B BAHAN
Kayu balok 5/7 m3
Paku 2”-3” Kg
Kayu papan 3/20 m3
C PERALATAN
D Jumlah (A+B+C)
No Uraian Satuan
B BAHAN
C PERALATAN
D Jumlah (A+B+C)
PENGURUGAN KEMBALI 1 M3 GALIAN TANAH
No Uraian Satuan
No Uraian Satuan
A TENAGA
Pekerja OH
Mandor OH
B BAHAN
C PERALATAN
D Jumlah (A+B+C)
PENGURUGAN 1 M3 DENGAN PASIR URUG
No Uraian Satuan
A TENAGA
Pekerja OH
Mandor OH
B BAHAN
Pasir urug m3
C PERALATAN
D Jumlah (A+B+C)
PEMASANGAN 1 M3 PONDASI BATU BELAH 1 : 5
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang Batu OH
Kepala Tukang OH
Mandor OH
B BAHAN
Batu belah m3
Semen Portland Kg
Pasir Pasang m3
C PERALATAN
D Jumlah (A+B+C)
PEMASANGAN 1 M3 BATU KOSONG (AANSTAMPING)
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang Batu OH
Kepala Tukang OH
Mandor OH
B BAHAN
Batu belah m3
Pasir urug m3
C PERALATAN
D Jumlah (A+B+C)
ANALISA BIAYA KONSRUKSI PEKERJAAN BETON
1 M3 ADUKAN BETON TUMBUK CAMPURAN 1PC : 2PS : 3KR
A TENAGA
Pekerja OH
Tukang Batu OH
Kepala Tukang OH
Mandor OH
B BAHAN
PC m3
pasir beton Kg
split 2/3 m3
C PERALATAN
D Jumlah (A+B+C)
1 M3 ADUKAN BETON K.175
A TENAGA
Pekerja OH
Tukang Batu OH
Kepala Tukang OH
Mandor OH
B BAHAN
PC m3
pasir beton Kg
Split 1/2 m3
C PERALATAN
D Jumlah (A+B+C)
1 M3 ADUKAN BETON K.225
A TENAGA
Pekerja OH
Tukang Batu OH
Kepala Tukang OH
Mandor OH
B BAHAN
PC m3
pasir beton Kg
Split 1/2 m3
C PERALATAN
D Jumlah (A+B+C)
PEMBESIAN DENGAN BESI POLOS
No Uraian
Satuan
A TENAGA
Pekerja OH
Tukang Besi OH
Kepala Tukang OH
Mandor OH
B BAHAN
Besi beton u24 polos kg
Kawat beton kg
C PERALATAN
D Jumlah (A+B+C)
1 M2 PASANG BEKISTING UNTUK SLOOF
No Uraian
Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Tukang kayu OH
Tukang besi OH
Kepala tukang OH
Mandor OH
B BAHAN
Kayu papan kelas III m3
Paku 5 cm – 12 cm kg
Minyak bekisting Liter
Besi beton polos kg
Kawat beton kg
Semen Portland kg
Pasir Beton m3
Kerikil m3
C PERALATAN
D Jumlah (A+B+C)
1 M2 PASANG BEKISTING UNTUK KOLOM
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Tukang kayu OH
Tukang besi OH
Kepala tukang OH
Mandor OH
B BAHAN
Kayu kelas III m3
Paku 5 cm – 12 cm kg
Minyak bekisting Liter
Besi beton polos kg
Kawat beton kg
Semen Portland kg
Pasir Beton m3
Kerikil m3
Kayu kelas II balok m3
Plywood 9 mm Lembar
Dolken kayu Ø (8-10) cm, panj 4 m Batang
C PERALATAN
D Jumlah (A+B+C)
ANALISA BIAYA KONSRUKSI PEKERJAAN PASANGAN
1 M2 PASANGAN BATA TEBAL 1/2 BATA 1 : 5
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
Bata Merah kelas I m3
PC kg
Pasir pasang kg
C PERALATAN
D Jumlah (A+B+C)
1 M2 PASANGAN BATA TEBAL 1/2 BATA 1 : 3
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
Bata Merah kelas I m3
PC kg
Pasir pasang kg
C PERALATAN
D Jumlah (A+B+C)
1 M2 PLESTERAN DINDING 1 : 3 TEBAL 15 MM
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
PC kg
Pasir pasang kg
C PERALATAN
D Jumlah (A+B+C)
1 M2 PLESTERAN DINDING 1 : 5 TEBAL 15 MM
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
PC kg
Pasir pasang kg
C PERALATAN
D Jumlah (A+B+C)
1 M2 PASANGAN LANTAI KERAMIK 20 X 20 CM
