17.rab Plafond Dusun V Sukolilo
17.rab Plafond Dusun V Sukolilo
-1-
2.01.01.01.02.011. 1 m3 Pengurugan Tanah Untuk Peninggian Bangunan Berikut Pemadatan
A TENAGA
Pekerja OH 0.7500
Mandor OH 0.0750
JUMLAH TENAGA KE
B BAHAN
Tanah Urug m3 1.2000
JUMLAH HARGA BA
C PERALATAN
JUMLAH HARGA AL
D Jumlah (A+B+C)
E Margin & Overhead
F Harga Satuan Pekerjaan (D+E)
-2-
RGA SATUAN KONSTRUKSI
TAH KABUPATEN MADIUN
UN ANGGARAN 2019
-3-
Harga Satuan Jumlah Harga
(Rp) (Rp)
75,000.00 56,250.00
90,000.00 6,750.00
JUMLAH TENAGA KERJA 63,000.00
- -
JUMLAH HARGA BAHAN -
-4-
RENCANA SUMBER PENDAN
TAHUN 2018 : Madiun Kegiatan :
Kecamatan : Jiwan Pekerjaan :
Desa/Kelurahan : Sukolilo Lokasi :
Unit Pelaksana : 0 Volume :
I PEKERJAAN PERSIAPAN
1 Pekerjaan pembersihan lokasi dan pasang bouwplank 1.00 Ls -
2 Pembuatan administrasi 1.00 Ls -
II BAHAN
1 Hollow 2,4 152.63 m1 4,216.67
2 Hollow 4,4 138.00 m1 5,625.00
3 Calsiboard Uk. 244x122x6mm 20.88 Lembar 95,000.00
4 Sekrup 630.85 Buah 350.00
5 List gypsum 1 x 10 cm 32.45 m1 18,150.00
6 Tepung Gypsum 4.64 Kg 4,250.00
III UPAH
1 Tukang Kayu 29.41 O.H 90,000.00
2 Tukang Besi 30.68 O.H 90,000.00
3 Pekerja 16.56 O.H 70,000.00
TOTAL
DIBULATKAN
NA SUMBER PENDANAAN
Pembangunan Plafon Balai Dusun V
Pembangunan Plafond
Balai Dusun 5
29,2 M2'
- - - -
- - - -
643,603.74 643,603.74
776,252.50 776,252.50
1,983,163.00 1,983,163.00
220,797.50 220,797.50
588,876.75 588,876.75
19,698.75 19,698.75
2,647,125.00 2,647,125.00 - -
2,761,515.00 2,761,515.00 - -
1,159,200.00 1,159,200.00 - -
10,800,232.24 10,800,232.24 - -
10,800,000.00 10,800,000.00 - -
RENCANA ANGGARAN BIAYA
TAHUN 2018
( Rp )
I PEKERJAAN PERSIAPAN
1 Pekerjaan pembersihan lokasi dan pasang bouwplank 1.00 Ls -
2 Pembuatan administrasi 1.00 Ls -
SUB TOTAL I
II PEKERJAAN TANAH DAN PASANGAN
1 Pemasangan Rangka Plafond Hollow Galvalume 0.6 x 63.5 m2 121,704.52
2 Pekerjaan Langit-langit Calsiboard tebal 6mm 29.2 m2 55,995.50
3 List langit - langit gypsum 23.10 m1 31,317.00
SUB TOTAL II
I PEKERJAAN PERSIAPAN
1 BOP 1.00 Ls 709,025.02
TERBILANG : " LIMA PULUH SEMBILAN JUTA SEMBILAN RATUS TUJUH PULUH RIBU RUP
CANA ANGGARAN BIAYA
TAHUN 2018
JUMLAH
HARGA
( Rp )
-
-
-
7,731,279.77
1,636,272.50
723,422.70
10,090,974.98
709,025.02
709,025.02
10,800,000.00
10,800,000.00
II PEKERJAAN PONDASI
1 Pasangan batu kali belah 15/20 cm ( 1 SP : 6 PP ) #REF! m3
2 Pemasangan batu kali belah kosongan #REF! m3
3 Pemasangan rollag batu merah tebal 1 bata ( 1 SP : 5 PP ) #REF! m2
V PEKERJAAN LANTAI
2 Pek. Pasangan lantai keramik kasar 40x40 cm #REF! m2
4 Pek. Pasangan lantai keramik motif 20x20 cm #REF! m2
5 Pek. Pasangan dinding keramik 20x25 cm #REF! m2
X PEKERJAAN SANITAIR
1 Pek. Pemasangan kran air dia 3/4" atau 1/2" 3.00 Buah
2 Pek. Pemasangan Kloset duduk ex INA komplit 2.00 Unit
3 Pek. Pemasangan Kloset Jongkok Porselin 1.00 Unit
4 Pek. Pemasangan washtafel ex. INA komplit #REF! Unit
5 Pek. Pemasangan pipa PVC 1" type AW untuk air bersih #REF! m1
6 Pek. Pemasangan pipa PVC 3/4" type AW untuk air bersih #REF! m1
7 Pek. Pemasangan pipa PVC 3" type D untuk air kotor #REF! m1
8 Pek. Pemasangan pipa PVC 4" type D untuk air kotor #REF! m1
9 Pek. Pasang Bak Mandi PVC 3.00 Buah
10 Pek. Pemasangan floor drain #REF! Buah
11 Pek. Pipa Stainless 2" 1.20 m1
12 Pek. Septictank dan resapan #REF! Unit
XI PEKERJAAN PENGECATAN
1 Pek. Pengecatan tembok dalam baru 2 lapis ( interior stan #REF! m2
2 Pek. Pengecatan tembok dalam baru 2 lapis ( exterior stan #REF! m2
3 Pek. Pengecatan plafond #REF! m2
4 Pek. Pengecatan listplank #REF! m2
HARGA
TOTAL HARGA
SATUAN
Rp 9,900.00 Rp 1,942,889.85
Rp 139,128.50 Rp 2,059,101.73
Rp 60,500.00 #REF!
Rp 44,000.00 #REF!
Rp 119,030.32 #REF!
Rp 201,278.00 #REF!
Rp 46,860.00 #REF!
#REF!
Rp 759,239.25 #REF!
Rp 376,835.58 #REF!
Rp 251,281.25 #REF!
#REF!
### #REF!
Rp 13,253.90 #REF!
Rp 13,253.90 #REF!
### #REF!
Rp 13,253.90 #REF!
Rp 13,253.90 #REF!
Rp 168,509.14 #REF!
### #REF!
Rp 13,253.90 #REF!
Rp 13,253.90 #REF!
Rp 243,395.90 #REF!
### #REF!
Rp 13,253.90 #REF!
Rp 13,253.90 #REF!
Rp 138,079.43 #REF!
### #REF!
Rp 13,253.90 #REF!
Rp 13,253.90 #REF!
Rp 247,850.90 #REF!
### #REF!
Rp 13,253.90 #REF!
Rp 13,253.90 #REF!
Rp 247,850.90 #REF!
### #REF!
Rp 13,253.90 #REF!
Rp 13,253.90 #REF!
Rp 138,079.43 #REF!
### #REF!
Rp 13,253.90 #REF!
Rp 289,155.90 #REF!
### #REF!
Rp 13,253.90 #REF!
Rp 289,155.90 #REF!
### #REF!
Rp 13,253.90 #REF!
Rp 289,155.90 #REF!
Rp 878,834.09 #REF!
#REF!
Rp 126,250.99 #REF!
Rp 121,250.80 #REF!
Rp 56,947.66 #REF!
Rp 382,961.56 #REF!
Rp 424,404.06 #REF!
Rp 580,700.00 #REF!
Rp 10,472.69 #REF!
Rp 31,779.69 #REF!
#REF!
Rp 146,716.63 #REF!
Rp 140,955.38 #REF!
Rp 147,557.85 #REF!
#REF!
Rp 218,726.75 #REF!
#REF!
Rp 151,316.00 #REF!
Rp 156,222.00 #REF!
#REF!
Rp 121,704.52 #REF!
Rp 55,995.50 #REF!
Rp 122,725.19 #REF!
Rp 48,295.50 #REF!
#REF!
Rp 154,941.05 #REF!
### #REF!
Rp 700,000.00 #REF!
Rp 350,000.00 #REF!
Rp 170,717.25 #REF!
#REF!
Rp 241,120.00 Rp 723,360.00
### Rp 4,261,290.00
Rp 444,097.50 Rp 444,097.50
Rp 727,202.30 #REF!
Rp 29,217.65 #REF!
Rp 23,049.81 #REF!
Rp 49,852.00 #REF!
Rp 64,317.00 #REF!
Rp 350,000.00 Rp 1,050,000.00
Rp 78,265.00 #REF!
Rp 153,892.25 Rp 184,670.70
### #REF!
#REF!
Rp 22,418.44 #REF!
Rp 53,552.99 #REF!
Rp 22,418.44 #REF!
Rp 37,574.90 #REF!
#REF!
Rp 254,226.50 #REF!
Rp 428,946.10 #REF!
Rp 41,400.00 #REF!
Rp 82,500.00 Rp 165,000.00
Rp 518,596.10 #REF!
#REF!
Rp 200,000.00 Rp 1,200,000.00
Rp 150,000.00 Rp 2,550,000.00
### Rp 1,000,000.00
Rp 4,750,000.00
#REF!
BAC
UNIT
SA
JUMLAH
JUMLAH
JUMLAH
BACK UP VOLUME
UNIT BANGUNAN
SALURAN AIR
Analis hitungan
GRID Cad area Tinggi (h) Lebar (b) Tebal (t) Panjang (l) Jumlah (n) Luas
d e f g h i j k
6.20 9.25
6.20 9.25
57.35
57.35 m2
57.35
57.35 m2
30.90
30.90 m1
PEKERJAAN : #REF!
LOKASI : #REF!
### : #REF!
### : 2019
BULAN 1
Bobot
NO ITEM PELAKSANAAN
%
Minggu Minggu
1 2
4 #REF! #REF!
5 #REF! #REF!
6 #REF! #REF!
7 #REF! #REF!
8 #REF! #REF!
9 #REF! #REF!
10 #REF! #REF!
11 #REF! #REF!
12 #REF! #REF!
13 #REF! #REF!
14 #REF! #REF!
1.350 #REF!
4.950 #REF!
#REF! #REF!
#REF!
#REF! #REF!
###
#REF! #REF!
50
3.460 #REF!
2.950 #REF!
#REF! #REF!
#REF!
#REF! #REF!
Dibuat Oleh :
PT/CV..........................................
.................................................
Direktur/Direktris
DAFTAR REKAPITULASI
HARGA SATUAN POKOK KEGIATAN TAHUN 2019
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN MADIUN
II BIDANG PENGAIRAN
A PEKERJAAN PERSIAPAN DAN TANAH
NO URAIAN KEGIATAN SATUAN
B. PEKERJAAN PASANGAN
1 Pasangan Batu Bata ( 1 Pc : 4 PP ) Bangunan Basah ( Manual ) m3
2 Pasangan Batu Kali ( 1 Pc : 4 PP ) Bangunan Basah ( Manual ) m3
3 Pasangan Batu Kali ( 1 Pc : 4 PP ) Bangunan Basah ( Menggunakan Molen ) m3
Pasangan Batu Kali bekas bongkaran ( 1 Pc : 4 PP ) Bangunan Basah ( Menggunakan
4 m3
Molen )
5 Bongkar Pasangan batu dan Pembersihan Batu m3
6 Pasangan Batu Merah ( 1 Pc : 6 PP ) ( Menggunakan Molen ) m3
7 Pasangan Batu Merah ( 1 Pc : 6 PP ) ( Manual ) m3
8 Pasangan Batu Merah ( 1 Pc : 5 PP ) ( Menggunakan Molen ) m3
9 Pasangan Batu Merah ( 1 Pc : 5 PP ) ( Manual ) m3
10 Pemasangan Batu Merah tebal 1/2bata (1 Pc : 6 Ps) m2
11 Plesteran 1 Pc : 6 Ps tebal 15 mm m2
12 Siaran ( 1 Pc : 2 PP ) m2
13 Siaran ( 1 Pc : 3 PP ) m2
14 Plesteran Tebal 1.5 Cm ( Campuran 1 Pc : 3 PP ) m2
15 Plesteran Tebal 1.5 Cm ( Campuran 1 Pc : 4 PP ) m2
16 Acian m2
17 Pasangan Batu Kosong m3
Bronjong Bentuk II, Type G bronjong kawat Ukuran L=6,0 m x B = 2,0 m x T = 0,17 m.
37 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,0 mm, kawat sisi m3
diameter 3.4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 60 x 80 mm
Bronjong Bentuk II, Type G bronjong kawat Ukuran L=6,0 m x B = 2,0 m x T = 0,17 m.
38 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,7 mm, kawat sisi m3
diameter 4.0 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 80 x 100 mm
Bronjong Bentuk II, Type H bronjong kawat Ukuran L=6,0 m x B = 2,0 m x T = 0,23 m.
39 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,0 mm, kawat sisi m3
diameter 3.4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 60 x 80 mm
Bronjong Bentuk II, Type H bronjong kawat Ukuran L=6,0 m x B = 2,0 m x T = 0,23 m.
40 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,7 mm, kawat sisi m3
diameter 4.0 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 80 x 100 mm
Bronjong Bentuk II, Type I bronjong kawat Ukuran L=6,0 m x B = 2,0 m x T = 0,3 m.
41 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,0 mm, kawat sisi m3
diameter 3.4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 60 x 80 mm
Bronjong Bentuk II, Type I bronjong kawat Ukuran L=6,0 m x B = 2,0 m x T = 0,3 m.
42 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,7 mm, kawat sisi m3
diameter 4.0 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 80 x 100 mm
43 Pasang Bronjong Pabrikasi Bentuk II. ( tenaga Kerja untuk 1 m3 batu bronjong) m3
44 Pasang cerucuk bambu diameter 8 - 10 cm m1
45 Pasangan Batu Muka m2
46 Pembabatan Rumput Manual m2
NO URAIAN KEGIATAN SATUAN
C. PEKERJAAN BETON
1 Beton Tumbuk untuk lantai kerja ( K-40 s/d K-60 ) Setara 1 Pc : 3 Pb : 5 Kr m3
2 Beton Tumbuk untuk lantai kerja ( K-80 s/d K-100 ) Setara 1 Pc : 2 Pb : 3 Kr m3
3 Beton Tumbuk untuk lantai kerja ( K-100 ) Setara 1 Pc : 2 Pb : 3 Kr m3
4 Beton K-100 ( Manual ) m3
5 Beton K-100 ( Menggunakan molen ) m3
6 Beton K-125 ( Manual ) m3
7 Beton K-125 ( Menggunakan molen ) m3
8 Beton K-150 ( Manual ) m3
9 Beton K-150 ( Menggunakan molen ) m3
10 Beton K-175 ( Manual ) m3
11 Beton K-175 ( Menggunakan molen ) m3
12 Beton K-200 ( Manual ) m3
13 Beton K-200 ( Menggunakan molen ) m3
14 Beton K-225 ( Manual ) m3
15 Beton K-225 ( Menggunakan molen ) m3
16 Beton K-250 ( Manual ) m3
17 Beton K-250 ( Menggunakan molen ) m3
18 Beton K-275 ( Manual ) m3
19 Beton K-275 ( Menggunakan molen ) m3
20 Beton K-300 ( Manual ) m3
21 Beton K-300 ( Menggunakan molen ) m3
22 Beton K-325 ( Manual ) m3
23 Beton K-325 ( Menggunakan molen ) m3
24 Beton K-350 ( Manual ) m3
25 Beton K-350 ( Menggunakan molen ) m3
26 Beton Menggunakan Ready Mixed 175 dan Menggunakan Pompa Beton m3
Mengangkut / Menaikan Campuran Beton ≥ 5m, bton dicor dengan tapak berjarak <
27 m3
25 m dengan beda tinggi < 1 m
NO URAIAN KEGIATAN SATUAN
D. PEKERJAAN PEMBORAN
1 Pengoperasian Pompa Air Diesel untuk pengeringan Jam
2 Pengeboran diameter 8 3/4" m
3 Reaming diameter 8 3/4" - 12" m
4 Reaming diameter 8 3/4" - 14 3/4" m
5 Pengadaan dan Pemasangan Pipa Sumur PVC 6" m
6 Pengadaan dan Pemasangan Pipa Sumur PVC 6" ( screen) m
7 Pengadaan dan Pemasangan Pipa Sumur PVC 8" m
8 Pengadaan dan Pemasangan Pipa Sumur PVC 8" ( screen) m
9 Pengadaan dan Pemasangan gravel pack m3
10 Pencucian Sumur Jam
11 Uji Pemompaan Jam
12 Pengadaan dan Pemasangan Pipa GI Diameter 3" m1
13 Pengadaan dan Pemasangan Pipa GI Diameter 4" m1
14 Pengadaan dan Pemasangan Pipa PVC Klas AW Diameter 1" m1
15 Pengadaan dan Pemasangan Pipa PVC Klas AW Diameter 1 1/2" m1
16 Pengadaan dan Pemasangan Pipa PVC Klas AW Diameter 2" m1
17 Pengadaan dan Pemasangan Pipa PVC Klas AW Diameter 3" m1
18 Pengadaan dan Pemasangan Pipa PVC Klas AW Diameter 4" m1
19 Pengadaan dan Pemasangan Pipa PVC Klas AW Diameter 6" m1
20 Pengadaan dan Pemasangan Pipa PVC Klas D Diameter 1 1/2" m1
21 Pengadaan dan Pemasangan Pipa PVC Klas D Diameter 2" m1
22 Pengadaan dan Pemasangan Pipa PVC Klas D Diameter 3" m1
23 Pengadaan dan Pemasangan Pipa PVC Klas D Diameter 4" m1
NO URAIAN KEGIATAN SATUAN
19 Pegecoran Beton menggunakan Ready Mixed dan pompa beton dengan Mutu K 300 m3
20 Pegecoran Beton menggunakan Ready Mixed dan pompa beton dengan Mutu K 350 m3
21 Pegecoran Beton menggunakan Ready Mixed dan pompa beton dengan Mutu K 400 m3
22 Pegecoran Beton menggunakan Ready Mixed dan pompa beton dengan Mutu K 500 m3
23 Err:509 Err:509
39 Membuat Pondasi Beton Bertulang dg150 Kg Besi dan Bekisting m3
40 Membuat Beton Bertulang Strous dg150 Kg Besi m3
41 Membuat Beton Bertulang Sloof (200 Kg Besi + Bekisting) m3
42 Membuat Kolom Praktis Beton Bertulang Uk 11 x 11 cm m1
43 Membuat Ring Balok Beton Bertulang Uk.10 x 15 cm m1
44 Membuat Kolom Beton Bertulang dg 200 Kg Besi dan Bekisting m3
45 Membuat Balok Beton Bertulang dg 200 Kg Besi dan Bekisting m3
46 Membuat Plat Lantai Beton Bertulang dg 150 Kg Besi dan Bekisting m3
47 Membuat Tangga Beton Bertulang dg 200 Kg Besi dan Bekisting m3
48 Pembongkaran Cetakan Dan Penyiraman Beton m3
E Pekerjaan Besi & Baja
1 Ongkos kerja Perakitan dan Pemasangan Baja (Erection) Kg
2 Pekerjaan Besi Plat Bordes Kg
3 Pekerjaan Besi Plat Tebal 2 mm Kg
4 Pekerjaan Besi Plat Strip Kg
5 Pekerjaan Besi Baja Profil WF Kg
6 Pekerjaan Besi Baja Kanal C Kg
7 Pekerjaan Besi Baja siku untuk rangka Kg
8 Gorong-gorong Buis Beton diameter = 0.8 (K-225) bertulang t = 8 cm m3
9 Gorong-gorong Buis Beton diameter = 1.00 M (K-225) bertulang t = 10 cm m3
8 Pemasangan Pipa Beton dia 20 cm m1
9 Pemasangan Pipa Beton dia 30 cm m1
10 Pemasangan Pipa Beton dia 40 cm m1
11 Pemasangan Pipa Beton dia 50 cm m1
12 Pemasangan Pipa Beton dia 60 cm m1
13 Pemasangan Pipa Beton dia 80 cm m1
14 Pemasangan Pipa Beton dia 100 cm m1
15 Pasangan Gorong-Gorong Buis Beton dia.100 cm dg Cincin Batu Bata m1
15 Pasangan Gorong-Gorong Buis Beton dia.40 cm Dg Beton Massa K -125 m1
16 Pasangan Gorong-Gorong Buis Beton dia.50 cm Dg Beton Massa K -125 m1
17 Pasangan Gorong-Gorong Buis Beton dia.60 cm Dg Beton Massa K -125 m1
18 Pasangan Gorong-Gorong Buis Beton dia.80 cm Dg Beton, Menggunakan Buruh m1
Gorong-Gorong Kotak Pasangan Batu dengan Penutup Beton Bertulang Uk.1 M X 1 M,
19 m1
Menggunakan Buruh
NO URAIAN KEGIATAN SATUAN
20 Bracing m
15 Lantai Kerja m3
15 Pembesian dengan Besi Wiremesh M6 kg
16 Pekerjaan Besi untuk Teralis Pagar Kg
F Pekerjaan Dinding dan Plesteran
1 Pemasangan Batu Merah tebal 1 bata (1 SP : 2 PP) m2
2 Pemasangan Batu Merah tebal 1/2bata (1 SP : 2 PP) m2
3 Pemasangan Batu Merah tebal 1 bata (1 SP : 3 PP) m2
1 Pemasangan Batu Merah tebal 1/2 bata (1 SP : 3 PP) m2
2 Pemasangan Batu Merah tebal 1 bata (1 SP : 4 PP) m2
3 Pemasangan Batu Merah tebal 1/2bata (1 SP : 4 PP) m2
2 Pemasangan Batu Merah tebal 1 bata (1 SP : 5 PP) m2
3 Pemasangan Batu Merah tebal 1/2bata (1 SP : 5 PP) m2
4 Pemasangan Batu Merah tebal 1 bata (1 SP : 6 PP) m2
5 Pemasangan Batu Merah tebal 1/2bata (1 SP : 6 PP) m2
6 Pasang Dinding Hollowblock ( HB10 ) Campuran 1SP : 4PP m2
7 Pasang dinding rooster 12x11x24 cm campuran 1 SP : 3PP m2
8 Pasang dinding rooster 12x11x24 cm campuran 1 SP : 4PP m2
9 Plesteran 1 SP : 2 PP tebal 15 mm m2
10 Plesteran 1 SP : 3 PP tebal 15 mm m2
11 Plesteran speci 1 Pc : 3 Ps tebal 15 mm untuk bangunan basah m2
16 Plesteran 1 SP : 4 PP tebal 15 mm m2
4 Plesteran 1 SP : 5 PP tebal 15 mm m2
5 Plesteran 1 SP : 6 PP tebal 15 mm m2
6 Plesteran 1 SP : 2 PP tebal 20 mm m2
7 Plesteran 1 SP : 3 PP tebal 20 mm m2
8 Plesteran 1 SP : 4 PP tebal 20 mm m2
9 Plesteran 1 SP : 5 PP tebal 20 mm m2
10 Plesteran 1 SP : 6 PP tebal 20 mm m2
11 Plesteran Skoning 1 SP : 3 PP Lebar 10 Cm m1
5 Plesteran Benangan Sudut m1
6 Plesteran Ciprat 1 SP : 2 PP m2
7 Plesteran Siar adukan 1 SP : 2 PP untuk pasangan batu kali m2
8 Plesteran Siar adukan 1 Pc : 2 Ps untuk bangunan basah m2
7 Acian m2
8 Pemasangan Batu Merah Kosongan tebal 1 bata m2
G Pekerjaan Lantai
1 Pasang Lantai Keramik Tipe Granit Setara Ex. Granito uk. 40x40 cm (Motif/Warna) m2
NO URAIAN KEGIATAN SATUAN
L Sanitair
1 Pemasangan Dasar Saluran R.25 Segmen m1
2 Pemasangan Dasar Saluran R.15 Segmen m1
3 Pemasangan Dasar Saluran R.10 Segmen m1
4 Pemasangan Dasar Saluran R.25 (1/2 lingkaran) m1
5 Pemasangan Dasar Saluran R.15 (1/2 lingkaran) m1
6 Pemasangan Dasar Saluran R.10 (1/2 lingkaran) m1
1 Pemasangan Kran Air Model Engkol Buah
2 Pemasangan Kloset Jongkok Porselen Buah
2 Pemasangan Kloset Duduk ex. INA komplit Buah
3 Pemasangan Wastafel Bahan Keramik Buah
4 Pemasangan Wastafel ex. TOTO Buah
5 Pemasangan Urinoir Buah
6 Pemasangan Bak Mandi Batu Bata Volume 0.3 m3 Buah
13 Memasang Bak Kontrol Pasangan Batu bata uk 30x30 cm, Tinggi 35 cm Buah
14 Memasang Bak Kontrol Pasangan Batu bata uk 45x45 cm, Tinggi 50 cm Buah
15 Pemasangan Bak cuci piring stainless steel dan accessories Buah
4 Pemasangan Floor Drain Buah
5 Pemasangan Kran Bebek Fio 10 JC Buah
M Pagar
1 Pemasangan Pagar Model BRC/PMG A m2
2 Pasang Tiang Pagar Model PMG 2" m1
3 Pasang Daun Pintu Swing Ganda Type BRC/PMG ukuran. (1,2 x 3) meter Unit
4 Pasang Daun Pintu Dorong Type BRC/PMG ukuran. (1,2 x 3) meter Unit
1 Pemasangan Pagar Besi Pipa HOLLO m2
N Pipa
1 Pemasangan Pipa Stainless Termasuk Elektrode m1
1 Pekerjaan Besi Pipa Stainless 5/8 " m1
2 Pekerjaan Besi Pipa Stainless 1.25 " m1
3 Pekerjaan Besi Pipa Stainless 1.5 " m1
1 Pekerjaan Besi Pipa Stainless 2 " m1
6 Pemasangan Pipa Galvanis Termasuk Elektrode m1
5 Pemasangan Pipa Galvanis Diameter 3/4 " m1
6 Pemasangan Pipa Galvanis Diameter 1 " m1
7 Pemasangan Pipa Galvanis Diameter 1,5 " m1
8 Pemasangan Pipa Galvanis Diameter 3 " m1
9 Pemasangan Pipa Galvanis Diameter 4 " m1
10 Pengadaan dan Pemasangan Pipa GI Dia. 3/4" m1
NO URAIAN KEGIATAN SATUAN
Rp 390,203.67
Rp 4,029,931.26
Rp 4,703,131.26
Rp 5,914,577.51
Rp 8,534,777.51
Rp 10,005,477.51
Rp 11,596,471.94
Rp 1,550,531.26
Rp 2,186,331.26
Rp 3,226,931.26
Rp 4,466,977.51
Rp 52,669.98
Rp 720,303.60
Rp 106,714.67
Rp 310,968.36
Rp 180,490.97
Rp 1,136,475.34
Rp 277,735.55
Rp 443,147.38
Rp 8,745.55
Rp 108,991.92
Rp 173,784.19
Rp 210,958.89
Rp 285,308.28
Rp 523,633.51
ANALISA
(%)
2019
Rp 566,111.50
Rp 521,474.54
Rp 2,130,230.24
Rp 543,295.29
Rp 614,152.48
Rp 13,588.11
Rp 14,173.83
Rp 30,246.88
Rp 43,389.38
Rp 77,049.48
Rp 1,612,983.30
Rp 1,612,983.30
Rp 1,512,416.66
Rp 1,512,416.66
Rp 1,459,568.88
Rp 1,459,568.88
Rp 1,861,479.79
Rp 3,048,232.79
Rp 2,238,779.48
Rp 2,187,833.48
Rp 1,397,902.78
Rp 1,051,828.98
Rp 1,180,569.31
Rp 432,879.90
Rp 695,574.54
Rp 22,280.34
Rp 187,912.39
Rp 140,186.14
Rp 238,644.11
Rp 510,912.17
Rp 299,893.67
ANALISA
(%)
2019
Rp 4,500.00
Rp 6,295.85
Rp 16,500.00
Rp 2,806.10
Rp 76,368.70
Rp 57,376.09
Rp 20,127.87
Rp 46,447.50
Rp 55,687.50
Rp 63,758.75
Rp 67,058.75
Rp 70,358.75
Rp 8,194.19
Rp 10,631.13
Rp 111,457.50
Rp 123,750.00
Rp 149,496.88
Rp 155,271.88
Rp 159,396.88
Rp 103,125.00
Rp 114,840.00
Rp 140,421.88
Rp 148,671.88
Rp 159,396.88
Rp 68,475.00
Rp 82,500.00
Rp 47,610.75
Rp 60,201.90
Rp 65,126.60
Rp 278,685.00
Rp 309,375.00
Rp 135,176.25
Rp 151,676.25
Rp 161,576.25
Rp 27,225.00
Rp 35,849.00
Rp 431,640.00
Rp 25,498.00
ANALISA
(%)
2019
Rp 19,096.00
Rp 20,944.00
Rp 27,412.00
Rp 32,494.00
Rp 46,200.00
Rp 108,036.50
Rp 234,602.83
Rp 1,075,430.40
Rp 875,032.40
Rp 1,136,799.40
Rp 952,197.40
Rp 118,370.60
Rp 941,902.50
Rp 959,288.00
Rp 933,005.70
Rp 950,391.20
Rp 143,433.21
Rp 54,063.42
Rp 53,160.05
Rp 53,259.05
Rp 70,325.03
Rp 66,442.68
Rp 35,375.38
Rp 321,827.00
Rp 1,077,712.35
Rp 1,095,791.68
Rp 1,588,743.75
ANALISA
(%)
2019
Rp 1,991,098.23
Rp 1,608,553.76
Rp 2,230,662.50
Rp 2,158,719.04
Rp 2,159,106.35
Rp 2,976,330.50
Rp 677,836.50
Rp 701,679.94
Rp 987,421.05
Rp 973,267.85
Rp 1,228,562.39
ANALISA
(%)
2019
Rp 1,762,897.95
Rp 1,283,594.73
Rp 1,307,614.39
Rp 1,864,909.20
Rp 552,260.50
Rp 2,180,160.07
Rp 1,843,983.68
Rp 1,889,359.51
Rp 2,111,641.35
Rp 2,138,774.00
Rp 2,670,845.32
Rp 556,385.50
Rp 48,130.78
Rp 414,953.00
Rp 1,031.25
ANALISA
(%)
2019
Rp 491.87
Rp 31,281.25
Rp 37,950.00
Rp 351,143.10
Rp 866,105.90
Rp 75,634.90
Rp 42,568.35
Rp 17,846.95
Rp 817,139.29
Rp 825,214.06
Rp 838,746.81
Rp 920,455.75
Rp 1,026,152.00
Rp 964,706.42
Rp 1,070,182.67
Rp 988,774.19
Rp 1,094,470.44
Rp 1,017,475.33
Rp 1,123,171.58
Rp 1,044,593.27
Rp 1,150,289.52
Rp 1,065,460.52
Rp 1,171,156.77
Rp 1,064,007.38
Rp 1,169,703.63
Rp 1,087,055.41
Rp 1,192,751.66
Rp 1,094,090.26
Rp 1,199,786.51
Rp 1,166,378.09
Rp 1,308,539.34
Rp 1,175,701.26
Rp 1,317,862.51
Rp 1,407,600.70
Rp 33,825.00
ANALISA
(%)
2019
Rp 41,250.00
Rp 416,638.20
Rp 56,555.40
Rp 41,250.00
Rp 1,379,372.50
Rp 13,793.73
Rp 1,437,122.50
Rp 14,371.23
Rp 1,584,390.50
Rp 15,843.91
Rp 1,642,140.50
Rp 16,421.41
Rp 127,601.43
Rp 83,289.25
Rp 120,323.50
Rp 164,020.45
Rp 122,213.41
Rp 181,324.00
Rp 124,849.56
Rp 120,323.50
Rp 118,757.21
Rp 98,852.71
Rp 181,324.00
Rp 131,560.22
Rp 143,586.63
Rp 116,012.71
Rp 96,108.21
Rp 181,324.00
Rp 145,075.59
Rp 89,126.95
Rp 140,406.42
Rp 112,832.50
Rp 107,511.14
Rp 155,871.76
Rp 114,749.69
Rp 3,300.00
Rp 4,950.00
ANALISA
(%)
2019
Rp 331,517.01
Rp 327,043.75
Rp 7,382.10
Rp 235,350.82
Rp 36,299.45
Rp 43,560.00
Rp 166,639.00
Rp 16,663.90
Rp 172,414.00
Rp 17,241.40
Rp 3,039,748.25
Rp 82,412.72
Rp 102,794.89
Rp 50,448.75
Rp 162,573.99
Rp 141,035.13
Rp 182,394.49
Rp 244,745.70
Rp 284,073.45
Rp 353,805.93
Rp 438,058.21
Rp 808,869.93
Rp 91,410.00
Rp 91,410.00
Rp 280,709.92
Rp 376,345.75
Rp 25,696.00
Rp 48,864.75
Rp 65,659.00
Rp 115,440.88
Rp 158,406.88
Rp 313,442.25
Rp 33,093.50
Rp 38,847.88
Rp 74,094.63
Rp 95,449.75
ANALISA
(%)
2019
Rp 174,783.13
Rp 2,695,440.00
Rp 8,806,820.70
Rp 11,820.05
Rp 1,353,250.25
Rp 2,001,505.00
Rp 177,320.00
Rp 1,189,787.50
Rp 464,668.95
Rp 162,569.00
Rp 1,726,210.75
Rp -
Rp 9,963.36
Rp 19,501.13
Rp 30,015.59
Rp 28,967.62
Rp 47,872.17
Rp 46,665.41
Rp 74,363.03
Rp 29,577.79
Rp 49,002.09
Rp 47,935.42
Rp 76,306.45
Rp 75,036.45
Rp 121,561.77
Rp 91,318,213.71
Rp 37,948,215.16
Rp 20,412,330.94
Rp 9,070,741.55
Rp ###
260,204.89
Rp ###
127,987.81
Rp ###
139,128.50
Rp ###
376,640.00
Rp ###
31,900.00
ANALISA
(%)
2019
Rp ###
13,200.00
###
Rp 1,909,026.90
Rp ###
9,900.00
Rp ###
19,800.00
Rp ###
549,989.00
Rp ###
22,000.00
###
Rp 1,099,978.00
Rp ###
22,000.00
Rp ###
87,940.55
Rp ###
63,246.21
Rp ###
38,551.87
Rp ###
42,763.78
Rp ###
32,065.00
###
Rp ###
60,500.00
Rp ###
74,250.00
Rp ###
80,520.00
Rp ###
122,100.00
Rp ###
97,350.00
Rp ###
110,440.00
Rp ###
26,510.00
Rp ###
45,232.00
Rp ###
96,250.00
Rp ###
409,750.00
Rp ###
2,750.00
Rp ###
12,375.00
Rp ###
20,625.00
Rp ###
44,000.00
Rp ###
30,250.00
Rp ###
121,000.00
Rp ###
201,278.00
Rp ###
299,200.00
Rp ###
355,894.00
Rp ###
58,756.50
Rp ###
128,348.00
Rp ###
123,898.12
Rp ###
59,519.57
Rp ###
57,068.00
Rp ###
24,112.00
Rp ###
119,030.32
ANALISA
(%)
2019
Rp ###
151,216.01
Rp ###
325,516.13
Rp ###
38,170.00
Rp ###
297,230.32
Rp ###
4,400.00
Rp ###
53,985.80
Rp ###
26,774.00
Rp ###
55,077.00
Rp ###
334,644.42
Rp ###
465,123.08
Rp ###
436,886.51
Rp ###
75,349.67
Rp ###
119,834.00
Rp ###
39,049.40
Rp ###
46,860.00
Rp ###
74,250.00
Rp ###
3,382.62
Rp ###
137,264.23
Rp ###
13,037.75
Rp ###
181,436.64
Rp ###
73,128.00
Rp ###
477,674.94
Rp ###
23,386.29
Rp ###
140,272.00
###
Rp ###
965,100.40
Rp ###
844,789.00
Rp ###
846,692.00
Rp ###
806,610.75
Rp ###
753,746.08
Rp ###
778,783.50
Rp ###
759,239.25
Rp ###
732,404.75
Rp ###
376,835.58
Rp ###
2,333,961.30
Rp ###
1,040,625.33
Rp ###
157,556.55
Rp ###
374,222.48
Rp ###
348,152.48
ANALISA
(%)
2019
Rp ###
292,858.13
Rp ###
127,173.75
###
Rp ###
185,810.35
Rp ###
239,511.80
Rp ###
158,365.90
Rp ###
259,798.28
Rp ###
168,509.14
Rp ###
387,984.30
Rp ###
243,395.90
Rp ###
396,894.30
Rp ###
247,850.90
Rp ###
479,504.30
Rp ###
289,155.90
Rp ###
347,095.10
Rp ###
222,793.18
Rp ###
364,224.30
Rp ###
259,798.28
Rp ###
198,938.85
Rp ###
138,079.43
Rp ###
13,253.90
Rp ###
14,582.15
Rp ###
936,982.12
Rp ###
968,353.84
Rp ###
992,997.05
Rp ###
878,834.09
Rp ###
1,021,982.31
Rp ###
1,050,008.45
Rp ###
1,070,609.56
Rp ###
1,084,838.02
Rp ###
1,109,552.56
Rp ###
1,117,127.56
Rp ###
1,191,260.66
Rp ###
1,201,297.05
Rp ###
1,100,082.50
Rp ###
1,122,522.50
Rp ###
1,144,962.50
Rp ###
1,167,402.50
Rp ###
1,201,062.50
ANALISA
(%)
2019
###
Rp 1,257,162.50
###
Rp 1,313,262.50
###
Rp 1,369,362.50
###
Rp 1,436,682.50
Err:509 ###
###
Rp 4,208,016.45
###
Rp 2,924,444.60
###
Rp 5,192,941.60
Rp ###
81,666.15
Rp ###
103,251.89
###
Rp 5,616,970.84
###
Rp 6,565,238.35
###
Rp 5,724,457.75
###
Rp 5,959,883.60
Rp ###
231,000.00
###
Rp ###
956.62
Rp ###
33,591.25
Rp ###
33,591.25
Rp ###
27,519.25
Rp ###
28,215.00
Rp ###
27,962.00
Rp ###
27,645.75
###
#REF!
###
#REF!
Rp ###
119,402.36
Rp ###
203,566.11
Rp ###
220,891.11
Rp ###
238,326.11
Rp ###
261,536.11
Rp ###
400,631.11
Rp ###
505,021.11
Rp ###
850,024.60
###
#REF!
###
#REF!
###
#REF!
Rp ###
1,185,109.44
Rp ###
5,035,641.57
ANALISA
(%)
2019
Rp ###
128,056.12
Rp ###
849,968.76
Rp ###
14,368.21
Rp ###
24,230.25
###
Rp ###
272,188.13
Rp ###
131,677.56
Rp ###
261,868.06
Rp ###
126,250.99
Rp ###
254,014.06
Rp ###
123,446.13
Rp ###
251,281.25
Rp ###
121,700.70
Rp ###
253,166.38
Rp ###
121,250.80
Rp ###
246,056.39
Rp ###
341,151.25
Rp ###
557,301.25
Rp ###
61,623.76
Rp ###
59,381.74
Rp ###
69,581.82
Rp ###
57,674.10
Rp ###
56,947.66
Rp ###
56,264.34
Rp ###
82,498.68
Rp ###
67,739.32
Rp ###
77,118.80
Rp ###
76,263.88
Rp ###
75,239.12
Rp ###
55,479.88
Rp ###
10,472.69
Rp ###
43,502.80
Rp ###
53,715.48
Rp ###
52,777.40
Rp ###
31,779.69
Rp ###
160,193.00
###
Rp ###
403,535.83
ANALISA
(%)
2019
Rp ###
50,899.82
Rp ###
140,955.38
Rp ###
133,491.88
Rp ###
144,775.13
Rp ###
116,315.38
Rp ###
122,205.88
Rp ###
104,697.12
Rp ###
384,854.64
Rp ###
431,494.64
Rp ###
591,309.13
Rp ###
32,686.50
Rp ###
147,557.85
Rp ###
414,004.64
Rp ###
443,154.64
Rp ###
548,218.14
Rp ###
594,858.14
Rp ###
146,716.63
Rp ###
495,876.29
Rp ###
525,026.29
Rp ###
223,447.13
Rp ###
264,257.13
Rp ###
346,460.13
Rp ###
436,125.53
Rp ###
268,687.93
Rp ###
356,137.93
Rp ###
228,011.85
Rp ###
268,821.85
Rp ###
351,024.85
Rp ###
440,690.25
Rp ###
273,252.65
Rp ###
360,702.65
###
###
Rp 23,740,832.50
###
Rp 14,049,761.00
###
Rp 10,556,975.00
###
Rp 23,684,056.00
###
Rp 16,259,056.00
###
Rp 12,448,744.00
ANALISA
(%)
2019
###
Rp 21,919,975.00
###
Rp 15,113,725.00
###
Rp 11,620,939.00
Rp ###
278,437.06
Rp ###
185,045.61
Rp ###
134,666.20
Rp ###
194,719.25
Rp ###
197,380.93
Rp ###
171,991.08
Rp ###
176,846.34
Rp ###
184,524.20
Rp ###
71,357.88
Rp ###
99,243.62
Rp ###
56,939.12
Rp ###
76,413.93
Rp ###
218,726.75
Rp ###
214,559.40
Rp ###
135,321.30
Rp ###
311,539.25
Rp ###
283,254.95
Rp ###
41,132.67
Rp ###
47,526.42
Rp ###
58,751.00
Rp ###
70,259.75
Rp ###
106,491.00
Rp ###
88,020.17
###
Rp ###
57,763.75
Rp ###
78,441.00
Rp ###
20,691.00
Rp ###
94,518.05
Rp ###
214,225.00
Rp ###
151,316.00
Rp ###
174,691.00
Rp ###
159,291.00
Rp ###
169,191.00
Rp ###
153,791.00
Rp ###
202,191.00
ANALISA
(%)
2019
Rp ###
49,085.30
Rp ###
70,909.30
Rp ###
143,511.50
Rp ###
71,870.70
Rp ###
124,384.70
Rp ###
66,734.25
Rp ###
187,453.20
Rp ###
155,228.70
Rp 278,278.46
Rp ###
74,431.50
Rp ###
59,306.50
Rp ###
137,645.75
Rp ###
189,840.75
Rp ###
850,989.70
Rp ###
77,522.06
Rp ###
112,497.00
Rp ###
156,222.00
Rp ###
182,072.00
Rp ###
217,233.50
Rp ###
119,113.50
Rp ###
142,741.50
Rp ###
190,732.54
Rp ###
227,066.84
Rp ###
217,876.85
Rp ###
241,383.85
Rp ###
121,385.00
Rp ###
245,832.20
Rp ###
147,979.02
Rp ###
248,922.47
Rp ###
149,257.19
Rp ###
313,373.82
Rp ###
199,211.77
Rp ###
45,430.00
###
Rp ###
201,297.80
Rp ###
189,185.70
Rp ###
172,159.31
Rp ###
207,353.85
ANALISA
(%)
2019
Rp ###
194,533.90
Rp ###
176,512.46
Rp ###
31,830.15
Rp ###
74,602.00
Rp ###
18,467.35
Rp ###
45,985.50
Rp ###
31,317.00
Rp ###
39,739.26
Rp ###
55,995.50
Rp ###
39,315.54
Rp ###
49,018.42
Rp ###
121,704.52
###
#REF!
