Poso
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.)
I. PEKERJAAN PERSIAPAN 1.00 0.00 0.00 0.00
1. Pengukuran Kembali Ls 1.00 5,000,000.00 10.00 500,000.00
2. Pekerjaan PembongkLs 1.00 15,000,000.00 10.00 1,500,000.00
3. Keselamatan dan KesLs 1.00 10,000,000.00 10.00 1,000,000.00
II. PEKERJAAN TANAH 1.00 0.00 0.00 0.00
1. Galian Tanah M3 615.38 58,716.00 10.00 3,613,265.21
2. Urugan Pasir M3 85.47 216,086.00 10.00 1,846,887.04
III. PEKERJAAN PASANGAN, PELE 1.00 0.00 0.00 0.00
1. Pasangan Batu (1PC M3 338.46 833,128.00 10.00 28,198,050.29
2. Pelesteran 1,0 cm (1 M2 1,480.50 54,207.00 10.00 8,025,346.35
3. Pekerjaan Acian M2 1,480.50 32,207.00 10.00 4,768,246.35
4. Cor Lantai Beton (Ca M3 31.67 958,067.00 10.00 3,034,198.19
IV. PEKERJAAN PLAT DEUKER 1.00 0.00 0.00 0.00
1. Pasangan Batu (1PC M3 18.20 833,128.00 10.00 1,516,292.96
2. Pelesteran 1,0 cm (1 M2 32.20 54,207.00 10.00 174,546.54
3. Pekerjaan Acian M2 32.20 32,207.00 10.00 103,706.54
4. Cor Lantai Beton (Ca M3 0.89 958,067.00 10.00 85,267.96
5. Pekerjaan PembesianKg 3,822.04 14,071.00 10.00 5,377,992.48
6. Pekerjaan Bekisting M2 13.80 321,551.00 10.00 443,740.38
7. Pekerjaan Cor Plat B M3 3.45 1,038,745.00 10.00 358,367.03
V. PEKERJAAN PERAPIHAN 1.00 0.00 0.00 0.00
1. Pengangkutan sisa gaM3 615.38 25,733.00 10.00 1,583,557.35
2. Perataan dan Perapi Ls 1.00 10,000,000.00 10.00 1,000,000.00
Total (Rp.) Keterangan
0.00
5,500,000.00
16,500,000.00
11,000,000.00
0.00
39,745,917.29
20,315,757.46
0.00
310,178,553.17
88,278,809.85
52,450,709.85
33,376,180.08
0.00
16,679,222.56
1,920,011.94
1,140,771.94
937,947.59
59,157,917.32
4,881,144.18
3,942,037.28
0.00
17,419,130.89
11,000,000.00