JUMLAH HARGA
NO URAIAN PEKERJAAN
JUMLAH UPAH (Rp) JUMLAH BAHAN (Rp)
1 2 3 4
Terbilang : ## Seratus Enam Puluh Empat Juta lima Ratus Delapan Puluh Ribu Rupiah ##
RENCANA ANGGARAN BIAYA
A PEKERJAAN PERSIAPAN
1 Pancangan Galam Ø 10 -12 cm panjang 2 meter - 70.00 Batang 9,000.00 6,000.00 630,000.00 420,000.00
2 Pancangan Galam Ø 10 -12 cm panjang 4 meter - 188.00 Batang 9,000.00 13,000.00 1,692,000.00 2,444,000.00
3 Pondasi Tiang Ulin Ukuran. 5/7. panjang 4 meter 3 32.00 Batang 0.00 110,000.00 0.00 3,520,000.00
4 Sunduk Tiang Ulin Ukuran. 5/7. panjang 0,5 meter 4 96.00 Batang 0.00 8,000.00 0.00 768,000.00
5 Suai Ulin Ukuran. 4/6. panjang 4 meter 5 10.00 Batang 0.00 27,000.00 0.00 270,000.00
6 Suai Ulin Ukuran. 4/6. panjang 2 meter 6 15.00 Batang 0.00 18,000.00 0.00 270,000.00
7 Baut Ø 12 mm. Panjang = 10 cm 7 50.00 Bh 0.00 1,700.00 0.00 85,000.00
8 Paku 3 Inch 8 3.00 Kg 0.00 25,000.00 0.00 75,000.00
Total - B 2,322,000.00 7,777,000.00
C PEKERJAAN PASANGAN / BETON/ LANTAI
1 Sloof Ulin Ukuran. 5/7. panjang 2 meter 23 20.00 Batang 0.00 48,000.00 0.00 960,000.00
2 Gelagar Ulin Ukuran. 4/6. panjang 4 meter 29 10.00 Batang 0.00 110,000.00 0.00 1,100,000.00
3 Gelagar Ulin Ukuran. 4/6. panjang 2 meter 31 8.00 Batang 0.00 48,000.00 0.00 384,000.00
4 Papan Ulin Ukuran. P=100 cm L=10 cm T=1 cm 32 270.00 Bh 0.00 6,000.00 0.00 1,620,000.00
5 Kolom beton bertulang 15 x 15 cm 30 M3 0.00 0.00
6 Kolom beton bertulang teras 25 x 50 cm 30 M3 0.00 0.00
7 Pas. Batako camp. 1 : 4 8 M2 0.00 0.00
8 Plesteran tebal 15 mm camp. 1 : 4 10 M2 0.00 0.00
9 Lantai keramik 20x20cm WC/KM 18 M2 0.00 0.00
10 Dinding keramik 20x25cm WC 19 M2 0.00 0.00
11 Lantai keramik 30x30 cm 17 M2 0.00 0.00
Total - C 0.00 4,064,000.00
D PEKERJAAN KAP / ATAP
1 Atap genteng metal tebal 0,25 mm 14 100.50 M2 15,700.00 0.00 1,577,889.25 0.00
2 Pemuung metal C - 15.50 M' 0.00 0.00 0.00 0.00
3 Kuda - kuda + suai angin kayu lanan 5/10 cm 15 0.60 M3 984,000.00 #REF! 590,400.00 #REF!
4 Gording + nok gording ky lanan 5/10 - 0.64 M3 0.00 48,000.00 0.00 30,600.00
5 Kasau 5/7 & reng 3/5 13 100.50 M2 11,200.00 4,518.00 1,125,628.00 454,070.30
6 Baut & beugel - 1.00 Ls 0.00 175,000.00 0.00 175,000.00
7 Plafond sejenis kalsiboard 3,5 mm dalam dan luar ruang 12 0.00 M2 66,200.00 111,125.00 0.00 0.00
8 List plafond kayu profil siku lanan 1/4 luar dan dalam ruang - 161.40 M' 0.00 6,200.00 0.00 1,000,680.00
9 Listplank ulin GRC 1x2/20 - 40.10 M' 0.00 27,500.00 0.00 1,102,750.00
10 List tampuk ulin 2/10 - 14.50 M' 0.00 42,000.00 0.00 609,000.00
Total - D 3,293,917.25 #REF!
