RENCANA ANGGARAN BIAYA (RAB)

PROGRAM
PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS

KEGIATAN
PROGRAM PERGURUAN TINGGI UNIVERSITAS ANDALAS

PEKERJAAN
REHAB SALURAN BELAKANG REKTORAT UNIVERSITAS ANDALAS

LOKASI
KAMPUS UNIVERSITAS ANDALAS - LIMAU MANIS, PADANG

TAHUN ANGGARAN
2019
)

AS

ALAS

G
PENAWARAN HARGA
REKAPITULASI
RENCANA ANGGARAN BIAYA
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
KEGIATAN : PROGRAM PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : REHAB SALURAN BELAKANG REKTORAT UNIVERSITAS ANDALAS
LOKASI : KAMPUS UNIVERSITAS ANDALAS - LIMAU MANIS, PADANG
TAHUN ANGGARAN : 2019

JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.)

A PEKERJAAN PEMBERSIHAN SALURAN


I PEKERJAAN PERSIAPAN 3,525,500.00
II PEKERJAAN SALURAN 13,334,168.50

B PEKERJAAN SALURAN TYPE 1


I PEKERJAAN PERSIAPAN 7,953,336.00
II PEKERJAAN SALURAN 64,367,963.75

C PEKERJAAN SALURAN TYPE 2


I PEKERJAAN PERSIAPAN 10,466,026.50
II PEKERJAAN SALURAN 45,744,350.61

TOTAL A 145,391,345.35
PPN 10 % 14,539,134.54
TOTAL FISIK + PPN 10 % 159,930,479.89
DIBULATKAN 159,930,000.00
Terbilang : Seratus Lima Puluh Sembilan Juta Sembilan Ratus Tiga Puluh Ribu Rupiah

Padang, Juli 2019

Dibuat Oleh
Kontraktor Pelaksana
CV. KORREFT ANDALAS 1998

GUSMAR TANJUNG
Direktur
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
KEGIATAN : PROGRAM PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : REHAB SALURAN BELAKANG REKTORAT UNIVERSITAS ANDALAS
LOKASI : KAMPUS UNIVERSITAS ANDALAS - LIMAU MANIS, PADANG
TAHUN ANGGARA : 2019

SAT VOLUME HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN
(Rp.) (Rp.)

A PEKERJAAN PEMBERSIHAN SALURAN

I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Groundtank dan Pengurasan Ls 1.00 1,150,000.00 1,150,000.00
2 Pek. Bongkar Pasang Plat Deker M1 116.70 15,000.00 1,750,500.00
3 Sewa Steger Sheet 5.00 125,000.00 625,000.00
JUMLAH I 3,525,500.00

II PEKERJAAN SALURAN
1 Pek. Pembersihan Saluran M1 167.40 13,000.00 2,176,200.00
2 Pek. Penggantian Plat Deker yg Rusak uk. 40x60cm M3 0.67 1,904,098.79 1,279,554.38
3 Pek. Plester 1:4 M2 32.68 70,406.03 2,300,587.37
4 Pek. Acian M2 32.68 42,926.95 1,402,681.02
5 Pek. Penambalan Saluran yg Bocor M2 21.92 113,332.98 2,484,258.88
6 Pek. Pengecatan Tangga Arah Audit M2 5.88 32,463.75 190,886.85
7 Pek. Pemasangan Pipa Pembuangan Air AC Ls 1.00 1,500,000.00 1,500,000.00
8 Pek. Pembuangan Tanah dan Hasil Bongkaran Saluran Ls 1.00 2,000,000.00 2,000,000.00
JUMLAH II 13,334,168.50

B PEKERJAAN SALURAN TYPE 1

I PEKERJAAN PERSIAPAN
1 Pek. Bongkaran Gorong-gorong M1 75.05 75,000.00 5,628,750.00
2 Pek. Bongkaran Pasang Paving Blok M2 15.00 154,972.40 2,324,586.00

JUMLAH I 7,953,336.00

II PEKERJAAN SALURAN
1 Pek. Lantai Cor Kerja M3 2.25 709,585.38 1,597,631.49
2 Pek. Saluran Beton K 175 M3 29.73 1,904,098.79 56,612,665.09
3 Pek. Pembuatan Tutup Main Hole M3 0.29 1,904,098.79 548,380.45
4 Pek. Pemasangan Rumput M2 41.60 42,442.40 1,765,603.84
5 Pek. Plesteran Tutup Main Hole M2 2.54 70,406.03 178,479.28
6 Pek. Acian Tutup Main Hole M2 2.54 42,926.95 108,819.82
7 Pek. Cat Kanstin M2 63.34 32,463.75 2,056,383.78
8 Pek. Pembuangan Tanah dan Hasil Bongkaran Saluran Ls 1.00 1,500,000.00 1,500,000.00
JUMLAH II 64,367,963.75

C PEKERJAAN SALURAN TYPE 2

I PEKERJAAN PERSIAPAN
1 Pek. Bongkar Pasang Plat Deker M1 59.00 15,000.00 885,000.00
2 Pek. Bongkaran Saluran Lama M1 17.70 150,000.00 2,655,000.00
3 Pek. Bongkaran Pasang Paving M2 44.69 154,972.40 6,926,026.50
JUMLAH I 10,466,026.50
SAT VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.) (Rp.)
II PEKERJAAN SALURAN
1 Pek. Lantai Cor Kerja M3 1.77 709,585.38 1,255,966.13
2 Pek. Saluran Beton K 175 M3 21.24 1,904,098.79 40,443,058.20
3 Pek. Penggantian Plat Deker yg Rusak uk. 50x100cm M3 0.50 1,904,098.79 952,049.39
4 Cor Pinggir Saluran M3 2.95 709,585.38 2,093,276.88
5 Pek. Pembersihan Ls 1.00 1,000,000.00 1,000,000.00
JUMLAH II 45,744,350.61

Padang, Juli 2019


Dibuat Oleh
Kontraktor Pelaksana
CV. KORREFT ANDALAS 1998

GUSMAR TANJUNG
Direktur
PERHITUNGAN VOLUME ( ACTUAL CHECK )
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
KEGIATAN : PROGRAM PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : REHAB SALURAN BELAKANG REKTORAT UNIVERSITAS ANDALAS
LOKASI : KAMPUS UNIVERSITAS ANDALAS - LIMAU MANIS, PADANG
TAHUN ANGGARAN : 2019

No Uraian Pekerjaan Perhitungan Volume Satuan

A PEKERJAAN PEMBERSIHAN SALURAN

I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Groundtank dan Pengurasan 1.00 Ls
2 Pek. Bongkar Pasang Plat Deker 9.00 x 1.00 = 9.00 116.70 M1
10.60 x 1.00 = 10.60
10.20 x 1.00 = 10.20
9.50 x 1.00 = 9.50
24.00 x 1.00 = 24.00
33.50 x 1.00 = 33.50
15.00 x 1.00 = 15.00
3.30 x 1.00 = 3.30
1.60 x 1.00 = 1.60
116.70

3 Sewa Steger 5.00 Sheet

II PEKERJAAN SALURAN
1 Pek. Pembersihan Saluran 9.00 x 1.00 = 9.00 167.40 M1
10.60 x 1.00 = 10.60
10.20 x 1.00 = 10.20
9.50 x 1.00 = 9.50
24.00 x 1.00 = 24.00
33.50 x 1.00 = 33.50
15.00 x 1.00 = 15.00
3.30 x 1.00 = 3.30
1.60 x 1.00 = 1.60
30.00 x 1.00 = 30.00
7.00 x 1.00 = 7.00
13.70 x 1.00 = 13.70
167.40
No Uraian Pekerjaan Perhitungan Volume Satuan

2 Pek. Penggantian Plat Deker yg Rusak uk. 40x60cm 0.60 x 0.40 x 0.10 x 10.00 = 0.24 0.67 M3
0.60 x 0.40 x 0.10 x 8.00 = 0.19
0.60 x 0.40 x 0.10 x 10.00 = 0.24
0.67

3 Pek. Plester 1:4 9.00 x 0.14 x 2.00 = 2.52 32.68 M2


10.60 x 0.14 x 2.00 = 2.97
10.20 x 0.14 x 2.00 = 2.86
9.50 x 0.14 x 2.00 = 2.66
24.00 x 0.14 x 2.00 = 6.72
33.50 x 0.14 x 2.00 = 9.38
15.00 x 0.14 x 2.00 = 4.20
3.30 x 0.14 x 2.00 = 0.92
1.60 x 0.14 x 2.00 = 0.45
32.68

4 Pek. Acian 32.68 M2


5 Pek. Penambalan Saluran yg Bocor 13.70 x 1.60 x 1.00 = 21.92 21.92 M2
6 Pek. Pengecatan Tangga Arah Audit 14.00 x 0.14 x 3.00 = 5.88 5.88 M2
7 Pek. Pemasangan Pipa Pembuangan Air AC 1.00 Ls
8 Pek. Pembuangan Tanah dan Hasil Bongkaran Saluran 1.00 Ls

B PEKERJAAN SALURAN TYPE 1

I PEKERJAAN PERSIAPAN
1 Pek. Bongkaran Gorong-gorong 34.65 x 1.00 = 34.65 75.05 M1
31.40 x 1.00 = 31.40
9.00 x 1.00 = 9.00
75.05

2 Pek. Bongkaran Pasang Paving Blok 7.50 x 1.00 x 2.00 = 15.00 15.00 M2
No Uraian Pekerjaan Perhitungan Volume Satuan

II PEKERJAAN SALURAN
1 Pek. Lantai Cor Kerja 34.65 x 0.60 x 0.05 x 1.00 = 1.04 2.25 M3
31.40 x 0.60 x 0.05 x 1.00 = 0.94
9.00 x 0.60 x 0.05 x 1.00 = 0.27

2 Pek. Saluran Beton K 175 34.65 x 0.20 x( 0.80 + 0.40 + 0.40 )= 11.09 29.73 M3
31.40 x 0.20 x( 0.80 + 0.40 + 0.40 )= 10.05
9.00 x 0.20 x( 0.80 + 0.40 + 0.40 )= 2.88
75.05 x 0.10 x 0.80 = 6.00
30.02
Besi dia 8
1.00 / 0.20 / 2.20 = 2.27 / 0.15 = 15.15

15.00 x 2.20 = 33.00 M1 0.395 = 13.04 Kg


Besi dia 10
2.20 / 0.15 = 14.67 x 2.27 = 33.33

33.33 M1 0.617 = 20.57


total barat Besi 13.04 + 20.57 = 33.60
Bekesting
0.60 x 2.27 x 2.00 = 2.72

Dikurang Tutup Mian Hole 0.10 x 0.40 x 0.60 x 12.00 = 0.29


29.73
3 Pek. Pembuatan Tutup Main Hole 0.10 x 0.40 x 0.60 x 12.00 = 0.29 0.29 M3
4 Pek. Pemasangan Rumput 0.80 x 26.00 x 2.00 = 41.60 41.60 M2
5 Pek. Plesteran Tutup Main Hole 0.67 x 0.15 x 10.00 = 1.01 2.54 M2
0.67 x 0.15 x 10.00 = 1.01
0.35 x 0.15 x 10.00 = 0.53
2.54

6 Pek. Acian Tutup Main Hole 2.54 M2


7 Pek. Cat Kanstin 28.20 x 0.80 x 2.00 = 45.12 63.34 M2
2.30 x 0.80 x 2.00 = 3.68
6.00 x 0.18 x 4.00 = 4.32
28.40 x 0.18 x 2.00 = 10.22
63.34
8 Pek. Pembuangan Tanah dan Hasil Bongkaran Saluran 1.00 Ls
No Uraian Pekerjaan Perhitungan Volume Satuan

C PEKERJAAN SALURAN TYPE 2

I PEKERJAAN PERSIAPAN
1 Pek. Bongkar Pasang Plat Deker 59.00 x 1.00 = 59.00 59.00 M1
2 Pek. Bongkaran Saluran Lama 59.00 x 0.20 + 0.30 x 0.60 x 2.00 = 17.70 17.70 M1
2.00
3 Pek. Bongkaran Pasang Paving 9.00 x 0.10 = 0.90 44.69 M2
3.40 x 1.84 / 2.00 x 14.00 = 43.79

II PEKERJAAN SALURAN
1 Pek. Lantai Cor Kerja 59.00 x 0.60 x 0.05 x 1.00 = 1.77 1.77 M3

2 Pek. Saluran Beton K 175 59.00 x 0.60 x 0.20 x 1.00 = 7.08 21.24 M3
59.00 x 0.60 x 0.20 x 2.00 = 14.16
21.24

3 Pek. Penggantian Plat Deker yg Rusak uk. 50x100cm 1.00 x 0.50 x 0.20 x 5.00 = 0.50 0.50 M3
4 Cor Pinggir Saluran 59.00 x 0.50 x 0.10 = 2.95 2.95 M3
5 Pek. Pembersihan 1.00 Ls

Padang, Juli 2019

Dibuat Oleh
Kontraktor Pelaksana
CV. KORREFT ANDALAS 1998

GUSMAR TANJUNG
Direktur
DAFTAR HARGA SATUAN PEKERJAAN BIDANG CIPTA KARYA

PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS


KEGIATAN : PROGRAM PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : REHAB SALURAN BELAKANG REKTORAT UNIVERSITAS ANDALAS
LOKASI : KAMPUS UNIVERSITAS ANDALAS - LIMAU MANIS, PADANG
TAHUN ANGGARAN : 2019

HARGA SATUAN
NO URAIAN PEKERJAAN SAT KET
PEKERJAAN (Rp)

A PEKERJAAN PEMBERSIHAN SALURAN

I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Groundtank dan Pengurasan Ls Rp 1,150,000.00
2 Pek. Bongkar Pasang Plat Deker M1 Rp 15,000.00

II PEKERJAAN SALURAN
1 Pek. Pembersihan Saluran M1 Rp 13,000.00
2 Pek. Penggantian Plat Deker yg Rusak uk. 40x60cm M3 Rp 1,904,098.79
3 Pek. Plester 1:4 M2 Rp 70,406.03
4 Pek. Acian M2 Rp 42,926.95
5 Pek. Penambalan Saluran yg Bocor M2 Rp 113,332.98
6 Pek. Pengecatan Tangga Arah Audit M2 Rp 32,463.75
8 Pek. Pembuangan Tanah dan Hasil Bongkaran Saluran Ls Rp 2,000,000.00

B PEKERJAAN SALURAN TYPE 1

I PEKERJAAN PERSIAPAN
1 Pek. Bongkaran Gorong-gorong M1 Rp 75,000.00
2 Pek. Bongkaran Pasang Paving Blok M2 Rp 154,972.40

II PEKERJAAN SALURAN
2 Pek. Saluran Beton K 175 M3 Rp 1,904,098.79
3 Pek. Pembuatan Tutup Main Hole M3 Rp 1,904,098.79
4 Pek. Pemasangan Rumput M2 Rp 42,442.40
5 Pek. Plesteran Tutup Main Hole M2 Rp 70,406.03
6 Pek. Acian Tutup Main Hole M2 Rp 42,926.95
7 Pek. Cat Kanstin M2 Rp 32,463.75

