ANALISA HARGA SATUAN KONSTRUKSI

PEMERINTAH KABUPATEN MADIUN


TAHUN ANGGARAN 2019

-1-
2.01.01.01.02.011. 1 m3 Pengurugan Tanah Untuk Peninggian Bangunan Berikut Pemadatan

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.7500
Mandor OH 0.0750
JUMLAH TENAGA KE
B BAHAN
Tanah Urug m3 1.2000
JUMLAH HARGA BA
C PERALATAN
JUMLAH HARGA AL
D Jumlah (A+B+C)
E Margin & Overhead
F Harga Satuan Pekerjaan (D+E)

-2-
RGA SATUAN KONSTRUKSI
TAH KABUPATEN MADIUN
UN ANGGARAN 2019

-3-
Harga Satuan Jumlah Harga
(Rp) (Rp)

75,000.00 56,250.00
90,000.00 6,750.00
JUMLAH TENAGA KERJA 63,000.00

- -
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


63,000.00
6,300.00
69,300.00

-4-
RENCANA SUMBER PENDAN
TAHUN 2018 : Madiun Kegiatan :
Kecamatan : Jiwan Pekerjaan :
Desa/Kelurahan : Sukolilo Lokasi :
Unit Pelaksana : 0 Volume :

NO URAIAN PEKERJAAN VOL. SAT. HARGA

I PEKERJAAN PERSIAPAN
1 Pekerjaan pembersihan lokasi dan pasang bouwplank 1.00 Ls -
2 Pembuatan administrasi 1.00 Ls -

II BAHAN
1 Hollow 2,4 152.63 m1 4,216.67
2 Hollow 4,4 138.00 m1 5,625.00
3 Calsiboard Uk. 244x122x6mm 20.88 Lembar 95,000.00
4 Sekrup 630.85 Buah 350.00
5 List gypsum 1 x 10 cm 32.45 m1 18,150.00
6 Tepung Gypsum 4.64 Kg 4,250.00

III UPAH
1 Tukang Kayu 29.41 O.H 90,000.00
2 Tukang Besi 30.68 O.H 90,000.00
3 Pekerja 16.56 O.H 70,000.00

TOTAL
DIBULATKAN
NA SUMBER PENDANAAN
Pembangunan Plafon Balai Dusun V
Pembangunan Plafond
Balai Dusun 5
29,2 M2'

JUMLAH SUMBER DANA (Rp)


HARGA (Rp) DD KAS DESA SWADAYA

- - - -
- - - -

643,603.74 643,603.74
776,252.50 776,252.50
1,983,163.00 1,983,163.00
220,797.50 220,797.50
588,876.75 588,876.75
19,698.75 19,698.75

2,647,125.00 2,647,125.00 - -
2,761,515.00 2,761,515.00 - -
1,159,200.00 1,159,200.00 - -

10,800,232.24 10,800,232.24 - -
10,800,000.00 10,800,000.00 - -
RENCANA ANGGARAN BIAYA
TAHUN 2018

Kabupaten : Madiun Kegiatan : Pembangunan Plafon Balai Dusu


Kecamatan : Jiwan Pekerjaan : Pembangunan Plafond
Desa/Kelurahan : Sukolilo Lokasi : Balai Dusun 5
Unit Pelaksana : Volume : 29,2 M2'

NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN

( Rp )
I PEKERJAAN PERSIAPAN
1 Pekerjaan pembersihan lokasi dan pasang bouwplank 1.00 Ls -
2 Pembuatan administrasi 1.00 Ls -
SUB TOTAL I
II PEKERJAAN TANAH DAN PASANGAN
1 Pemasangan Rangka Plafond Hollow Galvalume 0.6 x 63.5 m2 121,704.52
2 Pekerjaan Langit-langit Calsiboard tebal 6mm 29.2 m2 55,995.50
3 List langit - langit gypsum 23.10 m1 31,317.00
SUB TOTAL II
I PEKERJAAN PERSIAPAN
1 BOP 1.00 Ls 709,025.02

SUB TOTAL III


JUMLAH TOTAL BIAYA = ( I + II )
DIBULATKAN

TERBILANG : " LIMA PULUH SEMBILAN JUTA SEMBILAN RATUS TUJUH PULUH RIBU RUP
CANA ANGGARAN BIAYA
TAHUN 2018

Pembangunan Plafon Balai Dusun V


Pembangunan Plafond

JUMLAH
HARGA
( Rp )

-
-
-

7,731,279.77
1,636,272.50
723,422.70
10,090,974.98

709,025.02

709,025.02
10,800,000.00
10,800,000.00

ILAN JUTA SEMBILAN RATUS TUJUH PULUH RIBU RUPIAH "


RENCANA ANGGARAN BIAYA
(RAB)

KEGIATAN : PEMBANGUNAN PUSKESMAS PEMBANTU (DID)


PEKERJAAN : PENGADAAN BANGUNAN KESEHATAN PUSKESMAS PEMBANTU SEWULAN KAB. M
LOKASI : KABUPATEN MADIUN
TAHUN ANGGARA: 2018

NO PEKERJAAAN PEKERJAAN SATUAN


VOLUME
A PUSKESMAS PEMBANTU SEWULAN
I PEKERJAAN PERSIAPAN DAN TANAH
1 Pek. Bongkaran bangunan lama 196.25 m2
2 Pek. Pengukuran dan bowplank 14.80 m1
3 Pek. Galian tanah sedalam 1 meter #REF! m3
4 Pek. Urugan kembali tanah galian dipadatkan #REF! m3
5 Timbunan Tanah dari Luar dipadatkan dengan cara mekan #REF! m2
6 Pek. Pengurugan dengan pasir urug ( Bawah Pondasi ) #REF! m3
7 Pek. Pembuatan lubang strouss pile diameter 30 cm #REF! m1

II PEKERJAAN PONDASI
1 Pasangan batu kali belah 15/20 cm ( 1 SP : 6 PP ) #REF! m3
2 Pemasangan batu kali belah kosongan #REF! m3
3 Pemasangan rollag batu merah tebal 1 bata ( 1 SP : 5 PP ) #REF! m2

III PEKERJAAN BETON


1 Pekerjaan beton strous dia 30 cm
- Beton K 175 ( Konvensional ) #REF! m3
- Pembesian besi polos 6 Ø 12 #REF! Kg
- Pembesian besi polos Ø 6 - 150 #REF! Kg
2 Pekerjaan beton sloof 15/20 ( S1 )
- Beton K 225 ( Konvensional ) #REF! m3
- Pembesian besi polos 4 Ø 12 #REF! Kg
- Pembesian besi polos Ø 6 - 150 #REF! Kg
- Pasang bekisting untuk sloof bahan kayu dipakai 2 kali #REF! m2
3 Pekerjaan Kolom 20 x 20 ( K1 )
- Beton K 225 ( Konvensional ) #REF! m3
- Pembesian besi polos 6 Ø 12 #REF! Kg
- Pembesian besi polos Ø 6 - 150 #REF! Kg
- Pasang bekisting untuk kolom bahan kayu dipakai 2 kali #REF! m2
4 Pekerjaan Kolom praktis 11/11 ( KP )
- Beton K 175 ( Konvensional ) #REF! m3
- Pembesian besi polos 4 Ø 10 #REF! Kg
- Pembesian besi polos Ø 6 - 150 #REF! Kg
- Pasang bekisting untuk kolom praktis bahan kayu dipakai#REF! m2
5 Pekerjaan Balok ( B1 ) 15/30
- Beton K 225 ( Konvensional ) #REF! m3
- Pembesian besi polos 6 Ø 12 #REF! Kg
- Pembesian besi polos Ø 6 - 150 #REF! Kg
- Pasang bekisting untuk balok bahan kayu dipakai 2 kali #REF! m2
6 Pekerjaan Balok ( B ) 15/20
- Beton K 225 ( Konvensional ) #REF! m3
- Pembesian besi polos 4 Ø 12 #REF! Kg
- Pembesian besi polos Ø 6 - 150 #REF! Kg
- Pasang bekisting untuk balok bahan kayu dipakai 2 kali #REF! m2
7 Pekerjaan balok latai (BL), ring balk (RB), & ring gewel (RG) 10/15
- Beton K 175 ( Konvensional ) #REF! m3
- Pembesian besi polos 4 Ø 10 #REF! Kg
- Pembesian besi polos Ø 6 - 150 #REF! Kg
- Pasang bekisting untuk ring balk bahan kayu dipakai 3 k #REF! m2
8 Pekerjaan plat leufel tebal = 8 cm
- Beton K 225 ( Konvensional ) #REF! m3
- Pembesian besi polos Ø 10 mm -150 mm #REF! Kg
- Pasang bekisting untuk plat atap teras bahan kayu dipak #REF! m2
8 Pekerjaan plat atap tebal = 10 cm
- Beton K 225 ( Konvensional ) #REF! m3
- Pembesian besi polos Ø 10 mm -150 mm #REF! Kg
- Pasang bekisting untuk plat atap teras bahan kayu dipak #REF! m2
9 Pekerjaan plat meja
- Beton K 225 ( Konvensional ) #REF! m3
- Pembesian besi polos Ø 10 mm -150 mm #REF! Kg
- Pasang bekisting untuk plat atap teras bahan kayu dipak #REF! m2
10 Pekerjaan rabat beton tebal 5 cm #REF! m3

IV PEKERJAAN PASANGAN DAN PLESTERAN


1 Pek. Pemasangan batu merah tebal 1/2 bata ( 1 SP : 3 PP #REF! m2
2 Pek. Pemasangan batu merah tebal 1/2 bata ( 1 SP : 6 PP #REF! m2
3 Pek. Plesteran camp 1 pc : 5 ps tebal 15 mm #REF! m2
4 Pek. Pasang batu candi + Coating #REF! m2
5 Pek. Pasang batu susun sirih + Coating #REF! m2
7 Pek. Pasang ACP #REF! m2
8 Pek. Benangan sudut #REF! m1
9 Acian #REF! m2

V PEKERJAAN LANTAI
2 Pek. Pasangan lantai keramik kasar 40x40 cm #REF! m2
4 Pek. Pasangan lantai keramik motif 20x20 cm #REF! m2
5 Pek. Pasangan dinding keramik 20x25 cm #REF! m2

VI PEKERJAAN RANGKA ATAP


1 Pek. Pasang rangka atap baja ringan profil C75 #REF! m2

VII PEKERJAAN PENUTUP ATAP


1 Pek. Pasang atap genteng karang pilang type italy ( kodok #REF! m2
2 Pek. Pasang genteng wuwung ex.karang pilang #REF! m1

VIII PEKERJAAN PLAFOND


1 Pek. Pemasangan rangka plafond hollow galvalume 0.6x0 #REF! m2
2 Pek. Langit-langit calsiboard tebal 6 mm #REF! m2
3 Pek. Pasang rangka listplank hollow galvalume #REF! m2
4 Pek. Pasang kalsiplank lebar 30 cm #REF! m1
IX PEKERJAAN PINTU DAN JENDELA
1 Pek. Pemasangan Kusen Alumunium Profil Warna (Putih) #REF! m1
2 Pek. Pemasangan Pintu Alumunium #REF! unit
3 Pek. Pemasangan Jendela Alumunium #REF! unit
4 Pek. Pemasangan Slimar Bouven Alumunium #REF! unit
5 Pek. Pasang Kaca Mati Tebal 5 mm #REF! m2

X PEKERJAAN SANITAIR
1 Pek. Pemasangan kran air dia 3/4" atau 1/2" 3.00 Buah
2 Pek. Pemasangan Kloset duduk ex INA komplit 2.00 Unit
3 Pek. Pemasangan Kloset Jongkok Porselin 1.00 Unit
4 Pek. Pemasangan washtafel ex. INA komplit #REF! Unit
5 Pek. Pemasangan pipa PVC 1" type AW untuk air bersih #REF! m1
6 Pek. Pemasangan pipa PVC 3/4" type AW untuk air bersih #REF! m1
7 Pek. Pemasangan pipa PVC 3" type D untuk air kotor #REF! m1
8 Pek. Pemasangan pipa PVC 4" type D untuk air kotor #REF! m1
9 Pek. Pasang Bak Mandi PVC 3.00 Buah
10 Pek. Pemasangan floor drain #REF! Buah
11 Pek. Pipa Stainless 2" 1.20 m1
12 Pek. Septictank dan resapan #REF! Unit

XI PEKERJAAN PENGECATAN
1 Pek. Pengecatan tembok dalam baru 2 lapis ( interior stan #REF! m2
2 Pek. Pengecatan tembok dalam baru 2 lapis ( exterior stan #REF! m2
3 Pek. Pengecatan plafond #REF! m2
4 Pek. Pengecatan listplank #REF! m2

XII PEKERJAAN ELEKTRIKAL


1 Pek. Pemasangan titik stop kontak gedung #REF! Titik
2 Pek. Pemasangan titik lampu #REF! Titik
3 Pek. Pasang lampu SL 18 watt #REF! Titik
4 Pek. Pemasangan lampu spot light LED 20 watt 2.00 Titik
5 Pek. Pemasangan box presto +3 MCB #REF! Buah

XIII PEKERJAAN PEMASANGAN TULISAN


1 Pas. Huruf jenis arial sign kecil, tinggi = 25 cm ( acrilic t 6.00 Buah
" SEWULAN "
2 Pas. Huruf jenis arial sign kecil, tinggi = 18 cm ( acrilic t 17.00 Buah
" PUSKESMAS PEMBANTU "
3 Pas. Logo Puskesmas, tinggi = 55 cm ( acrilic timbul ) 1.00 Buah

SUB TOTAL KESELURUHAN PEKERJAAN


N BIAYA

AS PEMBANTU SEWULAN KAB. MADIUN

HARGA
TOTAL HARGA
SATUAN

Rp 9,900.00 Rp 1,942,889.85
Rp 139,128.50 Rp 2,059,101.73
Rp 60,500.00 #REF!
Rp 44,000.00 #REF!
Rp 119,030.32 #REF!
Rp 201,278.00 #REF!
Rp 46,860.00 #REF!
#REF!

Rp 759,239.25 #REF!
Rp 376,835.58 #REF!
Rp 251,281.25 #REF!
#REF!

### #REF!
Rp 13,253.90 #REF!
Rp 13,253.90 #REF!

### #REF!
Rp 13,253.90 #REF!
Rp 13,253.90 #REF!
Rp 168,509.14 #REF!

### #REF!
Rp 13,253.90 #REF!
Rp 13,253.90 #REF!
Rp 243,395.90 #REF!

### #REF!
Rp 13,253.90 #REF!
Rp 13,253.90 #REF!
Rp 138,079.43 #REF!

### #REF!
Rp 13,253.90 #REF!
Rp 13,253.90 #REF!
Rp 247,850.90 #REF!

### #REF!
Rp 13,253.90 #REF!
Rp 13,253.90 #REF!
Rp 247,850.90 #REF!

### #REF!
Rp 13,253.90 #REF!
Rp 13,253.90 #REF!
Rp 138,079.43 #REF!

### #REF!
Rp 13,253.90 #REF!
Rp 289,155.90 #REF!

### #REF!
Rp 13,253.90 #REF!
Rp 289,155.90 #REF!

### #REF!
Rp 13,253.90 #REF!
Rp 289,155.90 #REF!
Rp 878,834.09 #REF!
#REF!

Rp 126,250.99 #REF!
Rp 121,250.80 #REF!
Rp 56,947.66 #REF!
Rp 382,961.56 #REF!
Rp 424,404.06 #REF!
Rp 580,700.00 #REF!
Rp 10,472.69 #REF!
Rp 31,779.69 #REF!
#REF!

Rp 146,716.63 #REF!
Rp 140,955.38 #REF!
Rp 147,557.85 #REF!
#REF!

Rp 218,726.75 #REF!
#REF!

Rp 151,316.00 #REF!
Rp 156,222.00 #REF!
#REF!

Rp 121,704.52 #REF!
Rp 55,995.50 #REF!
Rp 122,725.19 #REF!
Rp 48,295.50 #REF!
#REF!

Rp 154,941.05 #REF!
### #REF!
Rp 700,000.00 #REF!
Rp 350,000.00 #REF!
Rp 170,717.25 #REF!
#REF!

Rp 241,120.00 Rp 723,360.00
### Rp 4,261,290.00
Rp 444,097.50 Rp 444,097.50
Rp 727,202.30 #REF!
Rp 29,217.65 #REF!
Rp 23,049.81 #REF!
Rp 49,852.00 #REF!
Rp 64,317.00 #REF!
Rp 350,000.00 Rp 1,050,000.00
Rp 78,265.00 #REF!
Rp 153,892.25 Rp 184,670.70
### #REF!
#REF!

Rp 22,418.44 #REF!
Rp 53,552.99 #REF!
Rp 22,418.44 #REF!
Rp 37,574.90 #REF!
#REF!

Rp 254,226.50 #REF!
Rp 428,946.10 #REF!
Rp 41,400.00 #REF!
Rp 82,500.00 Rp 165,000.00
Rp 518,596.10 #REF!
#REF!

Rp 200,000.00 Rp 1,200,000.00

Rp 150,000.00 Rp 2,550,000.00

### Rp 1,000,000.00
Rp 4,750,000.00
#REF!
BAC
UNIT
SA

1 PEKERJAANTANAH DAN PASANGAN


No.
PEKERJAAN SKET GAMBAR
a b c

1 Pemasangan Rangka Plafond Hollow Galvalume 0.6 x 0.6m

JUMLAH

2 Pekerjaan Langit-langit Calsiboard tebal 6mm

JUMLAH

3 List langit - langit gypsum

JUMLAH
BACK UP VOLUME
UNIT BANGUNAN
SALURAN AIR

Analis hitungan
GRID Cad area Tinggi (h) Lebar (b) Tebal (t) Panjang (l) Jumlah (n) Luas
d e f g h i j k

6.20 9.25

6.20 9.25

6.20 9.25 2.00


Volume Keterangan
l m

57.35

57.35 m2

57.35

57.35 m2

30.90

30.90 m1
PEKERJAAN : #REF!
LOKASI : #REF!
### : #REF!
### : 2019

BULAN 1
Bobot
NO ITEM PELAKSANAAN
%
Minggu Minggu
1 2

1 #REF! #REF! #REF! #REF!

2 #REF! #REF! 0.500

3 #REF! #REF! 1.100

4 #REF! #REF!

5 #REF! #REF!

6 #REF! #REF!

7 #REF! #REF!

8 #REF! #REF!

9 #REF! #REF!

10 #REF! #REF!
11 #REF! #REF!

12 #REF! #REF!

13 #REF! #REF!

14 #REF! #REF!

JUMLAH TOTAL BOBOT #REF!


Jumlah % #REF! #REF!
Program Kemajuan Fisik
Komulatif % 0 #REF! #REF!
-
TIME SCHEDULE

BULAN 1 BULAN 2 BULAN 3

Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu


3 4 5 6 7 8 9 10

1.350 #REF!

1.200 1.350 3.150 1.250 #REF!

1.100 1.450 2.150 2.150 3.350 3.450 #REF!

1.250 1.250 4.350 4.150 3.550 3.350 #REF!

4.950 #REF!

#REF! #REF!

#REF!
#REF! #REF!

3.650 #REF! 6.550 7.750 #REF! 11.950 #REF! #REF!


#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
BULAN 3 BULAN 4
KET
Minggu Minggu Minggu Minggu Minggu Minggu
11 12 13 14 15 16

###

#REF! #REF!

50
3.460 #REF!

3.560 5.250 2.850 0.350 #REF!

2.950 #REF!
#REF! #REF!

#REF!

#REF! #REF!

#REF! #REF! 5.250 #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF! #REF!

Dibuat Oleh :
PT/CV..........................................

.................................................
Direktur/Direktris
DAFTAR REKAPITULASI
HARGA SATUAN POKOK KEGIATAN TAHUN 2019
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN MADIUN

NO URAIAN KEGIATAN SATUAN

I BIDANG BINA MARGA


Analisa Pilihan (SNI)
1 Konstruksi Lapis Pondasi Bawah (LPB) Telford Menggunakan Buruh m3
2 Pekerjaan Box Culvert 800x800x1200 mm Beban Gandar min. 20 Ton buah
3 Pekerjaan Box Culvert 1000x1000x1200 mm Beban Gandar min. 20 Ton buah
4 Pekerjaan Box Culvert 1200x1200x1200 mm Beban Gandar min. 20 Ton buah
5 Pekerjaan Box Culvert 1500x1500x1200 mm Beban Gandar min. 20 Ton buah
6 Pekerjaan Box Culvert 1800x1800x1200 mm Beban Gandar min. 20 Ton buah
7 Pekerjaan Box Culvert 2000x2000x1200 mm Beban Gandar min. 20 Ton buah
8 Pekerjaan U-Ditch 600x600x1200 mm Beban Gandar min. 20 Ton buah
9 Pekerjaan U-Ditch 800x800x1200 mm Beban Gandar min. 20 Ton buah
10 Pekerjaan U-Ditch 1000x1000x1200 mm Beban Gandar min. 20 Ton buah
11 Pekerjaan U-Ditch 1200x1200x1200 mm Beban Gandar min. 20 Ton buah
Analisa EI
Divisi 1. Umum
1 Mobilisasi Ls
Divisi 2. Drainase
1 Galian untuk Selokan Drainase dan Saluran Air m3
2 Pasangan Batu dengan Mortar m3
Divisi 3. PEKERJAAN TANAH
1 Galian Biasa m3
2 Galian Batu m3
3 Galian Perkerasan Beraspal dengan Cold Milling Machine m3
4 Galian Perkerasan Beraspal tanpa Cold Milling Machine m3
5 Timbunan Biasa m3
6 Timbunan Pilihan m3
7 Penyiapan Badan Jalan m2
8 Pembersihan dan Pengupasan Lahan m2
9 Pemotongan Pohon Pilihan diameter 15 – 30 cm Pohon
10 Pemotongan Pohon Pilihan diameter 30 – 50 cm Pohon
11 Pemotongan Pohon Pilihan diameter 50 – 75 cm Pohon
12 Pemotongan Pohon Pilihan diameter > 75 cm Pohon
Divisi 4. PELEBARAN PERKERASAN DAN BAHU JALAN
NO URAIAN KEGIATAN SATUAN

Divisi 5. PERKERASAN BERBUTIR


1 Lapis Pondasi Aggregat Kelas A m3
2 Lapis Pondasi Aggregat Kelas B m3
3 Perkerasan Beton Semen m3
4 Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB)) m3
5 Lapis Pondasi Aggregat Dengan Cement Treated Base (CTB) m3
Divisi 6. PERKERASAN ASPAL
1 Lapis Resap Pengikat - Aspal Cair ltr
2 Lapis Perekat - Aspal Cair ltr
3 Agregat Penutup Burtu m2
4 Agregat Penutup Burda m2
5 Latasir Kelas A (SS-A) m2
6 Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang) ton
7 Lataston Lapis Aus Perata (HRS-WC) (L) (gradasi senjang/semi senjang) ton
8 Laston Lapis Aus (AC-WC) (gradasi halus/kasar) ton
9 Laston Lapis Aus Perata (AC-WC (L)) (gradasi halus/kasar) ton
10 Laston Lapis Antara (AC-BC) (gradasi halus/kasar) ton
11 Laston Lapis Antara Perata (AC-BC(L)) (gradasi halus/kasar) ton
12 Lapis Permukaan Penetrasi Macadam m3
Divisi 7. STRUKTUR
1 Beton mutu sedang dengan fc’=30 MPa (K-350) m3
2 Beton mutu sedang dengan fc’= 25 MPa (K-300) m3
3 Beton mutu sedang dengan fc’= 20 MPa (K-250) m3
4 Beton mutu rendah dengan fc’= 15 MPa (K-175) m3
5 Beton Siklop fc’=15 MPa (K-175) m3
6 Beton mutu rendah dengan fc’= 10 MPa (K-125) m3
7 Pembongkaran Pasangan Batu
8 Pembongkaran Beton
Divisi 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
1 Pohon (Penanaman) buah
2 Marka Jalan Termoplastik m2
3 Marka Jalan Bukan Termoplastik m2
4 Patok Pengarah buah
5 Patok Kilometer buah
6 Patok Hektometer buah

II BIDANG PENGAIRAN
A PEKERJAAN PERSIAPAN DAN TANAH
NO URAIAN KEGIATAN SATUAN

1 Pembersihan dan striping/kosrekan m2


2 Pembersihan Lokasi dari Tanaman Diameter < 15 Cm m2
3 Cabut 1 Tunggul tanaman Keras > 15 Cm dan membuang sisa Tunggul dan akarnya bh
4 Uitset trase saluran m1
5 Pasang Profil Melintang Galian Tanah m1
6 Pasang Bowplang m1
7 Pengadaan dan Pemasangan Patok m1
8 Galian Tanah Biasa Sedalam ≤ 1 m (Manual) m3
9 Galian Tanah Biasa Sedalam > 1 m s/d 2 m (Manual) m3
10 Galian Tanah Biasa Sedalam ≤ 1 m (semi mekanis) m3
11 Galian Tanah Biasa Sedalam > 1 m s/d 2 m (semi mekanis) m3
12 Galian Tanah Biasa Sedalam > 2 m s/d 3 m (semi mekanis) m3
13 Galian Tanah Sedalam 2 m s/d 4 m (mekanis) m3
14 Galian Tanah Sedalam > 4 m (mekanis) m3
15 Galian Tanah Berbatu Sedalam ≤ 1 m (Manual) m3
16 Galian Tanah Berbatu > 1 m s/d 2 m (Manual) m3
17 Galian Tanah Berbatu ≤ 1 m (semi mekanis) m3
18 Galian Tanah Berbatu Sedalam > 1 m s/d 2 m (semi mekanis) m3
19 Galian Tanah Berbatu Sedalam > 2 m s/d 3 m (semi mekanis) m3
20 Galian Tanah Cadas Sedalam ≤ 1 m (Manual) m3
21 Galian Tanah Cadas > 1 m s/d 2 m (Manual) m3
22 Galian Tanah Cadas ≤ 1 m (semi mekanis) m3
23 Galian Tanah Cadas Sedalam > 1 m s/d 2 m (semi mekanis) m3
24 Galian Tanah Cadas Sedalam > 2 m s/d 3 m (semi mekanis) m3
25 Galian Lumpur Sedalam ≤ 1 m (Manual) m3
26 Galian Lumpur > 1 m s/d 2 m (Manual) m3
27 Galian Lumpur ≤ 1 m (semi mekanis) m3
28 Galian Lumpur Sedalam > 1 m s/d 2 m (semi mekanis) m3
29 Galian Lumpur > 2 m s/d 3 m (semi mekanis) m3
30 Galian Batu Sedalam ≤ 1 m (Manual) m3
31 Galian Batu > 1 m s/d 2 m (Manual) m3
32 Galian Batu ≤ 1 m (semi mekanis) m3
33 Galian Batu Sedalam > 1 m s/d 2 m (semi mekanis) m3
34 Galian Batu Sedalam > 2 m s/d 3 m (semi mekanis) m3
35 Timbunan / Urugan Tanah Kembali m3
36 Pemadatan Tanah m3
37 Timbunan Pasir sebagai Bahan Pengisi m3
38 Pemadatan Pasir sebagai Bahan Pengisi m3
NO URAIAN KEGIATAN SATUAN

39 Mengangkut hasil galian dengan jarakangkut 5 m m3


40 Mengangkut hasil galian dengan jarakangkut 10 m m3
41 Mengangkut hasil galian dengan jarakangkut 30 m m3
42 Mengangkut hasil galian dengan jarakangkut 50 m m3
43 Mengangkut hasil galian dengan jarakangkut 100 m m3
44 Pendongkelan Rumpun Bambu m2
45 Pendongkelan Rumpun Bambu dan Menimbun Bekas Dongkelan m2

B. PEKERJAAN PASANGAN
1 Pasangan Batu Bata ( 1 Pc : 4 PP ) Bangunan Basah ( Manual ) m3
2 Pasangan Batu Kali ( 1 Pc : 4 PP ) Bangunan Basah ( Manual ) m3
3 Pasangan Batu Kali ( 1 Pc : 4 PP ) Bangunan Basah ( Menggunakan Molen ) m3
Pasangan Batu Kali bekas bongkaran ( 1 Pc : 4 PP ) Bangunan Basah ( Menggunakan
4 m3
Molen )
5 Bongkar Pasangan batu dan Pembersihan Batu m3
6 Pasangan Batu Merah ( 1 Pc : 6 PP ) ( Menggunakan Molen ) m3
7 Pasangan Batu Merah ( 1 Pc : 6 PP ) ( Manual ) m3
8 Pasangan Batu Merah ( 1 Pc : 5 PP ) ( Menggunakan Molen ) m3
9 Pasangan Batu Merah ( 1 Pc : 5 PP ) ( Manual ) m3
10 Pemasangan Batu Merah tebal 1/2bata (1 Pc : 6 Ps) m2
11 Plesteran 1 Pc : 6 Ps tebal 15 mm m2
12 Siaran ( 1 Pc : 2 PP ) m2
13 Siaran ( 1 Pc : 3 PP ) m2
14 Plesteran Tebal 1.5 Cm ( Campuran 1 Pc : 3 PP ) m2
15 Plesteran Tebal 1.5 Cm ( Campuran 1 Pc : 4 PP ) m2
16 Acian m2
17 Pasangan Batu Kosong m3

Bronjong Bentuk I, Type A bronjong kawat Ukuran L=2,0 m x B + 1,0 m x T = 1,0 m.


18 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,7 mm, kawat sisi m3
diameter 3.4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 80 x 100 mm

Bronjong Bentuk I, Type A bronjong kawat Ukuran L=2,0 m x B + 1,0 m x T = 1,0 m.


19 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 3 mm, kawat sisi diameter m3
4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 100 x 120 mm

Bronjong Bentuk I, Type A bronjong kawat Ukuran L=2,0 m x B + 1,0 m x T = 1,0 m.


20 kawat bronjong wire mesh diameter 5 mm ulir dan kawat pengikat diameter 2 mm, m3
lubang kotak 100 x 100 mm
NO URAIAN KEGIATAN SATUAN

Bronjong Bentuk I, Type B bronjong kawat Ukuran L=3,0 m x B = 1,0 m x T = 1,0 m.


21 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,7 mm, kawat sisi m3
diameter 3.4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 80 x 100 mm

Bronjong Bentuk I, Type B bronjong kawat Ukuran L=3,0 m x B = 1,0 m x T = 1,0 m.


22 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 3 mm, kawat sisi diameter m3
4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 100 x 120 mm

Bronjong Bentuk I, Type B bronjong kawat Ukuran L=3,0 m x B = 1,0 m x T = 1,0 m.


23 kawat bronjong wire mesh diameter 5 mm ulir dan kawat pengikat diameter 2 mm, m3
lubang kotak 100 x 100 mm

Bronjong Bentuk I, Type C bronjong kawat Ukuran L=4,0 m x B = 1,0 m x T = 1,0 m.


24 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,7 mm, kawat sisi m3
diameter 3.4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 80 x 100 mm

Bronjong Bentuk I, Type C bronjong kawat Ukuran L=4,0 m x B = 1,0 m x T = 1,0 m.


25 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 3 mm, kawat sisi diameter m3
4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 100 x 120 mm

Bronjong Bentuk I, Type C bronjong kawat Ukuran L=4,0 m x B = 1,0 m x T = 1,0 m.


26 kawat bronjong wire mesh diameter 5 mm ulir dan kawat pengikat diameter 2 mm, m3
lubang kotak 100 x 100 mm

Bronjong Bentuk I, Type D bronjong kawat Ukuran L=2,0 m x B = 1,0 m x T = 0,5 m.


27 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,7 mm, kawat sisi m3
diameter 3.4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 80 x 100 mm

Bronjong Bentuk I, Type D bronjong kawat Ukuran L=2,0 m x B = 1,0 m x T = 0,5 m.


28 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 3 mm, kawat sisi diameter m3
4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 100 x 120 mm

Bronjong Bentuk I, Type D bronjong kawat Ukuran L=2,0 m x B = 1,0 m x T = 0,5 m.


29 kawat bronjong wire mesh diameter 5 mm ulir dan kawat pengikat diameter 2 mm, m3
lubang kotak 100 x 100 mm

Bronjong Bentuk I, Type E bronjong kawat Ukuran L=3,0 m x B = 1,0 m x T = 0,5 m.


30 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,7 mm, kawat sisi m3
diameter 3.4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 80 x 100 mm

Bronjong Bentuk I, Type E bronjong kawat Ukuran L=3,0 m x B = 1,0 m x T = 0,5 m.


31 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 3 mm, kawat sisi diameter m3
4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 100 x 120 mm
NO URAIAN KEGIATAN SATUAN

Bronjong Bentuk I, Type E bronjong kawat Ukuran L=3,0 m x B = 1,0 m x T = 0,5 m.


32 kawat bronjong wire mesh diameter 5 mm ulir dan kawat pengikat diameter 2 mm, m3
lubang kotak 100 x 100 mm

Bronjong Bentuk I, Type F bronjong kawat Ukuran L=4,0 m x B = 1,0 m x T = 0,5 m.


33 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,7 mm, kawat sisi m3
diameter 3.4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 80 x 100 mm

Bronjong Bentuk I, Type F bronjong kawat Ukuran L=4,0 m x B = 1,0 m x T = 0,5 m.


34 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 3 mm, kawat sisi diameter m3
4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 100 x 120 mm

Bronjong Bentuk I, Type F bronjong kawat Ukuran L=4,0 m x B = 1,0 m x T = 0,5 m.


35 kawat bronjong wire mesh diameter 5 mm ulir dan kawat pengikat diameter 2 mm, m3
lubang kotak 100 x 100 mm

36 Pasang Bronjong Pabrikasi Bentuk I. ( tenaga Kerja untuk 1 m3 batu bronjong) m3

Bronjong Bentuk II, Type G bronjong kawat Ukuran L=6,0 m x B = 2,0 m x T = 0,17 m.
37 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,0 mm, kawat sisi m3
diameter 3.4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 60 x 80 mm

Bronjong Bentuk II, Type G bronjong kawat Ukuran L=6,0 m x B = 2,0 m x T = 0,17 m.
38 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,7 mm, kawat sisi m3
diameter 4.0 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 80 x 100 mm

Bronjong Bentuk II, Type H bronjong kawat Ukuran L=6,0 m x B = 2,0 m x T = 0,23 m.
39 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,0 mm, kawat sisi m3
diameter 3.4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 60 x 80 mm

Bronjong Bentuk II, Type H bronjong kawat Ukuran L=6,0 m x B = 2,0 m x T = 0,23 m.
40 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,7 mm, kawat sisi m3
diameter 4.0 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 80 x 100 mm

Bronjong Bentuk II, Type I bronjong kawat Ukuran L=6,0 m x B = 2,0 m x T = 0,3 m.
41 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,0 mm, kawat sisi m3
diameter 3.4 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 60 x 80 mm

Bronjong Bentuk II, Type I bronjong kawat Ukuran L=6,0 m x B = 2,0 m x T = 0,3 m.
42 kawat bronjong galvanis kawat anyaman 3 lilitan diameter 2,7 mm, kawat sisi m3
diameter 4.0 mm dan kawat pengikat diameter 2 mm, lubang hexagonal 80 x 100 mm

43 Pasang Bronjong Pabrikasi Bentuk II. ( tenaga Kerja untuk 1 m3 batu bronjong) m3
44 Pasang cerucuk bambu diameter 8 - 10 cm m1
45 Pasangan Batu Muka m2
46 Pembabatan Rumput Manual m2
NO URAIAN KEGIATAN SATUAN

47 Pembabatan Rumput Semi Mekanis m2


48 Pasang Kalsiplank Lebar 20 cm Tebal 8 mm m1
49 Pemasangan lapisan ijuk m2
Pemasangan Batu Kali Belah Kosongan
50 m3
51 Pasang pondasi siklop 40% batu kali Tanpa Tulangan m3
52 Pasang Atap Seng BJLS 30 m2
Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
53 m2
Pengecatan bidang Tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
54 m2
penutup)

C. PEKERJAAN BETON
1 Beton Tumbuk untuk lantai kerja ( K-40 s/d K-60 ) Setara 1 Pc : 3 Pb : 5 Kr m3
2 Beton Tumbuk untuk lantai kerja ( K-80 s/d K-100 ) Setara 1 Pc : 2 Pb : 3 Kr m3
3 Beton Tumbuk untuk lantai kerja ( K-100 ) Setara 1 Pc : 2 Pb : 3 Kr m3
4 Beton K-100 ( Manual ) m3
5 Beton K-100 ( Menggunakan molen ) m3
6 Beton K-125 ( Manual ) m3
7 Beton K-125 ( Menggunakan molen ) m3
8 Beton K-150 ( Manual ) m3
9 Beton K-150 ( Menggunakan molen ) m3
10 Beton K-175 ( Manual ) m3
11 Beton K-175 ( Menggunakan molen ) m3
12 Beton K-200 ( Manual ) m3
13 Beton K-200 ( Menggunakan molen ) m3
14 Beton K-225 ( Manual ) m3
15 Beton K-225 ( Menggunakan molen ) m3
16 Beton K-250 ( Manual ) m3
17 Beton K-250 ( Menggunakan molen ) m3
18 Beton K-275 ( Manual ) m3
19 Beton K-275 ( Menggunakan molen ) m3
20 Beton K-300 ( Manual ) m3
21 Beton K-300 ( Menggunakan molen ) m3
22 Beton K-325 ( Manual ) m3
23 Beton K-325 ( Menggunakan molen ) m3
24 Beton K-350 ( Manual ) m3
25 Beton K-350 ( Menggunakan molen ) m3
26 Beton Menggunakan Ready Mixed 175 dan Menggunakan Pompa Beton m3
Mengangkut / Menaikan Campuran Beton ≥ 5m, bton dicor dengan tapak berjarak <
27 m3
25 m dengan beda tinggi < 1 m
NO URAIAN KEGIATAN SATUAN

Mengangkut / Menaikan Campuran Beton ≥ 5m, beton dicor dengan tapak


28 m3
berjarakdengan setiap tambahan jarak 25 m
29 Mengangkut / Menaikan Campuran Beton ≥ 5m, Menggunakan Pompa Beton m3
30 Pemadatan Beton pada saat mengecor menggunakan vibrator m3
31 Pemadatan Beton pada saat mengecor manual ( Menggunakan Penusuk Besi Beton ) m3
32 Pembesian 100 Kg dengan Besi Polos untuk Plat 100 Kg
33 Pembesian 1 Kg dengan Besi Polos untuk Plat Kg
34 Pembesian 100 Kg dengan Besi Ulir untuk Plat 100 Kg
35 Pembesian 1 Kg dengan Besi Ulir untuk Plat Kg
36 Pembesian 100 Kg dengan Besi Polos untuk Kolom, Balok, Ring Balk dan Sloff 100 Kg
37 Pembesian 1 Kg dengan Besi Polos untuk Kolom, Balok, Ring Balk dan Sloff Kg
38 Pembesian 100 Kg dengan Besi Ulir untukuntuk Kolom, Balok, Ring Balk dan Sloff 100 Kg
39 Pembesian 1 Kg dengan Besi Ulir untukuntuk Kolom, Balok, Ring Balk dan Sloff Kg
40 Bekisting Lantai Beton expose dengan multiflex 18 mm m2
41 Bekisting Lantai Beton biasa dengan multiflex 12 mm m2
42 Bekisting Lantai Beton biasa menggunakan papan Kayu 3/20 cm m2
43 Perancah Bekisting Lantai menggunakan Kaso 5/7 cm, Tinggi 4 m, JAT ≤ 60 Cm m2
44 Perancah Bekisting Lantai menggunakan Dolken 8-10 cm, Tinggi 4 m, JAT ≤ 80 Cm m2
45 Perancah Bekisting Lantai menggunakan Bambu 8-10 cm, Tinggi 4 m, JAT ≤ 80 Cm m2
46 Bekisting Balok Beton biasa dengan multiflex 12 mm m2
47 Bekisting Balok Beton biasa menggunakan papan Kayu 3/20 cm m2
48 Perancah Bekisting Balok menggunakan Kaso 5/7 cm, Tinggi 4 m, JAT ≤ 1 m m2
49 Perancah Bekisting Balok menggunakan Dolken 8-10 cm, Tinggi 4 m, JAT ≤ 1.2 m m2
50 Perancah Bekisting Balok menggunakan Bambu 8-10 cm, Tinggi 4 m, JAT ≤ 1 m m2
51 Bekisting Kolom Beton biasa dengan multiflex 12 mm m2
52 Bekisting Kolom Beton biasa menggunakan papan Kayu 3/20 cm m2
53 Perancah Bekisting Kolom menggunakan Kaso 5/7 cm, Tinggi 4 m, JAT ≤ 1 m m2
54 Perancah Bekisting Kolom menggunakan Dolken 8-10 cm, Tinggi 4 m, JAT ≤ 1.2 m m2
55 Perancah Bekisting Kolom menggunakan Bambu 8-10 cm, Tinggi 4 m, JAT ≤ 1 m m2
56 Bekisting Dinding Beton expose dengan multiflex 18 mm m2
57 Bekisting Dinding Beton biasa dengan multiflex 12 mm m2
58 Bekisting Dinding Beton biasa menggunakan papan Kayu 3/20 cm m2
59 Perancah Bekisting Dinding menggunakan Kaso 5/7 cm, Tinggi maks 2.5 m m2
60 Bekisting Pondasi dan sloof Beton biasa dengan multiflex 12 mm m2
61 Bekisting Pondasi dan sloof Beton biasa menggunakan papan Kayu 3/20 cm m2
62 Perancah Bekisting Pondasi dan sloof menggunakan Kaso 5/7 cm, Tinggi maks 2 m m2
63 Pembongkaran Bekisting secara biasa m2
64 Pembongkaran Bekisting secara hati hati m2
NO URAIAN KEGIATAN SATUAN

65 Pembongkaran Beton secara Konvensional m3


66 Pembongkaran Beton Dengan Jack Hammer m3
67 Pembuatan kistdam pasir/tanah dibungkus karung plastik ukuran 43 Cm x 65 Cm m3
68 Pembuatan Kerangka Kayu Kistdam Pasir / Tanah ukuran 43 cm x 65 Cm m3
69 Pembuatan Lubang Strouss Pile Diameter 25 cm m1
70 Pembuatan lubang strouss pile diameter 30 cm m1
Pembesian 10 kg dengan besi polos
71 10 Kg
Pembesian 1 kg dengan besi polos
72 Kg
Pembesian 10 kg dengan besi ulir
73 10 Kg
Pembesian 1 kg dengan besi ulir
74 Kg
75 Membuat Beton Bertulang Strous dg150 Kg Besi m3
76 Membuat Kolom Praktis Beton Bertulang Uk 11 x 11 cm m1
77 Membuat Ring Balok Beton Bertulang Uk.10 x 15 cm m1

D. PEKERJAAN PEMBORAN
1 Pengoperasian Pompa Air Diesel untuk pengeringan Jam
2 Pengeboran diameter 8 3/4" m
3 Reaming diameter 8 3/4" - 12" m
4 Reaming diameter 8 3/4" - 14 3/4" m
5 Pengadaan dan Pemasangan Pipa Sumur PVC 6" m
6 Pengadaan dan Pemasangan Pipa Sumur PVC 6" ( screen) m
7 Pengadaan dan Pemasangan Pipa Sumur PVC 8" m
8 Pengadaan dan Pemasangan Pipa Sumur PVC 8" ( screen) m
9 Pengadaan dan Pemasangan gravel pack m3
10 Pencucian Sumur Jam
11 Uji Pemompaan Jam
12 Pengadaan dan Pemasangan Pipa GI Diameter 3" m1
13 Pengadaan dan Pemasangan Pipa GI Diameter 4" m1
14 Pengadaan dan Pemasangan Pipa PVC Klas AW Diameter 1" m1
15 Pengadaan dan Pemasangan Pipa PVC Klas AW Diameter 1 1/2" m1
16 Pengadaan dan Pemasangan Pipa PVC Klas AW Diameter 2" m1
17 Pengadaan dan Pemasangan Pipa PVC Klas AW Diameter 3" m1
18 Pengadaan dan Pemasangan Pipa PVC Klas AW Diameter 4" m1
19 Pengadaan dan Pemasangan Pipa PVC Klas AW Diameter 6" m1
20 Pengadaan dan Pemasangan Pipa PVC Klas D Diameter 1 1/2" m1
21 Pengadaan dan Pemasangan Pipa PVC Klas D Diameter 2" m1
22 Pengadaan dan Pemasangan Pipa PVC Klas D Diameter 3" m1
23 Pengadaan dan Pemasangan Pipa PVC Klas D Diameter 4" m1
NO URAIAN KEGIATAN SATUAN

24 Pengadaan dan Pemasangan Pipa PVC Klas D Diameter 6" m1


25 Pemasangan & Pengelasan Mesin Pompa Unit
26 Pekerjaan Pintu Rumah Pompa (2 m x 2 m) Unit
27 Ongkos Kerja Pabrikasi dan Pemasangan Baja Kg
28 Pengadaan/Pemasangan Pipa Besi dia. 10" m1
29 Pasang dan Bongkar Peralatan uji pemompaan 1 lokasi
30 Pasang Patok Sumur 1 lokasi
31 Electric logging 1 lokasi

E. PEKERJAAN PINTU AIR


1 Pembuatan Papan Nama dengan printing banner Plastik Ukuran 90 cm x 110 cm 1 lokasi
2 Pengerjaan perakitan kontruksi besi / baja 100 Kg
3 Pembuatan Pintu Besi Palt Baja Tebal 2 mm rangkap, rangka baja siku 1 m2
4 Pemasangan Pintu Air 1 m2
5 Pelumasan pintu air pintu angkat Bh
6 Pelumasan pintu air pintu sorong Kayu dengan roda gigi, stang tunggal < 1 m Bh
7 Pelumasan pintu air pintu sorong Kayu dengan roda gigi, stang doble < 1 m Bh
8 Pelumasan pintu air pintu sorong Kayu dengan roda gigi, stang tunggal 1 - 2 m Bh
9 Pelumasan pintu air pintu sorong Kayu dengan roda gigi, stang Dobel 1 - 2 m Bh
10 Pelumasan pintu air pintu sorong Kayu dengan roda gigi, stang tunggal > 2 m Bh
11 Pelumasan pintu air pintu sorong Kayu dengan roda gigi, stang Dobel > 2 m Bh
12 Pelumasan pintu air pintu sorong Baja dengan roda gigi, stang Tunggal < 1 m Bh
13 Pelumasan pintu air pintu sorong Baja dengan roda gigi, stang Dobel < 1 m Bh
14 Pelumasan pintu air pintu sorong Baja dengan roda gigi, stang Tunggal 1-2 m Bh
15 Pelumasan pintu air pintu sorong Baja dengan roda gigi, stang Dobel 1-2 m Bh
16 Pelumasan pintu air pintu sorong Baja dengan roda gigi, stang Tunggal > 2 m Bh
17 Pelumasan pintu air pintu sorong Baja dengan roda gigi, stang Dobel > 2 m Bh
18 Pembuatan Pintu Air Type A (B=1950mm, H=2600mm, H'=5550mm) Buah
19 Pembuatan Pintu Air Type B (B=1000mm, H=1400mm, H'=3200mm) Buah
20 Pembuatan Pintu Air Type C2 (B=1000mm, H=2000mm, H'=3000mm) Buah
21 Pembuatan Pintu Air Type C3 (B=600mm, H=600mm, H'=3000mm) Buah

III BIDANG TATA RUANG DAN BANGUNAN GEDUNG


A Pekerjaan Persiapan
1 Pagar sementara seng gelombang tinggi 2 m m1
2 Pagar sementara kawat duri tinggi 1,8 m m2
1 Pengukuran dan pemasangan bowplank m1
2 Uitzet Dengan WaterPass / Theodolit Hari
3 Pengangkutan Material Ke Lokasi Sejauh 50 m m3
NO URAIAN KEGIATAN SATUAN

4 Pembersihan Lapangan dan Perataan m2


5 Pembuatan Kantor Sementara Lantai Plesteran m2
2 Pembongkaran Penutup Atap Tidak Dipakai Kembali m2
3 Pembongkaran Penutup Atap dan Dipakai Kembali m2
4 Pembongkaran Dinding Tembok Bata dengan Pembersihan m3
5 Pembongkaran dan Pembersihan Lantai Tegel dan Bata Merah (Dipakai Kembali) m2
6 Pembongkaran Beton Bertulang m3
7 Pembongkaran Plesteran dengan Membersihkan m2
8 Pemasangan Kawat Berduri 18 Baris m1
9 Pemasangan Kawat Berduri 12 Baris m1
12 Pemasangan Kawat Berduri 6 Baris m1
13 Membersihkan Parit Samping Jalan Menggunakan Buruh m1
13 Bongkar & Pasang Atap Genteng Beton Setara Ex. Cisangkan m2
B Pekerjaan Tanah
1 Galian tanah biasa sedalam 1 meter m3
2 Galian tanah biasa sedalam 2 meter m3
3 Galian tanah keras sedalam 1 meter m3
4 Galian tanah cadas sedalam 1 meter m3
5 Galian tanah lumpur sedalam 1 meter m3
6 Galian tanah lumpur pada lokasi yang sulit m3
6 Pembuangan tanah sejauh 30 meter m3
7 Pembuangan tanah sejauh 150 meter m3
8 Pengangkutan tanah keluar proyek m3
9 Pengangkutan Material Ke Lokasi per 20 Km m3
10 Pengangkutan Pipa PVC dia. 4" sejauh 200 meter Lonjor
11 Pengangkatan tanah dari lubang galian yang dalamnya < 1 m (untuk tiap meter) m3
12 Pengangkatan lumpur dari lubang galian yang dalamnya < 1 m (untuk tiap meter) m3
2 Pengurugan kembali galian tanah m3
3 Pengurugan tanah kembali untuk jembatan m3
8 Pengurugan 1m3 tanah padat ( manual ) m3
3 Pengurugan dengan Pasir Urug m3
4 Pengurugan 1 m3 Sirtu Padat ( Manual ) m3
5 Pengurugan kerikil m3
6 Galian Tanah biasa untuk Timbunan / dibuang m3
7 Galian Tanah Berbatu untuk Dibuang ±50 M m3
8 Galian Tanah Keras / Cadas utk Dibuang ±50 M m3
9 Timbunan Tanah Kembali Dipadatkan dan Dirapikan (manual) m3
11 Pemadatan Tanah Timbunan dan dirapikan per 20 cm (Mekanis) m3
12 Pemadatan Tanah Timbunan dan dirapikan (Manual) m3
4 Timbunan Tanah dari Luar dipadatkan dengan cara mekanis m3
NO URAIAN KEGIATAN SATUAN

5 Timbunan Tanah dari Luar dipadatkan dan dirapikan (manual) m3


6 Timbunan Sirtu dipadatkan dan dirapikan (manual) m3
7 Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan m2
13 Timbunan Sirtu dari Luar dipadatkan dengan cara mekanis m3
14 Pekerjaan stripping m2
15 Perbaikan dan Pemadatan Talud m3
16 Pemasangan Trucuk Bambu Ø 8 s/d 12 - P.2,5 m Batang
17 Pemasangan Trucuk Kayu Gelam Ø 8 s/d 12 - P 2,5 m Batang
15 Pemasangan Perancah Bambu m2
16 Pemasangan Perancah Kayu gelam m2
17 Pemasangan Turap Papan tebal 2 cm m2
18 Pemasangan Turap Bambu tinggi 1,5 m m1
19 Pemasangan Turap Bambu tinggi 2,75 m m1
16 Pembuatan lubang strouss pile diameter 25 cm m1
5 Pembuatan lubang strouss pile diameter 30 cm m1
6 Pembuatan lubang strouss pile diameter 100 cm m1
7 Pengupasan Tanah dan Pembersihan Semak Pada DAMIJA Menggunakan Buruh m2
8 Pembuatan & Pembongkaran Kisdam dengan tinggi > 1 M Buah
9 Pengeringan/pemompaan Air jam
18 Bongkaran Pasangan Batu Kali dan Dibersihkan m3
19 Galian Tanah Untuk Konstruksi Menggunakan Buruh m3
Penimbunan dan Pemadatan untuk Jembatan dan Gorong-Gorong Menggunakan
20 m3
Buruh
19 Pekerjaan Galian tanah Menggunakan Alat Berat m3
20 Pengurugan Tanah Taman Terolah m3
C Pekerjaan Pondasi
1 Pemasangan Batu Kali Belah 15/20 cm ( 1Pc : 1 Ps) m3
2 Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 2 Ps) m3
1 Pemasangan Batu Kali Belah 15/20 cm (1 SP : 3 PP) m3
2 Pemasangan Batu Kali Belah 15/20 cm (1 SP : 4 PP) m3
3 Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 4 Ps) Bangunan Air m3
3 Pasangan Batu Kali Belah 15/20 cm (1 SP : 5 PP) m3
1 Pasangan Batu Kali Belah 15/20 cm (1 SP : 6 PP) m3
2 Pasangan Batu Kali Belah 15/20 cm (1 SP : 8 PP) m3
Pemasangan Batu Kali Belah Kosongan
2 m3
3 Pasang pondasi siklop 40% batu kali m3
4 Pengadaan Tiang Pancang 40 x 40 cm m1
5 Pemancangan Tiang Pancang 40 x 40 cm m1
6 Tiang Pancang Dolken D=0.10 M; L=3.00M; masuk = 2.00 M Batang
7 Tiang Pancang Bongkotan Bambu D=0.10 M; L=3.00M; masuk = 2.00 M Batang
NO URAIAN KEGIATAN SATUAN

8 Pengadaan Tiang Pancang 30 x 30 cm m1


9 Pemancangan Tiang Pancang 30 x 30 cm m1
D Pekerjaan Beton
1 Bekisting untuk Beton Struktur Menggunakan Buruh m2
1 Pasang bekisting untuk pondasi m2
2 Pasang bekisting untuk pondasi bahan kayu dipakai 2 kali m2
3 Pasang bekisting untuk sloof m2
1 Pasang bekisting untuk sloof Bahan Kayu dipakai 2 kali m2
5 Pasang bekisting untuk kolom m2
2 Pasang bekisting untuk kolom Bahan Kayu dipakai 2 kali m2
3 Pasang bekisting untuk balok m2
3 Pasang bekisting untuk balok Bahan Kayu dipakai 2 kali m2
4 Pasang bekisting untuk plat lantai m2
4 Pasang bekisting untuk plat lantai Bahan Kayu dipakai 2 kali m2
5 Pasang bekisting untuk tangga m2
6 Pasang bekisting untuk plat tangga Bahan Kayu dipakai 2 kali m2
7 Pasang bekisting Beton dengan Perancah Stager m2
13 Pasang bekisting untuk kolom praktis, balok latai dan ring balk Bahan Kayu m2
Pasang bekisting untuk kolom praktis, balok latai dan ring balk Bahan Kayu dipakai 2
14 m2
kali
Pasang bekisting untuk kolom praktis, balok latai dan ring balk Bahan Kayu dipakai 3
5 m2
kali
6 Pembesian dengan besi polos Kg
7 Pembesian dengan besi Ulir Kg
8 Pegecoran Beton Mutu f'c = 7,4 MPa ( K 100 ) m3
9 Pegecoran Beton Mutu f'c = 9,8 MPa ( K 125 ) m3
10 Pegecoran Beton Mutu f'c = 12,2 MPa ( K 150 ) m3
11 Pegecoran Lantai Kerja Beton Mutu f'c = 7,4 MPa ( K 100 ) m3
7 Pegecoran Beton Mutu f'c = 14,5 MPa ( K 175 ) m3
8 Pegecoran Beton Mutu f'c = 16,9 MPa ( K 200 ) m3
8 Pegecoran Beton Mutu f'c = 19,3 MPa ( K 225 ) m3
9 Pegecoran Beton Mutu f'c = 21,7 MPa ( K 250 ) m3
10 Pegecoran Beton Mutu f'c = 24,0 MPa ( K 275 ) m3
11 Pegecoran Beton Mutu f'c = 26,4 MPa ( K 300 ) m3
12 Pegecoran Beton Mutu f'c = 28,8 MPa ( K 325 ) m3
13 Pegecoran Beton Mutu f'c = 31,2 MPa ( K 350 ) m3
14 Pegecoran Beton menggunakan Ready Mixed dan pompa beton dengan Mutu K 125 m3
15 Pegecoran Beton menggunakan Ready Mixed dan pompa beton dengan Mutu K 150 m3
16 Pegecoran Beton menggunakan Ready Mixed dan pompa beton dengan Mutu K 175 m3
17 Pegecoran Beton menggunakan Ready Mixed dan pompa beton dengan Mutu K 225 m3
18 Pegecoran Beton menggunakan Ready Mixed dan pompa beton dengan Mutu K 250 m3
NO URAIAN KEGIATAN SATUAN

19 Pegecoran Beton menggunakan Ready Mixed dan pompa beton dengan Mutu K 300 m3
20 Pegecoran Beton menggunakan Ready Mixed dan pompa beton dengan Mutu K 350 m3
21 Pegecoran Beton menggunakan Ready Mixed dan pompa beton dengan Mutu K 400 m3
22 Pegecoran Beton menggunakan Ready Mixed dan pompa beton dengan Mutu K 500 m3
23 Err:509 Err:509
39 Membuat Pondasi Beton Bertulang dg150 Kg Besi dan Bekisting m3
40 Membuat Beton Bertulang Strous dg150 Kg Besi m3
41 Membuat Beton Bertulang Sloof (200 Kg Besi + Bekisting) m3
42 Membuat Kolom Praktis Beton Bertulang Uk 11 x 11 cm m1
43 Membuat Ring Balok Beton Bertulang Uk.10 x 15 cm m1
44 Membuat Kolom Beton Bertulang dg 200 Kg Besi dan Bekisting m3
45 Membuat Balok Beton Bertulang dg 200 Kg Besi dan Bekisting m3
46 Membuat Plat Lantai Beton Bertulang dg 150 Kg Besi dan Bekisting m3
47 Membuat Tangga Beton Bertulang dg 200 Kg Besi dan Bekisting m3
48 Pembongkaran Cetakan Dan Penyiraman Beton m3
E Pekerjaan Besi & Baja
1 Ongkos kerja Perakitan dan Pemasangan Baja (Erection) Kg
2 Pekerjaan Besi Plat Bordes Kg
3 Pekerjaan Besi Plat Tebal 2 mm Kg
4 Pekerjaan Besi Plat Strip Kg
5 Pekerjaan Besi Baja Profil WF Kg
6 Pekerjaan Besi Baja Kanal C Kg
7 Pekerjaan Besi Baja siku untuk rangka Kg
8 Gorong-gorong Buis Beton diameter = 0.8 (K-225) bertulang t = 8 cm m3
9 Gorong-gorong Buis Beton diameter = 1.00 M (K-225) bertulang t = 10 cm m3
8 Pemasangan Pipa Beton dia 20 cm m1
9 Pemasangan Pipa Beton dia 30 cm m1
10 Pemasangan Pipa Beton dia 40 cm m1
11 Pemasangan Pipa Beton dia 50 cm m1
12 Pemasangan Pipa Beton dia 60 cm m1
13 Pemasangan Pipa Beton dia 80 cm m1
14 Pemasangan Pipa Beton dia 100 cm m1
15 Pasangan Gorong-Gorong Buis Beton dia.100 cm dg Cincin Batu Bata m1
15 Pasangan Gorong-Gorong Buis Beton dia.40 cm Dg Beton Massa K -125 m1
16 Pasangan Gorong-Gorong Buis Beton dia.50 cm Dg Beton Massa K -125 m1
17 Pasangan Gorong-Gorong Buis Beton dia.60 cm Dg Beton Massa K -125 m1
18 Pasangan Gorong-Gorong Buis Beton dia.80 cm Dg Beton, Menggunakan Buruh m1
Gorong-Gorong Kotak Pasangan Batu dengan Penutup Beton Bertulang Uk.1 M X 1 M,
19 m1
Menggunakan Buruh
NO URAIAN KEGIATAN SATUAN

20 Bracing m
15 Lantai Kerja m3
15 Pembesian dengan Besi Wiremesh M6 kg
16 Pekerjaan Besi untuk Teralis Pagar Kg
F Pekerjaan Dinding dan Plesteran
1 Pemasangan Batu Merah tebal 1 bata (1 SP : 2 PP) m2
2 Pemasangan Batu Merah tebal 1/2bata (1 SP : 2 PP) m2
3 Pemasangan Batu Merah tebal 1 bata (1 SP : 3 PP) m2
1 Pemasangan Batu Merah tebal 1/2 bata (1 SP : 3 PP) m2
2 Pemasangan Batu Merah tebal 1 bata (1 SP : 4 PP) m2
3 Pemasangan Batu Merah tebal 1/2bata (1 SP : 4 PP) m2
2 Pemasangan Batu Merah tebal 1 bata (1 SP : 5 PP) m2
3 Pemasangan Batu Merah tebal 1/2bata (1 SP : 5 PP) m2
4 Pemasangan Batu Merah tebal 1 bata (1 SP : 6 PP) m2
5 Pemasangan Batu Merah tebal 1/2bata (1 SP : 6 PP) m2
6 Pasang Dinding Hollowblock ( HB10 ) Campuran 1SP : 4PP m2
7 Pasang dinding rooster 12x11x24 cm campuran 1 SP : 3PP m2
8 Pasang dinding rooster 12x11x24 cm campuran 1 SP : 4PP m2
9 Plesteran 1 SP : 2 PP tebal 15 mm m2
10 Plesteran 1 SP : 3 PP tebal 15 mm m2
11 Plesteran speci 1 Pc : 3 Ps tebal 15 mm untuk bangunan basah m2
16 Plesteran 1 SP : 4 PP tebal 15 mm m2
4 Plesteran 1 SP : 5 PP tebal 15 mm m2
5 Plesteran 1 SP : 6 PP tebal 15 mm m2
6 Plesteran 1 SP : 2 PP tebal 20 mm m2
7 Plesteran 1 SP : 3 PP tebal 20 mm m2
8 Plesteran 1 SP : 4 PP tebal 20 mm m2
9 Plesteran 1 SP : 5 PP tebal 20 mm m2
10 Plesteran 1 SP : 6 PP tebal 20 mm m2
11 Plesteran Skoning 1 SP : 3 PP Lebar 10 Cm m1
5 Plesteran Benangan Sudut m1
6 Plesteran Ciprat 1 SP : 2 PP m2
7 Plesteran Siar adukan 1 SP : 2 PP untuk pasangan batu kali m2
8 Plesteran Siar adukan 1 Pc : 2 Ps untuk bangunan basah m2
7 Acian m2
8 Pemasangan Batu Merah Kosongan tebal 1 bata m2
G Pekerjaan Lantai
1 Pasang Lantai Keramik Tipe Granit Setara Ex. Granito uk. 40x40 cm (Motif/Warna) m2
NO URAIAN KEGIATAN SATUAN

2 Pasangan plint keramik 10x20 cm m1


1 Pasangan lantai keramik motif 20x20 cm m2
2 Pasangan lantai keramik motif 30x30 cm m2
3 Pasangan lantai keramik Motif 40x40 cm m2
4 Pasangan lantai keramik polos 30x30 cm m2
5 Pasangan lantai keramik polos 40x40 cm m2
6 Pasangan ubin pc abu-abu 20x20 cm m2
6 Pasangan lantai marmer 30 x 60 cm Setara Ex. Tulungagung m2
7 Pasangan lantai marmer 60 x 60 cm Setara Ex. Tulungagung m2
8 Pasangan lantai Parquet jati 2 cm m2
9 Pasangan lantai karpet m2
2 Pasangan Dinding keramik 20x25 cm m2
3 Pasangan Lantai Batu Granit 30x60 cm Setara Ex. Sumedang m2
4 Pasangan Lantai Batu Granit 40x60 cm Setara Ex. Sumedang m2
5 Pasangan Dinding Marmer 30x60 cm Setara Ex. Tulungagung m2
6 Pasangan Dinding Marmer 60x60 cm Setara Ex. Tulungagung m2
3 Pasangan lantai keramik Kasar 40x40 cm m2
4 Pasangan Dinding Batu Granit 30x60 cm Setara Ex. Sumedang m2
5 Pasangan Dinding Batu Granit 40x60 cm Setara Ex. Sumedang m2
16 Pasangan Lantai Keramik Tipe Granit Motif Terang 60/60cm setara ex. Top Gress m2
17 Pasangan Lantai Keramik Tipe Granit Motif Gelap 60/60cm setara ex. Top Gress m2
18 Pasangan Lantai Keramik Tipe Granit Motif Terang 60/60cm setara ex. Granito m2
19 Pasangan Lantai Keramik Tipe Granit Motif Gelap 60/60cm setara ex. Granito m2
20 Pasangan Lantai Keramik Tipe Granit Motif Terang 60/60cm setara ex. Roman m2
21 Pasangan Lantai Keramik Tipe Granit Motif Gelap 60/60cm setara ex. Roman m2
22 Pasangan Dinding Keramik Tipe Granit Motif Terang 60/60cm setara ex. Top Gress m2
23 Pasangan Dinding Keramik Tipe Granit Motif Gelap 60/60cm setara ex. Top Gress m2
24 Pasangan Dinding Keramik Tipe Granit Motif Terang 60/60cm setara ex. Granito m2
25 Pasangan Dinding Keramik Tipe Granit Motif Gelap 60/60cm setara ex. Granito m2
26 Pasangan Dinding Keramik Tipe Granit Motif Terang 60/60cm setara ex. Roman m2
27 Pasangan Dinding Keramik Tipe Granit Motif Gelap 60/60cm setara ex. Roman m2
H Pekerjaaan Rangka Atap
1 Pasangan Kuda-Kuda Kayu Jati (Konvensional) bentang 6m m3
2 Pasangan Kuda-Kuda Kayu Kamper (Konvensional) bentang 6m m3
3 Pasangan Kuda-Kuda Kayu Kruing (Konvensional) bentang 6m m3
4 Pasangan Kuda-Kuda Expose Kayu Jati m3
5 Pasangan Kuda-Kuda Expose Kayu Kamper m3
6 Pasangan Kuda-Kuda Expose Kayu Kruing m3
NO URAIAN KEGIATAN SATUAN

5 Pasangan Gordeng Kayu Jati m3


6 Pasangan Gordeng Kayu Kamper m3
7 Pasangan Gordeng Kayu Kruing m3
8 Pasang kaso + reng (kayu jati) genteng kodok m2
9 Pasang kaso + reng (kayu kamper) genteng kodok m2
10 Pasang kaso + reng (kayu kruing) genteng kodok m2
8 Pasang kaso + reng (kayu jati) genteng beton m2
9 Pasang kaso + reng (kayu kamper) genteng beton m2
10 Pasang kaso + reng (kayu kruing) genteng beton m2
11 Pasang kaso kruing + reng jati genteng kodok m2
12 Pasang kaso kruing + reng jati genteng beton m2
13 Pasang kaso kruing (lama) + reng jati (baru) genteng kodok m2
14 Pasang kaso kruing (lama) + reng jati (baru) genteng beton m2
15 Pasang kaso kruing (lama) + reng kamper (baru) genteng kodok m2
16 Pasang kaso kruing (lama) + reng kamper (baru) genteng beton m2
1 Pasang rangka atap baja ringan profil C75 Setara Ex. Kencana m2
12 Pasang rangka atap jurai baja ringan profil C75 m2
12 Pasang Usuk + Reng Galvalume m2
13 Pasang rangka atap baja ringan profil UK75 m2
14 Pasang Rangka Atap Hollow Flat ( 1 m x 1 m ) m2
15 Pemasangan Pipa Besi Hollow 20/40 m1
16 Pemasangan Pipa Besi Hollow 30/30 m1
17 Pemasangan Pipa Besi Hollow 40/40 m1
18 Pemasangan Pipa Besi Hollow 50/50 m1
19 Pemasangan Pipa Besi Hollow 60/60 m1
20 Pemasangan Pipa Besi Hollow 70/70 m1
I Penutup Atap
1 Pasang atap genteng plam lokal m2
2 Pasang atap genteng kodok ex. Trenggalek m2
3 Pasang Atap Genteng Kaca m2
3 Pasang Atap Genteng Beton Lokal m2
4 Pasang Atap Genteng Beton Setara Ex. Cisangkan m2
1 Pasang Atap Genteng Karang Pilang Type Italy ( Kodokan ) m2
2 Pasang Atap Genteng Keramik m2
6 Pasang Atap Genteng Karang Pilang Type Gemini ( Kecil ) m2
7 Pasang Atap Genteng Karang Pilang Type Grande ( Besar ) m2
8 Pasang Atap Genteng Karang Pilang Type Biber Tile ( Kecil ) m2
8 Pasang Atap Genteng Keramik Glazuur m2
NO URAIAN KEGIATAN SATUAN

9 Pasang Atap Asbes Gelombang Tb.4 mm (3.00 x 1.05) m2


10 Pasang Atap Asbes Gelombang Tb.5 mm (0.92 x 2) m2
11 Pasang Atap Sirap m2
12 Pasang Atap Seng BJLS 30 m2
13 Pasang Atap Seng BJLS 40 m2
14 Pasang Atap Fiber Glass m2
15 Pasang Penutup Atap Zincalum m2
15 Pasang Atap Alumunium m2
16 Pasang Atap Alumunium Setara Ex. RoofTop m2
17 Pasang nok stel gelombang asbes m1
18 Pasang nok stel gelombang seng m1
19 Pasang Nok Genteng Beton lokal m1
20 Pasang Genteng Wuwung Beton Setara Ex. Cisangkan m1
21 Pasang rangka stainless dan atap polycarbonate m2
22 Pasang genteng Wuwung Plam lokal m1
22 Pasang genteng Wuwung ex. Trenggalek m1
2 Pasang genteng Wuwung ex.Karangpilang m1
24 Pasang genteng Wuwung Natural/Mahogani m1
25 Pemasangan Wuwung/Jurai Genteng Galvalume m1
26 Pemasangan Wuwung Asbes 0.92m m1
27 Pemasangan Wuwung Asbes 1.05 m1
28 Pasang Talang dari Seng BJLS 30 (lebar 60cm) m1
28 Pasang Talang dari Seng BJLS 28 (lbr 90cm) m1
29 Pasang Talang dari Seng BJLS 40 (lebar 60 cm) m1
30 Pasang Talang dari Seng BJLS 40 (lbr 90cm) m1
31 Pasang Talang Cerobong Dari Seng BJLS 40/12 cm m1
29 Pasang Listplank Kayu Jati 3/20 cm m1
30 Pasang Listplank Kayu Kamper 3/20 cm m1
31 Pasang Listplank Kayu Jati 3/30 cm m1
32 Pasang Listplank Kayu Kamper 3/30 cm m1
33 Pasang Listplank Kayu Jati 2 x 3/20 cm (dobel) m1
34 Pasang Listplank Kayu kamper 2 x 3/20 cm (dobel) m1
35 Pasang Alluminium Foil t=4mm m2
J Plafon
1 Pasang rangka langit - langit (0.5x1)m kayu jati m2
2 Pasang rangka langit - langit (0.5x1)m kayu kamper m2
3 Pasang rangka langit - langit (0.5x1)m kayu kruing m2
4 Pasang rangka langit - langit (0.6x0.6)m kayu jati m2
NO URAIAN KEGIATAN SATUAN

5 Pasang rangka langit - langit (0.6x0.6)m kayu kamper m2


6 Pasang rangka langit - langit (0.6x0.6)m kayu kruing m2
7 Langit - langit eternit/asbes 1x1 m tebal 3 mm m2
8 Langit - langit Teakwood uk. 120x240, tebal 4 mm m2
9 List langit - langit kayu kamper m1
10 Langit-langit gypsum board, tebal 9 mm m2
11 List langit - langit gypsum m1
12 Pekerjaan Langit-langit Calsiboard tebal 3.5mm m2
1 Pekerjaan Langit-langit Calsiboard tebal 6mm m2
2 Pemasangan Papan Reiuter m1
3 Pemasangan Kompres Atap m1
2 Pemasangan Rangka Plafond Hollow Galvalume 0.6 x 0.6m m2
3 Pemasangan Rangka Plafond Metal Furing (0,6 X 1,2) m2
17 Pasang Kalsiplank Lebar 20 Cm m1
3 Pasang Kalsiplank Lebar 30 Cm m1
4 Pasang Rangka Lisplank Hollow Galvalume m2
5 Pemasangan Rangka Siku m1
20 Pasang Lisplank GRC m2
21 Pasang Rangka Lisplank Metal Furing m2
K Pekerjaan Kusen, Pintu, & Jendela
1 Kusen Pintu / Jendela Kayu Jati m3
2 Kusen Pintu / Jendela Kayu kamper m3
3 Kusen Pintu/Jendela Kayu kruing m3
4 Pasang Pintu Teakwood Rangkap, rangka kayu jati m2
5 Pasang Pintu Teakwood Rangkap, rangka kamper m2
6 Pasang Pintu Taekwood Lapis Aluminium, rangka kamper m2
5 Pasang Pintu Plywood Rangkap, rangka kayu jati m2
6 Pasang Pintu Plywood Rangkap, rangka kamper m2
7 Pasang Daun Pintu klamp kayu jati m2
8 Pasang Daun Pintu klamp kayu kamper m2
9 Pasang Daun Pintu Panel kayu jati m2
10 Pasang Daun Pintu Panel Kayu Kamper m2
11 Pasang Pintu/Jendela Kaca Kayu jati m2
12 Pasang Pintu/Jendela Kaca Kayu kamper m2
13 Pasang Pintu/Jendela Kaca Kayu Kruing m2
14 Pasang Pintu/Jendela Jalusi Kayu jati m2
15 Pasang Pintu/Jendela Jalusi Kayu kamper m2
16 Pasang Jendela Nako dan tralis m2
NO URAIAN KEGIATAN SATUAN

1 Pasang Kaca Mati tebal 5 mm m2


2 Pasang Kaca Mati Rayban tebal 5 mm m2
3 Pasang Kaca Es tebal 5 mm m2
4 Pasang Kaca Mati tebal 8 mm m2
5 Pasang Kaca Mati tebal 10 mm m2
22 Pasang Kaca Tempered tebal 8 mm m2
23 Pasang Kaca Tempered tebal 10 mm m2
24 Pasang Kaca Tempered tebal 12 mm m2
25 Pasang Dinding Sketsel (Double Teakwood) m2
26 Pasang rangka Dinding pemisah kayu kamper m2
27 Pasang Dinding pemisah tripleks rangkap rangka kayu kamper m2
27 Pasang dinding Lambrisering kayu kamper m2
28 Pasang plywood tebal 4 mm untuk dinding m2
28 Pemasangan Kunci Tanam Biasa Buah
29 Pemasangan Kunci Tanam Kamar mandi Buah
30 Pemasangan Kunci Tanam Mortus Cylinder - Basket 50mm Buah
31 Pemasangan Kunci Tanam Pintu Almunium Buah
32 Pemasangan Engsel Pintu Buah
33 Pemasangan Engsel Pintu Solid EK 17 Buah
34 Pemasangan Engsel Jendela Kupu-Kupu Buah
35 Pemasangan Kait Angin Buah
36 Pemasangan Hak Angin Lurus Kuningan Buah
37 Pemasangan Engsel Hidrolis Pintu Almunium Buah
38 Pemasangan Grendel Biasa (Besar) Buah
39 Pemasangan Grendel Biasa (Kecil) Buah
40 Pemasangan Grendel Tanam Buah
41 Pemasangan Door Holder Buah
42 Pemasangan Door Stoper Buah
43 Pemasangan Door Kloser Buah
44 Pemasangan Handle Pintu Pasang
45 Pemasangan Rel Pintu Dorong Buah
46 Pemasangan Fitrase ex. Corais & aquirlda m2
46 Pemasangan Vertical Blind ex. Shin ichi m2
47 Pemasangan Lapisan Foam untuk Karpet m2
48 Pemasangan Karpet Wool ex. Aloha m2
49 Pemasangan Kawat Nyamuk (Kassa Plastik) m2
50 Pemasangan Kawat Nyamuk (Kassa Aluminium) m2
51 Pemasangan Kawat Harmonika m2
NO URAIAN KEGIATAN SATUAN

2 Pemasangan Kusen Alumunium Profil 4" Putih m1


3 Pemasangan Kusen Alumunium Profil 4" Warna ( Coklat ) m1
49 Pemasangan Kusen WPC m1
50 Pemasangan Slimar Alumunium Profil 3/8" Dg Kaca Rayben 5 mm m2
51 Pemasangan Rolling Door Alumunium m2
52 Pemasangan Rolling Door Seng m2
53 Pemasangan Pintu Besi Motif m2
54 Pemasangan Pintu Besi Lipat biasa m2
55 Pemasangan Pintu Kaca Tb.12 mm Rangka Aluminium m2
56 Pemasangan Pintu Harmonika Lebar Sayap 20 Cm m2
57 Pemasangan Pintu HPL lebar 80-90 cm buah
58 Pemasangan Pintu HPL lebar 70 cm buah
56 Pemasangan Pintu HPL Buah
57 Pemasangan Pintu WPC Buah
NO URAIAN KEGIATAN SATUAN

L Sanitair
1 Pemasangan Dasar Saluran R.25 Segmen m1
2 Pemasangan Dasar Saluran R.15 Segmen m1
3 Pemasangan Dasar Saluran R.10 Segmen m1
4 Pemasangan Dasar Saluran R.25 (1/2 lingkaran) m1
5 Pemasangan Dasar Saluran R.15 (1/2 lingkaran) m1
6 Pemasangan Dasar Saluran R.10 (1/2 lingkaran) m1
1 Pemasangan Kran Air Model Engkol Buah
2 Pemasangan Kloset Jongkok Porselen Buah
2 Pemasangan Kloset Duduk ex. INA komplit Buah
3 Pemasangan Wastafel Bahan Keramik Buah
4 Pemasangan Wastafel ex. TOTO Buah
5 Pemasangan Urinoir Buah
6 Pemasangan Bak Mandi Batu Bata Volume 0.3 m3 Buah
13 Memasang Bak Kontrol Pasangan Batu bata uk 30x30 cm, Tinggi 35 cm Buah
14 Memasang Bak Kontrol Pasangan Batu bata uk 45x45 cm, Tinggi 50 cm Buah
15 Pemasangan Bak cuci piring stainless steel dan accessories Buah
4 Pemasangan Floor Drain Buah
5 Pemasangan Kran Bebek Fio 10 JC Buah
M Pagar
1 Pemasangan Pagar Model BRC/PMG A m2
2 Pasang Tiang Pagar Model PMG 2" m1
3 Pasang Daun Pintu Swing Ganda Type BRC/PMG ukuran. (1,2 x 3) meter Unit
4 Pasang Daun Pintu Dorong Type BRC/PMG ukuran. (1,2 x 3) meter Unit
1 Pemasangan Pagar Besi Pipa HOLLO m2
N Pipa
1 Pemasangan Pipa Stainless Termasuk Elektrode m1
1 Pekerjaan Besi Pipa Stainless 5/8 " m1
2 Pekerjaan Besi Pipa Stainless 1.25 " m1
3 Pekerjaan Besi Pipa Stainless 1.5 " m1
1 Pekerjaan Besi Pipa Stainless 2 " m1
6 Pemasangan Pipa Galvanis Termasuk Elektrode m1
5 Pemasangan Pipa Galvanis Diameter 3/4 " m1
6 Pemasangan Pipa Galvanis Diameter 1 " m1
7 Pemasangan Pipa Galvanis Diameter 1,5 " m1
8 Pemasangan Pipa Galvanis Diameter 3 " m1
9 Pemasangan Pipa Galvanis Diameter 4 " m1
10 Pengadaan dan Pemasangan Pipa GI Dia. 3/4" m1
NO URAIAN KEGIATAN SATUAN

11 Pengadaan dan Pemasangan Pipa GI Dia. 1" m1


12 Pengadaan dan Pemasangan Pipa GI Dia.1,5" m1
13 Pengadaan dan Pemasangan Pipa GI Dia. 2" m1
14 Pengadaan dan Pemasangan Pipa GI Dia. 3" m1
15 Pengadaan & Pemasangan Pipa GI Dia. 4" m1
16 Pengadaan & Pemasangan Pipa GI Dia. 6" m1
Pengg. Pemasangan, Penyambungan & Pengetesan Kebocoran Pipa Galvanis Dia 6" u/
17 m1
saluran Bangunan Air
18 Pipa Besi untuk Riser / Stand Pipe Dia 6 " m1
17 Pemasangan Sandaran Pipa Besi Galvanis Dia. 2" m1
18 Pemasangan Sandaran Pipa Besi Galvanis Dia. 3" m1
2 Pasang Pipa PVC Type AW dia. 3/4" m1
3 Pasang Pipa PVC Type AW dia. 1" m1
12 Pasang Pipa PVC Type AW dia. 1,25" m1
13 Pasang Pipa PVC Type AW dia. 1,5" m1
14 Pasang Pipa PVC Type AW dia. 2" m1
15 Pasang Pipa PVC Type AW dia. 3" m1
16 Pasang Pipa PVC Type AW dia. 4" m1
17 Pemasangan Pipa PVC 3" Type AW untuk Talang Pembuluh m1
18 Pemasangan Pipa PVC 4" Type AW untuk Talang Pembuluh m1
19 Pemasangan Pipa PVC 5" Type AW untuk Talang Pembuluh m1
4 Pemasangan Pipa PVC 3" Type D untuk Talang Pembuluh m1
5 Pemasangan Pipa PVC 4" Type D untuk Talang Pembuluh m1
19 Pemasangan Pipa PVC 5" Type D untuk Talang Pembuluh m1
20 Pengg. Pemasangan, Penyambungan dan Pengetesan Kebocoran Pipa PVC Dia 12 " m1
21 Pengg. Pemasangan, Penyambungan dan Pengetesan Kebocoran Pipa PVC Dia 8 " m1
22 Pengg. Pemasangan, Penyambungan dan Pengetesan Kebocoran Pipa PVC Dia 6 " m1
18 Pengadaan dan Pemasangan Pipa PVC S-12,5 Dia. 1" P. 6 m m1
19 Pengadaan dan Pemasangan Pipa PVC S-12,5 Dia. 2" P. 6 m m1
20 Pengadaan dan Pemasangan Pipa PVC S-12,5 Dia. 3" P. 6 m m1
21 Pengadaan dan Pemasangan Pipa PVC S-12,5 Dia. 4" P. 6 m m1
22 Pengadaan dan Pemasangan Pipa PVC S-12,5 Dia. 6" P. 6 m m1
20 Pemasangan Biopori dia. 25cm tinggi 1m Titik
O Pengecatan
1 Membersihkan permukaan cat tembok lama m2
2 Mengerok Karat Cat Lama Permukaan Baja secara Manual m2
3 Mengerok Cat Lama Permukaan Kayu secara Manual m2
4 Mendempul dan menggosok kayu m2
4 Pengecatan Bidang Kayu Lama m2
NO URAIAN KEGIATAN SATUAN

1 Pengecatan Bidang Kayu Baru 2 Lapis m2


6 Pekerjaan Pelituran m2
7 Pelaburan Bidang Kayu Dengan Cat Residu & Ter m2
8 Mengapur dinding tembok baru sampai baik 3x m2
9 Mengapur dinding tembok lama sampai baik 3x m2
2 Pengecatan Tembok dalam Baru 2 Lapis (Interior Standar) m2
3 Pengecatan Tembok dalam Baru 2 Lapis (Interior Khusus) m2
3 Pengecatan Tembok luar Baru 2 Lapis (Eksterior) m2
4 Pengecatan Tembok Lama 2 Lapis m2
5 Pekerjaan Plituran melamic m2
6 Pengecatan Permukaan Baja dengan Meni Besi m2
7 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah m2
8 Pengecatan Permukaan Baja galvanis scr manual sistem 1 lapis cat mutakhir m2
9 Pengecatan Plafond m2
17 Pengecatan Genteng m2
18 Pelapisan Waterproofing m2
P Finishing Dinding
1 Pemasangan Batu Palimanan/ Kuning + Finishing m2
2 Pemasangan Batu Palimanan/ Hijau + Finishing m2
3 Pemasangan Batu Candi + Finishing m2
4 Pemasangan Batu Ampyang + Finishing m2
5 Pemasangan Batu Gilang Ex Jember (Simetris) + Finishing m2
6 Pemasangan Batu Gilang Ex Jember (random) + Finishing m2
5 Pemasangan Batu Andesit 20 x 40 + Finishing m2
1 Pemasangan Batu Susun Sirih + Finishing m2
2 Pemasangan Wall Paper lebar 50 cm m2
8 Pemasangan Pintu HPL m2
Q Instalasi Listrik
1 Pemasangan Titik Stop Kontak Gedung Titik
2 Pemasangan Titik Lampu Titik
3 Pemasangan MCB Buah
3 Pemasangan Saklar Tunggal Titik
4 Pemasangan Saklar Ganda Titik
5 Pemasangan Lampu TL 2x40 Watt Buah
6 Pemasangan Lampu TL 1x20 Watt Buah
7 Pemasangan Lampu SL 18 Watt Buah
8 Pemasangan Lampu Pijar 25 Watt Buah
9 Pemasangan Lampu Baret Son Natrium Buah
NO URAIAN KEGIATAN SATUAN

10 Pekerjaan Pemolesan Lantai pada Teraso atau Marmer m2


11 Pemasangan Lampu SL 23 Watt Buah
12 Pemasangan Lampu RM 2 x 18 Watt Setara Ex. Fatro Unit
13 Pemasangan Lampu RM 2 x 36 Watt Setara Ex. Fatro Unit
14 Pemasangan Lampu RM 2 x 18 Watt Setara Ex. Artolite Unit
15 Pemasangan Lampu RM 2 x 36 Watt Setara Ex. Artolite Unit
16 Pemasangan Lampu Baret / Kotak Unit
17 Pemasangan Kabel Trey m1
18 Pemasangan Lampu Downlight Tanam 6" setara ex. Artolite Unit
19 Pemasangan Lampu Downlight Expose 6" setara ex. Artolite Unit
R Perkerasan Paving
1 Pemasangan Tegel Trotoar m2
1 Pemasangan Paving Stone (Blok) Tbl.8 cm ( Lokal Kw 1) + Pasir Urug tbl 10cm m2
1 Pemasangan Paving Stone (Blok) Tbl.6 cm ( Lokal Kw 1) + Pasir Urug tbl 5cm m2
2019
UPATEN MADIUN
ANALISA
(%)
2019

Rp 390,203.67
Rp 4,029,931.26
Rp 4,703,131.26
Rp 5,914,577.51
Rp 8,534,777.51
Rp 10,005,477.51
Rp 11,596,471.94
Rp 1,550,531.26
Rp 2,186,331.26
Rp 3,226,931.26
Rp 4,466,977.51

Rp 52,669.98
Rp 720,303.60

Rp 106,714.67
Rp 310,968.36
Rp 180,490.97
Rp 1,136,475.34
Rp 277,735.55
Rp 443,147.38
Rp 8,745.55
Rp 108,991.92
Rp 173,784.19
Rp 210,958.89
Rp 285,308.28
Rp 523,633.51
ANALISA
(%)
2019

Rp 566,111.50
Rp 521,474.54
Rp 2,130,230.24
Rp 543,295.29
Rp 614,152.48

Rp 13,588.11
Rp 14,173.83
Rp 30,246.88
Rp 43,389.38
Rp 77,049.48
Rp 1,612,983.30
Rp 1,612,983.30
Rp 1,512,416.66
Rp 1,512,416.66
Rp 1,459,568.88
Rp 1,459,568.88
Rp 1,861,479.79

Rp 3,048,232.79
Rp 2,238,779.48
Rp 2,187,833.48
Rp 1,397,902.78
Rp 1,051,828.98
Rp 1,180,569.31
Rp 432,879.90
Rp 695,574.54

Rp 22,280.34
Rp 187,912.39
Rp 140,186.14
Rp 238,644.11
Rp 510,912.17
Rp 299,893.67
ANALISA
(%)
2019
Rp 4,500.00
Rp 6,295.85
Rp 16,500.00
Rp 2,806.10
Rp 76,368.70
Rp 57,376.09
Rp 20,127.87
Rp 46,447.50
Rp 55,687.50
Rp 63,758.75
Rp 67,058.75
Rp 70,358.75
Rp 8,194.19
Rp 10,631.13
Rp 111,457.50
Rp 123,750.00
Rp 149,496.88
Rp 155,271.88
Rp 159,396.88
Rp 103,125.00
Rp 114,840.00
Rp 140,421.88
Rp 148,671.88
Rp 159,396.88
Rp 68,475.00
Rp 82,500.00
Rp 47,610.75
Rp 60,201.90
Rp 65,126.60
Rp 278,685.00
Rp 309,375.00
Rp 135,176.25
Rp 151,676.25
Rp 161,576.25
Rp 27,225.00
Rp 35,849.00
Rp 431,640.00
Rp 25,498.00
ANALISA
(%)
2019
Rp 19,096.00
Rp 20,944.00
Rp 27,412.00
Rp 32,494.00
Rp 46,200.00
Rp 108,036.50
Rp 234,602.83