Rp ###
37,779.50
Rp ###
48,295.50
Rp ###
122,725.19
Rp ###
106,984.25
Rp ###
643,665.00
Rp ###
425,983.93
###
###
Rp 21,819,778.75
###
Rp 15,702,678.75
###
Rp 11,892,366.75
Rp ###
975,270.18
Rp ###
654,045.70
Rp ###
615,204.70
Rp ###
955,553.21
Rp ###
676,070.18
Rp ###
937,126.85
Rp ###
574,707.65
Rp 1,211,145.10###
Rp ###
848,725.90
Rp ###
961,317.06
Rp ###
743,865.54
Rp ###
694,534.50
Rp 1,686,586.66###
Rp 1,106,715.94###
Rp ###
290,950.00
ANALISA
(%)
2019
Rp ###
170,717.25
Rp ###
164,914.75
Rp ###
190,203.75
Rp ###
215,667.65
Rp ###
299,883.65
Rp ###
795,257.65
Rp ###
946,507.65
###
Rp 1,373,373.65
Rp ###
527,253.65
Rp ###
372,297.75
Rp ###
595,166.00
Rp ###
336,253.50
Rp ###
55,695.75
Rp ###
143,000.00
Rp ###
109,890.00
Rp ###
289,080.00
Rp ###
497,255.00
Rp ###
30,140.00
Rp ###
54,285.00
Rp ###
22,770.00
Rp ###
49,555.00
Rp ###
68,145.00
Rp ###
876,793.50
Rp ###
22,550.00
Rp ###
17,930.00
Rp ###
82,555.00
Rp ###
158,620.00
Rp ###
151,415.00
Rp ###
263,835.00
Rp ###
193,545.00
Rp ###
244,530.00
Rp ###
39,160.00
Rp ###
233,392.50
Rp ###
8,360.00
Rp ###
14,850.00
Rp ###
63,779.87
Rp ###
166,145.87
Rp ###
52,081.70
ANALISA
(%)
2019
Rp ###
154,941.05
Rp ###
140,058.05
Rp ###
142,841.05
Rp ###
539,525.25
Rp ###
974,462.50
Rp ###
590,493.75
Rp ###
688,352.50
Rp ###
549,257.50
Rp ###
952,403.65
Rp ###
201,492.50
###
Rp 2,156,462.00
###
Rp 2,024,792.00
###
Rp 1,599,345.00
###
Rp 1,893,045.00
ANALISA
(%)
2019
###
Rp ###
136,785.00
Rp ###
102,025.00
Rp ###
78,430.00
Rp ###
99,220.00
Rp ###
71,775.00
Rp ###
52,800.00
Rp ###
127,688.00
Rp ###
444,097.50
###
Rp 2,130,645.00
Rp ###
727,202.30
Rp ###
727,202.30
###
Rp 1,611,912.50
###
Rp 1,533,119.50
Rp ###
419,514.15
Rp ###
632,936.15
Rp ###
311,795.00
Rp ###
78,265.00
Rp ###
241,120.00
###
Rp ###
224,331.00
Rp ###
226,985.00
Rp ###
184,800.00
Rp ###
184,800.00
Rp ###
432,611.93
###
Rp ###
10,527.17
Rp ###
66,526.33
Rp ###
80,981.60
Rp ###
109,099.03
Rp ###
153,892.25
Rp ###
10,552.91
Rp ###
74,706.96
Rp ###
105,482.21
Rp ###
162,778.92
Rp ###
337,571.67
Rp ###
472,664.50
Rp ###
74,706.96
ANALISA
(%)
2019
Rp ###
105,482.21
Rp ###
186,494.00
Rp ###
211,659.25
Rp ###
330,339.17
Rp ###
472,590.25
Rp ###
873,430.25
Rp ###
558,947.95
Rp ###
570,717.95
Rp ###
119,111.80
Rp ###
203,828.26
Rp ###
23,049.81
Rp ###
29,217.65
Rp ###
37,384.60
Rp ###
45,790.25
Rp ###
68,131.25
Rp ###
119,967.65
Rp ###
165,064.90
Rp ###
76,953.58
Rp ###
106,339.53
Rp ###
153,218.18
Rp ###
49,852.00
Rp ###
64,317.00
Rp ###
96,030.00
Rp ###
641,256.91
Rp ###
338,697.51
Rp ###
227,348.25
Rp ###
25,970.21
Rp ###
42,672.67
Rp ###
75,746.00
Rp ###
111,525.33
Rp ###
213,458.67
Rp ###
59,998.44
###
Rp ###
12,823.25
Rp ###
14,113.00
Rp ###
12,936.00
Rp ###
16,755.20
Rp ###
43,628.75
ANALISA
(%)
2019
Rp ###
37,574.90
Rp ###
46,181.74
Rp ###
14,397.90
Rp ###
4,900.50
Rp ###
2,219.80
Rp ###
22,418.44
Rp ###
53,838.99
Rp ###
53,552.99
Rp ###
12,137.62
Rp ###
206,180.15
Rp ###
27,070.45
Rp ###
55,501.60
Rp ###
32,866.90
Rp ###
22,418.44
Rp ###
24,882.28
Rp ###
55,022.00
###
Rp ###
390,100.56
Rp ###
382,477.56
Rp ###
382,961.56
Rp ###
312,842.06
Rp ###
224,169.94
Rp ###
226,589.94
Rp ###
432,874.06
Rp ###
424,404.06
Rp ###
76,837.75
###
Rp 1,566,620.00
###
Rp ###
254,226.50
Rp ###
428,946.10
Rp ###
518,596.10
Rp ###
15,922.50
Rp ###
20,542.50
Rp ###
136,097.50
Rp ###
98,147.50
Rp ###
43,752.50
Rp ###
9,762.50
Rp ###
438,762.50
ANALISA
(%)
2019
Rp ###
8,311.19
Rp ###
50,022.50
Rp ###
339,735.00
Rp ###
402,985.00
Rp ###
497,860.00
Rp ###
755,590.00
Rp ###
275,522.50
Rp ###
298,067.00
Rp ###
365,200.00
Rp ###
238,810.00
###
Rp ###
112,483.69
Rp ###
182,007.65
Rp ###
161,670.58
XIII. BIAYA JASA PENUNJANG OPERASIONAL KEGIATAN
KODE
NO NAMA BARANG MERK / UKURAN SATUAN
BARANG
1 2 3 4 5
22 BIAYA UPAH PENUNJANG KEGIATAN
22.01 BIAYA JASA NON PNS
22.01.01 JASA KONSTRUKSI
22.01.01.01 Kepala Tukang
1 22.01.01.01.01 Kepala Tukang Batu O.H
2 22.01.01.01.02 Kepala Tukang Besi O.H
3 22.01.01.01.03 Kepala Tukang Cat O.H
4 22.01.01.01.04 Kepala Tukang Gali Tanah O.H
5 22.01.01.01.05 Kepala Tukang Kayu O.H
6 22.01.01.01.06 Kepala Tukang Listrik O.H
7 22.01.01.01.07 Kepala Tukang Pipa O.H
8 22.01.01.01.08 Kepala Tukang Sapu O.H
9 22.01.01.01.09 Mandor O.H
10 Kepala Tukang Taman O.H
11 Kepala Tukang Las O.H
12 Kepala Tukang Cat Mobil O.H
22.01.01.02 Tukang
1 22.01.01.02.01 Tukang Batu OH
2 22.01.01.02.02 Tukang Besi OH
3 22.01.01.02.03 Tukang Cat OH
4 22.01.01.02.04 Tukang Cat Mobil OH
5 22.01.01.02.05 Tukang Gali Jalan OH
6 22.01.01.02.06 Tukang Gali Lumpur OH
7 22.01.01.02.07 Tukang Gali Tanah OH
8 22.01.01.02.08 Tukang Kayu OH
9 22.01.01.02.09 Tukang Las OH
10 22.01.01.02.10 Tukang Listrik OH
11 22.01.01.02.11 Tukang Pipa OH
12 22.01.01.02.12 Tukang Plitur OH
13 22.01.01.02.13 Tukang Potong Pohon OH
14 22.01.01.02.14 Tukang Sapu OH
15 22.01.01.02.15 Tukang Tanam OH
16 22.01.01.02.16 Tukang Poles OH
Tukang Taman OH
Tukang Potong Rumput OH
22.01.01.03 Pekerja Terampil/ Pembantu Tukang
1 22.01.01.03.01 Colter/Kalibrasi O.H
2 22.01.01.03.02 Juru Ukur OH
3 22.01.01.03.03 Mekanik mesin OH
4 22.01.01.03.04 Mekanik Pembantu OH
5 22.01.01.03.05 Pembantu Operator OH
6 22.01.01.03.06 Operator OH
7 22.01.01.03.07 Pekerja (buruh tak trampil) OH
8 22.01.01.03.08 Pekerja (buruh agak trampil) OH
9 22.01.01.03.09 Pekerja (buruh trampil) OH
10 22.01.01.03.10 Pembantu Operator Alat Konsruksi OH
11 22.01.01.03.11 Pembantu Sopir OH
12 22.01.01.03.12 Penganyam Bronjong OH
13 22.01.01.03.13 Penjaga OH
74
1 2 3 4 5
14 22.01.01.03.14 Sopir OH
15 22.01.01.03.15 Tenaga Logistik OH
22.01.01.04 Tenaga Pendukung Jasa Konstruksi
1 22.01.01.04.01 Asisten Geologi OH
2 22.01.01.04.02 Site Manager OH
3 22.01.01.04.03 Asisten Driller OH
4 22.01.01.04.04 Driller OH
5 22.01.01.04.05 Kepala Pemompaan Uji OH
6 22.01.01.04.06 Tenaga Ahli Geologi OH
7 22.01.01.04.07 Tool Pusher OH
8 22.01.01.04.08 Watchman OH
22.01.02 JASA PEMELIHARAAN
22.01.02.01 Tenaga Perbaikan Mesin Penggerak
1 22.01.02.01.01 Pengecatan Mesin Unit
2 22.01.02.01.02 Penyempurnaan Panel Unit Bh
3 22.01.02.01.03 Perbaikan Knalpot Bh
4 22.01.02.01.04 Perbaikan Oil Pump Bh
5 22.01.02.01.05 Poles Liner Bh
6 22.01.02.01.06 Rebuilt Stang Piston Bh
7 22.01.02.01.07 Rekondisi Dinamo Amper Unit
8 22.01.02.01.08 Rekondisi Dinamo Stater Unit
9 22.01.02.01.09 Service Oil Cooller Bh
10 22.01.02.01.10 Skur Valve Bh
11 22.01.02.01.11 Slep dan Sentering As Cruck Bh
12 22.01.02.01.12 Test dan service Boschpump Unit
13 22.01.02.01.13 Test dan service Nozle Bh
22.01.02.02 Tenaga Pemeliharaan AC
1 22.01.02.02.01 Ganti Kompresor AC Windows 1 PK Unit
2 22.01.02.02.02 Ganti Kompresor AC Windows 1,5 PK Unit
3 22.01.02.02.03 Ganti Kompresor AC Windows 2 PK Unit
4 22.01.02.02.04 Isi Freon AC AC Split 0,5 - 1 PK Unit
5 22.01.02.02.05 Isi Freon AC AC Split 1,5 – 2 PK Unit
6 22.01.02.02.06 Isi Freon AC AC Split 2 – 2,5 PK Unit
7 22.01.02.02.07 Isi Freon AC AC Split 5 PK Unit
8 22.01.02.02.08 Pemeliharaan 1 PK AC Split Unit
9 22.01.02.02.09 Pemeliharaan 1 PK AC Windows Unit
10 22.01.02.02.10 Pemeliharaan 2 PK AC Split Unit
22.01.02.03 Tenaga Pemeliharaan Mesin Tulis
1 22.01.02.03.01 Service dan Perbaikan Mesin Calculator Unit
2 22.01.02.03.02 Service dan Perbaikan Mesin Hitung Listrik Unit
3 22.01.02.03.03 Service dan Perbaikan Mesin Hitung Manual Unit
4 22.01.02.03.04 Service dan Perbaikan Mesin Hitung Tangan Unit
5 22.01.02.03.05 Service dan Perbaikan Mesin Tulis KK Listrik Unit
6 22.01.02.03.06 Service dan Perbaikan Mesin Tulis KK Manual Unit
22.01.02.04 Tenaga Pemeliharaan Kendaraan
1 22.01.02.04.01 Penggantian Ban Unit
2 22.01.02.04.02 Service/Tune up Unit
3 22.01.02.04.03 Turun Garden unit
4 22.01.02.04.04 Turun Mesin Bensin Unit
5 22.01.02.04.05 Turun Mesin Solar Unit
6 22.01.02.04.06 Turun Versenelling Unit
22.01.02.05 Tenaga Pemeliharaan Mebelair
1 22.01.02.05.01 Perbaikan Dan Pelitur Meja buah
75
1 2 3 4 5
2 22.01.02.05.02 Perbaikan Kursi buah
3 22.01.02.05.03 Perbaikan Meja buah
22.01.03 JASA KONSULTASI
22.01.03.01 Tenaga Ahli Pembina Kepala
1 22.01.03.01.01 Ahli Pembina Kepala S1 ( Pengalaman Kerja 21 Th ) OB
2 22.01.03.01.02 Ahli Pembina Kepala S1 ( Pengalaman Kerja 22 Th ) OB
3 22.01.03.01.03 Ahli Pembina Kepala S1 ( Pengalaman Kerja 23 Th ) OB
4 22.01.03.01.04 Ahli Pembina Kepala S1 ( Pengalaman Kerja 24 Th ) OB
5 22.01.03.01.05 Ahli Pembina Kepala S1 ( Pengalaman Kerja 25 Th ) OB
6 22.01.03.01.06 Ahli Pembina Kepala S2 ( Pengalaman Kerja 17 Th ) OB
7 22.01.03.01.07 Ahli Pembina Kepala S2 ( Pengalaman Kerja 18 Th ) OB
8 22.01.03.01.08 Ahli Pembina Kepala S2 ( Pengalaman Kerja 19 Th ) OB
9 22.01.03.01.09 Ahli Pembina Kepala S2 ( Pengalaman Kerja 20 Th ) OB
10 22.01.03.01.10 Ahli Pembina Kepala S2 ( Pengalaman Kerja 21 Th ) OB
11 22.01.03.01.11 Ahli Pembina Kepala S3 ( Pengalaman Kerja 13 Th ) OB
12 22.01.03.01.12 Ahli Pembina Kepala S3 ( Pengalaman Kerja 14 Th ) OB
13 22.01.03.01.13 Ahli Pembina Kepala S3 ( Pengalaman Kerja 15 Th ) OB
14 22.01.03.01.14 Ahli Pembina Kepala S3 ( Pengalaman Kerja 16 Th ) OB
15 22.01.03.01.15 Ahli Pembina Kepala S3 ( Pengalaman Kerja 17 Th ) OB
22.01.03.02 Tenaga Ahli Kepala
1 22.01.03.02.01 Ahli S1 ( Pengalaman Kerja 17 Th ) OB
2 22.01.03.02.02 Ahli S1 ( Pengalaman Kerja 18 Th ) OB
3 22.01.03.02.03 Ahli S1 ( Pengalaman Kerja 19 Th ) OB
4 22.01.03.02.04 Ahli S1 ( Pengalaman Kerja 20 Th ) OB
5 22.01.03.02.05 Ahli S2 ( Pengalaman Kerja 13 Th ) OB
6 22.01.03.02.06 Ahli S2 ( Pengalaman Kerja 14 Th ) OB
7 22.01.03.02.07 Ahli S2 ( Pengalaman Kerja 15 Th ) OB
8 22.01.03.02.08 Ahli S2 ( Pengalaman Kerja 16 Th ) OB
9 22.01.03.02.09 Ahli S3 ( Pengalaman Kerja 9 Th ) OB
10 22.01.03.02.10 Ahli S3 ( Pengalaman Kerja 10 Th ) OB
11 22.01.03.02.11 Ahli S3 ( Pengalaman Kerja 11 Th ) OB
12 22.01.03.02.12 Ahli S3 ( Pengalaman Kerja 12 Th ) OB
22.01.03.03 Tenaga Ahli Utama
1 22.01.03.03.01 Ahli Utama S1 ( Pengalaman Kerja 13 Th ) OB
2 22.01.03.03.02 Ahli Utama S1 ( Pengalaman Kerja 14 Th ) OB
3 22.01.03.03.03 Ahli Utama S1 ( Pengalaman Kerja 15 Th ) OB
4 22.01.03.03.04 Ahli Utama S1 ( Pengalaman Kerja 16 Th ) OB
5 22.01.03.03.05 Ahli Utama S2 ( Pengalaman Kerja 9 Th ) OB
6 22.01.03.03.06 Ahli Utama S2 ( Pengalaman Kerja 10 Th ) OB
7 22.01.03.03.07 Ahli Utama S2 ( Pengalaman Kerja 11 Th ) OB
8 22.01.03.03.08 Ahli Utama S2 ( Pengalaman Kerja 12 Th ) OB
9 22.01.03.03.09 Ahli Utama S3 ( Pengalaman Kerja 5 Th ) OB
10 22.01.03.03.10 Ahli Utama S3 ( Pengalaman Kerja 6 Th ) OB
11 22.01.03.03.11 Ahli Utama S3 ( Pengalaman Kerja 7 Th ) OB
12 22.01.03.03.12 Ahli Utama S3 ( Pengalaman Kerja 8 Th ) OB
22.01.03.04 Tenaga Ahli Madya
1 22.01.03.04.01 Ahli Madya S1 ( Pengalaman Kerja 9 Th ) OB
2 22.01.03.04.02 Ahli Madya S1 ( Pengalaman Kerja 10 Th ) OB
3 22.01.03.04.03 Ahli Madya S1 ( Pengalaman Kerja 11 Th ) OB
4 22.01.03.04.04 Ahli Madya S1 ( Pengalaman Kerja 12 Th ) OB
5 22.01.03.04.05 Ahli Madya S2 ( Pengalaman Kerja 5 Th ) OB
6 22.01.03.04.06 Ahli Madya S2 ( Pengalaman Kerja 6 Th ) OB
7 22.01.03.04.07 Ahli Madya S2 ( Pengalaman Kerja 7 Th ) OB
8 22.01.03.04.08 Ahli Madya S2 ( Pengalaman Kerja 8 Th ) OB
76
1 2 3 4 5
9 22.01.03.04.09 Ahli Madya S3 ( Pengalaman Kerja 1 Th ) OB
10 22.01.03.04.10 Ahli Madya S3 ( Pengalaman Kerja 2 Th ) OB
11 22.01.03.04.11 Ahli Madya S3 ( Pengalaman Kerja 3 Th ) OB
12 22.01.03.04.12 Ahli Madya S3 ( Pengalaman Kerja 4 Th ) OB
22.01.03.05 Tenaga Ahli Muda
1 22.01.03.05.01 Ahli Muda S1 ( Pengalaman Kerja 5 Th ) OB
2 22.01.03.05.02 Ahli Muda S1 ( Pengalaman Kerja 6 Th ) OB
3 22.01.03.05.03 Ahli Muda S1 ( Pengalaman Kerja 7 Th ) OB
4 22.01.03.05.04 Ahli Muda S1 ( Pengalaman Kerja 8 Th ) OB
5 22.01.03.05.05 Ahli Muda S2 ( Pengalaman Kerja 1 Th ) OB
6 22.01.03.05.06 Ahli Muda S2 ( Pengalaman Kerja 2 Th ) OB
7 22.01.03.05.07 Ahli Muda S2 ( Pengalaman Kerja 3 Th ) OB
8 22.01.03.05.08 Ahli Muda S2 ( Pengalaman Kerja 4 Th ) OB
22.01.03.06 Tenaga Ahli Pratama
1 22.01.03.06.01 Ahli Pratama S1 ( Pengalaman Kerja 3 Th ) OB
2 22.01.03.06.02 Ahli Pratama S1 ( Pengalaman Kerja 4 Th ) OB
22.01.03.07 Tenaga Pendukung
1 22.01.03.07.01 Juru Gambar OB
2 22.01.03.07.02 Office Manager OB
3 22.01.03.07.03 Operator Komputer OB
4 22.01.03.07.04 Sekretaris OB
5 22.01.03.07.05 Sekretaris Bilingual OB
6 22.01.03.07.06 Sopir Skywalker OH
7 22.01.03.07.07 Sopir Truk OH
8 22.01.03.07.08 Staf Administrasi OH
9 22.01.03.07.09 Surveyor Geodesi OH
10 22.01.03.07.10 Surveyor Lokasi/Lapangan OH
22.01.03.08 Tenaga Teknisi Komputer
1 22.01.03.08.01 Decomentator OB
2 22.01.03.08.02 Designer OB
3 22.01.03.08.03 Implementator OB
4 22.01.03.08.04 Manager Tim OB
5 22.01.03.08.05 Programer Senior OB
6 22.01.03.08.06 Programer Yunior OB
7 22.01.03.08.07 Sistem Analis OB
8 22.01.03.08.08 Sistem Analis dan Designer OB
9 22.01.03.08.09 Tenaga Data Entry OH
10 22.01.03.08.10 Tenaga Instalansi Jaringan OH
11 22.01.03.08.11 Tenaga Programmer OH
12 22.01.03.08.12 Tenaga Teknisi Hardware OH
13 22.01.03.08.13 Tester OB
77
S
A
T
U
HARGA HARGA
A
SATUAN 2018 N
###
2
0
1
6
95,000
###
95,000
###
95,000
###
95,000
###
95,000
###
95,000
###
95,000
###
95,000
###
100,000
###
95,000
###
95,000
###
95,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
450,000
###
100,000
###
90,000
###
75,000
###
75,000
###
90,000
###
65,000
###
67,500
###
70,000
###
90,000
###
78,800
###
70,000
###
###
78
###
90,000
###
70,000
###
80,000
###
75,000
###
40,000
###
55,000
###
55,000
###
120,000
###
50,000
###
###
200,000
###
266,000
###
200,000
###
100,000
###
86,500
###
80,500
###
1,106,500
###
1,328,000
###
61,000
###
12,500
###
46,500
###
183,000
###
70,000
###
1,000,000
###
2,000,000
###
4,000,000
###
400,000###
350,000###
200,000###
175,000###
75,000
###
75,000
###
100,000
###
40,000
###
50,000
###
40,000
###
###
###
###
40,000
###
100,000
###
200,000
###
500,000
###
550,000
###
200,000
###
75,000
###
79
###
40,000
###
50,000
###
24,210,000
###
25,110,000
###
26,010,000
###
26,610,000
###
27,810,000
###
27,810,000
###
28,890,000
###
29,970,000
###
31,140,000
###
32,220,000
###
30,240,000
###
31,410,000
###
32,670,000
###
33,840,000
###
35,010,000
###
20,610,000
###
21,510,000
###
22,410,000
###
23,310,000
###
23,400,000
###
24,570,000
###
25,650,000
###
26,730,000
###
25,470,000
###
26,640,000
###
27,900,000
###
29,070,000
###
17,010,000
###
17,910,000
###
18,810,000
###
19,710,000
###
19,080,000
###
20,160,000
###
21,240,000
###
22,320,000
###
20,700,000
###
21,870,000
###
23,130,000
###
24,300,000
###
13,410,000
###
14,310,000
###
15,210,000
###
16,110,000
###
14,670,000
###
15,750,000
###
16,830,000
###
17,910,000
###
80
###
15,930,000
###
17,100,000
###
18,360,000
###
19,500,000
###
9,810,000
###
10,710,000
###
11,610,000
###
12,510,000
###
10,260,000
###
11,340,000
###
12,510,000
###
13,590,000
###
8,010,000
###
8,910,000
###
1,600,000
###
2,300,000
###
1,300,000
###
1,200,000
###
2,100,000
###
70,000
###
70,000
###
750,000
###
###
-
###
2,811,400
###
5,622,800
###
5,622,800
###
7,871,900
###
5,000,000
###
1,600,000
###
7,000,000
###
7,000,000
###
75,000
###
80,000
###
80,000
###
100,000
###
5,000,000
###
81
XIII. BIAYA SEWA PERALATAN KEGIATAN
KODE
NO NAMA BARANG MERK / UKURAN
BARANG
1 2 3 4
21.02 BIAYA SEWA
21.02.01. SEWA ALAT KONTRUKSI
21.02.01.01 Sewa Alat Berat
1 21.02.01.01.01 Alat Bantu Strouss Pile
3 21.02.01.01.03 Alat pemadat (Timbris)
18 21.02.01.01.18 Fuel Tank truck
19 21.02.01.01.19 Incinerator
22 21.02.01.01.22 Lune Truck
23 21.02.01.01.23 Mesin Pemadat Vibrator
24 21.02.01.01.24 Mesin Pemotong Rumput Dorong
25 21.02.01.01.25 Mesin Pemotong Rumput Gendong (Chainsaw)
26 21.02.01.01.26 Mesin Poles
27 21.02.01.01.27 Molen
31 21.02.01.01.31 Pengadaan dan Pemasangan
34 21.02.01.01.34 Piellscale (bahan Marmer)
Pompa turbine
35 21.02.01.01.35 Pompa Uji
36 21.02.01.01.36 Road marking machine
40 21.02.01.01.40 Sprayer Selfprop Kapasitas; 1000 L
43 21.02.01.01.43 TC
46 21.02.01.01.46 Tripot dan Timbris.
47 21.02.01.01.47 Truck
48 21.02.01.01.48 Vibrator beton.
21.02.01.02 Sewa Alat Ringan
3 21.02.01.02.03 Alat Bantu Pemasangan Stoplog
21.02.01.03. Sewa Alat Ukur
1 21.02.01.03.01 Sewa Alat Ukur Theodolit
2 21.02.01.03.02 Sewa Waterpass
21.02.03. SEWA ALAT TRANSPORTASI
21.02.03.01. Sewa Mobil Angkutan Barang
6 21.02.03.01.06 Truck Tangki Air
11 21.02.03.01.11 Truk Angkutan Dalam Kota
14 21.02.03.01.14 Dump Truck Kapasitas 3.5 T
HARGA
SATUAN
SATUAN 2018
5
Jam 16,500
Jam 33,600
Jam 114,030
Jam 4,778
Jam 52,763
Unit/Hari 115,500
Unit/Hari 86,650
Unit/Hari 43,350
Unit/Hari 28,900
Unit/Hari 121,300
Unit 127,365
Unit/Hari 26,565,000
Jam 18,218
Jam 24,255
Jam 54,600
Bulan 69,300,000
Unit/Hari 500,000
Unit 333,533
Unit/Hari 97,050
Unit/Hari 42,750
Unit/Hari 202,400
Unit/Hari 6,800
Unit/Hari 866,250
Jam 126,213
Jam 280,000
HARGA BAHAN KONSTRUKSI 2019
NO URAIAN KETERANGAN
1 Bata Merah
2 Bata Ringan
3 Batu Kali Batu Belah Pondasi ( 15/20)
4 Batu Pecah Mesin 5-10 mm
5 Batu Split Pecah Mesin 1/2
6 Batu Split Pecah Mesin 2/3
7 Batu Split Pecah Mesin 3/5
8 Batu Pecah Tangan 5/7
9 Gravel
10 Pasir Beton
11 Pasir Pasang
12 Pasir Urug
13 Tanah Urug
14 Sirtu
15 Tanah Tanam
16 Aspal Bitumen
17 Aspal
18 Aspal Emulsi
19 Asbuton Halus
20 Kerosen / Minyak Tanah
21 Bensin
22 Solar
23 Minyak Pelumas (Oli)
24 Gebalan Rumput
25 Glass Bit
26 Semen ( 50 Kg ) Gresik
27 Semen ( 50 Kg ) Holcim
28 Semen ( 40 Kg ) Gresik
29 Semen ( 40 Kg ) Holcim
30 Semen Warna
31 Besi Beton Polos
32 Besi Beton Ulir
NO URAIAN KETERANGAN
33 Kawat Beton
34 Kawat Seling dia. 10 mm
35 Kawat Bronjong 3'-4"
36 Rangka Atap Baja Ringan Smart Truss
37 Rangka Atap Baja Ringan Kencana
38 Baja WF
39 Kanal C
40 Plat Siku
41 Plat Strip
NO URAIAN KETERANGAN
128 sealent
129 Marmer Ex. Tulungagung 30 x 60 cm
130 Marmer Ex. Tulungagung 60 x 60 cm
131 Marmer Ex. Tulungagung 60 x 60 cm
132 Marmer Ex. Ujung Pandang 30 x 60 cm
133 Marmer Ex. Ujung Pandang 60 x 60 cm
134 Marmer Ex. Ujung Pandang 60 x 120 cm
135 Marmer Ex. Ujung Pandang 150 x 250 rendem
136 Granit Ex. Sumedang 30x60 cm
137 Granit Ex. Sumedang 40x60 cm
138 Granit Ex. Sumedang 60x60 cm
139 Granit Ex. Sumedang 60x90 cm
140 Granit Ex. Sumedang 60x100 cm
141 Granit Ex. Sumedang 60x120 cm
142 Granit Ex. Hijau SR 30x60 cm
143 Granit Ex. Hijau SR 40x60 cm
144 Granit Ex. Hijau SR 60x60 cm
145 Granit Ex. Hijau SR 30xpanjang
146 Marmer Plint
147 Kaca Polos Bening 8 mm
148 Kaca Polos Bening 10 mm
149 Kaca Polos Bening 12 mm
150 Kaca Polos Bening tebal 3mm
151 Kaca Polos Bening tebal 5mm
152 Kaca Rayben tebal 3mm
153 Kaca Rayben tebal 5mm
154 Kaca Kaca Es Tebal 5mm
155 Kaca Vertical Blind
156 Kaca Acrylic, bening uk. 5mm ( 122 x 244 cm )
157 Kaca Acrylic, bening uk. 10mm ( 122 x 244 cm )
158 Kaca Kaca Tempered Warna Tebal 8 mm
159 Kaca Tempered Warna Tebal 10 mm
160 Kaca Kaca Tempered Warna Tebal 12 mm
161 Batu Batako Semen (40x 20x 10 cm)
162 Batu Candi Alur
NO URAIAN KETERANGAN
SAT. HARGA
buah 750
buah 8,750
m3 156,100
m3 258,200
m3 262,900
m3 252,950
m3 236,200
m3 235,000
m3 233,600
m3 310,000
m3 310,000
m3 134,150
m3 75,000
m3 210,000
m3 89,600
Kg 10,500
Kg 10,250
Kg 11,250
Ton 2,500
Liter 12,150
Liter 9,500
Liter 5,750
Liter 25,000
m2 3,750
Kg 36,900
Zak 58,000
Zak 57,000
Zak 48,500
Zak 44,300
Kg 14,500
Kg 10,050
Kg 11,200
SAT. HARGA
Kg 18,000
m 15,000
Kg 17,450
m2 145,000
m2 110,500
Kg 13,200
Kg 13,000
Kg 12,750
Kg 12,650
SAT. HARGA
Batang 33,750
Batang 25,300
Batang 107,500
Batang 85,000
Batang 147,000
Batang 187,500
Batang 315,000
Batang 250,000
Batang 102,500
Batang 125,000
Batang 148,000
Batang 230,000
Batang 300,000
Batang 365,000
Batang 470,000
Batang 685,000
Batang 890,000
Lembar 420,000
btg 115,000
btg 165,000
btg 84,000
btg 115,000
btg 34,000
79,000
115,000
btg 52,000
35,200
Biji 2,100
Biji 4,750
6,000
9,000
Biji 13,800
Biji 10,000
Biji 11,000
Biji 6,550
SAT. HARGA
Biji 14,500
Biji 33,750
Biji 20,000
Biji survei ulang
m2 79,900
m2 95,100
m2 105,900
m1 4,250
m1 104,650
m1 103,000
m1 107,700
m1 120,000
m1 63,700
SAT. HARGA
lembar 650,000
roll 57,500
Buah 5,000
Buah 5,000
Lembar 70,000
Lembar 17,500
Lembar 73,900
Buah 158,100
Buah 2,400,000
Buah 1,500,000
60,000
Buah 371,400
Buah 985,000
Buah 250,000
230,500
307,400
163,800
208,300
238,800
93,000
103,000
95,000
105,000
160,000
125,000
130,000
102,000
m2 55,000
m2 56,000
m2 49,000
m2 59,000
m2 50,000
m2 44,300
m2 50,600
m1 50,000
SAT. HARGA
m2 60,450
m2 111,500
Kg 14,350
Kg 8,150
SAT. HARGA
Botol 10,950
m2 225,000
m2 265,000
300,000
265,000
300,000
335,000
450,000
250,000
275,000
315,000
365,000
400,000
465,000
225,000
235,000
265,000
325000
m1 218,100
m2 161,000
m2 230,600
m2 312,850
m2 94,500
m2 126,000
m2 90,500
m2 121,200
m2 142,100
m2 151,050
buah 1,189,900
buah 2,172,900
m2 640,000
765,000
m2 1,110,000
Buah 4,500
m2 143,750
SAT. HARGA
m2 178,000
m2 185,000
Biji 15,000
Biji 8,450
m2 143,350
m2 149,650
SAT. HARGA
Lembar 79,050
Lembar 105,400
Lembar 71,500
Lembar 139,700
Stel 26,500
m1 192,000
meter 52,000
Biji 40,600
Biji 48,500
Biji 63,250
Biji 79,000
biji 94,850
Biji 67,500
Biji 115,950
Biji 73,800
Biji 140,000
Biji 121,200
Biji 168,650
Biji 23,200
Biji 25,200
Biji 35,750
Biji 38,150
Biji 42,200
kg 22,150
kg 15,850
buah 1,000
buah 250
Set 1,300,000
Set 198,450
buah 350
Lembar 98,350
Lembar 70,000
Lembar 54,400
Lembar 95,000
Lembar 58,000
SAT. HARGA
Lembar 72,500
m2 485,000
m2 500,000
m2 600,000
m2 675,000
SAT. HARGA
m2 400,000
m2 450,000
m2 800,000
Buah 1,129,300
Kotak 22,700
Kotak 36,900
Kotak 20,000
Pasang 33,300
Buah 10,550
Buah 6,350
Buah 75,000
Buah 54,500
Buah 175,000
Buah 77,700
Buah 402,300
Buah 79,050
Buah 49,500
Pasang 125,000
set 10,350
set 21,100
set 18,100
Set 35,000
Set 90,650
Set 186,300
Set 126,500
Set 158,100
Buah 137,000
m 10,450
m 40,500
m 12,500
m 15,000
m 25,000
m 36,000
m 45,000
Bh 273,300
SAT. HARGA
Bh 391,400
m 650,000
Buah 35,000
Unit 81,950
Unit 114,750
SAT. HARGA
Buah 39,350
Buah 41,550
Unit 327,750
Unit 273,100
Unit 665,500
Unit 431,200
Unit 661,600
Unit 387,400
Unit 310,600
Unit 195,700
Unit 20,000
Buah 14,950
Buah 10,950
Buah 3,600
Buah 211,400
75,000
250,000
350,000
m' 11,200
Batang 127,500
Batang 97,920
Batang 46,120
Batang 69,180
Batang 65,280
Batang 85,000
Batang 30,040
Batang 45,060
Batang 1,551,960
Batang 243,120
Batang 126,200
Batang 231,120
Batang 31,650
Batang 336,920
Batang 531,440
Batang 797,160
SAT. HARGA
Batang 702,320
Batang 1,092,320
Batang 1,638,480
Batang 31,950
Batang 45,400
Batang 26,650
Batang 37,900
Batang 21,100
Batang 30,000
Batang 64,200
SAT. HARGA
Batang 91,350
Batang 50,000
Batang 72,100
Batang 74,550
Batang 106,080
Batang 14,350
Batang 20,400
Batang 95,000
Batang 136,700
Batang 7,900
Batang 11,200
Batang 133,860
Batang 69,180
Batang 61,020
Batang 40,680
Batang 46,120
Batang 1,114,920
Batang 1,672,380
Batang 1,519,600
Batang 2,279,400
Batang 60,280
Batang 90,420
Batang 89,240
Batang 129,480
Batang 194,220
Batang 182,080
Batang 273,120
Batang 297,400
Batang 446,100
Batang 361,240
Batang 541,860
Batang 638,880
Batang 958,320
Batang 21,640
Batang 57,750
SAT. HARGA
Batang 57,750
Batang 51,580
Batang 88,950
Batang 88,950
Batang 121,450
SAT. HARGA
Batang 2,174,150
Batang 2,174,150
Batang 2,964,250
Batang 141,150
Batang 141,150
Batang 196,200
Batang 200,400
Batang 200,400
Batang 279,950
Batang 284,200
Batang 284,200
Batang 396,000
Batang 32,490
Batang 417,500
Batang 417,550
Batang 571,800
Batang 855,600
Batang 855,600
Batang 1,154,500
Batang 880,900
Batang 880,900
Batang 1,202,000
Batang 1,362,200
Batang 1,362,200
Batang 1,885,100
Batang 1,400,600
Batang 1,400,600
Batang 1,947,200
Batang 120,000
Batang 170,000
Batang 230,000
Batang 250,000
Batang 300,000
Batang 400,000
Batang 500,000
SAT. HARGA
Batang 650,000
Batang 800,000
Batang 1,400,000
Batang 150,000
Batang
203,150
Batang 300,000
311,450
Batang 380,000
411,100
Batang 450,000
472,300
SAT. HARGA
Batang 550,000
Batang 800,000
Batang 900,000
1,061,800
Batang 1,500,000
1,537,200
Batang 2,000,000
Batang 2,462,800
Batang 305,450
Batang 357,200
Batang 426,050
Batang 651,600
Kg ###
6,000
Buah 30,000
Buah 40,000
Buah 120,000
Buah 220,000
Buah 850,000
Buah 450,000
Buah 230,000
Buah 170,000
Buah 100,000
Buah 5,000
Buah
Buah 200,000
Buah 150,000
Buah 80,000
Buah 15,000
Buah 200,000
Buah 150,000
Buah 80,000
Buah 40,000
Buah 35,000
Buah 350,000
SAT. HARGA
Buah 750,000
Buah 26,000
Buah 20,000
Buah 17,500
Buah 17,800
Buah 75,000
Buah 30,000
SAT. HARGA
Buah 20,000
Buah 5,000
Buah 7,000
Buah 15,000
Buah 20,000
Buah 25,000
Buah 3,000
Buah 10,000
Buah 30,000
Buah 35,000
Buah 50,000
Buah 60,000
Buah 80,000
Buah 130,000
Buah 200,000
380,000
225,000
Buah 175,000
Buah 115,000
Buah 40,000
Buah 400,000
Buah 500,000
700,000
1,000,000
Buah 50,000
Buah 86,400
Buah 250,000
Buah 230,000
Buah 180,000
Buah 150,000
Buah 80,000
Buah 45,000
Buah 21,800
Buah 15,000
Buah 1,500
SAT. HARGA
Buah 2,450
Buah 2,150
Buah 400,000
Buah 230,000
Buah 150,000
Buah 50,000
Buah 6,000
SAT. HARGA
Buah 225,000
Buah 215,000
Buah 200,000
Buah 350,000
500,000
Buah 1,700
Buah 104,000
Buah 40,000
Buah 75,000
125,000
Buah 104,000
Buah 34,000
Buah 150,000
Buah 200,000
Buah 100,000
Buah 80,000
Buah 130,000
Buah 66,650
Buah 82,400
Buah 760,000
Buah 78,750
Buah 190,000
Buah 367,250
Buah 524,250
Buah 1,522,000
2,867,250
Buah 120,000
1,500
4,000
Buah 42,500
Buah 23,000
Buah 7,000
7,500
Buah 10,000
Buah 15,000
SAT. HARGA
Buah 12,700
Buah 450,000
Buah 200,000
Buah 26,500
Buah 350,000
Buah 150,000
Batang 20,800
m3 3,688,450
m3 2,700,000
3,321,000
SAT. HARGA
m3 15,625,000
m3 8,570,000
m3 18,009,150
m3 6,250,000
m3 6,750,000
m3 10,000,000
m3 7,855,000
m3 9,772,350
m3 8,430,650
m3 7,113,400
m3 6,849,900
m3 5,676,050
m3 5,638,000
m3 5,865,350
m3 5,269,150
Lembar 95,000
Lembar 101,200
Lembar 114,700
Lembar 132,800
Lembar 52,700
Lembar 68,000
Kaleng 49,450
Galon 180,450
Kg 61,150
Kg 62,125
Kg 29,750
Liter 28,000
Liter 12,350
Kg 28,500
Liter 42,700
Kg 58,000
Kg 15,200
5Kg 121,200
Galon 105,000
Liter 185,000
SAT. HARGA
Liter 147,550
Kg 23,950
Galon 97,500
Liter 28,600
Liter 13,200
Kg 39,400
Liter 234,500
Liter 253,200
Liter 108,050
Kg 112,500
77,500
SAT. HARGA
55,250
m2 96,800
m2 108,800
m2 115,500
m2 143,000
m1 64,550
m1 117,200
m2 143,000
m2
m2
m2 101,800
m2
m1
m1 84,000
m2
m2
m2
m2
m2
m2 65,000
m2 75,000
Buah 19,000
bh 14,000
bh 30,000
bh 5,500
bh 7,000
DAFTAR UPAH TENAGA KERJA
1 2 3 4
1 Kepala Tukang OH 95,000.00
2 Kepala Tukang Batu OH 95,000.00
3 Kepala Tukang Besi OH 95,000.00
4 Kepala Tukang Cat OH 95,000.00
5 Kepala Tukang Gali Tanah OH 95,000.00
6 Kepala Tukang Kayu OH 95,000.00
7 Kepala Tukang Listrik OH 95,000.00
8 Kepala Tukang Pipa OH 95,000.00
9 Kepala Tukang Sapu OH 95,000.00
16 Mandor OH 100,000.00
17 Operator OH 90,000.00
18 Operator alat berat OH 90,000.00
20 Pekerja OH 70,000.00
21 Pekerja Terampil OH 75,000.00
22 Pemasak aspal OH 75,000.00
23 Pembantu Operator OH 75,000.00
25 Pembantu Sopir OH 75,000.00
26 Pengemudi / Sopir OH 90,000.00
29 Tukang Batu OH 90,000.00
30 Tukang Besi OH 90,000.00
31 Tukang Cat OH 90,000.00
32 Tukang Erection OH 90,000.00
33 Tukang Gali Jalan OH 90,000.00
34 Tukang Gali Lumpur OH 90,000.00
35 Tukang Gali Tanah OH 90,000.00
36 Tukang Kayu OH 90,000.00
38 Tukang Las OH 90,000.00
40 Tukang Listrik OH 90,000.00
41 Tukang Pipa OH 90,000.00
DAFTAR SEWA PERALTAN YANG DISURVEI
NO URAIAN
KETERANGAN SAT. CV BUDI LUHUR
1 Waterpas
UNIT / HARI
2 theodolith
UNIT / HARI
3 Jack Hammer
UNIT / HARI
4 Excavator
UNIT / HARI
5 Pompa Lumpur
UNIT / HARI 175,000.00
6 Stamper
UNIT / HARI
7 Molen
UNIT / HARI 140,000.00
8 Palu / Bodem
BH
9 Pahat Beton
BH
10 Linggis
BH
11 Tripot Tinggi 5 m
UNIT / HARI
12 Alat Pancang + hammer 0.5
UNIT / HARI
ton
13 Mesin Potong Rumput
UNIT / HARI
14 Concrete Pump
UNIT / HARI
15 Vibrator beton 4 HP
UNIT / HARI
16 Gergaji Besi
BH
17 Pompa air 70 -100 ml
UNIT / HARI
18 drilling Rig Borehole diameter
M 225,000.00
8 3/4"
19 Drilling Rig
M 300,000.00
20 Geolistrik
UNIT / HARI
21 Gergaji Listrik
UNIT / HARI
22 Gerindra
UNIT / HARI
23 Generator set 5 Kw
UNIT / HARI
24 Mesin Las Listrik 250A, Diesel
UNIT / HARI 525,000.00
*
25 Sewa Welding Set (min 5 jam)
JAM
26 Sewa alat bantu strouss pile
UNIT / HARI 210,000.00
27 Timbris
UNIT / HARI
28 Kereta Dorong
UNIT / HARI
29 Ganco
BH
30 Keranjang
BH
CV rong cuyu
480,000.00
450,000.00
350,000.00
200,000.00
3,500,000.00
78,000.00
300,000.00
80,000.00
420,000.00
- 141 SATUAN
HARGA - POKOK KEGIATAN TAHUN 2018
III. BIDANG TATA RUANG DAN BANGUNAN GEDUNG
BANGUNAN GEDUNG
Pekerjaan Persiapan & Tanah
A Pekerjaan Persiapan
3 Pengukuran dan pemasangan bowplank m1
Tenaga:
Mandor 0.0050 O.H
Kepala Tukang Kayu 0.0100 O.H
Tukang Kayu 0.1000 O.H
Pekerja 0.1000 O.H
Bahan:
Meranti Papan 2 x 20 x 400 cm 0.0070 m3
Kayu Meranti Kaso 5/7 0.0120 m3
Paku biasa 2" - 3" 0.0200 kg
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
B Pekerjaan Tanah
1 Galian tanah biasa sedalam 1 meter m3
Tenaga:
Mandor 0.0250 O.H
Pekerja 0.7500 O.H
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
7 Pengurugan kembali galian tanah m3
Tenaga:
Mandor 0.0500 O.H
Pekerja 0.5000 O.H
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
9 Pengurugan dengan Pasir Urug m3
Tenaga:
Mandor 0.0100 O.H
Pekerja 0.3000 O.H
- 142 -
NOMOR URAIAN KEGIATAN Koef. SATUAN
Bahan:
Pasir Urug 1.2000 m3
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
12 Timbunan Tanah dari Luar dipadatkan dengan cara m3
mekanis
Tenaga:
Mandor 0.0156 O.H
Pekerja 0.0778 O.H
Bahan:
Tanah Urug 1.2000 m3
Peralatan:
Bulldozer 0.0180 Jam
Vibrator Roller ( 8 T ) 0.0178 Jam
Water Tank Truck 0.0078 Jam
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
17 Pembuatan lubang strouss pile diameter 30 cm m1
Tenaga:
Mandor 0.0240 O.H
Pekerja 0.4800 O.H
Peralatan:
Sewa alat bantu strouss pile 0.4000 jam
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
SATUAN POKOK KEGIATAN TAHUN 2018 - 143 -
NGUNAN GEDUNG
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 500.00
Rp 95,000.00 Rp 950.00
Rp 90,000.00 Rp 9,000.00
Rp 70,000.00 Rp 7,000.00
Rp 5,865,350.00 Rp 41,057.45
Rp 5,638,000.00 Rp 67,656.00
Rp 15,850.00 Rp 317.00
Jumlah Rp 126,480.45
Overhead + Profit ( 10 % ) Rp 12,648.05
Nilai HSPK : Rp 139,128.50
Rp 100,000.00 Rp 2,500.00
Rp 70,000.00 Rp 52,500.00
Jumlah Rp 55,000.00
Overhead + Profit ( 10 % ) Rp 5,500.00
Nilai HSPK : Rp 60,500.00
Rp 100,000.00 Rp 5,000.00
Rp 70,000.00 Rp 35,000.00
Jumlah Rp 40,000.00
Overhead + Profit ( 10 % ) Rp 4,000.00
Nilai HSPK : Rp 44,000.00
Rp 100,000.00 Rp 1,000.00
Rp 70,000.00 Rp 21,000.00
HARGA - 144 -
HARGA
SATUAN
Rp 134,150.00 Rp 160,980.00
Jumlah Rp 182,980.00
Overhead + Profit ( 10 % ) Rp 18,298.00
Nilai HSPK : Rp 201,278.00
Rp 100,000.00 Rp 1,560.00
Rp 70,000.00 Rp 5,446.00
Rp 75,000.00 Rp 90,000.00
Rp 162,250.00 Rp 2,920.50
Rp 313,800.00 Rp 5,585.64
Rp 345,800.00 Rp 2,697.24
Jumlah Rp 108,209.38
Overhead + Profit ( 10 % ) Rp 10,820.94
Nilai HSPK : Rp 119,030.32
Rp 100,000.00 Rp 2,400.00
Rp 70,000.00 Rp 33,600.00
Rp 16,500.00 Rp 6,600.00
Jumlah Rp 42,600.00
Overhead + Profit ( 10 % ) Rp 4,260.00
Nilai HSPK : Rp 46,860.00
-7-
C Pekerjaan Pondasi
Pekerjaan Pondasi
1 Pasangan Batu Kali Belah 15/20 cm (1 SP : 6 PP) m3
Tenaga:
Mandor 0.0750 O.H
Kepala Tukang Batu 0.0750 O.H
Tukang Batu 0.7500 O.H
Pekerja 1.5000 O.H
Bahan:
Semen portland 117.0000 kg
Pasir Pasang 0.5610 m3
Batu Kali Pecah 15/20 cm 1.2000 m3
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
2 Pemasangan Batu Kali Belah Kosongan m3
Tenaga:
Mandor 0.0390 O.H
Kepala Tukang Batu 0.0390 O.H
Tukang Batu 0.3900 O.H
Pekerja 0.7800 O.H
Bahan:
Batu Kali Pecah 15/20 cm 1.2000 m3
Pasir urug 0.4320 m3
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
-8-
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 7,500.00
Rp 95,000.00 Rp 7,125.00
Rp 90,000.00 Rp 67,500.00
Rp 70,000.00 Rp 105,000.00
Rp 1,212.50 Rp 141,862.50
Rp 310,000.00 Rp 173,910.00
Rp 156,100.00 Rp 187,320.00
Jumlah Rp 690,217.50
Overhead + Profit ( 10 % ) Rp 69,021.75
Nilai HSPK : Rp 759,239.25
Rp 100,000.00 Rp 3,900.00
Rp 95,000.00 Rp 3,705.00
Rp 90,000.00 Rp 35,100.00
Rp 70,000.00 Rp 54,600.00
Rp 156,100.00 Rp 187,320.00
Rp 134,150.00 Rp 57,952.80
Jumlah Rp 342,577.80
Overhead + Profit ( 10 % ) Rp 34,257.78
Nilai HSPK : Rp 376,835.58
9
Struktur Utama
D Pekerjaan Beton
1 Pasang bekisting untuk sloof Bahan Kayu dipakai 2 kali m2
Tenaga:
Mandor 0.0260 O.H
Kepala Tukang Kayu 0.0260 O.H
Tukang Kayu 0.2600 O.H
Pekerja 0.5200 O.H
Bahan:
Kayu Meranti ( Kayu Kelas III ) 0.0225 m3
Paku biasa 2"-5" 0.3000 Kg
Minyak Bekesting 0.1000 Ltr
Jumlah
Overhead + Profit (
Nilai HSPK :
2 Pasang bekisting untuk kolom Bahan Kayu dipakai 2 kali m2
Tenaga:
Mandor 0.0330 O.H
Kepala Tukang Kayu 0.0330 O.H
Tukang Kayu 0.3300 O.H
Pekerja 0.6600 O.H
Bahan:
Kayu Meranti ( Kayu Kelas III ) 0.0200 m3
Paku biasa 2"-5" 0.4000 Kg
Minyak Bekesting 0.2000 Ltr
Glugu 0.0075 m3
Multipleks tebal 9 mm 0.1750 Lembar
Bambu 1.0000 Batang
Jumlah
Overhead + Profit (
Nilai HSPK :
3 Pasang bekisting untuk balok Bahan Kayu dipakai 2 kali m2
Tenaga:
Mandor 0.0330 O.H
Kepala Tukang Kayu 0.0330 O.H
Tukang Kayu 0.3300 O.H
Pekerja 0.6600 O.H
Bahan:
10
5 Pasang bekisting untuk kolom praktis, balok latai dan ring balk m2
Bahan Kayu dipakai 3 kali
Tenaga:
Mandor 0.0260 O.H
Kepala Tukang Kayu 0.0260 O.H
Tukang Kayu 0.2600 O.H
Pekerja 0.5200 O.H
Bahan:
Kayu Meranti ( Kayu Kelas III ) 0.0150 m3
Paku biasa 2"-5" 0.3000 Kg
Minyak Bekesting 0.1000 Ltr
Jumlah
Overhead + Profit (
Nilai HSPK :
6 Pembesian dengan besi polos Kg
Tenaga:
Mandor 0.0004 O.H
Kepala Tukang Besi 0.0007 O.H
Tukang Besi 0.0070 O.H
Pekerja 0.0070 O.H
Bahan:
Besi Beton Polos 1.0500 Kg
Kawat Beton 0.0150 Kg
Jumlah
Overhead + Profit (
Nilai HSPK :
17 Pembesian dengan besi Ulir Kg
Tenaga:
Mandor 0.0004 O.H