C PEKERJAAN SALURAN TYPE 2

I PEKERJAAN PERSIAPAN
1 Pek. Bongkar Pasang Plat Deker M1 Rp 15,000.00
2 Pek. Bongkaran Saluran Lama M1 Rp 150,000.00
3 Pek. Bongkaran Pasang Paving M2 Rp 154,972.40

II PEKERJAAN SALURAN
2 Pek. Saluran Beton K 175 M3 Rp 1,904,098.79
3 Pek. Penggantian Plat Deker yg Rusak uk. 50x100cm M3 Rp 1,904,098.79

Padang, Juli 2019


Dibuat Oleh
Kontraktor Pelaksana
CV. KORREFT ANDALAS 1998

GUSMAR TANJUNG
Direktur
ANALISA HARGA SATUAN PEKERJAAN BIDANG CIPTA KARYA
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
KEGIATAN : PROGRAM PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : REHAB SALURAN BELAKANG REKTORAT UNIVERSITAS ANDALAS
LOKASI : KAMPUS UNIVERSITAS ANDALAS - LIMAU MANIS, PADANG
TAHUN ANGGARAN : 2019

HARGA SATUAN PEKERJAAN PERSIAPAN


JENIS PEKERJAAN : A.2.2.1.2 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 384,927.07

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.2000 96,000.00 19,200.00
Tukang Kayu L.02 OH 0.4000 129,500.00 51,800.00
Kepala tukang L.03 OH 0.0200 148,400.00 2,968.00
Mandor L.04 OH 0.0200 148,400.00 2,968.00
JUMLAH TENAGA KERJA 76,936.00
B BAHAN
Dolken kayu φ 8-10 Cm Batang 1.2500 34,100.00 42,625.00
Semen Portland Kg 2.5000 1,202.00 3,005.00
Seng gelombang Lbr 1.2000 55,200.00 66,240.00
Pasir beton m3 0.0050 159,500.00 797.50
Koral beton m3 0.0090 145,000.00 1,305.00
Kayu 5/7 m3 0.0720 1,962,100.00 141,271.20
Paku biasa 2" - 5" Kg 0.0600 16,900.00 1,014.00
Meni besi Liter 0.4500 37,200.00 16,740.00
JUMLAH HARGA BAHAN 272,997.70
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 349,933.70
E Overhead & profit 10% x Jumlah 34,993.37
F Harga Satuan Pekerjaan (D+E) 384,927.07

JENIS PEKERJAAN : A.2.2.1.5 Pembuatan 1 m2 kantor sementara Lantai Plesteran


SATUAN : M2
HARGA SATUAN PEKERJAAN : #REF!

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 2.0000 96,000.00 192,000.00
Tukang Kayu L.02 OH 2.0000 129,500.00 259,000.00
Tukang Batu L.02 OH 1.0000 129,500.00 129,500.00
Kepala tukang L.03 OH 0.3000 148,400.00 44,520.00
Mandor L.04 OH 0.0500 148,400.00 7,420.00
JUMLAH TENAGA KERJA 632,440.00
B BAHAN
Dolken kayu φ 8-10 Cm Batang 1.2500 34,100.00 42,625.00
Kayu m3 0.1800 2,582,700.00 464,886.00
Paku biasa Kg 0.0800 16,900.00 1,352.00
Besi Strip Kg 1.1000 12,100.00 13,310.00
Semen Portland Kg 35.0000 1,202.00 42,070.00
Pasir Pasang m3 0.1500 159,500.00 23,925.00
Pasir beton m3 0.1000 159,500.00 15,950.00
Koral beton m3 0.1500 145,000.00 21,750.00
Bata Merah Bh 30.0000 800.00 24,000.00
Seng plat Lbr 0.2500 66,400.00 16,600.00
Jendela naco bh 0.2000 194,900.00 38,980.00
Kaca polos m2 0.0800 #REF! #REF!
Kunci tanam Bh 0.1500 #REF! #REF!
Plywood 4 mm Lbr 0.0600 83,700.00 5,022.00
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) #REF!
E Overhead & profit 10% x Jumlah #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

JENIS PEKERJAAN : A.2.2.1.6 Pembuatan 1 m2 rumah jaga (konstruksi kayu)


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 1,352,653.72

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.0000 96,000.00 96,000.00
Tukang Kayu L.02 OH 1.5000 129,500.00 194,250.00
Kepala tukang L.03 OH 0.1500 148,400.00 22,260.00
Mandor L.04 OH 0.0500 148,400.00 7,420.00
JUMLAH TENAGA KERJA 319,930.00
B BAHAN
Dolken kayu φ 8-10 Cm Batang 3.0000 34,100.00 102,300.00
Kayu m3 0.2760 2,582,700.00 712,825.20
Paku biasa Kg 0.7000 16,900.00 11,830.00
Seng gelombang lbr 1.5000 55,200.00 82,800.00
JUMLAH HARGA BAHAN 909,755.20
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 1,229,685.20
E Overhead & profit 10% x Jumlah 122,968.52
F Harga Satuan Pekerjaan (D+E) 1,352,653.72

JENIS PEKERJAAN : A.2.2.1.7 Pembuatan 1 m2 gudang semen dan peralatan


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 1,233,719.30

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.0000 96,000.00 96,000.00
Tukang Kayu L.02 OH 2.0000 129,500.00 259,000.00
Kepala tukang L.03 OH 0.2000 148,400.00 29,680.00
Mandor L.04 OH 0.0500 148,400.00 7,420.00
JUMLAH TENAGA KERJA 392,100.00
B BAHAN
Dolken kayu φ 8-10 Cm Batang 1.7000 34,100.00 57,970.00
Kayu m3 0.2100 2,582,700.00 542,367.00
Paku biasa Kg 0.3000 16,900.00 5,070.00
Semen Portland Kg 10.5000 1,202.00 12,621.00
Pasir beton m3 0.0300 159,500.00 4,785.00
Koral beton m3 0.0500 145,000.00 7,250.00
Seng gelombang lbr 1.5000 55,200.00 82,800.00
Seng plat lbr 0.2500 66,400.00 16,600.00
JUMLAH HARGA BAHAN 729,463.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 1,121,563.00
E Overhead & profit 10% x Jumlah 112,156.30
F Harga Satuan Pekerjaan (D+E) 1,233,719.30
JENIS PEKERJAAN : A.2.2.1.8 Pembuatan 1 m2 bedeng pekerja
SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 1,264,607.52

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.0000 96,000.00 96,000.00
Tukang Kayu L.02 OH 2.0000 129,500.00 259,000.00
Kepala tukang L.03 OH 0.2000 148,400.00 29,680.00
Mandor L.04 OH 0.0500 148,400.00 7,420.00
JUMLAH TENAGA KERJA 392,100.00
B BAHAN
Dolken kayu φ 8-10 Cm Batang 1.2500 34,100.00 42,625.00
Kayu m3 0.1860 2,582,700.00 480,382.20
Paku biasa Kg 0.3000 16,900.00 5,070.00
Semen Portland Kg 18.0000 1,202.00 21,636.00
Pasir beton m3 0.0300 159,500.00 4,785.00
Koral beton m3 0.0500 145,000.00 7,250.00
Seng gelombang lbr 1.5000 55,200.00 82,800.00
Plywood 4 mm lbr 1.3500 83,700.00 112,995.00
JUMLAH HARGA BAHAN 757,543.20
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 1,149,643.20
E Overhead & profit 10% x Jumlah 114,964.32
F Harga Satuan Pekerjaan (D+E) 1,264,607.52

JENIS PEKERJAAN : A.2.2.1.4 Pengukuran dan pemasangan 1 M' Bouwplank


SATUAN : M'
HARGA SATUAN PEKERJAAN : Rp 79,543.31

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 96,000.00 9,600.00
Tukang Kayu L.02 OH 0.1000 129,500.00 12,950.00
Kepala Tukang L.03 OH 0.0100 148,400.00 1,484.00
Mandor L.04 OH 0.0050 148,400.00 742.00
JUMLAH TENAGA KERJA 24,776.00
B BAHAN
Kayu balok 5/7 M3 0.0120 2,426,600.00 29,119.20
Paku biasa 2" - 5" Kg 0.0200 16,900.00 338.00
Kayu papan 3/20 M3 0.0070 2,582,700.00 18,078.90
JUMLAH HARGA BAHAN 47,536.10
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 72,312.10
E Overhead & profit 10% x Jumlah 7,231.21
F Harga Satuan Pekerjaan (D+E) 79,543.31

JENIS PEKERJAAN : A.2.2.1.9 Pembersihan 1 m2 lapangan dan perataan


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 18,722.00

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 96,000.00 9,600.00
Mandor L.04 OH 0.0500 148,400.00 7,420.00
JUMLAH TENAGA KERJA 17,020.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 17,020.00
E Overhead & profit 10% x Jumlah 1,702.00
F Harga Satuan Pekerjaan (D+E) 18,722.00
HARGA SATUAN PEKERJAAN TANAH
JENIS PEKERJAAN : A.2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 83,281.00

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.7500 96,000.00 72,000.00
Mandor L.04 OH 0.0250 148,400.00 3,710.00
JUMLAH TENAGA KERJA 75,710.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 75,710.00
E Overhead & profit 10% x Jumlah 7,571.00
F Harga Satuan Pekerjaan (D+E) 83,281.00

JENIS PEKERJAAN : A.2.3.1.9 Pengurugan kembali 1 m3 galian tanah


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 60,962.00

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.5000 96,000.00 48,000.00
Mandor L.04 OH 0.0500 148,400.00 7,420.00
JUMLAH TENAGA KERJA 55,420.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 55,420.00
E Overhead & profit 10% x Jumlah 5,542.00
F Harga Satuan Pekerjaan (D+E) 60,962.00

JENIS PEKERJAAN : A.2.3.1.10Pemadatan 1 m3 tanah (per 20 Cm)


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 66,781.42

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.5000 96,000.00 48,000.00
Mandor L.04 OH 0.0500 148,400.00 7,420.00
JUMLAH TENAGA KERJA 55,420.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Stamper Jam 0.100 52,903.82 5,290.38
JUMLAH HARGA ALAT 5,290.38
D JUMLAH (A+B+C) 60,710.38
E Overhead & profit 10% x Jumlah 6,071.04
F Harga Satuan Pekerjaan (D+E) 66,781.42
JENIS PEKERJAAN : A.2.3.1.11Pengurugan 1 m3 dengan pasir urug
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 179,040.40

NO URAIAN HARGA SATUAN JUMLAH HARGA


KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3000 96,000.00 28,800.00
Mandor L.04 OH 0.0100 148,400.00 1,484.00
JUMLAH TENAGA KERJA 30,284.00
B BAHAN
Pasir urug M3 1.2000 110,400.00 132,480.00
JUMLAH HARGA BAHAN 132,480.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 162,764.00
E Overhead & profit 10% x Jumlah 16,276.40
F Harga Satuan Pekerjaan (D+E) 179,040.40

JENIS PEKERJAAN : A.2.3.1.14Pengurugan 1 m3 sirtu padat


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 214,357.00

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.2500 96,000.00 24,000.00
Mandor L.04 OH 0.0250 148,400.00 3,710.00
JUMLAH TENAGA KERJA 27,710.00
B BAHAN
Sirtu M3 1.2000 139,300.00 167,160.00
JUMLAH HARGA BAHAN 167,160.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 194,870.00
E Overhead & profit 10% x Jumlah 19,487.00
F Harga Satuan Pekerjaan (D+E) 214,357.00

JENIS PEKERJAAN : A.2.3.1.14Pengurugan 1 m3 tanah timbunan


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 195,481.00

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.2500 96,000.00 24,000.00
Mandor L.04 OH 0.0250 148,400.00 3,710.00
JUMLAH TENAGA KERJA 27,710.00
B BAHAN
Tanah Timbunan M3 1.2000 125,000.00 150,000.00
JUMLAH HARGA BAHAN 150,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 177,710.00
E Overhead & profit 10% x Jumlah 17,771.00
F Harga Satuan Pekerjaan (D+E) 195,481.00
HARGA SATUAN PEKERJAAN PONDASI BATU KALI
JENIS PEKERJAAN : A.3.2.1.2 Pemasangan 1 m3 pondasi batu kali Camp, 1PC : 4 Pasir Pasang
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 821,404.10

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.5000 96,000.00 144,000.00
Tukang Batu L.02 OH 0.7500 129,500.00 97,125.00
Kepala Tukang L.03 OH 0.0750 148,400.00 11,130.00
Mandor L.04 OH 0.0750 148,400.00 11,130.00
JUMLAH TENAGA KERJA 263,385.00
B BAHAN
Batu kali M3 1.2000 170,400.00 204,480.00
Semen Portland Kg 163.0000 1,202.00 195,926.00
Pasir Pasang M3 0.5200 159,500.00 82,940.00
JUMLAH HARGA BAHAN 483,346.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 746,731.00
E Overhead & profit 10% x Jumlah 74,673.10
F Harga Satuan Pekerjaan (D+E) 821,404.10

JENIS PEKERJAAN : A.3.2.1.9 Pemasangan 1 m3 pondasi batu kosong (Aanstampang)


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 428,046.30

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.7800 96,000.00 74,880.00
Tukang Batu L.02 OH 0.3900 129,500.00 50,505.00
Kepala Tukang L.03 OH 0.0390 148,400.00 5,787.60
Mandor L.04 OH 0.0390 148,400.00 5,787.60
JUMLAH TENAGA KERJA 136,960.20
B BAHAN
Batu kali M3 1.2000 170,400.00 204,480.00
Pasir urug M3 0.4320 110,400.00 47,692.80
JUMLAH HARGA BAHAN 252,172.80
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 389,133.00
E Overhead & profit 10% x Jumlah 38,913.30
F Harga Satuan Pekerjaan (D+E) 428,046.30

JENIS PEKERJAAN : A.4.1.1.4 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm,
w/c 0,87
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 709,585.38

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.2000 96,000.00 115,200.00
Tukang Batu L.02 OH 0.2000 129,500.00 25,900.00
Kepala Tukang L.03 OH 0.0200 148,400.00 2,968.00
Mandor L.04 OH 0.0600 148,400.00 8,904.00
JUMLAH TENAGA KERJA 152,972.00
B BAHAN
Semen Portland Kg 230.0000 1,202.00 276,460.00
Pasir beton Kg 893.0000 113.93 101,738.21
Kerikil (Maks 30 mm) Kg 1027.0000 107.41 110,307.41
Air Liter 200.0000 18.00 3,600.00
JUMLAH HARGA BAHAN 492,105.62
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 645,077.62
E Overhead & profit 10% x Jumlah 64,507.76
F Harga Satuan Pekerjaan (D+E) 709,585.38
JENIS PEKERJAAN : A.4.4.1.7 Pemasangan 1 m2 pondasi dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp,
1PC : 2 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 143,328.79

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.300 96,000.00 28,800.00
Tukang Batu L.02 OH 0.100 129,500.00 12,950.00
Kepala Tukang L.03 OH 0.010 148,400.00 1,484.00
Mandor L.04 OH 0.015 148,400.00 2,226.00
JUMLAH TENAGA KERJA 45,460.00
B BAHAN
Bata Merah Bh 70.000 800.00 56,000.00
Semen Portland Kg 18.950 1,202.00 22,777.90
Pasir Pasang M3 0.038 159,500.00 6,061.00
JUMLAH HARGA BAHAN 84,838.90
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 130,298.90
E Overhead & profit 10% x Jumlah 13,029.89
F Harga Satuan Pekerjaan (D+E) 143,328.79