Rp 1,075,430.40
Rp 875,032.40
Rp 1,136,799.40

Rp 952,197.40

Rp 118,370.60
Rp 941,902.50
Rp 959,288.00
Rp 933,005.70
Rp 950,391.20
Rp 143,433.21
Rp 54,063.42
Rp 53,160.05
Rp 53,259.05
Rp 70,325.03
Rp 66,442.68
Rp 35,375.38
Rp 321,827.00

Rp 1,077,712.35

Rp 1,095,791.68

Rp 1,588,743.75
ANALISA
(%)
2019

Rp 1,991,098.23

Rp 1,608,553.76

Rp 2,230,662.50

Rp 2,158,719.04

Rp 2,159,106.35

Rp 2,976,330.50

Rp 677,836.50

Rp 701,679.94

Rp 987,421.05

Rp 973,267.85

Rp 1,228,562.39
ANALISA
(%)
2019

Rp 1,762,897.95

Rp 1,283,594.73

Rp 1,307,614.39

Rp 1,864,909.20

Rp 552,260.50

Rp 2,180,160.07

Rp 1,843,983.68

Rp 1,889,359.51

Rp 2,111,641.35

Rp 2,138,774.00

Rp 2,670,845.32

Rp 556,385.50
Rp 48,130.78
Rp 414,953.00
Rp 1,031.25
ANALISA
(%)
2019
Rp 491.87
Rp 31,281.25
Rp 37,950.00
Rp 351,143.10
Rp 866,105.90
Rp 75,634.90
Rp 42,568.35

Rp 17,846.95

Rp 817,139.29
Rp 825,214.06
Rp 838,746.81
Rp 920,455.75
Rp 1,026,152.00
Rp 964,706.42
Rp 1,070,182.67
Rp 988,774.19
Rp 1,094,470.44
Rp 1,017,475.33
Rp 1,123,171.58
Rp 1,044,593.27
Rp 1,150,289.52
Rp 1,065,460.52
Rp 1,171,156.77
Rp 1,064,007.38
Rp 1,169,703.63
Rp 1,087,055.41
Rp 1,192,751.66
Rp 1,094,090.26
Rp 1,199,786.51
Rp 1,166,378.09
Rp 1,308,539.34
Rp 1,175,701.26
Rp 1,317,862.51
Rp 1,407,600.70

Rp 33,825.00
ANALISA
(%)
2019

Rp 41,250.00

Rp 416,638.20
Rp 56,555.40
Rp 41,250.00
Rp 1,379,372.50
Rp 13,793.73
Rp 1,437,122.50
Rp 14,371.23
Rp 1,584,390.50
Rp 15,843.91
Rp 1,642,140.50
Rp 16,421.41
Rp 127,601.43
Rp 83,289.25
Rp 120,323.50
Rp 164,020.45
Rp 122,213.41
Rp 181,324.00
Rp 124,849.56
Rp 120,323.50
Rp 118,757.21
Rp 98,852.71
Rp 181,324.00
Rp 131,560.22
Rp 143,586.63
Rp 116,012.71
Rp 96,108.21
Rp 181,324.00
Rp 145,075.59
Rp 89,126.95
Rp 140,406.42
Rp 112,832.50
Rp 107,511.14
Rp 155,871.76
Rp 114,749.69
Rp 3,300.00
Rp 4,950.00
ANALISA
(%)
2019
Rp 331,517.01
Rp 327,043.75
Rp 7,382.10
Rp 235,350.82
Rp 36,299.45
Rp 43,560.00
Rp 166,639.00
Rp 16,663.90
Rp 172,414.00
Rp 17,241.40
Rp 3,039,748.25
Rp 82,412.72
Rp 102,794.89

Rp 50,448.75
Rp 162,573.99
Rp 141,035.13
Rp 182,394.49
Rp 244,745.70
Rp 284,073.45
Rp 353,805.93
Rp 438,058.21
Rp 808,869.93
Rp 91,410.00
Rp 91,410.00
Rp 280,709.92
Rp 376,345.75
Rp 25,696.00
Rp 48,864.75
Rp 65,659.00
Rp 115,440.88
Rp 158,406.88
Rp 313,442.25
Rp 33,093.50
Rp 38,847.88
Rp 74,094.63
Rp 95,449.75
ANALISA
(%)
2019
Rp 174,783.13
Rp 2,695,440.00
Rp 8,806,820.70
Rp 11,820.05
Rp 1,353,250.25
Rp 2,001,505.00
Rp 177,320.00
Rp 1,189,787.50

Rp 464,668.95
Rp 162,569.00
Rp 1,726,210.75
Rp -
Rp 9,963.36
Rp 19,501.13
Rp 30,015.59
Rp 28,967.62
Rp 47,872.17
Rp 46,665.41
Rp 74,363.03
Rp 29,577.79
Rp 49,002.09
Rp 47,935.42
Rp 76,306.45
Rp 75,036.45
Rp 121,561.77
Rp 91,318,213.71
Rp 37,948,215.16
Rp 20,412,330.94
Rp 9,070,741.55

Rp ###
260,204.89
Rp ###
127,987.81
Rp ###
139,128.50
Rp ###
376,640.00
Rp ###
31,900.00
ANALISA
(%)
2019
Rp ###
13,200.00
###
Rp 1,909,026.90
Rp ###
9,900.00
Rp ###
19,800.00
Rp ###
549,989.00
Rp ###
22,000.00
###
Rp 1,099,978.00
Rp ###
22,000.00
Rp ###
87,940.55
Rp ###
63,246.21
Rp ###
38,551.87
Rp ###
42,763.78
Rp ###
32,065.00
###
Rp ###
60,500.00
Rp ###
74,250.00
Rp ###
80,520.00
Rp ###
122,100.00
Rp ###
97,350.00
Rp ###
110,440.00
Rp ###
26,510.00
Rp ###
45,232.00
Rp ###
96,250.00
Rp ###
409,750.00
Rp ###
2,750.00
Rp ###
12,375.00
Rp ###
20,625.00
Rp ###
44,000.00
Rp ###
30,250.00
Rp ###
121,000.00
Rp ###
201,278.00
Rp ###
299,200.00
Rp ###
355,894.00
Rp ###
58,756.50
Rp ###
128,348.00
Rp ###
123,898.12
Rp ###
59,519.57
Rp ###
57,068.00
Rp ###
24,112.00
Rp ###
119,030.32
ANALISA
(%)
2019
Rp ###
151,216.01
Rp ###
325,516.13
Rp ###
38,170.00
Rp ###
297,230.32
Rp ###
4,400.00
Rp ###
53,985.80
Rp ###
26,774.00
Rp ###
55,077.00
Rp ###
334,644.42
Rp ###
465,123.08
Rp ###
436,886.51
Rp ###
75,349.67
Rp ###
119,834.00
Rp ###
39,049.40
Rp ###
46,860.00
Rp ###
74,250.00
Rp ###
3,382.62
Rp ###
137,264.23
Rp ###
13,037.75
Rp ###
181,436.64
Rp ###
73,128.00
Rp ###
477,674.94
Rp ###
23,386.29
Rp ###
140,272.00
###
Rp ###
965,100.40
Rp ###
844,789.00
Rp ###
846,692.00
Rp ###
806,610.75
Rp ###
753,746.08
Rp ###
778,783.50
Rp ###
759,239.25
Rp ###
732,404.75
Rp ###
376,835.58
Rp ###
2,333,961.30
Rp ###
1,040,625.33
Rp ###
157,556.55
Rp ###
374,222.48
Rp ###
348,152.48
ANALISA
(%)
2019
Rp ###
292,858.13
Rp ###
127,173.75
###
Rp ###
185,810.35
Rp ###
239,511.80
Rp ###
158,365.90
Rp ###
259,798.28
Rp ###
168,509.14
Rp ###
387,984.30
Rp ###
243,395.90
Rp ###
396,894.30
Rp ###
247,850.90
Rp ###
479,504.30
Rp ###
289,155.90
Rp ###
347,095.10
Rp ###
222,793.18
Rp ###
364,224.30
Rp ###
259,798.28
Rp ###
198,938.85
Rp ###
138,079.43
Rp ###
13,253.90
Rp ###
14,582.15
Rp ###
936,982.12
Rp ###
968,353.84
Rp ###
992,997.05
Rp ###
878,834.09
Rp ###
1,021,982.31
Rp ###
1,050,008.45
Rp ###
1,070,609.56
Rp ###
1,084,838.02
Rp ###
1,109,552.56
Rp ###
1,117,127.56
Rp ###
1,191,260.66
Rp ###
1,201,297.05
Rp ###
1,100,082.50
Rp ###
1,122,522.50
Rp ###
1,144,962.50
Rp ###
1,167,402.50
Rp ###
1,201,062.50
ANALISA
(%)
2019
###
Rp 1,257,162.50
###
Rp 1,313,262.50
###
Rp 1,369,362.50
###
Rp 1,436,682.50
Err:509 ###
###
Rp 4,208,016.45
###
Rp 2,924,444.60
###
Rp 5,192,941.60
Rp ###
81,666.15
Rp ###
103,251.89
###
Rp 5,616,970.84
###
Rp 6,565,238.35
###
Rp 5,724,457.75
###
Rp 5,959,883.60
Rp ###
231,000.00
###
Rp ###
956.62
Rp ###
33,591.25
Rp ###
33,591.25
Rp ###
27,519.25
Rp ###
28,215.00
Rp ###
27,962.00
Rp ###
27,645.75
###
#REF!
###
#REF!
Rp ###
119,402.36
Rp ###
203,566.11
Rp ###
220,891.11
Rp ###
238,326.11
Rp ###
261,536.11
Rp ###
400,631.11
Rp ###
505,021.11
Rp ###
850,024.60
###
#REF!
###
#REF!
###
#REF!
Rp ###
1,185,109.44
Rp ###
5,035,641.57
ANALISA
(%)
2019
Rp ###
128,056.12
Rp ###
849,968.76
Rp ###
14,368.21
Rp ###
24,230.25
###
Rp ###
272,188.13
Rp ###
131,677.56
Rp ###
261,868.06
Rp ###
126,250.99
Rp ###
254,014.06
Rp ###
123,446.13
Rp ###
251,281.25
Rp ###
121,700.70
Rp ###
253,166.38
Rp ###
121,250.80
Rp ###
246,056.39
Rp ###
341,151.25
Rp ###
557,301.25
Rp ###
61,623.76
Rp ###
59,381.74
Rp ###
69,581.82
Rp ###
57,674.10
Rp ###
56,947.66
Rp ###
56,264.34
Rp ###
82,498.68
Rp ###
67,739.32
Rp ###
77,118.80
Rp ###
76,263.88
Rp ###
75,239.12
Rp ###
55,479.88
Rp ###
10,472.69
Rp ###
43,502.80
Rp ###
53,715.48
Rp ###
52,777.40
Rp ###
31,779.69
Rp ###
160,193.00
###
Rp ###
403,535.83
ANALISA
(%)
2019
Rp ###
50,899.82
Rp ###
140,955.38
Rp ###
133,491.88
Rp ###
144,775.13
Rp ###
116,315.38
Rp ###
122,205.88
Rp ###
104,697.12
Rp ###
384,854.64
Rp ###
431,494.64
Rp ###
591,309.13
Rp ###
32,686.50
Rp ###
147,557.85
Rp ###
414,004.64
Rp ###
443,154.64
Rp ###
548,218.14
Rp ###
594,858.14
Rp ###
146,716.63
Rp ###
495,876.29
Rp ###
525,026.29
Rp ###
223,447.13
Rp ###
264,257.13
Rp ###
346,460.13
Rp ###
436,125.53
Rp ###
268,687.93
Rp ###
356,137.93
Rp ###
228,011.85
Rp ###
268,821.85
Rp ###
351,024.85
Rp ###
440,690.25
Rp ###
273,252.65
Rp ###
360,702.65
###
###
Rp 23,740,832.50
###
Rp 14,049,761.00
###
Rp 10,556,975.00
###
Rp 23,684,056.00
###
Rp 16,259,056.00
###
Rp 12,448,744.00
ANALISA
(%)
2019
###
Rp 21,919,975.00
###
Rp 15,113,725.00
###
Rp 11,620,939.00
Rp ###
278,437.06
Rp ###
185,045.61
Rp ###
134,666.20
Rp ###
194,719.25
Rp ###
197,380.93
Rp ###
171,991.08
Rp ###
176,846.34
Rp ###
184,524.20
Rp ###
71,357.88
Rp ###
99,243.62
Rp ###
56,939.12
Rp ###
76,413.93
Rp ###
218,726.75
Rp ###
214,559.40
Rp ###
135,321.30
Rp ###
311,539.25
Rp ###
283,254.95
Rp ###
41,132.67
Rp ###
47,526.42
Rp ###
58,751.00
Rp ###
70,259.75
Rp ###
106,491.00
Rp ###
88,020.17
###
Rp ###
57,763.75
Rp ###
78,441.00
Rp ###
20,691.00
Rp ###
94,518.05
Rp ###
214,225.00
Rp ###
151,316.00
Rp ###
174,691.00
Rp ###
159,291.00
Rp ###
169,191.00
Rp ###
153,791.00
Rp ###
202,191.00
ANALISA
(%)
2019
Rp ###
49,085.30
Rp ###
70,909.30
Rp ###
143,511.50
Rp ###
71,870.70
Rp ###
124,384.70
Rp ###
66,734.25
Rp ###
187,453.20
Rp ###
155,228.70
Rp 278,278.46
Rp ###
74,431.50
Rp ###
59,306.50
Rp ###
137,645.75
Rp ###
189,840.75
Rp ###
850,989.70
Rp ###
77,522.06
Rp ###
112,497.00
Rp ###
156,222.00
Rp ###
182,072.00
Rp ###
217,233.50
Rp ###
119,113.50
Rp ###
142,741.50
Rp ###
190,732.54
Rp ###
227,066.84
Rp ###
217,876.85
Rp ###
241,383.85
Rp ###
121,385.00
Rp ###
245,832.20
Rp ###
147,979.02
Rp ###
248,922.47
Rp ###
149,257.19
Rp ###
313,373.82
Rp ###
199,211.77
Rp ###
45,430.00
###
Rp ###
201,297.80
Rp ###
189,185.70
Rp ###
172,159.31
Rp ###
207,353.85
ANALISA
(%)
2019
Rp ###
194,533.90
Rp ###
176,512.46
Rp ###
31,830.15
Rp ###
74,602.00
Rp ###
18,467.35
Rp ###
45,985.50
Rp ###
31,317.00
Rp ###
39,739.26
Rp ###
55,995.50
Rp ###
39,315.54
Rp ###
49,018.42
Rp ###
121,704.52
###
#REF!
Rp ###
37,779.50
Rp ###
48,295.50
Rp ###
122,725.19
Rp ###
106,984.25
Rp ###
643,665.00
Rp ###
425,983.93
###
###
Rp 21,819,778.75
###
Rp 15,702,678.75
###
Rp 11,892,366.75
Rp ###
975,270.18
Rp ###
654,045.70
Rp ###
615,204.70
Rp ###
955,553.21
Rp ###
676,070.18
Rp ###
937,126.85
Rp ###
574,707.65
Rp 1,211,145.10###
Rp ###
848,725.90
Rp ###
961,317.06
Rp ###
743,865.54
Rp ###
694,534.50
Rp 1,686,586.66###
Rp 1,106,715.94###
Rp ###
290,950.00
ANALISA
(%)
2019
Rp ###
170,717.25
Rp ###
164,914.75
Rp ###
190,203.75
Rp ###
215,667.65
Rp ###
299,883.65
Rp ###
795,257.65
Rp ###
946,507.65
###
Rp 1,373,373.65
Rp ###
527,253.65
Rp ###
372,297.75
Rp ###
595,166.00
Rp ###
336,253.50
Rp ###
55,695.75
Rp ###
143,000.00
Rp ###
109,890.00
Rp ###
289,080.00
Rp ###
497,255.00
Rp ###
30,140.00
Rp ###
54,285.00
Rp ###
22,770.00
Rp ###
49,555.00
Rp ###
68,145.00
Rp ###
876,793.50
Rp ###
22,550.00
Rp ###
17,930.00
Rp ###
82,555.00
Rp ###
158,620.00
Rp ###
151,415.00
Rp ###
263,835.00
Rp ###
193,545.00
Rp ###
244,530.00
Rp ###
39,160.00
Rp ###
233,392.50
Rp ###
8,360.00
Rp ###
14,850.00
Rp ###
63,779.87
Rp ###
166,145.87
Rp ###
52,081.70
ANALISA
(%)
2019
Rp ###
154,941.05
Rp ###
140,058.05
Rp ###
142,841.05
Rp ###
539,525.25
Rp ###
974,462.50
Rp ###
590,493.75
Rp ###
688,352.50
Rp ###
549,257.50
Rp ###
952,403.65
Rp ###
201,492.50
###
Rp 2,156,462.00
###
Rp 2,024,792.00
###
Rp 1,599,345.00
###
Rp 1,893,045.00
ANALISA
(%)
2019
###
Rp ###
136,785.00
Rp ###
102,025.00
Rp ###
78,430.00
Rp ###
99,220.00
Rp ###
71,775.00
Rp ###
52,800.00
Rp ###
127,688.00
Rp ###
444,097.50
###
Rp 2,130,645.00
Rp ###
727,202.30
Rp ###
727,202.30
###
Rp 1,611,912.50
###
Rp 1,533,119.50
Rp ###
419,514.15
Rp ###
632,936.15
Rp ###
311,795.00
Rp ###
78,265.00
Rp ###
241,120.00
###
Rp ###
224,331.00
Rp ###
226,985.00
Rp ###
184,800.00
Rp ###
184,800.00
Rp ###
432,611.93
###
Rp ###
10,527.17
Rp ###
66,526.33
Rp ###
80,981.60
Rp ###
109,099.03
Rp ###
153,892.25
Rp ###
10,552.91
Rp ###
74,706.96
Rp ###
105,482.21
Rp ###
162,778.92
Rp ###
337,571.67
Rp ###
472,664.50
Rp ###
74,706.96
ANALISA
(%)
2019
Rp ###
105,482.21
Rp ###
186,494.00
Rp ###
211,659.25
Rp ###
330,339.17
Rp ###
472,590.25
Rp ###
873,430.25
Rp ###
558,947.95
Rp ###
570,717.95
Rp ###
119,111.80
Rp ###
203,828.26
Rp ###
23,049.81
Rp ###
29,217.65
Rp ###
37,384.60
Rp ###
45,790.25
Rp ###
68,131.25
Rp ###
119,967.65
Rp ###
165,064.90
Rp ###
76,953.58
Rp ###
106,339.53
Rp ###
153,218.18
Rp ###
49,852.00
Rp ###
64,317.00
Rp ###
96,030.00
Rp ###
641,256.91
Rp ###
338,697.51
Rp ###
227,348.25
Rp ###
25,970.21
Rp ###
42,672.67
Rp ###
75,746.00
Rp ###
111,525.33
Rp ###
213,458.67
Rp ###
59,998.44
###
Rp ###
12,823.25
Rp ###
14,113.00
Rp ###
12,936.00
Rp ###
16,755.20
Rp ###
43,628.75
ANALISA
(%)
2019
Rp ###
37,574.90
Rp ###
46,181.74
Rp ###
14,397.90
Rp ###
4,900.50
Rp ###
2,219.80
Rp ###
22,418.44
Rp ###
53,838.99
Rp ###
53,552.99
Rp ###
12,137.62
Rp ###
206,180.15
Rp ###
27,070.45
Rp ###
55,501.60
Rp ###
32,866.90
Rp ###
22,418.44
Rp ###
24,882.28
Rp ###
55,022.00
###
Rp ###
390,100.56
Rp ###
382,477.56
Rp ###
382,961.56
Rp ###
312,842.06
Rp ###
224,169.94
Rp ###
226,589.94
Rp ###
432,874.06
Rp ###
424,404.06
Rp ###
76,837.75
###
Rp 1,566,620.00
###
Rp ###
254,226.50
Rp ###
428,946.10
Rp ###
518,596.10
Rp ###
15,922.50
Rp ###
20,542.50
Rp ###
136,097.50
Rp ###
98,147.50
Rp ###
43,752.50
Rp ###
9,762.50
Rp ###
438,762.50
ANALISA
(%)
2019
Rp ###
8,311.19
Rp ###
50,022.50
Rp ###
339,735.00
Rp ###
402,985.00
Rp ###
497,860.00
Rp ###
755,590.00
Rp ###
275,522.50
Rp ###
298,067.00
Rp ###
365,200.00
Rp ###
238,810.00
###
Rp ###
112,483.69
Rp ###
182,007.65
Rp ###
161,670.58
XIII. BIAYA JASA PENUNJANG OPERASIONAL KEGIATAN

KODE
NO NAMA BARANG MERK / UKURAN SATUAN
BARANG
1 2 3 4 5
22 BIAYA UPAH PENUNJANG KEGIATAN
22.01 BIAYA JASA NON PNS
22.01.01 JASA KONSTRUKSI
22.01.01.01 Kepala Tukang
1 22.01.01.01.01 Kepala Tukang Batu O.H
2 22.01.01.01.02 Kepala Tukang Besi O.H
3 22.01.01.01.03 Kepala Tukang Cat O.H
4 22.01.01.01.04 Kepala Tukang Gali Tanah O.H
5 22.01.01.01.05 Kepala Tukang Kayu O.H
6 22.01.01.01.06 Kepala Tukang Listrik O.H
7 22.01.01.01.07 Kepala Tukang Pipa O.H
8 22.01.01.01.08 Kepala Tukang Sapu O.H
9 22.01.01.01.09 Mandor O.H
10 Kepala Tukang Taman O.H
11 Kepala Tukang Las O.H
12 Kepala Tukang Cat Mobil O.H
22.01.01.02 Tukang
1 22.01.01.02.01 Tukang Batu OH
2 22.01.01.02.02 Tukang Besi OH
3 22.01.01.02.03 Tukang Cat OH
4 22.01.01.02.04 Tukang Cat Mobil OH
5 22.01.01.02.05 Tukang Gali Jalan OH
6 22.01.01.02.06 Tukang Gali Lumpur OH
7 22.01.01.02.07 Tukang Gali Tanah OH
8 22.01.01.02.08 Tukang Kayu OH
9 22.01.01.02.09 Tukang Las OH
10 22.01.01.02.10 Tukang Listrik OH
11 22.01.01.02.11 Tukang Pipa OH
12 22.01.01.02.12 Tukang Plitur OH
13 22.01.01.02.13 Tukang Potong Pohon OH
14 22.01.01.02.14 Tukang Sapu OH
15 22.01.01.02.15 Tukang Tanam OH
16 22.01.01.02.16 Tukang Poles OH
Tukang Taman OH
Tukang Potong Rumput OH
22.01.01.03 Pekerja Terampil/ Pembantu Tukang
1 22.01.01.03.01 Colter/Kalibrasi O.H
2 22.01.01.03.02 Juru Ukur OH
3 22.01.01.03.03 Mekanik mesin OH
4 22.01.01.03.04 Mekanik Pembantu OH
5 22.01.01.03.05 Pembantu Operator OH
6 22.01.01.03.06 Operator OH
7 22.01.01.03.07 Pekerja (buruh tak trampil) OH
8 22.01.01.03.08 Pekerja (buruh agak trampil) OH
9 22.01.01.03.09 Pekerja (buruh trampil) OH
10 22.01.01.03.10 Pembantu Operator Alat Konsruksi OH
11 22.01.01.03.11 Pembantu Sopir OH
12 22.01.01.03.12 Penganyam Bronjong OH
13 22.01.01.03.13 Penjaga OH

74
1 2 3 4 5
14 22.01.01.03.14 Sopir OH
15 22.01.01.03.15 Tenaga Logistik OH
22.01.01.04 Tenaga Pendukung Jasa Konstruksi
1 22.01.01.04.01 Asisten Geologi OH
2 22.01.01.04.02 Site Manager OH
3 22.01.01.04.03 Asisten Driller OH
4 22.01.01.04.04 Driller OH
5 22.01.01.04.05 Kepala Pemompaan Uji OH
6 22.01.01.04.06 Tenaga Ahli Geologi OH
7 22.01.01.04.07 Tool Pusher OH
8 22.01.01.04.08 Watchman OH
22.01.02 JASA PEMELIHARAAN
22.01.02.01 Tenaga Perbaikan Mesin Penggerak
1 22.01.02.01.01 Pengecatan Mesin Unit
2 22.01.02.01.02 Penyempurnaan Panel Unit Bh
3 22.01.02.01.03 Perbaikan Knalpot Bh
4 22.01.02.01.04 Perbaikan Oil Pump Bh
5 22.01.02.01.05 Poles Liner Bh
6 22.01.02.01.06 Rebuilt Stang Piston Bh
7 22.01.02.01.07 Rekondisi Dinamo Amper Unit
8 22.01.02.01.08 Rekondisi Dinamo Stater Unit
9 22.01.02.01.09 Service Oil Cooller Bh
10 22.01.02.01.10 Skur Valve Bh
11 22.01.02.01.11 Slep dan Sentering As Cruck Bh
12 22.01.02.01.12 Test dan service Boschpump Unit
13 22.01.02.01.13 Test dan service Nozle Bh
22.01.02.02 Tenaga Pemeliharaan AC
1 22.01.02.02.01 Ganti Kompresor AC Windows 1 PK Unit
2 22.01.02.02.02 Ganti Kompresor AC Windows 1,5 PK Unit
3 22.01.02.02.03 Ganti Kompresor AC Windows 2 PK Unit
4 22.01.02.02.04 Isi Freon AC AC Split 0,5 - 1 PK Unit
5 22.01.02.02.05 Isi Freon AC AC Split 1,5 – 2 PK Unit
6 22.01.02.02.06 Isi Freon AC AC Split 2 – 2,5 PK Unit
7 22.01.02.02.07 Isi Freon AC AC Split 5 PK Unit
8 22.01.02.02.08 Pemeliharaan 1 PK AC Split Unit
9 22.01.02.02.09 Pemeliharaan 1 PK AC Windows Unit
10 22.01.02.02.10 Pemeliharaan 2 PK AC Split Unit
22.01.02.03 Tenaga Pemeliharaan Mesin Tulis
1 22.01.02.03.01 Service dan Perbaikan Mesin Calculator Unit
2 22.01.02.03.02 Service dan Perbaikan Mesin Hitung Listrik Unit
3 22.01.02.03.03 Service dan Perbaikan Mesin Hitung Manual Unit
4 22.01.02.03.04 Service dan Perbaikan Mesin Hitung Tangan Unit
5 22.01.02.03.05 Service dan Perbaikan Mesin Tulis KK Listrik Unit
6 22.01.02.03.06 Service dan Perbaikan Mesin Tulis KK Manual Unit
22.01.02.04 Tenaga Pemeliharaan Kendaraan
1 22.01.02.04.01 Penggantian Ban Unit
2 22.01.02.04.02 Service/Tune up Unit
3 22.01.02.04.03 Turun Garden unit
4 22.01.02.04.04 Turun Mesin Bensin Unit
5 22.01.02.04.05 Turun Mesin Solar Unit
6 22.01.02.04.06 Turun Versenelling Unit
22.01.02.05 Tenaga Pemeliharaan Mebelair
1 22.01.02.05.01 Perbaikan Dan Pelitur Meja buah

75
1 2 3 4 5
2 22.01.02.05.02 Perbaikan Kursi buah
3 22.01.02.05.03 Perbaikan Meja buah
22.01.03 JASA KONSULTASI
22.01.03.01 Tenaga Ahli Pembina Kepala
1 22.01.03.01.01 Ahli Pembina Kepala S1 ( Pengalaman Kerja 21 Th ) OB
2 22.01.03.01.02 Ahli Pembina Kepala S1 ( Pengalaman Kerja 22 Th ) OB
3 22.01.03.01.03 Ahli Pembina Kepala S1 ( Pengalaman Kerja 23 Th ) OB
4 22.01.03.01.04 Ahli Pembina Kepala S1 ( Pengalaman Kerja 24 Th ) OB
5 22.01.03.01.05 Ahli Pembina Kepala S1 ( Pengalaman Kerja 25 Th ) OB
6 22.01.03.01.06 Ahli Pembina Kepala S2 ( Pengalaman Kerja 17 Th ) OB
7 22.01.03.01.07 Ahli Pembina Kepala S2 ( Pengalaman Kerja 18 Th ) OB
8 22.01.03.01.08 Ahli Pembina Kepala S2 ( Pengalaman Kerja 19 Th ) OB
9 22.01.03.01.09 Ahli Pembina Kepala S2 ( Pengalaman Kerja 20 Th ) OB
10 22.01.03.01.10 Ahli Pembina Kepala S2 ( Pengalaman Kerja 21 Th ) OB
11 22.01.03.01.11 Ahli Pembina Kepala S3 ( Pengalaman Kerja 13 Th ) OB
12 22.01.03.01.12 Ahli Pembina Kepala S3 ( Pengalaman Kerja 14 Th ) OB
13 22.01.03.01.13 Ahli Pembina Kepala S3 ( Pengalaman Kerja 15 Th ) OB
14 22.01.03.01.14 Ahli Pembina Kepala S3 ( Pengalaman Kerja 16 Th ) OB
15 22.01.03.01.15 Ahli Pembina Kepala S3 ( Pengalaman Kerja 17 Th ) OB
22.01.03.02 Tenaga Ahli Kepala
1 22.01.03.02.01 Ahli S1 ( Pengalaman Kerja 17 Th ) OB
2 22.01.03.02.02 Ahli S1 ( Pengalaman Kerja 18 Th ) OB
3 22.01.03.02.03 Ahli S1 ( Pengalaman Kerja 19 Th ) OB
4 22.01.03.02.04 Ahli S1 ( Pengalaman Kerja 20 Th ) OB
5 22.01.03.02.05 Ahli S2 ( Pengalaman Kerja 13 Th ) OB
6 22.01.03.02.06 Ahli S2 ( Pengalaman Kerja 14 Th ) OB
7 22.01.03.02.07 Ahli S2 ( Pengalaman Kerja 15 Th ) OB
8 22.01.03.02.08 Ahli S2 ( Pengalaman Kerja 16 Th ) OB
9 22.01.03.02.09 Ahli S3 ( Pengalaman Kerja 9 Th ) OB
10 22.01.03.02.10 Ahli S3 ( Pengalaman Kerja 10 Th ) OB
11 22.01.03.02.11 Ahli S3 ( Pengalaman Kerja 11 Th ) OB
12 22.01.03.02.12 Ahli S3 ( Pengalaman Kerja 12 Th ) OB
22.01.03.03 Tenaga Ahli Utama
1 22.01.03.03.01 Ahli Utama S1 ( Pengalaman Kerja 13 Th ) OB
2 22.01.03.03.02 Ahli Utama S1 ( Pengalaman Kerja 14 Th ) OB
3 22.01.03.03.03 Ahli Utama S1 ( Pengalaman Kerja 15 Th ) OB
4 22.01.03.03.04 Ahli Utama S1 ( Pengalaman Kerja 16 Th ) OB
5 22.01.03.03.05 Ahli Utama S2 ( Pengalaman Kerja 9 Th ) OB
6 22.01.03.03.06 Ahli Utama S2 ( Pengalaman Kerja 10 Th ) OB
7 22.01.03.03.07 Ahli Utama S2 ( Pengalaman Kerja 11 Th ) OB
8 22.01.03.03.08 Ahli Utama S2 ( Pengalaman Kerja 12 Th ) OB
9 22.01.03.03.09 Ahli Utama S3 ( Pengalaman Kerja 5 Th ) OB
10 22.01.03.03.10 Ahli Utama S3 ( Pengalaman Kerja 6 Th ) OB
11 22.01.03.03.11 Ahli Utama S3 ( Pengalaman Kerja 7 Th ) OB
12 22.01.03.03.12 Ahli Utama S3 ( Pengalaman Kerja 8 Th ) OB
22.01.03.04 Tenaga Ahli Madya
1 22.01.03.04.01 Ahli Madya S1 ( Pengalaman Kerja 9 Th ) OB
2 22.01.03.04.02 Ahli Madya S1 ( Pengalaman Kerja 10 Th ) OB
3 22.01.03.04.03 Ahli Madya S1 ( Pengalaman Kerja 11 Th ) OB
4 22.01.03.04.04 Ahli Madya S1 ( Pengalaman Kerja 12 Th ) OB
5 22.01.03.04.05 Ahli Madya S2 ( Pengalaman Kerja 5 Th ) OB
6 22.01.03.04.06 Ahli Madya S2 ( Pengalaman Kerja 6 Th ) OB
7 22.01.03.04.07 Ahli Madya S2 ( Pengalaman Kerja 7 Th ) OB
8 22.01.03.04.08 Ahli Madya S2 ( Pengalaman Kerja 8 Th ) OB

76
1 2 3 4 5
9 22.01.03.04.09 Ahli Madya S3 ( Pengalaman Kerja 1 Th ) OB
10 22.01.03.04.10 Ahli Madya S3 ( Pengalaman Kerja 2 Th ) OB
11 22.01.03.04.11 Ahli Madya S3 ( Pengalaman Kerja 3 Th ) OB
12 22.01.03.04.12 Ahli Madya S3 ( Pengalaman Kerja 4 Th ) OB
22.01.03.05 Tenaga Ahli Muda
1 22.01.03.05.01 Ahli Muda S1 ( Pengalaman Kerja 5 Th ) OB
2 22.01.03.05.02 Ahli Muda S1 ( Pengalaman Kerja 6 Th ) OB
3 22.01.03.05.03 Ahli Muda S1 ( Pengalaman Kerja 7 Th ) OB
4 22.01.03.05.04 Ahli Muda S1 ( Pengalaman Kerja 8 Th ) OB
5 22.01.03.05.05 Ahli Muda S2 ( Pengalaman Kerja 1 Th ) OB
6 22.01.03.05.06 Ahli Muda S2 ( Pengalaman Kerja 2 Th ) OB
7 22.01.03.05.07 Ahli Muda S2 ( Pengalaman Kerja 3 Th ) OB
8 22.01.03.05.08 Ahli Muda S2 ( Pengalaman Kerja 4 Th ) OB
22.01.03.06 Tenaga Ahli Pratama
1 22.01.03.06.01 Ahli Pratama S1 ( Pengalaman Kerja 3 Th ) OB
2 22.01.03.06.02 Ahli Pratama S1 ( Pengalaman Kerja 4 Th ) OB
22.01.03.07 Tenaga Pendukung
1 22.01.03.07.01 Juru Gambar OB
2 22.01.03.07.02 Office Manager OB
3 22.01.03.07.03 Operator Komputer OB
4 22.01.03.07.04 Sekretaris OB
5 22.01.03.07.05 Sekretaris Bilingual OB
6 22.01.03.07.06 Sopir Skywalker OH
7 22.01.03.07.07 Sopir Truk OH
8 22.01.03.07.08 Staf Administrasi OH
9 22.01.03.07.09 Surveyor Geodesi OH
10 22.01.03.07.10 Surveyor Lokasi/Lapangan OH
22.01.03.08 Tenaga Teknisi Komputer
1 22.01.03.08.01 Decomentator OB
2 22.01.03.08.02 Designer OB
3 22.01.03.08.03 Implementator OB
4 22.01.03.08.04 Manager Tim OB
5 22.01.03.08.05 Programer Senior OB
6 22.01.03.08.06 Programer Yunior OB
7 22.01.03.08.07 Sistem Analis OB
8 22.01.03.08.08 Sistem Analis dan Designer OB
9 22.01.03.08.09 Tenaga Data Entry OH
10 22.01.03.08.10 Tenaga Instalansi Jaringan OH
11 22.01.03.08.11 Tenaga Programmer OH
12 22.01.03.08.12 Tenaga Teknisi Hardware OH
13 22.01.03.08.13 Tester OB

77
S
A
T
U
HARGA HARGA
A
SATUAN 2018 N
###
2
0
1
6

95,000
###
95,000
###
95,000
###
95,000
###
95,000
###
95,000
###
95,000
###
95,000
###
100,000
###
95,000
###
95,000
###
95,000
###

90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###
90,000
###

450,000
###
100,000
###
90,000
###
75,000
###
75,000
###
90,000
###
65,000
###
67,500
###
70,000
###
90,000
###
78,800
###
70,000
###
###

78
###
90,000
###
70,000
###

80,000
###
75,000
###
40,000
###
55,000
###
55,000
###
120,000
###
50,000
###
###

200,000
###
266,000
###
200,000
###
100,000
###
86,500
###
80,500
###
1,106,500
###
1,328,000
###
61,000
###
12,500
###
46,500
###
183,000
###
70,000
###

1,000,000
###
2,000,000
###
4,000,000
###
400,000###
350,000###
200,000###
175,000###
75,000
###
75,000
###
100,000
###

40,000
###
50,000
###
40,000
###
###
###
###

40,000
###
100,000
###
200,000
###
500,000
###
550,000
###
200,000
###

75,000
###

79
###
40,000
###
50,000
###

24,210,000
###
25,110,000
###
26,010,000
###
26,610,000
###
27,810,000
###
27,810,000
###
28,890,000
###
29,970,000
###
31,140,000
###
32,220,000
###
30,240,000
###
31,410,000
###
32,670,000
###
33,840,000
###
35,010,000
###

20,610,000
###
21,510,000
###
22,410,000
###
23,310,000
###
23,400,000
###
24,570,000
###
25,650,000
###
26,730,000
###
25,470,000
###
26,640,000
###
27,900,000
###
29,070,000
###

17,010,000
###
17,910,000
###
18,810,000
###
19,710,000
###
19,080,000
###
20,160,000
###
21,240,000
###
22,320,000
###
20,700,000
###
21,870,000
###
23,130,000
###
24,300,000
###

13,410,000
###
14,310,000
###
15,210,000
###
16,110,000
###
14,670,000
###
15,750,000
###
16,830,000
###
17,910,000
###

80
###
15,930,000
###
17,100,000
###
18,360,000
###
19,500,000
###

9,810,000
###
10,710,000
###
11,610,000
###
12,510,000
###
10,260,000
###
11,340,000
###
12,510,000
###
13,590,000
###

8,010,000
###
8,910,000
###

1,600,000
###
2,300,000
###
1,300,000
###
1,200,000
###
2,100,000
###
70,000
###
70,000
###
750,000
###
###
-
###

2,811,400
###
5,622,800
###
5,622,800
###
7,871,900
###
5,000,000
###
1,600,000
###
7,000,000
###
7,000,000
###
75,000
###
80,000
###
80,000
###
100,000
###
5,000,000
###

81
XIII. BIAYA SEWA PERALATAN KEGIATAN

KODE
NO NAMA BARANG MERK / UKURAN
BARANG
1 2 3 4
21.02 BIAYA SEWA
21.02.01. SEWA ALAT KONTRUKSI
21.02.01.01 Sewa Alat Berat
1 21.02.01.01.01 Alat Bantu Strouss Pile
3 21.02.01.01.03 Alat pemadat (Timbris)
18 21.02.01.01.18 Fuel Tank truck
19 21.02.01.01.19 Incinerator
22 21.02.01.01.22 Lune Truck
23 21.02.01.01.23 Mesin Pemadat Vibrator
24 21.02.01.01.24 Mesin Pemotong Rumput Dorong
25 21.02.01.01.25 Mesin Pemotong Rumput Gendong (Chainsaw)
26 21.02.01.01.26 Mesin Poles
27 21.02.01.01.27 Molen
31 21.02.01.01.31 Pengadaan dan Pemasangan
34 21.02.01.01.34 Piellscale (bahan Marmer)
Pompa turbine
35 21.02.01.01.35 Pompa Uji
36 21.02.01.01.36 Road marking machine
40 21.02.01.01.40 Sprayer Selfprop Kapasitas; 1000 L
43 21.02.01.01.43 TC
46 21.02.01.01.46 Tripot dan Timbris.
47 21.02.01.01.47 Truck
48 21.02.01.01.48 Vibrator beton.
21.02.01.02 Sewa Alat Ringan
3 21.02.01.02.03 Alat Bantu Pemasangan Stoplog
21.02.01.03. Sewa Alat Ukur
1 21.02.01.03.01 Sewa Alat Ukur Theodolit
2 21.02.01.03.02 Sewa Waterpass
21.02.03. SEWA ALAT TRANSPORTASI
21.02.03.01. Sewa Mobil Angkutan Barang
6 21.02.03.01.06 Truck Tangki Air
11 21.02.03.01.11 Truk Angkutan Dalam Kota
14 21.02.03.01.14 Dump Truck Kapasitas 3.5 T
HARGA
SATUAN
SATUAN 2018
5

Jam 16,500
Jam 33,600
Jam 114,030
Jam 4,778
Jam 52,763
Unit/Hari 115,500
Unit/Hari 86,650
Unit/Hari 43,350
Unit/Hari 28,900
Unit/Hari 121,300
Unit 127,365
Unit/Hari 26,565,000
Jam 18,218
Jam 24,255
Jam 54,600
Bulan 69,300,000
Unit/Hari 500,000
Unit 333,533
Unit/Hari 97,050

Unit/Hari 42,750

Unit/Hari 202,400
Unit/Hari 6,800

Unit/Hari 866,250
Jam 126,213
Jam 280,000
HARGA BAHAN KONSTRUKSI 2019

NO URAIAN KETERANGAN

1 Bata Merah
2 Bata Ringan
3 Batu Kali Batu Belah Pondasi ( 15/20)
4 Batu Pecah Mesin 5-10 mm
5 Batu Split Pecah Mesin 1/2
6 Batu Split Pecah Mesin 2/3
7 Batu Split Pecah Mesin 3/5
8 Batu Pecah Tangan 5/7
9 Gravel
10 Pasir Beton
11 Pasir Pasang
12 Pasir Urug
13 Tanah Urug
14 Sirtu
15 Tanah Tanam
16 Aspal Bitumen
17 Aspal
18 Aspal Emulsi
19 Asbuton Halus
20 Kerosen / Minyak Tanah
21 Bensin
22 Solar
23 Minyak Pelumas (Oli)
24 Gebalan Rumput
25 Glass Bit
26 Semen ( 50 Kg ) Gresik
27 Semen ( 50 Kg ) Holcim
28 Semen ( 40 Kg ) Gresik
29 Semen ( 40 Kg ) Holcim
30 Semen Warna
31 Besi Beton Polos
32 Besi Beton Ulir
NO URAIAN KETERANGAN

33 Kawat Beton
34 Kawat Seling dia. 10 mm
35 Kawat Bronjong 3'-4"
36 Rangka Atap Baja Ringan Smart Truss
37 Rangka Atap Baja Ringan Kencana
38 Baja WF
39 Kanal C
40 Plat Siku
41 Plat Strip
NO URAIAN KETERANGAN

42 Besi Hollow Galvalume 4 x 4 Panjang 6m tebal 1mm


43 Besi Hollow Galvalume 2 x 4 Panjang 6m
44 Pipa Besi Hollow Kotak 3 x 3, panjang 6 m tebal 2mm
45 Pipa Besi Hollow Kotak 2 x 4, panjang 6 m tebal 2 mm
46 Pipa Besi Hollow Kotak 4 x 4, panjang 6 m tebal 2 mm
47 Pipa Besi Hollow Kotak 5 x 5, panjang 6 m tebal 2mm
48 Pipa Besi Hollow Kotak 6 x 6, panjang 6 m tebal 2 mm
49 Pipa Besi Hollow Kotak 7 x 7, panjang 6 m tebal 2 mm
50 Pipa Gas 1" x 2 mm - 6m
51 Pipa Gas 1,25" x 2 mm - 6m
52 Pipa Gas 1,5" x 2 mm - 6m
53 Pipa Gas 2" x 2,3 mm - 6m
54 Pipa Gas 2,5" x 2,3 mm - 6m
55 Pipa Gas 3" x 2,3 mm - 6m
56 Pipa Gas 4" x 2,3 mm - 6m
57 Pipa Gas 5" x 2,3 mm - 6m
58 Pipa Gas 6" x 2,5 mm - 6m
59 Besi Wiremesh M6, Uk. 2,1 x 5,4 m
60 Baja Ringan Zincalum, C75 - 1mm Kencana - 6m
61 Baja Ringan Zincalum, C75 - 1mm EKG - 6m
62 Baja Ringan Zincalum, C75 - 0.75mm Kencana - 6m
63 Baja Ringan Zincalum, C75 - 0.75mm EKG - 6m
64 Baja Ringan Zincalum, Reng TS 40.045 Kencana - 6m
65 Baja Ringan Zincalum, C80 - 0.75mm Quadtruss - 6m
66 Baja Ringan Zincalum, C80 -1mm Quadtruss - 6m
67 Baja Ringan Zincalum, Reng TS 35.045 EKG - 6m
68 Baja Ringan Zincalum, Reng 30.045 Quadtruss - 6m
69 Genteng Kodok Ex. Trenggalek
70 Genteng Kodok Ex. Karangpilang - Type Itali
71 Genteng Kodok Ex. Karangpilang - Type Gemini
72 Genteng Kodok Ex. Karangpilang - Type Grande
73 Genteng Beton Ex. Cisangkan
74 Genteng Keramik
75 Genteng Glassur Kanmuri
76 Wuwungan Ex. Trenggalek
NO URAIAN KETERANGAN

77 Wuwungan Ex. Karangpilang


78 Wuwungan Ex. Cisangkan
79 Wuwungan Keramik
80 Wuwungan Glassur
81 Penutup AtapZincalum Tebal = 0,3 mm
82 Penutup AtapZincalum Tebal = 0,35 mm
83 Penutup AtapZincalum Tebal = 0,4 mm
84 Aluminum Karet Kusen Aluminium
85 Aluminum Profil 3" Coklat ( 3 x 7.5 )
86 Aluminum Profil 3" Putih ( 3 x 7.5 )
87 Aluminum Profil 4" Coklat ( 4 x 10 )
88 Aluminum Profil 4" Putih ( 4 x 10 )
89 Aluminum Slimar 3/8" Jendela
NO URAIAN KETERANGAN

90 Allumunium Foil Bubble, Double Side Medium t = 4mm


91 Allumunium Foil Tape 48 mm x 45 m
92 Amplas Halus Feting 0 s/d 3
93 Amplas Kasar Fujistar 0 s/d 1000
94 Asbes Gel Besar Tbl 4 mm ; 3 x 1.05 m
95 Asbes Datar uk. 100 x 100 x 0.3Cm
96 Asbes Gel. Kecil Tbl 5 mm ; 2.00 x 0.92
97 Closet Jongkok ex. Ina
98 Closet Duduk ex. Toto Lengkap
99 Closet Duduk ex. INA Lengkap
99 Floor Drain
100 Wastafel Ex. INA
101 Urinoir Ex. Toto
102 Bak Cuci Piring Stainless+avur
103 Keramik Granito Polos 60/60
104 Keramik Granito Gelap 60/60
105 Keramik Roman Granit Terang dof 60/60
106 Keramik Roman Granit Motif Terang dof 60/60
107 Keramik Roman Granit Motif Gelap dof 60/60
108 Keramik Happy House Polos 60/60
109 Keramik Happy House Motif Terang 60/60
110 Keramik Top Gress Polos 60/60
111 Keramik Top Gress Garis/ Kayu 60/60
112 Keramik Top Gress Gelap 60/60
113 Keramik Top Gress Batu Tumpah 60/60
114 Keramik Valentino Middle Black 60/60
115 Keramik Valentino Garis 60/60
116 Keramik Motif 20 x 20 ( asia )
117 Keramik Motif 20 x 25 ( asia )
118 Keramik Motif 30 x 30 ( asia )
119 Keramik Motif 40 x 40 ( asia )
120 Keramik Polos 20 x 25 (mulia)
121 Keramik Polos 30 x 30 (asia)
122 Keramik Polos 40 x 40 (asia)
123 Keramik List motif / variasi
NO URAIAN KETERANGAN

124 Keramik Kasar 40 x 40


125 Keramik Kasar 60 x 60
126 Lem Kayu, Rajawali
127 Lem PVC
NO URAIAN KETERANGAN

128 sealent
129 Marmer Ex. Tulungagung 30 x 60 cm
130 Marmer Ex. Tulungagung 60 x 60 cm
131 Marmer Ex. Tulungagung 60 x 60 cm
132 Marmer Ex. Ujung Pandang 30 x 60 cm
133 Marmer Ex. Ujung Pandang 60 x 60 cm
134 Marmer Ex. Ujung Pandang 60 x 120 cm
135 Marmer Ex. Ujung Pandang 150 x 250 rendem
136 Granit Ex. Sumedang 30x60 cm
137 Granit Ex. Sumedang 40x60 cm
138 Granit Ex. Sumedang 60x60 cm
139 Granit Ex. Sumedang 60x90 cm
140 Granit Ex. Sumedang 60x100 cm
141 Granit Ex. Sumedang 60x120 cm
142 Granit Ex. Hijau SR 30x60 cm
143 Granit Ex. Hijau SR 40x60 cm
144 Granit Ex. Hijau SR 60x60 cm
145 Granit Ex. Hijau SR 30xpanjang
146 Marmer Plint
147 Kaca Polos Bening 8 mm
148 Kaca Polos Bening 10 mm
149 Kaca Polos Bening 12 mm
150 Kaca Polos Bening tebal 3mm
151 Kaca Polos Bening tebal 5mm
152 Kaca Rayben tebal 3mm
153 Kaca Rayben tebal 5mm
154 Kaca Kaca Es Tebal 5mm
155 Kaca Vertical Blind
156 Kaca Acrylic, bening uk. 5mm ( 122 x 244 cm )
157 Kaca Acrylic, bening uk. 10mm ( 122 x 244 cm )
158 Kaca Kaca Tempered Warna Tebal 8 mm
159 Kaca Tempered Warna Tebal 10 mm
160 Kaca Kaca Tempered Warna Tebal 12 mm
161 Batu Batako Semen (40x 20x 10 cm)
162 Batu Candi Alur
NO URAIAN KETERANGAN

163 Batu Batu Susun Sirih


164 Batu Andesit Uk. 20 x 40
165 Batu Looster, abu-abu (55x25) cm
166 Batu Looster, Merah (10x25) cm
167 Batu Palimanan Hijau
168 Batu Palimanan Kuning
NO URAIAN KETERANGAN

169 Seng Gelombang BJLS 30 uk. (80 x 210 cm)


170 Seng Gelombang BJLS 30 uk. (80x 300cm)
171 Seng Gelombang BJLS 30 uk. (80x 180cm)
172 Seng Gelombang BJLS 40 uk. (80 cm x300 cm)
173 Seng Gelombang Nok Stel Gelombang Seng
174 Seng Gelombang Plat BJLS 30/40 cm
175 Atap Spandek tebal 0,4 lb 75 cm
176 Buis Beton Bulat 15/100 cm
177 Buis Beton Bulat 20/100 cm
178 Buis Beton Bulat 30/100 cm
179 Buis Beton Bulat 40/100 cm
180 Buis Beton Bulat 50/100 cm
181 Buis Beton Bulat 50/50 cm
182 Buis Beton Bulat 60/100 cm
183 Buis Beton Bulat 60/50 cm
184 Buis Beton Bulat 80/100 cm
185 Buis Beton Bulat 80/50 cm
186 Buis Beton Bulat 100/50 cm
187 Buis Beton U 15 cm pj 100 cm
188 Buis Beton U 20 cm
189 Buis Beton U 30 cm
190 Buis Beton U 40 cm
191 Buis Beton U 50 cm
192 Paku Paku Asbes
193 Paku Paku Biasa/ keling/ Usuk/ Triplek/ Eternit/ Reng
194 Paku Paku Sekrup Besar
195 Paku Sekrup 1"
196 Pintu Kamar Mandi Aluminium Uk.70 x 200cm
197 Pintu Kamar Mandi PVC polos uk. 197 x 70 cm
198 Sekrup 2"
199 Gypsum board Tebal 12 mm
200 Gypsum board Tebal 9 mm
201 Kalsiboard Uk. 244 x 122 x 3,5 mm
202 Kalsiboard Uk. 244 x 122 x 6 mm
203 Kalsiplank lbr = 20 cm
NO URAIAN KETERANGAN

204 Kalsiplank lbr = 30 cm


205 Lisplank GRC lantai 1
206 Lisplank GRC Lantai 2
207 Ornamen buntu Masif
208 Ornamen lubang/ Trawangan
NO URAIAN KETERANGAN

211 Kolom Non Motif


212 Kolom Motif
213 Kaligrafi
214 Tandon Air Stainless + Fiber
215 Engsel kuningan 3" (Pintu Kayu)
216 Engsel muller kuning 5" (Pintu Alm.)
217 Engsel salon HK 20
218 Engsel Solid EK 17
219 Grendel Grendel Biasa (Besar)
220 Grendel Grendel Biasa (Kecil)
221 Kran model engkol type CLS 04 Onda 1/2" dan 3/4"
222 Kran Putar Untuk Tanaman 3/4"
223 Kran Bebek, Fio 10 JC
224 Kunci Kuda Terbang 2x Putar
225 Kunci Kunci Tanam Aluminium
226 Kunci Kunci Tanam Biasa
227 Kunci Kunci Tanam Kamar Mandi
228 Handle Solid HRE 6141
229 Hak Angin Biasa
230 Hak Angin Kuningan
231 Kait Angin
232 Hak Angin Lurus Kuningan
233 Door Holder
234 Door Kloser
235 Door Stop
236 Rel Pintu Dorong
237 Rel Pintu Dorong Uk. 90
238 Kabel NYA Supreme, 2 x 2,5 mm
239 Kabel NYY Supreme, 4 X 10 mm
240 kabel NYYHY Eterna, 2 x 1.5 mm
241 kabel NYYHY Eterna, 3 x 1.5 mm
242 kabel NYYHY Eterna, 3 x 4 mm
243 kabel NYYHY Eterna, 3 x 6 mm
244 kabel NYYHY Eterna, 4 x 6 mm
245 Kabel Tray Lebar 100 x Tinggi 50 x Panjang 2400 x Ketebalan Pl
NO URAIAN KETERANGAN

246 Kabel Tray Lebar 200 x Tinggi 50 x Panjang 2400 x Ketebalan Pl


247 Kabel Feeder
248 Lampu TL Philips, 18 watt
249 Lampu TL Philips, 20 Watt + Kap
250 Lampu TL Philips, 40 Watt + Kap
NO URAIAN KETERANGAN

251 Lampu Essential Philips, 18 watt


252 Lampu Essential Philips, 23 watt
253 Lampu RM 2 x 36 Watt, Fatro
254 Lampu RM 2 x 18 Watt, Fatro
255 Lampu RM 2 x 36 Watt, Artolite
256 Lampu RM 2 x 18 Watt, Artolite
257 2 x 36 Watt, Saka
258 2 x 18 Watt, Saka
259 Lampu Downlight SM D 150 E27 PL ESS 18W, Artolite
260 Lampu Downlight RD 150 E27 SAVY PL ESS 18W, Artolite
261 Stop Kontak Broco, 2 Port
262 Saklar Broco, Ganda
263 Saklar Broco, Engkel IB
264 Fitting Plafon
265 MCB 10A, 3 Phase Schneider
266 MCB 4A, 1 Phase Schneider
267 MCB 25A, 3 Phase Schneider
268 MCB 50A, 3 Phase Schneider
269 Pipa Pralon 5/8"
270 Pipa PVC Maspion AW 1 1/2" X 6 m
271 Pipa PVC Maspion AW 1 1/4" X 6 m
272 Pipa PVC Maspion AW 1" X 4 m
273 Pipa PVC Maspion AW 1" X 6 m
274 Pipa PVC Maspion AW 1 1/4" X 4 m
275 Pipa PVC Maspion AW 1 1/2" X 4 m
276 Pipa PVC Maspion AW 1/2" X 4 m
277 Pipa PVC Maspion AW 1/2" X 6 m
278 Pipa PVC Maspion AW 10" X 4 m
279 Pipa PVC Maspion AW 2 1/2" X 6 m
280 Pipa PVC Maspion AW 2" X 4 m
281 Pipa PVC Maspion AW 3" X 4 m
282 Pipa PVC Maspion AW 3/4" X 4 m
283 Pipa PVC Maspion AW 4" X 4 m
284 Pipa PVC Maspion AW 5" X 4 m
285 Pipa PVC Maspion AW 5" X 6 m
NO URAIAN KETERANGAN

286 Pipa PVC Maspion AW 6" X 4 m


287 Pipa PVC Maspion AW 8" x 4 m
288 Pipa PVC Maspion AW 8" X 6 m
289 Pipa PVC Maspion C 1 1/2" X 4 m
290 Pipa PVC Maspion C 1 1/2" X 6 m
291 Pipa PVC Maspion C 1 1/4" X 4 m
292 Pipa PVC Maspion C 1 1/4" X 6 m
293 Pipa PVC Maspion C 1" X 4 m
294 Pipa PVC Maspion C 1" X 6 m
295 Pipa PVC Maspion C 2 1/2" X 4 m
NO URAIAN KETERANGAN

296 Pipa PVC Maspion C 2 1/2" X 6 m


297 Pipa PVC Maspion C 2" X 4 m
298 Pipa PVC Maspion C 2" X 6 m
299 Pipa PVC Maspion C 3" X 4 m
300 Pipa PVC Maspion C 3" X 6 m
301 Pipa PVC Maspion C 3/4" X 4 m
302 Pipa PVC Maspion C 3/4" X 6 m
303 Pipa PVC Maspion C 4" X 4 m
304 Pipa PVC Maspion C 4" X 6 m
305 Pipa PVC Maspion C 5/8" X 4 m
306 Pipa PVC Maspion C 5/8" X 6 m
307 Pipa PVC Maspion D 2 1/2" X 6 m
308 Pipa PVC Maspion D 1 1/2" X 6 m
309 Pipa PVC Maspion D 1 1/4" X 6 m
310 Pipa PVC Maspion D 1 1/4" X 4 m
311 Pipa PVC Maspion D 1 1/2" X 4 m
312 Pipa PVC Maspion D 10" X 4 m
313 Pipa PVC Maspion D 10" X 6 m
314 Pipa PVC Maspion D 12" X 4 m
315 Pipa PVC Maspion D 12" X 6 m
316 Pipa PVC Maspion D 2" X 4 m
317 Pipa PVC Maspion D 2" X 6 m
318 Pipa PVC Maspion D 2 1/2" X 4 m
319 Pipa PVC Maspion D 3" X 4 m
320 Pipa PVC Maspion D 3" X 6 m
321 Pipa PVC Maspion D 4" X 4 m
322 Pipa PVC Maspion D 4" X 6 m
323 Pipa PVC Maspion D 5" X 4 m
324 Pipa PVC Maspion D 5" X 6 m
325 Pipa PVC Maspion D 6" X 4 m
326 Pipa PVC Maspion D 6" X 6 m
327 Pipa PVC Maspion D 8" X 4 m
328 Pipa PVC Maspion D 8" X 6 m
329 Pipa PVC Langgeng Dia 1/2" S-12,5 @ 6m MOF
330 Pipa PVC Maspion Dia 1" S-12,5 @ 6m
NO URAIAN KETERANGAN

331 Supralon Dia 1" S-12,5 @ 6m


332 Langgeng Dia 1" S-12,5 @ 6m
333 Pipa PVC Maspion Dia 1 1/2" S-12,5 @ 6m
334 Supralon Dia 1 1/2" S-12,5 @ 6m
335 Langgeng Dia 1 1/2" S-12,5 @ 6m
NO URAIAN KETERANGAN

336 Pipa PVC Maspion Dia 10" S-12,5 @ 6m


337 Supralon Dia 10" S-12,5 @ 6m
338 Langgeng Dia 10" S-12,5 @ 6m
339 Pipa PVC Maspion Dia 2" S-12,5 RR @ 6m
340 Supralon Dia 2" S-12,5 RR @ 6m
341 Langgeng Dia 2" S-12,5 RR @ 6m
342 Pipa PVC Maspion Dia 2 1/2" S-12,5 RR @ 6m
343 Supralon Dia 2 1/2" S-12,5 RR @ 6m
344 Langgeng Dia 2 1/2" S-12,5 RR @ 6m
345 Pipa PVC Maspion Dia 3" S-12,5 RR @ 6m
346 Supralon Dia 3" S-12,5 RR @ 6m
347 Langgeng Dia 3" S-12,5 RR @ 6m
348 Pipa PVC Langgeng Dia 3/4" S-12,5 @ 6m
349 Pipa PVC Maspion Dia 4" S-12,5 RR @ 6m
350 Supralon Dia 4" S-12,5 RR @ 6m
351 Langgeng Dia 4" S-12,5 RR @ 6m
352 Pipa PVC Maspion Dia 6" S-12,5 MOF @ 6m
353 Supralon Dia 6" S-12,5 MOF @ 6m
354 Langgeng Dia 6" S-12,5 MOF @ 6m
355 Pipa PVC Maspion Dia 6" S-12,5 RR @ 6m
356 Supralon Dia 6" S-12,5 RR @ 6m
357 Langgeng Dia 6" S-12,5 RR @ 6m
358 Pipa PVC Maspion Dia 8" S-12,5 MOF @ 6m
359 Supralon Dia 8" S-12,5 MOF @ 6m
360 Langgeng Dia 8" S-12,5 MOF @ 6m
361 Pipa PVC Maspion Dia 8" S-12,5 RR @ 6m
362 Supralon Dia 8" S-12,5 RR @ 6m
363 Langgeng Dia 8" S-12,5 RR @ 6m
364 Pipa Galvanis Dia 1/2" @ 6m Medium B
365 Pipa Galvanis Dia 3/4" @ 6m Medium B
366 Pipa Galvanis Dia 1" @ 6m Medium B
367 Pipa Galvanis Dia 1 - 1/4" @ 6m Medium B
368 Pipa Galvanis Dia 1 - 1/2" @ 6m Medium B
369 Pipa Galvanis Dia 2" @ 6m Medium B
370 Pipa Galvanis Dia 2 - 1/2" @ 6m Medium B
NO URAIAN KETERANGAN

371 Pipa Galvanis Dia 3" @ 6m Medium B


372 Pipa Galvanis Dia 4" @ 6m Medium B
373 Pipa Galvanis Dia 6" @ 6m Medium B
374 Pipa Galvanis Dia 1/2" @ 6m Medium A
375 Pipa Galvanis Dia 3/4" @ 6m Medium A (light)
376 Dia 3/4" @ 6m Medium A
377 Pipa Galvanis Dia 1" @ 6m Medium A (light)
378 Dia 1" @ 6m Medium A
379 Pipa Galvanis Dia 1 - 1/4" @ 6m Medium A (light)
380 Dia 1 - 1/4" @ 6m Medium A
381 Pipa Galvanis Dia 1 - 1/2" @ 6m Medium A (light)
382 Dia 1 - 1/2" @ 6m Medium A
NO URAIAN KETERANGAN

383 Pipa Galvanis Dia 2" @ 6m Medium A (light)


384 Pipa Galvanis Dia 2 - 1/2" @ 6m Medium A (light)
385 Pipa Galvanis Dia 3" @ 6m Medium A (light)
386 Dia 3" @ 6m Medium A
387 Pipa Galvanis Dia 4" @ 6m Medium A (light)
388 Dia 4" @ 6m Medium A
389 Pipa Galvanis Dia 6" @ 6m Medium A (light)
390 Pipa Galvanis Dia 6" @ 6m Medium A
391 Pipa Stainless Dia 5/8" @ 6m (heinse Merah)
392 Pipa Stainless Dia 1 1/4" @ 6m (heinse Merah)
393 Pipa Stainless Dia 1 1/2" @ 6m (heinse Merah)
394 Pipa Stainless Dia 2" @ 6m (heinse Merah)
395 Lem PVC
396 Bend 90' dia 1/2" GI
397 Bend 90' dia 11/2" GI
398 Bend 90' dia 2" GI
399 Bend 90' dia 3" GI
400 Bend 90' dia 4" GI
401 Bend 90' dia 6" GI
402 Bend 900 All Socket RR dia 6"
403 Bend 900 All Socket RR dia 4"
404 Bend 90' All Socket RR dia 3"
405 Bend 90' All Socket RR dia 2"
406 Bend 900 All Socket dia 1,5"
407 Bend 45' All Socket RR dia 6"
408 Bend 45' All Socket RR dia 4"
409 Bend 450 All Socket RR dia 3"
410 Bend 450 All Socket RR dia 2"
411 Bend 450 All Socket dia 1,5"
412 Bend 22,50 All Socket RR dia 4"
413 Bend 22,50 All Socket RR dia 3"
414 Bend 22,50 All Socket RR dia 2"
415 Box Meter (mika)
416 Box Meter (seng)
417 Check valve 2" draat
NO URAIAN KETERANGAN

418 Check valve 2" flange joint


419 Clamp saddle 3/4" - 2"
420 Clamp saddle 1/2" - 2"
421 Clamp saddle 1/2" - 1 1/2"
422 Double Nipple GI Ø 1/2"
423 End cap GI 3"
424 End cap GI 2"
NO URAIAN KETERANGAN

425 End cap GI 1,5"


426 End cap PVC Ø 1/2"
427 End cap PVC Ø 3/4"
428 End cap PVC Ø 1 1/2"
429 End cap PVC Ø 2"
430 End cap PVC Ø 3"
431 Faucet Elbow PVC Ø 1/2"
432 Fiting Plafon Persegi
433 Fix Coupling Ø 1/2"
434 Flange GIP 3/4"
435 Flange Las 1 1/2" GIS 10K
436 Flange Las 2" GIS 10K
437 Flange Las 3" GIS 10K
438 Flange Las 4" GIS 10K
439 Flange Las 6" GIS 10K
440 Flange Socket 6" RR
441 Flange Socket 4" RR
442 Flange Socket 3" RR
443 Flange Socket 2" RR
444 Flange Socket 1,5"
445 Fleksibel Join 1,5"
446 Fleksibel Join 2"
447 Fleksibel Join 3"
448 Fleksibel Join 4"
449 Pressure Gauge Dia 2"
450 Reducer GI 3" - 2"
451 Reducer All Socket 4" x 3" RR
452 Reducer All Socket 4" x 2" RR
453 Reducer All Socket 3" x 2" RR
454 Reducer All Socket 3" x 1,5" RR
455 Reducer All Socket 2" x 1,5" RR
456 Repair Socket 3"
457 Repair Socket 2"
458 Repair Socket 1,5"
459 Screener 2-5 mm
NO URAIAN KETERANGAN

460 Sock draat luar PVC 3/4"


461 Sock draat luar PVC 1/2"
462 Tee All Socket 4" x 4" RR
463 Tee All Socket 3" x 3" RR
464 Tee All Socket 2" x 2" RR
465 Tee All Socket 1,5" x 1,5"
466 Tee All Socket 1" x 1"
NO URAIAN KETERANGAN

467 Tee Reducer All Socket 3" x 2" RR


468 Tee Reducer All Socket 3"x1,5" RR
469 Tee Reducer All Socket 2"x1,5" RR
470 Tee All Flange Cor 2"
471 Tee All Flange Cor 3"
472 Tee PVC dia. 1/2"
473 L. Joint PVC dia. 6"
474 L. Joint PVC dia. 4"
475 Las Boch GIP dia. 3" SGP
476 Las Boch GIP dia. 3" SCH
477 T Joint PVC dia. 6"
478 T Joint PVC dia. 4"
479 T Joint GIP dia. 3"
480 Flens Adaptor PVC dia. 6"
481 Flens Adaptor PVC dia. 4"
482 Flens Adaptor GIP dia. 3"
483 Flens Adaptor GIP dia. 4"
484 Reducer PVC 4" - 6"
485 Reducer GIP 3" - 4"
486 Alva Valve dia. 6"
487 Gate Valve Onda 1/2" kuningan 1/2"
488 Gate Valve Onda 1" kuningan 1"
489 Gate Valve Onda 1,5" kuningan 1,5"
490 Gate Valve Onda 2" kuningan 2"
491 Gate Valve Onda 3" Kuningan 3"
492 Gate Valve Onda 4"
493 Knee GI 3"
494 Knee PVC 1/2"
495 Knee PVC 1"
496 Knee GI 2"
497 Kran air Onda Dia 1/2"
498 Mur baut 5/8" x 3"
499 Packing karet 1.5"
500 Packing karet 2"
501 Packing karet 3"
NO URAIAN KETERANGAN

502 Plug Kran PVC Ø 1/2"


503 Air Valve Single dia. 2"
504 Air Valve Single dia. 3/4"
505 Clamp Sadle dia 4"
506 Water Meter Air (SNI / TERA) Kuningan Ø 1/2"
507 Water Level Control (WLC)
534 Bambu Bongkotan Dia 12 cm x 6 m
535 Kayu Bekesting (meranti)
536 Kayu Glugu / pohon kelapa
537 Kayu Perancah
NO URAIAN KETERANGAN

538 Kayu Jati Balok 8 x 12 x 400cm


539 Kayu Jati Kaso 5 x 7 x 400cm
540 Kayu Jati Papan 2 x 20 x 400cm
541 Kayu Jati Reng 2 x 3 x 400cm
542 Kayu Jati Reng 3 x 5 x 400cm
543 Kayu Kamper Balok 6 x 12 x 400cm
544 Kayu Kamper Kaso 5 x 7 x 400cm
545 Kayu Kamper Papan 2 x 20 x 400cm
546 Kayu Kamper Reng 2 x 3 x 400cm
547 Kayu Kruing Balok 6 x 12 x 400cm
548 Kayu Kruing Kaso 5 x 7 x 400cm
549 Kayu Meranti Balok 6 x 12 x 400Cm
550 Kayu Meranti Kaso 5 x 7 x 400Cm
551 Kayu Meranti Papan 2 x 20 x 400Cm
552 Kayu Meranti Reng 2 x 3 x 400Cm
553 Kayu Multipleks (0,9 x 122 x 244)cm
554 Kayu Plywood 122x244x4 mm
555 Kayu Teakwood (0,4 x 110 x 210) cm
556 Kayu Teakwood (0,4 x 122 x 244) cm
557 Kayu Tripleks (0,3 x 122 x 244)cm
558 Kayu Tripleks (0,4 x 122 x 244)cm
559 Waterproofing No Drop, 1 Kg
560 Cat Genteng, Sanlek
561 Cat Kayu / Emco
562 Cat Besi/emco
563 Cat Meni Besi, Pedang
564 Cat Minyak Cat, Avian
565 Cat Minyak Cat, Biasa
566 Cat Plamur Kayu, Cap Pedang
567 Cat Politur jadi
568 Cat Shanding
569 Cat Teer
570 Cat Catylac
571 Cat Tembok Decholite (5 Kg)
572 Cat Tembok Interior Dulux Khusus
NO URAIAN KETERANGAN

573 Cat Tembok Interior Dulux standar


574 Cat Tembok, Paragon
575 Cat Tembok, Paragon (5 Kg)
576 Cat Thinner A Special
577 Cat Thinner B
578 Cat Wood Filler
579 Cat Tembok Eksterior Dulux ( Standar )
580 Cat Tembok Eksterior Dulux ( Khusus )
581 Cat Tembok Dasar Alkali, Interior Dulux
582 Cat Jotun Eksterior Jotashield
583 Cat Woodstain
NO URAIAN KETERANGAN

584 Cat Melamic


Paving conblock ( Corso ) Abu. Uk. 21 x 21 x 6 cm ex. Focon
Paving conblock ( Corso ) Warna. Uk. 21 x 21 x 6 cm ex. Focon ( Merah, Hijau,
640 Paving conblock ( Corso ) Abu. Uk. 21 x 21 x 8 cm ex. Focon
641 Paving conblock ( Corso ) Warna. Uk. 21 x 21 x 8 cm ex. Focon ( Merah, Hijau,
642 Kanstein 10.20.40 uk. 10 x 40 x 20 cm ex. Focon
643 Kanstein 15/20.30.50 uk. 15 x 50 x 30 cm ex. Focon
644 Grass Block uk. 21.5 x 42 cm, Tebal 10 ex. Focon
645 Topi Uskup Besar 20.35 x 29.7 cm Tebal 8 cm ex. Focon
646 Topi Uskup Besar 20.35 x 29.7 cm Tebal 8 cm ex. Calvary
647 Paving conblock ( Corso ) Abu. Uk. 21 x 21 x 8 cm ex. Conblock
648 Paving conblock ( Corso ) Warna. Uk. 21 x 21 x 8 cm ex. Conblock ( Merah, Hija
649 Kansetin 10.20.40 uk. 10 x 40 x 20 cm ex. Conblock
650 Kantein 15.30.50 uk. 15 x 50 x 30 cm ex. Conblock
651 Grass Block uk. 21.5 x 42 cm, Tebal 10 ex. Conblock
652 Topi Uskup Besar 20.35 x 29.7 cm Tebal 6 cm ex. Conblock
653 Topi Uskup Besar 20.35 x 29.7 cm Tebal 8 cm ex. Conblock
654 Topi Uskup Kecil 10.4 x 14.7 cm Tebal 6 cm ex. Conblock
655 Topi Uskup Kecil 10.4 x 14.7 cm Tebal 8 cm ex. Conblock
656 Paving Stone ( Lokal ) Tebal 6cm Kw 1,abu-abu
657 Paving Stone ( Lokal ) Tebal 8cm Kw 1, abu-abu
658 Grass Block ( Lokal ) Tebal 6
659 Kanstin ( Lokal ) Uk. 40 x18 x 10 cm
660 Kanstin ( Lokal ) Uk. 50 x 35 x 15 cm
661 Topi Uskup KW 1 tebal 6 cm
662 Topi Uskup KW 1 tebal 8 cm
BAHAN KONSTRUKSI 2019

SAT. HARGA

buah 750
buah 8,750
m3 156,100
m3 258,200
m3 262,900
m3 252,950
m3 236,200
m3 235,000
m3 233,600
m3 310,000
m3 310,000
m3 134,150
m3 75,000
m3 210,000
m3 89,600
Kg 10,500
Kg 10,250
Kg 11,250
Ton 2,500
Liter 12,150
Liter 9,500
Liter 5,750
Liter 25,000
m2 3,750
Kg 36,900
Zak 58,000
Zak 57,000
Zak 48,500
Zak 44,300
Kg 14,500
Kg 10,050
Kg 11,200
SAT. HARGA

Kg 18,000
m 15,000
Kg 17,450
m2 145,000
m2 110,500
Kg 13,200
Kg 13,000
Kg 12,750
Kg 12,650
SAT. HARGA

Batang 33,750
Batang 25,300
Batang 107,500
Batang 85,000
Batang 147,000
Batang 187,500
Batang 315,000
Batang 250,000
Batang 102,500
Batang 125,000
Batang 148,000
Batang 230,000
Batang 300,000
Batang 365,000
Batang 470,000
Batang 685,000
Batang 890,000
Lembar 420,000
btg 115,000
btg 165,000
btg 84,000
btg 115,000
btg 34,000
79,000
115,000
btg 52,000
35,200
Biji 2,100
Biji 4,750
6,000
9,000
Biji 13,800
Biji 10,000
Biji 11,000
Biji 6,550
SAT. HARGA

Biji 14,500
Biji 33,750
Biji 20,000
Biji survei ulang
m2 79,900
m2 95,100
m2 105,900
m1 4,250
m1 104,650
m1 103,000
m1 107,700
m1 120,000
m1 63,700
SAT. HARGA

lembar 650,000
roll 57,500
Buah 5,000
Buah 5,000
Lembar 70,000
Lembar 17,500
Lembar 73,900
Buah 158,100
Buah 2,400,000
Buah 1,500,000
60,000
Buah 371,400
Buah 985,000
Buah 250,000
230,500
307,400
163,800
208,300
238,800
93,000
103,000
95,000
105,000
160,000
125,000
130,000
102,000
m2 55,000
m2 56,000
m2 49,000
m2 59,000
m2 50,000
m2 44,300
m2 50,600
m1 50,000
SAT. HARGA

m2 60,450
m2 111,500
Kg 14,350
Kg 8,150
SAT. HARGA

Botol 10,950
m2 225,000
m2 265,000
300,000
265,000
300,000
335,000
450,000
250,000
275,000
315,000
365,000
400,000
465,000
225,000
235,000
265,000
325000
m1 218,100
m2 161,000
m2 230,600
m2 312,850
m2 94,500
m2 126,000
m2 90,500
m2 121,200
m2 142,100
m2 151,050
buah 1,189,900
buah 2,172,900
m2 640,000
765,000
m2 1,110,000
Buah 4,500
m2 143,750
SAT. HARGA

m2 178,000
m2 185,000
Biji 15,000
Biji 8,450
m2 143,350
m2 149,650
SAT. HARGA

Lembar 79,050
Lembar 105,400
Lembar 71,500
Lembar 139,700
Stel 26,500
m1 192,000
meter 52,000
Biji 40,600
Biji 48,500
Biji 63,250
Biji 79,000
biji 94,850
Biji 67,500
Biji 115,950
Biji 73,800
Biji 140,000
Biji 121,200
Biji 168,650
Biji 23,200
Biji 25,200
Biji 35,750
Biji 38,150
Biji 42,200
kg 22,150
kg 15,850
buah 1,000
buah 250
Set 1,300,000
Set 198,450
buah 350
Lembar 98,350
Lembar 70,000
Lembar 54,400
Lembar 95,000
Lembar 58,000
SAT. HARGA

Lembar 72,500
m2 485,000
m2 500,000
m2 600,000
m2 675,000
SAT. HARGA

m2 400,000
m2 450,000
m2 800,000
Buah 1,129,300
Kotak 22,700
Kotak 36,900
Kotak 20,000
Pasang 33,300
Buah 10,550
Buah 6,350
Buah 75,000
Buah 54,500
Buah 175,000
Buah 77,700
Buah 402,300
Buah 79,050
Buah 49,500
Pasang 125,000
set 10,350
set 21,100
set 18,100
Set 35,000
Set 90,650
Set 186,300
Set 126,500
Set 158,100
Buah 137,000
m 10,450
m 40,500
m 12,500
m 15,000
m 25,000
m 36,000
m 45,000
Bh 273,300
SAT. HARGA

Bh 391,400
m 650,000
Buah 35,000
Unit 81,950
Unit 114,750
SAT. HARGA

Buah 39,350
Buah 41,550
Unit 327,750
Unit 273,100
Unit 665,500
Unit 431,200
Unit 661,600
Unit 387,400
Unit 310,600
Unit 195,700
Unit 20,000
Buah 14,950
Buah 10,950
Buah 3,600
Buah 211,400
75,000
250,000
350,000
m' 11,200
Batang 127,500
Batang 97,920
Batang 46,120
Batang 69,180
Batang 65,280
Batang 85,000
Batang 30,040
Batang 45,060
Batang 1,551,960
Batang 243,120
Batang 126,200
Batang 231,120
Batang 31,650
Batang 336,920
Batang 531,440
Batang 797,160
SAT. HARGA

Batang 702,320
Batang 1,092,320
Batang 1,638,480
Batang 31,950
Batang 45,400
Batang 26,650
Batang 37,900
Batang 21,100
Batang 30,000
Batang 64,200
SAT. HARGA

Batang 91,350
Batang 50,000
Batang 72,100
Batang 74,550
Batang 106,080
Batang 14,350
Batang 20,400
Batang 95,000
Batang 136,700
Batang 7,900
Batang 11,200
Batang 133,860
Batang 69,180
Batang 61,020
Batang 40,680
Batang 46,120
Batang 1,114,920
Batang 1,672,380
Batang 1,519,600
Batang 2,279,400
Batang 60,280
Batang 90,420
Batang 89,240
Batang 129,480
Batang 194,220
Batang 182,080
Batang 273,120
Batang 297,400
Batang 446,100
Batang 361,240
Batang 541,860
Batang 638,880
Batang 958,320
Batang 21,640
Batang 57,750
SAT. HARGA

Batang 57,750
Batang 51,580
Batang 88,950
Batang 88,950
Batang 121,450
SAT. HARGA

Batang 2,174,150
Batang 2,174,150
Batang 2,964,250
Batang 141,150
Batang 141,150
Batang 196,200
Batang 200,400
Batang 200,400
Batang 279,950
Batang 284,200
Batang 284,200
Batang 396,000
Batang 32,490
Batang 417,500
Batang 417,550
Batang 571,800
Batang 855,600
Batang 855,600
Batang 1,154,500
Batang 880,900
Batang 880,900
Batang 1,202,000
Batang 1,362,200
Batang 1,362,200
Batang 1,885,100
Batang 1,400,600
Batang 1,400,600
Batang 1,947,200
Batang 120,000
Batang 170,000
Batang 230,000
Batang 250,000
Batang 300,000
Batang 400,000
Batang 500,000
SAT. HARGA

Batang 650,000
Batang 800,000
Batang 1,400,000
Batang 150,000
Batang
203,150
Batang 300,000
311,450
Batang 380,000
411,100
Batang 450,000
472,300
SAT. HARGA

Batang 550,000
Batang 800,000
Batang 900,000
1,061,800
Batang 1,500,000
1,537,200
Batang 2,000,000
Batang 2,462,800
Batang 305,450
Batang 357,200
Batang 426,050
Batang 651,600
Kg ###
6,000
Buah 30,000
Buah 40,000
Buah 120,000
Buah 220,000
Buah 850,000
Buah 450,000
Buah 230,000
Buah 170,000
Buah 100,000
Buah 5,000
Buah
Buah 200,000
Buah 150,000
Buah 80,000
Buah 15,000
Buah 200,000
Buah 150,000
Buah 80,000
Buah 40,000
Buah 35,000
Buah 350,000
SAT. HARGA

Buah 750,000
Buah 26,000
Buah 20,000
Buah 17,500
Buah 17,800
Buah 75,000
Buah 30,000
SAT. HARGA

Buah 20,000
Buah 5,000
Buah 7,000
Buah 15,000
Buah 20,000
Buah 25,000
Buah 3,000
Buah 10,000
Buah 30,000
Buah 35,000
Buah 50,000
Buah 60,000
Buah 80,000
Buah 130,000
Buah 200,000
380,000
225,000
Buah 175,000
Buah 115,000
Buah 40,000
Buah 400,000
Buah 500,000
700,000
1,000,000
Buah 50,000
Buah 86,400
Buah 250,000
Buah 230,000
Buah 180,000
Buah 150,000
Buah 80,000
Buah 45,000
Buah 21,800
Buah 15,000
Buah 1,500
SAT. HARGA

Buah 2,450
Buah 2,150
Buah 400,000
Buah 230,000
Buah 150,000
Buah 50,000
Buah 6,000
SAT. HARGA

Buah 225,000
Buah 215,000
Buah 200,000
Buah 350,000
500,000
Buah 1,700
Buah 104,000
Buah 40,000
Buah 75,000
125,000
Buah 104,000
Buah 34,000
Buah 150,000
Buah 200,000
Buah 100,000
Buah 80,000
Buah 130,000
Buah 66,650
Buah 82,400
Buah 760,000
Buah 78,750
Buah 190,000
Buah 367,250
Buah 524,250
Buah 1,522,000
2,867,250
Buah 120,000
1,500
4,000
Buah 42,500
Buah 23,000
Buah 7,000
7,500
Buah 10,000
Buah 15,000
SAT. HARGA

Buah 12,700
Buah 450,000
Buah 200,000
Buah 26,500
Buah 350,000
Buah 150,000
Batang 20,800
m3 3,688,450
m3 2,700,000
3,321,000
SAT. HARGA

m3 15,625,000
m3 8,570,000
m3 18,009,150
m3 6,250,000
m3 6,750,000
m3 10,000,000
m3 7,855,000
m3 9,772,350
m3 8,430,650
m3 7,113,400
m3 6,849,900
m3 5,676,050
m3 5,638,000
m3 5,865,350
m3 5,269,150
Lembar 95,000
Lembar 101,200
Lembar 114,700
Lembar 132,800
Lembar 52,700
Lembar 68,000
Kaleng 49,450
Galon 180,450
Kg 61,150
Kg 62,125
Kg 29,750
Liter 28,000
Liter 12,350
Kg 28,500
Liter 42,700
Kg 58,000
Kg 15,200
5Kg 121,200
Galon 105,000
Liter 185,000
SAT. HARGA

Liter 147,550
Kg 23,950
Galon 97,500
Liter 28,600
Liter 13,200
Kg 39,400
Liter 234,500
Liter 253,200
Liter 108,050
Kg 112,500
77,500
SAT. HARGA

55,250
m2 96,800
m2 108,800
m2 115,500
m2 143,000
m1 64,550
m1 117,200
m2 143,000
m2
m2
m2 101,800
m2
m1
m1 84,000
m2
m2
m2
m2
m2
m2 65,000
m2 75,000
Buah 19,000
bh 14,000
bh 30,000
bh 5,500
bh 7,000
DAFTAR UPAH TENAGA KERJA

NO NAMA TENAGA KERJA SATUAN HARGA

1 2 3 4
1 Kepala Tukang OH 95,000.00
2 Kepala Tukang Batu OH 95,000.00
3 Kepala Tukang Besi OH 95,000.00
4 Kepala Tukang Cat OH 95,000.00
5 Kepala Tukang Gali Tanah OH 95,000.00
6 Kepala Tukang Kayu OH 95,000.00
7 Kepala Tukang Listrik OH 95,000.00
8 Kepala Tukang Pipa OH 95,000.00
9 Kepala Tukang Sapu OH 95,000.00
16 Mandor OH 100,000.00
17 Operator OH 90,000.00
18 Operator alat berat OH 90,000.00
20 Pekerja OH 70,000.00
21 Pekerja Terampil OH 75,000.00
22 Pemasak aspal OH 75,000.00
23 Pembantu Operator OH 75,000.00
25 Pembantu Sopir OH 75,000.00
26 Pengemudi / Sopir OH 90,000.00
29 Tukang Batu OH 90,000.00
30 Tukang Besi OH 90,000.00
31 Tukang Cat OH 90,000.00
32 Tukang Erection OH 90,000.00
33 Tukang Gali Jalan OH 90,000.00
34 Tukang Gali Lumpur OH 90,000.00
35 Tukang Gali Tanah OH 90,000.00
36 Tukang Kayu OH 90,000.00
38 Tukang Las OH 90,000.00
40 Tukang Listrik OH 90,000.00
41 Tukang Pipa OH 90,000.00
DAFTAR SEWA PERALTAN YANG DISURVEI

NO URAIAN
KETERANGAN SAT. CV BUDI LUHUR

1 Waterpas
UNIT / HARI
2 theodolith
UNIT / HARI
3 Jack Hammer
UNIT / HARI
4 Excavator
UNIT / HARI
5 Pompa Lumpur
UNIT / HARI 175,000.00
6 Stamper
UNIT / HARI
7 Molen
UNIT / HARI 140,000.00
8 Palu / Bodem
BH
9 Pahat Beton
BH
10 Linggis
BH
11 Tripot Tinggi 5 m
UNIT / HARI
12 Alat Pancang + hammer 0.5
UNIT / HARI
ton
13 Mesin Potong Rumput
UNIT / HARI
14 Concrete Pump
UNIT / HARI
15 Vibrator beton 4 HP
UNIT / HARI
16 Gergaji Besi
BH
17 Pompa air 70 -100 ml
UNIT / HARI
18 drilling Rig Borehole diameter
M 225,000.00
8 3/4"
19 Drilling Rig
M 300,000.00
20 Geolistrik
UNIT / HARI
21 Gergaji Listrik
UNIT / HARI
22 Gerindra
UNIT / HARI
23 Generator set 5 Kw
UNIT / HARI
24 Mesin Las Listrik 250A, Diesel
UNIT / HARI 525,000.00
*
25 Sewa Welding Set (min 5 jam)
JAM
26 Sewa alat bantu strouss pile
UNIT / HARI 210,000.00
27 Timbris
UNIT / HARI
28 Kereta Dorong
UNIT / HARI
29 Ganco
BH
30 Keranjang
BH
CV rong cuyu

480,000.00

450,000.00

350,000.00

200,000.00

3,500,000.00

78,000.00

300,000.00

80,000.00

420,000.00
- 141 SATUAN
HARGA - POKOK KEGIATAN TAHUN 2018
III. BIDANG TATA RUANG DAN BANGUNAN GEDUNG

NOMOR URAIAN KEGIATAN Koef. SATUAN

BANGUNAN GEDUNG
Pekerjaan Persiapan & Tanah
A Pekerjaan Persiapan
3 Pengukuran dan pemasangan bowplank m1
Tenaga:
Mandor 0.0050 O.H
Kepala Tukang Kayu 0.0100 O.H
Tukang Kayu 0.1000 O.H
Pekerja 0.1000 O.H
Bahan:
Meranti Papan 2 x 20 x 400 cm 0.0070 m3
Kayu Meranti Kaso 5/7 0.0120 m3
Paku biasa 2" - 3" 0.0200 kg
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
B Pekerjaan Tanah
1 Galian tanah biasa sedalam 1 meter m3
Tenaga:
Mandor 0.0250 O.H
Pekerja 0.7500 O.H
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
7 Pengurugan kembali galian tanah m3
Tenaga:
Mandor 0.0500 O.H
Pekerja 0.5000 O.H
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
9 Pengurugan dengan Pasir Urug m3
Tenaga:
Mandor 0.0100 O.H
Pekerja 0.3000 O.H
- 142 -
NOMOR URAIAN KEGIATAN Koef. SATUAN

Bahan:
Pasir Urug 1.2000 m3
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
12 Timbunan Tanah dari Luar dipadatkan dengan cara m3
mekanis
Tenaga:
Mandor 0.0156 O.H
Pekerja 0.0778 O.H
Bahan:
Tanah Urug 1.2000 m3
Peralatan:
Bulldozer 0.0180 Jam
Vibrator Roller ( 8 T ) 0.0178 Jam
Water Tank Truck 0.0078 Jam
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
17 Pembuatan lubang strouss pile diameter 30 cm m1
Tenaga:
Mandor 0.0240 O.H
Pekerja 0.4800 O.H
Peralatan:
Sewa alat bantu strouss pile 0.4000 jam
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
SATUAN POKOK KEGIATAN TAHUN 2018 - 143 -

NGUNAN GEDUNG

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 500.00
Rp 95,000.00 Rp 950.00
Rp 90,000.00 Rp 9,000.00
Rp 70,000.00 Rp 7,000.00

Rp 5,865,350.00 Rp 41,057.45
Rp 5,638,000.00 Rp 67,656.00
Rp 15,850.00 Rp 317.00
Jumlah Rp 126,480.45
Overhead + Profit ( 10 % ) Rp 12,648.05
Nilai HSPK : Rp 139,128.50

Rp 100,000.00 Rp 2,500.00
Rp 70,000.00 Rp 52,500.00
Jumlah Rp 55,000.00
Overhead + Profit ( 10 % ) Rp 5,500.00
Nilai HSPK : Rp 60,500.00

Rp 100,000.00 Rp 5,000.00
Rp 70,000.00 Rp 35,000.00
Jumlah Rp 40,000.00
Overhead + Profit ( 10 % ) Rp 4,000.00
Nilai HSPK : Rp 44,000.00

Rp 100,000.00 Rp 1,000.00
Rp 70,000.00 Rp 21,000.00
HARGA - 144 -
HARGA
SATUAN

Rp 134,150.00 Rp 160,980.00
Jumlah Rp 182,980.00
Overhead + Profit ( 10 % ) Rp 18,298.00
Nilai HSPK : Rp 201,278.00

Rp 100,000.00 Rp 1,560.00
Rp 70,000.00 Rp 5,446.00

Rp 75,000.00 Rp 90,000.00

Rp 162,250.00 Rp 2,920.50
Rp 313,800.00 Rp 5,585.64
Rp 345,800.00 Rp 2,697.24
Jumlah Rp 108,209.38
Overhead + Profit ( 10 % ) Rp 10,820.94
Nilai HSPK : Rp 119,030.32

Rp 100,000.00 Rp 2,400.00
Rp 70,000.00 Rp 33,600.00

Rp 16,500.00 Rp 6,600.00
Jumlah Rp 42,600.00
Overhead + Profit ( 10 % ) Rp 4,260.00
Nilai HSPK : Rp 46,860.00
-7-

URAIAN KEGIATAN Koef.