Kepala Tukang Besi 0.0007 O.H
Tukang Besi 0.0070 O.H
Pekerja 0.0070 O.H
Bahan:
Besi Beton Ulir 1.0500 Kg
Kawat Beton 0.0150 Kg
Jumlah
Overhead + Profit (
Nilai HSPK :
12
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 2,600.00
Rp 95,000.00 Rp 2,470.00
Rp 90,000.00 Rp 23,400.00
Rp 70,000.00 Rp 36,400.00
Rp 3,688,450.00 Rp 82,990.13
Rp 15,850.00 Rp 4,755.00
Rp 5,750.00 Rp 575.00
Jumlah Rp 153,190.13
Overhead + Profit ( 10 % ) Rp 15,319.01
Nilai HSPK : Rp 168,509.14
Rp 100,000.00 Rp 3,300.00
Rp 95,000.00 Rp 3,135.00
Rp 90,000.00 Rp 29,700.00
Rp 70,000.00 Rp 46,200.00
Rp 3,688,450.00 Rp 73,769.00
Rp 15,850.00 Rp 6,340.00
Rp 5,750.00 Rp 1,150.00
Rp 2,700,000.00 Rp 20,250.00
Rp 95,000.00 Rp 16,625.00
Rp 20,800.00 Rp 20,800.00
Jumlah Rp 221,269.00
Overhead + Profit ( 10 % ) Rp 22,126.90
Nilai HSPK : Rp 243,395.90
Rp 100,000.00 Rp 3,300.00
Rp 95,000.00 Rp 3,135.00
Rp 90,000.00 Rp 29,700.00
Rp 70,000.00 Rp 46,200.00
16
HARGA
HARGA
SATUAN
Rp 3,688,450.00 Rp 73,769.00
Rp 15,850.00 Rp 6,340.00
Rp 5,750.00 Rp 1,150.00
Rp 2,700,000.00 Rp 24,300.00
Rp 95,000.00 Rp 16,625.00
Rp 20,800.00 Rp 20,800.00
Jumlah Rp 225,319.00
Overhead + Profit ( 10 % ) Rp 22,531.90
Nilai HSPK : Rp 247,850.90
Rp 100,000.00 Rp 3,300.00
Rp 95,000.00 Rp 3,135.00
Rp 90,000.00 Rp 29,700.00
Rp 70,000.00 Rp 46,200.00
Rp 3,688,450.00 Rp 73,769.00
Rp 15,850.00 Rp 6,340.00
Rp 5,750.00 Rp 1,150.00
Rp 2,700,000.00 Rp 20,250.00
Rp 95,000.00 Rp 16,625.00
Rp 20,800.00 Rp 62,400.00
Jumlah Rp 262,869.00
Overhead + Profit ( 10 % ) Rp 26,286.90
Nilai HSPK : Rp 289,155.90
17
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 2,600.00
Rp 95,000.00 Rp 2,470.00
Rp 90,000.00 Rp 23,400.00
Rp 70,000.00 Rp 36,400.00
Rp 3,688,450.00 Rp 55,326.75
Rp 15,850.00 Rp 4,755.00
Rp 5,750.00 Rp 575.00
Jumlah Rp 125,526.75
Overhead + Profit ( 10 % ) Rp 12,552.68
Nilai HSPK : Rp 138,079.43
Rp 100,000.00 Rp 40.00
Rp 95,000.00 Rp 66.50
Rp 90,000.00 Rp 630.00
Rp 70,000.00 Rp 490.00
Rp 10,050.00 Rp 10,552.50
Rp 18,000.00 Rp 270.00
Jumlah Rp 12,049.00
Overhead + Profit ( 10 % ) Rp 1,204.90
Nilai HSPK : Rp 13,253.90
Rp 100,000.00 Rp 40.00
Rp 95,000.00 Rp 66.50
Rp 90,000.00 Rp 630.00
Rp 70,000.00 Rp 490.00
Rp 11,200.00 Rp 11,760.00
Rp 18,000.00 Rp 270.00
Jumlah Rp 13,256.50
Overhead + Profit ( 10 % ) Rp 1,325.65
Nilai HSPK : Rp 14,582.15
18
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 8,300.00
Rp 95,000.00 Rp 2,660.00
Rp 90,000.00 Rp 24,750.00
Rp 70,000.00 Rp 115,500.00
Rp 1,212.50 Rp 299,487.50
Rp 221.43 Rp 192,421.43
Rp 187.37 Rp 187,183.00
Rp 100.00 Rp 21,500.00
Jumlah Rp 851,801.93
Overhead + Profit ( 10 % ) Rp 85,180.19
Nilai HSPK : Rp 936,982.12
Rp 100,000.00 Rp 8,300.00
Rp 95,000.00 Rp 2,660.00
Rp 90,000.00 Rp 24,750.00
Rp 70,000.00 Rp 115,500.00
Rp 1,212.50 Rp 334,650.00
Rp 221.43 Rp 183,342.86
Rp 187.37 Rp 189,618.81
Rp 100.00 Rp 21,500.00
Jumlah Rp 880,321.67
Overhead + Profit ( 10 % ) Rp 88,032.17
Nilai HSPK : Rp 968,353.84
Rp 100,000.00 Rp 8,300.00
Rp 95,000.00 Rp 2,660.00
Rp 90,000.00 Rp 24,750.00
Rp 70,000.00 Rp 115,500.00
Rp 1,212.50 Rp 362,537.50
Rp 221.43 Rp 176,921.43
19
HARGA
HARGA
SATUAN
Rp 187.37 Rp 190,555.67
Rp 100.00 Rp 21,500.00
Jumlah Rp 902,724.60
Overhead + Profit ( 10 % ) Rp 90,272.46
Nilai HSPK : Rp 992,997.05
Rp 100,000.00 Rp 6,000.00
Rp 95,000.00 Rp 1,900.00
Rp 90,000.00 Rp 18,000.00
Rp 70,000.00 Rp 84,000.00
Rp 1,212.50 Rp 278,875.00
Rp 221.43 Rp 197,735.71
Rp 187.37 Rp 192,429.37
Rp 100.00 Rp 20,000.00
Jumlah Rp 798,940.08
Overhead + Profit ( 10 % ) Rp 79,894.01
Nilai HSPK : Rp 878,834.09
Rp 100,000.00 Rp 8,300.00
Rp 95,000.00 Rp 2,660.00
Rp 90,000.00 Rp 24,750.00
Rp 70,000.00 Rp 115,500.00
Rp 1,212.50 Rp 395,275.00
Rp 221.43 Rp 168,285.71
Rp 187.37 Rp 192,804.11
Rp 100.00 Rp 21,500.00
Jumlah Rp 929,074.83
Overhead + Profit ( 10 % ) Rp 92,907.48
Nilai HSPK : Rp 1,021,982.31
Rp 100,000.00 Rp 8,300.00
Rp 95,000.00 Rp 2,660.00
20
HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 24,750.00
Rp 70,000.00 Rp 115,500.00
Rp 1,212.50 Rp 449,837.50
Rp 221.43 Rp 154,557.14
Rp 187.37 Rp 196,176.78
Rp 100.00 Rp 21,500.00
Jumlah Rp 973,281.42
Overhead + Profit ( 10 % ) Rp 97,328.14
Nilai HSPK : Rp 1,070,609.56
- 24 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Pekerjaan Dinding dan Plesteran
F Pekerjaan Dinding dan Plesteran
1 Pemasangan Batu Merah tebal 1/2 bata (1 SP : 3 PP) m2
Tenaga:
Mandor 0.0150 O.H Rp 100,000.00
Kepala Tukang Batu 0.0100 O.H Rp 95,000.00
Tukang Batu 0.1000 O.H Rp 90,000.00
Pekerja 0.3000 O.H Rp 70,000.00
Bahan:
Semen portland 14.3700 kg Rp 1,212.50
Pasir Pasang 0.0400 m3 Rp 310,000.00
Bata Merah uk.5 x 11 x 22 70.00 Buah Rp 750.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
2 Pemasangan Batu Merah tebal 1 bata (1 SP : 5 PP) m2
Tenaga:
Mandor 0.0300 O.H Rp 100,000.00
Kepala Tukang Batu 0.0200 O.H Rp 95,000.00
Tukang Batu 0.2000 O.H Rp 90,000.00
Pekerja 0.6000 O.H Rp 70,000.00
Bahan:
Semen portland 22.2000 kg Rp 1,212.50
Pasir Pasang 0.1020 m3 Rp 310,000.00
Bata Merah uk.5 x 11 x 22 140.00 Buah Rp 750.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
3 Pemasangan Batu Merah tebal 1/2bata (1 SP : 5 PP) m2
Tenaga:
Mandor 0.0150 O.H Rp 100,000.00
Kepala Tukang Batu 0.0100 O.H Rp 95,000.00
Tukang Batu 0.1000 O.H Rp 90,000.00
Pekerja 0.3000 O.H Rp 70,000.00
Bahan:
Semen portland 9.6800 kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
- 25 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Bata Merah uk.5 x 11 x 22 70.0000 Buah Rp 750.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
4 Plesteran 1 SP : 5 PP tebal 15 mm m2
Tenaga:
Mandor 0.0150 O.H Rp 100,000.00
Kepala Tukang Batu 0.0150 O.H Rp 95,000.00
Tukang Batu 0.1500 O.H Rp 90,000.00
Pekerja 0.3000 O.H Rp 70,000.00
Bahan:
Semen portland 5.1840 kg Rp 1,212.50
Pasir Pasang 0.0260 m3 Rp 310,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 26 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
5 Plesteran Benangan Sudut m1
Tenaga:
Mandor 0.00350 O.H Rp 100,000.00
Kepala Tukang Batu 0.00350 O.H Rp 95,000.00
Tukang Batu 0.03500 O.H Rp 90,000.00
Pekerja 0.07000 O.H Rp 70,000.00
Bahan:
Semen portland 0.65000 kg Rp 1,212.50
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
6 Plesteran Ciprat 1 SP : 2 PP m2
Tenaga:
Mandor 0.0150 O.H Rp 100,000.00
Kepala Tukang Batu 0.0100 O.H Rp 95,000.00
Tukang Batu 0.1000 O.H Rp 90,000.00
Pekerja 0.3000 O.H Rp 70,000.00
Bahan:
Semen portland 4.3200 kg Rp 1,212.50
Pasir Pasang 0.0060 m3 Rp 310,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
7 Acian m2
Tenaga:
Mandor 0.0100 O.H Rp 100,000.00
Kepala Tukang Batu 0.0100 O.H Rp 95,000.00
Tukang Batu 0.1000 O.H Rp 90,000.00
Pekerja 0.2000 O.H Rp 70,000.00
Bahan:
Semen portland 3.2500 kg Rp 1,212.50
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 27 -
HARGA
Rp 1,500.00
Rp 950.00
Rp 9,000.00
Rp 21,000.00
Rp 17,423.63
Rp 12,400.00
Rp 52,500.00
Rp 114,773.63
Rp 11,477.36
Rp 126,250.99
Rp 3,000.00
Rp 1,900.00
Rp 18,000.00
Rp 42,000.00
Rp 26,917.50
Rp 31,620.00
Rp 105,000.00
Rp 228,437.50
Rp 22,843.75
Rp 251,281.25
Rp 1,500.00
Rp 950.00
Rp 9,000.00
Rp 21,000.00
Rp 11,737.00
Rp 13,950.00
- 28 -
HARGA
Rp 52,500.00
Rp 110,637.00
Rp 11,063.70
Rp 121,700.70
Rp 1,500.00
Rp 1,425.00
Rp 13,500.00
Rp 21,000.00
Rp 6,285.60
Rp 8,060.00
Rp 51,770.60
Rp 5,177.06
Rp 56,947.66
- 29 -
HARGA
Rp 350.00
Rp 332.50
Rp 3,150.00
Rp 4,900.00
Rp 788.13
Rp 9,520.63
Rp 952.06
Rp 10,472.69
Rp 1,500.00
Rp 950.00
Rp 9,000.00
Rp 21,000.00
Rp 5,238.00
Rp 1,860.00
Rp 39,548.00
Rp 3,954.80
Rp 43,502.80
Rp 1,000.00
Rp 950.00
Rp 9,000.00
Rp 14,000.00
Rp 3,940.63
Rp 28,890.63
Rp 2,889.06
Rp 31,779.69
- 30 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Pekerjaan Lantai
G Pekerjaan Lantai
1 Pasangan lantai keramik motif 20x20 cm m2
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
Semen portland 10.4000 Kg Rp 1,212.50
Semen Nat 0.5000 Kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
Keramik 20x20 cm setara ex. Asia tile 1.0500 doos Rp 55,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
2 Pasangan Dinding keramik 20x25 cm m2
Tenaga:
Mandor 0.0450 O.H Rp 100,000.00
Kepala Tukang Batu 0.0450 O.H Rp 95,000.00
Tukang Batu 0.4500 O.H Rp 90,000.00
Pekerja 0.0900 O.H Rp 70,000.00
Bahan:
Semen portland 9.3000 kg Rp 1,212.50
Semen Nat 1.9400 Kg Rp 1,212.50
Pasir Pasang 0.0180 m3 Rp 310,000.00
Keramik 20x25 cm setara ex. Asia tile 1.0600 m2 Rp 56,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
3 Pasangan lantai keramik Kasar 40x40 cm m2
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
- 31 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Semen portland 10.0000 kg Rp 1,212.50
Semen Nat 0.5000 Kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
Keramik Kasar 40x40 cm 1.0500 m2 Rp 60,450.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
14 Pasangan Dinding Batu Granit 30x60 cm Setara Ex. m2
Sumedang
Tenaga:
Mandor 0.0650 O.H Rp 100,000.00
Kepala Tukang Batu 0.0650 O.H Rp 95,000.00
Tukang Batu 0.6500 O.H Rp 90,000.00
Pekerja 1.3000 O.H Rp 70,000.00
Bahan:
Semen portland 12.4400 kg Rp 1,212.50
Pasir Pasang 0.0250 m3 Rp 310,000.00
Semen Nat 0.6500 kg Rp 1,212.50
Batu Granit 30x60 cm Setara Ex. Sumedang 1.0600 m2 Rp 250,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
15 Pasangan Dinding Batu Granit 40x60 cm Setara Ex. m2
Sumedang
Tenaga:
Mandor 0.0650 O.H Rp 100,000.00
Kepala Tukang Batu 0.0650 O.H Rp 95,000.00
Tukang Batu 0.6500 O.H Rp 90,000.00
Pekerja 1.3000 O.H Rp 70,000.00
Bahan:
Semen portland 12.4400 kg Rp 1,212.50
Pasir Pasang 0.0250 m3 Rp 310,000.00
Semen Nat 0.6500 Kg Rp 1,212.50
Batu Granit 40x60 cm Setara Ex. Sumedang 1.0600 m2 Rp 275,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 32 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
16 Pasangan Lantai Keramik Tipe Granit Motif Terang m2
60/60cm setara ex. Top Gress
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
Semen portland 9.8000 kg Rp 1,212.50
Semen Nat 1.3000 kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
Lantai Keramik Tipe Granit Motif Terang 1.0600 m2 Rp 125,000.00
60/60cm setara ex.Top Gress
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
17 Pasangan Lantai Keramik Tipe Granit Motif Gelap m2
60/60cm setara ex. Top Gress
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
Semen portland 9.8000 kg Rp 1,212.50
Semen Nat 1.3000 kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
Lantai Keramik Tipe Granit Motif Gelap 1.0600 m2 Rp 160,000.00
60/60cm setara ex.Top Gress
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
18 Pasangan Lantai Keramik Tipe Granit Motif Terang m2
60/60cm setara ex. Granito
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
- 33 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
Semen portland 9.8000 kg Rp 1,212.50
Semen Nat 1.3000 kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
Lantai Keramik Tipe Granit Motif Terang 1.0600 m2 Rp 230,500.00
60/60cm setara ex. Granito
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
19 Pasangan Lantai Keramik Tipe Granit Motif Gelap m2
60/60cm setara ex. Granito
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
Semen portland 9.8000 kg Rp 1,212.50
Semen Nat 1.3000 kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
Lantai Keramik Tipe Granit Motif Gelap 1.0600 m2 Rp 307,400.00
60/60cm setara ex. Granito
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
20 Pasangan Lantai Keramik Tipe Granit Motif Terang m2
60/60cm setara ex. Roman
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
Semen portland 9.8000 kg Rp 1,212.50
Semen Nat 1.3000 kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
- 34 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Lantai Keramik Tipe Granit Motif Terang 1.0600 m2 Rp 163,800.00
60/60cm setara ex. Roman
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
21 Pasangan Lantai Keramik Tipe Granit Motif Gelap m2
60/60cm setara ex. Roman
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
Semen portland 9.8000 kg Rp 1,212.50
Semen Nat 1.3000 kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
Lantai Keramik Tipe Granit Motif Gelap 1.0600 m2 Rp 238,800.00
60/60cm setara ex. Roman
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
22 Pasangan Dinding Keramik Tipe Granit Motif Terang m2
60/60cm setara ex. Top Gress
Tenaga:
Mandor 0.0450 O.H Rp 100,000.00
Kepala Tukang Batu 0.0450 O.H Rp 95,000.00
Tukang Batu 0.4500 O.H Rp 90,000.00
Pekerja 0.0900 O.H Rp 70,000.00
Bahan:
Semen portland 9.3000 kg Rp 1,212.50
Semen Nat 1.9400 kg Rp 1,212.50
Pasir Pasang 0.0180 m3 Rp 310,000.00
Dinding Keramik Tipe Granit Motif Terang 1.0600 m2 Rp 125,000.00
60/60cm setara ex.Top Gress
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 35 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
23 Pasangan Dinding Keramik Tipe Granit Motif Gelap m2
60/60cm setara ex. Top Gress
Tenaga:
Mandor 0.0450 O.H Rp 100,000.00
Kepala Tukang Batu 0.0450 O.H Rp 95,000.00
Tukang Batu 0.4500 O.H Rp 90,000.00
Pekerja 0.0900 O.H Rp 70,000.00
Bahan:
Semen portland 9.3000 kg Rp 1,212.50
Semen Nat 1.9400 kg Rp 1,212.50
Pasir Pasang 0.0180 m3 Rp 310,000.00
Dinding Keramik Tipe Granit Motif Gelap 1.0600 m2 Rp 160,000.00
60/60cm setara ex.Top Gress
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
24 Pasangan Dinding Keramik Tipe Granit Motif Terang m2
60/60cm setara ex. Granito
Tenaga:
Mandor 0.0450 O.H Rp 100,000.00
Kepala Tukang Batu 0.0450 O.H Rp 95,000.00
Tukang Batu 0.4500 O.H Rp 90,000.00
Pekerja 0.0900 O.H Rp 70,000.00
Bahan:
Semen portland 9.3000 kg Rp 1,212.50
Semen Nat 1.9400 kg Rp 1,212.50
Pasir Pasang 0.0180 m3 Rp 310,000.00
Dinding Keramik Tipe Granit Motif Terang 1.0600 m2 Rp 230,500.00
60/60cm setara ex. Granito
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
25 Pasangan Dinding Keramik Tipe Granit Motif Gelap m2
60/60cm setara ex. Granito
Tenaga:
Mandor 0.0450 O.H Rp 100,000.00
Kepala Tukang Batu 0.0450 O.H Rp 95,000.00
Tukang Batu 0.4500 O.H Rp 90,000.00
- 36 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Pekerja 0.0900 O.H Rp 70,000.00
Bahan:
Semen portland 9.3000 kg Rp 1,212.50
Semen Nat 1.9400 kg Rp 1,212.50
Pasir Pasang 0.0180 m3 Rp 310,000.00
Dinding Keramik Tipe Granit Motif Gelap 1.0600 m2 Rp 307,400.00
60/60cm setara ex. Granito
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
26 Pasangan Dinding Keramik Tipe Granit Motif Terang m2
60/60cm setara ex. Roman
Tenaga:
Mandor 0.0450 O.H Rp 100,000.00
Kepala Tukang Batu 0.0450 O.H Rp 95,000.00
Tukang Batu 0.4500 O.H Rp 90,000.00
Pekerja 0.0900 O.H Rp 70,000.00
Bahan:
Semen portland 9.3000 kg Rp 1,212.50
Semen Nat 1.9400 kg Rp 1,212.50
Pasir Pasang 0.0180 m3 Rp 310,000.00
Dinding Keramik Tipe Granit Motif Terang 1.0600 m2 Rp 163,800.00
60/60cm setara ex. Roman
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
27 Pasangan Dinding Keramik Tipe Granit Motif Gelap m2
60/60cm setara ex. Roman
Tenaga:
Mandor 0.0450 O.H Rp 100,000.00
Kepala Tukang Batu 0.0450 O.H Rp 95,000.00
Tukang Batu 0.4500 O.H Rp 90,000.00
Pekerja 0.0900 O.H Rp 70,000.00
Bahan:
Semen portland 9.3000 kg Rp 1,212.50
Semen Nat 1.9400 kg Rp 1,212.50
Pasir Pasang 0.0180 m3 Rp 310,000.00
- 37 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Dinding Keramik Tipe Granit Motif Gelap 1.0600 m2 Rp 238,800.00
60/60cm setara ex. Roman
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 38 -
HARGA
Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 4,900.00
Rp 12,610.00
Rp 606.25
Rp 13,950.00
Rp 57,750.00
Rp 128,141.25
Rp 12,814.13
Rp 140,955.38
Rp 4,500.00
Rp 4,275.00
Rp 40,500.00
Rp 6,300.00
Rp 11,276.25
Rp 2,352.25
Rp 5,580.00
Rp 59,360.00
Rp 134,143.50
Rp 13,414.35
Rp 147,557.85
Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 4,900.00
- 39 -
HARGA
Rp 12,125.00
Rp 606.25
Rp 13,950.00
Rp 63,472.50
Rp 133,378.75
Rp 13,337.88
Rp 146,716.63
Rp 6,500.00
Rp 6,175.00
Rp 58,500.00
Rp 91,000.00
Rp 15,083.50
Rp 7,750.00
Rp 788.13
Rp 265,000.00
Rp 450,796.63
Rp 45,079.66
Rp 495,876.29
Rp 6,500.00
Rp 6,175.00
Rp 58,500.00
Rp 91,000.00
Rp 15,083.50
Rp 7,750.00
Rp 788.13
Rp 291,500.00
Rp 477,296.63
Rp 47,729.66
Rp 525,026.29
- 40 -
HARGA
Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 4,900.00
Rp 11,882.50
Rp 1,576.25
Rp 13,950.00
Rp 132,500.00
Rp 203,133.75
Rp 20,313.38
Rp 223,447.13
Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 4,900.00
Rp 11,882.50
Rp 1,576.25
Rp 13,950.00
Rp 169,600.00
Rp 240,233.75
Rp 24,023.38
Rp 264,257.13
Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
- 41 -
HARGA
Rp 4,900.00
Rp 11,882.50
Rp 1,576.25
Rp 13,950.00
Rp 244,330.00
Rp 314,963.75
Rp 31,496.38
Rp 346,460.13
Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 4,900.00
Rp 11,882.50
Rp 1,576.25
Rp 13,950.00
Rp 325,844.00
Rp 396,477.75
Rp 39,647.78
Rp 436,125.53
Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 4,900.00
Rp 11,882.50
Rp 1,576.25
Rp 13,950.00
- 42 -
HARGA
Rp 173,628.00
Rp 244,261.75
Rp 24,426.18
Rp 268,687.93
Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 4,900.00
Rp 11,882.50
Rp 1,576.25
Rp 13,950.00
Rp 253,128.00
Rp 323,761.75
Rp 32,376.18
Rp 356,137.93
Rp 4,500.00
Rp 4,275.00
Rp 40,500.00
Rp 6,300.00
Rp 11,276.25
Rp 2,352.25
Rp 5,580.00
Rp 132,500.00
Rp 207,283.50
Rp 20,728.35
Rp 228,011.85
- 43 -
HARGA
Rp 4,500.00
Rp 4,275.00
Rp 40,500.00
Rp 6,300.00
Rp 11,276.25
Rp 2,352.25
Rp 5,580.00
Rp 169,600.00
Rp 244,383.50
Rp 24,438.35
Rp 268,821.85
Rp 4,500.00
Rp 4,275.00
Rp 40,500.00
Rp 6,300.00
Rp 11,276.25
Rp 2,352.25
Rp 5,580.00
Rp 244,330.00
Rp 319,113.50
Rp 31,911.35
Rp 351,024.85
Rp 4,500.00
Rp 4,275.00
Rp 40,500.00
- 44 -
HARGA
Rp 6,300.00
Rp 11,276.25
Rp 2,352.25
Rp 5,580.00
Rp 325,844.00
Rp 400,627.50
Rp 40,062.75
Rp 440,690.25
Rp 4,500.00
Rp 4,275.00
Rp 40,500.00
Rp 6,300.00
Rp 11,276.25
Rp 2,352.25
Rp 5,580.00
Rp 173,628.00
Rp 248,411.50
Rp 24,841.15
Rp 273,252.65
Rp 4,500.00
Rp 4,275.00
Rp 40,500.00
Rp 6,300.00
Rp 11,276.25
Rp 2,352.25
Rp 5,580.00
- 45 -
HARGA
Rp 253,128.00
Rp 327,911.50
Rp 32,791.15
Rp 360,702.65
- 37 -
Pekerjaan Atap
H Pekerjaaan Rangka Atap
1 Pasang rangka atap baja ringan profil C75 Setara Ex. Kencana m2
Tenaga:
Mandor 0.0185 O.H
Kepala Tukang Besi 0.0365 O.H
Tukang Besi 0.3670 O.H
Pekerja 0.3670 O.H
Bahan:
Baja Ringan C75 - 0.75mm Setara Ex. Kencana 7.5000 m1
Baja Ringan Reng TS 40.045 Setara Ex. Kencana 4.2900 m1
Baut 17.5000 buah
Dinabolt 0.5600 buah
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
I Penutup Atap
1 Pasang Atap Genteng Karang Pilang Type Italy ( Kodokan ) m2
Tenaga:
Mandor 0.0080 O.H
Kepala Tukang Kayu 0.0080 O.H
Tukang Kayu 0.0750 O.H
Pekerja 0.1500 O.H
Bahan:
Genteng Karang Pilang Type Italy 25.0000 Biji
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
2 Pasang genteng Wuwung ex.Karangpilang m1
Tenaga:
Mandor 0.0200 O.H
Kepala Tukang Kayu 0.0200 O.H
Tukang Kayu 0.2000 O.H
Pekerja 0.4000 O.H
Bahan:
Semen 8.0000 kg
Pasir Pasang 0.0320 m3
- 38 -
J Plafon
1 Pasang rangka langit - langit (0.5x1)m kayu jati m2
Tenaga:
Mandor 0.0750 O.H
Kepala Tukang Kayu 0.0300 O.H
Tukang Kayu 0.3000 O.H
Pekerja 0.1500 O.H
Bahan:
Jati Kaso 5 x 7 x 400 cm 0.0154 m3
Paku biasa 2"-5" 0.2000 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
2 Pasang rangka langit - langit (0.5x1)m kayu kamper m2
Tenaga:
Mandor 0.0750 O.H
Kepala Tukang Kayu 0.0300 O.H
Tukang Kayu 0.3000 O.H
Pekerja 0.1500 O.H
Bahan:
Kamper Kaso 5 x 7 x 400 cm 0.0154 m3
Paku Biasa 0.2000 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
3 Pasang rangka langit - langit (0.5x1)m kayu kruing m2
Tenaga:
Mandor 0.0750 O.H
Kepala Tukang Kayu 0.0300 O.H
Tukang Kayu 0.3000 O.H
Pekerja 0.1500 O.H
Bahan:
Kruing Kaso 5 x 7 x 400 cm 0.0154 m3
Paku Biasa 0.2000 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
- 40 -
Tenaga:
Mandor 0.0040 O.H
Kepala Tukang Kayu 0.0070 O.H
Tukang Kayu 0.0700 O.H
Pekerja 0.0300 O.H
Bahan:
Asbes Datar 100 x 100 x 0.3 1.1000 Lembar
Paku Asbes 0.0100 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
8 Langit - langit Teakwood uk. 120x240, tebal 4 mm m2
Tenaga:
Mandor 0.0050 O.H
Kepala Tukang Kayu 0.0100 O.H
Tukang Kayu 0.1000 O.H
Pekerja 0.1000 O.H
Bahan:
Teakwood 120x 240 0.3750 Lembar
Paku Triplek 0.0300 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
9 List langit - langit kayu kamper m1
Tenaga:
Mandor 0.0030 O.H
Kepala Tukang Kayu 0.0050 O.H
Tukang Kayu 0.0500 O.H
Pekerja 0.0500 O.H
Bahan:
Kamper Kaso 5 x 7 x 400 cm 0.0010 m3
Paku Biasa 0.0100 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
10 Langit-langit gypsum board, tebal 9 mm m2
Tenaga:
- 42 -
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 1,850.00
Rp 95,000.00 Rp 3,467.50
Rp 90,000.00 Rp 33,030.00
Rp 70,000.00 Rp 25,690.00
Rp 14,000.00 Rp 105,000.00
Rp 5,666.67 Rp 24,310.00
Rp 250.00 Rp 4,375.00
Rp 2,000.00 Rp 1,120.00
mlah Rp 198,842.50
verhead + Profit ( 10 % ) Rp 19,884.25
lai HSPK : Rp 218,726.75
Rp 100,000.00 Rp 800.00
Rp 95,000.00 Rp 760.00
Rp 90,000.00 Rp 6,750.00
Rp 70,000.00 Rp 10,500.00
Rp 4,750.00 Rp 118,750.00
mlah Rp 137,560.00
verhead + Profit ( 10 % ) Rp 13,756.00
lai HSPK : Rp 151,316.00
Rp 100,000.00 Rp 2,000.00
Rp 95,000.00 Rp 1,900.00
Rp 90,000.00 Rp 18,000.00
Rp 70,000.00 Rp 28,000.00
Rp 1,212.50 Rp 9,700.00
Rp 310,000.00 Rp 9,920.00
- 45 -
HARGA
HARGA
SATUAN
Rp 14,500.00 Rp 72,500.00
mlah Rp 142,020.00
verhead + Profit ( 10 % ) Rp 14,202.00
lai HSPK : Rp 156,222.00
- 46 -
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 7,500.00
Rp 95,000.00 Rp 2,850.00
Rp 90,000.00 Rp 27,000.00
Rp 70,000.00 Rp 10,500.00
Rp 8,570,000.00 Rp 131,978.00
Rp 15,850.00 Rp 3,170.00
mlah Rp 182,998.00
verhead + Profit ( 10 % ) Rp 18,299.80
lai HSPK : Rp 201,297.80
Rp 100,000.00 Rp 7,500.00
Rp 95,000.00 Rp 2,850.00
Rp 90,000.00 Rp 27,000.00
Rp 70,000.00 Rp 10,500.00
Rp 7,855,000.00 Rp 120,967.00
Rp 15,850.00 Rp 3,170.00
mlah Rp 171,987.00
verhead + Profit ( 10 % ) Rp 17,198.70
lai HSPK : Rp 189,185.70
Rp 100,000.00 Rp 7,500.00
Rp 95,000.00 Rp 2,850.00
Rp 90,000.00 Rp 27,000.00
Rp 70,000.00 Rp 10,500.00
Rp 6,849,900.00 Rp 105,488.46
Rp 15,850.00 Rp 3,170.00
mlah Rp 156,508.46
verhead + Profit ( 10 % ) Rp 15,650.85
lai HSPK : Rp 172,159.31
- 47 -
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 1,000.00
Rp 95,000.00 Rp 2,850.00
Rp 90,000.00 Rp 27,000.00
Rp 70,000.00 Rp 14,000.00
Rp 8,570,000.00 Rp 139,691.00
Rp 15,850.00 Rp 3,962.50
mlah Rp 188,503.50
verhead + Profit ( 10 % ) Rp 18,850.35
lai HSPK : Rp 207,353.85
Rp 100,000.00 Rp 1,000.00
Rp 95,000.00 Rp 2,850.00
Rp 90,000.00 Rp 27,000.00
Rp 70,000.00 Rp 14,000.00
Rp 7,855,000.00 Rp 128,036.50
Rp 15,850.00 Rp 3,962.50
mlah Rp 176,849.00
verhead + Profit ( 10 % ) Rp 17,684.90
lai HSPK : Rp 194,533.90
Rp 100,000.00 Rp 1,000.00
Rp 95,000.00 Rp 2,850.00
Rp 90,000.00 Rp 27,000.00
Rp 70,000.00 Rp 14,000.00
Rp 6,849,900.00 Rp 111,653.37
Rp 15,850.00 Rp 3,962.50
mlah Rp 160,465.87
verhead + Profit ( 10 % ) Rp 16,046.59
lai HSPK : Rp 176,512.46
- 48 -
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 400.00
Rp 95,000.00 Rp 665.00
Rp 90,000.00 Rp 6,300.00
Rp 70,000.00 Rp 2,100.00
Rp 17,500.00 Rp 19,250.00
Rp 22,150.00 Rp 221.50
mlah Rp 28,936.50
verhead + Profit ( 10 % ) Rp 2,893.65
lai HSPK : Rp 31,830.15
Rp 100,000.00 Rp 500.00
Rp 95,000.00 Rp 950.00
Rp 90,000.00 Rp 9,000.00
Rp 70,000.00 Rp 7,000.00
Rp 132,800.00 Rp 49,800.00
Rp 19,000.00 Rp 570.00
mlah Rp 67,820.00
verhead + Profit ( 10 % ) Rp 6,782.00
lai HSPK : Rp 74,602.00
Rp 100,000.00 Rp 300.00
Rp 95,000.00 Rp 475.00
Rp 90,000.00 Rp 4,500.00
Rp 70,000.00 Rp 3,500.00
Rp 7,855,000.00 Rp 7,855.00
Rp 15,850.00 Rp 158.50
mlah Rp 16,788.50
verhead + Profit ( 10 % ) Rp 1,678.85
lai HSPK : Rp 18,467.35
- 49 -
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 500.00
Rp 95,000.00 Rp 475.00
Rp 90,000.00 Rp 4,500.00
Rp 70,000.00 Rp 7,000.00
Rp 70,000.00 Rp 25,480.00
Rp 350.00 Rp 3,850.00
mlah Rp 41,805.00
verhead + Profit ( 10 % ) Rp 4,180.50
lai HSPK : Rp 45,985.50
Rp 100,000.00 Rp 300.00
Rp 95,000.00 Rp 475.00
Rp 90,000.00 Rp 4,500.00
Rp 70,000.00 Rp 3,500.00
Rp 18,150.00 Rp 19,057.50
Rp 4,250.00 Rp 637.50
mlah Rp 28,470.00
verhead + Profit ( 10 % ) Rp 2,847.00
lai HSPK : Rp 31,317.00
Rp 100,000.00 Rp 500.00
Rp 95,000.00 Rp 475.00
Rp 90,000.00 Rp 4,500.00
Rp 70,000.00 Rp 7,000.00
Rp 54,400.00 Rp 19,801.60
Rp 350.00 Rp 3,850.00
mlah Rp 36,126.60
verhead + Profit ( 10 % ) Rp 3,612.66
lai HSPK : Rp 39,739.26
Rp 100,000.00 Rp 500.00
- 50 -
HARGA
HARGA
SATUAN
Rp 95,000.00 Rp 475.00
Rp 90,000.00 Rp 4,500.00
Rp 70,000.00 Rp 7,000.00
Rp 95,000.00 Rp 34,580.00
Rp 350.00 Rp 3,850.00
mlah Rp 50,905.00
verhead + Profit ( 10 % ) Rp 5,090.50
lai HSPK : Rp 55,995.50
Rp 100,000.00 Rp 1,800.00
Rp 95,000.00 Rp 3,325.00
Rp 90,000.00 Rp 31,500.00
Rp 70,000.00 Rp 24,500.00
Rp 4,216.67 Rp 11,222.38
Rp 5,625.00 Rp 13,535.35
Rp 24,757.74 Rp 24,757.74
mlah Rp 110,640.47
verhead + Profit ( 10 % ) Rp 11,064.05
lai HSPK : Rp 121,704.52
Rp 100,000.00 Rp 150.00
Rp 95,000.00 Rp 142.50
Rp 90,000.00 Rp 1,350.00
Rp 70,000.00 Rp 2,100.00
Rp 72,500.00 Rp 38,062.50
Rp 350.00 Rp 2,100.00
mlah Rp 43,905.00
verhead + Profit ( 10 % ) Rp 4,390.50
lai HSPK : Rp 48,295.50
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
1 3 4 5
BAHAN BANGUNAN DAN KONSTRUKSI
Aspal
1 Aspal Aspal Bitumen Kg
2 Aspal Aspal Curah (AC 60/70) Kg
3 Aspal Buton Granular Kg
4 Aspal Chemecrete Kg
5 Aspal Pengikat (Tack Coat) ltr
6 Aspal resap pengikat ( prime coat ) ltr
7 Filler ltr
8 Aspal Curah Kemasan Drum Kg
9 Asbuton Halus Ton
Semen
1 Semen Gresik 40 Kg zak 46,000
2 Semen Gresik 50 Kg zak 55,000
3 Semen Holcim, 40 Kg zak 41,500
4 Semen Holcim, 50 Kg zak 54,500
5 Semen Semen warna/nat Kg 14,200
Beton Ready Mixed
1 Beton Ready Mixed K-125 m3 760,000
2 Beton Ready Mixed K-150 m3 780,000
3 Beton Ready Mixed K-175 m3 800,000
4 Beton Ready Mixed K-225 m3 820,000
5 Beton Ready Mixed K-250 m3 850,000
6 Beton Ready Mixed K-300 m3 900,000
7 Beton Ready Mixed K-350 m3 950,000
8 Beton Ready Mixed K-400 m3 1,000,000
9 Beton Ready Mixed K-500 m3 1,060,000
Kaca
1 Kaca Fiber glas 92 cm m2 36,800
2 Kaca Krepyak Nako daun 17,850
3 Kaca Polos Bening 8 mm m2 161,000
4 Kaca Polos Bening 10 mm m2 230,600
5 Kaca Polos Bening 12 mm m2 312,850
6 Kaca Polos Bening tebal 3mm m2 92,500
7 Kaca Polos Bening tebal 5mm m2 123,300
8 Kaca Rayben tebal 3mm m2 97,500
9 Kaca Rayben tebal 5mm m2 123,750
10 Kaca Kaca Es Tebal 5mm m2 106,850
11 Kaca Vertical Blind m2 151,050
12 Kaca Acrylic, bening uk. 5mm ( 122 x 244 cm ) buah 1,189,900
13 Kaca Acrylic, bening uk. 10mm ( 122 x 244 cm ) buah 2,172,900
14 Kaca Kaca Tempered Tebal 8 mm m2 655,000
15 Kaca Kaca Tempered Tebal 10 mm m2 750,000
16 Kaca Kaca Tempered Tebal 12 mm m2 825,000
Pasir
1 Pasir Beton m3 300,000
2 Pasir Pasang m3 300,000
3 Pasir Sirtu m3 175,000
4 Pasir Tanah Urug /Padas/Tanah Liat m3 70,000
5 Pasir Urug m3 134,250
6 Tanah Tanam m3 90,000
51
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
Batu
1 Batu Ampyang Multi warna m2 81,400
2 Batu Bata Merah Biji 700
3 Batu Batako Semen (40x 20x 10 cm) Buah 6,000
4 Batu Candi Alur m2 143,750
5 Batu Gilang Ex Cirebon Acak m2 103,500
6 Batu Gilang Ex Cirebon Uk. 10 x 20 m2 115,800
7 Batu Gilang Ex Jember Acak m2 98,300
8 Batu Gilang Ex Jember 20x40 m2 96,100
9 Batu Grass Block Buah 21,800
10 Batu Looster, abu-abu Biji 9,900
11 Batu Looster, Merah Biji 8,000
12 Batu Palimanan Hijau m2 136,600
13 Batu Palimanan Kuning m2 141,700
14 Batu Pecah Mesin 0,5/1 cm m3 250,000
15 Batu Pecah Mesin 1/2 cm m3 262,900
16 Batu Pecah Mesin 2/3 cm m3 252,950
17 Batu Pecah Tangan 15/20 m3 139,850
18 Batu Pecah Tangan 3/5 cm m3 236,200
19 Batu Pecah Tangan 5/7 cm m3 175,000
Cat
1 Cat Avian Kg 25,200
2 Cat Bron Kg 39,800
3 Cat Cat Mobil Liter 121,000
4 Cat Cerlak galon 208,600
5 Cat Clear Doof Kg 50,600
6 Cat Coumpond isi 1 Kg Kaleng 35,100
7 Cat Dempul Kayu, Pedang Kg 25,400
8 Cat Dempul Kayu, Bakar Buah 3,300
9 Cat Dempul Mobil Kg 41,700
10 Cat Dempul Mobil Classy Kg 41,700
11 Cat Duco Gram 60,000
12 Cat Genteng, Sanlek Galon 185,750
13 Cat Kayu / Emco Kg 61,550
14 Cat Besi/emco Kg 60,650
15 Cat Meni Besi, Pedang Kg 28,200
16 Cat Minyak Cat, Avian Liter 28,000
17 Cat Minyak Cat, Biasa Liter 11,700
18 Cat Pewarna Cat Tembak Kg 58,950
19 Cat Plamur Kayu, Cap Pedang Kg 27,000
20 Cat Plamur Tembok Kg 36,000
21 Cat Politur jadi Liter 40,500
22 Residu Liter 4,600
23 Cat Shanding Kg 53,150
24 Cat Teer Kg 14,400
25 Cat Catylac 5Kg 110,750
26 Cat Tembok Decholite (5 Kg) Galon 99,600
27 Cat Tembok Interior Dulux Khusus Liter 55,900
28 Cat Tembok Interior Dulux standar Liter 57,000
29 Cat Thinner A Special Liter 27,300
30 Cat Thinner B Liter 12,000
31 Cat Wood Filler Kg 39,400
32 Cat Tembok Eksterior Dulux ( Standar ) Liter 89,000
33 Cat Tembok Eksterior Dulux ( Khusus ) Liter 96,100
52
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
53
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
Waterproofing
1 Waterproofing No Drop, 1 Kg Kaleng 49,500
2 Waterproofing No Drop, 4 Kg Kaleng 190,000
3 Waterproofing No Drop, 20 Kg Kaleng 861,450
Seng
1 Seng Gelombang BJLS 20 uk. (80 x 300 cm) Lembar 82,300
2 Seng Gelombang BJLS 28 uk. (80 x 180 cm) Lembar 53,100
3 Seng Gelombang BJLS 30 uk. (80 x 210 cm) Lembar 54,000
4 Seng Gelombang BJLS 30 uk. (80x 300cm) Lembar 77,000
5 Seng Gelombang BJLS 30 uk. (80x 180cm) Lembar 46,250
6 Seng Gelombang BJLS 40 uk. (80 cm x300 cm) Lembar 139,700
7 Seng Gelombang BJLS 40 uk. (80 cm x210 cm) Lembar 103,500
8 Seng Gelombang BJLS 40 uk (80 x 240 cm) Lembar 113,800
9 Seng Gelombang Nok Stel Gelombang Seng Stel 26,500
10 Seng Gelombang Plat BJLS 30/30 cm m1 17,300
11 Seng Gelombang Plat BJLS 30/40 cm m1 20,900
12 Seng Gelombang Plat BJLS 30/80 cm m1 38,000
13 Seng Gelombang Plat uk (0,03x90x180)cm Lembar 65,700
14 Seng Gelombang Sambungan talang Buah 8,700
15 Seng Gelombang Talang 60cm x 30 BJLS m1 18,000
16 Seng Gelombang Talang 60cm x 40 BJLS m1 41,800
17 Seng Gelombang Talang 90cm x 30 BJLS m1 29,000
18 Seng Gelombang Talang 90cm x 40 BJLS m1 46,500
Atap Spandek
1 Atap Spandek tebal 0,3 lebar 75 cm m1 33,000
2 Atap Spandek tebal 0,35 lebar 75 cm m1 44,000
3 Atap Spandek tebal 0,4 lebar 75 cm m1 49,000
4 Atap Spandek tebal 0,45 lebar 75 cm m1 72,900
5 Atap Spandek tebal 0,5 lebar 75 cm m1 77,000
Baja
1 Baja Baja WF Kg 13,000
2 Baja Plat esser 0.12x120x 240 cm m2 110,000
3 Baja Plat esser 0.3x120 x 240 cm m2 242,250
4 Baja Plat Eyser 0,09 m2 145,450
5 Baja Plat Eyser 0,2 m2 201,400
6 Baja Plat Eyser 0,3 m2 272,450
7 Baja Plat Siku Kg 12,500
8 Baja Plat Strip Kg 12,500
9 Baja Plate Bronze Kg 29,100
10 Baja Rangka Galvalume & Accessories m2 212,950
11 Baja Ringan Zincalum, C75 - 0.75mm btg 79,000
12 Baja Ringan Zincalum, Reng TS 40.048 btg 33,000
13 Baja Ringan UK75 - 0.75mm btg 151,500
14 Baja Kanal C kg 12,500
Besi
1 Besi Beton, polos Kg 9,500
2 Besi Beton, Ulir Kg 10,600
3 Besi Angkur 30 x 30 x 3 mm Meter 18,100
4 Hollow 4 x 4, panjang 6 m ( Galvalume ) Batang 27,000
5 Hollow 2 x 4, panjang 6 m ( Galvalume ) Batang 20,250
6 Pipa Besi Hollow 3 x 3, panjang 6 m Batang 86,000
7 Pipa Besi Hollow 2 x 4, panjang 6 m Batang 86,000
8 Pipa Besi Hollow 4 x 4, panjang 6 m Batang 109,650
9 Pipa Besi Hollow 5 x 5, panjang 6 m Batang 147,000
54
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
55
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
56
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
Amplas
1 Amplas Halus Feting 0 s/d 3 Buah 5,000
2 Amplas Kasar Fujistar 0 s/d 1000 Buah 4,900
Asbes
1 Asbes Gel Besar Tbl 6 mm; 1.80x1.05 m Lembar 51,000
2 Asbes Gel Besar Tbl 4 mm ; 3 x 1.05 m Lembar 65,000
3 Asbes Gel Besar Tbl 5 mm ; 3 x 1.10 m Lembar 67,000
4 Asbes Gel Besar Tbl 6 mm; 2.10x1.05 m Lembar 37,000
5 Asbes Gel Besar Tbl 6 mm; 2.40x1.05 m Lembar 42,000
6 Asbes Gel Kecil Tbl 4 mm; 1.80x1.05 m Lembar 50,000
7 Asbes Gel Kecil Tbl 4 mm; 2.10x1.05 m Lembar 58,000
8 Asbes Gel Kecil Tbl 4 mm; 2.40x1.05 m Lembar 68,000
9 Asbes Gel Kecil Tbl 4 mm; 2.70x1.05 m Lembar 80,500
10 Asbes Gel Kecil Tbl 4 mm; 3.00x1.05 m Lembar 74,100
11 Asbes Gel Kecil Tbl 5 mm; 3.05x1.05 m Lembar 85,100
12 Asbes Datar uk. 100 x 100 x 0.3Cm Lembar 20,000
13 Asbes Gel. Besar Tbl 5 mm ; 2.5 x 1.10 Lembar 106,200
14 Asbes Gel. Kecil Tbl 4 mm ; 1.5 x 1.05 Lembar 53,100
15 Asbes Gel. Kecil Tbl 5 mm ; 2.00 x 0.92 Lembar 73,900
16 Asbes Sirap Uk. 20x3x400 cm Lembar 25,650
17 Asbes Nok Nok Asbes Gel. Besar Lembar 50,000
18 Asbes Nok Nok Asbes Gel. Kecil Lembar 33,000
Bahan Las
1 Bahan Las Elektroda Baja Kg 67150
2 Bahan Las Kawat Las 2.6 mm Kg 33600
Closet
1 Closet Ina, Duduk Komplit [2 Kran] Set 1,459,900
2 Closet Jongkok porselin Buah 152,800
3 Closet Jongkok teraso Buah 98,800
4 Closet Toto, Lengkap Set 2,200,000
Hand Shower
1 Hand Shower Shower (Stainless) Buah 108,550
Wastafel
1 Wastafel duty blue/white Buah 191,700
2 Wastafel Ina, Bahan Keramik Buah 352,400
3 Wastafel Toto Buah 546,200
4 Wastafel Urinoir Merk. Toto Buah 931,200
Bak Cuci Piring
1 Bak Cuci Piring Bak Cuci Piring 100 Cm Afur Besar Buah 700,900
2 Bak Cuci Piring Bak Cuci Piring 100 Cm Afur Kecil Buah 357,300
3 Bak Cuci Piring Bak Cuci Piring 80 Cm Afur Besar Buah 595,600
4 Bak Cuci Piring Kenny, Stainless 90x50x14 cm+Afur Buah 201,650
Tempat Sabun
1 Tempat Sabun Duty oval maron/sorento/tosca Buah 410,700
2 Tempat Sabun Duty kotak maron/sorento/tosca Buah 35,000
3 Tempat Sabun Duty oval blue/green Buah 347,100
4 Tempat Sabun Duty oval maron/ sorento/ tosca Buah 410,700
Karpet
1 Wall Paper Buaya, lebar 55 cm m2 11,000
Penutup Lantai
1 Granit Batu Granit, 30 x 60 m2 466,300
2 Granit Batu Granit, 40 x 60 m2 524,600
57
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