HARGA SATUAN PEKERJAAN BETON


JENIS PEKERJAAN : A.4.1.1.4 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm,
w/c 0,87
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 709,585.38

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.2000 96,000.00 115,200.00
Tukang Batu L.02 OH 0.2000 129,500.00 25,900.00
Kepala Tukang L.03 OH 0.0200 148,400.00 2,968.00
Mandor L.04 OH 0.0600 148,400.00 8,904.00
JUMLAH TENAGA KERJA 152,972.00
B BAHAN
Semen Portland Kg 230.0000 1,202.00 276,460.00
Pasir beton Kg 893.0000 113.93 101,738.21
Kerikil (Maks 30 mm) Kg 1027.0000 107.41 110,307.41
Air Liter 200.0000 18.00 3,600.00
JUMLAH HARGA BAHAN 492,105.62
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 645,077.62
E Overhead & profit 10% x Jumlah 64,507.76
F Harga Satuan Pekerjaan (D+E) 709,585.38
JENIS PEKERJAAN : A.4.1.1.5 Membuat beton mutu f3c = 14,5 Mpa (K 175), slump (12 ± 2) Cm, w/c 0,66
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 883,646.32

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.6500 96,000.00 158,400.00
Tukang Batu L.02 OH 0.2750 129,500.00 35,612.50
Kepala Tukang L.03 OH 0.0280 148,400.00 4,155.20
Mandor L.04 OH 0.0830 148,400.00 12,317.20
JUMLAH TENAGA KERJA 210,484.90
B BAHAN
Semen Portland Kg 326.0000 1,202.00 391,852.00
Pasir beton Kg 760.0000 113.93 86,585.71
Kerikil (Maks 30 mm) Kg 1029.0000 107.41 110,522.22
Air Liter 215.0000 18.00 3,870.00
JUMLAH HARGA BAHAN 592,829.94
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 803,314.84
E Overhead & profit 10% x Jumlah 80,331.48
F Harga Satuan Pekerjaan (D+E) 883,646.32

JENIS PEKERJAAN : A.4.1.1.7 Membuat beton mutu f3c = 19,3 Mpa (K 225), slump (12 ± 2) Cm, w/c 0,58
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 937,502.06

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.6500 96,000.00 158,400.00
Tukang Batu L.02 OH 0.2750 129,500.00 35,612.50
Kepala Tukang L.03 OH 0.0280 148,400.00 4,155.20
Mandor L.04 OH 0.0830 148,400.00 12,317.20
JUMLAH TENAGA KERJA 210,484.90
B BAHAN
Semen Portland Kg 371.0000 1,202.00 445,942.00
Pasir beton Kg 698.0000 113.93 79,522.14
Kerikil (Maks 30 mm) Kg 1047.0000 107.41 112,455.56
Air Liter 215.0000 18.00 3,870.00
JUMLAH HARGA BAHAN 641,789.70
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 852,274.60
E Overhead & profit 10% x Jumlah 85,227.46
F Harga Satuan Pekerjaan (D+E) 937,502.06

JENIS PEKERJAAN : A.4.1.1.17Pembesian 10 kg dengan besi polos


SATUAN : Kg
HARGA SATUAN : Rp 14,127.56

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0700 96,000.00 6,720.00
Tukang Besi L.02 OH 0.0700 129,500.00 9,065.00
Kepala Tukang L.03 OH 0.0070 148,400.00 1,038.80
Mandor L.04 OH 0.0040 148,400.00 593.60
JUMLAH TENAGA KERJA 17,417.40
B BAHAN
Besi beton (polos) Kg 10.5000 10,300.00 108,150.00
Kawat beton Kg 0.1500 19,100.00 2,865.00
JUMLAH HARGA BAHAN 111,015.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 128,432.40
Untuk 1 Kg 0.1 12,843.24
E Overhead & profit 10% x Jumlah 1,284.32
F Harga Satuan Pekerjaan (D+E) 14,127.56
JENIS PEKERJAAN : A.4.1.1.17Pembesian 10 kg dengan besi ulir
SATUAN : Kg
HARGA SATUAN : Rp 14,705.06

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0700 96,000.00 6,720.00
Tukang Besi L.02 OH 0.0700 129,500.00 9,065.00
Kepala Tukang L.03 OH 0.0070 148,400.00 1,038.80
Mandor L.04 OH 0.0040 148,400.00 593.60
JUMLAH TENAGA KERJA 17,417.40
B BAHAN
Besi beton (ulir) Kg 10.5000 10,800.00 113,400.00
Kawat beton Kg 0.1500 19,100.00 2,865.00
JUMLAH HARGA BAHAN 116,265.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 133,682.40
Untuk 1 Kg 0.1 13,368.24
E Overhead & profit 10% x Jumlah 1,336.82
F Harga Satuan Pekerjaan (D+E) 14,705.06

JENIS PEKERJAAN : A.4.1.1.20Pemasangan 1 m2 bekisting untuk pondasi


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 160,804.38

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.5200 96,000.00 49,920.00
Tukang Kayu L.02 OH 0.2600 129,500.00 33,670.00
Kepala Tukang L.03 OH 0.0260 148,400.00 3,858.40
Mandor L.04 OH 0.0260 148,400.00 3,858.40
JUMLAH TENAGA KERJA 91,306.80
B BAHAN
Kayu kelas III M3 0.0400 2,582,700.00 103,308.00
Paku 5 - 10 Cm Kg 0.3000 16,900.00 5,070.00
Minyak bekisting Liter 0.1000 13,800.00 1,380.00
JUMLAH HARGA BAHAN 109,758.00
BAHAN 2 X PEMAKAIAN 54,879.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 146,185.80
E Overhead & profit 10% x Jumlah 14,618.58
F Harga Satuan Pekerjaan (D+E) 160,804.38

JENIS PEKERJAAN : A.4.1.1.21Pemasangan 1 m2 bekisting untuk sloof


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 167,906.81

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.5200 96,000.00 49,920.00
Tukang Kayu L.02 OH 0.2600 129,500.00 33,670.00
Kepala Tukang L.03 OH 0.0260 148,400.00 3,858.40
Mandor L.04 OH 0.0260 148,400.00 3,858.40
JUMLAH TENAGA KERJA 91,306.80
B BAHAN
Kayu kelas III M3 0.0450 2,582,700.00 116,221.50
Paku 5 - 10 Cm Kg 0.3000 16,900.00 5,070.00
Minyak bekisting Liter 0.1000 13,800.00 1,380.00
JUMLAH HARGA BAHAN 122,671.50
BAHAN 2 X PEMAKAIAN 61,335.75
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 152,642.55
E Overhead & profit 10% x Jumlah 15,264.26
F Harga Satuan Pekerjaan (D+E) 167,906.81
JENIS PEKERJAAN : A.4.1.1.22Pemasangan 1 m2 bekisting untuk kolom
SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 279,869.32

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 96,000.00 63,360.00
Tukang Kayu L.02 OH 0.3300 129,500.00 42,735.00
Kepala Tukang L.03 OH 0.0330 148,400.00 4,897.20
Mandor L.04 OH 0.0330 148,400.00 4,897.20
JUMLAH TENAGA KERJA 115,889.40
B BAHAN
Kayu kelas III M3 0.0400 2,582,700.00 103,308.00
Paku 5 - 10 Cm Kg 0.4000 16,900.00 6,760.00
Minyak bekisting Liter 0.2000 13,800.00 2,760.00
Balok kayu kelas II M3 0.0150 3,029,100.00 45,436.50
Plywod tebal 9 mm Lbr 0.3500 144,600.00 50,610.00
Dolken kayu φ 8-10 Cm Batang 2.0000 34,100.00 68,200.00
JUMLAH HARGA BAHAN 277,074.50
BAHAN 2 X PEMAKAIAN 138,537.25
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 254,426.65
E Overhead & profit 10% x Jumlah 25,442.67
F Harga Satuan Pekerjaan (D+E) 279,869.32

JENIS PEKERJAAN : A.4.1.1.23Pemasangan 1 m2 bekisting untuk balok


SATUAN : M2
HARGA SATUAN : Rp 284,867.33

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 96,000.00 63,360.00
Tukang Kayu L.02 OH 0.3300 129,500.00 42,735.00
Kepala Tukang L.03 OH 0.0330 148,400.00 4,897.20
Mandor L.04 OH 0.0330 148,400.00 4,897.20
JUMLAH TENAGA KERJA 115,889.40
B BAHAN
Kayu kelas III M3 0.0400 2,582,700.00 103,308.00
Paku 5 - 10 Cm Kg 0.4000 16,900.00 6,760.00
Minyak bekisting Liter 0.2000 13,800.00 2,760.00
Balok kayu kelas II M3 0.0180 3,029,100.00 54,523.80
Plywod tebal 9 mm Lbr 0.3500 144,600.00 50,610.00
Dolken kayu φ 8-10 Cm Batang 2.0000 34,100.00 68,200.00
JUMLAH HARGA BAHAN 286,161.80
BAHAN 2 X PEMAKAIAN 143,080.90
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 258,970.30
E Overhead & profit 10% x Jumlah 25,897.03
F Harga Satuan Pekerjaan (D+E) 284,867.33
JENIS PEKERJAAN : A.4.1.1.24Pemasangan 1 m2 bekisting untuk Lantai
SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 354,889.32

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 96,000.00 63,360.00
Tukang L.02 OH 0.3300 129,500.00 42,735.00
Kepala tukang L.03 OH 0.0330 148,400.00 4,897.20
Mandor L.04 OH 0.0330 148,400.00 4,897.20
JUMLAH TENAGA KERJA 115,889.40
B BAHAN
Kayu kelas III m3 0.0400 2,582,700.00 103,308.00
Paku 5 - 10 Cm Kg 0.4000 16,900.00 6,760.00
Minyak bekisting Liter 0.2000 13,800.00 2,760.00
Balok kayu kelas II m3 0.0150 3,029,100.00 45,436.50
Plywod tebal 9 mm Lbr 0.3500 144,600.00 50,610.00
Dolken kayu φ 8-10 Batang 6.0000 34,100.00 204,600.00
JUMLAH HARGA BAHAN 413,474.50
BAHAN 2 X PEMAKAIAN 206,737.25
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 322,626.65
E Overhead & profit 10% x Jumlah 32,262.67
F Harga Satuan Pekerjaan (D+E) 354,889.32

JENIS PEKERJAAN : Pemasangan 1M3 Beton Saluran


SATUAN : M3
HARGA SATUAN PEKERJAAN : #REF!

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Besi Kg 33.6017 14,127.56 474,709.70
Beton M3 1.1000 883,646.32 972,010.95
Bekesting M2 2.7240 167,906.81 457,378.14

JUMLAH TENAGA KERJA 1,904,098.79

JENIS PEKERJAAN : 1 M² BONGKAR PASANG MEMASANG PAVING BLOCK


SATUAN : M1
HARGA SATUAN : Rp 154,972.40

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3250 96,000.00 31,200.00
Tukang Besi L.02 OH 0.6500 129,500.00 84,175.00
Kepala Tukang L.03 OH 0.0650 148,400.00 9,646.00
Mandor L.04 OH 0.0325 148,400.00 4,823.00
JUMLAH TENAGA KERJA 129,844.00
B BAHAN

Pasir Urug M3 0.1000 110,400.00 11,040.00

JUMLAH HARGA BAHAN 11,040.00


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 140,884.00
E Overhead & profit 10% x Jumlah 14,088.40
F Harga Satuan Pekerjaan (D+E) 154,972.40
HARGA SATUAN PEKERJAAN KAYU (PINTU DAN JENDELA)
JENIS PEKERJAAN : A.4.6.1.1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kls I
SATUAN : M3
HARGA SATUAN : Rp 9,055,530

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 7.000 96,000.00 672,000.00
Tukang L.02 OH 21.000 129,500.00 2,719,500.00
Kepala tukang L.03 OH 2.100 148,400.00 311,640.00
Mandor L.04 OH 0.350 148,400.00 51,940.00
JUMLAH TENAGA KERJA 3,755,080.00
B BAHAN
Balok kayu Klas I m3 1.100 4,035,700.00 4,439,270.00
Paku 10 Cm Kg 1.250 17,000.00 21,250.00
Lem kayu Kg 1.000 16,700.00 16,700.00
JUMLAH HARGA BAHAN 4,477,220.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 8,232,300.00
E Overhead & profit 10% x Jumlah 823,230.00
F Harga Satuan Pekerjaan (D+E) 9,055,530.00

JENIS PEKERJAAN : A.4.6.1.5 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I
SATUAN : M2
HARGA SATUAN : Rp 768,173

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.000 96,000.00 96,000.00
Tukang L.02 OH 3.000 129,500.00 388,500.00
Kepala tukang L.03 OH 0.300 148,400.00 44,520.00
Mandor L.04 OH 0.050 148,400.00 7,420.00
JUMLAH TENAGA KERJA 536,440.00
B BAHAN
Papan kayu Klas I m3 0.040 4,026,600.00 161,064.00
Lem kayu Kg 0.050 16,700.00 835.00
JUMLAH HARGA BAHAN 161,899.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 698,339.00
E Overhead & profit 10% x Jumlah 69,833.90
F Harga Satuan Pekerjaan (D+E) 768,172.90

JENIS PEKERJAAN : A.4.6.1.10Pemasangan 1 m2 jalusi kusen, kayu kelas II


SATUAN : M2
HARGA SATUAN : Rp 650,905

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.670 96,000.00 64,320.00
Tukang L.02 OH 2.000 129,500.00 259,000.00
Kepala tukang L.03 OH 0.200 148,400.00 29,680.00
Mandor L.04 OH 0.335 148,400.00 49,714.00
JUMLAH TENAGA KERJA 402,714.00
B BAHAN
Papan kayu Klas II m3 0.060 3,105,800.00 186,348.00
Paku 1 Cm - 2,5 Cm Kg 0.150 17,800.00 2,670.00
JUMLAH HARGA BAHAN 189,018.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 591,732.00
E Overhead & profit 10% x Jumlah 59,173.20
F Harga Satuan Pekerjaan (D+E) 650,905.20
JENIS PEKERJAAN : A.4.6.1.27Pemasangan 1 m2 Dinding GRC T 4 mm ukuran (120x240) Cm
SATUAN : M2
HARGA SATUAN : Rp 45,472

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.025 96,000.00 2,400.00
Tukang Kayu L.02 OH 0.075 129,500.00 9,712.50
Kepala Tukang L.03 OH 0.008 148,400.00 1,187.20
Mandor L.04 OH 0.001 148,400.00 148.40
JUMLAH TENAGA KERJA 13,448.10
B BAHAN
GRC 4 mm M3 0.400 67,500.00 27,000.00
Paku 5 dan 10 Cm Kg 0.050 17,800.00 890.00
JUMLAH HARGA BAHAN 27,890.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 41,338.10
E Overhead & profit 10% x Jumlah 4,133.81
F Harga Satuan Pekerjaan (D+E) 45,471.91