NOMOR SATUAN

C Pekerjaan Pondasi
Pekerjaan Pondasi
1 Pasangan Batu Kali Belah 15/20 cm (1 SP : 6 PP) m3
Tenaga:
Mandor 0.0750 O.H
Kepala Tukang Batu 0.0750 O.H
Tukang Batu 0.7500 O.H
Pekerja 1.5000 O.H
Bahan:
Semen portland 117.0000 kg
Pasir Pasang 0.5610 m3
Batu Kali Pecah 15/20 cm 1.2000 m3
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
2 Pemasangan Batu Kali Belah Kosongan m3
Tenaga:
Mandor 0.0390 O.H
Kepala Tukang Batu 0.0390 O.H
Tukang Batu 0.3900 O.H
Pekerja 0.7800 O.H
Bahan:
Batu Kali Pecah 15/20 cm 1.2000 m3
Pasir urug 0.4320 m3
Jumlah
Overhead + Profit ( 10 %
Nilai HSPK :
-8-

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 7,500.00
Rp 95,000.00 Rp 7,125.00
Rp 90,000.00 Rp 67,500.00
Rp 70,000.00 Rp 105,000.00

Rp 1,212.50 Rp 141,862.50
Rp 310,000.00 Rp 173,910.00
Rp 156,100.00 Rp 187,320.00
Jumlah Rp 690,217.50
Overhead + Profit ( 10 % ) Rp 69,021.75
Nilai HSPK : Rp 759,239.25

Rp 100,000.00 Rp 3,900.00
Rp 95,000.00 Rp 3,705.00
Rp 90,000.00 Rp 35,100.00
Rp 70,000.00 Rp 54,600.00

Rp 156,100.00 Rp 187,320.00
Rp 134,150.00 Rp 57,952.80
Jumlah Rp 342,577.80
Overhead + Profit ( 10 % ) Rp 34,257.78
Nilai HSPK : Rp 376,835.58
9

NOMOR URAIAN KEGIATAN Koef. SATUAN

Struktur Utama
D Pekerjaan Beton
1 Pasang bekisting untuk sloof Bahan Kayu dipakai 2 kali m2
Tenaga:
Mandor 0.0260 O.H
Kepala Tukang Kayu 0.0260 O.H
Tukang Kayu 0.2600 O.H
Pekerja 0.5200 O.H
Bahan:
Kayu Meranti ( Kayu Kelas III ) 0.0225 m3
Paku biasa 2"-5" 0.3000 Kg
Minyak Bekesting 0.1000 Ltr
Jumlah
Overhead + Profit (
Nilai HSPK :
2 Pasang bekisting untuk kolom Bahan Kayu dipakai 2 kali m2
Tenaga:
Mandor 0.0330 O.H
Kepala Tukang Kayu 0.0330 O.H
Tukang Kayu 0.3300 O.H
Pekerja 0.6600 O.H
Bahan:
Kayu Meranti ( Kayu Kelas III ) 0.0200 m3
Paku biasa 2"-5" 0.4000 Kg
Minyak Bekesting 0.2000 Ltr
Glugu 0.0075 m3
Multipleks tebal 9 mm 0.1750 Lembar
Bambu 1.0000 Batang
Jumlah
Overhead + Profit (
Nilai HSPK :
3 Pasang bekisting untuk balok Bahan Kayu dipakai 2 kali m2
Tenaga:
Mandor 0.0330 O.H
Kepala Tukang Kayu 0.0330 O.H
Tukang Kayu 0.3300 O.H
Pekerja 0.6600 O.H
Bahan:
10

NOMOR URAIAN KEGIATAN Koef. SATUAN

Kayu Meranti ( Kayu Kelas III ) 0.0200 m3


Paku biasa 2"-5" 0.4000 Kg
Minyak Bekesting 0.2000 Ltr
Glugu 0.0090 m3
Multipleks tebal 9 mm 0.1750 Lembar
Bambu 1.0000 Batang
Jumlah
Overhead + Profit (
Nilai HSPK :
4 Pasang bekisting untuk plat lantai Bahan Kayu dipakai 2 kali m2
Tenaga:
Mandor 0.0330 O.H
Kepala Tukang Kayu 0.0330 O.H
Tukang Kayu 0.3300 O.H
Pekerja 0.6600 O.H
Bahan:
Kayu Meranti ( Kayu Kelas III ) 0.0200 m3
Paku biasa 2"-5" 0.4000 Kg
Minyak Bekesting 0.2000 Ltr
Glugu 0.0075 m3
Multipleks tebal 9 mm 0.1750 Lembar
Bambu 3.0000 Batang
Jumlah
Overhead + Profit (
Nilai HSPK :
11

NOMOR URAIAN KEGIATAN Koef. SATUAN

5 Pasang bekisting untuk kolom praktis, balok latai dan ring balk m2
Bahan Kayu dipakai 3 kali
Tenaga:
Mandor 0.0260 O.H
Kepala Tukang Kayu 0.0260 O.H
Tukang Kayu 0.2600 O.H
Pekerja 0.5200 O.H
Bahan:
Kayu Meranti ( Kayu Kelas III ) 0.0150 m3
Paku biasa 2"-5" 0.3000 Kg
Minyak Bekesting 0.1000 Ltr
Jumlah
Overhead + Profit (
Nilai HSPK :
6 Pembesian dengan besi polos Kg
Tenaga:
Mandor 0.0004 O.H
Kepala Tukang Besi 0.0007 O.H
Tukang Besi 0.0070 O.H
Pekerja 0.0070 O.H
Bahan:
Besi Beton Polos 1.0500 Kg
Kawat Beton 0.0150 Kg
Jumlah
Overhead + Profit (
Nilai HSPK :
17 Pembesian dengan besi Ulir Kg
Tenaga:
Mandor 0.0004 O.H
Kepala Tukang Besi 0.0007 O.H
Tukang Besi 0.0070 O.H
Pekerja 0.0070 O.H
Bahan:
Besi Beton Ulir 1.0500 Kg
Kawat Beton 0.0150 Kg
Jumlah
Overhead + Profit (
Nilai HSPK :
12

NOMOR URAIAN KEGIATAN Koef. SATUAN

18 Pegecoran Beton Mutu f'c = 7,4 MPa ( K 100 ) m3


Tenaga:
Mandor 0.0830 O.H
Kepala Tukang Batu 0.0280 O.H
Tukang Batu 0.2750 O.H
Pekerja 1.6500 O.H
Bahan:
Semen portland 247.0000 kg
Pasir Beton 869.0000 kg
Batu Pecah Mesin 2/3 999.0000 kg
Air 215 Ltr
Jumlah
Overhead + Profit (
Nilai HSPK :
19 Pegecoran Beton Mutu f'c = 9,8 MPa ( K 125 ) m3
Tenaga:
Mandor 0.0830 O.H
Kepala Tukang Batu 0.0280 O.H
Tukang Batu 0.2750 O.H
Pekerja 1.6500 O.H
Bahan:
Semen portland 276.0000 kg
Pasir Beton 828.0000 kg
Batu Pecah Mesin 2/3 1,012.0000 kg
Air 215 Ltr
Jumlah
Overhead + Profit (
Nilai HSPK :
20 Pegecoran Beton Mutu f'c = 12,2 MPa ( K 150 ) m3
Tenaga:
Mandor 0.0830 O.H
Kepala Tukang Batu 0.0280 O.H
Tukang Batu 0.2750 O.H
Pekerja 1.6500 O.H
Bahan:
Semen portland 299.0000 kg
Pasir Beton 799.0000 kg
13

NOMOR URAIAN KEGIATAN Koef. SATUAN

Batu Pecah Mesin 2/3 1,017.0000 kg


Air 215 Ltr
Jumlah
Overhead + Profit (
Nilai HSPK :
21 Pegecoran Lantai Kerja Beton Mutu f'c = 7,4 MPa ( K 100 ) m3
Tenaga:
Mandor 0.0600 O.H
Kepala Tukang Batu 0.0200 O.H
Tukang Batu 0.2000 O.H
Pekerja 1.2000 O.H
Bahan:
Semen portland 230.0000 kg
Pasir Beton 893.0000 kg
Batu Pecah Mesin 2/3 1,027.0000 kg
Air 200 Ltr
Jumlah
Overhead + Profit (
Nilai HSPK :
7 Pegecoran Beton Mutu f'c = 14,5 MPa ( K 175 ) m3
Tenaga:
Mandor 0.0830 O.H
Kepala Tukang Batu 0.0280 O.H
Tukang Batu 0.2750 O.H
Pekerja 1.6500 O.H
Bahan:
Semen portland 326.0000 kg
Pasir Beton 760.0000 kg
Batu Pecah Mesin 2/3 1,029.0000 kg
Air 215 Ltr
Jumlah
Overhead + Profit (
Nilai HSPK :
8 Pegecoran Beton Mutu f'c = 19,3 MPa ( K 225 ) m3
Tenaga:
Mandor 0.0830 O.H
Kepala Tukang Batu 0.0280 O.H
14

NOMOR URAIAN KEGIATAN Koef. SATUAN

Tukang Batu 0.2750 O.H


Pekerja 1.6500 O.H
Bahan:
Semen portland 371.0000 kg
Pasir Beton 698.0000 kg
Batu Pecah Mesin 2/3 1,047.0000 kg
Air 215 Ltr
Jumlah
Overhead + Profit (
Nilai HSPK :
15

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 2,600.00
Rp 95,000.00 Rp 2,470.00
Rp 90,000.00 Rp 23,400.00
Rp 70,000.00 Rp 36,400.00

Rp 3,688,450.00 Rp 82,990.13
Rp 15,850.00 Rp 4,755.00
Rp 5,750.00 Rp 575.00
Jumlah Rp 153,190.13
Overhead + Profit ( 10 % ) Rp 15,319.01
Nilai HSPK : Rp 168,509.14

Rp 100,000.00 Rp 3,300.00
Rp 95,000.00 Rp 3,135.00
Rp 90,000.00 Rp 29,700.00
Rp 70,000.00 Rp 46,200.00

Rp 3,688,450.00 Rp 73,769.00
Rp 15,850.00 Rp 6,340.00
Rp 5,750.00 Rp 1,150.00
Rp 2,700,000.00 Rp 20,250.00
Rp 95,000.00 Rp 16,625.00
Rp 20,800.00 Rp 20,800.00
Jumlah Rp 221,269.00
Overhead + Profit ( 10 % ) Rp 22,126.90
Nilai HSPK : Rp 243,395.90

Rp 100,000.00 Rp 3,300.00
Rp 95,000.00 Rp 3,135.00
Rp 90,000.00 Rp 29,700.00
Rp 70,000.00 Rp 46,200.00
16

HARGA
HARGA
SATUAN
Rp 3,688,450.00 Rp 73,769.00
Rp 15,850.00 Rp 6,340.00
Rp 5,750.00 Rp 1,150.00
Rp 2,700,000.00 Rp 24,300.00
Rp 95,000.00 Rp 16,625.00
Rp 20,800.00 Rp 20,800.00
Jumlah Rp 225,319.00
Overhead + Profit ( 10 % ) Rp 22,531.90
Nilai HSPK : Rp 247,850.90

Rp 100,000.00 Rp 3,300.00
Rp 95,000.00 Rp 3,135.00
Rp 90,000.00 Rp 29,700.00
Rp 70,000.00 Rp 46,200.00

Rp 3,688,450.00 Rp 73,769.00
Rp 15,850.00 Rp 6,340.00
Rp 5,750.00 Rp 1,150.00
Rp 2,700,000.00 Rp 20,250.00
Rp 95,000.00 Rp 16,625.00
Rp 20,800.00 Rp 62,400.00
Jumlah Rp 262,869.00
Overhead + Profit ( 10 % ) Rp 26,286.90
Nilai HSPK : Rp 289,155.90
17

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 2,600.00
Rp 95,000.00 Rp 2,470.00
Rp 90,000.00 Rp 23,400.00
Rp 70,000.00 Rp 36,400.00

Rp 3,688,450.00 Rp 55,326.75
Rp 15,850.00 Rp 4,755.00
Rp 5,750.00 Rp 575.00
Jumlah Rp 125,526.75
Overhead + Profit ( 10 % ) Rp 12,552.68
Nilai HSPK : Rp 138,079.43

Rp 100,000.00 Rp 40.00
Rp 95,000.00 Rp 66.50
Rp 90,000.00 Rp 630.00
Rp 70,000.00 Rp 490.00

Rp 10,050.00 Rp 10,552.50
Rp 18,000.00 Rp 270.00
Jumlah Rp 12,049.00
Overhead + Profit ( 10 % ) Rp 1,204.90
Nilai HSPK : Rp 13,253.90

Rp 100,000.00 Rp 40.00
Rp 95,000.00 Rp 66.50
Rp 90,000.00 Rp 630.00
Rp 70,000.00 Rp 490.00

Rp 11,200.00 Rp 11,760.00
Rp 18,000.00 Rp 270.00
Jumlah Rp 13,256.50
Overhead + Profit ( 10 % ) Rp 1,325.65
Nilai HSPK : Rp 14,582.15
18

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 8,300.00
Rp 95,000.00 Rp 2,660.00
Rp 90,000.00 Rp 24,750.00
Rp 70,000.00 Rp 115,500.00

Rp 1,212.50 Rp 299,487.50
Rp 221.43 Rp 192,421.43
Rp 187.37 Rp 187,183.00
Rp 100.00 Rp 21,500.00
Jumlah Rp 851,801.93
Overhead + Profit ( 10 % ) Rp 85,180.19
Nilai HSPK : Rp 936,982.12

Rp 100,000.00 Rp 8,300.00
Rp 95,000.00 Rp 2,660.00
Rp 90,000.00 Rp 24,750.00
Rp 70,000.00 Rp 115,500.00

Rp 1,212.50 Rp 334,650.00
Rp 221.43 Rp 183,342.86
Rp 187.37 Rp 189,618.81
Rp 100.00 Rp 21,500.00
Jumlah Rp 880,321.67
Overhead + Profit ( 10 % ) Rp 88,032.17
Nilai HSPK : Rp 968,353.84

Rp 100,000.00 Rp 8,300.00
Rp 95,000.00 Rp 2,660.00
Rp 90,000.00 Rp 24,750.00
Rp 70,000.00 Rp 115,500.00

Rp 1,212.50 Rp 362,537.50
Rp 221.43 Rp 176,921.43
19

HARGA
HARGA
SATUAN
Rp 187.37 Rp 190,555.67
Rp 100.00 Rp 21,500.00
Jumlah Rp 902,724.60
Overhead + Profit ( 10 % ) Rp 90,272.46
Nilai HSPK : Rp 992,997.05

Rp 100,000.00 Rp 6,000.00
Rp 95,000.00 Rp 1,900.00
Rp 90,000.00 Rp 18,000.00
Rp 70,000.00 Rp 84,000.00

Rp 1,212.50 Rp 278,875.00
Rp 221.43 Rp 197,735.71
Rp 187.37 Rp 192,429.37
Rp 100.00 Rp 20,000.00
Jumlah Rp 798,940.08
Overhead + Profit ( 10 % ) Rp 79,894.01
Nilai HSPK : Rp 878,834.09

Rp 100,000.00 Rp 8,300.00
Rp 95,000.00 Rp 2,660.00
Rp 90,000.00 Rp 24,750.00
Rp 70,000.00 Rp 115,500.00

Rp 1,212.50 Rp 395,275.00
Rp 221.43 Rp 168,285.71
Rp 187.37 Rp 192,804.11
Rp 100.00 Rp 21,500.00
Jumlah Rp 929,074.83
Overhead + Profit ( 10 % ) Rp 92,907.48
Nilai HSPK : Rp 1,021,982.31

Rp 100,000.00 Rp 8,300.00
Rp 95,000.00 Rp 2,660.00
20

HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 24,750.00
Rp 70,000.00 Rp 115,500.00

Rp 1,212.50 Rp 449,837.50
Rp 221.43 Rp 154,557.14
Rp 187.37 Rp 196,176.78
Rp 100.00 Rp 21,500.00
Jumlah Rp 973,281.42
Overhead + Profit ( 10 % ) Rp 97,328.14
Nilai HSPK : Rp 1,070,609.56
- 24 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Pekerjaan Dinding dan Plesteran
F Pekerjaan Dinding dan Plesteran
1 Pemasangan Batu Merah tebal 1/2 bata (1 SP : 3 PP) m2
Tenaga:
Mandor 0.0150 O.H Rp 100,000.00
Kepala Tukang Batu 0.0100 O.H Rp 95,000.00
Tukang Batu 0.1000 O.H Rp 90,000.00
Pekerja 0.3000 O.H Rp 70,000.00
Bahan:
Semen portland 14.3700 kg Rp 1,212.50
Pasir Pasang 0.0400 m3 Rp 310,000.00
Bata Merah uk.5 x 11 x 22 70.00 Buah Rp 750.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
2 Pemasangan Batu Merah tebal 1 bata (1 SP : 5 PP) m2
Tenaga:
Mandor 0.0300 O.H Rp 100,000.00
Kepala Tukang Batu 0.0200 O.H Rp 95,000.00
Tukang Batu 0.2000 O.H Rp 90,000.00
Pekerja 0.6000 O.H Rp 70,000.00
Bahan:
Semen portland 22.2000 kg Rp 1,212.50
Pasir Pasang 0.1020 m3 Rp 310,000.00
Bata Merah uk.5 x 11 x 22 140.00 Buah Rp 750.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
3 Pemasangan Batu Merah tebal 1/2bata (1 SP : 5 PP) m2
Tenaga:
Mandor 0.0150 O.H Rp 100,000.00
Kepala Tukang Batu 0.0100 O.H Rp 95,000.00
Tukang Batu 0.1000 O.H Rp 90,000.00
Pekerja 0.3000 O.H Rp 70,000.00
Bahan:
Semen portland 9.6800 kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
- 25 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Bata Merah uk.5 x 11 x 22 70.0000 Buah Rp 750.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
4 Plesteran 1 SP : 5 PP tebal 15 mm m2
Tenaga:
Mandor 0.0150 O.H Rp 100,000.00
Kepala Tukang Batu 0.0150 O.H Rp 95,000.00
Tukang Batu 0.1500 O.H Rp 90,000.00
Pekerja 0.3000 O.H Rp 70,000.00
Bahan:
Semen portland 5.1840 kg Rp 1,212.50
Pasir Pasang 0.0260 m3 Rp 310,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 26 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
5 Plesteran Benangan Sudut m1
Tenaga:
Mandor 0.00350 O.H Rp 100,000.00
Kepala Tukang Batu 0.00350 O.H Rp 95,000.00
Tukang Batu 0.03500 O.H Rp 90,000.00
Pekerja 0.07000 O.H Rp 70,000.00
Bahan:
Semen portland 0.65000 kg Rp 1,212.50
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
6 Plesteran Ciprat 1 SP : 2 PP m2
Tenaga:
Mandor 0.0150 O.H Rp 100,000.00
Kepala Tukang Batu 0.0100 O.H Rp 95,000.00
Tukang Batu 0.1000 O.H Rp 90,000.00
Pekerja 0.3000 O.H Rp 70,000.00
Bahan:
Semen portland 4.3200 kg Rp 1,212.50
Pasir Pasang 0.0060 m3 Rp 310,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
7 Acian m2
Tenaga:
Mandor 0.0100 O.H Rp 100,000.00
Kepala Tukang Batu 0.0100 O.H Rp 95,000.00
Tukang Batu 0.1000 O.H Rp 90,000.00
Pekerja 0.2000 O.H Rp 70,000.00
Bahan:
Semen portland 3.2500 kg Rp 1,212.50
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 27 -

HARGA

Rp 1,500.00
Rp 950.00
Rp 9,000.00
Rp 21,000.00

Rp 17,423.63
Rp 12,400.00
Rp 52,500.00
Rp 114,773.63
Rp 11,477.36
Rp 126,250.99

Rp 3,000.00
Rp 1,900.00
Rp 18,000.00
Rp 42,000.00

Rp 26,917.50
Rp 31,620.00
Rp 105,000.00
Rp 228,437.50
Rp 22,843.75
Rp 251,281.25

Rp 1,500.00
Rp 950.00
Rp 9,000.00
Rp 21,000.00

Rp 11,737.00
Rp 13,950.00
- 28 -

HARGA

Rp 52,500.00
Rp 110,637.00
Rp 11,063.70
Rp 121,700.70

Rp 1,500.00
Rp 1,425.00
Rp 13,500.00
Rp 21,000.00

Rp 6,285.60
Rp 8,060.00
Rp 51,770.60
Rp 5,177.06
Rp 56,947.66
- 29 -

HARGA

Rp 350.00
Rp 332.50
Rp 3,150.00
Rp 4,900.00

Rp 788.13
Rp 9,520.63
Rp 952.06
Rp 10,472.69

Rp 1,500.00
Rp 950.00
Rp 9,000.00
Rp 21,000.00

Rp 5,238.00
Rp 1,860.00
Rp 39,548.00
Rp 3,954.80
Rp 43,502.80

Rp 1,000.00
Rp 950.00
Rp 9,000.00
Rp 14,000.00

Rp 3,940.63
Rp 28,890.63
Rp 2,889.06
Rp 31,779.69
- 30 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Pekerjaan Lantai
G Pekerjaan Lantai
1 Pasangan lantai keramik motif 20x20 cm m2
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
Semen portland 10.4000 Kg Rp 1,212.50
Semen Nat 0.5000 Kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
Keramik 20x20 cm setara ex. Asia tile 1.0500 doos Rp 55,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
2 Pasangan Dinding keramik 20x25 cm m2
Tenaga:
Mandor 0.0450 O.H Rp 100,000.00
Kepala Tukang Batu 0.0450 O.H Rp 95,000.00
Tukang Batu 0.4500 O.H Rp 90,000.00
Pekerja 0.0900 O.H Rp 70,000.00
Bahan:
Semen portland 9.3000 kg Rp 1,212.50
Semen Nat 1.9400 Kg Rp 1,212.50
Pasir Pasang 0.0180 m3 Rp 310,000.00
Keramik 20x25 cm setara ex. Asia tile 1.0600 m2 Rp 56,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
3 Pasangan lantai keramik Kasar 40x40 cm m2
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
- 31 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Semen portland 10.0000 kg Rp 1,212.50
Semen Nat 0.5000 Kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
Keramik Kasar 40x40 cm 1.0500 m2 Rp 60,450.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
14 Pasangan Dinding Batu Granit 30x60 cm Setara Ex. m2
Sumedang
Tenaga:
Mandor 0.0650 O.H Rp 100,000.00
Kepala Tukang Batu 0.0650 O.H Rp 95,000.00
Tukang Batu 0.6500 O.H Rp 90,000.00
Pekerja 1.3000 O.H Rp 70,000.00
Bahan:
Semen portland 12.4400 kg Rp 1,212.50
Pasir Pasang 0.0250 m3 Rp 310,000.00
Semen Nat 0.6500 kg Rp 1,212.50
Batu Granit 30x60 cm Setara Ex. Sumedang 1.0600 m2 Rp 250,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
15 Pasangan Dinding Batu Granit 40x60 cm Setara Ex. m2
Sumedang
Tenaga:
Mandor 0.0650 O.H Rp 100,000.00
Kepala Tukang Batu 0.0650 O.H Rp 95,000.00
Tukang Batu 0.6500 O.H Rp 90,000.00
Pekerja 1.3000 O.H Rp 70,000.00
Bahan:
Semen portland 12.4400 kg Rp 1,212.50
Pasir Pasang 0.0250 m3 Rp 310,000.00
Semen Nat 0.6500 Kg Rp 1,212.50
Batu Granit 40x60 cm Setara Ex. Sumedang 1.0600 m2 Rp 275,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 32 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
16 Pasangan Lantai Keramik Tipe Granit Motif Terang m2
60/60cm setara ex. Top Gress
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
Semen portland 9.8000 kg Rp 1,212.50
Semen Nat 1.3000 kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
Lantai Keramik Tipe Granit Motif Terang 1.0600 m2 Rp 125,000.00
60/60cm setara ex.Top Gress
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
17 Pasangan Lantai Keramik Tipe Granit Motif Gelap m2
60/60cm setara ex. Top Gress
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
Semen portland 9.8000 kg Rp 1,212.50
Semen Nat 1.3000 kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
Lantai Keramik Tipe Granit Motif Gelap 1.0600 m2 Rp 160,000.00
60/60cm setara ex.Top Gress
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
18 Pasangan Lantai Keramik Tipe Granit Motif Terang m2
60/60cm setara ex. Granito
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
- 33 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
Semen portland 9.8000 kg Rp 1,212.50
Semen Nat 1.3000 kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
Lantai Keramik Tipe Granit Motif Terang 1.0600 m2 Rp 230,500.00
60/60cm setara ex. Granito
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
19 Pasangan Lantai Keramik Tipe Granit Motif Gelap m2
60/60cm setara ex. Granito
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
Semen portland 9.8000 kg Rp 1,212.50
Semen Nat 1.3000 kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
Lantai Keramik Tipe Granit Motif Gelap 1.0600 m2 Rp 307,400.00
60/60cm setara ex. Granito
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
20 Pasangan Lantai Keramik Tipe Granit Motif Terang m2
60/60cm setara ex. Roman
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
Semen portland 9.8000 kg Rp 1,212.50
Semen Nat 1.3000 kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
- 34 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Lantai Keramik Tipe Granit Motif Terang 1.0600 m2 Rp 163,800.00
60/60cm setara ex. Roman
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
21 Pasangan Lantai Keramik Tipe Granit Motif Gelap m2
60/60cm setara ex. Roman
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
Bahan:
Semen portland 9.8000 kg Rp 1,212.50
Semen Nat 1.3000 kg Rp 1,212.50
Pasir Pasang 0.0450 m3 Rp 310,000.00
Lantai Keramik Tipe Granit Motif Gelap 1.0600 m2 Rp 238,800.00
60/60cm setara ex. Roman
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
22 Pasangan Dinding Keramik Tipe Granit Motif Terang m2
60/60cm setara ex. Top Gress
Tenaga:
Mandor 0.0450 O.H Rp 100,000.00
Kepala Tukang Batu 0.0450 O.H Rp 95,000.00
Tukang Batu 0.4500 O.H Rp 90,000.00
Pekerja 0.0900 O.H Rp 70,000.00
Bahan:
Semen portland 9.3000 kg Rp 1,212.50
Semen Nat 1.9400 kg Rp 1,212.50
Pasir Pasang 0.0180 m3 Rp 310,000.00
Dinding Keramik Tipe Granit Motif Terang 1.0600 m2 Rp 125,000.00
60/60cm setara ex.Top Gress
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 35 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
23 Pasangan Dinding Keramik Tipe Granit Motif Gelap m2
60/60cm setara ex. Top Gress
Tenaga:
Mandor 0.0450 O.H Rp 100,000.00
Kepala Tukang Batu 0.0450 O.H Rp 95,000.00
Tukang Batu 0.4500 O.H Rp 90,000.00
Pekerja 0.0900 O.H Rp 70,000.00
Bahan:
Semen portland 9.3000 kg Rp 1,212.50
Semen Nat 1.9400 kg Rp 1,212.50
Pasir Pasang 0.0180 m3 Rp 310,000.00
Dinding Keramik Tipe Granit Motif Gelap 1.0600 m2 Rp 160,000.00
60/60cm setara ex.Top Gress
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
24 Pasangan Dinding Keramik Tipe Granit Motif Terang m2
60/60cm setara ex. Granito
Tenaga:
Mandor 0.0450 O.H Rp 100,000.00
Kepala Tukang Batu 0.0450 O.H Rp 95,000.00
Tukang Batu 0.4500 O.H Rp 90,000.00
Pekerja 0.0900 O.H Rp 70,000.00
Bahan:
Semen portland 9.3000 kg Rp 1,212.50
Semen Nat 1.9400 kg Rp 1,212.50
Pasir Pasang 0.0180 m3 Rp 310,000.00
Dinding Keramik Tipe Granit Motif Terang 1.0600 m2 Rp 230,500.00
60/60cm setara ex. Granito
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
25 Pasangan Dinding Keramik Tipe Granit Motif Gelap m2
60/60cm setara ex. Granito
Tenaga:
Mandor 0.0450 O.H Rp 100,000.00
Kepala Tukang Batu 0.0450 O.H Rp 95,000.00
Tukang Batu 0.4500 O.H Rp 90,000.00
- 36 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Pekerja 0.0900 O.H Rp 70,000.00
Bahan:
Semen portland 9.3000 kg Rp 1,212.50
Semen Nat 1.9400 kg Rp 1,212.50
Pasir Pasang 0.0180 m3 Rp 310,000.00
Dinding Keramik Tipe Granit Motif Gelap 1.0600 m2 Rp 307,400.00
60/60cm setara ex. Granito
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
26 Pasangan Dinding Keramik Tipe Granit Motif Terang m2
60/60cm setara ex. Roman
Tenaga:
Mandor 0.0450 O.H Rp 100,000.00
Kepala Tukang Batu 0.0450 O.H Rp 95,000.00
Tukang Batu 0.4500 O.H Rp 90,000.00
Pekerja 0.0900 O.H Rp 70,000.00
Bahan:
Semen portland 9.3000 kg Rp 1,212.50
Semen Nat 1.9400 kg Rp 1,212.50
Pasir Pasang 0.0180 m3 Rp 310,000.00
Dinding Keramik Tipe Granit Motif Terang 1.0600 m2 Rp 163,800.00
60/60cm setara ex. Roman
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
27 Pasangan Dinding Keramik Tipe Granit Motif Gelap m2
60/60cm setara ex. Roman
Tenaga:
Mandor 0.0450 O.H Rp 100,000.00
Kepala Tukang Batu 0.0450 O.H Rp 95,000.00
Tukang Batu 0.4500 O.H Rp 90,000.00
Pekerja 0.0900 O.H Rp 70,000.00
Bahan:
Semen portland 9.3000 kg Rp 1,212.50
Semen Nat 1.9400 kg Rp 1,212.50
Pasir Pasang 0.0180 m3 Rp 310,000.00
- 37 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Dinding Keramik Tipe Granit Motif Gelap 1.0600 m2 Rp 238,800.00
60/60cm setara ex. Roman
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 38 -

HARGA

Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 4,900.00

Rp 12,610.00
Rp 606.25
Rp 13,950.00
Rp 57,750.00
Rp 128,141.25
Rp 12,814.13
Rp 140,955.38

Rp 4,500.00
Rp 4,275.00
Rp 40,500.00
Rp 6,300.00

Rp 11,276.25
Rp 2,352.25
Rp 5,580.00
Rp 59,360.00
Rp 134,143.50
Rp 13,414.35
Rp 147,557.85

Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 4,900.00
- 39 -

HARGA

Rp 12,125.00
Rp 606.25
Rp 13,950.00
Rp 63,472.50
Rp 133,378.75
Rp 13,337.88
Rp 146,716.63

Rp 6,500.00
Rp 6,175.00
Rp 58,500.00
Rp 91,000.00

Rp 15,083.50
Rp 7,750.00
Rp 788.13
Rp 265,000.00
Rp 450,796.63
Rp 45,079.66
Rp 495,876.29

Rp 6,500.00
Rp 6,175.00
Rp 58,500.00
Rp 91,000.00

Rp 15,083.50
Rp 7,750.00
Rp 788.13
Rp 291,500.00
Rp 477,296.63
Rp 47,729.66
Rp 525,026.29
- 40 -

HARGA

Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 4,900.00

Rp 11,882.50
Rp 1,576.25
Rp 13,950.00
Rp 132,500.00

Rp 203,133.75
Rp 20,313.38
Rp 223,447.13

Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 4,900.00

Rp 11,882.50
Rp 1,576.25
Rp 13,950.00
Rp 169,600.00

Rp 240,233.75
Rp 24,023.38
Rp 264,257.13

Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
- 41 -

HARGA

Rp 4,900.00

Rp 11,882.50
Rp 1,576.25
Rp 13,950.00
Rp 244,330.00

Rp 314,963.75
Rp 31,496.38
Rp 346,460.13

Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 4,900.00

Rp 11,882.50
Rp 1,576.25
Rp 13,950.00
Rp 325,844.00

Rp 396,477.75
Rp 39,647.78
Rp 436,125.53

Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 4,900.00

Rp 11,882.50
Rp 1,576.25
Rp 13,950.00
- 42 -

HARGA

Rp 173,628.00

Rp 244,261.75
Rp 24,426.18
Rp 268,687.93

Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 4,900.00

Rp 11,882.50
Rp 1,576.25
Rp 13,950.00
Rp 253,128.00

Rp 323,761.75
Rp 32,376.18
Rp 356,137.93

Rp 4,500.00
Rp 4,275.00
Rp 40,500.00
Rp 6,300.00

Rp 11,276.25
Rp 2,352.25
Rp 5,580.00
Rp 132,500.00

Rp 207,283.50
Rp 20,728.35
Rp 228,011.85
- 43 -

HARGA

Rp 4,500.00
Rp 4,275.00
Rp 40,500.00
Rp 6,300.00

Rp 11,276.25
Rp 2,352.25
Rp 5,580.00
Rp 169,600.00

Rp 244,383.50
Rp 24,438.35
Rp 268,821.85

Rp 4,500.00
Rp 4,275.00
Rp 40,500.00
Rp 6,300.00

Rp 11,276.25
Rp 2,352.25
Rp 5,580.00
Rp 244,330.00

Rp 319,113.50
Rp 31,911.35
Rp 351,024.85

Rp 4,500.00
Rp 4,275.00
Rp 40,500.00
- 44 -

HARGA

Rp 6,300.00

Rp 11,276.25
Rp 2,352.25
Rp 5,580.00
Rp 325,844.00

Rp 400,627.50
Rp 40,062.75
Rp 440,690.25

Rp 4,500.00
Rp 4,275.00
Rp 40,500.00
Rp 6,300.00

Rp 11,276.25
Rp 2,352.25
Rp 5,580.00
Rp 173,628.00

Rp 248,411.50
Rp 24,841.15
Rp 273,252.65

Rp 4,500.00
Rp 4,275.00
Rp 40,500.00
Rp 6,300.00

Rp 11,276.25
Rp 2,352.25
Rp 5,580.00
- 45 -

HARGA

Rp 253,128.00

Rp 327,911.50
Rp 32,791.15
Rp 360,702.65
- 37 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Pekerjaan Atap
H Pekerjaaan Rangka Atap
1 Pasang rangka atap baja ringan profil C75 Setara Ex. Kencana m2
Tenaga:
Mandor 0.0185 O.H
Kepala Tukang Besi 0.0365 O.H
Tukang Besi 0.3670 O.H
Pekerja 0.3670 O.H
Bahan:
Baja Ringan C75 - 0.75mm Setara Ex. Kencana 7.5000 m1
Baja Ringan Reng TS 40.045 Setara Ex. Kencana 4.2900 m1
Baut 17.5000 buah
Dinabolt 0.5600 buah
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
I Penutup Atap
1 Pasang Atap Genteng Karang Pilang Type Italy ( Kodokan ) m2
Tenaga:
Mandor 0.0080 O.H
Kepala Tukang Kayu 0.0080 O.H
Tukang Kayu 0.0750 O.H
Pekerja 0.1500 O.H
Bahan:
Genteng Karang Pilang Type Italy 25.0000 Biji
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
2 Pasang genteng Wuwung ex.Karangpilang m1
Tenaga:
Mandor 0.0200 O.H
Kepala Tukang Kayu 0.0200 O.H
Tukang Kayu 0.2000 O.H
Pekerja 0.4000 O.H
Bahan:
Semen 8.0000 kg
Pasir Pasang 0.0320 m3
- 38 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Genteng Wuwung Karang Pilang 5.0000 Biji


Jumlah
Overhead + Profit ( 1
Nilai HSPK :
- 39 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

J Plafon
1 Pasang rangka langit - langit (0.5x1)m kayu jati m2
Tenaga:
Mandor 0.0750 O.H
Kepala Tukang Kayu 0.0300 O.H
Tukang Kayu 0.3000 O.H
Pekerja 0.1500 O.H
Bahan:
Jati Kaso 5 x 7 x 400 cm 0.0154 m3
Paku biasa 2"-5" 0.2000 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
2 Pasang rangka langit - langit (0.5x1)m kayu kamper m2
Tenaga:
Mandor 0.0750 O.H
Kepala Tukang Kayu 0.0300 O.H
Tukang Kayu 0.3000 O.H
Pekerja 0.1500 O.H
Bahan:
Kamper Kaso 5 x 7 x 400 cm 0.0154 m3
Paku Biasa 0.2000 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
3 Pasang rangka langit - langit (0.5x1)m kayu kruing m2

Tenaga:
Mandor 0.0750 O.H
Kepala Tukang Kayu 0.0300 O.H
Tukang Kayu 0.3000 O.H
Pekerja 0.1500 O.H
Bahan:
Kruing Kaso 5 x 7 x 400 cm 0.0154 m3
Paku Biasa 0.2000 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
- 40 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

4 Pasang rangka langit - langit (0.6x0.6)m kayu jati m2


Tenaga:
Mandor 0.0100 O.H
Kepala Tukang Kayu 0.0300 O.H
Tukang Kayu 0.3000 O.H
Pekerja 0.2000 O.H
Bahan:
Jati Kaso 5 x 7 x 400 cm 0.0163 m3
Paku Biasa 0.2500 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
5 Pasang rangka langit - langit (0.6x0.6)m kayu kamper m2
Tenaga:
Mandor 0.0100 O.H
Kepala Tukang Kayu 0.0300 O.H
Tukang Kayu 0.3000 O.H
Pekerja 0.2000 O.H
Bahan:
Kamper Kaso 5 x 7 x 400 cm 0.0163 m3
Paku Biasa 0.2500 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
6 Pasang rangka langit - langit (0.6x0.6)m kayu kruing m2
Tenaga:
Mandor 0.0100 O.H
Kepala Tukang Kayu 0.0300 O.H
Tukang Kayu 0.3000 O.H
Pekerja 0.2000 O.H
Bahan:
Kruing Kaso 5 x 7 x 400 cm 0.0163 m3
Paku Biasa 0.2500 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
7 Langit - langit eternit/asbes 1x1 m tebal 3 mm m2
- 41 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Tenaga:
Mandor 0.0040 O.H
Kepala Tukang Kayu 0.0070 O.H
Tukang Kayu 0.0700 O.H
Pekerja 0.0300 O.H
Bahan:
Asbes Datar 100 x 100 x 0.3 1.1000 Lembar
Paku Asbes 0.0100 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
8 Langit - langit Teakwood uk. 120x240, tebal 4 mm m2
Tenaga:
Mandor 0.0050 O.H
Kepala Tukang Kayu 0.0100 O.H
Tukang Kayu 0.1000 O.H
Pekerja 0.1000 O.H
Bahan:
Teakwood 120x 240 0.3750 Lembar
Paku Triplek 0.0300 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
9 List langit - langit kayu kamper m1
Tenaga:
Mandor 0.0030 O.H
Kepala Tukang Kayu 0.0050 O.H
Tukang Kayu 0.0500 O.H
Pekerja 0.0500 O.H
Bahan:
Kamper Kaso 5 x 7 x 400 cm 0.0010 m3
Paku Biasa 0.0100 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
10 Langit-langit gypsum board, tebal 9 mm m2
Tenaga:
- 42 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Mandor 0.0050 O.H


Kepala Tukang Kayu 0.0050 O.H
Tukang Kayu 0.0500 O.H
Pekerja 0.1000 O.H
Bahan:
Gypsum board tb. 9 mm 0.3640 Lembar
Sekrup 11.0000 Buah
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
11 List langit - langit gypsum m1
Tenaga:
Mandor 0.0030 O.H
Kepala Tukang Kayu 0.0050 O.H
Tukang Kayu 0.0500 O.H
Pekerja 0.0500 O.H
Bahan:
List gypsum 1 x 10 cm 1.0500 m1
Tepung Gypsum 0.1500 Kg
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
12 Pekerjaan Langit-langit Calsiboard tebal 3.5mm m2
Tenaga:
Mandor 0.0050 O.H
Kepala Tukang Kayu 0.0050 O.H
Tukang Kayu 0.0500 O.H
Pekerja 0.1000 O.H
Bahan:
Calsiboard Uk. 244x122x3.5mm 0.3640 Lembar
Sekrup 11.0000 Buah
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
1 Pekerjaan Langit-langit Calsiboard tebal 6mm m2
Tenaga:
Mandor 0.0050 O.H
- 43 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Kepala Tukang Kayu 0.0050 O.H


Tukang Kayu 0.0500 O.H
Pekerja 0.1000 O.H
Bahan:
Calsiboard Uk. 244x122x6mm 0.3640 Lembar
Sekrup 11.0000 Buah
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
2 Pemasangan Rangka Plafond Hollow Galvalume 0.6 x 0.6m m2
Tenaga:
Mandor 0.0180 O.H
Kepala Tukang Besi 0.0350 O.H
Tukang Besi 0.3500 O.H
Pekerja 0.3500 O.H
Bahan:
Hollow 2,4 2.6614 m1
Hollow 4,4 2.4063 m1
Assesoris ( Perkuatan, las dll ) 100.0000 %
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
3 Pasang Kalsiplank Lbr 30 cm tebal 8 mm m1
Tenaga:
Mandor 0.0015 O.H
Kepala Tukang Kayu 0.0015 O.H
Tukang Kayu 0.0150 O.H
Pekerja 0.0300 O.H
Bahan:
Kalsiplank Lebar 30 cm tebal 8 mm 0.5250 lbr
Sekrup 2" 6.0000 bh
Jumlah
Overhead + Profit ( 1
Nilai HSPK :
- 44 -

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 1,850.00
Rp 95,000.00 Rp 3,467.50
Rp 90,000.00 Rp 33,030.00
Rp 70,000.00 Rp 25,690.00

Rp 14,000.00 Rp 105,000.00
Rp 5,666.67 Rp 24,310.00
Rp 250.00 Rp 4,375.00
Rp 2,000.00 Rp 1,120.00
mlah Rp 198,842.50
verhead + Profit ( 10 % ) Rp 19,884.25
lai HSPK : Rp 218,726.75

Rp 100,000.00 Rp 800.00
Rp 95,000.00 Rp 760.00
Rp 90,000.00 Rp 6,750.00
Rp 70,000.00 Rp 10,500.00

Rp 4,750.00 Rp 118,750.00
mlah Rp 137,560.00
verhead + Profit ( 10 % ) Rp 13,756.00
lai HSPK : Rp 151,316.00

Rp 100,000.00 Rp 2,000.00
Rp 95,000.00 Rp 1,900.00
Rp 90,000.00 Rp 18,000.00
Rp 70,000.00 Rp 28,000.00

Rp 1,212.50 Rp 9,700.00
Rp 310,000.00 Rp 9,920.00
- 45 -

HARGA
HARGA
SATUAN
Rp 14,500.00 Rp 72,500.00
mlah Rp 142,020.00
verhead + Profit ( 10 % ) Rp 14,202.00
lai HSPK : Rp 156,222.00
- 46 -

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 7,500.00
Rp 95,000.00 Rp 2,850.00
Rp 90,000.00 Rp 27,000.00
Rp 70,000.00 Rp 10,500.00

Rp 8,570,000.00 Rp 131,978.00
Rp 15,850.00 Rp 3,170.00
mlah Rp 182,998.00
verhead + Profit ( 10 % ) Rp 18,299.80
lai HSPK : Rp 201,297.80

Rp 100,000.00 Rp 7,500.00
Rp 95,000.00 Rp 2,850.00
Rp 90,000.00 Rp 27,000.00
Rp 70,000.00 Rp 10,500.00

Rp 7,855,000.00 Rp 120,967.00
Rp 15,850.00 Rp 3,170.00
mlah Rp 171,987.00
verhead + Profit ( 10 % ) Rp 17,198.70
lai HSPK : Rp 189,185.70

Rp 100,000.00 Rp 7,500.00
Rp 95,000.00 Rp 2,850.00
Rp 90,000.00 Rp 27,000.00
Rp 70,000.00 Rp 10,500.00

Rp 6,849,900.00 Rp 105,488.46
Rp 15,850.00 Rp 3,170.00
mlah Rp 156,508.46
verhead + Profit ( 10 % ) Rp 15,650.85
lai HSPK : Rp 172,159.31
- 47 -

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 1,000.00
Rp 95,000.00 Rp 2,850.00
Rp 90,000.00 Rp 27,000.00
Rp 70,000.00 Rp 14,000.00

Rp 8,570,000.00 Rp 139,691.00
Rp 15,850.00 Rp 3,962.50
mlah Rp 188,503.50
verhead + Profit ( 10 % ) Rp 18,850.35
lai HSPK : Rp 207,353.85

Rp 100,000.00 Rp 1,000.00
Rp 95,000.00 Rp 2,850.00
Rp 90,000.00 Rp 27,000.00
Rp 70,000.00 Rp 14,000.00

Rp 7,855,000.00 Rp 128,036.50
Rp 15,850.00 Rp 3,962.50
mlah Rp 176,849.00
verhead + Profit ( 10 % ) Rp 17,684.90
lai HSPK : Rp 194,533.90

Rp 100,000.00 Rp 1,000.00
Rp 95,000.00 Rp 2,850.00
Rp 90,000.00 Rp 27,000.00
Rp 70,000.00 Rp 14,000.00

Rp 6,849,900.00 Rp 111,653.37
Rp 15,850.00 Rp 3,962.50
mlah Rp 160,465.87
verhead + Profit ( 10 % ) Rp 16,046.59
lai HSPK : Rp 176,512.46
- 48 -

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 400.00
Rp 95,000.00 Rp 665.00
Rp 90,000.00 Rp 6,300.00
Rp 70,000.00 Rp 2,100.00

Rp 17,500.00 Rp 19,250.00
Rp 22,150.00 Rp 221.50
mlah Rp 28,936.50
verhead + Profit ( 10 % ) Rp 2,893.65
lai HSPK : Rp 31,830.15

Rp 100,000.00 Rp 500.00
Rp 95,000.00 Rp 950.00
Rp 90,000.00 Rp 9,000.00
Rp 70,000.00 Rp 7,000.00

Rp 132,800.00 Rp 49,800.00
Rp 19,000.00 Rp 570.00
mlah Rp 67,820.00
verhead + Profit ( 10 % ) Rp 6,782.00
lai HSPK : Rp 74,602.00

Rp 100,000.00 Rp 300.00
Rp 95,000.00 Rp 475.00
Rp 90,000.00 Rp 4,500.00
Rp 70,000.00 Rp 3,500.00

Rp 7,855,000.00 Rp 7,855.00
Rp 15,850.00 Rp 158.50
mlah Rp 16,788.50
verhead + Profit ( 10 % ) Rp 1,678.85
lai HSPK : Rp 18,467.35
- 49 -

HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 500.00
Rp 95,000.00 Rp 475.00
Rp 90,000.00 Rp 4,500.00
Rp 70,000.00 Rp 7,000.00

Rp 70,000.00 Rp 25,480.00
Rp 350.00 Rp 3,850.00
mlah Rp 41,805.00
verhead + Profit ( 10 % ) Rp 4,180.50
lai HSPK : Rp 45,985.50

Rp 100,000.00 Rp 300.00
Rp 95,000.00 Rp 475.00
Rp 90,000.00 Rp 4,500.00
Rp 70,000.00 Rp 3,500.00

Rp 18,150.00 Rp 19,057.50
Rp 4,250.00 Rp 637.50
mlah Rp 28,470.00
verhead + Profit ( 10 % ) Rp 2,847.00
lai HSPK : Rp 31,317.00

Rp 100,000.00 Rp 500.00
Rp 95,000.00 Rp 475.00
Rp 90,000.00 Rp 4,500.00
Rp 70,000.00 Rp 7,000.00

Rp 54,400.00 Rp 19,801.60
Rp 350.00 Rp 3,850.00
mlah Rp 36,126.60
verhead + Profit ( 10 % ) Rp 3,612.66
lai HSPK : Rp 39,739.26

Rp 100,000.00 Rp 500.00
- 50 -

HARGA
HARGA
SATUAN
Rp 95,000.00 Rp 475.00
Rp 90,000.00 Rp 4,500.00
Rp 70,000.00 Rp 7,000.00

Rp 95,000.00 Rp 34,580.00
Rp 350.00 Rp 3,850.00
mlah Rp 50,905.00
verhead + Profit ( 10 % ) Rp 5,090.50
lai HSPK : Rp 55,995.50

Rp 100,000.00 Rp 1,800.00
Rp 95,000.00 Rp 3,325.00
Rp 90,000.00 Rp 31,500.00
Rp 70,000.00 Rp 24,500.00

Rp 4,216.67 Rp 11,222.38
Rp 5,625.00 Rp 13,535.35
Rp 24,757.74 Rp 24,757.74
mlah Rp 110,640.47
verhead + Profit ( 10 % ) Rp 11,064.05
lai HSPK : Rp 121,704.52

Rp 100,000.00 Rp 150.00
Rp 95,000.00 Rp 142.50
Rp 90,000.00 Rp 1,350.00
Rp 70,000.00 Rp 2,100.00

Rp 72,500.00 Rp 38,062.50
Rp 350.00 Rp 2,100.00
mlah Rp 43,905.00
verhead + Profit ( 10 % ) Rp 4,390.50
lai HSPK : Rp 48,295.50
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

1 3 4 5
BAHAN BANGUNAN DAN KONSTRUKSI
Aspal
1 Aspal Aspal Bitumen Kg
2 Aspal Aspal Curah (AC 60/70) Kg
3 Aspal Buton Granular Kg
4 Aspal Chemecrete Kg
5 Aspal Pengikat (Tack Coat) ltr
6 Aspal resap pengikat ( prime coat ) ltr
7 Filler ltr
8 Aspal Curah Kemasan Drum Kg
9 Asbuton Halus Ton
Semen
1 Semen Gresik 40 Kg zak 46,000
2 Semen Gresik 50 Kg zak 55,000
3 Semen Holcim, 40 Kg zak 41,500
4 Semen Holcim, 50 Kg zak 54,500
5 Semen Semen warna/nat Kg 14,200
Beton Ready Mixed
1 Beton Ready Mixed K-125 m3 760,000
2 Beton Ready Mixed K-150 m3 780,000
3 Beton Ready Mixed K-175 m3 800,000
4 Beton Ready Mixed K-225 m3 820,000
5 Beton Ready Mixed K-250 m3 850,000
6 Beton Ready Mixed K-300 m3 900,000
7 Beton Ready Mixed K-350 m3 950,000
8 Beton Ready Mixed K-400 m3 1,000,000
9 Beton Ready Mixed K-500 m3 1,060,000
Kaca
1 Kaca Fiber glas 92 cm m2 36,800
2 Kaca Krepyak Nako daun 17,850
3 Kaca Polos Bening 8 mm m2 161,000
4 Kaca Polos Bening 10 mm m2 230,600
5 Kaca Polos Bening 12 mm m2 312,850
6 Kaca Polos Bening tebal 3mm m2 92,500
7 Kaca Polos Bening tebal 5mm m2 123,300
8 Kaca Rayben tebal 3mm m2 97,500
9 Kaca Rayben tebal 5mm m2 123,750
10 Kaca Kaca Es Tebal 5mm m2 106,850
11 Kaca Vertical Blind m2 151,050
12 Kaca Acrylic, bening uk. 5mm ( 122 x 244 cm ) buah 1,189,900
13 Kaca Acrylic, bening uk. 10mm ( 122 x 244 cm ) buah 2,172,900
14 Kaca Kaca Tempered Tebal 8 mm m2 655,000
15 Kaca Kaca Tempered Tebal 10 mm m2 750,000
16 Kaca Kaca Tempered Tebal 12 mm m2 825,000
Pasir
1 Pasir Beton m3 300,000
2 Pasir Pasang m3 300,000
3 Pasir Sirtu m3 175,000
4 Pasir Tanah Urug /Padas/Tanah Liat m3 70,000
5 Pasir Urug m3 134,250
6 Tanah Tanam m3 90,000

51
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

Batu
1 Batu Ampyang Multi warna m2 81,400
2 Batu Bata Merah Biji 700
3 Batu Batako Semen (40x 20x 10 cm) Buah 6,000
4 Batu Candi Alur m2 143,750
5 Batu Gilang Ex Cirebon Acak m2 103,500
6 Batu Gilang Ex Cirebon Uk. 10 x 20 m2 115,800
7 Batu Gilang Ex Jember Acak m2 98,300
8 Batu Gilang Ex Jember 20x40 m2 96,100
9 Batu Grass Block Buah 21,800
10 Batu Looster, abu-abu Biji 9,900
11 Batu Looster, Merah Biji 8,000
12 Batu Palimanan Hijau m2 136,600
13 Batu Palimanan Kuning m2 141,700
14 Batu Pecah Mesin 0,5/1 cm m3 250,000
15 Batu Pecah Mesin 1/2 cm m3 262,900
16 Batu Pecah Mesin 2/3 cm m3 252,950
17 Batu Pecah Tangan 15/20 m3 139,850
18 Batu Pecah Tangan 3/5 cm m3 236,200
19 Batu Pecah Tangan 5/7 cm m3 175,000
Cat
1 Cat Avian Kg 25,200
2 Cat Bron Kg 39,800
3 Cat Cat Mobil Liter 121,000
4 Cat Cerlak galon 208,600
5 Cat Clear Doof Kg 50,600
6 Cat Coumpond isi 1 Kg Kaleng 35,100
7 Cat Dempul Kayu, Pedang Kg 25,400
8 Cat Dempul Kayu, Bakar Buah 3,300
9 Cat Dempul Mobil Kg 41,700
10 Cat Dempul Mobil Classy Kg 41,700
11 Cat Duco Gram 60,000
12 Cat Genteng, Sanlek Galon 185,750
13 Cat Kayu / Emco Kg 61,550
14 Cat Besi/emco Kg 60,650
15 Cat Meni Besi, Pedang Kg 28,200
16 Cat Minyak Cat, Avian Liter 28,000
17 Cat Minyak Cat, Biasa Liter 11,700
18 Cat Pewarna Cat Tembak Kg 58,950
19 Cat Plamur Kayu, Cap Pedang Kg 27,000
20 Cat Plamur Tembok Kg 36,000
21 Cat Politur jadi Liter 40,500
22 Residu Liter 4,600
23 Cat Shanding Kg 53,150
24 Cat Teer Kg 14,400
25 Cat Catylac 5Kg 110,750
26 Cat Tembok Decholite (5 Kg) Galon 99,600
27 Cat Tembok Interior Dulux Khusus Liter 55,900
28 Cat Tembok Interior Dulux standar Liter 57,000
29 Cat Thinner A Special Liter 27,300
30 Cat Thinner B Liter 12,000
31 Cat Wood Filler Kg 39,400
32 Cat Tembok Eksterior Dulux ( Standar ) Liter 89,000
33 Cat Tembok Eksterior Dulux ( Khusus ) Liter 96,100

52
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

34 Cat Tembok Dasar Alkali, Interior Dulux Liter 41,000


35 Cat Jotun Eksterior Jotashield Kg 112,500
36 Cat Genteng Sanlek Galon 185,750
37 Woodstain impra kg 77,500
38 Melamic impra kg 55,250

53
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

Waterproofing
1 Waterproofing No Drop, 1 Kg Kaleng 49,500
2 Waterproofing No Drop, 4 Kg Kaleng 190,000
3 Waterproofing No Drop, 20 Kg Kaleng 861,450
Seng
1 Seng Gelombang BJLS 20 uk. (80 x 300 cm) Lembar 82,300
2 Seng Gelombang BJLS 28 uk. (80 x 180 cm) Lembar 53,100
3 Seng Gelombang BJLS 30 uk. (80 x 210 cm) Lembar 54,000
4 Seng Gelombang BJLS 30 uk. (80x 300cm) Lembar 77,000
5 Seng Gelombang BJLS 30 uk. (80x 180cm) Lembar 46,250
6 Seng Gelombang BJLS 40 uk. (80 cm x300 cm) Lembar 139,700
7 Seng Gelombang BJLS 40 uk. (80 cm x210 cm) Lembar 103,500
8 Seng Gelombang BJLS 40 uk (80 x 240 cm) Lembar 113,800
9 Seng Gelombang Nok Stel Gelombang Seng Stel 26,500
10 Seng Gelombang Plat BJLS 30/30 cm m1 17,300
11 Seng Gelombang Plat BJLS 30/40 cm m1 20,900
12 Seng Gelombang Plat BJLS 30/80 cm m1 38,000
13 Seng Gelombang Plat uk (0,03x90x180)cm Lembar 65,700
14 Seng Gelombang Sambungan talang Buah 8,700
15 Seng Gelombang Talang 60cm x 30 BJLS m1 18,000
16 Seng Gelombang Talang 60cm x 40 BJLS m1 41,800
17 Seng Gelombang Talang 90cm x 30 BJLS m1 29,000
18 Seng Gelombang Talang 90cm x 40 BJLS m1 46,500
Atap Spandek
1 Atap Spandek tebal 0,3 lebar 75 cm m1 33,000
2 Atap Spandek tebal 0,35 lebar 75 cm m1 44,000
3 Atap Spandek tebal 0,4 lebar 75 cm m1 49,000
4 Atap Spandek tebal 0,45 lebar 75 cm m1 72,900
5 Atap Spandek tebal 0,5 lebar 75 cm m1 77,000
Baja
1 Baja Baja WF Kg 13,000
2 Baja Plat esser 0.12x120x 240 cm m2 110,000
3 Baja Plat esser 0.3x120 x 240 cm m2 242,250
4 Baja Plat Eyser 0,09 m2 145,450
5 Baja Plat Eyser 0,2 m2 201,400
6 Baja Plat Eyser 0,3 m2 272,450
7 Baja Plat Siku Kg 12,500
8 Baja Plat Strip Kg 12,500
9 Baja Plate Bronze Kg 29,100
10 Baja Rangka Galvalume & Accessories m2 212,950
11 Baja Ringan Zincalum, C75 - 0.75mm btg 79,000
12 Baja Ringan Zincalum, Reng TS 40.048 btg 33,000
13 Baja Ringan UK75 - 0.75mm btg 151,500
14 Baja Kanal C kg 12,500
Besi
1 Besi Beton, polos Kg 9,500
2 Besi Beton, Ulir Kg 10,600
3 Besi Angkur 30 x 30 x 3 mm Meter 18,100
4 Hollow 4 x 4, panjang 6 m ( Galvalume ) Batang 27,000
5 Hollow 2 x 4, panjang 6 m ( Galvalume ) Batang 20,250
6 Pipa Besi Hollow 3 x 3, panjang 6 m Batang 86,000
7 Pipa Besi Hollow 2 x 4, panjang 6 m Batang 86,000
8 Pipa Besi Hollow 4 x 4, panjang 6 m Batang 109,650
9 Pipa Besi Hollow 5 x 5, panjang 6 m Batang 147,000

54
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

10 Pipa Besi Hollow 6 x 6, panjang 6 m Batang 175,000


11 Pipa Besi Hollow 7 x 7, panjang 6 m Batang 250,000

55
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

Wire Mesh U50


1 Besi M6, Uk. 2,1 x 5,4 m Lembar 400,000
Genteng
1 Genteng Beton Biji 6,000
2 Genteng Bubungan Beton Biji 8,900
3 Genteng Bubungan ex Trenggalek Biji 6,750
4 Genteng Bubungan ex Wisma Biji 14,750
5 Genteng Wuwung Natural/Mahogani Biji 24,000
6 Genteng Galvalume Biji 8,800
7 Genteng Keramik Glassur Kanmuri Biji 11,000
8 Genteng Karangpilang type Italy uk. 19.5 x 23.5 Biji 4,600
9 Genteng Karangpilang type Flat Gemini uk. 23.79 x Biji 5,500
10 Genteng 31.78
Karangpilang type Flat Grande uk. 26.89 x 41 Biji 8,600
11 Genteng Karangpilang type Fiber uk. 24.2 x 31.7 Biji 5,500
12 Genteng Keramik Biji 10,000
13 Genteng Kodok ex Trenggalek Biji 2,100
14 Genteng Lokal Biji 1,350
15 Genteng Nok Genteng Beton Biji 9,400
16 Genteng Penutup Zincalum m2 52,800
17 Genteng Beton Setara Ex. Cisangkan Biji 13,800
18 Genteng Wuwung Beton Setara Ex. Cisangkan Biji 35,300
Penutup AtapZincalum
1 Penutup AtapZincalu Tebal = 0,3 mm m2 79,900
2 Penutup AtapZincalu Tebal = 0,35 mm m2 95,100
3 Penutup AtapZincalu Tebal = 0,4 mm m2 105,900
Buis Beton
1 Buis Beton Bulat 20/100 cm Biji 38,200
2 Buis Beton Bulat 30/100 cm Biji 56,300
3 Buis Beton Bulat 40/100 cm Biji 67,600
4 Buis Beton Bulat 50/100 cm biji 90,000
5 Buis Beton Bulat 50/50 cm Biji 65,000
6 Buis Beton Bulat 60/100 cm Biji 95,000
7 Buis Beton Bulat 60/50 cm Biji 71,400
8 Buis Beton Bulat 80/100 cm Biji 100,000
9 Buis Beton Bulat 80/50 cm Biji 116,200
10 Buis Beton Bulat 100/50 cm Biji 140,000
11 Buis Beton U 15 cm, panjang 100 cm Biji 22,000
12 Buis Beton U 20 cm, panjang 100 cm Biji 23,900
13 Buis Beton U 30 cm, panjang 100 cm Biji 33,900
14 Buis Beton U 40 cm, panjang 100 cm Biji 36,200
15 Buis Beton U 50 cm, panjang 100 cm Biji 40,000
Aluminium
1 Aluminum Plat aluminium tb 2 mm m2 584,700
2 Aluminum Alloy 10 x 10 x 2 cm buah 73,900
3 Aluminum Braket m1 25,900
4 Aluminum Karet Kusen Aluminium m1 4,000
5 Aluminum Profil 3" Coklat ( 3 x 7.5 ) m1 95,000
6 Aluminum Profil 3" Putih ( 3 x 7.5 ) / coating m1 103,000
7 Aluminum Profil 4" Coklat ( 4 x 10 ) m1 107,000
8 Aluminum Profil 4" Putih ( 4 x 10 ) / coating m1 120,000
9 Aluminum Slimar 3/8" Jendela m1 63,700
10 Allumunium Foil Bubble, Double Side Medium t = 4mm ( 1.2 x lembar 650,000
11 25
WPC m) m1 110,000
12 Allumunium Foil Tape 48 mm x 45 m roll 57,500

56
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

Amplas
1 Amplas Halus Feting 0 s/d 3 Buah 5,000
2 Amplas Kasar Fujistar 0 s/d 1000 Buah 4,900
Asbes
1 Asbes Gel Besar Tbl 6 mm; 1.80x1.05 m Lembar 51,000
2 Asbes Gel Besar Tbl 4 mm ; 3 x 1.05 m Lembar 65,000
3 Asbes Gel Besar Tbl 5 mm ; 3 x 1.10 m Lembar 67,000
4 Asbes Gel Besar Tbl 6 mm; 2.10x1.05 m Lembar 37,000
5 Asbes Gel Besar Tbl 6 mm; 2.40x1.05 m Lembar 42,000
6 Asbes Gel Kecil Tbl 4 mm; 1.80x1.05 m Lembar 50,000
7 Asbes Gel Kecil Tbl 4 mm; 2.10x1.05 m Lembar 58,000
8 Asbes Gel Kecil Tbl 4 mm; 2.40x1.05 m Lembar 68,000
9 Asbes Gel Kecil Tbl 4 mm; 2.70x1.05 m Lembar 80,500
10 Asbes Gel Kecil Tbl 4 mm; 3.00x1.05 m Lembar 74,100
11 Asbes Gel Kecil Tbl 5 mm; 3.05x1.05 m Lembar 85,100
12 Asbes Datar uk. 100 x 100 x 0.3Cm Lembar 20,000
13 Asbes Gel. Besar Tbl 5 mm ; 2.5 x 1.10 Lembar 106,200
14 Asbes Gel. Kecil Tbl 4 mm ; 1.5 x 1.05 Lembar 53,100
15 Asbes Gel. Kecil Tbl 5 mm ; 2.00 x 0.92 Lembar 73,900
16 Asbes Sirap Uk. 20x3x400 cm Lembar 25,650
17 Asbes Nok Nok Asbes Gel. Besar Lembar 50,000
18 Asbes Nok Nok Asbes Gel. Kecil Lembar 33,000
Bahan Las
1 Bahan Las Elektroda Baja Kg 67150
2 Bahan Las Kawat Las 2.6 mm Kg 33600
Closet
1 Closet Ina, Duduk Komplit [2 Kran] Set 1,459,900
2 Closet Jongkok porselin Buah 152,800
3 Closet Jongkok teraso Buah 98,800
4 Closet Toto, Lengkap Set 2,200,000
Hand Shower
1 Hand Shower Shower (Stainless) Buah 108,550
Wastafel
1 Wastafel duty blue/white Buah 191,700
2 Wastafel Ina, Bahan Keramik Buah 352,400
3 Wastafel Toto Buah 546,200
4 Wastafel Urinoir Merk. Toto Buah 931,200
Bak Cuci Piring
1 Bak Cuci Piring Bak Cuci Piring 100 Cm Afur Besar Buah 700,900
2 Bak Cuci Piring Bak Cuci Piring 100 Cm Afur Kecil Buah 357,300
3 Bak Cuci Piring Bak Cuci Piring 80 Cm Afur Besar Buah 595,600
4 Bak Cuci Piring Kenny, Stainless 90x50x14 cm+Afur Buah 201,650
Tempat Sabun
1 Tempat Sabun Duty oval maron/sorento/tosca Buah 410,700
2 Tempat Sabun Duty kotak maron/sorento/tosca Buah 35,000
3 Tempat Sabun Duty oval blue/green Buah 347,100
4 Tempat Sabun Duty oval maron/ sorento/ tosca Buah 410,700
Karpet
1 Wall Paper Buaya, lebar 55 cm m2 11,000
Penutup Lantai
1 Granit Batu Granit, 30 x 60 m2 466,300
2 Granit Batu Granit, 40 x 60 m2 524,600

57
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

3 Keramik Granito 40x40 cm m2 282,800


4 Keramik Kuku Macan 2,5 cm x 10 cm Biji 900
5 Keramik Motif 20 x 20 ( asia ) m2 50,000
6 Keramik Motif 20 x 25 ( asia ) m2 55,000
7 Keramik Motif 30 x 30 ( asia ) m2 55,000
8 Keramik Motif 40 x 40 ( asia ) m2 55,000
9 Keramik Plint keramik 10x20 cm m1 23,000
10 Keramik Polos 20 x 25 (mulia) m2 47,500
11 Keramik Polos 30 x 30 (asia) m2 42,000
12 Keramik Polos 40 x 40 (asia) m2 46,000
13 Keramik Variasi, Motif Lukisan Biji 23,000
14 Keramik List motif / variasi m1 56,200
16 Keramik Kasar 40 x 40 m2 60,450
17 Keramik Granito Polos 60/60 m2 230,500
18 Keramik Granito Gelap 60/60 m2 307,400
19 Keramik Roman Granit terang dof 60/60 m2 163,800
20 Keramik Roman Granit motif terang dof 60/60 m2 208,300
21 Keramik Roman Granit motif gelap dof 60/60 m2 238,800
22 Keramik Happy House Polos 60/60 m2 93,000
23 Keramik Happy House Motif Terang 60/60 m2 103,000
24 Keramik Top Gress Polos 60/60 m2 95,000
25 Keramik Top Gress Garis/Kayu 60/60 m2 105,000
26 Keramik Top Gress Gelap 60/60 m2 160,000
27 Keramik Top Gress Batu Tumpah 60/60 m2 125,000
28 Keramik Valentino Middle Black 60/60 m2 130,000
29 Keramik Valentino Garis 60/60 m2 102,000
Kuas
1 Kuas Cat Sterna, 2 " Buah 8,000
2 Kuas Cat Sterna, 3" Buah 12,350
3 Kuas Cat Sterna, 4" Buah 18,450
4 Kuas Roll Imundex Kecil Buah 18,600
5 Kuas Roll Imundex Besar Buah 22,750
Lem
1 Lem Kayu, Rajawali Kg 13,300
2 Lem PVC Kg 8,150
3 sealent botol 30,600
Marmer
1 Marmer Ex. Lampung 30 x 60 cm (A) m2 563,000
2 Marmer Ex. Lampung 30 x 60 cm (B) m2 315,600
3 Marmer Ex. Lampung 40 x 60 cm (A) m2 457,400
4 Marmer Ex. Tulungagung 30 x 60 cm m2 237,700
5 Marmer Ex. Tulungagung 40 x 60 cm m2 245,300
6 Marmer Plint m1 218,100
Paku
1 Paku Paku Asbes Kg 18,000
2 Paku Paku Beton Hitam Kg 24,450
3 Paku Paku Biasa/ keling/ Usuk/ Triplek/ Eternit/ Reng Kg 15,850

4 Paku Paku Sekrup Besar Buah 1,100


5 Paku Sekrup 1" buah 200
Pintu & Pagar
1 Pagar Besi Motif Variasi m2 589,400
2 Pintu Besi Lipat m2 330,700

58
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

3 Pintu Rolling Door onesheet solid ( terpasang ) m2 539,850


4 Pintu Rolling Door Seng m2 272,100
5 Pintu Kamar Mandi galvalum wto Set 231,600
6 Pintu Kamar Mandi Aluminium Uk.70 x 200cm Set 1,251,900

7 Pintu Kamar Mandi PVC polos uk. 197 x 70 cm Set 188,300

Sekrup
1 Sekrup 2" Buah 300

59
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

PolyCarbonate
2 PolyCarbonate L. 2,1 m P. 11,8 m t.5 mm m2 109,350
Gypsum
1 Gypsum board Tebal 12 mm Lembar 93,300
2 Gypsum board Tebal 9 mm Lembar 61,600
3 List Gypsum profil m 17,200
Kalsiboard
1 Kalsiboard Uk. 244 x 122 x 3,5 mm Lembar 51,600
2 Kalsiboard Uk. 244 x 122 x 4,5 mm Lembar 60,000
3 Kalsiboard Uk. 244 x 122 x 6 mm Lembar 118,300
4 Kalsiplank lbr = 20 cm Lembar 46,400
5 Kalsiplank lbr = 30 cm Lembar 68,950
6 Lisplank GRC m2 315,000
Got Talang
1 Got Talang R.10 (1/2 lingkaran) Buah 12,400
2 Got Talang R.10 (segmen) Buah 13,500
3 Got Talang R.15 (1/2 lingkaran) Buah 16,000
4 Got Talang R.15 (segmen) Buah 16,800
5 Got Talang R.25 (1/2 lingkaran) Buah 24,300
6 Got Talang R.25 (segmen) Buah 27,100
Paving Stone
1 Kanstin Uk. 40 x18 x 10 cm bh 10,100
2 Kanstin Uk. 50 x 35 x 15 cm bh 28,200
3 Kanstin Uk. 10 x 20 x 40 cm ex. Focon m1 64,090
4 Kanstin Uk. 15/20 x 30 x 50 cm ex. Focon m1 105,272
5 Paving block Abu. Uk. 11,5 x 22,5 x 6 cm ex. Conblock m2 103,100
6 Paving block Abu. Uk. 11,5 x 22,5 x 8 cm ex. Conblock m2 119,700
7 Paving block Hijau. Uk. 11,5 x 22,5 x 6 cm ex. Conblock m2 131,300
8 Paving block Hijau. Uk. 11,5 x 22,5 x 8 cm ex. Conblock m2 150,700
9 Grass Block Tebal 6 Buah 18,600
10 Grass Block uk. 21.5 x 42 cm, Tebal 10 m2 103,500
11 Paving Stone Tebal 6cm Kw 1,abu-abu m2 60,700
12 Paving Stone Tebal 8cm Kw 1, abu-abu m2 75,900
13 Paving block uk. 21.21.6 Abu-abu / corso K 300 ex. Focon m2 88,000
14 Paving block uk. 21.21.8 Abu-abu / corso K 300 ex. Focon m2 105,000
15 Paving block uk. 21.21.6 Merah / corso K 300 ex. Focon m2 108,000
16 Paving block uk. 21.21.8 Merah / corso K 300 ex. Focon m2 130,000
17 Grass Block tebal 10 cm ex. Focon m2 130,000
18 Paving block uk. 10.5.21.6 Abu-abu K 300 ex. Focon m2 76,500
19 Paving block uk. 10.5.21.6 Merah K 300 ex. Focon m2 96,500
20 Paving block uk. 10.5.21.8 Abu-abu K 300 ex. Focon m2 101,500
21 Paving block uk. 10.5.21.8 Merah K 300 ex. Focon m2 126,500
Kawat
1 Kawat Kawat Beton Kg 19,300
Kayu dan Bambu
1 Bambu Pring Dia 10-12 cm x 4 m Batang 20,000
2 Kayu Bekesting (meranti) m3 3,564,050
3 Kayu Glugu Balok 8 x 10 x 300 cm Batang 3,000,000
4 Kayu Jati Balok 6 x 12 x 400cm m3 ###
5 Kayu Jati Balok 8 x 12 x 400cm m3 ###
6 Kayu Jati Kaso 3 x 5 x 400cm m3 7,873,350
7 Kayu Jati Kaso 4 x 6 x 400cm m3 ###
8 Kayu Jati Kaso 5 x 7 x 400cm m3 ###

60
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

9 Kayu Jati Papan 2 x 20 x 400cm m3 ###


10 Kayu Jati Reng 2 x 3 x 400cm m3 ###
11 Kayu Jati Reng 3 x 5 x 400cm m3 ###
12 Kayu Kamper Balok 6 x 12 x 400cm m3 ###
13 Kayu Kamper Kaso 5 x 7 x 400cm m3 8,622,700
14 Kayu Kamper Papan 2 x 20 x 400cm m3 9,772,350
15 Kayu Kamper Reng 2 x 3 x 400cm m3 7,248,050
16 Kayu Kruing Balok 6 x 12 x 400cm m3 6,000,000
17 Kayu Kruing Kaso 5 x 7 x 400cm m3 5,500,000
18 Kayu Kruing Papan 2 x 20 x 400cm m3 6,500,000
19 Kayu Kruing Reng 2 x 3 x 400cm m3 5,500,000
20 Kayu Meranti Balok 6 x 12 x 400Cm m3 5,386,100
21 Kayu Meranti Kaso 5 x 7 x 400Cm m3 5,386,100
22 Kayu Meranti Papan 2 x 20 x 400Cm m3 5,565,700
23 Kayu Meranti Reng 2 x 3 x 400Cm m3 5,075,300
24 Kayu Multipleks (0,9 x 122 x 244)cm Lembar 95,000
25 Kayu Multipleks (1,2 x 122 x 244) cm Lembar 150,000
26 Kayu Plywood 122x244x4 mm Lembar 95,400
27 Kayu Plywood 122x244x6 mm Lembar 129,000
28 Kayu Plywood 122x244x8 mm Lembar 124,600
29 Kayu Teakwood 90.210.4 mm Lembar 75,500
30 Kayu Teakwood (0,4 x 110 x 210) cm Lembar 114,700
31 Kayu Teakwood (0,4 x 122 x 244) cm Lembar 126,100
32 Kayu Tripleks (0,3 x 122 x 244)cm Lembar 50,000
33 Kayu Tripleks (0,4 x 122 x 244)cm Lembar 80,000
34 Kayu Tripleks (0,6 x 122 x 244)cm Lembar 83,000
35 Kayu Tripleks (0,3 x 90 x 210) cm + Aluminium Lembar 100,700
Bahan-Bahan Lainnya
1 Tiang Pancang Uk. 30 cm x 30 cm x 6 m Beton K 500 Batang 1,336,500
2 Persegi
HPL Type Metalic, Hairline, Uk. 1242mm x 2484 mm Buah 356,800
3 HPL x 0,8 Metalic,
Type mm Alumunium, Uk. 1242mm x 2484 Buah 538,000
4 HPL mm xMetalic,
Type 0,8 mmBronze, Uk. 1242mm x 2484 mm Buah 352,400
5 HPL x 0,8 mm
Type Monochromatic, Light Grey,Uk. 1242mm x Buah 197,600
6 Lem HPL 2484
9,5 Kgmm x 0,8 mm Botol 323,900
7 Pintu HPL Kaka Uk. 82x210cm Buah 1,403,000
8 Pintu HPL WPC Duma Uk. 82x210cm Buah 1,604,000
9 Alucopan Goldstar m2 210,500
10 Alucopan Alustar m2 236,800
11 Alucopan New Alucopan m2 289,500
12 Alucopan Luminate m2 223,700
13 Alucopan Alucobond m2 644,800
14 Roof Tank Kap. 2m3 Buah 1,862,500
15 Tandon Air Fiberglas 520 Liter, Penguin Buah 1,070,900
SUKU CADANG
SUKU CADANG ALAT ANGKUTAN DARAT
Bahan Bakar Minyak
1 Bensin / Premium ltr 7,350
2 Pertamax ltr 9,250
3 Bio Solar ltr 5,750
Minyak Pelumas
1 Minyak Pelumas ltr 40,000
Suku Cadang Lainnya
1 Seal karet M' 10,200

61
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

Alat-Alat Perlengkapan Rumah


Engsel
1 Engsel Akses Set 15,750
2 Engsel Dior 3 kuning Set 15,800
3 Engsel Dior 4 kuning Set 21,600
4 Engsel Dior 5 kuning Set 25,000
5 Engsel Engsel Dorong / Railing Pintu Merk Handerson Pasang 275,000

6 Engsel Gomeo 4 dim Kuningan Set 24,500


7 Engsel Hidrolis Pintu aluminium Pasang 744,500
8 Engsel Hings, 5 dim Kuningan Jendela Set 24,700
9 Engsel Jendela Kuningan Pasang 28,000
10 Engsel kuningan 3" (Pintu Kayu) Kotak 21,500
11 Engsel muller kuning 5" (Pintu Alm.) Kotak 35,000
12 Engsel salon HK 20 Kotak 17,000
13 Engsel salon HK 25 Kotak 18,700
14 Engsel Salon HK 30 Pasang 15,000
15 Engsel Solid EK 17 Pasang 33,300
Gembok
1 Gembok Hitam Cooper 75 mm Buah 106,600
Grendel
1 Grendel Engsel Kuningan Buah 20,000
2 Grendel Grendel Biasa (Besar) Buah 10,000
3 Grendel Grendel Biasa (Kecil) Buah 6,000
4 Grendel Grendel Panjang Buah 18,500
5 Grendel Grendel Tanam Buah 60,000
6 Grendel Kuningan / crom (kuning) Buah 20,000
Kran
1 Kran air goldeno /yuri 1/2" Buah 17,500
2 Kran Plastik 1/2" Buah 13,500
3 Kran Putar Untuk Tanaman 3/4" Buah 45,000
4 Kran Bebek, SKM 10 JC Buah 45,500
5 Kran Bebek, Sobar 10 JC Buah 147,200
6 Kran Bebek, Fio 10 JC Buah 95,600
Kunci
1 Kunci Kuda Terbang 2x Putar Buah 73,700
2 Kunci Kunci Tanam Aluminium Buah 402,300
3 Kunci Kunci Tanam Biasa Buah 75,000
4 Kunci Kunci Tanam Kamar Mandi Buah 47,050
5 Kunci Mortus Cylinder - Basket 50 mm Unit 201,100
6 Handle Solid HRE 6141 Pasang 125,000
Hak Angin
1 Hak Angin Biasa set 9,800
2 Hak Angin Kuningan set 20,000
3 Kait Angin set 18,100
4 Hak Angin Lurus Kuningan Set 20,000
Bahan Penggantung dan Pengunci
1 Door Holder Set 86,800
2 Door Kloser Set 186,300
3 Door Stop Set 129,250
4 Rel Pintu Dorong Set 150,000
5 Penyangga Jendela Biasa Buah 14,900
6 Rel Pintu Dorong Uk. 90 Buah 135,000

62
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

Bahan Pembersih
1 Sabun Colek Wing Biru 5kg Timba 29,650
ALAT LISTRIK
KABEL
Kabel NYA
1 Kabel NYA Supreme, 2 x 2,5 mm m 9,000
2 Kabel NYA Supreme, 1 x 2.5 mm m 4,000
Kabel NYM
1 Kabel NYM Supreme 2 x 1.5 mm m 8,500
2 Kabel NYM Supreme, 2 x 2.5 mm m 13,000
Kabel NYY
1 Kabel NYY Supreme, 2 X 4 mm m 21,000
2 Kabel NYY Supreme, 4 X 2,5 mm m 23,000
3 Kabel NYY Supreme, 4 X 10 mm m 56,500
Kabel TC & Twisted
1 Kabel TC & Twisted Twisted 2x10 Mm m 9,100
2 Kabel TC & Twisted Twisted 2x16 Mm m 16,000
3 Kabel TC & Twisted Twisted 4x16 Mm m 25,800
Kabel Tray
1 Kabel Tray Lebar 100 x Tinggi 50 x Panjang 2400 x Ketebalan Roll 115,000
2 Kabel Tray Plat
150 x1,2
50mm
x 2400 x 1,2 mm Roll 151,800
3 Kabel Tray 200 x 50 x 2400 x 1,2 mm Roll 166,700
4 Kabel Tray 300 x 50 x 2400 x 1,2 mm Roll 207,000
5 Kabel Tray 400 x 50 x 2400 x 1,2 mm Roll 248,500
6 Kabel Tray 500 x 50 x 2400 x 1,2 mm Roll 295,500
7 Kabel Tray 150 x 100 x 2400 x 1,2 mm Roll 187,400
8 Kabel Tray 200 x 100 x 2400 x 1,2 mm Roll 207,000
9 Kabel Tray 300 x 100 x 2400 x 1,2 mm Roll 253,000
10 Kabel Tray 400 x 100 x 2400 x 1,2 mm Roll 295,500
11 Kabel Tray 500 x 100 x 2400 x 1,2 mm Roll 341,500
LAMPU
Lampu Pijar
1 Lampu Pijar Umum Philips, Clear 25 Watt Buah 5,900
Lampu TL
1 Lampu TL Philips, 18 watt Buah 35,000
2 Lampu TL Philips, 20 Watt + Kap Unit 86,250
3 Lampu TL Philips, 40 Watt + Kap Unit 120,750
Lampu Essential
1 Lampu Essential Philips, 18 watt Buah 36,800
2 Lampu Essential Philips, 23 watt Buah 42,500
3 Lampu SL Philips, 23 Watt Buah 50,600
4 Lampu SL Philips, 14 Watt Buah 40,700
Lampu Lainnya
1 Lampu RM 2 x 36 Watt, Fatro Unit 344,950
2 Lampu RM 2 x 18 Watt, Fatro Unit 287,450
3 Lampu Baret Kotak 32 Watt Buah 247,500
4 Lampu RM 2 x 36 Watt, Artolite Set 665,500
5 Lampu RM 2 x 18 Watt, Artolite Set 431,200
6 Lampu RM 2 x 36 Watt, Saka, Sui, Tap Set 597,850
7 Lampu RM 2 x 18 Watt, Saka Sui, Tap Set 391,160
8 Lampu Spot Light General Bright LED Flood Light - 100 W / IP65 Buah 522,500
9 Lampu Spot Light General Bright LED Flood Light - 80 W / IP65 Buah 412,500

63
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

10 Lampu Spot Light General Bright LED Flood Light - 50 W / IP65 Buah 291,500
11 Lampu Spot Light General Bright LED Flood Light - 30 W / IP65 Buah 192,500
12 Lampu Spot Light General Bright LED Flood Light - 20 W / IP65 Buah 170,500
13 Lampu Spot Light General Bright LED Flood Light - 10 W / IP65 Buah 82,500
14 Lampu Spot Light General LED Flood Light Driver & LED CHIP - 100 W Buah 291,500
15 Lampu Spot Light General LED Flood Light Driver & LED CHIP - 80 W Buah 225,500
16 Lampu Spot Light General LED Flood Light Driver & LED CHIP - 50 W Buah 159,500
17 Lampu Spot Light General LED Flood Light Driver & LED CHIP - 30 W Buah 104,500
18 Lampu Spot Light General LED Flood Light Driver & LED CHIP - 20 W Buah 82,500
19 Lampu Spot Light General LED Flood Light Driver & LED CHIP - 10 W Buah 38,500
20 Lampu Downlight SM D 150 E27 PL ESS 18W, Artolite Unit 310,600
21 Lampu Downlight RD 150 E27 SAVY PL ESS 18W, Artolite Unit 195,700
Stop Kontak
1 Stop Kontak Broco, 2 Port Unit 15,800
Saklar
1 Saklar Broco, Ganda Buah 15,700
2 Saklar Broco, Engkel IB Buah 11,500
Fitting
1 Fitting Plafon Buah 3,750
MCB
1 MCB 10A, 3 Phase Schneider Buah 211,400
Bahan Listrik Lainnya
1 Isolator / Isolasi Plastik Roll 10,100
2 Klem PVC Buah 2,850
PERPIPAAN
PIPA PVC/UPVC
Pipa PVC
1 Pipa PVC buta dia = 12" klas VP AWS 10 m' 569,200
2 Pipa PVC buta dia = 6" klas VP AWS 10 m' 248,000
3 Pipa PVC Maspion AW 1 1/2" X 6 m Batang 121,600
4 Pipa PVC Maspion AW 1 1/4" X 6 m Batang 93,400
5 Pipa PVC Maspion AW 1" X 4 m Batang 44,000
6 Pipa PVC Maspion AW 1" X 6 m Batang 65,900
7 Pipa PVC Maspion AW 1 1/4" X 4 m Batang 62,200
8 Pipa PVC Maspion AW 1 1/2" X 4 m Batang 81,000
9 Pipa PVC Maspion AW 1/2" X 4 m Batang 28,700
10 Pipa PVC Maspion AW 1/2" X 6 m Batang 43,000
11 Pipa PVC Maspion AW 10" X 4 m Batang 1,480,000
12 Pipa PVC Maspion AW 10" X 6 m Batang 2,220,100
13 Pipa PVC Maspion AW 12" X 4 m Batang 2,114,900
14 Pipa PVC Maspion AW 12" X 6 m Batang 3,172,400
15 Pipa PVC Maspion AW 14" X 4 m Batang 1,898,000
16 Pipa PVC Maspion AW 14" X 6 m Batang 4,463,300
17 Pipa PVC Maspion AW 16" X 4 m Batang 3,719,300
18 Pipa PVC Maspion AW 16" X 6 m Batang 5,301,200
19 Pipa PVC Maspion AW 2 1/2" X 6 m Batang 231,800
20 Pipa PVC Maspion AW 2" X 4 m Batang 120,400
21 Pipa PVC Maspion AW 2" X 6 m Batang 180,500
22 Pipa PVC Maspion AW 2 1/2" X 4 m Batang 154,500
23 Pipa PVC Maspion AW 3" X 4 m Batang 220,500
24 Pipa PVC Maspion AW 3" X 6 m Batang 330,700
25 Pipa PVC Maspion AW 3/4" X 4 m Batang 29,000
26 Pipa PVC Maspion AW 3/4" X 6 m Batang 52,300

