0 00 2 481,550,000.00
1 Satu 000 1 481,550,000.00
2 Dua Lima Ratus Lima Puluh Ribu 0 481,550,000.00
3 Tiga Empat Ratus Delapan Puluh Satu -1 481,550,000.00
4 Empat 000 -2 481,550,000.00
5 Lima 000 -3 481,550,000.00
6 Enam -4 481,550,000.00
7 Tujuh -5 481,500,000.00
8 Delapan -6 481,000,000.00
9 Sembilan -7 480,000,000.00
10 Sepuluh -8 400,000,000.00
11 Sebelas -9 -
12 Dua Belas -10 -
13 Tiga Belas -11 -
14 Empat Belas -12 -
15 Lima Belas -13 -
16 Enam Belas -14 -
17 Tujuh Belas
18 Delapan Belas
19 Sembilan Belas
20 Dua Puluh
30 Tiga Puluh
40 Empat Puluh
50 Lima Puluh
60 Enam Puluh
70 Tujuh Puluh
80 Delapan Puluh
90 Sembilan Puluh
100 Seratus
200 Dua Ratus
300 Tiga Ratus
400 Empat Ratus
500 Lima Ratus
600 Enam Ratus
700 Tujuh Ratus
800 Delapan Ratus
900 Sembilan Ratus
1000 Seribu
Puluh Satu Juta Lima Ratus Lima Puluh Ribu Rupiah
Puluh Satu Juta Lima Ratus Lima Puluh Ribu Rupiah
0
0 0
0 0
0 0
0 0
0 0
0 0 Ribu
50 50 Lima Puluh
500 ### Lima Ratus
1 1 Satu Juta
80 80 Delapan Puluh
400 ### Empat Ratus
0 0
0 0
0 0
0 0
0 0
0 0
REKAPITULASI ANGGARAN BIAYA
INSTANSI : DINAS PENDIDIKAN PROVINSI SUMATERA UTARA
PEKERJAAN : PEMBANGUNAN RUANG KELAS BARU BESERTA PERABOTNYA
LOKASI : SMA NEGERI 1 PALIPI
KABUPATEN/KOTA : SAMOSIR
TAHUN ANGGARAN : 2019
1 2
A. PEKERJAAN KONSTRUKSI FISIK (GEDUNG)
I. PEKERJAAN PENDAHULUAN
II. PEKERJAAN PONDASI
III. PEKERJAAN BETON / STRUKTUR
IV. PEKERJAAN DINDING
V. PEKERJAAN ATAP
VI. PEKERJAAN PINTU, JENDELA DAN VENTILASI
VII. PEKERJAAN LANTAI
VIII. PEKERJAAN PLAFOND
IX. PEKERJAAN INSTALASI LISTRIK
X. PEKERJAAN PENGECATAN
JUMLAH PEKERJAAN KONSTRUKSI FISIK (GEDUNG I+II+III+IV+V+VI+VII+VIII+IX+X+XI)
B. PEKERJAAN MEUBELAIR
I PEKERJAAN MEUBILER
GRAND TOTAL (A+B)
DIBULATKAN
TERBILANG : Empat Ratus Delapan Puluh Satu Juta Lima Ratus Lima Puluh Ribu Rupiah
Di Setujui oleh,
Kepala Sekolah SMA Negeri 1 Palipi
Rp 2,043,040.00
Rp 27,885,746.49
Rp 73,584,304.25
Rp 67,353,670.76
Rp 72,413,850.99
Rp 25,740,494.44
Rp 63,926,889.77
Rp 29,313,009.93
Rp 5,449,000.00
Rp 24,060,175.58
Rp 391,770,182.20
Rp 89,780,000.00
Rp 481,550,182.20
Rp 481,550,000.00
Parantes Gurning,ST
DAFTAR KUANTITAS DAN HARGA
NO URAIAN PEKERJAAN
Page 7 of 147
NO URAIAN PEKERJAAN
Page 8 of 147
NO URAIAN PEKERJAAN
V PEKERJAAN ATAP
1 Pekerjaan Pemasangan Rangka Atap Baja Ringan C.75
2 Pekerjaan Pemasangan Atap Spandek #0,30 mm
3 Pekerjaan Pemasangan Rabung Atap #0,30 mm
4 Pekerjaan Pemasangan Listplank GRC
IX PEKERJAAN PLAFOND
1 Pekerjaan Rangka Furing Channel Plafond
2 Pekerjaan Plafond Gypsum Tbl. 9 mm
3 Pekerjaan List Plafond Gypsum untuk Ruangan Bagian Dalam
XI PEKERJAAN PENGECATAN
1 Pekerjaan Cat Tembok Baru
2 Pekerjaan Cat Tembok Baru untuk Plafond Gypsum
3 Pekerjaan Cat Kilat Baru untuk Kosen Pintu dan daun Pintu (P1) dan Kosen Daun Jendela (J1)
4 Pekerjaan Cat Kilat Baru untuk Listplank
Page 9 of 147
TITAS DAN HARGA
Page 10 of 147
HARGA SATUAN JUMLAH HARGA
ANALISA VOLUME SATUAN
(Rp.) (Rp.)
Page 11 of 147
HARGA SATUAN JUMLAH HARGA
ANALISA VOLUME SATUAN
(Rp.) (Rp.)
Page 12 of 147
ANALISA HARGA SATUAN
DINAS PENDIDIKAN PROVINSI SUMATERA UTARA
PEMBANGUNAN RUANG KELAS BARU BESERTA PERABOTNYA
DANA ALOKASI KUSUS (DAK) TAHUN 2019
PEKERJAAN PERSIAPAN
Dihitung 4 Membongkar 1m2 Rangka Atap / Reng Kaso ( jika bongkaran tidak dipakai )
No. Uraian Satuan Indeks Harga Satuan (Rp.)