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
Keramik 20x20 m3
PC kg
Pasir pasang m3
Semen warna kg
C PERALATAN
D Jumlah (A+B+C)
1 M2 PASANGAN LANTAI KERAMIK 30 X 30 CM
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
Keramik 30x30 m3
PC kg
Pasir pasang m3
Semen warna kg
C PERALATAN
D Jumlah (A+B+C)
1 M2 PASANGAN LANTAI KERAMIK 20 X 25 CM
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
Keramik 20X25 M2
PC kg
Pasir pasang m3
Semen warna kg
C PERALATAN
D Jumlah (A+B+C)
ANALISA BIAYA KONSRUKSI PEKERJAAN KAYU
PASANGAN KUSEN PINTU DAN JENDELA
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang kayu OH
Kepala tukang OH
Mandor OH
B BAHAN
Kayu balok albasiah m3
Paku kg
Lem kayu kg
C PERALATAN
D Jumlah (A+B+C)
PASANGAN KUSEN PINTU PANIL
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang kayu OH
Kepala tukang OH
Mandor OH
B BAHAN
Kayu papan borneo m3
List kayu kamper profil ml
Lem kayu kg
C PERALATAN
D Jumlah (A+B+C)
1 M2 PASANGAN PINTU DAN JENDELA KACA
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang kayu OH
Kepala tukang OH
Mandor OH
B BAHAN
Kayu papan borneo m3
C PERALATAN
D Jumlah (A+B+C)
1 M2 PASANGAN DAUN DOUBLE TRIPLEK
No Uraian Satuan
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang kayu OH
Kepala tukang OH
Mandor OH
B BAHAN
Kayu papan borneo m3
Paku ml
Lem kayu kg
Triplek t = 4 mm lbr
C PERALATAN
D Jumlah (A+B+C)
1 M3 PASANGAN KUDA-KUDA
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang kayu OH
Kepala tukang OH
Mandor OH
B BAHAN
Kayu papan borneo m3
Besi strip ml
Paku kg
C PERALATAN
D Jumlah (A+B+C)
1 M2 PASANGAN RANGKA LANGIT-LANGIT
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang kayu OH
Kepala tukang OH
Mandor OH
B BAHAN
Kayu borneo 5/7 m3
Paku kg
C PERALATAN
D Jumlah (A+B+C)
1 M1 PASANGAN LIST PLAFOND
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang kayu OH
Kepala tukang OH
Mandor OH
B BAHAN
Kayu profil ml
Paku kg
C PERALATAN
D Jumlah (A+B+C)
ANALISA BIAYA KONSRUKSI PEKERJAAN PENUTUP ATAP
1 M1 PASANGAN ATAP GENTING PALENTONG
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang kayu OH
Kepala tukang OH
Mandor OH
B BAHAN
Genting palentong bh
C PERALATAN
D Jumlah (A+B+C)
1 M1 PASANGAN ATAP GENTING BUBUNG PALENTONG
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang kayu OH
Kepala tukang OH
Mandor OH
B BAHAN
Genteng bubung palentong bh
PC kg
Pasir pasang m3
C PERALATAN
D Jumlah (A+B+C)
ANALISA BIAYA KONSRUKSI PEKERJAAN LANGIT-LANGIT
1 M2 PASANGAN LANGIT LANGIT ASBES
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang kayu OH
Kepala tukang OH
Mandor OH
B BAHAN
Kayu borneo 5/7 m3
Asbes lbr
paku kg
C PERALATAN
D Jumlah (A+B+C)
ANALISA BIAYA KONSRUKSI PEKERJAAN ELEKTRIKAL
1 TTK PAS. TITIK LAMPU
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang OH
Kepala tukang OH
B BAHAN
Kabel NYA 3x2.5mm m'
inst. lampu dan stop kontak ttk
C PERALATAN
D Jumlah (A+B+C)
BOX MCB
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang cat OH
Kepala tukang OH
B BAHAN
Box Mcb lengkap unit
C PERALATAN
D Jumlah (A+B+C)
LAMPU PIJAR 25 WATT