64
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

27 Pipa PVC Maspion AW 4" X 4 m Batang 321,300


28 Pipa PVC Maspion AW 4" X 6 m Batang 481,900
29 Pipa PVC Maspion AW 5" X 4 m Batang 505,700
30 Pipa PVC Maspion AW 5" X 6 m Batang 760,100
31 Pipa PVC Maspion AW 6" X 4 m Batang 669,800
32 Pipa PVC Maspion AW 6" X 6 m Batang 1,004,700
33 Pipa PVC Maspion AW 8" x 4 m Batang 1,041,700
34 Pipa PVC Maspion AW 8" X 6 m Batang 1,562,600
35 Pipa PVC Maspion C 1 1/2" X 4 m Batang 33,700
36 Pipa PVC Maspion C 1 1/2" X 6 m Batang 45,400
37 Pipa PVC Maspion C 1 1/4" X 4 m Batang 25,300
38 Pipa PVC Maspion C 1 1/4" X 6 m Batang 38,000
39 Pipa PVC Maspion C 1" X 4 m Batang 20,000
40 Pipa PVC Maspion C 1" X 6 m Batang 30,100
41 Pipa PVC Maspion C 2 1/2" X 4 m Batang 61,000
42 Pipa PVC Maspion C 2 1/2" X 6 m Batang 91,500
43 Pipa PVC Maspion C 2" X 4 m Batang 48,100
44 Pipa PVC Maspion C 2" X 6 m Batang 72,200
45 Pipa PVC Maspion C 3" X 4 m Batang 70,800
46 Pipa PVC Maspion C 3" X 6 m Batang 106,200
47 Pipa PVC Maspion C 3/4" X 4 m Batang 13,600
48 Pipa PVC Maspion C 3/4" X 6 m Batang 20,400
49 Pipa PVC Maspion C 4" X 4 m Batang 91,300
50 Pipa PVC Maspion C 4" X 6 m Batang 136,900
51 Pipa PVC Maspion C 5/8" X 4 m Batang 7,500
52 Pipa PVC Maspion C 5/8" X 6 m Batang 11,200
53 Pipa PVC Maspion D 2 1/2" X 6 m Batang 127,700
54 Pipa PVC Maspion D 1 1/2" X 6 m Batang 65,900
55 Pipa PVC Maspion D 1 1/4" X 6 m Batang 58,100
56 Pipa PVC Maspion D 1 1/4" X 4 m Batang 38,700
57 Pipa PVC Maspion D 1 1/2" X 4 m Batang 44,000
58 Pipa PVC Maspion D 10" X 4 m Batang 1,063,300
59 Pipa PVC Maspion D 10" X 6 m Batang 1,595,000
60 Pipa PVC Maspion D 12" X 4 m Batang 1,449,300
61 Pipa PVC Maspion D 12" X 6 m Batang 2,173,900
62 Pipa PVC Maspion D 14" x 4 m Batang 1,898,000
63 Pipa PVC Maspion D 14" X 6 m Batang 2,847,100
64 Pipa PVC Maspion D 16" x 4 m Batang 2,456,800
65 Pipa PVC Maspion D 16" X 6 m Batang 3,685,300
66 Pipa PVC Maspion D 2" X 4 m Batang 57,500
67 Pipa PVC Maspion D 2" X 6 m Batang 86,200
68 Pipa PVC Maspion D 2 1/2" X 4 m Batang 85,100
69 Pipa PVC Maspion D 20" x 4 m Batang 4,243,900
70 Pipa PVC Maspion D 20" X 6 m Batang 6,366,000
71 Pipa PVC Maspion D 3" X 4 m Batang 123,500
72 Pipa PVC Maspion D 3" X 6 m Batang 185,200
73 Pipa PVC Maspion D 4" X 4 m Batang 173,600
74 Pipa PVC Maspion D 4" X 6 m Batang 260,400
75 Pipa PVC Maspion D 5" X 4 m Batang 283,600
76 Pipa PVC Maspion D 5" X 6 m Batang 425,400
77 Pipa PVC Maspion D 6" X 4 m Batang 344,500
78 Pipa PVC Maspion D 6" X 6 m Batang 516,700
79 Pipa PVC Maspion D 8" X 4 m Batang 609,300
80 Pipa PVC Maspion D 8" X 6 m Batang 913,900

65
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

81 Pipa PVC Dia 1" S-12,5 @ 6m Batang 47,300


82 Pipa PVC Dia 1 1/2" S-12,5 @ 6m Batang 83,000
83 Pipa PVC Dia 10" S-12,5 @ 6m AW Batang 1,776,000
84 Pipa PVC Dia 2" S-12,5 @ 6m Batang 153,800
85 Pipa PVC Dia 2 1/2" S-12,5 @ 6m Batang 169,800
86 Pipa PVC Dia 3" S-12,5 @ 6m Batang 318,900
87 Pipa PVC Dia 3/4" S-12,5 @ 6m Batang 40,600
88 Pipa PVC Dia 4" S-12,5 @ 6m Batang 499,000
89 Pipa PVC Dia 6" S-12,5 @ 6m Batang 1,039,700
90 Pipa PVC Dia 8" S-12,5 @ 6m AW Batang 1,238,600
91 Pipa PVC screen dia = 6" klas VP AWS 10 m' 323,200
Pipa Galvanis (Air Tuang)
1 Pipa Galvanis Dia 2 - 1/2" @ 6m Kelas B Batang 674,000
2 Pipa Galvanis Dia 3" @ 6m Kelas B Batang 793,500
3 Pipa Galvanis Dia 4" @ 6m Kelas B Batang 1,051,350
4 Pipa Galvanis Dia 5" @ 6m Kelas B Batang 1,482,100
5 Pipa Galvanis Dia 6" @ 6m Kelas B Batang 1,798,050
6 Pipa Galvanis Dia 1/2" @ 6m Kelas A Batang 150,550
7 Pipa Galvanis Dia 3/4" @ 6m Kelas A Batang 191,550
8 Pipa Galvanis Dia 1" @ 6m Kelas A Batang 249,650
9 Pipa Galvanis Dia 1 - 1/4" @ 6m Kelas A Batang 319,000
10 Pipa Galvanis Dia 1 - 1/2" @ 6m Kelas A Batang 396,200
11 Pipa Galvanis Dia 2" @ 6m Kelas A Batang 532,000
12 Pipa Galvanis Dia 2 - 1/2" @ 6m Kelas A Batang 733,750
13 Pipa Galvanis Dia 3" @ 6m Kelas A Batang 861,700
14 Pipa Galvanis Dia 4" @ 6m Kelas A Batang 1,223,700
15 Pipa Galvanis Dia 5" @ 6m Kelas A Batang 1,752,750
16 Pipa Galvanis Dia 6" @ 6m Kelas A Batang 2,088,450
17 Pipa Galvanis Dia 8" @ 6m Kelas A Batang 3,509,250
18 Pipa Galvanis Dia 1/2" @ 6m Medium B Batang 153,050
19 Pipa Galvanis Dia 3/4" @ 6m Medium B Batang 189,000
20 Pipa Galvanis Dia 1" @ 6m Medium B Batang 289,950
21 Pipa Galvanis Dia 1 - 1/4" @ 6m Medium B Batang 374,250
22 Pipa Galvanis Dia 1 - 1/2" @ 6m Medium B Batang 444,000
23 Pipa Galvanis Dia 2" @ 6m Medium B Batang 658,450
24 Pipa Galvanis Dia 2 - 1/2" @ 6m Medium B Batang 840,850
25 Pipa Galvanis Dia 3" @ 6m Medium B Batang 1,041,500
26 Pipa Galvanis Dia 4" @ 6m Medium B Batang 1,507,100
27 Pipa Galvanis Dia 5" @ 6m Medium B Batang 1,950,300
28 Pipa Galvanis Dia 6" @ 6m Medium B Batang 2,356,700
29 Pipa Galvanis Dia 1/2" @ 6m Medium A Batang 186,000
30 Pipa Galvanis Dia 3/4" @ 6m Medium A Batang 238,950
31 Pipa Galvanis Dia 1" @ 6m Medium A Batang 366,400
32 Pipa Galvanis Dia 1 - 1/4" @ 6m Medium A Batang 483,600
33 Pipa Galvanis Dia 1 - 1/2" @ 6m Medium A Batang 555,600
34 Pipa Galvanis Dia 2" @ 6m Medium A Batang 758,100
35 Pipa Galvanis Dia 2 - 1/2" @ 6m Medium A Batang 966,950
36 Pipa Galvanis Dia 3" @ 6m Medium A Batang 1,249,150
37 Pipa Galvanis Dia 4" @ 6m Medium A Batang 1,808,450
38 Pipa Galvanis Dia 5" @ 6m Medium A Batang 2,433,850
39 Pipa Galvanis Dia 6" @ 6m Medium A Batang 2,897,400
40 Pipa Galvanis Dia 8" @ 6m Medium A Batang 4,161,850
Pipa Stainless
1 Pipa Stainless Dia 5/8" @ 6m (heinse Merah) Batang 305,450

66
NO NAMA BARANG MERK / UKURAN SATUAN HPS 2018

2 Pipa Stainless Dia 1 1/4" @ 6m (heinse Merah) Batang 357,200


3 Pipa Stainless Dia 1 1/2" @ 6m (heinse Merah) Batang 426,050
4 Pipa Stainless Dia 2" @ 6m (heinse Merah) Batang 651,600
Reducer
1 Reducer PVC All Flange Dia 12" x 6" Buah 690,200
Tee
1 Tee Maspion, TS 1" Buah 3,150
Bahan Konstruksi Lain
1 Bahan Pengkilap Lantai Liter 40,250
2 Floor Drain Aluminium / Stainless Buah 51,900
3 Ijuk m2 23,250
4 Las Doof buah 500
5 L Bow buah 5,500
6 Klem buah 550
7 Mangkok buah 2,500
8 Seal Tape Pelapis Pemasang Kran Biji 2,650
9 Soda Api Soda Api (Hcl) Kg 17,150
10 Dinabolt buah 2,000
11 Stopper/uskup buah 78,350
12 Kapi Cat RRT 2" buah 5,950
13 Tanaman Rumput Jepang m2 25,000
14 Tanaman Pucuk Merah tinggi 1 m Batang 50,000
15 Tanaman Taiwan Beauty Putih Batang 5,500
16 Tanaman Semak Hias m2 50,000

67
2018 ZONA
1 Kes

13,800
13,800
2,300
19,700
15,600
16,100
2,100
17,000

46,800
57,400
42,300
56,300
14,550

760,000
780,000
800,000
820,000
850,000
900,000
950,000
1,000,000
1,060,000

36,800
17,850
161,000
230,600
312,850
92,500
123,300
97,500
123,750
106,850
151,050
1,189,900
2,172,900
655,000
750,000
825,000

302,000
302,000
175,000
75,000
134,250
90,000

68
2018 ZONA
1 Kes

81,400
700
6,000
143,750
103,500
115,800
98,300
96,100
21,800
9,900
8,000
136,600
141,700
258,700
262,900
252,950
139,850
236,200
181,200

25,200
39,800
121,000
208,600
50,600
35,100
25,400
3,300
41,700
41,700
60,000
185,750
61,550
60,650
28,200
28,000
11,700
58,950
27,000
36,000
40,500
4,600
53,150
14,400
110,750
99,600
55,900
57,000
28,600
12,000
39,400
89,000
96,100

69
2018 ZONA
1 Kes

41,000
112,500
185,750
77,500
55,250

70
2018 ZONA
1 Kes

50,350
191,350
861,450

89,700
53,100
54,000
77,000
46,250
139,700
103,500
113,800
26,500
17,300
20,900
42,300
65,700
8,700
20,000
41,800
30,000
46,500

35,000
45,000
50,000
72,900
77,000

13,000
110,000
242,250
145,450
201,400
272,450
12,750
12,750
29,100
212,950
79,000
33,000
151,500
12,750

10,500
11,000
18,100
27,000
20,250
86,000
86,000
109,650
147,000

71
2018 ZONA
1 Kes

175,000
250,000

72
2018 ZONA
1 Kes

400,000

6,000
8,900
6,750
14,750
24,000
8,800
11,000
4,600
5,500
8,600
5,500
10,000
2,100
1,350
9,400
52,800
13,800
35,300

79,900
95,100
105,900

48,000
60,700
70,000
93,100
65,000
111,300
71,400
100,000
123,100
161,100
22,000
23,900
33,900
36,200
41,900

584,700
73,900
25,900
4,500
104,650
103,000
107,700
120,000
63,700
650,000
110,000
57,500

73
2018 ZONA
1 Kes

5,000
4,900

51,000
65,000
67,000
37,000
42,000
50,000
58,000
68,000
80,500
74,100
85,100
20,000
106,200
53,100
73,900
25,650
50,000
33,000

67150
33600

1,459,900
152,800
109,800
2,200,000

108,550

191,700
352,400
546,200
931,200

700,900
357,300
595,600
201,650

410,700
35,000
347,100
410,700

11,000

466,300
524,600

74
2018 ZONA
1 Kes

282,800
900
54,250
57,950
55,300
56,900
25,000
52,600
45,500
50,600
23,500
56,200
60,450
230,500
307,400
163,800
208,300
238,800
93,000
103,000
95,000
105,000
160,000
125,000
130,000
102,000

8,000
12,350
18,450
18,600
22,750

14,100
8,150
34,100

563,000
315,600
457,400
237,700
245,300
218,100

22,200
24,450
15,850

1,100
200

589,400
330,700

75
2018 ZONA
1 Kes

539,850
272,100
231,600
1,251,900

188,300

300

76
2018 ZONA
1 Kes

109,350

93,300
61,700
17,200

51,600
60,000
118,300
46,400
68,950
315,000

12,400
13,500
16,000
16,800
24,300
27,100

10,100
28,200
64,090
105,272
103,100
119,700
131,300
150,700
18,600
103,500
60,700
75,900
88,000
105,000
108,000
130,000
130,000
76,500
96,500
101,500
126,500

19,550

21,550
3,564,050
3,000,000
18,009,150
18,009,150
7,873,350
13,031,500
13,446,700

77
2018 ZONA
1 Kes

18,009,150
12,071,750
12,646,600
10,922,050
8,622,700
9,772,350
7,248,050
7,137,500
5,537,700
7,686,600
6,523,200
5,386,100
5,386,100
5,565,700
5,075,300
95,000
150,000
95,400
129,000
124,600
75,500
114,700
126,100
55,300
80,000
88,650
100,700

1,336,500
356,800
538,000
352,400
197,600
323,900
1,403,000
1,604,000
210,500
236,800
289,500
223,700
644,800
1,862,500
1,070,900

7,350
9,250
5,750

40,000

10,200

78
2018 ZONA
1 Kes

15,750
15,800
21,600
25,000
275,000

24,500
744,500
24,700
28,000
21,500
35,000
17,000
18,700
15,000
33,300

106,600

20,000
10,000
6,000
18,500
60,000
20,000

17,500
13,500
45,000
45,500
147,200
95,600

73,700
402,300
75,000
47,050
201,100
125,000

9,800
20,000
18,100
20,000

86,800
186,300
129,250
150,000
14,900
135,000

79
2018 ZONA
1 Kes

29,650

9,000
4,000

8,500
13,000

21,000
23,000
56,500

9,100
16,000
25,800

115,000
151,800
166,750
207,000
248,500
295,500
187,400
207,000
254,100
295,500
341,500

5,900

35,000
86,250
120,750

36,800
42,500
50,600
40,700

344,950
287,450
247,500
665,500
431,200
597,850
391,160
522,500
412,500

80
2018 ZONA
1 Kes

291,500
192,500
170,500
82,500
291,500
225,500
159,500
104,500
82,500
38,500
310,600
195,700

15,800

15,700
11,500

3,750

211,400

10,100
2,850

569,200
248,000
121,600
93,400
44,000
65,900
62,200
81,000
28,700
43,000
1,480,000
2,220,100
2,114,900
3,172,400
1,898,000
4,463,300
3,719,300
5,301,200
231,800
120,400
180,500
154,500
220,500
330,700
29,000
52,300

81
2018 ZONA
1 Kes

321,300
481,900
505,700
760,100
669,800
1,004,700
1,041,700
1,562,600
33,700
45,400
25,300
38,000
20,000
30,100
61,000
91,500
48,100
72,200
70,800
106,200
13,600
20,400
91,300
136,900
7,500
11,200
127,700
65,900
58,100
38,700
44,000
1,063,300
1,595,000
1,449,300
2,173,900
1,898,000
2,847,100
2,456,800
3,685,300
57,500
86,200
85,100
4,243,900
6,366,000
123,500
185,200
173,600
260,400
283,600
425,400
344,500
516,700
609,300
913,900

82
2018 ZONA
1 Kes

47,300
83,000
1,776,000
153,800
169,800
318,900
40,600
499,000
1,039,700
1,238,600
323,200

674,000
793,500
1,051,350
1,482,100
1,798,050
150,550
191,550
249,650
319,000
396,200
532,000
733,750
861,700
1,223,700
1,752,750
2,088,450
3,509,250
153,050
189,000
289,950
374,250
444,000
658,450
840,850
1,041,500
1,507,100
1,950,300
2,356,700
186,000
238,950
366,400
483,600
555,600
758,100
966,950
1,249,150
1,808,450
2,433,850
2,897,400
4,161,850

305,450

83
2018 ZONA
1 Kes

357,200
426,050
651,600

690,200

3,150

40,250
51,900
23,250
500
5,500
550
2,500
2,650
17,150
2,000
78,350
5,950
25,000
50,000
5,500
50,000

84
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )

13,800 1 12,420 12,400 13,800 13,800


13,800 1 12,420 12,400 13,800 13,800
2,300 1 2,070 2,000 2,300 2,300
19,700 1 17,730 17,700 19,700 19,700
15,600 1 14,040 14,000 15,600 15,600
16,100 1 14,490 14,400 16,100 16,100
2,100 1 1,890 1,800 2,100 2,100
17,000 1 15,300 15,300 17,000 17,000

52,050 1 42,120 42,100 46,000 69,000 69,000


63,800 1 51,660 51,600 55,000 83,950 83,950
47,000 1 38,070 38,000 41,500 67,850 67,850
62,650 1 50,670 50,600 54,500 80,500 80,500
14,550 1 13,095 13,000 14,200 13,800 13,800

760,000
780,000
800,000
820,000
850,000
900,000
950,000
1,000,000
1,060,000

36,800 1 33,120 33,100 36,800 36,800


17,850 1 16,065 16,000 17,850 17,850
161,000 1 144,900 144,900 200,000 161,000 161,000
230,600 1 207,540 207,500 275,000 230,600 230,600
312,850 1 281,565 281,500 325,000 312,850 312,850
101,250 1 83,250 83,200 92,500 101,250 101,250
129,350 1 110,970 110,900 123,300 129,350 129,350
98,150 1 87,750 87,700 97,500 98,150 98,150
123,750 1 111,375 111,300 131,200 123,750 123,750
165,000 1 96,165 96,100 162,500
151,050 1 135,945 135,900 146,250 146,250
1,322,150 1 1,070,910 1,070,900 1,322,150 1,322,150
2,414,350 1 1,955,610 1,955,600 2,414,350 2,414,350
655,000 1 589,500 589,500 731,050 731,050
750,000
825,000 1 742,500 742,500 1,630,800 1,630,800

335,650 1 271,800 271,800 375,000 300,000 300,000


335,650 1 271,800 271,800 300,000 295,000 295,000
224,950 1 157,500 157,500 224,950 224,950
85,500 1 67,500 67,500 62,500 80,000 75,000
134,250 1 120,825 120,800 187,500 126,500 126,500
90,000 1 81,000 81,000 90,000 90,000

85
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )

90,500 1 73,260 73,200 87,000 87,000


780 1 630 600 700 750 750
6,350 1 5,400 5,400 6,000 6,350 6,350
143,750 1 129,375 129,300 145,000 143,750 143,750
115,000 1 93,150 93,100 115,000 115,000
128,700 1 104,220 104,200 122,850 122,850
109,250 1 88,470 88,400 109,250 109,250
106,850 1 86,490 86,400 109,250 109,250
24,300 1 19,620 19,600 18,500 24,300 24,300
11,000 1 8,910 8,900 22,500 10,050 10,050
8,550 1 7,200 7,200 8,000 7,800 7,800
151,800 1 122,940 122,900 151,800 151,800
157,500 1 127,530 127,500 157,500 157,500
287,450 1 232,830 232,800 287,450 287,450
262,900 1 236,610 236,600 283,300 258,700 258,700
252,950 1 227,655 227,600 265,000 252,950 252,950
139,850 1 125,865 125,800 177,500 129,950 129,950
236,200 1 212,580 212,500 265,000 236,200 236,200
201,400 1 163,080 163,000 191,200 191,200

28,000 1 22,680 22,600 55,200 55,200


44,300 1 35,820 35,800 44,300 44,300
134,500 1 108,900 108,900 134,500 134,500
231,850 1 187,740 187,700 95,450 95,450
56,250 1 45,540 45,500 60,200 60,200
39,050 1 31,590 31,500 39,050 39,050
28,250 1 22,860 22,800 25,900 25,900
3,700 1 2,970 2,900 3,700 3,700
46,400 1 37,530 37,500 27,500 27,500
46,400 1 37,530 37,500 26,300 26,300
66,700 1 54,000 54,000 66,700 66,700
203,050 1 167,175 167,100 185,750 187,050 187,050
61,550 1 55,395 55,300 63,100 61,500 61,500
60,650 1 54,585 54,500 61,300 59,800 59,800
29,650 1 25,380 25,300 28,200 28,550 28,550
28,000 1 25,200 25,200 42,500 27,600 27,600
11,700 1 10,530 10,500 17,600 10,700 10,700
58,950 1 53,055 53,000 58,950 58,950
30,750 1 24,300 24,300 27,000 30,750 30,750
36,050 1 32,400 32,400 36,050 36,050
40,500 1 36,450 36,400 54,300 37,150 37,150
5,200 1 4,140 4,100 5,200 5,200
53,150 1 47,835 47,800 60,000 51,250 51,250
17,850 1 12,960 12,900 14,400 12,650 12,650
124,500 1 99,675 99,600 110,750 114,200 114,200
113,000 1 89,640 89,600 99,600 17,450 17,450
62,220 1 50,310 50,300 90,950 90,950
59,220 1 51,300 51,300 57,000 78,050 78,050
31,850 1 25,740 25,700 27,300 31,050 31,050
12,800 1 10,800 10,800 12,000 11,700 11,700
39,400 1 35,460 35,400 55,000 39,400 39,400
97,560 1 80,100 80,100 89,000 128,000 128,000
106,820 1 86,490 86,400 142,600 142,600

86
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
47,440 1 36,900 36,900 41,000 57,550 57,550
125,000 1 101,250 101,200
203,050 1 167,175 167,100 187,050 187,050
77,500
55,250

87
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )

50,350 1 45,315 45,300 49,500 46,600 46,600


191,350 1 172,215 172,200 190,000 188,650 188,650
861,450 1 775,305 775,300 975,000 850,800 850,800

89,700 1 80,730 80,700 82,300 89,700 89,700


59,050 1 47,790 47,700 59,050 59,050
86,250 1 48,600 48,600 86,250 86,250
97,900 1 69,300 69,300 120,750 120,750
78,200 1 41,625 41,600 78,200 78,200
155,250 1 125,730 125,700 155,250 155,250
115,000 1 93,150 93,100 115,000 115,000
126,500 1 102,420 102,400 126,500 126,500
29,550 1 23,850 23,800 27,600 27,600
19,300 1 15,570 15,500 19,300 19,300
23,250 1 18,810 18,800 23,250 23,250
47,000 1 38,070 38,000 38,000 46,200 46,200
73,100 1 59,130 59,100 73,100 73,100
9,750 1 7,830 7,800 9,750 9,750
34,150 1 18,000 18,000 34,150 34,150
46,450 1 37,620 37,600 46,450 46,450
48,250 1 27,000 27,000 48,250 48,250
51,700 1 41,850 41,800 51,700 51,700

57,350 1 31,500 31,500 41,800 57,350 57,350


63,350 1 40,500 40,500 55,000 62,250 62,250
70,400 1 45,000 45,000 69,550 69,550
81,000 1 65,610 65,600 76,900 76,900
85,600 1 69,300 69,300 84,200 84,200

13,000 1 11,700 11,700 15,000 14,500


110,000 1 99,000 99,000 100,050 100,050
242,250 1 218,025 218,000 231,800 231,800
145,450 1 130,905 130,900 140,650 140,650
201,400 1 181,260 181,200 187,750 187,750
272,450 1 245,205 245,200 272,450 272,450
14,500 1 11,475 11,400 14,500 14,250
14,300 1 11,475 11,400 14,300 14,250
29,100 1 26,190 26,100 29,100 29,100
212,950 1 191,655 191,600 212,950 212,950
79,000 1 71,100 71,100 81,500 33,750 33,750
33,000 1 29,700 29,700 20,250 20,250
151,500
14,000 1 11,475 11,400 14,000 13,750

13,250 1 9,450 9,400 9,100 13,250 13,100


13,500 1 9,900 9,900 9,900 13,500 13,300
20,150 1 16,290 16,200 176,700 169,900
27,000 1 24,300 24,300 32,700 99,788 95,950
20,250 1 18,225 18,200 22,500 87,880 84,500
86,000 1 77,400 77,400 125,000 80,000
86,000 1 77,400 77,400 125,000 75,000
109,650 1 98,685 98,600 150,000 95,000
147,000 1 132,300 132,300 225,000 125,000

88
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
175,000 1 157,500 157,500 175,000
250,000 1 225,000 225,000 250,000

89
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )

453,450 1 360,000 360,000 400,000 358,750 358,750

6,750 1 5,400 5,400 6,600 6,600


9,950 1 8,010 8,000 9,450 9,450
6,750 1 6,075 6,000 7,600 6,750 6,750
14,750 1 13,275 13,200 15,700 14,750 14,750
24,000
8,800 1 7,920 7,900 8,800 8,800
11,000 1 9,900 9,900 11,000 11,000
4,600 1 4,140 4,100 5,200 4,500 4,500
5,500

10,400 1 9,000 9,000 10,000 10,400 10,400


2,300 1 1,890 1,800 2,100 2,300 2,300
1,350 1 1,215 1,200 1,350 1,350
10,550 1 8,460 8,400 10,550 10,550
58,700 1 47,520 47,500 58,700 58,700
13,800 1 12,420 12,400 13,800 13,800
35,300 1 31,770 31,700 35,300 35,300

88,800 1 71,910 71,900 88,800 88,800


105,750 1 85,590 85,500 105,750 105,750
117,750 1 95,310 95,300 117,750 117,750

53,400 1 43,200 43,200 38,200 53,400 53,400


67,500 1 54,630 54,600 56,300 67,500 67,500
84,550 1 63,000 63,000 67,600 84,550 84,550
103,500 1 83,790 83,700 90,000 103,500 103,500
65,000
123,750 1 100,170 100,100 95,000 123,750 123,750
79,350 1 64,260 64,200 79,350 79,350
100,000
123,100 1 110,790 110,700 116,200 119,900 119,900
179,000 1 144,990 144,900 140,000 174,400 174,400
22,000 1 19,800 19,800 22,000 22,000 22,000
26,600 1 21,510 21,500 22,800 26,600 26,600
33,900 1 30,510 30,500 33,800 33,900 33,900
40,250 1 32,580 32,500 25,000 40,250 40,250
46,600 1 37,710 37,700 40,000 46,600 46,600

584,700 1 526,230 526,200 584,700 584,700


73,900 1 66,510 66,500 73,900 73,900
25,900 1 23,310 23,300 25,900 25,900
4,500 1 4,050 4,000 4,450 4,450
104,650 1 94,185 94,100 67,850 67,850
103,000 1 92,700 92,700 54,050 54,050
107,700 1 96,930 96,900 103,700 103,700
120,000 1 108,000 108,000 92,800 92,800
63,700 1 57,330 57,300 63,700 63,700
650,000 1 585,000 585,000 862,300 862,300
110,000
57,500 1 51,750 51,700 57,500 57,500

90
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )

5,600 1 4,500 4,500 4,000 5,200 5,200


5,550 1 4,410 4,400 3,500 5,050 5,050

81,650 1 45,900 45,900 51,000 81,650 81,650


110,700 1 58,500 58,500 65,000 155,250 155,250
140,500 1 60,300 60,300 67,000 140,500 140,500
72,750 1 33,300 33,300 37,000 68,650 68,650
84,550 1 37,800 37,800 42,000 84,550 84,550
65,300 1 45,000 45,000 50,000 64,150 64,150
76,100 1 52,200 52,200 58,000 74,750 74,750
87,050 1 61,200 61,200 68,000 84,400 84,400
89,500 1 72,450 72,400 87,200 87,200
110,700 1 66,690 66,600 74,100 102,350 102,350
94,600 1 76,590 76,500 94,600 94,600
22,400 1 18,000 18,000 20,000 22,000 22,000
118,100 1 95,580 95,500 118,100 118,100
59,050 1 47,790 47,700 59,050 59,050
82,150 1 66,510 66,500 82,150 82,150
25,650 1 23,085 23,000 25,650 25,650
60,400 1 45,000 45,000 50,000 60,400 60,400
38,550 1 29,700 29,700 33,000 38,550 38,550

67150 0.9 60435 60400 67,150 67,150


33600 0.9 30240 30200 33,600 33,600

1,622,150 1 1,313,910 1,313,900 1,629,150 1,629,150


165,550 1 137,520 137,500 152,800 151,850 151,850
109,850 1 98,820 98,800 109,850 109,850
2,595,450 1 1,980,000 1,980,000 2,200,000 2,659,850 2,659,850

108,550 1 97,695 97,600 125,000 103,450 103,450

213,050 1 172,530 172,500 195,450 195,450


391,600 1 317,160 317,100 274,550 274,550
606,950 1 491,580 491,500 372,050 372,050
1,034,750 1 838,080 838,000 1,034,750 1,034,750

700,900 1 630,810 630,800 700,900 700,900


363,600 1 321,570 321,500 357,300 357,300
595,650 1 536,040 536,000 595,650 595,650
201,650 1 181,485 181,400 215,667 201,650 201,650

456,400 1 369,630 369,600


35,000 30,550 30,550
385,750 1 312,390 312,300 385,750 385,750
456,400 1 369,630 369,600 456,400 456,400

11,000 1 9,900 9,900 11,000 11,000

518,150 1 419,670 419,600 518,150 518,150


582,900 1 472,140 472,100 582,900 582,900

91
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
314,250 1 254,520 254,500 314,250 314,250
1,100 1 810 800 1,000 1,000
54,250 1 48,825 48,800 50,000 52,050 52,050
57,950 1 52,155 52,100 55,000 57,950 57,950
61,550 1 49,770 49,700 55,000 57,500 57,500
63,250 1 51,210 51,200 55,000 63,250 63,250
32,450 1 22,500 22,500 23,000 32,450 32,450
58,500 1 47,340 47,300 47,500 58,500 58,500
50,650 1 40,950 40,900 42,000 50,650 50,650
56,250 1 45,540 45,500 46,000 56,250 56,250
23,500 1 21,150 21,100 23,000 21,850 21,850
62,500 1 50,580 50,500 62,500 62,500
60,450 1 54,405 54,400 61,200 83,950 83,950
230,500
307,400
163,800
208,300
238,800
93,000
103,000
95,000
105,000
160,000
125,000
130,000
102,000

8,000 1 7,200 7,200 7,350 7,350


12,350 1 11,115 11,100 11,650 11,650
18,450 1 16,605 16,600 16,900 16,900
18,600 1 16,740 16,700 18,600 18,600
22,750 1 20,475 20,400 20,850 20,850

15,750 1 12,690 12,600 13,300 15,750 15,750


8,150 1 7,335 7,300 12,400 9,000 9,000
37,950 1 30,690 30,600 30,600 37,950 37,950

625,650 1 506,700 506,700 573,950 573,950


350,750 1 284,040 284,000 323,900 323,900
508,250 1 411,660 411,600 466,350 466,350
264,200 1 213,930 213,900 242,350 242,350
272,650 1 220,770 220,700 250,100 250,100
242,350 1 196,290 196,200 242,350 242,350

24,750 1 19,980 19,900 18,000 24,750 24,750


24,450 1 22,005 22,000 24,450 24,450
15,850 1 14,265 14,200 16,200 15,850 15,850

1,300 1 990 900 1,300 1,300


250 1 180 100 165 250

589,400 1 530,460 530,400 589,400 589,400


330,700 1 297,630 297,600 330,700 330,700

92
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
539,850 1 485,865 485,800 539,850 539,850
272,100 1 244,890 244,800 272,100 272,100
326,150 1 208,440 208,400 231,600 304,700 304,700
1,391,050 1 1,126,710 1,126,700 1,391,050 1,391,050

201,200 1 169,470 169,400 188,300 201,200 201,200

-
350 1 270 200 350 350

93
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )

109,350 1 98,415 98,400 109,350 109,350

103,700 1 83,970 83,900 103,700 103,700


68,650 1 55,530 55,500 61,600 75,400 75,400
19,150 1 15,480 15,400 19,150 19,150

68,400 1 46,440 46,400 51,600 68,400 68,400


94,600 1 54,000 54,000 60,000 94,600 94,600
131,450 1 106,470 106,400 131,200 131,200
46,400 1 41,760 41,700 48,700 42,550 42,550
68,950 1 62,055 62,000 74,000 63,250 63,250
315,000

13,800 1 11,160 11,100 13,750 13,750


15,000 1 12,150 12,100 15,000 15,000
17,800 1 14,400 14,400 17,800 17,800
18,700 1 15,120 15,100 18,700 18,700
27,050 1 21,870 21,800 27,050 27,050
30,150 1 24,390 24,300 30,150 30,150

11,250 1 9,090 9,000 14,950 14,950


31,350 1 25,380 25,300 31,350 31,350
64,090
105,272
114,600 1 92,790 92,700 114,600 114,600
133,000 1 107,730 107,700 133,000 133,000
145,900 1 118,170 118,100 145,900 145,900
167,550 1 135,630 135,600 167,550 167,550
20,700 1 16,740 16,700 20,700 20,700
115,000 1 93,150 93,100 115,000 115,000
67,500 1 54,630 54,600 67,500 67,500
84,400 1 68,310 68,300 84,400 84,400
88,000 88,000 88,000
105,000 105,000 105,000
108,000 108,000 108,000
130,000 130,000 130,000
130,000 130,000 130,000
76,500 76,500 76,500
96,500 96,500 96,500
101,500 101,500 101,500
126,500 126,500 126,500

19,550 1 17,595 17,500 19,300 19,550 19,550

21,550 1 19,395 19,300 19,750 19,750


3,564,050 1 3,207,645 3,207,600 3,564,050 3,564,050
3,000,000 1 2,700,000 2,700,000 175,950 175,950
18,009,150 1 16,208,235 16,208,200 10,150,000 18,009,150 18,009,150
18,009,150 1 16,208,235 16,208,200 10,150,000 18,009,150 18,009,150
7,873,350 1 7,086,015 7,086,000 10,250,000 7,873,350 7,873,350
13,031,500 1 11,728,350 11,728,300 10,250,000 13,031,500 13,031,500
13,446,700 1 12,102,030 12,102,000 10,250,000 13,446,700 13,446,700

94
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
18,009,150 1 16,208,235 16,208,200 10,350,000 18,009,150 18,009,150
12,071,750 1 10,864,575 10,864,500 10,350,000 12,071,750 12,071,750
12,646,600 1 11,381,940 11,381,900 10,350,000 12,646,600 12,646,600
10,922,050 1 9,829,845 9,829,800 10,922,050 10,922,050
8,622,700 1 7,760,430 7,760,400 7,930,650 7,930,650
9,772,350 1 8,795,115 8,795,100 9,772,350 9,772,350
7,248,050 1 6,523,245 6,523,200 8,622,700 8,622,700
7,930,650 1 6,423,750 6,423,700 6,000,000 7,930,650 7,930,650
6,153,000 1 4,983,930 4,983,900 5,500,000 6,100,500 6,100,500
8,540,700 1 6,917,940 6,917,900 6,500,000 8,540,700 8,540,700
7,248,050 1 5,870,880 5,870,800 5,500,000 6,100,500 6,100,500
5,984,600 1 4,847,490 4,847,400 5,490,450 5,490,450
5,984,600 1 4,847,490 4,847,400 5,490,450 5,490,450
6,184,150 1 5,009,130 5,009,100 5,673,500 5,673,500
5,639,250 1 4,567,770 4,567,700 5,173,600 5,173,600
157,500 1 85,500 85,500 95,000 157,500 157,500
224,200 1 135,000 135,000 150,000 224,200 224,200
106,000 1 85,860 85,800 106,000 106,000
143,400 1 116,100 116,100 143,400 143,400
138,550 1 112,140 112,100 138,550 138,550
83,950 1 67,950 67,900 83,950 83,950
127,450 1 103,230 103,200 127,450 127,450
140,200 1 113,490 113,400 140,200 140,200
61,550 1 49,770 49,700 50,000 61,550 61,550
80,000 1 72,000 72,000 74,750 74,750
88,650 1 79,785 79,700 83,000 82,800 82,800
100,700 1 90,630 90,600 100,050 100,050

1,485,000 1 1,202,850 1,202,800 1,485,000 1,485,000


396,550 1 321,120 321,100 396,550 396,550
597,850 1 484,200 484,200 597,850 597,850
391,600 1 317,160 317,100 390,450 390,450
219,650 1 177,840 177,800 219,650 219,650
359,950 1 291,510 291,500 359,950 359,950
1,403,000
1,604,000
233,950 1 189,450 189,400 233,950 233,950
263,200 1 213,120 213,100 263,200 263,200
321,700 1 260,550 260,500 321,700 321,700
248,600 1 201,330 201,300 248,600 248,600
716,450 1 580,320 580,300 716,450 716,450
2,069,450 1 1,676,250 1,676,200 2,069,450 2,069,450
1,189,950 1 963,810 963,800 1,189,950 1,189,950

7,350 7,300 7,300


9,250 8,300 8,300
5,750 7,600 7,600

40,000 1 36,000 36,000 40,000 40,000

10,200 1 9,180 9,100 10,200 10,200

95
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )

15,750 1 14,175 14,100 25,000 15,750 15,750


33,650 1 14,220 14,200 15,800 33,650 33,650
39,300 1 19,440 19,400 21,600 39,300 39,300
44,900 1 22,500 22,500 25,000 44,900 44,900
401,500 1 247,500 247,500 275,000 401,500 401,500

24,500 1 22,050 22,000 24,100 22,450 22,450


827,250 1 670,050 670,000 125,000 827,250 827,250
27,500 1 22,230 22,200 25,200 25,200
31,150 1 25,200 25,200 31,150 31,150
33,600 1 19,350 19,300 21,500 22,000 22,000
54,850 1 31,500 31,500 35,000 682,500 682,500
18,900 1 15,300 15,300 18,900 18,900
20,800 1 16,830 16,800 20,800 20,800
29,500 1 13,500 13,500 15,000 29,500 29,500
37,000 1 29,970 29,900 37,000 37,000

118550 0.9 95940 95900 118550 118550

38,150 1 18,000 18,000 20,000 38,150 38,150


14,550 1 9,000 9,000 10,000 14,300 14,300
6,750 1 5,400 5,400 6,000 6,450 6,450
18,500 1 16,650 16,600 70,000 18,500 18,500
68,550 1 54,000 54,000 60,000 68,550 68,550
26,550 1 18,000 18,000 20,000 26,550 26,550

19,050 1 15,750 15,700 17,500 19,050 19,050


16,250 1 12,150 12,100 13,500 16,000 16,000
57,650 1 40,500 40,500 45,000 57,500 57,500
45,500 1 40,950 40,900 76,600 45,500 45,500
163,650 1 132,480 132,400 163,650 163,650
106,300 1 86,040 86,000 113,650 113,650

78,350 1 66,330 66,300 73,700 72,350 72,350


447,000 1 362,070 362,000 447,000 447,000
199,500 1 67,500 67,500 75,000 56,700 56,700
47,050 1 42,345 42,300 85,000 43,150 43,150
223,500 1 180,990 180,900 223,500 223,500
195,700 1 112,500 112,500 125,000 180,600 180,600

10,900 1 8,820 8,800 9,800 10,000 10,000


24,250 1 18,000 18,000 20,000 24,250 24,250
20,150 1 16,290 16,200 19,900 19,900
39,800 1 18,000 18,000 20,000 39,800 39,800

96,450 1 78,120 78,100 96,450 96,450


207,100 1 167,670 167,600 190,000 190,000
129,250 1 116,325 116,300 155,000 119,600 119,600
319,300 1 135,000 135,000 150,000 319,300 319,300
16,650 1 13,410 13,400 15,250 15,250
145,450 1 121,500 121,500 135,000 140,000 140,000

96
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )

29,650 1 26,685 26,600 10,250 10,250

10,950 1 8,100 8,100 9,000 10,950 10,950


4,500 1 3,600 3,600 4,000 4,500 4,500

9,300 1 7,650 7,600 8,500 9,300 9,300


13,000 1 11,700 11,700 16,000 13,000 13,000

21,050 1 18,900 18,900 21,050 21,050


23,000 1 20,700 20,700 26,450 26,450
56,500 1 50,850 50,800 82,700 82,700

9,200 1 8,190 8,100 9,188 9,188


16,013 1 14,400 14,400 16,013 16,013
25,830 1 23,220 23,200 25,830 25,830

115,000 1 103,500 103,500 143,750 143,750


151,800 1 136,620 136,600 151,800 151,800
166,700 1 150,075 150,000 172,500 172,500
207,000 1 186,300 186,300 212,700 212,700
248,500 1 223,650 223,600 254,100 254,100
295,500 1 265,950 265,900 295,500 295,500
187,400 1 168,660 168,600 187,400 187,400
207,000 1 186,300 186,300 212,700 212,700
254,100 1 228,690 228,600 254,100 254,100
295,500 1 265,950 265,900 295,500 295,500
341,500 1 307,350 307,300 341,500 341,500

6,650 1 5,310 5,300 6,143 6,143

36,800 1 31,500 31,500 35,000 36,800 36,800


86,250 1 77,625 77,600 86,250 86,250
120,750 1 108,675 108,600 140,000 120,750 120,750

41,400 1 33,120 33,100 36,600 41,400 41,400


43,700 1 38,250 38,200 41,000 43,700 43,700
50,600
40,700

344,950 1 310,455 310,400 344,950 344,950


287,450 1 258,705 258,700 287,450 287,450
247,500 1 222,750 222,700 155,250 155,250
665,500 1 598,950 598,900 792,436 792,436
431,200 1 388,080 388,000 470,925 470,925
597,850
391,160
522,500
412,500

97
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
291,500
192,500
170,500
82,500
291,500
225,500
159,500
104,500
82,500
38,500
345,115 1 279,540 279,500 345,115 345,115
217,465 1 176,130 176,100 217,465 217,465

25,300 1 14,220 14,200 17,500 25,300 25,300

15,700 1 14,130 14,100 17,500 14,850 14,850


11,500 1 10,350 10,300 12,000 11,500 11,500

3,750 1 3,375 3,300 12,500 3,750 3,750

234,950 1 190,260 190,200 364,140 364,140

10,100 1 9,090 9,000 9,818 9,818


2,850 1 2,565 2,500 2,573 2,573

632,550 1 512,280 512,200 325,000 632,550 632,550


275,650 1 223,200 223,200 275,650 275,650
135,150 1 109,440 109,400 90,500 129,400 129,400
103,800 1 84,060 84,000 90,900 99,400 99,400
48,900 1 39,600 39,600 44,000 46,800 46,800
73,300 1 59,310 59,300 64,200 70,200 70,200
69,200 1 55,980 55,900 55,500 66,300 66,300
90,100 1 72,900 72,900 72,100 86,300 86,300
31,900 1 25,830 25,800 25,400 30,600 30,600
47,800 1 38,700 38,700 41,800 45,800 45,800
1,644,550 1 1,332,000 1,332,000 1,531,800 1,531,800
2,466,850 1 1,998,090 1,998,000 229,770 229,770
2,349,950 1 1,903,410 1,903,400 2,211,900 2,211,900
3,524,900 1 2,855,160 2,855,100 3,288,100 3,288,100
2,108,950 1 1,708,200 1,708,200 3,076,800 3,076,800
4,959,300 1 4,016,970 4,016,900 4,621,800 4,621,800
4,132,650 1 3,347,370 3,347,300 3,855,900 3,855,900
5,890,300 1 4,771,080 4,771,000 5,403,900 5,403,900
257,650 1 208,620 208,600 225,900 244,300 244,300
133,800 1 108,360 108,300 96,800 128,100 128,100
200,650 1 162,450 162,400 192,200 192,200
171,750 1 139,050 139,000 125,300 164,500 164,500
245,000 1 198,450 198,400 184,100 234,600 234,600
367,450 1 297,630 297,600 322,100 350,000 350,000
32,250 1 26,100 26,100 30,000 37,200 37,200
58,200 1 47,070 47,000 51,000 55,800 55,800

98
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
357,050 1 289,170 289,100 268,000 341,900 341,900
535,550 1 433,710 433,700 469,500 501,900 501,900
561,900 1 455,130 455,100 493,700 515,500 515,500
844,650 1 684,090 684,000 740,600 788,400 788,400
744,250 1 602,820 602,800 601,200 699,900 699,900
1,116,350 1 904,230 904,200 978,800 1,043,300 1,043,300
1,157,550 1 937,530 937,500 1,014,900 1,082,900 1,082,900
1,736,300 1 1,406,340 1,406,300 1,522,400 1,624,300 1,624,300
33,700 1 30,330 30,300 29,800 32,300 32,300
50,550 1 40,860 40,800 44,300 47,000 47,000
28,150 1 22,770 22,700 26,500 25,900 25,900
42,250 1 34,200 34,200 37,000 39,300 39,300
22,300 1 18,000 18,000 22,600 20,500 20,500
33,450 1 27,090 27,000 29,200 31,100 31,100
67,800 1 54,900 54,900 52,400 65,000 65,000
101,700 1 82,350 82,300 89,100 94,300 94,300
53,550 1 43,290 43,200 41,800 51,300 51,300
80,300 1 64,980 64,900 70,300 74,700 74,700
78,750 1 63,720 63,700 61,800 75,400 75,400
118,100 1 95,580 95,500 103,500 109,700 109,700
15,150 1 12,240 12,200 15,400 14,000 14,000
22,700 1 18,360 18,300 19,900 21,100 21,100
101,450 1 82,170 82,100 79,300 97,100 97,100
152,150 1 123,210 123,200 133,300 140,000 140,000
8,350 1 6,750 6,700 7,000 7,700 7,700
12,500 1 10,080 10,000 10,900 11,600 11,600
141,950 1 114,930 114,900 94,600 131,600 131,600
73,300 1 59,310 59,300 54,800 68,000 68,000
64,650 1 52,290 52,200 56,700 60,000 60,000
43,100 1 34,830 34,800 35,600 41,300 41,300
48,900 1 39,600 39,600 38,900 46,800 46,800
1,181,500 1 956,970 956,900 1,035,900 1,094,800 1,094,800
1,772,250 1 1,435,500 1,435,500 1,553,900 1,643,600 1,643,600
1,610,350 1 1,304,370 1,304,300 1,411,900 1,493,400 1,493,400
2,415,500 1 1,956,510 1,956,500 2,117,900 2,239,600 2,239,600
2,108,950 1 1,708,200 1,708,200 1,849,200 1,956,000 1,956,000
3,163,450 1 2,562,390 2,562,300 2,773,800 2,932,900 2,932,900
2,729,850 1 2,211,120 2,211,100 2,393,600 2,531,500 2,531,500
4,094,800 1 3,316,770 3,316,700 3,590,400 3,796,500 3,796,500
63,900 1 51,750 51,700 52,000 61,200 61,200
95,800 1 77,580 77,500 84,000 88,900 88,900
94,650 1 76,590 76,500 74,400 46,800 46,800
4,715,550 1 3,819,510 3,819,500 4,134,800 4,373,100 4,373,100
7,073,350 1 5,729,400 5,729,400 6,202,200 6,559,800 6,559,800
137,250 1 111,150 111,100 103,000 131,400 131,400
205,850 1 166,680 166,600 180,400 190,900 190,900
192,950 1 156,240 156,200 146,500 184,800 184,800
289,400 1 234,360 234,300 253,700 268,400 268,400
315,150 1 255,240 255,200 253,100 301,700 301,700
472,700 1 382,860 382,800 414,400 438,500 438,500
382,800 1 310,050 310,000 307,800 366,600 366,600
574,200 1 465,030 465,000 503,400 532,500 532,500
677,000 1 548,370 548,300 593,600 627,300 627,300
1,015,500 1 822,510 822,500 890,400 941,600 941,600

99
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
52,657 1 42,570 42,500 41,000 60,555 60,555
92,290 1 74,700 74,700 100,000 92,290 92,290
1,973,400 1 1,598,400 1,598,400 2,300,000 1,810,435 1,810,435
170,940 1 138,420 138,400 140,000 170,940 170,940
188,750 1 152,820 152,800 200,000 184,910 184,910
354,365 1 287,010 287,000 280,000 354,365 354,365
45,185 1 36,540 36,500 40,000 45,185 45,185
554,455 1 449,100 449,100 420,000 554,455 554,455
1,155,275 1 935,730 935,700 880,000 1,155,275 1,155,275
1,376,250 1 1,114,740 1,114,700 1,450,000 1,279,355 1,279,355
359,205 1 290,880 290,800 430,000 359,205 359,205

674,000 1 606,600 606,600 700,000 674,000 674,000


793,500 1 714,150 714,100 1,000,000 793,500 793,500
1,051,350 1 946,215 946,200 1,600,000 1,051,350 1,051,350
1,482,100 1 1,333,890 1,333,800 1,900,000 1,482,100 1,482,100
1,798,050 1 1,618,245 1,618,200 160,000 1,798,050 1,798,050
150,550 1 135,495 135,400 225,000 150,550 150,550
191,550 1 172,395 172,300 400,000 191,550 191,550
249,650 1 224,685 224,600 450,000 249,650 249,650
319,000 1 287,100 287,100 500,000 319,000 319,000
396,200 1 356,580 356,500 600,000 396,200 396,200
532,000 1 478,800 478,800 850,000 532,000 532,000
733,750 1 660,375 660,300 1,000,000 733,750 733,750
861,700 1 775,530 775,500 1,350,000 861,700 861,700
1,223,700 1 1,101,330 1,101,300 2,000,000 1,223,700 1,223,700
1,752,750 1 1,577,475 1,577,400 2,350,000 1,752,750 1,752,750
2,088,450 1 1,879,605 1,879,600 3,500,000 2,088,450 2,088,450
3,509,250 1 3,158,325 3,158,300 110,000 3,509,250 3,509,250
153,050 1 137,745 137,700 185,000 153,050 153,050
189,000 1 170,100 170,100 250,000 189,000 189,000
289,950 1 260,955 260,900 280,000 289,950 289,950
374,250 1 336,825 336,800 350,000 374,250 374,250
444,000 1 399,600 399,600 400,000 444,000 444,000
658,450 1 592,605 592,600 500,000 658,450 658,450
840,850 1 756,765 756,700 600,000 840,850 840,850
1,041,500 1 937,350 937,300 850,000 1,041,500 1,041,500
1,507,100 1 1,356,390 1,356,300 1,000,000 1,507,100 1,507,100
1,950,300 1 1,755,270 1,755,200 1,300,000 1,950,300 1,950,300
2,356,700 1 2,121,030 2,121,000 2,356,700 2,356,700
186,000 1 167,400 167,400 186,000 186,000
238,950 1 215,055 215,000 238,950 238,950
366,400 1 329,760 329,700 366,400 366,400
483,600 1 435,240 435,200 483,600 483,600
555,600 1 500,040 500,000 555,600 555,600
758,100 1 682,290 682,200 758,100 758,100
966,950 1 870,255 870,200 966,950 966,950
1,249,150 1 1,124,235 1,124,200 1,249,150 1,249,150
1,808,450 1 1,627,605 1,627,600 1,808,450 1,808,450
2,433,850 1 2,190,465 2,190,400 2,433,850 2,433,850
2,897,400 1 2,607,660 2,607,600 2,897,400 2,897,400
4,161,850 1 3,745,665 3,745,600 4,161,850 4,161,850

305,450 1 274,905 274,900 305,450 305,450

100
2018 ZONA
Rata2 HARGA
1 Basic Price
Basic Price
Pembulatan Hrg Survei
PERENCANAAN HPS 2017
2017 ( Zona 1 )
357,200 1 321,480 321,400 357,200 357,200
426,050 1 383,445 383,400 426,050 426,050
651,600 1 586,440 586,400 651,600 651,600

766,900 1 621,180 621,100 766,900 766,900

3,150 1 2,835 2,800 4,000 2,900 2,900

40,250 1 36,225 36,200 40,250 40,250


51,900 1 46,710 46,700 51,900 51,900
23,250 1 20,925 20,900 23,250 23,250
500
5,500
550
2,500
2,650 1 2,385 2,300 2,400 2,400
17,150 1 15,435 15,400 15,700 15,700
2,000
78,350 1 70,515 70,500 4,600 4,600
5,950
25,000 1 22,500 22,500 33,750 33,750
50,000 1 45,000 45,000 175,000 175,000
5,500 1 4,950 4,900 5,000 5,000
50,000 1 45,000 45,000 7200 7200

101
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
5 6 7 8

13,800 13,800 14,400 13,550 2


13,800 13,800 14,400 13,550 2
2,300 2,300 2,400 2,250 2
19,700 19,700 20,500 19,700 -
15,600 15,600 16,300 15,600 -
16,800 16,800 16,800 15,600 3
2,100 2,100 2,200 2,100 -
17,000 17,000 17,700 17,000 -
341,250 341,250 341,250 (100)

69,000 69,000 71,800 65,950 (29)


82,500 83,950 87,350 81,200 (29)
67,850 67,850 70,600 62,550 (32)
80,500 80,500 83,750 77,300 (27)
13,800 13,800 14,400 13,450 8

36,800 36,800 36,800 35,100 5


17,850 17,850 17,850 16,700 7
161,000 161,000 161,000 159,100 1
229,950 229,950 229,950 227,300 1
312,850 312,850 312,850 309,300 1
96,600 96,600 96,600 92,000 1
120,000 120,000 120,000 110,000 12
98,150 98,150 98,150 98,150 (1)
120,750 120,750 120,750 114,050 9

138,000 138,000 138,000 129,600 17


1,322,150 1,322,150 1,322,150 1,281,150 (7)
2,414,350 2,414,350 2,414,350 2,379,200 (9)
709,400 709,400 709,400 701,200 (7)

1,550,000 1,550,000 1,550,000 1,455,750 (43)

275,000 275,000 302,000 193,200 56


270,000 270,000 302,000 181,850 66
217,300 217,300 226,000 198,900 (12)
70,000 70,000 106,400 102,300 (27)
126,500 126,500 131,600 115,950 16
80,000 80,000 80,000 184,000 (51)

102
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )

87,000 87,000 90,500 87,000 (6)


750 750 780 750 (7)
6,350 6,350 6,650 5,400 11
143,750 143,750 149,500 135,000 6
115,000 115,000 119,600 115,000 (10)
112,700 112,700 117,250 103,200 12
109,250 109,250 113,650 106,400 (8)
101,200 101,200 105,250 99,000 (3)
24,300 24,300 25,300 24,300 (10)
10,050 10,050 10,500 9,400 5
7,150 7,150 7,450 6,700 19
151,800 151,800 157,900 140,000 (2)
148,350 148,350 154,300 136,000 4
287,450 287,450 298,950 268,450 (4)
258,700 258,700 269,050 244,050 8
252,950 252,950 263,100 240,400 5
129,950 129,950 135,150 120,000 17
229,950 229,950 239,150 213,550 11
178,250 178,250 185,400 164,750 10

55,200 55,200 55,200 50,650 (50)


44,300 44,300 44,300 40,950 (3)
134,500 134,500 134,500 134,500 (10)
231,850 231,850 231,850 231,850 (10)
53,150 53,150 53,150 53,150 (5)
39,050 39,050 39,050 39,050 (10)
24,450 24,450 24,450 24,450 4
3,700 3,700 3,700 3,700 (11)
27,500 27,500 27,500 27,500 52
26,300 26,300 26,300 26,300 59
66,700 66,700 66,700 65,950 (9)
187,050 187,050 187,050 187,050 (1)
61,550 61,550 61,550 56,500 9
59,800 59,800 59,800 54,950 10
27,500 27,500 27,500 27,500 3
27,600 27,600 27,600 25,500 10
10,700 10,700 10,700 9,800 19
58,950 58,950 58,950 58,300 1
28,750 28,750 28,750 26,300 3
36,050 36,050 36,050 36,050 (0)
36,650 36,650 36,650 36,650 11
5,200 5,200 5,200 5,150 (11)
51,250 51,250 51,250 51,250 4
12,650 12,650 12,650 11,650 24
106,800 106,800 106,800 106,800 4
102,350 102,350 102,350 93,950 6
90,950 90,950 90,950 90,950 (39)
78,050 78,050 78,050 78,050 (27)
31,050 31,050 31,050 29,350 (3)
10,700 10,700 10,700 9,800 22
36,800 36,800 36,800 36,650 8
128,000 128,000 128,000 128,000 (30)
142,600 142,600 142,600 142,600 (33)

103
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
57,550 57,550 57,550 57,550 (29)

187,050 187,050 187,050 187,050 (1)

104
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )

46,600 46,600 46,600 42,750 18


173,050 173,050 173,050 158,650 21
850,800 850,800 850,800 774,800 11

89,700 89,700 89,700 82,400 9


58,650 58,650 58,650 53,700 (1)
86,250 86,250 86,250 78,750 (31)
120,750 120,750 120,750 111,700 (31)
78,200 78,200 78,200 73,250 (37)
155,250 155,250 155,250 145,200 (4)
115,000 115,000 115,000 106,650 (3)
126,500 126,500 126,500 117,750 (3)
27,600 27,600 27,600 25,500 4
19,300 19,300 19,300 19,300 (10)
23,250 23,250 23,250 23,250 (10)
46,200 46,200 46,200 46,200 (8)
73,100 73,100 73,100 73,100 (10)
9,750 9,750 9,750 9,750 (11)
34,150 34,150 34,150 34,150 (41)
46,450 46,450 46,450 46,450 (10)
48,250 48,250 48,250 48,250 (38)
51,700 51,700 51,700 51,700 (10)

57,350 57,350 57,350 57,350 (39)


62,250 62,250 62,250 62,250 (28)
69,550 69,550 69,550 69,550 (28)
76,900 76,900 76,900 76,900 (5)
84,200 84,200 84,200 84,200 (9)

14,500 14,500 17,700 17,000 (24)


100,050 100,050 104,100 100,050 10
231,800 231,800 241,100 231,800 5
140,650 140,650 146,300 140,650 3
197,750 197,750 205,700 197,750 2
272,450 272,450 283,350 272,450 -
14,000 14,000 15,100 14,500 (12)
14,000 14,000 14,900 14,300 (11)
29,100 29,100 30,300 29,100 -
212,950 212,950 221,500 212,950 -
33,750 33,750 35,100 33,750 134
20,250 20,250 21,100 20,250 63

13,500 13,500 15,300 14,650 (13)

13,000 13,000 14,800 14,200 (26)


13,200 13,200 15,100 14,500 (24)
169,900 169,900 176,700 169,900 (89)
95,950 95,950 99,788 95,950 (72)
84,500 84,500 87,880 84,500 (76)

105
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )

106
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )

358,750 358,750 358,750 354,600 13

6,600 6,600 6,600 6,500 (8)


8,650 8,650 8,650 8,000 11
6,150 6,150 6,150 6,150 10
14,750 14,750 14,750 13,450 10

8,800 8,800 8,800 8,800 -


11,000 11,000 11,000 11,000 -
4,500 4,500 4,500 4,100 12

10,400 10,400 10,400 10,400 (4)


2,300 2,300 2,300 2,300 (9)
1,350 1,350 1,350 1,250 8
10,550 10,550 10,550 10,550 (11)
58,700 58,700 58,700 58,700 (10)
13,800 13,800 13,800 13,650 1
35,300 35,300 35,300 34,950 1

88,800 88,800 88,800 88,800


105,750 105,750 105,750 105,750
117,750 117,750 117,750 117,750

53,400 53,400 53,400 53,400


66,150 66,150 66,150 63,450
84,550 84,550 84,550 77,300
103,500 103,500 103,500 85,450
69,000 69,000 69,000 67,150
123,600 123,600 123,600 109,850
79,350 79,350 79,350 79,350
161,000 161,000 161,000 146,450
110,000 110,000 110,000 91,550
128,150 128,150 128,150
20,150 20,150 20,150
26,600 26,600 26,600
33,900 33,900 33,900
40,250 40,250 40,250
46,600 46,600 46,600

584,700 584,700 584,700 584,700


73,900 73,900 73,900 73,900
25,900 25,900 25,900 24,000
4,450 4,450 4,450 4,450
67,850 67,850 67,850 62,450
54,050 54,050 54,050 50,150
103,700 103,700 103,700 103,700
92,800 92,800 92,800 92,800
58,400 58,400 58,400 58,400
862,300 862,300

57,500 57,500

107
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )

5,200 5,200 5,200 4,900


4,600 4,600 4,600 4,550

81,650 81,650 81,650 81,650


155,250 155,250 155,250 143,300
131,100 131,100 131,100 128,150
68,650 68,650 68,650 68,650
84,550 84,550 84,550 84,550
63,850 63,850 63,850 61,050
74,750 74,750 74,750 68,350
83,750 83,750 83,750 79,350
86,650 86,650 86,650 86,650
102,350 102,350 102,350 97,650
94,600 94,600 94,600 94,600
20,150 20,150 20,150 18,350
109,250 109,250 109,250 108,050
57,500 57,500 57,500 56,150
74,750 74,750 74,750 68,200
25,650 25,650 25,650 25,400
60,400 60,400 60,400 59,700
38,550 38,550 38,550 36,650

67,150 67,150 67,150 67,150


33600 33600 33600 33600

1,494,600 1,494,600 1,494,600 1,430,000


143,400 143,400 143,400 143,400
109,850 109,850 109,850 109,850
2,440,200 2,440,200 2,440,200 2,440,200

103,450 103,450 103,450 103,450

195,450 195,450 195,450 193,200


274,550 274,550 274,550 274,550
372,050 372,050 372,050 372,050
1,034,750 1,034,750 1,034,750 1,022,800

700,900 700,900 700,900 700,900


357,300 357,300 357,300 357,300
595,650 595,650 595,650 595,650
185,000 185,000 185,000 170,850

21,850 21,850 21,850 21,600


30,550 30,550 30,550 30,550
385,750 385,750 385,750 381,300
456,400 456,400 456,400 451,150

11,000 11,000 11,000 11,000

518,150 518,150 518,150 518,150


582,900 582,900 582,900 582,900

108
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
394,150 394,150 394,150 394,150
1,000 1,000 1,000 1,000
51,750 51,750 51,750 53,050
54,050 54,050 57,950 53,300
57,500 57,500 55,300 56,450
63,250 63,250 56,900 61,450
32,450 32,450 32,450 32,450
51,250 51,250 51,250 51,250
48,250 48,250 48,250 48,250
54,350 54,350 54,350 54,350
21,850 21,850 21,850 20,000
62,500 62,500 62,500 62,500
83,950 83,950 83,950 83,000

6,750 6,750 6,750 6,750


11,650 11,650 11,650 11,650
16,550 16,550 16,550 16,550
17,250 17,250 17,250 17,100
19,550 19,550 19,550 19,550

14,650 14,650 14,650 13,400


8,550 8,550 8,550 8,550
37,950 37,950 37,950

573,950 573,950 573,950 573,950


323,900 323,900 323,900 323,900
466,350 466,350 466,350 466,350
242,350 242,350 242,350 242,350
250,100 250,100 250,100 250,100
242,350 242,350 242,350 242,350

24,450 24,450 24,450 24,450


24,450 24,450 24,450 24,450
14,500 14,500 14,500 14,500

1,300 1,300 1,300 1,300

589,400 589,400 589,400 589,400


330,700 330,700 330,700 330,700

109
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
466,350 466,350 466,350 466,350
272,100 272,100 272,100 272,100
304,700 304,700 304,700 301,150

201,200 201,200 201,200 198,900

350 350 350 350

110
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )

109,350 109,350 109,350 100,100

88,650 88,650 88,650 88,650


71,850 71,850 71,850 68,650
18,350 18,350 18,350 18,350

62,250 62,250 62,250 62,250


94,600 94,600 94,600 94,600
131,200 131,200 131,200 131,200
42,550 42,550 42,550 39,700
63,250 63,250 63,250 59,250

13,750 13,750 13,750 13,750


15,000 15,000 15,000 15,000
17,800 17,800 17,800 17,800
18,700 18,700 18,700 18,700
27,050 27,050 27,050 27,050
30,150 30,150 30,150 30,150

14,950 14,950 14,950 48,850


28,750 28,750 29,900 30,550

105,000 110,000 119,200 106,000


125,000 130,000 138,350 123,000
130,000 135,000 151,750 135,000
155,000 160,000 174,300 155,000
20,700 20,700 21,550 20,750
115,000 115,000 115,000 29,300
66,150 66,150 68,800 53,650
80,500 80,500 83,750 58,100

19,550 19,550 19,550 19,550

19,750 19,750 20,600 19,750


3,564,050 3,564,050 3,706,650 3,300,000
175,950 175,950 183,000 160,950
18,009,150 18,009,150 18,729,550 18,009,150
18,009,150 18,009,150 18,729,550 18,009,150
7,873,350 7,873,350 8,188,300 7,873,350
13,031,500 13,031,500 13,552,800 13,031,500
13,446,700 13,446,700 13,984,600 13,446,700

111
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
18,009,150 18,009,150 18,729,550 18,009,150
12,071,750 12,071,750 12,554,650 11,000,000
12,646,600 12,646,600 13,152,500 12,500,600
10,922,050 10,922,050 11,358,950 10,795,950
7,930,650 7,930,650 8,247,900 7,930,650
9,772,350 9,772,350 10,163,250 8,925,000
8,622,700 8,622,700 8,967,650 8,000,000
7,930,650 7,930,650 6,344,550 7,930,650
6,100,500 6,100,500 6,344,550 6,100,500
8,540,700 8,540,700 8,882,350 8,540,700
6,100,500 6,100,500 6,344,550 6,100,500
5,490,450 5,490,450 5,710,100 5,490,450
5,490,450 5,490,450 5,710,100 5,490,450
5,673,500 5,673,500 5,900,450 5,673,500
5,173,600 5,173,600 5,380,550 4,725,000
150,000 157,500 163,800 157,500
200,000 224,200 233,200 224,200
106,000 106,000 110,300 106,000
143,400 143,400 149,200 143,400
138,550 138,550 144,100 138,550
83,950 83,950 87,350 77,200
127,450 127,450 132,600 127,450
140,200 140,200 145,900 140,200
61,550 61,550 64,050 58,000
74,750 74,750 77,750 69,550
82,800 82,800 86,150 81,850
100,050 100,050 104,100 100,050

1,427,550 1,427,550 1,427,550 1,427,550


396,550 396,550 396,550 396,550
597,850 597,850 597,850 597,850
390,450 390,450 390,450 390,450
219,650 219,650 219,650 219,650
359,950 359,950 359,950 359,950

220,750 220,750 220,750 218,200


248,350 248,350 248,350 245,500
303,550 303,550 303,550 300,050
234,550 234,550 234,550 231,850
662,250 662,250 662,250 654,600
2,069,450 2,069,450 2,069,450 2,045,550
1,189,950 1,189,950 1,189,950 1,176,200

8,600 8,600 8,600 6,500


10,900 10,900 10,900 10,900
8,350 8,350 8,350 5,500

40,000 40,000 40,000 40,000

10,200 10,200 10,200 10,200

112
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )

15,750 15,750 15,750 15,750


18,250 18,250 18,250 18,250
24,350 24,350 24,350 24,350
30,450 30,450 30,450 30,450
401,500 401,500 401,500 401,500

19,200 19,200 19,200 19,200


827,250 827,250 827,250 827,250
25,200 25,200 25,200 25,200
31,150 31,150 31,150 31,150
19,500 19,500 19,500 19,500
682,500 682,500 682,500 682,500
18,900 18,900 18,900 18,900
20,800 20,800 20,800 20,800
29,500 29,500 29,500 29,500
37,000 37,000 37,000 37,000

118,550 118,550 118,550 118,550

34,300 34,300 34,300 33,900


14,300 14,300 14,300 14,300
6,450 6,450 6,450 6,450
16,400 16,400 16,400 16,150
68,550 68,550 68,550 68,550
26,550 26,550 26,550 26,550

19,050 19,050 19,050 19,050


12,150 12,150 12,150 12,000
57,500 57,500 57,500 57,500
45,500 45,500 45,500 45,500
163,650 163,650 163,650 163,650
113,650 113,650 113,650 113,650

72,350 72,350 72,350 72,350


447,000 447,000 447,000 447,000
56,700 56,700 56,700 56,700
43,150 43,150 43,150 43,150
223,500 223,500 223,500 223,500
180,600 180,600 180,600 180,600

8,600 8,600 8,600 8,600


24,250 24,250 24,250 24,250
19,900 19,900 19,900 19,900
39,800 39,800 39,800 39,800

96,450 96,450 96,450 96,450


160,650 160,650 160,650 160,650
119,600 119,600 119,600 119,600
319,300 319,300 319,300 319,300
15,250 15,250 15,250 15,250
113,650 113,650 113,650 113,650

113
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )

10,250 10,250 10,250 10,250

10,950 10,950 10,950 10,850


4,500 4,500 4,500 4,500

9,300 9,300 9,300 9,300


13,000 13,000 13,000 13,000

21,050 21,050 21,050 21,050


26,150 26,150 26,150 26,150
82,700 82,700

9,188 9,188 9,188 9,188


16,013 16,013 16,013 16,013
25,830 25,830 25,830 25,830

143,750 143,750 143,750 142,100


151,800 151,800 151,800 150,050
172,500 172,500 172,500 170,500
212,700 212,700 212,700 210,250
254,100 254,100 254,100 251,150
295,500 295,500 295,500 292,100
187,400 187,400 187,400 185,250
212,700 212,700 212,700 210,250
254,100 254,100 254,100 251,150
295,500 295,500 295,500 292,100
341,500 341,500 341,500 337,550

6,143 6,143 6,143 6,143

36,800 36,800 36,800 35,000


86,250 86,250 86,250 85,250
120,750 120,750 120,750 119,350

41,400 41,400 41,400 40,950


43,700 43,700 43,700 43,200

344,950 344,950 344,950 340,950


287,450 287,450 287,450 284,150
155,250 155,250 155,250 153,450
792,436 792,436
470,925 470,925

114
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )

345,115 345,115
217,465 217,465

25,300 25,300 25,300 25,050

14,850 14,850 14,850 14,850


11,500 11,500 11,500 14,300

3,750 3,750 3,750 3,750

364,140 364,140 364,140 364,140

9,818 9,818 9,818 9,818


2,573 2,573 2,573 2,573

632,550 632,550 632,550 632,550


275,650 275,650 275,650 275,650
117,650 117,650 117,650 117,650
90,450 90,450 90,450 90,450
44,200 44,200 44,200 43,700
63,950 63,950 63,950 63,950
62,500 62,500 62,500 61,750
81,300 81,300 81,300 80,400
28,750 28,750 28,750 28,450
42,250 42,250 42,250 42,250
1,398,900 1,398,900 1,398,900 1,398,900
2,098,350 2,098,350 2,098,350 2,098,350
2,019,950 2,019,950 2,019,950 2,019,950
3,002,800 3,002,800 3,002,800 3,002,800
2,809,850 2,809,850 2,809,850 2,809,850
4,220,750 4,220,750 4,220,750 4,220,750
3,521,350 3,521,350 3,521,350 3,521,350
4,935,050 4,935,050 4,935,050 4,935,050
223,100 223,100 223,100 223,100
120,750 120,750 120,750 119,350
174,900 174,900 174,900 174,900
155,000 155,000 155,000 153,200
221,150 221,150 221,150 218,600
319,600 319,600 319,600 319,600
35,100 35,100 35,100 34,700
51,300 51,300 51,300 51,300

115
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
322,300 322,300 322,300 318,600
458,300 458,300 458,300 458,300
470,750 470,750 470,750 470,750
719,950 719,950 719,950 719,950
639,150 639,150 639,150 639,150
952,700 952,700 952,700 952,700
988,900 988,900 988,900 988,900
1,483,300 1,483,300 1,483,300 1,483,300
30,500 30,500 30,500 30,150
42,850 42,850 42,850 42,850
23,650 23,650 23,650 23,650
35,850 35,850 35,850 35,850
18,700 18,700 18,700 18,700
28,400 28,400 28,400 28,400
61,350 61,350 61,350 56,700
86,050 86,050 86,050 42,850
48,300 48,300 48,300 47,750
68,200 68,200 68,200 68,200
71,100 71,100 71,100 70,250
100,100 100,100 100,100 100,100
12,700 12,700 12,700 12,700
19,200 19,200 19,200 19,200
91,550 91,550 91,550 90,500
127,850 127,850 127,850 127,850
6,950 6,950 6,950 6,950
10,550 10,550 10,550 10,550
120,150 120,150 120,150 120,150
62,100 62,100 62,100 62,100
54,750 54,750 54,750 54,750
38,900 38,900 38,900 37,500
44,200 44,200 44,200 43,700
999,750 999,750 999,750 999,750
1,500,950 1,500,950 1,500,950 1,500,950
1,363,800 1,363,800 1,363,800 1,363,800
2,045,250 2,045,250 2,045,250 2,045,250
1,786,300 1,786,300 1,786,300 1,786,300
2,678,400 2,678,400 2,678,400 2,678,400
2,311,800 2,311,800 2,311,800 2,311,800
3,467,050 3,467,050 3,467,050 3,467,050
57,800 57,800 57,800 57,100
81,100 81,100 81,100 81,100
83,150 83,150 83,150 82,150
3,993,650 3,993,650 3,993,650 3,993,650
5,990,600 5,990,600 5,990,600 5,990,600
123,850 123,850 123,850 120,000
174,300 174,300 174,300 174,300
174,250 174,250 174,250 168,000
245,100 245,100 245,100 245,100
284,600 284,600 284,600 281,300
400,450 400,450 400,450 400,450
345,550 345,550 345,550 341,550
486,300 486,300 486,300 486,300
572,850 572,850 572,850 572,850
859,850 859,850 859,850 859,850

116
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
60,555 60,555 60,555 60,555
92,290 92,290 92,290 92,290
1,810,435 1,810,435 1,810,435 1,810,435
170,940 170,940 170,940 170,940
184,910 184,910 184,910 184,910
354,365 354,365 354,365 354,365
45,815 45,815 45,815 45,815
554,455 554,455 554,455 554,455
1,155,275 1,155,275 1,155,275 1,155,275
1,279,355 1,279,355 1,279,355 1,279,355
359,205 359,205 359,205 359,205

674,000 674,000 674,000 674,000


793,500 793,500 793,500 793,500
1,051,350 1,051,350 1,051,350 1,051,350
1,482,100 1,482,100 1,482,100 1,482,100
1,798,050 1,798,050 1,798,050 1,798,050
150,550 150,550 150,550 150,550
191,550 191,550 191,550 191,550
249,650 249,650 249,650 249,650
319,000 319,000 319,000 319,000
396,200 396,200 396,200 396,200
532,000 532,000 532,000 532,000
733,750 733,750 733,750 733,750
861,700 861,700 861,700 861,700
1,223,700 1,223,700 1,223,700 1,223,700
1,752,750 1,752,750 1,752,750 1,752,750
2,088,450 2,088,450 2,088,450 2,088,450
3,509,250 3,509,250 3,509,250 3,509,250
153,050 153,050 153,050 153,050
189,000 189,000 189,000 189,000
289,950 289,950 289,950 289,950
374,250 374,250 374,250 374,250
444,000 444,000 444,000 444,000
658,450 658,450 658,450 658,450
840,850 840,850 840,850 840,850
1,041,500 1,041,500 1,041,500 1,041,500
1,507,100 1,507,100 1,507,100 1,507,100
1,950,300 1,950,300 1,950,300 1,950,300
2,356,700 2,356,700 2,356,700 2,356,700
186,000 186,000 186,000 186,000
238,950 238,950 238,950 238,950
366,400 366,400 366,400 366,400
483,600 483,600 483,600 483,600
555,600 555,600 555,600 555,600
758,100 758,100 758,100 758,100
966,950 966,950 966,950 966,950
1,249,150 1,249,150 1,249,150 1,249,150
1,808,450 1,808,450 1,808,450 1,808,450
2,433,850 2,433,850 2,433,850 2,433,850
2,897,400 2,897,400 2,897,400 2,897,400
4,161,850 4,161,850 4,161,850 4,161,850

305,450 305,450 305,450 305,450

117
HARGA HARGA PERSENTASE
HARGA SATUAN
HPS 2016 PERENCANAAN PERENCANAAN
KABUPATEN 2015 (%)
2016 2016 ( Zona 2 )
357,200 357,200 357,200 357,200
426,050 426,050 426,050 426,050
651,600 651,600 651,600 651,600

766,900 766,900 766,900 766,900

2,900 2,900 2,900 2,900

40,250 40,250 40,250 36,750


51,900 51,900 51,900 51,900
23,250 23,250 23,250 23,250

2,400 2,400 2,400 2,400


15,700 15,700 15,700 15,700

4,600 4,600 4,600 4,600

33,750 33,750 33,750


175,000 175,000
3,000 3,000
7200 7200

118
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
7 5

13,150 13,550
12,750 13,550
2,150 2,250
18,000 19,700
14,250 15,600
14,800 15,600
2,000 2,100
16,600 17,000
325,000 341,250

62,000 65,950
77,000 81,200
61,000 62,550
75,000 77,300
12,250 13,450

35,100 35,100
15,300 16,700
373,750 159,100
715,875 227,300
272,100 309,300
84,000 92,000
92,000 105,000
98,150 98,150
110,000 114,000

129,600 129,600
1,281,150 1,281,150
2,379,200 2,379,200
617,550 701,200

1,281,675 1,455,750

183,050 193,200
176,950 181,850
189,150 198,900
60,000 60,000
115,950 115,950
75,000

119
HARGA HARGA
SATUAN PERENCANAAN
2014 2015

87,000 87,000
750 750
5,400 5,400
125,300 135,000
115,000 115,000
103,200 103,200
106,400 106,400
99,000 99,000
24,300 24,300
9,400 9,400
6,700 6,700
140,000 140,000
136,000 136,000
268,450 268,450
244,050 244,050
240,400 240,400
120,000 120,000
213,550 213,550
164,750 164,750

50,650 50,650
40,950 40,950
134,500 134,500
88,500 136,800
51,250 53,150
39,050 39,050
24,450 24,450
3,700 3,700
27,500 27,500
26,300 26,300
65,950
187,050 187,050
56,500 56,500
54,950 54,950
27,500 27,500
25,500 25,500
9,800 9,800
51,250 58,300
26,300 26,300
36,050 36,050
36,650 36,650
4,500 5,150
51,250 51,250
11,650 11,650
16,650 106,800
93,950 93,950
90,950 90,950
78,050 78,050
26,850 29,350
9,800 9,800
36,650 36,650
128,000 126,000
142,600 142,600

120
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
57,550 57,550

187,050 187,050

121
HARGA HARGA
SATUAN PERENCANAAN
2014 2015

42,750 42,750
158,650 158,650
774,800 774,800

82,400 82,400
53,700 53,700
78,750 78,750
111,700 111,700
73,250 73,250
145,200 145,200
106,650 106,650
117,750 117,750
25,500 25,500
19,300 19,300
23,250 23,250
46,200 46,200
73,100 73,100
9,750 9,750
34,150 34,150
46,450 46,450
48,250 48,250
51,700 51,700

57,350 57,350
62,250 62,250
69,550 69,550
76,900 76,900
84,200 84,200

14,500 14,500
100,050 100,050
231,800 231,800
140,650 140,650
197,750 197,750
272,450 272,450
14,000 14,000
14,000 14,000
29,100 29,100
212,950 212,950
33,750 33,750
20,250 20,250

13,500 13,500

12,500 13,000
13,000 13,200
176,700 169,900
95,950 95,950
84,500 84,500

122
HARGA HARGA
SATUAN PERENCANAAN
2014 2015

354,600

6,050 6,500
8,000 8,000
6,150 6,150
13,300 13,450

8,800 8,800
11,000 11,000
4,050 4,100

10,400 10,400
2,100 2,200
2,000 1,250
10,550 10,550
58,700 58,700
12,190 13,500
39,675 30,000

88,800 88,800
105,750 105,750
117,750 117,750

53,400 53,400
63,450 63,450
73,250 77,300
85,450 85,450
67,150 67,150
109,850 109,850
79,350 79,350
146,450 146,450
91,550 91,550
128,150
18,350
26,600
33,900
36,650
42,750

584,700 584,700
73,900 73,900
24,000 24,000
4,450 4,450
62,450 62,450
50,150 50,150
103,700 103,700
92,800 92,800
58,400 58,400

123
HARGA HARGA
SATUAN PERENCANAAN
2014 2015

4,900 4,900
4,300 4,550

81,650 81,650
143,300
128,150 128,150
68,650 68,650
84,550 84,550
61,050 61,050
68,350 68,350
72,500 78,000
86,650 86,000
92,500 95,000
94,600
18,350 18,350
108,050 108,050
56,150 56,150
68,200
22,300 25,400
52,400 55,000
36,000 36,500

67,150 67,150
33600 33600

1,300,000 1,430,000
143,400 143,400
109,850 109,850
2,440,200 2,440,200

103,450 103,450

193,200
274,550 274,550
372,050 372,050
1,022,800

700,900 700,900
357,300 357,300
595,650 595,650
170,850

21,600
30,550 30,550
381,300
451,150

11,000 11,000

518,150 518,150
582,900 582,900

124
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
394,150 394,150
1,000 1,000
53,050 53,050
53,300 53,300
56,450 56,450
61,450 61,450
32,450 32,450
50,450 51,250
45,650 48,250
53,500 54,350
20,000 20,000
62,500 62,500
83,000

6,750 6,750
11,650 11,650
16,550 16,550
17,100 17,100
19,550 19,550

12,250 13,400
8,550 8,550

573,950 573,950
323,900 323,900
466,350 466,350
242,350 242,350
250,100 250,100
242,350 242,350

24,450 24,450
24,450 24,450
14,500 14,500

1,300 1,300

589,400 589,400
330,700 330,700

125
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
466,350 466,350
272,100 272,100
301,150

198,900

350 350

126
HARGA HARGA
SATUAN PERENCANAAN
2014 2015

100,100 100,100

88,650 88,650
71,850 68,650
18,350 18,350

62,250 62,250
94,600 94,600
131,200 131,200
39,700 39,700
59,250 59,250

13,750 13,750
15,000 15,000
17,800 17,800
18,700 18,700
27,050 27,050
30,150 30,150

48,850 48,850
30,550 30,550

97,500 106,000
120,000 123,000
115,000 135,000
130,000 155,000
20,750 20,750
29,300 29,300
53,650
58,100

18,000 19,550

19,750 19,750
3,000,000 3,000,000
160,950 160,950
### 18,009,150
### 18,009,150
7,873,350 7,873,350
### 13,031,500
### 13,446,700

127
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
### 18,009,150
### 11,000,000
### 12,500,600
9,975,000 10,795,950
7,930,650 7,930,650
8,925,000 8,925,000
7,350,000 8,000,000
7,930,650 7,930,650
6,100,500 6,100,500
8,540,700 8,540,700
6,100,500 6,100,500
5,490,450 5,490,450
5,490,450 5,490,450
5,673,500 5,673,500
4,725,000 4,725,000
150,000 150,000
195,000 195,000
106,000 106,000
143,400 143,400
138,550 138,550
77,200 77,200
127,450 127,450
140,200 140,200
58,000 58,000
69,550 69,550
79,350 81,850
100,050 100,050

1,427,550 1,427,550
396,550 396,550
597,850 597,850
390,450 390,450
219,650 219,650
359,950 359,950

218,200
245,500
300,050
231,850
654,600
2,045,550
1,176,200

6,500 6,500
10,000 10,900
5,500 5,500

40,000 40,000

10,200 10,200

128
HARGA HARGA
SATUAN PERENCANAAN
2014 2015

15,750 15,750
18,250 18,250
24,350 24,350
30,450 30,450
401,500 401,500

19,200 19,200
827,250 827,250
25,200 25,200
31,150 31,150
19,500 19,500
682,500 682,500
18,900 18,900
20,800 20,800
29,500 29,500
93,555 37,000

118,550 118,550

33,900 33,900
14,300 14,300
6,450 6,450
16,150 16,150
68,550 68,550
26,550 26,550

19,050 19,050
12,000 12,000
57,500 57,500
45,500
163,650
113,650

72,350 72,350
447,000 447,000
56,700 56,700
43,150 43,150
196,625 223,500
158,895 180,600

8,150 8,600
24,250 24,250
19,900 19,900
39,800

96,450 96,450
160,650 160,650
119,600 119,600
319,300 319,300
15,250 15,250
109,500 113,650

129
HARGA HARGA
SATUAN PERENCANAAN
2014 2015

10,250 10,250

4,950 10,850
5,513 4,500

9,300 9,300
13,000 13,000

21,050 21,050
24,700 26,150

9,188 9,188
16,013 16,013
25,830 25,830

142,100
150,050
170,500
210,250
251,150
292,100
185,250
210,250
251,150
292,100
337,550

6,143 6,143

32,025 35,000
80,850 85,250
110,513 119,350

38,300 40,950
43,200

340,950
284,150
153,450

130
HARGA HARGA
SATUAN PERENCANAAN
2014 2015

24,700 25,050

14,850 14,850
13,000 14,300

3,750 3,750

364,140 364,140

9,818 9,818
2,573 2,573

632,550 632,550
275,650 275,650
117,650 117,650
90,450 90,450
40,900 43,700
63,950 63,950
60,300 61,750
78,400 80,400
26,650 28,450
42,250 42,250
1,398,900 1,398,900
2,098,350 2,098,350
2,019,950 2,019,950
3,002,800 3,002,800
2,809,850 2,809,850
4,220,750 4,220,750
3,521,350 3,521,350
4,935,050 4,935,050
223,100 223,100
114,600 119,350
174,900 174,900
150,750 153,200
211,050 218,600
319,600 319,600
32,550 34,700
51,300 51,300

131
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
307,550 318,600
458,300 458,300
470,750 470,750
719,950 719,950
639,150 639,150
952,700 952,700
988,900 988,900
1,483,300 1,483,300
28,200 30,150
42,850 42,850
23,650 23,650
35,850 35,850
18,700 18,700
28,400 28,400
56,700 56,700
86,050 42,850
44,800 47,750
68,200 68,200
65,850 70,250
100,100 100,100
12,700 12,700
19,200 19,200
84,800 90,500
127,850 127,850
6,950 6,950
10,550 10,550
120,150 120,150
62,100 62,100
54,750 54,750
34,350 37,500
40,900 43,700
999,750 999,750
1,500,950 1,500,950
1,363,800 1,363,800
2,045,250 2,045,250
1,786,300 1,786,300
2,678,400 2,678,400
2,311,800 2,311,800
3,467,050 3,467,050
53,450 57,100
81,100 81,100
75,300 82,150
3,993,650 3,993,650
5,990,600 5,990,600
109,250 120,000
174,300 174,300
153,650 168,000
245,100 245,100
267,000 281,300
400450 400,450
324,200 341,550
486,300 486,300
572,850 572,850
859,850 859,850

132
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
60,555 60,555
92,290 92,290
1,810,435 1,810,435
170,940 170,940
184,910 184,910
354,365 354,365
45,815 45,815
554,455 554,455
1,155,275 1,155,275
1,279,355 1,279,355
359,205 359,205