58
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
Sekrup
1 Sekrup 2" Buah 300
59
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
PolyCarbonate
2 PolyCarbonate L. 2,1 m P. 11,8 m t.5 mm m2 109,350
Gypsum
1 Gypsum board Tebal 12 mm Lembar 93,300
2 Gypsum board Tebal 9 mm Lembar 61,600
3 List Gypsum profil m 17,200
Kalsiboard
1 Kalsiboard Uk. 244 x 122 x 3,5 mm Lembar 51,600
2 Kalsiboard Uk. 244 x 122 x 4,5 mm Lembar 60,000
3 Kalsiboard Uk. 244 x 122 x 6 mm Lembar 118,300
4 Kalsiplank lbr = 20 cm Lembar 46,400
5 Kalsiplank lbr = 30 cm Lembar 68,950
6 Lisplank GRC m2 315,000
Got Talang
1 Got Talang R.10 (1/2 lingkaran) Buah 12,400
2 Got Talang R.10 (segmen) Buah 13,500
3 Got Talang R.15 (1/2 lingkaran) Buah 16,000
4 Got Talang R.15 (segmen) Buah 16,800
5 Got Talang R.25 (1/2 lingkaran) Buah 24,300
6 Got Talang R.25 (segmen) Buah 27,100
Paving Stone
1 Kanstin Uk. 40 x18 x 10 cm bh 10,100
2 Kanstin Uk. 50 x 35 x 15 cm bh 28,200
3 Kanstin Uk. 10 x 20 x 40 cm ex. Focon m1 64,090
4 Kanstin Uk. 15/20 x 30 x 50 cm ex. Focon m1 105,272
5 Paving block Abu. Uk. 11,5 x 22,5 x 6 cm ex. Conblock m2 103,100
6 Paving block Abu. Uk. 11,5 x 22,5 x 8 cm ex. Conblock m2 119,700
7 Paving block Hijau. Uk. 11,5 x 22,5 x 6 cm ex. Conblock m2 131,300
8 Paving block Hijau. Uk. 11,5 x 22,5 x 8 cm ex. Conblock m2 150,700
9 Grass Block Tebal 6 Buah 18,600
10 Grass Block uk. 21.5 x 42 cm, Tebal 10 m2 103,500
11 Paving Stone Tebal 6cm Kw 1,abu-abu m2 60,700
12 Paving Stone Tebal 8cm Kw 1, abu-abu m2 75,900
13 Paving block uk. 21.21.6 Abu-abu / corso K 300 ex. Focon m2 88,000
14 Paving block uk. 21.21.8 Abu-abu / corso K 300 ex. Focon m2 105,000
15 Paving block uk. 21.21.6 Merah / corso K 300 ex. Focon m2 108,000
16 Paving block uk. 21.21.8 Merah / corso K 300 ex. Focon m2 130,000
17 Grass Block tebal 10 cm ex. Focon m2 130,000
18 Paving block uk. 10.5.21.6 Abu-abu K 300 ex. Focon m2 76,500
19 Paving block uk. 10.5.21.6 Merah K 300 ex. Focon m2 96,500
20 Paving block uk. 10.5.21.8 Abu-abu K 300 ex. Focon m2 101,500
21 Paving block uk. 10.5.21.8 Merah K 300 ex. Focon m2 126,500
Kawat
1 Kawat Kawat Beton Kg 19,300
Kayu dan Bambu
1 Bambu Pring Dia 10-12 cm x 4 m Batang 20,000
2 Kayu Bekesting (meranti) m3 3,564,050
3 Kayu Glugu Balok 8 x 10 x 300 cm Batang 3,000,000
4 Kayu Jati Balok 6 x 12 x 400cm m3 ###
5 Kayu Jati Balok 8 x 12 x 400cm m3 ###
6 Kayu Jati Kaso 3 x 5 x 400cm m3 7,873,350
7 Kayu Jati Kaso 4 x 6 x 400cm m3 ###
8 Kayu Jati Kaso 5 x 7 x 400cm m3 ###
60
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
61
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
62
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
Bahan Pembersih
1 Sabun Colek Wing Biru 5kg Timba 29,650
ALAT LISTRIK
KABEL
Kabel NYA
1 Kabel NYA Supreme, 2 x 2,5 mm m 9,000
2 Kabel NYA Supreme, 1 x 2.5 mm m 4,000
Kabel NYM
1 Kabel NYM Supreme 2 x 1.5 mm m 8,500
2 Kabel NYM Supreme, 2 x 2.5 mm m 13,000
Kabel NYY
1 Kabel NYY Supreme, 2 X 4 mm m 21,000
2 Kabel NYY Supreme, 4 X 2,5 mm m 23,000
3 Kabel NYY Supreme, 4 X 10 mm m 56,500
Kabel TC & Twisted
1 Kabel TC & Twisted Twisted 2x10 Mm m 9,100
2 Kabel TC & Twisted Twisted 2x16 Mm m 16,000
3 Kabel TC & Twisted Twisted 4x16 Mm m 25,800
Kabel Tray
1 Kabel Tray Lebar 100 x Tinggi 50 x Panjang 2400 x Ketebalan Roll 115,000
2 Kabel Tray Plat
150 x1,2
50mm
x 2400 x 1,2 mm Roll 151,800
3 Kabel Tray 200 x 50 x 2400 x 1,2 mm Roll 166,700
4 Kabel Tray 300 x 50 x 2400 x 1,2 mm Roll 207,000
5 Kabel Tray 400 x 50 x 2400 x 1,2 mm Roll 248,500
6 Kabel Tray 500 x 50 x 2400 x 1,2 mm Roll 295,500
7 Kabel Tray 150 x 100 x 2400 x 1,2 mm Roll 187,400
8 Kabel Tray 200 x 100 x 2400 x 1,2 mm Roll 207,000
9 Kabel Tray 300 x 100 x 2400 x 1,2 mm Roll 253,000
10 Kabel Tray 400 x 100 x 2400 x 1,2 mm Roll 295,500
11 Kabel Tray 500 x 100 x 2400 x 1,2 mm Roll 341,500
LAMPU
Lampu Pijar
1 Lampu Pijar Umum Philips, Clear 25 Watt Buah 5,900
Lampu TL
1 Lampu TL Philips, 18 watt Buah 35,000
2 Lampu TL Philips, 20 Watt + Kap Unit 86,250
3 Lampu TL Philips, 40 Watt + Kap Unit 120,750
Lampu Essential
1 Lampu Essential Philips, 18 watt Buah 36,800
2 Lampu Essential Philips, 23 watt Buah 42,500
3 Lampu SL Philips, 23 Watt Buah 50,600
4 Lampu SL Philips, 14 Watt Buah 40,700
Lampu Lainnya
1 Lampu RM 2 x 36 Watt, Fatro Unit 344,950
2 Lampu RM 2 x 18 Watt, Fatro Unit 287,450
3 Lampu Baret Kotak 32 Watt Buah 247,500
4 Lampu RM 2 x 36 Watt, Artolite Set 665,500
5 Lampu RM 2 x 18 Watt, Artolite Set 431,200
6 Lampu RM 2 x 36 Watt, Saka, Sui, Tap Set 597,850
7 Lampu RM 2 x 18 Watt, Saka Sui, Tap Set 391,160
8 Lampu Spot Light General Bright LED Flood Light - 100 W / IP65 Buah 522,500
9 Lampu Spot Light General Bright LED Flood Light - 80 W / IP65 Buah 412,500
63
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
10 Lampu Spot Light General Bright LED Flood Light - 50 W / IP65 Buah 291,500
11 Lampu Spot Light General Bright LED Flood Light - 30 W / IP65 Buah 192,500
12 Lampu Spot Light General Bright LED Flood Light - 20 W / IP65 Buah 170,500
13 Lampu Spot Light General Bright LED Flood Light - 10 W / IP65 Buah 82,500
14 Lampu Spot Light General LED Flood Light Driver & LED CHIP - 100 W Buah 291,500
15 Lampu Spot Light General LED Flood Light Driver & LED CHIP - 80 W Buah 225,500
16 Lampu Spot Light General LED Flood Light Driver & LED CHIP - 50 W Buah 159,500
17 Lampu Spot Light General LED Flood Light Driver & LED CHIP - 30 W Buah 104,500
18 Lampu Spot Light General LED Flood Light Driver & LED CHIP - 20 W Buah 82,500
19 Lampu Spot Light General LED Flood Light Driver & LED CHIP - 10 W Buah 38,500
20 Lampu Downlight SM D 150 E27 PL ESS 18W, Artolite Unit 310,600
21 Lampu Downlight RD 150 E27 SAVY PL ESS 18W, Artolite Unit 195,700
Stop Kontak
1 Stop Kontak Broco, 2 Port Unit 15,800
Saklar
1 Saklar Broco, Ganda Buah 15,700
2 Saklar Broco, Engkel IB Buah 11,500
Fitting
1 Fitting Plafon Buah 3,750
MCB
1 MCB 10A, 3 Phase Schneider Buah 211,400
Bahan Listrik Lainnya
1 Isolator / Isolasi Plastik Roll 10,100
2 Klem PVC Buah 2,850
PERPIPAAN
PIPA PVC/UPVC
Pipa PVC
1 Pipa PVC buta dia = 12" klas VP AWS 10 m' 569,200
2 Pipa PVC buta dia = 6" klas VP AWS 10 m' 248,000
3 Pipa PVC Maspion AW 1 1/2" X 6 m Batang 121,600
4 Pipa PVC Maspion AW 1 1/4" X 6 m Batang 93,400
5 Pipa PVC Maspion AW 1" X 4 m Batang 44,000
6 Pipa PVC Maspion AW 1" X 6 m Batang 65,900
7 Pipa PVC Maspion AW 1 1/4" X 4 m Batang 62,200
8 Pipa PVC Maspion AW 1 1/2" X 4 m Batang 81,000
9 Pipa PVC Maspion AW 1/2" X 4 m Batang 28,700
10 Pipa PVC Maspion AW 1/2" X 6 m Batang 43,000
11 Pipa PVC Maspion AW 10" X 4 m Batang 1,480,000
12 Pipa PVC Maspion AW 10" X 6 m Batang 2,220,100
13 Pipa PVC Maspion AW 12" X 4 m Batang 2,114,900
14 Pipa PVC Maspion AW 12" X 6 m Batang 3,172,400
15 Pipa PVC Maspion AW 14" X 4 m Batang 1,898,000
16 Pipa PVC Maspion AW 14" X 6 m Batang 4,463,300
17 Pipa PVC Maspion AW 16" X 4 m Batang 3,719,300
18 Pipa PVC Maspion AW 16" X 6 m Batang 5,301,200
19 Pipa PVC Maspion AW 2 1/2" X 6 m Batang 231,800
20 Pipa PVC Maspion AW 2" X 4 m Batang 120,400
21 Pipa PVC Maspion AW 2" X 6 m Batang 180,500
22 Pipa PVC Maspion AW 2 1/2" X 4 m Batang 154,500
23 Pipa PVC Maspion AW 3" X 4 m Batang 220,500
24 Pipa PVC Maspion AW 3" X 6 m Batang 330,700
25 Pipa PVC Maspion AW 3/4" X 4 m Batang 29,000
26 Pipa PVC Maspion AW 3/4" X 6 m Batang 52,300
64
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
65
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
66
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018
67
2018 ZONA
1 Kes
13,800
13,800
2,300
19,700
15,600
16,100
2,100
17,000
46,800
57,400
42,300
56,300
14,550
760,000
780,000
800,000
820,000
850,000
900,000
950,000
1,000,000
1,060,000
36,800
17,850
161,000
230,600
312,850
92,500
123,300
97,500
123,750
106,850
151,050
1,189,900
2,172,900
655,000
750,000
825,000
302,000
302,000
175,000
75,000
134,250
90,000
68
2018 ZONA
1 Kes
81,400
700
6,000
143,750
103,500
115,800
98,300
96,100
21,800
9,900
8,000
136,600
141,700
258,700
262,900
252,950
139,850
236,200
181,200
25,200
39,800
121,000
208,600
50,600
35,100
25,400
3,300
41,700
41,700
60,000
185,750
61,550
60,650
28,200
28,000
11,700
58,950
27,000
36,000
40,500
4,600
53,150
14,400
110,750
99,600
55,900
57,000
28,600
12,000
39,400
89,000
96,100
69
2018 ZONA
1 Kes
41,000
112,500
185,750
77,500
55,250
70
2018 ZONA
1 Kes
50,350
191,350
861,450
89,700
53,100
54,000
77,000
46,250
139,700
103,500
113,800
26,500
17,300
20,900
42,300
65,700
8,700
20,000
41,800
30,000
46,500
35,000
45,000
50,000
72,900
77,000
13,000
110,000
242,250
145,450
201,400
272,450
12,750
12,750
29,100
212,950
79,000
33,000
151,500
12,750
10,500
11,000
18,100
27,000
20,250
86,000
86,000
109,650
147,000
71
2018 ZONA
1 Kes
175,000
250,000
72
2018 ZONA
1 Kes
400,000
6,000
8,900
6,750
14,750
24,000
8,800
11,000
4,600
5,500
8,600
5,500
10,000
2,100
1,350
9,400
52,800
13,800
35,300
79,900
95,100
105,900
48,000
60,700
70,000
93,100
65,000
111,300
71,400
100,000
123,100
161,100
22,000
23,900
33,900
36,200
41,900
584,700
73,900
25,900
4,500
104,650
103,000
107,700
120,000
63,700
650,000
110,000
57,500
73
2018 ZONA
1 Kes
5,000
4,900
51,000
65,000
67,000
37,000
42,000
50,000
58,000
68,000
80,500
74,100
85,100
20,000
106,200
53,100
73,900
25,650
50,000
33,000
67150
33600
1,459,900
152,800
109,800
2,200,000
108,550
191,700
352,400
546,200
931,200
700,900
357,300
595,600
201,650
410,700
35,000
347,100
410,700
11,000
466,300
524,600
74
2018 ZONA
1 Kes
282,800
900
54,250
57,950
55,300
56,900
25,000
52,600
45,500
50,600
23,500
56,200
60,450
230,500
307,400
163,800
208,300
238,800
93,000
103,000
95,000
105,000
160,000
125,000
130,000
102,000
8,000
12,350
18,450
18,600
22,750
14,100
8,150
34,100
563,000
315,600
457,400
237,700
245,300
218,100
22,200
24,450
15,850
1,100
200
589,400
330,700
75
2018 ZONA
1 Kes
539,850
272,100
231,600
1,251,900
188,300
300
76
2018 ZONA
1 Kes
109,350
93,300
61,700
17,200
51,600
60,000
118,300
46,400
68,950
315,000
12,400
13,500
16,000
16,800
24,300
27,100
10,100
28,200
64,090
105,272
103,100
119,700
131,300
150,700
18,600
103,500
60,700
75,900
88,000
105,000
108,000
130,000
130,000
76,500
96,500
101,500
126,500
19,550
21,550
3,564,050
3,000,000
18,009,150
18,009,150
7,873,350
13,031,500
13,446,700
77
2018 ZONA
1 Kes
18,009,150
12,071,750
12,646,600
10,922,050
8,622,700
9,772,350
7,248,050
7,137,500
5,537,700
7,686,600
6,523,200
5,386,100
5,386,100
5,565,700
5,075,300
95,000
150,000
95,400
129,000
124,600
75,500
114,700
126,100
55,300
80,000
88,650
100,700
1,336,500
356,800
538,000
352,400
197,600
323,900
1,403,000
1,604,000
210,500
236,800
289,500
223,700
644,800
1,862,500
1,070,900
7,350
9,250
5,750
40,000
10,200
78
2018 ZONA
1 Kes
15,750
15,800
21,600
25,000
275,000
24,500
744,500
24,700
28,000
21,500
35,000
17,000
18,700
15,000
33,300
106,600
20,000
10,000
6,000
18,500
60,000
20,000
17,500
13,500
45,000
45,500
147,200
95,600
73,700
402,300
75,000
47,050
201,100
125,000
9,800
20,000
18,100
20,000
86,800
186,300
129,250
150,000
14,900
135,000
79
2018 ZONA
1 Kes
29,650
9,000
4,000
8,500
13,000
21,000
23,000
56,500
9,100
16,000
25,800
115,000
151,800
166,750
207,000
248,500
295,500
187,400
207,000
254,100
295,500
341,500
5,900
35,000
86,250
120,750
36,800
42,500
50,600
40,700
344,950
287,450
247,500
665,500
431,200
597,850
391,160
522,500
412,500
80
2018 ZONA
1 Kes
291,500
192,500
170,500
82,500
291,500
225,500
159,500
104,500
82,500
38,500
310,600
195,700
15,800
15,700
11,500
3,750
211,400
10,100
2,850
569,200
248,000
121,600
93,400
44,000
65,900
62,200
81,000
28,700
43,000
1,480,000
2,220,100
2,114,900
3,172,400
1,898,000
4,463,300
3,719,300
5,301,200
231,800
120,400
180,500
154,500
220,500
330,700
29,000
52,300
81
2018 ZONA
1 Kes
321,300
481,900
505,700
760,100
669,800
1,004,700
1,041,700
1,562,600
33,700
45,400
25,300
38,000
20,000
30,100
61,000
91,500
48,100
72,200
70,800
106,200
13,600
20,400
91,300
136,900
7,500
11,200
127,700
65,900
58,100
38,700
44,000
1,063,300
1,595,000
1,449,300
2,173,900
1,898,000
2,847,100
2,456,800
3,685,300
57,500
86,200
85,100
4,243,900
6,366,000
123,500
185,200
173,600
260,400
283,600
425,400
344,500
516,700
609,300
913,900
82
2018 ZONA
1 Kes
47,300
83,000
1,776,000
153,800
169,800
318,900
40,600
499,000
1,039,700
1,238,600
323,200
674,000
793,500
1,051,350
1,482,100
1,798,050
150,550
191,550
249,650
319,000
396,200
532,000
733,750
861,700
1,223,700
1,752,750
2,088,450
3,509,250
153,050
189,000
289,950
374,250
444,000
658,450
840,850
1,041,500
1,507,100
1,950,300
2,356,700
186,000
238,950
366,400
483,600
555,600
758,100
966,950
1,249,150
1,808,450
2,433,850
2,897,400
4,161,850
305,450
83
2018 ZONA
1 Kes
357,200
426,050
651,600
690,200
3,150
40,250
51,900
23,250
500
5,500
550
2,500
2,650
17,150
2,000
78,350
5,950
25,000
50,000
5,500
50,000
84
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
760,000
780,000
800,000
820,000
850,000
900,000
950,000
1,000,000
1,060,000
85
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
86
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
47,440 1 36,900 36,900 41,000 57,550 57,550
125,000 1 101,250 101,200
203,050 1 167,175 167,100 187,050 187,050
77,500
55,250
87
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
88
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
175,000 1 157,500 157,500 175,000
250,000 1 225,000 225,000 250,000
89
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
90
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
91
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
314,250 1 254,520 254,500 314,250 314,250
1,100 1 810 800 1,000 1,000
54,250 1 48,825 48,800 50,000 52,050 52,050
57,950 1 52,155 52,100 55,000 57,950 57,950
61,550 1 49,770 49,700 55,000 57,500 57,500
63,250 1 51,210 51,200 55,000 63,250 63,250
32,450 1 22,500 22,500 23,000 32,450 32,450
58,500 1 47,340 47,300 47,500 58,500 58,500
50,650 1 40,950 40,900 42,000 50,650 50,650
56,250 1 45,540 45,500 46,000 56,250 56,250
23,500 1 21,150 21,100 23,000 21,850 21,850
62,500 1 50,580 50,500 62,500 62,500
60,450 1 54,405 54,400 61,200 83,950 83,950
230,500
307,400
163,800
208,300
238,800
93,000
103,000
95,000
105,000
160,000
125,000
130,000
102,000
92
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
539,850 1 485,865 485,800 539,850 539,850
272,100 1 244,890 244,800 272,100 272,100
326,150 1 208,440 208,400 231,600 304,700 304,700
1,391,050 1 1,126,710 1,126,700 1,391,050 1,391,050
-
350 1 270 200 350 350
93
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
94
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
18,009,150 1 16,208,235 16,208,200 10,350,000 18,009,150 18,009,150
12,071,750 1 10,864,575 10,864,500 10,350,000 12,071,750 12,071,750
12,646,600 1 11,381,940 11,381,900 10,350,000 12,646,600 12,646,600
10,922,050 1 9,829,845 9,829,800 10,922,050 10,922,050
8,622,700 1 7,760,430 7,760,400 7,930,650 7,930,650
9,772,350 1 8,795,115 8,795,100 9,772,350 9,772,350
7,248,050 1 6,523,245 6,523,200 8,622,700 8,622,700
7,930,650 1 6,423,750 6,423,700 6,000,000 7,930,650 7,930,650
6,153,000 1 4,983,930 4,983,900 5,500,000 6,100,500 6,100,500
8,540,700 1 6,917,940 6,917,900 6,500,000 8,540,700 8,540,700
7,248,050 1 5,870,880 5,870,800 5,500,000 6,100,500 6,100,500
5,984,600 1 4,847,490 4,847,400 5,490,450 5,490,450
5,984,600 1 4,847,490 4,847,400 5,490,450 5,490,450
6,184,150 1 5,009,130 5,009,100 5,673,500 5,673,500
5,639,250 1 4,567,770 4,567,700 5,173,600 5,173,600
157,500 1 85,500 85,500 95,000 157,500 157,500
224,200 1 135,000 135,000 150,000 224,200 224,200
106,000 1 85,860 85,800 106,000 106,000
143,400 1 116,100 116,100 143,400 143,400
138,550 1 112,140 112,100 138,550 138,550
83,950 1 67,950 67,900 83,950 83,950
127,450 1 103,230 103,200 127,450 127,450
140,200 1 113,490 113,400 140,200 140,200
61,550 1 49,770 49,700 50,000 61,550 61,550
80,000 1 72,000 72,000 74,750 74,750
88,650 1 79,785 79,700 83,000 82,800 82,800
100,700 1 90,630 90,600 100,050 100,050
95
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
96
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
97
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
291,500
192,500
170,500
82,500
291,500
225,500
159,500
104,500
82,500
38,500
345,115 1 279,540 279,500 345,115 345,115
217,465 1 176,130 176,100 217,465 217,465
98
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
357,050 1 289,170 289,100 268,000 341,900 341,900
535,550 1 433,710 433,700 469,500 501,900 501,900
561,900 1 455,130 455,100 493,700 515,500 515,500
844,650 1 684,090 684,000 740,600 788,400 788,400
744,250 1 602,820 602,800 601,200 699,900 699,900
1,116,350 1 904,230 904,200 978,800 1,043,300 1,043,300
1,157,550 1 937,530 937,500 1,014,900 1,082,900 1,082,900
1,736,300 1 1,406,340 1,406,300 1,522,400 1,624,300 1,624,300
33,700 1 30,330 30,300 29,800 32,300 32,300
50,550 1 40,860 40,800 44,300 47,000 47,000
28,150 1 22,770 22,700 26,500 25,900 25,900
42,250 1 34,200 34,200 37,000 39,300 39,300
22,300 1 18,000 18,000 22,600 20,500 20,500
33,450 1 27,090 27,000 29,200 31,100 31,100
67,800 1 54,900 54,900 52,400 65,000 65,000
101,700 1 82,350 82,300 89,100 94,300 94,300
53,550 1 43,290 43,200 41,800 51,300 51,300
80,300 1 64,980 64,900 70,300 74,700 74,700
78,750 1 63,720 63,700 61,800 75,400 75,400
118,100 1 95,580 95,500 103,500 109,700 109,700
15,150 1 12,240 12,200 15,400 14,000 14,000
22,700 1 18,360 18,300 19,900 21,100 21,100
101,450 1 82,170 82,100 79,300 97,100 97,100
152,150 1 123,210 123,200 133,300 140,000 140,000
8,350 1 6,750 6,700 7,000 7,700 7,700
12,500 1 10,080 10,000 10,900 11,600 11,600
141,950 1 114,930 114,900 94,600 131,600 131,600
73,300 1 59,310 59,300 54,800 68,000 68,000
64,650 1 52,290 52,200 56,700 60,000 60,000
43,100 1 34,830 34,800 35,600 41,300 41,300
48,900 1 39,600 39,600 38,900 46,800 46,800
1,181,500 1 956,970 956,900 1,035,900 1,094,800 1,094,800
1,772,250 1 1,435,500 1,435,500 1,553,900 1,643,600 1,643,600
1,610,350 1 1,304,370 1,304,300 1,411,900 1,493,400 1,493,400
2,415,500 1 1,956,510 1,956,500 2,117,900 2,239,600 2,239,600
2,108,950 1 1,708,200 1,708,200 1,849,200 1,956,000 1,956,000
3,163,450 1 2,562,390 2,562,300 2,773,800 2,932,900 2,932,900
2,729,850 1 2,211,120 2,211,100 2,393,600 2,531,500 2,531,500
4,094,800 1 3,316,770 3,316,700 3,590,400 3,796,500 3,796,500
63,900 1 51,750 51,700 52,000 61,200 61,200
95,800 1 77,580 77,500 84,000 88,900 88,900
94,650 1 76,590 76,500 74,400 46,800 46,800
4,715,550 1 3,819,510 3,819,500 4,134,800 4,373,100 4,373,100
7,073,350 1 5,729,400 5,729,400 6,202,200 6,559,800 6,559,800
137,250 1 111,150 111,100 103,000 131,400 131,400
205,850 1 166,680 166,600 180,400 190,900 190,900
192,950 1 156,240 156,200 146,500 184,800 184,800
289,400 1 234,360 234,300 253,700 268,400 268,400
315,150 1 255,240 255,200 253,100 301,700 301,700
472,700 1 382,860 382,800 414,400 438,500 438,500
382,800 1 310,050 310,000 307,800 366,600 366,600
574,200 1 465,030 465,000 503,400 532,500 532,500
677,000 1 548,370 548,300 593,600 627,300 627,300
1,015,500 1 822,510 822,500 890,400 941,600 941,600
99
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
52,657 1 42,570 42,500 41,000 60,555 60,555
92,290 1 74,700 74,700 100,000 92,290 92,290
1,973,400 1 1,598,400 1,598,400 2,300,000 1,810,435 1,810,435
170,940 1 138,420 138,400 140,000 170,940 170,940
188,750 1 152,820 152,800 200,000 184,910 184,910
354,365 1 287,010 287,000 280,000 354,365 354,365
45,185 1 36,540 36,500 40,000 45,185 45,185
554,455 1 449,100 449,100 420,000 554,455 554,455
1,155,275 1 935,730 935,700 880,000 1,155,275 1,155,275
1,376,250 1 1,114,740 1,114,700 1,450,000 1,279,355 1,279,355
359,205 1 290,880 290,800 430,000 359,205 359,205
100
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
357,200 1 321,480 321,400 357,200 357,200
426,050 1 383,445 383,400 426,050 426,050
651,600 1 586,440 586,400 651,600 651,600
101
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
5 6 7 8
102
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
103
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
57,550 57,550 57,550 57,550 (29)
104
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
105
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
106
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
57,500 57,500
107
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
108
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
394,150 394,150 394,150 394,150
1,000 1,000 1,000 1,000
51,750 51,750 51,750 53,050
54,050 54,050 57,950 53,300
57,500 57,500 55,300 56,450
63,250 63,250 56,900 61,450
32,450 32,450 32,450 32,450
51,250 51,250 51,250 51,250
48,250 48,250 48,250 48,250
54,350 54,350 54,350 54,350
21,850 21,850 21,850 20,000
62,500 62,500 62,500 62,500
83,950 83,950 83,950 83,000
109
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
466,350 466,350 466,350 466,350
272,100 272,100 272,100 272,100
304,700 304,700 304,700 301,150
110
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
111
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
18,009,150 18,009,150 18,729,550 18,009,150
12,071,750 12,071,750 12,554,650 11,000,000
12,646,600 12,646,600 13,152,500 12,500,600
10,922,050 10,922,050 11,358,950 10,795,950
7,930,650 7,930,650 8,247,900 7,930,650
9,772,350 9,772,350 10,163,250 8,925,000
8,622,700 8,622,700 8,967,650 8,000,000
7,930,650 7,930,650 6,344,550 7,930,650
6,100,500 6,100,500 6,344,550 6,100,500
8,540,700 8,540,700 8,882,350 8,540,700
6,100,500 6,100,500 6,344,550 6,100,500
5,490,450 5,490,450 5,710,100 5,490,450
5,490,450 5,490,450 5,710,100 5,490,450
5,673,500 5,673,500 5,900,450 5,673,500
5,173,600 5,173,600 5,380,550 4,725,000
150,000 157,500 163,800 157,500
200,000 224,200 233,200 224,200
106,000 106,000 110,300 106,000
143,400 143,400 149,200 143,400
138,550 138,550 144,100 138,550
83,950 83,950 87,350 77,200
127,450 127,450 132,600 127,450
140,200 140,200 145,900 140,200
61,550 61,550 64,050 58,000
74,750 74,750 77,750 69,550
82,800 82,800 86,150 81,850
100,050 100,050 104,100 100,050
112
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
113
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
114
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
345,115 345,115
217,465 217,465
115
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
322,300 322,300 322,300 318,600
458,300 458,300 458,300 458,300
470,750 470,750 470,750 470,750
719,950 719,950 719,950 719,950
639,150 639,150 639,150 639,150
952,700 952,700 952,700 952,700
988,900 988,900 988,900 988,900
1,483,300 1,483,300 1,483,300 1,483,300
30,500 30,500 30,500 30,150
42,850 42,850 42,850 42,850
23,650 23,650 23,650 23,650
35,850 35,850 35,850 35,850
18,700 18,700 18,700 18,700
28,400 28,400 28,400 28,400
61,350 61,350 61,350 56,700
86,050 86,050 86,050 42,850
48,300 48,300 48,300 47,750
68,200 68,200 68,200 68,200
71,100 71,100 71,100 70,250
100,100 100,100 100,100 100,100
12,700 12,700 12,700 12,700
19,200 19,200 19,200 19,200
91,550 91,550 91,550 90,500
127,850 127,850 127,850 127,850
6,950 6,950 6,950 6,950
10,550 10,550 10,550 10,550
120,150 120,150 120,150 120,150
62,100 62,100 62,100 62,100
54,750 54,750 54,750 54,750
38,900 38,900 38,900 37,500
44,200 44,200 44,200 43,700
999,750 999,750 999,750 999,750
1,500,950 1,500,950 1,500,950 1,500,950
1,363,800 1,363,800 1,363,800 1,363,800
2,045,250 2,045,250 2,045,250 2,045,250
1,786,300 1,786,300 1,786,300 1,786,300
2,678,400 2,678,400 2,678,400 2,678,400
2,311,800 2,311,800 2,311,800 2,311,800
3,467,050 3,467,050 3,467,050 3,467,050
57,800 57,800 57,800 57,100
81,100 81,100 81,100 81,100
83,150 83,150 83,150 82,150
3,993,650 3,993,650 3,993,650 3,993,650
5,990,600 5,990,600 5,990,600 5,990,600
123,850 123,850 123,850 120,000
174,300 174,300 174,300 174,300
174,250 174,250 174,250 168,000
245,100 245,100 245,100 245,100
284,600 284,600 284,600 281,300
400,450 400,450 400,450 400,450
345,550 345,550 345,550 341,550
486,300 486,300 486,300 486,300
572,850 572,850 572,850 572,850
859,850 859,850 859,850 859,850
116
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
60,555 60,555 60,555 60,555
92,290 92,290 92,290 92,290
1,810,435 1,810,435 1,810,435 1,810,435
170,940 170,940 170,940 170,940
184,910 184,910 184,910 184,910
354,365 354,365 354,365 354,365
45,815 45,815 45,815 45,815
554,455 554,455 554,455 554,455
1,155,275 1,155,275 1,155,275 1,155,275
1,279,355 1,279,355 1,279,355 1,279,355
359,205 359,205 359,205 359,205
117
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
357,200 357,200 357,200 357,200
426,050 426,050 426,050 426,050
651,600 651,600 651,600 651,600
118
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
7 5
13,150 13,550
12,750 13,550
2,150 2,250
18,000 19,700
14,250 15,600
14,800 15,600
2,000 2,100
16,600 17,000
325,000 341,250
62,000 65,950
77,000 81,200
61,000 62,550
75,000 77,300
12,250 13,450
35,100 35,100
15,300 16,700
373,750 159,100
715,875 227,300
272,100 309,300
84,000 92,000
92,000 105,000
98,150 98,150
110,000 114,000
129,600 129,600
1,281,150 1,281,150
2,379,200 2,379,200
617,550 701,200
1,281,675 1,455,750
183,050 193,200
176,950 181,850
189,150 198,900
60,000 60,000
115,950 115,950
75,000
119
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
87,000 87,000
750 750
5,400 5,400
125,300 135,000
115,000 115,000
103,200 103,200
106,400 106,400
99,000 99,000
24,300 24,300
9,400 9,400
6,700 6,700
140,000 140,000
136,000 136,000
268,450 268,450
244,050 244,050
240,400 240,400
120,000 120,000
213,550 213,550
164,750 164,750
50,650 50,650
40,950 40,950
134,500 134,500
88,500 136,800
51,250 53,150
39,050 39,050
24,450 24,450
3,700 3,700
27,500 27,500
26,300 26,300
65,950
187,050 187,050
56,500 56,500
54,950 54,950
27,500 27,500
25,500 25,500
9,800 9,800
51,250 58,300
26,300 26,300
36,050 36,050
36,650 36,650
4,500 5,150
51,250 51,250
11,650 11,650
16,650 106,800
93,950 93,950
90,950 90,950
78,050 78,050
26,850 29,350
9,800 9,800
36,650 36,650
128,000 126,000
142,600 142,600
120
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
57,550 57,550
187,050 187,050
121
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
42,750 42,750
158,650 158,650
774,800 774,800
82,400 82,400
53,700 53,700
78,750 78,750
111,700 111,700
73,250 73,250
145,200 145,200
106,650 106,650
117,750 117,750
25,500 25,500
19,300 19,300
23,250 23,250
46,200 46,200
73,100 73,100
9,750 9,750
34,150 34,150
46,450 46,450
48,250 48,250
51,700 51,700
57,350 57,350
62,250 62,250
69,550 69,550
76,900 76,900
84,200 84,200
14,500 14,500
100,050 100,050
231,800 231,800
140,650 140,650
197,750 197,750
272,450 272,450
14,000 14,000
14,000 14,000
29,100 29,100
212,950 212,950
33,750 33,750
20,250 20,250
13,500 13,500
12,500 13,000
13,000 13,200
176,700 169,900
95,950 95,950
84,500 84,500
122
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
354,600
6,050 6,500
8,000 8,000
6,150 6,150
13,300 13,450
8,800 8,800
11,000 11,000
4,050 4,100
10,400 10,400
2,100 2,200
2,000 1,250
10,550 10,550
58,700 58,700
12,190 13,500
39,675 30,000
88,800 88,800
105,750 105,750
117,750 117,750
53,400 53,400
63,450 63,450
73,250 77,300
85,450 85,450
67,150 67,150
109,850 109,850
79,350 79,350
146,450 146,450
91,550 91,550
128,150
18,350
26,600
33,900
36,650
42,750
584,700 584,700
73,900 73,900
24,000 24,000
4,450 4,450
62,450 62,450
50,150 50,150
103,700 103,700
92,800 92,800
58,400 58,400
123
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
4,900 4,900
4,300 4,550
81,650 81,650
143,300
128,150 128,150
68,650 68,650
84,550 84,550
61,050 61,050
68,350 68,350
72,500 78,000
86,650 86,000
92,500 95,000
94,600
18,350 18,350
108,050 108,050
56,150 56,150
68,200
22,300 25,400
52,400 55,000
36,000 36,500
67,150 67,150
33600 33600
1,300,000 1,430,000
143,400 143,400
109,850 109,850
2,440,200 2,440,200
103,450 103,450
193,200
274,550 274,550
372,050 372,050
1,022,800
700,900 700,900
357,300 357,300
595,650 595,650
170,850
21,600
30,550 30,550
381,300
451,150
11,000 11,000
518,150 518,150
582,900 582,900
124
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
394,150 394,150
1,000 1,000
53,050 53,050
53,300 53,300
56,450 56,450
61,450 61,450
32,450 32,450
50,450 51,250
45,650 48,250
53,500 54,350
20,000 20,000
62,500 62,500
83,000
6,750 6,750
11,650 11,650
16,550 16,550
17,100 17,100
19,550 19,550
12,250 13,400
8,550 8,550
573,950 573,950
323,900 323,900
466,350 466,350
242,350 242,350
250,100 250,100
242,350 242,350
24,450 24,450
24,450 24,450
14,500 14,500
1,300 1,300
589,400 589,400
330,700 330,700
125
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
466,350 466,350
272,100 272,100
301,150
198,900
350 350
126
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
100,100 100,100
88,650 88,650
71,850 68,650
18,350 18,350
62,250 62,250
94,600 94,600
131,200 131,200
39,700 39,700
59,250 59,250
13,750 13,750
15,000 15,000
17,800 17,800
18,700 18,700
27,050 27,050
30,150 30,150
48,850 48,850
30,550 30,550
97,500 106,000
120,000 123,000
115,000 135,000
130,000 155,000
20,750 20,750
29,300 29,300
53,650
58,100
18,000 19,550
19,750 19,750
3,000,000 3,000,000
160,950 160,950
### 18,009,150
### 18,009,150
7,873,350 7,873,350
### 13,031,500
### 13,446,700
127
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
### 18,009,150
### 11,000,000
### 12,500,600
9,975,000 10,795,950
7,930,650 7,930,650
8,925,000 8,925,000
7,350,000 8,000,000
7,930,650 7,930,650
6,100,500 6,100,500
8,540,700 8,540,700
6,100,500 6,100,500
5,490,450 5,490,450
5,490,450 5,490,450
5,673,500 5,673,500
4,725,000 4,725,000
150,000 150,000
195,000 195,000
106,000 106,000
143,400 143,400
138,550 138,550
77,200 77,200
127,450 127,450
140,200 140,200
58,000 58,000
69,550 69,550
79,350 81,850
100,050 100,050
1,427,550 1,427,550
396,550 396,550
597,850 597,850
390,450 390,450
219,650 219,650
359,950 359,950
218,200
245,500
300,050
231,850
654,600
2,045,550
1,176,200
6,500 6,500
10,000 10,900
5,500 5,500
40,000 40,000
10,200 10,200
128
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
15,750 15,750
18,250 18,250
24,350 24,350
30,450 30,450
401,500 401,500
19,200 19,200
827,250 827,250
25,200 25,200
31,150 31,150
19,500 19,500
682,500 682,500
18,900 18,900
20,800 20,800
29,500 29,500
93,555 37,000
118,550 118,550
33,900 33,900
14,300 14,300
6,450 6,450
16,150 16,150
68,550 68,550
26,550 26,550
19,050 19,050
12,000 12,000
57,500 57,500
45,500
163,650
113,650
72,350 72,350
447,000 447,000
56,700 56,700
43,150 43,150
196,625 223,500
158,895 180,600
8,150 8,600
24,250 24,250
19,900 19,900
39,800
96,450 96,450
160,650 160,650
119,600 119,600
319,300 319,300
15,250 15,250
109,500 113,650
129
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
10,250 10,250
4,950 10,850
5,513 4,500
9,300 9,300
13,000 13,000
21,050 21,050
24,700 26,150
9,188 9,188
16,013 16,013
25,830 25,830
142,100
150,050
170,500
210,250
251,150
292,100
185,250
210,250
251,150
292,100
337,550
6,143 6,143
32,025 35,000
80,850 85,250
110,513 119,350
38,300 40,950
43,200
340,950
284,150
153,450
130
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
24,700 25,050
14,850 14,850
13,000 14,300
3,750 3,750
364,140 364,140
9,818 9,818
2,573 2,573
632,550 632,550
275,650 275,650
117,650 117,650
90,450 90,450
40,900 43,700
63,950 63,950
60,300 61,750
78,400 80,400
26,650 28,450
42,250 42,250
1,398,900 1,398,900
2,098,350 2,098,350
2,019,950 2,019,950
3,002,800 3,002,800
2,809,850 2,809,850
4,220,750 4,220,750
3,521,350 3,521,350
4,935,050 4,935,050
223,100 223,100
114,600 119,350
174,900 174,900
150,750 153,200
211,050 218,600
319,600 319,600
32,550 34,700
51,300 51,300
131
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
307,550 318,600
458,300 458,300
470,750 470,750
719,950 719,950
639,150 639,150
952,700 952,700
988,900 988,900
1,483,300 1,483,300
28,200 30,150
42,850 42,850
23,650 23,650
35,850 35,850
18,700 18,700
28,400 28,400
56,700 56,700
86,050 42,850
44,800 47,750
68,200 68,200
65,850 70,250
100,100 100,100
12,700 12,700
19,200 19,200
84,800 90,500
127,850 127,850
6,950 6,950
10,550 10,550
120,150 120,150
62,100 62,100
54,750 54,750
34,350 37,500
40,900 43,700
999,750 999,750
1,500,950 1,500,950
1,363,800 1,363,800
2,045,250 2,045,250
1,786,300 1,786,300
2,678,400 2,678,400
2,311,800 2,311,800
3,467,050 3,467,050
53,450 57,100
81,100 81,100
75,300 82,150
3,993,650 3,993,650
5,990,600 5,990,600
109,250 120,000
174,300 174,300
153,650 168,000
245,100 245,100
267,000 281,300
400450 400,450
324,200 341,550
486,300 486,300
572,850 572,850
859,850 859,850
132
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
60,555 60,555
92,290 92,290
1,810,435 1,810,435
170,940 170,940
184,910 184,910
354,365 354,365
45,815 45,815
554,455 554,455
1,155,275 1,155,275
1,279,355 1,279,355
359,205 359,205
674,000 674,000
793,500 793,500
1,051,350 1,051,350
1,482,100 1,482,100
1,798,050 1,798,050
150,550 150,550
191,550 191,550
249,650 249,650
319,000 319,000
396,200 396,200
532,000 532,000
733,750 733,750
861,700 861,700
1,223,700 1,223,700
1,752,750 1,752,750
2,088,450 2,088,450
3,509,250 3,509,250
153,050 153,050
189,000 189,000
289,950 289,950
374,250 374,250
444,000 444,000
658,450 658,450
840,850 840,850
1,041,500 1,041,500
1,507,100 1,507,100
1,950,300 1,950,300
2,356,700 2,356,700
186,000 186,000
238,950 238,950
366,400 366,400
483,600 483,600
555,600 555,600
758,100 758,100
966,950 966,950
1,249,150 1,249,150
1,808,450 1,808,450
2,433,850 2,433,850
2,897,400 2,897,400
4,161,850 4,161,850
305,450 305,450
133
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
357,200 357,200
426,050 426,050
651,600 651,600
766,900 766,900
2,900 2,900
