Keramik lantai 20/20 27.86 M2
3 Keramik dinding KM/WC 20/25 88.50 M2
4 Plint dinding Keramik 10/20 59.00 M'
5 Pasang Batu alam motif garis 84.60 m2

D LANTAI 4
1 Keramik lantai 40/40 88.07 M2
2 Pasang Batu alam motif garis 25.60 m2

VII PEKERJAAN KUSEN PINTU DAN JENDELA & RAILLING


A LANTAI 1
1 Kusen Pintu, Jendela Dan Bouvenlist Alumunium + sealent 0.00 M1
2 Pekerjaan Pintu
a Pintu Type PJ1 Jumlah 1 Buah
Daun Pintu Double Kaca Ryben t. 5 mm, Rangka Aluminium Uk.0.85x2.30 2.00 Bh
Daun Jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.85x1.46 2.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.85x0.54 2.00 Bh
Kaca Mati Ryben t. 5 mm 0.00 M2
b Pintu Type P1 Jumlah 2 Buah
Daun Pintu Double Teakwood + finil , Rangka Aluminium Uk.0.77x2.10 4.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.75x0.54 4.00 Bh
c Pintu Type P2 Jumlah 2 Buah
Daun Pintu Double Teakwood+ finil , Rangka Aluminium Uk.0.80x2.10 2.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.80x0.54 2.00 Bh
d Pintu Type P3 Jumlah 2 Buah
Daun Pintu Double Teakwood + Finil , Rangka Aluminium )Uk.0.70x2.10 2.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.70x0.54 2.00 Bh
3 Pekerjaan Jendela
a Jendela Type J1 Jumlah 2 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x1.40 4.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.54 4.00 Bh
Kaca Mati Ryben t. 5 mm 0.00 M2
b Kaca Mati Ryben t 5 mm Jendela Sudut 0.00 M2
4 Pekerjaan Bovenlist
a Bouvenlist 1 ( BV1 ), jumlah 2 buah
Daun Bouvenlist kaca Ryben 5 mm, rangka Aluminium Uk.0.50x0.50 4.00 Bh
b Bouvenlist 2 ( BV2), jumlah 4 buah
Daun Bouvenlist kaca Ryben 5 mm, rangka Aluminium Uk.0.69x0.69 12.00 Bh
5 Kunci Pintu Ganda Utama + Kelengkapannya Terpasang 1.00 Bh
6 Kunci Pintu Ganda+ Kelengkapannya Terpasang 2.00 Bh
7 Kunci Pintu Tunggal + Kelengkapan Terpasang 4.00 Bh
8 Engsel Pintu 4 " 30.00 Bh
9 Engsel Jendela 3" 12.00 Bh
###Grandel Jendela /Spring Knipe 6.00 Bh
###Hak Angin Jendela 12.00 Bh
###Engsel Ventilasi 3 " 60.00 Bh
###Hak Angin Ventilasi 60.00 Bh
###Door Holder 2.00 Bh
###Door Closer 8.00 Bh
###Door Stop 4.00 Bh
###Railling tangga utama dari pipa Kotak 12.02 m2
###Railling tangga darurat dari pipa Kotak 5.47 m2

B LANTAI 2
1 Kusen Pintu, Jendela Dan Bouvenlist Alumunium + sealent 0.00 M1
2 Pekerjaan Pintu
a Pintu Type P2 Jumlah 2 Buah
Daun Pintu Double Teakwood+ finil , Rangka Aluminium Uk.0.80x2.10 2.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.80x0.54 2.00 Bh
3 Pekerjaan Jendela
a Jendela Type J8 Jumlah 2 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x1.40 4.00 Bh
b Kaca Mati Ryben t 5 mm jendela sudut 0.00 m2
4 Kunci Pintu Tunggal + Kelengkapan Terpasang 2.00 Bh
5 Engsel Pintu 4 " 6.00 Bh
6 Engsel Jendela 3" 8.00 Bh
7 Grandel Jendela /Spring Knipe 4.00 Bh
8 Hak Angin Jendela 8.00 Bh
9 Engsel Ventilasi 3 " 8.00 Bh
###Hak Angin Ventilasi 8.00 Bh
###Door Closer 2.00 Bh
###Railling tangga utama dari pipa Kotak 12.70 m2
###Railling tangga darurat dari pipa Kotak 7.87 m2
###Railling pagar Void dari pipa kotak 28.73 m2