1 2 3 4 5
A. UPAH / TENAGA
Pekerja OH 0.025 95,000.00
Tukang Kayu OH 0.100 130,000.00
Kepala Tukang OH 0.0025 -
Mandor OH 0.005 -
JUMLAH HARGA UPAH
B. BAHAN / MATERIAL
Dihitung 5 Membongkar 1m3 Kuda-Kuda, Gording / Balok-Balok ( jika bongkaran tidak dipakai )
No. Uraian Satuan Indeks Harga Satuan (Rp.)
1 2 3 4 5
A. UPAH / TENAGA
Pekerja OH 4.000 95,000.00
Tukang Kayu OH 3.000 130,000.00
Kepala Tukang OH - -
Mandor OH 0.200 -
JUMLAH HARGA UPAH
B. BAHAN / MATERIAL
PEKERJAAN TANAH
A. 2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m
No. Uraian Satuan Indeks Harga Satuan (Rp.)
1 2 3 4 5
A. UPAH / TENAGA
Pekerja OH 0.750 95,000.00
Mandor OH 0.025 -
JUMLAH HARGA UPAH
B. BAHAN / MATERIAL
PEKERJAAN PONDASI
A. 3.2.1.2 Memasang 1 m3 pondasi batu belah camp. 1 Pc : 4 Pp
No. Uraian Satuan Indeks Harga Satuan (Rp.)
1 2 3 4 5
A. UPAH / TENAGA
Pekerja OH 1.500 95,000.00
Tukang Batu OH 0.750 130,000.00
Kepala Tukang OH 0.075 -
Mandor OH 0.075 -
JUMLAH HARGA UPAH
B. BAHAN / MATERIAL
Batu belah 15-20 cm M3 1.200 250,800.00
Semen Portland Kg 163.000 1,725.00
Pasir pasang M3 0.520 185,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
A. 4.4.1.9 Memasang 1 m2 dinding batu bata merah tbl. 1/2 bata, camp. Spesi 1 Pc : 4 Pp
No. Uraian Satuan Indeks Harga Satuan (Rp.)
1 2 3 4 5
A. UPAH / TENAGA
Pekerja OH 0.300 95,000.00
Tukang Batu OH 0.100 130,000.00
Kepala Tukang OH 0.010 -
Mandor OH 0.015 -
JUMLAH HARGA UPAH
B. BAHAN / MATERIAL
Bata merah Bh 70.000 770.00
Semen Portland Kg 11.500 1,725.00
Pasir pasang Kg 0.043 185,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
PEKERJAAN KAYU
A. 4.6.1.2 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
No. Uraian Satuan Indeks Harga Satuan (Rp.)
1 2 3 4 5
A. UPAH / TENAGA
Pekerja OH 6.000 95,000.00
Tukang Kayu OH 18.000 130,000.00
Kepala Tukang OH 1.800 -
Mandor OH 0.300 -
JUMLAH HARGA UPAH
B. BAHAN / MATERIAL
Balok Kayu Kls II Bh 1.200 4,500,000.00
Paku 10 cm Kg 1.250 22,000.00
Lem Kayu Kg 1.000 49,500.00
JUMLAH HARGA BAHAN
C. PERALATAN
A. 4.6.1.6 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas II
No. Uraian Satuan Indeks Harga Satuan (Rp.)
1 2 3 4 5
A. UPAH / TENAGA
Pekerja OH 0.800 95,000.00
Tukang Kayu OH 2.400 130,000.00
Kepala Tukang OH 0.240 -
Mandor OH 0.040 -
JUMLAH HARGA UPAH
B. BAHAN / MATERIAL
Papan kayu Kls II Bh 0.024 5,500,000.00
Lem Kayu Kg 0.300 49,500.00
Kaca polos tbl. 5 mm Lbr 0.800 162,800.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (0%)
F. Harga Satuan Pekerjaan (D+E)
PEKERJAAN ATAP
A. 4.5.2.32 Pemasangan 1 m2 genteng metal
No. Uraian Satuan Indeks Harga Satuan (Rp.)
1 2 3 4 5
A. UPAH / TENAGA
Pekerja OH 0.200 95,000.00
Tukang Kayu OH 0.100 130,000.00
Kepala Tukang OH 0.010 -
Mandor OH 0.001 -
JUMLAH HARGA UPAH
B. BAHAN / MATERIAL
Atap genteng metal tbl. 0,35 M2 1.020 73,700.00
Screw Truss 12-14 x 20 Bh 9.000 350.00
JUMLAH HARGA BAHAN
C. PERALATAN
TAKSIR 3 1m2 Pasang nok / rabung Atap Metal Bergelombang Tbl. 0,30 mm
No. Uraian Satuan Indeks Harga Satuan (Rp.)
1 2 3 4 5
A. UPAH / TENAGA
Pekerja OH 0.015 95,000.00
Tukang Kayu OH 0.070 130,000.00
Kepala Tukang OH 0.008 -
Mandor OH 0.006 -
JUMLAH HARGA UPAH
B. BAHAN / MATERIAL
Rabung Spandek tbl. 0,35 Lbr 1.100 49,500.00
Screw Truss 10-16 x 16 Bh 6.000 250.00
JUMLAH HARGA BAHAN
C. PERALATAN
PEKERJAAN LANGIT-LANGIT
A. 4.5.1.5 Pemasangan 1 m2 langit-langit triplek ukuran (120 x 240 cm), tebal 6 mm
No. Uraian Satuan Indeks Harga Satuan (Rp.)
1 2 3 4 5
A. UPAH / TENAGA
Pekerja OH 0.100 95,000.00
Tukang Kayu OH 0.100 130,000.00
Kepala Tukang OH 0.010 -
Mandor OH 0.005 -
JUMLAH HARGA UPAH
B. BAHAN / MATERIAL
Tripleks 6 mm Lbr 0.375 104,500.00
Paku Tripleks Kg 0.030 27,500.00
JUMLAH HARGA BAHAN
C. PERALATAN
PEKERJAAN ELEKTRIKAL
A.4.7.1.10 1 m2 Pengecatan tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Satuan Indeks Harga Satuan (Rp.)
