Bab 4
Bab 4
x̅ = 27.815 m
y̅ = 15.140 m
60
Tabel 4.1. Rekapitulasi perhitungan titik berat bangunan
Non-Void Void Combination
Tinggi
Elevation Luas Bangunan Luas Void Centroid X Centroid Y Centroid X Centroid Y Centroid X Centroid Y
No. Floor Lantai
m m2 m2 m m m m m m
m2
1 Basement 2 - 6.85 2323 - 3.30 28.65 19.72 - - 28.650 19.715
2 Basement 1 - 3.55 2323 62.27 3.55 28.65 19.72 30.98 16.77 27.093 18.762
3 Ground Floor + 0.00 2323 62.27 3.30 28.65 19.72 30.98 16.77 27.093 18.762
4 Mezzanine + 3.30 910 - 3.25 - - - - 23.970 28.090
5 2nd floor + 6.55 1836 62.27 3.30 26.49 22.30 30.98 16.77 24.609 21.021
6 3rd floor + 9.85 1836 62.27 3.30 26.49 22.30 30.98 16.77 24.609 21.021
7 4th floor + 13.15 1836 62.27 4.50 26.49 22.30 30.98 16.77 24.609 21.021
8 5th floor + 17.65 1836 62.27 3.50 26.49 22.30 30.98 16.77 24.609 21.021
9 6th floor + 21.15 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
10 7th floor + 24.65 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
11 8th floor + 28.15 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
12 9th floor + 31.65 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
13 10th floor + 35.15 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
14 11th floor + 38.65 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
15 12th floor + 42.15 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
16 13th floor + 45.65 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
17 14th floor + 49.15 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
18 15th floor + 52.65 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
19 16th floor + 56.15 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
20 17th floor + 59.65 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
21 18th floor + 63.15 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
22 19th floor + 66.65 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
23 20th floor + 70.15 950 62.27 5.00 32.25 15.29 30.98 16.77 28.362 13.314
24 21st floor + 75.15 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
25 22nd floor + 78.65 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
26 23rd floor + 82.15 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
27 24th floor + 85.65 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
28 25th floor + 89.15 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
29 26th floor + 92.65 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
30 27th floor + 96.15 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
31 28th floor + 99.65 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
32 29th floor + 103.15 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
33 30th floor + 106.65 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
34 31st floor + 110.15 950 62.27 3.50 32.25 15.29 30.98 16.77 28.362 13.314
35 Roof (MEP) + 113.65 875 62.27 4.50 32.40 14.98 30.98 16.77 28.187 12.870
36 Top Building + 118.15 162 - - 30.52 16.60 - - 30.525 16.602
𝜮=27.815 𝜮=15.140
Sumber: Perhitungan
61
62
Balok Joist
Penampang : W 200x100x5.5x8
Berat : 21.3 kg/m1
Kemudian berdasar beban mati yang bekerja pada setiap lantai struktur
bangunan yang disajikan pada tabel 4.5.
Tabel 4.5. Rekapitulasi Beban Mati Tambahan yang Bekerja pada Struktur
No. Floor Merata Terpusat
1 Basement 2 MD, KS, Plm, KP, DM -
2 Basement 1 MD, KS, Plm, KP, DM -
3 Ground Floor MD, Plf, KS, Pr, Plm, DM, SS -
4 Mezzanine MD, Plf, KS, Pr, Plm, DM, SS -
5 2nd floor MD, Plf, KS, Pr, Plm, DM, SS -
6 3rd floor MD, Plf, KS, Pr, Plm, DM, SS -
7 4th floor MD, Plf, KS, Pr, Plm, DM, SS -
8 5th floor MD, Plf, KS, Plm, DM, SS -
9 6th floor MD, Plf, KS, Plm, DM, SS -
10 7th floor MD, Plf, KS, Plm, DM, SS -
11 8th floor MD, Plf, KS, Plm, DM, SS -
12 9th floor MD, Plf, KS, Plm, DM, SS -
13 10th floor MD, Plf, KS, Plm, DM, SS -
14 11th floor MD, Plf, KS, Plm, DM, SS -
15 12th floor MD, Plf, KS, Plm, DM, SS -
16 13th floor MD, Plf, KS, Plm, DM, SS -
17 14th floor MD, Plf, KS, Plm, DM, SS -
18 15th floor MD, Plf, KS, Plm, DM, SS -
19 16th floor MD, Plf, KS, Plm, DM, SS -
20 17th floor MD, Plf, KS, Plm, DM, SS -
21 18th floor MD, Plf, KS, Plm, DM, SS -
22 19th floor MD, Plf, KS, Plm, DM, SS -
23 Refuge Area MD, Plf, KS, Plm, DM, SS -
24 21st floor MD, Plf, KS, Plm, DM, SS -
25 22nd floor MD, Plf, KS, Plm, DM, SS -
67
Lanjutan Tabel 4.5. Rekapitulasi Beban Mati Tambahan yang Bekerja pada Struktur
No. Floor Merata Terpusat
26 23rd floor MD, Plf, KS, Plm, DM, SS -
27 24th floor MD, Plf, KS, Plm, DM, SS -
28 25th floor MD, Plf, KS, Plm, DM, SS -
29 26th floor MD, Plf, KS, Plm, DM, SS -
30 27th floor MD, Plf, KS, Plm, DM, SS -
31 28th floor MD, Plf, KS, Plm, DM, SS -
32 29th floor MD, Plf, KS, Plm, DM, SS -
33 30th floor MD, Plf, KS, Plm, DM, SS -
34 31st floor MD, Plf, KS, Plm, DM, SS, Tm -
35 Roof (MEP) MD, Plm, DM, RT, Roof -
36 Top Building Rg G
Sumber: Perhitungan
Kemudian berdasar beban hidup yang bekerja diletakkan pada setiap lantai
struktur bangunan yang disajikan pada tabel 4.7.
Kelas situs pada gedung apartemen Puri Garden Jakarta Barat memiliki
kelas situs SE (tanah lunak) yang dapat dilihat pada tabel 4.9.
Kemudian koefisien situs dapat diperoleh seperti pada tabel 2.12 dan tabel
2.13 dengan metode interpolasi atau dapat menggunakan website resmi yaitu
www.puskim.pu.go.id pada aplikasi desain spektra gempa dengan memasukkan
titik koordinat objek penelitian pada peta dalam website tersebut dimana 𝐹𝑎= 1.33;
𝐹𝑉= 2.8; 𝑆𝑠=0.69; dan 𝑆1= 0.3 sehingga:
2 2
𝑆𝐷𝑆 = 𝑆 = 3 x 0.912
3 𝑀𝑆
𝑆𝐷𝑆 = 0.608
2 2
𝑆𝐷1 = 𝑆𝑀1 = x 0.841
3 3
𝑆𝐷1 = 0.561
Kemudian menentukan kategori desain seismik sesuai pada tabel 4.10 dan
tabel 4.11.
Tabel 4.10. Kategori desain seismik berdasar parameter respon percepatan pada periode
pendek
Nilai SDS I atau II atau III Kategori risiko IV
SDS < 0.167 A A
0.167 ≤ SDS < 0.33 B C
0.33 ≤ SDS < 0.50 C D
0.50 ≤ SDS D D
Sumber: SNI 1726-2012
72
Tabel 4.11. Kategori desain seismik berdasar parameter respon percepatan pada periode 1
detik
Nilai SD1 I atau II atau III Kategori risiko IV
SD1 < 0.167 A A
0.067 ≤ SD1 < 0.133 B C
0.133 ≤ SD1 < 0.200 C D
0.20 ≤ SD1 D D
Sumber: SNI 1726-2012
Pada penentuan kategori desain seismik dipilih resiko yang paling besar
antara SDS dengan SD1 sehingga dapat ditentukan bahwa gedung apartemen Puri
Garden memiliki kategori desain seismik D.