674,000 674,000
793,500 793,500
1,051,350 1,051,350
1,482,100 1,482,100
1,798,050 1,798,050
150,550 150,550
191,550 191,550
249,650 249,650
319,000 319,000
396,200 396,200
532,000 532,000
733,750 733,750
861,700 861,700
1,223,700 1,223,700
1,752,750 1,752,750
2,088,450 2,088,450
3,509,250 3,509,250
153,050 153,050
189,000 189,000
289,950 289,950
374,250 374,250
444,000 444,000
658,450 658,450
840,850 840,850
1,041,500 1,041,500
1,507,100 1,507,100
1,950,300 1,950,300
2,356,700 2,356,700
186,000 186,000
238,950 238,950
366,400 366,400
483,600 483,600
555,600 555,600
758,100 758,100
966,950 966,950
1,249,150 1,249,150
1,808,450 1,808,450
2,433,850 2,433,850
2,897,400 2,897,400
4,161,850 4,161,850

305,450 305,450

133
HARGA HARGA
SATUAN PERENCANAAN
2014 2015
357,200 357,200
426,050 426,050
651,600 651,600

766,900 766,900

2,900 2,900

36,750 36,750
51,900 51,900
23,250 23,250

2,400 2,400
15,700 15,700

4,600 4,600

33,750 33,750

134
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
7 8 9 10 11

11,900 13,550 13,550 13,550


11,400 13,550 13,550 13,550
2,150 2,250 2,250 2,250
18,000 19,700 19,700 19,700
14,250 15,600 15,600 15,600
14,800 15,600 15,600 15,600
2,000 2,100 2,100 2,100
16,600 17,000 17,000 17,000
325,000 341,250 341,250 341,250

62,000 68,500 70,000 84,000 68,500 68,600


77,000 85,000 78,500 94,200 85,000 85,000
61,000 65,000 58,000 69,600 65,000 65,000
75,000 80,000 72,500 87,000 80,000 80,400
12,250 12,500 12,500 13,988

35,100 35,000 35,000 35,100


15,300 16,500 16,500 16,700
373,750 159,000 145,000 174,000 159,000 159,100
715,875 227,000 210,000 252,000 227,000 227,300
272,100 309,000 350,000 420,000 309,000 309,300
84,000 92,000 80,000 96,000 92,000 92,000
92,000 105,000 89,000 106,800 105,000 105,000
98,150 98,000 98,000 98,150
110,000 114,000 120,000 144,000 114,000 114,050

129,600 129,500 129,500 129,600


1,281,150 1,281,000 1,281,000 1,281,150
2,379,200 2,379,000 2,379,000 2,379,200
617,550 701,000 701,000 701,200

1,281,675 1,455,500 1,455,500 1,455,750

183,050 193,000 228,500 274,200 193,000 193,200


176,950 181,500 175,000 210,000 181,500 181,850
189,150 198,500 198,500 198,900
60,000 60,000 65,000 78,000 60,000 65,000
115,950 115,500 75,000 90,000 115,500 115,950
75,000 75,000 184,000

135
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )

87,000 87,000 87,000 87,000


750 750 750 900 750 750
5,400 5,400 8,000 9,600 5,400 5,400
125,300 135,000 150,000 180,000 135,000 135,000
115,000 115,000 115,000 115,000
103,200 103,000 103,000 103,200
106,400 106,000 106,000 106,400
99,000 99,000 99,000 99,000
24,300 24,300 24,300 24,300
9,400 9,400 9,400 9,400
6,700 6,700 6,700 6,700
140,000 140,000 140,000 140,000
136,000 136,000 136,000 136,000
268,450 268,000 240,000 288,000 268,000 268,450
244,050 244,000 244,000 292,800 244,000 244,050
240,400 240,000 235,000 282,000 240,000 240,400
120,000 120,000 150,000 180,000 120,000 120,000
213,550 213,500 206,500 247,800 213,500 213,550
164,750 164,500 164,500 164,750

50,650 50,650 45,000 54,000 50,650 50,650


40,950 40,950 40,950 40,950
134,500 134,500 134,500 134,500
88,500 136,800 114,000 136,800 136,800 136,800
51,250 53,150 53,150 53,150
39,050 39,050 35,000 42,000 39,050 39,050
24,450 24,450 14,000 16,800 24,450 24,450
3,700 3,700 3,700 3,700
27,500 27,500 27,500 27,500
26,300 26,300 26,300 26,300
65,950 65,950 65,950
187,050 187,000 187,000 187,050
56,500 56,500 56,500 56,500
54,950 54,950 50,000 60,000 54,950 54,950
27,500 27,500 25,000 30,000 27,500 27,500
25,500 25,500 25,500 25,500
9,800 9,800 9,800 9,800
51,250 58,300 58,300 58,300
26,300 26,300 22,000 26,400 26,300 26,300
36,050 36,050 36,050 36,050
36,650 36,650 30,500 36,600 36,650 36,650
4,500 5,150 5,150 5,150
51,250 51,250 35,000 42,000 51,250 51,250
11,650 11,650 21,000 25,200 11,650 11,650
16,650 106,500 95,000 114,000 106,500 106,800
93,950 93,500 97,500 117,000 93,500 93,950
90,950 90,950 87,500 105,000 90,950 90,950
78,050 78,050 74,000 88,800 78,050 78,050
26,850 29,350 29,000 34,800 29,350 29,350
9,800 9,800 20,000 24,000 9,800 9,800
36,650 36,650 30,500 36,600 36,650 36,650
128,000 126,000 105,000 126,000 126,000 126,000
142,600 142,600 135,000 162,000 142,600 142,600

136
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
57,550 57,550 57,550 57,550

187,050 187,000 185,000 222,000 187,000 187,050

137
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )

42,750 42,000 35,000 42,000 42,000 42,000


158,650 158,500 135,000 162,000 158,500 158,650
774,800 774,000 645,000 774,000 774,000 774,000

82,400 82,000 88,000 105,600 82,000 82,400


53,700 53,500 57,000 68,400 53,500 53,700
78,750 78,500 76,000 91,200 78,500 78,750
111,700 111,500 109,000 130,800 111,500 111,700
73,250 73,000 65,500 78,600 73,000 73,250
145,200 145,000 145,000 145,200
106,650 106,500 106,500 106,650
117,750 117,500 117,500 117,750
25,500 25,500 23,000 27,600 25,500 25,500
19,300 19,300 19,300 19,300
23,250 23,250 23,250 23,250
46,200 46,200 46,200 46,200
73,100 73,000 73,000 73,100
9,750 9,750 9,750 9,750
34,150 24,000 20,000 24,000 24,000 24,000
46,450 46,450 46,450 46,450
48,250 48,250 48,250 48,250
51,700 51,700 51,700 51,700

57,350 57,350 55,000 66,000 57,350 57,350


62,250 62,250 60,000 72,000 62,250 62,250
69,550 69,550 65,000 78,000 69,550 69,550
76,900 76,900 70,000 84,000 76,900 76,900
84,200 84,200 75,000 90,000 84,200 84,200

14,500 14,500 11,500 13,800 14,500 15,000


100,050 100,050 100,050 100,050
231,800 231,800 231,800 231,800
140,650 140,650 140,650 140,650
197,750 197,750 197,750 197,750
272,450 272,450 272,450 272,450
14,000 14,000 15,000 18,000 14,000 14,500
14,000 14,000 15,000 18,000 14,000 14,500
29,100 29,100 29,100 29,100
212,950 212,950 212,950 212,950
33,750 33,750 85,000 102,000 33,750 33,750
20,250 20,250 20,250 20,250

13,500 13,500 10,900 13,080 13,500 14,000

12,500 13,000 10,500 12,600 13,000 13,000


13,000 13,200 11,000 13,200 13,200 13,200
176,700 169,900 169,900 169,900
95,950 93,500 78,000 93,600 93,500 93,600
84,500 73,000 61,200 73,440 73,000 73,440

138
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )

354,500 354,500 354,600

6,050 6,500 5,700 6,840 6,500 6,500


8,000 8,000 7,000 8,400 8,000 8,000
6,150 6,150 6,000 7,200 6,150 6,150
13,300 13,450 11,500 13,800 13,450 13,450

8,800 8,800 8,000 9,600 8,800 8,800


11,000 11,000 10,000 12,000 11,000 11,000
4,050 4,100 4,000 4,800 4,100 4,100

10,400 10,400 10,400 10,400


2,100 2,200 2,600 3,120 2,200 2,300
2,000 1,250 1,250 1,250
10,550 10,550 10,000 12,000 10,550 10,550
58,700 58,700 58,700 58,700
12,190 13,500 11,300 13,560 13,500 13,560
39,675 30,000 24,000 28,800 30,000 28,800

88,800 88,800 88,800 88,800


105,750 105,750 105,750 105,750
117,750 117,750 117,750 117,750

53,400 53,000 53,000 53,400


63,450 63,000 63,000 63,450
73,250 77,000 77,000 77,300
85,450 85,000 85,000 85,450
67,150 67,000 67,000 67,150
109,850 109,500 109,500 109,850
79,350 79,000 79,000 79,350
146,450 146,000 146,000 146,450
91,550 91,500 91,500 91,550

584,700 584,500 584,500 584,700


73,900 73,500 73,500 73,900
24,000 24,000 24,000 24,000
4,450 4,450 4,450 4,450
62,450 62,450 75,000 90,000 62,450 62,450
50,150 50,150 55,000 66,000 50,150 50,150
103,700 103,700 110,000 132,000 103,700 103,700
92,800 92,800 100,000 120,000 92,800 92,800
58,400 58,400 58,400 58,400

139
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )

4,900 4,900 4,900 4,900


4,300 4,550 4,550 4,550

81,650 81,500 81,500 81,650


143,000 143,000 143,300
128,150 113,500 94,800 113,760 113,500 113,760
68,650 68,500 68,500 68,650
84,550 84,500 84,500 84,550
61,050 61,000 61,000 61,050
68,350 67,000 56,000 67,200 67,000 67,200
72,500 78,000 65,000 78,000 78,000 78,000
86,650 86,000 75,000 90,000 86,000 86,650
92,500 95,000 86,650 103,980 95,000 97,650
94,500 85,500 102,600 94,500 94,600
18,350 18,000 19,000 22,800 18,000 18,350
108,050 68,000 57,000 68,400 68,000 68,400
56,150 54,000 45,000 54,000 54,000 54,000
68,000 96,000 115,200 68,000 68,200
22,300 25,000 25,000 25,400
52,400 55,000 52,400 62,880 55,000 59,700
36,000 36,500 34,500 41,400 36,500 36,650

67,150 67,150 67,150 67,150


33600 33600 33600 33600

1,300,000 1,430,000 1,430,000 1,430,000


143,400 143,400 143,400 143,400
109,850 109,850 109,850 109,850
2,440,200 2,440,200 2,440,200 2,440,200

103,450 103,450 103,450 103,450

193,200 193,200 193,200


274,550 274,550 274,550 274,550
372,050 372,050 372,050 372,050
1,022,800 1,022,800 1,022,800

700,900 700,900 700,900 700,900


357,300 357,300 357,300 357,300
595,650 595,650 595,650 595,650
170,850 170,850 170,850

21,600 21,600 21,600


30,550 30,550 30,550 30,550
381,300 381,300 381,300
451,150 451,150 451,150

11,000 11,000 11,000 11,000

518,150 518,150 518,150 518,150


582,900 582,900 582,900 582,900

140
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
394,150 394,150 394,150 394,150
1,000 1,000 1,000 1,000
53,050 53,050 53,050 53,050
53,300 53,300 53,300 53,300
56,450 56,450 56,450 56,450
61,450 61,450 61,450 61,450
32,450 32,450 32,450 32,450
50,450 51,250 51,250 51,250
45,650 48,250 48,250 48,250
53,500 54,350 54,350 54,350
20,000 20,000 20,000 20,000
62,500 62,500 62,500 62,500
83,000 83,000 83,000

6,750 6,750 6,750 6,750


11,650 11,650 11,650 11,650
16,550 16,550 16,550 16,550
17,100 17,100 17,100 17,100
19,550 19,550 19,550 19,550

12,250 13,400 13,400 13,400


8,550 8,550 8,550 8,550

573,950 573,950 573,950 573,950


323,900 323,900 323,900 323,900
466,350 466,350 466,350 466,350
242,350 242,350 242,350 242,350
250,100 250,100 250,100 250,100
242,350 242,350 242,350 242,350

24,450 24,450 24,450 24,450


24,450 24,450 24,450 24,450
14,500 14,500 14,500 14,500

1,300 1,300 1,300 1,300

589,400 589,400 589,400 589,400


330,700 330,700 330,700 330,700

141
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
466,350 466,350 466,350 466,350
272,100 272,100 272,100 272,100
301,150 301,150 301,150

198,900 198,900 198,900

350 350 350 350

142
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )

100,100 100,100 100,100 100,100

88,650 88,650 88,650 88,650


71,850 68,650 68,650 68,650
18,350 18,350 18,350 18,350

62,250 62,250 62,250 62,250


94,600 94,600 94,600 94,600
131,200 131,200 131,200 131,200
39,700 39,700 39,700 39,700
59,250 59,250 59,250 59,250

13,750 13,750 13,750 13,750


15,000 15,000 15,000 15,000
17,800 17,800 17,800 17,800
18,700 18,700 18,700 18,700
27,050 27,050 27,050 27,050
30,150 30,150 30,150 30,150

48,850 48,850 48,850 48,850


30,550 30,550 30,550 30,550

97,500 106,000 106,000 106,000


120,000 123,000 123,000 123,000
115,000 135,000 135,000 135,000
130,000 155,000 155,000 155,000
20,750 20,750 20,750 20,750
29,300 29,300 29,300 29,300

18,000 19,550 19,550 19,550

19,750 19,750 19,750 19,750


3,000,000 3,000,000 3,000,000 3,300,000
160,950 160,950 160,950 160,950
18,009,150 18,009,150 ### ### 18,009,150 18,000,000
18,009,150 18,009,150 ### ### 18,009,150 18,000,000
7,873,350 7,873,350 ### ### 7,873,350 7,873,350
13,031,500 13,031,500 ### ### 13,031,500 13,031,500
13,446,700 13,446,700 ### ### 13,446,700 13,446,700

143
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
18,009,150 18,009,150 ### ### 18,009,150 18,000,000
10,000,000 11,000,000 ### ### 11,000,000 11,000,000
12,500,000 12,500,600 ### ### 12,500,600 12,500,600
9,975,000 10,795,950 7,000,000 8,400,000 10,795,950 8,400,000
7,930,650 7,930,650 6,900,000 8,280,000 7,930,650 7,930,650
8,925,000 8,925,000 7,500,000 9,000,000 8,925,000 8,925,000
7,350,000 8,000,000 7,000,000 8,400,000 8,000,000 8,000,000
7,930,650 7,930,650 5,000,000 6,000,000 7,930,650 6,000,000
6,100,500 6,100,500 4,500,000 5,400,000 6,100,500 5,400,000
8,540,700 8,540,700 4,700,000 5,640,000 8,540,700 5,640,000
6,100,500 6,100,500 4,500,000 5,400,000 6,100,500 5,400,000
5,490,450 5,490,450 5,490,450 5,490,450
5,490,450 5,490,450 3,700,000 4,440,000 5,490,450 4,440,000
5,673,500 5,673,500 3,700,000 4,440,000 5,673,500 4,440,000
4,725,000 4,725,000 3,700,000 4,440,000 4,725,000 4,440,000
150,000 150,000 150,000 157,500
190,000 195,000 195,000 224,200
106,000 106,000 106,000 106,000
143,400 143,400 143,400 143,400
138,550 138,550 138,550 138,550
77,200 77,200 77,200 77,200
127,450 127,450 127,450 127,450
140,200 140,200 110,000 132,000 140,200 132,000
58,000 58,000 55,000 66,000 58,000 58,000
69,550 69,550 65,000 78,000 69,550 69,550
79,350 81,850 79,000 94,800 81,850 81,850
100,050 100,050 100,050 100,050

1,427,550 1,427,550 1,427,550 1,427,550


396,550 396,550 396,550 396,550
597,850 597,850 597,850 597,850
390,450 390,450 390,450 390,450
219,650 219,650 219,650 219,650
359,950 359,950 359,950 359,950

218,200 218,200 218,200


245,500 245,500 245,500
300,050 300,050 300,050
231,850 231,850 231,850
654,600 654,600 654,600
2,045,550 2,045,550 2,045,550
1,176,200 1,176,200 1,176,200

6,500 6,500 6,500 6,500


10,000 10,900 10,900 10,900
5,500 5,500 5,500 5,500

40,000 40,000 40,000 40,000

10,200 10,200 10,200 10,200

144
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )

15,750 15,750 15,750 15,750


18,250 18,250 18,250 18,250
24,350 24,350 24,350 24,350
30,450 30,450 30,450 30,450
401,500 401,500 401,500 401,500

19,200 19,200 19,200 19,200


827,250 827,250 827,250 827,250
25,200 25,200 25,200 25,200
31,150 31,150 31,150 31,150
19,500 19,500 19,500 19,500
682,500 682,500 682,500 682,500
18,900 18,900 18,900 18,900
20,800 20,800 20,800 20,800
29,500 29,500 29,500 29,500
93,555 37,000 37,000 37,000

118,550 118,550 118,550 118,550

33,900 33,900 33,900 33,900


14,300 14,300 14,300 14,300
6,450 6,450 6,450 6,450
16,150 16,150 16,150 16,150
68,550 68,550 68,550 68,550
26,550 26,550 26,550 26,550

19,050 19,050 19,050 19,050


12,000 12,000 12,000 12,000
57,500 57,500 57,500 57,500
45,500 45,500 45,500
163,650 163,650 163,650
113,650 113,650 113,650

72,350 72,350 72,350 72,350


447,000 447,000 447,000 447,000
56,700 56,700 56,700 56,700
43,150 43,150 43,150 43,150
196,625 223,500 223,500 223,500
158,895 180,600 180,600 180,600

8,150 8,600 8,600 8,600


24,250 24,250 24,250 24,250
19,900 19,900 19,900 19,900
39,800 39,800 39,800

96,450 96,450 96,450 96,450


160,650 160,650 160,650 160,650
119,600 119,600 119,600 119,600
319,300 319,300 319,300 319,300
15,250 15,250 15,250 15,250
109,500 113,650 113,650 113,650

145
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )

10,250 10,250 10,250 10,250

4,950 10,850 10,850 10,850


5,513 4,500 4,500 4,500

9,300 9,300 9,300 9,300


13,000 13,000 13,000 13,000

21,050 21,050 21,050 21,050


24,700 26,150 26,150 26,150

9,188 9,188 9,188 9,188


16,013 16,013 16,013 16,013
25,830 25,830 25,830 25,830

142,100 142,100 142,100


150,050 150,050 150,050
170,500 170,500 170,500
210,250 210,250 210,250
251,150 251,150 251,150
292,100 292,100 292,100
185,250 185,250 185,250
210,250 210,250 210,250
251,150 251,150 251,150
292,100 292,100 292,100
337,550 337,550 337,550

6,143 6,143 6,143 6,143

32,025 35,000 35,000 35,000


80,850 85,250 85,250 85,250
110,513 119,350 119,350 119,350

38,300 40,950 40,950 40,950


43,200 43,200 43,200

340,950 340,950 340,950


284,150 284,150 284,150
153,450 153,450 153,450

146
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )

24,700 25,050 25,050 25,050

14,850 14,850 14,850 14,850


13,000 14,300 14,300 14,300

3,750 3,750 3,750 3,750

364,140 364,140 364,140 364,140

9,818 9,818 9,818 9,818


2,573 2,573 2,573 2,573

632,550 632,550 632,550 632,550


275,650 275,650 275,650 275,650
117,650 117,650 117,650 117,650
90,450 90,450 90,450 90,450
40,900 43,700 43,700 43,700
63,950 63,950 63,950 63,950
60,300 61,750 61,750 61,750
78,400 80,400 80,400 80,400
26,650 28,450 28,450 28,450
42,250 42,250 42,250 42,250
1,398,900 1,398,900 1,398,900 1,398,900
2,098,350 2,098,350 2,098,350 2,098,350
2,019,950 2,019,950 2,019,950 2,019,950
3,002,800 3,002,800 3,002,800 3,002,800
2,809,850 2,809,850 2,809,850 2,809,850
4,220,750 4,220,750 4,220,750 4,220,750
3,521,350 3,521,350 3,521,350 3,521,350
4,935,050 4,935,050 4,935,050 4,935,050
223,100 223,100 223,100 223,100
114,600 119,350 119,350 119,350
174,900 174,900 174,900 174,900
150,750 153,200 153,200 153,200
211,050 218,600 218,600 218,600
319,600 319,600 319,600 319,600
32,550 34,700 34,700 34,700
51,300 51,300 51,300 51,300

147
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
307,550 318,600 318,600 318,600
458,300 458,300 458,300 458,300
470,750 470,750 470,750 470,750
719,950 719,950 719,950 719,950
639,150 639,150 639,150 639,150
952,700 952,700 952,700 952,700
988,900 988,900 988,900 988,900
1,483,300 1,483,300 1,483,300 1,483,300
28,200 30,150 30,150 30,150
42,850 42,850 42,850 42,850
23,650 23,650 23,650 23,650
35,850 35,850 35,850 35,850
18,700 18,700 18,700 18,700
28,400 28,400 28,400 28,400
56,700 56,700 56,700 56,700
86,050 42,850 42,850 42,850
44,800 47,750 47,750 47,750
68,200 68,200 68,200 68,200
65,850 70,250 70,250 70,250
100,100 100,100 100,100 100,100
12,700 12,700 12,700 12,700
19,200 19,200 19,200 19,200
84,800 90,500 90,500 90,500
127,850 127,850 127,850 127,850
6,950 6,950 6,950 6,950
10,550 10,550 10,550 10,550
120,150 120,150 120,150 120,150
62,100 62,100 62,100 62,100
54,750 54,750 54,750 54,750
34,350 37,500 37,500 37,500
40,900 43,700 43,700 43,700
999,750 999,750 999,750 999,750
1,500,950 1,500,950 1,500,950 1,500,950
1,363,800 1,363,800 1,363,800 1,363,800
2,045,250 2,045,250 2,045,250 2,045,250
1,786,300 1,786,300 1,786,300 1,786,300
2,678,400 2,678,400 2,678,400 2,678,400
2,311,800 2,311,800 2,311,800 2,311,800
3,467,050 3,467,050 3,467,050 3,467,050
53,450 57,100 57,100 57,100
81,100 81,100 81,100 81,100
75,300 82,150 82,150 82,150
3,993,650 3,993,650 3,993,650 3,993,650
5,990,600 5,990,600 5,990,600 5,990,600
109,250 120,000 120,000 120,000
174,300 174,300 174,300 174,300
153,650 168,000 168,000 168,000
245,100 245,100 245,100 245,100
267,000 281,300 281,300 281,300
400450 400,450 400,450 400,450
324,200 341,550 341,550 341,550
486,300 486,300 486,300 486,300
572,850 572,850 572,850 572,850
859,850 859,850 859,850 859,850

148
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
60,555 60,555 60,555 60,555
92,290 92,290 92,290 92,290
1,810,435 1,810,435 1,810,435 1,810,435
170,940 170,940 170,940 170,940
184,910 184,910 184,910 184,910
354,365 354,365 354,365 354,365
45,815 45,815 45,815 45,815
554,455 554,455 554,455 554,455
1,155,275 1,155,275 1,155,275 1,155,275
1,279,355 1,279,355 1,279,355 1,279,355
359,205 359,205 359,205 359,205

674,000 674,000 674,000 674,000


793,500 793,500 793,500 793,500
1,051,350 1,051,350 1,051,350 1,051,350
1,482,100 1,482,100 1,482,100 1,482,100
1,798,050 1,798,050 1,798,050 1,798,050
150,550 150,550 150,550 150,550
191,550 191,550 191,550 191,550
249,650 249,650 249,650 249,650
319,000 319,000 319,000 319,000
396,200 396,200 396,200 396,200
532,000 532,000 532,000 532,000
733,750 733,750 733,750 733,750
861,700 861,700 861,700 861,700
1,223,700 1,223,700 1,223,700 1,223,700
1,752,750 1,752,750 1,752,750 1,752,750
2,088,450 2,088,450 2,088,450 2,088,450
3,509,250 3,509,250 3,509,250 3,509,250
153,050 153,050 153,050 153,050
189,000 189,000 189,000 189,000
289,950 289,950 289,950 289,950
374,250 374,250 374,250 374,250
444,000 444,000 444,000 444,000
658,450 658,450 658,450 658,450
840,850 840,850 840,850 840,850
1,041,500 1,041,500 1,041,500 1,041,500
1,507,100 1,507,100 1,507,100 1,507,100
1,950,300 1,950,300 1,950,300 1,950,300
2,356,700 2,356,700 2,356,700 2,356,700
186,000 186,000 186,000 186,000
238,950 238,950 238,950 238,950
366,400 366,400 366,400 366,400
483,600 483,600 483,600 483,600
555,600 555,600 555,600 555,600
758,100 758,100 758,100 758,100
966,950 966,950 966,950 966,950
1,249,150 1,249,150 1,249,150 1,249,150
1,808,450 1,808,450 1,808,450 1,808,450
2,433,850 2,433,850 2,433,850 2,433,850
2,897,400 2,897,400 2,897,400 2,897,400
4,161,850 4,161,850 4,161,850 4,161,850

305,450 305,450 305,450 305,450

149
HPS HPS HARGA HPS HPS
HS + 20% 2015
2014 2015 SURVEI 2015
( Awal )
357,200 357,200 357,200 357,200
426,050 426,050 426,050 426,050
651,600 651,600 651,600 651,600

766,900 766,900 766,900 766,900

2,900 2,900 2,900 2,900

36,750 36,750 36,750 36,750


51,900 51,900 51,900 51,900
23,250 23,250 23,250 23,250

2,400 2,400 2,400 2,400


15,700 15,700 15,700 15,700

4,600 4,600 4,600 4,600

150
HARGA HARGA
SATUAN 2013 SATUAN 2012

6 7

10,750 10,750 3,050

10,250 10,250 3,550

16,400 16,400 3,300

11,650 11,650 3,950

60,050 56,900 (10,100) (17.75)

73,900 69,500 (12,100) (17.41)

72,050 68,550 (12,250) (17.87)

10,900 9,850 4,700 47.72

35,100 35,100 1,700

15,150 15,150 2,700

239,750 239,750 (9,150)

272,100 272,100 40,750

78,050 74,850 17,650 23.58

92,100 83,750 39,550 47.22

98,150 98,150 (650)

114,050 101,100 22,650 22.40

129,600 129,600 21,450

168,050 167,600 134,400 80.19

144,050 137,200 164,800 120.12

186,050 183,750 (8,750) (4.76)

96,300 96,300 (21,300)

107,200 107,200 27,050

151
HARGA HARGA
SATUAN 2013 SATUAN 2012

18,050 79,550 1,850 2.33

800 750 (50) (6.67)

5,000 5,000 1,000

114,050 121,300 22,450 18.51

106,500 104,200 (700) (0.67)

95,500 93,850 21,950 23.39

98,500 96,000 2,300 2.40

91,500 89,850 6,250 6.96

22,500 22,500 (700)

8,700 8,700 1,200

5,400 5,400 2,600

129,600 129,600 7,000

125,900 125,900 15,800

220,000 176,150 82,550 46.86

207,800 207,800 55,100 26.52

217,900 182,100 70,850 38.91

113,700 113,700 26,150 23.00

234,650 154,350 81,850 53.03

153,050 141,750 39,450 27.83

50,650 50,650 (25,450)

40,300 38,950 850 2.18

72,050 320,400 (199,400) (62.23)

87,050 84,250 124,350 147.60

50,450 46,800 3,800 8.12

33,700 36,200 (1,100) (3.04)

21,700 23,650 1,750 7.40

3,700 2,750 550 20.00

27,050 59,250 (17,550) (29.62)

24,650 30,050 11,650 38.77

3,950 3,950 56,050

187,050 187,050 (1,300) (0.70)

55,550 50,100 11,450 22.85

24,050 22,350 5,850 26.17

25,500 16,250 11,750 72.31

9,700 13,900 (2,200) (15.83)

51,250 51,250 7,700

24,050 22,350 4,650 20.81

35,500 22,350 13,650 61.07

34,300 45,150 (4,650) (10.30)

44,700 44,700 (40,100)

50,450 46,800 6,350 13.57

11,450 11,250 3,150 28.00

16,350 54,450 56,300 103.40

84,050 76,100 23,500 30.88

89,500 59,845 (3,945) (6.59)

76,800 51,298 5,703 11.12

24,050 28,650 (50) (0.17)

8,500 11,750 250 2.13

36,050 54,900 (15,500) (28.23)

125,900 63,940 25,060 39.19

140,350 104,880 (8,780) (8.37)

152
HARGA HARGA
SATUAN 2013 SATUAN 2012

56,650 41,860 (860) (2.05)

154,250

153
HARGA HARGA
SATUAN 2013 SATUAN 2012

81,050 98,200 (8,500) (8.66)

50,450 75,600 (22,500) (29.76)

77,450 80,100 (26,100) (32.58)

109,900 113,050 (36,050) (31.89)

72,050 75,100 (28,850) (38.42)

145,200 145,200 (5,500)

106,650 106,650 (3,150)

117,750 117,750 (3,950)

25,500 25,500 1,000

19,300 19,300 (2,000)

23,250 23,250 (2,350)

46,200 46,200 (3,900)

73,100 73,100 (7,400)

9,750 9,750 (1,050)

34,150 34,150 (14,150)

46,450 46,450 (4,650)

48,250 48,250 (18,250)

51,700 51,700 (5,200)

17,000 21,450 (8,450) (39.39)

100,050 99,550 10,450 10.50

231,800 231,300 10,950 4.73

140,650 140,150 5,300 3.78

197,750 197,250 4,150 2.10

272,450 271,950 500 0.18

14,500 20,300 (7,550) (37.19)

14,100 20,550 (7,800) (37.96)

29,100 30,450 (1,350) (4.43)

212,950 212,950 -

33,750 33,250 45,750 137.59

20,250 19,750 13,250 67.09

14,200 14,200 (3,700) (26.06)

14,500 14,500 (3,500) (24.14)

169,900 169,900 (151,800)

154
HARGA HARGA
SATUAN 2013 SATUAN 2012

6,050 6,000 - -

7,900 7,550 1,350 17.88

6,050 5,600 1,150 20.54

13,300 10,500 4,250 40.48

8,800 8,800 -

10,250 8,000 3,000 37.50

4,050 3,900 700 17.95

10,250 8,000 2,000 25.00

2,100 1,800 300 16.67

2,000 1,600 (250) (15.63)

10,550 9,400 - -

58,700 58,700 (5,900)

88,800
105,750
117,750

52,550 37,450 10,550 28.17

62,500 49,900 10,800 21.64

72,050 71,750 (1,750) (2.44)

54,050 96,700 (3,600) (3.72)

66,100 78,750 (13,750) (17.46)

61,250 112,250 (950) (0.85)

78,050 100,600 (29,200) (29.03)

72,050 157,500 (57,500) (36.51)

90,050 93,550 29,550 31.59

584,700 584,700 -

73,900 73,900 -

20,100 20,100 5,800

4,450 4,450 50

62,450 62,450 42,200

50,150 50,150 52,850

103,700 103,700 4,000

92,800 92,800 27,200

58,400 58,400 5,300

155
HARGA HARGA
SATUAN 2013 SATUAN 2012

4,900 4,750 250 5.26

4,250 4,200 700 16.67

81,650 81,650 (30,650)

134,700 134,700 (69,700)

126,100 163,600 (96,600) (59.05)

68,650 68,650 (31,650)

84,550 84,550 (42,550)

63,050 51,450 (1,450) (2.82)

58,650 58,650 (650)

70,900 65,500 2,500 3.82

79,300 75,100 5,400 7.19

88,900 86,650 (12,550) (14.48)

93,050 76,500 8,600 11.24

18,050 19,000 1,000 5.26

106,300 93,550 12,650 13.52

55,250 44,650 8,450 18.92

73,100 73,100 800

22,300 22,300 3,350

52,400 52,400 (2,400)

36,050 32,450 550 1.69

67,150 67,150 -

33600 33600 -

1,300,000 1,246,700 213,200 17.10

141,050 139,150 13,650 9.81

108,050 121,050 (11,250) (9.29)

2,400,150 1,932,400 267,600 13.85

103,450 103,450 5,100

279,350 279,350 (87,650)

270,050 415,050 (62,650) (15.09)

372,050 530,550 15,650 2.95

658,240 658,240 272,960


-

700,900 700,900 -

357,300 357,300 -

595,650 595,650 (50)


201,650 #DIV/0!

54,900 54,900 355,800

30,050 49,700 (14,700) (29.58)

315,300 315,300 31,800

373,050 373,050 37,650

518,150 518,150 (51,850)

582,900 582,900 (58,300)

156
HARGA HARGA
SATUAN 2013 SATUAN 2012

394,150 394,150 (111,350)

1,000 1,600 (700) (43.75)

53,050 53,050 1,200

53,300 53,300 4,650

56,450 56,450 (1,150)

61,450 61,450 (4,550)

32,450 32,450 (7,450)

50,450 47,800 4,800 10.04

45,650 43,350 2,150 4.96

53,500 50,700 (100) (0.20)

19,300 19,300 4,200 21.76

62,500 53,300 2,900 5.44

6,700 5,850 2,150 36.75

11,450 9,000 3,350 37.22

16,250 13,150 5,300 40.30

14,500 15,000 3,600 24.00

18,050 23,650 (900) (3.81)

12,050 12,600 1,500 11.90

34,300 70,650 (62,500) (88.46)

573,950 573,950 (10,950)

323,900 323,900 (8,300)

466,350 466,350 (8,950)

242,350 242,350 (4,650)

250,100 250,100 (4,800)

242,350 242,350 (24,250)

24,050 29,700 (7,500) (25.25)

24,050 32,850 (8,400) (25.57)

14,500 22,350 (6,500) (29.08)

1,300 2,150 (1,050) (48.84)

589,400 589,400 -

330,700 330,700 -

157
HARGA HARGA
SATUAN 2013 SATUAN 2012

466,350 466,350 73,500

272,100 272,100 -

216,250 216,250 15,350

166,250 166,250 1,085,650

267,500 267,500 (79,200)

350 250 50 20.00

158
HARGA HARGA
SATUAN 2013 SATUAN 2012

100,100 100,100 9,250

88,650 81,100 12,200 15.04

68,650 68,650 (6,950) (10.12)

18,050 18,750 (1,550) (8.27)

61,250 63,150 (11,550) (18.29)

93,050 88,500 (28,500) (32.20)

129,050 117,900 400 0.34

39,050 46,400

58,250 68,950

13,750 13,750 (1,350)

15,000 15,000 (1,500)

17,800 17,800 (1,800)

18,700 18,700 (1,900)

27,050 27,050 (2,750)

30,150 30,150 (3,050)

48,050 36,700 (26,600) (72.48)

29,650 29,650 (1,450) (4.89)

18,050 16,250 3,300 20.31

19,750 19,750 1,800 9.11

2,152,800 2,152,800 1,411,250 65.55

160,950 160,950 2,839,050 1,763.93

18,009,150 18,009,150 - -

18,009,150 18,009,150 - -

7,873,350 7,873,350 - -

13,031,500 13,031,500 - -

13,446,700 13,446,700 - -

159
HARGA HARGA
SATUAN 2013 SATUAN 2012

18,009,150 18,009,150 - -

7,821,100 7,821,100 4,250,650 54.35

10,614,350 10,614,350 2,032,250 19.15

9,500,000 8,820,200 2,101,850 23.83

7,800,400 7,430,050 1,192,650 16.05

8,500,000 8,032,500 1,739,850 21.66

7,000,000 6,539,700 708,350 10.83

6,900,400 6,588,750 548,750 8.33

6,000,300 7,297,500 (1,759,800) (24.12)

7,680,000 6,615,000 1,071,600 16.20

6,000,300 5,853,750 669,450 11.44

5,400,300 4,692,700 693,400 14.78

5,400,300 4,641,000 745,100 16.05

5,580,300 5,091,650 474,050 9.31

4,669,850 4,669,850 405,450 8.68

157,500 157,500 (62,500) (39.68)

224,200 224,200 (74,200) (33.10)

106,000 106,000 (10,600) (10.00)

143,400 143,400 (14,400) (10.04)

138,550 138,550 (13,950) (10.07)

77,200 77,200 (1,700) (2.20)

127,450 127,450 (12,750) (10.00)

140,200 140,200 (14,100) (10.06)

65,650 65,650 (10,350) (15.77)

73,500 73,500 6,500 8.84

101,850 101,850 (13,200) (12.96)

100,050 100,050 650 0.65

1,404,100

4,500 4,500 2,850 63.33

10,000 10,900 (1,650) (15.14)

4,500 4,500 1,250 27.78

38,500 38,500 1,500 3.90

10,200 10,200 - -

160
HARGA HARGA
SATUAN 2013 SATUAN 2012

15,750 15,750 - -

18,250 18,250 (2,450) (13.42)

24,350 24,350 (2,750) (11.29)

30,450 30,450 (5,450) (17.90)

401,500 401,500 (126,500) (31.51)

19,200 19,200 5,300 27.60

827,250 827,250 (82,750) (10.00)

25,200 25,200 (500) (1.98)

31,150 31,150 (3,150) (10.11)

19,500 19,500 2,000 10.26

682,500 682,500 (647,500) (94.87)

18,900 18,900 (1,900) (10.05)

20,800 20,800 (2,100) (10.10)

29,500 29,500 (14,500) (49.15)

118,550 118,500 (11,900) (10.04)

33,900 33,900 (13,900) (41.00)

14,300 14,300 (4,300) (30.07)

6,450 6,450 (450) (6.98)

16,150 16,150 2,350 14.55

68,550 68,550 (8,550) (12.47)

26,550 26,550 (6,550) (24.67)

19,050 19,050 (1,550) (8.14)

12,000 12,000 1,500 12.50

57,500 57,500 (12,500) (21.74)

72,350 72,350 1,350 1.87

447,000 447,000 (44,700) (10.00)

56,700 56,700 18,300 32.28

43,150 43,150 3,900 9.04

8,150 8,150 1,650 20.25

24,250 24,250 (4,250) (17.53)

19,900 19,900 (1,800) (9.05)

40,000 40,000 (20,000) (50.00)

96,450 96,450 (9,650) (10.01)

160,650 160,650 25,650 15.97

119,600 119,600 9,650 8.07

319,300 319,300 (169,300) (53.02)

15,250 15,250 (350) (2.30)

109,500 109,500 25,500 23.29

161
HARGA HARGA
SATUAN 2013 SATUAN 2012

10,250 10,250 19,400 189.27

4,950 4,950 4,050 81.82

5,513 5,513 (1,513) (27.44)

9,200 7,665 835 10.89

12,900 10,868 2,132 19.62

20,850 22,680 (1,680) (7.41)

24,500 26,408 (3,408) (12.91)

9,188 9,188 (88) (0.96)

16,013 16,013 (13) (0.08)

25,830 25,830 (30) (0.12)

6,143 6,143 (243) (3.96)

32,025 32,025 2,975 9.29

80,850 80,850 5,400 6.68

110,513 110,513 10,237 9.26

37,900 39,060 (2,260) (5.79)

162
HARGA HARGA
SATUAN 2013 SATUAN 2012

24,500 28,770 (12,970) (45.08)

14,700 20,370 (4,670) (22.93)

12,900 14,700 (3,200) (21.77)

3,700 6,038 (2,288) (37.89)

422,678 422,678 (211,278) (49.99)

9,818 9,818 282 2.87

2,573 2,573 277 10.77

632,550 632,550 (63,350) (10.02)

275,650 275,650 (27,650) (10.03)

117,050 106,600 15,000 14.07

90,050 81,750 11,650 14.25

38,800 36,250 7,750 21.38

63,700 57,600 8,300 14.41

60,050 47,500 14,700 30.95

78,050 62,350 18,650 29.91

25,300 23,750 4,950 20.84

42,050 37,700 5,300 14.06

1,392,150 1,296,950 183,050 14.11

2,088,150 1,945,400 274,700 14.12

2,010,150 1,853,200 261,700 14.12

2,988,150 2,915,250 257,150 8.82

2,796,150 2,607,350 (709,350) (27.21)

4,200,250 3,911,000 552,300 14.12

3,504,250 3,259,000 460,300 14.12

4,911,050 4,888,500 412,700 8.44

222,050 203,200 28,600 14.07

114,050 105,500 14,900 14.12

174,050 158,250 22,250 14.06

150,050 135,450 19,050 14.06

210,050 193,150 27,350 14.16

318,100 289,750 40,950 14.13

30,900 27,250 1,750 6.42

51,050 45,900 6,400 13.94

163
HARGA HARGA
SATUAN 2013 SATUAN 2012

306,050 281,500 39,800 14.14

456,100 422,250 59,650 14.13

445,700 444,050 61,650 13.88

716,500 666,050 94,050 14.12

636,100 587,000 82,800 14.11

948,100 976,500 28,200 2.89

984,100 856,050 185,650 21.69

1,476,100 1,545,150 17,450 1.13

27,700 25,150 8,550 34.00

42,700 39,850 5,550 13.93

22,900 21,550 3,750 17.40

35,700 33,450 4,550 13.60

18,050 17,550 2,450 13.96

28,250 26,300 3,800 14.45

46,300 47,500 13,500 28.42

85,650 80,150 11,350 14.16

37,250 38,950 9,150 23.49

67,900 63,350 8,850 13.97

52,900 57,800 13,000 22.49

99,700 93,150 13,050 14.01

12,050 12,000 1,600 13.33

19,150 18,000 2,400 13.33

67,900 75,600 15,700 20.77

127,300 119,900 17,000 14.18

6,700 9,650 (2,150) (22.28)

10,450 10,350 850 8.21

119,600 111,800 15,900 14.22

61,850 57,750 8,150 14.11

54,550 50,950 7,150 14.03

34,250 26,250 12,450 47.43

38,800 33,250 10,750 32.33

994,900 931,750 131,550 14.12

1,493,650 1,397,650 197,350 14.12

1,357,200 1,269,950 179,350 14.12

2,035,350 1,904,950 268,950 14.12

1,777,550 1,525,250 372,750 24.44

2,665,400 2,494,850 352,250 14.12

2,300,550 1,934,000 522,800 27.03

3,450,250 3,229,300 456,000 14.12

50,600 47,750 9,750 20.42

80,700 75,550 10,650 14.10

74,950 70,250 14,850 21.14

3,974,250 3,410,050 833,850 24.45

5,961,550 5,120,250 1,245,750 24.33

108,750 100,750 22,750 22.58

173,500 162,300 22,900 14.11

152,900 142,250 31,350 22.04

243,950 228,200 32,200 14.11

265,750 248,600 35,000 14.08

398,550 372,900 (28,400) (7.62)

322,700 301,900 #REF! #REF!

483,900 452,800 63,900 14.11

570,100 533,850 75,450 14.13

855,700 800,750 113,150 14.13

164
HARGA HARGA
SATUAN 2013 SATUAN 2012

55,050 55,050 (7,750) (14.08)

83,900 83,900 (900) (1.07)

1,645,850 1,645,850 130,150 7.91

155,400 155,400 (1,600) (1.03)

168,100 168,100 1,700 1.01

322,150 322,150 (3,250) (1.01)

41,650 41,650 (1,050) (2.52)

504,050 504,050 (5,050) (1.00)

1,050,250 1,050,250 (10,550) (1.00)

1,163,050 1,163,050 75,550 6.50

326,550 326,550 (3,350) (1.03)

670,800 kode urutan Harga Pipa Galvanis Disesuaikan dengan harga 2013
789,700 koreksi link.........ada perubahan
1,046,300
1,474,950
1,789,350
149,850
190,650
248,450
317,500
394,250
529,400
730,200
857,550
1,217,800
1,744,250
2,078,350
3,492,200
152,350
188,100
288,600
372,500
441,850
648,950
836,750
1,036,450
1,499,750
1,940,800
2,345,200
185,150
237,800
364,650
481,250
552,950
754,400
962,300
1,243,100
1,799,700
2,422,000
2,883,350
4,141,600

305,450 305,450 - -

165
HARGA HARGA
SATUAN 2013 SATUAN 2012

357,200 357,200 - -

426,050 426,050 - -

651,600 651,600 - -

766,900 766,900 (76,700) (10.00)

2,900 2,900 250 8.62

222,100 222,100 (181,850) (81.88)

51,900 51,900 - -

23,250 23,250 - -

2,400 2,400 250 10.42

15,700 17,500 (350) (2.00)

4,600 4,600 73,750 1,603.26

166
- 51 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Pekerjaan Finishing
K Pekerjaan Kusen, Pintu, & Jendela
1 Pasang Kaca Mati tebal 5 mm m2
Tenaga:
Mandor 0.0008 O.H Rp 100,000.00
Kepala Tukang Kayu 0.0150 O.H Rp 95,000.00
Tukang Kayu 0.1500 O.H Rp 90,000.00
Pekerja 0.0150 O.H Rp 70,000.00
Bahan:
Kaca Polos Tebal 5 mm 1.1000 m2 Rp 126,000.00
Sealant 0.0500 kg Rp 10,950.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
2 Pemasangan Kusen Alumunium Profil 4" Putih m1
Tenaga:
Mandor 0.0021 O.H Rp 100,000.00
Kepala Tukang besi 0.0043 O.H Rp 95,000.00
Tukang besi 0.0430 O.H Rp 90,000.00
Pekerja 0.0430 O.H Rp 70,000.00
Bahan:
Profil 4" Putih ( 4 x 10 ) 1.1000 m1 Rp 120,000.00
Skrup/Ripet 2.0000 Buah Rp 350.00
Sealent 0.0600 Botol Rp 10,950.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
L Sanitair
1 Pemasangan Kran Air Model Engkol Buah
Tenaga:
Mandor 0.0050 O.H Rp 100,000.00
Kepala Tukang Pipa 0.0400 O.H Rp 95,000.00
Tukang Pipa 0.4000 O.H Rp 90,000.00
Pekerja 0.0100 O.H Rp 70,000.00
Bahan:
Kran Air merk onda Type CLS 04 / Setara 1.0000 Buah Rp 75,000.00
Seal Tape 0.0250 Biji Rp 3,200.00
- 52 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
2 Pemasangan Kloset Duduk ex. INA komplit Buah
Tenaga:
Mandor 0.1600 O.H Rp 100,000.00
Kepala Tukang batu 0.0100 O.H Rp 95,000.00
Tukang Batu 1.1000 O.H Rp 90,000.00
Pekerja 3.3000 O.H Rp 70,000.00
Bahan:
Kloset Duduk ex. Toto komplit 1.0000 Buah Rp 1,500,000.00
Perlengkapan : 6.0000 % Rp 1,500,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 53 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
3 Pemasangan Wastafel Bahan Keramik Buah
Tenaga:
Mandor 0.0600 O.H Rp 100,000.00
Kepala Tukang batu 0.1500 O.H Rp 95,000.00
Tukang Batu 1.4500 O.H Rp 90,000.00
Pekerja 1.2000 O.H Rp 70,000.00
Bahan:
Wastafel Bahan Keramik 1.0000 Buah Rp 371,400.00
Semen portland 6.0000 Kg Rp 1,212.50
Pasir Pasang 0.0100 m3 Rp 310,000.00
Perlengkapan: 12.0000 % Rp 371,400.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
4 Pemasangan Floor Drain Buah
Tenaga:
Mandor 0.0050 O.H Rp 100,000.00
Kepala Tukang Batu 0.0100 O.H Rp 95,000.00
Tukang Batu 0.1000 O.H Rp 90,000.00
Pekerja 0.0100 O.H Rp 70,000.00
Bahan:
Floor drain 1.0000 Buah Rp 60,000.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
5 Pemasangan Kran Bebek Fio 10 JC Buah
Tenaga:
Mandor 0.0050 O.H Rp 100,000.00
Kepala Tukang Pipa 0.0400 O.H Rp 95,000.00
Tukang Pipa 0.4000 O.H Rp 90,000.00
Pekerja 0.0100 O.H Rp 70,000.00
Bahan:
Kran Bebek Fio 10 JC 1.0000 Buah Rp 175,000.00
Seal Tape 1.0000 biji Rp 3,200.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 54 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
N Pipa
1 Pekerjaan Besi Pipa Stainless 2 " m1
Bahan:
Besi Pipa Stainless 2 " 1.0000 m1 Rp 108,600.00
Upah:
Ongkos kerja pemasangan + Elektrode 3.2708 m1 Rp 9,570.15
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
2 Pasang Pipa PVC Type AW dia. 3/4" m1
Tenaga:
Mandor 0.0020 O.H Rp 100,000.00
Kepala Tukang Pipa 0.0060 O.H Rp 95,000.00
Tukang Pipa 0.0600 O.H Rp 90,000.00
Pekerja 0.0360 O.H Rp 70,000.00
Bahan:
Pipa PVC AW Dia. 3/4" 1.2000 m1 Rp 7,912.50
Perlengkapan 35.0000 % Rp 7,912.50
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 55 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
3 Pasang Pipa PVC Type AW dia. 1" m1
Tenaga:
Mandor 0.0020 O.H Rp 100,000.00
Kepala Tukang Pipa 0.0060 O.H Rp 95,000.00
Tukang Pipa 0.0600 O.H Rp 90,000.00
Pekerja 0.0360 O.H Rp 70,000.00
Bahan:
Pipa PVC AW dia. 1" 1.2000 m1 Rp 11,530.00
Perlengkapan 35.0000 % Rp 11,530.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
4 Pemasangan Pipa PVC 3" Type D untuk Talang Pembuluh m1
Tenaga:
Pekerja 0.1350 O.H Rp 70,000.00
Bahan:
Pipa PVC 3" Type D 1.0000 m1 Rp 32,370.00
Klem PVC 1.0000 Buah Rp 3,500.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
18 Pemasangan Pipa PVC 4" Type D untuk Talang Pembuluh m1
Tenaga:
Pekerja 0.1350 O.H Rp 70,000.00
Bahan:
Pipa PVC 4" Panjang 4 Mt type D 1.0000 m1 Rp 45,520.00
Klem PVC 1.0000 Buah Rp 3,500.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
O Pengecatan
1 Pengecatan Bidang Kayu Baru 2 Lapis m2
Tenaga:
Mandor 0.0030 O.H Rp 100,000.00
Kepala Tukang Cat 0.0060 O.H Rp 95,000.00
Tukang cat 0.0090 O.H Rp 90,000.00
Pekerja 0.0700 O.H Rp 70,000.00
- 56 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Bahan:
Plamir 0.1500 Kg Rp 28,500.00
Cat Kayu 0.2600 Kg Rp 61,150.00
Cat meni 0.2000 Kg Rp 29,750.00
Minyak cat 0.0300 Liter Rp 12,350.00
Kertas Gosok 0.2000 Buah Rp 5,000.00
Kuas Cat 0.0100 Buah Rp 8,450.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 57 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
2 Pengecatan Tembok dalam Baru 2 Lapis m2
(Interior Standar)
Tenaga:
Mandor 0.0030 O.H Rp 100,000.00
Kepala Tukang Cat 0.0063 O.H Rp 95,000.00
Tukang cat 0.0630 O.H Rp 90,000.00
Pekerja 0.0200 O.H Rp 70,000.00
Bahan:
Plamir 0.1000 Kg Rp 28,500.00
Kapi 0.0500 Buah Rp 10,550.00
Kertas gosok 0.5000 Lembar Rp 5,000.00
Cat Tembok Interior Standar ( Catylac ) 0.2600 Kg Rp 24,240.00
Roll 0.0100 Buah Rp 23,200.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
3 Pengecatan Tembok luar Baru 2 Lapis (Eksterior) m2
Tenaga:
Mandor 0.0030 O.H Rp 100,000.00
Kepala Tukang Cat 0.0063 O.H Rp 95,000.00
Tukang cat 0.0630 O.H Rp 90,000.00
Pekerja 0.0200 O.H Rp 70,000.00
Bahan:
Cat Tembok Dasar/Alkali 0.1000 Kg Rp 83,115.38
Kuas Cat 0.0500 Buah Rp 8,450.00
Kertas gosok 0.5000 Lembar Rp 5,000.00
Cat Tembok Jotun Eksterior ( Jotashield ) 0.2600 Kg Rp 112,500.00
Roll 0.0100 Buah Rp 23,200.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
P Finishing Dinding
1 Pemasangan Batu Susun Sirih + Finishing m2
Tenaga:
Mandor 0.0350 O.H Rp 100,000.00
Kepala Tukang Batu 0.0350 O.H Rp 95,000.00
Tukang Batu 0.3500 O.H Rp 90,000.00
Pekerja 0.7000 O.H Rp 70,000.00
- 58 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
Bahan:
Semen PC 11.7500 kg Rp 1,212.50
Pasir Pasang 0.0350 m3 Rp 310,000.00
Batu Gilang Asimetris 1.1000 m2 Rp 178,000.00
Coating 1.0000 m2 Rp 77,600.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
Q Instalasi Listrik
1 Pemasangan Titik Stop Kontak Gedung Titik
Tenaga:
Kepala Tukang Listrik 0.0050 O.H Rp 95,000.00
Tukang Listrik 0.5000 O.H Rp 90,000.00
Pekerja 0.0500 O.H Rp 70,000.00
Bahan:
Stop Kontak (broco) 1.0000 buah Rp 20,000.00
Kabel NYA 2,5 mm 15.0000 m1 Rp 10,450.00
Pipa Pralon 5/8 " 0.2000 btg Rp 11,200.00
T Doos Pvc 1.0000 Buah Rp 3,150.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 59 -

HARGA
NOMOR URAIAN KEGIATAN Koef. SATUAN
SATUAN
2 Pemasangan Titik Lampu Titik
Tenaga:
Kepala Tukang Listrik 0.0050 O.H Rp 95,000.00
Tukang Listrik 0.5000 O.H Rp 90,000.00
Pekerja 0.0500 O.H Rp 70,000.00
Bahan:
L Bow 4.0000 buah Rp 5,500.00
Kabel NYA 2,5 mm 24.0000 m1 Rp 10,450.00
Pipa Pralon 5/8 " 3.0000 btg Rp 11,200.00
T Doos Pvc 3.0000 Buah Rp 3,150.00
Sakelar 1.0000 buah Rp 10,950.00
Las Doof 3.0000 buah Rp 500.00
Klem 24.0000 buah Rp 274.00
Mangkok 1.0000 buah Rp 2,500.00
Fiting Plafon 1.0000 Buah Rp 3,600.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
3 Pemasangan MCB Buah
Tenaga:
Kepala Tukang Listrik 0.0050 O.H Rp 95,000.00
Tukang Listrik 0.5000 O.H Rp 90,000.00
Pekerja 0.0500 O.H Rp 70,000.00
Bahan:
Pipa Pralon 5/8 " 3.0000 btg Rp 11,200.00
Kabel NYA 2,5 mm 15.0000 m1 Rp 10,450.00
T Doos Pvc 1.0000 buah Rp 3,150.00
L Bow 2.0000 buah Rp 5,500.00
Klem 24.0000 buah Rp 274.00
MCB 1.0000 buah Rp 211,400.00
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 60 -

HARGA

Rp 75.00
Rp 1,425.00
Rp 13,500.00
Rp 1,050.00

Rp 138,600.00
Rp 547.50
Rp 155,197.50
Rp 15,519.75
Rp 170,717.25

Rp 210.00
Rp 408.50
Rp 3,870.00
Rp 3,010.00

Rp 132,000.00
Rp 700.00
Rp 657.00
Rp 140,855.50
Rp 14,085.55
Rp 154,941.05

Rp 500.00
Rp 3,800.00
Rp 36,000.00
Rp 700.00

Rp 75,000.00
Rp 80.00
- 61 -

HARGA

Rp 116,080.00
Rp 11,608.00
Rp 127,688.00

Rp 16,000.00
Rp 950.00
Rp 99,000.00
Rp 231,000.00

Rp 1,500,000.00
Rp 90,000.00
Rp 1,936,950.00
Rp 193,695.00
Rp 2,130,645.00
- 62 -

HARGA

Rp 6,000.00
Rp 14,250.00
Rp 130,500.00
Rp 84,000.00

Rp 371,400.00
Rp 7,275.00
Rp 3,100.00
Rp 44,568.00
Rp 661,093.00
Rp 66,109.30
Rp 727,202.30

Rp 500.00
Rp 950.00
Rp 9,000.00
Rp 700.00

Rp 60,000.00
Rp 71,150.00
Rp 7,115.00
Rp 78,265.00

Rp 500.00
Rp 3,800.00
Rp 36,000.00
Rp 700.00

Rp 175,000.00
Rp 3,200.00
Rp 219,200.00
Rp 21,920.00
Rp 241,120.00
- 63 -

HARGA

Rp 108,600.00

Rp 31,302.05
Rp 139,902.05
Rp 13,990.20
Rp 153,892.25

Rp 200.00
Rp 570.00
Rp 5,400.00
Rp 2,520.00

Rp 9,495.00
Rp 2,769.38
Rp 20,954.38
Rp 2,095.44
Rp 23,049.81
- 64 -

HARGA

Rp 200.00
Rp 570.00
Rp 5,400.00
Rp 2,520.00

Rp 13,836.00
Rp 4,035.50
Rp 26,561.50
Rp 2,656.15
Rp 29,217.65

Rp 9,450.00

Rp 32,370.00
Rp 3,500.00
Rp 45,320.00
Rp 4,532.00
Rp 49,852.00

Rp 9,450.00

Rp 45,520.00
Rp 3,500.00
Rp 58,470.00
Rp 5,847.00
Rp 64,317.00

Rp 300.00
Rp 570.00
Rp 810.00
Rp 4,900.00
- 65 -

HARGA

Rp 4,275.00
Rp 15,899.00
Rp 5,950.00
Rp 370.50
Rp 1,000.00
Rp 84.50
Rp 34,159.00
Rp 3,415.90
Rp 37,574.90
- 66 -

HARGA

Rp 300.00
Rp 598.50
Rp 5,670.00
Rp 1,400.00

Rp 2,850.00
Rp 527.50
Rp 2,500.00
Rp 6,302.40
Rp 232.00
Rp 20,380.40
Rp 2,038.04
Rp 22,418.44

Rp 300.00
Rp 598.50
Rp 5,670.00
Rp 1,400.00

Rp 8,311.54
Rp 422.50
Rp 2,500.00
Rp 29,250.00
Rp 232.00
Rp 48,684.54
Rp 4,868.45
Rp 53,552.99

Rp 3,500.00
Rp 3,325.00
Rp 31,500.00
Rp 49,000.00
- 67 -

HARGA

Rp 14,246.88
Rp 10,850.00
Rp 195,800.00
Rp 77,600.00
Rp 385,821.88
Rp 38,582.19
Rp 424,404.06

Rp 475.00
Rp 45,000.00
Rp 3,500.00

Rp 20,000.00
Rp 156,750.00
Rp 2,240.00
Rp 3,150.00
Rp 231,115.00
Rp 23,111.50
Rp 254,226.50
- 68 -

HARGA

Rp 475.00
Rp 45,000.00
Rp 3,500.00

Rp 22,000.00
Rp 250,800.00
Rp 33,600.00
Rp 9,450.00
Rp 10,950.00
Rp 1,500.00
Rp 6,576.00
Rp 2,500.00
Rp 3,600.00
Rp 389,951.00
Rp 38,995.10
Rp 428,946.10

Rp 475.00
Rp 45,000.00
Rp 3,500.00

Rp 33,600.00
Rp 156,750.00
Rp 3,150.00
Rp 11,000.00
Rp 6,576.00
Rp 211,400.00
Rp 471,451.00
Rp 47,145.10
Rp 518,596.10
- 74 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

INFRASTRUKTUR JALAN
R Perkerasan Paving
2 Pemasangan Paving Stone (Blok) Tbl.6 cm ( Lokal Kw 1) m2
+ Pasir Urug tbl 5cm
Tenaga:
Mandor 0.0013 O.H
Kepala Tukang Batu 0.0500 O.H
Tukang Batu 0.5000 O.H
Pekerja 0.2500 O.H
Bahan:
Paving Stone Abu-2 Tb 6 Cm ( Lokal Kw 1 ) 1.0100 m2
Pasir Urug 0.0500 m3
Peralatan
Peralatan 10.0000 %
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
3 Pemasangan Paving Block Tbl.6 cm Abu-abu + Pasir Urug m2
tbl 5cm
Tenaga:
Mandor 0.0013 O.H
Kepala Tukang Batu 0.0500 O.H
Tukang Batu 0.5000 O.H
Pekerja 0.2500 O.H
Bahan:
Paving block uk. 21.21.6 Abu-abu / corso K 300 1.0100 m2
Setara ex. Focon
Pasir Urug 0.0500 m3
Peralatan
Peralatan 10.0000 %
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
4 Pemasangan Paving Block Tbl.8 cm Abu-abu + Pasir Urug m2
tbl 10cm
Tenaga:
Mandor 0.0013 O.H
Kepala Tukang Batu 0.0500 O.H
- 75 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Tukang Batu 0.5000 O.H


Pekerja 0.2500 O.H
Bahan:
Paving block uk. 21.21.8 Abu-abu / corso K 300 1.0100 m2
Setara ex. Focon
Pasir Urug 0.1000 m3
Peralatan
Peralatan 10.0000 %
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
5 Pemasangan Paving Block Tbl.6 cm Warna + Pasir Urug m2
tbl 5cm
Tenaga:
Mandor 0.0013 O.H
Kepala Tukang Batu 0.0500 O.H
Tukang Batu 0.5000 O.H
Pekerja 0.2500 O.H
Bahan:
Paving block uk. 21.21.6 Merah / corso K 300 Setara 1.0100 m2
ex. Focon
Pasir Urug 0.0500 m3
Peralatan
Peralatan 10.0000 %
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
6 Pemasangan Paving Block Tbl.8 cm Warna + Pasir Urug m2
tbl 10cm
Tenaga:
Mandor 0.0013 O.H
Kepala Tukang Batu 0.0500 O.H
Tukang Batu 0.5000 O.H
Pekerja 0.2500 O.H
Bahan:
Paving block uk. 21.21.8 Merah / corso K 300 Setara 1.0100 m2
ex. Focon
Pasir Urug 0.1000 m3
Peralatan
- 76 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Peralatan 10.0000 %
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
Pemasangan Grass Block, t = 6 cm m2
Tenaga:
Mandor 0.0250 O.H
Kepala Tukang Batu 0.0250 O.H
Tukang Batu 0.2500 O.H
Pekerja 0.7500 O.H
Bahan:
Grass Block Tb 6 Cm 1.0500 m2
(3 Berlian-DT 1) Nilai HSPK :
7 Pemasangan Grass Block uk. 21.5 cm x 42 cm, t = 10 cm m2
Tenaga:
Mandor 0.0013 O.H
Kepala Tukang Batu 0.0500 O.H
Tukang Batu 0.5000 O.H
Pekerja 0.2500 O.H
Bahan:
Grass Block Tb 10 Cm setara ex. Focon 1.0500 m2
Penanaman Rumput 0.2891 m2
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
8 Kanstin Trap uk. t= 20, l=10 m1
Tenaga:
Mandor 0.0010 O.H
Kepala Tukang Batu 0.0100 O.H
Tukang Batu 0.0500 O.H
Pekerja 0.1000 O.H
Bahan:
Semen PC (portland Cement) 0.0474336 zak
Pasir Pasang 0.0061763 m3
Kanstin Trap uk. 10.20.40 setara ex. Focon 2.7500 bh
Jumlah
Overhead + Profit ( 10 % )
- 77 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Nilai HSPK :
9 Kanstin Trap uk. t= 30, l=15/20 m1
Tenaga:
Mandor 0.0010 O.H
Kepala Tukang Batu 0.0100 O.H
Tukang Batu 0.1000 O.H
Pekerja 0.2000 O.H
Bahan:
Semen PC (portland Cement) 0.0638 zak
Pasir Pasang 0.0020 m3
Kanstin Trap uk. 15/20.30.50 Setara ex. Focon 2.2000 bh
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
10 Stopper/Uskup m1
Tenaga:
Mandor 0.0010 O.H
Kepala Tukang Batu 0.0100 O.H
Tukang Batu 0.0500 O.H
Pekerja 0.0500 O.H
Bahan:
Pasir Pasang 0.0010 m3
Stopper/uskup 3.3400 Buah
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :

Stopper/Uskup tebal 8 cm m1
Tenaga:
Mandor 0.0010 O.H
Kepala Tukang Batu 0.0100 O.H
Tukang Batu 0.1000 O.H
Pekerja 0.2000 O.H
Bahan:
Pasir Pasang 0.0010 m3
Stopper/uskup 3.3400 Buah
Nilai HSPK :
- 78 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Perkerasan Jalan raya


Pengadaan Kerikil Sungai Tidak Disaring Menggunakan m3
Alat
Tenaga:
Mandor 0.0063 O.H
Operator Terampil 0.0125 O.H
Sopir Terampil 0.0500 O.H
Pekerja / Buruh Tak Terampil 0.0063 O.H
Bahan:
Sirtu 1.0000 m3
Peralatan:
Sewa alat bantu 0.0025 Unit
Bulldozer 110 HP 0.0188 Jam
Wheel Loader 80 HP 0.0375 Jam
Dumptruck 8 - 10 m3 0.3000 Jam
Nilai HSPK :
Pengadaan Kerikil Sungai Tidak Disaring (Menggunakan m3
Buruh)
Tenaga:
Mandor 0.0333 O.H
Sopir Terampil 0.1000 O.H
Pekerja / Buruh Tak Terampil 1.0000 O.H
Bahan:
Sirtu 1.0000 m3
Peralatan:
Sewa alat bantu 0.0417 Jam
Dumptruck 3 - 4 m3 0.6000 Jam
Nilai HSPK :
Produksi Kerikil Pecah Tersaring Mempergunakan Kerikil m3
Sungai (Menggunakan Alat)

Tenaga:
Mandor 0.0167 O.H
Operator Terampil 0.0500 O.H
Operator Kurang Terampil 0.0333 O.H
Sopir Terampil 0.0667 O.H
Pekerja / Buruh Tak Terampil 0.0667 O.H
Pekerja / Buruh Semi Terampil 0.0667 O.H
- 79 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Bahan:
Kerikil Sungai 1.3333 m3
Peralatan:
Sewa alat bantu 0.0417 Jam
Bulldozer 110 HP 0.1000 Jam
Mesin Pecah Batu 200 HP 0.1000 Jam
Wheel Loader 80 HP 0.1000 Jam
Dumptruck 8 - 10 m3 0.4000 Jam
Nilai HSPK :
Produksi dan Suplai Aspal Beton U/Lapis Pondasi Atas TON
(LASTON ATAS) dg Alat.
Tenaga:
Mandor 0.0100 O.H
Operator Terampil 0.0300 O.H
Pembantu Operator 0.0300 O.H
Sopir Terampil 0.0400 O.H
Pembantu Sopir 0.0400 O.H
Pekerja / Buruh Tak Terampil 0.0600 O.H
Pekerja / Buruh Terampil 0.0300 O.H
Bahan:
Pasir Beton 0.2400 m3
Aspal Curah 60.000 Kg
Portland Cement (40 Kg) 0.3700 Zak
Kapur Pasang 0.0200 m3
Kerikil Pecah tersaring 0.3100 m3
Peralatan:
Sewa alat bantu 0.0024 Unit
Wheel Loader 115 HP 0.0500 Jam
Mesin Pencampur Aspal 0.0500 Jam
Dumptruck 8 - 10 m3 0.2400 Jam
Nilai HSPK :
Produksi dan Suplai Lapis Tipis Aspal Beton (LATASTON ) TON
dg Alat/Mesin.
Tenaga:
Mandor 0.0100 O.H
Operator Terampil 0.0300 O.H
Pembantu Operator 0.0300 O.H
Sopir Terampil 0.0400 O.H
- 80 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Pembantu Sopir 0.0400 O.H


Pekerja / Buruh Tak Terampil 0.0600 O.H
Pekerja / Buruh Terampil 0.0300 O.H
Bahan:
Pasir Beton 0.3100 m3
Aspal Curah 73.000 Kg
Portland Cement (40 Kg) 0.9000 Zak
Kapur 0.0100 m3
Kerikil Pecah tersaring 0.2250 m3
Peralatan:
Sewa alat bantu 0.0024 Unit
Wheel Loader 115 HP 0.0500 Jam
Mesin Pencampur Aspal 0.0500 Jam
Dumptruck 8 - 10 m3 0.2400 Jam
Nilai HSPK :
Produksi & Suplai Aspal Beton (LASTON ) Menggunakan TON
Alat/Mesin.
Tenaga:
Mandor 0.0100 O.H
Operator Terampil 0.0300 O.H
Pembantu Operator 0.0300 O.H
Sopir Terampil 0.0400 O.H
Pembantu Sopir 0.0400 O.H
Pekerja / Buruh Tak Terampil 0.0600 O.H
Pekerja / Buruh Terampil 0.0300 O.H
Bahan:
Pasir Beton 0.2700 m3
Aspal Curah 70.000 Kg
Portland Cement (40 Kg) 1.0000 Zak
Kerikil Pecah tersaring 0.2750 m3
Peralatan:
Sewa alat bantu 0.0024 Unit
Wheel Loader 115 HP 0.0500 Jam
Mesin Pencampur Aspal 0.0500 Jam
Dumptruck 8 - 10 m3 0.2400 Jam
Nilai HSPK :
Membuat Parit Galian Menggunakan Buruh m3
Tenaga:
- 81 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Mandor 0.0185 O.H


Sopir Terampil 0.0370 O.H
Pekerja / Buruh Tak Terampil 0.6667 O.H
Peralatan:
Sewa alat bantu 0.0278 Unit
Dumptruck 3 - 4 m3 0.1852 Jam
Nilai HSPK :
Membentuk Badan Jalan / Subgrade dengan Timbunan m3
Menggunakan Buruh
Tenaga:
Mandor 0.0333 O.H
Operator Terampil 0.0167 O.H
Pembantu Operator 0.0167 O.H
Sopir Terampil 0.0167 O.H
Pembantu Sopir 0.0167 O.H
Pekerja / Buruh Tak Terampil 1.0000 O.H
Bahan:
Tanah Urug 1.2000 m3
Peralatan:
Sewa alat bantu 0.0400 Unit
Mesin Gilas Roda Karet 8-15 T 0.0833 Jam
Truck Tangki air 68 HP 0.0833 Jam
Nilai HSPK :
Membentuk Bahu Jalan Keras Menggunakan Alat m3
Tenaga:
Mandor 0.0050 O.H
Operator Terampil 0.0050 O.H
Pekerja / Buruh Tak Terampil 0.0200 O.H
Pekerja / Buruh Semi Terampil 0.0100 O.H
Bahan:
Kerikil Sungai Tak Disaring 1.2500 m3
Peralatan:
Sewa alat bantu 0.0400 Set
Grader 110 HP 0.0250 Jam
Mesin Gilas Bergetar 1 Ton 0.0500 Jam
Nilai HSPK :
Memotong Bahu Jalan Tinggi Menggunakan Buruh m2
Tenaga:
- 82 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Mandor 0.0208 O.H


Sopir Terampil 0.0833 O.H
Pekerja / Buruh Tak Terampil 0.8333 O.H
Peralatan:
Sewa alat bantu 0.0333 Unit
Dumptruck 3 - 4 m3 0.4167 Jam
Nilai HSPK :
Konstruksi Lapis Pondasi Bawah (LPB) Kelas B m3
Menggunakan Buruh
Tenaga:
Mandor 0.0333 O.H
Operator Terampil 0.0167 O.H
Sopir Terampil 0.0167 O.H
Pekerja / Buruh Tak Terampil 1.1000 O.H
Bahan:
Batu Pecah 3-5cm 0.1667 m3
Batu Pecah 2-3 cm 0.1833 m3
Batu Pecah 1-2 cm 0.1250 m3
Batu Pecah 0,5-1 cm 0.1833 m3
Pasir Urug 0.5417 m3
Peralatan:
Sewa alat bantu 0.0200 Unit
Vibratory Roller 0.0833 Jam
Truck Tangki air 68 HP 0.0667 Jam
Mesin Gilas Roda Karet 8-15 T 0.0833 Jam
Nilai HSPK :
Konstruksi Lapis Pondasi Bawah (LPB) m3
Kelas C Menggunakan Buruh
Tenaga:
Mandor 0.0500 O.H
Operator Terampil 0.0167 O.H
Sopir Terampil 0.0167 O.H
Pekerja / Buruh Tak Terampil 1.0000 O.H
Bahan:
Batu Kali 1.2500 m3
Peralatan:
Sewa alat bantu 0.0417 Unit
Vibratory Roller 0.0833 Jam
- 83 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Truck Tangki air 68 HP 0.0833 Jam


Nilai HSPK :
Konstruksi Lapis Pondasi Bawah (LPB) Telford m3
Menggunakan Buruh
Tenaga:
Mandor 0.0375 O.H
Operator Terampil 0.0125 O.H
Pekerja / Buruh Tak Terampil 1.2375 O.H
Bahan:
Batu Pecah 15/20 cm 1.1200 m3
Batu Pecah 5/7 cm 0.2500 m3
Pasir Urug 0.3750 m3
Peralatan:
Sewa alat bantu 0.0500 Unit
Mesin Gilas 3 Roda 8-10 T 0.0625 Jam
Nilai HSPK :
Konstruksi Lapis Pondasi Atas (LPA) Kelas A m3
Menggunakan Buruh
Tenaga:
Mandor 0.0167 O.H
Operator Terampil 0.0167 O.H
Sopir Terampil 0.0167 O.H
Pekerja / Buruh Tak Terampil 1.1000 O.H
Bahan:
Pasir Urug 0.1250 m3
Kerikil Pecah Tersaring 1.2500 m3
Peralatan:
Sewa alat bantu 0.0458 Unit
Vibratory Roller 0.0833 Jam
Truck Tangki air 68 HP 0.0833 Jam
Nilai HSPK :
Menghampar Lapis Pondasi Atas Aspal Beton (LASTON m3
ATAS) / ATB L Menggunakan Alat

Tenaga:
Mandor 0.0222 O.H
Operator Terampil 0.0889 O.H
Pembantu Operator 0.0889 O.H
- 84 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Pekerja / Buruh Tak Terampil 0.2667 O.H


Pekerja / Buruh Terampil 0.1778 O.H
Bahan:
ATB (Laston Atas) 2.2222 Ton
Pasir Beton 0.0133 m3
Aspal 4.0000 Kg
Minyak Bakar 1.0000 Ltr
Peralatan:
Sewa alat bantu 0.0107 Unit
Mesin Gilas 3 Roda 8-10 T 0.1111 Jam
Mesin Gilas Roda Karet 8-15 T 0.1111 Jam
Mesin Penyemprot Aspal 1000 L 0.0667 Jam
Mesin Penghampar 1,82 m 0.1111 Jam
Compressor 210 m3/jam 0.0889 Jam
Nilai HSPK :
Laburan Aspal Pasir (BURAS) Menggunakan Alat m2

Tenaga:
Mandor 0.0004 O.H
Operator Terampil 0.0008 O.H
Sopir Terampil 0.0008 O.H
Pekerja / Buruh Tak Terampil 0.0042 O.H
Pekerja / Buruh Semi Terampil 0.0008 O.H
Pekerja / Buruh Terampil 0.0008 O.H
Bahan:
Pasir Beton 0.0179 m3
Aspal 1.2083 Kg
Minyak Bakar 0.1250 Ltr
Peralatan:
Sewa alat bantu 0.0002 Unit
Mesin Gilas 3 Roda 8-10 T 0.0021 Jam
Mesin Penyemprot Aspal 200 L 0.0021 Jam
Dumptruck 8 - 10 m3 0.0042 Jam
Nilai HSPK :
Laburan Aspal Satu Lapis (BURTU) Menggunakan Alat m2

Tenaga:
Mandor 0.0011 O.H
- 85 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Operator Terampil 0.0022 O.H


Pembantu Operator 0.0022 O.H
Sopir Terampil 0.0011 O.H
Pembantu Sopir 0.0011 O.H
Pekerja / Buruh Tak Terampil 0.0133 O.H
Pekerja / Buruh Terampil 0.0022 O.H
Bahan:
Kerikil Pecah Tersaring 0.0167 m3
Aspal 2.0111 Kg
Minyak Bakar 0.5889 Ltr
Peralatan:
Sewa alat bantu 0.0005 Unit
Mesin Gilas 3 Roda 8-10 T 0.0111 Jam
Mesin Penyemprot Aspal 200 L 0.0111 Jam
Dumptruck 8 - 10 m3 0.0111 Jam
Nilai HSPK :
Laburan Aspal Dua Lapis (BURDA) dg Alat m2
Tenaga:
Mandor 0.0017 O.H
Operator Terampil 0.0033 O.H
Pembantu Operator 0.0033 O.H
Sopir Terampil 0.0017 O.H
Pembantu Sopir 0.0017 O.H
Pekerja / Buruh Tak Terampil 0.0200 O.H
Pekerja / Buruh Terampil 0.0033 O.H
Bahan:
Kerikil Pecah Tersaring 0.0267 m3
Aspal 3.1944 Kg
Minyak Bakar 0.7056 Ltr
Peralatan:
Sewa alat bantu 0.0008 Unit
Mesin Gilas 3 Roda 8-10 T 0.0111 Jam
Mesin Penyemprot Aspal 200 L 0.0111 Jam
Dumptruck 8 - 10 m3 0.0111 Jam
Nilai HSPK :
Lapisan Penetrasi Makadam 5 cm (LAPEN) dg Buruh m2

Tenaga:
- 86 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Mandor 0.0043 O.H


Operator Terampil 0.0043 O.H
Sopir Terampil 0.0021 O.H
Pekerja / Buruh Tak Terampil 0.1414 O.H
Pekerja / Buruh Terampil 0.0043 O.H
Bahan:
Batu Pecah 3-5cm 0.0400 m3
Batu Pecah 2-3 cm 0.0155 m3
Batu Pecah 1-2 cm 0.0111 m3
Batu Pecah 0,5-1 cm 0.0066 m3
Pasir Beton 0.0025 m3
Aspal 4.4786 Kg
Minyak Bakar 0.3214 Ltr
Peralatan:
Sewa alat bantu 0.0058 Unit
Mesin Gilas 3 Roda 8-10 T 0.0107 Jam
Mesin Penyemprot Aspal 200 L 0.0107 Jam
Dumptruck 3 - 4 m3 0.0107 Jam
Nilai HSPK :
Penghamparan dan Pemadatan LATASTON Menggunakan m2
Alat
Tenaga:
Mandor 0.0007 O.H
Operator Terampil 0.0027 O.H
Pembantu Operator 0.0027 O.H
Pekerja / Buruh Tak Terampil 0.0080 O.H
Pekerja / Buruh Terampil 0.0053 O.H
Bahan:
HRS (Lataston) 0.0667 Ton
Aspal 0.4000 Kg
Minyak Bakar 0.1000 Ltr
Peralatan:
Sewa alat bantu 0.0003 Set
Mesin Gilas Tandem 6-10 Ton 0.0033 Jam
Mesin Gilas Roda Karet 8-15 T 0.0033 Jam
Mesin Penyemprot Aspal 200 L 0.0033 Jam
Mesin Penghampar 1,82 m 0.0033 Jam
Compressor 210 m3/jam 0.0027 Jam
- 87 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Nilai HSPK :
Pelapisan Ulang atau Penetrasi Makadam m3
7 cm LPA Menggunakan Buruh
Tenaga:
Mandor 0.0857 O.H
Operator Terampil 0.0857 O.H
Sopir Terampil 0.0429 O.H
Pekerja / Buruh Tak Terampil 2.8286 O.H
Pekerja / Buruh Terampil 0.0857 O.H
Bahan:
Batu Pecah 3-5cm 0.8857 m3
Batu Pecah 2-3 cm 0.2371 m3
Batu Pecah 1-2 cm 0.2029 m3
Pasir Beton 0.1586 m3
Aspal 78.571 Kg
Peralatan:
Sewa alat bantu 0.1143 Unit
Mesin Gilas 3 Roda 8-10 T 0.2143 Jam
Mesin Penyemprot Aspal 200 L 0.2143 Jam
Dumptruck 3 - 4 m3 0.2143 Jam
Nilai HSPK :
Menghampar Lapis Permukaan Aspal Beton (LASTON) m2
Menggunakan Alat
Tenaga:
Mandor 0.0011 O.H
Operator Terampil 0.0056 O.H
Pembantu Operator 0.0056 O.H
Pekerja / Buruh Tak Terampil 0.0167 O.H
Pekerja / Buruh Terampil 0.0111 O.H
Bahan:
Pasir Beton 0.0010 m3
Aspal 0.4000 Kg
Minyak Bakar 0.1000 Ltr
Campuran Laston 0.1111 Ton
Peralatan:
Sewa alat bantu 0.0005 Set
Mesin Gilas 3 Roda 8-10 T 0.0056 Jam
Mesin Gilas Tandem 6-10 Ton 0.0056 Jam
- 88 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Mesin Gilas Roda Karet 8-15 T 0.0056 Jam


Mesin Penyemprot Aspal 1000 L 0.0033 Jam
Mesin Penghampar 1,82 m 0.0056 Jam
Compressor 210 m3/jam 0.0044 Jam
Nilai HSPK :
Pembuatan Patok Pengarah/ Pal Tolo uk. 20x20x100 cm Buah

Tenaga:
Mandor 0.0172 OH
Tukang Batu 0.0687 OH
Pekerja / Buruh tak terampil 0.1380 OH
Bahan:
Beton K-175 0.0338 m3
Baja Tulangan 4.2188 Kg
Cat Avian 0.5000 Kg
Peralatan:
Dumptruck 3 - 4 m3 0.1207 Jam
Alat bantu 0.0005 Unit
Nilai HSPK :
Galian Batu ( Patching Aspal ) m3
Tenaga:
Mandor 0.0500 OH
Pekerja / Buruh tak terampil 1.5000 OH
Peralatan:
Compressor 0.1350 Jam
Jack Hammer 0.0500 Unit/hari
Alat bantu 0.0300 Unit
Nilai HSPK :
- 89 -

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 130.00
Rp 95,000.00 Rp 4,750.00
Rp 90,000.00 Rp 45,000.00
Rp 70,000.00 Rp 17,500.00

Rp 65,000.00 Rp 65,650.00
Rp 134,150.00 Rp 6,707.50

Rp 72,357.50 Rp 7,235.75
Jumlah Rp 146,973.25
Overhead + Profit ( 10 % ) Rp 14,697.33
Nilai HSPK : Rp 161,670.58

Rp 100,000.00 Rp 130.00
Rp 95,000.00 Rp 4,750.00
Rp 90,000.00 Rp 45,000.00
Rp 70,000.00 Rp 17,500.00

Rp 96,800.00 Rp 97,768.00

Rp 134,150.00 Rp 6,707.50

Rp 104,475.50 Rp 10,447.55
Jumlah Rp 182,303.05
Overhead + Profit ( 10 % ) Rp 18,230.31
Nilai HSPK : Rp 200,533.36

Rp 100,000.00 Rp 130.00
Rp 95,000.00 Rp 4,750.00
- 90 -

HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 45,000.00
Rp 70,000.00 Rp 17,500.00

Rp 115,500.00 Rp 116,655.00

Rp 134,150.00 Rp 13,415.00

Rp 130,070.00 Rp 13,007.00
Jumlah Rp 210,457.00
Overhead + Profit ( 10 % ) Rp 21,045.70
Nilai HSPK : Rp 231,502.70

Rp 100,000.00 Rp 130.00
Rp 95,000.00 Rp 4,750.00
Rp 90,000.00 Rp 45,000.00
Rp 70,000.00 Rp 17,500.00

Rp 108,800.00 Rp 109,888.00

Rp 134,150.00 Rp 6,707.50

Rp 116,595.50 Rp 11,659.55
Jumlah Rp 195,635.05
Overhead + Profit ( 10 % ) Rp 19,563.51
Nilai HSPK : Rp 215,198.56

Rp 100,000.00 Rp 130.00
Rp 95,000.00 Rp 4,750.00
Rp 90,000.00 Rp 45,000.00
Rp 70,000.00 Rp 17,500.00

Rp 143,000.00 Rp 144,430.00

Rp 134,150.00 Rp 13,415.00
- 91 -

HARGA
HARGA
SATUAN
Rp 157,845.00 Rp 15,784.50
Jumlah Rp 241,009.50
Overhead + Profit ( 10 % ) Rp 24,100.95
Nilai HSPK : Rp 265,110.45

Rp 100,000.00 Rp 2,500.00
Rp 95,000.00 Rp 2,375.00
Rp 90,000.00 Rp 22,500.00
Rp 70,000.00 Rp 52,500.00

Rp 137,777.78 Rp 144,666.67
Nilai HSPK : Rp 224,541.67

Rp 100,000.00 Rp 130.00
Rp 95,000.00 Rp 4,750.00
Rp 90,000.00 Rp 45,000.00
Rp 70,000.00 Rp 17,500.00

Rp 143,000.00 Rp 150,150.00
Rp 45,952.50 Rp 13,284.87
Jumlah Rp 230,814.87
Overhead + Profit ( 10 % ) Rp 23,081.49
Nilai HSPK : Rp 253,896.35

Rp 100,000.00 Rp 100.00
Rp 95,000.00 Rp 950.00
Rp 90,000.00 Rp 4,500.00
Rp 70,000.00 Rp 7,000.00

Rp 48,500.00 Rp 2,300.53
Rp 310,000.00 Rp 1,914.64
Rp 25,820.00 Rp 71,005.00
Jumlah Rp 87,770.17
Overhead + Profit ( 10 % ) Rp 8,777.02
- 92 -

HARGA
HARGA
SATUAN
Nilai HSPK : Rp 96,547.18

Rp 100,000.00 Rp 100.00
Rp 95,000.00 Rp 950.00
Rp 90,000.00 Rp 9,000.00
Rp 70,000.00 Rp 14,000.00

Rp 48,500.00 Rp 3,092.36
Rp 310,000.00 Rp 613.80
Rp 58,600.00 Rp 128,920.00
Jumlah Rp 156,676.16
Overhead + Profit ( 10 % ) Rp 15,667.62
Nilai HSPK : Rp 172,343.78

Rp 100,000.00 Rp 100.00
Rp 95,000.00 Rp 950.00
Rp 90,000.00 Rp 4,500.00
Rp 70,000.00 Rp 3,500.00

Rp 310,000.00 Rp 310.00
Rp 3,075.00 Rp 10,270.50
Jumlah Rp 19,630.50
Overhead + Profit ( 10 % ) Rp 1,963.05
Nilai HSPK : Rp 21,593.55

Rp 100,000.00 Rp 100.00
Rp 95,000.00 Rp 950.00
Rp 90,000.00 Rp 9,000.00
Rp 70,000.00 Rp 14,000.00

Rp 310,000.00 Rp 310.00
Rp 3,075.00 Rp 10,270.50
Nilai HSPK : Rp 34,630.50
- 93 -

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 625.00
Rp 90,000.00 Rp 1,125.00
Rp 90,000.00 Rp 4,500.00
Rp 67,500.00 Rp 421.88

Rp 175,000.00 Rp 175,000.00

Rp 98,400.00 Rp 246.00
Rp 313,250.00 Rp 5,873.44
Rp 454,400.00 Rp 17,040.00
Rp 56,666.67 Rp 17,000.00
Nilai HSPK : Rp 221,831.31

Rp 100,000.00 Rp 3,333.33
Rp 90,000.00 Rp 9,000.00
Rp 67,500.00 Rp 67,500.00

Rp 175,000.00 Rp 175,000.00

Rp 98,400.00 Rp 4,100.00
Rp 46,666.67 Rp 28,000.00
Nilai HSPK : Rp 286,933.33

Rp 100,000.00 Rp 1,666.67
Rp 90,000.00 Rp 4,500.00
Rp 75,000.00 Rp 2,500.00
Rp 90,000.00 Rp 6,000.00
Rp 67,500.00 Rp 4,500.00
Rp 65,000.00 Rp 4,333.33
- 94 -

HARGA
HARGA
SATUAN

Rp 98,300.00 Rp 131,066.67

Rp 98,400.00 Rp 4,100.00
Rp 313,250.00 Rp 31,325.00
Rp 716,450.00 Rp 71,645.00
Rp 454,400.00 Rp 45,440.00
Rp 56,666.67 Rp 22,666.67
Nilai HSPK : Rp 329,743.33

Rp 100,000.00 Rp 1,000.00
Rp 90,000.00 Rp 2,700.00
Rp 90,000.00 Rp 2,700.00
Rp 90,000.00 Rp 3,600.00
Rp 78,800.00 Rp 3,152.00
Rp 67,500.00 Rp 4,050.00
Rp 70,000.00 Rp 2,100.00

Rp 302,000.00 Rp 72,480.00
Rp 13,800.00 Rp 828,000.00
Rp 46,800.00 Rp 17,316.00
Rp - Rp -
Rp 329,743.33 Rp 102,220.43

Rp 98,400.00 Rp 236.16
Rp 454,400.00 Rp 22,720.00
Rp 5,980,000.00 Rp 299,000.00
Rp 56,666.67 Rp 13,600.00
Nilai HSPK : Rp 1,374,874.59