1 2 3 4 5
A. UPAH / TENAGA
Pekerja OH 0.020 95,000.00
Tukang Cat OH 0.063 130,000.00
Kepala Tukang OH 0.0063 -
Mandor OH 0.003 -
JUMLAH HARGA UPAH
B. BAHAN / MATERIAL
Plamur Kg 0.100 21,000.00
Cat dasar Kg 0.100 36,000.00
Cat penutup / setara vinilex Kg 0.260 33,600.00
JUMLAH HARGA BAHAN
C. PERALATAN
9,500.00
13,000.00
-
-
22,500.00
42,000.00
440.00
31,500.00
73,940.00
-
96,440.00
-
96,440.00
24,110.00
9,500.00
-
9,500.00
-
9,500.00
-
9,500.00
19,000.00
-
19,000.00
-
19,000.00
-
19,000.00
Jumlah Harga (Rp.)
6
4,750.00
-
4,750.00
-
4,750.00
-
4,750.00
4,750.00
-
4,750.00
-
4,750.00
4,750.00
2,375.00
13,000.00
-
-
15,375.00
-
15,375.00
-
15,375.00
380,000.00
390,000.00
-
-
770,000.00
-
770,000.00
-
770,000.00
Jumlah Harga (Rp.)
6
3,800.00
-
3,800.00
-
3,800.00
-
3,800.00
1,900.00
-
1,900.00
-
1,900.00
-
1,900.00
950.00
6,500.00
7,450.00
-
7,450.00
-
7,450.00
130,000.00
-
130,000.00
-
130,000.00
-
130,000.00
Jumlah Harga (Rp.)
6
1,900.00
-
1,900.00
-
1,900.00
-
1,900.00
71,250.00
-
71,250.00
-
-
-
71,250.00
-
71,250.00
47,500.00
-
47,500.00
-
-
-
47,500.00
-
47,500.00
28,500.00
-
28,500.00
198,000.00
-
198,000.00
-
226,500.00
-
226,500.00
Jumlah Harga (Rp.)
6
28,500.00
-
28,500.00
114,000.00
114,000.00
-
142,500.00
-
142,500.00
142,500.00
97,500.00
-
-
240,000.00
300,960.00
281,175.00
96,200.00
678,335.00
-
918,335.00
-
918,335.00
74,100.00
50,700.00
-
-
124,800.00
300,960.00
71,280.00
372,240.00
-
497,040.00
-
497,040.00
Jumlah Harga (Rp.)
6
156,750.00
35,750.00
-
-
192,500.00
426,075.00
114,832.14
247,900.00
43,000.00
831,807.14
-
1,024,307.14
-
1,024,307.14
156,750.00
35,750.00
-
-
192,500.00
562,350.00
100,428.57
255,344.44
43,000.00
961,123.02
-
1,153,623.02
-
1,153,623.02
6,650.00
9,100.00
-
-
15,750.00
155,925.00
3,300.00
159,225.00
-
174,975.00
-
174,975.00
17,497.50
Jumlah Harga (Rp.)
6
49,400.00
33,800.00
-
-
83,200.00
140,000.00
6,600.00
420.00
147,020.00
-
230,220.00
-
230,220.00
115,110.00
49,400.00
33,800.00
-
-
83,200.00
157,500.00
6,600.00
420.00
164,520.00
-
247,720.00
-
247,720.00
123,860.00
62,700.00
42,900.00
-
-
105,600.00
140,000.00
8,800.00
840.00
67,500.00
59,675.00
50,000.00
326,815.00
-
432,415.00
-
432,415.00
216,207.50
Jumlah Harga (Rp.)
6
62,700.00
42,900.00
-
-
105,600.00
140,000.00
8,800.00
840.00
81,000.00
59,675.00
50,000.00
340,315.00
-
445,915.00
-
445,915.00
222,957.50
17,100.00
2,600.00
2,600.00
2,600.00
-
-
24,900.00
7,000.00
220.00
-
44,550.00
9,900.00
6,900.00
1,110.00
3,015.00
72,695.00
-
97,595.00
-
97,595.00
28,215.00
4,290.00
4,290.00
4,290.00
-
-
41,085.00
10,500.00
440.00
-
53,460.00
1,100.00
9,487.50
1,665.00
5,025.00
81,677.50
-
122,762.50
-
122,762.50
Jumlah Harga (Rp.)
6
28,500.00
13,000.00
-
-
41,500.00
53,900.00
32,688.75
7,030.00
93,618.75
-
135,118.75
-
135,118.75
28,500.00
13,000.00
-
-
41,500.00
53,900.00
19,837.50
7,955.00
81,692.50
-
123,192.50
-
123,192.50
28,500.00
19,500.00
-
-
48,000.00
17,636.40
3,700.00
21,336.40
-
69,336.40
-
69,336.40
Jumlah Harga (Rp.)
6
28,500.00
19,500.00
-
-
48,000.00
10,764.00
4,440.00
15,204.00
-
63,204.00
-
63,204.00
19,000.00
13,000.00
-
-
32,000.00
5,606.25
5,606.25
-
37,606.25
-
37,606.25
570,000.00
2,340,000.00
-
-
2,910,000.00
5,400,000.00
27,500.00
49,500.00
5,477,000.00
-
8,387,000.00
-
8,387,000.00
Jumlah Harga (Rp.)
6
95,000.00
390,000.00
-
-
485,000.00
220,000.00
24,750.00
244,750.00
-
729,750.00
-
729,750.00
76,000.00
312,000.00
-
-
388,000.00
132,000.00
14,850.00
130,240.00
277,090.00
-
665,090.00
-
665,090.00
1,425.00
19,500.00
-
-
20,925.00
-
4,620.00
4,620.00
-
25,545.00
-
25,545.00
Jumlah Harga (Rp.)
6
636,500.00
2,613,000.00
-
-
3,249,500.00
5,400,000.00
181,500.00
123,200.00
5,704,700.00
-
8,954,200.00
-
8,954,200.00
636,500.00
2,613,000.00
-
-
3,249,500.00
4,950,000.00
181,500.00
66,000.00
5,197,500.00
-
8,447,000.00
-
8,447,000.00
19,000.00
39,000.00
-
-
58,000.00
73,350.00
5,500.00
78,850.00
-
136,850.00
-
136,850.00
Jumlah Harga (Rp.)