1 2 3 4 5 6
1 2 3 4 5 6
11 Memasang 1 m2 acian
3.250 kg Portland Cement #REF! -- #REF! --
0.200 OH Pekerja 45,000.00 9,000.00 -- --
0.100 OH Tukang batu 60,000.00 6,000.00 -- --
0.010 OH Kepala tukang 70,000.00 700.00 -- --
0.010 OH Mandor 0.00 0.00 -- --
15,700.00 #REF! #REF!
12 Pekerjaan Plafond Kalsiboard 3.5 mm / M2
0.0230 M3 Balok Lanan 2,875,000.00 -- 66,125.00 --
0.3750 Lbr Kalsiboard 3.5 mm 110,000.00 -- 41,250.00 --
0.1500 Kg Paku 25,000.00 -- 3,750.00 --
0.0800 Kepala Tukang 70,000.00 5,600.00 -- --
0.8000 Tukang 60,000.00 48,000.00 -- --
0.2800 Pekerja 45,000.00 12,600.00 -- --
0.0140 Mandor 0.00 0.00 -- --
66,200.00 111,125.00 177,325.00
13 Pekerjaan Kasau Dan Reng / M2
0.0160 M3 Balok Lanan 48,000.00 -- 768.00 --
0.1500 Kg Paku 25,000.00 -- 3,750.00 --
0.0100 Kepala Tukang 70,000.00 700.00 -- --
0.1000 Tukang 60,000.00 6,000.00 -- --
0.1000 Pekerja 45,000.00 4,500.00 -- --
0.0050 Mandor 0.00 0.00 -- --
11,200.00 4,518.00 15,718.00
14 Pasang Atap Genteng Metal
1.0200 M2 Genteng Metal - -- - -
0.2000 Kg Paku Atap Metal - -- - -
0.2000 Oh Pekerja 45,000.00 9,000.00 -- 9,000.00
0.0010 Oh Mandor - - -- -
0.1000 Oh Tukang Kayu 60,000.00 6,000.00 -- 6,000.00
0.0100 Oh Kepala Tukang 70,000.00 700.00 -- 700.00
15,700.00 - 15,700.00
15 Pekerjaan Rangka Kap Kuda - Kuda Kayu Lanan / M3
1.1000 M3 Balok Lanan 48,000.00 -- 52,800.00 --
15.0000 Kg Besi Strip #REF! -- #REF! --
0.8000 Kg Paku 25,000.00 -- 20,000.00 --
1.2000 Kepala Tukang 70,000.00 84,000.00 -- --
12.0000 Tukang 60,000.00 720,000.00 -- --
4.0000 Pekerja 45,000.00 180,000.00 -- --
0.2000 Mandor 0.00 0.00 -- --
984,000.00 #REF! #REF!
16 Pasangan Kusen Pintu dan Jendela Kayu Bengkirai
1.100 m3 Balok kayu bengkirai 13,000.00 -- 14,300.00 --
1.250 kg Paku 10 cm 25,000.00 -- 31,250.00 --
1.000 kg Lem kayu 0.00 -- 0.00 --
7.000 OH Pekerja 45,000.00 315,000.00 -- --
21.000 OH Tukang kayu 60,000.00 1,260,000.00 -- --
2.100 OH Kepala tukang 70,000.00 147,000.00 -- --
0.350 OH Mandor 0.00 0.00 -- --
1,722,000.00 45,550.00 1,767,550.00
17 Pas. Lantai Keramik 30 x 30 / M2
1.0000 M2 Keramik 30 x 30 (baik) #REF! -- #REF! --
10.000 kg Portland Cement 1,100.00 -- 11,000.00 --
0.045 m3 Pasir Pasang #REF! -- #REF! --
1.500 kg Semen warna 70,000.00 105,000.00 -- --
0.700 OH Pekerja 60,000.00 42,000.00 -- --
0.350 OH Tukang batu 45,000.00 15,750.00 -- --
0.035 OH Kepala tukang - 0.00 -- --
0.035 OH Mandor
162,750.00 #REF! #REF!
18 Pasangan Lantai Keramik Warna Uk. 20 x 20 cm
1.0000 M2 Keramik Warna 20 x 20 cm 155,000.00 -- 155,000.00 --
10.4000 Kg Semen Portland 1,100.00 -- 11,440.00 --
0.0450 M3 Pasir Pasang #REF! -- #REF! --
1.6200 M3 Semen Warna 0.00 -- 0.00 --
0.7000 Oh Pekerja 45,000.00 31,500.00 -- --
0.3500 Oh Tukang Batu 60,000.00 21,000.00 -- --
0.0350 Oh Kepala Tukang 70,000.00 2,450.00 -- --
0.0350 Oh Mandor 0.00 0.00 -- --
54,950.00 #REF! #REF!