𝑆𝐷1 0.561
T0 = 0.2 = 0.2
𝑆𝐷𝑆 0.608
T0 = 0.185
𝑆𝐷1 0.561
TS = =
𝑆𝐷𝑆 0.608
TS = 0.923
Dimana:
𝑇
T0 > T maka, Sa = 𝑆𝐷𝑆 (0.4 + 0.6 )
𝑇0
T0 ≤T ≤ Ts maka, Sa = SDS
𝑆𝐷1
T > Ts maka, 𝑆 𝑎 =
𝑇
0.6
Percepatan respons spektra, Sa (g)
0.5
0.4
0.3
0.2
0.1
0
0 0.5 1 1.5 2 2.5 3 3.5 4
Periode, T (detik)
Contoh perhitungan
Diketahui:
Simpangan ijin lantai = 0.25% hsx
Ketinggian lantai atap = 125000 mm
Simpangan Max (lantai atap) = 305.62 mm
Tabel 4.18. Rekapitulasi Kontrol Simpangan Antar Lantai pada Struktur Eksisting.
Kombinasi Pembebanan 0.9D + 1.0E
Simpangan
Lateral Load hi Drift, δ Δ ijin, 2% Ratio Drift
Storey Output, Δ
VX Ton m
mm mm mm %
Roof -39.83 4500 232.68 7.94 90 0.177%
Roof (MEP) -41.81 3500 224.74 6.18 70 0.177%
Lt. 31 -41.09 3500 218.56 6.30 70 0.180%
Lt. 30 -40.37 3500 212.25 6.45 70 0.184%
Lt. 29 -39.65 3500 205.80 6.57 70 0.188%
Lt. 28 -38.93 3500 199.23 6.68 70 0.191%
Lt. 27 -38.21 3500 192.55 6.86 70 0.196%
Lt. 26 -37.49 3500 185.69 6.99 70 0.200%
Lt. 25 -36.77 3500 178.70 7.17 70 0.205%
Lt. 24 -36.05 3500 171.53 7.31 70 0.209%
Lt. 23 -35.33 3500 164.22 7.46 70 0.213%
Lt. 22 -34.61 3500 156.75 7.64 70 0.218%
Lt 21 -33.89 5000 149.11 11.10 100 0.222%
Refuge Area -33.17 3500 138.01 7.87 70 0.225%
Lt. 19 -32.45 3500 130.14 7.99 70 0.228%
Lt. 18 -31.73 3500 122.14 8.09 70 0.231%
Lt. 17 -31.01 3500 114.06 8.16 70 0.233%
Lt. 16 -30.20 3500 105.90 8.20 70 0.234%
Lt. 15 -29.39 3500 97.70 8.19 70 0.234%
Lt. 14 -28.58 3500 89.50 8.19 70 0.234%
Lt. 13 -27.77 3500 81.32 8.18 70 0.234%
Lt. 12 -26.96 3500 73.14 8.10 70 0.231%
Lt. 11 -26.15 3500 65.04 8.00 70 0.228%
Lt. 10 -25.34 3500 57.05 7.79 70 0.222%
Lt. 9 -24.53 3500 49.26 7.57 70 0.216%
Lt. 8 -23.72 3500 41.69 7.18 70 0.205%
Lt. 7 -22.91 3500 34.51 6.69 70 0.191%
Lt. 6 -22.10 3500 27.82 6.12 70 0.175%
Lt. 5 -21.29 4500 21.69 6.97 90 0.155%
Lt. 4 -20.36 3300 14.72 4.37 66 0.132%
Lt. 3 -19.43 3300 10.35 3.60 66 0.109%
Lt. 2 -18.50 3250 6.75 2.78 65 0.086%
Mezzanine -17.57 3300 3.96 2.03 66 0.061%
Ground Floor -16.64 3550 1.94 1.38 71 0.039%
Basement 1 -15.71 3300 0.56 0.56 66 0.017%
Basement 2 -14.78 0 0.00 0 0 0.000%
Sumber: Perhitungan
86
Lanjutan Tabel 4.18. Rekapitulasi Kontrol Simpangan Antar Lantai pada Struktur
Eksisting.
Kombinasi Pembebanan 0.9D + 1.0E
Simpangan
Lateral Load hi Drift, δ Δ ijin, 2% Ratio Drift
Storey Output, Δ
VY Ton m
mm mm mm %
Roof 38.26 4500 287.49 7.18 90 0.159%
Roof (MEP) 133.46 3500 280.31 6.04 70 0.173%
Lt. 31 93.44 3500 274.27 6.51 70 0.186%
Lt. 30 75.45 3500 267.75 6.87 70 0.196%
Lt. 29 58.03 3500 260.89 7.30 70 0.208%
Lt. 28 42.32 3500 253.59 7.69 70 0.220%
Lt. 27 28.85 3500 245.90 8.15 70 0.233%
Lt. 26 17.97 3500 237.75 8.46 70 0.242%
Lt. 25 9.66 3500 229.29 8.71 70 0.249%
Lt. 24 3.78 3500 220.58 9.05 70 0.258%
Lt. 23 0.00 3500 211.53 9.36 70 0.267%
Lt. 22 -1.94 3500 202.17 9.67 70 0.276%
Lt 21 -2.24 5000 192.50 14.10 100 0.282%
Refuge Area -0.79 3500 178.41 9.98 70 0.285%
Lt. 19 1.93 3500 168.42 10.18 70 0.291%
Lt. 18 5.89 3500 158.24 10.31 70 0.294%
Lt. 17 13.98 3500 147.93 10.49 70 0.300%
Lt. 16 19.80 3500 137.45 10.64 70 0.304%
Lt. 15 23.06 3500 126.80 10.71 70 0.306%
Lt. 14 26.93 3500 116.09 10.74 70 0.307%
Lt. 13 31.18 3500 105.36 10.76 70 0.308%
Lt. 12 35.38 3500 94.59 10.62 70 0.304%
Lt. 11 39.00 3500 83.97 10.51 70 0.300%
Lt. 10 41.71 3500 73.46 10.16 70 0.290%
Lt. 9 43.39 3500 63.30 9.77 70 0.279%
Lt. 8 44.15 3500 53.53 9.28 70 0.265%
Lt. 7 44.12 3500 44.25 8.53 70 0.244%
Lt. 6 43.32 3500 35.73 7.75 70 0.222%
Lt. 5 74.19 4500 27.97 8.99 90 0.200%
Lt. 4 78.36 3300 18.98 5.79 66 0.176%
Lt. 3 66.85 3300 13.18 4.77 66 0.145%
Lt. 2 55.24 3250 8.42 3.69 65 0.113%
Mezzanine 23.31 3300 4.73 2.49 66 0.075%
Ground Floor 27.13 3550 2.24 1.59 71 0.045%
Basement 1 11.76 3300 0.66 0.66 66 0.020%
Basement 2 5.47 0.00 0.00 0.00 0 0.000%
Sumber: Perhitungan
87
Lanjutan Tabel 4.18. Rekapitulasi Kontrol Simpangan Antar Lantai pada Struktur
Eksisting.