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang cat OH
Kepala tukang OH
B BAHAN
Lampu sl 25 watt unit
C PERALATAN
D Jumlah (A+B+C)
PEMASANGAN 1 BH SAKLAR GANDA
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang cat OH
Kepala tukang OH
B BAHAN
Saklar ganda bh
C PERALATAN
D Jumlah (A+B+C)
PEMASANGAN 1 BH SAKLAR TUNGGAL
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang cat OH
Kepala tukang OH
B BAHAN
Saklar tunggal bh
C PERALATAN
D Jumlah (A+B+C)
PEMASANGAN 1 BH STOP KONTAK
Satuan
No Uraian
A TENAGA
Pekerja OH
Tukang cat OH
Kepala tukang OH
B BAHAN
Stop kontak m'
C PERALATAN
D Jumlah (A+B+C)
ANALISA BIAYA KONSRUKSI PEKERJAAN SANITASI
PEMASANGAN 1 BH KLOSET JONGKOK PORSELEN
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
Closet jongkok Unit
Semen Portland Kg
Pasir pasang M3
C PERALATAN
D Jumlah (A+B+C)
PEMASANGAN 1 M1 PIPA PVC AW DIAMETER 1/2
Satuan
No Uraian
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
Pipa PVC 1/2” M
Perlengkapan %
C PERALATAN
D Jumlah (A+B+C)
PEMASANGAN 1 M1 PIPA PVC AW DIAMETER 3/4
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
Pipa PVC 1/2” M
Perlengkapan %
C PERALATAN
D Jumlah (A+B+C)
PEMASANGAN 1 M1 PIPA PVC AW DIAMETER 2
No Uraian Satuan
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
Pipa PVC 2” M
Perlengkapan %
C PERALATAN
D Jumlah (A+B+C)
PEMASANGAN 1 M1 PIPA PVC AW DIAMETER 3
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
Pipa PVC 3” M
Perlengkapan %
C PERALATAN
D Jumlah (A+B+C)
PEMASANGAN 1 M1 PIPA PVC AW DIAMETER 4
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
Pipa PVC 4” M
Perlengkapan %
C PERALATAN
D Jumlah (A+B+C)
PEMASANGAN 1 BUAH KITCHENZINK
Satuan
No Uraian
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
Kitchenzink M
Warwe drain + accesoris (12%) %
C PERALATAN
D Jumlah (A+B+C)
PEMASANGAN 1 BH KERAN AI DIA 1/2" ATAU 3/4"
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
Kran air M
Seal tape
C PERALATAN
D Jumlah (A+B+C)
PEMASANGAN 1 BH FLOOR DRAIN
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
Floor drain Unit
C PERALATAN
D Jumlah (A+B+C)
ANALISA BIAYA KONSRUKSI PEKERJAAN PENGECATAN
2 1 M2 PENGECATAN TEMBOK BARU ACI INTERIOR 2X LAPIS CAT TERTUTUP
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
plamir Kg
ampelas lbr
cat dasar kg
cat penutup 2x kg
rol cat bh
C PERALATAN
D Jumlah (A+B+C)
3 1 M2 PENGECATAN TEMBOK BARU ACI EXTERIOR 2X LAPIS CAT TERTUTUP
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
plamir Kg
ampelas lbr
cat dasar kg
cat penutup 2x kg
rol cat bh
C PERALATAN
D Jumlah (A+B+C)
7 1 M2 PENGECATAN BIDANG PLAFOND BARU DENGAN SANLEX 2X LAPIS CAT TERT
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
plamir Kg
ampelas lbr
cat dasar kg
cat penutup 2x kg
rol cat bh
C PERALATAN
D Jumlah (A+B+C)
8 1 M2 PENGECATAN BIDANG PLAFOND VINLEX 2X LAPIS CAT TERTUTUP
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
plamir Kg
ampelas lbr
cat dasar kg
cat penutup 2x kg
rol cat bh
C PERALATAN
D Jumlah (A+B+C)
13 1 M2 PENGECATAN BIDANG PLAFOND VINLEX 3X LAPIS CAT TERTUTUP