HARGA SATUAN PEKERJAAN KAYU (KUDA KUDA)


JENIS PEKERJAAN : A.4.6.1.13Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kls I (Timbalun)
SATUAN : M3
HARGA SATUAN : Rp 7,150,781

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 4.000 96,000.00 384,000.00
Tukang Kayu L.02 OH 12.000 129,500.00 1,554,000.00
Kepala Tukang L.03 OH 1.200 148,400.00 178,080.00
Mandor L.04 OH 0.200 148,400.00 29,680.00
JUMLAH TENAGA KERJA 2,145,760.00
B BAHAN
Kayu Timbalun ( Balok) Klas I M3 1.100 3,707,500.00 4,078,250.00
Besi strip tebal 5 mm Kg 15.000 12,100.00 181,500.00
Paku 12 Cm Kg 5.600 17,000.00 95,200.00
JUMLAH HARGA BAHAN 4,354,950.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 6,500,710.00
E Overhead & profit 10% x Jumlah 650,071.00
F Harga Satuan Pekerjaan (D+E) 7,150,781.00

JENIS PEKERJAAN : A.4.6.1.15Pemasangan 1 m3 konstruksi gordeng, kayu kelas I (Timbalun)


SATUAN : M3
HARGA SATUAN : Rp 6,158,027

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 2.400 96,000.00 230,400.00
Tukang Kayu L.02 OH 7.200 129,500.00 932,400.00
Kepala Tukang L.03 OH 0.720 148,400.00 106,848.00
Mandor L.04 OH 0.120 148,400.00 17,808.00
JUMLAH TENAGA KERJA 1,287,456.00
B BAHAN
Kayu Timbalun ( Balok) Klas I M3 1.100 3,707,500.00 4,078,250.00
Besi strip tebal 5 mm Kg 15.000 12,100.00 181,500.00
Paku 12 Cm Kg 3.000 17,000.00 51,000.00
JUMLAH HARGA BAHAN 4,310,750.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 5,598,206.00
E Overhead & profit 10% x Jumlah 559,820.60
F Harga Satuan Pekerjaan (D+E) 6,158,026.60
JENIS PEKERJAAN : A.4.6.1.22Pemasangan 1 m' lisplank ukuran (3 x 30) Cm, kayu kelas II
SATUAN : M'
HARGA SATUAN : Rp 81,641

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.100 96,000.00 9,600.00
Tukang Kayu L.02 OH 0.200 129,500.00 25,900.00
Kepala Tukang L.03 OH 0.020 148,400.00 2,968.00
Mandor L.04 OH 0.005 148,400.00 742.00
JUMLAH TENAGA KERJA 39,210.00
B BAHAN
Papan kayu Klas II M3 0.0110 3,105,800.00 34,163.80
Paku 5 dan 10 Cm Kg 0.050 16,900.00 845.00
JUMLAH HARGA BAHAN 35,008.80
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 74,218.80
E Overhead & profit 10% x Jumlah 7,421.88
F Harga Satuan Pekerjaan (D+E) 81,640.68

JENIS PEKERJAAN : A.4.6.1.23Pemasangan 1 m' talang miring seng plat BJLS 30


SATUAN : M'
HARGA SATUAN : Rp 191,065

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.150 96,000.00 14,400.00
Tukang Kayu L.02 OH 0.400 129,500.00 51,800.00
Kepala Tukang L.03 OH 0.025 148,400.00 3,710.00
Mandor L.04 OH 0.001 148,400.00 148.40
JUMLAH TENAGA KERJA 70,058.40
B BAHAN
Seng Plat BJLS 30 Lbr 0.500 66,400.00 33,200.00
Paku biasa 1 cm - 4 cm Kg 0.015 17,800.00 267.00
Papan kayu Klas II M3 0.019 3,105,800.00 59,010.20
Meni Besi Kg 0.300 37,200.00 11,160.00
JUMLAH HARGA BAHAN 103,637.20
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 173,695.60
E Overhead & profit 10% x Jumlah 17,369.56
F Harga Satuan Pekerjaan (D+E) 191,065.16

HARGA SATUAN PEKERJAAN PENUTUP ATAP


JENIS PEKERJAAN : A.4.5.2.21Pemasangan 1 m2 atap seng gelombang (warna)
SATUAN : M2
HARGA SATUAN : Rp 107,086

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.120 96,000.00 11,520.00
Tukang Kayu L.02 OH 0.060 129,500.00 7,770.00
Kepala Tukang L.03 OH 0.006 148,400.00 890.40
Mandor L.04 OH 0.006 148,400.00 890.40
JUMLAH TENAGA KERJA 21,070.80
B BAHAN
Tebal 0.20 11 bd merk Swan Brand/Gjh. Ber Lbr 0.70 108,200.00 75,740.00
Paku seng gelombang Kg 0.02 27,000.00 540.00
JUMLAH HARGA BAHAN 76,280.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 97,350.80
E Overhead & profit 10% x Jumlah 9,735.08
F Harga Satuan Pekerjaan (D+E) 107,085.88
JENIS PEKERJAAN : A.4.5.2.22Pemasangan 1 m' nok atap seng (warna)
SATUAN : M'
HARGA SATUAN : Rp 50,539

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.150 96,000.00 14,400.00
Tukang Kayu L.02 OH 0.070 129,500.00 9,065.00
Kepala Tukang L.03 OH 0.007 148,400.00 1,038.80
Mandor L.04 OH 0.006 148,400.00 890.40
JUMLAH TENAGA KERJA 25,394.20
B BAHAN
Seng Plat BJLS 20 Warna Lbr 0.30 66,700.00 20,010.00
Paku seng gelombang Kg 0.02 27,000.00 540.00
JUMLAH HARGA BAHAN 20,550.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 45,944.20
E Overhead & profit 10% x Jumlah 4,594.42
F Harga Satuan Pekerjaan (D+E) 50,538.62

JENIS PEKERJAAN : A.4.5.2.23Pemasangan 1 m' bola bola atap seng (warna)


SATUAN : M'
HARGA SATUAN : Rp 50,539

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.150 96,000.00 14,400.00
Tukang Kayu L.02 OH 0.070 129,500.00 9,065.00
Kepala Tukang L.03 OH 0.007 148,400.00 1,038.80
Mandor L.04 OH 0.006 148,400.00 890.40
JUMLAH TENAGA KERJA 25,394.20
B BAHAN
Seng Plat BJLS 20 Warna Lbr 0.30 66,700.00 20,010.00
Paku seng gelombang Kg 0.02 27,000.00 540.00
JUMLAH HARGA BAHAN 20,550.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 45,944.20
E Overhead & profit 10% x Jumlah 4,594.42
F Harga Satuan Pekerjaan (D+E) 50,538.62

HARGA SATUAN PEKERJAAN PLESTERAN


JENIS PEKERJAAN : A.4.4.2.2 Pemasangan 1 m2 Plesteran 1PC : 2 Pasir Pasang tebal 15 mm
SATUAN : M2
HARGA SATUAN : Rp 74,971.87

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3000 96,000.00 28,800.00
Tukang Batu L.02 OH 0.1500 129,500.00 19,425.00
Kepala Tukang L.03 OH 0.0150 148,400.00 2,226.00
Mandor L.04 OH 0.0150 148,400.00 2,226.00
JUMLAH TENAGA KERJA 52,677.00
B BAHAN
Semen Portland Kg 10.2240 1,202.00 12,289.25
Pasir Pasang M3 0.0200 159,500.00 3,190.00
JUMLAH HARGA BAHAN 15,479.25
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 68,156.25
E Overhead & profit 10% x Jumlah 6,815.62
F Harga Satuan Pekerjaan (D+E) 74,971.87
JENIS PEKERJAAN : A.4.4.2.4 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm
SATUAN : M2
HARGA SATUAN : Rp 70,406.03

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.3000 96,000.00 28,800.00
Tukang Batu L.02 OH 0.1500 129,500.00 19,425.00
Kepala Tukang L.03 OH 0.0150 148,400.00 2,226.00
Mandor L.04 OH 0.0150 148,400.00 2,226.00
JUMLAH TENAGA KERJA 52,677.00
B BAHAN
Semen Portland Kg 6.2400 1,202.00 7,500.48
Pasir Pasang M3 0.0240 159,500.00 3,828.00
JUMLAH HARGA BAHAN 11,328.48
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 64,005.48
E Overhead & profit 10% x Jumlah 6,400.55
F Harga Satuan Pekerjaan (D+E) 70,406.03

JENIS PEKERJAAN : A.4.4.2.15Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang (Afwerking) tebal 20 mm


SATUAN : M2
HARGA SATUAN : Rp 94,201.18

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.4000 96,000.00 38,400.00
Tukang Batu L.02 OH 0.2000 129,500.00 25,900.00
Kepala Tukang L.03 OH 0.0200 148,400.00 2,968.00
Mandor L.04 OH 0.0220 148,400.00 3,264.80
JUMLAH TENAGA KERJA 70,532.80
B BAHAN
Semen Portland Kg 8.3200 1,202.00 10,000.64
Pasir Pasang M3 0.0320 159,500.00 5,104.00
JUMLAH HARGA BAHAN 15,104.64
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 85,637.44
E Overhead & profit 10% x Jumlah 8,563.74
F Harga Satuan Pekerjaan (D+E) 94,201.18

JENIS PEKERJAAN : A.4.4.2.27Pemasangan 1 m2 Acian


SATUAN : M2
HARGA SATUAN : Rp 42,926.95

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.2000 96,000.00 19,200.00
Tukang Batu L.02 OH 0.1000 129,500.00 12,950.00
Kepala Tukang L.03 OH 0.0100 148,400.00 1,484.00
Mandor L.04 OH 0.0100 148,400.00 1,484.00
JUMLAH TENAGA KERJA 35,118.00
B BAHAN
Semen Portland Kg 3.2500 1,202.00 3,906.50
JUMLAH HARGA BAHAN 3,906.50
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 39,024.50
E Overhead & profit 10% x Jumlah 3,902.45
F Harga Satuan Pekerjaan (D+E) 42,926.95
JENIS PEKERJAAN : A.4.4.2.21Pemasangan 1 m2 Plesteran Granit Chip tebal 1 Cm
SATUAN : M2
HARGA SATUAN : #REF!

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.5600 96,000.00 53,760.00
Tukang Batu L.02 OH 0.2100 129,500.00 27,195.00
Kepala Tukang L.03 OH 0.0210 148,400.00 3,116.40
Mandor L.04 OH 0.0280 148,400.00 4,155.20
JUMLAH TENAGA KERJA 88,226.60
B BAHAN
Granit Chip Hitam Kg 13.0000 #REF! #REF!
Granit Chip Putih Kg 7.0000 #REF! #REF!
Semen Portland Zak 0.2800 1,202.00 336.56
Alat Bantu 1.0000 25,000.00 25,000.00
Plesteran M2 1.0000 64,005.48 64,005.48
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) #REF!
E Overhead & profit 10% x Jumlah #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


JENIS PEKERJAAN : A.4.1.1.5 Membuat beton mutu f3c = 14,5 Mpa (K 175), slump (12 ± 2) Cm, w/c 0,66
w/c 0,66
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 883,646.32

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.650 96,000.00 158,400.00
Tukang Batu L.02 OH 0.275 129,500.00 35,612.50
Kepala Tukang L.03 OH 0.028 148,400.00 4,155.20
Mandor L.04 OH 0.083 148,400.00 12,317.20
JUMLAH TENAGA KERJA 210,484.90
B BAHAN
Semen Portland Kg 326.000 1,202.00 391,852.00
Pasir beton Kg 760 113.93 86,585.71
Kerikil (Maks 30 mm) Kg 1029 107.41 110,522.22
Air Liter 215 18.00 3,870.00
JUMLAH HARGA BAHAN 592,829.94
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 803,314.84
E Overhead & profit 10% x Jumlah 80,331.48
F Harga Satuan Pekerjaan (D+E) 883,646.32
JENIS PEKERJAAN : A.4.4.3.35Pemasangan 1 m2 Lantai keramik ukuran 30 x 30
SATUAN : M2
HARGA SATUAN : #REF!

URAIAN HARGA SATUAN JUMLAH HARGA


NO KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.700 96,000.00 67,200.00
Tukang Batu L.02 OH 0.350 129,500.00 45,325.00
Kepala Tukang L.03 OH 0.035 148,400.00 5,194.00
Mandor L.04 OH 0.035 148,400.00 5,194.00
JUMLAH TENAGA KERJA 122,913.00
B BAHAN
Keramik ukuran 30 Cm x 30 Cm Doos 1.0500 #REF! #REF!
Semen Portland Kg 10.000 1,202.00 12,020.00
Semen Warna Kg 0.500 10,700.00 5,350.00
Pasir Pasang M3 0.045 159,500.00 7,177.50
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) #REF!
E Overhead & profit 10% x Jumlah #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

JENIS PEKERJAAN : A.4.4.3.35Pemasangan 1 m2 Lantai keramik ukuran 40 Cm x 40 Cm (Asia Tile)


SATUAN : M2
HARGA SATUAN : #REF!

URAIAN HARGA SATUAN JUMLAH HARGA


NO KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.700 96,000.00 67,200.00
Tukang Batu L.02 OH 0.350 129,500.00 45,325.00
Kepala Tukang L.03 OH 0.035 148,400.00 5,194.00
Mandor L.04 OH 0.035 148,400.00 5,194.00
JUMLAH TENAGA KERJA 122,913.00
B BAHAN
Keramik 40 x 40 (Asia Tile) Bh 6.25 #REF! #REF!
Semen Portland Kg 10.00 1,202.00 12,020.00
Semen Warna Kg 1.500 10,700.00 16,050.00
Pasir Pasang M3 0.045 159,500.00 7,177.50
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) #REF!
E Overhead & profit 10% x Jumlah #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

JENIS PEKERJAAN : A.4.4.3.40Pemasangan 1 m' Bon Bon keramik ukuran 10 Cm


SATUAN : M'
HARGA SATUAN : #REF!