C LANTAI 3
1 Kusen Pintu, Jendela Dan Bouvenlist Alumunium + sealent 0.00 M1
2 Pekerjaan Pintu
a Pintu Type P1 Jumlah 6 Buah
Daun Pintu Double Teakwood + finil , Rangka Aluminium Uk.0.77x2.10 12.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.75x0.54 12.00 Bh
b Pintu Type P2 Jumlah 1 Buah
Daun Pintu Double Teakwood+ finil , Rangka Aluminium Uk.0.80x2.10 1.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.80x0.54 1.00 Bh
c Pintu Type P3 Jumlah 6 Buah
Daun Pintu Double Teakwood + Finil , Rangka Aluminium )Uk.0.70x2.10 6.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.70x0.54 6.00 Bh
3 Pekerjaan Jendela
a Jendela Type J2 Jumlah 8 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.65 16.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium ( lengkap )Uk.0.65x0.54 16.00 Bh
Kaca Mati Ryben t. 5 mm 0.00 m2
b Jendela Type J3 Jumlah 12 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.65 12.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.54 12.00 Bh
c Jendela Type J4 Jumlah 1 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x1.40 2.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.54 2.00 Bh
d Jendela Type J5 Jumlah 48 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.6x1.70 48.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.69 48.00 Bh
e Jendela Type J7 Jumlah 6 Buah
Kaca Mati Ryben 5mm 0.00 m2
f Kaca Mati Ryben t 5 mm Jendela sudut 0.00 m2
4 Pekerjaan Bovenlist
a Bouvenlist 1 ( BV1 ), jumlah 7 buah
Daun Bouvenlist kaca Ryben 5 mm, rangka Aluminium Uk.0.50x0.50 14.00 Bh
5 Kunci Pintu Ganda+ Kelengkapannya Terpasang 6.00 Bh
6 Kunci Pintu Tunggal + Kelengkapan Terpasang 7.00 Bh
7 Engsel Pintu 4 " 57.00 Bh
8 Engsel Jendela 3" 156.00 Bh
9 Grandel Jendela /Spring Knipe 78.00 Bh
###Hak Angin Jendela 156.00 Bh
###Engsel Ventilasi 3 " 222.00 Bh
###Hak Angin Ventilasi 111.00 Bh
###Door Closer 13.00 Bh
###Door Stop 7.00 Bh
###Railling tangga utama dari pipa Kotak 16.32 m2
###Railling pagar Void dari pipa kotak 9.12 m2
###Pasang pipa seluncur stainlist steel 11.10 M'

D LANTAI 4
1 Kusen Pintu, Jendela Dan Bouvenlist Alumunium + sealent 107.34 M1
2 Pekerjaan Pintu
a Pintu Type P1 Jumlah 1 Buah
Daun Pintu Double Teakwood + finil , Rangka Aluminium Uk.0.77x2.10 2.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.75x0.54 2.00 Bh
3 Pekerjaan Jendela
a Jendela Type J1 Jumlah 2 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x1.40 4.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.54 4.00 Bh
Kaca Mati Ryben t. 5 mm 2.13 M2
b Jendela Type J6 Jumlah 2 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x1.40 2.00 Bh
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.54 2.00 Bh
4 Pekerjaan Bovenlist
a Bouvenlist 3 ( BV3), jumlah 4 buah
Kaca Mati Ryben 5 mm 11.43 M2

Jumlah VII (A+B+C+D)


VIII PEKERJAAN PLAFOND
A PLAFOND LANTAI 1
1 Pasang rangka dan plafond gypsum 9 mm 127.50 M2
2 Pasang plafond gypsum 9 mm 127.50
3 Pasang list plafond gypsum 100.00 m'

B PLAFOND LANTAI 2
1 Pasang rangka dan plafond gypsum 9 mm 60.00 M2
2 Pasang plafond gypsum 9 mm 60.00
3 Pasang list plafond gypsum 56.00 M'

C PLAFOND LANTAI 3
1 Pasang rangka dan plafond gypsum 9 mm 609.21 M2
2 Pasang plafond gypsum 9 mm 609.21
3 Pasang list plafond gypsum 430.88 M'

D PLAFOND DAK ATAP (LANTAI 4)