36,750 36,750
51,900 51,900
23,250 23,250
2,400 2,400
15,700 15,700
4,600 4,600
33,750 33,750
134
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
7 8 9 10 11
135
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
136
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
57,550 57,550 57,550 57,550
137
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
138
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
139
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
140
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
394,150 394,150 394,150 394,150
1,000 1,000 1,000 1,000
53,050 53,050 53,050 53,050
53,300 53,300 53,300 53,300
56,450 56,450 56,450 56,450
61,450 61,450 61,450 61,450
32,450 32,450 32,450 32,450
50,450 51,250 51,250 51,250
45,650 48,250 48,250 48,250
53,500 54,350 54,350 54,350
20,000 20,000 20,000 20,000
62,500 62,500 62,500 62,500
83,000 83,000 83,000
141
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
466,350 466,350 466,350 466,350
272,100 272,100 272,100 272,100
301,150 301,150 301,150
142
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
143
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
18,009,150 18,009,150 ### ### 18,009,150 18,000,000
10,000,000 11,000,000 ### ### 11,000,000 11,000,000
12,500,000 12,500,600 ### ### 12,500,600 12,500,600
9,975,000 10,795,950 7,000,000 8,400,000 10,795,950 8,400,000
7,930,650 7,930,650 6,900,000 8,280,000 7,930,650 7,930,650
8,925,000 8,925,000 7,500,000 9,000,000 8,925,000 8,925,000
7,350,000 8,000,000 7,000,000 8,400,000 8,000,000 8,000,000
7,930,650 7,930,650 5,000,000 6,000,000 7,930,650 6,000,000
6,100,500 6,100,500 4,500,000 5,400,000 6,100,500 5,400,000
8,540,700 8,540,700 4,700,000 5,640,000 8,540,700 5,640,000
6,100,500 6,100,500 4,500,000 5,400,000 6,100,500 5,400,000
5,490,450 5,490,450 5,490,450 5,490,450
5,490,450 5,490,450 3,700,000 4,440,000 5,490,450 4,440,000
5,673,500 5,673,500 3,700,000 4,440,000 5,673,500 4,440,000
4,725,000 4,725,000 3,700,000 4,440,000 4,725,000 4,440,000
150,000 150,000 150,000 157,500
190,000 195,000 195,000 224,200
106,000 106,000 106,000 106,000
143,400 143,400 143,400 143,400
138,550 138,550 138,550 138,550
77,200 77,200 77,200 77,200
127,450 127,450 127,450 127,450
140,200 140,200 110,000 132,000 140,200 132,000
58,000 58,000 55,000 66,000 58,000 58,000
69,550 69,550 65,000 78,000 69,550 69,550
79,350 81,850 79,000 94,800 81,850 81,850
100,050 100,050 100,050 100,050
144
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
145
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
146
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
147
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
307,550 318,600 318,600 318,600
458,300 458,300 458,300 458,300
470,750 470,750 470,750 470,750
719,950 719,950 719,950 719,950
639,150 639,150 639,150 639,150
952,700 952,700 952,700 952,700
988,900 988,900 988,900 988,900
1,483,300 1,483,300 1,483,300 1,483,300
28,200 30,150 30,150 30,150
42,850 42,850 42,850 42,850
23,650 23,650 23,650 23,650
35,850 35,850 35,850 35,850
18,700 18,700 18,700 18,700
28,400 28,400 28,400 28,400
56,700 56,700 56,700 56,700
86,050 42,850 42,850 42,850
44,800 47,750 47,750 47,750
68,200 68,200 68,200 68,200
65,850 70,250 70,250 70,250
100,100 100,100 100,100 100,100
12,700 12,700 12,700 12,700
19,200 19,200 19,200 19,200
84,800 90,500 90,500 90,500
127,850 127,850 127,850 127,850
6,950 6,950 6,950 6,950
10,550 10,550 10,550 10,550
120,150 120,150 120,150 120,150
62,100 62,100 62,100 62,100
54,750 54,750 54,750 54,750
34,350 37,500 37,500 37,500
40,900 43,700 43,700 43,700
999,750 999,750 999,750 999,750
1,500,950 1,500,950 1,500,950 1,500,950
1,363,800 1,363,800 1,363,800 1,363,800
2,045,250 2,045,250 2,045,250 2,045,250
1,786,300 1,786,300 1,786,300 1,786,300
2,678,400 2,678,400 2,678,400 2,678,400
2,311,800 2,311,800 2,311,800 2,311,800
3,467,050 3,467,050 3,467,050 3,467,050
53,450 57,100 57,100 57,100
81,100 81,100 81,100 81,100
75,300 82,150 82,150 82,150
3,993,650 3,993,650 3,993,650 3,993,650
5,990,600 5,990,600 5,990,600 5,990,600
109,250 120,000 120,000 120,000
174,300 174,300 174,300 174,300
153,650 168,000 168,000 168,000
245,100 245,100 245,100 245,100
267,000 281,300 281,300 281,300
400450 400,450 400,450 400,450
324,200 341,550 341,550 341,550
486,300 486,300 486,300 486,300
572,850 572,850 572,850 572,850
859,850 859,850 859,850 859,850
148
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
60,555 60,555 60,555 60,555
92,290 92,290 92,290 92,290
1,810,435 1,810,435 1,810,435 1,810,435
170,940 170,940 170,940 170,940
184,910 184,910 184,910 184,910
354,365 354,365 354,365 354,365
45,815 45,815 45,815 45,815
554,455 554,455 554,455 554,455
1,155,275 1,155,275 1,155,275 1,155,275
1,279,355 1,279,355 1,279,355 1,279,355
359,205 359,205 359,205 359,205
149
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
357,200 357,200 357,200 357,200
426,050 426,050 426,050 426,050
651,600 651,600 651,600 651,600
150
HARGA HARGA
SATUAN 2013 SATUAN 2012
6 7
151
HARGA HARGA
SATUAN 2013 SATUAN 2012
152
HARGA HARGA
SATUAN 2013 SATUAN 2012
154,250
153
HARGA HARGA
SATUAN 2013 SATUAN 2012
212,950 212,950 -
154
HARGA HARGA
SATUAN 2013 SATUAN 2012
6,050 6,000 - -
8,800 8,800 -
10,550 9,400 - -
88,800
105,750
117,750
584,700 584,700 -
73,900 73,900 -
4,450 4,450 50
155
HARGA HARGA
SATUAN 2013 SATUAN 2012
67,150 67,150 -
33600 33600 -
700,900 700,900 -
357,300 357,300 -
156
HARGA HARGA
SATUAN 2013 SATUAN 2012
589,400 589,400 -
330,700 330,700 -
157
HARGA HARGA
SATUAN 2013 SATUAN 2012
272,100 272,100 -
158
HARGA HARGA
SATUAN 2013 SATUAN 2012
39,050 46,400
58,250 68,950
18,009,150 18,009,150 - -
18,009,150 18,009,150 - -
7,873,350 7,873,350 - -
13,031,500 13,031,500 - -
13,446,700 13,446,700 - -
159
HARGA HARGA
SATUAN 2013 SATUAN 2012
18,009,150 18,009,150 - -
1,404,100
10,200 10,200 - -
160
HARGA HARGA
SATUAN 2013 SATUAN 2012
15,750 15,750 - -
161
HARGA HARGA
SATUAN 2013 SATUAN 2012
162
HARGA HARGA
SATUAN 2013 SATUAN 2012
163
HARGA HARGA
SATUAN 2013 SATUAN 2012
164
HARGA HARGA
SATUAN 2013 SATUAN 2012
670,800 kode urutan Harga Pipa Galvanis Disesuaikan dengan harga 2013
789,700 koreksi link.........ada perubahan
1,046,300
1,474,950
1,789,350
149,850
190,650
248,450
317,500
394,250
529,400
730,200
857,550
1,217,800
1,744,250
2,078,350
3,492,200
152,350
188,100
288,600
372,500
441,850
648,950
836,750
1,036,450
1,499,750
1,940,800
2,345,200
185,150
237,800
364,650
481,250
552,950
754,400
962,300
1,243,100
1,799,700
2,422,000
2,883,350
4,141,600
305,450 305,450 - -
165
HARGA HARGA
SATUAN 2013 SATUAN 2012
357,200 357,200 - -
426,050 426,050 - -
651,600 651,600 - -
51,900 51,900 - -
23,250 23,250 - -
166
- 51 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Pekerjaan Finishing
K Pekerjaan Kusen, Pintu, & Jendela
1 Pasang Kaca Mati tebal 5 mm m2
Tenaga:
Mandor 0.0008 O.H Rp 100,000.00
Kepala Tukang Kayu 0.0150 O.H Rp 95,000.00
Tukang Kayu 0.1500 O.H Rp 90,000.00
Pekerja 0.0150 O.H Rp 70,000.00
Bahan:
Kaca Polos Tebal 5 mm 1.1000 m2 Rp 126,000.00
Sealant 0.0500 kg Rp 10,950.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
2 Pemasangan Kusen Alumunium Profil 4" Putih m1
Tenaga:
Mandor 0.0021 O.H Rp 100,000.00
Kepala Tukang besi 0.0043 O.H Rp 95,000.00
Tukang besi 0.0430 O.H Rp 90,000.00
Pekerja 0.0430 O.H Rp 70,000.00
Bahan:
Profil 4" Putih ( 4 x 10 ) 1.1000 m1 Rp 120,000.00
Skrup/Ripet 2.0000 Buah Rp 350.00
Sealent 0.0600 Botol Rp 10,950.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
L Sanitair
1 Pemasangan Kran Air Model Engkol Buah
Tenaga:
Mandor 0.0050 O.H Rp 100,000.00
Kepala Tukang Pipa 0.0400 O.H Rp 95,000.00
Tukang Pipa 0.4000 O.H Rp 90,000.00
Pekerja 0.0100 O.H Rp 70,000.00
Bahan:
Kran Air merk onda Type CLS 04 / Setara 1.0000 Buah Rp 75,000.00
Seal Tape 0.0250 Biji Rp 3,200.00
- 52 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
2 Pemasangan Kloset Duduk ex. INA komplit Buah
Tenaga:
Mandor 0.1600 O.H Rp 100,000.00
Kepala Tukang batu 0.0100 O.H Rp 95,000.00
Tukang Batu 1.1000 O.H Rp 90,000.00
Pekerja 3.3000 O.H Rp 70,000.00
Bahan:
Kloset Duduk ex. Toto komplit 1.0000 Buah Rp 1,500,000.00
Perlengkapan : 6.0000 % Rp 1,500,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 53 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
3 Pemasangan Wastafel Bahan Keramik Buah
Tenaga:
Mandor 0.0600 O.H Rp 100,000.00
Kepala Tukang batu 0.1500 O.H Rp 95,000.00
Tukang Batu 1.4500 O.H Rp 90,000.00
Pekerja 1.2000 O.H Rp 70,000.00
Bahan:
Wastafel Bahan Keramik 1.0000 Buah Rp 371,400.00
Semen portland 6.0000 Kg Rp 1,212.50
Pasir Pasang 0.0100 m3 Rp 310,000.00
Perlengkapan: 12.0000 % Rp 371,400.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
4 Pemasangan Floor Drain Buah
Tenaga:
Mandor 0.0050 O.H Rp 100,000.00
Kepala Tukang Batu 0.0100 O.H Rp 95,000.00
Tukang Batu 0.1000 O.H Rp 90,000.00
Pekerja 0.0100 O.H Rp 70,000.00
Bahan:
Floor drain 1.0000 Buah Rp 60,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
5 Pemasangan Kran Bebek Fio 10 JC Buah
Tenaga:
Mandor 0.0050 O.H Rp 100,000.00
Kepala Tukang Pipa 0.0400 O.H Rp 95,000.00
Tukang Pipa 0.4000 O.H Rp 90,000.00
Pekerja 0.0100 O.H Rp 70,000.00
Bahan:
Kran Bebek Fio 10 JC 1.0000 Buah Rp 175,000.00
Seal Tape 1.0000 biji Rp 3,200.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 54 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
N Pipa
1 Pekerjaan Besi Pipa Stainless 2 " m1
Bahan:
Besi Pipa Stainless 2 " 1.0000 m1 Rp 108,600.00
Upah:
Ongkos kerja pemasangan + Elektrode 3.2708 m1 Rp 9,570.15
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
2 Pasang Pipa PVC Type AW dia. 3/4" m1
Tenaga:
Mandor 0.0020 O.H Rp 100,000.00
Kepala Tukang Pipa 0.0060 O.H Rp 95,000.00
Tukang Pipa 0.0600 O.H Rp 90,000.00
Pekerja 0.0360 O.H Rp 70,000.00
Bahan:
Pipa PVC AW Dia. 3/4" 1.2000 m1 Rp 7,912.50
Perlengkapan 35.0000 % Rp 7,912.50
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 55 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
3 Pasang Pipa PVC Type AW dia. 1" m1
Tenaga:
Mandor 0.0020 O.H Rp 100,000.00
Kepala Tukang Pipa 0.0060 O.H Rp 95,000.00
Tukang Pipa 0.0600 O.H Rp 90,000.00
Pekerja 0.0360 O.H Rp 70,000.00
Bahan:
Pipa PVC AW dia. 1" 1.2000 m1 Rp 11,530.00
Perlengkapan 35.0000 % Rp 11,530.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
4 Pemasangan Pipa PVC 3" Type D untuk Talang Pembuluh m1
Tenaga:
Pekerja 0.1350 O.H Rp 70,000.00
Bahan:
Pipa PVC 3" Type D 1.0000 m1 Rp 32,370.00
Klem PVC 1.0000 Buah Rp 3,500.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
18 Pemasangan Pipa PVC 4" Type D untuk Talang Pembuluh m1
Tenaga:
Pekerja 0.1350 O.H Rp 70,000.00
Bahan:
Pipa PVC 4" Panjang 4 Mt type D 1.0000 m1 Rp 45,520.00
Klem PVC 1.0000 Buah Rp 3,500.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
O Pengecatan
1 Pengecatan Bidang Kayu Baru 2 Lapis m2
Tenaga:
Mandor 0.0030 O.H Rp 100,000.00
Kepala Tukang Cat 0.0060 O.H Rp 95,000.00
Tukang cat 0.0090 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
- 56 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Bahan:
Plamir 0.1500 Kg Rp 28,500.00
Cat Kayu 0.2600 Kg Rp 61,150.00
Cat meni 0.2000 Kg Rp 29,750.00
Minyak cat 0.0300 Liter Rp 12,350.00
Kertas Gosok 0.2000 Buah Rp 5,000.00
Kuas Cat 0.0100 Buah Rp 8,450.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 57 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
2 Pengecatan Tembok dalam Baru 2 Lapis m2
(Interior Standar)
Tenaga:
Mandor 0.0030 O.H Rp 100,000.00
Kepala Tukang Cat 0.0063 O.H Rp 95,000.00
Tukang cat 0.0630 O.H Rp 90,000.00
Pekerja 0.0200 O.H Rp 70,000.00
Bahan:
Plamir 0.1000 Kg Rp 28,500.00
Kapi 0.0500 Buah Rp 10,550.00
Kertas gosok 0.5000 Lembar Rp 5,000.00
Cat Tembok Interior Standar ( Catylac ) 0.2600 Kg Rp 24,240.00
Roll 0.0100 Buah Rp 23,200.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
3 Pengecatan Tembok luar Baru 2 Lapis (Eksterior) m2
Tenaga:
Mandor 0.0030 O.H Rp 100,000.00
Kepala Tukang Cat 0.0063 O.H Rp 95,000.00
Tukang cat 0.0630 O.H Rp 90,000.00
Pekerja 0.0200 O.H Rp 70,000.00
Bahan:
Cat Tembok Dasar/Alkali 0.1000 Kg Rp 83,115.38
Kuas Cat 0.0500 Buah Rp 8,450.00
Kertas gosok 0.5000 Lembar Rp 5,000.00
Cat Tembok Jotun Eksterior ( Jotashield ) 0.2600 Kg Rp 112,500.00
Roll 0.0100 Buah Rp 23,200.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
P Finishing Dinding
1 Pemasangan Batu Susun Sirih + Finishing m2
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.7000 O.H Rp 70,000.00
- 58 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Bahan:
Semen PC 11.7500 kg Rp 1,212.50
Pasir Pasang 0.0350 m3 Rp 310,000.00
Batu Gilang Asimetris 1.1000 m2 Rp 178,000.00
Coating 1.0000 m2 Rp 77,600.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
Q Instalasi Listrik
1 Pemasangan Titik Stop Kontak Gedung Titik
Tenaga:
Kepala Tukang Listrik 0.0050 O.H Rp 95,000.00
Tukang Listrik 0.5000 O.H Rp 90,000.00
Pekerja 0.0500 O.H Rp 70,000.00
Bahan:
Stop Kontak (broco) 1.0000 buah Rp 20,000.00
Kabel NYA 2,5 mm 15.0000 m1 Rp 10,450.00
Pipa Pralon 5/8 " 0.2000 btg Rp 11,200.00
T Doos Pvc 1.0000 Buah Rp 3,150.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 59 -
HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
2 Pemasangan Titik Lampu Titik
Tenaga:
Kepala Tukang Listrik 0.0050 O.H Rp 95,000.00
Tukang Listrik 0.5000 O.H Rp 90,000.00
Pekerja 0.0500 O.H Rp 70,000.00
Bahan:
L Bow 4.0000 buah Rp 5,500.00
Kabel NYA 2,5 mm 24.0000 m1 Rp 10,450.00
Pipa Pralon 5/8 " 3.0000 btg Rp 11,200.00
T Doos Pvc 3.0000 Buah Rp 3,150.00
Sakelar 1.0000 buah Rp 10,950.00
Las Doof 3.0000 buah Rp 500.00
Klem 24.0000 buah Rp 274.00
Mangkok 1.0000 buah Rp 2,500.00
Fiting Plafon 1.0000 Buah Rp 3,600.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
3 Pemasangan MCB Buah
Tenaga:
Kepala Tukang Listrik 0.0050 O.H Rp 95,000.00
Tukang Listrik 0.5000 O.H Rp 90,000.00
Pekerja 0.0500 O.H Rp 70,000.00
Bahan:
Pipa Pralon 5/8 " 3.0000 btg Rp 11,200.00
Kabel NYA 2,5 mm 15.0000 m1 Rp 10,450.00
T Doos Pvc 1.0000 buah Rp 3,150.00
L Bow 2.0000 buah Rp 5,500.00
Klem 24.0000 buah Rp 274.00
MCB 1.0000 buah Rp 211,400.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 60 -
HARGA
Rp 75.00
Rp 1,425.00
Rp 13,500.00
Rp 1,050.00
Rp 138,600.00
Rp 547.50
Rp 155,197.50
Rp 15,519.75
Rp 170,717.25
Rp 210.00
Rp 408.50
Rp 3,870.00
Rp 3,010.00
Rp 132,000.00
Rp 700.00
Rp 657.00
Rp 140,855.50
Rp 14,085.55
Rp 154,941.05
Rp 500.00
Rp 3,800.00
Rp 36,000.00
Rp 700.00
Rp 75,000.00
Rp 80.00
- 61 -
HARGA
Rp 116,080.00
Rp 11,608.00
Rp 127,688.00
Rp 16,000.00
Rp 950.00
Rp 99,000.00
Rp 231,000.00
Rp 1,500,000.00
Rp 90,000.00
Rp 1,936,950.00
Rp 193,695.00
Rp 2,130,645.00
- 62 -
HARGA
Rp 6,000.00
Rp 14,250.00
Rp 130,500.00
Rp 84,000.00
Rp 371,400.00
Rp 7,275.00
Rp 3,100.00
Rp 44,568.00
Rp 661,093.00
Rp 66,109.30
Rp 727,202.30
Rp 500.00
Rp 950.00
Rp 9,000.00
Rp 700.00
Rp 60,000.00
Rp 71,150.00
Rp 7,115.00
Rp 78,265.00
Rp 500.00
Rp 3,800.00
Rp 36,000.00
Rp 700.00
Rp 175,000.00
Rp 3,200.00
Rp 219,200.00
Rp 21,920.00
Rp 241,120.00
- 63 -
HARGA
Rp 108,600.00
Rp 31,302.05
Rp 139,902.05
Rp 13,990.20
Rp 153,892.25
Rp 200.00
Rp 570.00
Rp 5,400.00
Rp 2,520.00
Rp 9,495.00
Rp 2,769.38
Rp 20,954.38
Rp 2,095.44
Rp 23,049.81
- 64 -
HARGA
Rp 200.00
Rp 570.00
Rp 5,400.00
Rp 2,520.00
Rp 13,836.00
Rp 4,035.50
Rp 26,561.50
Rp 2,656.15
Rp 29,217.65
Rp 9,450.00
Rp 32,370.00
Rp 3,500.00
Rp 45,320.00
Rp 4,532.00
Rp 49,852.00
Rp 9,450.00
Rp 45,520.00
Rp 3,500.00
Rp 58,470.00
Rp 5,847.00
Rp 64,317.00
Rp 300.00
Rp 570.00
Rp 810.00
Rp 4,900.00
- 65 -
HARGA
Rp 4,275.00
Rp 15,899.00
Rp 5,950.00
Rp 370.50
Rp 1,000.00
Rp 84.50
Rp 34,159.00
Rp 3,415.90
Rp 37,574.90
- 66 -
HARGA
Rp 300.00
Rp 598.50
Rp 5,670.00
Rp 1,400.00
Rp 2,850.00
Rp 527.50
Rp 2,500.00
Rp 6,302.40
Rp 232.00
Rp 20,380.40
Rp 2,038.04
Rp 22,418.44
Rp 300.00
Rp 598.50
Rp 5,670.00
Rp 1,400.00
Rp 8,311.54
Rp 422.50
Rp 2,500.00
Rp 29,250.00
Rp 232.00
Rp 48,684.54
Rp 4,868.45
Rp 53,552.99
Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 49,000.00
- 67 -
HARGA
Rp 14,246.88
Rp 10,850.00
Rp 195,800.00
Rp 77,600.00
Rp 385,821.88
Rp 38,582.19
Rp 424,404.06
Rp 475.00
Rp 45,000.00
Rp 3,500.00
Rp 20,000.00
Rp 156,750.00
Rp 2,240.00
Rp 3,150.00
Rp 231,115.00
Rp 23,111.50
Rp 254,226.50
- 68 -
HARGA
Rp 475.00
Rp 45,000.00
Rp 3,500.00
Rp 22,000.00
Rp 250,800.00
Rp 33,600.00
Rp 9,450.00
Rp 10,950.00
Rp 1,500.00
Rp 6,576.00
Rp 2,500.00
Rp 3,600.00
Rp 389,951.00
Rp 38,995.10
Rp 428,946.10
Rp 475.00
Rp 45,000.00
Rp 3,500.00
Rp 33,600.00
Rp 156,750.00
Rp 3,150.00
Rp 11,000.00
Rp 6,576.00
Rp 211,400.00
Rp 471,451.00
Rp 47,145.10
Rp 518,596.10
- 74 -
INFRASTRUKTUR JALAN
R Perkerasan Paving
2 Pemasangan Paving Stone (Blok) Tbl.6 cm ( Lokal Kw 1) m2
+ Pasir Urug tbl 5cm
Tenaga:
Mandor 0.0013 O.H
Kepala Tukang Batu 0.0500 O.H
Tukang Batu 0.5000 O.H
Pekerja 0.2500 O.H
Bahan:
Paving Stone Abu-2 Tb 6 Cm ( Lokal Kw 1 ) 1.0100 m2
Pasir Urug 0.0500 m3
Peralatan
Peralatan 10.0000 %
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
3 Pemasangan Paving Block Tbl.6 cm Abu-abu + Pasir Urug m2
tbl 5cm
Tenaga:
Mandor 0.0013 O.H
Kepala Tukang Batu 0.0500 O.H
Tukang Batu 0.5000 O.H
Pekerja 0.2500 O.H
Bahan:
Paving block uk. 21.21.6 Abu-abu / corso K 300 1.0100 m2
Setara ex. Focon
Pasir Urug 0.0500 m3
Peralatan
Peralatan 10.0000 %
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
4 Pemasangan Paving Block Tbl.8 cm Abu-abu + Pasir Urug m2
tbl 10cm
Tenaga:
Mandor 0.0013 O.H
Kepala Tukang Batu 0.0500 O.H
- 75 -
Peralatan 10.0000 %
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
Pemasangan Grass Block, t = 6 cm m2
Tenaga:
Mandor 0.0250 O.H
Kepala Tukang Batu 0.0250 O.H
Tukang Batu 0.2500 O.H
Pekerja 0.7500 O.H
Bahan:
Grass Block Tb 6 Cm 1.0500 m2
(3 Berlian-DT 1) Nilai HSPK :
7 Pemasangan Grass Block uk. 21.5 cm x 42 cm, t = 10 cm m2
Tenaga:
Mandor 0.0013 O.H
Kepala Tukang Batu 0.0500 O.H
Tukang Batu 0.5000 O.H
Pekerja 0.2500 O.H
Bahan:
Grass Block Tb 10 Cm setara ex. Focon 1.0500 m2
Penanaman Rumput 0.2891 m2
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
8 Kanstin Trap uk. t= 20, l=10 m1
Tenaga:
Mandor 0.0010 O.H
Kepala Tukang Batu 0.0100 O.H
Tukang Batu 0.0500 O.H
Pekerja 0.1000 O.H
Bahan:
Semen PC (portland Cement) 0.0474336 zak
Pasir Pasang 0.0061763 m3
Kanstin Trap uk. 10.20.40 setara ex. Focon 2.7500 bh
Jumlah
Overhead + Profit ( 10 % )
- 77 -
Nilai HSPK :
9 Kanstin Trap uk. t= 30, l=15/20 m1
Tenaga:
Mandor 0.0010 O.H
Kepala Tukang Batu 0.0100 O.H
Tukang Batu 0.1000 O.H
Pekerja 0.2000 O.H
Bahan:
Semen PC (portland Cement) 0.0638 zak
Pasir Pasang 0.0020 m3
Kanstin Trap uk. 15/20.30.50 Setara ex. Focon 2.2000 bh
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
10 Stopper/Uskup m1
Tenaga:
Mandor 0.0010 O.H
Kepala Tukang Batu 0.0100 O.H
Tukang Batu 0.0500 O.H
Pekerja 0.0500 O.H
Bahan:
Pasir Pasang 0.0010 m3
Stopper/uskup 3.3400 Buah
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
Stopper/Uskup tebal 8 cm m1
Tenaga:
Mandor 0.0010 O.H
Kepala Tukang Batu 0.0100 O.H
Tukang Batu 0.1000 O.H
Pekerja 0.2000 O.H
Bahan:
Pasir Pasang 0.0010 m3
Stopper/uskup 3.3400 Buah
Nilai HSPK :
- 78 -
Tenaga:
Mandor 0.0167 O.H
Operator Terampil 0.0500 O.H
Operator Kurang Terampil 0.0333 O.H
Sopir Terampil 0.0667 O.H
Pekerja / Buruh Tak Terampil 0.0667 O.H
Pekerja / Buruh Semi Terampil 0.0667 O.H
- 79 -
Bahan:
Kerikil Sungai 1.3333 m3
Peralatan:
Sewa alat bantu 0.0417 Jam
Bulldozer 110 HP 0.1000 Jam
Mesin Pecah Batu 200 HP 0.1000 Jam
Wheel Loader 80 HP 0.1000 Jam
Dumptruck 8 - 10 m3 0.4000 Jam
Nilai HSPK :
Produksi dan Suplai Aspal Beton U/Lapis Pondasi Atas TON
(LASTON ATAS) dg Alat.
Tenaga:
Mandor 0.0100 O.H
Operator Terampil 0.0300 O.H
Pembantu Operator 0.0300 O.H
Sopir Terampil 0.0400 O.H
Pembantu Sopir 0.0400 O.H
Pekerja / Buruh Tak Terampil 0.0600 O.H
Pekerja / Buruh Terampil 0.0300 O.H
Bahan:
Pasir Beton 0.2400 m3
Aspal Curah 60.000 Kg
Portland Cement (40 Kg) 0.3700 Zak
Kapur Pasang 0.0200 m3
Kerikil Pecah tersaring 0.3100 m3
Peralatan:
Sewa alat bantu 0.0024 Unit
Wheel Loader 115 HP 0.0500 Jam
Mesin Pencampur Aspal 0.0500 Jam
Dumptruck 8 - 10 m3 0.2400 Jam
Nilai HSPK :
Produksi dan Suplai Lapis Tipis Aspal Beton (LATASTON ) TON
dg Alat/Mesin.
Tenaga:
Mandor 0.0100 O.H
Operator Terampil 0.0300 O.H
Pembantu Operator 0.0300 O.H
Sopir Terampil 0.0400 O.H
- 80 -
Tenaga:
Mandor 0.0222 O.H
Operator Terampil 0.0889 O.H
Pembantu Operator 0.0889 O.H
- 84 -
Tenaga:
Mandor 0.0004 O.H
Operator Terampil 0.0008 O.H
Sopir Terampil 0.0008 O.H
Pekerja / Buruh Tak Terampil 0.0042 O.H
Pekerja / Buruh Semi Terampil 0.0008 O.H
Pekerja / Buruh Terampil 0.0008 O.H
Bahan:
Pasir Beton 0.0179 m3
Aspal 1.2083 Kg
Minyak Bakar 0.1250 Ltr
Peralatan:
Sewa alat bantu 0.0002 Unit
Mesin Gilas 3 Roda 8-10 T 0.0021 Jam
Mesin Penyemprot Aspal 200 L 0.0021 Jam
Dumptruck 8 - 10 m3 0.0042 Jam
Nilai HSPK :
Laburan Aspal Satu Lapis (BURTU) Menggunakan Alat m2
Tenaga:
Mandor 0.0011 O.H
- 85 -
Tenaga:
- 86 -
Nilai HSPK :
Pelapisan Ulang atau Penetrasi Makadam m3
7 cm LPA Menggunakan Buruh
Tenaga:
Mandor 0.0857 O.H
Operator Terampil 0.0857 O.H
Sopir Terampil 0.0429 O.H
Pekerja / Buruh Tak Terampil 2.8286 O.H
Pekerja / Buruh Terampil 0.0857 O.H
Bahan:
Batu Pecah 3-5cm 0.8857 m3
Batu Pecah 2-3 cm 0.2371 m3
Batu Pecah 1-2 cm 0.2029 m3
Pasir Beton 0.1586 m3
Aspal 78.571 Kg
Peralatan:
Sewa alat bantu 0.1143 Unit
Mesin Gilas 3 Roda 8-10 T 0.2143 Jam
Mesin Penyemprot Aspal 200 L 0.2143 Jam
Dumptruck 3 - 4 m3 0.2143 Jam
Nilai HSPK :
Menghampar Lapis Permukaan Aspal Beton (LASTON) m2
Menggunakan Alat
Tenaga:
Mandor 0.0011 O.H
Operator Terampil 0.0056 O.H
Pembantu Operator 0.0056 O.H
Pekerja / Buruh Tak Terampil 0.0167 O.H
Pekerja / Buruh Terampil 0.0111 O.H
Bahan:
Pasir Beton 0.0010 m3
Aspal 0.4000 Kg
Minyak Bakar 0.1000 Ltr
Campuran Laston 0.1111 Ton
Peralatan:
Sewa alat bantu 0.0005 Set
Mesin Gilas 3 Roda 8-10 T 0.0056 Jam
Mesin Gilas Tandem 6-10 Ton 0.0056 Jam
- 88 -
Tenaga:
Mandor 0.0172 OH
Tukang Batu 0.0687 OH
Pekerja / Buruh tak terampil 0.1380 OH
Bahan:
Beton K-175 0.0338 m3
Baja Tulangan 4.2188 Kg
Cat Avian 0.5000 Kg
Peralatan:
Dumptruck 3 - 4 m3 0.1207 Jam
Alat bantu 0.0005 Unit
Nilai HSPK :
Galian Batu ( Patching Aspal ) m3
Tenaga:
Mandor 0.0500 OH
Pekerja / Buruh tak terampil 1.5000 OH
Peralatan:
Compressor 0.1350 Jam
Jack Hammer 0.0500 Unit/hari
Alat bantu 0.0300 Unit
Nilai HSPK :
- 89 -
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 130.00
Rp 95,000.00 Rp 4,750.00
Rp 90,000.00 Rp 45,000.00
Rp 70,000.00 Rp 17,500.00
Rp 65,000.00 Rp 65,650.00
Rp 134,150.00 Rp 6,707.50
Rp 72,357.50 Rp 7,235.75
Jumlah Rp 146,973.25
Overhead + Profit ( 10 % ) Rp 14,697.33
Nilai HSPK : Rp 161,670.58
Rp 100,000.00 Rp 130.00
Rp 95,000.00 Rp 4,750.00
Rp 90,000.00 Rp 45,000.00
Rp 70,000.00 Rp 17,500.00
Rp 96,800.00 Rp 97,768.00
Rp 134,150.00 Rp 6,707.50
Rp 104,475.50 Rp 10,447.55
Jumlah Rp 182,303.05
Overhead + Profit ( 10 % ) Rp 18,230.31
Nilai HSPK : Rp 200,533.36
Rp 100,000.00 Rp 130.00
Rp 95,000.00 Rp 4,750.00
- 90 -
HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 45,000.00
Rp 70,000.00 Rp 17,500.00
Rp 115,500.00 Rp 116,655.00
Rp 134,150.00 Rp 13,415.00
Rp 130,070.00 Rp 13,007.00
Jumlah Rp 210,457.00
Overhead + Profit ( 10 % ) Rp 21,045.70
Nilai HSPK : Rp 231,502.70
Rp 100,000.00 Rp 130.00
Rp 95,000.00 Rp 4,750.00
Rp 90,000.00 Rp 45,000.00
Rp 70,000.00 Rp 17,500.00
Rp 108,800.00 Rp 109,888.00
Rp 134,150.00 Rp 6,707.50
Rp 116,595.50 Rp 11,659.55
Jumlah Rp 195,635.05
Overhead + Profit ( 10 % ) Rp 19,563.51
Nilai HSPK : Rp 215,198.56
Rp 100,000.00 Rp 130.00
Rp 95,000.00 Rp 4,750.00
Rp 90,000.00 Rp 45,000.00
Rp 70,000.00 Rp 17,500.00
Rp 143,000.00 Rp 144,430.00
Rp 134,150.00 Rp 13,415.00
- 91 -
HARGA
HARGA
SATUAN
Rp 157,845.00 Rp 15,784.50
Jumlah Rp 241,009.50
Overhead + Profit ( 10 % ) Rp 24,100.95
Nilai HSPK : Rp 265,110.45
Rp 100,000.00 Rp 2,500.00
Rp 95,000.00 Rp 2,375.00
Rp 90,000.00 Rp 22,500.00
Rp 70,000.00 Rp 52,500.00
Rp 137,777.78 Rp 144,666.67
Nilai HSPK : Rp 224,541.67
Rp 100,000.00 Rp 130.00
Rp 95,000.00 Rp 4,750.00
Rp 90,000.00 Rp 45,000.00
Rp 70,000.00 Rp 17,500.00
Rp 143,000.00 Rp 150,150.00
Rp 45,952.50 Rp 13,284.87
Jumlah Rp 230,814.87
Overhead + Profit ( 10 % ) Rp 23,081.49
Nilai HSPK : Rp 253,896.35
Rp 100,000.00 Rp 100.00
Rp 95,000.00 Rp 950.00
Rp 90,000.00 Rp 4,500.00
Rp 70,000.00 Rp 7,000.00
Rp 48,500.00 Rp 2,300.53
Rp 310,000.00 Rp 1,914.64
Rp 25,820.00 Rp 71,005.00
Jumlah Rp 87,770.17
Overhead + Profit ( 10 % ) Rp 8,777.02
- 92 -
HARGA
HARGA
SATUAN
Nilai HSPK : Rp 96,547.18
Rp 100,000.00 Rp 100.00
Rp 95,000.00 Rp 950.00
Rp 90,000.00 Rp 9,000.00
Rp 70,000.00 Rp 14,000.00
Rp 48,500.00 Rp 3,092.36
Rp 310,000.00 Rp 613.80
Rp 58,600.00 Rp 128,920.00
Jumlah Rp 156,676.16
Overhead + Profit ( 10 % ) Rp 15,667.62
Nilai HSPK : Rp 172,343.78
Rp 100,000.00 Rp 100.00
Rp 95,000.00 Rp 950.00
Rp 90,000.00 Rp 4,500.00
Rp 70,000.00 Rp 3,500.00
Rp 310,000.00 Rp 310.00
Rp 3,075.00 Rp 10,270.50
Jumlah Rp 19,630.50
Overhead + Profit ( 10 % ) Rp 1,963.05
Nilai HSPK : Rp 21,593.55
Rp 100,000.00 Rp 100.00
Rp 95,000.00 Rp 950.00
Rp 90,000.00 Rp 9,000.00
Rp 70,000.00 Rp 14,000.00
Rp 310,000.00 Rp 310.00
Rp 3,075.00 Rp 10,270.50
Nilai HSPK : Rp 34,630.50
- 93 -
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 625.00
Rp 90,000.00 Rp 1,125.00
Rp 90,000.00 Rp 4,500.00
Rp 67,500.00 Rp 421.88
Rp 175,000.00 Rp 175,000.00
Rp 98,400.00 Rp 246.00
Rp 313,250.00 Rp 5,873.44
Rp 454,400.00 Rp 17,040.00
Rp 56,666.67 Rp 17,000.00
Nilai HSPK : Rp 221,831.31
Rp 100,000.00 Rp 3,333.33
Rp 90,000.00 Rp 9,000.00
Rp 67,500.00 Rp 67,500.00
Rp 175,000.00 Rp 175,000.00
Rp 98,400.00 Rp 4,100.00
Rp 46,666.67 Rp 28,000.00
Nilai HSPK : Rp 286,933.33
Rp 100,000.00 Rp 1,666.67
Rp 90,000.00 Rp 4,500.00
Rp 75,000.00 Rp 2,500.00
Rp 90,000.00 Rp 6,000.00
Rp 67,500.00 Rp 4,500.00
Rp 65,000.00 Rp 4,333.33
- 94 -
HARGA
HARGA
SATUAN
Rp 98,300.00 Rp 131,066.67
Rp 98,400.00 Rp 4,100.00
Rp 313,250.00 Rp 31,325.00
Rp 716,450.00 Rp 71,645.00
Rp 454,400.00 Rp 45,440.00
Rp 56,666.67 Rp 22,666.67
Nilai HSPK : Rp 329,743.33
Rp 100,000.00 Rp 1,000.00
Rp 90,000.00 Rp 2,700.00
Rp 90,000.00 Rp 2,700.00
Rp 90,000.00 Rp 3,600.00
Rp 78,800.00 Rp 3,152.00
Rp 67,500.00 Rp 4,050.00
Rp 70,000.00 Rp 2,100.00
Rp 302,000.00 Rp 72,480.00
Rp 13,800.00 Rp 828,000.00
Rp 46,800.00 Rp 17,316.00
Rp - Rp -
Rp 329,743.33 Rp 102,220.43
Rp 98,400.00 Rp 236.16
Rp 454,400.00 Rp 22,720.00
Rp 5,980,000.00 Rp 299,000.00
Rp 56,666.67 Rp 13,600.00
Nilai HSPK : Rp 1,374,874.59
Rp 100,000.00 Rp 1,000.00
Rp 90,000.00 Rp 2,700.00
Rp 90,000.00 Rp 2,700.00
Rp 90,000.00 Rp 3,600.00
- 95 -
HARGA
HARGA
SATUAN
Rp 78,800.00 Rp 3,152.00
Rp 67,500.00 Rp 4,050.00
Rp 70,000.00 Rp 2,100.00
Rp 302,000.00 Rp 93,620.00
Rp 13,800.00 Rp 1,007,400.00
Rp 46,800.00 Rp 42,120.00
Rp - Rp -
Rp 329,743.33 Rp 74,192.25
Rp 98,400.00 Rp 236.16
Rp 454,400.00 Rp 22,720.00
Rp 5,980,000.00 Rp 299,000.00
Rp 56,666.67 Rp 13,600.00
Nilai HSPK : Rp 1,572,190.41
Rp 100,000.00 Rp 1,000.00
Rp 90,000.00 Rp 2,700.00
Rp 90,000.00 Rp 2,700.00
Rp 90,000.00 Rp 3,600.00
Rp 78,800.00 Rp 3,152.00
Rp 67,500.00 Rp 4,050.00
Rp 70,000.00 Rp 2,100.00
Rp 302,000.00 Rp 81,540.00
Rp 13,800.00 Rp 966,000.00
Rp 46,800.00 Rp 46,800.00
Rp 329,743.33 Rp 90,679.42
Rp 98,400.00 Rp 236.16
Rp 454,400.00 Rp 22,720.00
Rp 5,980,000.00 Rp 299,000.00
Rp 56,666.67 Rp 13,600.00
Nilai HSPK : Rp 1,539,877.58
- 96 -
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 1,851.85
Rp 90,000.00 Rp 3,333.33
Rp 65,000.00 Rp 43,333.33
Rp 98,400.00 Rp 2,733.33
Rp 46,666.67 Rp 8,641.98
Nilai HSPK : Rp 59,893.83
Rp 100,000.00 Rp 3,333.33
Rp 90,000.00 Rp 1,500.00
Rp 90,000.00 Rp 1,500.00
Rp 90,000.00 Rp 1,500.00
Rp 78,800.00 Rp 1,313.33
Rp 65,000.00 Rp 65,000.00
Rp 75,000.00 Rp 90,000.00
Rp 98,400.00 Rp 3,936.00
Rp 348,700.00 Rp 29,058.33
Rp 108,281.25 Rp 9,023.44
Nilai HSPK : Rp 206,164.44
Rp 100,000.00 Rp 500.00
Rp 90,000.00 Rp 450.00
Rp 65,000.00 Rp 1,300.00
Rp 67,500.00 Rp 675.00
Rp 221,831.31 Rp 277,289.14
Rp 98,400.00 Rp 3,936.00
Rp 454,400.00 Rp 11,360.00
Rp 59,400.00 Rp 2,970.00
Nilai HSPK : Rp 298,480.14
- 97 -
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 2,083.33
Rp 90,000.00 Rp 7,500.00
Rp 65,000.00 Rp 54,166.67
Rp 98,400.00 Rp 3,280.00
Rp 46,666.67 Rp 19,444.44
Nilai HSPK : Rp 86,474.44
Rp 100,000.00 Rp 3,333.33
Rp 90,000.00 Rp 1,500.00
Rp 90,000.00 Rp 1,500.00
Rp 65,000.00 Rp 71,500.00
Rp 236,200.00 Rp 39,366.67
Rp 252,950.00 Rp 46,374.17
Rp 262,900.00 Rp 32,862.50
Rp 258,700.00 Rp 47,428.33
Rp 134,250.00 Rp 72,718.75
Rp 98,400.00 Rp 1,968.00
Rp 160,000.00 Rp 13,333.33
Rp 108,281.25 Rp 7,218.75
Rp 348,700.00 Rp 29,058.33
Nilai HSPK : Rp 368,162.17
Rp 100,000.00 Rp 5,000.00
Rp 90,000.00 Rp 1,500.00
Rp 90,000.00 Rp 1,500.00
Rp 65,000.00 Rp 65,000.00
Rp 112,000.00 Rp 140,000.00
Rp 98,400.00 Rp 4,100.00
Rp 160,000.00 Rp 13,333.33
- 98 -
HARGA
HARGA
SATUAN
Rp 108,281.25 Rp 9,023.44
Nilai HSPK : Rp 239,456.77
Rp 100,000.00 Rp 3,750.00
Rp 90,000.00 Rp 1,125.00
Rp 65,000.00 Rp 80,437.50
Rp 139,850.00 Rp 156,632.00
Rp 181,200.00 Rp 45,300.00
Rp 134,250.00 Rp 50,343.75
Rp 98,400.00 Rp 4,920.00
Rp 167,850.00 Rp 10,490.63
Nilai HSPK : Rp 352,998.88
Rp 100,000.00 Rp 1,666.67
Rp 90,000.00 Rp 1,500.00
Rp 90,000.00 Rp 1,500.00
Rp 65,000.00 Rp 71,500.00
Rp 134,250.00 Rp 16,781.25
Rp 329,743.33 Rp 412,179.17
Rp 98,400.00 Rp 4,510.00
Rp 313,800.00 Rp 26,150.00
Rp 108,281.25 Rp 9,023.44
Nilai HSPK : Rp 544,810.52
Rp 100,000.00 Rp 2,222.22
Rp 90,000.00 Rp 8,000.00
Rp 90,000.00 Rp 8,000.00
- 99 -
HARGA
HARGA
SATUAN
Rp 65,000.00 Rp 17,333.33
Rp 70,000.00 Rp 12,444.44
Rp 1,374,874.59 Rp 3,055,276.87
Rp 302,000.00 Rp 4,026.67
Rp 13,800.00 Rp 55,200.00
Rp - Rp -
Rp 98,400.00 Rp 1,049.60
Rp 120,000.00 Rp 13,333.33
Rp 348,700.00 Rp 38,744.44
Rp 54,600.00 Rp 3,640.00
Rp 371,150.00 Rp 41,238.89
Rp 186,850.00 Rp 16,608.89
Nilai HSPK : Rp 3,277,118.70
Rp 100,000.00 Rp 41.67
Rp 90,000.00 Rp 75.00
Rp 90,000.00 Rp 75.00
Rp 65,000.00 Rp 270.83
Rp 67,500.00 Rp 56.25
Rp 70,000.00 Rp 58.33
Rp 302,000.00 Rp 5,410.83
Rp 13,800.00 Rp 16,675.00
Rp - Rp -
Rp 98,400.00 Rp 20.50
Rp 120,000.00 Rp 250.00
Rp 41,000.00 Rp 85.42
Rp 56,666.67 Rp 236.11
Nilai HSPK : Rp 23,254.94
Rp 100,000.00 Rp 111.11
- 100 -
HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 200.00
Rp 90,000.00 Rp 200.00
Rp 90,000.00 Rp 100.00
Rp 78,800.00 Rp 87.56
Rp 65,000.00 Rp 866.67
Rp 70,000.00 Rp 155.56
Rp 329,743.33 Rp 5,495.72
Rp 13,800.00 Rp 27,753.33
Rp - Rp -
Rp 98,400.00 Rp 52.48
Rp 120,000.00 Rp 1,333.33
Rp 41,000.00 Rp 455.56
Rp 56,666.67 Rp 629.63
Nilai HSPK : Rp 37,440.94
Rp 100,000.00 Rp 166.67
Rp 90,000.00 Rp 300.00
Rp 90,000.00 Rp 300.00
Rp 90,000.00 Rp 150.00
Rp 78,800.00 Rp 131.33
Rp 65,000.00 Rp 1,300.00
Rp 70,000.00 Rp 233.33
Rp 329,743.33 Rp 8,793.16
Rp 13,800.00 Rp 44,083.33
Rp - Rp -
Rp 98,400.00 Rp 78.72
Rp 120,000.00 Rp 1,333.33
Rp 41,000.00 Rp 455.56
Rp 56,666.67 Rp 629.63
Nilai HSPK : Rp 57,955.06
- 101 -
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 428.57
Rp 90,000.00 Rp 385.71
Rp 90,000.00 Rp 192.86
Rp 65,000.00 Rp 9,192.86
Rp 70,000.00 Rp 300.00
Rp 236,200.00 Rp 9,448.00
Rp 252,950.00 Rp 3,920.73
Rp 262,900.00 Rp 2,918.19
Rp 258,700.00 Rp 1,707.42
Rp 302,000.00 Rp 755.00
Rp 13,800.00 Rp 61,804.29
Rp - Rp -
Rp 98,400.00 Rp 569.31
Rp 120,000.00 Rp 1,285.71
Rp 41,000.00 Rp 439.29
Rp 46,666.67 Rp 500.00
Nilai HSPK : Rp 93,847.94
Rp 100,000.00 Rp 66.67
Rp 90,000.00 Rp 240.00
Rp 90,000.00 Rp 240.00
Rp 65,000.00 Rp 520.00
Rp 70,000.00 Rp 373.33
Rp 1,572,190.41 Rp 104,812.69
Rp 13,800.00 Rp 5,520.00
Rp - Rp -
Rp 98,400.00 Rp 31.49
Rp 389,150.00 Rp 1,297.17
Rp 348,700.00 Rp 1,162.33
Rp 41,000.00 Rp 136.67
Rp 371,150.00 Rp 1,237.17
Rp 186,850.00 Rp 498.27
- 102 -
HARGA
HARGA
SATUAN
Nilai HSPK : Rp 116,135.78
Rp 100,000.00 Rp 8,571.43
Rp 90,000.00 Rp 7,714.29
Rp 90,000.00 Rp 3,857.14
Rp 65,000.00 Rp 183,857.14
Rp 70,000.00 Rp 6,000.00
Rp 236,200.00 Rp 209,205.71
Rp 252,950.00 Rp 59,985.29
Rp 262,900.00 Rp 53,331.14
Rp 302,000.00 Rp 47,888.57
Rp 13,800.00 Rp 1,084,285.71
Rp 98,400.00 Rp 11,245.71
Rp 120,000.00 Rp 25,714.29
Rp 41,000.00 Rp 8,785.71
Rp 46,666.67 Rp 10,000.00
Nilai HSPK : Rp 1,720,442.14
Rp 100,000.00 Rp 111.11
Rp 90,000.00 Rp 500.00
Rp 90,000.00 Rp 500.00
Rp 65,000.00 Rp 1,083.33
Rp 70,000.00 Rp 777.78
Rp 302,000.00 Rp 302.00
Rp 13,800.00 Rp 5,520.00
Rp - Rp -
Rp 1,539,877.58 Rp 171,097.51
Rp 98,400.00 Rp 52.48
Rp 120,000.00 Rp 666.67
Rp 389,150.00 Rp 2,161.94
- 103 -
HARGA
HARGA
SATUAN
Rp 348,700.00 Rp 1,937.22
Rp 41,000.00 Rp 136.67
Rp 371,150.00 Rp 2,061.94
Rp 186,850.00 Rp 830.44
Nilai HSPK : Rp 187,739.10
Rp 100,000.00 Rp 1,720.00
Rp 90,000.00 Rp 6,183.00
Rp 65,000.00 Rp 8,970.00
Err:509 Err:509
Rp 10,500.00 Rp 44,297.40
Rp 25,200.00 Rp 12,600.00
Rp 46,666.67 Rp 5,632.67
Rp 98,400.00 Rp 49.20
Nilai HSPK : Err:509
Rp 100,000.00 Rp 5,000.00
Rp 65,000.00 Rp 97,500.00
Rp 115,500.00 Rp 15,592.50
Rp 86,650.00 Rp 4,332.50
Rp 98,400.00 Rp 2,952.00
Nilai HSPK : Rp 125,377.00
- 77 -
Koef. SATUAN
NOMOR URAIAN KEGIATAN
S Pertamanan
1 Penanaman Semak Hias m2
Tenaga:
Mandor 0.0100 O.H
Pekerja 0.3300 O.H
Bahan:
Semak Hias 1.0000m2
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
2 Menanam Rumput Jepang termasuk Perawatannya m2
Tenaga:
Mandor 0.0100 O.H
Pekerja 0.1500 O.H
Bahan:
Rumput Jepang 1.0000 m2
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
3 Penanaman Pohon Pucuk Merah Tinggi 1 m Batang
Tenaga:
Mandor 0.0200 O.H
Tukang Tanam 0.4000 O.H
Bahan:
Pucuk Merah tinggi 1 m 1.0000 Btg
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
4 Penanaman Taiwan Beauty Putih m1
Tenaga:
Mandor 0.0020 O.H
Tukang Tanam 0.0660 O.H
Bahan:
