Anda di halaman 1dari 7

KETENTUAN PENGIRIMAN PROPOSAL

1. Proposal harus disesuaikan dan dilengkapi dengan format proposal yang sudah diberikan oleh
Asisten (format terlampir).
2. Proposal dikumpulkan maksimal pada hari Selasa, 29 Agustus 2017 pukul 23.59 WGmail ke
email pdevsimbi@gmail.com dengan format file .pdf
3. Diketik dengan font Times New Roman ukuran 12 dengan spasi 1,5. Margin 3,2,2,2.
4. Proposal dikirimkan dengan subject dan nama file: Proposal_FRI-XXX_Kode Kategori
Produk-Kode Controllable Input. Contoh: Proposal_FRI-001_A-1.

Pembagian kategori produk sebagai berikut:


Mainan Alat Bantu Material Handling
Alat Bantu Ajar Mechanical Part
Edukatif Produksi Equipment
FRI 1-2 FRI 3-4 FRI 5-6 FRI 7-8 FRI 9
FRI 10-11 FRI 12-14 FRI 15-17 FRI 18-19 FRI 20-22
FRI 23-25 FRI 26-28 FRI 29-31 FRI 32-34 FRI 35-36
FRI 37-39 FRI 40-42 FRI 43-45 FRI 46-48 FRI 49-50
FRI 51-53 FRI 54-56 FRI 57-59 FRI 60-62 FRI 63-64
FRI 65-67 FRI 68-70 FRI 71-73 FRI 74-76 FRI 77-78
FRI 79-81 FRI 82-84 FRI 85-86 FRI 87-88 FRI 89-90
FRI 91-93 FRI 94-95 FRI 96-97 FRI 98-99 FRI 100-102
FRI 103-105 FRI 106-108 FRI 109-110 FRI 111-113 FRI 114-116
FRI 117-119 FRI 120-122 FRI 123-125 FRI 126-128 FRI 129-131
FRI 132-134 FRI 135-137 FRI 138-139 FRI 140-141 FRI 142-144
FRI 145-147 FRI 148-149 FRI 150-151 FRI 152-153 FRI 154-156
FRI 157-158 FRI 159-160 FRI 161-162 FRI 163-164 FRI 165-167

Kategori Produk Kode


Mainan Edukatif A
Alat Bantu Produksi B
Alat Material Handling Equipment C

Alat Bantu Ajar (Pelajar/Mahasiswa) D

Mechanical Parts E
Perubahan Jumlah Perubahan Penjadwalan
Perubahan Jumlah Mesin
Operator Shift
FRI 1-3 FRI 4-6 FRI 7-9
FRI 10-13 FRI 14-17 FRI 18-22
FRI 23-27 FRI 28-32 FRI 33-36
FRI 37-41 FRI 42-46 FRI 47-50
FRI 51-55 FRI 56-60 FRI 61-64
FRI 65-69 FRI 70-74 FRI 75-78
FRI 79-83 FRI 84-87 FRI 88-90
FRI 91-95 FRI 96-99 FRI 100-102
FRI 103-107 FRI 108-112 FRI 113-116
FRI 117-121 FRI 122-126 FRI 127-131
FRI 132-136 FRI 137-140 FRI 141-144
FRI 145-149 FRI 150-153 FRI 154-156
FRI 157-160 FRI 161-164 FRI 165-167

Controllable Input Kode


Perubahan Jumlah Operator 1
Perubahan Jumlah Mesin 2
Perubahan Penjadwalan Shift 3

5. Proposal yang tidak memenuhi ketentuan yang ada tidak akan diperiksa oleh Asisten.
6. Untuk kelas INT dan EBC proposal dibuat dalam Bahasa Inggris.
PROPOSAL PENGAJUAN PRODUK
PRAKTIKUM PENGEMBANGAN PRODUK DAN
SIMULASI INDUSTRI

Kelompok:
FRI-XXX
Kategori:
(A-1)

Anggota:
Nama (NIM/Kelas)
Nama (NIM/Kelas)
Nama (NIM/Kelas)

FAKULTAS REKAYASA INDUSTRI


UNIVERSITAS TELKOM
BANDUNG
2017
BAB I PENDAHULUAN

I.1. Latar Belakang


Di bagian ini dijelaskan latar belakang mengapa produk Anda perlu dibuat disertai data-data atau fakta
yang mendukung.