Rp 100,000.00 Rp 1,000.00
Rp 90,000.00 Rp 2,700.00
Rp 90,000.00 Rp 2,700.00
Rp 90,000.00 Rp 3,600.00
- 95 -

HARGA
HARGA
SATUAN
Rp 78,800.00 Rp 3,152.00
Rp 67,500.00 Rp 4,050.00
Rp 70,000.00 Rp 2,100.00

Rp 302,000.00 Rp 93,620.00
Rp 13,800.00 Rp 1,007,400.00
Rp 46,800.00 Rp 42,120.00
Rp - Rp -
Rp 329,743.33 Rp 74,192.25

Rp 98,400.00 Rp 236.16
Rp 454,400.00 Rp 22,720.00
Rp 5,980,000.00 Rp 299,000.00
Rp 56,666.67 Rp 13,600.00
Nilai HSPK : Rp 1,572,190.41

Rp 100,000.00 Rp 1,000.00
Rp 90,000.00 Rp 2,700.00
Rp 90,000.00 Rp 2,700.00
Rp 90,000.00 Rp 3,600.00
Rp 78,800.00 Rp 3,152.00
Rp 67,500.00 Rp 4,050.00
Rp 70,000.00 Rp 2,100.00

Rp 302,000.00 Rp 81,540.00
Rp 13,800.00 Rp 966,000.00
Rp 46,800.00 Rp 46,800.00
Rp 329,743.33 Rp 90,679.42

Rp 98,400.00 Rp 236.16
Rp 454,400.00 Rp 22,720.00
Rp 5,980,000.00 Rp 299,000.00
Rp 56,666.67 Rp 13,600.00
Nilai HSPK : Rp 1,539,877.58
- 96 -

HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 1,851.85
Rp 90,000.00 Rp 3,333.33
Rp 65,000.00 Rp 43,333.33

Rp 98,400.00 Rp 2,733.33
Rp 46,666.67 Rp 8,641.98
Nilai HSPK : Rp 59,893.83

Rp 100,000.00 Rp 3,333.33
Rp 90,000.00 Rp 1,500.00
Rp 90,000.00 Rp 1,500.00
Rp 90,000.00 Rp 1,500.00
Rp 78,800.00 Rp 1,313.33
Rp 65,000.00 Rp 65,000.00

Rp 75,000.00 Rp 90,000.00

Rp 98,400.00 Rp 3,936.00
Rp 348,700.00 Rp 29,058.33
Rp 108,281.25 Rp 9,023.44
Nilai HSPK : Rp 206,164.44

Rp 100,000.00 Rp 500.00
Rp 90,000.00 Rp 450.00
Rp 65,000.00 Rp 1,300.00
Rp 67,500.00 Rp 675.00

Rp 221,831.31 Rp 277,289.14

Rp 98,400.00 Rp 3,936.00
Rp 454,400.00 Rp 11,360.00
Rp 59,400.00 Rp 2,970.00
Nilai HSPK : Rp 298,480.14
- 97 -

HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 2,083.33
Rp 90,000.00 Rp 7,500.00
Rp 65,000.00 Rp 54,166.67

Rp 98,400.00 Rp 3,280.00
Rp 46,666.67 Rp 19,444.44
Nilai HSPK : Rp 86,474.44

Rp 100,000.00 Rp 3,333.33
Rp 90,000.00 Rp 1,500.00
Rp 90,000.00 Rp 1,500.00
Rp 65,000.00 Rp 71,500.00

Rp 236,200.00 Rp 39,366.67
Rp 252,950.00 Rp 46,374.17
Rp 262,900.00 Rp 32,862.50
Rp 258,700.00 Rp 47,428.33
Rp 134,250.00 Rp 72,718.75

Rp 98,400.00 Rp 1,968.00
Rp 160,000.00 Rp 13,333.33
Rp 108,281.25 Rp 7,218.75
Rp 348,700.00 Rp 29,058.33
Nilai HSPK : Rp 368,162.17

Rp 100,000.00 Rp 5,000.00
Rp 90,000.00 Rp 1,500.00
Rp 90,000.00 Rp 1,500.00
Rp 65,000.00 Rp 65,000.00

Rp 112,000.00 Rp 140,000.00

Rp 98,400.00 Rp 4,100.00
Rp 160,000.00 Rp 13,333.33
- 98 -

HARGA
HARGA
SATUAN
Rp 108,281.25 Rp 9,023.44
Nilai HSPK : Rp 239,456.77

Rp 100,000.00 Rp 3,750.00
Rp 90,000.00 Rp 1,125.00
Rp 65,000.00 Rp 80,437.50

Rp 139,850.00 Rp 156,632.00
Rp 181,200.00 Rp 45,300.00
Rp 134,250.00 Rp 50,343.75

Rp 98,400.00 Rp 4,920.00
Rp 167,850.00 Rp 10,490.63
Nilai HSPK : Rp 352,998.88

Rp 100,000.00 Rp 1,666.67
Rp 90,000.00 Rp 1,500.00
Rp 90,000.00 Rp 1,500.00
Rp 65,000.00 Rp 71,500.00

Rp 134,250.00 Rp 16,781.25
Rp 329,743.33 Rp 412,179.17

Rp 98,400.00 Rp 4,510.00
Rp 313,800.00 Rp 26,150.00
Rp 108,281.25 Rp 9,023.44
Nilai HSPK : Rp 544,810.52

Rp 100,000.00 Rp 2,222.22
Rp 90,000.00 Rp 8,000.00
Rp 90,000.00 Rp 8,000.00
- 99 -

HARGA
HARGA
SATUAN
Rp 65,000.00 Rp 17,333.33
Rp 70,000.00 Rp 12,444.44

Rp 1,374,874.59 Rp 3,055,276.87
Rp 302,000.00 Rp 4,026.67
Rp 13,800.00 Rp 55,200.00
Rp - Rp -

Rp 98,400.00 Rp 1,049.60
Rp 120,000.00 Rp 13,333.33
Rp 348,700.00 Rp 38,744.44
Rp 54,600.00 Rp 3,640.00
Rp 371,150.00 Rp 41,238.89
Rp 186,850.00 Rp 16,608.89
Nilai HSPK : Rp 3,277,118.70

Rp 100,000.00 Rp 41.67
Rp 90,000.00 Rp 75.00
Rp 90,000.00 Rp 75.00
Rp 65,000.00 Rp 270.83
Rp 67,500.00 Rp 56.25
Rp 70,000.00 Rp 58.33

Rp 302,000.00 Rp 5,410.83
Rp 13,800.00 Rp 16,675.00
Rp - Rp -

Rp 98,400.00 Rp 20.50
Rp 120,000.00 Rp 250.00
Rp 41,000.00 Rp 85.42
Rp 56,666.67 Rp 236.11
Nilai HSPK : Rp 23,254.94

Rp 100,000.00 Rp 111.11
- 100 -

HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 200.00
Rp 90,000.00 Rp 200.00
Rp 90,000.00 Rp 100.00
Rp 78,800.00 Rp 87.56
Rp 65,000.00 Rp 866.67
Rp 70,000.00 Rp 155.56

Rp 329,743.33 Rp 5,495.72
Rp 13,800.00 Rp 27,753.33
Rp - Rp -

Rp 98,400.00 Rp 52.48
Rp 120,000.00 Rp 1,333.33
Rp 41,000.00 Rp 455.56
Rp 56,666.67 Rp 629.63
Nilai HSPK : Rp 37,440.94

Rp 100,000.00 Rp 166.67
Rp 90,000.00 Rp 300.00
Rp 90,000.00 Rp 300.00
Rp 90,000.00 Rp 150.00
Rp 78,800.00 Rp 131.33
Rp 65,000.00 Rp 1,300.00
Rp 70,000.00 Rp 233.33

Rp 329,743.33 Rp 8,793.16
Rp 13,800.00 Rp 44,083.33
Rp - Rp -

Rp 98,400.00 Rp 78.72
Rp 120,000.00 Rp 1,333.33
Rp 41,000.00 Rp 455.56
Rp 56,666.67 Rp 629.63
Nilai HSPK : Rp 57,955.06
- 101 -

HARGA
HARGA
SATUAN
Rp 100,000.00 Rp 428.57
Rp 90,000.00 Rp 385.71
Rp 90,000.00 Rp 192.86
Rp 65,000.00 Rp 9,192.86
Rp 70,000.00 Rp 300.00

Rp 236,200.00 Rp 9,448.00
Rp 252,950.00 Rp 3,920.73
Rp 262,900.00 Rp 2,918.19
Rp 258,700.00 Rp 1,707.42
Rp 302,000.00 Rp 755.00
Rp 13,800.00 Rp 61,804.29
Rp - Rp -

Rp 98,400.00 Rp 569.31
Rp 120,000.00 Rp 1,285.71
Rp 41,000.00 Rp 439.29
Rp 46,666.67 Rp 500.00
Nilai HSPK : Rp 93,847.94

Rp 100,000.00 Rp 66.67
Rp 90,000.00 Rp 240.00
Rp 90,000.00 Rp 240.00
Rp 65,000.00 Rp 520.00
Rp 70,000.00 Rp 373.33

Rp 1,572,190.41 Rp 104,812.69
Rp 13,800.00 Rp 5,520.00
Rp - Rp -

Rp 98,400.00 Rp 31.49
Rp 389,150.00 Rp 1,297.17
Rp 348,700.00 Rp 1,162.33
Rp 41,000.00 Rp 136.67
Rp 371,150.00 Rp 1,237.17
Rp 186,850.00 Rp 498.27
- 102 -

HARGA
HARGA
SATUAN
Nilai HSPK : Rp 116,135.78

Rp 100,000.00 Rp 8,571.43
Rp 90,000.00 Rp 7,714.29
Rp 90,000.00 Rp 3,857.14
Rp 65,000.00 Rp 183,857.14
Rp 70,000.00 Rp 6,000.00

Rp 236,200.00 Rp 209,205.71
Rp 252,950.00 Rp 59,985.29
Rp 262,900.00 Rp 53,331.14
Rp 302,000.00 Rp 47,888.57
Rp 13,800.00 Rp 1,084,285.71

Rp 98,400.00 Rp 11,245.71
Rp 120,000.00 Rp 25,714.29
Rp 41,000.00 Rp 8,785.71
Rp 46,666.67 Rp 10,000.00
Nilai HSPK : Rp 1,720,442.14

Rp 100,000.00 Rp 111.11
Rp 90,000.00 Rp 500.00
Rp 90,000.00 Rp 500.00
Rp 65,000.00 Rp 1,083.33
Rp 70,000.00 Rp 777.78

Rp 302,000.00 Rp 302.00
Rp 13,800.00 Rp 5,520.00
Rp - Rp -
Rp 1,539,877.58 Rp 171,097.51

Rp 98,400.00 Rp 52.48
Rp 120,000.00 Rp 666.67
Rp 389,150.00 Rp 2,161.94
- 103 -

HARGA
HARGA
SATUAN
Rp 348,700.00 Rp 1,937.22
Rp 41,000.00 Rp 136.67
Rp 371,150.00 Rp 2,061.94
Rp 186,850.00 Rp 830.44
Nilai HSPK : Rp 187,739.10

Rp 100,000.00 Rp 1,720.00
Rp 90,000.00 Rp 6,183.00
Rp 65,000.00 Rp 8,970.00

Err:509 Err:509
Rp 10,500.00 Rp 44,297.40
Rp 25,200.00 Rp 12,600.00

Rp 46,666.67 Rp 5,632.67
Rp 98,400.00 Rp 49.20
Nilai HSPK : Err:509

Rp 100,000.00 Rp 5,000.00
Rp 65,000.00 Rp 97,500.00

Rp 115,500.00 Rp 15,592.50
Rp 86,650.00 Rp 4,332.50
Rp 98,400.00 Rp 2,952.00
Nilai HSPK : Rp 125,377.00
- 77 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

S Pertamanan
1 Penanaman Semak Hias m2
Tenaga:
Mandor 0.0100 O.H
Pekerja 0.3300 O.H
Bahan:
Semak Hias 1.0000m2
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
2 Menanam Rumput Jepang termasuk Perawatannya m2
Tenaga:
Mandor 0.0100 O.H
Pekerja 0.1500 O.H
Bahan:
Rumput Jepang 1.0000 m2
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
3 Penanaman Pohon Pucuk Merah Tinggi 1 m Batang
Tenaga:
Mandor 0.0200 O.H
Tukang Tanam 0.4000 O.H
Bahan:
Pucuk Merah tinggi 1 m 1.0000 Btg
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
4 Penanaman Taiwan Beauty Putih m1
Tenaga:
Mandor 0.0020 O.H
Tukang Tanam 0.0660 O.H
Bahan:
Taiwan Beauty Putih 10.0000 Btg
Jumlah
Overhead + Profit ( 10 % )
Nilai HSPK :
- 78 -

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 1,000.00
Rp 70,000.00 Rp 23,100.00

Rp 50,000.00 Rp 50,000.00
Jumlah Rp 74,100.00
Overhead + Profit ( 10 % ) Rp 7,410.00
Nilai HSPK : Rp 81,510.00

Rp 100,000.00 Rp 1,000.00
Rp 70,000.00 Rp 10,500.00

Rp 25,000.00 Rp 25,000.00
Jumlah Rp 36,500.00
Overhead + Profit ( 10 % ) Rp 3,650.00
Nilai HSPK : Rp 40,150.00

Rp 100,000.00 Rp 2,000.00
Rp 70,000.00 Rp 28,000.00

Rp 50,000.00 Rp 50,000.00
Jumlah Rp 80,000.00
Overhead + Profit ( 10 % ) Rp 8,000.00
Nilai HSPK : Rp 88,000.00

Rp 100,000.00 Rp 200.00
Rp 70,000.00 Rp 4,620.00

Rp 5,500.00 Rp 55,000.00
Jumlah Rp 59,820.00
Overhead + Profit ( 10 % ) Rp 5,982.00
Nilai HSPK : Rp 65,802.00
DAFTAR HARGA BAHAN KONSTRUKSI YANG DISURVEI
NO URAIAN KETERANGAN
1 Bata Merah
2 Batu Kali Batu Belah Pondasi ( 15/20)
3 Batu Split Pecah Mesin 1/2
4 Batu Split Pecah Mesin 2/3
5 Batu Split Pecah Mesin 3/5
6 Pasir Beton
7 Pasir Pasang
8 Pasir Urug
9 Tanah Urug
10 Tanah Tanam
11 Semen ( 50 Kg ) Gresik
12 Semen ( 50 Kg ) Holcim
13 Semen ( 40 Kg ) Gresik
14 Semen ( 40 Kg ) Holcim
15 Semen Warna
16 Besi Beton Polos
17 Besi Beon Ulir
18 Kawat Beton
19 Rangka Atap Baja Ringan Smart Truss
20 Rangka Atap Baja Ringan Kencana
21 Baja WF
22 Kanal C
23 Plat Siku
24 Plat Strip
25 Besi Hollow Galvalume 4 x 4 Panjang 6m
26 Besi Hollow Galvalume 2 x 4 Panjang 6m
27 Besi Hollow Galvalume 4 x 4 Panjang 4m
28 Besi Hollow Galvalume 2 x 4 Panjang 4m
29 Pipa Besi Hollow Kotak 3 x 3, panjang 6 m
30 Pipa Besi Hollow Kotak 2 x 4, panjang 6 m
31 Pipa Besi Hollow Kotak 4 x 4, panjang 6 m
32 Pipa Besi Hollow Kotak 5 x 5, panjang 6 m
33 Pipa Besi Hollow Kotak 6 x 6, panjang 6 m
34 Pipa Besi Hollow Kotak 7 x 7, panjang 6 m
35 Besi Wiremesh M6, Uk. 2,1 x 5,4 m
36 Baja Ringan Zincalum, C75 - 1mm
37 Baja Ringan Zincalum, C75 - 0.75mm
38 Baja Ringan Zincalum, Reng TS 40.048
39 Genteng Kodok Ex. Trenggalek
40 Genteng Kodok Ex. Karangpilang
41 Genteng Beton Ex. Cisangkan
42 Genteng Keramik
43 Genteng Glassur
44 Wuwungan Ex. Trenggalek
NO URAIAN KETERANGAN
45 Wuwungan Ex. Karangpilang
46 Wuwungan Ex. Cisangkan
47 Wuwungan Keramik
48 Wuwungan Glassur
49 Penutup AtapZincalum Tebal = 0,3 mm
50 Penutup AtapZincalum Tebal = 0,35 mm
51 Penutup AtapZincalum Tebal = 0,4 mm
52 Aluminum Karet Kusen Aluminium
53 Aluminum Profil 3" Coklat ( 3 x 7.5 )
54 Aluminum Profil 3" Putih ( 3 x 7.5 )
55 Aluminum Profil 4" Coklat ( 4 x 10 )
56 Aluminum Profil 4" Putih ( 4 x 10 )
57 Aluminum Slimar 3/8" Jendela
58 Allumunium Foil Bubble, Double Side Medium t = 4mm
59 Allumunium Foil Tape 48 mm x 45 m
60 Amplas Halus Feting 0 s/d 3
61 Amplas Kasar Fujistar 0 s/d 1000
62 Asbes Gel Besar Tbl 6 mm; 1.80x1.05 m
63 Asbes Gel Besar Tbl 4 mm ; 3 x 1.05 m
64 Asbes Gel Besar Tbl 5 mm ; 3 x 1.10 m
65 Asbes Gel Besar Tbl 6 mm; 2.10x1.05 m
66 Asbes Gel Besar Tbl 6 mm; 2.40x1.05 m
67 Asbes Gel Besar Tbl 6 mm; 2.70x1.05 m
68 Asbes Gel. Besar Tbl 6 mm ; 3 x 1.05 m
69 Asbes Gel Kecil Tbl 4 mm; 1.80x1.05 m
70 Asbes Gel Kecil Tbl 4 mm; 2.10x1.05 m
71 Asbes Gel Kecil Tbl 4 mm; 2.40x1.05 m
72 Asbes Gel Kecil Tbl 4 mm; 2.70x1.05 m
73 Asbes Gel Kecil Tbl 4 mm; 3.00x1.05 m
74 Asbes Gel Kecil Tbl 5 mm; 3.05x1.05 m
75 Asbes Datar uk. 100 x 100 x 0.3Cm
76 Asbes Gel. Besar Tbl 5 mm ; 2.5 x 1.10
77 Asbes Gel. Kecil Tbl 4 mm ; 1.5 x 1.05
78 Asbes Gel. Kecil Tbl 5 mm ; 1.8 x 0.92
79 Asbes Gel. Kecil Tbl 5 mm ; 2.00 x 0.92
80 Asbes Gel. Kecil Tbl 5 mm ; 2.25 x 0.92
81 Asbes Plat 90x 180x 0.03 cm
82 Asbes Sirap Uk. 20x3x400 cm
83 Asbes Nok Nok Asbes Gel. Besar
84 Asbes Nok Nok Asbes Gel. Kecil
85 Closet Jongkok
86 Closet Duduk ex. Toto Lengkap
87 Wastafel Ex. Toto
88 Urinoir Ex. Toto
89 Hand Shower
NO URAIAN KETERANGAN
90 Bak Cuci Piring
91 Tempat Sabun Duty
92 Granit 30 x 60
93 Granit 40 x 60
94 Granit 60 x 60
95 Keramik Motif 20 x 20 ( asia )
96 Keramik Motif 20 x 25 ( asia )
97 Keramik Motif 30 x 30 ( asia )
98 Keramik Motif 40 x 40 ( asia )
99 Keramik Polos 20 x 25 (mulia)
100 Keramik Polos 30 x 30 (asia)
101 Keramik Polos 40 x 40 (asia)
102 Keramik List motif / variasi
103 Keramik Kasar 40 x 40
104 Keramik Kasar 60 x 60
105 Lem Kayu, Rajawali
106 Lem PVC
107 sealent
108 Marmer Ex. Lampung 30 x 60 cm (A)
109 Marmer Ex. Lampung 30 x 60 cm (B)
110 Marmer Ex. Lampung 40 x 60 cm (A)
111 Marmer Ex. Tulungagung 30 x 60 cm
112 Marmer Ex. Tulungagung 40 x 60 cm
113 Marmer Plint
114 Kaca Polos Bening 8 mm
115 Kaca Polos Bening 10 mm
116 Kaca Polos Bening 12 mm
117 Kaca Polos Bening 20 mm
118 Kaca Polos Bening tebal 3mm
119 Kaca Polos Bening tebal 5mm
120 Kaca Rayben 12 mm
121 Kaca Rayben tebal 3mm
122 Kaca Rayben tebal 5mm
123 Kaca Kaca Es Tebal 5mm
124 Kaca Vertical Blind
125 Kaca Acrylic, bening uk. 5mm ( 122 x 244 cm )
126 Kaca Acrylic, bening uk. 10mm ( 122 x 244 cm )
127 Kaca Kaca Tempered Warna Tebal 8 mm
128 Kaca Kaca Tempered Warna Tebal 12 mm
129 Batu Batako Semen (40x 20x 10 cm)
130 Batu Candi Alur
131 Batu Gilang Ex Cirebon Acak
132 Batu Gilang Ex Cirebon Uk. 10 x 20
133 Batu Gilang Ex Jember Acak
134 Batu Gilang Ex Jember 20x40
NO URAIAN KETERANGAN
135 Batu Grass Block
136 Batu Looster, abu-abu (55x25) cm
137 Batu Looster, Merah (10x25) cm
138 Batu Palimanan Hijau
139 Batu Palimanan Kuning
140 Seng Gelombang BJLS 20 uk. (80 x 300 cm)
141 Seng Gelombang BJLS 28 uk. (80 x 180 cm)
142 Seng Gelombang BJLS 30 uk. (80 x 210 cm)
143 Seng Gelombang BJLS 30 uk. (80x 300cm)
144 Seng Gelombang BJLS 30 uk. (80x 180cm)
145 Seng Gelombang BJLS 40 uk. (80 cm x300 cm)
146 Seng Gelombang BJLS 40 uk. (80 cm x210 cm)
147 Seng Gelombang BJLS 40 uk (80 x 240 cm)
148 Seng Gelombang Nok Stel Gelombang Seng
149 Seng Gelombang Plat BJLS 30/30 cm
150 Seng Gelombang Plat BJLS 30/40 cm
151 Seng Gelombang Plat BJLS 30/80 cm
152 Seng Gelombang Plat uk (0,03x90x180)cm
153 Seng Gelombang Sambungan talang
154 Seng Gelombang Talang 60cm x 30 BJLS
155 Seng Gelombang Talang 60cm x 40 BJLS
156 Seng Gelombang Talang 90cm x 30 BJLS
157 Seng Gelombang Talang 90cm x 40 BJLS
158 Atap Spandek tebal 0,3
159 Atap Spandek tebal 0,35
160 Atap Spandek tebal 0,4
161 Atap Spandek tebal 0,45
162 Atap Spandek tebal 0,5
163 Buis Beton Bulat 100/100 cm
164 Buis Beton Bulat 15/100 cm
165 Buis Beton Bulat 20/100 cm
166 Buis Beton Bulat 30/100 cm
167 Buis Beton Bulat 40/100 cm
168 Buis Beton Bulat 50/100 cm
169 Buis Beton Bulat 50/50 cm
170 Buis Beton Bulat 60/100 cm
171 Buis Beton Bulat 60/50 cm
172 Buis Beton Bulat 80/100 cm
173 Buis Beton Bulat 80/50 cm
174 Buis Beton Bulat 100/50 cm
175 Buis Beton U 15 cm
176 Buis Beton U 20 cm
177 Buis Beton U 30 cm
178 Buis Beton U 40 cm
179 Buis Beton U 50 cm
NO URAIAN KETERANGAN
180 Paku Paku Asbes
181 Paku Paku Biasa/ keling/ Usuk/ Triplek/ Eternit/ Reng
182 Paku Paku Sekrup Besar
183 Paku Sekrup 1"
184 Pintu Kamar Mandi galvalum wto
185 Pintu Kamar Mandi Aluminium Uk.70 x 200cm
186 Pintu Kamar Mandi PVC polos uk. 197 x 70 cm
187 Sekrup 2"
188 Gypsum board Tebal 12 mm
189 Gypsum board Tebal 9 mm
190 Kalsiboard Uk. 244 x 122 x 3,5 mm
191 Kalsiboard Uk. 244 x 122 x 4,5 mm
192 Kalsiboard Uk. 244 x 122 x 6 mm
193 Kalsiboard Uk. 244 x 122 x 9 mm
194 Kalsiplank lbr = 20 cm
195 Kalsiplank lbr = 30 cm
196 Got Talang R.10 (1/2 lingkaran)
197 Got Talang R.10 (segmen)
198 Got Talang R.15 (1/2 lingkaran)
199 Got Talang R.15 (segmen)
200 Got Talang R.25 (1/2 lingkaran)
201 Got Talang R.25 (segmen)
202 Glass Bit
203 Tiang Pancang Persegi Uk. 30 cm x 30 cm x 6 m Beton K 500
204 HPL Type Metalic, Hairline, Uk. 1242mm x 2484 mm x 0,8 mm
205 HPL Type Metalic, Alumunium, Uk. 1242mm x 2484 mm x 0,8 mm
206 HPL Type Metalic, Bronze, Uk. 1242mm x 2484 mm x 0,8 mm
207 HPL Type Monochromatic, Light Grey,Uk. 1242mm x 2484 mm x 0,8 mm
208 Lem HPL 9,5 Kg
209 Alucopan Goldstar
210 Alucopan Alustar
211 Alucopan New Alucopan
212 Alucopan Luminate
213 Alucopan Alucobond
214 Roof Tank Kap. 2m3
215 Tandon Air Stainless + Fiber
216 Engsel Akses
217 Engsel Dior 3 kuning
218 Engsel Dior 4 kuning
219 Engsel Dior 5 kuning
220 Engsel Engsel Dorong / Railing Pintu Merk Handerson
221 Engsel Gomeo 4 dim Kuningan
222 Engsel Hidrolis Pintu aluminium
223 Engsel Hings, 5 dim Kuningan Jendela
224 Engsel Jendela Kuningan
NO URAIAN KETERANGAN
225 Engsel kuningan 3" (Pintu Kayu)
226 Engsel muller kuning 5" (Pintu Alm.)
227 Engsel salon HK 20
228 Engsel salon HK 25
229 Engsel Salon HK 30
230 Engsel Solid EK 17
231 Gembok Hitam Cooper 75 mm
232 Grendel Engsel Kuningan
233 Grendel Grendel Biasa (Besar)
234 Grendel Grendel Biasa (Kecil)
235 Grendel Grendel Panjang
236 Grendel Grendel Tanam
237 Grendel Kuningan / crom (kuning)
238 Kran air goldeno /yuri 1/2"
239 Kran Plastik 1/2"
240 Kran Putar Untuk Tanaman 3/4"
241 Kran Bebek, SKM 10 JC
242 Kran Bebek, Sobar 10 JC
243 Kran Bebek, Fio 10 JC
244 Kunci Kuda Terbang 2x Putar
245 Kunci Kunci Tanam Aluminium
246 Kunci Kunci Tanam Biasa
247 Kunci Kunci Tanam Kamar Mandi
248 Handle Solid HRE 6141
249 Hak Angin Biasa
250 Hak Angin Kuningan
251 Kait Angin
252 Hak Angin Lurus Kuningan
253 Door Holder
254 Door Kloser
255 Door Stop
256 Rel Pintu Dorong
257 Penyangga Jendela Biasa
258 Rel Pintu Dorong Uk. 90
259 Kabel NYA Supreme, 2 x 2,5 mm
260 Kabel NYA Supreme, 1 x 2.5 mm
261 Kabel NYM Supreme 2 x 1.5 mm
262 Kabel NYM Supreme, 2 x 2.5 mm
263 Kabel NYY Supreme, 2 X 4 mm
264 Kabel NYY Supreme, 4 X 2,5 mm
265 Kabel NYY Supreme, 4 X 10 mm
266 Kabel Tray Lebar 100 x Tinggi 50 x Panjang 2400 x Ketebalan Plat 1,2 mm
267 Kabel Tray 150 x 50 x 2400 x 1,2 mm
268 Kabel Tray 200 x 50 x 2400 x 1,2 mm
269 Kabel Tray 300 x 50 x 2400 x 1,2 mm
NO URAIAN KETERANGAN
270 Kabel Tray 400 x 50 x 2400 x 1,2 mm
271 Kabel Tray 500 x 50 x 2400 x 1,2 mm
272 Kabel Tray 150 x 100 x 2400 x 1,2 mm
273 Kabel Tray 200 x 100 x 2400 x 1,2 mm
274 Kabel Tray 300 x 100 x 2400 x 1,2 mm
275 Kabel Tray 400 x 100 x 2400 x 1,2 mm
276 Kabel Tray 500 x 100 x 2400 x 1,2 mm
277 Lampu TL Philips, 18 watt
278 Lampu TL Philips, 20 Watt + Kap
279 Lampu TL Philips, 40 Watt + Kap
280 Lampu Essential Philips, 18 watt
281 Lampu Essential Philips, 23 watt
282 Lampu RM 2 x 36 Watt, Fatro
283 Lampu RM 2 x 18 Watt, Fatro
284 Lampu Baret 32 Watt
285 Lampu RM 2 x 36 Watt, Artolite
286 Lampu RM 2 x 18 Watt, Artolite
287 Lampu Downlight SM D 150 E27 PL ESS 18W, Artolite
288 Lampu Downlight RD 150 E27 SAVY PL ESS 18W, Artolite
289 Stop Kontak Broco, 2 Port
290 Saklar Broco, Ganda
291 Saklar Broco, Engkel IB
292 Fitting Plafon
293 MCB 10A, 3 Phase Schneider
294 Pipa PVC buta dia = 12" klas VP AWS 10
295 Pipa PVC buta dia = 6" klas VP AWS 10
296 Pipa PVC Maspion AW 1 1/2" X 6 m
297 Pipa PVC Maspion AW 1 1/4" X 6 m
298 Pipa PVC Maspion AW 1" X 4 m
299 Pipa PVC Maspion AW 1" X 6 m
300 Pipa PVC Maspion AW 1 1/4" X 4 m
301 Pipa PVC Maspion AW 1 1/2" X 4 m
302 Pipa PVC Maspion AW 1/2" X 4 m
303 Pipa PVC Maspion AW 1/2" X 6 m
304 Pipa PVC Maspion AW 10" X 4 m
305 Pipa PVC Maspion AW 10" X 6 m
306 Pipa PVC Maspion AW 12" X 4 m
307 Pipa PVC Maspion AW 12" X 6 m
308 Pipa PVC Maspion AW 14" X 4 m
309 Pipa PVC Maspion AW 14" X 6 m
310 Pipa PVC Maspion AW 16" X 4 m
311 Pipa PVC Maspion AW 16" X 6 m
312 Pipa PVC Maspion AW 2 1/2" X 6 m
313 Pipa PVC Maspion AW 2" X 4 m
314 Pipa PVC Maspion AW 2" X 6 m
NO URAIAN KETERANGAN
315 Pipa PVC Maspion AW 2 1/2" X 4 m
316 Pipa PVC Maspion AW 3" X 4 m
317 Pipa PVC Maspion AW 3" X 6 m
318 Pipa PVC Maspion AW 3/4" X 4 m
319 Pipa PVC Maspion AW 3/4" X 6 m
320 Pipa PVC Maspion AW 4" X 4 m
321 Pipa PVC Maspion AW 4" X 6 m
322 Pipa PVC Maspion AW 5" X 4 m
323 Pipa PVC Maspion AW 5" X 6 m
324 Pipa PVC Maspion AW 6" X 4 m
325 Pipa PVC Maspion AW 6" X 6 m
326 Pipa PVC Maspion AW 8" x 4 m
327 Pipa PVC Maspion AW 8" X 6 m
328 Pipa PVC Maspion C 1 1/2" X 4 m
329 Pipa PVC Maspion C 1 1/2" X 6 m
330 Pipa PVC Maspion C 1 1/4" X 4 m
331 Pipa PVC Maspion C 1 1/4" X 6 m
332 Pipa PVC Maspion C 1" X 4 m
333 Pipa PVC Maspion C 1" X 6 m
334 Pipa PVC Maspion C 2 1/2" X 4 m
335 Pipa PVC Maspion C 2 1/2" X 6 m
336 Pipa PVC Maspion C 2" X 4 m
337 Pipa PVC Maspion C 2" X 6 m
338 Pipa PVC Maspion C 3" X 4 m
339 Pipa PVC Maspion C 3" X 6 m
340 Pipa PVC Maspion C 3/4" X 4 m
341 Pipa PVC Maspion C 3/4" X 6 m
342 Pipa PVC Maspion C 4" X 4 m
343 Pipa PVC Maspion C 4" X 6 m
344 Pipa PVC Maspion C 5/8" X 4 m
345 Pipa PVC Maspion C 5/8" X 6 m
346 Pipa PVC Maspion D 2 1/2" X 6 m
347 Pipa PVC Maspion D 1 1/2" X 6 m
348 Pipa PVC Maspion D 1 1/4" X 6 m
349 Pipa PVC Maspion D 1 1/4" X 4 m
350 Pipa PVC Maspion D 1 1/2" X 4 m
351 Pipa PVC Maspion D 10" X 4 m
352 Pipa PVC Maspion D 10" X 6 m
353 Pipa PVC Maspion D 12" X 4 m
354 Pipa PVC Maspion D 12" X 6 m
355 Pipa PVC Maspion D 14" x 4 m
356 Pipa PVC Maspion D 14" X 6 m
357 Pipa PVC Maspion D 16" x 4 m
358 Pipa PVC Maspion D 16" X 6 m
359 Pipa PVC Maspion D 2" X 4 m
NO URAIAN KETERANGAN
360 Pipa PVC Maspion D 2" X 6 m
361 Pipa PVC Maspion D 2 1/2" X 4 m
362 Pipa PVC Maspion D 20" x 4 m
363 Pipa PVC Maspion D 20" X 6 m
364 Pipa PVC Maspion D 3" X 4 m
365 Pipa PVC Maspion D 3" X 6 m
366 Pipa PVC Maspion D 4" X 4 m
367 Pipa PVC Maspion D 4" X 6 m
368 Pipa PVC Maspion D 5" X 4 m
369 Pipa PVC Maspion D 5" X 6 m
370 Pipa PVC Maspion D 6" X 4 m
371 Pipa PVC Maspion D 6" X 6 m
372 Pipa PVC Maspion D 8" X 4 m
373 Pipa PVC Maspion D 8" X 6 m
374 Pipa PVC Dia 1" S-12,5 @ 6m
375 Pipa PVC Dia 1 1/2" S-12,5 @ 6m
376 Pipa PVC Dia 10" S-12,5 @ 6m AW
377 Pipa PVC Dia 2" S-12,5 @ 6m
378 Pipa PVC Dia 2 1/2" S-12,5 @ 6m
379 Pipa PVC Dia 3" S-12,5 @ 6m
380 Pipa PVC Dia 3/4" S-12,5 @ 6m
381 Pipa PVC Dia 4" S-12,5 @ 6m
382 Pipa PVC Dia 6" S-12,5 @ 6m
383 Pipa PVC Dia 8" S-12,5 @ 6m AW
384 Pipa PVC screen dia = 6" klas VP AWS 10
385 Pipa Galvanis Dia 2 - 1/2" @ 6m Kelas B
386 Pipa Galvanis Dia 3" @ 6m Kelas B
387 Pipa Galvanis Dia 4" @ 6m Kelas B
388 Pipa Galvanis Dia 5" @ 6m Kelas B
389 Pipa Galvanis Dia 6" @ 6m Kelas B
390 Pipa Galvanis Dia 1/2" @ 6m Kelas A
391 Pipa Galvanis Dia 3/4" @ 6m Kelas A
392 Pipa Galvanis Dia 1" @ 6m Kelas A
393 Pipa Galvanis Dia 1 - 1/4" @ 6m Kelas A
394 Pipa Galvanis Dia 1 - 1/2" @ 6m Kelas A
395 Pipa Galvanis Dia 2" @ 6m Kelas A
396 Pipa Galvanis Dia 2 - 1/2" @ 6m Kelas A
397 Pipa Galvanis Dia 3" @ 6m Kelas A
398 Pipa Galvanis Dia 4" @ 6m Kelas A
399 Pipa Galvanis Dia 5" @ 6m Kelas A
400 Pipa Galvanis Dia 6" @ 6m Kelas A
401 Pipa Galvanis Dia 8" @ 6m Kelas A
402 Pipa Galvanis Dia 1/2" @ 6m Medium B
403 Pipa Galvanis Dia 3/4" @ 6m Medium B
404 Pipa Galvanis Dia 1" @ 6m Medium B
NO URAIAN KETERANGAN
405 Pipa Galvanis Dia 1 - 1/4" @ 6m Medium B
406 Pipa Galvanis Dia 1 - 1/2" @ 6m Medium B
407 Pipa Galvanis Dia 2" @ 6m Medium B
408 Pipa Galvanis Dia 2 - 1/2" @ 6m Medium B
409 Pipa Galvanis Dia 3" @ 6m Medium B
410 Pipa Galvanis Dia 4" @ 6m Medium B
411 Pipa Galvanis Dia 5" @ 6m Medium B
412 Pipa Galvanis Dia 6" @ 6m Medium B
413 Pipa Galvanis Dia 1/2" @ 6m Medium A
414 Pipa Galvanis Dia 3/4" @ 6m Medium A
415 Pipa Galvanis Dia 1" @ 6m Medium A
416 Pipa Galvanis Dia 1 - 1/4" @ 6m Medium A
417 Pipa Galvanis Dia 1 - 1/2" @ 6m Medium A
418 Pipa Galvanis Dia 2" @ 6m Medium A
419 Pipa Galvanis Dia 2 - 1/2" @ 6m Medium A
420 Pipa Galvanis Dia 3" @ 6m Medium A
421 Pipa Galvanis Dia 4" @ 6m Medium A
422 Pipa Galvanis Dia 5" @ 6m Medium A
423 Pipa Galvanis Dia 6" @ 6m Medium A
424 Pipa Galvanis Dia 8" @ 6m Medium A
425 Pipa Stainless Dia 5/8" @ 6m (heinse Merah)
426 Pipa Stainless Dia 1 1/4" @ 6m (heinse Merah)
427 Pipa Stainless Dia 1 1/2" @ 6m (heinse Merah)
428 Pipa Stainless Dia 2" @ 6m (heinse Merah)
429 Reducer PVC All Flange Dia 12" x 6"
430 Tee Maspion, TS 1"
431 L. Joint PVC dia. 6"
432 L. Joint PVC dia. 4"
433 Las Boch GIP dia. 3"
434 T Joint PVC dia. 6"
435 T Joint PVC dia. 4"
436 T Joint GIP dia. 3"
437 Flens Adaptor PVC dia. 6"
438 Flens Adaptor PVC dia. 4"
439 Flens Adaptor GIP dia. 3"
440 Flens Adaptor GIP dia. 4"
441 Reducer PVC 4" - 6"
442 Reducer GIP 3" - 4"
443 Alva Valve dia. 6"
444 Gate Valve 3"
445 Buis Beton 100/50 cm
446 Air Valve Single dia. 2"
447 Clamp Sadle dia 4"
448 Bambu Bongkotan Dia 12 cm x 6 m
449 Kayu Bekesting (meranti)
NO URAIAN KETERANGAN
450 Kayu Glugu / pohon kelapa
451 Kayu Jati Balok 6 x 12 x 400cm
452 Kayu Jati Balok 8 x 12 x 400cm
453 Kayu Jati Kaso 3 x 5 x 400cm
454 Kayu Jati Kaso 4 x 6 x 400cm
455 Kayu Jati Kaso 5 x 7 x 400cm
456 Kayu Jati Papan 2 x 20 x 400cm
457 Kayu Jati Reng 2 x 3 x 400cm
458 Kayu Jati Reng 3 x 5 x 400cm
459 Kayu Kamper Balok 6 x 12 x 400cm
460 Kayu Kamper Kaso 5 x 7 x 400cm
461 Kayu Kamper Papan 2 x 20 x 400cm
462 Kayu Kamper Reng 2 x 3 x 400cm
463 Kayu Kotak adukan
464 Kayu Kruing Balok 6 x 12 x 400cm
465 Kayu Kruing Kaso 5 x 7 x 400cm
466 Kayu Kruing Papan 2 x 20 x 400cm
467 Kayu Kruing Reng 2 x 3 x 400cm
468 Kayu Meranti Balok 6 x 12 x 400Cm
469 Kayu Meranti Kaso 5 x 7 x 400Cm
470 Kayu Meranti Papan 2 x 20 x 400Cm
471 Kayu Meranti Reng 2 x 3 x 400Cm
472 Kayu Multipleks (0,9 x 122 x 244)cm
473 Kayu Multipleks (1,2 x 122 x 244) cm
474 Kayu Perancah
475 Kayu Plywood 122x244x4 mm
476 Kayu Plywood 122x244x6 mm
477 Kayu Plywood 122x244x8 mm
478 Kayu Teakwood 90.210.4 mm
479 Kayu Teakwood (0,4 x 110 x 210) cm
480 Kayu Teakwood (0,4 x 122 x 244) cm
481 Kayu Tripleks (0,3 x 122 x 244)cm
482 Kayu Tripleks (0,4 x 122 x 244)cm
483 Kayu Tripleks (0,6 x 122 x 244)cm
484 Kayu Tripleks (0,3 x 90 x 210) cm + Aluminium
485 Waterproofing No Drop, 1 Kg
486 Waterproofing No Drop, 4 Kg
487 Waterproofing No Drop, 20 Kg
488 Waterproofing Multiguard, 1 Kg
489 Cat Genteng, Sanlek
490 Cat Kayu / Emco
491 Cat Besi/emco
492 Cat Meni Besi, Pedang
493 Cat Minyak Cat, Avian
494 Cat Minyak Cat, Biasa
NO URAIAN KETERANGAN
495 Cat Plamur Kayu, Cap Pedang
496 Cat Politur jadi
497 Cat Shanding
498 Cat Teer
499 Cat Catylac
500 Cat Tembok Decholite (5 Kg)
501 Cat Tembok Interior Dulux Khusus
502 Cat Tembok Interior Dulux standar
503 Cat Tembok, Paragon
504 Cat Tembok, Paragon (5 Kg)
505 Cat Thinner A Special
506 Cat Thinner B
507 Cat Wood Filler
508 Cat Tembok Eksterior Dulux ( Standar )
509 Cat Tembok Eksterior Dulux ( Khusus )
510 Cat Tembok Dasar Alkali, Interior Dulux
511 Cat Jotun Eksterior Jotashield
NO URAIAN KETERANGAN
NO URAIAN KETERANGAN
1 Paving conblock ( Bata ) Abu. Uk. 21 x 10.5 x 6 cm ex. Focon
2 Paving conblock ( Bata ) Abu. Uk. 21 x 10.5 x 8 cm ex. Focon
3 Paving conblock ( Bata ) Warna. Uk. 21 x 10.5 x 6 cm ex. Focon ( Merah, Hijau, Hitam, Kuning )
4 Paving conblock ( Bata ) Warna. Uk. 21 x 10.5 x 8 cm ex. Focon ( Merah, Hijau, Hitam, Kuning )
5 Paving conblock ( Corso ) Abu. Uk. 21 x 21 x 6 cm ex. Focon
6 Paving conblock ( Corso ) Abu. Uk. 21 x 21 x 8 cm ex. Focon
7 Paving conblock ( Corso ) Warna. Uk. 21 x 21 x 6 cm ex. Focon ( Merah, Hijau, Hitam, Kuning )
8 Paving conblock ( Corso ) Warna. Uk. 21 x 21 x 8 cm ex. Focon ( Merah, Hijau, Hitam, Kuning )
9 Paving conblock ( Corso 31 ) Abu. Uk. 31.5 x 31.5 x 6 cm ex. Focon
10 Paving Conblock ( Hexagonal ) Abu. Uk. 12 x 12 x 6 cm ex. Focon
11 Kansetin 10.20.40 uk. 10 x 40 x 20 cm ex. Focon
12 Kantein 15.30.50 uk. 15 x 50 x 30 cm ex. Focon
13 Grass Block uk. 21.5 x 42 cm, Tebal 10 ex. Focon
14 Panel Beton Fence 180.55.5 ex. Focon
15 Panel Beton Fence 240.40.5 ex. Focon
16 Panel Beton Fence 240.50.5 ex. Focon
17 Kolom 300 Precast 300 x 16 x 15 cm ex. Focon
18 Kolom 325 Precast 325 x 16 x 15 cm ex. Focon
19 Kolom 350 Precast 350 x 16 x 15 cm ex. Focon
20 Kolom 375 Precast 375 x 16 x 15 cm ex. Focon
21 Kolom 420 Precast 420 x 16 x 20 cm ex. Focon
22 Kolom 420 Precast 420 x 20 x 20 cm ex. Focon
23 Kolom 500 Precast 500 x 16 x 20 cm ex. Focon
24 Topi Uskup Besar 20.35 x 29.7 cm Tebal 6 cm ex. Focon
25 Topi Uskup Besar 20.35 x 29.7 cm Tebal 8 cm ex. Focon
26 Topi Uskup Kecil 10.4 x 14.7 cm Tebal 6 cm ex. Focon
27 Topi Uskup Kecil 10.4 x 14.7 cm Tebal 8 cm ex. Focon
28 Paving conblock ( Bata ) Abu. Uk. 21 x 10.5 x 6 cm ex. Calvary
29 Paving conblock ( Bata ) Abu. Uk. 21 x 10.5 x 8 cm ex. Calvary
30 Paving conblock ( Bata ) Warna. Uk. 21 x 10.5 x 6 cm ex. Calvary ( Merah, Hijau, Hitam, Kuning )
31 Paving conblock ( Bata ) Warna. Uk. 21 x 10.5 x 8 cm ex. Calvary ( Merah, Hijau, Hitam, Kuning )
32 Paving conblock ( Corso ) Abu. Uk. 21 x 21 x 6 cm ex. Calvary
33 Paving conblock ( Corso ) Abu. Uk. 21 x 21 x 8 cm ex. Calvary
34 Paving conblock ( Corso ) Warna. Uk. 21 x 21 x 6 cm ex. Calvary ( Merah, Hijau, Hitam, Kuning )
35 Paving conblock ( Corso ) Warna. Uk. 21 x 21 x 8 cm ex. Calvary ( Merah, Hijau, Hitam, Kuning )
36 Paving conblock ( Corso 31 ) Abu. Uk. 31.5 x 31.5 x 6 cm ex. Calvary
37 Paving Conblock ( Hexagonal ) Abu. Uk. 12 x 12 x 6 cm ex. Calvary
38 Kansetin 10.20.40 uk. 10 x 40 x 20 cm ex. Calvary
39 Kantein 15.30.50 uk. 15 x 50 x 30 cm ex. Calvary
40 Grass Block uk. 21.5 x 42 cm, Tebal 10 ex. Calvary
41 Panel Beton Fence 180.55.5 ex. Calvary
42 Panel Beton Fence 240.40.5 ex. Calvary
43 Panel Beton Fence 240.50.5 ex. Calvary
44 Kolom 300 Precast 300 x 16 x 15 cm ex. Calvary
NO URAIAN KETERANGAN
45 Kolom 325 Precast 325 x 16 x 15 cm ex. Calvary
46 Kolom 350 Precast 350 x 16 x 15 cm ex. Calvary
47 Kolom 375 Precast 375 x 16 x 15 cm ex. Calvary
48 Kolom 420 Precast 420 x 16 x 20 cm ex. Calvary
49 Kolom 420 Precast 420 x 20 x 20 cm ex. Calvary
50 Kolom 500 Precast 500 x 16 x 20 cm ex. Calvary
51 Topi Uskup Besar 20.35 x 29.7 cm Tebal 6 cm ex. Calvary
52 Topi Uskup Besar 20.35 x 29.7 cm Tebal 8 cm ex. Calvary
53 Topi Uskup Kecil 10.4 x 14.7 cm Tebal 6 cm ex. Calvary
54 Topi Uskup Kecil 10.4 x 14.7 cm Tebal 8 cm ex. Calvary
55 Paving conblock ( Bata ) Abu. Uk. 21 x 10.5 x 6 cm ex. Conblock
56 Paving conblock ( Bata ) Abu. Uk. 21 x 10.5 x 8 cm ex. Conblock
57 Paving conblock ( Bata ) Warna. Uk. 21 x 10.5 x 6 cm ex. Conblock ( Merah, Hijau, Hitam, Kuning )
58 Paving conblock ( Bata ) Warna. Uk. 21 x 10.5 x 8 cm ex. Conblock ( Merah, Hijau, Hitam, Kuning )
59 Paving conblock ( Corso ) Abu. Uk. 21 x 21 x 6 cm ex. Conblock
60 Paving conblock ( Corso ) Abu. Uk. 21 x 21 x 8 cm ex. Conblock
61 Paving conblock ( Corso ) Warna. Uk. 21 x 21 x 6 cm ex. Conblock ( Merah, Hijau, Hitam, Kuning )
62 Paving conblock ( Corso ) Warna. Uk. 21 x 21 x 8 cm ex. Conblock ( Merah, Hijau, Hitam, Kuning )
63 Paving conblock ( Corso 31 ) Abu. Uk. 31.5 x 31.5 x 6 cm ex. Conblock
64 Paving Conblock ( Hexagonal ) Abu. Uk. 12 x 12 x 6 cm ex. Conblock
65 Kansetin 10.20.40 uk. 10 x 40 x 20 cm ex. Conblock
66 Kantein 15.30.50 uk. 15 x 50 x 30 cm ex. Conblock
67 Grass Block uk. 21.5 x 42 cm, Tebal 10 ex. Conblock
68 Panel Beton Fence 180.55.5 ex. Conblock
69 Panel Beton Fence 240.40.5 ex. Conblock
70 Panel Beton Fence 240.50.5 ex. Conblock
71 Kolom 300 Precast 300 x 16 x 15 cm ex. Conblock
72 Kolom 325 Precast 325 x 16 x 15 cm ex. Conblock
73 Kolom 350 Precast 350 x 16 x 15 cm ex. Conblock
74 Kolom 375 Precast 375 x 16 x 15 cm ex. Conblock
75 Kolom 420 Precast 420 x 16 x 20 cm ex. Conblock
76 Kolom 420 Precast 420 x 20 x 20 cm ex. Conblock
77 Kolom 500 Precast 500 x 16 x 20 cm ex. Conblock
78 Topi Uskup Besar 20.35 x 29.7 cm Tebal 6 cm ex. Conblock
79 Topi Uskup Besar 20.35 x 29.7 cm Tebal 8 cm ex. Conblock
80 Topi Uskup Kecil 10.4 x 14.7 cm Tebal 6 cm ex. Conblock
81 Topi Uskup Kecil 10.4 x 14.7 cm Tebal 8 cm ex. Conblock
82 Paving Stone ( Lokal ) Tebal 6cm Kw 1,abu-abu
83 Paving Stone ( Lokal ) Tebal 8cm Kw 1, abu-abu
84 Grass Block ( Lokal ) Tebal 6
85 Kanstin ( Lokal ) Uk. 40 x18 x 10 cm
86 Kanstin ( Lokal ) Uk. 50 x 35 x 15 cm
NO URAIAN KETERANGAN
NO URAIAN KETERANGAN
NO URAIAN KETERANGAN

Paving conblock Abu. Uk. 21 x 10.5 x 6 cm ex. Conblock


Paving conblock Abu. Uk. 21 x 10.5 x 8 cm ex. Conblock
Paving conblock Warna. Uk. 21 x 10.5 x 6 cm ex. Conblock
Paving conblock Warna. Uk. 21 x 10.5 x 8 cm ex. Conblock
Paving conblock Abu. Uk. 21 x 10.5 x 6 cm ex. Calvary
Paving conblock Abu. Uk. 21 x 10.5 x 8 cm ex. Calvary
Paving conblock Warna. Uk. 21 x 10.5 x 6 cm ex. Calvary
Paving conblock Warna. Uk. 21 x 10.5 x 8 cm ex. Calvary
Topi Uskup Tebal 6 cm ex. Conblock
Topi Uskup Tebal 8 cm ex. Conblock
Topi Uskup Tebal 6 cm ex. Calvary
Topi Uskup Tebal 8 cm ex. Calvary
Paving Stone Tebal 6cm Kw 1,abu-abu
Paving Stone Tebal 8cm Kw 1, abu-abu
Grass Block Tebal 6
Kanstin Uk. 40 x18 x 10 cm
Kanstin Uk. 50 x 35 x 15 cm
NO URAIAN KETERANGAN
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
buah
m3
m3
m3
m3
m3
m3
m3
m3
m3
Zak
Zak
Zak
Zak
Kg
Kg
Kg
Kg
m2
m2
Kg
Kg
Kg
Kg
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Lembar
m2
m2
m2
Biji
Biji
Biji
Biji
Biji
Biji
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Biji
Biji
Biji
Biji
m2
m2
m2
m1
m1
m1
m1
m1
m1
lembar
roll
Buah
Buah
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Buah
Lembar
Lembar
Lembar
Buah
Buah
Buah
Buah
Buah
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Buah
Buah
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m2
m2
Kg
Kg
Botol
m2
m2
m2
m2
m2
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
buah
buah
m2
m2
Buah
m2
m2
m2
m2
m2
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Buah
Biji
Biji
m2
m2
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Stel
m1
m1
m1
Lembar
Buah
m1
m1
m1
m1
meter
meter
meter
meter
meter
Biji
Biji
Biji
Biji
Biji
biji
Biji
Biji
Biji
Biji
Biji
Biji
Biji
Biji
Biji
Biji
Biji
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
kg
kg
buah
buah
Set
Set
Set
buah
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Buah
Buah
Buah
Buah
Buah
Buah
Kg
Batang
Buah
Buah
Buah
Buah
Botol
m2
m2
m2
m2
m2
Buah
Buah

Set
Set
Set
Set
Pasang
Set
Pasang
Set
Pasang
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )

Kotak
Kotak
Kotak
Kotak
Pasang
Pasang
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Pasang
set
set
set
Set
Set
Set
Set
Set
Buah
Buah
m
m
m
m
m
m
m
Roll
Roll
Roll
Roll
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Buah
Unit
Unit
Buah
Buah
Unit
Unit
Unti
Unit
Unit
Unit
Unit
Unit
Buah
Buah
Buah
Buah
m'
m'
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
m'
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah

Batang
m3
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )

Batang
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Buah
m3
m3
m3
m3
m3
m3
m3
m3
Lembar
Lembar
m3
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Kaleng
Kaleng
Kaleng
Kaleng

Galon
Kg
Kg
Kg
Liter
Liter
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )

Kg
Liter
Kg
Kg
5Kg
Galon
Liter
Liter
Kg
Galon
Liter
Liter
Kg
Liter
Liter
Liter
Kg

………………………….., 2018
Toko/UD

…………………………………….

…………………………………….
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m2
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m2
m1
m1
m1
m1
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
m1
m1
m1
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m2
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m2
m2
m2
m2
m2
m2
Buah
bh
bh
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
Buah
bh
bh
SATUAN HARGA ( ZONA 1 ) HARGA ( ZONA 2 )
Provinsi Jawa Timur
Kota/Kabupaten Kabupaten Madiun
Tahun 2015
Nomor SK. Simb/12/12/2013
Ditetapkan oleh Walikota Bandung
Nama Ridwan Kamil
Ditetapkan di Bandung
Tanggal 29 April 2013

NO URAIAN KETERANGAN SATUAN

I BATA, BATU DAN PASIR


1 Bata Merah uk. 5 x 11x 22 cm bh
2 Bata beton ringan ex Celcon uk. 9 x 19 x 39 cm bh
3 Batu kali Batu belah pondasi m3
4 Batu Split Pecah Mesin 1/2 m3
5 Batu Split Pecah Mesin 3/5 m3
6 Batu Kerikil m3
7 Pasir Beton m3
8 Pasir Pasang m3
9 Pasir Urug m3
10 Tanah Urug m3

II BAHAN PEREKAT
1 Semen (50 Kg) Semen Indonesia zak
2 Semen Warna Semen Indonesia kg

III BAHAN BAJA :


1 Besi Beton U-24 KS Kg
2 Besi Beton U-39 KS kg
3 Besi Plat rata2 KS Kg
4 Besi Tempa m2
5 Rangka atap baja ringan Smart truss; Prima truss m2
6 Kawat beton Kawat Beton kg

IV BAHAN KAYU
1 Kayu Klas I Jat m3
2 Kayu Klas II Kamper m3
3 Kayu Klas III Merant m3
4 Kayu Klas IV Terentang m3
5 Dolken dia 8 s/d 10 cm p. 4 m btg

V BAHAN ALMUNIUM
1 Kusen Almunium 3", Alexindo m'
2 Rangka Jendela Almunium Alexindo m'
3 Rangka Pintu Almunium Alexindo m'
4 Kusen & Pintu PVC toilet Maspion unt
5 Engsel 3", ex Bos bh
7 Handle pintu type HRE 75.01 ex. Cisa bh

115 dari 558


NO URAIAN KETERANGAN SATUAN
8 Selinder type 08510 ex. Cisa bh
9 Door Stoper bh
10 Door closer bh
11 Slot Tanam bh
12 Kait Angin bh
13 Grendel bh

VI BAHAN PELAPIS :
1 Triplek t. 3 mm Uk 120x240 cm lbr
2 Triplex t. 4 mm Uk 120x240 cm lbr
3 Triplex t. 9 mm Uk 120x240 cm lbr

VII BAHAN LANTAI & DINDING KERAMIK


1 Keramik 30/30 ex Masterina m2
2 Granite Tile 40/40 ex Granito tle m2
3 Plint Keramik 10/30 cm ex. Roman bh
4 Plint Granitetle 10/40 cm ex. Granito bh

VIII BAHAN PENUTUP ATAP


1 Genteng Keramik 25 bh/m2 ex Jatwangi bh
2 Genteng Keramik Glazur 15 bh/m2 KANMURI bh
3 Nok Genteng Keramik 4 bh/m ex Jatwangi bh
4 Nok Genteng Keramik Glasur 4 bh/m ex KANMURI bh
5 Seng Plat BJLS 30 L. 90 cm m'

IX BAHAN KACA :
1 Kaca Polos 3 mm m2
2 Kaca Polos 5 mm m2
3 Kaca Polos 8 mm m2

X BAHAN PAKU DAN MUR BAUT :


1 Paku 1 s/d 3 cm kg
2 Paku 5 s/d 10 cm kg
3 Paku 8 s/d 12 cm kg
4 Paku Skrup bh

XI BAHAN FINISHING :
1 Cat kayu/Besi ex. SEIV Kg
2 Plamir Kayu Kg
3 Meni kayu ex. Nippon kg
4 Wood Filler Impra Kg
5 Thinner ND IMPALA Ltr
6 Amplas Kayu Lbr
7 Kwas cat bh
8 Cat Tembok kw1 ex. Dulux ; Warna standard Kg
9 Cat Tembok kw2 ex. Vinilex ; Warna standard Kg
10 Plamir Tembok Kg

116 dari 558


NO URAIAN KETERANGAN SATUAN
11 Lem Kayu kg
12 Seal tape bh
13 Minyak bekistng Ltr

XII BAHAN SANITARI


1 Wastafel LW 240 CJ ex Toto, Komplit kran & acc unt
2 Kloset duduk CW 600 J / SW 660 J Komplit & acc unt
3 Kloset Jongkok type CE 6 ex. Toto unt
4 Urinoir type U 57 M ex. Toto unt
5 Bak air fibreglass uk. 55x55x60 cm bh
6 Shower Spray type THX 20 NBPIV ex. Toto unt
7 Shower Set type TX 423 SZ ex. Toto unt
8 Floordrain TX 1B ex. Toto bh
9 Tempat Sabun S 11 N EX. Toto bh
10 Kran zink T 30 AR13NV7N ex. Toto bh
11 Kitchenzink Hwaco 1L unt
12 Kran dinding type T 23 B13V7N ex. Toto bh

XIII BAHAN PARTISI DINDING /PLAFOND


1 Gypsumboard t.9 mm ex. Jayaboard ; uk 120 x 240 cm lbr
2 List Profil 5 cm Gypsum m
3 Rangka plafond Metal furing termasuk paku ripet & acc m2

XIV BAHAN SALURAN AIR


1 Pipa PVC dia 1/2" ex. Wavin ; P. 4 m m'
2 Pipa PVC dia 3/4" ex. Wavin ; P. 4 m m'
3 Pipa PVC dia 1" ex. Wavin ; P. 4 m m'
4 Pipa PVC dia 2" ex. Wavin ; P. 4 m m'
5 Pipa PVC dia 3" ex. Wavin ; P. 4 m m'
6 Pipa PVC dia 4" ex. Wavin ; P. 4 m m'
7 Stop kran dia 1" ex. Onda bh
8 Klep diameter 3/4" ex. Onda bh
9 Tangki air 1000 liter EXEL bh
10 Tangki air 500 liter EXEL bh
11 Pelampung otomats bh
12 Roof Drain Metal Bh
13 Mesin Jet Pump kap.250 wat Groundfos unt
14 Mesin Pompa tekan kap. 150 wat Groundfos unt

XV PERALATAN ELEKTRIKAL
1 Box panel PVC isi 4 MCB Legran bh
2 MCB 6 A Legran bh
3 MCB 4 A Legran bh
4 Kabel NYM 2 x 2,5 mm2 m'
5 Kabel NYM 3 x 2,5 mm2 m'
6 Kabel telephone 4 x 0.5 mm m'
7 Isolasi bh

117 dari 558


NO URAIAN KETERANGAN SATUAN
8 Saklar tunggal Broco bh
9 Saklar ganda Broco bh
10 Stop kontak Broco bh
11 Outlet TV Broco bh
12 Outlet Telephone Broco bh
13 Down light / PLC 13 W bh
14 Fitting plafond + lampu SL Panasonic bh
15 Lampu TL 2 x 18 wat grille Panasonic bh
16 Lampu TL 2 x 36 wat grille Panasonic bh

XVI UPAH PEKERJA :


1 Tukang Besi Konstruksi Org/Hari
2 Tukang Besi Tulangan Org/Hari
3 Kepala Tukang Besi Org/Hari
4 Tukang Kayu Kasar (Plafond , Kuda/Gording, R.Atap) Org/Hari
5 Tukang Kayu Halus (Kusen) Org/Hari
6 Kepala Tukang Kayu Org/Hari
7 Tukang Batu Kasar Tukang Batu Kasar Org/Hari
8 Tukang Batu Halus Tukang Batu Halus (Bata,Plester,Acian list2) Org/Hari
9 Kepala Tukang Batu Org/Hari
10 Tukang Cat Biasa Org/Hari
11 Kepala Tukang Cat Org/Hari
12 Tukang Listrik Org/Hari
13 Kepala Tukang Listrik Org/Hari
14 Pekerja Org/Hari
15 Mandor Org/Hari
XVII LAIN-lAIN
1 IMB m2

118 dari 558


HARGA SATUAN

800
5,000
105,700
207,800
234,650
112,250
168,050
144,050
107,200
96,300

73,900
2,200

14,200
14,500
18,050
124,800
212,950
18,050

18,009,150
9,500,000
5,400,300
3,484,050
8,400

62,450
62,450
62,450
750,000
18,250
199,500

119 dari 558


HARGA SATUAN
89,250
119,600
160,650
94,500
19,900
14,300

52,250
66,100
120,050

45,650
394,150
15,217
98,538

2,000
10,250
6,050
10,500
48,250

80,000
95,000
190,000

14,500
14,500
14,500
3,700

50,650
24,050
24,050
36,050
24,050
4,900
7,300
21,010
15,000
35,500

120 dari 558


HARGA SATUAN
11,000
2,400
4,400

372,050
2,400,150
141,050
658,240
275,000
181,000
598,000
51,900
44,000
299,000
700,900
115,000

71,850
18,050
50,000

7,008
12,763
10,617
29,008
53,017
76,017
45,000
35,000
1,864,000
1,116,500
25,000
35,000
950,000
550,000

150,000
50,000
50,000
14,025
18,900
15,000
5,000

121 dari 558


HARGA SATUAN
14,700
14,700
24,500
43,575
43,575
173,460
75,000
80,850
110,513

42,000
42,000
52,500
52,500
52,500
52,500
42,000
42,000
52,500
47,250
52,500
50,000
52,500
35,000
63,000

15,000

122 dari 558


- 82 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

I PENGAIRAN
24.09.01 Pekerjaan Bangunan Air
24.09.01.01 Pengukuran Bangunan MC untuk JIAT Buah
Tenaga:
22.01.01.03.02 Juru Ukur 0.250 O.H
22.01.01.03.08 Pekerja/Buruh Tak Terampil 0.750 O.H
Bahan:
20.01.01.62.40 Patok Kayu Meranti 0.002 m3
20.01.01.09.01.05 Cat Meni/dasar 0.020 kg
20.01.01.40.09 Paku Payung 0.010 kg
Peralatan:
21.02.01.01.21 Sewa Pesawat Ukur (Poligone) 0.250 Jam
20.02.06.02.32 Meteran 0.020 Buah
21.02.01.02.21 Palu / Bodem 0.030 unit/Hari
Nilai HSPK :
24.09.01.02 Pengukuran Bangunan MC untuk Bendung Buah
Tenaga:
22.01.01.03.02 Juru Ukur 1.500 O.H
22.01.01.03.08 Pekerja/Buruh Tak Terampil 4.500 kg
Bahan:
20.01.01.62.40 Patok Kayu Meranti 0.012 m3
20.01.01.09.01.05 Cat Meni/dasar 0.120 kg
20.01.01.40.09 Paku Payung 0.050 kg
Peralatan:
21.02.01.01.21 Sewa Pesawat Ukur (Poligone) 1.000 Jam
20.02.06.02.32 Meteran 0.030 Buah
21.02.01.02.21 Palu / Bodem 0.060 unit/Hari
Nilai HSPK :
24.09.01.03 Pengukuran Saluran MC untuk JIAT km
Tenaga:
22.01.01.03.02 Juru Ukur 2.000 O.H
22.01.01.03.08 Pekerja/Buruh Tak Terampil 6.000 O.H
Bahan:
20.01.01.62.40 Patok Kayu Meranti 0.012 m3
20.01.01.09.01.05 Cat Meni/dasar 0.120 kg
20.01.01.40.09 Paku Payung 0.050 kg
Peralatan:
21.02.01.01.21 Sewa Pesawat Ukur (Poligone) 2.000 Jam
20.02.06.02.32 Meteran 0.045 Buah
21.02.01.02.21 Palu / Bodem 0.090 unit/Hari
Nilai HSPK :
24.09.01.04 Pengukuran Saluran MC untuk Saluran km
Terbuka
Tenaga:

Pemerintah Kabupaten Madiun


- 83 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

22.01.01.03.02 Juru Ukur 2.000 O.H


22.01.01.03.08 Pekerja/Buruh Tak Terampil 6.000 O.H
Bahan:
20.01.01.62.40 Patok Kayu Meranti 0.012 m3
20.01.01.09.01.05 Cat Meni/dasar 0.120 kg
20.01.01.40.09 Paku Payung 0.050 kg
Peralatan:
21.02.01.01.21 Pesawat Ukur/sewa 2.000 Jam
20.02.06.02.32 Meteran 0.045 Buah
21.02.01.02.21 Palu / Bodem 0.090 unit/Hari
Nilai HSPK :
24.09.01.05 Bronjong Kawat Galvanis D = 3 mm m3
(Uk : 0.50 x 1.00 x 2.00 m)
Tenaga:
22.01.01.01.09 Mandor Penganyaman 0.026 O.H
22.01.01.03.12 Penganyam 0.704 O.H
22.01.01.03.08 Pekerja Penganyam 0.576 O.H
22.01.01.01.09 Mandor Pengisi 0.024 O.H
22.01.01.03.08 Pekerja Pengisi 1.382 O.H

Pemerintah Kabupaten Madiun


- 84 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

Bahan:
20.01.01.08.12.06 Batu Kali 1.000 m3
20.01.01.61.02 Kawat Galvanis 8.334 kg
Peralatan:
02.04.02.08.06.17 Tang Pemotong Kawat 0.010 Buah
02.04.02.07.08.36 Palu kayu/besi 0.010 Buah
Nilai HSPK :
24.09.01.06 Bronjong Kawat Galvanis D = 4 mm m3
(Uk : 0.50 x 1.00 x 2.00 m)
Tenaga:
22.01.01.01.09 Mandor Penganyaman 0.026 O.H
22.01.01.03.12 Penganyam 0.704 O.H
22.01.01.03.08 Pekerja Penganyam 0.576 O.H
22.01.01.01.09 Mandor Pengisi 0.024 O.H
22.01.01.03.08 Pekerja Pengisi 1.382 O.H
Bahan:
20.01.01.08.12.06 Batu Kali 1.000 m3
20.01.01.61.02 Kawat Galvanis 15.000 kg
Peralatan:
02.04.02.08.06.17 Tang Pemotong Kawat 0.010 Buah
02.04.02.07.08.36 Palu kayu/besi 0.010 Buah
Nilai HSPK :
24.09.01.07 Pengadaan Bronjong Kawat Buah
Galvanis D = 4 mm (Uk: 0.50 x 1,00
x 2,00 m)

Tenaga:
22.01.01.01.09 Mandor Penganyaman 0.026 O.H
22.01.01.03.12 Penganyam 0.704 O.H
22.01.01.03.08 Pekerja Penganyam 0.576 O.H
Bahan:
20.01.01.61.02 Kawat Galvanis 15.000 kg
Peralatan:
02.04.02.08.06.17 Tang Pemotong Kawat 0.010 Buah
02.04.02.07.08.36 Palu kayu/besi 0.010 Buah
Nilai HSPK :
24.09.01.08 Gebalan Rumput m2
Tenaga:
22.01.01.01.09 Mandor 0.010 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 0.144 O.H
Bahan:
20.05.06.20.16 Gebalan Rumput 1.000 m2
Peralatan:
20.01.01.62.05 Tusuk Bambu 0.020 Buah
21.02.01.02.13 Gerobak 0.005 unit/Hari
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 85 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

24.09.01.09 Pendongkelan Rumpun Bambu m2


Tenaga:
22.01.01.01.09 Mandor 0.045 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 1.327 O.H
Peralatan:
21.02.01.02.09 Ganco 0.050 unit/Hari
20.01.01.62.03 Keranjang 0.225 Buah
Nilai HSPK :
24.09.01.10 Pendongkelan Rumpun Bambu dan Menimbun m2
Bekas Dongkelan
Tenaga:
22.01.01.01.09 Mandor 0.054 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 1.575 O.H
Bahan:
20.01.01.05.05 Tanah Urug 0.900 m3

Pemerintah Kabupaten Madiun


- 86 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

Peralatan:
21.02.01.01.03 Timbris 0.900 unit/Hari
21.02.01.02.16 Kereta Dorong 0.042 unit/Hari
21.02.01.02.09 Ganco 0.050 unit/Hari
20.01.01.62.03 Keranjang 0.225 Buah
Nilai HSPK :
24.09.01.11 Pendongkelan Pohon Keliling > 0.75 M Batang
Tenaga:
22.01.01.01.09 Mandor 0.400 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 3.000 O.H
Peralatan:
21.02.01.02.12 Gergaji Kayu 0.034 unit/Hari
21.02.01.02.26 Sabit Besar 0.040 unit/Hari
21.02.01.02.09 Ganco 0.050 unit/Hari
Nilai HSPK :
24.09.01.12 Pendongkelan Pohon Keliling > 0.75 M dan Batang
Menimbun Kembali Bekas Dongkelan
Tenaga:
22.01.01.01.09 Mandor 0.412 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 3.330 O.H
Bahan:
20.01.01.05.05 Tanah Urug 1.200 m3
Peralatan:
21.02.01.01.03 Timbris 1.200 unit/Hari
21.02.01.02.16 Kereta Dorong 0.042 unit/Hari
21.02.01.02.12 Gergaji Kayu 0.050 unit/Hari
21.02.01.02.09 Ganco 0.034 unit/Hari
21.02.01.02.26 Sabit Besar 0.040 unit/Hari
Nilai HSPK :
24.09.01.13 Pekerjaan Tiang Besi Siku 50.50.3 m1
Tenaga:
22.01.01.01.09 Mandor 0.015 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 0.350 O.H
Bahan:
20.01.01.13.10 Baja Siku 50.50.3 1.100 m1
20.01.01.37.01 Baut Angker 2.000 Buah
Nilai HSPK :
24.09.01.14 Pekerjaan Teralis Besi m2
Tenaga:
22.01.01.01.09 Mandor 0.006 O.H
22.01.01.01.06 Kepala Tukang Las 0.012 O.H
22.01.01.02.09 Tukang Las 1.200 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 1.200 O.H
Bahan:
20.01.01.13.11 Baja Strip 2 x 3 1.150 m2
Pemerintah Kabupaten Madiun
- 87 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

Nilai HSPK :
24.09.01.15 Stoplog Kayu Balau / Tahun m3
Tenaga:
22.01.01.01.09 Mandor 0.144 O.H
22.01.01.01.01 Kepala Tukang Batu 0.072 O.H
22.01.01.02.01 Tukang Batu 1.440 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 5.760 O.H
Bahan:
20.01.01.62.40 Kayu Balau / Tahun 1.000 m3
Peralatan:
21.02.01.02.21 Bodem 0.050 unit/Hari
21.02.01.02.02 Alat Bantu 0.036 Unit
Nilai HSPK :
24.09.01.16 Pengadaan dan Pemasangan Pompa Unit
Persiapan Pompa & Perlengkapannya Unit
TENAGA
22.01.01.01.09 Mandor 0.050 O.H
22.01.01.03.03 Mekanik Pompa 0.250 O.H
22.01.01.03.08 Pekerja / Buruh Tak terampil 0.500 O.H

Pemerintah Kabupaten Madiun


- 88 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

ALAT
21.02.01.02.01 Sikat baja, Isolasi, Drat Dll 1.000 Unit
20.02.01.08.06 Gear Box Oil 5.000 Liter
Nilai HSPK :
Angkutan Pompa & Perlengkapannya Unit
TENAGA
21.02.03.01.04 Angkutan ke Lokasi 0.500 Unit
22.01.01.03.08 Biaya Bongkar Muat 4 Orang 2.000 O.H
Pemasangan & Pengelasan Pompa Nilai HSPK :
Perlengkapannya Unit
TENAGA
22.01.01.01.09 Mandor 0.400 O.H
22.01.01.03.03 Mekanik Pompa 1.000 O.H
22.01.01.03.08 Pekerja 4.000 O.H
ALAT
21.02.01.01.11 Sewa / Truk Crane 1.000 Hari
20.05.06.20.18 Grease, Pacing Dll 1.000 set
21.02.03.01.13 Sewa / Operasional Mesin Las 1.000 Jam
Bahan Las, Bahan lain 1.000 set
Nilai HSPK :
Trial Run Pompa Unit
TENAGA
22.01.01.01.09 Mandor 0.100 O.H
22.01.01.03.03 Mekanik Pompa 1.000 O.H
ALAT
20.05.06.20.17 Gland Pacing, Fuel Filter, Air Filter Dll 1.000 Set
Nilai HSPK :
24.09.01.17 Pengadaan Mesin Penggerak dan Unit
Pemasangan perlengkapannya
Persiapan Pompa, Mesin & Unit
Perlengkapannya
TENAGA
22.01.01.01.09 Mandor 0.050 O.H
22.01.01.03.03 Mekanik Pompa 0.250 O.H
22.01.01.03.08 Pekerja Tak Trampil 0.500 O.H
ALAT
20.02.01.08.04 Minyak Pelumas Mesin 15.000 Liter
21.02.01.02.01 Sikat baja, Isolasi, Drat Dll 1.000 Unit
20.02.01.08.07 Gear Box Oil 5.000 Liter
Nilai HSPK :
Angkutan Pompa Mesin & Unit
Perlengkapannya
TENAGA
21.02.03.01.04 Angkutan ke Lokasi 0.500 Unit
22.01.01.03.08 Pekerja Tak Trampil 2.000 O.H
Nilai HSPK :
Pemerintah Kabupaten Madiun
- 89 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

Pemasangan & Pengelasan Mesin Unit


Pompa
TENAGA
22.01.01.01.09 Mandor 0.400 O.H
22.01.01.03.03 Mekanik Pompa 1.000 O.H
22.01.01.03.03 Mekanik Mesin 1.000 O.H
22.01.01.03.08 Pekerja 4.000 O.H
ALAT
21.02.01.01.11 Sewa / Truk Crane 1.000 unit/Hari
20.05.06.20.18 Grease, Pacing Dll 1.000 set
21.02.03.01.13 Sewa / Operasional Mesin Las 2.000 Jam
- Bahan Las, Bahan lain 1.000 set
Nilai HSPK :
Trial - Run Pemasangan Pompa & Mesin Unit
TENAGA
22.01.01.01.09 Mandor 1.000 O.H
22.01.01.03.03 Mekanik Pompa 1.000 O.H
22.01.01.03.03 Mekanik Mesin 1.000 O.H
22.01.01.03.08 Pekerja 2.000 O.H

Pemerintah Kabupaten Madiun


- 90 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

BAHAN
20.02.01.07.06 Solar 40.000 Liter
ALAT
20.05.06.20.17 Gland Pacing, Fuel Filter, Air Filter Dll 0.500 set
Nilai HSPK :
24.09.01.18 Pembuatan Pintu Air Type A Buah
(B=1950mm, H=2600mm,
H'=5550mm)
Tenaga:
Ongkos Kerja Konstruksi 1910.000 kg
Ongkos Kerja Mesin 574.000 kg
Ongkos Kerja Kayu 0.955 m3
Ongkos Sandblasting dan Cat 42.000 m2
12.165 m2
Ongkos Pengecatan Tanpa Sandblasting

Ongkos Pemasangan 2462.000 kg


Ongkos Pembongkaran 2463.000 kg
Transport 2463.000 kg
20.01.01.13.10 Besi Siku 27.000 kg
20.01.01.13.02 Besi Kanal 1002.000 kg
20.01.01.13.12 Plat Bronze 40.000 kg
20.01.01.13.11 Besi Plate 294.000 kg
20.01.01.13.11 Besi Plate Strip 480.000 kg
20.01.01.14.01.10 Besi Beton 67.000 kg
Bahan: Bantu Konstruksi (10% Bahan: 0.100
Konstruksi)
20.01.01.13.11 Besi Bulat st 60 292.000 kg
20.01.01.13.12 Bronze 96.000 kg
20.01.01.14.01.10 Besi polos 186.000 kg
20.01.04.08.07 Roda Gigi m.10 (112) kg 3.000 Ps
20.01.01.37.01 Mur Baut 1/2'', 5/8", 7/8" 40.000 kg
20.05.06.20.24 Nipple 6.000 kg
20.02.01.09.39 Spie 7.000 Buah
20.03.05.05.02.11 Gembok 1.000 Buah
20.02.01.09.08 Drucklager Kecil/besar 4.000 Buah
20.02.01.09.01 Angker Bolt (20kg) 8.000 Buah
20.02.01.09.40 Splite Pen / Pengunci 1.000 Buah
20.01.01.62.21 Kayu Jati Kaso 3"5"4 0.955 m3
20.02.01.09.23 Na F + Ring 3.000 kg
20.02.01.09.32 Seal Karet 7.410 m1
24.03.01.19 Beton Tumbuk 1 :2 : 3 0.340 m3
Nilai HSPK :
24.09.01.19 Pembuatan Pintu Air Type B Buah
(B=1000mm, H=1400mm,
H'=3200mm)
Tenaga:
Pemerintah Kabupaten Madiun
- 91 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

Ongkos Kerja Konstruksi 1104.000 kg


Transport 2463.000 kg
Ongkos Kerja Kayu 0.253 m3
Ongkos Sandblasting dan Cat 24.259 m2
4.166 m2
Ongkos Pengecatan Tanpa Sandblasting

Ongkos Pemasangan 1013.000 kg


Bahan:
20.01.01.13.10 Besi Siku 19.000 kg
20.01.01.13.02 Besi Kanal 600.000 kg
20.01.01.13.12 Plat Bronze 22.000 kg
20.01.01.13.11 Besi Plate 187.000 kg
20.01.01.13.11 Besi Plate Strip 228.000 kg
20.01.01.14.01.10 Besi Beton 48.000 kg
Bahan: Bantu Konstruksi (10% Bahan: 0.100
Konstruksi)
20.01.01.13.11 Besi Bulat st 60 101.000 kg
20.01.01.13.12 Bronze 47.000 kg
20.01.01.14.01.10 Besi polos 65.000 kg
20.01.04.08.07 Roda Gigi m.10 (112) kg 1.000 Ps

Pemerintah Kabupaten Madiun


- 92 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

20.01.01.37.01 Mur Baut 1/2'', 5/8", 7/8" 38.000 kg


20.05.06.20.24 Nipple 2.000 Buah
20.02.01.09.39 Spie 3.000 Buah
20.03.05.05.02.11 Gembok 1.000 Buah
20.02.01.09.08 Drucklager Kecil/besar 2.000 Buah
20.02.01.09.01 Angker Bolt (20kg) 8.000 Buah
20.02.01.09.40 Splite Pen / Pengunci 1.000 Buah
20.01.01.62.21 Kayu Jati 0.253 m3
20.02.01.09.23 Na F + Ring 2.000 Kg
20.02.01.09.32 Seal Karet 4.060 m1
24.03.01.19 Beton Tumbuk 1 :2 : 3 0.340 m3
Nilai HSPK :
24.09.01.20 Pembuatan Pintu Air Type C2 (B=1000mm, Buah
H=2000mm, H'=3000mm)
Tenaga:
Ongkos Kerja Konstruksi 745.000 kg
Ongkos Kerja Mesin 128.000 kg
14.118 m2
Ongkos Pengecatan Tanpa Sandblasting

Ongkos Pemasangan 873.000 kg


Ongkos Pembongkaran 873.000 kg
Transport 873.000 kg
Bahan:
20.01.01.13.10 Besi Siku 433.000 kg
20.01.01.13.11 Besi Plate 223.000 kg
20.01.01.13.11 Besi Plate Strip 68.000 kg
20.01.01.14.01.10 Besi Beton 20.000 kg
20.05.06.01.06 Pipa 1.000 m1
Bahan: Bantu Konstruksi (10% Bahan: 0.100
Konstruksi)
20.01.01.13.11 Besi Bulat st 60 69.000 kg
20.01.01.13.12 Bronze 23.000 kg
20.01.01.14.01.10 Besi polos 36.000 kg
20.01.01.37.01 Mur Baut 1/2'', 5/8", 7/8" 5.000 kg
20.01.01.40.08 Paku Keling 3/4'', 5/8", 7/8" 15.000 kg
20.05.06.20.24 Nipple 1.000 kg
20.02.01.09.40 Splite Pen / Pengunci 2.000 Buah
20.03.05.05.02.11 Gembok hitam Cooper 75 2.000 Buah
20.02.01.09.08 Drucklager Kecil/besar 1.000 Buah
20.02.01.09.23 Na F + Ring 1.000 Buah
24.03.01.19 Beton Tumbuk 1 :2 : 3 0.160 m3
Nilai HSPK :
24.09.01.21 Pembuatan Pintu Air Type C2 (B=600mm, Buah
H=600mm, H'=3000mm)
Tenaga:
Ongkos Kerja Konstruksi 286.000 kg
Pemerintah Kabupaten Madiun
- 93 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

Ongkos Kerja Mesin 99.000 kg


6.168 m2
Ongkos Pengecatan Tanpa Sandblasting

Ongkos Pemasangan 296.000 kg


Ongkos Pembongkaran 296.000 kg
Transport 296.000 kg
Bahan:
20.01.01.13.10 Besi Siku 193.000 kg
20.01.01.13.11 Besi Plate 33.000 kg
20.01.01.13.11 Besi Plate Strip 45.000 kg
20.01.01.14.01.10 Besi Beton 14.000 kg
20.05.06.01.06 Pipa 1.000 m1
Bahan: Bantu Konstruksi (10% Bahan: 0.100
Konstruksi)
20.01.01.13.11 Besi Bulat st 60 47.000 kg
20.01.01.13.12 Bronze 16.000 kg
20.01.01.14.01.10 Besi polos 36.000 kg
20.01.01.37.01 Mur Baut 1/2'', 5/8", 7/8" 5.000 kg
20.01.01.40.08 Paku Keling 3/4'', 5/8", 7/8" 11.000 kg
20.05.06.20.24 Nipple 1.000 kg

Pemerintah Kabupaten Madiun


- 94 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

20.02.01.09.40 Splite Pen / Pengunci 2.000 Buah


20.03.05.05.02.11 Gembok hitam Cooper 75 2.000 Buah
20.02.01.09.08 Drucklager Kecil/besar 1.000 Buah
20.02.01.09.23 Na F + Ring 1.000 Buah
24.03.01.19 Beton Tumbuk 1 :2 : 3 0.100 m3
Nilai HSPK :
24.09.01.22 Operasi Mesin Gilas m3
Tenaga:
22.01.01.03.06 Operator 30.000 O.H
22.01.01.03.11 Pembantu Operator 30.000 O.H
22.01.01.03.13 Penjaga Malam 30.000 O.H
22.01.01.03.08 Pekerja 150.000 O.H
Bahan:
20.02.01.07.06 Solar 1.000 Liter
20.02.01.08.04 Minyak Pelumas 20.000 Liter
20.02.01.08.02 Gemuk 5.000 kg
Nilai HSPK :
24.09.01.23 Pek. Pengeboran Sumur segala formasi, dia. 8 m1
3/4 "
Tenaga:
22.01.01.01.09 Mandor 0.030 O.H
22.01.01.04.07 Tool Pusher 0.042 O.H
22.01.01.04.04 Driller 0.210 O.H
22.01.01.04.03 Assisten Driller 0.210 O.H
22.01.01.03.03 Mekanik 0.210 O.H
22.01.01.05.05 Welder 0.210 O.H
22.01.01.05.07 Helper/Fillter 0.280 O.H
22.01.01.04.08 Watchman 0.280 O.H
22.01.01.05.06 Operator Crane 0.140 O.H
Bahan:
20.02.01.07.06 Solar 0.693 Liter
20.02.01.08.04 Minyak Pelumas 0.041 Liter
20.02.01.08.02 Gemuk 0.105 kg
Peralatan:
21.02.01.01.13 Drilling Rig 0.044 Jam
21.02.01.01.19 Mud Pump 0.105 Jam
21.02.03.01. Cargo Truck 5.0 Ton 0.070 Jam
21.02.01.01.12 Crane on Truck 0.070 jam
Nilai HSPK :
24.09.01.24 Pek. Pengeboran Sumur segala formasi m1
kedalaman 0 s/d 100 m, dia. 6"
Tenaga:
22.01.01.01.09 Mandor 0.030 O.H
22.01.01.04.07 Tool Pusher 0.042 O.H
22.01.01.04.04 Driller 0.212 O.H

Pemerintah Kabupaten Madiun


- 95 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

22.01.01.04.03 Assisten Driller 0.212 O.H


22.01.01.03.03 Mekanik 0.210 O.H
22.01.01.05.05 Welder 0.210 O.H
22.01.01.05.07 Helper/Fillter 0.280 O.H
22.01.01.04.08 Watchman 0.280 O.H
22.01.01.05.06 Operator Crane 0.140 O.H
Bahan:
20.02.01.07.06 Solar 0.693 Liter
20.02.01.08.04 Minyak Pelumas 0.041 Liter
20.02.01.08.02 Gemuk 0.105 kg
Peralatan:
21.02.01.01.13 Drilling Rig 0.018 Jam
21.02.01.01.19 Mud Pump 0.070 jam
21.02.03.01. Cargo Truck 5.0 Ton 0.070 Jam
21.02.01.01.12 Crane on Truck 0.070 jam
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 96 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

24.09.01.25 Pek. Pengeboran Sumur segala formasi m1


kedalaman 0 s/d 100 m, dia. 8 3/4"
Tenaga:
22.01.01.01.09 Mandor 0.030 O.H
22.01.01.04.07 Tool Pusher 0.042 O.H
22.01.01.04.04 Driller 0.315 O.H
22.01.01.04.03 Assisten Driller 0.315 O.H
22.01.01.03.03 Mekanik 0.315 O.H
22.01.01.05.05 Welder 0.252 O.H
22.01.01.05.07 Helper/Fillter 0.280 O.H
22.01.01.04.08 Watchman 0.280 O.H
22.01.01.05.06 Operator Crane 0.140 O.H
Bahan:
20.02.01.07.06 Solar 0.693 Liter
20.02.01.08.04 Minyak Pelumas 0.041 Liter
20.02.01.08.02 Gemuk 0.105 kg
Peralatan:
21.02.01.01.13 Drilling Rig 0.066 Jam
21.02.01.01.19 Mud Pump 0.140 Jam
21.02.03.01. Cargo Truck 5.0 Ton 0.070 Jam
21.02.01.01.12 Crane on Truck 0.070 jam
Nilai HSPK :
24.09.01.26 Pek. Pengeboran Sumur segala formasi m1
kedalaman 0 s/d 100 m, dia. 12"
Tenaga:
22.01.01.01.09 Mandor 0.030 O.H
22.01.01.04.07 Tool Pusher 0.042 O.H
22.01.01.04.04 Driller 0.315 O.H
22.01.01.04.03 Assisten Driller 0.315 O.H
22.01.01.03.03 Mekanik 0.315 O.H
22.01.01.05.05 Welder 0.252 O.H
22.01.01.05.07 Helper/Fillter 0.280 O.H
22.01.01.04.08 Watchman 0.280 O.H
22.01.01.05.06 Operator Crane 0.140 O.H
Bahan:
20.02.01.07.06 Solar 0.693 Liter
20.02.01.08.04 Minyak Pelumas 0.041 Liter
20.02.01.08.02 Gemuk 0.105 kg
Peralatan:
21.02.01.01.13 Drilling Rig 0.066 Jam
21.02.01.01.19 Mud Pump 0.140 jam
21.02.03.01. Cargo Truck 5.0 Ton 0.070 Jam
21.02.01.01.12 Crane on Truck 0.070 jam
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 97 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