No Uraian Satuan
A TENAGA
Pekerja OH
Tukang batu OH
Kepala tukang OH
Mandor OH
B BAHAN
cat meni kayu kg
plamir Kg
ampelas lbr
cat dasar kg
cat penutup 3x kg
C PERALATAN
D Jumlah (A+B+C)
ANALISA HARGA SATUAN PEKER
53,530.00
AH BIASA SEDALAM 1 M
59,895.00
ALI 1 M3 GALIAN TANAH
295,404.38
UKSI PEKERJAAN BETON
UK CAMPURAN 1PC : 2PS : 3KR
N BETON K.175
JUMLAH TENAGA KERJA
N BETON K.225
146,926.10
STING UNTUK SLOOF
4,209,414.09
KSI PEKERJAAN PASANGAN
TA TEBAL 1/2 BATA 1 : 5
585,052.50
TU DAN JENDELA KACA
398,779.50
AUN DOUBLE TRIPLEK
467,154.00
AN KUDA-KUDA
2,625,370.00
NGKA LANGIT-LANGIT
75,675.00
AN LIST PLAFOND
65,400.80
I PEKERJAAN PENUTUP ATAP
P GENTING PALENTONG
534,564.70
NTING BUBUNG PALENTONG
86,148.48
PEKERJAAN LANGIT-LANGIT
ANGIT LANGIT ASBES
1,133,218.20
SI PEKERJAAN ELEKTRIKAL
TITIK LAMPU
169,242.40
MCB
867,742.40
AR 25 WATT
92,742.40
BH SAKLAR GANDA
81,452.00
H SAKLAR TUNGGAL
74,452.00
BH STOP KONTAK
Koefisien Harga Satuan (Rp.)
Jumlah Harga (Rp.)
53,226.00
KSI PEKERJAAN SANITASI
OSET JONGKOK PORSELEN
392,168.16
PA PVC AW DIAMETER 1/2
Koefisien Harga Satuan (Rp.)
Jumlah Harga (Rp.)
300,503.40
PA PVC AW DIAMETER 3/4
300,472.24
PA PVC AW DIAMETER 2
323,027.40
PA PVC AW DIAMETER 3
87,117.20
PA PVC AW DIAMETER 4
136,477.63
BUAH KITCHENZINK
Koefisien Harga Satuan (Rp.)
Jumlah Harga (Rp.)
392,793.70
AN AI DIA 1/2" ATAU 3/4"
32,007.13
BH FLOOR DRAIN
42,007.00
SI PEKERJAAN PENGECATAN
ACI INTERIOR 2X LAPIS CAT TERTUTUP
14,443.54
ACI EXTERIOR 2X LAPIS CAT TERTUTUP
14,443.54
RU DENGAN SANLEX 2X LAPIS CAT TERTUTUP
55,311.40
OND VINLEX 2X LAPIS CAT TERTUTUP
55,311.40
OND VINLEX 3X LAPIS CAT TERTUTUP
70,008.40
ARGA SATUAN PEKERJAAN
0
BAHAN DAN ALAT
29,000
37,000
1,039,500
1,155,000
1,617,000
1,501,500
1,617,000
21,000
28,000
2,700
22,500
4,700
9,500
112,500
50,500
63,000
64,000
72,500
15,500
115,000
157,500
103,000
131,000
54,000
56,700
88,000
78,000
88,000
84,000
9,000
42,000
65,000
11,500
4,250
15,000
20,500
28,000
42,000
48,500
61,500
90,000
121,500
66,500
119,000
125,000
60,000
99,700
112,000
55,000
91,600
5,000
12,700
15,000
67,000
71,500
175,500
187,500
187,500
135,500
176,000
6,500
20,000
14,500
46,000
5,600
15,500
25,000
5,430
23,020
43,120
66,130
19,600
114,000
161,000
329,500
82,375
403,300
907,500
1,278,500
1,525,500
750,000
11,326
11,880
11,600
12,000
125,000
312,000
29,000
26,000
20,982
49,000
11,000
16,000
52,000
55,000
27,500
13,114
84,000
115,500
63,000
73,500
68,500
79,000
105,000
35,700
35,000
101,800
40,000
26,500
12,000
17,000
15,000
20,000
20,000
16,691
32,000
3,000
28,000
1,000
24,000
246,700
283,500
389,000
433,000
952,600
787,500
525,000
157,500
84,000
945,000
787,500
275,000
210,000
157,500
840,000
1,023,000
735,000
420,000
15,000
4,000
15,000
47,000
57,000
45,000
40,000
15,000
50,500
25,000
20,000
31,500
35,700
89,500
369,600
220,000
18,000
25,000
25,000
20,000
120,000
800,000
10,000
6,500
800,000
121,000
173,000
210,000
38,000
63,000
28,000
71,000
50,000
868,500
3,937,500
20,475,000
367,500,000
1,500,000
750,000
65,564
73,319
72,783