Taiwan Beauty Putih 10.0000 Btg
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 78 -
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 1,000.00
Rp 70,000.00 Rp 23,100.00
Rp 50,000.00 Rp 50,000.00
Jumlah Rp 74,100.00
Overhead + Profit ( 10 % ) Rp 7,410.00
Nilai HSPK : Rp 81,510.00
Rp 100,000.00 Rp 1,000.00
Rp 70,000.00 Rp 10,500.00
Rp 25,000.00 Rp 25,000.00
Jumlah Rp 36,500.00
Overhead + Profit ( 10 % ) Rp 3,650.00
Nilai HSPK : Rp 40,150.00
Rp 100,000.00 Rp 2,000.00
Rp 70,000.00 Rp 28,000.00
Rp 50,000.00 Rp 50,000.00
Jumlah Rp 80,000.00
Overhead + Profit ( 10 % ) Rp 8,000.00
Nilai HSPK : Rp 88,000.00
Rp 100,000.00 Rp 200.00
Rp 70,000.00 Rp 4,620.00
Rp 5,500.00 Rp 55,000.00
Jumlah Rp 59,820.00
Overhead + Profit ( 10 % ) Rp 5,982.00
Nilai HSPK : Rp 65,802.00
DAFTAR HARGA BAHAN KONSTRUKSI YANG DISURVEI
NO URAIAN KETERANGAN
1 Bata Merah
2 Batu Kali Batu Belah Pondasi ( 15/20)
3 Batu Split Pecah Mesin 1/2
4 Batu Split Pecah Mesin 2/3
5 Batu Split Pecah Mesin 3/5
6 Pasir Beton
7 Pasir Pasang
8 Pasir Urug
9 Tanah Urug
10 Tanah Tanam
11 Semen ( 50 Kg ) Gresik
12 Semen ( 50 Kg ) Holcim
13 Semen ( 40 Kg ) Gresik
14 Semen ( 40 Kg ) Holcim
15 Semen Warna
16 Besi Beton Polos
17 Besi Beon Ulir
18 Kawat Beton
19 Rangka Atap Baja Ringan Smart Truss
20 Rangka Atap Baja Ringan Kencana
21 Baja WF
22 Kanal C
23 Plat Siku
24 Plat Strip
25 Besi Hollow Galvalume 4 x 4 Panjang 6m
26 Besi Hollow Galvalume 2 x 4 Panjang 6m
27 Besi Hollow Galvalume 4 x 4 Panjang 4m
28 Besi Hollow Galvalume 2 x 4 Panjang 4m
29 Pipa Besi Hollow Kotak 3 x 3, panjang 6 m
30 Pipa Besi Hollow Kotak 2 x 4, panjang 6 m
31 Pipa Besi Hollow Kotak 4 x 4, panjang 6 m
32 Pipa Besi Hollow Kotak 5 x 5, panjang 6 m
33 Pipa Besi Hollow Kotak 6 x 6, panjang 6 m
34 Pipa Besi Hollow Kotak 7 x 7, panjang 6 m
35 Besi Wiremesh M6, Uk. 2,1 x 5,4 m
36 Baja Ringan Zincalum, C75 - 1mm
37 Baja Ringan Zincalum, C75 - 0.75mm
38 Baja Ringan Zincalum, Reng TS 40.048
39 Genteng Kodok Ex. Trenggalek
40 Genteng Kodok Ex. Karangpilang
41 Genteng Beton Ex. Cisangkan
42 Genteng Keramik
43 Genteng Glassur
44 Wuwungan Ex. Trenggalek
NO URAIAN KETERANGAN
45 Wuwungan Ex. Karangpilang
46 Wuwungan Ex. Cisangkan
47 Wuwungan Keramik
48 Wuwungan Glassur
49 Penutup AtapZincalum Tebal = 0,3 mm
50 Penutup AtapZincalum Tebal = 0,35 mm
51 Penutup AtapZincalum Tebal = 0,4 mm
52 Aluminum Karet Kusen Aluminium
53 Aluminum Profil 3" Coklat ( 3 x 7.5 )
54 Aluminum Profil 3" Putih ( 3 x 7.5 )
55 Aluminum Profil 4" Coklat ( 4 x 10 )
56 Aluminum Profil 4" Putih ( 4 x 10 )
57 Aluminum Slimar 3/8" Jendela
58 Allumunium Foil Bubble, Double Side Medium t = 4mm
59 Allumunium Foil Tape 48 mm x 45 m
60 Amplas Halus Feting 0 s/d 3
61 Amplas Kasar Fujistar 0 s/d 1000
62 Asbes Gel Besar Tbl 6 mm; 1.80x1.05 m
63 Asbes Gel Besar Tbl 4 mm ; 3 x 1.05 m
64 Asbes Gel Besar Tbl 5 mm ; 3 x 1.10 m
65 Asbes Gel Besar Tbl 6 mm; 2.10x1.05 m
66 Asbes Gel Besar Tbl 6 mm; 2.40x1.05 m
67 Asbes Gel Besar Tbl 6 mm; 2.70x1.05 m
68 Asbes Gel. Besar Tbl 6 mm ; 3 x 1.05 m
69 Asbes Gel Kecil Tbl 4 mm; 1.80x1.05 m
70 Asbes Gel Kecil Tbl 4 mm; 2.10x1.05 m
71 Asbes Gel Kecil Tbl 4 mm; 2.40x1.05 m
72 Asbes Gel Kecil Tbl 4 mm; 2.70x1.05 m
73 Asbes Gel Kecil Tbl 4 mm; 3.00x1.05 m
74 Asbes Gel Kecil Tbl 5 mm; 3.05x1.05 m
75 Asbes Datar uk. 100 x 100 x 0.3Cm
76 Asbes Gel. Besar Tbl 5 mm ; 2.5 x 1.10
77 Asbes Gel. Kecil Tbl 4 mm ; 1.5 x 1.05
78 Asbes Gel. Kecil Tbl 5 mm ; 1.8 x 0.92
79 Asbes Gel. Kecil Tbl 5 mm ; 2.00 x 0.92
80 Asbes Gel. Kecil Tbl 5 mm ; 2.25 x 0.92
81 Asbes Plat 90x 180x 0.03 cm
82 Asbes Sirap Uk. 20x3x400 cm
83 Asbes Nok Nok Asbes Gel. Besar
84 Asbes Nok Nok Asbes Gel. Kecil
85 Closet Jongkok
86 Closet Duduk ex. Toto Lengkap
87 Wastafel Ex. Toto
88 Urinoir Ex. Toto
89 Hand Shower
NO URAIAN KETERANGAN
90 Bak Cuci Piring
91 Tempat Sabun Duty
92 Granit 30 x 60
93 Granit 40 x 60
94 Granit 60 x 60
95 Keramik Motif 20 x 20 ( asia )
96 Keramik Motif 20 x 25 ( asia )
97 Keramik Motif 30 x 30 ( asia )
98 Keramik Motif 40 x 40 ( asia )
99 Keramik Polos 20 x 25 (mulia)
100 Keramik Polos 30 x 30 (asia)
101 Keramik Polos 40 x 40 (asia)
102 Keramik List motif / variasi
103 Keramik Kasar 40 x 40
104 Keramik Kasar 60 x 60
105 Lem Kayu, Rajawali
106 Lem PVC
107 sealent
108 Marmer Ex. Lampung 30 x 60 cm (A)
109 Marmer Ex. Lampung 30 x 60 cm (B)
110 Marmer Ex. Lampung 40 x 60 cm (A)
111 Marmer Ex. Tulungagung 30 x 60 cm
112 Marmer Ex. Tulungagung 40 x 60 cm
113 Marmer Plint
114 Kaca Polos Bening 8 mm
115 Kaca Polos Bening 10 mm
116 Kaca Polos Bening 12 mm
117 Kaca Polos Bening 20 mm
118 Kaca Polos Bening tebal 3mm
119 Kaca Polos Bening tebal 5mm
120 Kaca Rayben 12 mm
121 Kaca Rayben tebal 3mm
122 Kaca Rayben tebal 5mm
123 Kaca Kaca Es Tebal 5mm
124 Kaca Vertical Blind
125 Kaca Acrylic, bening uk. 5mm ( 122 x 244 cm )
126 Kaca Acrylic, bening uk. 10mm ( 122 x 244 cm )
127 Kaca Kaca Tempered Warna Tebal 8 mm
128 Kaca Kaca Tempered Warna Tebal 12 mm
129 Batu Batako Semen (40x 20x 10 cm)
130 Batu Candi Alur
131 Batu Gilang Ex Cirebon Acak
132 Batu Gilang Ex Cirebon Uk. 10 x 20
133 Batu Gilang Ex Jember Acak
134 Batu Gilang Ex Jember 20x40
NO URAIAN KETERANGAN
135 Batu Grass Block
136 Batu Looster, abu-abu (55x25) cm
137 Batu Looster, Merah (10x25) cm
138 Batu Palimanan Hijau
139 Batu Palimanan Kuning
140 Seng Gelombang BJLS 20 uk. (80 x 300 cm)
141 Seng Gelombang BJLS 28 uk. (80 x 180 cm)
142 Seng Gelombang BJLS 30 uk. (80 x 210 cm)
143 Seng Gelombang BJLS 30 uk. (80x 300cm)
144 Seng Gelombang BJLS 30 uk. (80x 180cm)
145 Seng Gelombang BJLS 40 uk. (80 cm x300 cm)
146 Seng Gelombang BJLS 40 uk. (80 cm x210 cm)
147 Seng Gelombang BJLS 40 uk (80 x 240 cm)
148 Seng Gelombang Nok Stel Gelombang Seng
149 Seng Gelombang Plat BJLS 30/30 cm
150 Seng Gelombang Plat BJLS 30/40 cm
151 Seng Gelombang Plat BJLS 30/80 cm
152 Seng Gelombang Plat uk (0,03x90x180)cm
153 Seng Gelombang Sambungan talang
154 Seng Gelombang Talang 60cm x 30 BJLS
155 Seng Gelombang Talang 60cm x 40 BJLS
156 Seng Gelombang Talang 90cm x 30 BJLS
157 Seng Gelombang Talang 90cm x 40 BJLS
158 Atap Spandek tebal 0,3
159 Atap Spandek tebal 0,35
160 Atap Spandek tebal 0,4
161 Atap Spandek tebal 0,45
162 Atap Spandek tebal 0,5
163 Buis Beton Bulat 100/100 cm
164 Buis Beton Bulat 15/100 cm
165 Buis Beton Bulat 20/100 cm
166 Buis Beton Bulat 30/100 cm
167 Buis Beton Bulat 40/100 cm
168 Buis Beton Bulat 50/100 cm
169 Buis Beton Bulat 50/50 cm
170 Buis Beton Bulat 60/100 cm
171 Buis Beton Bulat 60/50 cm
172 Buis Beton Bulat 80/100 cm
173 Buis Beton Bulat 80/50 cm
174 Buis Beton Bulat 100/50 cm
175 Buis Beton U 15 cm
176 Buis Beton U 20 cm
177 Buis Beton U 30 cm
178 Buis Beton U 40 cm
179 Buis Beton U 50 cm
NO URAIAN KETERANGAN
180 Paku Paku Asbes
181 Paku Paku Biasa/ keling/ Usuk/ Triplek/ Eternit/ Reng
182 Paku Paku Sekrup Besar
183 Paku Sekrup 1"
184 Pintu Kamar Mandi galvalum wto
185 Pintu Kamar Mandi Aluminium Uk.70 x 200cm
186 Pintu Kamar Mandi PVC polos uk. 197 x 70 cm
187 Sekrup 2"
188 Gypsum board Tebal 12 mm
189 Gypsum board Tebal 9 mm
190 Kalsiboard Uk. 244 x 122 x 3,5 mm
191 Kalsiboard Uk. 244 x 122 x 4,5 mm
192 Kalsiboard Uk. 244 x 122 x 6 mm
193 Kalsiboard Uk. 244 x 122 x 9 mm
194 Kalsiplank lbr = 20 cm
195 Kalsiplank lbr = 30 cm
196 Got Talang R.10 (1/2 lingkaran)
197 Got Talang R.10 (segmen)
198 Got Talang R.15 (1/2 lingkaran)
199 Got Talang R.15 (segmen)
200 Got Talang R.25 (1/2 lingkaran)
201 Got Talang R.25 (segmen)
202 Glass Bit
203 Tiang Pancang Persegi Uk. 30 cm x 30 cm x 6 m Beton K 500
204 HPL Type Metalic, Hairline, Uk. 1242mm x 2484 mm x 0,8 mm
205 HPL Type Metalic, Alumunium, Uk. 1242mm x 2484 mm x 0,8 mm
206 HPL Type Metalic, Bronze, Uk. 1242mm x 2484 mm x 0,8 mm
207 HPL Type Monochromatic, Light Grey,Uk. 1242mm x 2484 mm x 0,8 mm
208 Lem HPL 9,5 Kg
209 Alucopan Goldstar
210 Alucopan Alustar
211 Alucopan New Alucopan
212 Alucopan Luminate
213 Alucopan Alucobond
214 Roof Tank Kap. 2m3
215 Tandon Air Stainless + Fiber
216 Engsel Akses
217 Engsel Dior 3 kuning
218 Engsel Dior 4 kuning
219 Engsel Dior 5 kuning
220 Engsel Engsel Dorong / Railing Pintu Merk Handerson
221 Engsel Gomeo 4 dim Kuningan
222 Engsel Hidrolis Pintu aluminium
223 Engsel Hings, 5 dim Kuningan Jendela
224 Engsel Jendela Kuningan
NO URAIAN KETERANGAN
225 Engsel kuningan 3" (Pintu Kayu)
226 Engsel muller kuning 5" (Pintu Alm.)
227 Engsel salon HK 20
228 Engsel salon HK 25
229 Engsel Salon HK 30
230 Engsel Solid EK 17
231 Gembok Hitam Cooper 75 mm
232 Grendel Engsel Kuningan
233 Grendel Grendel Biasa (Besar)
234 Grendel Grendel Biasa (Kecil)
235 Grendel Grendel Panjang
236 Grendel Grendel Tanam
237 Grendel Kuningan / crom (kuning)
238 Kran air goldeno /yuri 1/2"
239 Kran Plastik 1/2"
240 Kran Putar Untuk Tanaman 3/4"
241 Kran Bebek, SKM 10 JC
242 Kran Bebek, Sobar 10 JC
243 Kran Bebek, Fio 10 JC
244 Kunci Kuda Terbang 2x Putar
245 Kunci Kunci Tanam Aluminium
246 Kunci Kunci Tanam Biasa
247 Kunci Kunci Tanam Kamar Mandi
248 Handle Solid HRE 6141
249 Hak Angin Biasa
250 Hak Angin Kuningan
251 Kait Angin
252 Hak Angin Lurus Kuningan
253 Door Holder
254 Door Kloser
255 Door Stop
256 Rel Pintu Dorong
257 Penyangga Jendela Biasa
258 Rel Pintu Dorong Uk. 90
259 Kabel NYA Supreme, 2 x 2,5 mm
260 Kabel NYA Supreme, 1 x 2.5 mm
261 Kabel NYM Supreme 2 x 1.5 mm
262 Kabel NYM Supreme, 2 x 2.5 mm
263 Kabel NYY Supreme, 2 X 4 mm
264 Kabel NYY Supreme, 4 X 2,5 mm
265 Kabel NYY Supreme, 4 X 10 mm
266 Kabel Tray Lebar 100 x Tinggi 50 x Panjang 2400 x Ketebalan Plat 1,2 mm
267 Kabel Tray 150 x 50 x 2400 x 1,2 mm
268 Kabel Tray 200 x 50 x 2400 x 1,2 mm
269 Kabel Tray 300 x 50 x 2400 x 1,2 mm
NO URAIAN KETERANGAN
270 Kabel Tray 400 x 50 x 2400 x 1,2 mm
271 Kabel Tray 500 x 50 x 2400 x 1,2 mm
272 Kabel Tray 150 x 100 x 2400 x 1,2 mm
273 Kabel Tray 200 x 100 x 2400 x 1,2 mm
274 Kabel Tray 300 x 100 x 2400 x 1,2 mm
275 Kabel Tray 400 x 100 x 2400 x 1,2 mm
276 Kabel Tray 500 x 100 x 2400 x 1,2 mm
277 Lampu TL Philips, 18 watt
278 Lampu TL Philips, 20 Watt + Kap
279 Lampu TL Philips, 40 Watt + Kap
280 Lampu Essential Philips, 18 watt
281 Lampu Essential Philips, 23 watt
282 Lampu RM 2 x 36 Watt, Fatro
283 Lampu RM 2 x 18 Watt, Fatro
284 Lampu Baret 32 Watt
285 Lampu RM 2 x 36 Watt, Artolite
286 Lampu RM 2 x 18 Watt, Artolite
287 Lampu Downlight SM D 150 E27 PL ESS 18W, Artolite
288 Lampu Downlight RD 150 E27 SAVY PL ESS 18W, Artolite
289 Stop Kontak Broco, 2 Port
290 Saklar Broco, Ganda
291 Saklar Broco, Engkel IB
292 Fitting Plafon
293 MCB 10A, 3 Phase Schneider
294 Pipa PVC buta dia = 12" klas VP AWS 10
295 Pipa PVC buta dia = 6" klas VP AWS 10
296 Pipa PVC Maspion AW 1 1/2" X 6 m
297 Pipa PVC Maspion AW 1 1/4" X 6 m
298 Pipa PVC Maspion AW 1" X 4 m
299 Pipa PVC Maspion AW 1" X 6 m
300 Pipa PVC Maspion AW 1 1/4" X 4 m
301 Pipa PVC Maspion AW 1 1/2" X 4 m
302 Pipa PVC Maspion AW 1/2" X 4 m
303 Pipa PVC Maspion AW 1/2" X 6 m
304 Pipa PVC Maspion AW 10" X 4 m
305 Pipa PVC Maspion AW 10" X 6 m
306 Pipa PVC Maspion AW 12" X 4 m
307 Pipa PVC Maspion AW 12" X 6 m
308 Pipa PVC Maspion AW 14" X 4 m
309 Pipa PVC Maspion AW 14" X 6 m
310 Pipa PVC Maspion AW 16" X 4 m
311 Pipa PVC Maspion AW 16" X 6 m
312 Pipa PVC Maspion AW 2 1/2" X 6 m
313 Pipa PVC Maspion AW 2" X 4 m
314 Pipa PVC Maspion AW 2" X 6 m
NO URAIAN KETERANGAN
315 Pipa PVC Maspion AW 2 1/2" X 4 m
316 Pipa PVC Maspion AW 3" X 4 m
317 Pipa PVC Maspion AW 3" X 6 m
318 Pipa PVC Maspion AW 3/4" X 4 m
319 Pipa PVC Maspion AW 3/4" X 6 m
320 Pipa PVC Maspion AW 4" X 4 m
321 Pipa PVC Maspion AW 4" X 6 m
322 Pipa PVC Maspion AW 5" X 4 m
323 Pipa PVC Maspion AW 5" X 6 m
324 Pipa PVC Maspion AW 6" X 4 m
325 Pipa PVC Maspion AW 6" X 6 m
326 Pipa PVC Maspion AW 8" x 4 m
327 Pipa PVC Maspion AW 8" X 6 m
328 Pipa PVC Maspion C 1 1/2" X 4 m
329 Pipa PVC Maspion C 1 1/2" X 6 m
330 Pipa PVC Maspion C 1 1/4" X 4 m
331 Pipa PVC Maspion C 1 1/4" X 6 m
332 Pipa PVC Maspion C 1" X 4 m
333 Pipa PVC Maspion C 1" X 6 m
334 Pipa PVC Maspion C 2 1/2" X 4 m
335 Pipa PVC Maspion C 2 1/2" X 6 m
336 Pipa PVC Maspion C 2" X 4 m
337 Pipa PVC Maspion C 2" X 6 m
338 Pipa PVC Maspion C 3" X 4 m
339 Pipa PVC Maspion C 3" X 6 m
340 Pipa PVC Maspion C 3/4" X 4 m
341 Pipa PVC Maspion C 3/4" X 6 m
342 Pipa PVC Maspion C 4" X 4 m
343 Pipa PVC Maspion C 4" X 6 m
344 Pipa PVC Maspion C 5/8" X 4 m
345 Pipa PVC Maspion C 5/8" X 6 m
346 Pipa PVC Maspion D 2 1/2" X 6 m
347 Pipa PVC Maspion D 1 1/2" X 6 m
348 Pipa PVC Maspion D 1 1/4" X 6 m
349 Pipa PVC Maspion D 1 1/4" X 4 m
350 Pipa PVC Maspion D 1 1/2" X 4 m
351 Pipa PVC Maspion D 10" X 4 m
352 Pipa PVC Maspion D 10" X 6 m
353 Pipa PVC Maspion D 12" X 4 m
354 Pipa PVC Maspion D 12" X 6 m
355 Pipa PVC Maspion D 14" x 4 m
356 Pipa PVC Maspion D 14" X 6 m
357 Pipa PVC Maspion D 16" x 4 m
358 Pipa PVC Maspion D 16" X 6 m
359 Pipa PVC Maspion D 2" X 4 m
NO URAIAN KETERANGAN
360 Pipa PVC Maspion D 2" X 6 m
361 Pipa PVC Maspion D 2 1/2" X 4 m
362 Pipa PVC Maspion D 20" x 4 m
363 Pipa PVC Maspion D 20" X 6 m
364 Pipa PVC Maspion D 3" X 4 m
365 Pipa PVC Maspion D 3" X 6 m
366 Pipa PVC Maspion D 4" X 4 m
367 Pipa PVC Maspion D 4" X 6 m
368 Pipa PVC Maspion D 5" X 4 m
369 Pipa PVC Maspion D 5" X 6 m
370 Pipa PVC Maspion D 6" X 4 m
371 Pipa PVC Maspion D 6" X 6 m
372 Pipa PVC Maspion D 8" X 4 m
373 Pipa PVC Maspion D 8" X 6 m
374 Pipa PVC Dia 1" S-12,5 @ 6m
375 Pipa PVC Dia 1 1/2" S-12,5 @ 6m
376 Pipa PVC Dia 10" S-12,5 @ 6m AW
377 Pipa PVC Dia 2" S-12,5 @ 6m
378 Pipa PVC Dia 2 1/2" S-12,5 @ 6m
379 Pipa PVC Dia 3" S-12,5 @ 6m
380 Pipa PVC Dia 3/4" S-12,5 @ 6m
381 Pipa PVC Dia 4" S-12,5 @ 6m
382 Pipa PVC Dia 6" S-12,5 @ 6m
383 Pipa PVC Dia 8" S-12,5 @ 6m AW
384 Pipa PVC screen dia = 6" klas VP AWS 10
385 Pipa Galvanis Dia 2 - 1/2" @ 6m Kelas B
386 Pipa Galvanis Dia 3" @ 6m Kelas B
387 Pipa Galvanis Dia 4" @ 6m Kelas B
388 Pipa Galvanis Dia 5" @ 6m Kelas B
389 Pipa Galvanis Dia 6" @ 6m Kelas B
390 Pipa Galvanis Dia 1/2" @ 6m Kelas A
391 Pipa Galvanis Dia 3/4" @ 6m Kelas A
392 Pipa Galvanis Dia 1" @ 6m Kelas A
393 Pipa Galvanis Dia 1 - 1/4" @ 6m Kelas A
394 Pipa Galvanis Dia 1 - 1/2" @ 6m Kelas A
395 Pipa Galvanis Dia 2" @ 6m Kelas A
396 Pipa Galvanis Dia 2 - 1/2" @ 6m Kelas A
397 Pipa Galvanis Dia 3" @ 6m Kelas A
398 Pipa Galvanis Dia 4" @ 6m Kelas A
399 Pipa Galvanis Dia 5" @ 6m Kelas A
400 Pipa Galvanis Dia 6" @ 6m Kelas A
401 Pipa Galvanis Dia 8" @ 6m Kelas A
402 Pipa Galvanis Dia 1/2" @ 6m Medium B
403 Pipa Galvanis Dia 3/4" @ 6m Medium B
404 Pipa Galvanis Dia 1" @ 6m Medium B
NO URAIAN KETERANGAN
405 Pipa Galvanis Dia 1 - 1/4" @ 6m Medium B
406 Pipa Galvanis Dia 1 - 1/2" @ 6m Medium B
407 Pipa Galvanis Dia 2" @ 6m Medium B
408 Pipa Galvanis Dia 2 - 1/2" @ 6m Medium B
409 Pipa Galvanis Dia 3" @ 6m Medium B
410 Pipa Galvanis Dia 4" @ 6m Medium B
411 Pipa Galvanis Dia 5" @ 6m Medium B
412 Pipa Galvanis Dia 6" @ 6m Medium B
413 Pipa Galvanis Dia 1/2" @ 6m Medium A
414 Pipa Galvanis Dia 3/4" @ 6m Medium A
415 Pipa Galvanis Dia 1" @ 6m Medium A
416 Pipa Galvanis Dia 1 - 1/4" @ 6m Medium A
417 Pipa Galvanis Dia 1 - 1/2" @ 6m Medium A
418 Pipa Galvanis Dia 2" @ 6m Medium A
419 Pipa Galvanis Dia 2 - 1/2" @ 6m Medium A
420 Pipa Galvanis Dia 3" @ 6m Medium A
421 Pipa Galvanis Dia 4" @ 6m Medium A
422 Pipa Galvanis Dia 5" @ 6m Medium A
423 Pipa Galvanis Dia 6" @ 6m Medium A
424 Pipa Galvanis Dia 8" @ 6m Medium A
425 Pipa Stainless Dia 5/8" @ 6m (heinse Merah)
426 Pipa Stainless Dia 1 1/4" @ 6m (heinse Merah)
427 Pipa Stainless Dia 1 1/2" @ 6m (heinse Merah)
428 Pipa Stainless Dia 2" @ 6m (heinse Merah)
429 Reducer PVC All Flange Dia 12" x 6"
430 Tee Maspion, TS 1"
431 L. Joint PVC dia. 6"
432 L. Joint PVC dia. 4"
433 Las Boch GIP dia. 3"
434 T Joint PVC dia. 6"
435 T Joint PVC dia. 4"
436 T Joint GIP dia. 3"
437 Flens Adaptor PVC dia. 6"
438 Flens Adaptor PVC dia. 4"
439 Flens Adaptor GIP dia. 3"
440 Flens Adaptor GIP dia. 4"
441 Reducer PVC 4" - 6"
442 Reducer GIP 3" - 4"
443 Alva Valve dia. 6"
444 Gate Valve 3"
445 Buis Beton 100/50 cm
446 Air Valve Single dia. 2"
447 Clamp Sadle dia 4"
448 Bambu Bongkotan Dia 12 cm x 6 m
449 Kayu Bekesting (meranti)
NO URAIAN KETERANGAN
450 Kayu Glugu / pohon kelapa
451 Kayu Jati Balok 6 x 12 x 400cm
452 Kayu Jati Balok 8 x 12 x 400cm
453 Kayu Jati Kaso 3 x 5 x 400cm
454 Kayu Jati Kaso 4 x 6 x 400cm
455 Kayu Jati Kaso 5 x 7 x 400cm
456 Kayu Jati Papan 2 x 20 x 400cm
457 Kayu Jati Reng 2 x 3 x 400cm
458 Kayu Jati Reng 3 x 5 x 400cm
459 Kayu Kamper Balok 6 x 12 x 400cm
460 Kayu Kamper Kaso 5 x 7 x 400cm
461 Kayu Kamper Papan 2 x 20 x 400cm
462 Kayu Kamper Reng 2 x 3 x 400cm
463 Kayu Kotak adukan
464 Kayu Kruing Balok 6 x 12 x 400cm
465 Kayu Kruing Kaso 5 x 7 x 400cm
466 Kayu Kruing Papan 2 x 20 x 400cm
467 Kayu Kruing Reng 2 x 3 x 400cm
468 Kayu Meranti Balok 6 x 12 x 400Cm
469 Kayu Meranti Kaso 5 x 7 x 400Cm
470 Kayu Meranti Papan 2 x 20 x 400Cm
471 Kayu Meranti Reng 2 x 3 x 400Cm
472 Kayu Multipleks (0,9 x 122 x 244)cm
473 Kayu Multipleks (1,2 x 122 x 244) cm
474 Kayu Perancah
475 Kayu Plywood 122x244x4 mm
476 Kayu Plywood 122x244x6 mm
477 Kayu Plywood 122x244x8 mm
478 Kayu Teakwood 90.210.4 mm
479 Kayu Teakwood (0,4 x 110 x 210) cm
480 Kayu Teakwood (0,4 x 122 x 244) cm
481 Kayu Tripleks (0,3 x 122 x 244)cm
482 Kayu Tripleks (0,4 x 122 x 244)cm
483 Kayu Tripleks (0,6 x 122 x 244)cm
484 Kayu Tripleks (0,3 x 90 x 210) cm + Aluminium
485 Waterproofing No Drop, 1 Kg
486 Waterproofing No Drop, 4 Kg
487 Waterproofing No Drop, 20 Kg
488 Waterproofing Multiguard, 1 Kg
489 Cat Genteng, Sanlek
490 Cat Kayu / Emco
491 Cat Besi/emco
492 Cat Meni Besi, Pedang
493 Cat Minyak Cat, Avian
494 Cat Minyak Cat, Biasa
NO URAIAN KETERANGAN
495 Cat Plamur Kayu, Cap Pedang
496 Cat Politur jadi
497 Cat Shanding
498 Cat Teer
499 Cat Catylac
500 Cat Tembok Decholite (5 Kg)
501 Cat Tembok Interior Dulux Khusus
502 Cat Tembok Interior Dulux standar
503 Cat Tembok, Paragon
504 Cat Tembok, Paragon (5 Kg)
505 Cat Thinner A Special
506 Cat Thinner B
507 Cat Wood Filler
508 Cat Tembok Eksterior Dulux ( Standar )
509 Cat Tembok Eksterior Dulux ( Khusus )
510 Cat Tembok Dasar Alkali, Interior Dulux
511 Cat Jotun Eksterior Jotashield
NO URAIAN KETERANGAN
NO URAIAN KETERANGAN
1 Paving conblock ( Bata ) Abu. Uk. 21 x 10.5 x 6 cm ex. Focon
2 Paving conblock ( Bata ) Abu. Uk. 21 x 10.5 x 8 cm ex. Focon
3 Paving conblock ( Bata ) Warna. Uk. 21 x 10.5 x 6 cm ex. Focon ( Merah, Hijau, Hitam, Kuning )
4 Paving conblock ( Bata ) Warna. Uk. 21 x 10.5 x 8 cm ex. Focon ( Merah, Hijau, Hitam, Kuning )
5 Paving conblock ( Corso ) Abu. Uk. 21 x 21 x 6 cm ex. Focon
6 Paving conblock ( Corso ) Abu. Uk. 21 x 21 x 8 cm ex. Focon
7 Paving conblock ( Corso ) Warna. Uk. 21 x 21 x 6 cm ex. Focon ( Merah, Hijau, Hitam, Kuning )
8 Paving conblock ( Corso ) Warna. Uk. 21 x 21 x 8 cm ex. Focon ( Merah, Hijau, Hitam, Kuning )
9 Paving conblock ( Corso 31 ) Abu. Uk. 31.5 x 31.5 x 6 cm ex. Focon
10 Paving Conblock ( Hexagonal ) Abu. Uk. 12 x 12 x 6 cm ex. Focon
11 Kansetin 10.20.40 uk. 10 x 40 x 20 cm ex. Focon
12 Kantein 15.30.50 uk. 15 x 50 x 30 cm ex. Focon
13 Grass Block uk. 21.5 x 42 cm, Tebal 10 ex. Focon
14 Panel Beton Fence 180.55.5 ex. Focon
15 Panel Beton Fence 240.40.5 ex. Focon
16 Panel Beton Fence 240.50.5 ex. Focon
17 Kolom 300 Precast 300 x 16 x 15 cm ex. Focon
18 Kolom 325 Precast 325 x 16 x 15 cm ex. Focon
19 Kolom 350 Precast 350 x 16 x 15 cm ex. Focon
20 Kolom 375 Precast 375 x 16 x 15 cm ex. Focon
21 Kolom 420 Precast 420 x 16 x 20 cm ex. Focon
22 Kolom 420 Precast 420 x 20 x 20 cm ex. Focon
23 Kolom 500 Precast 500 x 16 x 20 cm ex. Focon
24 Topi Uskup Besar 20.35 x 29.7 cm Tebal 6 cm ex. Focon
25 Topi Uskup Besar 20.35 x 29.7 cm Tebal 8 cm ex. Focon
26 Topi Uskup Kecil 10.4 x 14.7 cm Tebal 6 cm ex. Focon
27 Topi Uskup Kecil 10.4 x 14.7 cm Tebal 8 cm ex. Focon
28 Paving conblock ( Bata ) Abu. Uk. 21 x 10.5 x 6 cm ex. Calvary
29 Paving conblock ( Bata ) Abu. Uk. 21 x 10.5 x 8 cm ex. Calvary
30 Paving conblock ( Bata ) Warna. Uk. 21 x 10.5 x 6 cm ex. Calvary ( Merah, Hijau, Hitam, Kuning )
31 Paving conblock ( Bata ) Warna. Uk. 21 x 10.5 x 8 cm ex. Calvary ( Merah, Hijau, Hitam, Kuning )
32 Paving conblock ( Corso ) Abu. Uk. 21 x 21 x 6 cm ex. Calvary
33 Paving conblock ( Corso ) Abu. Uk. 21 x 21 x 8 cm ex. Calvary
34 Paving conblock ( Corso ) Warna. Uk. 21 x 21 x 6 cm ex. Calvary ( Merah, Hijau, Hitam, Kuning )
35 Paving conblock ( Corso ) Warna. Uk. 21 x 21 x 8 cm ex. Calvary ( Merah, Hijau, Hitam, Kuning )
36 Paving conblock ( Corso 31 ) Abu. Uk. 31.5 x 31.5 x 6 cm ex. Calvary
37 Paving Conblock ( Hexagonal ) Abu. Uk. 12 x 12 x 6 cm ex. Calvary
38 Kansetin 10.20.40 uk. 10 x 40 x 20 cm ex. Calvary
39 Kantein 15.30.50 uk. 15 x 50 x 30 cm ex. Calvary
40 Grass Block uk. 21.5 x 42 cm, Tebal 10 ex. Calvary
41 Panel Beton Fence 180.55.5 ex. Calvary
42 Panel Beton Fence 240.40.5 ex. Calvary
43 Panel Beton Fence 240.50.5 ex. Calvary
44 Kolom 300 Precast 300 x 16 x 15 cm ex. Calvary
NO URAIAN KETERANGAN
45 Kolom 325 Precast 325 x 16 x 15 cm ex. Calvary
46 Kolom 350 Precast 350 x 16 x 15 cm ex. Calvary
47 Kolom 375 Precast 375 x 16 x 15 cm ex. Calvary
48 Kolom 420 Precast 420 x 16 x 20 cm ex. Calvary
49 Kolom 420 Precast 420 x 20 x 20 cm ex. Calvary
50 Kolom 500 Precast 500 x 16 x 20 cm ex. Calvary
51 Topi Uskup Besar 20.35 x 29.7 cm Tebal 6 cm ex. Calvary
52 Topi Uskup Besar 20.35 x 29.7 cm Tebal 8 cm ex. Calvary
53 Topi Uskup Kecil 10.4 x 14.7 cm Tebal 6 cm ex. Calvary
54 Topi Uskup Kecil 10.4 x 14.7 cm Tebal 8 cm ex. Calvary
55 Paving conblock ( Bata ) Abu. Uk. 21 x 10.5 x 6 cm ex. Conblock
56 Paving conblock ( Bata ) Abu. Uk. 21 x 10.5 x 8 cm ex. Conblock
57 Paving conblock ( Bata ) Warna. Uk. 21 x 10.5 x 6 cm ex. Conblock ( Merah, Hijau, Hitam, Kuning )
58 Paving conblock ( Bata ) Warna. Uk. 21 x 10.5 x 8 cm ex. Conblock ( Merah, Hijau, Hitam, Kuning )
59 Paving conblock ( Corso ) Abu. Uk. 21 x 21 x 6 cm ex. Conblock
60 Paving conblock ( Corso ) Abu. Uk. 21 x 21 x 8 cm ex. Conblock
61 Paving conblock ( Corso ) Warna. Uk. 21 x 21 x 6 cm ex. Conblock ( Merah, Hijau, Hitam, Kuning )
62 Paving conblock ( Corso ) Warna. Uk. 21 x 21 x 8 cm ex. Conblock ( Merah, Hijau, Hitam, Kuning )
63 Paving conblock ( Corso 31 ) Abu. Uk. 31.5 x 31.5 x 6 cm ex. Conblock
64 Paving Conblock ( Hexagonal ) Abu. Uk. 12 x 12 x 6 cm ex. Conblock
65 Kansetin 10.20.40 uk. 10 x 40 x 20 cm ex. Conblock
66 Kantein 15.30.50 uk. 15 x 50 x 30 cm ex. Conblock
67 Grass Block uk. 21.5 x 42 cm, Tebal 10 ex. Conblock
68 Panel Beton Fence 180.55.5 ex. Conblock
69 Panel Beton Fence 240.40.5 ex. Conblock
70 Panel Beton Fence 240.50.5 ex. Conblock
71 Kolom 300 Precast 300 x 16 x 15 cm ex. Conblock
72 Kolom 325 Precast 325 x 16 x 15 cm ex. Conblock
73 Kolom 350 Precast 350 x 16 x 15 cm ex. Conblock
74 Kolom 375 Precast 375 x 16 x 15 cm ex. Conblock
75 Kolom 420 Precast 420 x 16 x 20 cm ex. Conblock
76 Kolom 420 Precast 420 x 20 x 20 cm ex. Conblock
77 Kolom 500 Precast 500 x 16 x 20 cm ex. Conblock
78 Topi Uskup Besar 20.35 x 29.7 cm Tebal 6 cm ex. Conblock
79 Topi Uskup Besar 20.35 x 29.7 cm Tebal 8 cm ex. Conblock
80 Topi Uskup Kecil 10.4 x 14.7 cm Tebal 6 cm ex. Conblock
81 Topi Uskup Kecil 10.4 x 14.7 cm Tebal 8 cm ex. Conblock
82 Paving Stone ( Lokal ) Tebal 6cm Kw 1,abu-abu
83 Paving Stone ( Lokal ) Tebal 8cm Kw 1, abu-abu
84 Grass Block ( Lokal ) Tebal 6
85 Kanstin ( Lokal ) Uk. 40 x18 x 10 cm
86 Kanstin ( Lokal ) Uk. 50 x 35 x 15 cm
NO URAIAN KETERANGAN
NO URAIAN KETERANGAN
NO URAIAN KETERANGAN
Set
Set
Set
Set
Pasang
Set
Pasang
Set
Pasang
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Kotak
Kotak
Kotak
Kotak
Pasang
Pasang
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Pasang
set
set
set
Set
Set
Set
Set
Set
Buah
Buah
m
m
m
m
m
m
m
Roll
Roll
Roll
Roll
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Buah
Unit
Unit
Buah
Buah
Unit
Unit
Unti
Unit
Unit
Unit
Unit
Unit
Buah
Buah
Buah
Buah
m'
m'
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
m'
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Batang
m3
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Batang
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Buah
m3
m3
m3
m3
m3
m3
m3
m3
Lembar
Lembar
m3
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Kaleng
Kaleng
Kaleng
Kaleng
Galon
Kg
Kg
Kg
Liter
Liter
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Kg
Liter
Kg
Kg
5Kg
Galon
Liter
Liter
Kg
Galon
Liter
Liter
Kg
Liter
Liter
Liter
Kg
………………………….., 2018
Toko/UD
…………………………………….
…………………………………….