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0900 96,000.00 8,640.00
Tukang L.02 OH 0.0900 129,500.00 11,655.00
Kepala tukang L.03 OH 0.0090 148,400.00 1,335.60
Mandor L.04 OH 0.0050 148,400.00 742.00
JUMLAH TENAGA KERJA 22,372.60
B BAHAN
Bon bon keramik 10 Cm Bh 10.0000 #REF! #REF!
Semen warna (tepung affa) Kg 0.0500 10,700.00 535.00
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) #REF!
E Overhead & profit 10% x Jumlah #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
JENIS PEKERJAAN : A.4.4.2.27Pemasangan 1 m2 Acian Lantai
SATUAN : M2
HARGA SATUAN : Rp 42,926.95

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.2000 96,000.00 19,200.00
Tukang Batu L.02 OH 0.1000 129,500.00 12,950.00
Kepala Tukang L.03 OH 0.0100 148,400.00 1,484.00
Mandor L.04 OH 0.0100 148,400.00 1,484.00
JUMLAH TENAGA KERJA 35,118.00
B BAHAN
Semen Portland Kg 3.2500 1,202.00 3,906.50
JUMLAH HARGA BAHAN 3,906.50
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 39,024.50
E Overhead & profit 10% x Jumlah 3,902.45
F Harga Satuan Pekerjaan (D+E) 42,926.95

HARGA SATUAN PEKERJAAN KAYU (RANGKA PLAFOND)


JENIS PEKERJAAN : A.4.6.1.20Pemasangan 1 m2 rangka langit-langit (60 x 60) Cm, kayu kelas II
SATUAN : M2
HARGA SATUAN : Rp 129,344

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.200 96,000.00 19,200.00
Tukang Kayu L.02 OH 0.300 129,500.00 38,850.00
Kepala Tukang L.03 OH 0.030 148,400.00 4,452.00
Mandor L.04 OH 0.010 148,400.00 1,484.00
JUMLAH TENAGA KERJA 63,986.00
B BAHAN
Kaso-kaso 5 x 7 Cm (Kayu Klas II) M3 0.0163 3,029,100.00 49,374.33
Paku 7 dan 10 Cm Kg 0.2500 16,900.00 4,225.00
JUMLAH HARGA BAHAN 53,599.33
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 117,585.33
E Overhead & profit 10% x Jumlah 11,758.53
F Harga Satuan Pekerjaan (D+E) 129,343.86

HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


JENIS PEKERJAAN : A.4.5.1.2 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) Cm, tebal 4 mm
SATUAN : M2
HARGA SATUAN : Rp 54,777

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.100 96,000.00 9,600.00
Tukang Kayu L.02 OH 0.100 129,500.00 12,950.00
Kepala Tukang L.03 OH 0.010 148,400.00 1,484.00
Mandor L.04 OH 0.005 148,400.00 742.00
JUMLAH TENAGA KERJA 24,776.00
B BAHAN
Tripleks 4 mm Lembar 0.375 65,300.00 24,487.50
Paku triplek Kg 0.030 17,800.00 534.00
JUMLAH HARGA BAHAN 25,021.50
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 49,797.50
E Overhead & profit 10% x Jumlah 4,979.75
F Harga Satuan Pekerjaan (D+E) 54,777.25
JENIS PEKERJAAN : A.4.5.1.3 Pemasangan 1 m' les kayu profil
SATUAN : M2
HARGA SATUAN : Rp 31,576

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.050 96,000.00 4,800.00
Tukang Kayu L.02 OH 0.050 129,500.00 6,475.00
Kepala Tukang L.03 OH 0.005 148,400.00 742.00
Mandor L.04 OH 0.003 148,400.00 445.20
JUMLAH TENAGA KERJA 12,462.20
B BAHAN
Les Profil (3x3.5x400) M1 1.050 15,300.00 16,065.00
Paku triplek Kg 0.010 17,800.00 178.00
JUMLAH HARGA BAHAN 16,243.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 28,705.20
E Overhead & profit 10% x Jumlah 2,870.52
F Harga Satuan Pekerjaan (D+E) 31,575.72

HARGA SATUAN PEKERJAAN KUNCI DAN KACA ALLUMINIUM


JENIS PEKERJAAN : A.4.6.2.1 Pemasangan 1 buah kunci tanam antik
SATUAN : Bh
HARGA SATUAN : #REF!

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0600 96,000.00 5,760.00
Tukang Kayu L.02 OH 0.6000 129,500.00 77,700.00
Kepala Tukang L.03 OH 0.0600 148,400.00 8,904.00
Mandor L.04 OH 0.0030 148,400.00 445.20
JUMLAH TENAGA KERJA 92,809.20
B BAHAN
Kunci tanam antik Set 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) #REF!
E Overhead & profit 10% x Jumlah #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

JENIS PEKERJAAN : A.4.6.2.5 Pemasangan 1 buah engsel pintu


SATUAN : Bh
HARGA SATUAN : #REF!

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 96,000.00 1,440.00
Tukang L.02 OH 0.1500 129,500.00 19,425.00
Kepala tukang L.03 OH 0.0150 148,400.00 2,226.00
Mandor L.04 OH 0.0008 148,400.00 118.72
JUMLAH TENAGA KERJA 23,209.72
B BAHAN
Engsel pintu Bh 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) #REF!
E Overhead & profit 10% x Jumlah #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
JENIS PEKERJAAN : A.4.6.2.6 Pemasangan 1 buah engsel jendela kupu-kupu
SATUAN : Bh
HARGA SATUAN : #REF!

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0100 96,000.00 960.00
Tukang Kayu L.02 OH 0.1000 129,500.00 12,950.00
Kepala Tukang L.03 OH 0.0100 148,400.00 1,484.00
Mandor L.04 OH 0.0005 148,400.00 74.20
JUMLAH TENAGA KERJA 15,468.20
B BAHAN
Engsel kupu-kupu Bh 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) #REF!
E Overhead & profit 10% x Jumlah #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

JENIS PEKERJAAN : A.4.6.2.7 Pemasangan 1 buah Tarikan Antik Jendela


SATUAN : Bh
HARGA SATUAN : #REF!

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.100 96,000.00 9,600.00
Tukang Kayu L.02 OH 0.200 129,500.00 25,900.00
Kepala Tukang L.03 OH 0.020 148,400.00 2,968.00
Mandor L.04 OH 0.0005 148,400.00 74.20
JUMLAH TENAGA KERJA 38,542.20
B BAHAN
Tarikan Antik Jendela Bh 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 38,542.20
E Overhead & profit 0% x Jumlah #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

JENIS PEKERJAAN : A.4.6.2.5 Pemasangan 1 buah Gerendel pintu


SATUAN : Bh
HARGA SATUAN : #REF!

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.015 96,000.00 1,440.00
Tukang Kayu L.02 OH 0.150 129,500.00 19,425.00
Kepala Tukang L.03 OH 0.015 148,400.00 2,226.00
Mandor L.04 OH 0.0008 148,400.00 118.72
JUMLAH TENAGA KERJA 23,209.72
B BAHAN
Engsel pintu Bh 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 23,209.72
E Overhead & profit 0% x Jumlah #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
JENIS PEKERJAAN : A.4.6.2.9 Pemasangan 1 buah kait angin
SATUAN : Bh
HARGA SATUAN : #REF!

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 96,000.00 1,440.00
Tukang Kayu L.02 OH 0.1500 129,500.00 19,425.00
Kepala Tukang L.03 OH 0.0150 148,400.00 2,226.00
Mandor L.04 OH 0.0080 148,400.00 1,187.20
JUMLAH TENAGA KERJA 24,278.20
B BAHAN
Kait angin Bh 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) #REF!
E Overhead & profit 10% x Jumlah #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

JENIS PEKERJAAN : A.4.6.2.15Pemasangan 1 m2 kaca tebal 3 mm


SATUAN : M2
HARGA SATUAN : #REF!

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 96,000.00 1,440.00
Tukang Kayu L.02 OH 0.1500 129,500.00 19,425.00
Kepala Tukang L.03 OH 0.0150 148,400.00 2,226.00
Mandor L.04 OH 0.0008 148,400.00 118.72
JUMLAH TENAGA KERJA 23,209.72
B BAHAN
Kaca tebal 3 mm M2 1.1000 #REF! #REF!
Sealant Kg 0.0500 8,000.00 400.00
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) #REF!
E Overhead & profit 10% x Jumlah #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

JENIS PEKERJAAN : 1 M2 MEMASANG RUMPUT LEMPENG


SATUAN : M2
HARGA SATUAN : Rp 42,442

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 96,000.00 9,600.00
Mandor L.04 OH 0.0100 148,400.00 1,484.00
JUMLAH TENAGA KERJA 11,084.00
B BAHAN
Rumput Lempeng M2 1.1000 25,000.00 27,500.00

JUMLAH HARGA BAHAN 27,500.00


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 38,584.00
E Overhead & profit 10% x Jumlah 3,858.40
F Harga Satuan Pekerjaan (D+E) 42,442.40
HARGA SATUAN PEKERJAAN PENGECATAN
JENIS PEKERJAAN : A.4.7.1.8 Peleburan 1 m2 bidang kayu dengan cat residu atau ter
SATUAN : M2
HARGA SATUAN : Rp 22,743

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 96,000.00 9,600.00
Mandor L.04 OH 0.0060 148,400.00 890.40
JUMLAH TENAGA KERJA 10,490.40
B BAHAN
Residu atau ter L 0.3500 29,100.00 10,185.00
JUMLAH HARGA BAHAN 10,185.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 20,675.40
E Overhead & profit 10% x Jumlah 2,067.54
F Harga Satuan Pekerjaan (D+E) 22,742.94

JENIS PEKERJAAN : A.4.7.1.5 Pengecatan cat menie kayu yang menyentuh pasangan (2 lapis cat menie)
SATUAN : M2
HARGA SATUAN : Rp 30,180

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.070 96,000.00 6,720.00
Tukang Cat L.02 OH 0.105 129,500.00 13,597.50
Kepala Tukang L.03 OH 0.004 148,400.00 593.60
Mandor L.04 OH 0.003 148,400.00 445.20
JUMLAH TENAGA KERJA 21,356.30
B BAHAN
Cat menie Kg 0.200 30,400.00 6,080.00
JUMLAH HARGA BAHAN 6,080.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 27,436.30
E Overhead & profit 10% x Jumlah 2,743.63
F Harga Satuan Pekerjaan (D+E) 30,179.93

JENIS PEKERJAAN : A.4.7.1.5 Pengecatan bidang kayu baru (1lapis plamuur, 1 lapis cat dasar,3 lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 65,648

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0700 96,000.00 6,720.00
Tukang Cat L.02 OH 0.1050 129,500.00 13,597.50
Kepala Tukang L.03 OH 0.0040 148,400.00 593.60
Mandor L.04 OH 0.0030 148,400.00 445.20
JUMLAH TENAGA KERJA 21,356.30
B BAHAN
Cat menie Kg 0.2000 30,400.00 6,080.00
Plamuur Kg 0.1500 31,600.00 4,740.00
Cat dasar Kg 0.1700 41,600.00 7,072.00
Cat penutup Kg 0.3500 52,400.00 18,340.00
Kuas Bh 0.0100 18,300.00 183.00
Pengencer Kg 0.0300 14,300.00 429.00
Ampelas Lbr 0.2000 7,400.00 1,480.00
JUMLAH HARGA BAHAN 38,324.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 59,680.30
E Overhead & profit 10% x Jumlah 5,968.03
F Harga Satuan Pekerjaan (D+E) 65,648.33
JENIS PEKERJAAN : A.4.7.1.10Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 28,986

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.0200 96,000.00 1,920.00
Tukang Cat L.02 OH 0.0630 129,500.00 8,158.50
Kepala Tukang L.03 OH 0.0063 148,400.00 934.92
Mandor L.04 OH 0.0030 148,400.00 445.20
JUMLAH TENAGA KERJA 11,458.62
B BAHAN
Plamuur Kg 0.1000 24,900.00 2,490.00
Cat dasar Kg 0.1000 41,600.00 4,160.00
Cat penutup Kg 0.2600 31,700.00 8,242.00
JUMLAH HARGA BAHAN 14,892.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 26,350.62
E Overhead & profit 10% x Jumlah 2,635.06
F Harga Satuan Pekerjaan (D+E) 28,985.68

JENIS PEKERJAAN : A.4.7.1.10Pengecatan 1 m2 Kanstin


SATUAN : M2
HARGA SATUAN : Rp 32,464

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.070 96,000.00 6,720.00
Tukang Cat L.02 OH 0.075 129,500.00 9,712.50
Kepala Tukang L.03 OH 0.008 148,400.00 1,113.00
Mandor L.04 OH 0.003 148,400.00 371.00
JUMLAH TENAGA KERJA 17,916.50
B BAHAN
Cat Kg 0.260 44,600.00 11,596.00

JUMLAH HARGA BAHAN 11,596.00


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 29,512.50
E Overhead & profit 10% x Jumlah 2,951.25
F Harga Satuan Pekerjaan (D+E) 32,463.75

Padang, Juli 2019

Dibuat Oleh
Kontraktor Pelaksana
CV. KORREFT ANDALAS 1998

GUSMAR TANJUNG
Direktur
DAFTAR HARGA DASAR SATUAN UPAH
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
KEGIATAN : PROGRAM PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : REHAB SALURAN BELAKANG REKTORAT UNIVERSITAS ANDALAS
LOKASI : KAMPUS UNIVERSITAS ANDALAS - LIMAU MANIS, PADANG
TAHUN ANGGARAN : 2019

HARGA HARGA
No. URAIAN KODE KETERANGAN SATUAN PERJAM SATUAN PERHARI
( Rp.) ( Rp.)

1 Pekerja L01 Rp 13,714.29 96,000.00


Upah dihitung
2 Tukang L02 dengan jumlah Rp 18,500.00 129,500.00
3 Kepala Tukang L03 hari kerja di Rp 21,200.00 148,400.00
4 Mandor L04 asumsikan 25 hari Rp 21,200.00 148,400.00
5 Juru ukur L05 dalam sebulan. Rp 27,700.00 193,900.00
6 Pembantu juru ukur L06 Jam kerja efektif Rp 18,500.00 129,500.00
7 Penjaga malam L19 diasumsikan 7 jam Rp 18,500.00 129,500.00
sehari.
8 Juru Ukur/Drafter Cad/Estimator (D3) Rp 27,700.00 193,900.00

Padang, Juli 2019

Dibuat Oleh
Kontraktor Pelaksana
CV. KORREFT ANDALAS 1998

GUSMAR TANJUNG
Direktur
DAFTAR HARGA DASAR SATUAN BAHAN

PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS


KEGIATAN : PROGRAM PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : REHAB SALURAN BELAKANG REKTORAT UNIVERSITAS ANDALAS
LOKASI : KAMPUS UNIVERSITAS ANDALAS - LIMAU MANIS, PADANG
TAHUN ANGGARAN : 2019

HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

A. KELOMPOK AIR, TANAH, BATU DAN SEMEN


1 Air M.02 M3 Rp 18,000.00
2 Pasir Pasang (Sedang) M01b M3 Rp 159,500.00 Base Camp
3 Pasir Beton (Kasar) M01a M3 Rp 159,500.00 Base Camp
4 Pasir Urug M44 M3 Rp 110,400.00 Base Camp
5 Batu kali M02 M3 Rp 170,400.00
6 Batu Belah M06 M3 Rp 162,400.00 Lokasi Pekerjaan
7 Batu Pecah 5/10 M3 Rp 293,700.00
8 Bahan Tanah Timbunan M08 M3 Rp 125,000.00 Borrow Pit/quarry
9 Sirtu M16 M3 Rp 139,300.00
10 Kerikil/agregat Beton M.06 M3 Rp 145,000.00
11 Batu bata / merah bakar biasa M.04.c Bh Rp 800.00
12 Semen / PC (50kg) M12 Zak Rp 60,100.00 Base Camp
13 Semen / PC (kg) M12 Kg Rp 1,202.00 Base Camp
14 Semen Warna (Tepung Alfa) M.15b Kg Rp 10,700.00
15 Glass Block Bh Rp 17,500.00