Kombinasi Pembebanan 1.2D + 1.0 E + L
Simpangan
Lateral Load hi Drift, δ Δ ijin, 2% Ratio Drift
Storey Output, Δ
VX Ton m
mm mm mm %
Roof 41.98 4500 256.76 8.77 90 0.195%
Roof (MEP) 41.81 3500 247.99 6.82 70 0.195%
Lt. 31 41.09 3500 241.17 6.96 70 0.199%
Lt. 30 40.37 3500 234.21 7.12 70 0.203%
Lt. 29 39.65 3500 227.10 7.25 70 0.207%
Lt. 28 38.93 3500 219.85 7.38 70 0.211%
Lt. 27 38.21 3500 212.47 7.57 70 0.216%
Lt. 26 37.49 3500 204.90 7.71 70 0.220%
Lt. 25 36.77 3500 197.19 7.91 70 0.226%
Lt. 24 36.05 3500 189.28 8.07 70 0.231%
Lt. 23 35.33 3500 181.21 8.24 70 0.235%
Lt. 22 34.61 3500 172.97 8.43 70 0.241%
Lt 21 33.89 5000 164.54 12.25 100 0.245%
Refuge Area 33.17 3500 152.29 8.69 70 0.248%
Lt. 19 32.45 3500 143.60 8.82 70 0.252%
Lt. 18 31.73 3500 134.78 8.92 70 0.255%
Lt. 17 31.01 3500 125.86 9.00 70 0.257%
Lt. 16 30.20 3500 116.86 9.05 70 0.259%
Lt. 15 29.39 3500 107.81 9.04 70 0.258%
Lt. 14 28.58 3500 98.76 9.03 70 0.258%
Lt. 13 27.77 3500 89.73 9.02 70 0.258%
Lt. 12 26.96 3500 80.71 8.94 70 0.255%
Lt. 11 26.15 3500 71.77 8.82 70 0.252%
Lt. 10 25.34 3500 62.95 8.59 70 0.246%
Lt. 9 24.53 3500 54.36 8.36 70 0.239%
Lt. 8 23.72 3500 46.00 7.92 70 0.226%
Lt. 7 22.91 3500 38.08 7.39 70 0.211%
Lt. 6 22.10 3500 30.69 6.76 70 0.193%
Lt. 5 21.29 4500 23.93 7.69 90 0.171%
Lt. 4 20.36 3300 16.24 4.82 66 0.146%
Lt. 3 19.43 3300 11.42 3.97 66 0.120%
Lt. 2 18.50 3250 7.44 3.07 65 0.094%
Mezzanine 17.57 3300 4.37 2.23 66 0.068%
Ground Floor 16.64 3550 2.14 1.52 71 0.043%
Basement 1 15.71 3300 0.62 0.62 66 0.019%
Basement 2 14.78 0 0.00 0 0 -
Sumber: Perhitungan
89
Lanjutan Tabel 4.18. Rekapitulasi Kontrol Simpangan Antar Lantai pada Struktur
Eksisting.
Kombinasi Pembebanan 1.2D + 1.0 E + L
Lateral Simpangan
hi Drift, δ Δ ijin, 2% Ratio Drift
Storey Load Output, Δ
m
VY Ton mm mm mm %
Roof 38.41 4500 305.62 10.43 90 0.232%
Roof (MEP) 51.48 3500 295.18 8.12 70 0.232%
Lt. 31 50.66 3500 287.06 8.28 70 0.237%
Lt. 30 49.84 3500 278.78 8.47 70 0.242%
Lt. 29 49.02 3500 270.31 8.63 70 0.247%
Lt. 28 48.20 3500 261.68 8.78 70 0.251%
Lt. 27 47.38 3500 252.91 9.01 70 0.257%
Lt. 26 46.56 3500 243.90 9.18 70 0.262%
Lt. 25 45.74 3500 234.72 9.42 70 0.269%
Lt. 24 44.92 3500 225.29 9.60 70 0.274%
Lt. 23 44.10 3500 215.69 9.80 70 0.280%
Lt. 22 43.28 3500 205.89 10.04 70 0.287%
Lt 21 42.46 5000 195.85 14.58 100 0.292%
Refuge Area 41.64 3500 181.27 10.34 70 0.295%
Lt. 19 40.82 3500 170.93 10.50 70 0.300%
Lt. 18 40.00 3500 160.43 10.62 70 0.304%
Lt. 17 39.18 3500 149.81 10.71 70 0.306%
Lt. 16 37.93 3500 139.10 10.77 70 0.308%
Lt. 15 36.68 3500 128.32 10.76 70 0.308%
Lt. 14 35.43 3500 117.56 10.75 70 0.307%
Lt. 13 34.18 3500 106.81 10.74 70 0.307%
Lt. 12 32.93 3500 96.07 10.64 70 0.304%
Lt. 11 31.68 3500 85.43 10.50 70 0.300%
Lt. 10 30.43 3500 74.93 10.23 70 0.292%
Lt. 9 29.18 3500 64.70 9.95 70 0.284%
Lt. 8 27.93 3500 54.75 9.43 70 0.269%
Lt. 7 26.68 3500 45.32 8.79 70 0.251%
Lt. 6 25.43 3500 36.53 8.04 70 0.230%
Lt. 5 24.18 4500 28.49 9.16 90 0.204%
Lt. 4 22.93 3300 19.33 5.74 66 0.174%
Lt. 3 21.68 3300 13.59 4.73 66 0.143%
Lt. 2 20.43 3250 8.86 3.65 65 0.112%
Mezzanine 19.18 3300 5.21 2.66 66 0.081%
Ground Floor 17.93 3550 2.55 1.81 71 0.051%
Basement 1 16.68 3300 0.73 0.73 66 0.022%
Basement 2 15.43 0 0.00 0 0 -
Sumber: Perhitungan
90
Contoh Perhitungan:
𝑃𝑥.∆.𝐼𝑒
𝜃=
𝑉𝑥.ℎ𝑠𝑥.𝐶𝑑
Diketahui:
Proof = 407.90 Ton
Ie = 1.00
Vxroof = 39.83 Ton
hsx = 4500 mm
Cd = 5.5
∆ = 232.68mm – 231.26mm = 1.42 mm
0.5
𝜃max = ≤ 0.25 dimana 𝛽 = 1.0
𝛽.𝐶𝑑
0.5
𝜃max = = 0.091 ≤ 0.25
1.0×5.5
Maka,
𝜃 < 𝜃max = 0.0006 rad < 0.091 rad Pass!
Contoh perhitungan
Diketahui:
Simpangan ijin lantai = 0.25% hsx
Ketinggian lantai atap = 125000 mm
Simpangan Max (lantai atap) = 264.85 mm
= 0.0021188=> 0.212%
Simpangan Ijin = 0.25% x 125000 mm
= 312.50 mm
Tabel 4.22. Rekapitulasi Kontrol Simpangan Antar Lantai pada Permodelan SMBT1.
Kombinasi Pembebanan 0.9D + 1.0E
Lateral Simpangan Δ ijin, Ratio
hi Drift, δ
Storey Load Output, Δ 2% Drift
m
VX Ton mm mm mm %
Roof -26.05 4500 203.37 7.21 90 0.160%
Roof (MEP) -116.97 3500 196.16 5.57 70 0.159%
Lt. 31 -84.71 3500 190.59 5.55 70 0.158%
Lt. 30 -71.16 3500 185.05 5.62 70 0.160%
Lt. 29 -58.67 3500 179.43 5.76 70 0.165%
Lt. 28 -48.01 3500 173.67 5.84 70 0.167%
Lt. 27 -39.23 3500 167.83 6.03 70 0.172%
Lt. 26 -32.37 3500 161.80 6.16 70 0.176%
Lt. 25 -27.44 3500 155.64 6.26 70 0.179%
Lt. 24 BT -24.22 3500 149.39 6.43 70 0.184%
Lt. 23 BT -23.06 3500 142.95 5.39 70 0.154%
Lt. 22 -20.25 3500 137.56 6.67 70 0.191%
Lt 21 -19.85 5000 130.89 9.79 100 0.196%
Refuge Area -15.04 3500 121.10 7.00 70 0.200%
Lt. 19 -13.59 3500 114.10 7.14 70 0.204%
Lt. 18 -13.36 3500 106.96 7.27 70 0.208%
Lt. 17 -13.83 3500 99.69 7.42 70 0.212%
Lt. 16 -12.63 3500 92.27 7.46 70 0.213%
Lt. 15 -11.91 3500 84.81 7.47 70 0.213%
Lt. 14 -12.26 3500 77.34 7.45 70 0.213%
Lt. 13 -13.67 3500 69.90 7.31 70 0.209%
Lt. 12 -15.89 3500 62.59 7.14 70 0.204%
Lt. 11 -18.52 3500 55.44 6.92 70 0.198%
Lt. 10 -21.26 3500 48.53 6.71 70 0.192%
Lt. 9 -23.79 3500 41.82 6.43 70 0.184%
Lt. 8 -25.84 3500 35.39 6.09 70 0.174%
Lt. 7 -27.15 3500 29.29 5.68 70 0.162%
Lt. 6 -27.51 3500 23.61 5.20 70 0.149%
Lt. 5 -48.10 4500 18.41 5.92 90 0.132%
Lt. 4 -51.67 3300 12.49 3.71 66 0.112%
Lt. 3 -48.13 3300 8.78 3.06 66 0.093%
Lt. 2 -43.91 3250 5.73 2.36 65 0.073%
Mezzanine -21.25 3300 3.36 1.72 66 0.052%
Ground Floor -29.10 3550 1.65 1.17 71 0.033%
Basement 1 -15.20 3300 0.47 0.47 66 0.014%
Basement 2 -5.03 0 0.00 0 0 -
Sumber: Perhitungan
108
Lanjutan Tabel 4.22. Rekapitulasi Kontrol Simpangan Antar Lantai pada Permodelan SMBT1.