1 Pasang rangka dan plafond gypsum 9 mm 75.00 M2
2 Pasang plafond gypsum 9 mm 75.00
3 Pasang list plafond gypsum 58.00 M'

Jumlah VIII (A+B+C+D)


IX PEKERJAAN ATAP & SUNSCREEN
1 Rangka atap kantilever baja INP (5x 8) m2 (lengkap) 1.00 Unit
2 Atap kantilever polycarbonate 40.00 M2
3 Grill besi siku + plat strip 5 cm 41.40 M2
4 Kuda kuda kayu lembasung 6/12 0.48 M3
5 Gording kayu lembasung 5/10 0.52 M3
6 Rangka atap kasau/reng kayu lembasung 65.00 M2
7 Penutup atap genteng metal 65.00 M2
8 Bubungan atap genteng metal 16.00 M1
Jumlah IX
X PEKERJAAN SANITAIR & PLUMBING
1 Biaya penyambungan air PDAM 1.00 Paket
2 Pasang jaringan air bersih dalam gedung
- Pasang Pipa 1/2 " 31.00 m
- Pasang Pipa 3/4 " 84.00 m
3 Pasang jaringan air kotor
- Pasang Pipa 4 " 67.00 m
- Pasang Pipa 2 " 66.80 m
4 Pasang pipa pvc Ǿ 4" untuk air hujan 234.00 M'
5 Pasang closed duduk porselin (lengkap) 8.00 Unit
6 Hand shower (lengkap dengan kran air) 8.00 Bh
7 Pasang floor drain Ø 2" 8.00 Bh
8 Kran air 1/2" 10.00 Bh
9 Wastafel Porselin (lengkap) 1.00 Unit
###Bak cuci alumunium 2 lubang 1.00 Bh
###Pembuatan septictank + sumur resapan 2.00 Unit
###Pompa air listrik sanyo 1.00 Unit
###Waterproofing
- Lantai KM/WC 53.75 M2
- Atap dak beton 618.48 M2
Jumlah X
XI PEKERJAAN INSTALASI LISTRIK & LAMPU
1 Penyambungan baru listrik 1.00 Bh
2 Pasang jaringan titik lampu LT. 1 27.00 Titik
- Pasang lampu down light SL 18 watt 24.00 Titik
- Pasang lampu SL 14 watt 3.00 Titik
- Pasang Stop Kontak & Instalasi 5.00 Titik
- Saklar tunggal 5.00 Titik
- Saklar ganda 6.00 Titik
- Penghisap ruangan 3.00 Titik
3 Pasang jaringan titik lampu LT. 2 47.00 Titik
- Pasang lampu down light SL 18 watt 11.00 Titik
- Pasang lampu SL 14 watt 3.00 Titik
- Pasang lampu spotlight halogen 100 watt 33.00 Titik
- Pasang Stop Kontak & Instalasi 4.00 Titik
- Saklar tunggal 3.00 Titik
- Saklar ganda 12.00 Titik
- Penghisap ruangan 2.00 Titik
4 Pasang jaringan titik lampu LT. 3 67.00 Titik
- Pasang lampu down light SL 18 watt 46.00 Titik
- Pasang lampu SL 14 watt 7.00 Titik
- Pasang lampu spotlight halogen 100 watt 2.00 Titik
- Pasang Lampu TL 2 x 40 watt 8.00 Titik
- Pasang Lampu TL 1 x 40 watt 4.00 Titik
- Pasang Stop Kontak & Instalasi 34.00 Titik
- Saklar tunggal 5.00 Titik
- Saklar ganda 28.00 Titik
- Penghisap ruangan 16.00 Titik

NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
5 Pasang jaringan titik lampu dak atap 7.00 Titik
- Pasang lampu spotlight halogen 100 watt 7.00 Titik
- Saklar ganda 3.00 Titik
6 Pasang panel box 10 Amphere 3.00 Titik
7 Pasang Instalasi penangkal petir 1.00 Titik
Jumlah XI
XII PEKERJAAN CAT
A LANTAI 1
1 Cat dinding dalam (cat air) 1,020.53 M2
2 Cat dinding luar (cat wheatersield)
3 Cat plafond & beton expose (cat air) 212.28 M2
4 Cat kilap 11.27 M2

B LANTAI 2
1 Cat dinding (cat air) 1,427.79 M2
2 Cat dinding luar (cat wheatersield)
3 Cat plafond & beton expose (cat air) 801.08 M2
4 Cat kilap 3.70 M2