HARGA SATUAN UPAH KERJA HARGA BAHAN JUMLAH
NO. URAIAN PEKERJAAN
( Rp) ( Rp) ( Rp) ( Rp)
1 2 3 4 5 6
19 Pasangan Lantai Keramik 20 x 25 cm
1.0000 M2 Ubin Warna 20 x 25 cm #REF! -- #REF! --
9.3000 Kg Semen Portland 1,100.00 -- 10,230.00 --
0.0180 M3 Pasir Pasang #REF! -- #REF! --
1.9400 Kg Semen Warna 0.00 -- 0.00 --
0.9000 Oh Pekerja 45,000.00 40,500.00 -- --
0.4500 Oh Tukang Batu 60,000.00 27,000.00 -- --
0.0450 Oh Kepala Tukang 70,000.00 3,150.00 -- --
0.0450 Oh Mandor 0.00 0.00 -- --
70,650.00 #REF! #REF!
20 1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
0.200 Kg Cat Meni 0.00 -- 0.00 --
0.150 Kg Plamir 110,000.00 -- 16,500.00 --
0.170 Kg Cat Dasar 0.00 -- 0.00 --
0.260 Kg Cat Kilap 0.00 -- 0.00 --
0.070 Oh Pekerja 45,000.00 -- 3,150.00 --
0.009 Oh Tukang Cat 60,000.00 540.00 -- --
0.006 Oh Kepala tukang 70,000.00 420.00 -- --
0.003 Oh Mandor - 0.00 -- --
960.00 19,650.00 20,610.00
21 1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
0.100 Kg Plamir 110,000.00 -- 11,000.00 --
0.100 Kg Cat Dasar 0.00 -- 0.00 --
0.260 Kg Cat Tembok 0.00 -- 0.00 --
0.020 Oh Pekerja 45,000.00 900.00 -- --
0.063 Oh Tukang Cat 60,000.00 3,780.00 -- --
0.006 Oh Kepala tukang 70,000.00 441.00 -- --
0.003 Oh Mandor - 0.00 -- --
5,121.00 11,000.00 16,121.00
22 Pekerjaan Beton Bertulang Camp. 1 : 2 : 3 / M3
6.7200 Zak Semen PC 55,000.00 - 369,600.00 -
0.5400 M3 Pasir Beton #REF! - #REF! -
0.8100 M3 Kerikil 450,000.00 - 364,500.00 -
0.0035 Kepala Tukang 70,000.00 245.00 - -
0.3500 Tukang 60,000.00 21,000.00 - -
2.0000 Pekerja 45,000.00 90,000.00 - -
0.0800 Mandor 0.00 0.00 - -
111,245.00 #REF! #REF!
23 Pekerjaan Beton Camp. 1 : 3 : 5 / M3
4.3600 Zak Semen PC 55,000.00 -- 239,800.00 --
0.5200 M3 Pasir Beton #REF! -- #REF! --
0.8700 M3 Kerikil 450,000.00 -- 391,500.00 --
0.0250 Kepala Tukang 70,000.00 1,750.00 -- --
0.2500 Tukang 60,000.00 15,000.00 -- --
1.6500 Pekerja 45,000.00 74,250.00 -- --
0.0800 Mandor - 0.00 -- --
91,000.00 #REF! #REF!
24 Pembesian 1 kg dengan besi polos atau besi ulir
1.0500 Kg Besi Beton 26,000.00 -- 27,300.00 --
0.0150 Kg Kawat Beton 1,700.00 -- 25.50 --
0.0007 Kepala Tukang 70,000.00 49.00 -- --
0.0070 Tukang 60,000.00 420.00 -- --
0.0070 Pekerja 45,000.00 315.00 -- --
0.0004 Mandor - 0.00 -- --
784.00 27,325.50 28,109.50
25 Pasang Beskisting Sloof / M2
0.0450 M3 Papan Bekisting 0.00 -- 0.00 --
0.3000 Kg Paku 25,000.00 -- 7,500.00 --
0.1000 Ltr Minyak Bekisting 0.00 -- 0.00 --
0.0260 Kepala Tukang 70,000.00 1,820.00 -- --
0.2600 Tukang 60,000.00 15,600.00 -- --
0.5200 Pekerja 45,000.00 23,400.00 -- --
0.0260 Mandor - 0.00 -- --
40,820.00 7,500.00 48,320.00
26 Pasang Beskisting Kolom / M2
0.0400 M3 Papan Bekisting 0.00 -- 0.00 --
0.4000 Kg Paku 25,000.00 -- 10,000.00 --
0.2000 Ltr Minyak Bekisting 0.00 -- 0.00 --
0.0150 M3 Balok Bekisting 0.00 -- 0.00 --
2.0000 Btg Kayu Bulat ø 5/7 - 4 #REF! -- #REF! --
0.0330 Kepala Tukang 70,000.00 2,310.00 -- --
0.3300 Tukang 60,000.00 19,800.00 -- --
0.6600 Pekerja 45,000.00 29,700.00 -- --
0.0330 Mandor - 0.00 -- --
51,810.00 #REF! #REF!