Kombinasi Pembebanan 1.2D + 1.0 E + L
Simpangan
Lateral Load hi Drift, δ Δ ijin, 2% Ratio Drift
Storey Output, Δ
VX Ton m
mm mm mm %
Roof -23.91 4500 221.43 7.85 90 0.174%
Roof (MEP) -140.95 3500 213.58 6.06 70 0.173%
Lt. 31 -225.72 3500 207.52 6.04 70 0.173%
Lt. 30 -296.94 3500 201.48 6.11 70 0.175%
Lt. 29 -355.67 3500 195.37 6.27 70 0.179%
Lt. 28 -403.74 3500 189.09 6.36 70 0.182%
Lt. 27 -443.02 3500 182.73 6.56 70 0.188%
Lt. 26 -475.44 3500 176.17 6.70 70 0.192%
Lt. 25 -502.94 3500 169.47 6.92 70 0.198%
Lt. 24 BT -527.20 3500 162.55 6.90 70 0.197%
Lanjutan Tabel 4.22. Rekapitulasi Kontrol Simpangan Antar Lantai pada Permodelan SMBT1.
Kombinasi Pembebanan 1.2D + 1.0 E + L
Lateral Simpangan Drift, Δ ijin, Ratio
hi Output, Δ δ 2%
Storey Load Drift
m
VX Ton mm mm mm %
Roof -23.91 4500 240.43 7.68 90 0.171%
Roof (MEP) -140.95 3500 232.75 7.80 70 0.223%
Lt. 31 -225.72 3500 224.95 6.49 70 0.185%
Lt. 30 -296.94 3500 218.46 9.52 70 0.272%
Lt. 29 -355.67 3500 208.94 9.52 70 0.272%
Lt. 28 -403.74 3500 199.42 9.50 70 0.272%
Lt. 27 -443.02 3500 189.91 9.45 70 0.270%
Lt. 26 -475.44 3500 180.46 9.36 70 0.267%
Lt. 25 -502.94 3500 171.10 9.20 70 0.263%
Lt. 24 -527.20 3500 161.90 9.12 70 0.260%
Lt. 23 -550.31 3500 152.78 9.07 70 0.259%
Lt. 22 -570.60 3500 143.71 9.02 70 0.258%
Lt 21 -590.49 5000 134.69 8.65 100 0.173%
Refuge Area -605.57 3500 126.03 9.67 70 0.276%
Lt. 19 -619.20 3500 116.37 4.49 70 0.128%
Lt. 18 -632.59 3500 111.88 6.06 70 0.173%
Lt. 17 -646.44 3500 105.82 4.75 70 0.136%
Lt. 16 -659.10 3500 101.07 8.58 70 0.245%
Lt. 15 -671.03 3500 92.48 8.38 70 0.240%
Lt. 14 -683.31 3500 84.10 8.16 70 0.233%
Lt. 13 -696.99 3500 75.93 7.93 70 0.226%
Lt. 12 -712.90 3500 68.01 7.67 70 0.219%
Lt. 11 -731.44 3500 60.34 7.39 70 0.211%
Lt. 10 -752.71 3500 52.95 7.09 70 0.203%
Lt. 9 -776.52 3500 45.85 6.77 70 0.193%
Lt. 8 -802.37 3500 39.09 6.40 70 0.183%
Lt. 7 -829.54 3500 32.68 6.00 70 0.172%
Lt. 6 -857.06 3500 26.68 0.22 70 0.006%
Lt. 5 -905.18 4500 26.47 7.88 90 0.175%
Lt. 4 -956.87 3300 18.59 5.10 66 0.155%
Lt. 3 -1005.01 3300 13.49 4.45 66 0.135%
Lt. 2 -1048.93 3250 9.04 3.73 65 0.115%
Mezzanine -1070.57 3300 5.31 2.84 66 0.086%
Ground Floor -1100.73 3550 2.47 1.81 71 0.051%
Basement 1 -1114.50 3300 0.66 0.66 66 0.020%
Basement 2 -1062.87 0 0.00 0 0 -
Sumber: Perhitungan
111
Lanjutan Tabel 4.22. Rekapitulasi Kontrol Simpangan Antar Lantai pada Permodelan SMBT1.
Kombinasi Pembebanan 1.2D + 1.0 E + L
Simpangan
Lateral Load hi Drift, δ Δ ijin, 2% Ratio Drift
Storey Output, Δ
VY Ton m
mm mm mm %
Roof -42.94 4500 264.85 6.64 90 0.147%
Roof (MEP) -192.39 3500 258.21 4.00 70 0.114%
Lt. 31 -297.88 3500 254.21 5.00 70 0.143%
Lt. 30 -383.58 3500 249.21 5.24 70 0.150%
Lt. 29 -451.17 3500 243.96 5.49 70 0.157%
Lt. 28 -503.00 3500 238.47 5.73 70 0.164%
Lt. 27 -541.19 3500 232.74 5.95 70 0.170%
Lt. 26 -567.73 3500 226.79 6.12 70 0.175%
Lt. 25 -584.67 3500 220.67 6.20 70 0.177%
Lt. 24 -594.07 3500 214.47 6.14 70 0.175%
Lt. 23 -597.95 3500 208.34 6.88 70 0.197%
Lt. 22 -597.44 3500 201.45 7.48 70 0.214%
Lt 21 -594.26 5000 193.97 8.51 100 0.170%
Refuge Area -586.08 3500 185.46 9.54 70 0.272%
Lt. 19 -580.85 3500 175.93 10.96 70 0.313%
Lt. 18 -579.57 3500 164.96 9.51 70 0.272%
Lt. 17 -586.97 3500 155.45 10.01 70 0.286%
Lt. 16 -601.05 3500 145.45 10.37 70 0.296%
Lt. 15 -619.34 3500 135.07 10.65 70 0.304%
Lt. 14 -642.83 3500 124.43 10.82 70 0.309%
Lt. 13 -671.93 3500 113.60 10.91 70 0.312%
Lt. 12 -706.53 3500 102.69 10.91 70 0.312%
Lt. 11 -746.07 3500 91.78 10.80 70 0.309%
Lt. 10 -789.68 3500 80.98 10.60 70 0.303%
Lt. 9 -836.17 3500 70.38 10.28 70 0.294%
Lt. 8 -884.12 3500 60.10 9.83 70 0.281%
Lt. 7 -932.04 3500 50.27 9.24 70 0.264%
Lt. 6 -978.45 3500 41.03 5.16 70 0.147%
Lt. 5 -1058.28 4500 35.87 10.46 90 0.232%
Lt. 4 -1138.61 3300 25.42 6.68 66 0.202%
Lt. 3 -1207.40 3300 18.74 5.87 66 0.178%
Lt. 2 -1266.05 3250 12.87 5.70 65 0.175%
Mezzanine -1292.01 3300 7.17 2.95 66 0.090%
Ground Floor -1328.56 3550 4.21 3.05 71 0.086%
Basement 1 -1343.64 3300 1.17 1.17 66 0.035%
Basement 2 -1343.21 0 0.00 0 0 -
Sumber: Perhitungan
112
Contoh Perhitungan:
𝑃𝑥.∆.𝐼𝑒
𝜃=
𝑉𝑥.ℎ𝑠𝑥.𝐶𝑑
Diketahui:
Proof = 461.20 Ton
Ie = 1.00
Vxroof = 50.08 Ton
hsx = 4500 mm
Cd = 5.5
∆ = 221.43mm – 213.58mm = 7.85 mm
𝜃 = 0.0029 rad
0.5
𝜃max = ≤ 0.25 dimana 𝛽 = 1.0
𝛽.𝐶𝑑
0.5
𝜃max = = 0.091 ≤ 0.25
1.0×5.5
Maka,
𝜃 < 𝜃max = 0.0029 rad < 0.091 rad Pass!