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m2
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m2
m1
m1
m1
m1
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
m1
m1
m1
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m2
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m2
m2
m2
m2
m2
m2
Buah
bh
bh
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
Buah
bh
bh
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Provinsi Jawa Timur
Kota/Kabupaten Kabupaten Madiun
Tahun 2015
Nomor SK. Simb/12/12/2013
Ditetapkan oleh Walikota Bandung
Nama Ridwan Kamil
Ditetapkan di Bandung
Tanggal 29 April 2013
II BAHAN PEREKAT
1 Semen (50 Kg) Semen Indonesia zak
2 Semen Warna Semen Indonesia kg
IV BAHAN KAYU
1 Kayu Klas I Jat m3
2 Kayu Klas II Kamper m3
3 Kayu Klas III Merant m3
4 Kayu Klas IV Terentang m3
5 Dolken dia 8 s/d 10 cm p. 4 m btg
V BAHAN ALMUNIUM
1 Kusen Almunium 3", Alexindo m'
2 Rangka Jendela Almunium Alexindo m'
3 Rangka Pintu Almunium Alexindo m'
4 Kusen & Pintu PVC toilet Maspion unt
5 Engsel 3", ex Bos bh
7 Handle pintu type HRE 75.01 ex. Cisa bh
VI BAHAN PELAPIS :
1 Triplek t. 3 mm Uk 120x240 cm lbr
2 Triplex t. 4 mm Uk 120x240 cm lbr
3 Triplex t. 9 mm Uk 120x240 cm lbr
IX BAHAN KACA :
1 Kaca Polos 3 mm m2
2 Kaca Polos 5 mm m2
3 Kaca Polos 8 mm m2
XI BAHAN FINISHING :
1 Cat kayu/Besi ex. SEIV Kg
2 Plamir Kayu Kg
3 Meni kayu ex. Nippon kg
4 Wood Filler Impra Kg
5 Thinner ND IMPALA Ltr
6 Amplas Kayu Lbr
7 Kwas cat bh
8 Cat Tembok kw1 ex. Dulux ; Warna standard Kg
9 Cat Tembok kw2 ex. Vinilex ; Warna standard Kg
10 Plamir Tembok Kg
XV PERALATAN ELEKTRIKAL
1 Box panel PVC isi 4 MCB Legran bh
2 MCB 6 A Legran bh
3 MCB 4 A Legran bh
4 Kabel NYM 2 x 2,5 mm2 m'
5 Kabel NYM 3 x 2,5 mm2 m'
6 Kabel telephone 4 x 0.5 mm m'
7 Isolasi bh
800
5,000
105,700
207,800
234,650
112,250
168,050
144,050
107,200
96,300
73,900
2,200
14,200
14,500
18,050
124,800
212,950
18,050
18,009,150
9,500,000
5,400,300
3,484,050
8,400
62,450
62,450
62,450
750,000
18,250
199,500
52,250
66,100
120,050
45,650
394,150
15,217
98,538
2,000
10,250
6,050
10,500
48,250
80,000
95,000
190,000
14,500
14,500
14,500
3,700
50,650
24,050
24,050
36,050
24,050
4,900
7,300
21,010
15,000
35,500
372,050
2,400,150
141,050
658,240
275,000
181,000
598,000
51,900
44,000
299,000
700,900
115,000
71,850
18,050
50,000
7,008
12,763
10,617
29,008
53,017
76,017
45,000
35,000
1,864,000
1,116,500
25,000
35,000
950,000
550,000
150,000
50,000
50,000
14,025
18,900
15,000
5,000
42,000
42,000
52,500
52,500
52,500
52,500
42,000
42,000
52,500
47,250
52,500
50,000
52,500
35,000
63,000
15,000
Koef. SATUAN
NOMOR URAIAN KEGIATAN
I PENGAIRAN
24.09.01 Pekerjaan Bangunan Air
24.09.01.01 Pengukuran Bangunan MC untuk JIAT Buah
Tenaga:
22.01.01.03.02 Juru Ukur 0.250 O.H
22.01.01.03.08 Pekerja/Buruh Tak Terampil 0.750 O.H
Bahan:
20.01.01.62.40 Patok Kayu Meranti 0.002 m3
20.01.01.09.01.05 Cat Meni/dasar 0.020 kg
20.01.01.40.09 Paku Payung 0.010 kg
Peralatan:
21.02.01.01.21 Sewa Pesawat Ukur (Poligone) 0.250 Jam
20.02.06.02.32 Meteran 0.020 Buah
21.02.01.02.21 Palu / Bodem 0.030 unit/Hari
Nilai HSPK :
24.09.01.02 Pengukuran Bangunan MC untuk Bendung Buah
Tenaga:
22.01.01.03.02 Juru Ukur 1.500 O.H
22.01.01.03.08 Pekerja/Buruh Tak Terampil 4.500 kg
Bahan:
20.01.01.62.40 Patok Kayu Meranti 0.012 m3
20.01.01.09.01.05 Cat Meni/dasar 0.120 kg
20.01.01.40.09 Paku Payung 0.050 kg
Peralatan:
21.02.01.01.21 Sewa Pesawat Ukur (Poligone) 1.000 Jam
20.02.06.02.32 Meteran 0.030 Buah
21.02.01.02.21 Palu / Bodem 0.060 unit/Hari
Nilai HSPK :
24.09.01.03 Pengukuran Saluran MC untuk JIAT km
Tenaga:
22.01.01.03.02 Juru Ukur 2.000 O.H
22.01.01.03.08 Pekerja/Buruh Tak Terampil 6.000 O.H
Bahan:
20.01.01.62.40 Patok Kayu Meranti 0.012 m3
20.01.01.09.01.05 Cat Meni/dasar 0.120 kg
20.01.01.40.09 Paku Payung 0.050 kg
Peralatan:
21.02.01.01.21 Sewa Pesawat Ukur (Poligone) 2.000 Jam
20.02.06.02.32 Meteran 0.045 Buah
21.02.01.02.21 Palu / Bodem 0.090 unit/Hari
Nilai HSPK :
24.09.01.04 Pengukuran Saluran MC untuk Saluran km
Terbuka
Tenaga:
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Bahan:
20.01.01.08.12.06 Batu Kali 1.000 m3
20.01.01.61.02 Kawat Galvanis 8.334 kg
Peralatan:
02.04.02.08.06.17 Tang Pemotong Kawat 0.010 Buah
02.04.02.07.08.36 Palu kayu/besi 0.010 Buah
Nilai HSPK :
24.09.01.06 Bronjong Kawat Galvanis D = 4 mm m3
(Uk : 0.50 x 1.00 x 2.00 m)
Tenaga:
22.01.01.01.09 Mandor Penganyaman 0.026 O.H
22.01.01.03.12 Penganyam 0.704 O.H
22.01.01.03.08 Pekerja Penganyam 0.576 O.H
22.01.01.01.09 Mandor Pengisi 0.024 O.H
22.01.01.03.08 Pekerja Pengisi 1.382 O.H
Bahan:
20.01.01.08.12.06 Batu Kali 1.000 m3
20.01.01.61.02 Kawat Galvanis 15.000 kg
Peralatan:
02.04.02.08.06.17 Tang Pemotong Kawat 0.010 Buah
02.04.02.07.08.36 Palu kayu/besi 0.010 Buah
Nilai HSPK :
24.09.01.07 Pengadaan Bronjong Kawat Buah
Galvanis D = 4 mm (Uk: 0.50 x 1,00
x 2,00 m)
Tenaga:
22.01.01.01.09 Mandor Penganyaman 0.026 O.H
22.01.01.03.12 Penganyam 0.704 O.H
22.01.01.03.08 Pekerja Penganyam 0.576 O.H
Bahan:
20.01.01.61.02 Kawat Galvanis 15.000 kg
Peralatan:
02.04.02.08.06.17 Tang Pemotong Kawat 0.010 Buah
02.04.02.07.08.36 Palu kayu/besi 0.010 Buah
Nilai HSPK :
24.09.01.08 Gebalan Rumput m2
Tenaga:
22.01.01.01.09 Mandor 0.010 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 0.144 O.H
Bahan:
20.05.06.20.16 Gebalan Rumput 1.000 m2
Peralatan:
20.01.01.62.05 Tusuk Bambu 0.020 Buah
21.02.01.02.13 Gerobak 0.005 unit/Hari
Nilai HSPK :
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Peralatan:
21.02.01.01.03 Timbris 0.900 unit/Hari
21.02.01.02.16 Kereta Dorong 0.042 unit/Hari
21.02.01.02.09 Ganco 0.050 unit/Hari
20.01.01.62.03 Keranjang 0.225 Buah
Nilai HSPK :
24.09.01.11 Pendongkelan Pohon Keliling > 0.75 M Batang
Tenaga:
22.01.01.01.09 Mandor 0.400 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 3.000 O.H
Peralatan:
21.02.01.02.12 Gergaji Kayu 0.034 unit/Hari
21.02.01.02.26 Sabit Besar 0.040 unit/Hari
21.02.01.02.09 Ganco 0.050 unit/Hari
Nilai HSPK :
24.09.01.12 Pendongkelan Pohon Keliling > 0.75 M dan Batang
Menimbun Kembali Bekas Dongkelan
Tenaga:
22.01.01.01.09 Mandor 0.412 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 3.330 O.H
Bahan:
20.01.01.05.05 Tanah Urug 1.200 m3
Peralatan:
21.02.01.01.03 Timbris 1.200 unit/Hari
21.02.01.02.16 Kereta Dorong 0.042 unit/Hari
21.02.01.02.12 Gergaji Kayu 0.050 unit/Hari
21.02.01.02.09 Ganco 0.034 unit/Hari
21.02.01.02.26 Sabit Besar 0.040 unit/Hari
Nilai HSPK :
24.09.01.13 Pekerjaan Tiang Besi Siku 50.50.3 m1
Tenaga:
22.01.01.01.09 Mandor 0.015 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 0.350 O.H
Bahan:
20.01.01.13.10 Baja Siku 50.50.3 1.100 m1
20.01.01.37.01 Baut Angker 2.000 Buah
Nilai HSPK :
24.09.01.14 Pekerjaan Teralis Besi m2
Tenaga:
22.01.01.01.09 Mandor 0.006 O.H
22.01.01.01.06 Kepala Tukang Las 0.012 O.H
22.01.01.02.09 Tukang Las 1.200 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 1.200 O.H
Bahan:
20.01.01.13.11 Baja Strip 2 x 3 1.150 m2
Pemerintah Kabupaten Madiun
- 87 -
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Nilai HSPK :
24.09.01.15 Stoplog Kayu Balau / Tahun m3
Tenaga:
22.01.01.01.09 Mandor 0.144 O.H
22.01.01.01.01 Kepala Tukang Batu 0.072 O.H
22.01.01.02.01 Tukang Batu 1.440 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 5.760 O.H
Bahan:
20.01.01.62.40 Kayu Balau / Tahun 1.000 m3
Peralatan:
21.02.01.02.21 Bodem 0.050 unit/Hari
21.02.01.02.02 Alat Bantu 0.036 Unit
Nilai HSPK :
24.09.01.16 Pengadaan dan Pemasangan Pompa Unit
Persiapan Pompa & Perlengkapannya Unit
TENAGA
22.01.01.01.09 Mandor 0.050 O.H
22.01.01.03.03 Mekanik Pompa 0.250 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 0.500 O.H
Koef. SATUAN
NOMOR URAIAN KEGIATAN
ALAT
21.02.01.02.01 Sikat baja, Isolasi, Drat Dll 1.000 Unit
20.02.01.08.06 Gear Box Oil 5.000 Liter
Nilai HSPK :
Angkutan Pompa & Perlengkapannya Unit
TENAGA
21.02.03.01.04 Angkutan ke Lokasi 0.500 Unit
22.01.01.03.08 Biaya Bongkar Muat 4 Orang 2.000 O.H
Pemasangan & Pengelasan Pompa Nilai HSPK :
Perlengkapannya Unit
TENAGA
22.01.01.01.09 Mandor 0.400 O.H
22.01.01.03.03 Mekanik Pompa 1.000 O.H
22.01.01.03.08 Pekerja 4.000 O.H
ALAT
21.02.01.01.11 Sewa / Truk Crane 1.000 Hari
20.05.06.20.18 Grease, Pacing Dll 1.000 set
21.02.03.01.13 Sewa / Operasional Mesin Las 1.000 Jam
Bahan Las, Bahan lain 1.000 set
Nilai HSPK :
Trial Run Pompa Unit
TENAGA
22.01.01.01.09 Mandor 0.100 O.H
22.01.01.03.03 Mekanik Pompa 1.000 O.H
ALAT
20.05.06.20.17 Gland Pacing, Fuel Filter, Air Filter Dll 1.000 Set
Nilai HSPK :
24.09.01.17 Pengadaan Mesin Penggerak dan Unit
Pemasangan perlengkapannya
Persiapan Pompa, Mesin & Unit
Perlengkapannya
TENAGA
22.01.01.01.09 Mandor 0.050 O.H
22.01.01.03.03 Mekanik Pompa 0.250 O.H
22.01.01.03.08 Pekerja Tak Trampil 0.500 O.H
ALAT
20.02.01.08.04 Minyak Pelumas Mesin 15.000 Liter
21.02.01.02.01 Sikat baja, Isolasi, Drat Dll 1.000 Unit
20.02.01.08.07 Gear Box Oil 5.000 Liter
Nilai HSPK :
Angkutan Pompa Mesin & Unit
Perlengkapannya
TENAGA
21.02.03.01.04 Angkutan ke Lokasi 0.500 Unit
22.01.01.03.08 Pekerja Tak Trampil 2.000 O.H
Nilai HSPK :
Pemerintah Kabupaten Madiun
- 89 -
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Koef. SATUAN
NOMOR URAIAN KEGIATAN
BAHAN
20.02.01.07.06 Solar 40.000 Liter
ALAT
20.05.06.20.17 Gland Pacing, Fuel Filter, Air Filter Dll 0.500 set
Nilai HSPK :
24.09.01.18 Pembuatan Pintu Air Type A Buah
(B=1950mm, H=2600mm,
H'=5550mm)
Tenaga:
Ongkos Kerja Konstruksi 1910.000 kg
Ongkos Kerja Mesin 574.000 kg
Ongkos Kerja Kayu 0.955 m3
Ongkos Sandblasting dan Cat 42.000 m2
12.165 m2
Ongkos Pengecatan Tanpa Sandblasting
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Koef. SATUAN
NOMOR URAIAN KEGIATAN
Koef. SATUAN
NOMOR URAIAN KEGIATAN
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 25,000.00
Rp 65,000.00 Rp 48,750.00
Rp 5,386,100.00 Rp 10,772.20
Rp 28,200.00 Rp 564.00
Rp - Rp -
Rp 60,750.00 Rp 15,187.50
Rp - Rp -
Rp 6,150.00 Rp 184.50
Nilai HSPK : Rp 100,458.20
Rp 100,000.00 Rp 150,000.00
Rp 65,000.00 Rp 292,500.00
Rp 5,386,100.00 Rp 64,633.20
Rp 28,200.00 Rp 3,384.00
Rp - Rp -
Rp 60,750.00 Rp 60,750.00
Rp - Rp -
Rp 6,150.00 Rp 369.00
Nilai HSPK : Rp 571,636.20
Rp 100,000.00 Rp 200,000.00
Rp 65,000.00 Rp 390,000.00
Rp 5,386,100.00 Rp 64,633.20
Rp 28,200.00 Rp 3,384.00
Rp - Rp -
Rp 60,750.00 Rp 121,500.00
Rp - Rp -
Rp 6,150.00 Rp 553.50
Nilai HSPK : Rp 780,070.70
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 200,000.00
Rp 65,000.00 Rp 390,000.00
Rp 5,386,100.00 Rp 64,633.20
Rp 28,200.00 Rp 3,384.00
Rp - Rp -
Rp 60,750.00 Rp 121,500.00
Rp - Rp -
Rp 6,150.00 Rp 553.50
Nilai HSPK : Rp 780,070.70
Rp 60,000.00 Rp 1,560.00
Rp 40,000.00 Rp 28,160.00
Rp 65,000.00 Rp 37,440.00
Rp 60,000.00 Rp 1,440.00
Rp 65,000.00 Rp 89,830.00
HARGA
HARGA
SATUAN
Rp 112,000.00 Rp 112,000.00
Rp 16,500.00 Rp 137,511.00
Rp - Rp -
Rp - Rp -
Nilai HSPK : Rp 407,941.00
Rp 60,000.00 Rp 1,560.00
Rp 40,000.00 Rp 28,160.00
Rp 65,000.00 Rp 37,440.00
Rp 60,000.00 Rp 1,440.00
Rp 65,000.00 Rp 89,830.00
Rp 112,000.00 Rp 112,000.00
Rp 16,500.00 Rp 247,500.00
Rp - Rp -
Rp - Rp -
Nilai HSPK : Rp 517,930.00
Rp 60,000.00 Rp 1,560.00
Rp 40,000.00 Rp 28,160.00
Rp 65,000.00 Rp 37,440.00
Rp 16,500.00 Rp 247,500.00
Rp - Rp -
Rp - Rp -
Nilai HSPK : Rp 314,660.00
Rp 60,000.00 Rp 600.00
Rp 65,000.00 Rp 9,360.00
Rp - Rp -
Rp 2,250.00 Rp 45.00
Rp 40,650.00 Rp 203.25
Nilai HSPK : Rp 10,208.25
HARGA
HARGA
SATUAN
Rp 60,000.00 Rp 2,700.00
Rp 65,000.00 Rp 86,255.00
Rp 6,850.00 Rp 342.50
Rp 12,300.00 Rp 2,767.50
Nilai HSPK : Rp 92,065.00
Rp 60,000.00 Rp 3,240.00
Rp 65,000.00 Rp 102,375.00
Rp 75,000.00 Rp 67,500.00
HARGA
HARGA
SATUAN
Rp 33,600.00 Rp 30,240.00
Rp 7,150.00 Rp 300.30
Rp 6,850.00 Rp 342.50
Rp 12,300.00 Rp 2,767.50
Nilai HSPK : Rp 206,765.30
Rp 60,000.00 Rp 24,000.00
Rp 65,000.00 Rp 195,000.00
Rp 6,850.00 Rp 232.90
Rp 15,050.00 Rp 602.00
Rp 6,850.00 Rp 342.50
Nilai HSPK : Rp 220,177.40
Rp 60,000.00 Rp 24,720.00
Rp 65,000.00 Rp 216,450.00
Rp 75,000.00 Rp 90,000.00
Rp 33,600.00 Rp 40,320.00
Rp 7,150.00 Rp 300.30
Rp 6,850.00 Rp 342.50
Rp 6,850.00 Rp 232.90
Rp 15,050.00 Rp 602.00
Nilai HSPK : Rp 372,967.70
Rp 60,000.00 Rp 900.00
Rp 65,000.00 Rp 22,750.00
Rp 12,750.00 Rp 14,025.00
Rp - Rp -
Nilai HSPK : Rp 37,675.00
Rp 60,000.00 Rp 360.00
Rp 95,000.00 Rp 1,140.00
Rp 90,000.00 Rp 108,000.00
Rp 65,000.00 Rp 78,000.00
Rp 12,750.00 Rp 14,662.50
Pemerintah Kabupaten Madiun
- 108 -
HARGA
HARGA
SATUAN
Rp 60,000.00 Rp 8,640.00
Rp 50,000.00 Rp 3,600.00
Rp 40,000.00 Rp 57,600.00
Rp 65,000.00 Rp 374,400.00
Rp 5,386,100.00 Rp 5,386,100.00
Rp 6,150.00 Rp 307.50
Rp 98,400.00 Rp 3,542.40
Nilai HSPK : Rp 5,834,189.90
Rp 60,000.00 Rp 3,000.00
Rp 90,000.00 Rp 22,500.00
Rp 65,000.00 Rp 32,500.00
HARGA
HARGA
SATUAN
Rp 15,700.00 Rp 15,700.00
Rp - Rp -
Nilai HSPK : Rp 73,700.00
Rp 391,600.00 Rp 195,800.00
Rp 65,000.00 Rp 130,000.00
Nilai HSPK : Rp 325,800.00
Rp 60,000.00 Rp 24,000.00
Rp 90,000.00 Rp 90,000.00
Rp 65,000.00 Rp 260,000.00
Rp 989,750.00 Rp 989,750.00
Rp - Rp -
Rp 63,000.00 Rp 63,000.00
Rp 40,000.00 Rp 40,000.00
Nilai HSPK : Rp 1,363,750.00
Rp 60,000.00 Rp 6,000.00
Rp 90,000.00 Rp 90,000.00
Rp - Rp -
Nilai HSPK : Rp 96,000.00
Rp 60,000.00 Rp 3,000.00
Rp 90,000.00 Rp 22,500.00
Rp 65,000.00 Rp 32,500.00
Rp 40,000.00 Rp 600,000.00
Rp 15,700.00 Rp 15,700.00
Rp - Rp -
Nilai HSPK : Rp 673,700.00
Rp 391,600.00 Rp 195,800.00
Rp 65,000.00 Rp 130,000.00
Nilai HSPK : Rp 325,800.00
Pemerintah Kabupaten Madiun
- 110 -
HARGA
HARGA
SATUAN
Rp 60,000.00 Rp 24,000.00
Rp 90,000.00 Rp 90,000.00
Rp 90,000.00 Rp 90,000.00
Rp 65,000.00 Rp 260,000.00
Rp 989,750.00 Rp 989,750.00
Rp - Rp -
Rp 63,000.00 Rp 126,000.00
Rp 40,000.00 Rp 40,000.00
Nilai HSPK : Rp 1,619,750.00
Rp 60,000.00 Rp 60,000.00
Rp 90,000.00 Rp 90,000.00
Rp 90,000.00 Rp 90,000.00
Rp 65,000.00 Rp 130,000.00
HARGA
HARGA
SATUAN
Rp 5,750.00 Rp 230,000.00
Rp - Rp -
Nilai HSPK : Rp 600,000.00
Rp 1,250.00 Rp 2,387,500.00
Rp 6,000.00 Rp 3,444,000.00
Rp 500,000.00 Rp 477,500.00
Rp 55,000.00 Rp 2,310,000.00
Rp 27,500.00 Rp 334,537.50
Rp 700.00 Rp 1,723,400.00
Rp 500.00 Rp 1,231,500.00
Rp 500.00 Rp 1,231,500.00
Rp 12,750.00 Rp 344,250.00
Rp 13,000.00 Rp 13,026,000.00
Rp 29,100.00 Rp 1,164,000.00
Rp 12,750.00 Rp 3,748,500.00
Rp 12,750.00 Rp 6,120,000.00
Rp 10,500.00 Rp 703,500.00
Rp 25,106,250.00 Rp 2,510,625.00
Rp 12,750.00 Rp 3,723,000.00
Rp 29,100.00 Rp 2,793,600.00
Rp 10,500.00 Rp 1,953,000.00
Rp 2,520,000.00 Rp 7,560,000.00
Rp - Rp -
Rp - Rp -
Rp 167,850.00 Rp 1,174,950.00
Rp 106,600.00 Rp 106,600.00
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 7,873,350.00 Rp 7,519,049.25
Rp - Rp -
Rp - Rp -
Rp 798,940.08 Rp 271,639.63
Nilai HSPK : Rp 65,858,651.38
HARGA
HARGA
SATUAN
Rp 1,250.00 Rp 1,380,000.00
Rp 500.00 Rp 1,231,500.00
Rp 500,000.00 Rp 126,500.00
Rp 55,000.00 Rp 1,334,245.00
Rp 27,500.00 Rp 114,565.00
Rp 700.00 Rp 709,100.00
Rp 12,750.00 Rp 242,250.00
Rp 13,000.00 Rp 7,800,000.00
Rp 29,100.00 Rp 640,200.00
Rp 12,750.00 Rp 2,384,250.00
Rp 12,750.00 Rp 2,907,000.00
Rp 10,500.00 Rp 504,000.00
Rp 14,477,700.00 Rp 1,447,770.00
Rp 12,750.00 Rp 1,287,750.00
Rp 29,100.00 Rp 1,367,700.00
Rp 10,500.00 Rp 682,500.00
Rp 2,520,000.00 Rp 2,520,000.00
HARGA
HARGA
SATUAN
Rp - Rp -
Rp - Rp -
Rp 167,850.00 Rp 503,550.00
Rp 106,600.00 Rp 106,600.00
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 7,873,350.00 Rp 1,991,957.55
Rp - Rp -
Rp - Rp -
Rp 798,940.08 Rp 271,639.63
Nilai HSPK : Rp 29,553,077.18
Rp 1,250.00 Rp 931,250.00
Rp 6,000.00 Rp 768,000.00
Rp 27,500.00 Rp 388,245.00
Rp 700.00 Rp 611,100.00
Rp 500.00 Rp 436,500.00
Rp 500.00 Rp 436,500.00
Rp 12,750.00 Rp 5,520,750.00
Rp 12,750.00 Rp 2,843,250.00
Rp 12,750.00 Rp 867,000.00
Rp 10,500.00 Rp 210,000.00
Rp 62,200.00 Rp 62,200.00
Rp 9,503,200.00 Rp 950,320.00
Rp 12,750.00 Rp 879,750.00
Rp 29,100.00 Rp 669,300.00
Rp 10,500.00 Rp 378,000.00
Rp - Rp -
Rp 15,850.00 Rp 237,750.00
Rp - Rp -
Rp - Rp -
Rp 106,600.00 Rp 213,200.00
Rp - Rp -
Rp - Rp -
Rp 798,940.08 Rp 127,830.41
Nilai HSPK : Rp 16,530,945.41
Rp 1,250.00 Rp 357,500.00
Pemerintah Kabupaten Madiun
- 114 -
HARGA
HARGA
SATUAN
Rp 6,000.00 Rp 594,000.00
Rp 27,500.00 Rp 169,620.00
Rp 700.00 Rp 207,200.00
Rp 500.00 Rp 148,000.00
Rp 500.00 Rp 148,000.00
Rp 12,750.00 Rp 2,460,750.00
Rp 12,750.00 Rp 420,750.00
Rp 12,750.00 Rp 573,750.00
Rp 10,500.00 Rp 147,000.00
Rp 62,200.00 Rp 62,200.00
Rp 9,503,200.00 Rp 950,320.00
Rp 12,750.00 Rp 599,250.00
Rp 29,100.00 Rp 465,600.00
Rp 10,500.00 Rp 378,000.00
Rp - Rp -
Rp 15,850.00 Rp 174,350.00
Rp - Rp -
HARGA
HARGA
SATUAN
Rp - Rp -
Rp 106,600.00 Rp 213,200.00
Rp - Rp -
Rp - Rp -
Rp 798,940.08 Rp 79,894.01
Nilai HSPK : Rp 8,149,384.01
Rp 90,000.00 Rp 2,700,000.00
Rp 90,000.00 Rp 2,700,000.00
Rp - Rp -
Rp 65,000.00 Rp 9,750,000.00
Rp 5,750.00 Rp 5,750.00
Rp 40,000.00 Rp 800,000.00
Rp - Rp -
Nilai HSPK : Rp 15,955,750.00
Rp 60,000.00 Rp 1,800.00
Rp 50,000.00 Rp 2,100.00
Rp 55,000.00 Rp 11,550.00
Rp 40,000.00 Rp 8,400.00
Rp 90,000.00 Rp 18,900.00
Rp 45,000.00 Rp 9,450.00
Rp 30,000.00 Rp 8,400.00
Rp - Rp -
Rp 45,000.00 Rp 6,300.00
Rp 5,750.00 Rp 3,984.75
Rp 40,000.00 Rp 1,640.80
Rp - Rp -
Rp 165,350.00 Rp 7,234.06
Rp 19,150.00 Rp 2,010.75
Rp - Rp -
Rp 343,050.00 Rp 24,013.50
Nilai HSPK : Rp 105,783.86
Rp 60,000.00 Rp 1,800.00
Rp 50,000.00 Rp 2,100.00
Rp 55,000.00 Rp 11,665.50
HARGA
HARGA
SATUAN
Rp 40,000.00 Rp 8,484.00
Rp 90,000.00 Rp 18,900.00
Rp 45,000.00 Rp 9,450.00
Rp 30,000.00 Rp 8,400.00
Rp - Rp -
Rp 45,000.00 Rp 6,300.00
Rp 5,750.00 Rp 2,979.90
Rp 40,000.00 Rp 1,066.52
Rp - Rp 714.00
Rp 165,350.00 Rp 2,893.63
Rp 19,150.00 Rp 1,340.50
Rp - Rp -
Rp 343,050.00 Rp 24,013.50
Nilai HSPK : Rp 100,107.55
HARGA
HARGA
SATUAN
Rp 60,000.00 Rp 1,800.00
Rp 50,000.00 Rp 2,100.00
Rp 55,000.00 Rp 17,325.00
Rp 40,000.00 Rp 12,600.00
Rp 90,000.00 Rp 28,350.00
Rp 45,000.00 Rp 11,340.00
Rp 30,000.00 Rp 8,400.00
Rp - Rp -
Rp 45,000.00 Rp 6,300.00
Rp 5,750.00 Rp 3,984.75
Rp 40,000.00 Rp 1,640.80
Rp - Rp -
Rp 165,350.00 Rp 10,851.09
Rp 19,150.00 Rp 2,681.00
Rp - Rp -
Rp 343,050.00 Rp 24,013.50
Nilai HSPK : Rp 131,386.14
Rp 60,000.00 Rp 1,800.00
Rp 50,000.00 Rp 2,100.00
Rp 55,000.00 Rp 17,325.00
Rp 40,000.00 Rp 12,600.00
Rp 90,000.00 Rp 28,350.00
Rp 45,000.00 Rp 11,340.00
Rp 30,000.00 Rp 8,400.00
Rp - Rp -
Rp 45,000.00 Rp 6,300.00
Rp 5,750.00 Rp 3,984.75
Rp 40,000.00 Rp 1,640.80
Rp - Rp -
Rp 165,350.00 Rp 10,851.09
Rp 19,150.00 Rp 2,681.00
Rp - Rp -
Rp 343,050.00 Rp 24,013.50
Nilai HSPK : Rp 131,386.14
HARGA
HARGA
SATUAN
Rp 60,000.00 Rp 1,800.00
Rp 50,000.00 Rp 4,350.00
Rp 55,000.00 Rp 23,925.00
Rp 40,000.00 Rp 17,400.00
Rp 90,000.00 Rp 39,150.00
Rp 45,000.00 Rp 19,575.00
Rp 30,000.00 Rp 17,400.00
Rp - Rp -
Rp 45,000.00 Rp 6,300.00
Rp 5,750.00 Rp 8,254.13
Rp 40,000.00 Rp 3,398.80
Rp - Rp -
Rp 165,350.00 Rp 14,984.84
Rp - Rp -
Rp 343,050.00 Rp 24,871.13
Nilai HSPK : Rp 181,408.89
HARGA
HARGA
SATUAN
Rp 60,000.00 Rp 1,800.00
Rp 50,000.00 Rp 1,500.00
Rp 55,000.00 Rp 5,500.00
Rp 40,000.00 Rp 4,000.00
Rp 90,000.00 Rp 9,000.00
Rp 45,000.00 Rp 4,500.00
Rp 30,000.00 Rp 12,000.00
Rp - Rp -
Rp 45,000.00 Rp 4,500.00
Rp 3,172,400.00 Rp 528,733.33
Rp 5,750.00 Rp 8,254.13
Rp 40,000.00 Rp 4,688.00
Rp - Rp -
Rp 165,350.00 Rp 23,975.75
Rp - Rp -
Rp 343,050.00 Rp 24,871.13
Nilai HSPK : Rp 633,322.33
Rp 60,000.00 Rp 1,200.00
Rp 50,000.00 Rp 1,087.50
Rp 55,000.00 Rp 3,987.50
Rp 40,000.00 Rp 2,900.00
Rp 90,000.00 Rp 6,525.00
Rp 45,000.00 Rp 3,262.50
Rp 30,000.00 Rp 8,700.00
Rp - Rp -
Rp 45,000.00 Rp 3,262.50
Rp 1,004,700.00 Rp 167,450.00
Rp 5,750.00 Rp 8,254.13
Rp 40,000.00 Rp 3,398.80
Rp - Rp -
Rp 165,350.00 Rp 23,975.75
Rp - Rp -
Rp 343,050.00 Rp 24,871.13
Nilai HSPK : Rp 258,874.80
HARGA
HARGA
SATUAN
Rp 60,000.00 Rp 1,200.00
Rp 50,000.00 Rp 1,087.50
Rp 55,000.00 Rp 3,987.50
Rp 40,000.00 Rp 2,900.00
Rp 90,000.00 Rp 6,525.00
Rp 45,000.00 Rp 3,262.50
Rp 30,000.00 Rp 8,700.00
Rp - Rp -
Rp 45,000.00 Rp 3,262.50
Rp 323,200.00 Rp 323,200.00
Rp 5,750.00 Rp 8,254.13
Rp 40,000.00 Rp 3,398.80
Rp - Rp -
Rp 165,350.00 Rp 2,996.97
Rp - Rp -
Rp 343,050.00 Rp 24,871.13
Nilai HSPK : Rp 393,646.02
HARGA
HARGA
SATUAN
Rp 60,000.00 Rp 1,200.00
Rp 50,000.00 Rp 1,087.50
Rp 55,000.00 Rp 13,750.00
Rp 40,000.00 Rp 10,000.00
Rp 90,000.00 Rp 22,500.00
Rp 45,000.00 Rp 11,250.00
Rp 30,000.00 Rp 30,000.00
Rp - Rp -
Rp 45,000.00 Rp 11,250.00
Rp 5,750.00 Rp 28,462.50
Rp 40,000.00 Rp 11,720.00
Rp - Rp -
Rp 165,350.00 Rp 10,334.38
Rp 19,150.00 Rp 14,362.50
Rp 186,850.00 Rp 140,137.50
Rp 343,050.00 Rp 85,762.50
Nilai HSPK : Rp 391,816.88
Rp 55,000.00 Rp 6,875.00
Rp 90,000.00 Rp 11,250.00
Rp 90,000.00 Rp 11,250.00
Rp 30,000.00 Rp 15,000.00
Rp 45,000.00 Rp 5,625.00
Rp 5,750.00 Rp 14,231.25
Rp 40,000.00 Rp 11,720.00
Rp - Rp -
Rp 18,218.00 Rp 6,831.75
Rp 343,050.00 Rp 42,881.25
Nilai HSPK : Rp 125,664.25
Err:509 Err:509
Rp 12,049.00 Rp 1,204,900.00
Rp 168,918.50 Rp 1,689,185.00
Nilai HSPK : Err:509
HARGA
HARGA
SATUAN
Err:509 Err:509
Rp 12,049.00 Rp 1,506,125.00
Rp 168,918.50 Rp 1,689,185.00
Nilai HSPK : Err:509
Err:509 Err:509
Rp 12,049.00 Rp 1,204,900.00
Rp 236,180.25 Rp 2,361,802.50
Nilai HSPK : Err:509
Err:509 Err:509
Rp 12,049.00 Rp 1,506,125.00
Rp 236,180.25 Rp 2,361,802.50
Nilai HSPK : Err:509
HARGA
HARGA
SATUAN
Err:509 Err:509
Rp 12,049.00 Rp 1,204,900.00
Rp 352,713.00 Rp 3,527,130.00
Nilai HSPK : Err:509
Err:509 Err:509
Rp 12,049.00 Rp 1,506,125.00
Rp 352,713.00 Rp 3,527,130.00
Nilai HSPK : Err:509
Err:509 Err:509
Rp 12,049.00 Rp 1,204,900.00
Rp 360,813.00 Rp 3,608,130.00
Nilai HSPK : Err:509
Err:509 Err:509
Rp 12,049.00 Rp 1,506,125.00
Rp 360,813.00 Rp 3,608,130.00
Nilai HSPK : Err:509
NON KONSTRUKSI
J Pertamanan dan Kebersihan
24.10.01 Pertamanan
24.10.01.01 Penyiapan bibit tanaman/ Pemutaran tanaman
m3
(Volume 0.063 m3)
Tenaga:
22.01.01.02.15 Tukang Tanam 0.2000 O.H
22.01.01.03.07 Pekerja Semi Terampil 0.1000 O.H
Peralatan:
02.05.01.03.22.10 Gelangsing 1.0000 Buah
20.03.15.11.02.02 Tali Rafiah 0.1500 Kg
Nilai HSPK :
24.10.01.02 Tanah Taman (Terolah) m3
Tenaga:
22.01.01.01.09 Mandor 0.0100 O.H
22.01.01.03.09 Pekerja Terampil 0.2500 O.H
Bahan:
05.19.03.14.52 Stek Non Lokal 1.0000 btg
Nilai HSPK :
24.10.01.03 Pengapuran dan pengecatan 1 batang pohon Batang
Tenaga:
22.01.01.01.09 Mandor 0.0031 O.H
22.01.01.01.03 Kepala Tukang cat 0.0031 O.H
22.01.01.02.03 Tukang cat 0.0313 O.H
Bahan:
20.01.01.09.02.02 Cat Tembok 0.2500 Kg
20.01.01.09.03.09 Cat kayu Emco 0.0500 Kg
20.01.01.09.04.05 Minyak Cat / Afduner 0.0150 ltr
Nilai HSPK :
24.10.01.04 Membabat/Merapikan Rumput t<20 cm m2
Tenaga:
22.01.01.01.09 Mandor 0.0001 O.H
22.01.01.02.15 Tukang Tanam 0.0100 O.H
22.01.01.03.08 Pekerja Tak Terampil 0.0100 O.H
Nilai HSPK :
24.10.01.05 Membabat/Merapikan Rumput
m2
20cm< t <50 cm
Tenaga:
22.01.01.01.09 Mandor 0.0002 O.H
22.01.01.02.15 Tukang Tanam 0.0200 O.H
22.01.01.03.08 Pekerja Tak Terampil 0.0100 O.H
Nilai HSPK :
24.10.01.06 Membabat/Merapikan Rumput t>50 cm m2
Tenaga:
22.01.01.01.09 Mandor 0.0003 O.H
Pemerintah Kabupaten Madiun
- 94 -
24.10.03 Kebersihan
24.10.03.01 Pekerjaan Angkutan Sampah m3
Tenaga:
22.01.01.03.14 Pengemudi / Sopir 0.0185 O.H
22.01.01.03.11 Pembantu Sopir 0.0185 O.H
22.01.01.03.08 Pekerja/Buruh Tak Terampil 0.0556 O.H
Peralatan:
21.02.04.17.02 Masker Plastik 0.0015 buah
21.02.04.17.03 Sarung Tangan 0.0030 buah
21.02.04.17.04 Sepatu boot 0.0005 buah
21.02.04.17.06 Topi Ranger 0.0005 buah
21.02.01.02.29 Sekop 0.0015 Unit/Hari
21.02.04.17.05 Katel pack 0.0010 Buah
02.05.02.01.10.03 Garuk+Gagang 0.0015 buah
02.05.02.03.03.03 Keranjang Rotan 0.0030 buah
21.02.03.01.02 Sewa Truck 0.0093 Jam
20.02.01.07.06 Solar 0.5093 Liter
Nilai HSPK :
24.10.03.02 Pekerjaan Incinerator mini m3
Tenaga:
22.01.01.01.09 Mandor 0.0909 O.H
22.01.01.03.09 Pekerja Terampil 0.0909 O.H
22.01.01.03.08 Pekerja/Buruh Tak Terampil 0.2730 O.H
Peralatan:
21.02.04.17.02 Masker Plastik 0.0150 buah
21.02.04.17.03 Sarung Tangan 0.0598 buah
21.02.04.17.04 Sepatu boot 0.0970 buah
21.02.04.17.05 Katel pack 0.0996 buah
21.02.04.17.06 Topi Ranger 0.0499 buah
21.02.01.02.29 Sekop 0.0100 Unit/Hari
02.05.02.01.10.03 Garuk+Gagang 0.0199 buah
02.05.02.03.03.03 Keranjang Rotan 0.0299 buah
20.02.01.07.02 Minyak Tanah 4.8000 ltr
21.01.05.01.03 Listrik 0.4000 Kwh
21.01.05.01.02 Air 0.1091 m3
02.05.02.01.10.05 Sogrok Besi 0.0199 buah
Nilai HSPK :
24.10.03.03 Pekerjaan Penyapuan m2
Tenaga:
22.01.01.01.08 Kepala Tukang Sapu 0.0002 O.H
22.01.01.02.14 Tukang Sapu 0.0020 O.H
Peralatan:
21.02.04.17.02 Masker Plastik 0.0013 buah
21.02.04.17.03 Sarung Tangan 0.0008 buah
21.02.04.17.04 Sepatu Karet 0.0004 buah
HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 18,000.00
Rp 67,500.00 Rp 6,750.00
Rp - Rp -
Rp 10,550.00 Rp 1,582.50
Nilai HSPK : Rp 26,332.50
Rp 100,000.00 Rp 1,000.00
Rp 70,000.00 Rp 17,500.00
Rp - Rp -
Nilai HSPK : Rp 18,500.00
Rp 100,000.00 Rp 310.00
Rp 95,000.00 Rp 294.50
Rp 90,000.00 Rp 2,812.50
Rp - Rp -
Rp 61,550.00 Rp 3,077.50
Rp 11,700.00 Rp 175.50
Nilai HSPK : Rp 6,670.00
Rp 100,000.00 Rp 10.00
Rp 90,000.00 Rp 900.00
Rp 65,000.00 Rp 650.00
Nilai HSPK : Rp 1,560.00
Rp 100,000.00 Rp 20.00
Rp 90,000.00 Rp 1,800.00
Rp 65,000.00 Rp 650.00
Nilai HSPK : Rp 2,470.00
Rp 100,000.00 Rp 30.00
Pemerintah Kabupaten Madiun
- 111 -
HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 2,700.00
Rp 65,000.00 Rp 1,300.00
Nilai HSPK : Rp 4,030.00
Rp 100,000.00 Rp 30.00
Rp 90,000.00 Rp 2,700.00
Rp 65,000.00 Rp 2,275.00
Nilai HSPK : Rp 5,005.00
Rp 90,000.00 Rp 90.00
Rp 5,750.00 Rp 316.25
Rp - Rp -
Rp 86,650.00 Rp 5,632.25
Nilai HSPK : Rp 6,038.50
HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 450.00
Rp 5,750.00 Rp 316.25
Rp - Rp -
Rp 43,350.00 Rp 3,684.75
Nilai HSPK : Rp 4,451.00
Rp 90,000.00 Rp 450.00
Rp 5,750.00 Rp 373.75
Rp - Rp -
Rp 43,350.00 Rp 4,551.75
Nilai HSPK : Rp 5,375.50
Rp 100,000.00 Rp 1,000.00
Rp 65,000.00 Rp 9,750.00
Rp - Rp -
Nilai HSPK : Rp 10,750.00
Rp 100,000.00 Rp 1,000.00
Rp 65,000.00 Rp 9,750.00
Rp - Rp -
Nilai HSPK : Rp 10,750.00
Rp 100,000.00 Rp 350.00
Rp 90,000.00 Rp 9,000.00
Nilai HSPK : Rp 9,350.00
Rp 100,000.00 Rp 500.00
Rp 90,000.00 Rp 9,000.00
Nilai HSPK : Rp 3,300.00
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 2,000.00
Rp 90,000.00 Rp 36,000.00
Nilai HSPK : Rp 38,000.00
Rp 100,000.00 Rp 10,000.00
Rp 90,000.00 Rp 29,700.00
Nilai HSPK : Rp 39,700.00
Rp 90,000.00 Rp 3,600.00
Rp 65,000.00 Rp 2,600.00
Rp 129,000.00 Rp 129.00
Rp - Rp -
Rp - Rp -
Nilai HSPK : Rp 6,329.00
Rp 100,000.00 Rp 1,000.00
Rp 90,000.00 Rp 29,700.00
Nilai HSPK : Rp 30,700.00
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 130.00
Rp 65,000.00 Rp 260.00
Rp - Rp -
Rp - Rp -
Rp 6,850.00 Rp 27.40
Rp 10,750.00 Rp 21.50
Nilai HSPK : Rp 438.90
Rp 100,000.00 Rp 100.00
Rp 65,000.00 Rp 385.45
Rp - Rp -
Rp - Rp -
Nilai HSPK : Rp 485.45
Rp 100,000.00 Rp 140.00
Rp 90,000.00 Rp 21.60
Rp 70,000.00 Rp 560.00
Rp 7,350.00 Rp 20.58
Rp 4,150.00 Rp 9.96
Rp 15,050.00 Rp 36.12
Rp 391,600.00 Rp 93.98
Rp - Rp -
Rp - Rp -
Nilai HSPK : Rp 882.24
Rp 40,000.00 Rp 6,666.67
Rp 90,000.00 Rp 30,000.00
Rp 65,000.00 Rp 86,666.67
Rp 70,000.00 Rp 23,333.33
Rp 70,000.00 Rp 23,333.33
Rp 7,350.00 Rp 7,350.00
HARGA
HARGA
SATUAN
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 9,583.33
Nilai HSPK : Rp 195,558.33
Rp 40,000.00 Rp 3,333.33
Rp 90,000.00 Rp 15,000.00
Rp 65,000.00 Rp 43,333.33
Rp 70,000.00 Rp 11,666.67
Rp 70,000.00 Rp 11,666.67
Rp 7,350.00 Rp 3,675.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 4,791.67
Nilai HSPK : Rp 102,091.67
HARGA
HARGA
SATUAN
Rp 40,000.00 Rp 10,000.00
Rp 90,000.00 Rp 45,000.00
Rp 65,000.00 Rp 130,000.00
Rp 70,000.00 Rp 35,000.00
Rp 70,000.00 Rp 35,000.00
Rp 7,350.00 Rp 11,025.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 14,375.00
Nilai HSPK : Rp 289,025.00
Rp 40,000.00 Rp 5,000.00
Rp 90,000.00 Rp 22,500.00
Rp 65,000.00 Rp 65,000.00
Rp 70,000.00 Rp 17,500.00
Rp 70,000.00 Rp 17,500.00
Rp 7,350.00 Rp 5,512.50
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 7,187.50
Nilai HSPK : Rp 148,825.00
Rp 40,000.00 Rp 4,000.00
Rp 90,000.00 Rp 18,000.00
Rp 65,000.00 Rp 52,000.00
Rp 70,000.00 Rp 14,000.00
Rp 70,000.00 Rp 14,000.00
Rp 7,350.00 Rp 4,410.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 5,750.00
Nilai HSPK : Rp 120,785.00
Rp 40,000.00 Rp 2,000.00
HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 9,000.00
Rp 65,000.00 Rp 26,000.00
Rp 70,000.00 Rp 7,000.00
Rp 70,000.00 Rp 7,000.00
Rp 7,350.00 Rp 2,205.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 2,875.00
Nilai HSPK : Rp 64,705.00
Rp 40,000.00 Rp 6,666.67
Rp 90,000.00 Rp 30,000.00
Rp 65,000.00 Rp 86,666.67
Rp 70,000.00 Rp 23,333.33
Rp 70,000.00 Rp 23,333.33
Rp 7,350.00 Rp 7,350.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 9,583.33
Nilai HSPK : Rp 195,558.33
HARGA
HARGA
SATUAN
Rp 40,000.00 Rp 4,000.00
Rp 90,000.00 Rp 18,000.00
Rp 65,000.00 Rp 52,000.00
Rp 70,000.00 Rp 14,000.00
Rp 70,000.00 Rp 14,000.00
Rp 7,350.00 Rp 4,410.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 5,750.00
Nilai HSPK : Rp 120,785.00
Rp 40,000.00 Rp 10,000.00
Rp 90,000.00 Rp 45,000.00
Rp 65,000.00 Rp 130,000.00
Rp 70,000.00 Rp 35,000.00
Rp 70,000.00 Rp 35,000.00
Rp 7,350.00 Rp 11,025.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 14,375.00
Nilai HSPK : Rp 289,025.00
Rp 40,000.00 Rp 5,000.00
Rp 90,000.00 Rp 22,500.00
Rp 65,000.00 Rp 65,000.00
Rp 70,000.00 Rp 17,500.00
Rp 70,000.00 Rp 17,500.00
Rp 7,350.00 Rp 5,512.50
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 7,187.50
Nilai HSPK : Rp 148,825.00
Rp 40,000.00 Rp 20,000.00
HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 90,000.00
Rp 65,000.00 Rp 260,000.00
Rp 70,000.00 Rp 70,000.00
Rp 70,000.00 Rp 70,000.00
Rp 7,350.00 Rp 22,050.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 28,750.00
Nilai HSPK : Rp 569,425.00
Rp 40,000.00 Rp 10,000.00
Rp 90,000.00 Rp 45,000.00
Rp 65,000.00 Rp 130,000.00
Rp 70,000.00 Rp 35,000.00
Rp 70,000.00 Rp 35,000.00
Rp 7,350.00 Rp 11,025.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 14,375.00
Nilai HSPK : Rp 289,025.00
HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 1,666.80
Rp 78,800.00 Rp 1,459.38
Rp 65,000.00 Rp 3,611.40
Rp 2,750.00 Rp 4.18
Rp 2,750.00 Rp 8.36
Rp 6,800.00 Rp 3.47
Rp 6,800.00 Rp 3.47
Rp 13,650.00 Rp 20.48
Rp 67,500.00 Rp 68.18
Rp - Rp -
Rp - Rp -
Rp 280,000.00 Rp 2,592.80
Rp 5,750.00 Rp 2,928.25
Nilai HSPK : Rp 12,366.75
Rp 100,000.00 Rp 9,090.00
Rp 70,000.00 Rp 6,363.00
Rp 65,000.00 Rp 17,745.00
Rp 2,750.00 Rp 41.11
Rp 2,750.00 Rp 164.45
Rp 6,800.00 Rp 659.57
Rp 67,500.00 Rp 6,723.00
Rp 6,800.00 Rp 339.32
Rp 13,650.00 Rp 135.95
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 900.00 Rp 360.00
Rp 3,100.00 Rp 338.21
Rp - Rp -
Nilai HSPK : Rp 41,959.62
Rp 95,000.00 Rp 19.00
Rp 90,000.00 Rp 180.00
Rp 2,750.00 Rp 3.63
Rp 2,750.00 Rp 2.12
Rp 6,800.00 Rp 3.05
HARGA
HARGA
SATUAN
Rp 6,800.00 Rp 2.99
Rp 10,200.00 Rp 4.49
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 67,500.00 Rp 33.75
Nilai HSPK : Rp 249.03
Rp 100,000.00 Rp 6,363.64
Rp 70,000.00 Rp 4,454.55
Rp 65,000.00 Rp 24,818.18
Rp 4,778.00 Rp 4,778.00
Rp 2,750.00 Rp 6.58
Rp 2,750.00 Rp 16.45
Rp 6,800.00 Rp 6.60
Rp 67,500.00 Rp 107.60
Rp 6,800.00 Rp 6.78
Rp 13,650.00 Rp 1.36
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 3,100.00 Rp 338.18
Rp 5,750.00 Rp 10,454.55
Rp - Rp -
Nilai HSPK : Rp 51,352.44
HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 720,000.00
Rp 65,000.00 Rp 520,000.00
Rp 90,000.00 Rp 720,000.00
Rp 65,000.00 Rp 520,000.00
Rp 242,250.00 Rp 1,938,000.00
Rp 110,000.00 Rp 3,080,000.00
Rp - Rp -
Rp 11,700.00 Rp 81,900.00
Rp 28,600.00 Rp 429,000.00
Rp 5,000.00 Rp 125,000.00
Rp 41,700.00 Rp 625,500.00
Rp 80,412.50 Rp 3,859,800.00
Nilai HSPK : Rp 12,619,200.00
Rp 90,000.00 Rp 180,000.00
Rp 65,000.00 Rp 130,000.00
Rp 90,000.00 Rp 180,000.00
Rp 65,000.00 Rp 130,000.00
Rp 242,250.00 Rp 242,250.00
Rp 110,000.00 Rp 220,000.00
Rp - Rp -
Rp 11,700.00 Rp 35,100.00
Rp 28,600.00 Rp 85,800.00
Rp 5,000.00 Rp 50,000.00
Rp 41,700.00 Rp 125,100.00
Rp 215,575.00 Rp 2,155,750.00
Nilai HSPK : Rp 3,534,000.00
1 Rb /BTG
Rp 100,000.00 Rp 30,000.00
Rp 90,000.00 Rp 270,000.00
Rp 3,000.00 Rp 48,000.00
Err:509 Err:509
Rp - Rp -
Rp - Rp -
HARGA
HARGA
SATUAN
Rp 391,600.00 Rp 391,600.00
Rp 27,250.00 Rp 27,250.00
Rp 10,750.00 Rp 32,250.00
Rp 750.00 Rp 2,250.00
Rp 63,000.00 Rp 189,000.00
Nilai HSPK : Err:509
1 Rb /BTG
Rp 100,000.00 Rp 80,000.00
Rp 90,000.00 Rp 720,000.00
Rp 3,000.00 Rp 114,000.00
Rp 750.00 Rp 6,000.00
Rp 63,000.00 Rp 567,000.00
Rp 2,450.00 Rp 19,600.00
Rp 27,250.00 Rp 54,500.00
Rp 757,275.00 Rp 113,591.25
Nilai HSPK : Rp 1,674,691.25
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 80.00
Rp 90,000.00 Rp 720.00
Rp 3,000.00 Rp 108.00
Rp 98,400.00 Rp 246.00
Rp 792,000.00 Rp 792.00
Rp 27,250.00 Rp 54.50
Nilai HSPK : Rp 2,000.50
Rp 100,000.00 Rp 30.00
Rp 70,000.00 Rp 210.00
Rp - Rp -
Rp 3,000.00 Rp 48.00
Err:509 Err:509
Rp - Rp -
Rp 391,600.00 Rp 391.60
Rp 27,250.00 Rp 27.25
Rp 10,750.00 Rp 32.25
Rp 98,400.00 Rp 295.20
Nilai HSPK : Err:509
Rp 95,000.00 Rp 285,000.00
Rp 90,000.00 Rp 450,000.00
Rp 65,000.00 Rp 1,300,000.00
Rp 121,000.00 Rp 363,000.00
Rp - Rp -
Rp 41,700.00 Rp 208,500.00
Rp 5,000.00 Rp 125,000.00
Nilai HSPK : Rp 2,731,500.00
Rp 95,000.00 Rp 285,000.00
Rp 90,000.00 Rp 450,000.00
Rp 90,000.00 Rp 900,000.00
HARGA
HARGA
SATUAN
Rp 65,000.00 Rp 1,625,000.00
Rp 121,000.00 Rp 363,000.00
Rp - Rp -
Rp 41,700.00 Rp 208,500.00
Rp 5,000.00 Rp 150,000.00
Rp - Rp -
Rp 26,450.00 Rp 105,800.00
Rp 12,750.00 Rp 107,804.44
Nilai HSPK : Rp 4,195,104.44
Rp 95,000.00 Rp 285,000.00
Rp 90,000.00 Rp 450,000.00
Rp 90,000.00 Rp 1,350,000.00
Rp 65,000.00 Rp 1,950,000.00
Rp 121,000.00 Rp 363,000.00
Rp - Rp -
Rp 41,700.00 Rp 208,500.00
Rp 5,000.00 Rp 200,000.00
Rp - Rp -
Rp 26,450.00 Rp 132,250.00
Rp 12,750.00 Rp 216,897.20
Nilai HSPK : Rp 5,155,647.20
HARGA
HARGA
SATUAN
Rp 95,000.00 Rp 285,000.00
Rp 90,000.00 Rp 450,000.00
Rp 90,000.00 Rp 1,800,000.00
Rp 65,000.00 Rp 2,275,000.00
Rp 121,000.00 Rp 363,000.00
Rp - Rp -
Rp 41,700.00 Rp 208,500.00
Rp 5,000.00 Rp 250,000.00
Rp - Rp -
Rp 26,450.00 Rp 158,700.00
Rp 12,750.00 Rp 431,644.88
Nilai HSPK : Rp 6,221,844.88
I. Pengadaan
20.03.06.19.37 Kontroller Lampu Peringatan 1.0000 set
20.03.06.19.10 Box Lampu 3 Aspek LED 20 Cm 2.0000 set
20.03.06.18.01 Tiang Over Head 6.4.3" 1.0000 Batang
20.03.06.19.01 Armatur Box Lampu 4.0000 Buah
20.03.06.19.52 Patok Pengaman 4" BSB 3.0000 Buah
20.03.06.19.64 Terminal Kabel Besar 1.0000 Buah
20.03.06.01.03.03 Kabel NYM 1.5 mm 30.0000 meter
20.03.06.01.11.02 Kabel SR / Twister 50.0000 meter
20.03.06.19.35 Konektor Kabel 4.0000 Buah
20.03.06.19.62 Service Kabel SR 4.0000 Buah
20.03.06.19. Biaya Penyambungan PLN 1.0000 unit
II. Konstruksi Pemasangan
Penggelaran kabel 80.0000 meter
Gali dan Tutup Tanah Keras 2.0000 m3
Pengecoran Tiang Over Head 1.0000 Unit
Pengecoran Patok Pengaman 3.0000 Unit
Pasang dan Stel Box Lampu 1.0000 Unit
Pembuatan dudukan Box Control 1.0000 Buah
Nilai HSPK :
Nilai HSPK :
24.11.01.05 Pengadaan Traffic Light Tiang Lurus Buah
I. Pengadaan
20.03.06.19.38 Kontroller TLC x1 comp 4 1.0000 Unit
20.03.06.19.10 Box Lampu 3 Aspek LED 30 Cm 10.0000 Unit
20.03.06.19.09 Box Lampu 2 Aspek LED 20 Cm 8.0000 Unit
20.03.06.18.01 Tiang Over Head 6.5.3" 3.0000 Batang
20.03.06.18.02 Tiang Lurus 5", tinggi 2 m 3.0000 Batang
20.03.06.19.01 Armatur Box Lampu 36.0000 Buah
20.03.06.19.52 Patok Pengaman 4" BSB 24.0000 Buah
20.03.06.19.64 Terminal Kabel 10.0000 Buah
20.03.06.01.04.50 Kabel NYY 4 x 2.5 mm 420.00 m
20.03.06.01.04.23 Kabel NYY 2 x 4 mm 40.0000 m
20.03.06.19.103 Pipa BSB 1" 2.0000 Batang
20.01.01.05.06 Pasir Urug 3.0000 m3
20.03.06.19.56 Rambu Tabel 1 plus Pengaman 4.0000 set