6
9,500.00
26,000.00
-
-
35,500.00
60,500.00
1,100.00
61,600.00
-
97,100.00
-
97,100.00
19,000.00
13,000.00
-
-
32,000.00
75,174.00
3,150.00
78,324.00
-
110,324.00
110,324.00
23,750.00
19,500.00
-
-
43,250.00
54,450.00
1,500.00
55,950.00
-
99,200.00
99,200.00
Jumlah Harga (Rp.)
6
11,400.00
7,800.00
-
-
19,200.00
70,686.00
3,150.00
73,836.00
-
93,036.00
93,036.00
1,425.00
9,100.00
-
-
10,525.00
54,450.00
1,500.00
55,950.00
-
66,475.00
66,475.00
47,500.00
52,000.00
-
-
99,500.00
30,800.00
21,780.00
1,760.00
3,000.00
57,340.00
-
156,840.00
156,840.00
Jumlah Harga (Rp.)
6
7,600.00
16,250.00
-
-
23,850.00
21,780.00
1,650.00
23,430.00
-
47,280.00
47,280.00
9,500.00
13,000.00
-
-
22,500.00
39,187.50
825.00
40,012.50
-
62,512.50
-
62,512.50
9,500.00
6,500.00
-
-
16,000.00
35,635.60
4,235.00
39,870.60
-
55,870.60
-
55,870.60
Jumlah Harga (Rp.)
6
4,750.00
6,500.00
-
-
11,250.00
17,325.00
2,062.50
19,387.50
-
30,637.50
-
30,637.50
36,385.00
49,790.00
-
-
86,175.00
484,044.00
59,400.00
543,444.00
-
629,619.00
-
629,619.00
62,961.90
66,500.00
45,500.00
-
-
112,000.00
82,875.00
16,905.00
8,325.00
12,480.00
120,585.00
-
232,585.00
-
232,585.00
Jumlah Harga (Rp.)
6
66,500.00
45,500.00
-
-
112,000.00
82,812.50
17,940.00
8,325.00
15,552.00
124,629.50
-
236,629.50
236,629.50
950.00
65,000.00
-
-
65,950.00
192,500.00
192,500.00
-
258,450.00
-
258,450.00
1,425.00
19,500.00
-
-
20,925.00
38,500.00
38,500.00
-
59,425.00
-
59,425.00
Jumlah Harga (Rp.)
6
950.00
13,000.00
-
-
13,950.00
49,500.00
49,500.00
-
63,450.00
-
63,450.00
9,500.00
26,000.00
-
-
35,500.00
33,000.00
33,000.00
-
68,500.00
-
68,500.00
1,425.00
19,500.00
-
-
20,925.00
16,500.00
16,500.00
-
37,425.00
-
37,425.00
Jumlah Harga (Rp.)
6
1,900.00
26,000.00
-
-
27,900.00
22,000.00
22,000.00
-
49,900.00
-
49,900.00
130,000.00
130,000.00
27,000.00
211,200.00
3,000.00
4,000.00
3,000.00
24,000.00
1,000.00
21,000.00
10,000.00
304,200.00
-
434,200.00
434,200.00
130,000.00
130,000.00
27,000.00
132,000.00
1,000.00
2,000.00
24,000.00
47,500.00
233,500.00
-
363,500.00
363,500.00
Jumlah Harga (Rp.)
6
6,650.00
11,700.00
-
-
18,350.00
12,000.00
3,150.00
6,120.00
16,848.00
288.00
522.00
960.00
39,888.00
-
58,238.00
-
58,238.00
1,900.00
8,190.00
-
-
10,090.00
2,100.00
3,600.00
8,736.00
14,436.00
-
24,526.00
-
24,526.00
2,660.00
5,460.00
-
-
8,120.00
4,320.00
6,048.00
10,368.00
-
18,488.00
-
18,488.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
C. BAHAN PEREKAT
1 Semen PC @ 40 Kg @Rp. 69,000.00 /
Semen PC @ 40 Kg @Rp. 1,725.00 /
2 Semen Putih @ 40 Kg @Rp. 352,000.00 /
@Rp. 9,600.00 /
3 Tepung Gypsum @Rp. 13,750.00 /
4 Lem Kayu @Rp. 49,500.00 /
5 Air @Rp. 200.00 /
Page 57 of 147
6 Triplek 120 x 240 mm, tbl. 9 mm @Rp. 170,500.00 /
Page 58 of 147
7 Gypsum Board 120 x 240 mm, tbl. 9 mm @Rp. 97,900.00 /
8 GRC Board 120 x 240 mm, tbl. 12 mm @Rp. 115,500.00 /
9 Profil Plafond Gypsum 2" @Rp. 11,000.00 /
10 Profil Plafond Gypsum 4" @Rp. 16,500.00 /
11 Asbes Atrisco 1 x 1 m @Rp. 27,500.00 /
12 Rangka Furing 0,35 mm @Rp. 13,200.00 /
F. PENUTUP ATAP
1 Seng Plat BJLS @Rp. 68,200.00 /
2 Atap Genteng Metal # 0,30 mm @Rp. 73,700.00 /
3 Rabung Atap Metal #0,30 mm @Rp. 49,500.00 /
4 Atap Metal Bergelombang #0,30 mm @Rp. 69,300.00 /
5 Rabung Atap Metal Bergelombang #0,30 mm @Rp. 38,500.00 /
6 Screw Truss 12-14 x 20 @Rp. 350.00 /
7 Screw Truss 10-16 x 16 @Rp. 250.00 /
8 Truss C. 75.t =0,75mm @Rp. 15,400.00 /
9 Topspan Truss Π. t=0,5 mm @Rp. 9,900.00 /
10 Dynabolt 12 x 199 mm @Rp. 4,400.00 /