Contoh perhitungan
Diketahui:
Simpangan ijin lantai = 0.25% hsx
Ketinggian lantai atap = 125000 mm
Simpangan Max (lantai atap) = 244.17 mm
= 0.00195=> 0.195%
Simpangan Ijin = 0.25% x 125000 mm
= 312.50 mm
Tabel 4.26. Rekapitulasi Kontrol Simpangan Antar Lantai pada Permodelan SMBT2.
Kombinasi Pembebanan 0.9D + 1.0E
Simpangan
Lateral Load hi Drift, δ Δ ijin, 2% Ratio Drift
Story Output, Δ
VX Ton m
mm mm mm %
Roof -11.02 4500 191.54 6.29 90 0.140%
Roof (MEP) -75.22 3500 185.25 5.14 70 0.147%
Lt. 31 -63.23 3500 180.11 5.29 70 0.151%
Lt. 30 -62.53 3500 174.82 5.38 70 0.154%
Lt. 29 -61.35 3500 169.44 5.49 70 0.157%
Lt. 28 -60.09 3500 163.95 5.61 70 0.160%
Lt. 27 -58.74 3500 158.34 5.79 70 0.165%
Lt. 26 -57.32 3500 152.55 5.83 70 0.167%
Lt. 25 -55.83 3500 146.72 5.95 70 0.170%
Lt. 24 -54.22 3500 140.77 6.05 70 0.173%
Lt. 23 -52.64 3500 134.72 6.19 70 0.177%
Lt. 22 -50.95 3500 128.53 6.31 70 0.180%
Lt 21 -53.37 5000 122.22 9.19 100 0.184%
Refuge Area -50.46 3500 113.03 6.58 70 0.188%
Lt. 19 -44.77 3500 106.45 6.68 70 0.191%
Lt. 18 -42.15 3500 99.77 6.78 70 0.194%
Lt. 17 -41.44 3500 92.99 6.72 70 0.192%
Lt. 16 BT -40.57 3500 86.27 6.79 70 0.194%
Lt. 15 BT -40.15 3500 80.39 5.88 70 0.168%
Lt. 14 -35.63 3500 73.62 6.93 70 0.198%
Lt. 13 -33.62 3500 66.69 6.93 70 0.198%
Lt. 12 -31.55 3500 59.76 6.82 70 0.195%
Lt. 11 -29.36 3500 52.93 6.65 70 0.190%
Lt. 10 -26.95 3500 46.28 6.42 70 0.184%
Lt. 9 -24.31 3500 39.86 6.09 70 0.174%
Lt. 8 -21.44 3500 33.77 5.77 70 0.165%
Lt. 7 -18.42 3500 28.01 5.39 70 0.154%
Lt. 6 -15.39 3500 22.62 4.93 70 0.141%
Lt. 5 -19.73 4500 17.69 5.69 90 0.127%
Lt. 4 -15.02 3300 12.00 3.66 66 0.111%
Lt. 3 -10.77 3300 8.33 3.04 66 0.092%
Lt. 2 -7.82 3250 5.30 2.35 65 0.072%
Mezzanine -2.24 3300 2.95 1.62 66 0.049%
Ground Floor -2.13 3550 1.33 1.02 71 0.029%
Basement 1 -2.14 3300 0.31 0.31 66 0.009%
Basement 2 -1.60 0 0.00 0 0 -
Sumber: Perhitungan
127
Lanjutan Tabel 4.26. Rekapitulasi Kontrol Simpangan Antar Lantai pada Permodelan SMBT2.
Kombinasi Pembebanan 0.9D + 1.0E
Simpangan
Lateral Load hi Drift, δ Δ ijin, 2% Ratio Drift
Story Output, Δ
VY Ton m
mm mm mm %
Roof -17.39 4500 234.92 7.71 90 0.171%
Roof (MEP) -71.94 3500 227.20 6.30 70 0.180%
Lt. 31 -59.46 3500 220.90 6.49 70 0.185%
Lt. 30 -57.85 3500 214.41 6.60 70 0.189%
Lt. 29 -55.83 3500 207.81 6.73 70 0.192%
Lt. 28 -53.80 3500 201.08 6.88 70 0.197%
Lt. 27 -51.74 3500 194.20 7.10 70 0.203%
Lt. 26 -49.67 3500 187.10 7.15 70 0.204%
Lt. 25 -47.57 3500 179.95 7.30 70 0.208%
Lt. 24 -45.41 3500 172.65 7.42 70 0.212%
Lt. 23 -43.32 3500 165.23 7.59 70 0.217%
Lt. 22 -41.17 3500 157.64 7.74 70 0.221%
Lt 21 -42.32 5000 149.90 11.27 100 0.225%
Refuge Area -38.94 3500 138.63 8.07 70 0.231%
Lt. 19 -35.24 3500 130.56 8.19 70 0.234%
Lt. 18 -33.80 3500 122.36 8.31 70 0.237%
Lt. 17 -32.43 3500 114.05 8.45 70 0.242%
Lt. 16 BT -30.98 3500 105.60 8.32 70 0.238%
Lt. 15 BT -25.75 3500 97.28 6.02 70 0.213%
Lt. 14 -25.40 3500 91.25 8.54 70 0.244%
Lt. 13 -23.05 3500 82.72 8.65 70 0.247%
Lt. 12 -20.73 3500 74.07 8.46 70 0.242%
Lt. 11 -18.47 3500 65.61 8.24 70 0.236%
Lt. 10 -16.26 3500 57.37 7.96 70 0.227%
Lt. 9 -14.13 3500 49.41 7.55 70 0.216%
Lt. 8 -12.09 3500 41.86 7.15 70 0.204%
Lt. 7 -10.17 3500 34.72 6.68 70 0.191%
Lt. 6 -8.36 3500 28.03 6.11 70 0.175%
Lt. 5 -11.47 4500 21.93 7.06 90 0.157%
Lt. 4 -9.02 3300 14.87 4.54 66 0.138%
Lt. 3 -6.32 3300 10.33 3.77 66 0.114%
Lt. 2 -2.52 3250 6.56 2.91 65 0.090%
Mezzanine -1.90 3300 3.65 2.01 66 0.061%
Ground Floor -2.74 3550 1.65 1.26 71 0.035%
Basement 1 -2.14 3300 0.39 0.39 66 0.012%
Basement 2 -1.98 0 0.00 0 0 -
Sumber: Perhitungan
128
Lanjutan Tabel 4.26. Rekapitulasi Kontrol Simpangan Antar Lantai pada Permodelan SMBT2.
Kombinasi Pembebanan 1.2D + 1.0 E + L
Simpangan
Lateral Load hi Drift, δ Δ ijin, 2% Ratio Drift
Story Output, Δ
VX Ton m
mm mm mm %
Roof -8.86 4500 200.79 6.56 90 0.146%
Roof (MEP) -75.21 3500 194.23 5.36 70 0.153%
Lt. 31 -63.22 3500 188.86 5.52 70 0.158%
Lt. 30 -62.52 3500 183.35 5.61 70 0.160%
Lt. 29 -61.34 3500 177.73 5.73 70 0.164%
Lt. 28 -60.08 3500 172.01 5.85 70 0.167%
Lt. 27 -58.74 3500 166.15 6.04 70 0.173%
Lt. 26 -57.32 3500 160.11 6.08 70 0.174%
Lt. 25 -55.82 3500 154.03 6.21 70 0.177%
Lt. 24 -54.21 3500 147.83 6.31 70 0.180%
Lt. 23 -52.63 3500 141.51 6.46 70 0.184%
Lt. 22 -50.95 3500 135.06 6.58 70 0.188%
Lt 21 -53.37 5000 128.47 9.59 100 0.192%
Refuge Area -50.46 3500 118.89 6.86 70 0.196%
Lt. 19 -44.77 3500 112.02 6.97 70 0.199%
Lt. 18 -42.16 3500 105.06 7.07 70 0.202%
Lt. 17 -41.44 3500 97.99 7.19 70 0.205%
Lt. 16 BT -40.82 3500 90.80 7.08 70 0.202%
Lt. 15 BT -40.89 3500 83.72 6.10 70 0.174%
Lt. 14 -35.64 3500 77.62 7.26 70 0.207%
Lt. 13 -33.63 3500 70.35 7.35 70 0.210%
Lt. 12 -31.56 3500 63.00 7.19 70 0.205%
Lt. 11 -29.36 3500 55.81 7.01 70 0.200%
Lt. 10 -26.96 3500 48.80 6.77 70 0.193%
Lt. 9 -24.32 3500 42.03 6.42 70 0.183%
Lt. 8 -21.45 3500 35.61 6.08 70 0.174%
Lt. 7 -18.43 3500 29.53 5.68 70 0.162%
Lt. 6 -15.40 3500 23.85 5.19 70 0.148%
Lt. 5 -19.74 4500 18.65 6.00 90 0.133%
Lt. 4 -15.02 3300 12.65 3.86 66 0.117%
Lt. 3 -10.78 3300 8.79 3.20 66 0.097%
Lt. 2 -7.82 3250 5.58 2.48 65 0.076%
Mezzanine -1.61 3300 3.11 1.71 66 0.052%
Ground Floor -4.20 3550 1.40 1.07 71 0.030%
Basement 1 -2.72 3300 0.33 0.33 66 0.010%
Basement 2 -18.98 0 0.00 0 0 -
Sumber: Perhitungan
130
Lanjutan Tabel 4.26. Rekapitulasi Kontrol Simpangan Antar Lantai pada Permodelan SMBT2.