77,194
35,467
76,598
105,568
27,331
40,000
86,000
593,706
5,000
12,600
340,400,000
419,564.02
68,890.00
22,500.00
8,500.00
12,000.00
6,500.00
3,500.00
12,500.00
120,000.00
88,300.00
150,000.00
140,000.00
1,621.00
19,455.00
25,200.00
25,000.00
2,500.00
15,000.00
31,472.00
18,000.00
6,000.00
20,000.00
140,000.00
419,564.02
2,500,000.00
50,000.00
289,025.66
656,824.20
80,308.87
66,774.46
108,074.23
139,165.46
304,704.30
120,000.00
DAFTAR HARGA UPAH
1 2 3
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan Pemasangan Bouwplank 30.00
IV PEKERJAAN BETON
1 Pek. Sloof Beton 15/20, K - 225 0,93
2 Pek. Kolom Beton 15/15, K - 225 1
3 Pek. Ring Balk Beton 15/20, K - 225 0,93
V PEKERJAAN ATAP
1 Pek. Pasangan kuda-kuda 1.73
2 Pek. Pasangan plafond 37.50
3 Pek. Pasangan atap genting 7.00
VI PEKERJAAN DINDING
1 Pek. Pasangan Bata Merah ad. 1PC : 5PS 54.32
2 Pek. Pasangan Bata Merah ad. 1PC : 3PS 15.06
3 Pek. Plesteran 1:5 54.32
4 Pek. Acian 1:5 54.32
5 Pek. Plesteran 1:3 15.06
6 Pek. Acian 1:3 15.06
IX PEKERJAAN ELEKTRIKAL
1 Pek. Titik lampu 8.00
2 Pek. Box MCB 1.00
3 Pek. Saklar ganda 2.00
4 Pek. Saklar tunggal 2.00
5 Pek. Stop kontak 7.00
X PEKERJAAN SANITASI
1 Pek. Kloset jongkok porselen 1.00
2 Pek. Pipa PVC AW diameter 1/2" 28.45
3 Pek. Pipa PVC AW diameter 2" 15.50
4 Pek. Pipa PVC AW diameter 4" 8.30
5 Pek. Kitchenzink 1.00
6 Pek. Keran AI DIA 1/2' 2.00
7 Pek. Floor drain 1.00
XI PEKERJAAN PENGECATAN
1 Pek. Pengecatan tembok interior 2x lapis cat tertutup 80.24
2 Pek. Pengecatan tembok eksterior 2x lapis cat tertutup 56.29
3 Pek. Pengecatan plafond 35.00
JUMLAH
N BIAYA ( RAB )
HARGA JUMLAH
SAT. SATUAN HARGA
(Rp) (Rp)
4 5 6
M1 53,530.00 1,605,900.00
JUMLAH 1,605,900.00
M3 59,895.00 1,425,980.16
M3 30,771.04 280,662.66
M3 138,298.00 4,287,238.00
JUMLAH 5,993,880.82
M3 295,404.38 1,524,286.60
M3 698,079.96 6,031,410.85
JUMLAH 7,555,697.46
M3 4,321,517.29 4,019,011.08
M3 4,209,414.09 4,375,685.94
M3 4,321,517.29 4,019,011.08
JUMLAH 12,413,708.09
M3 2,625,370.00 4534013.99
M3 65,400.80 2,452,530.00
M3 534,564.70 3,741,952.90
JUMLAH 10,728,496.89
M2 49,000.00 2,661,582.00
M2 49,000.00 737,940.00
M2 24,469.76 1,329,148.68
M2 15,694.76 852,508.23
M2 31,098.94 468,350.08
M2 23,298.94 350,882.08
JUMLAH 6,400,411.09
M2 89,760.00 269,280.00
M2 89,760.00 3,006,960.00
M3 16,380.00 17,936.10
M2 22,476.31 820,385.45
JUMLAH 4,114,561.55
M2 5,325,740.00 697,671.94
M2 585,052.50 73,716.62
M2 585,052.50 35,103.15
M2 398,779.50 28,313.34
M2 398,779.50 21,534.09
JUMLAH 856,339.14
M2 14,443.54 1,158,891.88
M2 14,443.54 813,041.31
M2 55,311.40 1,935,899.00
JUMLAH 3,907,832.19
68,405,398.04
HARGA
NO NAMA PEKERJAAN SATUAN VOLUME SKETSA
A PEKERJAAN TANAH
DAN PNDASI
V=PxL
PEKERJAAN
1 M2 V = 9 x 14
PEMBERSIHAN LAHAN
V = 126 m2
k = 2P + 2L
PEKERJAAN K=(2x8)+(2x7)
2 PEMASANGAN M K = 16 + 14
BOUWPLANK K = 30 M
PEKERJAAN GALIAN
3 M3
TANAH PONDASI
PEKERJAAN URUGAN
4 M3
PASIR
PEKERJAAN PASANGAN
5 M3
AANSTAMPING
6 M3
P. Sloof = 31 m
L . Sloof = P X L
L . Sloof = 0,15 X 0,20
1 PEKERJAAN SLOOF M3 L. Sloof = 0,03
.
