RAB ILS Tahun 2016
RAB ILS Tahun 2016
I. PENGADAAN PERALATAN
1 Dual ILS Transmitter 1 set 1 set
2 Dual DME Transmitter 1 set 1 set
3 Dual Control Monitoring Sytem (RCMS) 1 set 1 set
4 Portable ILS Receiver (PIR) 1 set 1 set
5 Middle Marker (MM) 1 set 1 set
6 Antenna Simulator dan Detector 1 set 1 set
7 Monitor Distribusi 1 set 1 set
8 Antenna Distribusi 1 set 1 set
Terbilang : (Tiga Belas Milyar Empat Ratus Sembilan Puluh Tujuh Juta Rupiah)
XXXXXX
Pembina
XXXXXX
53
53
CIAN ANGGARAN BIAYA (RAB)
Output STANDAR BIAYA
TAHUN ANGGARAN 2016
BIAYA
JUMLAH
SATUAN
2,600,000,000 2,600,000,000
1,980,000,000 1,980,000,000
420,000,000 420,000,000
430,000,000 430,000,000
210,000,000 210,000,000
160,000,000 160,000,000
170,000,000 170,000,000
190,000,000 190,000,000
20,000,000 60,000,000
70,000,000 70,000,000
140,000,000 140,000,000
6,000,000 12,000,000
4,000,000 8,000,000
5,000,000 40,000,000
25,000,000 25,000,000
45,000,000 45,000,000
260,000,000 260,000,000
460,000,000 3,220,000,000
370,000,000 1,850,000,000
50,000,000 100,000,000
30,000,000 210,000,000
35,000,000 70,000,000
XXXXXXXXXX
Pembina (IV/a)
XXXXXXXXXX
53