C LANTAI 3
1 Cat dinding (cat air) 1,497.84 M2
2
3 Cat plafond & beton expose (cat air) 714.38 M2
4 Cat kilap 59.02 M2

D DAK ATAP
1 Cat dinding (cat air) 551.33 M2
2
3 Cat plafond & beton expose (cat air) 714.38 M2
4 Cat kilap 0.88 M2

Jumlah XII (A+B+C+D)


XIII PEKERJAAN PLUMBING TANDON AIR ATAS
A Pengadaan Dan Pemasangan Pipa & Aksesoris
1 Pipa PVC Ǿ 1,5" 92.00 M'
2 Stop Kran Ø 1,5" 4.00 Bh
3 Elbow Ø 1,5" 4.00 Bh
4 TEE Ø 1,5" 4.00 Bh
5 Aksesoris pipa PVC Ǿ 1.5" 1.00 Pkt
6 Stop Kran / Hidran 24.00 Bh
7 Profil Tank 2200 lt 4.00 Bh

NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
B Pekerjaan lain - lain
1 Plat persegi 5cm gantungan pipa 1.00 Ls
2 Clam pipa 1.00 Ls
3 Pengecatan pipa dan Aksesoris 1.00 Ls

Jumlah XIII (A+B)


XIV PEKERJAAN BAK AIR BAWAH 3MX10M X2
A Pekerjaan Tanah dan Pancang
1 Galian tanah 162.00 M3
2 Urugan bekas galian 7.50 M3
3 Urug pasir bawah plat coor 3.00 M3
4 Pancang ulin 10/10 - 2m 44.00 Titik
5 Galian tanah/bongkar beton untuk pipa tandon air 200.00 M3
B Pekerjaan Beton
1 Lantai Kerja 5cm 1.50 M3
2 Beton lantai tebal 15cm
- Coor beton 1:2:3 4.50 M3
- Besi beton polos Ǿ12 358.45 kg
3 Beton dinding tebal 15 cm
- Coor beton 1:2:3 21.06 M3
- Pasang begisting 140.40 M2
- Pasang begisting 140.40 M2
- Besi beton polos Ǿ12 1,855.38 Kg
4 Beton balok 15/30
- Coor beton 1:2:3 0.41 M3
- Pasang begisting 26.00 M2
- Pasang begisting 26.00 M2
- Besi beton polos Ǿ12 (Tulangan) 80.25 Kg
- Besi beton polos Ǿ10(begel) 39.22 Kg
5 Beton daak tebal 15 cm
- Coor beton 1:2:3 4.50 M3
- Pasang begisting 30.00 M2
- Pasang begisting 30.00 M2
- Besi beton polos (Tulangan) 358.45 Kg

C Pekerjaan Plesteran
1 Plester & Acian lantai 1:2 30.00 M2
2 Plester & Acian dinding 1:2 46.8 M2
3 Plester & Acian lantai atas 1:2 60.00 M2

PengadaanDPipa & Aksesoris


1 Pipa GIP Ǿ 2" 200.00 M'
2 Gate Valve Ǿ 2" 2.00 Bh
3 Flange Socket Ǿ 2" 2.00 Bh
4 Flange Spigot Ǿ 2" 2.00 Bh
6 Flange las Ǿ 2" 7.00 Bh
7 Stop Kran / Hidran 1.00 Bh

Pemasangan
E Pipa & Aksesoris
1 Pipa GIP Ǿ 2" 200.00 M'
2 Gate Valve Ǿ 2" 2.00 Bh
3 Flange Socket Ǿ 2" 2.00 Bh
4 Flange Spigot Ǿ 2" 2.00 Bh
5 Flange las Ǿ 2" 7.00 Bh
6 Stop Kran / Hidran 1.00 Bh
7 Pengetesan pipa 200.00 M'

Pekerjaan
F lain - lain
1 Plat penutup 6mm 1.00 Bh
2 Tangga reservoar 1.00 Bh

Jumlah XIV (A+B+C+D+E+F)


Jumlah XIV x 2 Buah Reservoar

XV PEKERJAAN PAGAR
A Pekerjaan tanah dan pancang
1 Galian tanah pondasi 136.00 m3
2 Urugan bekas galian 27.20 m3
3 Urug pasir bawah pondasi 14.88 m3
4 Pancang ulin 10/10 - 2m 142.00 ttk
5 Sunduk kayu ulin 5/10 - 50cm 1.06 m3
6 Kalang kayu ulin 5/20 - 4m 1.06 m3