V = 31 X 0,03 = 0,93 M 3
V.urugan tanah kembali =
V.galian - ( V.pasir + V. Aanstam ping
PEKERJAAN URUGAN + V. Batu kali ) =
2 M3
TANAH KEMBALI 23,808 - ( 1,2555 + 5,332 + 8,098) =
23,808 - 14,686 =
9,121
L = P XL
L = 0,15 X 0,15
L = 0,0225
3 PEKERJAAN KOLOM M3 V = L X t X jumlah
V = 0,0225 X 3,3 X 14
V = 1,0395
L = P XL
L = 0,15 X 0,20
PEKERJAAN L = 0,03
4 M3
RINGBALOK V = L X P. penampang
V = 0,03 X 31
V = 0,93
C PEKERJAAN PASANGAN
DINDING 1/2 BATA
DINDING 1 : 3
& DINDING 1 : 5
*1:3
L = 0,3 X 3 = 0,9
1 DINDING A M 2
* 1: 5
L = 2,7 X 3 = 8,1
*1:3
L = 0,3 X 3 = 0,9
2 DINDING B M 2
* 1: 5
L = 2,7 X 3 = 8,1
*1:3
L = 0,3 X 3,5 = 1,05
3 DINDING C M 2
* 1: 5
L = 2,7 X 3,5 = 9,45
*1:3
L = 2 X 1,5 = 3
4 DINDING D M 2
* 1: 5
L = 1 X 1,5 = 1,5
*1:3
L=2X2=4
5 DINDING E M 2
* 1: 5
L=1X2=2
*1:3
L = 0,3 X 4 = 1,4
6 DINDING F M2 * 1: 5
L = 2,7 X 4 = 10,8
*1:3
L = 0,3 X 1,5 = 0,45
7 DINDING G M2 * 1: 5
L = 2,7 X 1,5 = 4,05
*1:3
L = 0,3 X 3 = 0,9
8 DINDING H M 2
* 1: 5
L = 2,7 X 3 = 8,1
*1:3
L = 0,3 X 3,5 = 1,05
9 DINDING I M 2
* 1: 5
L = 2,7 X 3,5 = 9,45
*1:3
L=2X3=6
10 DINDING J M 2
* 1: 5
L=1X3=3
*1:3
L = 0,3 X 1,5 = 0,45
11 DINDING K M 2
* 1: 5
L = 2,7 X 1,5 = 4,05
*1:3
L = 2 X 1,5 = 3
12 DINDING L M 2
* 1: 5
L = 1 X 1,5 = 1,5
jumlah dinding 1 : 3
V=A+B+C+D+E+F+G+H+I+
J+K+L
V = 0,9 + 0,9 + 1,05 + 3 + 4 + 1,2 +
0,45 + 0,9 + 1,05 + 6 + 0,45 + 3
JUMLAH = 18,9 M3
.