24.09.01.27 Pek. Pengeboran Sumur segala formasi, m1


Pembesaran lubang bor dia. 8 3/4" ke 18"
Tenaga:
22.01.01.01.09 Mandor 0.030 O.H
22.01.01.04.07 Tool Pusher 0.087 O.H
22.01.01.04.04 Driller 0.435 O.H
22.01.01.04.03 Assisten Driller 0.435 O.H
22.01.01.03.03 Mekanik 0.435 O.H
22.01.01.05.05 Welder 0.435 O.H
22.01.01.05.07 Helper/Fillter 0.580 O.H
22.01.01.04.08 Watchman 0.435 O.H
22.01.01.05.06 Operator Crane 0.140 O.H
Bahan:
20.02.01.07.06 Solar 1.436 Liter
20.02.01.08.04 Minyak Pelumas 0.085 Liter
20.02.01.08.02 Gemuk 0.218 kg
Peralatan:
21.02.01.01.13 Drilling Rig 0.091 Jam
21.02.03.01. Cargo Truck 5.0 Ton 0.073 Jam
21.02.01.01.12 Crane on Truck 0.073 jam
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 98 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

24.09.01.28 Pek. Pengadaan/Pemasangan Pipa Sumur m1


Bor, PVC dia. 12"
Tenaga:
22.01.01.01.09 Mandor 0.030 O.H
22.01.01.04.07 Tool Pusher 0.030 O.H
22.01.01.04.04 Driller 0.100 O.H
22.01.01.04.03 Assisten Driller 0.100 O.H
22.01.01.03.03 Mekanik 0.100 O.H
22.01.01.05.05 Welder 0.100 O.H
22.01.01.05.07 Helper/Fillter 0.400 O.H
22.01.01.04.08 Watchman 0.100 O.H
22.01.01.05.06 Operator Crane 0.100 O.H
Bahan:
20.05.06.01.32 Pipa PVC Maspion AW 12" x 6m 0.167 Btg
20.02.01.07.06 Solar 1.436 Liter
20.02.01.08.04 Minyak Pelumas 0.117 Liter
20.02.01.08.02 Gemuk 0.300 kg
Peralatan:
21.02.01.01.13 Drilling Rig 0.145 jam
21.02.03.01. Cargo Truck 5.0 Ton 0.073 Jam
21.02.01.01.12 Crane on Truck 0.073 jam
Nilai HSPK :
24.09.01.29 Pek. Pengadaan/Pemasangan Pipa Sumur m1
Bor, PVC dia. 6"
Tenaga:
22.01.01.01.09 Mandor 0.020 O.H
22.01.01.04.07 Tool Pusher 0.022 O.H
22.01.01.04.04 Driller 0.073 O.H
22.01.01.04.03 Assisten Driller 0.073 O.H
22.01.01.03.03 Mekanik 0.073 O.H
22.01.01.05.05 Welder 0.073 O.H
22.01.01.05.07 Helper/Fillter 0.290 O.H
22.01.01.04.08 Watchman 0.073 O.H
22.01.01.05.06 Operator Crane 0.073 O.H
Bahan:
20.05.06.01.29 Pipa PVC Maspion AW 6" x 6m 0.167 Btg
20.02.01.07.06 Solar 1.436 Liter
20.02.01.08.04 Minyak Pelumas 0.085 Liter
20.02.01.08.02 Gemuk 0.218 kg
Peralatan:
21.02.01.01.13 Drilling Rig 0.145 Jam
21.02.03.01. Cargo Truck 5.0 Ton 0.073 Jam
21.02.01.01.12 Crane on Truck 0.073 jam
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 99 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

24.09.01.30 Pek. Pengadaan/Pemasangan Pipa Sumur m1


Bor, PVC dia. 6" (Screen)
Tenaga:
22.01.01.01.09 Mandor 0.020 O.H
22.01.01.04.07 Tool Pusher 0.022 O.H
22.01.01.04.04 Driller 0.073 O.H
22.01.01.04.03 Assisten Driller 0.073 O.H
22.01.01.03.03 Mekanik 0.073 O.H
22.01.01.05.05 Welder 0.073 O.H
22.01.01.05.07 Helper/Fillter 0.290 O.H
22.01.01.04.08 Watchman 0.073 O.H
22.01.01.05.06 Operator Crane 0.073 O.H
Bahan:
20.05.06.01.91 Screen dia = 6" klas VP AWS 10 1.000 m1
20.02.01.07.06 Solar 1.436 Liter
20.02.01.08.04 Minyak Pelumas 0.085 Liter
20.02.01.08.02 Gemuk 0.218 kg
Peralatan:
21.02.01.01.13 Drilling Rig 0.018 jam
21.02.03.01. Cargo Truck 5.0 Ton 0.073 jam
21.02.01.01.12 Crane on Truck 0.073 jam
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 100 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

24.09.01.31 Pencucian dan Pembersihan Lobang m1


Sumur
Tenaga:
22.01.01.01.09 Mandor 0.020 O.H
22.01.01.04.07 Tool Pusher 0.022 O.H
22.01.01.04.04 Driller 0.250 O.H
22.01.01.04.03 Assisten Driller 0.250 O.H
22.01.01.03.03 Mekanik 0.250 O.H
22.01.01.05.05 Welder 0.250 O.H
22.01.01.05.07 Helper/Fillter 1.000 O.H
22.01.01.04.08 Watchman 0.250 O.H
22.01.01.05.06 Operator Crane 0.250 O.H
Bahan:
20.02.01.07.06 Solar 4.950 Liter
20.02.01.08.04 Minyak Pelumas 0.293 Liter
20.02.01.08.02 Gemuk 0.750 kg
Peralatan:
21.02.01.01.13 Drilling Rig 0.063 jam
21.02.01.01.19 Mud Pump 0.750 jam
21.02.01.01.08 Air Compressor 0.750 jam
21.02.01.01.12 Crane on Truck 0.250 jam
Nilai HSPK :
24.09.01.32 Pekerjaan Uji Pompa Test m1
Tenaga:
22.01.01.04.05 Kepala Laboratorium 0.125 O.H
22.01.01.03.06 Operator 0.125 O.H
22.01.01.03.03 Mekanik 0.125 O.H
22.01.01.05.07 Helper/Fillter 0.500 O.H
22.01.01.05.06 Operator Crane 0.125 O.H
Bahan:
20.02.01.07.06 Solar 2.475 Liter
20.02.01.08.04 Minyak Pelumas 0.293 Liter
20.02.01.08.02 Gemuk 0.375 kg
Peralatan:
21.02.01.01.35 Pompa Uji 0.375 jam
21.02.01.01.12 Crane on Truck 0.125 jam
Nilai HSPK :
24.09.02. Pekerjaan Beton Struktur Bangunan Air m3
24.09.02.01 Beton Struktur Bertulang K - 175 m3
Bahan:
Err:509 Beton Struktur Klas 175 1.000 m3
24.03.01.14 Besi Tulangan 100.000 Kg
24.03.01.01 Bekisting 10.000 m2
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 101 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

24.09.02.02 Beton Struktur Bertulang K - 225 m3


Bahan:
Err:509 Beton Struktur Klas 225 1.000 m3
24.03.01.14 Besi Tulangan 125.000 Kg
24.03.01.01 Bekisting 10.000 m2
Nilai HSPK :
24.09.02.03 Beton Bertulang K - 175 untuk Sloof m3
Bahan:
Err:509 Beton Mutu K - 175 1.000 m3
24.03.01.14 Besi Tulangan 100.000 Kg
24.03.01.03 Bekisting 10.000 m2
Nilai HSPK :
24.09.02.04 Beton Bertulang K - 225 untuk Sloof m3
Bahan:
Err:509 Beton Mutu K - 225 1.000 m3
24.03.01.14 Besi Tulangan 125.000 Kg
24.03.01.03 Bekisting 10.000 m2
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 102 -

Koef. SATUAN
NOMOR URAIAN KEGIATAN

24.09.02.05 Beton Bertulang K - 175 untuk Kolom m3


Bahan:
Err:509 Beton Mutu K - 175 1.000 m3
24.03.01.14 Besi Tulangan 100.000 Kg
24.03.01.05 Bekisting 10.000 m2
Nilai HSPK :
24.09.02.06 Beton Bertulang K - 225 untuk Kolom m3
Bahan:
Err:509 Beton Mutu K - 225 1.000 m3
24.03.01.14 Besi Tulangan 125.000 Kg
24.03.01.05 Bekisting 10.000 m2
Nilai HSPK :
24.09.02.07 Beton Bertulang K - 175 untuk Balok m3
Bahan:
Err:509 Beton Mutu K - 175 1.000 m3
24.03.01.14 Besi Tulangan 100.000 Kg
24.03.01.07 Bekisting 10.000 m2
Nilai HSPK :
24.09.02.08 Beton Bertulang K - 225 untuk Balok m3
Bahan:
Err:509 Beton Mutu K - 225 1.000 m3
24.03.01.14 Besi Tulangan 125.000 Kg
24.03.01.07 Bekisting 10.000 m2
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 103 -

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 25,000.00
Rp 65,000.00 Rp 48,750.00

Rp 5,386,100.00 Rp 10,772.20
Rp 28,200.00 Rp 564.00
Rp - Rp -

Rp 60,750.00 Rp 15,187.50
Rp - Rp -
Rp 6,150.00 Rp 184.50
Nilai HSPK : Rp 100,458.20

Rp 100,000.00 Rp 150,000.00
Rp 65,000.00 Rp 292,500.00

Rp 5,386,100.00 Rp 64,633.20
Rp 28,200.00 Rp 3,384.00
Rp - Rp -

Rp 60,750.00 Rp 60,750.00
Rp - Rp -
Rp 6,150.00 Rp 369.00
Nilai HSPK : Rp 571,636.20

Rp 100,000.00 Rp 200,000.00
Rp 65,000.00 Rp 390,000.00

Rp 5,386,100.00 Rp 64,633.20
Rp 28,200.00 Rp 3,384.00
Rp - Rp -

Rp 60,750.00 Rp 121,500.00
Rp - Rp -
Rp 6,150.00 Rp 553.50
Nilai HSPK : Rp 780,070.70

Pemerintah Kabupaten Madiun


- 104 -

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 200,000.00
Rp 65,000.00 Rp 390,000.00

Rp 5,386,100.00 Rp 64,633.20
Rp 28,200.00 Rp 3,384.00
Rp - Rp -

Rp 60,750.00 Rp 121,500.00
Rp - Rp -
Rp 6,150.00 Rp 553.50
Nilai HSPK : Rp 780,070.70

Rp 60,000.00 Rp 1,560.00
Rp 40,000.00 Rp 28,160.00
Rp 65,000.00 Rp 37,440.00
Rp 60,000.00 Rp 1,440.00
Rp 65,000.00 Rp 89,830.00

Pemerintah Kabupaten Madiun


- 105 -

HARGA
HARGA
SATUAN

Rp 112,000.00 Rp 112,000.00
Rp 16,500.00 Rp 137,511.00

Rp - Rp -
Rp - Rp -
Nilai HSPK : Rp 407,941.00

Rp 60,000.00 Rp 1,560.00
Rp 40,000.00 Rp 28,160.00
Rp 65,000.00 Rp 37,440.00
Rp 60,000.00 Rp 1,440.00
Rp 65,000.00 Rp 89,830.00

Rp 112,000.00 Rp 112,000.00
Rp 16,500.00 Rp 247,500.00

Rp - Rp -
Rp - Rp -
Nilai HSPK : Rp 517,930.00

Rp 60,000.00 Rp 1,560.00
Rp 40,000.00 Rp 28,160.00
Rp 65,000.00 Rp 37,440.00

Rp 16,500.00 Rp 247,500.00

Rp - Rp -
Rp - Rp -
Nilai HSPK : Rp 314,660.00

Rp 60,000.00 Rp 600.00
Rp 65,000.00 Rp 9,360.00

Rp - Rp -

Rp 2,250.00 Rp 45.00
Rp 40,650.00 Rp 203.25
Nilai HSPK : Rp 10,208.25

Pemerintah Kabupaten Madiun


- 106 -

HARGA
HARGA
SATUAN

Rp 60,000.00 Rp 2,700.00
Rp 65,000.00 Rp 86,255.00

Rp 6,850.00 Rp 342.50
Rp 12,300.00 Rp 2,767.50
Nilai HSPK : Rp 92,065.00

Rp 60,000.00 Rp 3,240.00
Rp 65,000.00 Rp 102,375.00

Rp 75,000.00 Rp 67,500.00

Pemerintah Kabupaten Madiun


- 107 -

HARGA
HARGA
SATUAN

Rp 33,600.00 Rp 30,240.00
Rp 7,150.00 Rp 300.30
Rp 6,850.00 Rp 342.50
Rp 12,300.00 Rp 2,767.50
Nilai HSPK : Rp 206,765.30

Rp 60,000.00 Rp 24,000.00
Rp 65,000.00 Rp 195,000.00

Rp 6,850.00 Rp 232.90
Rp 15,050.00 Rp 602.00
Rp 6,850.00 Rp 342.50
Nilai HSPK : Rp 220,177.40

Rp 60,000.00 Rp 24,720.00
Rp 65,000.00 Rp 216,450.00

Rp 75,000.00 Rp 90,000.00

Rp 33,600.00 Rp 40,320.00
Rp 7,150.00 Rp 300.30
Rp 6,850.00 Rp 342.50
Rp 6,850.00 Rp 232.90
Rp 15,050.00 Rp 602.00
Nilai HSPK : Rp 372,967.70

Rp 60,000.00 Rp 900.00
Rp 65,000.00 Rp 22,750.00

Rp 12,750.00 Rp 14,025.00
Rp - Rp -
Nilai HSPK : Rp 37,675.00

Rp 60,000.00 Rp 360.00
Rp 95,000.00 Rp 1,140.00
Rp 90,000.00 Rp 108,000.00
Rp 65,000.00 Rp 78,000.00

Rp 12,750.00 Rp 14,662.50
Pemerintah Kabupaten Madiun
- 108 -

HARGA
HARGA
SATUAN

Nilai HSPK : Rp 202,162.50

Rp 60,000.00 Rp 8,640.00
Rp 50,000.00 Rp 3,600.00
Rp 40,000.00 Rp 57,600.00
Rp 65,000.00 Rp 374,400.00

Rp 5,386,100.00 Rp 5,386,100.00

Rp 6,150.00 Rp 307.50
Rp 98,400.00 Rp 3,542.40
Nilai HSPK : Rp 5,834,189.90

Rp 60,000.00 Rp 3,000.00
Rp 90,000.00 Rp 22,500.00
Rp 65,000.00 Rp 32,500.00

Pemerintah Kabupaten Madiun


- 109 -

HARGA
HARGA
SATUAN

Rp 15,700.00 Rp 15,700.00
Rp - Rp -
Nilai HSPK : Rp 73,700.00

Rp 391,600.00 Rp 195,800.00
Rp 65,000.00 Rp 130,000.00
Nilai HSPK : Rp 325,800.00

Rp 60,000.00 Rp 24,000.00
Rp 90,000.00 Rp 90,000.00
Rp 65,000.00 Rp 260,000.00

Rp 989,750.00 Rp 989,750.00
Rp - Rp -
Rp 63,000.00 Rp 63,000.00
Rp 40,000.00 Rp 40,000.00
Nilai HSPK : Rp 1,363,750.00

Rp 60,000.00 Rp 6,000.00
Rp 90,000.00 Rp 90,000.00

Rp - Rp -
Nilai HSPK : Rp 96,000.00

Rp 60,000.00 Rp 3,000.00
Rp 90,000.00 Rp 22,500.00
Rp 65,000.00 Rp 32,500.00

Rp 40,000.00 Rp 600,000.00
Rp 15,700.00 Rp 15,700.00
Rp - Rp -
Nilai HSPK : Rp 673,700.00

Rp 391,600.00 Rp 195,800.00
Rp 65,000.00 Rp 130,000.00
Nilai HSPK : Rp 325,800.00
Pemerintah Kabupaten Madiun
- 110 -

HARGA
HARGA
SATUAN

Rp 60,000.00 Rp 24,000.00
Rp 90,000.00 Rp 90,000.00
Rp 90,000.00 Rp 90,000.00
Rp 65,000.00 Rp 260,000.00

Rp 989,750.00 Rp 989,750.00
Rp - Rp -
Rp 63,000.00 Rp 126,000.00
Rp 40,000.00 Rp 40,000.00
Nilai HSPK : Rp 1,619,750.00

Rp 60,000.00 Rp 60,000.00
Rp 90,000.00 Rp 90,000.00
Rp 90,000.00 Rp 90,000.00
Rp 65,000.00 Rp 130,000.00

Pemerintah Kabupaten Madiun


- 111 -

HARGA
HARGA
SATUAN

Rp 5,750.00 Rp 230,000.00

Rp - Rp -
Nilai HSPK : Rp 600,000.00

Rp 1,250.00 Rp 2,387,500.00
Rp 6,000.00 Rp 3,444,000.00
Rp 500,000.00 Rp 477,500.00
Rp 55,000.00 Rp 2,310,000.00

Rp 27,500.00 Rp 334,537.50

Rp 700.00 Rp 1,723,400.00
Rp 500.00 Rp 1,231,500.00
Rp 500.00 Rp 1,231,500.00
Rp 12,750.00 Rp 344,250.00
Rp 13,000.00 Rp 13,026,000.00
Rp 29,100.00 Rp 1,164,000.00
Rp 12,750.00 Rp 3,748,500.00
Rp 12,750.00 Rp 6,120,000.00
Rp 10,500.00 Rp 703,500.00

Rp 25,106,250.00 Rp 2,510,625.00

Rp 12,750.00 Rp 3,723,000.00
Rp 29,100.00 Rp 2,793,600.00
Rp 10,500.00 Rp 1,953,000.00
Rp 2,520,000.00 Rp 7,560,000.00
Rp - Rp -
Rp - Rp -
Rp 167,850.00 Rp 1,174,950.00
Rp 106,600.00 Rp 106,600.00
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 7,873,350.00 Rp 7,519,049.25
Rp - Rp -
Rp - Rp -
Rp 798,940.08 Rp 271,639.63
Nilai HSPK : Rp 65,858,651.38

Pemerintah Kabupaten Madiun


- 112 -

HARGA
HARGA
SATUAN

Rp 1,250.00 Rp 1,380,000.00
Rp 500.00 Rp 1,231,500.00
Rp 500,000.00 Rp 126,500.00
Rp 55,000.00 Rp 1,334,245.00

Rp 27,500.00 Rp 114,565.00

Rp 700.00 Rp 709,100.00

Rp 12,750.00 Rp 242,250.00
Rp 13,000.00 Rp 7,800,000.00
Rp 29,100.00 Rp 640,200.00
Rp 12,750.00 Rp 2,384,250.00
Rp 12,750.00 Rp 2,907,000.00
Rp 10,500.00 Rp 504,000.00

Rp 14,477,700.00 Rp 1,447,770.00

Rp 12,750.00 Rp 1,287,750.00
Rp 29,100.00 Rp 1,367,700.00
Rp 10,500.00 Rp 682,500.00
Rp 2,520,000.00 Rp 2,520,000.00

Pemerintah Kabupaten Madiun


- 113 -

HARGA
HARGA
SATUAN

Rp - Rp -
Rp - Rp -
Rp 167,850.00 Rp 503,550.00
Rp 106,600.00 Rp 106,600.00
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 7,873,350.00 Rp 1,991,957.55
Rp - Rp -
Rp - Rp -
Rp 798,940.08 Rp 271,639.63
Nilai HSPK : Rp 29,553,077.18

Rp 1,250.00 Rp 931,250.00
Rp 6,000.00 Rp 768,000.00

Rp 27,500.00 Rp 388,245.00

Rp 700.00 Rp 611,100.00
Rp 500.00 Rp 436,500.00
Rp 500.00 Rp 436,500.00

Rp 12,750.00 Rp 5,520,750.00
Rp 12,750.00 Rp 2,843,250.00
Rp 12,750.00 Rp 867,000.00
Rp 10,500.00 Rp 210,000.00
Rp 62,200.00 Rp 62,200.00

Rp 9,503,200.00 Rp 950,320.00

Rp 12,750.00 Rp 879,750.00
Rp 29,100.00 Rp 669,300.00
Rp 10,500.00 Rp 378,000.00
Rp - Rp -
Rp 15,850.00 Rp 237,750.00
Rp - Rp -
Rp - Rp -
Rp 106,600.00 Rp 213,200.00
Rp - Rp -
Rp - Rp -
Rp 798,940.08 Rp 127,830.41
Nilai HSPK : Rp 16,530,945.41

Rp 1,250.00 Rp 357,500.00
Pemerintah Kabupaten Madiun
- 114 -

HARGA
HARGA
SATUAN

Rp 6,000.00 Rp 594,000.00

Rp 27,500.00 Rp 169,620.00

Rp 700.00 Rp 207,200.00
Rp 500.00 Rp 148,000.00
Rp 500.00 Rp 148,000.00

Rp 12,750.00 Rp 2,460,750.00
Rp 12,750.00 Rp 420,750.00
Rp 12,750.00 Rp 573,750.00
Rp 10,500.00 Rp 147,000.00
Rp 62,200.00 Rp 62,200.00

Rp 9,503,200.00 Rp 950,320.00

Rp 12,750.00 Rp 599,250.00
Rp 29,100.00 Rp 465,600.00
Rp 10,500.00 Rp 378,000.00
Rp - Rp -
Rp 15,850.00 Rp 174,350.00
Rp - Rp -

Pemerintah Kabupaten Madiun


- 115 -

HARGA
HARGA
SATUAN

Rp - Rp -
Rp 106,600.00 Rp 213,200.00
Rp - Rp -
Rp - Rp -
Rp 798,940.08 Rp 79,894.01
Nilai HSPK : Rp 8,149,384.01

Rp 90,000.00 Rp 2,700,000.00
Rp 90,000.00 Rp 2,700,000.00
Rp - Rp -
Rp 65,000.00 Rp 9,750,000.00

Rp 5,750.00 Rp 5,750.00
Rp 40,000.00 Rp 800,000.00
Rp - Rp -
Nilai HSPK : Rp 15,955,750.00

Rp 60,000.00 Rp 1,800.00
Rp 50,000.00 Rp 2,100.00
Rp 55,000.00 Rp 11,550.00
Rp 40,000.00 Rp 8,400.00
Rp 90,000.00 Rp 18,900.00
Rp 45,000.00 Rp 9,450.00
Rp 30,000.00 Rp 8,400.00
Rp - Rp -
Rp 45,000.00 Rp 6,300.00

Rp 5,750.00 Rp 3,984.75
Rp 40,000.00 Rp 1,640.80
Rp - Rp -

Rp 165,350.00 Rp 7,234.06
Rp 19,150.00 Rp 2,010.75
Rp - Rp -
Rp 343,050.00 Rp 24,013.50
Nilai HSPK : Rp 105,783.86

Rp 60,000.00 Rp 1,800.00
Rp 50,000.00 Rp 2,100.00
Rp 55,000.00 Rp 11,665.50

Pemerintah Kabupaten Madiun


- 116 -

HARGA
HARGA
SATUAN

Rp 40,000.00 Rp 8,484.00
Rp 90,000.00 Rp 18,900.00
Rp 45,000.00 Rp 9,450.00
Rp 30,000.00 Rp 8,400.00
Rp - Rp -
Rp 45,000.00 Rp 6,300.00

Rp 5,750.00 Rp 2,979.90
Rp 40,000.00 Rp 1,066.52
Rp - Rp 714.00

Rp 165,350.00 Rp 2,893.63
Rp 19,150.00 Rp 1,340.50
Rp - Rp -
Rp 343,050.00 Rp 24,013.50
Nilai HSPK : Rp 100,107.55

Pemerintah Kabupaten Madiun


- 117 -

HARGA
HARGA
SATUAN

Rp 60,000.00 Rp 1,800.00
Rp 50,000.00 Rp 2,100.00
Rp 55,000.00 Rp 17,325.00
Rp 40,000.00 Rp 12,600.00
Rp 90,000.00 Rp 28,350.00
Rp 45,000.00 Rp 11,340.00
Rp 30,000.00 Rp 8,400.00
Rp - Rp -
Rp 45,000.00 Rp 6,300.00

Rp 5,750.00 Rp 3,984.75
Rp 40,000.00 Rp 1,640.80
Rp - Rp -

Rp 165,350.00 Rp 10,851.09
Rp 19,150.00 Rp 2,681.00
Rp - Rp -
Rp 343,050.00 Rp 24,013.50
Nilai HSPK : Rp 131,386.14

Rp 60,000.00 Rp 1,800.00
Rp 50,000.00 Rp 2,100.00
Rp 55,000.00 Rp 17,325.00
Rp 40,000.00 Rp 12,600.00
Rp 90,000.00 Rp 28,350.00
Rp 45,000.00 Rp 11,340.00
Rp 30,000.00 Rp 8,400.00
Rp - Rp -
Rp 45,000.00 Rp 6,300.00

Rp 5,750.00 Rp 3,984.75
Rp 40,000.00 Rp 1,640.80
Rp - Rp -

Rp 165,350.00 Rp 10,851.09
Rp 19,150.00 Rp 2,681.00
Rp - Rp -
Rp 343,050.00 Rp 24,013.50
Nilai HSPK : Rp 131,386.14

Pemerintah Kabupaten Madiun


- 118 -

HARGA
HARGA
SATUAN

Rp 60,000.00 Rp 1,800.00
Rp 50,000.00 Rp 4,350.00
Rp 55,000.00 Rp 23,925.00
Rp 40,000.00 Rp 17,400.00
Rp 90,000.00 Rp 39,150.00
Rp 45,000.00 Rp 19,575.00
Rp 30,000.00 Rp 17,400.00
Rp - Rp -
Rp 45,000.00 Rp 6,300.00

Rp 5,750.00 Rp 8,254.13
Rp 40,000.00 Rp 3,398.80
Rp - Rp -

Rp 165,350.00 Rp 14,984.84
Rp - Rp -
Rp 343,050.00 Rp 24,871.13
Nilai HSPK : Rp 181,408.89

Pemerintah Kabupaten Madiun


- 119 -

HARGA
HARGA
SATUAN

Rp 60,000.00 Rp 1,800.00
Rp 50,000.00 Rp 1,500.00
Rp 55,000.00 Rp 5,500.00
Rp 40,000.00 Rp 4,000.00
Rp 90,000.00 Rp 9,000.00
Rp 45,000.00 Rp 4,500.00
Rp 30,000.00 Rp 12,000.00
Rp - Rp -
Rp 45,000.00 Rp 4,500.00

Rp 3,172,400.00 Rp 528,733.33
Rp 5,750.00 Rp 8,254.13
Rp 40,000.00 Rp 4,688.00
Rp - Rp -

Rp 165,350.00 Rp 23,975.75
Rp - Rp -
Rp 343,050.00 Rp 24,871.13
Nilai HSPK : Rp 633,322.33

Rp 60,000.00 Rp 1,200.00
Rp 50,000.00 Rp 1,087.50
Rp 55,000.00 Rp 3,987.50
Rp 40,000.00 Rp 2,900.00
Rp 90,000.00 Rp 6,525.00
Rp 45,000.00 Rp 3,262.50
Rp 30,000.00 Rp 8,700.00
Rp - Rp -
Rp 45,000.00 Rp 3,262.50

Rp 1,004,700.00 Rp 167,450.00
Rp 5,750.00 Rp 8,254.13
Rp 40,000.00 Rp 3,398.80
Rp - Rp -

Rp 165,350.00 Rp 23,975.75
Rp - Rp -
Rp 343,050.00 Rp 24,871.13
Nilai HSPK : Rp 258,874.80

Pemerintah Kabupaten Madiun


- 120 -

HARGA
HARGA
SATUAN

Rp 60,000.00 Rp 1,200.00
Rp 50,000.00 Rp 1,087.50
Rp 55,000.00 Rp 3,987.50
Rp 40,000.00 Rp 2,900.00
Rp 90,000.00 Rp 6,525.00
Rp 45,000.00 Rp 3,262.50
Rp 30,000.00 Rp 8,700.00
Rp - Rp -
Rp 45,000.00 Rp 3,262.50

Rp 323,200.00 Rp 323,200.00
Rp 5,750.00 Rp 8,254.13
Rp 40,000.00 Rp 3,398.80
Rp - Rp -

Rp 165,350.00 Rp 2,996.97
Rp - Rp -
Rp 343,050.00 Rp 24,871.13
Nilai HSPK : Rp 393,646.02

Pemerintah Kabupaten Madiun


- 121 -

HARGA
HARGA
SATUAN

Rp 60,000.00 Rp 1,200.00
Rp 50,000.00 Rp 1,087.50
Rp 55,000.00 Rp 13,750.00
Rp 40,000.00 Rp 10,000.00
Rp 90,000.00 Rp 22,500.00
Rp 45,000.00 Rp 11,250.00
Rp 30,000.00 Rp 30,000.00
Rp - Rp -
Rp 45,000.00 Rp 11,250.00

Rp 5,750.00 Rp 28,462.50
Rp 40,000.00 Rp 11,720.00
Rp - Rp -

Rp 165,350.00 Rp 10,334.38
Rp 19,150.00 Rp 14,362.50
Rp 186,850.00 Rp 140,137.50
Rp 343,050.00 Rp 85,762.50
Nilai HSPK : Rp 391,816.88

Rp 55,000.00 Rp 6,875.00
Rp 90,000.00 Rp 11,250.00
Rp 90,000.00 Rp 11,250.00
Rp 30,000.00 Rp 15,000.00
Rp 45,000.00 Rp 5,625.00

Rp 5,750.00 Rp 14,231.25
Rp 40,000.00 Rp 11,720.00
Rp - Rp -

Rp 18,218.00 Rp 6,831.75
Rp 343,050.00 Rp 42,881.25
Nilai HSPK : Rp 125,664.25

Err:509 Err:509
Rp 12,049.00 Rp 1,204,900.00
Rp 168,918.50 Rp 1,689,185.00
Nilai HSPK : Err:509

Pemerintah Kabupaten Madiun


- 122 -

HARGA
HARGA
SATUAN

Err:509 Err:509
Rp 12,049.00 Rp 1,506,125.00
Rp 168,918.50 Rp 1,689,185.00
Nilai HSPK : Err:509

Err:509 Err:509
Rp 12,049.00 Rp 1,204,900.00
Rp 236,180.25 Rp 2,361,802.50
Nilai HSPK : Err:509

Err:509 Err:509
Rp 12,049.00 Rp 1,506,125.00
Rp 236,180.25 Rp 2,361,802.50
Nilai HSPK : Err:509

Pemerintah Kabupaten Madiun


- 123 -

HARGA
HARGA
SATUAN

Err:509 Err:509
Rp 12,049.00 Rp 1,204,900.00
Rp 352,713.00 Rp 3,527,130.00
Nilai HSPK : Err:509

Err:509 Err:509
Rp 12,049.00 Rp 1,506,125.00
Rp 352,713.00 Rp 3,527,130.00
Nilai HSPK : Err:509

Err:509 Err:509
Rp 12,049.00 Rp 1,204,900.00
Rp 360,813.00 Rp 3,608,130.00
Nilai HSPK : Err:509

Err:509 Err:509
Rp 12,049.00 Rp 1,506,125.00
Rp 360,813.00 Rp 3,608,130.00
Nilai HSPK : Err:509

Pemerintah Kabupaten Madiun


- 93 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

NON KONSTRUKSI
J Pertamanan dan Kebersihan
24.10.01 Pertamanan
24.10.01.01 Penyiapan bibit tanaman/ Pemutaran tanaman
m3
(Volume 0.063 m3)
Tenaga:
22.01.01.02.15 Tukang Tanam 0.2000 O.H
22.01.01.03.07 Pekerja Semi Terampil 0.1000 O.H
Peralatan:
02.05.01.03.22.10 Gelangsing 1.0000 Buah
20.03.15.11.02.02 Tali Rafiah 0.1500 Kg
Nilai HSPK :
24.10.01.02 Tanah Taman (Terolah) m3
Tenaga:
22.01.01.01.09 Mandor 0.0100 O.H
22.01.01.03.09 Pekerja Terampil 0.2500 O.H
Bahan:
05.19.03.14.52 Stek Non Lokal 1.0000 btg
Nilai HSPK :
24.10.01.03 Pengapuran dan pengecatan 1 batang pohon Batang
Tenaga:
22.01.01.01.09 Mandor 0.0031 O.H
22.01.01.01.03 Kepala Tukang cat 0.0031 O.H
22.01.01.02.03 Tukang cat 0.0313 O.H
Bahan:
20.01.01.09.02.02 Cat Tembok 0.2500 Kg
20.01.01.09.03.09 Cat kayu Emco 0.0500 Kg
20.01.01.09.04.05 Minyak Cat / Afduner 0.0150 ltr
Nilai HSPK :
24.10.01.04 Membabat/Merapikan Rumput t<20 cm m2
Tenaga:
22.01.01.01.09 Mandor 0.0001 O.H
22.01.01.02.15 Tukang Tanam 0.0100 O.H
22.01.01.03.08 Pekerja Tak Terampil 0.0100 O.H
Nilai HSPK :
24.10.01.05 Membabat/Merapikan Rumput
m2
20cm< t <50 cm
Tenaga:
22.01.01.01.09 Mandor 0.0002 O.H
22.01.01.02.15 Tukang Tanam 0.0200 O.H
22.01.01.03.08 Pekerja Tak Terampil 0.0100 O.H
Nilai HSPK :
24.10.01.06 Membabat/Merapikan Rumput t>50 cm m2
Tenaga:
22.01.01.01.09 Mandor 0.0003 O.H
Pemerintah Kabupaten Madiun
- 94 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

22.01.01.02.15 Tukang Tanam 0.0300 O.H


22.01.01.03.08 Pekerja Tak Terampil 0.0200 O.H
Nilai HSPK :
24.10.01.07 Membabat/Merapikan Rumput t>100 cm m2
Tenaga:
22.01.01.01.09 Mandor 0.0003 O.H
22.01.01.02.15 Tukang Tanam 0.0300 O.H
22.01.01.03.08 Pekerja Tak Terampil 0.0350 O.H
Nilai HSPK :
24.10.01.08 Pemotongan Rumput Tinggi maks 15 cm scr
m2
mekanik dg mobil pemotong
Tenaga:
22.01.01.03.06 Operator 0.0010 O.H
Bahan:
20.02.01.07.06 Solar 0.0550 ltr
20.02.01.08.10 Oil Mesin 0.0020 ltr
Peralatan:
21.02.01.01.24 Mesin Pemotong Dorong 0.0650 unit/hari
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 95 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

24.10.01.09 Pemotongan Rumput Tinggi maks 15 cm scr


m2
mekanik dg Mesin pemotong
Tenaga:
22.01.01.03.06 Operator 0.0050 O.H
Bahan:
20.02.01.07.06 Solar 0.0550 ltr
20.02.01.08.10 Oil Mesin 0.0020 ltr
Peralatan:
21.02.01.01.25 Mesin Pemotong Gendong 0.0850 unit/hari
Nilai HSPK :
24.10.01.10 Pemotongan Rumput Tinggi maks 50 cm scr
m2
mekanik dg Mesin pemotong
Tenaga:
22.01.01.03.06 Operator 0.0050 O.H
Bahan:
20.02.01.07.06 Solar 0.0650 ltr
20.02.01.08.10 Oil Mesin 0.0030 ltr
Peralatan:
21.02.01.01.25 Mesin Pemotong Gendong 0.1050 unit/hari
Nilai HSPK :
24.10.01.11 Menanam Rumput Manila Sistem Tandur m2
Tenaga:
22.01.01.01.09 Mandor 0.0100 O.H
22.01.01.03.08 Pekerja Tak Terampil 0.1500 O.H
Bahan:
05.19.02.05.01.23 Rumput Manila (Golf) t=0,05 m 1.0000 m2
Nilai HSPK :
24.10.01.12 Menanam Rumput Lamur m2
Tenaga:
22.01.01.01.09 Mandor 0.0100 O.H
22.01.01.03.08 Pekerja Tak Terampil 0.1500 O.H
Bahan:
05.19.02.05.01.22 Rumput Lamur (embun) 1.0000 m2
Nilai HSPK :
24.10.01.13 Mengolah Tanah (Mencangkul)
m2
sedalam 30 Cm
Tenaga:
22.01.01.01.09 Mandor 0.0035 O.H
22.01.01.02.15 Tukang Tanam 0.1000 O.H
Nilai HSPK :
24.10.01.14 Ongkos kerja menanam tanaman pagar m2
Tenaga:
22.01.01.01.09 Mandor 0.0050 O.H
22.01.01.02.15 Tukang Tanam 0.1000 O.H
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 96 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

24.10.01.15 Ongkos menanam pohon pelindung t = 1-2 m Batang


Tenaga:
22.01.01.01.09 Mandor 0.0200 O.H
22.01.01.02.15 Tukang Tanam 0.4000 O.H
Nilai HSPK :
24.10.01.16 Ongkos menanam semak hias (15 batang) m2
Tenaga:
22.01.01.01.09 Mandor 0.1000 O.H
22.01.01.02.15 Tukang Tanam 0.3300 O.H
Nilai HSPK :
24.10.01.17 Pemijahan bibit taman (Batang Pohon) Batang
Tenaga:
22.01.01.02.15 Tukang Tanam 0.0400 O.H
22.01.01.03.08 Pekerja Tak Terampil 0.0400 O.H
Bahan:
Tanah Taman 0.0010 m3
05.19.03.14.40 Pupuk Kandang 0.0010 Kg
02.05.02.03.01.07 Kantong Plastik 15 x 22 cm 0.0100 Pak
Nilai HSPK :
24.10.01.18 Penanaman Semak Hias m2
Tenaga:
22.01.01.01.09 Mandor 0.0100 O.H
22.01.01.02.15 Tukang Tanam 0.3300 O.H
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 97 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

24.10.01.19 Pengendalian/Pemberantasan hama semak hias m2


Tenaga:
22.01.01.01.09 Mandor 0.0013 O.H
22.01.01.03.08 Pekerja tak Terampil 0.0040 O.H
Bahan:
05.19.03.14.25 Obat Hama Tanaman (Basudin) 0.0015 Liter
Peralatan:
20.03.05.03.01.09 Ember karet 0.0040 buah
21.02.01.02.10 Sewa Gembor siram 0.0040 unit/hari
21.02.01.02.14 Sewa Hand sprayer 0.0020 unit/hari
Nilai HSPK :
24.10.01.20 Pemupukan semak hias m2
Tenaga:
22.01.01.01.09 Mandor 0.0010 O.H
22.01.01.03.08 Pekerja tak Terampil 0.0059 O.H
Bahan:
05.19.03.14.55 Pupuk Urea 0.0185 Kg
Peralatan:
20.03.05.03.01.09 Ember karet 0.0059 buah
Nilai HSPK :
24.10.01.21 Pendangiran semak hias m2
Tenaga:
22.01.01.01.09 Mandor 0.0014 O.H
22.01.01.03.14 Sopir Terampil 0.0002 O.H
22.01.01.03.09 Pekerja Terampil 0.0080 O.H
Bahan:
20.02.01.07.01 Bensin 0.0028 Liter
Peralatan:
21.02.01.02.06 Cangkul 0.0024 unit/hari
21.02.01.02.26 Sabit besar 0.0024 unit/hari
21.02.03.01.04 Sewa Pickup 0.0002 unit/hari
02.05.02.03.03.03 Keranjang rotan 0.0016 buah
20.01.01.22.09 Batu asah 0.0008 buah
Nilai HSPK :
24.10.02 Pemotongan Pohon
24.10.02.01 Pekerjaan Pangkas Meja, Ada Kabel Listrik, Ø
Pohon
< 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.1667 OH
22.01.01.02.13 Tukang Potong 0.3333 OH
22.01.01.03.08 Tukang Bersih 1.3333 OH
22.01.03.07.07 Sopir Truk 0.3333 OH
22.01.03.07.06 Sopir Skywalker 0.3333 OH
Peralatan:
20.02.01.07.01 Bensin 1.0000 Liter

Pemerintah Kabupaten Madiun


- 98 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

20.02.01.08.07 Oli Rantai 0.3333 Liter


20.02.01.07.06 Solar Truk Doubel 1.5000 Liter
20.02.01.07.06 Solar Skywalker 1.6667 Liter
Nilai HSPK :
24.10.02.02 Pekerjaan Pangkas Meja, Tidak Ada Kabel
Pohon
Listrik, Ø < 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.0833 OH
22.01.01.02.13 Tukang Potong 0.1667 OH
22.01.01.03.08 Tukang Bersih 0.6667 OH
22.01.03.07.07 Sopir Truk 0.1667 OH
22.01.03.07.06 Sopir Skywalker 0.1667 OH
Peralatan:
20.02.01.07.01 Bensin 0.5000 Liter
20.02.01.08.07 Oli Rantai 0.1250 Liter
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter
20.02.01.07.06 Solar Skywalker 0.8333 Liter
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 99 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

24.10.02.03 Pekerjaan Pangkas Meja, Ada Kabel Listrik, Ø


Pohon
> 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.2500 OH
22.01.01.02.13 Tukang Potong 0.5000 OH
22.01.01.03.08 Tukang Bersih 2.0000 OH
22.01.03.07.07 Sopir Truk 0.5000 OH
22.01.03.07.06 Sopir Skywalker 0.5000 OH
Peralatan:
20.02.01.07.01 Bensin 1.5000 Liter
20.02.01.08.07 Oli Rantai 0.1250 Liter
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter
20.02.01.07.06 Solar Skywalker 2.5000 Liter
Nilai HSPK :
24.10.02.04 Pekerjaan Pangkas Meja, Tidak Ada Kabel
Pohon
Listrik, Ø > 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.1250 OH
22.01.01.02.13 Tukang Potong 0.2500 OH
22.01.01.03.08 Tukang Bersih 1.0000 OH
22.01.03.07.07 Sopir Truk 0.2500 OH
22.01.03.07.06 Sopir Skywalker 0.2500 OH
Peralatan:
20.02.01.07.01 Bensin 0.7500 Liter
20.02.01.08.07 Oli Rantai 0.1250 Liter
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter
20.02.01.07.06 Solar Skywalker 1.2500 Liter
Nilai HSPK :
24.10.02.05 Pekerjaan Perantingan , Ada Kabel Listrik, Ø <
Pohon
60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.1000 OH
22.01.01.02.13 Tukang Potong 0.2000 OH
22.01.01.03.08 Tukang Bersih 0.8000 OH
22.01.03.07.07 Sopir Truk 0.2000 OH
22.01.03.07.06 Sopir Skywalker 0.2000 OH
Peralatan:
20.02.01.07.01 Bensin 0.6000 Liter
20.02.01.08.07 Oli Rantai 0.1250 Liter
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter
20.02.01.07.06 Solar Skywalker 1.0000 Liter
Nilai HSPK :
24.10.02.06 Pekerjaan Perantingan, Tidak Ada Kabel
Pohon
Listrik, Ø < 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.0500 OH

Pemerintah Kabupaten Madiun


- 100 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

22.01.01.02.13 Tukang Potong 0.1000 OH


22.01.01.03.08 Tukang Bersih 0.4000 OH
22.01.03.07.07 Sopir Truk 0.1000 OH
22.01.03.07.06 Sopir Skywalker 0.1000 OH
Peralatan:
20.02.01.07.01 Bensin 0.3000 Liter
20.02.01.08.07 Oli Rantai 0.1250 Liter
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter
20.02.01.07.06 Solar Skywalker 0.5000 Liter
Nilai HSPK :
24.10.02.07 Pekerjaan Perantingan, Ada Kabel
Pohon
Listrik, Ø > 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.1667 OH
22.01.01.02.13 Tukang Potong 0.3333 OH
22.01.01.03.08 Tukang Bersih 1.3333 OH
22.01.03.07.07 Sopir Truk 0.3333 OH
22.01.03.07.06 Sopir Skywalker 0.3333 OH
Peralatan:
20.02.01.07.01 Bensin 1.0000 Liter
20.02.01.08.07 Oli Rantai 0.1250 Liter
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter
20.02.01.07.06 Solar Skywalker 1.6667 Liter
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 101 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

24.10.02.08 Pekerjaan Perantingan, Tidak Ada Kabel


Pohon
Listrik, Ø > 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.1000 OH
22.01.01.02.13 Tukang Potong 0.2000 OH
22.01.01.03.08 Tukang Bersih 0.8000 OH
22.01.03.07.07 Sopir Truk 0.2000 OH
22.01.03.07.06 Sopir Skywalker 0.2000 OH
Peralatan:
20.02.01.07.01 Bensin 0.6000 Liter
20.02.01.08.07 Oli Rantai 0.1250 Liter
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter
20.02.01.07.06 Solar Skywalker 1.0000 Liter
Nilai HSPK :
24.10.02.09 Pekerjaan Pemotongan, Ada Kabel
Pohon
Listrik, Ø < 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.2500 OH
22.01.01.02.13 Tukang Potong 0.5000 OH
22.01.01.03.08 Tukang Bersih 2.0000 OH
22.01.03.07.07 Sopir Truk 0.5000 OH
22.01.03.07.06 Sopir Skywalker 0.5000 OH
Peralatan:
20.02.01.07.01 Bensin 1.5000 Liter
20.02.01.08.07 Oli Rantai 0.2500 Liter
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter
20.02.01.07.06 Solar Skywalker 2.5000 Liter
Nilai HSPK :
24.10.02.10 Pekerjaan Pemotongan, Tidak Ada Kabel
Pohon
Listrik, Ø < 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.1250 OH
22.01.01.02.13 Tukang Potong 0.2500 OH
22.01.01.03.08 Tukang Bersih 1.0000 OH
22.01.03.07.07 Sopir Truk 0.2500 OH
22.01.03.07.06 Sopir Skywalker 0.2500 OH
Peralatan:
20.02.01.07.01 Bensin 0.7500 Liter
20.02.01.08.07 Oli Rantai 0.2500 Liter
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter
20.02.01.07.06 Solar Skywalker 1.2500 Liter
Nilai HSPK :
24.10.02.11 Pekerjaan Pemotongan, Ada Kabel
Pohon
Listrik, Ø > 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.5000 OH

Pemerintah Kabupaten Madiun


- 102 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

22.01.01.02.13 Tukang Potong 1.0000 OH


22.01.01.03.08 Tukang Bersih 4.0000 OH
22.01.03.07.07 Sopir Truk 1.0000 OH
22.01.03.07.06 Sopir Skywalker 1.0000 OH
Peralatan:
20.02.01.07.01 Bensin 3.0000 Liter
20.02.01.08.07 Oli Rantai 0.2500 Liter
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter
20.02.01.07.06 Solar Skywalker 5.0000 Liter
Nilai HSPK :
24.10.02.12 Pekerjaan Pemotongan, Tidak Ada Kabel
Pohon
Listrik, Ø > 60 cm
Tenaga:
Koordinator Pemotongan Pohon 0.2500 OH
22.01.01.02.13 Tukang Potong 0.5000 OH
22.01.01.03.08 Tukang Bersih 2.0000 OH
22.01.03.07.07 Sopir Truk 0.5000 OH
22.01.03.07.06 Sopir Skywalker 0.5000 OH
Peralatan:
20.02.01.07.01 Bensin 1.5000 Liter
20.02.01.08.07 Oli Rantai 0.2500 Liter
20.02.01.07.06 Solar Truk Doubel 1.5000 Liter
20.02.01.07.06 Solar Skywalker 2.5000 Liter
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 103 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

24.10.03 Kebersihan
24.10.03.01 Pekerjaan Angkutan Sampah m3
Tenaga:
22.01.01.03.14 Pengemudi / Sopir 0.0185 O.H
22.01.01.03.11 Pembantu Sopir 0.0185 O.H
22.01.01.03.08 Pekerja/Buruh Tak Terampil 0.0556 O.H
Peralatan:
21.02.04.17.02 Masker Plastik 0.0015 buah
21.02.04.17.03 Sarung Tangan 0.0030 buah
21.02.04.17.04 Sepatu boot 0.0005 buah
21.02.04.17.06 Topi Ranger 0.0005 buah
21.02.01.02.29 Sekop 0.0015 Unit/Hari
21.02.04.17.05 Katel pack 0.0010 Buah
02.05.02.01.10.03 Garuk+Gagang 0.0015 buah
02.05.02.03.03.03 Keranjang Rotan 0.0030 buah
21.02.03.01.02 Sewa Truck 0.0093 Jam
20.02.01.07.06 Solar 0.5093 Liter
Nilai HSPK :
24.10.03.02 Pekerjaan Incinerator mini m3
Tenaga:
22.01.01.01.09 Mandor 0.0909 O.H
22.01.01.03.09 Pekerja Terampil 0.0909 O.H
22.01.01.03.08 Pekerja/Buruh Tak Terampil 0.2730 O.H
Peralatan:
21.02.04.17.02 Masker Plastik 0.0150 buah
21.02.04.17.03 Sarung Tangan 0.0598 buah
21.02.04.17.04 Sepatu boot 0.0970 buah
21.02.04.17.05 Katel pack 0.0996 buah
21.02.04.17.06 Topi Ranger 0.0499 buah
21.02.01.02.29 Sekop 0.0100 Unit/Hari
02.05.02.01.10.03 Garuk+Gagang 0.0199 buah
02.05.02.03.03.03 Keranjang Rotan 0.0299 buah
20.02.01.07.02 Minyak Tanah 4.8000 ltr
21.01.05.01.03 Listrik 0.4000 Kwh
21.01.05.01.02 Air 0.1091 m3
02.05.02.01.10.05 Sogrok Besi 0.0199 buah
Nilai HSPK :
24.10.03.03 Pekerjaan Penyapuan m2
Tenaga:
22.01.01.01.08 Kepala Tukang Sapu 0.0002 O.H
22.01.01.02.14 Tukang Sapu 0.0020 O.H
Peralatan:
21.02.04.17.02 Masker Plastik 0.0013 buah
21.02.04.17.03 Sarung Tangan 0.0008 buah
21.02.04.17.04 Sepatu Karet 0.0004 buah

Pemerintah Kabupaten Madiun


- 104 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

21.02.04.17.06 Topi Ranger 0.0004 buah


21.02.04.17.01 Jas Hujan 0.0004 buah
20.03.05.01.01.11 Sapu Lidi + Pegangan 0.0580 buah
02.05.02.03.03.03 Keranjang Rotan 0.0029 buah
02.05.01.03.22.10 Gelangsing 0.0009 buah
21.02.04.17.05 Katelpak 0.0005 Stel
Nilai HSPK :
24.10.03.04 Pekerjaan Incinerator Mini Swasta m3
Tenaga:
22.01.01.01.09 Mandor 0.0636 O.H
22.01.01.03.09 Pekerja Terampil 0.0636 O.H
22.01.01.03.08 Pekerja/Buruh Tak Terampil 0.3818 O.H
Peralatan:
21.02.01.01.19 Sewa Incinerator 1.0000 jam
21.02.04.17.02 Masker Plastik 0.0024 Buah
21.02.04.17.03 Sarung Tangan 0.0060 buah
21.02.04.17.04 Sepatu boot 0.0010 buah
21.02.04.17.05 Katel pack 0.0016 Buah
21.02.04.17.06 Topi Ranger 0.0010 buah
21.02.01.02.29 Sekop 0.0001 Unit/Hari
02.05.02.01.10.03 Garuk+Gagang 0.0003 buah
02.05.02.03.03.03 Keranjang Rotan 0.0003 buah
20.02.01.07.02 Minyak Tanah 4.8000 ltr
21.01.05.01.02 Air 0.1091 m3
20.02.01.07.06 Solar 1.8182 ltr
02.05.02.01.10.05 Sogrok Besi 0.0003 buah
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 105 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

24.10.03.05 Perbaikan Container Sampah (rusak berat) unit


Tenaga:
22.01.01.02.09 Tukang las 8.0000 O.H
22.01.01.03.07 Pekerja Semi Terampil 8.0000 O.H
22.01.01.02.03 Tukang Cat 8.0000 O.H
22.01.01.03.08 Pembantu Tukang Cat dan dempul 8.0000 O.H
Bahan:
20.01.01.13.06 Plat esser 3 mm (120 x 240 cm) 8.0000 m2
20.01.01.13.05 Plat esser 1,2 mm (120 x 240 cm) 28.0000 m2
20.01.01.21.05 Kawat Las 9.0000 Box
20.01.01.09.04.05 Cat Minyak 7.0000 Kg
20.01.01.09.04.08 Thinner 15.0000 Liter
20.01.01.19.02 Amplas 25.0000 Buah
20.01.01.09.05.05 Dempul 15.0000 Kg
Peralatan:
21.02.04.06.03 Sewa Genset 125 48.0000 Set/hari
Nilai HSPK :
24.10.03.06 Perbaikan Gerobak Sampah (rusak berat) unit
Tenaga:
22.01.01.02.09 Tukang las 2.0000 O.H
22.01.01.03.07 Buruh Semi Terampil 2.0000 O.H
22.01.01.02.03 Tukang Cat dan dempul 2.0000 O.H
22.01.01.03.08 Pembantu Tukang Cat dan dempul 2.0000 O.H
Bahan:
20.01.01.13.06 Plat esser 3 mm (120 x 240 cm) 1.0000 m2
20.01.01.13.05 Plat esser 1,2 mm (120 x 240 cm) 2.0000 m2
20.01.01.21.05 Kawat Las 1.5000 Box
20.01.01.09.04.05 Cat Minyak 3.0000 Kg
20.01.01.09.04.08 Thinner 3.0000 Liter
20.01.01.19.02 Amplas 10.0000 Buah
20.01.01.09.05.05 Dempul 3.0000 Kg
Peralatan:
21.02.04.06.01 Sewa Genset 3000 10.0000 Set/hari
Nilai HSPK :
24.10.04 Lingkungan Hidup
24.10.04.01 Perawatan Mangrove 1 Rb /BTG
Tenaga:
22.01.01.01.09 Mandor 0.3000 O.H
22.01.01.02.15 Tukang Tanam 3.0000 OH
Bahan:
20.03.06.10.02 Batteray kecil 16.00 Buah
Err:509 Ajir (2m) 100.00 btg
05.19.03.14.34 Penggantian Tanaman 250.00 btg
05.19.03.14.37 Pupuk daun @ 100 gr 12.00 bks
Peralatan:

Pemerintah Kabupaten Madiun


- 106 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

21.02.03.01.04 Sewa Mobil Pick up 1.00 Unit/Hari


21.02.01.02.27 Sewa Rakit 1.00 Unit/Hari
21.02.01.02.14 Sewa Sprayer 3.00 Unit/Hari
21.02.01.02.07 Sewa Cutter 3.00 Unit/Hari
21.02.01.02.32 Sewa Senter 3.00 Unit/Hari
Nilai HSPK :
24.10.04.02 Penanaman Mangrove 1 Rb /BTG
Tenaga:
22.01.01.01.09 Mandor 0.8000 O.H
22.01.01.02.15 Tukang Tanam 8.0000 O.H
Bahan:
20.03.06.10.02 Batteray kecil 38.0000 Buah
Peralatan:
21.02.01.02.07 Sewa Cutter 8.0000 Unit/Hari
21.02.01.02.32 Sewa Senter 9.0000 Unit/Hari
21.02.01.02.19 Sewa Linggis 8.0000 Unit/Hari
21.02.01.02.27 Sewa Rakit 2.0000 Unit/Hari
21.02.03.01.11 Sewa Truk Kelas I Dlm Kota 0.1500 Unit/Hari
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 107 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

24.10.04.03 Penanaman Mangrove Batang


Tenaga:
22.01.01.01.09 Mandor 0.0008 O.H
22.01.01.02.15 Tukang Tanam 0.0080 O.H
Bahan:
20.03.06.10.02 Batteray kecil 0.0360 Buah
Peralatan:
21.02.01.02.02 Sewa alat bantu 0.0025 Unit
21.02.03.01.09 Sewa Truk Angkut (arm roll 14 m3) 0.0010 Unit/Hari
21.02.01.02.27 Sewa Rakit 0.0020 Unit/Hari
Nilai HSPK :
24.10.04.04 Perawatan Mangrove (Batang Pohon) Batang
Tenaga:
22.01.01.01.09 Mandor 0.0003 O.H
22.01.01.03.09 Pekerja Terampil 0.0030 O.H
Bahan:
05.19.02.03.01.17 Mangrove T. 1M 0.2500 btg
20.03.06.10.02 Batteray kecil 0.0160 Buah
Err:509 Bambu (Ajir) 0.1000 btg
05.19.03.14.37 Pupuk daun 0.0050 bks
Peralatan:
21.02.03.01.04 Sewa Mobil Pick up 0.0010 Hari
21.02.01.02.27 Sewa Rakit 0.0010 Unit/Hari
21.02.01.02.14 Sewa Sprayer 0.0030 Unit/Hari
21.02.01.02.02 Sewa alat bantu 0.0030 Unit
Nilai HSPK :
24.10.05 Pengecatan Mobil
24.10.05.01 Pengecatan Mobil Kijang/Panther, Tanpa Unit
Kerusakan Bodi
Tenaga:
22.01.01.01.03 Kepala Tukang 3.0000 OH
22.01.01.02.03 Tukang Cat Mobil 5.0000 OH
22.01.01.03.08 Tenaga: Tak Terampil 20.0000 OH
Bahan:
20.01.01.09.04.02 Cat 3.0000 Kg
20.01.01.09.04.03 Pernis 3.0000 Kg
20.01.01.09.05.05 Dempul 5.0000 Kg
20.01.01.19.02 Kertas Gosok 25.0000 Lbr
Nilai HSPK :
24.10.05.02 Pengecatan Mobil Kijang/Panther, Unit
Kerusakan Bodi Ringan
Tenaga:
22.01.01.01.03 Kepala Tukang 3.0000 OH
22.01.01.02.03 Tukang Cat Mobil 5.0000 OH
22.01.01.02.09 Tukang Las 10.0000 OH

Pemerintah Kabupaten Madiun


- 108 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

22.01.01.03.08 Tenaga: Tak Terampil 25.0000 OH


Bahan:
20.01.01.09.04.02 Cat 3.0000 Kg
20.01.01.09.04.03 Pernis 3.0000 Kg
20.01.01.09.05.05 Dempul 5.0000 Kg
20.01.01.19.02 Kertas Gosok 30.0000 Lbr
20.01.02.01.36 Oksigen 15.7000 Liter
20.01.01.21.02 Karbit (Asetilin) 4.0000 Kg
20.01.01.13.11 Plat besi 8.4553 Kg
Nilai HSPK :
24.10.05.03 Pengecatan Mobil Kijang/Panther, Kerusakan Unit
Bodi Sedang
Tenaga:
22.01.01.01.03 Kepala Tukang 3.0000 OH
22.01.01.02.03 Tukang Cat Mobil 5.0000 OH
22.01.01.02.09 Tukang Las 15.0000 OH
22.01.01.03.08 Tenaga: Tak Terampil 30.0000 OH
Bahan:
20.01.01.09.04.02 Cat 3.0000 Kg
20.01.01.09.04.03 Pernis 3.0000 Kg
20.01.01.09.05.05 Dempul 5.0000 Kg
20.01.01.19.02 Kertas Gosok 40.0000 Lbr
20.01.02.01.36 Oksigen 15.7000 Liter
20.01.01.21.02 Karbit (Asetilin) 5.0000 Kg
20.01.01.13.11 Plat besi 17.0115 Kg
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 109 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

24.10.05.04 Pengecatan Mobil Kijang/Panther, Kerusakan Unit


Bodi Berat
Tenaga:
22.01.01.01.03 Kepala Tukang 3.0000 OH
22.01.01.02.03 Tukang Cat Mobil 5.0000 OH
22.01.01.02.09 Tukang Las 20.0000 OH
22.01.01.03.08 Tenaga: Tak Terampil 35.0000 OH
Bahan:
20.01.01.09.04.02 Cat 3.0000 Kg
20.01.01.09.04.03 Pernis 3.0000 Kg
20.01.01.09.05.05 Dempul 5.0000 Kg
20.01.01.19.02 Kertas Gosok 50.0000 Lbr
20.01.02.01.36 Oksigen 15.7000 Liter
20.01.01.21.02 Karbit (Asetilin) 6.0000 Kg
20.01.01.13.11 Plat besi 33.8545 Kg
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 110 -

HARGA
HARGA
SATUAN

Rp 90,000.00 Rp 18,000.00
Rp 67,500.00 Rp 6,750.00

Rp - Rp -
Rp 10,550.00 Rp 1,582.50
Nilai HSPK : Rp 26,332.50

Rp 100,000.00 Rp 1,000.00
Rp 70,000.00 Rp 17,500.00

Rp - Rp -
Nilai HSPK : Rp 18,500.00

Rp 100,000.00 Rp 310.00
Rp 95,000.00 Rp 294.50
Rp 90,000.00 Rp 2,812.50

Rp - Rp -
Rp 61,550.00 Rp 3,077.50
Rp 11,700.00 Rp 175.50
Nilai HSPK : Rp 6,670.00

Rp 100,000.00 Rp 10.00
Rp 90,000.00 Rp 900.00
Rp 65,000.00 Rp 650.00
Nilai HSPK : Rp 1,560.00

Rp 100,000.00 Rp 20.00
Rp 90,000.00 Rp 1,800.00
Rp 65,000.00 Rp 650.00
Nilai HSPK : Rp 2,470.00

Rp 100,000.00 Rp 30.00
Pemerintah Kabupaten Madiun
- 111 -

HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 2,700.00
Rp 65,000.00 Rp 1,300.00
Nilai HSPK : Rp 4,030.00

Rp 100,000.00 Rp 30.00
Rp 90,000.00 Rp 2,700.00
Rp 65,000.00 Rp 2,275.00
Nilai HSPK : Rp 5,005.00

Rp 90,000.00 Rp 90.00

Rp 5,750.00 Rp 316.25
Rp - Rp -

Rp 86,650.00 Rp 5,632.25
Nilai HSPK : Rp 6,038.50

Pemerintah Kabupaten Madiun


- 112 -

HARGA
HARGA
SATUAN

Rp 90,000.00 Rp 450.00

Rp 5,750.00 Rp 316.25
Rp - Rp -

Rp 43,350.00 Rp 3,684.75
Nilai HSPK : Rp 4,451.00

Rp 90,000.00 Rp 450.00

Rp 5,750.00 Rp 373.75
Rp - Rp -

Rp 43,350.00 Rp 4,551.75
Nilai HSPK : Rp 5,375.50

Rp 100,000.00 Rp 1,000.00
Rp 65,000.00 Rp 9,750.00

Rp - Rp -
Nilai HSPK : Rp 10,750.00

Rp 100,000.00 Rp 1,000.00
Rp 65,000.00 Rp 9,750.00

Rp - Rp -
Nilai HSPK : Rp 10,750.00

Rp 100,000.00 Rp 350.00
Rp 90,000.00 Rp 9,000.00
Nilai HSPK : Rp 9,350.00

Rp 100,000.00 Rp 500.00
Rp 90,000.00 Rp 9,000.00
Nilai HSPK : Rp 3,300.00

Pemerintah Kabupaten Madiun


- 113 -

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 2,000.00
Rp 90,000.00 Rp 36,000.00
Nilai HSPK : Rp 38,000.00

Rp 100,000.00 Rp 10,000.00
Rp 90,000.00 Rp 29,700.00
Nilai HSPK : Rp 39,700.00

Rp 90,000.00 Rp 3,600.00
Rp 65,000.00 Rp 2,600.00

Rp 129,000.00 Rp 129.00
Rp - Rp -
Rp - Rp -
Nilai HSPK : Rp 6,329.00

Rp 100,000.00 Rp 1,000.00
Rp 90,000.00 Rp 29,700.00
Nilai HSPK : Rp 30,700.00

Pemerintah Kabupaten Madiun


- 114 -

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 130.00
Rp 65,000.00 Rp 260.00

Rp - Rp -

Rp - Rp -
Rp 6,850.00 Rp 27.40
Rp 10,750.00 Rp 21.50
Nilai HSPK : Rp 438.90

Rp 100,000.00 Rp 100.00
Rp 65,000.00 Rp 385.45

Rp - Rp -

Rp - Rp -
Nilai HSPK : Rp 485.45

Rp 100,000.00 Rp 140.00
Rp 90,000.00 Rp 21.60
Rp 70,000.00 Rp 560.00

Rp 7,350.00 Rp 20.58

Rp 4,150.00 Rp 9.96
Rp 15,050.00 Rp 36.12
Rp 391,600.00 Rp 93.98
Rp - Rp -
Rp - Rp -
Nilai HSPK : Rp 882.24

Rp 40,000.00 Rp 6,666.67
Rp 90,000.00 Rp 30,000.00
Rp 65,000.00 Rp 86,666.67
Rp 70,000.00 Rp 23,333.33
Rp 70,000.00 Rp 23,333.33

Rp 7,350.00 Rp 7,350.00

Pemerintah Kabupaten Madiun


- 115 -

HARGA
HARGA
SATUAN
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 9,583.33
Nilai HSPK : Rp 195,558.33

Rp 40,000.00 Rp 3,333.33
Rp 90,000.00 Rp 15,000.00
Rp 65,000.00 Rp 43,333.33
Rp 70,000.00 Rp 11,666.67
Rp 70,000.00 Rp 11,666.67

Rp 7,350.00 Rp 3,675.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 4,791.67
Nilai HSPK : Rp 102,091.67

Pemerintah Kabupaten Madiun


- 116 -

HARGA
HARGA
SATUAN

Rp 40,000.00 Rp 10,000.00
Rp 90,000.00 Rp 45,000.00
Rp 65,000.00 Rp 130,000.00
Rp 70,000.00 Rp 35,000.00
Rp 70,000.00 Rp 35,000.00

Rp 7,350.00 Rp 11,025.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 14,375.00
Nilai HSPK : Rp 289,025.00

Rp 40,000.00 Rp 5,000.00
Rp 90,000.00 Rp 22,500.00
Rp 65,000.00 Rp 65,000.00
Rp 70,000.00 Rp 17,500.00
Rp 70,000.00 Rp 17,500.00

Rp 7,350.00 Rp 5,512.50
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 7,187.50
Nilai HSPK : Rp 148,825.00

Rp 40,000.00 Rp 4,000.00
Rp 90,000.00 Rp 18,000.00
Rp 65,000.00 Rp 52,000.00
Rp 70,000.00 Rp 14,000.00
Rp 70,000.00 Rp 14,000.00

Rp 7,350.00 Rp 4,410.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 5,750.00
Nilai HSPK : Rp 120,785.00

Rp 40,000.00 Rp 2,000.00

Pemerintah Kabupaten Madiun


- 117 -

HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 9,000.00
Rp 65,000.00 Rp 26,000.00
Rp 70,000.00 Rp 7,000.00
Rp 70,000.00 Rp 7,000.00

Rp 7,350.00 Rp 2,205.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 2,875.00
Nilai HSPK : Rp 64,705.00

Rp 40,000.00 Rp 6,666.67
Rp 90,000.00 Rp 30,000.00
Rp 65,000.00 Rp 86,666.67
Rp 70,000.00 Rp 23,333.33
Rp 70,000.00 Rp 23,333.33

Rp 7,350.00 Rp 7,350.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 9,583.33
Nilai HSPK : Rp 195,558.33

Pemerintah Kabupaten Madiun


- 118 -

HARGA
HARGA
SATUAN

Rp 40,000.00 Rp 4,000.00
Rp 90,000.00 Rp 18,000.00
Rp 65,000.00 Rp 52,000.00
Rp 70,000.00 Rp 14,000.00
Rp 70,000.00 Rp 14,000.00

Rp 7,350.00 Rp 4,410.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 5,750.00
Nilai HSPK : Rp 120,785.00

Rp 40,000.00 Rp 10,000.00
Rp 90,000.00 Rp 45,000.00
Rp 65,000.00 Rp 130,000.00
Rp 70,000.00 Rp 35,000.00
Rp 70,000.00 Rp 35,000.00

Rp 7,350.00 Rp 11,025.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 14,375.00
Nilai HSPK : Rp 289,025.00

Rp 40,000.00 Rp 5,000.00
Rp 90,000.00 Rp 22,500.00
Rp 65,000.00 Rp 65,000.00
Rp 70,000.00 Rp 17,500.00
Rp 70,000.00 Rp 17,500.00

Rp 7,350.00 Rp 5,512.50
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 7,187.50
Nilai HSPK : Rp 148,825.00

Rp 40,000.00 Rp 20,000.00

Pemerintah Kabupaten Madiun


- 119 -

HARGA
HARGA
SATUAN
Rp 90,000.00 Rp 90,000.00
Rp 65,000.00 Rp 260,000.00
Rp 70,000.00 Rp 70,000.00
Rp 70,000.00 Rp 70,000.00

Rp 7,350.00 Rp 22,050.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 28,750.00
Nilai HSPK : Rp 569,425.00

Rp 40,000.00 Rp 10,000.00
Rp 90,000.00 Rp 45,000.00
Rp 65,000.00 Rp 130,000.00
Rp 70,000.00 Rp 35,000.00
Rp 70,000.00 Rp 35,000.00

Rp 7,350.00 Rp 11,025.00
Rp - Rp -
Rp 5,750.00 Rp 8,625.00
Rp 5,750.00 Rp 14,375.00
Nilai HSPK : Rp 289,025.00

Pemerintah Kabupaten Madiun


- 120 -

HARGA
HARGA
SATUAN

Rp 90,000.00 Rp 1,666.80
Rp 78,800.00 Rp 1,459.38
Rp 65,000.00 Rp 3,611.40

Rp 2,750.00 Rp 4.18
Rp 2,750.00 Rp 8.36
Rp 6,800.00 Rp 3.47
Rp 6,800.00 Rp 3.47
Rp 13,650.00 Rp 20.48
Rp 67,500.00 Rp 68.18
Rp - Rp -
Rp - Rp -
Rp 280,000.00 Rp 2,592.80
Rp 5,750.00 Rp 2,928.25
Nilai HSPK : Rp 12,366.75

Rp 100,000.00 Rp 9,090.00
Rp 70,000.00 Rp 6,363.00
Rp 65,000.00 Rp 17,745.00

Rp 2,750.00 Rp 41.11
Rp 2,750.00 Rp 164.45
Rp 6,800.00 Rp 659.57
Rp 67,500.00 Rp 6,723.00
Rp 6,800.00 Rp 339.32
Rp 13,650.00 Rp 135.95
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 900.00 Rp 360.00
Rp 3,100.00 Rp 338.21
Rp - Rp -
Nilai HSPK : Rp 41,959.62

Rp 95,000.00 Rp 19.00
Rp 90,000.00 Rp 180.00

Rp 2,750.00 Rp 3.63
Rp 2,750.00 Rp 2.12
Rp 6,800.00 Rp 3.05

Pemerintah Kabupaten Madiun


- 121 -

HARGA
HARGA
SATUAN
Rp 6,800.00 Rp 2.99
Rp 10,200.00 Rp 4.49
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 67,500.00 Rp 33.75
Nilai HSPK : Rp 249.03

Rp 100,000.00 Rp 6,363.64
Rp 70,000.00 Rp 4,454.55
Rp 65,000.00 Rp 24,818.18

Rp 4,778.00 Rp 4,778.00
Rp 2,750.00 Rp 6.58
Rp 2,750.00 Rp 16.45
Rp 6,800.00 Rp 6.60
Rp 67,500.00 Rp 107.60
Rp 6,800.00 Rp 6.78
Rp 13,650.00 Rp 1.36
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 3,100.00 Rp 338.18
Rp 5,750.00 Rp 10,454.55
Rp - Rp -
Nilai HSPK : Rp 51,352.44

Pemerintah Kabupaten Madiun


- 122 -

HARGA
HARGA
SATUAN

Rp 90,000.00 Rp 720,000.00
Rp 65,000.00 Rp 520,000.00
Rp 90,000.00 Rp 720,000.00
Rp 65,000.00 Rp 520,000.00

Rp 242,250.00 Rp 1,938,000.00
Rp 110,000.00 Rp 3,080,000.00
Rp - Rp -
Rp 11,700.00 Rp 81,900.00
Rp 28,600.00 Rp 429,000.00
Rp 5,000.00 Rp 125,000.00
Rp 41,700.00 Rp 625,500.00

Rp 80,412.50 Rp 3,859,800.00
Nilai HSPK : Rp 12,619,200.00

Rp 90,000.00 Rp 180,000.00
Rp 65,000.00 Rp 130,000.00
Rp 90,000.00 Rp 180,000.00
Rp 65,000.00 Rp 130,000.00

Rp 242,250.00 Rp 242,250.00
Rp 110,000.00 Rp 220,000.00
Rp - Rp -
Rp 11,700.00 Rp 35,100.00
Rp 28,600.00 Rp 85,800.00
Rp 5,000.00 Rp 50,000.00
Rp 41,700.00 Rp 125,100.00

Rp 215,575.00 Rp 2,155,750.00
Nilai HSPK : Rp 3,534,000.00

1 Rb /BTG

Rp 100,000.00 Rp 30,000.00
Rp 90,000.00 Rp 270,000.00

Rp 3,000.00 Rp 48,000.00
Err:509 Err:509
Rp - Rp -
Rp - Rp -

Pemerintah Kabupaten Madiun


- 123 -

HARGA
HARGA
SATUAN
Rp 391,600.00 Rp 391,600.00
Rp 27,250.00 Rp 27,250.00
Rp 10,750.00 Rp 32,250.00
Rp 750.00 Rp 2,250.00
Rp 63,000.00 Rp 189,000.00
Nilai HSPK : Err:509
1 Rb /BTG

Rp 100,000.00 Rp 80,000.00
Rp 90,000.00 Rp 720,000.00

Rp 3,000.00 Rp 114,000.00

Rp 750.00 Rp 6,000.00
Rp 63,000.00 Rp 567,000.00
Rp 2,450.00 Rp 19,600.00
Rp 27,250.00 Rp 54,500.00
Rp 757,275.00 Rp 113,591.25
Nilai HSPK : Rp 1,674,691.25

Pemerintah Kabupaten Madiun


- 124 -

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 80.00
Rp 90,000.00 Rp 720.00

Rp 3,000.00 Rp 108.00

Rp 98,400.00 Rp 246.00
Rp 792,000.00 Rp 792.00
Rp 27,250.00 Rp 54.50
Nilai HSPK : Rp 2,000.50

Rp 100,000.00 Rp 30.00
Rp 70,000.00 Rp 210.00

Rp - Rp -
Rp 3,000.00 Rp 48.00
Err:509 Err:509
Rp - Rp -

Rp 391,600.00 Rp 391.60
Rp 27,250.00 Rp 27.25
Rp 10,750.00 Rp 32.25
Rp 98,400.00 Rp 295.20
Nilai HSPK : Err:509

Rp 95,000.00 Rp 285,000.00
Rp 90,000.00 Rp 450,000.00
Rp 65,000.00 Rp 1,300,000.00

Rp 121,000.00 Rp 363,000.00
Rp - Rp -
Rp 41,700.00 Rp 208,500.00
Rp 5,000.00 Rp 125,000.00
Nilai HSPK : Rp 2,731,500.00

Rp 95,000.00 Rp 285,000.00
Rp 90,000.00 Rp 450,000.00
Rp 90,000.00 Rp 900,000.00

Pemerintah Kabupaten Madiun


- 125 -

HARGA
HARGA
SATUAN
Rp 65,000.00 Rp 1,625,000.00

Rp 121,000.00 Rp 363,000.00
Rp - Rp -
Rp 41,700.00 Rp 208,500.00
Rp 5,000.00 Rp 150,000.00
Rp - Rp -
Rp 26,450.00 Rp 105,800.00
Rp 12,750.00 Rp 107,804.44
Nilai HSPK : Rp 4,195,104.44

Rp 95,000.00 Rp 285,000.00
Rp 90,000.00 Rp 450,000.00
Rp 90,000.00 Rp 1,350,000.00
Rp 65,000.00 Rp 1,950,000.00

Rp 121,000.00 Rp 363,000.00
Rp - Rp -
Rp 41,700.00 Rp 208,500.00
Rp 5,000.00 Rp 200,000.00
Rp - Rp -
Rp 26,450.00 Rp 132,250.00
Rp 12,750.00 Rp 216,897.20
Nilai HSPK : Rp 5,155,647.20

Pemerintah Kabupaten Madiun


- 126 -

HARGA
HARGA
SATUAN

Rp 95,000.00 Rp 285,000.00
Rp 90,000.00 Rp 450,000.00
Rp 90,000.00 Rp 1,800,000.00
Rp 65,000.00 Rp 2,275,000.00

Rp 121,000.00 Rp 363,000.00
Rp - Rp -
Rp 41,700.00 Rp 208,500.00
Rp 5,000.00 Rp 250,000.00
Rp - Rp -
Rp 26,450.00 Rp 158,700.00
Rp 12,750.00 Rp 431,644.88
Nilai HSPK : Rp 6,221,844.88

Pemerintah Kabupaten Madiun


- 102 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

24.11.01 Pekerjaan Kemarkaan


24.11.01.01 Pengecatan Marka dan Zebra Cross (mekanis) m2
Tenaga:
22.01.01.01.09 Mandor 0.0220 O.H
22.01.01.02.03 Tukang Cat 0.0440 O.H
22.01.01.03.08 Pekerja / Buruh Tak Terampil 0.0890 O.H
Bahan:
20.01.01.70.11 Thermo Plastic 3.7500 Kg
LPG 0.0440 Kg
20.01.01.70.06 Glass Bit 0.5000 Kg
Peralatan:
21.02.01.02.02 Sewa Alat Bantu 0.0440 Unit
21.02.03.01.03 Flat Bed Truck 0.0440 Jam
Nilai HSPK :
24.11.01.02 Pengecatan Marka dan Zebra Cross (manual) m2
Tenaga:
22.01.01.01.09 Mandor 0.0220 O.H
22.01.01.02.03 Tukang Cat 0.0440 O.H
22.01.01.03.08 Pekerja / Buruh Tak Terampil 0.0890 O.H
Bahan:
20.01.01.09.04.33 Cat marka 3.7500 kg
Peralatan:
21.02.01.02.02 Alat bantu 0.0440 Unit
Nilai HSPK :
24.11.01.03 Pengadaan dan Pemasangan Warning Light 2
Aspek Buah

I. Pengadaan
20.03.06.19.37 Kontroller Lampu Peringatan 1.0000 set
20.03.06.19.10 Box Lampu 3 Aspek LED 20 Cm 2.0000 set
20.03.06.18.01 Tiang Over Head 6.4.3" 1.0000 Batang
20.03.06.19.01 Armatur Box Lampu 4.0000 Buah
20.03.06.19.52 Patok Pengaman 4" BSB 3.0000 Buah
20.03.06.19.64 Terminal Kabel Besar 1.0000 Buah
20.03.06.01.03.03 Kabel NYM 1.5 mm 30.0000 meter
20.03.06.01.11.02 Kabel SR / Twister 50.0000 meter
20.03.06.19.35 Konektor Kabel 4.0000 Buah
20.03.06.19.62 Service Kabel SR 4.0000 Buah
20.03.06.19. Biaya Penyambungan PLN 1.0000 unit
II. Konstruksi Pemasangan
Penggelaran kabel 80.0000 meter
Gali dan Tutup Tanah Keras 2.0000 m3
Pengecoran Tiang Over Head 1.0000 Unit
Pengecoran Patok Pengaman 3.0000 Unit
Pasang dan Stel Box Lampu 1.0000 Unit
Pembuatan dudukan Box Control 1.0000 Buah

Pemerintah Kabupaten Madiun


- 103 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Pengecatan Tiang dan Patok Pengaman 1.0000 Unit

Nilai HSPK :

Pemerintah Kabupaten Madiun


- 104 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

24.11.01.04 Pengadaan Warning Light 3 Aspek Buah


I. Pengadaan
20.03.06.19.37 Kontroller Lampu Peringatan 1.0000 set
20.03.06.19.10 Box Lampu 3 Aspek LED 30 Cm 2.0000 set
20.03.06.18.01 Tiang Over Head 6.4.3" 1.0000 Batang
20.03.06.19.01 Armatur Box Lampu 4.0000 Buah
20.03.06.19.52 Patok Pengaman 4" BSB 3.0000 Buah
20.03.06.19.64 Terminal Kabel Besar 1.0000 Buah
20.03.06.01.03.03 Kabel NYM 1.5 mm 30.0000 meter
20.03.06.01.11.02 Kabel SR / Twister 50.0000 meter
20.03.06.19.35 Konektor Kabel 4.0000 Buah
20.03.06.19.62 Service Kabel SR 4.0000 Buah
20.03.06.19. Biaya Penyambungan PLN 1.0000 unit
20.03.06.19.96 Biaya Programming 1.0000 Buah
II. Konstruksi Pemasangan
Penggelaran kabel 80.0000 meter
Gali dan Tutup Tanah Keras 2.0000 m3
Pengecoran Tiang Over Head 1.0000 Unit
Pengecoran Patok Pengaman 3.0000 Unit
Pasang dan Stel Box Lampu 1.0000 Unit
Pembuatan dudukan Box Control 1.0000 Buah

Pengecatan Tiang dan Patok Pengaman 1.0000 Unit

Nilai HSPK :
24.11.01.05 Pengadaan Traffic Light Tiang Lurus Buah
I. Pengadaan
20.03.06.19.38 Kontroller TLC x1 comp 4 1.0000 Unit
20.03.06.19.10 Box Lampu 3 Aspek LED 30 Cm 10.0000 Unit
20.03.06.19.09 Box Lampu 2 Aspek LED 20 Cm 8.0000 Unit
20.03.06.18.01 Tiang Over Head 6.5.3" 3.0000 Batang
20.03.06.18.02 Tiang Lurus 5", tinggi 2 m 3.0000 Batang
20.03.06.19.01 Armatur Box Lampu 36.0000 Buah
20.03.06.19.52 Patok Pengaman 4" BSB 24.0000 Buah
20.03.06.19.64 Terminal Kabel 10.0000 Buah
20.03.06.01.04.50 Kabel NYY 4 x 2.5 mm 420.00 m
20.03.06.01.04.23 Kabel NYY 2 x 4 mm 40.0000 m
20.03.06.19.103 Pipa BSB 1" 2.0000 Batang
20.01.01.05.06 Pasir Urug 3.0000 m3
20.03.06.19.56 Rambu Tabel 1 plus Pengaman 4.0000 set
20.03.06.19. Biaya Penyambungan PLN 1.0000 Unit
II. Konstruksi Pemasangan
Penggelaran Kabel 460.00 m
Pemasangan Pipa PVC 200.00 m
Boring Bawah Aspal 68.0000 m3
Gali dan Tutup Tanah Keras 70.0000 m3
Pengecoran Tiang Over Head 3.0000 Buah
Pemerintah Kabupaten Madiun
- 105 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Pengecoran Tiang Lurus 3.0000 Buah


Pengecoran Tiang Patok Pengaman 24.0000 Buah
Pasang dan Stel Box Lampu 18.0000 Buah
Pembuatan Dudukan Box Lampu 1.0000 set
Pasang dan Stel 1 pesawat Kontroller 1.0000 Buah

Pengecatan Tiang dan Patok Pengaman 1.0000 Unit

24.11.01.01 Pengecatan Marka dan Zebra Cross 66.0000 m2


20.03.06.19.96 Biaya Programming 1.0000 Buah
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 106 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

24.11.01.06 Pengadaan Traffic Light Tiang Lengkung Buah


I. Pengadaan
20.03.06.19.38 Kontroller TLC x1 comp 4 1.0000 Unit
20.03.06.19.10 Box Lampu 3 Aspek LED 30 Cm 10.0000 Unit
20.03.06.19.09 Box Lampu 2 Aspek LED 20 Cm 8.0000 Unit
20.03.06.18.01 Tiang Over Head 6.5.3" 3.0000 Batang
20.03.06.18.02 Tiang Lengkung 5", tinggi 3.5 m 3.0000 Batang
20.03.06.19.01 Armatur Box Lampu 36.0000 Buah
20.03.06.19.52 Patok Pengaman 4" BSB 24.0000 Buah
20.03.06.19.64 Terminal Kabel 10.0000 Buah
20.03.06.01.04.50 Kabel NYY 4 x 2.5 mm 420.00 m
20.03.06.01.04.23 Kabel NYY 2 x 4 mm 40.00 m
20.03.06.19.103 Pipa BSB 1" 2.0000 Batang
20.01.01.05.06 Pasir Urug 3.0000 m3
20.03.06.19.56 Rambu Tabel 1 plus Pengaman 4.0000 set
20.03.06.19. Biaya Penyambungan PLN 1.0000 Unit
II. Konstruksi Pemasangan
Penggelaran Kabel 460.00 m
Pemasangan Pipa PVC 200.00 m
Boring Bawah Aspal 68.0000 m
Gali dan Tutup Tanah Keras 70.0000 m
Pengecoran Tiang Over Head 3.0000 Buah
Pengecoran Tiang Lurus 3.0000 Buah
Pengecoran Tiang Patok Pengaman 24.0000 Buah
Pasang dan Stel Box Lampu 18.0000 Buah
Pembuatan Dudukan Box Lampu 1.0000 set
Pasang dan Stel 1 pesawat Kontroller 1.0000 Buah

Pengecatan Tiang dan Patok Pengaman 1.0000 Unit

24.11.01.01 Pengecatan Marka dan Zebra Cross 66.0000 m2


20.03.06.19.96 Biaya Programming 1.0000 Unit
Nilai HSPK :
24.11.01.07 Pembuatan & Pemasangan Rambu Lalu Lintas
(Uk. diameter 60 CM ) dr Plat Alumunium 2 MM Unit
dgn SCOTCHLIGHT serta Plat Tambahan:
Tenaga:
22.01.01.01.09 Mandor 0.5000 OH
22.01.01.03.08 Pekerja / Buruh tak terampil 3.5000 OH
Bahan:
20.01.01.18.04 Plat Almunium teb. 2 mm 0.0485 M2
20.01.01.70.07 Pemantul / Scotch Light Putih 0.3850 M2
20.01.01.09.04.33 Cat Warna Scotch Light 0.1720 kg
20.05.06.02.06 Pipa Galvanis 1,5 " Medium B 3.0000 M
20.01.01.13.11 Plat Strip Uk. 3 x 40 mm 0.7500 kg
20.01.01.13.10 Plat Siku L. 20 x 20 x 2 0.2500 kg
Err:509 Pondasi Umpak Beton K-225 0.1120 m3

Pemerintah Kabupaten Madiun


- 107 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

Peralatan:
21.02.01.02.02 Sewa Alat Bantu 0.0850 Unit
Pengangkutan Rambu ke Lokasi 1.0000 Unit
Nilai HSPK:

Pemerintah Kabupaten Madiun


- 108 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

24.11.01.08 Pembuatan & Pemasangan Rambu Lalu Lintas


(Uk. diameter 70 CM ) dr Plat Almunium 2 MM Unit
dgn SCOTCHLIGHT serta Plat Tambahan:
Tenaga:
22.01.01.01.09 Mandor 0.5000 OH
22.01.01.03.08 Pekerja / Buruh tak terampil 3.5000 OH
Bahan:
20.01.01.18.04 Plat Almunium teb. 2 mm 0.2150 M2
20.01.01.70.07 Pemantul / Scotch Light Putih 0.3150 M2
20.01.01.09.04.33 Tinta Warna Scotch Light 0.8500 kg
20.05.06.02.02 Pipa Galvanis 2 " Medium B 3.0000 M
20.01.01.13.11 Plat Strip Uk. 3 x 40 mm 0.5000 kg
20.01.01.13.10 Plat Siku L. 20 x 20 x 2 0.3000 kg
Err:509 Pondasi Umpak Beton K-225 0.0805 M3
Peralatan:
21.02.01.02.02 Sewa Alat Bantu 0.0750 unit
Pengangkutan Rambu ke Lokasi 1.0000 Unit
Nilai HSPK:
24.11.01.09 Pengadaan dan Pemasangan Pagar Pengaman
Buah
Jalan 4 m
20.01.01.13.02 Lempengan Besi Baja Profil Desain
1.0000 kg
Galvanis
20.01.01.14.01.10 Tiang Penyangga Besi Struktur
45.7500 Kg
Pengendali
20.01.01.61.12 Besi Pengikat Baja Profil Desain 3.0000 Kg
20.01.01.24.10 Mur Baut Beam 12 x 25 mm 10.0000 Buah
20.01.01.24.13 Mur Baut Blocking 12 x 25 mm 3.0000 Buah
20.01.01.24.11 Mur Baut Post 16 x 48 mm 3.0000 Buah
20.01.01.14.05.06 Besi Angkur 30 x 30 x 3 mm 2.2500 meter
20.03.06.19.63 Terminal End (Sleeve Beam) 2.0000 Buah
24.01.02.20 Galian Tanah Urug Kembali 1.6800 m3
24.01.02.17 Urugan Tanah di bawah Pasir 0.2000 m3
24.03.01.02 Bekisting Pondasi 5.8500 m3
24.03.01.16 Cor Pondasi Beton 0.6100 m3
Ongkos Angkut ke Lokasi 1.0000 Buah
Nilai HSPK :
24.11.01.10 Pengadaan dan Pemasangan Paku Jalan (Uk.
Buah
10 x 10 x 2 Cm)
20.01.01.18.01 Alluminium Alloy (10 x 10 x 2 cm) 1.0000 Buah
20.03.06.19.57 Reflektor 2.0000 Buah
20.01.01.34.15 Lem mixed Epoxy Adhesive 0.1300 kg
Pengeboran dan Pemasangan Paku
1.0000 Buah
Jalan
Ongkos Angkut ke Lokasi 0.0020 Buah
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 109 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

24.11.01.11 Pengadaan dan Pemasangan Paku Jalan (Uk.


Buah
10 x 12 x 2 Cm)
20.01.01.18.01 Alluminium Alloy 10 x 12 x 2 cm) 1.0000 Buah
20.03.06.19.57 Reflektor 2.0000 Buah
20.01.01.34.15 Lem mixed Epoxy Adhesive 0.1300 kg
Pengeboran dan Pemasangan Paku
1.0000 Buah
Jalan
Ongkos Angkut ke Lokasi 0.0150 Buah
Nilai HSPK :

Pemerintah Kabupaten Madiun


- 110 -

NOMOR URAIAN KEGIATAN Koef. SATUAN

24.03.02.23 Pekerjaan Pintu Rumah Pompa Unit


Bahan:
20.01.01.13.02 Besi UNP 120 80.4000 Kg
20.05.06.02.02 Pipa Galvanis 2" 117.0000 Kg
20.01.01.13.10 Besi Siku 4 x 4 x 400 cm 6.0000 Kg
20.01.01.14.01.10 Besi Beton 16 21.5680 Kg
20.01.01.13.08 Plat Esser 2 mm 65.0000 Kg
20.01.01.13.11 Plat Strip 50 x 3 0.2400 Kg
20.01.01.13.10 Besi Plat 7.0000 Kg
20.01.01.21.01 Elektroda Baja (20 %) 3.0000 Kg
Upah:
24.03.02.01 Ongkos kerja Pabrikasi dan 300.2080 Kg
Pemasangan Baja
Nilai HSPK :
24.03.02.24 Pekerjaan Pintu Pagar Rumah Pompa M2
Tenaga:
22.01.01.01.09 Mandor 0.0250 OH
22.01.01.02.09 Tukang Las 0.0250 OH
22.01.01.03.08 Pekerja / Buruh tak terampil 0.2500 OH
Bahan:
20.05.06.02.06 Pipa Galvanis 1,5" 2.7300 m1
20.05.06.02.01 Pipa Galvanis 1" 2.5260 m1
20.01.01.61.13 Kawat Loket tbl 2 mm 1.0500 M2
Peralatan:
21.02.01.01.33 Sewa Welding 0.2500 Jam
21.02.01.02.02 Sewa Alat Bantu 0.0500 Unit
Nilai HSPK :

WAKIL BUPA

Drs. ISWAN

Pemerintah Kabupaten Madiun


- 111 -

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 2,200.00
Rp 90,000.00 Rp 3,960.00
Rp 65,000.00 Rp 5,785.00

Rp - Rp -
Rp 77,000.00 Rp 3,388.00
Rp - Rp -

Rp 98,400.00 Rp 4,329.60
Rp 251,750.00 Rp 11,077.00
Nilai HSPK : Rp 30,739.60

Rp 100,000.00 Rp 2,200.00
Rp 90,000.00 Rp 3,960.00
Rp 65,000.00 Rp 5,785.00

Rp - Rp -

Rp 98,400.00 Rp 4,329.60
Nilai HSPK : Rp 16,274.60

Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 8,500.00 Rp 255,000.00
Rp 16,000.00 Rp 800,000.00
Rp - Rp -
Rp - Rp -
Rp - Rp -

Rp 100.00 Rp 8,000.00
Rp 40,000.00 Rp 80,000.00
Rp 100,000.00 Rp 100,000.00
Rp 60,000.00 Rp 180,000.00
Rp 15,000.00 Rp 15,000.00
Rp 140,000.00 Rp 140,000.00

Pemerintah Kabupaten Madiun


- 112 -

HARGA
HARGA
SATUAN

Rp 26,850.00 Rp 26,850.00

Nilai HSPK : Rp 1,604,850.00

Pemerintah Kabupaten Madiun


- 113 -

HARGA
HARGA
SATUAN

Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 8,500.00 Rp 255,000.00
Rp 16,000.00 Rp 800,000.00
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -

Rp 100.00 Rp 8,000.00
Rp 40,000.00 Rp 80,000.00
Rp 100,000.00 Rp 100,000.00
Rp 60,000.00 Rp 180,000.00
Rp 15,000.00 Rp 15,000.00
Rp 140,000.00 Rp 140,000.00

Rp 26,850.00 Rp 26,850.00

Nilai HSPK : Rp 1,604,850.00

Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 23,000.00 Rp 9,660,000.00
Rp 21,000.00 Rp 840,000.00
Rp - Rp -
Rp 134,250.00 Rp 402,750.00
Rp - Rp -
Rp - Rp -

Rp 100.00 Rp 46,000.00
Rp 1,000.00 Rp 200,000.00
Rp 32,500.00 Rp 2,210,000.00
Rp 40,000.00 Rp 2,800,000.00
Rp 100,000.00 Rp 300,000.00
Pemerintah Kabupaten Madiun
- 114 -

HARGA
HARGA
SATUAN
Rp 80,000.00 Rp 240,000.00
Rp 60,000.00 Rp 1,440,000.00
Rp 15,000.00 Rp 270,000.00
Rp 140,000.00 Rp 140,000.00
Rp 165,000.00 Rp 165,000.00

Rp 26,850.00 Rp 26,850.00

Rp 30,739.60 Rp 2,028,813.60
Rp - Rp -
Nilai HSPK : Rp 20,769,413.60

Pemerintah Kabupaten Madiun


- 115 -

HARGA
HARGA
SATUAN

Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 23,000.00 Rp 9,660,000.00
Rp 21,000.00 Rp 840,000.00
Rp - Rp -
Rp 134,250.00 Rp 402,750.00
Rp - Rp -
Rp - Rp -

Rp 100.00 Rp 46,000.00
Rp 1,000.00 Rp 200,000.00
Rp 32,500.00 Rp 2,210,000.00
Rp 40,000.00 Rp 2,800,000.00
Rp 100,000.00 Rp 300,000.00
Rp 80,000.00 Rp 240,000.00
Rp 60,000.00 Rp 1,440,000.00
Rp 15,000.00 Rp 270,000.00
Rp 140,000.00 Rp 140,000.00
Rp 165,000.00 Rp 165,000.00

Rp 26,850.00 Rp 26,850.00

Rp 30,739.60 Rp 2,028,813.60
Rp - Rp -
Nilai HSPK : Rp 20,769,413.60

Rp 100,000.00 Rp 50,000.00
Rp 65,000.00 Rp 227,500.00

Rp 584,700.00 Rp 28,357.95
Rp - Rp -
Rp - Rp -
Rp 25,091.67 Rp 75,275.00
Rp 12,750.00 Rp 9,562.50
Rp 12,750.00 Rp 3,187.50
Err:509 Err:509

Pemerintah Kabupaten Madiun


- 116 -

HARGA
HARGA
SATUAN

Rp 98,400.00 Rp 8,364.00
Rp 12,000.00 Rp 12,000.00
Nilai HSPK: Err:509

Pemerintah Kabupaten Madiun


- 117 -

HARGA
HARGA
SATUAN

Rp 100,000.00 Rp 50,000.00
Rp 65,000.00 Rp 227,500.00

Rp 584,700.00 Rp 125,710.50
Rp - Rp -
Rp - Rp -
Rp 793,500.00 Rp 2,380,500.00
Rp 12,750.00 Rp 6,375.00
Rp 12,750.00 Rp 3,825.00
Err:509 Err:509

Rp 98,400.00 Rp 7,380.00
Rp 12,000.00 Rp 12,000.00
Nilai HSPK: Err:509

Rp 13,000.00 Rp 13,000.00

Rp 10,500.00 Rp 480,375.00

Rp 19,550.00 Rp 58,650.00
Rp - Rp -
Rp - Rp -
Err:509 Err:509
Rp 18,100.00 Rp 40,725.00
Rp - Rp -
Rp 53,415.00 Rp 89,737.20
Rp 182,980.00 Rp 36,596.00
Rp 217,738.00 Rp 1,273,767.30
Rp 851,801.93 Rp 519,599.18
Rp 100,000.00 Rp 100,000.00
Nilai HSPK : Err:509

Rp 73,900.00 Rp 73,900.00
Rp - Rp -
Rp - Rp -

Rp 50,000.00 Rp 50,000.00

Rp 100,000.00 Rp 200.00
Nilai HSPK : Rp 124,100.00

Pemerintah Kabupaten Madiun


- 118 -

HARGA
HARGA
SATUAN

Rp 73,900.00 Rp 73,900.00
Rp - Rp -
Rp - Rp -

Rp 50,000.00 Rp 50,000.00

Rp 100,000.00 Rp 1,500.00
Nilai HSPK : Rp 125,400.00

Pemerintah Kabupaten Madiun


- 119 -

HARGA
HARGA
SATUAN

Rp 13,000.00 Rp 1,045,200.00
Rp 66,125.00 Rp 7,736,625.00
Rp 12,750.00 Rp 76,500.00
Rp 10,500.00 Rp 226,464.00
Rp 16,783.33 Rp 1,090,916.67
Rp 12,750.00 Rp 3,060.00
Rp 12,750.00 Rp 89,250.00
Rp 67,150.00 Rp 201,450.00

Rp 869.65 Rp 261,075.89

Nilai HSPK : Rp 10,730,541.55

Rp 100,000.00 Rp 2,500.00
Rp 90,000.00 Rp 2,250.00
Rp 65,000.00 Rp 16,250.00

Rp 25,091.67 Rp 68,500.25
Rp 674,000.00 Rp 1,702,524.00
Rp 13,100.00 Rp 13,755.00

Rp 1,518,350.00 Rp 379,587.50
Rp 98,400.00 Rp 4,920.00
Nilai HSPK : Rp 2,190,286.75

WAKIL BUPATI MADIUN,

Drs. ISWANTO, M.Si.