B Pekerjaan pasangan & beton


1 Pas. Anstampang 20cm 35.2 m3
2 Pasangan batu gunung 1:2 154.00 m3
3 Beton sloof 15/30
- Coor beton 1:2:3 9.56 m3
- Pasang begesting 127.50 m2
- Bongkar begesting 127.50 m2
- Besi beton polos Ǿ 10 786.68 kg
- Besi begel Ǿ 8 503.63 kg
4 Beton kolom 20/20
- Coor beton 1:2:3 5.80 m3
- Pasang begesting 116.00 m2
- Bongkar begesting 116.00 m2
- Besi beton polos Ǿ 10 536.79 kg
- Besi begel Ǿ 8 229.10 kg
5 Beton ring 10/20
- Coor beton 1:2:3 4.25 m3
- Pasang begesting 85.00 m2
- Bongkar begesting 85.00 m2
- Besi beton polos Ǿ 10 524.45 kg
- Besi begel Ǿ 8 251.81 kg
6 Pasangan batu bata 1:4 42.50 m3
7 Plesteran & acian 1:4 1,062.50 m2
8 Pek. pengecatan , 1xplamir 1xcat dasar, 2xcat penutup 1,062.50 m2

Jumlah XV (A+B)

NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
XVI PEKERJAAN LANSDCAPE
A Perkerasan jalan dan halaman coor beton bertulang
1 Urugan tanah peningian peil t=60cm 750.00 M3
2 Urug pasir 10 cm 227.22 M3
3 Beton coor tebal 15 cm
- Coor beton 1:2:3 225.00 M3
- Pasang begesting 150.00 M2
- Bongkar begesting 150.00 M2
- Besi beton polos Ǿ 12 16,050.00 Kg
4 Plester finishing koral sikat 1,500.00 M2

B Pekerjaan Media taman


1 Media taman 1 (depan)
- Galian tanah 3.20 M3
- Pasangan batu bata 1:4 0.30 M3
- Plester dan acian 1:4 24.00 M2
- Benangan sudut 35.00 M'
- Pek. pengecatan , 1xplamir 1xcat dasar, 2xcat penutup 75.00 M2
2 Pengadaan bunga dan penanaman
- Pupuk kadang 20.00 Zak
- Tanaman glodok 2.00 Btg
- Palem kipas 4.00 Btg
- Rumput gajah 25.00 M2
3 Media taman 2 (Samping)
- Galian tanah 6.00 M3
- Pasangan batu bata 1:4 1.50 M3
- Plester dan acian 1:4 150.00 M2
- Benangan sudut 70.00 M'
- Pek. pengecatan , 1xplamir 1xcat dasar, 2xcat penutup 140.00 M2
4 Pengadaan bunga dan penanaman
- Pupuk kadang 112.00 Zak
- Tanaman glodok 28.00 Btg
- Palem kipas 2.00 Btg
- Rumput gajah 30.00 M2
3 Media taman 3 (Belakang)
- Galian tanah 3.08 M3
- Pasangan batu bata 1:4 3.85 M3
- Plester dan acian 1:4 77.00 M2
- Benangan sudut 124.00 M'
- Pek. pengecatan , 1xplamir 1xcat dasar, 2xcat penutup 96.25 M2
4 Pengadaan bunga dan penanaman
- Pupuk kadang 170.00 Zak
- Palem kipas 12.00 Btg
- Bunga dadap merah 12.00 Btg
- Rumput gajah 360.00 M2

Jumlah XVI (A+B)


A N A L I S A HARGA SATUAN PEKERJAAN
PEKERJAAN PINTU DAN JENDELA
(SNI)

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR


PEKERJAAN : PEMBANGUNAN MARKAS PEMADAM KEBAKARAN
LOKASI : TANJUNG SELOR KABUPATEN BULUNGAN

NO / TOTAL PRICE
D E S C R I P T I O N UNIT
KODE Harga Satuan Upah Bahan/Alat JUMLAH
1 2 3 5 6 7