Kombinasi Pembebanan 1.2D + 1.0 E + L
Simpangan
Lateral Load hi Drift, δ Δ ijin, 2% Ratio Drift
Story Output, Δ
VY Ton m
mm mm mm %
Roof -17.25 4500 244.17 7.98 90 0.177%
Roof (MEP) -71.35 3500 236.19 6.52 70 0.186%
Lt. 31 -58.96 3500 229.67 6.71 70 0.192%
Lt. 30 -57.36 3500 222.96 6.82 70 0.195%
Lt. 29 -55.36 3500 216.14 6.96 70 0.199%
Lt. 28 -53.33 3500 209.17 7.12 70 0.203%
Lt. 27 -51.29 3500 202.06 7.35 70 0.210%
Lt. 26 -49.23 3500 194.71 7.40 70 0.211%
Lt. 25 -47.14 3500 187.32 7.55 70 0.216%
Lt. 24 -45.00 3500 179.77 7.67 70 0.219%
Lt. 23 -42.92 3500 172.09 7.85 70 0.224%
Lt. 22 -40.79 3500 164.24 8.00 70 0.229%
Lt 21 -41.92 5000 156.24 11.66 100 0.233%
Refuge Area -38.57 3500 144.58 8.35 70 0.238%
Lt. 19 -34.90 3500 136.23 8.47 70 0.242%
Lt. 18 -33.48 3500 127.76 8.60 70 0.246%
Lt. 17 -32.12 3500 119.16 8.74 70 0.250%
Lt. 16 BT -30.88 3500 110.41 8.61 70 0.246%
Lt. 15 BT -24.72 3500 101.81 7.42 70 0.212%
Lt. 14 -25.13 3500 94.39 8.83 70 0.252%
Lt. 13 -22.80 3500 85.56 8.94 70 0.256%
Lt. 12 -20.50 3500 76.61 8.75 70 0.250%
Lt. 11 -18.25 3500 67.87 8.53 70 0.244%
Lt. 10 -16.06 3500 59.34 8.23 70 0.235%
Lt. 9 -13.95 3500 51.11 7.81 70 0.223%
Lt. 8 -11.93 3500 43.30 7.39 70 0.211%
Lt. 7 -10.02 3500 35.91 6.91 70 0.197%
Lt. 6 -8.24 3500 29.00 6.32 70 0.180%
Lt. 5 -11.27 4500 22.68 7.30 90 0.162%
Lt. 4 -8.84 3300 15.38 4.70 66 0.142%
Lt. 3 -6.18 3300 10.68 3.90 66 0.118%
Lt. 2 -2.41 3250 6.79 3.01 65 0.093%
Mezzanine -0.84 3300 3.78 2.08 66 0.063%
Ground Floor -4.10 3550 1.70 1.30 71 0.037%
Basement 1 -1.70 3300 0.40 0.40 66 0.012%
Basement 2 -0.57 0 0.00 0 0 -
Sumber: Perhitungan
131
Contoh Perhitungan:
𝑃𝑥.∆.𝐼𝑒
𝜃=
𝑉𝑥.ℎ𝑠𝑥.𝐶𝑑
Diketahui:
Proof = 509.32 Ton
Ie = 1.00
Vxroof = 50.08 Ton
hsx = 4500 mm
Cd = 5.5
∆ = 200.79mm – 194.19mm = 6.59mm
0.5
𝜃max = ≤ 0.25 dimana 𝛽 = 1.0
𝛽.𝐶𝑑
0.5
𝜃max = = 0.091 ≤ 0.25
1.0×5.5
Maka,
𝜃 < 𝜃max = 0.0006 rad < 0.091 rad Pass!
137
138
Contoh perhitungan
Diketahui:
Simpangan ijin lantai = 0.25% hsx
Ketinggian lantai atap = 125000 mm
Simpangan Max (lantai atap) = 279.58 mm
= 0.0022366=> 0.224%
Simpangan Ijin = 0.25% x 125000 mm
= 312.50 mm
Tabel 4.30. Rekapitulasi Kontrol Simpangan Antar Lantai pada Permodelan SMBT3.
Kombinasi Pembebanan 0.9D + 1.0E
Simpangan
Lateral Load hi Drift, δ Δ ijin, 2% Ratio Drift
Storey Output, Δ
VX Ton m
mm mm mm %
Roof -11.30 4500 215.59 7.97 90 0.177%
Roof (MEP) -76.43 3500 207.62 6.20 70 0.177%
Lt. 31 -64.26 3500 201.43 6.32 70 0.180%
Lt. 30 -63.56 3500 195.11 6.47 70 0.185%
Lt. 29 -62.37 3500 188.64 6.58 70 0.188%
Lt. 28 -61.10 3500 182.07 6.70 70 0.191%
Lt. 27 -59.74 3500 175.37 6.87 70 0.196%
Lt. 26 -58.29 3500 168.50 6.99 70 0.200%
Lt. 25 -56.77 3500 161.50 7.21 70 0.206%
Lt. 24 -55.11 3500 154.30 7.33 70 0.209%
Lt. 23 -53.47 3500 146.97 7.48 70 0.214%
Lt. 22 -51.71 3500 139.49 7.66 70 0.219%
Lt 21 -54.08 5000 131.83 11.13 100 0.223%
Refuge Area -50.96 3500 120.71 7.89 70 0.225%
Lt. 19 -45.09 3500 112.82 7.91 70 0.226%
Lt. 18 -42.24 3500 104.91 7.98 70 0.228%
Lt. 17 -41.20 3500 96.93 7.98 70 0.228%
Lt. 16 -38.84 3500 88.95 7.90 70 0.226%
Lt. 15 -36.40 3500 81.05 7.77 70 0.222%
Lt. 14 -34.07 3500 73.28 7.67 70 0.219%
Lt. 13 -31.85 3500 65.61 7.48 70 0.214%
Lt. 12 -29.69 3500 58.13 7.31 70 0.209%
Lt. 11 -27.50 3500 50.82 6.99 70 0.200%
Lt. 10 -25.19 3500 43.82 6.53 70 0.187%
Lt. 9 -22.72 3500 37.29 6.10 70 0.174%
Lt. 8 BT -21.03 3500 31.20 5.36 70 0.153%
Lt. 7 BT -20.01 3500 25.83 3.49 70 0.100%
Lt. 6 -14.89 3500 22.34 4.61 70 0.132%
Lt. 5 -19.14 4500 17.73 5.67 90 0.126%
Lt. 4 -14.69 3300 12.06 3.58 66 0.108%
Lt. 3 -10.62 3300 8.49 2.98 66 0.090%
Lt. 2 -7.75 3250 5.50 2.30 65 0.071%
Mezzanine -1.48 3300 3.21 1.65 66 0.050%
Ground Floor -3.18 3550 1.56 1.11 71 0.031%
Basement 1 -3.81 3300 0.44 0.44 66 0.013%
Basement 2 -5.39 0 0.00 0 0 -
Sumber: Perhitungan
146
Lanjutan Tabel 4.30. Rekapitulasi Kontrol Simpangan Antar Lantai pada Permodelan SMBT3.