HARGA SATUAN UPAH KERJA HARGA BAHAN JUMLAH
NO. URAIAN PEKERJAAN
( Rp) ( Rp) ( Rp) ( Rp)
1 2 3 4 5 6
27 Pasang Beskisting Ringbalk / M2
0.0400 M3 Papan Bekisting 0.00 - 0.00 -
0.4000 Kg Paku 25,000.00 - 10,000.00 -
0.2000 Ltr Minyak Bekisting - - 0.00 -
0.0180 M3 Balok Bekisting 0.00 - 0.00 -
2.0000 Btg Kayu Bulat ø 5/7 - 4 #REF! - #REF! -
0.0330 Kepala Tukang 70,000.00 2,310.00 - -
0.3300 Tukang 60,000.00 19,800.00 - -
0.3200 Pekerja 45,000.00 14,400.00 - -
0.0060 Mandor 0.00 0.00 - -
36,510.00 #REF! #REF!
28 Pasang Beskisting untuk lantai/ M2
0.0400 M3 Papan Bekisting 0.00 -- 0.00 --
0.4000 Kg Paku 25,000.00 -- 10,000.00 --
0.2000 Ltr Minyak Bekisting 0.00 -- 0.00 --
0.0150 M3 Balok Bekisting 0.00 -- 0.00 --
2.0000 Btg Kayu Bulat ø 5/7 - 4 #REF! #REF! -- --
0.0330 Kepala Tukang 70,000.00 2,310.00 -- --
0.3300 Tukang 60,000.00 19,800.00 -- --
0.6600 Pekerja 45,000.00 29,700.00 -- --
0.0330 Mandor 0.00
#REF! 10,000.00 #REF!
29 Beton Bertulang Sloof 15x15 / M3
1.0000 M3 Beton Camp. 1 : 2 : 3 111,245.00 #REF! #REF!
140.0000 Kg Tulangan Besi 109,760.00 3,825,570.00 3,935,330.00
13.3300 M2 Bekisting Sloof 544,130.60 99,975.00 644,105.60
765,135.60 #REF! #REF!
30 Beton Bertulang Kolom 15x15 / M3
1.0000 M3 Beton Camp. 1 : 2 : 3 111,245.00 #REF! #REF!
140.0000 Kg Tulangan Besi 109,760.00 3,825,570.00 3,935,330.00
13.3333 M2 Bekisting Kolom 690,798.27 #REF! #REF!
911,803.27 #REF! #REF!
31 Beton Bertulang Balok/ Ringbalk 15x15 / M3
1.0000 M3 Beton Camp. 1 : 2 : 3 111,245.00 #REF! #REF!
140.0000 Kg Tulangan Besi 109,760.00 3,825,570.00 3,935,330.00
13.3333 M2 Bekisting Balok 486,798.78 #REF! #REF!
707,803.78 #REF! #REF!
32 Beton Bertulang Lantai T = 10 cm / M3
1.0000 M3 Beton Camp. 1 : 2 : 3 111,245.00 #REF! #REF!
110.0000 Kg Tulangan Besi 86,240.00 2,595,922.50 2,682,162.50
10.0000 M2 Bekisting Plat Lantai #REF! 100,000.00 #REF!
#REF! #REF! #REF!
HARGA SATUAN
1 2 3 4
A BAHAN
B UPAH
Page 8
TIME SCHEDULE
PROGRAM : #REF!
KEGIATAN : #REF!
PEKERJAAN : PEMBANGUNAN RUMAH TYPE. A
LOKASI : BANJARMASIN
JADWAL PEKERJAAN
No. URAIAN PEKERJAAN BOBOT ( % ) BULAN KE- 1 BULAN KE- 2
I II III IV V VI VII VIII
E PEKERJAAN KUSEN / PINTU / JENDELA / VENTILASI 8.40 1.40 1.40 1.40 1.40 1.40 1.40
0.00
0.00
0.00
0