A PEKERJAAN PINTU JENDELA BANGUNAN PMK


1 Pintu Type PJ1 Per Buah
Daun Pintu
3.9100 m2 Daun pintu panel 1,076,392.20 4,208,693.50
2.8000 m2 Kaca ryben 5 mm 281,485.00 788,158.00
1.0000 set Lockset (Lokcset, Cylinder, Handle) Pintu 291,370.00 291,370.00
6.0000 bh Hinges 56,905.00 341,430.00
2.0000 bh door closer 203,850.00 407,700.00
2.0000 bh door holder 396,350.00 792,700.00
6,830,051.50 6,830,051.50
Daun Jendela
2.4800 m2 Daun jendela 841,175.33 2,086,114.81
1.8800 m2 Kaca ryben 5 mm 281,485.00 529,191.80
2.0000 bh handel jendela 25,000.00 50,000.00
2.0000 bh grandel 43,040.00 86,080.00
2.0000 bh whindak 39,705.00 79,410.00
4.0000 bh engsel 35,270.00 141,080.00
2,971,876.61 2,971,876.61
Kaca Mati Ryben 5mm
3.0200 m2 kaca ryben 5 mm 281,485.00 850,084.70
850,084.70 850,084.70

Total Harga Satuan PJ 1 10,652,012.81

2 Pintu Type P1 / bh
3.3600 m2 Daun pintu panel 1,076,392.20 3,616,677.79
2.2200 m2 Double teakwood + vinil 250,000.00 555,000.00
0.7800 m2 Kaca Mati Ryben 5 mm 281,485.00 219,558.30
1.0000 set Lockset (Lokcset, Cylinder, Handle) Pintu 291,370.00 291,370.00
6.0000 bh Hinges 56,905.00 341,430.00
2.0000 bh door closer 203,850.00 407,700.00
5,431,736.09 5,431,736.09

3 Pintu Type P2 / bh
1.6800 m2 Daun pintu panel 1,076,392.20 1,808,338.90
1.1100 m2 Double teakwood + vinil 250,000.00 277,500.00
0.4000 m2 Kaca Mati Ryben 5 mm 281,485.00
1.0000 set Lockset (Lokcset, Cylinder, Handle) Pintu 291,370.00 291,370.00
3.0000 bh Hinges 56,905.00 170,715.00
1.0000 bh door closer 203,850.00 203,850.00
2,751,773.90 2,751,773.90

ANAL kusen 318679864.xls Page_211_Of_214


A N A L I S A HARGA SATUAN PEKERJAAN
PEKERJAAN PINTU DAN JENDELA
(SNI)

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR


PEKERJAAN : PEMBANGUNAN MARKAS PEMADAM KEBAKARAN
LOKASI : TANJUNG SELOR KABUPATEN BULUNGAN

NO / TOTAL PRICE
D E S C R I P T I O N UNIT
KODE Harga Satuan Upah Bahan/Alat JUMLAH
1 2 3 5 6 7

4 Pintu Type P3 / bh
1.4700 m2 Daun pintu panel 1,076,392.20 1,582,296.53
1.1100 m2 Double teakwood + vinil 250,000.00 277,500.00
1.0000 set Lockset (Lokcset, Cylinder, Handle) Pintu 291,370.00 291,370.00
3.0000 bh Hinges 56,905.00 170,715.00
1.0000 bh door closer 203,850.00 203,850.00
2,525,731.53 2,525,731.53

5 Jendela Type J1 / bh
1.8200 m2 Daun jendela 841,175.33 1,530,939.09
3.0100 m2 Kaca ryben 5 mm 281,485.00 847,269.85
2.0000 bh handel jendela 25,000.00 50,000.00
2.0000 bh grandel 43,040.00 86,080.00
2.0000 bh whindak 39,705.00 79,410.00
4.0000 bh engsel 35,270.00 141,080.00
2,734,778.94 2,734,778.94

6 Jendela Type J2 / bh
0.8400 m2 Daun jendela 841,175.33 706,587.27
1.8100 m2 Kaca ryben 5 mm 281,485.00 509,487.85
2.0000 bh handel jendela 25,000.00 50,000.00
2.0000 bh grandel 43,040.00 86,080.00
2.0000 bh whindak 39,705.00 79,410.00
4.0000 bh engsel 35,270.00 141,080.00
1,572,645.12 1,572,645.12