jumlah dinding 1 : 5
V = 8,1 + 8,1 + 9,45 + 1,5 + 2 +
10,8 + 4,05 + 8,1 + 9,45 + 3 + 4,05 +
1,5 V = 70,1 M3
PEKERJAAN
D MENGHITUNG LUAS
DINDING
1 DINDING 1 : 5
L. Dimding = 2 X 1 = 2
L.Bovenlight = 0,52 X 0,62 = 0,3224
DINDING E M2
L. Dinding - bukaan = 2 - 0,3224
= 1,6776
2 DINDING 1 : 3
L. Dinding = 1,5 X 2 = 3
DINDING L M2 L. Pintu = 0,9 X 2 = 1,8
L. Dinding - Bukaan = 3 - 1,8 = 1,2
E BUKAAN KUSEN
*1:3
L =PXL
= 0,3 X 0, 9 = 0,27
DINDING A M2 *1:5
L. pintu = 2,32 X 0,9 = 2,088
L. jendela = 1,88 X 1,38 = 2,594
= 2,088 + 2,594 = 4,682
*1:5
DINDING B M2 L. jendela = 1,88 X 1,44 = 2,707
*1:5
DINDING E M2 L. BV = 0,62 X 0,52= 0,322
*1:3
L =PXL
= 0,3 X 0, 9 = 0,27
DINDING F M2 *1:5
L. pintu = 2,32 X 0,9 = 2,088
L. jendela = 1,88 X 0,75 = 1,41 =
2,088 + 1,41 = 3,498
*1:3
L =PXL
DINDING J M2 = 2 X 0, 9 = 1,8
*1:5
L = 0,62 X 0,9 = 0,558
*1:3
L =PXL
DINDING L M2 = 2 X 0,75 = 1,5
*1:5
L= 0,62 X 0,75 = 0,465
Jumlah 1 : 3
= 0,27 + 0,27 + 1,5 + 1,8 = 3,84
Jumlah dinding - bukaan kusen
= 18,9 - 3,84 = 15,06
Jumlah 1 : 5
= 4,682 + 2,707 + 0,322 + 3,498 +
JUMLAH 0,465 + 0,558 = 12,232
Jumlah dinding - bukaan kusen
= 66,55 - 12,232 = 54,318
F PEKERJAAN KUSEN
P. Seluruh kusen
2,62 + 2,62 + 1,88 + 1,88 + 2,24 +
1 PINTU & JENDELA M3 2,04 + 1,36 = 14,54m
L. Penampang = 0,15 X 0,06 =
0,009 V = 14,54 X 0,009 = 0,131
P. Seluruh kusen
2,62 + 2,62 + 0,98 + 0,78 = 7m
2 PINTU 1 ( 2 buah ) M3 Jumlah 2 =
7 X 2 = 14
V = 14 X 0,009 = 0,126
P. Seluruh kusen
3 PINTU 2 M3 2,62 + 2,62 + 0,83 + 0,63 = 6,7m
V = 6,7 X 0,009 = 0,060
P. Seluruh kusen
1,88 + 1,88 + 1,46 + 1,26 + 1,46 =
4 JENDELA 1 M 3
7,94m
V = 7,94 X 0,009 = 0,071
P. Seluruh kusen
1,88 + 1,88 + 0,83 + 0,83 + 0,63 =
5 JENDELA 2 M3 6,05m
V = 6,05 X 0,009 = 0,054
P. Seluruh kusen
6 BOVEN LIGHT M3 0,62 + 0,62 + 0,60 + 0,60 = 2,44m
V = 2,44 X 0,009 = 0,021
G PEKERJAAN
PEMASANGAN KACA
*Jendela
PXL
1,42 X 0,65 = 0,923
* Fentilasi
L = 0,26 X 0,65 = 0,169
1 KUSEN A M2 = 0,169 + 0,923 = 1,092
Jumlah 2
1,092 X 2 = 2,184
* Fentilasi pintu
L = 0,26 X 0,80 = 0,208
Keseluruhan = 2,184 + 0,208 = 2,392
*Jendela
PXL
1,42 X 0,65 = 0,923
* Fentilasi
2 KUSEN B M2 L = 0,26 X 0,65 = 0,169
= 0,169 + 0,923 = 1,092
Jumlah 2
1,092 X 2 = 2,184
L = P XL
3 BOVEN LIGHT M2 L = 0,46 X 0,42 = 0,193
*Jendela
PXL
1,42 X 0,65 = 0,923
4 KUSEN F M2 * Fentilasi
L = 0,26 X 0,65 = 0,169