Kombinasi Pembebanan 0.9D + 1.0E
Simpangan
Lateral Load hi Drift, δ Δ ijin, 2% Ratio Drift
Storey Output, Δ
VY Ton m
mm mm mm %
Roof -17.32 4500 258.04 9.53 90 0.212%
Roof (MEP) -71.65 3500 248.51 7.42 70 0.212%
Lt. 31 -59.21 3500 241.09 7.56 70 0.216%
Lt. 30 -57.60 3500 233.53 7.74 70 0.221%
Lt. 29 -55.59 3500 225.79 7.87 70 0.225%
Lt. 28 -53.56 3500 217.92 8.02 70 0.229%
Lt. 27 -51.50 3500 209.90 8.23 70 0.235%
Lt. 26 -49.43 3500 201.68 8.37 70 0.239%
Lt. 25 -47.33 3500 193.30 8.63 70 0.246%
Lt. 24 -45.18 3500 184.68 8.77 70 0.251%
Lt. 23 -43.08 3500 175.91 8.95 70 0.256%
Lt. 22 -40.93 3500 166.96 9.17 70 0.262%
Lt 21 -42.06 5000 157.79 13.32 100 0.266%
Refuge Area -38.67 3500 144.48 9.45 70 0.270%
Lt. 19 -34.95 3500 135.03 9.47 70 0.271%
Lt. 18 -33.48 3500 125.56 9.55 70 0.273%
Lt. 17 -32.09 3500 116.02 9.55 70 0.273%
Lt. 16 -29.76 3500 106.47 9.46 70 0.270%
Lt. 15 -27.35 3500 97.01 9.30 70 0.266%
Lt. 14 -24.96 3500 87.71 9.18 70 0.262%
Lt. 13 -22.60 3500 78.53 8.96 70 0.256%
Lt. 12 -20.30 3500 69.57 8.75 70 0.250%
Lt. 11 -18.04 3500 60.82 8.37 70 0.239%
Lt. 10 -15.86 3500 52.45 7.82 70 0.223%
Lt. 9 -13.77 3500 44.64 7.30 70 0.208%
Lt. 8 BT -12.49 3500 37.34 6.42 70 0.183%
Lt. 7 BT -7.79 3500 30.92 4.18 70 0.119%
Lt. 6 -8.19 3500 26.74 5.52 70 0.158%
Lt. 5 -11.20 4500 21.22 6.79 90 0.151%
Lt. 4 -8.81 3300 14.44 4.28 66 0.130%
Lt. 3 -6.18 3300 10.16 3.57 66 0.108%
Lt. 2 -2.43 3250 6.59 2.75 65 0.085%
Mezzanine -1.92 3300 3.84 1.97 66 0.060%
Ground Floor -2.69 3550 1.86 1.33 71 0.037%
Basement 1 -2.09 3300 0.53 0.53 66 0.016%
Basement 2 -3.50 0 0.00 0 0 -
Sumber: Perhitungan
147
Lanjutan Tabel 4.30. Rekapitulasi Kontrol Simpangan Antar Lantai pada Permodelan SMBT3.
Kombinasi Pembebanan 1.2D + 1.0 E + L
Lateral Simpangan Drift, Δ ijin, Ratio
hi Output, Δ δ 2% Drift
Storey Load
m
VX Ton mm mm mm %
Roof -9.14 4500 235.24 8.69 90 0.193%
Roof (MEP) -76.42 3500 226.55 6.76 70 0.193%
Lt. 31 -64.25 3500 219.79 6.89 70 0.197%
Lt. 30 -63.55 3500 212.89 7.05 70 0.202%
Lt. 29 -62.36 3500 205.84 7.18 70 0.205%
Lt. 28 -61.09 3500 198.66 7.31 70 0.209%
Lt. 27 -59.73 3500 191.35 7.50 70 0.214%
Lt. 26 -58.29 3500 183.85 7.63 70 0.218%
Lt. 25 -56.76 3500 176.22 7.86 70 0.225%
Lt. 24 -55.11 3500 168.36 7.99 70 0.228%
Lt. 23 -53.47 3500 160.36 8.16 70 0.233%
Lt. 22 -51.70 3500 152.21 8.36 70 0.239%
Lt 21 -54.08 5000 143.85 12.14 100 0.243%
Refuge Area -50.96 3500 131.71 8.61 70 0.246%
Lt. 19 -45.09 3500 123.10 8.63 70 0.247%
Lt. 18 -42.25 3500 114.47 8.70 70 0.249%
Lt. 17 -41.20 3500 105.76 8.70 70 0.249%
Lt. 16 -38.84 3500 97.06 8.62 70 0.246%
Lt. 15 -36.40 3500 88.44 8.48 70 0.242%
Lt. 14 -34.08 3500 79.96 8.37 70 0.239%
Lt. 13 -31.86 3500 71.59 8.17 70 0.233%
Lt. 12 -29.70 3500 63.42 7.97 70 0.228%
Lt. 11 -27.50 3500 55.45 7.63 70 0.218%
Lt. 10 -25.19 3500 47.82 7.13 70 0.204%
Lt. 9 -22.73 3500 40.69 6.65 70 0.190%
Lt. 8 BT -21.27 3500 34.04 5.85 70 0.167%
Lt. 7 BT -20.76 3500 28.19 3.81 70 0.109%
Lt. 6 -18.90 3500 24.38 5.03 70 0.144%
Lt. 5 -15.15 4500 19.35 6.19 90 0.137%
Lt. 4 -13.69 3300 13.16 3.90 66 0.118%
Lt. 3 -10.63 3300 9.26 3.25 66 0.099%
Lt. 2 -4.75 3250 6.00 2.51 65 0.077%
Mezzanine -5.85 3300 3.50 1.80 66 0.055%
Ground Floor -4.25 3550 1.70 1.21 71 0.034%
Basement 1 -2.39 3300 0.49 0.49 66 0.015%
Basement 2 -1.79 0 0.00 0 0 -
Sumber: Perhitungan
149
Lanjutan Tabel 4.30. Rekapitulasi Kontrol Simpangan Antar Lantai pada Permodelan SMBT3.