7 Jendela Type J3/ bh


0.4200 m2 Daun jendela 841,175.33 353,293.64
0.5900 m2 Kaca ryben 5 mm 281,485.00 166,076.15
1.0000 bh handel jendela 25,000.00 25,000.00
1.0000 bh grandel 43,040.00 43,040.00
1.0000 bh whindak 39,705.00 39,705.00
2.0000 bh engsel 35,270.00 70,540.00
697,654.79 697,654.79

8 Jendela Type J4/ bh


1.8200 m2 Daun jendela 841,175.33 1,530,939.09
1.9400 m2 Kaca ryben 5 mm 281,485.00 546,080.90
2.0000 bh handel jendela 25,000.00 50,000.00

ANAL kusen 318679864.xls Page_212_Of_214


A N A L I S A HARGA SATUAN PEKERJAAN
PEKERJAAN PINTU DAN JENDELA
(SNI)

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR


PEKERJAAN : PEMBANGUNAN MARKAS PEMADAM KEBAKARAN
LOKASI : TANJUNG SELOR KABUPATEN BULUNGAN

NO / TOTAL PRICE
D E S C R I P T I O N UNIT
KODE Harga Satuan Upah Bahan/Alat JUMLAH
1 2 3 5 6 7

2.0000 bh grandel 43,040.00 86,080.00


2.0000 bh whindak 39,705.00 79,410.00
4.0000 bh engsel 35,270.00 141,080.00
2,433,589.99 2,433,589.99

9 Jendela Type J5/ bh


1.4900 m2 Daun jendela 841,175.33 1,253,351.23
1.0300 m2 Kaca ryben 5 mm 281,485.00 289,929.55
2.0000 bh handel jendela 25,000.00 50,000.00
2.0000 bh grandel 43,040.00 86,080.00
2.0000 bh whindak 39,705.00 79,410.00
4.0000 bh engsel 35,270.00 141,080.00
1,899,850.78 1,899,850.78

10 Jendela Type J6/ bh


0.9100 m2 Daun jendela 841,175.33 765,469.55
0.9700 m2 Kaca ryben 5 mm 281,485.00 273,040.45
1.0000 bh handel jendela 25,000.00 25,000.00
1.0000 bh grandel 43,040.00 43,040.00
1.0000 bh whindak 39,705.00 39,705.00
2.0000 bh engsel 35,270.00 70,540.00
1,216,795.00 1,216,795.00

11 Jendela Type J8/ bh


1.8200 m2 Daun jendela 841,175.33 1,530,939.09
1.2800 m2 Kaca ryben 5 mm 281,485.00 360,300.80
2.0000 bh handel jendela 25,000.00 50,000.00
2.0000 bh grandel 43,040.00 86,080.00
2.0000 bh whindak 39,705.00 79,410.00
4.0000 bh engsel 35,270.00 141,080.00
2,247,809.89 2,247,809.89

12 Bouvenlist Type BV1/ bh


0.5000 m2 Daun jendela 841,175.33 420,587.66
0.2200 m2 Kaca ryben 5 mm 281,485.00 61,926.70
2.0000 bh handel jendela 25,000.00 50,000.00
2.0000 bh grandel 43,040.00 86,080.00
2.0000 bh whindak 39,705.00 79,410.00
4.0000 bh engsel 35,270.00 141,080.00
839,084.36 839,084.36

13 Bouvenlist Type BV2/ bh

ANAL kusen 318679864.xls Page_213_Of_214


A N A L I S A HARGA SATUAN PEKERJAAN
PEKERJAAN PINTU DAN JENDELA
(SNI)

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR


PEKERJAAN : PEMBANGUNAN MARKAS PEMADAM KEBAKARAN
LOKASI : TANJUNG SELOR KABUPATEN BULUNGAN

NO / TOTAL PRICE
D E S C R I P T I O N UNIT
KODE Harga Satuan Upah Bahan/Alat JUMLAH
1 2 3 5 6 7

0.7500 m2 Daun jendela 841,175.33 630,881.49


0.3300 m2 Kaca ryben 5 mm 281,485.00 92,890.05
3.0000 bh handel jendela 25,000.00 75,000.00
3.0000 bh grandel 43,040.00 129,120.00
3.0000 bh whindak 39,705.00 119,115.00
6.0000 bh engsel 35,270.00 211,620.00
1,258,626.54 1,258,626.54

ANAL kusen 318679864.xls Page_214_Of_214