I.2. Tujuan
Di bagian ini disebutkan tujuan-tujuan utama yang akan dicapai dengan adanya pembuatan produk
yang Anda ajukan.

I.3. Deskripsi Produk


Nama Produk : Menjelaskan nama produk yang akan dibuat.
Deskripsi Umum : Menjelaskan fungsi spesifik produk yang akan dibuat

I.4 Sketsa Produk


Di bagian ini dicantumkan sketsa dari produk yang akan dibuat (boleh berupa sketsa tulis ataupun tiga
dimensi menggunakan CAD).

I.5 Diferensiasi Produk


Di bagian ini disebutkan fitur yang membuat produk Anda berbeda dengan produk yang ada di pasaran.
BAB II PERANCANGAN MODEL SIMULASI

II.1. Pembuatan Study Case

VARSITY Company produces cooking equipment, one of them is knife, named … .


VARSITY Company is a leader company in this country in producing this product, so the
company always effort to fulfill the demand. While the demand from previous year is 1000
and the demand from this year is 1500.These knife produced by using some machines, such
as cutting machines and heater. This knife using …. Operators in its making process. The
detail for all the operators are:

No. Workstation Operator Time Process Explanation Cost

Operator will doing the


drawing process of the Rp.
1. Drawing Process 1 8 min
knife on the stainless 40.000/day
steel sheet

Operator will do the


Rp
2. Cutting Process 2 20 min cutting process by using
100.000/day
saw.

Operator will do the


Hardening and hardening and quenching Rp
3. 1 2 hr
Quenching operation by heating and 80.000/day
cooling the material.

Operator will do the


Polishing and polishing and sharpening Rp
4. 1 10 min
Sharpening operation by using 60.000/day
grinding wheels.
This station is where all
the component (blade, Rp
5. Assembly 2 10 min
cutting board, and 5.000/unit
handle) assembly.

In this station the


6. Inspection 1 2 min finished product will be -
checked.

VARSITY Company not manufacture all of their part of product, but also order other part
from the other company. And the price for 1 unit of knife is Rp. 100.000,-

So here is the description of component purchase cost and arrival time of each unit:

No Component Arrival Time Price/unit

1 Cutting Board 4 minute Rp6.000,-

2 Handle 3 minute Rp10.000,-

VARSITY Company has to order from supplier. And the company need to pay Rp. 2.000/set
of unit.

The working time is 9 hours, started from 08.00 until 17.00 for 6 days in a week (Monday
– Saturday). And rest time is 1 hour, started from 12.00 until 13.00.

For increasing the productivity VARSITY Company considering to buy a new machines to
cutting the blades so it can reduce the cost for operator and reduce the time for the process
operation.

II.2. Tiga Komponen Rich Picture


II.2.1 Elemen Struktur
Berisikan semua hal yang bersifat objek dan subjek dalam suatu permasalahan sistem.
II.2.2 Elemen Proses
Berisikan segala keg iatan/proses yang terjadi dalam suatu sistem.
II.2.3 Keterkaitan
Merupakan keterangan yang menghubungkan elemen struktur dan elemen proses, yang
biasanya berupa kalimat yang menyatakan kuantitatif.

II.3. Rich Picture


Gambarkan rich picture semenarik mungkin dan berhubungan dengan study case yang
telah dibuat dan tanpa menghilangkan 3 komponen rich picture yang sudah disebutkan.

II.4. Trade-off
Tentukan trade-off pada rich picture tersebut, sesuai dengan tujuan yang telah dijabarkan
dan cara pencapaiannya.

II.5. Hierarki Stakeholder, Hierarki Sistem dan 6 Elemen Masalah


II.5.1 Hierarki Stkaeholder
a. Problem owner : The owner of Cihuy98 Corp.
b. Problem User : HR Manager, Production Manager, and Financial Manager
c. Problem Customer : Consumen
d. Pronlem Solver : Industrial Engineering College St
II.5.2 Hierarki Sistem
Berisikan 3 poin seperti yang sudah pernah dipelajari pada Mata Kuliah Pemodelan Sistem
dan Simulasi Komputer. Merupakan deskripsi ruang lingkup sistem berdasar keterkaitan sistem
yang akan disimulasikan.
II.5.3 6 Elemen Masalah
Berisikan 6 poin elemen seperti yang sudah pernah dipelajari pada Mata Kuliah Pemodelan
Sistem dan Simulasi Komputer.

Anda mungkin juga menyukai