Pemerintah Kabupaten Madiun


PERUBAHAN HARGA BARANG DAN BAHAN BANGUNAN / KONSTRUKSI

TAHUN 2008

KODE
NO NAMA BARANG MERK / UKURAN SATUAN
BARANG
1 2 3 4 5
20 BARANG PERSEDIAAN DAN BARANG PAKAI HABIS
20.01 BARANG PAKAI HABIS
20.01.01 BAHAN BANGUNAN DAN KONSTRUKSI
20.01.01.01. Aspal
4 20.01.01.01.04 Aspal Aspal Curah Kg
5 20.01.01.01.05 Aspal Aspal Bitumen Kg
20.01.01.02. Semen
3 20.01.01.02.03 Semen Gresik 40 Kg zak
4 20.01.01.02.04 Semen Gresik 50 Kg zak
20.01.01.08. Baja
1 20.01.01.08.01 Baja Plat Siku Kg
2 20.01.01.08.02 Baja Baja WF/ Profil/ INP/ H.Beam Kg
3 20.01.01.08.03 Baja Plat Strip Kg
20.01.01.12. Besi
16 20.01.01.12.16 Besi Beton, polos Kg
17 20.01.01.12.17 Besi Beton, Ulir Kg
20.01.05. BAHAN BAKU
20.01.05.01. Kawat
2 20.01.05.01.02 Kawat Kawat Berduri m'
3 20.01.05.01.03 Kawat Kawat Beton Kg
20.01.05.02 Kayu
1 20.01.05.02.01 Kayu Bengkirai Balok m3
2 20.01.05.02.02 Kayu Bengkirai Papan m3
3 20.01.05.02.03 Kayu Bengkirai Usuk m3
16 20.01.05.02.16 Kayu Kamper Balok 6 x 12 x 400cm m3
17 20.01.05.02.17 Kayu Kamper Kaso 5 x 7 x 400cm m3
18 20.01.05.02.18 Kayu Kamper Papan 2 x 20 x 400cm m3
19 20.01.05.02.19 Kayu Kamper Reng 2 x 3 x 400cm m3
20 20.01.05.02.20 Kayu Kruing Balok 6 x 12 x 400cm m3
21 20.01.05.02.21 Kayu Kruing Kaso 5 x 7 x 400cm m3
22 20.01.05.02.22 Kayu Kruing Papan 2 x 20 x 400cm m3
23 20.01.05.02.23 Kayu Kruing Reng 2 x 3 x 400cm m3
24 20.01.05.02.24 Kayu Meranti Balok 6 x 12 x 400Cm m3
25 20.01.05.02.25 Kayu Meranti Kaso 5 x 7 x 400Cm m3
26 20.01.05.02.26 Kayu Meranti Papan 2 x 20 x 400Cm m3
27 20.01.05.02.27 Kayu Meranti Reng 2 x 3 x 400Cm m3
20.05.06 PIPA PVC/UPVC
20.05.06.01 Pipa PVC
85 20.05.06.01.85 Pipa PVC Dia 2" S-12,5 @ 6m Batang
20.05.06.02 Pipa Galvanis (Air Tuang)
1 20.05.06.02.01 Pipa Galvanis dia 1/2" @ 6m Batang

120
KODE
NO NAMA BARANG MERK / UKURAN SATUAN
BARANG
2 20.05.06.02.02 Pipa Galvanis dia 3/4" @ 6m Batang
3 20.05.06.02.03 Pipa Galvanis dia 1" @ 6m Batang
4 20.05.06.02.04 Pipa Galvanis dia 1 1/2" @ 6m Batang
5 20.05.06.02.05 Pipa Galvanis dia 2" @ 6m Batang
6 20.05.06.02.06 Pipa Galvanis dia 2 1/2" @ 6m Batang
7 20.05.06.02.07 Pipa Galvanis dia 3" @ 6m Batang
8 20.05.06.02.08 Pipa Galvanis dia 4" @ 6m Batang
9 20.05.06.02.09 Pipa Galvanis dia 6" @ 6m Batang
10 20.05.06.02.10 Pipa Galvanis dia 8" @ 6m Batang
20.01.04. BAHAN BAKAR DAN PELUMAS
20.01.04.01. Bahan Bakar Minyak
1 20.01.04.01.01 Bensin / Premium ltr
2 20.01.04.01.02 Solar ltr
Pompa Turbin & Submersible

Pompa Turbin Kap. 30 Brand Rovatti (Complit dg


1 02.02.03.05.02.01 Unit
Ltr/dt Head 40 m Acessoris dan Perlengkapan)

Brand Southern Franklin Type


Pompa Submersible Kap.
2 02.02.03.05.01.51 SJ60-6 (Complit dg Acessoris dan Unit
15 Ltr/Dt Head 50 m
Perlengkapan)

Brand Southern Franklin Type


Pompa Submersible Kap.
3 02.02.03.05.01.01 SJ60-6 (Complit dg Acessoris dan Unit
20 Ltr/Dt Head 50 m
Perlengkapan)

Mesin Penggerak Daya 32


4 02.02.03.05.02.02 Deutz Engine Type F3L-912 Unit
HP untuk Pompa Turbin

Generator Set Kap. 27,5 Deutz EngineType F3L-912 dg


5 02.02.01.11.08..34 Unit
KVA 3P / 380 Stamford Type BCI 184 F

121
KONSTRUKSI

HARGA
SATUAN
6

7,700
8,100

48,300
59,000

14,750
15,900
15,200

12,900
13,200

3,500
12,700

6,254,000
6,077,000
5,723,000
6,555,500
5,900,000
6,268,750
5,654,100
6,145,800
5,689,200
6,047,500
5,408,300
4,302,000
3,540,000
4,056,250
3,441,600

115,700

165,200

122
HARGA
SATUAN
247,800
324,500
385,800
678,500
890,900
1,091,500
1,476,100
2,100,400
2,478,000

6,000
5,500

133,731,000

118,440,000

137,820,000

126,000,000

157,800,000

123
DAFTAR ANALISA STANDAR BELANJA
PEMBANGUNAN DAN REHABILITASI BANGUNA
DAN PENDOPO
26.08.01 Pembangunan Gedung

NO JENIS PEKERJAAN Koeff SAT.

26.08.01.01 Pembangunan Gedung Type A M2


I PEK. PENDAHULUAN
20.01.01.64.01.05 Pek. Persiapan 0.006557377 Ls
25.01.01.02 Pembuatan bouwplank/uietzet 0.462295082 M

II PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.174688525 M³
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.196721311 Ttk
25.01.02.13 Urugan tanah kembali 0.043672131 M³
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.03042623 M³
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.050819672 M³

III PEK. BETON STRUKTUR


25.03.01.24 Pas. sloof 20/25 0.044262295 M³
25.03.01.16 Pas. kolom praktis 15/15 0.022491148 M³
25.03.01.16 Pas. kolom pendek 20/20 0.003777049 M³
25.03.01.28 Pas. ring balok 15/15 0.026557377 M³
25.03.01.33 Pek. beton rabatan t = 5 cm 0.065652459 M³
25.03.01.28 Pek. balok lantai 0.003836066 M³
25.03.01.28 Pek. Beton Pondasi Setempat 80x80 cm2, tb = 25 cm 0.03147541 M³
25.03.01.28 Pek. pengecoran strouss pile 1 Pc : 1,5 Ps : 2,5 Kr 0.041733021 M³
25.03.01.33 Pek. Lantai Kerja 0.0116 M³
25.03.01.28 Pek Plat Level 0.0073 M³

IV PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.6859 M²
25.04.01.30 Pek. Plesteran halus 5.3718 M²
25.04.01.38 Pek. benangan 1.9148 M¹
25.02.01.12 Pek. pondasi batu kali 0.0813 M³
25.02.01.20 Pas. aanstamping t = 20 cm 0.0494 M³

V PEK. LANTAI
25.05.01.11 Pas. Lantai marmer 0.9820 M²
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.1364 M²
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.0344 M²
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.1646 M²
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.0689 M¹
VI PEK. DAUN PINTU,JENDELA DAN KUSEN
25.07.01.04 Pas. daun pintu teakwood rangka ky. kamper 0.0771 M²
25.07.01.04 Pas. daun pintu kaca rangka ky. kamper 0.0204 M²
25.07.01.47 Pas. kaca mati tb = 5 mm 0.1034 M²
25.07.01.11 Pas. jendela diatas daun pintu/jendela 0.0585 M²
dan bouvenlist ( kaca selipan )
25.07.01.02 Pas. kusen ky kamper 0.0150 M³

VII PEK. ATAP


25.06.02.03 Pas. genteng Kr. pilang/wisma 1.6458 M²
25.06.01.01 Pas. kuda - kuda Ky. kamper 8/12 0.0128 M³
25.06.01.07 Pas. pengapit kuda - kuda + jurai 6/12 0.0075 M³
25.06.01.07 Pas. gording kamper 8/12 0.0132 M²
25.06.01.06 Pas. reng jati Usuk ky. Kamper 1.6458 M³
25.06.02.12 Pas. bumbungan kr pilang/wisma 0.2426 M¹
25.06.02.32 Pas Listplank Kayu Jati 3 / 30 cm 0.4508 M¹
25.06.02.18 Pek. talang jurai 0.0656 M¹

VIII PEK. PLAFOND


25.06.03.17 Pas. Plafond Kalsiboard Rangka Aluminium 1.5984 M²
25.06.03.06 Pas. list plafond 1.6295 M¹

IX PEK. PENGECATAN
25.04.02.18 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.0309 M²
25.04.02.22 Pek. pengecatan dinding 5.3718 M²
25.04.02.21 Pek. pengecatan plafond 1.5984 M²
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.1950 M²
25.04.02.16 Pek. koltir rangka atap 1.6458 M²
25.04.02.12 Pek. meni rangka plafond 1.5984 M²
X PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.0721 Unit
25.07.01.22 Pas. engsel kuningan untuk pintu 0.1082 Stel
25.07.01.21 Pas. engsel kuningan untuk jendela 0.0787 Stel
25.07.01.32 Pas. hak angin lurus 0.0393 Bh
25.07.01.24 Pas. grendel kecil biasa 0.1508 Bh

XI PEK. INSTALASI LISTRIK


25.07.02.02 Pas. titik lampu 0.1246 Ttk
25.07.02.02 Pas. lampu TL 20 watt 0.1049 Bh
B.20.03.06.02.26.07 Pas. lampu pijar 10 watt 0.0197 Bh
B.24.01.02.05.023 Pas. MCB 0.0066 Bh
25.07.02.01 Pas. stop kontak 0.0787 Ttk
25.07.02.03 Pas. saklar tunggal 0.0787 Bh
25.07.02.04 Pas. saklar ganda 0.0131 Bh

XII Pekerjaan Sanitasi Air Kotor (Septictank + Resapan) Unit


25.01.02.07 Pek Galian tanah 0.0407 M³
25.01.02.16 Pek Urugan pasir 0.0014 M³
25.04.01.12 Pas. batu merah 0.1130 M²
25.07.03.08 Pek. pelat penutup beton 0.0033 M³
25.04.01.30 Pek. Plesteran halus 0.1130 M²
25.07.05.08 Pas Pipa 4 " 0.0098 M¹

XIII Tandon Air (1.2 x 2.2 x 1.20) Unit


25.01.02.07 Pek Galian tanah 0.0234 M³
25.03.02.03 Pek Pelat besi penutup tandon 0.0259 kg
25.05.01.01 Pek Keramik 20x20 bagian dalam 0.0619 M²
25.01.02.16 Pek Urugan pasir 0.0017 M³
25.03.01.36 Pek Lantai kerja 0.0009 M³
Pek beton 0.0062 M³

XIV PEK. INSTALASI AIR


25.07.03.23 Pas. wastafel warna 0.0393 Unit
B.08.03.05.07.02 Pas. pompa air 0.0066 Unit
25.07.03.19 Pas. kran air 0.0525 Bh
25.07.03.30 Instalasi air bersih 0.3279 M¹
25.07.03.31 Instalasi air kotor 0.1639 M¹
25.07.03.22 Pas. kloset duduk 0.0131 Bh
25.07.03.24 Pas. avour 0.0131 Bh
25.07.03.24 Pas. floor drain 0.0131 Bh
25.07.01.46 Pas. pintu PVC KM/WC 0.0131 Bh

XII PEK. LAIN-LAIN


22.04.03.01.02.08 Air kerja 0.0066 Ls
20.01.01.64.02.06 Pembersihan akhir 0.0066 Ls
26.08.01.02 Pembangunan Gedung Type B M2
I PEK. PENDAHULUAN
20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls
25.01.01.02 Pembuatan bouwplank/uietzet 0.4623 M

II PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.1747 M³
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.1967 Ttk
25.01.02.13 Urugan tanah kembali 0.0437 M³
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.0304 M³
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.0508 M³

III PEK. BETON STRUKTUR


25.03.01.24 Pas. sloof 20/25 0.0443 M³
25.03.01.16 Pas. kolom praktis 15/15 0.0225 M³
25.03.01.16 Pas. kolom pendek 20/20 0.0038 M³
25.03.01.28 Pas. ring balok 15/15 0.0266 M³
25.03.01.33 Pek. beton rabatan t = 5 cm 0.0657 M³
25.03.01.28 Pek. balok lantai 0.0038 M³
25.03.01.28 Pek. Beton Pondasi Setempat 80x80 cm2, tb = 25 cm 0.0315 M³
25.03.01.28 Pek. pengecoran strouss pile 1 Pc : 1,5 Ps : 2,5 Kr 0.0417 M³
25.03.01.33 Pek. Lantai Kerja 0.0116 M³
25.03.01.28 Pek Plat Level 0.0073 M³

IV PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.6859 M²
25.04.01.30 Pek. Plesteran halus 5.3718 M²
25.04.01.38 Pek. benangan 1.9148 M¹
25.02.01.12 Pek. pondasi batu kali 0.0813 M³
25.02.01.20 Pas. aanstamping t = 20 cm 0.0494 M³

V PEK. LANTAI
25.05.01.04 Pas. keramik lantai 30 x 30 cm ( Motif ) 0.9820 M²
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.1364 M²
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.0344 M²
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.1646 M²
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.0689 M¹

VI PEK. DAUN PINTU,JENDELA DAN KUSEN


25.07.01.04 Pas. daun pintu teakwood rangka ky. kamper 0.0771 M²
25.07.01.04 Pas. daun pintu kaca rangka ky. kamper 0.0204 M²
25.07.01.13 Pas. kaca mati tb = 5 mm 0.1034 M²
25.07.01.11 Pas. jendela diatas daun pintu/jendela 0.0585 M²
dan bouvenlist ( kaca selipan )
25.07.01.02 Pas. kusen ky kamper 0.0150 M³

VII PEK. ATAP


25.06.02.03 Pas. genteng Kr. pilang/wisma 1.6458 M²
25.06.01.02 Pas. kuda - kuda Ky. kamper 8/12 0.0128 M³
25.06.01.07 Pas. pengapit kuda - kuda + jurai 6/12 0.0075 M³
25.06.01.07 Pas. gording kamper 8/12 0.0132 M²
25.06.01.04 Pas. reng kamper Usuk ky. kamper 1.6458 M³
25.06.02.12 Pas. bumbungan kr pilang/wisma 0.2426 M¹
25.06.02.33 Pas. listplank ky papan 3 x 30 cm 0.4508 M¹
25.06.02.18 Pek. talang jurai 0.0656 M¹

VIII PEK. PLAFOND


25.06.03.07 Pas. plafond eternit rangka ky kamper 1.5984 M²
25.06.03.06 Pas. list plafond 1.6295 M¹

IX PEK. PENGECATAN
25.04.02.21 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.0309 M²
25.04.02.10 Pek. pengecatan dinding 5.3718 M²
25.04.02.21 Pek. pengecatan plafond 1.5984 M²
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.1950 M²
25.04.02.16 Pek. koltir rangka atap 1.6458 M²
25.04.02.12 Pek. meni rangka plafond 1.5984 M²

X PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.0721 Unit
25.07.01.22 Pas. engsel kuningan untuk pintu 0.1082 Stel
25.07.01.21 Pas. engsel kuningan untuk jendela 0.0787 Stel
25.07.01.32 Pas. hak angin lurus 0.0393 Bh
25.07.01.24 Pas. grendel kecil biasa 0.1508 Bh

XI PEK. INSTALASI LISTRIK


25.07.02.02 Pas. titik lampu 0.1246 Ttk
25.07.02.02 Pas. lampu TL 20 watt 0.1049 Bh
B.20.03.06.02.26.07 Pas. lampu pijar 10 watt 0.0197 Bh
B.24.01.02.05.023 Pas. MCB 0.0066 Bh
25.07.02.01 Pas. stop kontak 0.0787 Ttk
25.07.02.03 Pas. saklar tunggal 0.0787 Bh
25.07.02.04 Pas. saklar ganda 0.0131 Bh
XII Pekerjaan Sanitasi Air Kotor (Septictank + Resapan) Unit
25.01.02.07 Pek Galian tanah 0.0407 M³
25.01.02.16 Pek Urugan pasir 0.0014 M³
25.04.01.12 Pas. batu merah 0.1130 M²
25.07.03.08 Pek. pelat penutup beton 0.0033 M³
25.04.01.30 Pek. Plesteran halus 0.1130 M²
25.07.05.08 Pas Pipa 4 " 0.0098 M¹

XIII Tandon Air (1.2 x 2.2 x 1.20) Unit


25.01.02.07 Pek Galian tanah 0.0234 M³
25.03.02.03 Pek Pelat besi penutup tandon 0.0259 kg
25.05.01.01 Pek Keramik 20x20 bagian dalam 0.0619 M²
25.01.02.16 Pek Urugan pasir 0.0017 M³
25.03.01.36 Pek Lantai kerja 0.0009 M³
Pek beton 0.0062 M³

XIV PEK. INSTALASI AIR


25.07.03.23 Pas. wastafel warna 0.0393 Unit
B.08.03.05.07.02 Pas. pompa air 0.0066 Unit
25.07.03.19 Pas. kran air 0.0525 Bh
25.07.03.30 Instalasi air bersih 0.3279 M¹
25.07.03.31 Instalasi air kotor 0.1639 M¹
25.07.03.22 Pas. kloset duduk 0.0131 Bh
25.07.03.24 Pas. avour 0.0131 Bh
25.07.03.24 Pas. floor drain 0.0131 Bh
25.07.01.46 Pas. pintu PVC KM/WC 0.0131 Bh

XII PEK. LAIN-LAIN


22.04.03.01.02.08 Air kerja 0.0066 Ls
20.01.01.64.02.06 Pembersihan akhir 0.0066 Ls

26.08.01.03 Pembangunan Gedung Type C M2


I PEK. PENDAHULUAN
20.01.01.64.01.05 Pek. Persiapan 0.006557377 Ls
25.01.01.02 Pembuatan bouwplank/uietzet 0.462295082 M

II PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.174688525 M³
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.196721311 Ttk
25.01.02.13 Urugan tanah kembali 0.043672131 M³
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.03042623 M³
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.050819672 M³

III PEK. BETON STRUKTUR


25.03.01.24 Pas. sloof 20/25 0.044262295 M³
25.03.01.16 Pas. kolom praktis 15/15 0.022491148 M³
25.03.01.16 Pas. kolom pendek 20/20 0.003777049 M³
25.03.01.28 Pas. ring balok 15/15 0.026557377 M³
25.03.01.33 Pek. beton rabatan t = 5 cm 0.065652459 M³
25.03.01.28 Pek. balok lantai 0.003836066 M³
25.03.01.28 Pek. Beton Pondasi Setempat 80x80 cm2, tb = 25 cm 0.03147541 M³
25.03.01.28 Pek. pengecoran strouss pile 1 Pc : 1,5 Ps : 2,5 Kr 0.041733021 M³
25.03.01.33 Pek. Lantai Kerja 0.011557377 M³
25.03.01.28 Pek Plat Level 0.007344262 M³

IV PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.685901639 M²
25.04.01.30 Pek. Plesteran halus 5.371803279 M²
25.04.01.38 Pek. benangan 1.914754098 M¹
25.02.01.12 Pek. pondasi batu kali 0.081295082 M³
25.02.01.20 Pas. aanstamping t = 20 cm 0.049442623 M³

V PEK. LANTAI
25.05.01.03 Pas. keramik lantai 30 x 30 cm ( Motif ) 0.981967213 M²
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.136393443 M²
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.03442623 M²
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.164590164 M²
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.068852459 M¹
VI PEK. DAUN PINTU,JENDELA DAN KUSEN
25.07.01.05 Pas. daun pintu triplek rangka ky. kamper 0.077114754 M²
25.07.01.05 Pas. daun pintu kaca rangka ky. kamper 0.020380328 M²
25.07.01.13 Pas. kaca mati tb = 5 mm 0.103403279 M²
25.07.01.11 Pas. jendela diatas daun pintu/jendela 0.058478689 M²
dan bouvenlist ( kaca selipan ) 0
25.07.01.02 Pas. kusen ky kamper 0.015016131 M³

VII PEK. ATAP


25.06.02.01 Pas. genteng jawa 1.645803279 M²
25.06.01.02 Pas. kuda - kuda Ky. meranti 8/12 0.012841967 M³
25.06.01.07 Pas. pengapit kuda - kuda + jurai 6/12 0.007535213 M³
25.06.01.07 Pas. gording kamper 8/12 0.01323541 M²
25.06.01.05 Pas. reng kamper Usuk ky. kamper 1.645803279 M³
25.06.02.11 Pas. Wuwungan genteng jawa 0.242622951 M¹
25.06.02.33 Pas. listplank ky papan 3 x 30 cm 0.450819672 M¹
25.06.02.18 Pek. talang jurai 0.06557377 M¹

VIII PEK. PLAFOND


25.06.03.04 Pas. plafond eternit rangka ky kamper 1.598360656 M²
25.06.03.06 Pas. list plafond 1.629508197 M¹

IX PEK. PENGECATAN
25.04.02.21 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.030870033 M²
25.04.02.10 Pek. pengecatan dinding 5.371803279 M²
25.04.02.21 Pek. pengecatan plafond 1.598360656 M²
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.194990164 M²
25.04.02.16 Pek. koltir rangka atap 1.645803279 M²
25.04.02.12 Pek. meni rangka plafond 1.598360656 M²

X PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.072131148 Unit
25.07.01.22 Pas. engsel kuningan untuk pintu 0.108196721 Stel
25.07.01.21 Pas. engsel kuningan untuk jendela 0.078688525 Stel
25.07.01.32 Pas. hak angin lurus 0.039344262 Bh
25.07.01.24 Pas. grendel kecil biasa 0.150819672 Bh

XI PEK. INSTALASI LISTRIK


25.07.02.02 Pas. titik lampu 0.124590164 Ttk
25.07.02.02 Pas. lampu TL 20 watt 0.104918033 Bh
B.20.03.06.02.26.07 Pas. lampu pijar 10 watt 0.019672131 Bh
B.24.01.02.05.023 Pas. MCB 0.006557377 Bh
25.07.02.01 Pas. stop kontak 0.078688525 Ttk
25.07.02.03 Pas. saklar tunggal 0.078688525 Bh
25.07.02.04 Pas. saklar ganda 0.013114754 Bh

XII Pekerjaan Sanitasi Air Kotor (Septictank + Resapan)


25.01.02.07 Pek Galian tanah 0.040735363 M³
25.01.02.16 Pek Urugan pasir 0.001357845 M³
25.04.01.12 Pas. batu merah 0.112974239 M²
25.07.03.08 Pek. pelat penutup beton 0.003258829 M³
25.04.01.30 Pek. Plesteran halus 0.112974239 M²
25.07.05.08 Pas Pipa 4 " 0.009836066 M¹

XIII Tandon Air (1.2 x 2.2 x 1.20) Unit


25.01.02.07 Pek Galian tanah 0.023370492 M³
25.03.02.03 Pek Pelat besi penutup tandon 0.025901639 kg
25.05.01.01 Pek Keramik 20x20 bagian dalam 0.061901639 M²
25.01.02.16 Pek Urugan pasir 0.001731148 M³
25.03.01.36 Pek Lantai kerja 0.000865574 M³
Pek beton 0.006190164 M³

XIV PEK. INSTALASI AIR


25.07.03.23 Pas. wastafel warna 0.039344262 Unit
B.08.03.05.07.02 Pas. pompa air 0.006557377 Unit
25.07.03.19 Pas. kran air 0.052459016 Bh
25.07.03.30 Instalasi air bersih 0.327868852 M¹
25.07.03.31 Instalasi air kotor 0.163934426 M¹
25.07.03.22 Pas. kloset jongkok 0.013114754 Bh
25.07.03.24 Pas. avour 0.013114754 Bh
25.07.03.24 Pas. floor drain 0.013114754 Bh
25.07.01.46 Pas. pintu PVC KM/WC 0.013114754 Bh
XII PEK. LAIN-LAIN
22.04.03.01.02.08 Air kerja 0.006557377 Ls
20.01.01.64.02.06 Pembersihan akhir 0.006557377 Ls

26.08.02 Pembangunan Pendopo

NO JENIS PEKERJAAN Koeff SAT.

26.08.02.01 Pembangunan Pendopo M2


I PEK. PERSIAPAN
20.01.01.64.01.05 Pek. Persiapan 0.01 Ls
25.01.01.01 Pembuatan bouwplank/uietzet 0.08 Ttk

II PEK. TANAH
25.02.01.24 Pembuatan Lubang Strous Pile diameter 30 cm 0.04 Ttk
25.01.02.07 Galian Tanah 0.468 M³
25.01.02.13 Urugan Tanah Kembali 0.22596 M³
25.01.02.16 Pengurugan Pasir (PADAT) 0.1542 M³
25.01.02.17 Pengurugan Sirtu (PADAT) 0.3987 M³

III PEK. PASANGAN


25.02.01.11 Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 3 Ps) 0.21504 M³
25.04.01.30 Plesteran Halus 1 Pc : 4 Ps tebal 1,5 cm 1.1365 M³
25.04.01.38 Pasang Benangan 2.98 M

III PEK. BETON STRUKTUR


25.03.01.23 Pekerjaan Beton Rabat (1 Pc : 3 Ps : 6 Kr) 0.075264 M³
25.04.01.30 Plesteran Halus 1 Pc : 4 Ps tebal 1,5 cm 0.0405 M³
Beton Bertulang 1 Pc : 1.5 Ps : 2.5 Kr (K350) dengan
25.03.01.19 Pemakaian Besi 160 kg 0.13544 M³
25.03.01.17 Pekerjaan Beton Bertulang Strous Pile 0
(1 Pc : 1,5 Ps : 2,5 Kr, untuk besi 130 kg) 0.011314286 M³

IV PEK. LANTAI
25.05.01.06 Pas. keramik lantai 40 x 40 cm ( Motif ) 1.4336 M²

IV PEK. PEMBESIAN
25.03.02.05 Pekerjaan Besi WF 150x100x7x10 6.9802425 Kg
25.03.02.03 Pekerjaan Besi Plat Tebal 2 mm 1.1740032 Kg
B.20.01.01.44.06 Baut 22 mm 3.6 Bh
B.20.01.01.62.02 Angker 0.8 Bh

V PEK. ATAP + Plafond


25.06.01.04 Pemasangan Reng kamper/Usuk kamper 2.115 M2
25.06.02.03 Pemasangan Genteng Karang Pilang / Wisma 2.115 M2
25.06.02.12 Pemasangan Wuwung Genteng Karang Pilang 0.43 M¹
25.06.02.33 Pemasangan Listplank Kayu Kamper 3 / 30 cm 0.498 M¹
25.06.01.07 Pas. gording kamper 8/12 0.02845056 M³
25.06.03.02 Pas. plafond eternit rangka ky kamper 2.142 M2
25.06.03.06 Pas. list plafond 2.88 M¹

VI PEK. PENGECATAN, PENGANTUNG


25.04.02.12 Pengecatan Dasar (cat meni) 2.49408 M²
25.04.02.16 Pekerjaan Ter Kayu (rangka atap) 2.115 M²
25.04.02.21 Pek. pengecatan kayu 0.35208 M²
25.04.02.21 Pengecatan Plafond 2.142 M²
25.04.02.10 Pengecatan Tembok (balok dan kolom) 1.1365 M²

VII PEK. INSTALASI LISTRIK


25.07.02.02 Pas. titik lampu 0.05 Ttk
20.03.06.02.21.65 Pas. lampu TL 20 watt 0.04 Bh
Pas Lampu Gantung 0.01 Ls
25.07.02.01 Pas. stop kontak 0.02 Ttk
25.07.02.04 Pas. saklar ganda 0.02 Bh

VIII PEK. LAIN-LAIN


22.04.03.01.02.08 Air kerja 0.01 Ls
20.01.01.64.02.06 Pembersihan akhir 0.01 Ls
26.08.03 Rehabilitasi Bangunan Type A

NO JENIS PEKERJAAN Koeff SAT.


26.08.03.01 Rehabilitasi Pondasi Bangunan Type A M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.1747 M³
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.1967 Ttk
25.01.02.13 Urugan tanah kembali 0.0437 M³
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.0304 M³
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.0508 M³

26.08.03.02 Rehabilitasi Struktur Beton Bangunan Type A M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. BETON STRUKTUR


25.03.01.24 Pas. sloof 20/25 0.0443 M³
25.03.01.16 Pas. kolom praktis 15/15 0.0225 M³
25.03.01.16 Pas. kolom pendek 20/20 0.0038 M³
25.03.01.28 Pas. ring balok 15/15 0.0266 M³
25.03.01.33 Pek. beton rabatan t = 5 cm 0.0657 M³
25.03.01.28 Pek. balok lantai 0.0038 M³
25.03.01.28 Pek. Beton Pondasi Setempat 80x80 cm2, tb = 25 cm 0.0315 M³
25.03.01.28 Pek. pengecoran strouss pile 1 Pc : 1,5 Ps : 2,5 Kr 0.0417 M³
25.03.01.33 Pek. Lantai Kerja 0.0116 M³
25.03.01.28 Pek Plat Level 0.0073 M³

26.08.03.03 Rehabilitasi Pekerjaan Pasangan Bangunan Type A M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.6859 M²
25.04.01.30 Pek. Plesteran halus 5.3718 M²
25.04.01.38 Pek. benangan 1.9148 M¹
25.02.01.12 Pek. pondasi batu kali 0.0813 M³
25.02.01.20 Pas. aanstamping t = 20 cm 0.0494 M³

26.08.03.04 Rehabilitasi Lantai Bangunan Type A M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. LANTAI
25.05.01.11 Pas. Lantai marmer 0.9820 M²
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.1364 M²
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.0344 M²
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.1646 M²
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.0689 M¹

26.08.03.05 Rehabilitasi Daun Pintu,Jendela dan Kusen Bangunan Type A M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. DAUN PINTU,JENDELA DAN KUSEN


25.07.01.04 Pas. daun pintu teakwood rangka ky. kamper 0.0771 M²
25.07.01.04 Pas. daun pintu kaca rangka ky. kamper 0.0204 M²
25.07.01.47 Pas. kaca mati tb = 5 mm 0.1034 M²
25.07.01.11 Pas. jendela diatas daun pintu/jendela 0.0585 M²
dan bouvenlist ( kaca selipan ) 0.0000
25.07.01.02 Pas. kusen ky kamper 0.0150 M³
26.08.03.06 Rehabilitasi Atap Bangunan Type A M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. ATAP
25.06.02.03 Pas. genteng Kr. pilang/wisma 1.6458 M²
25.06.01.01 Pas. kuda - kuda Ky. kamper 8/12 0.0128 M³
25.06.01.07 Pas. pengapit kuda - kuda + jurai 6/12 0.0075 M³
25.06.01.07 Pas. gording kamper 8/12 0.0132 M²
25.06.01.06 Pas. reng jati Usuk ky. Kamper 1.6458 M³
25.06.02.12 Pas. bumbungan kr pilang/wisma 0.2426 M¹
25.06.02.32 Pas Listplank Kayu Jati 3 / 30 cm 0.4508 M¹
25.06.02.18 Pek. talang jurai 0.0656 M¹

26.08.03.07 Rehabilitasi Plafond Bangunan Type A M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. PLAFOND
25.06.03.17 Pas. Plafond Kalsiboard Rangka Aluminium 1.5984 M²
25.06.03.06 Pas. list plafond 1.6295 M¹

26.08.03.08 Rehabilitasi Pengecatan Bangunan Type A M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. PENGECATAN
25.04.02.18 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.0309 M²
25.04.02.22 Pek. pengecatan dinding 5.3718 M²
25.04.02.21 Pek. pengecatan plafond 1.5984 M²
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.1950 M²
25.04.02.16 Pek. koltir rangka atap 1.6458 M²
25.04.02.12 Pek. meni rangka plafond 1.5984 M²

26.08.03.09 Rehabilitasi Pekerjaan Penggantung Bangunan Type A M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.0721 Unit
25.07.01.22 Pas. engsel kuningan untuk pintu 0.1082 Stel
25.07.01.21 Pas. engsel kuningan untuk jendela 0.0787 Stel
25.07.01.32 Pas. hak angin lurus 0.0393 Bh
25.07.01.24 Pas. grendel kecil biasa 0.1508 Bh

26.08.03.10 Rehabilitasi Instalasi Listrik Bangunan Type A M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. INSTALASI LISTRIK


25.07.02.02 Pas. titik lampu 0.1246 Ttk
25.07.02.02 Pas. lampu TL 20 watt 0.1049 Bh
B.20.03.06.02.26.07 Pas. lampu pijar 10 watt 0.0197 Bh
B.24.01.02.05.023 Pas. MCB 0.0066 Bh
25.07.02.01 Pas. stop kontak 0.0787 Ttk
25.07.02.03 Pas. saklar tunggal 0.0787 Bh
25.07.02.04 Pas. saklar ganda 0.0131 Bh

26.08.03.11 Rehabilitasi Septictank & Resapan Bangunan Type A M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

Pekerjaan Sanitasi Air Kotor (Septictank + Resapan) Unit


25.01.02.07 Pek Galian tanah 0.0407 M³
25.01.02.16 Pek Urugan pasir 0.0014 M³
25.04.01.12 Pas. batu merah 0.1130 M²
25.07.03.08 Pek. pelat penutup beton 0.0033 M³
25.04.01.30 Pek. Plesteran halus 0.1130 M²
25.07.05.08 Pas Pipa 4 " 0.0098 M¹
26.08.03.12 Rehabilitasi Tandon Air (1.2x2.2x1.2) Bangunan Type A M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

Tandon Air (1.2 x 2.2 x 1.20) Unit


25.01.02.07 Pek Galian tanah 0.0234 M³
25.03.02.03 Pek Pelat besi penutup tandon 0.0259 kg
25.05.01.01 Pek Keramik 20x20 bagian dalam 0.0619 M²
25.01.02.16 Pek Urugan pasir 0.0017 M³
25.03.01.36 Pek Lantai kerja 0.0009 M³
25.03.01.16 Pek beton 0.0062 M³

26.08.03.12 Rehabilitasi Instalasi Air Bangunan Type A M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. INSTALASI AIR


25.07.03.23 Pas. wastafel warna 0.0393 Unit
B.08.03.05.07.02 Pas. pompa air 0.0066 Unit
25.07.03.19 Pas. kran air 0.0525 Bh
25.07.03.30 Instalasi air bersih 0.3279 M¹
25.07.03.31 Instalasi air kotor 0.1639 M¹
25.07.03.22 Pas. kloset duduk 0.0131 Bh
25.07.03.24 Pas. avour 0.0131 Bh
25.07.03.24 Pas. floor drain 0.0131 Bh
25.07.01.46 Pas. pintu PVC KM/WC 0.0131 Bh

26.08.04 Rehabilitasi Bangunan Type B

NO JENIS PEKERJAAN Koeff SAT.


26.08.04.01 Rehabilitasi Pondasi Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.1747 M³
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.1967 Ttk
25.01.02.13 Urugan tanah kembali 0.0437 M³
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.0304 M³
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.0508 M³

26.08.04.02 Rehabilitasi Struktur Beton Bangunan Type B M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. BETON STRUKTUR


25.03.01.24 Pas. sloof 20/25 0.0443 M³
25.03.01.16 Pas. kolom praktis 15/15 0.0225 M³
25.03.01.16 Pas. kolom pendek 20/20 0.0038 M³
25.03.01.28 Pas. ring balok 15/15 0.0266 M³
25.03.01.33 Pek. beton rabatan t = 5 cm 0.0657 M³
25.03.01.28 Pek. balok lantai 0.0038 M³
25.03.01.28 Pek. Beton Pondasi Setempat 80x80 cm2, tb = 25 cm 0.0315 M³
25.03.01.28 Pek. pengecoran strouss pile 1 Pc : 1,5 Ps : 2,5 Kr 0.0417 M³
25.03.01.33 Pek. Lantai Kerja 0.0116 M³
25.03.01.28 Pek Plat Level 0.0073 M³

26.08.04.03 Rehabilitasi Pekerjaan Pasangan Bangunan Type B M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.6859 M²
25.04.01.30 Pek. Plesteran halus 5.3718 M²
25.04.01.38 Pek. benangan 1.9148 M¹
25.02.01.12 Pek. pondasi batu kali 0.0813 M³
25.02.01.20 Pas. aanstamping t = 20 cm 0.0494 M³
26.08.04.04 Rehabilitasi Lantai Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. LANTAI
25.05.01.04 Pas. keramik lantai 30 x 30 cm ( Motif ) 0.9820 M²
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.1364 M²
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.0344 M²
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.1646 M²
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.0689 M¹

26.08.04.05 Rehabilitasi Daun Pintu,Jendela dan Kusen Bangunan Type B M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. DAUN PINTU,JENDELA DAN KUSEN


25.07.01.04 Pas. daun pintu teakwood rangka ky. kamper 0.0771 M²
25.07.01.04 Pas. daun pintu kaca rangka ky. kamper 0.0204 M²
25.07.01.13 Pas. kaca mati tb = 5 mm 0.1034 M²
25.07.01.11 Pas. jendela diatas daun pintu/jendela 0.0585 M²
dan bouvenlist ( kaca selipan )
25.07.01.02 Pas. kusen ky kamper 0.0150 M³

26.08.04.06 Rehabilitasi Atap Bangunan Type B M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. ATAP
25.06.02.03 Pas. genteng Kr. pilang/wisma 1.6458 M²
25.06.01.02 Pas. kuda - kuda Ky. kamper 8/12 0.0128 M³
25.06.01.07 Pas. pengapit kuda - kuda + jurai 6/12 0.0075 M³
25.06.01.07 Pas. gording kamper 8/12 0.0132 M²
25.06.01.04 Pas. reng kamper Usuk ky. kamper 1.6458 M³
25.06.02.12 Pas. bumbungan kr pilang/wisma 0.2426 M¹
25.06.02.33 Pas. listplank ky papan 3 x 30 cm 0.4508 M¹
25.06.02.18 Pek. talang jurai 0.0656 M¹

26.08.04.07 Rehabilitasi Plafond Bangunan Type B M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. PLAFOND
25.06.03.07 Pas. plafond eternit rangka ky kamper 1.5984 M²
25.06.03.06 Pas. list plafond 1.6295 M¹

26.08.04.08 Rehabilitasi Pengecatan Bangunan Type B M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. PENGECATAN
25.04.02.21 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.0309 M²
25.04.02.10 Pek. pengecatan dinding 5.3718 M²
25.04.02.21 Pek. pengecatan plafond 1.5984 M²
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.1950 M²
25.04.02.16 Pek. koltir rangka atap 1.6458 M²
25.04.02.12 Pek. meni rangka plafond 1.5984 M²

26.08.04.09 Rehabilitasi Pekerjaan Penggantung Bangunan Type B M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.0721 Unit
25.07.01.22 Pas. engsel kuningan untuk pintu 0.1082 Stel
25.07.01.21 Pas. engsel kuningan untuk jendela 0.0787 Stel
25.07.01.32 Pas. hak angin lurus 0.0393 Bh
25.07.01.24 Pas. grendel kecil biasa 0.1508 Bh
26.08.04.10 Rehabilitasi Instalasi Listrik Bangunan Type B M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. INSTALASI LISTRIK


25.07.02.02 Pas. titik lampu 0.1246 Ttk
25.07.02.02 Pas. lampu TL 20 watt 0.1049 Bh
B.20.03.06.02.26.07 Pas. lampu pijar 10 watt 0.0197 Bh
B.24.01.02.05.023 Pas. MCB 0.0066 Bh
25.07.02.01 Pas. stop kontak 0.0787 Ttk
25.07.02.03 Pas. saklar tunggal 0.0787 Bh
25.07.02.04 Pas. saklar ganda 0.0131 Bh

26.08.04.11 Rehabilitasi Septictank & Resapan Bangunan Type B M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

Pekerjaan Sanitasi Air Kotor (Septictank + Resapan) Unit


25.01.02.07 Pek Galian tanah 0.0407 M³
25.01.02.16 Pek Urugan pasir 0.0014 M³
25.04.01.12 Pas. batu merah 0.1130 M²
25.07.03.08 Pek. pelat penutup beton 0.0033 M³
25.04.01.30 Pek. Plesteran halus 0.1130 M²
25.07.05.08 Pas Pipa 4 " 0.0098 M¹

26.08.04.12 Rehabilitasi Tandon Air (1.2x2.2x1.2) Bangunan Type B M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

Tandon Air (1.2 x 2.2 x 1.20) Unit


25.01.02.07 Pek Galian tanah 0.0234 M³
25.03.02.03 Pek Pelat besi penutup tandon 0.0259 kg
25.05.01.01 Pek Keramik 20x20 bagian dalam 0.0619 M²
25.01.02.16 Pek Urugan pasir 0.0017 M³
25.03.01.36 Pek Lantai kerja 0.0009 M³
25.03.01.16 Pek beton 0.0062 M³

26.08.04.13 Rehabilitasi Instalasi Air Bangunan Type B M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. INSTALASI AIR


25.07.03.23 Pas. wastafel warna 0.0393 Unit
B.08.03.05.07.02 Pas. pompa air 0.0066 Unit
25.07.03.19 Pas. kran air 0.0525 Bh
25.07.03.30 Instalasi air bersih 0.3279 M¹
25.07.03.31 Instalasi air kotor 0.1639 M¹
25.07.03.22 Pas. kloset duduk 0.0131 Bh
25.07.03.24 Pas. avour 0.0131 Bh
25.07.03.24 Pas. floor drain 0.0131 Bh
25.07.01.46 Pas. pintu PVC KM/WC 0.0131 Bh

26.08.05 Rehabilitasi Bangunan Type C

NO JENIS PEKERJAAN Koeff SAT.


26.08.05.01 Rehabilitasi Pondasi Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. TANAH
25.01.02.07 Galian pondasi batu kali + poer plat 0.1747 M³
25.02.01.23 Galian tanah lubang strouss pile d = 20 cm, h = 3 m 0.1967 Ttk
25.01.02.13 Urugan tanah kembali 0.0437 M³
25.01.02.16 Urugan pasir bawah pondasi batu kali t = 10 cm 0.0304 M³
25.01.02.16 Pek. urugan pasir bawah keramik t = 5 cm 0.0508 M³
26.08.05.02 Rehabilitasi Struktur Beton Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. BETON STRUKTUR


25.03.01.24 Pas. sloof 20/25 0.0443 M³
25.03.01.16 Pas. kolom praktis 15/15 0.0225 M³
25.03.01.16 Pas. kolom pendek 20/20 0.0038 M³
25.03.01.28 Pas. ring balok 15/15 0.0266 M³
25.03.01.33 Pek. beton rabatan t = 5 cm 0.0657 M³
25.03.01.28 Pek. balok lantai 0.0038 M³
25.03.01.28 Pek. Beton Pondasi Setempat 80x80 cm2, tb = 25 cm 0.0315 M³
25.03.01.28 Pek. pengecoran strouss pile 1 Pc : 1,5 Ps : 2,5 Kr 0.0417 M³
25.03.01.33 Pek. Lantai Kerja 0.0116 M³
25.03.01.28 Pek Plat Level 0.0073 M³

26.08.05.03 Rehabilitasi Pekerjaan Pasangan Bangunan Type C M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. PASANGAN
25.04.01.12 Pas. batu merah 2.6859 M²
25.04.01.30 Pek. Plesteran halus 5.3718 M²
25.04.01.38 Pek. benangan 1.9148 M¹
25.02.01.12 Pek. pondasi batu kali 0.0813 M³
25.02.01.20 Pas. aanstamping t = 20 cm 0.0494 M³

26.08.05.04 Rehabilitasi Lantai Bangunan Type C M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. LANTAI
25.05.01.03 Pas. keramik lantai 30 x 30 cm ( Motif ) 0.9820 M²
25.05.01.07 Pas. keramik dinding KM/WC 20 x 25 cm ( Motif ) 0.1364 M²
25.05.01.01 Pas. keramik lantai KM/WC 20 x 20 cm ( Motif ) 0.0344 M²
25.05.01.07 Pas. keramik dinding keliling 20 x 25 cm ( Motif ) 1.1646 M²
25.05.01.10 Pas. list keramik 7.5 x 20 cm ( Motif ) 0.0689 M¹

26.08.05.05 Rehabilitasi Daun Pintu,Jendela dan Kusen Bangunan Type C M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. DAUN PINTU,JENDELA DAN KUSEN


25.07.01.05 Pas. daun pintu triplek rangka ky. kamper 0.0771 M²
25.07.01.05 Pas. daun pintu kaca rangka ky. kamper 0.0204 M²
25.07.01.13 Pas. kaca mati tb = 5 mm 0.1034 M²
25.07.01.11 Pas. jendela diatas daun pintu/jendela 0.0585 M²
dan bouvenlist ( kaca selipan ) 0.0000
25.07.01.02 Pas. kusen ky kamper 0.0150 M³

26.08.05.06 Rehabilitasi Atap Bangunan Type C M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. ATAP
25.06.02.01 Pas. genteng jawa 1.6458 M²
25.06.01.02 Pas. kuda - kuda Ky. meranti 8/12 0.0128 M³
25.06.01.07 Pas. pengapit kuda - kuda + jurai 6/12 0.0075 M³
25.06.01.07 Pas. gording kamper 8/12 0.0132 M²
25.06.01.05 Pas. reng kamper Usuk ky. kamper 1.6458 M³
25.06.02.11 Pas. Wuwungan genteng jawa 0.2426 M¹
25.06.02.33 Pas. listplank ky papan 3 x 30 cm 0.4508 M¹
25.06.02.18 Pek. talang jurai 0.0656 M¹

26.08.05.07 Rehabilitasi Plafond Bangunan Type C M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. PLAFOND
25.06.03.04 Pas. plafond eternit rangka ky kamper 1.5984 M²
25.06.03.06 Pas. list plafond 1.6295 M¹
26.08.05.08 Rehabilitasi Pengecatan Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. PENGECATAN
25.04.02.21 Pek. pengecatan kayu ( kusen + lisplank + list plafond ) 1.0309 M²
25.04.02.10 Pek. pengecatan dinding 5.3718 M²
25.04.02.21 Pek. pengecatan plafond 1.5984 M²
25.04.02.15 Pek. plitur daun pintu + pintu kaca 0.1950 M²
25.04.02.16 Pek. koltir rangka atap 1.6458 M²
25.04.02.12 Pek. meni rangka plafond 1.5984 M²

26.08.05.09 Rehabilitasi Pekerjaan Penggantung Bangunan Type C M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. PENGANTUNG
25.07.01.19 Pas. kunci tanam 2 x putar 0.0721 Unit
25.07.01.22 Pas. engsel kuningan untuk pintu 0.1082 Stel
25.07.01.21 Pas. engsel kuningan untuk jendela 0.0787 Stel
25.07.01.32 Pas. hak angin lurus 0.0393 Bh
25.07.01.24 Pas. grendel kecil biasa 0.1508 Bh

26.08.05.10 Rehabilitasi Instalasi Listrik Bangunan Type C M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. INSTALASI LISTRIK


25.07.02.02 Pas. titik lampu 0.1246 Ttk
25.07.02.02 Pas. lampu TL 20 watt 0.1049 Bh
B.20.03.06.02.26.07 Pas. lampu pijar 10 watt 0.0197 Bh
B.24.01.02.05.023 Pas. MCB 0.0066 Bh
25.07.02.01 Pas. stop kontak 0.0787 Ttk
25.07.02.03 Pas. saklar tunggal 0.0787 Bh
25.07.02.04 Pas. saklar ganda 0.0131 Bh

26.08.04.11 Rehabilitasi Septictank & Resapan Bangunan Type C M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

Pekerjaan Sanitasi Air Kotor (Septictank + Resapan) Unit


25.01.02.07 Pek Galian tanah 0.0407 M³
25.01.02.16 Pek Urugan pasir 0.0014 M³
25.04.01.12 Pas. batu merah 0.1130 M²
25.07.03.08 Pek. pelat penutup beton 0.0033 M³
25.04.01.30 Pek. Plesteran halus 0.1130 M²
25.07.05.08 Pas Pipa 4 " 0.0098 M¹
26.08.05.12 Rehabilitasi Tandon Air (1.2x2.2x1.2) Bangunan Type C M2
PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

Tandon Air (1.2 x 2.2 x 1.20) Unit


25.01.02.07 Pek Galian tanah 0.0234 M³
25.03.02.03 Pek Pelat besi penutup tandon 0.0259 kg
25.05.01.01 Pek Keramik 20x20 bagian dalam 0.0619 M²
25.01.02.16 Pek Urugan pasir 0.0017 M³
25.03.01.36 Pek Lantai kerja 0.0009 M³
25.03.01.16 Pek beton 0.0062 M³

26.08.05.13 Rehabilitasi Instalasi Air Bangunan Type C M2


PEK. PENDAHULUAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0066 Ls

PEK. INSTALASI AIR


25.07.03.23 Pas. wastafel warna 0.0393 Unit
B.08.03.05.07.02 Pas. pompa air 0.0066 Unit
25.07.03.19 Pas. kran air 0.0525 Bh
25.07.03.30 Instalasi air bersih 0.3279 M¹
25.07.03.31 Instalasi air kotor 0.1639 M¹
25.07.03.22 Pas. kloset duduk 0.0131 Bh
25.07.03.24 Pas. avour 0.0131 Bh
25.07.03.24 Pas. floor drain 0.0131 Bh
25.07.01.46 Pas. pintu PVC KM/WC 0.0131 Bh
26.08.06 Rehabilitasi Pendopo

NO JENIS PEKERJAAN Koeff SAT.


26.08.06.01 Rehabilitasi Pondasi Pendopo M2
PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls

PEK. TANAH
25.02.01.24 Pembuatan Lubang Strous Pile diameter 30 cm 0.0400 Ttk
25.01.02.07 Galian Tanah 0.4680 M³
25.01.02.13 Urugan Tanah Kembali 0.2260 M³
25.01.02.16 Pengurugan Pasir (PADAT) 0.1542 M³
25.01.02.17 Pengurugan Sirtu (PADAT) 0.3987 M³

26.08.06.02 Rehabilitasi Pasangan Pendopo M2


PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls

PEK. PASANGAN
25.02.01.11 Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 3 Ps) 0.2150 M³
25.04.01.30 Plesteran Halus 1 Pc : 4 Ps tebal 1,5 cm 1.1365 M³
25.04.01.38 Pasang Benangan 2.9800 M

26.08.06.03 Rehabilitasi Beton Struktur Pendopo M2


PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls

PEK. BETON STRUKTUR


25.03.01.23 Pekerjaan Beton Rabat (1 Pc : 3 Ps : 6 Kr) 0.0753 M³
25.04.01.30 Plesteran Halus 1 Pc : 4 Ps tebal 1,5 cm 0.0405 M³
Beton Bertulang 1 Pc : 1.5 Ps : 2.5 Kr (K350) dengan
25.03.01.19 Pemakaian Besi 160 kg 0.1354 M³
25.03.01.17 Pekerjaan Beton Bertulang Strous Pile 0.0000
(1 Pc : 1,5 Ps : 2,5 Kr, untuk besi 130 kg) 0.0113 M³

26.08.06.04 Rehabilitasi Lantai Pendopo M2


PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls

PEK. LANTAI
25.05.01.06 Pas. keramik lantai 40 x 40 cm ( Motif ) 1.4336 M²

26.08.06.05 Rehabilitasi Pembesian Pendopo M2


PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls
PEK. PEMBESIAN
25.03.02.05 Pekerjaan Besi WF 150x100x7x10 6.9802 Kg
25.03.02.03 Pekerjaan Besi Plat Tebal 2 mm 1.1740 Kg
B.20.01.01.44.06 Baut 22 mm 3.6000 Bh
B.20.01.01.62.02 Angker 0.8000 Bh

26.08.06.07 Rehabilitasi Atap + Plafond Pendopo M2


PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls

PEK. ATAP + Plafond


25.06.01.04 Pemasangan Reng kamper/Usuk kamper 2.1150 M2
25.06.02.03 Pemasangan Genteng Karang Pilang / Wisma 2.1150 M2
25.06.02.12 Pemasangan Wuwung Genteng Karang Pilang 0.4300 M¹
25.06.02.33 Pemasangan Listplank Kayu Kamper 3 / 30 cm 0.4980 M¹
25.06.01.07 Pas. gording kamper 8/12 0.0285 M³
25.06.03.02 Pas. plafond eternit rangka ky kamper 2.1420 M2
25.06.03.06 Pas. list plafond 2.8800 M¹

26.08.06.08 Rehabilitasi Pengecatan Pendopo M2


PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls
PEK. PENGECATAN, PENGANTUNG
25.04.02.12 Pengecatan Dasar (cat meni) 2.4941 M²
25.04.02.16 Pekerjaan Ter Kayu (rangka atap) 2.1150 M²
25.04.02.21 Pek. pengecatan kayu 0.3521 M²
25.04.02.21 Pengecatan Plafond 2.1420 M²
25.04.02.10 Pengecatan Tembok (balok dan kolom) 1.1365 M²

26.08.06.09 Rehabilitasi Instalasi Listrik Pendopo M2


PEK. PERSIAPAN
B.20.01.01.64.01.05 Pek. Persiapan 0.0100 Ls

PEK. INSTALASI LISTRIK


25.07.02.02 Pas. titik lampu 0.0500 Ttk
20.03.06.02.21.65 Pas. lampu TL 20 watt 0.0400 Bh
Pas Lampu Gantung 0.0100 Ls
25.07.02.01 Pas. stop kontak 0.0200 Ttk
25.07.02.04 Pas. saklar ganda 0.0200 Bh
AR BELANJA
SI BANGUNAN GEDUNG
O

HARGA
JUMLAH (Rp)
SATUAN (Rp)

500,000.00 3,278.69
35,520.14 16,420.79
JUMLAH 19,699.47

20,250.00 3,537.44
45,600.00 8,970.49
5,062.50 221.09
117,741.25 3,582.42
117,741.25 5,983.57
JUMLAH 22,295.02

3,457,113.56 153,019.78
1,880,541.98 42,295.55
1,880,541.98 7,102.90
2,777,913.59 73,774.10
419,259.66 27,525.43
2,777,913.59 10,656.26
2,777,913.59 87,435.97
2,777,913.59 115,930.73
419,259.66 4,845.54
2,777,913.59 20,401.73
JUMLAH 542,987.98

50,100.92 134,566.15
18,901.15 101,533.26
5,865.60 11,231.18
427,332.94 34,740.07
179,720.00 8,885.83
JUMLAH 290,956.48

449,184.00 441,083.96
106,978.74 14,591.20
76,305.40 2,626.91
106,978.74 124,586.39
22,569.25 1,553.95
JUMLAH 584,442.40

284,491.72 21,938.51
284,491.72 5,798.03
307,273.40 31,773.08
332,624.50 19,451.44

6,617,060.00 99,362.64
JUMLAH 178,323.71

65,130.00 107,191.17
12,914,000.00 165,841.16
62,276.80 469.27
62,276.80 824.26
104,435.80 171,880.78
49,958.25 12,121.02
152,017.90 68,532.66
118,263.44 7,754.98
JUMLAH 534,615.30

122,735.00 196,174.80
4,683.00 7,630.99
JUMLAH 203,805.78

88,190.90 90,913.36
19,986.00 107,360.86
21,821.40 34,878.47
39,277.80 7,658.78
6,287.50 10,347.99
5,287.20 8,450.85
JUMLAH 259,610.31
97,650.00 7,043.61
42,800.00 4,630.82
34,700.00 2,730.49
26,200.00 1,030.82
9,600.00 1,447.87
JUMLAH 16,883.61

195,150.00 24,313.77
51,700.00 5,424.26
7,450.00 146.56
227,500.00 1,491.80
29,205.30 2,298.12
26,755.30 2,105.34
29,205.30 383.02
JUMLAH 36,162.87

20,250.00 824.89
117,741.25 159.87
50,100.92 5,660.11
1,784,684.36 5,815.98
18,901.15 2,135.34
135,517.96 1,332.96
Jumlah 15,929.17

20,250.00 473.25
13,753.60 356.24
76,305.40 4,723.43
117,741.25 203.83
418,649.94 362.37
2,777,913.59 17,195.74
Jumlah 23,314.86

459,150.00 18,064.92
450,000.00 2,950.82
58,250.00 3,055.74
69,000.00 22,622.95
77,937.50 12,776.64
281,900.00 3,697.05
19,060.00 249.97
19,060.00 249.97
185,120.00 2,427.80
JUMLAH 66,095.85

300000 1,967.21
500,000.00 3,278.69
JUMLAH 5,245.90
Nilai ASB 2,800,368.71
500,000.00 3,278.69
35,520.14 16,420.79
JUMLAH 19,699.47

20,250.00 3,537.44
45,600.00 8,970.49
5,062.50 221.09
117,741.25 3,582.42
117,741.25 5,983.57
JUMLAH 22,295.02

3,457,113.56 153,019.78
1,880,541.98 42,295.55
1,880,541.98 7,102.90
2,777,913.59 73,774.10
419,259.66 27,525.43
2,777,913.59 10,656.26
2,777,913.59 87,435.97
2,777,913.59 115,930.73
419,259.66 4,845.54
2,777,913.59 20,401.73
JUMLAH 542,987.98

50,100.92 134,566.15
18,901.15 101,533.26
5,865.60 11,231.18
427,332.94 34,740.07
179,720.00 8,885.83
JUMLAH 290,956.48

69,654.00 68,397.94
106,978.74 14,591.20
76,305.40 2,626.91
106,978.74 124,586.39
22,569.25 1,553.95
JUMLAH 211,756.39

284,491.72 21,938.51
284,491.72 5,798.03
55,973.40 5,787.83
332,624.50 19,451.44

6,617,060.00 99,362.64
JUMLAH 152,338.46

65,130.00 107,191.17
5,273,760.00 67,725.45
62,276.80 469.27
62,276.80 824.26
81,248.35 133,718.80
49,958.25 12,121.02
69,049.16 31,128.72
118,263.44 7,754.98
JUMLAH 360,933.67

113,412.72 181,274.43
4,683.00 7,630.99
JUMLAH 188,905.42

21,821.40 22,495.03
11,820.00 63,494.71
21,821.40 34,878.47
39,277.80 7,658.78
6,287.50 10,347.99
5,287.20 8,450.85
JUMLAH 147,325.83

97,650.00 7,043.61
42,800.00 4,630.82
34,700.00 2,730.49
26,200.00 1,030.82
9,600.00 1,447.87
JUMLAH 16,883.61

195,150.00 24,313.77
51,700.00 5,424.26
7,450.00 146.56
227,500.00 1,491.80
29,205.30 2,298.12
26,755.30 2,105.34
29,205.30 383.02
JUMLAH 36,162.87
20,250.00 824.89
117,741.25 159.87
50,100.92 5,660.11
1,784,684.36 5,815.98
18,901.15 2,135.34
135,517.96 1,332.96
Jumlah 15,929.17

20,250.00 473.25
13,753.60 356.24
76,305.40 4,723.43
117,741.25 203.83
418,649.94 362.37
2,777,913.59 17,195.74
Jumlah 23,314.86

459,150.00 18,064.92
450,000.00 2,950.82
58,250.00 3,055.74
69,000.00 22,622.95
77,937.50 12,776.64
281,900.00 3,697.05
19,060.00 249.97
19060 249.97
185120 2,427.80
JUMLAH 66,095.85

300000 1,967.21
500000 3,278.69
JUMLAH 5,245.90
Nilai ASB 2,100,830.98

500000 3,278.69
35520.14 16,420.79
JUMLAH 19,699.47

20250 3,537.44
3600 708.20
45600 1,991.45
117741.25 3,582.42
117741.25 5,983.57
JUMLAH 15,803.08

3457113.56 153,019.78
1880541.98025 42,295.55
1880541.98025 7,102.90
2777913.591 73,774.10
419259.66 27,525.43
2777913.591 10,656.26
2777913.591 87,435.97
2777913.591 115,930.73
419259.66 4,845.54
2777913.591 20,401.73
JUMLAH 542,987.98

50100.9219009219 134,566.15
18901.15 101,533.26
5865.6 11,231.18
427332.94 34,740.07
179720 8,885.83
JUMLAH 290,956.48

67924 66,699.14
106978.74 14,591.20
76305.4 2,626.91
106978.74 124,586.39
22569.245625 1,553.95
JUMLAH 210,057.58
281731.72 21,725.67
281731.72 5,741.78
55973.4 5,787.83
332624.5 19,451.44

4635300 69,604.27
JUMLAH 122,311.01

22630 37,244.53
4768720 61,239.75
62276.8 469.27
62276.8 824.26
70547.71 116,107.65
42312.9 10,266.08
69049.16 31,128.72
118263.44 7,754.98
JUMLAH 265,035.23

77374.84 123,672.90
4683 7,630.99
JUMLAH 131,303.89

21821.4 22,495.03
11820 63,494.71
21821.4 34,878.47
39277.8 7,658.78
6287.5 10,347.99
5287.2 8,450.85
JUMLAH 147,325.83

97650 7,043.61
42800 4,630.82
34700 2,730.49
26200 1,030.82
9600 1,447.87
JUMLAH 16,883.61

94500 11,773.77
1650 173.11
7800 153.44
227,500.00 1,491.80
29,205.30 2,298.12
26,755.30 2,105.34
29,205.30 383.02
JUMLAH 18,378.61

20250 824.89
117741.25 159.87
50100.9219009219 5,660.11
1784684.36 5,815.98
18901.15 2,135.34
135517.96296 1,332.96
Jumlah 15,929.17
0.00
208732.5 4,878.18
13753.6 356.24
76305.4 4,723.43
117741.25 203.83
418649.94 362.37
2777913.591 17,195.74
Jumlah 27,719.79

459150 18,064.92
450000 2,950.82
58250 3,055.74
69000 22,622.95
77937.5 12,776.64
281900 3,697.05
19060 249.97
19060 249.97
185120 2,427.80
JUMLAH 66,095.85
300000 1,967.21
500000 3,278.69
JUMLAH 5,245.90
Nilai ASB 1,889,455.21

HARGA
JUMLAH (Rp)
SATUAN (Rp)

350000 3,500.00
43115.8 3,449.26
Jumlah 6,949.26

43115.8 1,724.63
20250 9,477.00
5062.5 1,143.92
106956.25 16,492.65
87501.25 34,886.75
Jumlah 63,724.96

406973.71338 87,515.63
5000 5,682.50
5680.8 16,928.78
Jumlah 110,126.91

404051.645 30,410.54
18606.5 753.56

3241888.403 439,081.37

2907758.003 32,899.20
Jumlah 503,144.68

80364 115,209.83
Jumlah 115,209.83

13093.6 91,396.50
13753.6 16,146.77
3000 10,800.00
2200 1,760.00
Jumlah 118,343.27

58904.52 124,583.06
64380 136,163.70
49958.25 21,482.05
46133.18 22,974.32
62276.8 1,771.81
67775.76 145,175.68
2988.25 8,606.16
Jumlah 460,756.78

5287.2 13,186.70
6287.5 13,298.06
21821.4 7,682.88
21821.4 46,741.44
11820 13,433.43
Jumlah 94,342.51

195150 9,757.50
51700 2,068.00
1500000 15,000.00
29205.3 584.11
29205.3 584.11
Jumlah 27,993.71

300000 3,000.00
350000 3,500.00
Jumlah 6,500.00
Nilai ASB 1,507,091.91
HARGA
JUMLAH (Rp)
SATUAN (Rp)

500,000.00 3,278.69
JUMLAH 3,278.69

20,250.00 3,537.44
45,600.00 8,970.49
5,062.50 221.09
117,741.25 3,582.42
117,741.25 5,983.57
JUMLAH 22,295.02
Nilai ASB 25,573.71

500,000.00 3,278.69
JUMLAH 3,278.69

3,457,113.56 153,019.78
1,880,541.98 42,295.55
1,880,541.98 7,102.90
2,777,913.59 73,774.10
419,259.66 27,525.43
2,777,913.59 10,656.26
2,777,913.59 87,435.97
2,777,913.59 115,930.73
419,259.66 4,845.54
2,777,913.59 20,401.73
JUMLAH 542,987.98
Nilai ASB 546,266.66

500,000.00 3,278.69
JUMLAH 3,278.69

50,100.92 134,566.15
18,901.15 101,533.26
5,865.60 11,231.18
427,332.94 34,740.07
179,720.00 8,885.83
JUMLAH 290,956.48
Nilai ASB 294,235.17

500,000.00 3,278.69
JUMLAH 3,278.69
449,184.00 441,083.96
106,978.74 14,591.20
76,305.40 2,626.91
106,978.74 124,586.39
22,569.25 1,553.95
JUMLAH 584,442.40
Nilai ASB 587,721.09

500,000.00 3,278.69
JUMLAH 3,278.69

284,491.72 21,938.51
284,491.72 5,798.03
307,273.40 31,773.08
332,624.50 19,451.44

6,617,060.00 99,362.64
JUMLAH 178,323.71
Nilai ASB 181,602.39
500,000.00 3,278.69
JUMLAH 3,278.69

65,130.00 107,191.17
12,914,000.00 165,841.16
62,276.80 469.27
62,276.80 824.26
104,435.80 171,880.78
49,958.25 12,121.02
152,017.90 68,532.66
118,263.44 7,754.98
JUMLAH 534,615.30
Nilai ASB 537,893.99

500,000.00 3,278.69
JUMLAH 3,278.69

122,735.00 196,174.80
4,683.00 7,630.99
JUMLAH 203,805.78
Nilai ASB 207,084.47

500,000.00 3,278.69
JUMLAH 3,278.69

88,190.90 90,913.36
19,986.00 107,360.86
21,821.40 34,878.47
39,277.80 7,658.78
6,287.50 10,347.99
5,287.20 8,450.85
JUMLAH 259,610.31
Nilai ASB 262,889.00

500,000.00 3,278.69
JUMLAH 3,278.69

97,650.00 7,043.61
42,800.00 4,630.82
34,700.00 2,730.49
26,200.00 1,030.82
9,600.00 1,447.87
JUMLAH 16,883.61
Nilai ASB 20,162.30
500,000.00 3,278.69
JUMLAH 3,278.69

195,150.00 24,313.77
51,700.00 5,424.26
7,450.00 146.56
227,500.00 1,491.80
29,205.30 2,298.12
26,755.30 2,105.34
29,205.30 383.02
JUMLAH 36,162.87
Nilai ASB 39,441.56

500,000.00 3,278.69
JUMLAH 3,278.69

20,250.00 824.89
117,741.25 159.87
50,100.92 5,660.11
1,784,684.36 5,815.98
18,901.15 2,135.34
135,517.96 1,332.96
Jumlah 15,929.17
Nilai ASB 19,207.86
500,000.00 3,278.69
JUMLAH 3,278.69

20,250.00 473.25
13,753.60 356.24
76,305.40 4,723.43
117,741.25 203.83
418,649.94 362.37
2,777,913.59 17,195.74
Jumlah 23,314.86
Nilai ASB 26,593.55

500,000.00 3,278.69
JUMLAH 3,278.69

459,150.00 18,064.92
450,000.00 2,950.82
58,250.00 3,055.74
69,000.00 22,622.95
77,937.50 12,776.64
281,900.00 3,697.05
19,060.00 249.97
19,060.00 249.97
185,120.00 2,427.80
JUMLAH 66,095.85
Nilai ASB 69,374.54

HARGA
JUMLAH (Rp)
SATUAN (Rp)

500,000.00 3,278.69
JUMLAH 3,278.69

20,250.00 3,537.44
45,600.00 8,970.49
5,062.50 221.09
117,741.25 3,582.42
117,741.25 5,983.57
JUMLAH 22,295.02
Nilai ASB 25,573.71

500,000.00 3,278.69
JUMLAH 3,278.69
3,457,113.56 153,019.78
1,880,541.98 42,295.55
1,880,541.98 7,102.90
2,777,913.59 73,774.10
419,259.66 27,525.43
2,777,913.59 10,656.26
2,777,913.59 87,435.97
2,777,913.59 115,930.73
419,259.66 4,845.54
2,777,913.59 20,401.73
JUMLAH 542,987.98
Nilai ASB 546,266.66

500,000.00 3,278.69
JUMLAH 3,278.69

50,100.92 134,566.15
18,901.15 101,533.26
5,865.60 11,231.18
427,332.94 34,740.07
179,720.00 8,885.83
JUMLAH 290,956.48
Nilai ASB 294,235.17
500,000.00 3,278.69
JUMLAH 3,278.69

69,654.00 68,397.94
106,978.74 14,591.20
76,305.40 2,626.91
106,978.74 124,586.39
22,569.25 1,553.95
JUMLAH 211,756.39
Nilai ASB 215,035.08

500,000.00 3,278.69
JUMLAH 3,278.69

284,491.72 21,938.51
284,491.72 5,798.03
55,973.40 5,787.83
332,624.50 33,524.38

6,617,060.00 99,362.64
JUMLAH 166,411.39
Nilai ASB 169,690.08

500,000.00 3,278.69
JUMLAH 3,278.69

65,130.00 107,191.17
5,273,760.00 67,725.45
62,276.80 469.27
62,276.80 824.26
81,248.35 133,718.80
49,958.25 12,121.02
69,049.16 31,128.72
118,263.44 7,754.98
JUMLAH 360,933.67
Nilai ASB 364,212.36

500,000.00 3,278.69
JUMLAH 3,278.69

113,412.72 181,274.43
4,683.00 7,630.99
JUMLAH 188,905.42
Nilai ASB 192,184.10
500,000.00 3,278.69
JUMLAH 3,278.69

21,821.40 22,495.03
11,820.00 63,494.71
21,821.40 34,878.47
39,277.80 7,658.78
6,287.50 10,347.99
5,287.20 8,450.85
JUMLAH 147,325.83
Nilai ASB 150,604.52

500,000.00 3,278.69
JUMLAH 3,278.69

97,650.00 7,043.61
42,800.00 4,630.82
34,700.00 2,730.49
26,200.00 1,030.82
9,600.00 1,447.87
JUMLAH 16,883.61
Nilai ASB 20,162.30
500,000.00 3,278.69
JUMLAH 3,278.69

195,150.00 24,313.77
51,700.00 5,424.26
7,450.00 146.56
227,500.00 1,491.80
29,205.30 2,298.12
26,755.30 2,105.34
29,205.30 383.02
JUMLAH 36,162.87
Nilai ASB 39,441.56

500,000.00 3,278.69
JUMLAH 3,278.69

20,250.00 824.89
117,741.25 159.87
50,100.92 5,660.11
1,784,684.36 5,815.98
18,901.15 2,135.34
135,517.96 1,332.96
Jumlah 15,929.17
Nilai ASB 19,207.86

500,000.00 3,278.69
JUMLAH 3,278.69

20,250.00 473.25
13,753.60 356.24
76,305.40 4,723.43
117,741.25 203.83
418,649.94 362.37
2,777,913.59 17,195.74
Jumlah 23,314.86
Nilai ASB 26,593.55

500,000.00 3,278.69
JUMLAH 3,278.69

459,150.00 18,064.92
450,000.00 2,950.82
58,250.00 3,055.74
69,000.00 22,622.95
77,937.50 12,776.64
281,900.00 3,697.05
19,060.00 249.97
19,060.00 249.97
185,120.00 2,427.80
JUMLAH 66,095.85
Nilai ASB 69,374.54

HARGA
JUMLAH (Rp)
SATUAN (Rp)

500,000.00 3,278.69
JUMLAH 3,278.69

20,250.00 3,537.44
45,600.00 8,970.49
5,062.50 221.09
117,741.25 3,582.42
117,741.25 5,983.57
JUMLAH 22,295.02
Nilai ASB 25,573.71
500,000.00 3,278.69
JUMLAH 3,278.69

3,457,113.56 153,019.78
1,880,541.98 42,295.55
1,880,541.98 7,102.90
2,777,913.59 73,774.10
419,259.66 27,525.43
2,777,913.59 10,656.26
2,777,913.59 87,435.97
2,777,913.59 115,930.73
419,259.66 4,845.54
2,777,913.59 20,401.73
JUMLAH 542,987.98
Nilai ASB 546,266.66

500,000.00 3,278.69
JUMLAH 3,278.69

50,100.92 134,566.15
18,901.15 101,533.26
5,865.60 11,231.18
427,332.94 34,740.07
179,720.00 8,885.83
JUMLAH 290,956.48
Nilai ASB 294,235.17

500,000.00 3,278.69
JUMLAH 3,278.69

67,924.00 66,699.14
106,978.74 14,591.20
76,305.40 2,626.91
106,978.74 124,586.39
22,569.25 1,553.95
JUMLAH 210,057.58
Nilai ASB 213,336.27

500,000.00 3,278.69
JUMLAH 3,278.69

281,731.72 21,725.67
281,731.72 5,741.78
55,973.40 5,787.83
332,624.50 19,451.44
4,635,300.00 69,604.27
JUMLAH 122,311.01
Nilai ASB 125,589.70

500,000.00 3,278.69
JUMLAH 3,278.69

22,630.00 37,244.53
4,768,720.00 61,239.75
62,276.80 469.27
62,276.80 824.26
70,547.71 116,107.65
42,312.90 10,266.08
69,049.16 31,128.72
118,263.44 7,754.98
JUMLAH 265,035.23
Nilai ASB 268,313.92

500,000.00 3,278.69
JUMLAH 3,278.69

77,374.84 123,672.90
4,683.00 7,630.99
JUMLAH 131,303.89
Nilai ASB 134,582.58
500,000.00 3,278.69
JUMLAH 3,278.69

21,821.40 22,495.03
11,820.00 63,494.71
21,821.40 34,878.47
39,277.80 7,658.78
6,287.50 10,347.99
5,287.20 8,450.85
JUMLAH 147,325.83
Nilai ASB 150,604.52

500,000.00 3,278.69
JUMLAH 3,278.69

97,650.00 7,043.61
42,800.00 4,630.82
34,700.00 2,730.49
26,200.00 1,030.82
9,600.00 1,447.87
JUMLAH 16,883.61
Nilai ASB 20,162.30

500,000.00 3,278.69
JUMLAH 3,278.69

195,150.00 24,313.77
51,700.00 5,424.26
7,450.00 146.56
227,500.00 1,491.80
29,205.30 2,298.12
26,755.30 2,105.34
29,205.30 383.02
JUMLAH 36,162.87
Nilai ASB 39,441.56

500,000.00 3,278.69
JUMLAH 3,278.69

20,250.00 824.89
117,741.25 159.87
50,100.92 5,660.11
1,784,684.36 5,815.98
18,901.15 2,135.34
135,517.96 1,332.96
Jumlah 15,929.17
Nilai ASB 19,207.86

500,000.00 3,278.69
JUMLAH 3,278.69

20,250.00 473.25
13,753.60 356.24
76,305.40 4,723.43
117,741.25 203.83
418,649.94 362.37
2,777,913.59 17,195.74
Jumlah 23,314.86
Nilai ASB 26,593.55

500,000.00 3,278.69
JUMLAH 3,278.69

459,150.00 18,064.92
450,000.00 2,950.82
58,250.00 3,055.74
69,000.00 22,622.95
77,937.50 12,776.64
281,900.00 3,697.05
19,060.00 249.97
19,060.00 249.97
185,120.00 2,427.80
JUMLAH 66,095.85
Nilai ASB 69,374.54
HARGA
JUMLAH (Rp)
SATUAN (Rp)

350,000.00 3,500.00
Jumlah 3,500.00

43,115.80 1,724.63
20,250.00 9,477.00
5,062.50 1,143.92
106,956.25 16,492.65
87,501.25 34,886.75
Jumlah 63,724.96
Nilai ASB 67,224.96

350,000.00 3,500.00
Jumlah 3,500.00

406,973.71 87,515.63
5,000.00 5,682.50
5,680.80 16,928.78
Jumlah 110,126.91
Nilai ASB 113,626.91

350,000.00 3,500.00
Jumlah 3,500.00

404,051.65 30,410.54
18,606.50 753.56

3,241,888.40 439,081.37

2,907,758.00 32,899.20
Jumlah 503,144.68
Nilai ASB 506,644.68

350,000.00 3,500.00
Jumlah 3,500.00

80,364.00 115,209.83
Jumlah 115,209.83
Nilai ASB 118,709.83

350,000.00 3,500.00
Jumlah 3,500.00

13,093.60 91,396.50
13,753.60 16,146.77
3,000.00 10,800.00
2,200.00 1,760.00
Jumlah 118,343.27
Nilai ASB 121,843.27

350,000.00 3,500.00
Jumlah 3,500.00

58,904.52 124,583.06
64,380.00 136,163.70
49,958.25 21,482.05
46,133.18 22,974.32
62,276.80 1,771.81
67,775.76 145,175.68
2,988.25 8,606.16
Jumlah 460,756.78
Nilai ASB 464,256.78

350,000.00 3,500.00
Jumlah 3,500.00
5,287.20 13,186.70
6,287.50 13,298.06
21,821.40 7,682.88
21,821.40 46,741.44
11,820.00 13,433.43
Jumlah 94,342.51
Nilai ASB 97,842.51

350,000.00 3,500.00
Jumlah 3,500.00

195,150.00 9,757.50
51,700.00 2,068.00
1,500,000.00 15,000.00
29,205.30 584.11
29,205.30 584.11
Jumlah 27,993.71
Nilai ASB 31,493.71