C. KELOMPOK BAHAN KAYU


1 Dolken kayu galam dia 8-10 cm, pjg 4 m (Perancah) Btg Rp 34,100.00
2 Kayu Banio ( Papan ) Klas I M3 Rp 4,026,600.00
3 Kayu Banio ( Balok) Klas I M3 Rp 4,035,700.00
4 Kayu Timbalun ( Balok) Klas I M3 Rp 3,707,500.00
5 Kayu Marsawa ( Papan ) Klas II M3 Rp 3,105,800.00
6 Kayu Marsawa ( Balok ) Klas II M3 Rp 3,029,100.00
7 Kayu Merantih ( Papan ) Klas III M3 Rp 2,582,700.00
8 Kayu Merantih ( Balok ) Klas III M3 Rp 2,426,600.00
9 Kayu Bekisting ( Balok ) Klas IV M3 Rp 1,962,100.00
10 Multiplek tebal 9 mm Lbr Rp 124,900.00
11 Plywood 4 mm Lbr Rp 83,700.00
12 Plywood 9 mm Lbr Rp 144,600.00
13 Triflex t= 3 mm Lbr Rp 52,100.00
14 Triflex t= 4 mm Lbr Rp 65,300.00
15 Triflex t= 6 mm Lbr Rp 87,800.00
16 Les Profil (3x3.5x400) M1 Rp 15,300.00
17 Les kaca (1x3x400) M1 Rp 12,000.00
18 Lem kayu Kg Rp 16,700.00
19 Jendela naco ( 15 x 90 ) cm + Rangka Bh Rp 194,900.00
20 GRC t= 4mm Lbr Rp 67,500.00

D. KELOMPOK BAHAN LOGAM


1 Besi setrip Kg Rp 12,100.00
2 Baja profil INP Kg Rp 19,500.00
3 Besi Beton Polos M13 Kg Rp 10,300.00
4 Besi Beton Ulir M13 Kg Rp 10,800.00
5 Kawat Beton / Bendrat M14 Kg Rp 19,100.00
6 Kawat las lisrik Kg Rp 46,400.00
7 Kawat las lisrik M51 Dos Rp 151,600.00
8 Paku biasa 1 cm - 4 cm M18 Kg Rp 17,800.00
9 Paku biasa 5 cm - 7 cm Kg Rp 16,900.00
10 Paku pjg 10 cm - 12 cm Kg Rp 17,000.00
11 Paku seng gelombang Kg Rp 27,000.00
12 Paku Atap Genteng 1/2"-1" Kg Rp 20,000.00
13 Profil alluminium M1 Rp 110,000.00
14 Pintu Alluminium M1 Rp 350,000.00
15 Jendela Alluminium M1 Rp 150,000.00
16 Alluminium strip M1 Rp 35,000.00
17 Skrup fixer Bh Rp 7,500.00
18 Sealant (Lem Silicont) Tube Rp 8,000.00
19 Profil kaca M1 Rp 45,500.00
20 Wiremesh untuk pelat Lantai Beton Kg Rp 13,100.00
21 Skrup Kg Rp 25,200.00
22 Skrup Bh Rp 150.00

E. KELOMPOK BAHAN ATAP


Atap Seng
1 - Seng BJLS 0.30 x 3' x 6' bd 9 Lbr Rp 55,200.00

Atap Seng Warna :


1 - Tebal 0.20 11 bd merk Swan Brand/Gjh. Berlian Lbr Rp 108,200.00
2 - Genteng Metal ( Polycolor ) 0.30 cm Lbr Rp 57,500.00

Perabung Atap Seng


1 - Seng Plat BJLS 30 Lbr Rp 66,400.00
2 - Seng Plat BJLS 20 Warna Lbr Rp 66,700.00
2 - Perabung Genteng metal Lbr Rp 30,500.00
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
Atap Zincalume
1 - Atap Zincalume Tebal 0,35 Bmt M2 Rp 76,500.00

H. ASPAL, BAHAN BAKAR, MINYAK, DAN CAT


1 Premium non subsidi / Pertalite M20 Ltr Rp 7,900.00 Pertamina
2 Solar non subsidi / Dexlite M21 Ltr Rp 7,200.00 Pertamina
3 Minyak Pelumas / Olie M22 Ltr Rp 35,000.00 Pertamina
4 Cat Minyak M42 Kg Rp 52,400.00
5 Plemer Kayu Kg Rp 31,600.00
6 Plemer Tembok Kg Rp 24,900.00
7 Meni kayu - warna Kg Rp 30,400.00
8 Meni besi - warna Kg Rp 37,200.00
9 Cat tembok catilax Kg Rp 31,700.00
10 Residu Ltr Rp 29,100.00
11 Minyak Cat Ltr Rp 14,300.00
12 Amplas Lbr Rp 7,400.00
13 Cat Dasar TL Kg Rp 41,600.00
14 Minyak bekisting Ltr Rp 13,800.00
15 Kuas Bh Rp 18,300.00
16 Aqua Proof Kg Rp 58,200.00
17 Sealtape Bh Rp 10,000.00
18 Water Proffing Membrane M1 Rp 55,500.00
19 Primer Water Proffing Kg Rp 1,160.00
20 Sewa Scafolding Rp 45,000.00
21 Jack Base Rp 25,000.00
22 Cat Walk Rp 15,000.00
23 Sewa Alat Jam Rp 25,000.00

J. KELOMPOK BAHAN PIPA


Pipa GIP SNI 0039-2010 Klas Medium
- Diameter 50 mm M' Rp 115,600.00
- Diameter 75 mm M' Rp 190,600.00

Pipa PVC AW
- Diameter 4 " M' Rp 54,800.00
- Diameter 3 " M' Rp 35,200.00
- Diameter 2 1/2 " M' Rp 26,400.00
- Diameter 2 " M' Rp 19,800.00
- Diameter 1 1/2" M' Rp 15,700.00
- Diameter 1 " M' Rp 10,300.00
- Diameter 3/4 " M' Rp 9,200.00
- Diameter 1/2 " M' Rp 7,300.00

Padang, Juli 2019

Dibuat Oleh
Kontraktor Pelaksana
CV. KORREFT ANDALAS 1998

GUSMAR TANJUNG
Direktur
DAFTAR BIAYA SEWA PERALATAN PER-JAM KERJA

SEWA ALAT/JAM
No. URAIAN KODE HP KAP. KET.
(di luarPPN)

1 STAMPER E25 4.7 121.00 Ton Rp 52,903.82


2

Padang, Juli 2019

Dibuat Oleh
Kontraktor Pelaksana
CV. KORREFT ANDALAS 1998

GUSMAR TANJUNG
Direktur
TIME SCHEDULLE
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
KEGIATAN : PROGRAM PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : REHAB SALURAN BELAKANG REKTORAT UNIVERSITAS ANDALAS
LOKASI : KAMPUS UNIVERSITAS ANDALAS - LIMAU MANIS, PADANG
TAHUN ANGGARAN : 2019

BULAN I
No URAIAN PEKERJAAN BOBOT MINGGU KET
1 2 3 4 5 6 7
100
A PEKERJAAN PEMBERSIHAN SALURAN
I PEKERJAAN PERSIAPAN 2.42 1.21 1.21
II PEKERJAAN SALURAN 9.17 3.06 3.06 3.06
B PEKERJAAN SALURAN TYPE 1
I PEKERJAAN PERSIAPAN 5.47 1.82 1.82 1.82
II PEKERJAAN SALURAN 44.27 8.85 8.85 8.85 8.85 8.85
C PEKERJAAN SALURAN TYPE 2
I PEKERJAAN PERSIAPAN 7.20 2.40 2.40 2.40
II PEKERJAAN SALURAN 31.46 7.87 7.87 7.87 7.87

BOBOT RENCANA / MINGGU 100.00 4.27 14.95 16.13 20.94 19.12 16.72 7.87
JUMLAH BOBOT KOMULATIF 0 4.27 19.22 35.35 56.29 75.41 92.13 100.00
REALISASI BOBOT / MINGGU
JUMLAH REALISASI BOBOT
DEVIASI ( + / - )

JANGKA WAKTU PELAKSANAAN 45 ( EMPAT PULUH LIMA ) HARI KALENDER

Padang, Juli 2019

Dibuat Oleh
Kontraktor Pelaksana
CV. KORREFT ANDALAS 1998

GUSMAR TANJUNG
Direktur
TABEL KUSEN
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
KEGIATAN : PROGRAM PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : REHAB SALURAN BELAKANG REKTORAT UNIVERSITAS ANDALAS
LOKASI : KAMPUS UNIVERSITAS ANDALAS - LIMAU MANIS, PADANG
TAHUN ANGGARAN : 2019

Panjang Pintu Jendela Ventilasi Perlengkapan


No TYPE Jumlah Luas Engsel
Kaca Kunci Engsel Grendel Grendel Tangan Hak
Keliling Dalam Panil Rangka Jalusi Angker Jendel
Mati Tanam Pintu Pintu Jendela Tangan Angin
a

1 P 2 7.95 13.60 4.10 6.02 1.22 12.00 2.00 12.00 4.00

JUMLAH 7.95 13.60 4.10 6.02 0.00 0.00 1.22 12.00 2.00 12.00 4.00 0.00 0.00 0.00 0.00

Padang, Juli 2019

Dibuat Oleh
Kontraktor Pelaksana
CV. KORREFT ANDALAS 1998

GUSMAR TANJUNG
Direktur
HITUNGAN BETON
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
KEGIATAN : PROGRAM PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : REHAB SALURAN BELAKANG REKTORAT UNIVERSITAS ANDALAS
LOKASI : KAMPUS UNIVERSITAS ANDALAS - LIMAU MANIS, PADANG
TAHUN ANGGARAN : 2019

NO SKETSA HITUNGAN

1 0.2 Pas. Kolom 20 / 30


. 1 m3 = 16.67 m'
Beugel = 16.67 : 0.15 = 111.11111 ¥ 112.00 Bh
Besi Polos
Ø 12= 16.67 x 4.00 x 0.888 = 59.184
0.3 0.3 Ø 10= 16.67 x 2.00 x 0.617 = 20.550
Ø 8 = 112.00 x 0.67 x 0.395 = 29.608
109.342 ¥ 109.00 Kg
Pemakaian Bekisting :
16.67 x 1.00 = 16.6667 ¥ 16.667 m2
0.2 Pemakaian Stoot Werk :

2 Pas. Kolom Praktis 13 / 13


0.13 1 m3 = 59.17 m'
Beugel = 59.17 : 0.15 = 394.47732 ¥ 395.00 Bh
Besi Polos
Ø 12= 59.17 x 4.00 x 0.888 = 210.121
0.13 0.13 Ø 8 = 395.00 x 0.43 x 0.395 = 67.016
277.137 ¥ 277.00 Kg
Pemakaian Bekisting :
59.17 x 0.26 = 15.3846 ¥ 15.385 m2
0.13 Pemakaian Stoot Werk :

3 0.15 Pas. Sloof 15 / 20


. 1 m3 = 33.33 m'
Beugel = 33.33 : 0.15 = 222.22222 ¥ 223.00 Bh
Besi Polos
Ø 12 = 33.33 x 4.00 x 0.888 = 118.368
0.20 0.20 Ø 8 = 223.00 x 0.61 x 0.395 = 53.672
172.040 ¥ 172.00 Kg
Pemakaian Bekisting :
33.33 x 0.40 = 13.3333 ¥ 13.333 m2
Pemakaian Stoot Werk :
0.15

4 0.13 Pas. Balok Latei 13 / 20


. 1 m3 = 38.46 m'
Beugel = 38.46 : 0.15 = 256.41026 ¥ 257.00 Bh
Besi Polos
Ø10 = 38.46 x 4.00 x 0.617 = 94.846
0.20 0.20 Ø 8 = 257.00 x 0.53 x 0.395 = 53.743
148.589 ¥ 148.00 Kg
Pemakaian Bekisting :
38.46 x 0.40 = 15.3846 ¥ 15.385 m2
Pemakaian Stoot Werk :
0.13
NO SKETSA HITUNGAN

5 0.13 Pas. Ring Balok 13 / 20


1 m3 = 38.46 m'
Beugel = 38.46 : 0.15 = 256.41026 ¥ 257.00 Bh
Besi Polos
Ø 12= 38.46 x 4.00 x 0.888 = 136.578
0.20 0.20 Ø 8 = 257.00 x 0.53 x 0.395 = 53.743
190.321 ¥ 190.00 Kg
Pemakaian Bekisting :
38.46 x 0.40 = 15.3846 ¥ 15.385 m2
Pemakaian Stoot Werk :
0.13

6 Pas. Plat Beton T 10 cm


Tulangan 1 Lapis
Tebal Plat 10 cm
1 m3 = 10.00 m'
Besi = 10.00 : 0.15 = 66.666667 ¥ 67.00 Ps

Besi Polos
Ø 10= 67.00 x 2.00 x 0.617 = 82.611
82.611 ¥ 82.00 Kg
Pemakaian Bekisting :
= 10.0000 ¥ 10.000 m2
Pemakaian Stoot Werk :
10.00 x 4.00 x 0.01 = 0.5040 ¥ 0.504 m3

Padang, Juli 2019

Dibuat Oleh
Kontraktor Pelaksana
CV. KORREFT ANDALAS 1998

GUSMAR TANJUNG
Direktur
PROGRAM TERBILANG

Masukkan nil
Bilangan 159,930,000.00 dimaksud (ak
Trilyun dalam huruf)