Kombinasi Pembebanan 1.2D + 1.0 E + L
Simpangan
Lateral Load hi Drift, δ Δ ijin, 2% Ratio Drift
Storey Output, Δ
VY Ton m
mm mm mm %
Roof -17.18 4500 278.58 10.29 90 0.229%
Roof (MEP) -71.05 3500 268.29 8.01 70 0.229%
Lt. 31 -58.71 3500 260.28 8.16 70 0.233%
Lt. 30 -57.11 3500 252.12 8.35 70 0.239%
Lt. 29 -55.11 3500 243.76 8.50 70 0.243%
Lt. 28 -53.09 3500 235.26 8.65 70 0.247%
Lt. 27 -51.05 3500 226.61 8.88 70 0.254%
Lt. 26 -48.98 3500 217.73 9.04 70 0.258%
Lt. 25 -46.90 3500 208.69 9.31 70 0.266%
Lt. 24 -44.76 3500 199.38 9.47 70 0.271%
Lt. 23 -42.68 3500 189.91 9.66 70 0.276%
Lt. 22 -40.55 3500 180.25 9.90 70 0.283%
Lt 21 -41.66 5000 170.35 14.38 100 0.288%
Refuge Area -38.30 3500 155.98 10.20 70 0.291%
Lt. 19 -34.62 3500 145.78 10.22 70 0.292%
Lt. 18 -33.16 3500 135.56 10.31 70 0.294%
Lt. 17 -31.78 3500 125.25 10.31 70 0.294%
Lt. 16 -29.46 3500 114.94 10.21 70 0.292%
Lt. 15 -27.06 3500 104.73 10.04 70 0.287%
Lt. 14 -24.69 3500 94.69 9.91 70 0.283%
Lt. 13 -22.35 3500 84.78 9.67 70 0.276%
Lt. 12 -20.06 3500 75.11 9.44 70 0.270%
Lt. 11 -18.83 3500 65.67 9.04 70 0.258%
Lt. 10 -8.67 3500 56.63 8.44 70 0.241%
Lt. 9 -14.59 3500 48.19 7.88 70 0.225%
Lt. 8 BT -12.52 3500 40.31 6.93 70 0.198%
Lt. 7 BT -11.90 3500 33.38 4.51 70 0.129%
Lt. 6 -10.07 3500 28.87 5.96 70 0.170%
Lt. 5 -8.01 4500 22.91 7.33 90 0.163%
Lt. 4 -8.64 3300 15.58 4.62 66 0.140%
Lt. 3 -7.04 3300 10.96 3.85 66 0.117%
Lt. 2 -5.32 3250 7.11 2.97 65 0.091%
Mezzanine -1.86 3300 4.14 2.13 66 0.065%
Ground Floor -0.05 3550 2.01 1.44 71 0.040%
Basement 1 -2.65 3300 0.57 0.57 66 0.017%
Basement 2 -0.14 0 0.00 0 0 -
Sumber: Perhitungan
150
Contoh Perhitungan:
𝑃𝑥.∆.𝐼𝑒
𝜃=
𝑉𝑥.ℎ𝑠𝑥.𝐶𝑑
Diketahui:
Proof = 509.32 Ton
Ie = 1.00
Vxroof = 9.14 Ton
hsx = 4500 mm
Cd = 5.5
∆ = 233.24mm – 224.62mm = 8.62 mm
0.5
𝜃max = ≤ 0.25 dimana 𝛽 = 1.0
𝛽.𝐶𝑑
0.5
𝜃max = = 0.091 ≤ 0.25
1.0×5.5
Maka,
𝜃 < 𝜃max = 0.0194 rad < 0.091 rad Pass!
4.6. Rekapitulasi
Berdasar hasil penelitian diatas maka dapat diketahui bahwa pada
kombinasi pembebanan 1.2D+1.0E+L merupakan kondisi maksimum yang terjadi
pada simpangan permodelan struktur. Kemudian direkapitulasi hasil penelitian
pada struktur permodelan yang disajikan pada tabel dan grafik dibawah ini.
Gambar 4.26. Perbandingan Simpangan Titik Berat pada Pemodelan Struktur Sumbu X.
157
Gambar 4.27. Perbandingan Simpangan Titik Berat pada Pemodelan Struktur Sumbu Y.
158
Gambar 4.30. Perbandingan Simpangan Dinding Geser pada Pemodelan Struktur Sumbu X.
161
Gambar 4.31. Perbandingan Simpangan Dinding Geser pada Pemodelan Struktur Sumbu Y.
162
SMBT 1
Diketauhui:
Simpangan max : - Sumbu X = 256.76 mm (portal)
SMN - Sumbu Y = 305.62 mm (portal)
𝑆𝑖𝑚𝑝. 𝑆𝑀𝐵𝑇 1𝑥
Efisien sb. x = 100% − ( 𝑥 100%)
𝑆𝑖𝑚𝑝. 𝑆𝑀𝑁 𝑥
221.43 mm
= 100% − ( 𝑥 100%)
256.76 mm
= 100% - 86.24%
= 13.76%
𝑆𝑖𝑚𝑝. 𝑆𝑀𝐵𝑇 1𝑦
Efisien sb. y = 100% − ( 𝑥 100%)
𝑆𝑖𝑚𝑝. 𝑆𝑀𝑁 𝑦
264.85 mm
= 100% − ( 𝑥 100%)
305.62 mm
= 100% - 86.66%
= 13.34%
163
SMBT 2
Diketauhui:
Simpangan max : - Sumbu X = 256.76 mm (portal)
SMN - Sumbu Y = 305.62 mm (portal)
𝑆𝑖𝑚𝑝. 𝑆𝑀𝐵𝑇 2𝑥
Efisien sb. x = 100% − ( 𝑥 100%)
𝑆𝑖𝑚𝑝. 𝑆𝑀𝑁 𝑥
200.79 mm
= 100% − ( 256.76 mm 𝑥 100%)
= 100% - 78.59%
= 21.80%
𝑆𝑖𝑚𝑝. 𝑆𝑀𝐵𝑇 2𝑦
Efisien sb. y = 100% − ( 𝑥 100%)
𝑆𝑖𝑚𝑝. 𝑆𝑀𝑁 𝑦
244.17 mm
= 100% − ( 𝑥 100%)
305.62 mm
= 100% - 79.90%
= 20.10%
SMBT 3
Diketauhui:
Simpangan max : - Sumbu X = 256.76 mm (portal)
SMN - Sumbu Y = 305.62 mm (portal)
𝑆𝑖𝑚𝑝. 𝑆𝑀𝐵𝑇 2𝑥
Efisien sb. x = 100% − ( 𝑥 100%)
𝑆𝑖𝑚𝑝. 𝑆𝑀𝑁 𝑥
235.24 mm
= 100% − ( 𝑥 100%)
256.76 mm
= 100% - 90.84%
= 9.16%
𝑆𝑖𝑚𝑝. 𝑆𝑀𝐵𝑇 2𝑦
Efisien sb. y = 100% − ( 𝑥 100%)
𝑆𝑖𝑚𝑝. 𝑆𝑀𝑁 𝑦
278.58 mm
= 100% − ( 𝑥 100%)
305.62 mm
= 100% - 91.48%
= 8.52%
Pada simpangan antar lantai maksimum (drift storey max) penelitian, terjadi
pada Lt. 21 dengan simpangan maksimum Y= 14.43 mm. Hal ini dikarenakan
tinggi antar lantai pada refuge area dengan Lt. 21 sebesar 5000 mm sedangkan ada
ketinggian antar lantai dilantai dibawah dan diatasnya memiliki tinggi antar lantai
sama yaitu 3500 mm. Namun simpangan antar lantai masih dibawah simpangan ijin
(Δ ijin= 2%) sehinga masih masuk dalam simpangan ijin yang berlaku.
Pada ratio simpangan (drift ratio) penelitian, ketika disajikan dalam bentuk
kurva menghasilkan bentuk kurva seperti huruf C terbalik (lihat gambar 4.26 dan
2.27) yang dimana kurva tersebut menggambarkan bahwa pada struktur dari
basement 2 hingga Lt. 17 mengalami pembesaran nilai drift ratio sedangkan pada
Lt. 18 hingga Roof Top mengalami pengecilan nilai drift ratio. Namun pada Lt. 7
mengalami pengurangan nilai rasio simpangan signifikan sehingga pada kurva
terlihat seperti terdapat potongan. Hal ini dapat disimpulkan bahwa pada
penggunaan sistem belt truss pada struktur gedung akan terjadi perbedaan rasio
simpangan yang signifikan dibanding tingkatan lainnya karena adanya pengaku
lateral belt truss pada tingkat tersebut.
Perletakan sistem belt truss pada penelitian ini memiliki pengaruh yang baik
pada struktur yaitu pada permodelan SMBT 2 karena pada tingkatan tersebut drift
ratio maksimum terjadi. Dan fungsi belt truss sebagai pengaku lateral mampu
mereduksi nilai rasio simpangan maksimum yang terjadi pada sekitar ½H yang
menyebabkan menurunnya nilai rasio simpangan sehingga simpangan antar lantai
pun juga mengalami penurunan besaran simpangan.
Pada struktur gedung yang digunakan pada penelitian ini memiliki
simpangan terbesar terjadi pada sumbu Y yang dimana merupakan sumbu lemah
dari struktur gedung itu sendiri. Sehingga pada permodelan struktur yang digunakan
jumlah belt truss pada sumbu X lebih banyak daripada sumbu Y yang menghasilkan
penggunaan sistem belt truss pada sumbu X mampu mereduksi simpangan lebih
besar daripada sumbu Y pula dibanding dengan struktur eksisting. Berikut adalah
rekapitulasi simpangan maksimum, efisiensi sistem belt truss, dan drift ratio
maksimum pada setiap permodelan yang disajikan pada tabel 4.34 dan tabel 4.35.