11 Listplank GRC @Rp. 19,800.00 /
G. BESI / ALUMUNIUM
1 Besi Beton @Rp. 14,850.00 /
2 Kawat Beton @Rp. 22,000.00 /
3 Paku biasa @Rp. 22,000.00 /
4 Paku triplek @Rp. 27,500.00 /
5 Paku skrup @Rp. 38,500.00 /
6 Skrup @Rp. 275.00 /
7 Daun pintu allumunium @Rp. 440,000.00 /
8 Rangka Besi Furing @Rp. 9,900.00 /
9 Besi Strip @Rp. 12,100.00 /
Page 59 of 147
6 Hak Angin jendela @Rp. 16,500.00 /
7 Pegangan pintu/door holder @Rp. 82,500.00 /
8 Handle Jendela @Rp. 16,500.00 /
9 Kaca Polos 5 mm @Rp. 162,800.00 /
10 Gerendel Biasa Uk. 6" @Rp. 27,500.00 /
Page 60 of 147
I. CAT / MINYAK
1 Cat menie @Rp. 60,000.00 /
2 Cat Dasar @Rp. 36,000.00 /
3 Cat Tembok Interior setara Vinilex @Rp. 33,600.00 /
4 Cat Tembok Eksterior (Weather Shield) @Rp. 132,000.00 /
5 Cat Kilat (setara bee brand) @Rp. 64,800.00 /
6 Vernis @Rp. 48,000.00 /
7 Dempul cat @Rp. 28,800.00 /
8 Ampelas @Rp. 4,800.00 /
9 Kuas 2" @Rp. 28,800.00 /
10 Plamur @Rp. 21,000.00 /
11 Flincote @Rp. 57,600.00 /
12 Flincote @Rp. 57,600.00 /
13 Soda Api @Rp. 9,000.00 /
14 Tinner @Rp. 17,400.00 /
15 Sealer @Rp. 38,400.00 /
16 Minyak Cat @Rp. 16,800.00 /
17 Minyak Bekesting @Rp. 4,200.00 /
J. PIPA / SANITAIR
1 Pipa PVC 1/2" @Rp. 11,000.00 /
2 Pipa PVC 3/4" @Rp. 14,300.00 /
3 Pipa PVC 2 1/2" @Rp. 20,350.00 /
4 Pipa PVC 3" @Rp. 25,850.00 /
5 Pipa PVC 4" @Rp. 84,150.00 /
6 Pipa Galvanis 2,5" @Rp. 109,670.00 /
7 Kran Air @Rp. 71,500.00 /
8 Floor Drain @Rp. 60,500.00 /
9 Kloset Jongkok @Rp. 715,000.00 /
10 Kloset Duduk @Rp. 71,500.00 /
11 Washtafel (Lengkap) Standart @Rp. 4,400.00 /
12 Bak Fiberlass @Rp. 0.00 /
13 Kran Air 1/2" @Rp. 23,000.00 /
14 Floor Drain @Rp. 60,500.00 /
15 Seal tape @Rp. 2,000.00 /
K. LISTRIK / AKSESORIS
1 Kabel NYA 3 x 1,5 mm @Rp. 8,800.00 /
2 Kabel NYA 2 x 1,5 mm @Rp. 7,000.00 /
3 Pipa Conduit @Rp. 9,000.00 /
4 Lampu SL @18 Watt @Rp. 38,000.00 /
5 Fitting @Rp. 10,000.00 /
6 Saklar @Rp. 21,000.00 /
Page 61 of 147
7 Stop Kontak @Rp. 33,000.00 /
8 Mini Circuit Bracker (MCB) @Rp. 47,500.00 /
9 T Dus @Rp. 1,000.00 /
10 L Bow @Rp. 1,000.00 /
11 Las Dop @Rp. 1,000.00 /
12 Klem @Rp. 1,000.00 /
13 Mongkok @Rp. 1,000.00 /
Page 62 of 147
AH
SATUAN
Hari
Hari
Hari
Hari
M3
M3
M3
Kg
M3
M3
M3
Kg
M3
Bh
Zak
Kg
Zak
Kg
Kg
Kg
Ltr
M3
M3
M3
M3
M3
M3
Btg
Lbr
Page 63 of 147
Lbr
Page 64 of 147
Lbr
Lbr
M'
M'
Bh
M'
Bh
Bh
Bh
Bh
M2
M2
M'
M2
M'
Bh
Bh
M'
M'
Bh
M'
Kg
Kg
Kg
Kg
Kg
Bh
M2
M'
Kg
Set
Psg
Psg
Psg
Bh
Page 65 of 147
Bh
Bh
Bh
M2
Bh
Page 66 of 147
Kg
Kg
Kg
Kg
Kg
Ltr
Kg
Lbr
Bh
Kg
Kg
Kg
Kg
Ltr
Kg
Ltr
Ltr
M'
M'
M'
M'
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M'
M'
Bh
Bh
Set
Bh
Page 67 of 147
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Page 68 of 147
PE
H
V
Luas Penampang Po
L. atas
0.30
Page 69 of 147
PE
Page 70 of 147
PE
0.70
Page 71 of 147
PE
0.00 0.2
0.10
0.15
0.60
Arah X
0.20
0.30 0.30
0.10 0.10
0.05 0.05
0.55
arah Y 0.20
Page 72 of 147
PE
0.30 0.30
0.10 0.10
0.05 0.05
0.55
Page 73 of 147
PE
0.20
0.20
0.45
0.10
0.15
0.60
Page 74 of 147
PE
Page 75 of 147
PE
0.20
Panjang Sloof (A+B)
B
H 18.00 18.00 18.00
V 10.00 10.00 10.00
Page 76 of 147
PE
Page 77 of 147
PE
Page 78 of 147
PE
Page 79 of 147
PE
0.13
a 2.00
b 2.00
c 2.00
d 9.00
e 9.00
24.00
Page 80 of 147
PE
9 Ring Balok
Pekerjaan Ring Balok Ruang Kelas Ukuran 0.13 x 0.15 m
Ring Balok Ruang Kelas
0.15
0.13
Horizontal Vertikal
a 18.00 a 8.00
b 18.00 b 8.00
c c 8.00
36.00 24.00
Page 81 of 147
PE
Page 82 of 147
PE
10 Ring Balok
Pekerjaan Ring Balok Tembok Layar Ukuran 0.13 x 0.15 m