= 0,169 + 0,923 = 1,092
PEKERJAAN DAUN
H PINTU & JENDELA
PEKERJAAN LANTAI
I DAN PLAFON
PXL
1 RUANG TAMU M2 3X3=9
PXL
2 RUANG TIDUR M2 3 X 3,5 = 10,5
PXL
3 DAPUR M2 3 X 1,5 = 4,5
PXL
5 TERAS DEPAN M2 1,5 X 3 = 4,5
PXL
6 TERAS BELAKANG M2 6X1=6
PXL
2X2=4
2 Sisi = 4 X2 = 8
KERAMIK PADA PXL
7 DINDING KAMAR M2 1,5 X 2 = 3
MANDI 2 Sisi = 3 X 2 = 6
Dikurangi bukaan pintu
6 - 1,5 = 4,5
J PEKERJAAN PLESTERAN
PXL
3X3=9
1 DINDING A M 2
Dikurangi bukaan
9 - 4,682 = 4,318
PXL
3X3=9
2 DINDING B M 2
Dikurangi bukaan
9 - 2,707 = 6,293
PXL
3 DINDING C M2 3 X 3,5 = 10,5
PXL
4 DINDING D M2 3 X 1,5 = 4,5
PXL
5 DINDING E M2 3X2=6
PXL
3 X 4 = 12
6 DINDING F M 2
Dikurangi bukaan
12 - 1,41 = 10,59
PXL
7 DINDING G M2 3 X 1,5 = 4,5
PXL
8 DINDING H M2 3X3=9
PXL
9 DINDING I M2 3 X 3,5 = 10,5
PXL
10 DINDING J 3X3=9
M 2
Dikurangi bukaan
9 - 6,558 = 2,442
PXL
11 DINDING K M2 3X2=6
PEKERJAAN RANGKA
K KUDA - KUDA
L. Penampang = P X L
0,08 X 0,12 = 0,0096 M2 V=
1 BALOK TARIK 8/12 M3 0,0096 X 5 = 0,048
Jumlah = 3
3 X 0, 048 = 0,144
L. Penampang = P X L
0,06 X 0,12 = 0,0072 M2 V=
2 BALOK GAPIT 6/12 M3 0,0072 X 3,12 = 0,022
Jumlah = 3
3 X 0, 022 = 0,066
L. Penampang = P X L
0,08 X 0,12 = 0,0096 M2 V=
BALOK KAKI KUDA -
3 M3 0,0096 X 2,83 = 0,027
KUDA Jumlah = 6
6 X 0, 027 = 0,162
L. Penampang = P X L
0,08 X 0,12 = 0,0096 M2 V=
4 BALOK MAKELAR M3 0,0096 X 1,62 = 0,01584
Jumlah = 3
3 X 0, 01584 = 0,04752
L. Penampang = P X L
0,08 X 0,12 = 0,0096 M2 V=
5 BALOK NOK M 3
0,0096 X 8 = 0,0768
L. Penampang = P X L
0,08 X 0,12 = 0,0096 M2 V=
6 GORDING M3 0,0096 X 8 = 0,0768
Jumlah = 2
3 X 0, 0768 = 0,1536
L. Penampang = P X L
0,08 X 0,12 = 0,0096 M2 V=
7 MURPLAT M3 0,0096 X 8 = 0,0768
Jumlah = 2
2 X 0, 048 = 0,1536
L. Penampang = P X L
0,05 X 0,07 = 0,0035 M2 V=
8 KASO - KASO M3 0,0035 X 4,36 = 0,01526
Jumlah = 42
42 X 0, 01526 = 0,64092
L. Penampang = P X L
0,08 X 0,12 = 0,0096 M2 V=
9 BALOK SOKONG M3 0,0096 X 1,24 = 0,011
Jumlah = 6
6 X 0, 011 = 0,066
L. Penampang = P X L
10 PAPAN RUITER M3 0,02 X 0,20 = 0,004 M2 V=
0,004 X 8 = 0,032
L. Penampang = P X L
0,02 X 0,03 = 0,0006 M2 V=
11 RENG M3 0,0006 X 8 = 0,0048
Jumlah = 28
28 X 0, 0048 = 0,1344
L. Penampang = P X L
0,02 X 0,20 = 0,004 M2 V=
12 LISPLANK M3 0,004 X 8 = 0,032
Jumlah = 2
2 X 0,032 = 0,064
L PENUTUP ATAP
PXL
8 X 4,36 = 34,88
1 GENTENG M 2
2 Sisi penutup atap
34,88 X 2 = 69,76