Ratus Milyar
Puluhan Milyar
Ratus Juta
Puluhan Juta
- Rupiah - Sen Ratus Ribu
1 Satu 10.00 Sepuluh 0.01 Satu Puluhan Ribu
2 Dua 20.00 Dua Puluh 0.01 Satu Ratusan
3 Tiga 30.00 Tiga Puluh 0.01 Satu Puluhan
4 Empat 40.00 Empat Pulu 0.01 Satu Rupiah
5 Lima 50.00 Lima Puluh 0.01 Satu Sen
6 Enam 60.00 Enam Pulu 0.02 Dua
7 Tujuh 70.00 Tujuh Puluh 0.02 Dua
8 Delapan 80.00 Delapan Pu 0.02 Dua Cek Bilangan
9 Sembilan 90.00 Sembilan P 0.02 Dua Terbilang:
Hasil (akan keluar otomatis).
10 Sepuluh 100.00 Seratus 0.02 Dua Seratus Lima Puluh Sembilan Juta Sembila
11 Sebelas 200.00 Dua Ratus 0.02 Dua
12 Dua Belas 300.00 Tiga Ratus 0.02 Dua
13 Tiga Belas 400.00 Empat Ratu 0.02 Dua
14 Empat Bela 500.00 Lima Ratus 0.02 Dua
15 Lima Belas 600.00 Enam Ratu 0.02 Dua
16 Enam Bela 700.00 Tujuh Ratu 0.03 Tiga
17 Tujuh Bela 800.00 Delapan Ra 0.03 Tiga
18 Delapan Be 900.00 Sembilan R 0.03 Tiga
19 Sembilan B 1,000.00 Seribu 0.03 Tiga
20 Dua Puluh 2,000.00 Dua Ribu 0.03 Tiga
21 Dua Puluh 3,000.00 Tiga Ribu 0.03 Tiga
22 Dua Puluh 4,000.00 Empat Ribu 0.03 Tiga
23 Dua Puluh 5,000.00 Lima Ribu 0.03 Tiga
24 Dua Puluh 6,000.00 Enam Ribu 0.03 Tiga
25 Dua Puluh 7,000.00 Tujuh Ribu 0.03 Tiga
26 Dua Puluh 8,000.00 Delapan Ri 0.04 Empat
27 Dua Puluh 9,000.00 Sembilan R 0.04 Empat
28 Dua Puluh ### Sepuluh Ri 0.04 Empat
29 Dua Puluh ### Sebelas Ri 0.04 Empat
30 Tiga Puluh ### Dua Belas 0.04 Empat
31 Tiga Puluh ### Tiga Belas 0.04 Empat
32 Tiga Puluh ### Empat Bela 0.04 Empat
33 Tiga Puluh ### Lima Belas 0.04 Empat
34 Tiga Puluh ### Enam Belas 0.04 Empat
35 Tiga Puluh ### Tujuh Belas 0.04 Empat
36 Tiga Puluh ### Delapan Be 0.05 Lima
37 Tiga Puluh ### Sembilan B 0.05 Lima
38 Tiga Puluh ### Dua Puluh 0.05 Lima
39 Tiga Puluh ### Dua Puluh 0.05 Lima
40 Empat Pul ### Dua Puluh 0.05 Lima
41 Empat Pulu ### Dua Puluh 0.05 Lima
42 Empat Pul ### Dua Puluh 0.05 Lima
43 Empat Pulu ### Dua Puluh 0.05 Lima
44 Empat Pul ### Dua Puluh 0.05 Lima
45 Empat Pulu ### Dua Puluh 0.05 Lima
46 Empat Pul ### Dua Puluh 0.06 Enam
47 Empat Pulu ### Dua Puluh 0.06 Enam
48 Empat Pulu ### Tiga Puluh 0.06 Enam
49 Empat Pulu ### Tiga Puluh 0.06 Enam
50 Lima Puluh ### Tiga Puluh 0.06 Enam
51 Lima Puluh ### Tiga Puluh 0.06 Enam
52 Lima Puluh ### Tiga Puluh 0.06 Enam
53 Lima Puluh ### Tiga Puluh 0.06 Enam
54 Lima Puluh ### Tiga Puluh 0.06 Enam
55 Lima Puluh ### Tiga Puluh 0.06 Enam
56 Lima Pulu ### Tiga Puluh 0.07 Tujuh
57 Lima Puluh ### Tiga Puluh 0.07 Tujuh
58 Lima Puluh ### Empat Pulu 0.07 Tujuh
59 Lima Puluh ### Empat Pulu 0.07 Tujuh
60 Enam Pulu ### Empat Pulu 0.07 Tujuh
61 Enam Pulu ### Empat Pulu 0.07 Tujuh
62 Enam Pulu ### Empat Pulu 0.07 Tujuh
63 Enam Puluh ### Empat Pulu 0.07 Tujuh
64 Enam Pulu ### Empat Pulu 0.07 Tujuh
65 Enam Pulu ### Empat Pulu 0.07 Tujuh
66 Enam Pulu ### Empat Pulu 0.08 Delapan
67 Enam Puluh ### Empat Pulu 0.08 Delapan
68 Enam Pulu ### Lima Puluh 0.08 Delapan
69 Enam Pulu ### Lima Puluh 0.08 Delapan
70 Tujuh Pulu ### Lima Puluh 0.08 Delapan
71 Tujuh Pulu ### Lima Puluh 0.08 Delapan
72 Tujuh Pulu ### Lima Puluh 0.08 Delapan
73 Tujuh Pulu ### Lima Puluh 0.08 Delapan
74 Tujuh Pulu ### Lima Puluh 0.08 Delapan
75 Tujuh Pulu ### Lima Puluh 0.08 Delapan
76 Tujuh Pulu ### Lima Puluh 0.09 Sembilan
77 Tujuh Pulu ### Lima Puluh 0.09 Sembilan
78 Tujuh Pulu ### Enam Puluh 0.09 Sembilan
79 Tujuh Pulu ### Enam Puluh 0.09 Sembilan
80 Delapan Pu ### Enam Puluh 0.09 Sembilan
81 Delapan Pu ### Enam Puluh 0.09 Sembilan
82 Delapan Pu ### Enam Puluh 0.09 Sembilan
83 Delapan Pu ### Enam Puluh 0.09 Sembilan
84 Delapan Pu ### Enam Pulu 0.09 Sembilan
85 Delapan Pu ### Enam Puluh 0.09 Sembilan
86 Delapan P ### Enam Puluh 0.10 Sepuluh
87 Delapan Pu ### Enam Puluh 0.10 Sepuluh
88 Delapan Pu ### Tujuh Puluh 0.10 Sepuluh
89 Delapan Pu ### Tujuh Pulu 0.10 Sepuluh
90 Sembilan P ### Tujuh Pulu 0.10 Sepuluh
91 Sembilan P ### Tujuh Puluh 0.10 Sepuluh
92 Sembilan P ### Tujuh Pulu 0.10 Sepuluh
93 Sembilan P ### Tujuh Pulu 0.10 Sepuluh
94 Sembilan P ### Tujuh Pulu 0.10 Sepuluh
95 Sembilan P ### Tujuh Puluh 0.10 Sepuluh
96 Sembilan ### Tujuh Pulu 0.11 Sebelas
97 Sembilan P ### Tujuh Pulu 0.11 Sebelas
98 Sembilan P ### Delapan Pu 0.11 Sebelas
99 Sembilan P ### Delapan Pu 0.11 Sebelas
### Delapan Pu 0.11 Sebelas
### Delapan Pu 0.11 Sebelas
### Delapan Pu 0.11 Sebelas
### Delapan Pu 0.11 Sebelas
### Delapan Pu 0.11 Sebelas
### Delapan Pu 0.11 Sebelas
### Delapan Pu 0.12 Dua Belas
### Delapan Pu 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.13 Tiga Belas
### Sembilan P 0.13 Tiga Belas
### Seratus 0.13 Tiga Belas
### Dua Ratus 0.13 Tiga Belas
### Tiga Ratus 0.13 Tiga Belas
### Empat Ratu 0.13 Tiga Belas
### Lima Ratus 0.13 Tiga Belas
### Enam Ratu 0.13 Tiga Belas
### Tujuh Ratu 0.13 Tiga Belas
### Delapan Ra 0.13 Tiga Belas
### Sembilan R 0.14 Empat Belas
### Satu Juta 0.14 Empat Belas
### Dua Juta 0.14 Empat Belas
### Tiga Juta 0.14 Empat Belas
### Empat Juta 0.14 Empat Belas
### Lima Juta 0.14 Empat Belas
### Enam Juta 0.14 Empat Belas
### Tujuh Juta 0.14 Empat Belas
### Delapan Ju 0.14 Empat Belas
### Sembilan J 0.14 Empat Belas
### Sepuluh Ju 0.15 Lima Belas
### Sebelas Ju 0.15 Lima Belas
### Dua Belas 0.15 Lima Belas
### Tiga Belas 0.15 Lima Belas
### Empat Bela 0.15 Lima Belas
### Lima Belas 0.15 Lima Belas
### Enam Belas 0.15 Lima Belas
### Tujuh Belas 0.15 Lima Belas
### Delapan Be 0.15 Lima Belas
### Sembilan B 0.15 Lima Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh T 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Tujuh Puluh 0.21 Dua Puluh Satu
### Tujuh Puluh 0.21 Dua Puluh Satu
### Tujuh Pulu 0.21 Dua Puluh Satu
### Tujuh Puluh 0.21 Dua Puluh Satu
### Tujuh Pulu 0.21 Dua Puluh Satu
### Tujuh Puluh 0.21 Dua Puluh Satu
### Tujuh Pulu 0.21 Dua Puluh Satu
### Tujuh Puluh 0.21 Dua Puluh Satu
### Tujuh Pulu 0.21 Dua Puluh Satu
### Tujuh Pulu 0.21 Dua Puluh Satu
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan Pu 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Seratus 0.24 Dua Puluh Empat
### Dua Ratus 0.24 Dua Puluh Empat
### Tiga Ratus 0.24 Dua Puluh Empat
### Empat Ratu 0.24 Dua Puluh Empat
### Lima Ratus 0.24 Dua Puluh Empat
### Enam Ratu 0.24 Dua Puluh Empat
### Tujuh Ratu 0.24 Dua Puluh Empat
### Delapan Ra 0.24 Dua Puluh Empat
### Sembilan R 0.24 Dua Puluh Empat
### Satu Milyar 0.24 Dua Puluh Empat
### Dua Milyar 0.25 Dua Puluh Lima
### Tiga Milyar 0.25 Dua Puluh Lima
### Empat Mily 0.25 Dua Puluh Lima
### Lima Milyar 0.25 Dua Puluh Lima
### Enam Milya 0.25 Dua Puluh Lima
### Tujuh Milya 0.25 Dua Puluh Lima
### Delapan Mil 0.25 Dua Puluh Lima
### Sembilan Mi 0.25 Dua Puluh Lima
### Sepuluh Mil 0.25 Dua Puluh Lima
### Sebelas Mil 0.25 Dua Puluh Lima
### Dua Belas M 0.26 Dua Puluh Enam
### Tiga Belas 0.26 Dua Puluh Enam
### Empat Bela 0.26 Dua Puluh Enam
### Lima Belas 0.26 Dua Puluh Enam
### Enam Belas 0.26 Dua Puluh Enam
### Tujuh Belas 0.26 Dua Puluh Enam
### Delapan Bel 0.26 Dua Puluh Enam
### Sembilan Be 0.26 Dua Puluh Enam
### Dua Puluh M 0.26 Dua Puluh Enam
### Dua Puluh S 0.26 Dua Puluh Enam
### Dua Puluh 0.27 Dua Puluh Tujuh
### Dua Puluh T 0.27 Dua Puluh Tujuh
### Dua Puluh 0.27 Dua Puluh Tujuh
### Dua Puluh 0.27 Dua Puluh Tujuh
### Dua Puluh 0.27 Dua Puluh Tujuh
### Dua Puluh T 0.27 Dua Puluh Tujuh
### Dua Puluh 0.27 Dua Puluh Tujuh
### Dua Puluh 0.27 Dua Puluh Tujuh
### Tiga Puluh 0.27 Dua Puluh Tujuh
### Tiga Puluh 0.27 Dua Puluh Tujuh
### Tiga Puluh 0.28 Dua Puluh Delapan
### Tiga Puluh 0.28 Dua Puluh Delapan
### Tiga Puluh 0.28 Dua Puluh Delapan
### Tiga Puluh 0.28 Dua Puluh Delapan
### Tiga Puluh 0.28 Dua Puluh Delapan
### Tiga Puluh 0.28 Dua Puluh Delapan
### Tiga Puluh 0.28 Dua Puluh Delapan
### Tiga Puluh 0.28 Dua Puluh Delapan
### Empat Pulu 0.28 Dua Puluh Delapan
### Empat Pulu 0.28 Dua Puluh Delapan
### Empat Pulu 0.29 Dua Puluh Sembilan
### Empat Puluh 0.29 Dua Puluh Sembilan
### Empat Pulu 0.29 Dua Puluh Sembilan
### Empat Pulu 0.29 Dua Puluh Sembilan
### Empat Pulu 0.29 Dua Puluh Sembilan
### Empat Pulu 0.29 Dua Puluh Sembilan
### Empat Pulu 0.29 Dua Puluh Sembilan
### Empat Pulu 0.29 Dua Puluh Sembilan
### Lima Puluh 0.29 Dua Puluh Sembilan
### Lima Puluh 0.29 Dua Puluh Sembilan
### Lima Puluh 0.30 Tiga Puluh
### Lima Puluh 0.30 Tiga Puluh
### Lima Puluh 0.30 Tiga Puluh
### Lima Puluh 0.30 Tiga Puluh
### Lima Puluh 0.30 Tiga Puluh
### Lima Puluh 0.30 Tiga Puluh
### Lima Puluh 0.30 Tiga Puluh
### Lima Puluh 0.30 Tiga Puluh
### Enam Puluh 0.30 Tiga Puluh
### Enam Puluh 0.30 Tiga Puluh
### Enam Puluh 0.31 Tiga Puluh Satu
### Enam Puluh 0.31 Tiga Puluh Satu
### Enam Puluh 0.31 Tiga Puluh Satu
### Enam Puluh 0.31 Tiga Puluh Satu
### Enam Puluh 0.31 Tiga Puluh Satu
### Enam Puluh 0.31 Tiga Puluh Satu
### Enam Puluh 0.31 Tiga Puluh Satu
### Enam Puluh 0.31 Tiga Puluh Satu
### Tujuh Puluh 0.31 Tiga Puluh Satu
### Tujuh Puluh 0.31 Tiga Puluh Satu
### Tujuh Puluh 0.32 Tiga Puluh Dua
### Tujuh Puluh 0.32 Tiga Puluh Dua
### Tujuh Pulu 0.32 Tiga Puluh Dua
### Tujuh Puluh 0.32 Tiga Puluh Dua
### Tujuh Pulu 0.32 Tiga Puluh Dua
### Tujuh Puluh 0.32 Tiga Puluh Dua
### Tujuh Puluh 0.32 Tiga Puluh Dua
### Tujuh Puluh 0.32 Tiga Puluh Dua
### Delapan Pul 0.32 Tiga Puluh Dua
### Delapan Pu 0.32 Tiga Puluh Dua
### Delapan Pu 0.33 Tiga Puluh Tiga
### Delapan Pul 0.33 Tiga Puluh Tiga
### Delapan Pu 0.33 Tiga Puluh Tiga
### Delapan Pu 0.33 Tiga Puluh Tiga
### Delapan Pu 0.33 Tiga Puluh Tiga
### Delapan Pul 0.33 Tiga Puluh Tiga
### Delapan Pu 0.33 Tiga Puluh Tiga
### Delapan Pu 0.33 Tiga Puluh Tiga
### Sembilan Pu 0.33 Tiga Puluh Tiga
### Sembilan Pu 0.33 Tiga Puluh Tiga
### Sembilan P 0.34 Tiga Puluh Empat
### Sembilan Pu 0.34 Tiga Puluh Empat
### Sembilan P 0.34 Tiga Puluh Empat
### Sembilan P 0.34 Tiga Puluh Empat
### Sembilan P 0.34 Tiga Puluh Empat
### Sembilan Pu 0.34 Tiga Puluh Empat
### Sembilan P 0.34 Tiga Puluh Empat
### Sembilan P 0.34 Tiga Puluh Empat
### Seratus 0.34 Tiga Puluh Empat
### Dua Ratus 0.34 Tiga Puluh Empat
### Tiga Ratus 0.35 Tiga Puluh Lima
### Empat Ratu 0.35 Tiga Puluh Lima
### Lima Ratus 0.35 Tiga Puluh Lima
### Enam Ratu 0.35 Tiga Puluh Lima
### Tujuh Ratu 0.35 Tiga Puluh Lima
### Delapan Ra 0.35 Tiga Puluh Lima
### Sembilan R 0.35 Tiga Puluh Lima
### Satu Trilyu 0.35 Tiga Puluh Lima
### Dua Trilyun 0.35 Tiga Puluh Lima
### Tiga Trilyun 0.35 Tiga Puluh Lima
### Empat Trily 0.36 Tiga Puluh Enam
### Lima Trilyu 0.36 Tiga Puluh Enam
### Enam Trily 0.36 Tiga Puluh Enam
### Tujuh Trily 0.36 Tiga Puluh Enam
### Delapan Tri 0.36 Tiga Puluh Enam
### Sembilan Tr 0.36 Tiga Puluh Enam
### Sepuluh Tri 0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
AM TERBILANG PROGRAM TERBILANG PROGRAM TE