Ring Balok Tembok Layar
0.15
0.13
Horizontal Vertikal
b 5.58 a
c 5.58 b
11.16
Page 83 of 147
PE
Page 84 of 147
PE
11 Bangku Terras
Pekerjaan Plat Beton Bertulang untuk Bangku di Selasar, Tbl. 10 cm Ukuran 0.4 x 0.1 m
Plat Beton Bertulang untuk Bangku di Selasar, Tbl. 10 cm
0.10
0.40
K2 K2 K2
6.20
Lebar = 0.40 m
Panjang = 6.20 m
Tinggi = 0.10 m
Jumlah = 2.00 m
12.40 m'
Arah Memanjang
0.05 0.05
6.15
Arah Melintang
0.05 0.05
0.35
Page 85 of 147
PE
Pasangan Batu Bata Dibawah Bangku Terras Plesteran Pasangan Batu Bata Dibawah Bang
Panjang 8.00 Panjang 8.00
Tinggi 0.57 Tinggi 0.57
Luas 4.56 m2 Luas 4.56 m2
Keramik 40x40
Panjang 12.40
Lebar 0.40
Luas 4.96 m2
Page 86 of 147
PE
12 PEKERJAAN LANTAI
Page 87 of 147
PE
Page 88 of 147
PE
Pekerjaan Dinding Pasangan 1/2 Batu Bata Camp. 1:2 A+B = 28.20
Arah Horizontal Arah Vertikal
Panjang Tinggi Jlh Luas Panjang Tinggi
a 2.80 0.50 12.00 16.80 m2 a 4.80 0.50
b 2.80 0.50
A 16.80
Pekerjaan Dinding Pasangan 1/2 Batu Bata Camp. 1:4 E-F = 183.17
Arah Horizontal Arah Vertikal
Panjang Tinggi Jlh Luas Panjang Tinggi
a 2.80 3.50 12.00 117.60 m2 c 4.80 3.50
m2 d 2.85 3.50
117.60 m2
b Tembok Layar 21.92 m2
E Total Luas a+b+c+d = 219.85 m2
Page 89 of 147
PE
Page 90 of 147
PE
Page 91 of 147
PE
15 PEKERJAAN PLAFOND
Page 92 of 147
PE
Page 93 of 147
BACK UP DATA
DINAS PENDIDIKAN PROVINSI SUMATERA UTARA
PEMBANGUNAN RUANG KELAS BARU BESERTA PERABOTNYA
DANA ALOKASI KUSUS (DAK) TAHUN 2019
PERHIT
ANAAN
No. b (m) x p (m)
Page 94 of 147
BACK UP DATA
DINAS PENDIDIKAN PROVINSI SUMATERA UTARA
PEMBANGUNAN RUANG KELAS BARU BESERTA PERABOTNYA
DANA ALOKASI KUSUS (DAK) TAHUN 2019
PERHIT
ANAAN
No. b (m) x p (m)
Page 95 of 147
BACK UP DATA
DINAS PENDIDIKAN PROVINSI SUMATERA UTARA
PEMBANGUNAN RUANG KELAS BARU BESERTA PERABOTNYA
DANA ALOKASI KUSUS (DAK) TAHUN 2019
PERHIT
ANAAN
No. b (m) x p (m)
Page 96 of 147
BACK UP DATA
DINAS PENDIDIKAN PROVINSI SUMATERA UTARA
PEMBANGUNAN RUANG KELAS BARU BESERTA PERABOTNYA
DANA ALOKASI KUSUS (DAK) TAHUN 2019
PERHIT
ANAAN
No. b (m) x p (m)
a. Beton Cor Pondasi
Jlh = 7.00 Bh 0.60 x 0.60
0.60 + 0.20
2.00
0.10
0.15
Page 97 of 147
BACK UP DATA
DINAS PENDIDIKAN PROVINSI SUMATERA UTARA
PEMBANGUNAN RUANG KELAS BARU BESERTA PERABOTNYA
DANA ALOKASI KUSUS (DAK) TAHUN 2019
PERHIT
ANAAN
No. b (m) x p (m)
Berat Besi 0.88
Arah - Y
c. Bekisting 0.25
Page 98 of 147
BACK UP DATA
DINAS PENDIDIKAN PROVINSI SUMATERA UTARA
PEMBANGUNAN RUANG KELAS BARU BESERTA PERABOTNYA
DANA ALOKASI KUSUS (DAK) TAHUN 2019
PERHIT
ANAAN
No. b (m) x p (m)
0.48 40 x d
b. Pembesian
Berat Besi Tulangan Utama
0.25 Sloof
Besi Dia.
Berat Besi Dia 12 mm
Jumlah Tulangan
Panjang Tulangan
Total Panjang Tulangan
0.10 Berat besi Utama
0.15
0.05 Berat Besi Sengkang
0.15 Besi Dia.
Berat Besi Dia 8 mm
Jumlah Tulangan
Panjang Tulangan
Total Panjang Tulangan
Berat Besi Sengkang
Page 99 of 147
BACK UP DATA
DINAS PENDIDIKAN PROVINSI SUMATERA UTARA
PEMBANGUNAN RUANG KELAS BARU BESERTA PERABOTNYA
DANA ALOKASI KUSUS (DAK) TAHUN 2019
PERHIT
ANAAN
No. b (m) x p (m)
c. Bekisting
0.40 x 2.00
PERHIT
ANAAN
No. b (m) x p (m)
a. Galian tanah
= 18.60 m' 0.20 x 0.25
= 84.00 m'
c. Pembesian
= 54.00 Berat Besi Tulangan Utama
= 30.00 + Besi Dia.
B 84.00 m' Berat Besi Dia 12 mm
Jumlah Tulangan
Panjang Tulangan
Total Panjang Tulangan
Total Berat besi
PERHIT
ANAAN
No. b (m) x p (m)
c. Bekisting
0.25 x 2.00
PERHIT
ANAAN
No. b (m) x p (m)
4.00 m
a. Beton Cor
0.20 x 0.20
0.36 30 x d
b. Pembesian
0.20
Berat Besi Tulangan Utama
0.15 Balok
Besi Dia.