20.03.06.19. Biaya Penyambungan PLN 1.0000 Unit
II. Konstruksi Pemasangan
Penggelaran Kabel 460.00 m
Pemasangan Pipa PVC 200.00 m
Boring Bawah Aspal 68.0000 m3
Gali dan Tutup Tanah Keras 70.0000 m3
Pengecoran Tiang Over Head 3.0000 Buah
Pemerintah Kabupaten Madiun
- 105 -
Peralatan:
21.02.01.02.02 Sewa Alat Bantu 0.0850 Unit
Pengangkutan Rambu ke Lokasi 1.0000 Unit
Nilai HSPK:
WAKIL BUPA
Drs. ISWAN
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 2,200.00
Rp 90,000.00 Rp 3,960.00
Rp 65,000.00 Rp 5,785.00
Rp - Rp -
Rp 77,000.00 Rp 3,388.00
Rp - Rp -
Rp 98,400.00 Rp 4,329.60
Rp 251,750.00 Rp 11,077.00
Nilai HSPK : Rp 30,739.60
Rp 100,000.00 Rp 2,200.00
Rp 90,000.00 Rp 3,960.00
Rp 65,000.00 Rp 5,785.00
Rp - Rp -
Rp 98,400.00 Rp 4,329.60
Nilai HSPK : Rp 16,274.60
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 8,500.00 Rp 255,000.00
Rp 16,000.00 Rp 800,000.00
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 100.00 Rp 8,000.00
Rp 40,000.00 Rp 80,000.00
Rp 100,000.00 Rp 100,000.00
Rp 60,000.00 Rp 180,000.00
Rp 15,000.00 Rp 15,000.00
Rp 140,000.00 Rp 140,000.00
HARGA
HARGA
SATUAN
Rp 26,850.00 Rp 26,850.00
HARGA
HARGA
SATUAN
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 8,500.00 Rp 255,000.00
Rp 16,000.00 Rp 800,000.00
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 100.00 Rp 8,000.00
Rp 40,000.00 Rp 80,000.00
Rp 100,000.00 Rp 100,000.00
Rp 60,000.00 Rp 180,000.00
Rp 15,000.00 Rp 15,000.00
Rp 140,000.00 Rp 140,000.00
Rp 26,850.00 Rp 26,850.00
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 23,000.00 Rp 9,660,000.00
Rp 21,000.00 Rp 840,000.00
Rp - Rp -
Rp 134,250.00 Rp 402,750.00
Rp - Rp -
Rp - Rp -
Rp 100.00 Rp 46,000.00
Rp 1,000.00 Rp 200,000.00
Rp 32,500.00 Rp 2,210,000.00
Rp 40,000.00 Rp 2,800,000.00
Rp 100,000.00 Rp 300,000.00
Pemerintah Kabupaten Madiun
- 114 -
HARGA
HARGA
SATUAN
Rp 80,000.00 Rp 240,000.00
Rp 60,000.00 Rp 1,440,000.00
Rp 15,000.00 Rp 270,000.00
Rp 140,000.00 Rp 140,000.00
Rp 165,000.00 Rp 165,000.00
Rp 26,850.00 Rp 26,850.00
Rp 30,739.60 Rp 2,028,813.60
Rp - Rp -
Nilai HSPK : Rp 20,769,413.60
HARGA
HARGA
SATUAN
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 23,000.00 Rp 9,660,000.00
Rp 21,000.00 Rp 840,000.00
Rp - Rp -
Rp 134,250.00 Rp 402,750.00
Rp - Rp -
Rp - Rp -
Rp 100.00 Rp 46,000.00
Rp 1,000.00 Rp 200,000.00
Rp 32,500.00 Rp 2,210,000.00
Rp 40,000.00 Rp 2,800,000.00
Rp 100,000.00 Rp 300,000.00
Rp 80,000.00 Rp 240,000.00
Rp 60,000.00 Rp 1,440,000.00
Rp 15,000.00 Rp 270,000.00
Rp 140,000.00 Rp 140,000.00
Rp 165,000.00 Rp 165,000.00
Rp 26,850.00 Rp 26,850.00
Rp 30,739.60 Rp 2,028,813.60
Rp - Rp -
Nilai HSPK : Rp 20,769,413.60
Rp 100,000.00 Rp 50,000.00
Rp 65,000.00 Rp 227,500.00
Rp 584,700.00 Rp 28,357.95
Rp - Rp -
Rp - Rp -
Rp 25,091.67 Rp 75,275.00
Rp 12,750.00 Rp 9,562.50
Rp 12,750.00 Rp 3,187.50
Err:509 Err:509
HARGA
HARGA
SATUAN
Rp 98,400.00 Rp 8,364.00
Rp 12,000.00 Rp 12,000.00
Nilai HSPK: Err:509
HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 50,000.00
Rp 65,000.00 Rp 227,500.00
Rp 584,700.00 Rp 125,710.50
Rp - Rp -
Rp - Rp -
Rp 793,500.00 Rp 2,380,500.00
Rp 12,750.00 Rp 6,375.00
Rp 12,750.00 Rp 3,825.00
Err:509 Err:509
Rp 98,400.00 Rp 7,380.00
Rp 12,000.00 Rp 12,000.00
Nilai HSPK: Err:509
Rp 13,000.00 Rp 13,000.00
Rp 10,500.00 Rp 480,375.00
Rp 19,550.00 Rp 58,650.00
Rp - Rp -
Rp - Rp -
Err:509 Err:509
Rp 18,100.00 Rp 40,725.00
Rp - Rp -
Rp 53,415.00 Rp 89,737.20
Rp 182,980.00 Rp 36,596.00
Rp 217,738.00 Rp 1,273,767.30
Rp 851,801.93 Rp 519,599.18
Rp 100,000.00 Rp 100,000.00
Nilai HSPK : Err:509
Rp 73,900.00 Rp 73,900.00
Rp - Rp -
Rp - Rp -
Rp 50,000.00 Rp 50,000.00
Rp 100,000.00 Rp 200.00
Nilai HSPK : Rp 124,100.00
HARGA
HARGA
SATUAN
Rp 73,900.00 Rp 73,900.00
Rp - Rp -
Rp - Rp -
Rp 50,000.00 Rp 50,000.00
Rp 100,000.00 Rp 1,500.00
Nilai HSPK : Rp 125,400.00
HARGA
HARGA
SATUAN
Rp 13,000.00 Rp 1,045,200.00
Rp 66,125.00 Rp 7,736,625.00
Rp 12,750.00 Rp 76,500.00
Rp 10,500.00 Rp 226,464.00
Rp 16,783.33 Rp 1,090,916.67
Rp 12,750.00 Rp 3,060.00
Rp 12,750.00 Rp 89,250.00
Rp 67,150.00 Rp 201,450.00
Rp 869.65 Rp 261,075.89
Rp 100,000.00 Rp 2,500.00
Rp 90,000.00 Rp 2,250.00
Rp 65,000.00 Rp 16,250.00
Rp 25,091.67 Rp 68,500.25
Rp 674,000.00 Rp 1,702,524.00
Rp 13,100.00 Rp 13,755.00
Rp 1,518,350.00 Rp 379,587.50
Rp 98,400.00 Rp 4,920.00
Nilai HSPK : Rp 2,190,286.75
TAHUN 2008
KODE
NO NAMA BARANG MERK / UKURAN SATUAN
BARANG
1 2 3 4 5
20 BARANG PERSEDIAAN DAN BARANG PAKAI HABIS
20.01 BARANG PAKAI HABIS
20.01.01 BAHAN BANGUNAN DAN KONSTRUKSI
20.01.01.01. Aspal
4 20.01.01.01.04 Aspal Aspal Curah Kg
5 20.01.01.01.05 Aspal Aspal Bitumen Kg
20.01.01.02. Semen
3 20.01.01.02.03 Semen Gresik 40 Kg zak
4 20.01.01.02.04 Semen Gresik 50 Kg zak
20.01.01.08. Baja
1 20.01.01.08.01 Baja Plat Siku Kg
2 20.01.01.08.02 Baja Baja WF/ Profil/ INP/ H.Beam Kg
3 20.01.01.08.03 Baja Plat Strip Kg
20.01.01.12. Besi
16 20.01.01.12.16 Besi Beton, polos Kg
17 20.01.01.12.17 Besi Beton, Ulir Kg
20.01.05. BAHAN BAKU
20.01.05.01. Kawat
2 20.01.05.01.02 Kawat Kawat Berduri m'
3 20.01.05.01.03 Kawat Kawat Beton Kg
20.01.05.02 Kayu
1 20.01.05.02.01 Kayu Bengkirai Balok m3
2 20.01.05.02.02 Kayu Bengkirai Papan m3
3 20.01.05.02.03 Kayu Bengkirai Usuk m3
16 20.01.05.02.16 Kayu Kamper Balok 6 x 12 x 400cm m3
17 20.01.05.02.17 Kayu Kamper Kaso 5 x 7 x 400cm m3
18 20.01.05.02.18 Kayu Kamper Papan 2 x 20 x 400cm m3
19 20.01.05.02.19 Kayu Kamper Reng 2 x 3 x 400cm m3
20 20.01.05.02.20 Kayu Kruing Balok 6 x 12 x 400cm m3
21 20.01.05.02.21 Kayu Kruing Kaso 5 x 7 x 400cm m3
22 20.01.05.02.22 Kayu Kruing Papan 2 x 20 x 400cm m3
23 20.01.05.02.23 Kayu Kruing Reng 2 x 3 x 400cm m3
24 20.01.05.02.24 Kayu Meranti Balok 6 x 12 x 400Cm m3
25 20.01.05.02.25 Kayu Meranti Kaso 5 x 7 x 400Cm m3
26 20.01.05.02.26 Kayu Meranti Papan 2 x 20 x 400Cm m3
27 20.01.05.02.27 Kayu Meranti Reng 2 x 3 x 400Cm m3
20.05.06 PIPA PVC/UPVC
20.05.06.01 Pipa PVC
85 20.05.06.01.85 Pipa PVC Dia 2" S-12,5 @ 6m Batang
20.05.06.02 Pipa Galvanis (Air Tuang)
1 20.05.06.02.01 Pipa Galvanis dia 1/2" @ 6m Batang
120
KODE
NO NAMA BARANG MERK / UKURAN SATUAN
BARANG
2 20.05.06.02.02 Pipa Galvanis dia 3/4" @ 6m Batang
3 20.05.06.02.03 Pipa Galvanis dia 1" @ 6m Batang
4 20.05.06.02.04 Pipa Galvanis dia 1 1/2" @ 6m Batang
5 20.05.06.02.05 Pipa Galvanis dia 2" @ 6m Batang
6 20.05.06.02.06 Pipa Galvanis dia 2 1/2" @ 6m Batang
7 20.05.06.02.07 Pipa Galvanis dia 3" @ 6m Batang
8 20.05.06.02.08 Pipa Galvanis dia 4" @ 6m Batang
9 20.05.06.02.09 Pipa Galvanis dia 6" @ 6m Batang
10 20.05.06.02.10 Pipa Galvanis dia 8" @ 6m Batang
20.01.04. BAHAN BAKAR DAN PELUMAS
20.01.04.01. Bahan Bakar Minyak
1 20.01.04.01.01 Bensin / Premium ltr
2 20.01.04.01.02 Solar ltr
Pompa Turbin & Submersible
121
KONSTRUKSI
HARGA
SATUAN
6
7,700
8,100
48,300
59,000
14,750
15,900
15,200
12,900
13,200
3,500
12,700
6,254,000
6,077,000
5,723,000
6,555,500
5,900,000
6,268,750
5,654,100
6,145,800
5,689,200
6,047,500
5,408,300
4,302,000
3,540,000
4,056,250
3,441,600
115,700
165,200
122
HARGA
SATUAN
247,800
324,500
385,800
678,500
890,900
1,091,500
1,476,100
2,100,400
2,478,000
6,000
5,500
133,731,000
118,440,000
137,820,000
126,000,000
157,800,000
123
DAFTAR ANALISA STANDAR BELANJA
PEMBANGUNAN DAN REHABILITASI BANGUNA
DAN PENDOPO
26.08.01 Pembangunan Gedung
II PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.174688525 M³
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.196721311 Ttk
25.01.02.13 Urugan tanah kembali 0.043672131 M³
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.03042623 M³
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.050819672 M³
IV PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.6859 M²
25.04.01.30 Pek. Plesteran halus 5.3718 M²
25.04.01.38 Pek. benangan 1.9148 M¹
25.02.01.12 Pek. pondasi batu kali 0.0813 M³
25.02.01.20 Pas. aanstamping t = 20 cm 0.0494 M³
V PEK. LANTAI
25.05.01.11 Pas. Lantai marmer 0.9820 M²
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.1364 M²
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.0344 M²
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.1646 M²
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.0689 M¹
VI PEK. DAUN PINTU,JENDELA DAN KUSEN
25.07.01.04 Pas. daun pintu teakwood rangka ky. kamper 0.0771 M²
25.07.01.04 Pas. daun pintu kaca rangka ky. kamper 0.0204 M²
25.07.01.47 Pas. kaca mati tb = 5 mm 0.1034 M²
25.07.01.11 Pas. jendela diatas daun pintu/jendela 0.0585 M²
dan bouvenlist ( kaca selipan )
25.07.01.02 Pas. kusen ky kamper 0.0150 M³
IX PEK. PENGECATAN
25.04.02.18 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.0309 M²
25.04.02.22 Pek. pengecatan dinding 5.3718 M²
25.04.02.21 Pek. pengecatan plafond 1.5984 M²
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.1950 M²
25.04.02.16 Pek. koltir rangka atap 1.6458 M²
25.04.02.12 Pek. meni rangka plafond 1.5984 M²
X PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.0721 Unit
25.07.01.22 Pas. engsel kuningan untuk pintu 0.1082 Stel
25.07.01.21 Pas. engsel kuningan untuk jendela 0.0787 Stel
25.07.01.32 Pas. hak angin lurus 0.0393 Bh
25.07.01.24 Pas. grendel kecil biasa 0.1508 Bh
II PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.1747 M³
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.1967 Ttk
25.01.02.13 Urugan tanah kembali 0.0437 M³
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.0304 M³
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.0508 M³
IV PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.6859 M²
25.04.01.30 Pek. Plesteran halus 5.3718 M²
25.04.01.38 Pek. benangan 1.9148 M¹
25.02.01.12 Pek. pondasi batu kali 0.0813 M³
25.02.01.20 Pas. aanstamping t = 20 cm 0.0494 M³
V PEK. LANTAI
25.05.01.04 Pas. keramik lantai 30 x 30 cm ( Motif ) 0.9820 M²
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.1364 M²
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.0344 M²
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.1646 M²
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.0689 M¹
IX PEK. PENGECATAN
25.04.02.21 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.0309 M²
25.04.02.10 Pek. pengecatan dinding 5.3718 M²
25.04.02.21 Pek. pengecatan plafond 1.5984 M²
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.1950 M²
25.04.02.16 Pek. koltir rangka atap 1.6458 M²
25.04.02.12 Pek. meni rangka plafond 1.5984 M²
X PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.0721 Unit
25.07.01.22 Pas. engsel kuningan untuk pintu 0.1082 Stel
25.07.01.21 Pas. engsel kuningan untuk jendela 0.0787 Stel
25.07.01.32 Pas. hak angin lurus 0.0393 Bh
25.07.01.24 Pas. grendel kecil biasa 0.1508 Bh
II PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.174688525 M³
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.196721311 Ttk
25.01.02.13 Urugan tanah kembali 0.043672131 M³
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.03042623 M³
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.050819672 M³
IV PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.685901639 M²
25.04.01.30 Pek. Plesteran halus 5.371803279 M²
25.04.01.38 Pek. benangan 1.914754098 M¹
25.02.01.12 Pek. pondasi batu kali 0.081295082 M³
25.02.01.20 Pas. aanstamping t = 20 cm 0.049442623 M³
V PEK. LANTAI
25.05.01.03 Pas. keramik lantai 30 x 30 cm ( Motif ) 0.981967213 M²
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.136393443 M²
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.03442623 M²
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.164590164 M²
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.068852459 M¹
VI PEK. DAUN PINTU,JENDELA DAN KUSEN
25.07.01.05 Pas. daun pintu triplek rangka ky. kamper 0.077114754 M²
25.07.01.05 Pas. daun pintu kaca rangka ky. kamper 0.020380328 M²
25.07.01.13 Pas. kaca mati tb = 5 mm 0.103403279 M²
25.07.01.11 Pas. jendela diatas daun pintu/jendela 0.058478689 M²
dan bouvenlist ( kaca selipan ) 0
25.07.01.02 Pas. kusen ky kamper 0.015016131 M³
IX PEK. PENGECATAN
25.04.02.21 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.030870033 M²
25.04.02.10 Pek. pengecatan dinding 5.371803279 M²
25.04.02.21 Pek. pengecatan plafond 1.598360656 M²
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.194990164 M²
25.04.02.16 Pek. koltir rangka atap 1.645803279 M²
25.04.02.12 Pek. meni rangka plafond 1.598360656 M²
X PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.072131148 Unit
25.07.01.22 Pas. engsel kuningan untuk pintu 0.108196721 Stel
25.07.01.21 Pas. engsel kuningan untuk jendela 0.078688525 Stel
25.07.01.32 Pas. hak angin lurus 0.039344262 Bh
25.07.01.24 Pas. grendel kecil biasa 0.150819672 Bh
II PEK. TANAH
25.02.01.24 Pembuatan Lubang Strous Pile diameter 30 cm 0.04 Ttk
25.01.02.07 Galian Tanah 0.468 M³
25.01.02.13 Urugan Tanah Kembali 0.22596 M³
25.01.02.16 Pengurugan Pasir (PADAT) 0.1542 M³
25.01.02.17 Pengurugan Sirtu (PADAT) 0.3987 M³
IV PEK. LANTAI
25.05.01.06 Pas. keramik lantai 40 x 40 cm ( Motif ) 1.4336 M²
IV PEK. PEMBESIAN
25.03.02.05 Pekerjaan Besi WF 150x100x7x10 6.9802425 Kg
25.03.02.03 Pekerjaan Besi Plat Tebal 2 mm 1.1740032 Kg
B.20.01.01.44.06 Baut 22 mm 3.6 Bh
B.20.01.01.62.02 Angker 0.8 Bh
PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.1747 M³
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.1967 Ttk
25.01.02.13 Urugan tanah kembali 0.0437 M³
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.0304 M³
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.0508 M³
PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.6859 M²
25.04.01.30 Pek. Plesteran halus 5.3718 M²
25.04.01.38 Pek. benangan 1.9148 M¹
25.02.01.12 Pek. pondasi batu kali 0.0813 M³
25.02.01.20 Pas. aanstamping t = 20 cm 0.0494 M³
PEK. LANTAI
25.05.01.11 Pas. Lantai marmer 0.9820 M²
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.1364 M²
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.0344 M²
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.1646 M²
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.0689 M¹
PEK. ATAP
25.06.02.03 Pas. genteng Kr. pilang/wisma 1.6458 M²
25.06.01.01 Pas. kuda - kuda Ky. kamper 8/12 0.0128 M³
25.06.01.07 Pas. pengapit kuda - kuda + jurai 6/12 0.0075 M³
25.06.01.07 Pas. gording kamper 8/12 0.0132 M²
25.06.01.06 Pas. reng jati Usuk ky. Kamper 1.6458 M³
25.06.02.12 Pas. bumbungan kr pilang/wisma 0.2426 M¹
25.06.02.32 Pas Listplank Kayu Jati 3 / 30 cm 0.4508 M¹
25.06.02.18 Pek. talang jurai 0.0656 M¹
PEK. PLAFOND
25.06.03.17 Pas. Plafond Kalsiboard Rangka Aluminium 1.5984 M²
25.06.03.06 Pas. list plafond 1.6295 M¹
PEK. PENGECATAN
25.04.02.18 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.0309 M²
25.04.02.22 Pek. pengecatan dinding 5.3718 M²
25.04.02.21 Pek. pengecatan plafond 1.5984 M²
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.1950 M²
25.04.02.16 Pek. koltir rangka atap 1.6458 M²
25.04.02.12 Pek. meni rangka plafond 1.5984 M²
PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.0721 Unit
25.07.01.22 Pas. engsel kuningan untuk pintu 0.1082 Stel
25.07.01.21 Pas. engsel kuningan untuk jendela 0.0787 Stel
25.07.01.32 Pas. hak angin lurus 0.0393 Bh
25.07.01.24 Pas. grendel kecil biasa 0.1508 Bh
PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.1747 M³
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.1967 Ttk
25.01.02.13 Urugan tanah kembali 0.0437 M³
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.0304 M³
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.0508 M³
PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.6859 M²
25.04.01.30 Pek. Plesteran halus 5.3718 M²
25.04.01.38 Pek. benangan 1.9148 M¹
25.02.01.12 Pek. pondasi batu kali 0.0813 M³
25.02.01.20 Pas. aanstamping t = 20 cm 0.0494 M³
26.08.04.04 Rehabilitasi Lantai Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls
PEK. LANTAI
25.05.01.04 Pas. keramik lantai 30 x 30 cm ( Motif ) 0.9820 M²
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.1364 M²
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.0344 M²
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.1646 M²
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.0689 M¹
PEK. ATAP
25.06.02.03 Pas. genteng Kr. pilang/wisma 1.6458 M²
25.06.01.02 Pas. kuda - kuda Ky. kamper 8/12 0.0128 M³
25.06.01.07 Pas. pengapit kuda - kuda + jurai 6/12 0.0075 M³
25.06.01.07 Pas. gording kamper 8/12 0.0132 M²
25.06.01.04 Pas. reng kamper Usuk ky. kamper 1.6458 M³
25.06.02.12 Pas. bumbungan kr pilang/wisma 0.2426 M¹
25.06.02.33 Pas. listplank ky papan 3 x 30 cm 0.4508 M¹
25.06.02.18 Pek. talang jurai 0.0656 M¹
PEK. PLAFOND
25.06.03.07 Pas. plafond eternit rangka ky kamper 1.5984 M²
25.06.03.06 Pas. list plafond 1.6295 M¹
PEK. PENGECATAN
25.04.02.21 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.0309 M²
25.04.02.10 Pek. pengecatan dinding 5.3718 M²
25.04.02.21 Pek. pengecatan plafond 1.5984 M²
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.1950 M²
25.04.02.16 Pek. koltir rangka atap 1.6458 M²
25.04.02.12 Pek. meni rangka plafond 1.5984 M²
PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.0721 Unit
25.07.01.22 Pas. engsel kuningan untuk pintu 0.1082 Stel
25.07.01.21 Pas. engsel kuningan untuk jendela 0.0787 Stel
25.07.01.32 Pas. hak angin lurus 0.0393 Bh
25.07.01.24 Pas. grendel kecil biasa 0.1508 Bh
26.08.04.10 Rehabilitasi Instalasi Listrik Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls
PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.1747 M³
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.1967 Ttk
25.01.02.13 Urugan tanah kembali 0.0437 M³
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.0304 M³
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.0508 M³
26.08.05.02 Rehabilitasi Struktur Beton Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls
PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.6859 M²
25.04.01.30 Pek. Plesteran halus 5.3718 M²
25.04.01.38 Pek. benangan 1.9148 M¹
25.02.01.12 Pek. pondasi batu kali 0.0813 M³
25.02.01.20 Pas. aanstamping t = 20 cm 0.0494 M³
PEK. LANTAI
25.05.01.03 Pas. keramik lantai 30 x 30 cm ( Motif ) 0.9820 M²
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.1364 M²
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.0344 M²
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.1646 M²
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.0689 M¹
PEK. ATAP
25.06.02.01 Pas. genteng jawa 1.6458 M²
25.06.01.02 Pas. kuda - kuda Ky. meranti 8/12 0.0128 M³
25.06.01.07 Pas. pengapit kuda - kuda + jurai 6/12 0.0075 M³
25.06.01.07 Pas. gording kamper 8/12 0.0132 M²
25.06.01.05 Pas. reng kamper Usuk ky. kamper 1.6458 M³
25.06.02.11 Pas. Wuwungan genteng jawa 0.2426 M¹
25.06.02.33 Pas. listplank ky papan 3 x 30 cm 0.4508 M¹
25.06.02.18 Pek. talang jurai 0.0656 M¹
PEK. PLAFOND
25.06.03.04 Pas. plafond eternit rangka ky kamper 1.5984 M²
25.06.03.06 Pas. list plafond 1.6295 M¹
26.08.05.08 Rehabilitasi Pengecatan Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls
PEK. PENGECATAN
25.04.02.21 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.0309 M²
25.04.02.10 Pek. pengecatan dinding 5.3718 M²
25.04.02.21 Pek. pengecatan plafond 1.5984 M²
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.1950 M²
25.04.02.16 Pek. koltir rangka atap 1.6458 M²
25.04.02.12 Pek. meni rangka plafond 1.5984 M²
PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.0721 Unit
25.07.01.22 Pas. engsel kuningan untuk pintu 0.1082 Stel
25.07.01.21 Pas. engsel kuningan untuk jendela 0.0787 Stel
25.07.01.32 Pas. hak angin lurus 0.0393 Bh
25.07.01.24 Pas. grendel kecil biasa 0.1508 Bh
PEK. TANAH
25.02.01.24 Pembuatan Lubang Strous Pile diameter 30 cm 0.0400 Ttk
25.01.02.07 Galian Tanah 0.4680 M³
25.01.02.13 Urugan Tanah Kembali 0.2260 M³
25.01.02.16 Pengurugan Pasir (PADAT) 0.1542 M³
25.01.02.17 Pengurugan Sirtu (PADAT) 0.3987 M³
PEK. PASANGAN
25.02.01.11 Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 3 Ps) 0.2150 M³
25.04.01.30 Plesteran Halus 1 Pc : 4 Ps tebal 1,5 cm 1.1365 M³
25.04.01.38 Pasang Benangan 2.9800 M
PEK. LANTAI
25.05.01.06 Pas. keramik lantai 40 x 40 cm ( Motif ) 1.4336 M²
HARGA
JUMLAH (Rp)
SATUAN (Rp)
500,000.00 3,278.69
35,520.14 16,420.79
JUMLAH 19,699.47
20,250.00 3,537.44
45,600.00 8,970.49
5,062.50 221.09
117,741.25 3,582.42
117,741.25 5,983.57
JUMLAH 22,295.02
3,457,113.56 153,019.78
1,880,541.98 42,295.55
1,880,541.98 7,102.90
2,777,913.59 73,774.10
419,259.66 27,525.43
2,777,913.59 10,656.26
2,777,913.59 87,435.97
2,777,913.59 115,930.73
419,259.66 4,845.54
2,777,913.59 20,401.73
JUMLAH 542,987.98
50,100.92 134,566.15
18,901.15 101,533.26
5,865.60 11,231.18
427,332.94 34,740.07
179,720.00 8,885.83
JUMLAH 290,956.48
449,184.00 441,083.96
106,978.74 14,591.20
76,305.40 2,626.91
106,978.74 124,586.39
22,569.25 1,553.95
JUMLAH 584,442.40
284,491.72 21,938.51
284,491.72 5,798.03
307,273.40 31,773.08
332,624.50 19,451.44
6,617,060.00 99,362.64
JUMLAH 178,323.71
65,130.00 107,191.17
12,914,000.00 165,841.16
62,276.80 469.27
62,276.80 824.26
104,435.80 171,880.78
49,958.25 12,121.02
152,017.90 68,532.66
118,263.44 7,754.98
JUMLAH 534,615.30
122,735.00 196,174.80
4,683.00 7,630.99
JUMLAH 203,805.78
88,190.90 90,913.36
19,986.00 107,360.86
21,821.40 34,878.47
39,277.80 7,658.78
6,287.50 10,347.99
5,287.20 8,450.85
JUMLAH 259,610.31
97,650.00 7,043.61
42,800.00 4,630.82
34,700.00 2,730.49
26,200.00 1,030.82
9,600.00 1,447.87
JUMLAH 16,883.61
195,150.00 24,313.77
51,700.00 5,424.26
7,450.00 146.56
227,500.00 1,491.80
29,205.30 2,298.12
26,755.30 2,105.34
29,205.30 383.02
JUMLAH 36,162.87
20,250.00 824.89
117,741.25 159.87
50,100.92 5,660.11
1,784,684.36 5,815.98
18,901.15 2,135.34
135,517.96 1,332.96
Jumlah 15,929.17
20,250.00 473.25
13,753.60 356.24
76,305.40 4,723.43
117,741.25 203.83
418,649.94 362.37
2,777,913.59 17,195.74
Jumlah 23,314.86
459,150.00 18,064.92
450,000.00 2,950.82
58,250.00 3,055.74
69,000.00 22,622.95
77,937.50 12,776.64
281,900.00 3,697.05
19,060.00 249.97
19,060.00 249.97
185,120.00 2,427.80
JUMLAH 66,095.85
300000 1,967.21
500,000.00 3,278.69
JUMLAH 5,245.90
Nilai ASB 2,800,368.71
500,000.00 3,278.69
35,520.14 16,420.79
JUMLAH 19,699.47
20,250.00 3,537.44
45,600.00 8,970.49
5,062.50 221.09
117,741.25 3,582.42
117,741.25 5,983.57
JUMLAH 22,295.02
3,457,113.56 153,019.78
1,880,541.98 42,295.55
1,880,541.98 7,102.90
2,777,913.59 73,774.10
419,259.66 27,525.43
2,777,913.59 10,656.26
2,777,913.59 87,435.97
2,777,913.59 115,930.73
419,259.66 4,845.54
2,777,913.59 20,401.73
JUMLAH 542,987.98
50,100.92 134,566.15
18,901.15 101,533.26
5,865.60 11,231.18
427,332.94 34,740.07
179,720.00 8,885.83
JUMLAH 290,956.48
69,654.00 68,397.94
106,978.74 14,591.20
76,305.40 2,626.91
106,978.74 124,586.39
22,569.25 1,553.95
JUMLAH 211,756.39
284,491.72 21,938.51
284,491.72 5,798.03
55,973.40 5,787.83
332,624.50 19,451.44
6,617,060.00 99,362.64
JUMLAH 152,338.46
65,130.00 107,191.17
5,273,760.00 67,725.45
62,276.80 469.27
62,276.80 824.26
81,248.35 133,718.80
49,958.25 12,121.02
69,049.16 31,128.72
118,263.44 7,754.98
JUMLAH 360,933.67
113,412.72 181,274.43
4,683.00 7,630.99
JUMLAH 188,905.42
21,821.40 22,495.03
11,820.00 63,494.71
21,821.40 34,878.47
39,277.80 7,658.78
6,287.50 10,347.99
5,287.20 8,450.85
JUMLAH 147,325.83
97,650.00 7,043.61
42,800.00 4,630.82
34,700.00 2,730.49
26,200.00 1,030.82
9,600.00 1,447.87
JUMLAH 16,883.61
195,150.00 24,313.77
51,700.00 5,424.26
7,450.00 146.56
227,500.00 1,491.80
29,205.30 2,298.12
26,755.30 2,105.34
29,205.30 383.02
JUMLAH 36,162.87
20,250.00 824.89
117,741.25 159.87
50,100.92 5,660.11
1,784,684.36 5,815.98
18,901.15 2,135.34
135,517.96 1,332.96
Jumlah 15,929.17
20,250.00 473.25
13,753.60 356.24
76,305.40 4,723.43
117,741.25 203.83
418,649.94 362.37
2,777,913.59 17,195.74
Jumlah 23,314.86
459,150.00 18,064.92
450,000.00 2,950.82
58,250.00 3,055.74
69,000.00 22,622.95
77,937.50 12,776.64
281,900.00 3,697.05
19,060.00 249.97
19060 249.97
185120 2,427.80
JUMLAH 66,095.85
300000 1,967.21
500000 3,278.69
JUMLAH 5,245.90
Nilai ASB 2,100,830.98
500000 3,278.69
35520.14 16,420.79
JUMLAH 19,699.47
20250 3,537.44
3600 708.20
45600 1,991.45
117741.25 3,582.42
117741.25 5,983.57
JUMLAH 15,803.08
3457113.56 153,019.78
1880541.98025 42,295.55
1880541.98025 7,102.90
2777913.591 73,774.10
419259.66 27,525.43
2777913.591 10,656.26
2777913.591 87,435.97
2777913.591 115,930.73
419259.66 4,845.54
2777913.591 20,401.73
JUMLAH 542,987.98
50100.9219009219 134,566.15
18901.15 101,533.26
5865.6 11,231.18
427332.94 34,740.07
179720 8,885.83
JUMLAH 290,956.48
67924 66,699.14
106978.74 14,591.20
76305.4 2,626.91
106978.74 124,586.39
22569.245625 1,553.95
JUMLAH 210,057.58
281731.72 21,725.67
281731.72 5,741.78
55973.4 5,787.83
332624.5 19,451.44
4635300 69,604.27
JUMLAH 122,311.01
22630 37,244.53
4768720 61,239.75
62276.8 469.27
62276.8 824.26
70547.71 116,107.65
42312.9 10,266.08
69049.16 31,128.72
118263.44 7,754.98
JUMLAH 265,035.23
77374.84 123,672.90
4683 7,630.99
JUMLAH 131,303.89
21821.4 22,495.03
11820 63,494.71
21821.4 34,878.47
39277.8 7,658.78
6287.5 10,347.99
5287.2 8,450.85
JUMLAH 147,325.83
97650 7,043.61
42800 4,630.82
34700 2,730.49
26200 1,030.82
9600 1,447.87
JUMLAH 16,883.61
94500 11,773.77
1650 173.11
7800 153.44
227,500.00 1,491.80
29,205.30 2,298.12
26,755.30 2,105.34
29,205.30 383.02
JUMLAH 18,378.61
20250 824.89
117741.25 159.87
50100.9219009219 5,660.11
1784684.36 5,815.98
18901.15 2,135.34
135517.96296 1,332.96
Jumlah 15,929.17
0.00
208732.5 4,878.18
13753.6 356.24
76305.4 4,723.43
117741.25 203.83
418649.94 362.37
2777913.591 17,195.74
Jumlah 27,719.79
459150 18,064.92
450000 2,950.82
58250 3,055.74
69000 22,622.95
77937.5 12,776.64
281900 3,697.05
19060 249.97
19060 249.97
185120 2,427.80
JUMLAH 66,095.85
300000 1,967.21
500000 3,278.69
JUMLAH 5,245.90
Nilai ASB 1,889,455.21
HARGA
JUMLAH (Rp)
SATUAN (Rp)
350000 3,500.00
43115.8 3,449.26
Jumlah 6,949.26
43115.8 1,724.63
20250 9,477.00
5062.5 1,143.92
106956.25 16,492.65
87501.25 34,886.75
Jumlah 63,724.96
406973.71338 87,515.63
5000 5,682.50
5680.8 16,928.78
Jumlah 110,126.91
404051.645 30,410.54
18606.5 753.56
3241888.403 439,081.37
2907758.003 32,899.20
Jumlah 503,144.68
80364 115,209.83
Jumlah 115,209.83
13093.6 91,396.50
13753.6 16,146.77
3000 10,800.00
2200 1,760.00
Jumlah 118,343.27
58904.52 124,583.06
64380 136,163.70
49958.25 21,482.05
46133.18 22,974.32
62276.8 1,771.81
67775.76 145,175.68
2988.25 8,606.16
Jumlah 460,756.78
5287.2 13,186.70
6287.5 13,298.06
21821.4 7,682.88
21821.4 46,741.44
11820 13,433.43
Jumlah 94,342.51
195150 9,757.50
51700 2,068.00
1500000 15,000.00
29205.3 584.11
29205.3 584.11
Jumlah 27,993.71
300000 3,000.00
350000 3,500.00
Jumlah 6,500.00
Nilai ASB 1,507,091.91
HARGA
JUMLAH (Rp)
SATUAN (Rp)
500,000.00 3,278.69
JUMLAH 3,278.69
20,250.00 3,537.44
45,600.00 8,970.49
5,062.50 221.09
117,741.25 3,582.42
117,741.25 5,983.57
JUMLAH 22,295.02
Nilai ASB 25,573.71
500,000.00 3,278.69
JUMLAH 3,278.69
3,457,113.56 153,019.78
1,880,541.98 42,295.55
1,880,541.98 7,102.90
2,777,913.59 73,774.10
419,259.66 27,525.43
2,777,913.59 10,656.26
2,777,913.59 87,435.97
2,777,913.59 115,930.73
419,259.66 4,845.54
2,777,913.59 20,401.73
JUMLAH 542,987.98
Nilai ASB 546,266.66
500,000.00 3,278.69
JUMLAH 3,278.69
50,100.92 134,566.15
18,901.15 101,533.26
5,865.60 11,231.18
427,332.94 34,740.07
179,720.00 8,885.83
JUMLAH 290,956.48
Nilai ASB 294,235.17
500,000.00 3,278.69
JUMLAH 3,278.69
449,184.00 441,083.96
106,978.74 14,591.20
76,305.40 2,626.91
106,978.74 124,586.39
22,569.25 1,553.95
JUMLAH 584,442.40
Nilai ASB 587,721.09
500,000.00 3,278.69
JUMLAH 3,278.69
284,491.72 21,938.51
284,491.72 5,798.03
307,273.40 31,773.08
332,624.50 19,451.44
6,617,060.00 99,362.64
JUMLAH 178,323.71
Nilai ASB 181,602.39
500,000.00 3,278.69
JUMLAH 3,278.69
65,130.00 107,191.17
12,914,000.00 165,841.16
62,276.80 469.27
62,276.80 824.26
104,435.80 171,880.78
49,958.25 12,121.02
152,017.90 68,532.66
118,263.44 7,754.98
JUMLAH 534,615.30
Nilai ASB 537,893.99
500,000.00 3,278.69
JUMLAH 3,278.69
122,735.00 196,174.80
4,683.00 7,630.99
JUMLAH 203,805.78
Nilai ASB 207,084.47
500,000.00 3,278.69
JUMLAH 3,278.69
88,190.90 90,913.36
19,986.00 107,360.86
21,821.40 34,878.47
39,277.80 7,658.78
6,287.50 10,347.99
5,287.20 8,450.85
JUMLAH 259,610.31
Nilai ASB 262,889.00
500,000.00 3,278.69
JUMLAH 3,278.69
97,650.00 7,043.61
42,800.00 4,630.82
34,700.00 2,730.49
26,200.00 1,030.82
9,600.00 1,447.87
JUMLAH 16,883.61
Nilai ASB 20,162.30
500,000.00 3,278.69
JUMLAH 3,278.69
195,150.00 24,313.77
51,700.00 5,424.26
7,450.00 146.56
227,500.00 1,491.80
29,205.30 2,298.12
26,755.30 2,105.34
29,205.30 383.02
JUMLAH 36,162.87
Nilai ASB 39,441.56
500,000.00 3,278.69
JUMLAH 3,278.69
20,250.00 824.89
117,741.25 159.87
50,100.92 5,660.11
1,784,684.36 5,815.98
18,901.15 2,135.34
135,517.96 1,332.96
Jumlah 15,929.17
Nilai ASB 19,207.86
500,000.00 3,278.69
JUMLAH 3,278.69
20,250.00 473.25
13,753.60 356.24
76,305.40 4,723.43
117,741.25 203.83
418,649.94 362.37
2,777,913.59 17,195.74
Jumlah 23,314.86
Nilai ASB 26,593.55
500,000.00 3,278.69
JUMLAH 3,278.69
459,150.00 18,064.92
450,000.00 2,950.82
58,250.00 3,055.74
69,000.00 22,622.95
77,937.50 12,776.64
281,900.00 3,697.05
19,060.00 249.97
19,060.00 249.97
185,120.00 2,427.80
JUMLAH 66,095.85
Nilai ASB 69,374.54
HARGA
JUMLAH (Rp)
SATUAN (Rp)
500,000.00 3,278.69
JUMLAH 3,278.69
20,250.00 3,537.44
45,600.00 8,970.49
5,062.50 221.09
117,741.25 3,582.42
117,741.25 5,983.57
JUMLAH 22,295.02
Nilai ASB 25,573.71
500,000.00 3,278.69
JUMLAH 3,278.69
3,457,113.56 153,019.78
1,880,541.98 42,295.55
1,880,541.98 7,102.90
2,777,913.59 73,774.10
419,259.66 27,525.43
2,777,913.59 10,656.26
2,777,913.59 87,435.97
2,777,913.59 115,930.73
419,259.66 4,845.54
2,777,913.59 20,401.73
JUMLAH 542,987.98
Nilai ASB 546,266.66
500,000.00 3,278.69
JUMLAH 3,278.69
50,100.92 134,566.15
18,901.15 101,533.26
5,865.60 11,231.18
427,332.94 34,740.07
179,720.00 8,885.83
JUMLAH 290,956.48
Nilai ASB 294,235.17
500,000.00 3,278.69
JUMLAH 3,278.69
69,654.00 68,397.94
106,978.74 14,591.20
76,305.40 2,626.91
106,978.74 124,586.39
22,569.25 1,553.95
JUMLAH 211,756.39
Nilai ASB 215,035.08
500,000.00 3,278.69
JUMLAH 3,278.69
284,491.72 21,938.51
284,491.72 5,798.03
55,973.40 5,787.83
332,624.50 33,524.38
6,617,060.00 99,362.64
JUMLAH 166,411.39
Nilai ASB 169,690.08
500,000.00 3,278.69
JUMLAH 3,278.69
65,130.00 107,191.17
5,273,760.00 67,725.45
62,276.80 469.27
62,276.80 824.26
81,248.35 133,718.80
49,958.25 12,121.02
69,049.16 31,128.72
118,263.44 7,754.98
JUMLAH 360,933.67
Nilai ASB 364,212.36
500,000.00 3,278.69
JUMLAH 3,278.69
113,412.72 181,274.43
4,683.00 7,630.99
JUMLAH 188,905.42
Nilai ASB 192,184.10
500,000.00 3,278.69
JUMLAH 3,278.69
21,821.40 22,495.03
11,820.00 63,494.71
21,821.40 34,878.47
39,277.80 7,658.78
6,287.50 10,347.99
5,287.20 8,450.85
JUMLAH 147,325.83
Nilai ASB 150,604.52
500,000.00 3,278.69
JUMLAH 3,278.69
97,650.00 7,043.61
42,800.00 4,630.82
34,700.00 2,730.49
26,200.00 1,030.82
9,600.00 1,447.87
JUMLAH 16,883.61
Nilai ASB 20,162.30
500,000.00 3,278.69
JUMLAH 3,278.69
195,150.00 24,313.77
51,700.00 5,424.26
7,450.00 146.56
227,500.00 1,491.80
29,205.30 2,298.12
26,755.30 2,105.34
29,205.30 383.02
JUMLAH 36,162.87
Nilai ASB 39,441.56
500,000.00 3,278.69
JUMLAH 3,278.69
20,250.00 824.89
117,741.25 159.87
50,100.92 5,660.11
1,784,684.36 5,815.98
18,901.15 2,135.34
135,517.96 1,332.96
Jumlah 15,929.17
Nilai ASB 19,207.86
500,000.00 3,278.69
JUMLAH 3,278.69
20,250.00 473.25
13,753.60 356.24
76,305.40 4,723.43
117,741.25 203.83
418,649.94 362.37
2,777,913.59 17,195.74
Jumlah 23,314.86
Nilai ASB 26,593.55
500,000.00 3,278.69
JUMLAH 3,278.69
459,150.00 18,064.92
450,000.00 2,950.82
58,250.00 3,055.74
69,000.00 22,622.95
77,937.50 12,776.64
281,900.00 3,697.05
19,060.00 249.97
19,060.00 249.97
185,120.00 2,427.80
JUMLAH 66,095.85
Nilai ASB 69,374.54
HARGA
JUMLAH (Rp)
SATUAN (Rp)
500,000.00 3,278.69
JUMLAH 3,278.69
20,250.00 3,537.44
45,600.00 8,970.49
5,062.50 221.09
117,741.25 3,582.42
117,741.25 5,983.57
JUMLAH 22,295.02
Nilai ASB 25,573.71
500,000.00 3,278.69
JUMLAH 3,278.69
3,457,113.56 153,019.78
1,880,541.98 42,295.55
1,880,541.98 7,102.90
2,777,913.59 73,774.10
419,259.66 27,525.43
2,777,913.59 10,656.26
2,777,913.59 87,435.97
2,777,913.59 115,930.73
419,259.66 4,845.54
2,777,913.59 20,401.73
JUMLAH 542,987.98
Nilai ASB 546,266.66
500,000.00 3,278.69
JUMLAH 3,278.69
50,100.92 134,566.15
18,901.15 101,533.26
5,865.60 11,231.18
427,332.94 34,740.07
179,720.00 8,885.83
JUMLAH 290,956.48
Nilai ASB 294,235.17
500,000.00 3,278.69
JUMLAH 3,278.69
67,924.00 66,699.14
106,978.74 14,591.20
76,305.40 2,626.91
106,978.74 124,586.39
22,569.25 1,553.95
JUMLAH 210,057.58
Nilai ASB 213,336.27
500,000.00 3,278.69
JUMLAH 3,278.69
281,731.72 21,725.67
281,731.72 5,741.78
55,973.40 5,787.83
332,624.50 19,451.44
4,635,300.00 69,604.27
JUMLAH 122,311.01
Nilai ASB 125,589.70
500,000.00 3,278.69
JUMLAH 3,278.69
22,630.00 37,244.53
4,768,720.00 61,239.75
62,276.80 469.27
62,276.80 824.26
70,547.71 116,107.65
42,312.90 10,266.08
69,049.16 31,128.72
118,263.44 7,754.98
JUMLAH 265,035.23
Nilai ASB 268,313.92
500,000.00 3,278.69
JUMLAH 3,278.69
77,374.84 123,672.90
4,683.00 7,630.99
JUMLAH 131,303.89
Nilai ASB 134,582.58
500,000.00 3,278.69
JUMLAH 3,278.69
21,821.40 22,495.03
11,820.00 63,494.71
21,821.40 34,878.47
39,277.80 7,658.78
6,287.50 10,347.99
5,287.20 8,450.85
JUMLAH 147,325.83
Nilai ASB 150,604.52
500,000.00 3,278.69
JUMLAH 3,278.69
97,650.00 7,043.61
42,800.00 4,630.82
34,700.00 2,730.49
26,200.00 1,030.82
9,600.00 1,447.87
JUMLAH 16,883.61
Nilai ASB 20,162.30
500,000.00 3,278.69
JUMLAH 3,278.69
195,150.00 24,313.77
51,700.00 5,424.26
7,450.00 146.56
227,500.00 1,491.80
29,205.30 2,298.12
26,755.30 2,105.34
29,205.30 383.02
JUMLAH 36,162.87
Nilai ASB 39,441.56
500,000.00 3,278.69
JUMLAH 3,278.69
20,250.00 824.89
117,741.25 159.87
50,100.92 5,660.11
1,784,684.36 5,815.98
18,901.15 2,135.34
135,517.96 1,332.96
Jumlah 15,929.17
Nilai ASB 19,207.86
500,000.00 3,278.69
JUMLAH 3,278.69
20,250.00 473.25
13,753.60 356.24
76,305.40 4,723.43
117,741.25 203.83
418,649.94 362.37
2,777,913.59 17,195.74
Jumlah 23,314.86
Nilai ASB 26,593.55
500,000.00 3,278.69
JUMLAH 3,278.69
459,150.00 18,064.92
450,000.00 2,950.82
58,250.00 3,055.74
69,000.00 22,622.95
77,937.50 12,776.64
281,900.00 3,697.05
19,060.00 249.97
19,060.00 249.97
185,120.00 2,427.80
JUMLAH 66,095.85
Nilai ASB 69,374.54
HARGA
JUMLAH (Rp)
SATUAN (Rp)
350,000.00 3,500.00
Jumlah 3,500.00
43,115.80 1,724.63
20,250.00 9,477.00
5,062.50 1,143.92
106,956.25 16,492.65
87,501.25 34,886.75
Jumlah 63,724.96
Nilai ASB 67,224.96
350,000.00 3,500.00
Jumlah 3,500.00
406,973.71 87,515.63
5,000.00 5,682.50
5,680.80 16,928.78
Jumlah 110,126.91
Nilai ASB 113,626.91
350,000.00 3,500.00
Jumlah 3,500.00
404,051.65 30,410.54
18,606.50 753.56
3,241,888.40 439,081.37
2,907,758.00 32,899.20
Jumlah 503,144.68
Nilai ASB 506,644.68
350,000.00 3,500.00
Jumlah 3,500.00
80,364.00 115,209.83
Jumlah 115,209.83
Nilai ASB 118,709.83
350,000.00 3,500.00
Jumlah 3,500.00
13,093.60 91,396.50
13,753.60 16,146.77
3,000.00 10,800.00
2,200.00 1,760.00
Jumlah 118,343.27
Nilai ASB 121,843.27
350,000.00 3,500.00
Jumlah 3,500.00
58,904.52 124,583.06
64,380.00 136,163.70
49,958.25 21,482.05
46,133.18 22,974.32
62,276.80 1,771.81
67,775.76 145,175.68
2,988.25 8,606.16
Jumlah 460,756.78
Nilai ASB 464,256.78
350,000.00 3,500.00
Jumlah 3,500.00
5,287.20 13,186.70
6,287.50 13,298.06
21,821.40 7,682.88
21,821.40 46,741.44
11,820.00 13,433.43
Jumlah 94,342.51
Nilai ASB 97,842.51
350,000.00 3,500.00
Jumlah 3,500.00
195,150.00 9,757.50
51,700.00 2,068.00
1,500,000.00 15,000.00
29,205.30 584.11
29,205.30 584.11
Jumlah 27,993.71
Nilai ASB 31,493.71