Masukkan nilai angka yang Masukkan nilai angka yang


dimaksud (akan diterjemahkan Bilangan 1,173,700,000.00
dimaksud (akan diterjemahkan Bilangan
dalam huruf)
- Trilyun dalam huruf) - Trilyun
- Ratus Milyar - Ratus Milyar
- Puluhan Milyar ### Satu Milyar Puluhan Milyar
### Seratus Ratus Juta ### Seratus Ratus Juta
### Lima Puluh Sembilan JPuluhan Juta ### Tujuh Puluh Tiga Juta Puluhan Juta
### Sembilan Ratus Ratus Ribu ### Tujuh Ratus Ratus Ribu
### Tiga Puluh Ribu Puluhan Ribu - ribu Puluhan Ribu
- Ratusan - Ratusan
- Puluhan - Puluhan
- Rupiah Rupiah - Rupiah Rupiah
- Sen - Sen
- -

### ok! Cek Bilangan ### ok!


Terbilang: Terbilang:
(akan keluar otomatis). Hasil (akan keluar otomatis). Hasil (akan keluar otom
h Sembilan Juta Sembilan Ratus Tiga PuluhSatu Milyar Seratus Tujuh Puluh Tiga Juta Tujuh Ratus ribu RTiga Puluh Enam Juta S
PROGRAM TERBILANG PROGRAM TERBILANG PROGRAM T

Masukkan nilai angka yang Masukkan nilai angka yang


### (akan diterjemahkan
dimaksud Bilangan ### (akan diterjemahkan
dimaksud Bilangan
dalam huruf) - Trilyun dalam huruf) - Trilyun
Ratus Milyar - Ratus Milyar - Ratus Milyar
Puluhan Milyar - Puluhan Milyar - Puluhan Milyar
Ratus Juta - Ratus Juta - Ratus Juta
Puluhan Juta ### Tiga Puluh Enam Juta Puluhan Juta ### Lima Puluh Lima Juta Puluhan Juta
Ratus Ribu ### Sembilan Ratus Ratus Ribu ### Delapan Ratus Ratus Ribu
Puluhan Ribu ### Delapan Puluh Dua Ri Puluhan Ribu ### Lima Puluh Satu Ribu Puluhan Ribu
- Ratusan - Ratusan
- Puluhan - Puluhan
- Rupiah Rupiah - Rupiah Rupiah
- Sen - Sen
- -

Cek Bilan ### ok! Cek Bilan ### ok!


Terbilang: Terbilang:
Hasil (akan keluar otomatis). Hasil (akan keluar otomatis). Hasil (akan keluar ot
Tiga Puluh Enam Juta Sembilan Ratus Delapan PuluhLima Puluh Lima Juta Delapan Ratus Lima Puluh SatuEnam Puluh Tiga Juta
PROGRAM TERBILANG PROGRAM TERBILANG PROGRAM T

Masukkan nilai angka yang Masukkan nilai angka yang


### (akan diterjemahkan
dimaksud Bilangan ### (akan diterjemahkan
dimaksud Bilangan
dalam huruf) - Trilyun dalam huruf) - Trilyun
Ratus Milyar - Ratus Milyar - Ratus Milyar
Puluhan Milyar - Puluhan Milyar - Puluhan Milyar
Ratus Juta - Ratus Juta - Ratus Juta
Puluhan Juta ### Enam Puluh Tiga Juta Puluhan Juta ### Enam Puluh Lima JutaPuluhan Juta
Ratus Ribu ### Sembilan Ratus Ratus Ribu ### Dua Ratus Ratus Ribu
Puluhan Ribu ### Dua Puluh Sembilan RPuluhan Ribu ### Dua Puluh Empat RibuPuluhan Ribu
- Ratusan - Ratusan
- Puluhan - Puluhan
- Rupiah Rupiah - Rupiah Rupiah
- Sen - Sen
- -

Cek Bilan ### ok! Cek Bilan ### ok!


Terbilang: Terbilang:
Hasil (akan keluar otomatis). Hasil (akan keluar otomatis). Hasil (akan keluar ot
Enam Puluh Tiga Juta Sembilan Ratus Dua Puluh SemEnam Puluh Lima Juta Dua Ratus Dua Puluh Empat RiTujuh Puluh Juta Emp
PROGRAM TERBILANG PROGRAM TERBILANG PROGRAM T

Masukkan nilai angka yang Masukkan nilai angka yang


### (akan diterjemahkan
dimaksud Bilangan ### (akan diterjemahkan
dimaksud Bilangan
dalam huruf) - Trilyun dalam huruf) - Trilyun
Ratus Milyar - Ratus Milyar - Ratus Milyar
Puluhan Milyar - Puluhan Milyar - Puluhan Milyar
Ratus Juta - Ratus Juta - Ratus Juta
Puluhan Juta ### Tujuh Puluh Juta Puluhan Juta ### Tujuh Puluh Dua Juta Puluhan Juta
Ratus Ribu ### Empat Ratus Ratus Ribu ### Sembilan Ratus Ratus Ribu
Puluhan Ribu 2,000.00 Dua Ribu Puluhan Ribu ### Sembilan Puluh Tujuh Puluhan Ribu
- Ratusan - Ratusan
- Puluhan - Puluhan
- Rupiah Rupiah - Rupiah Rupiah
- Sen - Sen
- -

Cek Bilan ### ok! Cek Bilan ### ok!


Terbilang: Terbilang:
Hasil (akan keluar otomatis). Hasil (akan keluar otomatis). Hasil (akan keluar ot
Tujuh Puluh Juta Empat Ratus Dua Ribu Rupiah Tujuh Puluh Dua Juta Sembilan Ratus Sembilan PuluhSembilan Puluh Tiga J
PROGRAM TERBILANG PROGRAM TERBILANG

Masukkan nilai angka yang Masukkan nilai angka yang


### (akan diterjemahkan
dimaksud Bilangan ### (akan diterjemahkan
dimaksud
dalam huruf) - Trilyun dalam huruf) -
Ratus Milyar - Ratus Milyar -
Puluhan Milyar - Puluhan Milyar -
Ratus Juta - Ratus Juta ### Dua Ratus
Puluhan Juta ### Sembilan Puluh Tiga J Puluhan Juta ### Empat Belas Juta
Ratus Ribu ### Tujuh Ratus Ratus Ribu -
Puluhan Ribu ### Sembilan Puluh Enam Puluhan Ribu ### Enam Puluh Lima Ribu
- Ratusan -
- Puluhan -
- Rupiah Rupiah - Rupiah
- Sen -
- -

Cek Bilan ### ok! Cek Bilan ### ok!


Terbilang:
Hasil (akan keluar otomatis). Hasil (akan keluar otomatis).
Sembilan Puluh Tiga Juta Tujuh Ratus Sembilan PuluDua Ratus Empat Belas Juta Enam Puluh Lima Ribu Rupiah
HITUNGAN BETON
PROGRAM : PENINGKATAN PERGURUAN TINGGI UNIVERSITAS ANDALAS
KEGIATAN : PROGRAM PERGURUAN TINGGI UNIVERSITAS ANDALAS
PEKERJAAN : REHAB SALURAN BELAKANG REKTORAT UNIVERSITAS ANDALAS
LOKASI : KAMPUS UNIVERSITAS ANDALAS - LIMAU MANIS, PADANG
TAHUN ANGGARAN : 2019

NO SKETSA HITUNGAN

#REF!
Volume Pondasi 1 Bh Panjang 80 cm
1 m3 = 3.125 m'
Tumpuan = Beugel = 0.800 :
Lapangan = Beugel = 0.800 :

Besi
Ø 13 = 18.000 x 2.300 x
Ø 13 = 18.000 x 2.300 x

Berat besi per M3 =

Pemakaian Bekisting :
3.125 x 3.200 =

#REF!
Volume Balok 1 Bh Panjang 400 cm
1 m3 = 11.429 m'
Tumpuan = Beugel = 2.000 :
Lapangan = Beugel = 2.000 :

Besi
Ø 13 = 4.000 x 4.000 x
Ø8 = 2.000 x 4.000 x
Ø 10 = 42.000 x 1.100 x
Ø 10 = 28.000 x 1.100 x

Berat besi per M3 =

Pemakaian Bekisting :
11.429 x 0.700 =

#REF!
Volume Balok 1 Bh Panjang 400 cm
1 m3 = 26.667 m'
Tumpuan = Beugel = 2.000 :
Lapangan = Beugel = 2.000 :

Besi
Ø 12 = 4.000 x 4.000 x
Ø8= 42.000 x 0.700 x
Ø8= 28.000 x 0.700 x

Berat besi per M3 =

Pemakaian Bekisting :
26.667 x 0.500 =

#REF!
Volume Kolom 1 Bh Tinggi 350 cm
1 m3 = 10.000 m'
Tumpuan = Beugel = 1.750 :
Lapangan = Beugel = 1.750 :

Besi
Ø 13 = 12.000 x 3.500 x
Ø 10 = 12.000 x 1.100 x
Ø 10 = 12.000 x 1.100 x

Berat besi per M3 =

Pemakaian Bekisting :
10.000 x 1.300 =

#REF!
Volume Kolom 1 Bh Tinggi 350 cm
1 m3 = 44.444 m'
Tumpuan = Beugel = 1.750 :
Lapangan = Beugel = 1.750 :

Besi
Ø 10 = 4.000 x 3.500 x
Ø8= 12.000 x 0.500 x
Ø8= 12.000 x 0.500 x

Berat besi per M3 =

Pemakaian Bekisting :
44.444 x 0.300 =

#REF!
Volume Balok 1 Bh Panjang 400 cm
1 m3 = 20.000 m'
Tumpuan = Beugel = 2.000 :
Lapangan = Beugel = 2.000 :

Besi
Ø 12 = 6.000 x 4.000 x
Ø 10 = 28.000 x 0.800 x
Ø 10 = 28.000 x 0.800 x

Berat besi per M3 =

Pemakaian Bekisting :
20.000 x 0.700 =

#REF!
Volume Balok 1 Bh Panjang 400 cm
1 m3 = 33.333 m'
Tumpuan = Beugel = 2.000 :
Lapangan = Beugel = 2.000 :

Besi
Ø 10 = 4.000 x 4.000 x
Ø8= 28.000 x 0.600 x
Ø8= 28.000 x 0.600 x

Berat besi per M3 =

Pemakaian Bekisting :
33.333 x 0.400 =

#REF!
Volume Balok 1 Bh Panjang 400 cm
1 m3 = 44.444 m'
Tumpuan = Beugel = 2.000 :
Lapangan = Beugel = 2.000 :

Besi
Ø 10 = 4.000 x 4.000 x
Ø8= 28.000 x 0.500 x
Ø8= 28.000 x 0.500 x

Berat besi per M3 =

Pemakaian Bekisting :
44.444 x 0.300 =

#REF!
Ambil Sample 1 Bh Panel Plat Uk. 150 x 200 cm
1 m3 = 0.333 m'
x = 2.000 :
y = 1.500 :

Besi
Ø8= 11.000 x 2.000 x
Ø8= 8.000 x 1.500 x

Berat besi per M3 =

Pemakaian Bekisting :
3.000 / 0.360 =
#REF!
Ambil Sample 1 Bh Panel Plat Uk. 60 x 200 cm
1 m3 = 0.833 m'
x = 0.600 :
y = 2.000 :

Besi
Ø8= 4.000 x 0.600 x
Ø8= 11.000 x 2.000 x

Berat besi per M3 =

Pemakaian Bekisting :
1.200 / 0.120 =
BETON

HITUNGAN

= 0.256 m3

0.100 = 8 ¥ 18.00 Bh
0.100 = 8 ¥ 18.00 Bh

1.042 = 43.134
1.042 = 43.134
86.268 ¥ 90.00 Kg
336.98 Kg

10.0000 ¥ 10.000 m2

= 0.35 m3

0.100 = 20 ¥ 42.00 Bh
0.150 = 13.33333 ¥ 28.00 Bh

1.042 = 16.670
0.395 = 3.156
0.617 = 28.482
0.617 = 18.988
67.297 ¥ 70.00 Kg
192.28 Kg

8.0000 ¥ 8.000 m2

= 0.15 m3

0.100 = 20 ¥ 42.00 Bh
0.150 = 13.33333 ¥ 28.00 Bh

0.888 = 14.204
0.395 = 11.600
0.395 = 7.733
33.538 ¥ 35.00 Kg
223.58 Kg

13.3333 ¥ 13.333 m2

= 0.35 m3

0.150 = 11.66667 ¥ 12.00 Bh


0.150 = 11.66667 ¥ 12.00 Bh

1.042 = 43.759
0.617 = 8.138 0
0.617 = 8.138
60.035 ¥ 65.00 Kg
171.53 Kg

13.0000 ¥ 13.000 m2

= 0.07875 m3

0.150 = 11.66667 ¥ 12.00 Bh


0.150 = 11.66667 ¥ 12.00 Bh

0.617 = 8.631
0.395 = 2.367 861088.8
0.395 = 2.367
13.366 ¥ 15.00 Kg
169.72 Kg

13.3333 ¥ 13.333 m2

= 0.2 m3

0.150 = 13.33333 ¥ 28.00 Bh


0.150 = 13.33333 ¥ 28.00 Bh

0.888 = 21.306
0.617 = 13.810
0.617 = 13.810
48.925 ¥ 50.00 Kg
244.63 Kg

14.0000 ¥ 14.000 m2

= 0.12 m3

0.150 = 13.33333 ¥ 28.00 Bh


0.150 = 13.33333 ¥ 28.00 Bh

0.617 = 9.864
0.395 = 6.629
0.395 = 6.629
23.121 ¥ 25.00 Kg
192.68 Kg

13.3333 ¥ 13.333 m2

= 0.09 m3

0.150 = 13.33333 ¥ 28.00 Bh


0.150 = 13.33333 ¥ 28.00 Bh

0.617 = 9.864
0.395 = 5.524
0.395 = 5.524
20.912 ¥ 25.00 Kg
232.35 Kg

13.3333 ¥ 13.333 m2

= 0.36 m3

0.200 = 10 ¥ 11.00 Bh
0.200 = 7.5 ¥ 8.00 Bh

0.395 = 8.680
0.395 = 4.735
13.415 ¥ 15.00 Kg
37.26 Kg

8.3333 ¥ 8.333 m2
= 0.12 m3

0.200 = 3 ¥ 4.00 Bh
0.200 = 10 ¥ 11.00 Bh

0.395 = 0.947
0.395 = 8.680
9.627 ¥ 10.00 Kg
80.23 Kg

10.0000 ¥ 10.000 m2