0.20 Berat Besi Dia 12 mm
Jumlah Tulangan
Panjang Tulangan
4.00
Total Panjang Tulangan
Berat besi Utama
Berat Besi Sengkang
Besi Dia.
Berat Besi Dia 8 mm
Jumlah Tulangan
Sloof
0.25 Panjang Tulangan
Total Panjang Tulangan
Berat Besi Sengkang
0.50
Total Berat besi
0.05
0.12 c. Bekisting
0.20 x 4.00
PERHIT
ANAAN
No. b (m) x p (m)
4.00 m
a. Beton Cor
0.20 x 0.20
0.36 30 x d
b. Pembesian
0.20
Berat Besi Tulangan Utama
0.15 Balok
Besi Dia.
0.20 Berat Besi Dia 12 mm
Jumlah Tulangan
Panjang Tulangan
4.00
Total Panjang Tulangan
Berat besi Utama
Berat Besi Sengkang
Besi Dia.
Berat Besi Dia 8 mm
Jumlah Tulangan
Sloof
0.25 Panjang Tulangan
Total Panjang Tulangan
Berat Besi Sengkang
0.65
Total Berat besi
0.05
0.15 c. Bekisting
0.20 x 4.00
PERHIT
ANAAN
No. b (m) x p (m)
a. Beton Cor
0.13 x 0.20
b. Pembesian
Berat Besi Tulangan Utama
Besi Diameter
Berat Besi Dia 10 mm
Jumlah Tulangan
Panjang Tulangan
Total Panjang Tulangan
Total Berat besi
Berat Besi Tulangan Sengkang (Begel)
Besi Dia.
Berat Besi Dia 8 mm
Jumlah Tulangan
Panjang Tulangan
Total Panjang Tulangan
Berat Besi Sengkang
c. Bekisting
0.20 x 2.00
PERHIT
ANAAN
No. b (m) x p (m)
a. Beton Cor
0.13 x 0.15
b. Pembesian
Berat Besi Tulangan Utama
Besi Diameter
Berat Besi Dia 12 mm
Jumlah Tulangan
Panjang Tulangan
Total Panjang Tulangan
Total Berat besi
Berat Besi Tulangan Sengkang (Begel)
Besi Dia.
Berat Besi Dia 8 mm
Jumlah Tulangan
Panjang Tulangan
Total Panjang Tulangan
Berat Besi Sengkang
c. Bekisting
0.15 x 2.00
PERHIT
ANAAN
No. b (m) x p (m)
PERHIT
ANAAN
No. b (m) x p (m)
a. Beton Cor
0.13 x 0.15
b. Pembesian
Berat Besi Tulangan Utama
Besi Diameter
Berat Besi Dia 12 mm
Jumlah Tulangan
Panjang Tulangan
Total Panjang Tulangan
Total Berat besi
Berat Besi Tulangan Sengkang (Begel)
Besi Dia.
Berat Besi Dia 8 mm
Jumlah Tulangan
Panjang Tulangan
Total Panjang Tulangan
Berat Besi Sengkang
c. Bekisting
0.15 x 2.00
PERHIT
ANAAN
No. b (m) x p (m)
PERHIT
ANAAN
No. b (m) x p (m)
a. Beton Cor
0.40 x 0.10
b. Pembesian
Besi Dia.
Berat Besi Dia 10 mm
Panjang Besi Arah - Memanjang
Besi Dia.
Berat Besi Dia 10 mm
Panjang Besi Arah - Melintang
c. Bekisting
PERHIT
ANAAN
No. b (m) x p (m)
Bata Dibawah Bangku Terras 0.20 + 0.40
PERHIT
ANAAN
No. b (m) x p (m)
a. Ruang Kelas dan Terras Depan
Timbunan Tanah
8.88 x 7.85
20.00 x 2.02
Pasir Urug #5 cm
8.88 x 7.85
20.00 x 2.02
Rabat Beton # 7 cm
8.88 x 7.85
20.00 x 2.02
Keramik40 x 40
8.88 x 7.85
20.00 x 2.02
Pasir Urug #5 cm
8.00 x 0.85
20.00 x 0.85
PERHIT
ANAAN
No. b (m) x p (m)
Rabat Beton # 7 cm
8.00 x 0.85
20.00 x 0.85
Acian Lantai
8.00 x 0.85
20.00 x 0.85
PERHIT
ANAAN
No. b (m) x p (m)
Pasangan batu bata Camp. 1:2
28.20 x
m2 Pasangan batu bata Camp. 1:4
183.17 x
Jlh Luas
3.00 7.20 m2 Plesteran
3.00 4.20 m2
B 11.40 211.37 x
m2
Acian
Jlh Luas 211.37 x
3.00 50.40 m2
3.00 29.93 m2
Pengecatan
211.37 x
Kolom
0.60 x
PERHIT
ANAAN
No. b (m) x p (m)
Rangka Atap Baja Ringan
Rabung Atap
20.20
Listplank GRC
13.46
PERHIT
ANAAN
No. b (m) x p (m)
PERHIT
ANAAN
No. b (m) x p (m)
a. Plafond Gypsum 9 mm (Setara Jaya Board)
Ruang Kelas dan Terras Depan
8.88 x 7.85
20.00 x 2.02
b Tritisan Depan Dan Belakang
20.00 x 0.85
c Tritisan Samping Kanan Dan Kiri
6.61 x 0.85
PERHIT
ANAAN
No. b (m) x p (m)
= 48.00 M3
= 2.40 M3
= 4.80 M3
= 16.20 M3
inggian Lantai
x x = - M3
= 3.60 M3
= 0.17 M3
= 0.17 M3
= 2.49 M3
= 0.65 M3
= 12.00 mm
= 0.88 Kg
P.1 = 1.65
Total = 1.65 m
P.2 = 1.65
Total = 1.65 m
= 4.20 M2
= 12.00 mm
= 0.88 Kg
= 4.00 Bh
= 1.63 m
= 6.52 m
0.88 x 6.52 x 7.00 = 40.16 Kg
= 8.00 mm
= 0.39 Kg
0.45 / 0.15 = 4.00 Bh
= 0.72 m
= 2.88 m
0.39 x 2.88 x 7.00 = 7.86 Kg
= 0.93 M3
= 4.20 M3
= 12.00 mm
= 0.88 Kg
= 4.00 Bh
= 1.09 m
= 4.35 m
0.88 x 4.35 x 84.00 = 321.39 Kg
= 8.00 mm
= 0.39 Kg
1.00 / 0.15 = 8.00 Bh
= 0.82 m
= 6.56 m
0.39 x 6.56 x 84.00 = 214.91 Kg
= 42.00 M2
= 2.72 M3
= 12.00 mm
= 0.88 Kg
= 4.00 Bh
= 5.43 m
4.00 x 5.43 = 21.72 m
0.88 x 21.72 x 17.00 = 324.93 Kg
= 8.00 mm
= 0.39 Kg
4.25 / 0.15 = 30.00 Bh
= 0.70 m
= 21.00 m
0.39 x 21.00 x 17.00 = 139.23 Kg
= 1.12 M3
= 12.00 mm
= 0.88 Kg
= 4.00 Bh
= 5.61 m
4.00 x 5.61 = 22.44 m
0.88 x 22.44 x 7.00 = 138.23 Kg
= 8.00 mm
= 0.39 Kg
4.25 / 0.15 = 30.00 Bh
= 0.70 m
= 21.00 m
0.39 x 21.00 x 7.00 = 57.33 Kg
= 10.00 mm
= 0.61 Kg
= 4.00 Bh
= 1.05 m
= 4.20 m
0.61 x 4.20 x 24.00 = 61.49 Kg
= 8.00 mm
= 0.39 Kg
1.00 / 0.15 = 8.00 Bh
= 0.46 m
= 3.68 m
0.39 x 3.68 x 24.00 = 34.44 Kg
= 12.00 mm
= 0.88 Kg
= 4.00 Bh
= 1.05 m
= 4.20 m
0.88 x 4.20 x 60.00 = 221.76 Kg
= 8.00 mm
= 0.39 Kg
1.00 / 0.15 = 8.00 Bh
= 0.36 m
= 2.88 m
0.39 x 2.88 x 60.00 = 67.39 Kg
= 12.00 mm
= 0.88 Kg
= 4.00 Bh
= 1.05 m
= 4.20 m
0.88 x 4.20 x 22.32 = 82.49 Kg
= 8.00 mm
= 0.39 Kg
1.00 / 0.15 = 8.00 Bh
= 0.36 m
= 2.88 m
0.39 x 2.88 x 22.32 = 25.07 Kg
M3
0.10 x 12.40 = 0.50 M3
= 0.50 M3
= 10.00 mm
= 0.61 Kg
P.1 = 6.25
Total = 6.25 m
= 10.00 mm
= 0.61 Kg
P.1 = 0.45
Total = 0.45 m
x x 2.00 = 422.73 M²
= 422.73 M²
x x 2.00 = 422.73 M²
= 422.73 M²
x x 2.00 = 422.73 M²
= 422.73 M²
464.73 M²
Jalusi
Panjang Jlh Btng Panjang Btng
0.6 3 1.8
0 8 0
1.8
Volume Kusen
Lebar Tebal Panjang
0.05 0.13 11.04 0.07176 m3
0.05 0.13 1.8 0.0117 m3
0.08346 m3
Daun Jendela
Lebar Tinggi Luas
1.35 0.06 3 0.243 M2
M2
0.243 M2
m2
Luas
3.96 m2
2.28 m2
6.24 m2
5.992
0.3144 m2
12.55 m2
25.1 m2
m2
Luas
4.62 m2
Luas
0.54 m2
5.16 m2
51.624 m2
Total Luas
1.46 m2
1.46 m2
14.58 m2
25.1 m2
51.624 m2
14.58 m2
91.304 m2
PINTU JENDELA DAN VENTILASI RUANG KELAS BARU
1 Unit Membuat Pintu P1 Kode Analisa
No Uraian Satuan Volume Harga Satuan
Bahan
1 Engsel Pintu bh A.4.6.2.5 6.00 Rp 38,500.00
2 Grendle Tanam Pintu bh A.4.6.2.6.A 3.00 Rp 27,500.00
3 Kunci Tanam Pintu bh A.4.6.2.2 1.00 Rp 258,450.00
4 Handle Pintu bh Unit Price 2.00 Rp 225,000.00
5 Pemasangan Kusen Kayu Kelas II M3 A. 4.6.1.2 0.09 Rp 8,387,000.00
Pembuatan dan pemasangan 1 m2 daun
6 m2 A.4.6.1.5 3.00 Rp 729,750.00
pintu panel, kayu kelas I atau II
7 Pemasangan jendela kaca, kayu kelas II m2 A. 4.6.1.6 0.24 Rp 665,090.00
8 Kaca 5 mm Polos untuk Jendela m2 A.4.6.2.17. 0.30 Rp 25,545.00
9 Engsel Jendela bh A.4.6.2.6 2.00 Rp 63,450.00
10 Handle Jendela bh Unit Price 1.00 Rp 16,500.00
11 Grendle Jendela bh A.4.6.2.11 1.00 Rp 49,900.00
12 Hak Angin bh A.4.6.2.9 2.00 Rp 37,425.00
Total Harga
Rp 231,000.00
Rp 82,500.00
Rp 258,450.00
Rp 450,000.00
Rp 765,942.78
Rp 2,186,331.00
Rp 161,616.87
Rp 7,663.50
Rp 126,900.00
Rp 16,500.00
Rp 49,900.00
Rp 74,850.00
Rp 4,411,654.15
Hit.II
Jumlah
Rp 380,700.00
Rp 49,500.00
Rp 149,700.00
Rp 224,550.00
Rp 699,979.02
Rp 161,616.87
Rp 25,672.73
Rp 1,691,718.62
Rp 1,691,718.62